CC Packet 2007 12 10AGENDA
CHANHASSEN CITY COUNCIL
MONDAY, DECEMBER 10, 2007
CHANHASSEN MUNICIPAL BUILDING, 7700 MARKET BOULEVARD
5:30 P.M. - CITY COUNCIL WORK SESSION, FOUNTAIN CONFERENCE ROOM
Note: If the City Council does not complete the work session items in the time allotted, the
remaining items will be considered after the regular agenda.
A. EXECUTIVE SESSION: City Manager’s Performance Evaluation (no enclosures).
B. Item Deleted (Public Works Facility Update).
C. 2008 Street Reconstruction Project No. 08-01: Update on Feasibility Study & Citizen
Comments.
D. Establish Guidelines/Benchmarks for Staffing Levels in all Departments.
7:00 P.M. – REGULAR MEETING, CITY COUNCIL CHAMBERS
CALL TO ORDER (Pledge of Allegiance)
PUBLIC ANNOUNCEMENTS
E. Presentation of 2007 Environmental Excellence Awards.
CONSENT AGENDA
All items listed under the Consent Agenda are considered to be routine by the city council and
will be considered as one motion. There will be no separate discussion of these items. If
discussion is desired, that item will be removed from the Consent Agenda and considered
separately. City council action is based on the staff recommendation for each item. Refer to the
council packet for each staff report.
1. a. Approval of Minutes:
- City Council Work Session Minutes dated November 26, 2007
- City Council Summary Minutes dated November 26, 2007
- City Council Verbatim Minutes dated November 26, 2007
- City Council Work Session Minutes dated December 3, 2007
- Truth-In-Taxation Hearing Minutes dated December 3, 2007
Receive Commission Minutes:
- Planning Commission Summary Minutes dated November 20, 2007
- Planning Commission Verbatim Minutes dated November 20, 2007
1
b. 2008 Street Reconstruction Project 08-01, Laredo Drive: Approve Feasibility
Study and Call for Public Hearing.
c. Lyman Boulevard Project 06-03: Approval of Agreement.
d. Wells 12 & 13, Project Nos. 08-04 & 08-05: Approve Plans & Specifications;
Authorize Advertising for Bids.
e. Frontier 2nd Addition, Project No. 04-16: Accept Pond Improvements.
f. Approval of 2008 Police Contract.
g. Approve Resolution Authorizing Early Retirement of 1998C GO Water Revenue
Bonds, 1999 A GO Bonds, and 2001B GO Improvement Bonds.
h. Approval of City Code Amendment to Chapter 20 re: Interim Use Permits for
Antennas on Rooftops over 15 ft. in Height.
i. Rosemount, 8200 Market Boulevard: Approval of Interim Use Permit to Allow a
Temporary Antenna on top of their Building.
j. Approval of Temporary On-Sale Liquor License, St. Hubert Catholic Community,
January 4, 2008.
k. School Well Improvements (New Well No. 14): Award Consultant Contract to
Barr Engineering Company for Design Services
VISITOR PRESENTATIONS
PUBLIC HEARINGS - None
UNFINISHED BUSINESS - None
NEW BUSINESS
2. Consider Adoption of the 2008 Budget & Levy and the 2008-2012 Capital Improvement
Program.
3. Approval of City Code Amendment to Chapter 4 re: Fees.
COUNCIL PRESENTATIONS
4. Announce the Results of the City Manager’s Performance Evaluation, Mayor Furlong
(verbal).
ADMINISTRATIVE PRESENTATIONS
2
CORRESPONDENCE PACKET
ADJOURNMENT
A copy of the staff report and supporting documentation being sent to the city council will be
available after 2:00 p.m. on Thursday. Please contact city hall at 952-227-1100 to verify that
your item has not been deleted from the agenda any time after 2:00 p.m. on Thursday.
GUIDELINES FOR VISITOR PRESENTATIONS
Welcome to the Chanhassen City Council Meeting. In the interest of open communications, the Chanhassen City
Council wishes to provide an opportunity for the public to address the City Council. That opportunity is provided at
every regular City Council meeting during Visitor Presentations.
1. Anyone indicating a desire to speak during Visitor Presentations will be acknowledged by the Mayor.
When called upon to speak, state your name, address, and topic. All remarks shall be addressed to the City
Council as a whole, not to any specific member(s) or to any person who is not a member of the City
Council.
2. If there are a number of individuals present to speak on the same topic, please designate a spokesperson
that can summarize the issue.
3. Limit your comments to five minutes. Additional time may be granted at the discretion of the Mayor. If
you have written comments, provide a copy to the Council.
4. During Visitor Presentations, the Council and staff listen to comments and will not engage in discussion.
Council members or the City Manager may ask questions of you in order to gain a thorough understanding
of your concern, suggestion or request.
5. Please be aware that disrespectful comments or comments of a personal nature, directed at an individual
either by name or inference, will not be allowed. Personnel concerns should be directed to the City
Manager.
Members of the City Council and some staff members may gather at Houlihan’s Restaurant & Bar, 530 Pond Promenade in Chanhassen
immediately after the meeting for a purely social event. All members of the public are welcome.
3
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
e
Ml
MEMORANDUM
Paul Oehme Director of Public Warks City Engineer f OJ
TO
FROM Alyson Fauske Assistant City Engineer o
DATE December 10 2007
SUBJECT 2008 Street Reconstruction Project No 08 01 Update on
Feasibility Study Citizen Comments
BACKGROUND
On September 24 2007 City Council awarded the consultant contract to Kimley
Horn and Associates and authorized the preparation of a feasibility report
A neighborhood meeting was held on November 14 2007 Eighty six 86
notices were sent out far the meeting Approximately 40 residents attended the
meeting
DISCUSSION
The City s pavement management program recommends that streets in the Laredo
Drive area be reconstructed in 2008 City Staff receives more complaints about
the condition of Laredo Drive from residents and the traveling public then any
other street in the system The public utilities in the area are old have had many
problems and should be replaced or repaired Approximately 1 35 miles of streets
are proposed to be reconstructed The area for improvements include Laredo
Drive Laredo Lane Longview Circle Cimarron Circle and Highland Drive west
of Laredo Drive
The streets are proposed to be reconstructed approximately the same vvtclthBs the
existing streets 28 wide Laredo Drive betweenWest78thStreetandFrpltier
Trail is proposed to be built to a 31 foot wide urban streeFsection The
reconstruction project will include the improvement or replacement ofmOSt
public utilities within the reconstruction project area A map of the 2008 Street
Reconstruction Project Area is attached More detail about the project is available
in the Council background for acceptance of the feasibility study
QUESTIONS CONCERNS RAISED AT THE NEIGHBORHOOD
MEETING
Staff received many questions and comments regarding the project from property
owners at the neighborhood l1e e ti llg 9 ofthe questions were answered at the
meeting Other specific property questions were answered with individual
property owners at a later date
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play4
Paul Oehme
2008 Street Improvement Project WS Update
December 10 2007
Page 2
Below are most of the questions and comments that were received
Pavement Condition
Why has the street been allowed to deteriorate to this condition
The quality of the current road is an issue Is the City obligated to award
the contractto the lowest bidder How do we know the lowest bidder will
construct a quality street
Why doesn t the City restrict the number of waste haulers These trucks
wreck the street
Street design
It is dangerous to take a left turn off of Laredo Lane on to Laredo Drive
Will this be fixed
Will the road width change
What percentage of streets are rural sections i e no curb and gutter
What if we do not want curb and gutter If we re paying 40 of the street
cost we should be able to vote on whether curb and gutter is installed
Instead of installing curb and gutter why can t rain gardens be installed
How much of our yard will be impacted by adding curb and gutter
Assessments
No one will argue that Laredo Drive needs to be improved but we re all
shell shocked with the price
Why doesn t the City pay 100 of the project cost In the past the City
didn t assess for street projects
What is the assessment methodology
Do surrounding communities assess for street improvements
Why aren t assessments based on traffic volumes
Would my assessment decrease if Laredo Drive between West 78th Street
and Frontier Trail wasn t included in the project
How many residential properties are being assessed
When will we know the exact amount of the assessment
My property taxes just increased by 1 000 00 last year I may not be able
to afford the proposed assessment
I am a senior citizen on a fixed income and may not be able to afford the
assessment
If our property values increase as a result of the project our property taxes
will also increase
Are assessments tax deductible
Does the City make any money on the 6 interest that is charge with the
assessment
Utilities
How far back from the curb will the sanitary sewer be replaced if there is a
problem
G ENGIPUBLIC 2008 Projects 08 01 2008 Street lmprovements12 1O 07 worksession doc5
Paul Oehme
2008 Street Improvement Project WS Update
December 10 2007
Page 3
Will small utilities have a chance to upgrade their infrastructure
Will the overhead utility lines be buried
Are street lights included in the project
Miscellaneous
Will a sidewalk be installed on Laredo Drive north of Frontier Trail
Will traffic count data be presented at the public hearing
Will we have to take down our mailboxes
Will driveways be replaced
Will trees and landscaping be replaced
What happens if my boulevard tree dies as a result of the project
How will the street project affect the groundwater levels
What happens to my in ground sprinkler system
I want a guarantee in writing from the City that the City will pay to
replace my underground sprinkler system that is within the public right of
way
How would the project affect the 4th of July parade route
Staff will give a brief update to the council on the project at the work session and
briefly address the questions listed above
Attachment
c Chadd Larson Kimley Hom
Kim Benson Kimley Hom
G ENGIPUBLICI 2008 Projectsl08 01 2008 Street Improvementsll2 1O 07 worksession doc6
l OneSIOlga
tQ
c
Q r
1
9 I
I
Oar 4
q
0
0 5
31
r
00 00
45
13
12 11 10
47 40
ra114 16 17 1
1 35 34 33A 18 19 20 21 23
J 1
I 51 36
12 8 59 32 31 30 29 28 27 26125
24
57 b
ChippewaCI u 56
T
60 V
V M 5 61 Del Rio Drive
c 2 r
55 62
lr r 73r 63
r 0L 74 1r 64
T I a
unve 65
ra Drive 66In75
68
0
61s
Del Ia Fe
9
j
5t Village Road
m
2
I
7 6
9 81
L
Highland Drive
o
r 7 l
WD btc j
2 rffil 1Trail
I
w 76th 5t
76 86 a
0
C
o
085 c
a
J
m
84
77
83
82
81
OJ J
80
c
l 1
I II
LChanView
78
79
W 78th 51 W 78th 5t
J f I I JI I T I I T I I I
N 2008 Street Project
300 150 0
1
300
I Feet
November 5 2007
g eng public 08 01 2008 Street Improvements MapslAssessment Map mxd
7
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952227 1404
Planning
Natural Resources
Phone 952227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
b
TO Todd Gerhardt City Manager
Laurie Hokkanen Assistant City Manager JetFROM
DATE December 10 2007 oW
RE Future Staffing Levels
SUMMARY
During the 2007 Visioning session staff and the City Council expressed a
need to examine our future staffing needs Earlier this year we worked with
Sheriff Bud Olson and his staff to devise a 3 year staffing plan This staff
report includes those projections as well as discussion regarding future needs
over the next five years in other City departments
Future StaffinCl Needs
I I
Timeline
Department 13 years 1 5 years 5 10 years 10 15 year
Bulldinq 1
Park Ree 1 2012
Streets 0 5 1 1
Utilities 15 1 1
Finance 0 0
Public Safetv 2
Fleet DeDI 0 5 1
T
DISCUSSION
Administration and Finance
No additional staff are projected over the next five years
Community Development
The Community Development Department is comprised of the Planning and
Building divisions No new staff are projected in the next five years in the
Planning Division The Building Division currently has five inspectors and
one Building Official Historically this Division was staffed by six
inspectors however one position has been vacant for approximately two
years
From January to November 2007 the Building Department has issued 2 765
building not including zoning permits and performed 9 601 inspections
The City ot Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play8
The Building Division continues to improve utilization of technology changes such as
paperless inspections and electronic field scheduling which help make the existing staff
more efficient The need for 1 one additional inspector is projected in the next five years
The City is mandated by the State to review permits The need for a new inspector will be
monitored using factors such as overtime number of permits submitted and wait time for
inspections as benchmarks The timing of new residential officelindustrial and commercial
projects will largely drive the need for additional staff
Parks Recreation
The Parks Recreation Department is comprised of two divisions Park Rec Admin and
Parks Maintenance No new staff are projected in the Admin Department over the next five
years The Maintenance department is comprised of the Park Superintendent and six staff
The City has and will continue to experience significant growth in the size and complexity of
our park open space and trail systems We now have over 800 acres of parks and open space
and 80 miles of trails The last time new full time staff was added was in 1998 The Parks
department augments their ability to provide services through the use of seasonal employees
during high demand seasons Typically there are 12 15 seasonal employees over the
summer months in the Parks department In addition to seasonal employees some work is
out sourced especially in the area of weed control
However there is a need to readjust the balance between full time and part time labor Full
time employees are needed to effectively guide the work of seasonal crews
Additionally as the Parks Maintenance department has assumed additional duties with the
growth of the Parks system there has been an overall decrease in the level of maintenance of
our public outdoor spaces The Parks Department foresees the need to add 1 one additional
full time park laborer light equipment operator to maintain service levels and effectiveness
This position will likely be requested in the 2012 budget to correspond with the build out of
many of the 2005 MUSA improvements in addition to the start up of improvements in the
2010 MUSA
Public Works
The Public Works Department includes Engineering Streets Utilities and Fleet
Maintenance The Public Works Department is experiencing increased demand on current
personnel as the community grows and the amount of infrastructure increases
Pressures on the Public Works department include the increased number of roads that must
be maintained and plowed in the winter the new and existing lift stations and other utility
infrastructure
The City must also comply with numerous regional state and federal mandates particularly
in regard to MS4 PCA storm water permits which require the City to inspect and maintain
our storm system to a high standard Other mandates include increased testing requirements
for potable water as directed by the federal government We are experiencing increased
utility locate requirements for the one call mandate The Utility departments gets nearly
9
5 000 requests for locates per year We are also subject to NPDES inspection cleaning
and reporting requirements for storm water system and 1 1 abatement program by MeES
We are currently able to maintain current street condition but are not making improvements
We are using bigger more efficient equipment to get the job done however bodies are still
needed in the field doing the work Staff level changes are necessary to maintain existing
service levels in the future and meet mandates by other governing agencies
10
Staffing Levels Needs
Public Works
Utility
CenterlineMilesNoUtilityNoStreetNoUtilityEmployeesPerMilesofStreetMilesStreetPerMilesStreetPerConnectionsPer
City Population ofStreetConnectionEmployeesEmployees1000PopulationPerEmployeeStreetEmployeeUtilityEmployeeUtilityEmployee
Brooklyn Center 29 0001079000960527131191781500
Columbia Heiahts 19 0006660006807447111083750
Crystal 23 000908700860616431131501450
Fridley 27 0001108250910070579122110825
Golden Valley 20 000120730098085706133150913
Hopkins 18 00011286078800140187
New Hope 21 00064560046048640160107933
Oakdale 27 50012068051857200150
Prior Lake 21 000101750058062777202126938
Shoreview 26 000908400780586001291131050
Savage 24 000115nfa109079605115128nfa
White Bear Lake 25 000858000580526541701061000
West St Paul 19 50060nfa7405654586150nfa
Chaska 22 50090610089076529113100678
Averages 23 036957485770646511361311004
Chanhassen 23 000103700088070644129129875
Roseville 34 000124101001090566531241381122
St Louis Park 44 000130140001412059500931081167
Minnetonka 51 5002551800022150726891161701200
Eden Prairie 61 0002251714051726132161
Averages 38 100131305964211614497
Year 2020
Chanhassen 38 000130150001011055619130118
Street Department Needs
Short term Needs Add 1 more summertempemployee35years
Add additional tempemployeesasneeded
Long term Needs Add 1 full time employee510years
Add 1 Full time employee1015years
Utility Department Needs
Add 1 more summertempemployee25years
Add additional tempemployeesasneeded
Long term Needs Add 1 Full time employee13years
Add 1 full time employee310years
Add 1 full time employee1015years
Fleet Department Needs
Add 1 summer tempemployee38years
Long term Needs Add 1 full time employee815years11
RECCOMMENDA TION
No action is required by the City Council This information is for planning purposes and all
requests to add staff would be included in budget discussions as the need arises
12
E
2007 Environmental Excellence Awards o
The Environmental Excellence Awards are presented by the City of Chanhassen to
recognize environmental improvements and stewardship throughout the community
These awards are designed not only to recognize achievement but also to
communicate new ideas and encourage the members of the Chanhassen community to
make a difference in their world
Dale Rusch
Project Annual monitoring of blue bird nest boxes in Lake Ann Park around his home
and along Coulter Blvd
If not for the behind the scenes efforts by volunteers in this community our natural
environment would look much different From the nameless people who pick up trash
on their daily walks to someone like Dale Rusch who voluntarily takes on the annual
bluebird nest box monitoring program in city parks and at his home these people make
a difference Dale monitored 11 nest boxes through the season and watched as 37
bluebird fledglings emerged as well as 11 tree swallow babies and 6 chickadees He
counted eggs in each nest recorded the species that nested and kept track of the
hatchings Thanks to Dale Chanhassen residents are able to catch a glimpse of
stunning blue in the air in our city parks
Eckankar
Receiving Peter Skelskey and Jack Heyl
Project Ongoing natural resources stewardship
Passing Eckankar s property along Powers Boulevard and West 78th Street is a relaxing
experience as you gaze off over the rolling prairie and back to the Big Woods forests
Creating this environment is an ongoing project and one that requires tenacity and
commitment Eckankar currently manages many acres of native prairie along with a
large area of sugar maple basswood and oak forest The Building and Grounds staff
have consistently addressed invasive species tree diseases prairie burns and
woodland maintenance for many years Managing these areas appropriately requires a
substantial investment of time and money but the payoff is a site of beauty and
inspiration for the Chanhassen community
General Mills
Receiving Neida Cardona and General Mills employees
Project Volunteering to plant the Lake Ann rain gardens
On a bright Saturday morning in May nearly 70 volunteers showed up at Lake Ann Park
to get a little dirty These General Mills employees and their families were celebrating
Earth Day in a significant way they were going to plant hundreds of grasses sedges
shrubs trees and flowers in the newly constructed Lake Ann rain gardens The
volunteers spent the morning digging holes planting native species and mulching the
gardens In the end the three gardens were functional and eye catching and will help
improve water quality in one the city s signature parks
G planljs EC EE Award Projects EEaward presentation 07
13
CHANHASSEN CITY COUNCIL
WORK SESSION
NOVEMBER 26, 2007
Mayor Furlong called the work session to order at 5:35 p.m..
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Litsey, Councilwoman
Ernst, Councilwoman Tjornhom, and Councilman Peterson
STAFF PRESENT: Todd Gerhardt, Kate Aanenson, Greg Sticha, Paul Oehme, and Todd
Hoffman
CONTINUATION OF 2008 BUDGET DISCUSSIONS:
FIRE DEPARTMENT PRESENTATION.
Chief Greg Geske gave a power point presentation outlining the fire department's proposed
operating budget for 2008, which includes a .3% increase from 2007. He explained how priority
dispatching has helped to decrease the number of calls handled by the fire department this year
compared to previous years before priority dispatch was used. Councilman Litsey asked how
members of the department like the priority dispatch system. Mayor Furlong asked about the
hiring of new recruits for 2008. Chief Greg Geske explained that the fire department is looking
to begin building membership numbers up, anticipating the completion of the new satellite
station and replacing expected retirements.
2008-2012 CAPITAL IMPROVEMENT PROGRAM.
Todd Gerhardt reviewed the list of purchases proposed to be made in the next 5 years. Greg
Sticha explained what the 5 year program includes and how items plan to be funded. He
reviewed specifically the changes for 2008 pertaining to the capital replacement funds, the
satellite fire station #3 and equipment needed to outfit the building, and Lyman Boulevard
improvements. Councilman Litsey asked how assessments were figured for the Lyman
Boulevard improvements. Mayor Furlong asked for clarification on MSA roads and funding.
Greg Sticha continued discussing the west water treatment plant, annual street improvement
projects and public works facility, whether it will entail remodeling existing city buildings or
building a new structure. Councilwoman Tjornhom asked why the existing city building would
need to share space. Todd Gerhardt explained the need for an emergency generator for city hall
which will be used as the command center during emergencies. Mayor Furlong noted that the
City Manager and himself have been discussing the use of alternative fuels, and asked if there
were enough stand-by generators for the number of wells in the city. Councilwoman Ernst
questioned the size of the generator being requested for City Hall. Councilman Litsey expressed
a concern that noise needs to be addressed with a generator. Councilman Peterson asked for
clarification of the $300,000 proposed for building improvements in 2009. Greg Sticha
explained that the Truth in Taxation hearing will be held on December 10th and reviewed the
updated numbers in the 2008 levy amounts and their affect on taxpayers. There was some
confusion over the numbers with the health insurance, which Mr. Sticha stated he would research
14
City Council Work Session - November 26, 2007
2
and clarify at the next work session meeting. Mayor Furlong questioned what still needed to be
done to get closer to Scenario #3's numbers.
Mayor Furlong recessed the work session at 7:05 p.m.. The work session was reconvened
at 7:40 p.m..
DISCUSSION OF PROCESS FOR CITY MANAGER'S PERFORMANCE
EVALUATION.
The council discussed the process to be followed for the city manager's performance evaluation.
The work session was adjourned.
Submitted by Todd Gerhardt
City Manager
Prepared by Nann Opheim
15
CHANHASSEN CITY COUNCIL
REGULAR MEETING
SUMMARY MINUTES
NOVEMBER 26, 2007
Mayor Furlong called the meeting to order at 7:10 p.m..
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Litsey, Councilwoman
Ernst, Councilwoman Tjornhom, and Councilman Peterson
STAFF PRESENT: Todd Gerhardt, Roger Knutson, Kate Aanenson, Paul Oehme, and Todd
Hoffman
PUBLIC PRESENT FOR ALL ITEMS:
Laura Wondra 9590 Foxford Road
Kristine Kubisiak 1461 Heron Drive
Erin Schliesman 843 Ramsey Avenue, Carver
Madison Miller 8500 Allegheny Circle
Janet Paulsen 7305 Laredo Drive
Deb Lloyd 7302 Laredo Drive
Nick & Sarah Wierzbinski 7511 Canyon Curve
PUBLIC ANNOUNCEMENTS: Mayor Furlong invited all residents to the Tree Lighting
Ceremony being held on Saturday, December 1st at City Center Park in the Plaza from 5:00 to
6:00 p.m., as well as making people aware that the Chanhassen Lions Club is conducting it's
Christmas tree lot over by Cub Foods and on Sunday, December 2nd from 8:00 a.m. to 1:00 p.m.
the City of Chanhassen, along with the Chanhassen Rotary Club is sponsoring their annual
Breakfast with Santa.
CONSENT AGENDA:
Debbie Lloyd requested that item 1(e) be pulled to hear the vote on that item.
Councilman Litsey moved, Councilwoman Ernst seconded to approve the following consent
agenda items pursuant to the City Manager's recommendations:
a. Approval of Minutes:
-City Council Work Session Minutes dated November 13, 2007
-City Council Verbatim and Summary Minutes dated November 13, 2007
Receive Commission Minutes:
-Planning Commission Verbatim and Summary Minutes dated November 6, 2007
b. Resolution #2007-71: Stonefield Project 06-07: Approve Street and Utility
Improvements.
16
City Council Summary - November 26, 2007
c. Approve Master Contract with Barr Engineering Company for Consulting Services,
PW009B.
d. Approve Nominations for 2007 Environmental Excellence Awards.
f. Resolution #2007-72: Approval of Resolution for Advancement of State Aid Funds for
Lyman Boulevard Improvement Project 06-03.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
1(e). LAKESIDE DEVELOPMENT, NORTHWEST CORNER OF LYMAN
BOULEVARD AND LAKEVIEW ROAD EAST, APPLICANT: SIENNA
CORPORATION: APPROVAL OF MINOR PUD AMENDMENT TO ADJUST
INTERNAL SERBACK REQUIREMENTS FROM 20 FEET TO 15 FEET AND
ADJUST THE WETLAND SETBACK CONSISTENT WITH CURRENT
WETLAND SETBACK REQUIREMENTS.
Councilman Litsey moved, Councilwoman Ernst seconded to approve the Minor PUD
amendment to adjust internal setback requirements from 20 feet to 15 feet and adjust the
wetland setback consistent with current wetland setback requirements for Lakeside
Development at the northwest corner of Lyman Boulevard and Lakeview Road East,
applicant, Sienna Corporation. All voted in favor and the motion carried unanimously
with a vote of 5 to 0.
VISITOR PRESENTATIONS: Debbie Lloyd asked questions regarding the Lakeside
development's conditions of approval and changes to the wetland setback ordinance.
LAW ENFORCEMENT/FIRE DEPARTMENT UPDATE. Sgt. Peter Anderley stated he
was available to answer any questions regarding the Sheriff's Office report and statistics for the
month of October. He reminded the council, as well as residents, about winter parking
requirements that are in effect from November 1st to April 1st, ice safety on area lakes, and safe
winter driving tips, along with a reminder that there are still thefts from vehicles occurring in the
city. Because of scheduling conflicts, there was no one present from the fire department, but
Mayor Furlong noted the council met with Chief Greg Geske at the work session.
T-MOBILE: REQUEST FOR CONDITIONAL USE PERMIT AND SITE PLAN
REVIEW AMENDMENTS TO ALLOW A 145 FOOT TELECOMMUNIATIONS
TOWER WITH A 4 FOOT LIGHTNING ROD AND A 6 FOOT PRIVACY FENCE;
LOCATED WEST OF GREAT PLAINS BOULEVARD, NORTH OF CREEKWOOD
DRIVE, SOUTH OF HALLA NURSERY, AND EAST OF BLUFF CREEK GOLF
COURSE (OUTLOT A, HALLA MARYANNE ADDITION). APPLICANT: T-MOBILE
USA.
2
17
City Council Summary - November 26, 2007
Kate Aanenson presented the staff report and Planning Commission update for this item.
Councilwoman Tjornhom asked about views from neighboring properties. Mayor Furlong asked
about adding a condition to the Conditional Use Permit that the tower be removed if abandoned.
Councilman Litsey moved, Councilman Peterson seconded that the City Council approves
the Amendment to the Site Plan Review #07-04 for a 149-foot telecommunication tower and
a 6-foot cedar fence as shown on the site plan received October 5, 2007, subject to the
following conditions:
1. The applicant shall enter into a site plan agreement and submit financial security to guarantee
the improvements.
2. Clearing for the tower and equipment pad shall be no greater than 15 feet from the edge of
the pad.
3. A maximum of 25 feet is allowed for clearing the access road to the site. Trees shall be
preserved to the greatest extent possible.
4. The applicant shall install a minimum of eight Black Hills spruce around the equipment
platform. Trees shall be at least six feet in height.
5. Site grading and vegetation removal shall be minimized to the greatest extent practical. If
any excess material is anticipated to be generated as a result of access road construction, the
disposal location must be approved in writing by City staff prior to road construction.
6. A rock construction entrance complying with the City’s standard detail (#5301) shall be
included on the Erosion and Grading Plan and shall be constructed prior to the remainder of
the gravel road.
7. If applicable, the applicant shall apply for and obtain permits from the appropriate regulatory
agencies (e.g., Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control
Agency) and comply with their conditions of approval. (Watershed district and MPCA permits
are necessary if the total disturbed area is in excess of 1.0 acres).
8. The current driveway grades near the pad are up to 20%; the area should be graded so that the
maximum grade does not exceed 5%.
9. The driveway off of Creekwood Drive may not be used to serve nor access the Halla Nursery
commercial operation.
10. Building Official Conditions:
a. A building permit is required to construct the platform and tower; the tower must be
designed for a wind load of 100 MPH 3-second gust wind load (ref. 2000 IBC, Sec.
1609) and include the effect of one-half inch of radial ice (ref. MSBC 1303.1800).
3
18
City Council Summary - November 26, 2007
b. The plans (tower and platform) must be signed by a professional engineer licensed in the
State of Minnesota.”
c. The contractor shall meet with the Inspections Division as early as possible to discuss
plan review and permit procedures.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
Councilman Litsey moved, Councilman Peterson seconded that the City Council approves
the Amendment to the Conditional Use Permit #07-04 for a 149-foot telecommunication
tower as shown on the site plan received October 5, 2007, subject to the following
conditions:
1. The applicant shall enter into a conditional use permit agreement and submit financial
security to guarantee the improvements.
2. The tower shall comply with the requirements in ARTICLE XXX. TOWERS AND
ANTENNAS of the Zoning Ordinance.
3. The tower shall not be illuminated by artificial means and shall not display strobe lights
unless such lighting is specifically required by the Federal Aviation Administration or other
federal or state authority for a particular tower.
4. No signage, advertising or identification of any kind intended to be visible from the ground
or other structures is permitted, except applicable warning and equipment information
signage required by the manufacturer or by Federal, State, or local authorities.
5. The applicant shall submit documentation at the time of building permit application showing
the height above grade for all potential mounting positions for co-located antennas and the
minimum separation distances between antennas. A description of the tower’s capacity,
including the number and type of antennas that can be accommodated should also be
provided.
6. The monopole color shall be the brand “Tnemac” and the color “Blue Elusion”.
7. All outdoor storage associated with the Halla Nursery and located within Outlot A, Halla
Maryanne Addition, shall be removed prior to issuance of a building permit for the tower and
the area shall be revegetated.”
8. If the tower is not used for communication purposes for a continuous 12 month period, it
shall be removed at the cost of the owner.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
COUNCIL PRESENTATIONS: None.
4
19
City Council Summary - November 26, 2007
5
ADMINISTRATIVE PRESENTATIONS: Todd Gerhardt provided feedback from the League
of Cities conference in New Orleans.
CORRESPONDENCE DISCUSSION. None.
Councilwoman Ernst moved, Councilman Peterson seconded to adjourn the meeting. All
voted in favor and the motion carried unanimously with a vote of 5 to 0. The City Council
meeting was adjourned at 7:35 p.m..
Submitted by Todd Gerhardt
City Manager
Prepared by Nann Opheim
20
CHANHASSEN CITY COUNCIL
REGULAR MEETING
NOVEMBER 26, 2007
Mayor Furlong called the meeting to order at 7:10 p.m..
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Litsey, Councilwoman
Ernst, Councilwoman Tjornhom, and Councilman Peterson
STAFF PRESENT: Todd Gerhardt, Roger Knutson, Kate Aanenson, Paul Oehme, and Todd
Hoffman
PUBLIC PRESENT FOR ALL ITEMS:
Laura Wondra 9590 Foxford Road
Kristine Kubisiak 1461 Heron Drive
Erin Schliesman 843 Ramsey Avenue, Carver
Madison Miller 8500 Allegheny Circle
Janet Paulsen 7305 Laredo Drive
Deb Lloyd 7302 Laredo Drive
Nick & Sarah Wierzbinski 7511 Canyon Curve
PUBLIC ANNOUNCEMENTS:
Mayor Furlong: Thank you and good evening and welcome to everybody here in the council
chambers as well as those joining us at home. I'd like to at this time just ask for members of the
council if there's any additions or modifications to the agenda. Otherwise without objection we'll
proceed with the agenda that was published with the packet. I'd like to start with public
announcements. First of all, with the holiday season approaching the city of Chanhassen in
cooperation with the Chanhassen Chamber of Commerce and our local businesses is proud to
announce our 2007 Tree Lighting party. The event will be held this coming Saturday, December
1st at City Center Park, right here by City Hall. The event runs from 5:00 to 6:00 p.m.. This is a
great time for family, children of all ages, parents, grandparents, children, grandchildren to come
out, enjoy some hot chocolate, some caroling. A visit from Santa. The lighting of our city
Christmas tree and other fun activities so would encourage people to come out this coming
Saturday between 5:00 and 6:00 p.m. here at City Hall. Excuse me, the City Center Park. Also
some other things going on, just to make sure people are aware the Chanhassen Lions Club this
year is conducting it's Christmas tree lot over by Cub Foods, so I encourage people to take a look
there. And this coming Sunday, December 2nd from 8:00 a.m. to 1:00 p.m. the City of
Chanhassen, along with the Chanhassen Rotary Club is sponsoring their annual Breakfast with
Santa. That's a pancake breakfast again for children and families of all ages so hope to see
people at those events. And at those locations.
CONSENT AGENDA:
Debbie Lloyd requested that item 1(e) be pulled to hear the vote on that item.
21
City Council Meeting - November 26, 2007
Councilman Litsey moved, Councilwoman Ernst seconded to approve the following consent
agenda items pursuant to the City Manager's recommendations:
a. Approval of Minutes:
-City Council Work Session Minutes dated November 13, 2007
-City Council Verbatim and Summary Minutes dated November 13, 2007
Receive Commission Minutes:
-Planning Commission Verbatim and Summary Minutes dated November 6, 2007
b. Resolution #2007-71: Stonefield Project 06-07: Approve Street and Utility
Improvements.
c. Approve Master Contract with Barr Engineering Company for Consulting Services,
PW009B.
d. Approve Nominations for 2007 Environmental Excellence Awards.
f. Resolution #2007-72: Approval of Resolution for Advancement of State Aid Funds for
Lyman Boulevard Improvement Project 06-03.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
1(e). LAKESIDE DEVELOPMENT, NORTHWEST CORNER OF LYMAN
BOULEVARD AND LAKEVIEW ROAD EAST, APPLICANT: SIENNA
CORPORATION: APPROVAL OF MINOR PUD AMENDMENT TO ADJUST
INTERNAL SERBACK REQUIREMENTS FROM 20 FEET TO 15 FEET AND
ADJUST THE WETLAND SETBACK CONSISTENT WITH CURRENT
WETLAND SETBACK REQUIREMENTS.
Mayor Furlong: At this point then is there a motion to adopt item 1(e).
Councilman Litsey: So moved.
Mayor Furlong: Is there a second?
Councilwoman Ernst: Second.
Mayor Furlong: Any discussion on the motion?
Councilman Litsey moved, Councilwoman Ernst seconded to approve the Minor PUD
amendment to adjust internal setback requirements from 20 feet to 15 feet and adjust the
wetland setback consistent with current wetland setback requirements for Lakeside
Development at the northwest corner of Lyman Boulevard and Lakeview Road East,
2
22
City Council Meeting - November 26, 2007
applicant, Sienna Corporation. All voted in favor and the motion carried unanimously
with a vote of 5 to 0.
VISITOR PRESENTATIONS:
Debbie Lloyd: Good evening. Happy Thanksgiving to everybody. That was a slam dunk. That
hasn't happened before but that's alright because I didn't have time to hang around tonight
anyway.
Mayor Furlong: I'm sorry, what are you?
Debbie Lloyd: My visitor presentation. I just had some questions for you.
Mayor Furlong: Okay.
Debbie Lloyd: Were you aware that if Eden Prairie didn't approve grading on the Eden Prairie
side of Lakeside, that the final plat wouldn't fit as proposed? Do you know if Eden Prairie
approved the grading? Were you aware that a condition of approval for the Lakeside final plat
was to meet the wetland setback ordinance? Were you aware that the new wetland setback
ordinance that you approved was the only nay vote being from Councilman Litsey were lower
standards for that particular wetland? Did you ever see a list of wetlands when reviewing the
ordinance changes? Do other land owners know how the changes affected them? Did you sent
out notification to all landowners with wetlands and advise them about the changes? Are you
aware that these lower standards, along with the amendment, which you just approved, the
change in the building side yard setback, were needed to make the Lakeside development meet
the wetland setback? Ironic don't you think that we need to lower standards and ease up on the
superior design of a PUD in order for the original condition of approval to be met.
Mayor Furlong: Anyone else from a visitor presentation standpoint? Okay. We'll move on
then.
LAW ENFORCEMENT/FIRE DEPARTMENT UPDATE.
Sgt. Peter Anderley: Good evening Mayor, councilmen. You should have in your packet the
numbers and stats for last month. If there's any questions I'd be happy to answer those. Couple
of things that I want to remind the public about, one reminder is the winter parking is in effect
from November 1st to April 1st. No vehicles can be parked on the street between 1:00 a.m. and
7:00 a.m. or during the day when we have 2 or more inches of snowfall and those streets have
been plowed. Just to remind everybody again. So far it's been pretty good. We get a lot of
cooperation and the guys out working the road are not running into a lot of problems with the on
street parking. Second thing is Chanhassen has a number of lakes in the city. It's starting to get
cold. We're starting to get some ice forming on there. Remind parents and everyone to you
know watch their kids. Make sure they're being safe on the ice. You know you need at least
probably, at least 4 inches before you even think about walking out there and every year you
know it seems like we hear somebody falls through and we'd like to try to avoid that if we can.
Second thing going along with the winter months, the driving. Remember when the roads start
3
23
City Council Meeting - November 26, 2007
getting bad, take a little time getting to where you're going. Leave a little early. And the second
thing is, we're still having a few thefts from vehicles occurring. You know again I'll just as a
reminder, make sure we're taking our personal belongings inside at night. The purses. The
laptop computers. Take some extra time and make sure you're securing your valuables before
you go. From a staffing point in the city, Corporal Eric Kittleson was promoted today to
Sergeant and is doing a general patrol position and he has been replaced with Deputy Phelps who
was offered the corporal position and took over as corporal in Chanhassen. So if you see him,
congratulate him and he will be here through 2008 as a corporal.
Mayor Furlong: We'll welcome him home as well so, any other questions? Questions for
Sergeant Anderley? No? Okay. Very good. Appreciate the update. Fire Department update
was included in our packet as well. Because of scheduling conflicts, no one is here from the fir
department. We did meet with the Chief this evening at our work session. Any questions for
Mr. Gerhardt that we can pass along to the fire department from their staff report this evening?
No? Okay. Then we'll just accept the report. Move on to the next item before us this evening.
T-MOBILE: REQUEST FOR CONDITIONAL USE PERMIT AND SITE PLAN
REVIEW AMENDMENTS TO ALLOW A 145 FOOT TELECOMMUNIATIONS
TOWER WITH A 4 FOOT LIGHTNING ROD AND A 6 FOOT PRIVACY FENCE;
LOCATED WEST OF GREAT PLAINS BOULEVARD, NORTH OF CREEKWOOD
DRIVE, SOUTH OF HALLA NURSERY, AND EAST OF BLUFF CREEK GOLF
COURSE (OUTLOT A, HALLA MARYANNE ADDITION). APPLICANT: T-MOBILE
USA.
Kate Aanenson: Thank you Mayor, members of the council. You saw this item back on April,
2007 and did approve a conditional use and site plan permit. Since that time it was determined
that approval was required from the State's Historic Preservation Office. Cell towers, because
they're regulated by the FCC, is required to get their approval. It is noted that there is a property
eligible for the historic preservation and therefore they did request, the State Historic
Preservation, working with Carver County, to move that location so I'll go through and explain a
little bit about that. Again, as you indicated, the site just south of the Halla Nursery. The
property here. The location that was previously approved was in this area. I'm not going to go
back through and explain how we ended up at this location because I think that you're on the
record stating that this…T-Mobile most suitable location. But this was approved and shows
the… This is the property that is eligible for the Historic Register. Because of that and the FCC
requirements for historic preservation, it was determined to be moved over to this side of the
property. They moved it up in here. If you can just back out for a second. So this is the building
envelope area that would be permitted, leaving all the setbacks because of the height of the
structure that's required. It's 145 feet with a 5 foot antenna. It does require a certain fall area, so
this area in the black is the area that would be permitted with the zoning regulations so they
moved it over to this corner here, and I'll go through that.
Mayor Furlong: Where did, excuse me? The yellow is where it was originally?
Kate Aanenson: Where it was, yeah. So I'll show you again this is the tower, approximate tower
location again and then some site perspectives from the, so we've got, so we'd be going back.
4
24
City Council Meeting - November 26, 2007
There's 1, 2, 3, so Creekwood… This is the first perspective of the tower. This would be from
the site along the...and then this would be the one on the easterly side. Again the site itself will
be fenced. They will have equipment. It will be landscaped around the entire structure. Because
it's in the middle of that landscaped area, it shouldn't be visible, the structure itself. Again it's
145, 145 feet high. At the Planning Commission meeting on November 6th there was some
discussion regarding visibility, does blend in or not. Staff believes that the color meets that
intent. We actually went through a lot of discussion with the Planning Commission trying to
decide to use different colors but the majority in the 6 to 1 vote felt that that was the best color.
There was some other comments regarding obsolete technology which we discussed, and also
who benefits from that and again that's part of the whole regulations permitting process that
they're required to do. So with that and the Planning Commission's recommendation 6 to 1 to
approve staff is recommending approval for the relocation to meet the requirements of the
Historic Preservation Act with the conditions of approval in the staff report so I'd be happy to
answer any questions.
Mayor Furlong: Thank you. Any questions for staff?
Councilwoman Tjornhom: I have one question. I should have asked this myself Kate so I'm
sorry but when you just showed us the views from the tower, those views, I know, is that from
someone's back yard that we're seeing that? I should know…
Kate Aanenson: It's a little hard to see the red dots, but that'd be the view from the Mills
property…sampling of their property so that would be the views from those properties to the
tower.
Councilwoman Tjornhom: And they're residential properties?
Kate Aanenson: That's correct. Correct.
Councilwoman Tjornhom: And did you hear from those residents?
Kate Aanenson: Yes. Yeah, at the Planning Commission there was the concern, moving it.
While it protected the historic house, actually there's more homes on that side, the golf course
side and Creekwood, Mandan. Some of those residents felt that they had the more visual impact.
I'm not sure there's a good answer for us in that regard. But it meets the requirements for the
view from the historic home, that's what the requirement. They were concerned about that. That
they were now, have the impact.
Councilwoman Tjornhom: Yeah, because it is out there.
Kate Aanenson: Correct.
Mayor Furlong: Any more questions? Couple things. Clarification. This is a conditional use
permit, correct?
Kate Aanenson: Correct.
5
25
City Council Meeting - November 26, 2007
Mayor Furlong: Not an interim use permit.
Kate Aanenson: Correct.
Mayor Furlong: So this will go with the property. The question raised about obsolescence and
such like that is, I understand from reading the report that local municipalities have some, are
somewhat restrictive in terms of limiting these towers but from an obsolescence standpoint, is
there any opportunity to include as far as conditional use permit, something with regard to
abandonment and requiring it to be removed at that point?
Roger Knutson: I think you could do that. I don't see why not. Sure. It's the first time I've
heard anyone suggest it. Everything gets obsolete at some point I guess. They're still putting
them up. They're still using them.
Mayor Furlong: Right, but I think you know the question was raised in terms of technology
advancing and clearly we've dealt with that on other issues here and if perhaps you know we
address that at that time, if the use of the tower you know for some period of time or it's no
longer used for a period of.
Roger Knutson: I can suggest a year.
Mayor Furlong: 12 months, that it would need to be removed.
Roger Knutson: I think that'd be perfectly fine.
Kate Aanenson: And then I just wanted to also indicate that the way we set up our ordinances to
encourage co-location.
Mayor Furlong: Right.
Kate Aanenson: So if somebody else was to come on this, like we had a strong indication that
another user provider will be on that, it does not go back through the process because that's
encouragement to co-locate.
Mayor Furlong: Absolutely.
Kate Aanenson: So they would, another user could go on this site and they're working,
negotiating on that now.
Mayor Furlong: On the same tower.
Kate Aanenson: That's correct.
Mayor Furlong: Yep, and that I think, you know so we don't have 3 or 4 towers sitting next to
each other, I think that's a very good policy. But at the same time if there are no more users and
6
26
City Council Meeting - November 26, 2007
you know, at some point in time in the future, since there is no other limit with that, I would
suggest that and offer that to the council for consideration at least. Any other questions?
Councilwoman Ernst: Just a comment. Then just basically you're saying what was in our
packet, it looks like the tower will probably become obsolescence within 5 years? Or after 5
years.
Kate Aanenson: I'm not sure.
Mayor Furlong: I think that was someone's.
Councilwoman Ernst: I thought it was saying that it'd be less than 5 years.
Mayor Furlong: That might have been a statement by someone at the Planning Commission. I
guess I would avoid any false hopes if someone has that. My only thought is, as a conditional
use, which if that's what's being asked for, that we would you know, if it's no longer being used,
then it would be removed, or required to be removed and then if there's another use in the future,
they'd go through the process.
Councilwoman Ernst: I was just surprised to see that. I didn't think 5 years, 5 years seemed like
an awful short time.
Mayor Furlong: But to Ms. Aanenson's point about co-location and, I think that's a good policy
and certainly support that. Absolutely. Any other questions? For staff at this point. Okay.
There was a public hearing at the Planning Commission, correct?
Kate Aanenson: That's correct.
Mayor Furlong: Okay, I didn't know, is there anybody here that wanted to provide public
comment that they didn't have an opportunity to provide at the Planning Commission? If not
then we'll bring it to council for thoughts and discussion.
Councilman Litsey: I like your suggestion of I think the 12 month if it's not in use, take it down.
Otherwise I think it's pretty straight forward.
Mayor Furlong: Okay. Any other thoughts or comments? Okay. There's a motion in the staff
report. What page is it on?
Kate Aanenson: I believe it's on page 17.
Mayor Furlong: 17 of the staff report that went to the Planning Commission?
Kate Aanenson: I believe the motion is actually on page 16. The condition use is where you
want to amend for the 1 year would be on page 17.
Mayor Furlong: Okay, let me find that. …would be 18.
7
27
City Council Meeting - November 26, 2007
Kate Aanenson: Yeah, would be the beginning of the conditional use.
Mayor Furlong: I want to get there so I can have, do you have it there Bryan?
Kate Aanenson: It'd be condition, you'd add number 8.
Councilman Litsey: I'm on page, on 18.
Mayor Furlong: So there's a site plan review as well as the conditional use.
Kate Aanenson: The conditional use would be the non-use for one year would…
Mayor Furlong: Under the conditional use conditions? Is there specific language you want us to
include in there Mr. Knutson?
Roger Knutson: If the tower is not used for communication purposes for a continuous 12 month
period, it shall be removed.
Mayor Furlong: At the cost of the owner.
Roger Knutson: At the cost of the owner, of course.
Mayor Furlong: So that would be suggested language for condition number 8. Councilman
Litsey, would you like to make the motion there starting with going on page, bottom of page 16?
Councilman Litsey: Yeah. Site Plan Review, make a motion the City Council approve the
amendment to the site plan permit 07-04 for a 149 foot telecommunication tower and a 6 foot
cedar fence as shown on the plan received October 5, 2007 subject to the following conditions,
and there's conditions 1 through 10. Should we do these in two separate motions or?
Mayor Furlong: Let's do them together, unless there's objection.
Councilman Litsey: Okay. Then under conditional use permit, City Council recommend
approval of the amendment to the Conditional Use Permit 07-04 for a 149 foot
telecommunication tower as shown on the site plan received October 5, 2007, subject to the
following conditions 1 through 7 and also 8 as discussed tonight.
Mayor Furlong: As stated by Mr. Knutson.
Councilman Litsey: As stated by Mr. Knutson, thank you.
Mayor Furlong: Thank you. Is there a second to that?
Councilman Peterson: Second.
8
28
City Council Meeting - November 26, 2007
Mayor Furlong: Made and seconded. Any discussion on the motion? No?
Councilman Litsey moved, Councilman Peterson seconded that the City Council approves
the Amendment to the Site Plan Review #07-04 for a 149-foot telecommunication tower and
a 6-foot cedar fence as shown on the site plan received October 5, 2007, subject to the
following conditions:
1. The applicant shall enter into a site plan agreement and submit financial security to guarantee
the improvements.
2. Clearing for the tower and equipment pad shall be no greater than 15 feet from the edge of
the pad.
3. A maximum of 25 feet is allowed for clearing the access road to the site. Trees shall be
preserved to the greatest extent possible.
4. The applicant shall install a minimum of eight Black Hills spruce around the equipment
platform. Trees shall be at least six feet in height.
5. Site grading and vegetation removal shall be minimized to the greatest extent practical. If
any excess material is anticipated to be generated as a result of access road construction, the
disposal location must be approved in writing by City staff prior to road construction.
6. A rock construction entrance complying with the City’s standard detail (#5301) shall be
included on the Erosion and Grading Plan and shall be constructed prior to the remainder of
the gravel road.
7. If applicable, the applicant shall apply for and obtain permits from the appropriate regulatory
agencies (e.g., Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control
Agency) and comply with their conditions of approval. (Watershed district and MPCA permits
are necessary if the total disturbed area is in excess of 1.0 acres).
8. The current driveway grades near the pad are up to 20%; the area should be graded so that the
maximum grade does not exceed 5%.
9. The driveway off of Creekwood Drive may not be used to serve nor access the Halla Nursery
commercial operation.
10. Building Official Conditions:
a. A building permit is required to construct the platform and tower; the tower must be
designed for a wind load of 100 MPH 3-second gust wind load (ref. 2000 IBC, Sec.
1609) and include the effect of one-half inch of radial ice (ref. MSBC 1303.1800).
b. The plans (tower and platform) must be signed by a professional engineer licensed in the
State of Minnesota.”
9
29
City Council Meeting - November 26, 2007
c. The contractor shall meet with the Inspections Division as early as possible to discuss
plan review and permit procedures.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
Councilman Litsey moved, Councilman Peterson seconded that the City Council approves
the Amendment to the Conditional Use Permit #07-04 for a 149-foot telecommunication
tower as shown on the site plan received October 5, 2007, subject to the following
conditions:
1. The applicant shall enter into a conditional use permit agreement and submit financial
security to guarantee the improvements.
2. The tower shall comply with the requirements in ARTICLE XXX. TOWERS AND
ANTENNAS of the Zoning Ordinance.
3. The tower shall not be illuminated by artificial means and shall not display strobe lights
unless such lighting is specifically required by the Federal Aviation Administration or other
federal or state authority for a particular tower.
4. No signage, advertising or identification of any kind intended to be visible from the ground
or other structures is permitted, except applicable warning and equipment information
signage required by the manufacturer or by Federal, State, or local authorities.
5. The applicant shall submit documentation at the time of building permit application showing
the height above grade for all potential mounting positions for co-located antennas and the
minimum separation distances between antennas. A description of the tower’s capacity,
including the number and type of antennas that can be accommodated should also be
provided.
6. The monopole color shall be the brand “Tnemac” and the color “Blue Elusion”.
7. All outdoor storage associated with the Halla Nursery and located within Outlot A, Halla
Maryanne Addition, shall be removed prior to issuance of a building permit for the tower and
the area shall be revegetated.”
8. If the tower is not used for communication purposes for a continuous 12 month period, it
shall be removed at the cost of the owner.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
COUNCIL PRESENTATIONS: None.
ADMINISTRATIVE PRESENTATIONS:
Todd Gerhardt: Nothing to add. Been a quiet 2 weeks here so.
10
30
City Council Meeting - November 26, 2007
11
Mayor Furlong: Just ask how the League of Cities went.
Todd Gerhardt: It was great. We attended most of the sessions and there was courses in
sustainability, transportation. We heard speakers from Mayor Bloomberg from New York speak.
New Orleans Mayor Najin, I think was his name, and.
Councilwoman Tjornhom: Nagin.
Todd Gerhardt: Nagin, there you go. And encouraged people to spend lots of money and help
the community, like all good mayors do. But especially in New York and New Orleans with
their tragedies that they had. We did get the opportunity to tour some of the devastated areas
which Katrina had happened to go through there and where the levies broke. What was it, Ninth
Ward still hasn't been reconstructed. I think we traveled several miles in that area. Some of the
commercial buildings you were starting to see come back but none of the single family homes. I
think we saw one in the Ninth Ward that was reconstructed. A couple of them are starting to
remodel but they definitely need more help down there financially. I think there's some policy
decisions that they need to make locally regarding allowing some of the people to re-build in
those areas. Those people that do re-build have to raise their homes up. I think that has some
issues. There's no uniformity in the housing stamps as you look at it, as you drive along the
boulevard. But you know they still need a lot of help in rebuilding. The market's changed.
There are a lot of people moved out of town. Hundreds of thousands of people and that's
changed their market so you know a lot of businesses had to close because of that so, they're
really trying to reinvent themselves. The downtown's strong. You know that's up to about 100%
capacity and definitely you've got to have the tours and things going on there and Bourbon Street
and the casino and the river walk area is doing well there.
Mayor Furlong: Very good, thank you. Any other questions for Mr. Gerhardt?
CORRESPONDENCE DISCUSSION. None.
Mayor Furlong: If not, we will continue the last item of our work session in the Fountain
Conference Room and we will be following, that will be a public session, even though it was
listed as an executive session. Also I see we might have some students here tonight. Just a
suggestion, make sure you sign in to the sheet over at the table over there. If you're not on that
list, please do so so you get credit for being here. With that, is there a motion to adjourn?
Councilwoman Ernst moved, Councilman Peterson seconded to adjourn the meeting. All
voted in favor and the motion carried unanimously with a vote of 5 to 0. The City Council
meeting was adjourned at 7:35 p.m..
Submitted by Todd Gerhardt
City Manager
Prepared by Nann Opheim
31
CHANHASSEN CITY COUNCIL
WORK SESSION
DECEMBER 3, 2007
Mayor Furlong called the work session to order at 5:40 p.m..
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Litsey, Councilwoman
Ernst, Councilwoman Tjornhom, and Councilman Peterson
STAFF PRESENT: Todd Gerhardt, Laurie Hokkanen, Greg Sticha, Danielle Washburn and
Katie Reed
UPDATE ON UTILITY RATE STUDY.
Greg Sticha explained the tiered utility rate system being proposed based on water usage, noting
staff has received comments since it was first proposed with concerns about multiple dwelling
units and commercial accounts with multiple tenants sharing a common irrigation system. He
reviewed the positives and negatives of five alternatives being proposed. Todd Gerhardt asked
for Public Works Director/City Engineer Paul Oehme's reaction to a 3 tier versus 4 tier system.
Mr. Sticha noted that Mr. Oehme felt the DNR would prefer to see 4 tiers over 3. After
consideration of the five alternatives, staff would prefer either alternative 2 or 5. Councilwoman
Tjornhom asked to see the number of households with water usage over 25,000, 50,000 and
75,000 gallons currently. The council discussed advantages and disadvantages to scenario 2 and
5, looking at specific examples for each scenario. Councilman Litsey asked if staff had looked
into using summer and winter rates. Greg Sticha explained that staff was trying to balance
conservation versus equity. Mayor Furlong reviewed each alternative and asked for council
feedback and whether they would like to see the rate system stay as it is currently or change to
one of the proposed scenarios. Councilman Litsey liked alternative 5 with a 3 tier system.
Councilwoman Ernst asked if these were the only options available, noting it was important to
educate the public on why an increase in rates is happening with any alternative. Mayor Furlong
stated he would like to see the Environmental Commission spearhead the initiative in educating
the public on water conservation measures. Councilwoman Tjornhom stated alternative 5 was
the most black and white, but still had concern with big commercial users. Mayor Furlong liked
the simplicity of alternative 5. Councilman Peterson stated he liked alternative 5, noting he was
not so concerned with the percentage amounts but was okay with raising the high end user to
promote conservation. Mayor Furlong asked that this item be placed on the December 10th
agenda as a discussion item rather than on the consent agenda. The City Council discussed
which percentages to use with alternative 5, settling on 5, 5, and 25.
DISCUSSION OF 2008 BUDGET AND 2008-2012 CAPITAL IMPROVEMENT
PROGRAM.
Todd Gerhardt reviewed how the Truth in Taxation hearing process will proceed. Greg Sticha
reviewed changes that have occurred since the September meeting and their affect on the levy
numbers. Councilwoman Ernst asked for clarification on taking the $100,000 from the special
assessment debt and reallocating it to the local street improvement fund. Todd Gerhardt
32
City Council Work Session - December 3, 2007
2
explained how and why that $100,000 became available as a one time event. Councilwoman
Tjornhom asked for the cliff note version of what the council and residents will see at the Truth
in Taxation hearing presentation.
The work session was recessed at 7:00 p.m.. It was reconvened at 7:20 p.m..
CONTINUATION OF THE 2008 BUDGET AND 2008-2012 CAPITAL IMPROVEMENT
PROGRAM DISCUSSION.
Greg Sticha explained that there is an amount totaling $270,000 and asked where and how the
city council wants to redistribute, reallocate or eliminate any or all of that amount, showing two
specific examples of how the money could be reallocated. Councilman Litsey asked about using
the health insurance cost savings today to allocate for anticipated health insurance increases in
the future. Councilman Peterson asked for clarification on pure spending numbers. Mayor
Furlong discussed how the current numbers being presented compared to the three scenarios
presented in September and asked what sort of commitment the City Council wants to give to
street and road projects. Councilwoman Tjornhom talked about wants versus needs, stating
because of growth there should be no disagreement that the city needs better roads. Todd
Gerhardt reviewed several individual street projects that will be needed in the near future.
Mayor Furlong explored different options on ways to reallocate the money from the additional
building inspector position and savings in the health insurance and asked of the two scenarios
presented by staff, where does the council want to be. Councilman Peterson stated his
preference to come in below the preliminary levy amount, picking a specific amount of $250,000
which would be dedicated to street improvements in 2008. The remainder of council agreed with
the $250,000 amount, except Councilman Litsey stated he could go as low as $230,000 but
would be comfortable with $250,000 as well. The council then went on to discuss the police
contract and timeline for hiring of the new investigator position and deputy, and how that timing
would affect the money budgeted for law enforcement. Councilwoman Ernst stated she would
like to see more data to validate the need for the new positions. Council members noted that
compared with other communities, Chanhassen's numbers were statistically lower, and the need
to trust Sheriff Olson when he says his department needs the additional positions.
Mayor Furlong adjourned the public portion of the work session at 8:20 p.m.. The council
then reconvened in an executive session to discuss the tabulation of the City Manager's
Performance Evaluation.
Submitted by Todd Gerhardt
City Manager
Prepared by Nann Opheim
33
CHANHASSEN CITY COUNCIL
TRUTH IN TAXATION HEARING
DECEMBER 3, 2007
Mayor Furlong called the meeting to order at 7:05 p.m.. The meeting was opened with the
Pledge to the Flag.
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Litsey, Councilwoman
Ernst, Councilwoman Tjornhom, and Councilman Peterson
STAFF PRESENT: Todd Gerhardt, Roger Knutson, Laurie Hokkanen, and Greg Sticha
PUBLIC PRESENT:
Curt Robinson 202 West 77th Street
Sarah Wierzbinski 7511 Canyon Curve
PUBLIC HEARING ON THE 2008 BUDGET AND LEVY.
Mayor Furlong: Thank you everybody and welcome to those here in the council chambers as
well as those watching at home. Tonight is the Chanhassen City Council's Truth in Taxation
hearing. We will start with a presentation by staff for the preliminary budget and levy that was
approved back in September, and then provide opportunity for interested parties to come up and
make comment to the City Council. We will not be deciding on any budget or levy items this
evening. We're continuing to discuss those in our work sessions and will be continuing after we
receive public comment. We will be making a decision at our regular council meeting next
Monday night, December 10th at that time so if, at this point, unless there's any modification to
the agenda, I'll ask staff to make a presentation regarding a Truth in Taxation preliminary budget
and levy.
Greg Sticha: Thanks Mayor and council members. As the Mayor has pointed out, the Truth in
Taxation hearing is a required process by law. The Truth in Taxation hearing is required in the
case of raising your levy over the state percentage, implicit percentage increase rate, which I
believe for this year was 4.5%. The preliminary levy that Chanhassen set in September only
increased the levy 2.9%, therefore legally we were not required to hold a Truth in Taxation
hearing but we have in the past practiced going through the Truth in Taxation hearing regardless
of the amount of the increase in the levy that we are planning on so we are still having the Truth
in Taxation hearing tonight, even though legally we did not have to. The required elements for
holding a Truth in Taxation hearing and a, the entire budget process, I just kind of want to briefly
go over those. I'm going to present the proposed 2008 budget that was set in September. I'm
going to be presenting the proposed 2008 tax levy that was set in September. We will be
discussing any major changes to the budget and levy that took place in 2008 compared to 2007,
and then we will hold the public hearing and take input and comments after my presentation and
as the Mayor's pointed out, we will be adopting the levy and budget on December 10th, next
week. Just to kind of give a short backdrop on what the budget process all involves. We begin
talking about budget as early as June actually, but in July our department heads submit
34
Chanhassen Truth in Taxation Hearing - December 3, 2007
preliminary budgets to the city manager and myself. We review those budgets and then in
August come to City Council with a recommended or early preliminary levy and tax levy for the
upcoming year. During those work sessions we discussed various alternatives and funding ideas
for all kinds of different things, including levies for our general fund, our capital improvement,
replacement fund and our debt levies. At that point in September we then set a preliminary levy.
The preliminary levy set on September 15th is what the Truth in Taxation's property tax notices
go out based on. At that point we cannot lower, or cannot increase our total levy dollars that we
request from our residents. We can only lower it after we set the preliminary levy in September.
In October and November we hold detailed budget meetings and go through each department by
department's budget request for the upcoming year and discuss other items affecting the levy,
including debt levies and our, like I said, our capital replacement fund levy, and then this
evening we hold a Truth in Taxation hearing to take public comment and input on the proposed
preliminary levy and preliminary proposed levy, and then on December 10th we will adopt the
budget. Let's take a look at what has changed from our 2007 budget versus our 2008 preliminary
budget that we passed in September. Looking at just the general fund expenditures, the 2007
budget had a total of $9,062,000 and budgeted expenditures 2008 we are requesting $9,336,000.
A 3% increase in total spending in the general fund. And you can see the breakdown by areas of
function. General government, law enforcement, public works, community development. You'll
note the largest increase dollar wise is in law enforcement and percentage wise. In the 2008
budget we do have a new position in the budget for law enforcement totaling about $100,000.
This makes up quite a large percentage of the increase in total spending in the general fund.
Revenues also went up by 3% representing a balanced general fund budget. We presented a
general fund budget back in September. Property taxes had increased 4.7%. Licenses and the
permits, we are projecting a decrease in that revenue line item due to the down turn in the current
market for building. And the other slight increase, there was a slight increase in fines and
penalties, dollar wise it's, percentage wise it looks much larger but we did increase the amount
for fines and penalties in that category by I believe it was about $15,000. Look at our history of
our spending in our general fund. You can see that the spending increase this year was 3%. Last
year we had an increase in spending of 5%, and the previous years before that, taking a look at
this chart show you the increases in general fund spending. What factors changed in 2008
budget? Our operating expenditures remain relatively flat. Total general fund expenditures
increased to 3%. The police contract accounts for 74% of the increased expenditures, and that
would be the one additional officer and the 5% increase for wages. That makes up 74% of the
increase in the total general fund budget. Then we need to talk about what effects the actual levy
or the amount we are asking from our residents to help fund the operations of the city. The
general fund levy with an increase of 4% based on the preliminary levy that we set earlier this
year. We kept the capital replacement fund levy the same. The sealcoating levy went up slightly
based on a schedule that we've had in place for 5 years now. This is the last increase in the
sealcoating schedule. At this point forward the levy for that will remain flat unless we were to
need additional funding for sealcoating our streets, at which point we would certainly be coming
to council for, asking for additional funding in this area. Our debt levies then are the other
remaining levies that we need to ask for money. General obligation debt had a large increase.
That increase is mostly due from, we had to increase the levy for our 212 bonding, which is now
nearing completion and we will begin our first bond payment to the State of Minnesota next
summer in August of '08 so that's the main reason for the increase in the general obligation debt.
And on this schedule you do see, I just noticed that, a typo. You see the local street
2
35
Chanhassen Truth in Taxation Hearing - December 3, 2007
improvement levy of $100,000. At the time we set the preliminary levy, that $100,000 was
actually up under the special assessment debt levy. We will be discussing that amount further in
work sessions and then next week as well. Market value levies. The market value levies are
different than the regular debt levies. These levies are paid for by the residents only in our
community. Not by our commercial industrial users. They have a little, they're voter approved
levies so that is the reason behind why, who's paying for the levies. Who's paying for that. I
should note the amount of $425,914 for the park referendum levy, that bond payment is actually
higher than that but in our levy, debt levy schedule we do plan on using cash reserves to buy
down that amount and that is the difference in that amount. The debt levy in total, with the use
of cash reserves, will remain the same as the prior year. There is no increase in the debt levy.
The net tax levy effects, based on the preliminary budget and levy we set will, is a general fund
levy increase of 4.7%. A total tax levy increase of 2.92%. We put together a schedule of 6
example properties in the city of Chanhassen and based on their Truth in Taxation statements
that they received here within the last few weeks, noted the increase in value of these 6 homes
and the percent that the city's property tax bill will go up for each of those properties. You'll
notice that in most cases property owners will see either the same property tax bill or a slight
decrease in their property tax bill. At this point staff's recommendation would be to hold a
continuation hearing if needed on Monday, December 10th and adopt the levy and budget at that
point in the evening. And with that I will answer any questions about the preliminary budget
and levy that we set in September.
Mayor Furlong: Thank you. Is there any questions for staff at this point?
Councilman Litsey: I just want to thank you for the hard work you've done and others as well
for a good job and presenting to the council the numbers and to the city and helping us with this
decision…thank you.
Greg Sticha: Appreciate it.
Mayor Furlong: Good. Any other questions at this point? If not then, without objection we'll
open up the hearing for the 2008 Truth in Taxation hearing. Invite any interested parties to come
forward and speak to the council. You're the only one.
Councilwoman Tjornhom: You know a joke or anything?
Councilman Peterson: Motion to close the public hearing.
Mayor Furlong: Thank you. Is there any reason, you had said, or before I entertain that motion
Councilman Peterson, the last comment was if necessary on the continuation. What would
require an if necessary? If with volume or just the desire of the council?
Greg Sticha: In either case you could continue the hearing. If there was an over abundance of
volume tonight, that would be one reason.
Mayor Furlong: Okay.
3
36
Chanhassen Truth in Taxation Hearing - December 3, 2007
4
Greg Sticha: Or if for some reason council wanted to open the hearing again at the next meeting
to give another opportunity, they could do that. Would not be required to do so, but they could.
Mayor Furlong: I see. Okay, thank you. Seeing we don't have an over abundance on that
category, it would be strictly if we wanted to. So Councilman Peterson has made a motion,
which I will now entertain to close the Truth in Taxation public hearing. Is there a second?
Councilwoman Ernst: Second.
Mayor Furlong: Made and seconded. Any discussion on closing that? Seeing none, we'll
proceed with the vote.
Councilman Peterson moved, Councilwoman Ernst seconded to close the public hearing for
the Truth in Taxation hearing. All voted in favor and the motion carried unanimously
with a vote of 5 to 0.
Mayor Furlong: The Truth in Taxation hearing is closed. Given that there's nothing else to
come before the council this evening on this matter, is there a motion to adjourn our Truth in
Taxation hearing?
Councilwoman Ernst moved, Councilman Peterson seconded to adjourn the Truth in
Taxation hearing. All voted in favor and the motion carried unanimously with a vote of 5
to 0. The Truth in Taxation hearing was adjourned at 7:15 p.m..
Submitted by Todd Gerhardt
City Manager
Prepared by Nann Opheim
37
CHANHASSENPLANNING COMMISSION
REGULARMEETING
SUMMARY MINUTES
NOVEMBER 20 2007
ChairmanMcDonald calledthe meeting toorder at7 00 p m
MEMBERSPRESENT JerryMcDonald Kevin Dillon KathleenThomas Debbie Larson
MarkUndestad and DanKeefe
MEMBERS ABSENT KurtPapke
STAFF PRESENT KateAanenson Community Development Director Bob Generous Senior
Planner andAngie Auseth Planner I
PUBLICHEARING
HART VARIANCE REQUEST FOR AVARIANCE TO EXCEED THE MAXIMUM
DETACHEDACCESSORY STRUCTURESIZETO CONSTRUCTAN ADDITIONTO
AN EXISTING DETACHED GARAGE ON PROPERTY ZONED RURAL
RESIDENTIAL RR LOCATED AT951 HOMESTEAD LANE APPLICANT JDADESIGNARCHITECTSOWNERSJOHNCINDYHARTPLANNINGCASE07 28
Public Present
Name Address
John Cindy Hart 951 Homestead Lane
John Meyering 1050 Homestead Lane
AngieAuseth presented the staffreporton this item Commissioner Undestad asked forclarificationonthetimelineofthepermitsandvarianceapplicationCommissionerLarson
asked about public notification Commissioner Dillon asked about theapplicantswillingness to
work with the city Theapplicant John Hart provided backgroundinformation on their plans to
expand the garage and theintended purposefor the expansion Chairman McDonaldopened the
public hearing John Meyeringspoke in support ofthe variance request noting the houses intheneighborhoodareon212acrelotsChairmanMcDonaldclosedthepublichearingAfter
commentsanddiscussion bythe commission the followingmotion was made
Larson moved Undestadseconded thatthe PlanningCommission approvePlanning Case
07 28 for a 177square footvariance fromthe maximum 1 000 square foot detachedaccessorystructureforanadditiontoadetachedgarageonLot2Block3PioneerHills
Addition based on the amendedfindings offact statingthere arepre existing standards in
the neighborhood ofdetached structures whichexceed 1 000 square feet All voted in
favor exceptKeefe whoopposed and the motion carriedwitha vote of5 to1
38
PlanningCommission Summary November20 2007
PUBLICHEARING
ROSEMOUNT REQUESTFOR INTERIM USE PERMITTO ALLOW ATEMPORARYANTENNAONTOPOFABUILDINGLOCATEDAT8200MARKET
BOULEVARD APPLICANT ROSEMOUNT INC PLANNINGCASE 07 25
Angie Auseth presentedthe staff reporton this item Chairman McDonald asked ifstaff had
checked on federal regulations KellyOrth with Rosemount Incexplained the reason fortheirrequestandhowthewirelesssystemwillbetestedCommissionerUndestadaskedabout
possible frequency interference and the antenna locations on the building KellyOrth showed
samples ofthe antennas thatwillbe used in their testing CommissionerLarson asked about the
purpose ofthe testing ChairmanMcDonald opened the public hearing No onespoke andthe
public hearing wasclosed After comments from the commissionthe following motion wasmade
Keefe moved Dillon secondedthatthe PlanningCommission recommends approval of
PlanningCase 07 25 foran InterimUsePermit toinstall a 25 footmast antennaatop the
two storyoffice buildingatRosemount Inc located onLot 1 Block1 ChanhassenLakesndBusinessPark2AdditionasshowninplansdatedreceivedNovember22007basedon
the FindingsofFact in the staff reportandsubject tothe followingconditions
1 Abuildingpermit must be approved priortoinstallation ofthe mast antenna
2 The interimuse permitis valid for a period ofsix 6 months from the dateofbuilding
permit approval Should theinterim usepermit needtobe extended the applicant will
needtorequest a formal extension 60 daysprior tothe expirationdate ofthe permit
3 Approval ofthis applicationis contingent uponCity Council approval ofthe zoningordinanceamendmenttoSection201515Antennasmountedonroofswallsand
existing towers requiring an Interim UsePermit IUP for antennas inexcess of15 feetin
height
All voted in favorandthe motion carriedunanimouslywitha vote of6 to0
PUBLICHEARING
ORDINANCE AMENDMENT CHAPTER20 ZONING
AngieAuseth presented the staffreporton this item Commissioner Keefe suggestedthat item 2under201515statethattheantennasbeofamaterialorcolorthatmatchesthesurroundingarea
ratherthan building Commissioner Dillon asked iftheresa need toaddress diameter guide
wires etc associated with antennas Chairman McDonaldopened the publichearing No one
spokeand the public hearingwas closed
Dillon moved Larson seconded thatthe Planning Commissionrecommends that the City
Council adoptthe attached ordinance amending Chapter 20 ofthe ChanhassenCity Code
with a change tothe language in item 2 underSec 20 1515 tosay thatthematerial or
2
39
PlanningCommission Summary November20 2007
colormatches the surrounding environment All voted in favorand the motion carried
unanimouslywith a vote of6 to0
PUBLICHEARING
COMPREHENSIVE PLAN CHAPTER2 LAND USEELEMENT
Public Present
Name Address
MikeWardle 12601 W Explorer Drive 200
Boise ID 83713ScottRaeber12601WExplorer Drive 200
Boise ID 83713
Ben Gowan 6440Hazeltine Boulevard
Tom Workman 181 South Shore Court
DonHalla 6601 Mohawk Trail EdinaMaryJaneWhite670Creekwood
RickDorsey 1551Lyman Boulevard
JeffFox 5270 HowardsPoint Road
Vernelle Clayton 422 Santa Fe Circle
DavePatchin 17370 Lookout DrivethSeanCullen1980028AvenueNo Plymouth
Jim Boyum 8805 Sunset TrailthWaynePeterson744464StreetWest
DaleHance 6480OrioleAvenue
BillZiegler 6441OrioleAvenuethMichelleMCurtis2446West64Street
Kate Aanensonprovided asummary ofwhatwork hasbeen donetodate and theschedule for
future reviewand comments She thenreviewed the landuse elementsincluded in the
comprehensive planupdate Bob Generous reviewed the specific parcels ofland with theirrecommendedlandusechangesChairmanMcDonaldaskedforclarificationontheneedfor a
newcommunitycommercial zoning Hethenopened thepublic hearing Ben Gowan 6440
Hazeltine Boulevardstatedhes been advised thatthe change inzoning proposed for his property
is not all bad TerryPalmer Ben Gowans son asked for clarification on access optionstohis
fathersproperty GaryReed theowner of2 21 acresnorth ofBenGowan sparcel stated theyarereadyfordevelopmentoftheirpropertyMichaelSedleySedleyDevelopmentPartners2460
Emerald Trail in Minnetonka a developer workingwith Mr Reed asked toclarify thatif the
propertyowners northor south dontdevelop but wereamenable toan easement access thatthat
would be okay with the city Phil Boss owner ofBody Mind Spirit retail acrossthe street from
Market Square asked ifthe cityhaslooked atthe economic impacts on downtownretailthbusinessesifaregionalcenterisbuiltMelBrooks2448West64statedhewouldlike tosee
the zoning stayatsingle family residentialon the propertyowned byGary Reed MichellethCurtis2446West64Streetaskedforclarificationonaccess
3
40
PlanningCommission Summary November20 2007
The PlanningCommission tooka shortrecess atthis pointin the discussionand then continued
with the public hearing
Vernelle Clayton 422SantaFe Circle andlong time developerand manager ofretail space in
downtown Chanhassen emphasized the needtonot forget about the viability ofretail in
downtown Chanhassen and quotedfrom the 1998 comprehensive plan updatewhich states there
is no desire on the part ofthe citytoseethateffortdiminished with construction ofcommercialcentersorientedtohighwaysoutsidethebusinessdistrictnotinghermainpurposeistoavoid
having the actionofa governmental entity create an unfair competitive situationfor the
downtown businesses Mike Wardle with Brighton Corporation Boise Idaho gave a power
point presentation on a proposal they willmake byformalapplication the early partofnext year
asking forthe land usedesignation change atthe southwest corner ofLyman Boulevard andHighway101tomixeduseChairmanMcDonaldclosedthisportionofthepublichearingThe
publichearing will continue atthe December4 2007Planning Commission meeting
APPROVAL OF MINUTES Dillonmoved Thomasseconded toapprovethe verbatim
andsummary minutes ofthe Planning Commission meeting dated November6 2007aspresentedAllvotedinfavorandthemotioncarriedunanimouslywithavoteof6to0
COMMISSIONPRESENTATIONS None
Chairman McDonald adjourned the Planning Commission meeting at9 40 p m
SubmittedbyKate Aanenson
Community DevelopmentDirector
PreparedbyNann Opheim
4
41
CHANHASSENPLANNING COMMISSION
REGULARMEETING
NOVEMBER 20 2007
ChairmanMcDonald calledthe meeting toorder at7 00 p m
MEMBERSPRESENT JerryMcDonald Kevin Dillon KathleenThomas Debbie Larson
MarkUndestad and DanKeefe
MEMBERS ABSENT KurtPapke
STAFF PRESENT KateAanenson Community Development Director Bob Generous Senior
Planner andAngie Auseth Planner I
PUBLICHEARINGHARTVARIANCE REQUEST FOR AVARIANCE TO EXCEED THE MAXIMUM
DETACHEDACCESSORY STRUCTURESIZETO CONSTRUCTAN ADDITIONTO
AN EXISTING DETACHED GARAGE ON PROPERTY ZONED RURAL
RESIDENTIAL RR LOCATED AT951 HOMESTEAD LANE APPLICANT JDA
DESIGN ARCHITECTS OWNERS JOHN CINDY HART PLANNING CASE 07 28
Public Present
Name Address
John Cindy Hart 951 Homestead Lane
John Meyering 1050 Homestead Lane
Angie Auseth presented the staff reporton this item
McDonald Okay Mark Do youhave anyquestions
Undestad Justa theybuiltthe home itsays thatthey builtthe detached garage with the intent
toaddon in the future Didtheir initial originalplans showa larger structure atthattime
Auseth Notthat Iam aware
Undestad Okay Andwhen did they bringin the permit
Auseth The permit was brought in on thelast deadline date Orthe variance was brought in atthelastdate
Undestad The variance was
Auseth Correct
42
Planning Commission Meeting November20 2007
Undestad Did theybringin aplat orpermit earlier for the structure itself
Auseth No
Undestad Okay
McDonald Debbie
Larson Iknow Iread itand Iknow youjust saidit When did the rulechange
Auseth InMay of2007
Larson Okay And were was there anywaythat peoplewould have knownthis Imean wasit
in the newspaper orhowdid they know
Auseth We advertise thatthere arezoning or code amendmentsbeingdone Theyre not
specific tothe changes Wedo publish themhowever in the newspaper
Larson Inthe newspaper In theChan Villager Okay
Dillon Sowhenthe ultimateplans that yousuggestedherewere proposedtothe homeowner
whatwas the response
Auseth Their response was they wouldlike tohave their addition thattheyare requesting
Dillon Okay And was thereany was thereseemtobe awillingness tonegotiate atall oris it
this way orno way
Auseth From what Ican tell that this iswhat they requested and this is what they wouldlike to
do
Dillon Okay Thats the onlyquestion Ihad
McDonald Okay Dan
Keefe Noquestions
McDonald Kathleen
Thomas No Thankyou
McDonald Ihave no questions ofstaff either atthis time Wouldthe applicant like tocomeforwardandpresenttheirsidetothiscase
JohnHart Yes Thankyou ImJohnHart Thehomeownerand thank youfor having usin this
evening We havein fact beenplanning this foralong time The originaldrawings donein
2
43
Planning Commission Meeting November20 2007
1987 do not show anything other thanwhat youhave just seen here With lets seeIguess oh
there we are With the existing garage as itis The additionis intended as a wood working shopformeasIapproachretirementThatsthepurposeofthisIunderstoodthatpartofthereason
for the May 2007 restriction or change in restrictions wastopreclude what had become
apparently habitualand people usingsuch largestructures on their property for business
purposes Theresno such intention in this case Itsstrictlya hobbyfor my retirement The
reason thatwechanged down to from 20 feet down8 feet to12 isnot veryattractive tous isthatwhatIdliketodothereisbuildboatsandoneneedsashopatleastaslargeastheboatone
wishes tobuildtomake itpractical If we could onlydo12 feet long frankly I wouldntbother
with it Idontknow what wed do but we wouldntdo it The ideaofconnectingthe existing
garage tothe house therebyrenderingitattached and freeing usfrom all restrictions we could
make itanysize after that iscertainly tosay theleast impractical CanIhave oneofthosepicturestostickuphereImnotsurehowthisallworkssopleaseexcusemeformy
inexperience This isa shot between the from thedriveway betweenthe house on the left and
the garageon the right Toextend the garagesouth tomeet thehouse in anyway wouldmake
the projectoutlandishly expensive Theroof ofthegarage would have tobe completelytrussed
because theresno way tomake itmatch the roofline ofthe house in anypracticalway Thebeginningofthesteepslopetothesouthwouldrequireextensivegradingandasyoucansee
theres adeck down there which wouldbe rendered inaccessible byhaving agarage rightup
against it Soalthough intheory thatsounds like areasonable idea in factitwouldntwork in
anypracticalsense atall for us Further all oftheutilities hitthehouse atthatcorner although
youcantseethem Theyre right around thecorner totheleft That wouldall have tobe movedYoucanseethewellheadthereThatwouldhavetogetmovedaswellrequiringanewwellto
be dug Again the project would be unreasonable and could noteven be approached from a
financial aspect It wasmentioned that there area great manyresidences nearusthathave large
in some cases verylarge external structures Had we 20 years ago almost21 years agonow
decided toinfacthave an attached garage this ofcoursewould be mootbecausewe couldexpandittoanyreasonablesizeoranyunreasonablesizeforthatmatterAsfaraswecanmake
out We chose tohave a detachedgarage thosemanyyears agofor well a variety ofreasons not
least ofwhichwas certain healthconcerns about the presence ofautomobile exhaust chemicals
gasoline and soforth startingthe garage It wasvapors wedidntwant transferred intothehouse
Wethought itwas ahealth issue It isofcourse unfortunate thatwere thefirstones apparentlyapplyingforavarianceinthisrespectThehardshipissueisdweltonconsiderablyinthereport
fromcity staff and its difficulttoquantify except in the sense thatanyother approachto
producing this size very modestshopI might add compared toother wood shops wood working
shops or boat buildingshops anyother approach wouldbe wildlymore expensive usingthe
existing structure and extending itin a directionthat isalmost invisible to neighbors drive byandanybodyelseIstheonlyrealisticwaythatwecanthinkoftoapproachtheissueExtending
ittothesouth as Imentioned would be completely prohibitive and cost really isquite
impractical It willbe noticed Ithink youdistributed responsesthatwe got from all the all but
oneofthe neighbors within 500 feet They all apparently needtobe polled toget their feelings
about this All were positive about it Theonlyone that wasnt and I think itsa matter ofcorporatebureaucracyisBluffCreekGolfCourseacrossPioneerTrailwhowereunwilling to
respondin anyway Positive ornegative Everybody else was positive as youcansee The
photographsthat Ibelieve wedistributed aswell or renderingsfrom our architectshow that the
visual impact ofthisstructure is negligible Itsunderneath a berm It matches the current
3
44
Planning Commission Meeting November20 2007
structure The onlyperson whocaneven seeitis our nextdoor neighbor and all theysee isthe
same appearance thattheysee now except20 feet closer tothem And itsstilla considerabledistancefromtheirresidenceTheeastsideofwhichhasnowindowsSotheyhavetogoout of
their way toeven seeit much less care about it Ivegoneover thehardship issue with respect to
the alternativeapproach tobuilding a structureand asIsay not even consider Ofcourse had
we attached the garage noneofthis wouldhave come up But as Isay wedid Theres nothing
we cando about that now Thereis no intenttodo business asIsaidthere Ihave no interest inthatbutasIgetnearmyretirementtheonethingIdontwanttodoismorebusinessIvedone
thatfor 40 yearsnow Thats quite enough Iguess Ithink thats the end ofmystatement
Unless theres somethingyouwantedtoadd
CindyHart Yes
JohnHart Oh yeah Theother interestingissue isofcourse thatthe Citys as the analysis
indicates nobodyelse hasa detachedgarage Nobodymakes detached garagesanylonger
Therearenone inanyreasonable distance from us Nobodyelse could in anypractical wayask
for asimilar variance because theyall have attached garages They candowhatever they wantwiththemWearetheonlyonesasfarasweknowcertainlywithinaverylargeradiusaround
ourhouse that hasa detachedgarage and therefore falls intothis crack And the intentions ofthe
restrictions Any questionsI cananswer from anyone
McDonald Does anyone have anyquestions for the applicant Ihave a question yousay whatyouwanttodoisbuildboatsIsthisgoingtobeyournewhobbyisboatbuilding
John Hart I hopeso yeah Assuming Iturnout tobe goodatit
McDonald Wouldthe intent be togive theseaway asgifts orwould yousell them
JohnHart To my childrenand I hopetograndchildren asthey begin toarrive
McDonald Okay I have no further questions Iguess atthis point
JohnHart Thanks again for your time
McDonald At this time we willtakecomments from anyone thatwishes tocome up and address
the commissioners Come on up
JohnMeyering Hello ImJohnMeyering One ofthe neighbors ofHarts 500 feetclose to
them and Ijust want tosaythatin all appearance for his sake youcanthardlyseewhere he
wantstoput it Its behinda berm and whatever and but Icant seebecauseI live closeand Ill
be in that situation too because a year ago Iadded on tomyexistinggarage Justput a lean toon
the oneend Added on because Imgetting a retirement motorhome in about a year year and ahalfandIdidntknowwhatsizeinthissoIjustputasmalleronebecauseIhaveamotorhome
nowIwant toput inside So whenthe rules changed just last May I dontthink anybody in
Chanhassen evenseen itinthe paper becauseIread thepaper everyweek Id like toputmy
thing in because all all thepeople thatmoved out there 14 yearsago or lateror sooner wetook
4
45
Planning Commission Meeting November20 2007
the chancethat when webought that land that the zoning was wecouldput up anyoutside
buildings up tosomuch square footage on the land that we wehave all2 1 2 acrelots WerenotsittingintownwithahalfacreorquarteracrelotsSoifyousawthelandscapewereall
really niceout there We have all niceproperties We all landscape ouryards really niceso and
in Harts case theydid avery very goodjob ofputting itdown Trying tolandscape itright in
there and I canseetheir point why theyd just like toput iton the one endand that wouldbe
about the onlyspotthat youcould Sothat was about theonlycomment Ihad is they did a verygoodjobofdoingthatandIthinkitsitshouldbewhereweshouldallgetnoticesonwhenthe
land the ruleschange becausethat hurts everybody thats out there that asof10 14 years agoor
whenIwent outthere 14 yearsago Iwanted toretire and Imkindofretired now and itlooks
like Imnot going toget my retirement home motorhomeunless Iwanttoleave itoutside and
thats kindofhow where Imnot staying in townand but ourkids same thing about his wantstomakeboatsThatskindofdenyinghisretirementWhathewantstodoandthatsallthe
commentsI have Idontwant totake too muchofyour timebut Iagreehe did a very goodjob
ofdoinghispart and Ithink he should get it Thankyou
McDonald Thank you Does anyone else wish tocome forward Well seeing no oneelsewantingtocomeforwardclosethepublicmeetingandwellbringtheissuebackbeforethe
commissioners fordiscussion andKathleen wellstartdown with you
Thomas Okay Its I finditalittle hard asyoucantelljust becauseIunderstand where hes
coming from and the aspectofyouvegot a largeproperty Youvegot ample amount ofsquarefootageItstheonlydetachedgarageintheneighborhoodIfitwasattachedtothehousehe
would be able topunch in another youcouldhave itas anysize youwant to Istruggle with the
factthatwe have the our rules that arechanges for the rulestosay howbiga size a lot garageor
things ofthatcanbe on alotsoImstill tryingtomull this over
McDonald Dan
Keefe Yeah youknow Iguess where Imstrugglingis youknow youknowtoget a variance
youve got toprove a hardship and the question iswhether youknowhardship ishere youknow
The onlything thatkindofenters intomymind is just the possibility thatbecauseitsthe onlydetachedgarageintheareaeverythingelseisattachedWhetherthatmayelevateitselfinthat
area ofhardship Idontknow the answertothatbutthats kindofwhat Imthinking
McDonald Okay Kevin
Dillon Iknow every time we get facedwith oneofthese wealways get like the consistency
question and then we challenge ourselves nowarewe being applyingall these things
consistentlyornot and its hard becauseeverything theres alwaysthe subtle differences toeach
situation Inthis case Imean Isaw thepictures that camearound in thepackaging Theguythat
made themwas a masterofphoto shoppingthings or but itjust doesntlooklike theresgoingtobeanyrealdetrimenttoImeanlikeaneyesoreofanysortItsyouknowtherulesthezoning
things changedrecently Im inclined toyouknowapprovethe variance because Ijust think that
we just kindofthe timing and the confluenceof factorshere this oneyouknow shouldbe one
thatwe would be okay with
5
46
Planning Commission Meeting November20 2007
McDonald Okay Debbie
Larson Well Iwas kindofwith Kevin on thatonetoo Imlooking atthe neighbors and theyve
all got their auxiliary structures and youknowtheyve al saiditsnot a problem Idontsee
where its going tolookanydifferent Ithink its odd thatwehave 1 000foot ordinance on
properties ofthis size Iminclined to gowith the variance approving as well
McDonald Okay Mark
Undestad Yeah Iguess Imwith Kevin and Debherethat youknowagain ImeanI kindof
understand when they bought these lots years agothey bought these size oflots with theunderstandingthatwecanputourshedsourshopsorequipmentyouknowImeanthey can do
that with thesesize lots Iknow attimes asthesecome out in thenewspaper and people dont
always seewhat they arebut tofindout the hard way youknow again Ithink that the
motorhome parking in there Imean hes going tocomeup hereand want a place topark his
motorhomeand Ithink whenhe boughtthe land back there itwas probably hisintention thatsomedayImgoingtohavemystuffonhereandkeepittuckedinandshelteredYouknowif
theywere smaller lotsand we werepushing the envelope on hard surfaces and all that Imight
lookatita little differentbut Ithink Iunderstand why they bought the lots they bought out there
and looking atthe utilities and the water the well and youknowtheresreally just no other way
toputthat on for them so IguessId be inclined toapproveitalso
McDonald Okay I guessthe firstthing just becauseofmy legalbackground anytime you
start talking about somethingwhere youknow the city didntdo something Ifeelasthough I
shouldcorrect you The city followed law in thefactthatall that theyre required todo is puta
notice in the paper totell everyonethatthelaw is changed Its yourresponsibility tokeep upwiththelawHavingsaidthatthoughtheresapartinhereonthethingabouthardshipthatIm
really struggling with because ofpastvariances Iknow thatwevepassed It says the intentof
this provision is nottoallow aproliferation ofvariancesbut torecognize thatthere arepre
existingstandards in the neighborhood That getsusback to asIgo back tothis chartand I
begin tolookatthe detachedstructures that are there and Imhoping tofindthatthere isaparallelityofstructuresover1000feetandofcourseits44ButasIsaidIdorecallhaving
gonethrough this in someolderneighborhoods where things have changed and wehave tried to
accommodatekindofneighborhood standards Sothats whatImkindofwrestling with because
atthis point and againwith thepetitions thathave been putin here and everybodysigning itand
looking atthe drawings as towhat itis Ihave a hard timesaying no also but Iguess thatskindofwhereImatonallthisisthatIthinkmaybetheyvegotacaseunderthehardshiptosaythat
there are pre existing standards and again togobackwith the history ofall this and what
everybodys been doing Andagain not sayinganything aboutwhen theordinance changed you
know that wasan opportunity for people tocome in and speak againstitbut Iunderstand how
things areand againthis iswhat this paragraph does It allowsyouan opportunity kindofasecondchanceIthinkSohavingsaidthatIllthrowitopentoanycommissionersthatwant to
put forth a motion
Larson Aquestion ordoI have toread itthis way
6
47
Planning Commission Meeting November20 2007
McDonald Well youshould read ittheway itis and then ifyouwant tolookatmakingchangesoryoucanproposeadifferentmotion
Larson Ican
Aanenson Yes youcanmodify the motion and Iwould certainly recommend that youmodifyyourfindingstomatchyourmotion
Larson Modify findings Right okay First ofall Iwill makeamotion thatthe Planning
Commission approvePlanning Case 07 28 for a 177 square foot variancefrom the maximum
1 000square footdetached accessorystructure for an additiontothe detached garage onLot 2Block3PioneerHillsAdditionbasedonthefindingsoffactinthestaffreportAndthenalso
amend the finding inPart Awhere itsaysliteral enforcement oftheordinance does create a
hardshipofthe useable of theirreasonable useofthe property in thathe would incur a verylarge
amount ofexpensesin order todoitthe way thecity wants Is thatokay
McDonald Ithink ifyoure going todo that go back up totheparagraph that Iread and said
thatbased upon where wereatwith the righthere What itis thatthere arepre existing
conditions in the neighborhood
Larson This one
McDonald Yeah ifyouregoingtoamendthefindings whatwe needtosayis thatthere are
preexisting conditions within the
Dillon Findings arefindings Lets justdeal with the
Aanenson You are approving recommending Findings ofFact The FindingsofFact should
supportyour motion Whether youwant togo back and say thefactthatthis is theonlydetached
garage which is a reasonable finding because youcanhave otherapplications thatyouwant to
tie itback to Sothat wouldbe one And thencertainly in their recommendationthatCommissionerMcDonaldhadwouldbeanotherappropriatefindingbecauseyouneedtomatch
your motion
McDonald Right youneedtomatch the motionsup and sheschanged the recommendationand
the nextthing Illdois ask ifanybody wants todothe recommendation thatstaffdid and wellvoteonitfromthere
Larson Okay Sodo Ihave todo anymore
McDonald Okay have we read inthe record whatwe want asfar as thefinding wouldbe thatbecausethattherearepreexistingstandardswithintheneighborhoodthishomewouldbe
Larson Okay wewant itamended toshow thatthe findings amend the findingstoshow that
there are pre existing standards in this neighborhood
7
48
Planning Commission Meeting November20 2007
McDonald Ofthe detachedstructure which exceeds1 000 squarefeet
Larson Which exceed 1 000 square feet Okay With thatasecond okay
McDonald Now does anyone else wish tomakearecommendation Does anyone wish topush
forward the citys recommendation Staffsrecommendation Okay then we willvote onDebbiesrecommendation
Larson moved Undestad seconded thatthe Planning Commission approvePlanning Case
07 28 for a 177square foot variance from the maximum 1 000squarefootdetached
accessory structurefor an addition toa detached garage on Lot 2 Block3 Pioneer HillsAdditionbasedontheamendedfindingsoffactstatingtherearepreexistingstandardsin
the neighborhood ofdetached structures whichexceed 1 000 square feet All voted in
favor exceptKeefe whoopposed and the motion carriedwitha vote of5 to1
McDonald Okay soit passes5 1 Okay and Itake itthat this will probably go up before CityCouncil
Aanenson No itwontunless somebodyappeals it
Generous Unlessits appealedwithin 4 days
McDonald Okay Ifyouguys want toappeal Sothe motionis approved The variance is
granted
JohnHart Thankyou
PUBLICHEARING
ROSEMOUNT REQUESTFOR INTERIM USE PERMITTO ALLOW A
TEMPORARY ANTENNA ONTOP OF ABUILDING LOCATED AT8200MARKET
BOULEVARD APPLICANT ROSEMOUNT INC PLANNINGCASE 07 25
Angie Auseth presented the staff reporton this item
McDonald Kathleen
Thomas Idonthave anyquestions thanks
Keefe What happens attheend of6 months Dothey apply for another
Auseth Theycanformallyrequest toexpand
Keefe Expand it or requirethem totake itdown or howdoes that
8
49
Planning Commission Meeting November20 2007
Aanenson Thats correct It hasa termination date and thenifthey can request an extension of
youcandeny the extension and theyd have totakeitdown
Keefe Soin either case ifthey
Aanenson Correct Correct
McDonald Kevin
Dillon You know the onlyquestion Ihad is answered bythe letterfrom the distinguished
technologist
McDonald Okay Debbie
Larson Ithink its coveredeverything
McDonald Mark
Undestad No Good
McDonald Okay I have just onequestion Imnot sure ifyouanswered itornot Idont think
Isaw itin thereport After what we went throughwith thecell phone tower hasanybodylookedtoseeifthereareanyfederalrequirementsthataregoingtohavetobegonethrough in
this
Auseth We have donethat Weve contactedthe MinnesotaState Historical Society At this
point therearentanyhistorical impacts
McDonald Not somuch historical Do we get inwith like theFCCoranybody else that
governstransmissions within the air
Auseth That was addressed with the email that waspassed around and the applicant can answermoretothat
McDonald Iapologize for notreading myemails Thank you Ihave no further questions Is
there an applicant heretopresent the case beforeus
KellyOrth Hello Myname is Kelly Orth Iwork for Rosemount Incorporated Imthe one
thatfillsout theapplication and setting up this testnetwork Thisis a product linethat weve
developed and were trying tocreatea wireless sensor network The sensors area varietyof
sensors Pressure temperature level orslow andthe idea with the wireless networkis thatthey
canform a meshnetwork sothat all these battery powered sensors ifthey cantcommunicate toabasestationinatypicalsystemapointtopointsystemorbasestationofftoeachdeviceSo
iftheycantcommunicatetothe base station they cancommunicate totheir neighbors Form a
mesh network and themessages can hopfrom unittounittoget back towhere itneedstodo So
weveintroduced theseproducts and the systems in the marketplace and theyhave limited range
9
50
Planning Commission Meeting November20 2007
right now 300 to500 feet sowhat were inthe process ofadding some higher beam antennas
and elevating the antennasatthe 25 footpoint aswe mentioned just toextend theirrangePossibleapplicationsareinoilandgasexplorationwherewellsarelocatedaroundondifferent
sites City widewaterand wastesystems as Chanhassen might have where youmight wantto
monitor your pumping stations and your lift stations And byusing wirelesssystems like this
the costsare much lower becausetheres no electrical hook up Theres no internethook up Its
alldone wireless Sowere in theprocess ofdoing thetesting as Angie mentioned Shes beenveryhelpfulinformulatingtheproposalandbythewayIdliketotaketimetothanktheCityof
Chanhassenand the various people withinthe city for allowing ustoallow some ofthe citys
facilities Specifically Todd Hoffman the city ParkandRec Director andmost recentlyPaul
Oehme the Public Workssowe canspreadout Obviouslywe dontownproperty withina mile
radius ofourplant We have torelyon our goodneighbors toallow ustousetheir facilitiesAndweintendweintendedallalongjusttomakethistemporaryItsnotmeanttobea
permanent system Itsjust fortest purposes Whenever youtell ustotake itdown youknow
welltakeitdown Its not a bigdeal Weve donesome preliminary testing with the72 hour
clause sowe putour antennaon the roof up for 72 hoursand take itdownlater andthen comeup
with adifferentscheme tofigure out howthis stuffreally works becauseits kindofblackmagicandtestsomemoreSowerelearningbutwhatwereallywanttodoisputitupandgetsome
long term reliability capability ofthe testnetwork We wereup last night during the fog and we
learned thatitworks just finein 1 mile visibility sothats the kindofthing thatwe want tobe up
for right now Change ofseason Different weather conditionsand different circumstances so
again its just atemporary facility We have no intention in makingitpermanent
McDonald Okay questions Mark
Undestad Yeah just a couple Onthe frequency syoure using on there are thesame used in
like WiFi things likethat
KellyOrth Yeah
Undestad What kindofrange isyour antenna going tohave on there
Kelly Orth The frequency we useis a2 4 gigahertzbandwhich is apublic set aside band for
WiFiand BlueTube and theseZigby networks Maybe youve heard ofZigbyand sowe usethe
same radios asZigby radionetwork would use Theyreregulatedbythe FCC It hastomeet all
the prettysignificantrequirements Allthe power transmissionlevel requirements But thenice
thing about theISM band the2 4 gigahertz band that itdoes notrequire a site license If youhavethelicenseeveryparticularsiteeverybodythathasaWiFiinternetsystemintheirhome
would have toget an FCC licenseand itwouldmake itpretty hardtodo
Undestad Is there anychanceofanyinterferenceswith neighbors orWiFi
KellyOrth The extent ofco existenttesting and interference testing we usea different radio
technologyeven though its in the samefrequency band Itactually does frequency hoppingsoit
shiftsaround and uses different parts ofthe bandatdifferenttimes
10
51
Planning Commission Meeting November20 2007
Undestad Soyoudontprogram inyour frequency and itpicksup orinterferes with
Kelly Orth No wevetested itwhere aWiFiinternet system and ourZigby type radio network
system arewithin youknow halfameter apartand theres no interference
Undestad And theantenna youhad out inthe yard out there for a while what wasthat one
That was just another testdealout there
KellyOrth Ivegot somesamples ifI could
McDonald Okay yes
Kelly Orth This isournormal unitwith an integral antenna and this isa temperaturetransmitter
thatwill help todothe display and cover goes on this side Thebattery goes inthis side soits
all battery powered It doesnthookup toelectricity oranything and this isa highVantenna for
the Vantenna And what were going with ourwireless testing thisis putting a remote
connectionon the device and then wereusing ahigh beamremote antenna with acoax cablebetweenthemandasyouknowonradiowavesifyougetitupintheairyougetbetter
reception Sobasicallythis is whatweretrying totestin conjunction Withour standardunits
sprinkled around toform thesedevices Sothe application istobe able toput one ofthese
antennas on a 25 foot pole 25 foottothe tipas Angie had pointed out and we wouldleave itup
SoIthink we promisedtoget itdown byMemorial Daysothat weget all this stuff out beforetheschoolsout
Undestad And thisis goingtogo on the southside ofyour buildingsomewhere
Kelly Orth Yeah Itgoes up on theroof becauseits higher there You know were kindoflowoverbythelaketheresotogetupovertheotherbuildingsaroundusandsomeofthe
neighboring elevations
Undestad Howbig is yourbuilding thereagain
Kelly Orth Well weownabout 54 acres Thebuilding wereputting iton the twostory office
building Idonteven know howbig thatis
Aanenson That alone is60 000 so
Undestad Soyour 20 foot antenna isgoing tobe just backthere somewhere
Kelly Orth Yeah Its kindofhard to seeunless youreally know where tolookfor it
Larson Sothe intention is really just to have this on your property and nowhere else
Kelly Orth No These units are alreadyinstalled insome ofthe parks Ifyounoticed theres
oneof theseunits right on City Center Park Field 1
11
52
Planning Commission Meeting November20 2007
Larson Imgetting thatBigBrother feel
Kelly Orth No no Its just they talkin 4 millisecond bursts and they senda little datapacket
over the air tothe other device Itsjust a little data packet which tells what thename ofthe unit
istotestthat
Larson Its datayourecollecting Imlooking for theseunits all over the place
Kelly Orth Justhowreliable How manydata packetsare sent and howmany are received so
werejust testingthe wirelesscapability Sowe canmonitorover the air we canmonitorthe
path stabilityofeach point The ones right heretalks tothe roof top unitwhen we putour
antenna up
Larson Whatsthe major purposeofthe whole idea
KellyOrth When youmesh networks in thesesensors
Larson Yeah
Kelly Orth Justtolower theinstall cost tobe able tomonitor pumps and motorsand valvesand
be able todo data acquisition ofthese extensive infrastructuresystems You know theres a lot
ofmoney invested in all this equipment and ifitstarts tobreak down bad stuff canhappen
Larson Soareyoutalking this with this companyorareyoutalking city wide Imean like just
topull someweird obscureexample out Weread meters on houses for gas
Kelly Orth Yeah there could be devices We dontmakemeter reader gas meterreaders butZigbytypedevicesareouttherethatyoucanputinameshnetworkandreadmetersoncea
month
Larson basicallythats allI have
McDonald Kevin anyquestions
Dillon No questions
Kelly Orth Iwant tothankyoufor your time and Ihopeyouapproveand Ireally want tothanktheCityofChanhassen
McDonald Beforeyougo just a second Kathleen youhave anyquestions
Thomas Idonthaveanyquestions Iactually finditvery interesting thank you
McDonald TheCity isrecommending onlya 6 monthwindow Is thatgoing towork
12
53
Planning Commission Meeting November20 2007
KellyOrth Yeah thatwillwork fine Yeah Iwanted tobeout there in thechange ofseasons
and weve been able togather enough data nowwith our72 hour windowshere and there that wefeelthatthisisaviablewaytodoitandoverthecourseofafewmonthsherewewanttogather
alotofreliability thatthe devices aregoingtostayonline no matter whatbecause reliability is
paramount inour industry
McDonald Okay I have no furtherquestions then Thank youfor addressingus At this pointIwillyouknowthrowthemeetingopentothepublicAnyonewishingtomakecomment
please comeup tothe podiumand address the commissioners Seeingno one comeforward
wellclose the publicmeeting and wellbringitback up before the commissionfor comments
andKathleen
Thomas Idonthave anyissueatall Ithink its agreat ideaand itsavery goodthing soImfor
it
Keefe No issues
McDonald Kevin
Dillon No issues
McDonald Kathleen
Larson Me
McDonald Debbie Kathleens down there Debbie
Larson She was herelast time
McDonald Thats why youkeep changing peopleon meand Imsure theyre doing thaton
purpose
Larson Yeah
McDonald Ihave no problems either At thatpoint wellopenitup tothecommissioners for
someonetoput arecommendation forward
Keefe Illmake a motion the Planning Commission recommends approvalofPlanning Case 07
25 for an Interim UsePermit toinstall a 25 footmast antenna on topofa twostory officendbuildinginRosemountlocatedonLot1Block1ChanhassenLakeSusanPark2Additionas
shown on plans datedreceived November2 2007 based on the FindingsofFact in the staff
report and subject toconditions 1 through 3
McDonald CanIhave a second
Dillon Second
13
54
Planning Commission Meeting November20 2007
Keefe moved Dillon secondedthatthe PlanningCommission recommends approval ofPlanningCase0725foranInterimUsePermittoinstalla25footmastantennaatopthe
two storyoffice buildingatRosemount Inc located onLot 1 Block1 ChanhassenLakesndBusinessPark2AdditionasshowninplansdatedreceivedNovember22007basedon
the FindingsofFact in the staff reportandsubject tothe followingconditions
1 Abuildingpermit must be approved priortoinstallation ofthe mast antenna
2 The interimuse permitis valid for a period ofsix 6 months from the dateofbuilding
permit approval Should the interimuse permit need tobe extended theapplicant will
needtorequest a formal extension 60 daysprior tothe expirationdate ofthe permit
3 Approval ofthis applicationis contingent uponCity Council approval ofthe zoning
ordinance amendment toSection 20 1515 Antennasmountedon roofs walls and
existing towers requiring an Interim UsePermit IUP for antennas inexcess of15 feetin
height
All voted in favorandthe motion carriedunanimouslywitha vote of6 to0
PUBLICHEARING
ORDINANCE AMENDMENT CHAPTER 20 ZONING
Angie Auseth presented the staff reporton this item
McDonald Kathleen questions for staff
Thomas Idontthink I have anyatthis moment
Keefe Quick question just inregards toyouknowyour secondpoint itjust says youknow must
be constructed ofmaterial or color which matches the exterior ofthe building orstructure Is
that recommended as opposed tosay thenatural sky color or surrounding landscape orsomethingalongthoselines
Auseth Yes and thatscurrently in the city code Sothatitblends in with thesite and isntan
eyesore
Keefe I almostprefer thatlanguage thanwhats in here That itsort ofblendsin with the
surroundings versus sortofmatches the exteriorcolor ofthe buildingbecause perhapsits up
against abunch ofpine trees and itsjust painted green
McDonald Kevin
Dillon Sowetalk about theheight Is there anythingin here thataddressesthe diameter ofthe
antenna orthe guidewires oranything like thatthatneedtohold itin place Imean isthat
should thatbe included Do wecare
14
55
Planning Commission Meeting November20 2007
Auseth Okay Section 20 1509 towers and antennas design It saysthe towers antennasincludingsupportingcablesandstructuresshallbedesignedtoblendintothesurrounding
environmentthrough the useofcolor ofcamouflaging and architectural treatments
Dillon Okay
McDonald Does thataddress the concern
Dillon Yes thats fine
McDonald Any more questions
Dillon No questions
McDonald No No Ihave no questions either At this pointI guessthis isopenfor public
Aanenson Thatscorrect
McDonald Public comment soanyone wishing tocome up and comment on this matter please
come tothe podium State yourname and addressand address yourcomments tothe
commission Seeing no onecome forward Illclose the public meeting and Illbringitback upbeforethecommissionersfordiscussionAnycommentsNoOkaythenwellopenupthe
floor for a recommendation for amotion
Dillon The Chanhassen PlanningCommission recommends thatthe City Council adoptthe
attachedordinance amending Chapter 20 ofthe ChanhassenCity Code
McDonald Second Okay
Keefe Can Imakeafriendly amendment Justtoscratch the in number 2 in thematerial or
color which matches blah blah blah It really tomake itsync up with what isin the IthinkArticle30ofChapter20Article30Chapter20
McDonald Kevin youmade the amendment Wouldyouaccept the friendly
Dillon Yeah and tousethe languagethats consistentthat we just heardtoblendin with thesurroundingenvironment
McDonald Andthats what youwouldlike
Keefe Yes
McDonald Okay
Dillon Sowerecommend todothatwith thatproviso
15
56
Planning Commission Meeting November20 2007
McDonald If youaccept the friendly amendment and thatswhat therecommendation nowbecomesOkayOkayOkayanyotheramendments
Dillon moved Larson seconded thatthe Planning Commissionrecommends that the City
Council adoptthe attached ordinance amending Chapter 20 ofthe ChanhassenCity Code
with a change tothe language in item 2 under Sec 20 1515 tosay thatthematerial orcolormatchesthesurroundingenvironmentAllvotedinfavorandthemotioncarried
unanimously with a vote of6 to0
PUBLICHEARING
COMPREHENSIVE PLAN CHAPTER2 LAND USEELEMENT
Public Present
Name Address
MikeWardle 12601 W Explorer Drive 200
Boise ID 83713
ScottRaeber 12601 W Explorer Drive 200
Boise ID 83713
Ben Gowan 6440Hazeltine BoulevardTomWorkman181SouthShoreCourt
DonHalla 6601 Mohawk Trail Edina
MaryJane White 670 Creekwood
RickDorsey 1551Lyman Boulevard
JeffFox 5270 HowardsPoint RoadVernelleClayton422SantaFeCircle
DavePatchin 17370 Lookout DrivethSeanCullen1980028AvenueNo Plymouth
Jim Boyum 8805 Sunset TrailthWaynePeterson744464StreetWestDaleHance6480OrioleAvenue
BillZiegler 6441OrioleAvenuethMichelleMCurtis2446West64Street
McDonald Thenext item up is we willnowget intoadiscussion on thecomprehensive planThisisChapter2Weregoingtobelookingatlandusethelanduseelementwhichisgoingto
be zoning and howwere goingtolook atourland in thefuture With that Illturnitover tothKatebutbeforeIdoIdowanttoreiteratethatonthe4ofDecemberwewillcontinue
discussion on this issue soifwe donot get toeveryonescomments orifanyone feels afterthlisteningtothistheywanttocomebackonDecemberthe4wewillreadjournandthemeetingwillcontinuetobeopenandwewilldiscussthisissuesoeveryonewillbeheardWiththat
Kate
16
57
Planning Commission Meeting November20 2007
Aanenson Thank youChair membersofthe PlanningCommission The comprehensive plan
landuse elementis the culmination ofall the other elements thatwe discussed over thelastcouplemonthsWedidnthavethismanypeopletohearthesewerandwaterelementso
obviously all ofthose elements thatwe talked about whether its housing parkand rec all relate
intothe land useand youcan seehowthat ties together Sowiththat I want togive an overview
briefly kindofwhere wevebeen Wevereally been workingon this we started this in work
session with the Planning Commission almosta yearand ahalfago Id like toquickly give asummaryofwhatwevedonetodateandhowweendeduphereandagainoutlinefortherestof
the grouphere tonight and thosewatchingathome where we intendtogowith this process
We started out inthe comprehensive plan is weactually looked atan opportunity that was made
people looking attheopportunities with the new212 kindoftheimpetus ofthe infrastructure
and re evaluating ourland uses and atthattime the city in conjunctionwith theChamber ofCommerceactuallyworkedwithJimMcCombstodoacommercialstudyandIllspendalittle
bitmore time goingthrough whattheir recommendations were butthatwasdone in 2006 We
have the information from the McCombsstudy and all itwas was informationand sowe decided
what are wegoingtodo with that information How arewegoingtoimplement that or translate
thatintoourcomprehensive plan sowe workedwith the SRF Group and againIllspend a littlebitmoretimeonthatbutthatwasanotherimpetustogiveussomeinformationofthedirection
weregoing with thecomprehensive plan We had aseries ofopen housesin June thatwere well
attended Two nightsand I knowseveral oftheplanning commissioners wereable toattend
some ofthose meetings The draftofthe comprehensive plan ithasbeenavailable on the citys
website so thats a niceopportunity for our residents togeton lineand readwhatever elementstheyreinterestedinTheywouldneedtocontactstaffWevealsoprovidednumerousarticles
in the Maple Leafand theChan Connection last year That itscoming Open house
opportunities Ways toprovideinformation tobe informed Theresbeen a lotof
communication on that Backin October firstwe actually put the comprehensive plan out for
jurisdictional review What thatmeans is all ofourneighboringcities and the othergovernmentalagenciesthathasanimpactonithasanopportunitytoreviewthatand thatstcommentperiodactuallygoestilApril1butthatisoutandwehavereceivedsomefeedback
from other agencies already Based on theinput that wehad from the sewerand water there was
some concern about theMUSA Theurban service area and phasing that We did hold anotherthneighborhoodmeetinginNovemberonthe6andactuallyabout250noticesweresentoutonthatandwedidlookatkindoftheBluffCreekareaandthepotentialfortheregionalmallarea
because we did changeup the MUSA other urban service areasand Illtalka little bitabout that
in more detail And thenalso wereally wentabove and beyond whats required bylaw and
noticedboth areas thatwere providing some additional zoning to Thingsthat werere visited or
up guidingand those aresome ofthe people heretonight thatwe did notice AgainwewentbeyondthelegalrequirementandwantedtogivepeopleanopportunityThenIwanttotalk
about tonight is togothrough those land usesspecifically ourresidential commercialland
While werefocusing aloton commercialhere tonight the comprehensive planincludes all land
uses and its relation tothe cityand ourgoal isto providea well plannedcity Theresponsibility
tothe city asa wellplanned community so Illspend some time talking about that As Imentionedoneoftheothercomponentsishowweprovideforthegrowthofthecitythrough
urban services providing municipal sewer and water which iscertainly ofinterestofpeople in
the southern area ofthecity Then were going tospend sometimegoing through the
recommendations for the land useplan and Bob Generous on ourstaff willbe goingthrough
17
58
Planning Commission Meeting November20 2007
those Ijust want toremind youthat wevegot a lotofland usechanges Some ofthemare city
initiated Some ofthemare not and youre going tohave applicants requesting WhatweretryingtodotonightistobreakthoseinkindofasequentialmannerSomeofthosehavebeen
noticed for this meeting tonight and thensomewill be scheduled in 2 weeks from tonight sowe
tried tobreakitup sopeople have plenty ofopportunity tocomment Someoftheland use
recommendations thatwe haventsupported youllhave residents that are or applicants that
want totalk aboutthat too sowe want toprovide thatopportunity Commissioners Id just askthatyouknowwetrytofollowtheorderthatandletthosepeoplespeakfirsttonightandthen
atthe end whenwe have time toletother peoplepresent and maketheirpresentations because
wevenoticed certain ones tonight and we certainly want togive thosepeople firstopportunity
and youllseewhere the natural break comes whenwe get tothat section Again Ijustwant tostremindeverybodythatthecommentperiodsopentilApril1andthegoalhereiswhenwethcomebackinJanuaryonthe15wellgiveyouasummaryofwhatyouvegivenustodate
Werealsolooking for direction from thePlanning Commission tonight If youwantustocome
backwith additional information ofanyissuesthathave risen tonight Weve alsobeen
compiling your commentsregardinghistoric preservation and some ofthe issues thatwe
discussed wellbe formulatingthose soyoucangive your recommendation on thecomprehensiveplanatyourJanuarymeetingtotheCityCouncilAgainthenholdsome
additional work sessionsand formalizea recommendations tothe MetCouncil whichwill bestdoneaftertheApril1closingAnyquestionsbeforetheprocess
McDonald Ibelievenot Carry on
Aanenson Okay Then wellgostraight ahead here Thischart here shows acomparison
between where we werein 2030and where we aretoday AgainasIidentifiedearlier the goal
ofthe cityis toreally create a mixture ofland uses thatprovides the high qualityoflife and a
reliabletax base sowe lookatthe office commercial and the residential spreadin this area ThegoalherealsoistoprovideasweworkwiththeMetropolitanCouncilandmultiplelanduses
ourgoal hereis toalso provide thoseareasthat arentdevelopable sowevegotten more
sophisticated inour sowevegot better informationon that So point ofourtotal acreage the
14 760 thats ourbase knowledge Fromthat wetry toback out whatsundevelopable Soyou
cansee from 2020to2030 weveactually increasedthatnumber based on the 12 lakes we haveinthecitythe356wetlandsBackingoutsomeofthefloodplainareasthecreekssothatgives
us atrue number ofwhere thosearebecausethe numbers thatwe have for the office industrial
andresidential worksfor the MetCouncil what we provide They work with ustoprovide the
job projections employmentbase householdsand population base soitsimportant thatwe get
thosenumbers astrue aspossible Solooking attheland usecomparisons youcansee based ontherecommendationsandwellshowyouwhereweregoingwiththatweveincreasedthe
amount ofcommercialacreage by 2 from where wewere And welltalka little bitmore detail
on the commercial study in aminute but thats thebiggest change Wevereduced the office
industrial and increased the more pure office The rest ofyoucan seewere actually decreasing
the percentage and alotofthats just getting better information ofwhats buildableand whatsnotbuildableAnyquestionsonthatThischartisonyourcomprehensiveplantooAlotof
whatImtaking here isout ofthe comprehensive plan WhatIve been trying todois spenda
little bitmoretime explaining what wehave in there SonowIllsegway intothe McCombs
Group where we hired them back and actually we startedthat project wecompleteditin June
18
59
Planning Commission Meeting November20 2007
but itstartedin the firstofthe year and again with the 212werecognize theressome
opportunities there in developingalong the corridor toreassess what was happeningthere andwhattheMcCombsstudyfoundwasthatwehaveaverysuccessfuldowntownandtheressome
additional opportunity for retail based on our highincome and the growth ofresidential
Obviously theres linkage between householdgrowth trade area and the access alongthat so
what the studypointed outis that theresan opportunity toprovide a larger trade area Inthe
comprehensive plan ourgoalthereisto saywewill provideshoppingfor orbe a conveniencecommercialneighborhoodcommercialWeneverintendedtobearegionaldrawsothisisabig
paradigmshift Soits been veryappropriate for usaswelookthroughthe opportunity to
consider the zoning and not do itinjust a zoning application but we ask that becausewe do
have parties that are interested in this is that we ask thatwe waitand study itaspart ofthe entire
comprehensive plan and not lookatthis ina vacuum with oneapplication and looking atspecificbecausereallyitsacommunityprocessandsowelookedatwherethetradeareawouldbesoif
youlookatthe smallest ringin there thatwouldbe kindofwhat we consider ourconvenience
trade and historically thatshowweviewed ourselves We never wantedtobe a regionaldraw
ifyoulookatthe goals in the comprehensive plan Thats what thatstates Soif youlookatkind
ofwhat the downtowntrade area thatskindofthat nextcircle and thats pretty much builtoutThedowntowntradeareaifyoulookattheacreagethatwehaveavailablenowAndthelarger
circle then would be ifthe city was todevelopa lifestyle orregional mall type concept what
would thattrade area be in bringing thepeople intodowntown Sothat the city did start
thinkingaboutwhat wouldbe theopportunities with that Soone oftheother things thatsvery
important for youtokeep inmind ifyougo back tothat slide Ishowed before on the retailacreagewhatitshowsisthattheresactuallya116whatwerecommendedis116acresof
additionalretail and ifyoulookatwhatthe McCombs study did is looking atretail demand they
recommended 112acresofadditional to144 Wererecommendingin this current
comprehensive plan 116 sothats on the low end ifyoulook atwhat the demand would be
Again thats tying back the bigger trade area butalsothe household projection within that tradeareaSowhatwererecommendingisontheconservativeofthelowerendofthatSonow
wevegot the recommendation from the McComb Group Weve spent sometime working with
SRF and I knowthattheymet with the Planning Commissionand the City Counciland youfolks
were involved inthat Butwhat they did islooked atthestudy and intothe futurewhat does that
mean What werethe strengths and weaknesses Certainly oneofthe biggestissues thatwasdiscussedasfarastheregionalcenterwhatwouldthatdotodowntownbecausethatsreally
beenthe jewel thatthe city hasis thatwevehad a downtown Awalkable downtown thatsvery
convenientand we wantedtomake sure thatin doing adding additional commercialzoning
wouldntdeter fromthat sothat was part ofthe focusgroups that was that they talkedto SRF
and then working with the PlanningCommission and the City Council developed anewopportunityforcommercialandthecategorieswhichIllgothrough
Keefe Did we get asortofaconclusion from them
Aanenson Yes this is its amap format right SoIllgo throughthatindetail here and IvegoneoverthedefinitionsinhereTheyrealsointhecomprehensiveplanandwhiletheyre
wordyon thisslide Ijust wantedtobe able togo through those briefly But the central business
district which isshowing up on the map astheAarea within thatwere recommendingthe two
zoningdistricts The central businessdistrict and the highway business We have a number of
19
60
Planning Commission Meeting November20 2007
zoning districts that are they overlap and were going totry tomake thatmoreconcise under the
oneofourbig projects thenafter the firstofthe yearwould be then tore write thecomprehensiveplanlookingattheappropriatezoningWestillwanttokeepsome business
highway in thecore ofdowntown which providessome ofthose auto related typeuses and also
the commercial Ialso want tostate that there isnta lotofvacant thereslimited vacant
commercial land in the downtown core whichis oneofthe reasons thatweendedup with this
model Sowhat is the downtowncore Thedowntown core iswhere youhave the groceriesThisisreallyourtrueconvenienceareaWevegotthegrocerystoresWevegotthepostoffice
Weve got thelibrary These are the areas where wedo a lotofthat dailyactivitythat youwould
maybe bump intoyour neighbors thatsortofthing soweve we have againlimited potential
Whenwedid Villageson the Pond that was controversial atthe timebecause we went across the
highway It was very controversial butreally nowthinking back its kindofthis continuedlinkageofthedowntowncoreprovidingthatverticalhorizontalmixwhichatthetimewe were
out there kindofthe firstones topursue that well over 10 years agoso and that was considered
part ofthedowntown but that againprovidesthat additional opportunityfor some ofthat kindof
that neighborhood convenience Sowith that we looked atthe nextzoning district which would
be the regionalcenter and what wouldbe thedifference betweenthe regional centerand thedowntowncoreWouldtheybecompetingwitheachotherandwespentalotoftimeinthe
focus groups talking about whatwould be the difference and themajor differences wouldbe
comparison shopping There wouldntbe the grocery storethings Yes thered be some
entertainment and some housing whichyoualso have in the downtown The downtown core has
housing It hasshopping It hassomeother convenience stuff Some ofthat wouldbe intheregionalcenterSomeentertainmentSomerestaurantswhichyoualsohavedowntownbutthe
biggest difference is the compare shopping which youdon thave asmuchofin the downtown
core and when Isay comparison shopping thats an opportunity ifyoure looking for a suit togo
to2 or 3 differentplaces totry tofindthat soits a bigger trade area Doesnthave the same
convenience as thegrocery stores thelibrary those sortofthings soits kindofapublic whatwecalltheneighborhoodusesthatyouwanttocongregateinsothatwouldbethedifference
between thetwo
Keefe Is itpart ofthe recommendationto limitthe uses in the regional mall
Aanenson Correct
Keefe Sothattheywouldntnecessarily cannibalize the downtown
Aanenson Correct yeah Thankyoufor pointing thatout One ofthe things there as ImentionedearlierthatwillbecomingbacktoyouwiththezoningdistrictWehavent
developed thatyet Werewaiting toseewhere youre going with this but that would be the
recommendation is toactually developthatzoning district aswe would with all the commercial
zoning districts tore write thoseso they wouldntbe similar
Keefe Justonefollow up question
Aanenson Sure
20
61
Planning Commission Meeting November20 2007
Keefe On your maphere theres the purple area Ithink itspurple When youshowthe purple
tothe westofdowntown youvegot theblack highlighted areas Is thattwo magenta or what isthecolortothewestthatgoesoverPowersand
Aanenson Yeah Those areneighborhood Illtalk about thoseina second Yeah Sowe
talked about thetwo biggest ones would be the downtowncore and then the regionalmall Then
the other ones would be community commercial and thatstosee and wedid spend sometimetalkingaboutyouknowwhatdowedotomakesurethatwevegotkindofanequalplayingfield
in thedowntown Wevegot limited acreageleft inthe core ofdowntown sowhat wouldwe do
tokindofcreate thatsynergy tokeeppeople that want todo someofthat convenience in
downtown Soone ofthe discussions was actually lookatsome ofthe buildings that are
currently inthatarea Theres somevacant parcels Theres someoffice industrial thatwewouldconvertthattokindofabigboxandagainwevegivensomebroaddefinitionstowhatthat
would be That that wouldbe furtherarticulatedwhen we actuallyupdate thecomprehensive I
meanthe zoning ordinance sowelllookatthatin more detail Again thoseare the typeofuses
that want that visibility on the highway And totake an opportunity ofthat and againthat would
add to because we have limitedin the downtown core commercial todrive someotheropportunitiestokeepthosetripsinthedowntowncoreThenthelastcommercialusethatwe
have would be the neighborhood and someofthosearealready in place Thekindof that tend
tomeetthe dailyneeds which wouldbe for the most part gas Kind ofwhat yousee currently
out on Century Boulevardor atGalpin Those kindofconveniencegasstations Coffee those
sort ofthings Wedid provide as youpointed out in your meetingsthatwe really have nothingonLymanexcusemePioneerTrailbetweenEdenPrairiesowetalkedaboutthepotentialfor
another site there And then alsowe talked about atthebottom ofthe Y 101 and old 212 Ifwe
did some lightrail or in the futurethat wewould look atthat as an opportunity sowere just
notingthose in the comprehensiveplan as an opportunitytoprovideadditional commercial
zoning depending on howthings develop in those areas and what the demand may be SowiththatthoseareourcommercialrecommendationsandIdohavealotofdetailonthosespecific
ones and thosearein your comprehensive plan and anybody that wants those Ijust wantedto
point out Ididntwant tohave need togo through all those but againhotels aredowntown
Could hotels be in thelifestyle center Potentially sothose are thethings we lookatas we
develop that mallzoningdistrict Sowith that we end up with ourrecommendationfor theultimatedevelopmentofthecityThecomprehensiveplanThistiesbacktotheacreageand
obviously youcantseeall this soImgoing tobreakitdown byzoning type and youdon thave
this in your plan Youre looking atin your comprehensiveplan with this largemap SoId just
like totake a fewminutes and go through those Again pointed out on hereis thepotential fire
station Again this isall thesemaps all the were part ofthatcommercial mapIjust showedwereallpartoftheopenhousesthatwespentalotoftimetalkingtopeopleabouttogettheir
feedback Sothis is a recommendation and this iswhat exists for parksand open space 9 of
the city 9 4 ofthe city ispark and openspace Ithink its easier when welookattheseby
specific land usetoget a betterunderstanding graphically ofhowthat worksout Largelot 6 6
acres Again this is existinglarge lots As weprovide sewer and water there aresome thesearetheonesthatmorethanlikelywillstayaswetalkedaboutinthesewercomprehensiveplan
element We are wedid model an opportunity toprovide sewertothese over time in thenext
15 20 years If there isa demand or desire that couldbe hooked on we do have somesystems
that oryeah some septic systems thatarefailingthatwould makethatopportunity and well
21
62
Planning Commission Meeting November20 2007
talk about thatwith theMUSA phasing Lowdensity residential this is ourlargest percentageof
land usewith almost 5 000 acres 31 Medium and high density 2 7 Highdensity 1 5 WetalkedaboutthebottomsomeoftheplanningcommissionerslookedatthebottomoftheMoon
Valleysite That would be one site thats still hasntdeveloped Otherwise for the most part
exceptfor on thenorth side ofHighway5 mostofourhighdensity hasbeen developed Sowith
thatkindoflookingat all the residential 43 ofthe city is inresidential The agricultural zones
a little bit differentapplication as we looked athowtoprovide ordesignate that area thatsin thefloodplainCityEngineerPublicWorksDirectorPaulOehmementionedwhenwelookedat
the sewer model we did provide an opportunity Iftheres something upland on the southsideof
212 originally we never intendedtoprovide sewer tothat areabut wehave modeled thatalsoso
we put thatin agricultural That would be RSSGolf If thatusewantedtochange in thefuture
We have someother uses on theother side oftheY Car dealership thosesortofthings thatwewanttogethigherandbetterusesonWhiletheyreinthecurrentlythebacksideofthoselotsin
the flood plain theydo have upland thatcouldbe serviced so its hard when youhave someof
those existing housesprobably cantbe furthersubdivided soits a small percentage ofthe land
usebutwe did putthosein an agricultural which wouldalsoinclude some ofthoseareas around
212 thatareinthe flood plain sototry totake that outofthe mix Again thegoal istoget moreaccuratelywhatsdevelopableaswemoveintothefutureSowiththatIllsegwaytothe
commercial Sothe commercial right nowwhatwererecommending is the3 28 Wesee on the
Powersand 212 That area right there is also dual guided and welltalk about thatin a second
Wearerecommending somedualguiding and when Bob Generous goes through his
recommendationsfor changes youllsee that So thisis office so ifyoulookback atthis andKateyoushowedthatasredbeforeWerealsoshowingitaspotentialforofficeItcouldbe
either zoning district Soagain weremoving away from some ofthe office industrialand some
ofthe sites thatwereindicating pure office and that would include someother pieces for
example wererecommending someofthese and Bob will gothrough these againup on Highway
41 and then on Highway 5 Some otheropportunities toprovidesome office Officeindustrial6PublicsemipublicThisisschoolsTheArboretumAmajorityoftheseparks
Campfire Girlspark And thenmixed use and thats thearea where Villages on the Pond isand
that wouldalsobe the where the park and ride Southwest Transitand then theother commercial
piece atthe intersection ofLyman Boulevardand the new 101 Soifyouput allthat together
thats 19 ofthe land uses inthe commercial office mixed usetype Sowith the MUSAphasinglineasweindicatedyouknowinthepastwekindofa5yearincrement20052010
15 20 Inlooking atitand what we willbe bringingin in the 2010area in kindofthis light
green here there might not be enough developable acreagein thattoaccelerate or last for5
years sowerelooking atexpandingthat and that was what we had the neighborhoodmeeting onththe6andweinvitedagainabout250peopletothatTothatneighborhoodandaswellitwasagoodturnoutonthatWehadgoodinformationonquestionsaboutseweravailabilityespecially
thosepeople thatone arehaving access issues Gettingout onto 101 as the traffic continues to
get worst downthere and sortofthe implicationsfor youisthe Bluff Creek Inthe pastweve
kindofworkedourwayaround Bluff Creek Thistakes off ofBluff Creek GolfCourse and
allowsittogo intothe MUSA sooner than itwas recommended Butjust tobe clear in orderforthistodevelopthereneedstobeadequatetransportationAdequateinfrastructuresoifapieceof
property wants tobe developed they stillprovide a way togetin and out adequately and so
theressomeother thingsthat need tohappen We knowthat on thenext lift station weve
already acquired that property Youve seen it We did a wetland impact It will be right nextto
22
63
Planning Commission Meeting November20 2007
Powers Boulevard That lift station is hasbeen propertyhasbeen acquired Isin the capital
improvement plan The otherlift station asthe cityengineer indicated would be atthe bottomoftheYandthatwouldservicethesouthernareaofthecityAndagainjustbecauseyoureinthe
MUSA itsall development driven We got a lotofquestions ofwhen are yougoing tobe there
Were notgoingtobe there Its going totake a development todrive that desiretobringthe
sewer and water tosomebody so its all development driven
Keefe Inyour needingtoexpand generally wheredoes the line go to
Aanenson What wenoticed
Keefe No Imeanyouresaying thatyouhad a meetingand tomaybe expand whatson hereIsthatright
Aanenson No no no no This is what because wechangedit You know actually what we
did from thelast from the2020 wechanged the model and weaddedone moreyear ofgrowth
Inlooking atthe when the sewer and water plan cameback and we recognizedatprovidingwithinwhatwewouldcallthemajorityofthatpropertyisjustnorthofHomesteadLaneyour
earlier application and the Erhart property which weve walked with Mr Erhart looking athow
he wants todevelopthat property The largestlandholder in there Probably not enough tocarry
usfor 5 years So welooked atexpandingthat Again looking atthe golfcourse There needs
tobe adequate accessin and out ofthere whichmay require someadditional property acquisitionbythedeveloperTheCitysnotgoingtogoforwardwiththatbutjusttoallowthatasan
opportunity That was one question that we got asked The other question is that there are
people with some failingsystems Itsalways an economic decision astowhether ornot youdo
anysepticand well oryouwait tiltheres municipal services and those people wanttoknow
kindoffor their owneconomic financial decisions what the timing is on thatso againitwaswellreceivedandpeopleareconcernedaboutbeingabletogetinandouton101which
certainly is ahigh priority asyouknow thatwereworkingon Thistable right hereis something
thats requiredfor ustosubmittothe MetCouncil and reallywhat itshows is ourgrowth
incrementally whatweexpect for absorptionwith ourdifferentland uses Andreally ittiesback
towhatyou sawin the transportationelement whenwe put together thetrafficanalysis WelookedathouseholdprojectionsItalltiesbacktothathouseholdstripsthosesortofthings so
its absorptionand itall ties back Sowith that were going tomove toland use
recommendations which Ibelieve alotofthe residents are here on Sooneofthe big changes
from what we did in2020 to2030 besides just maketwo urbangrowth areas We lookedat
trying toclarify eliminating those areas thatwere unbuildablesowe get a more accurateunderstandingofwhatourcurrentlandusesareWerenotmakingalotofrecommendations
regarding the residential butcertainly the biggestchangeis going tobe in the commercial
application and the other oneis just todo someclean up Inthis map right here youcanseethe
most aswere trying toget throughtonight in the Novembermeeting Whats in blue iswhat
wevenoticed for the Decembermeeting Cansomeone speak heretonight Yes But what wedliketodoandweveaskedthecommissiontotrytostayontaskandwevebrokenoutforyou
wevegiven youa handoutofkindofthoseitems soweregoingtotry totake themin groups so
people canspeak on their specific issue Thats kindofbyneighborhoodand youllsee howthat
goes in aminute Idid also wanttoinform thecommission thatwedid receive some lettersand
23
64
Planning Commission Meeting November20 2007
youhave those in frontof you One isa petitionsupporting a regionalmall from anumber of
residents The other is aletterfrom Mr Dorseyand then anotherletterisfrom Mr Foxand onbehalfofJeffandTerriFoxregardingtheregionalmallsoIalsowantedtoremindyouthat
when we gotothatJanuarymeeting anythingthatwe received weput thatinthe compilation of
all the documents that have beensupported Also on the noticesthat were sent out every
property owner wasgiven notice We sent out 80 someletters toindividual property ownerson
this Some ofthem arehere tonight Wevemetwith them Alotofthemdid sendusemailsandsaidtheysupportwhatweredoingUnderstanditandsoIwouldsaywevespokentopretty
much every propertyowner that is up for a land usechange Sowith that we want togo through
the land usechanges SoIvegot are youready tokindofmovethroughthose
McDonald Imready
Aanenson Soweregoing tobreak thesedown The firstsectionwere going togothrough you
cansee is highlightedin redandtheseare the re guidings toparksand openspace
Generous As younotice on the mapfor the land useamendments orproposed changes wetriedtobreakthecityupanditsmostlygeographicalNorthofLymanBoulevardweregoing
totry toaddress tonight and then south ofLyman wouldbe inthe December meeting Thefirst
group ofthings thatwewantedtodiscuss were properties that areeither publicly owned or
theressometype ofcity control on it Either throughconservation easement or through
ownership Andtheseare theres17 parcels Theyre shown on the mapidentifiedas parcels 14b5691213151723262730and39Andtheseparcelsareallguidedformultiple
things either residentialbut what were recommendingaspart of thecomp plan updateis that
theyall be guidedfor parksand openspace becausethatswhat theywill be Theyreeither
wetlands Theyre storm water ponds Theyre areas that will not develop and soagain were
trying tobe more accurate with the land uses in ourcommunity so weremaking recommendingthosechangestothoseparcels
Aanenson CanIjust give oneexample Are yougoing togothrough them all
Generous Iwasntgoing togo through them
Aanenson To givean example on the Town Country Liberty atBluff Creek
Generous Item number 39on themap These areareasthat the city was dedicated as part of
the subdivisionfor parksand openspace Weregoingtopreservethe treesinthis area TheyrealsocontributoryareastotheBluffCreekcorridorsoweregoingtonowthatthecityhas
control ofit were goingtoshow iton our map that itisparks and open space We believe under
the existing comp plantheresa lotofarea that wasshown asparks and openspace that thecity
did not ownorcontrol and we were givingpeople a falseimpression thatwe actually had the
ultimate control ofthatproperty and sowerestarted waiting untilweactually get itin We willhavetheBluffCreekoverlayprimaryzoneshownonourcompplanmapsopeopleareaaware
thatthere willbe potential restrictions on development but not untilitactually develops will we
makethat thosesortofchanges
24
65
Planning Commission Meeting November20 2007
Aanenson Yeah letme just add one other This ties back alsowhen youlookatthepark
comprehensive plan theyve identified certaingoals ofpropertiestoacquire Certainly the cityattorneysadviceisthatthatstheappropriateplacetoshowwhereyouintendtodoextractions
Noton the land use You canalways astheproject movesforward itmay or may nothappen
and againwere trying togiveourresidents the best information that will there be a park or not
be a park Showing iton the landusemap meetsthe impression that we have control over the
property whichis in ourcase istrue sothe bestplace tofindout whatthe citys intentionifwewantedtoacquireparksistogototheparkssectionsothathasbeenclearlystatedinourgoals
andpolicies andyousaw that Thatthey intend toacquire sowe had some trails or identified
some trails and someproperties thatwe certainlydonthave control ofor and its identifiedas a
goalwhen they come in totry toget those
Generous Okay soI dontknow iftheres anyquestions
Aanenson Are there anyquestions ordoyouwant some other examples of
McDonald Are youguys okay Ithink continue on
Generous Okay the next is
Aanenson Do youwanttotakecomments on thator iftheres anybody that anyofthe residents
have comments wecantakethosenow
McDonald Well ifyouthink this is agoodplace tostopand take commentsjust on whats been
presentedthus far Okay Actually do commissioners have anycomments orshould we just go
topublic You want towaittil weget tothe end At this point thenwellopenthis up as a
public meeting for comments Anyone wishing tocome up and make anycomments on themattersthathavebeendiscussedthusfarpleasedosoandwelltakethosecommentsandif
theres anything thatwe canaddress we will Okay Seeing no one then why dontwe continue
Ben Gowan You saidthusfar
Aanenson Justthe oneswe just talked about
BenGowan The wholecomprehensive plan
McDonald No Justwhats been brought outthus far
Aanenson Yeah
Generous Okay the nextminigroup that were proposing toaddressare properties that were
recommended be guided topublic semi publicland uses These areproperties theres4 ofthemOneisthenewthewestwatertreatmentplantsiteintheLakeHarrisondevelopment Its
item number 7 on the plan 18 is the theres a 10 acre parcel inthe MinnesotaLandscape
Arboretumthat we madethis recommendation TheLandscape Arboretumcontacted usand said
they concur with that and more accuratelyreflectsthatarea becauseitwontremaina largelot
25
66
Planning Commission Meeting November20 2007
singlefamily development forever 27 isthe area near the water treatmentplant Weregoingto
change thatfrom right nowits parks and open spaceand commercial and showitas a publicsemipublicfacilityThenfinallynumber29whichisonLymanBoulevarditstheChanhassen
HighSchoolsite and the Chaska electric substation siteandthose will all be shown aspublic
semi public
Keefe Let me just ask a question On 27 thats what theland thats out infront that goes outtothecorneron5isthat
Generous Itsonlytheportion that is thewater treatmentplant site We have another
amendmentfor theAOM and thatsin the next group
Keefe Okay Thankyou
Aanenson As yourecall the school sitewas actually guided dualguided becausethe school
chose not or the referendum didntpass wewantedtogo back tooffice industrial sonowwere
just eliminating the otheroption Goodplace tobreak ifyouhave anyquestions or publiccommentsonthose
Generous Sothats it Now we go topage4 ofthe handoutI gave you
McDonald Whydontwe go ahead and continue because until we gettoa point where Iguesswereallystarttogetintotheheartofthiswherewelltakeabreakprobablyjustbeforewestart
discussing the regional mallareain detail
Generous The next groupingis we call itother amendments We believetheseareclean up
amendments Andtocorrect the land useson the map They include 13 parcels and theirnumbersareshownonthemapas238101115192021222527and28andthese are
wellgo through individually Item 2 is property thatis asingle family homesite Its zoned
RSF Its guided for public semi publicuse That waswebelieve a mistake Itsright nextto
the cityfire station 2 up there butitsbeyond the fire station site Theres no intention of
expanding thatsite as apublic useand sowewant tomoreaccurately reflect thatits residentiallowdensityTheresalsosomewetlandrightbehinditbutItemnumber3isHolyCross
Lutheran Churchsite Its zoned single family residentialon Highway7 Itsguided forpublic
semi public and really itshouldbe guidedfor residential lowdensity That wouldbe consistent
with the land use comein underresidential low density zoning and be potentially subdivided
Item number 8 is there are3 houses on Highway41 that areshown as part ofthe MinnewashtaRegionalParkthatarenotincludedintheparksowewanttoaccuratelyreflectthattheseare
residential large lotsites There are someissues ofaccessin servingthemwith urban services
but ashome sites theyarevalid properties and sowe wanttoaccurately reflect that Number 10
is this is where the MetropolitanCouncil sewer and water sewer line goes throughsome
properties and itwas guidedin the existingcomp plan for parksand open space butreally asKatementionedundertheparksandopenspaceelementtheresdiscussionaboutprovidinga
trailthrough there and actually acquiring differentland on thosesites inthe future iftheyreever
todevelopand sowe want to were recommending that the park and openspace land usecome
out and thattheybe guidedresidential low density whichis the balance oftheproperty on either
26
67
Planning Commission Meeting November20 2007
sides ofthem Sothatwould makethem consistent Item number 11 is onDogwood on the
southeast cornerofLake Minnewashta These properties arezoned RSF whichis single familyresidentialTheyreguidedforlargelotresidentiallargelotbutnoneofthemcomplywiththe
largelotdesignation We had tried tobringthese forward before but theres concernthat we
didnthave the sewer or water service answered Howtheyd be served and nowwith thecity
extension ofsewer and water tothat area werebringing inland recommendingthattheland use
and zoning become consistent Item number 15 is theKwik Trip and CVS site Theyre guidedforparksandopenspaceoverthecommercialportionofthepropertyandwererecommending
that that go awayand that onlythe outlots and theland that thecity owns in thatarea be guided
for parks and open space sowere just cleaning itup Kwik Trip did contactusand they concur
with this amendment Recommendthatitgo forward Item number 19 isthe Family ofChrist
LutheranChurch site South ofHighway 5 atStoneCreek Boulevardand this area isguided forparksandopenspaceandofficeindustrialbuttheparksandopenspaceisonlytheoutlotwhere
the Bluff Creekflows through theproperty and sowere recommending that thatbe changed to
showthat just the office industrial over the restoftheir lot Item number 20 again this isan area
thatis shown asparks and openspace in the comprehensiveplan buttheyreoffice industrial
sites Its part ofthe eastbranchofBluff Creek As part ofanydevelopment we will review itandpreservethecreekcorridorpursuanttocityordinanceandthewatersheddistrict
requirements However its not permanent openspace theentire site sowe want tocorrectthat
and show thatit isoffice industrialland Item 21 isa neighboringproperty This isshown as
part ofPrinces property and itsguided for parks and open spacebut really itsoffice industrial
land and sowe want toaccuratelyreflect that Item 22 there is somearea adjacent toBluffCreekItsallshownasparksandopenspaceinourcurrentcomprehensiveplanbutitshould
reallybe office industrial Until we have control ofthe propertythere aresomeareas that the
city does have control ofand wereshowing that in ourland usemap for parksand open space
Butfor that property itshould be shown as office industrial Item 25 is onLake Drive Its south
of its just south ofHighway 5 and Market Boulevard The propertysguided for parksand openspaceItshouldbeofficeindustrialThewesternhalfofthesiteisawetlandbutitsreally
zonedIOP and sowere makinga land useandzoning consistent Our wetland protection
ordinance will protect the wetlandon the property as part ofanydevelopment ofthis site sowe
want toagainaccurately reflect that Number 27 bythe balanceofthe properties atDakota 101
and Highway 5 On thenorth sidetheresone lotthat thecity owns thats really adjacent to101ItscurrentlyguidedforparksandopenspaceandcommercialItsreallyacommercialsiteso
were getting rid ofthe parks and openspace On thesouth side theres a landingfor the
pedestrian bridge thats shown as commercial That should really be parks and open space
because thecity ownsitand were going tokeepthat Thats aclean up And then the Sinclair
site and the property around that areguided for parksand openspace and commercial Thecityownstheonesitebutitsreallyallacommercialsiteandsoweregoingtotakesomeparkand
openspace land useout ofitand show itall as commercial And thenfinally parcel 28 ison the
east end oftown offofDell Road and Lake Drive East This propertyis guided for both office
industrial usesand mediumdensity residential The siteis developedas an office industrial park
and sothe medium density does not accuratelyreflect the potential orexisting useofthe propertyandsoweredeletingthatAndsothosearethecleanup15cleanupitemsthatwereproposing
aspart ofthe compplan update and reguiding those properties
27
68
Planning Commission Meeting November20 2007
McDonald Let me ask youa question because youskipped over a couple that arein our
handout Isthat 4 a 24
Generous 4 a s in my nextpresentation
McDonald Okay
Keefe Ivegot a questionfor you Aside from the parcelson Sinclair arethere otherareas any
other city owned oraretheyall theyreall sortofowned privatelyowned
Aanenson Well the others ones Ithink were the oneswe addressedatthe changing toopen
space that we took asan extraction for part ofthe development
Keefe No but anyofthesethat have parks and open space this other use were they all
privately owned
Generous Well thetwo at101 and 5 were cityowned
Keefe Yeah thosearecity owned ones The rest wereprivately owned
Aanenson Pretty much
Keefe Yeah okay Soreallythe change wouldthen allowthemtopotentially develop
Aanenson Exactly Exactly
Generous And theyrealready zoned commercial atleast inthat area Itsthezoning oflanduse
Aanenson I think the biggest change yougoback towhy some ofthoseare in place Before we
did the overlaydistrict we had a lotof property identifiedas parks and openspaceand once we
developed the overlaydistrict and used the applicationofa density transfer that really becamethetoolandtheotherbecameobsoletesoreallyitscleaningupandprovidingthatopportunity
for people todevelopthose And alsoI think weve learnedthat theresan expectation ifits
guided that thenthey think that thatsgoing tobe preserved in perpetuity where wevegot
anothertool soitreally isa clean up We did speak toa lotofpeople on thisissue Ithink weve
clarified what most people thought Iwould like tooffer ifthe Chair wouldlike toletspeak onanyofthesetopicsbeforewegetintotheotherbigones
McDonald At this point thenwewill openup thepodium againtoanyone wishes tocome
forward and address the issues that staff hasgone over up tothis point iftheresanycomments
oranyquestions oranyclarification youwouldlike ofanything please come up tothe podiumandaddressyourcommentstothecommissionersWellseeingnoonecomeforwardIllclose
the public atthis point and takeitbacktocity staff tocontinue
28
69
Planning Commission Meeting November20 2007
Generous And finally there arefive areas thatwe aspart of thisdiscussion thatwe believe are
substantive in nature All ofthemare up guiding their property The firstoneisitem 4 a ItsonHighway41justsouthoftheSevenFortyOneCenterWetherestwoparcelsWere
recommending thatbothparcels receive a guidingof residential mediumdensity This area acts
asatransition from the highway intotheresidential and the commercial tothe north
Additionally the northerlyparcel wererecommending thatithave a second guiding on itof
office use and this would allow someone tocomein there and developa project that wouldagaintransitionintotheretaildevelopmentdirectlytothenorthAspartofanydevelopment of
this site werekeenly awareofthe residential neighborhood behind it aswell asalimitation on
access toHighway 41 soas part ofanydevelopment review thatwould be something thatwe
would lookclosely at The secondarea isidentifiedasarea 24 Theseare the community
commercial areasjust tothesoutheast ofthe existing downtown area Theyre currentlyguidedforofficeindustrialusesWererecommendingthattheyalsobedualguidedtopermita
commercialuse in this forthe property aspart ofanyredevelopment ofthe area This land use
change would not require that anyofthe existing usesleave but itdoes provide another
opportunityfor the developmentor redevelopment oftheseparcels
Aanenson Let me just add on that We talked Iknow youraised this question before but that
would be new zoning thatwed have todevelopand youd help uswith thataswedevelop that
ordinance for what we would callcommunity commercial We donthave thatzoning in place
Keefe So just reiterate the locationofthis please
Aanenson This would be just east ofPowers We talked about thosebuildings kindofup to
just about to before thecreek Stops short ofthecreek
Generous Yeah its Park Road easttothe railroad tracks and Highway 5 Itsthattriangle Itsapproximately50acresintotalTheresabigwetlandcomplexinthecenterofitandthatspart
ofthe reason we think that that preserves thevisibility You cantdevelop there but youwould
be able toseethe back lots from Highway5 Alotoftheparcels on Park Roadare either open
space orparking lots sotheyrereally under utilized Theres a vacant buildingout there nowso
but
Keefe And this is isiton both sidesofPowers orjust east ofPowers
Aanenson Actually its on both sides Iapologize
Generous Its limited bythe railroad tracks Anditisreally a goodextension ofthe
downtown area but theyarelarger parcels soyouwould be ableto get aslightly bigger user
Aanenson Justfor the recordtoo one ofthe caveatsthat wedid put in there isthere needs tobe
some determination ifitdoes goretail tolookatthe trafficconfiguration and Ibelieve we havethatinourdiscussionwiththecouncilandoneofourworksessionstotalkaboutifcirculation
needs tobe improved on thePowers and 5 intersection and thenalsothe frontageroad atthat
locationtoo sothatwould be a condition ofrezoningthat wed lookat thetrafficanalysis
29
70
Planning Commission Meeting November20 2007
McDonald Canyouspeak alittle bitabout what is this community zoning
Aanenson Well thatwasone ofthenewzoning That wouldbe ifyougo back tothesidewe
have on that We talked about that as kindofa big boxarea Again when wedonthave
additional squarefootage inthe downtown core what will we do toadd somemore commercial
tothedowntown core Thereis a pent up demand for someofthat big boxretailand we
identified thatas homefurnishings potential buildingmaterials building supplies sportinggoodsandthatwouldhavethevisibilityonHighway5whichisdesirableofthosetypeofusers
so againitd be toget tothe downtown
McDonald Okay butImconfused about then iswhy wouldntaretail zoning work for that
Whydo we have toinventa newzoningcategory
Aanenson Well Iguess becauseweregoingtoredo all ourzoning so wefeltlike thatwould be
a separate type ofa category that we may notwant a big boxin the central core orintoa
neighborhood district soasitevolves we may changethat a little bit but were recommending
rightnowthatitbe commercial and we candecide on the exactintent ofthe zoning aswe movethroughthatpartoftheprocess
McDonald Gives youalittle bitbetter control over areas asfar as
Aanenson Well its the same rationale we have different hierarchynowwhere you have aneighborhoodbusinessTherescertainlimitationofusesthatwouldgoonthereasopposed to
the downtowncore
McDonald Okay
Generous And then finallythe last3 are identified as 33 34 and 36 These properties are
identified inourretail market study asapotential area for the regional mall They recurrently
guidedresidential low and medium density Were recommendingthat thatgo awayand thatwe
guidethem for commercial and office users Again developmentofthis area would be
contingenton the city developingthe appropriate zoning categoryand a developer coming inwithaprojectthatmeetsourcriteriathatsidentifiedinthecomprehensiveplanOtherwisean
office corporate office complex would also work in this area too Highvisibility Highaccess
from the newHighway 312 comingthrough that There ispotential iflightrail comes in thata
stop couldbe provided atPowersand 212 sotheres alotgoing for this site And so were
recommendingthatwe makethatchangetofacilitate thatifits going tohappen And thosearealltheamendmentsthatwerelookingatreviewingtonight
McDonald CanI ask aquestion about 4 a because youkindofbrushed over somethingthat
seems kindofcriticalabout access onto 41 Oneofthe problems wevehad before anytime you
get onto a county or state roadyouhave access issuesabout where youcan do things Isthispropertyalreadygotanaccesssowedonthavethatproblemoristhissomethingthatwevegot
tolookatas far as this development
30
71
Planning Commission Meeting November20 2007
Aanenson We have looked atthat and thats why webrought that sreally what precipitated the
recommendation for change There was an old Iknowthe applicants here or theownersherebuttherewasaretailtypeuseonthatsiteRightnowinordertogettoitMnDotdoesntwantto
giveaccessdirectly tothatbecause itconflictswith the reconfigurationof41 as youaccessinto
the middle school site soreally itneeds toget access from the south which the developer tothe
south the owner ofthesouth is notready toproceed or tothe northwhich isthe commercial
site whichis why we recommended the Sevenand Forty One Center shoppingcenter thatswhywererecommendingthateitherhaveanofficeuseoramultifamilyuseWethinkfor
singlefamilyresidential whenyoucantget toit topographically its isolated and theroad
extensions not there Itd be a difficult parcel todevelop sothatswhy we thought its kindof if
itwasan office usethat provides thatbuffer betweenthe commercial and newresidents thatare
there and for noise attenuationand thelike as youre adjacent toastate highway
McDonald Okay sothere arelimited optionsas far as access and everythingand thats what
kindofguides this forward
Aanenson Correct Its a little bit problematic You have tokindofwork with the propertytothenorthorwaituntilthepropertyownertothesouthisreadytodevelopandagainthatwould
all be dependent on thosetwo parties toworktogether tomake that happen
McDonald Okay Does anyone elsehaveanyquestions about anyofthese issues Kathleen
Thomas No
Keefe No
Dillon No
McDonald Okay Well one ofthe things thatIwill probablywant todo iscall a break at9 00
Were probablyata point nowwhere we ought toopenup the floor todiscusstheseissuesand I
know that this isprobably going tobe what everyone ishere for but ifwe dontbreakat9 00 Im
not sure we everwill Sohavingsaidthat Iwill probably stopthis after the firstone or twopeoplebutwewillcomebackandwewillresumeallofthisSohavingsaidthatwellnow
openitup for a public forum and anyone wishing tocomeforward please comeup tothe
podium Stateyour name and address and address your comments tothe commissioners
Ben Gowan My name isBen Gowan Imon the 6440 parcel here and weve been on thatpropertysince1939andofcoursewedontlikechangeChangedoescomeButIvebeen
advised thatthis change isnot all bad With thatIstand amended
Aanenson Yep I just want topointout Mr Gowandid have a coupleofquestions which
wevetried toexplain tohimis re guiding theproperty does not mean developmentsgoing tohappenWearerecommendingalittlebithigherresidentialAgainitsyouknowitsa
transition area Youre surrounded byparks That doesntmeanyouhave todo anything today
He will stillstay zoned Hes zoned residential single family We haveno intention torezone
him Justtochange the land use ifhe chooses touseit If he doesnt when Ifirstmet with Mr
31
72
Planning Commission Meeting November20 2007
Gowanwhen he said2030 Imay not be here Imay notbe hereeither in 2030 so the plan goes
that long Sowecertainly theintentis togivesome otherzoning options there on that propertyagainnexttoastatehighwaysurroundedbyparksandaccesstocommercialWefeltthatmight
be another land use change Werenot recommendingthatmany ifyousaw on the land usethe
amount ofmedium and high density we donthave thatmuch We thought this might be an
appropriate area and we certainlyitsup toMr Gowan whenhes ready todevelophis property
so
McDonald Could youclarify which items thathes talking about
Aanenson Sure its4
McDonald 4 a
Aanenson Yeah
McDonald Okay
Aanenson Hes the mostsoutherly piece The nextpiece on the north end is the next piece
McDonald Thankyousir Next
Terry Palmer My names Terry Palmer Bens my father IthoughtIheard yousay something
about accessibility from either the south orthe north
Aanenson Right
Terry Palmer Andthatwasreal quick
Aanenson Sure sure And I
Terry Palmer What does thatmean
Aanenson Yeah Ispoke toyourfather about thistoo Were notforcing that Thatsup toa
developer
Terry Palmer No Ijust this isthe firsttime Ive heardof it Imsorry
Aanenson No Im sayingthatreallythe in meeting with the State thatwouldbe their
preference istotry togetaccess either from thenorth or the south
Terry Palmer Okay the northbeing
Aanenson The shopping center
Terry Palmer The strip mall
32
73
Planning Commission Meeting November20 2007
Aanenson Correct Correct
Terry Palmer Okay butthen itwouldnt sopossiblyifa person thatdevelops comesthatway
itwouldntaffect hispiece ofproperty with the accessonto 41 and stuff like that
Aanenson Thats correct Thats correct
Terry Palmer Okay Thats whatI wantedtofindout Thankyou
McDonald Okay thank you
GaryReed ImGaryReed and werejust northofBen We have 2 21acresthere and were
readyfor something Wevebeen rentingout Theyvetrashed thehouse My folksold house
Weve been there since 19 Ithink my folksbought thatproperty in 35 Sowevebeen there and
we had Reeds Drive Infor manyyears which ifyoureold enough youd probably remember it
Andsoitwas youknow the commercial
Aanenson Kindofquasi commercial yeah
GaryReed Yeah but right nowthe houseis destroyed by therenters We need todo something
with itsowevegot somedevelopers workingon itand we live there so youknow inback ofitsowereinterestedinwhatmightgointheretooyouknowjustlikeallofourneighborsAnd
when we workedwith the Highway 41 Crossing Icame tomany meetings and we decided acul
de sac and eliminate thataccesssothey couldhave their access and oneofthe things Iasked
for in that wasa easement intothatshopping center And what Igot wasa 9foot easement for a
trailanditwasntmy intentbecause myintent was toisolate the neighborhood bycutting offthWest64Streetandthenpossiblydoingsomethingonthefrontagesothatwaskindofmyplans
and interested in getting somebody in theresoIwould talktohimabout that Hes got
somebody interested sothats kindofourstory
Keefe Can you howtheseproperties stack just from yeah
Aanenson Sure If youlookatthe southern of41 youlookattheresa Super America and the
strip centers right behind that Theresa drivewaythat goes around the back ofitsoit
topographically this is sittingup a little bithigher Its kindofproblematictoconnect itto but
thats youllbe seeing a project on the 7 and 41 Were hoping that we canwork with them toprovideaccesstothisparcelTypicallywhenyouseeprojectsthatwedowetrynottolandlock
somebodytoprovide access Obviously yourecorded that or protected that but
Gary Reed Well wedo have 40 feeton the the school and theyprobably wontput onein until
somebody getskilled there Thekids standthere and trytorace across there and therestrafficcomingfrombothwaysandmergingandweregoingtoloseoneofthestudentsatthatposition
Keefe So ouraccess just tocomment Imeanis there accesscapability wouldntthe access
capability atthe southern end
33
74
Planning Commission Meeting November20 2007
Aanenson No their recommendation istoTitmore directlyacross from thedriveway goingintothemiddleschoolItactuallyendsuponMrGowanspropertysoifhesnotreadyto
develop then wejust pursue another alternative Correct tothe north Correct And we did
drive itwith MnDot lastfall sowevegot their inputon thatand youreright The signals far
removed and so
McDonald Thankyousir
MichaelSedley CanIask for one point ofclarification Im working with Mr Reed on it As
Iunderstand itthe theres conversation about redeveloping thenorthern piece the 7 and 41 site
That would be ideal and we could get someaccess there but inthe event that that didnthappenandMrGowandidntdecidetodevelopwouldwestillbeprovidedthatrightinrightoutifwe
had ouroffice useor would we go would we have towork with the north
Aanenson Well Ithink atthatpoint wed have tolookatwhat thetrip generationis Whatthe
usewould be That may dictate whatyoucan do with theproperty because certainly we dontwanttocreateanunsafeareaso
MichaelSedley But you ofcourseeven ifhe didntwant todevelop allow some typeof
easement agreement
Ben Gowan Icanthear what youre sayingsir
MichaelSedley Sorry aboutthat All Iasked was if ifone oftheproperty owners northor
south werentgoingtodevelopbut were amenabletoan easementaccess ifthat would be okay
with the city
Aanenson Its myunderstanding thatifyouhave apiece ofproperty youhave the righttohave
access toit and theymay limit thattoright in right out Unfortunately atthat location its hard
torestrictsome ofthoseturn movements right in right outsothatswhy wewould lookatthe
useand expect toget sometrafficmodeling on that
MichaelSedley Yep as we would provide
McDonald Excuse me sir before youleave could youstate your name and addressfor the
record
MichaelSedley MichaelSedley SedleyDevelopment Partners 2460Emerald Trail in
Minnetonka
McDonald Okay thankyou Anyoneelse wish to come up
PhilBoss My namesPhilBoss IownBody Mind SpiritRetail across the street from Market
Square Imnotsure ifthis iseven the appropriatetime or placetoaddress this Have we looked
atthe economic impact ofthe other retail businesses in Chanhassen ifthis property goes
34
75
Planning Commission Meeting November20 2007
forward And theconcern is Iveseen alotofbusinesseskindofcome and goover the last
couple yearsas we built newretail spacethatthey couldstruggle iftheresanother center socloseyouknowthatsdrawingthecustomers
McDonald Iguess atthis point since wehaventgotten intothe details ofthe regionalmall and
whatwerelooking atthere maybe the whole economic impactshould wait
Aanenson Well Iguess Id like totakea stabatansweringthat Ithink the McCombs study is
on the citys websiteand certainly ifyoulookatwhatthey recommended which we showin the
plan that wedid recommend up to112acresofcommercial retail and youcan lookatthe two
tradeareas and differential between the twoand thats whatwere trying tocreate byadding some
moredowntown tokeepthe trips based onour householdprojections that its theirrecommendationthatthetwocouldsupporteachotherIguesswellgobacktothesame
discussion we had whenwe did Villages on thePond There were a lotofpeople that were
totally opposed togoing across on Highway 5 Thatwe couldntsupport that Therewas a lotof
controversial after we builtFestival Food whether ornot we should even doByerlys soIthink
we always tried totake that intoconsideration Certainly the downtown isnear and deartomyheartIbuiltmycareeronkeepingthatasviablesoIdontthinkandastheCityCouncilandthe
Planning Commissionhasspent alot oftime discussing that butcertainly we intend todo
PhilBoss Ijust want tomakesure everybodys keeping thatin mind Idontknow
Aanenson Absolutely
Keefe Well and youknow just in termsofzoning whenyoure looking atyouknow potential
guiding andstuff Thereisntmuchcompetition forcomplimentary Ithink thandirectly affected
PhilBoss Okay
McDonald Well atthis point why dontwe take
thMelBrooksMynamesMelBrooks2448West64 Were the property directlybehind thissmalloneMyconcernisasidefromtheadditionaltrafficthatwillbegeneratedinthat
intersection the therestwo residential properties on there nowand itszoned residential We
would like tosee itstay thatway Andreally thats all I havetosay
Aanenson Sothats the just tobe clear its the ReedOrchards pieceyoure talking about
MelBrooks Yes
thMichelleCurtisMynameisMichelleCurtisandImrightnextdoortohim2446West64
Street Iguess mybig concern is theaffect ifwechangewhat itis nowtotheneighborhoodthatsdirectlybehindititwouldbetothewestofitTheReedsthesameplacethathewas I
dontknow all this stuffthatyouguys are talking about Idontunderstanditall completely but
itiszoned residential right now isthat correct
35
76
Planning Commission Meeting November20 2007
Aanenson Thatscorrect
MichelleCurtis If someonewas tobuild asingle family dwellingon it would they stillhavethe
samedriveway access Wouldthatbe allowable
Aanenson Correct Correct
Michelle Curtis That would not change If itwasmade intoa park ofsorts and there was no
dwelling would there needtobe an accesson it
Aanenson Idontknow whowould Idontbelieve the city would buyitfor a park
Michelle Curtis Imnot thinkingthe city Imthinking like apersonal private If someone
bought okay If Iboughtit couldI just leave itasitis and have no access on it
Aanenson Absolutely
Michelle Curtis Okay Ithinkthatsall for now Thank you
McDonald Thank youverymuch for comingup Does anyone else wish tocomeup and speak
on theseissues thus far Okay then atthatpoint Illclosethe public meeting and we willtakea
10 minute break Well reconvene at9 10
The Planning Commission took a shortrecess at this point in the discussion
McDonald Kate ifyouwanttogo ahead and continue with our nextitems
Aanenson Sure Ithink werestilljust kindofopening theres people thatwant toaddress the
34 35 36 issue which we didnthave yetsowelllet thosespeak If youwant toopenthe public
hearing on that portion
McDonald Yep Thankyou
VernelleClayton My nameis VernelleClayton I liveat422 Santa Fe Circle Howeveras
proud as Iam ofbeing able tocomeand talk toyouaboutthe city asa resident I am heretonight
asapart ofmybusiness which isworking with bringingfolks toChanhassenover along period
oftime Since actually since about 1992 when we did Market Square Soina varietyofways IfeelthatImresponsibleforalotofthesefolksthataredoingbusinessindowntownChanhassen
Currently Imanage Colonial Square MarketSquare theVillage on thePonds project and
coordinating the development there and inthatprojectI managethe some ofitsretail Thefinal
one building This is the building with Starbucks andthe Lakewindsbuilding Soas Isaid Ifeel
alittle bitresponsibleand soIfeelthatI must address afew things thatarekindofacompositeofwhatIthinkandwhatsomefolkshavebeentalkingtomeaboutInfactoneofthefolksthat I
talked to and haventtalked to because Ihaventhad much time really youknow many months
is certainlya lotoftime but as ithappens ofcourse Iwaitfor the last minute Ihaventhad a
whole lotoftimetotalk topeople but Idid talk with a managing member ofthe Market Square
36
77
Planning Commission Meeting November20 2007
Partnershiptosee ifhe had anythingthat hewantedme topasson toyoutonight and his
comment histhoughtswere thatgee the regionalmalland downtown arediametrically opposedbutVernellejusttellthemnottoforgetdowntownSoforpurposesofmydiscussiontonightIm
going toassume thatdowntown alsoincludes the area recently labeledas southdowntown We
dontwant toforget that area either becausein that area we have a need for fillingin the future
andhopefully relativelynear future an additional approximately 60 000 squarefeetofretail and
that wouldbe ofthe upscalelifestyletype tenants thatwe want tohelp in attracting tothatdevelopmentThatsprobablymorevulnerablethanalloftheotherareasofdowntownwith the
possibleexception ofthe Market Street Station which wouldbe terribly vulnerabletoa lifestyle
type development elsewhere The taxpayers and the private sector have spentliterallymillions
ofdollarscreating the downtown whichnowthousandsofChanhassen residentsareenjoying
During the period oftime thatdowntown was being developed the mantra around here wasChanhassenwillneverbearegionaldrawKatealludedtothatmantraearlierThosewho
created thedowntown and invested hereare theyre reliedon there being no regional draw and
relied on theongoing viability ofdowntown The 1998 update ofthecityscompplan wehad
Andofcourse Ididntbringmycopy Well let mejust its probably notgoing towork thatway
so letmejust read it Illread itquickly This is from the1998 update ofthe compplan and itrestateswhathadbeenapartofthisincludingthepriorcompplanThecityandthisisthelead
in tothe commercialsection Thecity hasmaintained a long standing policy ofdirecting
commercial development intothe centralbusiness district Chanhassenis rather unique amongst
suburban communities in thatithashistorically had and maintains an active downtownbusiness
community Inrecent years therehasbeensubstantial public andprivate investment infurtheringdevelopmentinthisareaandtheresnodesireonthepartofthecitytoseethateffort
diminished with construction ofcommercial centers orientedto highwaysoutsidethe business
district Itgoes on tolistjust what someofthemare and then goeson tosay the city continues
topromote the extension ofthe CBDasa full service retail nodefor our residents It hasbeen
the long term goalofthe city tohave the majorityofthe commercial development occur inthedowntowncoreTherewillbeadditionalcommercialdevelopmentinthenext20yearsbutit
willbe developed as asupport base support usetoaPUD ormixed usedevelopment It will be
developedashighwayor general business district elsewhere in the city but rather a compliment
toamixed useor PUD development That swhat thefolksinvested in Chanhassen relied on and
todeviate from thatstated plan nowmeans adramaticchange not onlyfor the businessesbutalsotheresidentsInmanywaysChanhassenwillnolongerbethecityFamilyCircledescribed
And yes we knewwhen that plan was putin place that there wouldsomeday be a 312 corridor
through thecity Now however there is alotofwishfulthinkinggoing on Wewish we could
have such a convenientaccess tosomany shops and we wished that downtown would have
stayedas viable asitis now Wewish we could have ignored thefactthat ifcities aretohave asuccessfuldowntowntheycanthavetwofocalpointsWewishwecouldignorethefactthat
not all existing downtown businesses canbe protected bylisting certain uses as being prohibited
in the newarea Wewish itdidntmatter thatwe are makingdecisionsbeforeweknow whatthe
impact of312 will be on the trafficwhichdowntown Chanhassencurrently captures We wish
the folks 312 will thendrive downtown The prospect ofa largeregional centerlooms verylargeanditshardtostayfocusedontherealquestionItshardtostayfocusedonthelittle
downtown canary whentheres a 900 poundgorilla atthedoor Idontbelieve theres anyone
involved inthe decision makingprocess whowould approveanyproject in projectknowing that
itwoulddetract fromdowntown Inone ofthe recent new suggesting that the question tobe
37
78
Planning Commission Meeting November20 2007
answered is whatwouldbe the conflict ofbeingaregional draw That is the realquestion and it
hasntreally beenfully answered Sowhere are we Wevedone theMcCombs study HadsomethingsIwasgoingtosayaboutthatbutIllskipitbecauseIdontwanttotakeupsomuch
ofyour time Andin addition tothat the McCombsstudy then asitwasevolving itbegan
talking about a lifestyle center alongHighway 312 Andmany ofusconcluded thatas youread
through it assumeda lifestylecenter But then itmorphed intoalifestyle orregional shopping
centerstudy Then the Minneapolis paper publishedan articlein whicha regional coveredmallwasdiscussedThesearealldistinctlydifferentcreaturesandtheywouldeachhaveadistinctly
differentimpact on downtown To makesense ofthe variousalternatives SRF provided some
inputwhich included the impact on down tosomedegree We talked earlier itwasntan impact
economically necessarily Well itwould have some some degree ofdiscussion ofthatbut and
so nowwe have thecompplan before us And soImthinkingtogivethe city and downtownbusinessandtheseresidentsalittlemoretimeinwhichtoanswergetsomeoftheanswers
ferretedout the concept ofdualzoning ifincluded in a proposedcompplan and truthfully Im
not familiar with exactly howmuch leeway the concept affords us To be more cautionthen to
be absolutely sure thatthe stakeholders have sufficient time in which tostudy the advantages and
the disadvantagesof regionalretail component My hopestillis thatyoulldoexactly what wasdonewiththelandonwhichVillageonthePondsisdevelopingThezoningdidnotpermitthe
amount ofretail that wasapproved And a part oftheapproval process included rezoning the
property That gave the city and everyone a chance totruly focus on what was needed You
know whats popular and profitable in retailchange isrelatively prickly At a seminar recently I
heard thatthe is fading from the lifestyle boom Coveredmalls which were consideredabsolutelydeadjustafewyearsagomayactuallycomebackintovogueWemayseeaproposal
for this property sometime next yearorcircumstancescould change sothere isno proposal for a
few years Thus the commitments the current council mightfeel towardsthe proposal and
towards downtown might be totally different fromthe goals ofa differentcouncil Inthatcase
we also needtoanswer the question arewe really confident thatfuture councilswill be of likemindstothoseapprovingthenewcompplanandthedualzoningoptionAtthispointmost
businessesand land ownersin downtown Chan are unawareofthe proposedchange in thecomp
plan and certainly are unaware ofthe impact on downtown and itwasbecause Icalled a few
They dontlive here and there simply is no not there just simply isno goodway of
communicating with thembecause theydontlive here They donteven read theydonteven gettheVillagersounlikealltherestofuswhoonlyinfrequentlyreadittoseewhatsgoingonthey
donteven get it Soin talkingwith them Iexplained where we were Iwas alittle hard pressed
tocreate anykindofurgency Iwontconvey to youeverythingthatthey saidbut theyfelt itwas
an important issue but they werentquite sure where the city was going right nowso they werent
quite surewhat torespondto Sowhat Imleading upto going from a regional area would notIwanttogivetheselandownersachancetofocusratherthanpotentialseveraltypesofusers
but italso gives stakeholdersa chance tomeasure the impact ofthe proposal againstwhat other
proposedchanges toland uses areadoptedas a part ofthe compplan And Imjust saying we
have somuch its kindofhard tofocus on what exactly itwill be impacting becausethe idea that
weregoing tobe able toexpand southof5 for InstantWeb on thosefolksare a big plusfordowntownThatwillhelpdowntownPeoplearegoingthereTheygoacrossthestreetandso
ifthatsin place and thenwe do aregional mall thats onething But ifthatsnot in place and
wedo aregional entirely differentthing regional mall yes there might be dressshops and all
that sortofthing out there that dontexist in downtownthat peoplewant because ofcourse we
38
79
Planning Commission Meeting November20 2007
want everythinghere inChan Perfect place youwant togo Its allthe other little stores that
will go along with itthat will be competingwith the stores that arehere in downtownDowntownisashoppingcenterAndwecallitthecentralbusinessdistrictbutitsashopping
centerand itmeets all the thingsthatother shopping centers need whichis alittle bit
entertainment Little bitfood Placestopick up whatyoureally needand some places tolook
at and across the streetwevegot a Molly Gs Weve got Knit Whits and theyre fun places to
look And we have fun places in the Market StreetStation Thatcomplex But thoseareall thesamekindoffunthingsthatwilldefinitelybegoingintowhetheritsalifestylecenterora
regionalcenter or Sothats the competitionthat will take away the fun from downtown and
whatare wegoingtofill all thespace with Sowith all ofthat that does kindofconcludemy
questions and commentsand recommendations but Ido want tobesure that youunderstand my
thatmy purposehere isnot just toeliminate fair competition Rather seek toavoidhaving theactionofagovernmentalentitycreateanunfaircompetitivesituationforourdowntown
businesses Unfair labortochanging the levelofthe playing fieldafter the game hasbegun
Given a fair shake businesses canbe very creative and whenthe newbarber shop opened up
across the street from an existing barber shop and the new guyhungup a signthatsaidhaircut
7 00 SoImseeing a sign on the existing shop hung out a sign that saidwefix 7 00 haircutsInourcasenoneofthecustomersfromthenewshopwouldevenseehisoffertofixthenew
haircuts Sonowifsomeone ifsomehow the proposedregional mall conceptcould be
accomplished with traffic from downtown nota problem Thats great We re not anti
development Werereally antidowntown destruction Thank you
McDonald Thankyouvery much Does anyone else wish tocome up
Aanenson Mr Chair canI just clarify oneissuesregarding the dualzoning just tomakesure
the commission understandswhat weredoing on the dualzoning
McDonald Okay
Aanenson Clearly wevestated we have to weregoing to comeback toyouwith new
designations ofourcommercial districts Sothats oneissue sohave we decidedexactly how
thats goingtolook No Butthe control we have is wererecommending twoland usedesignationsEitherofficeindustrialorcommercialIfwecantgetconcurrenceonthe direction
we want togo withthat and wehaventidentified exactly what thatsgoingtobe Thats what
were going todo as a group and soifitcantget towhere the city uscollectivelyasa group
decidesthatwe wantittobe thenwevegot the fall backposition whichis legaltohave the
office industrial We canpick and choosethat Certainly alotoftime wasspent and wecommunicatedthatinallthepublicmeetingsthatwearemovingfromastheMcCombstudy
said from a conveniencecommercial which iswhat we aretoday tosomethingdifferent
Clearly thatwas the goal in1990 and Idontwant todiminish that But this while we really felt
comfortable and the developer had waited for ustogo back andweve really takena lotoftime
over the last year toopen this up toa broader group And itsmy understanding theChamber ofCommercedidendorsesomeoftheconceptoftheregionalcommercialsoImnotsurethereis
concurrence withinthe business community I meanwecertainly cangoback and touch on
some ofthat too but Ijust want tomakesure we do have the dual guiding and its ourintent to
come up witha commercial zoning that workstothe best ofboth advantages The downtown
39
80
Planning Commission Meeting November20 2007
embellishing that aconvenience trade thatitis Andthen the regional mall tomeetthe fair
market which is alarger trade area
McDonald Okay thankyoufor thatclarification Kate Does anyone else wish tocomeup and
make comments Okay atthatpoint Illclosethe publicmeeting for this section ofitand come
back
Aanenson I think there aresomepeople herethat want tomakesome other comments on some
other uses On commercial
McDonald Then welljust throw itopen for public comment for anyone that wants tocome up
andcomment on anything thus far
Mike Wardle Mr Chairman commission members My name isMike Wardle Imwith
BrightonCorporationin Boise Idaho Ijust want toplant aseed this evening on a sitethat
technically Ithink would orthearea that would be reviewed atyour nextmeeting and we will
be here for your next meeting todiscuss this aswell Igave Kate a power point presentation butIhavehardcopiesthatIdliketopresenttoyouaswellVerygoodthankyouAsIsaidIjust
wanttoplant a seed this evening concerning aproposal thatwe willmake byformal application
in probablythe early part ofnext yearfor the land usedesignation changeatthe southwest
corner ofLyman Boulevard and Highway101 If youcould go tothe second could Ihandle
that
Aanenson Yep
Mike Wardle Okay Verygood thank you Thesite specificallyasInoted is atthe intersection
of101 which istothe right ofthis site Lyman tothe north That newlyimproved intersectionwhichIguesswillhelpservethenewfreewaywhenthatopenssoonMorespecificallythe
location is just south ofan already approvedneighborhood commercial area Southwest and of
course this isan olderaerial Does not show thehighway improvementsbut 101 is nowfully
improved between the commercial area and the park and ride Tothe east of101 which isnowa
6 lane highwayis Springfield subdivision which is buffered by the berms Then thereare3singlefamilyhomesjusttothewestofthesitebeforeyougettoanewHighway212Tothe
southis the bluff overlaywetlands Bluff Creek overlaywetlands thatclearly hasan impacton
the site Aslightlydifferentaerial perspective the sitein the center and youcanseeon theslides
aboveand below thatthe parcel kindofoverlaps Inbothcases itidentifies thenthoseuses
adjacent toit If youlookatthe center slide thearea directlynorth ofwhere itsays LymanBoulevardistheapprovedneighborhoodcommerciallocationAndsoweremakingaproposal
orwill makea formal proposal but figured that itwouldbe goodtoget this inthe record for your
consideration as yougo throughthis process with that property be designatedmixed usein the
2030comprehensive plan update The next slide shows a comparisonbetween the 2020 land use
plan which isthe small excerptin the lower left The site inthe draft document thatcame offyourwebsiteYoucanclearlyseethemixedusedesignationofthelandtothenorthwhichis
hasan underlying zone Ibelieve ofneighborhood commercial which would be aneighborhood
business BN Interestingly enough the 2020 land useplan shows thatthe Bluff CreekOverlay
boundaries which the 2030 draft atthis point does not Thenextslide which comes from the
40
81
Planning Commission Meeting November20 2007
current draft and yousaw thisearlier inan overallcitymap thatKatepresented itshows this
parcel and even thoughconceptuallyits probably alittle exaggerated italmost identifies thesubjectthatweretalkingaboutandwouldmakeanapplicationforasanorphanEssentially its
really confined and constrained bytheBluff CreekOverlay tothe southand the otheruses tothe
east and west So byapplying the mixed usedesignationitwould allow consideration ofa
neighborhood business zone consistentwith thatthathasalreadybeen approved northofLyman
and hasaface toface relationshipwith them But italsorecognizes the sites uselimitationscausedbytheoverlaywhichreallymeansthatitdoesnotrelatetoanyoftheothereastwestor
southerly directions Now the current zoning map obviously shows this parcel currentlyas
agricultural estates Slightlylarger excerpts on the next slidethatclearly shows the influence of
the overlay district and therelationship with the business area tothe northwhich is actually
zoned PUD and thatwasthe basis uponwhich thatapproval was granted The Bluff CreekOverlayagainsimplyreinforceshowthatparcelhaslimitedrelationshipandopportunitieswith
other areas And then finallyjust some current or recent photographsasthey were completing
the improvements inthis particularcase on Lyman These pictures were takenfrom the fully
improved intersection which aligns with the old Highway101 where itTd intoLyman And
this is afullaccess thats provided The utilitiesare already stubbed tothis site Aclose uppicturelookingeasterlytowardsthenewintersectionwith101Springfieldsubdivisionbehind
with the berms Andthen looking southerly southeasterly youcanseehowthe property tailsoff
intothe wetlands complex tothe southand ofcoursethe berm area on the other sideofthe 6 lane
highway thathasnowbeenimproved at101 And then finallyjust tore state the proposalthat
we willmakein aformal recommendation oraformal application soon isthatthe sitebedesignatedmixeduseBechangedfromthecurrentresidentiallowdensitymixedusefor
consistencywith the neighborhood business property tothe north and alsowith acknowledges
the sites isolation from the otheruses whoarein the vicinity which specifically Springfield
subdivision tothe east which isacross the 6 lanehighway and buffered by substantialberms
From the 3 singlefamily dwellings tothe westwhichwould be tothe right in thatphotographWhichbytopographytheyfalldownawayfromthissiteandofcoursetheBluffCreekwetlands
overlay which constrains itfrom the south SoagainMr Chairman Iappreciate the opportunitythtoplanttheseedWewillbehereonthe4ofDecemberiftheresadditionalopportunityfor
discussion and clarification atthatpoint and wouldbe happy toanswer questions ifyouhave
them atthis point
McDonald Okay Iguess atthis pointbecause this is something thatreally wasnton the
agenda and asIunderstand notice hasnotgoneout toanyone around the area what Id like todothistableanydiscussiononthisuntilthe4togiveustimetoputoutnoticeofthisproposalandththatanyonewishingtomakecommentcancometousonthe4orcontactcitystaffinbetweenthtimeandwewillthenaddressthisissueonthe4
Aanenson CanIget clarification on thatMr Chairman Werenotsupporting this change We
have met with Brighton Corporation and we certainly understand they want toget iton the
record thatthey dontagree Were notin concurrence on that which isappropriate WellputourresponsebackbuttheyrepursuingazoningapplicationoutsideofthelanduseTheyjust
want toget on the record tosay that they disagree
McDonald Iunderstand that
41
82
Planning Commission Meeting November20 2007
Aanenson So werenot goingtohave time togetnotice out tothat neighborhood sohessettingupameetingHesworkingthroughthatprocessseparatelywhichisappropriateBut he
just wants toget on therecord that they disagree with ourrecommendation Butifsomeone did
wanttoappear next in2 weeks certainly youcanhear thatcomment
Mike Wardle Mr Chairman ourobjective knowingthatyouarein the process oflooking atallofthelandusesinthecommunitywefeltthatitwouldbeanappropriateconsiderationthatyou
should atleastreview As Katenoted we wontmakean application untilafter the firstofthe
year but we are in the process andbeentrying somewhat unsuccessfully thus far toget a
neighborhoodmeeting established sothatwe canmeetwith them and we willbe meeting with
staff in apre application in December and thenfiling formalapplications for comp planamendmentifnecessaryandarezoneandsoforthafterthefirstoftheyearSowedjust
appreciate the opportunity toatleast makeyouaware oftheinterest
McDonald Okay and I guess well Iguess part ofmy commentsis thathopefullyover
television this goes out and againifyoucannot get out anynotice atleast residents ofthe area ifthyoudonothaveapublicmeetingmaycomeforwardonthe4andthenatthatpointwewillbethabletoaddressthisingreaterdetailSothatswhyIwouldliketotableallthisuntilthe4to
giveusachance toassimilate whatyouvedone and also togive the residents ofthe area a
chancetobecome aware ofthis either through wordofmouth oratleast over the television thatththisisgoingoutonthe4todiscussit
Mike Wardle We appreciatethat
Keefe Could Iask just aquick question
McDonald Okay
Keefe Could we get a just asthe nature ofyour development business Giveussomeideas of
what that is
Mike Wardle Ofthe typeof developmentactivities
Keefe Yeah
Mike Wardle Well anything thatwould goon this particular sitewould be neighborhoodorientedWeretalkingaboutservicetypeusesandBrightonCorporationinwellwedo
commercial wehave other projects going on in Minnesota Inthe Denver Colorado area and
ourheadquarters in Boise iswhere wehave we doa lotofresidential development as well as
probably oneofthe largest office parks in thatregion and sowe just have kindofwide ranging
interest and projectsgoing on in Minnesota
Keefe So neighborhoodservice iswhat yourelining up for this particular site is thata fair
statement
42
83
Planning Commission Meeting November20 2007
Mike Wardle Ofwhat theycould be
Keefe Well whats your intentions therefor that
Mike Wardle Well Iguess because wehave not yetfiledan application Ihave notmet withthstafftoreallydiscussthiswhichwewilldoIbelieveonthe5ofDecemberIwouldsimply
like tostate atthis point thatthey would be neighborhood oriented Not anythingofa regionalsenseorhighwaycommercialperse
Keefe Yeah
Mike Wardle Thankyou
Aanenson Andjust for the record then Chair members ofthe commission wellput just a short
responseback tothis application and whatwe believe is an appropriateprocessand youcanthcommentbacktothatonthe4
McDonald Okay And Iguesswith that with youragenda for Chapter 2 have we gottenas far
asyouwantedtoget
Aanenson Yes Unless theres anybody else thatwants tospeak on anyother issue thatspretty
much what wewant tocover tonight Wellhave the restofthe group We did put the regionalmallonbothmeetingsNotunderstandinghowmanypeoplemayormaynotshowupMore
people may show up
Keefe Ihave an additional question Just in terms ofnotification ofdowntownbusinesses It
probablydid make somesense andall thesedifferent places but
Aanenson Wevemade presentations atthe Chamber and stuff so Ithink wellgive youthat
information back toyouatthe next meeting Kind ofwhat wevedone todate More
specifically and wellprovide thattoyounext time
thMcDonaldThanatthispointthenonDecemberthe4 we will all oftheseitems that weve
discussed today will be opened for anycomments If theresanyone whohasntmade any that
we willcontinue tomove forward with theland useand thezoning and dodiscussionsatthat
time totry towrap up Chapter 2 With that wewill move onto ournext agenda itemwhich isthe
approval ofthe minutes
APPROVAL OF MINUTES Dillonmoved Thomasseconded toapprovethe verbatim
andsummary minutes ofthe Planning Commission meeting dated November6 2007as
presented All voted in favorand the motion carried unanimously with a vote of6 to0
COMMISSIONPRESENTATIONS None
Chairman McDonald adjourned the Planning Commission meeting at9 40 p m
43
84
Planning Commission Meeting November20 2007
SubmittedbyKate Aanenson
Community DevelopmentDirector
PreparedbyNann Opheim
44
85
CITY OF
CHANHASSEN
7700 Market Bou levard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
ib
MEMORANDUM
7 0
TO Paul Oehme Director of Public Works City Engineer
Alyson Fauske Assistant City Engineer it
December 10 2007
FROM
DATE
SUBJECT 2008 Street Reconstruction Project No 08 02 Accept Feasibility
Report and Call the Public Hearing
REQUESTED ACTION Simple majority vote required
City Council is recommended to accept the feasibility study for the 2008 Street
Improvement Project and call the public hearing for January 28 2008
BACKGROUND
On September 24 2007 City Council awarded the consultant contract to Kimley
Horn and Associates and authorized the preparationofthefeasibility study
A neighborhood meeting was held on November 14 2007 Eighty six 86 notices
were sent out for the meeting Approximately 40 residents attended the meeting
DISCUSSION
The City s pavement management program recommends that streets in the Laredo
Drive area be reconstructed in 2008 The City receives the most complaints about the
condition of Laredo Drive from residents and the traveling public then other
street in the system The public utilities in the area are old have had problems
and should be replaced or repaired Approximately 1 35 miles of stre are proposed
to be reconstructed The area for improvements include Laredo Drive Laredo Lane
Longview Circle Cimarron Circle and Highland Drive west of Laredo Drive
Street Improvements
All the streets are proposed to be reconstructed approximately the same width as the
existing streets Laredo Drive between West 78th Street and Saratoga Drive is
proposed to be built to a 36 foot wide urban street section StreetsfrPlllS ratOgaDrivetoFrontierTrailareproposedtobe31wideThestreetsareproposedtobe
urbanized and reconstructed with concrete curb and gutter Most streets currently
have bituminous curb and gutter Replacement of the existing sidewalk panels is
included in the project No additional sidewalk or trail improvements are included in
the project at this time No included in the project
The City of Chanhassen A growing community with clean lakes quality schools a channing downtown thriving businesses winding trails and beautiful parks A great place to live work and play86
Paul Oehme
2008 Street Reconstruction Project
December 10 2007
Page 2
Public Utilities
The reconstruction project will include the improvement or replacement of most
public utilities within the reconstruction project area The project includes
replacement and adding additional storm sewer to the streets Environmental
manholes are proposed with the project to help treat the runoff prior to discharging
into adjacent water bodies Because the street reconstruction area is built out typical
stormwater ponding in the area is limited
Staff has looked into constructing raingardens in the area to treat the street
stormwater runoff A raingarden is a relatively small area of plantings near the drain
spout of a building or paved area Rainwater or snow melt is routed to the garden
and filtered naturally by the plants and soils in the garden This filtration process
removes nutrients and pollutants By acting as a micro detention pond the
raingarden plants and soils provide an easy natural way of reducing the amount of
water that flows from rooftops lawns and driveways Then using the concept of
bioretention these gardens remove pollutants from storm water and help restore
natural infiltration Because of the tight soils street grades little right of way and
future maintenance concerns staff has not included raingardens in the project at this
time
Draintile is included in various areas along the street to pick up residential sump
pump water discharge and reduce the amount of groundwater in the street subgrade
Reducing the amount of groundwater in subsoils typically increases the pavement
strength
The watermain in this area is old cast iron pipe which has experienced numerous
breaks It is proposed to replace all the watermain with PVC watermain pipe Water
service pipes and curb stop boxes are proposed to be replaced
The sanitary sewer service has been televised and approximately 1000 of sanitary
sewer pipe is proposed to be replaced Most of the pipe proposed to be replaced is
old clay pipe that has off set joints cracks or infiltration problems By replacing this
pipe it is anticipated that the city will see reduction of inflowlinfiltration 1 1 This
reduction will be quantified and included in the City s MCES 1 1 surcharge reduction
plan for credits Along with the sanitary sewer pipe sanitary sewer services will be
replaced
Estimated Assessments
Per the City assessment practice forty percent 40 of the street costs are proposed
to be assessed to the benefiting property owners the City will be responsible for the
remaining 60 One hundred percent 100 of the utility costs will be paid for by
the respective enterprise funds The residential assessment is the same for all
benefiting residential properties The estimated assessment at this time is 7 075 00
and was calculated based on the residential areas The assessments will be
recalculated with actual bids and prior to the assessment hearing The street
G ENGIPUBLICI 2008 Projectsl08 0l 2008 Street ImprovementsI12 1O 07 accept feasibility call public hearing doc87
Paul Oehme
2008 Street Reconstruction Project
December 10 2007
Page 3
oversizing for 31 to 36 was not included in the residential assessment calculation
the City and commercial properties pick up the oversizing costs The preliminary
assessment is only for the residential equivalent street section
The costs for the improvements are proposed to be assessed to the benefiting
properties on a per unit basis Costs incurred by individual lots are 40 of the total
project cost for street improvements divided among 80 single family residential
property owners and 6 commercial property owners
The total assessment to benefiting properties is proposed as follows
Total Street Improvement
Assessable Portion of Cost
1 763400 x 40
Total assessment
1 763400
40
705400
705400
There are 80 residential and 6 commercial properties proposed to be assessed for the
street improvements The total assessable front footages for residential and
commercial properties were measured as a basis for determining the assessments on a
unit basis To determine each commercial equivalent front footage first an average
property area to average front footage ratio was determined for the residential
properties
Average Lot Area
Average Front Footage
Ratio
12 560 SF
8624 FF
145 64
The property area to total front footage ratio was then determined for each
commercial property
Apartment
Retail Center
Bank
Post Office
Fire Station
School
82 982 SF 949 FF
81 546 SF 579 FF
95 625 SF 885 FF
41 250 SF 595 FF
56 580 SF 597 FF
227 700 SF 1 320 FF
8744
140 84
108 05
69 33
94 77
172 50
The ratio calculated for the average residential property was divided by the ratio to
each commercial property to determine a Residential Factor
Example Calculation Apartment Ratio
Residential Ratio
8744 145 64
Residential Factor
8744
145 64
0 60
0 60
G ENGIPUBLlCI 2008 ProjeclS 08 01 2008 Street ImprovemenlS 12 1O 07 accept feasibility call public hearing doc88
Paul Oehme
2008 Street Reconstruction Project
December 10 2007
Page 4
This Residential Factor was then applied to the actual affected front footage for each
commercial property to determine an Equivalent Front Footage for each commercial
property
Example Calculation Apartment Front Footage
Residential Factor
514 FF x 0 60
Equivalent Front Footage
514 FF
0 60
308 59
308 59 FF
The table below calculates the Equivalent Front Footage for each commercial
property
Commercial Actual Affected Residential Equivalent Front
Property Front Footage Factor Footage
Apartment 514 0 60 308 59
Retail Center 243 0 97 234 98
Bank 255 0 74 189 18
Post Office 110 048 52 36
Fire Station 205 0 65 13 340
School 660 1 18 781 70
Total Commercial Equivalent Front Footage 1 700
The equivalent total front footage on the project was calculated to determine the
assessment rate per front foot for the project
Residential Front Footage
Equivalent Commercial Front Footage
Total Equivalent Front Footage
6 899 Feet
1 700 Feet
8 599 Feet
Total Assessable Amount
705400 8 599 Feet
705400
82 03FF
The proposed commercial assessment rate was calculated on a unit basis using the
average front footage for the residential properties
Average Residential Front Footage
Assessment Rate Per Front Foot
86 24 Feet x 82 03Front Foot
Residential Assessment Rate
8624 Feet
82 03Front Foot
7 075Unit
7 075Unit
The proposed commercial assessment rate was calculated on a unit basis using the
equivalent front footages for each commercial property
G ENGIPUBLIC2008ProjectsI08 012008 Street Improvemeutsll2 1O 07 acceptfeasibility call public hearing doc89
Paul Oehme
2008 Street Reconstruction Project
December 10 2007
Page 5
Example Calculation Apartment Equivalent FF
Assessment Rate
308 59 FF x 82 03
Apartment Assessment
308 59 FF
82 03FF
25 314
25 314IUnit
The table below calculates the Assessment Amount for each commercial property
Commercial Equivalent Front Residential Equivalent Front
Property Footage Factor Footage
Apartment 308 59 82 03 25 314
Retail Center 234 98 82 03 19 275
Bank 189 18 82 03 15 518
Post Office 52 36 82 03 4 295
Fire Station 13340 82 03 10 943
School 781 70 82 03 64123
Total Commercial Assessment 139 468
A summary of the proposed residential and commercial assessments is as follows
Total Residential Assessments
Total Commercial Assessments
Total Assessments
566 000
139468
705468
FUNDING
The estimated costs for the 2008 Street Improvements City Project 08 01 as
proposed in this feasibility study are detailed below The estimated project costs
include a 5 percent construction cost contingency and a 15 percent allowance for
indirect costs such as engineering administrative legal items and capitalized interest
Proposed Improvement Estimated Cost
Total Project Cost
1 801 000
389 600
100 700
617 100
2 908400
Street Improvements
Storm Sewer Improvements
Sanitary Sewer Improvements
Watermain Improvements
G ENGIPUBLlCI 2008 Projects108 012008 Street Improvements12 10 07 accept feasibility call public hearing doc90
Paul Oehme
2008 Street Reconstruction Project
December 10 2007
Page 6
Total Project Cost
Amount
1 598400
400 000
250 000
660 000
2 908400
Fundin2 Source
Revolving Assessment Fund assessments and City share
City Storm Sewer Utility Fund
City Sanitary Sewer Utility Fund
City Watermain Utility Fund
Note Some costs associated with the street improvements are proposed to be paid
for with utility funds because they are directly attributable to the utility
improvements
SCHEDULE
The following is the proposed project schedule
Accept Feasibility Study Call Public Hearing
Public Hearing Authorize Preparation of Plans and Specs
Approve Plans and Specifications Authorize Ad for Bid
Bid Opening
Assessment Hearing A ward Contract
Construction Start
Construction Completion
December 10 2007
January 28 2008
February 11 2008
March 14 2008
April 14 2008
May 2008
August 2008
RECOMMENDED MOTION
Based upon the analysis completed as a part of this report the proposed 2008 Street
Improvements City Project 08 01 are feasible necessary and cost effective
Move to accept the feasibility study for the 2008 Street Improvement Project and call
the public hearing for January 28 2008
Attachments Project Area Map
Preliminary Assessment Roll
G ENGIPUBLICI 2008 Projectsl08 01 2008 Street lmprovementsI12 1O 07 accept feasibility call public hearing doc91
Ill
4
fQ 5xo
0
O
2
3
6
9
1 8
roO
45 I I
13 1211 10
47 40
J
7 39 14 16 17U493815
50 37 t 34 33 J 18 19 20 21 23
J 1 35
51 36 1isI24
Chippewa CI 6
V 56 60
I L t 5 61 Del RIO Drive5562
II 73 63
arL 74 1 64
69 T I
20 fIverDrive
68 67
66
6 75 11 o
Q lh
1s
Del r 1la
Ul Ul
I i O
l
w
1 1
76th 51 I
5t Village Road
m
h
I c t GoneSlOOa
l II q
Q t OU7
a
Q5lcuil
L
Highland Drive
TraIl
LJ
0
85 i
a
Q
c
o
in
IIe I7686
c
g 1
84 1
77
83
82
81
ll
I II e
L1
L L
80
1 I
W 78th 5t
L
W 78th 5t
I I I
Chan View
78
79
II I I r I JI I
N 2008 Street Project
300
I Feet
300 150 0
November 5 2007
g erlg public 08 01 2008 Street Improvements MapslAssessment Map mxd92
CITY OF CHANHASSEN
2008 STREET IMPROVEMENTS
CITY PROJECT 08 01
PRELIMINARY ASSESSMENT ROLL
Parcel on Assessment
Map PID Owner Site Address Amount
1 258200160 FELIX LOIS WHITE 7306 LAREDO DR 7 075 00
2 258200150 STEPHEN T REBECCA L CHEPOKAS 7304 LAREDO DR 7 075 00
3 258200140 RICHARD DEBORAH LLOYD 7302 LAREDO DR 7 075 00
4 258200130 ALAN ANNABEL FOX 7300 LAREDO DR 7 075 00
5 258200120 RICHARD J EUNICE M PETERS 7301 LAREDO DR 7 075 00
6 254420020 DAVID M JOANNA POINAR 7303 LAREDO DR 7 075 00
7 254420010 JOHN J JULIE C BUTCHER 7299 LAREDO DR 7 075 00
8 258200100 GERALD JANET 0 PAULSEN 7305 LAREDO DR 7 075 00
9 258200090 RONALD V ANN L KLEVE 7307 LAREDO DR 7 075 00
10 258810010 PETER 0 JILL M SCHMIDT 500 HIGHLAND DR 7 075 00
11 258810020 JAMES C KATHRYN C MURPHY 502 HIGHLAND DR 7 075 00
12 258810030 LADINN SANG M HAK 504 HIGHLAND DR 7 075 00
13 258810040 PAUL L TERRY L SNETTING 506 HIGHLAND DR 7 075 00
14 258810050 EUGENE A JANE F FOURNIER 507 HIGHLAND DR 7 075 00
15 258810060 CONRAD ODELIA WINKEL 505 HIGHLAND DR 7 075 00
16 258810070 RICHARD SANDRA M VADNAIS 503 HIGHLAND DR 7 075 00
17 258810080 STEVEN M CAUDILL 501 HIGHLAND DR 7 075 00
18 258810170 GEORGE LEAH LUCAS 410 CIMARRON CIR 7 075 00
19 258810180 WILLIAM C FLORA M DICKENSON 408 CIMARRON CIR 7 075 00
20 258810190 BARBARA A EDESKUTY 406 CIMARRON CIR 7 075 00
21 258810200 PATRICK 0 BARBARA E MURPHY 404 CIMARRON CIR 7 075 00
22 258810210 CHRISTOPHER R OLSON 402 CIMARRON CIR 7 075 00
23 258810220 LARRY JUDITH ANDERSON 400 CIMARRON CIR 7 075 00
24 258810250 JAMES M DENISE A VANASTEN 401 CIMARRON CIR 7 075 00
25 258810260 DALE I M LAMPA 403 CIMARRON CIR 7 075 00
26 258810270 RICHARD PATRICIA A WRASE 405 CIMARRON CIR 7 075 00
27 258810280 DAVID LORENA MESEDAHL 407 CIMARRON CIR 7 075 00
28 258810290 QUINN J MCLAIN RENEE S BERG 409 CIMARRON CIR 7 075 00
29 258810300 BARBARA LEE KASPER 411 CIMARRON CIR 7 075 00
30 258810310 JACOB BRANDY ANFANG 413 CIMARRON CIR 7 075 00
93
Parcel on Assessment
Map PID Owner Site Address Amount
31 258810320 BONNIE J GAMLlN 7405 LAREDO DR 7 075 00
32 258810330 BRENT A KIMBERLY A MAHER 7407 LAREDO DR 7 075 00
33 258810090 ALBERT S DIANNE R PRENTICE 7402 LAREDO DR 7 075 00
34 258810100 THOMAS VALERIE A MCCARTHY 7404 LAREDO DR 7 075 00
35 258810110 KELLY A NEWMANN 7406 LAREDO DR 7 075 00
36 258820010 RICHARD D ZELLNER 7461 LONGVIEW CIR 7 075 00
37 258820020 STEPHEN M SUSAN R SAUTER 7441 LONGVIEW CIR 7 075 00
38 258820030 RICHARD ALLEN GAYEN J COOK 7421 LONGVIEW CIR 7 075 00
39 258820040 JOHN L GOSNEY ELEANOR R DEAN 7401 LONGVIEW CIR 7 075 00
40 258820050 EDWARD L LINDA J GINSBACH 7381 LONGVIEW CIR 7 075 00
41 258820060 ROBERT J LOU ANN SAVOYSKI 7367 LONGVIEW CIR 7 075 00
42 258230010 DWIGHT 0 ROSEMARIE KONING 7361 LONGVIEW CIR 7 075 00
43 258230020 MICHAEL K SHERI K BRUNS 7321 LONGVIEW CIR 7 075 00
44 258230040 LEE THORSON 7320 LONGVIEW CIR 7 075 00
45 258230050 CHARLES JEAN ROBBINS 7340 LONGVIEW CIR 7 075 00
46 258820130 JERROLD L PETERSON SARA A GEISER PETERSON 7360 LONGVIEW CIR 7 075 00
47 258820120 RICHARD JANET CLEVELAND 7380 LONGVIEW CIR 7 075 00
48 258820110 TIMOTHY SUSAN THOMPSON 7400 LONGVIEW CIR 7 075 00
49 258820100 RALPH TANJA L KATIEB 7420 LONGVIEW CIR 7 075 00
50 258820090 DAVID L KAREN M RICE 7440 LONGVIEW CIR 7 075 00
51 258820080 JAMES J DEENA M WASSENBERG 7460 LONGVIEW CIR 7 075 00
52 258820070 ROBERT W BARBARA L MCCURDY 7480 LONGVIEW CIR 7 075 00
53 253900010 DAVID ROYAL EVAVOLD JACQUELINE KAY EVAVOLD 501 LAREDO LN 7 075 00
54 253900020 JOHN R JR PAULA A BRADEN 502 LAREDO LN 7 075 00
55 253900030 ROBERT G DIANNE M WICHTERMAN 503 LAREDO LN 7 075 00
56 253900040 JEFFREY D CHRISTINA A STURM 504 LAREDO LN 7 075 00
57 253900050 SHAWN KELLY HAWS 505 LAREDO LN 7 075 00
58 253900060 STEPHEN TERSTEEG JR 506 LAREDO LN 7 075 00
59 253900070 DAVID F JANICE KROME 507 LAREDO LN 7 075 00
60 25390080 PATRICIA A OBERG RANDALL 0 DAHLK 508 LAREDO LN 7 075 00
61 253900090 BRIAN J SEMIRA MELISSA L CARON SEMIRA 509 LAREDO LN 7 075 00
62 253900100 JENNIFER J CLARK 510 LAREDO LN 7 075 00
63 253900110 DAVID SHERMAN AMPAI JOHNSON 511 LAREDO LN 7 075 00
64 253900120 JUSTIN MERILEN BIKERS 512 LAREDO LN 7 075 00
65 253900130 KATHERINE ROALSTAD 513 LAREDO LN 7 075 00
66 253900140 JAMES L TERRI BUKER 514 LAREDO LN 7 075 00
94
Parcel on Assessment
Map PID Owner Site Address Amount
67 253900150 CRAIG R CATHLEEN BURD 515 LAREDO LN 7 075 00
68 253900160 JOHN J KATHLEEN HAGEDORN 516 LAREDO LN 7 075 00
69 253900170 EDWARD D JEANNE D WASLOSKY 517 LAREDO LN 7 075 00
70 253900180 THOMAS ELEANOR J KOTTKE 518 LAREDO LN 7 075 00
71 253900190 CRAIG LARIE ANDERSON 519 LAREDO LN 7 075 00
72 253900200 SCOTT REBECCA M RUNQUIST 520 LAREDO LN 7 075 00
73 253900210 FRANCES VALDIVIA 521 LAREDO LN 7 075 00
74 257600140 CHRISTINA M THIELBAR 7510 LAREDO DR 7 075 00
75 257620020 DOUGLAS M HANSEN 621 SANTA VERA DR 25 314 00
76 250125200 IND SCHOOL DIST 112 7600 LAREDO DR 64 23 00
77 250122100 CITY OF CHANHASSEN 7610 LAREDO DR 10 943 00
78 250122000 RICHARD W STEINER JR 7730 LAREDO DR 4 295 00
79 250122200 STATE BANK OF CHANHASSEN 600 78TH ST W 15 518 00
80 251720010 CHANHASSEN RETAIL L TD PRTSHP 586 78TH ST W 19 275 00
81 257900360 JODY R BUNKELMAN CONNIE L BUNKELMAN 7615 LAREDO DR 7 075 00
82 257900370 SHARON L EISCHENS 7613 LAREDO DR 7 075 00
83 257900380 WILLIAM D REMINGTON JEANETTE M TRIPP 7611 LAREDO DR 7 075 00
84 257900390 CHARLES F L1TTFIN 7609 LAREDO DR 7 075 00
85 257900400 ANTHONY M PATRICIA PIERI 7607 LAREDO DR 7 975 00
86 257900410 DEBRA L ANDERSON 7605 LAREDO DR 7 075 00
ASSESSMENT TOTAL 705468 00
95
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
BUilding Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
wwwci chanhassen mn us
MEMORANDUM
TO Todd Gerhardt City Manager
FROM 0PaulOehmeDirectorofPublicWorksCityEngineer
DATE December 10 2007 ot
SUBJ Lyman Boulevard Improvement Project No 06 03 Approval of
Agreement
BACKGROUND
At the November 13 2007 Council work session staff reviewed the agreements
with Council and discussed the improvements to Lyman Boulevard for Phase 1
AGREEMENT BACKGROUND
In May 1994 the City entered into a Master
County and the City of Chaska for future funding
improvements in eastern Carver County
to use tax increment financing TIP to fund
have all the roadways upgraded by 1998
roadways were completed
Powers Boulevard south ofTH 5 to Lyman
Galpin Boulevard south of TH 5 to Lyman
Audubon Road south of Lyman Boulevard to
The only segment that was not completed is
Boulevard to TH 41 Now that the City no longer
Carver County have been discussing a new
TH 41 to Powers Boulevard The attached new
cost participation for the future improvements
For Phase 1 improvement Galpin Boulevard to Audubon School
District 112 would contribute 1 000 000 for their share of the improvements to
Lyman Chaska would contribute 10 for their share of the improvements while
Carver County and Chanhassen would be responsible for 40 ofthep911strllctipl1
costs For Phases II and III Carver County and Chanhassen would be responsible
for 45 of construction cost Chaska would be responsible for 10 of the costs
for all three phases The reason Chaska is paying only 10 is because they paid
for all of the Audubon Roadi proY Il1 ts fr 9mPioIleer Trail to Lyman
Boulevard even though half of the roadway is located in Chanhassen The Cities
would be charged 20 of the construction costs for engineering
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play96
Todd Gerhardt
Lyman Boulevard Approve Agreement
December 10 1007
Page 2
Acquisition of the right of way will be the responsibility of the Cities It would
be the responsibility of the affected City with regard to each needed parcel to
acquire all permanent and or temporary rights of way necessary for the roadway
and for any trails in its jurisdiction It is estimated that about 5 8 acres of property
will be needed for the first phase improvements The acquisition costs would be
at the same contribution rates as for construction
PHASE 1 CONSTRUCTION
Currently Carver County is working on final design construction plans for Lyman
Boulevard for Galpin Boulevard to Audubon Road South CSAH 15 The project
will widen Lyman Boulevard from a 2 lane rural section to a 4 lane urban
divided roadway section with turn lanes and signals to accommodate the
anticipated future traffic for the corridor A bid date of May 2008 is planned with
construction starting in June 2008 and final completion in 2009 The project is
proposed at this time to accommodate the increased traffic on Lyman Boulevard
projected from the Chanhassen High School
A pedestrian underpass is proposed under Lyman Boulevard between Audubon
Road North and South This underpass is a critical connection for the City s trail
system It will connect the new development areas south of Lyman Boulevard in
the 2005 MUSA to the existing trail system north of Lyman Boulevard and to the
High School A trail is included in the project on the north side of Lyman
Boulevard from Galpin Boulevard to Audubon Road North
A new crossing for the Twin Cities and Western Railroad is proposed to match
the new roadway section New crossing guard arms roadway approaches and
sensors will be installed A signal preemption system will be installed when a
train is approaching so the intersection can be cleared
A 16 trunk watermain will be installed from Galpin Boulevard to Audubon Road
South in conjunction with the High School improvements The watermain will be
installed in the Lyman Boulevard right of way A 16 trunk watermain from
Audubon Road South to Audubon Road North is proposed to be installed in
conjunction with the Lyman Boulevard improvement project to complete the
trunk watermain looping system under Phase 1 A portion of the cost for the
trunk watermain is proposed to be charged back to the future development
Watermain and sewer services are proposed to be stubbed to the Holasek
property These costs are proposed to be added to the connection charges when
the property develops Due to the schedule of the project assessing the properties
at this time would be problematic
At the November 13 2007 work session the Council directed staff to investigate
if a roundabout would be a better option then a signal A roundabout is a one way
circular intersection without traffic signal equipment in which traffic flows around
a center island
g eng public2006 projects 06 03 lyman imp powers to th 41 121007 approve agreement doc97
Todd Gerhardt
Lyman Boulevard Approve Agreement
December 10 1007
Page 3
Unlike traffic circles from years ago a modern roundabout can provide safe and
effident traffic flow It operates with yield control at the entry points and gives
priority to vehicles within the roundabout Roundabouts can reduce serious traffic
accidents and they eliminate the cost of signal equipment and electric energy
costs to run them Over 30 roundabouts have been built in Minnesota to date
However for a roundabout to function properly a lot of engineering work and
study needs to be complete The only intersection in Phase 1 of the project that
could be built with a roundabout is at the Galpin Boulevard intersection From
preliminary traffic review of the intersection a 2 lane roundabout would need to
be built to handle the volume of traffic on Lyman Boulevard Most roundabouts
that have been built in the Minnesota are one lane Staff has only been able to
find one 2 lane roundabout built in Minnesota which has recently opened at
Richfield Parkway 66th and 17th Avenue Richfield Two lane roundabouts are
a little more difficult to maneuver because merging in the roundabout takes place
A large educational campaign would be needed to educate the traveling public
how to drive a 2 lane roundabout The speed limit on Lyman Boulevard is
anticipated to be 45 mph going through a roundabout a vehicle s speed should be
15 to 20 mph Most Minnesota roundabouts are built in lower speed zones so the
difference between traveled speed and speed through a roundabout is small
Greater speed changes from traveled to roundabout speed can create problems If
a roundabout is built at Galpin Boulevard it may negatively affect the other
signals by the high school because the vehicles may platoon out of the roundabout
to the next intersection causing more delays along the corridor A roundabout
would save on signal installation costs and power however additional right of
way would need to be acquired Staff has discussed the feasibility of installing a
roundabout at the Galpin Boulevard intersection with traffic engineers and the
County An Intersection Control Evaluation ICE report has been completed for
this intersection which recommends a traffic signal over a roundabout Staff does
not recommend construction a roundabout at the Galpin Boulevard intersection
based on our research the ICE report and comments from other traffic
professionals
FUNDING
Funding for the 2008 project is proposed to come from several sources
The following is the proposed fund for the first phase of the project School
District 112 will be contributing 1 000 000 to the construction project and will
be dedicating land The land value dedicated is not included in the costs It is
assumed that MnDOT will allow Chanhassen s Municipal State Aid MSA funds
to be advanced three years and used on an off system corridor
g eng public 2006 projects 06 03 lyman imp powers to th 41 121007 approve agreementdoc98
Todd Gerhardt
Lyman Boulevard Approve Agreement
December 10 1007
Page 4
Arterial Collector Development Fund
Revolving Assessment Fundi Abatement Funds
MSA
Other Agencies County Chaska School
District
Park Dedication Fund
Surface Water Utility Fund
Water Utility Fund
Sanitary Sewer Utility Fund
Total Project Cost
250 000
400 000
1 243 000
5457 000
500 000
800 000
250 000
50 000
8 950 000
Cost estimates for future phases are identified in the 2008 Capital Improvements
Program worksheet
Attachments
g eng public 2006 projects 06 03 Iyman imp powers to th 41 121007 approve agreementdoc99
Capital Improvement Program
City of Chanhassen MN
ST 003Ploject
2008 thru 2012
Contaet Unassigned
Department Street Improvements
Account 1
Project Name Lyman Boulevard Improvements
Type Improvement
Useful Life Unassigned
Category
Priority nfa
Account 2
Account 3
Total Project Cost 19 850 000
Description I
The city will need to participate in the reconstruction of Lyman Boulevard between Powers Boulevard and TH 41 The street segment is proposed
to be widened and urbanized to accommodate increased traffic volume from TH 212 new developments in the area and the new Chanhassen highschoolImprovementsincluderoadwaywideningsignalsstormsewerimprovementstrailimprovementandtrunkwatennainimprovementPhaseI2008ImprovementsincludetheroadwaysectionfromGalpinBlvdtoAudubonsouth
Phase 1I 20 I 0 Improvements are from Audubon south to Powers Blvd
Phase II 20 2 Improvements are from Galpin Blvd to TH 41
Justification I
To improve safety and mobility along the corridor
Expenditures
Construction
Total
2008
8 950 000
8 950 000
2009 2010
5 300 000
5 300 000
2011 2012
5 600 000
5 600 000
Total
19 850 000
19 850 000
Funding Sources
Arterial Collector Dvlpmnt Fee
AssessmentRevolving Assess
MSA
Other Agency Contribution
Park Dedication Fund
Sewer Utility Fund
Surface Water Utility Fund
Water Utility Fund
2008 2009 2010 2011
250 000 1 000 000
400 000
1 243 000 490 000
5457 000 2 710 000
500 000 350 000
50 000 50 000
800 000 450 000
250 000 250 000
8 950 000 5 300 000
2012
1 844 000
3 506 000
250 000
Total
1 250 000
400 000
3 577 000
11 673 000
850 000
100 000
1 500 000
500 000
100
NEW MASTER AGREEMENT
THIS JOINT POWERS AGREEMENT REGARDING the improvement of certain roadways in
Carver County the Joint Powers Agreement is made effective 2007 by and
between the City of Chanhassen a municipal corporation under the laws of Minnesota
Chanhassen the City of Chaska a municipal corporation under the laws of Minnesota
Chaska the County of Carver a body corporate and politic under the laws of Minnesota
Carver County and ISD 112 ISD 112
RECITALS
WHEREAS the parties recognize the need for certain highway improvements in eastern Carver
County and
WHEREAS a plan has been developed for constructing the needed highway improvements
which plan is contained in a document entitled Eastern Carver County Transportation Study
and
WHEREAS Chaska Chanhassen and Carver County had entered into an agreement dated
May 24 1994 to implement the identified highway improvements and
WHEREAS Chaska Chanhassen and Carver County desire to terminate the May 24 1994
agreement and enter into this New Master Agreement regarding the priQrity timing and
financing of the remaining improvements identified in the Eastern Carver County
Transportation Study and
WHEREAS ISD 112 is desirous of becoming a party to this New Master Agreement and
Chaska Chanhassen and Carver County agree that ISD 112 should be a party to the New
Master Agreement
WHEREAS Minnesota Statutes Sections 471 59 and 471 656 as amended collectively the
Joint Powers Act provides that two or more governmental units by agreement entered into
through action of their governing bodies may jointly or cooperatively exercise any power
common to the contracting parties or any similar powers and that the agreement may provide for
the exercise of such powers by one or more of the participating governmental units on behalf of
the other participating units and
NOW THEREFORE in consideration of their mutual covenants and obligations the parties
hereto agree as follows
Section 1 Definitions
101
a County Road Improvements or Improvements means those roads or portions
thereof to be constructed or improved pursuant to this New Master Agreement
b Joint Powers Agreement means one of the distinct agreements entered into
subsequent to this New Master Agreement by Carver County and one or more of the
Cities and or ISD 112 relating to construction of a specific road project
c Lead Agency means the public body designated in each Joint Powers Agreement as
the entity primarily responsible for implementation of a specific road project The
Lead Agency may be Carver County one of the Cities or ISD 112 as agreed upon
by the parties in each Joint Powers Agreement
d New Master Agreement means this Joint Powers Agreement
e Section 1 Road Improvements shall mean those improvements to be constructed or
reconstructed pursuant to this Agreement as identified in Exhibit A attached hereto
f Section 2A Road Improvements shall mean those improvements to be constructed
or reconstructed pursuant to this Agreement as identified in Exhibit A attached
hereto
g Section 2B Road Improvements shall mean those improvements to be constructed
or reconstructed pursuant to this Agreement as identified in Exhibit A attached
hereto
h Chanhassen means the City of Chanhassen Minnesota
1 Chaska means the City of Chaska Minnesota
J County or Carver County means Carver County Minnesota
k ISD 112 means school distlict 112
Section 2 Termination of Agreement Chaska Chanhassen and Carver County agree that
the Agreement dated May 24 1994 is superceded and replaced by this New Master Agreement
upon the approval of this New Master Agreement by Chaska Chanhassen Carver County and
ISD 112
Section 3 Lead Agency Carver County shall be the lead agency for the Section 1 and
Section 2 road improvements described in this Agreement It shall be the responsibility of Carver
County to provide for the design of the road improvements described in this Agreement The
road improvements constructed within the Cities shall be of an urban design and provide for off
roadway trails Carver County may utilize its engineering staff or may hire consulting engineers
to accomplish the design work Carver County shall be responsible for obtaining any permits
licenses or approvals necessary to construct the designated roadway Chanhassen and Chaska
2
102
shall have the right to inspect review and approve the plans and specifications for the roadway
prior to the project being bid ISD 112 shall have the right to inspect review and approve the
plans and specifications only for the Section 1 Road Improvements being bid Carver County
shall be responsible for bidding the project according to law After receipt of the bids but prior
to award thereof Chanhassen and Chaska shall have the right to review the bids and to reject all
bids After receipt of the bids but prior to award thereof ISD 112 shall have the right to review
the bids and to reject the bids related to the Section 1 Road Improvements only If any party
wishes to reject all bids the party so desiring may do so by notifying the others in writing of its
intent and all bids shall be rejected in accordance with law All costs incurred in constructing and
engineering the designated road improvements including all engineering costs prior to any
rejection of all bids shall be financed in accordance with Section 6 of this Agreement
Section 4 Further Joint Powers Agreements Prior to constructing any roads described in
this New Master Agreement including Section 1 Section 2A and Section 2B improvements or
portions thereof Carver County Chanhassen and Chaska must agree upon and enter into further
Joint Powers Agreements specifying the details of that project
Section 5 Right of Way Acquisition ISD 112 shall dedicate to the County for roadway
purposes sufficient land from its parcel located at 2200 Lyman Boulevard Chanhassen
Minnesota to construct the designated road which fronts on the school district parcel for Section
1 The value of the land dedicated by ISD 112 for roadway purposes shall not be included in the
costs to be shared among the parties pursuant to Section 6 and 7 of this agreement Chanhassen
and Chaska shall dedicate all lands owned by the respective City and necessary for the
acquisition of right of way and other lands for roadway purposes The value of the land
dedicated by the respective City for roadway purposes shall not be included in the costs to be
shared among the parties pursuant to Section 5 6 and 7 of this agreement For the remaining
portions of Section 1 and Section 2A 1 it shall be the responsibility of the affected City or Cities
with regard to each such project to acquire all permanent and or temporary rights of way
necessary for the roadway and for any trails sidewalks and landscaping related thereto Such
acquisition shall be done by the City where the right of way is located The affected City or
Cities shall be responsible for ordeling their respective franchise holders to relocate the
necessary utilities Notwithstanding anything herein to the contrary the affected City or Cities
shall be responsible for removing its electrical transmission lines at its own expense
Chanhassen Chaska and Carver County agree to share in the costs including attorneys fees or
any award of costs or attorneys fees under Minnesota Statutes SS 117 031 and 117 036 for the
acquisition of right of way and other land needed for the Section 1 and Section 2A 1 Project in
the following proportional rate
Chanhassen 45
Carver County 45
Chaska 10
Chanhassen Chaska and Carver County agree to negotiate in good faith an additional
agreement for the shming of the costs and attorneys fees for the acquisition of right of way and
other land needed for the Section 2A and Section 2B Project
3
103
Section 6 Financing of Section 1 Improvements Chanhassen Chaska and Carver County
agree to pay for all Section 1 Road Improvements which are cunently estimated to cost
4 820 000 With respect to those costs the pmiies agree to the allocation and payment schedule
shown on Exhibit B attached hereto The parties acknowledge that the actual cost of the Section
1 Improvements will equal the aggregate of the bid amounts accepted by the parties including
the cost of any change orders and supplemental agreements subsequently agreed to by the
parties plus 20 of these costs for engineering Notwithstanding the foregoing that portion of
Section 1 Road Improvements to be paid by ISD 112 shall not exceed 1 000 000 If the total
cost of Section 1 Improvements exceed or are less than the estimated costs in Exhibit B the
Cities and Carver County shall be responsible for the excess costs or share in the savings in the
following proportional rate
Chanhassen 45
Carver County 45
Chaska 10
If the County elects to issue bonds to finance in whole or in part its obligation pursuant to this
Agreement and any of the other parties also choose to issue bonds to finance their respective
obligations in whole or in part the County may be the lead agency in issuing the bonds if so
agreed by the parties
Section 7 Financing of Section 2A and 2B Road Improvements Chanhassen
Chaska and Carver County agree to pay for all Section 2A and 2B Road Improvements which are
cunently estimated to cost 7 680 000 With respect to those costs Chanhassen Chaska and
Carver County agree to the allocation and payment schedule shown on Exhibit B attached hereto
In the event ISD 112 elects to contribute to the cost of Section 2A or 2B Improvements Exhibit
B will be revised and payments to be made by the County and the Cites shall be reduced in the
proportionate shares set forth in this section and Section 6 Chanhassen Chaska and Carver
County acknowledge that the actual cost of the Section 2A and 2B Improvements will equal the
aggregate of the bid amounts accepted by the parties including the cost of any change orders and
supplemental agreements subsequently agreed to by the parties plus 20 of these costs for
engineering The Cities and Carver County agree to fully finance the cost of Section 2A and 2B
Road Improvements for which each is responsible in accordance with Exhibit B unless a
different anangement is agreed upon in writing by all the parties If the total cost of Section 2A
or 2B Road Improvements exceed or are less than the estimated costs in Exhibit B the Cities and
Carver County shall be responsible for the excess costs or share in the savings in the following
proportional rate
Chanhassen 45
Carver County 45
Chaska 10
The County shall use its general revenues county state aid highway funds abatements
bonds or any other funds legally available to it for the purpose of meeting its financial
4
104
obligations under this agreement If the County elects to issue bonds to finance in whole or in
part its obligation pursuant to this Agreement and any of the other parties also choose to issue
bonds to finance their respective obligations in whole or in part the County may be the lead
agency in issuing the bonds if so agreed by the parties
Section 8 Project Delays and Modification of Funding Schedule The parties recognize
that the ability to maintain the schedule of the Section 1 and Section 2 Improvements is
contingent upon numerous factors including some which are beyond the control of any or all of
the parties The parties also recognize that it may become necessary or convenient to modify the
schedule of the Section 1 and or Section 2 Improvements in the future Whenever a Section 1 or
Section 2 improvement shall be postponed or delayed from the schedule set forth in Exhibit D
the patiies shall be allowed to postpone or delay their financial contributions for costs not yet
incun ed by a similar pe110d of time
Section 9 Indemnification and Insurance Pursuant to M S Sec 471 59 subd l a the
parties to this agreement and subsequent Joint Powers Agreements as discussed above shall not
be liable for the acts or omissions of the other governmental parties participating in the joint venture
unless the participating governmental unit has agreed in writing to be responsible for the acts or
omissions of another participating governmental unit Each party shall be liable for its own acts to the
extent provided by law and hereby agrees to indemnify hold harmless and defend the others
their officers and employees against any and all liability loss costs damages expenses claims
or actions including attorney s fees which the other its officers and employees may hereafter
sustain incur or be required to pay arising out of or by reason of any act or omission of the
party its agents servants or employees in the execution or performance or failure to adequately
perform its obligations pursuant to this Agreement
It is understood and agreed that each party s liability shall be limited by the provisions of
Minn Stat Chap466 andor other applicable law
If any party to this Agreement is not self insured each such party agrees that in order to
protect itself as well as the other parties under the indemnity provision set forth above it will at
all times during the term of this Agreement keep in force
A General Liability Insurance Policy with minimum limits of 1 000 000
combined single limit CSL with coverage pertaining to premises operations
In the event Combined Single Limits Coverage is not secured by the
contractor the following minimum limits apply
2 000 000 Aggregate
2 000 000 Products and Completed Operations Aggregate
1 000 000 Personal Injury and Adveliising Injury
1 000 000 Each Occun ence
100 000 Fire Damage Limit
5 000 Medical Expense
The policy should be written on an occunence basis and not a claims
made basis
B Automobile Liability Insurance including owned non owned and
hired vehicles in an amount not less than 1 000 000 combined single limit
CSL for total bodily injm1es and or damages arising from anyone
5
105
accident If automobiles are not used we must receive a letter from you
stating this
C Professional Liability Insurance when required in the minimum amount
of 1 000 000 combined single limit CSL In the event Combined Single
Limits Coverage is not secured by the Contractor the following minimum
limits apply
2 000 000 Aggregate
1 000 000 per Wrongful Act or Occurrence
D Excess Umbrella Liability Policy in the amount of 1 000 000 will be
additionally required if any of the above policies have lower limits than
stated
E Worker s Compensation Insurance
F Prior to the effective date of this Agreement and as a condition precedent
each party that is not self insured will furnish the other parties with an
original Certificate of Insurance listing each other party as an Additional
Insured in all coverage areas except Worker s Compensation
Section 10 Data Privacy Data Ownership
A Minnesota Government Data Practices Act Minn Stat Chap 13 and related statutes
All data collected created received maintained or disseminated in any form for any
purposes because of this Agreement is governed by the Minnesota Government Data
Practices Act Minn Stat Chap 13 and related statutes as amended the Minn Rules
implementing such Act as amended as well as Federal Regulations on data privacy The
person responsible for release of all data under this Agreement shall be identified by each
party
B Ownership
Ownership of all data prepared for or by the County whether having commercial value or
not shall remain with the County
Section 11 Records Availabilitv and Retention Pursuant to Minn Stat SI6C 05 Subd 5
the parties agree that each party the State Auditor or any of their duly authorized representatives
at any time during normal business hours and as often as they may reasonably deem necessary
shall have access to and the right to examine audit excerpt and transcribe any books
documents papers records et which are pertinent to the accounting practices and procedures of
the parties involving transactions relating to this Agreement The parties agree to maintain these
records for a period of six years from the date of termination of this Agreement
Section 12 Assignment No party may assign or transfer any rights or obligations under
this Agreement without the prior consent of the other Parties and a fully executed Assignment
Agreement executed and approved by the same parties who executed and approved this
Agreement or their successors
Section 13 Waiver If any Party fails to enforce any provision of this Agreement that
failure does not waive the provision or its right to enforce it
6
106
Section 14 Section Headings The section headings contained in this Agreement are for
reference purposes only and shall not affect the meaning or interpretation of this Agreement
Section 15 Severability If any provision of this Agreement shall be declared by any
court of competent jurisdiction to be illegal void or unenforceable all other provisions of this
Agreement shall not be affected and shall remain in full force and effect
Section 16 Counterparts This Agreement may be executed in any number of
counterparts each of which shall be deemed to be an original and all of which together shall be
deemed to be one and the same instrument
Section 17 Amendments Any amendment to this Agreement must be in writing and
will not be effective until it has been executed and approved by the same parties who executed
and approved the original Agreement or their successors in office or its Assigns under Section
11
Section 18 Complete Agreement This Agreement and the Exhibits attached hereto
represent the complete agreement of the parties hereto and shall supersede all previous and
contemporaneous negotiations cOlTespondence commitments agreements and understandings
of the parties with respect to the transactions contemplated hereby
Section 19 Venue Venue for all legal proceedings arising from this Agreement must be
in the appropriate state or federal COUlt with competent jurisdiction in Carver County Minnesota
Section 20 Third Parties This Agreement does not create any rights claims or benefits
inuring to any person that is not a party hereto nor create or establish any third party beneficiary
IN WITNESS WHEREOF the parties have caused this agreement to be executed on the day first
written above
County of Carver City of Chaska
Chairman Carver County Board Mayor City of Chaska
City of Chanhassen ISD 112
Mayor City of Chanhassen By
Its
7
107
I y
t
t
cp
pP
f r
d
FILs
M NO 1
J 6
ot Ijrrl
8 i 1Rfi
1
J tI f
11 I c
J 0 ml
1 W
J 1 u
l m
tlOI l
i fib i f
5 Itf 1
I I
N 10
0
1
j J L T I
dv
p00 j
i i
J 1 102781
Uf J
j Iifjfi
1 j
o JUbLi
nii
W
1
t
1 f 1 W f
c CARVER COUNTY
PUBUC WORKS
CSAH 18 HWY
JPA
41 to
Exhibit
CSAH
A
17 DIAIIN BY SAS
JIIT 06 25 07
PAGE 1 OF 2
9
108
JJA i
f i
Q
tL
IJ
1l
I L 1I1G J3SNn8os
E
J
Ql
J i
C
jcj
1id
t
lI
tE
I I I
i J J J f ua t
j
r r il f Oc
t ffi I RIC19
i i
0
100o1
i
1
c 18 HWY
JPA
41 to
Exhibit
CARVER COUNTY
PUBUC WORKS
d
D
CDCI
cZoiCent01
or
li e
CSAH
A
DRAIN BY SAS
ATE 06 25 07
PAGE 2 DF 2
17
10
109
EXHIBIT B
Cost Allocation Schedule
Exhibit B Lyman Boulevard Estimated Cost Allocation Schedule
As of 6 18 07
I Section 1 School Segment midway between CSAH 19 and the TC W RR to midway
between CSAH 15 Audobon Rd South and Audobon Rd North
Jurisdiction Contribution Abatement Total Percentage
Master
reement
Lyman
rridor s
General Cost Share
OJ School District
4 820 000
98 747 I 901 253 I 1 000 000 I Na
Section 1 Total Estimate
na
Section 1 Remaining Cost 3 820 000
2 Chanhassen 1 014 917 598 337 1 613 254 42 23 57 37
3 Carver County 1 014 917 950 829 1 965 746 51 46 32 63
4 Chaska 241 000 0 241 000 6 31 10 00
City County Contributions 2 270 834 1 549 166 3 820 000 100 00 100 00
Section 1 Totals 2 369 581 2450 419 4 820 000
II Section 2A Portion of corridor west of Section 1
Jurisdiction Contribution Abatement Total Percentage
Master
reement
Lyman
rridor s
General Cost Share
1 School District
2 Chanhassen 1 594 000 1 594 000 40 29 57 37
3 Carver County 1 594 000 1 594 000 40 29 32 63
4 Chaska 768 000 768 000 19 41 10 00
Section 2A Totals 3 956 000 0 3 956 000 100 00 100 00
III Section 28 Portion of corridor east of Section 1
Jurisdiction Contribution Abatement Total Percentage
Master
reement
Lyman
rridor s
General Cost Share
11
110
1 School District
2 Chanhassen 1 862 000 1 862 000 50 00 57 37
3 Carver County 1 862 000 1 862 000 50 00 32 63
4 Chaska 0 0 0 00 10 00
Section 2B Totals 3 724 000 0 3 724 000 100 00 100 00
IV Entire Corridor Summary
Master
General Cost Share reement
Lyman
Jurisdiction Contribution Abatement Total Percentage rridor s
1 School District 98 747 901 253 1 000 000 8 00
2 Chanhassen 4470 917 598 337 5 069 254 40 55 57 37
3 Carver County 4470 917 950 829 5 421 746 43 37 32 63
4 Chaska 1 009 000 0 1 009 000 8 07 10 00
Entire Corridor Totals 10 049 581 2450 419 12 500 000 100 00 100 00
Notes
a Costs include roadway construction and engineering including signals and railroad crossing
b School district dedicates needed right of way in front of their property
c All numbers are budget estimates
d s will be applied to final costs with the exception of the school district which is a fixed dollar contribution
e Funding sources are the responsibility of each individual jurisdiction
f The 621 000 cost shift from Chanhassen to Carver County as a result of
completion of the Powers to 101 segment is not included in the above s
12
111
Page 1 of 7
CSAH 18 Agreement
Carver County and the Cities of Chanhassen and Chaska
JOINT POWERS AGREEMENT
BETWEEN
CARVER COUNTY THE CITY OF CHANHASSEN
AND
THE CITY OF CHASKA
FOR CONSTRUCTION
OF
CSAH 18 LYMAN BLVD IMPROVEMENTS
THIS AGREEMENT made and entered into by and between the City of Chanhassen a
municipal corporation under the laws of Minnesota CChanhassen the City of Chaska a
municipal corporation under the laws of Minnesota Chaska and the County of Carver
a body corporate and politic under the laws of Minnesota County
WITNESSETH
WHEREAS the County Chaska and Chanhassen have been involved in discussions and
studies relating to the improvement of CSAH 18 Lyman Blvd within and through the
corporate limits of Chaska and Chanhassen extending from TH 41 to CSAH 17 Powers
Blvd and
WHEREAS CSAH 18 is under the jurisdiction of the County for purposes of maintenance and
improvements and
WHEREAS the parties recognize the need for certain highway improvements on CSAH 18
Lyman Blvd and
NOW THEREFORE pursuant to Minnesota Statutes Section 471 59 and in consideration of the
mutual covenants and promises hereinafter contained it is agreed by and between
Chaska Chanhassen and the County as follows
A That this agreement shall apply to the improvement of the portions of County State Aid
Highway 18 defined as the Project which will include Section 1 and Section 2A 1 as
described below
Section 1 CSAH 18 from a point approximately mid way between CSAH 19 and the
TC W RR to a point approximately mid way between CSAH 15 Audubon Rd S and
Audubon Rd N including the connections to CSAH 15 Hazeltine Lake Drive and other
accesses identified to be within the construction limits of the project
Section 2A 1 CSAH 18 from a point approximately 1 000 feet west of CSAH 19 to a
point approximately mid way between CSAH 19 and the TC W RR including the
connection to CSAH 19 and other accesses identified to be within the construction limits of
the project
112
Page 2 of 7
CSAH 18 Agreement
Carver County and the Cities of Chanhassen and Chaska
B The Project is to be constructed consistent with current State Aid Standards as a divided
urban street section with concrete curb and gutter in areas as mutually agreed upon
between the County Chaska and Chanhassen
C The County Engineer will be the project manager in charge of the Project
D Prosecution of the Project will be performed on the following basis
The County will
1 Prepare and complete or at the option of the County hire an engineering consultant
firm to prepare and complete the soil investigations for the design of the Project the
construction plans specifications and special provisions the estimate of construction
cost the permanent and temporary right of way drainage and slope acquisition
descriptions and the other tasks required to complete the design of the Project acquire
necessary permits and approvals from reviewing agencies and otherwise provide for the
construction of the project The City Engineer or its consultant may be used to assist
with the preparation and completion of the city drainage and utility plans and
specifications The County shall abide by Mn DOT standard specifications rules
and contract administration procedures
2 Act as the contracting agency for the construction of the Project in accordance with the
competitive bidding requirements of Minnesota Statutes Sections 471 345 and 375 21
3 Provide the necessary construction supervision surveying inspection and reporting
services required for construction approval by the Minnesota Department of
Transportation Office of State Aid Said services shall include keeping adequate records
to document the quality of construction and to substantiate pay quantities The County
can at the County s option contract with an engineering consultant to provide
construction inspection services
4 Obtain a City Council Resolution from Chaska and Chanhassen approving the
construction plans specifications and special provisions prior to advertising the Project
for bids
5 Obtain approvals from Chanhassen and Chaska for the award of a construction contract
for the Project The County may not award the construction contract until Chanhassen
and Chaska advise the County in writing of their approval
6 Maintain the Project open to inspection by Chanhassen s and Chaska s representatives
7 Obtain the written approval of the Chanhassen and or Chaska City Engineer for any
change in orders or supplemental agreements to the contract involving work in which
Chanhassen or Chaska is cost participating prior to the performance of such work
8 Upon Project completion the County shall be responsible for all roadway pavement
maintenance within County right of way
113
Page 3 of 7
CSAH 18 Agreement
Carver County and the Cities of Chanhassen and Chaska
Chanhassen and Chaska will
1 Hold a public hearing on the making of such improvements pursuant to Minnesota
Statutes Section 429 prior to the award of a contract for the project if Chanhassen or
Chaska chooses to assess a portion of its construction and or other costs
2 Prepare appraise and acquire all necessary permanent and temporary right of way
drainage easements and slope easements for the construction of all portions of the
project located within the corporate limits of the City
3 Be responsible for observing the installation of all municipal utilities to verify to its
satisfaction the installation of said utilities has been performed in accordance with its
policies procedures and the plans and specifications
E Project and other related construction costs including but not limited to the following shall
be shared as stipulated in the New Joint Powers Agreement between Chanhassen Chaska
ISD 112 and the County except as otherwise specifically provided
a Clearing and grubbing
b Removal and salvage
c Grading Base and Surfacing
d Curb and gutter
e Medians
f Retaining walls
g Turf establishment
h Pavement markings and signing
i Mobilization field office and traffic control
j Sidewalks and bikeways
k Mitigation required by state and federal permits
I Storm sewer and other drainage facilities
m Replacing and restoring fences and driveways
n Reconstructing or adjusting sanitary sewer storm sewer and detention ponds
watermains and appurtenances and intersection lighting due to roadway
construction
o Relocating or adjusting privately owned utilities when not performed at the expense
of the utility
p Landscaping
q Traffic signals and luminaires
H Chanhassen and Chaska agree that the County shall be the sole owner of all accompanying
documents including the original construction plans as builfj specifications and survey
notes
1 The method of financing the improvement Project shall be the prerogative of the County
Chanhassen and Chaska
114
Page 4 of 7
CSAH 18 Agreement
Carver County and the Cities of Chanhassen and Chaska
1 OTHER CONSTRUCTION COSTS
a Chanhassen and or Chaska will pay one hundred percent 100 of the final
construction costs for any pedestrian underpasses in their municipality
b Chanhassen and Chaska will pay one hundred percent 100 of the final
costs for municipal utilities including street lighting
c Chaska and Chanhassen will pay one hundred percent 100 of the costs
including attorneys fees or any award of costs or attorneys fees under
Minnesota Statutes SS 117 031 and 117 036 for the acquisition of right of
way and other land needed for the Section 1 and Section 2A l Project within
their respective corporate limits
d Costs that may be incurred by the Project for relocation or adjustments of
the Xcel Electrical Transmission Line east of CSAH 15 Audubon Rd shall be
considered a project cost for the purpose of cost sharing participation
e Costs that may be incurred by the Project for relocation or adjustments of
the Magellan Pipeline Company petroleum product pipeline shall be
considered a Project cost for the purpose of cost sharing participation
f Costs that may be incurred by the Project for improvements to the TC W
railroad crossing shall be considered a project cost for the purpose of cost
sharing participation
2 ENGINEERING COSTS
a Chaska will reimburse the County a total amount of 20 0 of Chaska s portion
of the Project construction costs as payment for engineering performed by the
County pursuant to this agreement
b Chanhassen will reimburse the County a total amount of 20 0 of Chanhassen s
portion of the Project construction costs as payment for engineering performed
by the County pursuant to this agreement
3 REIMBURSEMENTS
a During each month of the term for the construction project the County will bill
the City for its share of the construction and engineering costs The share of the
construction costs will be determined as stipulated in the New Joint Powers
Agreement between Chanhassen Chaska ISD 112 and the County included as
Exhibit A and sections E 1 1 Other Construction Costs and 1 2 Engineering Costs
herein
b Upon completion and final acceptance of the project receipt of a detailed listing
of the final actual construction and engineering costs the City will reimburse
the County within thirty 30 days for any balance due In the event the City
115
Page 5 of 7
CSAH 18 Agreement
Carver County and the Cities of Chanhassen and Chaska
deposit exceeds the actual final costs of the City share the County will refund
the City within thirty 30 days such overpayment
J Upon completion of the storm sewer and associated ponding facilities and final acceptance
of the improvements thereof Chaska and Chanhassen agree to maintain the storm sewer
and ponds on CSAH 18 within their respective corporate limits in accordance with County
policy and the requirements of the Watershed District s
K The County agrees to defend indemnify and hold harmless Chanhassen and Chaska
against any and all c1aimsr liability loss damage or expense arising under the provisions
of this Agreement and caused by or resulting from negligent acts or omissions of the
County and or those of County employees or agents
Chaska and Chanhassen agree to defend indemnify and hold harmless the County against
any and all claims Iiabilityr loss damage or expense arising under the provisions of this
Agreement and caused by or resulting from their negligent acts or omissions and or those
of their employees or agents
All parties to this agreement recognize that liability for any claims anslng under this
agreement are subject to the provisions of the Minnesota Municipal Tort Claims Law
Minnesota Statutes Chapter 466 In the event of any claims or actions filed against either
party nothing in this agreement shall be construed to allow a claimant to obtain separate
judgments or separate liability caps from the individual parties
It is hereby understood and agreed that any and all employees of the County and all other
persons employed by the County in the performance of the provisions of services
hereunder shall not be considered employees of the City and that any and all claims that
mayor might arise under the Workers Compensation Act of the State of Minnesota on
behalf of said employees while so engaged and any and all claims made by third parties
engaged in the performance of any of the provisions of services hereunder shall in no way
be the obligation or responsibility of the City
L Pursuant to Minnesota Statute Section 16C 05 Subd 5 the City agrees that the County
the State Auditor or any of their duly authorized representatives at any time during normal
business hours and as often as they may reasonably deem necessary shall have access to
and the right to examine audit excerpt and transcribe any books documents papersr
records etc which are pertinent to the accounting practices and procedures of the City
and involve transactions relating to this Agreement
City agrees to maintain these records for a period of six years from the date of termination
of this Agreement
M Pursuant to Minnesota Statute Section 16C 05 Subd 5 the County agrees that the City
the State Auditor or any of their duly authorized representatives at any time during normal
business hours and as often as they may reasonably deem necessary shall have access to
and the right to examiner audit excerpt and transcribe any booksr documentsr papers
recordsr etc which are pertinent to the accounting practices and procedures of the County
and involve transactions relating to this Agreement
116
Page 6 of 7
CSAH 18 Agreement
Carver County and the Cities of Chanhassen and Chaska
County agrees to maintain these records for a period of six years from the date of
termination of this Agreement
N During the performance of this Agreement the City and the County agree to the following
No person shall on the grounds of race color religion age sex disability marital status
public assistance status criminal record creed or national origin be excluded from full
employment right in participation in be denied the benefits of or be otherwise subjected
to discrimination under any and all applicable Federal and State laws against discrimination
O Each Party to this agreement reserves the right to withdraw from and cancel this
agreement within 30 days from the opening of bids for the project in the event either or
both parties consider any or all bids unsatisfactory the withdrawal from or cancellation of
the agreement to be accomplished by either or both parties within 30 days of opening of
bids by serving a written notice thereof upon the other unless this right is waived by both
parties in writing
P Each party agrees that any modification of this agreement will be in writing and will be
signed by the parties hereto
Q Each party understands the contract for this project is scheduled to be awarded in 2008
In the event the contract for this Project is not awarded in 2008 this contract shall be
subject to termination or renegotiation by written notice of one party to the other parties
IN TESTIMONY WHEREOF the parties hereto have caused these presents to be executed
City of Chanhassen County of Carver Minnesota
Mayor City of Chanhassen County Board Chair
Date Date
Attest Attest
City Administrator County Administrator
Date Date
Approved As To Form Approved As To Form
City Attorney County Attorney
Date Date
117
Page 7 of 7
CSAH 18 Agreement
Carver County and the Cities of Chanhassen and Chaska
City of Chaska
Mayor City of Chaska
Date
Attest
City Administrator
Date
Approved As To Form
City Attorney
Date
118
I
0 I
r
u
o
IT
j
O t a lij nh 4 J mum nn
i o 1 i Xr
i 9rJ I ii G
Q L i
I 0 y y r7Pv I I
1l I e c
W 1
o Preserve i f r J f ft6 j t
LJ j l fL L U i os 1 c 0 tii
0YJiJ 1 v J 7 0 1 1
f f 11J rr1 17 iI s F lfn
Cf
i
j 1 i J T l wl j
J t1 I ld ILJ 1 V 1 ltY f
h 0 ji f1GI j V
o V7fthasa3tfrkIJ1Lrr1
f
i l 71 I mParI J tr EJ r 04
1
111
r
1 11 J po t
o
o ff Y1x Du 1 f c
ii Il itI00IIIJIlk9VJ
0 o i I c J IrJ l o C A f
T 1 n Lltt J d ci I rt Ht l
0 ir 0 71 17JL f1 f1 nf
A H j U y c 1 7 fJ 3 r J 0
U B f J
l S I r rr Q t y
f
A c c va J ili tiLU1eJlrIX02116Jllc
JI k PC
I
l v 1 f Bluff re V 1
f
rc I 9tS I 05 i J vII
7 ff rrll
n Tr U oy r1 1 IfSO R J riJ c di 1 6Y
Y a II 01 1 J I FiC r G fL JTCl Wi I Vi
l I q jj 11 C k lk
d s l 7T Cl 1 l2 ilf
ff i i I ree n liW 1 r 0
I 1 i C r Zfl JJff J 1 L ill n dQ c x 1
f l r l I i rl 0 3IS L v 21 y I J r 7
II L 1 t tli J1Itc r rIQSe Jlft4 ijt h 1 j
r I r I J j IV V I fI l l k if1 exf O nifjliRJ7r1I
J 7 I k I 1 t fj ri 1d e 91 I f
l 1 l I e If ij I m3fJl1fiWicu
f L e r i7 l IY r Ei
Legend I u tL J Q c II P7 r
TJ 1@SignalsJjI L O C
r Pedestrian Underpass J I if Jo
Phase 1 f I r Q
Phase 2 OJt f Ititr
rj Phase 3 0 pp eJz WZr
I I 7 177 ti r JAfLoLJ1j111IIy
1
I
r
I
f
I
jll
Al
November 6 2007 G Eng JoJeen EngProjects PauJ LymanStImp
119
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
J J
al 17
MEMORANDUM
TO Todd Gerhardt City Manager
17 C
j
r
FROM Paul Oehme Dir Of Public Works City Engineer
DATE December 10 2007
SUBJ Wells 12 13 Project Nos 08 04 08 05 Approve Plans
Specifications Authorize Ad for Bids
BACKGROUND
On October 22 2007 Council authorized a consultant contract with Barr Engineering
Co for the improvements to Well Nos 12 and 13
On November 13 2007 staff held a neighborhood meeting for surrounding property
owners to learn about the project
DISCUSSION
Proposed Wells 12 and 13 are intended to replace the production capacity that was
lost last summer when Wells 5 and 6 failed When the project was authorized six
potential well site alternatives were identified for the new well locations Additional
well sites were considered preliminarily that were further away for the east water
treatment plant but these sites were ruled out at this time because of various reasons
including time constraints Barr Engineering Co developed constraints and ria to
compare the six sites that included completing a ground water model to predi he
interference between the proposed wells and existing Wells 2 and 10 and cost
estimates for each of the viable sites Alternatives 2 and 4 had the least amount of
well interference with the existing wells have the greatest potential fo cess and
are the most cost effective locations when compared based on total well ld yield
For this reason Alternatives 2 and 4 are proposed to be the sites for the new wells
Alternative 2 is proposed for Well 12 and Alternative 4 is proposed for Well 13
Based on the modeling work completed it is anticipated the two new wells will each
yield approximately 1 200 gpm
On November 13 2007 a neighborhood meeting was held at CityHallforresid nts
to learn about the projects and voice their concerns Preliminary site layouts were
displayed as well as pictures of an existing well site so residents would have a general
idea of what the finished project would look like Residents commented on the Well
12 site that they would like to see minimal new pavement added as part of the project
and they would like landscapingt6 15y npluaea in the project to soften the view of the
site as seen from the northeast side of Lotus Lake These comments have been
incorporated into the site design for Well 12
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play120
Todd Gerhardt
December 10 2007
Page 2
Well 12 is located near existing Lift Station No 12 This lift station is scheduled for
rehabilitation in 2009 In anticipation of that project the electrical transformer and
electrical cabinet installed for Well 12 will be sized accordingly to allow for it to be
used in the future for Lift Station No 12 This will allow for one control panel and
one transformer at the site rather than two of each
Well 13 received very few comments from residents Comments from residents did
include reducing the amount of the impacts to the park including saving as many
trees along Lake Drive as possible The City currently does not own the 25 strip of
land along Lake Drive which includes the tree line Staff is working with the owner
of this property to purchase the strip of property The purchase of the property is
recommended to save on costs for installation of the raw watermain have a better
hydraulic alignment of raw watermain and to give the Parks Department better
access to the park Staff hopes to have a purchase agreement for Council
consideration for this piece of property at the same time the award of construction
contract is considered by Council
The construction of Wells 12 and 13 will be bid as one project The watermain
required to connect the new wells to the water treatment plant will be bid as a
separate project The project layout is completed and work is proceeding on plans
and specifications for both projects
Funding for this project has been budgeted for in the 2008 Capital improvements
plan The current project estimate for the well projects is 1 250 000 640 000 for
Well 12 and 610 000 for Well 13 The current project estimate for the connecting
watermain is 560 000 Council should be aware that there is a significant amount of
uncertainty related to construction costs right now due to rapid price increases in
materials used in construction The cost estimates above have contingencies to
address this but the current fluctuations in prices are very difficult to predict
The anticipated schedule of the project is as follows
Advertise for Bids
Bid Opening
A ward Contract
Start Construction
Substantial Completion
December 17 2007
January 8 2008
January 14 2008
January 21 2008
May 2008
RECOMMENDATION
Staff recommends that City Council approve the plans and specifications and order
the ad for bids for City Project Nos 08 04 and 08 05
Attachments
g eng publie 2008 projeets 08 04 well no 12 121007 app plans spees doe121
Proposed Well 12
Lotus Lake Boat Landing
Example of electrical panel
Electrical panel and wellheadwill be
screened by trees and shrubs
Example of wellhead
Electrical panel and wellhead will be
accessed via a bituminous driveway
mTOF
IlUJjPISll
No new Muminous proposed
Natural Rock Retaining Wall
Example of electrical transformer
From a short distance the wellhead
and electrical panel will blend intothe
scenery
122
Proposed Well 13
Chanhassen Estates Park
Example of electrical panel
Electrical panel and wellhead will be
screened by trees and shrubs
Example of wellhead
The park green space will be restored
after construction
IlTIOf
lllIIlIlIJ
Example ofelectrical transformer
From a short distance the wellhead
and electrical panel will blend Into the
scenery
123
3
Capital Improvement Program
City of Chanhassen MN
2008 thnt 2012
Contact
Department Water System Improvements
Project W 047 Type Unassigned
Useful Life
Project Name Well 12 Improvements
Account 1
Account 2
Account 3
Category Utilities
Priority nfa
Total Project Cost 940 000
Description I
This well is proposed to replace the lost capacity of Well 5
Justification 1
To meet the peak summer irrigation demands of the city
Expenditures
Construction
2008
940 000
940 000
2009 2010 2011 2012 Total
940 000
940 000Total
Funding Sources
WciterUtility Fund
2008
940 000
940 000
2009 2010 2011 2012 Total
940 000
940 000Total
Operational Impm tOther 1
124
Capital Improvement Program 2008 thru 2012
City of Chanhassen MN
I Project W 044
ProJcct Name Well 13
Account 1 Account 3
Contact
Department Water System Improvements
Account 2
Type Unassigned
Useful Life
Catcgory Utilities
Priority nla
Description I
This well is proposed to replace the lost capacity of well 6
Total Project Cost 1 200 000
Justification I
To meet the peak summer irrigation demands of the city
Expenditures
Construction
2008
1 200 000
Total 1 200 000
2009 2010 2011 2012 Total
1 200 000
1 200 000
Funding Sources
Water Utility Fund
2008
1 200 000
Total 1 200 000
2009 2010 2011 2012 Total
1 200 000
1 200 000
Operational ImpactOther I
125
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
itillaW
MEMORANDUM
70
TO Paul Oehme Director of Public Works City Engineer Ii
FROM Gordy Stauff Engineering Tech IV Construction Manager
DATE December 10 2007 J
SUBJ Frontier 2nd Addition Project No 04 16 Accept Pond
Improvements
Staff has received a letter from Mr Charles Thiss of Charles Stinson Architects
requesting the City consider acceptance of the pond improvements in Frontier 2nd
Addition Staff has performed a walk through inspection and finds the
improvements acceptable for perpetual maintenance and ownership
It is therefore recommended that the City Council accept the pond improvements
in Frontier 2nd Addition
Attachments 1
2
Letter from Charles Thiss
Location map
c Charles Thiss Charles Stinson Architects
g eng projects fj frontier 2nd accept pond improvements 121007 doc
The City 01 Chanhassen A growing community with clean lakes quality schools a channing downtown thriving businesses winding trails and beautiful parks A great place to live work and play126
11 20 2007 12 27 FAX 141 002
v
CHARLES R STINSON ARCHITECTS
WWW CRSAACH COM
November 20 2007
Attcntion Gordy
City of Chanhasscn
7700 Market Blvd
Chanhasscn MN 55317
Re Letter of Credit Release
De r Gordy
We are formally requesting the retelse of the Letter of Credit for the Frontier Second Addition The
I etter of credit is approximately 15 000 Thank you for your immediate attention to matter
Sincerely
L
Cltarles Thiss
61952 473 9503 1i1952 473 4371 II INFO@CRSARCH COM
1830 MINNETONKA BOULEVARD DEEPHAVEN MN 55391 1
127
Precision Surveys Inc
3305 Garland Lane North
Plymouth MN 55447
October 8 2007
Re plat ofFrontier Second Addition
To Whom It May Concern
The irons have been placed on the above mentioned plat
Sincerely
Kim Reaume
7 7 r ro
tJa i
OCT 1 2007
128
FRONTIER 2ND ADDITION
LOCATION MAP
I 0 4 t I114121I
e R o e
u 0 o
iSPJJ r t ll 0
II l I Q
f h f0 0YIClslafOfJrJ
g6 f9
w l
r 11Ip p CC ill L
lO H 11 TJ I ro In
JL c n q tf Ln
L t v
WhS
gw rt w 0 cf L altouIvr1f201001uulJ
n 771h I n c
do DD io lPl9J r
CJ I InrrL6J Q It Bark
0 G
r 0 0
0 d b lA4
tJl 1 5WWo
W 78th 5t
t I rlI I r 1
N
A 129
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952227 1100
Fax 952 227 1110
Building Inspections
Phone 952227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952227 1125
Fax 952 227 1110
Web Site
WIIW ci chanhassen mn us
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Laurie Hokkanen Assistant City Manager JdJr
DATE December 10 2007 o
RE 2008 Law Enforcement Contract
BACKGROUND
Attached to this report is the proposed 2008 Contract for Police Services with
Carver County Sheriff s Office In following the practice established in the 2005
contract the City of Chanhassen will be contracting for full time equivalents
FTEs The proposed contract for 2008 will include 15 sworn officers divided
into the following structure
10 FTE Patrol Deputies @ 94 946 10
5 FTE Deputy Night Differential Pay @ 0 70 hr
949461 80
6419 00
2 FTE Patrol Corporals @ 96 386 18
2 FTE Corporal Night Differential @ 0 70 hr
192 772 36
2 567 60
1 FTE Liaison Sergeant @ 112 86440 112 86440
1 FTE Investigator @
Beginning May 1 2008
65 09745
1 FTE Patrol Deputy @94 946 1O
1 FTE Deputy Night Differential Pau @ 0 70 hr
Beginning September 1 2008
31 628 73
427 93
TOTAL 1 361 259 27
The night differential is required for any officers working a majority of their shift
after 3 00 pm
This proposed contract calls for two new officers in 2008 an Investigator
beginning May 1 2008 and a patrol deputy beginning September 1 2008
This contract represents an increase of 12 9 over the 2007 contract
The contract does not provide overtime which may be required to backfill
deputies during vacations or other leave periods or to provide staff for court
appearances The Sheriff s Office is recommending that the City plan for an
additional 65 000 00 in overtime
The City 01 Chanhassen A growing community with clean lakes quality schools a channing downtown thriving businesses winding trails and beautiful parks A great place to live work and play130
In addition to the contract amount the City of Chanhassen has historically
participated in the South West Metro Drug Task Force For 2008 the cost of
participation is 2100 same as 2005 and 2006 These costs are paid directly to
SWMDTF
RECOMMENDATION
Staff recommends that the Chanhassen City Council approve the attached contract
for police services with the Carver County Sheriff s Office in the amount of
1 361 259 27 for 2008 policing services This action requires a majority of the
city council for approval
131
2008 CONTRACT FOR POLICE SERVICES
City of Chanhassen
THIS AGREEMENT made and entered into this day of D ecemb6Y
2007 by and between the County of Carver through its Sheriff s Office hereinafter County
and the Cityrrownship of Chanhassen hereinafter Municipality and collectively known as
the parties
WHEREAS the Municipality desires to enter into a contract with the County whereby the
County will provide police services within the boundaries of the Municipality and
WHEREAS the County agrees to render such services upon the terms and conditions hereinafter
set forth and
WHEREAS said contract is authorized by Minn Stat Sec 471 59 436 05 and Minn Stat Sec
366 and 367
NOW THEREFORE it is agreed between the parties as follows
ARTICLE I
1 POLICE SERVICES The County agrees to provide police service within the corporate limits
of the Municipality to the extent and in the manner set forth below
1 1 Police services to be provided under this contract shall encompass those police duties and
functions which are the type statutorily deemed to be the responsibility of the local
communities
1 2 With input from the Municipality the County shall assign personnel as necessary
13 All matters incident to the performance of such service or the control of personnel
employed to render such service shall be and remain in the control of the County
14 In the event a dispute arises between the parties concerning the type of service to be
rendered or the manner in which such service is provided the County shall retain sole
discretion in determining a solution to said dispute i e re assignment of personnel
types of patrol level of service available and
1 5 The police services will be provided to the Municipality for the selected number of
contracted hours and or full time equivalent FTE personnel Such services shall not
include situations in which in the opinion of the County a police emergency occurs
which requires a different use of the personnel patrol vehicle equipment or the
performance of special details relating to police services It shall also not include the
enforcement of matters which are primarily administrative or regulatory in nature i e
zoning building code violations
132
ARTICLE II
1 SPECIAL EVENT OR ADDITIONAL SERVICES If the Municipality desires additional
police services over and above the hours and or FTE s contracted for in this Agreement the
municipality shall contact the Sheriff s Office contract manager or designee noted in this
agreement The County will invoice the Municipality for these additional services pursuant to
Minn Stat Sec 471 425
ARTICLE III
1 COOPERATION AMONG PARTIES It is hereby agreed that the parties and all of their
officials personnel agents and employees shall render full cooperation and assistance to each
other to facilitate the provision of the services selected herein
ARTICLE IV
1 PROVISION OF EQUIPMENT It is agreed that the County shall provide all necessary
labor supervision vehicle equipment and supplies to maintain and provide the police services
selected herein
2 OFFICE SPACE If an FTE is requested the Municipality shall provide office and work
space for the assigned personnel
3 FINANCIAL LIABILITY The Municipality does not assume liability for the direct payment
of any salaries wages or other compensation to personnel employed by the County to perform
the selected services It is agreed that all personnel shall be employees of the County and the
County shall be responsible for providing worker s compensation insurance and all other benefits
to which such personnel shall become entitled by reason of their employment with the County
4 MUTUAL INDEMNIFICATION Each party shall be liable for its own acts to the extent
provided by law and hereby agrees to indemnify hold harmless and defend the other its
personnel and employees against any and all liability loss costs damages expenses claims or
actions including attorney s fees which the other its personnel and employees may hereafter
sustain incur or be required to pay arising out of or by reason for any act or omission of the
party its agents servants or employees in the execution performance or failure to adequately
perform its obligations pursuant to this Contract Liability of the County or other Minnesota
political subdivisions shall be governed by the provisions of the Municipal Tort Claims Act
Minn Stat Ch 466 and other applicable laws
Subd 1a Liability a A governmental unit participating in a joint enterprise including
participation in a cooperative activity undertaken pursuant to this section or other law is not
liable for the acts or omissions of another governmental unit participating in the joint adventure
or joint enterprise unless the participating governmental unit has agreed in writing to be
responsible for the acts or omissions of another participating governmental unit
b For purposes of determining total liability damages the participating governmental units and
the joint board if one is established are considered a single governmental unit and the total
liability for the participating governmental units and the joint board if established shall not
exceed the limits on governmental liability for a single governmental unit as specified in section
3 736 or 4 66 04 subdivision 1 or as waived or extended by the joint board or all participating
governmental units under section 3 736 subdivision 8 or 471 981 This paragraph does not
protect a governmental unit from liability for its own independent act or omissions not directly
2
133
related to the joint activity
5 INSURANCE The County agrees that all insurance required to adequately cover vehicles
personnel and equipment used by the County in the provision of the selected services will be
provided by the County
ARTICLE V
1 TERM The term of this contract shall be January 1 2008 to December 31 2008
2 RATE For contract year 2008 the Sheriff s Office has presented the municipality with a
recommended police plan which includes the police contract rates
3 NOTICE
3 1 If the County does not desire to enter into a contract for police service for 2008 the
Municipality shall be so notified in writing six 6 months prior to the expiration of the
current contract
3 2 On or before August 15 of the current contract year the County shall notify the
Municipality of the police contract rates for the following year
3 3 The Municipality shall notify the County of its intention to contract for police services for
the following year no later than October 15 of the current contract year
34 In the event the Municipality shall fail to give notice as required above the County shall
presume the Municipality does not desire to enter into an agreement with the County for
police services
3 5 Notice under the above provisions shall be sent to
Sheriff s Contract Manager Municipality
Commander Jeff Enevold Todd Gerhardt Administrator
Carver County Sheriff s Office
606 4th Street East
City Of Chanhassen
7700 Market Blvd
Chanhassen MN 55317
952 227 1109
Chaska MN 55318
952 361 1203
j enevold@co carver mn us tgerhardt@ci chanhassen mn us
3
134
ARTICLE VI
MENU OF POLICE SERVICES
1 2008 POLICE STAFFING OPTIONS
1 1 HOURLY POLICE SERVICE OPTION
1 1 1 Deputy Sheriff @ 55 32 per hour For performing the services contemplated
herein the Municipality agrees to contract for a total of hours in 2008
for Deputy Sheriff services at the hourly rate of 55 32 per hour in the amount of
1 2 FULL TIME EQUIVALENT FTE PERSONNEL OPTION
1 2 1 FTE personnel are full time employees dedicated to the contract community The
FTE deputy s compensated time includes patrol training holidays vacation sick
leave and other benefited time The FTE deputy position is not automatically
backfilled when the deputy is away from patrol for the above types of compensated
time The FTE deputy cost includes salary benefits supervision administration
training clerical support insurance vehicle fuel equipment supplies and county
overhead The FTE costs do not include additional hours which are necessary for
court or filling a shift for a compensated day off If the Municipality requests
coverage for any compensated days off noted above it is recommended the
Municipality set aside a contingency for additional hours
Additional hours for Deputies will be billed at 43 69 Liaison Sergeant additional
time will be billed at 56 07 per hour
1 22 For Police Services the Municipality agrees to contract for the following Menu of
Police Service FTE s A night differential charge of 70 cents per hour will apply
for sworn FTE s working a majority of their shifts after 3 00 PM
10 FTE Patrol Deputy 949 461 80
5 FTE Night Differential 6 419 00
January 1 2008
2 FTE Patrol Corporal 192 772 36
2 FTE Night Differential 2 567 60
January 1 2008
1 FTE Liaison Sergeant 112 864 40
January 1 2008
1 FTE Investigator 65 097 45
May 1 2008
1 FTE Patrol Deputy 31 648 73
1 FTE Night Differential 427 93
September 1 2008
TOTAL MENU OF SERVICE FTE AMOUNTS 1 361 259 27
4
135
1 3 2008 COMMUNITY SERVICE OFFICER RESPONSE
1 3 1 For Community Service Officer CSO the Municipality agrees to contract for a
total of hours in 2008 for CSO services at the hourly rate of 29 87 per hour in
the amount of
1 3 2 The fee for a Community Service Officer to respond to a call in a non CSO
contracting community will be 89 64 which will be automatically invoiced
pursuant to Minn Stat Sec 471 425
2008 POLICE STAFFING OPTION TOTALS
HOURLY OPTION @ 5532 HR AMOUNT DUE N A
FIE OPTION AMOUNT DUE 1 361 259 27
CSO OPTION @ 29 87HR AMOUNT DUE N A
CSO PER CALL SERVICE OPTION @ 89 64 CALL N A
TOTAL AMOUNT DUE 1 361 259 27
2 PAYMENT
2 1 The Sheriff shall invoice one half of the total amount of the current year police
staffing option cost due hereunder or 680 629 63 to be paid on or before June 30 of
the current contract year The Sheriff shall invoice the remaining one half or
680 629 64 to be paid on or before November 30 of the current contract year
3 MINNESOTA STATE POLICE AID The County upon receiving the Minnesota State Police
Aid shall reimburse the Municipality its share pursuant to Minn Stat Sec 69 011
Minn Stat Sec 471425 Prompt payment of local government bills Subd 2 a For municipalities who
have governing boards which have regularly scheduled meetings at least once a month the standard
payment period is defined as within 35 days of the date of receipt
5
136
IN WITNESS THEREOF the Municipality has caused this agreement to be executed by its
Mayor and by the authority of its governing body on the day of 2007
MUNICIPALITY
By
Mayor
Date
By
City Clerk
Date
6
137
IN WITNESS THEREOF the County of Carver has caused this Agreement to be executed
by its Chair and attested by its Administrator pursuant to the authority of the Board of County
Commissioners on the day of 2007
APPROVED AS TO FORM
Carver County AttorneyDate
COUNTY OF CARVER
By
Chair
Carver County Board of Commissioners
Date
By
Byron Bud Olson Carver County Sheriff
Date
ATTEST
David Hemze County Administrator
Date
7
138
Attachment A
Carver County Sheriff s Office
City of Chanhassen 2008 Police Contract
The Sheriff s Office will
1 Provide 10 FIE town deputies to work 12 hour shifts January 01 through
December 31 2008
Total 949 461 80
a Night differential of 70 per hour for 5 FIE
Total 6 419 00
Provide 2 FIE patrol corporals to work 12 hour shifts January 01 through
December 31 2008
Total 192 772 36
b Night differential of 70 per hour for 2 Corporal FIE
Total 2 567 60
2 Provide 1 FIE sergeant liaison to work January 01 through December 31 2008
Monday through Friday from 9 00 AM 5 00 PM
Total 112 86440
3 Provide 1 FIE investigator to work May 1 2008 through December 31 2008
Total 65 09745
4 Provide 1 FIE patrol deputy to work Sept 1 2008 through December 31 2008
Total 31 648 40
a Night differential of 70 per hour for 1 Patrol FIE
Total 427 93
Total 2008 Police Contract 1 361 259 27
139
Note FIE Deputies are Full Time Equivalent personnel dedicated to the contract
community The FIE deputy s compensated time includes patrol training
holidays vacation sick leave and other benefited time The FTE deputy position
is not automatically backfilled when the deputy is away from patrol for the above
types of compensated time The FIE deputy cost includes salary benefits
supervision administration training clerical support insurance vehicle fuel
equipment supplies and county overhead The FIE costs do not include
additional hours which are necessary for court or filling a shift for a compensated
day off The City should anticipate some additional hours and budget
accordingly
If the County is not able to hire and train the needed FTE deputies as indicated
above it will credit the community accordingly
The community has also agreed to fund the South West Metro Drug Task
Force at a cost of 2 100 00 The City will be billed separately by the
SWMDTF
140
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952227 1110
Building Inspections
Phone 952227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
MEMORANDUM
TO Mayor City Council
FROM G SGregStichaFinanceDirector
DA TE December 10 2007
SUBJ Resolution Authorizing Early Retirement of Debt
BACKGROUND
As part of our annual review process with our financial advisors we have identified
three bond issues that can be retired early
The three issues are the 1999A GO Bonds the 2001B GO Improvement Bonds and
the 1998C Water Revenue Bonds In the case of the 1999A and 2001B issues there
is sufficient cash in the debt service funds to retire both of these issues early The
2001C Water Revenue Bonds are now callable as well and would produce a
sufficient interest cost savings to retire them early
The total interest cost savings these early retirements will produce is 38 000 Once
the resolution authorizing the early retirement of the debt is adopted the bond holders
will be notified and the debt will be retired on February 1 2008
RECOMMENDATION
Staff recommends that the City Council pass the attached resolution authorizing the
early retirement of the 1999A 2001B and 1998C bond issues
ATTACHMENT
1 Resolution
The City 01 Chanhassen A growing community with clean lakes quality schools a channing downtown thriving businesses winding trails and beautiful parks A great place to live work and play141
EXTRACT OF MINUTES OF A MEETING OF THE
CITY COUNCIL OF THE
CITY OF CHANHASSEN MINNESOTA
HELD December 10 2007
Pursuant to due call and notice thereof a regular meeting of the City Council of the City
of Chanhassen Carver and Hennepin Counties Minnesota was duly held at City Hall on
December 10 2007 at 7 00 p m for the purpose in part of authorizing the call of certain
outstanding General Obligation Bonds of the City
The following members were present
and the following were absent
Member introduced the following resolution and moved its adoption
RESOLUTION AUTHORIZING THE CALL OF CERTAIN
OUTSTANDING GENERAL OBLIGATION BONDS OF THE CITY
WHEREAS by Resolution duly adopted on May 26 1998 the 1998 Resolution the
City issued 820 000 original principal amount of General Obligation Water Revenue Bonds
Series 1998C dated June 1 1998 the 1998 Bonds The City has sufficient funds on hand in
the debt service account of the General Obligation Water Revenue Bonds Series 1998C Fund
the 1998 Fund to call the remaining 105 000 outstanding principal amount of the February
1 2009 maturity of the 1998 Bonds on February 1 2008 at a price of par plus accrued interest
WHEREAS by Resolution duly adopted on November 22 1999 the 1999 Resolution
the City issued 4 255 000 original principal amount of General Obligation Bonds Series
1999A dated December 1 1999 the 1999 Bonds The City has sufficient funds on hand in
the debt service account of the General Obligation Bonds Series 1999A Fund the 1999 Fund
to call the remaining 400 000 outstanding principal amount of the February 1 2009 2010
maturities of the 1999 Bonds on February 1 2008 at a price of par plus accrued interest
WHEREAS by Resolution duly adopted on June 25 2001 the 2001 Resolution the
City issued 640 000 original principal amount of General Obligation Improvement Bonds
Series 2001B dated July 15 2001 the 2001 Bonds The City has sufficient funds on hand in
the debt service account of the General Obligation Improvement Bonds Series 2001 Fund the
2001 Fund to call the remaining 160 000 outstanding principal amount of the February 1
2009 2010 maturities of the 2001 Bonds on February 1 2008 at a price of par plus accrued
interest
NOW THEREFORE be it resolved by the City Council of the City of Chanhassen
Minnesota as follows
2108627v I
142
1 01 The City Council hereby determines that there exists sufficient funds in the 1998
Fund to prepay on February 1 2008 105 000 aggregate principal amount of 1998 Bonds
maturing on February 1 of the year 2009 and the interest due thereon
1 02 The City Council hereby determines that there exists sufficient funds in the 1999
Fund to prepay on February 1 2008 400 000 aggregate principal amount of 1999 Bonds
maturing on February 1 of the years 2009 2010 and the interest due thereon
1 03 The City Council hereby determines that there exists sufficient funds in the 2001
Fund to prepay on February 1 2008 160 000 aggregate principal amount of 2001 Bonds
maturing on February 1 of the years 2009 2010 and the interest due thereon
1 04 US Bank National Association in St Paul Minnesota the bank at which
principal and interest on the Bonds are payable is hereby authorized and directed to cause the
Notices of Call for Redemption attached hereto as Exhibits A Band C to be given in accordance
with the provisions of the Resolution
1 05 No further action shall be required of the City Council to complete prepayment of
the Bonds
The motion for the adoption of the foregoing resolution was duly seconded by Member
and upon vote being taken thereon the following voted in favor thereof
and the following voted against the same
Whereupon the resolution was declared duly passed and adopted
2108627vl 2
143
STATE OF MINNESOTA
COUNTIES OF CARVER AND HENNEPIN
CITY OF CHANHASSEN
I the undersigned being the duly qualified and acting City Manager of the City of
Chanhassen Minnesota DO HEREBY CERTIFY that I have carefully compared the attached
and foregoing extract of minutes with the original thereof on file in my office and that the same
is a full true and complete transcript of the minutes of a meeting of the City Council duly called
and held on the date therein indicated insofar as such minutes relate to authorizing the call of
certain outstanding General Obligation Bonds of the City
WITNESS my hand officially on December 2007
City Manager
2108627vl 3
144
EXHIBIT A
NOTICE OF CALL FOR REDEMPTION
GENERAL OBLIGATION WATER REVENUE BONDS SERIES 1998C
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
NOTICE IS HEREBY GIVEN that by order of the City Council of the City of Chanhassen
Carver and Hennepin Counties Minnesota there have been called for redemption and
prepayment on
February 1 2008
those outstanding bonds of the City designated General Obligation Water Revenue Bonds Series
1998C dated June 1 1998 having a stated maturity date of 2009 and totaling 105 000 in
principal amount and having the CUSIP number listed below
Year CUSIP Number
2009
The bonds are being called at a price of par plus accrued interest to February 1 2008 on which
date all interest on the bonds will cease to accrue Holders of the bonds hereby called for
redemption are requested to present their bonds for payment at U S Bank National Association
formerly Firstar Bank of Minnesota N A Attention Paying Agent Services 60 Livingston
Avenue St Paul Minnesota 55107
Dated December 10 2007
BY ORDER OF THE CITY COUNCIL
CITY OF CHANHASSEN MINNESOTA
s Todd Gerhardt City Manager
The City shall not be responsible for the selection of or use of the CUSIP numbers nor is any
representation made as to their correctness indicated in the notice They are included solely
for the convenience of the holder
2108627vl A I
145
EXHIBIT B
NOTICE OF CALL FOR REDEMPTION
GENERAL OBLIGATION BONDS SERIES 1999A
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
NOTICE IS HEREBY GIVEN that by order of the City Council of the City of Chanhassen
Carver and Hennepin Counties Minnesota there have been called for redemption and
prepayment on
February 1 2008
those outstanding bonds of the City designated General Obligation Bonds Series 1999A dated
December 1 1999 having a stated maturity dates of 2009 and 2010 and totaling 400 000 in
principal amount and having the CUSIP number listed below
CUSIP NumberYear
2009
2010
The bonds are being called at a price of par plus accrued interest to February 1 2008 on which
date all interest on the bonds will cease to accrue Holders of the bonds hereby called for
redemption are requested to present their bonds for payment at U S Bank National Association
formerly Firstar Bank of Minnesota N A Attention Paying Agent Services 60 Livingston
Avenue St Paul Minnesota 55107
Dated December 10 2007
BY ORDER OF THE CITY COUNCIL
CITY OF CHANHASSEN MINNESOTA
s Todd Gerhardt City Manager
The City shall not be responsible for the selection of or use of the CUSIP numbers nor is any
representation made as to their correctness indicated in the notice They are included solely
for the convenience of the holder
2I08627vl B 1
146
EXHIBIT C
NOTICE OF CALL FOR REDEMPTION
GENERAL OBLIGATION IMPROVEMENT BONDS SERIES 2001B
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
NOTICE IS HEREBY GIVEN that by order of the City Council of the City of Chanhassen
Carver and Hennepin Counties Minnesota there have been called for redemption and
prepayment on
February 1 2008
those outstanding bonds of the City designated General Obligation Improvement Bonds Series
2001B dated July 15 2001 having a stated maturity dates of 2009 and 2010 and totaling
160 000 in principal amount and having the CUSIP number listed below
Year CUSIP Number
2009
2010
The bonds are being called at a price of par plus accrued interest to February 1 2008 on which
date all interest on the bonds will cease to accrue Holders of the bonds hereby called for
redemption are requested to present their bonds for payment at U S Bank National Association
Attn Paying Agent Services 60 Livingston Avenue S1 Paul Minnesota 55107
Dated December 10 2007
BY ORDER OF THE CITY COUNCIL
CITY OF CHANHASSEN MINNESOTA
s Todd Gerhardt City Manager
The City shall not be responsible for the selection of or use of the CUSIP numbers nor is any
representation made as to their correctness indicated in the notice They are included solely
for the convenience of the holder
2108627vl C l
147
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952227 1110
Building Inspections
Phone 952 227 1180
Fax 952227 1190
Engineering
Phone 952227 1160
Fax 952 227 1170
Finance
Phone 952227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952 2271310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
WNci chanhassen mn us
1
MEMORANDUM
TO Todd Gerhardt City Manger
FROM Angie Auseth Planner I
oMDATEDecember102007
SUBJ Adoption of Ordinance Amending Chapter 20 Zoning of the
Chanhassen City Code
ACTION REQUIRED
A simple majority vote of City Council members present is required to adopt the
amendment
BACKGROUND
Staff has brought these changes forward to provide a mechanism to allow roof
mounted antennas exceeding 15 feet in height on a temporary basis Sec 20 1515
1 Antennas mounted on roofs walls and existing towers and to provide
consistency with the tower and antenna design standards set forth previously in
Article XXX of this chapter Sec 20 1515 2 The proposed changes to Chapter
20 have been reviewed by the Chanhassen Planning Commission
SUMMARY
Staff believes that these changes address a deficiency in the City Code and
recommends approval of the amendment
PLANNING COMMISSION SUMMARY
The Planning Commission held a public hearing on November 20 2007 to review
the proposed amendments The Planning Commission voted 6 0 to approve the
amendments The summary and verbatim minutes are item la of the City Council
packet for December 10 2007
The only issue the Planning Commission had was with Sec 20 1515 2 Antennas
mounted on roofs walls and existing towers They felt the language for blending
the antenna into the building fac ade was too specific and that it should be expanded
to allow for camouflaging the antenna into the surrounding environment that will
best alleviate the visual impact of the antenna Staff has revised the language so it is
consistent with the Sec 20 1509 Tower and antenna design
The City 01 Chanhassen A growing community with clean lakes quality schools a chamning downtown thriving businesses winding trails and beautiful parks A great place to live work and play148
Mr Todd Gerhardt
December 10 2007
City Code Amendment Chapter 20
Page 2
RECOMMENDATION
Staff and the Planning Commission recommend approval of the following motion
The Chanhassen City Council approves adoption of the attached ordinance amending Chapter
20 Section 20 1515 of the Chanhassen City Code
ATTACHMENTS
1 Ordinance Amending Chapter 20 Chanhassen City Code Zoning
2 Staff Report Dated November 20 2007
g plan bg city codemovember 2007 revisions cc memo 20 dec 10 2007 doc
149
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
ORDINANCE NO
AN ORDINANCE AMENDING CHAPTER 20
CHANHASSEN CITY CODE
ZONING
THE CITY COUNCIL OF THE CITY OF CHANHASSEN MINNESOTA ORDAINS
Section 1 Section 20 1515 of the City Code City of Chanhassen Minnesota is hereby
amended to read as follows
The placement of wireless communication antennas on roofs walls and existing towers may be
administratively approved by the city provided that the antenna meets the requirements of this
Code and the following
1 The maximum height of an antenna shall not exceed 15 feet above the roof and shall be
set back at least 10 feet from the roof edge Antennas exceeding 15 feet above the roof
must be approved through the Interim Use Permit IUP Process
2 Wall or facade mounted antennas may not extend five feet above the cornice line and
shall be designed to blend into the surrounding environment through the use of color
camouflaging and architectural treatments
Section 2 This ordinance shall be effective immediately upon its passage and publication
PASSED AND ADOPTED this day of 2007 by the City
Council of the City of Chanhassen Minnesota
Todd Gerhardt City Manager Thomas A Furlong Mayor
Published in the Chanhassen Villager on
g plan bg city codenovember 2007 revisionsamendment ordinance ch 20 antennas doc
1
150
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952227 1110
Building Inspections
Phone 952227 1180
Fax 952227 1190
Engineering
Phone 952 227 1160
Fax 952227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
w
MEMORANDUM
TO Planning Commission
FROM Angie Auseth Planner I
DATE November 20 2007
SUBJ Amendment to Chapter 20 Zoning of the Chanhassen City Code
The Planning Commission has review responsibility for Chapter 20 A public
hearing is required to make changes in this chapter We are requesting that the
Planning Commission review the proposed revisions to Chapter 20 and
recommend an ordinance amendment incorporating the changes
Staff has prepared a strike through delete and bold add format to review the
proposed changes
CHAPTER 20
ISSUE Staff received a request for a height variance for a temporary roof
mounted antenna While antennas are a permitted use in all districts they are
subject to the regulations outlined in Article XXX of Chapter 20
The request was for a 25 foot variance from the IS foot height maximum to
install a 40 foot mastantenna on top of a two story building The intent of the
antenna was for temporary use however granting of the variance would allow
permanent use of the antenna since a time limit cannot be a condition of a
variance To be able to permit antennas on a temporary basis exceeding the 15
foot height limitation Staff proposes the addition of the Interim Use Permit IUP
requirement to roof mounted antennas in excess of 15 feet in height All
freestanding towers require a Conditional Use Permit
Sec 20 1515 Antennas mounted on roofs walls and existing towers
The placement of wireless communication antennas on roofs walls and existing
towers may be administratively approved by the city provided that the antenna
meets the requirements of this Code and the following
1 The maximum height of an antenna shall not exceed 15 feet above the roof
and shall be set back at least ten feet from the roof edge Antennas exceeding 15
feet above the roof must be approved through the Interim Use Permit IUP
Process
2 Wall or facade mounted antennas may not extend five feet above the cornice
line and must be constructed of a material or color which mutches the exterior of
the building or structure shall be designed to blend into the surrounding
environment through the use of color camouflaging and architectural
treatments
The City of Chanhassen A growing community with clean lakes quality schools a channing downtown thriving businesses winding trails and beautiful parks A great place to live work and play151
Planning Commission
November 20 2007
Page 2 of 2
PROPOSED CHANGE Amend section 20 1515 1 to add Antennas exceeding 15 feet in
height shall require an Interim Use Permit Also amend 20 1515 2 to read shall be designed
to blend into the surrounding environment through the use of color camouflaging and
architectural treatments
RECOMMENDATION
Staff recommends that the Planning Commission adopt the following motion
The Chanhassen Planning Commission recommends that the City Council adopt the attached
ordinance amending Chapter 20 of the Chanhassen City Code
A TTACHMENTS
Ordinance Amending Chapter 20 Zoning
g plan bg city codenovember 2007 revisions pc memo antennas doc
152
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952227 1190
Engineering
Phone 952227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
j
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Angie Auseth Planner I
t9
December 10 2007DATE
SUBJ Rosemount Inc Interim Use Permit Request
Planning Case 07 25
EXECUTIVE SUMMARY
The applicant is requesting an Interim Use Permit UP to install a temporary 25 foot roof
mounted mast antenna for the purpose of Extended Range Wireless Sensor Network testing
The applicant originally requested a variance to exceed the IS foot height limitation above the
roof line of the building However if a variance were granted the antenna could be installed
permanently
In order to enforce the removal of a temporary antenna staff is concurrently proposing a code
amendment to require approval of an Interim Use Permit for roof mounted antennas exceeding
15 feet in height The approval ofthe Interim Use Permit is contingent on approval of the
zoning ordinance amendment to Section 20 1515 requiring an Interim Use Permit UP for
antennas in excess of 15 feet in height mounted on roofs
ACTION REQUIRED
City Council approval requires a majority vote of City Council present
PLANNING COMMISSION SUMMARY
The Planning Commission held a public hearing on November 20 2007 to review the
proposed Interim Use Permit The Planning Commission voted 6 to 0 to approve the proposed
Interim Use Permit contingent on approval of the zoning ordinance amendment to Section 20
1515 of the Chanhassen City Code
The Planning Commission discussion raised the issue of approval from the Federal
Communications Commission FCC This type of ISM band does not require review by the
FCC or the Minnesota Historical Commission Attached is an email from Kelly Orth
Rosemount Inc dated November 15 2007 confirming this Staff contacted the Carver
County Historical Society to ensure that the antenna would not affect any historical sites or
buildings and this was also confirmed
The Planning Commission discussion also addressed the issue of extending the time frame for
the antenna past the six 6 month deadline The applicant would have to request an extension
which would go before The City Council for approval
The City 01 Chanhassen A growing community with clean lakes quality schools a channing downtown thriving businesses winding trails and beautiful parks A great place to live work and play153
Todd Gerhardt
RosemountUP Planning Case 07 25
December 10 2007
The November 20 2007 Planning Commission minutes are item la of the December 10 2007 agenda
RECOMMENDATION
Staff and Planning Commission recommend the adoption of the motion approving the Interim Use
Permit for aroof mounted antenna as specified on page 7 in the staff report dated November 20 2007
ATTACHMENTS
1 Email from Kelly Orth Rosemount Inc dated November 15 2007
2 Planning Commission Staff Report Dated November 20 2007
g plan2007 planning cases 07 25 rosemount iup executive summary doc
154
FCC compliance Page 1 of 1
Auseth Angie
From Kelly Orth@ EmersonProcess com
Sent Thursday November 15 2007 2 15 PM
To Auseth Angie
Subject FCC compliance
Angie
The radios we use in our wireless sensor devices use IEEE 802 154 radios which are approved for use in the
Industrial Scientific and Medical bands ISM specifically the 240 248 GHz ISM band The ISM bands are set
aside for public use and are regulated by the FCC but site specific licenses are not required Another type of
radio used in this same ISM band are the 802 11 big radios used in Wi Fi enabled wireless internet products
commonly used in homes and businesses for wireless internet interconnectivity Another type of radio in this 24
GHz ISM band are Bluetooth radios commonly used for wireless headsets All these types of radios in the ISM
band do not require FCC licensing since the bands are license free for the general public to use
We do have FCC approval on our radio Testing and certification and been done to assure that they meet all the
technical requirements for 24 GHz ISM band use for example that they stay in band and do not have spurious
emissions into adjacent frequencies
The FCC Programmatic Agreement requirements for licensed band operation such as for cell phone towers do
not apply to ISM devices so we do not require review by the MN Historical Commission for our IUP application for
the wireless sensor network testing
Sincerely
Kelly Orth
Distinguished technologist
Rosemount Inc
1128 2007 155
CC DATE 12 10 07 ITPCDATE112007
CITY OF CHANHASSEN REVIEW DEADLINE 1108
CASE 07 25
BY AA AF JM ML
STAFF REPORT
PROPOSAL Request for an Interim Use Permit to install atemporary 25 foot roof mounted
mast antenna for the purpose ofExtended Range Wireless Sensor Network
Z testing
U LOCATION Rosemount Inc Emerson Process Management
8200 Market Boulevard
Lot 1 Block 1 Chanhassen Lakes Business Park 2nd Addition
APPLICANT Kelly Orth
Rosemount Inc
8200 Market Boulevard
Chanhassen MN 55317
PRESENT ZONING Industrial Office Park lOP
2020 LAND USE PLAN Office Industrial
ACREAGE 57 81 acres DENSITY NA
SUMMARY OF REQUEST The applicant is requesting an Interim Use Permit to install a
temporary 25 foot roof mounted mast antenna for the purpose of product testing
Notice of this public hearing has been mailed to all property owners within 500 feet
E LEVEL OF CITY DISCRETION IN DECISION MAKING The City has limited
rLJ discretion in approving or denying interim use permits based on whether or not the proposal
meets the use standards outlined in the Zoning Ordinance If the City finds that all the applicable
use standards are met the permit must be approved This is aquasi judicial decision
156
Rosemount IUP Request
Planning Case 07 25
November 20 2007
Page 2 of7
PROPOSAL SUMMARY
The applicant is requesting an Interim Use Permit IUP for a 25 foot mastantenna on the roof of
the southwest office building located on the Rosemount property The request is to allow the
antenna to extend above the trees and adjacent buildings in order to transmit signals from wireless
sensors located in various areas ofthe City for testing purposes City code limits roof mounted
antennas to 15 feet above the roof and requires an Interim Use Permit for heights exceeding 15 feet
Concurrently the City is revising the zoning ordinance to require an IUP for antennas mounted on
roofs exceeding 15 feet in height
APPLICABLE REGULATIONS
Chapter 20 Article IV Division 5 Interim Use Permits
Section 20 1515 1 Antennas mounted on roofs walls and existing towers
BACKGROUND
The property is located on Lot 1 Block 1 Chanhassen Lakes Business Park 2nd Addition which
is zoned Industrial Office Park lOP Rosemount is a supplier of process automation
technologies which are developed and tested on site Rosemount has developed a new
monitoring device that is ready for the testing phase Staff contacted the Carver County Historical
Society who concluded that the mastantenna will not impact any historical site or building
Attached is an email from Wendy Biorn Carver County Historical Society dated November 14
2007
157
Rosemount IUP Request
Planning Case 07 25
November 20 2007
Page 3 of7
ANALYSIS
The applicant is requesting an Interim Use Permit lUP to install a temporary 25 foot roof
mounted mast antenna City Code permits roof mounted antennas up to 15 feet in height and
requires an lOP for antennas exceeding the 15 foot limitation The purpose of the IUP is to
extend the antenna above the treetops to allow for optimal remote transmission to test a new
battery powered wireless mesh network technology
Lake AM
Pari
100
Highway
312
Bandimere
Pari
Rosemount is in the testing phase of development for the
wireless mesh network technology and has located several
remote transmitters at various locations throughout the City
which include Bandimere Park Power Hill Park Lake Ann Park
the Water Treatment Plant Highway 312 the Lakeside
Development and another location which is yet to be
determined as illustrated in the network schematic to the left
The two story building on which the mast antenna will be
mounted is 32 feet high Should the Interim Use Permit be
approved the antenna will be permitted to achieve a total height
of 57 feet above grade
If the antenna was mounted to a freestanding tower the maximum
height allowed for the tower including the antenna is 150 feet and
would require a Conditional Use Permit CUP The applicant
contemplated applying for a CUP to install a freestanding tower to
allow for a greater height however since the proposed antenna is
needed only temporarily they would prefer to mount it on the
roof
1I
j
i
II
1
1
City Code allows temporary antennas and or towers for test
purposes for up to 72 hours without a height limitation However
the proposed temporary tower exceeds the 72 hour limitation As
an example of the proposed mast antenna the applicant
photographed a temporary mast antenna used for testing purposes
The proposed mast antenna will be less visible as it will be grey in
color constructed of metal and steel materials
The nearest residential subdivision is Lake Susan Hills West
which is in excess of 1300 feet from the southwest building in
which the mast antenna is proposed to be located In addition the
proposed site is surrounded by dense vegetation
The antenna structure will not be substantially visible outside the boundaries of the Rosemount
property The antenna is a vertical monopole design and is 20 inches long 5 8 inch diameter
and weighs 8 ounces It will be mounted on a 25 foot tall metal mast antenna that is estimated to
be less than 2 inches in diameter The mast antenna will be anchored by multiple steel guy wires
158
Rosemount IUP Request
Planning Case 07 25
November 20 2007
Page 4 of7
to the roof ofthe two story office building which is 32 feet in height It will be designed and
certified to meet all applicable building codes as well as approval from the Federal Aviation
Administration FAA Federal Communications Commission FCC and any appropriate state
review authority The mastantenna will not impact any historically significant site or building
A building permit will be required prior to installation ofthe mast antenna It is staffs opinion
that locating the temporary antenna on the roofwill have a far less visual impact than a free
standing tower Granting of the IUP is reasonable given the mastantenna is intended for
temporary use as well as the unique site characteristics
Site Characteristics
The site is surrounded by mature trees buildings and higher elevations which will interfere with
the radio transmission line of site which is required for extended range capabilities
approximately 1 mile A IS foot tall antenna atop the two story office building would allow
only point to point wireless testing and would not allow the extended range testing of wireless
mesh network technology which is a key element of the new wireless sensor network
Preliminary testing has shown that a 25 foot tall mastantenna atop Rosemount s two story office
building is needed in order to conduct extended range testing over a period of two to six months
of Rosemount s battery powered wireless sensor products and their associated wireless mesh
network technology
Permitted Use
An antenna is a permitted use in the lOP district However the height is limited when mounted
on a roof The maximum height is 15 feet above the roof and 10 feet from the roof edge An
IUP is required for heights exceeding the IS foot height limitation Due to the topography ofthe
site and the surrounding area a IS foot tall antenna will not reach above the trees The trees and
surrounding buildings will interfere with the wireless signals that are required to adequately and
accurately test the product to its full potential
FINDINGS
The Planning Commission and the City Council shall grant an Interim Use Permit only if it finds
that such use at the proposed location complies with the General issuance standards of Section
20 323 of the Chanhassen City Code
a Will not be detrimental to or endanger the public health safety comfort convenience or general
welfare of the neighborhood or the city
Finding The mast antenna will be mounted on top of the Rosemount roof It will be located
entirely on the property and is inaccessible to the general public Granting the IUP will not be
detrimental to the public health safety comfort convenience or general welfare of the
neighborhood or the city
b Will be consistent with the objective ofthe city s comprehensive plan and this chapter
159
Rosemount IUP Request
Planning Case 07 25
November 20 2007
Page 5 of7
Finding An antenna is apermitted use in the lOP district and is consistent with the
comprehensive plan as well as the zoning code
c Will be designed constructed operated and maintained so to be compatible in appearance with
the existing or intended character of the general vicinity and will not change the essential
character ofthat area
Finding The nearest subdivision is in excess of 1 300 feet west of the proposed antenna
Visibility ofthe mast antenna will be significantly limited The site is also surrounded by dense
vegetation to the south In addition the mast antenna will be less than 2 inches in diameter and it
will be grey in color as it will be constructed ofmetal which will have minimal visual impact
d Will not be hazardous or disturbing to existing or planned neighboring uses
Finding The antenna structure will not be substantially visible outside the boundaries ofthe
Rosemount property The mast antenna is a vertical monopole design and is 20 inches long
5 8 inch diameter and weighs 8 ounces It will be mounted to a 25 foot tall antenna mast that is
estimated to be less than 2 inches in diameter The antenna mast will be anchored by multiple
guy wires to the roof of the two story office building which is 32 feet in height In addition the
nearest residential subdivision is located in excess of 1 300 feet away from the proposed site
e Will be served adequately by essential public facilities and services including streets police and
fire protection drainage structures refuse disposal water and sewer systems and schools or
will be served adequately by such facilities and services provided by the persons or agencies
responsible for the establishment of the proposed use
Findings The building for which the mast antenna will be located currently exists and is
adequately served by public facilities and services including streets police and fire protection
drainage structures refuse disposal water and sewer systems
f Will not create excessive requirements for public facilities and services and will not be
detrimental to the economic welfare ofthe community
Findings The primary use is currently constructed on the site The proposed mast antenna will
have little or no impact on the economic welfare ofthe community
g Will not involve uses activities processes materials equipment and conditions of operation
that will be detrimental to any persons property or the general welfare due to excessive
production of traffic noise smoke fumes glare odors rodents or trash
Findings The mast antenna will be located entirely on the Rosemount property atop of atwo
story building The mastantenna will transmit signals to remote antennas in various locations
throughout the city It will not be detrimental to any person or property or the general welfare of
the community there will not be an increase oftraffic noise smoke fumes glare odors
rodents or trash
160
Rosemount IUP Request
Planning Case 07 25
November 20 2007
Page 6 of7
h Will have vehicular approaches to the property which do not create traffic congestion or
interfere with traffic or surrounding public thoroughfares
Findings The proposed mast antenna is a secondary use ofthe property which will only be
used observed by persons currently working at the Rosemount building Thus it will not
increase traffic or interfere with surrounding public thoroughfares
1 Will not result in the destruction loss or damage of solar access natural scenic or historic
features ofmajor significance
Findings The mast antenna is a vertical monopole design and is 20 inches long 5 8 inch
diameter and weighs 8 ounces It will be mounted to a 25 foot tall antenna mast that is
estimated to be less than 2 inches in diameter The antenna mast will be anchored by multiple
guy wires to the roof of the two story office building which is 32 feet in height It will have
little or no visual impact on its surroundings
J Will be aesthetically compatible with the area
Findings The antenna structure will not be substantially visible outside the boundaries of the
Rosemount property The mast antenna is a vertical monopole design and is 20 inches long
5 8 inch diameter and weighs 8 ounces It will be mounted to a 25 foot tall antenna mast that is
estimated to be less than 2 inches in diameter The antenna mast will be anchored by multiple
guy wires to the roof ofthe two story office building which is 32 feet in height It will be
designed and certified to meet all applicable building codes as well as approval from the
Federal Aviation Administration FAA Federal Communications Commission FCC and
any appropriate state review authority The mastantenna will not impact any historically site
or building
k Will not depreciate surrounding property values
Findings The mast antenna will not be substantially visible outside of the Rosemount property
and thus will not impact the surrounding property values The nearest subdivision is in excess
of 1 300 feet
1 Will meet standards prescribed for certain uses as provided in this ordinance
Findings It will be designed and certified to meet all applicable building codes as well as
approval from the Federal Aviation Administration FAA Federal Communications
Commission FCC and any appropriate state review authority The mast antenna will not
impact any historically site or building A building permit will be required prior to
installation of the mastantenna
161
Rosemount IUP Request
Planning Case 07 25
November 20 2007
Page 7 of7
RECOMMENDATION
Staff and the Planning Commission recommend the City Council recommends that the Planning
Commission adopt the following motion
The Planning Commission recommends approval ofCity Council approves Planning Case 07 25
for an Interim Use Permit to install a 25 foot mastantenna atop the two story office building at
Rosemount Inc located on Lot 1 Block 1 Chanhassen Lakes Business Park 2nd Addition as
shown in plans dated received November 2 2007 based on the findings of fact in the staff report
and subject to the following conditions
1 A building permit must be approved prior to installation of the mastantenna
2 The interim use permit is valid for a period ofsix 6 months from the date of building permit
approval Should the interim use permit need to be extended the applicant will need to request
a formal extension 60 days prior to the expiration date ofthe permit
3 Approval ofthis application is contingent upon City Council approval ofthe zoning ordinance
amendment to Section 20 1515 Antennas mounted on roofs walls and existing towers
requiring an Interim Use Permit lUP for antennas in excess of 15 feet in height
ATTACHMENTS
1 Findings of Fact and Recommendation
2 Development Review Application
3 Reduced copy oflot details dated received November 2 2007
4 Email from Wendy Biom Carver County Historical Society dated November 14 2007
5 Public Hearing Notice and Affidavit of Mailing
g plan2007 planning cases 07 25 rosemount iupiup report doc
162
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
FINDINGS OF FACT
AND ACTION
INRE Application of Kelly Orth of Rosemount Inc Emerson Process Management for an
Interim Use Permit to allow a 25 foot high temporary mast antenna atop the roof of a
two story building Planning Case No 07 25
On November 20 2007 the Chanhassen Planning Commission met at its regularly
scheduled meeting to consider the Application of Kelly Orth of Rosemount Inc Emerson
Process Management for an Interim Use Permit to allow a 25 foot high temporary mast antenna
atop of Rosemounts two story building at 8200 Market Boulevard located in the Industrial Office
Park District lOP on Lot 1 Block 1 Chanhassen Lakes Business Park 2nd Addition The Planning
Commission conducted a public hearing on the proposed Interim Use Permit which was preceded
by published and mailed notice The planning Commission heard testimony from all interested
persons wishing to speak and now makes the following
FINDINGS OF FACT
1 The property is currently zoned Industrial Office Park lOP
2 The property is guided by the Land Use Plan for OfficeIndustrial
3 The legal description of the property is Lot 1 Block 1 Chanhassen Lakes Business Park 2nd
Addition
4 The Planning Commission and the City Council shall grant an Interim Use Permit only if it
finds that such use at the proposed location complies with the General issuance standards of
Section 20 323 of the Chanhassen City Code
a The mast antenna will be mounted on top of the Rosemount roof It will be located entirely
on the property and is inaccessible to the general public Granting the UP will not be
detrimental to the public health safety comfort convenience or general welfare of the
neighborhood or the city
b An antenna is a permitted use in the lOP district and is consistent with the comprehensive
plan as well as the zoning code
c The nearest subdivision is in excess of 1 300 feet west of the proposed antenna Visibility of
the mast antenna will be significantly limited The site is also surrounded by dense
vegetation to the south In addition the mast antenna will be less than 2 inches in diameter
and it will be grey in color as it will be constructed of metal which will have minimal visual
impact
1
163
d The antenna structure will not be substantially visible outside the boundaries of the
Rosemount property The mastantenna is a vertical monopole design and is 20 inches
long 5 8 inch diameter and weighs 8 ounces It will be mounted to a 25 foot tall antenna
mast that is estimated to be less than 2 inches in diameter The antenna mast will be
anchored by multiple guy wires to the roof of the two story office building which is 32 feet
in height In addition the nearest residential subdivision is located in excess of 1 300 feet
away from the proposed site
e The building for which the mast antenna will be located currently exists and is adequately
served by public facilities and services including streets police and fire protection drainage
structures refuse disposal water and sewer systems
f The primary use is currently constructed on the site The proposed mastantenna will have
little or no impact on the economic welfare of the community
g The mast antenna will be located entirely on the Rosemount property atop of a two story
building The mast antenna will transmit signals to remote antennas in various locations
throughout the City It will not be detrimental to any person or property or the general
welfare of the community and there will not be an increase of traffic noise smoke fumes
glare odors rodents or trash
h The proposed mastantenna is a secondary use of the property which will only be
used observed by persons currently working at the Rosemount building Thus it will not
increase traffic or interfere with surrounding public thoroughfares
1 The mast antenna is a vertical monopole design and is 20 inches long 5 8 inch diameter
and weighs 8 ounces It will be mounted to a 25 foot tall antenna mast that is estimated to
be less than 2 inches in diameter The antenna mast will be anchored by multiple guy wires
to the roof of the two story office building which is 32 feet in height It will have little or no
visual impact on its surroundings
J The antenna structure will not be substantially visible outside the boundaries of the
Rosemount property The mast antenna is a vertical monopole design and is 20 inches
long 5 8 inch diameter and weighs 8 ounces It will be mounted to a 25 foot tall antenna
mast that is estimated to be less than 2 inches in diameter The antenna mast will be
anchored by multiple guy wires to the roof of the two story office building which is 32 feet
in height It will be designed and certified to meet all applicable building codes as well as
approval from the Federal Aviation Administration FAA Federal Communications
Commission FCC and any appropriate state review authority The mastlantenna will
not impact any historically site or building
k The mast antenna will not be substantially visible outside of the Rosemount property and
thus will not impact the surrounding property values The nearest subdivision is in excess of
1 300 feet
2
164
1 It will be designed and certified to meet all applicable building codes as well as approval
from the Federal Aviation Administration FAA Federal Communications Commission
FCC and any appropriate state review authority The mast antenna will not impact any
historically site or building A building permit will be required prior to installation of the
mast antenna
5 The planning report 07 25 Interim Use Permit dated November 20 2007 prepared by
Angie Auseth et aI is incorporated herein
ACTION
The Planning Commission recommends approval of Planning Case 07 25 for an Interim Use
Permit to install a 25 foot mast antenna atop the two story office building at Rosemount Inc
located on Lot 1 Block 1 Chanhassen Lakes Business Park 2nd Addition as shown in plans dated
received November 2 2007 based on the findings of fact in the staff report and subject to the
following conditions
1 A building permit must be approved prior to installation of the mastantenna
2 The interim use permit is valid for a period of six 6 months from the date of building permit
approval Should the interim use permit need to be extended the applicant will need to request
a formal extension 60 days prior to the expiration date of the permit
3 Approval of this application is contingent upon City Council approval of the zoning ordinance
amendment to Section 20 1515 Antennas mounted on roofs walls and existing towers
requiring an Interim Use Permit IUP for antennas in excess of 15 feet in height
ADOPTED by the Chanhassen Planning Commission on this 20th day of November
2007
CHANHASSEN PLANNING COMMISSION
BY
Its Chairman
g plan2007 planning cases 07 25 rosemount iup findings of fact doc
3
165
Planning Case No 61 cz
CITY OF CHANHASSEN
7700 Market Boulevard P O Box 147
Chanhassen MN 55317 952 227 1100
DEVELOPMENT REVIEW APPLICATION
PLEASE PRINT
Applicant Name and Address1fhkrzr Lr
Cl tl6Gt 411 5G 7
Contact M t ptJ lx1tt ri A I fl s
Phone 91f 7 Z 9 Fax
Email ftu I tM@IAI1U5 rp r etM
OW j
Contact fu CJ f 5Pc Ifd 1o
Phone@l 8 8 7 DS Fax
Email SWl cJ t fSttl@ ew1 hDI 7
V
NOTE Consultation with City staff is required prior to submittal including review of development
plans
Comprehensive Plan Amendment Temporary Sales Permit
Conditional Use Permit CUP Vacation of Right of Way Easements VAG
x Interim Use Permit IUP 11 5 Variance VAR
Non conforming Use Permit Wetland Alteration Permit WAP
Planned Unit Development Zoning Appeal
Rezoning Zoning Ordinance Amendment
Sign Permits
Sign Plan Review
Notification Sign 200
City to install and remove
X EmOW for Filing Fees Attorney Cost
50 UP SPRlVACNARlWAP Metes Bounds
450 Minor SUB pd n25u Gt 4
tI 00
TOTAL FEE r15 pd 2215 ct 14 8
Site Plan Review SPR
Subdivision
An additional fee of 3 00 per address within the public hearing notification area will be invoiced to the applicant
prior to the public hearing
Sixteen 16 full size folded copies of the plans must be submitted including an 8 X 11
reduced copy for each plan sheet along with a digital copy in TIFF GroupC4 f EN
Escrow will be required for other applications through the development contractNDV 0 2 2007
Building material samples must be submitted with site plan reviews CHANHASSEN PLANNING DEP1
NOTE When multiple applications are processed the appropriate fee shall be charged for
each application SCAt NED
166
PROJECTNAME Antenna for Extended Range Wireless Sensor Network
LOCATION Atop 2 story office building at Rosemount Inc facilities in Chanhassen
LEGAL DESCRIPTION PID 11251890010
Section 13 Township 116 Range 023 Lot DOl Block DOl
TOTAL ACREAGE 57 82 AC
WETLANDS PRESENT x YES NO
PRESENT ZONING IOP Industrial Office Park District
REQUESTED ZONING No Change
PRESENT LAND USE DESIGNATION Office Industrial
REQUESTED LAND USE DESIGNATION No Change
REASON FOR REQUEST Temporary 26 antenna needed for extended range testing of
wireless sensor network and battery powered wireless measurement products
The existing range of wireless sensor products can be extended to greater
than 1 mile by remote mounting higher gain omnidirectional antennas
24 long atop foot tall poles to achieve line of sight connections
over treetops Applications include citywide water waste systems
Duration of the test is 4 6 months
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions Before filing this application you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application
A determination of completeness of the application shall be made within 15 business days of application submittal A written
notice of application deficiencies shall be mailed to the applicant within 15 business days of application
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application I have attached a copy of proof of ownership
either copy of Owner s Duplicate Certificate of Title Abstract of Title or purchase agreement or I am the authorized person
to make this application and the fee owner has also signed this application
I will keep myself informed of the deadlines for submission of material and the progress of this application I further
understand that additional fees may be charged for consulting fees feasibility studies etc with an estimate prior to any
authorization to proceed with the study The documents and information I have submitted are true and correct to the best of
my knowledge
s I
f11 d
Ignature 0 pp Icant
5 oct 07
Date
Signature of Fee Owner Date
G pLAN forms Development Review ApplicationDOC Rev 12 05
SCANNED
SCAlltlED167
NORTH
LOCA TION
OF ANTENNA
L k 2 SkN
CITY oRF CHANHASSEN
ECEIVED
NOV 0 2 2007
CHANHASSEN PLANNING DEPT
168
From Wendy Biorn mailto wbiorn@co carver mn us
Sent Wednesday November 14 2007 4 58 PM
To AI Jaff Sharmeen
Subject tower
Sharmeen
Thank you for contacting me regarding the proposed temporary tower at 8200 Market Blvd in
Chanhassen Based on our conversation the closest possible historic property is an 1897
property owned by AI Klingelhutz This property is approximately 2 699 feet from the proposed
location of the 25 foot tower
The property is not on the national register and to my knowledge has not been assessed for
possible edibility I will investigate the situation more fully and contact you regarding it in the next
few days
Thanks for keeping us and historic properties in mind
Take care
Wendy Biorn
Executive Director
Carver County Historical Society
555 West 1st Street
Waconia MN 55387
952 442 4234
The unauthorized disclosure or interception of e mail is a federal crime See 18 U S C
Sec 2517 4 This e mail is intended only for the use of those whom it is addressed and
may contain informaion which is privileged confidential and exempt from disclosure
under law If you have received this e mail in error do not distribute or copy it Return it
immediately to the sender with attachments if any and notify the sender by telephone
169
CITY OF CHANHASSEN
AFFIDAVIT OF MAILING NOTICE
STATE OF MINNESOTA
ss
COUNTY OF CARVER
I Karen J Engelhardt being first duly sworn on oath deposes that she is and was on
November 8 2007 the duly qualified and acting Deputy Clerk of the City of Chanhassen
Minnesota that on said date she caused to be mailed a copy of the attached notice of Public
Hearing for the Rosemonnt Interim Use Permit Planning Case 07 25 to the persons named
on attached Exhibit A by enclosing a copy of said notice in an envelope addressed to such
owner and depositing the envelopes addressed to all such owners in the United States mail with
postage fully prepaid thereon that the names and addresses of such owners were those appearing
as such by the records of the County Treasurer Carver County Minnesota and by other
appropriate records
Subscribed and sworn to before me
this hdayof OfflV bty 2007
vM j
I NotaryPubli
j if1 KIM T MEUWISSEN II
Notary Public Minnesota
MY Commission Expires Jan 31 2010
170
Notice ofPublicHearing
Chanhassen PlanningCommissionMeeting
Date Time Tuesday November202007at700pmThishearingmaynot
start until later in the eveninodependinoontheorderoftheaoenda
Location Citv Hall Council Chambers7700MarketBlvd
Proposal Request for an InterimUsePermittoallowatemporaryantenna
on too of a buildina
Applicant Rosemount Inc
Property 8200 Market Boulevard
Location A location map is onthereversesideofthisnotice
The purpose of thispublichearingistoinformyouaboutthe
applicant s requestandtoobtaininputfromtheneighborhood
about this projectDuringthemeetingtheChairwillleadthe
What Happens public hearing throughthefollowingsteps
1 Staff will give anoverviewoftheproposedprojectattheMeeting2Theapplicantwillpresentplansontheproject
3 Comments arereceivedfromthepublic
4 Public hearingisclosedandtheCommissiondiscusses
the oroiect
If you want to seetheplansbeforethemeetingpleasevisit
the City s projectswebpageat
www ci chanhassenmnusservolan0725htmlIfyouwishto
talk to someone aboutthisprojectpleasecontactAngie
Questions Auseth by email ataauseth@cichanhassenmnusorby
Comments phone at 952 2271132Ifyouchoosetosubmitwritten
comments it is helpfultohaveonecopytothedepartmentin
advance of the meetingStaffwillprovidecopiestothe
Commission Thestaffreportforthisitemwillbeavailable
online on the projectwebsitelistedabovetheThursday
prior to the PlanninQCommissionmeetinQ
City Review Procedure
Subdivisions Planned Unit Developments Site PlanReviewsConditionalandInterimUsesWetlandAlterations
Rezonings Comprehensive Plan Amendments andCodeAmendmentsrequireapublichearingbeforethe
Planning Commission City ordinances require allpropertywithin500feetofthesubjectsitetobenotifiedofthe
application in writing Any interested party is invitedtoattendthemeeting
Staff prepares a report on the SUbject application thatincludesallpertinentinformationandarecommendation
These reports are available by request At the PlanningCommissionmeetingstaffwillgiveaverbaloverviewof
the report and a recommendation The item will beopenedforthepUblictospeakabouttheproposalasapartof
the hearing process The Commission will close thepubliChearinganddiscusstheitemandmakea
recommendation to the City Council The City CouncilmayreverseaffirmormodifywhollyorpartlythePlanning
Commission s recommendation Rezonings landuseandcodeamendmentstakeasimplemajorityvoteofthe
City Council except rezonings and land use amendmentsfromresidentialtocommercialindustrial
Minnesota State Statute 519 99 requires all applicationstobeprocessedwithin60daysunlesstheapplicant
waives this standard Some applications due to theircomplexitymaytakeseveralmonthstocompleteAny
person wishing to follow an item through the processshouldcheckwiththePlanningDepartmentregardingits
status and scheduling for the City Council meeting
A neighborhood spokesperson representative is encouragedtoprovideacontactforthecityOftendevelopers
are encouraged to meet with the neighborhood regardingtheirproposalStaffisalsoavailabletoreviewthe
project with any interested person s
Because the Planning Commission holds the publichearingtheCityCouncildoesnotMinutesaretakenand
any correspondence regarding the application willbeincludedinthereporttotheCityCouncilIfyouwishtohave
somethinn to be included in the reDort Dlease contactthePlanninaStaffDersonnamedonthenotification
Notice of Public Hearing
Chanhassen Planning Commission Meeting
Date Time Tuesday November 20 2007 at 7 00 p m This hearing may not
start until later in the evenin de endin on the order of the a enda
Location Cit Hall Council Chambers 7700 Market Blvd
Proposal Request for an Interim Use Permit to allow a temporary antenna
on to of a buildin
A Iicant Rosemount Inc
Property 8200 Market Boulevard
Location A location map is on the reverse side of this notice
The purpose of this public hearing is to inform you about the
applicant s request and to obtain input from the neighborhood
about this project During the meeting the Chair will lead the
What Happens public hearing through the following steps
at the Meeting 1 Staff will give an overview of the proposed project
2 The applicant will present plans on the project
3 Comments are received from the public
4 Public hearing is closed and the Commission discusses
the ro ect
If you want to see the plans before the meeting please visit
the City s projects web page at
www cLchanhassen mn us serv olan 07 25 html If you wish to
talk to someone about this project please contact Angie
Questions Auseth by email at aauseth@ci chanhassen mn us or by
Comments phone at 952 227 1132 If you choose to submit written
comments it is helpful to have one copy to the department in
advance of the meeting Staff will provide copies to the
Commission The staff report for this item will be available
online on the project web site listed above the Thursday
rior to the Plannin Commission meetin
City Review Procedure
Subdivisions Planned Unit Developments Site Plan Reviews Conditional and Interim Uses Wetland Alterations
Rezonings Comprehensive Plan Amendments and Code Amendments require a public hearing before the
Planning Commission City ordinances require all property within 500 feet of the subject site to be notified of the
application in writing Any interested party is invited to attend the meeting
Staff prepares a report on the subject application that includes all pertinent information and a recommendation
These reports are available by request At the Planning Commission meeting staff will give a verbal overview of
the report and a recommendation The item will be opened for the pUblic to speak about the proposal as a part of
the hearing process The Commission will close the pUblic hearing and discuss the item and make a
recommendation to the City Council The City Council may reverse affirm or modify wholly or partly the Planning
Commission s recommendation Rezonings land use and code amendments take a simple majority vote of the
City Council except rezonings and land use amendments from residential to commerciaVindustrial
Minnesota State Statute 519 99 requires all applications to be processed within 60 days unless the applicant
waives this standard Some applications due to their complexity may take several months to complete Any
person wishing to follow an item through the process should check with the Planning Department regarding its
status and scheduling for the City Council meeting
A neighborhood spokespersonlrepresentative is encouraged to provide a contact for the city Ollen developers
are encouraged to meet with the neighborhood regarding their proposal Staff is also available to review the
project with any interested person s
Because the Planning Commission holds the public hearing the City Council does not Minutes are taken and
any correspondence regarding the application will be included in the report to the City Council If you wish to have
somethin to be included in the re ort lease contact the Plannin Staff erson named on the notification
171
Disclaimer
This map is neither alegally recorded map nor asurvey and is not intended to be used as one This
map is a compilation of records information and data located in various city county state and federal
offices and other sources regarding the area shown and is to be used for reference purposes only
The City does not warrant that the Geographic Information System GIS Data used to prepare this
map are error free and the City does not represent that the GIS Data can be used for navigational
tracking or any other purpose requiring exacting measurement of distance ordirection or precision in
the depiction of geographic features If errors ordiscrepancies are found please contact 952 227 1107
The preceding disclaimer is provided pursuant to Minnesota Statutes 9466 03 Subd 21 2000 and
the user of this map acknowledges that the City shall not be liable for any damages and expressly
waives all claims and agrees to defend indemnify and hold harmless the Cityfrom any and all claims
brought by User its employees or agents orthird parties which arise out of the use s access oruseof
data provided
I
Disclaimer
This map is neither alegally recorded map nor a survey and isnot intended to be used as one This
map is a compilation of records information and data located in various city county state and federal
offices and other sources regarding the area shown and is to be used for reference purposes only
The City does not warrant that the Geographic Information System GIS Data used to prepare this
map are error free and the City does not represent that the GIS Data can be used for navigational
tracking or any other purpose requiring exacting measurement of distance ordirection or precision in
the depiction of geographic features If errorsor discrepancies are found please contact 952 227 1107
The preceding disclaimer is provided pursuant to Minnesota Statutes 9466 03 Subd 21 2000 and
the userof this map acknowledges that the City shall not be liable for any damages and expressly
waives all claims and agrees to defend indemnify and hold harmless the City from any and all claims
brought by User its employees or agents orthird parties which arise out of the users access oruseof
data provided
172
LUTHERAN CHURCH OF THE
LIVING CHRIST
PO BOX 340
CHANHASSEN MN 55317 0340
ROBERTS AUTOMATIC PRODUCTS INC
880 LAKE DR
CHANHASSEN MN 55317 9325
VIGIL COMPANIES LLC
550 LAKE DR
CHANHASSEN MN 55317 9378
PHM CHANHASSEN INC
2845 HAMLlNE AVE N
ROSEVILLE MN 55113 7127
CSM PROPERTIES INC
500 WASHINGTON AVE S
STE 3000
MINNEAPOLIS MN 55415 1149
AUSMAR DEVELOPMENT CO LLC
C O LOTUS REALTV
PO BOX 235
CHANHASSEN MN 55317 0235
NORTHCOTT COMPANY
250 EAST LAKE DR
CHANHASSEN MN 55317 9364
VILLAGES ON THE PONDS ASSN INC
C O LOTUS REALTY SERVICES
PO BOX 235
CHANHASSEN MN 55317 0235
ROSEMOUNT INC
ATTN CONTROLLER
12001 TECHNOLOGY DR
EDEN PRAIRIE MN 55344 3695
LAKE SUSAN APARTMENT HOMES LLC
11455 VIKING DR
EDEN PRAIRIE MN 55344 7251
WHEATSTONE RESTAURANT GROUP
250 EAST LAKE DR
CHANHASSEN MN 55317 9364
173
Public Hearing Notification Area 500 feet
Rosemount Interim Use Permit
8200 Market Boulevard
City of Chanhassen
Planning Case 07 25
Chan View
AOad
174
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952227 1110
Building Inspections
Phone 952227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952227 1140
Fax 952227 1110
Park Recreation
Phone 952227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952227 1110
Web Site
WIIW ci chanhassen mn us
MEMORANDUM
TO Todd Gerhardt City Manager
i
SUBJ Approval Temporary On Sale Liquor License St Hubert
Catholic Community 8201 Main Street
St Hubert Catholic Community has submitted an application for a temporary
on sale liquor license for their staff Christmas party on January 4 2008 The
party will be held at the church Their sthff members will receive two drinks for
free but will have to purchase any additional beverages
Staff recommends approval of the request from 5t Hubert Catholic Community
for a temporary on sale liquor license fo their staff Christmas party on
January 4 Approval of this request requires a simple majority vote of those
City Council members present
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play
FROM Karen J Engelhardt Office Manager
DATE December 13 2007
RECOMMENDATION
175
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 11 BO
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
1
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Paul Oehme Dir of Public Works City Engineer
01 yDATEDecember102007
SUBJ Award a Consultant Contract to Barr Engineering Company for
Design Services for School Well Improvements New Well 14
Project No 08 08
REQUESTED ACTION
A ward a consultant contract to Barr Engineering
School Well Improvements in the amount of
for design services for
This contract will allow the City to solicit bids for
a municipal production well
the School well into
BACKGROUND
As you are aware City recently lost the
during heavy irrigation pumping in
new supply to its system toreplace the lost
summer 2008 irrigation pumping season
undertake two projects The first which is
designing and drilling two new wells nos 12
near the recently completed east water treatment
second is to convert a well formerly used
School for use as a municipal supply well
the school district but was turned over to the
currently can only pump 250 gpm and
treatments available to pump into the
the well this fall and the well has been
production Also along with the test
west well field to identify any well
The following work will be designed as part of this project
Existing downhole equipment will be removed and replaced with a new
pump and motor sized to deliver water to either the high or low system
depending on VFD
The school well will be redeveloped to ensure that the cavern is stable and
yield is reasonably sand free as defined by A WWA
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautitul parks A great place to live work and play176
Todd Gerhardt
School Well Improvements
December 10 2007
Page 2
Following redevelopment the well will be test pumped to confirm design
points and capacity
New well equipment will include a submersible motor and vertical turbine
pump designed for approximately 800 gpm
Existing pitless adapter will be removed and replaced with a new pitless
adapter
The site immediately around the well will be regraded to meet state well
code
Well appurtenances will be added to the site including a meter in ameter
manhole and an air vacuum and shut off valve in another manhole
The existing well control equipment in the school will be abandoned and
removed to meet school district requirements
A new well panel housing a motor control center and SCADA panel will
be located south of the school on property owned by the City If the
distance is too great a location closer to the well will be identified and
used Access to the panel will be limited to a small gravel road or
reinforced turf
Modify the City s existing SCADA system to include this new well
The wiring and VFD in this panel will be sized for a 1 200 gpm well to
accommodate potential future production
A directionally drilled raw watermain will carry flow from the well down
to Wellhouse No 7 This pipe will be sized to accommodate potential
future well production in the area
Flow from the school well will have chemical treatment at Well No 7
This will either be via a skid mounted treatment system or by modifying
the chemical treatment facilities currently associated with Well No 7 to
also treat the flow from the school well
Well No 7 will also be rehabilitated as part of this work This will
include removal of all downhole equipment redevelopment of the open
hole test pumping of the well refurbishing or replacing the existing
downhole equipment depending upon its condition
The new raw watermain installed with the Lake Harrison Development
will be temporarily used as a distribution main This pipe will be
connected into the low system at Galpin Boulevard in a way that will be
relatively easily used when the new treatment plant is constructed The
flow from the school well will be set up to be directed either into the high
or low system
Preliminary Planning and Neighborhood Meeting
Barr will work with the City to layout a concept of the modified well site the
control panel and raw water main Staff is looking at using some of the control
equipment from Well 5 for this project to save cost Concept layouts will be
prepared on aerial photos similar to what was done for the work currently
underway for Wells 12 and 13 Site layout will take into account well code
clearances and site access issues Staff has discussed this project with the DNR
G ENGIPUBLIC2008Projectsl08 08 School well No 141bkgd 120507 award consultant contractdoc177
Todd Gerhardt
School Well Improvements
December 10 2007
Page 3
and Minnesota Department of Health and both regular agencies have not seen any
flaws to date in staffs preliminary design The design portion of this work will
include a review of the existing and proposed water use in the high and low zones
to make sure that the appropriate flow is directed to each
A neighborhood meeting will be held to inform residents about the project Barr
will help set up and publicize the meeting and will also prepare graphics needed
to depict the proposed project to those attending The City and Barr will work
with Minnetonka School District to coordinate this project with them and to
generally inform them about what to expect before during and after construction
of the proposed improvements Staff has met with the School District recently to
discuss the project and they have generally accepted the project concept An
easement over the watermain will need to be dedicated to the City by the School
District
Final Design Preparation of Contract Documents and Bidding
Barr will perform calculations to determine pumping rate pump and motor size
drop pipe size and surface finishing Calculations and layout for site piping will
also be completed by Barr that will include a valve manhole and a meter manhole
Barr will perform preliminary calculations related to volume of water that will
normally be routed to the high and low systems during an average day and a peak
day to make sure that the system will function properly Barr will perform layout
and design of surface restoration features for the well site at the school the
electric panel on City owned property and for the area disturbed near Well 7
Finally a landscape plan will be completed to help screen the panel site Barr
will perform electrical calculations and layout needed related to supplying power
to the well and for SCADA and controls Barr will perform layout and design of
the raw water main to connect the well to the Well 7 site and then to the existing
distribution system It is assumed that the pipe will be installed by directional
drilling methods No interaction with the Minnesota Department of
Transportation MnDOT is expected on this project
Barr will assist the City in applying for permits related to refurbishing of the
school well and the installation of the connecting raw water main No production
permits are anticipated since the well is still only replacing permitted existing
appropriations Staff will work with the Minnesota Department of Health on any
variances or regulation interpretation related to converting the school well to a
municipal well
Barr will complete a field survey for design for the well and proposed raw water
mains Surveys will include contacting Gopher State One Call for design
verification
Barr will prepare contract documents including plans and specifications for use in
obtaining bids and which will include rehabilitation of Well 7 and construct the
G ENGIPUBLIC2008ProjeclSl08 08 School well No 141bkgd 120507 award consultant contractdoc178
Todd Gerhardt
School Well Improvements
December 10 2007
Page 4
estimate based on design quantities and will bid the project Barr will maintain
bidder s lists respond to contractor s questions prepare and distribute addendum
if needed attend bid openings review bids and prepare a recommendations of
award
Due to the nature and scope of the work the project will be on a tight timeline in
order to have the wells in operation prior to the beginning of 2008 peak irrigation
season Barr is currently working on the Wells 12 and 13 projects This
consultant contract was competitively bid Staff is requesting that Barr work on
the school well project for continuity and because of time constraints Staff has
reviewed Barr s proposal and finds their costs acceptable for the scope of services
provided
Funding for this project has been budgeted for in the 2008 Capital Improvements
Plan
The consultant work will be contracted on a time and materials bases with a not
to exceed amount As with all City engineering contracts the consultant must
submit periodic invoices that staff will review before processing The consultant
will be required to submit timesheets verifying the hours worked on the project
and expense sheets Staff will review the invoices and expense sheets for
accuracy and conformance to the contract
The anticipated schedule of the project is as follows
Neighborhood Meeting
Bid Opening
Award Contract
Start Construction
Substantial Completion
January 2008
February 2008
March 2008
March 2008
End of May 2008
RECOMMENDATION
Staff recommends the Council approve a consultant contract with Barr
Engineering Company in the amount of 47 500 for engineering services for
School Well Well 14 improvements
Attachments
G ENGIPUBLIC2008Projects 08 08 School well No l4 bkgd 120507 award consultant contractdoc179
M i i c r J iJ
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Water System Improvements
Account 1 Account 3
Account 2
Type Unassigned
Useful Life
Category Utilities
Priority nla
Pl o ject W045
Project Nllme West Junior High School Well
Total Project Cost 715 000
Description I
This improvement will convert the school well from a stand by well into a regular producing municipal well Currently the well can only produce
250 gpm It is anticipated the well could produce as much as 800 gpm The project consists of a new submersible pump and using some electrical
components from well 5 that are anticipated to be decommissioned A new water main is necessary to be extended to well 7 well house for
chemical treatment Valve improvements are also anticipated to have the ability to bleed this water out of the high zone pressure area
Justification I
To meet the current water demand of the city
Expenditures
Construction
2008
715 000
715 000
2009 2010 2011 2012 Total
715 000
715 000Total
Funding Sources
Water Utility Fund
2008
715 000
715 000
2009 2010 2011 2012 Total
715 000
715 000Total
Operational ImpactOther I
180
c
181
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
MEMORANDUM
TO Mayor
City Council
FROM 7
c
Greg Sticha Finance Director
DA TE December 10 2007
SUBJ Adoption of the Proposed 2008 Budget and CIF
The City of Chanhassen has gone through an extensive process in evaluating its
budgets and capital improvement plans CIF for 2008 through 2012 This
process was finalized with the Truth in Taxation hearing last Monday Staff is
recommending that the 2008 Budget and the CIP be adopted as presented
BACKGROUND
The final 2008 Budget being adopted is for a total levy of 9 834 965 which is
259187 or 2 7 more than the 2007 levy The final levy is 20 000 less than
the preliminary levy of 9 854 965 and includes 250 000 for roads in 2008
Total spending before transfers in the General Fund only increased 105 900 or
1 17 from the previous year s general fund expenses This include a new
public safety position and wage increases for all general fund employees The
total levies for bonding of debtstreets and expenses for streets increased
116 262 6 more than 2007 This amount includes 250 000 for streets in
2008 that was not included in 2007 The average homeowner should see no
increase in the city portion of their property tax bill and in most cases residents
will see a slight decrease
CIP
The CIF funds larger construction and building projects such as a public works
facility a fire station and the eventual construction of a second water treatment
plant The CIF also accounts for other infrastructure purchases such as streets
water lines and wells storm water construction and upgrades and sanitary sewer
lines In addition the CIP funds our capital replacement fund with a levy of
824 000 on an annual basis to fund ongoing equipment replacements and
purchases
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play182
Adoption of the Proposed 2008 Budget and CIP
December 10 2007
Page 2 of2
RECOMMENDA TION
Staff recommends that the City Council adopt the 2008 Budget and CIP as
presented on December 10 2007 Approval of the budget requires a simple
majority vote of those present
ATTACHMENTS
1 Proposed Resolution Adopting the 2008 Budget CIF
2 PowerPoint Presentation 2008 Budget CIF Adoption
3 2008 Budget
4 2008 12 CIF
5 2008 Final Levy Impact Spreadsheet
183
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
DATE December 10 2007 RESOLUTION NO 2007
MOTION BY SECONDED BY
A RESOLUTION ADOPTING THE 2008 BUDGET AND
ESTABLISHING TAX LEVIES FOR 2007 COLLECTIBLE IN 2008
WHEREAS the City Council has examined the budgetary and tax levy needs for
Chanhassen for the calendar year 2008 through detailed public budget meetings and
WHEREAS the Truth in Taxation meeting was held to receive public input into the budget
and tax levy for 2008
NOW THEREFORE BE IT RESOLVED by the City Council of the City of
Chanhassen that the 2008 Budget for the City of Chanhassen is adopted with revenue and
expenditure amounts for the General Fund of 9 318 300 Special Revenue Funds of 19 500 and
154 500 respectively which are detailed in the 2008 Budget which is made part of this motion by
reference and
BE IT FURTHER RESOLVED that the City Council of the City of Chanhassen adopts a
tax levy of 824 000 for the purpose of equipment upgrades and purchases for 2008 and
BE IT FURTHER RESOLVED that the City Council of the City of Chanhassen adopts a
CIP for years 2008 2012 in the total amount of 85 536 300 and
BE IT FURTHER RESOLVED that the City Council of the City of Chanhassen
determines that certain bonded indebtedness levies are hereby adopted to meet statutory
requirements and bond covenants and that the County Auditor is hereby authorized to spread the
adopted bonded debt levies as shown on the attached Tax Levy Certification document and
BE IT FURTHER RESOLVED that the City of Chanhassen authorizes the County
Auditor to levy the amounts shown on the attached Tax Levy Certification document upon taxable
property in the City of Chanhassen in 2007 for collection in 2008 as set forth in the attached Tax
Levy Certification document
Passed and adopted by the Chanhassen City Council this 10th day of December 2007
AITEST
Todd Gerhardt City Manager Thomas A Furlong Mayor
YES NO ABSENT
184
185
186
187
188
189
190
191
192
GENERAL GOVERNMENT
1110 Legislative
1120 Administration
1130 Finance
1140 Legal
1150 Assessing
1160 MIS
1170 City Hall
1180 Elections
1190 Library Building
TOTAL
LAW ENFORCEMENT
1210 Law Enforcement
1220 Fire
1250 Building Inspection
1260 CSO
TOTAL
PUBLIC WORKS
1310 Engineering
1320 Street Maintenance
1350 Street Lighting
1370 Vehicle Maintenance
TOTAL
COMMUNITY DEVELOPMENT
1410 Planning Commission
1420 Planning Administration
1430 Senior Commission
TOTAL
PARKS RECREATION
1510 Park Rec Commission
1520 Park Administration
1530 Recreation Center
1540 Lake Ann
1550 Park Maintenance
1560 Senior Center
1600 Recreation Programs
1700 Self Supporting Programs
TOTAL
Total Operational Expenditures
Transfer for Roads
TOTAL GENERAL FUND
CITY OF CHANHASSEN
2008 BUDGET
Expenditures
Personal Materials Contractual Capital 2007
Services Supplies Services Outlay Total Total Change
34 200 200 100 500 134 900 123 400 9 32
374 500 500 59 900 434 900 438 000 0 71
210 600 300 91 500 200 302 600 318 000 4 84
168 000 168 000 168 000 0 00
101 600 101 600 100 100 1 50
163 600 2400 119 300 285 300 281 200 146
68400 42 300 282 100 392 800 428 600 8 35
21 500 6400 27 900 19 700 41 62
3 000 107 200 110 200 102 200 7 83
872 800 48 700 1 036 500 200 1 958 200 1 979 200 1 06
75 100 1427 000 1 502 100 1 333 700 12 63
510 600 47 000 116 000 673 600 678 600 0 74
658 800 8 700 23400 690 900 756 100 8 62
55 300 4 000 13 700 73 000 69 200 549
1 299 800 59 700 1 580 100 2 939 600 2 837 600 3 59
506 500 900 29 900 300 537 600 528400 1 74
599 700 133 500 33 000 1 300 767 500 786 500 242
4 500 315400 319 900 314 900 1 59
241 700 150400 46 500 6 000 444 600 459 600 3 26
1 347 900 289 300 424 800 7 600 2 069 600 2 089400 0 95
200 4 000 4 200 4 200 0 00
367 800 700 14 100 382 600 377 600 1 32
20 100 15 200 35 300 30 100 17 28
387 900 900 33 300 422 100 411 900 248
200 2 000 2 200 2 200 0 00
118 500 1 000 9 600 129 100 123 500 4 53
212 700 11 500 77 000 301 200 269 100 11 93
13 800 9 100 51400 74 300 71 800 348
661 300 81 300 88 200 4 000 834 800 819 600 1 85
36 900 4 300 19 500 60 700 52400 15 84
165 800 17 100 93 500 276400 274 200 0 80
26 900 5 200 68 000 100 100 131 500 23 88
1 235 900 129 700 409 200 4 000 1 778 800 1 744 300 1 98
5 144 300 528 300 3 483 900 11 800 9 168 300 9 062 400 1 17
150 000
9 318 300 9 062 400 2 82
193
CITY OF CHANHASSEN
2008 BUDGET
REVENUE
101 General Fund
2006 2007 2007 2008 Inc Over
ACCOUNT DESCRIPTION ACTUAL BUDGET PROJECTED BUDGET PY Budget
GENERAL PROPERTY TAX
3010 Current Property Tax 6 121408 6 558 100 6 558 100 6 833 900 4 2
3002 Allowance for Delinquent Taxes 320 000 320 000 320 000
3011 Delinquent Property Tax 63 896 50 000 50 000 50 000
3041 Homestead Ag Credit
3090 Other Property Taxes 8
3500 Local Government Aid
TOTAL GENERAL PROPERTY TAX 6 185 312 6 288 100 6 288 100 6 563 900 44
LICENSES
3203 Dog Kennel 900 500 500 500
3205 Dog or Cat 5 257 4 500 4 500 5 000
3213 Solicitor 300 500 500 500
3223 3 2 Off and On Sale 2 225
3226 Liquor On and Off Sale 79 977 84 000 84 000 84 000
3227 Club and Sunday 1 600
3230 Rental Housing Licenses 5 950 15 000 15 000 15 000
3284 Rubbish 3 600 3 000 3 000 3 000
TOTAL LICENSES 99 809 107 500 107 500 108 000 0 5
PERMITS
3301 Building 700450 825 000 725 000 725 000
3302 Plan Check 365 892 330 000 330 000 330 000
3305 Heating NC 119 392 120 000 120 000 120 000
3306 Plumbing 94 641 85 000 85 000 95 000
3307 Trenching 42 707 35 000 35 000 35 000
3308 Gun 700 1 000 1 000 1 000
3309 Sprinkler 11448 14 000 14 000 14 000
3311 Sign 7 255 6 500 6 500 7 500
3320 Stable 220 300 300 300
3330 Elec Permit App Forms 104
3331 Firework s Application Fee 400
3390 Misc Permits 2 945 1 000 1 000 2 000
TOTAL PERMITS 1 346 155 1417 800 1 317 800 1 329 800 5 7
FINES PENALTIES
3401 Traffic Ordinance Violation 152 365 130 000 140 000 150 000
3402 Vehicle Lockouts 2450 2 500 2 500 2 500
3404 Dog Cat Impound 6 583 4 000 4 000 5 000
3405 Other Fines and Penalties 1 548
TOTAL FINES PENALTIES 162 946 136 500 146 500 157 500 154
INTERGOVERNMENTAL REVENUE
3509 Other Shared Taxes 175 685 165 000 165 000 175 000
3510 Grants State 61424 40 000 40 000 50 000
TOTAL INTERGOVERNMENTAL REV 237 109 205 000 205 000 225 000 9 8
194
CITY OF CHANHASSEN
2008 BUDGET
REVENUE
101 General Fund
2006 2007 2007 2008 Inc Over
ACCOUNT DESCRIPTION ACTUAL BUDGET PROJECTED BUDGET PY Budget
CHARGES FOR CURRENT SERVICES
3601 Sale of Documents 979 4 000 1 000 1 000
3602 Use Variance Permits 52 360 45 000 35 000 40 000
3603 Rezoning Fees 2 500 2 000 2 000 2 000
3604 Assessment Searches 720 500 500 500
3605 Plat Recording Fees 15 288 10 000 7 000 7 000
3607 Election Filing Fees 30
3613 Misc General Government 8 026 10 000 10 000 10 000
3614 Admin Charge 2 Constr 146 687 120 000 50 000 50 000
3615 Admin Charge 5 Street Re Constr 32 000
3617 Engineering General 1 336 1 000 1 000 1 000
3619 Investment Management Fee 75 000 75 000 75 000 75 000
3629 Misc Public Safety 6 138 4 000 4 000 5 000
3630 Recreation Program Fees 24 813 30 000 30 000 38 100
3631 Recreation Center 121 671 135 000 125 000 114 000
3633 Park Equipment Rental 222 200 200 200
3634 Park Facility Usage Fee 9 747 12 000 12 000 12 000
3635 Watercraft Rental 4466 4 000 4 000 4 000
3636 Self Supporting Programs 172 924 160 000 175 000 180 000
3637 Senior Programs 27 078 30 000 30 000 30 000
3638 Food Concessions 11 971 12 000 12 000 12 000
3639 MiSC Park Rec 765 800 800 800
3641 Youth Sport Donation 32
3649 MiSC Public Works 14400 5 000 5 000 5 000
3651 Merchandise Sales 1 886 1 500
3670 Internment Fee 250
TOTAL CURRENT SERVICES 699 290 660 500 579 500 621 100 6 0
OTHER REVENUE
3801 Interest Earnings 133 405 70 000 110 000 125 000
3802 Equipment Rental Sale 107 384 110 000 110 000 125 000
3803 Building Rental 1 613
3804 Land Sale 1 600
3807 Donations 26 122 20 000 20 000 20 000
3808 Ins Recoveries Reimburse 10 024 5 000 5 000 5 000
3816 SAC Retainer 70 169 5 000 155 000 5 000
3818 Sur Tax Retainer 954 1 500 1 500 1 500
3820 Misc Other Revenue 110 5 000 1 000 1 000
3829 Interest Penalties Other 500 500 500
3903 Refunds Reimbu rsements 34 546 30 000 30 000 30 000
3910 Misc Revenue 323
TOTAL OTHER REVENUE 386 249 247 000 433 000 313 000 26 7
TOTAL GENERAL FUND REVENUE 9 116 869 9 062 400 9 077 400 9 318 300 2 8
TOTAL GENERAL FUND EXPENDITURES 9 318 300
NET LEVY REMAINING Use of Gen Fund Reserves
195
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1110 Legislative
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4020 Salaries Wages Temp 27 100 31 600 31 600 0 0
4030 Contributions Retirement 2 083 2 500 2 500 0 0
4050 Workers Compensation 72 100 100 0 0
TOTAL PERSONAL SERVICES 29 256 34 200 34 200 0 0
4210 Books Periodicals 200 200 0 0
TOTAL MATERIALS SUPPLIES 200 200 0 0
4300 Fees Services 7 381 13 000 8 000 38 5
4330 Postage 5 831 6 000 6 500 8 3
4340 Printing Publishing 44 631 37 000 47 000 27 0
4360 Subscriptions Memberships 27 730 28 000 29 000 3 6
4370 Travel Training 6 545 3 000 8 000 166 7
4375 Promotional Expense 999 2 000 2 000 0 0
TOTAL CONTRACTUAL SERVICES 93 118 89 000 100 500 12 9
TOTAL LEGISLATIVE 122 373 123 400 134 900 9 3
196
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1120 Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 282 694 295 000 294 000 0 3
4020 Salaries Wages Temp 6 000 6 000 0 0
4030 Contributions Retirement 35453 41 1 00 37 800 8 0
4040 Contributions I nsurance 34 725 42 300 35 500 16 1
4050 Workers Compensation 1 001 1 100 1 200 9 1
TOTAL PERSONAL SERVICES 353 872 385 500 374 500 2 9
4120 Supplies Equipment 901 200 200 0 0
4130 Supplies Program 100 100 0 0
4210 Books Periodicals 100 200 200 0 0
TOTAL MATERIALS SUPPLIES 1 001 500 500 0 0
4300 Fees Services 770 2 000 2 000 0 0
4310 Telephone 1 566 1 500 2400 60 0
4330 Postage 20 716 13 000 16 000 23 1
4340 Printing Publishing 4 169 1 500 1 500 0 0
4360 Subscriptions Memberships 3 987 2 500 4 000 60 0
4370 Travel Training 6 833 5 500 8 000 45 5
4380 Mileage 7 239 7 200 7 200 0 0
4410 Rental Equipment 18 778 18 500 18 500 0 0
4530 Repair Maintenance Equip 172 300 300 0 0
4807 Property Tax Expense 2 916 0 0
4933 Sales Tax 0 0
TOTAL CONTRACTUAL SERVICES 67 146 52 000 59 900 15 2
4703 Office Equipment 0 0
TOTAL CAPITAL OUTLAY 0 0
TOTAL ADMINISTRATION 422 020 438 000 434 900 0 7
197
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1130 Finance
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 172 006 177 900 168 000 5 6
4011 Overtime 541 200 200 0 0
4030 Contributions Retirement 22 191 24 700 24 000 2 8
4040 Contributions I nsurance 21 807 22 200 17400 21 6
4050 Workers Compensation 641 1 000 1 000 0 0
TOTAL PERSONAL SERVICES 217 186 226 000 210 600 6 8
4120 Supplies Equipment 50 200 200 0 0
4210 Books Periodicals 100 100 0 0
TOTAL MATERIALS SUPPLIES 50 300 300 0 0
4300 Fees Services 52 373 42 000 55 000 31 0
4301 Fees Financial Audit 20 362 38 000 25 000 34 2
4310 Telephone and Communications 283 300 300 0 0
4330 Postage 200 200 0 0
4340 Printing Publishing 1426 1 500 1 500 0 0
4360 Subscriptions Memberships 285 400 400 0 0
4370 Travel Training 4 202 9 000 9 000 0 0
4530 Repair Maintenance Equip 100 100 0 0
TOTAL CONTRACTUAL SERVICES 78 931 91 500 91 500 0 0
4703 Office Equipment 200 200 0 0
TOTAL CAPITAL OUTLAY 200 200 0 0
TOTAL FINANCE 296 167 318 000 302 600 4 8
198
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1140 Legal
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4302 Fees Legal 158 768 168 000 168 000 0 0
TOTAL CONTRACTUAL SERVICES 158 768 168 000 168 000 0 0
TOTAL LEGAL 158 768 168 000 168 000 0 0
199
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1150 Property Assessment
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4300 Fees Services 94 264 100 000 101 500 1 5
4340 Printing Publishing 100 100 0 0
TOTAL CONTRACTUAL SERVICES 94 264 100 100 101 600 1 5
TOTAL PROPERTY ASSESSMENT 94 264 100 100 101 600 1 5
200
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1160 MIS
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 119 360 124 300 129 500 4 2
4030 Contributions Retirement 15 959 17 300 18 300 5 8
4040 Contributions I nsurance 16 250 17 900 15 300 14 5
4050 Workers Compensation 427 500 500 0 0
TOTAL PERSONAL SERVICES 151 996 160 000 163 600 2 3
4150 Maintenance Materials 743 1 300 1 300 0 0
4210 Books Periodicals 128 600 600 0 0
4220 Software Licenses 8 908 0 0
4260 Small Tools Equipment 248 500 500 0 0
TOTAL MATERIALS SUPPLIES 10 027 2400 2400 0 0
4300 Fees Services 57 370 78 100 86 100 10 2
4310 Telephone 981 1 400 1 400 0 0
4320 Utilities 11 160 12 600 12 600 0 0
4350 Cleaning and Waste Removal 53 0 0
4370 Travel Training 23 351 21 700 14 200 34 6
4530 Repair Maintenance Equip 3 820 5 000 5 000 0 0
4933 Sales Tax 216 0 0
TOTAL CONTRACTUAL SERVICES 96 951 118 800 119 300 04
TOTAL M tS 258 974 281 200 285 300 1 5
201
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1170 City Hall
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 48 316 49 600 50 300 14
4011 Overtime Reg 3 780 2 000 3 500 75 0
4030 Contributions Retirement 7 005 6 900 7 100 2 9
4040 Contributions Insu rance 6 206 6 600 5 900 10 6
4050 Workers Compensation 1 536 1 500 1 600 6 7
TOTAL PERSONAL SERVICES 66 844 66 600 68400 2 7
4110 Supplies Office 37 793 37 000 37 000 0 0
4120 Supplies Equipment 193 1 000 1 000 0 0
4140 Supplies Vehicles 329 1 000 1 000 0 0
4150 Maintenance Materials 4 077 3 000 3 000 0 0
4260 Small Tools Equipment 68 500 300 40 0
TOTAL MATERIALS SUPPLIES 42460 42 500 42 300 0 5
4300 Fees Services 3 176 6 000 6 000 0 0
4310 Telephone 14 189 16 000 16 000 0 0
4320 Utilities 49 885 52 000 54 600 5 0
4350 Cleaning Waste Removal 34 108 33 000 35 000 6 1
4440 License Registration 15 100 100 0 0
4483 Insurance General Liability 133 119 205 500 163 000 20 7
4510 Repair Maintenance Building 5 609 5 000 5 000 0 0
4520 Repair Maintenance Vehicles 99 400 400 0 0
4530 Repair Maintenance Equip 2441 1 500 2 000 33 3
4933 Sales Tax 44 0 0
TOTAL CONTRACTUAL SERVICES 242 684 319 500 282 100 11 7
TOTAL CITY HALL 351 988 428 600 392 800 8 4
202
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1180 Elections
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4020 Salaries Wages Temp 30 958 12 500 20 500 64 0
4030 Contributions Retirement 217 1 000 1 000 0 0
TOTAL PERSONAL SERVICES 31 175 13 500 21 500 59 3
4110 Office Supplies 372 200 200 0 0
4300 Fees Services 2 674 3 000 3 000 0 0
4340 Printing Publishing 4 057 2 000 2 000 0 0
4370 Travel Training 2 577 1 000 1 200 20 0
TOTAL CONTRACTUAL SERVICES 9 679 6 200 6400 3 2
TOTAL ELECTIONS 40 854 19 700 27 900 41 6
203
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1190 Library Building
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4150 Maintenance Materials 3 545 2 000 3 000 50 0
4260 Small Tools Equipment 19 0 0
TOTAL MATERIALS SUPPLIES 3 564 2 000 3 000 50 0
4300 Fees Services 559 1 000 1 000 0 0
4310 Telephone 2 040 2 200 2 200 0 0
4320 Utilities 67 872 63 000 67 000 6 3
4350 Cleaning Waste Removal 32 169 30 000 33 000 10 0
4510 Repair Maintenance Building 5 942 2 000 2 000 0 0
4530 Repair Maintenance Equip 1 772 2 000 2 000 0 0
TOTAL CONTRACTUAL SERVICES 110 354 100 200 107 200 7 0
TOTAL LIBRARY 113 918 102 200 110 200 7 8
204
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1210 Police Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 55 983 58 800 60 200 24
4030 Contributions Retirement 7 570 8 200 8 500 3 7
4040 Contributions Insurance 6 164 6 700 5 900 11 9
4050 Workers Compensation 382 500 500 0 0
TOTAL PERSONAL SERVICES 70 099 74 200 75 100 1 2
4130 Program Supplies 3 973 5 000 5 000 0 0
4300 Fees Services 1 236 172 1 250 000 1 417 500 134
4375 Promotional Expense 613 4 500 4 500 0 0
TOTAL CONTRACTUAL SERVICES 1 240 758 1 259 500 1427 000 13 3
TOTAL POLICE ADMINISTRATION 1 310 857 1 333 700 1 502 100 12 6
205
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1220 Fire Prevention Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 128 215 133 500 132 000 1 1
4011 Overtime 218 1 000 1 000 0 0
4020 Salaries Wages Temp 135 284 160 000 160 000 0 0
4030 Contributions Retirement 178 853 187 000 187 000 0 0
4040 Contributions I nsurance 18 089 19 600 16 100 17 9
4050 Workers Compensation 12 762 14 500 14 500 0 0
TOTAL PERSONAL SERVICES 473421 515 600 510 600 1 0
4120 Supplies Equipment 9 862 11 000 11 000 0 0
4130 Supplies Program 5 808 5 000 5 000 0 0
4140 Supplies Vehicles 4 216 7 000 7 000 0 0
4150 Maintenance Materials 484 1 000 1 000 0 0
4170 Motor Fuels and Lubrication 292 0 0
4210 Books Periodicals 1 230 1 000 1 000 0 0
4240 Uniforms Clothing 12 940 13 500 13 500 0 0
4260 Small Tools Equipment 4467 5 000 5 000 0 0
4290 Misc Materials Supplies 3 820 3 500 3 500 0 0
TOTAL MATERIALS SUPPLIES 43 118 47 000 47 000 0 0
4300 Fees Services 11 369 16 500 16 500 0 0
4310 Telephone 9 087 6 000 6 000 0 0
4320 Utilities 24462 23 000 23 000 0 0
4330 Postage 76 0 0
4350 Cleaning Waste Removal 5 339 7 000 7 000 0 0
4360 Subscriptions Memberships 1 533 3 000 3 000 0 0
4370 Travel Training 19 012 10 000 10 000 0 0
4375 Promotional Expense 8483 9 000 9 000 0 0
4440 License Registration 18 0 0
4483 Insurance General Liability 1 405 1 000 1 000 0 0
4510 Repair Maintenance Building 4 567 7 000 7 000 0 0
4520 Repair Maintenance Vehicles 4 165 7 000 7 000 0 0
4530 Repair Maintenance Equip 11 150 5 000 5 000 0 0
4531 Repair Maintenance Radios 6 966 9 000 9 000 0 0
4901 Refunds Reim bu rsements 819 0 0
Contribution for Performance 12 500 12 500 100 0
4933 Sales Tax 389 0 0
TOTAL CONTRACTUAL SERVICES 108 840 116 000 116 000 0 0
TOTAL FIRE PREVENTION ADMIN 625 379 678 600 673 600 0 7
206
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1250 Code Enforcement
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 458 938 524 000 484400 7 6
4011 Overtime Reg 4 106 2 000 4 000 100 0
4020 Salaries Wages Temp 30 000 30 000 0 0
4030 Contributions Retirement 60 022 72 900 72 900 0 0
4040 Contributions I nsurance 69 566 91 700 64 100 30 1
4050 Workers Compensation 2 843 3400 3400 0 0
TOTAL PERSONAL SERVICES 595475 724 000 658 800 9 0
4120 Supplies Equipment 35 1 000 1 000 0 0
4130 Supplies Program 127 800 800 0 0
4140 Supplies Vehicles 1487 1 500 1 500 0 0
4210 Books Periodicals 889 3 500 3 500 0 0
4240 Uniforms Clothing 891 1 500 1 500 0 0
4260 Small Tools Equipment 73 400 400 0 0
TOTAL MATERIALS SUPPLIES 3 501 8 700 8 700 0 0
4300 Fees Services 83 1 000 1 000 0 0
4310 Telephone 2 858 4 000 4 000 0 0
4340 Printing Publishing 1 017 2 000 2 000 0 0
4360 Subscriptions Memberships 520 1 000 1 000 0 0
4370 Travel Training 5 561 11 000 11 000 0 0
4375 Promotional Expense 200 200 0 0
4440 License Registration 371 200 200 0 0
4520 Repair Maintenance Vehicles 639 1 500 1 500 0 0
4530 Repair Maintenance Equip 1 488 2 500 2 500 0 0
4901 Refunds Rei mbursements 550 0 0
4933 Sales Tax 7 0 0
TOTAL CONTRACTUAL SERVICES 13 093 23400 23400 0 0
TOTAL CODE ENFORCEMENT 612 069 756 100 690 900 8 6
207
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1260 Community Service
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INCDEC
4020 Salaries Wages Temp 37 013 47 000 47 000 0 0
4021 Overtime Temp 1 370 1 000 1 400 40 0
4030 Contributions Retirement 5 312 4 900 5 500 12 2
4040 Contributions I nsurance 568 600 600 0 0
4050 Workers Compensation 794 700 800 14 3
TOTAL PERSONAL SERVICES 45 056 54 200 55 300 2 0
4120 Supplies Equipment 903 500 1 000 100 0
4130 Supplies Program 83 700 500 28 6
4140 Supplies Vehicles 1 235 700 700 0 0
4210 Books Periodicals 200 200 0 0
4240 Uniforms Clothing 2 032 1 800 1 600 11 1
TOTAL MATERIALS SUPPLIES 4 252 3 900 4 000 2 6
4300 Fees Services 14 271 7 000 9 600 37 1
4310 Telephone 896 1 000 1 000 0 0
4340 Printing Publishing 316 500 500 0 0
4360 Subscriptions Memberships 105 300 300 0 0
4370 Travel Training 644 700 700 0 0
4440 License Registration 15 0 0
4520 Repair Maintenance Vehicles 170 1 000 1 000 0 0
4530 Repair Maintenance Equip 99 300 300 0 0
4531 Repair Maintenance Radios 303 300 300 0 0
TOTAL CONTRACTUAL SERVICES 16 819 11 100 13 700 234
TOTAL COMMUNITY SERVICE 66 127 69 200 73 000 5 5
208
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1310 Engineering
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 342 989 383 900 395 800 3 1
4011 Overtime Reg 1 595 1 000 1 500 50 0
4020 Salaries Wages Temp 10 980 10 000 12 000 20 0
4021 Temp Seasonal Overtime 8 0 0
4030 Contributions Retirement 46412 53400 56 900 6 6
4040 Contributions I nsurance 35 977 46 300 37 700 18 6
4050 Workers Compensation 2 178 2 800 2 600 7 1
4060 Unemployment 11 845 0 0
TOTAL PERSONAL SERVICES 451 984 497400 506 500 1 8
4120 Supplies Equipment 32 200 200 0 0
4140 Supplies Vehicles 264 300 300 0 0
4210 Books Periodicals 335 400 400 0 0
TOTAL MATERIALS SUPPLIES 631 900 900 0 0
4300 Fees Services 58 815 18 000 18 000 0 0
4303 Engineering Consulting 2 008 0 0
4310 Telephone 1 845 2 000 2 000 0 0
4330 Postage 400 400 0 0
4340 Printing Publishing 1 297 1 100 1 100 0 0
4360 Subscriptions Memberships 1 405 1 200 1 200 0 0
4370 Travel Training 1 485 3 000 3 000 0 0
4380 Mileage 200 300 50 0
4440 License Registration 29 300 300 0 0
4520 Repair Maintenance Vehicles 500 500 0 0
4530 Repair Maintenance Equip 1 879 3 000 3 000 0 0
4531 Repair Maintenance Radios 100 100 0 0
4933 Sales Tax 22 0 0
TOTAL CONTRACTUAL SERVICES 68 784 29 800 29 900 0 3
4705 Other Equipment 300 300 0 0
TOTAL CAPITAL OUTLAY 300 300 0 0
TOTAL ENGINEERING 521 399 528400 537 600 1 7
209
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1320 Street Maintenance
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INCIlDEC
4010 Salaries Wages Reg 415 251 436400 446 000 2 2
4011 Overtime Reg 5 104 10 000 5 500 45 0
4020 Salaries Wages Temp 8 748 17 800 10 000 43 8
4030 Contributions Retirement 58 904 60 700 63 100 4 0
4040 Contributions I nsurance 59 172 72 900 55 000 24 6
4050 Workers Compensation 18 960 17 500 20 100 14 9
TOTAL PERSONAL SERVICES 566 140 615 300 599 700 2 5
4120 Supplies Equipment 35 253 47 000 44 000 64
4140 Supplies Vehicles 24 623 28 000 28 000 0 0
4150 Maintenance Materials 53 319 55 000 55 000 0 0
4160 Chemicals 67 0 0
4170 Motor Fuels Lubricants 2 574 0 0
4210 Books Periodicals 100 100 0 0
4240 Uniforms Clothing 3 603 3 700 3 700 0 0
4260 Small Tools Equipment 392 2 700 2 700 0 0
TOTAL MATERIALS SUPPLIES 119 830 136 500 133 500 2 2
4300 Fees Services 179 1 000 1 000 0 0
4310 Telephone 3 292 3 500 3 500 0 0
4340 Printing Publishing 59 300 300 0 0
4350 Cleaning Waste Removal 19 300 300 0 0
4360 Subscriptions Memberships 1 118 100 100 0 0
4370 Travel Training 769 1 500 1 500 0 0
4410 Rental Equipment 1 500 1 500 0 0
4440 License Registration 571 600 600 0 0
4510 Repair Maintenance Building 500 500 0 0
4520 Repair Maintenance Vehicles 5 905 2 400 3 500 45 8
4530 Repair Maintenance Equip 1 020 5 500 5 500 0 0
4531 Repair Maintenance Radios 2 000 500 75 0
4540 Repair Maintenance Streets 17 650 500 500 0 0
4560 Repair Maintenance Signs 12455 13 700 13 700 0 0
4933 Sales Tax 1493 0 0
TOTAL CONTRACTUAL SERVICES 44 530 33400 33 000 1 2
4703 Office Equipment 300 300 0 0
4705 Other Equipment 700 1 000 1 000 0 0
TOTAL CAPITAL OUTLAY 700 1 300 1 300 0 0
TOTAL STREET MAINTENANCE 731 200 786 500 767 500 2 4
210
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1350 Street Lighting Signals
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INCDECl
4120 Supplies Equipment 4445 4 500 4 500 0 0
TOTAL MATERIALS SUPPLIES 4445 4 500 4 500 0 0
4300 Fees Services 300 300 0 0
4310 Telephone 499 600 600 0 0
4320 Utilities 282 764 290 000 295 000 1 7
4530 Repair Maintenance Equip 1 678 2 500 2 500 0 0
4565 Repair Maintenance Lights Signals 11 499 17 000 17 000 0 0
TOTAL CONTRACTUAL SERVICES 296440 310400 315400 1 6
TOTAL STREET LIGHT SIGNALS 300 885 314 900 319 900 1 6
211
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1370 City Garage
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 202 322 187 400 177 700 5 2
4011 Overtime Reg 4 307 6 500 6 500 0 0
4030 Contributions Retirement 23 196 26 100 25 100 3 8
4040 Contri butions I nsu rance 28 738 32 000 26 600 16 9
4050 Workers Compensation 5 584 6 000 5 800 3 3
TOTAL PERSONAL SERVICES 264 146 258 000 241 700 6 3
4120 Supplies Equipment 1 392 3 300 3 300 0 0
4140 Supplies Vehicles 371 500 500 0 0
4150 Maintenance Materials 1 530 1 000 1 000 0 0
4170 Motor Fuels Lubricants 95 799 140 000 140 000 0 0
4240 Uniforms Clothing 1 586 1 200 1 200 0 0
4260 Small Tools Equipment 3 062 4400 4400 0 0
TOTAL MATERIALS SUPPLIES 103 739 150400 150400 0 0
4300 Fees Services 1 425 1 300 1 300 0 0
4310 Telephone 2 991 3 800 3 800 0 0
4320 Utilities 19 200 23 000 23 000 0 0
4340 Printing Publishing 59 100 100 0 0
4350 Cleaning Waste Removal 9 186 6 100 7400 21 3
4360 Subscriptions Memberships 200 200 0 0
4370 Travel Training 170 1 500 1 500 0 0
4410 Rental Equipment 349 500 500 0 0
4440 License Registration 65 500 500 0 0
4510 Repair Maintenance Building 6 269 4 000 4 000 0 0
4520 Repair Maintenance Vehicles 37 300 300 0 0
4530 Repair Maintenance Equip 1 586 3 800 3 800 0 0
4531 Repair Maintenance Radios 100 100 0 0
4933 Sales Tax 32 0 0
TOTAL CONTRACTUAL SERVICES 41 368 45 200 46 500 2 9
4703 Office Equipment 292 500 500 0 0
4705 Other Equipment 4 773 5 500 5 500 0 0
TOTAL CAPITAL OUTLAY 5 065 6 000 6 000 0 0
TOTAL CITY GARAGE 414 318 459 600 444 600 3 3
212
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1410 Planning Commission
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4210 Books Periodicals 200 200 0 0
TOTAL MATERIALS SUPPLIES 200 200 0 0
4340 Printing Publishing 4 600 3 000 3 000 0 0
4360 Subscriptions Memberships 200 200 0 0
4370 Travel Training 601 800 800 0 0
TOTAL CONTRACTUAL SERVICES 5 201 4 000 4 000 0 0
TOTAL PLANNING COMMISSION 5 201 4 200 4 200 0 0
213
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1420 Planning Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INCDEC
4010 Salaries Wages Reg 271 977 283 200 289 700 2 3
4030 Contributions Retirement 35 822 39400 41 000 4 1
4040 Contributions I nsurance 38 246 39 200 35 900 84
4050 Workers Compensation 965 1 000 1 200 20 0
TOTAL PERSONAL SERVICES 347 011 362 800 367 800 14
4120 Supplies Equipment 77 300 300 0 0
4130 Supplies Program 7 100 100 0 0
4140 Supplies Vehicles 81 100 100 0 0
4210 Books Periodicals 200 200 0 0
TOTAL MATERIALS SUPPLIES 165 700 700 0 0
4300 Fees Services 45 5 000 5 000 0 0
4310 Telephone 77 200 200 0 0
4340 Printing Publishing 200 200 0 0
4360 Subscriptions Memberships 1 150 1 500 1 500 0 0
4370 Travel Training 2 885 7 000 6400 8 6
4440 License Registration 15 600 0 0
4520 Repair Maintenance Vehicles 200 200 0 0
TOTAL CONTRACTUAL SERVICES 4 172 14 100 14 100 0 0
TOTAL PLANNING ADMINISTRATION 351 347 377 600 382 600 1 3
214
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1430 Senior Commission
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 15 290 15 900 16 200 1 9
4030 Contributions Retirement 2 049 2 200 2 300 4 5
4040 Contributions nsurance 1 572 1 700 1 500 11 8
4050 Workers Compensation 54 100 100 0 0
TOTAL PERSONAL SERVICES 18 965 19 900 20 100 1 0
4300 Fees Services 8 416 9 500 14 500 52 6
4370 Travel Training 18 200 200 0 0
4375 Promotional Expense 32 500 500 0 0
TOTAL CONTRACTUAL SERVICES 8 466 10 200 15 200 49 0
TOTAL SENIOR COMMISSION 27 431 30 100 35 300 17 3
215
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1510 Park Ree Commission
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4130 Supplies Program 100 100 0 0
4210 Books Periodicals 100 100 0 0
TOTAL MATERIALS SUPPLIES 200 200 0 0
4340 Printing Publishing 1 138 900 900 0 0
4360 Subscriptions Memberships 700 700 0 0
4370 Travel Training 380 400 400 0 0
TOTAL CONTRACTUAL SERVICES 1 517 2 000 2 000 0 0
TOTAL PARK REC COMMISSION 1 517 2 200 2 200 0 0
216
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1520 Park Rec Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 86 525 89 200 95 200 6 7
4030 Contributions Retirement 11 229 12400 13400 8 1
4040 Contributions I nsurance 10 143 11 400 9 500 16 7
4050 Workers Compensation 307 400 400 0 0
TOTAL PERSONAL SERVICES 108 205 113 400 118500 4 5
4120 Supplies Equipment 106 500 500 0 0
4130 Supplies Program 200 200 0 0
4210 Books Periodicals 100 100 0 0
4240 Uniforms Clothing 200 200 0 0
TOTAL MATERIALS SUPPLIES 106 1 000 1 000 0 0
4300 Fees Services 1 100 1 100 0 0
4310 Telephone 587 900 900 0 0
4330 Postage 1 307 400 400 0 0
4340 Printing Publishing 14 166 1 500 1 500 0 0
4360 Subscriptions Memberships 1 962 1 200 1 600 33 3
4370 Travel Training 1 802 3 800 3 800 0 0
4380 Mileage 27 200 300 50 0
4807 Property Tax Expense 12 0 0
TOTAL CONTRACTUAL SERVICES 19 863 9 100 9 600 5 5
TOTAL PARK REC ADMINISTRATION 128 174 123 500 129 100 4 5
217
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1530 Recreation Center
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INCICDEC
4010 Salaries Wages Reg 41 200 43 300 43 700 0 9
4020 Salaries Wages Temp 123 342 132 000 132 000 0 0
4030 Contributions Retirement 21 617 28 000 28 000 0 0
4040 Contributions Insurance 6 063 6600 5 800 12 1
4050 Workers Compensation 3 049 4 200 3 200 23 8
4060 Unemployment 82 0 0
TOTAL PERSONAL SERVICES 195 354 214 100 212 700 0 7
4120 Supplies Equipment 672 8 000 8 000 0 0
4130 Supplies Program 12 334 3 000 3 000 0 0
4150 Maintenance Materials 500 500 0 0
TOTAL MATERIALS SUPPLIES 13 006 11 500 11 500 0 0
4300 Fees Services 284 500 29 700 5840 0
4310 Telephone 3 137 1 500 2 500 66 7
4320 Utilities 36 382 36 500 37 500 2 7
4340 Printing and Publishing 524 0 0
4360 Subscriptions Memberships 253 300 300 0 0
4370 Travel Training 164 400 400 0 0
4375 Promotional Expense 1 598 300 1 600 433 3
4510 Repair Maintenance Building 2 904 2 500 3 000 20 0
4530 Repair Maintenance Equip 439 1 000 1 000 0 0
4590 Misc Contractual Services 2 622 500 1 000 100 0
TOTAL CONTRACTUAL SERVICES 48 307 43 500 77 000 77 0
TOTAL RECREATION CENTER 256 666 269 100 301 200 11 9
218
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1540 Lake Ann Park Operations
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INCUDEC
4020 Salaries Wages Temp 9 130 12 800 12 200 4 7
4021 Overtime Temp 60 500 500 0 0
4030 Contributions Retirement 703 800 800 0 0
4050 Workers Compensation 215 300 300 0 0
TOTAL PERSONAL SERVICES 10 108 14400 13 800 4 2
4120 Supplies Equipment 3 349 3 800 100 0
4130 Supplies Program 10 654 9 100 8 600 5 5
4240 Uniforms Clothing 500 500 500 0 0
TOTAL MATERIALS SUPPLIES 14 503 13400 9 100 32 1
4300 Fees Services 26 759 31 800 31 800 0 0
4310 Telephone 3 069 3 600 3 600 0 0
4320 Utilities 9 171 8 300 15 000 80 7
4340 Printing Publishing 133 300 1 000 233 3
TOTAL CONTRACTUAL SERVICES 39 132 44 000 51 400 16 8
TOTAL LAKE ANN PARK OPERATIONS 63 743 71 800 74 300 3 5
219
CITY OF CHANHA55EN
2008 BUDGET
101 General Fund
1550 Park Maintenance
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 409 215 422 800 435400 3 0
4011 Overtime Reg 6 600 8 000 8000 0 0
4020 Salaries Wages Temp 79 339 79 000 82 000 3 8
4021 Overtime Temp 1 094 3 000 3 000 0 0
4030 Contributions Retirement 60 628 58 800 61 700 4 9
4040 Contributions I nsurance 64 125 71 000 59 700 15 9
4050 Workers Compensation 11 460 9 500 11 500 21 1
TOTAL PERSONAL SERVICES 632460 652 100 661 300 1 4
4120 Supplies Equipment 32 762 32 000 32 000 0 0
4140 Supplies Vehicles 6 237 8 000 8000 0 0
4150 Maintenance Materials 35 976 33 000 33 000 0 0
4151 Irrigation Materials 2 604 3 000 3 000 0 0
4240 Uniforms Clothing 1 344 2 800 2 800 0 0
4260 Small Tools Equipment 804 2 500 2 500 0 0
TOTAL MATERIALS SUPPLIES 79 727 81 300 81 300 0 0
4300 Fees Services 20 455 18 000 22 000 22 2
4310 Telephone 3 604 3 700 3 700 0 0
4320 Utilities 6 952 6 000 6 000 0 0
4340 Printing Publishing 203 400 400 0 0
4350 Cleaning Waste Removal 5 382 9 000 6000 33 3
4360 Subscriptions Memberships 588 400 400 0 0
4370 Travel Training 563 2 000 2 000 0 0
4400 Rental Land Buildings 26 068 23 500 28 500 21 3
4410 Rental Equipment 4 643 2 000 2 000 0 0
4440 License Registration 450 700 700 0 0
4510 Repair Maintenance Building 2 191 3 000 3 000 0 0
4520 Repair Maintenance Vehicles 372 2 500 2 500 0 0
4530 Repair Maintenance Equip 17 016 6 500 6 500 0 0
4531 Repair Maintenance Radios 500 500 0 0
4560 Repair Maintenance Signs 3 795 4 000 4 000 0 0
4933 Sales Tax 83 0 0
TOTAL CONTRACTUAL SERVICES 92 364 82 200 88 200 7 3
4705 Other Equipment 3 956 4 000 4 000 0 0
TOTAL CAPITAL OUTLAY 3 956 4 000 4 000 0 0
TOTAL PARK MAINTENANCE 808 507 819 600 834 800 1 9
220
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1560 Senior Citizens Center
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INCt DEC
4010 Salaries Wages Reg 25 652 26 900 32 200 19 7
4030 Contributions Retirement 3 503 3 700 4 500 21 6
4040 Contributions I nsurance 300 100 0
4050 Workers Compensation 90 200 200 0 0
TOTAL PERSONAL SERVICES 29 246 31 100 36 900 18 6
4120 Supplies Equipment 410 300 300 0 0
4130 Supplies Program 3 143 3 500 4 000 14 3
TOTAL MATERIALS SUPPLIES 3 553 3 800 4 300 13 2
4300 Fees Services 17 570 16 500 18 500 12 1
4340 Printing Publishing 100 100 0 0
4350 Cleaning Waste Removal 200 200 0 0
4360 Subscriptions Memberships 20 100 100 0 0
4370 Travel Training 139 300 300 0 0
4375 Promotional Expense 164 200 200 0 0
4380 Mileage 95 100 100 0 0
TOTAL CONTRACTUAL SERVICES 17 988 17 500 19 500 11 4
TOTAL SENIOR CITIZENS CENTER 50 787 52400 60 700 15 8
221
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1600 Recreation Programs
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INCDEC
4010 Salaries Wages Reg 81 009 84 600 85 200 0 7
4020 Salaries Wages Temp 35 813 64 300 57 100 11 2
4021 Overtime Temp 354 200 400 100 0
4030 Contributions Retirement 13 635 14 900 12 500 16 1
4040 Contributions I nsurance 9 906 10 600 9 400 11 3
4050 Workers Compensation 1 157 1 000 1 200 20 0
TOTAL PERSONAL SERVICES 141 875 175 600 165 800 5 6
4120 Supplies Equipment 2 000 2 000 0 0
4130 Supplies Program 13 555 13 100 13 600 3 8
4240 Uniforms Clothing 555 1 500 1 500 0 0
TOTAL MATERIALS SUPPLIES 14 110 16 600 17 100 3 0
4300 Fees Services 45 019 47 400 57 200 20 7
4310 Telephone 1 252 3 300 3 200 3 0
4320 Utilities 2 596 2 500 2 800 12 0
4330 Postage 200 200 0 0
4340 Printing Publishing 3 587 4 400 4 400 0 0
4360 Subscriptions Memberships 280 0 0
4370 Travel Training 220 500 500 0 0
4380 Mileage 75 500 500 0 0
4400 Rental Land Buildings 4 096 5 500 6 500 18 2
4410 Rental Equipment 11 291 17 700 18 200 2 8
TOTAL CONTRACTUAL SERVICES 68415 82 000 93 500 14 0
TOTAL RECREATION PROGRAMS 224 400 274 200 276 400 0 8
222
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1700 Self Supporting Programs
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 20 252 21 200 21 300 0 5
4020 Salaries Wages Temp 2 882 13 600 100 0
4030 Contributions Retirement 3 021 3 300 3 100 6 1
4040 Contributions Insurance 2476 2 600 2400 7 7
4050 Workers Compensation 106 100 100 0 0
TOTAL PERSONAL SERVICES 28 738 40 800 26 900 34 1
4120 Supplies Equipment 277 600 400 33 3
4130 Supplies Program 7432 8 000 4 800 40 0
TOTAL MATERIALS SUPPLIES 7 709 8 600 5 200 39 5
4300 Fees Services 100 377 82 100 68 000 17 2
TOTAL CONTRACTUAL SERVICES 100 377 82 100 68 000 17 2
TOTAL SELF SUPPORTING PROGRAMS 136 823 131 500 100 100 23 9
223
City of Chanhassen MN
Capital Improvement Program
2008 thru 2012
DEPARTMENT SUMMARY
Department 2008 2009 2010
Major Equipment 849 100 686 600 1 531 600
Municipal Buildings 8 070 000 300 000 2 000 000
Park Trail Improvements 669 800 1 285 000 216 000
Planning 30 000 75 000
Sanitary Sewer Improvements 670 000 401 000 2 910 000
Street Improvements 11 170 000 3 895 000 8 185 000
Surface Water Management 1 760 000 1 170 000 1 110 000
Water System Improvements 3 930 000 770 000 3 515 000
GRAND TOTAL 27148 900 8 682 600 19 467 600
2011 2012
876 700 463 500
125 000
771 000 696 000
305 000 100 000
1 585 000 7 785 000
670 000 970 000
3 745 000 12 245 000
7 952 700 22384 500
Total
4 407 500
10 495 000
3 637 800
105 000
4 386 000
32 620 000
5 680 000
24 205 000
85 538 300
224
City of Chanhassen MN
Capital Improvement Program
2008 thru 2012
PROJECTS BY DEPARTMENT
Department Project Priority 2008 2009 2010 2011 2012 Total
IMajor E9ui ment
Fire Dept SCBA Equipment EOD04 n a 5 000 5 000 5 000 5 000 20 000
Laptop Computers EOD09 n a 50 000 50 000
PPE TurnoutHelmets EOD10 n a 15 000 15 000 15 000 15 000 60 000
Computer Network Equipment PurchaseS Upgrades EOD13 nla 97 700 104 500 116 800 90 900 93 200 503 100
Telecommunication Purchases Upgrades EOD14 nla 6 200 50 000 20 000 6 000 6 000 88 200
Community Dev Light Duty Trucks EOD15 n a 54 000 30 000 28 000 29 000 141 000
Dump Plow Truck ReplacementsAdditions EOD16 n a 161 000 371 800 169 000 701 800
Vibratory Roll Packer EOD 19 n a 45 000 45 000
Equipment Trailers EOD21 n a 25 000 25 000
Tar Kettle EOD22 nla 30 000 30 000
Ford 555C Backhoe EOD23 n a 80 000 80 000
Line Striper EOD25 n a 9 000 9 000
AudioNisual Equipment EOD26 nla 10 000 10 000 10 000 10 000 10 000 50 000
Groundsmaster 580 Mower Replacement EOD28 nla 82 000 82 000
Light Duty Trucks Public Works EOD29 nla 32 000 32 000 64 000
Sewer Bobcat Snow Accessories EOD31 nla 7 000 7 000
Grounds Mower Replacement EOD34 n a 37 000 37 000
Mailing Folder Inserter EOD41 n a 20 000 20 000
Software Purchases EOD48 nla 30 500 42 000 37 000 22 000 22 000 153 500
Computerized Records Retention System EOD49 n a 12 700 31 300 8 000 9 000 61 000
Light Duty Trucks Parks EOD52 n a 98 000 33 000 65 000 196 000
Fire Vehicles EOD54 n a 40 000 40 000 40 000 120 000
Aerial Photography for City GIS Datasets EOD55 nla 32 000 43 000 44 500 119 500
Front End Loaders EOD56 n a 175 000 175 000
Skidloader Planer EOD61 nla 15 000 15 000
Light Duty Trucks Utilities EOD62 nla 54 000 70 000 55 000 179 000
Administration Vehicle EOD63 n a 25 000 25 000
Engineering Vehicles EOD65 nla 58 000 58 000
Storage Area Network EOD81 n a 45 000 20 800 20 800 20 800 107 400
CSO Truck EOD83 nla 30 000 30 000
Office EOD84 nla 5 000 5 000 5 000 5 000 5 000 25 000
Standby Generator City Hall EOD85 n a 130 000 130 000
Equipment for New Fire Station EOD86 n a 1 000 000 1 000 000
Major Equipment Total 849 100 686 600 1 531 600 876 700 463 500 4 407 500
IMunicipal Buildings I
Public Works Facility Improvements MB 003 n a 8 060 000 8 060 000
Siding and Backing Replacement MB 008 n a 20 000 20 000
Fire Station 3 MB 009 nla 2 000 000 2 000 000
City Hall Remodel MB 010 n a 125 000 125 000
Pioneer Cemetery Fencing and Landscaping MB 013 n a 10 000 10 000
City Hall North Parking Lot MB 014 n a 280 000 280 000
225
Department Project Priority 2008 2009 2010 2011 2012 Total
Mllllicipal Buildings Total 8 070 000 300 000 2 000 000 125 000 10 495 000
IPark Trail Im rovements I
Hwy 101 North Trail Connection PK T029 nla 114 000 114 000
Picnic Tables Park Benches PK T042 nla 6 000 6 000 6 000 6 000 6 000 30 000
Trees PK TD43 n a 5 000 5 000 5 000 5 000 5 000 25 000
Arboretum Business Park Lot 12 Trail PK To47 n a 317 000 317 000
Hwy 41 Pedestrian UnderpasslTrail Grant Match PK T069 n a 125 000 125 000
Tennis Court Repair PK T072 nla 50 000 50 000
Liberty at Creekside Trail PK TD75 n a 275 000 275 000
The Preserve Trail and Bridge PK T076 n a 250 000 250 000
Lakeside Trail Lyman Boulevard PK T077 n a 60 000 60 000
2005 MUSA Park Acquisition and Development PK T078 n a 400 000 400 000
Recreation Center fitness Equipment PK TD79 n a 10 000 10 000 10 000 10 000 10 000 50 000
Recreation Center Lobby Furniture PK T080 n a 18 800 18 800
Lyman Blvd Trail Improvements PK T081 n a 500 000 500 000
Carver Beach Park Fishing Dock Extension PK TD82 n a 3 000 3 000
Bluff Creek Drive Gap Trail PK TD83 n a 350 000 350 000
Pioneer Boulevard Gap Trail PK T084 nla 300 000 300 000
Disc Golf Course Contribution PK T085 nla 20 000 20 000
Lake Ann Park Ballfield Shelter Restrooms PK TD86 nla 750 000 750 000
Park TrailImprovements Total 669 800 1 285 000 216 000 n1 000 696 000 3 637 800
IPlanning
Update of Comprehensive Plan PL 001 n a 30 000 30 000
County Rd 61 old 212 Corridor Study PL 002 n a 75 000 75 000
PllllUling Total 30 000 75 000 105 000
ISanitary Sewer Improvements I
Inflow and Infiltration Abatement 55 012 nla 200 000 200 000 200 000 200 000 800 000
Sanitary Sewer Replacement 55 014 nla 250 000 250 000 500 000
Sanitary Lift Station Rehabilitation Program 55 017 n a 140 000 76 000 260 000 105 000 100 000 681 000
Dell Road77th Street Forcemain Replacement 55 018 n a 125 000 125 000
2010 MUSA Sanitary Lift Station 55 020 n a 2 200 000 2 200 000
Lift Station 3 Standby Generator 55 021 n a 80 000 80 000
SlIIIitlllY Sewer Improvements Total 670 000 401 000 2 910 000 305 000 100 000 4 386 000
IStreet Imfrovements I
West 78th St Streetlights 5T 001 nla 300 000 300 000
Lyman Boulevard Improvements 5T 003 n a 8 950 000 5 300 000 5 600 000 19 850 000
Annual Street Improvement Program 5T 012 nla 1 600 000 3 500 000 2 200 000 1 200 000 1 500 000 10 000 000
TH 101 Corridor Preservation Planning 5T 017 nla 200 000 300 000 500 000
Pavement Management 5T 0 18 n a 385 000 385 000 385 000 385 000 385 000 1 925 000
TH 5 Corridor Study TH 41 to TH 212 5T 019 n a 10 000 10 000
Downtown Decorative StreetlightsSignal Enhancemnt 5T 020 n a 35 000 35 000
Street Improvements Total 11 170 000 3 895 000 8 185 000 1 585 000 7 785 000 32 620 000
ISurface Water Management I
SWMP Implementation 5WMP 012 n a 350 000 300 000 300 000 300 000 300 000 1 550 000
226
Department Project Priority 2008 2009 2010 2011 2012 Total
Property Acquisition 5WMP 014 n a 250 000 100 000 200 000 200 000 100 000 850 000
Street Improvement Projects Storm Water Mgmt 5WMP 019 n a 400 000 300 000 400 000 1 100 000
Leaf Vacuum 5WMP 021 nla 40 000 40 000
Excavator 5WMP 022 nla 70 000 70 000
Vactor Used 5WMP 023 nla 200 000 200 000
Bluff Cr Nat Resources Mgmt Plan Implementation 5WMPD24 n a 150 000 150 000 150 000 150 000 150 000 750 000
Lake Minnewashta Outlet 5WMP 026 nla 30 000 30 000
Natural Resources Stewardship Plan 5WMP 027 n a 50 000 20 000 20 000 20 000 20 000 130 000
Landings Court Storm Water Pond Imp 5WMP 029 n a 70 000 70 000
Lake Susan Shoreline Restoration Improvements 5WMP 030 n a 90 000 90 000
West Lotus Lake Drainage Improvements 5WMP 031 n a 400 000 400 000 800 000
Surfaee Wtlter MlllUlgement Total 1 760 000 1 170 000 1 110 000 670 000 970 000 5 680 000
IWater System Improvements I
Repainting West 76th St Water Tower W 015 n a 80 000 80 000
Arboretum Water Main W 020 n a 220 000 220 000
Watermain Replacement W 024 nla 660 000 700 000 700 000 2 060 000
Well 4 Improvements W 025 nla 350 000 350 000
Pressure Reducing Station 8 W027 n a 65 000 150 000 215 000
Raw Well Water Collection System W030 nla 500 000 500 000
Well Rehabilitation Program W032 n a 80 000 40 000 45 000 45 000 45 000 255 000
West Water Treatment Plant W 037 n a 11 000 000 11 000 000
Stand by Generator for wells W 038 n a 120 000 120 000
Audubon South Watermain Loop W 039 n a 150 000 150 000
Repaint Melody Hills Water Tower W 040 n a 300 000 300 000
Repaint Lake Lucy Water Stand Pipe W 041 nla 550 000 550 000
High Zone Elevated Storage Tank W 042 n a 1 850 000 1 850 000
Well 14 Improvements W 043 n a 1 200 000 1 200 000
Well 13 W 044 n a 1 200 000 1 200 000
West Junior High School Well W045 n a 715 000 715 000
Low Zone 1 million gallon Elevated Storage Tank W046 n a 2 500 000 2500 000
Well 12 Improvements W047 n a 940 000 940 000
Wtiter System Improvements Total 3 930 000 no ooo 3 515 000 3 745 000 12 245 000 24 205 000
GRAND TOTAL 27 148 900 8 582 600 19 467 600 7 952 700 22 384 500 85 536 300
227
City of Chanhassen MN
Capital Improvement Program
2008 thru 2012
FUNDING SOURCE SUMMARY
Source 2008 2009 2010 2011 2012 Total
Arterial Collector Dvlpmnt Fee 250 000 1 000 000 1 250 000
Assessment Revolving Assess Fund 2 055 000 1 140 000 1 900 000 1 200 000 1 500 000 7 795 000
Cable TV Fund 10 000 10 000 10 000 10 000 10 000 50 000
Capital Replacement Fund 877 900 645 600 1 031 600 806 700 533 500 3 895 300
General Fund 30 000 75 000 105 000
GO Bonds 7 000 000 2 500 000 9 500 000
MSA 1 410 125 2 627 125 957 125 117 125 2 261 125 7372 625
Other Agency Contribution 5 846 000 340 000 2 960 000 3 506 000 12 652 000
Park Dedication Fund 1 141 000 1 275 000 556 000 761 000 686 000 4 419 000
Reforestation 50 000 20 000 20 000 20 000 20 000 130 000
Revenue Bonds 11 000 000 11 000 000
Sewer Utility Fund 1 420 000 455 000 2 960 000 375 000 155 000 5 365 000
Surface Water Utility Fund 2 631 000 950 000 1 540 000 650 000 1 200 000 6 971 000
Tax Levy 267 875 267 875 267 875 267 875 267 875 1 339 375
Water Utility Fund 4 160 000 777 000 3 765 000 3 745 000 1 245 000 13 692 000
GRAND TOTAL 27 148 900 8 582 600 19 467 600 7952 700 22 384500 85 538 300
228
City of Chanhassen MN
Capital Improvement Program
2008 thru 2012
PROJECTS BY FUNDING SOURCE
Source Pro ject Priority 2008 2009 2010 2011 2012 Total
IArterial Collector Dvlpmnt Fee I
Lyman Boulevard Improvements 5T 003 nla 250 000 1 000 000 1 250 000
Arterial Collector Dvlpmnt Fee Total 250 000 1 000 000 1 250 000
IAssessmentIRevolving Assess Fund I
City Hall North Parking Lot MB 014 nla 140 000 140 000
Lyman Boulevard Improvements 5T 003 n a 400 000 400 000
Annual Street Improvement Program 5T 012 nla 1 600 000 1 000 000 1 900 000 1 200 000 1 500 000 7200 000
Downtown Decorative Streetlights Signal Enhancemnt 5T 020 nla 35 000 35 000
Audubon South Watermain Loop W 039 nla 20 000 20 000
AssessmentRevolving Assess Fund Total 2 055 000 1 140 000 1 900 000 1 200 000 1 500 000 7795 000
ICable TV Fund
AudioNisual Equipment EOD26 n a 10 000 10 000 10 000 10 000 10 000 50 000
Cable TV Fund Total 10 000 10 000 10 000 10 000 10 000 50 000
ICapital Replacement Fund I
Fire Dept SCBA Equipment EOD04 n a 5 000 5 000 5 000 5 000 20 000
Laptop Computers EOD09 n a 50 000 50 000
PPE TurnoutHelmets EOo10 nla 15 000 15 000 15 000 15 000 60 000
Computer Network Equipment Purchases Upgrades EOD 13 n a 97 700 104 500 116 800 90 900 93 200 503 100
Telecommunication PurchaseslUpgrades EOD14 nla 6 200 50 000 20 000 6 000 6 000 88 200
Community Dev Light Duty Trucks EOD15 n a 54 000 30 000 28 000 29 000 141 000
Dump Plow Truck ReplacementsAdditions EOo16 n a 161 000 371 800 169 000 701 800
Vibratory Roll Packer EOD 19 nla 45 000 45 000
Equipment Trailers EOD21 nla 25 000 25 000
Tar Kettle EOD22 n a 30 000 30 000
Ford 555C Backhoe EOD23 nla 80 000 80 000
Line Striper EOD25 n a 9 000 9 000
Groundsmaster 580 Mower Replacement EOo28 n a 82 000 82 000
Light Duty Trucks Public Works EOo29 nla 32 000 32 000 64 000
Grounds Mower Replacement EOD34 n a 37 000 37 000
Mailing Folderllnserter EOo41 n a 20 000 20 000
Software Purchases EOo48 nla 30 500 42 000 37 000 22 000 22 000 153 500
Computerized Records Retention System EOD49 n a 12 700 31 300 8 000 9 000 61 000
Light Duty Trucks Parks EOD52 n a 98 000 33 000 65 000 196 000
Fire Vehicles EOD54 nla 40 000 40 000 40 000 120 000
Aerial Photography for City GIS Datasets EOD55 nla 32 000 43 000 44 500 119 500
Front End Loaders EOD56 n a 175 000 175 000
Skid loader Planer EOo61 n a 15 000 15 000
229
Source Pro iect Priority 2008 2009 2010 2011 2012 Total
Administration Vehicle EOo63 nla 25 000 25 000
Engineering Vehicles EOo65 n a 58 000 58 000
Storage Area Network EOo81 n a 45 000 20 800 20 800 20 800 107 400
CSO Truck EOo83 nla 30 000 30 000
Office EOo84 n a 5 000 5 000 5 000 5 000 5 000 25 000
Standby Generator City Hall EOo85 n a 130 000 130 000
Equipment for New Fire Station EOo86 nla 500 000 500 000
Siding and Backing Replacement MB 008 n a 20 000 20 000
City Hall Remodel MB O 10 n a 125 000 125 000
Pioneer Cemetery Fencing and Landscaping MB 013 nla 10 000 10 000
Recreation Center fitness Equipment PK T079 n a 10 000 10 000 10 000 10 000 10 000 50 000
Recreation Center Lobby Furniture PK T080 n a 18 800 18 800
Capital Replacement Fund Total an 900 645 600 1 031 600 a06 700 533 500 3 895 300
IGeneral Fund I
Update of Comprehensive Plan PL 001 n a 30 000 30 000
County Rd 61 old 212 Corridor Study PL 002 nla 75 000 75000
General Fund Total 30 000 75 000 105 000
IGO Bonds I
Equipment for New Fire Station EOo86 n a 500 000 500 000
Public Works Facility Improvements MB 003 n a 7 000 000 7 000 000
Fire Station 3 MB 009 n a 2 000 000 2 000 000
GO Bonds Total 7 000 000 2 500 000 9 500 000
IMSA I
West 78th St Streetlights 5T 001 nla 300 000 300 000
Lyman Boulevard Improvements 5T 003 nla 1 243 000 490 000 1 844 000 3 577 000
Annual Street Improvement Program 5T 012 n a 2 500 000 300 000 2 800 000
TH 101 Corridor Preservation Planning 5T 017 nla 50 000 50 000 100 000
Pavement Management 5T 0 18 nla 117 125 117 125 117 125 117 125 117 125 585 625
TH 5 Corridor Study TH 41 to TH 212 5T 019 n a 10 000 10 000
MSA Total 1 410 125 2 627 125 957 125 117 125 2 261 125 7372 625
IOther Agency Contribution I
City Hall North Parking Lot MB O 14 n a 140 000 140 000
Lyman Boulevard Improvements 5T 003 nla 5457 000 2 710 000 3 506 000 11 673 000
TH 101 Corridor Preservation Planning 5T 017 nla 150 000 250 000 400 000
Lake Susan Shoreline Restoration Improvements 5WMP 030 n a 39 000 39 000
West Lotus Lake Drainage Improvements 5WMP 031 nla 200 000 200 000 400 000
Other Agency Contribution Total 5 846 000 340 000 2 960 000 3 506 000 12 652 000
IPark Dedication Fund I
Hwy 101 North Trail Connection PK T029 n a 114 000 114 000
Picnic Tables Park Benches PK T042 n a 6 000 6 000 6 000 6 000 6 000 30 000
Trees PK T 043 n a 5 000 5 000 5 000 5 000 5 000 25 000
Arboretum Business Park Lot 12 Trail PK To47 n a 317 000 317 000
230
Source Pro i ect Priority 2008 2009 2010 2011 2012 Total
Hwy 41 Pedestrian UnderpasslTrail Grant Match PK T069 nla 125 000 125 000
Tennis Court Repair PK T072 n a 50 000 50 000
Liberty at Creekside Trail PK T075 nla 275 000 275 000
The Preserve Trail and Bridge PK T076 n a 250 000 250 000
Lakeside Trail Lyman Boulevard PK T077 n a 60 000 60 000
2005 MUSA Park Acquisition and Development PK T078 n a 400 000 400 000
Lyman Blvd Trail Improvements PK TD81 n a 500 000 500 000
Carver Beach Park Fishing Dock Extension PK T082 n a 3 000 3 000
Bluff Creek Drive Gap Trail PK T083 n a 350 000 350 000
Pioneer Boulevard Gap Trail PK T084 n a 300 000 300 000
Disc Golf Course Contribution PK T085 nla 20 000 20 000
Lake Ann Park Ballfield Shelter Restrooms PK T086 n a 750 000 750 000
Lyman Boulevard Improvements 5T 003 n a 500 000 350 000 850 000
Park Dedication Fund Total 1 141 000 1 275 000 556 000 761 000 686 000 4 419 000
I Reforestation I
Natural Resources Stewardship Plan 5WMP 027 nla 50 000 20 000 20 000 20 000 20 000 130 000
Reforestation Total 50 000 20 000 20 000 20 000 20 000 130 000
IRevenue Bonds I
West Water Treatment Plant W 037 n a 11 000 000 11 000 000
Revenue Bonds Total 11 000 000 11 000 000
ISewer Utility Fund I
Light Duty Trucks Utilities EOo62 n a 54 000 70 000 55 000 179 000
Public Works Facility Improvements MB 003 nla 700 000 700 000
Inflow and Infiltration Abatement 55 012 n a 200 000 200 000 200 000 200 000 800 000
Sanitary Sewer Replacement 55 014 nla 250 000 250 000 500 000
Sanitary Lift Station Rehabilitation Program 55 017 n a 140 000 76 000 260 000 105 000 100 000 681 000
Dell Road77th Street Forcemain Replacement 55 018 n a 125 000 125 000
2010 MUSA Sanitary Lift Station 55 020 nla 2 200 000 2200 000
Lift Station 3 Standby Generator 55 021 n a 80 000 80 000
Lyman Boulevard Improvements 5T 003 n a 50 000 50 000 100 000
Sewer Utility Fund Total 1 420 000 455 000 2 960 000 375 000 155 000 5 365 000
ISurface Water Utility Fund I
Public Works Facility Improvements MB 003 n a 360 000 360 000
Lyman Boulevard Improvements 5T 003 n a 800 000 450 000 250 000 1 500 000
SWMP Implementation 5WMP 012 n a 350 000 300 000 300 000 300 000 300 000 1 550 000
Property Acquisition 5WMP 014 n a 250 000 100 000 200 000 200 000 100 000 850 000
Street Improvement Projects Storm Water Mgmt 5WMP 019 n a 400 000 300 000 400 000 1 100 000
Leaf Vacuum 5WMP 021 n a 40 000 40 000
Excavator 5WMP 022 n a 70 000 70 000
Vactor Used 5WMP 023 n a 200 000 200 000
Bluff Cr Nat Resources Mgmt Plan Implementation 5WMP 024 n a 150 000 150 000 150 000 150 000 150 000 750 000
Lake Minnewashta Outlet 5WMP 026 n a 30 000 30 000
Landings Court Storm Water Pond Imp 5WMP 029 n a 70 000 70000
Lake Susan Shoreline Restoration Improvements 5WMP 030 n a 51 000 51 000
West Lotus Lake Drainage Improvements 5WMP 031 nla 200 000 200 000 400 000
231
232
Capital Improvement Program
City 0 Chanhassen MN
Project EQ 004
Project Name Fire Dept SCBA Equipment
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life 20 years
Category Fire
Priority n a
Total Project Cost 95 000
Account 1 400 4115 4705 Account 3
Account 2
Description I
This program is to provide additional SCBA bottles and upgrade air packs as needed
Justification I
SCBA packs will be 20 years old in 20 II Replacement will bring packs to new standards Bottles replaced in 2007 due to DOTINFP A expirationwillbetradedinorusedwithnewpacksifthesamebrandispurchased
Prior
I 75 000 I
rotal
Expenditures
Equipment
2008
5 000
5 000
2009
5 000
5 000
2010
5 000
5 000
2011
5 000
5 000
2012 Total
20 000
20 000Total
Prior
I 75 000 I
1 0 tal
Funding Sources
Capital Replacement Fund
Total
2008
5 000
5 000
2009
5 000
5 000
2010
5 000
5 000
2011
5 000
5 000
2012 Total
20 000
20 000
Operational ImpactOther I
This assists the department on emergency scenes and helps reduce on scene times by eliminating the need to shuttle bottles from the scene to the
fire station for re filling
233
Capital Improvement Program
City of Chanhassen MN
Project EQ 009
Project Name Laptop Computers
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life 7 10 years
Category Fire
Pdority n a
Total Project Cost 50 000
Account 1 400 4127 4703 Account 3
Account 2
Description I
Involves installing laptops in all front line vehicles to enable responding personnel to access building pre plans hazardous materials data hydrant
and other utility maps address locations etc
Justification I
The project will enhance Fire Department operations allowing for increased safety as a result of easy access to important information It will also
make it easier to find best routes and or alternative routes when responding to emergencies
Expenditures
Office Equipment
2008 2009 2010
50 000
50 000
2011 2012 Total
50 000
50 000Total
Funding Sources
Capital Replacement Fund
2008 2009 2010
50 000
50 000
2011 2012 Total
50 000
50 000Total
OperatiolUll ImpactOther I
There should be no operational impact from this purchase The current maintenance budget will accommodate for this addition
234
Capital Improvement Program 2008 thru 2012
Contact
City of Chanhassen MN Department Major Equipment
Project EQ OIO Type Unassigned
Useful Life 20 yearsProjectNamePPETurnoutHelmetsCategoryFire
Accou nt 1 400 4105 4705 Account 3 Priority n a
Account 2
Total Project Cost 75 000
Description I
Replacement of 3 5 sets per year as a result of damage received from firefighting activities The city will also provide new members with new gear
after they complete their probationary period
Justification I
i
Turnout gear lasts approximately 5 7 years on average
Prior Expenditures 2008 2009 2010 2011 2012 Total
I 15 000 I Maintenance 15 000 15 000 15 000 15 000 60 000
IohlI Total 15 000 15 000 15 000 15 000 60 000
Prior Funding Sources 2008 2009 2010 2011 2012 Total
I 15 000 I Capital Replacement Fund 15 000 15 000 15 000 15 000 60 000
rotal Total 15 000 15 000 15 000 15 000 60 000
Operational ImpactOther I
There should be no operational impact from this purchase The current maintenance budget will accommodate for this addition
235
Capital Improvement Program
City of Chanhassen MN
2008 thnl2012
Project EQ 013
Project NanlC ComputerNetwork Equipment PurchaseslUpgrades
Account 1 400 4126 4703 Account 3
Accou nt 2
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Administration
Priority n a
Total Project Cost 503 100
Description I
Funds the purchase of replacement user and network computers printers peripherals and networking hardware The replacement schedule was
adopted in 1999 and is subject to modifications by the MIS Coordinator with approval from the City Manager and department heads
Justification I
Budgeting and purchasing computer equipment through this project allows the city greater flexibility to direct equipment to where it is needed the
most rather than in individual budgets The replacement schedule was developed in 1999 by the MIS Coordinator and was approved by the 1999
council appointed IT task force Expenditures in the 2008 budget request are for the replacement of core and departmental switches 4 network
servers 4 workstations 8 desktop pes and one notebook PC Replaced equipment will be recycled if possible for use by other users or will be
sold on the city public surplus auction site
Expenditures
Office Equipment
2008
97 700
97 700
2009
104 500
104 500
2010
116 800
116 800
2011
90 900
90 900Total
Funding Sources
Capital Replacement Fund
Total
2008
97 700
97 700
2009
104 500
104 500
2010
116 800
116 800
2011
90 900
90 900
Operational ImpactOther I
2012
93 200
93 200
Total
503 100
503 100
2012
93 200
93 200
Total
503 100
503 100
236
Capital Improvement Program
City 0 Chanhassen MN
Project EQ O 14
Project NanlC Telecommunication PurchaseslUpgrades
2008 thru 2012
Account 1 400 4101 4703 Accou nt 3
Account 2
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life 5 7 years
Category Administration
Priority n a
Total Project Cost 88 200
Description I
This project funds the expansion and upgrades to the city telephone systems excluding cellular equipment which remains an individual department
budget item The current system is an Intertel Axxess PBX which serves City Hall Public Works the main fire tation the Recreation Center and
the Water Treatment Plant A new call accounting software package was added in 2007 The system is planned to be replaced in 2009 at which
time it will be 10 years old
Justification I
A central PBX system simplifies the management of phone services and for the integration with other city applications such as unified messaging
The city PBX server hardware and software will continue to be upgraded as necessary until its scheduled replacement in 2009 Two new facilities
a new Public Works building and a third Fire Station are projected to be constructed in 2009 1010 The new system would be sized to
accommodate additional services Any new phone equipment for the new buildings would be funded out of the construction projects A redundant
PBX switch is proposed for the year following the replacement of the Axxess system Only upgrades to individual telephones are proposed in
2008
Expenditures
Office Equipment
2008
6 200
6 200
2009
50 000
50 000
2010
20 000
20 000
2011
6 000
6 000Total
Funding Sources
Capital Replacement Fund
Total
2008
6 200
6 200
2009
50 000
50 000
2010
20 000
20 000
2011
6 000
6 000
2012
6 000
6 000
Total
88 200
88 200
2012
6 000
6 000
Total
88 200
88 200
Operational ImpactOther I
A new maintenance aggreement was established with Eschelon Telecom following the expiration of the 5 year warranty from InterteThe MIS
operating budget includes annual maintenance charges for this service
237
Capital Improvement Program
City o f Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Major Equipment
Account 1 400 4107 4704 Account 3
Type Vehicles
Useful Life Unassigned
Category Community Development
Priority n a
Project EQ 015
Project NanlC Community Dev Light Duty Trucks
Account 2
Total Project Cost 141 000
Description I
These purchases are consistent with the Vehicle Replacement Schedule Replacement units are generally purchased early in the year to
accommodate the time frames established by Hennepin County and the State of Minnesota Cooperative Purchasing Program
2008 605 1996 Ford Ranger Pickup
2008 606 1998 Ford Ranger Pickup
2009 801 1996 Chevrolet Astro Van
2010 606 1999 Ford Ranger Pickup
2012 603 2001 Ford Ranger Pickup
Justification I
These vehicles are used to provide building inspection services throughout the community The average replacement age is over 10 years
Expenditures
Vehicles
2008
54 000
54 000
2009
30 000
30 000
2010
28 000
28 000
2011 2012
29 000
29 000
Total
141 000
141 000Total
Funding Sources
Capital Replacement Fund
Total
2008
54 000
54 000
2009
30 000
30 000
2010
28 000
28 000
2011 2012
29 000
29 000
Total
141 000
141 000
Operational ImpactOther I
These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced
238
Capital Improvement Program
City o f Chanhassen MN
Project EQ 016
Project Name Dump Plow Truck Replacements Additions
2008 thru 2012
Account 1 400 4108 4704 Account 3
Account 2
Contact Unassigned
Department Major Equipment
Type Vehicles
Useful Life Unassigned
Category Street Equipment
Priority n a
Total Project Cost 701 800
Description I
These purchases are required to maintain a reliable truck fleet Costs include truck chassis dump box hydraulic system snow wing snow plow
and sander Truck chassis costs are higher due to new federal mandated anti lock braking requirements effective since 2000 These vehicles are
purchased using either the Hennepin County or State of MN cooperative bid systems Orders for truck chassis are typically required to be placed
up to one year in advance of del ivery
2008 117 1994 Ford L8000 Dump Truck
2010 118 1994 Ford L8000 Dump Truck
2011 115 1991 Ford F800 Dump Truck
201 116 1992 Ford L8000 Dump Truck
Justification I
These vehicles are used to provide a variety of maintenance services throughout the community including winter response for plowing and hauling
snow The average replacement age is 16 5 years Winter emergency service necessitates these vehicles be reliable and dependable Growth in the
community creates additional work for these trucks These vehicle purchases are consistent with the Vehicle Replacement Schedule
Expenditures
Vehicles
2008
161 000
161 000
2009 2010 2011
371 800
371 800Total
Funding Sources
Capital Replacement Fund
2008
161 000
161 000
2009 2010 2011
371 800
371 800Total
2012
169 000
169 000
Total
701 800
701 800
2012
169 000
169 000
Total
701 800
701 800
Operational ImpactOther I
These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced
239
Capital Improvement Program
City o f Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
Piority n a
Total Project Cost 45 000
Project EQ 019
Project NanlC Vibratory Roll Packer
Account 1 400 0000 4704 Account 3
Accou ot 2
Description I
Purchase is scheduled to replace the 1987 Rosco Vibratory Roll Packer The purchase is consistent with the Vehicle Replacement Schedule
2008 133 1987 Rosco Vibratory Roll Packer
Justification I
This machine is used extensively in the patching and overlaying of City streets The unit will be 21 years old at the time of replacement
Expenditures
Vehicles
2008 2009
45 000
45 000
2010 2011 2012 Total
45 000
45 000Total
Funding Sources
Capital Replacement Fund
Total
2008 2009
45 000
45 000
2010 2011 2012 Total
45 000
45 000
Operational ImpactOther I
This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the machine replaced
240
Capital Improvement Program
City o f Chanhassen MN
EQ 021
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
Priority n a
Total Project Cost 25 000
Project
Project Nanle Equipment Trailers
Account 1 400 0000 4705 Account 3
Account 2
Description I
Provides for replacement of an existing and the addition of a 20 000 lb 0 ton capacity tandem axle trailer
2008 138 Hi Ibros 20 000 Ib tandem axle trai ler
Justification I
These trailers are used extensively in the paving operation to transport the paver machine roll packer skidloader and other equipment to and from
the job sites The utility and parks departments also utilize this trailer for their work The existing trailer is 20 years old
Expenditures
Equipment
2008
25 000
25 000
2009 2010 2011 2012 Total
25 000
25 000Total
Funding Sources
Capital Replacement Fund
Total
2008
25 000
25 000
2009 2010 2011 2012 Total
25 000
25 000
Operational ImpactOther I
80th purchases include a limited warranty
241
Capita Improvement Program 2008 thru 2012
Contact Unassigned
City o f Chanhassen MN Department Major Equipment
Project EQ 022 Type Equipment
Useful Life UnassignedProjectNameTarKettle
Category Street Equipment
Account 1 400 0000 4705 Account 3 Priority n a
Accou nt 2
Total Project Cost 30 000
Description I
Provides for replacement of the existing tar kettle
2008 134 1997 Stepp SBF 300 Tar Kettle
Justification I
The existing tar kettle is used extensively in the pavement maintenance operations Due to the nature of its use the life expectancy of this unit is
limited The kettle was purchased in 1997 and will be 11 years old at the time of trade in
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 30 000 30 000
Total 30 000 30 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 30 000 30 000
Total 30 000 30 000
Operational ImpactOther I
This purchase will include a limited warranty and will eliminate an expensive overhaul on the existing unit
I
I
242
Capital Improvement Program
City o f Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Major Equipment
Account 1 400 4111 4705 Account 3
Type Equipment
Useful Life Unassigned
Category Street Equipment
Pdority n a
Project EQ 023
Project Name Ford 555C Backhoe
AccouI1t 2
Total Project Cost 80 000
Description I
Provides for the replacement of an eXlsting 1989 Tractor Backhoe
2009 143 1989 Ford 555C Backhoe
Justification I
The tractor backhoe is used extensively in malntenance operations The backhoe is sometimes used by the Utility Department for waterrnain
breaks and uti lity replacement projects The Parks Department also uses the backhoe for their projects This purchase is consistent with the
Equipment Replacement Schedule
Expenditures
Equipment
2008 2009
80 000
80 000
2010 2011 2012 Total
80 000
80 000Total
Funding Sources
Capital Replacement Fund
2008 2009
80 000
80 000
2010 2011 2012 Total
80 000
80 000Total
Operational ImpactOther I
This purchase will1nclude a I1mited warranty and wlll reduce the annual maintenance and repair costs as compared to the machine replaced
243
Capital Improvement Program 2008 thru 2012
UnassignedContact
City o f Chanhassen MN Department Major Equipment
Project EQ 025 Type Equipment
Useful Life UnassignedProjectNameLineStriperCategoryStreetEquipment
Account 1 400 0000 4705 Account 3 Priority n a
Account 2
Total Project Cost 9 000
Description I
Provides for the replacement of an existing line striping machine
2010 NA 1994 Graco GM5000 Line Striper 5 hp
Justification I
This machine is used to paint pavement markings and stripe lanes on roads This purchase will ensure timely and reliable pavement marking
operations The purchase is consistent with the Equipment Replacement Schedule
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 9 000 9 000
Total 9 000 9 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 9 000 9 000
Total 9 000 9 000
Operational ImpactOther I
This purchase will include a limited warranty
244
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City o f Chanhassen MN Department Major Equipment
Project EQ 026 Type Equipment
Useful Life Unassigned
Project Name AudioNisual Equipment Category Administration
Accou nt 1 210 0000 4705 Account 3 Priority n a
Account 2
Total Project Cost 50 000
Description I
Provides for the systematic maintenance and upgrading of audio visual equipment
Justification I
The original A V equipment was purchased in 1989 with the upgrades in 1994
Expenditures 2008 2009 2010 2011 2012 Total
Maintenance 1 0 000 10 I 000 10 000 10 000 10 000 50 000
Total 10 000 10 000 10 000 10 000 10 000 50 000
Funding Sources 2008 2009 2010 2011 2012 Total
Cable TV Fund 10 000 10 000 10 000 10 000 10 000 50 000
Total 10 000 10 000 10 000 10 000 10 000 50 000
Operational ImpactOther I
This purchase will include a limited warranty In 2007 a major remodeling including camreas display screens AlV control systems and Ch 8
management was undertaken Future upgrades include expanding access to programming to those without access to cable and continued
enhancement of the live and broadcast experience
245
Capital Improvement Program
City of Chanhassen MN
Project EQ 028
Project Name Groundsmaster 580 Mower Replacement
2008 thru 2012
Contact Unassigned
DepartJnent Major Equipment
Type Equipment
Useful Life Unassigned
Category Park
Priority n a
Total Project Cost 82 000
Account 1 400 0000 4705 Account 3
Account 2
Description I
Provides for the replacement of an existing Toro 580 15 foot high volume grounds mower
Justification I
The City currently has 3 high production grounds mowers that cut a 15 pass Each machine is used daily during the growing season and takes the
place of 2 1 2 smaller machines used by the City Due to additional park development an additional high capacity machine is needed
Expenditures
Equipment
2008 2009
82 000
82 000
2010 2011 2012 Total
82 000
82 000Total
Funding Sources
Capital Replacement Fund
Total
2008 2009
82 000
82 000
2010 2011 2012 Total
82 000
82 000
Operational ImpactOther I
This purchase will include a limited warranty and reduce maintenance and repair expenses as compared to the unit replaced Also each of these
machines takes the place of 2 1 2 smaller machines and makes the mowing operation 150 more efficient
246
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Vehicles
Useful Life Unassigned
Category Street Equipment
Priority n a
Total Project Cost 64 000
Project EQ 029
Project Name Light Duty Trucks Public Works
Account 1 400 4120 4704 Account 3
Accou nt 2
Description I
Provides for scheduled replacement of light duty trucks in the street and garage departments Replacement units are generally purchased early in
the year in order to accommodate the time frames established by Hennepin County and the State ofMN Cooperative Purchasing Program
2009 109 1995 Chevrolet 3 4 ton 4x4
2010 110 1996 Chevrolet 3 4 ton 4x4
Justification I
These vehicles are used for a variety of services throughout the community The average replacement age is 13 years These purchases are
consistent with the Vehicle Replacement Program
Expenditures
Vehicles
2008 2009
32 000
32 000
2010 2011
32 000
32 000
2012 Total
64 000
64 000Total
Funding Sources
Capital Replacement Fund
Total
2008 2009
32 000
32 000
2010 2011
32 000
32 000
2012 Total
64 000
64 000
Operational ImpactOther I
These purchases will include a limited warranty and will reduce annual maintenance and repair costs as compared to the vehicles replaced
247
Capital Improvement Program 2008 thru 2012
UnassignedContact
City of Chanhassen MN DepartJnent Major Equipment
Project EQ 031 Type Improvement
Useful Life 10 15 yearsProjectNameSewerBobcatSnowAccessories
Category Utilities
Account 1 700 0000 4705 Accou nt 3 P iority n a
Account 2 701 0000 4705
Total Project Cost 7 000
Description I
The snowblower attachment is nearing its useful life and needs replacement
2009 NA 2007 Loftness Snow Blower
Justification I
This equipment is necessary for cleaning snow from water and sewer locations
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 7 000 7 000
Total 7 000 7 000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 7 000 7 000
Total 7 000 7 000
Operational ImpactOther I
248
Capital Improvement Program
City 0 Chanhassen MN
Project EQ 034
Project Name Grounds Mower Replacement
2008 thru 2012
Contact Unassigned
Department Major Equipment
Account 1 400 0000 4705 Accou nt 3
Type Equipment
Useful Life Unassigned
Category Park
Pdority n a
Account 2
Total Project Cost 37 000
Description I
Provides for replacement of lawn mowers
Justification I
With the amount of parkland consistently growing there is increased wear and tear on the Citys lawn mowers They are 12 16 years old and are
not dependable Rebuilding is not cost effective This is consistent with the Equipment Replacement Program
Expenditures
Equipment
2008
37 000
37 000
2009 2010 2011 2012 Total
37 000
37 000Total
Funding Sources
Capital Replacement Fund
Total
2008
37 000
37 000
2009 2010 2011 2012 Total
37 000
37 000
Operational ImpactOther I
This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the existing unit
249
Capital Improvement Program
City o f Chanhassen MN
Project EQ 041
Project Name Mailing Folder Inserter
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Administration
Priority n aAccount140041144703Account3
Account 2
Total Project Cost 20 000
lescription I
This is a replacement for the existing FolderInserter in the Administration Department It is used for folding and mailing all city wide and smaller
bulk mailings It will be used more after the utility bill format is changed
Justification I
We are leasing the current machine with no option to purchase The cost is higher than the cost to lease a new machine with a purchase option for
a doliar at the end of the I ease at a fi nanci ng rate of 1800 It makes more economic sense for us to purchase the machine at the city s cost of capital
of 6 and finance it over four or five years through the issuance of equipment certificates
Expenditures
Office Equipment
2008 2009 2010
20 000
20 000
2011 2012 Total
20 000
20 000Total
Funding Sources
Capital Replacement Fund
Total
2008 2009 2010
20 000
20 000
2011 2012 Total
20 000
20 000
Operational ImpactOther I
250
Capital Improvement Program
City o f Chanhassen MN
EQ 048
2008 thru 2012
Contact Unassigned
Department Major Equipment
Account 1 400 4117 4707 AccouIlt 3
Type Equipment
Useful Life 5 7 years
Category Administration
P iority n a
Project
Project Name Software Purchases
Accou nt 2
Total Project Cost 153 500
Description I
This project funds the purchase of new software for alJ city departments that is not associated with a specific individual project Annual support
and license fees for existing software applications are funded out of account 1160 4300
Justification I
The major portion of funds requested for this project are for Microsoft software purchases In 2007 the city joined the Microsoft Office Enterprise
Aggreement for the State of Minnesota Microsoft Office is the standard desktop software application for all city users Participating in the state
aggreement al lows the city to spread the cost of the product over a period of six years in which there are no additional fees for product upgrades
An add on module for the city s Springbook Software is proposed in 2008 to allow residents to check on their utility accounts and make electonic
payments Other software purchase requests in 2008 are for client access licenses for the new version of Windows server and for a mobile security
product for desktop pes
Expenditures
Office Equipment
2008
30 500
30 500
2009
42 000
42 000
2010
37 000
37 000
2011
22 000
22 000
2012
22 000
22 000
Total
153 500
153 500Total
Funding Sources
Capital Replacement Fund
Total
2008
30 500
30 500
2009
42 000
42 000
2010
37 000
37 000
2011
22 000
22 000
2012
22 000
22 000
Total
153 500
153 500
Operational ImpactOther I
251
Capital Improvement Program
City 0 Chanhassen MN
Project EQ 049
Project Name Computerized Records Retention System
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Administration
P iority n a
Total Project Cost 61 000
Account 1 400 4124 4703 Accou nt 3
Account 2
Description I
This project originally funded the purchase of an electronic records retention system The project is now used to fund its expansion and the
replacement of scanning equipment which has a useful life expectancy of 3 to 5 years A large format color copier scanner printer is proposed to
replace the Ricoh 240W in 2009
Justification I
This system allows for quick and sinlultaneous retrieval of documents from any computer on the city network Both physical document storage
space and the occurrence of lost or misfiled documents will be significantly reduced In addition documents specified for public access can be
easily made available to residents and constituents from any internet capable computer Web Access a web based full scanning client engine is
proposed for 2008 This would replace the full clients which require a local client to be loaded on the end user workstation This would become
the standard user interface for both staff and public access This client will greatly enhance our ability to integrate documents in Laserfiche to
other application software It is anticipated that this will replace the Weblink product in use for staff and public read only access
Expenditures
Office Equipment
2008
12 700
12 700
2009
31 300
31 300
2010
8 000
8 000
2011
9 000
9 000
2012 Total
61 000
61 000Total
Funding Sources
Capital Replacement Fund
Total
2008
12 700
12 700
2009
31 300
31 300
2010
8 000
8 000
2011
9 000
9 000
2012 Total
61 000
61 000
Operational ImpacVOther I
There is an annual license fee of 1 600 for the Laserfiche Web Access server which would be funded from the 116 4300 account
252
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City 0 Chanhassen MN Department Major Equipment
EQ 052 Type Vehicles
Project Useful Life Unassigned
Project N l Ole Light Duty Trucks Parks Category Park
Account 1 400 0000 4704 Account 3 Priority n a
Account 2
Total Project Cost 196 000
Description I
Provides for scheduled replacement of light duty trucks in the Park Maintenance Department
Justification I
These vehicles are used for multiple park maintenancer operations including towing mowers bobcat snowplowing sanding etc The average
replacement age of these vehicles is 13 5 yrs
Expenditures 2008 2009 2010 2011 2012 Total
Vehicles 98 000 33 000 65 000 196 000
Total 98 000 33 000 65 000 196 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 98 000 33 000 65 000 196 000
Total 98 000 33 000 65 000 196 000
Operational ImpactOther I
253
Capital Improvement Program
City o f Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Vehicles
Useful Life 10 1 5 years
Category Fire
Priority n a
Total Project Cost 205 000
Project EQ 054
Project Name Fire Vehicles
Account 1 400 4135 4704 Accou nt 3
Account 2
Description I
This item allows for the replacement of existing equipment Vehicles are purchased off either the Hennepin County or State of Minnesota
cooperative bid Orders are typically required to be placed up to one 1 year in advance of delivery
Justification I
As vehicles age they become less reliable Also they require more costly maintenance Vehicles proposed for replacement are
Unit 219 1988 chev 1 ton 2007 85 000
Unit 703 1999 Explorer 2008 40 000
Unit 207 1995 Astro Van 2009 40 000
Unit 706 1997 Expedition 2010 40 000
Prior
f 85 000 I
rot ll
Expenditures
Vehicles
2008
40 000
40 000
2009
40 000
40 000
2010
40 000
40 000
2011 2012 Total
120 000
120 000Total
Prior
I 85 000 I
1 0 tnl
Funding Sources
Capital Replacement Fund
Total
2008
40 000
40 000
2009
40 000
40 000
2010
40 000
40 000
2011 2012 Total
120 000
120 000
Operational ImpactOther I
These purchases wil1 include a limited warranty and wil1 reduce the annual maintenance and repair costs The electrical work on the Aerial Truck
will correct an existing problem that has been a concern of the mechanics for some time
254
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Account 1 400 0000 4752 Account 3
Contact Unassigned
DepartJnent Major Equipment
Type Improve men t
Useful Life 5 7 years
Category Administration
Priority n a
Total Project Cost 119 500
Project EQ 055
Project Name Aerial Photography for City GIS Datasets
Accou nt 2
Description I
This project funds the aerial photography for the integration with the city s existing GIS datasets This project is dependent upon the cooperation
of the Carver County GIS department This initial joint aerial flyover was conducted in April of 2005 and is scheduled to be re flown every three
years In 2008 the County will be purchasing an enterprise license for Pictometry a mapping product which provides three dimensional and
orthographic views along with a full featured mapping client By participating in the project the city will have unlimited access to the client and
dataset Additional funds are being requested to assist with integrating the client to other existing city applications such as Laserfiche
Justification I
City Planners Engineers and Util ity staff use this data in conjunction with other GIS datasets to help resolve geographical issues with residents
and contractors without repeated site visits It is used in nearly every scheduled staff meeting and has proven useful to the Sheriffs Office and fire
department when conducting area searches The Pictometry solution will also provide the ability for staff to view each side of buildings and
includes a toolset which allows for the accurate measurement of areas and lines
Expenditures
Maintenance
2008
32 000
32 000
2009 2010
43 000
43 000
2011 2012
44 500
44 500
Total
119 500
119 500Total
Funding Sources
Capital Replacement Fund
Total
2008
32 000
32 000
2009 2010
43 000
43 000
2011 2012
44 500
44 500
Total
119 500
119 500
Operational ImpactOther I
255
Capital Improvement Program
City o f Chanhassen MN
ProJect EQ 056
Project Name Front End Loaders
2008 thru 2012
Accou nt 1 400 0000 4705 Account 3
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
Priority n a
Total Project Cost 175 000
Accou nt 2
Description I
This item replaces the front end loaders used in street maintenance This loader is used very frequently at the shop The loader was purchased in
1971 and wi J be 36 years old at the time of trade in The loader is also used for plowing residential streets
2010 132 1971 920 Cat Loader
Justification I
The loader requires more frequent and expensive repairs Replacement parts are hard to find
Expenditures
Equipment
2008 2009 2010 2011
175 000
175 000
2012 Total
175 000
175 000Total
Funding Sources
Capital Replacement Fund
Total
2008 2009 2010 2011
175 000
175 000
2012 Total
175 000
175 000
Operational ImpactOther I
256
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City of Chanhassen MN Department Major Equipment
ProJect EQ 061 Type Equipment
Useful Life UnassignedProjectNameSkidloaderPlanerCategoryStreetEquipment
Account 1 400 0000 4705 Account 3 Priority n a
Accou nt 2
Total Project Cost 15 000
Description I
This bobcat attachment is to be used for grinding out distressed pavement areas for patching This attachment is used extensively during the
summer to remove distressed pavement areas for patching
2008 NA 1996 Bobcat planer mill
Justification I
This is necessary for effective pavement patching
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 15 000 15 000
Total 15 000 15 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 15 000 15 000
Total 15 000 15 000
Operational ImpactOther I
257
Capital Improvement Program 2008 thru 2012
UnassignedContact
City 0 Chanhassen MN Department Major Equipment
Proect EQ 062 Type Vehicles
Useful Life UnassignedProjectNameLightDutyTrucksUtilitiesCategoryUtitHies
Account 1 700 0000 4704 2007 Accou nt 3 701 0000 4704 2011 Priority n a
Account 2 701 0000 4704 2009
Total Project Cost 179 000
Description I
This allows for replacement of existing vehicles in the Water and Sewer department
2009 3 19 1999 Dodge 3 4 ton 4x4
2009 309 1973 Ford P500 Watermain break van
2011 302 1999 Ford F 450 3 4 ton pickup
2012 317 1997 Chevrolet 3 4 ton pickup
Justification I
This replaces pickups in accordance with the vehicle replacement plan
Expenditures 2008 2009 2010 2011 2012 Total
Vehicles 54 000 70 000 55 000 179 000
Total 54 000 70 000 55 000 179 000
Funding Sources 2008 2009 2010 2011 2012 Total
Sewer Utility Fund 54 000 70 000 55 000 179 000
Total 54 000 70 000 55 000 179 000
Operational ImpactOther I
258
Capital Improvement Program 2008 thru 2012
UnassignedContact
City 0 Chanhassen MN Department Major Equipment
EQ 063 Type VehiclesProjectUsefulLifeUnassigned
Project Name Administration Vehicle Category Administration
Accou nt 1 400 0000 4704 Account 3 Priority n a
Account 2
Total Project Cost 25 000
Description I
This allows for replacement of an existing vehicle for City Hall
2010 2 1993 Ford Taurus
Justification I
This replaces a vehicle in accordance with the vehicle replacement plan
Expenditures 2008 2009 2010 2011 2012 Total
Vehicles 25 000 25 000
Total 25 000 25 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 25 000 25 000
Total 25 000 25 000
Operational ImpactOther I
259
Capital Improvement Program 2008 thru 2012
UnassignedContact
City o f Chanhassen MN DepartJnent Major Equipment
EQ 065 Type Vehicles
Project Useful Life Unassigned
Project N anlC Engineering Vehicles Street EquipmentCategory
Accou nt 1 400 0000 4704 Accou nt 3 Priority n a
Accou nt 2
Total Project Cost 58 000
Description I
The engineering van was purchased in 1995 and is used for engineering fieldwork and job site inspections
The Crown Victoria was purchased in 1993 and is used for general transportation for City Hall employees and site inspections
Justification I
These replacements are in accordance with the vehicle replacement plan
Expenditures 2008 2009 2010 2011 2012 Total
Vehicles 58 000 58 000
Total 58 000 58 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 58 000 58 000
Total 58 000 58 000
Operational ImpactOther I
260
Capital Improvement Program
City 0 Chanhassen MN
Project EQ 081
Project Name Storage Area Network
2008 thru 2012
Contact
Department Major Equipment
Account 1 400 4126 4703 Accou nt 3
Type Improvement
Useful Life 5 7 years
Category Administration
Priority n a
Account 2
Total Project Cost 107 400
Description I
This project funds the purchase of a storage area network SAN which will gradually replace all internal disk drives in existing network servers
The storage area network is a central storage device made up of individual storage modules and managed from a single console The SAN allows
disk storage to be modified as storage needs change without any downtime for city users
Justification I
The need for digital storage space for city documentation and applications is growing at a rate of 50GB to 100GB per year Existing storage space
is becoming difficult to manage on individual network servers Internal storage utilization is inefficient and requires system downtime to
reconfigure SAN storage allows for real time reconfiguation as well as the ability to make real time copies for redundancy and for daytime backup
processes The initial San installation would reside in the server room at city hall Additional storage units would be added in later years at other
city buildings to facilitate disaster recovery A 1 8 Terabyte redundant SAN is proposed to be implemented in year one with a second single unit
added in years 2 and 3 As each unit is added the overall performance of the SAN as a whole is greatly increased
Expenditures
Equipment
2008
45 000
45 000
2009
20 800
20 800
2010
20 800
20 800
2011 2012
20 800
20 800
Total
1 07400
107 400Total
Funding Sources
Capital Replacement Fund
Total
2008
45 000
45 000
2009
20 800
20 800
2010
20 800
20 800
2011 2012
20 800
20 800
Total
107400
107 400
Operational ImpactOther I
Software support is included for the first year Software support for the following years would be funded out of 116 4300 The hardware proposed
is covered under a three year next day warranty Hardware repairs would be done by MIS staff using a spare kit and replenished by the warranty
Spare parts required after the warranty expiration would be funded out of 116 4530
261
Capital Improvement Program 2008 thru 2012
Contact
City of Chanhassen MN Department Major Equipment
EQ 083 Type V chicles
Project
Useful Life
Project Name CSO Truck Category Administration
Accou nt 1 400 4l29 4 704 Account 3 Priority n a
Accou I1t 2
Total Project Cost 30 000
Description I
This allows for replacement of an existing CSO truck
Justification I
This replaces a vehicle in accordance with the vehicle replacement plan
Expenditures 2008 2009 2010 2011 2012 Total
Vehicles 30 000 30 000
Total 30 000 30 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 30 000 30 000
Total 30 000 30 000
Operational ImpactOther I
262
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN Department Major Equipment
I Project EQ 084 I Type Unassigned
Useful Life
Project NanlC Office Category Administration
Accou nt 1 Account 3 Priority n a
Account 2 Total Project Cost 25 000
Description I
Provide for office furniture and chair replacements
Justification I
This item will allow items to be replaced as they wear outor needs change
Expenditures 2008 2009 2010 2011 2012 Total
Office Equipment 5 000 5 000 5 000 5 000 5 000 25 000
Total 5 000 5 000 5 000 5 000 5 000 25 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 5 000 5 000 5 000 5 000 5 000 25 000
Total 5 000 5 000 5 000 5 000 5 000 25 000
Operational ImpactOther I
263
Capital Improvement Program
City 0 Chanhassen MN
Project EQ 085
Project NanlC Standby Generator City Hall
2008 thru 2012
Contact
Department Major Equipment
Account 1 Accou nt 3
Type Equipment
Useful Life 7 10 years
Category Administration
Priority n a
Account 2
Total Project Cost 130 000
Description I
This project funds the purchase of a standby generator for powering all of city Hall in emergency situations
Justification I
The current 5Kw standby generator which supplied power to the telephone system and the network server room is no longer functional Due to
both upgrades to the telephone system and network hardware it did not have the capacity to fully power these systems in full when functional A
150K w standby generator is being requested in order to supply power to all of City Hall in emergency situations City Hall has been designated as
the Emergency Operation Center for emergency events Standby power is neccessary to ensure this can be maintained in the event that outside
power is not available
Expenditures
Equipment
2008
130 000
130 000
2009 2010 2011 2012 Total
130 000
130 000Total
Funding Sources
Capital Replacement Fund
Total
2008
130 000
130 000
2009 2010 2011 2012 Total
130 000
130 000
OperationoJ ImpactOther I
Annual maintenance to be done by city utility shop staff
264
Capita Improvement Program 2008 thru 2012
Contact
City o f Chanhassen MN Department Major Equipment
Project EQ 086 Type Unassigned
Useful Life
Project N lnlC Equipment for New Fire Station Category Fire
Account 1 Accou nt 3 Priority n a
Account 2
Total Project Cost 1 000 000
Description I
Equipment for new satellite fire station to be built in 2010
Justification I
Response time from the other two stations will be unacceptable after Highway 212 is completed
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 1 000 000 1 000 000
Total 1 000 000 1 000 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 500 000 500 000
GO Bonds 500 000 500 000
Total 1 000 000 1 000 000
Operational ImpactOther I
265
Capital Improvement Program
City 0 Chanhossen MN
2008 thru 2012
Contact Unassigned
Department Municipal Buildings
Account t
Account 2
Account 3
Type Improvement
Useful Life Unassigned
Category Street Equipment
Priority n a
Project MB 003
Project Name Public Works Facility Improvements
Total Project Cost 8 060 000
Description I
The existing Public Works facility is over capacity and is in need of major repairs The City is expected to grow an additional 30 before ultimate
build out The existing facility is located on a 5 acre site which is already cramped for storage and operation space The City completed a facility
needs study that recommended moving the Public Works building because the existing site is too small for expansion
Justification I
The Operations and Maintenance Department needs additional space for repairs meeting facilities files storage supervisory offices and proper
equipment storage In addition the current facility does not meet many City building codes
Expenditures
Planning Design
2008
8 060 000
8 060 000
2009 2010 2011 2012 Total
8 060 000
8 060 000Totlll
Funding Sources 2008 2009 2010 2011 2012 Total
GO Bonds 7 000 000 7 000 000
Sewer Utility Fund 700 000 700 000
Surface Water Utility Fund 360 000 360 000
Totlll 8 060 000 8 060 000
Operatio1llllImpIICtOther I
This project would increase operational costs based on the percentage of the footprint expansion
266
Capital Improvement Program
City o f Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Municipal Buildings
Account 1 400 4003 4702 Account 3
Type Improvement
Useful Life 20 years
Category Fire
Priority n a
Project MB 008
Project Name Siding and Backing Replacement
Account 2
Total Project Cost 20 000
Description I
This project would be to replace the epoxy sealant on the bay floors at Station 2
Justification I
The West satellite station was originally built in 1980 Siding and roofing will be 30 years old The current siding is original It has some holes in
it and had some rotten spots replaced Currently we have a problem with bug infestation Replacement would also bring it up to the current code
Expenditures
Maintenance
2008 2009
20 000
20 000
2010 2011 2012 Total
20 000
20 000Total
Funding Sources
Capital Replacement Fund
Total
2008 2009
20 000
20 000
2010 2011 2012 Total
20 000
20 000
Operational ImpactOther I
There should be no operational impact to this project
267
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City 0 Chanhassen MN Department Municipal Buildings
Project MB 009
Type Improvemen t
Useful Life 20 years
Project NanlC Fire Station 3 Category Fire
Account 1 400 4143 Accou I1t 3 Priority n a
Account 2 Total Project Cost 2 000 000
Description I
This is for a possible fire station in the southern part of the city which will be developed after 2005
Justification I
Response time from the other two stations will be unacceptable after Highway 212 is completed
Expenditures 2008 2009 2010 2011 2012 Total
Construction 2 000 000 2 000 000
Total 2 000 000 2 000 000
Funding Sources 2008 2009 2010 2011 2012 Total
GO Bonds 2 000 000 2 000 000
Total 2 000 000 2 000 000
Operational ImpactOther I
The operational impact will be for the staffing and maintenance of personnel and equipment for the station once in place
268
Capital Improvement Program 2008 thru 2012
Contact
City of Chanhassen MN Department Municipal Buildings
Project MB O 10
Type Improvement
Useful Life
Project NanlC City Hall Remodel Category Administration
Account 1 Accou I1t 3 Priority n a
Account 2 Total Project Cost 125 000
Description I
Remodel and refurbish areas of City Hall that need paint carpet or storage areas added
Justification I
Certain areas of City Hall wi II be in need of some small repair and maintenance needs in 2010
Expenditures 2008 2009 2010 2011 2012 Total
Maintenance 125 000 125 000
Total 125 000 125 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 125 000 125 000
Total 125 000 125 000
Operational ImpactOther I
269
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN Department Municipal Buildings
Project MB O 13
Type Improvement
Useful Life
Project NanlC Pioneer Cemetery Fencing and Landscaping Category Administration
Account 1 Account 3 Priority n a
Accou ot 2 Total Project Cost 10 000
Description I
Construction of fencing and landscaping for the Pioneer Cemetery
Justification I
Expenditures 2008 2009 2010 2011 2012 Total
Construction 10 000 10 000
Total 10 000 10 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 10 000 10 000
Total 10 000 10 000
Operational ImpactOther I
270
Capital Improvement Program
City of Chanhassen MN
Project MB 014
Project Name City Hall North Parking Lot
2008 thru 2012
Contact
Department Municipal Buildings
Account 1 Account 3
Account 2
Type Improvement
Useful Life
Category StreetsHighways
Priority nla
Total Project Cost 280 000
Expenditures
Construction
2008 2009
280 000
280 000
2010 2011 2012 Total
280 000
280 000Total
Funding Sources
AssessmenVRevolving Assess
Other Agency Contribution
Total
2008 2009
140 000
140 000
280 000
2010 2011 2012 Total
140 000
140 000
280 000
271
Capital Improvement Program 2008 thru 2012
Contact
City o fChanhassen MN Department Park Trail Improvements
Projcct PK T 029 Type Improvement
Useful Life 30 Years
Project N anlC Hwy 101 North Trail Connection ParkCategory
Accou nt 1 410 0000 4710 Account 3 Priority n a
Accou nt 2 114 000TotalProjectCost
Description I
Construction of a 1 O foot wide pedestrian trail along the west side of Highway 101 from Pleasant View Road to Townline Road
Justification I
The last segment of a trai I that was originaly constructed in 2001
Expenditures 2008 2009 2010 2011 2012 Total
Construction 114 000 114 000
Total 114 000 114 000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 114 000 114 000
Total 114 000 114 000
Operational ImpactOther I
Overlay every 10 12 years
272
Capital Improvement Program 2008 thru 2012 UnassignedContact
City o f Chanhassen MN Department Park Trail Improvements
Project PK T 042
Type Improvement
Useful Life 10 15 years
Project Name Picnic Tables Park Benches Category Park
Account 1 410 000 4705 Accou nt 3 Priority n a
I
Account 2 Total Project Cost 60 000
Description I
Purchase of picnic tables and park benches
Justification I
New tables and benches are needed to replace old stock and meet new needs
Expenditures 2008 2009 2010 2011 2012 Total Future
Equipment 6 000 6 000 6 000 6 000 6 000 30 000 1 30 000 I
Total 6 000 6 000 6 000 6 000 6 000 30 000 l ohll
Funding Sources 2008 2009 2010 2011 2012 Total Future
Park Dedication Fund 6 000 6 000 6 000 6 000 6 000 30 000 I 30 000 I
Total 6 000 6 000 6 000 6 000 6 000 30 000 l otal
Operational ImpactOther I
273
Capital Improvement Program 2008 thru 2012 Contact Unassigned
City o f Chanhassen MN Department Park Trail Improvements
Project PK T 043
Type Improvement
Useful Life 50 Years
Project NanlC Trees Category Park
Accou nt 1 410 0000 4701 Account 3 Priority n a
Account 2 Total Project Cost 50 000
Description I
Annual tree planting program
Justification I
Planting trees is one of the best investments we can make in our future
Expenditures 2008 2009 2010 2011 2012 Total Future
Land Improvement 5 000 5 000 5 000 5 000 5 000 25 000 I 25 000 I
Total 5 000 5 000 5 000 5 000 5 000 25 000 Totul
Funding Sources 2008 2009 2010 2011 2012 Total I luture
Park Dedication Fund 5 000 5 000 5 000 5 000 5 000 25 000 I 25 000 I
Total 5 000 5 000 5 000 5 000 5 000 25 000 l otal
Operational ImpactOther I
274
Capital Improvement Program 2008 thru 2012 UnassignedContact
City 0 Chanhassen MN Department Park Trail Improvements
Project PK T 047 Type Improvement
Useful Life 30 Years
Project Name Arboretum Business Park Lot 12 Trail Category Park
Account 1 410 0000 4710 Account 3 Priority n a
Accou nt 2 Total Project Cost 317 000
Description I
Construction of an 8 foot wide asphalt trail in the Chanhassen nature preserve
Justification I
Represents the final phase in a four part trail construction initiative
Expenditures 2008 2009 2010 2011 2012 Total
Land Improvement 317 000 317 000
Total 317 000 317 000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 317 000 317 000
Total 317 000 317 000
OperatiolUll ImpactOther I
Maintenance and operations costs
275
Capital Improvement Program 2008 thru 2012
Contact
City of Chanhassen MN Department Park Trail Improvements
Project PK T 069 Type Improvement
Useful Life 50 Years
Project Name Hwy 41 Pedestrian Underpass Trail Grant Match Category Park
Accou nt 1 410 0000 4706 Account 3 Priority n a
Accou ot 2 Total Project Cost 125 000
Description I
Carver County has applied for a federal grant to provide these improvements The city has supported the application pledging a 115 000
contribution if the full grant is received
Justification I
A pedestrian underpass to M innewashta Regional Park is a highly sought after improvement
Expenditures 2008 2009 2010 2011 2012 Total
Construction 125 000 125 000
Total 125 000 125 000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 125 000 125 000
Total 125 000 125 000
Operational ImpactOther I
Maintenance and operations costs
276
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Account 1 410 000 4706 Account 3
Department Park Trail Improvements
Type Unassigned
Useful Life 25 years
Category Park
Priority n a
Project PK T 072
Project Name Tennis Court Repair
Accou nt 2 Total Project Cost 50 000
Description I
Patch and resurface courts
Justification I
We have deliberately limited the number of courts constructed within our system to lower overall maintenance costs associated with tennis courts
The courts we do offer are kept in playable condition through patching and resurfacing on a six to ten year cycle
Expenditures
Maintenance
2008 2009 2010
50 000
50 000
2011 2012 Total
50 000
50 000Total
Funding Sources
Park Dedication Fund
2008 2009 2010
50 000
50 000
2011 2012 Total
50 000
50 000Total
Operational ImpactOther I
Maintenance and operations costs
277
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact
Department Park Trail Improvements
Account 1 Account 3
Type Unassigned
Useful Life
Category Park
Priority n a
Project PK T 075
Project N lmc Liberty at Creekside Trail
Accouot 2 Total Project Cost 275 000
Descriptionl
The Liberty at Creek side trail is a 2600 foot pedestrian trail improvement tied to the development of Liberty at Creek side This trail will be
situated in the Bluff Creek preservation corridor traveling from the east west collector south to new Highway 212
Town and Country Homes is responsible for construction of this trail as a condition of their development contract with the city Upon completion
of the trail we will reimburse Town and Country Homes for the cost of the project materials
Justification I
This section of trail is identified on the Cities comprehensive trail plan The City has an obligation to construct it concurrent with development of
the surrounding properties
Expenditures
Construction
2008 2009 2010 2011 2012
275 000
275 000
Total
275 000
275 000Total
Funding Sources
Park Dedication Fund
2008 2009 2010 2011 2012
275 000
275 000
Total
275 000
275 000Total
Operational ImpactOther
Maintenance and operations costs
278
Capital Improvement Program
City ofChanhassen MN
2008 thru 2012
Contact
Department Park Trail Improvements
Type Unassigned
Useful Life 50 Years
Category Park
Priority n a
Pro ject PK T 076
Project Name The Preserve Trail and Bridge
Account 1 Account 3
Accou nt 2 Total Project Cost 250 000
Description I
The Preserve trai 1 is a 2800 foot pedestrian trai I improvement tied to the development of the Preserve This trail will be situated in the Bluff Creek
preservation corridor travel ing from the east west collector road north to Lyman Boulevard A large bridge crossing of Bluff Creek wil I be the
signature component of this project Rottlund Homes is responsible for the construction of the trail and bridge as a condition of their development
contract with the City Upon completion of the trail we will reimburse Rottlund Homes for the cost of the project materials
Justification I
This section of trail is identified on the Cities comprehensive trail plan The City has an obligation to construct it concurrent with development of
the surrounding properties
Expenditures
Construction
2008
250 000
250 000
2009 2010 2011 2012 Total
250 000
250 000Total
Funding Sources
Park Dedication Fund
2008
250 000
250 000
2009 2010 2011 2012 Total
250 000
250 000Total
Operational ImpactOther I
Maintenance and operations costs
279
Capital Improvement Program
City o f Chanhassen MN
2008 thru 2012
Contact
Department Park Trail Improvements
Project PK T 077 Type Unassigned
Useful Life 50 Years
Project NanlC Lakeside Trail Lyman Boulevard
Account 1 Account 3
Category Park
Priority n a
Accou ot 2 Total Project Cost 60 000
Description I
The Lakeside Trail is a foot extension of a trail already in place along Lyman Boulevard This section will connect with a future trail in Eden
Prairie Sienna Corporation is responsible for the construction of the trail as a condition of their development contract with the City Upon
completion of the trail we will reimburse Sienna Corporation for the cost of the project materials
Justification I
This section of trail is identified on the Cities comprehensive trail plan The City has an obligation to construct it concurrent with development of
the surrounding properties
Expenditures
Construction
2008
60 000
60 000
2009 2010 2011 2012 Total
60 000
60 000Total
Funding Sources
Park Dedication Fund
2008
60 000
60 000
2009 2010 2011 2012 Total
60 000
60 000Total
Operational ImpactOther I
Maintenance and operations costs
280
Capital Improvement Program 2008 thru 2012
Contact
City o fChanhassen MN Department Park Trail Improvements
PK T 078
Type Unassigned
Project Useful Life 50 Years
Project Name 2005 MUSA Park Acquisition and Development Category Park
Accou nt 1 Account 3 Priority n a
Account 2 Total Project Cost 400 000
Description I
Acquisition and development of a neighborhood park in the 2005 MUSA area
Justification I
This acquisition satisfies a significant void in the Cities comprehensive park plan It will serve neighborhood park needs for over 500 homes
located with 1 2 mile of its location
Expenditures 2008 2009 2010 2011 2012 Total
Land Acquisition 400 000 400 000
Total 400 000 400 000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 400 000 400 000
Total 400 000 400 000
Operational ImpactOther I
Maintenance and operations costs
281
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN Department Park Trail Improvements
Project PK T 079
Type Unassigned
Useful Life
Project Name Recreation Center fitness Equipment Category Park
Account 1 Account 3 Priority n a
Account 2 Total Project Cost 50 000
Description I
Purchase of new fitness room equipment for the recreation center over the next five years
Justification I
The fitness room equipment has not been replaced since the opening of the center in 1995 The equipment is now 12 years old with many pieces
nearing or past their useful life expectancy
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 10 000 10 000 10 000 10 000 10 000 50 000
Total 10 000 10 000 10 000 10 000 10 000 50 000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 10 000 1 0 000 10 000 10 000 10 000 50 000
Total 10 000 10 000 10 000 10 000 10 000 50 000
Operational ImpactOther I
Maintenance costs will be reduced
282
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN Department Park Trail Improvements
Project PK T 080
Type Unassigned
Useful Life
Project Name Recreation Center Lobby Furniture Category Park
Account 1 Account 3 Priority n a
Account 2 18 800TotalProjectCost
Description I
Purchase of new lobby furniture for the recreation center
Justification I
The existing furniture is original to the building s construction in 1995 After 12 years of use in a public recreation setting the existing furniture is
less than aesthetically pleasing
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 18 800 18 800
Total 18 800 18 800
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 18 800 18 800
Total 18 800 18 800
Operational ImpactOther I
283
Capital Improvement Program 2008 thru 2012 Contact
City 0 Chanhassen MN Department Park Trail Improvements
Project PK T 081 Type Improvement
Useful Life 30 Years
Project Name Lyman Blvd Trail Improvements Category Park
Accou nt 1 Account 3 Priority n a
Accou nt 2 Total Project Cost 500 000
Description 1
Pedestrain trail and underpass improvements along Lyman Boulevard from Powers Boulevard to Highway 41
Justification I
Lyman Boulevard is scheduled for reconstruction The best time to construct trail improvements is concurrent with theroad project
Expenditures 2008 2009 2010 2011 2012 Total
Construction 500 000 500 000
Total 500 000 500 000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 500 000 500 000
Total 500 000 500 000
I Operational ImpactOther I
Maintenance and operations costs
284
Capital Improvement Program 2008 thru 2012
Contact
City of Chanhassen MN Department Park Trail Improvements
Projcct PK T 082 Type Improvement
Useful Life 20 years
Project Nanlc Carver Beach Park Fishing Dock Extension Category Park
Account 1 Accou nt 3 Priority n a
Accou nt 2 Total Project Cost 3 000
Description I
Extension of existing dock at Carver Beach Park
Justification I
The current dock section is too short and does not allow for fishing
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 3 000 3 000
Total 3 000 3 000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 3 000 3 000
Total 3 000 3 000
Operational ImpactOther I
285
Capital Improvement Program 2008 thru 2012
Contact
City of Chanhassen MN Department Park Trail Improvements
Project PK T 083
Type Improvement
Useful Life 30 Years
Project Name Bluff Creek Drive Gap Trail Category Park
Account 1 Account 3 Priority n a
Accou nt 2 Total Project Cost 350 000
Description I
Construction of a 10 foot wide pedestrian trail from south of Pioneer Trail to the southwest LRT trail head
Justification I
The Highway 212 improvement project included a pedestrain trail along the first 2000 feet of Bluff Creek Drive The resulting trail gap or
missing link should be completed
Expenditures 2008 2009 2010 2011 2012 Total
Construction 350 000 350 000
Total 350 000 350 000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 350 000 350 000
Total 350 000 350 000
Operational ImpactOther I
Maintenance and operations costs
286
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN DepartJnent Park Trail Improvements
Project PK T 084 Type Improvement
Useful Life 30 Years
Project NanlC Pioneer Boulevard Gap Trail Category Park
Account 1 Account 3 Priority n a
Accou nt 2 Total Project Cost 300 000
Description I
Construction of a 10 foot wide pedestrian trail from Highway 101 to Powers Boulevard
Justification I
The Highway 212 improvement project included construction of a pedestrain trail along the majority of Pioneer Trail The remaining missing link
or gap between Powers Boulevard and Highway 101 should be completed
Expenditures 2008 2009 2010 2011 2012 Total
Construction 300 000 300 000
Total 300 000 300 000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 300 000 300 000
Total 300 000 300 000
Operational ImpactOther I
Maintenance and operations costs
287
Capital Improvement Program 2008 thru 2012
Contact
City of Chanhassen MN Department Park Trail Improvements
Project PK T 085 Type Equipment
Useful Life 30 Years
Project Name Disc Golf Course Contribution Category Park
Account 1 Account 3 Priority n a
Account 2 Total Project Cost 20 000
Description 1
The city is seeking a partner to construct a disc golf course The city wil1 provide the investment required to purchase equipment in the event that a
partnering entity has the land on which to build a course
Justification I
Disc golf is a very popular activity with many teenage participants
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 20 000 20 000
Total 20 000 20 000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 20 000 20 000
Total 20 000 20 000
Operational ImpactOther I
288
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Park Trail Improvements
Account 1 Account 3
Type Improvement
Useful Life 50 Years
Category Park
Priority n a
Project PK T 086
Project Name Lake Ann Park Ballfield SbelterlRestrooms
Accou nt 2 Total Project Cost 750 000
Description I
Construction of a permanent ballfield shelter at Lake Ann Park The building will include a concessions room seating area storage utility room
viewing balcony and modern restrooms
Justification I
Lake Ann Park is one of two remaining community parks without a full service park building Activity levels at the park justify this capital
investment
Expenditures
Construction
2008 2009 2010 2011
750 000
750 000
2012 Total
750 000
750 000Total
Funding Sources
Park Dedication Fund
2008 2009 2010 2011
750 000
750 000
2012 Total
750 000
750 000Total
Operational ImpactOther I
Maintenance and operations costs
289
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Planning
Type Improvement
Useful Life 1 0 1 5 years
Category Planning
Priority n a
Total Project Cost 30 000
Project PL OOl
Project N lmc Update of Comprehensive Plan
Account 1 Account 3
Accouot 2
Description I
Update to city s 2020 Comprehensive Plan Start the process in 2007 and complete in 2008
Justification I
Mandated by State Statute that the comprehensive plan be updated every 10 years This is an opportunity to evaluate and re evaluate the city s land
use designation and MUSA staging infrastructure plan roads sewer storm wter water and parks and open space
Expenditures
Camp Plan Update
2008
30 000
30 000
2009 2010 2011 2012 Total
30 000
30 000Total
Funding Sources
General Fund
2008
30 000
30 000
2009 2010 2011 2012 Total
30 000
30 000Total
Operatio al ImpactOther I
The update of the comprehensive provides additional information for capital improvements that may be needed to accommodate growth of the city
290
Capita Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact
Department Planning
Account 1 Account 3
Type Improvement
Useful Life 10 15 years
Category Planning
Priority n a
Project PL 002
Project Name County Rd 61 old 212 Corridor Study
Account 2 Total Project Cost 75 000
Description I
Corridor design along new County Road 61 and old State Highway 212
Justification I
The speci fic corridor study is an extension of the comprehensive plan identifing necessary improvements and developing configurements for
parcels along the right of way
Expenditures
Planning Design
2008 2009
75 000
75 000
2010 2011 2012 Total
75 000
75 000Total
Funding Sources
General Fund
2008 2009
75 000
75 000
2010 2011 2012 Total
75 000
75 000Total
Operational ImpactOther I
The corridor study will identify development potential and specific infrastructure improvements needed for development
291
Capital Improvement Program
City o f Chanhassen MN
88 012
2008 thru 2012
Contact Unassigned
Department Sanitary Sewer Improvements
Account 1 701 0000 4509 Account 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n a
Project
Project NanlC Inflow and Infiltration Abatement
Account 2 Total Project Cost 800 000
Description I
This annual project includes televising repairs and rehabilitation of existing sanitary sewer The program also detects and eliminates points of
entry of ground water and surface water into the City sanitary sewer system Projects have been identified from the 2006 Inflow and Infiltration
Report The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees
Justification I
City staff has identified numerous older sewer lines that are in need of repair The City of Chanhassen pays the Metropolitan Council for sewage
treatment Those payments are based on the amount of flow generated by the City of Chanhassen Surface water and ground water that makes its
way into the system either through breaks displaced joints manhole covers or private connections to the system increase the amount charged to
the City for sewage disposal and increasing the load on the City s lift stations Also MCES may place a surcharge on cities that are not trying to
improve the inflow and infiltration problem
Expenditures
Maintenance
2008
200 000
200 000
2009
200 000
200 000
2010
200 000
200 000
2011
200 000
200 000
2012 Total
800 000
800 000Total
Funding Sources
Sewer Utility Fund
2008
200 000
200 000
2009
200 000
200 000
2010
200 000
200 000
2011
200 000
200 000
2012 Total
800 000
800 000Total
Operational ImpactOther I
The efforts may decrease operational costs emergency cal1 outs and maintenance costs It is also the city s intent to use connection charges to help
fund for those costs It is the city s bel ief that as new customers come on line those connection fees should help fund future infiltration problems
292
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City of Chanhassen MN Departlnent Sanitary Sewer Improvements
SS O 14 Type Improvement
Project Useful Life Unassigned
Project Name Sanitary Sewer Replacement Category Utilities
Account 1 701 0000 4751 Account 3 Priority n a
Account 2 Total Project Cost 500 000
Description 1
Replacement or rehabi I itation of existing sanitary sewer lines in conjunction with the reconstruction of the City street
Justification I
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects
Expenditures 2008 2009 2010 2011 2012 Total
Construction 250 000 250 000 500 000
Total 250 000 250 000 500 000
Funding Sources 2008 2009 2010 2011 2012 Total
Sewer Utility Fund 250 000 250 000 500 000
Total 250 000 250 000 500 000
Operational ImpactOther I
Th is project wi II decrease maintenance costs
293
Capital Improvement Program
City of Chanhassen MN
Project SS 017
Project Name Sanitary Lift Station Rehabilitation Program
Account 1 701 0000 4751
Account 2
Accou nt 3
2008 thru 2012
Contact Unassigned
Department Sanitary Sewer Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n a
Total Project Cost 681 000
Description I
The sanitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment
The City currently maintains 3 1 I ift stations Many of these lift stations are high service pumps and need frequent servicing The program will
service or replace pumps pipe gallery and electrical components as needed The proposed lift stations for improvements are as follows
2008 4 5 6 and 2 2009 7 9 and 12 2010 8 and 24
2011 10 and 11 2012 16 and 21
Justificatio n I
Reduce emergency calls and potential sewer backups
Expenditures
Maintenance
Total
Funding Sources
Sewer Utility Fund
Total
Operational ImpactOther I
2008
140 000
140 000
2008
140 000
140 000
2009
76 000
76 000
2009
76 000
76 000
2010
260 000
260 000
2010
260 000
260 000
2011
105 000
105 000
2011
105 000
105 000
2012
100 000
100 000
Total
681 000
681 000
2012
100 000
100 000
Total
681 000
681 000
294
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City o f Chanhassen MN Department Sanitary Sewer Improvements
Project 88 018
Type Improvement
Useful Life Unassigned
Project Name Dell Road 77th Street Forcemain Replacement Category Utilities
Account 1 701 0000 4751 Account 3 Priority n a
Account 2 Total Project Cost t25 000
Description I
The forcel11ain on Dell Road and 77th Street that pumps the sewage from the industrial park has had several breaks in the past few years and needs
to be replaced This project will be included with the street improvements in 2009
Justification I
Eliminate emergency calls and sewer spills
Expenditures 2008 2009 2010 2011 2012 Total
Maintenance 125 000 125 000
Total 125 000 125 000
Funding Sources 2008 2009 2010 2011 2012 Total
Sewer Utility Fund 125 000 125 000
Total 125 000 125 000
Operational ImpactOther I
295
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Sanitary Sewer Improvements
Account 1 701 0000 4702 Account 3
Type Unassigned
Useful Life
Category Unassigned
P iority n a
Project 88 020
Project Name 2010 MUSA Sanitary Lift Station
Account 2 Total Project Cost 2 200 000
Description I
This lift station will be located on Powers Boulevard south ofTH 212 to service the future 2010 MUSA area and will also be used by future
MUSA areas
Justification I
Required for future developJllent of the 2010 MUSA area The cost will be assessed to future MUSA areas using connection fees
Expenditures
Construction
2008 2009 2010
2 200 000
2 200 000
2011 2012 Total
2 200 000
2 200 000Total
Funding Sources
Sewer Utility Fund
2008 2009 2010
2 200 000
2 200 000
2011 2012 Total
2 200 000
2 200 000Total
Operational ImpactOther I
296
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012 Contact
Department Sanitary Sewer Improvements
Project 88 021
Project Name Lift Station 3 Standby Generator
Type Unassigned
Useful Life
Accou nt 1 Account 3
Category Utilities
Priority n a
Account 2 Total Project Cost 80 000
Description I
Lift station 3 had improvements made to the station in 2007 These improvements included increasing the size of the wet well and a new pump
This lift station picks up 4 other smaerlift stations before discharging into the Metropolitan Council line It is critical this lift station be in
operation even if power is interupted A standby generator is recommended for this lift station for reliability The City has other standby
generators The City has 30 lift stations and it is difficult to operate all the lift stations with the City s few portable generators
Justification I
Increase reliability of lift station during power outages
Expenditures
Construction
2008
80 000
80 000
2009 2010 2011 2012 Total
80 000
80 000Total
Funding Sources
Sewer Utility Fund
2008
80 000
80 000
2009 2010 2011 2012 Total
80 000
80 000Total
Operational ImpactOther I
297
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City 0 Chanhassen MN Department Street Improvements
Project ST 001 Type Improvement
Useful Life Unassigned
Project Name West 78th St Streetlights Category S treets Hi ghways
Account 1 Account 3 Priority n a
Account 2 Total Project Cost 300 000
Description I
Install street lights on West 78th Street from the Western edge of Lake Ann Park to Century Blvd Street lights already exist on the section of
West 78th Street east of this section of road
Justification I
V isibi Iity wi 11 be improved with the installation of street lights
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 300 000 300 000
Total 300 000 300 000
Funding Sources 2008 2009 2010 2011 2012 Total
MSA 300 000 300 000
Total 300 000 300 000
Operational ImpactOther 1
This project will increase maintenance and electrical usage costs
298
Capital Improvement Program
City 0 Chanhassen MN
Project ST 003
Project Name Lyman Boulevard Improvements
Account 3
Total Project Cost 19 850 000
Accou nt 1
Accou nt 2
2008 thru 2012
Contact Unassigned
Department Street Improvements
Type Improvement
Useful Life Unassigned
Category
Priority n a
Description I
The city will need to participate in the reconstruction of Lyman Boulevard between Powers Boulevard and TH 41 The street segment is proposed
to be widened and urbanized to accommodate increased traffic volume from TH 212 new developments in the area and the new Chanhassen high
school Improvements include roadway widening signals stormsewer improvements trail improvement and trunk watermain improvement
Phase I 2008 Improvements include the roadway section from Galpin Blvd to Audubon south
Phase II 2010 Improvements are from Audubon south to Powers Blvd
Phase III 2012 Improvements are from Galpin Blvd to TH 41
Justification I
To improve safety and mobility along the corridor
Expenditures
Construction
Total
Funding Sources
Arterial Collector Dvlpmnt Fee
Assessment Revolving Assess
MSA
Other Agency Contribution
Park Dedication Fund
Sewer Utility Fund
Surface Water Utility Fund
Water Utility Fund
2008
8 950 000
8 950 000
2009 2010
5 300 000
5 300 000
2011 2012
5 600 000
5 600 000
Total
19 850 000
19 850 000
Total
1 250 000
400 000
3 577 000
11 673 000
850 000
100 000
1 500 000
500 000
19 850 000Total
Operational ImpactOther I
This project will increase maintenance costs in relation to the increase in City Utilities and Trails constructed with the project
2008 2009 2010 2011
250 000 1 000 000
400 000
1 243 000 490 000
5457 000 2 710 000
500 000 350 000
50 000 50 000
800 000 450 000
250 000 250 000
8 950 000 5 300 000
2012
1 844 000
3 506 000
250 000
5 600 000
299
Capital Improvement Program
City 0 Chanhassen MN
ST 012
2008 thru 2012
Contact Unassigned
Department Street Improvements
Type Improvement
Useful Life Unassigned
Category Streets Highways
Priority n a
Total Project Cost 14 436 000
Project
Project NanlC Annual Street Improvement Program
Account 1 601 0000 4751 Accou nt 3
Account 2
Description I
Annual project to rehabilitate and reconstruct streets in the City Current 5 year plan shows the following neighborhood areas
Residential 2008 Laredo Dr Ln Longview Dr Cimarron Circle and Highland Drive
2009 Chaparral and Saratoga Dr Cir
2010 Erie Ave area and Red Cedar Pt
2011 Carver Beach Rd area Sandy Hook Rd area Holly Ln Royal Oak Estates Crimson Bay Ches Mar and Timberwood
2012 Greenbriar Fir Tree Elm Tree Dogwood and Shore Drive
MSA 2009 Audubon Road Lyman Blvd to Lake Drive West
2010 West 78th Street
Justification I
The City uses a Pavement Management System to monitor the condition of the City streets While proper preventative maintenance extends the
life of the street and is cost effective a street will eventually deteriorate to a point that further maintenance is no longer cost effective
Rehabilitation projects extend the life of the street In cases with utility or poor subgrade needs to be replaced or where streets have deteriorated to
a point where rehabilitation will no longer be practical reconstruction of the street is necessary A feasibility study is written to consider the merits
of the project and scope of work
Prior
I 4436 000 I
1 0 t nI
Expenditures
Construction
2008
1 600 000
1 600 000
2009
3 500 000
3 500 000
2010
2 200 000
2 200 000
2011
1 200 000
1 200 000
2012
1 500 000
1 500 000
Total
10 000 000
10 000 000Total
Prior Funding Sources 2008 2009 2010 2011 2012 Total
I 4436 000 I AssessmentRevolving Assess 1 600 000 1 000 000 1 900 000 1 200 000 1 500 000 7 200 000
TotaJ MSA 2 500 000 300 000 2 800 000
Total 1 600 000 3 500 000 2 200 000 1 200 000 1 500 000 10 000 000
Operational ImpactOther
This project nlay decrease maintenance costs
300
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Street Improvements
Project ST 017 Type Improvement
Useful Life Unassigned
Category Streets HighwaysProjectNameTH101CorridorPreservationPlanning
Account 1 415 0000 4300 Account 3 Priority n a
Accou nt 2 Total Project Cost 500 000
Description I
A preliminary design environmental scoping study was completed in 2007 A study to complete the environmental assessment review for the
segment from Lyman Blvd to Pioneer Trail is scheduled for 2008 In 2010 a study to complete the environmental review is planned No funding
for improvenlcnts have been identified at this time
Justification I
To improve safety and mobility along the corridor and plan for future growth
Expenditures
Planning Design
2008
200 000
200 000
2009 2010
300 000
300 000
2011 2012 Total
500 000
500 000Total
Funding Sources 2008 2009 2010 2011 2012 Total
MSA 50 000 50 000 100 000
Other Agency Contribution 150 000 250 000 400 000
Total 200 000 300 000 500 000
Operational ImpactOther I
301
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact Paul Oehme
Departrnent Street Improvements
Type Maintenance
Useful Life 7 10 years
Category S treets Hi ghwa ys
Priority n a
Total Project Cost 2 310 000
Project ST 018
Project Name Pavement Management
Account 1 420 0000 4751 Account 3
Account 2
Description I
This project will provide maintenance such as crack sealing seal coating pothole patching for city streets The projects will be determined
annually based on the pavement condition index as generated by the pavement management program
Justification I
This will provide a centralized funding mechanism that will help reduce the effect on General Fund operating expenditures
Prior
385 000 J
l ot ll
Expenditures
Maintenance
2008
385 000
385 000
2009
385 000
385 000
2010
385 000
385 000
2011
385 000
385 000
2012
385 000
385 000
Total
1 925 000
1 925 000Total
Prior Funding Sources 2008 2009 2010 2011 2012 Total
I 385 000 I MSA 117 125 117 125 117 125 117 125 117 125 585 625
rrot ll T ax Levy 267 875 267 875 267 875 267 875 267 875 1 339 375
Total 385 000 385 000 385 000 385 000 385 000 1 925 000
Operational ImpactOther 1
This will reduce the need to reconstruct streets and will allow us to more closely match the life of streets to the utility lines that lie underneath
them This will allow better coordination when we need to replace water and sewer lines with replacing roads
302
Capital Improvement Program
City o f Chanhassen MN
2008 thru 2012
Contact
Department Street Improvements
Project ST 019 Type Unassigned
Useful Life
Project Name TH 5 Corridor Study TH 41 to TH 212
Accou nt 1 415 0000 4300 Account 3
Category Unassigned
Priority n a
Account 2 Total Project Cost 10 000
Description I
This is a joint project between Carver County MnDot and the cities along the corridor to plan for future improvements and complete the
environmental and preliminary design The first phase of the environmental review is anticipated to be completed in 2008 The project
programmed for 2009 is anticipated to complete the environmental assessment
Justification I
This study is the first step in preliminary design and scoping to plan for improvements to the corridor The city s portion of the project will be used
for the seglllent between TH 41 and the west city limits
Expenditures
Planning Design
2008 2009
10 000
10 000
2010 2011 2012 Total
1 0 000
10 000Total
Funding Sources
MSA
2008 2009
10 000
10 000
2010 2011 2012 Total
10 000
10 000Total
Operational ImpactOther I
303
Capital Improvement Program 2008 thru 2012
Contact
City of Chanhassen MN Department Street Improvements
Project ST 020
Type Improvemen t
Useful Life 7 1 0 years
Project N anlC Downtown Decorative Streetlights Signal Enhancemnt Category S treets Hi ghwa ys
Accou nt 1 Account 3 Priority n a
Accou ot 2 Total Project Cost 35 000
Description I
Most of the downtown decorative streetlights are not turned on because the bulbs are to bright and use too much power The decorative
streetlights and three signals west of Kerber Boulevard need painting The project is to paint all of the decorative downtown streetlights and three
signals and replace the bulbs in the streetlights to accent lighting
Justification I
To enhance the look of the downtown area
Expenditures 2008 2009 2010 2011 2012 Total
Construction 35 000 35 000
Total 35 000 35 000
Funding Sources 2008 2009 2010 2011 2012 Total
AssessmenURevolving Assess 35 000 35 000
Total 35 000 35 000
I
Operational ImpactOther I
304
Capita Improvement Program 2008 thru 2012 Contact Unassigned
City ofChanhassen MN Department Surface Water Management
J roj eet SWMP 012
Type Improvement
Useful Life Unassigned
Project Name SWMP Implementation Category SWMP
Accou nt 1 720 0000 4300 Accou nt 3 Pdority n a
Accou nt 2 Total Project Cost 2 000 000
Description I
This project implements projects identified as high priority by the City s Surface Water Management Plan the National Pollutant Discharge
Elimination System NPDES Phase II permit City Council and or City staff
Justification I
These projects are necessary to meet state and federal government requirements for storm drainage address storm water issues in existing
developments maintain existing infrastructure and construct the infrastructure recommended by the City s Surface Water Management Plan
Prior Expenditures 2008 2009 2010 2011 2012 Total
450 000 J Construction 350 000 300 000 300 000 300 000 300 000 1 550 000
rotll Total 350 000 300 000 300 000 300 000 300 000 1 550 000
I rior Funding Sources 2008 2009 2010 2011 2012 Total
I 450 000 I Surface Water Utility Fund 350 000 300 000 300 000 300 000 300 000 1 550 000
1 0 t al Total 350 000 300 000 300 000 300 000 300 000 1 550 000
Operational ImpactOther I
Citywide No map
305
Capital Improvement Program 2008 thru 2012 UnassignedContact
City 0 Chanhassen MN Department Surface Water Management
Project SWMP 014
Type Improvement
Useful Life Unassigned
Project N anlC Property Acquisition Category SWMP
Accou nt 1 720 0000 4701 Account 3 P jority n a
Account 2 410 0000 4701 Total Project Cost 850 000
Description I
The City will acquire property in accordance with its Comprehensive and Surface Water Management Plans
Justification I
Properties within the City must be acquired in order to achieve the goals set forth in the Comprehensive and Surface Water Management Plans
Expenditures 2008 2009 2010 2011 2012 Total
Land Acquisition 250 000 100 000 200 000 200 000 100 000 850 000
Total 250 000 100 000 200 000 200 000 100 000 850 000
Funding Sources 2008 2009 2010 2011 2012 Total
Surface Water Utility Fund 250 000 100 000 200 000 200 000 100 000 850 000
Total 250 000 100 000 200 000 200 000 100 000 850 000
Operational ImpactOther 1
Citywide No map
306
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Account 1 720 0000 4702 Account 3
Type Improvement
Useful Life Unassigned
Category SWMP
Priority n a
Project SWMP 019
Project Name Street Improvement Projects Storm Water Mgmt
Accou I1t 2 Total Project Cost 1 100 000
Description I
An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects
undertaken by the engineering and public works departments
Justification I
Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with
federal state and local regulations as well as protecting existing and proposed development adjacent to the projects
Expenditures
Construction
2008
400 000
400 000
2009 2010
300 000
300 000
2011 2012
400 000
400 000
Total
1 100 000
1 100 000Total
Funding Sources
Surface Water Utility Fund
Total
2008
400 000
400 000
2009 2010
300 000
300 000
2011 2012
400 000
400 000
Total
1 100 000
1 100 000
Operational ImpactOther I
Inventory inspection and maintenance of new infrastructure will be required Citywide No map
307
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Account 1 720 0000 4705 Account 3
Type Equipment
Useful Life 10 15 years
Category SWMP
Priority n a
Project SWMP 021
Project Name Leaf Vacuum
Account 2 Total Project Cost 40 000
Description I
Purchase of a leaf vacuum trailer to address street sweeping requirements ofNPDES Phase II MS4 permit
Justification I
A leaf vacuum wi II be more effective at picking up leaves wet and dry from streets than a street sweeper This will prolong the life of the street
sweeper which is a more expensive piece of equipment The leaf vacuum also shreds leaves to increase productivity between dumping
Expenditures
Equipment
2008 2009 2010
40 000
40 000
2011 2012 Total
40 000
40 000Total
Funding Sources
Surface Water Utility Fund
2008 2009 2010
40 000
40 000
2011 2012 Total
40 000
40 000Total
Operational ImpactOther I
The collected material wi II have to be disposed of properly
308
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Project SWMP 022 Type Equipment
Useful Life 10 15 years
Category SWMPProjectNnmcExcavator
Account 1 720 0000 4705 Account 3 P iority n a
Aceou ot 2 Total Project Cost 70 000
Description I
Purchase of a small excavator designed with rubber tracks to access storm water infrastructure for maintenance purposes Equipment will have a
boom capable of revolving 360 degrees
Justification I
The small size of th is excavator wi 11 allow street crews to maintain infrastructure in small easements or in areas with limited access potential Light
weight minimizes damage to properties Revolving boom minimizes site disturbance Once inventory and inspection of stormwater infrastructure
has taken place it is anticipated that many ponds and drainageways will require maintenance to comply with NPDES Phase II
Expenditures
Equipment
2008 2009 2010
70 000
70 000
2011 2012 Total
70 000
70 000Total
Funding Sources
Surface Water Utility Fund
Total
2008 2009 2010
70 000
70 000
2011 2012 Total
70 000
70 000
Operational ImpactOther I
309
Capital Improvement Program
City o f Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Project SWMP 023
Type Equipment
Useful Life Unassigned
Category SWMPProjectNameVactorUsed
Account 1 720 0000 4705 Accou nt 3 Priority n a
Actou nt 2 Total Project Cost 200 000
Description I
Purchase of a small vactor truck for maintenance of storm water infrastructure
Justification I
Development adds stormwater infrastrucure Currently street department shares equipment with utility department Utility department has
increased use of current vactor and streets department has increased need for additional vactor The small vactor will be used off road in easements
where the larger vactor cannot maneuver Also the small vactor will be used on trails where the larger vactor should not go do due to damage it
caused to the bituminous trail due to its weight Will increase efficiency of SWMP cleanouts and other maintenance Will also serve as a backup
to current vactor in an emergency Will assist in achieving compliance with NPDES Phase II MS4 permit
Expenditures
Equipment
2008 2009
200 000
200 000
2010 2011 2012 Total
200 000
200 000Total
Funding Sources
Surface Water Utility Fund
Total
2008 2009
200 000
200 000
2010 2011 2012 Total
200 000
200 000
Operational ImpactOther I
The co Ilected material wi II have to be disposed of properly
310
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City o f Chanhassen MN Department Surface Water Management
Project SWMP 024 Type Improvement
Useful Life Unassigned
Project Name Bluff Cr Nat Resources Mgmt Plan Implementation SWMPCategory
Account 1 720 0000 4751 Account 3 Priority n a
Accou nt 2 Total Project Cost 900 000
Description I
Construction and restoration as recommended in the Bluff Creek Natural Resource Management Plan It is unknown how much funding the Riley
Purgatory Bluff Creek Watershed District will contribute to this project Will assist in achieving compliance with NPDES Phase II MS4 Permit
Justification I
Implementation of recommendations in 1996 Bluff Creek Natural Resource Management Plan in cooperation with the Riley Purgatory Bluff Creek
Watershed District These projects will improve habitat and aesthetics in the Bluff Creek Watershed
p ri 0r Expenditures 2008 2009 2010 2011 2012 Total
150 000 I Construction 150 000 150 000 150 000 150 000 150 000 750 000
rot Total 150 000 150 000 150 000 150 000 150 000 750 000
Prior Funding Sources 2008 2009 2010 2011 2012 Total
I 150 000 J Surface Water Utility Fund 150 000 150 000 150 000 150 000 150 000 750 000
rot ll Total 150 000 150 000 150 000 150 000 150 000 750 000
Operational ImpactOther I
I The restored areas will require regular maintenance to sustain the native plant communities
311
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN Department Surface Water Management
Project SWMP 026 Type Improvement
Useful Life
Project Name Lake Minnewashta Outlet SWMPCategory
Accou nt 1 720 0000 4751 Accou nt 3 PI iority n a
Accou nt 2 Total Project Cost 30 000
Description I
lnstall a permanent outlet structure at the outlet for Lake Minnewashta
Justification I
The current outlet is sand and is therefore easily altered Alterations to the outlet can cause the entire lake to drain down to the outlet elevation
Expenditures 2008 2009 2010 2011 2012 Total
Construction 30 000 30 000
Total 30 000 30 000
Funding Sources 2008 2009 2010 2011 2012 Total
Surface Water Utility Fund 30 000 30 000
Total 30 000 30 000
Operational ImpactOther I
None
312
Capital Improvement Program 2008 thru 2012
Contact
City of Chanhassen MN Department Surface Water Management
I Pro i ect SWMP 027 Type Improvement
Useful Life
Project N a Ole Natural Resources Stewardship Plan Category SWMP
Account 1 720 7202 4300 Account 3 Priority n a
Account 2 Total Project Cost 180 000
Description I
This project would develop and implement over time a stewardship plan for all public natural resources
Justification I
The plan is necessary to enhance and protect the city s public natural resource investments in land and vegetation The plan could prioritize
strategies sites and processes as well as inventory the existing conditions of publically held properties
Prior Expenditures 2008 2009 2010 2011 2012 Total
I 50 000 I Planning Design 50 000 20 000 20 000 20 000 20 000 130 000
rot ll Total 50 000 20 000 20 000 20 000 20 000 130 000
Prior Funding Sources 2008 2009 2010 2011 2012 Total
I 50 000 I Reforestation 50 000 20 000 20 000 20 000 20 000 130 000
1 0t nl Total 50 000 20 000 20 000 20 000 20 000 130 000
Operational ImpactOther I
313
Capital Improvement Program
City o f Chanhassen MN
2008 thru 2012
Contact
Department Surface Water Management
Project SWMP 029 Type Improvement
Useful Life
Project NanlC Landings Court Storm Water Pond Imp Category SWMP
Account 1 Account 3 Priority n a
Account 2 Total Project Cost 70 000
Description I
This project addresses storm water quantity issues entering Lake Minnewashta This project was discussed with the City Council during the
Boulder Cove development application The improvements include ponding and additional storm water piping to the lake
Justification I
To help address erosion and reduce storm water discharge rates into Lake Minnewashta
Expenditures
Construction
2008
70 000
70 000
2009 2010 2011 2012 Total
70 000
70 000Total
Funding Sources
Surface Water Utility Fund
Total
2008
70 000
70 000
2009 2010 2011 2012 Total
70 000
70 000
Operational ImpactOther I
314
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012 Contact
Department Surface Water Management
Project SWMP 030 Type Improvement
Useful Life
Project Nnmc Lake Susan Shoreline Restoration Improvements
Account 1 Account 3
Category SWMP
Priority n a
Aceou nt 2 Total Project Cost 90 000
Descriptionl
Residents around Lake Susan have requested the City of Chanhassen to repair shoreline erosion problems Restoration of the shoreline took place
at Lake Susan Park in 2006 The restoration under this project is similar in nature to the 2006 project The funding from Other Agency
Contributions will come from Water Shed District funds
Justification I
To reduce shoreline erosion
Expenditures
Construction
2008
90 000
90 000
2009 2010 2011 2012 Total
90 000
90 000Total
Funding Sources
Other Agency Contribution
Surface Water Utility Fund
Total
2008
39 000
51 000
90 000
2009 2010 2011 2012 Total
39 000
51 000
90 000
Operational ImpactOther I
315
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN Department Surface Water Management
Project SWMP 031 Type Improvement
Useful Life
Project Name West Lotus Lake Drainage Improvements Category SWMP
Account 1 Account 3 Priority n a
Account 2 Total Project Cost 800 000
Description I
This improvement project addressess storm water quality and quantity issues in the Lotus Lake water shed In 2005 the regional pond over topped
causing significant damage down stream The storm water ponding in this area was discussed with the City Council during the review of the Lotus
Woods development The Water Shed District has made Lotus Lake a high priority in their capital improvement plan It is proposed the City work
jointly with the Water Shed District on this project The funding from Other Agency Contributions will come from Water Shed District funds
Justification I
To improve water quality and quantity in the Lotus Lake water shed
Expenditures 2008 2009 2010 2011 2012 Total
Construction 400 000 400 000 800 000
Total 400 000 400 000 800 000
Funding Sources 2008 2009 2010 2011 2012 Total
Other Agency Contribution 200 000 200 000 400 000
Surface Water Utility Fund 200 000 200 000 400 000
Total 400 000 400 000 800 000
i
Operational ImpactOther I
316
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City o f Chanhassen MN Department Water System Improvements
Project W 015 Type Improvement
Useful Life Unassigned
Project Name Repainting West 76th St Water Tower Category Utilities
Account 1 700 0000 4751 Account 3 P iority n a
Account 2 Total Project Cost 80 000
Description I
Provides for the recoating of the interior and exterior surfaces of the W 76th St Water Tower The water tower is currently not used for water
storage because of the hydraulic changes that were made when the Lake Lucy Road Powers Boulevard tower was made
Justification I
This type of infrastructure requires repainting to protect the metal structure so more costly repairs can be avoided
Expenditures 2008 2009 2010 2011 2012 Total
Construction 80 000 80 000
Total 80 000 80 000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 80 000 80 000
Total 80 000 80 000
i Operational ImpactOther I
This project does not increase operational costs
317
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Water System Improvements
Account 1 Account 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n a
Project W 020
Project Nume Arboretum Water Main
Accou nt 2 Total Project Cost 220 000
Description I
Installation of a missing piece of water main to provide better looping and system reliability between the Arboretum Water Tower and W 78th
Street
Justification I
Completing this section of water main will complete a missing loop in the system providing improved water quality and pressure as well as
increasing operational reliability This project was identified in the 2003 Master Water Study
Expenditures 2008 2009 2010 2011 2012 Total
Planning Design 20 000 20 000
Construction 200 000 200 000
Total 220 000 220 000
Funding Sources
Water Utility Fund
2008 2009 2010
220 000
220 000
2011 2012 Total
220 000
220 000Total
Operational ImpactOther I
This project will increase maintenance costs
318
Capital Improvement Program
City o f Chanhassen MN
2008 thru 2012 Contact Unassigned
Department Water System Improvements
Account 1 700 0000 4751 Account 3
Type Improvement
Useful Life Unassigned
Category Utilities
P 4iority n a
Project W 024
Project Name Watermain Replacement
Account 2 Total Project Cost 2 060 000
Description I
Replacement of existing water main lines in coordination with the reconstruction of the City street
Justification I
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects and also to avoid potential cuts in recently improved streets If significant repairs are necessary to the existing water
main replacement may be the Inost cost effective option Given the highly corrosive soils in the City water main replacement is an ongoing
project in the City
Expenditures
Construction
2008
660 000
660 000
2009 2010
700 000
700 000
2011 2012
700 000
700 000
Total
2 060 000
2 060 000Total
Funding Sources
Water Utility Fund
2008
660 000
660 000
2009 2010
700 000
700 000
2011 2012
700 000
700 000
Total
2 060 000
2 060 000Total
Operational ImpactOther I
These projects will decrease maintenance costs
319
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Water System Improvements
Account 1 700 0000 4751 Account 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n a
Proiect W 025
Project Name Well 4 Improvements
Account 2 Total Project Cost 350 000
Description I
Engineering has reviewed the test data of the water from Well 4 and currently the radium levels are at the upper end of the MDH guidelines In
2004 staff reviewed the radium problems with the Minnesota Dept of Health MDH The well is currently used as a peak well during high
demand periods which blends the Well 4 water with the other well water in the system If the radium levels continue to rise the City may have to
enter into a monitoring program with the MDH on a temporary basis The MDH at that time will determine the acceptable amount of water that
can be pumped into the City system from Well 4 If an agreement with the MDH cannot be reached the well may have to be redeveloped capped
or have a small treatment plant built for this well Well 4 is also a high producer of iron and manganese Redevelopment of the well is budgeted
for 2009
Justification I
Well 4 continues to test high for RADIUM and is a high producer of iron and manganese which creates rusty water
Expenditures
Construction
2008 2009
350 000
350 000
2010 2011 2012 Total
350 000
350 000Total
Funding Sources
Water Utility Fund
2008 2009
350 000
350 000
2010 2011 2012 Total
350 000
350 000Total
Operational ImpactOther I
This project will not increase operations cost
320
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Water System Improvements
Account 1 700 0000 4751 Account 3
Type Improvement
Useful Life Unassigned
Category
Priority n a
Project W 027
Project Name Pressure Reducing Station 8
Account 2 Total Project Cost 215 000
Description I
Construction of a pressure reducing valve station in the 2005 MUSA area by Pioneer Trail is programmed for 2008 if the development along
Pioneer Trail is constructed Two pressure reducing stations are programmed for the 2010 MUS A area
Justification I
Identified in the 2010 Comprehensive Water Supply Plan Needed to control watermain pressure due to elevation changes
Expenditures
Construction
2008
65 000
65 000
2009 2010
150 000
150 000
2011 2012 Total
215 000
215 000Total
Funding Sources
Water Utility Fund
2008
65 000
65 000
2009 2010
150 000
150 000
2011 2012 Total
215 000
215 000Total
Operational ImpactOther I
This project will increase maintenance costs
321
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact Unassigned
Departrnent Water System Improvements
Account 1 700 0000 4751 Account 3
Type Improvement
Useful Life Unassigned
Category
Priority n a
Project W 030
Project Name Raw Well Water Collection System
Accou nt 2 Total Project Cost 500 000
Description I
This project includes designing and installing watermain from new and existing well sites to the phase II treatment plant at the west end of the city
Justification I
Raw water lines are required to feed the water directly from the wells to the treatment plant prior to distribution to the water system These
imporvements were identified in the 2003 Master Water Plan
Expenditures
Construction
2008 2009 2010 2011 2012
500 000
500 000
Total
500 000
500 000Total
Funding Sources
Water Utility Fund
2008 2009 2010 2011 2012
500 000
500 000
Total
500 000
500 000Total
Operat onallmpactOther I
This project will increase maintenance costs
322
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City 0 Chanhassen MN Department Water System Improvements
I W 032 Type Improvement
I ProJect Useful Life Unassigned
Project Name Well Rehabilitation Program Category Uti 1ities
Account 1 700 0000 4530 Account 3 PI iority n a
Accou nt 2 Total Project Cost 255 000
Description I
This program annually inspects and performs regular maintenance of the City s wells Well pumps are recommended to be serviced every 8 years
In 2008 it is recommended that the pumps in wells 2 and 3 be lowered because of the drop in the aquifer levels
Justification I
To extend the life and ensure reliability of the City s well fields Performing regular maintenance will extend the life of well components reduce
emergency calls and have a more reliable water supply system
Expenditures 2008 2009 2010 2011 2012 Total
Maintenance 80 000 40 000 45 000 45 000 45 000 255 000
Total 80 000 40 000 45 000 45 000 45 000 255 000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 80 000 40 000 45 000 45 000 45 000 255 000
Total 80 000 40 000 45 000 45 000 45 000 255 000
Operational ImpactOther I
323
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012 Contact
Department Water System Improvements
Project W 037
Type Improvement
Useful Life
Project Name West Water Treatment Plant
Account 1 Account 3
Category Utilities
Priority n a
Account 2 Total Project Cost 11 000 000
Description I
The treatment of potab Ie water for the high zone area and the west side of town is planned for construction in 2012 This treatment plant along
with the east treatment plant wi II treat the city s potable water for an average day s usage
Justification I
To remove iron and l11anganese from the water prior to distributing
Expenditures
Construction
2008 2009 2010 2011 2012
11 000 000
11 000 000
Total
11 000 000
11 000 000Total
Funding Sources
Revenue Bonds
2008 2009 2010 2011 2012
11 000 000
11 000 000
Total
11 000 000
11 000 000Total
Operational ImpactOther I
324
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012 Contact
Department Water System Improvements
Project W 038
Project Name Stand by Generator for wells
Type Unassigned
Useful Life
Account 1 700 0000 4705 Accou nt 3
Category Unassigned
Priority n a
Account 2 Total Project Cost 120 000
Description I
With the addition of the water treatment plant standby generation for wells is needed to keep water supplied to the treatment plant The treatment
plant has a standby generator for the plant but only one well The requested standby generator will be able to run an additional two wells This
wi II allow the plant to treat water to meet an average day demand
Justification I
To meet average day water demand for the city if power is disrupted for an extended period of time
Expenditures
Equipment
2008
120 000
120 000
2009 2010 2011 2012 Total
120 000
120 000Total
Funding Sources
Water Utility Fund
2008
120 000
120 000
2009 2010 2011 2012 Total
120 000
120 000Total
Operational ImpactOther I
325
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact
Department Water System Improvements
Account 1 Accou nt 3
Type Unassigned
Useful Life
Category Utilities
Priority n a
Project W 039
Project Name Audubon South Watermain Loop
Account 2 Total Project Cost 150 000
Description 1
This watermain project will extend watermain from the intersection of Lyman Blvd and Audubon south along Audubon to connect to the Liberty
on Bluff Creek development Service will be provided to the existing homes along Audubon
Justification I
To service existing homes along Audubon and profice a watermain loop for properties in the area To provide a loop watermain system for the area
Expenditures
Construction
2008
150 000
150 000
2009 2010 2011 2012 Total
150 000
150 000Total
Funding Sources
AssessmenURevolving Assess
Water Utility Fund
2008
20 000
130 000
150 000
2009 2010 2011 2012 Total
20 000
130 000
150 000Total
Operational ImpactOther I
326
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN Department Water System Improvements
Proiect W 040
Type Unassigned
Useful Life
Project N anle Repaint Melody Hills Water Tower Category Utilities
Accou nt 1 Account 3 Priority n a
Accou nt 2 Total Project Cost 300 000
Description I
Provides for the recoating of the interior and exterior surfaces of the Melody Hills water tower
Justification I
Steel water towers require recoating to protect the metal and to prevent more costly repairs
Expenditures 2008 2009 2010 2011 2012 Total
Construction 300 000 300 000
Total 300 000 300 000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 300 000 300 000
Total 300 000 300 000
Operational ImpactOther I
327
Capital Improvement Program 2008 thru 2012
Contact
City o Chanhassen MN Department Water System Improvements
Project W 041 Type Unassigned
Useful Life
Project Name Repaint Lake Lucy Water Stand Pipe Category Uti 1 i ti es
Accou nt 1 Account 3 Priority n a
Account 2 Total Project Cost 550 000
Description I
This project will repaint the interior and exterior surfaces of the Lake Lucy stand pipe
Justification I
Steel tanks require recoating to protect the metal to prevent more costly repairs
Expenditures 2008 2009 2010 2011 2012 Total
Construction 550 000 550 000
Total 550 000 550 000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 550 000 550 000
Total 550 000 550 000
Operational ImpactOther I
328
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact
Department Water System Improvements
Project W 042
Project Name High Zone Elevated Storage Tank
Type Unassigned
Useful Life
Account 1 Account 3
Category Utilities
PI iority n a
Accou nt 2 Total Project Cost 1 850 000
Description I
Based on current and projected system demands the high zone should have additional storage capacity The 2008 water comprehensive plan
recommends a total of 750 000 gallons for storage Currently the high zone only has 200 000 gallons of storage
Justification I
To meet current and future water demands for the high zone area and to meet recommended fire flow storage requirements
Expenditures
Construction
2008 2009 2010
1 850 000
1 850 000
2011 2012 Total
1 850 000
1 850 000Total
Funding Sources
Water Utility Fund
2008 2009 2010
1 850 000
1 850 000
2011 2012 Total
1 850 000
1 850 000Total
Operational ImpactOther I
329
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN Department Water System Improvements
Project W 043 Type Improvement
Useful Life
Project Nanle Well 14 Improvements UtilitiesCategory
Accou nt 1 Account 3 Priority n a
Account 2 Total Project Cost 1 200 000
Description I
This well is proposed to meet the water needs of the growing community
Justification I
To meet the growing water needs of the city
Expenditures 2008 2009 2010 2011 2012 Total
Construction 1 200 000 1 200 000
Total 1 200 000 1 200 000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 1 200 000 1 200 000
Total 1 200 000 1 200 000
I
Operational ImpactOther I
330
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN Department Water System Improvements
I Pro iee W 044 I Type Unassigned
Useful Life
ProJcct Nanle Well 13 Category Utilities
Accou nt 1 Account 3 Priority n a
Accou ot 2 Total Project Cost 1 200 000
Description I
This well is proposed to replace the lost capacity of well 6
Justification I
To meet the peak summer irrigation demands of the city
Expenditures 2008 2009 2010 2011 2012 Total
Construction 1 200 000 1 200 000
Total 1 200 000 1 200 000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 1 200 000 1 200 000
Total 1 200 000 1 200 000
Operational ImpactOther I
331
Capital Improvement Program
City 0 Chanhassen MN
2008 thru 2012
Contact
Account 1 Account 3
Departlnent Water System Improvements
Type Unassigned
Useful Life
Category Utilities
Priority n a
Project W 045
Projcct Name West Junior High School Well
Account 2 Total Project Cost 715 000
Description I
This improvement will convert the school well from a stand by well into a regular producing municipal well Currently the well can only produce
250 gpm It is anticipated the well could produce as much as 800 gpm The project consists of a new submersible pump and using some electrical
components from well 5 that are anticipated to be decommissioned A new water main is necessary to be extended to well 7 well house for
chel111cal treatment Valve improvements are also anticipated to have the ability to bleed this water out of the high zone pressure area
Justification I
To meet the current water demand of the city
Expenditures
Construction
2008
715 000
715 000
2009 2010 2011 2012 Total
715 000
715 000Total
Funding Sources
Water Utility Fund
2008
715 000
715 000
2009 2010 2011 2012 Total
715 000
715 000Total
Operational ImpactOther I
332
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN Department Water System Improvements
Project W 046 Type Unassigned
Useful Life
Project N lme Low Zone 1 million gallon Elevated Storage Tank Category Utilities
Account 1 Account 3 PI iority n a
Account 2 Total Project Cost 2 500 000
Description I
This tank is needed to l11eet the peak day and potential emergency demand for the growth of the community
Justification I
To meet peak demand and emergency water demand for the growing community
Expenditures 2008 2009 2010 2011 2012 Total
Construction 2 500 000 2 500 000
Total 2 500 000 2 500 000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 2 500 000 2 500 000
Total 2 500 000 2 500 000
Operational ImpactOther I
333
Capital Improvement Program 2008 thru 2012
Contact
City 0 Chanhassen MN Department Water System Improvements
Project W 047 Type Unassigned
Useful Life
Project Name Well 12 Improvements Category Utilities
Accou nt 1 Account 3 Priority n a
Account 2 Total Project Cost 940 000
Description I
This well is proposed to replace the lost capacity of Well 5
Justification I
To meet the peak summer irrigation demands of the city
Expenditures 2008 2009 2010 2011 2012 Total
Construction 940 000 940 000
Total 940 000 940 000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 940 000 940 000
Total 940 000 940 000
Operational ImpactOther I
334
CITY OF CHANHASSEN DECEMBER
TAX LEVY
2008 Budget
2007 2008 Percent
TAX CAPACITY BASED TAX LEVY Levy Levy Increase
General Fund 6 558 100 6 833 900 4 21 275 800
Capital Replacement Fund for equipment 824 000 824 000 0 00
Pavement Mgmt Fund Sealcoating 250 750 267 875 6 83
Special Assessment Debt 129 500 100 00
General Obligation Debt 488 280 484 873 0 70
General Obligation Debt 212 Bonds 80 000 285 000 256 25
Local Street Improvements 100 000 100 00
Debt of Other Agencies EDA 122 548 122 703 0 13
TOTAL TAX CAPACITY BASED TAX LEVIES 8453 178 8 918 351 5 50
MARKET VALUE TAX LEVY
Park Referendum 696 500 695 900 0 09
Library Referendum 489 100 490 700 0 33
TOTAL MARKET VALUE TAX LEVY 1 185 600 1 186 600 0 08
Use of cash reserves 63 000 269 986
TOTAL TAX LEVY 9 575 778 9 834 965 2 71
Dollar Increase 259 187
Scenario 1
Taxes applied to General Fund
Capital Replacement
Pavement Mgmt
Total Levy subject to levy limits
Bond Funds
Local Street Improvements
Reduction in OS Levy
Total
6 833 900
824 000
267 875
7 925 775
2 079 176
100 000
269 986
9 834 965
Tax Generation Capacity
Prior Year
New Construction
Exsiting MV Inc
TIF Oist 1
Eden Trace TIF
Gateway TIF
9 575 616
172 361
0
0
0
0
Total Capacity 9 747 977
335
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
MEMORANDUM
TO Todd Gerhardt City Manger
FROM Greg Sticha Finance Director
DATE December 10 2007
SUBJ Adoption of Ordinance Chapter 4 Chanhassen City Code
License Permit and Administrative Fees
ACTION REQUIRED
A simple majority vote of City Council present
BACKGROUND
The city attorney s office recommends that the fees be adopted by ordinance These rates
will be effective January 1 2008
DISCUSSION
SURFACE WATER MANAGEMENT PLAN Section 4 30 c 3
The City s Surface Water Management Plan SWMP was adopted in February 1994
The SWMP recommended the City establish surface water connection fees as a means of
financing citywide improvements recommended in the SWMP Connection fees are
charged to subdivisions prior to final plat approval to recoup the costs of the installation
and maintenance of public storm water infrastructure
The connection charges were derived from estimating the costs of all the pipes and ponds
proposed in the SWMP The total cost has been apportioned so developments are
charged according to the number of acres developed and the land use The fee per acre
varies by land use as a result of the amount of impervious surface allowed within that
land use category
At that time the rates were calculated using market values of land in the City of
Chanhassen and the construction cost index In the SWMP it was noted that the rates
should be increased annually in line with the construction price index but until 2002
the fees had not been updated since adoption
Proposed
Land Use 2003 2004 2005 2006 2007 2008
Single Family Residential 994 1 028 1 093 1 600 1 900 2 360
Duplex 1 033 1 120 1 191 1 800 2 200 2 640
Townhome 1 814 1 967 2 091 3 100 3 700 4440
School Church 1 772 1 920 2 041 3 100 3 700 4440
Apartmentmulti fami Iy 1 945 2 108 2 241 3400 4 100 4 920
Industrial 5494 5 955 6 330 9 500 11400 13 680
Commercial 7 008 7 596 8 075 12 100 14 500 17400
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play336
Mr Todd Gerhardt
December 10 2007
Page 2
Water Quantity
Proposed
Land Use 2003 2004 2005 2006 2007 2008
Single FamilyLow Density 2 348 2 545 2 705 2 900 3 100 3410
Medium Density 3 528 3 824 4 065 4400 4 700 4 700
High Density 5 171 5 604 5 957 6400 6 800 7 280
CommercialllndustriallB usiness 5 171 5 604 5 957 6400 6 800 6 820
Parks Open Space 1411 1 530 1 626 1 700 1 800 1 930
SEWER AND WATER FEES Section 4 30 c 5
Based on the recommendations of the Utility Rate Study completed by Ehlers Associates
discussed on November 27 2006 the water and sanitary sewer trunk hook up charges are to be
revised each year For 2008 the utility study recommends a 6 increase in the fee In 2007 the
City began collecting 30 percent of the sewer and water charges at the time of final plat approval
Sewer ChargesLot Water Charges Lot
Lateral Connection 5 924 Lateral Connection Charge 5 924
Charge
Trunk Hookup Charge 1 769 Trunk Hookup Charge 4 799
Lake Ann sub trunk Charge
Lake Ann Interceptor Charge
1 587
1 514
A lateral connection charge replaces a missed assessment When the City installs a pipe next to a
property some owners choose not to connect In some instances the City may not have assessed
the property owner for their portion of the pipe When those properties eventually connect the
lateral connection charge approximately covers the cost of the omitted assessment These
charges are only levied in rare instances Trunk hook up charges on the other hand are for core
utility infrastructure such as wells lift stations and trunk main oversizing Every new lot in the
City that hooks up to the utility system pays a trunk hook up charge
Additionally the Metropolitan Council is increasing the sewer access charge SAC by 150 00
for 2008 This change is incorporated in the proposed ordinance
UTILLITY RATES Section 4 45
In 2007 we had some significant water usage events that caused staff to consider adding tiers to
our current water rates We also had recommendations from the DNR and our financial advisors
to consider adding tiers to promote water conservation and help pay for infrastructure
improvements needed because of the water usage events from this summer After a couple City
Council work session meetings staff and Council have decided to add one tier to our current
water rate billing structure for water consumed over 50 000 gallons per quarter
337
Mr Todd Gerhardt
December 10 2007
Page 3
Listed Below is the current and proposed water consumption rate structure
2007 Rates 2008 Proposed Rates 2008 Alternative
0 25 000 Gallons
25 000 50 000
50 000
1 81 5 Inc
2 26 5 Inc
2 62 22 Inc
1 72
2 15
N A
179 2 Inc
226 5 Inc
2 69 25 Inc
The attached ordinance calls for the 5 5 and 22 increases but could be amended for the
alternative proposal of 2 5 and 25 increases We will be notifying residents of the tiered
rate structure and increases through our Maple Leaf and Chanhassen Connection Publications as
well as on our website
Utility rates are established for each 1 000 gallons of usage
Water less than 25 000 gallons per quarter
25 000 to 50 000 gallons per quarter
amount greater than 50 000 gallons per quarter
minimum water charge per quarter
for amounts up to 5 000 gallons per quarter
Bulk sales to contractors landscapers etc at
City fill stations or other designated locations
Sewage residential based on winter quarter usage
commercial based on actual quarterly usage
minimum sewage charge per quarter
for amounts up to 5 000 gallons per quarter
SURFACE WATER MANAGEMENT FEES Section 4 50
1 81 per 1 000 gallons
2 26 per 1 000 gallons
2 62 per 1 000 gallons
9 00
4 50 per 1 000 gallons
343 per 1 000 gallons
343 per 1 000 gallons
17 50
The utility factor for each land use is not changing The rates are increasing 4 percent for 2008
The rates for tax parcels classified 1 2 or 3 shall increase from 7 80 to 8 11 The rates for tax
parcels classified 4 through 8 shall increase from 15 22 to 15 83
RECOMMENDA TION
Staff recommends that City Council adopt the attached ordinance amending Chapter 4 of the
Chanhassen City Code
A TTACHMENTS
1 Ordinance Amending Chapter 4 Chanhassen City Code
g plan bg city code cc memo ch 4 fees 2008 doc
338
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
ORDINANCE NO
AN ORDINANCE AMENDING CHAPTER 4
CHANHASSEN CITY CODE
LICENSE PERMIT AND ADMINISTRATIVE FEES
THE CITY COUNCIL OF THE CITY OF CHANHASSEN MINNESOTA ORDAINS
Section 1 Section 4 30 c 3 of the City Code City of Chanhassen Minnesota is hereby
amended to read as follows
Surface Water Management Fees SWMP Water Quality and Water Quantity
Development Type
Single Family
Duplex
School Church
Townhome
ApartmentHigh Density
Medium Density
Industrial
Commercial
Parks Open Space
Water Quality
2 360 00 Acre
2 640 00 Acre
4440 00 Acre
4 440 00 Acre
4 920 00 Acre
based on development type
13 680 00 Acre
17400 00 Acre
based on development type
Water Quantity
341O 00 Acre
based on land use designation
based on land use designation
based on land use designation
7 280 00 Acre
4 700 00 Acre
6 820 00 Acre
6 820 00 Acre
1 930 00 Acre
Fees are based on the developable land Undeveloped areas wetlands public parks and
existing development are exempt from the fees
Section 2 Section 4 30 c 5 of the City Code City of Chanhassen Minnesota is hereby
amended to read as follows
Sewer and Water Fees
Residential Development
Shall pay a sewer and water connection fee of 530 00 sewer and 1439 00 water at the time
of final subdivision approval
Sewer and Water Trunk Hook up Fees area trunk fees Fee is to be paid at time of building
permit Parcels previously assessed trunk hook up fees are exempt Residential trunk hook up
fees are based per unit
1
339
Sanitary Sewer 1 239 00 unit or 1 769 00 unit if the sewer connection fee has not been
paid at the time of final subdivision approval Lake Ann Interceptor
1 514 00 unit and Subtrunk 1 587 00 unit
3 360 00 unit or 4 799 00 if the water connection fee has not been paid
at the time of final subdivision approval
1 900 00 unit 1 825 00 to Metropolitan Council 75 00 city SAC
surcharge
Water
SAC
Parcels within the Lake Ann sewer district will be subject to the Lake Ann Trunk sewer fees in
addition to the sewer trunk hook up fees
Commercial Industrial and Institutional Development
Sewer and Water Trunk Hook up Fees area trunk fees Fee is paid at the time of building
permit Parcels previously assessed trunk hook up fees are exempt Trunk Hook up fees are
based on the number of Sanitary Access Charge SAC units assigned by Metropolitan Council
for office or Industrial Commercial buildings
Sanitary Sewer 1 769 00 unit Lake Ann Interceptor 1 514 00 unit and Subtrunk
1 587 00 unit
4 799 00 unit
1 900 00 unit 1 825 00 to Metropolitan Council 75 00 city SAC
surcharge
Water
SAC
Parcels within the Lake Ann sewer district will be subject to the Lake Ann Trunk sewer fees in
addition to the sewer trunk hook up fees
All Development
Lateral Connection Charges If the lot or tract of land or portion thereof to be served by a
lateral connection that has not been assessed for the cost of construction then the applicant shall
pay the following lateral connection
Sewer Lateral Connection Charge
Water Lateral Connection Charge
5 924 00
5 924 00
Section 3 Section 4 45 of the City Code City of Chanhassen Minnesota is hereby amended to
read as follows
Utility rates are established for each 1 000 gallons of usage
Water less than 25 000 gallons per quarter
25 000 to 50 000 gallons per quarter
amount greater than 50 000 gallons per quarter
minimum water charge per quarter
for amounts up to 5 000 gallons per quarter
1 81 per 1 000 gallons
226 per 1 000 gallons
2 62 per 1 000 gallons
9 00
2
340
Bulk sales to contractors landscapers etc at
City fill stations or other designated locations
4 50 per 1 000 gallons
Sewage residential based on winter quarter usage
commercial based on actual quarterly usage
minimum sewage charge per quarter
for amounts up to 5 000 gallons per quarter
343 per 1 000 gallons
343 per 1 000 gallons
17 50
Section 4 Section 4 50 of the City Code City of Chanhassen Minnesota is hereby amended to
read as follows
Surface Water Management Fees
Classification Land Use Utility Factor
1 Single family and Rural residential Not Applicable
2 Agricultural Not Applicable
3 Undeveloped Not Applicable
4 Medium density residential 222
5 High density residential Industrial Office Institutions 3 30
churches schools government buildings hospitals
6 Business Commercial 423
7 Parks cemeteries golf courses arboretum 046
8 Parking lots as a principal use 6 14
The surface water management fee for each tax parcel classified 1 2 and 3 shall be 8 11
The surface water management fee for each tax parcel classified 4 through 8 shall be calculated
as follows 15 83 multiplied by the utility factor multiplied by the acreage of the parcel
Section 5 This ordinance shall be effective January 1 2008 after its passage and publication
PASSED AND ADOPTED this 10th day of December 2007 by the City Council of the
City of Chanhassen Minnesota
Todd Gerhardt City Manager Thomas A Furlong Mayor
Published in the Chanhassen Villager on
g plan bg city codeamendment ordinance 2008 fees doc
3
341
Correspondence Packet
Memo from Laurie Hokkanen re Update on old St Hubert s Church dated December 5 2007
Letter from Government Finance Officers Association re Receiving a Certificate of
Achievement for Excellence in Financial Reporting dated November 14 2007
Letter from Mediacom re Changes to Cable System and Rates dated November 19 2007
Memo from Greg Sticha re Review of Claims Paid dated November 30 2007
342
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 2271160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952 227 1310
Senior Center
Phone 952227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
lmjn Seoh lYl
TO Todd Gerhardt City Manager
Laurie Hokkanen Assistant City Manager jJFROM
DATE December 5 2007
RE Update on Old St Hubert s Lease
The City has been leasing the Old St Hubert s building from St Hubert s
Catholic Community since 1978 for the amount of 1 per year The City
subleased the property to other churches at various points since then but the
building has been vacant since 2005
The Church was built in 1887 and remains on the original site today The
Church building was placed on the National Register of Historic Places in
1980 I
Through the lease the City assumed responsibility for the maintenance of the
building This has included major maintenance including a roof replacement
1990 cost of 35 000 and boiler replacement and repair The City did
receive some rent from Family of Christ but most of that was credited back to
them for repairs and maintenance that they performed Other costs that the
City has been responsible for are the parking lot easement approximately
1 200 a year general liability insurance and utilities The total amount paid
for utilities from 2005 present is 19473 00
The City does rent the Church out to interested parties for weddings concerts
etc In the past year there have been 4 rentals and approximately 8 tours
gIven
The City has approached St Hubert s at various times over lease and inquired
about their interest in terminating the lease To date there was not such
interest
The lease between the City and Old St Hubert s will expire on December 31
2008 There is no provision for further extension of the lease
A Historic Preservation effort and committee spearheaded by local residents
began in March 2007 My understanding is that they are exploring the
possibility of acquiring the church from St Hubert s and working possibly
with the Carver County Historical Society to preserve and operate the
Church The Committee has not made any requests to the City
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving bus inesses winding trails and beautiful parks A glBat place to live work and play343
G Government Finance Officers Association
203 N LaSalle Street Suite 2700
Chicago IL 60601
I AdM C C
Phone 312 977 9700 Fax 312 977 4806
November 15 2007
Todd Gerhardt
City Manager
City of Chanhassen
PO Box 147
Chanhassen MN 55317 0147
Dear Mr Gerhardt
We are pleased to notify you that your comprehensive annual financial report for the fiscal year ended December 31 2006
qualifies for a Certificate of Achievement for Excellence in Financial Reporting The Certificate of Achievement is the
highest form of recognition in governmental accounting and financial reporting and its attainment represents a significant
accomplishment by a government and its management
The Certificate ofAchievement plaque will be shipped to
Greg Sticha
Finance Director
under separate cover in about eight weeks We hope that you will arrange for a formal presentation of the Certificate and
Award ofFinancial Reporting Achievement and that appropriate publicity will be given to this notable achievement To
assist with this enclosed are a sample news release and the Certificate Program Results for reports with fiscal years
ended during 2005 representing the most recent statistics available
We hope that your example will encourage other government officials III their efforts to achieve and maintain an
appropriate standard of excellence in financial reporting
Sincerely
Government Finance Officers Association
jjLJ
Stephen 1 Gauthier Director
Technical Services Center
SJG ds
344
Phone 312 977 9700 Fax 312 977 4806
Government Finance Officers Association
203 N LaSalle Street Suite 2700
Chicago IL 60601
Chicago The Certificate of Achievement for Excellence in Financial Reporting has been
awarded to City of Chanhassen by the Government Finance Officers Association of the United
States and Canada GFOA for its comprehensive annual financial report CAFR The Certificate
of Achievement is the highest form of recognition in the area of governmental accounting and
financial reporting and its attainment represents a significant accomplishment by a government
and its management
An Award of Financial Reporting Achievement has been awarded to the individual s
department or agency designated by the government as primarily responsible for preparing the
award winning CAFR This has been presented to
Greg Sticha Finance Director
The CAFR has been judged by an impartial panel to meet the high standards of the program
including demonstrating a constructive spirit of full disclosure to clearly communicate its
financial story and motivate potential users and user groups to read the CAFR
The GFOA is a nonprofit professional association serving approximately 16 000 government
finance professionals with offices in Chicago IL and Washington D C
345
J f A1M t c C C
Mediacoml
Bill Jensen
Regional Vice President
Via Certified Mail RECEIVED
NOY 2 1 zo07November192007
r CP UJf Sr l
CITYyr r f n 1
City of Chanhassen
Todd Gerhardt City Manager
PO Box 147
Chanhassen MN 55317
Dear Chanhassen Community Official
The world oftelevision is changing and Mediacom is prepared to lead the way The Leichtman
Research Group recently announced that nearly 30 ofD S households own at least one high
definition television HDTV set This number is double the HDTV penetration ofjust two years ago
and will soar even higher following the upcoming holiday shopping season
Highdefinition products are the future oftelevision At Mediacom we are committed to offering our
customers the best HDTV options available in the marketplace So beginning in January 2008
Mediacom s HDTV channel lineup will undergo a major overhaul
The most significant change thatwewilhmdertake is the strengthening of our highdefinition channel
lineup which is available to our Family Cable subscribers We will begin by transitioning some very
popular high definition networks from the Mediacom HD Pak to our Family Cable Package Family
Cable will now include ESPN HD and ESPN2 HD which means Mediacom customers will no longer
be required to subscribe to the Mediacom HD Pak in order to receive these channels Also we plan on
announcing the addition of several other highdefinition channels to Family Cable in the coming
months All of this new content will be joined with the growing list of local broadcast stations that we
already offer in high definition as part ofthe Family Cable Package
In conjunction with the enhancements being made to Family Cable Mediacom on or about January 1st
2008 will be making the following rate adjustments to its cable services
Old Rate New Rate Increase
Broadcast Basic 19 95 20 95 1 00
Expanded Basic 32 00 34 00 2 00
Family Cable 51 95 54 95 3 00
Mediacom lID Pak 9 95 6 95 3 00
In order to view highdefinition channels on Family Cable or Commercial Family Cable Mediacom customers
will be required to lease an HD converter box or cable card from Mediacom and have a highdefinition television
set
Mediacom Communications Corporation
1504 2ND Street SE Waseca Minnesota 56093
Telephone 507 835 2356 Fax 507 835 4567
E mail bjensen@mediacomcc com
346
age Two Community HDTV Letter
November 16 2007
The rates for all of our other products and services will remain the same These new rates will not be
applicable to customers currently on promotional offers until such e as their promotions expire
We re working hard to remain the 1 source for cable television high speed Internet and phone service
in your community Even though Mediacom is continually faced with rising programming and
operating costs we believe our customers are getting more value for their cable dollar than ever before
Especially those customers taking advantage of the discounted pricing available when our cable service
is bundled with our high speed Internet and phone services
In closing let me emphasize how much we appreciate the opportunity to serve your community If you
have any questions please contact me directly at 507 8374860 or via email at
bjensen@mediacomcc com
Sincerely
347
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952227 1170
Finance
Phone 952227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
MEMORANDUM
TO Mayor
City Council
FROM Greg Sticha Finance Director G 7
ODATENovember302007
SUBJECT Review of Claims Paid
The following claims are submitted for review on December 10 2007
Check Numbers Amounts
134850 134966 450 10055
November Visa charges 12 22844
Total All Claims 462 328 99
Attachments Check Summary
Check Detail Report
Visa Listing
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play348
CITY OF CHANHASSEN Accounts Payable Printed 1130 2007 14 53
User danielle Checks by Date Summary by Check Number Summary
Check Number Vendor No Vendor Name Check Date Void Amount Check Amount
134850 AltBus Alternative Business Furniture Il 212007 0 00 37541
134851 BarEng Barr Engineering Company Il 212007 0 00 3 944 58
134852 BCATRA BCA TRAINING DEVELOPMENT Il 212007 0 00 60 00
134853 BORSTA BORDER STATES ELECTRIC SUPPLY 11212007 0 00 92 86
134854 BRAINT BRAUN INTERTEC CORPORATION 11212007 0 00 2 682 50
134855 del den Delta Dental 11212007 0 00 1 471 65
134856 DYNAME DYNAMEX DELIVERS NOW 11212007 0 00 90 89
134857 EMEAPP EMERGENCY APPARATUS MAINT INC 11212007 0 00 1 110 00
134858 EMEAUT EMERGENCY AUTOMOTIVE TECH INYOID 11212007 62 20 0 00
134859 engwat Engel Water Testing Inc 11212007 0 00 350 00
134860 facmot FACTORY MOTOR PARTS COMPANY 11212007 0 00 92 22
134861 FASCOM FASTENAL COMPANY 11212007 0 00 127 25
134862 FIREQU FIRE EQUIPMENT SPECIALITIES 11212007 0 00 1 957 95
134863 firlab FIRSTLAB 11212007 0 00 78 00
134864 FURLTHOM THOMAS FURLONG 11 212007 0 00 89 96
134865 HANTHO HANSEN THORP PELLINEN OLSON Il 212007 0 00 2 126 50
134866 HA WCHE HAWKINS CHEMICAL 11212007 0 00 55 00
134867 HDsup HD Supply Waterworks LTD 11212007 0 00 5 056 28
134868 ICMART ICMA RETIREMENT AND TRUST 457 11212007 0 00 1 915 00
134869 justmark Mark Justesen 11212007 0 00 10 00
134870 KEOGJEFF JEFF KEOGH 11212007 0 00 140 00
134871 kilele KILLMER ELECTRIC CO INC 11212007 0 00 2 072 74
134872 KOCHNICO NICOLE KOCHAR 11212007 0 00 442 00
134873 MACEQU MACQUEEN EQUIPMENT 11212007 0 00 800 69
134874 MEMA METROPOLITAN EMERGENCY MANAGER 11212007 0 00 30 00
134875 MIDASP MIDWEST ASPHALT CORPORATION 11212007 0 00 358 25
134876 MINCON MINNESOTA CONWAY 11212007 0 00 40 33
134877 MNCHIL MN CHILD SUPPORT PAYMENT CTR 11212007 0 00 501 15
134878 MNHEAL MN DEPT OF HEALTH 11212007 0 00 11 916 00
134879 MNLIFE MINNESOTA LIFE VOID 11212007 1 467 80 0 00
134880 MNMar MN State Fire Marshal 11212007 0 00 70 00
134881 MNNAT MN DEPT OF NATURAL RESOURCES 1121 2007 0 00 120 00
134882 MSRS MSRS j 1 212007 0 00 2 403 20
134883 rnxlog MX Logic 11212007 0 00 97 00
134884 NA TRET NATIONWIDE RETIREMENT SOLUTION 11 212007 0 00 5 077 09
134885 nelsju1i Julie Nelson 11212007 0 00 1 400 00
134886 nobsea NOBLE SEASONAL LIGHTING 11212007 0 00 1 665 66
134887 oehmpaul PAUL OEHME 11212007 0 00 30 07
134888 onvoy ONVOY 11212007 0 00 1 028 50
134889 PATCO PATRICK CO 11212007 0 00 346 13
134890 PHIMED PHILIPS MEDICAL SYSTEMS 11212007 0 00 1 403 25
134891 POWCHA POWER SYSTEMS 11212007 0 00 25062
134892 quiljane Jane Quilling Revsbech Il 212007 0 00 25 00
134893 reebus REED CONSTRUCTION DATA 11212007 0 00 258 68
134894 re off Reliable Office Supplies 11212007 0 00 166 90
134895 schson SCHARBER SONS INC 11212007 0 00 1 939 03
134896 sensys SENTRY SYSTEMS INC 11212007 0 00 5172
134897 SIGNSU SIGNS N SUCH 11212007 0 00 18 00
134898 sobotim Tim Soboleski 11212007 0 00 250 00
134899 SOFHOU SOFTWARE HOUSE INTERNATIONAL 11212007 0 00 11 78955
134900 SOUSTP SOUTH ST PAUL STEEL SUPPLY CO 11212007 0 00 1 030 67
134901 Spring Springbrook 11212007 0 00 1 071 05
134902 SUNRAM SUNRAM CONSTRUCTION 11 212007 0 00 54487 82
134903 TBEI TBEI LLC 11212007 0 00 3 407 95
134904 TOLGAS TOLL GAS WELDING SUPPLY 11212007 0 00 60 82
134905 TWIGAR TWIN CITY GARAGE DOOR CO 11212007 0 00 850 00
134906 TWIWES TWIN CITIES WESTERN RR CO 11212007 0 00 1 000 00
134907 UNIMIN UNIVERSITY OF MINNESOTA 11212007 0 00 170 00
134908 UNIWA Y UNITED WAY 1121 2007 0 00 42 00
134909 usablu USA BLUE BOOK 11212007 0 00 31 35
134910 V ALRIC VALLEY RICH CO INC 11212007 0 00 274 92
134911 VERIZO VERIZON WIRELESS 11212007 0 00 6 13
Page 1
349
CITY OF CHANHASSEN Accounts Payable Printed 1130 2007 14 53
User danielle Checks by Date Summary by Check Number Summary
Check Number Vendor No Vendor Name Check Date Void Amount Check Amount
134912 waytek WAYTEK INC 11212007 0 00 33112
134913 weides Weissman s Designs for Dance 11212007 0 00 7 528 68
134914 WELLMARI MARIANNE WELLS 11212007 0 00 1 166 00
134915 wmmue WM MUELLER SONS INC 11212007 0 00 28 110 88
134916 xceI XCEL ENERGY INC 11212007 0 00 2 136 59
134917 ZIEGLE ZIEGLER INC 11212007 0 00 67843
134918 MNLIFE MINNESOTA LIFE 11212007 0 00 1 467 80
134919 aholerin Erin Ahola 1129 2007 0 00 7200
134920 amefor AMERICAN FORESTS 1129 2007 0 00 25 00
134921 anctec ANCOM TECHNICAL CENTER 1129 2007 0 00 12 00
134922 ASBENE ASSURANT EMPLOYEE BENEFITS 1129 2007 0 00 1 244 64
134923 BCATRA BCA TRAINING DEVELOPMENT 1129 2007 0 00 45 00
134924 CEMPRO CEMSTONEPRODUCTSCO 1129 2007 0 00 33 02
134925 CLEW A T CLEARS OFT WATER CONDITIONING 1129 2007 0 00 139 95
134926 CONRES CONTINENTAL RESEARCH CORP 1129 2007 0 00 106 87
134927 corexp CORPORATE EXPRESS 1129 2007 0 00 17 70
134928 crebui Creekwood Builders LLC 1129 2007 0 00 1 000 00
134929 danka DANKA OFFICE IMAGING COMPANY 11 29 2007 0 00 210 82
134930 deItoo DELEGARD TOOL COMPANY 11 29 2007 0 00 4 110 00
134931 DONSOD DON S SOD SERVICE 1129 2007 0 00 4 485 16
134932 doysec DOYLE SECURITY PRODUCTS 1129 2007 0 00 1 140 06
134933 EHLERS EHLERS ASSOCIATES INC 1129 2007 0 00 1 755 00
134934 GOLVAL Golden Valley Land Company 1129 2007 0 00 826 00
134935 HANTHO HANSEN THORP PELLINEN OLSON 1129 2007 0 00 1 877 25
134936 HARCRE HARDWOOD CREEK LUMBER INC 1129 2007 0 00 431 94
134937 INFRA T INFRATECH 1129 2007 0 00 1 324 22
134938 johncaro Carole Johnson 1129 2007 0 00 119 00
134939 jrohs J Rohs Homes Inc 1129 2007 0 00 500 00
134940 katfue KATH FUEL OIL SERVICE 1129 2007 0 00 1 032 65
134941 KOEPMATTMatthew Koeppen I 1 29 2007 0 00 1 750 00
134942 LLOCON LLOYDS CONSTRUCTION SERVICES 1129 2007 0 00 78 00
134943 lunbro LUNDGREN BROS CONSTRUCTION 1129 2007 0 00 1 750 00
134944 mettes Metro Testing 1129 2007 0 00 29 94
134945 MTIDIS MTI DISTRIBUTING INC 1129 2007 0 00 451 60
134946 neabro Neaton Brothers Erosion LLC 1129 2007 0 00 740 95
134947 nelsjim Jim Nelson 1129 2007 0 00 100 00
134948 nobsea NOBLE SEASONAL LIGHTING 1129 2007 0 00 98 35
134949 NyeAnn Ann Nye 1129 2007 0 00 406 07
134950 nyspub NYSTROM PUBLISHING COMPANY INC 1129 2007 0 00 5 136 00
134951 patmes PATCHIN MESSNER DODD 1129 2007 0 00 1 556 25
134952 guiII QUILL CORPORATION 1129 2007 0 00 72 13
134953 reloff Reliable Office Supplies 11 292007 0 00 43 96
134954 ryacon Ryan Contracting Company 1129 2007 0 00 216 216 20
134955 SEH SEH 1129 2007 0 00 3 905 78
134956 SieBui Siemens Building Technologies 1129 2007 0 00 640 00
134957 siegchar CHARLES SIEGLE 1129 2007 0 00 202 93
134958 SIGNSU SIGNS N SUCH 1129 2007 0 00 77 82
134959 SNATOO SNAP ON TOOLS 1 1 29 2007 0 00 613 15
134960 steman STEPP MANUFACTURING 11 29 2007 0 00 297 16
134961 target TARGET 1129 2007 0 00 2549
134962 VESSCO VESSCO INC 1129 2007 0 00 1 719 88
134963 WACFAR WACONIA FARM SUPPLY 1129 2007 0 00 21 664 37
134964 wilnur WILSON S NURSERY INC 1129 2007 0 00 360 91
134965 WMMUE WM MUELLER SONS INC 11 29 2007 0 00 64743
134966 post POSTMASTER 1130 2007 0 00 778 08
Report Total 1 530 00 450 100 55
Page 2
350
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
Ahola Erin
aholerin Ahola Erin
Ck 134919 1129 07
Inv 2000808 002
Line Item Date Line Item Description
1128 07 Refund Dance Kinder 2
Inv 2000808 002 Total
Line Item Account
101 1534 3631 7200
72 00
Ck 134919 Total 72 00
aholerin Ahola Erin 72 00
Ahola Erin 72 00
Alternative Business Furniture
AltBus Alternative Business Furniture
Ck 134850 112107
Inv 29477
Line Item Date
11 12 07
Inv 29477 Total
Line Item Description
T Jeffery s Office overhead drawer
Line Item Account
101 1170 4300 37541
37541
Ck 134850 Total 37541
AltBus Alternative Business Furniture 37541
Alternative Business Furniture 375 41
AMERICAN FORESTS
amefor AMERICAN FORESTS
Ck 134920 1129 07
Inv 11282007
Line Item Date Line Item Description
1128 07 Forest Membership
Inv 11282007 Total
Line Item Account
720 7202 4360 25 00
25 00
Ck 134920 Total 25 00
amefor AMERICAN FORESTS 25 00
AMERICAN FORESTS 25 00
ANCOM TECHNICAL CENTER
anctec ANCOM TECHNICAL CENTER
Ck 134921 1129 07
Inv 75758
Line Item Date
112107
Inv 75758 Total
Line Item Description
Minitor IV
Line Item Account
101 1220 4531 12 00
12 00
Ck 134921 Total 12 00
anctec ANCOM TECHNICAL CENTER 12 00
ANCOM TECHNICAL CENTER 12 00
Page 1
351
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130107 14 54
Amount
ASSURANT EMPLOYEE BENEFITS
ASBENE ASSURANT EMPLOYEE BENEFITS
Ck 134922 1129107
Inv Dec07
Line Item Date
1128 07
1128 07
1128 07
1128 07
11 28 07
Inv Dec07 Total
Line Item Description
Long Term Disability December 07
Long Term Disability December 07
Long Term Disability December 07
Long Term Disability December 07
Long Term Disability December 07
Line Item Account
210 0000 20 IS
720 0000 20 IS
701 0000 2015
700 0000 2015
101 0000 2015
19 95
49 25
77 84
93 59
1 004 01
1 244 64
Ck 134922 Total 1 244 64
ASBENE ASSURANT EMPLOYEE BENEFITS 1 244 64
ASSURANT EMPLOYEE BENEFITS 1 244 64
Barr Engineering Company
BarEng Barr Engineering Company
Ck 134851 112107
Inv 23100951
Line Item Date
1105107
1105107
Inv 23100951
Line Item Description
Chan Wells 13
Chan Wells 12
Total
Line Item Account
700 7023 4300
700 7022 4300
1 972 29
1 972 29
3 944 58
Ck 134851 Total 3 944 58
BarEng Barr Engineering Company 3 944 58
Barr Engineering Company 3 944 58
BCA TRAINING DEVELOPMENT
BCA TRA BCA TRAINING DEVELOPMENT
Ck 134852 112107
Inv 11202007
Line Item Date Line Item Description
1120107 Criminal Background investigation
Inv 11202007 Total
Line Item Account
101 1120 4300 60 00
60 00
Ck 134852 Total 60 00
Ck 134923 1129107
Inv 11282007
Line Item Date Line Item Description
1128 07 Criminal Background Investigation 3
Inv 11282007 Total
Line Item Account
101 1120 4300 45 00
45 00
Ck 134923 Total 45 00
BCATRA BCA TRAINING DEVELOPMENT 105 00
BCA TRAINING DEVELOPMENT 105 00
Page 2
352
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
BORDER STATES ELECTRIC SUPPLY
BORSTA BORDER STATES ELECTRIC SUPPLY
Ck 134853 112107
Inv 97192492
Line Item Date Line Item Description
1106 07 handybox octron flr 1m
Inv 97192492 Total
Line Item Account
101 1190 4510 92 86
92 86
Ck 134853 Total 92 86
BORSTA BORDER STATES ELECTRIC SUPPLY 92 86
BORDER STATES ELECTRIC SUPPLY 92 86
BRAUN INTERTEC CORPORATION
BRAINT BRAUN INTERTEC CORPORATION
Ck 134854 112107
Inv 286391
Line Item Date
1108 07
Inv 286391 Total
Line Item Description
Well No 13 Lake Drive Project fee
Line Item Account
700 7023 4300 1 102 75
1 102 75
Inv 286988
Line Item Date
11 13 07
Inv 286988 Total
Line Item Description
Dogwood Road Improve Soil Obs test
Line Item Account
601 6015 4300 1 579 75
1 579 75
Ck 134854 Total 2 68250
braint BRAUN INTERTEC CORPORATION 2 682 50
BRAUN INTERTEC CORPORATION 2 682 50
CEMSTONE PRODUCTS CO
CEMPRO CEMSTONE PRODUCTS CO
Ck 134924 1129 07
Inv 1146113
Line Item Date Line Item Description
11 16 07 Thoacryl quikrete5000
Inv 1146113 Total
Line Item Account
101 1320 4540 33 02
33 02
Ck 134924 Total 33 02
CEMPRO CEMSTONE PRODUCTS CO 33 02
CEMSTONEPRODUCTSCO 33 02
CLEARSOFT WATER CONDITIONING
CLEWAT CLEARSOFT WATER CONDITIONING
Ck 134925 1129 07
Inv 11082007
Line Item Date Line Item Description
1128 07 Chanhassen Library
Inv 11082007 Total
Line Item Account
101 1190 4530 139 95
139 95
Ck 134925 Total 139 95
Page 3
353
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
CLEWAT CLEARS OFT WATER CONDITIONING
Amount
139 95
CLEARS OFT WATER CONDITIONING 139 95
CONTINENTAL RESEARCH CORP
CONRES CONTINENTAL RESEARCH CORP
Ck 134926 1129 07
Iny 282752DCTl
Line Item Date
1116 07
1116 07
1116 07
1116 07
Iny 282752DCTI
Line Item Description
Strong Arm Per Adhsy Seal
Strong Arm Per Adhsy Seal
Strong Arm Per Adhsy Seal
Strong Arm Per Adhsy Seal
Total
Line Item Account
101 1320 4150
700 0000 4150
101 1550 4150
101 1370 4150
26 71
26 72
26 72
26 72
106 87
Ck 134926 Total 106 87
CONRES CONTINENTAL RESEARCH CORP 106 87
CONTINENTAL RESEARCH CORP 106 87
CORPORATE EXPRESS
corexp CORPORATE EXPRESS Account 101 1170 4110
Ck 134927 1129 07
Iny 82778226
Line Item Date Line Item Description
110107 Returned Item Ord 170 171 054 002
Iny 82778226 Total
corexp CORPORATE EXPRESS
Line Item Account
101 1170 4110 4 97
4 97
Line Item Account
101 1170 4110 48 97
48 97
Line Item Account
101 1170 4110 4243
4243
Line Item Account
101 1170 4110 29 21
29 21
17 70
17 70
17 70
Iny 82778242
Line Item Date Line Item Description
110107 Returned Item Ord 170534930 003
Iny 82778242 Total
InY 83053151
Line Item Date Line Item Description
1113 07 Uniball Pens
Iny 83053151 Total
InY 83158205
Line Item Date Line Item Description
11 16 07 Astro 65 TGN 5 CLR Ast
Iny 83158205 Total
Ck 134927 Total
CORPORATE EXPRESS
Creekwood Builders LLC
crebui Creekwood Builders LLC
Ck 134928 1129 07
Iny 11212007
Line Item Date Line Item Description
1128 07 Erosion Escrow 30 Hill Street
Iny 11212007 Total
Line Item Account
815 8202 2024 1 000 00
1 000 00
Page 4
354
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Ck 134928 Total
Amount
1 000 00
crebui Creekwood Builders LLC 1 000 00
Creekwood Builders LLC 1 000 00
DANKA OFFICE IMAGING COMPANY
danka DANKA OFFICE IMAGING COMPANY
Ck 134929 1129 07
InY 402040412
Line Item Date Line Item Description
1114 07 Canon Refill HI Staples
InY 402040412 Total
Line Item Account
101 1170 4110 210 82
210 82
Ck 134929 Total 210 82
danka DANKA OFFICE IMAGING COMPANY 210 82
DANKA OFFICE IMAGING COMPANY 210 82
DELEGARD TOOL COMPANY
deltoo DELEGARD TOOL COMPANY
Ck 134930 1129 07
Iny 67560
Line Item Date
1109 07
Iny 67560 Total
Line Item Description
press plate protective kit
Line Item Account
101 1370 4705 4 011 23
4 011 23
InY 68838
Line Item Date
1114 07
Iny 68838 Total
Line Item Description
xpert scrdrvr 6pc set 12 locking plier
Line Item Account
101 1370 4260 98 77
98 77
Ck 134930 Total 4 110 00
deltoo DELEGARD TOOL COMPANY 4 110 00
DELEGARD TOOL COMPANY 4 110 00
Delta Dental
delden Delta Dental
Ck 134855 112107
Iny 3990627
Line Item Date Line Item Description
1115 07 Dental Insurance Prem Dec 2007
1115 07 Dental Insurance Prem Dec 2007
1115 07 Dental Insurance Prem Dec 2007
1115 07 Dental Insurance Prem Dec 2007
1115 07 Dental Insurance Prem Dec 2007
Iny 3990627 Total
Line Item Account
210 0000 2013
701 0000 2013
700 0000 2013
720 0000 2013
101 0000 2013
6 06
11845
142 70
204 03
1 00041
1 471 65
Ck 134855 Total 1 471 65
del den Delta Dental 1 471 65
Delta Dental 1 471 65
Page 5
355
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed I I30 07 14 54
Amount
DON S SOD SERVICE
DON SOD DON S SOD SERVICE
Ck 134931 1 I29 07
Inv 11172007
Line Item Date Line Item Description
1 I28 07 Lake Ann Ballfield
Inv 11172007 Total
Line Item Account
101 1550 4150 4 485 16
4 485 16
Ck 134931 Total 4 485 16
DONSOD DON S SOD SERVICE 4 485 16
DON S SOD SERVICE 4 485 16
DOYLE SECURITY PRODUCTS
doysec DOYLE SECURITY PRODUCTS
Ck 134932 1 I29 07
Inv 705979
Line Item Date
1116 07
Inv 705979 Total
Line Item Description
passage lever spring torsion RH LH
Line Item Account
101 1170 4510 23547
235 47
Inv 705980
Line Item Date
1116 07
Inv 705980 Total
Line Item Description
pro keypad access control
Line Item Account
101 1170 4510 904 59
90459
Ck 134932 Total 1 140 06
DOYSEC DOYLE SECURITY PRODUCTS 1 140 06
DOYLE SECURITY PRODUCTS 1 140 06
DYNAMEX DELIVERS NOW
DYNAME DYNAMEX DELIVERS NOW
Ck 134856 1 I2I 07
Inv 1314764
Line Item Date Line Item Description
10 25 07 Job PickUp 10 22 07
Inv 1314764 Total
Line Item Account
700 0000 4330 53 67
53 67
Inv 1317471
Line Item Date Line Item Description
1 I08 07 Pick Up
Inv 1317471 Total
Line Item Account
700 0000 4330 37 22
37 22
Ck 134856 Total 90 89
DYNAME DYNAMEX DELIVERS NOW 90 89
DYNAMEX DELIVERS NOW 90 89
EHLERS ASSOCIATES INC
EHLERS EHLERS ASSOCIATES INC
Ck 134933 1129 07
Inv 336145
Line Item Date
1 I27 07
Line Item Description
Continuing Disclosure Reporting
Line Item Account
300 0000 4300 1 755 00
Page 6
356
CITY OF CHANHAS
User danielle
Inv 336145 Total
Ck 134933 Total
EHLERS
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
1 755 00
1 755 00
EHLERS ASSOCIATES INC
EHLERS ASSOCIATES INC
1 755 00
1 755 00
EMERGENCY APPARATUS MAINT INC
EMEAPP EMERGENCY APPARATUS MAINT INC
Ck 134857 112107
Inv 32897
Line Item Date
I 1 09 07
Inv 32897 Total
Inv 32898
Line Item Date
I 1 09 07
Inv 32898 Total
Inv 32899
Line Item Date
I 1 09 07
Inv 32899 Total
Inv 32901
Line Item Date
I 1 09 07
Inv 3290 I Total
Ck 134857 Total
EMEAPP
Line Item Description
NFP A Pump Test Engine 2 I0
Line Item Description
NFP A Pump Test Engine 2 I I
Line Item Description
NFPA Pump Test Engine 212
Line Item Description
Ladder 228 Pump Test
Line Item Account
101 1220 4520 315 00
315 00
Line Item Account
101 1220 4520 265 00
265 00
Line Item Account
101 1220 4520 265 00
265 00
Line Item Account
101 1220 4520 265 00
265 00
1 110 00
EMERGENCY APPARATUS MAINT INC
EMERGENCY APPARATUS MAINT INC 1 110 00
Engel Water Testing Ine
engwat Engel Water Testing Ine
Ck 134859 I 1 2107
Inv 074419
Line Item Date
10 26 07
Inv 074419 Total
Ck 134859 Total
engwat
Engel Water Testing Ine
Line Item Description
Water Samples 10 23 10 25
Engel Water Testing Ine
FACTORY MOTOR PARTS COMPANY
faemot FACTORY MOTOR PARTS COMPANY
Ck 134860 I 1 2107
Inv 6989752
Line Item Date
1119 07
Line Item Description
pre batt pp60 un279
1 110 00
Line Item Account
700 0000 4300 350 00
350 00
350 00
350 00
350 00
Line Item Account
700 0000 4 I 40 92 22
Page 7
357
CITY OF CHANHAS
User danielle
Iny 6989752 Total
Ck 134860 Total
facmot
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
92 22
92 22
FACTORY MOTOR PARTS COMPANY
92 22FACTORYMOTORPARTSCOMPANY
FASTENAL COMPANY
FASCOM FASTENAL COMPANY
Ck 134861 112107
Iny MNTl00373
Line Item Date Line Item Description
1120 07 HXLG iny MNT1014125
Iny MNT100373 Total
Iny MNTI017089
Line Item Date Line Item Description
10 24 07 HCS SAE Thru Hard 1 14P
Iny MNTI 017089 Total
Inv MNT1017109
Line Item Date Line Item Description
10 25 07 FNL Hole Saw Hole saw 2 1 4
Iny MNTI017109 Total
Iny MNT1017180
Line Item Date Line Item Description
10 3107 H CS
Iny MNTI 0 17180 Total
Ck 134861 Total
FASCOM FASTENAL COMPANY
FASTENAL COMPANY
FIRE EQUIPMENT SPECIALITIES
FIREQU FIRE EQUIPMENT SPECIALITIES
Ck 134862 112107
Iny 5367
Line Item Date
1113 07
Iny 5367 Total
Line Item Description
Bourke Eye Shield
Ck 134862 Total
FIREQU
92 22
Line Item Account
700 0000 4120 5 86
5 86
Line Item Account
101 1320 4120 68 69
68 69
Line Item Account
101 1370 4260 2919
29 19
Line Item Account
10 1 1320 4120 35 23
35 23
127 25
127 25
127 25
Line Item Account
400 4105 4705 1 957 95
1 957 95
1 957 95
FIRE EQUIPMENT SPECIALITIES
1 957 95FIREEQUIPMENTSPECIALITIES
FIRSTLAB
firlab FIRSTLAB
Ck 134863 112107
Iny 261937
Line Item Date
1108 07
Line Item Description
DOT Drug Screen Random
1 957 95
Line Item Account
101 1320 4300 78 00
Page 8
358
CJTY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Jnv 261937 Total
Amount
78 00
Ck 134863 Total 78 00
firlab FIRSTLAB 78 00
FIRSTLAB 78 00
FURLONG THOMAS
FURLTHOM FURLONG THOMAS
Ck 134864 112107
Jnv 11202007
Line Item Date Line Item Description
1120 07 Mayors Summit 118 11 11
Jnv 11202007 Total
Line Item Account
101 1110 4370 89 96
89 96
Ck 134864 Total 89 96
FURLTHOM FURLONG THOMAS 89 96
FURLONG THOMAS 89 96
Golden Valley Land Company
GOLV AL Golden Valley Land Company
Ck 134934 1129 07
Jnv 11282007
Line Item Date Line Item Description
1128 07 Sign Rent Refund Pleasant Hills 2nd Add
1128 07 Use Variance Refund Pleasant Hills 2nd
1128 07 Recording Fee Refund Pleasant Hills 2nd
Jnv 11282007 Total
Line Item Account
400 0000 3809
101 1420 3602
101 1420 3605
200 00
300 00
326 00
826 00
Ck 134934 Total 826 00
GOLVAL Golden Valley Land Company 826 00
Golden Valley Land Company 826 00
HANSEN THORP PELLINEN OLSON
HANTHO HANSEN THORP PELLINEN OLSON
Ck 134865 112107
Jnv 16741
Line Item Date
1108 07
Jnv 16741 Total
Line Item Description
Lake Riley Woods Prof Services
Line Item Account
720 0000 4300 2 126 50
2 12650
Ck 134865 Total 2 126 50
Ck 134935
Jnv 16703
Line Item Date
1107 07
Jnv 16703 Total
112907
Line Item Description
Lake Ann Pic Shlter Ballfield Lhtg OCT
Line Item Account
410 0000 4300 1 877 25
1 877 25
Ck 134935 Total 1 877 25
HANTHO HANSEN THORP PELLINEN OLSON 4 003 75
Page 9
359
CJTY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
HANSEN THORP PELLINEN OLSON
Amount
4 003 75
HARDWOOD CREEK LUMBER INC
HARCRE HARDWOOD CREEK LUMBER INC
Ck 134936 1129 07
Jny 7603
Line Item Date Line Item Description
112107 48 Pine Lath
Jny 7603 Total
Line Item Account
101 1550 4120 431 94
43 I 94
Ck 134936 Total 431 94
HARCRE HARDWOOD CREEK LUMBER INC 431 94
HARDWOOD CREEK LUMBER INC 431 94
HAWKINS CHEMICAL
HA WCHE HAWKINS CHEMICAL
Ck 134866 112107
JnY 1128731RJ
Line Item Date Line Item Description
10 3 1 07 chlorine cylinders
Jny 1128731RJ Total
Line Item Account
700 7019 4160 55 00
55 00
Ck 134866 Total 55 00
HA WCHE HAWKINS CHEMICAL 55 00
HAWKINS CHEMICAL 55 00
HD Supply Waterworks L TD
HDsup HD Supply Waterworks L TD
Ck 134867 I 1 2107
JnY 6331735
Line Item Date Line Item Description
1109 07 yalve seal yly rbr cotter pin gasket
Jny 633 I 735 Total
Line Item Account
700 0000 4550 1 258 47
1 25847
Jny 6356987
Line Jtem Date Line Item Description
11 14 07 30 hyd bronze crossarm
Jny 6356987 Total
Line Item Account
700 0000 4550 44153
44153
JnY 6361924
Line Item Date Line Item Description
1115 07 510 R WU notpit rnxu single port wired un
Jny 636 I 924 Total
Line Item Account
700 0000 4250 3 135 51
3 1355 I
Jny 6361941
Line Item Date Line Jtem Description
1115 07 mech hose nozel
JnY 6361941 Total
Line Item Account
700 0000 4 I 20 220 77
220 77
Ck 134867 Total 5 056 28
HDsup HD Supply Waterworks L TD 5 056 28
Page 10
360
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
HD Supply Waterworks L TD
Amount
5 056 28
ICMA RETIREMENT AND TRUST 457
ICMART ICMA RETIREMENT AND TRUST 457
Ck 134868 112107
Iny
Line Item Date
1119 07
11 19 07
1119 07
Iny Total
Line Item Description
PR Batch 421 11 20071CMA
PR Batch 421 11 20071CMA
PR Batch 421 11 20071CMA
Line Item Account
210 0000 2009
720 0000 2009
10 1 0000 2009
31 25
100 00
1 783 75
1 915 00
Ck 134868 Total 1 915 00
ICMART ICMA RETIREMENT AND TRUST 457 1 915 00
ICMA RETIREMENT AND TRUST 457 1 915 00
INFRA TECH
IN FRAT INFRATECH
Ck 134937 1l29 07
Iny PR71107
Line Item Date Line Item Description
10 24 07 MH Grouting at Cascade Circle
Iny PR71107 Total
Line Item Account
701 0000 4553 1 324 22
1 324 22
Ck 134937 Total 1 324 22
INFRA T INFRA TECH 1 324 22
INFRA TECH 1 324 22
J Rohs Homes Ine
jrohs J Rohs Homes Ine
Ck 134939 1129 07
Iny 11262007
Line Item Date Line Item Description
1128 07 Erosion Escrow 9905 Trails End Road
Iny 11262007 Total
Line Item Account
815 8202 2024 500 00
500 00
Ck 134939 Total 500 00
jrohs J Rohs Homes Ine 500 00
J Rohs Homes Ine 500 00
Johnson Carole
johnearo Johnson Carole
Ck 134938 1129 07
Iny 11282007
Line Item Date Line Item Description
11 28 07 Notary Filing Stamp
1128 07 Notary Filing Stamp
1128 07 Notary Filing Stamp
1128 07 Notary Filing Stamp
Iny 11282007 Total
Line Item Account
101 1520 4440
101 1320 4440
101 1370 4440
700 0000 4440
29 75
29 75
29 75
29 75
119 00
Ck 134938 Total 119 00
Page 11
361
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
johncaro Johnson Carole
Amount
119 00
Johnson Carole 119 00
Justesen Mark
justmark Justesen Mark
Ck 134869 112107
1ny 103107
Line Item Date
10 3107
Iny 103107 Total
Line Item Description
lunch at NW B1dg Insp Meeting I 017
Line Item Account
101 1250 4370 1000
1000
Ck 134869 Total 10 00
justmark Justesen Mark 10 00
Justesen Mark 10 00
KA TH FUEL OIL SERVICE
katfue KA TH FUEL OIL SERVICE
Ck 134940 1129 07
Iny 199466
Line Item Date
1119 07
Iny 199466 Total
Line Item Description
oil master citgo citgard 55g drum fee
Line Item Account
101 1370 4170 1 032 65
1 032 65
Ck 134940 Total 1 032 65
katfue KA TH FUEL OIL SERVICE 1 032 65
KA TH FUEL OIL SERVICE 1 032 65
KEOGH JEFF
KEOGJEFF KEOGH JEFF
Ck 134870 11 2107
Iny 11202007
Line Item Date Line Item Description
1120 07 Inspector Meeting
1120 07 MN Dept Labor Ind Plumbing License
Iny 11202007 Total
Line Item Account
101 1250 4370
101 1250 4360
20 00
120 00
140 00
Ck 134870 Total 140 00
KEOGJEFF KEOGH JEFF 140 00
KEOGH JEFF 140 00
KILLMER ELECTRIC CO INC
kilele KILLMER ELECTRIC CO INC
Ck 134871 112107
InY 65151
Line Item Date
10 3107
InY 65151 Total
Line Item Description
ITE 60 Amp journeyman
Line Item Account
101 1350 4565 203 10
203 10
Iny 65152
Line Item Date
10 3107
Line Item Description
fuse holder wirenuts tape
Line Item Account
101 1350 4565 208 02
Page 12
362
CITY OF CHANHAS
User danieIle
Accounts Payable
Check Detail Report Detail
Printed 11 30 07 14 54
Inv 65152 Total
Amount
208 02
Inv 65 I 53
Line Item Date
10 3 1 07
Inv 65153 Total
Line Item Description
fuse fuseholder wirenuts tape wire
Line Item Account
101 1350 4565 1 661 62
1 661 62
Ck 134871 Total 2 072 74
kilele KILLMER ELECTRIC CO INC 2 072 74
KILLMER ELECTRIC CO INC 2 072 74
KOCHAR NICOLE
KOCHNICO KOCHAR NICOLE
Ck 134872 1 12107
Inv 11202007
Line Item Date Line Item Description
I 1 20 07 Dance Program Supplies
Inv 11202007 Total
Line Item Account
10 I 1534 4130 442 00
442 00
Ck 134872 Total 442 00
KOCHNICO KOCHAR NICOLE 442 00
KOCHAR NICOLE 442 00
Koeppen Matthew
KOEPMATT Koeppen Matthew
Ck 134941 11 29 07
Inv I 1262007
Line Item Date Line Item Description
1128 07 Landscape Escrow 5 I 6 Big Woods Blvd
1128 07 Erosion Escrow 516 Big Woods Blvd
Inv I 1262007 Total
Line Item Account
8 I 5 820 I 2024
8 I 5 8202 2024
750 00
1 000 00
1 750 00
Ck 134941 Total 1 750 00
KOEPMATT Koeppen Matthew 1 750 00
Koeppen Matthew 1 750 00
LLOYDS CONSTRUCTION SERVICES
LLOCON LLOYDS CONSTRUCTION SERVICES
Ck 134942 I 1 29 07
Inv 0524995 IN
Line Item Date Line Item Description
1116 07 Tipping Fee transfer station
Inv 0524995 IN Total
Line Item Account
101 1550 4350 78 00
78 00
Ck 134942 Total 78 00
LLOCON LLOYDS CONSTRUCTION SERVICES 78 00
LLOYDS CONSTRUCTION SERVICES 78 00
Page 13
363
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
LUNDGREN BROS CONSTRUCTION
lunbro LUNDGREN BROS CONSTRUCTION
Ck 134943 1129 07
Inv 11212007
Line Item Date Line Item Description
1128 07 Landscape Escrow 6860 Lake Harrison Circ
1128 07 Erosion Escrow 6860 Lake Harrison Circle
Inv 11212007 Total
Line Item Account
815 8201 2024
815 8202 2024
750 00
1 000 00
1 750 00
Ck 134943 Total 1 750 00
lunbro LUNDGREN BROS CONSTRUCTION 1 750 00
LUNDGREN BROS CONSTRUCTION 1 750 00
MACQUEEN EQUIPMENT
MACEQU MACQUEEN EQUIPMENT
Ck 134873 112107
Inv 2080117
Line Item Date Line Item Description
1109 07 inner tube weld air seal spring bolt
Inv 2080117 Total
Line Item Account
701 0000 4140 800 69
800 69
Ck 134873 Total 800 69
MACEQU MACQUEEN EQUIPMENT 800 69
MACQUEEN EQUIPMENT 800 69
Metro Testing
mettes Metro Testing
Ck 134944 1129 07
Inv 11282007
Line Item Date Line Item Description
1128 07 Overpymt Plumbing 18930 West 78th Street
Inv 11282007 Total
Line Item Account
101 1250 4901 29 94
29 94
Ck 134944 Total 29 94
mettes Metro Testing 29 94
Metro Testing 29 94
METROPOLITAN EMERGENCY MANAGER
MEMA METROPOLITAN EMERGENCY MANAGER
Ck 134874 112107
Inv 11202007
Line Item Date Line Item Description
1120 07 08 Membership App E Coppersmith
Inv 11202007 Total
Line Item Account
10 1 1220 4360 30 00
30 00
Ck 134874 Total 30 00
MEMA METROPOLITAN EMERGENCY MANAGER 30 00
METROPOLITAN EMERGENCY MANAGER 30 00
Page 14
364
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
MIDWEST ASPHALT CORPORATION
MIDASP MIDWEST ASPHALT CORPORATION
Ck 134875 112107
Iny 10292007
Line Item Date Line Item Description
10 29 07 Project C1680 32B 41AWE
Inv 10292007 Total
Ck 134875 Total
MIDASP
Line Item Account
700 0000 4150 358 25
358 25
358 25
MIDWEST ASPHALT CORPORATION 358 25
MIDWEST ASPHALT CORPORATION 358 25
MINNESOTA CONWAY
MINCON MINNESOTA CONWAY
Ck 134876 112107
Iny 366277
Line Item Date
11 15 07
Iny 366277 Total
MINNESOTA LIFE
MNLIFE MINNESOTA LIFE
Ck 134918 112107
Iny 11202007
Line Item Date
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
1120 07
11 20 07
1120 07
1120 07
1120 07
1120 07
1120 07
Ck 134876 Total
MINCON
MINNESOTA CONWAY
Line Item Description
recharge 20 abc seal collar pullpin
Line Item Account
10 1 1220 4530 40 33
40 33
40 33
MINNESOTA CONWAY 40 33
40 33
Line Item Description
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Life Insurance December 07
Line Item Account
210 0000 2011
101 1430 4040
720 7201 4040
720 7202 4040
101 1700 4040
101 1530 4040
101 1170 4040
101 1210 4040
210 0000 4040
101 1600 4040
101 1520 4040
101 1220 4040
101 1160 4040
101 1130 4040
700 0000 2011
701 0000 2011
720 0000 4040
101 1370 4040
701 0000 4040
10 1 1120 4040
10 1 I420 4040
700 0000 4040
10 1 131 0 4040
101 1550 4040
10 1 1320 4040
101 1250 4040
101 0000 2011
0 17
3 78
4 92
4 92
4 94
10 32
1 I76
14 16
15 42
19 78
2160
2856
30 24
31 93
38 24
38 24
40 32
41 75
60 03
66 66
6750
72 03
84 30
101 82
10446
113 52
43643
Page 15
365
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Iny 11202007 Total
Amount
1 467 80
Ck 134918 Total 1 467 80
MNLIFE MINNESOTA LIFE 1 467 80
MINNESOTA LIFE 1 467 80
MN CHILD SUPPORT PAYMENT CTR
MNCHIL MN CHILD SUPPORT PAYMENT CTR
Ck 134877 1121 07
Iny
Line Item Date
11 19 07
11 19 07
Iny Total
Line Item Description
Pay Date 112107 Case ID 001472166101
Pay Date 112107 Case ID 001472166101
Line Item Account
701 0000 2006
700 0000 2006
4144
459 71
50115
Ck 134877 Total 50115
MNCHIL MN CHILD SUPPORT PAYMENT CTR 50115
MN CHILD SUPPORT PAYMENT CTR 50115
MN DEPT OF HEALTH
MNHEAL MN DEPT OF HEALTH Account 700 0000 4509
Ck 134878 112107
Iny 11302007
Line Item Date Line Item Description
1130 07 10 12 3107 Community Water Supp SyC
Iny 11302007 Total
Line Item Account
700 0000 4509 11 916 00
11 916 00
Ck 134878 Total 11 916 00
MNHEAL MN DEPT OF HEALTH 11 916 00
MN DEPT OF HEALTH 11 916 00
MN DEPT OF NATURAL RESOURCES
MNNAT MN DEPT OF NATURAL RESOURCES
Ck 134881 112107
Iny 11202007
Line Item Date Line Item Description
1120 07 Feb Festiyal Ice Fishing Contest Permit
Iny 11202007 Total
Line Item Account
101 1611 4130 120 00
120 00
Ck 134881 Total 120 00
MNNAT MN DEPT OF NATURAL RESOURCES 120 00
MN DEPT OF NATURAL RESOURCES 120 00
MN State Fire Marshal
MNMar MN State Fire Marshal
Ck 134880 112107
Iny 11202007
Line Item Date
1120 07
Line Item Description
E Coppersmith 07 State Fire Code Update
Line Item Account
101 1220 4370 70 00
Page 16
366
CITY OF CHANHAS
User danieIle
Inv I 1202007 Total
Ck 134880 Total
MNMar
MN State Fire Marshal
MSRS
MSRS MSRS
Ck 134882
Inv
Line Item Date
1119 07
11 19 07
11 19 07
11 19 07
111 9 07
11 19 07
111 9 07
111 9 07
11 19 07
11 19 07
11 19 07
1119 07
11 19 07
11 19 07
11 19 07
1119 07
11 19 07
1119 07
1119 07
1119 07
1119 07
1119 07
11 19 07
11 19 07
11 19 07
11 19 07
1119 07
11 19 07
111 9 07
11 19 07
11 19 07
11 19 07
11 19 07
1119 07
11 19 07
11 19 07
Inv Total
Ck 134882 Total
MSRS
MSRS
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
70 00
70 00
MN State Fire Marshal 70 00
70 00
112107
Line Item Description
PR Batch 421 11 2007 Post Health 05 Emplr
PR Batch 421 11 2007 Post Health 3 Emplr
PR Batch 421 11 2007 Post Health 3 Emplr
PR Batch 421 11 2007 Post Health 05 Emplr
PR Batch 421 11 2007 Post Health 05 Emplr
PR Batch 421 11 2007 Post Health 05 Emplr
PR Batch 421 11 2007 Post Health 1 Emplr
PR Batch 421 11 2007 Post Health I Emplr
PR Batch 421 11 2007 Ret Health 5
PR Batch 421 11 2007 Post Health 1 Emplr
PR Batch 421 11 2007 Ret Health 3
PR Batch 421 11 2007 Ret Health 3
PR Batch 421 11 2007 Post Health 1 Emplr
PR Batch 421 11 2007 Post Health 2 Emplr
PR Batch 421 11 2007 Ret Health 5
PR Batch 421 11 2007 Ret Health 5
PR Batch 421 11 2007 Post Health 2 Emplr
PR Batch 421 11 2007 Post Health 5 Emplr
PR Batch 421 11 2007 Post Health 05 Emplr
PR Batch 421 11 2007 Post Health 3 Emplr
PR Batch 421 11 2007 Ret Health 5
PR Batch 421 11 2007 Ret Health 1
PR Batch 421 11 2007 Ret Health 1
PR Batch 421 11 2007 Post Health 7 Emplr
PR Batch 421 11 2007 Post Health 2 Emplr
PR Batch 421 11 2007 Ret Health 1
PR Batch 421 11 2007 Post Health 1 Emplr
PR Batch 421 11 2007 Ret Health 1
PR Batch 421 112007 Ret Health 2
PR Batch 421 11 2007 Ret Health 5
PR Batch 421 11 2007 Ret Health 2
PR Batch 421 11 2007 Ret Health 5
PR Batch 421 11 2007 Ret Health 3
PR Batch 421 11 2007 Ret Health 7
PR Batch 421 11 2007 Ret Health 2
PR Batch 421 11 2007 Ret Health 1
Line Item Account
210 0000 2016
700 0000 2016
701 0000 2016
701 0000 2016
700 0000 2016
720 0000 2016
210 0000 2016
720 0000 2016
210 0000 2016
701 0000 2016
700 0000 2016
701 0000 2016
700 0000 2016
701 0000 2016
700 0000 2016
701 0000 2016
700 0000 2016
101 0000 2016
101 0000 2016
101 0000 2016
720 0000 2016
210 0000 2016
720 0000 2016
101 0000 2016
101 0000 2016
701 0000 2016
101 0000 2016
700 0000 2016
701 0000 2016
10 1 0000 20 16
700 0000 2016
101 0000 2016
101 0000 2016
101 0000 2016
101 0000 2016
101 0000 2016
0 21
0 27
0 28
0 50
052
1 36
145
1 90
2 75
2 75
3 61
3 61
3 68
5 43
6 71
6 71
10 65
11 04
11 86
17 31
17 81
18 97
24 85
26 93
27 65
35 79
39 60
48 17
78 64
144 26
146 62
162 53
226 16
352 01
42142
539 19
2 403 20
2 403 20
MSRS 2 403 20
2 403 20
Page 17
367
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
MTI DISTRIBUTING INC
MTIDIS MTI DISTRIBUTING INC
Ck 134945 11I29 07
Inv 602516 00
Line Item Date Line Item Description
1120 07 shaft end cover ring gear seal
Inv 6025 I 6 00 Total
Ck 134945 Total
MTIDIS
Line Item Account
101 1550 4120 451 60
451 60
451 60
MTI DISTRIBUTING INC 451 60
MTI DISTRIBUTING INC 451 60
MX Logic
rnxlog MX Logic
Ck 134883 112107
Inv lNV129029
Line Item Date Line Item Description
11 0107 SPAM Anit Vi reus Svc November
Inv INV129029 Total
NATIONWIDE RETIREMENT SOLUTION
NA TRET NATIONWIDE RETIREMENT SOLUTION
Ck 134884 112107
Inv
Line Item Date
1119 07
11 19 07
11 19 07
11 19 07
Inv Total
Ck 134883 Total
mxlog
MX Logic
Ck 134884 Total
NATRET
Line Item Account
101 1160 4300 97 00
97 00
97 00
MX Logic 97 00
97 00
Line Item Description
PR Batch 421 11 2007 Nationwide Retirement
PR Batch 421 11 2007 Nationwide Retirement
PR Batch 421 11 2007 Nationwide Retirement
PR Batch 421 11 2007 Nationwide Retirement
Line Item Account
720 0000 2009
701 0000 2009
700 0000 2009
10 1 0000 2009
50 00
307 57
409 14
4 310 38
5 077 09
5 077 09
NATIONWIDE RETIREMENT SOLUTION 5 077 09
NA TIONWIDE RETIREMENT SOLUTION 5 077 09
Neaton Brothers Erosion LLC
neabro Neaton Brothers Erosion LLC
Ck 134946 11I29 07
Inv 6568
Line Item Date
1 1 09 07
Inv 6568 Total
Inv 6629
Line Item Date
1116 07
Inv 6629 Total
Line Item Description
Silt Fencing seeding 4170 Kings Road
Line Item Account
815 8202 2024 540 95
540 95
Line Item Description
Silt Fencing for 4170 Kings Road
Line Item Account
815 8202 2024 200 00
200 00
Page 18
368
CITY OF CHANHAS
User danielle
Ck 134946 Total
neabro Neaton Brothers Erosion LLC
Neaton Brothers Erosion LLC
Nelson Jim
nelsjim Nelson Jim
Ck 134947 1129 07
Inv 11282007
Line Item Date Line Item Description
1128 07 Presentation on 12 4 07
Inv 11282007 Total
Ck 134947 Total
nelsjim Nelson Jim
Nelson Jim
Nelson Julie
nelsjuli Nelson Julie
Ck 134885 112107
Inv 11202007
Line Item Date Line Item Description
1120 07 Trees Nelson Screening Project
Inv 11202007 Total
Ck 134885 Total
nelsjuli Nelson Julie
Nelson Julie
NOBLE SEASONAL LIGHTING
nobsea NOBLE SEASONAL LIGHTING
Ck 134886 112107
Inv 1445
Line Item Date
11 08 07
Inv 1445 Total
Line Item Description
warm white mini light string
Ck 134886 Total
Ck 134948
Inv 1517
Line Item Date
1119 07
Inv 1517 Total
1129 07
Line Item Description
Multi colored icicle light set
Ck 134948 Total
nobsea
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
740 95
740 95
740 95
Line Item Account
101 1560 4300 100 00
100 00
100 00
100 00
100 00
Line Item Account
101 1120 4300 1 400 00
1400 00
1 400 00
1 400 00
1 400 00
Line Item Account
101 1350 4120 1 665 66
1 665 66
1 665 66
Line Item Account
101 1350 4120 98 35
98 35
98 35
NOBLE SEASONAL LIGHTING
1 764 01NOBLESEASONALLIGHTING
1 764 01
Page 19
369
CITY OF CHANHAS
User danielle
Nye Ann
NyeAnn Nye Ann
Ck 134949 1129 07
Inv I 1282007
Line Item Date Line Item Description
1128 07 Repair Bill Invisible Fence
Inv I 1282007 Total
Ck 134949 Total
NyeAnn Nye Ann
Nye Ann
NYSTROM PUBLISHING COMPANY INC
nyspub NYSTROM PUBLISHING COMPANY INC
Ck 134950 1129 07
Inv 22012
Line Item Date
112107
Inv 22012 Total
Line Item Description
The Chanhassen Connection 32 pgs
Ck 134950 Total
nyspub
Accounts Payable
Check Detail Report Detail
Printed 1130107 14 54
Amount
Line Item Account
601 6016 4300 406 07
406 07
406 07
406 07
406 07
Line Item Account
101 1110 4340 5 136 00
5 136 00
5 136 00
NYSTROM PUBLISHING COMPANY INC 5 136 00
NYSTROM PUBLISHING COMPANY INC
OEHME PAUL
oehmpaul OEHME PAUL
Ck 134887 1121 07
Inv 11162007
Line Item Date Line Item Description
1116 07 MPWA Conference 1115107
Inv 11162007 Total
Ck 134887 Total
oehmpaul OEHME PAUL
OEHME PAUL
ONVOY
onvoy ONVOY Account 101 1160 4320
Ck 134888 112107
Inv 071102008908
Line Item Date Line Item Description
110107 Internet Charges
Inv 071102008908 Total
Ck 134888 Total
onvoy ONVOY
ONVOY
5 136 00
Line Item Account
101 1310 4370 30 07
30 07
30 07
30 07
30 07
Line Item Account
10 1 1160 4320 1 028 50
1 028 50
1 028 50
1 028 50
1 028 50
Page 20
370
CITY OF CHANHAS
User danielIe
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
PATCHIN MESSNER DODD
patmes PATCHIN MESSNER DODD
Ck 134951 1129 07
Iny 20752
Line Item Date Line Item Description
1126 07 Chan Dinner Theater SW Transit Auth
Iny 20752 Total
Line Item Account
101 1110 4300 1 556 25
1 556 25
Ck 134951 Total 1 556 25
patmes PATCHIN MESSNER DODD 1 556 25
PATCHIN MESSNER DODD 1 556 25
PATRICK CO
PATCO PATRICK CO
Ck 134889 112107
Iny 750600
Line Item Date
1112 07
Iny 750600 Total
Line Item Description
dog pet license tags
Line Item Account
101 1170 4110 346 13
346 13
Ck 134889 Total 346 13
PA TCO PATRICK CO 346 13
PATRICK CO 346 13
PHILIPS MEDICAL SYSTEMS
PHIMED PHILIPS MEDICAL SYSTEMS
Ck 134890 1121 07
Iny 9000752835
Line Item Date Line Item Description
10 3107 battery long life
Iny 9000752835 Total
Line Item Account
101 1220 4530 34144
341 44
Iny 9000798748
Line Item Date Line Item Description
10 31 07 battery fast response kit
Iny 9000798748 Total
Line Item Account
101 1220 4530 1 061 81
1 061 81
Ck 134890 Total 1403 25
PHIMED PHILIPS MEDICAL SYSTEMS 1 403 25
PHILIPS MEDICAL SYSTEMS 1 403 25
POSTMASTER
post POSTMASTER
Ck 134966 1130 07
Iny 113007
Line Item Date
1130 07
1130 07
Iny 113007 Total
Line Item Description
Utility bill postage
Utility bill postage
Line Item Account
700 0000 4330
701 0000 4330
389 04
389 04
778 08
Ck 134966 Total 778 08
Page 21
371
CITY OF CHANHAS
User danielIe
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
post POSTMASTER
Amount
778 08
POSTMASTER 778 08
POWER SYSTEMS
POWCHA POWER SYSTEMS
Ck 134891 112107
Iny 1049230
Line Item Date Line Item Description
1107 07 AER hose adaptors fittings
Iny 1049230 Total
Line Item Account
701 0000 4120 199 50
199 50
Iny 1049950
Line Item Date Line Item Description
1107 07 AER hose
Iny 1049950 Total
Line Item Account
701 0000 4120 5112
5112
Ck 134891 Total 250 62
POWCHA POWER SYSTEMS 250 62
POWER SYSTEMS 250 62
QUILL CORPORATION
quill QUILL CORPORATION
Ck 134952 1129 07
Iny 2599777
Line Item Date Line Item Description
1115 07 copy paper colored copy paper tape
Iny 2599777 Total
Line Item Account
101 1170 4110 12108
12108
InY 961217
Line Item Date
1102 07
Iny 961217 Total
Line Item Description
Credit Hammermill copy plus ppr 3hole
Line Item Account
101 1170 4110 48 95
48 95
Ck 134952 Total 72 13
quill QUILL CORPORATION 72 13
QUILL CORPORATION 72 13
Quilling Reysbech Jane
quiljane Quilling Reysbech Jane
Ck 134892 112107
Iny 11202007
Line Item Date Line Item Description
1120 07 Mulch Tree Murray Hill Rd Water Tower
Iny 11202007 Total
Line Item Account
101 1120 4300 25 00
25 00
Ck 134892 Total 25 00
quiljane Quilling Reysbech Jane 25 00
QuilIing Reysbech Jane 25 00
Page 22
372
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
REED CONSTRUCTION DATA
reebus REED CONSTRUCTION DATA
Ck 134893 112107
Inv 3761567
Line Item Date Line Item Description
10 09 07 J Steckling 58 lines
Inv 3761567 Total
Line Item Account
720 0000 4300 129 34
129 34
Inv 3761672
Line Item Date Line Item Description
10 09 07 J Steckling 58 lines
Inv 3761672 Total
Line Item Account
720 0000 4300 129 34
129 34
Ck 134893 Total 258 68
reebus REED CONSTRUCTION DATA 258 68
REED CONSTRUCTION DATA 258 68
Reliable Office Supplies
reI off Reliable Office Supplies
Ck 134894 112107
Inv FV357701
Line Item Date
1113 07
Inv FV357701
Line Item Description
BR88 nk rbn commdr calc
Total
Line Item Account
101 1170 4110 5 73
5 73
Inv FV785000
Line Item Date Line Item Description
1107 07 241b boise Mr Brt Ruby
Inv FV785000 Total
Line Item Account
101 1170 4110 16117
16117
Ck 134894 Total 166 90
Ck 134953 1129 07
Inv FWG06700
Line Item Date Line Item Description
1115 07 White Bx Copy Paper
Inv FWG06700 Total
Line Item Account
101 1170 4110 43 96
43 96
Ck 134953 Total 43 96
reloff Reliable Office Supplies 210 86
Reliable Office Supplies 210 86
Ryan Contracting Company
ryacon Ryan Contracting Company
Ck 134954 1129 07
Inv 11282007
Line Item Date Line Item Description
10 31 07 Dogwood Road Improvements
Inv 11282007 Total
Line Item Account
601 6015 4751 216 216 20
216 216 20
Ck 134954 Total 216 216 20
ryacon Ryan Contracting Company 216 216 20
Page 23
373
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Ryan Contracting Company
Amount
216 216 20
SCHARBER SONS INC
schson SCHARBER SONS INC
Ck 134895 112107
InY 385265
Line Item Date
10 31 07
Iny 385265 Total
Line Item Description
return of sensor
Line Item Account
101 1550 4410 59 64
59 64
InY 387564
Line Item Date
10 23 07
InY 387564 Total
Line Item Description
lug hammer bolts ring belts rotor
Line Item Account
101 1550 4120 1 998 67
1 998 67
Ck 134895 Total 1 939 03
schson SCHARBER SONS INC 1 939 03
SCHARBER SONS INC 1 939 03
SEH
seh SEH
Ck 134955 1129 07
InY 0169794
Line Item Date Line Item Description
1112 07 Update existing SEH Part 1 2 Wellhead
Iny 0169794 Total
Line Item Account
700 7017 4752 289 76
289 76
InY 0169795
Line Item Date Line Item Description
11 12 07 assist staffw completer water emerg con
InY 0169795 Total
Line Item Account
700 0000 4300 270 12
270 12
InY 0169797
Line Item Date Line Item Description
11 12 07 Professional Services OCT
Iny 0169797 Total
Line Item Account
700 7019 4300 405 35
405 35
InY 0169828
Line Item Date Line Item Description
11 12 07 Professional Services OCT
Iny 0169828 Totill
Line Item Account
700 0000 4300 2 940 55
2 940 55
Ck 134955 Total 3 905 78
seh SEH 3 905 78
SEH 3 905 78
SENTRY SYSTEMS INC
sensys SENTRY SYSTEMS INC
Ck 134896 112107
Iny 556256
Line Item Date
1130 07
Iny 556256 Total
Line Item Description
Monitoring Services Chan Library
Line Item Account
101 1190 4300 51 72
51 72
Page 24
374
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Ck 134896 Total
Amount
51 72
sensys SENTRY SYSTEMS INC 5172
SENTRY SYSTEMS INC 5172
SIEGLE CHARLES
siegchar SIEGLE CHARLES
Ck 134957 1129 07
Inv 11282007
Line Item Date Line Item Description
1128 07 work jeans
Inv 11282007 Total
Line Item Account
101 1370 4240 202 93
202 93
Ck 134957 Total 202 93
siegchar SIEGLE CHARLES 202 93
SIEGLE CHARLES 202 93
Siemens Building Technologies
SieBui Siemens Building Technologies
Ck 134956 1129 07
Inv 5440591357
Line Item Date Line Item Description
1120 07 Specialist work time trip charge
Inv 5440591357 Total
Line Item Account
700 7019 4300 640 00
640 00
Ck 134956 Total 640 00
SieBui Siemens Building Technologies 640 00
Siemens Building Technologies 640 00
SIGNS N SUCH
SIGNSU SIGNS N SUCH
Ck 134897 112107
Inv 11132007
Line Item Date Line Item Description
11 13 07 Name Plate
Inv 11132007 Total
Line Item Account
101 1170 4110 18 00
18 00
Ck 134897 Total 18 00
Ck 134958 1129 07
Inv 11162007
Line Item Date Line Item Description
1128 07 signage material
Inv 11162007 Total
Line Item Account
101 1170 4110 7782
7782
Ck 134958 Total 77 82
SIGNSU SIGNS N SUCH 95 82
SIGNS N SUCH 95 82
Page 25
375
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Amount
SNAP ON TOOLS
SNATOO SNAP ON TOOLS
Ck 134959 1129 07
Inv 16778774
Line Item Date Line Item Description
11 12 07 HD Stork Cut
11 12 07 hammer
Inv 16778774 Total
Line Item Account
101 1370 4260
101 1220 4260
33 79
272 88
306 67
Inv 16779726
Line Item Date Line Item Description
11 13 07 pry bar set terminal kit scrdrers
Inv 16779726 Total
Line Item Account
101 1370 4260 30648
30648
Ck 134959 Total 613 15
SNATOO SNAP ON TOOLS 613 15
SNAP ON TOOLS 613 15
Soboleski Tim
sobotim Soboleski Tim
Ck 134898 112107
Inv 11202007
Line Item Date Line Item Description
1 1 20 07 Release Grading Escrow from 9 20 07
Inv 11202007 Total
Line Item Account
815 8203 2024 250 00
250 00
Ck 134898 Total 250 00
sobotim Soboleski Tim 250 00
Soboleski Tim 250 00
SOFTWARE HOUSE INTERNATIONAL
SOFHOU SOFTWARE HOUSE INTERNATIONAL
Ck 134899 1 1 2107
Inv F2CED
Line Item Date
1113 07
Inv F2CED Total
Line Item Description
Office License 1st Half Microsoft Off 07
Line Item Account
400 4117 4703 11 789 55
11 789 55
Ck 134899 Total 11 789 55
SOFHOU SOFTWARE HOUSE INTERNATIONAL 11 789 55
SOFTWARE HOUSE INTERNATIONAL 11 789 55
SOUTH ST PAUL STEEL SUPPLY CO
SOUSTP SOUTH ST PAUL STEEL SUPPLY CO
Ck 134900 1 1 2107
Inv 01094593
Line Item Date Line Item Description
11 13 07 HR Flat
1113 07 HR Flat
1113 07 HR Flat
1113 07 HR Flat
Inv 01094593 Total
Line Item Account
701 0000 4150
700 0000 4150
101 1320 4150
101 1550 4150
171 77
171 78
343 56
343 56
1 030 67
Page 26
376
CITY OF CHANHAS
User danielIe
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Ck 134900 Total
Amount
1 030 67
SOUSTP SOUTH ST PAUL STEEL SUPPLY CO 1 030 67
SOUTH ST PAUL STEEL SUPPLY CO 1 030 67
Springbrook
Spring Springbrook
Ck 134901 1121 07
Inv 0008289
Line Item Date Line Item Description
1112 07 Training HR 10 31 110107
Inv 0008289 Total
Line Item Account
101 1160 4703 1 071 05
1 071 05
Ck 134901 Total 1 071 05
Spring Springbrook 1 071 05
Springbrook 1 07105
STEPP MANUFACTURING
sternan STEPP MANUFACTURING
Ck 134960 1I 29 07
Inv 35788
Line Item Date
1105 07
Inv 35788 Total
Line Item Description
heating element
Line Item Account
101 1320 4120 297 16
297 16
Ck 134960 Total 297 16
sternan STEPP MANUFACTURING 297 16
STEPP MANUFACTURING 297 16
SUNRAM CONSTRUCTION
SUNRAM SUNRAM CONSTRUCTION
Ck 134902 112107
Inv 11202007
Line Item Date Line Item Description
1120 07 Lake Ann Park Shelter Project
Inv 11202007 Total
Line Item Account
410 0000 4705 54 487 82
54 487 82
Ck 134902 Total 54 487 82
SUNRAM SUNRAM CONSTRUCTION 54 487 82
SUNRAM CONSTRUCTION 54 487 82
TARGET
target TARGET
Ck 134961 1129 07
Inv 11182007
Line Item Date Line Item Description
11 18 07 silverware supplies
Inv 11182007 Total
Line Item Account
101 1170 4110 2549
2549
Ck 134961 Total 2549
Page 27
377
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
target TARGET
Amount
25 49
TARGET 25 49
THEI LLC
THEI THEI LLC
Ck 134903 11 2107
Iny 42523
Line Item Date
10 05 07
Iny 42523 Total
Line Item Description
swenson py358 ss tecums
Line Item Account
400 0000 4705 3 407 95
3407 95
Ck 134903 Total 3 407 95
THEI THEI LLC 3 407 95
THEI LLC 3 407 95
TOLL GAS WELDING SUPPLY
TaL GAS TOLL GAS WELDING SUPPLY
Ck 134904 1121 07
Iny 192753
Line Item Date
10 30 07
Iny 192753 Total
Line Item Description
4x5 safety plate filter
Line Item Account
101 1320 4120 60 82
60 82
Ck 134904 Total 60 82
TaL GAS TOLL GAS WELDING SUPPLY 60 82
TOLL GAS WELDING SUPPLY 60 82
TWIN CITIES WESTERN RR CO
TWIWES TWIN CITIES WESTERN RR CO
Ck 134906 112107
Iny M006711IN
Line Item Date Line Item Description
11 16 07 site lease prepay Lease 92 3 92 4
Iny M006711IN Total
Line Item Account
700 0000 4300 1 000 00
1 000 00
Ck 134906 Total 1 000 00
TWIWES TWIN CITIES WESTERN RR CO 1 000 00
TWIN CITIES WESTERN RR CO 1 000 00
TWIN CITY GARAGE DOOR CO
TWIGAR TWIN CITY GARAGE DOOR CO
Ck 134905 112107
Iny 286170
Line Item Date Line Item Description
110107 Lake Ann Mtnce
Iny 286170 Total
Line Item Account
101 1550 4510 850 00
850 00
Ck 134905 Total 850 00
TWIGAR TWIN CITY GARAGE DOOR CO 850 00
Page 28
378
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
TWIN CITY GARAGE DOOR CO
Amount
850 00
UNITED WAY
UNIW A Y UNITED WAY
Ck 134908 112107
Iny
Line Item Date
11 19 07
Iny Total
Line Item Description
PR Batch 421 II 2007 United Way
Line Item Account
10 1 0000 2006 42 00
42 00
Ck 134908 Total 42 00
UNIWA Y UNITED WAY 42 00
UNITED WAY 42 00
UNIVERSITY OF MINNESOTA
UNIMIN UNIVERSITY OF MINNESOTA
Ck 134907 112107
Iny 11202007
Line Item Date Line Item Description
1120 07 E Coppersmith 52nd Annual Bldg Official
Iny 11202007 Total
Line Item Account
101 1220 4370 170 00
170 00
Ck 134907 Total 170 00
UNIMIN UNIVERSITY OF MINNESOTA 170 00
UNIVERSITY OF MINNESOTA 170 00
USA BLUE BOOK
usablu USA BLUE BOOK
Ck 134909 112107
InY 483269
Line Item Date
1107 07
Iny 483269 Total
Line Item Description
sign non portable water
Line Item Account
700 7019 4120 31 35
31 35
Ck 134909 Total 3135
usablu USA BLUE BOOK 31 35
USA BLUE BOOK 31 35
VALLEY RICH CO INC
VALRIC VALLEY RICH CO INC
Ck 134910 112107
Iny 12760
Line Item Date
10 17 07
Iny 12760 Total
Line Item Description
Job 6301 Trapline Cir Water Cons SyCS
Line Item Account
700 0000 4552 274 92
274 92
Ck 134910 Total 274 92
VALRIC VALLEY RICH CO INC 274 92
VALLEY RICH CO INC 274 92
Page 29
379
CITY OF CHANHAS
User danielIe
VERIZON WIRELESS
VERIZO VERIZON WIRELESS
Ck 1349 I I I I2 I07
Iny 11102007
Line Item Date Line Item Description
I III 0107 Wireless Services
Iny 11102007 Total
Ck 134911 Total
VERIZO VERIZON WIRELESS
VERIZON WIRELESS
VESSCO INC
VESSCO VESSCO INC
Ck 134962 I I29 07
Iny 40736
Line Item Date
10105107
Iny 40736 Total
Line Item Description
o ring yly cap yiton
Ck 134962 Total
VESSCO VESSCO INC
VESSCO INC
WACONIA FARM SUPPLY
WACFAR WACONIA FARM SUPPLY
Ck 134963 I I29 07
Iny 11282007
Line Item Date Line Item Description
I I28 07 2 polar dyed no lead 87 octane
Iny 11282007 Total
Ck 134963 Total
WACFAR WACONIA FARM SUPPLY
WACONIA FARM SUPPLY
WAYTEKINC
waytek WA YTEK INC
Ck 134912 I I2I 07
Iny 1309374
Line Item Date Line Item Description
I I07 07 3m auto elect tape
Iny 1309374 Total
Iny 1310788
Line Item Date Line Item Description
I I13 07 ex heavy duty heat shrink
I I13 07 ex heavy duty heat shrink
IIII 3 07 ex heavy duty heat shrink
III 13 07 ex heavy duty heat shrink
Iny 1310788 Total
Accounts Payable
Check Detail Report Detail
Printed 1 I30107 14 54
Amount
Line Item Account
101 1420 4310 6 13
6 13
6 13
6 13
6 13
Line Item Account
700 7019 4550 1 719 88
1 719 88
1 719 88
1 719 88
1 719 88
Line Item Account
101 1370 4170 21 664 37
21 664 37
21 664 37
21 664 37
21 664 37
Line Item Account
700 7019 4120 136 30
136 30
Line Item Account
700 0000 4120
701 0000 4120
101 1320 4120
101 1550 4120
3247
3247
64 94
64 94
194 82
Page 30
380
CJTY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1130 07 14 54
Ck 134912 Total
Amount
33112
waytek WA YTEK INC 331 12
WAYTEKINC 331 12
Weissman s Designs for Dance
weides Weissman s Designs for Dance
Ck 134913 112107
Jny 638144
Line Item Date
11 20 07
JnY 638144 Total
Line Item Description
Dance Costumes Cust 98156 ord 638144
Line Item Account
101 1535 4130 7 528 68
7 528 68
Ck 134913 Total 7 528 68
weides Weissman s Designs for Dance 7 528 68
Weissman s Designs for Dance 7 528 68
WELLS MARIANNE
WELLMARI WELLS MARIANNE
Ck 134914 112107
Jny 4074 100
Line Item Date Line Item Description
10 3107 Inyite for Fall Yoga 4074 100
Jny 4074 100 Total
Line Item Account
101 1761 4300 1 166 00
1 166 00
Ck 134914 Total 1 166 00
WELLMARI WELLS MARIANNE 1 166 00
WELLS MARIANNE 1 166 00
WILSON S NURSERY INC
wilnur WILSON S NURSERY INC
Ck 134964 11 29 07
JnY 034371
Line Item Date
112107
JnY 034371 Total
Line Item Description
Arborvitae planted w labor
Line Item Account
101 1120 4300 360 91
360 91
Ck 134964 Total 360 91
wilnur WILSON S NURSERY INC 360 91
WILSON S NURSERY INC 360 91
WM MUELLER SONS INC
wmmue WM MUELLER SONS INC
Ck 134915 112107
Jny 137509
Line Item Date
1130 07
Jny 137509 Total
Line Item Description
Fine Bit Mix Streets
Line Item Account
101 1320 4150 1 014 71
1 014 71
Page 3 I
381
CITY OF CHANHAS Accounts Payable Printed 1130 07 14 54
User danielle Check Detail Report Detail
Amount
Inv 13751O
Line Item Date Line Item Description Line Item Account
1130 07 Tack Oil Streets 101 1320 4150 25640
Inv 137510 Total 25640
Inv 137649
Line Item Date Line Item Description Line Item Account
1130 07 Fine Bix Mix Streets 101 1320 4150 365 27
Inv 137649 Total 365 27
Inv 137754
Line Item Date Line Item Description Line Item Account
1130 07 Fine Bit Mix S W 700 0000 4150 1 005 20
Inv 137754 Total 1 005 20
Inv 137816
Line Item Date Line Item Description Line Item Account
1130 07 Fine Bit Mix Streets 101 1320 4150 529 06
Inv 137816 Total 529 06
Inv 137961
Line Item Date Line Item Description Line Item Account
1130 07 Ball Diamond 410 0000 4701 10 122 72
Inv 137961 Total 10 122 72
Inv 138075
Line Item Date Line Item Description Line Item Account
1130 07 Concrete Rubble Disposal 700 0000 4150 90 00
1130 07 Concrete Rubble Disposal 700 0000 4150 180 00
1130 07 Concrete Rubble Disposal 101 1320 4150 39242
Inv 138075 Total 66242
Inv 138195
Line Item Date Line Item Description Line Item Account
1130 07 Ball Diamond 410 0000 4701 4 314 62
Inv 138195 Total 4 314 62
Inv 138255
Line Item Date Line Item Description Line Item Account
1130 07 Fine Bit Mix Streets 101 1320 4150 82 70
1130 07 Fine Bit Mix 700 0000 4150 315 80
1130 07 Fine Bit Mix 700 0000 4150 384 72
1130 07 Fine Bit Mix Streets 101 1320 4150 409 85
Inv 138255 Total 1 193 07
Inv 138344
Line Item Date Line Item Description Line Item Account
1130 07 Fine Bit Mix Streets 700 0000 4150 1 710 77
Inv 138344 Total 1 710 77
Inv 138392
Line Item Date Line Item Description Line Item Account
1130 07 Binder RockConbit 700 0000 4150 2 928 72
Inv 138392 Total 2 928 72
Inv 138457
Line Item Date Line Item Description Line Item Account
1130 07 Ball Diamond 410 0000 470 I 357 34
Page 32
382
CITY OF CHANHAS
User danielle
Inv 138457 Total
Inv 138458
Line Item Date Line Item Description
11130 07 screened fil1conbit
Inv 138458 Total
Inv 138601
Line Item Date Line Item Description
11130 07 screened fillconbit
Inv 138601 Total
Inv 138602
Line Item Date Line Item Description
11 30 07 screened fill conbit
Inv 138602 Total
Ck 134915 Total
Ck 134965
Inv 138391
Line Item Date
1029 07
Inv 138391 Total
11129 07
Line Item Description
Fine Bit Mix
Ck 134965 Total
WMMUE WM MUELLER SONS INC
WM MUELLER SONS INC
XCEL ENERGY INC
xcel XCEL ENERGY INC
Ck 134916 11121107
Inv 11122007
Line Item Date Line Item Description
11112 07 Electricity Charges 51 8451069 4
11112 07 Electricity Charges 51 6107078 4
Inv 11122007 Total
Inv 11132007
Line Item Date Line Item Description
11113 07 electricity charges
11113 07 electricity charges 51 8254397 3
Inv 11132007 Total
Ck 134916 Total
xcel XCEL ENERGY INC
XCEL ENERGY INC
ZIEGLER INC
ZIEGLE ZIEGLER INC
Ck 134917 11121107
Inv PCOOI031646
Line Item Date
10 27 07
Line Item Description
Cutting Edge
Accounts Payable
Check Detail Report Detail
Printed 11130 07 14 54
Amount
357 34
Line Item Account
700 0000 4150 2 582 12
2 582 12
Line Item Account
101 1320 4150 788 10
788 10
Line Item Account
101 1320 4150 280 36
280 36
28 110 88
Line Item Account
101 1550 4150 64743
64743
64743
28 758 31
28 758 31
Line Item Account
701 0000 4320
101 1170 4320
14 63
2 03843
2 053 06
Line Item Account
101 1551 4320
101 1170 4320
39 60
43 93
8353
2 13659
2 136 59
2 136 59
Line Item Account
10 1 1320 4120 67843
Page 33
383
CITY OF CHANHAS
User danielle
Inv PCOO 1 031646 Total
Ck 134917 Total
ZIEGLE
ZIEGLER INC
Total
ZIEGLER INC
Accounts Payable
Check Detail Report Detail
Printed 1130107 14 54
Amount
678 43
678 43
678 43
67843
450 100 55
Page 34
384
a5 tear payment coupon at perroratlon
CITY OF CHANHASSEN TOTAL CORPORATE ACTIVITY
22 199 31 CR
Post Tran
Date Date Reference Number Transaction Description Amount
11 02 11 02
KATHRYN AANENSON
J1
CREDITS
0 00
PURCHASES
32 00
CASH ADV
0 00
TOTAL ACTIVITY
32 00
Post Tran
Date Date Reference Number Transaction Descri tion Amount
10 17 1016 24223697289516675740451 SENSIBLE LAND USE COAL 952 545 0505 MN ro 4aO 4370 32 00
CUSTOMER SERVICE CALL ACCOUNT NUMBER ACCOUNT SUMMARY
PREVIOUS BALANCE 22199 31
1 800 344 5696 OTHEitEHAR ES 12 911 33
STATEMENT DATE DISPUTED AMOUNT CASH ADVANCES 00
11 15 07 00 CASH ADVANCE FEES 00
ATE I
CHARGES 00
SEND BILLING INQUIRIES TO
AMOUNT DUE CREDITS 682 89
PAYMENTS 22 199 31USBANK
12 228 44POBox6344
Fargo ND 58125 6344 ACCOUNT BALANCE 12 228 44
Page 1 of 8
C
385
Comnanv Name CITY OF CHANHASSEN
Cornorate Account Number
Statement Date 11 15 2007
CREDITS
13 25
PURCHASES
2 186 10
CASH ADV
0 00
Post Tran
Dale Dale
TOTAL ACTIVITY
2 172 85
1018 1016
1022 1018
10 22 1018
10 22 1018
10 22 10 18
1026 10 24
11 02 1031
Reference Number Transaction Deserl tion Amount
74455017290140010115105 WAL MART 3513 SE2 SHAKOPEE MNC I6W4dO 13 25CR24323007292263291010045WABASHASTREETCAVES6512921220MN500024388947292670345386099GUTHRIETHEATERFOUNDAMINNEAPOLISMN12987524388947292670345386107GUTHRIETHEATERFOUNDAMINNEAPOLISMN10IsP0413013800243889472926703453861157GUTHRIETHEATERFOUNDAMINNEAPOLISMNllO24224437299580068101307JOSEPHSGRILLSAINTPAULMN
24323007305263304010029 WABASHA STREET CAVES 651 292 1220 MN 125 00
EDWARj J COPPERSMITH CREDITS
0 00
PURCHASES
30 20
CASH ADV
0 00
TOTAL ACTIVITY
30 20
Post Tran
Dale Date Reference Number Transaction Descri tion Amount
10 17 1016 24269287289980000556708 AMERICAN BUTTON MACHINES 972 964 8350 TX IOllaOO43Bo 20
CROOKS CREDITS
0 00
PURCHASES
509 72
CASH ADV
0 00
Post Tran
Dale Date Reference Number
10 29 1023 247170572996429945958441029102624717057299642994595901
11 02 10 29 24717057305643054103901
1108 11 07 24717057311643114120772
Transaction Descri tion
SEELYE PLASTICS INC BLOOMINGTON MN
SEELYE pLASrlCSINC BLOOMINGTON MN
SEELYE PLASTICS INC BLOOMINGTON MN
SEELYE PLASTICS INC BLOOMINGTON MN
CREDITS
0 00
PURCHASES
44 01
CASH ADV
0 00
Post Tran
Dale Date Reference Number Transaction Descri tion
10 16 1015 24164077288091007634381 TARGET oo8623 CHANHASSEN MN1026102424226387298320465940585WALMARTEDENPRAIRIEMN
TODD GERHARDT CREDITS
0 00
PURCHASES
13 00
CASH ADV
0 00
TOTAL ACTIVITY
509 72
TOTAL ACTIVITY
44 01
TOTAL ACTIVITY
13 00
Post Tran
Dale Date Reference Number Transaction Descri lion
11 12 11 08 24013397313016426439215 ISLAND VIEW DINING WACONIA MN 10 l a 0461 0
Amount
28645
172 17
27 70
2340
Amount
19 04
24 97
Amount
13 00
Page 2 of 8
386
DALE GREGORY CREDITS
0 00
PURCHASES
379 00
Post Tran
Date Dale Reference Number Transaction Descri tion
TOTAL ACTIVITY
379 00
Amount
379 00
TOTAL ACTIVITY
684 25
Amount
684 25
TOTAL ACTIVITY
29 98
Amount
29 98
TOTAL ACTIVITY
25 59
CASH ADV
0 00
10 24 1022 24233427296572579452686 DONROWECOM LTD 800 367 3019 OR
90REY GRUENHAGEN CREDITS
0 00
PURCHASES
684 25
Post Tran
Date Date Reference Number Transaction Desert tion
CASH ADV
0 00
1105 11 02 24445007306041701639604 COW GOVERNMENT 800 8004239 IL
CREDITS
0 00
PURCHASES
29 98
Post Tran
Date Dale Reference Number Transaction Descr tion
00008623 CHANHASSEN MN1017101624164077289091007640635TARGET
TODD HOFFMAN CREDITS
0 00
PURCHASES
25 59
Post Tran
Date Date Reference Number
CASH ADV
0 00
CASH ADV
0 00
1025 10 24 24427337297040004290796
11 15 11 13 24323007318263317010292
11 15 11 13 24493987318200989100206
Transaction Descri tion
LAKEWINDS NATURAL F CHANHASSEN MN lOl IS 4ClO I
TOY WORL HANH CHANHASSEN MN to IPOO loD
ALLIED CAP CITY DAILY 6123320391 MN U Is20 40 0
BETH HOISETH CREDITS
0 00
PURCHASES
352 89
Post Tran
Date Date Reference Number Transaction Descr tion
1017 1015 24761977289276775018548
1018 1017 24013397290015745333080
1108 11 07 24427337311720004123319
1109 11 07 24127447312312179398600
1109 11 06 24632697312312152036100
CASH ADV
0 00
TOTAL ACTIVITY
352 89
GRANDMAS SALOON GRIL DULUTH MN
HOLIDAY INN HOTEL AND SUI DULUTH MN
577839 ARRIVAL 10 1507
CUB FOODS CHANHASSEN MN
FRANKIES PIZZA PASTA AND CHANHASSEN MN
HOOPS THREADS 952 9060099 MN
LAURIE A HOKKA CREDITS
0 00
PURCHASES
710 29
CASH ADV
0 00
TOTAL ACTIVITY
710 29
Amount
Amount
Page 3 of 8
7 09
8 50
10 00
13 55
80 24
5 98
85 12
168 00
387
yJti
Post Tran
Date Date Reference Number
10 18 10 17
1019 10 17
1023 1022
1025 10 24
1109 11 07
11 15 11 13
11 15 11 14
24755427291122917947337
24013397291015765836979
24129427295100001945123
24129427297100001217133
24270747311307930440062
24270767318200199401050
24435657319207299601202
KELLEY JANES
Post Tran
Date Date Reference Number
Com an Name CITY OF CHANHASSEN
Cor orate Account Number
Statement Date 11 15 2007
Transaction Descri tion
NATIONAL LEAGUE OF CITIES 202 6263064 DC
JIMMY JOHNS CHANHASSEN MN
DAVANNI S 13 EDEN PRAIRIE MN
AIRPORT SHUTTLE NEW ORLEANS LA
COSSETTA INC 651 2223079 MN
CHIPOTLE 0431 Q04 CHANHASSEN MN
IKEA BLOOMINGTON BLOOMINGTON MN
CREDITS
87 10
PURCHASES
327 10
CASH ADV
0 00
11 01 1030 74315187303920000091507 LOG BOOKS UNLIMITED TORONTO ON1106110274315187306920000092403LOGBOOKSUNLIMITEDTORONTOON
Transaction Descri tion
TOM KNOWLES
Post Tran
Date Date Reference Number
CREDITS
000
PURCHASES
971 50
CASH ADV
0 00
1109 11 07 24013397312016408859571 THE FAIR INC 612 3790110 MN
Transaction Descri tion
KAREN M LARSON
T
Post Tran
Date Date Reference Number
CREDITS
0 00
PURCHASES
194 03
CASH ADV
0 00
Transaction Descri tion
0 04 01108110724493987312286623600137BUYONLlNENOW8887181134MN1109110824493987312207399600093ABCOFFICE8019273020UT
tfJARK L1TTRN
Post Tran
Date Date Reference Number
10 16 1014 24427337287720004118061
11 01 1031 244273373047200039620541101103024445007304039110660031
11 08 11 06 24445007311048306534265
BRETT MARTlNS
CREDITS
0 00
PURCHASES
232 22
CASH ADV
0 00
TOTAL ACTIVITY
240 00
TOTAL ACTIVITY
971 50
TOTAL ACTIVITY
194 03
TOTAL ACTIVITY
232 22
Transaction Descri tion
CUB FOODS CHANHASSEN MN lot da 0 46IS
CUB FOODS CHANHASSEN MN 101 I ClodD 4 S
OFFICE MAX CHANHASSEN MN 101 no 41lOFFICEMAXCHANHASSENMNIVI111041Il
CREDITS
0 00
PURCHASES
766 88
CASH ADV
0 00
TOTAL ACTIVITY
766 88
Amount
360 00
84 79
86 24
52 00
23 81
87 45
16 00
Amount
327 10
87 10CR
Amount
971 50
Amount
146 17
47 86
Amount
191 10
23 90
7 44
9 78
Page 4 of 8
388
Comoanv Name CITY OF CHANHASSEN
Comorate Account Number
Statement Date 11 15 2007
Post Tran
Date Date Reference Number
10 18 10 17
10 23 10 22
10 24 10 22
1029 10 26
11 05 11 02
24493987290207099500011
24323007295254188010039
24610437296010178169064
24493987299207099500137
24610437307010178381963
BRAD MORSE
Transaction Descri tion Amount
KLlERS NURSERY MINNEAPOLIS MN
BLUFF CREEK GARDENS CHASKA MN
THE HOME DEPOT 2825 CHESKA MN
KLlERS NURSERY MINNEAPOLIS MN
THE HOME DEPOT 2825 CHESKA MN
286 90
85 20
27 13
282 49
85 16
CREDITS
0 00
PURCHASES
183 90
CASH ADV
0 00
TOTAL ACTIVITY
183 90
Post Tran
Date Date Reference Number Transaction Descri tion Amount
1029 10 27 24717057300693005902211 CABELAS COM 93635642 800 2374444 NE
DA E H NINOW
Post Tran
Date Date Reference Number
183 90
CREDITS
0 00
PURCHASES
5143
CASH ADV
0 00
TOTAL ACTIVITY
5143
Transaction Descri tion Amount
51431018101724717057291132910255812HDSUPPLYWATERWORKS2309529379666MO
RICHARD D RICE
Post Tran
Date Dale
1017 1015
1105 11 02
11 05 11 02
11 07 11 06
11 12 1108
Reference Number
24610437289004026126250
24445007306041701639786
24492797308118000100029
24445007310046986461651
24445007313050864638650
JERRY RUEGEMER
Post Tran
Date Date Reference Number
1025 1023 24013397297015949168442
1029 1026 24427337300710011792357
DEAN iCHMIEG
CREDITS
0 00
PURCHASES
2 119 08
CASH ADV
0 00
TOTAL ACTIVITY
2 119 08
Transaction Descri tion Amount
460 07
420 72
250 00
903 11
85 18
DELL MARKETING LP 800 234 1490 TX
CDW GOVERNMENT 800 8004239 IL
ESRI INC 909 7932853 CA
CDW GOVERNMENT 800 8004239 IL
OFFICE MAX CHANHASSEN MN
CREDITS
0 00
PURCHASES
108 51
CASH ADV
0 00
TOTAL ACTIVITY
108 51
Transaction Descr tion
L1L STEVIES CHANHASSEN MN to 1510 1
IVAN S SINCLAIR CHANHASSEN MN l 0 44 2 0
Amount
63 54
44 97
CREDITS
0 00
PURCHASES
197 37
CASH ADV
0 00
TOTAL ACTIVITY
197 37
Page 5 of 8
389
Company Name CITY OF CHANHASSEN
Comorate Account Number
Statement Date 11 15 2007
Post Tran
Date Date Reference Number Transaclion Descri tion Amount
29 98
11541
51 98
1017 1016 24164077289091007640452
1105 1102 24692167306000608002482
1105 11 03 24692167307000729069013
TARGET 00008623 CHANHASSEN MN
WEARGUARD 65816235 800388 3300 MA
WEARGUARD 65816235 800388 3300 MA
CHARLES SIEGLE CREDtTS
000
PURCHASES
490 60
CASH ADV
0 00
TOTAL ACTIVITY
490 60
Post Tran
Date Date Reference Number Transaction Descri lion Amount
1025 1023 24270747296300105620021
10 29 1028 24692167301000151889645
11 02 11 01 24493987306207523800088
11 09 11 07 24332397312000214819569
HENKE MANUFACTURING COR 913 6829000 KS
UPS 1Z1E41T80393317823 800 811 1648 GA
GLEN S TRUCK CENTER 7634284331 MN
4100 ABRA AUTO GLOO OF 00 7636561350 MN
145 11
13 86
266 63
65 00
JILL SINCLAIR CREDITS
000
PURCHASES
60 00
CASH ADV
0 00
TOTAL ACTIVITY
60 00
Post Tran
Date Date Reference Number Transaction Descri lion Amount
11 01 1029 24323007304263045019819 MN STATE HORTIC FALCON HEIGHT MN 120 720 I 43t60 00
JEAN STECKUNG CREDITS
000
PURCHASES
679 78
CASH ADV
0 00
TOTAL ACTIVITY
679 78
Post Tran
Date Date Reference Number Transaction Descri tion Amount
1022 1020 24445007294026438809962
1023 1023 24266577296286358200586
GREG STICliA CREDITS
000
Post Tran
Date Date Reference Number Transaction Descri tion Amount
RADERMACHER S JORDAN JORDAN MN 0 20 2 0 54 56
HOULlHANS 00111021 CHANHASSEN MN V I 53 01
11 08 1106 24071057311158194159038
11 12 1109 24164077314755393054499
CREDITS
571 67
PURCHASES
668 88
CASH ADV
000
TOTAL ACTIVITY
97 21
Post Tran
Date Date Reference Number Transaction Descri tion Amount
1018 1017 24164077290091008482059 TARGET 00008623 CHANHASSEN MN D 11014ft 2O 33 35
1018 1017 24493987291200099400612 PARTY AMERICA 1017 CHANHASSEN MN 10 110 l 4 t30 72 21
Page 6 of 8
390
Post Tran
Date Dale
1024 1023
1026 10 24
1029 1027
1029 1027
1030 10 29
1030 1029
1030 10 27
1031 10 29
HEIS
Reference Number
24427337296720003977680
24493987299200099401109
24164077300091010020960
24323017301117061010023
74164077302091012319157
74164077302091012349071
24270767302286256900033
74427337302720003922790
Post Tran
Date Date Reference Number
Com an Name CITY OF CHANHASSEN
Cor orate Account Number
Statement Date 11 15 2007
Transaction Descri lion Amount
CUB FOODS CHANHASSEN MN 0 0144120 79 20
PARTY AMERICA 1017 CHANHASSEN MN 10 110140 120 15 29
TARGET 00013524 CHASKA MN 0 lip I qqla 283 23
DOMINO S PIZZA 01976 CHANHASSEN MNlOU 144100 125 18
TARGET 00013524 CHASKA MNLO 1 14M D 80 00CR
TARGET 00008623 CHANHASSEN MN 452 07CR
TOLL CO CHANHASSEN MN l 60 42
CUB FOODS SAI CHANHASSEN MN 0 I 1t1 44 W 39 60CR
CREDITS
0 00
PURCHASES
61 33
CASH ADV
0 00
10 16 10 14 24427337287720004115430 CUB FOODS CHANHASSEN MN
10 16 10 14 24427337288710010022463 IVAN S SINCLAIR CHANHASSEN MN
Transaction Descri lion
MARJORIE A THEIS
Post Tran
Date Date Reference Number
1019 1017 74387757291004011861237
1029 1026 24270767299200499300047
1029 1026 24387757300004014065194
1029 1026 24455017299140013130529
RANDY WAHL
Post Tran
Date Date Reference Number
CREDITS
10 87
CASH ADV
0 00
TOTAL ACTIVITY
61 33
TOTAL ACTIVITY
311 72
Amount
28 31
33 02
Amount
lO loqCR
2278
TOTAL ACTIVITY
38 06
11 15 11 14 24 164077318941582107829 RADIOS HACK COR00161315 CHANHASSEN MN
11 15 11 14 24164077318941582243392 RADIOS HACK COR00161315 CHANHASSEN MN
CORI WALLIS
Post Tran
Date Date Reference Number
PURCHASES
322 59
Transaction Descri tion
MICHAELS 6733 EDEN PRAIRIE MN
MODERN OFFICElDIV RMI 952 9494913 MN
MICHAELS 6733 EDEN PRAIRIE MN
WAL MART 1855 EDEN PRAIRIE MN
CREDITS
0 00
PURCHASES
38 06
CASH ADV
0 00
Transaction Descri tion
CREDITS
0 00
PURCHASES
33347
CASH ADV
0 00
1022 1020 24717057293692935983738 CABELAS COM 93474980 800 2374444 NE
11 08 11 06 24071057311987190162483 PRO PACK SHIP CHANHASSEN MN
Transaction Descri tion
TOTAL ACTIVITY
33347
Amount
1148
26 58
Amount
100 90
232 57
Page 7 of 8
391
1
Company Name CITY OF CHANHASSEN
Comorate Account Number
Statement Date 11 15 2007
m Depattment OOOOO Tofa1 m m 12 228 44
Division 00000 Total 12 228 44
Page 8 of 8
392