CC Packet 2007 11 26AGENDA
CHANHASSEN CITY COUNCIL
MONDAY, NOVEMBER 26, 2007
CHANHASSEN MUNICIPAL BUILDING, 7700 MARKET BOULEVARD
5:30 P.M. - CITY COUNCIL WORK SESSION, FOUNTAIN CONFERENCE ROOM
Note: If the City Council does not complete the work session items in the time allotted, the
remaining items will be considered after the regular agenda.
A. Continuation of 2008 Budget Discussions:
1) Fire Department
2). 2008-2012 Capital Improvement Program
B. ITEM DELETED ** (Establish Guidelines/Benchmarks for Staffing Levels in All
Departments).
C. Discussion of City Manager's Performance Review Process.
7:00 P.M. – REGULAR MEETING, CITY COUNCIL CHAMBERS
CALL TO ORDER (Pledge of Allegiance)
PUBLIC ANNOUNCEMENTS
D. Invitation to Tree Lighting Ceremony, Saturday, December 1.
CONSENT AGENDA
All items listed under the Consent Agenda are considered to be routine by the city council and
will be considered as one motion. There will be no separate discussion of these items. If
discussion is desired, that item will be removed from the Consent Agenda and considered
separately. City council action is based on the staff recommendation for each item. Refer to the
council packet for each staff report.
1. a. Approval of Minutes:
- City Council Work Session Minutes dated November 13, 2007
- City Council Summary Minutes dated November 13, 2007
- City Council Verbatim Minutes dated November 13, 2007
Receive Commission Minutes:
- Planning Commission Summary Minutes dated November 6, 2007
- Planning Commission Verbatim Minutes dated November 6, 2007
b. Stonefield, Project No. 06-07: Approve Street & Utility Improvements.
1
c. Approve Master Contract for Consulting Services with Barr Engineering
Company, PW009B.
d. Approve Nominations for 2007 Environmental Excellence Awards.
e. Lakeside Development, Northwest Corner of Lyman Boulevard and Lakeview
Road East, Applicant: Sienna Corporation : Approval of Minor PUD
Amendment to adjust internal setback requirements from 20 feet to 15 feet and
adjust the wetland setback consistent with current wetland setback requirements.
f. Lyman Boulevard Improvements Project 06-03: Approve Resolution for
Advancement of Municipal State Aid Funds.
VISITOR PRESENTATIONS
2. Presentation of Storm Logo for Chanhassen High School, Nancy Kracke (verbal).
LAW ENFORCEMENT/FIRE DEPARTMENT UPDATE
3. a. Sgt. Peter Anderley, Carver County Sheriff's Department
b. Chief Gregg Geske, Chanhassen Fire Department
PUBLIC HEARINGS - None
UNFINISHED BUSINESS
3.5 ITEM DELETED ** (Request for a Metes & Bounds Subdivision, 6444 Murray Hill
Road, Gilbert & Jillene Kreidberg.)
NEW BUSINESS
4. T-MOBILE: Request for Conditional Use Permit and Site Plan Review Amendments to
allow a 145-foot Telecommunication Tower with a 4-foot Lightning Rod and a 6-foot
Privacy Fence; Located West of Great Plains Boulevard, North of Creekwood Drive,
South of Halla Nursery, and East of Bluff Creek Golf Course (Outlot A, Halla Maryanne
Addition). Applicant: T-Mobile USA.
COUNCIL PRESENTATIONS
ADMINISTRATIVE PRESENTATIONS
CORRESPONDENCE PACKET
ADJOURNMENT
2
A copy of the staff report and supporting documentation being sent to the city council will be
available after 2:00 p.m. on Thursday. Please contact city hall at 952-227-1100 to verify that
your item has not been deleted from the agenda any time after 2:00 p.m. on Thursday.
GUIDELINES FOR VISITOR PRESENTATIONS
Welcome to the Chanhassen City Council Meeting. In the interest of open communications, the Chanhassen City
Council wishes to provide an opportunity for the public to address the City Council. That opportunity is provided at
every regular City Council meeting during Visitor Presentations.
1. Anyone indicating a desire to speak during Visitor Presentations will be acknowledged by the Mayor.
When called upon to speak, state your name, address, and topic. All remarks shall be addressed to the City
Council as a whole, not to any specific member(s) or to any person who is not a member of the City
Council.
2. If there are a number of individuals present to speak on the same topic, please designate a spokesperson
that can summarize the issue.
3. Limit your comments to five minutes. Additional time may be granted at the discretion of the Mayor. If
you have written comments, provide a copy to the Council.
4. During Visitor Presentations, the Council and staff listen to comments and will not engage in discussion.
Council members or the City Manager may ask questions of you in order to gain a thorough understanding
of your concern, suggestion or request.
5. Please be aware that disrespectful comments or comments of a personal nature, directed at an individual
either by name or inference, will not be allowed. Personnel concerns should be directed to the City
Manager.
Members of the City Council and some staff members may gather at Houlihan’s Restaurant & Bar, 530 Pond Promenade in Chanhassen
immediately after the meeting for a purely social event. All members of the public are welcome.
3
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 9522271100
Fax 952 227 1110
Building Inspections
Phone 952227 1180
Fax 952 227 1190
Engineering
Phone 952227 1160
Fax 952 227 1170
Finance
Phone 952227 1140
Fax 952 227 1110
Park Recreation
Phone 952227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952227 1130
Fax 952227 1110
Public Works
1591 Park Road
Phone 9522271300
Fax 952227 1310
Senior Center
Phone 952 2271125
Fax 952227 1110
Web Site
www ci chanhassen mn us
A l
MEMORANDUM
TO Mayor City Council Members
Greg Sticha Finance Director 7FROM
DA TE November 26 2007
SUBJ 2008 Department Budgets
BACKGROUND
As part of our budget process each year the individual departments present their
requested budgets for the upcoming year During the work session on
November 26 the Fire Department will present their budget for 2008 and we
will discuss the 2008 2012 Capital Improvement Program
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play4
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1220 Fire Prevention Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 128 215 133 500 136 100 1 9
4011 Overtime 218 1 000 1 000 0 0
4020 Salaries Wages Temp 135 284 160 000 160 000 0 0
4030 Contributions Retirement 178 853 187 000 187 000 0 0
4040 Contributions Insurance 18 089 19 600 19 100 2 6
4050 Workers Compensation 12 762 14 500 14 500 0 0
TOTAL PERSONAL SERVICES 473 421 515 600 517 700 04
4120 Supplies Equipment 9 862 11 000 11 000 0 0
4130 Supplies Program 5 808 5 000 5 000 0 0
4140 Supplies Vehicles 4 216 7 000 7 000 0 0
4150 Maintenance Materials 484 1 000 1 000 0 0
4170 Motor Fuels and Lubrication 292 0 0
4210 Books Periodicals 1 230 1 000 1 000 0 0
4240 Uniforms Clothing 12 940 13 500 13 500 0 0
4260 Small Tools Equipment 4467 5 000 5 000 0 0
4290 Misc Materials Supplies 3 820 3 500 3 500 0 0
TOTAL MATERIALS SUPPLIES 43 118 47 000 47 000 0 0
4300 Fees Services 11 369 16 500 16 500 0 0
4310 Telephone 9 087 6 000 6 000 0 0
4320 Utilities 24462 23 000 23 000 0 0
4330 Postage 76 0 0
4350 Cleaning Waste Removal 5 339 7 000 7 000 0 0
4360 Subscriptions Memberships 1 533 3 000 3 000 0 0
4370 Travel Training 19 012 10 000 10 000 0 0
4375 Promotional Expense 8483 9 000 9 000 0 0
4440 License Registration 18 0 0
4483 Insurance General Liability 1 405 1 000 1 000 0 0
4510 Repair Maintenance Building 4 567 7 000 7 000 0 0
4520 Repair Maintenance Vehicles 4 165 7 000 7 000 0 0
4530 Repair Maintenance Equip 11 150 5 000 5 000 0 0
4531 Repair Maintenance Radios 6 966 9 000 9 000 0 0
4901 Refunds Reimbursements 819 0 0
Contribution for Performance 12 500 12 500 100 0
4933 Sales Tax 389 0 0
TOTAL CONTRACTUAL SERVICES 108 840 116 000 116 000 0 0
TOTAL FIRE PREVENTION ADMIN 625 379 678 600 680 700 0 3
5
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952227 1110
Building Inspections
Phone 952227 1180
Fax 952 227 1190
Engineering
Phone 952227 1160
Fax 952 227 1170
Finance
Phone 952227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
WIiW ci chanhassen mn us
A L
MEMORANDUM
TO Mayor
City Council
Greg Sticha Finance Director 07
November 26 2007
2008 2012 CIP Review
FROM
DA TE
SUBJ
Our capital plan is a five year projection of what we will need to spend to
maintain our existing capital assets and add improvements or system expansions
when necessary The preliminary estimate for the next five years exceeds
73 700 000 which is substantially more than the amount raised through the tax
levy for operations and debt service Much of this amount has to be financed
through bonding It is incumbent on the City Council and staff to exercise prudent
stewardship over these capital assets This plan will fully fund our capital needs
while maintaining existing services and providing city services
The primary change that occurred in 2005 was the method of funding equipment
purchases The city now levies 824 000 year for the Capital Improvement Fund
400 on an ongoing basis to fund these capital purchases For 2008 these
purchases are estimated to cost 878 000 We have well over 100 000 in cost
savings from the 2007 Capital Replacement Fund purchases due to the elimination
of buying a public works dump plow truck In 2009 we are planning on spending
only 645 000 and just over 1 000 000 in 2010 which will average just over
800 000 year between the two years
Other projects of note include an upgrade to Lyman Boulevard a Public Works
Facility or upgrade the construction of a second water treatment plant and a new
Fire Station and related equipment
Phase I of Lyman Boulevard upgrades ST 003 estimated at 7 9 Million are
scheduled at this point for some time in 2008 and include a contribution from
Carver County and the City of Chaska as well as funding from the arterial
collector fund park dedication fund pavement management fund and the city s
storm water and water utility funds
The Public Works Facility improvement MB 003 is planned for 2008 We have
8 million in the CIP for the construction of a new facility 7 million of which
will be paid for by revenue bonds It is expected that the City Council will be
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play6
2008 2012 CIP Review
November 26 2007
Page 2
discussing the funding of a new facility versus upgrading the current facility or an
existing facility in the area over the next several months
Staff has also included a west water treatment facility W 037 with an estimated
cost of 11 million for 2012
There is also a request for a new fire station MB 009 in 2010 with an estimated
cost of 2 0 million for the building and related equipment purchases of
1 0 million EQ 086 of which 500 000 will be funded by the capital
replacement fund and 500 000 by G O Bonds This new station will provide
service to the 2005 MUSA expansion area
Staff looks forward to discussing these items with the City Council and receiving
feedback in order to prepare the final CIP and Budget which will be approved in
December
ATTACHMENTS
1 Sources of Revenue Summary Funding Sources
2 Projects by Funding Source
3 Department Summary Projects by Type
4 Projects by Department
7
City of Chanhassen MN
Capital Improvement Program
2008 thru 2012
DEPARTMENT SUMMARY
Department 2008 2009 2010 2011 2012
Major Equipment 849 100 686 600 1 531 600 876 700 463 500
Municipal Buildings 8 070 000 300 000 2 000 000 125 000
Park Trail Improvements 669 800 1 285 000 216 000 771 000 696 000
Planning 30 000 75 000
Sanitary Sewer Improvements 670 000 401 000 2 910 000 305 000 100 000
Street Improvements 11 170 000 3 895 000 8 185 000 1 585 000 7 785 000
Surface Water Management 1 760 000 1 170 000 1 110 000 670 000 970 000
Water System Improvements 3 930 000 770 000 3 515 000 3 745 000 12 245 000
GRAND TOTAL 27 148 900 8 582 600 19 467 600 7 952700 22 384 500
Total
4 407 500
10 495 000
3 637 800
105 000
4 386 000
32 620 000
5 680 000
24 205 000
85 536 300
8
City of Chanhassen MN
Capita Improvement Program
2008 thru 2012
PROJECTS BY DEPARTMENT
Department Project Priority 2008 2009 2010 2011 2012 Total
Major Equipment
Fire Depl SCBA Equipment EQ 004 n a 5 000 5 000 5 000 5 000 20 000
Laptop Computers EQ 009 n a 50 000 50 000
PPE TumouVHelmets EQ 010 n a 15 000 15 000 15 000 15 000 60 000
Computer Network Equipment Purchases Upgrades EQ 013 n a 97 700 104 500 116 800 90 900 93 200 503 100
Telecommunication Purchases Upgrades EQ 014 n a 6 200 50 000 20 000 6000 6000 88 200
Community Dev Light Duty Trucks EQ 015 n a 54 000 30 000 28 000 29 000 141 000
Dump Plow Truck Replacements Additions EQ 016 n a 161 000 371 800 169 000 701 800
Vibratory Roll Packer EQ 019 n a 45 000 45 000
Equipment Trailers EQ 021 n a 25 000 25 000
Tar Kettle EQ 022 n a 30 000 30 000
Ford 555C Backhoe EQ 023 n a 80 000 80 000
Line Striper EQ 025 n a 9 000 9 000
AudioNisual Equipment EQ 026 n a 10 000 10 000 10 000 10 000 10 000 50 000
Groundsmaster 580 Mower Replacement EQ 028 n a 82 000 82 000
Light Duty Trucks Public Works EQ 029 n a 32 000 32 000 64 000
Sewer Bobcat Snow Accessories EQ 031 n a 7 000 7000
Grounds Mower Replacement EQ 034 n a 37 000 37 000
Mailing F older lnserter EQ 041 n a 20 000 20 000
Software Purchases EQ 048 n a 30 500 42 000 37 000 22 000 22 000 153 500
Computerized Records Retention System EQ 049 n a 12 700 31 300 8 000 9 000 61 000
Lig ht Duty Trucks Parks EQ 052 n a 98 000 33 000 65 000 196 000
Fire Vehicles EQ 054 n a 40 000 40 000 40 000 120 000
Aerial Photography for City GIS Datasets EQ 055 n a 32 000 43 000 44 500 119 500
Front End Loaders EQ 056 n a 175 000 175 000
Skidloader Planer EQ 061 n a 15 000 15 000
Light Duty Trucks Utilities EQ 062 n a 54 000 70 000 55 000 179 000
Administration Vehicle EQ 063 n a 25 000 25 000
Engineering Vehicles EQ 065 n a 58 000 58 000
Storage Area Network EQ 081 n a 45 000 20 800 20 800 20 800 107 400
CSO Truck EQ 083 n a 30 000 30 000
Office EQ 084 n a 5 000 5 000 5 000 5 000 5 000 25 000
Standby Generator City Hall EQ 085 n a 130 000 130 000
Equipment for New Fire Station EQ 086 n a 1 000 000 1 000 000
Major Equipment Total 849 100 686 600 1 531 600 876 700 463 500 4 407 500
rMunicipal Buildings
Public Works aclllty Improvements MB 003 n a 8 060 000 8 060 000
Siding and Backing Replacement MB 008 n a 20 000 20 000
Fire Station 3 MB 009 n a 2 000 000 2 000 000
City Hall Remodel MB 010 n a 125 000 125 000
Pioneer Cemetery Fencing and Landscaping MB 013 n a 10 000 10 000
City Hall North Parking Lot MB 014 n a 280 000 280 000
9
Department Project Priority 2008 2009 2010 2011 2012 Total
Municipal Buildings Total 8 070 000 300 000 2 000 000 125 000 10 495 000
Park Trail Improvements I
Hwy 101 North Trail Connection PK T 029 n a 114 000 114 000
Picnic Tables Park Benches PK T 042 n a 6 000 6 000 6 000 6 000 6 000 30 000
Trees PK T 043 n a 5 000 5 000 5 000 5 000 5 000 25 000
Arboretum Business Park Lot 12 Trail PK T 047 n a 317 000 317 000
Hwy 41 Pedestrian UnderpasslTrail Grant Match PK T 069 n a 125 000 125 000
Tennis Court Repair PK T 072 n a 50 000 50 000
Liberty at Creekside Trail PK T 075 n a 275 000 275 000
The Preserve Trail and Bridge PK T 076 n a 250 000 250 000
Lakeside Trail Lyman Boulevard PK T On n a 60 000 60 000
2005 MUSA Park Acquisition and Development PK T 078 n a 400 000 400 000
Recreation Center fitness Equipment PK T 079 n a 10 000 10 000 10 000 10 000 10 000 50 000
Recreation Center Lobby F umiture PK T 080 n a 18 800 18 800
Lyman Blvd Trail Improvements PK T 081 n a 500 000 500 000
Carver Beach Park Fishing Dock Extension PK T 082 n a 3 000 3 000
Bluff Creek Drive Gap Trail PK T 083 n a 350 000 350 000
Pioneer Boulevard Gap Trail PK T 084 n a 300 000 300 000
Disc Golf Course Contribution PK T 085 n a 20 000 20 000
Lake Ann Park Ballfield Shelter Restrooms PK T 086 n a 750 000 750 000
Park Trail Improvements Total 669 800 1 28S 000 216 000 771 000 696 000 3 637 800
rPlatnfing
Update of Comprehensive Plan PL 001 n a 30 000 30 000
County Rd 61 old 212 Corridor Study PL 002 n a 75 000 75 000
Planning Total 30 000 75 000 105 000
rSanitaySewerImprovements
Inflow and Infiltration Abatement SS 012 n a 200 000 200 000 200 000 200 000 800 000
Sanitary Sewer Replacement SS 014 n a 250 000 250 000 500 000
Sanitary Lift Station Rehabilitation Program SS 017 n a 140 000 76 000 260 000 105 000 100 000 681 000
Dell Road77th Street Forcemain Replacement SS 018 n a 125 000 125 000
2010 MUSA Sanitary Lift Station SS 020 n a 2 200 000 2 200 000
Lift Station 3 Standby Generator SS 021 n a 80 000 80 000
Sanitary Sewer Improvements Total 670 000 401 000 2 910 000 30S 000 100 000 4 386 000
rStreeHmprovements I
West 78th St Streetlights ST 001 n a 300 000 300 000
Lyman Boulevard Improvements ST 003 n a 8 950 000 5 300 000 5 600 000 19 850 000
Annual Street Improvement Program ST 012 n a 1 600 000 3 500 000 2 200 000 1 200 000 1 500 000 10 000 000
TH 101 Corridor Preservation Planning ST 017 n a 200 000 300 000 500 000
Pavement Management ST 018 n a 385 000 385 000 385 000 385 000 385 000 1 925 000
TH 5 Corridor Study TH 41 to TH 212 ST 019 n a 10 000 10 000
Downtown Decorative Streetlights Signal Enhancemnt ST 020 n a 35 000 35 000
Street Improvements Total 11 170 000 3 89S 000 8 18S 000 1 S85 000 7 78S 000 32 620 000
SWMP 012 n a 350 000 300 000 300 000 300 000 300 000 1 550 000
10
Department Project Priority 2008 2009 2010 2011 2012 Total
Property Acquisition SWMP 014 n a 250 000 100 000 200 000 200 000 100 000 850 000
Street Improvement Projects Storm Water Mgmt SWMp 019 n a 400 000 300 000 400 000 1 100 000
Leaf Vacuum SWMp 021 n a 40 000 40 000
Excavator SWMp 022 n a 70 000 70 000
Vactor Used SWMp 023 n a 200 000 200 000
Bluff Cr Nat Resources Mgmt Plan Implementation SWMp 024 n a 150 000 150 000 150 000 150 000 150 000 750 000
Lake Minnewashta Outlet SWMp 026 n a 30 000 30 000
Natural Resources Stewardship Plan SWMp 027 n a 50 000 20 000 20 000 20 000 20 000 130 000
Landings Court Storm Water Pond Imp SWMp 029 n a 70 000 70 000
Lake Susan Shoreline Restoration Improvements SWMp 030 n a 90 000 90 000
West Lotus Lake Drainage Improvements SWMp 031 n a 400 000 400 000 800 000
Surface Water Management Total 1 760 000 1 170 000 1 110 000 670 000 970 000 5 680 000
Water System Improvements I
Repainting West 76th St Water Tower W 015 n a 80 000 80 000
Arboretum Water Main W 020 n a 220 000 220 000
Watermain Replacement W 024 n a 660 000 700 000 700 000 2 060 000
Well 4 Improvements W 025 n a 350 000 350 000
Pressure Reducing Station 8 W 027 n a 65 000 150 000 215 000
Raw Well Water Collection System W 030 n a 500 000 500 000
Well Rehabilitation Program W 032 n a 80 000 40 000 45 000 45 000 45 000 255 000
West Water Treatment Plant W 037 n a 11 000 000 11 000 000
Stand by Generator for wells W 038 n a 120 000 120 000
Audubon South Watermain Loop W 039 n a 150 000 150 000
Repaint Melody Hills Water Tower W040 n a 300 000 300 000
Repaint Lake Lucy Water Stand Pipe W 041 n a 550 000 550 000
High Zone Elevated Storage Tank W 042 n a 1 850 000 1 850 000
Well 14 Improvements W 043 n a 1 200 000 1 200 000
Well 13 W 044 n a 1 200 000 1 200 000
West Junior High School Well W 045 n a 715 000 715 000
Low Zone 1 million gallon Elevated Storage Tank W 046 n a 2 500 000 2 500 000
Well 12 Improvements W 047 n a 940 000 940 000
Water System Improvements Total 3 930 000 770 000 3 515 000 3 745 000 12 245 000 24 205 000
GRAND TOTAL 27 148 900 8 582 600 19 467 600 7 952 700 22 384 500 85 536 300
11
City of Chanhassen MN
Capital Improvement Program
2008 thru 2012
FUNDING SOURCE SUMMARY
Source 2008 2009 2010 2011 2012 Total
Arterial Collector Dvlpmnt Fee 250 000 1 000 000 1 250 000
AssessmenURevolving Assess Fund 2 055 000 1 140 000 1 900 000 1 200 000 1 500 000 7795 000
Cable TV Fund 10 000 10 000 10 000 10 000 10 000 50 000
Capital Replacement Fund 877 900 645 600 1 031 600 806 700 533 500 3 895 300
General Fund 30 000 75 000 105 000
GO Bonds 7 160 000 2 500 000 9 660 000
MSA 1410 125 2 627 125 957 125 117 125 2 261 125 7 372 625
Other Agency Contribution 5 846 000 340 000 2 960 000 3 506 000 12 652 000
Park Dedication Fund 1 141 000 1 275 000 556 000 761 000 686 000 4 419 000
Reforestation 50 000 20 000 20 000 20 000 20 000 130 000
Revenue Bonds 11 000 000 11 000 000
Sewer Utility Fund 1420 000 455 000 2 960 000 375 000 155 000 5 365 000
Surface Water Utility Fund 2471 000 950 000 1 540 000 650 000 1 200 000 6 811 000
Tax Levy 267 875 267 875 267 875 267 875 267 875 1 339 375
Water Utility Fund 4 160 000 777 000 3 765 000 3 745 000 1 245 000 13 692 000
GRAND TOTAL 27 148 900 8 582 600 19467 600 7 952700 22 384 500 85 536 300
12
City of Chanhassen MN
Capital Improvement Program
2008 thru 2012
PROJECTS BY FUNDING SOURCE
Source Project Priority 2008 2009 2010 2011 2012 Total
I Arterial Collector Dvlpmnt Fee
Lyman Boulevard Improvements ST 003 n a 250 000 1 000 000 1 250 000
Arterial Collector Dvlpmnt Fee Total 250 000 1 000 000 1 250 000
Assessment Revolvmg Assess Fund
City Hall North Parking Lot MB 014 n a 140 000 140 000
Lyman Boulevard Improvements ST 003 n a 400 000 400 000
Annual Street Improvement Program ST 012 n a 1 600 000 1 000 000 1 900 000 1 200 000 1 500 000 7 200 000
Downtown Decorative Streetlights Signal Enhancemnt ST 020 n a 35 000 35 000
Audubon South Watermain Loop W 039 n a 20 000 20 000
AssessmentJRevolving Assess Fund Total 2 055 000 1 140 000 1 900 000 1 200 000 1 500 000 7 795 000
lCaOlerV Fund
AudioNisual Equipment EQ 026 n a 10 000 10 000 10 000 10 000 10 000 50 000
Cable TV Fund Total 10 000 10 000 10 000 10 000 10 000 50 000
reapital R placemenrFund I
Fire Dept SCBA Equipment EQ 004 n a 5 000 5 000 5 000 5 000 20 000
Laptop Computers EQ 009 n a 50 000 50 000
PPE Turnout Helmets EQ 01O n a 15 000 15 000 15 000 15 000 60 000
Computer Network Equipment Purchases Upgrades EQ 013 n a 97 700 104 500 116 800 90 900 93 200 503 100
Telecommunication Purchases Upgrades EQ 014 n a 6 200 50 000 20 000 6 000 6 000 88 200
Community Dev Light Duty Trucks EQ 015 n a 54 000 30 000 28 000 29 000 141 000
Dump Plow Truck Replacements Additions EQ 016 n a 161 000 371 800 169 000 701 800
Vibratory Roll Packer EQ 019 n a 45 000 45 000
Equipment Trailers EQ 021 n a 25 000 25 000
Tar Kettle EQ 022 n a 30 000 30 000
Ford 555C Backhoe EQ 023 n a 80 000 80 000
Line Striper EQ 025 n a 9 000 9 000
Groundsmaster 580 Mower Replacement EQ 028 n a 82 000 82 000
Light Duty Trucks Public Works EQ 029 n a 32 000 32 000 64 000
Grounds Mower Replacement EQ 034 n a 37 000 37 000
Mailing Folder lnserter EQ 041 n a 20 000 20 000
Software Purchases EQ 048 n a 30 500 42 000 37 000 22 000 22 000 153 500
Computerized Records Retention System EQ 049 n a 12 700 31 300 8 000 9 000 61 000
Light Duty Trucks Parks EQ 052 n a 98 000 33 000 65 000 196 000
Fire Vehicles EQ 054 n a 40 000 40 000 40 000 120 000
Aerial Photography for City GIS Datasets EQ 055 n a 32 000 43 000 44 500 119 500
Front End Loaders EQ 056 n a 175 000 175 000
Skidloader Planer EQ 061 n a 15 000 15 000
13
Source Project Priority 2008 2009 2010 2011 2012 Total
Administration Vehicle EO 063 n a 25 000 25 000
Engineering Vehicles EO 065 n a 58 000 58 000
Storage Area Network EO 081 n a 45 000 20 800 20 800 20 800 107 400
CSO Truck EO 083 n a 30 000 30 000
Office EO 084 n a 5 000 5 000 5 000 5 000 5 000 25 000
Standby Generator City Hall EO 085 n a 130 000 130 000
Equipment for New Fire Station EO 086 n a 500 000 500 000
Siding and Backing Replacement MB 008 n a 20 000 20 000
City Hall Remodel MB 010 n a 125 000 125 000
Pioneer Cemetery Fencing and Landscaping MB 013 n a 10 000 10 000
Recreation Center fitness Equipment PK T 079 n a 10 000 10 000 10 000 10 000 10 000 50 000
Recreation Center Lobby Fumiture PK T 080 n a 18 800 18 800
Capital Replacement Fund Total 877 900 645 600 1 031 600 806 700 533 500 3 895 300
General Fund I
Update of Comprehensive Plan PL 001 n a 30 000 30 000
County Rd 61 old 212 Corridor Study PL 002 n a 75 000 75 000
General Fund Total 30 000 75 000 105 000
GO Bonos I
Equipment for New Fire Station EO 086 n a 500 000 500 000
Public Works Facility Improvements MB 003 n a 7 160 000 7 160 000
Fire Station 3 MB 009 n a 2 000 000 2 000 000
GO Bonds Total 7 160 000 2 500 000 9 660 000
MSA
West 78th St StreeUights ST 001 n a 300 000 300 000
Lyman Boulevard Improvements ST 003 n a 1 243 000 490 000 1 844 000 3 577 000
Annual Street Improvement Program ST 012 n a 2 500 000 300 000 2 800 000
TH 101 Corridor Preservation Planning ST 017 n a 50 000 50 000 100 000
Pavement Management ST 018 n a 117 125 117 125 117 125 117 125 117 125 585 625
TH 5 Corridor Study TH 41 to TH 212 ST 019 n a 10 000 10 000
MSA Total 1 410 125 2 627 125 957 125 117 125 2 261 125 7 372 625
10th erAgen cyContribu tion
City Hall North Parking Lot MB 014 n a 140 000 140 000
Lyman Boulevard Improvements ST 003 n a 5457 000 2710 000 3 506 000 11 673 000
TH 101 Corridor Preservation Planning ST 017 n a 150 000 250 000 400 000
Lake Susan Shoreline Restoration Improvements SWMP 030 n a 39 000 39 000
West Lotus Lake Drainage Improvements SWMP 031 n a 200 000 200 000 400 000
Other Agency Contribution Total 5 846 000 340 000 2 960 000 3 506 000 12 652 000
lPark Dedication Fund
PK T 029Hwy1U1NorthIralllonnecllon n a 114 000 114 000
Picnic Tables Park Benches PK T 042 n a 6 000 6 000 6 000 6 000 6 000 30 000
Trees PK T 043 n a 5 000 5 000 5 000 5 000 5 000 25 000
Arboretum Business Park Lot 12 Trail PK T 047 n a 317 000 317 000
14
Source Project Priority 2008 2009 2010 2011 2012 Total
Hwy 41 Pedestrian UnderpassfTrail Grant Match PK T 069 n a 125 000 125 000
Tennis Court Repair PK T 072 n a 50 000 50 000
Liberty at Creekside Trail PK T 075 n a 275 000 275 000
The Preserve Trail and Bridge PK T 076 n a 250 000 250 000
Lakeside Trail Lyman Boulevard PK T 077 n a 60 000 60 000
2005 MUSA Park Acquisition and Development PK T 078 n a 400 000 400 000
Lyman Blvd Trail Improvements PK T 081 n a 500 000 500 000
Carver Beach Park Fishing Dock Extension PK T 082 n a 3 000 3 000
Bluff Creek Drive Gap Trail PK T 083 n a 350 000 350 000
Pioneer Boulevard Gap Trail PK T 084 n a 300 000 300 000
Disc Golf Course Contribution PK T 085 n a 20 000 20 000
Lake Ann Park Ballfield Shelter Restrooms PK T 086 n a 750 000 750 000
Lyman Boulevard Improvements 5T 003 n a 500 000 350 000 850 000
Park Dedication Fund Total 1 141 000 1 275 000 556 000 761 000 686 000 4 419 000
eforestatJon I
Natural Resources Stewardship Plan 5WMP 027 n a 50 000 20 000 20 000 20 000 20 000 130 000
Reforestation Total 50 000 20 000 20 000 20 000 20 000 130 000
Revenue Bonils I
West Water Treatment Plant W 037 n a 11 000 000 11 000 000
Revenue Bonds Total 11 000 000 11 000 000
l we rU tilityFun d I
Light Duty Trucks Utilities EO 062 n a 54 000 70 000 55 000 179 000
Public Works Facility Improvements MB 003 n a 700 000 700 000
Inflow and Infiltration Abatement 55 012 n a 200 000 200 000 200 000 200 000 800 000
Sanitary Sewer Replacement 55 014 n a 250 000 250 000 500 000
Sanitary Lift Station Rehabilitation Program 55 017 n a 140 000 76 000 260 000 105 000 100 000 681 000
Dell Roadl77th Street Forcemain Replacement 55 018 n a 125 000 125 000
2010 MUSA Sanitary Lift Station 55 020 n a 2 200 000 2 200 000
Lift Station 3 Standby Generator 55 021 n a 80 000 80 000
Lyman Boulevard Improvements 5T 003 n a 50 000 50 000 100 000
Sewer Utility Fund Total 1 420 000 455 000 2 960 000 375 000 155 000 5 365 000
lS u rfa ce Wa ter H tilityFund I
Public Works Facility Improvements MB 003 n a 200 000 200 000
Lyman Boulevard Improvements 5T 003 n a 800 000 450 000 250 000 1 500 000
SWMP Implementation 5WMP 012 n a 350 000 300 000 300 000 300 000 300 000 1 550 000
Property Acquisition 5WMP 014 n a 250 000 100 000 200 000 200 000 100 000 850 000
Street Improvement Projects Storm Water Mgmt 5WMP 019 n a 400 000 300 000 400 000 1 100 000
Leaf Vacuum 5WMP 021 n a 40 000 40 000
Excavato r 5WMP 022 n a 70 000 70 000
Vactor Used 5WMP 023 n a 200 000 200 000
Bluff Cr Nat Resources Mgmt Plan Implementation 5WMP 024 n a 150 000 150 000 150 000 150 000 150 000 750 000
Lake Minnewashta Outlet 5WMP 026 n a 30 000 30 000
Landings Court Storm Water Pond Imp 5WMP 029 n a 70 000 70 000
Lake Susan Shoreline Restoration Improvements 5WMP 030 n a 51 000 51 000
West Lotus Lake Drainage Improvements 5WMP 031 n a 200 000 200 000 400 000
15
Source Project Priority 2008 2009 2010 2011 2012 Total
Surface Water Utility Fund Total 2 471 000 950 000 1 540 000 650 000 1 200 000 6 811 000
ITax Levy
Pavement Management ST 018 n a 267 875 267 875 267 875 267 875 267 875 1 339 375
Tax Levy Total 267 875 267 875 267 875 267 875 267 875 1 339 375
Water Utility Fund I
Sewer Bobcat Snow Accessories EQ 031 n a 7 000 7 000
Lyman Boulevard Improvements ST 003 n a 250 000 250 000 500 000
Repainting West 76th SI Water Tower W 015 n a 80 000 80 000
Arboretum Water Main W 020 n a 220 000 220 000
Waterrnain Replacement W 024 n a 660 000 700 000 700 000 2 060 000
Well 4 Improvements W 025 n a 350 000 350 000
Pressure Reducing Station 8 W 027 n a 65 000 150 000 215 000
Raw Well Water Collection System W 030 n a 500 000 500 000
Well Rehabilitation Program W 032 n a 80 000 40 000 45 000 45 000 45 000 255 000
Stand by Generator for wells W 038 n a 120 000 120 000
Audubon South Waterrnain Loop W 039 n a 130 000 130 000
Repaint Melody Hills Water Tower W 040 n a 300 000 300 000
Repaint Lake Lucy Water Stand Pipe W 041 n a 550 000 550 000
High Zone Elevated Storage Tank W 042 n a 1 850 000 1 850 000
Well 14 Improvements W 043 n a 1 200 000 1 200 000
Well 13 W 044 n a 1 200 000 1 200 000
West Junior High School Well W 045 n a 715 000 715 000
Low Zone 1 million gallon Elevated Storage Tank W 046 n a 2 500 000 2 500 000
Well 12 Improvements W 047 n a 940 000 940 000
Water Utility Fund Total 4 160 000 777 000 3 765 000 3 745 000 1 245 000 13 692 000
GRAND TOTAL 27 148 900 8 582 600 19467 600 7 952 700 22 384 500 85 536 300
16
Capital Improvement Program
City of Chanhassen MN
Project EQ 004
Project Name Fire Dept SCBA Equipment
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life 20 years
Category Fire
Priority n a
Total Project Cost 95 000
Account 1 400 4115 4705 Account 3
Account 2
Description I
This program is to provide additional SCBA bottles and upgrade air packs as needed
Justification I
SCBA packs will be 20 years old in 2011 Replacement will bring packs to new standards Bottles replaced in 2007 due to DOTNFPA expiration
will be traded in or used with new packs if the same brand is purchased
Prior
75 000 I
1 ot l
Expenditures
Equipment
2008
5 000
5 000
2009
5 000
5 000
2010
5 000
5 000
2011
5 000
5 000
2012 Total
20 000
20 000Total
Prior
75 000 I
fotal
Funding Sources
Capital Replacement Fund
2008
5 000
5 000
2009
5 000
5 000
2010
5 000
5 000
2011
5 000
5 000
2012 Total
20 000
20 000Total
Operational ImpactOther I
This assists the department on emergency scenes and helps reduce on scene times by eliminating the need to shuttle bottles from the scene to the
fire station for re filling
17
Capital Improvement Program
City of Chanhassen MN
Project EQ 009
Project Name Laptop Computers
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life 7 10 years
Category Fire
Priority nla
Total Project Cost 50 000
Account 1 400 4127 4703 Account 3
Account 2
Description I
Involves installing laptops in all front line vehicles to enable responding personnel to access building pre plans hazardous materials data hydrant
and other utility maps address locations etc
Justification I
The project will enhance Fire Department operations allowing for increased safety as a result of easy access to important information It will also
make it easier to find best routes and or alternative routes when responding to emergencies
Expenditures
Office Equipment
2008 2009 2010
50 000
50 000
2011 2012 Total
50 000
50 000Total
Funding Sources
Capital Replacement Fund
2008 2009 2010
50 000
50 000
2011 2012 Total
50 000
50 000Total
Operational ImpactOtlter I
There should be no operational impact from this purchase The current maintenance budget will accommodate for this addition
18
Capital Improvement Program
City of Chanhassen MN
Iroj ct EQ OIO
Project Namc PPE Turnout Helmets
2008 thnl2012 Contact
D rartment Major Equipment
Account 1 400 4105 4705 Account 3
Type Unassigned
Useful Life 20 years
Category Fire
Priority n a
Account 2
Total Project Cost 75 000
Description I
Replacement of 3 5 sets per year as a result of damage received from firefighting activities
after they complete their probationary period
The city will also provide new members with new gear
Justification I
Turnout gear lasts approximately 5 7 years on average
Prior
15 000 I
Total
Expenditures
Maintenance
2008
15 000
15 000
2009
15 000
15 000
2010
15 000
15 000
2011
15 000
15 000
2012 Total
60 000
60 000Total
Prior
15 000 I
Total
Funding Sources
Capital Replacement Fund
2008
15 000
15 000
2009
15 000
15 000
2010
15 000
15 000
2011
15 000
15 000
2012 Total
60 000
60 000Total
Operational ImpactOtller I
There should be no operational impact from this purchase The current maintenance budget will accommodate for this addition
19
Capital Improvement Program
City of Chanhassen MN
Project EQ 013
Project Name ComputerNetwork Equipment PurchasesfUpgrades
2008 thru 2012
Contact Unassigned
Department Major Equipment
Account 1 400 4126 4703 Account 3
Type Equipment
Useful Life Unassigned
Category Administration
Priority nla
Accou nt 2 Total Project Cost 503 100
Description I
Funds the purchase of replacement user and network computers printers peripherals and networking hardware The replacement schedule was
adopted in 1999 and is subject to modifieations by the MIS Coordinator with approval from the City Manager and department heads
Justification I
Budgeting and purchasing eomputer equipment through this projeet allows the city greater flexibility to direct equipment to where it is needed the
most rather than in individual budgets The replacement schedule was developed in 1999 by the MIS Coordinator and was approved by the 1999
council appointed IT task force Expenditures in the 2008 budget request are for the replacement of core and departmental switches 4 network
servers 4 workstations 8 desktop PCs and one notebook PC Replaced equipment will be recycled if possible for use by other users or will be
sold on the city public surplus auction site
Expenditures
Office Equipment
2008
97 700
97 700
2009
104 500
104 500
2010
116 800
116 800
2011
90 900
90 900
2012
93 200
93 200
Total
503 100
503 100Total
Funding Sources
Capital Replacement Fund
2008
97 700
97 700
2009
104 500
104 500
2010
116 800
116 800
2011
90 900
90 900
2012
93 200
93 200
Total
503 100
503 100Total
Operational ImpactOther I
20
Capital Improvement Program
City of Chanhassen MN
Project EQ 014
Project Name Telecommunication PurchaseslUpgrades
2008 thru 2012
Contact Unassigned
Department Major Equipment
Account 1 400 4101 4703 Account 3
Type Equipment
Useful Life 5 7 years
Category Administration
Priority n a
Account 2
Total Project Cost 88 200
Description I
This project funds the expansion and upgrades to the city telephone systems excluding cellular equipment which remains an individual department
budget item The current system is an Intertel Axxess PBX which serves City Hall Public Works the main fire Station the Recreation Center and
the Water Treatment Plant A new call accounting software package was added in 2007 The system is planned to be replaced in 2009 at which
time it will be 10 years old
Justification I
A central PBX system simplifies the management of phone services and for the integration with other city applications such as unified messaging
The city PBX server hardware and software will continue to be upgraded as necessary until its scheduled replacement in 2009 Two new facilities
a new Public Works building and a third Fire Station are projected to be constructed in 2009 1010 The new system would be sized to
accommodate additional services Any new phone equipment for the new buildings would be funded out of the construction projects A redundant
PBX switch is proposed for the year following the replacement of the Axxess system Only upgrades to individual telephones are proposed in
2008
Expenditures
Office Equipment
2008
6 200
6 200
2009
50 000
50 000
2010
20 000
20 000
2011
6 000
6000
2012
6 000
6 000
Total
88 200
88 200Total
Funding Sources
Capital Replacement Fund
2008
6 200
6 200
2009
50 000
50 000
2010
20 000
20 000
2011
6 000
6 000
2012
6 000
6000
Total
88 200
88 200Total
Operational ImpactOtller I
A new maintenance aggreement was established with Eschelon Telecom following the expiration of the 5 year warranty from InterteI The MIS
operating budget includes annual maintenance charges for this service
21
Capital Improvement Program
City of Chanhassen MN
Project EQ 015
Project lame Community Dev Light Duty Trucks
2008 thl1l 2012
Contact Unassigned
Department Major Equipment
Account 1 400 4107 4704 Account 3
Type Vehicles
Useful Life Unassigned
Category Community Development
Priority n a
Account 2
Total Project Cost 141 000
Description I
These purchases are consistent with the Vehicle Replacement Schedule Replacement units are generally purchased early in the year to
accommodate the time frames established by Hennepin County and the State of Minnesota Cooperative Purchasing Program
2008 605 1996 Ford Ranger Pickup
2008 606 1998 Ford Ranger Pickup
2009 801 1996 Chevrolet Astro Van
20 0 6061999 Ford Ranger Pickup
2012 6032001 Ford Ranger Pickup
Justification I
These vehicles are used to provide building inspection services throughout the community The average replacement age is over 10 years
Expenditures
Vehicles
2008
54 000
54 000
2009
30 000
30 000
2010
28 000
28 000
2011 2012
29 000
29 000
Total
141 000
141 000Total
Funding Sources
Capital Replacement Fund
2008
54 000
54 000
2009
30 000
30 000
2010
28 000
28 000
2011 2012
29 000
29 000
Total
141 000
141 000Total
Operational ImplK t10tzer I
These purchases will include a limited warranty and will reduce the annual maintenance and repair eosts as compared to the vehicles replaced
22
Capital Improvement Program
City of Chanhassen MN
Project EQ 016
Project Name Dump Plow Truck Replacements Additions
2008 thrll 2012
Account I 400 4108 4704 Account 3
Account 2
Contact Unassigned
Department Major Equipment
Type Vehicles
Useful Life Unassigned
Category Street Equipment
Priority nla
Total Project Cost 701 800
Description I
These purchases are required to maintain a reliable truck fleet Costs include truck chassis dump box hydraulic system snow wing snow plow
and sander Truck chassis costs are higher due to new fcderal mandated anti lock braking requirements effective since 2000 These vehicles are
purchased using either the Hennepin County or State of MN cooperative bid systems Orders for truck chassis are typically required to be placed
up to one year in advance of delivery
2008 II 7 I 994 Ford L8000 Dump Truck
20 0 118 1994 Ford L8000 Dump Truck
20 II 115 1991 Ford F800 Dump Truck
20 II 116 1992 Ford L8000 Dump Truck
Justification I
These vehicles are used to provide a variety of maintenance services throughout the community including winter response for plowing and hauling
snow The average replacement age is 16 5 years Winter emergency service necessitates these vehicles be reliable and dependable Growth in the
community creates additional work for these trucks These vehicle purchases are consistent with the Vehicle Replacement Schedule
2010Expenditures
Vehicles
2008
161 000
161 000
2009 2011
371 800
371 800Total
2012
169 000
169 000
Total
701 800
701 800
Funding Sources
Capital Replacement Fund
2008
161 000
161 000
2009 2010 2011
371 800
371 800Total
2012
169 000
169 000
Total
701 800
701 800
Operational ImpactOther I
These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced
23
Capital Improvement Program
City of Chanhassen MN
Project EQ 019
Projl ct Name Vibratory Roll Packer
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
Priority n a
Total Project Cost 45 000
Account 1 400 0000 4704 Account 3
Accou nt 2
Description I
Purchase is scheduled to replace the 1987 Rasco Vibratory Roll Packer The purchase is consistent with the Vehicle Replacement Schedule
2008 133 1987 Rasco Vibratory Roll Packer
Justification I
This machine is used extensively in the patching and overlaying of City streets The unit will be 21 years old at the time of replacement
Expenditures
Vehicles
2008 2009
45 000
45 000
2010 2011 2012 Total
45 000
45 000Total
Funding Sources
Capital Replacement Fund
2008 2009
45 000
45 000
2010 2011 2012 Total
45 000
45 000Total
Operational ImpactOther I
This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the machine replaced
24
Capital Improvement Program
City of Chanhassen MN
Project EQ 021
Projl ct Nanw Equipment Trailers
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
Priority n a
Total Project Cost 25 000
Account 1 400 0000 4705 Account 3
Account 2
Description I
Provides for replacement of an existing and the addition of a 20 000 Ib 10 ton capacity tandem axle trailer
2008 138 Hilbros 20 000 Ib tandem axle trailer
Justification I
These trailers are used extensively in the paving operation to transport the paver machine roll packer skidloader and other equipment to and from
the job sites The utility and parks departments also utilize this trailer for their work The existing trailer is 20 years old
Expenditures
Equipment
2008
25 000
25 000
2009 2010 2011 2012 Total
25 000
25 000Total
Funding Sources
Capital Replacement Fund
2008
25 000
25 000
2009 2010 2011 2012 Total
25 000
25 000Total
Operational ImpactOther I
Both purchases include a limited warranty
25
Capital Improvement Program
City of Chanhassen MN
ProjHt EQ 022
Project ame Tar Kettle
2008 thrll 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
Priority n a
Total Project Cost 30 000
Account I 400 0000 4705 Account 3
Account 2
Description I
Provides for replacement of the existing tar kettle
2008 134 1997 Stepp SBF 300 Tar Kettle
Justification I
The existing tar kettle is used extensively in the pavement maintenance operations Due to the nature of its use the life expectancy of this unit is
limited The kettle was purchased in J 997 and will be 11 years old at the time of trade in
Expenditures
Equipment
2008
30 000
30 000
2009 2010 2011 2012 Total
30 000
30 000Total
Funding Sources
Capital Replacement Fund
2008
30 000
30 000
2009 2010 2011 2012 Total
30 000
30 000Total
Operational ImpactOther I
This purchase will include a limited warranty and will eliminate an expensive overhaul on the existing unit
26
Capital Improvement Program
City of Chanhassen MN
I I oj ct EQ 023
ProjlCt Nam Ford 555C Backhoe
2008 thru 2012
Contact Unassigned
Department Major Equipment
Typ Equipment
Useful Life Unassigned
Category Street Equipment
Priorit nla
Total Project Cost 80 000
Account 1 400 4111 4705 Account 3
Account 2
Description I
Provides for the replacement of an existing 1989 Tractor Backhoe
2009 143 1989 Ford 555C Backhoe
Justification I
The tractor backhoe is used extensively in maintenance operations The backhoe is sometimes used by the Utility Department for watermain
breaks and utility replacement projects The Parks Department also uses the backhoe for their projects This purchase is consistent with the
Equipment Replacement Schedule
Expenditures
Equipment
2008 2009
80 000
80 000
2010 2011 2012 Total
80 000
80 000Total
Funding Sources
Capital Replacement Fund
2008 2009
80 000
80 000
2010 2011 2012 Total
80 000
80 000Total
Operational ImpactOther I
This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the machine replaced
27
Capital Improvement Program
City of Chanhassen MN
Project EQ 025
Projl ct llllle Line Striper
2008 thm 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
Priority n a
Total Project Cost 9 000
Accoulit 1 400 0000 4705 Account 3
An ount 2
Description I
Provides for the replacement of an existing line striping machine
2010 NA 1994 Graco GM5000 Line Striper 5 hp
Justification I
This machine is used to paint pavement markings and stripe lanes on roads This purchase will ensure timely and reliable pavement marking
operations The purchase is consistent with the Equipment Replacement Schedule
Expenditures
Equipment
2008 2009 2010 2011 2012
9 000
9 000
Total
9 000
9 000Total
Funding Sources
Capital Replacement Fund
2008 2009 2010 2011 2012
9 000
9 000
Total
9 000
9 000Total
Operational ImptretlOtzer I
This purchase will include a limited warranty
28
Capital Improvement Program
City of Chanhassen MN
Project EQ 026
Project Name AudioNisuul Equipment
2008 thru 2012
Contact Unassigned
Department Major Equipment
Account 1 210 0000 4705 Accou nt 3
Type Equipment
Useful Life Unassigned
Category Administration
Priority nfa
Account 2
Total Project Cost 50 000
Description I
Provides for the systematic maintenance and upgrading of audio visual equipment
Justification I
The original AN equipment was purchased in 1989 with the upgrades in 1994
Expenditures
Maintenance
2008
10 000
10 000
2009
10 000
10 000
2010
10 000
10 000
2011
10 000
10 000
2012
10 000
10 000
Total
50 000
50 000Total
Funding Sources
Cable TV Fund
2008
10 000
10 000
2009
10 000
10 000
2010
10 000
10 000
2011
10 000
10 000
2012
10 000
10 000
Total
50 000
50 000Total
Operational ImpactOther I
This purchase will include a limited warranty In 2007 a major remodeling including camreas display screens AN control systems and Ch 8
management WaS undertaken Future upgrades include expanding access to programming to those without access to cable and continued
enhancement of the live and broadcast experience
29
Capital Improvement Program
City of Chanhassen MN
Irojfft EQ 028
I rojl ct anw Groundsmaster 580 Mower Replacement
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Park
Iriority n a
Totall roject Cost 82 000
Account 400 0000 4705 Account 3
Account 2
Description I
Provides for the replacement of an existing Toro 580 15 foot high volume grounds mower
Justification I
The City currently has 3 high production grounds mowers that cut a IS pass Each machine is used daily during the growing season and takes the
place of 2 1 2 smaller machines used by the City Due to additional park development an additional high capacity machine is needed
Expenditures
Equipment
2008 2009
82 000
82 000
2010 2011 2012 Total
82 000
82 000Total
Funding Sources
Capital Replacement Fund
2008 2009
82 000
82 000
2010 2011 2012 Total
82 000
82 000Total
Operational ImpactOther I
This purchase will include a limited warranty and reduce maintenance and repair expenses as compared to the unit replaced A so each of these
machines takes the place of2 2 smaller machines and makes the mowing operation 150 more efficient
30
Capital Improveme1lt Program
City of Cha1lhasse1l MN
Project EQ 029
Projl ct lame Light Duty Trucks Public Vorks
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Vehicles
Useful Life Unassigned
Category Street Equipment
Priority n a
Total Project Cost 64 000
Account 1 400 4120 4704 Account 3
Account 2
Description I
Provides for scheduled replacement of light duty trucks in the street and garage departments Replacement units are generally purchased early in
the year in order to accommodate the time frames established by Hennepin County and the State ofMN Cooperative Purchasing Program
2009 I 09 1995 Chevrolet 3 4 ton 4x4
2010 01996 Chevrolet 3 4 ton 4x4
Justification I
These vehicles are used for a variety of services throughout the community The average replacement age is 13 years These purchases are
consistent with the Vehicle Replacement Program
Expenditures
Vehicles
2008 2009
32 000
32 000
2010 2011
32 000
32 000
2012 Total
64 000
64 000Total
Funding Sources
Capital Replacement Fund
2008 2009
32 000
32 000
2010 2011
32 000
32 000
2012 Total
64 000
64 000Total
Operational ImpactOther I
These purchases will include a limited warranty and will reduce annual maintenance and repair costs as compared to the vehicles replaced
31
Capital Improvement Program
City of Chanhassen MN
Project EQ 031
I roj ct ame Sewer Bobcat Snow Accessories
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Improvement
Useful Life 10 15 years
Category Utilities
Priority nla
Total Project Cost 7 000
Account 1 700 0000 4705
Account 2 701 0000 4705
Account 3
Description I
The snowblower attachment is nearing its useful life and needs replacement
2009 NA 2007 Loftncss Snow Blower
Justification I
This equipment is necessary for cleaning snow from water and sewer locations
Expenditures
Equipment
2008 2009
7 000
7 000
2010 2011 2012 Total
7 000
7 000Total
Funding Sources
Water Utility Fund
2008 2009
7 000
7 000
2010 2011 2012 Total
7 000
7 000Total
Operational ImpactOther I
32
Capital Improvement Program
City of Chanhassen MN
Iroj cl EQ 034
Projl ct amc Grounds Mower Replacement
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Park
Priority nla
Total Project Cost 37 000
Account 1 400 0000 4705 Account 3
Account 2
Description I
Provides for replacement of lawn mowers
Justification I
With the amount of parkland consistently growing there is increased wear and tear on the City s lawn mowers They are 12 16 years old and are
not dependable Rebuilding is not cost effective This is consistent with the Equipment Replacement Program
Expenditures
Equipment
2008
37 000
37 000
2009 2010 2011 2012 Total
37 000
37 000Total
Funding Sources
Capital Replacement Fund
2008
37 000
37 000
2009 2010 2011 2012 Total
37 000
37 000Total
Operational ImpactOther I
This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the existing unit
33
Capital Improvemellt Program
City of Challhassell MN
2008 thrll 2012
Contact Unassigned
Department Major Equipment
Account I 400 4114 4703 Account 3
Type Equipment
Useful Life Unassigned
Category Administration
Priority n a
Project EQ 041
Project llmc Mailing Folder Inserter
Account 2
Total Project Cost 20 000
Description I
This is a replacement for the existing Folder Inserter in the Administration Department It is used for folding and mailing all city wide and smaller
bulk mailings It will be used more after the utility bill format is changed
Justification I
We are leasing the current machine with no option to purchase The cost is higher than the cost to lease a new machine with a purchase option for
a dollar at the end of the lease at a financing rate of 18 It makes more economic sense for us to purchase the machine at the city s cost of capital
of 6 and finance it over four or five years through the issuance of equipment certificates
Expenditures
Office Equipment
2008 2009 2010
20 000
20 000
2011 2012 Total
20 000
20 000Total
Funding Sources
Capital Replacement Fund
2008 2009 2010
20 000
20 000
2011 2012 Total
20 000
20 000Total
Operational ImpactOtller I
34
Capital Improvement Program
City of Cltanltassen MN
Project EQ 048
I roj ct Name Software Purchases
2008 thru 2012
Account 400 4117 4707 Account 3
Account 2
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life 5 7 years
Category Administration
Priority nla
Total Project Cost 153 500
Description I
This project funds the purchase of new software for all city departments that is not associated with a specific individual project Annual support
and license fees for existing software applications are funded outof account 1160 4300
Justification I
The major portion offunds requested for this project are for Microsoft software purchases In 2007 the city joined the Microsoft Office Enterprise
Aggreement for the State of Minnesota Microsoft Office is the standard desktop software application for all city users Participating in the state
aggreement allows the city to spread the cost of the product over a period of six years in which there are no additional fees for product upgrades
An add on module for the city s Springbook Software is proposed in 2008 to allow residents to check on their utility accounts and make electonic
payments Other software purchase requests in 2008 are for client access licenses for the new version of Windows server and for a mobile security
product for desktop pes
Expenditures
Office Equipment
2008
30 500
30 500
2009
42 000
42 000
2010
37 000
37 000
2011
22 000
22 000Total
2012
22 000
22 000
Total
153 500
153 500
Funding Sources
Capital Replacement Fund
2008
30 500
30 500
2009
42 000
42 000
2010
37 000
37 000
2011
22 000
22 000Total
2012
22 000
22 000
Total
153 500
153 500
Operational ImpactOther I
35
Capital Improvement Program
City of Chanhassen MN
l rojrct II EQ 049
Projcct lllllC Computerized Records Retention System
2008 thm 2012
Contact Unassigned
Drpartrnrnt Major Equipment
Type Equipment
Useful Life Unassigned
Category Administration
Priority nlaAccountI140041244703AccountI3
Account 112
Total Project Cost 61 000
Description I
This project originally funded the purchase of an electronic records retention system The project is now used to fund its expansion and the
replacement of scanning equipment which has a useful life expectancy of 3 to 5 years A large format color copier scanner printer is proposed to
replace the Ricoh 240W in 2009
Justification I
This system allows for quick and simultaneous retrieval of documents from any computer on the city network Both physical document storage
space and the occurrence of lost or misfiled documents will be significantly reduced In addition documents specified for public access can be
easily made available to residents and constituents from any internet capable computer Web Access a web based full scanning client engine is
proposed for 2008 This would replace the full clients which require a local client to be loaded on the end user workstation This would become
the standard user interface for both staff and public access This client will greatly enhance our ability to integrate documents in Laserfiche to
other application software It is anticipated that this will replace the Weblink product in use for staff and public read only access
Expenditures
Office Equipment
2008
12 700
12 700
2009
31 300
31 300
2010
8 000
8000
2011
9 000
9 000
2012 Total
61 000
61 000Total
Funding Sources
Capital Replacement Fund
2008
12 700
12 700
2009
31 300
31 300
2010
8 000
8 000
2011
9 000
9 000
2012 Total
61 000
61 000Total
Operational ImpactOther I
There is an annual license fee of 1 600 for the Laserfiche Web Access server which would be funded from the 116 4300 account
36
Capital Improvement Program
City of Chanhassen MN
Projrct EQ 052
Projl ct lfur Light Duty Trucks Parks
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Vehicles
Useful Life Unassigned
Category Park
Priority nla
Total Project Cost 196 000
Account 1 400 0000 4704 Account 3
Account 2
Description I
Provides for scheduled replacement of light duty trucks in the Park Maintenance Department
Justification I
These vehicles arc lIsed for multiple park maintenancer operations including towing mowers bobcat snowplowing sanding etc The average
replacement age of these vehicles is 135 yrs
Expenditures
Vehicles
2008
98 000
98 000
2009
33 000
33 000
2010 2011
65 000
65 000
2012 Total
196 000
196 000Total
Funding Sources
Capital Replacement Fund
2008
98 000
98 000
2009
33 000
33 000
2010 2011
65 000
65 000
2012 Total
196 000
196 000Total
Operational ImpactOtlter I
37
Capital Improvement Program
City of Chanhassen MN
Project EQ 054
Projl ct lIIllC Fire Vehicles
2008 thru 2012
Contllct Unassigned
Department Major Equipment
Type Vehicles
Useful Life 10 15 years
Category Fire
Priority nla
Total Project Cost 205 000
Account 1 400 4135 4704 Accou lit 3
Account 2
Description I
This item allows for the replacement of existing equipment Vehicles are purchased off either the Hennepin County or State of Minnesota
cooperative bid Orders are typically required to be placed up to one I year in advance of delivery
Justification I
As vehicles age they become less reliable Also they require more costly maintenance Vehicles proposed for replacement are
Unit 219 1988 chev I ton 2007 585 000
Unit 703 1999 Explorer 2008 540 000
Unit 207 1995 Astro Van 2009 540 000
Unit 706 1997 Expedition 20 I 0 40 000
Prior
85 000 I
Totnl
Expenditures
Vehicles
2008
40 000
40 000
2009
40 000
40 000
2010
40 000
40 000
2011 2012 Total
120 000
120 000Total
Prior
85 000 I
1 otOlI
Funding Sources
Capital Replacement Fund
2008
40 000
40 000
2009
40 000
40 000
2010
40 000
40 000
2011 2012 Total
120 000
120 000Total
Operational ImpactOther I
These purchases will include a limited warranty and will reduce the annual maintenance and repair costs The electrical work on the Aerial Truck
will correct an existing problem that has been a concern of the mechanics for some time
38
Capital Improvemellt Program
City of Cltallltassell MN
Projl ct EQ 055
Projl ct Namc Aerial Photography for City GIS Datasets
2008 thru 2012
Contact Unassigned
Dcpartmcnt Major Equipment
Account 1 400 0000 4752 Account 3
Type Improvement
Uscful Life 5 7 years
Catcgory Administration
Priority nla
Accollnt 2
Total Projcct Cost 119 500
Description I
This project funds the aerial photography for the integration with the city s existing GIS datasets This project is dependent upon the cooperation
of the Carver County GIS department This initial joint aerial flyover was conducted in April of 2005 and is scheduled to be re flown every three
years In 2008 the County will be purchasing an enterprise license for Pietometry a mapping product which provides three dimensional and
orthographic views along with a full featured mapping client By participating in the project the city will have unlimited access to the client and
dataset Additional funds arc being requested to assist with integrating the client to other existing city applications such as Laserfiche
Justification I
City Planners Engineers and Utility staff use this data in conjunction with other GIS datasets to help resolve geographical issues with residents
and contractors without repeated site visits It is used in nearly every scheduled staff meeting and has proven useful to the Sheriffs Office and fire
department when conducting area searches The Pictometry solution will also provide the ability for staff to view each side of buildings and
includes a toolset which allows for the accurate measurement of areas and lines
Expenditures
Maintenance
2008
32 000
32 000
2009 2010
43 000
43 000
2011 2012
44 500
44 500
Total
119 500
119 500Total
Funding Sources
Capital Replacement Fund
2008
32 000
32 000
2009 2010
43 000
43 000
2011 2012
44 500
44 500
Total
119 500
119 500Total
Operational ImpactOther I
39
Capital Improvemellt Program
City of Challhassell MN
Projrct EQ 056
Projl ct llnw Front End Loaders
2008 thru 2012
Contact Unassigned
Drpartmrnt Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
Priority nla
Total Project Cost 175 000
Account 1 400 0000 4705 Account 3
Account 2
Description I
This item replaces the front end loaders used in street maintenance This loader is used very frequently at the shop The loader was purchased in
197 and will be 36 years old at the time of trade in The loader is also used for plowing residential streets
2010 1321971920 Cat Loader
Justification I
The loader requires more frequent and expensive repairs Replacement parts are hard to find
Expenditures
Equipment
2008 2009 2010 2011
175 000
175 000
2012 Total
175 000
175 000Total
Funding Sources
Capital Replacement Fund
2008 2009 2010 2011
175 000
175 000
2012 Total
175 000
175 000Total
Operational ImpactOther I
40
Capital Improvemellt Program
City of Challhassell MN
Project EQ 061
Proj ct Namc Skidloader Planer
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Uscful Lifc Unassigned
Category Street Equipment
Priority n a
Total Project Cost 15 000
Account I 400 0000 4705 Accou nt 3
Account 2
Description I
This bobcat attachment is to be used for grinding out distressed pavement areas for patching This attachment is used extensively during the
summer to remove distressed pavement areas for patching
200S NA 1996 Bobcat planer mill
Justification I
This is necessary for effective pavement patching
Expenditures
Equipment
2008
15 000
15 000
2009 2010 2011 2012 Total
15 000
15 000Total
Funding Sources
Capital Replacement Fund
2008
15 000
15 000
2009 2010 2011 2012 Total
15 000
15 000Total
Operational ImpactOtlter I
41
Capital Improvement Program
City of Chanhassen MN
Projcct EQ 062
ProjlCl iamc Light Duty Trucks Utilities
2008 thm 2012
Account 1 700 0000 4704 2007
Account 2 70 00004704 2009
Account 3 701 0000 4704 20
Description I
This allows for replacement of existing vehicles in the Water and Sewer department
2009 319 1999 Dodge 3 4 ton 4x4
2009 309 973 Ford P500 Watermain break van
2011 302 J 999 Ford F 450 3 4 ton pickup
2012 3 17 997 Chevrolet 3 4 ton pickup
Contact Unassigned
Department Major Equipment
Type Vehie es
Useful Life Unassigned
Category Utilities
Priority nla
Total Project Cost 179 000
Justification I
This replaces pickups in accordance with the vehicle replacement plan
2010Expenditures
Vehicles
2008 2009
54 000
54 000
2011
70 000
70 000Total
2012
55 000
55 000
Total
179 000
179 000
Funding Sources
Sewer Utility Fund
2008 2009
54 000
54 000
2010 2011
70 000
70 000Total
2012
55 000
55 000
Total
179 000
179 000
Operational ImpactOther I
42
Capital Improvemellt Program
City of Challhassell MN
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Vehicles
Useful Life Unassigned
Category Administration
Priority nla
Total Project Cost 25 000
Project EQ 063
I rojl ct ame Administration Vehicle
Account I 400 0000 4704 Account 3
Account 2
Description I
This allows for replacement of an existing vehicle for City Hall
20 I 0 2 1993 Ford Taurus
Justification I
This replaces a vehicle in accordance with the vehicle replacement plan
Expenditures
Vehicles
2008 2009 2010
25 000
25 000
2011 2012 Total
25 000
25 000Total
Funding Sources
Capital Replacement Fund
2008 2009 2010
25 000
25 000
2011 2012 Total
25 000
25 000Total
Operational ImpactOther I
43
Capital Improvement Program
City of Chanhassen MN
Project EQ 065
Projl ct lame Engineering Vehicles
2008 thru 2012
Contact Unassigned
Dcpartment Major Equipment
Type Vehicles
Useful Life Unassigned
Category Street Equipment
Priority nla
Total Project Cost SS8 000
Account 1 400 0000 4704 Account 3
Account 2
Description I
The engineering van was purchased in 1995 and is used for engineering fieldwork and job site inspections
The Crown Victoria was purchased in 1993 and is used for general transportation for City Hall employees and site inspections
Justification I
These replacements are in accordance with the vehicle replacement plan
Expenditures
Vehicles
2008 2009 2010
58 000
58 000
2011 2012 Total
58 000
58 000Total
Funding Sources
Capital Replacement Fund
2008 2009 2010
58 000
58 000
2011 2012 Total
58 000
58 000Total
Operational ImpactOther I
44
Capital Improvement Program
City of Chanhassen MN
Project EQ 081
Projl ct Name Storage Area Network
2008 thru 2012
Contact
Department Major Equipment
Type Improvement
Useful Life 5 7 years
Category Administration
Account I 400 4126 4703 Account 3 Priority nla
Account 2
Total Project Cost 107 400
Description I
This project funds the purchase of a storage area network SAN which will gradually replace all internal disk drives in existing network servers
The storage area network is a central storage device made up of individual storage modules and managed from a single console The SAN allows
disk storage to be modified as storage needs change without any downtime for city users
Justification I
The need for digital storage space for city documentation and applications is growing at a rate of 50G8 to 100G8 per year Existing storage space
is becoming difficult to manage on individual network servers Internal storage utilization is inefficient and requires system downtime to
reconfigure SAN storage allows for real time reconfiguation as well as the ability to make real time copies for redundancy and for daytime backup
processes The initial San installation would reside in the server room at city hall Additional storage units would be added in later years at other
city buildings to facilitate disaster recovery A 1 8 Terabyte redundant SAN is proposed to be implemented in year one with a second single unit
added in years 2 and 3 As each unit is added the overall performance of the SAN as a whole is greatly increased
Expenditures
Equipment
2008
45 000
45 000
2009
20 800
20 800
2010
20 800
20 800
2011 2012
20 800
20 800
Total
107400
107 400Total
Funding Sources
Capital Replacement Fund
2008
45 000
45 000
2009
20 800
20 800
2010
20 800
20 800
2011 2012
20 800
20 800
Total
107400
107 400Total
Operational ImpactOther I
Software support is included for the first year Software support for the following years would be funded out of 116 4300 The hardware proposediscoveredunderathreeyearnextdaywarrantyHardwarerepairswouldbedonebyMISstaffusingasparekitandreplenishedbythewarranty
Spare parts required after the warranty expiration would be funded out of 116 4530
45
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Major Equipment
Project EQ 083
Projl ct Nllme CSO Truck
Type Vehicles
Useful Life
Account I 400 4129 4704 Account 3
Category Administration
Priority nla
Account 2
Total Project Cost 30 000
Description I
This allows for replacement of an existing CSO truck
Justification I
This replaces a vehicle in accordance with the vehicle replacement plan
Expenditures
Vehicles
2008 2009 2010
30 000
30 000
2011 2012 Total
30 000
30 000Total
Funding Sources
Capital Replacement Fund
2008 2009 2010
30 000
30 000
2011 2012 Total
30 000
30 000Total
Operational ImpactOther I
46
Capital Improvement Program 2008 thru 2012
City of Chanhassen MN
I Proj ct EQ 084
ProJlct Name Office
Account 1 Account 3
Accou nt 2
Description I
Provide for office furniture and chair replacements
Contact
Department Major Equipment
Type Unassigned
Useful Life
Category Administration
Priority n a
Total Project Cost 25 000
Justification I
This item will allow items to be replaced as they wear out or needs change
Expenditures
Office Equipment
2008
5 000
5 000Total
2009
5 000
5 000
2010
5 000
5 000
2011
5 000
5 000
2012
5 000
5 000
Total
25 000
25 000
Funding Sources
Capital Replacement Fund
2008
5 000
5 000Total
2009
5 000
5 000
2010
5 000
5 000
2011
5 000
5 000
2012
5 000
5 000
Total
25 000
25 000
Operational Imp t10tlter I
47
Capital Improvement Program
City of Chanhassen MN
Projcct EQ 085
Projl ct Name Standby Generator City Hall
2008 thnl2012
Contact
Department Major Equipment
Account 1 Account 3
Type Equipment
Useful Life 7 10 years
Category Administration
Priority n a
Account 2
Total Project Cost 130 000
Description I
This project funds the purchase of a standby generator for powering all of city Hall in emergency situations
Justification I
The current 5Kw standby generator which supplied power to the telephone system and the network server room is no longer functional Due to
both upgrades to the telephone system and network hardware it did not have the capacity to fully power these systems in full when functional A
l50Kw standby generator is being requested in order to supply power to all of City Hall in emergency situations City Hall has been designated as
the Emergency Operation Center for emergency events Standby power is neccessary to ensure this can be maintained in the event that outside
power is not available
Expenditures
Equipment
2008
130 000
130 000
2009 2010 2011 2012 Total
130 000
130 000Total
Funding Sources
Capital Replacement Fund
2008
130 000
130 000
2009 2010 2011 2012 Total
130 000
130 000Total
Operational ImpactOther I
Annual maintenance to be done by city utility shop staff
48
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Major Equipment
Account 1 Account 3
Typl Unassigned
Useful Lifl
Catlgory Fire
Priority nla
Project EQ 086
Projl ct NlllllC Equipment for New Fire Station
Account 2 Total Project Cost 1 000 000
Description I
Equipment for new satellite fire station to be built in 2010
Justification I
Response time from the other two stations will be unacceptable after Highway 212 is completed
Expenditures
Equipment
2008 2009 2010
1 000 000
1 000 000
2011 2012 Total
1 000 000
1 000 000Total
Funding Sources
Capital Replacement Fund
GO Bonds
2008 2009 2010
500 000
500 000
1 000 000
2011 2012 Total
500 000
500 000
1 000 000Total
I OperRIionoJ ImpotJOlher
49
Capital Improvement Program
City of Chanhassen MN
MB 003
2008 thru 2012
Contact Unassigned
Department Municipal Buildings
Type Improvement
Useful Life Unassigned
Category Street Equipment
Priority n a
Project
Project Name Public Vorks Facility Improvements
Account 1 Account 3
Accou nt 2
Total Project Cost 8 060 000
Description I
The existing Public Works facility is over capacity and is in need of major repairs The City is expected to grow an additional 30 before ultimate
build out The existing facility is located on a 5 acre site which is already cramped for storage and operation space The City completed a facility
needs study that recommended moving the Public Works building because the existing site is too small for expansion
Justification I
The Operations and Maintenance Department needs additional space for repairs meeting facilities files storage supervisory offices and proper
equipment storage In addition the current facility does not meet many City building codes
Expenditures
Planning Design
2008
8 060 000
8 060 000
2009 2010 2011 2012 Total
8 060 000
8 060 000Total
Funding Sources
GO Bonds
Sewer Utility Fund
Surface Water Utility Fund
2008
7 160 000
700 000
200 000
8 060 000
2009 2010 2011 2012 Total
7 160 000
700 000
200 000
8060 000Total
Operational ImpactOther I
This project would increase operational costs based on the percentage of the footprint expansion
50
Capital Improvement Program
City of Chanhassen MN
2008 thnt 2012
Contact Unassigned
Department Municipal Buildings
Account 1 400 4003 4702 Account 3
Type Improvement
Useful Life 20 years
Category Fire
Priority nla
Project MB 008
Projl ct Name Siding and Backing Replacement
Account 2
Total Project Cost 20 000
Description I
This project would be to replace the epoxy sealant on the bay floors at Station 2
Justification I
The West satellite station was originally built in 1980 Siding and roofing will be 30 years old The current siding is original It has some holes in
it and had some rotten spots replaced Currently we have a problem with bug infestation Replacement would also bring it up to the current code
Expenditures
Maintenance
2008 2009
20 000
20 000
2010 2011 2012 Total
20 000
20 000Total
Funding Sources
Capital Replacement Fund
2008 2009
20 000
20 000
2010 2011 2012 Total
20 000
20 000Total
Operational ImpactOther I
There should be no operational impact to this project
51
Capital Improvement Program
City of Chanhassen MN
Projrrt MB 009
I rojl ct amc Fire Station 3
2008 thru 2012
Contact Unassigned
Drpartment Municipal Buildings
Type Improvement
Useful Life 20 years
Category Fire
Priority nlaAccount14004143Account3
Account 2 Total Project Cost 2 000 000
Description I
This is for a possible fire station in the southern part of the city which will be developed after 2005
Justification I
Response time from the other two stations will be unacceptable after Highway 212 is completed
Expenditures
Construction
2008 2009 2010
2 000 000
2 000 000
2011 2012 Total
2 000 000
2 000 000Total
Funding Sources
GO Bonds
2008 2009 2010
2 000 000
2 000 000
2011 2012 Total
2 000 000
2 000 000Total
Operational ImpactOther I
The operational impact will be for the staffing and maintenance of personnel and equipment for the station once in place
52
Capital Improvement Program
City of Chanhassen MN
Project MB OIO
Project al11e City Hall Remodel
2008 thru 2012
Contact
Department Municipal Buildings
Type Improvement
Useful Life
Account 1 Account 3
Category Administration
Priority nla
Account 2
Total Project Cost 125 000
Description I
Remodel and refurbish areas of City Hall that need paint carpet or storage areas added
Jmt cmwn I
Certain areas of City Hall will be in need of some small repair and maintenance needs in 2010
Expenditures
Maintenance
2008 2009 2010 2011 2012
125 000
125 000
Total
125 000
125 000Total
Funding Sources
Capital Replacement Fund
2008 2009 2010 2011 2012
125 000
125 000
Total
125 000
125 000Total
Opermiollal ImpactOther I
53
Capital Improvement Program
City of Chanhassen MN
2008 thnt 2012
Contact
Department Municipal Buildings
Project MB 013
Proj ct lame Pioneer Cemetery Fencing and Landscaping
Type Improvement
Useful Life
Account 1 Account 3
Category Administration
Priority nla
Account 2 Total Project Cost 10 000
Description I
Construction of fencing and landscaping for the Pioneer Cemetery
Justification I
Expenditures
Construction
2008
10 000
10 000
2009 2010 2011 2012 Total
10 000
10 000Total
Funding Sources
Capital Replacement Fund
2008
10 000
10 000
2009 2010 2011 2012 Total
10 000
10 000Total
Operational ImpactOther I
54
Capital Improvement Program
City of Chanhassen MN
Project MB 014
Project Name City Hall North Parking Lot
2008 thru 2012
Contact
Department Municipal Buildings
Account 1 Account 3
Type Improvement
Useful Life
Category Streets Highways
Priority n a
Account 2
Description
Insta atlOn ot a 70 sta
District
Total Project Cost 280 000
Expenditures
Construction
2008 2009
280 000
280 000
2010 2011 2012 Total
280 000
280 000Total
Funding Sources
Assessment Revolving Assess
Other Agency Contribution
Total
2008 2009
140 000
140 000
280 000
2010 2011 2012 Total
140 000
140 000
280 000
I
55
Capital Improvemellt Program
City of Challhassell MN
2008 thrll 2012
Contact
Department Park Trail Improvements
Project PK T 029 Type Improvement
Useful Life 30 Years
Projl ct Nllme Hwy 101 North Trail Connection
Account 1 410 0000 47 0 Account 3
Category Park
Priority n a
Account 2
Total Project Cost 114 000
Description I
Construction of a I O foot wide pedestrian trail along the west side of Highway 101 from Pleasant View Road to Townline Road
Justification I
The last segment ofa trail that was originaly constructed in 2001
Expenditures
Construction
2008 2009
114 000
114 000
2010 2011 2012 Total
114 000
114 000Total
Funding Sources
Park Dedication Fund
2008 2009
114 000
114 000
2010 2011 2012 Total
114 000
114 000Total
Operational ImpactOther I
Overlay every 10 12 years
56
Capital Improvement Program
City of Chanhassen MN
Project PK T 042
Project lame Picnic Tables Park Benches
2008 thru 2012
Account 1 410 0004705
Account 2
Description I
Purchase of picnic tables and park benches
Account 3
Contact Unassigned
Dcpartment Park Trail Improvements
Type Improvement
Useful Life 10 15 years
Category Park
Priority nla
Total Project Cost 60 000
Justification I
New tables and benches are needed to replace old stock and meet new needs
Expenditures
Equipment
Total
2008
6 000
6 000
2009
6 000
6 000
2010
6 000
6 000
2011
6 000
6 000
2012
6 000
6 000
Total
30 000
30 000
Future
30 000 I
Total
Funding Sources
Park Dedication Fund
Total
2008
6 000
6 000
2009
6 000
6 000
2010
6 000
6 000
2011
6 000
6 000
2012
6 000
6 000
Total
30 000
30 000
Future
30 000 I
rotal
Operational ImpactOtlter I
57
Capital Improvement Program
City of Chanhassen MN
Proj cl PK T 043
Project amc Trees
2008 thrll 2012
Contact Unassigned
Dcpartm nt Park Trail Improvements
Type Improvement
Useful Life 50 Years
Account 1 410 0000 4701 Account 3
Category Park
Priority n a
Account 2
Description I
Annual tree planting program
Total Project Cost 50 000
Justification I
Planting trces is one of the best investments wc ean make in our future
Expenditures
Land Improvement
2008
5 000
5000
2009
5 000
5 000Total
2010
5 000
5 000
2011
5 000
5 000
2012
5 000
5 000
Total
25 000
25 000
Future
25 000 I
Total
Funding Sources
Park Dedication Fund
2008
5 000
5 000
2009
5 000
5 000Total
2010
5 000
5 000
2011
5 000
5 000
2012
5 000
5 000
Total
25 000
25 000
Future
25 000 I
rota
Operational ImpactOther I
58
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Park Trail Improvements
Account 410 0000 4710 Account 3
Type Improvement
Useful Life 30 Years
Category Park
Priority nla
Project PK T 047
Project anlC Arboretum Business Park Lot 12 Trail
Account 2
Total Project Cost 317 000
Description I
Construction of an 8 foot wide asphalt trail in the Chanhassen nature preserve
Justification I
Represents the tinal phase in a four part trail construction initiative
Expenditures
Land Improvement
2008
317 000
317 000
2009 2010 2011 2012 Total
317 000
317 000Total
Funding Sources
Park Dedication Fund
2008
317 000
317 000
2009 2010 2011 2012 Total
317 000
317 000Total
Operational ImpactOtlrer I
Maintenance and operations costs
59
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Park Trail Improvements
Project PK T 069 Typl Improvement
Useful Lifl 50 Years
Projl ct lame Hwy 41 Pedestrian Underpass Trail Grant Match
Account 1 410 0000 4706 Accou nt 3
Category Park
Priority nla
Account 2
Total Project Cost 5125 000
Description I
Carver County has applied for a federal grant to provide these improvements The city has supported the application pledging a 1 5 000
contribution if the full grant is received
Justification I
A pedestrian underpass to Minnewashta Regional Park is a highly sought after improvement
Expenditures
Construction
2008 2009 2010
125 000
125 000
2011 2012 Total
125 000
125 000Total
Funding Sources
Park Dedication Fund
2008 2009 2010
125 000
125 000
2011 2012 Total
125 000
125 000Total
Operational ImpactOther I
Maintenance and operations costs
60
Capital Improvement Program
City of Chanhassen MN
2008 111m 2012
Contact
Department Park Trail Improvements
Account I 4 J 0 000 4706 Account 3
Type Unassigned
Useful Life 25 years
Category Park
Priority n a
Project PK T On
Projl ct ilamc Tennis Court Repair
Account 2
Total Project Cost 50 000
Description
Patch and resurface courts
I
Justification I
We have deliberately limited the number of courts constructed within our system to lower overall maintenance costs associated with tennis courts
The courts we do offer are kept in playable condition through patching and resurfacing on a six to ten year cycle
Expenditures
Maintenance
2008 2009 2010
50 000
50 000
2011 2012 Total
50 000
50 000Total
Funding Sources
Park Dedication Fund
2008 2009 2010
50 000
50 000
2011 2012 Total
50 000
50 000Total
Operational ImpactOther I
Maintenance and operations costs
61
Capital Improvement Program
City of Chanhassen MN
2008 thrll 2012
Contact
Department Park Trail Improvements
I rojl ct PK T 075
Project lInw Liberty at Creekside Trail
Typl Unassigned
USl ful Life
ClItlgory Park
Account 1 Account 3 Priority nla
Accou nt 2
Totlll Project Cost 275 000
Description I
The Liberty at Creek side trail is a 2600 foot pedestrian trail improvement tied to the development of Liberty at Creek side This trail will be
situated in the Bluff Creek preservation corridor traveling from the castwest collector south to new Highway 212
Town and Country Homes is responsible for construction of this trail as a condition of their development contract with the city Upon completion
of the trail we will reimburse Town and Country Homes for the cost of the project materials
Justification I
This scction of trail is identified on the Cities comprehensive trail plan The City has an obligation to construct it concurrent with development of
the surrounding properties
Expenditures
Construction
2008 2009 2010 2011 2012
275 000
275 000
Total
275 000
275 000Total
Funding Sources
Park Dedication Fund
2008 2009 2010 2011 2012
275 000
275 000
Total
275 000
275 000Total
Operational ImpactOther I
Maintenance and operations costs
62
Capital Improvement Program
City of Chanhassen MN
Proj ct PK T 076
Project me The Preserve Trail and Bridge
2008 thru 2012
Contact
Department Park Trail Improvements
Type Unassigned
Us ful Life 50 Years
Category Park
Account Account 3 Priority nla
Accollnt 2
Total Project Cost 250 000
Description I
The Preserve trail is a 2800 foot pedestrian trail improvement tied to the development of the Preserve This trail will be situated in the Bluff Creek
preservation corridor travel ing from the east west collector road north to Lyman Boulevard A large bridge crossing of Bluff Creek will be the
signature component of this project Rottlund Homes is responsible for the construction of the trail and bridge as a condition of their development
contract with the City Upon completion of the trail we will reimburse Rottlund Homes for the cost of the project materials
Justification I
This section of trail is identified on the Cities comprehensive trail plan The City has an obligation to construct it concurrent with development of
the surrounding properties
Expenditures
Construction
2008
250 000
250 000
2009 2010 2011 2012 Total
250 000
250 000Total
Funding Sources
Park Dedication Fund
2008
250 000
250 000
2009 2010 2011 2012 Total
250 000
250 000Total
Operational ImpactOther I
Maintenance and operations costs
63
Capital Improvement Program
City of Chanhassen MN
PK T 077
2008 t17m 2012
Contact
Department Park Trail Improvements
Project 1 Type Unassigned
Useful Life 50 Years
Category Park
I rojl ct iamc Lakeside Trail Lyman Boulevard
Account 1 1 Account 1 3 Priority nla
Accou nt 112
Total Project Cost 60 000
Description I
The Lakeside Trail is a foot extension of a trail already in place along Lyman Boulevard This section will connect with a future trail in Eden
Prairie Sienna Corporation is responsible for the construction of the trail as a condition of their development contract with the City Upon
completion of the trail we will reimburse Sienna Corporation for the cost of the project materials
Justification I
This section of trail is identified on the Cities comprehensive trail plan The City has an obligation to construct it concurrent with development of
the surrounding properties
Expenditures
Construction
2008
60 000
60 000
2009 2010 2011 2012 Total
60 000
60 000Total
Funding Sources
Park Dedication Fund
2008
60 000
60 000
2009 2010 2011 2012 Total
60 000
60 000Total
Operational ImpactOther I
Maintenance and operations costs
64
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Park Trail Improvements
Project PK T 078 Type Unassigned
Useful Life 50 Years
I rojl ct amc 2005 MUSA Park Acquisition and Development
Account 1 Account 3
Category Park
Priority n a
Account 2
Total Project Cost 400 000
Description I
Acquisition and development of a neighborhood park in the 2005 MUSA area
Justification I
This acquisition satisfies a significant void in the Cities comprehensive park plan It will serve neighborhood park needs for over 500 homes
located with 2 mile of its location
Expenditures
Land Acquisition
2008 2009 2010 2011 2012
400 000
400 000
Total
400 000
400 000Total
Funding Sources
Park Dedication Fund
2008 2009 2010 2011 2012
400 000
400 000
Total
400 000
400 000Total
Operational ImpactOther I
Maintenance and operations costs
65
Capital Improvement Program
City of Chanhassen MN
2008 film 2012
Contact
Department Park Trail Improvements
I rojl ct PK T 079
rojlct l lnlC Recreation Center fitness Equipment
Type Unassigned
Useful Life
Category Park
Account 1 Account 3 Priority nfa
Account 2
Total Project Cost 50 000
Description I
Purchase of new fitness room equipment for the recreation center over the next five years
Justification I
The fitness room equipment has not been replaced since the opening of the center in 1995 The equipment is now 12 years old with many pieces
nearing or past their useful life expectancy
Expenditures
Equipment
2008
10 000
10 000
2009
10 000
10 000
2010
10 000
10 000
2011
10 000
10 000
2012
10 000
10 000
Total
50 000
50 000Total
Funding Sources
Capital Replacement Fund
2008
10 000
10 000
2009
10 000
10 000
2010
10 000
10 000
2011
10 000
10 000
2012
10 000
10 000
Total
50 000
50 000Total
Operational ImpactOther I
Maintenance costs will be reduced
66
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Park Trail Improvements
Project PK T 080
Projt ct anw Recreation Center Lobby Furniture
Type Unassigned
Useful Life
Account 1 Account 3
Category Park
Priority nla
Account 2
Total Project Cost 18 800
Description I
Purchase of new lobby furniture for the recreation center
Justification I
The existing furniture is original to the building s construction in 1995 After 12 years of use in a public recreation setting the existing furniture is
less than aesthetically pleasing
Expenditures
Equipment
2008
18 800
18 800
2009 2010 2011 2012 Total
18 800
18 800Total
Funding Sources
Capital Replacement Fund
2008
18 800
18 800
2009 2010 2011 2012 Total
18 800
18 800Total
Operational ImpactOther I
67
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Park Trail Improvements
Project II PK T 081 Type Improvement
Useful Life 30 Years
Projl ct llIllC Lyman Blvd Trail Improvements
Accou nt I 1 Accou nt 3
Category Park
Priority n a
Account 1 2
Totall roject Cost 500 000
Description I
Pedestrain trail and underpass improvements along Lyman Boulevard from Powers Boulevard to Highway 41
Justification I
Lyman Boulevard is scheduled for reconstruction The best time to construct trail improvements is concurrent with the road project
Expenditures
Construction
2008 2009
500 000
500 000
2010 2011 2012 Total
500 000
500 000Total
Funding Sources
Park Dedication Fund
2008 2009
500 000
500 000
2010 2011 2012 Total
500 000
500 000Total
Operational ImpactOther I
Maintenance and operations costs
68
Capital Improvemellt Program
City of Challhassell MN
2008 thru 2012
Contact
Department Park Trail Improvements
Account I Account 3
Type Improvement
Useful Life 20 years
Category Park
Priority nla
Projrct PK T 082
Irojlct Name Carver Beach Park Fishing Dock Extension
Accou lit 2
Total Project Cost 3 000
Description I
Extension of existing dock at Carver Beach Park
Justification I
The current dock section is too short and docs not allow for fishing
Expenditures
Equipment
2008
3 000
3 000
2009 2010 2011 2012 Total
3 000
3 000Total
Funding Sources
Park Dedication Fund
2008
3 000
3 000
2009 2010 2011 2012 Total
3 000
3 000Total
Operational ImpactOther I
69
Capital Improvement Program
City of Chanhassen MN
PK T 083
2008 thru 2012
Contact
Department Park Trail Improvements
Account 1 Account 3
Type Improvement
Useful Life 30 Years
Category Park
Priority nla
Project
Projl ct il ame Bluff Creek Drive Gap Trail
Account 2
Total Project Cost 350 000
Description I
Construction of a 10 foot wide pedestrian trail from south of Pioneer Trail to the southwest LRT trail head
Justification I
The Highway 212 improvement project included a pedestrain trail along the first 2000 feet of Bluff Creek Drive The resulting trail gap or
missing link should be completed
Expenditures
Construction
2008 2009
350 000
350 000
2010 2011 2012 Total
350 000
350 000Total
Funding Sources
Park Dedication Fund
2008 2009
350 000
350 000
2010 2011 2012 Total
350 000
350 000Total
Operational ImpactOther I
Maintenance and operations costs
70
Capital Improvement Program
City of Chanhassen MN
2008 thnt 2012
Contact
Department Park Trail Improvements
Account II 1 Account II 3
Type Improvement
Useful Life 30 Years
Category Park
Priority nla
P oject II PK T 084
Projl ct ame Pioneer Boulevard Gap Trail
Account 112
Total Project Cost 300 000
Description I
Construction of a 10 foot wide pedestrian trai I from Highway 101 to Powers Boulevard
Justification I
The Highway 212 improvement project included construction of a pedestrain trail along the majority of Pioneer Trail The remaining missing link
or gap betwccn Powers Boulcvard and Highway 10 should be completed
Expenditures
Construction
2008 2009
300 000
300 000
2010 2011 2012 Total
300 000
300 000Total
Funding Sources
Park Dedication Fund
2008 2009
300 000
300 000
2010 2011 2012 Total
300 000
300 000Total
Operational ImpactOther I
Maintenance and operations costs
71
Capital Improvemellt Program
City of Challhassell MN
rroi ct PK T 085
Project N lnw Disc Golf Course Contribution
2008 thru 2012
Contact
D Jlartrncnt Park Trail Improvements
AccoulIt 1 AccoulIt 3
Type Equipment
Useful Life 30 Years
Catcgory Park
Priority n a
AccoulIt 2
Total Project Cost 20 000
Description I
The city is seeking a partner to construct a disc golf course The city will provide the investment required to purchase equipment in the event that a
partnering entity has the land on which to build a course
Jt t cmwn I
Dise golf is a very popular activity with many teenage participants
Expenditures
Equipment
2008 2009 2010
20 000
20 000
2011 2012 Total
20 000
20 000Total
Funding Sources
Park Dedication Fund
2008 2009 2010
20 000
20 000
2011 2012 Total
20 000
20 000Total
Opermional ImpactOther I
72
Capital Improvement Program
City of Chanhassen MN
Project PK T 086
Projl Ct llmc Lake Ann Park Ballfield ShelterRestrooms
2008 hru 2012
Contact
Department Park Trail Improvements
Type Improvement
Useful Life 50 Years
Account 1 Account 3
Category Park
Priority n a
Account 2
Total Project Cost 750 000
Description I
Construction of a permanent ballfield shelter at Lake Ann Park The building will include a concessions room seating area storage utility room
viewing balcony and modern restrooms
Justification I
Lake Ann Park is one of two remaining community parks without a full service park building Activity levels at the parkjustify this capital
investment
Expenditures
Construction
2008 2009 2010 2011
750 000
750 000
2012 Total
750 000
750 000Total
Funding Sources
Park Dedication Fund
2008 2009 2010 2011
750 000
750 000
2012 Total
750 000
750 000Total
Operational ImpactOther I
Maintenance and operations costs
73
Capital Improvement Program
City of Chanhassen MN
Projl ct PL OO1
Projl ctillnlC Update of Comprehensive Plan
2008 111m 2012
Contact Unassigned
Department Planning
Type Improvement
Useful Life 10 15 years
Category Planning
Priority n a
Total Project Cost 30 000
Account 1 Account 3
Account 2
Description I
Update to city s 2020 Comprehensive Plan Start the process in 2007 and complete in 2008
Justification I
Mandated by State Statute that the comprehensive plan be updated every 10 years This is an opportunity to evaluate and re evaluate the city s land
use designation and MUSA staging infrastructure plan roads sewer storm wter water and parks and open space
Expenditures
Comp Plan Update
2008
30 000
30 000
2009 2010 2011 2012 Total
30 000
30 000Total
Funding Sources
General Fund
2008
30 000
30 000
2009 2010 2011 2012 Total
30 000
30 000Total
Operational ImpactOtller I
The update of the comprehensive provides additional information for capital improvements that may be needed to accommodate growth of the city
74
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Planning
Project PL 002
I rojl ct amc County Rd 61 old 212 Corridor Study
Type Improvement
Useful Life 10 15 years
Category Planning
Account 1 Account 3 Priority n a
Account 2
Total Project Cost 75 000
Description I
Corridor design along new County Road 61 and old State Highway 212
Justification I
The specific corridor study is an extension of the comprehensive plan identifing necessary improvements and developing configurements for
parcels along the right of way
Expenditures
Planning Design
2008 2009
75 000
75 000
2010 2011 2012 Total
75 000
75 000Total
Funding Sources
General Fund
2008 2009
75 000
75 000
2010 2011 2012 Total
75 000
75 000Total
Operational ImpactOther I
The corridor study will identify development potential and specific infrastructure improvements needed for development
75
Capital Improvemellt Program
City of Challhassell MN
88 012
2008 111111 2012
Contact Unassigned
Department Sanitary Sewer Improvements
Project Type Improvement
Useful Life Unassigned
Category Utilities
Projcct Namc Inflow and Infiltration Abatement
Anount 1 701 0000 4509 Account 3 Priority n a
An ount 2
Total Project Cost 800 000
Description I
This annual project includes televising repairs and rehabilitation of existing sanitary sewer The program also detects and eliminates points of
entry of ground water and surface water into the City sanitary sewer system Projects have been identified from the 2006 Inflow and Infiltration
Report The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees
Justification I
City staff has identified numerous older sewer lines that are in need of repair The City ofChanhassen pays the Metropolitan Council for sewage
treatment Those payments are based on the amount of flow generated by the City of Chanhassen Surface water and ground water that makes its
way into the system either through breaks displaced joints manhole covers or private connections to the system increase the amount charged to
the City for sewage disposal and increasing the load on the City s lift stations Also MCES may place a surcharge on cities that are not trying to
improve the inflow and infiltration problem
Expenditures
Maintenance
2008
200 000
200 000
2009
200 000
200 000
2010
200 000
200 000
2011
200 000
200 000
2012 Total
800 000
800 000Total
Funding Sources
Sewer Utility Fund
2008
200 000
200 000
2009
200 000
200 000
2010
200 000
200 000
2011
200 000
200 000
2012 Total
800 000
800 000Total
Operational ImpactOther I
The efforts may decrease operational costs emergency call outs and maintenance costs It is also the city s intent to use connection charges to helpfundforthosecostsItisthecitysbeliefthatasnewcustomerscomeonlinethoseconnectionfeesshouldhelpfundfutureinfiltrationproblems
76
Capital Improvement Program
City of Chanhassen MN
2008 111m 2012
Contact Unassigned
Department Sanitary Sewer Improvements
Account II 1 701 0000 475 Account 113
Type Improvement
Useful Life Unassigned
Category Utilities
Priority nla
Project 88 014
Projl ct aml Sanitary Sewer Replacement
Account 2
Total Project Cost 500 000
Description I
Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street
Justification I
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects
Expenditures
Construction
2008
250 000
250 000
2009 2010
250 000
250 000
2011 2012 Total
500 000
500 000Total
Funding Sources
Sewer Utility Fund
2008
250 000
250 000
2009 2010
250 000
250 000
2011 2012 Total
500 000
500 000Total
Operational ImpactOther I
This project will decrease maintenance costs
77
Capital Improvement Program
City of Chanhassen MN
Project SS 017
Project Name Sanitary Lift Station Rehabilitation Program
2008 thrll 2012
Contact Unassigned
Department Sanitary Sewer Improvements
Account 1 701 00004751 Accou nt 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n a
Account 2
Total Project Cost 681 000
Description I
The sanitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment
The City currently maintains 31 lift stations Many of these lift stations are high service pumps and need frequent servicing The program will
service or replace pumps pipe gallery and electrical components as needed The proposed lift stations for improvements are as follows
2008 4 5 6 and 2 2009 7 9 and 12 2010 8 and 24
20 II I 0 and II 2012 I 6 and 21
Justification I
Reduce emergency calls and potential sewer backups
Expenditures
Maintenance
2008
140 000
140 000
2009
76 000
76 000
2010
260 000
260 000
2011
105 000
105 000
2012
100 000
100 000
Total
681 000
681 000Total
Funding Sources
Sewer Utility Fund
2008
140 000
140 000
2009
76 000
76 000
2010
260 000
260 000
2011
105 000
105 000
2012
100 000
100 000
Total
681 000
681 000Total
Operational ImpactOther I
78
Capital Improvement Program
City of Chanhassen MN
2008 thrll 2012
Contact Unassigned
Department Sanitary Sewer Improvements
Account 1 701 0000 4751 Account 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n a
Project SS 018
Projl ct amc Dell Road77th Street Forcemain Replacement
Account 2
Total Project Cost 125 000
Description I
The forcemain on Dell Road and 77th Street that pumps the sewage from the industrial park has had several breaks in the past few years and needs
to be replaced This project will be included with the street improvements in 2009
Justification I
Eliminate emergency calls and sewer spills
Expenditures
Maintenance
2008 2009
125 000
125 000
2010 2011 2012 Total
125 000
125 000Total
Funding Sources
Sewer Utility Fund
2008 2009
125 000
125 000
2010 2011 2012 Total
125 000
125 000Total
Operational ImpactOtlter I
79
Capital Improvement Program
City of Chanhassen MN
Irojrct SS 020
Projl ct Nllnw 2010 MUSA Sanitary Lift Station
2008 thrll 2012
Contact
Department Sanitary Sewer Improvements
Type Unassigned
Useful Life
Account 1 701 0000 4702 Account 3
Category Unassigned
Priority nla
Account 2
Total Project Cost 2 200 000
Description I
This lift station will be located on Powers Boulevard south ofTH 212 to service the future 2010 MUSA area and will also be used by future
MUSA areas
Justification I
Required for future development of the 2010 MUSA area The cost will be assessed to future MUSA areas using connection fees
Expenditures
Construction
2008 2009 2010
2 200 000
2 200 000
2011 2012 Total
2 200 000
2 200 000Total
Funding Sources
Sewer Utility Fund
2008 2009 2010
2 200 000
2 200 000
2011 2012 Total
2 200 000
2 200 000Total
Operational ImpactOther I
80
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Dcpartment Sanitary Sewer Improvements
Project I SS 021
Projl ct llllle Lift Station 3 Standby Generator
Type Unassigned
Useful Life
Account 1 Account 3
Category Utilities
Priority n a
Account 2
Total Project Cost 80 000
Description I
Lift station 3 had improvements made to the station in 2007 These improvements included increasing the size of the wet well and a new pump
This lift station picks up 4 other smaller lift stations before discharging into the Metropolitan Council line It is critical this lift station be in
operation even ifpower is interupted A standby generator is recommended for this lift station for reliability The City has other standby
generators The City has 30 lift stations and it is difficult to operate all the lift stations with the City s few portable generators
Justification I
Increase reliability of lift station during power outages
Expenditures
Construction
2008
80 000
80 000
2009 2010 2011 2012 Tohll
80 000
80 000Total
Funding Sources
Sewer Utility Fund
2008
80 000
80 000
2009 2010 2011 2012 Total
80 000
80 000Total
Operational ImpactOther I
81
Capital Improvement Program
City of Chanhassen MN
Irojrct ST OOl
I rojlet lame West 78th St Streetlights
2008 thru 2012
Contact Unassigned
Department Street Improvements
Account I Account 3
TYPl Improvement
Useful Life Unassigned
Category Streets Highways
Priority n a
Account 2
Total Project Cost 300 000
Description I
Install street lights on West 78th Street from the Western edge of Lake Ann Park to Century Blvd Street lights already exist on the section of
West 78th Street cast of this section of road
Justification I
Visibility will be improved with the installation of street lights
Expenditures
Equipment
2008 2009 2010 2011 2012
300 000
300 000
Total
300 000
300 000Total
Funding Sources
MSA
2008 2009 2010 2011 2012
300 000
300 000
Total
300 000
300 000Total
Operational ImpactOther I
This project will increase maintenance and electrical usage costs
82
Capital Improvement Program
City of Chanhassen MN
ST 003Projrct
2008 thm 2012
Contact Unassigned
Department Street Improvements
Account 1
I rojlct Nanw Lyman Boulevard Improvements
Type Improvement
Useful Life Unassigned
Category
Priority n a
Account 2
Account 3
Total Project Cost 19 850 000
Description I
The city will need to participate in the reconstruction of Lyman Boulevard between Powers Boulevard and TH 41 The street segment is proposed
to be widened and urbanized to accommodate increased traffic volume from TH 212 new developments in the area and the new Chanhassen high
school Improvements include roadway widening signals stormsewer improvements trail improvement and trunk watermain improvement
Phase I 2008 Improvements include the roadway section from Galpin Blvd to Audubon south
Phase Il 20 I 0 Improvements are from Audubon south to Powers Blvd
Phase III 2012 Improvements are from Galpin Blvd to TH 41
Justification I
To improve safety and mobility along the corridor
Expenditures
Construction
Total
2008
8 950 000
8 950 000
2012
5 600 000
5 600 000
Total
19 850 000
19 850 000
Funding Sources
Arterial Collector Dvlpmnt Fee
AssessmenVRevolving Assess
MSA
Other Agency Contribution
Park Dedication Fund
Sewer Utility Fund
Surface Water Utility Fund
Water Utility Fund
2009 2010
5 300 000
5 300 000
2011
Total
1 250 000
400 000
3 577 000
11 673 000
850 000
100 000
1 500 000
500 000
19 850 000Total
Operational ImpactOther I
This project will increase maintenance costs in relation to the increase in City Utilities and Trails constructed with the project
2008 2009 2010 2011
250 000 1 000 000
400 000
1 243 000 490 000
5457 000 2 710 000
500 000 350 000
50 000 50 000
800 000 450 000
250 000 250 000
8 950 000 5 300 000
2012
1 844 000
3 506 000
250 000
5 600 000
83
Capital Improvement Program
City of Chanhassen MN
8T 012
2008 thru 2012
Contact Unassigned
Dcpartment Street Improvements
Account 601 0000 4751 Account 3
Type Improvement
Useful Life Unassigned
Category Streets Highways
Priority n a
Project
Projl ct iiame Annual Street Improvement Program
Account 112 Total Project Cost 14 436 000
Description I
Annual project to rehabilitate and reconstruct streets in the City Current 5 year plan shows the following neighborhood areas
Residential 2008 Laredo Dr Ln Longview Dr Cimarron Circle and Highland Drive
2009 Chaparral and Saratoga Dr Cir
20 I 0 Erie Ave area and Red Cedar Pt
20 II Carver Beach Rd area Sandy Hook Rd area Holly Ln Royal Oak Estates Crimson Bay Ches Mar and Timberwood
2012 Greenbriar Fir Tree Elm Tree Dogwood and Shore Drive
MSA 2009 Audubon Road Lyman Blvd to Lake Drive West
20 I 0 West 78th Street
Justification I
The City uses a Pavement Management System to monitor the condition of the City streets While proper preventative maintenance extends the
life of the street and is cost effective a street will eventually deteriorate to a point that further maintenance is no longer cost effective
Rehabilitation projects extend the life of the street In cases with utility or poor subgrade needs to be replaced or where streets have deteriorated to
a point where rehabilitation will no longer be practical reconstruction of the street is necessary A feasibility study is written to consider the merits
of the project and scope of work
Prior
I 4436 000 I
Total
Expenditures
Construction
2008
1 600 000
1 600 000
2009
3 500 000
3 500 000
2010
2 200 000
2 200 000
2011
1 200 000
1 200 000
2012
1 500 000
1 500 000
Total
10 000 000
10 000 000Total
Prior Funding Sources 2008 2009 2010 2011 2012 Total
I 4436 000 I AssessmentRevolving Assess 1 600 000 1 000 000 1 900 000 1 200 000 1 500 000 7 200 000
Total MSA 2 500 000 300 000 2 800 000
Total 1 600 000 3 500 000 2 200 000 1 200 000 1 500 000 10 000 000
Operational ImpactOther I
This project may decrease maintenance costs
84
Capital Improvement Program
City of Chanhassen MN
ST 017
2008 thru 2012
Contact Unassigned
Department Street Improvements
Accollnt II J 415 0000 4300 Accollnt II 3
Typ Improvement
Useful Life Unassigned
Category Streets Highways
Priority n a
Project
Projl ct al11e TH 101 Corridor Preservation Planning
Accollnt 112
Total Project Cost 500 000
Description I
A preliminary design environmental scoping study was completed in 2007 A study to complete the environmental assessment review for the
segment from Lyman Blvd to Pioneer Trail is scheduled for 2008 In 2010 a study to complete the environmental review is planned No funding
for improvements have been identified at this time
Justification I
To improve safety and mobility along the corridor and plan for future growth
Expenditures
PlanninglDesign
2008
200 000
200 000
2009 2010
300 000
300 000
2011 2012 Total
500 000
500 000Total
Funding Sources 2008 2009 2010 2011 2012 Total
MSA 50 000 50 000 100 000
Other Agency Contribution 150 000 250 000 400 000
Total 200 000 300 000 500 000
Operational ImpactOtlter I
85
Capital Improvemellt Program
City of Challhassell MN
2008 thru 2012
Contact Paul Oehme
Department Street Improvements
Type Maintenance
Useful Life 7 10 years
Category Streets Highways
Priority n a
Total Project Cost 2 3I 0 000
Project ST 018
Project 11111Pavement Management
Account I 420 0000 4751 Account 3
Account 2
Description I
This project will provide maintenance such as crack sealing seal coating pothole patching for city streets The projects will be determined
annually based on the pavement condition index as generated by the pavement management program
Justification I
This will provide a centralized funding mechanism that will help reduce the effect on General Fund operating expenditures
Prior
385 000 I
Tot 11
Expenditures
Maintenance
2008
385 000
385 000
2009
385 000
385 000
2010
385 000
385 000
2011
385 000
385 000
2012
385 000
385 000
Total
1 925 000
1 925 000Total
Prior Funding Sources 2008 2009 2010 2011 2012 Total
385 000 I MSA 117 125 117 125 117 125 117 125 117 125 585 625
Total Tax Levy 267 875 267 875 267 875 267 875 267 875 1 339 375
Total 385 000 385 000 385 000 385 000 385 000 1 925 000
Operational ImpactOther I
This will reduce the need to reconstruct streets and will allow us to more closely match the life of streets to the utility lines that lie underneath
them This will allow better coordination when we need to replace water and sewer lines with replacing roads
86
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Dcpartmcnt Street Improvements
Project ST 019 Type Unassigned
Uscful Life
Projl ct ame TH 5 Corridor Study TH 41 to TH 212 Catcgory Unassigned
Account I 415 0000 4300 Account 3 Priority n a
Account 2
Total Project Cost 10 000
Description I
This is a joint project between Carver County MnDot and the cities along the corridor to plan for future improvements and complete the
environmental and preliminary design The first phase of the environmental review is anticipated to be completed in 2008 The project
programmed for 2009 is anticipated to complete the environmental assessment
Justification I
This study is the first step in preliminary design and scoping to plan for improvements to the corridor The city s portion of the project will be used
for the segment between TH 4 I and the west city limits
Expenditures
Planning Design
2008 2009
10 000
10 000
2010 2011 2012 Total
10 000
10 000Total
Funding Sources
MSA
2008 2009
10 000
10 000
2010 2011 2012 Total
10 000
10 000Total
Operational ImpactOther I
87
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Street Improvements
Account 1 Account 3
Type Improvement
Uscful Life 7 10 years
Category Streets Highways
Priority n a
Proj cct ST 020
Projl ct lame Downtown Decorative Streetlights Signal Enhancemnt
Account 2
Total Project Cost 35 000
Description I
Most of the downtown decorative streetlights are not turned on because the bulbs are to bright and use too much power The decorative
streetlights and three signals west of Kerber Boulevard need painting The project is to paint all of the decorative downtown streetlights and three
signals and replace the bulbs in the streetlights to accent lighting
Justification I
To enhance the look of the downtown area
Expenditures
Construction
2008
35 000
35 000
2009 2010 2011 2012 Total
35 000
35 000Total
Funding Sources
AssessmentRevolving Assess
2008
35 000
35 000
2009 2010 2011 2012 Total
35 000
35 000Total
Operational ImpactOther I
88
Capital Improvement Program
City of Chanhassen MN
2008 111m 2012
Project SWMP 012
Project Name SWMP Implementation
Account 720 0000 4300 Account 3
Account 2
Contact Unassigned
Department Surface Water Management
Type Improvement
Useful Life Unassigned
Category SWMP
Priority nla
Total Project Cost 2 000 000
Description I
This project implements projects identified as high priority by the City s Surface Water Management Plan the National Pollutant Discharge
Elimination System NPDES Phase permit City Council andlor City staff
Justification I
These projects arc necessary to meet state and federal government requirements for storm drainage address storm water issues in existing
developments maintain existing infrastructure and construct the infrastructure recommended by the Citys Surface Water Management Plan
Expenditures
Construction
Prior
450 000 I
fotal
2008
350 000
350 000
2009
300 000
300 000
2010
300 000
300 000
2011
300 000
300 000Total
Prior
450 000 I
Total
Funding Sources
Surface Water Utility Fund
2008
350 000
350 000
2009
300 000
300 000
2010
300 000
300 000
2011
300 000
300 000Total
Operational ImpactOther I
Citywide No map
2012
300 000
300 000
Total
1 550 000
1 550 000
2012
300 000
300 000
Total
1 550 000
1 550 000
89
Capital Improvement Program
City of Chanhassen MN
Projcct II SWMP 014
Projl ct ame Property Acquisition
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Type Improvement
Useful Life Unassigned
Category SWMP
Account I 720 0000 4701
An ount 112 410 0000 4701
Account 3 Priority nla
Total Project Cost 850 000
Description I
The City will acquire property in accordance with its Comprehensive and Surface Water Management Plans
Justification I
Properties within thc City must bc acquircd in order to achievc the goals set forth in the Comprehensive and Surface Water Management Plans
Expenditures
Land Acquisition
2008
250 000
250 000
2009
100 000
100 000
2010
200 000
200 000
2011
200 000
200 000
2012
100 000
100 000
Total
850 000
850 000Total
Funding Sources
Surface Water Utility Fund
2008
250 000
250 000
2009
100 000
100 000
2010
200 000
200 000
2011
200 000
200 000
2012
100 000
100 000
Total
850 000
850 000Total
Operatiollal ImpactOther I
Citywide No map
90
Capital Improvemellt Program
City of Challhassell MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Accouut 1 720 0000 4702 Account 3
Type Improvement
Useful Life Unassigned
Category SWMP
Priority nla
Project SWMP 019
Projl ct ame Street Improvement Projects Storm Vater Mgmt
ACl ount 2
Total Project Cost 1 100 000
Description I
An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects
undertaken by the engineering and public works departments
Justification I
Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with
federal state and local regulations as well as protecting existing and proposed development adjacent to the projects
Expenditures
Construction
2008
400 000
400 000
2009 2010
300 000
300 000
2011 2012
400 000
400 000
Total
1 100 000
1 100 000Total
Funding Sources
Surface Water Utility Fund
Total
2008
400 000
400 000
2009 2010
300 000
300 000
2011 2012
400 000
400 000
Total
1 100 000
1 100 000
Operational ImpactOther I
Inventory inspection and maintenance of new infrastructure will be required Citywide No map
91
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Account 1 720 0000 4705 Account 3
Type Equipment
Useful Life 10 15 years
Category SWMP
Priority nla
Project SWMP 021
Project Nllllle Leaf Vacuum
Accou nt 2
Total Project Cost 40 000
Description I
Purchase ofa leaf vacuum trailer to address street sweeping requirements ofNPDES Phase II MS4 permit
Justification I
A leaf vacuum will be more effective at picking up leaves wet and dry from streets than a street sweeper This will prolong the life of the street
sweeper which is a more expensive piece of equipment The leaf vacuum also shreds leaves to increase productivity between dumping
Expenditures
Equipment
2008 2009 2010
40 000
40 000
2011 2012 Total
40 000
40 000Total
Funding Sources
Surface Water Utility Fund
2008 2009 2010
40 000
40 000
2011 2012 Total
40 000
40 000Total
Operational ImpactOther I
The collected material will have to be disposed of properly
92
Capital Improvement Program
City of Chanhassen MN
SWMP 022
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Project Type Equipment
Useful Life 10 15 years
Category SWMP
I rojlct amc Excavator
Account 1 720 0000 4705 Account 3 Priority nfa
Account 2 Total Project Cost 70 000
Description I
Purchase of a small excavator designed with rubber tracks to access storm water infrastructure for maintenance purposes Equipment will have a
boom capable of revolving 360 degrees
Justification I
The small size of this excavator will allow street crews to maintain infrastructure in small easements or in areas with limited access potential Light
weight minimizes damage to properties Revolving boom minimizes site disturbance Once inventory and inspection of stormwater infrastructure
has taken place it is anticipated that many ponds and drainageways will require maintenance to comply with NPDES Phase II
Expenditures
Equipment
2008 2009 2010
70 000
70 000
2011 2012 Total
70 000
70 000Total
Funding Sources
Surface Water Utility Fund
2008 2009 2010
70 000
70 000
2011 2012 Total
70 000
70 000Total
Operational ImpactOther I
93
Capital Improvemellt Program
City of Challhassell MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Project SWMP 023 Type Equipment
Useful Life Unassigned
Category SWMP
Projl ct amc Vactor Used
Account I 720 0000 4705 Account 3 Priority nla
Account 2
Total Project Cost 200 000
Description I
Purchase of a small vactor truck for maintenance of storm water infrastructure
Justification I
Development adds stormwater infrastrucure Currently street department shares equipment with utility department Utility department has
increased use of current vactor and streets department has increased need for additional vactor The small vactor will be used off road in easements
where the larger vactor cannot maneuver Also the small vaetor will be used on trails where the larger vactor should not go do due to damage it
caused to the bituminous trail due to its weight Will increase efficiency of SWMP cleanouts and other maintenance Will also serve as a backup
to current vactor in an emergency Will assist in achieving compliance with NPDES Phase MS4 permit
Expenditures
Equipment
2008 2009
200 000
200 000
2010 2011 2012 Total
200 000
200 000Total
Funding Sources
Surface Water Utility Fund
2008 2009
200 000
200 000
2010 2011 2012 Total
200 000
200 000Total
Operational ImpactOther I
The collected material will have to be disposed of properly
94
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Projrcl SWMP 024
Projl ct ame Bluff Cr Nat Resources Mgmt Plan Implementation
Account 1 720 0000 4751 Account 3
Account 2
Contact Unassigned
Department Surface Water Management
Type Improvement
Useful Life Unassigned
Category SWMP
Priority nla
Total Project Cost 900 000
Description I
Construction and restoration as recommended in the Bluff Creek Natural Resource Management Plan It is unknown how much funding the Riley
Purgatory Bluff Creek Watershed District will contribute to this project Will assist in achieving compliance with NPDES Phase II MS4 Permit
t cmwn I
Implementation of recommendations in 1996 Bluff Creek Natural Resource Management Plan in cooperation with the Riley Purgatory BluffCreek
Watershed District These projects will improve habitat and aesthetics in the Bluff Creek Watershed
Expenditures
Construction
Prior
150 000 I
Total
2008
150 000
150 000
2009
150 000
150 000
2010
150 000
150 000
2011
150 000
150 000Total
Prior
150 000 I
Total
Funding Sources
Surface Water Utility Fund
2008
150 000
150 000
2009
150 000
150 000
2010
150 000
150 000
2011
150 000
150 000Total
Opermiollal ImpactOtller I
The restored areas will require regular maintenance to sustain the native plant communities
2012
150 000
150 000
Total
750 000
750 000
2012
150 000
150 000
Total
750 000
750 000
95
Capital Improvement Program
City of Cltanltassen MN
Project SWMP 026
Projl ct lmc Lake Minnewashta Outlet
2008 thru 2012
Contact
Department Surface Water Management
Type Improvement
Useful Life
Category SWMP
Account I 720 0000 4751 Account 3 Priority n a
Account 2
Total Project Cost 30 000
Description I
Install a pcmlanent outlet structure at the outlet for Lake Minnewashta
Justification I
The current olltlet is sand and is therefore easily altered Alterations to the outlet can cause the entire lake to drain down to the outlet elevation
Expenditures
Construction
2008 2009 2010
30 000
30 000
2011 2012 Total
30 000
30 000Total
Funding Sources
Surface Water Utility Fund
2008 2009 2010
30 000
30 000
2011 2012 Total
30 000
30 000Total
Operational ImpactOther I
None
96
Capital Improvemellt Program
City of Challhassell MN
2008 thru 2012
Contact
Department Surface Water Management
Account 720 7202 4300 Account 3
Type Improvement
Useful Life
Category SWMP
Priority n a
Project SWMP 027
I rojlct llllle Natural Resources Stewardship Plan
Account 2
Total Project Cost 180 000
Description I
This project would develop and implement over time a stewardship plan for all public natural resources
Justification I
The plan is necessary to enhance and protect the city s public natural resource investments in land and vegetation The plan could prioritize
strategies sites and processes as well as inventory the existing conditions of publically held properties
Prior
50 000 I
Total
Expenditures
Planning Design
2008
50 000
50 000
2009
20 000
20 000
2010
20 000
20 000
2011
20 000
20 000
2012
20 000
20 000
Total
130 000
130 000Total
Prior
50 000 I
Total
Funding Sources
Reforestation
2008
50 000
50 000
2009
20 000
20 000
2010
20 000
20 000
2011
20 000
20 000
2012
20 000
20 000
Total
130 000
130 000Total
Operational ImpactOtlter I
97
Capital Improvemellt Program
City of Challhassell MN
Project SWMP 029
I rOjl ct llllle Landings Court Storm Vater Pond Imp
2008 thru 2012
Contact
Department Surface Water Management
Account 1 Account 3
Type Improvement
Useful Life
Category SWMP
Priority n a
Accou nt 2
Total Project Cost 70 000
Description I
This project addresses storm water quantity issues entering Lake Minnewashta This project was discussed with the City Council during the
Boulder Cove development application The improvements include ponding and additional storm water piping to the lake
Justification I
To help address erosion and reduce storm water discharge rates into Lake Minnewashta
Expenditures
Construction
2008
70 000
70 000
2009 2010 2011 2012 Total
70 000
70 000Total
Funding Sources
Surface Water Utility Fund
2008
70 000
70 000
2009 2010 2011 2012 Total
70 000
70 000Total
Operational ImpactOther I
98
Capital Improveme1lt Program
City of Cha1lhasse1l MN
2008 thru 2012
Contact
Department Surface Water Management
Project I SWMP 030
Projl ct llI1le Lake Susan Shoreline Restoration Improvements
Type Improvement
Useful Life
Category SWMP
Account I 1 Account 3 Priority n a
Acconnt 112
Total Project Cost 90 000
Description I
Residents around Lake Susan have requested the City ofChanhassen to repair shoreline erosion problems Restoration of the shoreline took place
at Lake Susan Park in 2006 The restoration under this project is similar in nature to the 2006 project The funding from Other Agency
Contributions will come from Water Shed District funds
Justification I
To reduce shoreline erosion
Expenditures
Construction
2008
90 000
90 000
2009 2010 2011 2012 Total
90 000
90 000Total
Funding Sources
Other Agency Contribution
Surface Water Utility Fund
2008
39 000
51 000
90 000
2009 2010 2011 2012 Total
39 000
51 000
90 000Total
Operational ImpactOther I
99
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Surface Water Management
Project SWMP 031 Type Improvement
Useful Life
Category SWMPProjcctlll1lCVestLotusLakeDrainageImprovements
Account 1 Account 3 Priority n a
Account 2
Totlll Project Cost 800 000
Description I
This improvement project addressess storm water quality and quantity issues in the Lotus Lake water shed In 2005 the regional pond over topped
causing significant damage down stream The storm water ponding in this area was discussed with the City Council during the review of the Lotus
Woods development The Water Shed District has made Lotus Lake a high priority in their capital improvement plan It is proposed the City work
jointly with the Water Shed District on this project The funding from Other Agency Contributions will come from Water Shed District funds
Justification I
To improve water quality and quantity in the Lotus Lake water shed
Expenditures
Construction
2008
400 000
400 000
2009
400 000
400 000
2010 2011 2012 Total
800 000
800 000Total
Funding Sources 2008 2009 2010 2011 2012 Total
Other Agency Contribution 200 000 200 000 400 000
Surface Water Utility Fund 200 000 200 000 400 000
Total 400 000 400 000 800 000
Operational ImpactOther I
100
Capital Improvement Program
City of Chanhassen MN
Project V 015
Projl ct iamc Repainting Vest 76th St Vater Tower
2008 thrtl2012
Contact Unassigned
Department Water System Improvements
Account 1 700 0000 4751 Account 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n a
Account 2 Total Projcct Cost 80 000
Description I
Provides for the recoating of the intcrior and extcrior surfaces of the W 76th St Water Tower The water tower is currently not uscd for water
storage because ofthc hydraulic changes that wcre made when thc Lake Lucy Road Powers Boulevard tower was made
Justification I
This type of infrastructure requires repainting to protect the metal structure so more costly repairs can be avoided
Expenditures
Construction
2008 2009
80 000
80 000
2010 2011 2012 Total
80 000
80 000Total
Funding Sources
Water Utility Fund
2008 2009
80 000
80 000
2010 2011 2012 Total
80 000
80 000Total
Operational ImpactOtlter I
This project does not increase operational costs
101
Capital Improvement Program
City of Chanhassen MN
2008 thrll 2012
Contact Unassigned
Department Water System Improvements
Account 1 Account 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n a
Project W 020
Projl ct Name Arboretum Vater Main
Account 2
Total Project Cost 220 000
Description I
Installation of a missing piece of water main to provide better looping and system reliability between the Arboretum Water Tower and W 78th
Street
Justification I
Completing this section of water main will complete a missing loop in the system providing improved water quality and pressure as well as
increasing operational reliability This project was identified in the 2003 Master Water Study
Expenditures 2008 2009 2010 2011 2012 Total
Planning Design 20 000 20 000
Construction 200 000 200 000
Total 220 000 220 000
Funding Sources
Water Utility Fund
2008 2009 2010
220 000
220 000
2011 2012 Total
220 000
220 000Total
Operational ImpactOther I
This project will increase maintenance costs
102
Capital Improvement Program
City of Chanhassen MN
Project W 024
Project lll1ll Vatermain Replacement
2008 thru 2012
Contact Unassigned
Department Water System Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Account 700 0000 4751 Account 3 Priority nla
ACl ount 2
Total Project Cost 2 060 000
Description I
Replacement of existing water main lines in coordination with the reconstruction of the City street
Justification I
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects and also to avoid potential cuts in recently improved streets If significant repairs are necessary to the existing water
main replacement may be the most cost effective option Given the highly corrosive soils in the City water main replacement is an ongoing
project in the City
Expenditures
Construction
2008
660 000
660 000
2009 2010
700 000
700 000
2011 2012
700 000
700 000
Total
2 060 000
2 060 000Total
Funding Sources
Water Utility Fund
2008
660 000
660 000
2009 2010
700 000
700 000
2011 2012
700 000
700 000
Total
2 060 000
2 060 000Total
Operational ImpactOther I
These projects will decrease maintenance costs
103
Capital Improvement Program
City of Chanhassen MN
W 025
2008 thru 2012
Contact Unassigned
Department Water System Improvements
Account 1 700 0000 4751 Account 3
TYPl Improvement
Useful Life Unassigned
Category Utilities
Priority nfa
Project
Projcct i llIllC Veil 4 Improvements
Account 2
Total Project Cost 350 000
Description I
Enginccring has reviewed the tcst data of the water from Well 4 and currently the radium levels are at the upper end of the MDH guidelines In
2004 staff reviewed the radium problems with thc Minncsota Dcpt of Health MDH The well is currently used as a peak well during high
demand pcriods which blends the Well 4 watcr with the other well water in the systcm If the radium levels continue to rise the City may have to
entcr into a monitoring program with the MDH on a tcmporary basis The MDH at that time will determine the acceptable amount of water that
can be pumped into the City systcm from Well 4 If an agreement with the MDH cannot be reached the well may have to be redeveloped capped
or have a small treatment plant built for this well Well 4 is also a high producer of iron and manganese Redevelopment of the well is budgeted
for 2009
Justification I
Well 4 continues to tcst high for RADIUM and is a high producer of iron and manganese which creates rusty water
Expenditures
Construction
2008 2009
350 000
350 000
2010 2011 2012 Total
350 000
350 000Total
Funding Sources
Water Utility Fund
2008 2009
350 000
350 000
2010 2011 2012 Total
350 000
350 000Total
Operational ImpactOtller I
This project will not increase operations cost
104
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact Unassigned
Department Water System Improvements
Account 1 700 0000 4751 Account 3
Type Improvement
Useful Life Unassigned
Category
Priority nla
Project W 027
I rojl ct Iamc Pressure Reducing Station 8
Account 2
Total Project Cost 215 000
Description I
Construction of a pressure reducing valve station in the 2005 MUSA area by Pioneer Trail is programmed for 2008 if the development along
Pioneer Trail is constructed Two pressure reducing stations are programmed for the 2010 MUSA area
Justification I
Identified in the 20 I 0 Comprehensive Water Supply Plan Needed to control watermain pressure due to elevation changes
Expenditures
Construction
2008
65 000
65 000
2009 2010
150 000
150 000
2011 2012 Total
215 000
215 000Total
Funding Sources
Water Utility Fund
2008
65 000
65 000
2009 2010
150 000
150 000
2011 2012 Total
215 000
215 000Total
Operational ImpactOther I
This project will increase maintenance costs
105
Capital Improvement Program
City of Chanhassen MN
Proj ct W 030
Projcct lInle Raw ell Vater Collection System
2008 thrll 2012
Contact Unassigned
Dcpartment Water System Improvements
Account 1 700 0000 4751 Accou nt 3
Typc Improvement
Uscful Life Unassigned
Cat gory
Priority nla
Account 2
Total Project Cost 500 000
Description I
This project includes designing and installing watermain from new and existing well sites to the phase II treatment plant at the west end of the city
Justification I
Raw water lines are required to feed the water directly from the wells to the treatment plant prior to distribution to the water system These
imporvements were identified in the 2003 Master Water Plan
Expenditures
Construction
2008 2009 2010 2011 2012
500 000
500 000
Total
500 000
500 000Total
Funding Sources
Water Utility Fund
2008 2009 2010 2011 2012
500 000
500 000
Total
500 000
500 000Total
Operational ImpactOther I
This project will increase maintenance costs
106
Capital Improvement Program
City of Chanhassen MN
2008 thm 2012
Project V 032
I rojlct Nanll ell Rehabilitation Program
Account I 700 00004530 Aecount 3
Account 2
Contact Unassigned
Department Water System Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Priority nfa
Total Project Cost 255 000
Description I
This program annually inspects and performs regular maintenance of the City s wells Well pumps are recommended to be serviced every 8 years
In 2008 it is recommended that the pumps in wells 2 and 3 be lowered because of the drop in the aquifer levels
Justification I
To extend the life and ensure reliability of the City s well fields Performing regular maintenance will extend the life of well components reduce
emergency calls and have a more reliable water supply system
Expenditures
Maintenance
2008
80 000
80 000
2009
40 000
40 000
2010
45 000
45 000
2011
45 000
45 000Total
2012
45 000
45 000
Total
255 000
255 000
Funding Sources
Water Utility Fund
2008
80 000
80 000
2009
40 000
40 000
2010
45 000
45 000
2011
45 000
45 000Total
2012
45 000
45 000
Total
255 000
255 000
Operational ImpactOtller I
107
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Water System Improvements
Account 1 Account 3
Type Improvement
Useful Life
Category Utilities
Priorit n a
Project V 037
Projectlame Vest Vater Treatment Plant
Account 2 Total Project Cost 11 000 000
Description I
The treatment of potable water for the high zone area and the west side of town is planned for construction in 2012 This treatment plant along
with the east treatment plant will treat the city s potable water for an average day s usage
Jl t cmwn I
To remove iron and manganese from the water prior to distributing
Expenditures
Construction
2008 2009 2010 2011 2012
11 000 000
11 000 000
Total
11 000 000
11 000 000Total
Funding Sources
Revenue Bonds
2008 2009 2010 2011 2012
11 000 000
11 000 000
Total
11 000 000
11 000 000Total
Opermional ImpactOther I
108
Capital Improvemellt Program
City of Challhassell MN
Project v 038
Project lime Stand by Generator for wells
2008 thru 2012
Contact
Department Water System Improvements
Type Unassigned
Useful Life
Category Unassigned
Account I 700 0000 4705 Account 3 Priority n a
An ount 2
Total Project Cost 120 000
Description I
With the addition of the water treatment plant standby generation for wells is needed to keep water supplied to the treatment plant The treatment
plant has a standby generator for the plant but only one well The requested standby generator will be able to run an additional two wells This
will allow the plant to treat water to meet an average day demand
Justification I
To meet average day water demand for the eity ifpower is disrupted for an extended period of time
Expenditures
Equipment
2008
120 000
120 000
2009 2010 2011 2012 Total
120 000
120 000Total
Funding Sources
Water Utility Fund
2008
120 000
120 000
2009 2010 2011 2012 Total
120 000
120 000Total
Operational ImpactOther I
109
Capital Improvement Program
City of Chanhassen MN
Project v 039
Projl ct amc Audubon South Vatermain Loop
2008 thru 2012
Contact
Department Water System Improvements
Type Unassigned
Usdul Life
Account Account 3
Category Utilities
Priority nla
Account 2
Total Project Cost 150 000
Description I
This watermain project will extend watermain from the intersection of Lyman Blvd and Audubon south along Audubon to connect to the Liberty
on Bluff Creek development Service will be provided to the existing homes along Audubon
Justification I
To service existing homes along Audubon and profice a watermain loop for properties in the area To provide a loop watermain system for the area
Expenditures
Construction
2008
150 000
150 000
2009 2010 2011 2012 Total
150 000
150 000Total
Funding Sources
AssessmenVRevolving Assess
Water Utility Fund
2008
20 000
130 000
150 000
2009 2010 2011 2012 Total
20 000
130 000
150 000Total
Operational ImpactOtller I
110
Capital Improvement Program
City of Chanhassen MN
Project II W 040
Projl ct lInc Repaint Melody Hills Water Tower
2008 thrl 2012
Contact
Department Water System Improvements
Type Unassigned
Useful Life
Account II I Account II 3
Category Utilities
Priority n a
Account 112 Total Project Cost 300 000
Description I
Provides for the recoating of the interior and exterior surfaces of the Melody Hills water tower
Justification I
Steel water towers require recoating to protect the metal and to prevent more costly repairs
Expenditures
Construction
2008 2009
300 000
300 000
2010 2011 2012 Total
300 000
300 000Total
Funding Sources
Water Utility Fund
2008 2009
300 000
300 000
2010 2011 2012 Total
300 000
300 000Total
Operational ImpactOther I
111
Capital Improvement Program
City of Chanhassen MN
Proj ct V 041
Projl ct ame Repaint Lake Lucy Vater Stand Pipe
2008 thru 2012
Contact
Department Water System Improvements
Type Unassigned
Useful Life
Category Utilities
Account 1 Account 3 Priority n a
Account 2
Total Projcct Cost 550 000
Description I
This project will repaint the interior and exterior surfaces of the Lake Lucy stand pipe
Justification I
Steel tanks require recoating to protect the metal to prevent more costly repairs
Expenditures
Construction
2008 2009 2010
550 000
550 000
2011 2012 Total
550 000
550 000Total
Funding Sources
Water Utility Fund
2008 2009 2010
550 000
550 000
2011 2012 Total
550 000
550 000Total
Operational ImpactOtlter I
112
Capital Improvement Program
City of Chanhassen MN
2008 thrll 2012
Contact
Department Water System Improvements
Account 1 Account 3
Type Unassigned
Useful Life
Category Utilities
Priority n a
Project V 042
Proj ct i lIllC High Zone Elevated Storage Tank
Account 2
Total Project Cost 1 850 000
Description I
Based on current and projected system demands the high zone should have additional storage capacity The 2008 water comprehensive plan
recommends a total of750 000 gallons for storage Currently the high zone only has 200 000 gallons of storage
Justification I
To meet current and future water demands for the high zone area and to meet recommended fire flow storage requirements
Expenditures
Construction
2008 2009 2010
1 850 000
1 850 000
2011 2012 Total
1 850 000
1 850 000Total
Funding Sources
Water Utility Fund
2008 2009 2010
1 850 000
1 850 000
2011 2012 Total
1 850 000
1 850 000Total
Operatiollal ImpactOther I
113
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Irojrct II W 043
Projl ct ame Vell 14 Improvements
Account II 1 Account II 3
Account 112
Description I
This well is proposed to meet the water needs of the growing community
Contact
Department Water System Improvements
Type Improvement
Useful Life
Category Utilities
Priority nla
Total Project Cost 1 200 000
Justification I
To meet the growing water needs of the city
Expenditures
Construction
2009 2012 Total
1 200 000
1 200 000
2008
Total
2010 2011
1 200 000
1 200 000
Funding Sources
Water Utility Fund
2008 2009
Total
2010 2011
1 200 000
1 200 000
2012 Total
1 200 000
1 200 000
Operational ImpactOther I
114
Capital Improvement Program 2008 thru 2012
City of Chanhassen MN
Projcct W 044
Projl ct amc Veil 13
Contact
Dcpartmcnt Water System Improvements
Type Unassigned
Uscful Life
Account I Account 3
Catcgory Utilities
Priority nla
Account 2
Total Projcct Cost 1 200 000
Description I
This well is proposed to replace the lost capacity of well 6
Justification I
To meet the peak summer irrigation demands of the city
Expenditures
Construction
2008
1 200 000
Total 1 200 000
2009 2010 2011 2012 Total
1 200 000
1 200 000
Funding Sources
Water Utility Fund
2008
1 200 000
Total 1 200 000
2009 2010 2011 2012 Total
1 200 000
1 200 000
Operational ImpactOther I
115
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Water System Improvements
Account Account 3
Typl Unassigned
Useful Life
Category Utilities
Priority n a
Project W 045
I rojlct lIme Vest Junior High School ell
Accou lit 2 Total Project Cost 715 000
Description I
This improvcmcnt will convcrt thc school well from a stand by well into a regular producing municipal well Currently the well can only produce
250 gpm It is anticipated the wcll could produce as much as 800 gpm The project consists of a new submersible pump and using some electrical
components from wcll 5 that are anticipated to be dccommissioned A new water main is necessary to be extended to well 7 well house for
chcmical treatmcnt Valvc improvcments are also anticipated to have the ability to bleed this water out of the high zone pressure area
Justification I
To mect thc currcnt watcr dcmand of the city
Expenditures
Construction
2008
715 000
715 000
2009 2010 2011 2012 Total
715 000
715 000Total
Funding Sources
Water Utility Fund
2008
715 000
715 000
2009 2010 2011 2012 Total
715 000
715 000Total
Operational ImpactOther I
116
Capital Improvement Program
City of Chanhassen MN
2008 thrll 2012
Contact
Department Water System Improvements
Account I I Account I 3
Type Unassigned
Useful Life
Category Utilities
Priority n a
Project I V 046
Project llIllC Low Zone 1 million gallon Elevated Storage Tank
Account 12
Total Project Cost 2 500 000
Description I
This tank is needed to meet the peak day and potential emergency demand for the growth of the community
Justification I
To meet peak demand and emergency water demand for the growing community
Expenditures
Construction
2008 2009 2010 2011
2 500 000
2 500 000
2012 Total
2 500 000
2 500 000Total
Funding Sources
Water Utility Fund
2008 2009 2010 2011
2 500 000
2 500 000
2012 Total
2 500 000
2 500 000Total
Operational ImpactOtlter I
117
Capital Improvement Program
City of Chanhassen MN
2008 thru 2012
Contact
Department Water System Improvements
Account I Account 3
Type Unassigned
Useful Life
Category Utilities
Priority ilia
Project W 047
Projl ct Name Veil 12 Improvements
Account 2
Total Project Cost 940 000
Description I
This well is proposed to replace the lost capacity of Well 5
Justification I
To mcet the peak summer irrigation demands of the city
Expenditures
Construction
2008
940 000
Total 940 000
2009 2010 2011 2012 Total
940 000
940 000
Funding Sources
Water Utility Fund
2008
940 000
Total 940 000
2009 2010 2011 2012 Total
940 000
940 000
Operational ImpactOtlter I
118
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952227 1110
Web Sile
www ci chanhassen mn us
a
MEMORANDUM
TO Mayor and City Council
FROM Todd Gerhardt City Manager
o
November 26 2007DATE
SUBJ Discussion of City Manager s Performance Review Process
Each year at this time the City Council discusses the City Manager s Performance
Review Process I have attached my Annual Work Plan that gives an
outline update of this year s annual goals Key Financial Strategies and
accomplishments for 2007 At the conclusion of our last work session item the
City Council would go into Executive Session to discuss the 2007 review process
g admin tg work plan cc memo 11 26 07 1doc
The City ot Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play119
120
CHANHASSEN CITY COUNCIL
WORK SESSION
NOVEMBER 13, 2007
Mayor Furlong called the work session to order at 5:30 p.m..
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Litsey, Councilwoman
Ernst, Councilwoman Tjornhom, and Councilman Peterson
STAFF PRESENT: Todd Gerhardt, Laurie Hokkanen, Greg Sticha, Paul Oehme, Todd
Hoffman, Richard Rice, Kelley Janes, and Danielle Washburn
UTILITY RATE DISCUSSION, EHLERS AND ASSOCIATES.
Greg Sticha reviewed the different fees for water, sanitary sewer and storm sewer, explaining
what each fee is used for. Staff is recommending that the council approve going from a 2 tier
system to a 4 tier rate system as a means of promoting water conservation. Jessica Cook from
Ehlers and Associates gave an update on the goals for the utility system, and reviewed the water,
sanitary sewer funds, and operating and trunk funds. She reviewed the assumptions used in the
study taking into consideration growth, capital improvements and construction of the west water
treatment plant between 2008 and 2020 and explained now the water and sanitary sewer rates for
2006 through 2011 will be based on quarterly water usage fees per 1,000 gallons.
Councilwoman Ernst asked for clarification of the timeline and funding for construction of new
wells in 2008 versus 2012. Councilwoman Tjornhom asked which users, commercial vs.
residential, would be more greatly impacted by the 4 tier system. Mayor Furlong asked for
clarification on the irrigation meter usage costs in the 4 tiered system and what has been built in
for subsequent growth rates. Councilman Litsey asked why staff picked 4 tiers versus any other
number of tiers. Greg Sticha showed specific examples of how the new tiered rates will affect
the individual's water bill. Councilwoman Ernst asked for the worst case scenario if rates aren't
increased. Mayor Furlong asked for clarification on the dollar amount assigned to the number of
gallons used. Jessica Cook continued with her presentation recommending an increase in hook
up fees for sewer and water, showing a graph of cash balances for 2005 through 2020 for the
trunk water and sewer trunk funds, while explaining the assumptions used for growth and capital
improvements. She reviewed the recommended 2007 storm water rate increases, while showing
storm water cash balances, noting she will keep an eye on growth and will adjust timing of
projects in the future accordingly. Greg Sticha asked for council direction on the rate increases
noting the item will be on the December 10th City Council agenda. All city council members
were in support of the user fee system. Todd Gerhardt explained how the city will assist in
educating the public on conservation measures. Mayor Furlong thanked staff and Jessica Cook
for their long term vision in assisting planning for the future. Paul Oehme explained how the
city will educate and notify residents of the billing changes.
2008 BUDGET:
Laurie Hokkanen presented the 2008 budget proposal for the Administration Department
showing 2007 versus 2008 expenditures and proposed 10% cuts. Greg Sticha presented the 2008
121
City Council Work Session - November 13, 2007
2
budget for the finance department, showing how total expenditures have decreased due to a
retirement in the department. He reviewed the audit and accounting services under contractual
services and the proposed 10% cuts.
The work session was recessed at 7:00 p.m. and reconvened at 7:30 p.m..
2008 BUDGET CONTINUED.
Paul Oehme presented the 2008 budget for the public works and engineering department,
showing 2007 versus 2008 expenditures and proposed 10% cuts. Councilman Peterson asked
about conservation measures being taken with city street lights.
UPDATE ON LYMAND BOULEVARD.
Todd Gerhardt provided background information on the Master Road Agreement that the City
has with Carver County and how the use of TIF dollars were used to fund road improvements
other than Lyman Boulevard. Paul Oehme discussed the timing of phases for construction, with
Phase I being done in conjunction with the opening of the new Chanhassen High School and cost
saving measures that will be used. Councilman Peterson asked about the use of round abouts in
the road design. Mayor Furlong asked about railroad crossing safety in conjunction with traffic
associated with the high school. Paul Oehme explained funding proposals for the city's portion
and where the money will come from and reviewed the timing for Phases I, II and III. Mayor
Furlong asked about a storm water pond on the Holasek property as a cost sharing structure
associated with the road project and city project.
UPDATE ON INFILTRATION/INFLOW PROJECTS.
Paul Oehme presented a power point presentation on the Infiltration/Inflow (I/I) projects for
2007 reviewing definitions, the Met Council's I/I surcharge program highlights, Chanhassen's I/I
sources and the 2006/07 city projects used to televise and repair sewer lines in the city. Mayor
Furlong noted the city needs to address and identify the source and provide solutions to the
grease deposits in the downtown area. Councilman Peterson asked about materials used by
cities, counties and state for pipeline construction. Paul Oehme continued with review of the
2006/07 Met Council sewer televising and repair program, noting the City is looking for a
$58,700 surcharge credit from the Metropolitan Council for repair of their pipe. Councilman
Peterson asked if Met Council televises their lines. Mayor Furlong asked about the level of
cooperation the city is receiving from the Met Council on the surcharge credit versus the money
spent for repairs. Kelley Janes explained how the Met Council monitors I/I from one end of the
city to the other.
Mayor Furlong adjourned the work session meeting at 8:55 p.m..
Submitted by Todd Gerhardt
City Manager
Prepared by Nann Opheim
122
CHANHASSEN CITY COUNCIL
REGULAR MEETING
SUMMARY MINUTES
NOVEMBER 13, 2007
Mayor Furlong called the meeting to order at 7:05 p.m.. The meeting was opened with the
Pledge to the Flag.
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Litsey, Councilwoman
Ernst, Councilwoman Tjornhom, and Councilman Peterson
STAFF PRESENT: Todd Gerhardt, Elliott Knetsch, Laurie Hokkanen, Greg Sticha, Paul
Oehme, and Todd Hoffman
PUBLIC PRESENT FOR ALL ITEMS:
Morgan Ische 2383 Manuela Drive
JoAnne Lewellen 6340 Murray Hill Road
John Deluca 6484 Murray Hill Road
Ken Wencl 8412 Waters Edge Drive
PUBLIC ANNOUNCEMENTS: At the applicant's request item 2, a metes and bounds
subdivision at 6444 Murray Hill Road, Gilbert and Jillene Kreidberg was pulled from the agenda
and rescheduled for the November 26th meeting.
CONSENT AGENDA: Councilman Litsey moved, Councilwoman Ernst seconded that the
City Council approve the following consent agenda items pursuant to the City Manager's
recommendations:
a. Approval of Minutes:
-City Council Work Session Minutes dated October 22, 2007
-City Council Verbatim and Summary Minutes dated October 22, 2007
Receive Commission Minutes:
-Planning Commission Verbatim and Summary Minutes dated October 16, 2007
-Park and Recreation Commission Verbatim and Summary Minutes dated October 23,
2007
c. Resolution #2007-66: Lake Riley Woods Channel Stabilization Project, SWMP 12-
035B: Award Contract.
d. Resolution #2007-67: Approval of Acquisition of Tax Forfeited Property on Powers
Boulevard.
e. Resolution #2007-68: SCBA Equipment (Breathing Apparatus) for the Fire Department:
Award of Bid.
123
City Council Summary - November 13, 2007
2
f. Resolution #2007-69: Final Plat Approval, Life Time Fitness Second Addition.
g. Resolution #2007-70: Accept Street & Utility Improvements in Walnut Grove 2nd
Addition, Project 04-09.
h. Accept $1,000 Donation to the Fire Department from Spartan Chassis, Inc.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
VISITOR PRESENTATIONS: Ken Wencl invited council members to attend a meeting on
Tuesday, November 27th at the American Legion where two doctors will report on their findings
from a carp study being conducted on Lake Riley, Rice Marsh Lake and Lake Susan. Mayor
Furlong introduced Jim Keeler who's been appointed the new Carver County Attorney to speak.
Jim Keeler provided background information on his personal and professional experience in
Chanhassen and Carver County.
COUNCIL PRESENTATIONS: Mayor Furlong reported on the 3 day summit he attended in
Madison, Mississippi, along with mayors from the other 8 cities named by Family Circle
Magazine as the best towns to raise a family in America.
ADMINISTRATIVE PRESENTATIONS: Todd Gerhardt gave an update on the progress of
road projects in the city.
CORRESPONDENCE DISCUSSION. None.
Before adjourning the meeting, Councilman Peterson asked Elliott Knetsch to comment on how
the system has been working with the Carver County Attorney's office and court system.
Councilman Peterson moved, Councilwoman Ernst seconded to adjourn the meeting. All
voted in favor and the motion carried. The meeting was adjourned at 7:20 p.m..
Submitted by Todd Gerhardt
City Manager
Prepared by Nann Opheim
124
CHANHASSEN CITY COUNCIL
REGULAR MEETING
NOVEMBER 13, 2007
Mayor Furlong called the meeting to order at 7:05 p.m. The meeting was opened with the
Pledge to the Flag.
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Litsey, Councilwoman
Ernst, Councilwoman Tjornhom, and Councilman Peterson
STAFF PRESENT: Todd Gerhardt, Elliott Knetsch, Laurie Hokkanen, Greg Sticha, Paul
Oehme, and Todd Hoffman
PUBLIC PRESENT FOR ALL ITEMS:
Morgan Ische 2383 Manuela Drive
JoAnne Lewellen 6340 Murray Hill Road
John Deluca 6484 Murray Hill Road
Ken Wencl 8412 Waters Edge Drive
PUBLIC ANNOUNCEMENTS:
Mayor Furlong: Thank you and welcome to everybody. Appreciate those of you that joined us
here in the council chambers, as well as those watching at home. At this time I would just like to
make a quick announcement. I think a number of people knew this with regard to our agenda
tonight. At the applicant's request, item number 2 will be tabled until our November 26th
meeting, so we'll not be addressing that this evening. If anybody's here for that, we apologize.
We just wanted to let you know that we will be picking that up at our next meeting again at the
applicant's request. With that, unless there are any other changes or modifications to the agenda,
we'll just proceed. First up tonight are consent agenda items.
CONSENT AGENDA: Councilman Litsey moved, Councilwoman Ernst seconded that the
City Council approve the following consent agenda items pursuant to the City Manager's
recommendations:
a. Approval of Minutes:
-City Council Work Session Minutes dated October 22, 2007
-City Council Verbatim and Summary Minutes dated October 22, 2007
Receive Commission Minutes:
-Planning Commission Verbatim and Summary Minutes dated October 16, 2007
-Park and Recreation Commission Verbatim and Summary Minutes dated October 23,
2007
c. Resolution #2007-66: Lake Riley Woods Channel Stabilization Project, SWMP 12-
035B: Award Contract.
125
City Council Meeting - November 13, 2007
d. Resolution #2007-67: Approval of Acquisition of Tax Forfeited Property on Powers
Boulevard.
e. Resolution #2007-68: SCBA Equipment (Breathing Apparatus) for the Fire Department:
Award of Bid.
f. Resolution #2007-69: Final Plat Approval, Life Time Fitness Second Addition.
g. Resolution #2007-70: Accept Street & Utility Improvements in Walnut Grove 2nd
Addition, Project 04-09.
h. Accept $1,000 Donation to the Fire Department from Spartan Chassis, Inc.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
VISITOR PRESENTATIONS:
Ken Wencl: Ken Wencl, Chanhassen from the watershed. Some of you know but some of you
may not know that we've had a so called common carp study going on in our three lakes, Riley,
Little Lake or Rice Lake Marsh and Lake Susan and they're coming up with some very
interesting things. But anyway on November 27th at 7:00 at the American Legion Hall right over
here the two doctors are going to be there. Mr. Sorenson, Dr. Sorenson and Dr. Pajanak and
they're going to give us a review as to what's going on in our community, in our area as far as
carp fish barriers and what we can do in order to control them to the best of our ability. There's
lots of things very interesting such as the carp will go through 200 pounds of cracked corn in
Lake Susan in one evening. Some of the carp in Lake Riley are 52 years old. Various things that
these gentlemen will explain. I don't want to take any of their thunder but please mark your
calendars and please come. We need the support to keep this going. It's being sponsored by the
Legislature. By the Legislature Citizen Committee. The watershed is going to help out and the
lake association members in and around our lakes are very high on this thing and working very
hard. You should be very proud.
Councilman Peterson: Are there cocktails?
Ken Wencl: Cocktails. That's good. There's a chip in there for each of you to have a
refreshment. Not really.
Councilman Litsey: This isn't a carp fry now is it?
Councilwoman Tjornhom: And what time was that?
Ken Wencl: At 7:00. On November 27th. It will be enlightening and we're going to try to make
it a fun evening so put everything aside and come. Thank you very much.
2
126
City Council Meeting - November 13, 2007
Mayor Furlong: Thank you. Thank you. Anyone else wish to address the council? If not I'd
like to introduce Jim Keeler, the new Carver County Attorney who's here this evening. Good
evening. Congratulations.
Jim Keeler: Thank you. Good evening Mr. Mayor. Members of the Chanhassen City Council.
My name is Jim Keeler. I am your newly appointed Carver County Attorney. As many of you
are aware, Mike Fahey, the long time Carver County Attorney was appointed to the District
Court Bench this past spring creating a vacancy in the office of Carver County Attorney and after
a search and interview process, had the good fortune of being appointed by the Carver County
Board of Commissioners to serve the remainder of Mr. Fahey's term through November, 2010.
And was sworn in on September 14th so I've been on the job for just around 2 months. Still like
it. Still showing up for the job. This truly is a homecoming for me. Chanhassen has been my
home for over 17 years. In fact when I first went to work for Carver County as an Assistant
County Attorney under Mike Fahey in 1990, I was newly married and my wife and I specifically
chose Chanhassen to make our home and we've continued to live in the same house all these
years. And even after I left the Carver County Attorney's office in 1996 to work for the
Hennepin County Attorney's office, we've continued to make Carver County and Chanhassen our
home. So to have the opportunity to continue my career of public service, particularly as a
prosecutor in my own back yard, I jumped at it and I'm thrilled to be back. I'm happy to
announce that one of my major goals, that is identifying and hiring a new Chief Deputy County
Attorney. I've done that. In fact Allison O'Toole started today as the new Chief Deputy. Allison
and I worked closely together in the Hennepin County Attorney's office. I think she's going to be
a great addition to the office. I have also, one of my second goals was to identify and hire a new
head of our office's civil division and I'm happy to report that Jennifer Tichy, currently with the
Bloomington City Attorney's office has accepted that position and will be starting at the end of
the month. So once Ms. Tichy is on board I'll have a full compliment of lawyers on staff and
throughout this time I've been trying to get up to speed with some of the issues that the County
board and the various departments are facing. So there's a fair amount of bed time reading that I
take home with me every night but I love the work. I'm thrilled to be back and I'm aware of the
fact that I've been appointed, not elected so I indicated to the board when I was interviewing for
the position that I would make every effort to go out and visit personally with each of the city
councils and the township boards and the school boards, and even though this is my home city,
Chanhassen is actually I think, I have Norwood-Young America next week and I'm pretty much
finished just in these 2 months making it to all of the city councils and most of the school boards.
And next round are the township boards, but I wanted to stop by and introduce myself
personally. Some of you, I know Chief Litsey and I worked together when I was an Assistant in
Hennepin County Attorney's office. Some of you I'm meeting for the first time so I wanted to
stop by and introduce myself. And to also let you know that at any time if you have any
questions or if there are concerns, issues facing the city of Chanhassen, by all means call me.
Let me know. I certainly will be more than happy to meet with you. Either individually or if
you wish, I'd be more than happy to return before the council at any time.
Mayor Furlong: Thank you. Any questions for Mr. Keeler?
Councilman Litsey: I'd just like to say, I've had a chance to see your work first hand and I think
we're very fortunate to have you as county attorney and I appreciate you applying for and
3
127
City Council Meeting - November 13, 2007
accepting the role. I think we're going to be well served by you in that position so, welcome
aboard.
Jim Keeler: Thank you. Thank you very much.
Mayor Furlong: Thank you.
Jim Keeler: Thank you Mr. Mayor.
Mayor Furlong: Anyone else for visitor presentations this evening? Okay, very good. There are
no other items to come before us this evening and we've got a short agenda with the one other
item being tabled, as I mentioned earlier so we'll move on to council presentations.
COUNCIL PRESENTATIONS:
Mayor Furlong: I guess I'd like to share, since we have until about 9:30. No, it will only go to
8:30. It won't take me that long. No. Last week I had the pleasure of joining some other mayors
for a mayor's summit in the City of Madison, Mississippi. Madison, Mississippi, along with the
City of Chanhassen and 8 other cities were all named by Family Circle Magazine as the best
towns in America to raise a family this last summer, and at the invitation of the Mayor of
Madison, Mississippi the other 9 of us traveled there last week and met and it was a very, very
worth while 3 day summit. We covered a variety of topics, from leadership and leadership
development, strategic planning, emergency preparedness, economic development was a big part
of our discussions, and we talked about best practices and what we do and how we do it. Each of
us had an opportunity to present a brief presentation about our city. I want to thank Laurie
Hokkanen for assisting me in putting together just a great presentation that really shared with all
of them just who we are and why this is such a great place to live. It was a good exchange of
ideas too. Very, very pleased with the time spent together. It was a chance for us to get to know
each other. What we found out is that there were a lot of common themes coming out of these
presentations about quality of life and great place to live and work and play. Cities that provide
great recreational resources and good public safety and I think those were some of the things that
people mentioned to me. Other mayors mentioned to me after our presentation about the, some
of the things that they thought it was very nice and really made our city stand out, our park and
trail system. The fact that we have a policy that says every home will be within a half mile of a
park. There was one of the city's there, a city in California is about double our size, has about 80
acres of parks. We have close to 400 acres of parks, plus our open space, which is about
equivalent so you know the fact that that as a policy has been stated for a number of years, that
we continue to follow, was something that they were impressed with. They were also impressed
with our planning, our financial planning. Some of the policies that we've done with finances
recently, as well as our public safety and what we're doing there with Carver County Sheriff's
Office, so it was a great exchange of ideas. It was very worth while. Brought back some new
ideas with Todd. We could sit down and start talking about some of those. But, and above all it
was something at the end that everybody, everybody agreed with the quality and the worth while
time that we had spent together and the desire to continue to work together so I expect that these
other cities, and they range from Franklin, Massachusetts to a city in Georgia. Cooper City,
Florida. Cities in Texas. Derby, Kansas. I mean across the country, and yet as much as we're
4
128
City Council Meeting - November 13, 2007
doing things here and sometimes we don't realize all the good things that we do do to sit down
with mayors from across the country and really hone in on the good things we do and to get ideas
on how we can do some things better so I wanted to share that with all of you. It was, like I said,
very worth while and just a very enjoyable 3 day experience. Southern hospitality was, went
overboard and they really laid out the red carpet for us, which was kind of neat so. Lot of fun.
Anything else from council presentations? If not, Mr. Gerhardt.
ADMINISTRATIVE PRESENTATIONS:
Todd Gerhardt: Well to keep that quality of life standard higher in Chanhassen, Paul has assured
me that our road projects this year will have final lift of blacktop or first lift of blacktop go down
by the end of this week so, weather permitting… That's your biggest concern when you get into
these road projects that you get that first lift down before you get substantial snow or frost starts
to build up so we've been fortunate here the last couple of weeks to let the contractors get their
work done and we did finish the Yosemite and Koehnen area so first lift is down there. In June
of 2008 you'll see the final lift go down and have that project finaled out. The Dogwood and
Tanadoona area is the concern right now and curb went down last week so blacktop should go
down this week and so the residents in that area will have a paved surfaced and Paul's crews will
have a paved surface to plow snow and not have to drive them in gravel or mud. Although the
Tanadoona people are probably used to that because that's the surface they had for many years,
but their quality of life definitely will increase once that surface goes down. So good job with
the contractor and Paul's crew and inspection crew did a great job this year on all those projects.
And that's all I had.
Mayor Furlong: Okay, thank you. Any questions for Mr. Gerhardt? No? Okay.
CORRESPONDENCE DISCUSSION. None.
Mayor Furlong: We do have some items to finish in our work session so we'll reconvene in our
Fountain Conference room. Is there anything else to come before us this evening?
Councilman Peterson: The only thing maybe, Elliott to put you on the spot and get some value
out of you this evening. Any thoughts, I know that we have the new Carver County Attorney
here. We've had some challenges with the system before and that's one question. The second,
how's it been going the past year?
Elliott Knetsch: I would say things have gone well. We're very pleased to provide that service
for you. Carver County has a new court administrator named Vicky Carlson. I've been working
with her regarding any, the court is reviewing all it's scheduling mostly due to the fact that they
have a new judgeship was created and the Governor, I believe the appointment hasn't been made
yet. It's due any time so there's going to be a new judgeship for Carver County and the chambers
for that judge will be Chaska. So they're going to have another judge to help deal with their
calendar so, because of that they're reviewing all their current calendars. I've known Vicky
Carlson since, I think she was about 19. She was straight out of high school when she started as
a court clerk in Dakota County and that's about 1985. So I have a good working relationship
with her and we were discussing the Chanhassen calendar, whether there's a need for a separate
5
129
City Council Meeting - November 13, 2007
6
calendar. Those sorts of issues. But basically you've had the same calendar now for I think
maybe 18 months to 2 years. The system is working pretty well. Sufficient for the number of
cases you have. I saw in our correspondence packet we had a quarterly report was in there. So.
Councilman Peterson: It's going well.
Elliott Knetsch: I think things are going fine, yes.
Councilman Peterson: Good. Glad to hear it.
Mayor Furlong: Good. Anything else?
Councilman Peterson moved, Councilwoman Ernst seconded to adjourn the meeting. All
voted in favor and the motion carried. The meeting was adjourned at 7:20 p.m.
Submitted by Todd Gerhardt
City Manager
Prepared by Nann Opheim
130
5
CHANHASSEN PLANNING COMMISSION
REGULAR MEETING
SUMMARY MINUTES
NOVEMBER 6, 2007
Chairman McDonald called the meeting to order at 7:00 p.m.
MEMBERS PRESENT: Jerry McDonald, Kurt Papke, Kevin Dillon, Kathleen Thomas, Debbie
Larson, Mark Undestad and Dan Keefe
STAFF PRESENT: Kate Aanenson, Community Development Director; and Sharmeen Al-Jaff, Senior
Planner
PUBLIC PRESENT FOR ALL ITEMS:
Debbie Lloyd 7302 Laredo Drive
Janet Paulsen 7305 Laredo Drive
PUBLIC HEARING:
LAKESIDE: REQUEST FOR MINOR PUD AMENDMENT TO ADJUST INTERNAL
SETBACK REQUIREMENTS FROM 20 FEET TO 15 FEET AND ADJUST THE WETLAND
SETBACK CONSISTENT WITH CURRENT WETLAND SETBACK REQUIREMENTS.
APPLICANT: SIENNA CORPORATION, PLANNING CASE 07-23.
Public Present:
Name Address
John Vogelbacher 4940 Viking Drive, #608, Edina
Kate Aanenson presented the staff report on this item. John Vogelbacher, Project Manager with Sienna
Corporation addressed a glitch in their planning that brought this application back to the city asking for a
PUD amendment. Chairman McDonald opened the public hearing. Deb Lloyd, 7302 Laredo Drive
asked for the commission's consideration in looking at the additional variances being requested for the
wetland buffer and wetland buffer setback, the decrease in the wetland buffer setback from what was
previously approved in the final plat, and the spacing between buildings. Commissioner Keefe asked for
clarification on the difference between an amendment to the PUD and a variance. Mary Borenson,
being a member of the advisory committee for the Riley-Purgatory-Bluff Creek Watershed District
stated she was present to support and agree with some of the things that were presented by Deborah
Lloyd regarding the impervious surfaces and modified setbacks and showed maps outlining the water
quality of area lakes. Chairman McDonald asked that any comments made from the public pertain to the
PUD amendment only. He then closed the public hearing. After comments from commissioners, the
following motion was made.
131
Planning Commission Summary - November 6, 2007
Papke moved, Larson seconded that the Chanhassen Planning Commission recommends that the
City Council approve the amendment to the Planned Unit Development (PUD 06-26) development
design standards, section c. Setbacks, to read as follows:
c. Setbacks
The PUD ordinance requires setbacks from roadways and exterior property lines. The following table
displays those setbacks.
Setback Standards
Highway 212 50 feet
East(Perimeter) Lot Line 50 feet -townhouses/twin
homes;
Building Height –
Condominiums with a
minimum of 30 feet
Lyman Boulevard 50 feet/30 feet for beach lot
West(Perimeter) Lot Line 50 feet
Twin Home separation between buildings 15 feet
Townhouse separation between buildings 15 feet
Minimum Driveway length (to back of curb, trail or sidewalk) 25 feet
Hard Surface Coverage 50 % *
Wetland: Buffer and buffer setback 20 feet and 30 feet
Lake Riley 75 feet
# Decks, patios, porches, and stoops may project up to seven (7) feet in to the required yard.
* The entire development, including the public and private streets and Outlots, may not exceed 50
percent hard coverage. Individual lots will exceed the 50 percent site coverage.
All voted in favor, except Keefe who opposed, and the motion carried with a vote of 6 to 1.
PUBLIC HEARING:
T-MOBILE: REQUEST FOR CONDITIONAL USE PERMIT AND SITE PLAN REVIEW
AMENDMENTS TO ALLOW A 145 FOOT TELECOMMUNICATION TOWER WITH A 4-
FOOT LIGHTNING ROD AND A 6 FOOT PRIVACY FENCE, LOCATED WEST OF GREAT
PLAINS BOULEVARD, NORTH OF CREEKWOOD DRIVE, SOUTH OF HALLA NURSERY,
AND EAST OF BLUFF CREEK GOLF COURSE (OUTLOT A, HALLA MARYANNE
ADDITION). APPLICANT: T-MOBILE USA, PLANNING CASE 07-04.
Public Present:
Name Address
Steve Edwards 501 50th Street West
John Landwehr 22016 East Bethel Boulevard
Wendy Biorn 555 West 1st Street, Waconia
2
132
Planning Commission Summary - November 6, 2007
Jim Sabinske 775 Creekwood
Gary Anderson 725 Creekwood
Walter G. & Chrisann Arndt 10151 Great Plains
Sharmeen Al-Jaff presented the staff report on this item. Mark Undestad asked for clarification of
where the approval from the Historical Society fits into the process. Commissioner Keefe asked about
different design options to camouflage antenna towers. Commissioner Papke asked about notification of
neighbors being impacted by the new location. Commissioner Dillon asked for clarification on the
historical society's role in the approval process. Steve Edwards with T-Mobile noted that Cingular
Wireless, which is now AT&T, still plans to locate on the tower which meet the intent of the ordinance
to reduce the number of towers by co-locating other cellular carriers onto this tower and addressed the
issue of appearance. John Landwehr with Pinnacle Engineering addressed the compliance with 106
standards and the process that was taken in finding a new location for the tower on the site. Chairman
McDonald opened the public hearing. Wendy Biorn, Executive Director with the Carver County
Historical Society was speaking on behalf of the Carver County Historical Society as well as the
Preservation Alliance in Minnesota and the Minnesota State Historic Preservation Office at the
Minnesota Historical Society. She explained how the 106 process works and how those rights affect the
August Vogel house. Gary Anderson, 725 Creekwood stated if this tower is moved where proposed, he
would be looking at it out the picture window of his home. And in review of the city's 2030
comprehensive plan, specifically the chapter on historic preservation, he noted this area is guided for
residential low density of 4 houses per acre. He asked that the commission consider residents such as
himself who have lived and paid taxes in the city of Chanhassen for 30 plus years. Chrisann Arndt, who
lives in the historic August Vogel property, thanked everybody for their work in moving the cell tower
and outlined all the work she and her husband have done to restore the property back to it's original
state. Jim Sabinske, 775 Creekwood agreed with Mr. Anderson's comments and stated he was speaking
pretty much on behalf of the whole Creekwood neighborhood about their concern that T-Mobile had
found a second site to locate the tower. Chairman McDonald closed the public hearing. After
comments and discussion from the commission, the following motion was made.
Undestad moved, Dillon seconded that the Planning Commission recommends approval of the
Amendment to the Site Plan Review #07-04 for a 149-foot telecommunication tower and a 7-foot
chain link fence with 3 rows of barbed wire as shown on the site plan received January 19, 2007,
subject to the following conditions:
1. The applicant shall enter into a site plan agreement and submit financial security to guarantee the
improvements.
2. Clearing for the tower and equipment pad shall be no greater than 15 feet from the edge of the pad.
3. A maximum of 25 feet is allowed for clearing the access road to the site. Trees shall be preserved to
the greatest extent possible.
4. The applicant shall install a minimum of eight Black Hills spruce around the equipment platform.
Trees shall be at least six feet in height.
3
133
Planning Commission Summary - November 6, 2007
5. Site grading and vegetation removal shall be minimized to the greatest extent practical. If any
excess material is anticipated to be generated as a result of access road construction, the disposal
location must be approved in writing by City staff prior to road construction.
6. A rock construction entrance complying with the City’s standard detail (#5301) shall be included on
the Erosion and Grading Plan and shall be constructed prior to the remainder of the gravel road.
7. If applicable, the applicant shall apply for and obtain permits from the appropriate regulatory agencies
(e.g., Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency) and
comply with their conditions of approval. (Watershed district and MPCA permits are necessary if the
total disturbed area is in excess of 1.0 acres).
8. The monopole/tower shall be moved 25 feet to the west for a total setback of 175 feet and maintain a
minimum of 150-foot setback from the north, west and south property lines.
9. The driveway off of Creekwood Drive may not be used to serve nor access the Halla Nursery
commercial operation.
10. Building Official Conditions:
a. A building permit is required to construct the tower and equipment platform; the tower must be
designed for a wind load of 90 MPH for 3 seconds (ref. 2000 IBC, Sec. 1609) and include the
effect of one-half inch of radial ice (ref. MSBC 1303.1800).
b. The plans (tower and platform) must be signed by a professional engineer licensed in the State of
Minnesota.”
c. The contractor shall meet with the Inspections Division as early as possible to discuss plan
review and permit procedures.
All voted in favor, except Keefe who opposed, and the motion carried with a vote of 6 to 1.
Undestad moved, Dillon seconded that the Planning Commission recommends approval of the
Amendment to the Conditional Use Permit #07-04 for a 149-foot telecommunication tower and a
7-foot chain link with 3 rows of barbed wire as shown on the site plan received January 19, 2007,
subject to the following conditions:
1. The applicant shall enter into a conditional use permit agreement and submit financial security to
guarantee the improvements.
2. The tower shall comply with the requirements in ARTICLE XXX. TOWERS AND ANTENNAS of
the Zoning Ordinance.
3. The tower shall not be illuminated by artificial means and shall not display strobe lights unless such
lighting is specifically required by the Federal Aviation Administration or other federal or state
authority for a particular tower.
4
134
Planning Commission Summary - November 6, 2007
5
4. No signage, advertising or identification of any kind intended to be visible from the ground or other
structures is permitted, except applicable warning and equipment information signage required by
the manufacturer or by Federal, State, or local authorities.
5. The applicant shall submit documentation at the time of building permit application showing the
height above grade for all potential mounting positions for co-located antennas and the minimum
separation distances between antennas. A description of the tower’s capacity, including the number
and type of antennas that can be accommodated should also be provided.
6. The monopole color shall be the brand “Tnemac” and the color “Blue Elusion”.
7. All outdoor storage associated with the Halla Nursery and located within Outlot A, Halla Maryanne
Addition, shall be removed prior to issuance of a building permit for the tower and the area shall be
revegetated.”
All voted in favor, except Keefe who opposed, and the motion carried with a vote of 6 to 1.
PUBLIC HEARING:
COMPREHENSIVE PLAN: CHAPTER 3, HISTORIC PRESERVATION AND CHAPTER 4,
HOUSING ELEMENTS.
Sharmeen Al-Jaff presented the staff report on Chapter 3, Historic Preservation. Chairman McDonald
asked for clarification of the city's role once a property has been identified as historically significant.
Commissioner Papke reiterated that all Chapter 3 does is say the city will make a list of historic sites
over the next 10 years. Wendy Biorn with the Carver County Historical Society explained how the
Chanhassen Historical Society is being formed to basically address the issue of preserving the old St.
Hubert's Church. Chairman McDonald suggested the City use the ordinance and inspections process to
help with historic preservation. Kate Aanenson presented the staff report on Chapter 4, Housing
Elements and provided background information on the Livable Communities Act. Commissioner Keefe
asked for clarification on the benefits of following the Livable Communities Act. Commissioner Papke
suggested touring historic sites in the city at the Planning Commission's next work session.
No action was taken on this item. The public hearing was continued open.
APPROVAL OF MINUTES: Commissioner Dillon noted the verbatim and summary minutes of the
Planning Commission meeting dated October 16, 2007 as presented.
COMMISSION PRESENTATIONS: None.
Chairman McDonald adjourned the meeting at 9:25 p.m.
Submitted by Kate Aanenson
Community Development Director
Prepared by Nann Opheim
135
CHANHASSEN PLANNING COMMISSION
REGULAR MEETING
NOVEMBER 6, 2007
Chairman McDonald called the meeting to order at 7:00 p.m.
MEMBERS PRESENT: Jerry McDonald, Kurt Papke, Kevin Dillon, Kathleen Thomas,
Debbie Larson, Mark Undestad and Dan Keefe
STAFF PRESENT: Kate Aanenson, Community Development Director; and Sharmeen Al-
Jaff, Senior Planner
PUBLIC PRESENT FOR ALL ITEMS:
Debbie Lloyd 7302 Laredo Drive
Janet Paulsen 7305 Laredo Drive
PUBLIC HEARING:
LAKESIDE: REQUEST FOR MINOR PUD AMENDMENT TO ADJUST INTERNAL
SETBACK REQUIREMENTS FROM 20 FEET TO 15 FEET AND ADJUST THE
WETLAND SETBACK CONSISTENT WITH CURRENT WETLAND SETBACK
REQUIREMENTS. APPLICANT: SIENNA CORPORATION, PLANNING CASE 07-23.
Public Present:
Name Address
John Vogelbacher 4940 Viking Drive, #608, Edina
Kate Aanenson presented the staff report on this item.
McDonald: Kevin, you want to start?
Dillon: So just so I'm clear then, from the edge of the building to the edge of the wetland now
is?
Aanenson: 50.
Dillon: 50.
Aanenson: Correct. And that's consistent with the new classification that we go to Manage 1,
Manage 2. We used to have the Ag Preserve and Natural so this is consistent with the new
wetland regulations.
Dillon: Okay. And so then the 15 feet that's changing inbetween the building, I mean the city
doesn't really care about that?
136
Planning Commission Meeting - November 6, 2007
Aanenson: No. We see that as a minor issue. They are 20 foot on the, the twin homes on the
north side, those are all 15 feet inbetween. So they'll be more with 20. We could have shifted
them all forward and maybe picked it up on this end but that building was already put in place
because they did as part of the first phase so it wasn't you know, otherwise we could have
probably kept that inbetween. But we certainly didn't want to give a variance to the wetland
setback. We had talked about that originally and that was one…didn't want to do that so since it
was an internal amendment for the PUD, not a variance, we thought that was the best way to go.
Dillon: Okay.
McDonald: Kurt?
Papke: I don't have anything.
McDonald: I don't have any questions either. Is the applicant here? Or representative. Do you
want to come up and address the commissioners? Is there anything you would like to add?
John Vogelbacher: My name is John Vogelbacher. I'm the Project Manager. I'm with Sienna
Corporation. I don't have really anything to add other than you know we had kind of a glitch in
our planning and that's unfortunate but I think in terms of result here we're not significantly
asking for any variances. It fits the project that we have in terms of building setbacks between
buildings and certainly meets the current ordinance for the wetland setback as well so we're
fortunate in that regard. Engineering staff and land planning so appreciate the opportunity to be
in the community. We're very happy with our project. As all things go we'd like things to be a
little bit better but it's been good so far so we're pleased with that.
McDonald: Okay. Does anyone, commissioners have any questions? Thank you very much.
Then at this point I would open up the podium for anyone wishing to make comment. To come
forward and as I said, please address the commissioners. State your name and address.
Deb Lloyd: Good evening. Deb Lloyd, 7302 Laredo Drive. I spoke up about this development
before and there are some items here I'd like to add for your consideration this evening. This
development, as you are aware, the final plat went to the city on October 23, 2006. I don't know
if any of you have taken the time to read what went to the city then for approval, but I'm going to
read a little excerpt on it today. This development is gorgeous. You know there's no doubt
about that. It's going to be a beautiful addition to our city, but we did grant variances already for
this development. For the height of the structure and also there are people that live outside of
what we call the normal boundaries to use the beachlot. We granted that to them as well. I don't
quite understand what an amendment is. I look at it as another variance to allow something that
wasn't originally approved. To get approved for this. Condition number 4 on the final plat, a
minimum buffer of 16.5 to 20 feet shall be preserved around the perimeter of the wetland. All
structure, including parking lot, shall maintain a 40 foot setback from the wetland buffer. The
plans shall be revised to reflect the required wetland buffer and wetland buffer setback. It was a
condition…
2
137
Planning Commission Meeting - November 6, 2007
McDonald: Excuse me Deb, could I interrupt you for a second because I'm not sure what the
relevance is and Kate, could you, I mean I understand the final plat went forward but if all this is
we're looking at adopting what is currently the setback requirements, how is the final plat that
went before the City Council relevant to any of this?
Aanenson: I believe the point that is trying to be made is that, because it was given relief before,
that maybe some additional relief shouldn't be given in the future, but.
Deb Lloyd: The point is the point I'm trying to make is that it was stated in here that it was a
condition that they have, that they apply that setback. And they didn't do it. It was a condition
of approval. In the staff report for this evening on page 2, towards the second to last paragraph
reads, the developer did not review the implications of the townhouse separation requirement
relative to the wetland setback. I mean this is a national builder. I think you have to have some
responsibility here as a builder. I mean I, Sienna Corporation's been around since 1977. They're
in Minneapolis, Palm Springs, Lake Havasu. They have developments everywhere. Oversight,
whatever. Where's the responsibility? So now it says we have to create essentially another
variance to allow this to occur. In my opinion you go over the variance findings. Another
interesting fact. The wetland buffer before was 16.5. Now it's 20. The buffer setback was 40
before. This is on your report. Now it's 30. So the setback was 56.5 in total before. Now it's
less. It's 50. So it's not only the fact that they're meeting the new standards. The new standard is
less. Additionally they're asking for a reduction in setbacks. The week that this was on the
agenda before at planning there was another gentleman that was described as a, really Jerry
described him as a really friendly kind of guy and he had built up, he had built a structure on the
side of his garage to house a motorcycle. And some different points were brought up there. Dan
brought up, do we end up with a potential issue with the fire being able to get to emergency
vehicles if you change the setback there? Setbacks are there for a reason Jerry said. Mr. Thomas
said, I can totally understand setbacks. If we grant them like this it creates a slippery slope. I'm
sorry, Kathleen. Sorry. But setbacks are there for a reason. We have setbacks to ensure there's
open space and adequate light and air. Setbacks promote fire safety by spacing buildings. And
the other impact of this parcel is shoreland. So you're putting the buildings tighter together.
Once they let, that has never been actually done even on a final plat with the actual impervious
surface of this development. There's emails between the Paulsen's and City Council and Kate
and Todd that the impervious surface went from like 41.5, growing, growing, growing. Yeah it
may be under the 50% but do we really know what it is? And you're moving these buildings
together and tighter together. Do we know the effect of the runoff? I mean I just think that this
decision rests with the City Council. This is a political decision, in my opinion. If you go to
what your variance findings should be, you have to assure that, that you're really needing them.
The condition. The purpose is not based upon a desire to increase the value or the income
potential of the property. The alleged difficulty or hardship is not a self created hardship. It is
self created. Someone didn't do their job or someone thought oh we'll get this through. I mean
we already lowered the standards of the wetland setbacks. We already gave them that amount of
footage and now if you guys rubber stamp this, anyway thank you for listening.
McDonald: Okay, thank you.
Aanenson: Can I respond or comment or?
3
138
Planning Commission Meeting - November 6, 2007
McDonald: Yeah, if you wouldn't mind.
Aanenson: Sure. A variance, a PUD is, there is no internal setback. That's something that we
established. So it is a different criteria for a variance as opposed to a side yard setback on a
residential district that has a standard that's not part of the PUD. That's standard. If you wanted
to say that they had to stay within that extra 5 1/2 feet, could you make all of the buildings
inbetween 15 feet? You can make that. I mean it's 15 across the street on the other side. That
continue the setback. And really the council was actually looking at going less on the, when they
were discussing the setback buffer, the staff felt strongly about keeping the buffer requirements
so we're talking about the 5 1/2 foot differential on that. And to go back and look at the original
variances, you have to put it in context of when we were discussing the merits of this project as
opposed to that it was already zoned residential high density. There was a lot of things that
could have gone in there. It was the desire, because it already had the entitlement on it, which
meant that they could come forward and advance the project. The city's goal was to get highly,
higher architecture and to do a PUD. They did not want to do a PUD. We suggested the PUD in
order to get the higher architecture. Instead of just a standard project which didn't need that
requirement, so we suggested the PUD. We also wanted to mix the product type in there. Not to
have all of one type, so in order to do the condominium projects that we don't have anything in
that market price point right now, there was a variance given to the height of those buildings.
That was the only variance. As a matter of fact if it would have gone in under the existing
standards, those buildings would be closer to all property lines because that underlying ordinance
allowed much closer setbacks. This PUD requires greater buffers around the perimeter of the
property line, so there's benefits we believe in doing the PUD and that's what was discussed at
the time that the PUD so those variances were given for the height. I'm not sure about the dock.
That dock is for the association members themselves. I'm not aware of anybody that this opened
up to except for association members. So with that we still feel that the best way to handle this is
an amendment which has a different criteria than the variance.
McDonald: Okay, because as I understand you're not asking us to vote on a variance. You made
that very clear up front so you're presenting an amendment to the PUD.
Aanenson: Correct.
Keefe: What is the difference between an amendment to the PUD and a variance?
Aanenson: Sure. The PUD is the design standards you put in place. And at that time they were
negotiated. There is no requirement between the buildings there so we at that time it was felt 20
foot seemed like appropriate. That's what they wanted and as it moved forward we put on the
condition, the wetland buffer setback had been put in place, and then with the retaining walls and
the like, recognized that it probably wouldn't work after we had the first building. Had that not
been done, they would have all slipped forward as I mentioned.
Keefe: There's a variance for setback between buildings because it's a PUD right?
Aanenson: Right.
4
139
Planning Commission Meeting - November 6, 2007
Keefe: Okay. So that's allowed to have that smaller distance than we would require in another
zoning?
Aanenson: Correct.
Keefe: Okay. But it does say there's a variance for the wetland setback which was denied, but
then this is coming back really as an amendment to the setback…
Aanenson: Right, right. Right, so again what I'm saying is if you felt uncomfortable doing that,
right. Then you could make all the buildings, the 5 foot inbetween. Then you could make that.
So right now we're just suggesting the 2.
Keefe: In terms of the hard surface coverage, I mean this change wouldn't result in any
incremental would it necessarily?
Aanenson: I don't believe so. I can check. I'll verify that.
Keefe: …they're not adding anything right?
Aanenson: No.
Keefe: They're just closer together.
Aanenson: Correct. But I could verify that for City Council. The percentage.
Dillon: So is the 50 foot setback from the edge of the wetland, is that applied to all projects of
this genre?
Aanenson: All of them, it depends upon the classification of the wetland. This one is classified
as a Manage 2 which has a 20 foot buffer requirement and a 30 foot setback from that.
Dillon: So there's nothing special being given or.
Aanenson: No. I guess the argument that was being made is when it came in it was under a
different, it had a different zoning. We've changed the setback requirement from the wetland.
That's the point of contention.
Keefe: And that's where the variance really comes into play because the variance was related to
that setback requirement, right?
Aanenson: Except you can make the same argument between the buildings. Correct.
McDonald: Does anyone else have any questions or need clarification?
5
140
Planning Commission Meeting - November 6, 2007
Larson: Just one thing. Kate, just towards the…could they put the buildings 1 foot apart if they
wanted to within this district?
Aanenson: You'd have to give the amendment, correct. Correct.
Larson: But they could.
Aanenson: They could. Right.
Larson: Gotch ya.
McDonald: Does anyone else wish to come up and make comment.
Mary Borenson: I'm Mary Borenson. I'm here to support and agree with some of the things that
were presented by Deborah Lloyd regarding the impervious surfaces and modified setbacks.
And I have this copy from the DNR web site, which is not a very good copy but it shows that, it
shows the 12 lakes in the Riley-Purgatory-Bluff Creek watershed district. I live on Frontier Trail
but I'm a member of the advisory committee for the Watershed District and it shows color coded
that the light, that the yellow lakes are 1.5 to 3 feet of clarity and they're all on the impaired list
so that includes Lake Riley, Mitchell, Lotus Lake, Red Rock, and Lucy. And it shows only 2
lakes in the watershed district are worst and those would be Rice Lake Marsh, which really is a
marsh, and Lake Susan. It shows a couple of lakes that are better in clarity but the 1.5 to 3 feet
of clarity puts it on the Minnesota 303 impaired list so the City is trying to make, is mandated to
make efforts to improve the water quality on that lake and do projects towards making it better.
And at this time Lake Riley is considered a recreational lake to support swimming and fishing
and according to these statistics it's marginally supporting swimming and it's possibly impaired.
And given this data any increase in phosphorous contribution could degrade or impair support
for swimming and any increase in phosphorous could further impede phosphorous reductions
needed to address downstream impairments in Riley Creek. So Riley Lake flows into Riley
Creek which is also on the same list. Storm water runoff is one of the most significant sources of
water pollution in the nation. At times it's comparable to if not greater than contamination from
industrial and sewage sources.
Dillon: Time out. What are we, are we getting off track here a little bit?
Mary Borenson: And maybe we are. My concern is for the lake itself and effects of the
impervious surface and changing the setbacks and…
Dillon: We just heard that the impervious surface isn't going to change. Or we'll verify that.
Mary Borenson: So the phosphorous and the runoff would, with the buildings being closer to the
lake will lead to more runoff.
Aanenson: They're not moving closer to the lake. We're moving 2 buildings closer to each
other. And actually this project puts storm water in there that wasn't being treated before.
Previously it was running right into the lake. This is the…that was approved. The…are over
6
141
Planning Commission Meeting - November 6, 2007
here. This is the condominium building that hasn't been built yet. So these are the two projects
that are moving closer to each other. 5 feet closer to each other. So if you look at these, it'd be
these buildings right here moving closer to each other. So nothing's moving closer to the lake.
Papke: And those drain to the drainage pond?
Aanenson: They're all being pre-treated which wasn't happening under the previous project,
which again is one of the benefits when we looked at advancing this project, that it would clean
up an area that wasn't being treated before…
McDonald: Okay, before you go on. I'm getting very confused about all of this and I guess the
problem is, this seems to be, it was a pretty straight forward, simple thing coming in. This
development had a lot of controversy when it came up. This is being used as an opportunity to
re-open basically old wounds, then I'm not going to allow anyone else to come up forward and
speak about this. If you can't get to why this amendment should not be passed, then the rest of it
is beyond our capability. This development has already been approved. It is already being built.
The project is going forward. We have discussed the issue about water quality. The whole thing
about wetlands. There was a big discussion about that. That is in place. The developer has to
meet those standards. I don't see anything in here that's saying we're going to be changing those
standards. I don't see where that's up for issue at this so unless we can get back to issues that
deal with this amendment, I'm not sure what everybody's talking about and I think the
commissioners would share that feeling that we're talking about things that are beyond the scope
of anything that we can do with this amendment. So if there's not a point to this that leads back
to this, I would ask that you sit down.
Mary Borenson: Thank you for your time.
McDonald: Okay, thank you. Does anyone else wish to come forward and to address the issue
of this amendment and of basically just moving these buildings closer together so that it meets
the overall goals of what the city wants? Okay, at that point the public meeting is closed and I
would bring it back up for the commissioners for discussion and we would start with Mark.
Undestad: No. It's pretty straight forward to me. I mean we're not changing anything. Just by
the PUD, by creating the PUD that's where we correct, create all the issues we want to take care
of with the developer. That's why we created the PUD so, all that's been handled here. I don't
see an issue with this.
Larson: I agree. You know they're just shuffling things around within the PUD. It doesn't affect
anything else that's been approved. I don't see any problem with it.
McDonald: Kathy.
Thomas: Ditto.
Keefe: I'm a little bit troubled just in regards to the, now whether it's you know an amendment to
the PUD or whether we need to look at it in terms of it's an amendment to a variance. …sort of
7
142
Planning Commission Meeting - November 6, 2007
crystal clear on that. It isn't really clear in my mind. I guess regards to the issues, setbacks
between buildings, I think we need to think about all, you know and it probably isn't in context
with this, but to think about you know for arguing you know about setbacks between residential
houses and we're allowing this, to get this narrow between buildings. I think we may have a
potential consistency issue there. The runoff, I don't see any issue with the runoff because I don't
believe that it's, we're not adding additional hardscape. I don't believe. I think it's a net zero in
regards to the hardscape issue. I guess I'm kind of on the fence. I haven't resolved it in my mind
in regards to whether this amendment, I mean it doesn't, it seems like a pretty innocuous
amendment but that's my comment.
McDonald: Kevin.
Dillon: I think that the internal setbacks of 15 feet, I mean that is the issue for the developer.
You know it might have the effect of making the property a little bit less marketable just because
it's not as spacious but that's you know their issue. I hear what Dan's saying but I mean it's,
nothing is different than between two adjacent properties that are owned by different people.
Different families or whatever and so I am as well, you know keeping the 50 feet from the edge
of the wetland, I think that's fine. I want to thank the commissioner for bringing us back on task
here for this one too.
McDonald: Okay. I would just re-emphasize everything that you had said at this point. You
know I think I've already said I'm not seeing what the issue really is. The PUD has been settled.
At that point they have agreed to certain standards. What they do internal, I don't see where it's
covered by anything that we've got so I guess I just don't see this as being a big issue. If anyone
wishes to make a recommendation.
Papke: Mr. Chair, I make a motion that the Chanhassen Planning Commission recommends the
City Council approve the amendment to the Planned Unit Development, PUD 06-26,
development design standards section c. Setbacks to read as stated in the staff report.
McDonald: Second?
Larson: Second.
Papke moved, Larson seconded that the Chanhassen Planning Commission recommends
that the City Council approve the amendment to the Planned Unit Development (PUD 06-
26) development design standards, section c. Setbacks, to read as follows:
c. Setbacks
The PUD ordinance requires setbacks from roadways and exterior property lines. The following
table displays those setbacks.
Setback Standards
Highway 212 50 feet
East(Perimeter) Lot Line 50 feet -townhouses/twin
8
143
Planning Commission Meeting - November 6, 2007
Setback Standards
homes;
Building Height –
Condominiums with a
minimum of 30 feet
Lyman Boulevard 50 feet/30 feet for beach lot
West(Perimeter) Lot Line 50 feet
Twin Home separation between buildings 15 feet
Townhouse separation between buildings 15 feet
Minimum Driveway length (to back of curb, trail or sidewalk) 25 feet
Hard Surface Coverage 50 % *
Wetland: Buffer and buffer setback 20 feet and 30 feet
Lake Riley 75 feet
# Decks, patios, porches, and stoops may project up to seven (7) feet in to the required yard.
* The entire development, including the public and private streets and Outlots, may not exceed
50 percent hard coverage. Individual lots will exceed the 50 percent site coverage.
All voted in favor, except Keefe who opposed, and the motion carried with a vote of 6 to 1.
PUBLIC HEARING:
T-MOBILE: REQUEST FOR CONDITIONAL USE PERMIT AND SITE PLAN
REVIEW AMENDMENTS TO ALLOW A 145 FOOT TELECOMMUNICATION
TOWER WITH A 4-FOOT LIGHTNING ROD AND A 6 FOOT PRIVACY FENCE,
LOCATED WEST OF GREAT PLAINS BOULEVARD, NORTH OF CREEKWOOD
DRIVE, SOUTH OF HALLA NURSERY, AND EAST OF BLUFF CREEK GOLF
COURSE (OUTLOT A, HALLA MARYANNE ADDITION). APPLICANT: T-MOBILE
USA, PLANNING CASE 07-04.
Public Present:
Name Address
Steve Edwards 501 50th Street West
John Landwehr 22016 East Bethel Boulevard
Wendy Biorn 555 West 1st Street, Waconia
Jim Sabinske 775 Creekwood
Gary Anderson 725 Creekwood
Walter G. & Chrisann Arndt 10151 Great Plains
Sharmeen Al-Jaff presented the staff report on this item.
McDonald: Mark.
Undestad: Yeah, just to help me out here but this all was approved and council went through the
whole thing.
9
144
Planning Commission Meeting - November 6, 2007
Al-Jaff: Correct.
Undestad: Had it okayed. And then after that approval then T-Mobile had to go back and get the
historical.
Al-Jaff: Correct. That's, it's one of the steps that they have to go through and that is consult the
historic preservation. This time around the city contacted the historical preservation and we
actually sent them a copy of the plan and requested that they give a recommendation in writing
whether this location is acceptable or not.
Undestad: T-Mobile wasn't aware of that requirement when they came through the first time?
Al-Jaff: I think they were.
Aanenson: Yes they were.
Al-Jaff: Aware of it. They just did not…
McDonald: We'll get to you guys.
Steve Edwards: I can give you some background on that…
McDonald: Well yeah. Why don't you wait because you're going to get a chance to come up
next.
Undestad: That's all I have for Sharmeen.
Al-Jaff: Thank you.
Larson: No, not now.
McDonald: Dan.
Keefe: Just a couple questions. Quick ones. You make mention on the setback for Highway
101, the realignment. In it's new location it's not even going to be an issue.
Al-Jaff: No and we actually received a letter from MnDot this morning saying that there is
ample room between the new proposed location and where they intend to realign 101.
Keefe: Right. And the, you know it seems like the real issue, potentially negative issue is the
visual intrusion I think is part of the reason why it got moved for the you know historical reason.
They don't want to have big kind of gaudy. Just a couple points on that. You know are there any
of the designs that these phone companies are coming up with for these towers, you know to
make it look more appealing than this hunk of metal hanging up in the air? I mean, and maybe
that's more of a question to ask you guys.
10
145
Planning Commission Meeting - November 6, 2007
Al-Jaff: You know color is one way to address that.
Keefe: Well that was the other thing is we've talked about a paint color before. Is that
something…
Al-Jaff: Yes, and it's still part of the approval.
Keefe: Yeah, okay. I'll direct that question.
Papke: So what's the down side? Why didn't we pick this spot in the first place?
Al-Jaff: We addressed the location that was submitted by the applicant.
Papke: So in, if it's always the zero sum game in this kind of thing so in this case it sounds like
the down side is now the people on the golf course more than the cell phone tower? That's kind
of the bottom line?
Aanenson: Correct.
Papke: And in terms of if at some point the golf course is developed into homes, those won't be
historical and so the people that buy them will buy them knowing that they have a view of the
cell tower in their back yard.
Al-Jaff: And if the applicant…how long of a lease do you have? And it's a 30 year lease.
Papke: So were there any conversations with the owners of Bluff Creek Golf Course about this?
Al-Jaff: They were notified.
Papke: They were notified?
Al-Jaff: Correct. Everyone within 500 feet were notified.
Papke: And they had no comments?
Al-Jaff: We haven't heard from them.
Aanenson: Well that's not, we did have some people come in last week that were concerned that
they'd now have the brunt of the impact. They understand that we're still supporting it. We have
to recommend approval of it but it's, how do you say that. There's an up side and a down side.
Papke: Yeah.
Dillon: So is going to the historical society last a normal order of events?
11
146
Planning Commission Meeting - November 6, 2007
Al-Jaff: Typically. This time around we contacted the historic society and made them aware
that this is coming back.
Aanenson: Can I clarify that a little bit more? Typically, if this didn't require a federal permit,
any visual impacts probably wouldn't, may or may not have been noted by the historical, but
because it requires a federal permit, which we hadn't recognized but that does trip the review by
the historic preservation office. So there might have been another type of building there that
may or may not trip that visual impact. But the federal permit definitely connects the 106
historic regulation so we missed that step. Well they knew they needed to do it, we missed that
step and it's now so noted. A federal permit does require that.
Dillon: So is the historical society the final authority in these matters?
Aanenson: In this one? Correct. We don't have an ordinance on that. The state historical.
Dillon: It doesn't sound very official. So then, so the first, so does the owner of the property
have an issue? Or is it just the historical society? Was the owner of the property at the first
hearing?
Al-Jaff: The owner of the property, the historic property or the owner of.
Dillon: The historical property.
Al-Jaff: They have an issue and they contacted the city and as such.
Dillon: Because I remember this one but I don't have…
Al-Jaff: They did not attend the public hearing.
Dillon: Okay, so we weren't.
Al-Jaff: They did talk to us prior to the public hearing and after it was approved we also talked
to them.
Dillon: So what if the city said to the historical society well that's fine you feel that way but we
think this tower can be here. Then what?
Al-Jaff: Then you go through arbitration.
Dillon: And is that an option?
Aanenson: Sure. You can recommend what you like. But we're recommending that it get
approved at this location. But you can modify our recommendation.
Dillon: That's all the questions I have.
12
147
Planning Commission Meeting - November 6, 2007
McDonald: I guess the only question I've got is when this came before us before, there was the
issue about Outlot A and the encroachment by the nursery into that. Is that still an issue?
Al-Jaff: Encroachment by, I'm sorry?
McDonald: By Halla Nursery.
Al-Jaff: That is still an issue and they have cleaned up the majority of what was stored out there
but it's by no means complete.
McDonald: And as I recall, no tower was going to be built until that issue was resolved, correct?
Al-Jaff: Correct. That's still the case.
McDonald: Okay.
Al-Jaff: And it's still a condition of approval.
McDonald: Okay. I have no further questions at this point so I guess what we'll look at is we'll
open it up to the public and anyone wishing to.
Papke: The applicant first.
McDonald: Oh, I'm sorry. Getting ahead of myself. Yes, we'll hear from the applicant. If you'd
like to come forward and if you have any additional information you feel that we should be made
aware of.
Steve Edwards: Hello. Mr. Chairman and commissions, my name's Steve Edwards. I'm here
tonight representing T-Mobile. And I do have some representatives of Pinnacle Engineering
who handled the 106 process with the State Historical Society and they're going to touch base on
that. I would like to thank the city staff for putting together a presentation and working with us
through this process. The only thing I really have to add to the, what hasn't been mentioned
tonight is I did touch base with Cingular Wireless which is now AT&T. Prior to this they were
interested in going on it, that we were looking at the first location, and they're still going to
proceed with us if this is approved so we will be meeting the intent of the ordinance to reduce the
number of towers by co-locating other cellular carriers onto this tower. And that, that process
that once, or if this is approved, Cingular will approach, or AT&T will approach the City to go
through that process.
McDonald: Okay. Kevin, you have any questions? We'll start.
Dillon: I don't have any questions for the applicant.
McDonald: Kurt? Dan?
13
148
Planning Commission Meeting - November 6, 2007
Keefe: Yeah, I'm curious about tower design. What are you guys doing on that because you
guys make a lot of money off these things and you know, are there any advancements in color
design? I mean that's really the primary issue here.
Steve Edwards: Well that's a question I get asked quite a bit. The next question usually comes
up is what about a tree. And the truth is, when you're putting a 145 foot object into the air and it
looks like a tree, it doesn't move. It doesn't, the leaves don't change. It draws more attention
than a regular tower does. When all the other towers, or when all the other trees around it are 65
feet. All of a sudden here's something that's 145 feet. It draws your attention. Whereas, I know
it's difficult to understand and if you don't know what you're really looking at when your view
shed goes across in an area where there is a cell phone tower, you don't always pick it up. In this
case right now with the color that we're looking to do it, which is kind of a lighter blue, I think it
will fade into the sky a little bit. But it is something that has become part of our everyday views
that we do see these, they are all around us and unless somebody really points out, you don't
really pick them out that quickly. So to answer your questions, due to the engineering and the
impact that they have, they actually have something that can deliver the signal. There isn't really
any technology coming down the road that looks like it's going to change what we have to utilize
in these cases.
Keefe: Yeah, like our power lines now. They now go underground but we still have towers that
we have to deal with for the cell service. Okay.
Thomas I don't have any questions, thank you.
Larson: Well it's, one of the comments when you're turning it into a tree idea. I mean I've seen
them. The West has them. They've got palm trees and pine trees and you're right. They look
stupid. Because all of a sudden you'll be going and there's a whole row of pine trees and all of a
sudden there's one that looks like this.
Steve Edwards: I spent a couple years working in Florida where we put up a 120 foot tree and
we had more complaints about that tree than any other site we've ever put up so.
Larson: I mean the palm tree ones I think blend a little better just because they are straight but.
Steve Edwards: But then you're looking at a 30 or 40 foot site. Not.
Larson: Right. Yeah, not 100 and, okay. That's all.
McDonald: Mark.
Undestad: I'd just be curious to hear…
Steve Edwards: Yeah, he's more familiar with the process so I think I'm going to turn my
question over to our engineer from Pinnacle Engineer.
14
149
Planning Commission Meeting - November 6, 2007
John Landwehr: I'll do my best to answer your questions. My name is John Landwehr. I'm with
Pinnacle Engineering and we are the folks that have been working with T-Mobile to get through
this process so. Help me out with what specifically your question is.
Undestad: Well the issue of going with the historical preservation now, before and then
Commissioner Dillon's comment too, I mean the arbitration deal and have you ever gone through
that with the State on historical issues…
John Landwehr: Okay. I'll do my best with that. The order of events that go through to put up
the cell tower generally a lease agreement is sought out before the geotechnical work is done and
before what's called a NEPA checklist is completed. And a NEPA checklist, which includes
working with the State Historic Preservation takes a period of time not less than 30 days to get a
response. So, and then part of the NEPA checklist is with wetlands, tribal issues, and other
things like that. So it's a process that takes about 105 days from it's inception and commonly a
property will be secured and to the best of people's knowledge they will do an overview of the
property, in this case the Vogel house was not on the State list at the time that this all began so it
became eligible but it wasn't on the list, so it wasn't an oversight. It was simply not on the list at
the time that this process started. So when the letter went into the State SHPO office to request
the approval for the location, that's when the rest of the information came out. So since that time
you know we've done a crane test. We've done a handful of meetings. We've tried to find what
would be the most reasonable solution to finding cell service to a community that does not have
it, which at times can interfere with 911 and other emergency services who do not have it. And
this seems like the most reasonable solution was to work with the property owner to find a
different location on his property that would still allow a tower.
Undestad: Just to back up. The State when, when everything was approved before, was
approved properly? There was no…
John Landwehr: Nothing was approved at the State level.
Undestad: But the house didn't, wasn't on the historical list?
John Landwehr: It was not on the list.
Undestad: And now it is?
John Landwehr: Correct.
Undestad: …so when you did your application before you checked with the State, the house was
not on the list. That location was okay at that time?
John Landwehr: It was not on a published list but it was eligible. So the way the 106 criteria
works is your initial screening is simply to see if you are in a historic district and if there is
something there. It didn't show up on a list so we didn't know. Until we did, once the property
was secured, then a more in depth review was done and that's when it became aware.
15
150
Planning Commission Meeting - November 6, 2007
Undestad: But when you say eligible, you knew it was out there but maybe it was on the list,
maybe it wasn't? I don't quite understand it was eligible but it's not on a list but you didn't see it.
John Landwehr: There's a list that's published that tells you that, that there is a historic site. It
was not on that list. When we got to the local level is when it became aware. At that time it was
petitioned to be part of the State's consideration. So there's no way to know those things until
you get down to this level. I hope I answered your question.
Undestad: Okay.
McDonald: Well, I've got a couple questions.
John Landwehr: Wendy can help a little more on that in a moment.
McDonald: I've just got a couple of questions and I guess my concern in all this is that it seems
it was pretty easy to move this site to the west. My only complaint about this was why weren't
we given a selection of sites to begin with. I mean one of the things that came in with all of this
was there was a lot of concern about the visual impact. We agreed to go through because you
know the way that I voted on all of this was, well this is probably the best site and I was relying
upon what was brought before me. To move this thing 500 feet to the west.
Steve Edwards: It's 200.
McDonald: 200. Says there must be a lot of spots around there that this thing could have been
placed and it could have minimized the impact to the community. And I'm not asking you to
design a tower that's going to blend in because I know that's not possible. But the thing is you
can minimize the impact. Why weren't we given a number of sites? Why wasn't this brought up
so that we could have made maybe a little bit better decision as far as the impact of this tower on
the community.
John Landwehr: Within the property boundaries of the specific property owner?
McDonald: Well, I'm beginning to think there's probably other sites outside the property. I'm
okay if you want to put the tower on that particular piece of property. But there's evidently a lot
of places on that property where the tower could have gone and it looks as though some of those
places have minimized the impact of the visual effect of this upon the community. And that's the
only complaint I've got that I'm not sure if it's aimed towards you or towards staff or towards
maybe it's our process, that something should have been done because emotions got a little high
that night and the big thing was about the impact. And now to come in here and say oh, 200 feet
to the west. No big deal. Why wasn't that brought up before? I mean it takes something such as
a historical impact upon a particular house and then all of a sudden we're willing to change it?
It's just, I'm just a little perplexed as to why that wasn't brought to us before. And I guess with
that, that's the only comment and the question I've got, I'm not sure if you can actually provide an
answer or not but yeah, I'm a little upset with the fact this is coming back in here after everything
that we went through at that meeting.
16
151
Planning Commission Meeting - November 6, 2007
John Landwehr: I can answer part of your question. I wasn't here for those times so I can only
speak to what I know. There isn't a lot of locations. In fact it was quite difficult to find another
location that would work both from the radio frequency standpoint. Setback requirement.
Property owners. All those things that go into it. I don't know that I would say that there's a lot
of places it can move because it was rather difficult to find this one location. We had like I say a
number of meetings to try and find an alternative and this alternative is strictly driven by the
State Historic Office's request, demand that it not be at it's original location. I think somebody
here earlier on stated that it is kind of a trade off. Either the historic home or some other homes
are going to see this tower. New homes that get built, it will probably blend into their landscape
and they probably won't notice it as much. But I don't know if you want to address any more of
that about the location but we've struggled for about a year and a half to try and find a location
and it has not been an easy process to try and find something that would be suitable both to end
up with an RF signal that provides some benefit, and to appease everybody's needs so it hasn't
been easy. Those things while being considered and it took some effort to find this second spot
to even attempt this.
McDonald: Okay. Well I appreciate the effort to answer the question but you have to admit that
you know, why kind of hangs out there is that without knowing anything about how cell towers
work, you talk about the RF energy and the footprint of all of that, to most people that's going to
go over the top of their head. I understand that you've got to have certain criteria in order to
place a tower but I'm just kind of disappointed that that wasn't explained a little bit better and
you weren't able to defend the current site. You know we're probably getting off track and I
don't mean to do that but yeah, I am just a little concerned with the way we've come back in with
another site to alleviate all these problems before so. At this point now I'll open it up to the
public. To anyone wishing to coming forward and address the commissioners. All I ask is that
you state your name and address and address your comments to the commission.
Wendy Biorn: Commissioners, my name's Wendy Biorn. I'm the Executive Director of the
Carver County Historical Society. Tonight I not only represent the Carver County Historical
Society but also the Preservation Alliance in Minnesota and the Minnesota State Historic
Preservation Office at the Minnesota Historical Society. You asked a little bit about 106. I
guess I'm the person to answer that question. Basically any time there is a federal agency
involved they have to go through SHPO. The 106 essential and 106 has to do with historic
property. And the reason they hadn't done it yet because they had to go through the first step.
Once everything is approved, then they go through the 106. The Vogel property itself is not
listed on the National Register and is still not, but it is eligible. And as such it has the same
rights as if it was registered on the National Register of Historic Properties. Just because it's not
on the National Register, it is eligible and has the same rights and obligations and you have to
protect it as such. Dennis…the State Historic Preservation Office made the determination on
that. So they had a 30 day period after T-Mobile then applied to SHPO, Dennis came out, as I
was there too and they did the crane tower test. At that point he made the determination that it
had an adverse affect on the property, which then threw it back. So that probably answers a lot
of your questions for you. As far as the second location in working with Sharmeen who's been
absolutely wonderful working with her. The whole office has been. T-Mobile has been, and
Pinnacle too. And so we've been through a lot of meetings on this. My understanding that
looking at the different locations, to answer some of your questions. I had the same question that
17
152
Planning Commission Meeting - November 6, 2007
you did. I just became involved in this in April, is have we looked at all the other locations?
Why weren't they brought forward? On the property where we were looking, there was actually
one triangular little piece, but Sharmeen can probably answer a little bit better, that was an
alternative location which was the second spot that we determined was, would not adversely
affect the Vogel property. That's the second spot that is being recommended by SHPO and by
your office, so that answers some of those questions. If you have any questions for me regarding
that, I'd be more than happy to answer.
Dillon: Who determines what's an adverse affect and what are the criteria for that?
Wendy Biorn: It could be anything from, in this particular case, visual. It could have an adverse
affect as is a road was coming too close to it, and it doesn't have to be just the property. As in
the house. It could be the land surrounding it as well. Going on right now I'm working with
Minnesota Department of Transportation, and a wayside rest owned by the City of Chaska. And
as they put the road through there it's getting land surrounding that wayside rest which is also
going on the National Register. It too has to go through the 106 Group in order to pass
everything because it is, will be put on the National Register and available just like the Vogel
property. This is something that was put into effect by our First Lady actually not too long ago
as far as the 106 Group.
Dillon: It sounds somewhat subjective to me.
Wendy Biorn: It is somewhat subjective. I guess if you look at it and say how does it adversely
affect the property, there is a list of criteria and I don't have them with me but how it over
shadows the property. How it visually impacts the property is one of the things that are on there.
I wished I had know that ahead of time, I could have brought some of that with. I just finished
the 106 essential course less than a month ago.
Dillon: Because I've been by Halla Nursery and in my mind that's 10 times the eye sore this
thing would be, and that's right across the street. And so, and that was built I don't know how
many years ago but maybe this thing wasn't even being contemplated for the history at the time
that that store was put in.
Wendy Biorn: Well the key there is that when Halla Nursery, did they have federal agency
involved in building that nursery? I would bet the answer is no. A federal agency must be
involved to invoke the 106. In this particular case the FCC was involved, which is a federal
agency. When a federal agency becomes involved, the 106 essential. 106 Group is involved.
That's the difference.
Dillon: Okay.
Wendy Biorn: I was going to, we are very encouraged by the flexibility that T-Mobile has been
willing to do in relocating the tower. I know it's only 200 feet but it does make a difference and
unfortunately it does affect other homeowners. There's no way around that. And from a historic
aspect of things we have to look and follow the National, and this is a national thing. A rule that
must be followed and that's where the 106 comes in. It's a federal thing. They happen to
18
153
Planning Commission Meeting - November 6, 2007
determine too, be eligible for the National Register of Historic Properties and therefore has been
identified as a property worthy of preservation. They will be listed on the National Register and
that is part of the thing with T-Mobile as well. Do you have any questions?
McDonald: Thank you. You answered everything for us. Thank you.
Wendy Biorn: You're welcome.
McDonald: Does anyone else wish to come up and comment?
Gary Anderson: My name's Gary Anderson, 725 Creekwood and I'd just like to say that moving
that tower, I've heard 500 feet. 200 feet. The 200 feet would be right in my picture table where I
look out and that's where I write property tax to you folks every year for the last 35 years. To
pay taxes. I look at this saying that council should take a look at this and say, there's no reason
to have a cell phone tower in this area. I know there's progress in the city. I looked at, I spent 2
hours today looking at the 2030 comp plan. If you look in that, there's a historic chapter in there.
I think we all need to take a look at that. I look at that property that's proposed for 2010, that's
all low density housing. In 2010. That's 2 years. That means 4 houses per acre. In that area.
And it's all proposed for 2010. So I'd like to take, everybody take a look at this. I mean you
have a responsibility or just, not to the historical society but to the folks that pay the bill. You
know the guy, people that have been here for 30 plus years and I hope that you would do that. I
ask you, why doesn't the city have a tower on your property? Why don't we get the $5,000 for
taxes? Mr. Thomas made an excellent point. You know why there? Why not on a park,
Bandimere Park? Why, when we put in a commercial area along 312. I know the Vogel sisters
were out here last time. You know their family was the ones that had that house. And…
Aanenson: They did stop up last week.
Gary Anderson: Yeah, they were there and they're sick over it. Very sick over it. So if we take
a look at their plan that we have with the city, 2000 comp plan and you take a look at that, we're
going to go with that, then I think we'd better go with that. The prior meeting that you had with
the setbacks, that you had a meeting with just a little bit ago. I could see where people are up in
arms about. Right down below the hill, the Golf Zone, there's a conditional use permit there. No
fertilization. No herbicide. No fungicide. Ladies and gentlemen, they can build a golf course
like that without any of those, then they should be in consulting because you know what's going
on there. It's called regulation and it's your responsibility to make sure the regulations are taking
place. That's all I have to say. Sometimes you have to stand up and do what's right for the
community. The people that pay the taxes. Not just big companies. And that's all we expect.
Thank you.
McDonald: Thank you. Does anyone else wish to make comment?
Chrisann Arndt: I'm really nervous. I'm not used to speaking in front of groups so bear with me.
My name is Chrisann Arndt and I live in the historic August Vogel property. And first and
foremost I want to say thanks to everybody and listening to us as far as trying to move the cell
tower. When we purchased the August Vogel Farm back in '92 ironically one of the very first
19
154
Planning Commission Meeting - November 6, 2007
things that we did was bury all the electrical wires and anything that would possibly make the
property look modern day. We've been restoring the house for 15 years now back to the way that
it would have looked in the 1800's. And it's kind of been an undertaking that has come out of our
pocket. We never looked for any grant money or anything like that. It was a project that when
we first saw the August Vogel house, we just felt that it was a gem and I've been involved with
the Carver County Historical Society in the past as a board member and I have also attempted to
try to get the property on the National Register which now the ball is finally rolling. I've talked
with people from MnDot about the property because of the very first and major concern that I
had was the fact that the house would be taken with any type of 101 road improvements and I
was pretty much rest assured that it would not be. Right after that happened, then the cell tower
issue came up and it was just really upsetting to me to think that you know, that house is
probably one of the most viable, if not the most viable historical piece of property that the city of
Chanhassen has. And that the work that we've put into that house for the last 15 years has been
work that we feel that at this time we're just caretakers of that house and that that house is going
to out live my husband and I and it's going to be there forever and that is actually a real asset to
the city and who knows, maybe one day it could be a museum or some type of an interpretation
center. I know from talking to Wendy that the City of Chanhassen is trying to get something
going on with the you know, their own chapter set up with the historical society and we don't
have a lot of historical properties in the city of Chanhassen. And we really need to consider the
fact that a cell tower sitting in the back yard of this historic property is really going to have an
adverse affect and that I mean, even by moving the cell tower 200 feet, I'm still going to see the
cell tower. Everybody in that neighborhood is still going to see the cell tower but it's not going
to be like right in the back yard to where when you pull up and you see this beautiful piece of
property. Here's a cell tower like right there and so that's why I was for moving the cell tower
because of the effect. Because I really, really think that that house is going to be there for a long
time and I just want all of you to realize that it's a fabulous piece of property and I invite all of
you to come out and see what we've done to it and it will be on the National Register someday
and it is definitely going to be there for a long time and I just want you to consider that and
consider the adverse affect that a cell tower would have on the property.
McDonald: Thank you. Does anyone else wish to come forward?
Jim Sabinske: Jim Sabinske, 775 Creekwood. My concerns is just like you Dan on they found
the site real soon after they couldn't have the site that they had, so I believe they didn't look very
serious about a place to plant the tower. So, and what Mr. Anderson said, he pretty much spoke
for the whole neighborhood up there you know. You guys it's your responsibility pretty much to
see what goes on and take a good look at it because people out there, the ones that's paying the
taxes and make the machine run. I advise you to look pretty serious at things. Thank you.
McDonald: Thank you. Does anyone else wish to come up and make comment?
Steve Edwards: I think I just need to make a point of clarification. From the location that we
first selected to the location we're looking at now, it is a move of 500 feet. The tower, you first
looked at the crane test was taken at a 200 foot distance. And the setback to that property weren't
actually taken into account when they were looking at that. If you do look at the actual property,
it's an oddly shaped property and we are required to continue to maintain the 150 setbacks that
20
155
Planning Commission Meeting - November 6, 2007
are required on the property. And the other locations we did look at over about a 2 1/2 month
investigation of the area, looking at the different areas of the property. Trying to keep it away
from the residential properties as much as possible, while also maintaining the setback to all the
different boundaries so it actually was quite a process to find the location we're in now to meet
the historic preservation office's requirements. To meet the city's 150 foot setback requirements,
and also try to keep as much out of view shed of people's main windows as possible.
McDonald: Let me ask you a question. 500 feet. Is that 500 feet from the Vogel house or 500
feet from the location where it was originally?
Steve Edwards: 500 feet from the location it was originally sited.
McDonald: Okay.
Larson: Can we point out where it was and now where it is, compared to where it is?
Aanenson: It might be easier on the color photo Sharmeen.
Steve Edwards: Approximately right here. There's 150 feet off this setback and 150 feet off this
setback.
Audience: …access to this property?
Steve Edwards: It will be off Creekwood Drive.
Audience: And you'll have the same access that you had prior?
Steve Edwards: At this time I'd have to go back and look where the prior access was.
Someone in the audience was asking questions to Mr. Edwards regarding the location of the
access.
McDonald: I guess I would ask you, if you want to make comments from the back, what you
really need to do is to come up to the podium because otherwise this doesn't get onto the
television. This is a public meeting. No one can see you back there so if you have comments to
make, I would ask that you come up here and re-address everyone.
Steve Edwards: It appears that we are using the same access.
McDonald: Okay. Debbie, you had a question?
Larson: Well just to bring up what one of the residents had said is there a reason why the
location's closer to the 312 corridor or Bandimere were not considered for this tower as opposed
to where it is going now?
21
156
Planning Commission Meeting - November 6, 2007
Steve Edwards: We did investigate the Bandimere Park, which I believe is also the nearest city
owned property to the area. And once again to meet the city setback into that park, we'd be
looking pretty much to put the tower in the center of the property was in one of the ballfields,
and that also takes away from our objective of 101 and covering that area. Pardon me while I get
my bearings on these. We did quite a bit of paperwork preparing. So this demonstrates the
location of the proposed site there in the center surrounded by our current coverage in the area.
Larson: Is the coverage in yellow?
Steve Edwards: Coverage is in building and car coverage is in red. In car coverage is in yellow.
And the gray area you start getting into a somewhat shaky area. You start running into dropped
calls and such. Now this is the proposed coverage. This is actually at the first location. I mean
we'd be moving this slightly 500 feet back, which would impact this coverage area over here, but
would still cover the objective we'd be looking for.
Larson: So where's the 312 corridor? Further north?
Steve Edwards: I believe that runs next to the Vogel property.
Larson: Was that already covered? Is that why you didn't consider going up closer to that? As
far as your coverage area. I mean I can see there's an obvious void here. So this location, from
what I see here, gives you a better coverage of non-covered areas?
Steve Edwards: Correct, and 101.
Larson: I'm hoping that will answer the question for the gentleman in the back too.
Keefe: My question was really along 212 as well. Why there isn't a site along 212 because it
sure would seem like there'd be something. It might be more for a commercial line than
residential.
Aanenson: It's not zoned currently yet.
McDonald: All of this should have been covered before and a lot of it was but when you come
back, we re-open things that I know you're not prepared for because in the first presentation there
was a lot more coverage maps and everything and they're not here because this is just an
amendment but when you come back, you re-open questions. Did this, this was really the part of
the public hearing portion of it. If you're finished with your comments, go ahead and sit down
and if anyone else wishes to come up, come on up.
Gary Anderson: I just wondered, how long is the lease again on this?
Steve Edwards: 30 years.
Gary Anderson: 30 years. Is there opt out in this lease agreement between you…
22
157
Planning Commission Meeting - November 6, 2007
Steve Edwards: Between T-Mobile, yes.
Gary Anderson: T-Mobile and the applicant? So T-Mobile has the right to opt out? Within that
access to that property…would that property then be valid for development of low density then?
Aanenson: Where the T-Mobile site is going?
Gary Anderson: Well with the access, where it is going now and where the tower's proposed to
be.
Aanenson: It would have impacted because there's setback requirements from a tower so that
would be taken into consideration at some time in the future when there's building applications.
Gary Anderson: And also with the access? With the road going to the.
Aanenson: Correct. Those would be taken into consideration with the subdivision. They'd still
have to maintain an access to those, if and when that property, and just to clarify, I believe that's
2015. Not 2010.
Gary Anderson: I believe it says 2010.
Aanenson: I'll double check on that.
Gary Anderson: On the north side of Creekwood it says 2010.
Aanenson: Um, that could be true so. But even so they would still have to maintain an access to
that and there's a setback requirement of half the distance of the pole height.
Gary Anderson: So that property would…
Aanenson: No. They'd still have to meet the setback requirements. It could be.
Gary Anderson: …to get into that. I mean if you look at that access and the.
Steve Edwards: The access is, the way it's worked out…the access, as long as we have access to
the pole. It doesn't matter how, if the property's redeveloped, how access continues. So if for
some reason streets would go through there, how it would develop…as long as we were provided
access to the site. Our access wouldn't change.
Gary Anderson: And then there's a concrete pad underneath this tower. Who's responsible,
because we don't want to get into the same thing when we did the water department. When we
had to dig up and we found a concrete barrel. A drum there from the cement mix. Who's
responsibility to dig up the footings?
Steve Edwards: The agreement that T-Mobile will remove the footings before…
23
158
Planning Commission Meeting - November 6, 2007
Gary Anderson: And how deep is that footing now?
Steve Edwards: It'd probably be about 20-25 feet.
Gary Anderson: And so there's going to be 21 feet of concrete underneath the ground. And how
big is that pad?
Steve Edwards: It'd probably be about 8 by, 6 by 8.
McDonald: Okay. Any further comments or anything that anyone wants to come up and address
the commissioners. Seeing no one get up, this meeting is closed and I'll bring it back up for
discussion amongst the commissioners. Kevin, start with you.
Dillon: So you know I mean I agree with the commissioner that, the Chair that it would have
been great to have all this sorted out the first time around but understand the events of the
historical society and all that. You know I guess, my take, I'm in favor of this being, if this
comes to a vote, I'll probably vote to support the staff's recommendation on this but again the
other thing is, I mean we've heard from a couple of people that are, you know are kind of against
this and you know they've made comments on board and they say we speak for the neighbors.
Well where are the neighbors? If everyone's so upset about this being moved, and we've heard
from 2 people that are kind of like against it and is that big of a deal, then you know as a
planning commission member, I'd like to know. But no one's telling me otherwise. There's 2
voices out of, you know there's like 20 property owners that were advised so I mean, if you want
to I guess the message is, you know if you want to have a stake in the future, you've got to show
up.
McDonald: Kurt.
Papke: It seems like a reasonable compromise and I'm just very happy that the Vogel property
owner seems happy with the outcome here so I think that's a good outcome.
McDonald: Dan.
Keefe: Yeah I'm not, I mean I'm not sure I'm in complete agreement with the conditional use
findings. You know like I say, you know particularly concerned about is number 3. Will be
designed, constructed, operated and maintained so it would be compatible in appearance with
existing or intended character in the general vicinity. I'm not so sure I agree with that finding but
I guess that's my comment.
McDonald: Kathleen.
Thomas: Yeah. I understand the amendment and I understand where we're going to put it on the
property and why, I just have a hard time with Section 106 being that I've got, we went through
all this back in April and then it gets completely put through and then, because the house could
be eligible to be on that list, but it's not on the list but it could be on the list, I just have a hard
time with that. I just, I prefer something that it was not like that so we could make sure that
24
159
Planning Commission Meeting - November 6, 2007
when something gets presented to us that there's no way that it's going to have to come back and
be, it could have been on the list somewhere, sometime so. That's it.
McDonald: Debbie.
Larson: Well, I'm kind of glad that they have come to some sort of mutual agreement to move it
over. Whether it be 200 or 500 feet, whatever that is. As far as not having it at all, I'm real
surprised that that's even being brought up tonight because it's already been established that it's
going to be somewhere. And it's not like we're going to not do it. So I guess I am in favor, since
it seems like the Vogel house is happy with the outcome of the other so it's not in their view.
Beyond that, I think the other arguments of not having it any more, or anywhere because we
don't need it, well unfortunately cities change and Chanhassen is growing and I see this as an
improvement so I would be tending to vote for it so.
McDonald: Okay, thank you. Mark.
Undestad: No comments. I'm in agreement here.
McDonald: Okay. The only comment I'll make is just to kind of re-emphasize. When you bring
something such as this, and this is not the only thing that comes up that's controversial. The
planning case before was and I guess what I've learned about this is that you know, going to ask
a little bit more tougher questions next time. Demand a little bit more proof about why
something needs to go where it does. I agree, the cell phone tower becomes a necessity. It's, the
benefits far outweigh the detriments of the visual impact upon the area. I mean in this day and
age you need cell phones. Emergency communications. All kinds of things. It's just, that's the
kind of world we live in. It's a wireless world and it's going to become even more and more
ingrained within the society. I just feel a little bit duped about the whole thing because again
with what we went through back in April about people complaining that this was in their sight,
that still bothers me quite a bit. You know I'm in favor of the tower. I'm not going to vote
against it because you need the coverage but I just think that something such as that would have
made it a lot easier. You know you've got a little bit better acceptance I think this time around
and I agree with Kevin. The turnout is not what it was before so I have to take that into
consideration. That's the only comment I've got. I'm not sure what staff can do about it. I
understand the federal implications of all this. There's nothing the city can do until, we just pass
things on and you never can tell what's going to happen at the next level so I don't see where the
city did anything wrong or the staff didn't do their due diligence or something. But I'm feeling a
little bit more angry towards the applicant than I am with anybody. Enough said. I'm willing to
accept a recommendation from the commissioners.
Undestad: I'll make a recommendation. The Planning Commission recommends approval of the
amendment to the Site Plan Permit 07-04 for a 149 foot telecommunication tower and a 6 foot
cedar fence as shown on the site plan received October 5, 2007, subject to conditions 1 through
10. And the Planning Commission recommends approval for the amendment to the Conditional
Use Permit 07-04 for a 149 foot telecommunication tower as shown on the site plan received
October 5, 2007, subject to conditions 1 through 7.
25
160
Planning Commission Meeting - November 6, 2007
McDonald: Do I have a second?
Dillon: Second.
Undestad moved, Dillon seconded that the Planning Commission recommends approval of
the Amendment to the Site Plan Review #07-04 for a 149-foot telecommunication tower and
a 7-foot chain link fence with 3 rows of barbed wire as shown on the site plan received
January 19, 2007, subject to the following conditions:
1. The applicant shall enter into a site plan agreement and submit financial security to guarantee
the improvements.
2. Clearing for the tower and equipment pad shall be no greater than 15 feet from the edge of
the pad.
3. A maximum of 25 feet is allowed for clearing the access road to the site. Trees shall be
preserved to the greatest extent possible.
4. The applicant shall install a minimum of eight Black Hills spruce around the equipment
platform. Trees shall be at least six feet in height.
5. Site grading and vegetation removal shall be minimized to the greatest extent practical. If
any excess material is anticipated to be generated as a result of access road construction, the
disposal location must be approved in writing by City staff prior to road construction.
6. A rock construction entrance complying with the City’s standard detail (#5301) shall be
included on the Erosion and Grading Plan and shall be constructed prior to the remainder of
the gravel road.
7. If applicable, the applicant shall apply for and obtain permits from the appropriate regulatory
agencies (e.g., Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control
Agency) and comply with their conditions of approval. (Watershed district and MPCA permits
are necessary if the total disturbed area is in excess of 1.0 acres).
8. The monopole/tower shall be moved 25 feet to the west for a total setback of 175 feet and
maintain a minimum of 150-foot setback from the north, west and south property lines.
9. The driveway off of Creekwood Drive may not be used to serve nor access the Halla Nursery
commercial operation.
10. Building Official Conditions:
a. A building permit is required to construct the tower and equipment platform; the tower
must be designed for a wind load of 90 MPH for 3 seconds (ref. 2000 IBC, Sec. 1609)
and include the effect of one-half inch of radial ice (ref. MSBC 1303.1800).
26
161
Planning Commission Meeting - November 6, 2007
b. The plans (tower and platform) must be signed by a professional engineer licensed in the
State of Minnesota.”
c. The contractor shall meet with the Inspections Division as early as possible to discuss
plan review and permit procedures.
All voted in favor, except Keefe who opposed, and the motion carried with a vote of 6 to 1.
Undestad moved, Dillon seconded that the Planning Commission recommends approval of
the Amendment to the Conditional Use Permit #07-04 for a 149-foot telecommunication
tower and a 7-foot chain link with 3 rows of barbed wire as shown on the site plan received
January 19, 2007, subject to the following conditions:
1. The applicant shall enter into a conditional use permit agreement and submit financial
security to guarantee the improvements.
2. The tower shall comply with the requirements in ARTICLE XXX. TOWERS AND
ANTENNAS of the Zoning Ordinance.
3. The tower shall not be illuminated by artificial means and shall not display strobe lights
unless such lighting is specifically required by the Federal Aviation Administration or other
federal or state authority for a particular tower.
4. No signage, advertising or identification of any kind intended to be visible from the ground
or other structures is permitted, except applicable warning and equipment information
signage required by the manufacturer or by Federal, State, or local authorities.
5. The applicant shall submit documentation at the time of building permit application showing
the height above grade for all potential mounting positions for co-located antennas and the
minimum separation distances between antennas. A description of the tower’s capacity,
including the number and type of antennas that can be accommodated should also be
provided.
6. The monopole color shall be the brand “Tnemac” and the color “Blue Elusion”.
7. All outdoor storage associated with the Halla Nursery and located within Outlot A, Halla
Maryanne Addition, shall be removed prior to issuance of a building permit for the tower and
the area shall be revegetated.”
All voted in favor, except Keefe who opposed, and the motion carried with a vote of 6 to 1.
PUBLIC HEARING:
COMPREHENSIVE PLAN: CHAPTER 3, HISTORIC PRESERVATION AND
CHAPTER 4, HOUSING ELEMENTS.
Aanenson: It's kind of a nice segway to talk about historic preservation, we go into that. I think
we did learn something in this process. Whether something's on the eligibility or not, we know
27
162
Planning Commission Meeting - November 6, 2007
now if it needs a federal permit, whether typically we think about that as roads. Now we know
for cell towers, so what we would do if this was to come in again today, we would not have the
hearing until they've gone through that process. We can ask for additional time to make sure it's
a complete application so we'll take some of the responsibility for that mistake or permitting it
and, because it creates ill will and I think if we had known about that process, we certainly would
have asked for additional information so from now on when we know there's a federal permit,
the historic preservation does come into play, which is kind of a segway into why we're looking
at identifying historic properties, which we haven't necessarily done in the past. We know there's
some out there but really doing a more thorough job in working with the county. We did notify
the residents, or this was published in the paper, that these two sections of the plan are being
covered. Last night we did have a neighborhood meeting with some of the residents in the
southern end of the city. Specifically talk about the staging of the MUSA, the change that was
brought up by Commissioner Papke last time so we had a really good turnout last night so we'll
bring that information back to you in the land use section as it relates to that. But with that, I'd
like to turn this part of the historic portion of the comprehensive plan over to Sharmeen and then
I'll talk about the housing chapter.
Al-Jaff: This is the first time that the city has included the historic preservation element in the
comprehensive plan. With the rural portion of our community ready for development and the
desire to preserve the city's history, it is the appropriate time to formalize the city's goals for
historic preservation. Looking at this map before you, in 1854 Chanhassen became the first
township within Carver County. The area has a history that dates back about 150 years. In the
city of Chanhassen and when we are looking at historic properties we will be focusing on
buildings and places that are unique, time sensitive, culturally or socially important, or
architecturally significant. So our goal is to promote the preservation and protection of valuable
historic and cultural resources through community partnerships and collaborations with citizens,
non-profit state, federal, public and private entities. One of the things that we have attempted to
do is work very closely with Carver County. Carver County was awarded a grant. They hired
the 106 Group to identify historically significant sites. This process included sites listed on the
National Historic Places and we do have St. Hubert's, old St. Hubert's is one of the buildings that
is listed on the National Historic Places. Sites that are eligible for National Register of Historic
Places, which is what we learned during this process, and with each one of those there would be
a photo incorporated into the research that they would be doing. The 106 Group has phased their
study into baseline data. And at this point they have collected all of the data. We have worked
very closely with them on this stage, basically identifying where all of the historic properties in
Chanhassen is located and the age of the structures, significance of them. We've tried to
summarize everything for them. Over the next month or so we will have some meetings with…
basically developing priorities as to how should we delve further into each aspect into each
property. How do we gather additional information and then the final stage would be to identify
and evaluate historic resources that are significant to the heritage. As I mentioned earlier we
have inventoried the city's historic aspects and here is an example of what we did from, was
create a map that, the first 40 years of the city was simple enough to put on one map. After that
we started going onto.
Aanenson: Did I go too far?
28
163
Planning Commission Meeting - November 6, 2007
Al-Jaff: No, keep going.
Dillon: Hey, what's that in the background there?
Aanenson: Took me a minute.
Al-Jaff: One of the other things that we are trying to accomplish is develop and maintain a list of
historic sites and structures within the city. We want to develop and maintain an interactive web
site link of historic inventory between the city and the county. We would like to enter that, we
can incorporate historic sites into new subdivisions or developments where possible. Encourage
the preservation and adaptive re-use of structures of historic and architectural significance. This
is the home depot and you can actually see it out.
Aanenson: Did you mean Chan Depot? …while Sharmeen catches her breath, because she's got
a terrible cold. This is one where we actually moved when we did a road project. When we did
the Highway 5 frontage road. We did the environmental impact. This was sitting on a property
out on Highway 5, or the new location of the frontage road. West 78th Street, so this did come up
in SHPO. We're familiar with that process. Unfortunately we weren't familiar with the cell
tower process so this was relocated to be historically correct. Adjacent to a railroad track and it's
on the Dinner Theater property. Do you want me to switch slides now?
Al-Jaff: And encourage development of buildings that compliment historic buildings and in this
case the Goddard School as well as Remax compliment the St. Hubert's, old St. Hubert's church
design. Again we want to stress that we will be working with Carver County very closely. We
will consult Carver County Historic Society on any issues that come across. We will encourage
properties, requesting historic designation or funding, we will direct them to Carver County
Historic Society. One of the programs that we would like to start in Chanhassen is recognizing
historic properties and that would happen on a voluntary basis. If the homeowners, the property
owners are interested, then we would work with them very closely. And if you have any
suggestions, any additions that you want to see us incorporate into our policies, we would
welcome any feedback from you.
McDonald: Does anyone have any questions or comments on that? I guess I've got one for you.
This is all nice, you know to be able to identify all of this and everything. You've got St.
Hubert's that's sitting down here that's been identified. It goes back to the beginning but yet
nothing is happening and as a result the building, you know from my perspective of looking at it,
is deteriorating. What's the role of the city in all of this? You know are we going to step in and
do something to preserve these? Are we going to find someone to preserve these or, otherwise
why are we doing this?
Aanenson: Well for one, for example what happened tonight. So we would identify something
that's on the Register. If somebody came in with an application that required a federal permit,
we would know that there's a correct process to go through that. I mean we wouldn't go through
the painstaking process of giving a conditional use and site plan approval when we didn't have
all the facts.
29
164
Planning Commission Meeting - November 6, 2007
McDonald: That's a good example of what I'm talking about. You had private entities that
moved in there, took it upon themselves to rehabilitate that property to get it to a point where
now it's worthwhile considering things like what's a sale going to do to the property.
Aanenson: But my point is that if we know where they are and they would affect the process,
that's information we should have before we say it's a complete application so that would be the
knowledge. The City, it's my belief doesn't want to get into trying to own and manage all these
you know. What we want to do is work with the county to be the pass through agency for that
funding and, it takes a big staffing level and a commitment and the county's got that process set
up so we want to partner with them to be that, to do a preservation group agency you have to
have an architect. There's a whole staffing level that based on, compare us to what City of
Carver has with a lot more Chaska brick homes. That sort of thing. They've got a different level
of need there. So our goal is to identify these. If there are groups that want to preserve and
protect the property, then we want to channel them to work through the county and obviously
we'd give input to that process. Is there anything else you want to add to that Sharmeen?
Papke: I guess I kind of empathize with what Jerry is saying. I mean it, the plan in here is
basically a plan to do nothing other than make a list.
Aanenson: No. Our plan is to go further and work with the County. Be involved at the county
level. To be partners with them. Not to have a separate…
Papke: But at the end of the day it comes down to budget and having a tangible goal for doing
something concrete so, like Jerry mentioned we have, I don't think anybody would question that
the St. Hubert's Church is probably the crown jewels of our historic piece in the city and there's
nothing in here, there's no goal that says you know, like we did with the storm water. With the
surface water management program. We said okay, you've got Lake Minnewashta and Lotus
Lake and these are all things that we think ooh, let's do whatever it takes to preserve or even
improve them and there's nothing in here right now that says we're going to do anything of that
sort. And that's okay but I just think, you know people look at a comp plan and I think that the
average citizen who you know, got up here tonight. You know I've paid my $5,000 in taxes.
You know I want to see something for it. If I was them I'd look at this and go, this is a plan to do
nothing.
Aanenson: Right now we're doing nothing. Right now we're trying to identify those properties
and then…
Papke: …as long as we're all clear that our plan is to do nothing.
Keefe: Isn't the first step identification though? Isn't that doing something?
Papke: Sure. Sure. But listen, this is a comp plan we're going to live with for 10 years. That
could be a pile of rubble.
Keefe: …saying it doesn't go far enough. I mean.
30
165
Planning Commission Meeting - November 6, 2007
Papke: The value system of Chanhassen is very laise faire, okay. We don't have a community
center of, we don't have a city golf course. You know our value system is very much to let the
private sector take care of these things and if we're all in agreement for that, that's fine. That's
what this…but I think what Jerry is reacting to is in other areas where we have it, we've done
more than that and this is, you know this is a plan that really doesn't have much substance to it.
Much concrete action or.
McDonald: I guess one of the things that's missing, and I bring up the church and the fact that
it's deteriorating. At some point it becomes a public hazard. What is that point? Why doesn't
this plan address something such as, what's the criteria for saving something versus not saving
something?
Aanenson: First of all it's private property. It's not the city's. Their contention is that because
it's a historic building, that the city should take ownership. I'm not sure that the city's made that
decision yet. Right now we're just trying to move in that direction to try to put some goals in
place. Put some, work with the county to develop that. This is the first step.
McDonald: Kate, you misunderstand. We're not saying take ownership, but we're saying that if
this comp plan is to address how we do things with zoning and areas such as that, there should be
more here because what are we going to do if the church becomes a hazard to public safety
because it's falling down because the private sector hasn't.
Papke: That's really a good point Jerry, and one of my heartbreaks in the city is the sanitarium.
You know down by the Seminary Fen. The same thing happened and it's now a pile of bricks
and I think the same thing could happen to the church and if the city, if we collectively decide
that's what we want to do, that's fine. That's kind of what you know the comp plan reflects right
now but I think we all should you know, my take away from that is that we're going to do
nothing in the next 10 years other than make a list and hope for the best that others will run with
this.
Undestad: I think part of what you know I mean, making a list is making it known to the private
parties that own these things, we know it's out there. We're watching it.
Papke: Does anybody not know that the church exists?
Undestad: Right, but it's still a private… What I'm saying is, not all the historical houses, all the
old things around town are owned by private individuals and the seminary…
Papke: I'm not saying we shouldn't make the list. That's great. But we shouldn't dilute ourselves
into thinking that this comp plan you know commits the city to do a damn thing beyond making
a list for the next 10 years. Okay? That's all it does.
Aanenson: Chairman McDonald, could I, could I ask Wendy to speak from the Carver County
Historical Society. She's been working with us trying to put this together. Kind of what our
vision is and where we're going.
31
166
Planning Commission Meeting - November 6, 2007
McDonald: I think her input would be very good in all of this.
Wendy Biorn: I can address St. Hubert's a little bit. There is a group forming, Chanhassen
Historical Society. They are forming. The sole purpose, although it's called Chanhassen
Historical Society, their main focus is St. Hubert's. They're in the process. They have their By-
laws and they have their letters of incorporation and they are in the process of forming a non-
profit organization. That's the first step. The problem with St. Hubert's, it's still owned by the
Diocese. As such they are not eligible for a lot of grants that could otherwise come their way.
St. Hubert's, from my understanding in talking with the church is that they would gladly sell it
for a buck as long as it's being taken care of. If they were to do that, there's a couple of different
directions as a City Council you can do because even an organization with some people that are
backing it who are quite well funded, the thing is, they can't do it forever so you'll have to have a
re-use survey or study done of the property to find another usage for the building. Whether it's,
and of course this does not mean gutting it out and making it… What it means is finding it a use
for the property that can possibly help sustain itself, is what it's looking at. Once it becomes a
property that is not church owned, they do become eligible for grants and then they can work in
conjunction with the city. There's a lot of examples of organizations that do that. I come from
one that was very successful up in Rockford in doing that. The City owned the house…historic
house and the Rockford Historical Society was formed to manage it. It is a very good junction.
Under that, you are eligible through the Minnesota Historical Society for some very large grants
that only, when the property is owned by the city and managed by non-profit organizations.
There's not a whole lot of those in the state of Minnesota that are eligible for that type of grant.
So it becomes eligible for money for upkeep and re-use study. The City itself here can help by
having an engineer going and look at a structural, how sound it is. What is it going to take to
keep it up? And a re-use study, which is once they, you or they take the property or if they get
enough donations for it, which is something, the first thing they plan to do is do fundraising once
they become the 5013C, they can pay for the re-use study. Once the re-use study comes, they
can tell you which direction you can go. But you're right, it is a crown jewel of this community
and I would really hate to see it disappear, but the biggest problem is it is still owned by a
diocese.
McDonald: Well see I guess my position is I think the city can bring more pressure to get the
place preserved and they can do that through the ordinance process and inspections and those
things and that's what I think is missing. We have titles that say landmark preservation. What
are we preserving? That's what I think is missing out of this is, if we're going to do this, we
need to say this is what the City's going to do. If you don't take action, we're going to force
something. One way or another, either it gets preserved or we tear it down and that's what I'm
saying, what's the criteria? That's what I think needs to be in here. Not that the city takes
ownership. I'm not saying that. But I'm saying the City has an ownership in this and either the
preservation or the protection of property, and to just sit back and allow it to become rubble is
not an option in my case. Not in this comp plan, so that's what I think is missing. That's my
complaint. It's good to put a list together and identify all this but then what are we going to do
about it?
Wendy Biorn: And I'm hearing that you feel that the city or the council would be willing to
work with the Historical Society. I'm talking either the County or the local organization.
32
167
Planning Commission Meeting - November 6, 2007
McDonald: I'm not saying the city has to create a new department or something. It's just, yes
I'm well aware of what the County does and I'm well aware of the group that's trying to do
something with St. Hubert's and that's great and one of the reasons they're doing it is because
they got so frustrated with nothing happening there and they're watching the building fall down.
So you have citizens that came forward. I'm saying the city has a role to play in that and they
can do it by either forcing that development or getting people to look and make choices instead
of just letting things just sit, you know, and I don't.
Wendy Biorn: Is it possible to get some of this organization and some people from the city
together to work together?
Aanenson: Let's back up. Right now we're just going through the comp plan process. This is
going to be a recommendation going up to the council so you've got it at the county. So we've
got 6 month review. We're certainly going to take your comments and advance those to the
council as is the county will give us their comments on the direction we're going on that too, but
I think all that's kind of where we're going to eventually end up having that discussion and that's
why we're having this.
McDonald: That's what we're trying to give you Kate.
Aanenson: And I appreciate it. You know that's what we want to advance is when we come
back in January, at our meeting with the summation of all the comments, we want to you know,
if we haven't put it correctly, what you want to go, and the county will give us their comments
back too about this because it's up there too to give that, and we want to go right. And ultimately
the council's going to make the recommendation but thank you for your comments. Appreciate
them.
McDonald: Thank you.
Papke: One additional comment on this before we close out. You know I don't want to
minimize how difficult this is. You know I've driven by, was it St. John's in Shakopee that was a
massage parole and hair salon for many years, which has now gone belly up but I appreciate how
difficult it is to make these things economically viable.
Aanenson: Did you know Eden Prairie is trying to unload on some of their projects that they
bought.
Papke: They have problems with the Dunn Brothers situation so.
Aanenson: It's a very complex issue so.
Papke: These are.
Aanenson: I guess what, you know what looks like we're not doing anything for us, we're
moving in really a paradigm shift of not doing anything to getting it on the books and ultimately
33
168
Planning Commission Meeting - November 6, 2007
what's going to go further, we're going to create ordinances. We're going to do things but what
we're saying now is we recognize the importance and where it goes from there is ultimately
council's.
Papke: I agree. It's great that we have something in the comp plan now. The only down side of
having this in the comp plan is the typical citizen expects that oh, there's a historic preservation
section in here now. Now it's going to have some teeth and there isn't a lot of teeth in this right
now. There's not a lot of commitment.
Aanenson: And I think what the other portion that we're missing is ultimately when we see what
the County's got in their ordinance, because we'll be teaming back in with them and I think that's
kind of the piece that's missing and we'll try to pull that together for you when we come back in
January with the final edition.
McDonald: And I guess I'm willing to wait til January but that's what I'm talking about.
Aanenson: No, and I appreciate your comments. They're very good.
McDonald: Then in that case we'll close out on this subject and we'll move to Chapter 4.
Aanenson: Alright. We'll go to housing. Alright if you want to kind of follow along, I jump
kind of back and forth between this presentation and Chapter 4 in the comprehensive plan.
Thankfully the county did a lot of the research for this. They hired Maxfield Research Group
Inc. to, and they did that 10 years ago when we updated the comprehensive plan, to study kind of
the current trends of what's happening in the county. And then selected some of those out,
selected cities to look at, so that relates to Chanhassen. So with that, the first thing that we did
with the council is we adopted the Systems Statement. The Systems Statements come from the
Metropolitan Council and they include population, households and employment. I just showed
the population and households. Although their employment factor does come back to some of
the requirements for density. The systems statements were agreed on by the City Council back
in 2000 and the statements are required by law and are to help communities update their
comprehensive plan. So if you look at the population in 2000, what this takes us out to is the
year 2030, estimated population and I'm going to circle back to that number of 38,000 because it
has implications as it does with households. So if you look at Chan's percent of the county, you
can see we've historically been the largest city in the county as far as population and as you see
as the county tends to mature, because we're the most easterly portion, adjacent to Hennepin
County, you can see that some of the other communities are catching up to us. Household types,
if you look back at this kind of where we are, as most of you are aware, we're a family of, a
community of households of married with children and we have the highest percentage of
children. In the comprehensive plan I didn't include it in this power point but just something I
wanted to note how it ties back. This is actually on page 4.6 where it talks about persons per
household. And it ties into this slide and the fact that in 1990 we were 2.92 persons per
household, which is in the metro area is on the higher end. I think in some of the northern
suburbs there are some that a little over 3. I'm on page 4-, on that table. Okay. And then in
2000 we actually bumped up a little bit again persons per household. When we got the
population numbers this spring from the Met Council, they actually dropped that number,
34
169
Planning Commission Meeting - November 6, 2007
persons per household. After we already redid some of the statements to 2.7 persons per
household. So if we tie that back to what we're expecting for growth, we're actually kind of be
closer to 32,000. And they are using a different model then, census model. They're looking at
vacancy rates. Product type and it's interesting to note when the school district does this, and this
is specifically District 112, they've noted in some of the townhouse projects, the entry level, that
there's actually more than just you know first time homebuyer or senior. It might be a young
family in there. So that has implications that we may not come close to the 38,000. More likely,
if the 2.7 is true, and we did argue that that we think that that's a little low, that we might be
closer to 33,200 as far as ultimate population and that would be in that 2030 year. So I just
wanted to again kind of show you that we still will be a predominantly married with children
kind of community for the next few years. The next table from the census and our building
permit activity, in looking at the type of housing that historically has been owner rental
predominantly, owner occupied. Single family detached is our predominant housing type. If
you look at 1990 and 2000, and I'll show where that ends up when we looked at what the
Maxfield study found out going forward. This is one of the sheets that we have to submit that's
required by the Met Council and it looks like a lot of gobbly goop but I'll just kind of briefly go
through it. What they've required is show us that there's a density requirement they requested all
communities to meet and this also ties back to our Livable Communities Act of density so the
key number here is the 3.43 on the bottom. So what we did is we took, this is all of the
residential zoning districts we have in the city. Large lot…the 9,000. If you move forward to
multi-family, this would be the ultimate number of units based on land use, 2000 and then high
density, another 2,000 approximately so if you're looking at multi-family, it looks closer to half.
When you take the gross acres and then we have to subtract out wetlands, open space, road right-
of-ways to try to get to a net developable acres. Then we take that and we apply net density
formula, and this is a requirement again of the Met Council so this is a sheet that will go forward
to them and it ties back, and I'll show you how that ties back when we move to some of the next
slides. This is some information again that the Maxfield Group found and has some interesting,
to understand some of the market conditions when you look at this slide itself. So if you look at
traditional demand for for sale housing, what they're projecting is additional, in the year, the next
10 years, another 1,660 units and in the 2015 to 2030 another 1,000 or a total of 3,380 new units
for the build out. That would be single family. So what they do is they break that down into
price points and you can see, and this is accurate that we haven't done any single family
households under, detached under $325,000 for a number of years. As a matter of fact when we
get to a future slide you'll see what that, it's pretty shocking what you see for the new price point
for single family detached. So what does that mean? That means there's a pent up demand for
that price point because there's nothing meeting that market, that detached, so that's why you see
an attached product that are coming in under that 325 because we don't have anything in that
price point. So they're still owner occupied but they just tend to be attached as opposed to
detached.
Keefe: So, should I let you finish?
Aanenson: No, go ahead…
Keefe: So in this case, you know when you look at the ratio of single family to multi-family, I
mean they're showing 70% of the.
35
170
Planning Commission Meeting - November 6, 2007
Aanenson: I think those are flip flopped.
Keefe: But the numbers are consistent if you look at.
Aanenson: Yeah. But ultimate build out, if you take what we have to date, it's so far heavily
weighed, we'll always be 40, 70%.
Keefe: Yeah, I just found that.
Aanenson: Yeah. Well I think when they mean multi-family, I think they mean attached
product. It'd still be owner occupied. I'll come back to that too. There's a couple of points on
that when we talk about price points and the like. So this would be the ultimate demand for
rental, which is about, in the next build out, 2030 would be over 1,055 units. Of that, they break
that down into market rate, which is about half would be about 530. Then they break it down
into how much senior we would need, 425 and then the affordable, 175. Now looking at that
we've had requests to do a significant amount of senior housing. Well in excess of 1,000 units.
We've had some parties interested in providing that, which is well beyond what we believe meets
our needs, and that would be products that would be maybe moving from independent to assisted
living. So again looking at some of our demographics we believe that that may be in excess of
what we want to provide to meet some of our residents, and we've also, you know with the senior
center in this building, congregate dining, we've identified some sites that are closer to this area
that would be appropriate for senior housing. Any questions on that part of it? So this also had
some revealing information on what's happening out in our marketplace. If you look at average
re-sale price. So this would be an average single family. Now this is just retail price so I just
compared ourselves to kind of our sister cities in the county. If you look at our average resale
price, we're at 441. So this would be existing stock with new stock so that's kind of what's out
there in the market. Again, except for Victoria, we're one of the higher ones in the county. Then
this is the multi-family resale price. Again if you look at historically, and this is in detail in the
document, housing chapter 2, that Chanhassen is, has a more modest, if you look at what
Victoria has, 359. Probably more of their multi-family attached is not in the same era or the
same number that we have over time, so if you look at, this is what I'm tying back. This doesn't
say multi-family doesn't say rental or owner, you know it's what it's saying is they're an attached
product, and that's fitting that gap that we don't have anything under that 325. That's when you
can see where we hit that pent up demand to see that projects. And just so you know too, in this
marketplace, if you look at where we have the biggest jump in building permit activities, when
there's that price point in the market because they're kind of be waves of some of that built up,
pent up demand. This sheet right here, I'm not going to try to go through all this. What I just
want to show you is that there is a platting requirement, a platting, what's the word I'm looking
for? A platting process that the Met Council likes us to see that we go through, and actually Bob
Generous on our staff created this a long, long time ago and actually this is the same process that
the Met Council uses. So what we do is we track every project that comes in and we come up
with, this is for single family. What we come up for a net density, so that's the 1.3. If you take
that same process, which we do for all multi-family projects, so we've been tracking these. We
just took those from 1998, and this was the first one we did multi-family. To track for the Met
Council where are we at with density, so this is our overall and this ties back to that, when I
36
171
Planning Commission Meeting - November 6, 2007
showed you that formula we have to submit for the Met Council, the 3.4. This ties back that
we're in excess of that 4.83. And this does ebb and flow depending on what products come into
the marketplace and how much single family we're doing. How much multi-family and we kind
of move forward, away from it so it's kind of long term plat monitoring. That's the word I was
looking for. Plat monitoring process. So this is also a submittal requirement that we have to do
for the Met Council. I want to talk about Livable Communities for a little bit. But before I do
that I want to talk a little bit about some of the findings that, this is on page 4.8 of the housing
report. Kind of where we are in the county. Where our population is. You notice we're tending
to age. The largest segment of the population, 38% is between 35 or 54 and the medium age of
the population is 35.5. So they're anticipating that we're going to see more you know, as people
get older, different life style housing choices which we've always talked about too. We've
looked at some products. You know are they, do they have a lot of stairs? As you notice on the
K. Hovnanian project that they actually moved to a condo product and they recognize that they
were having some of those issues, so those were some of the things that we tried to, as we're
meeting with people, to look at those. We will still have a lot of young families, as found in,
recommended in the study and found in the study, and then because we have the transit
component here, the largest portion of jobs, which is also pointed out in the study, that there is
some demand for some of the rental housing and different housing product types as we have
some of those service needs, and that's one of the factors I'll go to in a minute. But I think that if
we look at, even when we did Powers Ridge, that has now become condos. That was started as
apartments so right now that market's a little soft but we anticipate we'll certainly see more
markets, more demand for apartments coming into the market.
McDonald: Wait, Powers Ridge. Is that the new development that's off of the 101?
Aanenson: Nope. That's the one over by Lake Susan. It started off as apartments and it's gone
all condo.
McDonald: It's gone all condo.
Aanenson: And actually those are, if you look at the price points, which I'll go through those in a
minute, so those would meet some affordable goals. So the Livable Communities Act, what
we're recommending is we stay with this. This was our original recommendation for the Livable
Communities Act, and we haven't changed from this. This was our original adoption in 1996.
We haven't moved from that recommendation. We're still recommending that. You can see we
tied that, when we did that in 1996 we estimated that we could meet the 3.3 goal. That's why we
set up the plat monitoring back then so we could track that we're beneath that and again we kind
of move towards it and away from it depending on the projects that are done that year, but that's
our goal. And I just want to take a few minutes, because I'm not sure all of you are familiar with
the Livable Communities Act and how that works. The Livable Communities Act came out of
1995 landmark discrimination case on the Homeland Consent Decree which was a severe
scarcity of affordable housing in, what they considered the region's poor people and they made,
they did demolition of 770 subsidized units and said they need to go further out of Minneapolis
and move out into the outer rings and each community needed to accept from that so in 1996
they created a bill called the Livable Communities Act and communities were requested to
apply. The goal was to stimulate housing and economic community development in the 7 county
37
172
Planning Commission Meeting - November 6, 2007
area. So the Metropolitan Council does offer money and gives development. We have used
some of the Livable Communities Act. We did use it on the Villages on the Pond. That was
one. We were the first city to go through under that criteria and we did receive funding for that
project itself. So participation is voluntary. We don't have to participate. And then the Met
Council gives us a report every year, a score card on how we're doing on that. As you can
imagine we've moved away from that a little bit. We'll show up next year because we did take
down Lakeview Hills but we did do the project on Lake Susan which is the Sands Company.
Al-Jaff: Gateway.
Aanenson: Gateway Park, thank you. As subsidized, and I'll talk about that in a minute too.
Keefe: What are the benefits though?
Aanenson: I'm going to go through that.
Keefe: Yeah, okay.
Aanenson: So first I'm going to explain what these definitions are, because there's really three
components. One is affordability. So you have a mix of owner/rental. That's one of the things
they say you should look at affordability's one component. Life cycle which means that you
have different types of housing. And the other component is the owner rental mix. So I'll define
those here. So life cycle means that there must be enough variety in your housing stock to
support the physical needs and fit the financial resources of people through their life. So what
does that mean? We've got senior housing. We've got starter housing. We've got move up,
entry level. We have those different types of opportunities, and that's always been in the goals of
the city. As a matter of fact the goals that are in the comp plan, really as I revisit them are pretty
try today as we approved probably pretty much in whole back in 1991 but they certainly were in
place in last. Affordability is based on the census bureau and federal housing subsidy standards
requiring residents to pay up to 30% of their household income on housing. So let me just for
example give you, on the Gateway project. So because there was some concern for the
neighbors that they were all subsidized. They're not. These are working people. So to get into
one of those, if you were to get into a one bedroom, you need an income of $36,000. To get into
a two bedroom, you need a combined household income of $76,000. And then if you get into a
three bedroom, you need a combined income of approximately $50,000. So these are working
people that get in there, so they're income qualified. So when we look at that number, you know
those are, when we talk about people and we're opening up a new high school. How do we
provide opportunities for those type of people to get into and that's where that entry level, when
we look at that 325, owner occupied for people that want to get that price point that allows them.
This is on the renter mix so there's two components to affordability. You know it's, well we have
a lot. We don't really provide subsidy for owner occupied. We've been able to accomplish that
through our product itself. For example Pulte Home came in with products that met that. The
Liberty on Bluff Creek has some products. Now that the apartments that I just mentioned went
condo on Powers Ridge, those also meet the affordability, so that we don't have the problem
with. The problem we have with the affordability, and it's not just Chanhassen. This is regional
is when you do rental. It's almost impossible without some assistance. So for example on the
38
173
Planning Commission Meeting - November 6, 2007
Gateway project there was a housing district created. Presbyterian Homes, we did provide
assistance. There was a housing district created. So in order for us to accomplish those goals, so
it's difficult because a lot of communities are chasing those same dollars because you compete
before the Met Council. So we did get affordable housing from the Met Council for the Gateway
and we've continued to do that, but it's hard to make up that gap without assistance. City
assistance on a couple different fronts. So the owner rental mix is pretty self explanatory. That's
looking at what our, what we believe is how much, or how much is going to be rental, and again
that hasn't changed. So we're kind of looking at a ratio of 80/20, 90/10 and that's where we're
going to end up as you take stock of the overall development of the city. So the benchmark came
into places, they went and they set a city index. What you were at the date, the snapshot when
they did this in 1995. How much did you have? Well one of the points that we made is we're
going to move from that, for example we just talked about Lakeview Hills. There's some, we
have, one of the things which we discussed in the housing element is that we created rental
licensing property. What it allows us for the upkeep as we talk about maintenance of those older
structures, of apartments that we have kind of in the core of downtown. Some of them on 101
that are older apartments that we want to maintain that as viable places to live and requires
property owners to keep those in good shape because those also provide affordable rents, and
those are at market rate just because of the years that they were built. And that information is
also available. We keep that information available for residents that are interested in looking for
apartments but again having the rental license helps us maintain those properties long term to
provide viable opportunities. Any questions that you have on the Livable Communities? I can
go into a lot more of why we would or wouldn't do it or.
Keefe: Yeah. It isn't clear to what the benefits are.
Aanenson: Well you can get assistance.
Keefe: Even when we get some dollars, we get a few dollars. A couple hundred thousand
dollars for Gateway and we get a little bit for the other project. And it's that, is that it? I mean
what are the other…
Aanenson: Well any other grants that you apply that the Met Council is the pass through, such
as state highway, those sort of things, they score you on, they grade you on whether or not you're
participating in the Livable Communities Act. And that would include Southwest Transit. It
would affect them too.
Keefe: Okay.
Aanenson: So. This aside, we're following our plan. You know the rub we're going to have is
the rental. It's hard to meet that goal, but we're not the only ones in that situation, but this aside,
we're following our plan and we're meeting those goals. And again the market picks up those
places. Like I said you can see where there's gaps in some of those price points. That someone
comes in and says I can see that there's a demand for some of that so. I'm not sure that it
influences us to the fact that some people think it does. I think there's always an obligation that
we try to find opportunities for, and it's also mentioned in too, if you look at where the growth of
job opportunities, they're still going to be in this part of the county, because we have the transit.
39
174
Planning Commission Meeting - November 6, 2007
That that's where the, the high school, some of these other new jobs that we're looking at coming
in the mall, that that would be an opportunity to provide some additional affordable. And I want
to call it affordable. Not, people use the word subsidized or that sort of thing but they're
affordable for maybe entry level working people. So if you look in the comp plan too, we did
identify how we would achieve some of those goals and that's what we've used in the past. To
get the affordability. If you want me to go through those, I can do that but I think those are
pretty self explanatory. So today's date, just to give you the affordable in today's dollars because
I didn't touch on that. If you look at 80% of the median, so that's any home priced over $201,000
so you can see right now we're not building anything, single family detached on this so that's
why you really, in order to get that, for single family home, or for a two bedroom, the 933. This
is just a summary of what came out of the Maxfield regarding Chanhassen, comparing it to the
county. Kind of looking at the population. Again they're looking at that number 32 and again
when we accepted the system statements, if you go back, they looked at that population number
at 38 and I believe that we'll probably be closer to 33. If that 2.7 is a more accurate number. So
you look at the household growth. Again for your, the median household price, and that's in
there, I don't know if you caught what our average price for new homes were. It's you know
$999,000. That's a new home price. Pretty shocking. But if you also look at what we did for
single family detached, why that number is slowing down is, that's a narrow market. We do
have, when we introduce other price points or other product types that are going, and I just want
to go back to the Livable Communities Act, we talk about density. One of the projects that we
just saw here earlier tonight, Lakeside, there's different ways when we think about density and
application. That was the first project that we've done that we actually did luxury condominiums
and again we're always trying to challenge ourselves to say what product are we missing in the
community and that wasn't one we had yet. It took an opportunity to avail itself of some golf
course views and lake views, and even those, while those are attached product in there, those are
on the higher end of the attached product and I think if you would compare us to Victoria, that's
definitely the higher end, so we're really trying to make that blend of, so density doesn't always
mean a price point. If you think about that in the future, if we start looking ultimately for
example on the golf course property which we'll be talking about at the next meeting. Thinking
about what are the opportunities there for product and preserving. Think about those so I don't
want to confuse density always mean it has to be a rental or has to be a lesser quality or certain
price point. So there you can see our numbers for Chanhassen, for average resale price and
multi-family. Single family again and there's new construction, 935. Average number, and
again you look at that 85 because that's why you're in that price point of that kind of traditional.
Now this doesn't take into play that this snapshot done, what's kind of been happening this last
year and some of our other projects that we did, the smaller lots and those are doing really well
too but those are closer to the $500,000 price.
Keefe: You know the question, you know when the prices rise like they're saying, I assume the
prices are rising because there's the demand for it in this community. So in terms of sort of
living within the Livable Communities Act, I mean are we sort of going against what the demand
is for the city versus what might be for the region? You know.
Aanenson: No. I think you know the goal that we've had, and we've met that is, to provide that
diversity of lifestyle for all choices, and I think that's the challenges and my concern is that we
do a lot of two story houses and as you look at the demographics that we're aging, not
40
175
Planning Commission Meeting - November 6, 2007
everybody's going to want in 20 years buy that two story house so we try to look at products, and
we've had that discussion of more the one level. It's certainly more cost effective and you've got,
you pay the $200,000, if you look at our lot prices which is up in that study too, average lot price
of $230,000 that people want to maximize that investment and go two stories but, and you know
that's why we're challenging ourselves to look at other types of projects so we maybe can do a
single family, for example if you look at what we've done in the Preserve which is doing well,
some of those are single stories which is a lifestyle choice and I think we just have to make sure
that we have that diversity. If you have all of one thing, then some people may have a harder
time selling when you're all competing with 200 homes with the same type. So I think that's one
of our strengths is that we do have a great diversity that meets all our needs. And it's interesting,
we've had people tell us, I never want this and I have people that come in in different
situations…that say I want to stay in the community. Thank goodness I've got another option to
make that happen or their parents need to move here and so, you know we do want to be
community wide and that has been our goal for a number of years so, it's kind of that challenge
too. Look at those opportunities, and we'll talk about that when, we're recommending a few land
use changes but for the most part we're not changing land use. Those have been in place so we're
meeting those same goals. Anything else interesting to note on here. Kind of what we're looking
at again for assisted living and those, we've identified some properties for that too. But I think
you know when you look at us compared to the county, it's pretty amazing…the marketplace.
This is just a summary of what we've done for market rate, just to give you an idea of the
projects that are up on market rate. Now since this was put out, Powers Ridge as I mentioned
has now gone condo so that will have to be adjusted. And then the last thing I wanted to talk
about was that the Met Council comes out with this study that says, this is our responsibility
based on job proximity because not only are we in eastern Carver, over 8,000 jobs within our
community. We're close to Hennepin County which also has a huge employment base. So they
take that. They look at our existing housing stock and our transit level and come up with a
number that they recommend that we need to provide for affordable housing. And that's 1,300.
If you back that out over 30 years and look at the housing demand.
Larson: Where do they come up with that number?
Aanenson: Well.
Larson: I mean really.
Aanenson: Well, it's going to be a difficult number to reach and the fact being is that if you back
that out, it's about 117 affordable units a year. We're not going to make that. We haven't made
that and we know that's going to be a problem, especially when we get into the rental area,
because I think if you look at it for the owner occupied, we have a better shot of making that.
They did adjust that number, which they do every year. This was a 2006 number. They did
adjust it for 2000 and knocked a few off, but if you can see where they're going with that
number. Even Chaska has to provide another 746.
Larson: …the transit.
Aanenson: Well Chaska's also part of the transit component too.
41
176
Planning Commission Meeting - November 6, 2007
Larson: I know but you know.
Aanenson: If you look at where we've done for example where we put Gateway. We put that
across from the transit, those are the kind of opportunities. There's another opportunity that we
see in the core of downtown, as we've talked about that and we'll revisit that on the land use
when we talk about land use. Some of the redevelopment properties that we want to keep some
of that density in the core of downtown. That can also participate in some of the subsidy that we
already provide here, and then also, and we look at the potential for regional mall. That's another
opportunity that they've talked about doing some rental there where you've got transit component
and also access to conveniences, which we certainly don't want to, and I think that's the struggle
that some of the other states, the county has, there's not access to some of those communities
don't even have pharmacies. Some of those sort of things which is a struggle when you're trying
to do senior housing and the like, that there's no access to some of those things. Good news, bad
news for us that we've done a good job of planning for some of those. Also it just so happens
that we're kind of on that growth wave, so I don't want everybody to think that we're you know,
we're staying the course and you'll see that when we did a land use recommendation as far as, as
they march along with density, we do have some large single family potential. We talked about
the Bluff Creek. We also have some large multi-family. We talked about the Moon Valley site,
which some of you walked, that we provided for that, but for the most part kind of the biggest
chunks are underway. The next one that would be coming in would be the Erhart piece and that
we'll talk about next week too. I know this is a lot to digest so what I'd like if you have some
comments, otherwise if you wanted to get back to me on…or go back to any of the slides, I'd be
happy to do that. Comments?
Papke: It's a lot of data but, yeah.
Aanenson: A lot of data.
Papke: The comp plan itself, the real meat at the end of the day the real meat is section 4.7. It's
okay. A lot of data and then there's one page of here's what we're going to do. It's not really
very binding or anything. I mean it's just, these are all kind of our New Year's resolutions of
what we're going to try to do for the next 10 years.
Aanenson: Right. The binding part is it ties back into the land use and when I give you that
matrix, and we're not substantially changing from the proportionality. Now what we've done,
and you'll see that in the land use section, is we've taken out some of those areas that are non-
developable. For example you know we showed you in that little 50 some zoning changes that
the Met Council tracks vacant land. So what we want to make sure is on some of those land use
recommendations, if it's not buildable, we want to take it out of the mix because that throws off
our projections of what their expectations are for density so that's part of it. The biggest part of
the clean-up. But really we're not making a major shift. Our goals have been in place for life
cycle housing. We're not making a big paradigm shift. We have found a couple other properties
that we want to maybe shift up that make some sense for either affordable housing or senior
housing. We're sure look with you too but.
42
177
Planning Commission Meeting - November 6, 2007
43
Papke: Just one other comment I have, back to the historical preservation again. Had a thought
here. Every year we do a little road trip, a little tour. On my tenure on the commission we've
never looked at historic sites.
Aanenson: Great idea.
Papke: You know we should, the next time we go we should walk through the church. Walk
through the Strawberry Hill. We've seen Strawberry Hill here a couple times but I've never been
in that place. It'd be great to see them.
Aanenson: That's a great idea. We do have a work session, if you look, the 2008 schedule is up.
We do have a work session scheduled so that's a great idea.
Al-Jaff: One of the things that we're trying to work on with the county is actually doing some
tour buses throughout the community and show the different community every month throughout
Carver County.
Papke: There's a lot of stuff in Carver too. And Chaska.
Aanenson: Yep. Well I think that was a great idea. We'll put a list together and you guys can
add to it.
APPROVAL OF MINUTES: Commissioner Dillon noted the verbatim and summary minutes
of the Planning Commission meeting dated October 16, 2007 as presented.
COMMISSION PRESENTATIONS: None.
Chairman McDonald adjourned the meeting at 9:25 p.m.
Submitted by Kate Aanenson
Community Development Director
Prepared by Nann Opheim
178
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952227 1110
Building Inspections
Phone 952227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952227 1130
Fax 952227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
1
MEMORANDUM
TO Todd Gerhardt City Manager
FROM 7PaulOehmeDirectorofPublicWorksCityEngineer
DATE November 26 2007
SUBJ Approve Master Contract for Consulting Services with Barr
Engineering Company PW009B
DISCUSSION
Staff is recommending approval of the master contract agreement for consulting
services with Barr Engineering Company Since Barr Engineering Company is
working on the proposed Wells 12 13 project it is advisable to have a master
service agreement with this firm This agreement is standard for professional
service firms who work for the City regularly The agreement in general covers
insurance indemnification fees and other basic service requirements
The city attorney has drafted and reviewed the agreement
Attachment
The City of Chanhassen A growinrgc lfJMta HMI l CjllflijM cil ehplBi@ PY l6tQ yffig a W winding trails and beautiful parks A great place to live work and play179
AGREEMENT
FOR
PROFESSIONAL ENGINEERING SERVICES
ORIGINAL
THIS IS AN AGREEMENT made between the CITY OF
CHANHASSEN a municipal corporation in the Counties of Carver and Hennepin State
of Minnesota hereinafter called the OWNER and BARR ENGINEERING
COMPANY hereinafter called the ENGINEER The date of this agreement is
October 29 2007 OWNER intends to secure professional ENGINEERING services
subject to and according to the terms of this Agreement
OWNER intends to secure professional consulting engineering architectural
and or land survey services on an ongoing basis for multiple projects subject to and
according to the terms of this agreement OWNER shall issue a project specific
supplemental agreement or work order for each project which may by mutual agreement
between OWNER and ENGINEER alter the terms of this agreement for a specific
project
SECTION 1 BASIC SERVICES OF ENGINEER
1 1 GENERAL
1 1 1 ENGINEER shall provide for OWNER professional engineering services in
all phases of the Project to which this Agreement applies as hereinafter provided These
services will include serving as OWNER S professional engineering representative for
the Project providing engineering consultation and advice and furnishing customary
general municipal engineering land surveying wetlands and drainage and traffic and
transportation engineering and other customary engineering services and architectural
services thereto ENGINEER is an independent provider of professional engineering
and or land surveying services responsible for means and methods used in performing
ENGINEER S services pursuant to this Agreement
12 STUDY AND REPORT PHASE
After written authorization to proceed ENGINEER shall if requested by OWNER in
supplemental agreement
12 1 Consult with OWNER to clarify and define OWNER S requirements for the
Project review available data and attend necessary meetings and be available for general
consultation A Service Planner will be prepared for each project to clarify roles and
responsibilities of the OWNER and the ENGINEER
134745v02
RNK r 1 019 2007
1
180
1 2 2 Advise OWNER as to the necessity of OWNER S providing or obtaining
from others data or services of the types described in paragraph 3 3 and assist OWNER
in obtaining such data and services
1 2 3 Identify and analyze requirements of governmental authorities having
jurisdiction to approve the design of the Project and participate in consultations with such
authorities
1 24 Provide analyses of OWNER S needs planning surveys site evaluations
and comparative studies of prospective sites and solutions
12 5 Provide a general economic analysis of OWNER S requirements applicable
to various alternatives
12 6 The ENGINEER shall conduct and prepare preliminary studies layouts
sketches preliminary field work preliminary cost estimates estimates of assessment
rates and shall assist the OWNER in obtaining required subsurface investigations as
required for the preparation of the Feasibility Reports The Feasibility Reports shall
conform to the format presented in Appendix A of this Agreement The report shall
contain schematic layouts sketches and conceptual design criteria with appropriate
exhibits to indicate clearly the considerations involved including applicable
requirements of governmental authorities having jurisdiction as aforesaid and the
alternative solutions available to OWNER and setting forth ENGINEER S findings and
recommendations This Report will be accompanied by ENGINEER S opinion of
probable costs for the Project including the following which will be separately itemized
construction cost and indirect cost consisting of engineering costs and contingencies and
on the basis of information furnished by OWNER allowances for such other items as
charges of all other professionals and consultants for the cost of land and rights of way
for compensation for or damages to properties for interest and financing charges and for
other services to be provided by others for OWNER pursuant to paragraphs 3 7 through
3 11 inclusive The total of all construction and indirect costs are hereinafter called
Total Proj ect Costs
1 2 7 Furnish fifteen 15 copies of the Study and Report documents and review
them in person with OWNER unless otherwise specified in the Supplemental Letter
Agreement for the proj ect
1 2 8 The ENGINEER shall assist with presenting the Feasibility Reports to the
proper reviewing agencies and to the City Council The ENGINEER shall appear at the
public hearing to present the information
13 PRELIMINARY DESIGN PHASE
134745v02
RNK r1 019 2007
2
181
After written authorization to proceed with the Preliminary Design Phase ENGINEER
shall if requested by OWNER in supplemental agreement
1 3 1 In consultation with OWNER and on the basis of the accepted Study and
Report documents determine the general scope extent and character of the Project
attend necessary meetings and be available for general consultation
1 3 2 Prepare Preliminary Design documents consisting of final design criteria
preliminary drawings outline specifications and written descriptions of the Project
1 3 3 Advise OWNER if additional data or services of the types described in
paragraph 34 are necessary and assist OWNER in obtaining such data and services
1 34 Based on the information contained in the Preliminary Design documents
submit a revised opinion of probable Total Project Costs
1 3 5 Furnish preliminary legal descriptions and exhibits for all permanent and
temporary easements anticipated to construct the Project
1 3 6 Furnish three 3 copies of the above Preliminary Report documents and
present and review them in person with OWNER
14 FINAL DESIGN PHASE
After authorization to proceed with the Pinal Design Phase ENGINEER shall if
requested by OWNER in supplemental agreement
14 1 On the basis of the accepted Preliminary Report documents and the revised
opinion of probable Total Project Costs prepare for incorporation in the Bidding
Documents final drawings to show the general scope extent and character of the work to
be furnished and performed by Contractor s hereinafter called Plans and
Specifications
14 2 Provide technical criteria written descriptions and design data for use in
filing applications for permits with or obtaining approvals of such governmental
authorities as have jurisdiction to approve the design of the Project and assist OWNER
in consultations with appropriate authorities The ENGINEER shall submit all
applications and easement descriptions to the appropriate agencies and submit copies to
the OWNER
14 3 Provide legal descriptions and exhibits for all easements property surveys
or related engineering services needed for the transfer of interests in real property and
134745v02
RNK rl019 2007
3
182
field surveys for design purposes and engmeenng surveys and staking to enable
Contractor s to proceed with their work
14 4 Advise OWNER of any adjustments to the latest opinion of probable Total
Project Costs caused by changes in general scope extent or character or design
requirements of the Project or Construction Costs Furnish to OWNER a revised opinion
of probable Total Project Costs based on the Plans and Specifications
14 5 Prepare for review and approval by OWNER its legal counsel and other
advisors contract agreement forms general conditions and supplementary conditions and
where appropriate bid forms invitations to bid and instructions to bidders and assist in
the preparation of other related documents
14 6 Attend necessary meetings and be available for general consultation
14 7 Furnish three 3 copies of the above documents and of the Plans and
Specifications and present and review them in person with OWNER
1 4 8 The ENGINEER shall furnish one copy of all design calculations as
requested by OWNER
1 5 BIDDING OR NEGOTIATING PHASE
1 5 1 The ENGINEER shall prepare and forward the Advertisement for Bids to
the designated publications official newspaper and the OWNER The ENGINEER shall
supply up to thirty 30 sets of full size final Plans and Specifications for use in obtaining
bids and submitting for general review unless otherwise specified in the Supplemental
Letter Agreement for the project The ENGINEER shall maintain a record of prospective
bidders to whom Bidding Documents have been issued attend pre bid meetings and
receive and process deposits for Bidding Documents
1 5 2 Issue addenda as appropriate to interpret clarify or expand the Bidding
Documents
1 5 3 Consult with and advise OWNER as to the acceptability of subcontractors
suppliers and other persons and organizations proposed by the prime contractor s
herein called Contractor s for the portions of the work where acceptability is
required by the Bidding Documents
1 54 Consult with and advise OWNER concerning and determining the
acceptability of substitute materials and equipment proposed by Contractor s when
substitution prior to the award of contracts is allowed by the Bidding Documents
134745v02
RNK rlO19 2007
4
183
1 5 5 Attend the bid opening prepare bid tabulation sheets and assist OWNER in
evaluating bids or proposals and in assembling and awarding contracts for construction
materials equipment and services
16 CONSTRUCTION PHASE
During the Construction Phase
1 6 1 General Administration of Construction Contract ENGINEER shall
consult with and advise OWNER and act as OWNER S representative All of OWNER S
instructions to Contractor s will be issued through ENGINEER who will have authority
to act on behalf of Owner to the extent provided in the General Conditions except as
otherwise provided in writing The General Conditions shall not be modified without the
written agreement of the OWNER
1 6 2 Visits to Site and Observation of Construction In connection with
observations ofthe work ofContractor s while it is in progress
1 62 1
1 6 2 2
1 6 23
134745v02
RNK rl019 2007
ENGINEER shall make visits to the site at intervals appropriate to
the various stages of construction as ENGINEER and OWNER
deems necessary in order to observe as an experienced and qualified
design professional the progress and quality of the various aspects of
Contractor s work In addition if requested by OWNER
ENGINEER shall provide the services of a Resident Project
Representative and assistants as agreed at the site to assist
ENGINEER and to provide more continuous observation of such
work Based on information obtained during such visits and on such
observations ENGINEER shall endeavor to determine in general if
the work is proceeding in accordance with the Contract Documents
and ENGINEER shall keep OWNER informed of the progress of the
work
The Resident Project Representative and any assistants will be
ENGINEER S agent or employee and under ENGINEER S
supervision The duties and responsibilities of the Resident Project
Representative and assistants are set forth in Appendix B Duties
Responsibilities and Limitations of Authority of the Project
Representative
The purpose of the ENGINEER S visits to and representation by the
Resident Project Representative and assistants if any at the site
will be to enable ENGINEER to better carry out the duties and
responsibilities assigned to and undertaken by ENGINEER during
5
184
the Construction Phase and in addition by exercise of
ENGINEER S efforts as an experienced and qualified design
professional to provide for OWNER a greater degree of confidence
that the completed work of Contractor s will conform to the
Contract Documents and that the integrity of the design concept as
reflected in the Contract Documents has been implemented and
preserved by Contractor s On the other hand ENGINEER shall
not during such visits or as a result of such observations of
Contractor s work in progress supervise direct or have control
over Contractor s work nor shall ENGINEER have control or
charge of and shall not be responsible for the Contractor s means
methods techniques sequences or procedures of construction
selected by Contractor s for safety precautions and programs
incident to the work of Contractor s or for any failure of
Contractor s to comply with laws rules regulations ordinances
codes or orders applicable to Contractor s furnishing and
performing their work Accordingly ENGINEER can neither
guarantee the performance of the construction contracts by
Contractor s nor assume responsibility for Contractor s failure to
furnish and perform their work in accordance with the Contract
Documents
1 62 4 If ENGINEER observes or otherwise becomes aware of defects or
deficiencies in the work or nonconformance to the Contract
Documents ENGINEER shall promptly give written notice thereof
to OWNER
1 6 3 Defective Work During such visits and on the basis of such observation
ENGINEER may disapprove of or reject Contractor s work while it is in progress if
ENGINEER believes that such work will not produce a completed Project that conforms
generally to the Contract Documents or that it will prejudice the integrity of the design
concept of the Project as reflected in the Contract Documents
1 64 Interpretations and Clarifications ENGINEER shall issue necessary
interpretations and clarifications of the Contract Documents and in connection therewith
prepare work directive changes and change orders as required for OWNER S approval
1 6 5 Shop Drawings ENGINEER shall review and approve or take other
appropriate action in respect of Shop Drawings samples and other data which
Contractor s are required to submit but only for conformance with the design concept of
the Project and compliance with the information given in the Contract Documents Such
reviews and approvals or other action shall not extend to means methods techniques
134745v02
RNK r 1019 2007
6
185
sequences or procedures of construction or to safety precautions and programs incident
thereto
1 6 6 Substitutes ENGINEER shall evaluate and determine the acceptability of
substitute materials and equipment proposed by Contractor s but subject to the
provision of paragraph 2 22
16 7 Inspections and Tests ENGINEER shall have authority as OWNER S
representative to require special inspection or testing of the work and shall receive and
review all certificates of inspections testings and approvals required by laws rules
regulations ordinances codes orders or the Contract Documents but only to determine
generally that their content complies with the requirements of and the results certified
indicate compliance with the Contract Documents ENGINEER shall be entitled to rely
on the results of such tests
1 6 8 ENGINEER shall respond to all written claims submitted by Contractor in
a timely fashion ENGINEER shall not be liable for the results of any such interpretations
or decisions rendered in good faith
1 6 9 Applications for Payment Based on ENGINEER S on site observations as
an experienced and qualified design professional on information provided by the
Resident Project Representative and on review of applications for payment and the
accompanying data and schedules
1 6 9 1
1 6 9 2
134745v02
RNK rl019 2007
ENGINEER shall determine the amounts owing to Contractor s and
recommend in writing payments to Contractor s in such amounts
Such recommendations of payment will constitute a representation
to OWNER based on such observations and review that the work
has progressed to the point indicated and that to the best of
ENGINEER S knowledge information and belief the quality of
such work is generally in accordance with the Contract Documents
subject to an evaluation of such work as a functioning whole prior
to or upon Substantial Completion to the results of any subsequent
tests called for in the Contract Documents and to any other
qualifications stated in the recommendation In the case of unit
price work ENGINEER S recommendations of payment will include
final determinations of quantities and classifications of such work
subject to any subsequent adjustments allowed by the Contract
Documents
By recommending any payment ENGINEER will not thereby be
deemed to have represented that exhaustive continuous or detailed
reviews or examinations have been made by ENGINEER to check
7
186
the quality or quantity of Contractor s work as it is furnished and
performed beyond the responsibilities specifically assigned to
ENGINEER in this Agreement and the Contract Documents
ENGINEER S review of Contractor s work for the purposes of
recommending payment will not impose on ENGINEER
responsibility to supervise direct or control such work or for the
means methods techniques sequences or procedures of
construction or safety precautions or programs incident thereto or
Contractor s compliance with laws rules regulations ordinances
codes or orders applicable to their furnishing and performing the
work It will also not impose on ENGINEER responsibility to make
any examination to ascertain how or for what purposes any
Contractor has used the money paid on account of the Contract
Price or to determine that title to any of the work materials or
equipment has passed to OWNER free and clear of any lien claims
security interests or encumbrances or that there may not be other
matters at issue between OWNER and Contractor that might affect
the amount that should be paid
16 10 Contractor s Completion Documents ENGINEER shall receive and
review maintenance and operating instructions schedules guarantees bonds and
certificates of insurance tests and approvals which are to be assembled by Contractor s
in accordance with the Contract Documents but such review will only be to determine
that their content complies with the requirements of and in the case of certificates on
inspection tests and approvals the results certified indicate compliance with the Contract
Documents and shall transmit them to OWNER with written comments
1 6 11 Inspections ENGINEER shall conduct an inspection to determine if the
work is substantially complete and a final inspection to determine if the completed work
is acceptable so that ENGINEER may recommend in writing final payment to
Contractor s and any give written notice to OWNER and the Contractor s that the work
is acceptable subject to any conditions therein expressed but any such recommendation
and notice will be subject to the limitations expressed in paragraph 1 6 9 2
16 12 Limitation of Responsibilities ENGINEER shall not be responsible for the
acts or omissions of any Contractor or of any subcontractor or supplier or any of the
Contractor s or subcontractors or suppliers agents or employees of any other persons
except ENGINEER S own employees and agents at the site or otherwise furnishing or
performing any of the Contractor s work however nothing contained in paragraphs
1 6 1 through 1 6 11 inclusive shall be construed to release ENGINEER from liability for
failure to properly perform duties and responsibilities assumed by ENGINEER in the
Contract Documents
134745v02
RNK rl019 2007
8
187
1 7 OPERATIONAL PHASE
During Operational Phase ENGINEER shall when requested by OWNER
1 7 1 Provide assistance in the closing of any financial or related transaction for
the Proj ect
1 7 2 Provide assistance in connection with the refining and adjusting of any
equipment or system
1 7 3 Assist OWNER in training OWNER S staff to operate and maintain the
Project Extensive training shall be mutually agreed upon within the Supplemental
Agreement as Additional Services as defined in Section 2 of this agreement
1 74 Assist OWNER in developing systems and procedures for control of the
operation and maintenance of and record keeping for the Project
1 7 5 Within ninety 90 days after completion of a Project prepare a set of
reproducible record prints of Drawings showing those changes made during the
construction process based on the marked up prints drawings and other data furnished
by Contractor s to ENGINEER and which ENGINEER considered significant
ENGINEER will not be responsible for any errors or omissions in the information
provided by Contractor that is incorporated in the record drawings and record documents
Final payment will be made only after record drawings are received by the OWNER
17 6 In company with OWNER visit the Project to observe any apparent defects
in the completed construction assist OWNER in consultations and discussions with
Contractor s concerning correction of such deficiencies and make recommendations as
to replacement or correction of defective work
17 7 Assist OWNER in preparation of assessment roll for City improvement
projects and attend assessment hearings
SECTION 2 ADDITIONAL SERVICES OF ENGINEER
2 1 SERVICES REQUIRING AUTHORIZATION IN ADVANCE
If authorized in writing by OWNER ENGINEER shall furnish or obtain from others
Additional Services of the types listed in paragraphs 2 1 1 through 2 1 14 inclusive
These services are not included as part of Basic Services except to the extent provided
otherwise by attached Supplemental Agreement or Work Order and will be paid for by
OWNER as indicated in Section 5
134745v02
RNK rl019 2007
9
188
2 1 1 Preparation of applications and supporting documents in addition to those
furnished under Basic Services for private or governmental grants loans or advances in
connection with the Project preparation or review of environmental assessments and
impact statements review and evaluation of the effect on the design requirements of the
Project of any such statements and documents prepared by others and assistance in
obtaining approvals of authorities having jurisdiction over the anticipated environmental
impact of the Project
2 1 2 Review of developer s plats concept plans and assistance to developer in
preparing a plat contract administration and construction observation of developer
installed improvements review and finalization of developer s construction record
drawings and work performed in acquisition of easements
2 1 3 Field Services to make measured drawings of or to investigate existing
conditions or facilities or to verify the accuracy of drawings or other information
furnished to OWNER by others
2 14 Services resulting from significant changes in the general scope extent or
character of the Project or its design including but not limited to changes in size
complexity OWNER S schedule character of construction or method of financing and
revising previously accepted studies reports design documents or Contract Documents
when such revisions are required by changes in laws rules regulations ordinances codes
or orders enacted subsequent to the preparation of such studies reports or documents or
are due to any other causes beyond ENGINEER S control
2 1 5 Providing renderings or models for OWNER S use
2 1 6 Preparing documents for alternate bids requested by OWNER for
Contractor s work which is not executed or documents for out of sequence work
2 1 7 Investigations and studies involving but not limited to detailed
consideration of operations maintenance and overhead expenses providing value
engineering during the course of design the preparation of feasibility studies cash flow
and economic evaluations rate schedules and appraisals assistance in obtaining
financing for the Project evaluating processes available for licensing assisting OWNER
in obtaining process licensing detailed quantity surveys of material equipment and
labor and audits or inventories required in connection with construction performed by
OWNER
2 1 8 Furnishing services of independent professional associates and consultants
for other than Basic Services which include but are not limited to customary civil
structural mechanical and electrical engineering and customary architectural design
incidental thereto and providing data or services of the types described in paragraph 34
134745v02
RNK rl019 2007
10
189
when OWNER employs ENGINEER to provide such data or servIces In lieu of
furnishing the same in accordance with paragraph 34
2 1 9 Services during out of town travel required of ENGINEER other than visits
to the site or OWNER S office as required by Section 1
2 1 10 Assistance in connection with bid protests rebidding or renegotiating
contracts for construction materials equipment or services except when such assistance
is required to complete services called for in paragraph 6 2 2 5
2 1 11 Preparation of operating maintenance and staffing manuals to supplement
Basic Services under paragraph 1 7 3
2 I l2 Preparing to serve or serving as a consultant or witness for OWNER in any
litigation arbitration or other legal or administrative proceeding involving the Project
unless the ENGINEER is a defendant except for assistance in consultations which is
included as part of Basic Services under paragraphs 1 2 3 and 14 2
2 1 13 Additional services in connection with the Project including services which
are to be furnished by OWNER in accordance with Article 3 and services not otherwise
provided for in this Agreement
2 2 REQUIRED ADDITIONAL SERVICES
When required by the Contract Documents in circumstances beyond ENGINEER S
control ENGINEER shall furnish or obtain from others as circumstances require during
construction and without waiting for specific authorization from OWNER Additional
Services of the types listed in paragraphs 2 2 1 through 2 2 6 inclusive These services
are not included as part of Basic Services except to the extent provided otherwise by
attached Supplemental Agreement or Work Order ENGINEER shall advise OWNER
promptly after starting any such additional services which will be paid for by OWNER as
indicated in Section 5
2 2 1 Services in connection with work directive changes and change orders to
reflect changes requested by OWNER if the resulting change in compensation for Basic
Services is not commensurate with the additional services rendered
2 2 2 Services in making revisions to Plans and Specifications occasioned by the
acceptance of substitutions proposed by Contractor s and services after the award to
each contract in evaluating and determining the acceptability of an unreasonable or
excessive number of substitutions proposed by Contractor
134745v02
RNK r10 19 2007
11
190
2 2 3 Services resulting from significant delays changes or price increases
occurring as a direct or indirect result of material equipment or energy shortages
2 24 Additional or extended services during construction made necessary by 1
work damaged by fire or other cause during construction 2 a significant amount of
defective or neglected work of any Contractor 3 acceleration of the progress schedule
involving services beyond normal working hours and 4 default by any Contractor
2 2 5 Services other than Basic Services during the Operational Phase in
connection with any partial use of any part of the Project by OWNER prior to Substantial
Completion
2 2 6 Evaluating an unreasonable or extensive number of claims submitted by
Contractor s or others in connection with the work
SECTION 3 0WNER S RESPONSIBILITIES
OWNER shall do the following in a timely manner so as not to delay the services of
ENGINEER
3 1 Designate in writing a person to act as OWNER S representative with respect to
the services to be rendered under this Agreement such person shall have complete
authority to transmit instructions receive information interpret and define OWNER S
policies and decisions with respect to ENGINEER S services for the Project
32 Provide criteria and information as to OWNER S requirements for the Project
including design objectives and constraints space capacity and performance
requirements flexibility and expandability and any budgetary limitations and furnish
copies of design and construction standards OWNER will require to be included in the
Plans and Specifications
3 3 Assist ENGINEER by placing at ENGINEER S disposal all available information
pertinent to the Project including previous reports and any other data relative to design or
construction ofthe Project
34 Furnish to ENGINEER as required for performance of ENGINEER S Basic
Services except to the extent provided otherwise by attached amendment the following
34 1 Data prepared by or services of others including without limitation
borings probings and subsurface explorations hydrographic surveys laboratory tests and
inspections of samples materials and equipment
34 2 Appropriate professional interpretations of all the foregoing
134745v02
RNK r1019 2007
12
191
34 3 Environmental assessment and impact statements
34 4 Property boundary easement right of way topographic and utility
surveys
34 5 Property descriptions
34 6 Zoning deed and other land use restrictions and
34 7 Other special data or consultations not covered in Section 2
all of which ENGINEER may use and rely upon in performing services under this
Agreement
3 5 Provide engineering surveys or authorize ENGINEER to establish reference points
for construction to enable Contractor s to proceed with the layout of the work
3 6 Arrange for access to and make all provisions for ENGINEER to enter upon
public and private property as required for ENGINEER to perform services under this
Agreement
3 7 Examine all studies reports sketches Drawings Specifications proposals and
other documents presented by ENGINEER Obtain advice of an attorney insurance
counselor and other consultants as OWNER deems appropriate for such examination and
render in writing decisions pertaining thereto within a reasonable time so as not to delay
the services of ENGINEER
3 8 Furnish approvals and permits from all governmental authorities having
jurisdiction over the Project and such approvals and consents from others as may be
necessary for completion of the Project
3 9 Provide such accounting independent cost estimating and insurance counseling
services as may be required for the Project such legal services as OWNER may require
or ENGINEER may reasonably request with regard to legal issues pertaining to the
Project including any that may be raised by Contractor s such auditing service as
OWNER may require to ascertain how or for what purpose any Contractor has used the
monies paid under the construction contract and such inspection services as OWNER
may require to ascertain that Contractor s are complying with any law rule regulations
ordinance code or order applicable to their furnishing and performing the work
310 If OWNER designates a person to represent OWNER at the site who is not
ENGINEER or ENGINEER S agent or employee the duties responsibilities and
134745v02
RNK r10 19 2007
13
192
limitations of authority of such other person and the affect thereof on the duties and
responsibilities of ENGINEER and the Resident Project Representative and any
assistants will be set forth in an exhibit that is to be identified attached to and made a
part of this Agreement before such services begin
3 11 If more than one prime contract is to be awarded for construction materials
equipment and services for the entire Project designate a person or organization to have
authority and responsibility for coordinating the activities among the various prime
contractors
3 12 Furnish to ENGINEER data or estimated figures as to OWNER S anticipated costs
for services to be provided by others for OWNER such as services pursuant to
paragraphs 3 7 through 3 11 inclusive and other costs of the types referred to in
paragraph 1 2 6 so that ENGINEER may make the necessary findings to support
opinions of probable Total Project Costs
3 13 Attend the pre bid meeting bid opening pre construction meetings construction
progress and other job related meetings and substantial completion inspections and final
payment inspections
3 14 Give prompt written notice to ENGINEER whenever OWNER observes or
otherwise becomes aware of any development that affects the scope of timing of
ENGINEER S services or any defect or nonconformance in the work of any Contractor
3 15 Furnish or direct ENGINEER to provide Additional Services as stipulated in
paragraph 2 1 of this Agreement or other services as required
3 16 Bear all costs incident to compliance with the requirements of this Section 3
SECTION 4 PERIODS OF SERVICE
4 1 The provisions of Section 4 and the various rates of compensation for
ENGINEER S services provided for elsewhere in this Agreement have been agreed to in
anticipation of the orderly and continuous progress of the Project through completion of
the Construction Phase ENGINEER S obligation to render services hereunder will
extend for a period which may reasonably be required for the design award of contracts
construction and initial operation of the Project including extra work and required
extensions thereto
4 2 The services called for in the Study and Report Phase will be completed and the
Report submitted within the agreed period after written authorization to proceed with that
phase of services which will be given by OWNER
134745v02
RNK r1 019 2007
14
193
4 3 After acceptance by OWNER of the Study and Report Phase documents indicating
any specific modifications or changes in the general scope extent or character of the
Project desired by OWNER and upon written authorization from OWNER ENGINEER
shall proceed with the performance of the services called for in the Preliminary Design
Phase and shall submit preliminary design documents and a revised opinion of probable
Total Project Costs within the agreed period
44 After acceptance by OWNER of the Preliminary Design Phase documents and
revised opinion of probable Total Project Costs indicating any specific modifications or
changes in the general scope extent or character of the Project desired by OWNER and
upon written authorization from OWNER ENGINEER shall proceed with the
performance of the services called for in the Final Design Phase and shall deliver
Contract Documents and a revised opinion of probable Total Project Costs for all work of
Contractor s on the Project within the agreed period
4 5 ENGINEER S services under the Study and Report Phase Preliminary Design
Phase and Final Design Phase shall each be considered complete at the earlier of 1 the
date when the submissions for that phase have been accepted by OWNER or 2 thirty
30 days after the date when such submissions are delivered to OWNER for final
acceptance plus in each case such additional time as may be considered reasonable for
obtaining approval of governmental authorities having jurisdiction to approve the design
of the Project
4 6 After acceptance by OWNER of the ENGINEER S Drawings Specifications and
other Final Design Phase documentation including the most recent opinion of probable
Total Project Costs and upon written authorization to proceed ENGINEER shall proceed
with performance of the services called for in the Bidding or Negotiating phase This
Phase shall terminate and the services to be rendered thereunder shall be considered
complete upon commencement of the Construction Phase or upon cessation of
negotiations with prospective Contractor s except as may otherwise be required to
complete the services called for in paragraph 6 2 2 5
4 7 The Construction Phase will commence with the execution of the first prime
contract to be executed for the work of the Project or any part thereof and will terminate
upon written recommendation by ENGINEER of final payment on the last prime contract
to be completed Construction Phase services may be rendered at different times in
respect of separate prime contracts if the Project involves more than one prime contract
4 8 The Operational Phase will commence during the Construction Phase and will
terminate one year after the date of Substantial Completion as defined in the Contract
Documents if the last prime contract for construction materials and equipment on which
substantial completion is achieved
134745v02
RNK rI019 2007
15
194
4 9 If OWNER has request for significant modifications or changes in the general
scope extent or character of the Project the time of performance of ENGINEER S
services shall be adjusted equitably
4 10 OWNER shall give prompt authorization to proceed or not proceed with any phase
of services after completion of the immediately preceding phase
4 11 If ENGINEER S services for design or during construction of the Project are
delayed or suspended in whole or in part by OWNER for more than three 3 months for
reasons beyond ENGINEER S control ENGINEER shall on written demand to OWNER
but without termination of this Agreement be paid as provided in paragraph 5 32 If
such delay or suspension extends for more than one year for reasons beyond
ENGINEER S control or if ENGINEER for any reason is required to render Construction
Phase services in respect of any prime contract for construction materials or equipment
more than one year after Substantial Completion is achieved under that contract the
various rates of compensation provided for elsewhere in this Agreement shall be subject
to equitable adjustment
4 12 In the event that the work designed or specified by ENGINEER is to be furnished
or performed under more than one prime contract or if ENGINEER S services are to be
separately sequenced with the work of one or more prime contractors such as in the case
of fast tracking OWNER and ENGINEER shall prior to commencement of the Final
Design Phase develop a schedule for performance of ENGINEER S services during the
Final Design Bidding or Negotiating and Construction Phases in order to sequence and
coordinate properly such services as are applicable to the work under such separate
contracts
SECTION 5 PAYMENTS TO ENGINEER
5 1 METHODS OF PAYMENT FOR SERVICES AND EXPENSES OF
ENGINEER
5 1 1 For Basic Services OWNER shall pay ENGINEER for Basic Services
rendered under Section 1 by one of the following methods or as specified by
Supplemental Agreement or Work Order for each project
5 1 1 1 The fee for all Basic Services except services of ENGINEER S
Resident Project Representative and assistants furnished under
paragraph 1 6 2 1 shall mean a fee based upon Schedule A
5 1 1 2 Upon request of the OWNER the ENGINEER shall submit a written
not to exceed cost for the Study and Report Phase If the project
proceeds the amount paid for this phase will be deducted from the
134745v02
RNK r 1019 2007
16
195
5 1 13
overall fee charged The maximum amount to be deducted will not
exceed twenty percent 20 of the total possible fee for the project
Resident Project Services For services of ENGINEER S Resident
Project Representative and assistants furnished under paragraph
1 6 2 1 on the basis of Hourly Costs in accordance with Schedule B
for services rendered by principals and employees assigned to
resident Project representation
5 12 For Additional Services OWNER shall pay ENGINEER for Additional
Services rendered under Section 2 as follows
5 12 1
5 1 2 2
General For Additional Services of ENGINEER S principals and
employees engaged directly on the Project and rendered pursuant to
paragraph 2 1 or 2 2 on the basis of ENGINEER S Hourly Costs in
accordance with Schedule B
Professional Associates and Consultants For services and
Reimbursable Expenses of independent professional associates and
consultants employed by ENGINEER to render Additional Services
pursuant to paragraph 2 1 or 2 2 the amount billed to ENGINEER
therefor times a factor of 1 0 unless otherwise specified in the
Supplemental Agreement
5 1 3 For Reimbursable Expenses In addition to payments provided for in
paragraphs 5 1 1 and 5 12 OWNER shall pay ENGINEER the actual costs of all
Reimbursable Expenses incurred in connection with all Basic and Additional Services
5 14 As used in this paragraph 5 1 the terms Hourly Costs and Reimbursable
Expenses have the meanings assigned to them in paragraph 54 and the term
Construction Cost has the meaning assigned to it in paragraph 6 1 When Construction
Cost is used as a basis for payment it will be based on one of the following sources with
precedence in the order listed for work designed or specified by ENGINEER
5 14 1
51 4 2
134745v02
RNK r1019 2007
For completed construction work the total construction cost of all
work performed as designed or specified by ENGINEER unless
otherwise specified in the Supplemental Agreement to include the
mathematical average of the lowest two responsible bids received
For work designed or specified but not constructed the lowest bona
fide bid received from a qualified bidder for such work or if the
work is not bid the lowest bona fide negotiated proposal for such
work
17
196
5 14 3 For work designed or specified but not constructed upon which no
such bid or proposal is received the most recent estimate of
Construction Cost or if none is available ENGINEER S most recent
opinion of probable Construction Cost
No deduction is to be made from Construction Costs on account of any penalty
liquidated damages or other amounts withheld from payments to Contractor s
5 2 TIMES OF PAYMENTS
5 2 1 ENGINEER shall submit monthly statements for Basic and Additional
Services rendered and for Reimbursable Expenses incurred The statements will be based
upon ENGINEER S estimate of the proportion of the total services actually completed at
the time of billing OWNER shall make prompt monthly payments in response to
ENGINEER S monthly statements
5 2 2 Upon conclusion of each phase of Basic Services OWNER shall pay such
additional amount if any as may be necessary to bring total compensation paid on
account of such phase to the following percentages of total compensation payable for all
phases of Basic Services
Phase Percentage
Study and Report
Preliminary Design incField Surveys
Final Design
Bidding or Negotiating
Construction
Operational incRecord Drawings
10
40
28
2
10
10
100
5 23 ENGINEER shall comply with Minnesota Statute 471 425 ENGINEER
must pay Subcontractor for all undisputed services provided by Subcontractor within ten
days of ENGINEER S receipt of payment from OWNER ENGINEER must pay interest
of 1 5 percent per month or any part of a month to Subcontractor on any undisputed
amount not paid on time to Subcontractor The minimum monthly interest penalty
payment for an unpaid balance of 100 or more is 10
5 3 OTHER PROVISIONS CONCERNING PAYMENTS
53 1 If OWNER fails to make any payment due ENGINEER for services and
expenses within thirty 30 days after receipt of ENGINEER S statement therefor the
134745v02
RNK r 1019 2007
18
197
amounts due ENGINEER will be increased at the rate of one half percent 1 2 per
month from said thirtieth day and in addition ENGINEER may after giving seven 7
days written notice to OWNER suspend services under this Agreement until
ENGINEER has been paid in full all amounts due for services expenses and charges
5 3 2 In the event of termination by OWNER under paragraph 7 1 upon the
completion of any phase of the Basic Services progress payments due ENGINEER for
services rendered through such phase shall constitute total payment for such services In
the event of such termination by OWNER during any phase of the Basic Services
ENGINEER will be paid for services actually and necessarily rendered during that phase
by ENGINEER S principals and employees engaged directly on the Project on the basis
of ENGINEER S Hourly Costs on Schedule B to date of termination
In the event of any such termination ENGINEER also will be reimbursed for the
reasonable charges of independent professional associates and consultants employed by
ENGINEER to render Basic Services and paid for all unpaid Additional Services and
unpaid reimbursables
53 3 Records of ENGINEER S Hourly Costs pertinent to ENGINEER S
compensation under this Agreement will be kept in accordance with generally accepted
accounting principles Copies will be made available to OWNER at cost on request prior
to final payment for ENGINEER S services
5 34 Whenever a factor is applied to Hourly Costs in determining compensation
payable to ENGINEER that factor will be adjusted periodically and equitably to reflect
changes in the various elements that comprise such factor All such adjustments will be in
accordance with generally accepted accounting practices as applied on a consistent basis
by ENGINEER and consistent with ENGINEER S overall compensation practices and
procedures
5 4 DEFINITIONS
54 1 The Hourly Costs used as a basis for payment mean salaries and wages
basic and incentive paid to all ENGINEER S personnel engaged directly on the Project
including but not limited to engineers architects surveyors designers draftsmen
specification writers estimators other technical and business personnel plus the cost of
customary and statutory benefits including but not limited to social security
contributions unemployment excise and payroll taxes workers compensation health
and retirement benefits sick leave vacation and holiday and other group benefits For the
purposes of this Agreement the principals of ENGINEER and their Hourly Costs are as
shown on Schedule B The Hourly Costs of principals of ENGINEER will be adjusted
equitably to reflect changes in personnel and in ENGINEER S overall compensation
procedures and practices
134745v02
RNK r1019 2007
19
198
54 2 Reimbursable Expenses means the actual reasonable expenses incurred by
ENGINEER or ENGINEER S independent professional associates or consultants directly
or indirectly in connection with the Project such as expenses for transportation and
subsistence incidental thereto obtaining bids or proposals from Contractor s providing
and maintaining field office facilities including furnishings and utilities subsistence and
transportation of Resident Project Representatives and their assistants toll telephone calls
and telegrams reproduction of reports Drawings Specifications Bidding Documents
and similar Project related items in addition to those required under Section 1 and if
authorized in advance by OWNER overtime work requiring higher than regular rates
SECTION 6 CONSTRUCTION COST AND OPINIONS OF COST
6 1 CONSTRUCTION COST
The construction cost of the entire Project herein referred to as Construction Cost
means the total cost to OWNER of those portions of the entire Project designed and
specified by ENGINEER but it will not include indirect costs such as ENGINEER S
compensation and expenses the cost of land rights of way or compensation for or
damages to properties unless this Agreement so specifies nor will it include OWNER S
legal accounting insurance counseling or auditing services or interest and financing
charges incurred in connection with the Project or the cost of other services to be
provided by others to OWNER pursuant to paragraphs 3 7 through 3 11 inclusive
Construction Cost is one of the items comprising Total Project Cost which is defined in
paragraph 1 2 6
6 2 OPINIONS OF COST
6 2 1 Since ENGINEER has no control over the cost of labor materials
equipment or services furnished by others or over the Contractor s methods of
determining prices or over competitive bidding or market conditions ENGINEER S
opinions of probable Total Project Costs and Construction Cost provided for herein are to
be made on the basis of ENGINEER S experience and qualifications and represent
ENGINEER S best judgment as an experienced and qualified professional engineer
familiar with the construction industry but ENGINEER cannot and does not guarantee
that proposals bids or actual Total Project or Construction Costs will not vary from
opinions of probable cost prepared by ENGINEER If prior to the Bidding or Negotiating
Phase OWNER wishes greater assurance as to Total Project or Construction Costs
OWNER shall employ an independent cost estimator as provided in paragraph 3 9
6 2 2 If a Construction Cost limit is established by a written agreement between
OWNER and ENGINEER and specifically set forth in this Agreement as a condition
thereto the following will apply
134745v02
RNK r 1019 2007
20
199
6 2 2 1
6 2 2 2
6 2 23
6 2 24
6 2 2 5
134745v02
RNK r10 19 2007
The acceptance by OWNER at any time during the Basic
Services Additional Services of a revised opinion of probable Total
Project or Construction Costs in excess of the then established cost
limit will constitute a corresponding revision in the Construction
Cost limit to the extent indicated in such revised opinion
Any Construction Cost so established will include a contingency of
ten percent 10 unless another amount is agreed upon in writing
ENGINEER will be permitted to determine what types of materials
equipment and component systems are to be included in the Plans
and Specifications and to make reasonable adjustments in the
general scope extent and character of the Project to bring it within
the cost limit
If the Bidding or Negotiating Phase has not commenced within six
6 months after completion of the Final Design Phase the
established Construction Cost limit will not be binding on
ENGINEER and OWNER shall consent to an adjustment in such
cost limit commensurate with an applicable change in the general
level of prices in the construction industry between the date of
completion of the Final Design Phase and the date on which
proposals or bids are sought
If the lowest bona fide proposal or bid exceeds the established
Construction Cost limit OWNER shall 1 give written approval to
increase cost limit 2 authorize negotiating or rebidding the Project
within a reasonable time or 3 cooperate in revising the Project s
general scope extent or character to the extent consistent with the
Project s requirements and with sound engineering practices In the
case of 3 ENGINEER shall modify the Contract Documents as
necessary to bring the Construction Cost within the cost limits In
lieu of other compensation for services in making such
modifications OWNER shall pay ENGINEER ENGINEER S
Reimbursable Expenses but without profit to ENGINEER on
account of such services The providing of such service will be the
limit of ENGINEER S responsibility in this regard and having done
so ENGINEER shall be entitled to payment for services in
accordance with this Agreement and will not otherwise be liable for
damages attributable to the lowest bona fide proposal or bid
exceeding the established Construction Cost
21
200
SECTION 7 GENERAL CONSIDERATION
7 1 TERMINATION
The obligation to provide further services under this Agreement may be terminated by
OWNER upon two 2 days written notice to the ENGINEER
7 2 REUSE OF DOCUMENTS
All documents including Plans and Specifications prepared or furnished by ENGINEER
and ENGINEER S independent professional associates and consultants pursuant to this
Agreement are instruments of service in respect of the Project and the OWNER will be
provided with original record drawing copies for information and reference in connection
with the use and occupancy of the Project by OWNER and others however such
documents are not intended or represented to be suitable for reuse by OWNER or others
on extensions of the Project or on any other project Any reuse without written
verification or adaptation by ENGINEER for the specific purpose intended will be at
OWNER S sole risk
7 3 MINNESOTA GOVERNMENT DATA PRACTICES ACT
The ENGINEER must comply with the Minnesota Government Data Practices Act
Minnesota Statutes Chapter 13 as it applies to 1 all data provided by the City pursuant
to this Agreement and 2 all data created collected received stored used maintained
or disseminated by the ENGINEER pursuant to this Agreement The ENGINEER is
subject to all the provisions of the Minnesota Government Data Practices Act including
but not limited to the civil remedies of Minnesota Statutes Section 13 08 as if it were a
government entity In the event the ENGINEER receives a request to release data the
ENGINEER must immediately notify the OWNER The OWNER will give the
ENGINEER instructions concerning the release of the data to the requesting party before
the data is released ENGINEER agrees to defend indemnify and hold the OWNER its
officials officers agents employees and volunteers harmless from any claims resulting
from ENGINEER S officers agents owners partners employees volunteers
assignees or subcontractors unlawful disclosure andor use of protected data The terms
of this paragraph shall survive the cancellation or termination of this Agreement
7 4 INSURANCE
74 1 ENGINEER shall secure and maintain such insurance as will protect
ENGINEER from claims under the Worker s Compensation Acts and from claims for
bodily injury death or property damage which may arise from the performance of
services under this Agreement Such general liability insurance shall be written for
amounts not less than the following
134745v02
RNK r1019 2007
22
201
Bodily Injury
General Automobile
General Automobile
1 000 000 Each Person
1 000 000 Each Occurrence
Property Damage
General Automobile
General
1 000 000 Each Occurrence
1 000 000 Aggregate
The OWNER shall be named as an additional insured on the policy
74 2 Professional Liability Insurance The ENGINEER shall secure and
maintain a professional liability insurance policy Said policy shall insure payment of
damages for legal liability arising out of the performance of professional services for the
OWNER in the insured s capacity as ENGINEER if such legal liability is caused by an
error omission or negligent act of the insured or any person or organization for whom
the insured is legally liable Said policy shall provide minimum limits of 1 000 000 with
a deductible maximum of 300 000 and shall state that such insurance cannot be
cancelled until thirty 30 days after the OWNER has received written notice upon
request of the insurer s intention to cancel this insurance The OWNER shall be named
as an additional insured on the policy
74 3 Before commencing work the ENGINEER shall provide the OWNER a
certificate of insurance evidencing the required insurance coverage in a form acceptable
to OWNER
7 5 INDEMNIFICATION
The ENGINEER agrees to the fullest extent permitted by law to indemnify and hold
OWNER harmless from any damage liability or cost including reasonable attorney s
fees and costs of defense to the extent caused by ENGINEER s negligent acts errors or
omissions in the performance of professional services under this Agreement and those of
his or her subcontractors or anyone for whom the ENGINEER is liable
7 6 CONTROLLING LAW
This Agreement is to be governed by the laws of the State of Minnesota
7 7 SUCCESSORS AND ASSIGNS
7 7 1 OWNER and ENGINEER each is hereby bound and the partners
successors executors administrators and legal representatives of OWNER and
ENGINEER and to the extent permitted by paragraph 7 6 2 the assigns of OWNER and
134745v02
RNK r 1019 2007
23
202
ENGINEER are hereby bound to the other party to this Agreement and to the partners
successors executors administrators and legal representatives and said assigns of such
other party in respect of all covenants agreements and obligations of this Agreement
7 7 2 Neither OWNER nor ENGINEER shall assign sublet or transfer any rights
under or interest in including but without limitation monies that may become due or
monies that are due this Agreement without the written consent of the other except to
the extent that any assignment subletting or transfer is mandated by law or the effect of
this limitation may be restricted by law Unless specifically stated to the contrary in any
written consent to an assignment no assignment will release or discharge the assignor
from any duty or responsibility under this Agreement Nothing contained in this
paragraph shall prevent ENGINEER from employing such independent professional
associates and consultants as ENGINEER may deem appropriate to assist in the
performance of services hereunder
7 7 3 Nothing under this Agreement shall be construed to give any rights or
benefits in this Agreement to anyone other than OWNER and ENGINEER and all duties
and responsibilities undertaken pursuant to this Agreement will be for the sole and
exclusive benefit of the OWNER and ENGINEER and not for the benefit of any other
party
7 8 COPYRIGHT
Copyright or Patent Infringement ENGINEER shall defend actions or claims charging
infringement of any copyright or patent by reason of the use or adoption of any designs
Drawings or Specifications supplied by it and it shall hold harmless the OWNER from
loss or damage resulting therefrom
7 9 MEDIATION
7 9 1 In an effort to resolve any conflicts that arise during the design or
construction of the project or following the completion of the project the OWNER and
ENGINEER agree that all disputes between them arising out of or relating to this
Agreement shall be submitted to nonbinding mediation unless the parties agree otherwise
The OWNER and ENGINEER further agree to consider including a similar mediation
provision in all agreements with independent contractors and consultants retained for the
project and to require all independent contractors and consultants also to include a similar
provision in all agreements with subcontractors subconsultants suppliers or fabricators
so retained
SECTION 8 SPECIAL PROVISIONS EXHIBITS AND SCHEDULES
8 1 The following exhibits are attached to and made a part of this Agreement
134745v02
RNK r1 0 19 2007
24
203
8 1 1 Schedule A Fee Schedule for Basic Services
8 1 2 Schedule B Per Diem Hourly Rate Schedule for Additional Services
8 1 3 Appendix A Feasibility Report Outline
8 14 Appendix B Duties Responsibilities and Limitations of Authority of the
Resident Project Representative
8 2 This Agreement together with the Appendix and Schedules identified above
constitute the entire agreement between OWNER and ENGINEER and supersede all
prior written or oral understandings This Agreement Appendix and Schedules may only
be amended supplemented modified or cancelled by a duly executed written instrument
The remainder of this page has been intentionally left blank
Signature pages follow
134745v02
RNK rlO19 2007
25
204
IN WITNESS WHEREOF the parties hereto have made and executed this
Agreement as of the day and year first above written
Its Mayor
ENGINEER
BARR ENGINEERING COMPANY
BY JBrianLeMon
Its Vice President
OWNER
CITY OF CHANHASSEN
BY
AND
Its City Manager Clerk
ADDRESS FOR GIVING NOTICES ADDRESS FOR GIVING NOTICES
Chanhassen City Hall
7700 Market Boulevard
P O Box 147
Chanhassen Minnesota 55317
Attn Brian LeMon
Barr Engineering Company
4700 West 77th Street
Minneapolis Minnesota 55435 4803
Barr file name and path
P Mpls23 MN 1O2310095 Chanhassen Wens 13 13ProjRiskMgmt Chanhasses Wens 12 13 AGR ROF ENGRG SERVICES DOC
134745v02
RNK r1019 2007
26
205
SCHEDULE A
FEE SCHEDULES FOR BASIC SERVICES
The following fee and rate schedule are attached and will be renewed each calander year
1 Fee Schedule with hourly billing rates one page
2 Rental Equipment Rate Schedule five pages
3 Copy Production Rate Schedule one page
4 Special Computer Rate Schdule one page
134745v02
RNK r 1019 2007
27
206
BARR Fee Schedule 2007 Rev 01 01 07
Description
Rate4
dollars
Principal Engineer Scientist 90 190
Senior Consultants1 90 180
S E IS t 1 80120emornglneerC1en1st
Engineer SCientist1 5590
Com puter Specialist 55 120
SeDior Technician2 60 100
Te chnlcian2 40 75
Cqmmllnication Specjalist 10 120
SUpport Servlcerrechnlcal Manager 80155
SupporfPersonnel3 3 85
Rates for litigation support services will include a 30 surcharge
Aten percent 10 markup willbe adcled to subcontraCts for professioncilsuppcrfandconstruclion
services tocoveroverheadandillslIrance slIrcharge expenses
Invoices are payable within 30 jays ofthe dateoftheirivoice nyamOUl1tDot paid within 30 days shall
beatiriterest ftom the date 10 days afterthe date of the involceafa rateequaltothelesser of18
percent per annum or the highestrate allowed by applicable law i
R eimbtirsable expenses including but not limited to the actualarid reasonalllecosts oftransportation
meals lcidging long distanqe telephone ch rges parkingcostsi ost8ge andshippillQ charges will be
billed at actual cost Mater als and supplies charges printingcharglls and llCluipmentrentalcharges
III br binlld in accordance with Barr s standard rate schedules Mileage will be billed atthelRS
all ablerate
1 Includes engineers ec 01ogists b1olgists chemists hydrogeologists geologistsdhd strialhygiellists soU
scientiSts meteorologlstsienvirnmentalsciehtistsinformation technologyspecll 11ists ancllaridscapearChitects
2 Includes surveyors drafters CADD Operators designers cOst estimator cc nslructionobservers water air cmd
waste samplers safety techniCians interns and data managementtechllicisl ls
3 Includes word processing report production project accounting information specialist arid other project support
personnel
4 Rates do not Include sales tax on services that may be required in some states
ODMA PCDOCS D0CS247848 1
207
BARR Rental Equipment Rate Schedule 2007
Alphabetized
see general and end notes
Rev 01 01 07
Sheet 10f 5
Del cription
Daily Rate
dollars
Non Expendable Equipment
Air Quality
Air Cool d M5 Prope Oven Assembly 300 00
AmbientSQiJ jIonitor 1 00 00
AI1i3 lyier Filter oven 11 00
Analyzer StlPP ort Kit a 400 00
Ariemqmeter 50 50
CoAn alyzir 16tlOO
Co Calle et qf 33 50
Co oz C i RetililafCii set of 2 17 oo
Data Logger 33 50
DlIlltionCiilibtatof 200 00
Dual PElt trip Chart 45110
EPA 26 J al1k1Tnip S et 11 75
EP A 6 So Anaiysis Kit 56 00
EPA Method Z T3NMO Sampling Train 252 00
EPA Methld ORSATTrain 22 50
EPA Meth od SaJl1Pllng train 3El4 00
EPA Method5WettesiMelet Calibrator 224 00
i t r l i i g
Heated Sample Line 150 1 00 00
HeatellSample Ine 50 qe oo
HiSh Fiow Pump each 38 00
HiVol Ambietit caL Klt 22 0
Hydrocarbor CalibrationGases 56 00
HYdrocarbon Regulator Set 28 00
Low Flciw Pumps each 28 00
Met Station Calibration Kit 116 50
Midget lmpinger Sample Une 60 00
Midgetlmpi ngerSampling Train 1 1 OO
NCASI S mple Train 35 00
N0x Ahalyter 224 00
NOj Cal Gases set of 2 a 60
NOxfSO Regulatots sei of 2 22 50
0z C02 Analyter 168 00
021 CO2 CalGase s set of 2 33 50
Portable oxYgen A nalyzer 28 00
Single Peri Strip Chart Recorder 33 50
g rb G
i i 5 g
TSP HiVol Sampler 2 00
Universaleontrol Console Vost Meter 173 50
Volumetric Air Flow Meesurement Kit 61 00
Field Equipment
1 jnch SUbmersible Purge Pump 35 00
Alpha Water Bottle each usage 3 00
AreaNelocityFlowmeter 12 00
Automatic Sampler with Depth Sensor and Flowmeter 18 00
Automatic Sampt er 9 00
Cleaning Calibration Certification 125 00
OOMA PCDOCS DOCS247821 1
208
BARR Rental Equipment Rate Schedule2007
Alphabetized
see general and end notes
Rev 01 01 07
Sheet 2 of 5
Daily Rate
dollarsDescription
Conductivity Meter 17 50
Current Meter Suspensiori Kit 55 00
Data Logger Hermit 61 00
Data Trarisfer System 22 00
Depth Seihsot Flowtll ter Orily 10 00
Dissolved Oxygen Meter 29 00
DissolvedOxygenlColldllctivity Meter 31325
Dissolved Oxygen Sensor Data Logger System 3 oO
DriilRdfoot 2 50
i i f g ii
Field Rugged laptopfPockef PC 25 00
Auori meter 17 50
GA 90 or c EM400o Landfill Gas Analyzer 87 00
Gas Centrif1J9ElI Pump 26 75
GasGEmer t r 29 O
GroundwatElf Hang PlJmp 14 50
Hand VaciJum PiJmp 2 30
S i iit1 i
KemmererVeitjc rBottleSampler 3 5o
Magnetorrll ter L
116 00
Multi paramiter Suiface Water Datalogger 19 75
Oil Water lnfeipllase Prbe 87 00
Peristaltic Pump 41 75
Petite Ponar Oredge 14 50
pH Meter 27 75
Portable Colorimeter 34 75
Portable Doppler Ultrasonic Flow Meter 69 00
Portable Field Scale 15 00
Pressure Transducer 40 50
Sediment Corer each usage 5 75
Seisgun 60 00
Soil C ore Sarnplerlaucket Auger 29 0
Soil Gas Recovery ystem 191 00
SOil VaporEXtraction System 133 00
Sontek ADY AcclJstic Doppler Velocimeter 128 00
Split lube SoU firobelHand Auger 8 75
SlElinless SteeIBailer each osage 18 50
Submers ibie Purnp L on 60 00
Temperature Dafalogger 1 50
Tent
1 5 00
Turbidimeter 14 00
Underwa terVlewin i System 60 00
Water Levelftemperafure Probe Datalogger MiniTroll or level Troll 62 00
water QualitY Meter YSI556 MPS 75 00
WellLevellndiCC1tor 22 00
Zooplankton Net
7 00
Zooplankton 145 00
Materials and Testing
Brass Sieve Set 6 00
Chlorophyll a 60 00
ODMAPCDOCS OOCS 247821 1
209
BARR Rental Equipment Rate Schedule2007
Alphabetized
see general and end notes
Rev 01 01 07
Sheet 3 of 5
Description
Daily Rate
dollars
Coarse Sieve Set 1 0 00
Concrete Air Meter 36 00
Concrete Test Hammer 40 50
DL Plus Ultrasonic Kit 37DL 36DL 26XTDL 62 OO
Dual Mass Dynamic Cone Penetrometer 50 00
Dye Penetrant Kit
22 00
Hand Vane Shear Q 50
Heavy Duty Balance 16 QO
Horizontal Sample Ejector 25 0
Kessler Field Moisture Oven 45 00
Laboratory Analysis 7 00
Laboratory ServiCes 2 50
Liquid Limit Set 7 50
Magnetic Crawler 48 00
Magnetic Particle Kit 38 00
Metal Thickness Gauge 107 00
Paint Thickness Gauge
15 00
Phytoplankton 145 00
Platform Beam Scale
14 75
Pneumatic Pressure Indicator 11 5Ci
t i t g
Sand Cone Set n
1 O j
Sinco lncliriometer Probe 200 00
Soluble Reactive Phosphorus
213 00
Torvane Shear Device 0 2 50
Total Dissolved Phosphorus 30 00
Total Nitrogen TN 40 00
Total Phosphorus TP 23 00
Vibrating Wire Logger VW21 04 24 00
Weld Inspection Equipment
12 00
Safety
5 Minute Escap e Pack ELSA 6 00
AerosollDust Monitor Mlniram PDM 3 or PDR 1000 67 15
Calibration Gas Kit 8 75
CO Monitor ISC T82 36 00
Combustible Gas IndiCator M40 orlSC MX251 45M
Combustible Gas Indicator MSA 260 360 58 00
Confined Space Rescue Retrieval Equipment 295 00
Confined Space Ventilator 5 t7
DetectorTUbe Pump 15 00
DL 101 11 7 eV Conversion Kit 20 00
Drager Chip MeasurElment System 75 00
Dry Cell Air Flow Calibrator 50 00
Flame Ionization Detector TVA 1 000 13S 00
Flotation Worksuit
19 75
Full Face Respirator 8 00
HiS Meter I S C T40 27 00
H2SO2 and LEL Meter 48 75
Half Face Respirator 6 00
OVM 580B 11 8eV Lamp Conversion Kit 14 00
Photoionization Detector OVM 5808 11 O OD
Radiation Monitor 9 25
Recording Photoionization Detector Hnu DL 101 or DL 102 110 00
ODMA PCDOCSD0C 247821 1
210
SARR Rental Equipment Rate Schedule 2007
Alphabetized
see general and end notes
Rev 01 01 07
Sheet 4 of 5
Description
Daily Rate
dollars
Self Contained Breathing Apparatus SCBA 63 75
Self Retracting Lifeline 30 56 00
Sound LeYel Meter 48 75
Supplied A r Breathing System with SCBA 75 50
Surv y
16 Johh Boat Trailer 52 00
20 HP Outboard Molor 48 50
Canoe 21 75
Chairt Saw 23 00
Cornri1unic atiorl Radios set 17 75
DifferentialGPS Syste ri1 90 00
Hand ce Auger 7 00
Harid Held GPS Digital Camera Kit 22 00
Hand Held laser Meter 65 00
Iron Locator 17 50
I it i g
Recording pepth Locator 37 00
Robotic Total Statioll per hour 4 hour minimum A5 00
RTKGPS SUrveYSystem per hour 4hoUrmlnimUni 55 00
Spectra LaserLever 25 00
SurVey Notebook Computer 28 75
Survey Set t elel Tripod and Rod 20 75
Total tatlon SUrveyS et Complete 116 50
Total Station SiJrveySet 65 00
Trolling Motor and Battery 48 00
Vehicles and Trailers
4WD AIl TernilnVehicle 89 50
Air Sampling Trailer 38 00
Heavy TrailerMileage in addition to vehicle mileage at IRS rate 0 25
Utility Trailer 35 00
Vehicle 2WO Field 45 00
Vehicle 4WO Field 60 00
Vehlt le per lJal Q 45 00
Vehicle CuPe Truck 75 00
Vehicle UImty bl 35 00
Vehicle Mileage company and personal IRS Rate
CommunicationS8ncllmaging
35mrn Carneras cIay 3 00
Cellular Telephcmesilncluding Air Time day 11 00
Digital CamerCl Kit 1 2 00
Professlonal Format Still Camera Kit 75 50
Video Camera day 20 00
Expendaire Field Supplies
3 8 lnch J O PVC Tubing per foot 0 35
3 8 lnch I D Silicone Pump Tubing per foot 6 15
35mm Print Film 12 Exposure roU 3 95
35mm Print Film 24 Exposure roll 5 25
35mm Print Film 36 Exposure roll 6 85
35mm Slide Film 24 Exposure roU 7 60
35mm Slide Film 36 Exposure roll 10 50
ODMAIPCDOCSID0CS247821 1
211
BARR Rental Equipment Rate Schedule 2007
Alphabetized
see general and end notes
Rev 01 01 07
Sheet 5 of 5
Description
Daily Rate
dollars
4 mil Quart ReclosableBag pack of 50 3 25
500 ml Disposable Filtration Apparatus each 13 00
Acid Suit each i 70 00
Bact Covers pair 4 05
Colorimetric Water Analysis Kit each test 1 90
Compressed Air e ch 300 t 16 00
Compressed Air each 45 cf 2 50
Detector Tubes each 7 00
Disposable 5mm camera each 13 50
Disposable PanoramIc camera each 11 75
Distilled Water each 3 50
DtGlove pair 1 50
Encore Sampler 25 Giam 10 00
Fabric Soil Sample Bag each 3 75
Field BookConstruction Diary 18 00
Five GalloTl Pail with Lid 8 00
Ice per bag 1 50
InLine GrundwaterFilter each 16 00
Lath 4 bundle 19 25
Lock each 13 75
Ne9prene Glovelpir 3 75
Nitrile Gloves pliir 2 35
Paint Can A G iIlCin impty each 1 25
Paper TClweh per roll 1 21
Poly Coated TyYek c overall each 7 75
Respirator Cartridges each 12 75
Sarl mex Tyvek Coverall each 1 9 00
r y 4t
Stakes bundle 16 00
Surgical Gloves pair 0 30
Tyvek Kleenguard Coverall each 6 75
Viton Gloves pak 50 00
Weighted Disposable Bailer each 4 75
Winter Glove Liner pair 3 00
Winter Gloves pair 8 65
General Notes Applicable to all Equipl1Elnt Listedoii this Schedule
1 Minimumreiital lfiliod is 0 5 days
2 Rental chargesbegiii on theftrst daythe equipment is used on a projecl
3 Renta chargesEmd on thelasi day the equlpinentis used on a project
4 A 25 percent weekly rate dlscountwill applyioejuipmentrenlill for 5 or more days
5 A 40 percentmcintfilydlsoountwlllapjilytoequlpmerit rental for 20 or more days
G EquivalEint equipmeritfmcidels niay be substituted for the items listed
EndNotes Applicable to Only thegquipment Noted
a Analyzer SUPpc1I1Kiljncludes th efolloWiI19 Airflow KIt Total Hydrocarbon Analyzer NOX Analyzer CO Analyzer 02 Meier S02
Analyzer co2l02 AJlalyZer HealedSample Une 50 HeatedSample UneJ100 Gas Conditioner Heated Filter Box Single Pen
Recorder Dual PenStrip Chart pata logger C3 C4 Cal Gases set NOXlS02CalGases set CO Cal Gases set C02l02 Cal
Gas set of 2 S02Cal Gas set of 2 C3 Regulator Set NOXlS02 Regulators setof 2 and CO C02l02 Regulators set of 2
b Vehicles older than 1997
c Employee personal vehicles subjected to field offsite transport or other severe duty
OOMAPCDOCS DOCSI247621 1
212
BARR Copy Production Rate Schedule 2007 Companywide
Rev 01 01 07
Sheet 1 of 1
Description
Rate
dollar
Reproduction
Photo Copies large format
All sIZEl 2 00
Xerox Copier
e s0 k g
Photocopies 8 x11 11 x 17 oJ 7
Fax HO
0 75
Color Copies 0 80
Plotter
BondN ellum 2 00 sq ft
Photo Grade 4 00 sq ft
Laser 11 x 17 0 50
Xeroxrrektronix Color Printers A aSlZe
All sizes 0 50
Overhead Transparency 1 00
Binding eaCh
DElpendent on size 2 00 1 0 00
ODMACDOCS DOCS247824 1
213
BARR Special Computer RateSchedule 2007 Companywide
Rev 01J01 07
Sheet 1 of 1
Description
Rate
dollar
IBM PC
A Software 15 hour
ArcCAD J quisChertlistry fastTABs GeBase GMS MLAE M MT3D MYGRT Risk
Asslstant SEEP SIGMA SLAEM VEXCEL WSPPO XP SWMM
8 Software T 8 hour
ACf DLT ALGOR AQTESc t V ArcVi vrBarrAirEirllsslbn bAMI3R ecartes
FiAC GiNT P9riI19 Log GT Gs ljydrqGAP HYdro Gliertl pipe r stiffPIs
IheXpress LaheyCornpUer LlMS LoiPlot bOririg 199 MocleICAPi MoDIMIS PASGE
pfaht CAb SESbIL SLOPE SbbA STMt StratgraphicS SQRJ ER Systat TGRAF
D SoftwClre lVIinneClPolis al1d F software Hibbing 6 hour
ACAO ACAD Ll CADOVerlay Eagle Pqint MicroStatioi1 PC Probelt Siteworks
I Software 20 hour
PASCE Plant Schema PASCE PlarltVie1N
J Software 40 hou r
JK Simnlet
T Software 25 h6ur
Digitiiing ndVideo Equipment
General use software isnot urcharged
ODMA PCOOCS DOCS2478251
214
APPENDIX A
FEASIBILITY REPORT OUTLINE
I THE REPORT SHALL CONTAIN ALL THE INFORMATION OPINIONS
AND CONCLUSIONS REQUIRED BY MINN STAT 429 031
II COVER
A Project Number
B Brief Project Description and Location
C Date
D Engineering Firm Preparing Report
E Professional Engineer s Certification
III REPORT
A Project History
1 Feasibility Report Initiation
a Petitions Received
b Dates of City Council Action
2 Previous Reports with Estimated Costs
a Assessment in Software
b Environmental Issues
c Traffic
3 Previous Action
B Description of Construction Elements
1 Sanitary Sewer
2 Watermain
3 Storm Sewer
4 Streets
5 Street Lighting
A I
215
6 Other
7 Etc
a Alternates for Each Element
b Details Unique to the Project
I Constraints
2 Effects on Overall Systems
3 Alternatives
C Maintenance Impact
1 Unusual Maintenance Requirements
2 Operations and Maintenance Cost of Alternates
D General Estimated Costs
I Breakdown of Each Element project to time of construction
a Sanitary
b Watermain
c Etc
E Right of Way and Easements
1 General Description of Possible Easements
2 Cost Estimates for Easements
F Financing
1 Special Assessments
2 State Aid
3 County Aid
4 Effects on City Accounts
a Sanitary Sewer Trunk Account
b Water Trunk Source and Storage Accounts
G Projected Timetable
1 Public Hearing
2 Plans and Specifications
A 2
216
3 Advertising Requirements
4 Bid Receipt Date
5 Anticipated Construction Schedule
6 Anticipated Assessment Date
H Non Petitioning Properties Affected
1 Estimated Assessments
1 Rates
2 Maps and Drawings Showing Benefited Areas
3 Legal Descriptions of Benefited Area as Required by State Statute
for Public Hearing Notice
4 Preparation of Preliminary Assessment Roll
5 Assessment Analysis for Typical Property
J Controversial Aspects
1 Unusually High Assessment Rates
2 BuildableNon buildable Property Involved
3 Percentage PetitionedINon petitioned
K Conclusion
1 Statement
L Recommendations
A 3
217
APPENDIX B
DUTIES RESPONSIBILITIES AND LIMITATIONS OF
AUTHORITY OF THE RESIDENT PROJECT REPRESENTATIVE
ENGINEER shall furnish a Resident Project Representative RPR assistants
and other field staff to assist ENGINEER in monitoring performance of the work of
Contractor s
Through more extensive on site observations of the work in progress and field
checks of materials and equipment by the RPR and assistants ENGINEER shall provide
further protection for OWNER against defects and deficiencies in the work of
Contractor s but the furnishing of such services will not make ENGINEER responsible
for or give ENGINEER control over construction means methods techniques
sequences or procedures or for safety precautions or programs or responsibility for
Contractor s failure to perform the work in accordance with the Contract Documents
and in particular the specific limitations set forth in paragraph 1 6 of the Agreement are
applicable
The duties and responsibilities of the RPR are limited to those of ENGINEER in
ENGINEER S agreement with the OWNER and in the construction Contract Documents
and are further limited and described as follows
A GENERAL
RPR is ENGINEER S agent at the site will act as directed by and under the
supervision of ENGINEER and will confer with ENGINEER regarding RPR s actions
RPR s dealings in matters pertaining to the on site work shall in general be with
ENGINEER and Contractor s keeping OWNER advised as necessary RPR s dealings
with subcontractors shall only be through or with the full knowledge and approval of
Contractor s RPR shall generally communicate with OWNER with the knowledge of
and under the direction of ENGINEER
B DUTIES AND RESPONSIBILITIES OF RPR
1 Schedules Review the progress schedule schedule of Shop Drawing
submittals and schedule of values prepared by Contractor s and consult
with ENGINEER concerning acceptability
B 1
218
2 Conferences and Meetings Attend meetings with Contractor s such as
pre construction conferences progress meetings job conferences and other
Project related meetings and prepare and circulate copies of minutes
thereof
3 Liaison
a Serve as ENGINEER S liaison with Contractor s working
principally through Contractor s superintendent and assist in
understanding the intent of the Contract Documents and assist
ENGINEER in serving as OWNER S liaison with Contractor s
when Contractor s operations affect OWNER S on site operations
b Assist in obtaining from OWNER additional details or information
when required for proper execution of the work
4 Shop Drawings and Samples
a Record date of receipt of Shop Drawings and samples
b Receive samples which are furnished at the site by Contractor s
and notify ENGINEER of availability of samples for examination
c Advise ENGINEER and Contractor s of the commencement of any
work requiring a Shop Drawing or sample if the submittal has not
been approved by ENGINEER
5 Review of Work Rejection of Defective Work Inspections and Tests
a Conduct on site observations of the work in progress to assist
ENGINEER in determining if the work is in general proceeding in
accordance with the Contract Documents
b Report to ENGINEER whenever RPR believes that any work is
unsatisfactory faulty or defective or does not conform to the
Contract Documents or has been damaged or does not meet the
requirements of any inspection test or approval required to be made
and advise ENGINEER of work that RPR believes should be
corrected or rejected or should be uncovered for observation or
requires special testing inspection or approval
B 2
219
c Verify that tests equipment and systems start ups and operating and
maintenance training are conducted in the presence of appropriate
personnel and that Contractor s maintain adequate records thereof
and observe record and report to ENGINEER appropriate details
relative to the test procedures and start ups
d Accompany visiting inspectors representing public or other agencies
having jurisdiction over the Project record the results of these
inspections and report to ENGINEER
6 Interpretation of Contract Documents Report to ENGINEER when
clarifications and interpretations of the Contract Documents are needed and
transmit to Contractor s clarifications and interpretations as issued by
ENGINEER
7 Modifications Consider and evaluate Contractor s suggestions for
modifications in Drawings or Specifications and report with RPR s
recommendations to ENGINEER Transmit to Contractor s decisions as
issued by ENGINEER
8 Records
a Maintain at the job site orderly files for correspondence reports of
job conferences Shop Drawings and samples reproductions of
original Contract Documents including all Work Directive Changes
Addenda Change Orders Field Orders additional Drawings issued
subsequent to the execution of the Contract ENGINEER S
clarifications and interpretations of the Contract Documents
progress reports and other Project related documents
b Keep a diary or log book recording Contractor s hours on the job
site weather conditions data relative to questions of Work Directive
Changes Change Orders or changed conditions list of job site
visitors daily activities decisions observations in general and
specific observations in more detail as in the case of observing test
procedures and send copies to ENGINEER
c Record names addresses and telephone numbers of all
Contractor s subcontractors and major suppliers of materials and
equipment
9 Reports
B 3
220
a Furnish ENGINEER periodic reports as required of progress of the
work and of Contractor s compliance with the progress schedule
and schedule of Shop Drawing and sample submittals
b Consult with ENGINEER in advance of scheduled major tests
inspections or start of important phases of the work
c Draft proposed Change Orders and Work Directive Changes
obtaining backup material from Contractor s and recommend to
ENGINEER Change Orders Work Directive Changes and Field
Orders
d Report immediately to ENGINEER and OWNER upon the
occurrence of any accident
10 Payment Requests Review applications for payment with Contractor s for
compliance with the established procedure for their submission and forward
with recommendations to ENGINEER noting particularly the relationship
of the payment requested to the schedule of values work completed and
materials and equipment delivered at the site but not incorporated in the
work
11 Certificates Maintenance and Operation Manuals During the course of the
work verify that certificates maintenance and operation manuals and other
data required to be assembled and furnished by Contractor s are applicable
to the items actually installed and in accordance with the Contract
Documents and have this material delivered to ENGINEER for review and
forwarding to OWNER prior to final payment for the work
12 Completion
a Before ENGINEER issues a Certificate of Substantial Completion
submit to Contractor s a list of items requiring completion or
correction
b Conduct final inspection in the company of ENGINEER OWNER
and Contractor s and prepare a final list of items to be completed or
corrected
c Observe that all items on final list have been completed or corrected
and make recommendations to ENGINEER concerning acceptance
B 4
221
C LIMITATIONS OF AUTHORITY
Resident Project Representative
1 Shall not authorize any deviation from the Contract Documents or
substitution of materials or equipment unless authorized by ENGINEER
2 Shall not exceed limitations of ENGINEER S authority as set forth in the
Agreement or the Contract Documents
3 Shall not undertake any of the responsibilities of Contractor s
subcontractors or Contractor s superintendent
4 Shall not advise on issue directions relative to or assume control over any
aspect of the means methods techniques sequences or procedures of
construction unless such advice or directions are specifically required by
the Contract Documents
5 Shall not advise on issue directions regarding or assume control over safety
precautions and programs in connection with the work
6 Shall not accept Shop Drawing or sample submittals from anyone other
than Contractor s
7 Shall not authorize OWNER to occupy the Project in whole or in part
8 Shall not participate in specialized field or laboratory tests or inspections
conducted by others except as specifically authorized by ENGINEER
B 5
222
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952227 1180
Fax 9522271190
Engineering
Phone 952227 1160
Fax 952227 1170
Finance
Phone 952227 1140
Fax 952 2271110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952227 1110
Web Site
WINI ci chan hassen m n us
ieL
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Jill Sinclair Environmental Resources Specialist
DA TE November 26 2007 o1tt
SUBJ 2007 Environmental Excellence Awards
REQUESTED ACTION Simple majority vote of the City Council
Authorize the presentation of 2007 Environmental Excellence Awards to the
following award winners on December 10 2007
Dale Rusch
Eckankar
General Mills
DISCUSSION
Environmental Excellence Awards are given by the City of Chanhassen to
recognize environmental improvements and encourage environmental stewardship
throughout the community These awards are designed not only to recognize
achievement but also to communicate new ideas and help educate the members
of the Chanhassen community For 2007 three nominees have been
recommended by the Commission
Dale Rusch has voluntarily monitored bluebird houses at Lake Ann Park near his
home and along Coulter Blvd for the past couple of years On his own time he
has kept record of how many boxes were used what species nested how many
eggs were laid and the number of fledglings produced His commitment to the
project aids Chanhassen s natural community and provides residents with the
excitement and appreciation of seeing bluebirds in our parks and greater
community Dale Rusch was nominated by the Environmental Commission
For decades Eckankar has been committed to the stewardship of their natural
resources Their acres hardwood forest and restored prairie are an important
component of their campus and require an annual commitment of time and
resources in order to preserve this sustainable landscape They are actively
managing their natural resources by monitoring for and removing diseased trees
The City 01 Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play223
and invasive species planting trees and maintaining their prairie areas Eckankar
was nominated by the Environmental Commission
General Mills annually coordinates an Earth Day event for its employees All
employees and their families are invited to participate in a service project that
helps the environment and is fun for the whole family In the past they have done
tree planting storm drain marking and adopt a highway cleanups On May 12
nearly 70 volunteers from General Mills arrived early in the morning at Lake Ann
Park to take part in a planting project for the park s rain gardens The volunteers
planted trees shrubs grasses and flowers nearly 1 000 plants in total General
Mills was nominated by the Environmental Commission
The award presentation is scheduled for the December 10 City Council meeting
RECOMMENDA TION
The Environmental Commission recommends the following awards for the
recipients
Chan Bucks Dale Rusch
Plaque Eckankar
Plaque General Mills
g planjs ec projects ee award ee award memo 07 doc
224
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952227 1160
Fax 952 227 1170
Finance
Phone 952 2271 140
Fax 952227 1110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952227 1125
Fax 952 227 1110
Web Site
WIVW ci chanhassen mn us
J e
11
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Bob Generous Senior Planner
DATE November 26 2007
SUBJ Lakeside PUD Amendment Planning Case 07 23
EXECUTIVE SUMMARY
The applicant is requesting an amendment to the Development Design Standards
for Lakeside Planned Unit Development to allow a IS foot rather than a 20 foot
separation between the townhouse units and to adjust the wetland setback
consistent with current wetland setback requirements No additional dwelling
units are being proposed nor will the change substantially alter the approved site
plan
ACTION REQillRED
City Council approval requires a majority of City Council present
PLANNING COMMISSION SUMMARY
The Planning Commission held a public hearing on November 6 2007 The
Planning Commission voted six for and one against a motion recommending
approval of the PUD design standard amendment
Commissioner Keefe in his vote against the amendment raised two issues Staff is
responding in an issues response format
Issue
Hard surface coverage
We still don t know whether the 50 hard surface coverage requirement allowed
under the PUD will be met for this development I don t suspect the amendment
variance will affect the outcome of this question But it is important to limit the
development to this standard prior to the completion of the project
A lot of latitude has been given to this developer in the form of relaxation of
zoning standards I am concerned general market and economic pressures on this
particular developer may cause them to cut comers on this development The
City may not get the level of design it sought in exchange for relaxation of
The City 01 Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play225
Todd Gerhardt
November 26 2007
Page 2
standards It may also not get any condo building as financing for these types of projects is
virtually non existent This should be monitored closely It doesn t appear that monitoring is
happening as we still don t yet know whether the plans meet the 50 hard surface coverage
requirement and construction is well underway
Response
Is the development exceeding the impervious surface coverage Maximum site coverage is 50
percent over the entire development Following is the breakdown of site coverage for Lakeside
Total Site Area
Right of Way
2629 acres
174 acres
Net Development Area 24 55 acres
Impervious Surfaces
Drives and Sidewalks
Twin Units
Townhouse Units
Condominiums
Pool Building
4 09 acres
2 58 acres
1 84 acres
237 acres
0 15 acres
Total Impervious Surface 1103 acres
Site Coverage is calculated by dividing the total impervious surface by the net development area
11 0324 55 45 percent The 45 percent site coverage is less than the 50 percent coverage
permitted by the PUD
Issue
Variance or Amendment
The change in the PUD was brought forth as an amendment to the PUD It should have been
brought forth as a variance to the wetland buffer and buffer setback The difference is subtle
however variances require meeting hardship requirements I don t believe hardship
requirements would be met with this request And we wouldn t know unless the case is brought
forth correctly
Side setbacks
The amendment variance has the affect of narrowing the space between buildings Although
the IS foot separation is the same as townhomes in the same development I am concerned we
have a consistency issue for building spacing as compared to other zoning classifications I
226
Todd Gerhardt
November 26 2007
Page 3
understand in PUDs we make offsets in exchange for higher design standards It is still a
concern and deserves attention
Response
The setback to the wetlands simply reiterated the wetland setback of City Code in place at the time
of initial project approval The proposed amendment is consistent with the City Code which was
amended If we deleted the wetland setback standard included in the PUD and required compliance
with the wetland standards in the City Code we would be following these new wetland standards
Section 20 508 of the PUD standards in City Code only address setback requirements from the
perimeter of the project to structures within the project and from public streets Other setbacks are
established by the PUD agreement Interior setbacks are not addressed but are developed in
conjunction with the individual development plans Usually within a PUD interior lot line setbacks
are zero In this instance the setback is established between buildings not to the lot line The
setbacks between structures are generally a function of building and fire codes Building and fire
codes address the required fire separation between structures and between a structure and the
property line With greater fire rating and protection the structures may be closer to the property
line or to other structures The Lakeside PUD standard currently has a IS foot separation
requirement for the twin homes Approval of the revision would make the required separation
between the attached units twin and townhouses the same throughout the development
The setback to the wetlands simply reiterated the wetland setback of City Code in place at the time
of initial project approval The proposed amendment is consistent with the City Code which was
amended If we deleted the wetland setback standard included in the PUD and required compliance
with the wetland standards in the City Code we would be following these new wetland standards
In both instances these are changes in the standards rather than requesting a variance from the
standard Therefore an amendment to the PUD is appropriate
RECOMMENDATION
Staff recommends adoption of the motion as specified on page 8 in the staff report dated
November 6 2007 approving the amendment to the PUD standards for Lakeside
ATTACHMENTS
1 Reduction of the Cover Sheet for Lakeside at Bearpath
2 Ordinance Amending the PUD Design Standards
3 Planning Commission Staff Report dated November 6 2007
g plan2007 planning cases 07 23 lakeside pud amendment executive summary doc
227
uTu ul
1 I I 1IEIJll004e
gl
n i I l5nrYrlihu
J
t e
I
D O
aID
2
w
m
IE t ie0w
UJ
W UJ
cgJIEIn2DWc
J
u
J
l
e
I
D
l Jijj lW 11 IIIO5m2m
1 3 WZZ J NAaO599557 w
m 5 o cdOO58b88SgegguI c
l hjodcJ Miiilijl mI IIjL18effieimue5
I QOcnJrnfj1454ifoms
w I o 58l8d8810U
Z Zg5geeeQgggggglQ
J
3if
td
fffoa
c
b
m
N
f
0 J
Q
4
jh
a
j
lItIU
It
i
I
I
I
I
I
I
I
I
f f
I
I
I
I
t
i
I
Ib i
obOi Y f
1l1f
istalnv
c R oV NOsoiAlJI
c w t 1
dB
88
l Zzz
Q
f5f5 Q
M515dffi
lHj H g
Di02 gHaaaa o8Bgggol7
r4J rlJirdrcioiiJ
li f
6 oiSjGUli5iiiZ
Jl n
3 i iHlitlJaiI1tIi
e U ho wi55Iejj8Sf
ll P16hoililc
i liljlas5fljs11iIliESjHiSMj
t a
5 1i
ej
a
r I
n
i I I
i
I t Ildi
1E I
i J1118I1 iiIIIPtllH
L I
r
tE8 iil13
I f o A1i8ig
I a ei
Ul I
1
is
1
g
i
zS
a
8 t
z o
1
8
1
IH
I
a2j6
lillIIl
I
f iflflit
5
il
l
I 11
lil U
i 0
P I t
p
I nsiHli
228
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
ORDINANCE NO
AN ORDINANCE AMENDING CHAPTER 20 OF THE
CHANHASSEN CITY CODE THE CITY S ZONING ORDINANCE
BY AMENDING A PLANNED UNIT DEVELOPMENT
THE CITY COUNCIL OF THE CITY OF CHANHASSEN ORDAINS
Section 1 Chapter 20 of the Chanhassen City Code the City s zoning ordinance is hereby
amended by amending the Lakeside Planned Unit Development Design Standards Section c
Setbacks as follows
c Setbacks
The PUD ordinance requires setbacks from roadways and exterior property lines The following
table displays those setbacks
Setback Standards
Highway 212 50 feet
East Perimeter Lot Line 50 feet townhouses twin
homes
Building Height of the
Condominiums with a
minimum of 30 feet
Lyman Boulevard 50 feet 30 feet for beach lot
West Perimeter Lot Line 50 feet
Twin Home separation between buildings 15 feet
Townhouse separation between buildings 15 feet
Minimum Driveway length to back of curb trail or sidewalk 25 feet
Hard Surface Coverage 50
Wetland Buffer and buffer setback 20 feet and 30 feet
Lake Riley 75 feet
Decks patios porches and stoops may project up to seven 7 feet in to the required yard
The entire development including the public and private streets and Outlots may not exceed 50
percent hard coverage Individual lots will exceed the 50 percent site coverage
Section 2 This ordinance shall be effective immediately upon its passage and publication
PASSED AND ADOPTED by the Chanhassen City Council this 26th day of November
2007
1
229
ATIEST
Todd Gerhardt ClerkManager Thomas A Furlong Mayor
Published in the Chanhassen Villager on 2007
g plan2006 planning cases 06 26 Lakeside pud amendment ordinance doc
2
230
z
u
rL1
PC DATE 116 07
CC DATE 1126 07
CITY OF CHANHASSEN REVIEW DEADLINE December 30 2007
CASE 07 23
BY AF RG ML JM
STAFF REPORT
PROPOSAL Request for Minor PUD Amendment to adjust internal setback requirements from 20 feet to
15 feet and adjust the wetland setback consistent with current wetland setback requirements
LOCATION Northwest comer of Lyman Boulevard and Lakeview Road East
APPLICANT Sienna Corporation
Attn John Vogelbacker
4940 Viking Drive 608
Minneapolis MN 55435
952 994 2646
jvogelbacher@siennacorp com
o
PRESENT ZONING Planned Unit Development Residential PUD R
2020 LAND USE PLAN Residential High Density
ACREAGE 263 acres DENSITY Not Applicable
SUMMARY OF REQUEST The developer is proposing an amendment to the Development Design
Standards to allow a 15 foot side yard setback between the townhouse units within the project
LEVEL OF CITY DISCRETION IN DECISION MAKING
The City has arelatively high level of discretion in approving amendments to PUD s because the City is
acting in its legislative or policy making capacity A PUD amendment must be consistent with the
City s Comprehensive Plan
nCAUtIED231
Lakeside PUD Amendment
Planning Case 2007 23
November 6 2007
Page 2 of8
PROPOSAL SUMMARY
The applicant is requesting an amendment to the Development Design Standards for Lakeside to
allow a IS foot rather than a 20 foot separation between the townhouse units and adjust the wetland
setback consistent with current wetland setback requirements No additional dwelling units are
being proposed nor will the change substantially alter the approved site plan The net result is
shown in the preliminary site plan for Lakeside below
uand
n
n n lu I i JliOT
I
r 4 4 4 4 4 4 f v IlO
III I 1 IXIIrrfrIr14
I fq fOj v
f 1 I II I I I I JljIIIIIIIIV
v J 4 4 4 4 4 4 4 tti KJy
Y
The proposed amendment which would permit the development as originally proposed and which
was found consistent with the City ofChanhassen Comprehensive Plan is therefore consistent
with the Comprehensive Plan
Throughout the development review approval process the concentration ofthe developer was on
the issue related to the impacts ofthe development on the eastern side ofthe project adjacent to
Bearpath golf course Originally the developer had requested avariance to permit a 30 foot setback
for the twin homes to the eastern project boundary However this variance was denied The
developer did not review the implications ofthe townhouse separation requirement relative to the
wetland setback By amending the setback between townhouses the developer will be able to
comply with the required wetland setback
A revised grading plan depicting the IS foot setback must be submitted Staff does not anticipate
any grading or drainage issues associated with the setback modification
232
Lakeside PUD Amendment
Planning Case 2007 23
November 6 2007
Page 3 of8
There are no public utilities between these buildings The developer is responsible for ensuring that
any private utility between the building pads affected by the reduced setback are relocated
accordingly
There are no apparent building code issues with this proposed PUD amendment It should be
noted however that building walls within five 5 feet of a property line must be of one hour
fire resistive construction The development already has this setback standard for the twin
homes within Lakeside
Staffis recommending approval of the amendment to the Lakeside Development Design Standards
APPLICABLE REGUATIONS
Chapter 20 Article 2 Division 2 Amendments
Lakeside Design Standards
BACKGROUND
On August 13 2007 the Chanhassen City Council approved the Final Plat for Lakeside Third
Addition creating five outlots Two outlots will be further developed C and E which must be
submitted for final platting with lots and blocks prior to development The remaining outlots A
B and D will be common open space
On January 8 2007 the Chanhassen City Council approved the Final Plat for Lakeside Second
Addition creating 39 lots and 3 outlots The second phase of Lakeside consisted of41 lots and 1
outlot Seven of the lots were for Wooddale Builders 32 ofthe lots were for Charles Cudd
Company 2 lots were for common open space and Outlot A was for future platting for building
sites
On October 23 2006 the Chanhassen City Council approved the Final Plat for Lakeside The
final plat approval for the first phase of Lakeside consisted of 18 lots 10 outlots and right of
way for public streets The first phase of the development included the community building and
storm water pond 11 lots for townhouses on the west side ofthe development Wooddale
Builders Inc 4 lots for twin homes on the east side ofthe development Charles Cudd
Company Outlot A which will contain the private street and utilities for the project and Outlots
I and J the recreational beach lot site The balance ofthe outlots will be platted in the future for
additional residential development The developer performed all the subdivision improvements
as part of the original plat
On July 24 2006 the Chanhassen City Council approved the following
A Rezoning of the property located within the Lakeside development from High Density
Residential District RI2 to Planned Unit Development Residential PUD R
incorporating the development design standards contained within the staff report subject
to the final plat approval for the Lakeside development
233
Lakeside PUD Amendment
Planning Case 2007 23
November 6 2007
Page 4 of8
B Preliminary Plat for Lakeside
C Site Plan for 231 housing units and a community building with pool with a Variance for
building height for the condominium units consistent with the Building elevations prepared
by Harriss Architects
D Conditional Use Permit for a recreational beach lot with a Variance from the
requirement that 80 percent of the units be within 1 000 feet of the recreational beach lot
Throughout the development review process the City provided the developer with wetland
requirements The following information was included in the staff report for the subdivision
WETLANDS
The wetland delineation for the subject site showed two wetland basins on site The applicant
applied for wetland exemptions on December 22 2005 for both Wetland Basins A in the
southwest comer of the development and B in the northwest comer of the development On
January 10 2006 the City of Chanhassen issued an exemption decision for Wetland Basin A a
0 03 acre Type 3 wetland basin on the Lakeview Hills site An incidental wetland exemption
was issued for Wetland Basin A because the basin was found to be a constructed basin to
maintain the drainage through the culvert under the historical driveway to Lakeview Hills and
previous farm field
City staff reviewed the as built plans of record and determined that the structure near Wetland
Basin B in the northwest comer of the development was an inlet and therefore was not
contributing to the hydrology ofthe wetland Review of the HIG photographs submitted and
Farm Service Agency FSA photographs at the Carver Soil and Water Conservation District
revealed that the wetland area existed prior to the construction of the apartment complex 1963
HIG Photo The berm on the south side ofthe wetland allowed the City to rule out the
possibility that storm water from the complex was being directed into Wetland Basin B The
berm on the north side ofthe wetland appears to have formed in the early 1970s with the
excavation ofpart of Wetland Basin B to open water In examining the photos it appears the
ditch to the north of the property stopped functioning between 1951 and 1957 about the time the
wetland signatures in the photos become visible Wetland Basin B has been in existence for
more than 25 years and is therefore jurisdictional wetland that cannot be considered for
incidental or drainage exemptions City staff concluded that Wetland Basin B was not eligible
for incidental or drainage exemptions The application for an exemption for Wetland Basin B
was denied on January 10 2006
Wetland Basin B is a 0 75 acre Type 3 aglurban wetland in the northwest comer of the site
The wetland is dominated by sedges reed canary grass willow red osier dogwood and quaking
aspen
The City on May 14 2007 amended the wetland protection ordinance to adopt revised
standards for wetland classification and setback requirements The wetland classification for the
wetland located in the northwest comer of the development is a Manage 2 A minimum buffer of
234
Lakeside PUD Amendment
Planning Case 2007 23
November 6 2007
Page 5 of8
20 feet should be preserved around the perimeter of the wetland All structures including
parking lots should maintain a 30 foot setback from the wetland buffer
The plans have been revised to reflect the required wetland buffer and wetland buffer setback
Wetland buffer areas should be preserved surveyed and staked in accordance with the City s
wetland ordinance The applicant should install wetland buffer edge signs before construction
begins and must pay the City 20 per sign
A minimum buffer of 20 feet shall be preserved around the perimeter of the wetland All
structures including parking lots shall maintain a 30 foot setback from the wetland buffer All
trails and retaining walls shall be modified to remain outside the wetland buffer Wetland buffer
areas shall be preserved surveyed and staked in accordance with the City s wetland ordinance
The applicant shall install wetland buffer edge signs before construction begins and shall pay the
City 20 per sign
REZONING
Changes to design standards are similar to an amendment to zoning district standards since the
PUD is the zoning of the property
DEVELOPMENT DESIGN STANDARDS
Lakeside Development Standards
a Intent
The purpose ofthis zone is to create a PUD for a mix housing type multi family development
The use of the PUD zone is to allow for more flexible design standards while creating a higher
quality and more sensitive proposal The PUD requires that the development demonstrate a
higher quality of architectural standards and site design Ancillary uses may be permitted as
listed below once a primary use has occupied the site
b Permitted Uses
The permitted uses in this zone shall be twin homes townhouses and three condominium
buildings and their ancillary uses If there is a question as to whether or not a use meets the
definition the Planning Director shall make that interpretation The type ofuses to be provided
on common areas shall be low intensity neighborhood oriented accessory structures to meet
daily needs ofresidents Such uses may include a bus shelter community building development
signage fountain garden gazebo maintenance shed picnic shelter pool playground equipment
or tennis courts
235
Lakeside PUD Amendment
Planning Case 2007 23
November 6 2007
Page 6 of8
c Setbacks
The PUD ordinance requires setbacks from roadways and exterior property lines The following
table displays those setbacks
Setback Standards
Highway 212 50 feet
East Perimeter Lot Line 50 feet townhouses twin
homes
Building Height
Condominiums with a
minimum of 30 feet
Lyman Boulevard 50 feet 30 feet for beach lot
West Perimeter Lot Line 50 feet
Twin Home separation between buildings 15 feet
Townhouse separation between buildings 20 feet
Minimum Driveway length to back of curb trail or sidewalk 25 feet
Hard Surface Coverage 50
Wetland Buffer and buffer setback 16 5 feet and 40 feet
Lake Riley 75 feet
Decks patios porches and stoops may project up to seven 7 feet in to the required yard
The entire development including the public and private streets and Outlots may not exceed
50 percent hard coverage Individual lots will exceed the 50 percent site coverage
d Building Materials and Design
1 Townhouses
Building height shall be limited to 35 feet
Building exterior material shall be a combination of fiber cement or vinyl siding
or shake and brick or stone
No two adjacent structures shall be ofthe same color scheme
Colors used shall be varied across color tones
All units shall utilize minimum timberline 30 year asphalt shingles
Each unit shall have a minimum of one overstory tree within its front landscape
yard
All mechanical equipment shall be screened with material compatible to the
building landscaping or decorative fencing
Garage doors shall be decorative and have windows
2 Community Clubhouse
Building height shall be limited to 35 feet
Building exterior material shall be a combination of stone and stucco and fiber
cement
236
Lakeside PUD Amendment
Planning Case 2007 23
November 6 2007
Page 7 of8
Natural cedar shakes roofing
3 Condominium Building
Building height shall be limited to 48 feet
Building exterior material shall be a combination of 80 percent or greater stone
and brick Accent and trim areas in fiber cement lap siding and shake
Roofing shall be a minimum timberline 30 year asphalt shingles pitched roofs
e Signage
Signage shall comply with city standards for Residential Districts
f Landscaping
Landscaping shall comply with the landscaping plan prepared by Pioneer Engineering
dated May 19 2006 revised June 7 2006
AMENDMENT
Highlighted below changes are shown in bold and strikethrough format is the proposed change to
the development design standard
c Setbacks
The PUD ordinance requires setbacks from roadways and exterior property lines The following
table displays those setbacks
Setback Standards
Highway 212 50 feet
East Perimeter Lot Line 50 feet townhouses twin
homes
Building Height
Condominiums with a
minimum of30 feet
Lyman Boulevard 50 feet 30 feet for beach lot
West Perimeter Lot Line 50 feet
Twin Home separation between buildings 15 feet
Townhouse separation between buildings W 15 feet
Minimum Driveway length to back of curb trail or sidewalk 25 feet
Hard Surface Coverage 50
Wetland Buffer and buffer setback 20 feet and 4 30 feet
Lake Riley 75 feet
Decks patios porches and stoops may project up to seven 7 feet in to the required yard
The entire development including the public and private streets and Outlots may not exceed
50 percent hard coverage Individual lots will exceed the 50 percent site coverage
237
Lakeside PUD Amendment
Planning Case 2007 23
November 6 2007
Page 8 of 8
RECOMMENDA TION
Staff and the Planning Commission recommends that tfl0 City Council PlaNNiNg C0mmi88ilN
adopt the following motion adopt the attached findings of fact and recommendation and require
that a revised grading plan depicting the 15 foot setback be submitted
The Chanhassen PlaNNiNg C0mmi88iElR re80mm0N8S tRg City Council approves the amendment
to the Planned Unit Development PUD 06 26 development design standards section c Setbacks
to read as follows
c Setbacks
The PUD ordinance requires setbacks from roadways and exterior property lines The following
table displays those setbacks
Setback Standards
Highway 212 50 feet
East Perimeter Lot Line 50 feet townhouses twin
homes
Building Height
Condominiums with a
minimum of 30 feet
Lyman Boulevard 50 feet 30 feet for beach lot
West Perimeter Lot Line 50 feet
Twin Home separation between buildings 15 feet
Townhouse separation between buildings 15 feet
Minimum Driveway length to back of curb trail or sidewalk 25 feet
Hard Surface Coverage 50
Wetland Buffer and buffer setback 20 feet and 30 feet
Lake Riley 75 feet
Decks patios porches and stoops may project up to seven 7 feet in to the required yard
The entire development including the public and private streets and Outlots may not exceed
50 percent hard coverage Individual lots will exceed the 50 percent site coverage
ATTACHMENTS
1 Findings of Fact and Recommendation
2 Development Review Application
3 Reduced Copy Preliminary Site Plan
4 Reduced Copy Proposed Lakeside Fourth Addition Plat Exhibit
5 Hearing Affidavit Public Hearing Notice and Mailing List
g plan2007 planning cases 07 23 lakeside pud amendmentstaff report lakeside pud amendment doc
238
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
INRE
Application of Sienna Corporation for an amendment to the Planned Unit Development Design
Standards
OnNovember 6 2007 the Chanhassen Planning Commission met at its regularly
scheduled meeting to consider the application of Sienna Corporation for an amendment to the
Planned Unit Development Design Standards to allow a IS foot setback between townhouses and
adjust the wetland setback consistent with current wetland setback requirements The Planning
Commission conducted a public hearing on the proposed Planned Unit Development preceded by
published and mailed notice The Planning Commission heard testimony from all interested
persons wishing to speak and now makes the following
FINDINGS OF FACT
1 The property is currently zoned Planned Unit Development Residential PUD R
2 The property is guided in the Land Use Plan for Residential High Density
3 The legal description of the property is Lakeside Carver County Minnesota
4 The Zoning Ordinance directs the Planning Commission to consider six 6 possible
adverse affects of the proposed amendment The six 6 affects and our findings
regarding them are
a The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City
Comprehensive Plan
b The proposed use is or will be compatible with the present and future land uses of
the area
c The proposed use conforms with all performance standards contained in the
Zoning Ordinance with the granting of the variances outlined in the staff report
d The proposed use will not tend to or actually depreciate the area in which it is
proposed
e The proposed use can be accommodated with existing public services and will not
overburden the city s service capacity
1
239
f Traffic generation by the proposed use is within capabilities of streets serving the
property
5 The planning report 07 23 dated November 6 2007 prepared by Robert Generous et aI
is incorporated herein
RECOMMENDA TION
The Planning Commission recommends that the City Council approve the amendment to
the Planned Unit Development Design Standard section c to allow a 15 foot setback between
townhouses and adjust the wetland setback consistent with current wetland setback requirements
ADOPTED by the Chanhassen Planning Commission this 6th day ofNovember 2007
CHANHASSEN PLANNING COMMISSION
BY
Its Chairman
g plan2007 planning cases 07 23 lakeside pud amendmentfindings of fact doc
2
240
CITY OF CHANHASSEN
7700 Market Boulevard P O Box 147
Chanhassen MN 55317 952 227 1100
Planning Case No Of ct
e1V OF CHANHASSEN
RECEIVED
AUG 3 1 2007
DEVELOPMENT REVIEW APPLICATION CHANHASSEN PLANNING DE T
PLEASE PRINT
Applicant Name and Address
5JeVl Cor p
s u fc pc 6 4crlfu u k I crIirMpiMASS4
Contact oklo vocl blc k c v
Phone 4G z qq ZG tb Fax 952 s 3 7DD8
Email Jvu 1c Ioocker @ ie cco c O
Owner Name and Address
Contact
Phone
Email
Fax
NOTE Consultation with City staff is required prior to submittal including review of development
plans
Comprehensive Plan Amendment Temporary Sales Permit
Conditional Use Permit CUP Vacation of Right of Way Easements VAC
Interim Use Permit IUP Variance VAR
Non conforming Use Permit Wetland Alteration Permit WAP
y Planned Unit Development 11i oj
n It
A Nt e teA Zoning Appeal
Rezoning Zoning Ordinance Amendment
Sign Permits
Sign Plan Review
X Notification Sign 200
City to install and remove
Site Plan Review SPR
X Escrow for Filing Fees Attorney Cost
50 CUP SPRNACNARIWAP Metes Bounds
450 Minor SUB
TOTAL FEE It 350 02Subdivision
An additional fee of 3 00 per address within the public hearing notification area will be invoiced to the applicant
prior to the public hearing
Sixteen 16 full size folded copies of the plans must be submitted including an 8 X 11
reduced copy for each plan sheet along with a diQital copy in TIFF Group 4 tif format
Escrow will be required for other applications through the development contract
Building material samples must be submitted with site plan reviews
NOTE When multiple applications are processed the appropriate fee shall be charged for
each application
SCANNED241
LOCATION L k
L cc 4 8 e
12 ej
L4 L s L 4 kc sve 2 4 Aerl o L4 Sl
PROJECT NAME
LEGAL DESCRIPTION
1 f A tdvt t
TOTAL ACREAGE 2 c
PRESENT ZONING
X YES
eU 1J
NOWETLANDSPRESENT
REQUESTED ZONING Pu iJ
PRESENT LAND USE DESIGNATION
REQUESTED LAND USE DESIGNATION
REASON FOR REQUEST ClI
u 0 ivt e I4L 0 Pur
c II c cv
I
C C v S e b Co c
C e V ujA c L o 010
a f Lc OJ 1
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions Before filing this application you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application
A determination of completeness of the application shall be made within 15 business days of application submittal A written
notice of application deficiencies shall be mailed to the applicant within 15 business days of application
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application I have attached a copy of proof of ownership
either copy of Owner s Duplicate Certificate of Title Abstract of Title or purchase agreement or I am the authorized person
to make this application and the fee owner has also signed this application
I will keep myself informed of the deadlines for submission of material and the progress of this application I further
understand that additional fees may be charged for consulting fees feasibility studies etc with an estimate prior to any
authorization to proceed with the study The documents and information I have submitted are true and correct to the best of
my knowl4
ignature of Appli
r Sep
b 07
Dat
15 610
ifate SCANNED
G pLAN formsDevelopment Review Application DOC Rev 12 05242
z
0
Iisvic
w
z
z
ct
Ul
Z
0
rigii8
en
en
I
h
1
c
o
III
l
d
HIlilhIfIllIflfil
i
jII
I III
i iu
Iffidp
s l IiIIi
L f M111
243
r
J
I J
c 7
I c C I
I 1
I I
I L J C I
J I I
I
I
f
I
J
1 1 I
L v
c I I
I
i
i i
I
I
I L j
I
r
7 I
I CJ
I I
I
CJ I I
lU
I I
I
f I
I L j
I I
I C I I
CJ I I
1 LJ I
I
Cr 1
I U I I
I
I I
L
I I
r J
I
7 I
I
I
I
I
I
I f
I
f I
I
I
I
I
I
CJ I
I
CJ I
f
I
I
I
CJ I
I C I
I I
I I
L I
I
f
I L j
I
I
C
f
I
I
I
I V
I
I
L J
I
I
V
o
h
It
Q
Q
t3
o
a
I
o
0
o
g
f
CJ
C
CJ
G
L
f
L J
c
V
L J
L i 8b I
5Rg
rlJ
I
o
c
f
1
C
Il
3 ogl t6QN
CII
C
J
C l
f
1
1
1
1
1
I
I
I
I
I
I
1
I
1
1
1
1
1
1
1
1
lJ
I
2
I Jlz
t
I osg
I
I 51
l II
1 31 t
g
I 8
ii g
L
o
1
1
1
I
I
1
1
I f
n
1
1
1
1
1
1
I
1
1
I g
LIJl 1
zq
t e5a
I o
I ii
IonQ
1
1
1
1
1
1
1
I
I
I
I
I
1
I
I
1
1
1
I
I
1
1
1
1
1
I
I
1
I
1
1
1
I
1
1
I
I
I
I
I
I
I
I
I
1
I
OJ
5
I
S5
f
cS
c
CJ
7
co
L
f
Cr
5
f
cS
c
CJ
c
tr
1j
Lf
JcS
cii
i
0
oiJi
w
0
I l
is
Ow
OJ
W
c
w
CJ
en
J 1
u
i
w
o Ii
F
is
5
g jE
5 wo
j
m
3 t
g
ijj
o
e 1
1
i
i
j
l5 0 Cl
IF l
m
OCt
B 3
Ct Lo s
N
r I
I
0 1
l
lZl
IPg
244
CITY OF CHANHASSEN
AFFIDAVIT OF MAILING NOTICE
ST ATE OF MINNESOTA
ss
COUNTY OF CARVER
I Karen J Engelhardt being first duly sworn on oath deposes that she is and was on
October 25 2007 the duly qualified and acting Deputy Clerk of the City of Chanhassen
Minnesota that on said date she caused to be mailed a copy of the attached notice of Public
Hearing for Lakeside Minor PUD Amendment Planning Case 2007 23 to the persons
named on attached Exhibit A by enclosing a copy of said notice in an envelope addressed to
such owner and depositing the envelopes addressed to all such owners in the United States mail
with postage fully prepaid thereon that the names and addresses of such owners were those
appearing as such by the records of the County Treasurer Carver County Minnesota and by
other appropriate records
1LJr
Subscribed and sworn to before me
this day of o1Yr 2007
r J
JV I uJ
Notary blic
1J Jt KIM T MEUWISSEN
o Notary Public Minnesota
i My Commission Expires Jan 31 2010
245
m
m
E
Olt
C 0
U
UCO
Q Er
u E
0
00
JOlct
otmtu2c
OsZm
U
U
co
J
C
co
J
o
Ol
C
m
m
E
c
OlO
c U
UcomErE
0
00
JOl
c c
coc
Q co
u c
o c
zmU
U
co
J
C
co
J
o
Ol
s
0 t5
c ctlOCccQmcijctlE
OJ g
E ctl1 l
eaea EQ C
Q Q Q JOE
Co U5
I Q al c
Ej Og j
ot ctlOen
o jg ctl 0 C 0
a ctlC
aC EooaQ Q jgaE1
iof OltlcCTC
cnQ ogajE
CJ c j c
cD g E 0 J 0
c ctl J a 2
Q J L CJ 1 CcQOEEOO
E Q o g 0 Q gQofcenen
l Ow Q I SzoccO200Qow0
E U Q 0
ECl t57dctlenJIlctlJC
Q t c 5 9 QleaQQQJIUiOaen Cf
Cli
E
i
CI
ltl
C
c
o
ltl
U
o
I
ltl
11
o
0
o
c
8 CI
J
Q 8E OJ0entctlenQenQQltllll0lQlCEJocUUen5ctltljg5QctlaEctl0CI
Q l w1 e c3 0
U C 1 g CIOC0QctlQo
O en gE E
d EO O Q j 8 g u SQQEQCJQcenQngeoS0oSgEEenctl0QltlCI
CHI 0 0 2 C 0 8 Q t O ElcenOQoSlienoUCctl0ClenJQ
Q ctl @ 0 Q 11 0J0ClC
E oS c U J C 5 0 jjjiCCICC0200QU0CI11EoOoocQi0lQEEQ1EctlcQjosoIlEctlCIJ0oS2oQg0encClenenCUgnE
Q UOClQ 2 en Q ctll Q Cl OC1
C J Q en ctl 0 oc c 0
cO o Q Q li C cT ClOlClJouQESM ltlUalCloctlDcJ1octlajCI s
ti 0 ctl Cl Q g ftj r Q Q CI 0 coSQuQCctlECJJEC
a 0 lQ ctlen enuctlQ CJen o
Q Og ClClgE O Ec c
III E li Q J 00 ctl Q c Itl 0 CIjEoenctl1iEgcJEenmoc
c Q E Q gii oolwJ0lUOQEcECIJla022UILoSj0QC
gQ li5 Q E
z ig NM OS1 8goo
C
ltl
a
1101
C CCI
0
o CI
ltl CI
z
CI
ltl
3 lii
II
C C
o CI
EnE
j 000
C
o
CI
o ltl
o U
0
c I
o CI
Q g c 00t5JOenQenenE Oltlcctl0CJ0tccQctlenQenQQltl11
ea j ctlE l0Q en Q lc lCEJEenQUenooctltl
OJ Q ctl Cl Q en a E ctl 0 CIEc15Qlw106c10n
g ii3 c
0 E Q g
0 c E J J 0 0 g E E Q 1
Co enUctl CI o Q en Q
Octl OSu cIinenlen00MUJsQlcQ2EQen0Q2EQCJQcen8QCI
Q ctl Q cOJ ctl 0E0aOc00JcEEen0 ltl CIctlen0Q0lctlJ011
Q 0 Cl 0 0 Q aQ Q oo OsocctlocOSctioco0JCIactlCenoQcliUoc
a c E J c a5 g en J Q Q ctl @ 0 Q 11 0
r 0 Q g CD 0
c Q os L e t5 en c Co iiiaE1ilE0EO0
o 2 Q l U CI 11iofOltlOctlSQoeciQOlQicCTC0Qco1EctlcQenjooIlE
a enQ o ctlCl J o Q Q O en c ctlCf onaE0cClenenJCI s
a Q l Q g8g 2 ctlctl cg o o
oCJgcQUCc0Qw0li0CcTCl0
cDc ED J Q O lc J o u Q ES ctlM SUctlJaalCloctlDcenJoaQII sQJLCJcenccQEE0QQcen0ctlQQ
Q ctl ii r Q Q CI 0 c
Ejg g02gctl Ectl Q u Q ECJJ E
Q c oooo v o o u gIDElQSiQccQUecQ CIz28EQjEen8QJE0Emui0Q
Eu o c O Q 1 ctlEg ctl uO EQ gctlctlenctlooOSJQE1enoctlQu 0
Oc IQ Uctl u u J OlQ o Q EcECIenJlctlJcJ0lUIOS5U1CctlESQ1ccCQto0Q000QQ0E0leaQjQJoclJOOIUiaenCfZlctlctloNMoS1SoUctlOQ
11 01
CI
C CCI
E 0 IIoCI
i c ltl c C ltl CI C C
0 11 ltl O z o CI
0 UCI CI E
CI ltl 0 o ltl ltl n EU0oUj0ltl00liicIccI00
m mSgS 2ro0maco aQ co
u 10 co Q m f 0S c Csm10l
0 g m s 2 rn gJco2ccamco91gcQgCD0e8gcdlEco 0
Q 0 ecoa ta S oa5 0 tn C
s E E uEAiQcoCDmOoQ591Bt ig gsSaOggonmQEEcotnSIDQoOJc0Q3woa0co
0oo0 EmacoIDOEgE6rnassgQ1C
Ego 5 i g sg
E as B
if Cl C l E J U CIJ c 1 CQcmQoOEcoOcogoQ2fEssosffi8CDc5coAQ3S04CJ
C E E UE e GSQ8SuQKaQc
j m EQ B s
a5 g 0 g a g S g1OcEoOCDcogoa5EcoctnocrngSa0a0caCoQ1C0JU4coeoQgE281
g cia5 c
s Q 0 c g e 5 8
c 3 B ctJiQ a Q o 1 gQgBEsE5f121ij23JTIc8 c
Q a5ma g 2 Q 2 tEge8BoctJmuoooQncgQwc5Jc
J c a Q O SijECfitngE05ctJg0cs0
o 0 o oO 6 O EECD5SQcoctJcmECaEE 5ECQCDEctJmOoctJ
J 0 0 E U 2 c5l E fJ U g 2
e c E 2 grn m gmQoaooSEoSoEwE TIg0m0gcngBCa5gctJggo5a24OBcAocctJomcnOooa
Q oa a a5 cS o
cg 0 E gg ctJ 83
E am mEEum g cUJ8
E2cc oE 2mQ E86Kg
C3
Q m O25ctJSWCo
Q 15 @ g Q5 c5wOWtnwwo
W rn m w
g E ctJ co u gctJQEe0QtiW01Do8Wg1JQ5EcB g3gBcEEtiUJ8w091QJ
ctJ Q OoQ g B ig EgS
a O gg
g c geDDrno0gE
w o o2 o
ECOw EwctJ olJEw Utn wc
0 S 0 A 2i E 0 5 rn 2 05 0
5 BoE m aE B
55 en C W E Q w 0CJ c t 0
cmw u E ctJ gRg2fEc195mO 26a525OJc5ctJw3S0QJCJ
C E E E uE e Gsg8sKoQJ5
m tnE m EQ B SOEOQEOODQOIDAQ
Q g 0 0 0 0 aS Q 5 g g a
Q t OQ rnc E rnrn Q2ictJgOa5gErncfocg58oBSaaIDm5fU@OgS
c ctJo oOco rnQ m c
0 w a B e 5 3 8
c B Q u 1 O mawgG552t25tntnGcOu
a5 c g
KEgg OJ e8 rn8outngauQgoC5QID
c c c a Q O SEIDfgE0actJ0C5Q
o Q 0 C Q o rn 00 oi t Q 0 Q E SsocSaEE
C w 0 C 0 Q
E 10 C c 0 en 2i 3 g 0 0
c o Q 22CJ S wwo w
e c 15 r E 2 grn Q glSb3rgEctJrnctJgacQOOu28Ecm5g8@0
8 8 rn 8 g Q g 5 5 2gg5g8
2 U EEu S 8
g 1 ID8 EenocCIJSSuow m w
C3
246
w
W 0
c
g
ffi
z 0
o w
o 0
t
U 0
l1lke Rley
Disclaimer
This map is neither alegally recorded map nor a survey and isnot intended to be used as one This
map is a compilation of records infonmation and data located in various city county state and federal
offices and other sources regarding the area shown and is to be used for reference purposes only
The City does not warrant that the Geographic Infonmation System GIS Data used to prepare this
map are error free and the City does not represent that the GIS Data can be used for navigational
tracking or any other purpose requiring exacting measurement of distance ordirection or precision in
the depiction of geographic features If errorsordiscrepancies are found please contact 952 227 1107
The preceding disclaimer is provided pursuant to Minnesota Statutes 9466 03 Subd 21 2000 and
the user of this map acknowledges that the City shall not be liable for any damages and expressly
waives all claims and agrees to defend indemnify and hold harmless the City from any and all claims
brought by User its employees or agents orthird parties which arise out of the use s access oruse of
data provided
Lake Rley
Disclaimer
This map is neither a legally recorded map nor a survey and isnot intended to be used as one This
map isa compilation of records information and data located in various city county state and federal
offices and other sources regarding the area shown and is to be used for reference purposes only
The City does not warrant that the Geographic Information System GIS Data used to prepare this
map are error free and the City does not represent that the GIS Data can be used for navigational
tracking or any other purpose requiring exacting measurement of distance ordirection or precision in
the depiction of geographic features If errors ordiscrepancies are found please contact 952 227 1107
The preceding disclaimer isprovided pursuant to Minnesota Statutes 9466 03 Subd 21 2000 and
the user of this map acknowledges that the City shall not be liable for any damages and expressly
waives all claims and agrees to defend indemnify and hold harmless the City from any and all claims
brought by User its employees or agents orthird parties which arise out of the use s access oruse of
data provided 247
WALTER E KOTCH
8757 NORTH BAY DR
CHANHASSEN MN 55317 7624
TONY A L BATES
8755 NORTH BAY DR
CHANHASSEN MN 55317 7624
ALLEN C SHARON R LINDNER
8753 NORTH BAY DR
CHANHASSEN MN 55317 7624
MELISSA KAY BROWN
8751 NORTH BAY DR
CHANHASSEN MN 55317 7624
CRAIG M SHAFFER
8768 NORTH BAY DR
CHANHASSEN MN 55317 7624
SCOTT B SHANNON MCWHITE
8772 NORTH BAY DR
CHANHASSEN MN 55317 7624
RENEE M EVANS
8776 NORTH BAY DR
CHANHASSEN MN 55317 7624
TERI R HELLING
8780 NORTH BAY DR
CHANHASSEN MN 55317 7624
LEE N GOLDSTEIN
8747 NORTH BAY DR
CHANHASSEN MN 55317 7624
JEREMY LAUGHLIN
KRISTIN SEAL
8784 NORTH BAY DR
CHANHASSEN MN 55317 7624
LYNN A BUCHHOLZ
8744 NORTH BAY DR
CHANHASSEN MN 55317 7624
JEFFREY R MALLOW
8743 NORTH BAY DR
CHANHASSEN MN 55317 7624
DIANE E HOFF
8740 NORTH BAY DR
CHANHASSEN MN 55317 7624
EDWARD M RYAN
ANDREA R SCHEFFLER
8732 NORTH BAY DR
CHANHASSEN MN 55317 7624
ROBERT MORROW
BEVERLY MORROW
8731 NORTH BAY DR
CHANHASSEN MN 55317 7624
THOMAS C WITHAM
8727 NORTH BAY DR
CHANHASSEN MN 55317 7624
RYAN A JANE M WENNING
7284 ROLLING ACRES RD
EXCELSIOR MN 55331 7745
KATHLEEN M LUCE
165 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
CESAR C BECERRA
LEONARDA L LEDESMA
8712 NORTH BAY DR
CHANHASSEN MN 55317 7624
BRANDY CHRISTENSEN
8711 NORTH BAY DR
CHANHASSEN MN 55317 7624
VICTORIA MARIA MORENO
8708 NORTH BAY DR
CHANHASSEN MN 55317 7624
ROBERT SUZANNE JANSSEN
162 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
SALLY O HALLORAN
8707 NORTH BAY DR
CHANHASSEN MN 55317 7624
TIMOTHY R GILPIN
8704 NORTH BAY DR
CHANHASSEN MN 55317 7624
DANIEL R APRIL M WEIR
8703 NORTH BAY DR
CHANHASSEN MN 55317 7624
KENTON C EXNER
ROXY R MICKELSON
8701 NORTH BAY DR
CHANHASSEN MN 55317 7624
MARGERY G SCHEIE
TRUSTEE OF M G SCHEIE TRUST
142 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
JAMES BENSON
DEAN R BENSON
122 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
NANCY G EVENSEN
TRUSTEE OF K R EVENSEN TRUST
17683 BALLANTRAE CIR
EDEN PRAIRIE MN 55347 3435
DAVID LORI FREE
5885 SEAMANS DR
SHOREWOOD MN 55331 8989
248
THOMAS W JOANNE C CHAN
110 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
JODY L ROGERS
106 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
NANCY A SAMPSON
8765 NORTH BAY DR
CHANHASSEN MN 55317 7624
JASON R EIDE
8761 NORTH BAY DR
CHANHASSEN MN 55317 7624
CAROLYN V MORIMITSU
8769 NORTH BAY DR
CHANHASSEN MN 55317 7624
TINA A PENN
8759 NORTH BAY DR
CHANHASSEN MN 55317 7624
GARY R DEVAAN
8773 NORTH BAY DR
CHANHASSEN MN 55317 7624
SUSAN M LETNER
PO BOX 220
CHANHASSEN MN 55317 0220
LESLIE M BERGSTROM
8781 NORTH BAY DR
CHANHASSEN MN 55317 7624
MARK W LINDNER
8785 NORTH BAY DR
CHANHASSEN MN 55317 7624
RACHEL WIDMER
8791 NORTH BAY DR
CHANHASSEN MN 55317 7624
JOYCE A BENNETT
8789 NORTH BAY DR
CHANHASSEN MN 55317 7624
MATTHEW J THILL
8790 NORTH BAY DR
CHANHASSEN MN 55317 7624
MITCHELL S CINDY L VENESS
8794 NORTH BAY DR
CHANHASSEN MN 55317 7624
TIMOTHY P AMLlE
8796 NORTH BAY DR
CHANHASSEN MN 55317 7624
MARY J BACHEL
8739 NORTH BAY DR
CHANHASSEN MN 55317 7624
STEVEN L HAAGENSON
8736 NORTH BAY DR
CHANHASSEN MN 55317 7624
JONATHAN D MUSBERGER
8735 NORTH BAY DR
CHANHASSEN MN 55317 7624
NORTH BAY WNERS ASSN INC
2681 LONG LAK RD
ROSEVILLE 113 1128
WAYNE E ANDERSON
181 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
DONNA M LEONARD
8728 NORTH BAY DR
CHANHASSEN MN 55317 7624
CAROLE K BASTASZ
179 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
ANDREW SARAH PUNCH
8724 NORTH BAY DR
CHANHASSEN MN 55317 7624
BARBARA BERTRAM
177 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
NATHAN HILARY TREGUBOFF
8720 NORTH BAY DR
CHANHASSEN MN 55317 7624
TERRI LYNN BAUMBERGER
8719 NORTH BAY DR
CHANHASSEN MN 55317 7624
JUDD C SHIRLEY R MORGAN
161 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
ANTHONY C BELL
8716 NORTH BAY DR
CHANHASSEN MN 55317 7624
CATHI M LEE
8715 NORTH BAY DR
CHANHASSEN MN 55317 7624
KAREN L BRIGGS
157 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
249
BEVERLY ANN SPORRE
166 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
DAVID C MAJOR
158 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
TARY JANE ADAMS
154 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
MARY BETH MAKI
150 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
JANET L NYDAHL
146 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
DONALD L ESTHER EGGEBRECHT
TRUSTEES OF TRUST
138 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
ALBERT S DOROTHY I KOCH
134 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
GRACE B MICHAEL J HAZZARD
TRUSTEES OF G B HAZZARD TRUST
130 LAKEVIEW RD
CHANHASSEN MN 55317 7625
JOHN D MELANIE L RINGSTROM
126 LAKEVIEW RD E
CHANHASSEN MN 55317 7625
STATE OF MINNESOTA DOT
METRO RIGHT OF WAY
1500 W COUNTY ROAD B2
ROSEVILLE MN 55113 3174
SIENNA CORP
4940 VIKING DR 608
MINNEAPOLIS MN 55435 5318
CHARLES CUDD LLC
275 MARKET ST 445
MINNEAPOLIS MN 55405 1608
WOODDALE BUILDERS INC
5435 FELTL RD
MINNETONKA MN 55343 7983
250
BEARPATH GOLF COUNTRY CLB LP
4940 VIKING DR 608
EDINA MN 55435
DANIEL L DARCI 0 MONSON
18707 BEARPATH TR
EDEN PRAIRIE MN 55347
JOHN A BUSHEY
9000 LAKE RILEY RD
EDEN PRAIRIE MN 55347
MARK T WAGNER JANE E WAGNER
18743 BEARPATH TR
EDEN PRAIRIE MN 55347
MID WARREN BIELKE
18719 BEARPATH TR
EDEN PRAIRIE MN 55347
ROBERT NANCY COHEN
18683 BEARPATH TR
EDEN PRAIRIE MN 55347
SCOTT HEIDI FREDERIKSEN
18626 BEARPATH TR
EDEN PRAIRIE MN 55347
BEARPATH HOMEOWNERS ASCN INC
C O COMMUNITY DLVPT INC
7100 MADISON AVE W
GOLDEN VALLEY MN 55427
DAVID H SUSAN E ROBERTS
18671 BEARPATH TR
EDEN PRAIRIE MN 55347
JULIE MARIE TOLLEFSON
8964 ENGLISH TURN
EDEN PRAIRIE MN 55347
MARY JO BRUCE E CARLSON
8988 ENGLISH TURN
EDEN PRAIRIE MN 55347
MN DEPT OF TRANSPORTATION
DIRECTOR RIGHT OF WAY
ST PAUL MN 55155
RODNEY S WALLACE
18662 BEARPATH TR
EDEN PRAIRIE MN 55347
THOMAS STEPHANIE DREES
14727 BOULDER POINTE RD
EDEN PRAIRIE MN 55347
CITY OF EDEN PRAIRIE
8080 MITCHELL RD
EDEN PRAIRIE MN 55344
DONALD G VIRGINIA A EAMES
18755 BEARPATH TR
EDEN PRAIRIE MN 55347
KENNETH M ROSS
8976 ENGLISH TURN
EDEN PRAIRIE MN 55347
MICHAEL S MCVAY
18650 BEARPATH TR
EDEN PRAIRIE MN 55347
ROBERT NANCY A COHEN
18683 BEARPARTH TR
EDEN PRAIRIE MN 55347
RONALD E VIRGINIA A LUND
9002 RILEY LAKE RD
EDEN PRAIRIE MN 55347
MR PAUL BOZONIRE
NORTH BAY HOMEOWNERS ASSOC INC
C O NEW CONCEPTS MGMT GROUP
4915 WEST 35TH STREET 102
ST LOUIS PARK MN 55416
251
252
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
1t
MEMORANDUM
TO Todd Gerhardt City Manager
Paul Oehme P E Dir of Public Works City Engineer
O
FROM
DATE November 26 2007 j
SUBJ Lyman Blvd Improvements Project No 06 03 Approve
Resolution for Advancement of Municipal State Aid Funds
REQUESTED ACTION
Approve Resolution for Advancement of Municipal State Aid Funds for the
Lyman Boulevard Improvements
BACKGROUND
On November 13 2007 staff updated the Council on the Lyman Boulevard
project and draft agreements
PHASE 1 CONSTRUCTION
Currently Carver County is working on final design construction plans for Lyman
Boulevard for Galpin Boulevard to Audubon Road South CSAH 15 The project
will widen Lyman Boulevard from a 2 lane rural section to a4 lane urban divided
roadway section with turn lanes and signals to accommodate the anticipated
future traffic for the corridor Staff is working with Carver County to evaluate if a
roundabout would be the preferred intersection improvement at Galpin Boulevard
Three signals are included in the project at the other major intersections Apid
date of May 2008 is planned with construction starting in June 2008 and final
completion in 2009 The project is proposed at this time to accommodate the
increased traffic on Lyman Boulevard projected from the Chanhassen High
School
A pedestrian underpass is proposed under Lyman Boulevard between Audubon
Road North and South This underpass is a critical connection for the City s trail
system It will connect the new development areas south of Lyman Boulevard in
the 2005 MUSA to the existing trail system north of Lyman Boulevard and to the
High School A trail is included in the project on the north side of Lyman
Boulevard from Galpin Boulevard to Audubon Road North
A new crossing for the Twin Cities WestemRailroad is proposed to match the
new roadway section New crossing guard arms roadway approaches and sensors
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play253
Todd Gerhardt
Lyman Boulevard Improvements
November 26 2007
Page 2
will be installed A signal preemption system will be installed when a train is
approaching so the intersection can be cleared
A 16 trunk watermain will be installed from Galpin Boulevard to Audubon Road
South in conjunction with the High School improvements The watermain will be
installed in the Lyman Boulevard right of way A 16 trunk watermain from
Audubon Road South to Audubon Road North is proposed to be installed in
conjunction with the Lyman Boulevard improvement project to complete the
trunk watermain looping system under Phase 1 A portion of the cost for the
trunk watermain is proposed to be charged back to the future development
Watermain and sewer services are proposed to be stubbed to the Holasek
property These costs are proposed to be added to the connection charges when
the property develops Due to the schedule of the project assessing the properties
at this time would be problematic
ADVANCED MSA FUNDING
The City will be responsible for a large portion of the cost of the project Staff is
proposing a portion of the City s project costs be paid for with Municipal State
Aid MSA funds for the first phase of the project The City currently does not
have a balance in the MSA account However the State does allow for fund
advancements of future MSA yearly allotments The advancement funds are
competitively applied for by Cities and Counties since the State has a limited
amount of funds to advance The advancement does not have interest charges
since it is only an advancement on future years allotments It is estimated that it
will take 3 years to pay back the advanced funds for the phase 1 project
Application for Advancement of State Aid funds is due on November 30 2007
Attachment I Resolution
2 Map
G ENGIPUBLICI 2006 ProjeclSI06 03 Lyman Imp Powers to TH 41 Bkgd 112607 res MSA advancement doc254
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
DATE November 26 2007 RESOLUTION NO 2007
MOTION BY SECONDED BY
A RESOLUTION APPROVING MUNICIPAL STATE AID STREET FUNDS
ADVANCE FOR LYMAN BOULEVARD IMPROVEMENTS
PROJECT NO 06 03
WHEREAS the Municipality of Chanhassen is planning to implement Municipal State Aid
Street Project s in 2008 which will require State Aid funds in excess of those available in its State
Aid Construction Account and
WHEREAS said municipality is prepared to proceed with the construction of said
project s through the use of an advance from the Municipal State Aid Street Fund to supplement
the available funds in their State Aid Construction Account and
WHEREAS the advance is based on the following determination of estimated
expenditures
Account Balance as of date 11 19 07 0
Less estimated disbursements
Project 194 020 008 1 500 000 00
Total Estimated Disbursements 1 500 000 00
Advance Amount amount in excess of acct balance 1 500 000 00
WHEREAS repayment of the funds so advanced will be made in accordance with the
provisions of Minnesota Statutes 162 14 Subd 6 and Minnesota Rules Chapter 8820 1500
Subp lOb and
WHEREAS the Municipality acknowledges advance funds are released on a first come
first serve basis and this resolution does not guarantee the availability of funds
NOW THEREFORE BE IT RESOLVED that the Commissioner of Transportation be
and is hereby requested to approve this advance for financing approved Municipal State Aid
Street Project s of the Municipality of Chanhassen in an amount up to 1 500 000 00 I
hereby authorize repayments from subsequent accruals to the Municipal State Aid Street
Construction Account of said Municipality in accordance with the schedule herein indicated
l Repayment from entire future year allocations until fully repaid
255
Passed and adopted by the Chanhassen City Council this 26th day of November 2007
ATTEST
Todd Gerhardt City Manager Thomas A Furlong Mayor
YES NO ABSENT
256
l
I
November 6 2007
G Eng Jo r r n EngProjects Pau LymanStImp
257
3
PATROL DIVISION
CHANHASSEN STATION
Memo j
To Mayor
City Council
Date 11 16 07
From Sgt Peter Anderley
Re Items for November Council Meeting
1 Sheriffs Office Area Report October Attached
2 Sheriffs Office Area Citation List October Attached
3 Community Service Officer Report
4 Miscellaneous Items I will have brief information for Council on recent
activities or items of interest
258
City of Chanhassen
Reports
For
October 2007
259
1
Listed below is a description of each of the different classifications of calls for service
which the Carver County Sheriff s Office received and processed for your area
ICRIMINAL
Part I Crimes
13A Arson Intentionally destroy property by fire
AA Assault Aggravated Assault where substantial injury is caused or deadly weapon used
B Burglary Breaking into a residence or business
H Homicide Intentional taking of a persons life
R Robbery Taking of property in the presence of another with use of force
SR Rape Forcible sexual assault
T Theft Taking of property stealing
V Theft Vehicle Theft of a motorized vehicle
Part II Crimes
6 Abuse Neglect Chargeable abuse or neglect of children or adults
A Assault Altercation between parties where actual physical harm occurredOFPCourtOrderViolationsViolationofcourtorders
DP Disturb Peace Chargeable disturbance of peace Harassment disorderly conduct
D Drug Violation All drug violations possession of sale of manufacture ofGGamblingUnlawfuloperatepromoteorassistintheoperationofgamingLVLiquorLawsIllegalConsumptionsaleorpossessionofliquorMMiscCriminalMinoroffensesthatdonotfallunderanyotherclassification
P Property Damage All damage to property including vandalism littering and trespassing on propert5RRunawayJuvenilerunaway
S Sex Crimes Misc sex crimes criminal sexual conduct sexual abuse pornographyindecentexposure
30 Suspicious Activity Suspicious activity where charges result
U Theft Related Fraud credit card theft ID theft issuance on bad check counterfeiting swindleJTrafficAlcoholTrafficstoporaccidentinvolvingadriverundertheinfluenceofalcoholordrugs1TrafficOtherTrafficstopthatresultsinatrafficcriminalchargeDACIPSHitandRunWWeaponsViolationofmanufacturesalepurchasetransportuseoffirearm
260
NON CRIMINAL
6 Abuse Neglect NC Investigation of abuse or neglect of a child or adult where no charges are filed
AD Adoption Record Check Records check for persons adopting a child
3 Alarm Checking on an alarm at a private residence or business
9 Animal Animal bites stray animals All calls involving animals
12 Assist other Agency Assist other law enforcement office state patrol or government departments54AutoAccdFatalityAutoaccidentinwhichafatalityoccurred
52 Auto Accd Injury Auto accident in which injury and property damage occurred
50 Auto Accd Prop Damage Auto accident in which property damage occurred
51 Auto Accd MV vs Deer Auto accident involving a motor vehicle and deer
20 Boat Water All incidents involving boats watercraft and or lakes
CCA Child Care Assistance All background checks for soc Ser Unlicensed child care assistance
60 Child Custody Dispute Incidents involving dispute over child custody16CivilProcessServiceofcivilpaperscourtordersAssistwith civil stand by situations
DP Disturb Peace NC Noise harassments disturbance of peace where charges are not filed4DomesticVerbalargumentbetweenpartieswherenochargesarefiledMusthave relation80DrivingComplaintComplaintsofbaddrivingbehavior
D Drug Information Information regard drug activity No charges filed
EP Employment Background All background checks for employment
13 Fire Call Fires and assist to fire departments
24 Gun Permit Acquire Application for a permit to purchase a handgun
25 Gun Permit Carry Application for a permit to carry a handgun
26 Gun Permit Transfer Applicaton for the transfer of one registered gun to another
27 Explosive Firearms Dlr Application for a permit for explosives or firearms dealer license
11 House Business Check Check on residences or business when owners are away from propertyLDCLicenseDayCareBackgroundcheckforlicensingdaycare
LFC License Foster Care Background check for licensing foster care
LL License Liquor Background check for liquor licensing
LP License Peddler Background check for peddler licensing10MedicalAssistpersonswithmedicalissuesnatural cause deaths
15 Mental Health Suicides 72 hr holds for mental health issues
1 Misc Non Criminal General law enforcement questions citizen assists lost and found propertycivilmatterscouncilpacketsandmeetingsjuveniledisciplinaryissuesetc5MissingPersonMissingLostperson
NC Name Change Court order legally changing an individuals name
31 Open Door Located an open door to a business or residence
14 Prowler NC Person on property who does not belong window peeper No charges filed
99 Sex Offender Tracking Request from State to check location of registered sex offender
30 Suspicious Act NC Suspicious persons acts or vehicles no charges21SnowmobileAllincidentsinvolvingsnowmobiles
8 Traffic Misc Misc traffic issues stalled vehicle debris on roadway traffic control
parking violations vehicle in the ditch and motorist assists
88 Traffic Radar Display Traffic Speed Radar wagon
38 Traffic Stops All traffic stops initiated by officers
17 Transport Transport persons for various reasons
2 Unlock Veh Bldg Unlock doors of automobile residence or business for owners
18 Warrant Issued Warrant issued by Carver County Court Administration
19 Warrant Service Service of warrant for Carver County and other counties
261
CARVER COUNTY SHERIFF S OFFICE
City of Chanhassen
Month of October 2007
ICITATIONS
2007 2007 2006 2006
I M
9
TH I 2 1 I M
O
TH I 36 I
rimes
ravated
rimes
IPart II Grimes
Abuse Neqlect 0 0
Assault 4 42
Court Order Violation 1 9
Disturb Peace 11 91
Drug Violations 3 34
Gambling 0 0
Liquor Law Viol 1 42
Misc Criminal 3 24
Property Damaqe 26 246
Runaway 1 26
Sex Crimes 1 10
Suspicious Activity 0 0
Theft Related 7 92
Traffic Alcohol 4 61
Traffic Other 0 2
Weapons 0 0
Total Part II Crimes 62 679
ITOTAL CRIMINAL 113 1048
0 0
1 4
6 46
0 0
0 0
0 1
26 339
3 25
So 415
1 7
8 74
0 16
5 58
4 26
0 0
4 38
7 37
39 248
5 23
1 16
0 7
13 97
6 71
1 10
0 1
4 729
130 1144
262
2007 2007
IVIUN I M I YTD I
INON
IAbuse Neqlect not charqable 4 35
Adoption Records Check 0 0
Alarm 93 930
Animal 57 506
Assist other Aqencv 8 94
Auto Accd Fatalitv 0 0
Auto Accd Iniury 8 75
Auto Accd Proo Damaqe 45 432
Auto Accd MV Deer 7 34
Boat Water 1 87
Child Custody Dispute 3 16
Child Care Asst Unlicensed 0 3
Civil Process 2 21
Dist Peace not charqable 42 363
Domestic not charqable 3 57
Driving Comolaints 47 527
Drug Information Onlv 2 16
Fire Call 14 193
Gun Permit Acquire 6 73
Gun Permit Carry 1 43
Gun Permit Transfer 0 0
Exolosive Firearms Dlr Permit 0 0
House Business Check 3 20
License Dav Care 6 34
License Foster Care 0 14
License Liquor 0 28
Medical 56 547
Mental Health 3 57
Misc Non Criminal 71 723
Missinq Person 1 26OpenDoor4768
Prowler not charqable 3 14
Snowmobile 0 13
Susoicious Act not charqable 100 922
Traffic Misc 92 1245
Traffic Radar Disolav 0 0TrafficStoos3423401
Transport 0 1UnlockVehBldq12106
IWarrant Service 6 111
IUIAL NUN 1Utlb 1Utl35
ITOTAL REPORTED 1198 11883 I
2006
MONTH
2006
YTD
1 48
0 5
83 768
51 432
10 111
0 0
4 73
42 160
5 31
0 63
1 18
0 0
2 11
21 353
6 54
53 457
2 21
31 214
11 65
5 31
0 1
0 0
4 14
0 36
0 26
1 2
42 482
4 41
65 623
1 28
5 64
1 8
0 7
103 921
117 1292
0 1
439 3836
0 1
10 102
15 84
1135 10484
1265 11628
263
W
t
u
0
u
0
o
D
enu
W
O
zO
WWJ
enwenentzJ
CJZoo
t
U5O
O
uWOWn
I
IgUUCI
N
t
l
C
l
0
0
t
jN
p
OJUE
0
OJ8
C
n
0
0
l
0
0
N
0
t
8Qj15E
N
OJ
0
C
0
0
0
c
C
inJ
C
OJ
N
0
l
0
0
0
C
t
0
0
D
0
0
0
t
0
OJe
0
0
0
0
co
C
0
N
I
0
0
C
0
0
0
co
0
NN
N
0
0
0
N
N
fu
0
0
0
0
0
l
C
JQ
0
0
C
0
0
0N
roJ
0
N
l
0
0
0
D
cl
0
1Il
OJ
IV
ro
E
ro
OJ
t3
1Il
I
IVE
c
1
8
OJ
OJ
I
0
I
f
e
Jtj
E
c
G
4
4
1
0
l
E
0
Ig
Q
OJ
l
l
J
0
0
c
c
0
co
I
lY
lY
l
I
t
N
t
N
t
D
D
0
N
0
t
j
j
C
0
t
N
t
N
0
j
D
N
0
N
0100
0
t
C
0
C
D
0
t
0
0
N
0
N
0
0
C
C
co
0
0
N
D
0
0
N
0
0
0
0
N
t
j
C
0
0
D
00
C
0
j
0
l
0
D
j
N
0
N
0
0
C
0
C
D
l
0
l
0
0
j
0
D
0
t
N
N
0
0
C
j
l
C
0
t
D
0
0
0
CO
N
0
l
0
t
D
0
CO
0
0
0
0
N
CO
N
0
l
CO
N
0
0
N
N
0
0
0
N
0
CO
N
0
0
t
N
N
0
t
C
0
0
0
l
0
0
N
l
0
0
j
t
0
T
le
1Il
0
IV
pro
OJ
E
0
g
1Il
l
0
U
0
0
t3
u
Q
e
ro
E
OJ
c
IV
OJ
U
0
ro
0
OJ
E
I
ro
p
ro
l
u
c
Q
Q
ro
E
0
OJ
l
Qj
is
1
OJ
E
a
0
I
ro
I
E
J
l
Z
0
I
c
0
lY
I
I
e
0
U
C
u
0
Q
J
1i
I
U
U
n
0
ni
1
II
ro
J
g
E
j
Q
cv
t
E
ro
J
l
J
m
J
e
X
l
OJ
l
ro
ro
OJ
0
l
0
ro
g
e
J
OJ
J
c
0
U
0
0
9
I
a
lY
f
f
l
I
264
O
N
C
C
C
N
ill
OCO
O
C
C
Nillj
C
C
OOO
ro
N
ro
C
N
OO
O
j
v
C
ro
NC
NC
N
N
j
QuEQotwQ15
OC
rooro
C
ONNCN
ill
OOC
illOOillCC
ogNo
oNill
j
j
C
O
m
Oilloill
OO
ro
OOOO
OON
NCNOO
O
oroC
C
ill
ill
j
j
JOJ
O
O
N
O
roC
illj
NOO
ONOOroON
NO
O
ONN
NO
C
N
j
C
NO
OO
NOCO
O
C
N
OOO
O
illg
N
O
O
O
j
j
ill
ill
ill
C
Qe
C
O
ro
OO
C
roCON
Oill
j
OOOO
NON
C
NC
O
O
roill
ill
ro
N
C
O
C
j
OroNCrooo
roj
OOOC
OONOCroo
oill
o
O
ro
C
N
ro
N
Q
Oj
rooroC
ro
ill
N
N
R
N
j
C
C
NCN
O
illOOCC
ON
NO
O
roO
oroj
I
ogm
o
o
OOO
OOCNCN
OOCN
j
ONC
O
O
C
C
N
N
N
J
O
O
OOON
ill
N
C
OO
OOO
ill
C
O
O
O
roJ
illO
O
j
ONN
j
C
Oj
OOillNCO
OOill
O
O
j
e
roC
C
C
9
u
roQ
u
k
Q
EQ
Q
Ou
Q
I
I
roO
e
0
Q
1
Uu
u
O
Iq
G
e
J
EB
uro
ro
U
Ig
I
e
I
E
e
z
Q
Jlg
6
2
8ro
ro
mo
Ee
I
0
Q
ng
Q
roE
U
Q
I
J
co
uro
ffi
Q
Q
0
u
I
I
e
I
ro
L
Q
I
I
I
I
0
ro
Z
E
u
0
ol
g
ro
U
L
U
oro
0
Q
Q
ro
Q
Q
Q
I
OO
u
Q
oz
Q
Q
e
5
S
L
U
u
Q
J
I
I
o
J
OOt
oo
o
ouuuu
Jroe
roQ
Q
Q
Q
Q
Q
ZgOLE
Q
I
ll
Q
uU
glu
2
5c
g
I
5EE
oooo
E
51
Q
eeeAJQ
Q
Q
oeuQ
eoL
o
e
o
o
c2
JJ
JxouuuQ
Q
eeJ
Z
muUUOOOOu000WI
O
oooo
265
rooN
EoZEo1JJZoEoEoU
rolcfrooN
0V
o
N
U
0
CJC
0Q
lll
roo1ro
co
J
izzzzzzzzzzzgcfaWft
tntnt
t
i2
l
9
9
l
l
l
0
a
l
j
l
OOOJJ
5
t
t
t
OJ
J
Jooo
t
en
t
t
o
U
U
U
C
2
O
Cl
Cl
o
c
c
c
0
0
t
t
r
U
Cl
l
0
i
i
i
wl
0
voE
Eo
oJrzaaZff
f
f
z
v
l
c
ut
l
cl
E
a
0u
0
c
0
c
O
ui
l
o
C
c
r
Jrz
l0oU
Nro0zzzzzzzzzzzzzzzzzzzzzzgzzl
laa
u
ut
t
t
9
t
t
0
oj
t
t
ci
0
ff
o
C
t
o
9
0
oClC
lo
U
v
0
0
l
U
o
i
l
0
0
l
t
0
t
Cl
JrZZ
0ci50
tnctZclaJ
tn
0
l
t
l
l
l
l
v
a
9
a
a
a
a
cojd
t
0
t
t
t
t
t
C
t
t
0
t
OJ
00
OJ
00
OJ
l
9
t
t
5
5
5
5
j
9
a
t
U
Cl
Cl
cl
Cl
V
0
0
0
0
0
0
t
E
oEoOOOOC
lVzaci5zzZZ5
Q
aUisI
l
U
OJ
w
U
t
l
l
f
0
u
5
Ccl
Caa
0
ci5
g
g
05cot
t
8J
0C
OJ
U
0
u
J
U
5
f
5
5
0
U
Et
U
8
t
l
Cl
Cl
U
0f
f
000
0
0
u
o
oV
V
OM
OOv
O
M
V
M
Nv
OO
oo
o
r
MM
MM
N
N
M
MMMM
N
N
OO
O
O
O
O
O
O
O
O
zO
O
1tnclltt
co
otn
l
l
0
c
U
o
V
l
15c
l
r
r00 Qooo
ll0000N
I
g
Z
MM
M
C
M00000sgguggIV
NOO
U0
0
2
0
2
co
O
co
0
00000
O
@
00
0
00
oo
oot
o
O
c
2
gc
c
2
tE
02
E2222
coc
J
J
C8
t
3t
t
t
t
C
cl
9cl
l00
l
0
ul
l
l
vl
l
B
n
OJ
OJ
COocl
COCOUCOCO
t
CO
c
cl
tn
U
cl
J
0
cl
cl
cl
cl
c
l
r
f
C
C
f
V
V
UJ
oVl
V
a
J
JJ
JJV
U
oo
8
5
5
E
o
o
oo
o
Bo
oooo
o
C
oo
C
JC
U
C
o
JC
CO
C
C
J
r
r
oo
r
r
M
r
r
r
r
r
r
r
r
r
r00000 00000N
N
N
C
lS2S2S2S2S200000
r
r
r
r0000 0000N
C
l
N
NS2S2S2S20000
r
r
r
r
r
r000000 000000NNNNNNNNMMM000000000000
r
r
r000 000N
N
C
l
M000000
r
r
r 000000NNN000000
r
r
r 000000000000
r
r
r
r 00000000NNCIN
V
VS2S2S2S20000
lI
r
Or
C
l
N
C
lMNNNM
M
M
M
M
M000000000000000000000000
C0NrN
M
MMCM
MM000000000000000000
0
0
r
r
M
M
M
M
Cfl000000000000
o
NIOr
MV
NNo
O
M
NN
O
r
O
N
ON
r
v
v
OO
Nr
N
r
N
N
10
M
Cl
M
N
M
MMMC
MNMMMMMMC
MMMMMMCflMMMC
MM000000000000000000000000000000000000000000000000000000000000000000000000000000
O00r
V
ClM
M
C
Cfl000000000000
C
1
cNNr
r
M
M
M
c
M
M000000000000
ON
r
N
M
N
M
M
M
M0000000000000000000000000000000000000000V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
VNNNNNNNNNNNNNNNNNNNNNNNNNNNN0000000000000000000000000000
00cl
cl
0
022
5
Et
C
0
v
l
ci5
OJ
J
r
ooo
c
0
0
r
r
r
r
r
r 000000V000000
r
r oo000000
M
00
0
0M
N
c
M
M000000000000
rO
NN
r
r
r
M
M
M
M
C
M
M
M
M00000000000000000000000V
V
VNNNNN00000
266
rooN
EoclZEorrlZoEoEoU
rolcfrooN
0V
o
N
VJ
0
V
0
en
e
roro
t
M
I
00
s
V
N
VJ
00
ZZZZ
ZZZZZZZZZZZZZZZZ
0
o
EJJ
rIZo80W
I
l
Wo
u
Vl
0
l
1
I
t
r
E
E
f
E
l
OOz
ti
z
I
J
0
J
U
if
o
8
U
o
ot
0
ro
03
I
c
2
0
J
U
01
Z2
JZUOlE
0oU
o0rl000
N0oINV
zzzzzzzzzzzzzusWVJVJo0d0t
l
l
l
l
c
g
S
S
g
t
ro
ro
l
0
1
1
l
l
r
J
5
l
0
0
l
f
Vl
Vl
o
J
i
0
0
c
o
t
O
l
000
0
JJ
g
0
U
U
0
010
Oo
Oo
c9uuOe
l
2J
gl
l
l
O
EEl
c
l
l
l
l
l
orooE
E
o
O
Z
ZEE
VJZ
l
l
l
u
u
u
I
I
I
ro
ro
ro
U
JS8U3
Ul
US
t
f
I
t
Vl
t
g
t
Vl
o
eE
O
OE
0
ci
Eo
t
cia
cia
t
g
0
t
t
t
o
og
0
og
g1l
g
J
EIlc
gIl
E
IlC
l
t
l
0
0
ot
0
lo
t
0
l
t
0
O
ZZZOZrl
OZ
OZ
lutroltIl4o
t
4
1
1
00
VJo
c
o
0c13z
N
o
0
O
OOOON
v
O
OOv
oo
oO
OOOON
OO
OMr
V
N
Or
r
Nr
Nr
Nr
OU
o
r
OO
J
O
E
g
g
g
g
gO
ogggg
g
gg
Vllo
coV15r
JIII
rCIlO QoOOS2or
I
r
z
MCM900CIlO0080CIlVIlINlllo
0a5
r
oC
Clroc
i
c
E
g15
VJ
0
l
00
5
I
r
Cl
50
t
EV0
V
M
M
r
r
r
r0000 0000OOr
rS2S2S2S20000r
OooNOO
O
r
NO
M
N
MMMrM
C
MMM0000000000000000000000000000V
V
V
VNNNN0000
Cloo61
esl
V
r
N
r
r
r
r
r
r000 000NNNr
r
rS2S2S200000
00
r
0
C
0
r
ON
C
C
C
r
C
M
C
C000000000000000000000V
V
V
N
N
N000
l0Corr
t0
m
0
g
l
ot
OClU
o
8
0
O
l
m
CiJ
U
oe
l
l
eN
l
r
N8a5U
ro
002
VJr
r
m
00
ro o00oo
r
r
r
r
r
r000000 00000000000000000S2S2S2S2S2S2000000
VnVCCoooooo
O
O
O
O
C
O
OOO
Or
ONooN
C
C
MNCN
M
C
r
C
r
M
M
C
M
C
C
M000000000000000000000000000000000000
oVNo
000000V
V
V
V
V
VNNNNNN000000
J00
VJ
0
0
0
0
VJro
I
00
l
l
l
0
r
ut
l
l
l
0
0
0
VJ
o
uuu
1
tt
tt
S
mmO
ll
ll
l
0
t
ClmCQcoVJ
o
oooooo8U00
t
r
r
r
r
r
r
r
r00000000 000000000
0
0
0
0
0
0
0
000000000000000NC
V
V
0
r
O
oo
o
NNONO
O
O
oo
NNMNO
OO
C
MMCNC
INC
rl
M
c
C
C
M
C
M00000000000000000000000000000000000000000000000000000000V
V
V
V
V
V
V
VNNNNNNNN00000000
O
V
r
OrONON0
0
0
0
01
ro
d2
2
0IOOl00a5L0
ec
rog
V
v
l
J
r
r
r
r
r
r
r
r 0000000000NCINNN0000000000Or
oo
0
000V
0
N
N
N
C
l
NNNNNNr
C
C
r
M
C
C
MMM00000000000000000000000000000000000V
V
V
V
VNNNNN00000
267
EozEolJJzoEoEoU
toorolEtOoN
0V
o
N
CI
0
J
Q
tOot
J
ZZZZZZZZZZ
ZZZ
rIt
N
N
000I
INNV
V
Nto0
ZZZZZZZZZ
ZZZZZZZZZZZ
WJoCIQoCIwJUWJc
t
al
01
J
Cl
ES2cZiO
V5
9
i
gs
CI
WJtI0
E
O
CI
Or
J
c
8
8
8
i
z
8
5
cO
g
g6
6v
g
t
0
tI
s
01
J
b
I
0
s
s
0
5
Z
G
OJ
s
s
0
0
0
OJ
tI
0
c
0
01
0
U
oWJ
tu
0
u
0
v
r
r
00
u
CI
o
Oj
o
uw
vv
U
o
c
01
c
v
v
v
V
01
JJ
5
o
0
0
0
t
8
8
8
8
0
o
E
e
cZiZtI
E
ZJt
I
CI
CI
UtI
ZOOO
E
v0oU
v
l
u
u
01s
l
f
5l
0
5
o
UJeoc0
s
s
0
0
O1
01
oU
Ci3
2
2
o
Ecc
o
l
0
e
cZiE
ZE
vulo0tsoUv
v
OJ
0tl
E
0
UV
OIOO
t
OOOOONM
OIOt
lOoot
N
OIO
J
o
00t
IO
v
0
10
010
ulOl
OlOl
Ot
IO
1O
OO
o
0
o
V
MOONOO
OOO
100
OO
Nt
O
OMOONNO
ONN
0
Z
0
0
0
0
0
0
0
0
0
0
0
isOJasl
co
oll
U
sc
v
to QoOo0o
l
N
Z
C
1M
C
r000s8u810VNo
isOJaS
oo
ala
l
g
v
U
0
56
c
e
lV
V
V
ii
r
r
r
t
t
t
t0000 000004
4
40000N
OO0
N
N
C
lNNNM
M
r
M
rl
M
M
M0000000000000000000000000000V
V
V
VNNNN0000
9
oo
S
ala
l
8
s
s
V
l
2
0
U
5
ltOOl
V
V
V
alo
r
r
r
t
t
t
t0000 00000000t
NMVV
V
IONNNMNNNM
r
M
M
M
M
M
M0000000000000000000000000000V
V
V
V
N
C
1
N
C
10000
ollloWJO
o
tl
V
olflotc1O
r
tt
t00 0000t
M
IOMN
V
1
N
M
M
M
M0000000000000
0
V
VNN00
al
CI
o
o
CQOtiU
l
OJi5
ol
0
0
o
t
t
t
t000 000000V
00
10
OV
O
V
t
V
M
M
rl
M
M
M
M000000000000000000000V
V
VNNN000
r
i
s
t
l
l
Cl
alt
l
al
alO
l
V
ol
V
e2
t
tig
t
Ot
01ll1i3
oV
oV
o
0
0
Ur
Ut
t
01s
o
0
s
EZu
22
E
V
l
0
ol
c53
c53
Ze
0
s
s
o
0
D
D
l
l
Ol
l
V
V
o
r
t
t
t
t
t
t
t
t
t
t 0000000000000000NNNNNrM000
0000010
0010
V
V
IONI
ONMNMNM
M
M
MMMMM000000000000000000000000
1Ot
00010
10NNNNNNNNr
M
r
MMMMM00000000000000000000000000000000V
V
V
V
V
V
V
VNNNNNNNN00000000
VUsCJu
d
OOt
c
I
0
a
0
g
o
v
c
0
2
vi
0
8
cc8O
Cl
UUtI
OZo
Vs5
E
E
v
V
c
c
o
0ZZ
0
0
alt
ol
ce
olE
ECo
s
U
og
l
VO
a
a
s
l
ol
al
V
S
l
l
tI
eEc3
j
NN
t
t
t
t
t 0000000000MrlMMr
l00000o
t
t
IO
00
t
V
rl
M
V
N
N
t
t
C
l
NNMrlN
MMMMrl
rl
M
r
M
M00000000000000000000000000000000000V
V
V
V
VNNNNN00000
rl
oVVUocZiooo00t ooNMo00MtMMMoooooooVNo
268
C
Z
rJJ
l
Z
o
u
r
o
o
N
o
2
fo
r
o
o
N
0
on
o NCIl0
co
0
ell t
r
o
o
r
o
I
II i
ZZZZZZ ZZZZZZZZZZZZZZZZZZZ
0
o
5 gf
E f S
o CIl
o 01 JO
U a S S
5 11
g gg ZO
u luu w
lU uu O
c 0 cl 0
u4l 01 t 4 l uggu
f CIl f f CIl O
o
0
a
c
o
I
a
Cl
u
0
U 0
IOCll
cl Cl c
0 A 0
U
o 0 0 0
E1lcti 22fI100
J5 J5 05 5G
N
I
t
N
N
0
5zzzzzzzzzz
I
u
Ccl
C U5 g c
I 0 S
ell 60C C
ci
c f
g I 0 g l ellCl
o 0 CIl E I
I tl CIl 0 o B0g3o2il5C1lJOZCIloWCIl
CI
0
o
U
u Oo OOMO OOO Or OtotootMtOOttNttNrJ
0
CO
0
c Cl
tl c0 CO
0
j c
c 0 t1
5SononSCIl
0orrrJ
o
I
I
ClO
Ucoco12c
cog
Cbciaf
0
In JI i5
gon
rrc g
CI
r r r r r r rtooooooo
ooooooo
O C C C C C C
Cl Cl tt tton
l
rn 0000000
troo OOOOO
r oo r r o
z 8egegeg
NClNNNMN
MClC lMMMM
000000000000000
sggggggg
Oggggggg
10 0 0 0 0 0 0tonononVonononlJNNNNNNN
0000000
OQ
l D
I C
0 1
CIl CIl
00 0f
coco a3
0 010 1
0 0 0 0 e e ecllfl l CIl
Ol l 2 00
D O J I aggJi
2E2s COC02 CO
onCOCOCON
ooo g
r rA A r0 r
r r r
000
000
N I N
on on on
000
r r r r r
00000
00000
N N 1 N N
on
00000
r r r
000
000
C C C
000
OOO O o No ono
IN NonO ONNNNtNMCl
NNNN NOONOOOON
r Cl M Cl M M 1 r N N M
MMMMMrMMClMM
00000000000
00000000000
00000000000
00000000000
00000000000
00000000000
00000000000
on on on on on on on V on on on
NNNNNNNNNNN00000000000
on
o
0
l
o c
EJ
ill
O
11
I U
c 1
2
E C1 CO
o CoEo
on
o
o 0 on
Or oo Cl
1 N on on
0 0 0 0
CIl
f
A
EW
f
f
f
U
i
r
Z
1
Cll CIl
tl SJ
on
f
coJ
OCll
0
I
u
C
tl
U 5
0
D
tl0 0fc
1logE1l cti 0
g g 0
CIlCllWOZ
o
T
o
0
0
0
I
CO
g
0 0
CO 0 gcggsilSAO
CO 0 c g
occo t
0 0
lcl 0 tUUC
r o r
r t
I
u
c
J
5
eIlcofc
u 0
00 022Il10
g g g o
CIlCllCllCJJZ
t
00 0t 0000 t
tr Nr ttr r
ONNNOOONN
0 0 0 0 0 0 0 0 0
r r r r r r r r r000000000
000000000
t
r r r
000000000
N00 tOrMtr
r v N O
r 0 r M r M Cl
00 Cl t N N 00 00 1
NMlr M NNN
MMClC lMMMMM000000000
000000000
000000000
000000000
000000000000000000
000000000
on on on on on on V on on
NNNNNNNIN
000000000
000
l l l
I l l
UUU
1 1 1
22 2
COCO CO
00
COCO
ell
c I
6
0 0
C
20
o j
l
J
Vi
gggrnononr
r r r r r
00000
00000
t trrrrr
00000
n r ooo
o
M Cl r r on
00 00 OOMNN1r Cl
Cl M M Cl M
00000
00000
00000
00000
00000
00000
00000
on on on V V
NNNNN
00000
269
r
o
o
N
Ec
CJ
Z
Ec
rJ1
l
Z
o
Ec
Ec
U
r
o
l
c
r
o
o
N
0
V
o NC0
J
C 0
tlO
r
o
r
o
II
zzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzzz
5
to
l
E
oj
E
l 2 l l
u u
1 tH0060 0
Uo U U
oo o
U 0
CS 0 Cl ClEWJECCC E
0
o
U
01
t
2
l Ci l l
u Cl u u
ij 1
v l
J 0
Cl t 0 a 0 C 5
o0002310
0 g Cl U 0ClOrucO20EoCloogeojO5ZZE5Z
l 1
u u
2n l l c n l
Cl15 Cl Ooa
v 00 v5ESnUU00C0
u u C0e00vC000015v02gqt5t
Lij 55r 5rr 5Z
on
c
Cl ClatfCIl 0
0 ci ci Z
t
oj Cl Cl
l1 221 1 ci
VVClCll Vii55u
V
r 000 7NM 70 0 V oooo V O 00ON777r07r7r777777007rM7777
00 00 l
0
V eCO B
u ut oe
v 0 Q V 2 8 roooocco1
o 0 oO tuCOVl l
e 0 5 c3 c3 c3ovCl N
CO l CO co o CO 1 1 13l2 0oj13o3lctrZtrCOCOCOr
a a c r5 c8G8jE ur ggg
tr V V
0
0
0
uCZ
l
l oj
l COac
J 0
0 E
cCOU
o C tr
0
gc3r
r r
oo000
Ott
r r
00
l
ZM
M M
CrlM
00000
oo
00
Ggg
100VV
C
l V
0 CO
oj t
0 3 r l
2 U5ocogEc ci
t 05 coo
g t3
o 00 E 0 0 G
c A l
V
o
J
cc rol
S S 0 e arooUOJ
r r r r r r000000
000000
oooooo
000000
OO ONNO
r r
M M M r V
00 00 00 00 M
NNNNM
MMMMMM000000
000000
000000
000000
000000
000000
000000
V V V V V V
NNNNNl
000000
o
o rci5505J0tr30cu
0 l
eccoS 2Vn tj0G
c 0roru
r r
00
00
tt
N N
00
r r
00
00
N 1
N N
tt00
O r M
0V r
V r OOMMM700
M M N
MrlMM0000
0000
0000
0000
0000
0000
0000
V V V V
1 N N N
0000
r r r
000
000
N N N
N 1 N
N N N
000
r r r r
0000
0000
N N 1 N
1 N M
NNNN
0000
r r r
000
000
1 N N
M M M
N 1 N
000
r roo
00
N N
M
I N
00
r r
00
00
NN
M
N N
00
7 v 0 t r 00 0 NrVrrNrrrroooooo
M M N N M t M M
00 7 00 00 1 0 N 00 00 00 00 00 00
NMNNNM7MNNNNNNrlMMMMtMMMMMMMM
00000000000000
0000000000000000000000000000
00000000000000
00000000000000
00000000000000
00000000000000
V V V V V V V V V V V V V V
NNNN INNNNNNNNI00000000000000
0 0
CO CO
t CO t
Q l
J5 C Co0cc
Ci 0 0 ci
o oG
0 2
euCOUOOoj
Cd S s
Jlt Jo ol
GGa
oj 0 oj 0 0
lO JuuE
r
r r r r
0000
0000
tttt
M 7 7
tttt0000
r r r
000
000
N N N
V V In
N N N
000
OOM77V 0700000000007
r 7t 7tMr
MV OOV OOOOM
MMNtlNM
MMMMMMM
0000000
0000000
0000000
0000000
0000000
0000000
0000000
V V V V V V V
NNNNNNN
0000000
270
Eo
C
Z
Eo
rr
l
Z
o
Eo
Eo
U
r
o
o
l
rr
o
l
c
f
r
o
o
l 0
VoNCl0
III
C 0
0 Q
00 el
r
o
o
r
o
I
I
I
lo
INN
zzzzzzzzzzzzzzzzzzzzzzz zzzzzzzzzzzz
6
o
V
N
E
ll
J
03050
5
rJ2
80 u
l o wl0r
ZE
l
el
Cl
o
U ll ll
Jl U U
l C CJljjJl
o 0
C
00
0z88u1loo
l 000
zzz
l
0
oU
ll ll ll ll
g g g 2 g
I Ic IenenVVE
o 0 0 0
u
g 8 g 8OOOOOclllllooo60lllllll00000
ZZZUZ
0
OIl U
UClOeajE0
ClC lE
ll ll
U U
c
ll
o
c
o
o
o
0
o
Z
JlJl
j 66
1i2 ze
0 0
E 0
wZ
o
U
Jl
ll
Jl
Jl
o
0
c
3I
o
ei
w
i30
cr
E
17
OUu
0
O20
ll 00
ZE
ll ll
u U
g C C
j j
ll I I
0 Jl Vl
0 1 E
Z tJJ
I 0 0
o l 0 0
oo O oeo o2lll0
J l 0 l 01i1i1ioo1io1i1ioClClClUOClZClClZ
7
tE
r
r
c
l
0j
20 0
Vl 0 0 0ll
6 c j
oooroll
6
I l 0CllVlljOlSUog0arU
r
el
UO 700000 70 VlO r 070000 MO 00 0O7orr777rrrrrNOrV77r7r7ONNNOOOOONNNNNOOONONNONeiOOOvONOONO
ll
C
o
0
elC l
U
3r
l
relo
Qo
ol
l VI
lo
N
zg
M
C rr
00
0
el0 0
Og
10elVl
l NCQo
00
0505 00
2
3 Cl
00CClClS2UraQl
OO O o o
o j
c CO CO 0
2 C c 0 0
g o
I l l 0
uuurr
r r r r r r000000000000
l l l l l l000000
Cl rr N 77rrN700V
V VlN
MNCINMrr
MMMMMM
000000000000000000
000000
000000000000
000000
VI V V V V V
NNNNNC1
000000
0
co
Vl
OO
5
s coco
0 c C
cG 0 0
GIeieilViV1
jrr
r r r
000
000
N N C l
000
V M
00
7r 1
V M VI
M M M
M M M
000
000
000
000
000
000
000
VI VI VI
ClC lN
000
00 0
0
U CI0
lo O
Q I
0 005
Vl
lOQ
0COCO
S c VI
0 oj
Eoj
eil r
r r r
000
000
NNN
r r
l l l000
7
N
r oo
M
MNN
M M M000
000
000
000
000
000
000
V VI VI
NNN
000
0 00
coo 2
Vl l jQ
Q OOuBoo0cIuo
o g
0
uECO I
l Q I V1
Q Q
o g1J
ja UI
r r
00
00
l lrr
l t
00
r r00
00
l lr00
N C l
00
00 7
00
0
M rl
M M
M M
00
00
00
00
00
00
V 0
r M
M 0
M M
M M
00
00
00
00
00
00
0000
VI VI VI VI
NCINN
0000
r
o
o
N
00
l
o
r r r r r00000
00000cllltoooooooo
l l tc l00000
M
rr
N
N
Mo
o
o
o
o
o
OON N0V
rrN V M NNNNCl
Mrr MMM
MMMMM
00000
0000000000
00000
00000
00000
o
V
N
o
00000
V V V V V
NNNCIN00000
o
0 0
05
0 c2lC30c00cZiUI
0 0 0
r E
t
CO c Cl g02gNr
g2
u rr
r r r r0000
0000
l l l t
l l l l
0000
r OV
oooor o
MM
OOOOl f
N N rrM
M M M M
0000
0000
0000
0000
0000
0000
0000
V V V V
NNNN
0000
o
oo
r
J
0
CO
Vl
c
ra
0
jQ
ei
V
o
r
r
o
o
l I
lo
l l
00
M
M
o
o
o
o
o
o
o
V
N
o
271
r
o
o
N
J
Z
00
Z
o
U
r
o
l
2f
r
o
o
N
0
V
o NCI0
VI
u
C I
Q
OJ
r
o
o
N
r
o
CI
zz
w
r
1 bI
s 0
Ituo0ololw
c l l w
U l l
0 0 r
00f
CI
J
o
w
zzzzzzzz
v
g
CI
CI
l
o
6 I
00z
l
J
OO Ool O
l l o
l l l 2J5J5J5u
I
t
I
0
o
0
IOzz
N
N
V
0
zz
5
0ClV
d N
o 0
E
CI EJ
g l
ol 0SU0
Cl CI r11ClCloEcich
zoWEgClClE
00
l 1 o UlCl W11ouJ5J5ZCl
c
1
ol
o
2 Vi
O p l OO
0 U 0 3
ool 6s 99ea
ol a oooClBuu
lV1 OOV Vto5100rUSrUUrr
r r r r r r r r
0000000000000000
OOOl
2
00000000
1 1
0 00
00 0 10 r r 0
M t V t N r
0000 100
NNrlMt N
MMMMMM
000000o00000
000000
000000
000000
000000
t N
r r
N N
N N
MM
M M
00
00
00
00
00
00
t t
OJ CI
rjU5
0 0
o 0c15c15
r
0
o
U
t glSlOO S
iJ00
2 2 gololVi
CI CI
l t tl
O
0 0 0
c 1
l 1 ol
000 1
V Vv00 0
OO Olrr
r r r
000Cooo
O 0 0 0
N N rl
fIJ000
0000
I
ZMtlOO
M N
C Cl M rl
0000
ggg5000
uggg
I888
00000000
V V V V V V V V
NNNNClNCIN
00000000
V V
10 10
00
0 0
c
1
0 0
0 2
2 058ol50
tic05
tl 0 CSVis
o l
O
O U
r
r r r
000000000
M t M
000
C
l
CI
CI
b CI
rl 10 00 Z
oMMM000E
000
OOOE000gggu
l
0000
V V V E
NNN000
272
CITY OF
CHANHASSEN Animal
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
26
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Traffic
Engineering
Phone 952 227 1160
Fax 952 227 1170
29
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Parks
October CSO Highlights
98 Total Calls
Wild animal calls 1
Barking Dog 2
Animal at large 8
Impounds 5
Miscellaneous 10
Personal injury crash 2
Property Damage crash 1
October Comparison
2006
Lock Outs 08
Animal 32
Traffic 48
Code 18
Other 07
Parks n a
Total
2007
Lock Outs 06
Animal 26
Traffic 29
Code 12
Other 14
Parks 17
113 Total 98
Stall Motorist assist 9
Other Traffic 11
Vehicle Lock Out 6
Park Ordinance Enforcement 17
Code Enforcement
Planning
Natural Resources
Phone 952 227 1130
Fax 952227 1110 12
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110 Other
Web Site
WIiW ci chanhassen mn us 14
Junked Vehicle 0
Parking 5
Outdoor Storage 2
Misc 5
Medicals 6
Fire Calls 3
Other 3
Found Property 2
Year To Date
Comparison
2006 2007
Lock Outs 106 Lock Outs 67
Animal 339 Animal 282
Traffic 468 Traffic 352
Code 247 Code 197
Other 281 Other 208
Parks nla Parks 169
Total 1441 Total 1275
The City of Chanhassen A growing community with clean lakes quality schools a channing downtown thriving businesses winding trails and beautiful parks A great place to live work and play273
3
CHANHASSEN FIRE DEPARTMENT
P O Box 97 7610 Laredo Drive Chanhassen MN 55317
Bus Phone 952 227 1200 Minnewashta Station No 2 Phone 952 474 7094
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Gregg Geske Fire Chief
Roger Smallbeck 15t Assistant Chief
Randy Wahl 2nd Assistant Chief 0
Mark Littfin Fire Marshal
DA TE November 19 2007
SUBJ Monthly City Council update
Fire Department Overview
Staffing is at 45 active firefighters as of November 19 2007 allocation is 45 PrE s
As of November 11 2007 we have responded to 504 calls up 57 calls from 447 at this
same time last year We did not have any structure fires since our last council update
We will not have a representative for the council meeting on November 26 At our
December business meeting the Fire Department will be holding elections for Chief and
2nd Assistant Chief positions We will be looking at adding additional firefighters in the
first quarter of 2008
Training This month s training consisted of Ice RescueHypothermia and National Fire
Incident Reporting System entry training
Fire Investigation There are 2 fires to report on First was an outhouse fire at Lake
Susan Park It appears that someone set the outhouse on fire The Fire Department
responded at 2 37 a m There are no suspects at this time The second fire was a reported
stolen vehicle that was discovered on Tuesday November 13 at the South Lotus Lake
boat launch The fire self extinguished and the Fire Department was not called Upon
investigation it was felt that this fire required additional investigation by the insurance
company as a few red flags popped up during the initial inspection by fire investigators
from both the Fire Department and the Sheriff s Department
274
Mr Todd Gerhardt
November 19 2007
Page 2
Fire Education The fire education programs with the 4 schools in Chanhassen and our
annual open house were both very successful this year We received many positive
comments from the schools as well as very favorable comments from the citizens that
attended our open house Even though it was a little cooler than it past years we still had
a great turnout and everyone had a great time including our firefighters
Fire Inspections
Existing Structure Inspections Staff inspected the Chanhassen Village Apartments Lake
Susan Apartments Centennial Hill Apartments and Chan Haven Apartments
New Construction Inspections at various stages Staff inspected the Chanhassen High
School Dell Professional Building Life Time Fitness Office Buildings 1 and 2 Mamac
Industries Autobahn Motorplex SouthWest Village parking ramp and numerous Town
and Country apartment homes and townhouses
275
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952227 1100
Fax 952 227 1110
Building Inspections
Phone 952227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952227 1110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952227 1110
Web Site
www ci chanhassen mn us
4
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Sharmeen AI Jaff Senior Planner
DA TE November 26 2007
SUBJ Amendment to Conditional Use Permit and Site Plan
Review to allow a 145 foot Telecommunication Tower with
a 4 foot lightning rod and a 6 foot high fence 6
T Mobile USA Planning Case No 07 04
EXECUTIVE SUMMARY
On April 9 2007 the City Council approved the Conditional Use Permit and Site
Plan Permit for the cell tower Since that meeting compliance with the National
Historic Preservation act required the relocation of the cell tower Thus another
public hearing was required
The applicant is requesting a conditional use permit and site plan approval for the
construction of a 145 foot monopole communication tower with a 4 foot lightning
rod and a 6 foot high fence The request was reviewed and recommended for
approval by the Planning Commission on November 6 2007
ACTION REQUIRED
City Council approval requires a two thirds vote of City Council present
PLANNING COMMISSION SUMMARY
The Planning Commission held a public hearing on November 6 2007 to review
the proposed development The Planning Commission voted 6 to 1 to approve the
proposed development The summary and verbatim minutes are item la of this
agenda packet
Commissioner Dan Keefe offered the following comments as reasons for his denial
recommendation
I Conditional Use Findings
The applicant did not meet 3 of the 12 general issuance standards of
conditional use Section 20 232 Items 3 8 9 are clearly violated by the
construction of a 145 foot cell tower The design is not compatible with
the existing or intended character of the general vicinity It will result in
the degradation of historic features of major significance and will not be
aesthetically compatible with the area
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play276
Todd Gerhardt
T Mobile Cell Tower
Planning Case 07 04
November 26 2007
Page 2
Response
The referenced sections of the ordinance are
3 Will be designed constructed operated and maintained so to be compatible in
appearance with the existing or intended character of the general vicinity and will not
change the essential character of that area
8 Will not result in the destruction loss or damage of solar access natural scenic or
historic features of major significance
9 Will be aesthetically compatible with the area
Staff forwarded this request to the Minnesota Historical Society State Historic
Preservation Office Britta Bloomberg Deputy State Historic Preservation Officer stated
in a memo dated October 17 2007 On the basis of the infonnation in your submittal we
conclude that construction of the project at the revised location would have no adverse
effect on historic properties including the Vogel House No further Section 106 review
for this site is needed As to the appearance of the tower staff recommended the
monopole color shall be the brand Tnemac and the color Blue Elusion This will
allow the monopole to blend in The Chanhassen City Code indicates that this use is
appropriate subject to review and compliance with the Towers and Antennas ordinance
2 Technological Obsolescence
This cell tower is proposed to be on a lease for 30 years The need for the tower will
likely be less than 5 years due to technology change The future of cellular technology is
in short base stations or antennas on 2 3 story buildings and utility poles not on 145 foot
metal giants Chanhassen will be stuck with an obsolete eyesore for 25 years And does
anybody think T Mobile will be around 30 years from now to take it down
Commissioner Keefe attached a link to a web site for review and understanding the future
of cell towers
Response Towers and Antennas are currently permitted in the City of Chanhassen subject
to conditions Until such time as a provider offers the service the city must accommodate
towers and antennas Under Federal Law the local government is preempted from
unreasonable interference
3 Who benefits
I would wager 90 of the beneficiaries of the tower reside outside of the City of
Chanhassen These include T Mobile and drivers from other cities along 101 and
Pioneer Trail Halla will also get a nice lease on their commercial property but
Chanhassen won t get any of the lease dollars Even though T Mobile purports to have a
coverage issue the residents in the area they want to cover don t want it This project
primarily benefits people outside of Chanhassen
277
Todd Gerhardt
T Mobile Cell Tower
Planning Case 07 04
November 26 2007
Page 3
Response Under Federal Law the local government is preempted from unreasonable
interference in the provision of wireless communication services The applicant complies with
the established regulations and ordinances in the City Code
Federal Guidelines for Local and State Government Authority over the Siting of Personal
Wireless Service Facilities
Section 332 c 7 of the Communications Act preserves state and local authority over zoning and
land use decisions for personal wireless service facilities but sets forth specific limitations on
that authority Specifically a state or local government may not unreasonably discriminate
among providers of functionally equivalent services may not regulate in a manner that prohibits
or has the effect of prohibiting the provision of personal wireless services must act on
applications within a reasonable period of time and must make any denial of an application in
writing supported by substantial evidence in a written record The statute also preempts local
decisions premised directly or indirectly on the environmental effects of radio frequency RF
emissions assuming that the provider is in compliance with the Commission s RF rules
RECOMMENDATION
Staff and the Planning Commission recommend adoption of the motions approving the site plan
and conditional use permits to allow a 145 foot Telecommunication Tower with a 4 foot
lightning rod and a 6 foot high fence beginning on page 16 of the staff report dated November
16 2007 for Planning Case 07 04 for T Mobile USA with conditions
A TTACHMENTS
1 Planning Commission Staff Report dated November 6 2007
g plan2007 planning cases 07 04 t mobile IO 5 07 application executive summary doc
278
z
u
00
PC DATE November 6 2007 lCCDATENovember262007
CITY OF CHANHASSEN REVIEW DEADLINE December 3 2007
CASE 07 04
BY AI Jaff et al
STAFF REPORT
PROPOSAL Amendment to Conditional Use Permit and Site Plan Review to allow a 145
foot Telecommunication Tower with a 4 foot lightning rod and a 6 foot
fence
LOCATION Outlot A Halla Maryanne Addition located west of Great Plains Boulevard
north of Creek wood Drive south of Halla Nursery and east of Bluff Creek Golf
Course
APPLICANT T Mobile USA
8000 West 78th Street f
Suite 400
Edina MN 55419
612 702 5065
Contact Stephen Edwards
smedwards24 yahoo com
PRESENT ZONING A 2 Agricultural Estate District
2020 LAND USE PLAN Residential Large Lot 2 5 Acre Minimum 1110 acre outside of MUSA
ACREAGE 12 acres DENSITY
SUMMARY OF REQUEST Conditional use permit and site plan approval for the
construction of a 145 foot monopole communication tower with a 4 foot lightning rod and a 6
foot high fence Notice of this public hearing has been mailed to all property owners within 500
feet Staff is recommending approval of the request
LEVEL OF CITY DISCRETION IN DECISION MAKING
The City s discretion in approving or denying a site plan is limited to whether or not the proposed
project complies with Zoning Ordinance requirements If it meets these standards the City must
then approve the site plan This is a quasi judicial decision
The City has limited discretion in approving or denying conditional use permits based on
whether or not the proposal meets the conditional use permit standards outlined in the Zoning
Ordinance
If the City finds that all the applicable conditional use permit standards are met the permit must
be approved This is a quasi judicial decision
J
279
l
I
T Mobile USA
Planning Case 07 04
November 6 2007
Page 2 of 18
INFORMATION
On April 9 2007 the City Council approved a Conditional Use Permit and Site Plan Permit 07
04 for a 149 foot telecommunication tower and a 6 foot privacy fence located west of Great Plains
Boulevard north of Creekwood Drive south of Halla Nursery and east of Bluff Creek Golf
Course Outlot A Halla Maryanne Addition
Cellular towers are regulated and licensed by the Federal Communication Commission FCC
and must comply with Section 106 of the National Historic Preservation Act NHP A Section
106 of the NHPA requires Federal agencies to take into account the effects of their undertakings
on historic properties and afford the Advisory Council on Historic Preservation ACHP a
reasonable opportunity to comment
The property located at 10151 Great Plains Boulevard has historic value The structure was built
in 1872 by August and Maria Vogel one of the first settlers in Chanhassen The State Historic
Preservation Office was consulted on the impact of the cellular tower on the Vogel House
280
T Mobile USA
Planning Case 07 04
November 6 2007
Page 3 of 18
On August 2 2007 T Mobile used a crane simulating a cell tower to assess the impact on the
historic property The crane was positioned as close to the proposed tower center as possible and
the boom was extended to 145 feet I
height of proposed tower The crane
boom was then viewed from several
vantage points on the Vogel Property
and from inside the house
The crane was moved approximately
175 200 feet westnorthwest of
proposed location and again extended
to the proposed tower height of 145 feet
View of cr Ule Jt LoctlOl 1 locking frollllh bJck doOl of the Vogel HOXe
The Minnesota Historical
Society State Historic Preservation
Office concluded that the tower
installation would introduce a visual
element that would diminish the
historical integrity of the setting and
feeling of the Vogel House and the
land parcel upon which it is situated
I
281
T Mobile USA
Planning Case 07 04
November 6 2007
Page 4 of 18
The following are photos taken from 10151 Great Plains Boulevard They are comparisons
between the views when the crane was located at the previously approved location location 1
and the new proposed location location 2
r I
f i E i i i t
I
View of Location 2 taken froIllnorth property line
I t I
View of Location I from front of House View of Location I from Front of Vogel house
282
T Mobile USA
Planning Case 07 04
November 6 2007
Page 5 of 18
View of Location 2 taken from south driveway
View of Location 2 taken from front yard
It was concluded that the tower must be moved Staff informed the applicant that moving the
tower will require site plan and conditional use permit amendments The applicant resubmitted
the application The new tower location was shifted approximately 500 feet to the west All
other aspects of the application remain the same
PROPOSAL SUMMARY
The applicant is requesting a conditional use permit and site plan approval for the construction of
a 145 foot monopole communication tower with a 4 foot lightning rod and a 6 foot high fence
The tower is proposed to be situated south of Halla Nursery west of Highway 101 north of
Creekwood Drive and east of Bluff Creek Golf Course
283
T Mobile USA
Planning Case 07 04
November 6 2007
Page 6 of 18
iCQAcn
A total of six directional antennas will be mounted in a triangular configuration at the top of the
tower The number of directional antennas has the potential of increasing up to twelve Three
equipment cabinets measuring approximately 6 high x 4 wide x 4 deep are proposed to be
located within a fenced area at the base of the tower The applicant is showing three potential
future equipment cabinets in addition to the three proposed cabinets
Some landscaping is proposed around the fence These plantings are added around the
perimeter of the leased site to soften the look of the base of the tower and fence There are also
some existing mature trees The tower will be placed among the stand of trees
The proposed 6 foot high cedar fence will screen the base of the tower Access to the tower is
provided via a driveway off of Creekwood Drive Staff is recommending approval with
conditions
284
T Mobile USA
Planning Case 07 04
November 6 2007
Page 7 of 18
BACKGROUND
Halla Nursery is a legal non conforming use located north of the subject site In 1997 the City
reached an agreement regarding the scope of Halla Nursery Stipulation for Entry of Judgment It
listed conditions for the continuation of the use as ordered by the court The judgment included a
list of existing buildings and uses These buildings and uses were limited to the Halla Nursery site
Section 20 72 a of the City Code prohibits expansion of non conforming uses During review of
the T Mobile application staff noticed storage of equipment and expanded parking area from the
Halla Nursery onto Outlot A This prompted staffto examine aerial photography of the subject site
The expansion took place between the years 2000 and 2002 Aerials from the year 2000 show trees
and green space while aerials from the year 2002 show expanded parking and storage of
equipment Staff is recommending the expansion be eliminated and the area restored to the limits of
the parking area shown in the aerials from the Year 2000
1 I r
Li
I l
1 1 I
t i ioJI1f1rto
II I j I
J It r I
t
Close up of Halla Nursery Expansion into Outlot A
285
T Mobile USA
Planning Case 07 04
November 6 2007
Page 8 of 18
GENERAL CONDITIONAL USE PERMIT AND SITE PLAN
The applicant is requesting a conditional use permit and a site plan review to construct a 145 foot
monopole tower for wireless communication services and a 4 foot lightning rod The City s
Zoning Ordinance allows telecommunication towers and antennas in Agricultural Estate Districts
subject to the approval of a conditional use permit by the City Council In reviewing conditional
use permit requests the Planning Commission must consider possible adverse affects of the use
The standards are
The City of Chanhassen finds it necessary for the promotion and preservation of the public
health safety welfare and aesthetics ofthe community that the construction location size and
maintenance of wireless telecommunication facilities be controlled Further the City finds
6 Towers and antennas have a direct impact on and a relationship to the image of the
community
7 The manner of installation location and maintenance of towers and antennas affects the
public health safety welfare and aesthetics of the community
8 A reasonable opportunity for the establishment of wireless telecommunication must be
provided to serve residential and business needs and
9 Uncontrolled and unlimited towers and antennas adversely impact the image and aesthetics
of the community and thereby undermine economic value and growth
The following constitutes our findings
A 145 foot high
tower with a 4
foot lightning
rod at this
location should
not be injurious
to the use and
enjoyment of
surrounding
property or
substantiall y
diminish
property values
as the proposed
tower is over
230 feet from
any existing
residence It is
separated by
roads and existing vegetation Further the proposed tower should not endanger the public health
or safety if the conditions attached to the permit and building code requirements are adhered to
In locating a telecommunication antenna the applicant must demonstrate that the antenna cannot
be accommodated on an existing or approved tower or building within a on mile search radius
286
T Mobile USA
Planning Case 07 04
November 6 2007
Page 9 of 18
Bandimere Park is located within the one mile radius and contains a fire siren pole The pole is
35 feet high The City is considering increasing the height of the pole Staff asked the applicant
to conduct a study that will determine how high the tower should be to meet the needs ofT
Mobile coverage The study concluded that the tower must have a height between 140 and 145
feet
The applicant is requesting approval to erect a monopole tower because there are no existing
structures of adequate height in this portion of the City They have a service deficiency covering
this area of the City
287
T Mobile USA
Planning Case 07 04
November 6 2007
Pagel00f18
Staff instructed the applicant to provide images showing the tower in the proposed location The
following are images prepared by the applicant
r
for
I
1
E
FtlZ DSofYI1
c
II
11 i lI
I
J
288
T Mobile USA
Planning Case 07 04
November 6 2007
Page 11 of 18
City Code requires new antenna support structures to be designed to accommodate additional
users Providing opportunities for co location is important if the total number of towers in the
City is to be kept to a minimum To ensure the possibility of co location in the future the
applicant has submitted a letter of intent committing the tower owner to allow the shared use of
the tower The City also received a letter from Cingular confirming the intention to co locate on
this tower The applicant shall submit documentation at the time of building permit application
showing the height above grade for all potential mounting positions for co located antennas and
the minimum separation distances between antennas A description of the tower s capacity
including the number and type of antennas that it can accommodate should also be provided
Additional antennas would be approved administratively through the building permit process
Accessory structures located with the tower include
a pre assembled base transceiver station BTS that
would be located at the base of the tower The BTS
is a cabinet type structure that contains the radio
frequency transceivers computer and climate
control equipment and batteries for back up power
As additional directional antennas are needed
additional BTS will be required The applicant is
showing three proposed and three future cabinets to
accommodate future expansion of the service The
cable that connects the BTS to the antennas runs
inside the monopole
Staff finds that the applicant has met the general standards for all conditional uses and the design
standards for towers The applicant is proposing to erect a six foot high cedar fence around the
tower and ground equipment This will add to the security and screening of the base ofthe tower
and accessory structures Staff is recommending approval of the 6 foot fence
To reduce the visual impacts of the tower on properties farther from the site the tower color shall
utilize the brand Tnemac and the color Blue Elusion and will contain no artificial lighting or
slgnage
PARKING INTERIOR CIRCULATION
No parking is proposed The plans show a vehicle turnaround area The applicant expects one
vehicle per month to visit the site for maintenance purposes No parking is required by
ordinance
ACCESS
The applicant is proposing to enter the site from an existing field access point off of Creekwood
Drive The length of the driveway will exceed 800 feet Staff is of the opinion that the entrance
should be from the Nursery This will shorten the length of the driveway substantially The
owner of the Nursery prefers a separate access for the tower than the Nursery The driveway will
be used to access the tower and equipment The applicant has indicated that the site will
generate one trip per month
289
T Mobile USA
Planning Case 07 04
November 6 2007
Page 12 of 18
HIGHWAY 101
The City of Chanhassen in conjunction with
Carver County and the Minnesota Department
of Transportation has initiated a study to
identify deficiencies and improvements
necessary for a two lane 3 3 mile segment of
the Highway 101 Corridor in Chanhassen The
project limits are Lyman Boulevard County
State Aid Highway CSAH 18 on the north and
the Scott County Line on the south The
intersection ofMN Highway 101 and Pioneer
TrailCSAH 14 has recently 2005 been
widened and signalized
The objective of this study is to develop and
evaluate alternatives to preserve the long term
safety capacity and mobility of the 3 3 mile
MN Highway 101 Corridor in Chanhassen
Several alignments are being evaluated For the
purpose of this application staff will focus on
the section of the highway located immediately
east of Outlot A subject site One of the
alignments which is the preferred alignment
moves the highway approximately 100 feet to
the west of the existing alignment The current
proposed location of the tower is 150 feet west
of existing Highway 101 City Code allows the
tower to be located at a distance half their
height from a public right of way The tower is
proposed to be located approximately 800 feet
west of the preferred alignment
1J
r I
J 1
I i
rw I Lvm n UI d
Ld 1 r i y J
I r I
J 1
I
J
Gtudy L 1
z Corridor
I
J
iI i I0Irj1
T
o
S
t
I
9 1
GTII
I
3
1 l JcjIO
1 N
Future preliminary engineering plans and
detailed environmental studies will be
completed for alternatives determined to be
feasible and reasonable as a primary outcome
of the study The study will include
recommendations for further development of Existing AligmllE nt IiiiiEI
concept level improvements project staging and Potential New AIi Ullellt cJ
estimated construction costs The study will
address tasks needed to refine roadway designs and determine appropriate future Federal State
and local environmental review and permitting processes
290
T Mobile USA
Planning Case 07 04
November 6 2007
Page 13 of 18
LANDSCAPING
The proposed telecommunications tower is situated among existing vegetation and attempts to
reduce tree and vegetation removal as much as possible Its placement will allow the majority of
vegetation to remain and thereby help to screen the ground equipment and fence The applicant
has provided eight Black Hills spruce for landscape screening of the base
LIGHTING
Lighting is not shown on the site plan Towers shall not be illuminated by artificial means and
shall not display strobe lights unless such lighting is specifically required by the Federal Aviation
Administration or other federal or state authority for a particular tower
SIGNAGE
The applicant has not shown any signage plans No signage advertising or identification of any
kind intended to be visible from the ground or other structures is permitted except applicable
warning and equipment information signage required by the manufacturer or by Federal State
or local authorities
GRADING DRAINAGE
The proposed access at Creekwood drive is consistent with the original plan The original plan
included a 780 foot long driveway to the pad that did not require any grading
The current proposal includes a 780 foot long driveway which requires some grading near the
lease area The current driveway grades near the pad are up to 20 the area should be graded so
that the maximum grade does not exceed 5
MISCELLANEOUS
The contractor shall meet with the Inspections Division as early as possible to discuss plan
review and permit procedures
COMPLIANCE TABLE lOP DISTRICT
Ordinance Proposed
Tower Height 150 feet 149 feet including a 4 foot lightning rod
Tower Setback N 150 E 75
S 150 W 150
N 150 E 800
S 150 W 150
Variances Required None
I
291
T Mobile USA
Planning Case 07 04
November 6 2007
Page 14 of 18
Highway 101 is proposed to be realigned The preferred alignment will shift the highway
approximately 100 feet closer to the tower Section 20 1505 Setbacks 4 of the city code
states Towers shall be set backfrom all planned public rights of way by a minimum
distance equal to one half of the height of the tower including all antennas and
attachments The tower will remain in conformance when the Highway is realigned
FINDINGS
Site Plan Findings
In evaluating a site plan and building plan the City shall consider the developments compliance
with the following
1 Consistency with the elements and objectives of the city s development guides including the
comprehensive plan official road mapping and other plans that may be adopted
2 Consistency with this division
3 Preservation of the site in its natural state to the extent practicable by minimizing tree and
soil removal and designing grade changes to be in keeping with the general appearance of the
neighboring developed or developing areas
4 Creation of a harmonious relationship of building and open space with natural site features
and with existing and future buildings having a visual relationship to the development
5 Creation of functional and harmonious design for structures and site features with special
attention to the following
a An internal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants visitors and general community
b The amount and location of open space and landscaping
c Materials textures colors and details of construction as an expression of the design
concept and the compatibility of the same with adjacent and neighboring structures and
uses and
d Vehicular and pedestrian circulation including walkways interior drives and parking in
terms of location and number of access points to the public streets width of interior
drives and access points general interior circulation separation of pedestrian and
vehicular traffic and arrangement and amount of parking
6 Protection of adjacent and neighboring properties through reasonable provision for surface
water drainage sound and sight buffers preservation of views light and air and those aspects
of design not adequately covered by other regulations which may have substantial effects on
neighboring land uses
292
I
T Mobile USA
Planning Case 07 04
November 6 2007
Page 150f18
Finding The proposed development is consistent with the design requirements the
comprehensive plan the zoning ordinance and the site plan review requirements The site
design is compatible with its surroundings It is functional
Conditional Use Permit Findings
When approving a conditional use permit the City must determine the capability of a proposed
development with existing and proposed uses The general issuance standards of the conditional
use Section 20 232 include the following 12 items
1 Will not be detrimental to or endanger the public health safety comfort convenience or general
welfare of the neighborhood or the city
Finding The proposed tower will provide a basic utility to the area
2 Will be consistent with the objectives ofthe city s comprehensive plan and this chapter
Finding The proposed use is consistent with the city s comprehensive plan and generally
complies with city ordinance requirements
3 Will be designed constructed operated and maintained so to be compatible in appearance with
the existing or intended character of the general vicinity and will not change the essential
character ofthat area
Finding The proposed tower complies with city ordinance requirements The lower portion
ofthe tower including the equipment will be screened by vegetation and a fence Staff is
recommending the tower be painted a color that will allow it to blend into the sky
4 Will not be hazardous or disturbing to existing or planned neighboring uses
Finding The proposed tower will not be hazardous to existing or planned neighboring uses
5 Will be served adequately by essential public facilities and services including streets police and
fire protection drainage structures refuse disposal water and sewer systems and schools or
will be served adequately by such facilities and services provided by the persons or agencies
responsible for the establishment of the proposed use
Finding Will be served adequately by facilities and services provided by the persons
responsible for the establishment ofthe proposed use
6 Will not create excessive requirements for public facilities and services and will not be
detrimental to the economic welfare ofthe community
Finding Will not create excessive requirements for public facilities and services and will not be
detrimental to the economic welfare of the community It will provide a necessary utility
293
T Mobile USA
Planning Case 07 04
November 6 2007
Page 16 of 18
6 Will not involve uses activities processes materials equipment and conditions of operation
that will be detrimental to any persons property or the general welfare because of excessive
production of traffic noise smoke fumes glare odors rodents or trash
Finding The proposed tower should not create conditions that are detrimental to persons
property or the general welfare of the community
7 Will have vehicular approaches to the property which do not create traffic congestion or
interfere with traffic or surrounding public thoroughfares
Finding The proposed development will not interfere with traffic circulation
8 Will not result in the destruction loss or damage of solar access natural scenic or historic
features of major significance
Finding The proposed development will not destroy or damage natural scenic or historic
features
9 Will be aesthetically compatible with the area
Finding The proposed tower will be aesthetically compatible with the area
10 Will not depreciate surrounding property values
Finding The proposed development should not depreciate surrounding property values
11 Will meet standards prescribed for certain uses as provided in this article
Finding The proposed development will meet standards established for communication towers
STAFF RECOMMENDATION
Staff and the Planning Commission recommends that tfl0 City Council PlaRRiRg CJmmigsi lR
adopt the following motions
Site Plan Review
The PlaRRiRg CJmmiggi lR City Council f@8Jmm@R lg a rJ al lf approves the Amendment to
Site Plan Permit 07 04 for a 149 foot telecommunication tower and a 6 foot cedar fence as
shown on the site plan received October 5 2007 subject to the following conditions
1 The applicant shall enter into a site plan agreement and submit financial security to guarantee
the improvements
2 Clearing for the tower and equipment pad shall be no greater than 15 feet from the edge of
the pad
294
T Mobile USA
Planning Case 07 04
November 6 2007
Page 17 of 18
3 A maximum of 25 feet is allowed for clearing the access road to the site Trees shall be
preserved to the greatest extent possible
4 The applicant shall install a minimum of eight Black Hills spruce around the equipment
platform Trees shall be at least six feet in height
5 Site grading and vegetation removal shall be minimized to the greatest extent practical If
any excess material is anticipated to be generated as a result of access road construction the
disposal location must be approved in writing by City staff prior to road construction
6 A rock construction entrance complying with the City s standard detail 5301 shall be
included on the Erosion and Grading Plan and shall be constructed prior to the remainder of
the gravel road
7 If applicable the applicant shall apply for and obtain permits from the appropriate regulatory
agencies e g Riley Purgatory Bluff Creek Watershed District Minnesota Pollution Control
Agency and comply with their conditions of approval Watershed district and MPCA permits
are necessary if the total disturbed area is in excess of 1 0 acres
8 The current driveway grades near the pad are up to 20 the area should be graded so that
the maximum grade does not exceed 5
9 The driveway off of Creekwood Drive may not be used to serve nor access the Halla Nursery
commercial operation
10 Building Official Conditions
a A building permit is required to construct the platform and tower the tower must be
designed for an 100 MPH 3 second gust wind load and include the effect of one half inch
of radial ice
b The plans must be signed by a professional engineer licensed in the State of Minnesota
c The contractor shall meet with the Inspections Division as early as possible to discuss
plan review and permit procedures
Conditional Use Permit
The Phumiflg Clmmi8si lfl City Council Feelmmefl ls a rl al lf approves the Amendment to
Conditional Use Permit 07 04 for a 149 foot telecommunication tower as shown on the site
plan received October 5 2007 subject to the following conditions
1 The applicant shall enter into a conditional use permit agreement and submit financial
security to guarantee the improvements
2 The tower shall comply with the requirements in ARTICLE XXX TOWERS AND
ANTENNAS of the Zoning Ordinance
295
T Mobile USA
Planning Case 07 04
November 6 2007
Page 18 of 18
3 The tower shall not be illuminated by artificial means and shall not display strobe lights
unless such lighting is specifically required by the Federal Aviation Administration or other
federal or state authority for a particular tower
4 No signage advertising or identification of any kind intended to be visible from the ground
or other structures is permitted except applicable warning and equipment information
signage required by the manufacturer or by Federal State or local authorities
5 The applicant shall submit documentation at the time of building permit application showing
the height above grade for all potential mounting positions for co located antennas and the
minimum separation distances between antennas A description of the tower s capacity
including the number and type of antennas that can be accommodated should also be
provided
6 The monopole color shall be the brand Tnemac and the color Blue Elusion
7 All outdoor storage associated with the Halla Nursery and located within Outlot A Halla
Maryanne Addition shall be removed prior to issuance of a building permit for the tower and
the area shall be revegetated
A TTACHMENTS
1 Findings of Fact
2 Application
3 Letter from applicant dated October 5 2007
4 Letter from Peter J Coyle dated October 4 2007
5 Co location letter from Don Halla dated September 12 2006 received October 5 2007
6 Letter from Britta L Bloomberg dated September 5 2007
7 Letter from Britta L Bloomberg dated October 17 2007
8 T Mobile coverage information
9 Affidavit of Mailing and Property Owners List
10 Reduced Copy of Plans received October 5 2007
g plan2007 planning cases 07 04 l mobile 1 0 5 07 applicationstaff reportdoc
296
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
INRE
Application of T Mobile to amend a Conditional Use Permit 2007 04 and Site Plan approval for
a 145 foot Telecommunication Tower with a 4 foot lightning rod
On November 6 2007 the Chanhassen Planning Commission met at its regularly scheduled
meeting to consider the application of T Mobile for a conditional use permit amendment and site
plan amendment approval for the property legally described as Outlot A Halla Maryanne
Addition located west of Great Plains Boulevard north of Creekwood Drive south of Halla
Nursery and east of Bluff Creek Golf Course The Planning Commission conducted a public
hearing on the proposed amendment to conditional use and site plan that was preceded by
published and mailed notice The Planning Commission heard testimony from all interested
persons wishing to speak and now makes the following
FINDINGS OF FACT
1 The property is cUITently zoned A 2 Agricultural Estate District
2 The property is guided by the Land Use Plan for Residential Large Lot 2 5 Acre Minimum
1 10 acre outside of MUSA
3 The legal description of the property is Outlot A Halla Maryanne Addition
4 Section 20 232
a Will not be detrimental to or enhance the public health safety comfort convenience or
general welfare of the neighborhood or the city
b Will be consistent with the objectives of the city s comprehensive plan and this chapter
c Will be designed constructed operated and maintained so to be compatible in
appearance with the existing or intended character of the general vicinity and will not
change the essential character of that area
d Will not be hazardous or disturbing to existing or planned neighboring uses
e Will be served adequately by essential public facilities and services including streets
police and fire protection drainage structures refuse disposal water and sewer systems
and schools or will be served adequately by such facilities and services provided by the
persons or agencies responsible for the establishment of the proposed use
297
f Will not create excessive requirements for public facilities and services and will not be
detrimental to the economic welfare of the community
g Will not involve uses activities processes materials equipment and conditions of
operation that will be detrimental to any persons property or the general welfare because
of excessive production of traffic noise smoke fumes glare odors rodents or trash
h Will have vehicular approaches to the property which do not create traffic congestion or
interfere with traffic or sUlTounding public thoroughfares
I Will not result in the destruction loss or damage of solar access natural scenic or
historic features of major significance
J Will be aesthetically compatible with the area
k Will not depreciate surrounding property values
1 Will meet standards prescribed for certain uses as provided in this article
5 Section 20 110
a Consistency with the elements and objectives of the city s development guides including
the comprehensive plan official road mapping and other plans that may be adopted
b Consistency with this division
c Preservation of the site in its natural state to the extent practicable by minimizing tree and
soil removal and designing grade changes to be in keeping with the general appearance of
the neighboring developed or developing areas
d Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development
e Creation of functional and harmonious design for structures and site features with special
attention to the following
1 An intemal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants visitors and general community
2 The amount and location of open space and landscaping
3 Materials textures colors and details of construction as an expression of the design
concept and the compatibility of the same with adjacent and neighboring structures
and uses and
4 Vehicular and pedestrian circulation including walkways interior drives and parking
in terms of location and number of access points to the public streets width of interior
2
298
drives and access points general interior circulation separation of pedestrian and
vehicular traffic and arrangement and amount of parking
f Protection of adjacent and neighboring properties through reasonable provision for
surface water drainage sound and sight buffers preservation of views light and air and
those aspects of design not adequately covered by other regulations which may have
substantial effects on neighboring land uses
6 The planning report 2007 04 dated November 6 2007 prepared by Sharmin AI Jaff is
incorporated herein
RECOMMENDA TION
The Planning Commission recommends that the City Council approve the amended
conditional use permit and site plan
ADOPTED by the Chanhassen Planning Commission this 6th day of November 2007
CHANHASSEN PLANNING COMMISSION
BY
Its Chairman
3
299
Planning Case No Ol Otf
CITY OF CHANHASSEN
7700 Market Boulevard P O Box 147
Chanhassen MN 55317 952 227 1100
CITY OF CHANHASSEN
RECEIVED
OCT 0 5 2007
DEVELOPMENT REVIEW APPLICATION CHANHASSEN PLANNING DEPT
PLEASE PRINT
Applicant Name and Address
rrv1c6lL LJs A
P 1 Wd CS d SU L fo
r IYl IYl f L t q
Contact SkcJe CduArnts
Phone 12 lD2 5aClo Fax 12 6116c3b
Email SVoeol ols Q V cDtY
Owner Name and Address
t c 0
lo an r lc oI S 1l
c c c mN SO CO
Contact IQ
Phone QS2CNl 2 Fax
Email
NOTE Consultation with City staff is reauired prior to submittal including review of development
plans
Comprehensive Plan Amendment
t Conditional Use Permit CUP Lf 25
Interim Use Permit IUP
Non conforming Use Permit
Planned Unit Development
Rezoning
Sign Permits
Sign Plan Review
x Site Plan Review SPR SOO
Temporary Sales Permit
Vacation of Right of Way Easements VAC
Variance VAR
Wetland Alteration Permit WAP
Zoning Appeal
Zoning Ordinance Amendment
X Notification Sign I2OQ
City to install and remove
Subdivision
X Escrow for Filing Fees Attorney Cost
50 CUP SPRNACNARlWAP Metes Bounds
450 Minor SUB
TOTAL FEE
An additional fee of 3 00 per address within the public hearing notification area will be invoiced to the applicant
prior to the public hearing
Sixteen 16 full size folded copies of the plans must be submitted including an 8 X 11
reduced copy for each plan sheet along with a diaital COpy in TIFF Group 4 tif format
Escrow will be required for other applications through the development contract
Building material samples must be submitted with site plan reviews
NOTE When multiple applications are processed the appropriate fee shall be charged for
each application
SCANNED300
PROJECT NAME fX O Un
LOCATION Sl o X r P Q s L1
LEGAL DESCRIPTION l t C lto plc
TOTAL ACREAGE 2 cJh
WETLANDS PRESENT YES K NO
PRESENT ZONING A q ttcU snd
REQUESTED ZONING N0 Cho f
PRESENT LAND USE DESIGNATION AQ
REQUESTED LAND USE DESIGNATION r rJ xx A p l
REASON FOR REQUEST 7ro 0 4 C k Cw Ld0
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions Before filing this application you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application
A determination of completeness of the application shall be made within 15 business days of application submittal A written
notice of application deficiencies shall be mailed to the applicant within 15 business days of application
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application I have attached a copy of proof of ownership
either copy of Owners Duplicate Certificate of Title Abstract of Title or purchase agreement or I am the authorized person
to make this application and the fee owner has also signed this application
I will keep myself informed of the deadlines for submission of material and the progress of this application I further
understand that additional fees may be charged for consulting fees feasibility studies etc with an estimate prior to any
authorization to proceed with the study The documents and information I have submitted are true and correct to the best of
my knowledge
2 L
Signature oLApplicant
liJ
Signature of Fee Owner
10 3 07
Date
t SCANNED
G pLAN forms Development Review Application DOC Rev 12 05301
CITY OF CHANHASSEN
RECEIVED
OCT 0 5 2007
CHANHASSEN PLANNING DEPT
Sec 20 109 Applications
Application for a site plan review shall be made to the city planner on forms
provided by the city and shall be filed 30 days in advance of the planning commission
meeting at which it is to be considered Incomplete or deficient applications shall not be
scheduled for a meeting unless the community development director has determined
that official action is warranted The application shall also include
1 Evidence of ownership or an interest in the property
The memorandum of Lease Agreement is included in the application
2 The application fee and
Included with the application
3 Complete site plans signed by a registered architect civil engineer landscape
architect or other design professional to include the following
Mike Hatchy Saint Croix Engineering License Number 17852
4 General
a Name of project
A 1 P0902 Halla
b Name address and telephone number of applicant engineer and owner of record
Designer Chris Miller T Mobile Engineer Mike Hatchy Saint Croix Engineering
c Legal description certificate of survey will be required
Halla Maryanna Addition Out lot A
d Date proposed north arrow engineering scale number of sheets name of drawer
Please see construction drawings
e Vicinity map showing relationship of the proposed development to surrounding
streets rights of way easements and natural features
Please see Carver GIS Map included in the application
f Description of intended use of the site buildings and structures including type of
occupancy and estimated occupancy load
Please see application cover letter No building proposed zero occupancy
g Existing zoning and land use
Agriculture Estate No existing land use
h Tabulation box indicating
1 Size of parcel in acres and square feet 124 acres Approximately 552 720sf
2 Gross floor area of each building Not Applicable
3 Percent of site covered by building Not Applicable With tower and equipment less
than 1
4 Percent of site covered by impervious surface With tower and equipment less than
1
SCANNED
302
5 Percent of site covered by parking area Less then 1
6 Projected number of employees Zero
7 Number of seats if intended use is a restaurant or place of assembly Zero
8 Number of parking spaces required One
9 Number of parking spaces provided including handicapped Zero
10 Height of all buildings and structures and number of stories Not Applicable
11 Breakdown of the building area allocated for specific uses e g manufacturing
office retail showroom warehouse etc Not Applicable
5 Site and building plan
a Property line dimensions location of all existing and proposed structures with
distance from boundaries distance between structures building dimensions and floor
elevations Please see construction drawings
b Grading and drainage plans showing existing natural features topography wetlands
vegetation etc as well as proposed grade elevations and sedimentation and
stormwater retention ponds Plans shall include runoff and storage calculations for ten
year and 1 OO year events If stormwater is proposed to be routed to existing stormwater
ponds documentation shall be provided to demonstrate that the downstream pond is
sufficient to accommodate the additional stormwater Not Applicable
c All existing and proposed points of egress ingress showing widths at property lines
turning radii abutting rights of way with indicated centerline width paving width existing
and proposed median cuts and intersections of streets and driveways Please see
construction drawings
d Vehicular circulation system showing location and dimension for all driveways
parking spaces parking lot aisles service roads loading areas fire lanes emergency
access if necessary public and private streets alleys sidewalks bike paths direction
of traffic flow and traffic control devices Please see construction drawings
e Landscaping plan in accordance with the provisions of article XXV Existing
vegetation on the site exceeds standard landscaping additional landscaping on
construction drawings
f Location access and screening detail of trash enclosures Not Applicable
g Location and screening detail of rooftop equipment Screening shall be provided
from the perspective of a point six feet high at all adjacent property lines or from a
distance of 250 feet whichever is greater Not Applicable
h Location and detail of signage including method of lighting height width sign
display area etc Not Applicable
i Lighting location style mounting and photometrics Not Applicable
j Building elevations from all directions indicating materials and colors Interior floor
plans may be required Not Applicable
k Utility plan identifying size and direction of existing water and sewer lines fire
hydrants distance of hydrant to proposed building Not Applicable
SCANNED
303
I List of proposed hazardous materials use and storage Not Applicable
m Proposed fire protection system Not Applicable
n Such other information as may be required by the city
o Photocomposite images artistic renderings or site elevations which depict the visual
impact of the proposed development s design landscaping street layout signage
pedestrian ways lighting buildings or other details that affect land use within the city
shall be submitted Such images and renderings shall be from key vantage points and
provide an undistorted perspective of the proposed development from abutting
properties less intensive land uses and or from entryway locations Photorealistic
imaging or renderings are the appropriate level of resolution Please see photo
simulations
6 Within the HC districts the application shall also include
a Building elevations from all directions indicating materials colors and landscaping at
installation Please see construction drawings
b Building and site views from Highway 5 the appropriate access boulevard north or
south of Highway 5 and any other appropriate arterial or collector roadways Not
Applicable
c Site views showing the relationships of the proposed building or development to
adjacent development including buffered areas Please see construction drawings
d Drawings of all significant or atypical site features such as unusual landscaping
manmade water features other than retention ponds outdoor sculpture or other large
scale artwork and other uncommon constructs Not Applicable
e Sample building materials Please see photos included in the application
f Sample paving materials upon the city s request Not Applicable
7 Within the BCO district the application shall also include
a Identified boundaries of the primary zone and secondary zone on a drawing
depicting existing conditions and on a site plan depicting the proposed development
pattern Please see construction drawings
b Calculations and or drawings that identify the allowable density number of units or
building coverage under this Code including lands lying in the primary and secondary
zone Calculation of allowable density shall specifically exclude lands classified as bluffs
floodplains and designated wetlands Calculation of allowable impervious cover may
include bluffs and floodplains but shall specifically exclude designated wetlands Not
Applicable
Ord No 119 2 12 90 Ord No 203 92 5 994 Ord No 212 94 7 11 94 Ord No
286 96 12 14 98 Ord No 315 91 3 26 01 Ord No 377 9 15 5 24 04
SCANNED
304
CITY OF CHANHASSEN
RECEIVED
Mobile@
jet Vt1oY e tYoVt1llte@
OCT 0 5 2007
CHANHASSEN PLANNING DEPT
October 5 2007
Sharmeen AI Jaff
City of Chanhassen
7700 Market Blvd
Chanhassen Minnesota 55317
Re Amendment to Conditional Use Permit for a Telecommunications Facility to be
Located near 10 000 Great Plains Blvd Chaska Minnesota
Dear Ms AI Jaff
I am submitting this letter on behalf of T Mobile USA T Mobile which is applying to
amend it Conditional Use Permit for its planned construction operation and maintenance
of a communications facility to be located near 10 000 Great Plains Blvd Chaska
Minnesota This letter provides a general overview of the project including background
information and the reason for the amendment
T Mobile proposes erecting a 145 monopole to enhance T Mobile s digital network
nationwide and particular the area of southern Chanhassen Specifically T Mobile seeks
to improve coverage along Pioneer Trail Hwy 14 Flying Cloud Drive Hwy 212 and
Great Plains Blvd Hwy 101 for current and future T Mobile subscribers
Over the course of developing the site T Mobile engaged Pinnacle Engineering to
conduct an environmental historical review of the area During the process of the
Federal Communications Commission FCC application it was discovered that the
August and Maria Vogal Home which is east of the Halla property has been declared
eligible for the National Historic Register Considering this information the Minnesota
Historical Society State Historic Preservation Office concluded that the tower installation
at the location approved by the City of Chanhassen City Council would introduce a visual
element that would diminish the historical integrity of the Vogel House In a letter sent
to Matt Bartus of Pinnacle Engineering by Britta Bloomberg Deputy State Historic
Preservation Officer concluded that an alternate project site within the Halla property
could avoid the facilities adverse effect on the Vogel House For this reason T Mobile
is requesting to amend its April 9 2007 Conditional Use Permit approved by the City of
Chanhassen City Council This amended application reflects the alternate location which
would not have an adverse effect on the Vogel House
The September 5 2007 letter from Britta Bloomberg has been include in the application
Also please note that Cingular Wireless now known as AT T has submitted a
collocation application to add antenna to T Mobile s proposed tower at the amended
location which would aid achieving the City ofChanhassen s goal of minimizing the
number of cellular tower throughout the city
If you have any questions concerning the amended application please contact me at the
number below
SCANNED
IJ305
Should you have any additional questions or if I can be of any assistance please do not
hesitate to contact me Thank you for your consideration
SCANNED
J
306
C n 3i
Larkin
Hoffh1 Larkin Hoffman Daly Lindgren ltd
1500 Wells Fargo Plaza
7900 Xerxes Avenue South
Minneapolis Minnesota 55431 1194
GENERAL 952 835 3800
FAX 952 896 3333
WEB wwwlarkinhoffman com
October 4 2007
Ms Sharmeen AI Jaff Senior Planner
City of Charihassen
7700 Market Boulevard
Charihassen Minnesota 55317
ffY Of CHANHASSENRECEIVED
OCT 0 5 2007
Re Amended CUP for T Mobile Telecommunications Tower
Halla Nursery Site 10 000 Great Plains Boulevard
CHANHASSEN PLANNING DEPT
Dear S AI Jaff
We represent T Mobile USA on land use matters in this marketplace I am writing in support of
T Mobile s request to amend its Conditional Use Permit for a 145 foot monopole
communications tower at the Halla Nursery Site in Charihassen Minnesota
On April 9 2007 the City Council by a unanimous vote approved the T Mobile CUP and Site
Plan The City Council adopted 12 findings to support the CUP reflecting T Mobile s
compliance with the City s Zoning Ordinance and CUP criteria
Subsequent to City Council action T Mobile was advised by the State Historic Preservation
Office SHPO that its tower when constructed would diminish the historical integrity of the
setting and feeling of the Vogel House and the land parcel upon which it is situated SHPO
requested that T Mobile undertake to alter its Site Plan to accommodate SHPO s historic impact
concerns While T Mobile was considering this request it was presuming that it would have
some flexibility to position its tower on the Halla property without the need to amend its
approved CUP Based on more recent discussions T Mobile understands that the City does not
feel that it can administratively approve the altered Site Plan While we respectfully disagree
with staffs interpretation ofthe Zoning Ordinance we are willing to proceed with a formal
amendment process
As you will note from your review of the amendment application nothing is changed about the
use design height layout or configuration of the monopole and base equipment The only
difference is that T Mobile is attempting to accommodate SHPO by moving the tower location
approximately 450 feet west of its current approved location The amended Site Plan will still
comply with City standards in all respects
We request that you revisit whether the City can approve T Mobile s amended Site Plan
administratively If that is not possible we request the City process this amendment in the most
expeditious manner possible so that we can proceed with the approved monopole use while also
responding positively to SHPO and its historic preservation concerns
SCANNED
I
J
307
Ms Sharmeen AI Jaff Senior
Planner
October 4 2007
Page 2
Thank you for your consideration of this request
lY 1
P 1J
Larkin Hoffman Daly Lindgren Ltd
Direct Dial
Direct Fax
Email
952 896 3214
952 896 3265
pcoy le@larkinhoffman com
Cc Steve Edwards
Eric Engen
Charlene Schlager
Daniel Granquist Esq
Roger Knutson Esq
1 578611
SCANNED
308
City of Chanhassen
7700 Market Blvd
PO Box 147
Chanhassen MN 55317
CITY OF CHANHASSEN
RECEIVED
OCT 0 5 Z007
CHANHASSEN PLANNING DEPT
September 12 2006
RE Cellular Tower Colocation Letter of Intent
City of Chanhassen
I have been working with T Mobile on the placement of a 150 monopole on my property located along
Great Plains Blvd T Mobile calls the project AIP902
This tower is being constructed to allow for 3 three additional carriers in addition to T Mobile From
what I understand Cingular is interested in installing on the tower I intend to allow additional colocators
to install on the tower after entering into a lease for the ground space
Should you have any additional questions or if I can be of any assistance please do not hesitate to
contact me Thank you for your consideration
SincCfelY0
I
t i 0
Don H n
952445 6555
St Stephens
1
i i
r L
SCANNED309
RECEIVED
SfP 7 2007
r TY OF CHANHASSENMINNESOTAHISTORICALSOCIETY
State Historic Preservation Office
September 5 2007
Mr Matt Bartus
Pinnacle Engineering
11541 95th Avenue North
Maple Grove MN 55369
Re Pinnacle No MN06007 90
Construction of a 145 foot telecommunications monopole equipment shed compound
and access road Halla Nursery Property
T116 R23 S25 SW SW Chanhassen Carver County
SHPO Number 2007 1855
Dear Mr Bartus
We last wrote you regarding the above referenced project on 14 June 2007 recommending that
the owners of the August and Maria Vogel Home be invited to participate in the consultation
about this proposed action
We have appreciated your efforts to schedule a consultation meeting at the site on 20 July and
a subsequent crane simulation on 2 August We also appreciated the opportunity to meet with
you and John Landwehr of Pinnacle the property owners Walter and Chrisann Arndt Wendy
Biorn of the Carver County Historical Society and Sharmeen AI Jaff of the City of Chanhassen
at the Chanhassen City Hall on 23 August to discuss the effects of the project and potential site
alternatives
Since the last meeting John Landwehr of your office has indicated that your client would like to
proceed with the Halla Nursery site as documented in your letter of 20 June Based on the
crane simulation on 2 August the subsequent Summary of Crane Simulation document you
submitted to our office and the information about the landscape context of the house submitted
to our office by Summit Envirosolutions on 17 August we conclude that the tower installation at
this location would introduce a visual element that would diminish the historical integrity of the
setting and feeling of the Vogel House and the land parcel upon which it is situated As such
we conclude that a tower at this location would constitute an adverse effect on historic
properties
After the Federal Communications Commission and the Advisory Council on Historic
Preservation have been advised of the adverse effect we would expect to enter into
consultation to seek ways to avoid reduce and or mitigate the effect We have appreciated
the involvement of the property owners the Carver County Historical Society and the City of
Chanhassen in the review process thus far Due to the adverse nature of potential effects the
Preservation Alliance of Minnesota may wish to join the consultation process as well
345 Kellogg Boulevard West Saint Paul Minnesota 55102 1906 Telephone 651 296 6 26
SCANNED310
We believe that it is important to continue consideration of an alternate project site during the
consultation process including another location within the Halla property Our preliminary
review of such a location indicates that the adverse effect could be avoided
Contact Dennis Gimmestad at 651 259 3456 with questions or concerns about this review
Sincerely
ML J k
Britta L Bloomberg
Deputy State Historic Preservation Officer
cc Wendy Biorn Carver County Historical Society
Sharmeen AI Jaff City of Chanhassen
Walter and Chrisann Arndt
Bonnie McDonald Preservation Alliance of Minnesota
Andrew Schmidt Summit Envirosolutions
Steve Del Sordo FCC
Katry Harris ACHP
I
I
I
I
I
I
n
SCANNED311
REceIVED
OCT 1 9 2007
CITY OF GHANHASSENMINNESOTAHISTORICALSOCIETY
State Historic Preservation Office
October 17 2007
Mr Matt Bartus
Pinnacle Engineering
11541 95th Avenue North
Maple Grove MN 55369
Re Pinnacle No MN06007 90
Construction of a 145 foot telecommunications monopole equipment shed compound
and access road Halla Nursery Property
Chanhassen Carver County
SHPO Number 2007 1855
Dear Mr Bartus
Thank you for your letter of 8 October 2007 regarding the above referenced project As you know we
concluded that construction of this tower at a proposed location on the Halla property would constitute an
adverse effect on the Vogel House a property that meets the criteria of the National Register of Historic
Places
We appreciate the efforts of T Mobile and your firm to explore alternatives that could avoid this adverse
effect As you know as part of their licensing process the Federal Communications Commission must
consider effects to National Register properties under Section 106 of the National Historic Preservation
Act in consultation with our office and other interested parties
We have reviewed the documentation you have provided on the revised tower location situated
approximately 450 feet westsouthwest of the original location On the basis of the information in your
submittal we conclude that construction of the project at the revised location would have no adverse
effect on historic properties including the Vogel House No further Section 106 review for this site is
needed
Contact Dennis Gimmestad at 651 259 3456 with any questions or concerns
Sincerely
i
Britta L Bloomberg
Deputy State Historic Preservation Officer
cc Wendy Biorn Carver County Historical Society
Sharmeen AI Jaff City of Chanhassen
Walter and Chrisann Arndt
Bonnie McDonald Preservation Alliance of Minnesota
Andrew Schmidt Summit Envirosolutions
Steve Del Sordo FCC
Katry Harris ACHP
345 Kellogg Boulevard West Saint PauL Minnesota 55102 1906 Telephone 651 296 6126
312
Coverage with A 1 P0902
I
ItrllLVI 0 nJ1CI
Indoor Coverage
In Car Coverage
I Poor Outdoor Coverage
No Coveraget
I
Existing Site
Proposed Site
CITY OF CHANHASSENRECEIVED
OCT 0 5 2007
CHANHASSEN PLANNING DEPT
en
z
z
m
c
313
r VlolcTA1P0902ExistingCoveragewithout
Indoor Coverage
D In Car Coverage
D Poor Outdoor Coverage
D No Coverage
Existing Site
0 Proposed Site
CITY OF CHANHASSENRECEIVED
OCT 0 5 2007
CHANHASSEN PLANNING DEPT
of
ROCKS01JD
COVERAGE
rIa
en
z
z
m
c
314
CITY OF CHANHASSEN
AFFIDA VIT OF MAILING NOTICE
ST ATE OF MINNESOTA
ss
COUNTYOFCARVER
I Karen J Engelhardt being first duly sworn on oath deposes that she is and was on
October 25 2007 the duly qualified and acting Deputy Clerk of the City of Chanhassen
Minnesota that on said date she caused to be mailed a copy of the attached notice of Public
Hearing for the T Mobile Cell Tower Planning Case 07 04 to the persons named on
attached Exhibit A by enclosing a copy of said notice in an envelope addressed to such owner
and depositing the envelopes addressed to all such owners in the United States mail with postage
fully prepaid thereon that the names and addresses of such owners were those appearing as such
by the records of the County Treasurer Carver County Minnesota and by other appropriate
records
Subscribed and sworn to before me
this day of ycter 2007
9 KIM T MEUWISSEN
1 Notary Public Minnesota
My Commission Expires Jan 31 2010
315
Notice of Public Hearing
Chanhassen Planning Commission Meeti
Notice ofPublicHearing
Chanhassen PlanningCommissionMeeting
Tuesday November 6 2007 at 7 00 p m This hearing may not
start until later in the evening depending on the order of the agenda
City Hall Council Chambers 7700 Market Blvd
Request for Conditional Use Permit and Site Plan Review
Amendments to allow a 145 foot Telecommunication Tower
with a 4 foot lightning rod and a 6 foot privacy fence
T Mobile USA
West of Great Plains Boulevard north of Creekwood Drive
south of Halla Nursery and east of Bluff Creek Golf Course
Outlot A Halla Maryanne Addition
A location map is on the reverse side of this notice
The purpose of this public hearing is to inform you about the
applicant s request and to obtain input from the neighborhood
about this project During the meeting the Chair will lead the
public hearing through the following steps
1 Staff will give an overview of the proposed project
2 The applicant will present plans on the project
3 Comments are received from the public
4 Public hearing is closed and the Commission discusses
the project
If you want to see the plans before the meeting please visit
the City s projects web page at
www cLchanhassen mn us serv plan 07 04 html If you wish to
talk to someone about this project please contact Sharmeen
AI Jaff by email atsaliaff@cLchanhassen mn us or by phone
at 952 227 1134 If you choose to submit written comments it
is helpful to have one copy to the department in advance of
the meeting Staff will provide copies to the Commission
The staff report for this item will be available online on
the project web site listed above the Thursday prior to the
PlanninJ Commission meeting
ng
Date Time
What Happens
at the Meeting
cant
Property
Location
Location
Proposa
Appl
Tuesday November62007at700pmThishearingmaynot
start until later in the eveningdependingontheorderoftheagenda
City Hall Council Chambers7700MarketBlvd
Request for ConditionalUsePermitandSitePlanReview
Amendments toallowa145footTelecommunicationTower
with a 4 foot lightningrodanda6footprivacyfence
T Mobile USA
West of Great PlainsBoulevardnorthofCreekwoodDrive
south of Halla NurseryandeastofBluffCreekGolfCourse
Outlot A Halla MaryanneAddition
A location map is onthereversesideofthisnotice
The purpose of thispublichearingistoinformyouaboutthe
applicant s requestandtoobtaininputfromtheneighborhood
about this projectDuringthemeetingtheChairwillleadthe
public hearing throughthefollowingsteps
1 Staff will give anoverviewoftheproposedproject
2 The applicantwillpresentplansontheproject
3 Comments arereceivedfromthepublic
4 Public hearingisclosedandtheCommissiondiscusses
the project
Date Time
What Happens
at the Meeting
Applicant
Location
Property
Location
Proposa
Questions
Comments
If you want to seetheplansbeforethemeetingpleasevisit
the City s projectswebpageat
www cLchanhassenmnusservplan0704htmlIfyouwishto
talk to someone aboutthisprojectpleasecontactSharmeen
AI Jaff by em ail atsaliaff@cLchanhassenmnusorbyphone
at 952 227 1134Ifyouchoosetosubmitwrittencommentsit
is helpful to haveonecopytothedepartmentinadvanceof
the meeting StaffwillprovidecopiestotheCommission
The staff report forthisitemwillbeavailableonlineon
the project web sitelistedabovetheThursdaypriortothe
Planning Commissionmeeting
Questions
Comments
City Review Procedure
Subdivisions Planned Unit Developments Site Plan Reviews Conditional and Interim Uses Wetland Alterations
Rezonings Comprehensive Plan Amendments and Code Amendments require a pUblic hearing before the
Planning Commission City ordinances require ali property within 500 feet of the subject site to be notified of the
application in writing Any interested party is invited to attend the meeting
Staff prepares a report on the SUbject application that includes ali pertinent information and a recommendation
These reports are available by request At the Planning Commission meeting staff will give a verbal overview of
the report and a recommendation The item will be opened for the public to speak about the proposal as a part of
the hearing process The Commission will close the public hearing and discuss the item and make a
recommendation to the City Council The City Council may reverse affirm or modify wholly or partly the Planning
Commission s recommendation Rezonings land use and code amendments take a simple majority vote of the
City Council except rezonings and land use amendments from residential to commercialindustrial
Minnesota State Statute 519 99 requires all applications to be processed within 60 days unless the applicant
waives this standard Some applications due to their complexity may take several months to complete Any
person wishing to follow an item through the process should check with the Planning Department regarding its
status and scheduling for the City Council meeting
A neighborhood spokesperson representative is encouraged to provide a contact for the city Often developers
are encouraged to meet with the neighborhood regarding their proposal Staff is also available to review the
project with any interested person s
Because the Planning Commission holds the public hearing the City Council does not Minutes are taken and
any correspondence regarding the application will be included in the report to the City Council If you wish to have
somethinq to be included in the report please contact the Planninq Staff person named on the notification
City Review Procedure
Subdivisions Planned Unit Developments Site PlanReviewsConditionalandInterimUsesWetlandAlterations
Rezonings Comprehensive Plan Amendments andCodeAmendmentsrequireapublichearingbeforethe
Planning Commission City ordinances require allpropertywithin500feetofthesubjectsitetobenotifiedofthe
application in writing Any interested party is invitedtoattendthemeeting
Staff prepares a report on the subject application thatincludesallpertinentinformationandarecommendation
These reports are available by request At the PlanningCommissionmeetingstaffwillgiveaverbaloverviewof
the report and a recommendation The item will beopenedforthepublictospeakabouttheproposalasapartof
the hearing process The Commission will close thepublichearinganddiscusstheitemandmakea
recommendation to the City Council The City CouncilmayreverseaffirmormodifywhollyorpartlythePlanning
Commission s recommendation Rezonings landuseandcodeamendmentstakeasimplemajorityvoteofthe
City Council except rezonings and land use amendmentsfromresidentialtocommercialindustrial
Minnesota State Statute 519 99 requires all applicationstobeprocessedwithin60daysunlesstheapplicant
waives this standard Some applications due to theircomplexitymaytakeseveralmonthstocompleteAny
person wishing to follow an item through the processshouldcheckwiththePlanningDepartmentregardingits
status and scheduling for the City Council meeting
A neighborhood spokesperson representative is encouragedtoprovideacontactforthecityOftendevelopers
are encouraged to meet with the neighborhood regardingtheirproposalStaffisalsoavailabletoreviewthe
project with any interested person s
Because the Planning Commission holds the publichearingtheCityCouncildoesnotMinutesaretakenand
any correspondence regarding the application willbeincludedinthereporttotheCityCouncilIfyouwishtohave
somethinq to be included in the report please contactthePlanninqStaffpersonnamedonthenotification316
i
i
j
Disclaimer
This map is neither a legally recorded map nor a survey and isnot intended to be used as one This
map isa compilation of records information and data located in various city county state and federal
offices and other sources regarding the area shown and is to be used for reference purposes only
The City does not warrant that the Geographic Information System GIS Data used to prepare this
map are error free and the City does not represent that the GIS Data can be used for navigational
tracking or any other purpose requiring exacting measurement of distance ordirection or precision in
the depiction of geographic leatures If errorsor discrepancies are found please contact 952 227 1107
The preceding disclaimer is provided pursuant to Minnesota Statutes 9466 03 Subd 21 2000 and
the user of this map acknowledges that the City shall not be liable for any damages and expressly
waives all claims and agrees to delend indemnify and hold harmless the City from any and all claims
brought by User its employees or agents orthird parties which arise out of the users access oruseof
data orovided
1
Disclaimer
This map is neither a legally recorded map nor a survey and is not intended to be used as one This
map is a compilation of records information and data located in various city county slate and federal
offices and other sources regarding the area shown and is to be used for reference purposes only
The City does not warrant that the Geographic Information System GIS Data used to prepare this
map are error free and the City does not represent that the GIS Data can be used lor navigational
tracking or any other purpose requiring exacting measurement of distance ordirection or precision in
the depiction 01 geographic features If errorsor discrepancies are found please contact 952 227 1107
The preceding disclaimer isprovided pursuant to Minnesota Statutes 9466 03 Subd 21 2000 and
the user of this map acknowledges that the City shall not be liable for any damages and expressly
waives all claims and agrees to defend indemnify and hold harmless the City from any and all claims
brought by User its employees or agents orthird parties which arise out of the users access oruseof
data orovided j317
JAMES W SABINSKE
775 CREEKWOOD
CHASKA MN 55318 9621
HARRY E NIEMELA
9700 LAKETOWN RD
CHASKA MN 55318 4513
GARY DEBRA ANDERSON
725 CREEKWOOD
CHASKA MN 55318 9621
ALBERT SARAH J AVEDIKIAN
10220 MAN DAN CIR
CHASKA MN 55318 9401
DANIEL SCHAITBERGER
CATHERINE A SCHAITBERGER
10241 MAN DAN CIR
CHASKA MN 55318 9402
BRUCE W PAUL
10240 MAN DAN CIR
CHASKA MN 55318 9401
BLUFF CREEK GOLF ASSOC
1025 CREEKWOOD DR
CHASKA MN 55318 9647
THOMAS J KATHLEEN R GERTZ
10001 GREAT PLAINS BLVD
CHASKA MN 55318 9466
DAVID R TEICH
1217 MONROE ST S
SHAKOPEE MN 55379 2062
DONALD E HALLA
SANDRAJ CWAYNA HALLA
10000 GREAT PLAINS BLVD
CHASKA MN 55318 9465
WALTER G CHRIS A ARNDT
10151 GREAT PLAINS BLVD
CHASKA MN 55318 9469
DALE ALAN GUNDERSON
DEBRA LYNN JENSEN
845 CREEKWOOD DR
CHASKA MN 55318 9643
JEFFREY KATHLEEN DYPWICK
10300 GREAT PLAINS BLVD
CHASKA MN 55318 9467
TERRY B GAYE E CARLSON
821 CREEKWOOD DR
CHASKA MN 55318 9643
TIMOTHY A TERESA M VOEHL
770 CREEKWOOD DR
CHASKA MN 55318 9620
MARYANNE M WHITE
670 CREEKWOOD DR
CHASKA MN 55318 1149
ANNE CLARA VOGEL
815 CREEKWOOD DR
CHASKA MN 55318 9643
MARK D KAY M HALLA
6055 HWY 212
CHASKA MN 55318 9250
SPENCER L GLORIA A BOYNTON
TRUSTEES OF TRUSTS
777 CREEKWOOD
CHASKA MN 55318 9621
RENEE L STRICKLAND
10251 GREAT PLAINS BLVD
CHASKA MN 55318 9468
RICHARD T HALVER
10271 GREAT PLAINS BLVD
CHASKA MN 55318 9468
ANTHONY TINA SWANSON
10260 MAN DAN CIR
CHASKA MN 55318 9401
J
318
II
I
1
PROJECT DATA
OCTERIORlEAS SPAIX
l28 FUT
1
MAP
I
tiClltlCWQOO
i I
rCMAS1JI ILW
I
Mobile @
GENERAL NOTESSCOPEOF
II I
I
DIRECTIONS
SlTEOIRECTIONS
fC l 1 l O
g o
I
R Wf T iJ GO I
P TATE ONE CALL I
twIN CmES AREA 1 4l4 0002
lI TOLl rllEE 800 2l2 1l61
A1P902 fI
la g
1 j
1 t l
DRAWING INDEX
PROlEClIHFORIoIATION NjO CNRAL HOTES
OIAACCDSlTtPV N
AHTElOAA H llRrIoIT1OH AND TOWER UEV f1Oll
tC
STANONtD GOl 2 erN EOlJIPUNlc auTS
PIAH EUVAnVICWS
STANllIlO PRCU tOUENl CJaINl PNl
tuVA IlWS
sr D SIT lIoIPROYEloI NT SPEoncATlOOIS
rtNC G sPECIFlCATlONS
rtNCNGSPECIFICA
STN CNlO l CTRICAl SPtClFlCATIONS
ST llAAO AlTENJiA coox GAOVNOllC
SPEClFlCAOOS
STANONlOAfTEWNAC Wl IHSTAIlAllOH
SPClflCAnQNS
r t I l II Q
gi i SPSTUGril
OELEtmlCALSPEOFlCATlONSCOoEAA
STAoNCWlOCONSTRlCTlOfSPlClFlCAllOHS
GENIW NOTISSHETl
STNWlOCON5TRUCTlONSPEClflCATlOHS
GNCRIrINOT SSttt1 2
STANlWlD PJlTTORMf1JIJllQA nIfIl
PCIf1CATlOH5
STolHCWIDE PtArrORlotOO HSION
WAVGUIl MIlG SPEClntATlOHS
lVIlOOC
A SI
us I
AJS I
m
g a
us 1
STtNltJtO
STNiONlO
rn
PROJECT TEAM
IlI PRnvrtl lT tlWl R
T lKlIlL tctH noo oWN
c o YOlCtSTREAlol WlRHESS CORP HIWA YVT IllVO
12i20S 3athSTRELt loIlNNuPOUS loiNBuEoV11i8006428
nrCTRttAl IIT11mr
xcn NRCY
6801 IIHOWX TlUlt
Elll IoIN4Jll
tRCHlrF nITNC rll mrPHrvIm mr
T lIOOIl tlNEAFQUS ow
llOOOWSl111lhSTIl l
SUTE400
ElllNAW 4N
10NINr OItr T10Nlit NOTlflr H
081
T 1 NM
EOINAt4N Cll
ABBREVIATIONS
ARCHlTfCT AWPVl EOflIIEm1
9lJlOItC IT CIItCUITIlREAAEIlNJ PIlWoIE llAllNG
CATCH flISIN Af1 NJINIINISt1 FlOOR
lc NJCN GROUND
ATS TOIoUTIC J1WISfl f1 SWITCH
Nt NMERE IH1 IlRUPTtIC UP1CJTY
ca ClRCUlTIIREAAEIl
ClCT ClllCUlT
CEN CENERolOR
en GROUNO rUlT INTERRJPlER
JEl JUNCTION BOX
KII XllOVOLT IoIPRS
Oi XIlOw TT S
lollS IoWIWTIWoSfERswrrcHNrNONrvscO
HJ C NOTIHCOPlPNIL
PIl PtW
PIC POlNlIffl ettORIlXIlCPlRECEPTlCl
IlCS AIGIOCALVlEOS1tU
YlI SYIlUETIIICAL
TD TE1EPtNE
XFIoIA1JW lSfOJtIolUlm
U G UNDUlCIlOLlND
ris OR WMWPWEATHERPROOf
WTTHOUR1oII Ttll
IJIoIO UNLCSStoIQTtIQnl llWlSE
OWotrTER
lllllOOSlON
c
tlINIl JW
WlCWNlEOIJ
iWE
STINLESSSTEEL
1YNS
rnn
1l8
PAWC
TOPOf SlAll
or
BOTTOW or
H
OC
C 8
C
C
CONe
COH
r
owc
C
EOUIP
lCIST
nc
L
N T S
O C
REO D
T C
t
T O S
fOf
CONTAAClOIlStWJNomTIENClNEERIf0ETusARETHErOlLOWlNGTAIllEUNATSMEIltSPONSB1UTIESOFOIfTERENTPARTIESINYOLYEOCOtlPlrnNCTHISPROJECT
ctlNSIOERrDUNSOlINOUNWtNOTWTRPAOOFORNOTftIITSPEClFlCSCOPEOFWORXWILLPRrCE1OlSCIlEPNoCIESrouNOOolTHISSCOPEOfSUPPlY
WITHINCIJSTOllARYTlWXPAACTlCEIfKISPEllrORlAO
loI TI ETOISSW OF Xl RAW LANO SITE I CO LOCATION StTE
THE DESIGNlMODlFlCATION5T8INCUJOEosPIIlT
OF liII04I111olfURNISiolEDBIfEWrvRNlsNEOIl
UISTINICnEVTIONSANLOCATIONSTOBEJOINEDSHAUBETOWERTwOElUinsPv1TORtlTwOBILECONTlUCTOR
looT E IF lfTS PVTrORw T wOSU IJTSPlATrORW roIJNOATKlN COH1lWTOll coomlACTOR
CONTRACTORswuNOTlNftIENCINASUCHTt1ATTOWER01181PlATTORrOUNlATKlNCONTRfICTORIURCEUCA8liolET1OWtRltLC0TIoI08llCONTllACTOR
IONS CAIoI liE loWE BUOHE PNOCHQlOIG 101 PUACUCAlltoiLt POwtIlTnco T IoIOBU PVIlctu CA8lNJ 8lTTtRIES T woeu CONTRAClOR
PliRCEll CAlllNLt IlA nERIES T 1oI08U 8TSCoBINCTS T tIQ6U T tlOflL
AU STllElOlSAND8BREIAllONLlOONfloEDRAWWCS
ARE COSlOCREOCONSTllVCTlONSTNoIOROSIfll81SCABINETSTWOOUNlTlNATlIoI08UCONmICTOR
R TI t NC
I
tlB AHTINNA T WOOU COU caL T lIOBU CONTRMTOR
P Cl4NGWITHXcooCASlT1l0BIJIJWACA8lESlWOflUCONTTUCOA
1J E CONTlWTQRSkoIUPR7IIlDEAiLNECESSARYBLOCXtlCJIJPACA8lLSTWOBUWlDWNOISEAAlPUflERT1l0BUCONTJVrCTOR
1I1ER SUPIOfIT rOR ALL WLOW NOISE oWfUnER T 1ol0BU CRONOING XITS rOR coo T 1olOtI1LE COHTfVCTOR
CITT lPPROYEOPLo6SliALlIIKEPTINAPLtNBOXANDGIlOVNOlNGXITSrOFtcooTlolOOlLSITECROONDlNGlMTERWSCONTRACTORCONTRoCTOR
stWNOTBEUSEDEnWORKtlENuCONSTIlUCTIONSETSSITECROUNOtNGlUTRwsCOWlIlAClORmTtNWItlQIJHTlNGPIPE011BIlACIIlCOIffiltCTORCQN1RICTOR
I Jx r rccgr O rTS ANlNWI tlOUNl 1NG PIP BIlACI Ef COHTJWTOR WAVEGUIDE 81ll00E rQPl TO TWIl COITAACTOR COHlRACTOR
WlRG
E
O
THE WAYEGUlD BIllDCE EOPl TO TWR COHTAATOR WAVEcua UDllR TOwER CONTRACTOIl CONTRACTOR
CARE OFTHEJOeSuPEIlINltNOEJolTWAYEGJIDlAOOERTOWERCONTItIlTOftftNCECONTRACTOACOHTAACTOR
fENCE JNOERCROUNO WORK COflRICTOR CQN1RICTQR
UNOEllGROUNO WORK CONTRMTOR SlTEWOAX CONTRACTOR COHTRAClOR
CODESANDSfTtWQRxClIRACTQRPOWERDISCONNECTmRBOXCONTIlACTORCONTlWTOR
DlSCON CT tlEml UTUTY IJTUTY
ROOFTOP 51
fURNISHED BT lJolTWO 8
T oau COHTIlACTOA
T loIOBU COHlTWTOR
T tlOOU CONTRACTOR
T WooU CONTRACTOR
T OBIl T IlOBlLL
T 1oI0811 E CONTllACTOR
T IolOBU CONTRACTOR
T lIOOU CONTRACTOR
T lIDI IU CQHTlttCTOR
l loI08U CONTRACTOR
CONTlUoCTOR CONlRAClQR
CQHTRtCTOIl CONTlWTOR
CONTRACTOR CClHTAACTOR
CONTRACTOR CONTAACTOR
COHTRACTOR
CONTRACTOR CONTRACTOfl
CONTRACTOA CONTRolCTOR
I
lTEW
ROOfToPPV TTOfttl
AODnoP ANTENNA SUO ATTACmlI
PURCELl CAQlNCI POWERrrnCO
PVRC LL ClBINLt BtTTERIES
91 ClBI CTS
000
INI LOW HOlS PlTltR
CROJINC KITS rOR cou
SITE CItOUNDlNC WATtRWS
SITE GROUNDING WATEIlWS
AHTE WOUHTINPIP BIlACI l
AOOFTOP COU ATTACHtlEHTS
UNOEACROUNO WORK
DISCONNECT WEmI BOX
m
INSTAllED BY
0
CONJRACTOR
COH
COHTAACTOR
CONlRACTOR
C
COH
C
INSTWO BY
CONTRACTOR
COHTFWIOR
C OR
co
UN
WATER TOWER 51
fURHISHEDB
T tlOBllE
roou
T OSU
I
IJTSPV TrDRtlrO lNOATOIol
PUACELL CNIlNET POWERTElCO
PlIRCEUCAlINLt IlA T1RIES
BTSCABlNElS
STANDARDS
NlCONSTRUCTIOHStWlCOlolPrWITHTl4llATtSlADOPltl
EOOKlN OfTlErOlLOWINGPU9UCAlIOloS
I ASTIIIERlCNISOCIElYrORTESTINGANOIoIATtIlWS
2 ACl AAlERICANCONCROEINSTTTVT
J AlSCAAlERCANINSTTTVTOFSTElCONfJlUCTlON
4 lIS NlERICNlWElDINGOCIETT
UIlC UNlrQRwBUILOIHGCOOE
6 lIOOT 1lINESOTAQPARTloINTOfTlWoSPQIlTATION
1 NISi oWERICNlWlnONAL1ANQAAOSlNSTnIJTt
8 lE E lNSTlTVTEorELEClRfCAlNlOElECTRONICSENGINEERS
9 tlfC WoTlOlAlElCTRICAtCOOC
10 NE WoT1QWLELECTRICAlloWlUrCTJREIlSASSOClInoN
II NESCNATlOWJELECTRICAlSAfmCOlottlISSlON
12 OSt OCCIJPATlONAlSAlUYANDHEALTHYAOlM1llAOON
1J IAUNOERIIRITERSlIBORATORlES1NC
U APPucoBLELOCALCODESANOOIlQlWlCS
lNA LOW NOISE AAlPUfTUl
GROlNOItf KlTSrQR COoU
SITE lIATRIALS
SlTtCROUNOlNGlIATUlIoloLS
mTtNTTACtlfIolENTS TOWER
ANTtNNA WOltmNCPlPE BRACIET
w VECUlOE 81llOGE EOPT TO 1IlTl
coo ATTACHEWEN1STDWt A
UNOEAGAOlJNO WOIll
S1TEWORX
PQWR OICONJolECT 011 tlETrR BOX
m
LEGEND
OCTNL NUtll lEIl
1OETAIL
5
OAAWlNoG ON WHICH ORIGlNIl OCU l ws CRAWl
BlAA QENOTS OCTAl IS OH AlIE DRAWiNG
SECTlONILTTER
ASECTION
51
DRAWlNCON ORIGlNN SECTIONWsOIlA WN
BlANIl NQT SECTION IS ON AlIE DRAWING
THE CONTIlACTOR StWL SUPERVISE AND DlIlECT NlWORK
USING HIS BUT S I L NO AtTENTlON liE SI L BE SOLET
RESPQNSlBll fOR AUCONSTRUCTION WENS IIETI1OOS
PROfOC OUE E OI
X1
T OO II E
1NCUOtNC 8lJT NOT U ITtOTO tlECHANlCAl EUCTllICAI
SEIMCE NlO 0IERNl CQOROIno
5 T
XI
DISCREPANCIES CQNfUCTS OR OWI SIONS lCSI10lU
IlEPQRTEllTOTHErNClN ER8ErOREPIlOCEEOlNCWlTH
THE WORX
THE CONTRACTOIl SHAU PIOT CT ALL ARtAS rROW oIWC
IrI1tCH T OCCUR NC COolsTRUCTION N OAcE TO
HCW AND ISTINC CONSTRUCTION smuGIVROR EQUlPtlENT
SIWI6E 1 EDIAT LY REPRED OIl RPlACEO TO THE
Sln rMTlON or 1J E TENNlT OR 6UH DI G OWNER OR
OWER S REfR SENTAllYE AT THE EXPENSE Of TIi
COlolTIlACTOR
THE CONtRACTOIl SHAU BE IlESPONSIBLL rOil NlO SHAlL
lAC OR REWEDY Nf FAULTY ItlPROPE A OR INftJl1OA
Nw t U
lCCEPTN lCE OF 1H WORK UNOEIl lltS CONTRACT
THE COWlRACTOIl StWJ RDlQVAURVOBISH ANO WASTt
TtIlWSON A REGULAR BASIS olNOStWJ EXtRCISE
STRICT CONTROl OYER JOB ClLHING THROUGHOlJI
CONSlRlCT1ON INClUNGrlNAL ClCANUP UPON COIolPlElIOfl
or WORt AU AAEAS ARE TO BE UfT tl A 1lIlOOtl a EAI
CONOITION T li ENO or EACH OAT
n SHALl BE 1H Il sPONSIBUTY or THE CONlIVoCTOR TO
LQCt T AUEXISTING UTUTIES WHElIlER HOWTO HERtlN
rOJol O S x s EREPrOR
AEPvc tlEHT Or ununE 011 OTIA PIlOPERTY cwwro1101
CONJUNCTION WlTH THE ExtCUTION Of WORX
THE CONTlWTO StvuBE IlfSPONSI8l rOR THE COIlPlfE
S CURmor THE ITwHll 1H J08 IS IN PIOCRSs oNI
UNn nEJOB 1 COWITD peA u a c
AU CONSTRVCTJON WORK SHAll CONflP TO Tt1 U B C fO
Al101HROOYERNINGCOOE5 AlOJolCWln4T1 COVRNlNG
coot
THE CONTIlACTQq NIl AU SVBCOCTORS StWl CQWPLY
WllH AU lOCAl COO Il GlJLnOIiS ANO STTE OEPIIlTt lEfjT
OF INDUSTRIAl IlECVU TIONS ANO DMSIQN OF INOUSlR1Al
s
REOUlllr ENlS ll fIlTOTHECOOESSEC1lO
TlE COlo11lACT0I l sKlU OBTAIN lO PAT JOfl Nt PfRIIlTS
UCEJolSE NlD INSPEcnotS NECESSAAT FOR PERJ ORtWKE
orTHE YlQRX ANO IolClUD IHOS IN Tt1 COST or TlE
WQRl TOnEOwNR
fIGURED DlIolENSlONSIEPRECloIC 0YUl 01lA 1WlG SCAlt
AHO OETAlL ORA WINGS HAvE PRECEOElCE 0VE1l SIolAll
SCAU ORA W1NGS CliECXACCuRACTOFNl DltlENSIONSIN
THE rl LO UHESS SPEClncALLY NOTED 00 NOT rASIllC T
foK TEIlIALS Orr SlTt OR fEllrOl ltl N CONSTRUCTION
LINlITHE ACCLIRACT Of DRAWING Cl4 tlolSIONs t VE BlEN
VERIfl DACllolSTACT JJlrIEUlOl rlolSlOolS
COHlIlAClORSHAU NOTIn ENGlNcrRor1CONruCTS
oC ci D S lQR
TO EXECUTING THE WORX I OUES1OtII
TfTJD 44 40 11
lONCfTUOE 113 32 2J 1
A rm ptRCn NtIIlRfR
lmr In POR1 IOfNnWfltlN
319
I1
1
iIiI
l
J C
I
L m
I
I
I
v
i
9
f
i 0
i
I
J
HALLA NURSERY
fA
OISTlNC
CAAVQ AJlEA
L
fXlSnNC DC
OI CItlVEl
I EXlSTlNC PROPt lilfY lt
lI
I
I
I
I
II llco
W
J
TlNCTtLCO
PEDESTAl
1
1
k
DISTING
JI
I
I T IolOBU l X J
llAS AArA
L
I
SO O ST
XIS1lNCCRASAPPL
S
NOTIC ToSOAAWlHC 4ASNOT9EENPJEIUSHOANO
I rOor R C
CONnOENTW use ONlY AN lH CONSIDRAOON or
TllElOANOfMSORJ MNQ M90RItOWIlPItOlollSrs
AN1GIl STOIttTJRllITIJPONIlEOUCSTNf JACII S
Tk T rrwu NOT II RPRODUCtIJ coPIEtl UNT Oil
cr C isOllMobile
MINNEAPOLIS
320
J0lllU150l
QtAAO
u
u u u u u u u
r uu
NOTS
T fCIA DSCAIHCfOllWTlOfoI JtftRTO
0flAICAlpg02 CJ
2 THE lIONOPOU SKolU BE PAlHTEO nt
COUlIlillUEl 1loEIlECflR lNO
CI II06ILL C Rck7GAAVU@
I
XISTlNGlREE
1
T IoIOBU WOHORS1Ul fW1i fOR
Dio rcT Y
T IoIOBUAIl
fACING a
T
T 1oI08U
fACItiGI20
1
T W08lLE lOW PROfll
ANTEN lolOUNTlIG PIA
L o
7
Li J D7
1 T tKl8ILL NtTENIIAo
rAClNGU
I
I
O T WOlll FDlCDA REA
S O WOlllt USARA
x
l IlOOlLE
WAvtGUlOC
T WOBUUllI
CPSAHTEH
ii
y
1
AII902C2
HALLA NURSERY
A1 P902
ENLARGED SITE PLAN
10000 GREAT PLAINS BLVD
CHANHASSEN MINNESOTA
llttO jOlU WING
A1P902 C2
lftl D UOIlOO CAIlOFUllO1101
1 11 01
0
On
IoOOCtWLU C IoIILlEA
I bo cetlfyItIoI U plon if lonor 1X1
pt Pf b Ot e t Inol r cl PVIon
i I x l EngHaTCEnwsOllJWlNCWoSNOl8EENPVEIUSHONO
ISTH SOU PROPERTI yT lII08lIE l tN S
llAA1 fNJIJIS lElIT TO THE llOIlIlOIERfOR THOR
HTlollus ONlY fll or
r
0
Mobile
MINNEAPOLIS MARKET
T
@ FVTURET WOBllL
EOUIPlolEHT flATFORIot
OlPANSIOH
FlTVRET IAOBILE
QUlpttENTClBl olrTS
@t I106IU6 OOkIGH
t CEOAArLNC
t OI09ILL II oz CEOUCH
WEED 1Wl R fAlbC
OIJNSCAP 1WC1C
1 111 Q1 ISSVED fOIl CONSmllCTlN
2 4 1V01 RElOATIllIAS NO
J lDl07 I 0CA1ED lIAS ARtA
I
I
ir
321
CAU 48 I1OIHS8fOR OICQII
GOPHER STATE ONE CALL I ITWIOClTtsAReAI4540002
lOll I llOO 2 2 11ee
PLANT SCHEDULE
CllloIO l E
IllAClCHlllSsPftUCE BAcIl STIWOHT lEAO R
I
LANDSCAPE NOTES
I RETUlTOsrrtPlN fOROIlolOISlOHSAAClSlTtD lTA
2 REfR TO GIWIHG PLAN rOR CIlJrDSUlISINCtTROL NolO RESTOllATIOI l or GIWOAREAS
GENERAL NOTES
1 lANDSCNE tmtICTOR TO UI1fY u UTIUTY locoT1t6 PROPEIITt WITH THE ctNOIAl CONTIVCTOR N flY
CNJJ1oIC COPHER STAT ONE CAU 6S1 454 0 x2 PRIOR TO STAIINC PlANT LOCATIOIlS
2 COOImIlflo PHIoSS or COHSTROCIIOfI AACI PlNffiNGIHSTALlATlON WITH OTHER COHTlWTORS WQRINC 010 SITE
1 WHER EXISTING TREtS AACI Oft SCN1f 1CYf SHRlJ8S IAASSlNGS All E rOlMl ON SIlE SClfIIOiIHE OAAWING
r ci VJx Il
R OWti s w LOflR Ea g
ATfHTKlil or melANOSCAPEARCHTECT PRIOR TO ROlOVolL
4 g G mEES TO REIoWtl TO BE rERTlJZEO AND PRUIEO TO RWOV ocoo wooo NolO QAIMGQOR JW6BING
88 TREES INQ SHRJ8S All 8AUQ NolO SURlAPEO
NO PIAHTWolRW SUBSTITUT10NS MLl 9 ACCEPTEO UllESS NfftfNAL 1 REOUESTtO or THE ClSCN E
MCHTECT 8Y THE LJHlSCAP CONTlACTOR PRIOfl TO TliE SU6IolISSIN Of A 1111 l00fI QUOTAT1Otl
1 u PlANT IUlTERW StWJ COllPlY WITH THE LATEST EOOION or THE NoIERICAN STNlQ tRO rCWl NURSERY STOCK
ASSOCTlONOF NlJRSERnIEH
8 COIlTRotCfOR 1 RrSPONSIBtL fOR H C 1IAj Ofu IlEWLY IHSTAI1Ell Wn RIAlS UNTIl nWE or OfiIOEA
ACCPlNlC IHY ACTS or YllWJSllOR oOwCWHIlI OCCUR PRIOR TO OWI R olCPTAHC StWJBE
flo RE S1aurr Of THE COIIRACTOR
g COIfTRACTOfI SIWlPFlMQ A WRlTTtH R OUEST rOM THE WllER NXEPTuE IItSPECIlON
10 WAIIREHTY fOR lJNOSCNE WolJl1ALS StWJ flEClN ON THE DATE or ACCP1AHC flY THE lANDSCAPE ARCHfTECl
AfTER THE COWPETION Of PlANTflC oru IJMSCAP IUlTERLolSNO PARTIAL ACCPlAN WlU at CONSIlAOO
II CONIltACTOFl SHAlL GIWtAHTEE Htw PIAHT WoTERAlTHROUGH ON CALENOAII YEAR fllOloI THE nll Of R
cctPTAHCI WITH AUIlEPlACEWENTS TO BE PROYlOED AT NO ADOlTKlNAl COST TO Tli OWNER
12 NlUo Of OISTJIm HCrOIl SEEOIII SIWlflE FlELO VERlnEO AT CONClUSION orCONSTRUCTION
EXISTlNCJllUST08E
REWOYO BY CONTAACTOR
14 0
LT IolO91LEClASSS
l
NI 7
00
11
T W08llE EOIIFIIN1
PlATfORllol lOVlPM NT
m
c
s
PLANTING SPECIFICATIONS
1 PlNtnNG BED PEPERA1lOfol w wsS P1m1l 8EDS StW llE nwoTO A l UtI ClEPTI1 Of
SHAl1 8E NPLEO AlTER CULTNATIOol
2 BACIfU SOILUS SOIL OCUYAltO F1lOloI PIAIoff1NCIQLS 0 ONtENOWEIfTS RlIOV
INClUOWG ROCICS lAAGC1l T1WIJ DIAAll 1l
J rERTUZA AUPlANT lLRIoOU SIWlBE fUmOZOO UfCltol INSTALlATION WIT 0RlE0 BOtIEWOrI OIl OTH1l
SPECIIlEOrERTlUZEAw lQlN 1l1ttl PlJHJlNiGSOI PIITtl IUHLIf EIl SINSTRuCTIOHS
4 l ACHWol1l1AL AS sPtCflEO IN Ttl WlOSCAPE PLAHS wssIolULCII All PAHTlHG BEDS TO J OCPTl1 lM1l
FQR WoT WttO llNRI R lIIITll NO F18ER IUlT WEED 8AARJ R AU MRGREEH AH OEClQUClUS TIlErS TO
RECENt OCEP StiREOOEO kAAOWOOQ WA0l IIITIol 1olO WUlC04 IN CONTACT lfJH TIl TRINl
TIlEE STAIINC IT SI10lti at TIi CONrFlACTOR S IlESPONS8IU1Y TO STM ANO OIf GVY THE TRUS ACCOFlOINC TO
flo OETAS IT 1 Tlt COHTRACTORS RSPONSlIllUTY TO TME MRY STEP HEClSSAAT TO IUoINTAiN THE lRSAHO
SHRUBS IN UIlt1QTAAO PlWB COIOTION A T AUTlWES UHTll TliE EJl Of lHPlANT GlJNlUlTPRII
ESPEClAUY WHERE YNlOAlJSW SOIlOR WlD CONCIfTIONS NlE A PROEllEW
TIlEE WlW1ING WlW1lNG WA TERIALS SlWJ 8 QUAUTY VY IIIAlLRPROOf CFl PE P EIl WoNUOCTURED rOIl
THS PURPOSE WIW ALL OEClOUOUS TR ES PlAlTEO IN THE rw PRIIR TO 12 1 REJlOV AU NC MTER
CONIFEROUS TREES
NOTES
CQNIrRTOtiAYfStlIlEOOCO llWOOIWUlCHUNlESS olLOOltlERwlS
NO YUlC TO II IN CONTACT 1IIfTH TllI
SCAIl1rY9QlTQI ooStOE SOfolUPRtQllTOPlNffiNC
lWOAll R l wfTH005Of TRE STAKlNCNl ElLUSTJV rED
lTlS OR SOPTIONTOSTAKETRSHOWYRTCOfffilACTOIlI
RESPONS 8LE fQfi TAlNlNC fR S IN A PUtoIll POSITION THIlOUCHCllJT THE
GuoRANTfl PElllOO
SHRUB
oouau STltANO 14 GA W1R
J 0 120 INTERVAlS TYP
16 POl YfIlOP lUNEOl
POlYRTliYlENE 40 loIIL 1 1 2
WlOESTIlAPTYP T S ti
RUEIl TO PlAN
SUlCRIDE
CEtI RINOf SHRU8 IN 9
O
OE gJE lMR
fACCINC OIoE PER lIRE
l UlCIl 4 OEEP SHREDOCO llARK
ROOT8AU TO SlT ON SuecAAOE
PANni fC SOl SE SPEC
TOPSOl
2 02 24
AfAliCl
NOlL
rWOALlJl T WlHIQsor
TREE STAI lfolC AAllLVSTllArrl
ITISflCQOTRAGTQIISOPTION
TOSTAI IREESHQIiVRTliE
C OR IS RESPCIHSlBLErOR
TAININC TREESINApUtIJ
POSITION THRCIUGlOUTTc
ClWWoTEEP RIOO
SCARIr 9OnoANOSlSOf
PRlORTOPlAHTINC
OOV9lE STAANO 14GAE
J 0 120 INTERVAlSTYP
U POlYPROPYlENEOR
POi llTHYU E 40IolIL112
WlOCSTRIPTYP
TREEIfPN TO nRSTElAANCH
U1CH 4 QEPSlIREDOEOIAAIC
IIOOTBAIJ TO SITONSU81lAO
fVCCING ONEPEAWlR
PlNlntIC SOlssPEc
24 WOOOSTAIESETj
ATAliCLE
SOD
SO
DECIDUOUS TREES
i
i
HALLA NURSERY
A1 P902
LANDSCAPING PLAN
10000 GREAT PlAINS BLVD
CHANHASSEN MINNESOTA
scflTtIl IlNtA WJNG 1
Al P902 C3 i
1 O nIOIOllO CAOllnulOllr A 11tOlC3
1 11 0
1 11 0
1 11 0
1 byctif IIolllO plan iflCOtCIt
IKI E fIotrS 0flAIIlNC liOS Nl1 BNPu8USHUI 0 001pr pori bJ K 6i 1 pM
1lIOfl
It 10 0 1M Slot 0 101 110I0 R IlUOOY
lHUWI or 5 OROIfIIoIG TH IlORROWEIl PflUISES oceu
NfOAGREESTORETVRNITUIONRECUESTAHll tOlS
WU Rt
C 1lWl
UStIIPOIlN PVRfIOSEOfl UJWlNWNCMITIS
1IIlNISHE0 KACHEY
CIJ
Mobile
MINNEAPOLIS MARKET
Ji
IllYlSlOlODUc
lSSluOfOR CONSTRUCTON
RlOCATEtlUASE 0
RELOCATED wsENO
Dl TI
I I HO
24 1101
J 10 3W
322
I
I
I
I I
o Oll AtlUl IOllIIl
CUI l IoII Ut to
a r t l cl1 I
u IIf ros c
JItISOOIo a lI e IO ott1rl11 J
HJ COofIICI taJTD 1 n
lXf OIl tos TlWOi Ol1I1U
OCCllO JI cu a K1I IOC O
l K NIt 1 all CIIIUoOlc 1Ila 1IIft 1IRfCttII
llGfall H MlCOlnIOC1llll11OU IUTQlltTo y
1 CO K UOU1lol P1lI 1
lVOl OUClll lCUnfllU lK
oxuao OP RL
r xil 1f
tDWI 000
t
1 n t3
lOOoilUl IlJI ou r T
lIIJSrII OIDt CN1IftIl
WJlltlVlOD IOTW OIrat aoJlS N I
II i111
1 T ClOtJl3IIIItItIlia llIlot rw 4lV1101
CUI ot on r aIIl loOIlIJA 4 lW1VOI It coos UIlrt
l HCUlIouoal Y OoI1WUl
901
1 OU OI rtllloOCAl as l SO IJI
OO
a nn1I aOfnoolt COIP1lMO ore
ut rcrII
I00 ItOI toIClllllO suu crill JQ T IlOl
1C 5
u l fUlrOllO
J
vooa I1QOU O Qf
CO lIQIIl 10 I ou It JOT r3 un if II
O CO CIIt llClIlf ft1DIJOOoIlfIIi O1l jlOI01IIlneoo111
ti otc ll t
aooU CIla oaI IIlAIUtIlcogo
aotOl ul ll nor WoIStnroo K ju
gm 3d r 3
II Ita 1Jlr l a IICIIf
UXltfl O l Dj 0
OO JI NC oU
a jr5 J l
n fl 1 lIftlt Cr i JO I PIOMIN
lI I Yll OOMlDo oomtcWll l r6 Aft
S jt S h
c lIOCIt u rlOrQlMllQO C U4onlr11lCrLoIAaaoe
fll MCOUlIMO carsn
IoII c
0 r ltt C04B1UtTW lilt US
lDClO OQ c CO cnlNn
OC
U 1100 1Il IVau
n t w
OU IlI tfPOOl cr
TnRtl WA TrR POI 11ITlOtI PRfIFNT1nN PIAN
lrntllr OFINSTAllATION k AlNT1NAN T
n
Pe
tit 0I01OOItS w
1fOO000IU lCi owoallUI Ml tcllPOll
LolI UlII1I
o
IT olUlIO
II eaoou w O
M
M I W IT
CII fouahOl Ort
t1
Df 1IOIf w
lf CDl
m
m oouo oo
rIlOIlr cTr0411lCll1O sN 0
fU
g D C OQIIt a
III C1CNnIQl tll
HALLA NURSERY nA1P902
1 11 0 EROSION AND GRADING PLAN
1 17 0
10000 GREAT PLAINS BLVD Ii
1 11 0 CHANHASSEN MINNESOTA I g
OU A 1 P9024 3 I
lLlFOlC
SffTlFlClLSll l
rENt DlNLII
I
I
I
I
l
c
EXISTING
0000
ntSTJlC
I
s
E
CALL
8OJ lC C
11l1Ol1l4O lll1Io
O VIN SOI
rlllg
Crt WOfDoHllIlPOOo 1OI 1Qtj AlI PO Wf
oc JITlL 01011 rI Ii 011000 flIl O1L
ONE
CAlL q lQJRSBLfOR 0ICCc
GOPHER STATE
lWJIoIClTJSARt t 6 1 4 4 0002
lOlL fR 1 800 252 165
lieoPfftI1
1 1 1 Ll OU
ixJ V L 7
I tIL1JL lJD
0
fu
C
g
t Ib ce1if lIQl t plOIf pecifocaton D
s rAo p Ot O 1ooc1 g nII on
Mobile
l
I
t Eng
R RvooYCOOCNnAlUSONLVANftNCQHSIOAA11Ot0T
rnrLOIoiOf HISORAWING lloEBORllOWERPltOUtSES
NlOolClltESIORfT lRNrTUPQNIlOU SToNO IrGRS C WRTWITITUNOTBEREPROOVCUlCOPICIIlN1OIl
c
fURNoISHEO
1 6 2
HotoCI1T
MINNEAPOLIS MARKET QAI
s mo 1000 ru IG U
GRAVEL DRIVE SECTION
D K
ISSUEOfOACONSTRICT1l1l
RCtOCATOlU s lIRU
RLQCITUlUAS
OAll
1 1101
4 1 01
103Cl
323
II
I
cOO
0
nllPUREO
OOUBl llrD
OW
lllIlTEU OW
YElLOW
ll YElLOW
U
TRIPl 8UJ
I
AHlENNANl CouiAl CNU ROUIlUlolOlTS
NlTEN ClIlWCHU
l1PE CONNECTIOH wcnt P
ili 14 1 SillNIlX6SlOR2ol00
IlJ 145 15 11
fU US 5 8
TlolIIX 1l511l R2ll 0 0
112 US 1 S Il
II 145 15 8
lX Il R2 rr a
lii S 1 l Il
YI 5 I a
TW811 Il Il7W 120 0
Y 5 5 S
1 15 S
llIIlX llMIl R2W 120 0 12 14S 15 11
Io 45 15 a
TloIIll 16 R2 120 IT
YS 145 15 S
111 145 ISI
lJlBX 1l5111 R2lol 240 0
8l 145 15 1
84 I 15 1
TloIBX 16 R2 240 0
82 145 15 1
85 145 15 1
NIlX Bl111 R2101 240 IT
BIl 145 15 1
fOR ltRlNfOllIolATION IlEftRTO STAOIOARO NC 5S
CO
I
m
i Ilf Tt
I
T
uc
lMIN GND BAR rl
lHA 1YP
T lot09llCNlTENw5
rACINC24O
T IIOBU lOIPIlOfU
ANT N tlOUNTIN PAlTORlol
II
T OO
ftCINC24O
T IolO8lLLmTtNtoA
ACINC 120
flJfUAEClOOCUW
AhT HoS
flflIRECARRI 1l
fUTlJRECORRItR
umr NAS
I
t
0TIIO
ffi O
S
A QUIPWENT
CABllojrn
f
f loIOllll1 CPS
r
1 M 11
I II
1
t i
11U
nfjliIj
ljfJlJCJ
I
i
II T IISHoUBAACOAlluan
WOlfS
NTNNA c9lE I IIGTH5 HAV BEtH llET1l m BoSUlON lllESE
PlNS CIa LENGTHS USTtD ARE NPROX T NO AilE NOT
WTtHOE O TO BE VSOrOR floBRiCATIQIol OUt TO rRO CONDlT S
tCll WANTENNA CBL UIOGnlS REQUlR D V liARnwu LDlClHS
TABUlATED
2 ALLANTEHNoCOAXCAlIILSf09 COLMCOOCOATTHIlEE J
LOCATlOHS USING I WID PYC l CTRICAl TAPE
TOP or TOWR NoITtNIiA lCVL
B BASE Of TOWER
C Al81SCABlNcr Cfl POIHT
J A HENtWCOAX Coto8lES SHALL tJTUlGR O KITS GROUNOO
AT nlREE l POINtS or tOWER AS rouows
TOP Of TOWUI NorTtNI1UON Ol 1olIWj Y
COllNtCTCO TO lOWER
8 EIOlTQIl or TOWIf Of 010 ll lCAUY CTtO TO
GROUNO BAA
C AT 8TS cI8lhET CONNECTIOH POINT
4 AHTE fOR ucH SECTOR Sl1AIL Il SPACl AT NOT ILSS fkNj
lO O lpAAT
AH1EN seCTORS SHAll 8 loIAURO WITH TllUE HOIffH AS llOWN
ON lJSITE PNl NORTH IS2 EAST OF T1lI NOImI
v
T W09Ilt 6 0 MCt4ffi
rocr
J
ULTRA
sm
IsCTORICllf lDlClH Dio COlOIlCOllf
20 1CPSlll8J2A
@OUIPllNT
PlATTORW
U
j
@FVTVRET 1IKl8ILE
EOUlPloI HT PLA TTORIoIJ
EXPIoHSION
n@
L
Th IoI C
5
I
I
i
I
5
i
2
I
i
o
I
t
I
5
i
i
I
EQUlPtl Nl
j 1
I
i
i
HALLA NURSERY
A1 P902
ANTENNA INFO TOWER ELEVATION
11
P90Vo
0000 GREAT PlAINS BLVD
CHANHASSEN MINNESOTA
tJ1tl IDUoWING MlWllO
A1P902 A1
lIOllQ TtD 1UOIOClO CollOf1 IOCl
1 11 1
111 1
1 17 0iIIOT1CE1HISQIllIlMCKoSNOl9HPJ8lISHClANDpOdtoyOfddirK
IS 1H SOlL PIlOPR1TOf T eaL 1NNfNOUS ncl thot I m loIIy Uc d P EA9llLHlDHl100I151tooot IlRUooY
nc lflH lHSORoWINC fH IIClRROWEIIlPAOSCS
NOD tGI U TO AOlMl IT U IIl QU 5f oGIlEU
OR IIIICKOol C UER
usalfOAoHPIJRPOS OlHRnWoIMilCHITIS
fIRHISli D W HrCHEY
IUJIf
mO
Mobile
MARKETMINNEAPOLIS
J 1
A
C2
IS Df COHSTRUCTION
IIlUOCATEO lUsEAAO
IIlELOCAIEDlUsEAREA
1101
liO
OM
2
J
E
E
S
324
II
e o
e o
c
I
22 aJ41
SECTION
E
CEDAR FENCE DETAIL 3
C2
HALLA NURSERY
A1P902
FENCING SECTIONS AND DETAILS
oTIC TkSORA oWlNGHASHOTBNPU8USHOANO
ISMSOU PMOPtR1YOf t lloCI8lL tt N S
loWl ToM ISLLIITTOM IlOWRfORTlO
cONr1DorrWUSOtY ANO It COHSlOfOIl 01
E T wrC O
TfJWlU NOT8 IlEPROOUC O COPll UNTOR
OTWIlWlSE llISPOS O 01 OlRtCTYOil lNOORCTlY NOR
O
AHIf VIlPOS OMRTlWl llHlCHtTlS
Mobile
MINNEAPOLIS MARKET
325
IIlECTltICAlNorts
1 seE ANTENA CQA GIlOulOltiG SYSTElJ OCTM
TYP 2 ON srtIOARO US
2 C H Cl Coll CROUND I ns TO IASTR GROVNO
flUS AT BflOWR
J CONNECl eoIX GROUOKITS TO GROUND
BUS 1 TTOWER
4 CONN CT IHAG ND TO GROUND BUS AT
Tf1OW01
S ALlGROUNOING CONNECTIONS TO liE lolAOE USING
tCJY t S UNLESS OTHERWISE
t mR CROUNOIc O EQUlPloI NT SUPPORT STEL
ICE BRlOGEjcmOPY 1Nll WAVECUIOE SRlOCE sa
IJPlJCABLEPORTION OF DETAIl TYPE 2 SlMOAAD
QWC 25
1 EUClRtCAl CONlAACTOR TO PUU 8ONOlttC
I
I
20Ql EILCTRlCloIETER@
T WOBI E OASfnAAQ rOfl
UECTRIC IotUER OISCONcr moo @HOffWlENClOSUREPFlNlltlBY
CONTRACTOR
ffi
r
r l
rJJJJ
rI @tI rmntlI
I nrr
I I
1 @
7EE
t6
EE
CORNtRTYP
m
nlSTlNC
3 JID Awr IN 2 PYC CONDUlT anow
OR S mo CONOIJIT PER
3 S AWC
ONE LINE DIAGRAM
STANDARD 24DV
c
wi
or
RECPT
3 SUoLtm
JIe Awe
oSTING
GItOOooPER N
OllClL
REOUlllllfNTS
tQIES
1 CONTRACTORTOCOOROINAUANOVOlIfYUlUT
POWR R OUIREI OTS wITH VTlLJTY PIOOA
TO No CONSTRUCTIOfIi WOllo SEE ORAWlIIIG T1
FOA V11UTl AIol TELCO NOAWllOH
2 AILlOUlPllLHI AHD WAIUMl fVRNISl1ED MID
8Y CONTAAClOR UNlESS HOlUl
I
i
HALLA NURSERY
A1 P902
POWER ANO GROUNOING PLAN
1
AJMIOe I
1 oo GREAT PlAINS BLVD
CHANHASSEN MINNESOTA
IIOlO 1000AWING IIU
A1P902 E1
llOOQ TU TUOOClC CAOOlOO
1 11 0
1 17 0
u ENOnCETI1I5llRAWlNCIlASNOTBlVlIllftdiIoion
IS1W sou EATY fYT W08lL II NIUKIIJS tlall 60JJy u 11001 Jorlrdoll
iNIK llfOlSLL 10MIlOllItOWlOlIOllTMEIll l dlrlh lhoSIIofll IOI II RVOOlCONflOH1WUSOtfTNJINCOtoISlOAATlONor
TNCWIor TMS OfAWWG TN 8OIl1tOWE1I PIMlSES cocau
AND ACMES TO IITJIIN IT UPON IIEoum ANO AGIIEES
lWITITWLLNOTBEIIDIIOOUCtD COflED lDlTOII C IIIUR
sNOft
D
CUPn
o
Mobile
MINNEAPOLIS ARKET
r
IE llE
ISSVED lOR CONSTRUCT1ON
ROOC IIfDUASf AAA
lluoo TID lEAS AREA
1111 01
24 1501
J 1 JfG
326
Correspondence Packet
Memo from Greg Sticha re Review of Claims Paid dated November 16 2007
327
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952227 1190
Engineering
Phone 952227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952227 1110
Web Site
www cLchanhassen mn us
MEMORANDUM
TO Mayor
City Council
FROM Greg Sticha Finance Director f
DATE November 16 2007 tl
SUBJECT Review of Claims Paid
The following claims are submitted for review on November 26 2007
Check Numbers Amounts
134697 134849 1 138 098 23
Total All Claims 1 138 098 23
Attachments Check Summary
Check Detai I Report
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play328
CITY OF CHANHASSEN Accounts Payable Printed 11 16 2007 4
User danielle Checks by Date Summary by Check Number Summary
Check Number Vendor No Vendor Name Check Date Void Amount Check Amount
134697 3dspe 3D SPECIAL TIES 08 2007 0 00 133 15
34698 advexc Advanced Excavating 08 2007 0 00 1 000 00
34699 aggind AGGRESSIVE INDUSTRIES INC VOID 08 2007 588 5 0 00
134700 a1eair ALEX A R APP ARA TUS INC 08 2007 0 00 398 39
13470 ALLSTA ALL STAR WIRELESS I 1 08 2007 0 00 15 96
134702 altbus Alternative Business Furniture I 1 08 2007 0 00 1 288 65
134703 altreb ALTERNATOR REBUILD CO I 1 08 2007 0 00 5 00
134704 andedais DAISY ANDERSON I 1 08 2007 0 00 5 I 1 08
134705 ARAMAR ARAMARK 11 08 2007 0 00 217 58
134706 aspmil ASPEN MILLS I 1 08 2007 0 00 165 62
134707 attmob AT T Mobility I 1 08 2007 0 00 3 20
134708 ban for BANN FORMS TECHNOLOGY I 1 08 2007 0 00 372 59
134709 BBCar B B Carpet One I 1 08 2007 0 00 140 00
134710 BCATRA BCA TRAINING DEVELOPMENT 11 08 2007 0 00 5 00
134711 bercof BERRY COFFEE COMPANY 11 08 2007 0 00 38 50
134712 BOLMEN BOLTON MENK INC 11108 2007 0 00 5 247 25
134713 borsta BORDER STATES ELECTRIC SUPPLY 11 08 2007 0 00 165 52
134714 boytru Boyer Truck Parts 11 08 2007 0 00 108 86
134715 brotir BROWN S TIRE AUTO 11 08 2007 0 00 14 00
134716 cantin CANON FINANCIAL SERVICES INC 11 08 2007 0 00 753 88
134717 CARRED CARVER COUNTY RED CROSS 11 08 2007 0 00 175 00
134718 CARSWC CARVER SWCD 11 08 2007 0 00 1 127 50
134719 cartre CARVER COUNTY TREASURER I 1 08 2007 0 00 1 440 00
34720 catpar CATCO PARTS SERVICE I 1 08 2007 0 00 361 77
13472 cenene CENTERPOINT ENERGY MINNEGASCO 08 2007 0 00 2 046 02
134722 chacud Charles Cudd Company 08 2007 0 00 1 000 00
134723 CHAFLO CHANHASSEN FLORAL 08 2007 0 00 53 25
134724 chavet CHANHASSEN VETERINARY 11 08 2007 0 00 1 030 29
134725 copima COPY IMAGES INC 11 08 2007 0 00 393 52
134726 corexp CORPORATE EXPRESS 11 08 2007 0 00 87 27
134727 cubfoo CUB FOODS 11 08 2007 0 00 169 29
134728 dakmec Dakota Mechanical 11 08 2007 0 00 9166
134729 danka DANKA OFFICE IMAGING COMPANY 11 08 2007 0 00 822 38
134730 donsal DONALD SALVERDA ASSOCIATES 11 08 2007 0 00 9148
134731 DUNRIT DUNN RITE SHOES REPAIR 11108 2007 0 00 99 99
134732 emeaut EMERGENCY AUTOMOTIVE TECH INC 11 08 2007 0 00 42 92
134733 FACMOT FACTORY MOTOR PARTS COMPANY 11108 2007 0 00 96 14
134734 WemJudy Judy Werner Foley 11108 2007 0 00 80 00
134735 forame FORCE AMERICA 1NC 11 08 2007 0 00 85 34
134736 fshcom FSH COMMUNICATIONS LLC 11108 2007 0 00 127 80
134737 gerhtodd TODD GERHARDT 11 08 2007 0 00 1 1094
134738 geskgreg GREGG GESKE 11 08 2007 0 00 58 71
134739 gopsta GOPHER STATE ONE CALL INC 11 08 2007 0 00 957 00
134740 GRABAY Grays Bay Builders Inc I 1108 2007 0 00 500 00
134741 hach Hach Company I 1108 2007 0 00 89 20
134742 HDsup HD Supply Waterworks L TD I 1 08 2007 0 00 3 479 57
134743 hentec HENNEPIN TECHNICAL COLLEGE I 1 08 2007 0 00 1 435 14
134744 ICMART ICMA RETIREMENT AND TRUST 457 11 08 2007 0 00 1 915 00
134745 janekell KELLEY JANES 11 08 2007 0 00 8 00
134746 JHLAR JH LARSON COMPANY 11 08 2007 0 00 238 52
134747 jimbro JIM BROWN S CULTURED SOD FARM 1 08 2007 0 00 269 5
134748 Ieamin LEAGUE OF MINNESOTA CITIES 1 08 2007 0 00 875 00
134749 MACEQU MACQUEEN EQUIPMENT 11 08 2007 0 00 2 343 5
134750 MERACE MERLlNS ACE HARDWARE 11 08 2007 0 00 1 92 1 23
134751 METC02 METROPOLITAN COUNCIL 11 08 2007 0 00 116450 37
134752 mettir METRO FIRE 11 08 2007 0 00 185 12
134753 midpla MIDWEST PLA YSCAPES 11 08 2007 0 00 436 65
134754 MINRUR MINNESOTA RURAL WATER ASSN 11108 2007 0 00 75 00
134755 MNCHIL MN CHILD SUPPORT PAYMENT CTR 11 08 2007 0 00 535 76
134756 MSRS MSRS 11 08 2007 0 00 16 974 65
134757 mvec MN V ALLEY ELECTRIC COOP 11 08 2007 0 00 1 810 06
134758 nahashel Shelley Nahan 11108 2007 0 00 125 00
Page 1
329
CITY OF CHANHASSEN Accounts Payable Printed 11 16 2007 11 41
User danielle Checks by Date Summary by Check Number Summary
Check Number Vendor No Vendor Name Check Date Void Amount Check Amount
134759 NA TRET NAT ONWIDE RET REMENT SOLUTION 08 2007 0 00 5 377 09
134760 NCPERS MN NCPERS LIFE NSURANCE 11 08 2007 0 00 16 00
134761 nextel NEXTEL 11 08 2007 0 00 2 746 87
134762 oehmpaul PAUL OEHME 11 08 2007 0 00 5 82
134763 olypoo Olympic Pools 11 08 2007 0 00 500 00
134764 oreaut O RE LLY AUTOMOT VE NC 1 08 2007 0 00 45 06
134765 poscon Positive Connections 08 2007 0 00 42 20
134766 POWCHA POWER SYSTEMS 08 2007 0 00 8 50
134767 protur PROFESS ONAL TURF RENOVAT ON 11 08 2007 0 00 3 220 56
134768 quacon QUANTUM CONTROLS NC VOID 08 2007 5 214 24 0 00
134769 rbmser RBM SERVICES NC 1108 2007 0 00 4 789 97
134770 reloff Reliable Office Supplies 08 2007 0 00 84 87
134771 ridymc RIDGEDALE YMCA 11 08 2007 0 00 4 108 00
134772 R ESFRED Riese Family Properties LLC I 1108 2007 0 00 1 074 93
134773 roypn ROY AL PR NT GROUP NC 11 08 2007 0 00 378 08
134774 rrmar R R MAR NE 11 08 2007 0 00 13 69
134775 ryahom Ryan Homes nc I 1 08 2007 0 00 1 000 00
134776 sand vane Vanessa Sanders I 1 08 2007 0 00 45 00
134777 SCHMDEANDEAN SCHM EG 11 08 2007 0 00 1 522 80
134778 shotru SHOREWOOD TRUE VALUE 11 08 2007 0 00 13 88
134779 SWWC SW WC Service Cooperatives 11 08 2007 0 00 47 641 00
134780 tecgra TECHNAGRAPH CS 11 08 2007 0 00 325 79
134781 thomkim Kim Thomas 11 08 2007 0 00 39 00
134782 TW C T TW N CITY WATER CLlN C NC 11 08 2007 0 00 65 00
134783 UB 00097 GREGORY CARLSON 11 08 2007 0 00 27 97
134784 UB 00098 DENN S RUTH CHADDERDON 08 2007 0 00 6 8 05
134785 UN WAY UNITED WAY 11 08 2007 0 00 42 00
134786 VER lO VER lON W RELESS 11 08 2007 0 00 10 90
134787 VERM N VERMEER OF M NNESOTA I 1 08 2007 0 00 9 33
134788 wasman WASTE MANAGEMENT SAVAGE 11 08 2007 0 00 676 57
134789 wilnur WILSON S NURSERY NC 108 2007 0 00 8 850 00
134790 wsb WSB ASSOC ATES NC I 08 2007 0 00 3424 25
134791 WWGRA WW GRA NGER NC 11 08 2007 0 00 305 17
134792 xcel XCELENERGY NC 11 08 2007 0 00 38 216 55
134793 lACKS lACK S NC I 1 08 2007 0 00 78942
134794 l EGLE ZIEGLER INC I 1 08 2007 0 00 1 64 1 00
134795 AGGRIN AGGREGA TE NDUSTRIES I 1 08 2007 0 00 588 15
134796 MVEC MN V ALLEY ELECTR C COOP I 1 08 2007 0 00 2 372 64
134797 NCPERS MN NCPERS LIFE NSURANCE I 1 08 2007 0 00 32 00
134798 qualcon Quality Control Integration I 1 08 2007 0 00 3 727 50
134799 AARP AARP 1115 2007 0 00 180 00
134800 aleair ALEX AIR APPARATUS NC 11 15 2007 0 00 993 27
134801 BarEng Barr Engineering Company 11115 2007 0 00 9 250 00
134802 BENPRO BEN EK PROPERTY SERVICES INC 115 2007 0 00 825 38
134803 CAMKNU CAMPBELL KNUTSON 15 2007 0 00 10 786 34
134804 CARTRE CARVER COUNTY TREASURER 15 2007 0 00 602447 55
134805 CARTRE CARVER COUNTY TREASURER 15 2007 0 00 2125
134806 CCFDMA CCFDMAA 15 2007 0 00 43 00
134807 CEMPRO CEMSTONEPRODUCTSCO 115 2007 0 00 7540
134808 CENENE CENTERPO NT ENERGY MINNEGASCO 115 2007 0 00 460 1 I
134809 CHABU CHASKA BUILDING CENTER 1115 2007 0 00 62 63
1348 I 0 choice Choice Inc 15 2007 0 00 206 20
13481 I DeepRock Deep Rock Water Company 11115 2007 0 00 6 71
134812 earand EARL F ANDERSEN NC 15 2007 0 00 469 25
134813 EHLERS EHLERS ASSOC ATES NC 1 15 2007 0 00 3 195 00
134814 emeaut EMERGENCY AUTOMOTIVE TECH NC 11115 2007 0 00 19 28
134815 facmot FACTORY MOTOR PARTS COMPANY 11115 2007 0 00 68 82
134816 forame FORCE AMER CA NC 11115 2007 0 00 4245
134817 gamtim GAMET ME 11115 2007 0 00 465 38
134818 HA WCHE HA WK NS CHEMICAL I 1115 2007 0 00 1 521 11
134819 HECKMACHHecksel Machine nc 1115 2007 0 00 96 65
134820 hoothr Hoops Threads 11115 2007 0 00 653 50
Page 2
330
CITY OF CHANHASSEN Accounts Payable Printed 111 6 2007 11 41
User danielle Checks by Date Summary by Check Number Summary
Check Number Vendor No Vendor Name Check Date Void Amount Check Amount
134821 imppor IMPERIAL PORTA PALACE 111 5 2007 0 00 907 22
134822 indian INDOOR LANDSCAPES INC 111 5 2007 0 00 199 16
134823 klmcng KLM ENGINEERING INC 111 5 2007 0 00 9 650 00
134824 labsaf LAB SAFETY SUPPLY 1115 2007 0 00 25 50
134825 Iyncam LYNCH CAMPS INC 111 5 2007 0 00 1 404 00
134826 madjoh MADSEN JOHNSON CORPORATION 111 5 2007 0 00 115 000 00
134827 metco Metropolitan Council Env Svcs 11 15 2007 0 00 18 240 75
134828 mnlabo MN DEPT OF LABOR AND INDUSTRY 111 5 2007 0 00 5 955 81
134829 moomed MOORE MEDICAL 1115 2007 0 00 36347
134830 mvec MN V ALLEY ELECTRIC COOP 111 5 2007 0 00 180 17
134831 patco PATRICK CO 111 5 2007 0 00 139 19
134832 POWCHA POWER SYSTEMS 111 5 2007 0 00 92 02
134833 qualcon Quality Control Integration 111 5 2007 0 00 2 733 54
134834 quill QUILL CORPORATION 11 15 2007 0 00 238 96
134835 qwcst QWEST 111 5 2007 0 00 6842
134836 ridmed RlDGEVIEW MEDICAL CENTER 11 15 2007 0 00 433 50
134837 SANCJAZM Jazmine Sanchez 111 5 2007 0 00 8 36
134838 SAVSUP SA VOlE SUPPLY CO INC 111 5 2007 0 00 85 05
134839 SOUSUB SOUTHWEST SUBURBAN PUBLISHING 111 5 2007 0 00 2 313 04
134840 TFSTRIKE T F Striker 1115 2007 0 00 600 00
134841 twicit TWIN CITY WATER CLINIC INC VOID 1115 2007 850 00 0 00
134842 UNIMIN UNIVERSITY OF MINNESOTA 111 5 2007 0 00 170 00
134843 usablu USA BLUE BOOK 111 5 2007 0 00 4048
134844 VALRIC VALLEY RICH CO INC 111 5 2007 0 00 7 488 26
134845 VERIZO VERIZON WIRELESS 111 5 2007 0 00 27 93
134846 wenck WENCK ASSOCIATES INC 1 1 15 2007 0 00 1 59840
134847 WWGRA WW GRAINGER INC 11 15 2007 0 00 281 04
134848 xcel XCEL ENERGY INC 1 1 15 2007 0 00 28 122 07
134849 ZOERPEGG PEGGIE ZOERHOF 111 5 2007 0 00 933 10
Report Total 6 652 39 38 098 23
Page 3
331
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 6 07 11 42
Amount
3D SPECIALTIES
3dspe 3D SPECIALTIES
Ck 34697 11 08 07
Inv 425662
Line Item Date
10 25 07
Inv 425662 Total
Line Item Description
Raincoat Rainpant
Line Item Account
101 1550 4 20 133 15
133 15
Ck 134697 Total 133 15
3dspe 3D SPECIALTIES 133 15
3D SPECIALTIES 133 15
AARP
AARP AARP
Ck 134799 11 15 07
Inv 11082007
Line Item Date Line Item Description
I 1 08 07 Defensive Driving I 1 8 07
Inv I 1082007 Total
Line Item Account
101 1560 4300 180 00
180 00
Ck 134799 Total 180 00
AARP AARP 180 00
AARP 180 00
Advanced Excavating
advexc Advanced Excavating
Ck 134698 11 08 07
lnv 970 I FlintlockTr
Line Item Date Line Item Description
11 07 07 Grading Escrow 9701 Flintlock Trail
Inv 9701 FlintlockTr Total
Line Item Account
8 I 5 8203 2024 1 000 00
1 000 00
Ck 134698 Total 1 000 00
advexc Advanced Excavating 1 000 00
Advanced Excavating 1 000 00
AGGREGATE INDUSTRIES
AGGRIN AGGREGATE INDUSTRIES
Ck 134795 11 08 07
Inv 4207911
Line Item Date Line Item Description
10 26 07 handcurb
Inv 4207911 Total
Line Item Account
101 1320 4540 588 15
588 15
Ck 134795 Total 588 15
AGGRIN AGGREGATE INDUSTRIES 588 15
AGGREGATE INDUSTRIES 588 15
Page I
332
CITY OF CHANHAS
User danielle
ALEX AIR APPARATUS INC
aleair ALEX AIR APPARATUS INC
Ck 134700 11 08 07
Inv 13274
Line tern Date
11 01 07
Inv 13274 Total
Ck 134700 Total
Ck 134800
Inv 13319
Line Item Date
11 07 07
lnv 13319 Total
Ck 134800 Total
aleair
Line Item Description
queset turnout gear V suspender
11 15 07
Line Item Description
sentinel exchange
ALEX AIR APPARATUS INC
ALEX AIR APPARATUS INC
ALL STAR WIRELESS
ALLSTA ALL STAR WIRELESS
Ck 13470 I 11 08 07
In 142181005157
Line Item Date Line Item Description
09 0707 Holster
Inv 142181005157 Total
Ck 13470 I Total
ALLSTA
ALL STAR WIRELESS
ALL STAR WIRELESS
Alternative Business Furniture
altbus Alternative Business Furniture
Ck 134702 11 08 07
Inv 29275
Line Item Date
10 11 07
Inv 29275 Total
Ck 134702 Total
altbus
Line Item Description
legs toggles brackets wall track
Alternative Business Furniture
Alternative Business Furniture
ALTERNATOR REBUILD CO
altreb ALTERNATOR REBUILD CO
Ck 134703 11 08 07
Inv 39940
Line Item Date
10 1607
Inv 39940 Total
Line Item Description
starter parts
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 11 42
Amount
Line Item Account
400 4105 4705 1 398 39
1 39839
1 398 39
Line Item Account
101 1220 4530 993 27
993 27
993 27
2 391 66
2 391 66
Line Item Account
700 0000 43 10 15 96
15 96
15 96
15 96
15 96
Line Item Account
101 1170 4110 1 288 65
1 288 65
1 288 65
1 288 65
1 288 65
Line Item Account
101 1320 4120 5 00
5 00
Page 2
333
CITY OF CHANHAS
User danielle
Ck 134703 Total
Accounts Payable
Check Detail Report Detail
Printed 1116 07 11 42
Amount
5 00
5 00ALTERNATORREBUILDCO
5 00
altrcb
ALTERNATOR REBUILD CO
ANDERSON DAISY
andcdais ANDERSON DAISY
Ck 134704 1108 07
In 10192007
Line Item Date Line Item Description
10 19 07 Fitness Center Equipment
In 10192007 Total
Ck 134704 Total
andcdais ANDERSON DAISY
ANDERSON DAISY
ARAMARK
ARAMAR ARAllARK Account
Ck 134705 11 0807
In 608911
Line Item Date
11 01 07
In 608911 Total
101 1170 4110
Line Item Description
cream sugar coffee cups
Ck 134705 Total
ARAMAR ARAMARK
ARAI1ARK
ASPEN MILLS
aspmil ASPEN MILLS
Ck 134706 11 08 07
In 77336
Line Item Date
10 30 07
In 77336 Total
Line Item Description
shirt embroidery patches
Ck 134706 Total
asp mil ASPEN 1 1ILLS
ASPEN MILLS
AT T 1 1obility
attmob AT T Mobility
Ck 134707 11 0807
In 871186097
Line Item Date Line Item Description
10 21 07 cell phone
Inv 871186097 Total
Ck 134707 Total
Line Item Account
101 1220 4120 511 08
511 08
511 08
51 1 08
511 08
Line Item Account
101 1170 4110 217 58
217 58
217 58
217 58
217 58
Line Item Account
10 1220 4240 165 62
165 62
165 62
165 62
165 62
Line Item Account
101 1310 4310 3 20
3 20
3 20
Page 3
334
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 1142
attmob AT T Mobility
Amount
3 20
AT T 1 1obility 3 20
B B Carpet One
BBCar B B Carpet One
Ck 134709 11 08107
Inv cg71 1983
Line Item Date Line Item DescriPtion
1011 07 repair of carpet
Inv eg711983 Total
Line Item Account
101 1170 4510 140 00
140 00
Ck 134709 Total 140 00
BBCar B B Carpet One 140 00
B B Carpet One 140 00
BANN FORI IS TECHNOLOGY
banfor BANN FORMS TECHNOLOGY
Ck 134708 11 08 07
Iny 14246
Line Item Date
10 31 07
Inv 14246 Total
Line Item Description
Building Inspection Report
Line Item Account
101 1250 4340 1 372 59
1 372 59
Ck 134708 Total 1 372 59
hanfor BANNFORMSTECHNOLOGY 1 372 59
BANN FORI IS TECHNOLOGY 1 372 59
Barr Engineering Company
BarEng Barr Engineering Company
Ck 13480 I 1115 07
nv 23100943
Line Item Date Line Item Description
10 25107 Modeling of City Well Field
Iny 23100943 Total
Line Item Account
700 0000 4300 9 250 00
9 250 00
Ck 134801 Total 9 250 00
BarEng Barr Engineering Company 9 250 00
Barr Engineering Company 9 250 00
BCA TRAINING DEVELOPMENT
BCATRA BCA TRAINING DEVELOPMENT
Ck 134710 11 08107
Inv 11062007
Line tern Date Line Item Description
11106107 background investigation new employee
Iny 11062007 Total
Line Item Account
101 1120 4300 15 00
15 00
Ck 134710 Total 15 00
BCATRA BCA TRAINING DEVELOPMENT 15 00
Page 4
335
CITY OF CHANHAS
User danielle
BCA TRAIING DEVELOPMENT
BENIEK PROPERTY SERVICES INC
BEN PRO BENIEK PROPERTY SERVICES INC
Ck 134802 II II 5107
Iny 130799
Line Item Date
10 12 07
lny 130799 Total
Line Item Description
mowing trimming
Iny 130915
Line Item Date
1106107
lny 130915 Total
Line Item Description
mowing trimming
n 134802 Total
BENPRO
Accounts Payable
Check Detail Report Detail
Printed 1116 07 1142
Amount
15 00
Line Item Account
101 1260 4300 718 88
718 88
Line Item Account
10 1 1120 4300 106 50
106 50
825 38
BENIEK PROPERTY SERVICES INC
825 38BENIEKPROPERTYSERVICESINC
BERRY COFFEE COI1PA Y
bereof BERRY COFFEE COMPANY
Ck 134711 11 08107
Iny 679403
Line Item Date
I 105 07
Iny 679403 Total
Line Item Description
gourmet coffee
Ck 13471 I Total
bereof BERRY COFFEE COMPANY
BERRY COFFEE COMPANY
BOLTON IIENK INC
BOLMEN BOLTON MENK INC
Ck 134712 11 08 07
Iny 0110730
Line Item Date Line Item Description
10 1907 Koehnen Area Improyements
Iny 0 I 10730 Total
Ck 134712 Total
BOLI1EN BOLTON 1 1ENK INC
BOLTON 11ENK INC
BORDER STATES ELECTRIC SUPPLY
borsta BORDER STATES ELECTRIC SUPPLY
Ck 134713 11 08107
InY 97169516
Line Item Date Line Item Description
10 31 07 quad hpsbal driller toggle
lny 97169516 Total
825 38
Line Item Account
0 1 1560 4130 138 50
138 50
138 50
138 50
138 50
Line Item Account
601 6016 4752 5 247 25
5 247 25
5 247 25
5 247 25
5 247 25
Line Item Account
101 1220 4510 165 52
165 52
Page 5
336
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 11 42
Ck 134713 Total
Arnollnt
165 52
borsta BORDER STATES ELECTRIC SUPPLY 165 52
BORDER STATES ELECTRIC SUPPLY 165 52
Boyer Truck Parts
boytrll Boyer True Parts
Ck 134714 11 08 07
In 137371
Line Item Date
10 25 07
In 137371 Total
Line Item Description
belt drie
Line Item Account
101 1320 4120 30 32
30 32
Inv 40219sw
Line Item Date Line Item Description
10 30 07 battcry
Inv 40219sav Total
Line Item Account
101 1320 4140 78 54
78 54
Ck 134714 Total 108 86
boytru Boyer Truck Parts 108 86
Boyer Truck Parts 108 86
BROWN S TIRE AUTO
brotir BROWN S TIRE AUTO
Ck 134715 11 08 07
Inv 11012007
Line ItCIll Date Line Item Dcscription
1101 07 vehicle car wash
Inv 11012007 Total
Line Item Account
101 1250 4520 14 00
14 00
Ck 134715 Total 14 00
brotir BROWN S TIRE AUTO 14 00
BROWN S TIRE AUTO 14 00
CAMPBELL KNUTSON
CAMKNU CAMPBELL KNUTSON
Ck 134803 11 15 07
Inv l0312007
Line Itclll Datc Line Item Description
I J 1407 Legal Services
In 10312007 Total
Line Item Account
101 1140 4302 10 786 34
10 786 34
Ck 134803 Total 10 786 34
CAMKNU CAMPBELL KNUTSON 10 786 34
CAMPBELL KNUTSON 10 786 34
Page 6
337
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 11 42
Amount
CANON FINANCIAL SERVICES INC
canOn CANON FINANCIAL SERVICES INC
Ck 134716 11 08107
In 11012007
Line Item Date Line Item Description
1101 07 copier rent
Inv 11012007 Total
Line Item Account
01 1120 4410 753 88
753 88
n 13471G Total 753 88
canOn CANON FINANCIAL SERVICES INC 753 88
CANON FIliANCIAL SERVICES INC 753 88
CARLSOli GREGORY
UB 00097 CARLSON GREGORY
Ck 134783 11 08107
Inv
Line Item DatI
11107 07
1107 07
11 0707
11107 07
Inv Total
Line Itcm Description
Refund check
Refund check
Refund check
Refund check
Line Item Account
700 0000 2020
720 0000 2020
700 0000 2020
701 0000 2020
4 68
18 24
36 21
68 84
127 97
Ck 134783 Total 127 97
U6 00097 CARLSON GREGORY 127 97
CARLSON GREGORY 127 97
CARVER COUNTY RED CROSS
CARRED CARVER COUliTY RED CROSS
Ck 134717 1108 07
Inv 146
Line Item Date
10 22 07
Inv 146 Total
Line Item Description
Babysitting class supplics
Line Item Account
101 1731 4300 175 00
175 00
Ck 134717 Total 175 00
CAlmED CARVER COUNTY RED CROSS 175 00
CARVER COUliTY RED CROSS 175 00
CARVER COUNTY TREASURER
cHtre CARVER COUNTY TREASURER
Ck 134719 11 08107
Inv SHERIO00974
Line Item DatI Line Item Description
09 2G 07 Error in Forfeiture Reimb ease 06 27200
Inv SHERIO00974 Total
Line Item Account
01 1140 4302 1 440 00
1440 00
Ck 134719 Total 1440 00
n 134804 1115107
Inv sheri0009S9
Line Item Date Line Item Description
1010907 07 police contract 2nd half
Line Item Account
101 1210 4300 602 447 55
Page 7
338
CITY OF CHANHAS
User danielle
ny sheri000989 Total
Ck 34804 Total
Accounts Payable
Check Detail Report Detail
Printed 1 16 07 11 42
Amount
602447 55
602447 55
Ck 134805 11 15 07
InY 11142007
Line Item Date Line Item Description
114107 copies
Iny 1142007 Total
Ck 134805 Total
CARTRE
Line Item Account
101 50 4300 21 25
2125
21 25
CARVER COUNTY TREASURER 603 908 80
CARVER COUNTY TREASURER 603 908 80
CARVER SWCD
CARSWC CARVER SWCD
Ck 134718 1108107
Iny 1265
Line Item Date
10 2307
Iny 1265 Total
nY 1266
Line Item Date
10 23 07
Iny 1266 Total
Iny 1267
Line Item Date
10 23 07
Inv 1267 Total
In 268
Line Item Date
10 2307
Iny 1268 Total
ny 269
Line tern Date
10 23 07
Iny 269 Total
Inv 1270
Line tern Date
0 2307
Iny 270 Total
InY I27
Line Item Date
0 2307
ny 271 Total
Inv 1272
Line Item Date
1023 07
Inv 1272 Total
Line Item Description
Chanhassen High School
Line Item Account
720 0000 4300 220 00
220 00
Line Item Account
400 0000 1155 10 00
110 00
Line Item Account
400 0000 55 247 50
247 50
Line Item Account
720 0000 4300 55 00
55 00
Line Item Account
400 0000 155 82 50
82 50
Line Item Account
400 0000 1155 192 50
192 50
Line Item Account
400 0000 I 55 55 00
55 00
Line Item Account
400 0000 155 10 00
110 00
Page 8
Line Item Description
Liberty on Bluff Creek
Line Item Description
Lifetime Fitness
Line Item Description
SW Transit 212
Line tern Description
The Arbors
Line tern Description
The Preserve
Line Item Description
Arb Business Park 7th Lot
Line Item Description
Arb Business Park 7th Addition MAMAC
339
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 1 42
Amount
Iny 1273
Line Item Date
10 23 07
Inv 1273 Total
Line Item Description
Park Ride on Hwy 101
Line Item Account
720 0000 4300 55 00
55 00
Ck 134718 Total 1 127 50
CARSWC CARVER SWCD 1 127 50
CARVER SWCD 1 127 50
CATCO PARTS SERVICE
catpar CATCO PARTS SERVICE
Ck 134720 11 0807
lny 343960 I
Linc Item Date Linc Item Dcscription
10 25 07 parts end yokc shaft mud flap
Iny 3439601 Total
Line Item Account
101 1320 4140 361 77
36 I77
Ck 134720 Total 361 77
catpar CATCO PARTS SERVICE 361 77
C TCO PARTS SERVICE 361 77
CCFDlAA
CCFDlA CCFDlAA
n 134806 11 15 07
Iny 10102007
Linc Item Datc Linc Item Dcscription
10 1007 County Fair Prizes fire ext smoke det
Iny 10102007 Total
Line Item Account
101 1220 4130 43 00
43 00
Ck 134806 Total 43 00
CCFDIA CCFDMAA 43 00
CCFD1AA 43 00
CEMSTONEPRODUCTSCO
CEMPRO CElSTONE PRODUCTS CO
n 134807 11 15 07
Inv 1143513
Linc Item Datc Line Item Dcscription
10 26 07 street mInce hose asmbly xylene pg cu
Iny 1143513 Total
Line Item Account
101 1320 4540 7540
7540
Ck 134807 Total 7540
CDl PRO CEMSTONEPRODUCTSCO 75 40
CE lSTOEPRODUCTS CO 75 40
Page 9
340
CITY OF CHANHAS
Uscr daniellc
Accounts Payable
Chcck Dctail Report Detail
Printed 11 16 07 11 42
Amount
CENTERPOINT ENERGY MINNEGASCO
ccncnc CENTERPOINT ENERGY MINNEGASCO
Ck 134721 1 1 08 07
In 10292007
Linc Item Date Line Item Description
11 0 I 07 gas charges
11 01107 gas chargcs
11 01107 gas charges
1101 07 gas chargcs
In 10292007 Towl
Line Item Account
101 1550 4320
101 1170 4320
700 0000 4320
101 1190 4320
15 98
397 63
461 27
1 171 14
2 046 02
Ck 134721 Total 2 046 02
n 134808 11 15 07
In 11302007
Line Item Date Line Item Description
11 3007 gas charges
11 3007 gas charges
11 30 07 gas charges
11 30 07 gas charges
I 1 3007 gas charges
In 11302007 Total
Line Item Account
101 1551 4320
701 0000 4320
700 0000 4320
101 1370 4320
101 1220 4320
17 28
20 95
20 96
167 64
233 28
460 11
Ck 134808 Total 460 11
CENENE CENTERPOINT ENERGY 1 1INNEGASCO 2 506 13
CETERPOINT ENERGY I1JNNEGASCO 2 506 13
CIIADDERDODENNISRUTII
UB 00098 CIIADDERDON DENNIS RUTII
n 134784 1108 07
In
Line Itelll Date
1107 07
1107 07
In Total
Line Item Description
Rcfund check
Refund check
Line Item Account
701 0000 2020
701 0000 2020
12 09
605 96
618 05
Ck 134784 Total 618 05
UB 00098 CIIADDERDON DENNIS RUTH 618 05
CIIADDERDON DENNIS RUTII 618 05
CIIANIIASSEN FLORAL
CIIAFLO CIIANHASSEN FLORAL
Ck 134723 1108 07
In 10310738
Line Itclll Date Line Itcm Description
10 31 07 Plants Jerry Boucher
In 10310738 Total
Line Item Account
101 1110 4375 53 25
53 25
n 134723 Total 53 25
CIIAFLO CIIANHASSEN FLORAL 53 25
CIIAIIIASSEN FLORAL 53 25
Page 10
341
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 11 42
Amount
CIIANIIASSEN VETERINARY
chant CIIANIIASSEN VETERINARY
Ck 134724 11 08107
In 10262007
Line Item Date Line Item Description
10 26 07 Vet services
In 102 2007 Total
Line Item Account
101 1260 4300 1 030 29
1 030 29
n 134724 Total 1 030 29
chant CIIANIIASSEN VETERINARY 1 030 29
CIIANIIASSEN VETERINARY 1 030 29
Charles Cudrl Company
chacud Charles Curiri Company
Ck 134722 11108 07
Inv 8735 LakeRileyDr
Line Item Date Line Item Description
11 07 07 Erosion Escrow 8735 Lake Riley Dr
In 8735 LakeRileyDr Total
Line Item Account
8 5 8202 2024 250 00
250 00
In 8743LakeRileyDr
Line Itelll Date Line Itelll Description
1107 07 Erosion Escrow 8743 Lake Riley Dr
In 8743LakeRileyDr Total
Line Item Account
815 8202 2024 250 00
250 00
Inv 8847LakeRileyDr
Line Itelll Date Line Item Description
11 0707 Erosion Escrow 8847 Lake Riley Drive
In 8847LakeRilcyDr Total
Line Item Account
815 8202 2024 250 00
250 00
In 8855LakeRileyDr
Line Itelll Date Line Itelll Description
11 07 07 Erosion Escrow 8855 Lake Riley Drie
In 8855 LakeRileyDr Total
Line Item Account
815 8202 2024 250 00
250 00
n 134722 Total 1 000 00
chacud Charles Curld Company 1 000 00
Charles Cudd Company 1 000 00
CIIASKA BUILDING CENTER
CIIABUI CIIASKA BUILDING CENTER
Ck 134809 11115107
In 77621
Line Itclll Date
10 23 07
In 77621 Total
Line Item Description
sidewalk repair2x4s std btr
Line Item Account
101 1320 4120 26 86
26 86
In 78929
Line Item Date
10 26 07
In 78929 Total
Line Item Description
sidewalk streets 2x4s std btr rebar
Line Item Account
0 1 1320 4120 35 77
35 77
Ck 134809 Total 62 63
Page 11
342
CITY OF CHANHAS
User daniellc
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 11 42
CIIABUI CIIASKA BUILDING CENTER
Amount
62 63
CIIASKA BUILDING CENTER 62 63
Choice Inc
choice Choice Inc Account 101 1220 4350
n 134810 11115107
In 11022007
Line Item Date Line Item Description
11106107 Fire Station Cleaning
Inv 11022007 Total
Line Item Account
101 1220 4350 206 20
206 20
Ck 134810 Total 206 20
choice Choice Inc 206 20
Choice Inc 206 20
COPY IMAGES INC
copima COPY IMAGES INC
Ck 134725 11 08107
In 89982
Line Item Date
1105107
Inv 89982 Total
Line Item Description
copier mtnee
Line Item Account
101 1250 4530 393 52
393 52
Ck 134725 Total 393 52
copima COPY IMAGES INC 393 52
COPY 1i IAGES INC 393 52
CORPORATE EXPRESS
cor exp CORPORATE EXPRESS Account 101 1170 4110
n 134726 11 08107
Inv 82445659
Line Item Date Line Item Description
10 18107 office supplies
In 82445659 Total
Line Item Account
101 1170 4110 29 32
29 32
In 82475405
Line Item Date Line Item Description
10 19 07 office supplies
Inv 82475405 Total
Line Item Account
101 1170 4110 34 69
34 69
In 82475407
Line Item Date Line Item Description
10 19 07 office supplies
Inv 82475407 Total
Line Item Account
101 1170 4110 23 26
23 26
Ck 134726 Total 87 27
corexfl CORPORATE EXPRESS 87 27
CORPORATE EXPRESS 87 27
Page 12
343
CITY OF CHANHAS
User danielle
CUll FOODS
clIbfoo CUll FOODS
Ck 134727 II OSl7
Inv 101407
Line Item Date
11 0107
Inv 101407 Total
Linc Item Dcscription
Brcakfast for Open House
In 101707
Line Item Date
1101 07
Inv 101707 Total
Line Item Description
mise food supplies
Inv 10292007
Line Item Date Line Item Description
11101 07 Food for Office Meeting
Inv 10292007 Total
n 134727 Total
cllbfoo CUB FOODS
CUB FOODS
Dakota Icchanical
dakmec Dakota Iechanical
n 13472S 11 08107
Inv 200702713
Line Item Date
11107107
In 200702713
Line Item Description
rcfllnd permit overpayment
Tot lI
n 134728 Total
dakmec Dakota Mechanical
Dakota Mechanical
DANKA OFFICE l lAGIiGCOMPANY
danka DANK OFFICE IMAGING COMPANY
Ck 134729 11 08 07
Inv 705725S72
Line Item Date Line Item Description
10 31 i07 copier mtnce
In 705725S72 Total
Ck 134729 Total
danka
Accounts Payable
Check Detail Report Detail
Printed 1111 607 I 42
Amollnt
Line Item Account
101 1220 4375 35 50
35 50
Line Item Account
101 6 4 4130 47 27
47 27
Line Item Account
101 1220 4370 86 52
S6 52
169 29
169 29
169 29
Line Item Account
10 1250 4901 9166
9166
9166
91 66
91 66
Line Item Account
101 1120 4410 822 3S
S22 38
822 38
DAKA OFFICE II 1AGING COl lPANY
DANKA OFFICE IMAGING COMPANY
822 38
Dcep Rocl Water Company
DeepRock Deep Rock Water Company
n 134SI1 1I1I5i07
1m 10262007
Line Item Date
10 27 07
Line Item Description
cooler rcntal
822 38
Line Item Account
101 1550 4120 6 71
Page 13
344
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16107 1142
Inv 10262007 Total
Amonnt
6 71
Ck 134811 Total 6 71
DeepRoek Deep Roel Water Company 6 71
Deep Roel Water Company 6 71
DOALD SALVERDA ASSOCIATES
donsal DON LD SALVERDA ASSOCIATES
Ck 134730 11 0807
Inv p9703 c
Line Item Date Line Item Description
11101107 books
Iny p97031 c Total
Line Item Account
101 1120 4370 91 48
9148
n 134730 Total 9148
donsal DONALD SALVERDA ASSOCIATES 91 48
DONALD SALVERDA ASSOCIATES 91 48
DUNN RITE SIIOES REPAIH
DlINRIT DlINiRITE SIIOES REPAIH
Ck 134731 11 08 07
Inv 15808
Line Item Date
10 18107
Iny 15808 Total
Line Item Description
R wing work
Line Item Account
10 1 1320 4240 99 99
99 99
Ck 134731 Total 99 99
DUN RIT DUNN RITE SIIOES REPAIH 99 99
DlJN RITE SIIOES REPAIH 99 99
EARL F ANDERSEN INC
earand EARL F ANDERSEN INC
n 1348 J 2 11 1517
InY 0080 liIN
Line Item Date Line Item Description
10 31 07 sign plates
nv 00801611N Total
Line Item Accollnt
101 1320 4560 47 3
47 3
Inv 00801621N
Line Item Date Line Item Description
10 31107 sign plates stop vip channel posts
Iny 00801621N Total
Line Item Account
101 1320 4560 421 94
42 I94
Ck 1348 2 Total 469 25
earand EARL F ANDERSEN INC 469 25
EARL F ANDERSEN INC 469 25
Page 14
345
CITY OF CHANHAS
User danielle
Accounts Payable
Check Dctail Report Detail
Printed 11 16 07 II 42
Amount
EIILERS ASSOCIATES INC
EIILERS EHLERS ASSOCIATES INC
Ck 134813 11115107
Inv 335769
Line Item Date
I 0 I 7
Inv 335769 Total
Line Item Description
general Dinncr thcatrc rcdo TIF run
Line Item Account
lO 1 1120 4300 225 00
225 00
lnv 335944
Line Item Date
11112107
11 12 07
11 12107
Inv 335944 Total
Line Item Description
financial advisory services
financial advisory services
financial advisory services
Line Item Account
720 0000 4300
700 0000 4300
701 0000 4300
990 00
990 00
990 00
2 970 00
Ck 134813 Total 3 195 00
EIILERS EIILERS ASSOCIATES INC 3 195 00
EIILERS ASSOCIATES INC 3 195 00
Ei lERGENCY AUTOi lOTIVE TECIIINC
clllcaut EiIERGENCY AUTOi 10TIVE TECIIINC
Ck 134732 11 08 07
Inv jerl 023076a
Line Item Date Line Item Description
I 1102107 50 watt halogen bulb
Inv jer I 023076a Total
Line Item Account
101 1220 4140 42 92
42 92
Ck 134732 Total 42 92
Ck 134814 11 15 07
Inv jer I 023076
Linc Itcm Date Line Item Description
10 25 07 centurion I ights pin amp
Inv jer I 023076 Total
Line Item Account
101 1250 4140 19 28
19 28
Ck 134814 Total 19 28
cmcaut EMERGENCY AUTOi lOTIVE TECH INC 62 20
Ei IEI GENCY AUTOMOTIVE TECH INC 62 20
FACTORY i 10TOR PARTS COMPANY
FACi 10T FACTORY MOTOR PARTS COMPANY
Ck 134733 11 08107
Inv 6985610
Line Item Date Line Item Description
1101 07 60 SERIES BATT
Inv 69856 I 0 Total
Line Item Account
101 1320 4120 9G 14
9G 14
Ck 134733 Total 96 14
Ck 134815 11 15 07
Inv 6986720
Line Item Date Line Item Description
1107 07 switch
Inv 6986720 Total
Line Item Account
101 1220 4140 68 82
68 82
Page 15
346
CITY OF CHANflAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed II I 16 07 11 42
Ck 134815 Total
Amount
68 82
facll10t FACTORY MOTOR PARTS COMPANY 164 96
FACTORY JOTOR PARTS COMPAJY 164 96
FORCE AMERICA IJC
forame FORCE AIIERICA IJC
n 134735 11 08 07
In 0 1288521
Line Itelll Date
10 2317
In 01288521
Line Item Description
clement 0 ring support ring
Total
Line Item Account
101 1320 4 I 40 85 34
85 34
Ck 134735 Total 85 34
n 134816 11 15107
In 01289120
Line Item Date Line Item DescriPtion
I I O I 107 support ring
In 01289120 Total
Line Item Account
101 1320 4140 4245
42 45
n 134816 Total 4245
rorame FORCE AMERICA INC 127 79
FORCE AIERICA INC 127 79
FSII COMl llJNICATIONS LLC
rshcom FSII COMIIUNICATIONS LLC
Ck 134736 1I 0807
In 000157758
Line Item Date
11 01 07
In 000157758
Line Item Description
telephone charges
Total
Line Item Account
101 1540 4310 127 80
127 80
Ck 13473 Total 127 80
fshcom FSII COMMUNICATIONS LLC 127 80
FSII COIIIUNICATIONS LLC 127 80
GAIJETIME
al11tim GAl lETll lE
n 134817 1I 1507
Inv 751612
Line Item Date
10 29 07
In 751612 Total
Line Item Description
EI w lip rd window
Line Item Account
101 1550 4120 465 38
465 38
Ck 134817 Total 465 38
gamtim GAI lETlllE 465 38
GAIIETII IE 465 38
Page 16
347
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1116 07 1142
Amount
GERHARDT TODD
gerhtodd GERHARDT TODD
Ck 134737 11 08 07
Inv 052007
Line Item Date Line Item Description
11105 07 Air Travel
11 05107 car allowance November
Inv 11052007 Total
Line tern Account
491 0000 4370
101 20 4380
534 41
575 00
1 10941
Ck 134737 Total I I 094
gl rhtodd GERHARDT TODD 1 109 41
GERHARDT TODD 1 109 41
GESKE GREGG
geskgreg GESKE GREGG
Ck 134738 11 08 07
lnv 10092007
Line Itelll Date Line Itelll Description
1009 07 open house breakfast
In 0092007 Total
Line Item Account
101 1220 4370 58 71
58 71
Ck 134738 Total 58 7
gl sl grcg GESKE GREGG 58 71
GESKE GREGG 58 71
GOPHER STATE ONE CALL JNC
gopsta GOPHER STATE ONE CALL INC
Ck 134739 1I08 07
Inv 7 00372
Line Itelll Date Line Item Description
10 3 07 Utility locates
In 7100372 Total
Line Item Account
400 0000 4300 957 00
957 00
Ck 134739 Total 957 00
gopsta GOPHER STATE OfE CALL JNC 957 00
GOPHER STATE ONE CALL JNC 957 00
Grays Bay Builders Jnc
GRABA Y Gra s Bay Builders Jne
Ck 134740 108 07
Inv 8647StoneLn
Line Item Date Line Itelll Description
1110707 Erosion Escrow 8647 Stonefiled Lane
Inv 8647StoneLn Total
Line tern Account
815 8202 2024 500 00
500 00
Ck 134740 Tot t1 500 00
GRABAY Grays Bay Builders Jne 500 00
Grays Bay Builders Jill 500 00
Page 17
348
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detai
Printed 11 16 07 11 42
Amount
lIaeh Company
haeh IIaeh COlllpany
Ck 13474 11 08 07
Inv 5340157
Line Item Date Line Item Description
10 22 07 oxygen reagent
Inv 5340157 Total
Line Item Account
700 7019 4160 89 20
89 20
Ck 3474 Total 89 20
haeh Haeh COlllpany 89 20
lIaeh COlllpany 89 20
IIA WKINS CIIEMICAL
IIA wellE IIA WKINS CHEI1ICAL
Ck 134818 11 15107
Inv 1126723
Line Item Date Line Item Description
10 31 07 aOne 15 freight
lnv 120723 Total
Line Item Account
700 7019 4160 1 521 1
1 521 11
n 134818 Total 1 521 11
IIAWCIIE IIAWKINS CHEMICAL 1 521 11
IIA WKINS CIIEMICA L 1 52111
lID Supply Waterworks L TO
HDsup liD Supply Waterworks LTD
Ck 134742 11 08 07
Inv 6253179
Line telll Date Line Item Description
10 2M 7 Hidden Marsh Repair
Inv 6253179 Total
Line Item Account
700 0000 4552 3 479 57
3 479 57
Ck J 34742 Total 3 479 57
IIDsup liD Supply Waterworl s L TD 3 479 57
lID Supply Waterworks LTO 3 479 57
IIeeksell laehine Ine
IIECKlACII lIeeksel Machine Ine
Ck 134819 11115 07
Inv 70653
Line Item Date
10 25 07
Inv 76653 Total
Line Itelll Description
heavy wall tube
Line Item Account
101 1320 4120 90 65
90 65
Ck 134819 Tot ll 90 65
II ECKI1ACII IIeeksell1aehine Ine 96 65
lIecksell laehine Ine 96 65
Page I 8
349
CITY OF CHANIIAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed I J 16 07 1142
Amount
IIEiNEPIN TECHNICAL COLLEGE
helltec IIENNEPIN TECIINICAL COLLEGE
Ck I 347B 11 08107
n 11022007
Line Item Drne Line Item Description
11 02 07 online tuition Joseph l3erg
11 02 07 Tuition Daisy Anderson
In 11022007 Total
Line Item Account
101 1220 4370
101 1220 4370
492 93
942 21
1 435 14
n 134743 Total 1 435 14
helltec IIENNEPIN TECHNICAL COLLEGE 1 435 14
IIENNEPIN TECHNICAL COLLEGE 1 435 14
lIoops Threads
hoothr lIoops Threads
n 134820 11115 07
In 10302007
Line Itelll Date Line tem Description
10 30 07 buttondown jacket logos
In 10302007 Total
Line Item Account
101 1550 4240 653 50
653 50
Ck 134820 Total 653 50
hoothr lIoops Threads 653 50
lIoops Threads 653 50
ICIA RETIREMENT AND TRUST 457
IGIART ICMA RETIREI IENT AND TRUST 457
n 134744 11 08107
In
Line Item Date
1106 07
1106107
1100107
In Total
Line Item Description
PR l3ateh 409 II 2007 ICMA
PR l3ateh 409 II 2007 ICMA
PR l3ateh 409 I I 2007 CMA
Line Item Account
210 0000 2009
720 0000 2009
101 0000 2009
3125
100 00
1 783 75
1 915 00
Ck 134744 Total 1 915 00
1C IART ICMA RETIREMENT AND TRUST 457 1 915 00
1CIA HETIREIEiTAND TRUST 457 1 915 00
I II ERIAL PORTA PALACE
imppor IMPERIAL PORTA PALACE
Ck 134821 11 15 07
In 5948
Line Item Datc
1102107
In 5948 Total
Line Item Description
Soccer field rental portable restroom
Line Itcm Account
101 1550 4400 3 08
31 68
In 5949
Line Item Date
1102107
In 5940 Total
Line Item Description
rental portable restroom Lk Ann Lotus
Line Item Account
10 1550 4400 157 02
15702
Page 19
350
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 11 42
Amount
1m 5950
Line Itelll Date
1102 07
In 5950 Total
Line Itelll Description
rental port restroolll Bandimere City Ce
Line Item Account
101 1550 4400 135 26
135 26
Inv 5951
Line Itelll Date
1102107
Inv 5951 Total
Line Item Description
rental port restroom parks
Line Item Account
101 1550 4400 582 66
582 66
Ck 134821 Total 907 22
illlppor IMPERIAL PORTA PALACE 907 22
1 IPERIAL PORTA PALACE 907 22
INDOOR LANDSCAPES INC
indian INDOOR LANDSCAPES INC
Ck 134822 1111 5 07
InY 6951
Line Itelll Date
1101107
Inv 951 Total
Line Item Description
1 ovember Plant Service
Line Item Account
10 I 1 J 70 4110 199 16
199 16
Ck 134822 Total 199 16
indIan INDOOR LANDSCAPES INC 199 16
INDOOR LANOSCAPES INC 199 16
HNES KELLEY
jancl cll JANES KELLEY
Ck 134745 1108 07
Iny 103 I 2007
Iine Item Date Line Item Description
1013 I 07 Dell Parking A WNA Fall Conf
In 10312007 Total
Line Item Account
700 0000 4370 8 00
8 00
Ck 134745 Total 8 00
jancl ell JANES KELLEY 8 00
JANES KELLEY 8 00
HI LARSON COMPANY
1IILAR 111 LARSON COMPANY
Ck 134746 1108 07
InY 412384003
Iine telll Date
1011 07
In 412384003
Line Item Description
11 LO Cooper
Total
Line Item Account
101 1550 4150 238 52
238 52
Ck 13476Total 238 52
IIIL R 111 LARSON COMPANY 238 52
111 LARSOCOIPANY 238 52
Page 20
351
JIM BROWN S CULTURED SOD FARM
jimbro JIM BROWN S CULTURED SOD FARM
Ck 134747 11 08107
Inv 8963
Line Item Date
10 24 07
Inv 8963 Total
CITY OF CHANHAS
User daniellI
Ck 134747 Total
jimbro
Accounts Payable
Check Detai Report Detail
Printed 6 07 42
Amollnt
Line Item Dcscription
sod
Line Item Account
101 1550 4120 269 15
269 15
269 5
111 1 BROWN S CULTURED SOD FARM 269 15
1111 BROWN S CULTURED SOD FARM 269 15
1LI I ENGINEERIGINC
klmcng 1LI I ENGINEERING INC
Ck 134823 11 1507
In 3329
Line Item Date
1009 07
Inv 3329 Total
Inv 3334
Line Item Date
1011107
In 3334 Total
Ck 134823 Total
klmcng
Line Item DescriPtion
proj MN2397 antenna drawing rcicw
Linc Item Account
101 1120 4300 2 400 00
2400 00
line Item Description
inspection serices
Linc Item Account
101 1120 4300 7 250 00
7 250 00
9 650 00
1 1 1 1 ENGINEERING INC 9 650 00
1 LI I ENGINEERING INC 9 650 00
LAB SAFETY SUPPLY
labsaf LAB SAFETY SlIPPLY
Ck 134824 11115 07
Inv 1010422785
Line Ite111 Date
10 2507
In 1010422785
LEAGUE OF 1 1INlESOTA CITIES
Icamin LEAGUE OF 1 1INlESOTA CITIES
Ck 134748 11 0807
In 1000031935
Line Item Date
I O I 07
In 1000031935
Ck 134824 Total
labsaf
LAB SAFETY SUPPLY
Ck 134748 Total
Line Item Description
Idr glv select shldr Irg
Total
Line Item Account
101 1260 4240 25 50
25 50
25 50
LAB SAFETY SUPPLY 25 50
25 50
l ine Item Description
rvlCSC Fee
Total
Line Item Account
720 0000 4300 875 00
875 00
875 00
Page 21
352
CITY OF CHANHAS
User daniellc
Accounts Payable
Check Detail Report Detail
Printed 11116 07 11 42
Iramin LEAGUE OF MINNESOTA CITIES
Amollnt
875 00
LEAGUE OF l lINNESOTA CITIES 875 00
LYlCII CAIPS IlC
Iyncalll L ICII CAMPS INC
n 134825 11 1507
In 11142007
Line Item Date Line Item Description
11 1407 fall youth basketball clinic
Inv 11142007 Total
Line Item Account
101 730 4300 1404 00
1404 00
Ck 134825 Total 1 404 00
Iyncalll LYNCII CAMPS INC 1 404 00
L NCII CAIPS INC 1 404 00
IACQUEEEQUIPIENT
J CEQU J IACQUEEN EQUIPJ IENT
n U4749 11 08 07
1m 2076lJ01
Line Item Date Line Item Description
10 30107 aetor repair parts Jetter gun wand
In 1076902 Total
Line Item Account
701 0000 4140 2 343 51
2 343 51
n U4749 Total 2 343 51
i IACEQU MACQUEEN EQUIPMENT 2 343 51
J IACQUEEN EQUIPMENT 2 343 51
IAOSEN IOIINSON CORPORATION
Illalljoh i IAOSEN IOIINSON CORPORATION
n 134826 11 15107
In 08152007
Line Item Date Line Item Description
08 2507 Chan East Water Treatment Plant
In 08152007 Total
Line Item Account
700 70 4 4751 115 000 00
115 000 00
n 134816 Total I 15 000 00
Illalljoh JlADSEN IOIINSOCORPORATION 115 000 00
L OSEN IOIINSON CORPORATION 115 000 00
IERLlNS ACE IIARDWARE
IERACE lIERLlNS ACE IIARDWARE
Ck 134750 IIOS 07
In 10311007
Line Item Date
10 3 07
10 31 07
0 3 107
to 3107
10 3 I 07
10 31 07
10 3107
J 0 3 IO7
Line Item Description
supplies
supplies
supplies
suppl ies
supplies
supplies
supplies
suppl ies
Line Item Account
10 1310 4120
0 1220 4240
700 0000 4260
700 0000 4120
10 1220 4290
700 0000 4550
101 1250 4140
700 70 9 4552
4 16
5 81
7 27
12 60
13 58
16 93
17 6
24 83
Page 22
353
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed II II 6 07 II 42
10 3107 supplies
10 31 07 supplies
10 3 107 suppl ies
10 3 1107 suppl ies
1013 107 suppl ies
10 3107 suppl ies
10 3107 supplies
10 31 07 supplies
10 3107 supplies
Inv 10312007 Total
101 1260 4120
700 7019 4260
700 7019 4120
101 1370 4150
101 1220 4350
10 I 1320 4I 20
700 0000 4552
101 1550 4120
101 1550 4150
Amount
25 21
42 00
47 53
49 30
6543
195 38
200 72
330 76
862 10
1 921 23
n 134750 Total 1 921 23
lI RACE MERLlNS ACE IIARDWARE 1 92 23
IERLlNS ACE IIARDWARE 1 92 23
IETRO FIRE
nletfir 11ETRO FIRE
n 134752 1108 07
Inv 2 32
Line Item Date
10 3107
Inv 2 32 Total
Line Item Description
Replace sensor cell combustible
Line Item Account
101 1220 4530 185 12
185 12
n 134752 Total 185 12
nletfir 11ETRO FIRE 185 12
IE1 RO FIHE 185 12
IETROPOLlTAN COUNCIL
IE1 C02 i IETROPOLlTAN COUNCIL Account 701 0000 4509
Ck 134751 11 08 07
Inv 0000859990
Line Item Date Line Item Description
1102 07 waste water service Dee 2007
Inv OOOOSS9990 Total
Line Item Account
701 0000 4509 116 450 37
116450 37
n 134751 Total 116450 37
IETC02 METROPOLITAN COUNCIL 116 450 37
IETROPOLlTAN COUNCIL 116 450 37
I letropolitan Council EnSHS
Illetco 1 1etropolitan Council En Scs Account 101 1250 3816
Ck 134827 I I II 507
In 10312007
Line Item Date Line Item Description
10 31 07 October Sllrcharge
I J31 07 October Surcharge
In 10312007 Total
Line Item Account
101 1250 3816
701 0000 4509
184 25
18 425 00
18 240 75
n 134827 Total 18 240 75
Illeteo 11 etropolitan Council Env S es 18 240 75
Page 23
354
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed II J 6 07 II 42
Ilctropolit m Council EnSvcs
Amount
18 240 75
1 11 DWEST PLA YSCAPES
midpla MIDWEST PLA YSCAPES
n 134753 11 08 07
In 3454
Line Item Datc Line Item Description
10i26107 Tube side elbow V slots
In 3454 Total
Line Item Account
0 1550 4120 436 65
436 65
n 134753 Total 436 65
midpIa MIDWEST PLA YSCAPES 436 65
II DWEST PLA YSCA PES 436 65
IINNESOT1 RURAL WATER ASSN
IINRUR I II1NESOTA RURAL WATER ASSN
Ck 134754 11 0807
In 11072007
Line Item Date Line Item Dcseription
11 0707 Seminar Brett Martinson
In 11072007 Total
Line Item Account
700 0000 4370 75 00
75 00
n 134754 Total 75 00
UNRUR IIINNESOTA RURAL WATER ASSN 75 00
IINNESOTA RURAL WATER ASSN 75 00
IN CIIILD SUPPORT PA YI1ENT CTR
INCIIIL 111 1 CIIILD SUPPORT PA YI1ENT CTR
n 134755 1108 07
111
Line Item Date
II D 07
1I06 D7
In Total
Line Item Description
PR Batch 409 II 2007 Garnishment
PR Batch 409 II 2007 Garnishment
Line Item Account
10 0000 2006
700 0000 2006
34 61
501 15
535 76
n 134755 Total 535 7
INCIIIL 111 1 CIIILD SUPPORT PA YlENT CTR 535 76
111 CIIILD SUPPORT PA YI1ENT CTR 535 76
I I DEPT OF LABOR AND INDUSTRY
lllnlaho 1 111 DEPT OF LABOR AND INDUSTRY
n 134828 11 15107
111 103 2007
Line It1ll Date Line Item Description
10 3 07 October Surcharge
10 3 07 October Surcharge
In 10312007 Total
Line Item Account
101 1250 3818
101 0000 2022
121 55
6 077 36
5 955 81
n 134828 Total 5 955 81
mlllabo I1N DEPT OF LABOR AND INDUSTRY 5 955 81
Page 24
355
CITY OF CHANHAS
Uscr danicllc
Accounts Payable
Check Detail Report Detail
Printed 11 6 07 11 42
m OUT OF LABOR AND INDUSTRY
Amount
5 955 81
1 NCPERS LIFE INSURANCE
CPERS IN CPERS LIFE I SURAICE
n 134760 11 0807
Inv
Linc Itclll Datc
11 06 07
11 06 07
11 0607
Inv Total
n 134760 Total
n 134797
Inv 110807
Linc Itcm Datc
11 08 07
Inv 110807 Total
Ck 134797 Total
CPERS
Line Itclll Dcscription
PR Batch 409 II 2007 NCPERS life insurance
PR Batch 409 II 2007 NCPERS life insurance
PR Batch 409 II 2007 NCPERS lifc insurancc
Line Item Account
701 0000 20 II
700 0000 20 II
101 0000 20 II
1 60
1 6 I
12 79
16 00
16 00
II OS 07
Linc Itclll Dcscription
Dan RClllcr Cobra prclllium Oct Nov
Line Item Account
10 0000 20 1 32 00
32 00
32 00
i1N NCPERS LIFE INSURANCE 48 00
i IN NCPERS LIFE INSURANCE 48 00
1 VALLEY ELECTRIC COOP
111 CC 1 IN VALLEY ELECTRIC COOP
n 134757 IIOS 07
1m 09 I 2007
Linc Itclll Datc
09 I j 7
Im 091 l2007
Inv 10312007
Linc Itclll Datc
10 3 1 07
10 3 107
10 3 107
10 3107
Inv 10312007
n 134757 Total
Linc Itclll Dcscription
clcctricity chargcs
Total
Line Itcm Account
101 1350 4320 121 S0
121 80
Linc Itelll Description
clectricity charges
electricity charges
elcctricity charges
elcctricity charges
Total
Line Item Account
101 1600 4320
700 0000 4320
701 0000 4320
101 1350 4320
18 74
23 09
280 10
1 366 33
1 688 26
1 810 06
Ck 1347 II OS 07
Inv 110807
Line Itelll Datc Line Itclll Description
1108 07 Electricity chargcs
Inv II OS07 Total
Ck 1347 Total
n 134S30
Inv 11072007
Linc Itcm Datc
1107 07
1110707
Inv 11072007
Line ItCI11 Account
101 1350 4320 2 372 64
23 7264
2 372 64
1111507
Line Itcm Dcscription
clectric Novcmbcr acct 077S259800
clcctic Novcmbcr acct 0778268900
Total
Line Item Account
10 1350 4320
0 1350 4320
23 34
156 83
180 17
Pagc 25
356
CITY OF CHAHAS
User danielle
n 134830 Total
mnc
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 11 42
Amount
180 17
IN VALLEY ELECTRIC COOP 4 362 87
1 VALLEY ELECTRIC COOP 4 362 87
100RE l IEOICAL
moomed 100RE MEDICAL
Ck 134829 1111 5107
In 80721714EI
Line Item Date
l1105i7
Im 80721714EI
n 134829 Total
moollled
IOORE IIEDlCAL
SI S
I ISRS I ISRS
n 134756
In
Line Item Date
1106107
II OM 7
I I 10610 7
11 00 07
11 06107
11 07 07
11 06107
11106107
1106107
11106 07
1100107
11100 07
11106 07
1106 07
IIIOoi07
11 JGl07
IIIOo07
11 07107
11 06107
1110617
11 0 07
11 07
11 00107
11100107
11100107
11106 07
11 06 07
11 06 07
I 106 07
I I 1067
I J 106107
I J 06 07
J lI0607
II O 7
I 1 00107
Line Item Description
gloes advil soap bndgs
Total
Line Item Account
101 1220 4130 3634 7
3634 7
363A7
MOORE I IEDICAL 36347
36347
11 08107
Line Item Description
PR Batch 409 II 2007 Post Health 05 Emplr
PR Batch 409 I I 2007 Post Health 3 Emplr
PR Batch 409 I I 2007 Post Health 3 Emplr
PR Batch 409 11 2007 Post Health 05 Emplr
PR Batch 409 11 2007 Post Health 05 Emplr
PR Batch 499 I I 2007 Post Health I Emplr
PR Batch 409 I I 2007 Post Health 05 Emplr
PR Batch 409 I I 2007 Post Health I Emplr
PR Batch 409 J I 2007 Post Health I Emplr
PR Batch 409 II 2007 Ret Health 5
PR Batch 409 II 2007 Post Health I Emplr
PR Batch 409 II 2007 Ret Health 3
PR Batch 409 II 2007 Ret Health 3
PR Batch 409 11 2007 Post Health 2 Emplr
PR Batch 409 I I 2007 Post Health I Emplr
PR Batch 409 I I 2007 Ret Health 5
PR Batch 409 I I 2007 Ret Health 5
PR Batch 499 I I 2007 Ret Health 1
PR Batch 409 J I 2007 Post Health 5 Emplr
PR Batch 409 I I 2007 Post Health 05 Emplr
PR Batch 409 II 2007 Post Health 2 Emplr
PR Batch 409 II 2007 Post Health 3 Emplr
PR Batch 409 II 2007 Ret Health 5
PR Batch 409 II 2007 Ret Health 1
PR Batch 409 II 2007 Ret Health 1
PR Batch 409 II 2007 Post Health 7 Emplr
PR Batch 409 II 2007 Post Health 2 Emplr
PR Batch 409 II 2007 Ret Health 1
PR Batch 409 II 2007 Post Health I Emplr
PR Batch 409 II 2007 Ret Health 2
PR Batch 409 I I 2007 Ret Health 1
PR Batch 409 I I 2007 Ret Health 5
PR Batch 409 II 2007 Rct Health 5
PR Batch 409 II 2007 Ret Health 2
PR Batch 409 11 2007 Ret Health 3
Line Item Account
210 0000 2016
701 0000 2016
700 0000 2016
700 0000 2016
701 0000 20 I 6
101 0000 20 I 6
720 0000 20 I 6
210 0000 2016
720 0000 20 6
210 0000 2016
701 0000 2016
700 0000 20 16
701 0000 2016
701 0000 2016
700 0000 20 I 6
700 0000 20 I 6
70 I 0000 20 16
101 0000 20 I 6
10 I 0000 20 16
101 0000 2016
700 0000 2016
101 0000 2016
720 0000 2016
210 0000 2016
720 0000 2016
101 0000 2016
101 0000 2016
701 0000 2016
101 0000 20 I 6
701 0000 2016
700 0000 20 I 6
101 0000 20 I 6
101 0000 2016
700 0000 2016
101 0000 2016
0 21
0 27
0 28
0 53
0 53
0 82
138
IA6
1 92
2 77
2 79
3i3
3 64
437
4 95
6 89
6 91
0 77
11 I 3
IIAI
12 74
1745
17 99
19 12
25 29
27 15
3248
35 86
40 90
57 01
64 96
14545
156 77
66 52
228G3
Page 26
357
CITY OF CHANHAS
User danielle
11101ii7
11 0607
11 01i 07
1110707
In Total
n 13475 Total
lSRS
ISRS
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 11 42
PR Batch 409 II 2007 Ret Health 7
PR Batch 409 2007 Ret Health 2
PR Batch 409 I 2007 Ret Health 1
PR Batch 498 2007600 HR PA YOUT
101 0000 2016
101 0000 2016
101 0000 2016
101 0000 2016
Amonnt
354 90
424 72
556 79
14 513 86
16 974 65
16 974 65
lSRS 16 974 65
16 974 65
ahan Shel ey
nahashel l ah 1I1 Shel e
n 13475S 11 08 07
In 10202007
Line Item Date Line Item Description
10 20 07 babysitting training
In 10202007 Total
I ATIOIWJIE RETIRElENT SOLUTIOI
ATRET NATIONWIDE RETIREMENT SOLUTION
n 134759 11 08 07
In
Line telll Date
1110607
I I 10 O7
I I IOGlO 7
1110607
In Total
Ck 134758 Total
nahashef
ahan Shelley
n 134759 Total
ATRET
Line Item Account
101 1731 4300 125 00
125 00
125 00
Nahan Shel e 125 00
125 00
Line Itelll Description
PR Batch 409 11 2007 Nationwide Retirement
PR Batch 409 11 2007 Nationwide Retirement
PR Batch 409 II 2007 Nationwide Retirement
PR Batch 409 II 2007 Nationwide Retirement
Line Item Account
720 0000 2009
701 0000 2009
700 0000 2009
101 0000 2009
50 00
324 25
393 55
4 609 29
5 377 09
5 377 09
NATIONWIDE RETIREMENT SOLUTION 5 377 09
ATIOiWJIE RETIREIENTSOLUTION 5 377 09
ilEXTEL
nextel NEXTEL
Ck 134761 11 08 07
n 10222007
Line tel11 Date
10 22 07
I 022 7
10 22 07
10 2207
I J 22 07
10 2207
10 22 07
10 22107
10 22 07
10 227
10 22 07
Line Item Description
cell phone charges
cell phone charges
cell phone charges
cell phone charges
cell phone charges
cell phone charges
cell phone charges
cell phone charges
cell phone charges
cell phone charges
cell phone charges
Line Item Account
101 1170 4310
101 1530 4310
720 0000 4310
101 1260 4310
101 1130 4310
101 1160 4310
701 0000 4310
101 1310 4310
101 1520 4310
101 1370 4310
10 1600 43 I 0
20 17
20 33
20 33
20 33
2342
48 81
92 51
115 15
126 22
175 73
218 17
Page 27
358
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 II 42
10 22 07 cell phone chargcs
10 22107 cell phone charges
10 22107 cell phone charges
10 22107 cell phone charges
10 22107 cell phone charges
10 22107 cell phone charges
Inv 10222007 Total
700 0000 4310
101 1120 43 10
101 1220 4310
101 1250 4310
101 1550 4310
101 1320 4310
Amount
218 74
223 17
277 43
304 91
371 71
469 74
2 746 87
Ck 134701 Total 2 746 87
nntrl EXTEL 2 746 87
EXTEL 2 746 87
O REILLY AUTOl 10TIVE INC
orraul O REILI1 AliTOl 10TIVE INC
Ck 1347 4 11108 07
1m 10282007
Line Itclll Date Line Itclll Description
10 28107 auto parts
10 28 07 auto parts
I 028107 auto parts
I 0 28 07 auto parts
I W28 07 auto parts
10 28107 auto parts
1028107 auto parts
10 28 07 auto parts
In 10282007 Total
Linc Itelll Account
101 1320 4120
701 0000 4140
101 1320 4150
101 1370 4150
101 1220 4140
101 1250 4140
700 0000 4140
101 1320 4140
3148
4 10
6 23
11 52
37 51
85 60
148 18
189 34
45 I06
Ck 134764 Total 451 06
orcaut O REILLY AUTOMOTIVE INC 451 06
O REILLY AUTOIOTIVE I1iC 451 06
OEIII IE PAliL
ochmpaul OEIII1E PAUL
Ck 1347 2 11 08 07
In 11022007
Lme Itelll Date Line Item Description
1102 07 mileage reimburscmcnt
In 11022007 Total
Line ItCIll Account
101 1310 4370 5 82
5 82
Ck 134762 Total 5 82
ochmpaul OEHME PAUL 5 82
OEIIIE PAUL 5 82
Olympic Pools
olHJOO Olympic Pools
Ck 134763 11 08 07
In 930LakeSusanHil
Line Item Date Linc Itcm Description
11 07107 Erosion Escrow 930 Lake Susan Hills Dr
In 930LakeSusanHil Total
Line Item Account
815 8202 2024 500 00
500 00
Ck 134763 Total 500 00
Pagc 28
359
CITY or CHA HAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 11 42
olypoo Olympic Pools
Amollnt
500 00
Ol lllpic Pools 500 00
1 TRICK CO
patco PATRICK CO
n 134831 11 15107
Inv 7480i0
Line Item Date
11 0707
Inv 748060 Total
Line Item Description
license tags
Line Item Account
101 1170 4110 139 19
139 19
n 134831 Total 139 19
patco PATRICK CO 139 19
PATRICK CO 139 19
Positivc Con ncctions
pOSCOII Positin Conllcctiolls
Ck 134765 1108 07
1m 620i223in
Line Item Date Line Item Description
10 19107 Bus Service for Fire Prevention Week
Inv 6206223in Total
Line Item Account
101 1220 4375 142 20
142 20
n 134765 Total 142 20
pOSCOII Positive Conllcctions 142 20
PositiH Conncctions 142 20
POWER SYSTDIS
POWCII POWER SYSTEMS
Ck 134766 11 08107
In 1033270
Line Item Date Line Item Description
10 1707 aer adaptors
Inv 1033270 Total
Line Item Account
701 0000 4 20 8 50
8 50
Ck 134766 Total 8 50
Ck 134832 11115 07
In 1045330
Line Item Date Line Item Description
11 02107 AER Hose
Inv 1045330 Total
Line Item Account
701 0000 4120 9202
92 02
n 134832 Total 92 02
POWClIA POWER SYSTEMS 100 52
POWER SYSTEI IS 100 52
Page 29
360
PIWFESSIOALTURF RENOVATION
protur PROFESSIONAL TURF RENOVATION
Ck 134767 11 08 07
In 087914
Line Item Date
10 2207
In 087914 Total
CITY OF CHANHAS
User danielle
Ck 134767 Total
protur
Accounts Payable
Check Detail Report Detail
Printed 11116 07 11 42
Amount
Line Item Description
fertilizer
Line Item Account
101 1550 4120 3 220 56
3 220 56
3 22056
PROFESSIOALTURF RENOVATION 3 220 56
PHOFESSIONAL TURF RENOVATIO 3 220 56
Quality Control Integration
flualcon Qualit Control Integration
Ck 134798 11 08m7
Inv 104
Line Item Date
10117 07
111 104 Total
Ck 134798 Total
Ck 134833
In 0
Line Item Date
10 25 07
In 110 Total
Inv 1 8
Line Item lle
10 3 107
In 118 Total
Ck 134833 Total
flualcon
Line Item Description
lift station I 0 repair
Line Item Account
701 0000 4553 3 727 50
3 727 50
3 727 50
11 15 07
Line Item Description
repair to Ii ft station II I 0
Line Item Account
701 0000 4553 1486 74
1486 74
Line Item Description
Lift Station 327 repair due to lightning
Line Item Account
701 0000 4553 1 246 80
1 246 80
2 733 54
Quality Control Integration 6 46 I 04
Quality Control Integration 6 46 1 04
QUILL CORPORATION
fluill QUILL CORPORATION
Ck 134834 11 15107
In 11022007
Line Item Date
11 02107
11102107
In 1 022007
Ck 134834 Total
fluill
QUILL CORPOHATION
Line Item Description
office supplies telephone cleaning wipe
Office supplies paper ruled pads
Total
Line Item Account
10 1170 4110
101 1170 4110
16 68
222 28
238 96
238 96
QUILL CORPORATION 238 96
238 96
Page 30
361
CITY OF CHANHAS
User danielle
QWEST
qwest QWEST
n 134835 1111507
In 11012007
Line Item Date Line Item Dcseription
11 01 07 telephonc ehargcs
1110 1 07 telephonc ehargcs
In 11012007 Total
n 134835 Total
qwest QVEST
QVEST
R R MARINE
rrmar R R IARIE
n 134774 1108 07
Im 219587
Linc Itclll Datc Linc Itcm Dcseription
10 24 07 fucl filtcr
In 2195807 Total
n 134774 Total
rrma r R R MARINE
R R I IARIiE
RUM SERVICES INC
rbmser RBI I SERVICES INC
Ck 134769 11 08 07
In 12585
Linc Itcm Datc
10 31 07
In 12585 Total
Linc Itcm Dcscription
nightly janitorial City Hall
In 12586
Line Itcm Datc
10 3107
In J 258 Total
Linc Itcm Dcscription
nightly janitorial s cs Library
n 134769 Total
rh I1lser RUM SERVICES INC
RBM SERVICES INC
RlIiahle Ortice Supplies
rclofT Reliable Office Supplies
Ck 134770 11 08107
In fv357700
Linc ItCIll Datc Linc Itcm Dcscription
1101107 copy papcr
In f357700 Total
Ck 134770 Total
Accounts Payable
Chcck Dctail Report Detail
Printed 11 16 07 11 42
Amount
Line Item Account
700 0000 4310
70 J 0000 43 1 0
34 21
34 21
6842
68 42
6842
68 42
Line Itcm Account
10 1 I 220 4140 13 69
13 69
13 69
13 69
13 69
Line Item Account
101 1170 4350 2 452 29
2 452 29
Line Item Account
101 1190 4350 2 337 68
2337 68
4 789 97
4 789 97
4 789 97
Line Item Account
10 1 I 170 4110 84 87
84 87
84 87
Page 3
362
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed I II 6 07 11 42
reloff Reliable Office Supplies
Amount
84 87
Reliable Office Supplies 84 87
RIDGEDALE nlCA
rilymc RIDGEDALE YICA
n 134771 1I 08m7
In 10262007
Line Item Date Line Itelll Description
10 2607 Preschool soccer
In 10262007 Total
Line Item Account
101 710 4300 4 108 00
4 108 00
n 134771 Total 4 108 00
ril l11c RIDGEDALE YMCA 4 108 00
R GEDALE YiICA 4 108 00
R GEVIEW i IEDlCAL CENTER
ridmel R GEVIEW MEDICAL CENTER
n 134836 11 1507
In 10232007
Line Item Date
1108 07
1m 10232007
Line Itelll Description
Occupational Health Consultation
Total
Line Itelll Account
10 1220 4300 433 50
433 50
n 134836 Total 433 50
ridmed RIDGEVIEW IIEDICAL CENTER 433 50
R GEVIEW IIEDICAL CENTER 433 50
Hirse Family Properties LLC
RIESFRED Rirse Famil Properties LLC
n 34772 11 08 07
In 43
Line Itelll Date
1004 07
In 43 Total
Line Item Description
lawn s c parking lot elect water utili
Line Item Account
101 1550 4300 358 31
358 31
In 44
Line Itelll Date
1 104 07
In 44 Total
Line Item Description
lawn s e parking lot elect utility chg
Line Item Account
10 1550 4300 716 62
716 62
Ck 134772 Total 1 074 93
RIESFRED Riese Family Properties LLC 1 074 93
I iese Family Properties LLC 1 074 93
ROYAL PRINT GROUP INC
roypri ROYAL PRINT GROUP INC
Ck 34773 11 08 07
In 12 55
Line Itelll Date
11 027
Line Item Description
letterhead
Line Item Account
10 I II 70 411 0 378 08
Page 32
363
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11116 07 11 42
In 12655 Total
Amount
378 08
Ck J 34773 Total 378 08
roypri ROYAL PRINT GROUP INC 378 08
ROYAL PRINT GROUP INC 378 08
Ryan Homes Inc
ryahom Ryan Homes Inc
n 134775 I Ji08 07
Inv 8757Stonend In
Line Itcm D ltc Line Item DescriPtion
1107 07 Erosion Escrow 8757 Stonefield Lane
Inv 8757Stonend In Total
Line Item Account
815 8202 2024 1 000 00
1 000 00
n 134775 Total J 000 00
ryahom Ryan Homes Inc 1 000 00
R an Homes Inc 1 000 00
Sanchez Jazmine
SANC AZM Sanchez Jazmine
n 134837 11115107
Inv 10312007
Line Itcm D lte
1031107
In 10312007
Line Item Description
return of pkg reimburse
Total
Line Item Account
101 1260 4240 8 36
8 36
Ck J 34837 Total 8 36
SANCJAZi1 Sanchez Jazmine 8 36
Sanchez Jazmine 8 36
Sanders Vanessa
salHh ane Sanders Vanessa
n 134776 11 08i07
Inv 11072007
Line Item Date
1107107
1m 11072007
Line Item Description
refund of dance costume
Total
Line Item Account
101 1535 363 45 00
45 00
n 13477i Total 45 00
s3ndvane Sanders Vanessa 45 00
Sanders Vanessa 45 00
SA VOlE SlJPPLY CO INC
SAVSlJP SAVOIE SUPPLY CO INC
n 134838 1111507
1m s2283i2900 I
Line Ilem Date
1106 07
In s2283i2900 I
Line Item Description
savoie primary solutions speed stripper
Total
Line Item Account
0 1370 4150 85 05
85 05
Page 33
364
CITY OF CHANHAS
L ser danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 1142
Ck 134838 Total
Amount
85 05
SA VSUP SAVOIE SUPPLY CO INC 85 05
SA VOlE SUPPLY CO INC 85 05
SCHlIEG DL N
SCHIDL N SCHl lIEG DEAN
Ck 134777 11 08m7
Iny 11022007
Line Item Date
1102 07
I ny 11022007
Line Item Description
Ch mhassen Public Works Cleaning
Total
Line Item Account
101 1370 4350 1 522 80
1 522 80
Ck 134777 Total 1 522 80
SClli lDEAN SCHllIEG DEAN 1 522 80
SCHl lIEG DEAN 1 522 80
SHOHEWOOD TRUE VALUE
sholru SHOREWOOD TRUE VALUE
Ck 13477S 1108 07
Iny IOI22007
Linc Item Date Line Item Description
I O 3 07 dbl faced tape
Inv 10122007 Total
Line Item Account
101 11 70 4110 4 24
4 24
I nv 0202007
Line Item Date Line Item Description
10 3107 enamel bulk hillman hardware
lnv 10202007 Total
Line Item Account
101 1190 45 10 9 64
9 64
Ck 134778 Total 13 88
shotru SHOREWOOD TRUE VALUE 13 88
SHOREWOOD TRUE VALUE 13 88
SOUTHWEST SUBURBAN PUBLISHING
SOUSUB SOUTHWEST SUBURBAN PUBLISHING
Ck 134839 11115 07
Inv 103 J 2007
Line Item Date Line Item Description
10 3107 printing publishing
1031 07 printing publishing
10 3107 printing publishing
10 3 1 07 printing publishing
0 3 1107 printing publishing
I J 31 107 printing publishing
10131 07 printing publishing
I J 31 107 printing publishing
I O 3 07 printing publishing
lnv 10312007 Total
Line Item Account
101 1260 4340
101 1421 4300
101 1510 4340
101 1310 4340
101 1410 4340
701 0000 4340
101 1110 4340
700 0000 4340
720 7201 4340
18 18
50 90
136 80
16448
203 89
207 19
435 20
480 80
615 60
2 313 04
Ck 134839 Total 2 313 04
SOUSllB SOUTHWEST SUBURBAN PUBLISHING 2 3 I 3 04
Page 34
365
CITY OF CHNIlAS
Uscr danicllc
SOUTHWEST SUBURBAN PUBLISHING
SW WC Service Cooperatives
SWWC SW WC Service Cooperatives
n 134770 1108 07
In 11072007
Linc Itcl11 Datc Line Itcm Dcscription
11107107 Hcalth Insurance December
1107 07 Health Insurance December
1107 07 Hcalth Insurance December
11 07 07 Hcalth Insurance December
11 0707 Health Insurance December
11 07107 Health Insurance December
In 11072007 Total
n 134770 Total
S WC SW WC Sen ice Cooperatives
SW WC Serice Cooperaties
T F Striker
TFSTRII E T F Striker
n 134840 11115107
In 13467
Line Itel11 Date
00 4107
Inv 13467 Total
Line Itcm Description
paint walls door corridor
n 134840 Total
TFSTRII E T F Striker
T F Striker
TECIINAGIL PIIICS
tl cgra TECIIAGRAPIIICS
Ck 1347S0 1108107
In 5783011
Line IICI11 Date
10 31107
In 57830 II
Line Item Description
business card names
Total
Iny 582701 1
Line Itcm Datc Line Item Description
10 31 07 dog cat registration
In 5827011 Total
n 134780 Total
tecgra TECHNAGRAPIIICS
TECIIGR PIIICS
Accounts Payable
Check Detail Report Detail
Printed 11 II 607 II 4
Amount
2 313 04
Line Item Account
210 0000 2012
101 0000 2012
701 0000 2012
700 0000 2012
720 0000 2012
101 0000 2012
568 25
807 50
2 37130
3 592 80
5 255 88
35 045 27
47 641 00
47 641 00
47 641 00
47 641 00
Line Item Account
101 1170 4510 600 00
600 00
600 00
600 00
600 00
Line Item Account
101 1170 4110 178 92
178 92
Line Item Account
101 170 4110 146 87
146 87
325 79
325 79
325 79
Page 35
366
CITY OF CHA HAS
User danielle
Thomas Kim
thomkim Thomas Kim
Ck 134781 1108 07
In 2000803002
Line Item Date
10 30 07
In 20008030D2
Ck 134781 Total
thomldm
Thomas Kim
Linc Itcm Dcscription
Rcfund Dance Kinder I
Total
Thomas I im
TWIN CITY WATER CLINIC INC
TWIClT TWI1CITY WATER CLINIC I1C
Ck 134782 11 08 D7
hW 4259
Linc tcm Datc
I i2907
In 4259 Total
Ck J 34782 Total
TWICIT
Linc Itcm DescriPtion
analysis of coliform water samples
Accounts Payable
Check Dctail Report Dctail
Printed 11 16 07 1142
Amollnt
Line Item Account
101 1534 3631 39 00
39 00
39 00
39 00
39 00
Line Itcm Account
700 0000 4300 65 00
65 00
65 00
TWIN CITY VATER CLINIC INC
TWIN CITY WATER CLINIC INC
65 00
U ITED Wo Y
UNIWAY UNITED WAY
Ck 134785 1108 07
In
Lmc Itclll Datc
1106 07
In Total
Ck 134785 Total
UNIWAY
UNITED VA Y
Linc Item Dcscription
PR Batch 409 II 2007 United Way
UNITED WAY
UNIVERSITY OF l lIIESOTA
UNIII1 U IVERSITY OF MINNESOTA
Ck 134842 1111507
1m 11142007
Linc Itcm Datc
IIJ4 07
In 1I1420D7
Ck 134842 Total
UNIIIN
Line Itcm Dcscrintion
r1 Liftin Rcgistration 52nd Annual Bldg
Total
65 00
Line Item Account
10 0000 2006 42 00
42 00
42 00
42 00
42 00
Line Item Account
101 1220 4370 170 DO
170 00
170 00
UNIVERSITY OF IINNESOTA
UNIVERSITY OF MINNESOTA
170 00
170 00
Page 36
367
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 11 42
Amount
USA BLUE 13001
usahlu USA BLUE BOOI
n 134843 11 1507
In 480542
Line Itelll Date
1102 07
Inv 480542 Tot ll
Line Item DescriPtion
brass hydrant adaptor
Line Item Account
700 7019 4260 4048
40 48
Ck 134843 Total 4048
uSOlhlu USA BLUE BOOI 40 48
l SA BLUE BOOI 40 48
ALLEY RICH CO INC
LHIC VALLEY RICH CO INC
n 134844 11 1507
In 10172007
Line Itelll Date Line Item Description
to I7107 R07582 11101 6301 Trapline Circle
In 10172007 Total
Line Item Account
700 0000 4552 3 525 00
3 525 00
In 10232007
Line Item Date Line Item Description
10 2Jl07 R07600 10 31 Marsh Dr Hidden Lane
Inv 10232007 Total
Line Item Account
700 0000 4552 3 963 26
3 963 26
n 134844 Total 7488 26
VALRIC VALLEY RICH CO INC 7 488 26
VALLEY RICH CO INC 7 488 26
VERIZOWIRELESS
VERIZO VERIZON WIRELESS
Ck 13478 11 08 07
Inv 10 I 82007
Line Itelll Date Line Item Description
10 18 07 cell phone charges
Inv 10182007 Total
Line Item Account
101 1220 4310 150
150
Inv 11072007
Line Item Date Line Item Description
IIi07107 cell phone service
In 11072007 Total
Line Item Account
101 1220 43 I 0 7 57
7 57
Inv 1772576591
Line Item Date
10 18 07
Inv I772576591
Line Item DescriPtion
Cell phone charges
Total
Line Item Account
101 1220 43 10 1 83
1 83
Ck I 3478 Total 10 90
Ck 134845 1115107
In IOJI2007
Line Itelll Date Line Item Description
10 31107 ireless services
In 10312007 Total
Line Item Account
101 1220 4310 27 93
2793
Page 37
368
CITY OF CHANIlAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 11 16 07 11 42
n 134845 Total
Amollnt
27 93
VERIZO VERIZON WIRELESS 38 83
VEIUZON WIRELESS 38 83
VERIEER OF i IINNESOTA
VERilIN VERi lEER OF MINNESOTA
n 134787 11 08107
In PI 43
Linc IteIll Jatc
10 25107
lnv PI 43 Total
Line ItCIll Description
dust cap for chipper
Line Item Account
101 1320 4120 9 33
9 33
n 134787 Total 9 33
VEID11N VERMEER OF lINNESOTA 9 33
VEIB1EER OF lIiNESOTA 9 33
WASTE L NAGEJ1ENT SA VAGE
I tsmln WASTE i lAiAGEl IENT SA V AGE
n 134788 11 08107
In 11012007
Line IteIll D lte Line Item Description
11 0 I 07 garbage scrice
II I 07 garbage service
11 0 I 07 garbage service
110 I 07 garbage service
I I O I 07 garbage service
Inv 11012007 Total
Line Item Account
101 1220 4350
10 1 1190 4350
101 1370 4350
01 1170 4350
101 1220 4350
16 13
136 07
148 99
174 91
20047
676 57
n 134788 Total 676 57
1 lsmln WASTE MANAGEMENT SAVAGE 676 57
WASTE IANAGEl1ENT SA VAGE 676 57
WENCK ASSOCIATES INC
1 enc WENCK ASSOCIATES INC
Ck 134846 11115 07
Inv 703710
Linc Itcm Date
10 31O7
Inv 703710 Total
Line Item JescriPtion
professional services
Line Item Account
720 0000 4300 1 598 40
1 59840
n 13484 1 Total 1 59840
l nc WENCK ASSOCIATES INC 1 59840
WEiCK ASSOCIATES INC 1 59840
l rnl r Fole Jlldy
Vern llldy Werner Foley Indy
n 134734 II OSI07
In 2000802002
Line Item Date
10 307
Line Item Description
Dance Combo 3
Line Item Account
101 1534 3631 80 00
Page 38
369
CITY OF CHANIIAS
Uscr danicllc
Accounts Payablc
Check Dctail Report Detail
Printed 11 16 07 11 42
In 2000802002 Total
Amount
80 00
Ck 114734 Total 80 00
WernJudy Werner Foley Judy 80 00
Werner Foley ludy 80 00
WILSON S NURSERY INC
wiluur WILSOSNURSERY INC
Ck 14789 11 08 07
1m 034213
Linc Itcm Datc
1105 07
111 034213 Total
Line Itcm Description
trecs
Line Item Account
410 0000 470 I 8 850 00
8 850 00
Ck 14789 Total 8 850 00
Hullr WILSON S NURSERY INC 8 850 00
WILSON S NURSERY INC 8 850 00
WSf ASSOCIATES INC
sh WSf ASSOCIATES INC
Ck 134790 11 0807
In 9
Linc Itcm Datc
10 24O7
1111 9 Total
Line Itcm Description
lift station 3 modification
Line Itcm Account
701 7015 4752 3424 25
3 424 25
Ck 134790 Tot 11 3424 25
wsh WSf ASSOCIATES INC 3 424 25
WSB 8 ASSOCI TES IJC 3 424 25
WW GRAINGER INC
WWGRA WW GRAINGER INC
Ck 114791 11108107
Inv 806488110
Linc Itcm Datc Linc Itcm Dcscription
1025107 photocontrol thrcadcd
1m 801i488 II 0 Total
Line Itcm Account
700 7019 4550 14 14
14 14
In 9486843536
Linc Itcm Datc
10 2507
Inv 9486843536
Linc Itclll Dcscription
dig multimctcr tcst Icad set carry cas
Total
Line Itcm Account
700 7019 4260 291 03
291Q3
Ck 134791 Total 305 17
n 114847 1115107
I nv 9405M7 30
Linc Itcm Datc Linc Itcm Dcscription
IO 30t07 oilcr thrcading thread cutting
In 9490564730 Total
Line Itclll Account
101 1370 4260 281 04
281 04
Page 39
370
CITY OF CH A1 II AS
User danielle
Ck 134847 Total
WWGRA
WW GRAINGER INC
W GRAINGER INC
XCEL ENERGY IlC
Hel XCEL ElERGY IlC
Ck 134792 II OSI07
In 10232007
Line Item Date
10 2307
In 10232007
111 11012007
Line Item Date
1101107
1m 11012007
Ck 134792 Total
Line Item Description
electricity charges
Total
Line Item Description
electricity charges
Total
Ck 134848 11 15l7
1m 09302007
Line Itcm Datc Line Itcm Dcscription
09 30107 Elcctricity Charges
In 09302007 Total
In 11052007
Line Item Date
11105 07
In 11052007
Linc Itcm Dcscription
electricity chargcs
Total
In IIOfi2007
Linc Itcm Datc Linc Itcm Dcscription
IllOfi 07 clcctricity chargcs
In IIOfi2007 Total
In 11072007
Line Item Datc
II i07 07
1110707
111 11072007
Ck 134848 Total
Hel
XCEL ElERGY INC
Linc Itcm Description
elcctricity chargcs
clectricity chargcs
Total
XCEL ENERGY INC
ZACK S I C
ZACKS ZACK S INC
Ck 134793 II OSI07
111 23454
Linc Itcm D ltc
10 19 07
10 19 07
I 011 9i07
I Ol9107
10 19107
Line Item Dcscription
towcls bungc cords
to cls bungc cords
towcls bUllgc cords
towcls bungc cords
towels bungc cords
Accounts Payable
Check Dctail Report Detail
Printed 11116 07 11 42
Amount
2SI 04
586 21
586 21
Line Item Account
101 1350 4320 19 237 14
19 237 14
Line Item Account
700 7019 4320 1 S 979 4 I
18 97941
3S 216 55
Line Item Account
700 7019 4320 27 805 07
27 S05 07
Line Itcm Account
700 0000 4320 90 50
9050
Line Item Account
701 0000 4320 24 24
24 24
Line Item Account
101 1350 4320
101 1550 4320
23 43
17S 23
2 0 Ijj
28 122 07
66 338 62
66 338 62
Line Item AccoLlnt
700 0000 4150
701 0000 4150
101 1320 4150
101 1370 4 50
101 1550 4150
157 88
157 88
157 S8
157 S9
157 89
Page 40
371
CITY OF CHANIIAS
L scr cbniellc
In 2345 Total
Ck 134793 Total
ZACI S
Z CK S 1Ie ZACK S INe
ZIEGLER IJC
ZIEGLE ZIEGLER INC
n 134794 11 08 07
In j8n8 101
I inc Itel11 Date Line Item Description
07 3 Ii07 asphalt rollers compactors
Im j8778101 Total
In pcOO I 028 I 88
Line Itcm D ltc
1011207
In pcOOl028188
In s 050104074
Line Itelll Datc
09 207
In s 05010 074
In s 050 I 05232
Line Itcm Datc
1011 0 07
In s 050 I 05232
Ck 134794 Total
ZIEGLE
ZIEGLER INC
Line Item Description
indicator union parts
Total
Line Itcm Description
rcpair charging systelll
Total
Line Itelll Description
repair charging system lift station
Total
ZIEGLER INC
ZOERIIOF PEGGIE
ZOERPEGG ZOERIIOF PEGGIE
n 134849 11115 07
In OOicrc
Line I telll Date
1108 07
In OOicrc Total
Ck 134849 Total
ZOERPEGG
ZOERIIOF PEGGIE
Total
Line Itelll Description
Pilates
ZOERIIOF PEGGIE
Accounts Payable
Check Dctail Report Dctail
Line Item Account
0 1320 4120
Line Item Account
700 0000 4120
Line Item Account
701 0000 4551
Line Item Account
701 0000 4551
Line Item Account
101 1761 4300
Printed 11 16 07 11 42
Amount
78942
789 42
789 42
78942
779 58
779 58
51 93
51 93
37538
375 38
1 993 27
1 993 27
1 641 00
1 641 00
1 641 00
933 10
933 10
933 0
933 10
933 10
1 138 098 23
Page 4 I
372