CC Packet 2007 10 22AGENDA
CHANHASSEN CITY COUNCIL
MONDAY, OCTOBER 22, 2007
CHANHASSEN MUNICIPAL BUILDING, 7700 MARKET BOULEVARD
5:30 P.M. - CITY COUNCIL WORK SESSION, FOUNTAIN CONFERENCE ROOM
Note: If the City Council does not complete the work session items in the time allotted, the
remaining items will be considered after the regular agenda.
A. Code Amendments: Chapters 1 and 20-904 Regarding “Freedom to Breathe Act.”
B. 2008 Budget Presentations:
- Community Development
- Public Works/Engineering Department
- Park & Recreation Department
C. Well Nos. 12 & 13, Project Nos. 08-04 & 08-05: Discuss Proposed Locations
7:00 P.M. – REGULAR MEETING, CITY COUNCIL CHAMBERS
CALL TO ORDER (Pledge of Allegiance)
PUBLIC ANNOUNCEMENTS
D. Notification of Meeting Change Due to Veterans Day.
E. Invitation to Halloween Party.
CONSENT AGENDA
All items listed under the Consent Agenda are considered to be routine by the city council and
will be considered as one motion. There will be no separate discussion of these items. If
discussion is desired, that item will be removed from the Consent Agenda and considered
separately. City council action is based on the staff recommendation for each item. Refer to the
council packet for each staff report.
1. a. Approval of Minutes:
- City Council Work Session Minutes dated September 24, 2007
- City Council Summary Minutes dated September 24, 2007
- City Council Verbatim Minutes dated September 24, 2007
Receive Commission Minutes:
- Planning Commission Summary Minutes dated October 2, 2007
- Planning Commission Verbatim Minutes dated October 2, 2007
- Park and Recreation Commission Summary Minutes dated September 25, 2007
1
- Park and Recreation Commission Verbatim Minutes dated September 25, 2007
b. TH 312 Project 03-09: Approve Signal Agreement Nos. 87715M (Powers &
Lyman Boulevards); 87678M (TH 212 at Powers Boulevard, North and South
Ramps); 87679M (TH 101 at Lyman Blvd.).
c. Lotus Woods Project:
1) Final Plat Approval with Variances.
2) Lotus Woods Project: Approval of Plans & Specifications and
Development Contract.
d. Satellite Fire Station, Project 03-09-13: Approve Expenditure of Funds.
e. Future Well Improvements, Project Nos. 08-04 & 08-05: Approve Consultant
Contract.
f. Accept Donation from Community Bank Chanhassen for the Senior Center
Holiday Party.
g. Approve Certification of Delinquent Utility Accounts.
h. Approve Certification of Water & Sewer Hook-up Charges to Hennepin County,
Dell Road Medical Building.
i. Lake Riley Woods, SWMP12-035A: Approve Quote for Rain Gardens.
j. Accept Donation from KleinBank Chanhassen for Senior Center 2008 Lifelong
Learning Program.
k. Approval of Elected Official’s Travel.
l. TH 212, Project No. 03-09: Approve Resolution Supporting Improvements Bill
m. Certification of Delinquent Code Enforcement Accounts.
VISITOR PRESENTATIONS
LAW ENFORCEMENT/FIRE DEPARTMENT UPDATE
2. a. Sgt. Peter Anderley, Carver County Sheriff's Department
b. Chief Gregg Geske, Chanhassen Fire Department
PUBLIC HEARINGS
3. Vacation File 07-05: Consider Vacation of Drainage & Utility Easements.
2
UNFINISHED BUSINESS - None
NEW BUSINESS
4. SCHERLE VARIANCE: Appeal Decision of Denial from the Planning Commission,
Request for an After-the-Fact Variance to a Side Yard Setback to Construct a Garage
Addition, 8541 Flamingo Drive, Applicant: David & Julie Scherle.
5. Discussion of Kurvers Point Speed Limit.
COUNCIL PRESENTATIONS
ADMINISTRATIVE PRESENTATIONS
CORRESPONDENCE PACKET
ADJOURNMENT
A copy of the staff report and supporting documentation being sent to the city council will be
available after 2:00 p.m. on Thursday. Please contact city hall at 952-227-1100 to verify that
your item has not been deleted from the agenda any time after 2:00 p.m. on Thursday.
GUIDELINES FOR VISITOR PRESENTATIONS
Welcome to the Chanhassen City Council Meeting. In the interest of open communications, the Chanhassen City
Council wishes to provide an opportunity for the public to address the City Council. That opportunity is provided at
every regular City Council meeting during Visitor Presentations.
1. Anyone indicating a desire to speak during Visitor Presentations will be acknowledged by the Mayor.
When called upon to speak, state your name, address, and topic. All remarks shall be addressed to the City
Council as a whole, not to any specific member(s) or to any person who is not a member of the City
Council.
2. If there are a number of individuals present to speak on the same topic, please designate a spokesperson
that can summarize the issue.
3. Limit your comments to five minutes. Additional time may be granted at the discretion of the Mayor. If
you have written comments, provide a copy to the Council.
4. During Visitor Presentations, the Council and staff listen to comments and will not engage in discussion.
Council members or the City Manager may ask questions of you in order to gain a thorough understanding
of your concern, suggestion or request.
5. Please be aware that disrespectful comments or comments of a personal nature, directed at an individual
either by name or inference, will not be allowed. Personnel concerns should be directed to the City
Manager.
3
Members of the City Council and some staff members may gather at Houlihan’s Restaurant & Bar, 530 Pond Promenade in Chanhassen
immediately after the meeting for a purely social event. All members of the public are welcome.
4
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952227 1170
Finance
Phone 952227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
A
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Angie Auseth Planner I rt AVOctober222007DATE
SUBJ Smoking Shelter Ordinance
BACKGROUND
The Freedom to Breathe Provision was passed by Legislature on May 12 2007
signed into law on May 16 2007 and became effective Statewide on October 1
2007 The purpose of the Freedom to Breathe Provision is to protect employees
and the general public from the hazards of secondhand smoke by prohibiting
smoking in public places places of employment public transportation and at
public meetings
DISCUSSION
The Freedom to Breathe Provision prohibits smoking in all indoor public places
and at public meetings in all indoor places of employment work including
lunchrooms lounges and offices in all bars and indoor private social clubs and
on all public transportation
It is important to note that smoking on open patios is NOT prohibited The
provision only addresses prohibits indoor spaces Attached is a section from the
Minnesota Department of Health addressing Frequently Asked Questions of the
Freedom to Breathe Provision for your reference
As a result of the Freedom to Breathe Provision local establishments that want to
create outdoor smoking shelters to accommodate their patrons have contacted the
City regarding our standards Rather than respond on an ad hoc basis staff
believes it is necessary to set standards for the construction of outdoor smoking
shelters
Staff s goal when drafting this ordinance was to create standards that
1 Have minimal restrictions other than State requirements
2 Is easy to understand and implement
3 Is easy to enforce
Staff researched other counties and cities regarding standards for smoking
shelters Most ordinances address the distance smoking must be from the main
entrance of a building This ranges from 5 feet in Meeker County to 25 feet in
The City of Chanhassen A growing community with clean lakes quality schools a channing downtown thriving businesses winding trails and beautiful parks A great place to live work and play5
Todd Gerhardt
Smoking Shelter Ordinance
October 22 2007
Page 2
Beltrami County However staff found that only the City of Bloomington addressed standards for a
permanent smoking shelter Staff proposes that some ofthe standards in Bloomington be used to
create standards that would be applicable in Chanhassen Staff has developed the following
recommendation based on the research of neighboring cities as well as the guidelines set forth by the
State
Staff sent the original draft to Applebee s Axel s Restaurant Buffalo Wild Wings Chanhassen
Legion Houlihan s Rey Azteca and Sr Poncho s on September 26 2007 The intent of the
notification was to gather input from some of the business that this ordinance would affect To date
the main concern or questions is whether smoking will be permitted on patio areas smoking is only
prohibited in indoor areas therefore open air patios are exempt Following this discussion and
revision of the ordinance staff will distribute the updated proposed ordinance to the above
businesses for their comments
When staff presented the Smoking Shelter ordinance to the Planning Commission there was a
requirement of a 25 foot separation between the shelter and any entrances exits open windows and
ventilation intakes of public places After applying this restriction to some businesses restaurants
within the City it became clear that many shelters would be located in the parking lot This would
be a direct conflict with the requirement to locate the structure in the rear or side yard as well as
occupy required parking spaces The State does not restrict the distance smoking must be from an
exit window etc This requirement is being removed from the ordinance
Staff has added the stipulation that the smoking structure may not reduce or impede the primary
structure s ingress or egress The intent of this requirement is to prohibit locating a structure canopy
in an area that patrons must walk through in order to enter or exit an establishment The question
becomes how do we differentiate a smoking structure from an entrance canopy A proposed
structure intended to be a smoking structure will not be permitted at an entrance at the time of the
building or zoning permit application
Another requirement that was in the original ordinance proposal was that the structure must be
detached from the principle structure This was in conjunction with the 25 foot separation
requirement addressed above Again the State does not regulate a separation between building
openings and smoking structures Staff worked with the Building Official and Fire Marshal and
concluded that the requirement to meet building and fire code was sufficient in determining whether
a structure could be attached to the principle structure
The Building Official and Fire Marshal also added requirements pertaining to the required ash trays
rubbish containers fire extinguisher and possible sprinkling The sprinkling requirement will be
determined with each structure as it comes in for a building or zoning permit the need for sprinkling
will be dependent on if the proposed structure has a roof as well as the type of flooring For
example if the structure is built over a wood deck that is open to debris collecting underneath this
could be a possible fire hazard and may require fire sprinkling
6
Todd Gerhardt
Smoking Shelter Ordinance
October 22 2007
Page 3
DRAFT ORDINANCE
Sec 20 904 d Accessory outdoor smoking facilities public places
1 An outdoor smoking shelter shall be located within the buildable lot area in the rear or side
yard
2 The smoking shelter must be aesthetically compatible with the overall architecture of the
building or development
3 Smoking shelters shall not be more than 50 enclosed at anytime
4 Smoking shelters locations may not reduce or impede the primary structures ingress or
egress
5 Service of food and alcoholic and non alcoholic beverages is prohibited in and to smoking
shelters
6 Roofed and or floor assemblies may necessitate fire sprinkling
7 Fixed noncombustible ashtrays are required
8 Noncombustible rubbish containers with lids are required
9 Fire extinguisher min 4A60BC must be located within the structure
10 Smoking shelters must comply with Building and Fire Code
11 Smoking Shelters must receive a building and or Zoning permit prior to installation
The following definitions are proposed additions to Chapter 1 in conjunction with the Smoking
Shelter ordinance
Indoor area means all space between a floor and a ceiling that is bounded by walls doorways
or windows whether open or closed A wall for the purpose of smoking shelters includes any
retractable divider garage door or other physical barrier whether temporary or permanent
Public transportation means public means of transportation including light and commuter rail
transit buses enclosed bus and transit stops taxis vans limousines and other for hire
vehicles other than those being operated by the lessee and ticketing boarding and waiting
areas in public transportation terminals
Smoking means inhaling or exhaling smoke from any lighted cigar cigarette pipe or any
other lighted tobacco or plant product Smoking also includes carrying a lighted cigar
cigarette pipe or any other lighted smoking equipment tobacco or plant product intended for
inhalation
g plan bg cily codesepl revisions 2007 chapler 20 smoking sheller work session doc
7
Freedom to Breathe FAQ Clean Indoor Air Act Environmental Health in Minnesota Page 1 of 6
Frequently Asked Questions of the Freedom to Breathe Provisions in the Minnesota
Clean Indoor Air Act
What is the Freedom to Breathe FTB
When were the provisions of the MCIAA changed by the Legislature
What is the intention of the most recent changes
Why is it important to protect nonsmokers from second hand smoke
What are some examples of smoking prohibited area l
What is the definition of indoor area
What are the responsibilities of proprietors
Are there provisions in the I w about smoking ou1sid 1
Is there a difference in the way the new provisions applies to owned and leased facilities
What effect does the new MCIAA have on local qovernment s ability to adopt more stringent
s rnoking re9ulations
Are there penaltif sJL1LPIQQIietor allows smoking irUtrea rohibited by the law
Will the FTB have a negative effect on Charitable gambling in Minnesota
What Cqn I do if I lose my job in the hospitality indlLstry as a result of FTB
8re there resources available for workplaces to gO smoke free
What can I do if I observe a violation to the MCIAA
Will smoking still bEUlJ1Qwed in existing1PRrove Ldeslg nated smoking permitted lounges and
private offices after October 1 20077
Can smoking be allowed in a shelter that is located some distance away from the building
How do es the new Freedom to Breath Act impact SJI10king on outdoor Ratios of bars and
r staurants
If we choose to allow outdoor smoking can our servers wait on the patrons outside
Does the new smoking ban apply to support group meetings and meeting facilities
Will smoking be prohil ited in the common areas of condominium and cooperative housing
buildings
What abollt smoke drifting from a privateLesiden e into CLQublic place
Is there a certain distance you must be from a door or window to be allowed to smoke
Are the casinos required to comply with the FTB
Is an employer required to provide an outdoor smoking area for employees
What is the Freedom to Breathe FTB
FTB refers to new provisions that expand the current Minnesota Clean Indoor Air Act
When were the provisions of the MCIAA changed by the Legislature
The 2007 Legislature amended the MCIAA to prohibit smoking in virtually all indoor public places
and indoor places of employment
What is the intention of the most recent changes
The amended MCIAA is intended to protect employees and the public from the health hazards of
secondhand smoke
Why is it important to protect nonsmokers from second hand smoke
httn Iwww health state mn lls di vs eh indoorairlmd aa fth fan htm 1 Q 007
8
Freedom to Breathe FAQ Clean Indoor Air Act Environmental Health in Minnesota Page 2of6
Secondhand smoke is a leading cause of preventable death in the United States In 2005 it was
estimated that each year exposure to secondhand smoke in the United States kiils more than
3 000 adult nonsmokers from lung cancer and approximately 46 000 from coronary heart
disease According to the U S Surgeon General there Is no safe level of exposure to
secondhand smoke Secondhand smoke causes premature death and disease in children and in
adults who do not smoke
What are some examples of smoking prohibited areas
Smoking will be prohibited in virtually all indoor public places and indoor places of employment
including
Bars restaurants and private clubs
Office and industrial workplaces
Retail stores
Common areas of rental apartment buildings and hotels
Public transportation including taxis
Work vehicles if more than one person is present
Home offices with one or more on site employees or used as a place to meet or deal with
customers
Public and private educational facilities
Auditoriums arenas and meeting rooms
Day care premises
Health care facilities and clinics
Go to QQ
What is the definition of indoor area
Indoor Area means all space between a floor and a ceiling that is bounded by walls doorways
or windows whether open or closed covering more than 50 percent of the combined surface
area of the vertical planes wall space constituting the perimeter of the area whether
temporary or permanent A standard window screen or like building component is not
considered a wall
What are the responsibilities of proprietors
In general they are required to
Post No Smoking signs at or near all public entrances
Ask persons who smoke in prohibited areas to refrain from smoking or require the person
to leave the facility if they refuse to refrain from smoking
Use lawful methods consistent with handling disorderly persons for patrons that refuse to
comply
Refrain from providing ashtrays and other smoking equipment
Withhold service for noncompliant patrons
Are there provisions in the law about smoking outside
The Minnesota Clean Indoor Air Act does not regulate smoking outside of buildings At this time
there is no statewide law regulating the act of smoking outside of buildings regardless of
distance from a building or building opening Property owners may choose to create restrictions
regarding smoking areas outside of their buildings on their property Some county and city
1 II
9
Freedom to Breathe FAQ Clean Indoor Air Act Environmental Health in Minnesota Page 3 of 6
governments do prohibit smoking within a certain distance outside of their buildings and at
outdoor parks and recreation facilities Check with your local government to determine if such
rules apply where you live
Go to QQ
Is there a difference in the way the new provisions applies to owned and leased
facilities
No
What effect does the new MCIAA have on local government s ability to adopt more
stringent smoking regulations
Local governments will retain the power to adopt more stringent measures to protect individuals
from secondhand smoke
Are there penalties if a proprietor allows smoking in areas prohibited by the law
Any proprietor person or entity that owns leases manages operates or otherwise controls
the use of the area in which smoking is prohibited and knowingly fails to comply with the
provisions of the law is guilty of a petty misdemeanor under criminal law MDH also has the
authority to take enforcement actions that may include monetary penalties up to 10 000 Local
public health agencies have various enforcement tools as well under their own civil enforcement
authority including fines potential license suspensions or revocations
Will the FTB have a negative effect on Charitable gambling in Minnesota
The state Gambling Control Board will prepare a report on the law s possible impact on
charitable gambling The act requires the board to submit a report to the Governor and the
Legislature before March 31 2008
What can I do if I lose my job in the hospitality industry as a result of FTB
The Minnesota Jobs Skills Partnership Board will provide services under the dislocated worker
program to certain employees who become unemployed between October 1 2007 and October
1 2009 because of the provisions of the act
Go to QQ
Are there resources for workplaces to go smoke free
CDC Smoking and Tobacco Use Consumer Summaries and Guides
Secondhand Smoke What It Means to You
Save Lives Save Money Make Your Business Smoke Free
Making Your Workolace Smokefree A Decision Maker s Guide
The Tobacco Law Center s at the William Mitchell College of Law has information on the
changes to the MCIAA The Center s WorkSHIFTS project provides educational and policy
resources on Minnesota workplace related secondhand smoke and cessation coverage issues
httn www health state mn lIs di vs hlindoorlirlmr i ll fth flO htm 1 Q f nn7
10
Freedom to Breathe FAQ Clean Indoor Air Act Environmental Health in Minnesota Page 4 of6
What can I do if I observe an MClAA violation
If you observe a violation of the MCIAA you should notify management of the facility and ask
that corrective action be taken to comply with the MCIM MDH has a Compliance Assistance
Letter available for the public to use on our website at
http www health state mn us divs eh indoorair mciaa ftb index html
This letter can be sent anonymously if needed to protect the identity of the concerned person
The letter serves to notify management that a violation of the MCIM was observed and reminds
management of the facility of their responsibility to comply with the MCIM and enforcement
actions that may be taken if they do not come into compliance Given the scope of facilities that
are regulated by this new smoking law MDH is asking for support in the area of compliance
assistance If violators are not willing to comply once given a fair opportunity to correct
observed violations MDH should be notified to pursue formal enforcement action
Go to 1QQ
Will smoking still be allowed in existing approved designated smoking permitted
lounges and private offices after October 1 2007
When the Freedom to Breathe FTB amendments to the Minnesota Clean Indoor Air Act
MCIAA take effect on OCtober 1 2007 smoking will be prohibited in virtually all indoor public
places and places of work with very few exceptions Smoking lounges and private offices that
meet the current MCIAA will no longer be compliant as of that date and there are no
grandfathering provisions in the law that would allow the continued operations of existing
designated smoking permitted areas
Can smoking be allowed in a shelter that is located some distance away from the
building
The Freedom to Breathe FTB amendments to the Minnesota Clean Indoor Air Act wiil
effectively prohibit smoking in all indoor areas of the state except private homes and vehicles
when not being used as a workplace on October 1 2007 Employee lounges are considered a
place of employmentas defined in the FTB amendments Place of employment includes but is
not limited to employee cafeterias loungesAssuch if it is your intention to provide shelter
for smokers that complies with the new law the structure must not meetthe definition of an
indoor area it must therefore be an outdoor space It can have a roof and floor but the wall
space vertical planes of the perimeter must be greater than 50 open or consist of standard
window screen material Actual windows open or closed are considered walls
Go to 1QQ
How does the new Freedom to Breath Act impact smoking on outdoor patios of bars
and restaurants
The Freedom to Breathe FTB amendments to the Minnesota Clean Indoor Air Act prohibits
smoking in indoor areas of bars and restaurants It does not regulate any aspect of outdoor
smoking As such the answer to the question hinges on whether the patio is considered an
indoor area or outdoor area If the patio in question has a floor and ceiling it is considered an
indoor area if 50 or more of the surface area of the wall space vertical planes of the
perimeter is solid including windows open or closed Standard window screen material does
not count as a solid material
htt lu7uln holth ettf o n nCt rl n o h r1 n
I nn n 1 l it ll 7
11
Freedom to Breathe FAQ Clean Indoor Air Act Environmental Health in Minnesota Page 5 of 6
If a proprietor chooses to allow outdoor smoking can their servers wait on the
patrons outside
Neither the existing Minnesota Clean Indoor Air Act MCIAA nor the Freedom to Breathe
provisions effective October 1 2007 regulate outdoor smoking regardless of distance from
building openings like doors or windows As such there would be no restrictions for servers in
outdoor areas
Does the new smoking ban apply to support group meetings e g AA NA etc and
meeting facilities
If a meeting is open to the public the facility where the meeting is being held would be
considered a public place during that time As of October 1 2007 smoking will be prohibited in
virtually all public places with very few exceptions the statute makes no exceptions for
private clubs
Go to QQ
Will smoking be prohibited in the common areas of condominium and cooperative
housing buildings
Common areas of condominium and cooperative housing buildings are considered private
residences As such smoking in these areas is unregulated
What about smoke drifting from a private residence into a public place
The Minnesota Clean Indoor Air Act MCIAA and the new Freedom to Breathe provisions of the
MCIAA effective October 1 2007 regulate the act of smoking within indoor public places and
places of employment The statute does not regulate smoke drifting from an area where
smoking is unregulated such as a private residence
Is there a certain distance you must be from a door or window to be allowed to
smoke
The Freedom to Breathe FTB amendments to the Minnesota Clean Indoor Air Act MCIAA will
prohibit smoking throughout indoor areas of virtually all public places and places of
employment effective October 1 2007 Outdoor smoking is completely unregulated by the
MCIAA regardless of distance from building openings such as windows and doorways Some
local smoking ordinances however do have smoking setback provisions In this case the
stronger ordinance would apply and be enforced on the local level
Go to tQ2
Are casinos required to comply with the FTB
Facilities that are located on tribal land are considered part of sovereign nations and therefore
are not covered by state regulations such as the Freedom to Breathe amendments to the
Minnesota Clean Indoor Air Act MCIAA Establishments operated by tribal governments that
are NOT located on tribal land are subject to state regulations
Is an employer required to provide an outdoor smoking area for employees
httD llwww health state mn us divs eh indoorair mciaalfth fao htmI 912612007
12
Freedom to Breathe FAQ Clean Indoor Air Act Environmental Health in Minnesota Page 6 of6
The Minnesota Clean Indoor Air Act does not require employers to provide areas for employeestosmoke
Please contact the Minnesota Department of Health at 651 201 4601 or 1 800 798 9050 or byemailatmciaaqhealthstatemnus
For more information about the MCIAA please visit our website at
http www health state mn us divs ehlindoorair mciaa ftblindex html
Minnesota Department of Health
P O Box 64975
St Paul MN 55164 0975
651 201 4601
800798 9050 toll free outside the metro area
651 201 5797 TIY
mciaa@health state mn us
Go to QQ
For questions about this page or indoor air quality please contact the Indoor Air Unit at indoorair6lhealth state mn us6512014601or8007989050
Updated Friday 21 Sep 2007 09 27 12 CDT
httn I u holth ntb uIII 1 nJ A I Ic L c L l
13
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952227 1110
Web Site
WINIci chanhassen mn us
B
MEMORANDUM
TO Mayor City Council Members
Greg Sticha Finance Director 7FROM
DA TE V YL0October222007
SUBJ 2008 Department Budgets
BACKGROUND
As part of our budget process each year the individual departments present their
requested budgets for the upcoming year During the work session on
October 22 the departments of Community Development EngineeringlPublic
Works and Park Recreation will be presenting their budgets for 2008
Before the start of the first presentation I will be giving you an update on a few
items that have an impact on the final budget levy that we discussed in earlier
work sessions I have included a copy of the current budget for the general fund
for 2008 There are a few minor changes in this budget dealing with salaries and
wages that we will discuss at the work session
The City 01 Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play14
CITY OF CHANHASSEN
2008 BUDGET
REVENUE
101 General Fund
2006 2007 2007 2008 Inc Over
ACCOUNT DESCRIPTION ACTUAL BUDGET PROJECTED BUDGET PY Budget
GENERAL PROPERTY TAX
3010 Current Property Tax 6 121408 6 558 100 6 558 100 6 821 700 4 0
3002 Allowance for Delinquent Taxes 320 000 320 000 320 000
3011 Delinquent Property Tax 63 896 50 000 50 000 50 000
3041 Homestead Ag Credit
3090 Other Property Taxes 8
3500 Local Government Aid
TOTAL GENERAL PROPERTY TAX 6 185 312 6 288 100 6 288 100 6 551 700 4 2
LICENSES
3203 Dog Kennel 900 500 500 500
3205 Dog or Cat 5 257 4 500 4 500 5 000
3213 Solicitor 300 500 500 500
3223 3 2 Off and On Sale 2 225
3226 Liquor On and Off Sale 79 977 84 000 84 000 84 000
3227 Club and Sunday 1 600
3230 Rental Housing Licenses 5 950 15 000 15 000 15 000
3284 Rubbish 3 600 3 000 3 000 3 000
TOTAL LICENSES 99 809 107 500 107 500 108 000 0 5
PERMITS
3301 Building 700450 825 000 725 000 725 000
3302 Plan Check 365 892 330 000 330 000 330 000
3305 Heating AlC 119 392 120 000 120 000 120 000
3306 Plumbing 94 641 85 000 85 000 95 000
3307 Trenching 42 707 35 000 35 000 35 000
3308 Gun 700 1 000 1 000 1 000
3309 Sprinkler 11 448 14 000 14 000 14 000
3311 Sign 7 255 6 500 6 500 7 500
3320 Stable 220 300 300 300
3330 Elec Permit App Forms 104
3331 Firework s Application Fee 400
3390 Misc Permits 2 945 1 000 1 000 2 000
TOTAL PERMITS 1 346 155 1417 800 1 317 800 1 329 800 5 7
FINES PENALTIES
3401 Traffic Ordinance Violation 152 365 130 000 140 000 150 000
3402 Vehicle Lockouts 2450 2 500 2 500 2 500
3404 Dog Cat Impound 6 583 4 000 4 000 5 000
3405 Other Fines and Penalties 1 548
TOTAL FINES PENALTIES 162 946 136 500 146 500 157 500 154
INTERGOVERNMENTAL REVENUE
3509 Other Shared Taxes 175 685 165 000 165 000 175 000
3510 Grants State 61424 40 000 40 000 50 000
TOTAL INTERGOVERNMENTAL REV 237 109 205 000 205 000 225 000 9 8
15
CITY OF CHANHASSEN
2008 BUDGET
REVENUE
101 General Fund
2006 2007 2007 2008 Inc Over
ACCOUNT DESCRIPTION ACTUAL BUDGET PROJECTED BUDGET PY Budget
CHARGES FOR CURRENT SERVICES
3601 Sale of Documents 979 4 000 1 000 1 000
3602 Use Variance Permits 52 360 45 000 35 000 40 000
3603 Rezoning Fees 2 500 2 000 2 000 2 000
3604 Assessment Searches 720 500 500 500
3605 Plat Recording Fees 15 288 10 000 7 000 7 000
3607 Election Filing Fees 30
3613 Misc General Government 8 026 10 000 10 000 10 000
3614 Admin Charge 2 Constr 146 687 120 000 50 000 50 000
3615 Admin Charge 5 Street Re Constr 32 000
3617 Engineering General 1 336 1 000 1 000 1 000
3619 Investment Management Fee 75 000 75 000 75 000 75 000
3629 Misc Public Safety 6 138 4 000 4 000 5 000
3630 Recreation Program Fees 24 813 30 000 30 000 30 000
3631 Recreation Center 121 671 135 000 125 000 125 000
3633 Park Equipment Rental 222 200 200 200
3634 Park Facility Usage Fee 9 747 12 000 12 000 12 000
3635 Watercraft Rental 4466 4 000 4 000 4 000
3636 Self Supporting Programs 172 924 160 000 175 000 175 000
3637 Senior Programs 27 078 30 000 30 000 30 000
3638 Food Concessions 11 971 12 000 12 000 12 000
3639 Misc Park Rec 765 800 800 800
3641 Youth Sport Donation 32
3649 Misc Public Works 14400 5 000 5 000 5 000
3651 Merchandise Sales 1 886 1 500
3670 Internment Fee 250
TOTAL CURRENT SERVICES 699 290 660 500 579 500 619 000 6 3
OTHER REVENUE
3801 Interest Earnings 133405 70 000 110 000 125 000
3802 Equipment Rental Sale 107 384 110 000 110 000 125 000
3803 Building Rental 1 613
3804 Land Sale 1 600
3807 Donations 26 122 20 000 20 000 20 000
3808 Ins Recoveries Reimburse 10 024 5 000 5 000 5 000
3816 SAC Retainer 70 169 5 000 155 000 5 000
3818 Sur Tax Retainer 954 1 500 1 500 1 500
3820 Misc Other Revenue 110 5 000 1 000 1 000
3829 I nterestJPenalties Othe r 500 500 500
3903 Refunds Reimbu rsements 34 546 30 000 30 000 30 000
3910 Misc Revenue 323
TOTAL OTHER REVENUE 386 249 247 000 433 000 313 000 26 7
TOTAL GENERAL FUND REVENUE 9 116 869 9 062 400 9 077 400 9 304 000 2 7
TOTAL GENERAL FUND EXPENDITURES 9 304 000
NET LEVY REMAINING Use of Gen Fund Reserves
16
GENERAL GOVERNMENT
1110 Legislative
1120 Administration
1130 Finance
1140 Legal
1150 Assessing
1160 MIS
1170 City Hall
1180 Elections
1190 Library Building
TOTAL
LAW ENFORCEMENT
1210 Law Enforcement
1220 Fire
1250 Building Inspection
1260 CSO
TOTAL
PUBLIC WORKS
1310 Engineering
1320 Street Maintenance
1350 Street Lighting
1370 Vehicle Maintenance
TOTAL
COMMUNITY DEVELOPMENT
1410 Planning Commission
1420 Planning Administration
1430 Senior Commission
TOTAL
PARKS RECREATION
1510 Park Rec Commission
1520 Park Administration
1530 Recreation Center
1540 Lake Ann
1550 Park Maintenance
1560 Senior Center
1600 Recreation Programs
1700 Self Supporting Programs
TOTAL
Total Operational Expenditures
Transfer to Debt Service
TOTAL GENERAL FUND
CITY OF CHANHASSEN
2008 BUDGET
Expenditures
Personal Materials Contractual Capital 2007
Services Supplies Services Outlay Total Total Change
34 200 200 100 500 134 900 123400 9 32
378 700 500 59 900 439 100 438 000 0 25
221 000 300 91 500 200 313 000 318 000 1 57
168 000 168 000 168 000 0 00
101 600 101 600 100 100 1 50
165 800 2400 119 300 287 500 281 200 2 24
69 100 42 300 282 100 393 500 428 600 8 19
21 500 6 400 27 900 19 700 41 62
3 000 107 200 110 200 102 200 7 83
890 300 48 700 1 036 500 200 1 975 700 1 979 200 0 18
75 900 1427 000 1 502 900 1 333 700 12 69
517 700 47 000 116 000 680 700 678 600 0 31
730 600 8 700 23 400 762 700 756 100 0 87
55 300 4 000 13 700 73 000 69 200 549
1 379 500 59 700 1 580 100 3 019 300 2 837 600 640
516 700 900 29 900 300 547 800 528400 3 67
607 700 133 500 33 000 1 300 775 500 786 500 140
4 500 315400 319 900 314 900 1 59
245 700 150400 46 500 6 000 448 600 459 600 2 39
1 370 100 289 300 424 800 7 600 2 091 800 2 089 400 0 11
200 4 000 4 200 4 200 0 00
373 200 700 14 100 388 000 377 600 2 75
20 300 15 200 35 500 30 100 17 94
393 500 900 33 300 427 700 411 900 3 84
200 2 000 2 200 2 200 0 00
120 000 1 000 9 600 130 600 123 500 5 75
213 500 11 500 47 800 272 800 269 100 1 37
13 800 9 100 51400 74 300 71 800 348
670 200 81 300 88 200 4 000 843 700 819 600 2 94
36 900 4 300 19 500 60 700 52400 15 84
167 100 17 100 93 500 277 700 274 200 1 28
36 100 8 700 82 700 127 500 131 500 3 04
1 257 600 133 200 394 700 4 000 1 789 500 1 744 300 2 59
5 291 000 531 800 3 469400 11 800 9 304 000 9 062400 2 67
9 304 000 9 062 400 2 67
17
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1250 Code Enforcement
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 458 938 524 000 536 000 2 3
4011 Overtime Reg 4 106 2 000 4 000 100 0
4020 Salaries Wages Temp 30 000 30 000 0 0
4030 Contributions Retirement 60 022 72 900 72 900 0 0
4040 Contributions nsurance 69 566 91 700 84 300 8 1
4050 Workers Compensation 2 843 3 400 3400 0 0
TOTAL PERSONAL SERVICES 595475 724 000 730 600 0 9
4120 Supplies Equipment 35 1 000 1 000 0 0
4130 Supplies Program 127 800 800 0 0
4140 Supplies Vehicles 1 487 1 500 1 500 0 0
4210 Books Periodicals 889 3 500 3 500 0 0
4240 Uniforms Clothing 891 1 500 1 500 0 0
4260 Small Tools Equipment 73 400 400 0 0
TOTAL MATERIALS SUPPLIES 3 501 8 700 8 700 0 0
4300 Fees Services 83 1 000 1 000 0 0
4310 Telephone 2 858 4 000 4 000 0 0
4340 Printing Publishing 1 017 2 000 2 000 0 0
4360 Subscriptions Memberships 520 1 000 1 000 0 0
4370 Travel Training 5 561 11 000 11 000 0 0
4375 Promotional Expense 200 200 0 0
4440 License Registration 371 200 200 0 0
4520 Repair Maintenance Vehicles 639 1 500 1 500 0 0
4530 Repair Maintenance Equip 1 488 2 500 2 500 0 0
4901 Refu nds Reimbu rsements 550 0 0
4933 Sales Tax 7 0 0
TOTAL CONTRACTUAL SERVICES 13 093 23400 23400 0 0
TOTAL CODE ENFORCEMENT 612 069 756 100 762 700 0 9
18
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1310 Engineering
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 342 989 383 900 402 100 4 7
4011 Overtime Reg 1 595 1 000 1 500 50 0
4020 Salaries Wages Temp 10 980 10 000 12 000 20 0
4021 Temp Seasonal Overtime 8 0 0
4030 Contributions Reti rement 46412 53400 56 900 6 6
4040 Contributions I nsu ranee 35 977 46 300 41 600 10 2
4050 Workers Compensation 2 178 2 800 2 600 7 1
4060 Unemployment 11 845 0 0
TOTAL PERSONAL SERVICES 451 984 497400 516 700 3 9
4120 Supplies Equipment 32 200 200 0 0
4140 Supplies Vehicles 264 300 300 0 0
4210 Books Periodicals 335 400 400 0 0
TOTAL MATERIALS SUPPLIES 631 900 900 0 0
4300 Fees Services 58 815 18 000 18 000 0 0
4303 Engineering Consulting 2 008 0 0
4310 Telephone 1 845 2 000 2 000 0 0
4330 Postage 400 400 0 0
4340 Printing Publishing 1 297 1 100 1 100 0 0
4360 Subscriptions Memberships 1 405 1 200 1 200 0 0
4370 Travel Training 1 485 3 000 3 000 0 0
4380 Mileage 200 300 50 0
4440 License Registration 29 300 300 0 0
4520 Repair Maintenance Vehicles 500 500 0 0
4530 Repair Maintenance Equip 1 879 3 000 3 000 0 0
4531 Repair Maintenance Radios 100 100 0 0
4933 Sales Tax 22 0 0
TOTAL CONTRACTUAL SERVICES 68 784 29 800 29 900 0 3
4705 Other Equipment 300 300 0 0
TOTAL CAPITAL OUTLAY 300 300 0 0
TOTAL ENGINEERING 521 399 528 400 547 800 3 7
19
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1320 Street Maintenance
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 415 251 436400 446 000 2 2
4011 Overtime Reg 5 104 10 000 5 500 45 0
4020 Salaries Wages Temp 8 748 17 800 10 000 43 8
4030 Contributions Retirement 58 904 60 700 63 100 4 0
4040 Contributions I nsu rance 59 172 72 900 63 000 13 6
4050 Workers Compensation 18 960 17 500 20 100 14 9
TOTAL PERSONAL SERVICES 566 140 615 300 607 700 1 2
4120 Supplies Equipment 35 253 47 000 44 000 6 4
4140 Supplies Vehicles 24 623 28 000 28 000 0 0
4150 Maintenance Materials 53 319 55 000 55 000 0 0
4160 Chemicals 67 0 0
4170 Motor Fuels Lubricants 2 574 0 0
4210 Books Periodicals 100 100 0 0
4240 Uniforms Clothing 3 603 3 700 3 700 0 0
4260 Small Tools Equipment 392 2 700 2 700 0 0
TOTAL MATERIALS SUPPLIES 119 830 136 500 133 500 2 2
4300 Fees Services 179 1 000 1 000 0 0
4310 Telephone 3 292 3 500 3 500 0 0
4340 Printing Publishing 59 300 300 0 0
4350 Cleaning Waste Removal 19 300 300 0 0
4360 Subscriptions Memberships 1 118 100 100 0 0
4370 Travel Training 769 1 500 1 500 0 0
4410 Rental Equipment 1 500 1 500 0 0
4440 License Registration 571 600 600 0 0
4510 Repair Maintenance Building 500 500 0 0
4520 Repair Maintenance Vehicles 5 905 2400 3 500 45 8
4530 Repair Maintenance Equip 1 020 5 500 5 500 0 0
4531 Repair Maintenance Radios 2 000 500 75 0
4540 Repair Maintenance Streets 17 650 500 500 0 0
4560 Repair Maintenance Signs 12455 13 700 13 700 0 0
4933 Sales Tax 1 493 0 0
TOTAL CONTRACTUAL SERVICES 44 530 33400 33 000 1 2
4703 Office Equipment 300 300 0 0
4705 Other Equipment 700 1 000 1 000 0 0
TOTAL CAPITAL OUTLAY 700 1 300 1 300 0 0
TOTAL STREET MAINTENANCE 731 200 786 500 775 500 1 4
20
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1350 Street Lighting Signals
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4120 Supplies Equipment 4445 4 500 4 500 0 0
TOTAL MATERIALS SUPPLIES 4445 4 500 4 500 0 0
4300 Fees Services 300 300 0 0
4310 Telephone 499 600 600 0 0
4320 Utilities 282 764 290 000 295 000 1 7
4530 Repair Maintenance Equip 1 678 2 500 2 500 0 0
4565 Repair Maintenance Lights Signals 11 499 17 000 17 000 0 0
TOTAL CONTRACTUAL SERVICES 296 440 310 400 315 400 1 6
TOTAL STREET LIGHT SIGNALS 300 885 314 900 319 900 1 6
21
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1370 City Garage
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 202 322 187 400 177 700 5 2
4011 Overtime Reg 4 307 6 500 6 500 0 0
4030 Contributions Retirement 23 196 26 100 25 100 3 8
4040 Contributions Insurance 28 738 32 000 30 600 4 4
4050 Workers Compensation 5 584 6 000 5 800 3 3
TOTAL PERSONAL SERVICES 264 146 258 000 245 700 4 8
4120 Supplies Equipment 1 392 3 300 3 300 0 0
4140 Supplies Vehicles 371 500 500 0 0
4150 Maintenance Materials 1 530 1 000 1 000 0 0
4170 Motor Fuels Lubricants 95 799 140 000 140 000 0 0
4240 Uniforms Clothing 1 586 1 200 1 200 0 0
4260 Small Tools Equipment 3 062 4400 4400 0 0
TOTAL MATERIALS SUPPLIES 103 739 150400 150400 0 0
4300 Fees Services 1 425 1 300 1 300 0 0
4310 Telephone 2 991 3 800 3 800 0 0
4320 Utilities 19 200 23 000 23 000 0 0
4340 Printing Publishing 59 100 100 0 0
4350 Cleaning Waste Removal 9 186 6 100 7400 21 3
4360 Subscriptions Memberships 200 200 0 0
4370 Travel Training 170 1 500 1 500 0 0
4410 Rental Equipment 349 500 500 0 0
4440 License Registration 65 500 500 0 0
4510 Repair Maintenance Building 6 269 4 000 4 000 0 0
4520 Repair Maintenance Vehicles 37 300 300 0 0
4530 Repair Maintenance Equip 1 586 3 800 3 800 0 0
4531 Repair Maintenance Radios 100 100 0 0
4933 Sales Tax 32 0 0
TOTAL CONTRACTUAL SERVICES 41 368 45 200 46 500 2 9
4703 Office Equipment 292 500 500 0 0
4705 Other Equipment 4 773 5 500 5 500 0 0
TOTAL CAPITAL OUTLAY 5 065 6 000 6 000 0 0
TOTAL CITY GARAGE 414 318 459 600 448 600 2 4
22
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1410 Planning Commission
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4210 Books Periodicals 200 200 0 0
TOTAL MATERIALS SUPPLIES 200 200 0 0
4340 Printing Publishing 4 600 3 000 3 000 0 0
4360 Subscriptions Memberships 200 200 0 0
4370 Travel Training 601 800 800 0 0
TOTAL CONTRACTUAL SERVICES 5 201 4 000 4 000 0 0
TOTAL PLANNING COMMISSION 5 201 4 200 4 200 0 0
23
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1420 Planning Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 271 977 283 200 289 700 2 3
4030 Contributions Retirement 35 822 39400 41 000 4 1
4040 Contributions I nsurance 38 246 39 200 41 300 54
4050 Workers Compensation 965 1 000 1 200 20 0
TOTAL PERSONAL SERVICES 347 011 362 800 373 200 2 9
4120 Supplies Equipment 77 300 300 0 0
4130 Supplies Program 7 100 100 0 0
4140 Supplies Vehicles 81 100 100 0 0
4210 Books Periodicals 200 200 0 0
TOTAL MATERIALS SUPPLIES 165 700 700 0 0
4300 Fees Services 45 5 000 5 000 0 0
4310 Telephone 77 200 200 0 0
4340 Printing Publishing 200 200 0 0
4360 Subscriptions Memberships 1 150 1 500 1 500 0 0
4370 Travel Training 2 885 7 000 6400 8 6
4440 License Registration 15 600 0 0
4520 Repair Maintenance Vehicles 200 200 0 0
TOTAL CONTRACTUAL SERVICES 4 172 14 100 14 100 0 0
TOTAL PLANNING ADMINISTRATION 351 347 377 600 388 000 2 8
24
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1430 Senior Commission
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 15 290 15 900 16 200 1 9
4030 Contributions Reti rement 2 049 2 200 2 300 4 5
4040 Contributions I nsurance 1 572 1 700 1 700 0 0
4050 Workers Compensation 54 100 100 0 0
TOTAL PERSONAL SERVICES 18 965 19 900 20 300 2 0
4300 Fees Services 8416 9 500 14 500 52 6
4370 Travel Training 18 200 200 0 0
4375 Promotional Expense 32 500 500 0 0
TOTAL CONTRACTUAL SERVICES 8466 10 200 15 200 49 0
TOTAL SENIOR COMMISSION 27 431 30 100 35 500 17 9
25
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1510 Park Rec Commission
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4130 Supplies Program 100 100 0 0
4210 Books Periodicals 100 100 0 0
TOTAL MATERIALS SUPPLIES 200 200 0 0
4340 Printing Publishing 1 138 900 900 0 0
4360 Subscriptions Memberships 700 700 0 0
4370 Travel Training 380 400 400 0 0
TOTAL CONTRACTUAL SERVICES 1 517 2 000 2 000 0 0
TOTAL PARK REC COMMISSION 1 517 2 200 2 200 0 0
26
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1520 Park Rec Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 86 525 89 200 95 200 6 7
4030 Contributions Retirement 11 229 12400 13400 8 1
4040 Contributions Insurance 10 143 11 400 11 000 3 5
4050 Workers Compensation 307 400 400 0 0
TOTAL PERSONAL SERVICES 108 205 113400 120 000 5 8
4120 Supplies Equipment 106 500 500 0 0
4130 Supplies Program 200 200 0 0
4210 Books Periodicals 100 100 0 0
4240 Uniforms Clothing 200 200 0 0
TOTAL MATERIALS SUPPLIES 106 1 000 1 000 0 0
4300 Fees Services 1 100 1 100 0 0
4310 Telephone 587 900 900 0 0
4330 Postage 1 307 400 400 0 0
4340 Printing Publishing 14 166 1 500 1 500 0 0
4360 Subscriptions Memberships 1 962 1 200 1 600 33 3
4370 Travel Training 1 802 3 800 3 800 0 0
4380 Mileage 27 200 300 50 0
4807 Property Tax Expense 12 0 0
TOTAL CONTRACTUAL SERVICES 19 863 9 100 9 600 5 5
TOTAL PARK REC ADMINISTRATION 128 174 123 500 130 600 5 7
27
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1530 Recreation Center
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 41 200 43 300 43 700 0 9
4020 Salaries Wages Temp 123 342 132 000 132 000 0 0
4030 Contributions Retirement 21 617 28 000 28 000 0 0
4040 Contributions Insurance 6 063 6 600 6 600 0 0
4050 Workers Compensation 3 049 4 200 3 200 23 8
4060 Unemployment 82 0 0
TOTAL PERSONAL SERVICES 195 354 214 100 213 500 0 3
4120 Supplies Equipment 672 8 000 8 000 0 0
4130 Supplies Program 12 334 3 000 3 000 0 0
4150 Maintenance Materials 500 500 0 0
TOTAL MATERIALS SUPPLIES 13 006 11 500 11 500 0 0
4300 Fees Services 284 500 500 0 0
4310 Telephone 3 137 1 500 2 500 66 7
4320 Utilities 36 382 36 500 37 500 2 7
4340 Printing and Publishing 524 0 0
4360 Subscriptions Memberships 253 300 300 0 0
4370 Travel Training 164 400 400 0 0
4375 Promotional Expense 1 598 300 1 600 433 3
4510 Repair Maintenance Building 2 904 2 500 3 000 20 0
4530 Repair Maintenance Equip 439 1 000 1 000 0 0
4590 Misc Contractual Services 2 622 500 1 000 100 0
TOTAL CONTRACTUAL SERVICES 48 307 43 500 47 800 9 9
TOTAL RECREATION CENTER 256 666 269 100 272 800 1 4
28
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1540 Lake Ann Park Operations
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4020 Salaries Wages Temp 9 130 12 800 12 200 4 7
4021 Overtime Temp 60 500 500 0 0
4030 Contributions Retirement 703 800 800 0 0
4050 Workers Compensation 215 300 300 0 0
TOTAL PERSONAL SERVICES 10 108 14400 13 800 4 2
4120 Supplies Equipment 3 349 3 800 100 0
4130 Supplies Program 10 654 9 100 8 600 55
4240 Uniforms Clothing 500 500 500 0 0
TOTAL MATERIALS SUPPLIES 14 503 13400 9 100 32 1
4300 Fees Services 26 759 31 800 31 800 0 0
4310 Telephone 3 069 3 600 3 600 0 0
4320 Utilities 9 171 8 300 15 000 80 7
4340 Printing Publishing 133 300 1 000 233 3
TOTAL CONTRACTUAL SERVICES 39 132 44 000 51 400 16 8
TOTAL LAKE ANN PARK OPERATIONS 63 743 71 800 74 300 3 5
29
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1550 Park Maintenance
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 409 215 422 800 435 400 3 0
4011 Overtime Reg 6 600 8 000 8 000 0 0
4020 Salaries Wages Temp 79 339 79 000 82 000 3 8
4021 Overtime Temp 1 094 3 000 3 000 0 0
4030 Contributions Retirement 60 628 58 800 61 700 4 9
4040 Contributions Insurance 64 125 71 000 68 600 3 4
4050 Workers Compensation 11 460 9 500 11 500 21 1
TOTAL PERSmJAL SERVICES 632460 652 100 670 200 2 8
4120 Supplies Equipment 32 762 32 000 32 000 0 0
4140 Supplies V ehicles 6 237 8 000 8 000 0 0
4150 Maintenance Materials 35 976 33 000 33 000 0 0
4151 Irrigation Materials 2 604 3 000 3 000 0 0
4240 Uniforms Clothing 1 344 2 800 2 800 0 0
4260 Small Tools Equipment 804 2 500 2 500 0 0
TOTAL MATERIALS SUPPLIES 79 727 81 300 81 300 0 0
4300 Fees Services 20455 18 000 22 000 22 2
4310 Telephone 3604 3 700 3 700 0 0
4320 Utilities 6952 6 000 6 000 0 0
4340 Printing Publishing 203 400 400 0 0
4350 Cleaning Waste Removal 5382 9 000 6 000 33 3
4360 Subscriptions Memberships 588 400 400 0 0
4370 Travel Training 563 2 000 2 000 0 0
4400 Rental Land Buildings 26 068 23 500 28 500 21 3
4410 Rental Equipment 4643 2 000 2 000 0 0
4440 License Registration 450 700 700 0 0
4510 Repair Maintenance Building 2 191 3 000 3 000 0 0
4520 Repair Maintenance Vehicles 372 2 500 2 500 0 0
4530 Repair Maintenance Equip 17 016 6 500 6 500 0 0
4531 Repair Maintenance Radios 500 500 0 0
4560 Repair Maintenance Signs 3 795 4 000 4 000 0 0
4933 Sales Tax 83 0 0
TOTAL CONTRACTUAL SERVICES 92 364 82 200 88 200 7 3
4705 Other Equipment 3 956 4 000 4 000 0 0
TOTAL CAPITAL OUTLAY 3 956 4 000 4 000 0 0
TOTAL PARK MAINTENANCE 808 507 819 600 843 700 2 9
30
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1560 Senior Citizens Center
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 25 652 26 900 32 200 19 7
4030 Contributions Retirement 3 503 3 700 4 500 21 6
4040 Contributions Insurance 300 100 0
4050 Workers Compensation 90 200 200 0 0
TOTAL PERSONAL SERVICES 29 246 31 100 36 900 18 6
4120 Supplies Equipment 410 300 300 0 0
4130 Supplies Program 3 143 3 500 4 000 14 3
TOTAL MATERIALS SUPPLIES 3 553 3 800 4 300 13 2
4300 Fees Services 17 570 16 500 18 500 12 1
4340 Printing Publishing 100 100 0 0
4350 Cleaning Waste Removal 200 200 0 0
4360 Subscriptions Memberships 20 100 100 0 0
4370 Travel Training 139 300 300 0 0
4375 Promotional Expense 164 200 200 0 0
4380 Mileage 95 100 100 0 0
TOTAL CONTRACTUAL SERVICES 17 988 17 500 19 500 114
TOTAL SENIOR CITIZENS CENTER 50 787 52 400 60 700 15 8
31
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1600 Recreation Programs
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 81 009 84 600 85 200 0 7
4020 Salaries Wages Temp 35 813 64 300 57 100 11 2
4021 Overtime Temp 354 200 400 100 0
4030 Contributions Retirement 13 635 14 900 12 500 16 1
4040 Contributions Insurance 9906 10 600 10 700 0 9
4050 Workers Compensation 1 157 1 000 1 200 20 0
TOTAL PERSONAL SERVICES 141 875 175 600 167 100 4 8
4120 Supplies Equipment 2 000 2 000 0 0
4130 Supplies Program 13 555 13 100 13 600 3 8
4240 Uniforms Clothing 555 1 500 1 500 0 0
TOTAL MATERIALS SUPPLIES 14 110 16 600 17 100 3 0
4300 Fees Services 45 019 47400 57 200 20 7
4310 Telephone 1 252 3 300 3 200 3 0
4320 Utilities 2 596 2 500 2 800 12 0
4330 Postage 200 200 0 0
4340 Printing Publishing 3 587 4 400 4 400 0 0
4360 Subscriptions Memberships 280 0 0
4370 Travel Training 220 500 500 0 0
4380 Mileage 75 500 500 0 0
4400 Rental Land Buildings 4 096 5 500 6 500 18 2
4410 Rental Equipment 11 291 17 700 18 200 2 8
TOTAL CONTRACTUAL SERVICES 68415 82 000 93 500 14 0
TOTAL RECREATION PROGRAMS 224 400 274 200 277 700 1 3
32
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1700 Self Supporting Programs
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET INC DEC
4010 Salaries Wages Reg 20 252 21 200 21 300 0 5
4020 Salaries Wages Temp 2 882 13 600 8 900 34 6
4030 Contributions Retirement 3 021 3 300 3 100 6 1
4040 Contributions Insurance 2 476 2 600 2 700 3 8
4050 Workers Compensation 106 100 100 0 0
TOTAL PERSONAL SERVICES 28 738 40 800 36 100 11 5
4120 Supplies Equipment 277 600 600 0 0
4130 Supplies Program 7432 8 000 8 100 1 3
TOTAL MATERIALS SUPPLIES 7 709 8 600 8 700 1 2
4300 Fees Services 100 377 82 100 82 700 0 7
TOTAL CONTRACTUAL SERVICES 100 377 82 100 82 700 0 7
TOTAL SELF SUPPORTING PROGRAMS 136 823 131 500 127 500 3 0
33
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www cLchanhassen mn us
e
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Paul Oehme Director of Public Works City Engineer t
J
DATE oOctober222007
SUBJ Well Nos 12 13 Project Nos 08 04 0805 Discuss Proposed
Locations
DISCUSSION
Wells 12 and 13 are recommended to replace the lost well production of Wells 5
and 6 Wells 5 and 6 are in the drift aquifer and were the cause of the lost well
production that was experienced this summer These wells cannot be relied on for
municipal water production anymore The new wells would be Jordan aquifer
producing wells Staff has identified several sites which could be used for these
wells Well Alternate Sites 2 and 4 are the preferred locations as shown on the
attached drawing The water for these wells will be treated at the East Water
Treatment Plant The raw watermain for the wells is proposed to be directionally
drilled to reduce the amount of disturbed areas
Due to the nature and scope of the work the project will be on a tight timeline in
order to have the wells in operation prior to the beginning of 2008 peak irrigation
season
Staff anticipates the following project schedule
Neighborhood Meeting
Complete Final Design Approve Plans and
Specifications and Authorize Ad for Bid
Award Construction Contract
Substantial Completion of Construction
November 2007
December 2007
January 2008
May 2008
Attachment
The City of Chanhassen A growin JifMll t IxiNM a lYWmWIJsliW1IJ1 Wl Y1lg Nlbntn jM QlJJJJii gesses winding trails and beautiful parks A great place to live work and play34
35
NOTICE OF MEETING CHANGE
oW
This is to announce that the regularly scheduled meeting on November 12 falls on
the legal holiday for Veteran s Day Therefore the meeting will be rescheduled to
Tuesday evening November 13 at 7 p m
b
36
r
INVITATION TO HALLOWEEN PARTY oK
With fall upon us the City of Chanhassen in cooperation with our local business community is
proud to announce the fourth and final event in our year round 2007 special event series The
event is the Halloween Party and will be held on Saturday October 27 At this time I invite
all area residents their families and friends to join me at the Chanhassen Recreation Center
for this event Children ages 2 10 are invited to participate with the event runnilllfrom5 30
7 30 p m Activities includechildren s entertainment featuring the The DonB Variety
Show trick or treating hayrides outside weather permitting children s games haunted areas
and refreshments Pre registration is required by Friday October 26 at either City Hall or the
Chanhassen Recreation Center The fee is 4 per child adults are free and covers all
activities
37
CHANHASSEN CITY COUNCIL
WORK SESSION
SEPTEMBER 24, 2007
Mayor Furlong called the work session to order at 5:30 p.m.
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Litsey, Councilwoman
Tjornhom, and Councilman Peterson
COUNCIL MEMBERS ABSENT: Councilwoman Ernst
STAFF PRESENT: Todd Gerhardt, Laurie Hokkanen, Kate Aanenson, Bob Generous, Paul
Oehme, and Todd Hoffman
REVIEW CONCEPT PLAN FOR CITY OWNED PROPERTY AT HIGHWAY 5 AND
WEST 79TH STREET (WATER TREATMENT SITE).
Floyd Calhoun with Floyd Calhoun Companies and Steve Johnson with Landform presented a
concept site plan and renderings for an office building. Mr. Calhoun would like to locate his
corporate headquarters, currently located in Edina, to Chanhassen because he lives in Chaska and
his children attend Chapel Hill Academy. They were looking to receive feedback that they are
on the same page as council with design and layout on the site. Mr. Calhoun explained why the
site works for marketing his business, ingress and egress perspectives and pedestrian elements
that can be incorporated into the corner lot which will be a gateway to the city and his business.
Councilman Peterson asked for clarification on building materials and design elements of the
building, noting he liked the look of the building but had a concern with the "busy-ness" of the
signage. Mayor Furlong asked about the difference in the shape of the building on two different
drawings and what the building will actually look like. Todd Gerhardt suggested different
architectural elements that could be used to break up the sides of the buildings to create interest
on all four sides. Councilwoman Tjornhom asked about the height of the building in relation to
the Park Nicollet and Park and Ride buildings. Todd Gerhardt noted staff's concern with access
to the site, indicating the site was being marketed to office users. Councilwoman Tjornhom
asked about parking lot lighting, building lighting and light spillover to Highway 5. Mayor
Furlong agreed that he wanted to see aesthetics without being distracting to traffic on Highway 5.
Paul Oehme stated staff had concern with the size, level and amount of water elements proposed
on the site. Councilman Peterson asked if the applicant had the capital and funding available and
what the time schedule was for construction and occupancy. Todd Hoffman suggested sidewalk
locations into the site for pedestrian access.
REVIEW DRAFT COMPREHENSIVE PLAN.
Kate Aanenson gave a power point presentation on the Land Use chapter, explaining
development influences and estimates of consumption of land based on the Met Council's
population projections. She reviewed a map showing proposed changes in land use, explaining
these were being done mostly as housekeeping items. Mayor Furlong asked staff to review
individually all 59 parcels proposed to be re-designated. Councilman Peterson asked staff to
38
City Council Work Session - September 24, 2007
2
clarify the reason it appears the city is moving away from residential low density. Mayor
Furlong suggested staff keep the dual guiding as opposed to single guiding which would allow
for more flexibility. Councilman Peterson asked for clarification on where commercial and
community neighborhood commercial will be located, stating he was struggling with "sacrificing
jobs for retail growth". Mayor Furlong stated the council needs to think about as the city grows,
and the downtown area is basically fully developed, if the council wants the citizens of
Chanhassen to drive for their needs or keep them in the city.
The work session was recessed at 7:00 p.m.. It was reconvened at 9:05 p.m..
The council continued to review the individual land use changes being proposed in the
comprehensive plan update. Councilman Litsey asked for clarification on the difference between
residential large lot and low density. Councilwoman Tjornhom asked if the affected property
owners had been notified of the proposed changes to zoning. Kate Aanenson reviewed the
changes made in the entire Land Use Chapter and outlined the public hearing process and how
citizen concerns and comments will be addressed by staff. Paul Oehme presented a power point
presentation on the Sewer and Water Chapter of the comprehensive plan update which shows
future extensions to the municipal services and the capital improvements needed to address those
improvements until 2030 with MUSA phasing happening in 2010, 2015 and 2020. Councilman
Peterson asked if the two water treatment plants will be sufficient to address demand in 2020.
Paul Oehme stated they would but the city needs to look for additional locations for water towers
and wells. Kate Aanenson reiterated that the public hearing process will begin October 2nd at the
Planning Commission meeting and the procedure for review that will occur over the next 6
months.
REVIEW ENTRY MONUMENT FOR THE CHANHASSEN PIONEER CEMETERY.
Todd Gerhardt showed a rendering of the proposed entry monument for Pioneer Cemetery,
noting funds are available in the budget for construction this year. Councilman Peterson asked
for justification to spending $30,000 for a sign. Mayor Furlong asked for options to lower the
cost. Councilwoman Tjornhom asked if the work could be done in-house as a cost saving
measure. Councilman Peterson commented that he felt $6,000 was too high for the architectural
design costs. Mayor Furlong suggested taking the landscaping element out of the plan. Todd
Gerhardt stated staff would bring back a bid package with alternatives at the next meeting for the
council to itemize.
Mayor Furlong adjourned the work session meeting at 10:30 p.m.
Submitted by Todd Gerhardt
City Manager
Prepared by Nann Opheim
39
CHANHASSEN CITY COUNCIL
REGULAR MEETING
SUMMARY MINUTES
SEPTEMBER 24, 2007
Mayor Furlong called the meeting to order at 7:05 p.m.. The meeting was opened with the
Pledge to the Flag.
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Litsey, Councilwoman
Tjornhom, and Councilman Peterson
COUNCIL MEMBERS ABSENT: Councilwoman Ernst
STAFF PRESENT: Todd Gerhardt, Roger Knutson, Laurie Hokkanen, Kate Aanenson, Bob
Generous, Paul Oehme, and Todd Hoffman
PUBLIC PRESENT FOR ALL ITEMS:
Kathleen Thomas Planning Commission
Julie Nelson 2165 Murray Hill Court
Ken Larson 7615 Iroquois Avenue
PUBLIC ANNOUNCEMENTS: Mayor Furlong announced the cancellation of the October 8,
2007 City Council meeting due to lack of items on the agenda.
CONSENT AGENDA: Councilman Litsey moved, Councilman Peterson seconded to
approve the following consent agenda items pursuant to the City Manager's
recommendations:
a. Approval of Minutes:
-City Council Work Session Minutes dated September 10, 2007
-City Council Verbatim & Summary Minutes dated September 10, 2007
Receive Commission Minutes:
-Planning Commission Verbatim & Summary Minutes dated September 4, 2007
-Planning Commission Verbatim & Summary Minutes dated September 18, 2007
-Park and Recreation Commission Verbatim & Summary Minutes dated August 28, 2007
b. Resolution #2007-56: Goers Culvert Project 07-13: Award Contract.
c. Resolution #2007-57: Highcrest Meadows 1st, 2nd, and 3rd Additions: Accept Streets
and Utilities.
d. Resolution #2007-58: 2008 Street Rehabilitation Project 08-01: Award Consultant
Contract, Authorize Feasibility Study.
40
City Council Summary - September 24, 2007
e. Approve Joint Powers Agreement with SWCTC for TH 5 Corridor Scoping, Analysis,
Preliminary Design and Environmental Screening.
f. TH 101 Street Name Change, Project 04-06.
g. Neil Klingelhutz, Planning Case 07-16: Request for an Interim Use Permit to Import
Approximately 43,250 cubic yards of Fill from the Highway 312 Corridor for Grading on
Property Located at 8601 Great Plains Boulevard.
h. Power Systems Building Expansion, 8325 Commerce Drive, Applicant: Power Systems,
Planning Case 07-21: Request for Site Plan Approval for a 12,300 Square Foot
Expansion to a 27,800 Square Foot Building.
i. Audio Visual Equipment: Approve Modification to Capital Improvement Program and
Award of Bid. (Mayor Furlong abstained from the vote on this item.)
j. Approval of Release of Land from Contract for Private Redevelopment and Assessment
Agreement; Lot 2, Block 2, Arboretum Business Park 2nd Addition; Arboretum III
Realty Partners LLP.
k. Adoption of Ordinances Amending City Code: Chapter 7, Buildings and Building
Regulations; Chapter 18, Subdivisions; and Chapter 20, Zoning. Chapter 1, General
Provisions (Definitions) was Tabled.
l. Resolution #2007- 59: Lake Riley Woods Channel Project: Approve Plans &
Specifications and Authorize Advertising for Bids for Restoration and Stabilization
Project.
m. Approval of Mayor's Travel to Madison, Mississippi to Participate in Community Forum.
All voted in favor and the motion carried unanimously with a vote of 4 to 0.
VISITORS PRESENTATIONS: None.
LAW ENFORCEMENT/FIRE DEPARTMENT. Chief Greg Geske presented the monthly
update for the Fire Department, reminding council members of Fire Prevention Week activities
and the Open House scheduled for Sunday, October 14th. In response to a personal injury car
accident he reminded everybody of the importance of wearing seat belts. Sgt. Peter Anderley
was not present.
CONSIDER APPEALS OF WETLAND EXEMPTION DETERMINATIONS, LOCATED
AT THE SOUTHWEST CORNER OF LYMAN BOULEVARD AND POWERS
BOULEVARD, JEFF FOX AND RICHARD DORSEY.
2
41
City Council Summary - September 24, 2007
Public Present:
Name Address
Brad Wozney BWSR, 520 Lafayette Road No, St. Paul
Jeff Fox 5270 Howard Point Road, Excelsior
Rick Dorsey 1551 Lyman Boulevard
Kate Aanenson provided an update on the information requested from council members at the
previous meeting when this item was tabled. Councilman Peterson and Mayor Furlong asked the
applicants and staff to clarify the size, location and type of wetland classifications and
clarification of the exemption standards. After comments and discussion by council the
following motion was made.
Councilwoman Tjornhom moved, Councilman Litsey seconded that the City Council
upholds staff's decision on all five (5) exemptions, and affirms the Findings of the Technical
Evaluation Panel (TEP) with the exception that the 10 year deed restriction is no longer
required. All voted in favor, except Councilman Peterson who opposed, and the motion
carried with a vote of 3 to 1.
PAPEDIS VARIANCE, 2101 PINEHURST DRIVE, APPLICANT: SOUTHVIEW
DESIGN, PLANNING CASE 07-19: REQUEST FOR VARIANCE TO HARD SURFACE
COVERAGE.
Public Present:
Name Address
Chris Moehrl 7699 Anagram Drive, Eden Prairie
Tim Johnson 1875 E. 50th Street, Inver Grove Heights
Brian Wisdorf 2997 Hilltop Drive, Chaska
Ojars Papedis 2101 Pinehurst Drive
Jackie Holien 2101 Pinehurst Drive
Bob Generous presented the staff report and update from the Planning Commission meeting.
Councilwoman Tjornhom asked for clarification on what has been done historically with
retaining walls in hard surface coverage calculations. Mayor Furlong asked if staff expects other
variance requests from this development. Staff indicated that there others. Tim Johnson, the
contractor working for the applicant, provided background information on the variance request.
Brian Wisdorf, attorney for the applicant, touched on the issues of precedence and that a variance
gives an applicant permission to depart from the literal enforcement of the zoning ordinance and
that strict enforcement of this 25% hard surface coverage requirement would create an undue
hardship with regards to his reasonable use. Chris Moehrl with Westwood Professional Services
discussed the use of dry wells to help with the runoff situation. Ojars Papedis noted that as the
owner of this property he has no desire to break the ordinance or have the ordinance changed but
with the help of Southview and the professionals believes they've come up with a plan that
3
42
City Council Summary - September 24, 2007
4
would meet the spirit of the ordinance, which is to limit runoff, and still have the ability to enjoy
his fine house. After discussion, clarification of the request and comments, the following
motion was made.
Councilwoman Tjornhom moved, Councilman Litsey seconded that the City Council
denies Variance #07-19 for a 3.3% hard surface coverage variance from the 25%
maximum hard surface coverage for the addition of hardscape in Pinehurst 2nd Addition
based on the findings of fact in the staff report with the following condition:
1. The hard surface coverage of the site shall not exceed 25%.
All voted in favor and the motion carried unanimously with a vote of 4 to 0.
COUNCIL PRESENTATIONS: None.
ADMINISTRATIVE PRESENTATIONS: Todd Gerhardt provided an update on the deeds
received from MnDot for the southern fire station property.
Councilman Peterson clarified that in the last staff report is was stated that it is the developer and
real estate agent's duty to inform perspective homeowners. For the future, he asked that it be
noted that it is not the real estate agent's duty to inform from a legal perspective. Mayor Furlong
pointed out that on the consent agenda a joint powers agreement for the scoping study for
Highway 5 from Highway 41 west through the cities of Victoria and Waconia and out to
Norwood-Young America was approved and the impact that will have on the city of Chanhassen.
CORRESPONDENCE DISCUSSION. Mayor Furlong thanked staff for putting together and
researching the request from the last City Council meeting regarding the Preserve development.
Councilman Litsey moved, Councilwoman Tjornhom seconded to adjourn the meeting. All
voted in favor and the motion carried unanimously with a vote of 4 to 0. The City Council
meeting was adjourned at 8:55 p.m..
Submitted by Todd Gerhardt
City Manager
Prepared by Nann Opheim
43
CHANHASSEN CITY COUNCIL
REGULAR MEETING
SEPTEMBER 24, 2007
Mayor Furlong called the meeting to order at 7:05 p.m. The meeting was opened with the
Pledge to the Flag.
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Litsey, Councilwoman
Tjornhom, and Councilman Peterson
COUNCIL MEMBERS ABSENT: Councilwoman Ernst
STAFF PRESENT: Todd Gerhardt, Roger Knutson, Laurie Hokkanen, Kate Aanenson, Bob
Generous, Paul Oehme, and Todd Hoffman
PUBLIC PRESENT FOR ALL ITEMS:
Kathleen Thomas Planning Commission
Julie Nelson 2165 Murray Hill Court
Ken Larson 7615 Iroquois Avenue
PUBLIC ANNOUNCEMENTS:
Mayor Furlong: Thank you and good evening and welcome to those here in the council
chambers and those watching at home as well. We're glad that you joined us. At this time,
without objection we'll proceed with the agendas that were distributed with the packet. The first
thing I'd like to do is just make a quick public announcement. Due to lack of agenda items, the
regularly scheduled October 8th City Council meeting will be cancelled and we will resume our
regular schedule on Monday, October 22nd. With that I'd like to move to our consent agenda.
CONSENT AGENDA:
Mayor Furlong: So at this time I would ask if there are any items that people would like to
separately discuss or pull off the consent agenda. Anybody? The one thing I'd like to do, I had
some questions with city staff for item (k) which is adoption of ordinances. Would like to, I'm
comfortable going forward with the Chapter 1, Chapter 7. I believe that's right in Chapter 18. I'd
like to pull off the item relating to accessory structures in Chapter 20.
Kate Aanenson: That's correct Mayor.
Mayor Furlong: Or I'm sorry, Chapter 1.
Kate Aanenson: Chapter 1 we wanted to change yeah, well for the definition of indoor air.
Mayor Furlong: So go forward with Chapter 7, which was dealing with the escrow funds and go
forward with Chapter 18 which dealt with the change of trees. Go forward with Chapter 20 with
44
City Council Meeting - September 24, 2007
regard to signage, but to table, bring back for further discussion, staff wanted to look into some
things. Talk to people…with regard to accessory buildings.
Kate Aanenson: Right, regarding the Right to Breathe issues.
Mayor Furlong: So if that's okay with everybody we'll approve that as a part of that motion to
table those portions and include the others as part of our motion. Is that any objections to that?
Okay. As well just for clarification, my vote on item (i) will be an abstention. With that if
there's nothing else, is there a motion to adopt the consent agenda items (a) through (m) with
those items so noted.
Councilman Litsey: Motion to approve as so noted.
Mayor Furlong: Thank you. Is there a second?
Councilman Peterson: Second.
Councilman Litsey moved, Councilman Peterson seconded to approve the following
consent agenda items pursuant to the City Manager's recommendations:
a. Approval of Minutes:
-City Council Work Session Minutes dated September 10, 2007
-City Council Verbatim & Summary Minutes dated September 10, 2007
Receive Commission Minutes:
-Planning Commission Verbatim & Summary Minutes dated September 4, 2007
-Planning Commission Verbatim & Summary Minutes dated September 18, 2007
-Park and Recreation Commission Verbatim & Summary Minutes dated August 28, 2007
b. Resolution #2007-56: Goers Culvert Project 07-13: Award Contract.
c. Resolution #2007-57: Highcrest Meadows 1st, 2nd, and 3rd Additions: Accept Streets
and Utilities.
d. Resolution #2007-58: 2008 Street Rehabilitation Project 08-01: Award Consultant
Contract, Authorize Feasibility Study.
e. Approve Joint Powers Agreement with SWCTC for TH 5 Corridor Scoping, Analysis,
Preliminary Design and Environmental Screening.
f. TH 101 Street Name Change, Project 04-06.
g. Neil Klingelhutz, Planning Case 07-16: Request for an Interim Use Permit to Import
Approximately 43,250 cubic yards of Fill from the Highway 312 Corridor for Grading on
Property Located at 8601 Great Plains Boulevard.
2
45
City Council Meeting - September 24, 2007
h. Power Systems Building Expansion, 8325 Commerce Drive, Applicant: Power Systems,
Planning Case 07-21: Request for Site Plan Approval for a 12,300 Square Foot
Expansion to a 27,800 Square Foot Building.
i. Audio Visual Equipment: Approve Modification to Capital Improvement Program and
Award of Bid. (Mayor Furlong abstained from the vote on this item.)
j. Approval of Release of Land from Contract for Private Redevelopment and Assessment
Agreement; Lot 2, Block 2, Arboretum Business Park 2nd Addition; Arboretum III
Realty Partners LLP.
k. Adoption of Ordinances Amending City Code: Chapter 7, Buildings and Building
Regulations; Chapter 18, Subdivisions; and Chapter 20, Zoning. Chapter 1, General
Provisions (Definitions) was Tabled.
l. Resolution #2007- 59: Lake Riley Woods Channel Project: Approve Plans &
Specifications and Authorize Advertising for Bids for Restoration and Stabilization
Project.
m. Approval of Mayor's Travel to Madison, Mississippi to Participate in Community Forum.
All voted in favor and the motion carried unanimously with a vote of 4 to 0.
VISITORS PRESENTATIONS: None.
LAW ENFORCEMENT/FIRE DEPARTMENT.
Mayor Furlong: I was informed before the meeting that Sergeant Anderley was unable to be
here this evening due to a personal commitment but nothing has changed from his report. I don't
know if anybody has any questions for him that we can work through the city manager. If not,
we'll look forward to welcoming Sergeant Anderley at a future meeting. Chief Geske is here
though however. Good evening Chief.
Chief Greg Geske: Good evening. I was hoping when you mentioned that you're cancelling the
October 8th council meeting, that was because of Fire Prevention Week. …let's say it's because
of Fire Prevention.
Mayor Furlong: That's fine.
Chief Greg Geske: I would like to announce our open house for fire prevention. We have an
open house on Sunday, October 14th from 1:00 to 4:00. We always have plenty of food there.
Lots of demonstrations from extrication and cutting cars apart to the dive demonstrations. All
the sheriff's department is usually there. The mounted posse with the horse and such. Lots of
education. Things from NSP and Xcel Energy and the ever famous fire truck rides are there and
we'll have our new truck there featuring this year too for rides. Last month was a fairly unbusy
month for us again so that's good to report. I would like to talk a little bit about a call that we
3
46
City Council Meeting - September 24, 2007
responded to last Saturday here. It was a two car personal injury accident and a lot of times we
go to the accidents and we see you know where somebody maybe perished and they might not
have because of seat belt use. Had they been using seat belts and this one really showed, it was a
head on accident and when we got the page out that the car was also engulfed in flames so, you
know in responding to that we don't know if the people got out until we got there and luckily
enough everybody had seat belts on. They were deployed. They had small minor injuries.
Some seat belt rash and stuff but it really showed how effective seat belts are and air bags and
that because it was a head on injury accident and everybody was able to get out of the car,
especially before it burst into flames. So I guess if you look for a good ending to that accident, it
really showed what seat belts and air bags can do so I just wanted to pass that on. It good to see
those results out there in our streets and stuff. And that's about all I have.
Mayor Furlong: Okay, thank you. Any questions for the chief at this time? No? Very good,
thank you.
Chief Greg Geske: See you at the open house.
CONSIDER APPEALS OF WETLAND EXEMPTION DETERMINATIONS, LOCATED
AT THE SOUTHWEST CORNER OF LYMAN BOULEVARD AND POWERS
BOULEVARD, JEFF FOX AND RICHARD DORSEY.
Public Present:
Name Address
Brad Wozney BWSR, 520 Lafayette Road No, St. Paul
Jeff Fox 5270 Howard Point Road, Excelsior
Rick Dorsey 1551 Lyman Boulevard
Kate Aanenson: Thank you Mayor, members of the City Council. This item appeared before
you on August 22nd where you held a public hearing and appealing staff's decision on the
Dorsey/Fox wetland exemptions. Just to remind you where they are. This is Lyman Boulevard
and Powers Boulevard future extension of Powers Boulevard here. Those two properties, Jeff
and Terry Fox and the Fox Family. So the applicant, along with Rick Dorsey provided a booklet
at that meeting summarizing their position of appeal. That booklet was dated on the 24th and that
was also accepted as part of the evidence. The City Council held a public hearing and tabled
action so we could review the information that we received. The applicant did grant an
extension for October 1st. This would be the last meeting before that extension. And they also,
council also offered them the opportunity to provide any written arguments. We did receive
some but it was prior to, or excuse me, after the packet went out and I believe the council did
receive copies of those. In summary, or excuse me, I just want to make sure prior to that, so we
did receive all the arguments. This is a summary of the testimony which you have in front of
you which includes the minutes, the Findings of Fact and the summary of the staff report itself.
Summation of. That's kind of the…points we had before you. So there's really two issues to
decide. One, are the exemption standards applied correctly and two, is the interpretation of the
10 year deed recording. Again the city attorney has…that we're going forward with applying the
4
47
City Council Meeting - September 24, 2007
10 year…exemption from that. So there's two, in summary the two points then are the, whether
the crop was annually seeded and the definition of the hay not being considered the grass or…
prior to 1991. So therefore we don't believe it was annually seeded. There's obviously a
difference of interpretation there. The other is based on the type and the size of that. Again
based on the TEP panel review of the staff, that we have determined that it be a Type III with a
Type II fringe, over 2 acres in size. Therefore the wetland exemption would not be permitted.
So in summary the staff is making the recommendation that the City Council adopt the following
motion. The City Council uphold the staff decision on all five exemptions and affirms the
Findings of Fact of the Technical Panel evaluation with the exception from the 10 year deed
restriction is no longer required. So I'd be happy to answer any questions that you may have.
Mayor Furlong: Thank you. Are there any questions for staff at this point? No? Okay. Why
don't we, we had a chance to receive public comment last week, or excuse me at the prior
meeting and some additional information. I guess maybe to start with just, let's clarify any
questions that we have of either the applicant or staff to try to make sure that we get the
information we need as well. Anybody have any questions they wanted to ask of staff or the
applicants? Or points of clarification.
Councilman Peterson: Mr. Mayor I do. I'm trying to go back to my 827, part of what I'm
struggling with is there's so many moving parts to this thing and this is one negative of having a
PC versus paper is that my thumb gets sore from spinning here. But one of the things that I had
on, and it was really more for the applicant, or applicants in this case. Is if you look at Basin 1.
And one of the, I'm trying to ascertain why in Basin 1, and this is probably for Mr. Fox more
than anything else. From their Bonestroo information, they're saying that that main standing
water area, I think it's Type II. This is by memory now because I still haven't found it and the
outlying area is Type I. On the Dorsey side of that picture, that was annually seeded with crop
and I'm trying to figure out why the same type of wetland, why wasn't the Fox side annually
seeded or done something with. So that's one question and staff you can't answer that so
probably the applicant. And maybe I'll pause and have them come up. Is that appropriate Mr.
Mayor?
Mayor Furlong: That's fine.
Kate Aanenson: I think the question was to Jeff wasn't it?
Councilman Peterson: Yeah probably. You understand the question Jeff?
Jeff Fox: There was, in the basin, our Type I basin in the earlier years it was planted but as the
ditch, the culvert got clogged and the area got clogged.
Councilman Peterson: Can you point that out and just kind of. Let me follow this for a second.
The DNR, the Bonestroo drawing of the 3.2 acres and the .8, let's work off of that and that's what
I was trying to find in here.
Mayor Furlong: 289, but the pdf 27. I think it's a Bonestroo picture.
5
48
City Council Meeting - September 24, 2007
Councilman Peterson: No.
Jeff Fox: That one?
Councilman Peterson: Yes, I said no to the mayor.
Mayor Furlong: That's your only time. You get one a meeting.
Councilman Peterson: I can't tell. That's the one with the lines around it? Yeah that's it.
Rick Dorsey: There's another one. This is…
Councilman Peterson: The drawings are not…
Rick Dorsey: I think I can answer your question though.
Kate Aanenson: Yeah, can you?
Rick Dorsey: Yeah. My name's Rick Dorsey, 1551 Lyman Boulevard. What you're looking at
is the information being provided to you dealing with two different time periods number one.
The Bonestroo summary for mine because it's Exemption 1(a) deals with the status prior to 1991.
The application for the Fox parcel is 1(d) Exemption which is dealing with after 1991. So he's
dealing present day so that's what the Bonestroo presentation and the application is his based on
current situation. He didn't farm it or didn't apply for the application as having farmed it prior to
1991 because he didn't own the property. Doesn't know the history of it and so he applied for it
as a 1(d) Exemption. Again the difference, mine prior to 1991 had already been drain tiled and
excavated. His had not. Outside of the ditch.
Councilman Peterson: Okay.
Rick Dorsey: However I can show you a photo that gives you that time period because I had
also farmed that property myself and we farmed it, you can see right through the ditches. That
picture taken in 1983.
Councilwoman Tjornhom: And that's with it being drain tiled?
Rick Dorsey: This is the Fox parcel here. This is a ditch across and then provided, originally the
property was owned by the Jeurissen family. John and Alvin Jeurissen and his family property
sold so what is now the Fox property was I believe a brother of the Jeurissen on my property and
my property drain tiled on his brother's property or cousin, however the relationship was. They
ditched across the property to drain the water does come in across what is on my property. That
was back in the 1960's that that happened.
Councilman Peterson: On what page did you think it was I'm looking for?
6
49
City Council Meeting - September 24, 2007
Mayor Furlong: 289. On the… I believe it's Bonestroo. This is in the electronic version of our
827 packet.
Councilman Peterson: I've got it. I was looking at this week's.
Mayor Furlong: So Mr. Dorsey, that picture there, help us understand how that relates to the
aerial views in the pictures then. What are we looking at?
Rick Dorsey: This is on the Fox property. So from the standpoint of this area, this area in here
is where that picture is looking at. From this direction. It's a little, as you can see right here, a
little clump of trees that would be this house right here. Actually a little shack.
Mayor Furlong: So that would be. What direction is that picture facing?
Rick Dorsey: Looking to the west. On the east side of the Fox property. Again on the Fox
property we're not looking at the historical time period. Just so you know that. But with, to
answer his question why are we looking at it differently and why currently did the Bonestroo
discussion show his as, I believe is the question, the type of typing that was there in the
application.
Mayor Furlong: Councilman Peterson?
Councilman Peterson: Well those are my questions. I've got to process that a little bit.
Mayor Furlong: Question for staff on the, just to clarify. The reason that, and the issues we're
looking at of the 5 applied for, just to clarify versus Basin 1 which includes both one on the
Dorsey property and the Fox request. And the second is Basin 3 which is up along the
northwestern corner of the Dorsey property, is that correct? Those are the two under appeal?
Kate Aanenson: Yes, and if you look on the summary of your…go through which ones we
agreed to…
Mayor Furlong: So Basin 2 and 4 were agreed to?
Kate Aanenson: Yes.
Mayor Furlong: And Basin 2's in the middle.
Kate Aanenson: This one here.
Mayor Furlong: Okay.
Kate Aanenson: So really again simply, since then we've gone back to the issues, are the
exemption standards applied. Being applied correctly and that would be the interpretation of the
annual seeding. And then the type of wetland.
7
50
City Council Meeting - September 24, 2007
Mayor Furlong: And let's talk for a minute about wetland typing because there seems to be a
disagreement between the Bonestroo, and now again maybe that's current versus the historical
but can you give us a little bit of information on how it was typed. What the method that was
used.
Kate Aanenson: Sure, because I didn't walk the site. I'd leave it up to somebody else, either the
attorney or to someone from, maybe Brad who was on the TEP panel to address that. If that's
okay.
Roger Knutson: Mayor if I could just make a quick comment on the Fox basin I'll call it. If you
look at the proposed finding 13, the essential finding there is it's more than 2 acres in size. The
question whether you want to call it Type II, Type III, what have you, it's the size.
Mayor Furlong: And on that issue is it the, Mr. Knutson, is the size of the wetland irregardless
of the size of wetland on the parcel?
Roger Knutson: That's correct mayor. So it's the size of the basin, not how much of it you own.
Mayor Furlong: Okay, so the fact that the property line goes down the middle of this.
Roger Knutson: Doesn't matter.
Councilwoman Tjornhom: A wetland doesn't have a boundary then is what you're saying?
Roger Knutson: Well it's delineated but the basin, the size of it isn't based on how much of it's
on your property.
Rick Dorsey: I'd like to respond to that. I believe it says it's 2 acres of Type II wetlands. Any
amount of Type I wetland for Exemption 1(d).
Roger Knutson: The finding is it's over 2 acres.
Rick Dorsey: In total, and what I'm saying is, Exemption 1(d) is acceptable if there, for any
amount of Type I wetland and up to 2 acres of Type II.
Mayor Furlong: The staff interpretation was that it was a Type III with a fringe of Type II, is
that correct?
Kate Aanenson: That's correct.
Mayor Furlong: What was that, Finding 13?
Kate Aanenson: That's off of the cover of the staff report too.
8
51
City Council Meeting - September 24, 2007
Mayor Furlong: So I guess, and maybe I think we have a member of the TEP committee here.
Maybe you could inform us how the typing occurred. How the determination of a Type III and a
Type II occurs.
Councilwoman Tjornhom: Yes, and how many people were involved in the process. People
involved in that process of typing it.
Brad Wozney: Yeah, I wasn't actually out on site. However we had former employee Lori and
also Greg Gaschek of the Soil and Water Conservation District out on site and confirm the type
and I base my recommendation off of their site inspection.
Councilwoman Tjornhom: Does the County, did they have like a general map of all the wetlands
and are they, do they have a type for every wetland already?
Brad Wozney: Not that I'm aware of. But I think the city has an inventory.
Kate Aanenson: Yeah, but they have to be field verified. It's a starting point. You may find one
that wasn't even on the map, correct. Yeah.
Mayor Furlong: Is the typing that was done, the III and the II, was that typing done based upon
what they viewed at the time of the inspection?
Brad Wozney: Yes.
Mayor Furlong: Okay, and so that is different than what the Bonestroo engineer viewed at the
time. Because I think their report showed a Type II and Type I and as Mr. Dorsey said, that
was…
Brad Wozney: Well I think what they're saying is it's the same as it was in '91 when the air
photos are reviewed. The 10 years prior to the…
Mayor Furlong: What I heard Mr. Dorsey say up or down or back to back, that the Bonestroo
report was done as a current point in time. For the typing of Basin 1.
Rick Dorsey: For the Fox application, it was done based on current time and they looked at,
when they looked at the status of the whole basin, they had to look at the whole thing and they
said it was all Type I with the exception of the pond area on my property which was identified as
Type II, and just because there's water there does not mean it's a Type III. It was a man made
pond, number one so what they said is it never could have been a Type III wetland in their
professional perspective.
Mayor Furlong: Right. I'm just trying to clarify the different here that at the same, virtually or
approximately the same time period the committee determined that it was a Type III and Type II
and your engineer determined a Type II and a Type I.
9
52
City Council Meeting - September 24, 2007
Rick Dorsey: Different times of the year, at least the inspection done by the TEP panel was in
March right after we had the big snowfall that melted in a week and the whole area was flooded
because the ground is frozen. But in any case, as I said the typing deals with more than just
water being there. There's no vegetation growing inside the pond area. It is, it was excavated
and it bounces as far as the water level goes from, down 5 feet from where it was last spring right
now.
Mayor Furlong: Okay.
Roger Knutson: Mayor, just to bring it back to I believe the point, the applicant, the application
was for a 1(d) Exemption so the question before you, do they meet the standards of a 1(d)
exemption.
Mayor Furlong: Could you clarify what those standards are?
Roger Knutson: I'll read them to you quickly. The 1(d), a replacement plan for wetlands is not
required for activities in a type I wetland on ag land except for bottomland hardwood type I
wetlands and activities in a type II or type VI wetland that is less than 2 acres in size. That is
what, that is what the application is filed with the city.
Mayor Furlong: And so the, as I understand it based upon Findings of Fact number 13, if I can
find that quickly. This deals with the size of the acreage. In fact there was a Type III with Type
II…
Rick Dorsey: I believe that's defined, I was looking for it here.
Mayor Furlong: Are you answering a question Mr. Dorsey?
Rick Dorsey: Well just a question that you asked when the typing of the wetland was done and
the TEP panel responded to our attorney's response saying that they did not identify the typing
based on their inspection. They utilized aerial photos to look at that map.
Mayor Furlong: Any other questions at this point?
Rick Dorsey: If you want to know where that was, I can tell you exactly what it said. It was on
number 8. It says, I can read it to you. The exhibit was in there. It says dealing with the Fox
property, it says the TEP employees, the best professional judgment, coming through it says.
Well I can't find it.
Mayor Furlong: Okay. If no other questions, thoughts or comments in regard to this. We've got
the issue before us really dealing with the Basin 1 and Basin 3. Basin 1 covers both the, or goes
across the property line between the Fox and Dorsey property basin. 3 is on the Dorsey property.
The question before us is, were the exemption standards applied correctly and with regard to
interpretation of the 10 year deed recording correct. I think with regard to item 2, based on
information provided by our city attorney, the 10 year deed restrictions with regard to Basin 2 or
Basin 4 would be appropriately lifted. Or not supported because of the change. Not because of
10
53
City Council Meeting - September 24, 2007
anything that the TEP panel did right or wrong but because of the change in the law subsequent
to our interpretation. Is that correct Mr. Knutson?
Roger Knutson: That's my opinion Mayor.
Mayor Furlong: Okay, thank you. So with that the question is with regard to the exemption
standards for Basin 1 and Basin 3. Whether or not the panel applied the standards correctly.
Thoughts. Comments.
Councilman Litsey: Well I would just say that I think we've had ample opportunity to hear from
the public, had a public hearing to hear input. Staff's spent a considerable amount of time on this
and I guess I'm prepared to support staff's recommendation. Makes sense to me. We've heard
public comment. We've heard staff's comments and I'm comfortable with what staff's
recommending.
Mayor Furlong: Okay. Other thoughts? Councilwoman Tjornhom.
Councilwoman Tjornhom: I'm kind of leaning towards Councilman Litsey's opinion also. I
think staff put in time. Mr. Dorsey and Fox put time in it. It's hard for me to sit here and
determine this issue. Really I have to put my faith in staff and what they've done is my job you
know best, it's my job I guess is to interpret what staff says and so I also am ready to move
forward and agree with staff.
Mayor Furlong: Councilman Peterson.
Councilman Peterson: This is interesting for a lot of different reasons and I think we've all
struggled with it because it has been a moving target. As it relates to Basin 3, I would concur
with my fellow council people and say that, that that should remain as staff is presenting. What
I'm struggling with is on Basin 1, and we clearly have different perspectives…and there are
different judgments being used and we're talking about judgments based upon timing of a visit.
We're talking about quality of aerials used and you know there is no clear cut quantitative way to
make this decision. It's very much a qualitative decision. So then if I look at Basin 1 and if part
of the pre-requisite of the exemption is that it needs to be re-seeded every year, philosophically
you know you don't re-seed, as I mentioned before, alfalfa fields every year. So now I'm
interpreting what the legislature tried to do. I think they made an error by saying that personally.
The only time you re-seed alfalfa, being, growing up on a farm, still having a farm, is when it
burns out or when it floods out, you don't re-seed. It's almost impossible to re-seed an alfalfa
field just because of the density of the alfalfa. And knowing that most farmers want to plant
absolutely as much as they can of their field, you know I would look at Basin 1, what staff is
considering Type II, I would probably lean towards Type I knowing that whether it was alfalfa or
otherwise, could be or should be, or could be at least planted because I've gotten my tires stuck
close to wet farmland more times than my father would like me to do. So I think there's an
innate you know need to plant and farm as much as possible as you can. So what I'm struggling
with is you know my, I think it's going to come down to discretion. I'd say that what is now a
Type III in Basin 1 where the pond is, I'm guessing and speculating and probably lean towards
saying that that should remain a Manage 3 area and the area around it is not, not a Manage 2 but
11
54
City Council Meeting - September 24, 2007
a Manage 1 or perhaps not a wetland at all. So I don't know if council can even go somewhere,
can we make a recommendation to go somewhere inbetween? Or is it a linear decision that we
have to make? We either have to accept or reject the decision that's in front of us or can we
further interpret and make our recommendation? You understand the question?
Roger Knutson: Mayor, members of the council. First, you're not making a recommendation as
such. You're making a decision although that decision can be appealed by the Board of Soil and
Water Resources. You're making a decision. Yes, you have the power to make, to draw a line
somewhere different if that's where you think it belongs.
Councilman Peterson: I mean to that end, and I go back to that, what Bonestroo did and you've
got like 1.2 acres around what is now the pond that I would say leave that as a Type III and the
remainder would be a Type I. Again that's really based upon the rationale that I share about what
I believe is the motivating factors for most farmers that would plant everything they possibly
can.
Roger Knutson: Mayor again, since you're making a decision. You have to draw a line. If
you're going to say part of it is exempt, part of it is not, you have to specify so we can find in the
ground…
Councilman Peterson: Well the picture I'm looking at has got a line drawn.
Roger Knutson: Okay.
Councilman Peterson: And that is on page 289 of 827, the appeal meeting. The finding is 1.2
acres around that pond. That I don't think is exempt and I think the remainder would be exempt
would be my personal opinion.
Mayor Furlong: Any thoughts or comments on Councilman Peterson's?
Councilman Litsey: Well deferring to staff because this is a highly technical issue. There's
some, obviously subject to some interpretation and I trust staff has done, acted prudent in the
situation. Done their homework and there is an appeals process to our decision so if in fact the
applicant feels strongly they can bring it to another body to take a look at it, but I personally
don't feel comfortable making any, or actually any changes at this point. I would just as soon go
with what the staff recommended.
Councilwoman Tjornhom: Yeah, I can only to that, while I am certainly sympathetic to the
Dorsey's and Fox's, and I understand where Craig is coming from, my job tonight is to decide if
the standards were applied correctly to this judgment and I can't, I personally can't start renaming
wetlands and deciding what classification they are and when they were one and when they
weren't one. I'm not qualified to do that. All I, you know I'm here tonight to make sure that the
standards are applied correctly and the judgment itself. That's about as far as I feel comfortable
going.
12
55
City Council Meeting - September 24, 2007
Mayor Furlong: Thank you. Councilman Peterson raises some good issues and some that I've
been looking at as well because earlier tonight we talked about the typing and to that end I think
the, my thoughts are, somebody said there's a lot of information here and there's a lot of
information and we're dealing with different time periods. We're dealing with state statute and
different sections of the statutes and to the extent our objective here as the appeals process is to
examine whether or not the standards were applied correctly. Back to Mr. Peterson's point, the
question is with regard to an interpretation, if the legislature wanted to include the harvesting
along with the seeding. My thought is that perhaps they might have but what they ended up
saying was the annual seeding and crop rotation. As I look at what the panel did, my sense is
and my belief is that they applied proper due diligence. I think we had city, county and state
experts there. There clearly is disagreement with the engineering experts hired by the applicant.
That's not unusual that you would have experts disagreeing on statements of fact and issues of
wetlands and over different time periods which are somewhat in the not, in the distant past. Not
recent past. So I guess as I look at it, you know it was suggested that alfalfa annual harvesting
qualified because that was part of the definition for one of the types of uses, haying I believe or
Mr. Dorsey brought that up. I may have gotten that wrong but the annual seeding and crop
rotation or the annual harvesting met a definition. What I don't know is why the legislature then
didn't use that definition as opposed to using the words that they did which was the annual
seeding and crop rotation. I don't know that. What I can look at or what I'm looking at, because
I think if they had there would be more validity to the applicant's appeal as well as to what's been
said out here. I'm looking at, did the task force apply correctly? I think they focused on the
words that were in the statute. I can't fault them for that. I think they applied proper due
diligence and experts and so there may never be agreement on the application here but in terms
of what staff did, I find myself believing that they applied the proper care and due diligence so.
From what I've seen and all the information provided, I'm supportive of the staff and what they
did and they applied correctly. Is it the right or wrong answer? I think that is still open to
interpretation and views but from that standpoint I think, I don't think that there's any reason that
they didn't apply the proper due diligence or have the appropriate expertise on that panel to
proceed. So I understand your thought process and the basis to move out of it, we'd have to
move out of the statute and the panel was asked to apply the statute so I think from that
standpoint I'm inclined to support what they did as correct so. Other thoughts or comments on
that?
Councilman Peterson: No, I mean I agree, I absolutely agree with all 3 of you but I think staff
has interpreted the statute as it relates to the, to the crop rotation accurately. I just happen to
think that that's you know a flaw in legislation that you know if I have an opportunity to interpret
it and correct it and that's why I share what I did.
Mayor Furlong: No, understand. Fair enough. Thank you. With that, is there any other
discussion? If not there is a motion on page 2 of the staff report and Findings of Facts. Is there a
motion to adopt that with the Findings of Fact or is there a different motion?
Councilwoman Tjornhom: I make a motion that we adopt the staff report with Findings of Fact.
I don't have it in front of me.
13
56
City Council Meeting - September 24, 2007
Mayor Furlong: Okay. It's on page 259 of the pdf, if you want to put that in. The motion reads
the City Council upholds staff's decision on all five exemptions and affirms the Findings of Fact
and Technical Evaluation Panel with the exception of the 10 year deed restriction if no longer
required.
Roger Knutson: And adopt the Findings of Fact presented in your packet.
Mayor Furlong: Thank you.
Rick Dorsey: Can I…? The information you presented as well as our record…
Mayor Furlong: I believe that's all part of the record.
Roger Knutson: Yes.
Mayor Furlong: So is that your motion?
Councilwoman Tjornhom: Yes.
Mayor Furlong: Thank you. Is there a second?
Councilman Litsey: Second.
Mayor Furlong: Made and seconded. Any discussion on the motion?
Councilwoman Tjornhom moved, Councilman Litsey seconded that the City Council
upholds staff's decision on all five (5) exemptions, and affirms the Findings of the Technical
Evaluation Panel (TEP) with the exception that the 10 year deed restriction is no longer
required. All voted in favor, except Councilman Peterson who opposed, and the motion
carried with a vote of 3 to 1.
Mayor Furlong: Okay, thank you everyone.
PAPEDIS VARIANCE, 2101 PINEHURST DRIVE, APPLICANT: SOUTHVIEW
DESIGN, PLANNING CASE 07-19: REQUEST FOR VARIANCE TO HARD SURFACE
COVERAGE.
Public Present:
Name Address
Chris Moehrl 7699 Anagram Drive, Eden Prairie
Tim Johnson 1875 E. 50th Street, Inver Grove Heights
Brian Wisdorf 2997 Hilltop Drive, Chaska
Ojars Papedis 2101 Pinehurst Drive
Jackie Holien 2101 Pinehurst Drive
14
57
City Council Meeting - September 24, 2007
Bob Generous: Thank you Mayor, council members. I handed out tonight the revision to the
staff report. Since the project originally came in, the original review for 7.4% hard surface
coverage. That included the deck. We've now interpreted to just have, the deck had weep holes,
that it was not impervious surface and can allow water through so we reduced is to 5.3%. And
then recently staff has been discussing the idea of eliminating retaining walls from the hard
surface calculation because they really generally tend to improve drainage on a site and so we're
now removing that and so now we're down to 3.3% variance.
Mayor Furlong: I'm sorry I was just looking for my update. Can you, how did we get from the
5.3 to the 3.3?
Bob Generous: Well from 7.4 to the 5.3 was removing the deck which has the weep holes in
them.
Mayor Furlong: Okay, thank you.
Bob Generous: And the manufacturer's say they work. Sometimes it isn't. And then going to
3.3 when we removed retaining walls.
Mayor Furlong: So there are no retaining walls left?
Bob Generous: Well there are retaining walls but we don't use them as calculating for hard
surface coverage because generally they're designed to improve site drainage. They'll hold water
back so that it has time to percolate. Generally they create level areas for water to sit on rather
than the slopes that allow water to rush down them. So the city as part of our review process has
eliminated 787 square feet of hard surface coverage from their request. This property is located
within the Pinehurst development which is north of Lake Lucy Road and west of Galpin
Boulevard. As originally platted there were 43 lots. As part of our review of that development
there's a concern that the house sizes that were going in, were proposed for the development
would infringe upon the hard surface coverage. Lennar Homes came in and then replatted the
subdivision eliminating 2 of the lots and creating slightly larger lots. They were on, in this
location and also on the north. Again because they were aware that as part of their development
they had a specific home price that they were looking at and they wanted to allow for some
expansion on the site for the individual property owners. As part of the building application for
this property the applicant came in with their home, driveway, front walk, and they were at
23.2%. They had an additional 345 square feet for the homeowner to expand into the future.
One day our building inspector was out looking at the neighborhood and he noticed that there
were improvements going on this site. He then went and advised the contractor that for the type
of improvements they were proposing, the pavers and the fire pit and all of that, and retaining
walls, they needed to come in for a zoning permit application, which is something the City
adopted last year to try to forestall or void people having to come in for after the fact variances
for such things as setback or site coverage. When they provided, put their information together
they discovered that they were over the 25% hard surface coverage so instead of applying for the
zoning permit they went immediately to an application for a variance to the hard surface
coverage. All along the development's been aware that hard surface coverage was an issue as
15
58
City Council Meeting - September 24, 2007
part of this project. They replatted to provide for larger areas on the lot. When this came in for
building permit there was an expansion opportunity for the homeowner. They just went over the
maximum that they were allowed and now they're coming in requesting a variance. We believe
that they do have a reasonable opportunity to use this property without the excessive hard surface
coverage on the site. Staff is recommending denial of the variance request. This item went to
the Planning Commission on September 4th. They voted 5 to 1 to deny the variance and so the
applicant is appealing that decision to City Council. I would note that we're recommending
denial of the variance and also we're requesting that you modify the Findings of Fact attached to
your report. Item 4(a) and add the following two sentences. The proposed use is not a
reasonable use of the property. The extra 3 1/2% impervious surface coverage will contribute to
storm water quantity and quality problems. With that I'd be happy any questions.
Mayor Furlong: Questions for staff.
Councilwoman Tjornhom: This isn't really a question regarding this item but getting back to the
retaining walls. Are we going to, is this going to be a standard practice from now on? Or has it
been?
Mayor Furlong: Yeah, what have we done historically?
Kate Aanenson: We hadn't included them in the past recently. Not that we've passed with any
variances with these but I believe that the engineering department wanted to review those as a
part of the impervious surface coverage. Internally we've had some discussions on whether or
not that made sense or not. Especially in the circumstance where you have to put a retaining
wall based on grading. Those sort of things. Sometimes they're decorative. Sometimes they're
put in place, if you wanted to add a third bay garage or need to hold something up, but lots of
times they're put in place in the development itself for rear yard to enjoy a flatter area so looking
at that, based on the 5 we felt, it seemed kind of punitive and they were in place already, or
needed to be put in place to enjoy the back yard, not to include those.
Mayor Furlong: So clarification.
Kate Aanenson: Our ordinance doesn't specify them for the interpretation. So somebody made
that interpretation.
Mayor Furlong: Okay, the ordinance talks about impervious surfaces. Anything that impedes
the flow of storm water.
Kate Aanenson: Right. So the interpretation was that it doesn't. That those do not impede. It's
not the same as a patio or a pavers, those sort of things.
Mayor Furlong: Councilwoman Tjornhom, other questions? My question for staff dealt with
retaining walls because I believe in the past we've seen those as part of the impervious surface
calculation. But you said these are already in place?
16
59
City Council Meeting - September 24, 2007
Kate Aanenson: Correct. If you look under definition it does say any hard coverage. It's one of
those things when somebody comes in, it seems rather onerous, especially in circumstances
where they're required to put them in in order to make the, facilitate the activity that they're
trying to do. Whether it's a sport court or extra garage, and normally it's that extra half a percent
that's getting you under the circumstance, was it a half a percent wasn't it or 1%?
Mayor Furlong: These are 2% over?
Bob Generous: …however again from this site's perspective, the use of the retaining wall
actually slows down water. Provided greater opportunity to percolate into the soil. And that's
generally what we see…where water's sheeting off the property.
Councilman Litsey: It slows it down? Helps it percolate in?
Bob Generous: Yes. Provides a greater opportunity to do that.
Councilman Litsey: Right, okay.
Todd Gerhardt: Mayor, may I ask? This is something I think we're going to have to go back and
do maybe a white paper on or some research on and come back with some different scenarios for
you to take a look at this and somehow get it incorporated into our ordinances and how we're
going to view retaining walls and also maybe take a look and see what other communities do but
in the past I think we've looked at them as impervious. In this situation it looks like it may be
improving the situation but I think we need to sit down as staff to do a little bit more research
and give you a definitive read on how we're going to view retaining walls in the future.
Mayor Furlong: Okay. Okay, thank you. Any other questions for staff? Is this, this
development was approved, the plat was approved how long ago?
Bob Generous: July of 2006.
Mayor Furlong: 2006. So this is the first of a few coming through?
Kate Aanenson: There's another one right behind it.
Mayor Furlong: How, you said in your presentation, the house site itself allowing with the
driveway and sidewalks was about 23%.
Bob Generous: Correct.
Mayor Furlong: A little bit more than 23% hard surface. Are we anticipating similar types of
housing sizes on lots in this neighborhood?
Bob Generous: Yes.
17
60
City Council Meeting - September 24, 2007
Mayor Furlong: Thank you. Okay, any other questions for staff? Is the applicant here?
Representative. Good evening.
Tim Johnson: Good evening. I am Tim Johnson with Southview Design. We are the contractor
that's representing the owner at 2101 Pinehurst Drive. The plan that you see in front of you, just
a brief history. When we came into the Planning Commission a few weeks back, we cooperated
with the city and the building officials and we stopped the actual construction of the work on the
findings that we found out that we were unaware of. Currently the retaining wall, this fire pit,
patio application, the patio here, as well as the front walkway is currently in. We have had plans
of adding another patio space but we decided not to include that at this time. So we've been
working with the City very closely and then I presented now this plan to the Planning
Commission as well as a drainage infiltration system. At that time we were instructed that you
know they were very interested in hearing more about this infiltration system and how it can
actually improve the runoff from the property, but they weren't able to make a decision at the
time for, an educated decision on their part so since then we've been working with an engineer
who will speak on our behalf tonight, as well as a few other individuals. But I would actually
like to turn the rest of our comments over to the Brian Wisdorf who is representing the owner of
2101 Pinehurst.
Brian Wisdorf: Good evening council. My name is Brian Wisdorf. I'm with the firm Severson,
Sheldon, Dougherty and Molenda out of Apple Valley. I've been retained by Ojars Papedis, the
actual owner of the property in question. In hearing the staff's comments tonight, one thing that I
would like to point out about the fact that it's Ojars Papedis that is basically making the
application for the variance and not the developer. The developer's issues with the city, whatever
they might be, should not be, in my mind, considered as part of what knowledge or requirements
that, for part of the evaluation of my client's request for a variance. A couple of things that I
wanted to touch on. A variance gives an applicant permission to depart from the literal
enforcement of the zoning ordinance. Strict enforcement of this 25% hardship surface
requirement would create an undue hardship with regards to his reasonable use, and the reason
I'm addressing this now, even though they have addressed the retaining wall, it seems like there
may be some consideration of still incorporating that in the calculation. I would take the position
on behalf of my client that there is an undue hardship. As the Planning Commission has noted
that the topography of my client's property slopes significantly in the rear yard. 75, or excuse
me, 17.3 feet drop in a matter of 70 feet according to their report. This change in elevation
begins at the rear of the home and without the use of retaining walls to build up the back yard,
besides the impact it will create on drainage, it also allows my client to have reasonable use of
his property. The Planning Commission had recommended denial based upon the staff report,
set forth in the original staff report where they were looking at a 7.4% overage on the hard
surface coverage. They have now changed that based upon their calculations to 3.3. Have no
reason to dispute that recalculation at this point. I do believe that that recalculation was
appropriate. However, this helps address some of the hardship but it also establishes how fluid
the ordinance is, and I believe that the council has acknowledged that to a certain extent. This
same discretion should be considered in applying for determination of whether a variance should
be provided for the remaining 3.3%. When it's taken into consideration…the goal of what the
ordinance is, which I believe is to address storm water quality and quantity. The other issue that
the staff had brought up is their concern with the precedence that this would create if you grant
18
61
City Council Meeting - September 24, 2007
my client a variance in this case. I think that can be, what is going to be presented to you by
Chris Moehrl of Westwood Professional Services is something that would not create a precedent
that went against the underlying policy of the ordinance. When applying the City Council's
discretion which the staff had acknowledged gave you relatively high level of discretion in
providing and allowing a variance, is that the hard surface, hard surface coverage requirement is
typically established to preserve this storm water quality and quantity. The engineer that has
been retained at my client's expense has went through, went out and viewed the property. Came
up with a system to put in place on the property which would not only address the 3.3%, but
bring the amount or the percentage of actual affected runoff from the hard surface down to below
25%. He can go into greater detail as to how this system would be implemented and how he
came up with the numbers he came up with. The only precedence that this variance would create
is that when it is a topographical issue as there is in this case, would create an undue hardship. A
homeowner can have an engineer create a surface water runoff plan that will reduce the surface
runoff from the property to that which would be expected from a property with 25% hard surface
coverage or less. And I'll let Mr. Moehrl go into greater detail as to exactly what kind of system
he is talking about.
Kate Aanenson: Mayor can I just address a couple things really quick about the interpretation?
If that's okay? Regarding percentage. We started off with 7.4% variance. And in good faith,
just so it doesn't appear like we're trying to change our whole position on this, in good faith we
took the interpretation after a lot of contentious negotiations to interpret the patio as having a
space. And that was very difficult conversations to finally get to the 5.3%. As far as the
interpretation of the retaining wall, that could be something you can interpret based on
topography to grant a portion of that for a variance to give that additional 2% to make that, to
make reasonable use of the property if you felt inclined. As far as the additional amount of
pavers we saw no relationship to that based on the topography or the layout of the property itself.
So we weren't trying to go down this slippery slope. We were trying to work with the applicant
and what we felt were some pretty contentious and onerous conversations. So I don't want you
to think that we were just throwing it in and kind of making this, now we're going to end up at
zero tonight kind of discussion. So I wanted to make sure that was clear what we were trying to
accomplish is trying to find some reasonable based on their interpretation of the spacing of the
boards on the deck. And then our interpretation of some reasonable use, if you wanted to make
that a rational basis for your variance. Of the retaining walls.
Mayor Furlong: Okay.
Brian Wisdorf: And just so we're clear, that really wasn’t my contention of, even though it may
have came across that way. My only point was, that the fact that the calculation seems
somewhat fluid, it is my belief that the court or the council should keep in mind that fluidness in
determining whether or not a variance should be granted given their broad discretion and the fact
that what our client, my client is proposing actually goes to the intent of what the ordinances are
put in place to address. Thank you.
Chris Moehrl: Mayor, council members. My name is Chris Moehrl with Westwood Professional
Services, and actually the original engineer on the Pinehurst project so I've got some history with
this job. Tim Johnson had given me a call and kind of explained the situation on the lot and
19
62
City Council Meeting - September 24, 2007
wanted to see if there were some different storm water techniques we can implement to basically
address the overage on the impervious area, seeing that the intent of the code of the 25% is to
maintain drainage so you're not overwhelming downstream facilities and ponds. Our first
approach to the site, what we wanted to do is first of all mimic what a typical lot would be with a
25% coverage. And then in that approach we calculate the runoff from the additional impervious
area and then we calculate that same runoff if it were sod. And that was kind of our first step and
what we wanted to do on this project is be very conservative so instead of taking that difference,
we actually went to the level of infiltrating 100% of the roof drainage that exceeds that 25% and
we added in an additional, oh I think an additional 100 square feet and again this was all before
the change with the retaining walls so the credit in the retaining walls is not taken into account in
the calculations on the…and I'll try not to make this too technical. So in putting together the
whole infiltration concept again what we're trying to do is maintain the downstream storm water
runoff to what it would exist with the 25% coverage building. Part of that, and if we can, can
you zoom in on this a little bit? So this detail right here is basically the underground infiltration
well that we're proposing. Basically what that does is as the additional runoff comes from a roof,
it stores that water underground in a fairly course material. What that does is basically allow that
water time to drain into the in place soils. Over time. As you know one of the questions that
might come up, Chanhassen largely clay soils. Does infiltration make sense? To give you an
idea, the initial guidelines we used are from Carver County. Based on soil type on the site, they
use .23 inches per hour. Typical sand sites you might get infiltration rates in the range of 5 to 10
inches, just to give you a feel for what we're using. Carver County also bases their design on the
average storm event in the metro area of .34 inches, which is also based on that storm occurring
every 3 days. So the combination of those two numbers, you come up with your infiltration rate.
As opposed to using average storm event on this project we actually designed this for the 100
year storm event so again what we wanted to be is very conservative. We want to make sure that
the systems work and really meet the intent of the code. In putting together that number, if you
back calculate that, again 100 year event we use .23 inches. If you run the average storm event
through that, you're actually having an infiltration rate of .013 inches per hour. Again just to
give you an idea of how conservative this is. I also wanted to mention too, in our first approach
where we were just going to mimic the 25% coverage lot, when we went to the more
conservative approach it about doubled the footprint of the infiltration runoff. With that said
again, just another thing to give you an idea of that .013 inches per hour, that's about 17 times
more conservative than Carver County based on that average storm event. And I know staff has
issues with maintenance. How do we maintain these things? Definitely you know it's for
consideration when reviewing these. Not really defined a very conservative approach to the
system. We've also proposed a monitoring well so you can easily go out and just stick a stick in
that well to determine what the water levels are in the system. We also have emergency
overflow pipes so you can physically see hey, there's something clogged up. It's easy to see that
water coming out of the system and that can be addressed. The other issue with maintenance,
how do we, or how does the City enforce that? How do they make that happen? What kind of
assurances can you get from that? My thought is that you could record a legal document that
would give the city legal right to enforce that, which would make the homeowner maintain the
system as it is in place, which would also go with the lots so if this current homeowner were to
sell the lot, that document would reside with the lot and not with the owner, so the next person
that comes to purchase the property, that document would show up during a title search and they
20
63
City Council Meeting - September 24, 2007
would be aware of it. With that, I can open it up to any questions that you guys might have or
concerns that the staff might have. Technical questions.
Mayor Furlong: Any questions for Mr. Moehrl? Thoughts? Okay. How about, thank you.
How about Mr.?
Todd Gerhardt: Mayor, I have a question. Have you used this system anyplace else in the Twin
Cities?
Chris Moehrl: You know I have not personally. Typically what we've seen in Carver County
we're doing large scale infiltration basins and then we'll plant those with vegetation. I see those
as being a bigger maintenance problem. You've got to maintain the vegetation which is a big
part of that. Weed it out. You know in my mind they take probably 2 to 5 years of some care to
really get the vegetation established as it needs to be. I haven't personally done any of these
underground, smaller scale infiltration systems but really when you're talking this kind of
treatment, in my mind they're more effective if they're based on smaller drainage areas. So if
you have one large infiltration basin that maybe requires a lot of maintenance. In lieu of that you
could propose kind of a lot treatment basis. You know more smaller treatment systems and I
think maintenance with those is a lot lower and the chances of those systems failing are lower
too. Plus we also have an underground system so you're not dealing with a lot of vegetation. A
lot of unknowns on you know what is it going to take to get that vegetation going. It's based on
really volume and geometry, well defined…
Todd Gerhardt: Have you thought about the freeze thaw cycle in Minnesota? If this froze over.
Chris Moehrl: Freeze thaw on this, what we've done here is basically the bottom, the bottom of
the basin, to give you an idea is about 4 1/2, 5 feet in the ground, so we're getting down below
that frost depth. Obviously if you had a really cold winter, it's quite possible that that depth is
going to go down here. Might move the rock around a little bit. I don't see that as a big issue,
especially granted that most of your runoff doesn't occur in the middle of winter when you're
going to have your colder temperatures. You know if we were proposing something that was
maybe 2-3 feet in the ground I'd be more concerned with it. But we're getting a little bit deeper
than that. Typically footings on a house, you're going to be down in the neighborhood of 4 feet
to do a lot of those footings. Watermain which is probably the other extreme, you're watermain
is typically underneath the street. That's plowed and most of the cold to get down in the ground
further, those type of things are usually 7 1/2 feet in the ground so. At 5 1/2 feet you know I
think we're in the ballpark.
Todd Gerhardt: That's all I had Mayor.
Mayor Furlong: Thank you. Any other questions at this point?
Councilman Litsey: I just had a quick question on the ordinance. It doesn't allow for this type
credit though does it?
Kate Aanenson: It hasn't…
21
64
City Council Meeting - September 24, 2007
Councilman Litsey: Yeah I know we've had discussions about some of these applications and
how they might be beneficial and how we might apply them as part of the ordinance but as the
ordinance currently exists, that is not in there.
Kate Aanenson: That's correct.
Councilman Litsey: Okay so, I applaud your efforts to try to help with the situation but the
bottom line is, it's not in the ordinance at the present time and therefore in my mind you would
have to stay within the ordinance. And, well I'll go on later but I'll leave it at that.
Mayor Furlong: Okay. Any other questions? Councilwoman Tjornhom, did you have a
question for the applicant or for their attorney?
Councilwoman Tjornhom: I don't, I think a way back when we were looking at the plan, if we
can go back…variance, I can ask the question.
Mayor Furlong: Alright. Okay. I did have one question for the attorney, if I could Mr., was it
Wizard? Wisdorf?
Brian Wisdorf: Wisdorf.
Mayor Furlong: Thank you. Sorry.
Brian Wisdorf: Not a problem.
Mayor Furlong: You talked about the, there is a hardship because strict adherence to the 25%
would not allow reasonable use. Help me understand how you're considering reasonable use of
that, see if I understood you correctly.
Brian Wisdorf: What I was taking from the comments that were brought up before we got up to
present our part was the conversation that had taken place with regards to the staff's calculation
of the overage at this point and I, what I was taking from that was that there may be a concern
with the council with regards to giving credit or not calculating into the hard surface coverage
the retaining walls and my point being, as part of whether or not you grant a variance, part of that
hardship is you look at the, whether to grant a variance, you look at whether or not there's an
undue hardship and I think it's clear, it's been clearly articulated as part of an undue hardship is a
person's ability to use the land in a reasonable manner and what I was saying is with regards to
change in elevation in the back yard to get a reasonable use of a parcel, especially one that's
shaped in the manner that this is, when even beyond the retaining walls that have been built on
this property, there's a vast area of the property which remains unaffected that to prevent the
property owner from maintaining those and keeping those retaining walls in place would create
an undue hardship and therefore if not taking out, if not excluded from the calculation would
create an undue hardship.
Mayor Furlong: Because of the topography and the.
22
65
City Council Meeting - September 24, 2007
Brian Wisdorf: Shape of the lot.
Mayor Furlong: The shape of the lot.
Brian Wisdorf: And it's topography.
Mayor Furlong: And with regards to the shape of the lot.
Brian Wisdorf: My point being that, on the parcel here, the retaining wall goes out to here. It
appears that the property indicated by the exterior line, my point being that change in elevation
start in this area and if you take out the retaining walls, you're going to have an undue hardship
on the property owner which would give rise to a reason to grant the variance if you decided to
leave the retaining walls in the calculation.
Kate Aanenson: Mayor? I was just going to say, well there's two ways to look at it. One, you
could put the retaining wall and meet the requirement but you have to take out all the other stuff.
It's the other stuff that's causing the problem. The patio. The fire pit ring. So even if you're
looking at some of those retaining walls. If you look on page 5 of the staff report, it gives you a
breakdown of all those square footages of what's pushing you over. See the table?
Mayor Furlong: Yes.
Councilman Litsey: But that was one of my questions. What needs to be taken out?
Kate Aanenson: Right, I think that's kind of, you do kind of a menu of what choices that, what's
pushing it over the top.
Councilman Peterson: What page are you on?
Kate Aanenson: It's on page 5 of the staff report.
Mayor Furlong: Well, in the handout?
Kate Aanenson: It's on there too.
Mayor Furlong: There's a revised schedule.
Kate Aanenson: Yes, if you look at that.
Mayor Furlong: And the difference there, just has to do with the upper wall and lower wall?
Kate Aanenson: So if they're at 23.2% right now and you were to add just the retaining walls,
which would be 365, you've be over by 20 square feet. So if you added the retaining walls, plus
or minus eliminating 20 square feet, you would still be at that, just slightly over the 25%. So you
wouldn't need a variance just by putting the retaining walls in, but for 20 feet. 20 square feet.
23
66
City Council Meeting - September 24, 2007
Mayor Furlong: And just to clarify then the table that we're looking at on page 5 as revised and
actually this is consistent. The first 3 items. The house, garage, porch, driveway, front walk.
Kate Aanenson: Right.
Mayor Furlong: Those are the items that were included in the building permit and total 23. how
much percent?
Todd Gerhardt: 2.
Mayor Furlong: And I'm correct in saying those first 3 line items Mr. Generous were part of
the?
Bob Generous: Those were part of the original building permit application.
Mayor Furlong: 23, okay.
Councilman Peterson: How many square feet do they have to eliminate to get down to the 25?
Todd Gerhardt: 195.
Councilwoman Tjornhom: 195?
Todd Gerhardt: 95.
Kate Aanenson: I think it's a little more than that.
Todd Gerhardt: Also 381.
Bob Generous: After the original approval they had 345 square feet of expansion that they could
have done.
Councilman Litsey: Could have done.
Bob Generous: Without a variance.
Mayor Furlong: 345 square feet.
Kate Aanenson: Right.
Mayor Furlong: Plus the original would get you to the 25%.
Kate Aanenson: Correct. So what that allowed you to do is put the retaining walls in, if that was
your choice to use for your hard cover, or to put in a front, the patio paver sidewalk. The other
choices that they selected from.
24
67
City Council Meeting - September 24, 2007
Mayor Furlong: Okay. And again for clarification, if the upper and lower walls were included,
if I'm adding correctly is 365 square feet.
Kate Aanenson: And they had 345.
Mayor Furlong: And they have available 345.
Kate Aanenson: That's correct.
Mayor Furlong: Okay.
Brian Wisdorf: I think that still goes to the issue of whether or not the retaining walls are
necessary in order to avoid an undue hardship. Yes you could include the, from what I'm
understanding you could include the retaining walls and still come under the 25%. It is my
position that with regards to the improvements to the property, any improvement necessary in
order to get the, get use out of the back yard should not be considered in that calculation. That
for to the extent that it is considered in that calculation, that amount of coverage should be
considered as part of the variance because that is what creates the undue hardship. And what my
client is proposing to do, which isn't required to do by ordinance, is to address the two things that
are left on the property that are, create the largest problems and that's the patio and the fire. Let's
see, upper patio and fire pit I believe are probably your two major issues. And what they're
proposing to do would not only alleviate the concern that the ordinance was put in place to
address, but it more than compensates for it.
Mayor Furlong: Okay, thank you.
Councilman Litsey: Well maybe this is too simplistic but at the time this was platted it was
made clear right that there's a 25% maximum hard cover requirement?
Brian Wisdorf: I was not involved with the builder at the time.
Councilman Litsey: Well that's what I asked, in my staff report it's saying that and so now you're
claiming a hardship but yet all along that expectation was made clear from the time it was platted
apparently. And perhaps you're trying to get too much into the size of the lot that it just can't
accommodate that to meet the ordinance. Because some of the other things that are being talked
about doing here are nice and they're you know cutting edge maybe applications and things like
that, but we haven't gotten to the point where we've adopted it in ordinance so, to me it seems
like it goes back to when this was originally platted and it was made clear what the expectation
was and then you have to live with that. I don't know how you can come back later and then
claim a hardship when it was made clear from the onset that this is the requirement.
Brian Wisdorf: Well Mr. Papedis was not involved in the originally platting. His knowledge of
this issue first came to his attention when the inspector came to the site and spoke to the
contractor who then proceeded to inform my client that the issue that's on his property.
25
68
City Council Meeting - September 24, 2007
Councilman Litsey: So would the issue not be then to go back to the contractor and talk
between, have that dialogue rather than here?
Brian Wisdorf: Well that, ultimately my client is the one who owns the property. Just bought
and built a very large and expensive home on the property and doesn't have any intentions on
moving and I don't know to what extent a financial settlement with the builder is going to
alleviate the hardship. I mean obviously that doesn't go to necessarily the issuance of an
ordinance but it still doesn't address the hardship that it would create for my client with regards
to the taking of, for building this size of house, this nice of a house and then not being able to
build a patio off of it seems to be, create somewhat of a hardship for the client as well as the fact
that you know his plan is, as you can see from his plan, to develop the number of trees and plants
he's also planning to plant around his property is all tied into what he's currently got.
Councilman Litsey: Okay, I still think your issue's more with the builder than before this
governing body and I'm sympathetic to what you're saying. Don't get me wrong but I'm not sure
we're the proper authority to resolve it.
Mayor Furlong: Okay. Thank you. Thank you, any other questions for the applicant? Or
anything else from the applicant? Comments?
Ojars Papedis: Council, my name is Ojars Papedis. I am the homeowner. I'm the one who owns
this piece of property and the situation I'm presented with here so if I may express my views as a
new citizen of Chanhassen, coming from Bloomington. I'd also, the aspirations that I have for
this house when I bought it. I think you'll find this to be true with many of the owners in the
Pinehurst development. None of us were told explicitly that there was a 25% hard cover
ordinance in the city of Chanhassen and that the houses that were being put on it, and more
importantly, nearly consumed the entire hard cover issue and when Brian was speaking about
hardships, I don't think we're talking about a hard, black and white hardship. We're talking about
an owner, such as myself and some of the others that are in my neighborhood, who bought so to
speak the house of their dreams and would love to have put reasonable outside conveniences
such as a patio for entertaining and enjoying the property. And I can tell you that when Mr.
Johnson of Southview and I came up with this plan we did not think that we were covering the
entire lot with bricks and pavement and parking spaces. In fact we even went a little less
aggressive than what you see today so. And I personally as a homeowner think that I have no
desire to break the ordinance or have the ordinance change but I do think that with the help of
Southview and the professional over here, we've come up with a plan that would still meet the
spirit of the ordinance which is to limit runoff and still have the ability to enjoy this fine house
that I now own so, that's my point and I think that's the issue that faces myself and the other
homeowners in that particular development. We were very shocked to find that we couldn't do
more than put in a 20 by 20 foot patio. Not for the kind of lots that we have and the houses that
we have.
Mayor Furlong: Thank you.
Ojars Papedis: Thank you.
26
69
City Council Meeting - September 24, 2007
Mayor Furlong: Any questions of the property owner?
Councilman Peterson: I've got a couple more. Not for you sir but for staff probably or the
landscaper. Kate when we, or Bob, when we figured the impervious surface, did you factor in
anything for the stone steppers or is that?
Kate Aanenson: That was added. If you look at the sheet that shows the original survey.
Councilman Peterson: Oh the steppers were on the bottom. That's the stone steppers?
Kate Aanenson: Yeah.
Councilman Peterson: Okay. And then for the landscaper itself, in the areas around the house,
are you using fabric or are you using plastic?
Tim Johnson: We're using neither. We're actually going to be installing a pine bark mulch that's
going to be installed on top of the soil. There's going to be no rock or poly installed on the site at
all. As far as one question of concern that I've had with Angie a couple times is, you know the
stepping stones are individual. There's you know large gaps inbetween it. It's not a pathway. I
mean we're not going to be considering outcroppings but we do consider stepping stones so those
are I guess in gray areas within what needs to be considered. It seems like that can be a little bit
of more of an opinion as far as hardscape stepping stones and individually, they're not touching
each other…you know so it's no rock. No poly so. Can I make one comment? You Todd had
mentioned have we used the system before that Chris has brought up. We're currently nearing an
end of the development in Minnetonka where we've used a similar situation. Actually the depth
of the dry well and infiltration system is much smaller that we're actually installing. It's used for
ground protecting some lower townhomes from the runoff and the drainage from the newer
development homes so this is a system that is being used you know real close by here in the city
of Minnetonka.
Todd Gerhardt: But it hasn't gone through a freeze thaw cycle yet?
Tim Johnson: The development's probably 3 or 4 years old.
Todd Gerhardt: Okay.
Councilman Litsey: And is that to meet their ordinance standards or, here we're talking about
trying to basically give you some credit for that technology. Are they getting credit in
Minnetonka for that technology?
Tim Johnson: That basically is just protecting the lower properties from you know receiving the
amount of runoff from the much larger homes and the townhomes so basically it's doing the
same activity that we're asking it to do by collecting the runoff from the home and you know
allowing that to go into the system.
27
70
City Council Meeting - September 24, 2007
Councilman Litsey: But they're meeting the hard cover, as far as you know they're already
meeting the hard cover surface?
Tim Johnson: Their hard cover in the city of Minnetonka is I believe 30 or 31 percent so they're
much higher percentage than the city of Chanhassen.
Councilman Litsey: Okay, but…my question was they are meeting the ordinance currently
without that system in place?
Tim Johnson: That system that we installed there was more or less just to allow, I'm not sure
how that came into play. I think that was developed through the engineer that actually provided
that system to go in place.
Mayor Furlong: Was that part of the platting of the development or was it for an individual
home?
Tim Johnson: It was, some of the homes on the hillside, like what we have right here, were, our
lots are sitting up much higher. That was put in for those homes that sit above the other.
Mayor Furlong: The developer did that as part of the subdivision of the plat?
Tim Johnson: I believe it was the developer and the city would review that as a whole.
Mayor Furlong: Okay. Thank you. Any other questions for staff or the applicant?
Roger Knutson: Mayor, not to complicate things. Just to comment on.
Mayor Furlong: I'm ready for that.
Roger Knutson: There's several criteria that have to be met for a variance. I'm not going to
address them all. They're addressed in the staff report. I'm just going to address one of them.
One of them is, does the ordinance prevent a reasonable use of the property? Not any reasonable
use but a reasonable use so the question you have to ask is what they want reasonable. When
considering that criteria you can, if you choose to, consider only offsets that the applicant is
offering to reduce the negative aspects of what they're proposing. So in this example, what did
they call them? I'll call them sand pits. If the sand pits reduce, are effective and do reduce
runoff, you can consider that in determining whether, if that were a condition, whether that is a,
helps creates a reasonable use of the property. You're allowed to do that. Again that's just one of
the criteria you have, is something unique about the property and all the other criteria. So you
can factor that in if you choose to, if you find that it's effective.
Mayor Furlong: Okay.
Councilman Litsey: Well I have a question for staff. Are we anticipating other requests for
variances in this development based upon?
28
71
City Council Meeting - September 24, 2007
Kate Aanenson: Yes.
Bob Generous: There's one in the works right now.
Councilman Litsey: And perhaps more. You don't have a crystal ball to tell us that but your
sense is that there will be more. And is that due in part then to the, how this was platted?
Kate Aanenson: Well again, we asked the developer, if you recall we've made a couple changes.
One on these larger homes that put a patio in and they're at, we've had them come in at 24.5,
24.9. We've asked them if they have a patio door, that they have to at minimum, we've amended
the code to say they have to have a minimum, put a 10 by 10 landing pad out there. So that they
have to put a buffer in there. We've had developers try to leave off front sidewalks. Didn't meet
that impervious. We said that's not a reasonable expectation. We did inform, we did mention to
Lennar, we were deeply concerned of how they were platting these lots and the size homes they
were putting on the lot. We've had a lot of negotiations when these plans come in. When they
show them at the maximum, we circle that. Tell them unfortunately that the homeowner doesn't
always look. You know we carefully noted on this, this is towards the top end and there's
expectation of, that they're looking at that when they come in. That the landscaper or whatever's
going to call us to see what they can do.
Mayor Furlong: Any other questions at this point? Other than that, thoughts or comments.
Consider the request here before us.
Councilman Peterson: Mr. Mayor, I'm happy to tackle this one. You know I don't even know
how many years I've been doing this now. I've kind of lost track but it's been 15 or 16 I guess
that we've had variances come before the Planning Commission and City Council and it's
frustrating to say the least and I think that you know to support what the city attorney said, is it
you know, is it a hardship to have grass over a brick paver patio. I would be hard to say that that
would be the case. We put the ordinance in at 25% for all the right reasons and it's reinforced by
the difficulties we've had with the development that sits below this one for the 100 year storm we
had last year, the year before so. We saw intimately what the impacts of runoff can do to homes
and to parks and to everything else that we had, which is substantial. So do I see a compelling
reason to grant a variance in this case? I don't but what I do see, which I haven't seen before is a
creative idea of ways to mitigate it. I don't think I'm ready to, and certainly staff isn't ready to
say a dry well is a reasonable alternative but I can say from personal experience I have one. I
draintiled my house on the outside 3 years ago and put in a dry well about 5 feet down. I happen
to look at it and dig it out this year because I was curious to see whether it required any
maintenance, and it hasn't in 3 years. And it's working wonderfully and so, although I am not
comfortable approving this tonight, I would offer that I think the dry well concept has a lot of
merit and probably much more merit than in the discussions we've had over this last year about
pervious pavers and impervious asphalt. I think, and I don't know why I didn't think about it
before because I…3 years ago but it wasn't for impervious surface issues. For different reasons
but you know Todd to your point, the cycle of the seasons hasn't seem to do that, having pause or
a negative affect to it. At least mine worked well. So that being said, you know I don't really see
the reason to say yes to this. I think we've been pretty aggressive to try to make it as small a
variance as we can, and I guess, I applaud staff for trying to get down to close to 25 as we can,
29
72
City Council Meeting - September 24, 2007
but we're not there and I've turned down a lot of people that weren't there, and I feel bad about it
but I'm doing it for the right reasons and that's the reason why I recommend that we deny it
tonight.
Mayor Furlong: Thank you. Other thoughts and comments. Councilwoman Tjornhom.
Councilwoman Tjornhom: Yeah, these are, these are the cases that I really always struggled a lot
and it's very easy to just be reasonable and say it's 3.3%. You're doing something good to your
home. You're adding value. You're making our neighborhoods and our city a better place to
live. But the problem is you have homes all around you and they all had to live with this same
criteria of 25% hard coverage surface, and there's a reason for that because we all have seen what
water runoff does. I believe there was a neighbor in Manchester who called in saying that his
basement had flooded. Well you know the 25% protects everybody and if we all tried our best to
keep to that 25%, I think we've shown that that works and so I also am inclined to go with staff's
recommendation of not granting a variance due to the fact that we've been consistent so far as a
council with our coverage and I would like to stay on that same track.
Mayor Furlong: Thank you. Councilman Litsey.
Councilman Litsey: I agree with what's already been said here. I think it's been well put in my
comments and what I've already said is…so I'm comfortable with supporting what's been said.
Mayor Furlong: Thank you. These are difficult, especially when work has already begun and
there's improvements being made to the property and then a stop work occurs and that is a
challenging situation that I can empathize with. I think also I can empathize with the comments
made by Mr. Papedis earlier with regard to expectations of buying a home in the city. This is a
great place to live and people want to move here. They want to build nice homes. We have seen
time and again the size of the homes relative to the lots generally increasing and this is a
situation that I don't think will change in the near future, or at least from what I've heard and seen
in this neighborhood and development. The issue comes down to reasonable use. What's
reasonable use? One person's use is different than another's. What is reasonable? We try to find
that in our ordinance and to Councilwoman Tjornhom's point, we try to hold everybody to the
same standard and that standard includes a type of home in terms of structure and some
components but it also includes the size of the home and other impervious surface coverage
relative to the lot size. We heard this evening on topography and shape of the lot were part of
the hardship here. I'll deal with the last one first. Shape of lot I struggle with. We spent a lot of
time during the platting process to make sure we don't have lots that make, that create an
unreasonable use situation or that put us into a situation that would justify a hardship or a
variance. With regard to topography, Chanhassen is not on a plain. We're not flat. We have that
everywhere and I'm a little concerned with regard to, to the retaining wall issue. I think that is
something that we need to spend some time on and make sure that we treat people fairly and
equally. That is our role and the, to that end there are a number of developments that don't have
flat back yards and retaining walls are used to create that but they may provide a benefit, as we
heard here this evening but that is not something that we looked at in the past. In this case I'm
relying on staff's interpretation that this is an improvement for this particular situation but I don't
know that that's a question that we're comfortable taking at this point.
30
73
City Council Meeting - September 24, 2007
Kate Aanenson: Correct.
Mayor Furlong: That leads me to my other point and that is for instance in making sure that
what we do for any property owner we're willing to do for others and I'm not sure that at this
point I am too intrigued by the technology that is being presented here as an opportunity. I don't
think that I'm willing to support it tonight through the variance process, but that too is something
that we can talk about and if it is something that we want to adopt in ordinance, then we would
always have that opportunity outside of the variance process for any property owner in the city to
utilize that type of technology at their home and at their property when and if that time comes so
I think that's something that this is going to be an ongoing issue. Storm water management is a
challenge for this city. We heard the 100 year storm mentioned earlier this evening. We had two
of those in about a year period so we got at the end of the 100 years and beginning of 100 years I
guess but, and this particular area of town was very hard hit in a couple of those and to your
point, we saw what happened. And so I am at this point I too don't see a compelling reason to
provide a variance from a hardship standpoint. I believe reasonable use is available here and I
believe that with regard to the adjustments that have been made already, with the retaining walls,
that still provides some additional improvements that can be made, if I'm understanding that
correctly and so I think staying with the 25% as has been interpreted and calculated by staff is a
correct thing to do in this situation. So I feel and empathize for the property owner. I don't think
you're going to be alone. I know that probably doesn't help but I think the issue comes back to,
as was mentioned earlier, what was identified back at the time that the subdivision occurred, and
that was storm water. Storm water management. We spent a lot of time talking about the size of
ponds in this particular part of the development I recall in particular and that the nature of the
runoff and so I think that was clearly an issue that we saw going in. So unfortunately for the
property owner I believe we have to deny the variance. I'm grateful for the work that was done
to try to find some accommodations, which I think has been done given the situation and then I
think at this point given what we have and what our ordinance says, this is what we can do. To
the extent that we proceed in the future and seek to adopt some different standards to our
ordinances, and those again would be available to everyone in the city and would be the proper
way to go so at this point I guess, unless there's any other comments from the council at this
point, is there a motion?
Councilwoman Tjornhom: Mr. Mayor I make a motion that the City Council deny variance #07-
19 for a 3.3%.
Kate Aanenson: I believe that was 5 point.
Councilwoman Tjornhom: Is it 5.0?
Roger Knutson: 3.3 in the revised.
Kate Aanenson: Okay.
31
74
City Council Meeting - September 24, 2007
Councilwoman Tjornhom: Okay. 3.3 hard surface coverage variance from the 25% maximum
hard surface coverage for the addition of hardscape in Pinehurst 2nd Addition based on the
findings of fact in the staff report with the following conditions, number 1.
Roger Knutson: Mayor, does that also include the extra finding that Bob read? That would
include a correction of that finding which currently says 5.3. Now it's 3.3.
Mayor Furlong: And the condition is that it shall not exceed 25%. Okay.
Councilman Litsey: As stated I second that.
Mayor Furlong: Okay. Is there any discussion on the motion?
Councilwoman Tjornhom moved, Councilman Litsey seconded that the City Council
denies Variance #07-19 for a 3.3% hard surface coverage variance from the 25%
maximum hard surface coverage for the addition of hardscape in Pinehurst 2nd Addition
based on the findings of fact in the staff report with the following condition:
1. The hard surface coverage of the site shall not exceed 25%.
All voted in favor and the motion carried unanimously with a vote of 4 to 0.
COUNCIL PRESENTATIONS: None.
ADMINISTRATIVE PRESENTATIONS:
Todd Gerhardt: The only thing I had to add is that we have made ground with MnDot and have
received deeds for the southern fire station property off of Lyman. You'll see that probably on
our next City Council agenda for you to approve the deeds.
Mayor Furlong: Other discussion items?
Councilman Peterson: The only other one, I don't know where this is appropriate but in this last
staff report, the narrative describes that it's the developer and the real estate's agent duty to
inform perspective homeowner. I guess as a matter of future, it's not the real estate agent's duty
to inform from a legal perspective, just to clarify. Protecting those real estate agents…
Mayor Furlong: Okay. Any questions for Mr. Gerhardt? I guess one thing, I'll use this as an
opportunity to point out, Mr. Oehme is here. Tonight in our consent agenda, one of the requests
from Mr. Oehme and our engineering department was to approve a joint powers agreement for
the scoping study for Highway 5 from Highway 41 west through the cities of Victoria and
Waconia and out to Norwood-Young America. That was the first step that is actually a joint
agreement between those four cities, the County of Carver as well as MnDot who will be
providing some in kind services as part of those studies and that's something that I think has been
an issue for a number of our residents and with that study it will start moving us along towards
being able to make some improvements, safety improvements as well as capacity improvements
32
75
City Council Meeting - September 24, 2007
33
along Highway 5 west of 41 towards Victoria and out towards Waconia and Norwood-Young
America so I think that's a good step that we have taken and that the other cities along the
corridor along with the county and state are taking.
CORRESPONDENCE DISCUSSION.
Mayor Furlong: I guess I'd just like to make one comment and that is, thanks to staff for putting
together and researching the request that was made at our last meeting regarding the Preserve
development and appreciate the time and effort that they put in in terms of responding to that
request from the County so thank you very much for that. If there's nothing else to come before
council this evening, we will reconvene our work session upon adjournment. Is there a motion to
adjourn?
Councilman Litsey moved, Councilwoman Tjornhom seconded to adjourn the meeting. All
voted in favor and the motion carried unanimously with a vote of 4 to 0. The City Council
meeting was adjourned at 8:55 p.m.
Submitted by Todd Gerhardt
City Manager
Prepared by Nann Opheim
76
CHANHASSENPLANNING COMMISSION
REGULARMEETING
SUMMARY MINUTES
OCTOBER 2 2007
ChairmanMcDonald calledthe meeting toorder at7 00 p m
MEMBERS PRESENT MarkUndestad DanKeefe Kathleen Thomasand Jerry McDonald
MEMBERS ABSENT Debbie Larson KurtPapke and KevinDillon
STAFF PRESENT KateAanenson Community Development Director Bob Generous Senior
Planner Jill Sinclair Environmental Resource Specialist Todd Hoffman Park and Rec Director
and Krista Torgerson Natural Resources Technician
PUBLICPRESENT FOR ALL ITEMS
Jerry JanetPaulsen 7305 Laredo Drive
DebbieLloyd 7302 Laredo Drive
PUBLICHEARING
SCHERLE VARIANCE REQUEST FORAN AFTER THE FACTVARIANCE TO A
SIDE YARD SETBACK TO CONSTRUCTAGARAGE ADDITION ON PROPERTY
ZONEDPLANNED UNIT DEVELOPMENT RESIDENTIAL PUD R LOCATED AT
8541 FLAMINGO DRIVE APPLICANT DAVID JULIESCHERLE PLANNINGCASENO0722
Public Present
Name Address
David Julie Scherle 8541Flamingo Drive
Daniel Tan 8551Flamingo Drive
Robert Whims 8556Flamingo Drive
Bob Generous presentedthestaff report on thisitem Commissioner Undestad asked for
clarification on the squarefootage ofthe shed and meeting the impervious surface requirements
Commissioner Thomasasked about the possibility ofplacingthe shed behind the garage The
applicant DaveScherle explained why the shed needs tobe locatedwhere itis and not behind
the garage ChairmanMcDonald opened the public hearing Robert Whims a neighbor wholivesdirectlyacrossthestreetstatedhissupportforthevarianceDanielTananotherneighbor
stated the garage looked goodand supported the varianceas well Chairman McDonald closed
the publichearing Afterdiscussion andcomments the followingmotion was made
Undestad moved Keefe seconded thatthe Planning Commission denies Planning Case 0722fora7foot3inchsideyardsetbackvariancefromtherequired10footsideyard
77
Planning Commission Summary October2 2007
thsetbackfortheconstructionofashedonLot4Block1LakeSusanHillsWest5
Addition based onthe Findings ofFact in the staff report The Planning Commissionfurtherdirectsthat
1 The applicantmust move the shed andcomplywith the Zoning Ordinance
2 The applicantmust revegetate all removed hard surface areaswith grassseed orsod
All voted in favor except Thomaswhoopposed andthe motion carriedwith a vote of3 to
1
COMPREHENSIVE PLAN PARKS OPENSPACE NATURAL RESOURCES
ELEMENTS
Public Present
Name Address
TimErhart 9611 Meadowlark Lane
Glenn Stolar Parkand Rec Commission
Kate Aanensonreviewed the processofholdingpublic hearingson the different sectionsofthe
comprehensiveplan Jill Sinclairreviewed the natural resources section inparticular thenaturalcommunitiesandforestrysectionsandKristaTorgersonreviewedthewaterresourcessection
Commissioner Keefeasked forclarification on howthe goalscanbe achieved and budgeted
ChairmanMcDonald askedstaff toexplain howthe proposed changes willaffect the citizens of
Chanhassen Todd Hoffman presented information on the parksand openspace sectionofthe
comprehensive plan ChairmanMcDonald asked Glenn Stolar Chairman ofthe Park andRecreationCommissiontoexplaintheroleoftheParkandRecreationCommissionChairman
McDonald openedthe public hearing TimErhartasked Todd Hoffman toexplain the
assumptions used for the projection ofneeding an additional 37 acre community park in southern
Chanhassen The public hearingwas continued tothe nextPlanning Commission meeting where
the Sewer and Water and Transportationsectionswill be discussed
APPROVAL OF MINUTES Commission Undestad noted the verbatim andsummary
minutesofthe Planning Commission meetingdated September 18 2007 aspresented
Chairman McDonald adjourned the Planning Commission meeting at8 30 p m
SubmittedbyKate Aanenson
Community DevelopmentDirector
PreparedbyNann Opheim
2
78
CHANHASSENPLANNING COMMISSION
REGULARMEETING
OCTOBER 2 2007
ChairmanMcDonald calledthe meeting toorder at7 00 p m
MEMBERS PRESENT MarkUndestad DanKeefe Kathleen Thomasand Jerry McDonald
MEMBERS ABSENT Debbie Larson KurtPapke and Kevin Dillon
STAFF PRESENT KateAanenson Community Development Director Bob Generous Senior
Planner Jill Sinclair Environmental ResourceSpecialist Todd Hoffman Parkand Rec Director
and Krista Torgerson Natural Resources Technician
PUBLICPRESENT FORALL ITEMS
Jerry JanetPaulsen 7305 Laredo Drive
DebbieLloyd 7302 Laredo Drive
PUBLICHEARINGSCHERLEVARIANCE REQUEST FORAN AFTER THE FACTVARIANCE TO A
SIDE YARD SETBACK TO CONSTRUCTAGARAGE ADDITION ON PROPERTY
ZONEDPLANNED UNIT DEVELOPMENT RESIDENTIAL PUD R LOCATED AT
8541 FLAMINGO DRIVE APPLICANT DAVID JULIESCHERLE PLANNING
CASE NO 07 22
Public Present
Name Address
David Julie Scherle 8541Flamingo Drive
Daniel Tan 8551Flamingo Drive
Robert Whims 8556Flamingo Drive
Bob Generouspresented the staff reportonthis item
McDonald Mark anyquestions
Undestad Justone on thedriveway You saidthere wasa hard surface issue and nowthats
been with the shed squarefootageandeverythingelseisokay on there
Generous Right They removed theexcess There used tobe an expansion on the driveway
that was in there Theres some retaining walls and some otherthings thatthe property owner
removed inthe interim since when theywere firstnotifiedthatthat was an issueand the present
time
79
Planning Commission Meeting October 2 2007
Undestad Thesquare footageofthe shedarea is thatcanstay That squarefootageis okay
Generous Ibelieve thatwas included in Idontknow Ihad it Yes the shed was included in
that And itwould comply
Undestad Okay
McDonald Okay
Thomas Yeah okay Ofthe thingsthattheyremoved inthe interim does thatalsoinclude the
shed thats in theback oristhat
Generous No thatsstill
Thomas Thats stillthere on theproperty And then Isawin the paperwhere itsaidthecity we
maybe couldput it on the backsideofthe garage Ibelieve is what Iwasreading Is thatreally a
viablespace or
Generous Not ifyoulookatit not immediately behindthe garage
Thomas Okay
Generous Unfortunately thesurvey doesntshow all the improvements on theproperty Its
from the original buildingpermit applicationand soifyoulookatthe picture youcansee theres
adeck behind there
Thomas Okay
Generous But there is roomin therear yard that a structurecould be incorporated
Thomas Could be incorporated inback Okay That wasmy question Thankyou
McDonald Dan
Keefe The this isa PUD Is the setback in the rear 5 feet like itisinRSF Justoutof
curiosity Is it5in the back for accessory structures and then 10 on the sides and thats for RSF
right Andthatswhat was appliedin this particular PUD
Generous Yes
Keefe It is Soits consistent with the
Generous With the RSF
Keefe Withthe RSF Alright sowe donthave aconflict there Okay Thatsall Ihave
2
80
Planning Commission Meeting October 2 2007
McDonald Idonthave anyquestions atthis time for staff Is there someone heretopresent the
applicant Would youstep up tothepodium and state your name and address and just addressthecommissionersandtellusyoursideofallthis
DaveScherle Mynames DaveScherle 8541Flamingo Drive We thinkthe location ofthe
shed isthe best place for itand were hopingtoget the variancetokeep itthere Angie the
planner shewassuggesting we put itbehind thegarage where itwouldfit there but todrive ourmotorcyclebackinthatlocationwedhavetogoovergrassandwecantitjustthemotorcycle
weighs over 800 pounds and it itd be too much too dangerous Youd havetodrive over grass
ordirt and youcould damage the motorcycle orinjure the rider and the shed itselfwill havethe
same siding asthe house hasand the roofwill have the same kindofshingles asthe house has
and the soffits and the eaves willhave the same color asthe house too soitshouldfit rightinwiththehousebutitwontbepartofthegarageItwillberightnexttothegarageItwontbe
actually youknowconnected But its right next tothe tothegarage Wed have toremove the
sidewalkthat theshed is on right nowtomeettherequirements ofthe hard coversothats why
wed have tobe driving on grasstoget themotorcycle back there Sothats the main reasonwhy
we needitwhere its atrightnow Thats it
McDonald Okay Mark
Undestad Yeah just one wellactually a couple questions here The foundation isitabelow
grade foundationor isitjustthe sidewalk andyoure building
DaveScherle Justthe sidewalk Kind ofa floatingslab
Undestad Okay Soitwill move inthe wintertime when
DaveScherle Yeah Therecould be some movement with it yeah
Undestad And looking athowthis sits on there Irealize where youre atinthe stages right now
whenitsout there Didyoulook and see canitbe just pushed back along the garage a little
moretoget it out ofthateasement area
Dave Scherle Well Ilooked atthat and I there isnt youknow Iwasactually thinkingabout
doing that becauseI wasgoing totry getting some rollers underneath tomove itback farther but
itwouldstillbe inthat easement Otherwise yeah thatis areally goodidea Yeah there is it
still wouldbe in the easement
Undestad And that sidewalk thenthat youve gotalready pouredin there youcan maneuver
your motorcycle around the front ofthegarage toget intothat
DaveScherle It willbe alittletight butI thinkIllbe able todo it
McDonald Okay
3
81
Planning Commission Meeting October 2 2007
Dave Scherle Mighthave toput in a youknow Ima little Ivegot probably a little bitofplay
with the hard coverwhere Icould putin someconcrete blocks inthat cornertohelp make italittlebiteasier
Undestad Itlooked a little tight for that
DaveScherle Yeah Yeah itispretty tight sothat Imighthave todo that but there issomeeasementIvegotIdontknowhowmanyfeetbutIvegotafewsquarefeetIcouldjustgetthat
in there Because Iwould like to makeiteasyas I couldtoget in and out
Undestad Howfar back ifyoucould move itback do youknow did anybody howfar back
would ithave togobeforeitsoutsideofthe easement area Do youknow
Dave Scherle Imnot sure
Undestad 15 20 feet
Aanenson Id say about 20 yeah
Generous Probably alittle bitfarther
Dave Scherle Because thelong property line is not too far from the retainingwall so but itdoesyouknowitdoeshaveafewfeetbutyouknowforthatkindoffeetyoudhavetogoback
probably bythe oh the deck backthere I think probably toget tothatfar
Undestad Wouldithave tobe thatbig for the motorcycle
Dave Scherle Does what
Undestad Does ithave tobe thatbig
Dave Scherle No itdoesnthave tobe quite thatbig but youd stillwould have tomove itsofarbackIdontknowletsseethemotorcycles103incheslongIthinkItsprettylongButyeah
itwouldnthave tobe quite that big You couldmake itsmaller but ifthats what itwould take to
get it wecould do that too Imean itsable totake itdown and moveit I mean ifwe have to
welltakeitdownand thatsall thatstoittoo If wedontget the varianceso
Undestad Thats all for me
McDonald Kathleen
Thomas SoIwant toknowwhat kindofbikeitis
Dave Scherle Its aGold Wing
Thomas Gold Wing
4
82
Planning Commission Meeting October 2 2007
Dave Scherle Yeah
Thomas Okay We have a motorcycle too and I soI wasjust curious Then areyou is itgoing
tobe heated Is itjust going tobe like a garage
Dave Scherle Justagarage
Thomas Justlike a garage
Dave Scherle Yeah Not heated
Thomas Notheated Youllhave togostart itand okay Alright Imgood
Keefe Just toprobably statethe obvious were youaware thata permit was required for doing
that
Dave Scherle Ididntthink for 120feet or less youneededa permit for it That was what I have
heard beforeand Ithought that wasthe case for this
Keefe Okay thats it
McDonald Okay Wheredo youcurrently storeyour motorcycle
Keefe Its in the garagewith some lumber and stuff rightnowand the car isoutsideright now
McDonald Okay And howlong have youbeen doing that Is itjust kindofa seasonal thing inthewinteryoullputthemotorcycleaway
Keefe Well right now seeourold motorcyclethat we ownedbefore wejust got this July I
could fit in thegarage and itwas okay Plusitwas easier It was asmaller motorcycle Icould
drive iton the grassand get ittotheback shed tostore But in thesummer Icould yeahorsummerIcouldgetitoffthesidesoIcouldgetthecarinandoutandthenmybackwas
bothering me with that motorcycle sowebought thisother motorcycle toyouknow help out on
the back and it reallyhasbecause theres not muchvibration on aGold Wing
McDonald Okay Andthen on the shed itself howwidedoes itreally needtobe because itlooksasthoughcouldyounarrowthingsupBringitinclosertothegarage
Keefe See itsreally pushing itforeven a 4 Ivegot like a 4 1 2 foot garage doorthat Icanjust
get in there Thatsthe best I couldand letssee what isit 3 1 2 feetwideI thinkfrom mirror to
mirrorsotheres not alot even with that4 1 2 footgarage door for youknow youhave a littlebitoneachsidebutyouwantsomethingoneachsideofthemotorcycletogetintheresoyou
donthit Hitthe door
5
83
Planning Commission Meeting October 2 2007
McDonald Okay Andthe retaining wall thatsshown in thatphotograph isthat something that
was builtas apart ofputting the shedup orwas thatalreadyexisting
Dave Scherle That was alreadyexisting and theonlything thatsleft ofthat isthe retaining wall
the lengthof theshed Its been removed infront ofit Well itactually goes a little bit in front of
the shed It goes probablyapproximately 3 or4 feet Icantremember exactly Theresan
apron Itcomes out tothat Actually itshows on the picture here That itcomes out TheretainingwallcomesouttothereSoyeahsotheretainingwallstartsthereandgoesallthe way
tothe backofthe shed rightnow The resthasbeenremoved because ofthe hard cover
McDonald Okay Andokay currently youvegot a patio on the back sidesothatswhy youre
sayingthatthe shed actually couldntbe moved aroundtothe back then
DaveScherle Well ifwe did moveitaround totheback youd have a hard timegetting the
motorcycle toitbecause Id have tobe going on grass with itand youshould really be on hard
surface tobe moving thatmotorcyclearound Because itcouldeasily youcouldeasily dump it
Ihaventdumpedityetand Ihope Ineverdo Itsa lotofweight topickup
McDonald 800 pounds thatsgoing tobe kindofhard
Dave Scherle Yeah
McDonald Well Iguess Idonthave anymore questions at this point
Undestad Justone more
Dave Scherle Okay sure
Undestad Theshed is the primaryuse is itfor thewinterstorage ofthe bike oris itjust for all
time
DaveScherle It will be all the time is what we were planning on using itfor
McDonald Okay Well we thankyoufor coming up and addressing usthen
Dave Scherle Thank you
McDonald Okay At this time then Iwould openup the floor for public comment on thisissue
and ifanyone wantedtocome up and makecomment pleasedo so When yougettothe
podium ifyouwill state your name and address and address your comments to the commission
Robert Whims Hi ImRobert Whims I live rightacross the street from Dave 8556FlamingoDriveandIjustwantedtosaythegarageitlooksgoodsoIhopeyougiveittohim
McDonald Okay thank you
6
84
Planning Commission Meeting October 2 2007
Daniel Tan ImDaniel Tan 8551Flamingo Drive Justa neighbortothe side You know
aestheticallythe garage looks goodand Ithink youguys Ithink I think youguys should letitbethereThankyou
McDonald Okay thank you Does anyone else wish tocome up beforethe commission Okay
well atthatpoint then Iguess Iwill closethe public meeting portion ofthis and Illbringitback
up for the commissioners for opendiscussion then Whydontwestart downhere with Dan
Keefe Yeah Ive got justsortoftwo thoughtson it One isyouknow ifweallow this togo in
on this side and thensay thenext door neighboror youknowthats adjacent tohim youknow
decides they want todo that and because its on this wesortof maybe areobligatedtodo that
Thenyou end up with aprettysmall space inbetween the houses Doweend up witha potentialyouknowissuewithfireandbeingabletogetemergencyvehiclesorsofaryouknowIthink
in part thepurpose for the setbacks is toallow youknow spacefor spacebetween thehouses
both for maybe emergency vehicles and then alsojust for aestheticreasons sokindoftorn on
thatissue Idontknow ifyouguys have anythoughts on that The side setbacks
McDonald Thatskindofwhat Imkindoftornbetween too Those thingsare put inthere for
the reason thatyoustate Its very Imean weface this same problemjust about everythingthat
comes before us You know developers comein selluson a house Itmeets the setbacks and
theygo righttothe limit and thenwe end up with the homeownertrying todo something andwe
tellthemthey cant But the setbacksarethere for a reasonand youknow wearevery consistentwiththatsoyeahIunderstandImkindoftornonthismyselfKathleen
Thomas Imthe same issue Icantotally understandsetbacks ifwe grantthemlike thisit
creates like aslippery slope ofwhoelse willwant the same typeofthing butIunderstand what
the gentleman issaying about the shed Itbeing its really Imquite torn just becauseI seeitbothsidesso
McDonald Mark
Undestad Well youknow primarily its drainage inthere too Everything goes from the backofthatlotouttothestreettothefrontofthatlotYouknowifwestartpushingthosesetbacksand
drainagein there youknow youvegot a happynow Imsure he wants tokeephimthat way too
instead offlooding out hisbasement in there when the heavy rains comeinbut again nobody
likes toseesomething thats alreadybuilt and have tostart movingthings aroundbut youknow
thats again thats whywe have the setbacks andthe easements andbasically the no build
McDonald Yeah I guessthe thing Imkindoftorn between isthat youknow emotionallyyoure
probably oneofthe nicerguys tocome up before usand ask for this Most everybodyelse is
very muchin our faceabout why weought todo this The setbacks arethere fora reason The
drainage is veryimportant We have a lotofproblems withinthe city asfar asdrainage Everytimeadevelopercomesinthatspartofthedesignprocessthatwegothroughwiththe
developer tosay youvegot todo this as far as drainage and they put this stuff in What youre
askingustodo is similar totwo other applications thatcame in before usand Iknow that in one
casewe asked a guytotake out a gazebobecause he wason easement and drainage and itwas
7
85
Planning Commission Meeting October 2 2007
just goingtocreate a big problem It wasa beautiful structure He had a lotmoremoney intoit
by the timehe gottousthanyouknowwhat youve got atthis pointbut wehave toenforce therulesandtheyrethereforareasonOnethingstaffdoeswestudythesethingsveryhardtogive
homeowners maximum useoftheir property without interferingwith the rights ofothers I
understand and againwe all feel kindofyour pain about this Yeah 800 pound motorcycle
youve got toputitsomeplace Gold Wingsa beautifulbike and everythingbut theproblem that
we runintois that we cantbase decisionsbased uponthat Ijust dontbelieve we cando that oranyonecancomeinhereandagaingiveusagoodstoryandreasonswhywevehadtoturn
down people becauseofphysicalhandicaps and everythingand thatsthe hard part about this job
but Iguess youknow my leaning is yeah I would feelfor youandeverything Youve got a
goodreasonIguess for buildingthe shed tobegin with Iappreciateyour civilityabout coming
up here and the wayyouveapproachedthis and stuffbut Improbablygoingtohave tolean onthesideofwheretherulesareatIguess
Undestad CanI add one thing though Again Imean youcango tothecouncil on that but
these types ofstructures too when theyrebuiltwithout foundations on there and againbeing in
the area thatits inwith thedrainage and that theres potential for alotofmovement You knowhingingoffyourhouseYoucanbekindoffacedwithproblemsquiteawhileasthatthing
constantlygoes up and down You knowitwill pull away from your house Go back toyour
house Kind ofthe reasons too why youknow a lotofthe stuff sheds like this should be puton
somethingalittle more stable foundation wise
McDonald Any furthercomments Then Iguess atthis time were ready toaccept a
recommendation Whod like to
Undestad Illget it here Recommend the Planning Commission deniesPlanning Case 07 22
for a 7 foot 3 inchside yard setback variancefrom the required 10 footside yard setback for thethconstructionofashedonLot4Block1LakeSusanHillsWest5Additionbasedonthe
Findings of Fact inthe staff report ThePlanning Commissionfurther directs thatnumber 1 the
applicant must movethe shed Comply with zoning ordinance And the applicant must
revegetate all removed hard surface as with grassseed orsod
Keefe Second
McDonald Okay
Undestad moved Keefe seconded thatthe PlanningCommission denies PlanningCase 0722fora7foot3inchsideyardsetbackvariancefromtherequired10footsideyardthsetbackfortheconstructionofashedonLot4Block1LakeSusanHillsWest5
Addition based onthe Findings ofFact in the staff report The Planning Commission
further directs that
1 The applicantmust move the shed andcomplywith the Zoning Ordinance
2 The applicantmust revegetate all removed hard surface areaswith grassseed orsod
8
86
Planning Commission Meeting October 2 2007
All voted in favor except Thomaswhoopposed andthe motion carriedwith a vote of3 to
1
McDonald Okay motionpasses 3 to1 What Iwould suggest isyoutalk with the city staff on
this You have a righttoappeal this up tothe City Council The minutes ofthis particular
hearing will gointothe packetfor the City Council You may be abletoreach acompromise
with staff thatwouldwork within the ordinance and everythingand stillaccommodate whatyouwantIthinkyoullfindthemveryaccommodatingandtrytohelpgiveyousomeyouknow
good ideas astowhat todo
COMPREHENSIVE PLAN PARKS OPENSPACE NATURAL RESOURCES
ELEMENTS
Public Present
Name Address
TimErhart 9611 MeadowlarkLane
Glenn Stolar Parkand Rec Commission
Kate Aanenson Thank youMr Chair members ofthe Planning Commission As youknow
the lastyear wespenta lotoftime going through the evolution ofthecomprehensive plan whichImhappytoannounceisoutandoutforpressItdidgooutlastFridayforjurisdictionalreview
It isrequired for 6 month openhearing date sothat time is startingright now Ialsowantedto
let youknow youdo have a hard copy the entire hard copy in front ofyou Justfor everybody
else for their knowledge and information the entire comprehensiveplan draft ison the citys
website soifanybodys interested in reading aparticular chapter Ihope youread all thechapterstheycangoonlineanddothatThegoalofthepublichearingprocesstogetinput from
ourresidents toseeifwere movingin the rightdirection and addresstheir concerns Notonly
ourresidents but thejurisdictions that itgoes outto includesthe school districts the watershed
districts DNR just toname a few Sowere hopingtoget positive input orinformative input
that we canrespond toas wemoveforward in the process Soaswesetup this process weregoingtotakeacouplechaptersatatimeforyoutoholdthepublichearingandtogatherthat
input and atthe end ofthat process aswe break itdown wellmove intoJanuarywhere we
respond in writing tothecomments thatarereceived and the staff thatits more appropriately
addressedto willalso respondsoactually youllhave thatcollection ofresponses Sowhetherit
goes toengineeringorparks and recor planning wellrespond tothosecomments and youcanseewhatthoseareThenultimatelyyourcommentswillbeforwardeduptotheCityCouncilfor
their review and thenafter wehave the 6 month jurisdiction review itgoes up tothe Met
Council whogetsanother 60 daystoreview Sowerelooking probably in sometime thefirst
partofJuly for finaladoption SoIjust wanted everybodytoknowtheres plentyoftimetoget
comments intothecity Ifyouwant tocall and speak tothe personthatwould be mostappropriatetotalktowhetheritsengineeringcityforestertheplanningdepartmenttotalk to
and get your questionsanswered We hope peopletake the timetoreview that Sofor tonight
the firsttwochapters thatwellbe looking atwill be the natural resourceswhich includes
forestry natural resources and waterresources and thenpark andrec The Environmental
9
87
Planning Commission Meeting October 2 2007
Commission did review thatand Illletthosefolkstalk alittle bitabout theinput from the
EnvironmentalCommission and thenthe Parks and RecCommission alsohad an opportunity toreviewtheirchapterTheCityCouncilcumulativelylookedattheentireprocessbeforewewent
out topresstoo and is looking forwardtogetting the comments and the opinions ofthosepeople
reviewingit Sowith that iftheres anyquestions on the process that weregoingthrough
Otherwise Illturn itover for the presentation tonight Again thegoal here istoopena public
hearing Take comments Close the public hearingon this Again wellcollect all thosewhenwecomebackmorethanlikelyitwillbethefirstmeetinginJanuaryWellprobablystillbe
discussingland use in thatfirstmeeting in December and get thosecomments back will
probablygo intoJanuary toget thoseall back toyou Soafter weclose the public hearing
tonight we also ifyouhave questions for usor concernsthat youwant ustoaddress orthe
appropriate departmentheads here ordivisionshere toaddressthose wellbe happytodo thattooSowiththatifyoudonthaveanyotherquestionsIllturnitovertopresentations
McDonald I have onequestion from a procedural standpoint Just want tomake sure I
understand At the end oftonights meeting isthe meeting actually closed oris itstillopened
until Becareful
KateAanenson Itsstillopen The goaltonight istoallow for people togive input on this
particular topic but ifsomebody still wants atalater date even when weretalking about land
use ifsomeone stillwantstocomeup about parks The reason we noticeditiswehave the
appropriatepeople heretorespond tothoseparticular comments sothatshowthat can beaddressed
McDonald Okay Thankyou
Keefe Is therea formal submission in terms ofquestions I meanis itjust phone calls oremailsor
Kate Aanenson Whatever peopleare comfortable with If theywanttocall welltaketheir
namedown Wevereceived someemails on some particular issues soyoullseea summaryof
thosecomments And then howwe responded toitsoyoucanseethat weve and theresa longprocessforpubliccommentAndwerejusttryingtobreakitdownintobitesizepiecesandtry
tomakeit and this also was published inthe paper Noticed with thesetwo topicstonight And
then with input whichwevepretty much doneevery couple ofmonths tokindofkeeppeople
updated Andthen also certainly check the website because theres all the drafts areout there as
far as the hearing dates
McDonald Okay Andwith that Iguesswerereadytostart
Sinclair ThankyouChair commissioners Iwill brieflygo over we have an overview ofthe
natural resources sectionand inparticular the natural communities and forestry sectionsand thenIllturnitovertoKristaTorgersontogooverthewaterresourcesSobeforeIgetintothenew
revisionofthis chapter and this sectionI thought Id do a quick overview ofwhat is in thecurrent
2020 plan for natural resources and in that plan itestablishedkindofthe ground work for
protection and importance ofthe natural resources and itemphasized the value and the
10
88
Planning Commission Meeting October 2 2007
significance oftheseresources tothe Chanhassen residents and thatthere isa needfor avariety
ofresources whetherit be fieldorforest orlakeoranything like that Andthen italsoidentifiestheindividualresourcesItcalledoutfornaturalfeatureswhichincludedtopographyand
drainage and vegetationand then wenttomore specifically lakes wetlands creeks and rivers
tree cover wildlife and vegetation and thenalsoaddressed ground water protection and
agricultural character preservation Now in the revision wekindofget a broader perspective on
things and werelooking at3 main objectives for thatfor natural resources We continue withtheprotectionWestillwanttoemphasizethatbutwerealsoseeingtheneedfortherestoration
and managementcomponents for natural resources And we modifiedthe approach tothese
resources You knowall the dominantfeatures lakes wetlands fields forests thatwere
mentioned earlier are nowcovered under kindoftwo mainumbrellas and thatis natural
communities and water resources For natural communities that kindofencompasses thediversityofcommunitiesinChanhassenagainfromforesttoprairieslakestowetlandsas well
asbluff areas and its acomprehensive approach tothe natural areas thatallows for abroad
representation ofthe different communities we have existing in Chanhassenright now The
goals for the natural communities include thepreservation and protection ofthe varietyofnatural
environment and recognizing the importance ofthenatural environments tothe quality oflifeYouknowitmeansalottotheresidentshereiftheycancomeoverariseofthehillandhavea
greatscenic vistaofrolling hills ora forestoranything like that And thenemphasizing the need
toprotect and enhancetheseresources Which then leads ustothe management plan component
As we increasethe amount ofpublic natural areas its necessarythat we get toorganized and
prioritizethese areas and their needs Anatural resourcesstewardship plan will be vital toestablishingtheprotectionrestorationandmanagementneedsoftheseareasAswellasan
urban forestry plan tokindofguidecity activities regardingthose assets The goals for
managementplan including gauging the publicin the managementofnatural areas aswell as
restoration protection and improvements ofnatural communities throughproper management
techniques This isan example ofsomeofthe current restorationprojects we have and somepotentiallyfutureprojectsImnotsurehowitdoesntcomeupthatwellbutslashedareasare
current land management areas Yellow slashingarecurrent water restoration areas And then
the shaded areas whetheryellow orred are potential areas Everything thatis highlighted in
black is publicspaceright now Some ofthe yellowareas include public and private areas It
may looklike a smallamount ofarea compared tothe entire totalofChanhassen butthe time andmoneythatsrequiredtomanagetheseareasisquitegreatanditwillcontinueasweacquire
moreand more land as developmentgoes on Some ofthethingsthat we do aspart of
restoration for natural areasin Chanhassen right nowareburns for prairie management
buckthorn removal and then starting this yearwe started doing some garlicmustardremovalas
well Whats notshowing and whatwe also do is planting Tree planting perennial shrubsthingslikethatKindoftheicingonthecakeaftertheworkisalldoneNowforurbanforestry
Iwas really excited when Ifound these twopictures 1954 Chanhassen isa fairlybare area and
then in 2001we have aniceaerial view ofChanhassen and itlookslike a lovely leafy green
city Andthats whatwerestrivingtocontinue well intothe future Andthis green
infrastructure which isalong thelines ofgray infrastructure buildings and streets things likethatgreeninfrastructurehaspubliceconomicbenefitsaswellYouknowtreesreduceair
pollution Aheatisland effect Theyincrease property values Theyreducerunoff and erosion
They have a lotofeconomic impact on ourcommunity and as suchthey should be viewed as
assets and managed asan investment To that end we have two goals and thats increasingthe
11
89
Planning Commission Meeting October 2 2007
totalcoveroftreesin Chanhassen and then maintaininga healthy and diverse urban forest We
have multiplethreats on the horizon whether itbe the emerald ashbore or newdiseases thatcomealongthathavethesameimpactasDutchelmdiseaseEnvironmentalimpactssuchasa
drought thissummer youknowthat all hasa profound affecton our treesin town and weneed to
respondtothose asquickly as we can Anurban forestrymanagementplan wouldhelp usdo
thatmore effectively And thensome ofthe thingsthatwe will help usget tothatpointof
having ourgoals metwould be maintaining ourcurrent treeinventory Wehave inventoriedmosttreesonpublicpropertyrightnowItwouldbenicetohavethatimplementedandputinto
ourGIS completely sothatits informationthatcouldbe used on differentplanningand
engineering projects Developing aforestry management planwill be crucial tomaintaining a
goodforestry program here inthe city Andthen implementing atree coveranalysis which
would letus know notonlyyouknow ifwe have a goal ofa 50 cover howclose arewe tothatAndyouknowisit80ashIsit20mapleYouknowwhereareallthespeciesfalloutSo
that is kindofthe land part ofthe natural resources section Krista Torgerson will continue with
the waterresources
Torgerson Imgoing tostart with thegoals ofthewater resources program for the 2030 compplanThefirstbeingprotectandrehabilitatewetlandsMaintainorimprovefunctionandvalue
Provide information and educational resources in order topromote an activepublic role
Maintain primaryresponsibilities for managing water resources atthe local levelwhile
continuingtocoordinate and cooperate with other organizations and agencies Preserve and
protectthe varietyofnatural environments Protectand enhancenatural and waterresourcesachievewaterqualitystandardsinlakestreamsandwetlandsAndthenfinallyestablishand
maintaina comprehensive water resources programthatprotectsand improves the qualityof
existing water resources Part ofthat a big partofthat is theSecond Generation Surface Water
Management Planwhich wasadoptedin Augustof2006 The purpose ofthis plan is toservethe
city as a guide inorder toprotect and preserve and enhance water resources Sothe goalofthisplanthemaingoalisa100yearfloodprotectionclassificationofallsurfacewaterbodies
including wetlands Achieve water quality standards in lakes streams and wetlands Minimize
erosion and sediment Establish and maintainwater resourcesfunding sources Maintain
primary management responsibilitywhile continuing tocoordinate with other agencies and
organizations and then education There arethree main surface water features in the cityofChanhassenThosebeinglakeswetlandsandthencreekandrivercorridorsTherearetwo
main sources ofpollution that impactwater quality for oursurface waters The firstis point
source pollution This ispollution generated bya singleuseor source Some examples ofthis
would be directdischarge from businesses factoriesor treatment facilities Non point source
pollution isnot generated bysingle source and thereforeharder toidentify Some examples ofthisarerunoffcontainingfertilizersyardwasteorotherhazardousmaterialsforexampleroad
runoff Oilmaybe spilledin parkinglots thatsortofthing Startingwith lakes Chanhassen
contains 9 majorlakes ChristmasLake Lake Ann Lake Lucy Lake Minnewashta Lake St
Joe Lake Riley Lake Susan Lotus Lake and Rice Marsh Lake Inorder toaddressthe
management and monitoring ofourlakes theres afew differentthings thatwe do thatarespecifictolakemanagementLakemanagementplanThisplantheseplanslistgoalsfor
increasing fish population reducingnutrients exotic species control and somelandscaping for
water quality Lake monitoring the city monitors current lakeconditions through aquatic
vegetationsurveys lake water qualitystudies and lakemonitoring data Thecity ofChanhassen
12
90
Planning Commission Meeting October 2 2007
alsoparticipates in the Camp program which isacitizen based program The residents from
each lakeis responsible for collecting waterqualitydata throughoutthe summer and thenrecordingitwiththeMetropolitanCounciltocoordinatethatdataAlsodiscussionsdescriptions
and recommendations for each lakeisincluded inthe surface water managementplan
Wetlands TheWetland Conservation Actpassed in1992 with the goal ofwetlandprotection
preservation TheMinnesotaBoardofWater and SoilResources overseethe regulation ofthe
WCA for theState ofMinnesotaand their local government units implementtheWCA TheCityofChanhassenwasappointedasanLGUandactsasthegoverningagencyforwetland
activities within the city The surface watermanagement plan brought further updates the
Second Generation in wetland managementclassification The City ofChanhassencontinues to
be progressive in its goalof wetlandprotection preservation byupdating ordinances and Iguess
Ishould say adoptingnew ordinances andregulations Chanhassen contains the SeminaryFenwhichisawetlandthatsuniqueandsignificantcharacteristicsItalsohasawetland
classification rating asoutstanding And thatis the picture that youseein the backgroundthere
Creek and river corridors City ofChanhassen lies within 3 watersheddistricts The Lower
Minnesota River the Minnehaha Creekandthe Riley Purgatory Bluff Creek WatershedDistrict
The Bluff Creek Watershed District isthe largest within thecity and thats whatis shown on therightSignificantcreekandriveramenitiesinChanhassenAssumptionCreekwhichistheonly
native troutstream in Carver County and flows alsothrough theSeminaryFen Minnesota
River Assumption Creek andthe National Wildlife Refugelocated in thesouthern part of
Chanhassen Bluff Creek which is approximately7 miles in lengthand hasabout a70 foot
gradientdrop from Lake Minnewashta tothe MinnesotaRiver Protection and management forallofthecityssurfacewaterresourcesThesurfacetheSecondGenerationSurfaceWater
Management Plan discussion description and recommendations for all surface water bodies
within Chanhassen City code includes language such as thatprotects and helps us manage our
surface waterresources including the shorelandmanagement district bluff protection
impervious surface restrictionsunderArticle VIIIPlanned Unit Development district ErosioncontrolrequirementsandinspectionforconstructionsitesPostconstructionstormwater
managementandnewdevelopment andre development and wetland ordinances Storm water
treatment The NURP pondingor NationalUrban Runoff Program and then otherBMPs or Best
Management Practicesinclude rain gardens city streetsweepingprogram and erosion control
measures Andthen in the backgroundthats the plantingofthe Lake Ann rain gardens AndfinallyeducationAnnualpresentationoftheNPDESpermitArticlesintheChanhassen
Connection Information on the citys web site The Clean Water hotlinewhere residents can
callin with issues or questions Stormdrain marking programs Avolunteer program where
volunteer groups cancoordinate with the city tomarkstorm drainsin certain neighborhoods
Andthen neighborhoodprojects and programs
Kate Aanenson Sowith that ifyoudonthave anyquestions immediately thenwellmaybe let
parks and rec go and then ifyouwantedtojust kindofcircle back toquestions ifthats okay Mr
Chair
McDonald Didyouwant particularquestions on whatwe
KateAanenson If youd like to youcan do thosenowor youcanwait Because youre going to
openitup for public hearing too
13
91
Planning Commission Meeting October 2 2007
McDonald Haveanyparticular questions orclarifications
Keefe Ihave just acouple general ones that mayapply toboth youvegot goalsattached to
what youre trying todo You knowone ofthethings that in regards tothe goals is youknow
theyre pretty broad youknow Maintain ahealthy and diverse forestand increase overall tree
coverage Is there youknow interms ofthegoal isthere more definitionaround thoseand sortofwherewewanttodothatandsaywewanttogetto15coveragebutisthatsortofbroadyou
know and that kindofapplies toboth areas And then relatedtothat issortofbudgetstuff you
know and howdoes that kindof nowthe really broad question inregards tothat somaybejust
for ageneral answer atthis point
Sinclair Itsa atthe end ofthechapter there aregoals and thensupporting the goals arepolicies
which arethe specifichowtogettothat goal Sowhere youseeincrease tree cover thatswhere
itsays youknowasa part ofpublic projects we are going tobe increasing boulevard plantings
and road improvement projects or weregoing torequire increased plantings in subdivisions you
know morespecific howtogettothat goal Youllfindthatatthe end ofthe chapter
McDonald Tokindoffollow up on what hes brought up Again arewelooking atnew
committees ornew commissions todosome ofthis stuff or because yeah Iagree The policies
arevery broad Theyre great Howdo youimplementthem and Idontthink citystaff byitself
cando itbecause Iknow youguys arenot that big but howarewegoingtoimplementall thisandachieveitEspeciallythewaterqualityandthoseissueswhicharebigissuesforpeople
livingaround the lakesandeverything How doyouintend toimplement all this
Aanenson Mr Chair canIanswer that Thatsa verygoodquestionand keepingin mindthat
the zoning the comprehensive plan is thevision statement Thebridge for the implementation isthezoningordinancesoasKristinwentthroughandtalkedaboutthestormwatermanagement
plan there arespecific goals in thatasabudget Partofwhatyoullbe seeing here is acapital
improvement plan for some ofthe implementationofthe butwhatsgoing tocome out ofthis as
what weissue with land uses we have toadopt someother ordinance asJill had stated with a
management plan There is acapital improvement project put inplace for thattodevelopthatmanagementplanandthatswherewegivedirectionaboutasshestatedhowmuchtreecover
the types ofspecies and thenfrom that wellhave tomodify ourordinance tomeetthosegoals
Sowe setthosetargets up We want toget thepublicscomment on those thatthese aregoals
this is the direction Isthis the visionyouwant toaccomplish and thatgives us the direction
working with the Environmental Commission and the Planning Commissiontodevelop thosetoolswhichwouldbethezoningordinancecodeenforcementbecausewewillberedraftinga
significant part ofthe city code to ifwe needtomodify ordinance for speciestypes or whatever
those standards would be
McDonald Okay Iunderstand whatyoure saying but as part ofthis this affectspeople livingwithinthecommunityandIguessthequestionImaskingishowdoweexpectthemtointerface
toall ofthis What arewe goingtoask ofthe people ofChanhassen
14
92
Planning Commission Meeting October 2 2007
Sinclair Well asfar as like the natural resources stewardship plan Isee I envisionthat as being
muchlike the development ofthe BluffCreeknatural
Aanenson Overlay district
Sinclair Well the Bluff Creek
Aanenson Oh natural resources plan yep
Sinclair Management plan where youknow majorstakeholders ofthatwatershed were invited
toparticipate inthe development ofthatplan sothat itbecomeskindofa wellspring ofideas
from the residents and the businessesand the members ofthis community Soyouhave tostartitsabroadgoalItsabigjobbutyouknowfromthegrounduppeoplewillbeinvitedto
participate in thedevelopment ofthat and from there youget more specific policies
Aanenson No I wasjust going toreframethat just a little bit Soyouvegot the vision Dowe
want tohave a management plan toprotect the resources Then ifthats thecollective goalofthiscommunitythenwegobacktodevelopingthemanagementplanwhichwesetupkindofa
subgroup and then fromthat we need toaffect theordinances the group Then we go tothat
step If thatmakes sense
McDonald Yeah itmakes perfect sense and part ofwhat youre trying toget out ofall this isinputfromthepublic
Aanenson Right
McDonald Partofthe buyin ofall this and thatswhy Imaskingthe question Whats the costtothepublic
Aanenson Right
McDonald What arethey going togiveup And thatmay influence whatquestions theyaskYouknowaretheygoingtoagreeordisagreewiththedirectionordotheythinkitsjustgoing
tomagically happen and I guessI dontwant toleavepeople with the impression thatits all up to
citystaff tomake this work
Aanenson No Andagain some ofthis is comingout ofthe community surveythatwasjustcompletedtoothatthiswasavaluenaturalresourceisahighvalueofourresidentsandsowe
wanted were out there saying ifthis isa true statement thenthis is wherewe need togo to
protectthatresource and thats developa management plan
McDonald Okay Thankyou Does anyone else up herehave anycomments or
Aanenson Wellletthe parkand rec
McDonald Iguess just a word tothe wise be very careful
15
93
Planning Commission Meeting October 2 2007
Hoffman Imgoing totry tofix it Therewego
Aanenson What pagedo youwant togo to Doyouwant togo toa map
Hoffman Yes You needtogo tofullsize
Aanenson Well youve got youreon the citys websiteright heresoifyouwanttojust help
and go to100 and youcanscroll for him ifthats okay
Hoffman Good evening My names Todd Hoffman Imservingas the Citys Park and
RecreationDirector and this evening Ihave with me GlennStolar whoisourPark andRecreationCommissionChairatthecurrenttimeSoChairMcDonaldmembersofthe Planning
Commission its mypleasure tointroduce toyouthe 2030 section parks and openspace plan
Give yousome introduction and thenwellstart talking about somespecifics with mapsand other
things Chanhassen ourpark and recreation system isa sourceofcommunity identity and pride
thatgreatly contributestothe residents qualityoflife The city hashistorically and willcontinuetoplaceastrongemphasisonparkandrecreationinourcommunityParkandrecreationsection
ofthe 2030comprehensive plan provides an overview and an analysis ofthe citys existing
system and welltalk about that It identifies objectives and policies thatwill guidepark and
recreationdecision makingthrough the year 2030as well as identifying key initiatives thatwill
be that wellneedtocomplete and enhance the current park system And talkabout thesystemhistorybecauseIthinkitsimportanttolookbackatwhereyouvecomefromand
accomplishments thatyouvemade todatewhen youreplanningfor the future Ourcurrent park
and recreation system is aresult ofalmost 4 yearsofplanningatthe city and citizen
commitment Inaddition toadding parkand trailstothe systemin conjunction with
development the community hassupported major initiativesfor park improvements throughouttheyearsIcanshowyouaninterestingpieceofhistoryAgreatpieceofhistoryandIllread
ittoyou Its fromthe 1969 Chanhassen Maverick Newspaper Itsan open lettertoChanhassen
residents It says too manycommunitieshave lostforever theinterestingword potentiality that
areyet available toChanhassen It istherefore becomes important that someofChanhassens
natural resources be immediately preserved beforethis village also settles intothe dogmaofjustanothercommunityThisis1969DiscussingthisThisbondissuewillprovidefundsforthe
realization ofour ownparksystem recreationalfacilities for families adultsand senior citizens
aswell asneighborhood playareas andfacilities for swimming tennis baseball picnicking
hiking skating hockey skiing and sliding and all this for the simple sumof 250 000in 1969
The referendumpassed and the majorinitiative from this referendumwas the acquisition ofwhatweknowtodayasLakeAnnParkThefirstpartofLakeAnnParkandthentheinitiationofa
community andneighborhood parksystem Sothat was thefirstinitiative Youcan readthe
names Itsa historicaldocument This wasfound in a basementhere rightin townand brought
toourattention sowethought ithad some historical significanceand weveused itasa
presentation material sincethe time thatwevebeenpresented with it Soagain ittookalmost 20yearsin1988thevoterspassedabondreferendumforPhaseIIofLakeAnnParkIfyou
remember thatwas about thesame timeEckankar wascomingtotown and acquiringtheir large
parcel Lake Ann was essentially doubled with the acquisitionofadditional section of parkat
thattime Also itwas righthere atameeting during the discussion ofthe referendumlanguage
16
94
Planning Commission Meeting October 2 2007
for the 88 referendum when a council member thoughtabout the most recent citizen survey
where people saidwe should setaside funds orallocate funds for theacquisition ofparkland inthesouthernpartofChanhassenSowithoutaquestiononaballotatthattimetheywere
approving the ballot that eveningandCouncilman Bill Boyt suggested totheother councilmen
councilmembers thatwe should maybe adda question for should thecity ofChanhassenuse
these bondsfor the acquisition ofland in southern Chanhassen Theother council peopleagreed
They had drafted a question thatnight They saidwhat should theamount be and they added300000thateveningtotheballotItpassedby4votesandthensome12monthslaterwe
acquired Bandimere CommunityPark back in1989 atacost of 6 500dollars an acre ora total
of 187 000for a 32 acreparcel Sothosetypes ofinitiatives when youbringthosethingsup at
acouncil meeting theypass by4 votesand thecity sets aside 32 acresofland which was later
addedon bythe Lundgren development tothe north are the kindofreally watershedmomentsthatifyoudontiftheydonthappenifyoudontmakethemhappenyoursystemreallydoesnt
come together We go further to1996 Again the samekindoffeelings thatwerehappening
back in 1969 People felt like wewere getting over developed Runover Ourcorn fields were
getting chopped down Replacedwith housing and roof tops and asphalt and we worked inthis
room for 18 months toassemble a committee citizencommitteetoput together a referendumAgainthevoterspassedthatbondreferendumandthatincludedtheacquisitionofimprovement
ofthe park system 18 neighborhood parkswere improved The construction ofBandimere
Park Soittook again almost 10 years once wehad the land setaside togetthe park developed
The reconstruction ofCity Center Park righthere on where City Hall sits And then
preservationofover 40 acresofopen space That was the Foxacquisition in southernChanhassenAgainlandvalueshadcreepedup23500peracreAgainatthetimea fair price
Todayyoucouldnttouchthat propertyfor that kindofvalue And then theconstruction of7
newmiles ofcommunitytrails It was really the turning pointfor ourcommunity trailsystem
Sothats somehistory Lets takealookatourexisting in ourcommunity the existing parks
fallintofour classifications Neighborhood parks communityparks specialuseparksandpreservesCommunityparkswecurrentlyhave5ofthoseSowecurrentlyhave5community
parks Bandimere inthe south Right down here City Center Park which isright adjacent to
City Hall Chan Rec Center Bluff Creek Elementary which isa40 acre site 20 owned bythe
city 20 ownedby the schooldistrict Andthen we also have Lake Ann and Lake SusanPark
and thosehave an emphasis on not onlyrecreationbut public lakeaccess Sothoseare the 5communityparksthatwehaveandtheyserveaveryspecificuseandforballfieldandactive
recreation Neighborhoodpark Theyre the parks thatpeople most oftenuse Theyre right
down thestreet Theyrevery convenient You comehome after work and youhave a chanceto
godown tothe neighborhood parkand participatein some activities and makeyour way home
Currently have 23 neighborhood parksthroughoutthe city 22 oftheseareownedand operatedbythecityTheresaninterestingstoryupinthenorthendCathcartParkIfwegoalltheway
scroll back down Thank you This park right here Cathcart Park is withinthe city of
Chanhassen but the property isowned by theCity ofShorewood It was giventothe City of
Shorewood bythe church acrossthe street and soitserves both Shorewood residents and
Chanhassen residents Theydo primarily all ofthe capitalimprovements and then we participateinsomeofthemaintenanceupatthatlocationSpecialuseparksWehaveOlsonCommunity
Garden is thecitys solespecial usepark Itsthe garden right hereatthe corner ofKerber
Boulevardand Santa Vera Drive Itsabout a halfacre in size It has10 by10 gardenplots It
was recentlyexpanded and theyre all all ofthosegarden plotsarein userightnowand were
17
95
Planning Commission Meeting October 2 2007
seeking toacquire additionalspace for community gardens in thefuture in thewestern part of
ourcommunity and the southernpart ofthe community and workingwith Jilland others AndthenparkpreservesWecurrentlyownover440acresofopenspaceprotectedin12park
preserves These areasencompass much ofthe Bluff Creek corridor as well as otherwetland
and wooded areas withinourcommunity Andagaintheyre adifferent class Theyrenot a
neighborhood park or a community park Theyre just there for preservation for thefuture Its
important tonote in ourcommunitythatwere blessedwith many othernon city recreationalfacilitiesthatdoesenterintohowpeopleutilizethenaturalresourcesandrecreationfacilities in
ourcommunity and Ijust wanttonote those Minnewashta RegionalPark 330acres right on
the shoresof LakeMinnewashta Verynice public facility operated byCarverCounty
MinnesotaLandscape Arboretum is locatedin ourcommunity They have 1 000 acre facility
675 ofthose acresarelocatedinChanhassen The Minnesota ValleyWildlife Refuge ItsalldowninthesouthernhalfOncewehittheblufftheblufflinethenwegetintostateand
federal This isthe Minnesota Valley WildlifeRefuge And then this is state land the Raguet
WildlifeManagement Areathatis managedand openedfor publichunting bythe DNR Golf
courses orone piece ofDNR land thats up on LotusLake on the west side Or excuse me the
east side ofLotusLake Rightin heretheres an 8 acre DNR parcel They purchasedthis reallyasanoutrightthreatthatifthecitydidnotdevelopapublicaccessonLotusLakethatthey
would developtheir ownpublic access on thatproperty and soitwasacquired some time ago
and itsjust been maintained every since Its open spacesince the city did goahead and develop
ourpublic access in thesouth part ofthelake Golfcourses Wehave 3 privatelyowned golf
courses within the community and thenCamp Tanadoona whichis againon Lake MinnewashtalocatedalargeparceloflandCampTanadoonaandCampfireismaintainingthisasoneoftheir
soleproperties in the metropolitan area Theyhave someother areas theyreally value and this
particular piece ofproperty Moving on we want totalk about trails and sidewalks Thecity has
puta significant effortinestablishing trails and sidewalks overthe past 10 years Justa dollar
estimate We have over 12 million investedin cash currently in our trailsystem It resulted inoveran80milecitywidesystemthatconnectsneighborhoodstoparksschoolscommercialand
civic destination and connects toadjacentcommunities Eden Prairieand Minnetonka
Shorewood Unfortunately manyofthoseconnections toother citiesjust kindofdrop off We
have made some connections when the othercities arecomingourway Eden Prairieprimarily
We have some futureconnections downtoChaska and then some futureconnections toVictoriaandShorewoodWerealsoblessedwithregionaltrailsWehavebothLRTsThesouthLRT
thatcomes from Hopkinsdowntooursouthern part ofthe community And thenthe northLRT
orthe northsection ofthe actually thesouth LRT right up herecrosses ournorthwest border of
the community These trailsareaccessed byresidentsthroughout Chanhassen and theytravelto
Hopkinsand thensomego back around and they alsocan go westtoVictoria from thenorthlooponthenorthLRTThosearemaintainedandrightofwayownedbytheHennepinCounty
Regional Railroad Authority andthen managed primarily byThreeRivers Park District asa
summertime amenity Inthe winter we have toapply for permits toallow for walking
Traditionally used asasnowmobile trailin thesouthern half Wehave not donethatfor the past
2 yearsand nowweveappliedfor walking snowshoeing cross country skiing permit And thenfromBluffCreekDriveifyouscrollbackdownThreeRiversstopstheirauthorizationhereand
the cityofChanhassen continues thetrailintoChaska atthis location Three Rivers wantedto
finda trailhead Once they hitCarver County theydecided tostop hereatBluff Creek Drive
and theyhave theirtrailheadlocatedatthatlocation And thenalso theregional trail much of
18
96
Planning Commission Meeting October 2 2007
the 101 regionaltrailwhich ison acounty systemnorth tosouthon 101 is in place Only the
southern section and a small little section in the northpart from Pleasant Viewnorth toMinnetonkaisnotinplaceThecommissioncurrentlyactedtoaddthissectionaweekagoorso
from PleasantView north toMinnetonka and Eden Prairie and thenthe southern halfwill be
workedon as 101 isimproved southofHighway 212 Andthatsa trailofregionalsignificance
on ourMet Council and regional maps Briefly totouchon recreation programs the city offers a
wide rangeofrecreation programsfor all ages We operate a senior center We operatearecreationcenterandweofferrecreationprogramsandspecialeventsfortheentirecommunity
Assessing futureneeds When Itouched on howwedo that Populationis one factor The
demand for parksand recreationis closely linked topopulation The populationstandardsact as
ageneral guideline for the minimum number ofparks per1 000 people These standards areone
method ofassessing needs and areappliedtoboth neighborhood and community parkland InChanhassenweusethestandardof5acresforevery1000peopleforneighborhoodparksand7
acres for every 1 000 people for community parks When youanalyzethosenumbers itshows
that we currently have enough parkland tomeet anticipated needs throughthe year 2010 but by
2020 therellbe a 12 acre shortfall in community parkspace and by2030 a37 acre shortfall in
community park space Thats a fairlysignificantdeficit when we get out to2030and we start toaddadditionalpopulationInneighborhoodparkswellonlyfall2acresshortintotalacreagebut
we have tomakesure that wehave thoseparkslocatedin strategic locations that area halfa mile
away from everyonesfront door If youthink about ourpromise toourresidents that moved to
this community weretellingthem thatas apart ofourcomprehensiveplan wellput apark
within a halfmileofyour front door Ageis alsoan indicatorofwhat typesofrecreationfacilitiesareneededWhenplanningparkfacilitiesitsimportanttokeepinmindthat
neighborhoods and communities go throughlife cycle changes and thatparkland must be varied
and versatile sothe system canadaptin the future as demographic trends doshift Park service
areas Itouched on thosefor both community and neighborhoodparks Ifwe can switchback to
the circle map Thats an interestingmap Its very useful for visualizingwhat hasbeen going oninourcommunityandparkserviceareasYepthatstheoneTherewegoTheparkservice
areas areshaded in green You needcirclesone halfmile radiusand yougo from acenter ofa
park and then youstart towidenout thearea Yellowarepark deficient areas and thesearethe
areaswe want tofocuson as development continues tocomein We need tostudy should webe
acquiringfuture neighborhood parks in thoselocations Acouple significant parcels thatwetakealookatthisyellowisprimarilytheWolpenTreeFarmandtheErhartpropertyandthe
101 highway is the barriertoservicing thatneighborhoodbytheexisting Bandimere Park and so
aswedevelop the101 roadplan we knowthatwewant toput an underpass there because we
already have the infrastructure and the facility in place Bandimere We talked about itearlier
for 6 500 an acre It costmore todevelop the land inthe park than itdid toacquireit We havetheinfrastructureinplaceTheparkisthereandthesenewneighborhoodscomeinallweneed
todo is provide an underpass and theyhave access toavery beautiful parkfacility No needto
acquireadditional parks andmakeadditional publicinvestments in these areas Inthese typeof
areas And thenas we movewest wellinfill thesepark deficient areas with additional facilities
Wealready have land thatis inthe Arboretum Village rightthere butitsnot developed sowhenthatdevelopsasneighborhoodparksthiscirclewillwidenoutSoasyoucanseethe
community hasdonea verygoodjob and youvewatched a lotofthesedevelopmentscome
throughfor park acquisition probably mostly 5 to10 years ago but weacquired many
neighborhoodparks todevelopment process Wanttodiscuss preservesfor a second Fora
19
97
Planning Commission Meeting October 2 2007
moment They do not have service areas Preserve areasarelocatedwhere there are important
natural resources that shouldbe protected One ofthe main initiatives ofthe 2020 compplanwastopreserveopenspaceandnaturalresourcesAsaresultoftheseeffortswevesetaside
those 440 acrestodate That is what projectedmuch oftheBluff Creek corridor These are
there are fewimportant treasurednatural areasthat remain unprotected These include the Bluff
Creek corridor southof really southofthe new Bluff Creek Boulevard atthis time The west
shore ofLake Ann Andthen the SeminaryFen property The west shore ofLake Ann isshowninourcomprehensiveplanasfutureparkspaceandthatalsoincludesshorelineonLakeLucy
And then SeminaryFen in the southern halfofthe community hasbeena topic ofconversation
for preservation for many manyyears At this time ourpositionasacity department istoallow
the state thecounty totry tocomeup with someinitiatives We wouldbe a partner tothatbut
were notgoing tobe the primary agency inthatacquisition effort Just totouch ontrends Ijustwanttothrowoutsomewordsbecausethesearethingsthatchangethewaywedobusiness
Activeliving isthe newkey phrase Compressed leisure time People dont theydo more things
in shorter periods oftime Environmental awareness is on the rise Interestin the artsis on the
rise We have an aging population across ourcountry Multi dimensional recreation People
dontwant todo more thanone thing ata time Rec programmingwe touched on People wantqualityversusquantityTheywanttheirfacilitiesandtheirexperiencestobeofhighquality
Trails we talked about that And then offleash dog areas and welltalk about that on thefinal
map Communitygardens are a hottopic and thatsbeen proven in town Disc golfand lacrosse
During the last section wetalked about goals and policies Iwontread thosefor the commission
tonight butwe have aseries ofgoals and policies toreally reach what we areproposing in theareaoffutureacquisitionanddevelopmentparksandrecreationAndthenwhatIwouldlike to
talk about isourfuture parkand recreation system initiativesand we have amapfor thatand
welltalk about manyoftheseideas cameout ofthe openhouses heldatthe library and the
recreationcenter Much ofthiswork is also comingstraightout ofthe park and recreation
commission And ifyoulookat acommunityitsreally an opportunity for just someadditionalfuturethingstohappenandtheyreimportantinitiativestobalanceoursystemintothefuture
Wellstart in the upperright Idontknow ifyoucanseethe pointer Welljust goclockwise
Planned underpass atHighway 41 This isto accessLake Minnewashta RegionalPark Withall
theseneighborhoods that can access take trails toLake Minnewashta Regional Park Atrail
connectionfrom Lake Ann ParktoGalpin Boulevard and this willbe with futuredevelopmentIfPrincespropertyiseverdevelopedthatwouldbethetimethatwewouldbothacquirethese
lakeshore properties and then create that trail Expand Lake Ann Park and completethe Lake
Ann trailloop what I just mentioned You go around the corner moresenior center expansion is
possible Parking lotexpansions If youve everbeenatthis location when youvegot multiple
activities going on in thesenior center the library and city hall youknow thatparking is tightWewanttotrytoexpandtheparkingonourCityCenterPlazaAndthenourseniorcenterisat
capacity or atnearcapacity manytimesand there might be afuture potential expansion ofthat
resource Railroadoverpass toour historic downtown If youwalk todayover the overpass of
Highway 5 youkindofstop ata deadend and youhave totake a sharpleft and comedown to
town We wouldlike tocontinue that right up and over the railroadtracks soyoucancome rightintodowntownonamuchmoreconvenientfashionLittlecontroversialtopicwiththebridge
thats been discussed inourcommunity for the past 10 or15 years But nevertheless an initiative
thatwere talkingabout RiceMarsh Lake trailloop Justwalked thislast Thursday Its Ithink
oneof the mostexciting initiatives tohappenintothe future Atrailall the wayaround the south
20
98
Planning Commission Meeting October 2 2007
sideofRiceMarsh through EdenPrairie and then Eden Prairieon this side and Chanhassen on
this side A4 mile trailloopwhenyouget all said and done We just recently with the 101gapprojectcompletedthetraillooparoundLakeSusanWereplanningforatraillooparoundLake
Ann and halfway around Lake Lucy You complete the trailloop aroundRice MarshLake and I
dontknow ofanyothercity besides Minneapolis that willhave alooped trail systemaround
lakes such asChanhassen will Explore possible locations for discgolfcourse BandimerePark
is oneopenand thenwerealsoopening up discussionswith the Carver County folksabout LakeMinnewashtaRegionalParkDiscgolfisverypopularwithyoungercitizensanditgivesthem
another opportunity toget outand recreate with theirfriends and family Underpass at
Bandimere Park We talked about that Expand existing nature preserve This is the Fox
acquisition Wewant toexpand ittothesouth and tothe north This issome excess right of
wayfrom MnDot and the expansion tothe southwouldcomeas development tothesouthtakesplaceConsiderpossibilitiesofthefuturegolfcourseWhatsgoingtohappenifthegolfcourse
comesin for development inthe community and we talk about trying topreserveitas agolf
course Traditionallyweve done that on a couple occasions Right nowits a great recreational
resource for ourcommunity Ifwe lose it what is theimpact on ourcommunity Overpass
underpass for Highway 212 If anyofyouhave taken the southern LRT youget alittle bitofcutinherewhenyouhavetocomedownandbackongradeat101Andunfortunatelywelostout
on someISTEA funding backin 97 HennepinCounty ThreeRiver Park District had some
funding for three projects Twoin HennepinCounty and oneout herein Carver County when
theyran out ofmoney They left Carver County out oftheloop and finished thosetwo in
Hennepin County sowere continuing towork with them We wouldlike togetthat improvedItmayhappennowwiththe101Highway101southimprovementsHighway101regional
trail Possible future corridor expansiontoinclude the SeminaryFenand soagain bringing the
fen in Including itin ourtrailloop Completion of theBluff Creekcorridor This isthe
preservationthat staken place inthe Bluff Creek corridor Forthe future continuetocreate
neighborhood parks Wetalked about thatearlier When theseareas develop the 2005MUSAandthe2010MUSAwehavetomakesurethattheyreservedwithneighborhoodparksorpark
facilities and sowe dontleave anybody outof thesystem Additional athletic fieldcomplex
Thatsour 37 acresthatwere shortand soby2030 wethink were going tobe 40 acresshort of
community park space primarily for ballfields andwe already feelthattoday andwerefeeling
thatcrunch in ballfieldspace Trail along Lyman Boulevard If theres anyon streettrailor offstreettrailbutalongaroadcorridoritsLymanBoulevardthatwewanttocompleteFortunately
with the road projects thatare comingup alongwith combined with the school this willhappen
This connection somany people dropdown Powersand Audubonand Galpin and then theyhit
this roadwithout a trailandthey renot veryhappy about that Its not a verypleasant experience
whenyoure out there either tryingtoget south toChaska or makea loop back up VeryscarycorridorWiththistrailwiththisroadprojectthattrailwillbecompletedandthatsgoingtobe
anicelink forus Wetalk about the Twin Cities and Western RegionalTrails traveling east to
westthrough Chanhassen If thatrailroad is ever abandoned then itshould become acommuter
rail or atrailcorridor ofsomesort Theres been alotoftalk about ballfield improvementsand
thats basicallyaround atown baseball team People arevery romantic about townbaseball ItusedtobeherewiththeChanhassenRedBirdsandChaskaastheirteamwiththeCubsandso
people aretalkingabout ifwe build atown baseball team orthe stadiumand bleachers where
would thatbe and Lake Susanisone possibility sopeople couldparticipate in Fridaynight
games orSaturday or Sundayafternoon games and watchingsome townbaseball in the
21
99
Planning Commission Meeting October 2 2007
community Possible rec center expansion People talk about should we everexpand the
recreation center should weadd a pool Shouldweput a bubble over someofthe athleticfieldsIfpossiblegradeseparatedcrossingatTrunkHighway41andHighway5Thisisgoing
tobecomea major corridor for travel throughout community Gettingpeopleintothe
Arboretum Should there be a grade separated crossing atthatlocation Theres alsobeen some
discussion aboutthat inour downtown Shouldthere be grade separated crossing for not only
roads but trails toconnect our northand south halfofourcommunity Highway 5 regionaltrailThisisveryimportantfortravelingwesttoVictoriaandbeyondandasHighway5isupgraded
cities ofVictoria and Waconia primarily willbe buildingthattrail Itsused nowfor recreation
but for commuter trail For bicycles and non vehiculartraveltowork and other destinations
Andthen lastly atMinnewashtaPark totheArboretum Trail connection Two regionally
significant facilities They should be abletoconnect with somesort ofpedestrian trail So whenyouthinkaboutideaswhatarethefuturepossibilitiesThatswhattheyareItsallcoveredin
the parkand open spacesection Illstandfor questions and Chair Stolarwill as well Thank
you
McDonald Thankyoufor the presentation Does anyone have anyquestions
Keefe Justtothrow out one quick one You knowtheseare all great ideas How do youget a
handle on what todo and whentodo itand what sortofprocess associated with that
Hoffman Theres also a 10 yearcomprehensive plan orCIP inthe document atthe end and sothecommissionspentacouplehoursonenightprioritizingthat10yearCIPsotheyretaking
theseitems and Ialways like tothink ofa budgetor a CIP as a value system Sowhat do you
value Whatofthose itemsthatyouveidentified aremost importantand they wentthrough that
process thatnight Theprimary driver ofpark and traildevelopment ispark dedicationfees
Thats howwe makethingshappen in ourcommunity Park dedicationfees will runout longbeforethesealltheseitemsareacquiredThingslikereferendumswillneedwillbenecessary if
the citywants torealizeall those thingsthatare identified in the plan
McDonald Okay thankyou Kathleen
Thomas No
McDonald Wouldyoujust talk tousa little bitabout the parks commissionand rolethat they
playin allofthis
Stolar Basically we arean advisory commissiontothe city staff Wework closely together so
youknow kindofabad term butofficially werean advisorycommission but we are a
partnership Basically wework hand in handwith staff on both identifying what are the
opportunities out there through either citizen input atmeetings similartothis or we do it
through some ofthe surveys and openforumsthatweve had especially with thecomprehensiveplanbeingoneofthoseandwehadprettynearthewholecommissionoutattheoneatthelibrary
that we all sothen we talked with citizens and just asked what aresome ofthethings ofinterestthtothemWeusedtoonthe4ofJulywewouldtakeaboothattheChamberofCommercetentththereforthe4ofJulycelebrationandwedhaveopensurveystheretoothatwedtakesopart
22
100
Planning Commission Meeting October 2 2007
ofourroleis helpingstaff gather input bothface tofaceas well as through surveys Andthen
ourofficialrolewould be we dorecommend tothe City Council the CIP The5 year and 10 yearandtheneachindividualyearweveprioritizedtheprojectsandrecommendthattoCityCouncil
and ask them tofun itout ofpark dedication fees and sothoseareourprimary roles We ve
taken an active rolein some ofthe relationshipswith Carver County The dogpark thats going
in toLake Minnewashta Afew commissioners formed a subcommitteeand actuallyworked
with CarverCounty tohelp identify thatas an opportunitysowe want tobe active membersOurofficialrolethoughwouldbetomakerecommendationstoCityCouncilbasedonstaffs
input
McDonald Okay Thats pretty muchall the questions Iwant tothankyou Itsa verygood
presentationand everythingand Imsure the citizens really appreciate all the work that theparkscommissionhasdoneandespeciallyyouToddIthinkitsoneofthejewelsofChanhassenAt
this point Kate do weopenitup
Aanenson Sure youcanopen itup for public hearing atthis time
McDonald Okay And what welldo istalk about all theseissuesatthat point Okay Then at
this timeId like toopenup the floor tothepublic and anyone whowishestocomeforward to
make comment Ask questions Pointout anything youfeel ismissing oranythingsuch as that
please do so Step up tothe podium and youknow as always just state your name andaddress
for the record and then address your comments
Tim Erhart Well Illkeep itinteresting
McDonald Please do
TimErhart ImTim Erhart I livein southChanhassen Ihad a quick question about your
projections for needing 37 more acres for localparks Ibelieve itwas in southChanhassen Was
thatbased on the assumption thatBluff Creek golfcourse wouldbe fully developedintosingle
family residential and someofthe other areasdown there or what did youbase the that
projectionon Todd
Hoffman Can weflip tothe chart
Sinclair Yeah what pagewasthat
Hoffman Page 67 Based solelyon thepopulation Wevegot2010 populationor 2030
population of38 000people 15 600 households
Tim Erhart Okay soitwasntbased on anyspecific landdevelopment itself
Hoffman Just population
TimErhart Justgeneral population okay
23
101
Planning Commission Meeting October 2 2007
Hoffman Andthen youruninto7 acresfor every 1 000 people
TimErhart Alright alright Thank you
Aanenson Justtoclarifywhere thosenumbers ofpopulation comefrom Approximately 2
years agoweaccepted system statementsfrom theMetropolitan County which gave an ultimate
build out whichis what Todd Hoffmansspeaking toand what webelieve the population will bein2030Alsoprojecthouseholdsnumberofhouseholdsaswellasemploymentfiguressowe
had toagreewhether or not wethought those numbers were adequateand thats what the model
was builtup from theseprojections thatyoure seeing isbased on that
McDonald Okay Does anyone else wish tocome up and makecomment AskquestionsWellnormallyIwouldgettoslamdownmygavelbutwerenotgoingtobeclosingthepublic
meeting on this soIdontwant tosymbolize anyofthat Itis going toremain open You know
yourefree tomakecommentvia emails letters phone calls and Id say anyone out in the public
thathasanything all youhave todois call cityhall Justtell them the subject matter and Im
sure that they can direct youtothe correctpeople Iwouldhope thatsbeen helpful and therewillbeaseriesoftheseasKatesaidgoingforward
Aanenson Yeah Mr Chair ifIcould just announce for the nextPlanning Commission in 2
weeks from tonight thenwellbe discussing the sewer waterand transportation plan so the City
Engineer willbe with ustotalk about thesewer and water and thenBob will be presentingthetransportationplansoifanybodyhasinterestinthatstayedtunedorattendthemeeting
McDonald Interesting topics all I guesswith that we willhave no furtherbusiness Except
beforeI dothis
Aanenson Approval ofthe minutes
APPROVAL OF MINUTES Commission Undestad noted the verbatim andsummary
minutesofthe Planning Commission meetingdated September 18 2007 aspresented
Chairman McDonald adjourned the Planning Commission meeting at8 30 p m
SubmittedbyKate Aanenson
Community DevelopmentDirector
PreparedbyNann Opheim
24
102
CHANHASSENPARK AND
RECREATION COMMISSION
REGULARMEETING
SUMMARY MINUTES
SEPTEMBER 25 2007
ChairmanStolar calledthe meeting to order at7 30 p m
MEMBERS PRESENT GlennStolar Steve Scharfenberg Tom Kelly Dan Campion Paula
Atkins and JeffDaniel
MEMBERS ABSENT Thor Smith
STAFF PRESENT Todd Hoffman Park and Rec Director JerryRuegemer Recreation
Superintendent JohnStutzman RecreationSupervisor SusanBill SeniorCenter CoordinatorTomKnowlesRecreationCenterManagerandDaleGregoryParkSuperintendent
APPROVAL OF AGENDA Scharfenberg moved Danielseconded toapprovethe agenda
with a correction under AdministrativePresentations changing the date ofthethndcomprehensiveplanopenhousefromOctober16toOctober2Allvotedin favorandthemotioncarriedunanimouslywithavoteof6to0
PUBLICANNOUNCEMENTS None
VISITOR PRESENTATIONS None
APPROVAL OF MINUTES Danielmoved Kelly seconded toapprovethe verbatim and
summary minutes ofthe Park andRecreation Commissionmeeting datedAugust 28 2007
aspresented All voted in favorandthe motion carriedunanimouslywith a vote of6 to0
2007 LAKE ANNCONCESSION BOAT RENTAL EVALUATION JerryRuegemer
presentedthe yearend report on the2007 LakeAnn Parkconcession and boat rental season
notingstaff kept a very closewatch on laborcoststohelp with the bottom line Commissioner
Daniel asked staff if theyaresoliciting bids from vendors asaway toreducecosts
Commissioner Scharfenberg asked about renewal ofthe lifeguard contract ChairmanStolaraskedaboutcorrelationsbetweenpicnicshelterrentalsandboatrentals
RECOMMENDATIONS CONCERNING 2007 2008 ICE SKATING RINK LOCATIONS
Jerry Ruegemerpresented staffs recommendation for iceskating rinklocations for the20072008seasonCommissionerScharfenbergaskedabouttheimpactontheJazzercise classes
which uses awarming house for their classes Commissioner Campion asked staff toexplain
howtheytrackusage atthe skating rinks
103
Parkand Rec Commission Summary September 25 2007
Scharfenbergmoved Campion seconded thatthe Parkand RecreationCommission
recommends thatthe City Council approvethe followingice skating rinklocations for the20072008season
Chanhassen Rec Center Warming House NorthLotusPark Warming House
1 Family Rink 1 Family Rink
2 Hockey Rink 1 Hockey Rink
City Center Park Warming House Roundhouse Park Warming House
1 Family Rink 1 Family Rink
1 Hockey Rink
ChanhassenHills Park
1 Family Rink
All voted in favorandthe motion carriedunanimouslywitha vote of6 to0
CONFIRMRECOMMENDATION CONCERNING FIVEYEAR AND TENYEAR
PARK AND TRAILACQUISITION AND DEVELOPMENT CIP Todd Hoffman reviewed
the recommendations from the Parkand RecreationCommission worksession held on Augustth28andaskedthecommissiontoreconsiderconstructingtheHighway101northtrailgap
Commissioner Kellyasked about the cost ofthe Highway 101north trailand replacement ofequipmentandlobbyfurnitureattheChanRecCenterCommissionerScharfenbergsuggested a
TVmonitor which could display dailyactivities attheRec Center Chairman Stolar asked
progress ofthe monument signfor City CenterPark
Danielmoved Kelly secondedthatthe Park and Recreation Commission amend the ParkandTrailAcquisitionandDevelopmentCIPrecommendationbyaddingtheHighway101
NorthTrail Gap project in the year 2009atan estimated costof 114 000 All voted in
favorandthe motion carriedunanimouslywith a vote of6 to0
RECREATION PROGRAM REPORTS
2007 DAVE HUFFMAN 5K RACE JerryRuegemer reported on thehighlights ofthe racethwhichwasheldonSaturdaySeptember8
2007 HALLOWEENPARTYPREVIEW JohnStutzman provided an updateon thethupcomingHalloweenPartyscheduledforSaturdayOctober27
RECREATION CENTER REPORT TomKnowles presented the reportfor the Rec Center
notingthe hiring ofHollyKaufhold andprogramming updates Commissioner Atkins suggested
providing afacilitator for the partypackages Commissioner Danielsuggested having inflatablejumpingtoysasarentaloptionToddHoffmanremindedthecommissionthattheinitiativewith
the rec centerwas generatingmore incomewithout additional purchases ChairmanStolar stated
its been brought tohisattention thattheresnot enough programming for the 11 to15 yearolds
and the need totarget programming for senior citizens
2
104
Parkand Rec Commission Summary September 25 2007
SENIOR CENTER UPDATE SusanBill gave the senior centerupdate on activities over thesummerandplansforthefall
PARK AND TRAILMAINTENANCE REPORT Dale Gregoryreported on the summer
park and trailprojects Commissioner Kellyasked about winter plans for the southLRT trail the
need for agarbage canbyfield1 atBandimerePark and reseeding schedule for athletic fields
ADMINISTRATIVE REPORT Todd Hoffmanhighlighteditems ofinterest ie public
hearing for the parksand open space sectionofthe comprehensive plan atthePlanningndCommissiononOctober2CarverCountyBlueCrossBlueShieldhealthyinitiative
community fair Lake Minnewashta RegionalParkoff leash dogarea and theannouncement bytheChaskaSchoolDistricttoinstallartificialturfatthenewChanhassenHighSchoolfootball
trackstadium and two practice fields
COMMISSION MEMBER COMMITTEE REPORTS None
COMMISSION MEMBER PRESENTATIONS PaulaAtkins reportedon theprogress ofthe
artscouncil andhistoricalcommittee
ADMINISTRATIVE PACKET Todd Hoffman commentedon a report fromJim Bledsoe on
the success ofthe farmers marketthis past summer Commissioner Danielasked for an updateonthediseasedtreesatKerberPark
Scharfenberg moved Danielseconded toadjourn the meeting All voted in favorandthe
motion carriedunanimously with a vote of6 to0
SubmittedbyTodd Hoffman
Parkand Rec Director
PreparedbyNann Opheim
3
105
CHANHASSENPARK AND
RECREATION COMMISSION
REGULARMEETING
SEPTEMBER 25 2007
ChairmanStolar calledthe meeting to order at7 30 p m
MEMBERS PRESENT Glenn Stolar Steve Scharfenberg Tom Kelly Dan Campion Paula
Atkins and JeffDaniel
MEMBERS ABSENT Thor Smith
STAFF PRESENT Todd Hoffman Park and Rec Director Jerry Ruegemer Recreation
Superintendent JohnStutzman RecreationSupervisor SusanBill Senior CenterCoordinator
Tom Knowles Recreation Center Manager and Dale Gregory ParkSuperintendent
APPROVAL OF AGENDA
Stolar Do wehave anychanges oradditionstothe agenda Any commissionmembers orTodd
orJerry any
Hoffman Justa correction tothedate on the administrative itemfor the comprehensive planthndopenhouseItsnotonthe16ItwillbenextTuesdaythe2
Stolar Thats item number 9 in your packetand thenits the third majorparagraph WelltalkaboutitwhenwegettothatpresentationSeeingnoneotherthanthatonecorrectionmotionto
approvethe agenda
Scharfenberg Motiontoapprovetheagenda
Stolar Second
Daniel Second
Scharfenberg moved Danielseconded toapprove the agenda with a correction underAdministrativePresentationschangingthedateofthecomprehensiveplanopenhousethndfromOctober16toOctober2Allvotedinfavorandthemotioncarriedunanimously
with a vote of6 to0
PUBLICANNOUNCEMENTS
Stolar Iknowwehave a couplethatwe might talk aboutlater but Todd youwant to orJerry
anything
Ruegemer No
106
Parkand Rec Commission September 25 2007
Stolar Okay welltalk about the Halloween later About the stuffthats comingup Whens the
senior center item Wevegot thatcoming up too
Hoffman 7
Stolar Okay
VISITOR PRESENTATIONS None
APPROVAL OF MINUTES Danielmoved Kelly seconded toapprovethe verbatim and
summary minutes ofthe Park andRecreation Commissionmeeting datedAugust 28 2007
aspresented All voted in favorandthe motion carriedunanimouslywith a vote of6 to0
2007 LAKE ANNCONCESSION BOAT RENTAL EVALUATION
Ruegemer ThankyouChair Stolar Last summer did gobyfastagain Wedefinitely had some
nice warm weather throughout thecourse ofthe summer with that which certainly helped ourbottomlineYoualwayswishyoucoulddoalittlebitbetterYouwouldhavedonealittlebit
better but youknowitsnot anythingitisconsistent out atLake Ann I do lookkindofthrough
the expensesand through a lotofthestuff that weve donethrough the years The revenues are
roughly in the same ballpark What we tried todo this yearwas kindofcut back a little bit on
hours and really keep an eyeon laboralotmorethis year What we did too insteadofbeingstopentil700allyearlongAlsowecutthatbackAugust1andclosedat600versus700so
really tried tomakereally an efforttowatch the bottomline asrelated tolabor Hired adifferent
manager this year Really tried tolower really laborcostson thatand Ithink thatdid help our
bottom line as youcanseebythe reportwith the expenditures as relate toseasonal labor Sowe
did its always our goalis tohave a nice service out there forour residentand other beach goersthatusethenotonlythebeachbuttheboatrentalspicnicareasthatsortofthingItsaniceyou
know its kindofa nice little optionfor people thatwant togo downthere and usethe canoesor
paddle boatsand that sortofthing Graban icecream soda that sortofthing Youknow we
continue to reallysimplify the operation Real quickpointofsales Simple type ofmenu
options for people toeasy youknowfor preparation with ourDepartmentofAglicense we reallytrytokeepitinacertainselectionprocessandthatreallyhaskindofhelpedusthroughtheyears
Weve made modifications You know the hot dogs and the mealdeal is really kindofareal
popularthing stillwith people that want togo downand have a quick bitetoeat with kindofa
combination ofchips and asoda itreally seems tobe agoodvalue for people sowellcontinue
obviouslywith that Weve kindofbeen through the cycleofreplacing someequipmentyouknowintheconcessionoperationopenedupin92or93sowerekindofgoingthroughthat
situation where were replacing a freezer here and there We did need counter tops last summer
so werekindofre investing alittle bittomakesure thatitsstillyouknow appealing and
aesthetically pleasing topeople and really functional too with that You know ifweneednew
equipment we seem tobe kindofallocating moniestopurchase and replace sothats worked outgooduptothispointWereallyhadreallyaprettygoodseasonwithpaddleboatsWedidnot
havea lotofmechanical failures with pedals orchains andthatsort ofthing withthat We did
replace someofthe olderwatercraft units thatwe had with a brand new4 person aquacycle A
4 by4 which will reallyhave a long shelflifeas well Alittle bitmore beefier Alittle bitmore
2
107
Parkand Rec Commission September 25 2007
industrialstrength for the rental operation soitreallywent really good Theonlytroublewehad
really with the watercraft was whenthe little micro burst orwindstormkindofcamethrough inAugustthatflippedoveroneoftheAquacyclesthatwehadontopofthedockandthatdiddo
some damagetosomebracketings someseats and thatsortofthing on thatand were goingto
replace and get thatfixed and get thatbackin operation nextspring so We werefortunate that
there wasntmore damagedone tothatbut we really did havea pretty good season with that
Justreplaced some ofthe old equipment Really mechanicallywere in reallypretty goodshapewithpaddleboatssoTheonlytwoweneedtotalkaboutyouknowkindoflookingatdifferent
aspectsofthe operation with labor and that sort ofthing thatreally was kindofthe recurring
theme this year Justtokeep on top ofthings Kind oforderwhat products youneeded but not
have a lotofexcess and really kindofwork through a lotofthosetypeofthings Jenny our
manager out there workedfor uslastsummer aswell soshehad areally goodhandle on thingsHadagoodstaffouttheresoAllandallitwasagoodsummerWeweredownalittlebiton
boat rentals It waswarmer this yearbutwe did have alotmore winditseemslike this year
Whenitgets too windy itsometimes hampersthe boat rental operation where itjust getstoo
windy and it getsbeyond peoplescomfort level alittle bittotakethe paddle boat on Lake Ann
whenitsreal windy Wevehad peopleget tothe other sideofthelakeand get trapped and hadtowadetoshoreandwalkthetrailbackoverandleavethepaddleboatsowevehadsome
retrievals in themorningand someother type ofthings thatwasntthe bestcasescenario but
wellcertainly lookon increasing thatnext year And youcansee the bigchange is really the
wages and hours Hoursworked and surpriseda little bitup on certain things Itseemed like
with youknownatural ingredient costs on Coca Cola products and a lotofother fuelsurchargesandthatsortofthingitseemedliketheproductsandconcessionssupplieshavekindoftakenan
upward stride on thatsocertainly trytobalance all thatand trytomake alittle money aswell as
providing thatservice so The restofthe information is outthere kindofthe dailyfood and boat
sales Kind ofwhat wepaid for labor Food vendor expenses Alotofthosetype ofthings are
includedhere soI would entertain anyquestionsthatthe commission may have
Stolar Jeff want tostart
Daniel Sure Jerryas far as costofconcessions and some ofthe asfar asthevendor expenses
Did youentertainlooking atPepsiortomaybe reduce costsfor nextyear
Ruegemer Yeah wejust went through thatprocess with oursoftdrink vendors We just signed
a brand new5 year contract firstofthe year this year sowere lockedintoCoca Colaagain for
the next5 years We just got donewith a 5 year contract with thatsowe just went through that
process for softdrinks Now Ialsowent through thatprocess withthe kindofthe nuts and boltsyouknowpopcornicecreamforhotdogsallthatstuffwithMidstarandwithWatsonSoIdid
kindofgothrough thatprocess and really Watson wasthe vendor againwith the best pricing
overall
Daniel Okay great
Stolar Dan Steve
3
108
Parkand Rec Commission September 25 2007
Scharfenberg Jerryjust a nothing specific on the concessions butwith regards tothe lifeguard
contract Isthatup this this comingup I thinwedid a2 year
Ruegemer We did do a 2 year and there wasa modeststep increase for 2008sothenthat we
willnot have toreviewthat in2008
Scharfenberg Okay
Stolar Paula
Atkins The Inoticed the concession hours were considerablyless Isthat because ofearlier
closing time or rain
Ruegemer Combinationofearlier closing Sending people home whenitwasntbusy Just
really Icouldntrelay thatmessage on tothe concessionenough that youknow wedontneed to
have double staff down hereand wewant tosendpeople home when wedontneed extrapeople
so wetried toschedule a little bitdifferently tokindofhave some overlap butthen when thebusytimesareoverwithtosendpeoplehomeandthenhaveonepersondownthere
Atkins Lookslike itworkedout well
Stolar One question Do youknow do we do anydeals on like boat rentalswith the sheltersthatpeoplerentorifthatwouldmakeanydifference
Ruegemer We as far as anydeals in tothe discount butwewillset aside boats and thatsoif
youknow your companyscoming downand youarrange itahead oftime we canset aside you
know 5 paddleboats 3 canoes thatsortofthing for ablock oftime
Stolar Do wethink theresanyrelation tothe rental ofthe boatsthenwith that We havent
seenanything noticeable
Ruegemer Yeah because Iguess youknow as itrelates totheboat rentals that stillis includedwithintherevenueswiththatbutasfarasnumbersyouknowitcouldberecordingtypeof
situations too within the concession operations aswell but
Stolar Anyoneelseanyfinalquestions Okay thanks
RECOMMENDATIONS CONCERNING2007 2008ICE SKATING RINK LOCATIONS
Stolar Are yougoing torecommend coldweather this year
Ruegemer We surehope so Thanks again Chair Stolar Iknow on an annual basis we do takealookatthisandkindoflookaheadtoourskatingseasonandwedefinitelyhavedebatedthis
issueto greatlengths in the past Ithink wevereally come toa really goodconsensusas it
comes tokindofgeographic location and warminghouse locations and that sortofthing asto
where itskindoflocatedwithinourcitysoIthink we really did cometoa goodsituation last
4
109
Parkand Rec Commission September 25 2007
yearwith the recommendation ofkindofflooding ChanhassenHills in thatkindofsouthern
Chanhassen Iknow thats been the commissions desire for anumber ofyearstohave somethingdowninthatsouthernhalfofChanhassensouthofHighway5Therecommendationwasmade
lastyear and ultimatelyapproved byCityCouncil toinclude the Chanhassen Hills skating rinkin
that in ourseasonal operation With the warm weather we certainly didnthave that opportunity
lastyear Per ourskating rinkpolicy thatbyacertain dateitwas too warm we didntget started
on it Therefore itwas kindofpulled for thesummer or for the winter season Sowewere kindofinthatsituationlastyearandIthinkpeoplewerelookingforwardtothatskatingrinkinthat
locationagain and thatcertainlyis Iguess myrecommendation tothe commission tonightto
take a look atkeeping that skating rinkinthe flooding schedule toserve ourneeds and residents
down in thatarea ofChanhassen Andthen obviously thentokeep the other warming house
locations thatwevehad inthe past thatreally kindofrepresents kindofthe ChanhassenpopulationreallyacrosstheboardandallpointsofthecitySoitisstaffsrecommendation that
the Parkand RecreationCommission recommend tothe City Council toapprovethe following
ice rinklocations and schedule herefor 2007and 2008 That would include the Chanhassen
RecreationCenter warming house with awarming house location Thats onefamilyrink Two
hockeyrinks City CenterPark with a warminghouse Portable warminghouse with that OnefamilyrinkandonehockeyrinkNorthLotusthathasaportablewarminghouseOnefamily
rinkand onehockey rink Roundhouse Park itwould be the round house buildingitself for the
warming house Onefamily rinkand then Chanhassen HillsParkwith one familyrink
Stolar Tom anyquestions
Kelly No
Stolar Paula
Atkins Sothatwould be like last year itwouldbe on the schedule tobe floodedifconditions
were allowing Okay
Scharfenberg Do we everhave a or do youforesee a problemwith the Jazzerciseout atthe
warming house and usingtheir rink Is that going tobe an issuethis year
Hoffman Tom cantalk about that
Knowles No the Jazzercise coordinator hasknown from the very beginning when webrought
themout there last March that we wouldbe revertingback tothe warming house operationscomeDecemberWereworkingonfindingherspaceinsidetherecreationcentertorunher
program this winter
Hoffman During the warming house time Thentheyllgoback out
Knowles Right
Campion The numbers for the userstotals coverthe howdo they getthose numbers How do
theytrack that
5
110
Parkand Rec Commission September 25 2007
Ruegemer How do they track that
Campion Yeah isthat just from when its
Ruegemer Yeah ifyoulook atthe totals thosewere actuallywere skating rinkattendantswhile
on duty
Campion Okay
Ruegemer And then youknow on a kindofhourly orkindofthroughout thecourse oftheir
scheduled time we have differentsheets thatthey fill out and they recordnumbers
Hoffman And that san actual head count Thats notextrapolated out for all the other times
right
Ruegemer That sactual headcount
Hoffman Yeah soitsmore than that
Ruegemer Andthats just while attendants were on duty
Campion How about lighting Imean what arethe hours ofthe
Ruegemer Theskating rinks areopen4 00 to9 00 p m Monday through Friday and then
10 00 a m to9 00 p m on Saturdays andthen 1 00 to7 00 on Sundays Sotheyre open a fair
amount during the skating season Andthe lights areturnedon bythe attendantswhiletheyreonduty
Campion Okay
Hoffman Alltheselocations have lights Some arehockey lights Some arejust for pleasureskating
Campion Andthe light hours follow the attendanthours as well
Ruegemer Yeah pretty much when thelights are one for the most part when youknow its notrightat400butshortlythereafterduringthattimeTimeframesoyeahlightsareonmostofthe
time when theyre on duty Ofcourse not in the Saturday morningtimeframe but
Daniel Ivegot two questions Arethere anyother parks within thatwe have that have hockey
rinks already boards thatarenot beingused Are hockeyrinks in placethat arenotbeing usedrightnow
Ruegemer No There arenot anymore hockey rinksthat are available
6
111
Parkand Rec Commission September 25 2007
Daniel Okay because the onlyone andagainbecause I realizeits not technically what about
Cathcart Would thatbe does Shorewood flood that
Ruegemer Yep
Daniel Okay Is thatsomething thatwereabletolistthen orshould we list Or is availableto
pseudo sortof
Ruegemer We haventin the past but
Hoffman List itin our brochureand just makesure itsnoted that its owned and operatedby
Shorewood
Daniel That might be agoodidea
Stolar Anything else Okay Theresa request here for ustomake a recommendation orvote
on the recommendation Do Ihave a motiontoapprovestaffsrecommendation listingtheattachedrinksasbeingtheschedulefor20072008withJeffscommentthatwewouldpublicize
the availabilityofCathcartPark
Scharfenberg Imove toadopt staffs recommendationfor the2007 2008 ice rinklocations
Campion Second
Stolar Okay Moved byCommissioner Scharfenberg SecondedbyCommissioner Campion
Any other discussion
Scharfenbergmoved Campion seconded thatthe Parkand RecreationCommission
recommends thatthe City Council approvethe followingice skating rinklocations for the
2007 2008 season
Chanhassen Rec Center Warming House NorthLotusPark Warming House1FamilyRink1FamilyRink
2 Hockey Rink 1 Hockey Rink
City Center Park Warming House Roundhouse Park Warming House
1 Family Rink 1 Family Rink1HockeyRink
ChanhassenHills Park
1 Family Rink
All voted in favorandthe motion carriedunanimouslywitha vote of6 to0
Stolar Lets hopefor goodweather
7
112
Parkand Rec Commission September 25 2007
CONFIRMRECOMMENDATION CONCERNING FIVEYEAR AND TENYEAR
PARK AND TRAILACQUISITION AND DEVELOPMENT CIP
Hoffman Thank youChairStolar membersofthe commission First ofall Iwant toagain
compliment youon your work session effortatthe last when wegottogether and went through
theseitems Ithought itwasvery well puttogether and an effective waytocomeup with a not
onlya5 year buta10 yearCIP This evening what staffis requesting is thatyouconfirm yourrecommendationsthrough20082012whichis4000020worthofinvestmentsAndthenthe
last halfor the second halfofthe 10 year 2013 through 2017 is 1 665 000 Sowith thosetwo
numbers inmind its easy toseethatwere front loadingmanyoftheseimprovementsin our
CIP Theselarge trailimprovement projects parkprojects many ofthe expendituresfor larger
itemsin the 10 yearscome in the firsthalfofthattime period SoImasking youtoconfirmthoseandtheninadditionImaskingyoutomakeareconsiderationofyourdecisionfromlast
month and that concerns the Highway101 north trailgap Its a 1 400 foot section or quarter
milesection ofproposedtrailthatwould connect Chanhassenstrailsystem toboththe
Minnetonka and Eden Prairietrailsystem locatedin the immediately northeastcorner of ourcity
and ata ifbuilt we think thepedestrians the safety ofpedestrians and recreationalbicyclistsutilizingthatcorridorwouldgreatlybeimprovedBecauseweknowtodaytherearepeoplethat
aretakingthe corridortothe northorcomingfrom the south and thenthey have tonavigate that
gap that is in there Forthoseofyouwhohave taken a look atthiscorridor youcanseetheresa
curb cut already in place tothenorth attheintersection ofthe three cities ready tobe connected
and then wehave atrailwhich stops atPleasantView currently and 101 SoitsstaffsrecommendationthatyouconsideramendingtheParkandRectrailacquisitionanddevelopment
CIP byaddingthis section a project inyear 2009 and that wouldtake withthe other two gap
projects Bluff Creek and Pioneer Trail and included atan estimated costof 114 000for that
trailsection
Daniel Thats agoodidea Toddand thenpart ofithad todowith what Ivenoticed driving
home every daythroughthatcorridor and itstuckout tome itactually cametomy attention a
couple weeksago where Inoticed a woman walkingdown really through theditch Then I
noticed another person the nextdayand the nextdayand literally every dayIveseen somebody
walk throughthere and over thedeaddeer carcasses lying on the sideofthe road right nowaswellSoIguessitisacorridorthatwouldbeusedagainbasedoffofjustanobservation
recently here Andagainitsa shortperiod oftimebut Imsure its more ofthenorm so I think
its somethingwe certainly should givesomeconsideration to
Hoffman Verynearand dear toyour heart
Campion Yeah Ihave no specificcomments Its justdirectly in my back yard but
Stolar Are yougoing torecuse yourself
Campion Iwill recusemyself fromcommenting
Stolar Steve any About any and ifyouguys have comments on the general layout Any
questions Wecancircle backaround Paula
8
113
Parkand Rec Commission September 25 2007
Atkins No
Stolar Tom
Kelly Why isitsoexpensive Thats just a small area Why is itsoexpensive It lookspretty
flat Are there easements youhave to
Hoffman No I dontbelieve so Itsactually in line with all ofthe othertrailprojects wevegot
going on in town Ifyou we usea perfootestimateand its kindofonce itsengineered and bid
out it may comeinunderneath thatbut
Kelly Okay And theres no way this isntourproperty theresno way youcanget Minnetonka
and or EdenPrairie tohelp with the costbecause itsgoingtobenefitthem asmuch asits going
tobenefit Chan
Hoffman No
Kelly Itdoesntquite work thatway
Hoffman No What theywould say we built ittoyour border
Kelly Yeah okay Do weneed tomove stuff around then If we were torecommend do we
needtomess around with some ofthe other thingsthat
Hoffman No Imjust recommending youadditto2009 asan additional 114000
Kelly Okay
Hoffman And that youknow that number maycome down Itmay actually go up Itis
relatively flat butthere might be some retaining wallsin certain sectionsofit Depending on
howits designed If youthink about the remainder ofthe101 trail thatwas just near 1 million12
Kelly I thoughtitwas 13 Okay yeah It was a lot It just seemed tobe such a small
relativelyflat piece ofland compared towhat the other 101 trailand there was a lotofditches
there I wasjust curious why itseemed tobe somuch That wasall Ihad
Stolar Did youwant totalk about therec stuff
Kelly Oh yeah Iwas curioustoo on Idontremember talkingabout the recreation Goingback
tothe CIPlayout Ido not remembertalkingabout the rec center fitness equipment orthe lobbyfurnitureDidwebringthatupatourworksessionornot
Hoffman No we addedthat as an administrative additions and thosearenot comingoutof410
Theyre comingout ofcapital
9
114
Parkand Rec Commission September 25 2007
Kelly Okay
Hoffman SoI spoke with City Manager Gerhardt and working with Tom Knowles and thenour
Finance Director Greg Sticha and the lobby equipment isin needfor replacement Its 12 years
old and we have a bidin for just under 18 000plustaxes sojust under 20 000for thelobby
equipment Andthen the fitnessequipment we needtoaddnewequipment Wereproposing10000forthenext5yearsforatotalpackageof50000toreplacetheoriginalequipment
thats in the recreation centersince itopened
Stolar Iremember we talkedaboutthat thatmightbe somethingwewantedtodo but we didnt
have aspecific number Icantrememberwhen we discussed that we wantedtomaybe wewantedtolookatreplacingequipment
Hoffman Yeah And ourrecommendation againis 50 000 10 000a year
Scharfenberg Ihaventbeen out tothe rec center for a whileand soexcuse me for but do wehaveaTVoutthereorflatscreenthatlistswhatsgoingoninalltheroomsforeverydayout
there Wouldthat be something that wouldbe Imean the onlyreason Iwas just thinkingabout
that At the community Chaska Community Centertheyve got anice one Displaysall the
things thataregoing on thatday youknow byhour That would be a niceperkifwe could get
Iwas thinkingabout the furniture If were goingtoupdate that You knowthat wouldbe a niceadditionifwecoulddosomethinglikethat
Hoffman We havea TV in the lobby and2 TVs in thefitness room so
Scharfenberg Right But Imtalking about something on awall rightasyoucomein and youknowConferenceRoomAYouknowjustlistseverythingWhatsinthegymnasiumsYou
know itd be nicetohave somethinglike thatifwe could dothatinthe next yearor2 years
Hoffman Iagree with that We could also doa lotofniceadvertising on it
Stolar Put down Halloween
Daniel Other community notices
Stolar Yeah absolutely
Daniel News aswell
Stolar Seniorcenter items Anythinglike that
Daniel Fantasticidea Would wewant toput that inthe CIP
Hoffman Wellwork with ourfolksin ourinformationservices department seeifwe cantget
that Mightbe abletowork through ourcable folks
10
115
Parkand Rec Commission September 25 2007
Stolar But Imean for the equipment itself
Hoffman Yeah they couldbuyitaswell
Stolar But yeah youreright ifyouregoingtoupgrade the lobbythere youmight aswelldo it
right Ihad a couple questions on the monumentwe had talkedabout For out here LikethesignWasthat
Hoffman It wontcomeout ofourbudget
Stolar Okay because we didntknow atthattime We saidwed like tomake sureitsthere butthecityhasagreedokayAndthatsgoingforward
Hoffman Well its beingdiscussed
Gregory Wellget youthe Hallasign
Stolar On thetrail wehad talked about putting the Bluff Creekand Pioneer Boulevard together
becausethere some value potentially indoing thoseas one Doesthe 101 north fit intothat
Likedowe bid themout together
Hoffman You bid themall asoneproject all 3
Stolar Okay Sothats where we potentially could get somesavings becausewellget a bigger
contract
Hoffman Yeah
Stolar That wouldbe in 2009 That will be ourbiggestsingle year right
Hoffman Correct
Stolar Ofexpenditures
Hoffman Yep
Stolar But theres valuein getting itall done Andtheres no drainon city staff for havingso
many big trailprojects because wellbid itout Okay
Hoffman No Actually in the long runtheres abenefit becausedoing 2 3 trailprojects is no
differentthan doing2 at once
Stolar Now did we talk about theLyman Boulevardtrailimprovements Do weknow that
thoseare going tobe both in thoseyears Whatwas the one thatwe said we werentsure what
year itwould comein
11
116
Parkand Rec Commission September 25 2007
Hoffman Well yeah the Lyman That may be paid out in 2009 2010
Stolar Okay Thatswhat Iwas okay
Hoffman Andthe allocation the half the million dollarsmay fluctuate Theyregetting closeto
the PhaseIconstruction Butits moving forward That s thepositive thing
Stolar Good
Hoffman Everybodys finding out thatroadsare alotmore expensivetoday than when they or
15 yearsago
Kelly Can Iask onemore question Is the Arboretum path still on schedule for this year
Hoffman Its on schedule for this year Itwontbe doneuntil nextyear Andtheressome
timing issues with the construction plans Bridge specifications So infactI just talked totheengineertodayIdontwantthemtomoveoffthesiteandthenhavetoremobilizeandso
because astheyregrading the building padandonce they get toa certain point they have to
move off thebuilding pad and get intothe trailand start doing thatwork They get too far along
thenyouhave tocleaned up site nextspring You cantbuilda trailout ofthe back ofthis new
buildinglocationsotherellbe constructionprobably through June orJuly ofnext year Its afairlyextensiveproject
Kelly Okay
Hoffman Youllseelotsofribbons becausewere getting lots ofphone calls and peoplestoppingbytheofficeTheywalkdownadeadendtrailandnowthereslotsofprettyribbons
here wherewe have alotofpeople walk intothe office
Stolar And then Idontknowifyouhave the 2013 halfway in 13 through 17 Its split into
Itsatthe end of2017 Whatwas ourprojected balance then
Hoffman Projected balance
Stolar Yeah
Hoffman Ihave thatcomputation here
Stolar But we stillwould have some left overfor some we stillhave the reservefor when if
somethingcomes an opportunity comesup We have 400 000 slated here
Hoffman Yeah Imgoing tocheck the balance Its stillright around amilliondollars
Stolar Okay thats right
12
117
Parkand Rec Commission September 25 2007
Hoffman 3 million excuse me
Stolar Okay great Any other
Daniel Iactually had one more question and its maybe not related tothis but where arewe at
with the Veterans Memorial
Hoffman Outhere
Daniel Yep
Hoffman Veterans Memorialis coordinatedbythe American Legion The City cannot spenddollarsorinvestdollarsforwarmemorialswarmonumentsbystatelegislationsowemetwith
the Legion They agreed totakethatinitiative over Theystarted afundraising campaign Its
gone fairly slowlybut theydo havesome cash
Daniel Okay Iwas just curiousiftheres anyprogress on thatat all
Hoffman MarkUndestad and his developmentcompany donated 10 000
Daniel Fantastic
Hoffman Yeah its somethingtotalk up when youre aroundthe community Talk to
Stolar Okay soTodd in this listof20 2008 2012youllget approved youlladd the 101 in
here
Hoffman Correct Thelist asyouverecommended doesntchange unless youmakeany
corrections and the addition would onlybe added ifyoumakethataddition
Stolar Okay Which is whatyou recommendedin this motion
Hoffman Correct
Stolar Alright Any other questions If not canIhave amotion ofstaffsrecommendation that
we take ourCIP thatwe worked through in ourwork session in ourlast meeting andadd toitin
2009 the Highway 101 northtrail gapproject Do we have a motion
Daniel Motion toapprove
Stolar Moved and seconded by acombination ofcommissioners Daniel and Kelly Any further
questions
Danielmoved Kelly secondedthatthe Park and Recreation Commission amend the Park
and TrailAcquisition and Development CIP recommendation byadding the Highway 101
13
118
Parkand Rec Commission September 25 2007
NorthTrail Gap project in the year 2009atan estimated costof 114 000 All voted in
favorandthe motion carriedunanimouslywith a vote of6 to0
Stolar Okay And so that goes before theCity Council when
Hoffman You know Ithinkitwill be December
Stolar Great Okay wellwhen itdoes ifyouneedus more attendance tojust answer questions
RECREATION PROGRAM REPORTS
2007 DAVE HUFFMAN 5K RACE
thRuegemerThankyouWejustcompletedour8 Annual Dave Huffman Race on SaturdaythSeptember8Anabsolutelybeautifulmorningwehadfortheeventthankstoeverybodywho
was involved inthat with the commissionand we did have probably about 320 people registered
We had about 290some registered and about 30 people whodidnthave race bibs Were notsureexactlyhowthathappenedbutitlookedlikethenumberwasmorearound320thanother
numbersthatwerereported earlier with thatso Upalittle bitwith that Ithink peopleare
getting used tothe hills ofthe course certainlywith thatand itbuilds character Ithink That little
challengeso Good thing we had great help from not onlyourdepartment but certainly the
public works department Carver County toprovide really a safe running course forourparticipantssowealwaysworktogetheraheadoftimeandreallycameupwithsomenewideas
toincrease the flowoftrafficand minimize the impact on ourbusiness community for our
downtown area soitalwaysisourgoaltohave lessimpact on normal every daySaturday
activities Goingtothe bank Goingtoget a cup ofcoffee thatsortofthingsoIthink wehad
probably downtown closedless thana halfan hour sothatcertainly wasourgoal Thatsreallyoneofthereasonswhywerunthecourseacertainwaytogetpeoplethroughtownandgetit
opened up right away againso Hadhelp againfrom the Chanhassen Boy Scoutswith that
They certainly providesome very nicenumbers ofvolunteerswith that One ofthe things that
really really helped usout this year wasRidgeview MedicalCenter donated 2 400 topayfor
the entire shirtcost with thatand we were more thanhappy togive themthe front and centerlogoonthebackoftheshirtwiththeRidgeviewMedicalCenterlogosothatsverymuch
appreciated That really helped usout tremendously tonumber one allocate moremoney to
needy charities within ourChanhassen area and alsoput a little money back inthe back tokind
ofsustain usfor future years Soitreally helpedus out tremendously You cankindofseethe
allocation amounts down in the memo itself We gave 1 000tothe Chanhassen AreaChamberofCommerceforstudentscholarshipwhichisreallyagooddealTheydid6scholarshipstotal
lastyear Theyre hoping for 8 this year Or I guessin 2008 Andcertainly the Dave Huffman
ScholarshipFund isup to 1 000 in Davesfor that sowepresenteda check thedayofthe event
so wehad a chamber representativethere toaccept the check We were very happy and very
proudofthat Andwe also gave wekindofchangeda little bitaround alittle bitthis year Weuppedkindofouramountsandgave450totheBoyScoutsagainthisyearandthenwealso
changed itaround and gave somemoney totheFeed My Starving Childrentohelp out poverty
strickenfamilies and that sortofthing withthat sowere kindoflooking for maybesomenew
directions on where togo tokindofallocatethe money We took a breakfrom theArboretum
14
119
Parkand Rec Commission September 25 2007
this yeartoreallocate somemoney todifferent areasso Werealways looking for new
directionstogo We try tochange things up a little bit and kindofspread themoney around alittlebitwiththatsoLookingatsomedifferentthingsnextyearwiththatcertainlyalways
looking for newideas from the commissionand alsoparticipants sothatthe peoplethatwere
involved with lookingpossiblytochange the time herearound a little bitsoits alittle bitmore
instant results with amicro chipversuskindofthe traditional waythatweve done it The
traditional way thatweve doneitis avery inexpensive way todoit Its onlyabout 300 350 forthewholeprocessforusandwerekindofintheprocessofinvestigatingisitworthsteppingup
but its apretty slick way ofdoing the chip racing with that and youcrosses the finishline and
your time isrecorded We canreally turn thataround so its versus 2 or 3 4 days afterthe event
and youre stillwaitingfor your timeto be posted It canhappen really the dayofor the day
after soweregoingtoinvestigate that Werealsolooking topossiblyadding ahealth faircomponentofsomesorttokindofbuilduponthesuccessoftheeventandtoaddkindofnew
differentthings toeducate people on health and wellness and but yetstillkindofkeep itkindof
afamily funcommunity event so Justlooking ahead tonextyear Thats kindofwhatwere
lookingat Backin your packet some oftheoverallrace resultsand thenfromour kindofour
race results and thenalso the race breakdown results
Stolar Okay thank you Questions Paula
Atkins No questions Iliked the Vikingsguyinthe costume That was pretty cool
Stolar Steve
Scharfenberg No questions
Stolar Dan Tom Another great event Thankyou
2007 HALLOWEENPARTYPREVIEW
Stutzman ThankyouMr Chairman The annual city or the annual ChanhassenHalloweenthpartywillbeheldthisOctober27outattheRecCenterfrom530to730onceagainthisyearThiswillbemyfirstHalloweenPartybutmypredecessorsputtogethergoodfilessoImhoping
tobuild on itand carryon what theyvedone as well The entertainment willbe slightly different
this year Ivegone back toa Touch ofMagicwhoweve usedin past yearsand theyve
recommended a showthats aunique performer Kind ofaclown butrides unicycles and
juggles and does alittle bitofmagicand itsoundslike a very very entertainingshow VeryfamilyorientedandoneofthekeycomponentsIvebeenlookingforisaudienceparticipation
and from the from what theyhave said he does agreat job They also gavemehiswebsitelink
and Ilooked athis and a coupleother entertainers web sites and this isthe one that Ithink is
going tobe thebest entertainerfor that evening Hesgoing toput on abouta halfhour 40
minute showstarting at6 30 And then wewill alsodo a trickor treating again ThehayrideswillbebackTheHalloweengamesImlookingtopotentiallyaddonemoregameinthegym
so itkeeps the linesdown just a little bitmore As always thevolunteersare ahuge pieceofthis
Ive already contacted theChaska Key Club and theyare working on seeing iftheycanhelp us
out again They actually have a newcoordinator or staff representative so theyre trying toget
15
120
Parkand Rec Commission September 25 2007
settledin as well and soweve been playing alittle bitofphone tag but shehasexpressedinterest
in helping usout again Just needs torunitbythe Clubas well and actually the community isthalreadyreachingoutIhadacalltodayfromamotherwonderingifher7gradedaughterand
their friends couldcome out and help us out and sothe volunteerskindof have been coming to
us as wellsothatsa verygoodpiece and actually with volunteersIknow some ofyouguys have
beenout there in thepast JustsoIcanget a generalidea wouldanyofyoube interested in
joining usout there tohelp out again this year Iwilllookintothata little morefurther indepthbutjustkindofageneralheadsup
Stolar Ifyou canjust send usan email
Stutzman Okay And we arelooking toget about 400 500attendees between parents and kidsagainParentsgetinforfreebutthechildrenare4aheadandwerealreadygetting
registrations for that as well Solooking forward tothat
Stolar Comments
Atkins Whats the charge
Stutzman The chargeis 4 perkids Theadults get in free
Atkins Is there preregistering
Stutzman Yep theyare theydo preregister and from theones Ivealready taken they seem to
like that idea better They like being able toshow up thenight ofbut the ones Ivetalkedtosay
youknow its somuch easier If Ipre register then Iknow Imreadytogo and Idonthave to
worryabout waiting in line Icanjust get checked in sowe will Iam accepting preregistrationsandtheyrestartingtocomeinalready
Stolar And thenjust comment Ivemade beforeabout other things Justso Iknow wehave to
make somepurchases here andwehave somecompanies locally thatgiveusa lotofsupport for
ourevents and thoseshouldbe comfortably tryand precipitate Any otherpoints Alrightthanksandlookingforwardtoafunevening
RECREATION CENTER REPORT
Knowles Well thank youMr Chairman Withthe comingoffall the recreation centerreverts toitsfullandextendedhoursofoperationAsyouknowduringthesummerwereduceourhours
and actually close up for a 2 week period leading intoLabor Day but we aregeared up and
running atfullschedule now Wellbe runningthat schedulethrough Memorial Day ofnext
year Ive listedthose hours for youin my report The staffingattherec center needs toreflect
ourextended hours Weve bulked up ourstaffingsomewhat Thebig development there isweveaddedHollyKaufholdtoourstaffHollywasaninternwiththeParkandRecdepartment
this summer and shes been just terrific out atthe reccenter Herknowledge ofthe department
procedures are thesoftware that we usefor registrations and everythingisvery extensive so
shesbeen a very welcomed addition Ourprogramming the fall program season hasbegun
16
121
Parkand Rec Commission September 25 2007
Our biggest programsareinthe preschool sports which this seasonis fall soccer Outdoorsoccer
and the Dancefor Funprogram Ourregistrationsarepretty muchconsistent with pastyearsNicoleourdancecoordinatorhasindicatedthatactuallyshesenrolledabout225studentsthis
fall Normallyshelikes totarget about 200 sowere up a little bit there sothat sgood Weve
had a little bitof aspike in ouryoga class for somereason butits very welcomed We normally
runabout midtoupper teensin ouryoga classand were up toabout 26 students this fallsession
so goodtoseesome more peopleon board John hasalready talked about theHalloween PartyOurfirstspecialeventcomesupalreadythisFridayattheRecCentertheBarnyardBoogieIts
sort ofafallprogramfor preschool crowd Butitsbeen avery successful program Wejointly
sponsor thateventwith the City ofChaska Wenormally anticipate having about 300 400
participantsin thatsoitsa big eventfor usout there but weshould be readytogo Wevegot
everythinglined up Hopefully wellhave someniceweather sothe petting zoocanbe outsideHopefullywewonthavetobringtheanimalsindoorsbutwehaveinthepastItsbetterifwe
dontsowerehoping for someniceweather Facility notes As mentioned we closed up for a
couple weeks before Labor Day We did somecleaning We did somere surfacingofthe floors
The placelooks pretty nicerightnow We talked about some ofthe capitalimprovements with
the furniture improvements in the lobbywould really really present anice imageI thinkifwedidsomethinglikethatsohopefullythatwillgothroughReservationsformeetingsandparties
Ive noted a lotofactivity so far this fall Checking ourscheduling calendar Ivealready had to
tellseveralpeople that sorry thedate that yourerequesting and thetime is already booked soits
goodtoseethat wehavesome interestin ourmeeting rooms and partypackages that were
bringing on Finally the lastsection in myreportis thestrategic plan of2007 Just like tohighlightacouplethingsthereOneisthatpartypackageconceptWerolledthatoutinthe fall
Connection Basically whatwere providingis a freehour ofpartyroom rental with 1 hour of
gym time Werealsoemphasizing a little bitbetter whatexactly we canoffer in the gym Its
finetosay youcanrent the gymbut its also probably a goodideatosort ofemphasizewhat we
canoffer soin thatpartypackageweve emphasized basketball volleyball dodge ball and theothersortofactivitieswecanprovideforthepeopleIvebookedseveralofthepartypackages
already Wevehad a lotofquestions comingin about itsoImvery hopeful thatits going to
help drum up somemorebusiness out there atthe recreation center The other areaId like to
sort ofhighlightis number 5 thecorporate sales program Again Ivebeen working with Holly
on this She had spent sometime this summer as part ofher internship working with updatingthesponsorshiplistthatthecityhaswithseveralofthecompaniesaroundtownWhatwere
leaning toward doingin a corporate salesprogram is toapproach some ofthese companies that
have been active sponsors in ourprograms and offer themthe opportunity toprovide discounts
for their employees for punchcard purchases Were looking atabout a 25 discount for their
employeesand againwith the idea ofhopefully stirring up some more trafficthrough thebuildingoutthereThatsaboutitSofarsogoodinthefallWerehappyWerepleased with
what were seeingsofar solooking forward toa goodseason
Stolar Questions for Tom
Atkins For thepartypackages have youeverthought about offering a facilitatorfor parents
included with the gym You have somebody that would organizethe games Anybody on staff
that youhave that could do that or
17
122
Parkand Rec Commission September 25 2007
Knowles We have several peoplethatcould do thatsortofthing We have not broughtthat
ideaforward Thatsa goodidea We do have people on staff that coulddo that
Atkins That would be very valuableI think
Knowles Goodidea Wellcertainly explore that
Daniel Tom anyconsideration orhasthere been anythought on looking atsome ofthese
inflatablejumping youknow thatAtoZRentalssellsthem Is that somethingthatthe City
couldpossiblypurchase and rent out during theseparties You know theMoon Walk typeof
thing
Knowles Right
Daniel Ittakes a relatively small space tostore itbut
Knowles Right right Thats part oftheproblem Ithink a lotofthat stuff those sortofthingssortoflendthemselvesbetterIthinktooutdooractivitiesMorespacetosetthemupandtear
them down Getting them in and out ofthebuildingmight present someproblems but
Hoffman Oneofthe goals wetalked about with all the initiativeswe wantedtomakesure we
wereusing thingsthatwe currentlyhad becauseoneofourchallenges atthe recreation centeristogeneratemorerevenuebutwithouthavingtospendadditionaldollarssowehavegymsWe
have theseother activities thatare available ifthatswhat youreinterested in Ifwe have to
spend 7 000for a jumpingcastle its going totake6 yearstomake thatback so
Daniel Ididntadd onehowmuch theycost but
Hoffman Yeah itd be expensive
Daniel The onlyreasonI bringitup is theschool that mysongoes to they rentout their gym
for birthday parties and just everybodys birthday partynowattheir school isatthatgym and itsbeenahugerevenuegeneratorforthemButparentswillgotoAtoZtogorentoutjustabout
every time or whatever rental place hasthesethingsand bringthem in Set themup themselves
becauseitssomething that canbe done bythe parents Its a fantastic waytoput the mess
somewhere else besidestheir ownhouse butitsbeen Ithink asfar as promotional for birthday
packages especially with kidsand some ofthe amenitiesthatarealreadythere thatToddyouhadmentionedminuswhateveritmaybeIthinkitsafantasticideaEspeciallyfortheparty
sideand especially for folksI think on childrens birthday parties Its just about everyweekend
nowthe gym isnowbooked Over attheir school and thatsjust theirsmall little school
Ruegemer You just putitright down on the gymfloor
Daniel Yeah
18
123
Parkand Rec Commission September 25 2007
Stolar Iveseen that other places where they just pop in which nothing wouldprevent people
from doing the same thing attherec center
Daniel Bring itthemselves no itdoesntdoanything
Knowles Weregetting on asuggestion once itskindoffunny actually somebodywantedto
put adunk tank in ourgym
thStolarWaterAlthoughhavingoneoutatCityCenterParkforthe4 ofJuly wouldbe fun
Getthemayor to sit in it Raisemoney Ive done itmanytimes For charity Wehave doneit
many timesbut itd be fun itd be agoodway for somebody to raisemoney
Hoffman I watchedDonChmiel go down many times
Stolar Justone quick question Tom It was brought tomyattention that someone was
concerned thatwedonthave enough opportunities for the11 to15 year olds That theres you
know we have the skate parkwhich isthere but atthe reccenter specifically itwas mentionedyouknowweretryingtolookforprogrammingopportunitiesforthe11to15yearoldsinthe rec
center And youknow Iseehere wehave somethings but not really a lotcompared tothat so so
Idontknow ifweatsome point want tobrainstorm on that but thats an area thatisofconcern to
them
Knowles Ithink thats traditionally been a challenging age for anybody thatengages in
recreation program
Stolar Or parenting
Knowles Yeah Itsa tougharea Itsa tough agegroup toreach
Stolar But iftheres ideas on and Iveactually Iforgot to Iwas going toactuallyask this
person tocome in onetime tothe commissionand bringsomeideas but Illcontact her and
suggest thatshesend some ideas
Ruegemer Chair Stolar just tokindofletyouknowtoo wehave kindofa proposal coming
from the DinnerTheater They wantto partner with the City on doing a kindof akaraoke night
out atthe reccenter on Friday nights sothat letter is will be comingintoouroffice here
probablyin the nextweek or two
Stolar Great And that targetsthatkindofage group Well open tomorebut
Ruegemer For nextspring
Stolar Excellent Tom youwere going toask a question
19
124
Parkand Rec Commission September 25 2007
Kelly Iwas just wondering Jeffwas talking about youwereasking the reccenter to
coordinate with soifitcosts 100 torenta jumpingthing from AtoZmaybe on therec centercharges125andtheydoallthecoordinationandtheydgetalittlefeethemselves
Daniel Yep Part of itd bepart ofthe package Iagreeasfar as goingout and actually
purchasing it Ihave no ideawhat theycost but asfar asworking with parents and working with
Kelly Havea relationship with Aand Zand then havea little service tostayon top ofthat then
Daniel Yep
Knowles Sure check the prices out See what we can do
Stolar Justtospend a little time youknow weall sataround and had that strategic planning
session and its goodtoseethat things are youre following up on themand thatthings are
actually occurring and going well sothank you
Knowles Theres some goodand somebad Most ofthethings are going well Thepersonal
training is its not happening but theres progress in just about every other area soyeah
Campion Howdo the ratesfor the personal training comparedwith
Knowles Well ourratesare very very competitive I just think thatthetype ofperson thats
interested in personal trainingis probably alsothe type ofpersonthatsmore likelytojoin a
health cluband werejust not attracting thatsortofclienttothe rec center
Stolar Have youtalked toSusanabout maybe targeting the seniorcenter population and havingspecializedtraininginthatregardMysisterwasjustinherhealthclubnowhasspecialclasses
just for senior population which shes getting towards
Knowles We havediscussed ways ofgetting more seniors out totherec center Thereseems to
be a little resistance Littleterritorial kindofissuesthatyouknow the senior centers here ThereccentershereandneverthetwainshallmeetkindofthingWeretryingtoworkwiththatand
trying toget overthatalittle bitand
Hoffman Its along ways out That rec center
Stolar Well Imean just offering youknow seeing ifthere is apersonal trainer whospecializes
in thattype offitnessand working for promoting itthroughthe senior center
Kelly Iwas talking tomy mother whois asenior citizen herself Abig gapin Lifetime is the
lack ofsenior citizen classes and there have been numerous numerous suggestionsatLifetimethattheyshouldhavemoreofthosesothatcouldbeawayinforthecitycenterfortherec
center Onemore thing I just wanttosay Ithought Paulas ideaabout having someone thereto
coordinatethe partieswouldbe great because I thinkas a parentI wouldpayup to 25 00 tolet
someonerunmy kidsbirthday party soIdonthave todeal with adozen kids Ithink theres
20
125
Parkand Rec Commission September 25 2007
definite value there in having that And an extrafee wouldbe appropriate for that but Ithink
youd get a lotofparentssaying all Ihave todo is sit around for 2 hours and with the pizzayouvegotherethisisgreatsoIthinkthatwouldbeaniceniceadditionButthanksfordoing
the party That wasa big thing wehad talked about when we had ourmeeting and thanks for
doing thatand its greattoseethatyoure getting somuch positive feedbackabout that
Knowles Thankyou
Stolar Okay thanks
SENIOR CENTER UPDATE
Bill Thank you As indicated in my report all thesummer programswent reallywell Wehave
monthly lunches daytrips and other events Probablyourtwo biggest events wereLadiesTea
Luncheon Its ourthird one We have a lunch and a fashion show and every year Ilook toget a
local business tohelp cosponsor that event and this year itwasHairfor Guys and Dollsand we
had a turnofthe century styleshow with vintageclothingand Ithink I had about 70 people andthewomenreallyseemtoenjoyitMenarealwaysinvitedbutsofarhaventhadtoomanyof
themshow up for that Then theotherbig tripis the MinnesotaOrchestra puts on a series of4
concerts atNicollet Islandand this year we took 2 buses Had70 people Probably wouldhave
taken 2 more but the problemiswe go toconcerts and Nicollet Island the Pavilion holdsabout
750 people but torinda restaurant bigenough toaccommodate that manypeople isa problembutitsalwaysbeenoneofthefavoritetripswehaveeachsummersoIwillcontinuethatagain
next year Also wevegot Ivebeen working on developing arelationship with the Friends ofthe
Libraryand last participants from thesenior centerare involved in sellingbaked goods and this
year we made homemade dog treats which were a big hit Soitwasreally fun Another thing I
wanttohighlight is wood carving Were nowthe thecarvers arenowalso carving FridaymorningsTheystartedoffonWednesdayandnowcarvingonFridaymorningsThegroup
continues togrow and their work is phenomenal If youget a minute Idontknowifyouveever
gonebythe display caseright outside thesenior center Theyvecarved wood blocks for the City
ofCarver Carveris buildinga newcityhall and theyve asked ourwood carverstocarve blocks
ofdifferent historicalbuildings andsites in Carver thatwill be displayedin their city hall kindoflikethequiltthatshangingoverthelibraryinthefiresideroomPrettyphenomenalworkand
they do a great job sotheir numbersaregrowing and theyre really active They realsogoing to
be doing a wood carving demonstration atthe library Theywere asked a coupleweeks ago to
do a demonstration and teaching out atLowry Park or
Hoffman Lowry Nature Center
Bill LowryNature Center Acouple weeks agoon a Sunday and had a great turnout so stop
byand lookattheir carvings orstopbyon aWednesday or Fridaymorning theyd lovetoteach
other people howtocarve Iamexploring acarvingclassfor children Theyvehad Ithinkoverthesummertheyhad2or3youngerchildrencomeinandtheresafamilythathomeschools
their childrenand themother probably 2 Wednesdays a monthwill bringthe childrenand one of
the wood carvers haskindofadoptedthem and taught themhowtocarvesothats really unique
21
126
Parkand Rec Commission September 25 2007
Theyrejust all sobusy Icantpin downa timebut we canget a class on a Saturday thatwecan
teach
Stolar Do youknow anybody else thatd consider like MEAweekend where theresyouknow
kids wontbe inschool Itscoming up too quick todoanything but Friday morning
Bill Or over a holidayor a longer break Good idea thankyou Last year Istarted LifeLongLearningclassessoin2007Ivebeentryingtofocusoneducationalprogramstotrytoengage
and draw differentpeople intothe senior center Ihad Ithink 4 oftheLifeLong Learning
presentations this year One ofthem had tobe cancelled One on baseball It was an evening
oneand itjust didntgo but the other classeshave really really been well attended Ivegot onerdOctober3ItscalledpopulationHolocaustanditsonthedifferentdemographicpopulationsinEuropeandothercountriesandwhatitwillmeaninthefuturetofuturegenerationsSothatwill
be reallyinteresting Ivealso drawn somelocalpeople in Theres a gentlemanwholives in
Deephaven whoswritten 5 books on the historyofLake Minnetonka Ivehad himcome in
twice totalk Ivehad someone from Icantremember hisname rightnow Antique Traveling
RoadShow that camein appraised and talked about antiques and somebookshehad written andhelivesinExcelsiorsotryingtodrawsomelocalpeopleinaswellaspartoftheeducationfor
them KleinBank has theyre going tosponsor aLifeLongLearningprogram againfor 2008
Theyvereally enjoyed that Ithink on two occasions Marcus Doppler hascome overwhosthe
managerofthe bank herein Chan for twoofthe presentations and hes sent atleast2 other
people toallthe other presentations sotheresbeen some realgoodinteraction with theparticipantsandthebankpersonnelandtheyrereallyenjoyingthissotheyreonboardfor next
year One other thing we just did lastFriday the SeniorCommission had an openhouse and
Sharmeenand I as well as the senior commissiontalked about incorporatinga senior safety day
intotheir openhouses the third open house We had a great turnout EdCoppersmith did a
presentation all morningafter the commissionopen house on emergency preparedness ThenweIvebeentryingtopromotethecongregatediningwhichistheyvegotpeopleprobably2
days aweek that eat there Its not a realregularly attendedprogram sowehave 25 people eat
for congregate dining and then the identityandtheftspecialists forKleinCorp cameand did a
presentation on identity theft fraudsand scamsin the afternoon sothat wasgreatly attended and
peoplereally reallylearned a lot LastlyI heardyoutalking about the veterans memorial ImthgoingtoonNovember9haveaVeteransDaycelebrationIvetalkedwithGaryBoylefrom
the American Legionand the Legion isgoing tobe donatingsome moneyfor a breakfastsowe
willbe honoring ourveterans bothofprevious warsand thanking veterans that areserving today
with apresentation Hopefully wellhave a presentation ofcolors Ihave the Veterans Service
Administrative for CarverCounty coming over totalk on whatveterans services areavailable inCarverCountyaswellasforgethisnameIthinkitwaswellitsMrMcDonaldWellanyway
hesthe mayor ofWatertown He was a representative for 9 yearsinthe Ithink late 80s but he
wasone ofthe 120 peoplefrom Carver County that went toWashington DC in April whenthey
dedicated theWorld WarII veterans memorialand he put together a CDthat hes been working
on for 4 months sowere goingtoshow part ofthatCDthatmorning atthepresentation aswellasaladyfromwholivesinCentennialHillisafemalewhowasinvolvedafemaleveteranso
shesalsogoing tocome and talk about a femalerole in themilitary so itshould be agood
morningand itssomething thatIvebeen wanting todofor yearsand itwillbe anicewayto
thank the veterans and put in aplug for the veterans memorial
22
127
Parkand Rec Commission September 25 2007
Hoffman Its highlightedin the newsletter on the front pageon theright Itsa great program
TJ McDonald
Stolar Thank you Any questions for Susan
Atkins Your newsletter is great
Bill Thank you
Atkins Is the open swimvery well attended
Bill We have regular people Id say probably25 peoplea monthbypunch card attendanceThatbuypunchcardsandtheycanusethepoolanytimetheywantbutitsrecommendedthey
useitin the daywhen hotel guests arentusing it Peoplelove it The waters warm Theres a
changing room Theres a whirlpoolsoa lotofpeople with arthritis orsome other jointproblems
do usethe pool
Stolar Thanks Susan
PARK AND TRAILMAINTENANCE REPORT
Gregory Thank you Well like Jerrysaid another busy summer hascomeand gone AlongwiththatgoesourseasonalhelpRightnowweredowntoabout5seniorsretiredindividuals
and that that areworking for us And actually Ivebeen givingsomereal thought tonextyear
seeing ifIcantcome up with more retiredindividuals thatcanwork for usinsteadofthe high
school agedkidsand that We can get6 months out ofthe retired people which helps usin the
spring andthe fall Gives us a lotmorebenefit outofitthanwhat thehigh school kidsdo soIdliketoseeifIcouldatleastcomeupwith1or2morethatwouldworkonourstafffornextthsummerAlsoAugust11wehadastormcomethroughandImsuremostofyouremember
that The park did get hitwith a lotoftree damage Most ofour parksand trails well anywhere
where wehad trees woodsand that really gotit Lake Ann thetrailbetween Greenwood Shores
and Lake Ann gotsome treesdown Longacreswas hit theworst That was pretty muchimpassablethroughthereforawhileOurstaffparkstaffworkedfor212weeksandthat and
all wedid was removetrees from trailssoitwas quite a bitofdamage there Wevealsothis
summer weworked on the archery range We completely rebuiltall the archery targets Put
newtargetsup and a new wecemented outan area for the people tostandon and everythingelse
and weactually get a lotofpeopledown atthe archery range We ve gottenreal goodcommentsonitTheylikeitThetargetsarealotnicerforthemItseasiergettingtheirarrowsoutand
thatsotheyve beenreally pleasedwith that Also in the monthofAugust weseem tohave a
little bitofaincident with fires Up atLake Susanwe had twoofthemburn onenight
Handicapand a regular and then a few nightslater and that Power Hill got hit That one got
burned And itwasnttoo long after that outatthe rec center somebody went and tried toburnoneofthebabychangingtablessoImnotsurewhatwasgoingonbutitjustprettymuchseemed
tobe thatmonth ofAugust that we had troublesout there
23
128
Parkand Rec Commission September 25 2007
Hoffman Thosewereinvestigated as arson bythe Carver County Sheriffsdepartmentsoarson
signs were placed Arsonhot linessigns wereplaced in the park locations
Gregory Also thanks toJerrysscheduling and that for soccer and that he wasable togive us
one ofourfields down number 1 down atBandimere Parkthat we couldtake and redosowe
over seeded We took out all ofour the holes and everythingwe possiblycould and reseeded
that one and that shouldbe in pretty goodshape for nextspring then Also today out atLakeAnnwestartedtrenchingforthelightstobeinstalledoutthereandalsotheycameoutandthey
startedsurveying for the building thats going tobe installed out there sothosetwo projects are
basically starting on the samedayand hopefully theyllkeep moving along And oneother thing
that we just were going toget goingnowon iswere going tobe adding another ballfield out at
rec centerand weve just measuredeverything out and werein the process wellbe probably begettingnextweektakingthatoutandputtinganinfieldinandchainlinkfenceforbackstopsand
boards It will lookjust like all the other ones out there soitwill get oneadditional ballfield in
Sothatsit
Stolar ThankyouDale Any questions
Kelly Iwas curiousnowsince youreno longer allowing snowmobiling on the southLRT trail
doyouhave plans tofollow thatin the winterfrom Pioneersouthtowards 101
Gregory Idont Todd wetalked about that and there was no planson doing that
Hoffman Presently weveappliedfor walking cross countryskiing anyusebutwere not
planningon plowingit Justgoing toletitremain natural Let the snowfallon it Seehowthe
people begin toutilize it Arethey going toskiit Are they goingtowalk it Justhoware they
going tousethe trailand until such timethatwe welljust get there iftheresnota lotofpeopleusingitandwethinkpeoplewoulduseitifweploweditthenwewouldgoaheadandstartto
lookatit Its a fairlyextensivesection oftrailand wehave were adding miles and adding miles
and adding miles oftrailand so ifwe donthave totakeiton right awayand we just wanttohold
off and wait and seehowpeople respond toitin an unkept condition
Kelly Because peopleseem tousethe Pioneer Trail north That seemstoget used InowEden
Prairiedoes plowand theyseem tostop atPioneer Trail
Hoffman Yeah Eden Prairie southofPioneer because thats the Chanhassenborder
Kelly Well yeah Yeah yeah
Hoffman Thenwewould have togofrom there and really theresno outlet untilyouhit101
Theresno place togo there Sothenyouvegot tokeeprunning untilyouget to soits a very
long stretch without anyconnections Street connections Trailconnections and sobefore weinvestallthattimeandmoneyandefforttogetdowntherewejustwanttowaitandseehow
people respond toit There stillaresome snowmobiles usingthat That willhappen either way
ifwe plowitornot because theyre there right off the just after the heavy snowfallso
24
129
Parkand Rec Commission September 25 2007
Gregory We did just finish today improving thatsection oftrail We went wesprayed all the
weeds and everythingalong the trailand we wentdown there tilledup thesoil and everythingelseandregradedit
Kelly Oh right by rightwhere
Hoffman From BluffCreek west
Kelly Okay
Gregory Sowe just graded itand Imean made smoothed itout and madea nice a lotnicer trail
out ofitnow
Hoffman Theproblemspot atPioneer both the City ofEden Prairieand ThreeRivers arevery
well aware ofitand
Kelly Its been okaynowbut Ithinkbecause there hasntbeen that much
Hoffman Probably wetnowthough
Kelly another question too Doyouthink this is kindofoffthe wall Doyouthink weneed
agarbage canbyfield1 atBandimere Bythe soccer field There seems tobe Isee alotofgarbagearoundtheedgeofthatfieldprettymuchfromspectatorsforsoccergamesIdont
know where thenearest garbage canis inBandimere Idontknowifthere wasa need toput a
garbage canright off ofthe trail
Hoffman On the 101side
Kelly No on the west side
Gregory On the parking lotside
Kelly Yeah Or potentially on Ithink where mostthe spectatorsprobably standon the parking
lotside I just dontknow where because Iknow that tendstoget a little bittrashed aftersoccer
games
Hoffman We canadd one
Kelly Ididntknow what ifyou guyshaveseen the samething ornot
Hoffman Wed rather pickitup out ofa trashliner than off theground
Kelly Andthe other question Ihad sorryIm monopolizing the time You seem tohave
reseeded Bandimere a lot Is that just because its a soccer fieldthere orjust is is thesoil there
bad thatyouactually have toconstantly
25
130
Parkand Rec Commission September 25 2007
Gregory It gets the mostuseofanyofthe fieldsdown there
Kelly Okay
Gregory I meanits not onlywith schedulingand thatbutwhen anybody comes down there for
practice and that its the veryfirstfieldas youcomein and theypark rightthere and rightaway
theygo mostthe time theyllgoand park on the westsideparking lotand theyllusethatnetrightthereandthatthemouthofthatandthatandeverythingelseisalwaystheonethatsthe
worst Its just closer for people
Kelly Okay Iwas just curious Okay thanks
Hoffman Andits rotating around
Kelly Yeah
Ruegemer We have a10 yearrestingschedule for not onlyBandimeresites butNorthLotusandLakeAnnWetrytokeepeverythingkindofrotatingaroundKindofforecastyouknow
wherethe useis Certainly Bandimere hasfull 3 full sizedsoccer fields It seems like we are
restingatleast one atBandimereevery year and theyrestatLake Ann Werekindofscheduling
uniquely atLake Annthat we make traditionally in thepast wevemade smaller soccer fields
within the larger soccer fields sowerestillplaying soccer in the fall but then itgives usanopportunitytomovethegoalsclosertogetherAndthenwevestillbeenreseedingorresodding
the goal mouthareas for thetraditionally biggerfields so werestillkindofyouknow killing
twobirds with one stoneIguesswith that sowere really trying toschedule smart and kindof
keep rotating thingsaround Nextyearcertainly is going tobe increase usewith the ballfield
lights sowellhave toget alittle bitmore creative when itcomes toresting
Kelly Okay I dowantto dontknow what magic youdidbut considering thewatering ban that
we had for awhile those Bandimeresoccer fields cameback pretty nice
Stolar Anyoneelse Okay thankyou Dale
ADMINISTRATIVE REPORT
Hoffman ThankyouChair Stolar members ofthe commission Iwontgothrough each
specificitem If youhave questionson anyitem Iwill answer thoseafter were done hittingathfewhighlightsAgainthe2030comprehensiveplanisnotonthe16ThatsthePlanningndCommissionopenhouseItsandpublichearingItsonthe2sothatsnextTuesday700 in
this room for thepark andrecreation section Ithink its alsothenatural resource sectionthat
evening Parks and open spaceand natural resources soyouhave the Planning Commission
Thats theonlything on the agenda thatnight Public openhouse and sothere maybe no oneintheaudienceTheremayjustbecouldbe10to15peopleItdependsonhowmuchfolkswant
toengage inthe comprehensive planning process Turning the pagetotheCarver County Blue
Cross Blue Shield healthyinitiativecommunityfair This issomemapping youcan take a look
atatthe conclusion ofthe meeting This is an effortwhich willmap all the trails in Carver
26
131
Parkand Rec Commission September 25 2007
County Something the commissionhasasked for from time totimeand area residents aswell
so youllbe able togoon both the city and the countywebsite Click on Carver County healthyinitiativeMapsometrailroutesthroughoutCarverCountyandthisisallbroughttothe
communitythrough thatBlue CrossBlue Shield grant Andthe Carver County healthy initiative
willbe include other itemsas well MinnewashtaRegional Park off leash dogarea ourcontractstwithCarverCountystatesthatthatshallopenbyDecember31ofthisyearItsaninteresting
opening time for offleash dogareas butIdontcare what timeyouopenthis thing middle ofwinteritwillstillbehighlyusedandpublicizedJustwhenIwasupstairsbetweenhourshere
ForestAdams from theVillager wascalling todo astory on off leash dogareas soits stillout
there and they arecontinuing towork on the project We borrowed themour Caterpillar
bulldozerfor a couple ofweekswhich they completeda lotoftheirheavy earth work with that
About 3 weeks ago Last item tohighlightis Ithink its worthy tonote thatatthe newChanhassenHighSchoolthattheChaskaSchoolDistricthasannouncedthatboththefootball
trackstadium and then the twopractice fields atthatlocation willbe artificial turfand that will
alsobe in addition tothe footballstadiumatthe Chaska HighSchool will be opened in 2009 fall
of2009with artificial turfas well Sothat holds very well
Stolar Similar towhat theyput in atthe ballfield atMinnetonka
Hoffman Idontknow what typeitwillbe but its going tobe artificial turf No grass No
irrigation Nomaintenance No grass maintenance Artificial turfmaintenance
Stolar At the Minnetonka baseball field itlookslike grassbut Itssomethingelse over there
Hoffman Yeah And Illanswer questions on anyitems
Stolar You saidthatwillbe available on the website Is the inventory alsogoing tobeavailableonthewebsite
Hoffman Yes It will be part ofthe comp plan aswell
Stolar Okay Sowe canjust download that Maybeput an announcement inone ofthenewslettersmapleleafIfyouwanttoifyoueverwonderwhatalltheparksareandallthe
trails
Hoffman That will be fairlyinteractive People canclick on their neighborhoodpark Find out
whats there in the park master plan
Stolar Any other questions for Todd under administrative report This isvery helpful and its a
goodsummaryofthe work thats going on and great work byall thestaff Gettinga lotdone
Hoffman Thank you
COMMISSION MEMBER COMMITTEE REPORTS None
27
132
Parkand Rec Commission September 25 2007
COMMISSION MEMBER PRESENTATIONS
Stolar Does anyone have anyquestions orcomments on the administrative packet Any
committeereports orpresentations Paula anything on anyofthe
Atkins Yeah I dontknow ifmy isa memberpresentation Its just about the artscouncil
Stolar Right Thats Ithink we basically putiton the memberpresentation section Wouldyou
like togo tothat right now
Atkins Yeah we met several people from the firstmeeting came backfor another meeting in
August atthe library Westarted drawing up some plans and weactually called in Laura ZaebelfromSpringboardfortheArtswhoisgoingtohelpusapplyforanonprofitstatusanddrawupthourArticlesandhelpusformourboardWeregoingtoconcentrateorinOctober18were
going tohave another meeting well publicized Ihopefor people interested in doingsome
brainstorming on developingourvision and our mission Andwere going towork on doing a
communityevent in the spring Possibly in CityCenter Parkencompassing various areas oftheartsandgetthewordoutsowerejusthopingtogetalotmorepeopleinterestedatourcore
groupthatiswilling towork really hard on this Rightnowtheres probably4 ofuswhoare
willing todoitsoIllkeepyouupdated AndForrest Adams from the Villager is abig supporter
so hes beenreporting on everything we do Everytime we meetsothats really helpful
Stolar Okay thankyou Yeah welljust youknow for both that and the historical society if
youeverwant topresent welljust do itatthatlocation
Atkins Well okay Iwent tothatmeeting too and theyare meeting with aladyfrom the Carver
County Historical Society whoishelpingthem developtheir board ofdirectors and articles andnonprofitstatusActuallygotmyhusbandonthecommitteeboardTheyregoingtohave
possibly orwe had a hugeturnoutatthe library for thatmeeting lastweek and Sharmeencame
Hername is Wendy Bjorn Ithink from Carver County and so thats comingalong too Were
just have tokeep plugging away
Stolar Thank youfor bringing thatinformationback tothe commission Appreciate it Any
questions for Paula Okay
ADMINISTRATIVE PACKET
Stolar JustIguess thecommenting was thebees Everywhere else the farmers want the bees
theycantget them
Hoffman Yeah weve got them
Stolar If we couldjust kindofgather themand export themtothe fields
Ruegemer Are occurring problem
28
133
Parkand Rec Commission September 25 2007
Stolar I assumethose are waspsand not honey bees At least oneofthesesaid itwaswasps
Hoffman I received a report from Jim Bledsoe todaywhocoordinates helpscoordinates the
farmersmarket They hada very successful summer 9 vendors Ithink 7 ofthemarefull time
and they feelthatthis year was really the yeartheyreached acriticalmass They vegot enough
customers every weekand every vendors everyweek sobotharehappyand theyllcontinueto
grow Theyalso had an interestingstory on the dayofthe storm They lost 500worth ofsignsFarmermarketsignswhichendedupbeingkindlinginthemainstreetareaofdowntownChanso
their signs stay out untilsomeone picks themup on Sunday orMondaymorningand theywere
out for the storm and wereall destroyed sothat was acapitalinvestment item for them
Stolar Sogladitsgoing well for them
Daniel Ive gottwo questions One anything anypertinentdiscussionson theKerber Pond
not buckthornbut the deadelm the virusand that
Hoffman Yeah wevegot that schedule for later this year Letssee we worked on thePowerHillParktrailNowweregoingtoworkontheballfielddownattheRecCenterandthenwere
moving intoKerber Pond where itsnot onlyin the treesbut sometrailrestoration on thesouth
side
Daniel Okay Excellent
Stolar Did youhave another question
Daniel It was goingtobe about the buckthorn and I realized itwas already answered so
Hoffman Theres a buckthorn articlein theMaple Leaf sothat prompted some people tostart
calling about ourpublicproperties and Kerber Pond wasone ofthem Jill respondedback that
we have a manyareas ofourpublic parks and openspace preserve that have buckthorn some of
themare fairly severe We donthave the cash We donthave the programstomanage that and
so JillSinclair through herenvironmental resource coordinating is attempting toopenup aninvasivemanagementsystemorplanandsooncethatplanisdevelopedthentheyllstarttaking
alookatspecific areasbut everythingisnot going tobe able tobe doneatonce Infacttheyll
have totake specific areasand start buckthornremoval and buckthornmanagement so Its I
would sayitsprobably in every property thatwehave Inevery property thatwehave The
removal efforts todatehave not been overwhelming successful In factI think in manycasestheygobackwardsbecauseifyoustartandyoudontcontinueintheprocessitjustgetsworst I
liken ittomilfoil When youkill milfoilwith aherbicide yeah its gone andthe bottom ofthe
lakeisdeadand empty but thenwhen the plants come back the milfoilcomes back even
stronger It just comesback 100 because its thefirstthing Itsthe most aggressive Same
thing with milfoil You cut down or with buckthorn You cut down a hedge rowoflargetreesThisfarorinchorinchanahalf2inches3inchesandyoumighthaveadozenor15treesin
there Next year youregoingtohave 200or 300 little seedlings in there growing up becausethe
seeds that are all underneath thosetrees they remain dormant becausetheres too much shade
from the largetreesuntil suchtime youcut themdown Once youcut them down theyall
29
134
Parkand Rec Commission September 25 2007
germinate and theyall come up If youcome back and sprayand remove thosebyhand itjust
makes itworst So its avery difficult thing tomanage Veryexpensive thing tomanage AndquitefranklyImnotconvincedthatwelleverbeabletomanageit100inourpublicpark
areas Ijust dontthink wellbe able to the resourcesarentthere Youcould we could spend a
milliondollarson buckthorn removal in the city ofChanhassenon an annualbasis Its not going
tohappen so Its just not going tohappen
Atkins I wasatKerber Pondthe other dayand Iwaslooking for Idontunderstand what the
problematKerber PondPark iswith buckthorn Thepath isclear around the lake oraround the
pond
Hoffman You walk the asphalttrail its just about all surroundedbybuckthorn especially onthelakesideAndsowhatyouhaveisyouhaveaverydensethicketofbuckthornNothing
wrong with itperse except
Stolar Anything else Justa comment on the administrativesection Theletterabout the
playground is righton target My daughter and her friends love look forwardtoiteveryweekItsagreatprogramItreallyis
Stutzman Yeah thatprogramwas up hugethis year
Stolar And that sI think tothe leadersthat we bringin year inand yearout soitwasgood
Atkins AdventureCamp was greattoo
Stolar Any finalitems Seeingnone dowe have amotion for adjournment
Scharfenberg moved Danielseconded toadjourn the meeting All voted in favorandthe
motion carriedunanimously with a vote of6 to0
SubmittedbyTodd Hoffman
Parkand Rec Director
PreparedbyNann Opheim
30
135
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
ib
ill f T
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Paul Oehme Dir of Public Works City Engineer
October 22 2007DATE
SUBJ TH 212 Project No 03 09 Approve MnDOT Traffic Signal
Agreements
REQUESTED ACTION
Approve Signal Agreement Nos 87715M Powers Lyman Boulevards 87678M TH
212 at Powers Boulevard north and south ramps and 87679M TH 101 at Lyman
Boulevard
DISCUSSION
In conjunction with the TH 212 312 project seven new signals will be built at various
locations for the project The County and MnDOT policies have the local jurisdiction
pay for the power to operate the signal and lights at the intersection Construction cost
agreements for the traffic signal was covered under the TH 212 Cost Participation
Agreement Depending on who owns what leg of the intersection the City may
participate in future minor maintenance of the signal and street lights The City would
participate in the major maintenance or replacement of the signal in the future depending
on the signal The attached agreements provide operations maintenance and electrical
energy for the new traffic control signals with street lights emergency vehicle pre
emption signing and interconnect at the above referenced intersections
The agreements have been reviewed and are consistent with the current cost participation
policies The City has requested changes to the other three signal agreements for the
212 312 project Staff will have the City Council consider these agreements at a future
meeting
RECOMMENDATION
Staff recommends the City Council Approve Signal Agreement Nos 87715M Powers
Lyman Boulevards 87678M TH 212 at Powers Boulevard north and south ramps
and 87679M TH 101 at Lyman Boulevard
Attachments Traffic Signal Agreement No 87715M
Traffic Signal Agreement No 87678M
Traffic Signal Agreement No 87679M
Carver County Public Works Cost Participation Policies
Signal Location Map
The City of Chanhassen A growin flit IVi1 lQiJ1OOak igflllalil m lfllmm QWll own thriving businesses winding trails and beautiful parks A glBat place to live work and play136
MINNESOTA TRANSPORTATION DEPARTMENT
TRAFFIC CONTROL SIGNAL
AGREEMENT NO 87715M
BETWEEN
THE STATE OF MINNESOTAt DEPARTMENT OF TRANSPORTATION
AND
THE COUNTY OF CARVER
AND
THE CITY OF CHANHASSEN
TO
Provide Operationst Maintenance and Electrical Energy for the
new Traffic Control Signal with Street Lightst Emergency Vehicle
Pre emptiont and Signing on CSAH 17 Powers Blvd at CSAH 18
LYman Blvd t in the City of Chanhassent Carver CountYt
Minnesota
S P 1017 12
Prepared by Metropolitan District Traffic Engineering
ESTIMATED AMOUNT RECEIVABLE AMOUNT ENCUMBERED
NONE None
Otherwise Covered
87715M
1
137
PARTIES
THIS AGREEMENT is entered into by the Minnesota
Department of Transportation State the County of Carver
County and the City of Chanhassen City
RECITALS
Minnesota Statutes Section 161 20 authorizes the
Commissioner of Transportation to enter into agreements with any
governmental authority for the purposes of constructing
maintaining and improving the Trunk Highway system
The parties have determined that there is justification and
it is in the public s best interest to install a new traffic
control signal including street lights and signing Traffic
Control Signal on CSAH 17 Powers Blvd at CSAH 18 Lyman
Blvd
The City requests and the County and State agree to the
installation of an Emergency Vehicle Pre emption System EVP
System as a part of the new Traffic Control Signal
installation
It is considered in the public s best interest for the
State to provide a new traffic control cabinet and control
87715M
2
138
equipment State Furnished Materials to operate the new Traffic
Control Signal
The CountYI CitYI and State will participate in the
maintenance and operation of the new Traffic Control Signal and
EVP System
The State will perform the operation and timing of the new
Traffic Control Signal and EVP System for the County all on a
reimbursable basis
CONTRACT
1 The State will prepare the necessary planl
specifications and proposall Preliminary Engineering The
State will also perform all necessary construction inspectionl
Construction Engineering for State Project No 1017 12
2 The Statel with its own resources or by contract 1 will
install a new Traffic Control Signal and EVP System on CSAH 17
Powers Blvd at CSAH 18 LYman Blvd 1 pursuant to the plans
and specifications for State Project No 1017 12 The cost
participation for the new Traffic Control Signal and EVP System
pay items including State Furnished Materials for this project
will be covered in Municipal Agreement No 871851 between the
87715M
3
139
County and the State and in Municipal Agreement No 87187
between the City and the State
3 The City will be responsible for the cost and
application to secure an adequate power supply to the service
pad or pole Upon completion of this project the City will
thereafter pay all monthly electrical service expenses necessary
to operate the new Traffic Control Signal and EVP System
4 Upon completion of this project the responsibility
for the new Traffic Control Signal is as follows a The County
will at its cost and expense l relamp the new traffic control
signal 2 paint the new traffic control signal and 3 clean
the controller and service cabinet b The City will at its
cost and expense 1 maintain the new luminaires and all their
components including replacement of the luminaire if necessary
2 relamp the new street lights and 3 clean and paint the
new luminaire mast arm extensions and c The State will
maintain the traffic signal cabinet and control equipment
repair knockdowns of the Traffic Control Signal system and
perform all other traffic control signal and street light
maintenance all on a reimbursable basis with the County
Painting will be ln accordance with Mn DOT Standard
87715M
4
140
Specification 2565 3T unless approved by the State s District
Traffic Engineer
5 The State shall perform and provide the timing and
operations of the new traffic control signal system all on a
reimbursable basis with the County
6 The EVP System will be installed operated
maintained or removed in accordance with the following
conditions and requirements
a All maintenance of the EVP System will be
performed by the State all on a
reimbursable basis with the County
b Emitter units may be installed only on
authorized emergency vehicles as defined in
Minnesota Statutes Section 169 01
Subdivision 5 Authorized emergency
vehicles may use emitter units only when
responding to an emergency The City will
provide the State s Metropolitan District
Engineer or his designated representative a
list of all vehicles with emitter units
upon request
87715M
5
141
c Malfunction of the EVP System must be
reported to the State immediately
d In the event the EVP System or its
components are in the opinion of the State
being misused or the conditions set forth in
Paragraph b above are violated and such
misuse or violation continues after the City
receives written notice from the State the
State may remove the EVP System Upon
removal of the EVP System pursuant to this
Paragraph all of its parts and components
become the property of the State
7 Upon completion of any work performed under this
agreement the State will submit to the County a detailed
invoice in duplicate listing all labor equipment and materials
used The County will reimburse the State for services provided
hereunder as follows
a Direct labor charges will be reimbursed at
the actual hourly rates paid to State forces
performing the work
b Fringe benefits will be reimbursed as a
percentage of direct labor charges such
87715M
6
142
percentage to be determined by the State
Accounting and Finance Section at the
beginning of each State fiscal year from the
current cost accounting data
c Overhead costs will be reimbursed as a
percentage of the total of direct labor
charges fringe benefits and the cost of any
materials equipment and personal expense
provided such percentage to be determined
by the State Finance and Accounting Section
at the beginning of each State fiscal year
from the current cost accounting data
d Any material used will be reimbursed at
their actual cost to the State
e The County shall pay the State a flat fee of
1 000 00 per year for the timing and
operation of the new Traffic Control Signal
and EVP System Such flat fee shall be in
addition to any maintenance and repair as
stated in paragraphs 4 5 and 6
8 Upon receipt of said invoice the County will promptly
pay the State the full amount due If the County fails to pay
87715M
7
143
any amount due to the State under this agreement the
Commissioner of Transportation may withhold payment of State Aid
money to the County to the extent provided by Minnesota
Statutes Section 161 38 Subdivision 6
9 Any party may terminate this agreement upon providing
30 days notice to the other party The County s termination
must be accomplished by a resolution of the County Board The
City s termination must be accomplished by a resolution of the
City Council The State1s termination must be accomplished by a
letter from Mn DOT s Metropolitan District Engineer or his
successor Upon termination it will be the County s
responsibility at its costs and expense to maintain and keep
in repair the Traffic Control Signal and EVP System Upon
termination the timing and operation of the Traffic Control
Signal and EVP System will be determined by the County s Traffic
Engineer
10 Each party will be solely responsible for its own acts
and omissions and the results thereof to the extent authorized
by law The State1s liability is governed by the Minnesota Tort
Claims Act Minnesota Statutes Section 3 736 The County s and
City s liability is governed by Minnesota Statutes Chapter 466
87715M
8
144
Each party will be solely responsible for its own employees for
any Workers Compensation Claims
11 Any amendment to this Agreement must be in writing and
will not be effective until it has been executed and approved by
the same parties who executed and approved the original
Agreement or their successors in office
12 If any party fails to enforce any provisions of this
Agreement that failure does not waive the provision or its
right to enforce it
13 This Agreement contains all negotiations and
agreements between the parties No other understanding
regarding this Agreement whether written or oral may be used
to bind either party
14 Minnesota law governs this contract Venue for all
legal proceedings arising out of this Agreement or its breach
must be in the appropriate state or federal court with competent
jurisdiction in Ramsey County Minnesota
15 This Agreement is effective on the date the State
obtains all required signatures under Minnesota Statutes 16C 05
Subdivision 2 and will remain in effect until te minated by
written agreement of the parties
87715M
9
145
16 The State s obligation to perform any work or to let
a Contract for the performance of the work on the State Project
referenced above is subject to the availability of funding from
the Minnesota Legislature or other funding source
17 Authorized Agents
a The State s Authorized Agent for the purpose of the
administration of this Agreement is Allan Espinoza
Design Specialist or his successor His current
address and phone number are 1500 County Road B2 West
Roseville MN 55113 651 654 2127
b The County s Authorized Agent for the purpose of the
administration of this Agreement is Bill Weckman
Carver County Department of Public Works or his
successor His current address and phone number are
11360 Highway 212 West P O Box 300 Cologne MN
55322 0300 952 466 5207
c The City s Authorized Agent for the purpose of the
administration of this Agreement is Paul Oehme City
Engineer or his successor His current address and
phone number are 7700 Market Blvd P O Box 147
Chanhassen MN 55317 952 227 1169
87715M
10
146
COUNTY OF CARVER
RECOMMENDED FOR APPROVAL
Date
County Highway Engineer
87715M
11
By
C airperson of the Board
Date
By
Title
Date
147
CITY OF CHANHASSEN
By
Mayor
Date
By
Title
Date
DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION
RECOMMENDED FOR APPROVAL
By
Metropolitan District Engineer State Design Engineer
Date
COMMISSIONER OF ADMINISTRATION As to form and execution
As delegated to Materials
Management Division By
Contract Management
By Date
Date
87715M
12
148
MINNESOTA TRANSPORTATION DEPARTMENT
TRAFFIC CONTROL SIGNAL
AGREEMENT NO 87678M
BETWEEN
THE STATE OF MINNESOTAr DEPARTMENT OF TRANSPORTATION
AND
THE COUNTY OF CARVER
AND
THE CITY OF CHANHASSEN
TO
Provide Maintenance and Electrical Energy for the new Traffic
Control Signals with Street Lightsr Emergency Vehicle Pre
emptionr Signingr and Interconnect on Trunk Highway 212 at CSAH
17 Powers Blvd r North and South Rampsr in the City of
Chanhassenr Carver CountYr Minnesota
S P 1017 12
Prepared by Metropolitan District Traffic Engineering
ESTIMATED AMOUNT RECEIVABLE AMOUNT ENCUMBERED
NONE None
Otherwise Covered
149
PARTIES
THIS AGREEMENT is entered into by the Minnesota
Department of Transportation State the County of Carver
County and the City of Chanhassen City
RECITALS
Minnesota Statutes Section 161 20 authorizes the
Commissioner of Transportation to enter into agreements with any
governmental authority for the purposes of constructing
maintaining and improving the Trunk Highway system
The parties have determined that there is justification and
it is in the public s best interest to install new traffic
control signals including street lights signing and
interconnect Traffic Control Signal s on Trunk Highway 212
at CSAH 17 Powers Blvd North and South Ramps
The City requests and the State agrees to the installation
of Emergency Vehicle Pre emption Systems EVP System s as a
part of the new Traffic Control Signal installations
It is considered in the public s best interest for the
State to provide two 2 new traffic control cabinets and
control equipment State Furnished Materials to operate the new
Traffic Control Signals
The County City arid State will participate in the
maintenance and operation of the new Traffic Control Signals and
EVP Systems
87678M
1
150
CONTRACT
1 The State will prepare the necessary plan
specifications and proposal Preliminary Engineering The
State will also perform all necessary construction inspection
Construction Engineering
2 The State with its own resources or by contract will
install new Traffic Control Signals and EVP Systems on Trunk
Highway 212 at CSAH 17 Powers Blvd North Ramp System A
and South Ramp System B pursuant to the plans and
specifications for State Project No 1017 12 The cost
participation for the new Traffic Control Signal and EVP System
pay items including State Furnished Materials for this project
will be covered in Municipal Agreement No 87185 between the
County and the State and in Municipal Agreement No 87187
between the City and the State
3 The City will be responsible for the cost and
application to secure an adequate power supply to the service
pads or poles Upon completion of this project the City will
thereafter pay all monthly electrical service expenses necessary
to operate the new Traffic Control Signals and EVP Systems
4 Upon completion of this project the responsibility
for the new Traffic Control Signals is as follows a The
County will at its cost and expense l relamp the new traffic
control signals 2 paint the new traffic control signals and
3 clean the controllers and service cabinets b The City
will at its cost and expense 1 maintain the new luminaires
87678M
2
151
and all their componentsf including replacement of the luminaire
if necessary 2 relamp the new street lights and 3 clean
and paint the new luminaire mast arm extensions and c The
State willf at its cost and expensef maintain the signing and
interconnectf and perform all other traffic control signal and
street light maintenance Painting will be in accordance with
Mn DOT Standard Specification 2565 3Tf unless approved by the
Statefs District Traffic Engineer
5 The EVP Systems will be installedf operatedf
maintainedf or removed in accordance with the following
conditions and requirements
a All maintenance of the EVP Systems will be
performed by the State
b Emitter units may be installed only on
authorized emergency vehiclesf as defined in
Minnesota Statutes Section 169 01f
Subdivision 5 Authorized emergency
vehicles may use emitter units only when
responding to an emergency The City will
provide the Statefs Metropolitan District
Engineer or hi designated representative a
list of all vehicles with emitterunitsf
upon request
c Malfunction of the EVP System s must be
reported to the State immediately
87678M
3
152
d In the event the EVP System s or its
components are in the opinion of the State
being misused or the conditions set forth in
Paragraph b above are violated and such
misuse or violation continues after the City
receives written notice from the State the
State may remove the EVP System s Upon
removal of the EVP System s pursuant to
this Paragraph all of its parts and
components become the property of the State
e All timing of the EVP Systems will be
determined by the State
6 Each party will be solely responsible for its own
acts and omissions and the results thereof to the extent
authorized by law The State s liability is governed by the
Minnesota Tort Claims Act Minnesota Statutes Section 3 736
The County s and City s liability is governed by Minnesota
Statutes Chapter 466 Each party will be solely responsible for
its own employees for any Workers Compensation Claims
7 All timing of the new Traffic Control Signals
will be determined by the State and no changes may be made
except with the approval of the State
8 Any amendment to this Agreement must be in
writing and will not be effective until it has been executed and
approved by the same parties who executed and approved the
original Agreement or their successors in office
87678M
4
153
9 If any party fails to enforce any provisions of
this Agreement that failure does not waive the provision or its
right to enforce it
10 This Agreement contains all negotiations and
agreements between the parties No other understanding
regarding this Agreement whether written or oral may be used
to bind either party
11 Minnesota law governs this contract Venue for
all legal proceedings arising out of this Agreement or its
breach must be in the appropriate state or federal court with
competent jurisdiction in Ramsey County Minnesota
12 This Agreement is effective on the date the State
obtains all required signatures under Minnesota Statutes 16C 05
Subdivision 2 and will remain in effect until terminated by
written agreement of the parties
13 The State s obligation to perform any work or to
let a Contract for the performance of the work on the State
Project referenced above is subject to the availability of
funding from the Minnesota Legislature or other funding source
14 Authorized Agents
a The State s Authorized Agent for the purpose of the
administration of this Agreement is Allan Espinoza
Design Specialist or his successor His current
address and phone number are 1500 County Road B2 West
Roseville MN 55113 651 654 2127
87678M
5
154
b The County s Authorized Agent for the purpose of the
administration of this Agreement is Bill Weckman
Carver County Department of Public Works or his
successor His current address and phone number are
11360 Highway 212 West P O Box 300 Cologne MN
55322 0300 952 466 5207
c The City s Authorized Agent for the purpose of the
administration of this Agreement is Paul Oehme City
Engineer or his successor His current address and
phone number are 7700 Market Boulevard P O Box 1471
Chanhassen MN 553171 952 227 1169
87678M
6
155
COUNTY OF CARVER
RECOMMENDED FOR APPROVAL
Date
County Highway Engineer
87678M
7
By
Chairperson of the Board
Date
By
Title
Date
156
CITY OF CHANHASSEN
By
Mayor
Date
By
Title
Date
DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION
RECOMMENDED FOR APPROVAL
Metropolitan District
Engineer
By
State Design Engineer
Date
COMMISSIONER OF ADMINISTRATION As to form and execution
As delegated to Materials
Management Division By
Contract Management
By Date
Date
87678M
8
157
MINNESOTA TRANSPORTATION DEPARTMENT
TRAFFIC CONTROL SIGNAL
AGREEMENT NO 87679M
BETWEEN
THE STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
D
THE COUNTY OF CARVER
D
THE CITY OF C HASSEN
TO
Provide Maintenance and Electrical Energy for the new Traffic
Control Signal with Street Lights Emergency Vehicle Pre
emption Signing and Interconnect on Trunk Highway 101 at CSAH
18 LYman Blvd in the City of Chanhassen Carver County
Minnesota
S P 1017 12
Prepared by Metropolitan District Traffic Engineering
ESTIMATED AMOUNT RECEIVABLE AMOUNT ENCUMBERED
NONE None
Otherwise Covered
87679M
1
158
PARTIES
THIS AGREEMENT is entered into by the Minnesota
Department of Transportation State the County of Carver
County and the City of Chanhassen City
RECITALS
Minnesota Statutes Section 161 20 authorizes the
Commissioner of Transportation to enter into agreements with any
governmental authority for the purposes of constructing
maintaining and improving the Trunk Highway system
The parties have determined that there is justification and
it is in the public s best interest to install a new traffic
control signal including street lights signing and
interconnect Traffic Control Signal on Trunk Highway 101 at
CSAH 18 Lyman Blvd
The City requests and the State agrees to the installation
of an Emergency Vehicle Pre emption System EVP System as a
part of the new Traffic Control Signal installation
It is considered in the public s best interest for the
State to provide a new traffic control cabinet and control
equipment State Furnished Materials to operate the new Traffic
Control Signal
The County City and State will participate in the
maintenance and operation of the new Traffic Control Signal and
EVP System
87679M
2
159
CONTRACT
1 The State will prepare the necessary plan
specifications and proposal Preliminary Engineering The
State will also perform all necessary construction inspection
Construction Engineering
2 The State with its own resources or by contract will
install a new Traffic Control Signal and EVP System on Trunk
Highway 101 at CSAH 18 Lyman Blvd pursuant to the plans and
specifications for State Project No 1017 12 The cost
participation for the new Traffic Control Signal and EVP System
pay items including State Furnished Materials for this project
will be covered in Municipal Agreement No 87185 between the
County and the State and in Municipal Agreement No 87187
between the City and the State
3 The City will be responsible for the cost and
application to secure an adequate power supply to the service
pads or poles Upon completion of this project the City will
thereafter pay all monthly electrical service expenses necessary
to operate the new Traffic Control Signal and EVP System
4 Upon completion of this project the responsibility
for the new Traffic Control Signal is as follows a The County
will at its cost and expense 1 relamp the new traffic
control signal 2 paint the new traffic control signal and
3 clean the controller and service cabinet b The City will
at its cost and expense 1 maintain the new luminaires and
all their components including replacement of the luminaire if
87679M
3
160
necessary 2 relamp the new street lights and 3 clean and
paint the new luminaire mast arm extensions and c The State
will at its cost and expense maintain the signing and
interconnect and perform all other traffic control signal and
street light maintenance Painting will be in accordance with
Mn DOT Standard Specification 2565 3T unless approved by the
State s District Traffic Engineer
5 The EVP System will be installed operated
maintained or removed in accordance with the following
conditions and requirements
a All maintenance of the EVP System will be
performed by the State
b Emitter units may be installed only on
authorized emergency vehicles as defined in
Minnesota Statutes Section 169 01i
Subdivision 5 Authorized emergency
vehicles may use emitter units only when
responding to an emergency The City will
provide the State s Metropolitan District
Engineer or his designated representative a
list of all vehicles with emitter units
upon request
87679M
4
161
c Malfunction of the EVP System must be
reported to the State immediately
d In the event the EVP System or its
components are in the opinion of the State
being misused or the conditions set forth in
Paragraph b above are violated and such
misuse or violation continues after the City
receives written notice from the State the
State may remove the EVP System Upon
removal of the EVP System pursuant to this
Paragraph all of its parts and components
become the property of the State
e All timing of the EVP System will be
determined by the State
6 Each party will be solely responsible for its own acts
and omissions and the results thereof to the extent authorized
by law The State s liability is governed by the Minnesota Tort
Claims Act Minnesota Statutes Section 3 736 The County s and
City s liability is governed by Minnesota Statutes Chapter 466
Each party will be solely responsible for its own employees for
any Workers Compensation Claims
7 All timing of the new Traffic Control Signal will be
determined by the State and no changes may be made except with
the approval of the State
87679M
5
162
8 Any amendment to this Agreement must be in writing and
will not be effective until it has been executed and approved by
the same parties who executed and approved the original
Agreement or their successors in office
9 If any party fails to enforce any provisions of this
Agreement that failure does not waive the provision or its
right to enforce it
10 This Agreement contains all negotiations and
agreements between the parties No other understanding
regarding this Agreement whether written or oral may be used
to bind either party
11 Minnesota law governs this contract Venue for all
legal proceedings arising out of this Agreement or its breach
must be in the appropriate state or federal court with competent
jurisdiction in Ramsey County Minnesota
12 This Agreement is effective on the date the State
obtains all required signatures under Minnesota Statutes 16C 05
Subdivision 2 and will remain in effect until terminated by
written agreement of the parties
13 The State s obligation to perform any work or to let
a Contract for the performance of the work on the State Project
referenced above is subject to the availability of funding from
the Minnesota Legislature or other funding source
87679M
6
163
14 Authorized Agents
a The State s Authorized Agent for the purpose of the
administration of this Agreement is Allan Espinoza
Design Specialist or his successor His current
address and phone number are 1500 County Road B2 West
Roseville MN 55113 651 654 2127
b The County s Authorized Agent for the purpose of the
administration of this Agreement is Bill Weckman
Carver County Department of Public Works or his
successor His current address and phone number are
11360 Highway 212 West P O Box 300 Cologne MN
55322 0300 952 466 5207
c The City s Authorized Agent for the purpose of the
administration of this Agreement is Paul Oehme City
Engineer or his successor His current address and
phone number are 7700 Market Boulevard P O Box 147
Chanhassen MN 55317 952 227 1169
87679M
7
164
COUNTY OF CARVER
RECOMMENDED FOR APPROVAL
Date
County Highway Engineer
87679M
8
By
Chairperson of the Board
Date
By
Title
Date
165
CITY OF CHANHASSEN
By
Mayor
Date
By
Title
Date
DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION
RECOMMENDED FOR APPROVAL
Metropolitan District
Engineer
By
State Design Engineer
Date
COMMISSIONER OF ADMINISTRATION As to form and execution
As delegated to Materials
Management Division By
Contract Management
By Date
Date
87679M
9
166
EXHIBIT ItAII
CARVER COUNTY
DIVISION OF PUBLIC WORKS
COST PARTICIPATION POLICIES
APPLICABLE
TO
COOPERATIVE HIGHWAY PROJECTS
BETWEEN
CARVER COUNTY AND OTHER AGENCIES
Adopted by the Carver County Board of Commissioners on February 17 1998
Amended by the Carver County Board of Commissioners on February 13 2007
167
TABLE OF CONTENTS
Pa e
PURPOSE 1
SCOPE 1
GEN ERAL POLICI ES 1
DEFINITIONS 2
ROADWAYS
RIGHT OF WAy 3
CLEARING AND GRUBBING 3
GRADING 3
BASE AND SURFACING 3
STORM SEWER 3
CONCRETE SIDEWALK 4
CONCRETE CURB GUTTER 4
CONCRETE CURB GUTTER AND SIDEWALK FOR MEDIANS 4
CONCRETE DRIVEWAY ENTRANCES 4
MUNICIPAL UTILITY RELOCATION OR RECONSTRUCTION 4
PRIVATE UTILITY RELOCATION OR RECONSTRUCTION 5
TRAFFIC SIGNAL SYSTEMS
PERMANENT TRAFFIC SIGNAL INSTALLATION 5
TEMPORARY TRAFFIC SIGNAL INSTALLATION 7
BRIDG ES 9
STREET LIGHTING 9
BIKEWAYS 9
LANDSCAPING 9
ENGIN EERING 10
LUMP SUM PRO RATA ITEMS 1 0
INVOICE AMOUNT COMPUTATION 10
MAINTENANCE 1 0
168
CARVER COUNTY
DIVISION OF PUBLIC WORKS
1
COST PARTICIPATION POLICIES
APPLICABLE
TO
COOPERATIVE HIGHWAY PROJECTS
BETWEEN
CARVER COUNTY AND OTHER AGENCIES
I PURPOSE
To establish policies for determining appropriate division of cost participation to be used by Carver
County in funding cooperative roadway traffic signal and bridge construction projects with the
Minnesota Department of Transportation municipalities and other agencies
II SCOPE
The establishment of cost policy is consistent with Minnesota Statutes Sections 162 17 373 01 471 59
and Amendments
III GENERAL POLICIES
A The basic premise is that the County pays for costs peculiar to County needs and municipalities
pay for costs peculiar to municipal or local needs
B The County may limit its participation to items eligible for reimbursement with County State Aid
Highway CSAH funds notwithstanding the specific policies contained in this document
However the County will not request CSAH funds for project costs assigned to the municipality
as a result of the approved cooperative construction agreement in order not to preclude the
municipality from using its Municipal State Aid funds for those project costs
C A greater degree of County participation is afforded municipalities having a population of less
than 5 000 because of the function of the County roadways in these areas It is generally true
that these roadways are of greater benefit to County wide users and of less benefit to local users
than is the case for roadways in more urbanized areas In addition this would be a form of
compensation for the absence of direct State Aid allocations to these municipalities
D It is recognized that there may be occasional differences between these policies and written
participation policies of the Minnesota Department of Transportation In those cases
participation will be negotiated by the County Engineer
1
169
IV DEFINITIONS
Bikewav A bicycle route bicycle path or bicycle lane
1 Bicycle Route A roadway or shoulder signed to encourage bicycle use
2 Bicycle Path A bicycle facility designed for exclusive or preferential use by persons using
bicycles and constructed or developed separately from the roadway or shoulder
3 Bicycle Lane A portion of a roadway or shoulder designed for exclusive or preferential use by
persons using bicycles Bicycle lanes are to be distinguished from the portion of the roadway or
shoulder used for motor vehicle traffic by physical barrier striping marking or other similar
device
ContributinQ Flow A storm sewer procedure that considers that each agency participates in proportion to
its share of the design discharge for each section of sewer between inflow points This method is used by
the Minnesota Office of State Aid on all projects except where federal participation is anticipated
County Carver County
County Enqineer The County Engineer of Carver County or his designated representative
Municipalitv Any municipality or township within Carver County
Over 5 000 A municipality of 5 000 population or more
Peak DischarQe A storm sewer method that considers that each agency s share is the ratio of its peak
discharge through each section of sewer between inflow points to the summation of peak discharge for all
agencies participating in the section of sewer between inflow points
Permanent Traffic SiQnal A traffic control signal system normally consisting of metal signal poles with
mast arms and underground electrical systems with conduit cable and handhole installations
Storm Sewer A drainage system usually consisting of one or more pipes connecting two or more drop
inlets The purpose is to convey surface runoff water from the inlets to an acceptable outlet
Street LiQhtinQ All components normally installed by a municipality for the purpose of street illumination
Standard Specifications Minnesota Department of Transportation Standard Specification for
Construction latest edition and or supplement thereto
State Aid Manual Manual published by the Minnesota Department of Transportation outlining State Aid
policies and procedures
State Hiqhway A highway under jurisdiction of the State of Minnesota
Temporarv Traffic Siqnal A traffic control signal system normally consisting of wood poles with signal
indications suspended on span wires and overhead electrical systems
Trunk Line Main conveyor of storm sewer system
Under 5 000 A municipality under 5 000 population
Utilities Water heating electric storm sewer gas sanitary telephone cable TV telegraph street
lighting fiber optics etc
2
170
V ROADWAYS
The County s participation in roadway projects will be as follows
A RIGHT OF WAY
1 Right of way permanent roadway easement slope easement drainage easement and
temporary construction easement for existing County highway
Under 5 000
Over 5 000
Negotiation by County Engineer
Negotiation by County Engineer
2 Right of way permanent roadway easement slope easement drainage easement and
temporary construction easement for any newly established or dedicated County
highway
Under 5 000
Over 5 000
Negotiation by County Engineer
Negotiation by County Engineer
3 The County s percentage of participation in retaining walls constructed in lieu of right of
way will be the same as for right of way
4 Right of way required for wetland mitigation and for surface water retention basins will be
at the same participation ratio as the remainder of the project even if the locations of
these facilities are not contiguous to the project
B CLEARING AND GRUBBING
Under Over 5 000 100
C GRADING
Under Over 5 000 100
D BASE AND SURFACING
1 County participation for a 4 lane street or a 2 lane street with parking
Under Over 5 000 100
2 County participation in base and surfacing of parking lanes requested by a municipality
on a 4 lane street
Under Over 5 000 0
E STORM SEWER
The County s participation is based on the State Aid formula as defined in State Aid Manual No
5 892 600 605 which uses the ratio of contributing flows except on federally funded projects
where the peak discharge formula is used to arrive at the percentage of allowable state Aid funds
The construction of retention basins for surface water and storm sewer runoff will be considered
part of the trunk storm sewer system and will be at the same participation ratio as the trunk storm
sewer lines Participation on County Roads will be determined by using the State Aid formula
using the ratio of contributing flows
3
171
1 Trunk lines
Under 5 000
Over 5 000
100 of County s Contributing Flow
100 of County s Contributing Flow
2 Catch basins and leads within the County highways and at the curb returns of side
roadway entrances that drain onto the County highways
Under 5 000
Over 5 000
100 of County s Contributing Flow
100 of County s Contributing Flow
No credit is allowed to a municipality for an inplace storm sewer system
F CONCRETE SIDEWALK CONCURRENT WITH COUNTY CONSTRUCTION PROJECT
New Under Over 5 000
Replacement Under Over 5 000
0
100
Except when County Engineer determines existing to be worn out Worn out sidewalk to
be treated as new sidewalk
G CONCRETE CURB AND GUTTER NEW OR RECONSTRUCTED AND CONCRETE
PEDESTRIAN RAMPS NEW OR RECONSTRUCTED CONCURRENT WITH COUNTY
CONSTRUCTION PROJECT
New Under 5 000
New Over 5 000
Replacement Under Over 5 000
50
0
100
Except when County Engineer determines existing to be worn out Worn out concrete
curb and gutter to be treated as new concrete curb and gutter
H CONCRETE CURB AND GUTTER AND SIDEWALK FOR MEDIANS NEW OR
RECONSTRUCTED CONCURRENT WITH COUNTY CONSTRUCTION PROJECT
Under 5 000
Over 5 000
100
100
I CONCRETE DRIVEWAY ENTRANCES NEW OR RECONSTRUCTED CONCURRENT WITH
COUNTY CONSTRUCTION PROJECT
Under 5 000
Over 5 000
100
100
J MUNICIPAL UTILITY RELOCATION OR RECONSTRUCTION
1 Initial installation performed without a permit or not in compliance with a County permit
Under Over 5 000 0
2 Relocation reconstruction improvement or replacement of unserviceable existing
facilities County Engineer shall determine if existing facility is serviceable or
unserviceable
Under Over 5 000 0
3 Relocation necessitated because of addition of parking lane requested by the
4
172
municipality
UnderlOver 5 000 0
4 In kind relocation required solely because of County construction procedures
UnderlOver 5 000 100
5 Adjustment of existing utility structures to accommodate elevation changes at the street
surface This includes items such as adjusting manhole castings and valve boxes
Lateral extension of utility appurtenances such as hydrants water service valves etc
required by the road construction are not included in this category unless they are
required solely due to the addition of a parking lane requested by a municipality
UnderlOver 5 000 0
K PRIVATE UTILITY RELOCATION OR RECONSTRUCTION
1 Initial installation was within County right of way
UnderlOver 5 000 0
VI TRAFFIC SIGNAL SYSTEM
The County s participation in traffic signal system projects will be as follows
A PERMANENT TRAFFIC SIGNAL SYSTEM INSTALLATIONS
Intersection of County Hiqhway with City Street andlor Township Road City or Township
Location
1 County cost participation in the installation of a traffic signal to be proportional to the
number of legs that are County highways Le 2 of 4 entering legs are County highways
participation equals 50 The County will own the traffic signal the control equipment
and electrical wiring including conduit and bases
2 County cost participation in the furnishing and maintenance of electrical power to a traffic
signal including the attached street lights to be 0 if the traffic signal is located within a
City The City will be responsible for 100 of the costs of furnishing and maintaining
electrical power for the traffic signal and the attached street lights
3 County cost participation in the furnishing and maintenance of electrical power to a traffic
signal including the attached street lights to be 0 if the traffic signal is located within a
Township The Township will be responsible for 100 of the costs of furnishing and
maintaining electrical power for the traffic signal and the attached st eet lights
4 County cost participation in the maintenance of a traffic signal to be 100 unless
otherwise stipulated by special agreement with the Minnesota Department of
Transportation or other agency
The County will provide traffic signal major maintenance and system operation for all
county highway intersections Major maintenance includes the signal controller
hardware and other associated items
The County will provide traffic signal minor maintenance not including the attached street
lights at all county highway intersections with city streets andlor township roads Minor
5
173
maintenance includes cleaning painting using a Mn DOT acceptable color of paint
relamping of a signal system replacing the lamp and cleaning the reflector and lens for
all the signal heads and other associated items Cities and or Townships are
responsible for 100 of maintenance associated with street lights on a traffic signal
5 County cost participation in any subsequent revisions modifications or updatings of a
traffic signal originally installed in accordance with the provisions of this cost participation
policy even to the extent of complete reconstruction to be borne in the same manner as
the initial installation
Intersection of County Hiahwav with State Hiahwav Citv or Township Location
1 County cost participation in the installation of a traffic signal to be generally consistent
with Minnesota Department of Transportation policies
2 County cost participation in the furnishing and maintenance of electrical power to a traffic
signal including the attached street lights to be 0 if the traffic signal is located within a
City The City will be responsible for 100 of the costs of furnishing and maintaining
electrical power for the traffic signal and the attached street lights
3 County cost participation in the furnishing and maintenance of electrical power to a traffic
signal including the attached street lights to be 0 if the traffic signal is located within a
Township and there are one or more Township Road legs to the intersection The
Township will be responsible for 100 of the costs of furnishing and maintaining
electrical power for the traffic signal and the attached street lights If there are no
Township Road legs to the intersection then the County will be responsible for 100 of
the costs of furnishing and maintaining electrical power
4 County cost participation in the maintenance of a traffic signal to be generally consistent
with Minnesota Department of Transportation policies
Mn DOT will provide traffic signal major maintenance and system operation for all trunk
highway intersections Major maintenance includes the signal controller hardware and
other associated items
The County will provide traffic signal minor maintenance not including the attached street
lights at all trunk highway intersections with County highways Minor maintenance
includes cleaning painting using a Mn DOT acceptable color of paint relamping of a
signal system replacing the lamp and cleaning the reflector and lens for all the signal
heads and other associated items Cities and or Townships are responsible for 100 of
maintenance associated with street lights on a traffic signal
5 County cost participation in any subsequent revisions modifications or updatings of a
traffic signal originally installed in accordance with the provisions of this cost participation
policy even to the extent of complete reconstruction to be borne in the same manner as
the initial installation
Intersection of County Hiahwav with a Private Access Citv or Township Location
1 County cost participation in the installation of a traffic signal to be 0 The County will
own the traffic signal the control equipment and electrical wiring including conduit and
bases
2 County cost participation in the furnishing and maintenance of electrical power to a traffic
signal including the attached street lights to be 0 The local unit of government City
and or Township will be responsible for 100 of the costs of furnishing and maintaining
electrical power for all lighting systems
6
174
3 County cost participation in the maintenance of a traffic signal to be 100 unless
otherwise stipulated by special agreement with the Minnesota Department of
Transportation or other agency
The County will provide traffic signal major maintenance and system operation for all
county highway intersections Major maintenance includes the signal controller
hardware and other associated items
The County will provide traffic signal minor maintenance not including the attached street
lights at all county highway intersections with city streets and or township roads Minor
maintenance includes cleaning painting using a Mn DOT acceptable color of paint
relamping of a signal system replacing the lamp and cleaning the reflector and lens for
all the signal heads and other associated items Cities and or Townships are
responsible for 100 of maintenance associated with street lights on a traffic signal
4 County cost participation in any subsequent revisions modifications or updatings of a
traffic signal originally installed in accordance with the provisions of this cost participation
policy even to the extent of complete reconstruction to be borne in the same manner as
the initial installation
B TEMPORARY TRAFFIC SIGNAL INSTAllATION
Intersection of County Hiqhway with City Street and or Township Road City or Township
location
1 County cost participation in the installation of a temporary traffic signal to be proportional
to the number of legs that are County highways Le 2 or 4 entering legs are County
highways participation equals 50 if by cooperative agreement it is the plan of the
County the City and or the Township to install a permanent traffic signal at the same
location in the future Full credit for the City s and or Township s investment in the
installation of a temporary traffic signal will be applied toward the City s and or
Township s participation in a permanent traffic signal at the same location if it is installed
within the time limits set forth in the cooperative agreement This credit may be extended
should circumstances beyond the control of the City and or Township delay the
installation of the permanent signal beyond the time limits set forth in the cooperative
agreement The County will own the traffic signal the control equipment and electrical
wiring including conduit and bases
2 County cost participation in the furnishing and maintenance of electrical power to a
temporary traffic signal including the attached street lights to be 0 if the traffic signal is
located within a City The City will be responsible for 100 of the costs of furnishing and
maintaining electrical power for the traffic signal and the ttached street lights
3 County cost participation in the furnishing and maintenance of electrical power to a traffic
signal including the attached street lights to be 0 if the traffic signal is located within a
Township The Township will be responsible for 100 of the costs of furnishing and
maintaining electrical power for the traffic signal and the attached street lights
4 County cost participation in the maintenance of a temporary traffic signal to be 100
unless otherwise stipulated by special agreement with the Minnesota Department of
Transportation or other agency
The County will provide traffic signal major maintenance and system operation for all
county highway intersections Major maintenance includes the signal controller
hardware and other associated items
7
175
The County will provide traffic signal minor maintenance not including the attached street
lights at all county highway intersections with city streets and or township roads Minor
maintenance includes cleaning painting using a Mn DOT acceptable color of paint
relamping of a signal system replacing the lamp and cleaning the reflector and lens for
all the signal heads and other associated items Cities and or Townships are
responsible for 100 of maintenance associated with street lights on a traffic signal
Intersection of County Hiqhway with State Hiqhway Citv or Township Location
1 County cost participation in the installation of a temporary traffic signal to be proportional
to the number of legs that are County highways if by cooperative agreement it is the
plan of the Minnesota Department of Transportation to install a permanent traffic signal at
the same location in the future Said cooperative agreement is to include a provision
whereby full credit for the County s investment in the installation of a temporary traffic
signal will be applied toward the County s participation in a permanent traffic signal at the
same location
2 County cost participation in the furnishing and maintenance of electrical power to a traffic
signal including the attached street lights to be 0 if the traffic signal is located within a
City The City will be responsible for 100 of the costs of furnishing and maintaining
electrical power for the traffic signal and the attached street lights
3 County cost participation in the furnishing and maintenance of electrical power to a traffic
signal including the attached street lights to be 0 if the traffic signal is located within a
Township and there are one or more Township Road legs to the intersection The
Township will be responsible for 100 of the costs of furnishing and maintaining
electrical power for the traffic signal and the attached street lights If there are no
Township Road legs to the intersection then the County will be responsible for 100 of
the costs of furnishing and maintaining electrical power
4 County cost participation in the maintenance of a temporary traffic signal to be generally
consistent with Minnesota Department of Transportation policies
Mn DOT will provide traffic signal major maintenance and system operation for all trunk
highway intersections Major maintenance includes the signal controller hardware and
other associated items
The County will provide traffic signal minor maintenance not including the attached street
lights at all trunk highway intersections with County highways Minor maintenance
includes cleaning painting using a Mn DOT acceptable color of paint relamping of a
signal system replacing the lamp and cleaning the reflector and lens for all the signal
heads and other associated items Cities and or Townships are responsible for 100 of
maintenance associated with street lights on a traffic signal
Intersection of County Hiqhway with a Private Access City or Township Location
1 The installation of a temporary traffic signal at an intersection of a County Highway with a
Private Access will only be permitted if by written agreement it is the plan to install a
permanent traffic signal at the same location by a specific date
2 County cost participation in the installation of a temporary traffic signal to be 0 The
County will own the traffic signal the control equipment and electrical wiring including
conduit and bases
8
176
I
3 County cost participation in the furnishing and maintenance of electrical power to a
temporary traffic signal including the attached street lights to be 0 The local unit of
government City and or Township will be responsible for 100 of the costs of furnishing
and maintaining electrical power for all lighting systems
4 County cost participation in the maintenance of a temporary traffic signal to be 100
unless otherwise stipulated by special agreement with the Minnesota Department of
Transportation or other agency or party
The County will provide traffic signal major maintenance and system operation for all
county highway intersections with a private access Major maintenance includes the
signal controller hardware and other associated items
The County will provide traffic signal minor maintenance not including the attached street
lights at all county highway intersections with a private access Minor maintenance
includes cleaning painting using a Mn DOT acceptable color of paint relamping of a
signal system replacing the lamp and cleaning the reflector and lens for all the signal
heads and other associated items Cities and or Townships are responsible for 100 of
maintenance associated with street lights on a traffic signal
VII BRIDGES
The County s participation in bridge projects will be as follows
Under Over 5 000 Negotiation by County Engineer
VIII STREET LIGHTING
The County will not participate in the installation of new street lighting with the exception of those street
lights attached to traffic signals on County highways Those lights will be financed on the same basis as
the installation of traffic signals Participation in the relocation or reconstruction of existing street lighting
will be on the same basis as for municipal utility relocation or reconstruction see Paragraph J of Section
No V
IX BIKEWAYS
Carver County recognizes the increasing use of bicycles as a means of transportation Carver County will
consider incorporating bicycle lanes or routes within the roadway design when the route is part of an
overall community bicycle system plan when economically feasible to construct and when judged to be
in the best interest of the public Bicycle paths separate from the roadway itself will normally not be
constructed unless it is part of an overall community plan for a bicycle trail system The County s
participation in bicycle routes paths and lanes will be as follows
Under Over 5 000 0
X LANDSCAPING
The County will participate in State Aid eligible landscaping items with total participation not to exceed
25 of the maximum permitted by State Aid rules
9
177
XI ENGINEERING
The County s participation in engineering includes design costs which are cost incurred prior to the award
of the contract and contract administration costs which are costs incurred subsequent to the award of
contract
A The municipality will reimburse the County an agreed negotiated percentage of the
municipality s share of the contract construction cost for the Design and or Contract
Administration performed by the County
Under Over 5 000 Negotiation by County Engineer
B The County will reimburse the municipality an agreed negotiated percentage of the County s
share of the contract construction cost for the Design and or Contract Administration performed
by the municipality
Under Over 5 000 Negotiation by County Engineer
XII LUMP SUM PRO RATA ITEMS
Proposal forms carry lump sum bidding requirements for the items of Mobilization 2021 Maintenance
and Restoration of Haul Roads 2051 and Traffic Control 0563 Field Office and Field Laboratory
2031 are not strictly speaking lump sum pay items However their general characteristics are such as
to require that they be handled the same as Mobilization A municipality shall be charged a pro rata
share of the above items Proration shall be based on a percentage factor applied to the cost amounts
chargeable to the County and the municipality for other construction items Mobilization Maintenance
and Restoration of Haul Roads Field Office and Field Laboratory and Traffic Control are construction
items and shall be subject to the negotiated percentage charge for engineering
XIII INVOICE AMOUNT COMPUTATION
After bids have been received and a contract awarded and also upon completion of construction the unit
prices shall be substituted for the estimated unit prices quantities and the percentage ratio established
originally shall be recomputed
XIV MAINTENANCE
The County is responsible for maintaining the County highway between curbs or between outside edge of
shoulders It may enter into agreement with the municipality to perform this work on a reimbursable
bapis
The County is responsible for maintenance of bridges and culverts on the County route
The municipality is responsible for maintenance of its utilities including any storm sewer within the County
highway right of way
The municipality is responsible for maintaining bicycle paths and walking trails within the County highway
right of way
The municipality is responsible for maintaining boulevard or ditch areas landscaped median areas
irrigation systems sidewalk retaining walls steps and other related items within the right of way on an
urban design section
10
178
OSprll i a
0
i
g
1
e e jrc
IS t
0
Pelllb P Q
a ij
n
O
6
V
V e
1
I
4
l
r o J
f
Ii
l
if
j
t
c
t 1 d
0
i l
iAI
Q
mll
t
i5
6
i
h
1lI
ThfllSllCrt
T f
1
tI lI HRS cJ f
J 1 i
I c j
I
0 rJ1
D
i8arbll aC 2 I11I
9o
6 1GllSG 9O
I
9 e
I
l i6 0 Nll
l
Tt
r l
i
li i
o
I i
j
Traffic Control Signal Agreements Between Mn DOT City of Chanhassen Carver County
September 9 2007
1
QI
j
6O
Co
00
I o0
If CL
f
It
IlLYmBIVC9
j
11
cI jel1
O rt 1
II
r
I
31
1 i
SJ
llrfjeIq6moe
J1
i I
11
y
lS
t
0
GI El
j f
0
0ii
1
Lyman Blvd C R 1
Q
l
iE
s nn
e 0
drrl
OIlOse
s ftl
i clQ
jl
p8 lI
v
I
J
I
Oeel1lol T 1 I
l4
II
ldlrlJ FIeY8 a
179
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
wwwci chanhassen mn us
J c 1
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Sharmeen AI Jaff Senior Planner
October 22 2007DATE
SUBJ Lotus Woods Pinal Plat Approval Paul Eidsness
Planning Case 07 09
PROPOSAL SUMMARY
The developer is requesting final plat approval with variances to subdivide 7 6 acres
into 11 single family lots and 1 outlot with a Variance to allow a 50 foot wide street right
of way for Lotus Woods Subdivision
ACTION REQUIRED
City Council approval requires a majority of City Council present
BACKGROUND
On June 11 2007 the City Council adopted the following motion
The City Council approves the preliminary plat for Planning Case 07 09 for Lotus
Woods Subdivision for 11 lots and 1 outlot with a variance to allow a 50 foot right
of way as shown on the plans dated received May 4 2007 prepared by Otto
Associates subject to the following conditions
1 A wetland buffer 25 feet in width shall be maintained around all Manage 1
wetlands All wetlands and wetland buffer areas shall be protected by silt fence
during grading Wetland buffer areas shall be preserved surveyed and staked in
accordance with the City s wetland ordinance The applicant shall install
wetland buffer edge signs under the direction of City staff before construction
begins and shall pay the City 20 per sign Principal structures shall maintain a
setback of at least 30 feet from the wetland buffer edge accessory structures
shall maintain a setback of at least 15 feet from the wetland buffer edge The
wetland buffer and wetland buffer setback shall be shown on the plans
This condition still applies
2 The SWPPP shall be revised to address all items that are unchecked in the
Carver SWCD Stormwater Pollution Prevention Plan Checklist attached to
the April 11 2007 letter to the City from the Carver SWCD
This condition has been amended to read The applicant shall revise the
plans to address the conditions of Carver County Soil and
The City ot Chanhassen A growing community with clean lakes quality schools a channing downtown thriving businesses winding trails and beautiful parks A great place to live work and play180
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 2
Water District as follows The applicant shall note on the plan and or in the contract
that the contractor is responsible for the NPDES permit andwill need to have an
individual qualified to complete weekly and after 1f2 inch rainfall event inspection
reports A box will need to be placed on site for these specific documents Also a
diversion will need to be installed to take storm water during construction to the
sediment pond
3 Stable emergency overflows shall be provided for the proposed pond on site The emergency
overflows shall be clearly labeled on the plan and a detail shall be provided
This condition still applies
4 All riprap fabric at the flared end section shall be installed within 24 hours of flared end
section installation
This condition still applies
5 The ditch section west of Carver Beach Road that receives stormwater from the stormwater
pond shall be stable prior to receiving discharge from the site
This condition still applies
6 Erosion control blanket shall be installed on all slopes greater than or equal to 3 1 All
exposed soil areas shall have temporary erosion protection or permanent cover year round
according to the following table of slopes and time frames
Type of Slope
Steeper than 3 1
10 1 to 3 1
Flatter than 10 1
Time
7 days
14 days
21 days
Maximum time an area can
remain open when the area
is not actively being worked
These areas include constructed storm water management pond side slopes and any exposed
soil areas with a positive slope to a storm water conveyance system such as a curb and gutter
system storm sewer inlet temporary or permanent drainage ditch or other natural or man
made systems that discharge to a surface water
This condition still applies
7 Manholes with two foot sumps shall be installed as the last road accessible structures prior to
discharge into the storm water pond
This condition still applies
8 Chanhassen Type 2 Heavy Duty silt fence shall be installed around all wetlands streams
creeks bluffs and ravines Chanhassen Type 1 silt fence shall be used around the remaining
areas
181
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 3
This condition still applies
9 A temporary sediment basin shall be constructed prior to disturbing upslope areas The areas
of temporary sediment basins shall be labeled on the plan A temporary outlet structure e g
a perforated riser and rock cone shall be provided for the pond a detail shall be provided
This condition still applies
10 Inlet controls are needed for all inlets throughout the project and shall be installed within 24
hours of inlet installation prior to casting Filter fabric held down by steel plates with 12
inches of inch rock over each cover may be used Once casting of inlets takes place inlet
controls shall be installed within 24 hours Inlet protection shall be maintained on a regular
basis For all inlet protection devices details shall be provided in the plan and in the
SWPPP
This condition still applies
11 Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as needed
This condition still applies
12 At this time the estimated total SWMP fee due payable to the City at the time of final plat
recording is 31 996 00
This condition has been amended to read The total SWMP fee due payable to the City
at the time of final plat recording is 31 996 00 This fee was calculated assuming that the
developer will install a storm water pond and an outlet structure allowing a credit of
2 500 Should expansion of the regional pond occur prior to construction of the proposed
on site pond the fee will be increased to 34 496
13 The applicant shall apply for and obtain permits from the appropriate regulatory agencies
i e Riley Purgatory Bluff Creek Watershed District Minnesota Pollution Control Agency
and comply with their conditions of approval
This condition still applies
14 Applicant shall submit a landscaping plan showing 72 trees as replacement plantings All
trees shall be native species Plan shall specify size species and locations
This condition has been amended A landscape plan was submitted and shows 72 trees
to be planted on the lots with the species and sizes in accordance with city ordinances
Staff is concerned that some of the lots place an unreasonable obligation of tree planting
upon lot owners Lot 4 requires 18 trees to be planted Lot 6 requires 13 trees Lots 7
and 5 require 9 and 10 trees respectively The amended condition will read Applicant
shall submit a landscaping plan showing 72 trees as replacement plantings All trees
182
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 4
shall be native species Plan shall specify size species and locations The applicant
shall work with staff to re distribute the quantity of trees on each lot or reduce the total
number of trees to be planted by donating the value of the non planted trees to the city
tree planting fund
15 All areas outside of grading limits shall be protected by tree preservation fencing Fencing
shall be installed prior to grading and excavation for homes on each lot Any trees shown as
preserved on plans dated revised on 5 12007 must be replaced at a rate of 2 1 diameter
inches if removed
This condition still applies
16 No grading shall be allowed on Outlot A
This condition still applies
17 A minimum of two overstory trees shall be planted in the front yards of Lots 1 8 Block 1
This condition still applies
18 All structures within the proposed right of way or within the required setback of Block 2
must be removed
This condition still applies
19 Building Official Conditions
a A final grading plan and soils report must be submitted to the Inspections Division before
building permits will be issued
b Demolition permits must be obtained prior to demolishing any structures on the site
c Retaining walls more than four feet high must be designed by a professional engineer and
a building permit must be obtained prior to construction
d Separate sewer and water services must be provided to each lot
e Any existing wells and on site sewage treatment systems on the site must be abandoned
in accordance with State Law and City Code
This condition still applies
20 Fire Marshal conditions
a A lO foot clear space must be maintained around fire hydrants i e street lamps trees
shrubs bushes Xcel Energy Qwest cable TV and transformer boxes This is to ensure
that fire hydrants can be quickly located and safely operated by firefighters
b Fire apparatus access roads and water supply for fire protection is required to be
installed Such protection shall be installed and made serviceable prior to and during the
time of construction except when approved alternate methods of protection are provided
183
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 5
c No burning permits shall be issued for trees to be removed Trees and shrubs must either
be removed from site or chipped
d Fire apparatus access roads shall be designed and maintained to support the imposed load
of fire apparatus and shall be serviced so as to provide all weather driving capabilities
Pursuant to Minnesota State Fire Code Section 503 23
e Fire hydrant locations are acceptable
f Proposed street name is acceptable
g Temporary street signs shall be installed at street intersections once construction of the
new roadway allows passage of vehicles Pursuant to 2002 Minnesota Fire Code Section
5014
This condition still applies
21 Outlot A shall be deeded to the City in lieu of payment of park dedication fees
This condition still applies
22 Revise Sheet 2 of 12 to show House Type C on Lots 5 and 6 Block 1
This condition has been modified to read Revise Sheet 2 of 16 to show House Type C
on Lot 1 Block I
23 The two accessory structures along Lotus Woods Drive must be removed before grading
commences A plan is needed to allow all the existing homeowners access to their properties
until the completion of construction The existing driveways west of Lotus Woods Drive
will need to be removed upon completion of Lotus Woods Drive
This condition has been modified to read The two accessory structures along Lotus
Woods Drive must be removed before grading commences A plan is needed to allow
all the existing homeowners access to their properties until the completion of
construction The existing driveways west of Lotus Woods Drive will need to be
removed upon completion of Lotus Woods Drive Building permits will not be issued
until the driveways west of Lotus Woods Drive are removed
24 Rational method calculations and delineation are needed for the sizing of the storm sewer
Also add the ordinary high water level of the wetland to the plans
This condition has been partially met The modified condition states A rational
method drainage map needs to be submitted along with revised calculations showing
the two additional drainage structures
25 The outlet pipe to the on site pond must be directionally drilled under Big Woods Boulevard
and discharge into the ditch in Triple Crown Estates
This condition has been modified to read The pond outlet needs to be revised The
City is working on a feasibility study for the expansion of the regional pond in Triple
184
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 6
Crown Estates If the City determines that the regional pond can be altered to
accommodate the runoff from the Lotus Woods Development the storm sewer that
discharges into the proposed pond in Lotus Woods should be revised to enter the
regional pond If the storm sewer is revised to drain into the regional pond the pond in
Lotus Woods development would be filled Revise the storm sewer so that it can outlet
to the ditch in Triple Crown Estates now but can be re routed to the pond in Triple
Crown Estates if the feasibility study determines that the Triple Crown Estates Pond
can be revised to have sufficient capacity Revise drainage calculations if the outlet
changes alter the calculations
26 A revised grading plan will be needed to address the following issues
a The lowest openings of houses must be three feet above the ordinary high water level or
one foot above the emergency overflow
b Lots 2 and 4 Block 1 elevations need to be revised if they are indeed walkouts
c The slopes of the driveways on Lots 6 and 8 Block 1 appear to be more than the 10
maximum and need to be revised
d Spot elevations must be shown at each proposed intersection to ensure the curb line has a
5 minimum slope
e Ground i e non paved surface grades shall not be less than 2 All emergency
overflows must be shown on the plan More contour labels are needed Also please turn
offthe tree layer so it is easier to read the grading plan
This condition still applies
27 An easement is required from the appropriate property owner for any off site grading A
temporary construction easement will be needed for the installation of the manhole on Lot 1
of Big Woods on Lotus Lake If importing or exporting material for development of the site
is necessary the applicant will be required to supply the City with detailed haul routes
This condition still applies
28 The existing retaining wall in the southwest comer of the site must be removed before or
during construction of the pond A building permit is required for all retaining walls four
feet tall or higher and must be designed by a Structural Engineer registered in the State of
Minnesota
This condition still applies
29 The watermain extension from Fox Hill Drive must be wet tapped Due to the alignment of
the watermain in Fox Hill Drive it appears that this connection cannot be done under traffic
The watermain connection on Big Woods Boulevard shall connect to the provided stub and
take place under traffic The sanitary sewer connection on Big Woods Boulevard connecting
to an existing stub shall be completed under traffic
This condition still applies
185
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 7
30 Actual elevations of existing utilities must be verified for accuracy Proposed service
connections along with connection details must be added to the plans
This condition has been modified to read Sewer and water services for Lots 7 and 8
were provided with Project 75 04 Revise plans to show connections to these services
31 Each new lot is subject to the sanitary sewer and water hookup charges The 2007 trunk
hookup charge is 1 669 for sanitary sewer and 4485 for watermain Sanitary sewer and
watermain hookup fees may be specially assessed against the parcel at the time of building
permit issuance All of these charges are based on the number of SAC units assigned by the
Met Council and are due at the time of building permit issuance
This condition still applies
32 All of the utility improvements are required to be constructed in accordance with the City s
latest edition of Standard Specifications and Detail Plates The applicant is also required to
enter into a development contract with the City and supply the necessary financial security in
the form of a letter of credit or cash escrow to guarantee installation of the improvements and
the conditions of final plat approval The applicant must be aware that all public utility
improvements will require a preconstruction meeting before building permit issuance
Permits from the appropriate regulatory agencies will be required including the MPCA
Dept of Health Carver County and the Watershed District
This condition still applies
33 The sanitary sewer easement will need to be changed from 20 feet to 30 feet to ensure proper
access for maintenance of this line The actual location of the watermain and the easement
must be shown to determine if the easement is sufficient
This condition still applies
34 The site distance for turning onto Fox Hill Drive must be verified Upon project completion
the applicant shall submit a set of as built plans signed by a professional civil engineer
This condition has been modified to read The site distance for turning onto Fox Hill
Drive must be verified A speed warning sign shall be installed by the developer on Fox
Hill Drive based on the calculations of the sight distance by his engineer Upon project
completion the applicant shall submit a set of as built plans signed by a professional
civil engineer
35 Sheets 2 through 12 shall be revised to reflect the adjusted property lines
This condition has been met All the lines have been adjusted on the final plat and
construction plans
186
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 8
36 The applicant shall work with staff to realign the street connection to Fox Hill
This condition has been met The applicant shifted the street connection 27 feet to the
west
FINAL PLAT
The applicant is proposing to subdivide a 7 6 acre site into 11 single family lots and 1 outlot The
average lot size is 24 633 square feet with a resulting gross density of 14 units per acre and a net
density of 16 units per acre
All of the proposed lots meet the minimum area width and depth requirements of the Zoning
Ordinance There is one outlot shown on the plat Outlot A contains a wetland and a parkland area
It will be dedicated to the City
Staff conducted a hard surface coverage analysis for each proposed lot Current plans Sheet 2 of
16 show House Type A on Lot 1 Block 1 Based on hard surface coverage analysis the house
type on Lot 1 Block 1 must be modified from House Type A to House Type e
The site is heavily wooded The existing woods consist mainly of large mature sugar maples
with a mix of basswood oak and ash It is a healthy forest with little to no invasive species It is
due to this wooded nature that the Parks and Recreation Commission recommend that Outlot A
be taken for public park purposes
Development of the overall site attempts to preserve groups of trees in rear and side yards where
possible
We are recommending that the subdivision be approved with conditions outlined in the staff report
WETLANDS
One Manage 1 wetland basin exists on site Kjolhaug Environmental Services Company
delineated the wetlands in September 2006
Wetland 1 is a Type 1 wetland located in the northwest portion of the site The wetland is
dominated by reed canary grass with green ash American elm beggar ticks and duckweed No
impact is proposed to this basin It is proposed to be located entirely within Outlot A
Wetland setback requirements will be applied at the time that building permits are submitted
The building plans must meet these requirements City ordinance requires a minimum 25 foot
wetland buffer and a minimum 3D foot wetland buffer setback for principal structures total
setback of 55 feet Accessory structures will be required to be set back a minimum of 15 feet
from the wetland buffer edge
A wetland buffer 25 feet in width must be maintained around all Manage 1 wetlands All
wetlands and wetland buffer areas should be protected by silt fence during grading Wetland buffer
areas should be preserved surveyed and staked in accordance with the City s wetland ordinance
187
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 9
The applicant must install wetland buffer edge signs under the direction of City staff before
construction begins and must pay the City 20 per sign Principal structures must maintain a
setback of at least 30 feet from the wetland buffer edge Accessory structures must maintain a
setback of at least 15 feet from the wetland buffer edge The wetland buffer setbacks are shown on
the plans
LAKES
The proposed project is within 1 000 feet of the ordinary high water level OHW of Lotus Lake
and is therefore within the lake s shoreland district Lotus Lake is classified as a recreational
development lake by the Minnesota Department of Natural Resources DNR The minimum lot
size for riparian lots is 20 000 square feet and the minimum lot width is 90 feet All structures
with the exception of one water oriented accessory structure on each lot that complies with
Subsection 20 481 e 2 of Chanhassen City Code must be set back a minimum of 75 feet from
the OHW of the lake 8963 All grading or vegetation removal is subject to Section 20 482 of
the City Code Any existing and proposed docks on the subject properties must meet the
requirements of City Code Chapter 6 Article 2
SURFACE WATER MANAGEMENT
Stonn Water Pollution Prevention Plan SWPPP
The SWPPP must be revised to address all items that are unchecked in the Carver SWCD
Stormwater Pollution Prevention Plan Checklist attached to the April 11 2007 letter to the
City from the Carver SWCD
Erosion Control
Stable emergency overflows are needed for the proposed pond on site The emergency
overflows should be clearly labeled on the plan and a detail must be provided
All riprap fabric at the flared end section should be installed within 24 hours of flared end
section installation
The ditch section west of Carver Beach Road that receives stormwater from the stormwater pond
must be stable prior to receiving discharge from the site
Erosion control blanket should be installed on all slopes greater than or equal to 3 1 All exposed
soil areas should have temporary erosion protection or permanent cover year round according to
the following table of slopes and time frames
Type of Slope
Steeper than 3 1
10 1 to 3 1
Flatter than 10 1
Time
7 days
14 days
21 days
Maximum time an area can
remain open when the area
is not actively being worked
188
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 10
These areas include constructed storm water management pond side slopes and any exposed soil
areas with a positive slope to a storm water conveyance system such as a curb and gutter system
storm sewer inlet temporary or permanent drainage ditch or other natural or man made systems
that discharge to a surface water
Sediment Control
Manholes with two foot sumps should be installed as the last road accessible structures prior to
discharge into the stormwater pond This will help to prolong the maintenance interval of the
proposed stormwater pond
Chanhassen Type 2 Heavy Duty silt fence is needed around all wetlands streams creeks bluffs
and ravines Chanhassen Type 1 silt fence should be used around the remaining areas
A temporary sediment basin should be constructed prior to disturbing upslope areas The areas
of temporary sediment basins should be labeled on the plan A temporary outlet structure e g a
perforated riser and rock cone is needed for the pond A detail should be provided
Inlet controls are needed for all inlets throughout the project and should be installed within 24
hours of inlet installation prior to casting Filter fabric held down by steel plates with 12 inches
of o inch rock over each cover may be used Once casting of inlets takes place inlet controls
must be installed within 24 hours Inlet protection must be maintained on a regular basis For all
inlet protection devices details should be provided in the plan and in the SWPPP
Street cleaning of soil tracked onto public streets should include daily street scraping and street
sweeping as needed
SURFACE WATER MANAGEMENT FEE
Because of the impervious surface associated with this development the water quality fees for this
proposed development are based on single family residential development rates of 1 900 acre
Based on the proposed developed area of approximately 6 9 acres the water quality fees associated
with this project are 13 108
The SWMP has established a connection charge for the different land uses based on an average
citywide rate for the installation of water quantity systems This cost includes land acquisition
proposed SWMP culverts open channels and storm water ponding areas for runoff storage Single
family residential developments have a connection charge of 3 100 per developable acre This
results in a water quantity fee of approximately 21 388 for the proposed development
The applicant will be credited for water quality where NURP basins are provided to treat runoff
from the site This will be determined upon review of the ponding and storm sewer calculations
Credits may also be applied to the applicant s SWMP fees for oversizing in accordance with the
SWMP or the provision of outlet structures No credit will be given for temporary pond areas
189
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 11
At this time the estimated total SWMP fee due payable to the City at the time of final plat
recording is 31 996 00
OTHER AGENCIES
The applicant must apply for and obtain permits from the appropriate regulatory agencies i e
Riley Purgatory Bluff Creek Watershed District Minnesota Pollution Control Agency and comply
with their conditions of approval
GRADING AND DRAINAGE
The 7 97 acre site is bordered by Fox Hill Drive to the north Lotus Lake to the East Big Woods
Subdivision to the south and Carver Beach Road to the west There are three existing houses
four accessory structures and three drives on the site The existing houses will remain along
with two accessory structures The accessory structures near Lotus Woods Drive will need to be
removed A plan will be needed to allow the existing homeowners access to there properties
until the completion of construction The existing driveways west of Lotus Woods Drive will
need to be removed upon completion of Lotus Woods Drive
The high point of the site is near the center of the project and divides the site into four main
pieces Approximately 35 of the site drains towards Lotus Lake 10 drains to catch basins on
the east side of the Big Woods Development 30 drains to the ditch in Triple Crown Estates
and 25 drains north on Carver Beach Road The hydrologic calculations are complete A
copy of the rational method calculations has been provided for the sizing of the storm sewer but
a delineated map is needed to relate the calculations to the project
Current conditions do not permit the drainage from the Lotus Woods Development to enter the
regional pond in Triple Crown Estates west of Carver Beach Road because the Triple Crown
Estates pond is not sized for the additional stormwater The developer has proposed an on site
pond that discharges to the roadside ditch along the west side of Carver Beach Road This
solution is acceptable though not optimal
Over time the City has become aware of issues with stormwater and erosion in this area both
within the stormwater pond and downstream between the pond and Lotus Lake In 2005 2006
erosion caused a blowout of the stretch of creek east of Carver Beach Road This compromised
the cover over the sanitary sewer in that area which was remedied in 2006 In order to improve
the stormwater system in this area the City is proposing a stormwater improvement project in
2007 2008 to assess the issues and devise a solution Analysis of the drainage area has not been
completed and the anticipated improvements are unknown at this time It would be better if the
proposed development could take advantage of the anticipated stormwater improvement project
but it is unknown at this time if the city project will be able to accommodate the development
drainage Regional ponding is a preferable solution for stormwater issues because it improves
sediment removal efficiencies and minimizes future maintenance needs The use of a regional
pond for treatment of stormwater for this development could also free up land and potentially
improve the developer s ability to preserve trees and minimize retaining walls The City and the
190
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 12
developer will need to work together when the results of the regional pond study become
available to discuss the results and any potential changes to the plan
Grading for the project is proposed to be completed in steps The developer is proposing to
grade the road and the pond This would require each individual home owner or builder to grade
the lots An advantage to this scenario is the possibility of saving trees One of the short falls is
that some lots depend on other lots to be graded for drainage purposes Any lot that depends on
the grading of another lot must be completed by the developer If the developer grades the lots
that depend on the other lots for drainage then the individual lots can be constructed in any
sequence
The grading plan will need to be revised Lots 2 and 4 Block 1 elevations need to be revised to
show correct ground elevations if they are indeed walkouts The slopes on the driveways are
shown but it appears that Lots 6 and 8 Block 1 exceed the 10 maximum The grading plan is
hard to follow due to not having enough contour labels and because the tree layer overwhelms
the drawing
The lowest openings of houses must be 3 above the H W L or l above the emergency
overflow
Private driveway grades shall not be less than 2 or exceed 10
Ground i e non paved surface grades shall not be less than 2
Emergency overflow locations and elevations must be shown on the plan
An easement is required from the appropriate property owner for any off site grading
Installation of the manhole on Lot 1 of Big Woods on Lotus Lake will need a temporary
construction easement If importing or exporting material for development of the site is
necessary the applicant will be required to supply the City with detailed haul routes
RETAINING WALLS
The proposed retaining walls are as follows
Location Length Maximum Height
approximate approximate
Lot 7 Block 1 This retaining wall has two
tiers
151 tier 160 feet 4 feet
2nd tier Total elevation difference from top to
bottom 10 feet 8 for wall and 2 feet of 120 feet 4 feet
ground
191
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 13
There is an existing retaining wall in the southwest comer of the site This wall will be removed
before the construction of the pond
Building permits are required for all retaining walls four feet tall or higher and must be designed
by a Structural Engineer registered in the State of Minnesota
UTILITIES
The developer proposes to extend lateral sanitary sewer watermain and storm sewer within the
development All utilities within the right of way shall be publicly owned and maintained
Proposed watermain will extend from the existing watermain stub off of Big Woods Boulevard
and loop to the existing watermain in Fox Hill Drive The proposed watermain will have a total
length of 450 LF Due to the alignment of the watermain offof Fox Hill Drive it appears that
the connection cannot take place under traffic The connection on Fox Hill Drive must be wet
tapped The Big Woods Boulevard connection must connect to the stub provided and take place
under traffic Sanitary sewer for Lots 1 4 Block 1 will extend off of Lotus Woods Drive A
sanitary stub was provided during the Big Woods Subdivision which should allow this
connection to be completed under traffic
Utility plans show both plan view and profiles of all proposed utilities sanitary sewer water
and storm lines Actual elevations of existing utilities shall be verified for accuracy Lot 5
Block 1 did not receive a service stub during the development of Big Woods and will need to
enter the roadway for access to the sewer and water Lots 7 and 8 Block 1 along Carver Beach
Road appear to have service stubs provided by the regional sewer and water project in 1975
There is existing sanitary sewer and watermain along Lotus Lake The sanitary sewer and
easement is shown on the plans The location of the watermain and the watermain easement will
need to be determined
Lateral charges for sanitary sewer and water have been paid Each new lot is subject to the
sanitary sewer and water hookup charges The 2007 trunk hookup charge is 1 669 for sanitary
sewer and 4485 for watermain Sanitary sewer and watermain hookup fees may be specially
assessed against the parcel at the time of building permit issuance All of these charges are based
on the number of SAC units assigned by the Met Council and are due at the time of building
permit issuance
The developer will be responsible for extending lateral sewer and water service to the lots
therefore the sanitary sewer and water connection charges will be waived The assessments for
the connections on Carver Beach Road have already been paid
All of the utility improvements are required to be constructed in accordance with the City s latest
edition of Standard Specifications and Detail Plates The applicant is also required to enter into a
development contract with the City and supply the necessary financial security in the form of a
letter of credit or cash escrow to guarantee installation of the improvements and the conditions of
final plat approval The applicant must be aware that all public utility improvements will require
a preconstruction meeting before building permit issuance Permits from the appropriate
192
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 14
regulatory agencies will be required including the MPCA Dept of Health Carver County and
the Watershed District
EASEMENTS
There is an existing sanitary sewer and a watermain easement along Lotus Lake This sanitary
sewer is currently a 20 easement that needs to be revised to 30 to ensure the maintenance of
this line The actual location of the watermain and the watermain easement will need to be
shown on the plans to see if sufficient easements cover the watermain
Each lot is shown with the required 10 front drainage and utility easement and 5 rear and side
drainage and utility easement The pond and wetland are also covered by a drainage and utility
easement Additional drainage and utility easements are covering the front of Lots 4 6 Block 1
for future maintenance of the proposed storm sewer
STREETS
Access to the site will be provided by Fox Hill Drive Carver Beach Road Big Woods
Boulevard and the proposed Lotus Woods Drive The developer has provided plans showing the
staff requested additional right of way of 30 along Carver Beach Road 10 along Fox Hill Drive
up to Lotus Woods Drive and 5 along Fox Hill Drive from Lotus Woods Drive to Lotus Trail
The reason for changing the width to only 5 of additional right of way along Fox Hill Drive is
so that the setbacks for the existing house near Lotus Lake can still meet City Code
Lotus Woods Drive is proposed to be a 28 back to back road with a 50 right of way The City
agreed to the variance in 2006 when the Eidsness property was split The proposed section of
road matches the Big Woods Development and the surrounding area Lotus Woods Drive will be
publicly owned and maintained The street must be built to a seven ton design and utilize a
maximum grade of 7 The sight distance for turning on Fox Hill Drive must be verified Upon
completion of the public street the applicant shall submit a set of as built plans signed by a
professional civil engineer
PARKS AND TRAILS
The proposed plat combines four separate parcels of land currently best described as a woodlot
allowing for the orderly subdivision of the entire parcel into 11 single family lots Eight of the lots
are located in Block 1 and will be marketed as new home sites The remaining three lots comprising
Block 2 are homes to three of the four owners and are located on Lotus Lake Outlot A has been set
aside at the request of staff as a means of preserving a small intact section of the woodlot
Park and Trail Comprehensive Plan Review
Parks
This property is located within the park service area of Carver Beach Playground and Carver Beach
Park Carver Beach Playground located at 900 Carver Beach Road is a two acre site featuring a
193
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 15
ballfield basketball court and creative playground Carver Beach Park located at 6891 Lotus Trail
is a six acre waterfront park featuring two public swimming beaches a picnic area nature trail and
small playground The nature trail follows the shoreline of Lotus Lake and is nearly one half mile in
length
U r
m
t S z1C
i 1 f e e I lr8 Lo L ko
r
r
I
3diL i iLJ II
I
u
W B
v r
1 1 1 WhmriYi
V I I I Y IIIl5 1 y
II
tt rl
c mB
POlk
ad
Trails
With the exception of the nature trail and one section of concrete sidewalk the Carver Beach
neighborhood is void of trails and sidewalks This condition is directly attributable to the age of the
area and the narrow street grid and road right of ways There is very limited if not non existent
right of way to construct sidewalks and or trails in the area Carver Beach Road serves as a main
transportation corridor in the neighborhood for both vehicles and pedestrians The one sidewalk
mentioned is located on Carver Beach Road starting at Carver Beach Park and travels west to Powers
Boulevard In addition to this sidewalk an important trail connector is located at the terminus of
Carver Beach Road linking pedestrians to Big Woods Boulevard Kerber Pond Park and south to the
downtown area
I
194
i
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 16
Outlot A
The Park and Recreation Commission has the choice of recommending the City Council accept cash
park fees or land dedication as a condition of approval for the Lotus Woods Subdivision The cash
park fees required of this application as submitted are 63 800 or 5 800 per lot Staff recommended
the Commission seek land dedication in lieu of cash park fees as a means of preserving some of the
woodlot character that currently exists on this site The location of this outlot at the intersection of
Carver Beach Road and Fox Hill Drive will serve as a landmark for the new residents In addition
the larger neighborhood and community will view this dedication as a worthy investment in
preserving the unique character or Carver Beach
Staffs request of the applicant was to maximize the size of the undisturbed area oftree preservation
on the comer The maximum
dedication of land allowed by
ordinance is one acre for every 75
people For 11 single family lots with
3 5 persons per home 22 361 square
feet 0 51 acres of park dedication is
required A previous layout of Outlot
A contained less upland area than
required by ordinance
As drawn Outlot A currently contains
37 530 square feet with 8 050 ofthat
being wetland Wetlands are not
accepted as parkland dedication The
wetland also has a buffer that does not
count towards the total area of park
dedication
t J i
SC
I J
TREE PRESERVATIONILANDSCAPING
Tree canopy coverage and preservation calculations for the Lotus Woods development are as
follows
Total upland area excluding wetlands parkland
Total canopy area exclnding wetlands parkland
Baseline canopy coverage
Minimum canopy coverage allowed
Proposed tree preservation
6 7 ac or 293 526 SF
54 ac or 234 634 SF
80
55 or 161 439 ac
32 or 95 368 ac
The developer does not meet minimum canopy coverage allowed therefore the difference is
multiplied by 12 to calculate the required replacement plantings
195
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 17
Difference in canopy coverage
Multiplier
Total replacement
Total number of trees to be planted
66 071 SF
12
79 285 SF
72 trees
A replacement planting plan must be submitted to the City for approval Included in the plan
sha1l be location species and size of replacements A1l replacements must meet minimum size
requirements
A landscape plan was submitted and shows 72 trees to be planted on the lots with the species and
sizes in accordance with city ordinances Staff is concerned that some of the lots place an
unreasonable obligation of tree planting upon lot owners Lot 4 requires 18 trees to be planted
Lot 6 requires 13 trees Lots 7 and 5 require 9 and 10 trees respectively Staff recommends that
the applicant re distribute the quantity of trees on each lot or reduce the total number of trees to
be planted by donating the value of the non planted trees to the city tree planting fund
The existing woods consist mainly of large mature sugar maples with a mix of basswood oak
ash and hickory It is a healthy forest with little to no invasive species Development of the area
should pay special attention to preserving large groups of trees in rear and side yards where
possible This has been done on Lots 2 3 and 8 Of those trees shown as preserved on the lots
any removed must be replaced at a rate of 2 1 diameter inches
COMPLIANCE WITH ORDINANCE RSF DISTRICT
Lot Lot Lot Hard Maximum Home
Area Width Depth Surface Site Setback
Coverage Coverage
Ordinance 15 000 90 125 25 30 frontrear
non npanan 10 sides
20 000 75 Lake
npanan 55 30 Wetland 25
Buffer
Lot Lot Lot Hard Maximum Home
Area Width Depth Surface Site Setback
Coverage Coverage
BLOCK 1
Lot 1 15 005 116 147 38 20 6 3 751 30 INA
non npanan 10 55
Lot 2 15 070
non npanan
93 9 182 2 23 6 3 768 30 30
10 55
Lot 3 16412 90 29 207 19 96 4 103 30 30
196
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 18
non npanan 10 55
Lot 4 17 689
non npanan
119 07 442214332092
Lot 5 15 320
non npanan
151 53 2023 3 830104
Lot 6 16 002
non npanan
157 19 37 4 00090
Lot 7 16 275
non npanan
154 19 8 4 06895
Lot 8 16 298
non npanan
168 20 4 07492
BLOCK 2
Lot 1 338 93 5 6 10 239
Outlot A
43 168
npanan
39 937
npanan
59 791
npanan
37 530
14 947
123 98
116 290 19 9 978Lot2
123 244 113Lot3
30 NA
10
30 30
10 55
30 30
10 55
30 NA
10
30 30
10 55
30 75
10
30 75
10
30 75
10
The current plans reflect a House Type A The plans must be revised to show House
Type C Hard surface coverage calculations include house pad driveway deck patio
and porch
RECOMMENDATION
Staff recommends that the City Council adopt the following motion
The City Council grants final plat approval with a variance for a 50 foot right of way for Lotus
Woods Planning Case 07 09 for 11 lots and 1 outlot as shown on the plans recei ved September
2 2007 subject to the following conditions
1 A wetland buffer 25 feet in width shall be maintained around all Manage 1 wetlands All
wetlands and wetland buffer areas shall be protected by silt fence during grading Wetland
buffer areas shall be preserved surveyed and staked in accordance with the City s wetland
ordinance The applicant shall install wetland buffer edge signs under the direction of City
staff before construction begins and shall pay the City 20 per sign Principal structures shall
maintain a setback of at least 30 feet from the wetland buffer edge accessory structures shall
maintain a setback of at least 15 feet from the wetland buffer edge The wetland buffer and
wetland buffer setback shall be shown on the plans
197
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 19
2 The applicant shall revise the plans to address the conditions of Carver County Soil and
Water District as follows The applicant shall note on the plan and or in the contract that the
contractor is responsible for the NPDES permit and will need to have an individual qualified
to complete weekly and after Y2 inch rainfall event inspection reports A box will need to be
placed on site for these specific documents Also a diversion will need to be installed to take
storm water during construction to the sediment pond
3 Stable emergency overflows shall be provided for the proposed pond on site The emergency
overflows shall be clearly labeled on the plan and a detail shall be provided
4 All riprap fabric at the flared end section shall be installed within 24 hours of flared end
section installation
5 The ditch section west of Carver Beach Road that receives stormwater from the stormwater
pond shall be stable prior to receiving discharge from the site
6 Erosion control blanket shall be installed on all slopes greater than or equal to 3 1 All
exposed soil areas shall have temporary erosion protection or permanent cover year round
according to the following table of slopes and time frames
Type of Slope
Steeper than 3 1
10 1 to 3 1
Flatter than 10 1
Time
7 days
14 days
21 days
Maximum time an area can
remain open when the area
is not actively being worked
These areas include constructed storm water management pond side slopes and any exposed
soil areas with a positive slope to a storm water conveyance system such as a curb and gutter
system storm sewer inlet temporary or permanent drainage ditch or other natural or man
made systems that discharge to a surface water
7 Manholes with two foot sumps shall be installed as the last road accessible structures prior to
discharge into the stormwater pond
8 Chanhassen Type 2 Heavy Duty silt fence shall be installed around all wetlands streams
creeks bluffs and ravines Chanhassen Type 1 silt fence shall be used around the remaining
areas
9 A temporary sediment basin shall be constructed prior to disturbing upslope areas The areas
of temporary sediment basins shall be labeled on the plan A temporary outlet structure e g
a perforated riser and rock cone shall be provided for the pond a detail shall be provided
10 Inlet controls are needed for all inlets throughout the project and shall be installed within 24
hours of inlet installation prior to casting Filter fabric held down by steel plates with 12
inches of inch rock over each cover may be used Once casting of inlets takes place inlet
controls shall be installed within 24 hours Inlet protection shall be maintained on a regular
basis For all inlet protection devices details shall be provided in the plan and in the
SWPPP
198
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 20
11 Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as needed
12 The total SWMP fee due payable to the City at the time of final plat recording is 31 996 00
This fee was calculated assuming that the developer will install a storm water pond and an
outlet structure allowing a credit of 2 500 Should expansion of the regional pond occur prior
to construction of the proposed on site pond the fee will be increased to 34 496
13 The applicant shall apply for and obtain permits from the appropriate regulatory agencies
ie Riley Purgatory Bluff Creek Watershed District Minnesota Pollution Control Agency
and comply with their conditions of approval
14 Applicant shall submit a landscaping plan showing 72 trees as replacement plantings All
trees shall be native species Plan shall specify size species and locations The applicant
shall work with staff to re distribute the quantity of trees on each lot or reduce the total
number of trees to be planted by donating the value of the non planted trees to the city tree
planting fund
15 All areas outside of grading limits shall be protected by tree preservation fencing Fencing
shall be installed prior to grading and excavation for homes on each lot Any trees shown as
preserved on plans dated revised on 5 12007 must be replaced at a rate of 2 1 diameter
inches if removed
16 No grading shall be allowed on Outlot A
17 A minimum of two overstory trees shall be planted in the front yards of Lots 1 8 Block 1
18 All structures within the proposed right of way or within the required setback of Block 2
must be removed
19 Building Official Conditions
a A final grading plan and soils report must be submitted to the Inspections Division before
building permits will be issued
b Demolition permits must be obtained prior to demolishing any structures on the site
c Retaining walls more than four feet high must be designed by a professional engineer and
a building permit must be obtained prior to construction
d Separate sewer and water services must be provided to each lot
e Any existing wells and on site sewage treatment systems on the site must be abandoned
in accordance with State Law and City Code
20 Fire Marshal conditions
199
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 21
a A lO foot clear space must be maintained around fire hydrants i e street lamps trees
shrubs bushes Xcel Energy Qwest cable TV and transformer boxes This is to ensure
that fire hydrants can be quickly located and safely operated by firefighters
b Fire apparatus access roads and water supply for fire protection is required to be installed
Such protection shall be installed and made serviceable prior to and during the time of
construction except when approved alternate methods of protection are provided
c No burning permits shall be issued for trees to be removed Trees and shrubs must either
be removed from site or chipped
d Fire apparatus access roads shall be designed and maintained to support the imposed load
of fire apparatus and shall be serviced so as to provide all weather driving capabilities
Pursuant to Minnesota State Fire Code Section 50323
e Fire hydrant locations are acceptable
f Proposed street name is acceptable
g Temporary street signs shall be installed at street intersections once construction of the
new roadway allows passage of vehicles Pursuant to 2002 Minnesota Fire Code Section
5014
21 Outlot A shall be deeded to the City in lieu of payment of park dedication fees
22 Revise Sheet 2 of 16 to show House Type C on Lot 1 Block 1
23 The two accessory structures along Lotus Woods Drive must be removed before grading
commences A plan is needed to allow all the existing homeowners access to their properties
until the completion of construction The existing driveways west of Lotus Woods Drive
will need to be removed upon completion of Lotus Woods Drive Building permits will not
be issued until the driveways west of Lotus Woods Drive are removed
24 A rational method drainage map needs to be submitted along with revised calculations
showing the two additional drainage structures
25 The pond outlet needs to be revised The City is working on a feasibility study for the
expansion of the regional pond in Triple Crown Estates If the City determines that the
regional pond can be altered to accommodate the runoff from the Lotus Woods
Development the storm sewer that discharges into the proposed pond in Lotus Woods should
be revised to enter the regional pond If the storm sewer is revised to drain into the regional
pond the pond in Lotus Woods development would be filled Revise the storm sewer so that
it can outlet to the ditch in Triple Crown Estates now but can be re routed to the pond in
Triple Crown Estates if the feasibility study determines that the Triple Crown Estates Pond
can be revised to have sufficient capacity Revise drainage calculations if the outlet changes
alter the calculations
26 A revised grading plan will be needed to address the following issues
a The lowest openings of houses must be three feet above the ordinary high water level or
one foot above the emergency overflow
b Lots 2 and 4 Block 1 elevations need to be revised if they are indeed walkouts
200
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 22
c The slopes of the driveways on Lots 6 and 8 Block 1 appear to be more than the 10
maximum and need to be revised
d Spot elevations must be shown at each proposed intersection to ensure the curb line has a
5 minimum slope
e Ground i e non paved surface grades shall not be less than 2 All emergency
overflows must be shown on the plan More contour labels are needed Also please turn
off the tree layer so it is easier to read the grading plan
27 An easement is required from the appropriate property owner for any off site grading A
temporary construction easement will be needed for the installation of the manhole on Lot 1
of Big Woods on Lotus Lake If importing or exporting material for development of the site
is necessary the applicant will be required to supply the City with detailed haul routes
28 The existing retaining wall in the southwest comer of the site must be removed before or
during construction of the pond A building permit is required for all retaining walls four
feet tall or higher and must be designed by a Structural Engineer registered in the State of
Minnesota
29 The watermain extension from Fox Hill Drive must be wet tapped Due to the alignment of
the watermain in Fox Hill Drive it appears that this connection cannot be done under traffic
The watermain connection on Big Woods Boulevard shall connect to the provided stub and
take place under traffic The sanitary sewer connection on Big Woods Boulevard connecting
to an existing stub shall be completed under traffic
30 Sewer and water services for Lots 7 and 8 were provided with Project 75 04 Revise plans to
show connections to these services
31 Each new lot is subject to the sanitary sewer and water hookup charges The 2007 trunk
hookup charge is 1 669 for sanitary sewer and 4485 for watermain Sanitary sewer and
watermain hookup fees may be specially assessed against the parcel at the time of building
permit issuance All of these charges are based on the number of SAC units assigned by the
Met Council and are due at the time of building permit issuance
32 All of the utility improvements are required to be constructed in accordance with the City s
latest edition of Standard Specifications and Detail Plates The applicant is also required to
enter into a development contract with the City and supply the necessary financial security in
the form of a letter of credit or cash escrow to guarantee installation of the improvements and
the conditions of final plat approval The applicant must be aware that all public utility
improvements will require a preconstruction meeting before building permit issuance
Permits from the appropriate regulatory agencies will be required including the MPCA
Dept of Health Carver County and the Watershed District
33 The sanitary sewer easement will need to be changed from 20 feet to 30 feet to ensure proper
access for maintenance of this line The actual location of the watermain and the easement
must be shown to determine if the easement is sufficient
201
Todd Gerhardt
Lotus Woods Final Plat Planning Case 07 09
October 22 2007
Page 23
34 The site distance for turning onto Fox Hill Drive must be verified A speed warning sign
shall be installed by the developer on Fox Hill Drive based on the calculations of the sight
distance by his engineer Upon project completion the applicant shall submit a set of as
built plans signed by a professional civil engineer
35 Any lot that depends on the grading of another lot for proper drainage must be graded by the
developer during road construction This will allow each lot to be built at any time without
the need to sequence The tree preservation fence must be installed by the developer and
remain until the completion of the house
36 Provide a set of catch basins to be installed between Lots 3 and 4
37 Provide drain tile connections to Lots 3 4 5 6 and 7 per section 18 404 of the Chanhassen
City Code
38 Show wetland buffer setback on the grading plan
39 The proposed street name must be approved by the Chanhassen Fire Marshal
40 Construction plans must be signed by a professional engineer licensed in the State of
Minnesota
ATTACHMENTS
1 Final Plat and Construction Plans received September 2 2007
g plan2007 planning cases 07 09 lotus woodsfinal plat doc
202
j
g E I i1J
t t i h1I1IiziqtIw
J I
j
d 1 1 I I j
2 t 0
I h IW i1JIIIz0
ti 1 11 t
IW clgJfI00
I J u LU a
I 0 UJitenwiJtAI0
w II JitIPJfiiiIIibJ1
AIIIJt1JhJI11dsJt1mili
iJ J J H
CI
a
o
CI
I
o
J
t
I
J
f
i
1
JiJII
t
I
t
I
h11hibfbJag
t
J I
fJs 1
JIIJ
jJII
t
I
t
I
I
rIIIIiIibfJIU
J
fJs
ilit
t
I
I
J
t
J J
1 I
i H
jJ tIf
I I J nibIfJh1Uz
f I t iI I
l ili lt f il f I i rj IJ l111ilflllZIlltIIilelItJJJjiIIIiiijilliliIIliliiiJaIliIit1lftftllijtIaIJfIIIJtllIltililliaiiiIIflizilfi
s f1 I z I t ll 11i IIJ r Jl I Illt tl fII1IllfIlilllIiilliIzIfllliJlIIIzJ111ItItlilililjIIIIJt1J1ilM4IJ
i ii I I J lJ 11 i li lil l it i t Jl tfltltJilifJiitliliiiiiIllIflSriIIIt1IIlliilllJiJJilIJIliIilljiIJ111JJiii1IlliltllilflllIt11lilIliIJtIliJJt41114jirliilJiliillIiiitiiiiji1
l JJflli l l lfi i ll tl fl If IJII lt lll i
If
fi h
IB
f I flU
1 1 t
s Jil H H
II J 1 AiiIJIIitl
t 1 I l
It lilthl l
l milP
f i llilt
I
I
r
1UI1hiz
rbfJHz
i
I
I
tJIII
IsJ
f J
1faia
J
fJs
UIt
hH tlithiHz
iiII 1111
N iJi
H IIiI
II
jJJItJI
II i IitJ
It
II11
it
j
ii
IIf
IiIHfIIIIiirbotJAl
I
r II J it
i I i 1IfIitIlifII
I I li tl i llill5tIa1IIIIIZIllflfIWlihnlIItjf11ftJililliI1
j lI hllI J
il tllii afIlliJillflpJ4drtIIJliiifIZltt
I 1 1 4fII Z
IIIII 1irlJiiIIJJlri
I hl i fJtIaiIfZ1 1
I I ll III I llirl II 1 2 11 lII llf I lIl I
s I II iloI1 i i li i f It jll Jl jfl li I ill l11iIIftg11IIllaIf1l1ilIlII
if 1 f ljl il ifi i1ii f ifI J i iiiii j il i iiii iililrlJfIIllfIIIIIi1iIIllIIIIftIJlilIJiiiliiiiifiiilJIiii i
l iII J l l iI j Jf JI I i 1ZIIJ liliJ i ji 11 i1riiiOilillizIlilliiiliIIIIzililll
JI I J It z ll I i t II zfl1 1 lrft Il lf IiiiiliiiiiiIifliiitjIIIiilitljlfiiitii
Jl i ll tl iJ Jizll fzl t i l li 1 I lzI fIflJIijjli11ilziiiIiiIi1tliiflllfillltflfllrl
203
I
0 I
n
0
if
l l
AiijZhihfitlIt
@IJIiltSl
ljHAAi
100
00Zz
c5
Li O0
S
w
f
f
0
IW
z
IW
uU
u W
ocr
3
a
u
o
3
a
I
J
I
IJJ
ri
1
I
i
Cl
n
lU
U
w
I
U
Cf
a
o
Cf
J
o
J
0
n
t
u
4 t
9
r
j J
I
I
1
c
ij
S2
II
7
f
L LJtf
I r C Cf
Cc IffeUJf
j I
J
fCtsI l S IjIiItI
I d
J
3 1Lji
I
I
1 ll
E J a
h
10
i ll
a
iil
o f1
a
3 blih20
I fg
It
L J
v
s
0
5
fn
0
204
n
I
t
1
31 J I
31
31 6
CJ 1
4 1
o
O
lj
C 3 Ul
r
if 1u
r
4
O 3 r
3 A
z t r4y
J 1
CJ t DlJuA
I
I I
J
iiii l fiiijiO
Z
J
A
o
O
l
I I
J 0 yh
0 I I
l t j
Jo I
l
IMi 1
C
Cj
co
i
iinUI
g f o
ums
lO
ci
z
tJ
W
I
Vl
en
o z
o
OZ
en
m
lil2
I
o I
J
U
i
ll floC
J
I
c I
I
t
I
I
i I
I
I
I II nn
I
I
I
I
I HiJ
I
J
I J
I
I
I
I l
I
I
I
I
I o
J
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
j 1
h t1
205
Ng g3oitIw
OIeil SlffiNHGiliD
2 dljoj tl ailoOiliQelolill8oieOjFjo8lQSJIi9EltililL6iJoGlAffiee
I 5 1 0ho
n oi O O
I o I 5 ol iiSlHlMZ
rl 11
m
w
Cl
W
V
o
I
w
Cl
W
V
o
I
w
Cl
W
V
o
I
J
I
I
LI
1
L
I
I
I
I
S 3
Pl f
o
0
9 a
9
N
z 85I
Cl
eJ
i u
0
w
I N
en
o 0
z
o t
w
I
CI
o z
o
Gm
C1
alZ
I
o is
III
I I
I I
I I
I I
I I
I I
I I
I I
I I I nilII
I I I UhnIIw 1IIIII
I iI
I I
I I
I I
I
I
iiitI513I0
il
g
j11Dc
Bl
Ii
n3
I
ci
03
t
7
i
206
v 9ih
i
M
o
i 8o
tm i i
5 gi E O
8ill i ci iz g
T gH i i
oj elIl g CD l z 0
t O
o
E gg ffi
vicilt i
ui
3i O
M i a2h
II ii g t al iID l1 i t1
S j z 1 1 f 3XI1oI u
g J m i
cJ ri orIo
R 8 0
0N
0
Z f
ti
wffiwI
1 f
I
0 0 0wO
3 0
w3
g ci
0 1 z
01 tizw
I I
f
I
Cl Z
o E
OZ
lJj
I
100
g8
0 13
J
NOI1d3
3
t
o
o
II nnj
gelth
1
8
10
8
l
8 1f
8
VI 3
g
i ib fs
10
I
Ij
T r
33 Y
I
rl t J r
TU
I I
A
j
If f8 I y ir ct Ji1 i D 1 liT fl
1 ILI I 1 1 I brJI1
I r 1
1 J1iilJI iliil llll J III I
I I I I j I
I lJj J1 I I r I 2 I lli I I
ill I ill I K
I I ij ii I i Zj I I I 0 I faULS
I I I I I I I I I 8
8
207
I
I
fl
Il q
h4
s
t L
J 1
I
IlOJ Iij
InJdi
J
5
1j1 Ii1J
J 1 f
1
l
i I
8
fDq
J
T p
R JJ0
a
TInii
IIIi 2
1 i
0
9It
9 1ilN
a
Ul
t
w
r
Ul
u
0
t
0
Z
t
w
r
Ul
g
S
Lf
hr J
f l
1
o 1 rI nnloJ
I v uu
a A St
II 3
W
o
q I w
Hn HH I
i r r3a
i 5 ii Uih1l2
d o8 9fi
Il I IemhhittfiO
g i
l haM
E g I w lf
i 01
II
I
I
I
I
I
I
I
i L
1
r t
1 1
1 1
MT 1
8 1
r r
1 1
I I
0 1 1
1 1
r 7 7
oJttjnt
1 1
1 1
r T 77
1 1
1 1
1 1ibl JDLtlMI7IiD
I I Ncr
t6 T n
1
8
o
1
en
o z
o
0uw
en ll I
Jg
f I
0 G
l
iUtUh
rB l
I I4
I s 3
11
208
5 a3
5
l
d
II
h i
iI JiJiIJJj1iI
i iIsioll II
i l I l j IszftliIIHdnfUdt1
11i I mlih 1
HFp IU li
i 1
i
1 i1lUJ
J 5ghi
i i
II i958fIJJW
0
pi01
1lI
h l toi
HQ thi AjWIUiii5tQhi5i
u e 5
g IM 1hiiwhigBIiIlgh
il
U
l
J
t 1
It
ci
z
t
W
I
Vl
en
o z
II iilt
J
n i
e
z
w
5 gij
i wI3gw
1
t
e
w
iDi
13
I
209
u
o5
S
e
i 9 t i
I il
i Jn I
S I r t
12 t
c
J 9IUQ i
i f
Mi if
e B h 1
I g 2d
ig I i lUgHa
t i
a
C
n
L
L
It
t te l
l p
t ei
l gI1J 1
t
I5
lli
f
t
w
0 I
Z f
0
Uw
e lL
0
l CO
C cizz
t
C w
I
f
en
o z
o
OZ
en m
I
o 5
J
1 nilIHi
J
efi
g
8
u
ii
g
210
i t 5
wH i
Iii
ui II 8 i i i 3
l r illh i 0 8
s i i Ii h i I h g
I I M i ili l II l Ii II i i l
h i u i I g m l
h e l I H Sf i t 8 i 11
wE
h i 8
i hl i M il i i i i U l Wi
i gi i5l
h t I H it M
l i e i H i i i a i i l t i I i
i
e
d
0 H l
il ill 111 li I ll ll j d I l i i j
g l i i li i g 1 i r i Ul1
I m I ig HiUiii i Ii II I l l l i
9 j
8 i ii 5 iIm
O lS yfi
64P
0 fiP
o 4Jl
I
Y
lI 4
442
r
l
IIiiiIt hIIitIU
I h
S U 2a
munm
t 4
t
l 10 cil
hh
8tE
l
fJS vJL
V
1 I Itii
l
J S I
JZ J
1 l
l j
3t3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
JZ a 0
JZc9
ct
ld Z
c Y jL
J i
s G5
j
J
I
JZCZ rLli
jC
J
fC
c
J 99
j
J 9i
0
J
u
93
1
1
I
1 1t
eJ CI of
l
I12Ai
J
J
t
ZJ
1
a
0
e
t 9
N
f
z Ij
o w
r
I Z f
35
o a
az
0 0 u
i 0
ifj to
iii
0 0 0
o a z
Ij
w
r
f
j
o z
o
OZ
j aJ 4
g
I 4
o 13
J
Ij i UId
I f1
L
Qtln
i
9 B
I
ll i
j 5 lW
i
1
3 d
0
211
0
I
F
3
11 8
o gu
li
I
1
t
I
I
I I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
n
I
w I
I
I
OJ I
I
I
I
j
o z
o
Oi
w
en
en
j rn
Jg
I
o J
I
212
o
m
o g
9
N
f
W0w
o c
f
Z
W co
LL
W 0
W
m
0iz
f
8
c
f
en
o
o
OZ
Jl
en
Z
I c
o G
J
II mt
ft
ffia
i
II tst
i
I
i
I 0
u
w
eg
213
o
l Z
g
WI
Z
8
WOO
w
1
OZ
n
i
e
n
nNui
WI
l e
e u
8
0
we
z
u
c
w
ZQttw
i7i
tl tl01 CO
I
mO LL
l 0
0
W
I tl 0
a z
ffi t
Ii W
i7i
CIJ
o z
o
02
m
CIJ JgE
b
214
Z
00ti
Z
0
mU
Z
0jOUW
1 0
OZi505
i F
o
Z
o
o
e b
b1
N
wl
bi
g
i
wous
5
toO e a
E
o
g
en
o z
o
1
I
enmg
I
o u
215
15
Fu
I
u
@
Z
f3
F U
U
B
U U
I
a it LagiV
lo l
V lL cr G
ill l
U e
I
t5 i
8 g
8 a
Jl n WZ
o ooJ
g
m Q
Il 05xzxzo
w wtj
I
oc
zuw
w UJ2
S
150 n
i3
w
lO OOIllnuzU
zuIIlwii5OWIwo8ow
e od
ii
u
o
@
Z N
sa I
5 8
tjt tj
8
oJ
za
F
z
i3 B e g
000 0 0
I O L
Ul 1
000
Jy
gz Qij
8 g g
I
ffiB
Jj
iS
t
C
d
IJ7n gl15
l t i
f12 i
g i d
W io 13
gl
0
n
Ii
0
m l0
J
t 9
N
UJ
W
C I
Z UJ
f z
5
D
D L
UJUJ 0
UJ
tl ZrCtUi ci
ol Z
u
w
I
UJ
z
o
F
U
o
u
11
en
o z
o Qijf
1
I
en rn
01
rn
f IoU
J
1 UilIUI
J
f1
216
J
Z
I
II
p
ili3i3
ni
21
o
8
Z N
j
in
z
0
Io
lll
f
z tJw
5 r
a
f
C
z
0 LL
i5 0
J
U
ol
0 0
z
UJ
0 tJ
w
r
f
is
t
tJ
e
15
ll
tJ
t
f J
I
I
I
C
o z
o
Q en
en
C eng
I
a G
J
II i hIIt
J
efi
217
mil
i L i lID
ll11
H
n
Ii
i
i III
I I ll
S I 0 1ii1pjJ11ollUIIa
5 I 2
I Uiil aIjmi
i oj
ig5 m
i g
CLtoU
g
siiIS Z
I ZlH i xQljtoof lOiiilfit0050d0
i i 0
l5t l
s 0 woi
w ti lk M f Zf
l a III ai Iil 5 3
i 1ij iiii8c to
H igl
NNN NN
20 III
l if
l
ktl
lill 4 g 2 0 1llHUiUHUli111811811fIII
00OJlfiUIIa
3 3
ii 1 ll h g 1 0
ot cIIIt
Om UflllllllllllllA CJ
i i
i
8
g 1i10
U oz o
i 1 gi
i g iiSi
g h jg8
i N
i
ma
j
I
1 1II l
H j i
c 183lJlIJfX sX HXS1 S71OHDIl W TWH J S3J OJrl
m tJJ
XlOlt Wnl tll I
JOOllo AllllrIIl
DO NOU lf3d
OJddVlMI Ill S 3ll TWHS
T13 1l 80N1 30HSlYl4QlH
s
jQ f 51 I H
3l JI6N1 01 b
cll JIlS Hl
Q 13f OJ J l3n J3S
38 OJ iJllYllQH
I J q p OJddD lllnlJj IIlUDJ H Itf
OiZ JIIod IInoJJalDM 10 UOjMllU8J dns lan eq 1I0 IIIUDJ H
gg
00 eo
c
l
o 2 1
i
m
I
H i
g
1j i Ii7Gi1i115iil
1 Hili IlItI
HS l li J woh51hIIEt5a5l
Hm llu
i tj
r 5 0
CL a
3
III
LL
10
iil
f
00UIIa
Z
g Tjg
CLotn
Z i
III
LL
1Ownl
ii1fIII
00UIIa
tn N
O JY 0
Uou 0
ZIOOf
U ID
III
LL
0
001181ufJ
lOJd
lS IPlI 6
I I
111 POIclwo
M
ig
ci
o
u
it
i
t i
l J l
n
a
f h
i
Uli it
f i
Ii
iif
5
i h15jiE s l
lli 1 iiIi1ii
i h ji
jj
1
I
1
3 3
w g
t
f
r
u
i
i
fJi
l
Z
i
0
t tl
m
ilt
hIi
lf
j
l li
3 i
11
1
t
il
ifu
J
S 8
e
i
i
w
iu
w0
z
a
0
0 5a
N
@
t
i
i
oi
1ll t1l 5rgtl
J1
ii
j
li8g
in
i
1jlit
h t
iIItw
I iiiHits illiiii12
ff jJ
hm
OJ
z
o
Z
z
o
u
w
uo
ii i
loJ h
w
5 u
lj
J
t
U
i
Ii 2
1 iWiflA
i l
l Ii tlj5
i j IllJil
ll iihH
i
to
69
gVlO
wo N
mo N
w80 CtCLZ i
III
LL
1o
1f
00UIIa
o
wzwjO 0OtotoN
f
o
j
o 1
III
LLt10iiIfIII00U
a
w
jaa
m
I0
1fIII
00UIIa
Owa
0
OI NZz
i o
III
U I000
118 IfIII
00UIIa
aw
u
5
za
w
0N
a
w
us
ti
III
LL
Ownl
iil
UIIa
0m
0 Ie
J
I N
f
t
W
r
f
C
lL
0
W
0
0
Z
t
w
r
f
J
o
N
C
o
o
OZ
C
lD Z
I
o 5
I
1 in
I Uh
J
Ii
i
i
Ul
g
t 5
r Offi
oi
Ii
h
h
218
8
I
i
8
m
I
8
dddlim0
i
l
iCL
N
Ii
i 1 1iI
IIIiil IIill
it
I
JziHlihil11Izltti1iozzH1n1itjhjIjilmtiHifj81illt
I
1e N
ifmnlirii011ijjI11HiIM
Ii
i i
1Mr
I I
Ih IiIjjm
l1
I
ji I
f1
iJiiiiJslfH6G01
li
jl niUllu
t
r dHi
lUh
r
Sft
i
Zl I f5jllliUiUiilrhi
fi1
f tUj8I
j Iftil
i H
thI8Ine2tit
J EttlJ1r8ii
ll l
E c
j
Z5
Frn togI
G n
ZU
0Ut
LL
0
11111
0
0
0
en
Zo
o
OZow1C1lCIl
enll
mz
I
o u
I
Z
0tnw
6
u
I IIz tnw I
I
p
I
Eh
0
3
n i
I IUIJJld
J
fi5
H ii
c
Hg1nHI
s
dioliliii
1 5121 2jiiiIlIlii8Jljr1leiiliiH1iolImiUHlHli
g2 lS
o
601
b
i
ii
t
O
i
i i
n
iiii
Hi
Hi
1 i
il
jljl
i j i
Iii
3f
i o
l t LJtlh
l
u
16
219
J 7
jS3J 0 i
i t
l I
J 17 iIojHv
I ION MS IaJOcI
I
j
fIii
tl2
N
z 1
H W
i i ii
i t
Il MIti
z Ii
H mIh
1 Vi
t7f
fd m inllIli
of
f i1i l l
d a
t 1lkiielIn6i3iSgluLJIi
c
I
Ii h 1111 9
o j l J S g 1
i S iI1 h ii i l
8 0 ilE l z
1
IB HH
l M ih i i i
df j
1 Ii
11
g I t
i fiil IIndIIIghIie
iljijl
0
@ j1ljfi
l
Ww II
Z ii
n s t 5N0
Iow
d Il I
CL 8 IiI
i Vi lullu
z
5i1 z
z
Ewi Il00g
r l I
00ulZI
I lI1
g 0Il I iu
Ii 0 0
0
w
u
w
0 NFn
z N
1 m
0
0
LLII1
0
00
lZIl00
U
oZZ I
z Q illNu
w J lw
g
f g ii iiII5
g
ll1iI g
0 r
00 Ijrl n
00 K
u iH 1 e 1jIl111illj
2j5
j lHl li
I
i ttI
l f
IIIIhIII
f I
a
o ObHZlUj
l i
H iIH i
o 1
I ldl 1
lii lfj
J
I
1i
I
1 l
t
1 l1OJIbHIZua
e
0
m g9
100N
f
W
I
f
en
lL
0
w
z 0 0
00 N
0 0 cinOzZ
00Wu
W
I
f
1
r
l 1iJ
0
ilun
H
0
z
Vi 0
m
N
0
IZ n
Uwi
0
UW
1LtlJ0
ri
u
Ii2
z
Qw
u 0Uzun
000
0
z5W
u
LLtl1
0iiI0
9
g
g
g
55
Uo
gj
w 0
i u 0
z
w
II LL
0il00
U
en
o
o
Os Qm
en
en
en
JIDZ
I l
o 15
J
I ij
I UhJ
li
ii
g i
o z
f
i ig
i 8
gi
i 1
J
e
e
50
OW
220
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www cLchanhassen mn us
1c
MEMORANDUM 0
TO Paul Oehme Director of Public Works City Engineer
FROM Joseph Shamla Project Engineer
DATE October 22 2007
SUBJ Lotus Woods Project No 07 14 Approve Development Contract and
Construction Plans and Specifications
Simple Majority Vote Required
The attached development contract incorporates the conditions of approval for the final
plat and construction plans and specifications A 380 924 50 financial security is
required to guarantee compliance with the terms of the development contract relating to
the installation of public streets and utilities one year of public street light operating
costs engineering surveying inspection landscaping and payment of special
assessments
The cash fees for this project total 57 081 10 A breakdown of the cash fee is shown on
Page SP 3 of the development contract No City funds are needed as part of this private
development project
The applicant has also submitted detailed construction plans and specifications for staff
review and City Council approval Staff requests that the City Council grant staff the
flexibility to administratively approve the plans after working with the applicants engineer
to modify the plans accordingly
Staff recommends that the construction plans and specifications for Lotus Woods dated
August 20 2007 prepared by Otto Associates Engineers and Land Surveyors Inc and
the development contract dated October 22 2007 be approved conditioned upon the
following
1 The applicant shall enter into the development contract and supply the City with a
cash escrows or letter of credits for 380 924 50 and pay a cash fee of 57 081 10
2 The applicant s engineer shall work with City staff in revising the construction plans to
meet City standards
Attachments 1
2
Development Contract dated October 22 2007
Construction plans and specifications are available for review in
the Engineering Department
c Otto Associates Engineers and Land Surveyors Inc
g eng projectsk o lotus woods approve dC doc
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play221
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
LOTUS WOODS
DEVELOPMENT CONTRACT
Developer Installed Improvements
222
TABLE OF CONTENTS
SPECIAL PROVISIONS PAGE
1 REQUEST FOR PLAT APPROVAL SP I
2 CONDITIONS OF PLAT APPROVAL SP I
3 DEVELOPMENT PLANS SP I
4 IMPROVEMENTS SP 2
5 TIME OF PERFORMANCE SP 2
6 SECURITy SP 2
7 NOTICE SP 3
8 OTHER SPECIAL CONDITIONS SP 3
9 GENERAL CONDITIONS SP 5
GENERAL CONDITIONS
1 RIGHT TO PROCEED GC I
2 PHASED DEVELOPMENT GC I
3 PRELIMINARY PLAT STATUS GC I
4 CHANGES IN OFFICIAL CONTROLS GC I
5 IMPROVEMENTS GC I
6 IRON MONUMENTS GC 2
7 LICENSE GC 2
8 SITE EROSION AND SEDIMENT CONTROL GC 2
8A EROSION CONTROL DURING CONSTRUCTION OF A DWELLING
OR OTHER BUILDING GC 2
9 CLEAN UP GC 3
10 ACCEPTANCE AND OWNERSHIP OF IMPROVEMENTS GC 3
11 CLAIMS GC 3
12 PARK DEDICATION GC 3
13 LANDSCAPING GC 3
14 WARRANTy GC 4
15 LOT PLANS GC 4
16 EXISTING ASSESSMENTS GC 4
17 HOOK UP CHARGES GC 4
18 PUBUC STREET LIGHTING GC 4
19 SIGNAGE GC 5
20 HOUSE PADS GC 5
21 RESPONSIBILITY FOR COSTS GC 5
22 DEVELOPER S DEFAULT GC 6
22 MISCELLANEOUS
A Construction Trailers GC 6
B Postal Service GC 7
C Third Parties GC 7
D Breach of Contract GC 7
1
223
E Severability GC 7
F Building Permits GC 7
G Waivers Amendments GC 7
H Release GC 7
I Insurance GC 7
J Remedies GC 8
K Assignability GC 8
L Construction Hours GC 8
M Noise Amplification GC 8
N Access GC 8
O Street Maintenance GC 8
P Storm Sewer Maintenance GC 9
Q Soil Treatment Systems GC 9
R Variances GC 9
S Compliance with Laws Ordinances and Regulations GC 9
T Proof of Title GC 9
U Soil Conditions GC l0
V Soil Correction GC l0
W Haul Routes GC l0
X Development Signs GC l0
Y Construction Plans GC l0
Z As Built Lot Surveys GC ll
11
224
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
Developer Installed hnprovements
LOTUS WOODS
SPECIAL PROVISIONS
AGREEMENT dated October 22 2007 by and between the CITY OF CHANHASSEN a
Minnesota municipal corporation the City and Lotus Woods lLC a Limited Liability
Company the Developer
1 Request for Plat Approval The Developer has asked the City to approve a plat for
Lotus Woods referred to in this Contract as the plat The land is legally described on the
attached Exhibit A
2 Conditions of Plat Approval The City hereby approves the plat on condition that
the Developer enter into this Contract furnish the security required by it and record the plat with
the County Recorder or Registrar of Titles within 30 days after the City Council approves the plat
3 Development Plans The plat shall be developed in accordance with the following
plans The plans shall not be attached to this Contract With the exception of Plan A the plans
may be prepared subject to City approval after entering the Contract but before commencement of
any work in the plat If the plans vary from the written terms of this Contract the written terms
shall control The plans are
Plan A Final plat approved October 22 2007 prepared by Otto Associates Engineers and
Land Surveyors Inc
Plan B Grading Drainage and Erosion Control Plan dated August 20 2007 prepared by
Otto Associates Engineers and Land Surveyors Inc
Plan C Plans and Specifications for hnprovements dated September 18 2007 prepared by
Otto Associates Engineers and Land Surveyors Inc
Plan D Landscape Plan dated August 20 2007 prepared by Otto Associates Engineers and
Land Surveyors Inc
D 1
225
4 Improvements The Developer shall install and pay for the following
A Sanitary Sewer System
B Water System
C Storm Water Drainage System
D Streets
E Concrete Curb and Gutter
F Street Lights
G Site GradingRestoration
H Underground Utilities e g gas electric telephone CATV
I Setting of Lot and Block Monuments
J Surveying and Staking
K Landscaping
L Erosion Control
5 Time of Performance The Developer shall install all required improvements
except for the wear course on public streets by November 15 2008 The Developer may however
request an extension of time from the City Engineer If an extension is granted it shall be
conditioned upon updating the security posted by the Developer to reflect cost increases and the
extended completion date
6 Security To guarantee compliance with the terms of this Contract payment of
special assessments payment of the costs of all public improvements and construction of all public
improvements the Developer shall furnish the City with a letter of credit in the form attached
hereto from a bank acceptable to the City or cash escrow security for 380 924 50 The
amount of the security was calculated as 110 of the following
Site GradingErosion ControlRestoration
Sanitary Sewer
Watermain
Storm Sewer Drainage System including cleaning and maintenance
Streets
Sub total Construction Costs
1 Street light 300 Each and 12 signs 250 Each
Engineering surveying and inspection 7 of construction costs
Landscaping 2 of construction costs
Sub total Other Costs
107 305
32 180
32 680
28 525
113 980
314 670
3 300
22 030
6 295
31 625
TOTAL COST OF PUBLIC IMPROVEMENTS 346 295
SECURITY AMOUNT 110 of Total Costs 380 924 50
QD
226
This breakdown is for historical reference it is not a restriction on the use of the security The
security shall be subject to the approval of the City The City may draw down the security without
notice for any violation of the terms of this Contract If the required public improvements are not
completed at least thirty 30 days prior to the expiration of the security the City may also draw it
down If the security is drawn down the draw shall be used to cure the default With City
approval the security may be reduced from time to time as financial obligations are paid but in no
case shall the security be reduced to a point less than 10 of the original amount until 1 all
improvements have been completed 2 iron monuments for lot comers have been installed 3 all
financial obligations to the City satisfied 4 the required record plans have been received by the
City 5 a warranty security is provided and 6 the public improvements are accepted by the City
7 Notice Required notices to the Developer shall be in writing and shall be either
hand delivered to the Developer its employees or agents or mailed to the Developer by registered
mail at the following address
Paul Eidsness
Lotus Woods LLC
4395 Trillium Lane West
Mound MN 55364
Phone 952 473 1925
Notices to the City shall be in writing and shall be either hand delivered to the City Manager or
mailed to the City by certified mail in care of the City Manager at the following address
Chanhassen City Hall 7700 Market Boulevard P O Box 147 Chanhassen Minnesota 55317
Telephone 952 227 1100
8 Other Special Conditions
A SECURITIES AND FEES
1 A 380 924 50 letter of credit or escrow for the developer installed improvements the
57 081 10 cash administration fee and the fully executed development contract must
be submitted and shall be submitted prior to scheduling a pre construction meeting The
cash fee was calculated as follows
Administrative Fee 3 of 314 670
Street Lighting Charge for electricity 1 light @ 300 00 light
Attorney fee for review and recording of final plat documents
GIS Fee 25 plat 10 parcel for 11 parcels
Surface Water Management Fee
Park Dedication Fee Waived due to land acquisition
Partial SewerWater Connection Fee Sewer Connection 500 001ot
Water 1 345 001ot x 8 lots Remaining balance due at building
permit
135 00
31 996 00
0 00
9440 10
300 00
450 00
14 760 00
Total Cash Fee 57 081 10
D
227
2 57 081 10 cash must be submitted before the final plat is recorded to pay for the
installation of the following street and traffic control signs
If the signs must be installed in frost conditions an additional 250 post must be paid by the
developer
B CONDITIONS OF APPROVAL
1 A wetland buffer 25 feet in width shall be maintained around all Manage 1 wetlands All
wetlands and wetland buffer areas shall be protected by silt fence during grading Wetland
buffer areas shall be preserved surveyed and staked in accordance with the City s wetland
ordinance The applicant shall install wetland buffer edge signs under the direction of City
staff before construction begins and shall pay the City 20 per sign Principal structures shall
maintain a setback of at least 30 feet from the wetland buffer edge accessory structures shall
maintain a setback of at least 15 feet from the wetland buffer edge The wetland buffer and
wetland buffer setback shall be shown on the plans
2 The applicant shall revise the plans to address the conditions of Carver County Soil and
Water District as follows The applicant shall note on the plan and or in the contract that the
contractor is responsible for the NPDES permit and will need to have an individual qualified
to complete weekly and after Yz inch rainfall event inspection reports A box will need to be
placed on site for these specific documents Also a diversion will need to be installed to take
storm water during construction to the sediment pond
3 Stable emergency overflows shall be provided for the proposed pond on site The emergency
overflows shall be clearly labeled on the plan and a detail shall be provided
4 All riprap fabric at the flared end section shall be installed within 24 hours of flared end
section installation
5 The ditch section west of Carver Beach Road that receives stormwater from the stormwater
pond shall be stable prior to receiving discharge from the site
6 Erosion control blanket shall be installed on all slopes greater than or equal to 3 1 All
exposed soil areas shall have temporary erosion protection or permanent cover year round
according to the following table of slopes and time frames
Type of Slope
Steeper than 3 1
10 1 to 3 1
Flatter than 10 1
Time
7 days
14 days
21 days
Maximum time an area can
remain open when the area
is not actively being worked
These areas include constructed storm water management pond side slopes and any exposed
soil areas with a positive slope to a storm water conveyance system such as a curb and gutter
D II
228
system storm sewer inlet temporary or permanent drainage ditch or other natural or man
made systems that discharge to a surface water
7 Manholes with two foot sumps shall be installed as the last road accessible structures prior to
discharge into the stormwater pond
8 Chanhassen Type 2 Heavy Duty silt fence shall be installed around all wetlands streams
creeks bluffs and ravines Chanhassen Type 1 silt fence shall be used around the remaining
areas
9 A temporary sediment basin shall be constructed prior to disturbing upslope areas The areas
of temporary sediment basins shall be labeled on the plan A temporary outlet structure e g
a perforated riser and rock cone shall be provided for the pond a detail shall be provided
10 Inlet controls are needed for all inlets throughout the project and shall be installed within 24
hours of inlet installation prior to casting Filter fabric held down by steel plates with 12
inches of inch rock over each cover may be used Once casting of inlets takes place inlet
controls shall be installed within 24 hours Inlet protection shall be maintained on a regular
basis For all inlet protection devices details shall be provided in the plan and in the
SWPPP
11 Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as needed
12 The total SWMP fee due payable to the City at the time of final plat recording is 31 996 00
This fee was calculated assuming that the developer will install a storm water pond and an
outlet structure allowing a credit of 2 500 Should expansion of the regional pond occur prior
to construction of the proposed on site pond the fee will be increased to 34496
13 The applicant shall apply for and obtain permits from the appropriate regulatory agencies
ie Riley Purgatory Bluff Creek Watershed District Minnesota Pollution Control Agency
and comply with their conditions of approval
14 Applicant shall submit a landscaping plan showing 72 trees as replacement plantings All
trees shall be native species Plan shall specify size species and locations The applicant
shall work with staff to re distribute the quantity of trees on each lot or reduce the total
number of trees to be planted by donating the value of the non planted trees to the city tree
planting fund
15 All areas outside of grading limits shall be protected by tree preservation fencing Fencing
shall be installed prior to grading and excavation for homes on each lot Any trees shown as
preserved on plans dated revised on 5 112007 must be replaced at a rate of 2 1 diameter
inches if removed
16 No grading shall be allowed on Outlot A
D
229
17 A minimum of two overstory trees shall be planted in the front yards of Lots 1 8 Block 1
18 All structures within the proposed right of way or within the required setback of Block 2
must be removed
19 Building Official Conditions
a A final grading plan and soils report must be submitted to the Inspections Division before
building permits will be issued
b Demolition permits must be obtained prior to demolishing any structures on the site
c Retaining walls more than four feet high must be designed by a professional engineer and
a building permit must be obtained prior to construction
d Separate sewer and water services must be provided to each lot
e Any existing wells and on site sewage treatment systems on the site must be abandoned
in accordance with State Law and City Code
20 Fire Marshal conditions
a A lO foot clear space must be maintained around fire hydrants i e street lamps trees
shrubs bushes Xcel Energy Qwest cable TV and transformer boxes This is to ensure
that fire hydrants can be quickly located and safely operated by firefighters
b Fire apparatus access roads and water supply for fire protection is required to be installed
Such protection shall be installed and made serviceable prior to and during the time of
construction except when approved alternate methods of protection are provided
c No burning permits shall be issued for trees to be removed Trees and shrubs must either
be removed from site or chipped
d Fire apparatus access roads shall be designed and maintained to support the imposed load
of fire apparatus and shall be serviced so as to provide all weather driving capabilities
Pursuant to Minnesota State Fire Code Section 503 2 3
e Fire hydrant locations are acceptable
f Proposed street name is acceptable
g Temporary street signs shall be installed at street intersections once construction of the
new roadway allows passage of vehicles Pursuant to 2002 Minnesota Fire Code Section
5014
21 Outlot A shall be deeded to the City in lieu of payment of park dedication fees
22 Revise Sheet 2 of 16 to show House Type C on Lot 1 Block 1
23 The two accessory structures along Lotus Woods Drive must be removed before grading
commences A plan is needed to allow all the existing homeowners access to their properties
until the completion of construction The existing driveways west of Lotus Woods Drive will
need to be removed upon completion of Lotus Woods Drive Building permits will not be
issued until the driveways west of Lotus Woods Drive are removed
p h
230
24 A rational method drainage map needs to be submitted along with revised calculations
showing the two additional drainage structures
25 The pond outlet needs to be revised The City is working on a feasibility study for the
expansion of the regional pond in Triple Crown Estates If the City determines that the
regional pond can be altered to accommodate the runoff from the Lotus Woods Development
the storm sewer that discharges into the proposed pond in Lotus Woods should be revised to
enter the regional pond If the storm sewer is revised to drain into the regional pond the
pond in Lotus Woods development would be filled Revise the storm sewer so that it can
outlet to the ditch in Triple Crown Estates now but can be re routed to the pond in Triple
Crown Estates if the feasibility study determines that the Triple Crown Estates Pond can be
revised to have sufficient capacity Revise drainage calculations if the outlet changes alter
the calculations
26 A revised grading plan will be needed to address the following issues
a The lowest openings of houses must be three feet above the ordinary high water level or
one foot above the emergency overflow
b Lots 2 and 4 Block 1 elevations need to be revised if they are indeed walkouts
c The slopes of the driveways on Lots 6 and 8 Block 1 appear to be more than the 10
maximum and need to be revised
d Spot elevations must be shown at each proposed intersection to ensure the curb line has a
5 minimum slope
e Ground i e non paved surface grades shall not be less than 2 All emergency
overflows must be shown on the plan More contour labels are needed Also please turn
off the tree layer so it is easier to read the grading plan
27 An easement is required from the appropriate property owner for any off site grading A
temporary construction easement will be needed for the installation of the manhole on Lot 1
of Big Woods on Lotus Lake If importing or exporting material for development of the site
is necessary the applicant will be required to supply the City with detailed haul routes
28 The existing retaining wall in the southwest comer of the site must be removed before or
during construction of the pond A building permit is required for all retaining walls four feet
tall or higher and must be designed by a Structural Engineer registered in the State of
Minnesota
29 The watermain extension from Fox Hill Drive must be wet tapped Due to the alignment of
the watermain in Fox Hill Drive it appears that this connection cannot be done under traffic
The watermain connection on Big Woods Boulevard shall connect to the provided stub and
take place under traffic The sanitary sewer connection on Big Woods Boulevard connecting
to an existing stub shall be completed under traffic
30 Sewer and water services for Lots 7 and 8 were provided with Project 75 04 Revise plans to
show connections to these services
p 7
231
31 Each new lot is subject to the sanitary sewer and water hookup charges The 2007 trunk
hookup charge is 1 669 for sanitary sewer and 4485 for watermain The developer shall
pre pay 500 of the SAC fee and 1 345 of the WAC fee The remainder of the sanitary
sewer and watermain hookup fees may be specially assessed against the parcel at the time of
building permit issuance All of these charges are based on the number of SAC units
assigned by the Met Council and are due at the time of building permit issuance
32 All of the utility improvements are required to be constructed in accordance with the City s
latest edition of Standard Specifications and Detail Plates The applicant is also required to
enter into a development contract with the City and supply the necessary financial security in
the form of a letter of credit or cash escrow to guarantee installation of the improvements and
the conditions of final plat approval The applicant must be aware that all public utility
improvements will require a preconstruction meeting before building permit issuance
Permits from the appropriate regulatory agencies will be required induding the MPCA
Dept of Health Carver County and the Watershed District
33 The sanitary sewer easement will need to be changed from 20 feet to 30 feet to ensure proper
access for maintenance of this line The actual location of the watermain and the easement
must be shown to determine if the easement is sufficient
34 The site distance for turning onto Fox Hill Drive must be verified A speed warning sign
shall be installed by the developer on Fox Hill Drive based on the calculations of the sight
distance by his engineer Upon project completion the applicant shall submit a set of as
built plans signed by a professional civil engineer
35 Any lot that depends on the grading of another lot for proper drainage must be graded by the
developer during road construction This will allow each lot to be built at any time without
the need to sequence The tree preservation fence must be installed by the developer and
remain until the completion of the house
36 Provide a set of catch basins to be installed between Lots 3 and 4
37 Provide drain tile connections to Lots 3 4 5 6 and 7 per section 18 404 of the Chanhassen
City Code
38 Show wetland buffer setback on the grading plan
39 The proposed street name must be approved by the Chanhassen Fire Marshal
40 Construction plans must be signed by a professional engineer licensed in the State of
Minnesota
9 General Conditions The general conditions of this Contract are attached as
Exhibit B and incorporated herein
p Q
232
CITY OF CHANHASSEN
BY
Thomas A Furlong Mayor
SEAL
AND
Todd Gerhardt City Manager
Lotus Woods LLC
BY
Paul Eidsness President
STATE OF MINNESOTA
ss
COUNTY OF CARVER
The foregoing instrument was acknowledged before me this day of
2005 by Thomas A Furlong Mayor and by Todd Gerhardt City Manager of the City of
Chanhassen a Minnesota municipal corporation on behalf of the corporation and pursuant to the
authority granted by its City Council
NOTARY PUBLIC
STATE OF MINNESOTA
ss
COUNTY OF
The foregoing instrument was acknowledged before me this day of
2005 by Paul Eidsness President of Lotus Woods a Limited Liability Company on behalf of the
company
NOTARY PUBLIC
DRAFTED BY
City of Chanhassen
7700 Market Boulevard
P O Box 147
Chanhassen MN 55317
952 227 1100
D 0
233
EXHIBIT A
TO
DEVELOPMENT CONTRACT
LEGAL DESCRIPTION OF SUBJECT PROPERTY
LANG
That part of Government Lot 8 Section 1 Township 116 Range 23 described as follows
Beginning at a point in the center line of Lakeview Drive distant 221029 feet Southeasterly
from the point of intersection of the center line of said Lakeview Drive with the Center line of
Fern Road thence North 79 degrees 37 minutes East 611 feet thence North 75 degrees 07
minutes East 248 5 feet more or less to the high water mark of Long Lake also known as Lotus
Lake thence Southerly along the high water mark of said lake to the South line of said Section
1 thence North 89 degrees 31 minutes 29 seconds West along the South line of said Section 1 a
distance of 950 feet more or less to a point in the center line of said Lakeview Drive distant
243 518 feet on a bearing of South 22 degrees 21 minutes 40 seconds East from the point formed
by the intersection of the center line of said Lakeview Drive and Fern Road thence along the
center line of said Lakeview Drive on a bearing North 22 degrees 21 minutes 40 seconds West a
distance of 22489 feet to the point of beginning Above mentioned Lakeview Drive and Fern
Road being shown on the plat of CARVER BEACH on file and of record in the Office of the
Registrar of Titles in and for Carver County Minnesota Certificate of Title No 27313
AMICK
That part of Government Lot 8 in Section 1 Township 116 Range 23 described as follows
Beginning at a point in the center line of Lakeview Drive distant 121029 feet Southeasterly
from the point of intersection of the center line of said Lakeview Drive with the center line of
Fern Road thence Southeasterly along the center line of said Lakeview Drive 25 feet thence
North 75 degrees 07 minutes East to the high water mark of Long Lake also known as Lotus
Lake thence Northerly along the high water mark of said lake 25 feet more or less to its
intersection with a line bearing North 75 degrees 07 minutes East from the point of beginning
thence South 75 degrees 07 minutes West 866 5 feet more or less to point of beginning Above
mentioned Lakeview Drive and Fern Road being shown on the plat of CARVER BEACH on file
and of record in the office of the Registrar of Titles in and for Carver County Minnesota
Subject to an easement granted to the Northern Sates Power Company July 22od 1941
Beginning at a point in the center line of Lakeview Drive distant 20 172 feet on a bearing of
South 22 degrees 21 minutes 40 seconds East from the point formed by the intersection of said
Lakeview Drive and Fern Road as shown on the map entitled Map of Carver Beach according
to the plat thereof on file and of record in the office of the Registrar of Titles for said County of
Carver and state of Minnesota and running from thence along the Southerly line of Fern Road on
a bearing of North 75 degrees 07 minutes 00 seconds East a distance of 880 plus or minus foot
234
to the high water mark of Long Lake thence in a Southerly direction along the high water mark
of said Long Lake 100 plus or minus feet to a point 100 feet at right angles to the first course
when said course is projected thence on a course of South 75 degrees 07 minutes 00 seconds
West a distance of 873 feet plus or minus to a point in the center line of Lakeview Drive distant
121 029 feet in a Northwesterly direction from the intersection of Lakeview Drive and Fern
Road thence along the center line of Lakeview Drive on a course of North 22 degrees 21
minutes 40 seconds West a distance of 100 857 feet to the point of beginning Containing 2 03
acres plus or minus Certificate of Title No 21186
EIDSNESS
Outlot A BIG WOODS ON LOTUS LAKE Carver County Minnesota according to the recorded plat
thereof Certificate of Title No 29105
AND
That part of Government Lot 6 Section 12 Township 116 Range 23 Carver County Minnesota
described as follows
Beginning at a point in the center line of Lakeview Drive distant 243 518 feet on a bearing of
South 22 degrees 21 minutes 40 seconds East from the point formed by the intersection of the
center lines of Fern Road and Lakeview Drive as designated and delineated on the Map of
Carver Beach at Long Lake according to the plat thereof on file and of record in the office of
the Registrar of Titles in and for said County and State of Minnesota and running from thence
South 89 degrees 31 minutes 29 seconds East 950 feet plus or minus in and along the division
line between Section 1 and 12 of Carver County to the high water mark of Long Lake thence in
a Southeasterly direction along the high water mark of Long Lake 115 feet plus or minus to a
point 100 feet at right angles to the first course when said course is projected Easterly thence
Northerly 89 degrees 31 minutes 29 seconds West 965 feet plus or minus to the center line of
Lakeview Drive thence North 22 degrees 21 minutes 40 seconds West 108 505 feet to the point
of beginning being a part of Government Lot No 6 Section 12 Township 116 Range 23 same
being registered land as evidence by Certificate of title No 1726 Carver County State of
Minnesota Certificate of Title No 26940
That lies Westerly of a line described as follows
Commencing at a point in the center line of Lakeview Drive distant 243 518 feet on a bearing of
South 22 degrees 21 minutes 40 seconds East from the point formed by the intersection of the
center lines of Fern Road and Lakeview Drive as designated and delineated on the Map of
Carver Beach at Long Lake according to the plat thereof on file and of record in the office of
the Registrar of Titles in and for said County and State of Minnesota and running from thence
South 89 degrees 31 minutes 29 seconds East along the North line of said Section 12 a distance
of 530 06 feet to the point of beginning of said line to be described thence South 03 degrees 01
minutes 32 seconds East to a point 100 00 feet at right angles from the South Line of said Section
1 and said line there terminating
235
CERVILLA
Beginning at a point in the center line of Lakeview Drive distant 121029 feet in a Southeasterly
direction from the intersection of Lakeview Drive and Fern Road and running from thence on a bearing
of North 75 degrees 07 minutes 00 seconds East a distance of873 feet plus or minus to the high water
mark of Long Lake thence in a Southerly direction along the high water mark of Long Lake to a point
distant 375 feet at right angles to the first course when said course is projected thence on a course of
North 89 degrees 31 minutes 29 seconds West which is also the division line between Sections 1 and 12
of Carver County a distance of 950 feet plus or minus to a point in the center line of Lakeview Drive
Distant 243 518 feet on a bearing of South 22 degrees 21 minutes 40 seconds East from the point formed
by the intersection of the center line of Lakeview Drive and Fern Road thence along the center line of
Lakeview Drive on a bearing of North 22 degrees 11 minutes 40 seconds West a distance of 122 feet
plus or minus to the point or place of beginning containing 5 17 acres plus or minus as shown on a map
entitled CARVER BEACH according to the plat thereof on file and of record in the office of the
Registrar of Titles for said County of Carver and State of Minnesota Subject to an easement granted to
the Northern States Power Company July 22 1941
Excepting therefrom That part of Government Lot 8 in Section 1 Township 116 Range 23 described
as follows Beginning at a point in the center line of Lakeview Drive distant 121029 feet Southeasterly
from the point of intersection of the center line of said Lakeview Drive with the center line of Fern Road
thence Southeasterly along the center line of said Lakeview Drive 25 feet thence North 75 degrees 07
minutes East to the high water mark of Long lake also known as Lotus Lake thence Northerly along the
high water mark of said lake 25 feet more or less to its intersection with a line bearing North 75 degrees
07 minutes East from the point of beginning thence South 75 degrees 07 minutes West 866 5 feet more
or less to point of beginning Above mentioned Lakeview Drive and Fern Road being shown on the plat
of CARVER BEACH on file and of record in the office of the Registrar of Titles in and for Carver
County Minnesota Subject to an easement granted to the Northern States Power Company July 22
1941
Also Excepting Therefrom That part of Government Lot 8 in Section 1 Township 116 Range 23
described as follows
Beginning at a point in the center line of Lakeview Drive distant 221 029 feet Southeasterly from
the point of intersection of the center line of said Lakeview Drive with the center line of Fern
Road thence North 79 degrees 37 minutes East 611 feet thence North 75 degrees 07 minutes
East 248 5 feet more or less to the high water mark of Long Lake also known as Lotus Lake
thence Southerly along the high water mark of said Lake to the South line of said Section 1
thence North 89 degrees 31 minutes 29 seconds West along the South line of said Section 1 a
distance of 950 feet more or less to a point in the center line of said Lakeview Drive distant
243 518 feet on a bearing of South 22 degrees 21 minutes 40 seconds East from the point formed
by the intersection of the center line of said Lakeview Drive and Fern Road thence along the
center line of said Lakeview Drive on a bearing North 22 degrees 21 minutes 40 seconds West a
distance of 22489 feet to the point of beginning Above mentioned Lakeview Drive and Fern
Road being shown on the plat of CARVER BEACH on file and of record in the Office of the
Registrar of Titles in and for Carver County Minnesota Subject to an easement granted to the
Northern States Power Company July 22 1941 Certificate of Title No 27961
236
MORTGAGE HOLDER CONSENT
TO
DEVELOPMENT CONTRACT
which holds a mortgage on the subject property the development of which is governed by the
foregoing Development Contract agrees that the Development Contract shall remain in full force
and effect even if it forecloses on its mortgage
Dated this day of 20
STATE OF MINNESOTA
ss
COUNTY OF
The foregoing instrument was acknowledged before me this day of
20 by
NOTARY PUBLIC
DRAFTED BY
City of Chanhassen
7700 Market Boulevard
P O Box 147
Chanhassen MN 55317
952 227 1100
237
FEE OWNER CONSENT
TO
DEVELOPMENT CONTRACT
fee owners of all or part of the subject property the development of which is governed by the
foregoing Development Contract affirm and consent to the provisions thereof and agree to be
bound by the provisions as the same may apply to that portion of the subject property owned by
them
Dated this day of 20
STATE OF MINNESOTA
ss
COUNTY OF
The foregoing instrument was acknowledged before me this day of
20 by
NOTARY PUBLIC
DRAFTED BY
City of Chanhassen
7700 Market Boulevard
P O Box 147
Chanhassen MN 55317
952 227 1100
238
IRREVOCABLE LETTER OF CREDIT
No
Date
TO City of Chanhassen
7700 Market Boulevard Box 147
Chanhassen Minnesota 55317
Dear Sir or Madam
We hereby issue for the account of
Irrevocable Letter of Credit in the amount of
on the undersigned bank
Name of Developer and in your favor our
available to you by your draft drawn on sight
The draft must
a Bear the clause Drawn under Letter of Credit No
2 of Name of Bank
dated
b Be signed by the Mayor or City Manager of the City of Chanhassen
c Be presented for payment at
2
Address of Bank on or before 4 00 p m on November 30
This Letter of Credit shall automatically renew for successive one year terms unless at least forty
five 45 days prior to the next annual renewal date which shall be November 30 of each year the Bank
delivers written notice to the Chanhassen City Manager that it intends to modify the terms of or cancel this
Letter of Credit Written notice is effective if sent by certified mail postage prepaid and deposited in the
U S Mail at least forty five 45 days prior to the next annual renewal date addressed as follows
Chanhassen City Manager Chanhassen City Hall 7700 Market Boulevard P O Box 147 Chanhassen MN
55317 and is actually received by the City Manager at least thirty 30 days prior to the renewal date
This Letter of Credit sets forth in full our understanding which shall not in any way be modified
amended amplified or limited by reference to any document instrument or agreement whether or not
referred to herein
This Letter of Credit is not assignable This is not a Notation Letter of Credit More than one draw
may be made under this Letter of Credit
This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and
Practice for Documentary Credits mternational Chamber of Commerce Publication No 500
We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly
honored upon presentation
BY
Its
239
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
Developer Installed Improvements
EXHIBIT B
GENERAL CONDITIONS
1 Right to Proceed Within the plat or land to be platted the Developer may not
grade or otherwise disturb the earth remove trees construct sewer lines water lines streets
utilities public or private improvements or any buildings until all the following conditions have
been satisfied 1 this agreement has been fully executed by both parties and filed with the City
Clerk 2 the necessary security and fees have been received by the City 3 the plat has been
recorded with the County Recorder s Office or Registrar of Title s Office of the County where the
plat is located and 4 the City Engineer has issued a letter that the foregoing conditions have been
satisfied and then the Developer may proceed
2 Phased Development If the plat is a phase of a multiphased preliminary plat the
City may refuse to approve final plats of subsequent phases if the Developer has breached this
Contract and the breach has not been remedied Development of subsequent phases may not
proceed until Development Contracts for such phases are approved by the City Park charges and
area charges for sewer and water referred to in this Contract are not being imposed on outlots if
any in the plat that are designated in an approved preliminary plat for future subdivision into lots
and blocks Such charges will be calculated and imposed when the outlots are final platted into lots
and blocks
3 Preliminary Plat Status If the plat is a phase of a multi phased preliminary plat
the preliminary plat approval for all phases not final platted shall lapse and be void unless final
platted into lots and blocks not outlots within two 2 years after preliminary plat approval
4 Changes in Official Controls For two 2 years from the date of this Contract no
amendments to the City s Comprehensive Plan except an amendment placing the plat in the current
urban service area or official controls shall apply to or affect the use development density lot size
lot layout or dedications of the approved plat unless required by state or federal law or agreed to in
writing by the City and the Developer Thereafter notwithstanding anything in this Contract to the
contrary to the full extent permitted by state law the City may require compliance with any
amendments to the City s Comprehensive Plan official controls platting or dedication requirements
enacted after the date of this Contract
5 Improvements The improvements specified in the Special Provisions of this
Contract shall be installed in accordance with City standards ordinances and plans and
specifications which have been prepared and signed by a competent registered professional
GC l
240
engineer furnished to the City and approved by the City Engineer The Developer shall obtain all
necessary permits from the Metropolitan Council Environmental Services and other pertinent
agencies before proceeding with construction The City will at the Developer s expense have one
or more construction inspectors and a soil engineer inspect the work on a full or part time basis
The Developer shall also provide a qualified inspector to perform site inspections on a daily basis
Inspector qualifications shall be submitted in writing to the City Engineer The Developer shall
instruct its project engineer inspector to respond to questions from the City Inspector s and to
make periodic site visits to satisfy that the construction is being performed to an acceptable level of
quality in accordance with the engineer s design The Developer or his engineer shall schedule a
preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties
concerned including the City staff to review the program for the construction work
6 Iron Monuments Before the security for the completion of utilities is released all
monuments must be correctly placed in the ground in accordance with Minn Stat 505 02 Subd
1 The Developer s surveyor shall submit a written notice to the City certifying that the monuments
have been installed
7 License The Developer hereby grants the City its agents employees officers and
contractors a license to enter the plat to perform all work and inspections deemed appropriate by the
City in conjunction with plat development
8 Site Erosion and Sediment Control Before the site is rough graded and before
any utility construction is commenced or building permits are issued the erosion and sediment
control plan Plan B shall be implemented inspected and approved by the City The City may
impose additional erosion and sediment control requirements if they would be beneficial All areas
disturbed by the excavation and backfilling operations shall be reseeded forthwith after the
completion of the work in that area Except as otherwise provided in the erosion and sediment
control plan seed shall be certified seed to provide a temporary ground cover as rapidly as possible
All seeded areas shall be fertilized mulched and disc anchored as necessary for seed retention
The parties recognize that time is of the essence in controlling erosion and sediment transport If
the Developer does not comply with the erosion and sediment control plan and schedule of
supplementary instructions received from the City the City may take such action as it deems
appropriate to control erosion and sediment transport at the Developer s expense The City will
endeavor to notify the Developer in advance of any proposed action but failure of the City to do so
will not affect the Developer s and City s rights or obligations hereunder No development will be
allowed and no building permits will be issued unless the plat is in full compliance with the erosion
and sediment control requirements Erosion and sediment control needs to be maintained until
vegetative cover has been restored even if construction has been completed and accepted After
the site has been stabilized to where in the opinion of the City there is no longer a need for erosion
and sediment control the City will authorize the removal of the erosion and sediment control i e
hay bales and silt fence The Developer shall remove and dispose of the erosion and sediment
control measures
GC 2241
Sa Erosion Control During Construction of a Dwelling or Other Building Before
a building permit is issued for construction of a dwelling or other building on a lot a 500 00 cash
escrow or letter of credit per lot shall also be furnished to the City to guarantee compliance with
City Code S 7 22
9 Clean up The Developer shall maintain a neat and orderly work site and shall daily
clean on and off site dirt and debris including blowables from streets and the surrounding area
that has resulted from construction work by the Developer its agents or assigns
10 Acceptance and Ownership of Improvements Upon completion and acceptance
by the City of the work and construction required by this Contract the improvements lying within
public easements shall become City property After completion of the improvements a
representative of the contractor and a representative of the Developer s engineer will make a final
inspection of the work with the City Engineer Before the City accepts the improvements the City
Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved
plans and specifications and the Developer and his engineer shall submit a written statement to the
City Engineer certifying that the project has been completed in accordance with the approved plans
and specifications The appropriate contractor waivers shall also be provided Pinal acceptance of
the public improvements shall be by City Council resolution
11 Claims In the event that the City receives claims from laborers materialmen or
others that work required by this Contract has been performed the sums due them have not been
paid and the laborers materialmen or others are seeking payment out of the financial guarantees
posted with the City and if the claims are not resolved at least ninety 90 days before the security
required by this Contract will expire the Developer hereby authorizes the City to commence an
Interpleader action pursuant to Rule 22 Minnesota Rules of Civil Procedure for the District Courts
to draw upon the letters of credit in an amount up to 125 of the claim s and deposit the funds in
compliance with the Rule and upon such deposit the Developer shall release discharge and
dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the
District Court except that the Court shall retain jurisdiction to determine attorneys fees
12 Park Dedication The Developer shall pay full park dedication fees in conjunction
with the installation of the plat improvements The park dedication fees shall be the current amount
in force at the time of final platting pursuant to Chanhassen City Ordinances and City Council
resolutions
13 Landscaping Landscaping shall be installed in accordance with Plan D Unless
otherwise approved by the City trees not listed in the City s approved tree list are prohibited The
minimum tree size shall be two and one half 2Y2 inches caliper either bare root in season or
balled and burlapped The trees may not be planted in the boulevard area between curb and
property line In addition to any sod required as a part of the erosion and sediment control plan
Plan B the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each
lot utilizing a minimum of four 4 inches of topsoil as a base Seed or sod shall also be placed on
all disturbed areas of the lot If these improvements are not in place at the time a certificate of
GC 3
242
occupancy is requested a financial guarantee of 750 00 in the form of cash or letter of credit shall
be provided to the City These conditions must then be complied with within two 2 months after
the certificate of occupancy issued except that if the certificate of occupancy is issued between
October 1 through May 1 these conditions must be complied with by the following July 1st Upon
expiration of the time period inspections will be conducted by City staff to verify satisfactory
completion of all conditions City staff will conduct inspections of incomplete items with a 50 00
inspection fee deducted from the escrow fund for each inspection After satisfactory inspection the
financial guarantee shall be returned If the requirements are not satisfied the City may use the
security to satisfy the requirements The City may also use the escrowed funds for maintenance of
erosion control pursuant to City Code Section 7 22 or to satisfy any other requirements of this
Contract or of City ordinances These requirements supplement but do not replace specific
landscaping conditions that may have been required by the City Council for project approval
14 Warranty The Developer warrants all improvements required to be constructed by
it pursuant to this Contract against poor material and faulty workmanship The Developer shall
submit either 1 a warranty maintenance bond for 100 of the cost of the improvement or 2 a
letter of credit for twenty five percent 25 of the amount of the original cost of the
improvements
A The required warranty period for materials and workmanship for the utility
contractor installing public sewer and water mains shall be two 2 years from the date of final
written City acceptance of the work
B The required warranty period for all work relating to street construction including
concrete curb and gutter sidewalks and trails materials and equipment shall be subject to two 2
years from the date of final written acceptance
C The required warranty period for sod trees and landscaping is one full growing
season following acceptance by the City
15 Lot Plans Prior to the issuance of building permits an acceptable Grading
Drainage Erosion Control including silt fences and Tree Removal Plan shall be submitted for each
lot for review and approval by the City Engineer Each plan shall assure that drainage is maintained
away from buildings and that tree removal is consistent with development plans and City
Ordinance
16 Existing Assessments Any existing assessments against the plat will be re spread
against the plat in accordance with City standards
17 Hook up Charges The Developer also acknowledges overall sanitary sewer and
water trunk availability to the site and the hook up charges established by the City as reasonable
compensation for oversizing costs previously incurred as well as long term maintenance Said
hook up charges are collectible at time of building permit unless awritten request is made to assess
GC 4243
the costs over a four year term at the rates in effect at time of application If paid with the building
permit the party applying for the building permit is responsible for payment of these fees
18 Public Street Lighting The Developer shall have installed and pay for public
street lights in accordance with City standards The public street lights shall be accepted for City
ownership and maintenance at the same time that the public street is accepted for ownership and
maintenance A plan shall be submitted for the City Engineer s approval prior to the installation
Before the City signs the final plat the Developer shall pay the City a fee of 300 00 for each street
light installed in the plat The fee shall be used by the City for furnishing electricity and
maintaining each public street light for twenty 20 months
19 Signage All street signs traffic signs and wetland monumentation required by the
City as a part of the plat shall be furnished and installed by the City at the sole expense of the
Developer
20 House Pads The Developer shall promptly furnish the City as built plans
indicating the amount type and limits of fill on any house pad location
21 Responsibility for Costs
A The Developer shall pay an administrative fee in conjunction with the
installation of the plat improvements This fee is to cover the cost of City Staff time and overhead
for items such as review of construction documents preparation of the Development Contract
monitoring construction progress processing pay requests processing security reductions and final
acceptance of improvements This fee does not cover the City s cost for construction inspections
The fee shall be calculated as follows
i if the cost of the construction of public improvements is less than 500 000
three percent 3 of construction costs
ii if the cost of the construction of public improvements is between 500 000
and 1 000 000 three percent 3 of construction costs for the first
500 000 and two percent 2 of construction costs over 500 000
iii if the cost of the construction of public improvements is over 1 000 000
two and one half percent 21f2 of construction costs for the first 1 000 000
and one and one half percent 1 Y2 of construction costs over 1 000 000
Before the City signs the final plat the Developer shall deposit with the City a fee based upon
construction estimates After construction is completed the final fee shall be determined based
upon actual construction costs The cost of public improvements is defined in paragraph 6 of the
Special Provisions
GC 5244
B In addition to the administrative fee the Developer shall reimburse the City for
all costs incurred by the City for providing construction and erosion and sediment control
inspections This cost will be periodically billed directly to the Developer based on the actual
progress of the construction Payment shall be due in accordance with Article 2IE of this
Agreement
C The Developer shall hold the City and its officers and employees harmless from
claims made by itself and third parties for damages sustained or costs incurred resulting from plat
approval and development The Developer shall indemnify the City and its officers and employees
for all costs damages or expenses which the City may payor incur in consequence of such claims
including attorneys fees
D In addition to the administrative fee the Developer shall reimburse the City for
costs incurred in the enforcement of this Contract including engineering and attorneys fees
E The Developer shall pay in full all bills submitted to it by the City for obligations
incurred under this Contract within thirty 30 days after receipt If the bills are not paid on time
the City may halt all plat development work and construction including but not limited to the
issuance of building permits for lots which the Developer mayor may not have sold until the bills
are paid in full Bills not paid within thirty 30 days shall accrue interest at the rate of 8 per year
F In addition to the charges and special assessments referred to herein other
charges and special assessments may be imposed such as but not limited to sewer availability
charges SAC City water connection charges City sewer connection charges and building
permit fees
G Private Utilities The Developer shall have installed and pay for the installation
of electrical natural gas telephone and cable television service in conjunction with the overall
development improvements These services shall be provided in accordance with each of the
respective franchise agreements held with the City
H The developer shall pay the City a fee established by City Council resolution
to reimburse the City for the cost of updating the City s base maps GIS data base files and
converting the plat and record drawings into an electronic format Record drawings must be
submitted within four months of final acceptance of public utilities All digital information
submitted to the City shall be in the Carver County Coordinate system
22 Developer s Default In the event of default by the Developer as to any of the work
to be performed by it hereunder the City may at its option perform the work and the Developer
shall promptly reimburse the City for any expense incurred by the City provided the Developer is
first given notice of the work in default not less than four 4 days in advance This Contract is a
license for the City to act and it shall not be necessary for the City to seek a Court order for
permission to enter the land When the City does any such work the City may in addition to its
other remedies assess the cost in whole or in part
GC 6
245
23 Miscellaneous
A Construction Trailers Placement of on site construction trailers and temporary
job site offices shall be approved by the City Engineer as a part of the pre construction meeting for
installation of public improvements Trailers shall be removed from the subject property within
thirty 30 days following the acceptance of the public improvements unless otherwise approved by
the City Engineer
B Postal Service The Developer shall provide for the maintenance of postal
service in accordance with the local Postmaster s request
C Third Parties Third parties shall have no recourse against the City under this
Contract The City is not a guarantor of the Developer s obligations under this Contract The City
shall have no responsibility or liability to lot purchasers or others for the City s failure to enforce
this Contract or for allowing deviations from it
D Breach of Contract Breach of the terms of this Contract by the Developer
shall be grounds for denial of building permits including lots sold to third parties The City may
also issue a stop work order halting all plat development until the breach has been cured and the
City has received satisfactory assurance that the breach will not reoccur
E Severability If any portion section subsection sentence clause paragraph or
phrase of this Contract is for any reason held invalid such decision shall not affect the validity of
the remaining portion of this Contract
F Building Permits Building permits will not be issued in the plat until sanitary
sewer watermain and storm sewer have been installed tested and accepted by the City and the
streets needed for access have been paved with a bituminous surface and the site graded and
revegetated in accordance with Plan B of the development plans
G Waivers Amendments The action or inaction of the City shall not constitute a
waiver or amendment to the provisions of this Contract To be binding amendments or waivers
shall be in writing signed by the parties and approved by written resolution of the City Council
The City s failure to promptly take legal action to enforce this Contract shall not be a waiver or
release
H Release This Contract shall run with the land and may be recorded against the
title to the property After the Developer has completed the work required of it under this Contract
at the Developer s request the City Manager will issue a Certificate of Compliance Prior to the
issuance of such a certificate individual lot owners may make as written request for a certificate
applicable to an individual lot allowing a minimum of ten 10 days for processing
I Insurance Developer shall take out and maintain until six 6 months after the
City has accepted the public improvements public liability and property damage insurance covering
GC 7
246
personal injury including death and claims for property damage which may arise out of
Developer s work or the work of its subcontractors or by one directly or indirectly employed by any
of them Limits for bodily injury and death shall be not less than 500 000 for one person and
1 000 000 for each occurrence limits for property damage shall be not less than 500 000 for each
occurrence or a combination single limit policy of 1 000 000 or more The City shall be named as
an additional insured on the policy and the Developer shall file with the City a certificate
evidencing coverage prior to the City signing the plat The certificate shall provide that the City
must be given ten 10 days advance written notice of the cancellation of the insurance The
certificate may not contain any disclaimer for failure to give the required notice
J Remedies Each right power or remedy herein conferred upon the City is
cumulative and in addition to every other right power or remedy expressed or implied now or
hereafter arising available to City at law or in equity or under any other agreement and each and
every right power and remedy herein set forth or otherwise so existing may be exercised from time
to time as often and in such order as may be deemed expedient by the City and shall not be a waiver
of the right to exercise at any time thereafter any other right power or remedy
K Assignability The Developer may not assign this Contract without the written
permission of the City Council The Developer s obligation hereunder shall continue in full force
and effect even if the Developer sells one or more lots the entire plat or any part of it
L Construction Hours Construction hours for required improvements under this
contract shall be from 7 00 a m to 6 00 p m on weekdays from 9 00 a m to 5 00 p m on
Saturdays with no such activity allowed on Sundays or any recognized legal holidays Under
emergency conditions this limitation may be waived by the consent of the City Engineer Any
approved work performed after dark shall be adequately illuminated If construction occurs outside
of the permitted construction hours the Developer shall pay the following administrative penalties
First violation
Second violation
Third subsequent violations
500 00
1 000 00
All site development and construction must
cease for seven 7 calendar days
M Noise Amplification The use of outdoor loudspeakers bullhorns intercoms
and similar devices is prohibited in conjunction with the construction of homes buildings and the
improvements required under this contract The administrative penalty for violation of construction
hours shall also apply to violation of the provisions in this paragraph
N Access All access to the plat prior to the City accepting the roadway
improvements shall be the responsibility of the Developer regardless if the City has issued building
permits or occupancy permits for lots within the plat
O Street Maintenance The Developer shall be responsible for all street
maintenance until streets within the plat are accepted by the City Warning signs shall be placed by
GC 8
247
the Developer when hazards develop in streets to prevent the public from traveling on same and
directing attention to detours If streets become impassable the City may order that such streets
shall be barricaded and closed The Developer shall maintain a smooth roadway surface and
provide proper surface drainage The Developer may request in writing that the City plow snow
on the streets prior to final acceptance of the streets The City shall have complete discretion to
approve or reject the request The City shall not be responsible for reshaping or damage to the
street base or utilities because of snow plowing operations The provision of City snow plowing
service does not constitute final acceptance of the streets by the City
P Storm Sewer Maintenance The Developer shall be responsible for cleaning and
maintenance of the storm sewer system including ponds pipes catch basins culverts and swales
within the plat and the adjacent off site storm sewer system that receives storm water from the plat
The Developer shall follow all instructions it receives from the City concerning the cleaning and
maintenance of the storm sewer system The Developer s obligations under this paragraph shall end
two 2 years after the public street and storm drainage improvements in the plat have been
accepted by the City Twenty percent 20 of the storm sewer costs shown under section 6 of the
special provisions of this contract will be held by the City for the duration of the 2 year
maintenance period
Q Soil Treatment Systems If soil treatment systems are required the Developer
shall clearly identify in the field and protect from alteration unless suitable alternative sites are first
provided the two soil treatment sites identified during the platting process for each lot This shall
be done prior to the issuance of a Grading Permit Any violation disturbance of these sites shall
render them as unacceptable and replacement sites will need to be located for each violated site in
order to obtain a building permit
R Variances By approving the plat the Developer represents that all lots in the
plat are buildable without the need for variances from the City s ordinances
S Compliance with Laws Ordinances and Regulations ill the development of the
plat the Developer shall comply with all laws ordinances and regulations of the following
authorities
1 City of Chanhassen
2 State of Minnesota its agencies departments and commissions
3 United States Army Corps of Engineers
4 Watershed District s
5 Metropolitan Government its agencies departments and commissions
T Proof of Title Upon request the Developer shall furnish the City with evidence
satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to
enter into this Development Contract
GC 9
248
U Soil Conditions The Developer acknowledges that the City makes no
representations or warranties as to the condition of the soils on the property or its fitness for
construction of the improvements or any other purpose for which the Developer may make use of
such property The Developer further agrees that it will indemnify defend and hold harmless the
City its governing body members officers and employees from any claims or actions arising out of
the presence if any of hazardous wastes or pollutants on the property unless hazardous wastes or
pollutants were caused to be there by the City
V Soil Correction The Developer shall be responsible for soil correction work on
the property The City makes no representation to the Developer concerning the nature of
suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist On lots
which have no fill material a soils report from a qualified soils engineer is not required unless the
City s building inspection department determines from observation that there may be a soils
problem On lots with fill material that have been mass graded as part of a multi lot grading
project a satisfactory soils report from a qualified soils engineer shall be provided before the City
issues a building permit for the lot On lots with fill material that have been custom graded a
satisfactory soils report from a qualified soils engineer shall be provided before the City inspects the
foundation for a building on the lot
W Haul Routes The Developer the Developer s contractors or subcontractors
must submit proposed haul routes for the import or export of soil construction material
construction equipment or construction debris or any other purpose All haul routes must be
approved by the City Engineer
X Development Signs The Developer shall post a six foot by eight foot
development sign in accordance with City Detail Plate No 5313 at each entrance to the project
The sign shall be in place before construction of the required improvements commences and
shall be removed when the required improvements are completed except for the final lift of
asphalt on streets The signs shall contain the following information project name name of
developer developer s telephone number and designated contact person allowed construction
hours
Y Construction Plans Upon final plat approval the developer shall provide the
City with two complete sets of full size construction plans and four sets of ll xI7 reduced
construction plan sets and three sets of specifications Within four months after the completion of
the utility improvements and base course pavement and before the security is released the
Developer shall supply the City with the following 1 a complete set of reproducible Mylar
as built plans 2 two complete full size sets of blue line paper as built plans 3 two complete sets
of utility tie sheets 4 location of buried fabric used for soil stabilization 5 location stationing
and swing ties of all utility stubs including draintile cleanouts 6 bench mark network 7 digital
file of as built plans in both dxf tif format the dxf file must be tied to the current county
coordinate system 8 digital file of utility tie sheets in either doc or tif format and 9 a
breakdown of lineal footage of all utilities installed including the per lineal foot bid price The
Developer is required to submit the final plat in electronic format
GC lO
249
Z As Built Lot Surveys An as built lot survey will be required on all lots prior to
the Certificate of Occupancy being issued The as built lot survey must be prepared signed and
dated by a Registered Land Surveyor Sod and the bituminous driveways must be installed before
the as built survey is completed If the weather conditions at the time of the as built are not
conducive to paving the driveway and or installing sod a temporary Certificate of Occupancy may
be issued and the as built escrow withheld until all work is complete
Rev 3 31 06
GC ll
250
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952 227 1310
Senior Center
Phone 952227 1125
Fax 952 227 1110
Web Site
WIIW ci chanhassen mn us
1 ct
MEMORANDUM
TO Todd Gerhardt City Manager
Paul Oehme Director of Public Works City Engineer 0
O
FROM
DATE October 22 2007
SUBJ Satellite Fire Station Land Purchase Project No 03 09 13
Approve Expenditure of Funds
REQUESTED ACTION
Approve expenditure of funds for purchase of land for future satellite fire station
from MnDOT
DISCUSSION
The City will be in need of a satellite fire station when land develops south of
Lyman Boulevard and for calls on TH 212 The fire station will be about 10 000
square feet and will house several vehicles Staff has looked for a home for the
future satellite station over the past several years and recommends the station be
constructed south of Lake Susan Drive on Lyman Boulevard In conjunction with
the TH 212 project sewer and water services were extended to this site Also a
turnlane and a curb cut were included in the TH 212 design
Currently this property is owned by MnDOT but is considered a remnant piece
because it is not needed for the future operations of TH 212 The City has
discussed with MnDOT the purchase of the 24 acre parcel over the past year
The purchase of the property is for 114 70024 or 47 792 per acre A quick
claim deed will be drafted after payment of the land is made
Funding for the purchase of the land is proposed by an inter loan fund transfer to
be paid for by future bond proceeds
RECOMMENDATIONS
Staff recommends expenditure of funds in the amount of 114 70024 for the
purchase of a 24 acre piece of land from MnDOT Staff recommends this
purchase be made contingent on the City attorney s final title review and
approval
Attachment
The City 01 Chanhassen A growin Wlitlltlj tsa iltjffie1 IY lMilflRl rrn22g 8 r lJ gMoyinding trails and beautiful parks A great place to live work and play251
ENEISO 1o
Minnesota Department of Transportation
E Transportation Building
l 395 John Ireland Boulevard
1OFTf p Saint Paul Minnesota 55155 1899
September 21 2007
Certified Mail RRR
Mr Paul Oehme
Director of Public Works
7700 Market Blvd
P O Box 147
Chanhassen Minnesota 55317
In reply refer to C S 1017 212 12 902
Parcel 65
Carver County
Re Conveyance
Dear Mr Oehme
Iam pleased to inform you that all approvals have been obtained for the conveyance of the above referenced
parcel Prior to your acquisition of this parcel our Office ofEnvironmenta1 Services advises of the previous
existence of residential structures located on this parcel as shown on the attached sheet
The value of said 240 acre tract more or less is 115 080 00 Ifthis is acceptable please submit payment of
114 700 24 115 080 00 less deed tax of 379 76 in the form ofa cashier s check certified check or money
order made payable to Commissioner of Transportation Trunk Highway Fund Upon receipt of payment
the State will issue a Quit Claim Deed using the enclosed legal description to City Of Chanhassen
Any existing or pending assessments andor penalties will be paid by the buyer
The conveyance will be subject to the rights of existing utilities if any as provided in Minnesota Statutes
S 16145 Subdivision 3
Please submit payment and any questions you may have regarding this transaction to Bonnie McCabe
Transportation Building 395 John Ireland Boulevard Mailstop 632 St Paul Minnesota 55155 or contact her
at 651366 3476
CQj I ector
tr Office of Land Management
CIT 0 C j J
sep l 20071I1Ll
Enclosures
Legal Description 1
Map 1
E Gli c 0
An equal opportunity employer
252
IW
September 12 2007
2006 0018 1017
DESCRIPTION FOR RECONVEYANCE
Parcel 65 C S 1017 212 12 902
All of Tract A described below
Tract A That part of the Northwest Quarter of the Southeast Quarter of Section 23
Township 116 North Range 23 West Carver County Minnesota
described as follows Commencing at Right of Way Boundary Corner
B1811 as shown on Minnesota Department of Transportation Right of
Way Plat No 10 19 as the same is on file and of record in the office of the
County Recorder in and for said County thence easterly on an azimuth of
90 degrees 49 minutes 26 seconds along the east and west quarter line of
said Section 23 and the boundary of said plat for 914 84 feet thence on
an azimuth of 180 degrees 49 minutes 26 seconds for 57 00 feet to the
point of beginning of Tract A to be described thence continue on an
azimuth of 180 degrees 49 minutes 26 seconds for 521 67 feet thence on
an azimuth of 38 degrees 00 minutes 59 seconds for 290 88 feet thence
deflect to the right on a tangential curve having a radius of 5909 58 feet
and a delta angle of 03 degrees 37 minutes 05 seconds for 373 18 feet
thence on an azimuth of 270 degrees 49 minutes 26 seconds for 410 65
feet more or less to the point of beginning
containing 240 acres more or less
Subject to the following restriction
No access shall be permitted to Trunk Highway No 312 from the lands herein
conveyed except that access shall be permitted along the northerly line thereof
253
Metro District CS 1017 212 12 902 Parcel 65
Property Description
Located in the SW quadrant of Lyman Blvd and TH 212 in
the City of Chanhassen
Property Reconveyance Y IN No
Recommendations
The site appears to have only been used for agricultural
purposes prior to its acquisition by MnDOT Database
listings indicate sites that have been closed at least 10 years
ago and are located approximately I mile from the parcel
Aerial Photography Review
Source www mapquest com
The parcel lies in the SE quadrant of the intersection of Lyman Blvd and Powers Blvd The Th 212 alignment is evident along
the east side of the parcel Excavation and disturbances of the soils appear to be related to the construction of the new highway
A residential subdivision is located to the north a pond and the new TH 212 corridor to the east TH 212 corridor construction to
the south and agricultural land to the west
Source www google com maps
The site appears to be agricultural land utilized for farming A large tree grove lies along the north side of the parcel No
structures exist on the parcel
Sanborn Fire Insurance Maps
No coverage
Parcel File Review
Source Appraisal dated 3 27 2001 by Patchin Messner Appraisalsfor MnDOT
Land Use residential development land with agricultural use as an interim use until utilities are available
Zoning Agricultural Preservation District guides for residential development low density
Site Observations Vacant tract of land
Database Search Listings
MPCA MDA What s In My Neighborhood Database and MPCA Storage Tank Database
What s In My Neighborhood
MPCA No listings within I mile
MDA Three 3 listing with I mile
No Name 1 0 mi NNE Old Emergencies Contaminant unknown Closed 5 4 1994
Rosemount Inc 1 0 mi NNE Old Emergencies Contaminant unknown Closed 822 1997
No Name 1 0 mi SW Old Emergencies Contaminant unknown Closed 6 51978
MPCA Storage Tank Database Two 2 sites were listed within I mile
Hazeltine National Golf Course 0 91 mi S Closed 61 01992
Molnau Property 0 86 mi NW Closed 1112 1993
Additional Sources
Hwy 212 Phase 1 ESA DPRA 2003
Site listed as Low ranking Household quantities of chemicals were expected to have been used on the site
According to historical aerial photographs a home and several outbuildings were located on the parcel between 1937 and 1991
254
lt
f
C
J
0
tI
0
r
3
l
Z
ID
0
C
r
0 0 0 oom m
Ul bo UI N
l co l
0 0
0 0
UI 0 H
I 3 GUII
fco
0 0 0 00 0
N l1l bo UI N I 0c0
U1 CJ l
ID aJ
0 H CIl
ID Vl CI
I
l1l0 llJ
OJ Z 0
U1 N UI bo ID C
N IDOl Ul Tl Z
OfTlUl 0 bo 0r
01 OJ 010 OJ IOJl1l0bo 0
UI
N 01
Ul IDOJ ID 00OJIID000N
0 0 0 0 0 0
bo oObo bobo bo H f
ID 0l1l1D IDID ID 3
c
I l1l UI I N N I
01 IDr010 1 01 z1
0
tJ1
NO
A
A cn
ocn
J
Ul
tQy1t4 y 40 ill
l N
i
C
0
Z
6 J
Ii
L
J
Ii
l
rTI
J
cn
J l
enN
JH
i
NO
J
00
0
l
W
N
en
I
255
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
WINI ci chanhassen mn us
i
MEMORANDUM
TO Todd Gerhardt City Manager D
Paul Oehme Director of Public Works City Engineer
c
FROM
DATE October 22 2007
SUBJ Well Nos 12 13 Project Nos 08 04 08 05 Approve
Consultant Contract for Future Well Improvements
REQUESTED ACTION
The City Council is recommended to approve a consultant contract with Barr
Engineering Company for improvements to Well Nos 12 and 13
DISCUSSION
Wells 12 and 13 are recommended to replace the lost well production of Wells 5
and 6 Wells 5 and 6 are in the drift aquifer and were the cause of the lost well
production that was experienced this summer These wells cannot be relied on for
municipal water production anymore The new wells would be Jordan aquifer
producing wells Staff has identified several sites which could be used for these
wells Well Alternate Sites 2 and 4 are the preferred locations as shown on the
attached drawing The water for these wells will be treated at the East Water
Treatment plant The raw watermain for the wells is proposed to be directionally
drilled to reduce the amount of disturbed areas The consultant contract includes
preliminary and final design services It also includes time for a neighborhood
meeting to gain support for the project from the local residents The consultant
would be responsible for construction administration and observation services
On September 28 2007 staff received two proposals for the well improvement
Barr SEH IncEngineering
Submitted prior to the
deadline
Proposal format
Transmittal letter submitted
with required information
Members of the consultant
team identified
Understanding of project
Fee 155 610 210 100
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play256
Paul Oehme
Well Nos 12 13 Approve Consultant Contract
October 22 2007
Page 2
Both proposals cover the basic scope of services as identified in the Request For
Proposal Barr also included extra time in their proposal to complete a
groundwater model for the school well This modeling is necessary to see if the
school well can be converted into a municipal producing well
Due to the nature and scope of the work the project will be on a tight timeline in
order to have the wells in operation prior to the beginning of 2008 peak irrigation
season
Staff anticipates the following project schedule
Neighborhood Meeting
Complete Final Design Approve Plans and
Specifications and Authorize Ad for Bid
A ward Construction Contract
Substantial Completion of Construction
November 2007
December 2007
January 2008
May 2008
The work will be contracted on a time and materials bases with a not to exceed
amount As with all City engineering contracts the consultant must submit
periodic invoices that staff will review before processing The consultant will be
required to submit timesheets verifying the hours worked on the project and
expense sheets Staff will review the invoices and expense sheets for accuracy
and conformance to the contract
RECOMMENDATION
Staff recommends the Council approve a consultant contract with Barr
Engineering Company in the amount of 155 610 for engineering services for
Well Nos 12 13 and to complete groundwater modeling for the school well
Attachments
g eng public 2008 projects 08 04 well no 12 102207 approve consultant contract doc257
Hydrogeologic Evaluation of Reduced Well
Capacities in the Lotus Lake Well Field
City of Chanhassen
Preparedfor City of
City of Chanhassen
September 2007
BARR
4700 West 77 h Street
Minneapolis MN 55435 4803
Phone 952 832 2600
Fax 952 832 2601
Iili WiMii fJt11 Ji 2JllkiW t wa
258
Hydrogeologic Evaluation of Reduced Well Capacities in the Lotus
Lake Well Field
Table of Contents
1 0 Introduction 1
1 1 Scope 1
1 2 Our Understanding of the Problem 1
1 3 Possible Causes of Loss of Well Yield 1
2 0 Hydrogeologic Evaluation of the Lotus Lake Well Field 4
21 Extent and Nature of the Unconfined Sand and Gravel Aquifer 4
2 2 Recharge Mechanisms for the Sand and Gravel Aquifer 5
2 3 Conceptual Model of Pumping and Hydraulic Head Changes 6
24 Prognosis for Future Production from the Sand and Gravel Aquifer 7
3 0 Conclusions and Recommendations 8
Ihereby certify that this report was prepared by
me or under my direct supervision and that Iam
a duly Licensed Professional Geologist under the
laws of the state of Minnesota
Signature J
Date September 26 2007
Ray W Wuolo
Reg No 19897
P Mpls23 MN IO 2310094 Well Field modeling Communications Hydro3valuation reporc9 26 07 doc
259
List of Figures
Figure 1 Location of Chanhassen Water Supply Wells
Figure 2 Schematic Cross Section Depicting Groundwater Levels Without Pumping With Low Rates
of Pumping and With Higher Rates of Pumping
Figure 3 Locations of Cross Sections A A and B B
Figure 4 Cross Section A A West to East
Figure 5 Cross Section B B South to North
Figure 6 Map of the Thickness of the Sand and Gravel Aquifer
Figure 7 Conceptualization of Sequenced of Hydraulic Head Changes in Aquifer Systems
P Mpls23 MN 023 0094 Well Field modeling Communications Hydro evaluation reporc9 26 07 doc 11
260
1 0 Introduction
1 1 Scope
Barr Engineering Company was retained by the City of Chanhassen to evaluate the possible causes
for recent reductions in well yields from City of Chanhassen Wells 2 5 and 6 These wells are
located near the eastern edge of the City in the so called Lotus Lake well field as shown on Figure 1
Four additional wells plus one back up well at the junior high school are located in the western
portion of the City in the so called Galphin Boulevard well field
1 2 Our Understanding of the Problem
It is our understanding that City Wells 2 5 and 6 began to experience significantly reduced yields
i e lower maximum pumping rates during the Summer of 2007 The City implemented temporary
restrictions for lawn watering in order to compensate for the reduced pumping capacity Those
restrictions were lifted in August 2007
City staff found that static i e non pumping water levels in Wells 2 5 and 6 had dropped
significantly below historical levels As of this writing September 2007 they have not shown any
appreciable rebound This is an unusual circumstance for any pumping well and for these wells such
a failure for water levels to rebound has never before occurred City staff verified SCADA system
data on water levels with hand instrument measurements and confirmed that the water level
measurements in the wells were reliable
City wells 5 6 and 11 are screened in an unconsolidated sand and gravel aquifer Wells 2 and 10
completed in Prairie du Chien Jordan aquifer a bedrock unit that is the primary water supply for
most suburban communities in the Twin Cities Thus the problem of reduced well yield did not
appear to be restricted to a single aquifer
1 3 Possible Causes of Loss of Well Yield
Wells can experience reduced yield i e capacity for a number of reasons Common causes for well
yield loss include the following
1 Failure of pumping equipment
2 Obstructions in the discharge line
P Mpls23 MN 10 231 0094 Well Field modeling Communications Hydro3valuation report 9 26 07 doc
261
3 Clogging of the well screen filter pack or open hole portion of a well by precipitation or
bacterial flocculation
4 Collapse of the well screen or open hole portion
5 Reductions in available drawdown cause by
a Interference effects from the pumping of nearby wells
b Regional lowering of the poteniometric surface i e aquifer pressure caused by regional
pumping or long term reductions in recharge
c Dewatering of storage from the aquifer
The first four common causes of well yield loss are related to the well itself These causes can be
remedied by repair of the pump or redevelopment of the well In extreme cases a well may need to
be replaced i e re drilled Reductions in available drawdown can be much more problematic
because that have nothing to do with reparable infrastructure
Groundwater like surface water flows downhill In order for groundwater to flow to a well there
has to be a downhill gradient from the aquifer to the well When a well is pumped the water level
in the well is lowered inducing a downhill gradient toward the well from all directions and water
flows into the well at the same rate that it is pumped from the well If the pumping rate increases the
water level in the well is lowered even further and the gradient becomes steeper steeper gradients
allow more water to flow into the well to meet the pumping demand This concept is illustrated in
Figure 2
The relationship between the lowering of the water level in the well due to pumping called
drawdown is referred to as the well s specific capacity At low and moderate levels this
relationship is generally linear as pumping rate increases drawdown increase proportionally i e
linearly However as drawdown becomes a greater percentage of the non pumping water level this
linear relationship between drawdown and pumping begins to break down The well is said to
become less efficient What this simply means is that the aquifer cannot keep up with the pumping
demand in the well because it is trying to squeeze too much water into too thin of an zone around
the well As a general rule of thumb a well is approximately 90 efficient if drawdown is about 13
of the total available drawdown As pumping rates increase beyond this level drawdown increases to
higher percentages of total available drawdown with only a marginal increase in total pumping
P Mpls23 MN IO 23 0094 Well Field modeling Communications Hydro3valuation reporc9 26 07 doc 2
262
The key issue here is the total available drawdown in a well The total available drawdown is the
length of the column of water from the bottom of the well to the non pumping static water level in
the well If the total available drawdown is large more water can be pumped before the well becomes
very inefficient If that total available drawdown is reduced for some reason well inefficiency is
reached at lower rate of pumping As this report discusses we suspect that this phenomenon is
responsible for low well yields in Wells 5 and 6
P Mpls23 MN I02310094 Well Field modeling Communications Hydro evaluation reporC9 26 07 doc 3
263
2 0 Hydrogeologic Evaluation of the lotus lake Well
Field
2 1 Extent and Nature of the Unconfined Sand and Gravel Aquifer
The unconsolidated sand and gravel aquifer is pumped from three wells in the Lotus Lake well field
Well 5 Well 6 and Well 11 As part of this study well logs that are maintained by the Minnesota
Geological Survey s County Well Index CWI for evaluated Geologic cross sections through these
wells were developed The locations of the cross sections are shown on Figure 3 Cross Section A
A shown on Figure 4 is approximately south to north through the Lotus Lake well field Cross
Section B B shown on Figure 5 is approximately east to west through the Lotus Lake well field
Well logs from CWI were used to construct a map of the thickness of the sand and gravel aquifer that
Wells 5 6 and 11 are screened in Figure 6 This thickness map suggests that the sand and gravel
aquifer trends approximately north south along the eastern margin of Chanhassen and thins
considerably to the east into Eden Prairie and to the west Throughout most of the aquifer the
thickness is less than 25 feet The sand and gravel aquifer is thicker than 100 feet in the immediate
vicinity of Wells 5 6 and 11 but as the map on Figure 6 shows the thick portion of the aquifer is
very limited in extent about 3 000 feet by 3 000 feet The aquifer also becomes less permeable
north of Wells 5 6 and 11 where sand and gravel grades into fine sand and silt
The total volume in the sand and gravel aquifer of accessible water i e water that can likely flow
under a gradient such as pumping is approximately 6 5 billion gallons This is the approximate
volume of water that is stored within the pores of the aquifer If this storage could not be replenished
by recharge one well pumping continuously at 1 000 gallons per minute gpm would exhaust this
storage in about 12 3 years
These cross sections and the thickness map indicate the following
The sand and gravel aquifer generally trends north south but is of limited areal extent
especially to the east and west
The sand and gravel aquifer is generally less than 25 feet thick over most of its aerial extent
It is greater than 100 feet in thickness only in the immediate vicinity of Wells 5 6 and 11
P Mpls23 MN 1023l 0094 Well Field modeling Communicalions Hydro evalualion reporc9 26 07 doc 4
264
The sand and gravel aquifer is overlain by a thick 100 to 200 feet continuous layer of low
permeability glacial till composed of yellow clay near the surface blue clay below the
yellow clay and sandy or gravelly clay These thick till units likely transmit very little
recharge either from infiltrating precipitation or leakage from surface water bodies
The sand and gravel aquifer is separated from the underlying Prairie du Chien Group
dolomite by a basal sandy and gravelly clay till that is typically 25 to 100 feet thick In some
locations the basal portion of the St Peter Sandstone overlies the Prairie du Chien Group
The basal portion of the St Peter Sandstone is a low permeability shale
In one area immediately south of Wells 5 and 6 well logs indicate that the basal till layer is
absent In this area the sand and gravel aquifer is in direct hydraulic connection with the
underlying Prairie du Chien Group This window in the basal till layer is one location
where there would tend to be higher rates of flow between the underlying Prairie du Chien
Group and the sand and gravel aquifer
2 2 Recharge Mechanisms for the Sand and Gravel Aquifer
Given the limited aerial extent of the sand and gravel aquifer and the overlying thick sequence of
low permeability glacial till it appears likely that the primary mechanism for recharging the sand
and gravel aquifer is by upward flow from the Prairie du Chien Group into the sand and gravel
aquifer Recharge would likely be through the windows in the basal till but would also take place
at much lower rates through the basal till itself
Recharge of the sand and gravel aquifer by the Prairie du Chien Group would take place when the
hydraulic head in the Prairie du Chien Group is higher than the head in the sand and gravel aquifer
Prior to modern development of this portion of the Twin Cities metropolitan area pressure heads in
the Prairie du Chien Group would have been well above the top of the sand and gravel unit and the
head pressures within the two units would have reached an equilibrium
In recent years it appears likely that regional pumping of the Prairie du Chien Jordan aquifer system
has resulted in a lowering of pressure heads in the Prairie du Chien Group at least for a portion of
most years In response to this lowering of pressure head in the Prairie du Chien Group there has
likely been a disequilibrium between heads in the Prairie du Chien Group and the sand and gravel
aquifer with higher heads in the sand and gravel aquifer This likely resulted in a condition in which
the sand and gravel aquifer actually was recharging a portion of the Prairie du Chien Group via
leakage through the basal till windows and to a lesser extent through the basal till itself In other
P Mpls23 MN IO231 0094 Well Field rnodeling Cornrnunications Hydro evaluation reporC9 26 07 doc 5
265
words pumping in the Prairie du Chien Group not only stops the recharge of the sand and gravel
aquifer it induces downward leakage from the sand and gravel aquifer
2 3 Conceptual Model of Pumping and Hydraulic Head Changes
A conceptual model of how hydraulic head has changed in the sand and gravel aquifer in responds to
pumping is shown sequentially in Figure 7 The aquifer geometry as shown on Figure 7 has been
simplified for clarity
In illustration 1 of Figure 7 the hydraulic heads in the Prairie du Chien Group and the sand and
gravel aquifer are shown in a condition that likely was present before widespread pumping in
southeastern Caver and southwestern Hennepin Counties began early 1960 s The hydraulic head of
the two aquifer systems were likely nearly equal to one another and the sand and gravel aquifer was
fully saturated There likely was little leakage between the two aquifer systems because there was no
hydraulic gradient
In illustration 2 of Figure 7 the hydraulic head of the Prairie du Chien Group is lowered in response
to pumping of Chanhassen Well 2 and other pumping in the region The lowering of hydraulic head
in the Prairie du Chien Group causes downward leakage from the sand and gravel aquifer with the
largest rate of leakage likely taking place through the windows in the basal till In response to this
leakage the hydraulic head in the sand and gravel begins to drop When the hydraulic head reaches
the top of the sand and gravel aquifer water that is stored in the pore spaces of the aquifer begins to
drain causing dewatering of the top of the aquifer Replenishment via recharge from the overlying
till is likely minimal
In illustration 3 of Figure 7 Wells 5 6 and 11 are installed and are pumping in the sand and gravel
aquifer Well 2 continues to pump Pumping of Wells 5 6 and 11 further deplete storage in the sand
and gravel aquifer and the hydraulic head drops further Regional pumping in the Prairie du Chien
Group combined with pumping of Well 2 further lowers the hydraulic head in the Prairie du Chien
Group and prevents the Prairie du Chien Group from recharging from below the sand and gravel
aquifer
Illustration 4 of Figure 7 represents the current situation The hydraulic head in the Prairie du Chien
group has dropped to near the level of the pump intake in Well 2 resulting in a substantial drop in
specific capacity of this well The sand and gravel aquifer has been dewatered to a level where the
hydraulic head for this aquifer is slightly above the pump intakes for Wells 5 and 6 these wells
also have substantially reduced capacity because there is very little available drawdown left Well 11
P Mpls23 MN IO 2310094 Well Field modeling Communications Hydro3valuation reporc9 26 07 doc 6
266
which is about 500 feet from the other wells and is screened slightly deeper in the sand and gravel
aquifer continues to have sufficient available drawdown to continue to operate However much of
the sand and gravel aquifer has had its storage depleted
2 4 Prognosis for Future Production from the Sand and Gravel
Aquifer
It is likely that the combined effects of pumping out of the sand and gravel aquifer Wells 5 6 and
11 and downward leakage induced by the pumping of Well 2 and regional pumping in the Prairie du
Chien Group has substantially dewatered the sand and gravel aquifer According to DNR water
appropriations records Chanhassen has pumped about 4 billion gallons of water from the sand and
gravel aquifer That volume of water is about 60 percent of the available storage based on the
volume of the aquifer as previously discussed
In September 2007 the City staff measured the static non pumping water levels in the Lotus Lake
well field wells and also measured changes in water levels when Well 11 was turned on and off It
was found that the static water levels in all of the wells were at about the same elevation It was also
found that water levels responded to cessation of pumping but not at the level one might normally
expect i e only a couple feet at most This lack of response is likely the result of unconfined
conditions within the sand and gravel aquifer Sand and gravel aquifers are slow to respond to
changes in pumping because of the high values of storage
Over the winter water levels in the Prairie du Chien Group may rise and begin to recharge the sand
and gravel aquifer from below It is unlikely that the upward vertical flow into the sand and gravel
aquifer will be sufficient to replenish much of the depleted storage In the Spring when demand
increases Wells 5 and 6 may be operational but only for a very short time There is likely insufficient
time during the winter to realize much in the way of replenished storage In fact it would likely take
many years of no pumping in the sand and gravel aquifer combined with high water levels in the
Prairie du Chien Group to result in substantially resaturation of the sand and gravel aquifer
Well 11 may continue to produce water However it is reasonable to assume that eventually Well 11
could experience decreased specific capacity Wells 5 and 6 should not be counted on for future
production
P Mpls23 MN 10 231 0094 Well Field modeling Communications Hydro evaluation report 9 26 07 doc 7
267
3 0 Conclusions and Recommendations
Based on this hydrogeologic evaluation the following are concluded
1 The sand and gravel aquifer of the Lotus Lake well field is of limited aerial extent Much of
the aquifer is less than 25 feet in thickness Assuming a specific yield of 0 2 the total volume
of water stored in the aquifer is about 6 5 billion gallons
2 The entirety of the sand and gravel aquifer is overlain by a thick sequence of low
permeability glacial till that greatly inhibits recharge from infiltrating precipitation and
leakage from surface water bodies Recharge while likely not zero is something very close
to zero through the overlying till
3 A gravelly clay till underlies the sand and gravel aquifer in most locations and separates the
sand and gravel aquifer from the underlying Prairie du Chien Group The Prairie du Chien
Group combined with the Jordan Sandstone is the primary aquifer system for water supply
in the Twin Cities exclusive of surface water sources There is at least one window in the
this basal till unit that allows for a direct hydraulic connection between the sand and gravel
aquifer and the Prairie du Chien Group Upward flow from the Prairie du Chien Group into
the sand and gravel aquifer through these windows as well as diffuse leakage through the
basal till is the primary mechanism for recharging the sand and gravel aquifer
4 Pumping from Prairie du Chien Jordan Well 2 combined with regional pumping in the
Prairie du Chien Jordan aquifer likely has resulted in lower hydraulic heads in the Prairie du
Chien Group underneath the Lotus Lake well field These lower heads have effectively
reduced or stopped upward recharge of the sand and gravel aquifer
5 Pumping of the sand and gravel aquifer by Wells 5 6 and 11 has caused much of the sand
and gravel aquifer to become dewatered as storage has been removed It is estimated that
over 60 percent of the available storage of the sand and gravel aquifer has been pumped by
these wells
6 As storage has been depleted hydraulic head levels in the sand and gravel aquifer have
dropped causing reductions in available drawdown within the wells During the summer of
2007 the available drawdown was reduced to a critical level causing the specific capacity
and well efficiency of Wells 5 and 6 to rapidly drop The result has been a nearly complete
P Mpls23 MN 10231 0094 Well Field modeling Communications Hydro evaluation reporc9 26 07 doc 8
268
loss in well capacity Well 11 continues to produce water primarily because it is screened
slightly deeper than the other wells and has a lower pump setting Well 11 may continue to
produce water but it may also begin to experience reduced yields similar to Wells 5 and 6
7 It is unlikely that the Prairie du Chien Group will be able to recharge the sand and gravel
aquifer and replenish the stored water that has been pumped This is especially the case as
long as there is continued pumping in the sand and gravel aquifer by Well 11
8 Regionally the hydraulic head in the Prairie du Chien Jordan aquifer has dropped over the
summer The result has been a lowering of available drawdown in Well 2 The pump intake
of Well 2 is actually above the top of the Prairie du Chien Group
Based on this evaluation the following are recommended
1 Lower the pump setting in Well 2 The pump intake in Well 2 is in the casing above the
open hole portion of the Prairie du Chien Group This well s capacity should be able to be
restored to it s original value by lowering the pump and thereby increasing the available
drawdown Consideration should be given to lowering the pump into the Jordan Sandstone
2 Install two wells completed in the Prairie du Chien Jordan aquifer to compensate for the loss
of use of Wells 5 and 6 These two new wells do not constitute a new appropriation they are
designed to replace lost capacity The Prairie du Chien Jordan aquifer while heavily used in
the region is generally very reliable Test wells should not be necessary The following
additional items should be considered in the installation of these wells
a It is imperative that wells are separated from one another by a distance sufficient to
minimize well interference effects As a general rule of thumb wells should be 1 000
feet from one another unless they are completed in different aquifers that have little
or no hydraulic connection Distances farther than 1 000 feet are better Distances
closer than 1 000 feet will likely result in some overall capacity because of well
interference therefore there will be some trade off when considering available land
for installing wells
b Larger diameter wells afford the opportunity to install larger more efficient pumps
Larger diameter wells are generally more efficient in terms of aquifer losses
resulting in more capacity
P Mpls23 MN I 0 2310094 Well Field modeling Communications Hydro evaluation reporc9 26 07 doc 9
269
c Screens can be used in bedrock aquifers Screened wells cost more than open hole
wells and there is some reduction in specific capacity for screened wells Screened
wells may have lower development costs
d The Minnesota Department of Health has requirements for isolation distances for
wells Department of Health staff should be consulted before finalizing locations
e The Minnesota Department of Natural Resources is responsible for water
appropriations and should be consulted before finalizing well locations Department
of Health staff should also be consulted with regard to any additional evaluations that
may be required because of the City s proximity to Seminary Fen a calcareous fen
wetland complex north of the Minnesota River in the southeastern portion of Chaska
3 Consideration should be given to reevaluating the City s water conservation program to
minimize peak summer demand The Minnesota Department of Natural Resources and the
Metropolitan Council offer assistance to cities in designing and implementing water
use conservation programs For example some methods of implementation of lawn
sprinkling restrictions have been found to be more effective than others
It is unlikely that the current problems with the wells in the Lotus Lake well field could have
been discovered and mitigated before they occurred Aquifer tests e g pumping tests typically
are not run long enough nor do they pump at sufficiently high rates to disclose potential aquifer
dewatering Unfortunately these types of problems in unconsolidated sand and gravel aquifers
often do not manifest themselves until several years of pumping have taken place It is unusual in
the Twin Cities metropolitan area to find wells that suddenly lose capacity such as Wells 5 and
6 The circumstances for the loss of capacity are the result of an aquifer of limited aerial extent a
thick covering of low permeability clayey till and better than anticipated connection with the
underlying Prairie du Chien Jordan aquifer
P Mpls23 MN IO 2310094 Well Field modeling Communications Hydro3valuation report 9 26 07 doc 10
270
2000
I
o 2000 4000 Feet
Figure 1
Location of Chanhassen Water Supply Wells
271
PUlnped vater
original vater surface
Vater smiace when pumping
At low rate
Vater smface when pumping
At hi her mte
AQUIFER
Figure 2
Schematic Cross Section Depicting Groundwater Levels Without Pumping With
Low Rates of Pumping and With Higher Rates of Pumping
272
A
159021
o
265613
7329
t514 871
426526 I
2000
I
o 2000 4000
Figure 3
Locations of Cross Sections A A and 8 8
273
1
I i
tl V 6
i
ti
D DDDD
o
f
V
o
I
V
i CB8SQl
OLSgoz
S6CO
OM
19SO
9 ZZ
I
M
f
S019tr
w
z
8
i
5l
cl
c
2
o
1l
U
f
f
oU
en
W
o
en
Q
ot
Q
J
g
U c
o
CJ
Q
J
I
en
en
o
J
274
CD 5z g
1
i
i
15
5o
o
if
f
v
oi
t
l
t
969 ll
OvSSOS
i
CD 9tSSSt
275
Thickness of Sand and Gravel Unit
feet
cJ 0 10
l l 10 25
D 25 50
CJ 50 100
III 100 200
D No Data
2000
I
o 2000 4000 Feet
Figure 6
Map of the Thickness of the Sand and Gravel Aquifer
276
o
J
o
t
C
c
Q
N
Q
o
J
o
en
t
0
c
t
J
o
t
c
o
IT1
c Q
l c
Q l
c t
o
I
t
Q
c
r
Q
J
Q
t
f
J
0
c
t
l
en
f
t
3
f
000000
Ii t Jt
I I l j l
I I f
I
j
000000
Ii t l iIiIll
I I f
I
ti
1
i
I
t
f
i
DmJDDD
Ii t IrifIIf
J
000000
I j It Ii
I i l j l
I I f
I
277
278
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
WIfW ci chanhassen mn us
1
MEMORANDUM
TO Todd Hoffman Park Recreation Director
FROM Susan Bill Senior Center Coordinator
6
DATE October 10 2007
SUBJ Accept 600 Donation from Community Bank Chanhassen
Annually the Senior Center hosts a Holiday Party for its participants The party
consists of a catered lunch entertainment and door prizes The participants
traditionally have funded this event with the average cost being approximately
15 per person As is the practice in other cities senior centers often look to
partner with a local business for sponsorship or co sponsorship of an event of
this nature I spoke with Bill Traxler President of Community Bank
Chanhassen who has graciously agreed to fund the catered lunch for this event
RECOMMENDATION
It is recommended that the City Council accept the 600 donation from
Community Bank Chanhassen to assist with costs for the annual Holiday Party
Approval of this donation requires a simple majority vote of those City Council
members present Upon approval from the Council staff will send a letter
thanking them for their donation and presenting them with a Certificate of
Appreciation
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play279
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952227 1170
Finance
Phone 952227 1140
Fax 952227 1110
Park Recreation
Phone 952227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952227 1404
Planning
Natural Resources
Phone 952227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952227 1310
Senior Center
Phone 952227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
tj
MEMORANDUM
TO Mayor
City Council
FROM Greg Sticha Finance Director
of1fDATEOctober222007
SUBJECT Certification of Delinquent Water and Sewer Accounts
Chanhassen city ordinances provide two methods for collection of delinquent water
and sewer accounts The ordinance states In the event any water service is not paid
within three 3 months after the time it is rendered the city council may recover said
amount in an action brought in any court of competent jurisdiction or in the
alternative may certify the amount due together with penalties to the county auditor
to be collected with other real estate taxes levied against the premises served
The procedure for collecting the water and sewer bills is that a bill is generated once a
quarter for each account If not paid we then send a letter in the fall August through
October depending on which district the account is in notifying the property owner
of the delinquency and the consequences of non payment They are allowed to have a
public hearing to dispute the certification The list is then sent to the county by
December 1 The list of delinquent properties is available in the Finance Department
There were no accounts who notified us wishing to dispute these delinquent charges
as of October 12 2007
Current practice is to certify the amount due to the property taxes The city does not
go to court on these small amounts There are 236 accounts with a total value of
137 109 36 to be collected this year This compares to 200 accounts with a total
dollar amount of 88 994 96 last year We believe that at least several accounts will
be paid in full by the time that the final list is established in December The other
accounts will be certified to the county for collection with a fee of 20 20
minimum added for the administrative costs incurred Approval of this item requires
a simple majority vote of those city council members present
ATTACHMENT
1 List of properties and delinquent amounts
2 Resolution approving certification of delinquent accounts
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play280
Parcel
District 1
25 7950110
25 8100070
25 0253300
25 0251500
25 77601 00
25 7770110
25 5540320
25 5550220
25 1860330
25 1860180
25 1860140
25 1870370
25 5300290
25 5300380
25 1820420
25 3450960
25 3450660
25 3450490
25 3450210
25 7900080
25 3500271
25 3500280
25 3500180
25 3500080
25 0500130
25 0500190
25 0800270
25 8210120
25 4440050
25 8010040
25 3900160
25 3900070
25 881 0320
25 8230020
25 7600040
25 7600041
25 1980300
25 2080070
25 2090070
25 2090010
25 8570130
25 1990180
25 2040090
25 1250020
25 8110140
25 811 0220
25 8130030
25 8140180
Amount
567 22
184 19
197 54
53947
1041 05
107 63
248 80
982 16
420 73
402 94
299 82
763 07
404 10
66 81
865 88
274 70
661 16
819 16
191 92
956 24
974 36
489 66
622 15
259 93
247 14
303 10
238 39
521 02
793 20
413 15
40945
581 15
253 09
941 90
370 61
462 50
223 21
184 84
138 61
240 35
1644 84
590 84
605 14
12544
2173 62
601 93
131 68
386 63
Page 1 of 5
281
Parcel Amount
25 8540140 209 57
25 8540200 207241
25 8290250 455 74
25 4530260 1941 62
25 8970030 914 62
25 2560190 163 28
25 2560440 501 10
25 8070230 129 66
25 7410030 199 31
25 3900210 172 88
25 7400021 188 52
25 3500130 606 01
District 2
25 2300070 3046 56
25 4200250 719 12
25 4200110 171 98
25 4200100 496 38
25 2730090 224 62
25 2730610 494 63
25 2730570 249 16
25 2730300 54 67
25 2730470 801 62
25 3810010 61 29
25 3810020 61 29
25 3810030 61 29
25 0011400 98 99
25 7300030 319 88
25 6980020 717 37
25 2150010 347 50
25 1090060 48 01
25 2550050 20647
25 1602230 2931 88
25 2700240 20348
25 1602260 1459 03
25 1620170 105649
25 3630020 80 18
25 1600870 416 77
25 1600860 262 99
25 8730020 535 72
25 8530020 339 56
25 1600280 1589 50
25 0125600 755 90
25 2000270 501 07
25 1601260 235 39
25 1601260 1503 79
25 1601610 934 84
25 1601490 654 90
25 1601500 35449
Page 2 of 5
282
Parcel
25 1601550
25 3000200
25 3000760
25 2000160
25 2021270
25 2021310
25 2021360
25 2021370
25 2021160
25 2020730
25 2020750
25 2020950
25 2020990
25 2021050
25 2030640
25 2031000
25 2030390
25 2030370
25 2020360
25 2020300
25 2020170
25 2020150
25 2020160
25 2031140
25 8590080
25 2540020
25 6710090
25 6710060
25 8500020
25 3100080
25 1940020
25 5630200
25 5610250
25 5610360
25 7550420
25 7550200
25 7550190
25 7551290
25 2620190
25 8840040
25 6840010
25 2730550
25 5570100
25 1600430
25 561 0350
25 2030180
25 1602240
25 1520050
25 1520010
Amount
252 22
98 54
809 78
58045
471 23
521 90
924 53
1067 98
275 74
305 70
630 82
201 01
262 99
1978 72
140 92
507 62
44 15
88 25
204 29
357 86
425 63
71 28
410 21
238 27
67447
1776 17
25640
22645
573 08
610 60
757 63
247 63
186 26
453 74
611 57
45 37
370 16
713 58
405 38
597 17
61 28
319 55
59344
179 75
319 55
99 00
136 68
48 01
601 32
Page 3 of 5
283
Parcel Amount
25 2910060 438 16
25 2910010 1810 22
25 1530030 38 05
25 2910050 512 35
25 1600520 25049
25 2620530 2923 18
District 3
25 3800030 171 02
25 0600040 63 67
25 5050300 235 38
25 2470010 682 00
25 5350010 267 84
25 5450010 388 92
25 5460050 404 72
25 5490020 773 16
25 8450020 170 28
25 11 00080 236 81
25 5150020 198 66
25 2950030 110 08
25 6660060 612 58
25 5750090 39 93
25 5750100 39 93
25 4950470 1594 67
25 4950660 117 84
25 1400090 987 01
25 3420110 381 07
25 3420210 6346
25 3420230 6346
25 3420220 6346
25 3420240 6346
25 4810230 127540
25 4810150 459 12
25 4820040 463 66
25 6150380 230 17
25 6500150 48046
25 4060060 259 13
25 00831 00 5601 89
25 8600090 88 18
25 3510240 84244
25 4060840 145 07
25 4060180 535 63
25 4060300 1342 88
25 3970330 1248 97
25 3980340 98 17
25 4020260 949 33
25 3960090 781 91
25 6380160 498 35
25 6390120 118 60
Page 4 of 5
284
Parcel
25 6390160
25 7530020
25 8480860
25 8481330
25 8481650
25 8481730
25 8481750
25 8481880
25 8482340
25 0610340
25 0690020
25 8660310
25 2580010
25 3490370
25 3490380
25 3420130
25 0050700
25 0050200
25 0363000
25 6100190
25 6100010
25 1200010
25 0242100
25 3530070
25 4080200
25 0361100
25 3370040
25 0610410
25 4950600
25 6730010
25 3420100
25 0880790
25 6380150
25 0101800
25 0101810
25 0640370
25 4030250
25 5050170
25 0880500
25 7560430
25 7560460
25 8481600
25 8482120
25 3420170
25 0710210
Total
Amount
773 14
374 11
58 23
60 12
234 06
69 24
154 56
63146
197 84
170 84
15394 87
680 18
406 38
93049
233 51
152 12
100 52
41 88
810 98
35 80
48 01
38 02
71 06
63 67
48 01
824 64
39 02
24342
66 34
345 60
188 69
625 58
145 07
67 11
38 02
27643
1928 30
267 95
123 31
37 91
5045
192948
32844
1216 28
488 71
137 109 36
Total of 236 accounts outstanding
Revised 10 12 07
Page 5 of 5
285
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
DATE October 22 2007 RESOLUTION NO 2007
MOTION BY SECONDED BY
A RESOLUTION CERTIFYING DELINQUENT UTILITY ACCOUNTS TO
THE COUNTY AUDITOR
WHEREAS State Statute 444 authorized cities to specially assess delinquent sewer
and water charges against the benefiting property being delinquent for said charges and
WHEREAS the City Council has determined that the attached Exhibit A represents
utility customers who have been delinquent in paying their current sewer and water billings
for more than one quarter
NOW THEREFORE BE IT RESOLVED that the City Council ofthe City of
Chanhassen hereby authorizes the City Manager to certify the attached Exhibit A to the
appropriate County Auditor for collection with property tax certifications being certified in
2007 collectible in 2008
Passed and adopted by the Chanhassen City Council this 22nd day of October 2007
ATTEST
Todd Gerhardt City Manager Thomas A Furlong Mayor
YES NO ABSENT
286
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
1J
MEMORANDUM
TO Mayor and City Council
FROM CcGregStichaFinanceDirector
DA TE October 22 2007
SUBJ Resolution Certifying Hook up Charges for Dell Road
Medical Building
BACKGROUND
When a residential or commercial user hooks up to the city s sewer and water
system they have the choice to either pay the hook up fees at the time the
building permit is issued or have the fees certified to their property taxes
The Dell Road Medical Building has chosen to have the fees certified to their
taxes This property is located in Hennepin County and they require a City
Council resolution certifying these fees Carver County does not
RECOMMENDATION
Staff recommends adoption of the attached resolution certifying the hook up
fees to the property taxes of the Dell Road Medical Building for taxes payable in
2008 Approval of this item requires a simple majority vote of those City
Council members present
ATTACHMENT
1 Resolution
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play287
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
DATE October 22 2007 RESOLUTION NO 2007
MOTION BY SECONDED BY
RESOLUTION AUTHORIZING CERTIFICATION
OF HOOK UP CHARGES TO PROPERTY TAXES
DELL ROAD MEDICAL BUILDING
WHEREAS the property located at 7770 Dell Road Lot 3 Block 1 Park One 4th
Addition PID 07 116 22 34 0021 has requested that the hook up charges for water and sewer
services in the amount of 44 226 80 be certified to their property taxes for payable in 2008
NOW THEREFORE BE IT RESOLVED that the City Council of the City of
Chanhassen Minnesota authorizes the certification of said water and sewer hook up fees to be
certified to the property noted above in the amount of 44 226 80
Passed and adopted by the Chanhassen City Council this 22nd day of October 2007
ATTEST
Todd Gerhardt City Manager Thomas A Furlong Mayor
YES NO ABSENT
288
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
i
MEMORANDUM
TO Paul Oehme City EngineerDir of Public W orkS 0 c
FROM Krista Torgerson Natural Resources Technician r
October 10 2007 ODATE
SUBJECT Lake Riley Woods Raingardens SWMP12 035A Authorize
Expenditure of Funds for Installation of the Lake Riley Woods
Raingardens
BACKGROUND
On June 23 2007 the Carver Soil Water Conservation District Board of
Supervisors approved the State cost share application for the City of Chanhassen
as part of the Metro Environment Partnership grant for the Foxford Road
Stormwater Retrofit Project The amount approved for these raingarden project is
12 000
DISCUSSION
The City is experiencing problems with drainage in the Lake Riley Woods
development which largely drains to the drainage channel on the Deal property
In the past erosion that has occurred along this drainage channel is currently being
addressed with a rip stabilization project SWMP12 035B The Lake Riley
Woods raingardens would reduce the volume of stormwater that passes through
this channel and therefore reduce the potential for future erosion of the channel
The development is large lot with no City services The streets are rural section
and storm water is not treated in ponds before discharging into wetlands and
eventually into Lake Riley The Lake Riley Woods raingardens would also
provide some treatment for stormwater by reducing sediment and nutrient loading
in Lake Riley Lake Riley is currently listed as impaired water for excess
nutrients
Plans and specifications for the Lake Riley Woods raingardens have been
completed by the Association of Metropolitan Soil Water Conservation
Districts These plans include over excavation of current clay and compacted
soils to a depth of 30 The soil would then be replaced with a 75 sand 25
compost mixture in order to increase infiltration and volume storage A
depression of 6 9 would remain for holding capacity during rain events A total
of nine raingardens are planned for construction Every rain garden would include
an overflow that would outlet to the existing culvert The raingardens would then
be covered with 6 of mulch and planted with shrubs All raingardens are to be
constructed within the City s right of way and the City of Chanhassen will
continue to maintain any drainage within the City s right of way Private utilities
will be avoided or moved The homeowners have will sign a maintenance
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play289
Paul Oehme
Lake Riley Woods Raingardens
October 22 1007
Page 2
agreement with the City of Chanhassen before installation of the raingarden
stating that they are responsible for maintenance of the plantings within the
raingarden An example of the plans and specifications is attached to this
background
Funding for this project has been budgeted III the 2007 Surface Water
Management Fund
Three quotes have been obtained from the following contractors
Kusske Construction Company Inc
Earth Wizards Inc
Sunram Construction Inc
44 865 00
33 756 00
25 000 00
Staff has checked Sunram Construction Inc references and they have experience
with raingarden construction Their past work and scheduling has been
acceptable
The City s share of the project is 13 000
The anticipated schedule of the project is as follows
Award Contract
Start Construction
Substantial Completion
October 23 2007
October 24 2007
May 2008
RECOMMENDA TION
Staff recommends that City Council approve expenditure of funds and award a
contract to Sunram Construction in the amount of 25 000 for the Lake Riley
Woods Raingardens Project SWMPI2 035A
Attachments
g engswmp files lake riley woods 02207 approve funds Irw raingardens doc
290
Lake Riley Woods Rain Gardens
ii
Rain Garden Locations
291
r
f GlAUI
7cz
p
1
cqY 11JC
If 11
SlO E Pl lM C V N
CJ
D f e
M cv1 S lw
I02 D
i I CI f
2ljjr7
d
O rJ EO
1171
I I
f
Gi f4
I
C
f L Cf r
I01
tot
fi j
t
41
lttGi CoNllTI 5
S of 1
292
i
rd
p
t
J I
10
0
11 6UlU ROC 10
ENSUIllAAJl lP rJ
Pf Tot OF lOl
QOIJ 6f 1l c0
RJ 0 uJ
cqLi 11
pJ
I Ifi
l4f t ef cA
SOIL bSQ nttJ 1 fSA T
C t Ji C
fJl
fII fJo
UW
ec ITl Et
OV
r WAn oF I
lot
11
bU CAcv 1fl J
t
41
l p
r 1 of 4
293
1
1
p
t
I I
10 10
0
cq Y 1 Ir
I rtJ
fca@ I
OF f7 MULCl
tAJJ
JOi
z I
fJ CbtstFOL
c Z
I I
D
CJ iZlc
1b nw
ec tT Et
OV
10
lot
lf
11
W etj L lAN
Sef
294
I
rr
j
r
i
r
J
J Z
j
F
s
c
C
c
rSJ
lU 1f z 1I
295
Capital Improvement Program
City of Chanhassen MN
2007 thru 2011
Project SWMP 012
Project Name SWMP Implementation
Aeeount 1 720 0000 4300
Aeeount 2
Aeeount 3
Contact Unassigned
Department Surface Water Management
Type Improvement
Useful Life Unassigned
Category SWMP
Priority nla
Total Project Cost 1 650 000
Description I
This project implements projects identified as high priority by the Citys Surface Water Management Plan the National Pollutant Discharge
Elimination System NPDES Phase II permit City Council andor City staff
Justification I
These projects are necessary to meet state and federal government requirements for storm drainage address storm water issues in existingdevelopmentsmaintainexistinginfrastructureandconstructtheinfrastructurerecommendedbytheCitysSurfaceWaterManagementPlan
Expenditures
Construction
2007
450 000
Total 450 000
2008
300 000
300 000
2009
300 000
300 000
2010
300 000
300 000
Funding Sources
Surface Water Utility Fund
Total
2007
450 000
450 000
2008
300 000
300 000
2009
300 000
300 000
2010
300 000
300 000
Operational Impact Other I
Citywide No map
2011
300 000
300 000
Total
1 650 000
1 650 000
2011
300 000
300 000
Total
1 650 000
1 650 000
103
296
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
WINI ci chanhassen mn us
1j
MEMORANDUM
TO Todd Hoffman Park Recreation Director
FROM Susan Bill Senior Center Coordinator
DATE 0October102007
SUBJ Accept 960 Donation from KleinBank Chanhassen for 2008
Senior Center Lifelong Learning Program
The Chanhassen Senior Center will again be offering a Lifelong Learning
Program in 2008 The focus of the program will be to provide a variety of
classes and learning opportunities for adults age 55 and older at the Senior
Center The Senior Center will be utilizing classes offered through Augsburg
College The College of the Third Age This program offers older adults the
opportunity to expand their minds to express themselves in creative ways to
develop new interests to prepare for and experience retirement with anticipation
and joy and to maintain good physical and mental health This six class series
will be offered at the Chanhassen Senior Center
RECOMMENDA TION
It is recommended that the City Council accept the 960 donation from
KleinBank Chanhassen to assist with costs for the 2008 Lifelong Learning
Program Approval of this donation requires a simple majority vote of those
City Council members present Upon approval from the Council staff will send
a letter thanking them for their donation and presenting them with a Certificate
of Appreciation for their contribution
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play297
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952227 1110
Building Inspections
Phone 952227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952227 1110
Park Recreation
Phone 952227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952227 1110
Web Sile
WiWci chanhassen mn us
i
NlEMORANDUM
TO Todd Gerhardt City Manager
Laurie Hokkanen Assistant City ManageFROM
DATE October 18 2007
RE Elected Official Travel Approval
BACKGROUND
In accordance with State law the City of Chanhassen has a policy in place
governing elected official travel Pursuant to this policy all out of state travel by
City elected officials must be approved by the City Council
The out of state travel requested for consideration is for attendance by
Councilmembers Craig Peterson and Bethany Tjornhom to attend the National
League of Cities Congress of Cities Exposition in New Orleans LA on
November 14 17 2006 The City Manager will also attend
Attached please find a sheet highlighting some of the program offerings at the
conference
This trip meets the following criteria established by the City s travel policy
The elected official will be meeting and networking with other elected
officials from around the country to exchange ideas on topics of relevance to
the City or on the official roles of local elected officials
The elected official will be receiving training on issues relevant to the city or
to his or her role as a council member
The city has sufficient funding available in the budget to pay the cost of the trip
including registration hotel flight and meals
RECOMMENDATION
Staff recommends approval of this request Approval of this item requires a
majority of Council approval
The City of Chanhassen A growing community with clean lakes quality schools a channing downtown thriving businesses winding trails and beautiful parks A great place to live work and play
G Admin LH Mayor Letters Out of State Travel Request NLC 2007 doc
298
Just Say YES to N D
Ii Ever wonder what it really means to rebuild a community Now s
1 your chance to find out The 2007 Congress of Cities Exposition
i offers a unique opportunity to view the rebirth of a community
11 fe r
y I
f a
t
f
i
I
nd te ion
Hear the stories visit the restoration lones and learn about the r
from people who lived through it and rose above it
Conference Workshops
j The conferenceWiH f eature a broad range of workshops organized into major tracks on
li
issues that matter in cities and towns of all sizes Aseasoned facilitatorwill moderate
workshops in eachtrack to maximize the sharing of information and tryetaking home of
ideas Here s a preliminary list of conference workshops
FINANCE
Paying for the Future lang term Financial Planning
Understanding GASB
Wanna Buy a BridgeSelling Public Assets
legislating for Results Outcome Based Governance
Citizen Based Budgeting
SUSTAINABILlTY
Green Buildings
Developing a City Sustainability Plan
Regional Water Management
Smart Growth
Green Practices Purchasing Recycling and More
PUBLIC SAFETY
Youth Violence and Gang Prevention
Methamphetamine laboratories
Challenges Facing Municipalities
Interoperability Can We Talk
Weathering the Storm The Role of Partners
in Emergency Response
Safe and Sound Building Afterschool Systems
for Children and Youth
Recruiting and Retaining law Enforcement Personnel
INFRASTRUCTURE
Public Private Partnerships for Infrastructure
New Transportation Technology
Broadband and Wifi Technology Strategies
for Connecting with Citizens
Water Infrastructure
Designs for Active living City Innovations
to Combat Childhood Obesity
COMMUNITY DEVELOPMENT AND HOUS
ING
Give Me Shelter Preserving Affordable
Rental Housing
One Size Doesn t Fit All
Affordable Housing Strategies for Your City
Restoring Community after an Emergency
Cities Helping Families Build Assets
lessons learned and Pitfalls to Avoid
Meeting the Needs of the Uninsured
Workforce Development
COMMUNITY
Involvement in Rebuilding After a Disaster
Who Will Take Care of the Children Rebuilding
Child Care Infrastructure
Bringing the Music Back Restoring
Community Culture
Partnerships for Education
Integrating Immigrants into the Community
SPECIAL TOPICS
From E Government to E Democracy
Using Online Tools for Engagement
Revitalizing Your Downtown
I
Ii
i
i
I I
I I
i IIII
PI
j I
I
i
1
L w
I You owe it to yourself and your community I
t to attend this exciti g and unique conference
L J Visit the NLC webs www nlc or 0 register
299
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
u
1IIIIlIIOl I
MEMO RANUM
TO Todd Gerhardt City Manager
D
Paul Oehme Dir Of Public Works City EngineerFROM
DATE October 22 2007 o
SUBJ TH 212 Project No 03 09 Approve Resolution Supporting
Improvements Bill
The Southwest Corridor Transportation Coalition SWCTC has asked the City to
send a support letter and resolution to our federal Senate Representatives for
support ofTH 212 continued improvements As the Fiscal Year 2008
Transportation and HUD Appropriations Bill moves to the Conference Committee
to work out differences between the House and Senate versions of the Bill the
local communities have been asked by the SWCTC to support the inclusion of the
1 million in the Senate version of the Bill for improvements to TH 212 The
funds would be used for spot improvements additional environmental
documentation and preliminary design work
Residents and businesses in the area have been waiting for many yearsfor needed
improvements to this major transportation corridor The safety issues lre very
real and additional traffic on this highway will cornpound the problerns
Additional funding is needed in order to continue to make progress in improving
this critical transportation facility
The region s economy and safety are dependent on investments to meet the
challenges and growing demands as the number of residents increasesiand our
infrastructure ages
Attachment
The City of Chanhassen A growing community with clean lakes quality schools a chamning downtown thriving businesses winding trails and beautiful parks A great place to live work and play
g eng th 312 th 212 improvements letter 102207 doc
300
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
DA TE October 22 2007 RESOLUTION NO 2007
MOTION BY SECONDED BY
RESOLUTION IN SUPPORT OF FUNDING FOR HIGHWAY 212
WHEREAS Highway 212 is a major US highway serving the southwest portion of the state and
has been in need of expansion for decades and
WHEREAS forty one communities and local chambers of commerce have passed resolutions
supporting improvements to Highway 212 to expand the capacity of this highway and the Board
of Commissioners of every county along the corridor has passed such a resolution and
WHEREAS the current highway poses serious safety problems as it switches from a four lane
facility west of Chaska to a two lane highway then switches back to a four lane highway around
Cologne and back to a two lane highway from Cologne to Norwood Young America and would
be much safer and much better able to handle present and projected traffic flows if it were a
continuous four lane highway through this area and
WHEREAS Congress and the State of Minnesota have recognized the need to expand this
critical trade link to the Twin Cities Metropolitan Area and have previously provided funding
through the ISTEA Transportation Authorization bill TEA 21 Authorization bill the 2002
Transportation Appropriations bill the 2003 Transportation Appropriations bill the 2004
Transportation Appropriations bill and SAFETEA LU and
WHEREAS the completion of the expanded Highway 212 from Eden Prairie to Chaska will
occur in 2008 bringing additional traffic to the section of highway between Chaska and
Norwood Young America which needs to be improved for safety reasons and
WHEREAS an appropriation of 1 million for Highway 212 expansions between Chaska and
Norwood Young America was included in the Senate version of the FY2008 Transportation and
HUD Appropriations bill and
NOW THEREFORE BE IT RESOLVED that the City of Chanhassen strongly supports
inclusion of funding for efforts to improve and expand US Highway 212 in the FY2008
Transportation and HUD Appropriations Bill
301
Passed and adopted by the Chanhassen City Council this 22nd day of October 2007
ATIEST
Todd Gerhardt City Manager Thomas A Furlong Mayor
YES NO ABSENT
302
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
October 22 2007
Senator Amy Klobuchar
United States Senate
CT Y 4 Russell Senate Office Building
Washington DC 20510
Via Fax 202 228 2186 and e mail mark wilson@klobuchar senate gov
Senator Norm Coleman
United States Senate
320 Hart Senate Office Building
Washington DC 20510
Via Fax 202 224 1152 and e mail Jordan talge@coleman senate gov
Dear Senators Klobuchar and Coleman
As the FY2008 Transportation and BUD Appropriations bill moves to the conference
committee to work out the differences between the House and Senate versions of the bill
please work with your colleagues to support the inclusion of 1 million for improvements
to TH 212 in the Senate version of the bill
Residents and businesses in our area have been waiting for many years for needed
improvements to this maj r transpon ation corrj Vith i uedrapid growth and
development the demands on our inftastructur reincre
i
Weare concerned about
the section of TH 212 that switches from a fourane highway west ofChaska to a two
lane highway then switches back to a four lane highway arollnd Colo and then back
to a two lane highway froT Cologn Norw oung ca T afety issues are
very real and additional traffic on this highway ViII compo the p need
additional funding in order to continue to make progress in improving t
transportation facility
Thank you for your support of this project and YQ rworkiuring
state s transportation infrastructure Our economy and safety are dependent on
investments to meet the challenges and growing demands intlIesouthV istmetro area as
the number of residents increase andoutinfrast re ages
Thank you for your consideration of this request Please feeLfree to contact me if you
have any questions about this project
Sincerely
CITY OF CHANHASSEN
Thomas A Furlong
Mayor
The City of Chanhassen A growingl600fimMlly3Nihn q ilrk m Jlll6Ili m ewntown thriving businesses winding trails and beautiful parks A great place to live work and play303
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www cLchanhassen mn us
LY
TO Todd Gerhardt City Manager
I
Laurie Hokkanen Assistant City Manager kP
October 22 2007
FROM
DATE
SUBJECT Certification of Delinquent Code Enforcement Accounts
BACKGROUND
City code requires property owners to maintain their grass and weeds at a
height no greater than 12 inches When properties exceed this height the
CSO s take action including issuing a warning s and citation If the
weeds grass are not cut following these actions the City can cause the weeds
and grass to be cut and assess the charges to the property owner
Each of the following property owners was warned and cited prior to the City
contracting with Beniek Property Services to cut the lawn The property were
also sent two notices to reimburse the city for the lawn services The amount
remains unpaid
Chanhassen City Ordinance allows the amount due to be certified to the
county auditor to be collected with other real estate taxes levied against the
premIses
There were no accounts who notified us wishing to dispute these delinquent
charges
Attached please find a list of properties and delinquent amounts and a
resolution approving the certification of the delinquent amounts
RECCOMENDATION
Staff recommends that the City Council certify the attached fees to the
property taxes
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play304
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
RESOLUTION NO 2007
SECONDED BY
DATE October 22 2007
MOTION BY
A RESOLUTION CERTIFYING DELIQUENT CODE ENFORCEMENT ACCOUNTS
TO THE COUNTY AUDITOR
WHEREAS Minnesota State Statute 429 101 allows for the collection of unpaid special
charges and authorizes assessments for the elimination of a nuisance from private
property
WHEREAS the City Council has determined that the attached Exhibit A represents code
enforcement violations who have been delinquent in paying their code enforcement
accounts for more than 90 days
NOW THEREFORE BE IT RESOLVED that the City Council of the City of
Chanhassen hereby authorizes the City Manager to certify the attached Exhibit A to the
County appropriate County Auditor for collection with property tax certifications being
certified in 2007 collectible in 2008
Passed and adopted by the Chanhassen City Council this 22nd day of October 2007
ATIEST
Todd Gerhardt City Manager Thomas A Furlong Mayor
YES NO ABSENT
305
CITY OF CHANHASSEN
CARVER COUNTY MINNESOTA
NOTICE OF CODE ENFORCEMENT ACCOUNTS
NOTICE IS HEREBY GIVEN that the City Council of the City of Chanhassen will
meet on the 22nd day of October 2007 at 7 00 p m in the Council Chambers at
7700 Market Blvd to certify the following delinquent code enforcement accounts to the
parcel indicated below Amounts certified will be payable with the 2008 property taxes
PIO
25 0710210
25 3490380
25 5050170
25 7400021
Amount to be
Certified
132 00
95 85
165 07
13046
306
OJ
PATROL DIVISION
CHANHASSEN STATION
Memo
To Mayor
City Council
Date 1 0 09 07
oFromSgtPeterAnderley
Re Items for October Council Meeting
1 Sheriff s Office Report September Attached
2 Sheriff s Office Citation List September Attached
3 Community Service Officer Report
4 Miscellaneous Items I will have brief information for Council on recent
activities or items of interest
307
City of Chanhassen
Reports
For
September 2007
308
Listed below is a description of each of the different classifications of calls for service
which the Carver County Sheriff s Office received and processed for your area
ICRIMINAL
Part I Crimes
13A Arson Intentionally destroy property by fire
AA Assault Aggravated Assault where substantial injury is caused or deadly weapon used
B Burglary Breaking into a residence or business
H Homicide Intentional taking of a persons life
R Robbery Taking of property in the presence of another with use of force
SR Rape Forcible sexual assault
T Theft Taking of property stealing
V Theft Vehicle Theft of a motorized vehicle
Part II Crimes
6 Abuse Neglect Chargeable abuse or neglect of children or adults
A Assault Altercation between parties where actual physical harm occurred
OFP Court Order Violations Violation of court orders
DP Disturb Peace Chargeable disturbance of peace Harassment disorderly conduct
D Drug Violation All drug violations possession of sale of manufacture of
G Gambling Unlawful operate promote or assist in the operation of gaming
LV Liquor Laws Illegal Consumption sale or possession of liquor
M Misc Criminal Minor offenses that do not fall under any other classification
P Property Damage All damage to property including vandalism littering and trespassing on propert
5R Runaway Juvenile runaway
S Sex Crimes Misc sex crimes criminal sexual conduct sexual abuse pornography
indecent exposure
30 Suspicious Activity Suspicious activity where charges result
U Theft Related Fraud credit card theft ID theft issuance on bad check counterfeiting swindle
J Traffic Alcohol Traffic stop or accident involving a driver under the influence of alcohol or drugs
1 Traffic Other Traffic stop that results in a traffic criminal charge DAC IPS Hit and Run
W Weapons Violation of manufacture sale purchase transport use of firearm
309
NON CRIMINAL
6 Abuse Neglect NC Investigation of abuse or neglect of a child or adult where no charges are filed
AD Adoption Record Check Records check for persons adopting a child
3 Alarm Checking on an alarm at a private residence or business
9 Animal Animal bites stray animals All calls involving animals
12 Assist other Agency Assist other law enforcement office state patrol or government departments
54 Auto Accd Fatality Auto accident in which a fatality occurred
52 Auto Accd Injury Auto accident in which injury and property damage occurred
50 Auto Accd Prop Damage Auto accident in which property damage occurred
51 Auto Accd MV vs Deer Auto accident involving a motor vehicle and deer
20 Boat Water All incidents involving boats watercraft and or lakes
CCA Child Care Assistance All background checks for soc Ser Unlicensed child care assistance
60 Child Custody Dispute Incidents involving dispute over child custody
16 Civil Process Service of civil papers court orders Assist with civil stand by situations
DP Disturb Peace NC Noise harassments disturbance of peace where charges are not filed
4 Domestic Verbal argument between parties where no charges are filed Must have relation
80 Driving Complaint Complaints of bad driving behavior
D Drug Information Information regard drug activity No charges filed
EP Employment Background All background checks for employment
13 Fire Call Fires and assist to fire departments
24 Gun Permit Acquire Application for a permit to purchase a handgun
25 Gun Permit Carry Application for a permit to carry a handgun
26 Gun Permit Transfer Applicaton for the transfer of one registered gun to another
27 Explosive Firearms Dlr Application for a permit for explosives or firearms dealer license
11 House Business Check Check on residences or business when owners are away from property
LDC License Day Care Background check for licensing day care
LFC License Foster Care Background check for licensing foster care
LL License Liquor Background check for liquor licensing
LP License Peddler Background check for peddler licensing
10 Medical Assist persons with medical issues natural cause deaths
15 Mental Health Suicides 72 hr holds for mental health issues
1 Misc Non Criminal General law enforcement questions citizen assists lost and found property
civil matters council packets and meetings juvenile disciplinary issues etc
5 Missing Person Missing Lost person
NC Name Change Court order legally changing an individuals name
31 Open Door Located an open door to a business or residence
14 Prowler NC Person on property who does not belong window peeper No charges filed
99 Sex Offender Tracking Request from State to check location of registered sex offender
30 Suspicious Act NC Suspicious persons acts or vehicles no charges
21 Snowmobile All incidents involving snowmobiles
8 Traffic Mise Misc traffic issues stalled vehicle debris on roadway traffic control
parking violations vehicle in the ditch and motorist assists
88 Traffic Radar Display Traffic Speed Radar wagon
38 Traffic Stops All traffic stops initiated by officers
17 Transport Transport persons for various reasons
2 Unlock Veh Bldg Unlock doors of automobile residence or business for owners
18 Warrant Issued Warrant issued by Carver County Court Administration
19 Warrant Service Service of warrant for Carver County and other counties
310
CARVER COUNTY SHERIFF S OFFICE
City of Chanhassen
Month of September 2007
ICITATIONS
2007 2007 2006 2006
I M TH I 2 I I M TH I 2 1
rimes
4
3
47
o
o
2
251
11
nmes
Part II Crimes
Abuse Neglect 0 0
Assault 2 38
Court Order Violation 0 8
Disturb Peace 7 80
Drua Violations 1 31
Gamblina 0 0
liquor Law Viol 3 41
Misc Criminal 3 21
Property Damaqe 28 220
Runaway 1 25
Sex Crimes 0 9
Suspicious Activity 0 0
Theft Related 12 85
Traffic Alcohol 6 57
Traffic Other 0 2
Weapons 0 0
rotal part II Grimes 63 617
ITOTAL CRIMINAL 935100
0 0
0 3
6 40
0 0
0 0
0 1
33 313
2 22
41
0 6
7 66
0 16
3 53
3 22
0 0
6 34
1 30
27 209
2 17
3 15
0 7
9 84
8 65
0 9
0 1
69 634
110 1013
311
2007 2007
MONTH I YTD I
INON
IAbuse Neqlect not charaablel 1 31
Adoption Records Check 0 0
Alarm 77 837
Animal 39 449
Assist other Aqencv 7 86
Auto Accd Fatalitv 0 0
Auto Accd Iniurv 6 67
Auto Accd Proo Damaqe 40 387
Auto Accd MV Deer 6 27
Boat Water 5 86
Child Custody Dispute 1 13
Child Care Asst Unlicensed 0 3
Civil Process 0 19
Dist Peace not charqable 44 321
Domestic not charqable 5 54
Drivinq Comolaints 55 480
Drua Information Onlv 1 14
Fire Call 18 179
Gun Permit Acauire 4 67
Gun Permit Carrv 0 42
Gun Permit Transfer 0 0
Explosive Firearms Dlr Permit 0 0
House Business Check 0 17
License Dav Care 5 28
License Foster Care 0 14
License Liquor 0 28
Medical 62 491
Mental Health 6 54
Misc Non Criminal 62 652
Missina Person 3 25
Open Door 2 21
Prowler not charaable 0 11
Snowmobile 0 13
Suspicious Act not charaable 94 822
Traffic Misc 96 1153
Traffic Radar Disolav 0 0
Traffic Stops 417 3059
Transport 0 1
Unlock Veh Bldq 8 94
Warrant ServIce 13 105
fOTAl NON 1077 9750
ITOTAL REPORTED 1177 10685 I
2006
MONTH
2006
YTD
7 47
0 5
96 685
57 381
16 101
0 0
11 69
37 118
4 26
7 63
0 17
0 0
2 9
29 332
5 48
40 404
1 19
12 183
11 54
2 26
0 1
0 0
0 10
0 36
5 26
0 1
48 440
4 37
51 558
5 27
5 59
0 7
0 7
86 818
108 1175
0 1
379 3397
0 1
8 92
16 69
1052 9349
1162 10362
312
W
U t
LL 0
LL 0
o a
en
u
WOZOWWIenwenent
ZI C
JZO
O t
U o
O LLWOW
O t O
0UUN
e IC a a NL
N M
E POJ
3mE
E
OJ
L
0
B
Q
N MOJaC000
D C
1Il
l CClNaLaaaC
a a 0 a a a I ar
OJ
c a a C a a a co
N
a a C a a a co aN
L N iNaaaNN
J
L a a I a a a L C
co
l
g a a C a a a
N
co
l a NL a a a 0
c
C enOJC1lcoE
co OJ Uen
C1l u
E EXOJ 1
I OJ IC
l OJ I
c Ip 0
1 0 co E1Il1IlL 0 OJ OJ
d 1Il l 0 0 co c c 0XenI00ffI
co a a L L IaCcocoCaNNN01acoL Na 0N
0 N 0 I a C Cco 0 0 N 0 a aN
a I a a a N 01 C a a CD I a aC
a 01 a L I a 0 01 N a N a a PCI
a C CD L a L a a 01 I a gCDI
a N N a a C01 L Ca CD a a
a co N a L a CD a co a a a g
a N co N a L co N a a N N a a
a N a co N a 0 NN a C a a
a L I a a NL a a 01 a
1Il
C en0C1l
56SUen1Il0coUC0
OJ c ro E OJ c L
C1l OJ 0 X co 0 OJ
E g L co co 1Il cOJOJcoEClOJ1IlQi0 18OJCiUllJl
Z L a6 co C E 0 0 c0JII
0 C u I 0
OJ l L 0 L
0 a
1 1Il co t l g E 0 U co E E co lU
l 1Il l l 0 c x 1Il OJ co co OJ01Il0Lco2LlOJlcLSXXClClCJ2a0ffff
313
r
I 0 I 0 0 N N C 0 I
0 C to 0 I CO I to C C 0 N CO l I N0 0 I CO CO 0 I I CN I 0 I
0 0CCOCOtoCNCOCItoNNItoNNCO0
C
ll
U
E
ll
08
Q
I 0 0 I CO N N to I coCQ0I0totoI00I0000I00toMN0000IMIto000
a
iii
l 0 CO to 0 0 N CO N NNOJN00toN0CC1lN000N0CONN0C0C0IClNI0M
10 0 I 0 0 C I 0 CO 0
N 0 C1l 10 0 to N C 0 to I to N I 0 0 0 0 to to to I N 0 N I 0 I 0 C1l
C
ll I IeICO0ICO0to0NCC0COto0CC0NIII0000N0toCONC0N0I
N
C1l
C0 I M C1l 0 CO NC CO 0 0 CO 0 I I 0 0 0 C 00 N 0 C CO 0 0 to N 0 CO 0 I
CO 10 I C N I CO N
NC1lCCOtoNN0C1l10CO0COCICNCNI0Ito00CC0NIN00ICO0N0 CO 0
C
f5 0 to0I000CCNNIIII CI000I000CNNI00ClNI0I0NClI000I
N
l tofQI0COtoI0II000NtoC1lNCIC00000toCOC0NC0C0 CO
C1l C N C to C
ro I Ilto0II0C1l0NNto0ICO0000toNC0I00tolN0N 0 C1leCOMCCIto
l g
U ll g l
ll E ll ll e 0 U ll
1 c I ro 0 I e 0 2 ll 1 a01IEllllcllroro
Ii ll e e E ll
I
e ro g ll I
I
e Q ro e 5 lg0
I 5 ro ro ll ll
I iij ro u ro ll ll 0 E e u0rollltueQaIllll19llll110lc0roIlgCDllUullllUEIIIellIgll1UllllEu0ro0
rg I I I I 0 ro Vi 0 0 c llllrollEuJllllro
0 0 0 0 iii ll ll 0 E E E ll e 0 ii a U5 1 llJllcuuuuUQlllIIIJQ0l
Z e 5 l ro 0 e co 0 0 0 g0uuuuiiiIgrollllllllllllroz0EIII erocllrollul
I ll Q I Q Q Q ll ll ll ll U U U coEll0e0llU
E Q Q l g ll e e e U E00000roESlleeeIplllllll0ell0ll e Qll55S0rocororo ro0roellll0cc0lllX0UUUllllele
co i300 0 0u C9 C9 C9 W J i i i a a a a 0 Q J J l I l I
314
E
e
z
E
00
z
o
E
E
U
I
o
o
N
o
M
l
c
f
I
o
o
N 0
V
NCIlO
Q
ell I
r
o
o
t
V
o
o
II
zzz
o
l Ul
M1
0
V 019
o
OZZZ
I
N
I
N
V
I
ZZZZZZZZZZZZZZZZZZZZZZZZZZzZ
z
0 0
Z
CIl f g
I l u Vi I I
g l g gUiHo6aooag
2 u 2 013
U I v 0 U v CIl tLl 0 CIl 0oQur000
CIlCllZl CIltLlOr ZZtLlOZo l
c
o
v Vi I I
U Ul U
1AOJen OJ
o ci 0
LoL VJO s5oB215b b
roolrororoo g ogrrrauOou201301322cuz0u
8 b C S
e ooe
tLlo lolt LltLl 5r CIlCllCllZZr
QJ
0
o
U
v
U
t
ro
U
Cl05
o
o g
v I v I CIl 0
0
CIlCllCllCllOZ
I
eo
ro
l
t o
c OcCIlOCll
001
01 1 1
J
g 0
000 1 01 0 00 OOOO OOOOO1 O O
g Mg a a8 gg ggN gg gg gn g
ol
tro
l
g
1 o t2tLllog0
ctE Ool I
or n
l
rrrci oJ
o
o
ro I
ol ol ol U
c
I 1 0uEeci5nc
ol ol ol I C I 23 e1jolOu
c c c c c g s
ol ol ol ol
I I I I I a nvECOIo0roolroolrol0jlllllcir80N
NNNON
o
I
ol I
U
I
g ol 3oEtroec
cJ t N N
l ro
I roC4 N
g 0
r r r
I
0 o
0
o
U
N
N
r
QJ
r I I I I I I I I I1000000000000000000000
O t ttt t
aJ NNNNNN
l S S S S S S
0000000000
I
o
o
rl
o
o
1 1 1 1 1 1 1 1 1 1 1 1
000000000000
000000000000
rl r r r rl r M 1 1 1 1 1sssssss
0
000000000000
r 0V 1 V 1 1
l 1 rl Ov O1 ON
za A
rl rl r M r M r M r N
C r M r M M M M r M r
00000000000gggggggggg
0000000000
Ogggggggggg
V
1
M
M
o
o
o
o
o
o
1 nOI N
OOOONO1 OOIII
r nv v NN11111N1nNNN
14 N MM lNNM
r M r M r r r M r r M r
000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
I 8aaaa8aaaa
o
V
N
o
000000000000
nV V V V V nV V V V V
NNNNNNNNNNNN
000000000000
2
o
r
x
o
CO
g
6
cVro
v
rCi
i
r ClO
v I
E2UU
u
33
olo len
0000
r
I I r I I
00000
00000
1 1 1 1 1sss
000 00
O NrO
oo oo
N N N N N
NNNNN
r M r M r
00000
00000
00000
00000
00000
00000
00000
V V V n V
NNNNN
00000
r
c c
5
0 0
cl
E c c
ro 0 ro
c
o go
r I I
000
000
N N N
1 1 1
000
000
r O
0
N N
N r N
r rtrl
000
000
000
000
000
000
000
V V V
N N N
000
315
Ec
C
Z
Ec
00
z
o
Ec
Ec
U
r
o
o
N
o
M
0
l
cE
r
o
o
C 0
N
Cl 0 0
Q
tlJ co
CQ
r
o
o
C
S2
o
0
co
I
en 0
ZZZZZZZZZZZZZZZZZZZ ZZZZZZZZZZZZZZZZZ
o
I
Cl
E
I
f
CI
g g g Cl
l ll e
s ssf CIociooZ0
0l 00e
OOeg ee
l l o 0 0 0
s G
l
u
c c
ol 5 5 0E
s cc 0
M M
f f u
gO Oc
0 00 ol
U l v l 0 0 0
o fto 0 0 0
ClCl ClZ IJZZ O
OOl O MMO I O
I I r r r r r I
OONNNooO
0 0 0 0 0 0 0 0 0
s2
o
I
o
0
0
l
cu
0
o
U
uO
01
J
0
CSCS
l l
l l
Cl
000
r
cu
r r r rcoooooQOOOO
OcC ClC
cul I 1 I
0000
O O O
0 0 0 0
0 I r
oooooo
z
N N N M
C I r1 I M
00000
gggg
0000
Ogggg
I 8U
cscscs
ol ol ol
0 0 0
c c c
c c c
e e e
l l l
ol ol ol
Jl J
000
000
r r r
r r r
000
000
N N N
1 1 1000
0 0 0
000
00 0
0
M r M
M M I
000
000
000
000
000
000
000
N N N
000
1
u
Col
l
C
o
o
OO Oe
l l l 0
l l l 0
z
o
I
o
0
0
0
l
cD
CSCSCS
lo l
UUU
It
ECO2 22
ol CO CO CO
0ol
l l
o
o
OOOOOOOOO OO I I O O
x 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 cs2 l s2s2 s2s2 Cl
2 0 00000 t
CO I EI rI rI
0 0
b aa aa aa a Cl
o NOO O O O O O COOECOU509ClcVVVVV
G 5 6 S5JOttCCCloJIolE
ol ol t
j 22 02 2 2 l 2 O SJI0000oOoIUoI
l l l
u S u
C
l l lClCl
o 0 s
t b
C COo0UUO
OO OO OO OOU OOUO
l 1 l 1 l l l l lEl l lEct
l 25 eo
Cl ClC lClC lClC lCl f CI CI f Z
01 001 1 1
I r I I r r r
ONOONONN
0 0 0 0 0 0 0 0
000
r
r r r r r r000000
000000
C C C C C C
S2 S2S2S2
v 0 v 0 0 0
000000
r I r N
0 0 0 O O M
NNNNNI
00 00 00 00 00
NNNNNM
I M rtM f r
000000
000000
000000
000000
000000
000000
000000
V
NNNNNN
000000
0
2
CO
l
o
0
0
0
U
l
l
l
j
J
r
o
o
N
o
0
o
r r r r r r r r r r r r r r
00000000000000
00000000000000
c
OO OO OD
S2 S2 52S2S2S2 P
0 0 0 0 0 0 0 0 0 0 0 0 0 0
00000000000000
V
I
O MO NOOO O N MI NINOOOOOOOOOOO
I r N N N N N r M r 0 M rl
N0000 00 00 00 0000 00 0 00 00 N
rlNNNNNN INNNNNr
rfM I M I rf r1 rf r c f M C f
00000000000000
00000000000000
00000000000000
00000000000000
00000000000000
00000000000000
M
r
o
o
o
o
o
o
o
N
o
00000000000000
NNNNNNNNNNNNNN
00000000000000
l
U
C
ol
t
o
02
0
l 0octcl
v 0
Cl Z
0
f
0
O
lol
0IJCI N
c
C
0
s
0
0
l
E
co
Vi
00
r
r
o
o
N
D
o
0
o
r r
00
00
N I
D 0
00
0 0
00
r
N
r
M
o
o
o
o
o
o
o
n r
N 00
r N
rf r
00
00
00
00
00
00
o
n
N
o
00
n
N N
00
316
o
z
00
Z
o
U
I
o
o
N
o
M0
2
c
f
I
o
o
0
V
N
en 0 0
Oi
0
00
QJ
al
I
o
o
V
o
II
zzz
I
I
I
o
ON
v
0 0
OZZZZZZz
I
I N
N 0
00
I I
N N
V V
1
1 1
I
1 I
000
N N V
0 0 0
0 0 t
M zzzzzzzzzzzzzzzzzz
o cn cj
JJ c Bi 0
Z
0I0E0 0 0 ti t t
O 000 E E C
cO LllLl ll 0 0 0
Z 0 0U 5 Z t 0 0 0 l l E E l V l
x 5500 U u
o t MM t O MMUU UiojJlZUMocOUUt0 0
C ou 00Cfl UUl 00 E I t I I I I
O 1 g g M M en en 0 11 Z g g 0 g 0 Z g cO 0 0 0 eJ cO tJ cOgen00ut6EE000uC550enE0QenQQQQQQUe22522000t
enenUE ZZE enenE E OOOenE E o o o t t zozzooooo o o o
QJ
0
o
U
uV
00
J
o
000OV
MO
00
t t
00
0 0
iii
C C
ro S
00 0
s
0 0 0
er er er
l
u
C
0 ro2EcoO
oa
E
C 6 t
ct tg cO
rorol enen13OCXlOO0000111
J 0
QJ
1 1 1 1 1 1
oooooo0000000
o C
QJO OO 00 0
52 2 S
g g g ggg
OI OOOOt t
ggZCXlOOOOOt
NNNMNM
I M
0000000
gggggg
000000
CJgggggg
15 5 5 5 5 5
NNNNNNaloooooo
0 to 00 0 0tlottOO
NNOOOOO
0 0 0 0 0 0 0
co
OO
l
a l l
o l l
Lo
UUOattCIJ
ii5ii5t0
f5f5 al
f3 v
V CI
ro C
9 9 ro
p p o
V 0
2i
cl
0
al
V
6 t
I I I I I I
000000
000000
C C
I I I I I 00
ooooo00000 0
000000
OOV v 1 t
OV I I I NI0000I
NNt MN
M M M N
C rf f f tf ri
000000
000000
000000
000000
000000
000000
000000
V V V V
NNNNNN
000000
zz
00
5 0
t UN
OO
M
OOOOOt tOOO toootOOOOOOOO
88
l
cO
0
C2
til
1S
00
e i3
N lno
g
r cr
o
r
N
0
I I I I
0000
0000
N N N N
00 00 00 00
522S2
0 0 0 0
0000
M OO
tClI OIOt
N V
NMr
r rfr I
0000
0000
0000
0000
0000
0000
0000
V
N N N N
0000
OO
o
1
c c I Lo
t o
5 l l l ro
E t t 2llroll
en en 0
C
0
0
l
oroo
lI
o
000
V N C1
I 0 0
I I I I I I
000000
000000
00 00 00 00 00 00
0 0 0 0 0 0
000000
N 0 1 00 0
M 1 1 0 0 0
00 V 0 0 I
N N
MMCf Mr1
M M M
000000
000000
000000
000000
000000
000000
000000
V V
NNNNNN
000000
o
r
rNE
N
tp
I I
00
00
N N
0 0
00
0 0
00
0 00
t N
t 0
M
I ri
00
00
00
00
00
00
00
V V
N N
00
l
1 o
ro
C
0
E
l N lJ
lX8
N 0
ro l00
C C
ro ro
3 3
en en
l l
ro l
ll
LllLl lll
000
l l l
ro l rolJl
000
0 0 0
I r I r I r r r
00000000
00000000
C
0 0 0 0 0 0 0 0
00000000
0 0 0 0 0 0 0 0
00000000
r OOOItv
OO OOr 1
00 00 V
OON Mff l
NMfMCf r rlM
iff rl t r1rl C
00000000
00000000
00000000
00000000
00000000
00000000
00000000
V V
NNNNNNNN
00000000
317
z
rFJ
l
Z
o
u
r
o
o
o
M
0
2
c
f
r
o
o
N 0
on
NCl00
J l
Q
eJJ
r
o
o
on
o
o
o
E N
r
I
0
ZZZZZZZZZZZZZZZZZZZZZZ ZZZZZZZ
o
N
1
N N
Nr
o 0
0 0
ZZZZZ
Cl l
U
lJUi8E
0q2jC
OJ e 0 0
U
l oj u
c rJUCl 4
orOUE
s s
l l
E E
0 0
0 cr
l
ta
l
Vl
5VlCl4
cOSo4
ll0
00 000 2
l l l eo bO rJ
0
Cl CI CI Z
0
o
U
e re
w u W
o Jo
Oeo 0 00
Cl c O
E 25 c co 0
l 0 J e I
g g g g g
U l U B BU8wos
OCl c 0 WUVl C wor0rJo0OErJleojOOcooojOOlcoE0JVlEuoj00CIJ
loog og SVlo ooSo000oj000000
bI CI 0 c CI c l E l l E c rJ E CI
o o l ooooo ol CI uol l l ooO o
Cl CI owZZCl CI CI oz 25 zzoooz
o 0CONOOOOO1OOOOO1NOOOO1OMMOOON11Moon
ON1 1 1 1 r 1 1 Nrr O1 1 1 Nr1 r 1 1 Nrr l Nr
O Z Z
c o
l l
o oj
9 8 8
0 0
C co 00 00
o Vl coow00llrol
oo llococoO
c e ccOoonoonlleJECen enulll0orScuuorr
0
r r r r r r r r
ogggggggg
o O O oooooo
g g g ggg gg
on t 0
1 1 onZ
MMrNNN
C r M rl M rl M
0000000
gggggg
000000
ugggggg
N r 1
M rl
N N
rl fl
00
00
00
00
00
00
1 88888888
c ol
e05
0 0 CEo
0 EcoU
c0
0 0
o co
conl 0c
l o
cuo
r r r
000
000
Cl
000
0 0 0
000
r Or 0
on N
M
M
r N r
C f f f
000
000
000
000
000
000
000
on on on
N N N000
0
co
C
l
c
l
on
r
0
l
g05
C u
OWllt o
JOs
o o5
ti
N CON
05
engg
c c
r
o
o
o
0
o
r r r r r
00000
00000
000
0 0 0 0 0
00000
r
N
rl
o
o
o
o
o
o
1 0 0
01 0NonMonon
1 on NN
r MNMM
MffjMrf
00000
00000
00000
00000
00000
00000
o
on
N
o
00000
on on on on on
NNNNN
00000
00
oo o co
Ue U
It coco4e
u Vl Cl 4 l
o U 2
e O
u o ci
9 e E co
co U
ou gol9 0
c cocc
r
r r r r r r
000000
000000
NNNN
0
o
0 0 0 0 0
00000
00 o r
Nrlr t r
on 1
N 0 0 rl on rl
rif1 C rf1 r
rl ri I I rl rl
000000
000000
000000
000000
000000
000000
000000
on on on on on on
NNNNNN
000000
t
J
oj
00
e
O
eOd
lr In
rr
r r
00
00
N N
N N
0 0
00
1
r V
r
1 r
M M
r M
00
00
00
00
00
00
00
on V
N N
00
0 0 0
l l l
l l l
0 0 0
CI CI CI
1
o
N
N
r
000
1 1 1
000
0 0 0
o 0
gg r
rr
o
f
0 0 0
e e
3 3
l l v
c c coojroVl
ol o o
o o c
r
o
o
N
rl
0
o
r r r
000
000
M r C
0 0 0
000
0
r
rl
rl
M
o
o
o
o
o
o
o O
N
rfj M rf
N N N
t r ffl
000
000
000
000
000
000
o
on
N
o
000
on V on
NNN
000
318
z
1Jl
l
Z
o
u
r
o
o
N
o
M
0
c
f
r
o
o
C 0
V
NCI00
cl
C Q
ell
r
o
o
C
V
o
o
II
zg
W
CI
CI
o
cC
C
CI
oIJUJl
o
U Q UJQ
Ql
0
C
U
I
V
I
ION N
I 0 0
CC 7 7
O O N N
ZZZZZZZZZZZZZZZZZZZZZZZZZZ V ZV ZZZz
0 CI crCiSZUlUJ
P2 g00 0
UJOcc
l l I ICUJcEc
OOOCt C Il
OOZOOocC
llJcG Cb C ra
Q f c Cc 5CIIll00aJgl5
09 0 c 0 ogOUuOoOc1JJg0
0 0 u l D l 0 CI
Q Q CC JE J Q o c
cGOO eo 9 0
Cl CI O Oc OCJCI ZUJ
Q Il Q
19 g g
Il o
Ul0C00 00
a a a
c o Q Q Q c cCc O O
t uuuC000Q0 g 2 g
2 2 g g e 5 2 2 2 2 5 5 5 e en e ct ct
Q Q 0 0 0 Q Q Q Q 0 0 0 0 C 0 0 0 0zEoooEoEzz
00 00000
c
t 8
0 0 U
oJ tt
5UJ
N
tJooV O NOOO O Ooo
c r o r r OJOcCONONOONNOOOOOOOOOOOOOOOOO
cs V E
o 0
o r
eo c xUi30 00 0
oo og o O O
9 c cCOc c
Q co Cro 88E0000gg
CO s 5 CI
oCOw CC c
J Lo l cc C C OEQcrVV
oocDtEllgt0
Ucl Zl rc rr f
i
c N
co 2
c9UJo
tI
csoo
Q
0 c
G
C uOCllUBlQaSli
i5c jOi
J
Ql
r
oCo
OC
QlM
O
0
r r r r
0000
0000
N N N N
f f M
0 0 0 0
0000
NNMO
o CZ00fl00 V
N M N M fl
CflMMMf l
00000088888
00000
u88888
0 0 0 0 0
V onV onon
llNNNNN
lQ00000
on
00 0 0
ONOr r r
OOOOOOOOONONNN
0 0 0 0 0 0 0 0 0 0 0
o 0
flOO ov O
u Uf U r r
00 0
0 00ai
Q i
c Q
cooolBl
cCllCI olcG
g ro
so aS g
ct l
o
r jon
00
r r r r r r r
0000000
0000000
t
0 0 0 0 0 0 0
0000000
r r r r r
00000
00000
C C C C
V on on on on
0 0 0 0 0
00000
r r
00
00
N N
V on
0 0
00
r r
00
00
N N
on
0 0
00
on 0 r 0 00 0 f M M on on
NNNNrNOONMMOOOOOOM
M fl M fl M 0 M 00 00 r r r 00
00 00 00 00 an 00 tf00 M M
NNNNMNMNMflMf lMM
M fl M fl M fl M fl M M fl M fl M
00000000000000
00000000000000
00000000000000
00000000000000
00000000000000
00000000000000
on
r 0
V V
M M
fl M
00
00
00
00
00
00
0000000000000000
on on on v on on on on on v v V v on V on
NNNNNNNNNNNNNNNN
0000000000000000
00
00
0 0
c
zl o
co
ro ooEonC
0lc
5 n
g
r
r r r r
0000
0000
N N N N
on V 0 0
0 0 0 0
0000
NOONO
r 00 r
lrl Mtl
M f M rf
fl M M fl
0000
0000
0000
0000
0000
0000
0000
on V on V
NNNN
0000
0CS
co
C
u
8
co v
r
r r
00
00
N N
0 0
0 0
00
r
0
V
on N
M M
M fl
00
00
00
00
00
00
00
on V
N N
00
0
0
2
C l
ol c
U
r
c
r
r r
00
00
N N
0 r
0 0
00
N N
0 00
M
fl M
fl M
00
00
00
00
00
00
00
V on
N N
00
c
o
E
ClJ
o
cJ
N
I
0
0
ol
c
0
0
c
o
D
l
8
r
o
o
N
r
o
o
1
r
0
o
0
o
r
00
r
fl
M
fl
o
o
o
o
o
o
o
f
0
fl
M
fl
o
o
o
o
o
o
o
on
N
o
o
V
N
o
319
C
Z
00
z
o
u
o
o
N
o
M
l
c
f
o
o
N 0
lr
N
O
OJ
Q
eo C1
o
o
C
lr
o
o
l
C1
zzzzzzzzzzzzzzzzz zzzz zzz
N
I
ZZZZZZZz Z
Ul
o
0 0
r
00
0 Q
0 I
I Q 0CIl0g29Ue9J9gwrgt
9 CIl CIl CIl 2 Q 9 9 9 CIl CIl ggcggrl0ggCO 0EEE0EEetE 2
0 0 0
J g gO 0 J 8
1A 0 E e 6
Ul UlU lJQ O E OOUl UlQE0OJ
0 0 0 0 0 0 0 0 5u0o
0
o
U
C1ColO
01
J
Q
u
Q
Q
o
c
o
U
u
fC
E
00 00
g 0 0 0 0
0
00000001 0 O01 1 00 1 1 0 011111111OOMN11011oOOOOOOOONONNNNNNOOOOOOOOOONON
o
8g5 2z
I I
C C Q Is2rC1II
O oUUEs2EQI 0oOo
et Eet 88
u
It
c CQCO lcoIICOg1000
O uuOJ
o
Q
2Ur
l U 1 85lt0gp8 UU21ltOUCQO22gti2c
CO E CO N N
c S C CJ
0 I IN 00 lr N
l eco9IQ
u gg UClr CC
N lr 00
C1000000000000000000000000000000000
oooooooooooooo
O NrlOO 1 rllr lr O NO
ZOOOOOOOO MOOM 1 OOOOM1 M1NNNN00MNMrlNNMrlMrl
CM MMN MM MMMMOOOOOMOOOOOOooooo
0000000000000000ggggggggggggggggOgggggggggggggggg
15 5 5 5 5 5 5 5 5 5 5 5 5 5gggg88888g8g88gg
0
et
o
0
l
C Cl l loogg
1 00 l I
I ll Clttgg2IItCQ55nnfiicl5c15
o EO
rl c r3 00 00
rl 0 0
0 00 00
QQCl
I I Q
I I I
uuu
I I I
C
000VcnV5
Cl Cl 0222
CO CO CO
li000
uuu
c
Clr
5
iCIl
et 1
lr
c
0000000000
0000000000
NNCNC NCNNNOOOOoooo
00 00000000
00
00
N N
00
N N
00
O OOONOO OM n
NrlMOOMr lrlr lM 1000000rlMrllr10
rl 0 rl M 00 00 00 N lr rl
rlMMNMr lNNNrlMM
r rfj M f rfM M I M r M
000000000000000000000000
000000000000
000000000000
000000000000
000000000000
000000000000
lr lr lr lr lr lr lr lr lr lr lr lr
NNNNNNNNNNNN000000000000
lr g
0
c15gCcc15
V1 @ 0
CA OQJ
OJ
Ol
Cl
2 ClCl
CQ
C
guu
Q lt ltull
lr CQCO
o 0
C5 5
0000000
0000000
o
N
o
C C C C C
v
000000
O OO CIlrOO1N1100000rllrMrl
OOOONOOOO
MNNNMNN
MrlC t f tf r
0000000
0000000
0000000
0000000
0000000
0000000
0000000
lr lr lr V V V lr
NNNNNCIN
0000000
320
z
rF1
l
Z
o
u
r
o
o
N
o
M
0
j
f
r
o
o
N 0
V
NCI00
u
C Q
tl
r
o
o
V
o
o
II
zzzzz
N
r
I
0
zzzzg
0
v WlvCl
gog0
CI
25
13m
r
oWlvU
3r
i Wlto
co
OJ 0
c J
ClCl
v
u
v
t
@0
Cl E
S
Cl
o
Wl
vCl
UoClir24Cl S
6 cUci8J8r 8
o U I Cl
E CI E u
CI 1l 5gvo
V5r E O O
C
OJ
Q
E
Wl
0
o
U
O
ot
o
8
S2 z
o
v
v
U
tt
C l
OCO
C o10jV
0 0
2 0
co C 0 0
oen000Bgvce
g 8 8 g
88
00
rr r I g
N N r
0
0
ri
o
00
V 0
0 0
zzzz
I
I
I
ONNo
9
0 N
0 V zzzzzzzzzzzzzzzzzzzz
en
o
DoOX
Wlo
o
r
r 0
I 0 V
J s
0015
8J eoU3J0 oo2
v 0 rJ V V 0
v 000 oriEClWlClCIZ
OJ OJ
c 5
o
V
E
0 V
o us
M
tt
0
0 0
o
oV0V
OV U
Cl
Q
r r r r r r r r r r r r r r r rCooooooooooooooooQoooooooooooooooo
SQNNNNNNMMttt
N N
0 0
00
r t
I
ZooooVO
N N r N
cr MrM
gggg
gggg
Ogggg
N N tMVVtV oN
0 r o o Mo o t o tt V
00 0 t r r 00 0 M r M r V
0 M V r r O N V r 00 00 N
NMrMr NMr MNNr
r r M r M r M r M r M r
0 000 0 0 0 0 0 0 0 0
000000000000
000000000000
000000000000
000000000000
000000000000
I NNNNNNNNN NNNNNN
oooooooooooooooo
Q V
r r
00
V
u
V
Cl
o
c 3
OJ OJ 2J
0 0 5 5 0 0 0 0 CI
g @000000
JJo o CI JCI JCI f
o ootoo
r ttr tt
NOONOO
0 0 0 0 0 0
0
ro
V
V OJ
01
t
0 V0V
2
vo
2
cCO
V V
1
Q
o
o
WlV
ClUvott
l
m
rNr m
VN
6roo
r r r
000
000
t t V
N N N
0 0 0
000
N M
0 00
r r r
lj 1 lj
rtM M
r r M
000
000
000
000
000
000
000
V V V
N N N
000
ooooVOooooo
tt tt OO tNt tt O
0000000C10000
0 0 0 0 0 0 0 0 0 0 0 0
0 CooCloc U
2 gco 0
U U 0 0 5
Q V 0 0 ossgC02rg
J J U V CO W r0cc0J
0 0 0 o 0 0 022022mcocomcWW
c Ei S2coco
Q 22lC V V V
1 55 c gri E
88u r r 3
00
00
0 0
ClCl
0 0
c c
c c
r r
V V
ro
l
00
00
V V
r r
r r r r r r r r r r r
00000000000
00000000000
V n In 0 0 00 0 r r
0 0 0 0 0 0 0 0 0 0 0
00000000000
00 0 00 r N M t V 00 r
tt V V V V V MN
r M r r r M r M MOOV
00 00 r r 00 00 00 00 00 N
NNMrC lNNNNMr
r r rlj Ii rlj rlj rlj rlj rlj Ii
00000000000
00000000000
00000000000
00000000000
00000000000
00000000000
00000000000
V V V V V V vl V V V V
NNNNNNNNNNN
00000000000
U
r
Cl
ci ci
r
Cl
0 00 00
l JQ Q l
Q r Q Q V 0
Cl Jr5
r
r r r r
0000
0000
r r r r
0 0 0 0
0000
0 0 0
Mt tv
00 00 00 r
00
r M r N
fl f rlj r
0000
0000
0000
0000
0000
0000
0000
V V V V
NNNN
0000
321
Ec
iQ
iQ
CJ
Z
Ec
en
l
Z
o
Ec
Ec
U
r
o
o
01
o
r
0
c
f
r
o
o
C 0
n
01CIO
VI
c
Q
OJ co
l
r
o
o
C
n
o
o
I
zzzzzzzzzz
Cl
c
j
0
E
o
U
i
laJVJ0
en
J0 C
111 l
o c0C
U Ci OIJO
0
50C
0
o
U
ll
Cl U
g OJ
t 0
0 00c
0
u
@ C u
c ll
a
O5
I I
1 rf
00
V n
ii
00
tt
w
o
z
ul
u
00
ll ll c5 ll
g g rU5 g
e e Oul e
l l U CI l
VJ VJ l CI VJ
1s
000 ul 0
doggzo g
ct e ct E ul J 2 ct0llOlloE00J00
Z ZCl lCl Z
il 0 t 0 t t 0
oO Or tOr Or t
00
3
0
l
0
s
C
e
2 U
c co
o ul0
il Ol
00
r rCOOOCOO
OCCrr
lNN
0 0
r
Zoo
N
C
00000
co oo
0 0
CJgg
I111010 1COoo
0
2
COUg0ll00slot
n
z Vi
r r
00
0
0
r r r r r
00000
00000
010 1010 101000000
r
00000
ONOOOr
oon oo
o 0 t t
01 00nV
01
0
or ooo
00000
00000
00000
00000
00000
00000
n V V n n
010 1010 101
00000
02
CO
ll
o
e
00
U
s
l
ll
G
l
c
l
5ugEis
e
r CI
9 r
r
r
r r
00
00
C C
00 00
C C
00
o
00 0
0 n
00
00
00
00
00
00
00
n n
01 C l
00
t
00
o t
zzzzz
o
Cl ll
0 0
0 0
ef
0
s
o t t
tr Oor
001000 1
0 0
2 2
COGCO
ell 0 ell
ro
1
05a t0P20
u Uro33nn
jr jrr
r r r r r
00000r
00000
N
oo
C C C Q
00000
rJ
rJ
o rJ
OV V ooZ
01 000
01
Eggggg
00000E00000
gggggu
E
o
E00000
V nV V lIl
NNNNN
00000
v
OQ
ll
E
ul
ell
0
f
0
ll
0
ul
00
02
CO
322
o
z
rri
rJ1t
ZrJ1g
Z N
rJ1 Z
ErJ10 UuE
rJ10
Z
o E3EEu
rJ1
o
u
IeC1
t
Uu
0
C on
N
O
al
t
w
W
u
W
llo
g
I Z
C
c fUCf
UI0
0
Qjc
0J
Q
uo
r
0
0
C NON
1
1 0
0
al
u
0
C1
f g
E
E
I l
Cf
0
O
I 0
00
oo
o
o
10
N
r
on
on
M
o
U g
uoN
o
U
e
C1
Vl
c
a
c
U
e e 0
uu U
e e e
Vl Vl Vl
j j jccc
e e e
j j j
c c c
uu U
o
on
N
o
00 0
on on on
N N N000
on onrr
M M
M M
M M
cr
of
o
E
Cf
E
o
on
N
Cf
Cf
w
w
t
f
wd
00
o
olo
cr
e Cf
w
U Ul
uCfe
w
f ll
ti3gze
Ef
o
00
0
on
0
onM3ezcr
f
0 0 0
r
o
o
r
N
0
o
r r
00
00
N N
0 000
E
U
0
C1
0
0
C1
c
o
E
E
l
Cf
al al
uu
0 0C1C1
l l
o 0
0 0C1C1
c c
o 0
E E
E E
l l
Cf Cf
r
o
o
o
on
o
r r
00
00
0 0
00 00
00
o 00
M
o
M
M
o
o
o
r
o
o
N
0 0
M M
0 0
N N
00
00
00
r r
00
00
NN
00000
u u u u U
e e e e e
C1 C1 C1 C1 II
VJ VJ V VJ V
c c c c c
e e e e ejjjjjccccc
U U U U U
o 0 0 0 0
on on on on on
N N N N N
00000
E
Cf
z
o
u
Ul
w
o
o
o
o
E
c
r
o
o
o
0
o
al
u
0
C1
0
0
C1
e
o
E
E
l
Cf
r
o
o
N
o
0
o
o
o
00
N
o
o
o
r
o
o
N
on
0
N
M
M
cr
o
ll
o
f
Cf
U
Cf
z
w
o
U
u
e
o
M
M
0
r
o
o
N
N
o
0
o
al
u
0
C1
l
o
0
C1
c
o
E
E
l
r
o
o
N
o
0
o
o
M
N
00
N
o
o
or
o
o
N
6
f
ip
ot
Cf
Cf
E
Ul
t
f
o
00
N
M
U
r
o
o
N
N
o
0
o
al
U
0
II
l
o
0
C1
c
o
E
E
l
Cf
r
o
o
N
N
o
0
o
o
on
r
00
N
o
o
o
r
o
o
N
l
s
ol
E
Cf
Cf
w
cr
o
o
onN
w
t
f
0
N
o
cr
f
U
r
o
o
o
0
o
u
0
II
0
0
C1
c
o
E
E
l
r
o
o
o
0
o
o
0
0
0
00
N
o
o
o
r
o
o
N
Cf
E
o
e
f
Cf
Z
e
EC2
u
o
00
o
M
X
U
r
o
o
0
o
0
o
al
u
0
C1
l
o
0
C1
e
o
E
E
l
Cf
r
o
o
0
0
o
o
on
o
0
N
o
o
o
r
o
o
N
00
N
M
5
o
w
o
t
E
u
u
e
f
o
on
o
U
r
o
o
0
o
0
o
0
E
VlC1
r
o
o
0
o
0
o
o
0
o
0
N
o
o
o
r
o
o
N
o
U
e
C1
Vl
c
e
jc
U
00 0
uu U
e e e
C1 C1 C1
Vl Vl Vl
c c c
e e e
j j jccc
uu U
o
on
N
o
00 0
on on on
N N N
00 0
o
r
0
1
M
1
5
o
o
Ul
o
t
E
u
u
e
f
56z
w
oEt
00
Ul
00
tto
u
e
uwu
e Z
w
f
o
I
o
00
1 0
OME
0 0 0
r
o
o
N
00
o
0
o
r r
00
00
00 00
00
0 0
00
0
C1
VlC1
0 0
C1 C1
Vl Vl
C1 C1
r
o
o
00
o
0
o
r r
00
00
N N
00 00
00
0 0
00
o 00
0
o
N
0
N
o
o
o
r
o
o
N
NN
NN
0 0
NN
00
00
00
r r
00
00
NN
I
w
f
o
E
E
e
E
Cf
Cf
o
cr
o
o
I
e
o
0
r
o
o
00
o
0
o
E
Q
0
C1
l
0
E
0
II
c
oE
E
l
Cf
r
o
o
00
o
0
o
o
N
0
N
0
N
o
o
or
o
o
N
e
u
e
C1
Vl
c
a
c
U
o
I
N
o
o
00
0
M
M
w
o
Cf
o
Cf
E
Ul
u
e
w
ll
gz
f
Cf
o
o
M
o
M
Z
U
r
o
o
N
0
o
al
U
0
C1
l
o
E
0
C1
e
oE
E
l
Cf
r
o
o
N
0
o
o
o
r
0
N
o
o
o
r
o
o
N
o
U
c
C1
Vl
Vlj
c
e
j
c
U
o
I
N
o
N
00
r
M
1
M
Cf
Cf
e
Cf
E
o
I
N
Cf
Cf
w
w
t
f
N
I
o
crf
0
f
r
o
o
N
M
0
o
u
0
C1
0
E
0
C1
c
o
E
E
l
r
o
o
M
0
o
o
N
00
00
0
N
o
o
o
r
o
o
N
o
U
e
C1
Vl
Vlj
c
e
j
c
U
00
UU
e s
C1 C1
Vl Vl
Vl Vl
j jcc
e c
j j
c c
uu
o
I
N
o
00
I I
N N
00
0
I
M
M
r r
I I
N N
M M
M 1
cr
o
w
o
e
o
z
I
Cf
uu
e
f
w
Cf
Cf
o
Oll
o I
Wll
O
e
Mll
0
Ocr0u
e Cf
0
f O
of
M
o
00I
u
0
0
U
f 0
9
r
O
o
N
0
0
o
r r
00
00
0 0
0 0
00
u
0
C1
l
0
E
0C1
c
o
E
E
l
00
Vl VlIIII
r
o
o
N
0
0
o
r r00
00
N N
0 0
0 000
o 00
No
M
o
o
o
r
o
o
N
r r
N N
00
M M
00
00
00
r r
00
00
N N
o
U
e
II
Vl
Vlj
c
cj
c
U
o
on
N
o
W
o
Cf
Q
J
E
Ul
u
e
Ul
Q
gz
f
o
o
M
o
M
Z
0
r
o
o
o
N
0
o
E
U
0
II
0
E
0
II
c
o
E
E
l
Cf
r
o
o
N
o
N
0
o
o
0
o
r
o
1
o
o
o
r
o
o
N
323
0 f 0 00 000000 0 0
u u U uu uuuuuu u u
i c c c c c cc c c c c c c
Cl Cl Cl Cl Cl Cl Cl Cl Cl Cl ClCIlellellellellellellellellell
CIl ell ell ell ell
c c c c c cc cc cc c c
c c c c c c c c c c c c
c c c c c c c c c c c c c
U U U UU UUUUUU U u
jl 0 0 0 0 0 0 0 0 0 0 0 0 0
V V V V V V V V V V V V V
N N N N N N N N N N N N N
0 0 0 0 0 0 0 0 0 0 0 0 0
al V N N 0
0 V on 0
0 V on V
N N N
M M M M
M r M M
5 Ul iui Ul J OUl J 0 5 0VJl0l0EzwVJVJVJ
o 0 VJCJo VJCJ W
0 0 00 25 W 25 w 0 rVJVJVJrwCJ0CJrVJVJCJ0
w wo O VJo w l0VJ020000EC
r u C oi Eoi E r r
w rn E O E O E 0
t U Mo r Cr C t U
C 0 r w r w lEUlrEC
0 o r VJ r VJ IUIzzuwur0wCJwCJUlUt1ct1cCCVJC
CJ w w ZrrrCJroErw222ww2wroro0orUrU
0 0 N N 0 N N 0I0M000000 0 0
V 0 0 0 on 0 N N ON N V 0
CJ M 0 on U N N 0 M
Z C r 0 U U E
0 g gCC CUC0CCCc 0
J l l 0 l 22 22 l
l Q a a a a
0
LL 9 LLLL5LLLL 5
r r r r r r r r r r r r r
U 0 0 0 0 0 0000 0 0 0 0
0 0 0 0 0 0000 0 0 0 0
N I N N N IIIIII I N
Q N M M t t V V V V V V 00 00
a I I N N N N N N N II I Ia00000000000000000000000000
ij
U
0
Cl
S
0
i 0
Cl
0 0 0 0 0 0 0 0 0 0 0 0 C
Cl Cl 0
EellellellellellellellellellellellellClClClClClClClClClClQClE
lCCCCCCCCCCCCVJ
0
U r r r r r r r r r r r r r
a 0 0 0 0 0 0 0 00 0 0 0 0
0 0 0 0 0 0 0 0 00 0 0 0 0
I I N N I IN N N II I N
U
ll N M M t t on on V V V V 00 00
I I I IN N N IIIN I IU00000000000000000000000000
Q
1 0 0 0 0 0 0 0 0 0 0 0 0 0
00 0 M M M r r
0 N 0 tt tt t t N N
00 0 N N M M M M M M 0 r
0
M M M M M M M M M M M M M N
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0I0000000000O00rrrrrrrrrrrrr00000000000000000000000000 0
N N N N N N N N N N N N N
324
September CSO Highlights
105 Total Calls
The City of Chanhassen A growing community with clean lakes quality schools a chamning downtown thriving businesses winding trails and beautiful parks A great place to live work and play325
o1b
CHANHASSEN FIRE DEPARTMENT
P O Box 97 7610 Laredo Drive Chanhassen MN 55317
Bus Phone 952 227 1200 Minnewashta Station NO 2 Phone 952 474 7094
MEMORANDUM
TO Todd Gerhardt City Manager
FROM IGreggGeskeFireChiefiRogerSmallbeck1SIAssistantChief
Randy Wahl 2nd Assistant Chief
Mark Littfin Fire Marshal
DATE October 22 2007
SUBJ Monthly City Council Update
Fire Department Overview Staffing is at 45 active firefighters as of October 11 2007 allocation is
45 PTE s
As of October 7 2007 we had responded to 449 calls up 41 calls from 408 at the same time last year
We did not have any structure fires since our last council update Looks like the weather should be
acceptable for our open house again
Training This month s training consisted of Highway and Traffic Response Safety Training and our
physical ability testing
Fire Prevention Fire prevention weekmonth activities are going extremely well All four elementary
schools are either visiting us at the fire station or we are going to them There are also a number of day
care centers that we are visiting with a fire truck and firefighters When all is done we will have
presented our fire safety message to close to 3 000 pre schoolers kindergarten and elementary school
age children not to mention the estimated 600 to 700 people that will visit us at the open house On a
side note there are close to 35 Chanhassen firefighters who have taken time off their jobs used vacation
time to help at the station teaching and working with the kids These firefighters have to be
commended for their dedication to our community and our children The final preparations are being
made for the open house on Sunday October 14th from 1 to 4 p m Hope to see you there
Fire Investigations As a result of the above activities we have no fires to report on Our last
significant fire was on Mother s Day this last spring
326
Mr Todd Gerhardt
October 22 2007
Page 2
Fire Inspections Current projects at various stages of construction and inspections include Autobahn
Motorplex Lifetime Fitness Corporate Office Chanhassen High School Dell Professional Building
Mamac Properties a number of Town and Country town homes apartments condos Outset Inc
Southwest Transit and a number a smaller remodeling projects Existing inspections will begin after
fire prevention week activities are finished
a f
t
l fY
ng rrj V U f 1 jillWJlaAfit r
y
CHANHASS EN F1REDEPJ
327
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952227 1300
Fax 952 227 1310
Senior Center
Phone 952227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
8
MEMORANDUM
O
TO Paul Oehme Public Warks Director City Engineer
FROM Alyson Fauske Assistant City Engineer Xt
DATE October 22 2007
SUBJECT Vacation File 07 05 Vacation of Drainage and Utility Easements
Lots land 2 Block 2 Lake Lucy Ridge
BACKGROUND
Denali Homes has requested that Lots 1 and 2 Block 2 Lake Lucy Ridge be combined to
accommodate a proposed house driveway and pool In order to process the lot
combination the five foot wide drainage and utility easements along the common
property line of Lots land 2 must be vacated
Emerald Lane
Proposed
easement
vacation
1
I
I
1
I
1
I
I
I
I
I
I
I
I
I
I
J
I Lot 1
I
I Block 2
I
I
I
I
I
I
I
I 5 each side
I
L
Lot 2
Block 2
Gopher State One Locates show no evidence of any public or private utilities within the
proposed vacation area The existing utility boxes will lie within the existing easements
RECOMMENDATION
Staff recommends approval of the easement vacation contingent upon simultaneous
recording of the lot combination
Attachments
1 Application
2 Drawing and legal description of easement vacation
3 Notice of Public Hearing Affidavit of mailing location map
G ENGVacations 07 05 Denali Homes 1805 Emerald Lane 10 22 07 cc memo doc
The City of Chanhassen A growing community with clean lakes quality schools a channing downtown thriving businesses winding trails and beautiful parks A great place to live work and play328
jClca k Ot1
Plal lliI19 C e No
CITY OF CHANHASSEN
7700 Market Boulevard P O Box 147
Chanhassen MN 55317 952 227 1100 CITY OF CHANHASSEN
RECEIVED
DEVELOPMENT REVIEW APPLICATION SEP 2 1 2007
PLEASE PRINT
Iicant Name and Address
r t7Tf WA tQJC
c i 1
Pho e 76 tf7 96
Emall N A @ DW
CHANHASSEN PLANNING DEPT
Owner Name and Address
t5 c
Contact
Phone
Email
Fax
NOTE Consultation with City staff is reauired prior to submittal including review of developmentplans
Comprehensive Plan Amendment Temporary Sales Permit
L Vacation of Right of Way Easements 01Acf 3DOConditionalUsePermitCUP
Interim Use Permit IUP Variance VAR
Non conforming Use Permit Wetland Alteration Permit WAP
Planned Unit Development Zoning Appeal
Rezoning Zoning Ordinance Amendment
Sign Permits
Sign Plan Review
Notification Sign 200
City to install and remove
X for Filing Attorney Cost
UP SP ARlWAP Metes Bounds
450 Minor SUB ApflicAv td
r
00 jTOTALFEEJQDCt I c Sle
Site Plan Review SPR
Subdivision
An additional fee of 3 00 per address within the public hearing notification area will be invoiced to the applicantpriortothepublichearing
Sixteen 16 full size folded copies of the plans must be submitted including an 8 X 11
reduced copy for each plan sheet along with a diaital COpy in TIFF Group 4 tif format
Escrow will be required for other applications through the development contract
Building material samples must be submitted with site plan reviews
NOTE When multiple applications are processed the appropriate fee shall be charged for
each application
SCANNED
329
GAcL TO a
J D 5 e IM II L D
LEGAL DESCRIPTION L S J st 13 Lo l
r f W cJIU ef0 A
TOTAL ACREAGE 1 A CoilE CoMa UccL
WETLANDS PRESENT YES V NO
PRESENT ZONING t2e
REQUESTED ZONING
PROJECT NAME
LOCATION LArYu
e
PRESENT LAND USE DESIGNATION
REQUESTED LAND USE DESIGNATION
10 CoIU r tT 1k IIO E J l1
OlJ TIIE O CcM I d LT W t Jf
W lLPfE 5ertJ Ar JI 7rLE fAJ J1e 5JTE 70 rJk WE T
rU6 LeT Cewblo I 10 uJ lJ kL4f o M r
S de GWfrtr G I 5 e p I A 5 16
far 12w V1tl 0 t u ijj aed fIj
u l EThisapplicationmustbecompletedinfullandbetypewrittenorclearlyprintedandmustbeaccompaniedbyallinformation
and plans required by applicable City Ordinance provisions Before filing this application you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application
REASON FOR REQUEST
te1 id J a
A determination of completeness of the application shall be made within 15 business days of application submittal A written
notice of application deficiencies shall be mailed to the applicant within 15 business days of application
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application I have attached a copy of proof of ownership
either copy of Owner s Duplicate Certificate of Title Abstract of Title or purchase agreement or I am the authorized person
to make this application and the fee owner has also signed this application
I will keep myself informed of the deadlines for submission of material and the progress of this application I further
understand that additional fees may be charged for consulting fees feasibility studies etc with an estimate prior to anyauthorizationtoproceedwiththestudyThedocumentsandinformationIhavesubmittedaretrueandcorrecttothebestof
my knowledge
9 b o 7
Date
q 2o o7Date
G pLAN forms Development Review ApplicationDOC Rev 12 05
330
7iI1II01IJIJI
JNI
a
N
I
I
j
01
L
211 39
W2292oN9ffi9R
B1CisItoDJ0IIIIIHUiDlll4
o te v
i
u
I
I
I
l 1
i IfIUo
friJlIftIrt
t
tl jn
I
SA
00Q0t8 ES17500 0Y rZfT1or
t
II
i oY1i
i
c
iiJl j f 11 ii liHaJi
iljlll
l c 1 toF
1 1 PI j Zl 1 IrnlInfildlhltlfl1111JIdliJk0fef11111QlJ
I
Fi j1iJl
JIo
i
CIl
1
U
t t
toJ0
2
8
oo o S
0 0
a iiI
o
00
m7tzj
t
o8
Z t3
t
331
NOTICE OF PUBLIC HEARING
VACATION OF DRAINAGE UTILITY EASEMENTS
CITY OF CHANHASSEN
NOTICE IS HEREBY GIVEN that the Chanhassen City Council will hold a public
hearing on Monday October 22 2007 at 7 00 p m in the Council Chambers at Chanhassen City
Hall 7700 Market Boulevard The purpose of this hearing is to consider the request of David
BiekerDenali Custom Homes Inc for the vacation of drainage and utility easements at Lots 1
2 Block 2 Lake Lucy Ridge Vacation File No 07 05
A legal description and drawing of the proposed vacation area are available for public
review at City Hall during regular business hours
All interested persons are invited to attend this public hearing and express their opinions
with respect to this proposal
Alyson Fauske Assistant City Engineer
Phone 952 227 1164
Publish in the Chanhassen Villager on October 4 2007
SCANNED
g eng vacations 07 05 denali homes 1805 emerald lane ph notice to paper doc
332
e
CITY OF CHANHASSEN
AFFIDAVIT OF MAILING NOTICE
STATE OF MINNESOTA
ss
COUNTY OF CARVER
I Karen J Engelhardt being first duly sworn on oath deposes that she is and was on
October 4 2007 the duly qualified and acting Deputy Clerk of the City of Chanhassen
Minnesota that on said date she caused to be mailed a copy of the attached notice of Public
Hearing for Vacation of Lots 1 2 Block 2 Lake Lucy Ridge to the persons named on
attached Exhibit A by enclosing a copy of said notice in an envelope addressed to such owner
and depositing the envelopes addressed to all such owners in the United States mail with postage
fully prepaid thereon that the names and addresses of such owners were those appearing as such
by the records of the County Treasurer Carver County Minnesota and by other appropriate
records
Subscribed and s m to before me
thiAnday ofUCto 2007
C YY
N W
g engforms affidavitdoc
JEAN M STECKLlNG
Notary Public Minnesota
My Commission Expires Jan 31 2001
O NN
333
lie
Disclaimer
This map is neither alegally recorded map nor a survey and is not intended to be used as one
This map is acompilation of records information and data located in various city county state and
federal offices and other sources regarding the area shown and is to be used for reference
purposes only The City does not warrant that the Geographic Information System GIS Data used
to prepare this map are error free and the City does ot represent that the GIS Data can be used
for navigational tracking or any other purpose requiring exacting measurement of distance or
direction or precision in the depiction of geographic features If errors or discrepancies are found
please contact 952 227 1164 The preceding disclaimer is provided pursuant to Minnesota
Statutes 9466 03 Subd 21 2000 and the user of this map acknowledges that the City shall not
be iiable for any damages and expressly waives all claims and agrees to defend indemnify and
hold harmless the City from any and all claims brought by User its employees or agents orthird
parties which arise out of the use s access oruseof data provided
o
Disclaimer
This map is neither a legally recorded map nor asurvey and is not intended to be used as one
This map is acompilation of records information and data located in various city county state and
federal offices and other sources regarding the area shown and is to be used for reference
purposes only The City does not warrant that the Geographic Information System GIS Data used
to prepare this map are error free and the City does not represent that the GIS Data canbe used
for navigational tracking or any other purpose requiring exacting measurement of distance or
direction orprecision in the depiction of geographic features If errors ordiscrepancies are found
please contact 952 227 1164 The preceding disclaimer is provided pursuant to Minnesota
Statutes 9466 03 Subd 21 2000 and the user of this map acknowledges that the City shall not
be liable for any damages and expressly waives all claims and agrees to defend indemnify and
hold harmless the City from any and all claims brought by User its employees oragents or third
parties which arise out of the use s access oruse of data provided
334
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
4
MEMORANDUM
TO Todd Gerhardt City Manager
FROM Angie Auseth Planner I
DATE DOctober222007
SUBJ Scherle Variance Request 8541 Flamingo Drive
Lot 4 Block 1 Lake Susan Hills West 5th Addition
Planning Case 07 22
EXECUTIVE SU IMARY
The applicant is appealing the denial of their variance request for an after the fact 7 foot 3 inch
side yard setback for the addition of a shed
ACTION REQUIRED
City Council approval requires a majority of City Council present
PLANNING COMMISSION SUMMARY
The Planning Commission held a public hearing on October 2 2007 The Planning
Commission voted three for and one against the motion denying the setback variance
The Planning Commission discussed moving the shed to the rear yard behind the garage to
maintain the lO foot side yard setback and the drainage and utility easement They also
discussed the importance of the drainage and utility easement which is to allow storm water a
path to the storm sewer The Planning Commission was concerned that approval of the variance
could lead to a lack of separation between adjacent buildings By granting this variance a
precedent could be set to grant other properties setback variances and reduce or possibly
eliminate a drainage and utility easement and create a flooding situation
The Planning Commission suggested the applicant work with staff to come up with an
alternative location for the shed that meets city ordinances the applicant has decided to proceed
with the original setback variance request
The Planning Commission minutes for October 2 2007 are attached to this report
RECOMMENDATION
Staff and the Planning Commission recommend adoption of the motion as specified on page
6 in the staff report dated October 2 2007 denying the side yard setback variance with the
conditions outlined in the staff report and adopt the attached Findings of Fact
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play335
Todd Gerhardt
Scherle Variance
October 22 2007
Page 2
ATTACHMENTS
1 Letter from David and Julie Scherle Appealing Planning Commission Denial
2 Findings of Fact and Recommendation
3 Planning Commission Staff Report Dated October 2 2007
4 Planning Commission Minutes dated October 2 2007
g plan2007 planning cases 07 22 scherle variance executive summary doc
336
October 5 2007
Planning Commission
City of Chanhassen
7700 Market Boulevard
P O Box 147
Chanhassen 55317
Re Scherle Variance
Planning Case 07 22
Dear SirMadam
This is to notify you that we would like to appeal the decision made on our variance
request for a side yard setback on the construction ofa shed on our property at 8541
Flamingo Drive Lot 4 Block 1 Lake Susan Hills West 5th Addition
Thank you
T
David Scherle
CITY OF CHANHASSENRECEIVED
OCT 0 5 2007
CHANHASSEN PLANNING DEPT
CeAtH ED
337
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES MINNESOTA
FINDINGS OF FACT
AND ACTION
INRE Application of David and Julie Scherle for a 7 foot 3 inch side yard setback variance
for the addition of a shed Planning Case No 07 22
On October 22 2007 the Chanhassen City Council met at its regularly scheduled
meeting to consider the Appeal of David and Julie Scherle for 7 foot 3 inch side yard setback
variance for the addition of a shed at 8541 Flamingo Drive located in the Planned Unit
Development Residential District PUD R at Lot 4 Block 1 Lake Susan Hills West 5th Addition
which had been denied at the October 2 2007 Planning Commission meeting The City Council
reviewed the October 2 2007 Planning Commission minutes heard testimony from all interested
persons wishing to speak and now makes the following
FINDINGS OF FACT
1 The property is currently zoned Planned Unit Development Residential PUD R
2 The property is guided by the Land Use Plan for Residential Low Density Net Density
Range 1 2 4u Acre
3 The legal description of the property is Lot 4 Block 1 Lake Susan Hills West 5th Addition
4 The Board of Adjustments and Appeals shall not recommend and the City Council shall not
grant a variance unless they find the following facts
a The literal enforcement of the ordinance does not create a hardship since a reasonable use
of the property a single family home and a two car garage are constructed on the property
An alternate storage area could be constructed and comply with City Code
b The conditions upon which this variance is based are applicable to all properties in the
PUDR zoning district All properties within the Lake Susan Hills West development must
maintain a 10 foot side yard setback When the subdivision was platted in 1987 the
developer had to demonstrate that a 60 by 60 house pad could fit on each lot with in the
required setbacks
c The purpose of the variation is not directly based on the desire to increase the value or
income potential of the parcel of land
d The alleged hardship of encroaching into the side yard setback is a self created hardship
The desire for the proposed shed is based on the purchase of a motorcycle and indoor
storage An accessory building is allowed within the buildable area provided it meets the
1
338
zoning requirements The applicant has reasonable use of the property a single family
house and a two car garage as well as another shed in the rear yard of the property The
proposed variance is for convenience rather than necessity
e The variance may be detrimental to the public welfare or injurious to other land or
improvements in the neighborhood in which the parcel is located Since the shed crowds the
common property line to the North and reducing the required separation between buildings
f The proposed variation may impair an adequate supply of light and air to adjacent property
or substantially increase the congestion of the public streets due to the close proximity of
the structure to the property line
5 The planning report 07 22 Variance dated October 2 2007 prepared by Angie Auseth et aI
is incorporated herein
ACTION
The City Council denies Planning Case 07 22 for a 7 foot 3 inch side yard setback
variance from the required lO foot side yard setback for the construction of ashed on Lot 4 Block 1
Lake Susan Hills West 5th Addition based on the findings of fact in the staff report The City
Council further directs that
1 The applicant must move the shed and comply with the Zoning Ordinance
2 The applicant must re vegetate all removed hard surface areas with grass seed or sod
ADOPTED by the Chanhassen City Council on this 22nd day of October 2007
CHANHASSEN CITY COUNCIL
BY
Thomas A Furlong Mayor
g plan2007 planning cases 07 22 scherle variance cc findings of faCldoc
2
339
CC DATE 1022 07 2PCDATE10207
CITY OF CHANHASSEN REVIEW DEADLINE 10 29 07
CASE 07 22
BY AA
STAFF REPORT
PROPOSAL Request for an after the fact 7 foot 3 inch side yard setback variance from the 10
foot side yard setback requirement for the addition of a shed
Z LOCATION 8541 Flamingo Drive
U Lot 4 Block 1 Lake Susan Hills West 5th Addition
APPLICANT David and Julie Scherle
8541 Flamingo Drive
Chanhassen MN 55317
PRESENT ZONING Planned Unit Development Residential PUDR
2020 LAND USE PLAN Residential Low Density
ACREAGE 033 acres DENSITY NA
SUMMARY OF REQUEST The applicant is requesting a 2 foot 9 inch side yard setback for
the construction of a shed
Q Notice of this public hearing has been mailed to all property owners within 500 feet
5 LEVEL OF CITY DISCRETION IN DECISION MAKING The City s discretion in
00 approving or denying a variance is limited to whether or not the proposed project meets the
standards in the Zoning Ordinance for a variance The City has a relatively high level of
discretion with a variance because the applicant is seeking a deviation from established
standards This is a quasi judicial decision
340
Scherle Variance Request
Planning Case 07 22
October 2 2007
Page 2 of 6
PROPOSAL SUMMARY
The applicant is requesting a variance to allow a 2 foot 9 inch side yard setback The Zoning
Ordinance requires a lO foot side yard setback on all properties in the Lake Susan Hills
Subdivision The property is zoned Planned Unit Development Residential Single Family PUD
R It is located on Lot 4 Block 1 Lake Susan Hills West 5th Addition west of Powers Boulevard
The applicant received a Stop Work Order issued by a City building inspector as it was obvious
that the shed did not meet the lO foot side yard setback requirement The applicant came to City
Hall and inquired about the setback and then applied for a variance Upon inspection of the
property on September 6 2007 staff noticed that the amount of impervious surface on the property
clearly exceeded the hard surface coverage maximum allowed in that development Staff notified
the applicant of the impervious surface maximum requirement and the applicant worked with staff
to bring the impervious surface coverage into compliance
The applicant began construction of the shed because he purchased a larger motorcycle and no
longer had space in his two car garage to house it This is a self created hardship Staff is
recommending denial of the applicant s request based on the fact that the applicant has reasonable
use of the property Reasonable use is defined as a single family home with a two car garage
which is currently constructed on the property There are alternative locations for the shed One
alternative is to locate the shed behind the garage rather than on the side This would eliminate the
need for a variance
341
Scherle Variance Request
Planning Case 07 22
October 2 2007
Page 3 of 6
APPLICABLE REGULATIONS
Chapter 20 Division 3 Variances
Lake Susan Hills West PUD Development Contract
Section 20 506 b Standards and guidelines for single family detached residential PUD
Minimum lot size
Section 20 615 6 RSF District Requirements Setbacks
BACKGROUND
The property is located on Lot 4 Block 1 Lake Susan Hills West 5th Addition which is zoned
Planned Unit Development Residential PUD R The subject property has an area of 14 374 8
square feet It has a lot frontage of 69 feet and an average depth of 156 09 feet Minimum lot
dimensions required by ordinance are an average of 15 000 square foot lot size for the entire
PUD 90 foot lot frontage and 100 foot lot depth
Since discussion between staff and the homeowner began the applicant has reduced the
hardcover on the property to bring it into compliance with city code
ANALYSIS
The applicant is requesting a 7 foot 3 inch side yard setback variance from the lO foot side yard
setback requirement for the addition of a shed attached to the north side of his garage The shed
is 6 feet 3 inches by 20 feet 5 inches which would require a 3 foot 9 inch variance but the
eaves of the garage overhang 12 inches off the side of the shed
Eaves generally may encroach 2 feet 6 inches into a required setback when the structure meets
the 10 foot required setback However if a variance is requested then the allowed eave
encroachment no longer applies to the property The eave overhang must be part of the variance
request resulting in a setback of 2 feet 9 inches rather than 3 feet 9 inches
While the footprint and eaves of the shed extend 7 feet 3 inches into the setback the shed has a
net floor area less than 120 square feet Therefore the structure does not have to meet building
code requirements and does not require a building permit However all improvements must
meet zoning regulations such as setback requirements drainage and utility easement
encroachment and hard surface coverage requirements The applicant constructed the shed
without contacting the City or the City s website and received a Stop Work Order from one of
the City s building inspectors
A Residential Zoning Permit acts as a safety net to identify prior to construction any potential
code violations including but not limited to setbacks and hard surface coverage requirements
This permit is at no cost to the homeowner and allows the City and the homeowner an
opportunity to correct any encroachments or violation before installation begins It is the
contractor homeowner s responsibility to contact the City prior to construction and obtain a
Residential Zoning Permit to ensure compliance with City Code
342
Scherle Variance Request
Planning Case 07 22
October 2 2007
Page 4 of 6
Staff called Gopher State for a locate to determine whether any public utilities were in the
drainage and utility easement none were identified in that easement
Site Characteristics
The applicant currently has a shed in the rear yard as well as a two car garage which could house
the motorcycle There are not topographical or pre existing characteristics on the site that would
constitute undue hardship or the need for a variance
The homeowner has worked diligently to remove much of the hard cover on the property to
comply with the impervious surface requirement an accessory driveway concrete behind
proposed shed shed behind garage retaining wall along removed driveway and retaining wall
around garden
Permitted Use
The site is zoned PUD R Planned Unit Development Residential The Lake Susan Hills West
PUD development contract approved November 19 1987 states that Single family lots shall be
developed in accordance with the uses standards and requirements of the RSF Single Family
Residential Zoning District Reasonable use of a property within the RSF district is a single
family home with a two car garage which is currently constructed on the property
An accessory structure to store vehicles is not considered to be a necessity Accessory structures
are permitted provided they meet the zoning requirements for that lotdevelopment A shed
could be built behind the garage However the applicant would have to remove more
impervious surface to allow for this addition The shed for which the variance has been applied
for is currently on a concrete slab which could be removed allowing the necessary square
footage for a separate shed addition
V ARIANCES WITHIN 500 FEET
There are no variance requests for properties within 500 feet of the subject property There were
four variance requests within the Lake Susan Hills West Subdivision located on the west side of
Powers Boulevard
CASE ADDRESS REQUEST DECISION CONDITION
98 10 1520 Heron Drive 28 foot front yard setback for a Approved
pool 2 Variance screen bottom of pool
22 foot rear yard setback for Approved
99 05 845 I Pelican Court three season porch on existing demonstrate existing deck can support
deck 8 Variance porch without structural changes
02 01 1420 Heron Drive 23 foot front yard setback for a Approved
third garage stall 7 Variance No Conditions
Approved
36 7 Hard Surface Coverage 1 Work with city forester for additional
03 06 8632 Flamingo Drive trees and or shrubsforaccessorystructures2nofutureconversionother than to
green space
343
Scherle Variance Request
Planning Case 07 22
October 2 2007
Page 5 of 6
Should the Planning Commission City Council approve a variance the following issues must be
addressed the applicant must get an encroachment agreement to be within the drainage and
utility easement and the applicant must re vegetate all removed hard surface areas with grass
seed or sod This could set a precedent within the neighborhood and findings of fact would need
to be created to support the approval
FINDINGS
The Planning Commission City Council shall not grant a variance unless they find the following
facts
a That the literal enforcement of this chapter would cause an undue hardship Undue hardship
means that the property cannot be put to reasonable use because of its size physical
surroundings shape or topography Reasonable use includes a use made by a majority of
comparable property within 500 feet of it The intent of this provision is not to allow a
proliferation of variances but to recognize that there are pre existing standards in this
neighborhood Variances that blend with these pre existing standards without departing
downward from them meet these criteria
Finding The literal enforcement of the ordinance does not create a hardship since a
reasonable use of the property a single family home and a two car garage are constructed
on the property An alternate storage area could be constructed and comply with City Code
b The conditions upon which a petition for a variance is based are not applicable generally to
other property within the same zoning classification
Finding The conditions upon which this variance is based are applicable to all properties
in the PUD R zoning district All properties within the Lake Susan Hills West development
must maintain a 1O foot side yard setback When the subdivision was platted in 1987 the
developer had to demonstrate that a 60 by 60 house pad could fit on each lot within the
required setbacks
c The purpose of the variation is not based upon a desire to increase the value or income
potential of the parcel of land
Finding The purpose of the variation is not directly based on the desire to increase the
value or income potential of the parcel of land
d The alleged difficulty or hardship is not a self created hardship
Finding The alleged hardship of encroaching into the side yard setback is a self created
hardship The desire for the proposed shed is based on the purchase of a motorcycle and
indoor storage An accessory building is allowed within the buildable area provided it meets
the zoning requirements The applicant has reasonable use of the property a single family
house and a two car garage as well as another shed in the rear yard of the property The
proposed variance is for convenience rather than necessity
344
Scherle Variance Request
Planning Case 07 22
October 2 2007
Page 6 of 6
e The granting of the variance will not be detrimental to the public welfare or injurious to
other land or improvements in the neighborhood in which the parcel is located
Finding The variance may be detrimental to the public welfare or injurious to other land or
improvements in the neighborhood in which the parcel is located The shed crowds the
common property line to the North reducing the required separation between buildings
f The proposed variation will not impair an adequate supply of light and air to adjacent
property or substantially increase the congestion of the public streets or increase the danger
of fire or endanger the public safety or substantially diminish or impair property values
within the neighborhood
Finding The proposed variation may impair an adequate supply of light and air to adjacent
property or substantially increase the congestion of the public streets due to the close
proximity of the structure to the property line
RECOMMENDATION
Staff recommends that the Planning Commission City Council adopt the following motion
The Planning Commission City Council denies Planning Case 07 22 for a 7 foot 3 inch side yard
setback variance from the required lO foot side yard setback for the construction of a shed on Lot 4
Block 1 Lake Susan Hills West 5th Addition based on the findings of fact in the staff report The
Planning Commission City Council further directs that
1 The applicant must move the shed and comply with the Zoning Ordinance
2 The applicant must re vegetate all removed hard surface areas with grass seed or sod
ATTACHMENTS
1 Findings of Fact and Recommendation
2 Development Review Application
3 Reduced copy of lot survey
4 Public Hearing Notice and Affidavit of Mailing
5 Letter of Appeal
g plan2007 planning cases 07 22 scherle variance cc flamingo var report doc
345
CHANHASSEN PLANNING COMMISSION
REGULAR MEETING
OCTOBER 2 2007
Chairman McDonald called the meeting to order at 7 00 p m
MEMBERS PRESENT Mark Undestad Dan Keefe Kathleen Thomas and Jerry McDonald
MEMBERS ABSENT Debbie Larson Kurt Papke and Kevin Dillon
STAFF PRESENT Kate Aanenson Community Development Director Bob Generous Senior
Planner Jill Sinclair Environmental Resource Specialist Todd Hoffman Park and Rec Director
and Krista Torgerson Natural Resources Technician
PUBLIC PRESENT FOR ALL ITEMS
Jerry Janet Paulsen
Debbie Lloyd
7305 Laredo Drive
7302 Laredo Drive
PUBLIC HEARING
SCHERLE VARIANCE REQUEST FOR AN AFTER THE FACT VARIANCE TO A
SIDE YARD SETBACK TO CONSTRUCT A GARAGE ADDITION ON PROPERTY
ZONED PLANNED UNIT DEVELOPMENT RESIDENTIAL PUD R LOCATED AT
8541 FLAMINGO DRIVE APPLICANT DAVID JULIE SCHERLE PLANNING
CASE NO 07 22
Public Present
Name Address
David Julie Scherle
Daniel Tan
Robert Whims
8541 Flamingo Drive
8551 Flamingo Drive
8556 Flamingo Drive
Bob Generous presented the staff report on this item
McDonald Mark any questions
Undestad Just one on the driveway You said there was a hard surface issue and now that s
been with the shed square footage and everything else is okay on there
Generous Right They removed the excess There used to be an expansion on the driveway
that was in there There s some retaining walls and some other things that the property owner
removed in the interim since when they were first notified that that was an issue and the present
time
346
Planning Commission Meeting October 2 2007
Undestad The square footage of the shed area is that can stay That square footage is okay
Generous I believe that was included in I don t know I had it Yes the shed was included in
that And it would comply
Undestad Okay
McDonald Okay
Thomas Yeah okay Of the things that they removed in the interim does that also include the
shed that s in the back or is that
Generous No that s still
Thomas That s still there on the property And then I saw in the paper where it said the city we
maybe could put it on the back side of the garage I believe is what I was reading Is that really a
viable space or
Generous Not if you look at it not immediately behind the garage
Thomas Okay
Generous Unfortunately the survey doesn t show all the improvements on the property It s
from the original building permit application and so if you look at the picture you can see there s
a deck behind there
Thomas Okay
Generous But there is room in the rear yard that a structure could be incorporated
Thomas Could be incorporated in back Okay That was my question Thank you
McDonald Dan
Keefe The this is a PUD Is the setback in the rear 5 feet like it is in RSF Just out of
curiosity Is it 5 in the back for accessory structures and then 10 on the sides and that s for RSF
right And that s what was applied in this particular PUD
Generous Yes
Keefe It is So its consistent with the
Generous With the RSF
Keefe With the RSF Alright so we don t have a conflict there Okay That s all I have
2
347
Planning Commission Meeting October 2 2007
McDonald I don t have any questions at this time for staff Is there someone here to present the
applicant Would you step up to the podi urn and state your name and address and just address
the commissioners and tell us your side of all this
Dave Scherle My name s Dave Scherle 8541 Flamingo Drive We think the location of the
shed is the best place for it and we re hoping to get the variance to keep it there Angie the
planner she was suggesting we put it behind the garage where it would fit there but to drive our
motorcycle back in that location we d have to go over grass and we can t it just the motorcycle
weighs over 800 pounds and it it d be too much too dangerous You d have to drive over grass
or dirt and you could damage the motorcycle or injure the rider and the shed itself will have the
same siding as the house has and the roof will have the same kind of shingles as the house has
and the soffits and the eaves will have the same color as the house too so it should fit right in
with the house but it won t be part of the garage It will be right next to the garage It won t be
actually you know connected But it s right next to the to the garage We d have to remove the
sidewalk that the shed is on right now to meet the requirements of the hard cover so that s why
we d have to be driving on grass to get the motorcycle back there So that s the main reason why
we need it where it s at right now That s it
McDonald Okay Mark
Undestad Yeah just one well actually a couple questions here The foundation is it a below
grade foundation or is it just the sidewalk and you re building
Dave Scherle Just the sidewalk Kind of a floating slab
Undestad Okay So it will move in the wintertime when
Dave Scherle Yeah There could be some movement with it yeah
Undestad And looking at how this sits on there I realize where you re at in the stages right now
when it s out there Did you look and see can it be just pushed back along the garage a little
more to get it out of that easement area
Dave Scherle Well I looked at that and I there isn t you know I was actually thinking about
doing that because I was going to try getting some rollers underneath to move it back farther but
it would still be in that easement Otherwise yeah that is a really good idea Yeah there is it
still would be in the easement
Undestad And that sidewalk then that you ve got already poured in there you can maneuver
your motorcycle around the front of the garage to get into that
Dave Scherle It will be a little tight but I think Ill be able to do it
McDonald Okay
3
348
Planning Commission Meeting October 2 2007
Dave Scherle Might have to put in a you know I m a little I ve got probably a little bit of play
with the hard cover where I could put in some concrete blocks in that comer to help make it a
little bit easier
Undestad It looked a little tight for that
Dave Scherle Yeah Yeah it is pretty tight so that I might have to do that but there is some
easement I ve got I don t know how many feet but Ive got a few square feet I could just get that
in there Because I would like to make it easy as I could to get in and out
Undestad How far back if you could move it back do you know did anybody how far back
would it have to go before it s outside of the easement area Do you know
Dave Scherle I m not sure
Undestad 15 20 feet
Aanenson I d say about 20 yeah
Generous Probably a little bit farther
Dave Scherle Because the long property line is not too far from the retaining wall so but it
does you know it does have a few feet but you know for that kind of feet you d have to go back
probably by the oh the deck back there I think probably to get to that far
Undestad Would it have to be that big for the motorcycle
Dave Scherle Does what
Undestad Does it have to be that big
Dave Scherle No it doesn t have to be quite that big but you d still would have to move it so far
back I don t know lets see the motorcycle s 103 inches long I think It s pretty long But yeah
it wouldn t have to be quite that big You could make it smaller but if that s what it would take to
get it we could do that too I mean its able to take it down and move it I mean if we have to
we ll take it down and that s all that s to it too If we don t get the variance so
Undestad That s all for me
McDonald Kathleen
Thomas So I want to know what kind of bike it is
Dave Scherle It s a Gold Wing
Thomas Gold Wing
4
349
Planning Commission Meeting October 2 2007
Dave Scherle Yeah
Thomas Okay We have a motorcycle too and I so I was just curious Then are you is it going
to be heated Is it just going to be like a garage
Dave Scherle Just a garage
Thomas Just like a garage
Dave Scherle Yeah Not heated
Thomas Not heated You ll have to go start it and okay Alright I m good
Keefe Just to probably state the obvious were you aware that a permit was required for doing
that
Dave Scherle I didn t think for 120 feet or less you needed a permit for it That was what I have
heard before and I thought that was the case for this
Keefe Okay that s it
McDonald Okay Where do you currently store your motorcycle
Keefe It s in the garage with some lumber and stuff right now and the car is outside right now
McDonald Okay And how long have you been doing that Is it just kind of a seasonal thing in
the winter you ll put the motorcycle away
Keefe Well right now see our old motorcycle that we owned before we just got this July I
could fit in the garage and it was okay Plus it was easier It was a smaller motorcycle I could
drive it on the grass and get it to the back shed to store But in the summer I could yeah or
summer I could get it off the side so I could get the car in and out and then my back was
bothering me with that motorcycle so we bought this other motorcycle to you know help out on
the back and it really has because there s not much vibration on a Gold Wing
McDonald Okay And then on the shed itself how wide does it really need to be because it
looks as though could you narrow things up Bring it in closer to the garage
Keefe See it s really pushing it for even a 4 I ve got like a 4 12 foot garage door that I can just
get in there That s the best I could and let s see what is it 3 12 feet wide I think from mirror to
mirror so there s not a lot even with that 4 12 foot garage door for you know you have a little
bit on each side but you want something on each side of the motorcycle to get in there so you
don t hit Hit the door
5
350
Planning Commission Meeting October 2 2007
McDonald Okay And the retaining wall that s shown in that photograph is that something that
was built as a part of putting the shed up or was that already existing
Dave Scherle That was already existing and the only thing that s left of that is the retaining wall
the length of the shed It s been removed in front of it Well it actually goes a little bit in front of
the shed It goes probably approximately 3 or 4 feet I can t remember exactly There s an
apron It comes out to that Actually it shows on the picture here That it comes out The
retaining wall comes out to there So yeah so the retaining wall starts there and goes all the way
to the back of the shed right now The rest has been removed because of the hard cover
McDonald Okay And okay currently you ve got a patio on the back side so that s why you re
saying that the shed actually couldn tbe moved around to the back then
Dave Scherle Well if we did move it around to the back you d have a hard time getting the
motorcycle to it because I d have to be going on grass with it and you should really be on hard
surface to be moving that motorcycle around Because it could easily you could easily dump it
I haven t dumped it yet and I hope I never do It s a lot of weight to pick up
McDonald 800 pounds that s going to be kind of hard
Dave Scherle Yeah
McDonald Well I guess I don t have any more questions at this point
Undestad Just one more
Dave Scherle Okay sure
Undestad The shed is the primary use is it for the winter storage of the bike or is it just for all
time
Dave Scherle It will be all the time is what we were planning on using it for
McDonald Okay Well we thank you for coming up and addressing us then
Dave Scherle Thank you
McDonald Okay At this time then I would open up the floor for public comment on this issue
and if anyone wanted to come up and make comment please do so When you get to the
podium if you will state your name and address and address your comments to the commission
Robert Whims Hi I m Robert Whims I live right across the street from Dave 8556 Flamingo
Drive and Ijust wanted to say the garage it looks good so I hope you give it to him
McDonald Okay thank you
6
351
Planning Commission Meeting October 2 2007
Daniel Tan I m Daniel Tan 8551 Flamingo Drive Just a neighbor to the side You know
aesthetically the garage looks good and I think you guys I think I think you guys should let it
be there Thank you
McDonald Okay thank you Does anyone else wish to come up before the commission Okay
well at that point then I guess I will close the public meeting portion of this and I ll bring it back
up for the commissioners for open discussion then Why don t we start down here with Dan
Keefe Yeah I ve got just sort of two thoughts on it One is you know if we allow this to go in
on this side and then say the next door neighbor or you know that s adjacent to him you know
decides they want to do that and because it s on this we sort of maybe are obligated to do that
Then you end up with a pretty small space inbetween the houses Do we end up with a potential
you know issue with fire and being able to get emergency vehicles or so far you know I think
in part the purpose for the setbacks is to allow you know space for space between the houses
both for maybe emergency vehicles and then also just for aesthetic reasons so kind of tom on
that issue I don t know if you guys have any thoughts on that The side setbacks
McDonald That s kind of what I m kind of tom between too Those things are put in there for
the reason that you state It s very I mean we face this same problem just about everything that
comes before us You know developers come in sell us on a house It meets the setbacks and
they go right to the limit and then we end up with the homeowner trying to do something and we
tell them they can t But the setbacks are there for a reason and you know we are very consistent
with that so yeah I understand I m kind of torn on this myself Kathleen
Thomas I m the same issue I can totally understand setbacks if we grant them like this it
creates like a slippery slope of who else will want the same type of thing but I understand what
the gentleman is saying about the shed It being it s really I m quite tom just because I see it
both sides so
McDonald Mark
Undestad Well you know primarily it s drainage in there too Everything goes from the back of
that lot out to the street to the front of that lot You know if we start pushing those setbacks and
drainage in there you know you ve got a happy now I m sure he wants to keep him that way too
instead of flooding out his basement in there when the heavy rains come in but again nobody
likes to see something that s already built and have to start moving things around but you know
that s again that s why we have the setbacks and the easements and basically the no build
McDonald Yeah I guess the thing Im kind of tom between is that you know emotionally you re
probably one of the nicer guys to come up before us and ask for this Most everybody else is
very much in our face about why we ought to do this The setbacks are there for a reason The
drainage is very important We have a lot of problems within the city as far as drainage Every
time a developer comes in that s part of the design process that we go through with the
developer to say you ve got to do this as far as drainage and they put this stuff in What you re
asking us to do is similar to two other applications that came in before us and I know that in one
case we asked a guy to take out a gazebo because he was on easement and drainage and it was
7
352
Planning Commission Meeting October 2 2007
just going to create a big problem It was a beautiful structure He had a lot more money into it
by the time he got to us than you know what you ve got at this point but we have to enforce the
rules and they re there for a reason One thing staff does we study these things very hard to give
homeowners maximum use of their property without interfering with the rights of others I
understand and again we all feel kind of your pain about this Yeah 800 pound motorcycle
you ve got to put it someplace Gold Wing s a beautiful bike and everything but the problem that
we run into is that we can t base decisions based upon that Ijust don tbelieve we can do that or
anyone can come in here and again give us a good story and reasons why we ve had to turn
down people because of physical handicaps and everything and that s the hard part about this job
but I guess you know my leaning is yeah I would feel for you and everything You ve got a
good reason I guess for building the shed to begin with I appreciate your civility about coming
up here and the way you ve approached this and stuff but I m probably going to have to lean on
the side of where the rules are at I guess
Undestad Can I add one thing though Again I mean you can go to the council on that but
these types of structures too when they re built without foundations on there and again being in
the area that it s in with the drainage and that there s potential for a lot of movement You know
hinging off your house You can be kind of faced with problems quite a while as that thing
constantly goes up and down You know it will pull away from your house Go back to your
house Kind of the reasons too why you know a lot of the stuff sheds like this should be put on
something a little more stable foundation wise
McDonald Any further comments Then I guess at this time we re ready to accept a
recommendation Who d like to
Undestad I ll get it here Recommend the Planning Commission denies Planning Case 07 22
for a 7 foot 3 inch side yard setback variance from the required 10 foot side yard setback for the
construction of a shed on Lot 4 Block 1 Lake Susan Hills West 5th Addition based on the
Findings of Fact in the staff report The Planning Commission further directs that number 1 the
applicant must move the shed Comply with zoning ordinance And the applicant must
revegetate all removed hard surface as with grass seed or sod
Keefe Second
McDonald Okay
Undestad moved Keefe seconded that the Planning Commission denies Planning Case 07
22 for a 7 foot 3 inch side yard setback variance from the required 10 foot side yard
setback for the construction of a shed on Lot 4 Block 1 Lake Susan Hills West 5th
Addition based on the Findings of Fact in the staff report The Planning Commission
further directs that
1 The applicant must move the shed and comply with the Zoning Ordinance
2 The applicant must re vegetate all removed hard surface areas with grass seed or sod
8
353
Planning Commission Meeting October 2 2007
All voted in favor except Thomas who opposed and the motion carried with a vote of 3 to
1
McDonald Okay motion passes 3 to 1 What I would suggest is you talk with the city staff on
this You have a right to appeal this up to the City Council The minutes of this particular
hearing will go into the packet for the City Council You may be able to reach a compromise
with staff that would work within the ordinance and everything and still accommodate what you
want I think you ll find them very accommodating and try to help give you some you know
good ideas as to what to do
COMPREHENSIVE PLAN PARKS OPEN SPACE NATURAL RESOURCES
ELEMENTS
Public Present
Name Address
Tim Erhart
Glenn Stolar
9611 Meadowlark Lane
Park and Rec Commission
Kate Aanenson Thank you Mr Chair members of the Planning Commission As you know
the last year we spent a lot of time going through the evolution of the comprehensive plan which
I m happy to announce is out and out for press It did go out last Friday for jurisdictional review
It is required for 6 month open hearing date so that time is starting right now I also wanted to
let you know you do have a hard copy the entire hard copy in front of you Just for everybody
else for their knowledge and information the entire comprehensive plan draft is on the city s
web site so if anybody s interested in reading a particular chapter I hope you read all the
chapters they can go online and do that The goal of the public hearing process to get input from
our residents to see if we re moving in the right direction and address their concerns Not only
our residents but the jurisdictions that it goes out to includes the school districts the watershed
districts DNR just to name a few So we re hoping to get positive input or informative input
that we can respond to as we move forward in the process So as we set up this process we re
going to take a couple chapters at a time for you to hold the public hearing and to gather that
input and at the end of that process as we break it down we ll move into January where we
respond in writing to the comments that are received and the staff that it s more appropriately
addressed to will also respond so actually you ll have that collection of responses So whether it
goes to engineering or parks and rec or planning we ll respond to those comments and you can
see what those are Then ultimately your comments will be forwarded up to the City Council for
their review and then after we have the 6 month jurisdiction review it goes up to the Met
Council who gets another 60 days to review So we re looking probably in sometime the first
part of July for final adoption So I just wanted everybody to know there s plenty of time to get
comments into the city If you want to call and speak to the person that would be most
appropriate to talk to whether it s engineering city forester the planning department to talk to
and get your questions answered We hope people take the time to review that So for tonight
the first two chapters that we ll be looking at will be the natural resources which includes
forestry natural resources and water resources and then park and rec The Environmental
9
354
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
WNW ci chanhassen mn us
s
MEMORANDUM
TO Todd Gerhardt City Manager
FROM fe
Paul Oehme Director of Public Works City Engineer
DATE October 22 2007
SUBJ Discussion of Kurvers Point Speed Limit PW070C
DISCUSSION
Several property owners in the Kurvers Point neighborhood have requested the
City lower the speed limit in their neighborhood to 20 mph Kurvers Point is a
cul de sac street with 32 homes accessing the street west of Willow View Cove
A long sweeping bend on a down grade is present at the entrance to the
neighborhood after Willow View Cove The property owners are concerned
about a speeder in the neighborhood and potential pedestrian vehicle conflicts
The neighborhood does not have a sidewalk
Currently the street is the required 30 mph speed limit per Minnesota State Statue
169 14 Staff discussed with the neighborhood representatives the Project Lead
Foot program Also staff set out the speed trailer for two days and took traffic
counts with the Engineering department s traffic counters to obtain traffic
statistics The traffic information gathered indicatedthat 85 of the traffic is
traveling 23 mph or less One vehicle was recorded going between 31 35 mph by
the traffic counters The average daily trips for the neighborhood were 260
vehicles which is what would be expected for this type of neighborhood Based
on this information staff is not recommending the speed limit be lowered to 20
mph Staff has put up a curve advisory sign at the firstcurve into the
neighborhood with 20 mph advisory speed signs Staff also discussed removal of
the 30 mph sign at the entrance of the neighborhood with Sergeant Peter
Anderley Based on enforcement action that can be done in the neighborhood he
did not object to removal of the 30 mph sign The street will still havea speed
limit of 30 mph with or without the speed limit sign The speed limit sign has
been removed
No action is necessary by the Council unless the decision is made to lower the
speed limit
Attachments
The City of Chanhassen A growin llR I1 leM g t9 l1k wiBg downtown thriving businesses winding trails and beautiful parks A great place to live work and play355
PATROL DIVISION
CHANHASSEN STATION
Memo
To Paul Oehme
Sergeant Peter AnderleyFrom
Date 10 03 2007
Re Kurvers Point Rd
In reference to the speed limit evaluation on Kurvers Point Rd The current speed of
30m ph was asked to be evaluated by the citizens that live in the neighborhood After
placing the speed trailer and monitoring traffic it was determined the average speed
on Kurvers Point Rd is much slower then the posted 30mph already While the
speed trailer was out it captured 2 vehicles between 25 29mph and no vehicles over
30m ph in 8 hours of monitoring It appears the traffic is traveling at a reasonable
speed for a residential neighborhood Speed enforcement action is virtually non
existent and difficult do to the slow speeds indicated for the posted 30mph zone
cc memo book
Page 1
356
0
co
en
cp
t
00
Q
Lotus
Lake
i
357
SPEED
LIMIT
9
What are the Legal Speed Limits
t MN Statute 169 14
Speed laws are created for the protection of
bthe pu lic and the curbing of unreasonable
ehavlOr To effectively enforce a law the
public must believe that the law is
reasonable Minnesota s speed regulations are based on the
same Basic Speed Law that is used in all 50 states No
person shall drive a vehicle on a highway at a speed greater
than IS reasonable and prudent under the conditions
Statutory limits are based on the concept that uniform
cate ories of highways can operate safely at certain preset
a ll um speeds under ideal conditions Whether the speed
lImit IS posted or unposted drivers are required to reduce
speed below these values for poor weather conditions curves
or hills and potential hazards such as pedestrians D ivers
must also reduce speed when approaching or passing
emergency vehicles with emergency lights flashing
These are the most common statutory speeds
J 10 mph in alleys
J 30 mph on streets in urban districts
J 70 mph on rural interstate highways
J 65 mph on urban interstate highways
J 65 mph on expressways
J 55 mph on other roads
Whenever these statutory speed limits are not the correct
value for a specific highway the commissioner of
transpo rtation authorizes the posting of other regulatory
speed lImits
Interstates are high design multi lane divided highways
that have controlled access interchanges such as cloverleafs
or diamond shaped interchanges Through traffic on the
Interstate never has to stop or yield Examples 1 94 or 1 35
Expressways are multi lane divided highways but they
have e tnes and Inter ectlons sometimes controlled by
traffic signals Some Interchanges may exist but they are
not the rule Examples Highway 0 or Highway 52
How Does MnlDOT
Determine the Regulatory Speed Limit
1 h commissioner of transportation sets regulatory speed
lImIts on state and local roads based on a thorough
engineering and traffic investigation
These factors are considered
J road type and condition
J location and type of access points intersections
entrances etc
J sufficient length of roadway 1 4 mile minimum
J existing traffic control devices signs signals etc
J crash history
J traffic volume
J sight distances curve hill etc
J test drive results
J speed study
The most important part of the traffic investigation is the
speed study When choosing a speed drivers take many
roadway environment factors into consideration Therefore
the speed that the majority of people consider prudent is an
important value Data is collected by performing radar
checks at selected locations on the roadway under ideal
driving conditions A technical analysis is done on the results
to determine the 85th percentile This is the value indicating
the speed at which most 85 drivers are traveling under
Experience has shown that a posted speed limit near this
value is the maximum safe and reasonable speed Studies
have shown that traveling much faster or slower than this
value can increase your chance of being in a crash
Engineering judgement is an important tool The traffic
investigator must use knowledge of nationally accepted
principles combined with experience to assign the safe speed
tlNESO
c
l 111 August 2002
2 Minnesota Department of Transportation
l i Office of Traffic Engineering
1 if Intelligent Transportation Systems
r OF Tf
O
Mm Mi
www dotstate mn us trafficeng
J
358
What are the Types of Speed Limits
REGULATORY SPEED LIMIT SIGN
SPEED
LIMIT
50
This black and white sign shows the maximum speed
that a motorist may travel under ideal conditions It
can be a statutory value or else it must be authorized
by the commissioner of transportation
ADVISORY SPEED SIGN
This black and yellow speed sign is used to advise
motorists of a comfortable speed to navigate certain
situations It is used with a warning sign For
instance when traveling on a winding road the curve
waming sign would be used with an advisory speed
sign This sign may be posted by the local road
authority on local roads
SPEED LIMITS IN SCHOOL ZONES
SPEED
LIMIT
20
I I
Local authorities may establish school speed limits on
local streets within a school zone upon the basis of
an engineering and traffic investigation as prescribed
by the commissioner of transportation This
regulatory speed limit is in effect whenever children
are present such as before and after school or during
recess The school plate is black and yellow and the
other signs are black and white Optional flourescent
yellow green may be used for the school plate
SPEED LIMITS IN WORK ZONES
SPEED
LIMIT
40
SPEED
LIMIT
50
Advisory speed limits are used to identify safe speeds
for specific conditions within a work zone These
black and orange signs are always used with warning
signs The local road authority can post these plates in
work zones on local roads
Work zone speed limits are short term regulatory
speed limits that are established for worker safety due
to traffic in adjacent lanes These speed limits range
from 20 mph to 40 mph on two lane two way roads
and up to 55 mph on divided highways They can be
posted by the local road authority in active work zones
on local roads The FINES DOUBLE plate is black
and orange and the speed limit sign is black and white
Temporary speed limits in construction zones are
sometimes needed for long term construction projects
or detour routes These regulatory black and white
signs are used when a reduced speed is needed for
driver safety Valid 24 hours a day 7 days a week
these must be authorized by the commissioner of
transportation for any roadway
See the website www dot state mn us speed
r more information on Work Zone Speed Guidelines
Questions Answers
Will lowering the speed limit reduce speeds
NO Studies show that there is little change in the speed pattem
after the posting of a speed limit The driver is much more
influenced by the roadway conditions
Will lowering the speed limit reduce crash frequency
NO Although lowering the speed limit is often seen as a
cure all in preventing crashes this is not the case Crashes are
most often the result of driver inattention and driver error
However if a posted speed limit is unrealistically low it creates a
greater speed variance i e some drivers follow the speed limit
while most drive the reasonable speed This speed variance can
contribute to crashes
Why do we even have speed limits
A uniform speed of vehicles in a traffic flow results in the
safest operation The posted speed limits can keep the traffic
flowing smoothly provided the majority of drivers find the
speed limits reasonable To best do this the limits must be
consistent throughout the state The speed limits also give the
motorist an idea of a reasonable speed to drive in an unfamiliar
location The speed limits are used by police officials to
identify excessive speeds and curb unreasonable behavior
Who Do I Contact
If you believe that there is a safety concern or an inappropriate
speed limit posted the person to contact depends on the type of
road
TRUNK HIGHWAYS
For regulatory and advisory speed limits on the trunk highway
system you may contact the district traffic engineer at your
Mn DOT district office
The trunk highway system includes
CJ Interstate Highways
o U S Highways and
D Minnesota State Highways
LOCAL STREETS AND HIGHWAYS
For these roadways you may contact your local road authority
county city or township For advisory speed limits The
local road authority can determine these advisory speeds and
post the plates without authorization from the commissioner of
transportation For regulatory speed limits The local road
authority can pass a resolution requesting an investigation by
MnDOT Based upon the results MnDOT may then
authorize the local road authority to post new speed limits
The phone numbers to call for state or local assistance can be
found in the phone book under government listings If you are
unable to find the proper phone number you may call the
MnDOT Information Center at the following numbers
1 800 657 3774 Greater Minnesota or
651 296 3000 Twin Cities Metro Area
8 J DOUBLE FINES will be imposed for violating any regulatory speed limits in work zones or
Sa rety in school zones Fines are also double for failing to reduce speed when passing by a stopped
emergency vehicle with its lights flashing
Notes J When an EMERGENCY VEHICLE is approaching you move to the closest shoulder
without crossing the path of the approaching emergency vehicle You may proceed when the
emergency vehicle passes you If you are approaching a stopped emergency vehicle with its lights flashing immediately reduce
speed and if it s safe to do so move over in your lane away from the stopped emergency vehicle Drivers should actually change
lanes if there are two or more lanes in the same direction and there are no vehicles in their path
359
Correspondence Packet
Letter from Michael Casanova Chairman Riley Purgatory Bluff Creek Watershed District dated
September 18 2007
Letter from the Metropolitan Area Agency on Aging dated September 18 2007
Letter from Governor Tim Pawlenty dated October 1 2007
Agenda and Materials from the TH 41 Over the Minnesota River EIS Meeting held on
October 4 2007
Memo from Greg Sticha re 2007 Budget vs Actual Revenue Expenditure Reports dated
October 22 2007
Memo from Greg Sticha re Review of Claims Paid dated September 28 2007
Memo from Greg Sticha re Review of Claims Paid dated October 12 2007
360
Riley
Purgatory
Bluff Creek
Watershed District
Web Site httpwww rileypurgatorybluffcreek org
Legal Advisor
Nut Adw cehbl1 LL
Krebsbach and Haik Ltd
225 South Sixth Street Suite 4320
Minneapolis MN 55402
612333 7400 Fax 612 333 6959
Engineering Advisor Barr Engineering
4700 West 77th Street
Minneapolis MN 55435
952 832 2600 Fax 952 832 2601
September 18 2007
Mayor Tom Furlong
City of Chanhassen
7700 Market BI vd
PO Box 147
Chanhassen MN 55317
Mayor Philip Young
City of Eden Prairie
8080 Mitchell Road
Eden Prairie MN 55347
Re Lake Riley Basic Water Management Project
Dear Mayors and Councilpersons
The Board of Managers of the Riley Purgatory Bluff Creek Watershed District
has chosen to coordinate the fish barrier and alum treatment components of the Lake
Riley Basic Water Management Project with the Fish Barrier and Invasive Species
Control Project overseen by Professor Sorenson of the University of Minnesota which
project was initially funded by the Legislative and Citizen Commission on Minnesota
Resources The Board of Managers remains committed to the work and approved a
budget item for continuation of the analysis and development of the fish barriers and
anticipated lake water quality improvements It was judged appropriate to coordinate
with the efforts of the State and the University which are expected to provide new
profound insight into managing invasive species and eliminating the adverse effects of
their presence Given this change the Board of Managers also approved a budget item
for a basic water management project for improving the Lake Riley outlet A hearing on
establishing this outlet project should be held by year end
If you have any questions please contact us
Sincerely
RILEY PURGATOR Y BLUFF CREEK
WATERSHED DISTRICT
BY
Mlchael Casanova ChaIrman
Cc Board of Managers
Board of Managers
Howard Peterson James Landini Kenneth Wencl Michael Casanova Erin Ahola
361
NUI SaHoV L L
METROPOLITAN
AREA AGENCY
on A G N G
RECEIVED
SEP 2 1 Z007
CITY OF CHANHASSEN
Todd Gerhardt
City Manager
PO Box 147
Chanhassen MN 55317 0147
September 18 2007
Dear City Manager
Minnesota s population is aging By 2020 there wiII be more seniors than children in school In 2030 1 in 4
people in Minnesota wiII be older than 65 The implications for all facets of community vitality are enormous
The Metropolitan Area Agency on Aging MAAA is working to help communities prepare for the demographic
shift through a multi faceted capacity building effort Cities and townships play an important leadership role A
critical step is to provide information about the status of planning for an older population in your city or township
Over the next several weeks MAAA is surveying 195 metropolitan communities to determine the status of
planning for the demographic shift often referred to as Communities for a Lifetime MAAA wiII synthesize the
results and make them available to you Ifyou have not already done so please visit www tca in or survev
to complete the brief survey by September 28 2007
MAAA currently features Communities for a Lifetime planning tools and other information on its website Visit
www tcaging org and click on Communities for a Lifetime and learn about ways MAAA can partner with your
city town or county In addition MAAA has partnered with the Vital Aging Network VAN to redesign the Vital
Communities Toolkit The Toolkit wiII become an expanded online repository of a wide array of information that
communities can utilize in planning initiatives
You wiII find enclosed two documents a resolution passed by the MAAA Board of Directors and a demographic
overview to jumpstart local conversations about the need to prepare for a much older age composition
Your leadership and vision is essential now to help your community get ready for an aging baby boom generation
To visit in person about this issue utilize current MAAA information resources or explore partnership ideas with
MAAA please contact Dawn Simonson Executive Director at 651 917 4602 or at dawn@tcaging org or Rajean
Moone Special Projects Coordinator at 651 917 4633 or at raiean@tcaging org
i TrelYVVii
I
way J L
Boa
e
i tors
Tf iL@fl Chair
Communities for a Lifetime Committee
Former Mayor City ofChaska
cc The Honorable Tom Furlong
2365 N McKnight Rd INorth St Paul MN 55109
Phone 651 641 8612 Fax 651641 8618 Senior linkAgeline@ 1 800333 2433
Email maaa@tcaging org Website wwwtcaging org
Helping Elders Age Successfully in the Counties of Anoka Carver Dakota Hennepin Ramsey Scott and Washington362
September 17 2007
METROPOLITAN
AREA AGENCY
on A G 1 N G
METROPOLITAN AREA AGENCY ON AGING
BOARD OF DIRECTORS
Resolution
Developing Communities for a Lifetime in the Metropolitan Region
WHEREAS the Metropolitan Area Agency on Aging Inc MAAA is designated by the Minnesota Board on
Aging as the area agency on aging for the seven county Metropolitan Region and
WHEREAS communities in the Metropolitan Region are experiencing a significant demographic shift that will
result in a larger proportion ofolder persons and
WHEREAS the demographic shift will cause unprecedented pressure on physical civic and service infrastructures
and
WHEREAS the MAAA Board is comprised of local elected officials and other community leaders who represent
the Metropolitan Region are informed about the demographic shift and are concerned about the lack of community
preparedness and
WHEREAS national models of planning and preparedness for the demographic shift known as Communities for a
Lifetime are emerging across the United States and
WHEREAS Communities for Lifetime planning models value individuals of all ages and engage communities in a
process of continuous self assessment and improvement which supports people to live in their communities across
the lifespan and
WHEREAS Communities for a Lifetime planning incorporates the domains of health nutrition exercise
transportation public safety emergency services housing taxation and finance workforce development civic
engagement human services and related policies
NOW THEREFORE BE IT RESOLVED that the MAAA s Board of Directors formally adopts a position that
encourages all communities in the Region to engage in planning for Communities for a Lifetime with leadership
provided by the elected officials ofcities and counties and
BE IT FURTHER RESOLVED that the MAAA s Board of Directors encourages cities and counties to incorporate
planning for Communities for a Lifetime in their Comprehensive Plans and other formal plans
J kJ J0YJ J
Chair i
i Executive Director
Y1f tl GJ J 7 C 7
Officer Date
I
2365 N McKnight Rd INorth St Paul MN 55109
Phone 651641 8612 Fax 651641 8618 Senior linkAgeline@ 1800 333 2433
Email maaa@tcaging org IWebsite wwwtcaging org
Helping Elders Age Successfully in the Counties of Anoka Carver Dakota Hennepin Ramsey Scott and Washington
363
METROPOLITAN
AREA AGENCY
011 A G N G
Fact Sheet
Demographic and Economic Impact ofAn Aging Society
Demography
By 2020 in Minnesota there will be
more people over the age of 65 red
bar than in elementary middle and
high schools put together blue bar
There will be more people over the
age of 65 than young adults green
bar
This phenomenon is characterized as
the Graying of America as the baby
boom generation those born between
1946 and 1964 age
1 400 000
1 200 000
1 000 000
800 000
600 000
400 000
200 000
o
1950 1960 1970 1980 1990 2000 2010 2020 2030
There are other reasons for the high
proportion of older adults including the fact that we are living longer our life expectancy has
doubled over the last 100 years thanks to a number of factors including medical and
technological advances labor laws prevention and social welfare programs
Economy
VVith the rise in the number of oldei adults more peopie will rely onihesenrice siructure of
public entities That structure is funded primarily by public dollars generated from taxes
If we examine an individual with an average income of 35 000 he or she generates
approximately 2 018 in taxes annually Upon retirement this drops to 559 a 72 percent cut
in revenue generated from taxes
Workforce
Workforce statistics show a similar picture The national worker to retiree ratio is estimated to
shift from 4 98 workers per retiree in 2000 to 2 89 in 2030 The adult labor force participation
rate will drop from 67 2 percent in 2000 to 60 5 percent in 2030
On a positive note more older people are remaining in the workforce from 28 7 percent of men
in 1990 to 33 2 percent in 2000
364
Caregiving
Caregiving is a workplace and economic issue Lost productivity due to the burdens of caring
for an older parent or relative are estimated at 114 billion annually in the U S Informal care
provided by caregivers is estimated at 4 56 billion annually in Minnesota
Ten percent of all caregivers leave the workplace entirely 17 percent for intense caregivers
Eleven percent of caregivers take a leave of absence Fifty nine percent of caregivers are
regularly late leave early and or take long lunches Personal phone calls related to caregiving
responsibilities account for more than one hour per week of lost work time Eighty one percent
of employed caregivers report sympathetic attitudes from supervisors who provide emotional
support arrange coverage for absent employees and provide counsel regarding benefits
involved in work disruptions
Impact
The aging of the population is not a natural phenomenon It has never happened before Thats
not to say it is a bad thing just a fact Some communities have begun planning initiatives
related to the demographic shift
But we re not doing enough
We know that 24 of Minnesota baby boomers a total of over 441 000 people out of 1 8
million may not have sufficient resources to cover their retirement and long term care
expenses
A recent national study titled Maturing ofAmerica estimated that only 46 of U S communities
have begun planning to prepare for a significantly older population
Local leaders elected officials and planners can and do play many important roles in
communities including the following
Convening stakeholders from diverse fields and encouraging collaboration
Identifying opportunities to integrate Communities for a Lifetime strategies with
existing plans programs and initiatives
Empowering staff to support and adopt efforts to advance Communities for a
Lifetime
Identifying sustainable funding streams from private and public sources to supportcommunitywidecollaborations
Encouraging public support for creative new approaches that will enable the
community to remain livable for all residents
Providing a forum for older adults to share their talents and concerns
Sources 1997 MetLife Foundation Study Brookings Institution Center for the American Experiment MN State
Demographic Center MN Department of Human Services MN State Economist State Health Access Data
Assistance Center U S Census Data
The Metropolitan Area Agency on Aging serves the seven county metro area by administering the Older
Americans Act providing the Senior LinkAge Line@ and coordinating planning and development More
information can be obtained from www tcaaina ora
365
STATE OF MINNESOTA N J IMA tl C C
Office o Governor Tim Pawlenty
130 State CapItol 75 Rev Dr Martin Luther King Jr Boulevard Saint Paul MN 55155
RECEIVED
OCT 0 3 2007
CITY OF CHANHASSEN
MEMORANDUM
To Governing Bodies of Metropolitan Counties Cities and Townships
In Metropolitan Council District 4
From John Hultquist
Director of Judicial Board and Commission Appointments
Date October 1 2007
Re Metropolitan Council District 4 Vacancy and
Public Hearing Information
As per Minnesota Statutes 473 123 subdivision 3 b this memo provides
notification of a vacancy on the Metropolitan Council Brian Lundquist who had
been serving as the Metropolitan Council member from District 4 resigned
I invite your participation and recommendations on these appointments Please
see the attached news release which describes the appointments process
If you have any questions please contact me via e mail at
john huHquist@state mn usor via telephone at 651 296 0019
Voice 651 296 3391 or 800 657 3717 F 651 296 2089
Web site http jjax TDO 651 296 00750r 800 657 3598
wwwgovernor state mn us An Equ lOt t E 1
p d
a ppor Un y mp oyer
rmte on recycled paper containing 15 post consumer material366
OFFICE OF GOVERNOR TIM PAWLENTY
130 State Capitol Saint Paul MN 55155 651 296 0001
NEWS RELEASE
FOR IMMEDIATE RELEASE
October 1 2007 Contact Brian McClung
651 296 0001
GOVERNOR PAWLENTY ANNOUNCES
METROPOLITAN COUNCIL VACANCY
Saint Paul Governor Tim Pawlenty today announced that applications are being accepted fortheDistrict4seatontheMetropolitanCouncilThevacancyoccurredasaresultoftheresignationofBrianLundquistonJuly312007
District 4 includes all of Carver and Scott Counties and the Hennepin County cities ofMinnetristaandStBonifacius
The Secretary of State s office published this vacancy today October 1 2007 AnyoneinterestedinapplyingforthispositionmustcompleteanOpenAppointmentsApplication FormApplicationformsmaybedownloadedfromtheSecretaryofStatesofficefromtheirwebsitewwwsosstatemnusorbycalling6512975845ApplicantsareaskedtoattachacurrentresumetotheirapplicationThedeadlineforreceiptofallapplicationmaterialsincludinganylettersofrecommendationsubmittedonbehalfofapplicantsisTuesdayOctober232007at430pm
A seven member Metropolitan Council Nominating Committee which recommends candidatesfortheMetropolitanCounciltotheGovernorwillhostapublichearingtoacceptstatementsfromoronbehalfofapplicantsforthisposition
Governor Pawlenty has designated the following citizens to serve on the Metropolitan CouncilNominatingCommittee
Mike Burton Minnetonka
Dave Clark Blaine Blaine City Council
Song Lo Fawcett St Paul
Cyndee Fields Eagan Eagan City Council
Paul Gaston Vadnais Heights Vadnais Heights City CouncilMarkSchiffmanWaconiaMayorofWaconia
Maureen Shaver Deephaven
The public hearing will be conducted on Thursday November 1 2007 beginning at 7 00 p m intheScottCountyCommissionersBoardRoomlocatedonthesecondflooroftheScottCountyGovernmentCenter200FourthAvenueWestinShakopeeApplicantswillreceivedetailsontheformatofthehearingpriortothehearing
more
www governor state mn us 651 296 0001 651 296 0056 fax
367
Questions concerning the appointments process should be directed to John Hultquist OpenAppointmentsCoordinatorat6512960019oriohnhultauist@statemnus
The Metropolitan Council coordinates planning and development in the seven countymetropolitanareaanddirectlyoperatesseveralregionalservicesTheMetropolitanCouncilconsistsof16metropolitancitizensappointedfromgeographicallydefineddistrictsinthesevencountymetropolitanareaandachairAll17membersareappointedbytheGovernortofour
year terms that are co terminus with the Governor
30
www govemor state mn us 651 296 0001 651 296 0056 fax
368
TH 41 Over the Minnesota River EIS
Stakeholder Advisory Committee Meeting
Thursday October 4 2007 1 00 3 00 p m
Chanhassen Library Wilder Room
7711 Kerber Boulevard Chanhassen
1 00 p m 1
1 30 p m 2
2 00 p m 3
2 30 a m 4
AGENDA
L
Project status sChed le and next steps
Public hearing and comment summary enclosed
Revised summary table
Questions
H IProjectsl6179lEPIMeetingslSACI 1O 04 07SAC Agenda 100407 doc
369
August September 2007
October November 2007
By end of year 2007
Winter Spring 2008
Spring Summer 2008
I Fall 2008
I End of 2008
TH 41 Minnesota River Crossing EIS
Study Advisory Committee Meeting
October 4 2007
Next Steps Schedule
Collect and summarize comments on DEIS Update impacts summary
T
Review key comments on sufficiency of analysis in DEIS determine any
additional work needed to inform the Preferred Alternative decision
Mn DOT and FHWA
Conduct any indicated additional work to sufficiently inform Preferred
Alternative selection timing depends on work needed
Confer with agencies on mitigation opportunities for key impacts
T
Propose Preferred Alternative based on consideration of relative benefits
relative impacts mitigation opportunities and agency discussions Mn DOT
and FHWA
Determine any additional work needed to refine Preferred Alternative
T
Conduct additional work develop responses to DEIS comments prepare
FEIS document
T
Facilitate agency review of preliminary FEIS document and refine as
necessary
T
I Release FEIS
T
Prepare and publish Record of Decision and Adequacy Determination
C IDocuments and SettingslnfricklLocal Settingsl TempIXPGrp Wiseflow chart handout doc
370
TH 41 MINNESOTA RIVER CROSSING
DRAFT ENVIRONMENTAL IMPACT STATEMENT
PUBLIC HEARINGS AND PUBLIC INFORMATION MEETING
PUBLIC AND AGENCY COMMENTS
SUMMARY
SEPTEMBER 2007
PUBLIC HEARINGS AND PUBLIC INFORMATION MEETING
Concurrent with the publication of the TH 41 Minnesota River Crossing Draft Environmental Impact
Statement two public hearings and one public information meeting were held during July 2007
Public Hearings were held on July 11 and July 18 2007 at the Scott County Conference Center
Shakopee Minnesota and the Chaska Community Center Chaska Minnesota On July 17 2007 a
public information meeting was held at the Riverview Terrace Mobile Home Park Community Room
Newsletters announcing the public hearings were distributed to all project area property owners based
on County property records stakeholder agencies and other interested persons Additionally
residents of the four potentially affected mobile home park communities received a flyer announcing
the July 17 public information meeting The flyer provided a Spanish translation
All meetings followed an open house format where attendees were invited to view boards displaying
project need schedule and impacts as well as layouts depicting the six project alternatives Project
staff including representatives from MnlDOT and SRF Consulting Group Inc were available to
answer questions
At all meetings attendees were encouraged to provide comments Information about how to comment
along with comment cards were provided Visitors were requested to leave comment cards at the open
house or mail them to Diane Langenbach MnlDOT project manager by August 10 2007 A
registered court reporter was available at the two public hearings to transcribe verbal comments
July 11 Public Hearing Scoff County Conference Center
The July 11 2007 public hearing was held at the Scott County Conference Center in Shakopee
Minnesota A total of 73 people signed in Six written comments were received at the meeting and
five verbal comments were recorded
July 17 Public Infonnation Meeting Riverview Terrace
The July 17 2007 information meeting was held at the Riverview Terrace Community Room in
Carver County A total of 43 people signed in A Spanish translator was provided to assist meeting
attendees and comment cards provided Spanish translations Five written comments were received at
the meeting
DEIS COMMENT SUMMARY 928 07 1371
July 18 Public Hearing Chaska Community Center
The July 18 2007 public hearing was held at the Chaska Community Center in Chaska Minnesota A
total of 346 people signed in A total of 91 written comments were received at the meeting and 21
verbal comments were recorded
As of August 28 2007 637 additional comment cards letters postcards and emails have been
submitted
PUBLIC AND ORGANIZATION COMMENTS BY TOPIC
Proiect Preference
Alternative W 2 198 Comments
Comments Supporting Alternative W 2 154 Total Comments
Ninety five 95 comments indicated a general preference for the W 2
Twenty 20 comments supported W 2 because it was the lowest cost
Nineteen 19 comments supported W 2 because it would have the least impact on existinghomesandBusinesses
Six comments suggested that surrounding communities would benefit economically from W 2
Six comments supported W 2 because it would be built on open land
Three comments supported W 2 because it would have the least environmental impact
One comment supported W 2 because it would have the least impact on parks
One comment supported W 2 because it would take stress offTH 169
Two comments indicated support for W 2 Chaska Cubs Baseball Board and Discovery United
Methodist Church
One comment indicated preference for W 2 because it would not displace mobile home
communities and would have the least impact on the environment Church of the Guardian
Angels
Comments Opposing Alternative W 2 39 Comments
Ten 10 comments indicated that W 2 would negatively impact the historic character of the
City of Carver
Seven comments were against W 2 because it would disrupt the Minnesota Valley National
Wildlife Refuge
Four comments recommended removing Alternative W 2 from consideration
Four comments stated that Chaska has received the economic benefit of growth and should bear
the burden by building closer to Chaska than to Carver
Four comments opposed W 2 because it would be the most damaging to the Minnesota ValleyStateRecreationArea
Three comments indicated W 2 would discourage economic growth in the City of Carver
Two comments opposed W 2 because it would negatively impact neighborhood and home
values
Two comments indicated that W 2 would devastate the Skyview Lane neighborhood
One comment opposed W 2 because it would have a damaging visual impact on the Minnesota
Renaissance Festival grounds
DEIS COMMENT SUMMARY 928 07 2372
One comment opposed W 2 because it would have the least travel demand
One comment opposed W 2 because it would disrupt Riverside Park in the City of Carver
General Comments Regarding Alternative W 2 5 comments
One comment stated that local ramps at new TH 212 CSAH 11 would need to be reconstructed
to accommodate W 2 Centex Homes
One comment stated that there are five current or planned pedestrian trails and or bike routes
that are within or intersect W 2 which were not addressed in the DEIS Centex Homes
One comment recommended that the southern portion of Alternative W 2 be moved north of
the proposed Highway 212 ramp or 200 300 feet across from existing Highway 212 Centex
Homes
One comment stated that local access for Spring Creek neighborhood to W 2 should be
addressed Centex Homes
One comment stated W 2 does not consider the impact of vegetation degradation
Central Alternatives 88 Comments
Comments Supporting Central Alternatives 12 Comments
Eight comments supported consideration of a modified route that would save the ballpark and
impact fewer homes
Three comments favored combing the northern portion of Alternative C 2 with the southern
portion of Alternative C 2A
One comment supported either option as long as the ballpark was preserved
Comments Opposing All Central Alternatives 11 Comments
Five comments opposed both central alternatives generally
Three comments opposed both central alternatives because of air pollution
Two comments opposed both central alternatives because of noise pollution
One comment opposed the central and no build current configuration alternatives because of
the negative impact to the City of Chaska s historic downtown and ballpark Chaska
Downtown Business Council
General Comments Regarding Central Alternatives 8 Comments
Five comments recommended preserving the ballpark
Three comments supported moving the ballpark
Comments Supporting Alternative C 2 36 Comments
Eighteen 18 comments supported C 2 generally
Four comments supported C 2 because the area is accustomed to traffic
Four comments supported C 2 because of its lower cost
Three comments supported C 2 because it would have the least environmental impact
Two comments supported C 2 because the route avoids downtown Chaska
Two comments indicated a preference for C 2 because it would have the least adverse
environmental impacts Minnesota Valley National Wildlife Refuge Minnesota River Valley
Audubon Chapter One comment supported C 2 because it would disturb the least amount of
wildlife habitat and other natural resources Friends of the Minnesota Valley
DEIS COMMENT SUMMARY 928 07 3373
One comment stated that C 2 is the only alignment that should be considered because it follows
the current TH 41 alignment as closely as possible and has the least environmental impact
Minnesota Valley Trust
One comment indicated preference for C 2 because it would result in the least damage to the
integrity of the Minnesota Valley National Wildlife Refuge and other natural resources
Minnesota Center for Environmental Advocacy
One comment supported C 2 because it would take the traffic out of downtown Chaska
Comments Opposing Alternative C 2 5 Comments
Four comments opposed C 2 generally
One comment indicated a strong objection to C 2 because of its impact on Historic Chaska
Baseball Park and Historic Chaska Downtown Chaska Cubs Baseball Board
General Comments Re arding Alternative C 2 2 Comments
One comment stated there is one trail that is within the C 2 alignment that was not addressed in
the DEIS Centex Homes
One comment recommended that the southern C 2 alignment limits be moved north of the
proposed Hwy 212 ramp or 200 300 feet across from existing Hwy 212 Centex Homes
Comments Supporting Alternative C 2A 6 Comments
Six comments supported C 2A generally
Comments Opposing Alternative C 2A 6 Comments
Five comments indicated C 2A would ruin the ballpark
One comment indicated C 2A would ruin area parks and trails
Eastern Alternatives 391 Comments
Comments Opposing All Eastern Alternatives 331 Comments
One hundred ninety 192 comments opposed all eastern alternatives
Forty nine 49 comments opposed eastern alternatives because of the number of displaced
homes and families
Forty nine 49 comments opposed eastern alternatives because the other alternatives would be
more cost effective
Twenty two 22 comments opposed eastern alternatives because they would not protect
established neighborhoods
Fifteen 15 comments opposed the eastern alternatives because they would bisect the
community
One comment vehemently opposed all eastern alternatives All Parks Alliance Alliance for
Metro Stability Discovery United Methodist Church East Chaska Citizens Group Housing
Preservation Project Sierra Club North Star Chapter
One comment urged for the removal of all eastern alternatives due to the impact on the
Seminary Fen and Assumption Creek Cedar Lake Park Association
One comment strongly opposed all eastern alternatives due to the impact on the mobile home
parks and the Seminary Fen Discovery United Methodist Church
One comment opposed separating Chaska and Chanhassen
DEIS COMMENT SUMMARY 928 07 4374
Comments Supporting E l 1 Comment
One comment supported E l generally
Comments Opposing Alternative E l 20 Comments
Eight comments recommended eliminating E l because it would be the most harmful option
Six comments opposed E l because it would encroach on school properties
Four comments opposed E l generally
Two comments opposed E l because it would separate the town
Comments Supporting Alternative E IA 2 Comments
One comment supported E IA generally
One comment supported E IA because would be consistent with the comprehensive plan
Comments Supporting Alternative E 2 5 Comments
Five comments supported E 2 generally
Comments Oposing Alternative E 2 29 Comments
Nineteen 19 comments opposed E 2 because it would lower home values
Ten 10 comments opposed E 2 because it would have a negative impact on the City of
Chaska s economy
General Comments Regarding Alternative E 2 1 Comment
One comment noted that the number of parcels affected by E 2 should be 134 not 34 as
indicated in the text under Social Economic and Environmental Impacts
No Build Alternative 9 Comments
Nine comments supported the No Build Alternative
Other Alternatives 4 Comments
Two comments indicated strong opposition to Alternatives C 2 C 2A E l and E IA due to
the negative impact on the Chaska historic district Chaska Historic Society and Chaska
Historical Preservation Commission
One comment supported the existing alignment due to the impact the other alternatives would
have on the Seminary Fen and other unique wetlands Minnesota Native Plant Society
One comment stated that none of the alternatives proposed offered a perfect solution to the
bridge location Chaska Area Chamber of Commerce
One comment opposed all alternatives and encouraged reconsideration of the two routes that
had previously been removed from consideration Sierra Club
Environmental 237 Comments
Seminary Fen 146 Comments
One hundred forty five 145 comments supported protecting Seminary Fen and Assumption
Creek
One comment supported preserving the Seminary Fen Chaska Moravian Church
DEIS COMMENT SUMMARY 928 07 5375
Wildlife 23 Comments
Seventeen 17 comments supported protecting threatened species generally
Five comments indicated general concern about impacts to wildlife
One comment indicated concern about impacts to natural resources rare plant species and
wildlife from all alternatives All Parks Alliance Alliance for Metro Stability Discovery
United Methodist Church East Chaska Citizens Group Housing Preservation Project and
Sierra Club North Star Chapter
Wetlands 15 Comments
Fifteen 15 comments supported protecting wetlands generally
Noise Air Impacts 44 Comments
Twenty five 25 comments indicated general concern about noise pollution
Fourteen 14 comments indicated general concern about air pollution
Three comments expressed concern about vibrations from the bridge and roadway
One comment recommended that more information on the potential noise impacts of all
alternatives be provided
One comment recommended that a noise analysis be updated due to an insufficient number of
receptors in Carver Centex Homes
ParksRecreation 2 Comments
Two comments opposed any alternative that would impact DNR land
Visual Impacts 8 Comments
Eight comments indicated general concern about visual pollution
Community 708 Comments
Mobile Homes Affordable Housing 581 Comments
Four hundred three 403 comments opposed alternatives that would negatively impact trailer
or mobile home parks
Ninety six 96 comments provided from interviews by All Parks Alliance for Change
opposed alternatives that would negatively impact mobile home parks All Parks Alliance
Seventy six 76 comments opposed displacing low income affordable housing
One comment stated the Draft EIS did not adequately consider the environmental justice effects
of the loss of affordable housing Housing Preservation Project
One comment stated the Draft EIS did not adequately disclose the economic impacts of
alternatives because it did not discuss the costs of replacing lost affordable housing Housing
Preservation Project
One comment indicated that five of the six alternatives would negatively impact mobile home
park communities All Parks Alliance Alliance for Metro Stability Discovery United
Methodist Church East Chaska Citizens Group Housing Preservation Project Sierra Club
North Star Chapter
One comment stated the analysis of effects on environmental justice is inadequate and
inaccurate All Parks Alliance
One comment stated the analysis of effects on fair housing opportunities is inadequate and
inaccurate All Parks Alliance
DEIS COMMENT SUMMARY 928 07 6376
One comment stated that there has been a shift in demographics since the 2000 Census and the
Hispanic population is much higher in the mobile home communities Recently completed
demographic surveys were provided All Parks Alliance
Cultural Resources 38 Comments
Twenty eight 28 comments opposed disrupting Native American sites
Ten 10 comments opposed disrupting archaeological sites
Community Character and Facilities 49 Comments
Ten 10 comments supported preserving the Freshman Center
Nine comments opposed disrupting school zones
Thirty 30 comments opposed alternatives that would have a negative impact on the small
town character and feel of downtown Chaska
Spring Creek Neighborhood 3 Comments
One comment indicated that the Draft EIS did not identify the need to realign Spring Creek
Drive Carver for Alternatives W 2 and C 2 Centex Homes
One comment recommended that a visual impact analysis be done for the Spring Creek
neighborhood in the City of Carver Centex Homes
One comment indicated that the number of right of way acquisitions in the Spring Creek
neighborhood of the City of Carver for Alternatives C 2 and W 2 is incorrect Centex Homes
New Development and Future Growth 37 Comments
One comment indicated that indirect economic impacts related to marketability and
infrastructure connections to residential projects currently under construction in Carver were
not included in the Draft EIS Centex Homes
Thirty six 36 comments supported building west toward future growth
General 40 Comments
Five comments indicated the need to make a decision for a Preferred Alternative soon
Four comments wanted more detail about the property acquisition process
Three comments were generally concerned about increased traffic due to the proposed project
Three comments recommended considering a mass transit alternative
Two comments supported building the bridge west of Chaska in general
Two comments indicated the need for a tunnel option
Two comments indicated the need for pedestrian and bicycle facilities on the bridge
One comment recommended re zoning for the western alternatives to prevent redevelopment in
the right of way
One comment indicated that comments were not summarized correctly last round
One comment questioned why there were not alternatives within the 70 50 andor 25 year
floodplains
One comment suggested the need for weight restrictions on the bridge
One comment generally supported the need for a bridge
One comment asked if the bridge would be part of an outer beltway
One comment supported choosing the alternative with the lowest cost regardless of the route
One comment suggested including a personal rapid transit alternative
One comment recommended that the study take into account future gas prices
DEIS COMMENT SUMMARY 928 07 7377
One comment recommended that the study take into account carbon dioxide emissions
One comment indicated dissatisfaction with the public meeting because it did not allow for
questions
One comment indicated a need for more alternatives
One comment indicated the river crossing should be in Shakopee through Flying Cloud
One comment indicated the river crossing should be in Jordan at Highway 9
One comment stated that the bridge should be a higher priority than the current 20 year time
frame Chaska Area Chamber of Commerce
AGENCY COMMENTS BY AGENCY AND TOPIC
Minnesota Department of Agriculture
Restricted Road Access
Restricted access will directly impact farming operations by increasing transportation costs and
displacing heavy vehicles and equipment onto weight restricted county roads
FEIS should include a map of locations where direct access to TH 41 will be closed
Severed Triangulated or Isolated Farmland
FEIS should address the acreage or impact of any severed triangulated or isolated farmland
resulting from each alternative
Parcels of farmland should be identified by location and acreage
Relocating Farming Operations
FEIS should include the number of any farming operations that will be relocated indicate their
location on a map and identify if the farm is a livestock operation
Agricultural Preserves or Conservation Reserve Program
FEIS should identify if any farmland is in the Conservation Reserve Program or agricultural
preserves
Miscellaneous
Project team should periodically meet with farmers agricultural businesses and MDA to
discuss potential impacts final locations and completion dates as they are determined
Minnesota Department of Health
Drinking Water ProtectionlStormwater Management
Stormwater management within drinking water supply management areas associated with the
wellhead protection areas for the cities of Shakopee Chaska and Carver should avoid the use
of infiltration if possible
Wellhead protection planning has not been completed for several public water supply systems
in the project area including those that service the four mobile home parks and many of the
wells used for these systems are vulnerable
Stormwater infiltration should be avoided within 200 feet of vulnerable public water supply
wells lacking delineated wellhead protection areas
DEIS COMMENT SUMMARY 9 28 07 8378
Minnesota Pollution Control Agency
Stormwater Management
DEIS implies that the bridge deck roadway drainage will be directed to an off end spill
containment area as required by the MPCA
PElS should specifically state that stormwater and surface water deck drainage will be
directed to an off end drainage and containment system to assure that any possible toxic or
hazardous material spills that might occur on the bridge will not drain directly to waters of the
state
Impaired Waters
DEIS lacks a discussion of direct construction related impacts of the various build
alternatives to surface water impairments particularly the Minnesota River
PElS should identify both potential impacts and potential mitigation measures to surface water
impairments
Wetlands
Alternatives E l E IA and E 2 should be avoided due to their impact to the Seminary Fen
Permits and Approvals
Please explain whether and how it has been determined that a permit from the U S Coast
Guard for Section 9 of the Rivers and Harbors Act for navigable waters is not needed for this
project
Metropolitan Council
Transportati on
Right of way preservation identified in the Metropolitan Council s 2030 Transportation Policy
Plan for the TH 41 Minnesota River Crossing is in the vicinity of the eastern alignments
The assumption that TH 169 would be completely converted to a limited access facility by
2040 may not be realistic given current funding sources
Parks and Open Space
Council staff strongly recommends that Alternative C2 A be dismissed based on its significant
impact to the planned Southwest Regional Trail Connection
Alternative C 2 as well as the eastern alignments will visually impact the Southwest Regional
Trail Connection
Wastewater Service
Final plans should be sent to Scott Dentz to assess potential impacts to the interceptor system
Department of Natural Resources
General Comments
Favors Alternative C 2 as least environmentally damaging alternative
Physical Environment
Concerns include habitat fragmentation caused by the bridge and deteriorated vegetation and
reduced species composition resulting from concentrated surface runoff sand and road salt and
potential material and chemical spills
DEIS COMMENT SUMMARY 9 28 07 9
379
Traffic Noise
FEIS should include an accurate measure of mitigation that will be needed for noise impacts
Appropriate mitigation needs to be applied to compensate for the loss of suitable habitat that
will be affected by the increased noise levels
To determine mitigation for the increased noise exposure to the natural areas visitors and
wildlife the DNR recommends that a supplemental study be developed that defines noise
contours from each of the alternatives
Air Qualitv
Error in Table 14 of Executive Summary the cell under column C 2 should read 2 Medium
risk sites
Native Plants
Affected species include high quality emergent marsh floodplain forest and lowland hardwood
forest
Parks and Trails
Public access to the Minnesota Valley Trail needs to be maintained and trails need to maintain
their connectivity
Surface Water Quality
Proper management and mitigation should be incorporated to mitigate for anticipated impacts
on surface water quality
If containment areas are developed to handle accidental material spills the additional impact
needs to be addressed
MnDNR would like to see further quantification of the impacts on surface waters from
pollutants generated by road construction and increased traffic
Wetlands
Mitigation opportunities should be examined early particularly in relationship to stormwater
management erosion control and habitat fragmentation
Historic and Archaeological Resources
Add data from the Phase 1 and Phase 2 investigations as well as other fieldwork done in the
corridor to the appendix
Cumulative Impacts
Draft EIS does not directly address the cumulative impacts on the Minnesota Valley National
Wildlife Refuge the Minnesota Valley State Recreation Area or other public and private semi
natural lands within the Lower Minnesota River Valley
MnDNR would like further quantification of cumulative impacts with respect to other major
river crossings such as I 35E Mendota Bridge Cedar Avenue Bridge I 35W and
Bloomington Ferry Bridge
Ownership Issues
Prior to construction easements between MnlDOT and MnDNR Division of Parks and
Recreation will need to be negotiated
DEIS COMMENT SUMMARY 928 07 10380
Federal Emergency Management Agency
Permits and Approvals
A county floodplain development permit is required for development affecting floodplains
A State of Minnesota floodplain permit may be required
u s Coast Guard
Coast Guard Bridge Permit is not required
Please provide as built drawings of the replacement bridge when the project is completed
National Oceanic and Atmospheric Administration
National Ocean Services requires 90 day notice in advance of planned activities which will
disturb or destroy geodetic control monuments
Environmental Protection Agency
Document
Draft EIS does not contain sufficient information for the EPA to fully assess the environmental
impacts that should be avoided in order to fully protect the environment
Alternatives
Opposed to E IA and E 2 due to direct and indirect impacts to the Seminary Fen Wetland
Complex
Alternatives W 2 C 2 C 2A and E l would impact a variety of important resources in the
study area including but not limited to 9 0 to 16 1 acres of non calcareous fen wetlands
Recommends that Alternative E l should not be the Preferred Alternative unless the FEIS
includes an adequate conceptual wetland mitigation plan and provides assurances that suitable
affordable housing will be available
Wetland Mitigation
EPA wants to see some up front mitigation for the identified Preferred Alternative including a
conceptual mitigation plan for expected wetland impacts
Mitigation plan should include potential locations with assurances to set the land aside for the
specific purpose of wetland mitigation for the project a compensatory mitigation ratio of 15 1
depending on the quality of the wetlands destroyed and acknowledgement that the ratio
might be as high as 10 1 for forested wetland impacts or even higher if calcareous fens are
involved
Scott County
Natural Resources Staff
Chapter 7
Figure 7 3A is confusing p 7 34 Does the second legend item refer to short sedge fen that
currently meets fen criteria or only short sedge fen that potentially meets the criteria with some
level of restoration
Impacts to construction aggregate sources should be discussed in Section 74 in light of concern
by the Metropolitan Council and others over the long term availability of aggregate sources in
the metropolitan area
DEIS COMMENT SUMMARY 928 07 11381
Chapter 9
Draft EIS does not identify drainage patterns outside the project corridor which is where Scott
County has potential stormwater management and flooding issues with some of the alignments
particularly Alternative W 2 at the proposed intersection with TH 169 The drainage figures
should more clearly define how water will leave the project area
What is the overall assumption with respect to crossing areas with existing gravel mining
operations
The ponds in the analysis were sized to existing conditions not to pre settlement conditions as
required by Scott County see page 9 1
Do local communities agree with the assumption that the study area will be fully developed
page 9 2
For Alternative W 2 it is not clear that given the current use of the property west of TH169 as
a gravel quarry how ponds or the road for that matter will be elevated above the current pit
floor to match the existing TH 169 grades
There is a known landlocked pond issue in the NE quadrant of the TH 41ffH169 intersection
which affects all alternatives
Under Alternatives E l E IA and E 2 flow to the northeast to the City of Shakopee
Stormwater system will require coordination to define drainage paths to the downstream
resources
Page 9 18 BMPs would be incorporated as required to meet state and federal water quality
regulatory requirements What about local requirements which are more resource specific
than state and federal requirements
Pages 9 18 and 29 The high groundwater susceptibility area in Scott County that all
alternatives cross will require lined ponds and three feet of separation from bedrock seasonal
groundwater tables as per Scott County rules
Page 9 19 There is little discussion of local watersheds
Page 9 28 References to the 1982 Geological Atlas should be updated as a new atlas is
available for use
Transportation Staff
Chapter 1
Page 1 10 How does constructing the CSAH 14 and TH 169 interchanges with the river
crossing impact the current environmental process
Table 1 3 does not mention County permits or plan approval
Chapter 2
Page 2 5 What is the source for the statement Shakopee is home to the state s largest land
area of industrial park
Page 2 6 Why does ADT for the 1 35W river crossing jump from 102 000 in 2000 to 141 000
in 2004
Pages 2 7 to 2 11 Why was only PM peak hour looked at Would AM peak have the same or
worse LOS or create unique issues due to anticipated future development in Scott County
Do the alignments have adequate room between ramps or will there be weave issues Can
special transit ramps or bus shoulders be addressed in future design
DEIS COMMENT SUMMARY 928 07 12382
Draft EIS should discuss future transit park and ride locations as well as bike and pedestrian
facilities
Chapter 3
Figure 3 6 The ramps do not leave much developable room after a frontage road is included
would total acquisition of those parcels be necessary
Figures 3 7 and 3 8 There appears to be less than 1 000 feet between Ramp H and the future
frontage road on the east side of Highway 169
Page 3 31 Shakopee will further inform planning It may mean involve
Chapter 5
Table 5 10 When was the right of way impacts analysis conducted does it assume plats in the
works
Planning Staff
Chapter 2
Draft EIS does not mention the 2003 TH 169 Frontage Road and Interchange Study TH 41 to
CSAH 14 59 which seems to be an important MnDOT transportation plan to consider
Chapter 5
Draft EIS does not mention the joint study by Scott County and the Metropolitan Council to
identify a site and service area for a future regional wastewater treatment plant along the
Minnesota River
Figure 5 4 The proposed land use 2030 map shows large parcels in Jackson Township as
AgriculturalFarmstead which is inconsistent with the City of Shakopee s land use plans
which call for residential and commercial uses for this future growth area
Chapter 13
The discussion regarding cumulative impacts on affordable housing does not mention Scott
County s or Carver County s zoning rules with respect to new mobile home parks Scott
County s zoning ordinance only allows new mobile home parks if they are hooked up to and
served by a public sewer and water system
Shakopee City Council
The eastern alternatives have the greatest positive impact on the regional transportation system
and best serve existing and logical future growth and development patterns in the City of
Shakopee and Scott County
City Council supports preservation of one of the eastern corridors along with immediate
commencement of discussions between MnDOT and DNR at the commissioner level aimed at
development of a long term management plan for the Seminary Fen
City Council supports efforts and discussion between the Metropolitan Council Scott and
Carver counties and the appropriate cities to address long term affordable housing needs in the
event that an eastern alignment is chosen resulting in the relocation of a large number of
residents of mobile manufactured homes
Alternative W 2 has the least positive impact on the overall regional transportation system and
has the greatest potential to negatively impact land use growth and development patterns in
northern Scott County
Alternatives C 2 and C 2A have the greatest potential impact on natural resources
DEIS COMMENT SUMMARY 928 07 13383
City Council supports having the Legislature make available additional funds to assist in the
acquisition of land for and construction of this project well in advance of its currently
contemplated timeframe
City of Shakopee
Transportation Impacts
Whatever alternative is selected direct and convenient access to CSAH 69 must be preserved
Because local roadways will not be built as a part of this project it will be important for the
City County and MnDOT to continue to work cooperatively to make sure that funding is in
place to construct the needed ramps and local roadway connections
The eastern alternatives have the greatest positive impact on reducing ADT numbers on TH
169 and the TH 101 river crossing
Land Use Impacts
A key consideration in determining where to locate the new river crossing should be whether it
is spaced in such a way to best serve both existing development and new areas of growth
The ultimate choice of alignment has a significant impact on whether commercial and
industriallbusiness park land uses will develop in western Shakopee and Jackson Township
Alternative W 2leaves little opportunity in the immediate vicinity ofthe TH 41rrH 169
interchange for the development of high quality land uses Furthermore it may tend to spur
development to the south of the TH 41rrH 169 interchange and would likely have an impact on
the desirability of the northern portion of the TH 169 CSAH 69 corridor
If one of the eastern alternatives is chosen decisions about the location of supporting local
roadway connections the impact it may have on the developability of adjacent lands for the
intended commercial and business park uses will be key to the future land use success of the
area
Natural Resource Impacts
City s Environmental Advisory Committee expressed their preference of an alternative that
would not impact the Seminary Fen
City of Shakopee recommends that discussions aimed at the development of a management
plan for the Seminary Fen commence as soon as possible between MnlDOT and MnDNR at the
commissioner level The City Council has concluded that the eastern alternative alignments
may provide the greatest overall benefit to the regional transportation system
Social Justice Impacts
City recommends that Met Council take a lead role in convening discussions between the City
Council Carver and Scott Counties and the communities within the Counties to determine how
and where to provide housing for those who would be impacted by these alignments
City of Chaska
Alternatives C 2 C 2A E l and E 1A are inconsistent with the City s long term land use
planning and would cause significant disruption to the community
Chaska City Council at its July 16 2007 meeting unanimously endorsed Alternative W 2 as the
Preferred Alternative
City of Chaska is willing to work with MnlDOT to preserve the Union Pacific rail spur corridor
as a mitigation opportunity for Alternative W 2
DEIS COMMENT SUMMARY 928 07 14384
City recommends that right of way acquisition be initiated immediately following identification
of the Preferred Alternative in order to preserve the corridor prior to development
City of Chanhassen
The City does not agree that Chanhassen s population will be 45 900 in 2040 as the
Metropolitan Council s 2030 population projection for Chanhassen is 38 000
The City ranks Alternatives W 2 and C 2 as their top two choices
The City does not support Alternatives E l E IA or E 2
Carver County
Chapter 1
Table 1 3 should list the local watershed districts and WMOs and their appropriate permitting
roles
The entire document should clearly reference that stormwater mitigation is a required activity
for all alternatives
Chapter 2
Population forecasts listed in Table 2 1 appear very low
The statement in Section 22 4 2 2 that the new river crossing would decrease overall
congestion and therefore facilitate bus or vanpool service contradicts existing transit patterns in
the area and seems incomplete What is this section intended to state
Chapter 4
Table 4 1 Do the TH 101 and New TH 41 volume variations in the six alternatives represent
regional trips or local trips
What capacity expansions are indicated by each of the alternatives for the TH 101 TH 41 and
CSAH 9 45 crossings
What is the predicted change in the number and rate of crashes on TH 101 under the various
alternatives
When will mitigation cost estimates be introduced into the project consideration process
On page 4 21 are the long distance trips on existing TH 41 north and south of the Minnesota
River classified as regional or local trips
On page 4 21 is the identified traffic from western Carver County classified as regional or
local
In Section 4 7 2 are the differences in the 2040 truck forecasts for the TH 101 and TH 41
crossings under the six alternatives statistically significant
Chapter 6
References to Chaska Township in Section 63 2 should be removed as the township was
annexed by the City of Chaska in January 2006
Section 6 5 2 should state clearly that users will experience adverse visual impacts as there is
no way to completely shield a river crossing from the riverway
Chapter 9
Available information for impaired waters listings and TMDLs should be referenced
Lower Minnesota River Watershed District should be mentioned in Section 9 1 1
DEIS COMMENT SUMMARY 928 07 15385
References to watersheds and creeks need correction and clarifying There are three
watersheds and creeks draining into the project area from the Carver County side of the river
Carver Creek West Chaska Creek and East Chaska Creek
For Section 9 1 3 2 additional review should occur to investigate if ponds can be over the 100
year flood elevation CCWMO does not support ponding without 100 year protection
Chapter 15
Table 15 1 should read Carver County WMO
Carver County Board of Commissioners
All of the Alternatives excepting the No Build are generally positive in terms of Carver
County s economic development potential
Analysis of the alternatives does not reflect the potential for economic development at each
proposed interchange and bridge crossing Economic development opportunities have been
proposed by the City of Chaska along the W 2 C 2 and C 2A alignments
Stormwater wetland and floodplain impacts will occur for all alternatives and full mitigation
is an expected activity for all alternatives
Board of Commissioners supports the preservation of either the Alternative W 2 or Alternative
C 2 corridor
Carver City Council
City is extremely concerned that the assumed TH 41rrH 212 interchange design and
functionality may not be sufficient to address what is actually required given the CSAH llrrH
212 interchange currently under construction City consultant CH2M Hill has also raised
questions regarding the functionality of the proposed interchanges with TH 212 for Alternatives
W 2 and C 2 City requests that MnlDOT complete additionally analysis to evaluate the
functionality of the proposed interchanges of Alternatives W 2 and C 2 with TH 212
Commented on the constructive use impacts to MVNWR resulting from Alternative W 2
Riverside Park is a Section 6 fresource
Impacts to the Historic District have not been documented for Section 106 purposes nor has
the constructive use impacts under Section 4 f been documented
Adverse impacts to the sense of place of the historic downtown along with visual and noise
impacts to the refuge and Riverside Park are anticipated to negatively impact the number of
visitors to both the historic downtown and the refuge which in turn would negatively impact
the economic vitality of Carver s historic core business district
City does not anticipate that selection of Alternative W 2 or C 2 would be beneficial to the
City s future commercial industrial areas west of CSAH 11 Negative impacts on the City are
significantly greater than the positive impacts bestowed by either Alternative W 2 or C 2
City of Carver
Access to US 212
Draft EIS does not include a discussion of the results of the Traffic Report Northwest and
Southwest Carver AUARs
Draft EIS does not include adequate discussion of how a single onoff ramp to access TH 41
under Alternatives W 2 and C 2 would accommodate the anticipated level of development
both in Chaska and Carver
DEIS COMMENT SUMMARY 928 07 16386
Regional Access and Local Accessibility
Section 3 2 2
Local access considerations including the impacts of providing local access to the proposed
Build Alternatives should be addressed to determine whether it is sufficient to accommodate
growth in Chaska near the TH 41ffH 212 interchange
Section 5 1 23 p 5 12
Minor impacts on ease of access to community facilities for residents should be quantified
rather than subjectively noted
Draft EIS does not adequately address the issue of regional trips on the local road system
Draft EIS does not address how either Alternative W 2 or C 2 would impact the ability of the
City of Carver to develop a fully functional system of collector and local streets to support the
regional system
Table 5 4 does not adequately describe actual access impacts
Section 5 1 23 p 5 13
Several local system transportation impacts associated with Alternative W 2 were not
identified local ramps of the New TH 212 CSAH 11 interchange would need to be
reconstructed Forner LaneBade Lane road system that is currently being realigned as a part of
the TH 212 project would need to be realigned and the private drive within Riverbluff Estates
would need to be realigned
The need to realign Spring Creek Drive under Alternatives W 2 and C 2 was not identified
Section 53 2 p 5 31
Draft EIS does not consider access and accessibility issues in adequate detail particularly in
terms of potential impacts to businesses
Inconsistent Assessment of Alternatives
Section 1 10 p 1 11
Given the incomplete status of cultural resources noise and visual quality analyses the
assertion of no unresolved issues is inaccurate
Section 22 4 pp 2 21 and 2 22
The stated need relating to quality of life issues is not uniformly carried through in the
assessment of how specific alternatives would impact quality of life issues within affected
communities
Section 2 243 pp 2 20 and 2 21
There is no reference regarding the City of Carver s position about the proposed river crossing
although Alternative W 2 goes through the city and Alternative C 2 would result in substantial
impacts to Carver residents
Section 5 12 pp 5 7 and 5 9
The assessment of Alternative W 2 either does not include discussion of the following topics or
includes discussion that is less detailed than what is presented for the other Build Alternatives
right of way impact locations impacts to planned developments and an assessment of the
division created between the communities of Carver and Chaska
DEIS COMMENT SUMMARY 928 07 17387
Land Use Issues
Section 1 13 p 1 13
An assessment of land use impacts should be disaggregated by community to determine
impacts to individual communities rather than the overall study area
Table 5 8 should be disaggregated by community to more accurately reflect existing and
planned land uses in the study area
Section 12 0 p 12 1
The following statement is incorrect The proposed project has the potential to change land
use patterns in the study area by increasing visibility of and accessibility to developable land
Alternatives W 2 and C 2 provide only one access ramp to the City of Carver
Cultural Resources
Section 1 13 o 1 14
All cultural resource analyses should be completed and conclusions made before a corridor
location is selected see p 1 14
Section lOA
The historic Railroad Water Tower located in Depot Park will experience a Section 106
adverse effect based on changes to the visual quality resulting from construction of the bridge
under Alternative W 2 this should be considered in terms of the impact to the larger Carver
Historic District
Both Alternatives W 2 and C 2 will permanently change the visual relation between the City of
Chaska and the Minnesota River however in Section lOA the determination of effects on seven
historic properties cannot be made at this time because of uncertainty about noise impacts and
visual effects This seems inconsistent
Visual Impacts
Section 6 5 1 1 2 p 6 47
Landmarks in the City of Carver including the steeple of St Nicholas Church are also visible
from various locations in the river valley
Figure 6 4 and 6 4a 00 6 48 6 50 and 6 53
The location map for View E on page 6 48 indicates that this view looks to the southeast
The view actually looks more toward the northeast toward Chaska rather than the USFWS
refuge
Section 6 5 1 1 2 0 6 51
The description of Riverside Park as a public boat launch underrepresents the importance of
this resource
Portions of the original townsite are above the 750 foot contour including St Nicholas Church
at approximately the 840 foot contour
Section 6 5 1 2 op 6 52 and 6 53
Analysis of the following key views should have been considered entering the City of Carver
on CR 40 from existing TH 212 Riverside Park Depot Park and Renaissance Festival
DEIS COMMENT SUMMARY 928 07 18388
Analysis of visual impacts resulting from Alternative W 2 should include the following
Historic Gateway to Carver Historic Railroad Water Tower St Nicholas Church Carver
Historic District and Riverside Park
Section 6 5 1 3 p 6 56
The three categories used in the analysis omit travelers tourists to the area unless they fall into
the specific categories of riverway users or travelers on the proposed structure
Section 6 5 2 p 6 58
Alternative W 2 would also be visible from the historic gateway to Carver on CR 40 as well as
from portions of the Carver Historic District
Section 6 5 2 p 6 73
No analysis of viewsheds to the touring traveling public along CR 40 and in historic Carver and
Riverside Park has been documented In these areas the touring public has views of natural
riverway corridors and a historic community that would be adversely impacted by the
imposition of Alternative W 2 into the landscape
Section 6 53 p 6 74
Locations that are assumed to have at least apartially obstructed view of Alternative W 2 are
likely to have little to no obstruction because of the clearing involved in the construction of the
MCES interceptor in the valley near CR 40
Section 104 p 10 18
If a determination of effect on the Carver Historic District cannot be made at this time why is
Alternative W 2 being recommended
In addition to uncertain noise impacts Alternative W 2 would have a visual impact on the
Carver Historic District
Noise
Section 6 2 2 1 The text comparing 2040 noise levels under No Build and Alternative W 2 does not
adequately represent the results of the models presented in Tables 6 4A and 6 5A The actual results
are not mixed Only one receptor experiences a decrease in noise levels with a difference of 1
The number of receptors in Carver in 2040 that were modeled is extremely low due to the
characterization of several existing residential parcels as agricultural
Sufficient noise analysis should be completed to determine the impacts to the remaining 35
units in Riverbluff Estates
Section 6 24 p 6 37
For any existing subdivisions noise mitigation from Alternatives W 2 or C 2 should be
planned as part of this project
Parks Public Lands Trails Natural Resources
Section 5 12 1 p 5 8
Impacts to the City of Carver s bicycle pedestrian trails were not included in the community
cohesion discussion for Alternative W 2 as they were included in other alternatives
The trail in Spring Creek is within Alternative C 2
DEIS COMMENT SUMMARY 928 07 19389
Section 74 2 p 7 49
The steep slope analysis for Alternative W 2 appears to be incorrect There are two areas of
highly erodible soils in the City of Carver that are traversed by Alternative W 2
Figure 8 1 p 8 2
The boundary for the USFWS does not include all of their parcels Acreage calculations should
be verified
Section 8
Because of the proximity of Alternative W 2 the constructive use of Riverside Park will be
substantially impacted and the City of Carver believes that Section 4 0 applies
The impact on the constructive use of non directly impacted land in the USFWS property was
not estimated
Section 4 0 6 0 analysis did not adequately address the constructive use impacts on Depot
Park
Section 8 and Appendix B
Carver s Historic District as well as the traditional gateway to Carver along CR 40 would be
substantially impaired by the proximity of Alternative W 2
The unique sense of place that is present in this out of the way community would be
substantially impaired by Alternative W 2 dominating the historic gateway to Carver and the
visual skyline of the historic settlement
Section 82 2 1 p 8 12
Acreage calculation for the MNVWR may be incorrect as the boundary for the refuge shown
on the maps is incorrect
MVNWR is a Section 6 0 property
Environmental consequences do not address constructive use of Riverside Park Depot Park
the Carver Historic District and remaining portions of MVNWR
The assumption that Alternative W 2 will allow for grade separation of the trail in Riverbluff
Estates and will avoid other existing and future trails in the study area is incorrect it would
require the realignment of the trail along Spring Creek Drive and would impact the future trails
the City of Carver has planned alongnear existing TH 212
Section 82 2 2 p 8 13
Alternative C 2 would require the realignment of the City of Carver trail along Spring Creek
Drive
Figure 9 1 p 9 2
The Chaska Creek watershed is mislabeled as Carver Creek
Section 9 1 3 2 p 9 16
In the discussion regarding Alternative W 2 the interchange has the potential to cross the
Chaska Creek watershed not the Carver Creek watershed
Errors in Right of Way Needs Calculations
Realignment for Spring Creek Drive for Alternatives W 2 and C 2 will result in additional
acquisition and construction costs
DEIS COMMENT SUMMARY 928 07 20390
Alternative W 2
Draft EIS identifies a total of 13 residential acquisitions which is incorrect An e mail from
Nancy Frick SRF on July 26 2007 identified ten additional units which should be added as a
total take from Carver s Spring Creek neighborhood
The City estimates that three units from the Grove at Spring Creek may need to be taken for
realignment of Spring Creek Drive
Draft EIS should examine the possibility of acquiring all 42 townhome units in Riverbluff
Estates due to topographical constraints and difficulty in mitigating noise for remaining units
Alternative C 2
Draft EIS identifies a total of 29 residential acquisitions which is incorrect An e mail from
Nancy Frick SRF on July 26 2007 identified eight additional units which should be added as
a total take from Carver s Spring Creek neighborhood
The City estimates that three lots from the Grove at Spring Creek may need to be taken for the
realignment of Spring Creek Drive
Section 5 1 2 1 and Table 5 7 p 5 23
The text in Section 5 1 2 1 identifies the need to acquire 12 and 24 units in the Jackson Heights
mobile home park for C 2 and C 2A respectively while Table 5 7 identifies 18 and 38 units
Similar internal inconsistencies for Bonnevista and Riverview Terrace were also noted
Right of way acquisition costs for the E alternatives should be adjusted to reflect removal of
any Mobile Manor properties that would be acquired for the Highway 169 project
Table 5 10 p 5 29 n 6
Are the seven parcels the townhome units in Riverbluff Estates If so they should be classified
as residential and should be moved to the residential category
Table 5 13 p5 32
Should be updated with additional property acquisitions for Alternative W 2 and C 2 and the
changes carried forward to the estimated tax loss from properties within the City of Carver
Section 7 12 p 7 19
Per subsequent correspondence with SRF it appears that far less than 17 8 acres of property
need to be acquired from the Spring Creek development which should reduce the 11 2 acres of
Maple Basswood Forest to 0 acres for Alternative C 2 Tables 7 1 to 7 6 and related discussion
and conclusions should also be updated accordingly
Wellhead Protection Areas
Section 9 14 p 9 18
The City of Carver has been working with the Minnesota Department of Health to complete a
Wellhead Protection Plan
Section 9 22 p 9 19
In Carver County Alternative W 2 lies mainly within the Minnesota River watershed not the
Carver Creek sub watershed
Figure 9 11 p 9 22
DEIS COMMENT SUMMARY 9128 07 21391
Figure should be updated to include the wellhead protection area for the City of Carver
Section 94 1 p 9 29
Last paragraph should be updated to provide a description of the Carver wellhead protection
areas
Indirect Impacts
Section 123 p 12 18
Draft EIS did not analyze the impacts of the alternatives on commercial areas that rely upon
tourist traffic for their vitality specifically Carver s Historic District
Draft EIS did not discuss the economic impact of the various Build Alternatives on
developments that are under construction but located within a Build Alternative
Section 13 1 3 2 p 13 4 Several items in this section can be updated as follows
Spring Creek is under construction The majority of the infrastructure is completed and
Centex has been regularly pulling building permits
Replace City of Carver AUAR with Parks at Harmony
Carver Commons southwest quadrant of the TH 212 CSAH 11 interchange a mixed use
development currently in the planning stage
Christy s Bluff south of Forner Lane a residential development of approximately 25 units
The land is in the platting stage
Grove at Spring Creek and Spring Creek Woods south of existing TH 212 and east of Spring
Creek a residential development of approximately 150 units currently in the planning stages
Section 13 3 1 2 p 13 6
Several properties classified as agricultural for Alternatives W 2 and C 2 are currently under
construction as residential and should be reclassified accordiIigly
Section 13 3 22 p 13 8
The number of residential units impacted by the Build Alternatives should be updated
Section 13 34 4 p 13 11
This project is not consistent with the City of Carver s Comprehensive Plan i e the proposed
project is not consistent with Carver s vision
Section 13 3 5 1 p 13 11
The City of Carver uses Carver County s 2000 natural resources inventory and has adopted
regulations that protect natural resources including a bluff ordinance and a tree preservation
and reforestation ordinance
Section 133 52 p 13 12
It is our opinion that the maple basswood forest that was identified as being impacted under
Alternative C 2 is the one located in Spring Creek and will not be impacted based on
information provide by MnDOT subsequent to the release of the Draft EIS
Section 133 9 2 p 13 19
This section does not discuss increases to the edge habitat or constructive use of the MVNWR
DEIS COMMENT SUMMARY 9 28 07 22392
It should be noted that much of the Minnesota River watershed in Carver does not discharge
directly to the river via the refuge rather it discharges to Spring Creek which discharges
directly into the Minnesota River
Section 13 3 11
This section does not include the direct impacts that would occur to City of Carver trails under
with Alternative W 2 or C 2 nor the indirect impacts visual and noise that would occur to
Riverside Park and Depot Park from Alternative W 2
Section 14 1 1 p 14 1
Residential unit acquisitions should be updated
General Comments
Section 2 2 1 2 1 p 2 7
Union Pacific spur line through Carver and Chaska is in the process of being abandoned
Table 6 12 p 6 42
Near both Alternatives W 2 and C 2 there is an existing property with a storage tank release
located south of existing TH 212 and west ofMt Hope Road The MPCA Site ID number is
LEAKOOO 16349
Section 65 1 2 p 6 53 Alternative W 2
Development is pending on land immediately south of Forner Lane adjacent to the Alternative
W 2 corridor with a plat known as Christy s Bluff
Development east and north of the Skyview neighborhood is Riverbluff Estates which is the
townhome development adjacent to CR 40
Figure 6 5 p 6 59
In the vicinity of the CSAH IlffH 212 interchange most of the road features appear to be
shifted to the north and west This should be corrected
Section 11 2 1
Alternatives W 2 and C 2 may also cause access impacts in the City of Carver near Spring
Creek Drive
Section 11 22 p 11 3
The MVSRA is also impacted by Alternative W 2
Unsubstantiated Text
DEIS does not backup its assertions regarding congestion on various river crossings e g
Highway 101 US 169 I 35W with documentation of these conditions
Section 2 2 2 2 p 2 12
Overall information presented to qualify the need for the project based on public safety needs
contains gratuitous language that while possibly true is not substantiated by reference to
established emergency medical services medical standards
Please provide a discussion of what is considered acceptable and unacceptable by those in the
EMS and medical fields
DEIS COMMENT SUMMARY 928 07 23393
Section 2 24 1 1 ll 2 15
Without documentation statements regarding crash and severity rates are unverifiable and
provide little value towards documenting project needs
Section 2 243 2 p 2 19
Please provide information regarding the Metropolitan Council s position regarding the
location of the proposed project
Section 23
A LOS threshold is not defined therefore it is unclear to the reader as to why the TH 41 LOS
is below the acceptable LOS
Section 4 1 1 p 4 1
Please provide information regarding the modified version of the travel demand models or
information about where the modifications are documented
Section 4 13 ll 4 13
Please provide additional information about how the numbers of hours of congestion were
calculated
Section 43 1 pp 4 17 and 4 18
There is not enough supporting data to confirm any of the results reported in Table 4 7
u s Fish and Wildlife Service
Information provided in the DEIS particularly with respect to noise and fragmentation of
habitats is insufficient to allow for an accurate determination of the extent of such impacts for
each alternative
Recommends that a supplemental DEIS be prepared to provide a thorough analysis of noise
impacts and fragmentation impacts associated with each of the al ternati ves
Alternative Preference
USFWS and MnDNR have concluded that Alternative C 2 would be the least environmentally
damaging alternative
The impacts of Alignments C 2A and W 2 are incompatible with the goals of the Refuge and
USFWS find these unacceptable
USFWS does not support selection of any of the eastern alternatives due to significant habitat
fragmentation and wetland impacts
Noise
A supplemental DEIS should be prepared to provide a thorough analysis of noise impacts
associated with each of the alternatives
The analysis should identify the potential zone of influence by conducting a noise study that
will provide a contour prediction graphic for each of the alternative alignments in the study
area
A detailed analysis of the effects of traffic noise on wildlife for each of the proposed
alternatives as well as possible mitigation measures should also be included
DEIS COMMENT SUMMARY 928 07 24394
For each alternative analysis should identify the effects from noise on Valley visitors and
possible mitigation measures to address these effects
Habitat Fragmentation
The area of negative influence would be larger than the quantities listed in Table 7 6 because
much of the land in the Valley is in various stages of succession and has been degraded in the
past resource managers base their landscape management plans on the future vegetative
community expected rather than on what may be present at any given time during the
restoration process
Visual Impacts
The potential exists to have a natural screen over time depending on the bridge design criteria
Are the bridge heights the minimum heights required in order to meet the design criteria If so
the EIS should confirm this
Light Pollution
Project plans should fully address the problematic impacts of artificial lighting and provide
appropriate measures to avoid minimize and mitigate these impacts
Threatened and Endangered Species
Citations should be included for statements that reference surveys conducted for species in the
analysis area i e survey sponsor time of survey location of results etc
Invasive Species
DEIS should provide a more thorough analysis of adverse impacts to Valley resources from
invasive species that do become established over time
Wild and Scenic Rivers
Section 75 3 implies that there would be no impacts to the free flowing condition of the river
other than piers in the river and that canoeing and fishing would not be impacted
NPS disagrees with this statement as the addition of piers where presently there are none has
the potential for serious impacts to the free flowing condition ofthe river and impacts from
construction on tributaries away from the bed and banks of the listed river can also impact the
free flow of water in the river
Recommends the discussion of impacts to the free flowing condition of the Minnesota River be
improved by including possible engineering constraints that may allow or prevent spanning the
river with a bridge regardless of which alternative is selected
Contaminants Trash and Hazardous Material Spills
The stormwater treatment plan should address not only water volume collected by the system
but also treatment of the full range of contaminants carried by impervious surface runoff
A monitoring plan should be developed for the preferred alternative to assess changes from
baseline conditions in any area where such impacts are expected to affect wetlands
No runoff impacts are acceptable for the unique resources of Seminary Fen
Cumulative Impacts
The statement made in section 133 94 first sentence second paragraph which states the
size of impact from the proposed project in relation to the overall size of MVNWR is relatively
DEIS COMMENT SUMMARY 928 07 25395
small is incorrect when consideration is given to the substantial acreage adjacent to the
crossing that would be severely impacted by noise and habitat fragmentation
We disagree with the statement in section 13 33 last sentence second paragraph which states
traffic noise levels are generally localized and tend to disburse overrelatively short
distances Construction of any of the Build Alternatives would result in an increase of LIO
noise levels ranging from 22 dBA to 32dBA over existing conditions in isolated areas currently
not exposed to traffic noise This is a substantial increase in the audibility of noise from the
existing background levels in such areas
Proposed Mitigation
The USGS expresses concern that the mitigation measures identified in the DEIS for impacts to
wildlife seem to be very general
For threatened endangered and special concern species the mitigation measures identified in
the DEIS seem to be very general
Section 4 0 Evaluation
We note that the DEIS does not select a preferred alternative and the Section 4 f evaluation
does not select an alternative that results in the least overall harm
Based on the information contained in the DEIS and this evaluation and other factors presented
in these comments the Department would not concur with a determination that there is no
feasible and prudent alternative which would avoid impacts to Section 4 f properties
We would like to review the signed programmatic agreement with SHPO in order to better
understand the recommendations for mitigation
The summary of impacts on 4 f resources provided in Table B 1 appears to only consider the
acres of each resource that would be directly used for each alternative These impacts should
include the acreage on which increased levels of noise may substantially impair major
attributes of the Refuge
It is unclear from the information provided on pages 6 12 and 6 13 of the DEIS which noise
standard should be applied in determining substantial impairment
The Refuge lands particularly those areas that are relatively remote and presently not impacted
by high noise levels should be considered noise sensitive lands Le Federal Land Use
Category A lands
Construction of any of the Build Alternatives would result in an increase of LIO noise levels of
more than 20 dBA over existing conditions in remote areas of the Valley that presently
experience low background noise levels this is a noise impact as defined by FHW A
Department is concerned that the degree of impacts to MVNWR and MVSRA is not properly
considered in the analysis
We recommend that MnlDOT and FHW A coordinate closely with USFWS Refuge staff to
determine the amount of Refuge land potentially subject to indirect impacts such as increased
noise levels and habitat fragmentation
Section 6 0 Evaluation
We recommend you consult with the L WCF program administrator in Minnesota Wayne
Sames at the MnDNR
Army Corps of Engineers
Alternative C 2 appears to be the most acceptable alternative
DEIS COMMENT SUMMARY 9 28 07 26396
Evaluation of project impacts for Alternative C 2 would include the impact to the flood control
project
Locations where new roads cross any of the designed flood control features should be
examined carefully to ascertain potential impacts
Lower Minnesota River Watershed District
LMRWD cannot support any of the proposed Build Alternatives but wishes to convey its
strong opposition to the three eastern alternatives
DEIS does not provide detailed information on mitigation of impacts to Seminary Fen from the
eastern alternatives
DEIS does not provide detailed information on proposed mitigation of wetland impacts
LMRWD is concerned that road building activities may be deleterious of Assumption Creek
given that the DEIS does not appear to assess the potential need for fill of or excavation in the
creek
Impacts to Seminary Fen are likely to result in violation of environmental quality standards
actionable under Minnesota Environmental Rights Act MERA
Given the nature of the two tiered EIS process LMRWD remains unconvinced that adequate
mitigation measures can be developed and planned for protection of Seminary Fen and other
critical natural resources
H Projects 6179EPDEIS Public and Agency CommentPublic Hearing Summary Revised 092807 doc
DEIS COMMENT SUMMARY 928 07 27397
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
WINI ci chanhassen mn us
MEMORANDUM
TO Mayor and City Council
FROM Greg Sticha Finance Director
DA TE October 22 2007
SUBJ 2007 Budget vs Actual Revenue Expenditure Reports
The attached reports provide a look at the budget versus actual revenue and
expenditures for the city s general fund through September of 2007
Most expense line items are either on or below budget at this point of the year
We have paid the assessment contract for the year so there will be no additional
payments on this line item The City Hall Maintenance budget includes some
insurance line items that have not been allocated to other departments at
this point
Revenue items are on par with budget with the exception of building permit
We are estimating that we will be about 100 000 below budget on building
permit revenues as discussed at the budget work sessions in August We did
receive 150 000 in SAC retainage fees related to the elimination of the
Lakeview Hills development which should offset any losses from building
permit revenues
Based on some of these early projections we are anticipating there will be very
little surplus in the general fund at the end of 2007 unlike each of the last few
years
If you have any questions regarding these numbers feel free to email or call me
at your convenience
The City 01 Chanhassen A growing community with clean lakes quality schools a chanming downtown thriving businesses winding trails and beautiful parks A great place to live work and play398
General Ledger
Expense Budget vs Actual
Period 01 09
Fiscal Year 2007 2007
2007 2007 2007 2007
Description Budget Actual Dollars Unspent Unspent
CITY COUNCIL 123400 00 99 961 66 23438 34 18 99
ADMINISTRATION 438 000 00 305 008 12 132 991 88 30 36
FINANCE 318 000 00 220 80744 97 192 56 30 56
LEGAL 168 000 00 100 54745 67452 55 40 15
PROPERTY ASSESSMENT 100 100 00 101 380 14 1 280 14 1 28
MANAGEMENT INFORMATION SYSTEMS 281 200 00 164457 60 116 74240 41 52
CITY HALL MAINTENANCE 428 600 00 439 85848 11 25848 2 63
ELECTIONS 19 700 00 19 700 00 100 00
LIBRARY BUILDING 102 200 00 92406 67 9 793 33 9 58
GENERAL GOVERNMENT 1 979 200 00 1 524427 56 454 77244 22 98
POLICE CARVER CO CONTRACT 1 333 700 00 688 254 18 645445 82 4840
FIRE PREVENTION ADMIN 678 600 00 334 741 81 343 858 19 50 67
CODE ENFORCEMENT 756 100 00 465 374 89 290 725 11 3845
AMINAL CONTROL 69 200 00 53 942 52 15 25748 22 05
LAW ENFORCEMENT 2 837 600 00 1 542 31340 1 295 286 60 45 65
ENGINEERING 528400 00 383 797 53 144 60247 27 37
STREET MAINTENANCE 786 500 00 545 525 17 240 974 83 30 64
STREET LIGHTING SIGNALS 314 900 00 214 31943 100 580 57 31 94
CITY GARAGE 459 600 00 310 064 78 149 535 22 32 54
PUBLIC WORKS 2 089400 00 1453 706 91 635 693 09 3042
PLANNING COMMISSION 4 200 00 3 049 84 1 150 16 27 38
PLANNING ADMINISTRATION 377 600 00 299 507 23 78 092 77 20 68
SENIOR FACILITY COMMISSION 30 100 00 18 54045 11 559 55 3840
COMMUNITY DEVELOPMENT 411 900 00 321 097 52 90 80248 22 04
PARK COMMISSION 2 200 00 1 091 36 1 108 64 50 39
PARK ADMINISTRATION 123 500 00 88 189 24 35 310 76 28 59
RECREATION CENTER 269 100 00 176 696 36 92403 64 34 34
LAKE ANN PARK 71 800 00 57 261 04 14 538 96 20 25
PARK MAINTENANCE 819 600 00 626 732 74 192 867 26 23 53
SENIOR CITIZENS CENTER 52400 00 38492 98 13 907 02 26 54
RECREATION PROGRAMS 274 200 00 214 558 72 59 641 28 21 75
SELF SUPPORTING PROGRAMS 131 500 00 77 069 53 54430 47 41 39
PARK RECREATION 1 744 300 00 1 280 091 97 464 208 03 26 61
TRANSFERS 273 720 00 273 720 00
GRAND TOTAL 9 062400 00 6 395 357 36 2 667 042 64 2943
399
General Ledger
Revenue Budget vs Actual CITY OF
CII1NIJ8SENUserdanielle
Printed 10 04 07 14 37 04
Period 01 09
Fiscal Year 2007 2007
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unpsent Unspent
Revenue
101 0000 3002 Allowance for Delinquents 320 000 00 0 00 320 000 00 100 00
101 0000 3010 Current Property Tax 6 558 100 00 3 237 836 67 3 320 263 33 50 63
101 0000 3011 Delinquent Property Tax 50 000 00 87 302 54 37 30254 74 61
0000 6 288 100 00 3 325 139 21 2 962 960 79 4712
Grand Total 6 288 100 00 3 325 139 21 2 962 960 79 4712
PROPERTY TAXES 6 288 100 00 3 325 139 21 2 962 960 79 47 12
101 0000 3205 Dog or Cat 0 00 0 00 0 00 0 00
0000 0 00 0 00 0 00 0 00
101 1120 3284 Garbage Hauler 3 000 00 1 800 00 1 200 00 40 00
1120 ADMINISTRATION 3 000 00 1 800 00 1 200 00 40 00
101 1210 3213 Solicitor 500 00 275 00 225 00 45 00
101 1210 3226 Liquor On and Off Sale 84 000 00 84 930 00 930 00 111
1210 POLICE CARVER CO CONTRACT 84 500 00 85 205 00 705 00 0 83
101 1250 3230 Rental Housing License 15 000 00 24 250 00 9 250 00 6167
1250 CODE ENFORCEMENT 15 000 00 24 250 00 9 250 00 6167
101 1260 3203 Dog Kennel 500 00 546 50 4650 9 30
101 1260 3205 Dog or Cat 4 500 00 4 873 25 373 25 8 29
1260 AMINAL CONTROL 5 000 00 5419 75 419 75 840
Grand Total 107 500 00 116 674 75 9 174 75 8 53
LICENSES 107 500 00 116 674 75 9 174 75 8 53
101 0000 3301 Building 0 00 0 00 0 00 0 00
101 0000 3309 Fire Suppression 0 00 0 00 0 00 0 00
0000 0 00 0 00 0 00 0 00
10 1 1210 3308 Gun 1 000 00 410 00 590 00 59 00
1210 POLICE CARVER CO CONTRACT 1 000 00 410 00 590 00 59 00
101 1220 3309 Fire Suppression 14 000 00 14 97157 971 57 6 94
101 1220 3331 Firework s Application Fee 0 00 400 00 400 00 0 00
1220 FIRE PREVENTION ADMIN 14 000 00 15 371 57 1 37157 9 80
101 1250 3301 Building 825 000 00 589 032 91 235 967 09 28 60
101 1250 3302 Plan Check 330 000 00 329 399 58 60042 018
101 1250 3305 Heating AlC 120 000 00 99 769 22 20 230 78 16 86
101 1250 3306 Plumbing 85 000 00 118 446 32 33446 32 3935
101 1250 3330 Elec Permit App Forms 0 00 36 00 36 00 0 00
101 1250 3390 Miscellaneous Permits 100 00 380 00 280 00 280 00
1250 CODE ENFORCEMENT 1 360 100 00 1 137 064 03 223 035 97 1640
101 1260 3320 Stable 300 00 190 00 110 00 36 67
1260 AMINAL CONTROL 300 00 190 00 110 00 36 67
101 1310 3307 Trenching 35 000 00 14 209 70 20 79030 5940
101 1310 3390 Miscellaneous Permits 850 00 1 145 00 295 00 34 71
1310 ENGINEERING 35 850 00 15 354 70 20495 30 57 17
101 1420 3311 Sign 6 500 00 7 070 00 570 00 8 77
101 1420 3390 Miscellaneous Permits 50 00 50 00 0 00 0 00
1420 PLANNING ADMINISTRATION 6 550 00 7 120 00 570 00 8 70
Grand Total 1417 800 00 1 175 510 30 242 289 70 17 09
PERMITS 1 417 800 00 1 175 510 30 242 289 70 17 09
101 1210 3401 Traffic Ordinance Violation 130 000 00 79 890 34 50 109 66 3855
1
400
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unpsent Unspent
101 1210 3405 Other Fines and Penalties 0 00 3 009 73 3 009 73 0 00
1210 POLICE CARVER CO CONTRACT I30 000 00 82 900 07 47 099 93 36 23
101 1260 3402 Vehicle Lock Out 2 500 00 1450 00 1 050 00 42 00
101 1260 3404 Dog or Cat Impound 4 000 00 4 880 71 880 71 22 02
1260 AMINAL CONTROL 6 500 00 6 330 71 169 29 2 60
Grand Total 136 500 00 89 230 78 47 269 22 34 63
ANES PENALTIES 136 500 00 89 230 78 47 269 22 34 63
101 0000 3509 Other Shared Taxes 20 000 00 9 733 50 10 26650 5133
0000 20 000 00 9 73350 10 266 50 5133
101 1210 3510 State Grants 40 000 00 0 00 40 000 00 100 00
1210 POLICE CARVER CO CONTRACT 40 000 00 0 00 40 000 00 100 00
101 1220 3509 Other Shared Taxes 145 000 00 0 00 145 000 00 100 00
1220 ARE PREVENTION ADMIN 145 000 00 0 00 145 000 00 100 00
Grand Total 205 000 00 9 733 50 195 266 50 95 25
INTERGOVERNMENTAL REVENUES 205 000 00 9 733 50 195 266 50 95 25
101 0000 3602 Variance Cond Use Permits 0 00 0 00 0 00 0 00
0000 0 00 0 00 0 00 0 00
101 1120 3601 Sale of Documents 250 00 0 00 250 00 100 00
101 1120 3651 Merchandise Sales 0 00 345 00 345 00 0 00
101 1120 3670 Internment Fee 0 00 50 00 50 00 0 00
1120 ADMINISTRATION 250 00 395 00 145 00 58 00
101 1130 3604 Assessment Search 500 00 765 00 265 00 53 00
101 11 30 3619 Investment Mgmt Fee 75 000 00 0 00 75 000 00 100 00
1130 FINANCE 75 500 00 765 00 74 735 00 98 99
101 1170 3613 Misc General Government 2 000 00 1496 90 503 10 2516
1170 CITY HALL MAINTENANCE 2 000 00 1496 90 503 10 2516
101 11 90 3638 Food Concessions 1 500 00 1 059 78 440 22 29 35
1190 LIBRARY BUILDING 1 500 00 1 059 78 440 22 29 35
101 1210 3629 MiSC Public Safety 2 000 00 2 886 69 886 69 443 3
1210 POLICE CARVER CO CONTRACT 2 000 00 2 886 69 886 69 44 33
101 1310 3601 Sale of Documents 3 600 00 571 38 3 028 62 8413
101 1310 3605 Plat Recording Fees 7 500 00 2 306 00 5 194 00 69 25
101 1310 3614 Construction Admin Fee I20 000 00 21 110 01 98 889 99 824 I
101 1310 3617 Engineering General 1 000 00 0 00 1 000 00 100 00
101 1310 3629 MiSC Public Safety 2 000 00 2 392 00 392 00 19 60
1310 ENGINEERING 134 100 00 26 379 39 107 720 61 80 33
101 1350 3649 Misc Public Works 5 000 00 2 700 00 2 300 00 46 00
1350 STREET LIGHTING SIGNALS 5 000 00 2 700 00 2 300 00 46 00
101 1420 3601 Sale of Documents 150 00 155 00 5 00 3 33
101 1420 3602 Variance Cond Use Permits 45 000 00 19 615 00 25 385 00 5641
101 1420 3603 Rezoning 2 000 00 0 00 2 000 00 100 00
101 1420 3605 Plat Recording Fees 2 500 00 2 824 00 324 00 12 96
101 1420 3613 Misc General Government 8 000 00 2409 00 5 591 00 69 89
1420 PLANNING ADMINISTRATION 57 650 00 25 003 00 32 647 00 5663
101 1530 363 I Recreation Center Operations 3 500 00 374 23 3 125 77 89 31
101 1530 3638 Food concessions 0 00 1 314 30 1 31430 0 00
1530 RECREATION CENTER 3 500 00 1 688 53 1 811 47 5176
101 1531 3631 Recreation Center Operations 23 000 00 17 065 74 5 934 26 25 80
1531 ROOM RENTAL 23 000 00 17 065 74 5 934 26 25 80
101 1532 3630 Recreation Program Fees 0 00 0 00 0 00 0 00
101 1532 3631 Recreation Center Operations 50 000 00 20 904 81 29 09519 581 9
101 1532 3632 Fitness No Tax 9 000 00 2 732 65 6 267 35 69 64
1532 FITNESS 59 000 00 23 63746 35 362 54 59 94
101 1533 3631 Recreation Center Operations 500 00 97 50 402 50 80 50
1533 PERSONAL TRAINING 500 00 9750 402 50 80 50
101 1534 3631 Recreation Center Operations 58 000 00 46 708 62 11 291 38 1947
2
401
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unpsent Unspent
101 1534 3636 Self Supporting Programs 0 00 0 00 0 00 0 00
1534 DANCE 58 000 00 46 708 62 11 29138 1947
101 1535 3631 Recreation Center Operations 0 00 3 845 00 3 845 00 0 00
1535 DANCE COSTUMES 0 00 3 845 00 3 845 00 0 00
101 1540 3635 Watercraft Rental 4 000 00 3 445 65 554 35 13 86
101 1540 3638 Food Concessions 10 500 00 10 069 95 430 05 4 10
1540 LAKE ANN PARK 14 500 00 13 515 60 98440 6 79
101 1541 3634 Park Facility Usage Fee 12 000 00 9 035 94 2 964 06 24 70
1541 PICNICS 12 000 00 9 035 94 2 964 06 24 70
101 1545 3633 Equipment Rental 200 00 7847 121 53 60 77
1545 VOLLEYBALL KIT RENTAL 200 00 7847 121 53 60 77
101 1546 3639 Misc Park Rec 800 00 900 00 100 00 12 50
1546 CANOE RACK RENTAL 800 00 900 00 100 00 12 50
101 1560 3637 Senior Programs 30 000 00 23 87195 6 128 05 2043
1560 SENIOR CITIZENS CENTER 30 000 00 23 87195 6 128 05 2043
101 1600 3630 Recreation Program Fees 0 00 050 0 50 0 00
101 1600 3636 Self Supporting Programs 0 00 0 00 0 00 0 00
101 1600 3651 Merchandise sales 0 00 82 55 8255 0 00
1600 RECREATION PROGRAMS 0 00 82 05 82 05 0 00
101 1611 3630 Recreation Program Fees 5 000 00 4 093 74 906 26 1813
101 1611 3636 Self Supporting Programs 0 00 0 00 0 00 0 00
1611 FEBRUARY FESTIVAL 5 000 00 4 093 74 906 26 1813
101 1613 3630 Recreation Program Fees 6400 00 9 661 50 3 261 50 50 96
101 1613 3636 Self Supporting Programs 0 00 0 00 0 00 0 00
101 1613 3651 Merchandise Sales 0 00 465 00 465 00 0 00
1613 FOURTH OF JULY 6400 00 10 126 50 3 72650 58 23
101 1614 3630 Recreation Program Fees 3 000 00 7 70 2 99230 99 74
1614 HALLOWEEN PARTY 3 000 00 7 70 2 992 30 99 74
101 1616 3630 Recreation Program Fees 18 000 00 16 191 35 1 808 65 10 05
101 1616 3636 Self Supporting Programs 0 00 0 00 0 00 0 00
1616 SUMMER PLAYGROUND 18 000 00 16 191 35 1 808 65 10 05
101 1618 3630 Recreation Program Fees 0 00 220 82 220 82 0 00
1618 MINI CARNIVAL 0 00 220 82 220 82 0 00
101 1710 3636 Self Supporting Programs 36 000 00 41 81748 5 81748 1616
1710 PRESCHOOL SPORTS 36 000 00 41 81748 5 81748 1616
101 1711 3636 Self Supporting Programs 1 600 00 662 65 93735 5858
1711 PRESCHOOL ACTIVITIES 1 600 00 662 65 937 35 5858
101 1730 3636 Self Supporting Programs 28 000 00 8 024 68 19 97532 7134
1730 YOUTH SPORTS 28 000 00 8 024 68 19 975 32 7134
101 1731 3636 Self Supporting Programs 50 000 00 37 150 82 12 84918 25 70
1731 YOUTH ACTIVITIES 50 000 00 37 150 82 12 84918 25 70
101 1760 3636 Self Supporting Programs 0 00 40 00 40 00 0 00
1760 ADULT SPORTS 0 00 40 00 40 00 0 00
101 1761 3636 Self Supporting Programs 8 500 00 8 159 11 340 89 4 01
1761 ADULT ACTIVITIES 8 500 00 8 159 11 340 89 4 01
101 1763 3636 Self Supporting Programs 650 00 126 88 52312 8048
1763 SPRING 3 0N 3 BASKETBALL 650 00 126 88 523 12 8048
101 1764 3636 Self Supporting Programs 1450 00 747 21 702 79 4847
1764 WINTER 3 0N 3 BASKETBALL 1450 00 747 21 702 79 4847
101 1766 3636 Self Supporting Programs 19 200 00 18 606 27 593 73 3 09
1766 SUMMER SOFTBALL 19 200 00 18 606 27 593 73 3 09
101 1767 3636 Self Supporting Programs 3 200 00 5 169 31 1 96931 6154
1767 FALL SOFTBALL 3 200 00 5 169 31 1 96931 6154
Grand Total 660 500 00 352 35714 308 142 86 46 65
CHARGES FOR SERVICES 660 500 00 352 357 14 308 142 86 46 65
101 0000 3801 Bank Interest Earnings 70 000 00 0 00 70 000 00 100 00
3
402
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unpsent Unspent
101 0000 3803 Building Rental 0 00 0 00 0 00 0 00
101 0000 3807 Donations 5 000 00 0 00 5 000 00 100 00
101 0000 3812 Contractor Verification 0 00 0 00 0 00 0 00
10 1 0000 3903 RefundslReimbursements 0 00 0 00 0 00 0 00
101 0000 3910 Miscellaneous Revenue 0 00 38345 38345 0 00
0000 75 000 00 38345 74 61655 9949
101 1110 3903 RefundslReimbursements 0 00 14 25 14 25 0 00
1110 CITY COUNCIL 0 00 14 25 14 25 0 00
101 1120 3802 Equipment Rental Sale 110 000 00 86452 25 23 547 75 2141
101 1120 3804 Land Sale 0 00 1 800 00 1 800 00 0 00
101 1120 3903 RefundslReimbursements 500 00 3 678 50 3 178 50 635 70
1120 ADMINISTRATION 110 500 00 91 930 75 18 569 25 16 80
101 1130 3820 Misc Other Revenue 5 000 00 135 00 4 865 00 97 30
101 1130 3829 InterestPenalty 500 00 0 00 500 00 100 00
101 1130 3903 RefundslReimbursements 5 000 00 394 64 4 605 36 9211
101 1130 3980 Cash Short Over 0 00 745 745 0 00
1130 FINANCE 10 500 00 537 09 9 962 91 94 88
101 1140 3808 Insurance Reimbursements 0 00 0 00 0 00 0 00
1140 LEGAL 0 00 0 00 0 00 0 00
101 1170 3803 Building Rental 0 00 3 170 00 3 170 00 0 00
101 1170 3808 Insurance Reimbursements 5 000 00 0 00 5 000 00 100 00
101 1170 3903 RefundslReimbursements 600 00 330 00 270 00 45 00
1170 CITY HALL MAINTENANCE 5 600 00 3 500 00 2 100 00 37 50
101 1190 3803 Building Rental 0 00 0 00 0 00 0 00
1190 LIBRARY BUILDING 0 00 0 00 0 00 0 00
101 1210 3807 Donations 2 000 00 684 97 2 684 97 134 25
101 1210 3903 RefundslReimbursements 0 00 0 00 0 00 0 00
1210 POLICE CARVER CO CONTRACT 2 000 00 684 97 2 684 97 134 25
101 1220 3807 Donations 0 00 500 00 500 00 0 00
101 1220 3903 RefundslReimbursements 2 500 00 0 00 2 500 00 100 00
1220 FIRE PREVENTION ADMIN 2 500 00 500 00 2 000 00 80 00
101 1250 3812 Contractor Verification 0 00 5 00 5 00 0 00
101 1250 3816 SAC Retainer 5 000 00 159406 75 154406 75 3 088 14
101 1250 3818 Sur Tax Retainer 1 500 00 758 26 741 74 4945
101 1250 3903 RefundslReimbursements 1 500 00 1 152 72 347 28 2315
101 1250 3980 Cash Short Over 0 00 040 040 0 00
1250 CODE ENFORCEMENT 8 000 00 161 322 33 153 322 33 1 91653
101 1260 3903 RefundslReimbursements 0 00 14 23 14 23 0 00
1260 AMINAL CONTROL 0 00 14 23 14 23 0 00
101 1310 3903 RefundslReimbursements 500 00 25 00 475 00 95 00
1310 ENGINEERING 500 00 25 00 475 00 95 00
101 1320 3903 RefundslReimbursements 1 250 00 252 82 997 18 79 77
101 1320 3910 Miscellaneous Revenue 0 00 200 00 200 00 0 00
1320 STREET MAINTENANCE 1 250 00 452 82 79718 63 77
101 1350 3903 RefundslReimbursements 11 000 00 532 51 10467 49 9516
1350 STREET LIGHTING SIGNALS 11 000 00 53251 10467 49 9516
101 1370 3903 RefundslReimbursements 700 00 206 25 493 75 70 54
1370 CITY GARAGE 700 00 206 25 493 75 70 54
101 1420 3903 RefundslReimbursements 100 00 131 88 31 88 3188
1420 PLANNING ADMINISTRATION 100 00 131 88 31 88 3188
101 1520 3903 RefundslReimbursements 5 000 00 205 00 4 795 00 95 90
1520 PARK ADMINISTRATION 5 000 00 205 00 4 795 00 95 90
101 1530 3903 RefundslReimbursements 0 00 8 00 8 00 0 00
1530 RECREATION CENTER 0 00 8 00 8 00 0 00
101 1534 3903 RefundslReimbursements 500 00 0 00 500 00 100 00
1534 DANCE 500 00 0 00 500 00 100 00
4
403
Account Number Description
2007
Budget
2007 2007 2007
End Bal Dollars Unpsent Unspent
101 1550 3903
1550
101 1560 3803
101 1560 3807
1560
101 1600 3807
101 1600 3903
1600
101 1617 3903
1617
101 1731 3903
1731
Grand Total
Grand Total
RefundslReimbursements
PARK MAINTENANCE
Building Rental
Donations
SENIOR CITIZENS CENTER
Donations
RefundslReimbursements
RECREATION PROGRAMS
RefundslReimbursements
ICE RINKS
RefundslReimbursements
YOUTH ACTIVITIES
MISC REVENUE
500 00 4 025 54
500 00 4 025 54
0 00 22 50
0 00 830 56
0 00 853 06
13 000 00 7 300 00
150 00 53 80
13 150 00 7 353 80
0 00 511 80
0 00 511 80
200 00 0 00
200 00 0 00
247 000 00 271 822 79
247 000 00 271 822 79
9 062400 00 5 340468 47
3 52554
3 52554
22 50
83056
853 06
5 700 00
96 20
5 796 20
511 80
511 80
200 00
200 00
24 822 79
24 822 79
3 721 93153
705 11
705 11
0 00
0 00
0 00
43 85
6413
44 08
0 00
0 00
100 00
100 00
10 05
1005
4107
5
404
General Ledger
Expense Budget vs Actual CITY OF
User danielle CHANHASSENPrinted100407143449
Period 01 09
Fiscal Year 2007 2007
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unspent Unspent
Expense
10 1 0000 4950 Transfers Out 0 00 273 720 00 273 720 00 0 00
0000 0 00 273 720 00 273 720 00 0 00
101 1110 4020 Temporary Seasonal Wages 31 600 00 21 150 00 10450 00 33 07
101 1110 4030 Retirement Contributions 2 500 00 1 51240 987 60 39 50
101 1110 4050 Workers Compensation 100 00 0 00 100 00 100 00
101 1110 4210 Books and Periodicals 200 00 0 00 200 00 100 00
101 1110 4300 Consulting 13 000 00 13 801 25 80125 616
101 11104330 Postage 6 000 00 4443 66 1 556 34 25 94
101 1110 4340 Printing and Publishing 37 000 00 31 697 15 5 302 85 1433
101 1110 4360 Subscriptions and Memberships 28 000 00 20 896 00 7 104 00 25 37
101 1110 4370 Travel and Training 3 000 00 2 53445 46555 15 52
101 1110 4375 Promotional Expenses 2 000 00 3 926 75 1 926 75 96 34
1110 CITY COUNCIL 123 400 00 99 961 66 23 438 34 18 99
10 1 1120 4010 Salaries and Wages 295 000 00 206 535 28 88464 72 29 99
10 1 1120 4020 Temporary Seasonal Wages 6 000 00 0 00 6 000 00 100 00
101 1120 4030 Retirement Contributions 41 100 00 28 130 09 12 969 91 3156
101 1120 4040 Insurance Contributions 42 300 00 27 926 97 14 373 03 33 98
10 1 1120 4041 Contr Fix 000 1 032 60 1 032 60 0 00
101 1120 4050 Workers Compensation 1 100 00 0 00 1 100 00 100 00
101 1120 4120 Equipment Supplies 200 00 48 86 15114 7557
101 1120 4130 Program Supplies 100 00 0 00 100 00 100 00
101 1120 4210 Books and Periodicals 200 00 13047 69 53 34 77
101 1120 4300 Consulting 2 000 00 8 660 80 6 660 80 333 04
101 1120 4310 Telephone and Communications 1 500 00 1 604 28 104 28 6 95
101 1120 4330 Postage 13 000 00 5 437 86 7 56214 5817
101 1120 4340 Printing and Publishing 1 500 00 22043 1 27957 85 30
101 1120 4360 Subscriptions and Memberships 2 500 00 3 74245 1 24245 49 70
101 1120 4370 Travel and Training 5 500 00 3 766 67 1 733 33 3152
101 1120 4380 Mileage 7 200 00 4 259 92 2 940 08 40 83
101 1120 4410 Equipment Rental 18 500 00 13491 44 5 008 56 27 07
101 1120 4530 Repair Maint Equipment 300 00 0 00 300 00 100 00
101 1120 4807 Property Tax Expense 0 00 20 00 20 00 0 00
1120 ADMINISTRATION 438 000 00 305 008 12 132 991 88 30 36
101 1130 4010 Salaries and Wages 177 900 00 126 598 25 51 301 75 28 84
10 1 1130 4011 Overtime 200 00 0 00 200 00 100 00
10 1 1130 4030 Retirement Contributions 24 700 00 17 071 23 7 628 77 30 89
101 1130 4040 Insurance Contributions 22 200 00 15 795 96 6 404 04 28 85
10 1 1130 4041 Contr Fix 0 00 635 20 635 20 0 00
101 1130 4050 Workers Compensation 1 000 00 0 00 1 000 00 100 00
101 1130 4120 Equipment Supplies 200 00 23 75 176 25 8813
101 1130 4210 Books and Periodicals 100 00 0 00 100 00 100 00
10 1 1130 4300 Consulting 42 000 00 11 889 05 30 110 95 7169
101 1130 4301 Auditing 38 000 00 43408 75 5408 75 14 23
101 1130 4310 Telephone and Communications 300 00 259 52 4048 1349
101 1130 4330 Postage 200 00 0 00 200 00 100 00
101 1130 4340 Printing and Publishing 1 500 00 30955 1 19045 7936
1
405
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unspent Unspent
101 1130 4360 Subscriptions and Memberships 400 00 160 00 240 00 60 00
101 1130 4370 Travel and Training 9 000 00 4496 43 4 50357 50 04
101 1130 4530 Repair Maint Equipment 100 00 0 00 100 00 100 00
101 1130 4703 Office Equipment 200 00 159 75 40 25 2013
101 1130 4901 RefundsReimbursements 0 00 0 00 0 00 0 00
1130 FINANCE 318 000 00 220 80744 97 19256 30 56
101 1140 4302 Legal Consulting 168 000 00 97406 86 70 59314 42 02
1140 LEGAL 168 000 00 97406 86 70 59314 42 02
101 1141 4302 Legal Consulting 0 00 2100 2100 0 00
1141 HALLA SIGN LITIGATION 0 00 2100 2100 0 00
101 1142 4302 Legal Consulting 0 00 3 119 59 3 11959 0 00
1142 ARILD ROSSAVIK LITIGATION 0 00 3 119 59 3 119 59 0 00
101 1150 4300 Consulting 100 000 00 10 1 38014 1 380 14 138
101 1150 4340 Printing and Publishing 100 00 0 00 100 00 100 00
1150 PROPERTY ASSESSMENT 100 100 00 101 380 14 1 280 14 128
101 1160 4010 Salaries and Wages 124 300 00 90 004 96 34 295 04 27 59
101 1160 4030 Retirement Contributions 17 300 00 12 595 59 4 70441 2719
10 1 1160 4040 Insurance Contributions 17 900 00 12 93243 4 96757 27 75
10 1 1160 4041 Contr Fix 0 00 454 00 454 00 0 00
101 1160 4050 Workers Compensation 500 00 0 00 500 00 100 00
101 1160 4150 Maintenance Materials 1 300 00 67848 62152 47 81
101 1160 4210 Books and Periodicals 600 00 352 86 247 14 4119
101 1160 4220 Software Licenses 0 00 73850 73850 0 00
101 1160 4260 Small Tools Equipment 500 00 0 00 500 00 100 00
101 1160 4300 Consulting 78100 00 29 068 21 49 031 79 62 78
101 1160 4310 Telephone and Communications 1400 00 570 53 82947 59 25
101 1160 4320 Utilities 12 600 00 8 649 65 3 950 35 3135
101 1160 4370 Travel and Training 21 700 00 5 861 22 15 838 78 7299
101 1160 4530 Repair Maint Equipment 5 000 00 1 572 91 3427 09 68 54
101 1160 4933 Sales Tax 0 00 978 26 978 26 0 00
1160 MANAGEMENT INFORMATION SYSTEMS 281 200 00 164457 60 116 74240 4152
101 1170 4010 Salaries and Wages 49 600 00 35 547 29 14 052 71 28 33
101 1170 4011 Overtime 2 000 00 2 174 93 174 93 8 75
101 1170 4030 Retirement Contributions 6 900 00 5 28539 1 614 61 2340
101 1170 4040 Insurance Contributions 6 600 00 4 878 53 1 721 47 26 08
101 1170 4041 Contr Fix 0 00 227 00 227 00 0 00
101 1170 4050 Workers Compensation 1 500 00 0 00 1 500 00 100 00
101 1170 4110 Office Supplies 37 000 00 27 552 53 9 44747 2553
101 1170 4120 Equipment Supplies 1 000 00 659 24 340 76 34 08
101 1170 4140 Vehicle Supplies 1 000 00 146 22 853 78 85 38
101 1170 4150 Maintenance Materials 3 000 00 2 663 30 336 70 1122
101 1170 4260 Small Tools Equipment 500 00 34 09 465 91 9318
101 1170 4300 Consulting 6 000 00 4 61115 1 388 85 2315
101 1170 4310 Telephone and Communications 16 000 00 9 65236 6 347 64 39 67
101 1170 4320 Utilities 52 000 00 38487 99 13 512 01 25 98
101 1170 4330 Postage 0 00 392 51 392 51 0 00
101 1170 4350 Cleaning and Waste Removal 33 000 00 24 637 05 8 362 95 25 34
101 1170 4440 Vehicle License Registration 100 00 0 00 100 00 100 00
10 1 1170 4483 General Liability Insurance 205 500 00 274 807 00 69 307 00 33 73
10 1 1170 4510 Repair Maint Buildings 5 000 00 5 624 24 624 24 1248
101 1170 4520 Repair Maint Vehicles 400 00 0 00 400 00 100 00
101 1170 4530 Repair Maint Equipment 1 500 00 2439 66 939 66 62 64
101 1170 4933 Sales Tax 0 00 38 00 38 00 0 00
1170 CITY HALL MAINTENANCE 428 600 00 439 85848 11 25848 2 63
10 1 1180 4020 Temporary Seasonal Wages 12 500 00 0 00 12 500 00 100 00
10 1 1180 4030 Retirement Contributions 1 000 00 0 00 1 000 00 100 00
2
406
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unspent Unspent
101 1180 4110 Office Supplies 200 00 0 00 200 00 100 00
101 1180 4300 Consulting 3 000 00 0 00 3 000 00 100 00
101 1180 4340 Printing and Publishing 2 000 00 0 00 2 000 00 100 00
101 1180 4370 Travel and Training 1 000 00 0 00 1 000 00 100 00
1180 ELECTIONS 19 700 00 0 00 19 700 00 100 00
101 1190 4150 Maintenance Materials 2 000 00 1 208 39 791 61 39 58
101 1190 4260 Small Tools Equipment 0 00 8 71 8 71 0 00
101 1190 4300 Consulting 1 000 00 7 189 69 6 189 69 618 97
101 1190 4310 Telephone and Communications 2 200 00 1 126 78 1 073 22 48 78
101 1190 4320 Utilities 63 000 00 48 523 96 14 476 04 22 98
101 1190 4350 Cleaning and Waste Removal 30 000 00 22 884 86 7 11514 23 72
101 1190 4510 Repair Maint Buildings 2 000 00 6 33544 4 335 44 216 77
101 1190 4530 Repair Maint Equipment 2 000 00 5 128 84 3 128 84 15644
1190 LIBRARY BUILDING 102 200 00 92 406 67 9 79333 9 58
101 1210 4010 Salaries and Wages 58 800 00 42 547 08 16 252 92 27 64
10 1 1210 4030 Retirement Contributions 8 200 00 5 87818 2 32182 28 31
101 1210 4040 Insurance Contributions 6 700 00 4 70545 1 994 55 29 77
101 1210 4041 Contr Fix 0 00 227 00 227 00 0 00
10 1 1210 4050 Workers Compensation 500 00 0 00 500 00 100 00
101 1210 4130 Program Supplies 5 000 00 7415 4 925 85 98 52
101 1210 4300 Consulting 1 250 000 00 634 772 32 615 227 68 49 22
101 1210 4375 Promotional Expenses 4 500 00 50 00 4450 00 98 89
1210 POLICE CARVER CO CONTRACT 1 333 700 00 688 2541 8 645 445 82 4840
101 1220 4010 Salaries and Wages 133 500 00 97 02813 36471 87 27 32
10 1 1220 40 11 Overtime 1 000 00 27744 722 56 7226
10 1 I220 4020 Temporary Seasonal Wages 160 000 00 72 523 67 87 476 33 54 67
101 1220 4030 Retirement Contributions 187 000 00 29 293 85 157 70615 8433
10 1 1220 4040 Insurance Contributions 19 600 00 14 113 72 5486 28 27 99
10 I 1220 4041 Contr Fix 0 00 510 80 510 80 0 00
101 1220 4050 Workers Compensation 14 500 00 0 00 14 500 00 100 00
101 1220 4060 Unemployment 0 00 22 00 22 00 0 00
101 1220 4120 Equipment Supplies 11 000 00 8 910 79 2 089 21 18 99
101 1220 4130 Program Supplies 5 000 00 1 207 25 3 792 75 75 86
101 1220 4140 Vehicle Supplies 7 000 00 10 611 91 3 61191 5160
101 1220 4150 Maintenance Materials 1 000 00 496 38 503 62 50 36
101 1220 4170 Motor Fuels and Lubricants 0 00 109 26 109 26 0 00
101 1220 4210 Books and Periodicals 1 000 00 438 90 56110 56 1 I
101 1220 4240 Uniforms Clothing 13 500 00 7 101 84 6 3981 6 47 39
101 1220 4260 Small Tools Equip ent 5 000 00 4 103 92 896 08 17 92
101 1220 4290 Mise Materials Supplies 3 500 00 2 951 82 5481 8 15 66
101 1220 4300 Consulting 16 500 00 7 639 89 8 860 11 53 70
101 1220 4310 Telephone and Communications 6 000 00 3 788 23 2 211 77 36 86
101 1220 4320 Utilities 23 000 00 21 903 04 1 096 96 4 77
101 1220 4350 Cleaning and Waste Removal 7 000 00 3 652 69 3 347 31 47 82
101 1220 4360 Subscriptions and Memberships 3 000 00 1 54455 1455 45 4852
101 1220 4370 Travel and Training 10 000 00 17 39343 7 39343 73 93
101 1220 4375 Promotional Expenses 9 000 00 5 40215 3 597 85 39 98
101 1220 4483 General Liability Insurance 1 000 00 0 00 1 000 00 100 00
10 1 1220 4510 Repair Maint Buildings 7 000 00 5464 37 1 535 63 2194
101 1220 4520 Repair Maint Vehicles 7 000 00 5477 49 1 522 51 2175
101 1220 4530 Repair Maint Equipment 5 000 00 8 362 70 3 362 70 67 25
101 1220 4531 Repair Maint Radios 9 000 00 3 770 85 5 22915 5810
10 1 1220 4901 RefundsReimbursements 12 500 00 401 25 12 098 75 96 79
101 1220 4933 Sales Tax 0 00 23949 23949 0 00
1220 FIRE PREVENTION ADMIN 678 600 00 334 741 81 343 8581 9 50 67
10 1 1250 40 10 Salaries and Wages 524 000 00 342 749 97 181 250 03 34 59
3
407
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unspent Unspent
10 1 1250 4011 Overtime 2 000 00 8 112 03 6 112 03 305 60
101 1250 4020 Temporary Seasonal Wages 30 000 00 0 00 30 000 00 100 00
10 1 1250 4030 Retirement Contributions 72 900 00 47 783 84 25 11616 3445
101 1250 4040 Insurance Contributions 91 700 00 54 279 27 37420 73 40 81
10 1 1250 4041 Contr Fix 0 00 1 816 00 1 816 00 0 00
101 1250 4050 Workers Compensation 3 400 00 0 00 3400 00 100 00
101 1250 4120 Equipment Supplies 1 000 00 178 Q1 821 99 82 20
101 1250 4130 Program Supplies 800 00 90 32 709 68 88 71
101 1250 4140 Vehicle Supplies 1 500 00 813 58 68642 45 76
101 1250 4210 Books and Periodicals 3 500 00 734 70 2 76530 79 01
101 1250 4240 Uniforms Clothing 1 500 00 182 00 1 318 00 87 87
101 1250 4260 Small Tools Equipment 400 00 7104 328 96 82 24
101 1250 4300 Consulting 1 000 00 0 00 1 000 00 100 00
101 1250 4310 Telephone and Communications 4 000 00 1 964 64 2 03536 50 88
101 1250 4340 Printing and Publishing 2 000 00 1 643 22 356 78 17 84
101 1250 4360 Subscriptions and Memberships 1 000 00 342 00 658 00 65 80
101 1250 4370 Travel and Training 11 000 00 1 946 03 9 053 97 82 31
101 1250 4375 Promotional Expenses 200 00 0 00 200 00 100 00
101 1250 4440 Vehicle License Registration 200 00 0 00 200 00 100 00
101 1250 4520 Repair Maint Vehicles 1 500 00 403 32 1 096 68 7311
101 1250 4530 Repair Maint Equipment 2 500 00 1463 13 1 036 87 4147
101 1250 4901 Refu ndsIReimbursemen ts 0 00 79171 791 71 0 00
101 1250 4933 Sales Tax 0 00 10 08 10 08 0 00
1250 CODE ENFORCEMENT 756 100 00 465 374 89 290 72511 3845
101 1260 4020 Temporary Seasonal Wages 47 000 00 31 377 50 15 622 50 33 24
101 1260 4021 Temp Seasonal Overtime 1 000 00 1 051 50 5150 5 15
101 1260 4030 Retirement Contributions 4 900 00 4 562 90 337 10 6 88
101 1260 4040 Insurance Contributions 600 00 0 00 600 00 100 00
101 1260 4041 Contr Fix 0 00 454 00 454 00 0 00
10 1 1260 4050 Workers Compensation 700 00 0 00 700 00 100 00
101 1260 4120 Equipment Supplies 500 00 2 019 06 1 519 06 303 81
101 1260 4130 Program Supplies 700 00 442 62 257 38 36 77
101 1260 4140 Vehicle Supplies 700 00 671 63 2837 4 05
101 1260 4210 Books and Periodicals 200 00 3245 167 55 83 78
101 1260 4240 Uniforms Clothing 1 800 00 568 57 1 23143 6841
101 1260 4300 Consulting 7 000 00 10 016 08 3 016 08 43 09
101 1260 4310 Telephone and Communications 1 000 00 405 35 594 65 5947
101 1260 4340 Printing and Publishing 500 00 1 375 90 875 90 175 18
101 1260 4360 Subscriptions and Memberships 300 00 84 00 216 00 7200
101 1260 4370 Travel and Training 700 00 89 24 610 76 87 25
101 1260 4520 Repair Maint Vehicles 1 000 00 338 78 66122 6612
101 1260 4530 Repair Maint Equipment 300 00 0 00 300 00 100 00
101 1260 4531 Repair Maint Radios 300 00 377 26 7726 25 75
101 1260 4901 Refu ndsIRei mbursemen ts 0 00 50 00 50 00 0 00
101 1260 4933 Sales Tax 0 00 25 68 25 68 0 00
1260 AMINAL CONTROL 69 200 00 53 94252 15 25748 22 05
101 13 10 4010 Salaries and Wages 383 900 00 284 316 64 99 583 36 25 94
101 1310 4011 Overtime 1 000 00 316 66 683 34 68 33
101 1310 4020 Temporary Seasonal Wages 10 000 00 11 540 63 1 540 63 1541
101 1310 4030 Retirement Contributions 53 400 00 40 570 91 12 829 09 24 02
101 1310 4040 Insurance Contributions 46 300 00 30 530 39 15 769 61 34 06
101 1310 4041 Contr Fix 0 00 1 532 20 1 532 20 0 00
101 1310 4050 Workers Compensation 2 800 00 0 00 2 800 00 100 00
101 1310 4060 Unemployment 0 00 3409 69 3409 69 0 00
101 1310 4120 Equipment Supplies 200 00 0 00 200 00 100 00
101 1310 4140 Vehicle Supplies 300 00 538 89 238 89 79 63
4
408
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unspent Unspent
101 1310 4210 Books and Periodicals 400 00 7190 3281 0 82 03
101 1310 4300 Consulting 18 000 00 770 60 18 770 60 104 28
101 1310 4303 Engineering Consulting 0 00 2 808 00 2 808 00 0 00
101 1310 4310 Telephone and Communications 2 000 00 1 365 18 634 82 3174
101 1310 4330 Postage 400 00 0 00 400 00 100 00
101 1310 4340 Printing and Publishing 1 100 00 505 59 59441 54 04
101 1310 4360 Subscriptions and Memberships 1 200 00 835 00 365 00 3042
101 1310 4370 Travel and Training 3 000 00 2 528 68 47132 15 71
101 1310 4380 Mileage 200 00 1164 188 36 9418
10 1 1310 4440 Vehicle License Registration 300 00 0 00 300 00 100 00
101 1310 4520 Repair Maint Vehicles 500 00 0 00 500 00 100 00
101 1310 4530 Repair Maint Equipment 3 000 00 3 577 19 577 19 19 24
101 1310 4531 Repair Maint Radios 100 00 0 00 100 00 100 00
101 1310 4705 Other Equipment 300 00 0 00 300 00 100 00
10 1 1310 490 1 RefundslReimbursements 0 00 0 00 0 00 0 00
101 1310 4933 Sales Tax 0 00 108 94 108 94 0 00
1310 ENGINEERING 528400 00 383 79753 144 60247 27 37
101 1320 4010 Salaries and Wages 436400 00 315 212 82 121 18718 27 77
101 1320 4011 Overtime 10 000 00 6 552 33 3 447 67 3448
101 1320 4020 Temporary Seasonal Wages 17 800 00 7 894 50 9 90550 55 65
101 1320 4030 Retirement Contributions 60 700 00 45 196 59 15 50341 25 54
101 1320 4040 Insurance Contributions 72 900 00 46 735 93 26 164 07 35 89
101 1320 4041 Contr Fix 0 00 1 872 80 1 872 80 0 00
101 1320 4050 Workers Compensation 17 500 00 0 00 17 500 00 100 00
101 1320 4120 Equipment Supplies 47 000 00 27480 69 19 519 31 4153
101 1320 4140 Vehicle Supplies 28 000 00 10 569 03 17 430 97 62 25
101 1320 4150 Maintenance Materials 55 000 00 49 053 27 5 946 73 10 81
101 1320 4170 Motor Fuels and Lubricants 0 00 1 642 97 1 642 97 0 00
101 1320 4210 Books and Periodicals 100 00 0 00 100 00 100 00
101 1320 4240 Uniforms Clothing 3 700 00 2 649 06 1 050 94 2840
101 1320 4260 Small Tools Equipment 2 700 00 1 303 77 1 396 23 5171
101 1320 4300 Consulting 1 000 00 140 50 859 50 85 95
101 1320 4310 Telephone and Communications 3 500 00 2 324 99 1175 01 3357
101 1320 4340 Printing and Publishing 300 00 58 80 241 20 8040
101 1320 4350 Cleaning and Waste Removal 300 00 0 00 300 00 100 00
101 1320 4360 Subscriptions and Memberships 100 00 27 00 73 00 73 00
101 1320 4370 Travel and Training 1 500 00 742 65 757 35 5049
101 1320 4410 Equipment Rental 1 500 00 6 248 00 4 748 00 316 53
10 1 1320 4440 Vehicle License Registration 600 00 1000 590 00 98 33
101 1320 4510 Repair Maint Buildings 500 00 0 00 500 00 100 00
101 1320 4520 Repair Maint Vehicles 2400 00 1 78340 616 60 25 69
101 1320 4530 Repair Maint Equipment 5 500 00 540 25 4 959 75 9018
101 1320 4531 Repair Maint Radios 2 000 00 0 00 2 000 00 100 00
101 1320 4540 Repair Maint Streets 500 00 8 575 03 8 075 03 1 615 01
101 1320 4560 Repair Maint Signs 13 700 00 7 872 16 5 827 84 42 54
101 1320 4703 Office Equipment 300 00 0 00 300 00 100 00
101 1320 4705 Other Equipment 1 000 00 0 00 1 000 00 100 00
101 1320 4933 Sales Tax 0 00 1 038 63 1 038 63 0 00
1320 STREET MAINTENANCE 786 500 00 545 52517 240 974 83 30 64
101 1350 4120 Equipment Supplies 4 500 00 1 008 03 3491 97 7760
101 1350 4300 Consulting 300 00 0 00 300 00 100 00
101 1350 4310 Telephone and Communications 600 00 332 64 267 36 44 56
101 1350 4320 Utilities 290 000 00 201423 23 88 576 77 3054
101 1350 4530 Repair Maint Equipment 2 500 00 0 00 2 500 00 100 00
101 1350 4565 Repair Maint Lights 17 000 00 11 555 53 5 44447 32 03
1350 STREET LIGHTING SIGNALS 314 900 00 214 31943 100 580 57 3194
5
409
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unspent Unspent
101 1370 4010 Salaries and Wages 187400 00 124 841 88 62 55812 3338
101 1370 4011 Overtime 6 500 00 0 00 6 500 00 100 00
101 1370 4030 Retirement Contributions 26 100 00 16 610 91 9489 09 3636
101 1370 4040 Insurance Contributions 32 000 00 22 802 20 9 197 80 28 74
101 1370 4041 Contr Fix 0 00 66940 66940 0 00
101 1370 4050 Workers Compensation 6 000 00 0 00 6 000 00 100 00
101 1370 4120 Equipment Supplies 3 300 00 1 147 30 2 152 70 65 23
101 1370 4140 Vehicle Supplies 500 00 0 00 500 00 100 00
101 1370 4150 Maintenance Materials 1 000 00 2 269 09 1 269 09 126 91
101 1370 4170 Motor Fuels and Lubricants 140 000 00 115 351 61 24 648 39 17 61
101 1370 4240 Uniforms Clothing 1 200 00 521 84 678 16 56 51
101 1370 4260 Small Tools Equipment 4400 00 669 03 3 730 97 84 79
101 1370 4300 Consulting 1 300 00 46441 835 59 64 28
101 1370 4310 Telephone and Communications 3 800 00 1 845 93 1 954 07 5142
101 1370 4320 Utilities 23 000 00 14 952 75 8 047 25 34 99
10 1 1370 4340 Printing and Publishing 100 00 58 80 4120 41 20
101 1370 4350 Cleaning and Waste Removal 6 100 00 3405 22 2 694 78 4418
101 1370 4360 Subscriptions and Memberships 200 00 35 00 165 00 82 50
101 1370 4370 Travel and Training 1 500 00 401 06 1 098 94 73 26
101 1370 4410 Equipment Rental 500 00 0 00 500 00 100 00
101 1370 4440 Vehicle License Registration 500 00 1000 490 00 98 00
101 1370 4510 Repair Maint Buildings 4 000 00 2 296 93 1 703 07 42 58
101 1370 4520 Repair Maint Vehicles 300 00 0 00 300 00 100 00
101 1370 4530 Repair Maint Equipment 3 800 00 1 696 00 2 104 00 55 37
101 1370 4531 Repair Maint Radios 100 00 0 00 100 00 100 00
101 1370 4703 Office Equipment 500 00 9 76 490 24 98 05
101 1370 4705 Other Equipment 5 500 00 0 00 5 500 00 100 00
101 1370 4933 Sales Tax 0 00 5 66 5 66 0 00
1370 CITY GARAGE 459 600 00 310 064 78 149 535 22 3254
101 1410 4210 Books and Periodicals 200 00 0 00 200 00 100 00
101 1410 4340 Printing and Publishing 3 000 00 2 774 84 22516 7 51
101 1410 4360 Subscriptions and Memberships 200 00 120 00 80 00 40 00
101 1410 4370 Travel and Training 800 00 155 00 645 00 80 63
1410 PLANNING COMMISSION 4 200 00 3 049 84 1 15016 27 38
101 1420 4010 Salaries and Wages 283 200 00 200414 43 82 785 57 29 23
101 1420 4030 Retirement Contributions 39400 00 27 068 01 12 33199 3130
101 1420 4040 Insurance Contributions 39 200 00 30 68642 8 513 58 2172
101 1420 4041 Contr Fix 0 00 976 01 976 01 0 00
101 1420 4050 Workers Compensation 1 000 00 0 00 1 000 00 100 00
101 1420 4120 Equipment Supplies 300 00 19114 108 86 36 29
101 1420 4130 Program Supplies 100 00 0 00 100 00 100 00
101 1420 4140 Vehicle Supplies 100 00 32 70 67 30 67 30
101 1420 4210 Books and Periodicals 200 00 0 00 200 00 100 00
101 1420 4300 Consulting 5 000 00 225 27 4 774 73 9549
101 1420 4310 Telephone and Communications 200 00 55 05 144 95 7248
101 1420 4340 Printing and Publishing 200 00 0 00 200 00 100 00
101 1420 4360 Subscriptions and Memberships 1 500 00 0 00 1 500 00 100 00
101 1420 4370 Travel and Training 7 000 00 3 769 69 3 230 31 46 15
101 1420 4520 Repair Maint Vehicles 200 00 119 00 81 00 40 50
1420 PLANNING ADMINISTRATION 377 600 00 263 537 72 114 062 28 30 21
101 1421 4300 Consulting 0 00 35 969 51 35 969 51 0 00
1421 COMP PLAN UPDATE 0 00 35 969 51 35 96951 0 00
101 1430 4010 Salaries and Wages 15 900 00 11455 09 4 444 91 27 96
101 1430 4030 Retirement Contributions 2 200 00 1 59046 609 54 27 71
101 1430 4040 Insurance Contributions 1 700 00 1 238 10 461 90 2717
101 1430 4041 Contr Fix 0 00 56 80 56 80 0 00
6
410
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unspent Unspent
101 1430 4050 Workers Compensation 100 00 0 00 100 00 100 00
101 1430 4300 Consulting 9 500 00 4 200 00 5 300 00 55 79
101 1430 4370 Travel and Training 200 00 0 00 200 00 100 00
101 1430 4375 Promotional Expenses 500 00 0 00 500 00 100 00
1430 SENIOR FACILITY COMMISSION 30 100 00 18 54045 11 55955 3840
101 1510 4130 Program Supplies 100 00 0 00 100 00 100 00
101 1510 4210 Books and Periodicals 100 00 0 00 100 00 100 00
101 1510 4340 Printing and Publishing 900 00 953 20 53 20 5 91
101 1510 4360 Subscriptions and Memberships 700 00 0 00 700 00 100 00
101 1510 4370 Travel and Training 400 00 138 16 261 84 6546
1510 PARK COMMISSION 2 200 00 1 091 36 1 108 64 5039
101 1520 4010 Salaries and Wages 89 200 00 66 675 30 22 524 70 25 25
101 1520 4030 Retirement Contributions 12400 00 9 011 49 3 38851 27 33
101 1520 4040 Insurance Contributions 11400 00 8 121 54 3 27846 28 76
101 1520 4041 Contr Fix 000 227 00 227 00 0 00
101 1520 4050 Workers Compensation 400 00 0 00 400 00 100 00
101 1520 4120 Equipment Supplies 500 00 9048 409 52 81 90
101 1520 4130 Program Supplies 200 00 12 76 187 24 93 62
101 1520 4140 Vehicle Supplies 0 00 318 84 318 84 0 00
101 1520 4210 Books and Periodicals 100 00 0 00 100 00 100 00
101 1520 4240 Uniforms Clothing 200 00 0 00 200 00 100 00
101 1520 4300 Consulting 1 100 00 0 00 1 100 00 100 00
101 1520 4310 Telephone and Communications 900 00 626 77 273 23 30 36
101 1520 4330 Postage 400 00 0 00 400 00 100 00
101 1520 4340 Printing and Publishing 1 500 00 423 90 1 076 10 7174
101 1520 4360 Subscriptions and Memberships 1 200 00 1 055 00 145 00 12 08
101 1520 4370 Travel and Training 3 800 00 1478 24 2 321 76 6110
101 1520 4380 Mileage 200 00 147 92 52 08 26 04
1520 PARK ADMINISTRATION 123 500 00 88 189 24 35 310 76 2859
101 1530 4010 Salaries and Wages 43 300 00 30 86058 12439 42 28 73
101 1530 4020 Temporary Seasonal Wages 132 000 00 49 642 84 82 357 16 6239
101 1530 4030 Retirement Contributions 28 000 00 11 025 16 16 974 84 60 62
101 1530 4040 Insurance Contributions 6 600 00 4 621 06 1 978 94 29 98
101 1530 4041 Contr Fix 0 00 227 00 227 00 0 00
101 1530 4050 Workers Compensation 4 200 00 0 00 4 200 00 100 00
101 1530 4060 Unemployment 0 00 907 97 907 97 0 00
101 1530 4120 Equipment Supplies 8 000 00 1 180 07 6 819 93 85 25
101 1530 4130 Program Supplies 3 000 00 1 268 78 1 731 22 57 71
101 1530 4150 Maintenance Materials 500 00 0 00 500 00 100 00
101 1530 4300 Consulting 500 00 7546 424 54 84 91
101 1530 4310 Telephone and Communications 1 500 00 1 439 74 60 26 4 02
101 1530 4320 Utilities 36 500 00 16 250 77 20 249 23 5548
101 1530 4360 Subscriptions and Memberships 300 00 32 50 267 50 8917
101 1530 4370 Travel and Training 400 00 0 00 400 00 100 00
101 1530 4375 Promotional Expenses 300 00 306 00 6 00 2 00
101 1530 4510 Repair Maint Buildings 2 500 00 0 00 2 500 00 100 00
101 1530 4530 Repair Maint Equipment 1 000 00 635 85 364 15 3642
101 1530 4590 Miscellanous Contract Services 500 00 0 00 500 00 100 00
1530 RECREATION CENTER 269 100 00 118 473 78 150 626 22 55 97
101 1531 4020 Temporary Seasonal Wages 0 00 528 64 528 64 0 00
101 1531 4030 Retirement Contributions 0 00 73 26 73 26 0 00
1531 ROOM RENTAL 0 00 601 90 601 90 0 00
101 1532 4020 Temporary Seasonal Wages 0 00 5 775 29 5 775 29 0 00
101 1532 4030 Retirement Contributions 0 00 562 70 562 70 0 00
101 1532 4130 Program Supplies 0 00 29040 29040 0 00
1532 FITNESS 0 00 6 628 39 6 628 39 0 00
7
411
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unspent Unspent
101 1533 4300 Consulting 0 00 90 00 90 00 0 00
1533 PERSONAL TRAINING 0 00 90 00 90 00 0 00
101 1534 4020 Temporary Seasonal Wages 0 00 35 790 22 35 790 22 0 00
101 1534 4030 Retirement Contributions 0 00 4 94846 4 94846 0 00
101 1534 4130 Program Supplies 0 00 4494 09 4494 09 0 00
101 1534 4300 Consulting 0 00 2 030 99 2 030 99 0 00
101 1534 4590 MisceIlanous Contract Services 0 00 500 00 500 00 0 00
1534 DANCE 0 00 47 763 76 47 763 76 0 00
101 1535 4130 Dance Costumes 0 00 3 13853 3 13853 0 00
1535 DANCE COSTUMES 0 00 3 138 53 3 13853 0 00
101 1540 4020 Temporary Seasonal Wages 12 800 00 7 029 27 5 770 73 45 08
101 1540 4021 Temp Seasonal Overtime 500 00 6 00 494 00 98 80
101 1540 4030 Retirement Contributions 800 00 538 20 261 80 32 73
101 1540 4050 Workers Compensation 300 00 0 00 300 00 100 00
101 1540 4120 Equipment Supplies 3 800 00 3 36419 435 81 1147
101 1540 4130 Program Supplies 9 100 00 5 835 27 3 264 73 35 88
101 1540 4240 Uniforms Clothing 500 00 500 00 0 00 0 00
101 1540 4300 Consulting 31 800 00 28 924 98 2 875 02 9 04
101 1540 4310 Telephone and Communications 3 600 00 2 206 04 1 393 96 38 72
101 1540 4320 Utilities 8 300 00 8 857 09 557 09 6 71
101 1540 4340 Printing and Publishing 300 00 0 00 300 00 100 00
1540 LAKE ANN PARK 71 800 00 57 261 04 14 538 96 20 25
101 1550 4010 Salaries and Wages 422 800 00 309 256 86 113 543 14 26 86
101 1550 4011 Overtime 8 000 00 9 314 88 1 314 88 1644
101 1550 4020 Temporary Seasonal Wages 79 000 00 74 592 51 4407 49 5 58
10 1 1550 4021 Temp Seasonal Overtime 3 000 00 2416 34 583 66 1946
101 1550 4030 Retirement Contributions 58 800 00 48 967 72 9 832 28 16 72
101 1550 4040 Insurance Contributions 71 000 00 50 944 79 20 055 21 28 25
101 1550 4041 Contr Fix 0 00 1 645 80 1 645 80 0 00
101 1550 4050 Workers Compensation 9 500 00 0 00 9 500 00 100 00
101 1550 4120 Equipment Supplies 32 000 00 28 924 17 3 075 83 9 61
10 1 1550 4140 Vehicle Supplies 8 000 00 2 190 19 5 809 81 7262
101 1550 4150 Maintenance Materials 33 000 00 18 273 31 14 726 69 44 63
101 1550 4151 Irrigation Materials 3 000 00 2 042 85 957 15 3191
101 1550 4240 Uniforms Clothing 2 800 00 637 95 2 162 05 7722
101 1550 4260 Small Tools Equipment 2 500 00 1 11216 1 387 84 55 51
101 1550 4300 Consulting 18 000 00 22 37345 4 37345 24 30
101 1550 4310 Telephone and Communications 3 700 00 2 850 09 849 91 22 97
101 1550 4320 Utilities 6 000 00 5 18342 816 58 13 61
101 1550 4340 Printing and Publishing 400 00 58 80 341 20 85 30
101 1550 4350 Cleaning and Waste Removal 9 000 00 5 505 75 3494 25 38 83
101 1550 4360 Subscriptions and Memberships 400 00 105 00 295 00 73 75
101 1550 4370 Travel and Training 2 000 00 367 05 1 632 95 8165
101 1550 4400 Rental Land and Buildings 23 500 00 19477 56 4 02244 1712
101 1550 4410 Equipment Rental 2 000 00 114 23 1 885 77 94 29
101 1550 4440 Vehicle License Registration 700 00 1000 690 00 98 57
101 1550 4510 Repair Maint Buildings 3 000 00 297 29 2 702 71 90 09
101 1550 4520 Repair Maint Vehicles 2 500 00 0 00 2 500 00 100 00
101 1550 4530 Repair Maint Equipment 6 500 00 5 548 64 95136 14 64
101 1550 4531 Repair Maint Radios 500 00 0 00 500 00 100 00
101 1550 4541 Repair Maint Trails 0 00 8108 8108 0 00
101 1550 4560 Repair Maint Signs 4 000 00 2432 1 6 1 567 84 39 20
101 1550 4705 Other Equipment 4 000 00 4 93841 93841 2346
101 1550 4933 Sales Tax 0 00 138 81 138 81 0 00
1550 PARK MAINTENANCE 819 600 00 619 801 27 199 798 73 24 38
101 1551 4150 Maintenance Materials 0 00 289 87 289 87 0 00
8
412
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unspent Unspent
10 1 1551 4260 Small Tools Equipment 0 00 13307 133 07 0 00
101 1551 4320 Utilities 0 00 958 53 958 53 0 00
101 1551 4510 Repair Maint Buildings 0 00 5 550 00 5 550 00 0 00
1551 DOWNTOWN MAINTENANCE 0 00 6 931 47 6 93147 0 00
101 1560 4010 Salaries and Wages 26 900 00 20 28149 6 61851 24 60
101 1560 4030 Retirement Contributions 3 700 00 2 817 83 882 17 23 84
10 1 15 60 4040 Insurance Contributions 300 00 0 00 300 00 100 00
101 1560 4050 Workers Compensation 200 00 0 00 200 00 100 00
101 1560 4120 Equipment Supplies 300 00 41045 11045 36 82
101 1560 4130 Program Supplies 3 500 00 3479 53 2047 0 58
101 1560 4300 Consulting 16 500 00 11 086 96 5413 04 32 81
101 1560 4340 Printing and Publishing 100 00 0 00 100 00 100 00
101 1560 4350 Cleaning and Waste Removal 200 00 0 00 200 00 100 00
101 1560 4360 Subscriptions and Memberships 100 00 7700 23 00 23 00
101 1560 4370 Travel and Training 300 00 110 00 190 00 63 33
101 1560 4375 Promotional Expenses 200 00 229 72 29 72 14 86
101 1560 4380 Mileage 100 00 0 00 100 00 100 00
1560 SENIOR CITIZENS CENTER 52400 00 38492 98 13 907 02 2654
101 1600 4010 Salaries and Wages 84 600 00 57 756 22 26 843 78 3173
10 1 1600 4020 Temporary Seasonal Wages 64 300 00 10 041 00 54 259 00 84 38
10 1 1600 4021 Temp Seasonal Overtime 200 00 633 00 433 00 216 50
101 1600 4030 Retirement Contributions 14 900 00 8 860 30 6 039 70 40 53
101 1600 4040 Insurance Contributions 10 600 00 7 295 38 3 304 62 3118
101 1600 4041 Contr Fix 0 00 340 50 340 50 0 00
101 1600 4050 Workers Compensation 1 000 00 0 00 1 000 00 100 00
101 1600 4120 Equipment Supplies 2 000 00 0 00 2 000 00 100 00
101 1600 4130 Program Supplies 13 100 00 2 96047 10 139 53 7740
101 1600 4240 Uniforms Clothing 1 500 00 708 00 792 00 52 80
101 1600 4300 Consulting 47 400 00 9477 13 37 922 87 80 01
101 1600 4310 Telephone and Communications 3 300 00 712 30 2 587 70 7842
101 1600 4320 Utilities 2 500 00 1 78640 713 60 2854
101 1600 4330 Postage 200 00 0 00 200 00 100 00
101 1600 4340 Printing and Publishing 4400 00 0 00 4400 00 100 00
101 1600 4370 Travel and Training 500 00 0 00 500 00 100 00
101 1600 4380 Mileage 500 00 0 00 500 00 100 00
101 1600 4400 Rental Land and Buildings 5 500 00 0 00 5 500 00 100 00
101 1600 4410 Equipment Rental 17 700 00 0 00 17 700 00 100 00
101 1600 4530 Repair Maint Equipment 0 00 110 70 110 70 0 00
1600 RECREATION PROGRAMS 274 200 00 100 681 40 173 518 60 63 28
101 1611 4130 Program Supplies 0 00 1 307 75 1 307 75 0 00
101 1611 4340 Printing and Publishing 0 00 1 715 20 1 715 20 0 00
101 1611 4400 Rental Land and Buildings 0 00 440 98 440 98 0 00
101 1611 4410 Equipment Rental 0 00 816 86 816 86 0 00
1611 FEBRUARY FESTIVAL 0 00 4 280 79 4 280 79 0 00
10 1 1612 4130 Program Supplies 0 00 1 676 89 1 676 89 0 00
101 1612 4300 Consulting 0 00 490 60 490 60 0 00
1612 EASTER EGG CANDY HUNT 0 00 2 16749 2 16749 0 00
101 1613 4130 Program Supplies 0 00 3 058 51 3 05851 0 00
101 1613 4300 Consulting 0 00 36 047 93 36 047 93 0 00
101 1613 4340 Printing and Publishing 0 00 2412 41 2412 41 0 00
101 1613 4400 Rental Land and Buildings 0 00 5 73716 5 73716 0 00
101 1613 4410 Equipment Rental 0 00 15402 54 15402 54 0 00
101 1613 4933 Sales Tax 0 00 74 32 7432 0 00
1613 FOURTH OF JULY 0 00 62 732 87 62 732 87 0 00
101 1614 4300 Consulting 0 00 262 50 262 50 0 00
1614 HALLOWEEN PARTY 0 00 262 50 262 50 0 00
9
413
2007 2007 2007 2007
Account Number Description Budget End Bal Dollars Unspent Unspent
101 1616 4020 Temporary Seasonal Wages 0 00 30435 58 30435 58 0 00
101 1616 4021 Temp Seasonal Overtime 0 00 469 33 46933 0 00
101 1616 4030 Retirement Contributions 0 00 2 364 22 2 364 22 0 00
10 1 1616 4130 Program Supplies 0 00 1 057 68 1 057 68 0 00
101 1616 4300 Consulting 0 00 320 00 320 00 0 00
101 1616 4370 Travel and Training 0 00 2 78 2 78 0 00
1616 SUMMER PLAYGROUND 0 00 34 649 59 34 64959 0 00
101 1617 4020 Temporary Seasonal Wages 0 00 6 325 34 6 325 34 0 00
101 1617 4030 Retirement Contributions 0 00 483 90 483 90 0 00
101 1617 4410 Equipment Rental 0 00 2 974 84 2 974 84 0 00
1617 ICE RINKS 0 00 9 784 08 9 784 08 0 00
101 1700 4010 Salaries and Wages 21 200 00 14 43913 6 760 87 3189
101 1700 4020 Temporary Seasonal Wages 13 600 00 0 00 13 600 00 100 00
101 1700 4030 Retirement Contributions 3 300 00 2 010 86 1 28914 39 06
10 1 1700 4040 Insurance Contributions 2 600 00 1 823 80 776 20 29 85
101 1700 4041 Contr Fix 0 00 8513 8513 0 00
101 1700 4050 Workers Compensation 100 00 0 00 100 00 100 00
101 1700 4120 Equipment Supplies 600 00 188 72 411 28 68 55
101 1700 4130 Program Supplies 8 000 00 370 79 7 629 21 95 37
101 1700 4300 Consulting 82 100 00 175 00 81 925 00 99 79
1700 SELF SUPPORTING PROGRAMS 131 500 00 19 09343 112406 57 8548
101 1710 4300 Consulting 0 00 14 075 00 14 075 00 0 00
1710 PRESCHOOL SPORTS 0 00 14 075 00 14 075 00 0 00
101 1711 4130 Program Supplies 0 00 225 00 225 00 0 00
101 1711 4300 Consulting 0 00 590 00 590 00 0 00
1711 PRESCHOOL ACTIVITIES 0 00 815 00 815 00 0 00
101 1730 4300 Consulting 0 00 6470 00 6470 00 0 00
1730 YOUTH SPORTS 0 00 6470 00 6 470 00 0 00
101 1731 4130 Program Supplies 0 00 820 08 820 08 0 00
101 1731 4300 Consulting 0 00 13 316 27 13 316 27 0 00
1731 YOUTH ACTIVITIES 0 00 14 136 35 14 136 35 0 00
101 1760 4020 Temporary Seasonal Wages 0 00 88943 88943 0 00
101 1760 4030 Retirement Contributions 0 00 123 51 123 51 0 00
1760 ADULT SPORTS 0 00 1 012 94 1 012 94 0 00
101 1761 4300 Consulting 0 00 6 390 90 6 390 90 0 00
1761 ADULT ACTIVITIES 0 00 6 390 90 6 390 90 0 00
101 1763 4130 Program Supplies 0 00 4158 415 8 0 00
1763 SPRING 3 0N 3 BASKETBALL 0 00 4158 4158 0 00
101 1764 4130 Program Supplies 0 00 288 68 288 68 0 00
1764 WINTER 3 0N 3 BASKETBALL 0 00 288 68 288 68 0 00
101 17 66 4020 Temporary Seasonal Wages 0 00 2 500 00 2 500 00 0 00
101 1766 4030 Retirement Contributions 0 00 191 24 191 24 0 00
101 1766 4130 Program Supplies 0 00 3 841 41 3 84141 0 00
101 1766 4300 Consulting 0 00 7 311 00 7 31100 0 00
1766 SUMMER SOFTBALL 0 00 13 843 65 13 843 65 0 00
101 1767 4300 Consulting 0 00 902 00 902 00 0 00
1767 FALL SOFTBALL 0 00 902 00 902 00 0 00
Grand Total 9 062400 006 395 357 36 2 667 042 64 2943
Grand Total 9 062400 006 395 357 36 2 667 042 64 2943
10
414
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952 227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952227 1404
Planning
Natural Resources
Phone 952227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952 227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
MEMORANDUM
TO Mayor
City Council
Greg Sticha Finance Director f1FROM
DATE September 28 2007 IIyfOZReviewofClaimsPaidSUBJECT
The following claims are submitted for review on October 8 2007
Check Numbers Amounts
134259 134384 1 194 448 89
SeptemberVisa charges 13 977 93
Total All Claims 1 208426 82
Attachments Check Summary
Check Detail Report
Visa Listing
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A great place to live work and play415
CITY OF CHANHASSEN Accounts Payable Printed 09 28 2007 11 41
User danielle Checks by Date Summary by Check Number Summary
Check Number Vendor No Vendor Name Check Date Void Amount Check Amount
134259 10000 10 000 Lakes Chapter 09 202007 0 00 700 00
134260 3dspe 3D SPECIALTIES 09 20 2007 0 00 40354
134261 a1ele A I ELECTRIC SERVICE 09 20 2007 0 00 3 793 86
134262 alltim ALL TIME FAVORITES 09 202007 0 00 275 00
134263 amesol AMERICAN SOLUTIONS 09 202007 0 00 769 22
134264 anctec ANCOM TECHNICAL CENTER 09 20 2007 0 00 32 75
134265 apagro APACHE GROUP 09 202007 0 00 638 80
134266 appeco Applied Ecological Services In 09 20 2007 0 00 600 00
134267 autunI AUTOMOTIVE UNLIMITED 09 202007 0 00 89 65
134268 banfor BANN FORMS TECHNOLOGY 09 20 2007 0 00 754 03
134269 bergjoe JOE BERG 09 20 2007 0 00 155 00
134270 beutjohn John Jennifer Beutz 09 20 2007 0 00 500 00
134271 borsta BORDER STATES ELECTRIC SUPPLY 09 20 2007 0 00 366 06
134272 BROMUS BROADCAST MUSIC INC 09 20 2007 0 00 29040
134273 calico CALICO 09 20 2007 0 00 129 50
134274 carred CARVER COUNTY RED CROSS 09 20 2007 0 00 389 50
134275 cenene CENTERPOINT ENERGY MINNEGASCO 09 20 2007 0 00 164 12
134276 corexp CORPORATE EXPRESS 09 20 2007 0 00 22 30
134277 cubfoo CUB FOODS 09 20 2007 0 00 2174
134278 delden Delta Dental 09 20 2007 0 00 1 159 20
134279 dyname DYNAMEX DELIVERS NOW 09 20 2007 0 00 94 50
134280 earand EARL F ANDERSEN INC 09 20 2007 0 00 47 38
134281 EDEPRA EDEN PRAIRIE SCHOOL DIST 272 09 20 2007 0 00 2 978 65
134282 ehlers EHLERS ASSOCIATES INC 09 20 2007 0 00 405 00
134283 Elecin Electronic Installations Inc 09 20 2007 0 00 5 76
134284 ernst Ernst Associates 09 20 2007 0 00 1 717 60
134285 FerrHoll Holly Ferraro 09 20 2007 0 00 65 00
134286 grnhasp GMH ASPHALT CORP 09 20 2007 0 00 37 23 1 24
134287 gopsig GOPHER SIGN COMPANY 09 20 2007 0 00 389 97
134288 GOPSTA GOPHER STATE ONE CALL INC 09 20 2007 0 00 913 65
134289 hantho HANSEN THORP PELLINEN OLSON 09 20 2007 0 00 14 590 17
134290 hawche HAWKINS CHEMICAL 09 20 2007 0 00 60 00
134291 hidfen HIDDEN FENCE OF MINNESOTA 09 20 2007 0 00 108 00
134292 hoikoe HOISINGTON KOEGLER GROUP 09 20 2007 0 00 7 810 00
134293 imppor IMPERIAL PORTA PALACE 09 20 2007 0 00 3 75542
134294 indian INDOOR LANDSCAPES INC 09 20 2007 0 00 199 16
134295 kimhor KIM LEY HORN AND ASSOCIATES INC 09 20 2007 0 00 24 14043
134296 margie Mark Giesen Enterprises 09 20 2007 0 00 1 786 00
134297 rnxlog MX Logic 09 20 2007 0 00 97 00
134298 NorPum North Star Pump Service 09 20 2007 0 00 3 123 50
134299 parsup PARTEK SUPPLY INC 09 20 2007 0 00 548 74
134300 prares PRAIRIE RESTORATIONS INC 09 20 2007 0 00 13349
134301 qwest QWEST 09 20 2007 0 00 6842
134302 robbteri Teri Robb 09 20 2007 0 00 95 00
134303 salgui Sales Guides 09 20 2007 0 00 367 60
134304 seh SEH 09 20 2007 0 00 9 35643
134305 sensys SENTRY SYSTEMS INC 09 20 2007 0 00 302 65
134306 shewil SHERWIN WILLIAMS 09 20 2007 0 00 43 35
134307 soumet TRAINING FACILITY SOUTH METRO PUBLIC SAUJ 20 2007 0 00 510 00
134308 statri STAR TRIBUNE 09 20 2007 0 00 32 50
134309 terrnin TERMINIX 09 20 2007 0 00 47 93
134310 taigas TOLL GAS WELDING SUPPLY 09 20 2007 0 00 9 87
134311 topnot TOP NOTCH TREE CARE 09 20 2007 0 00 99045
134312 twisee TWIN CITY SEED CO 09 20 2007 0 00 372 75
134313 verizo VERIZON WIRELESS 09 20 2007 0 00 27 95
134314 wenck WENCK ASSOCIATES INC 09 20 2007 0 00 2 020 88
134315 wsb WSB ASSOCIATES INC 09 20 2007 0 00 18 155 17
134316 xcel XCEL ENERGY INC 09 20 2007 0 00 2 259 98
134317 altreb ALTERNATOR REBUILD CO 09 27 2007 0 00 18344
134318 anctec ANCOM TECHNICAL CENTER 09 27 2007 0 00 2 355 28
134319 atou A TOUCH OF MAGIC 09 27 2007 0 00 262 50
134320 benpro BENIEK PROPERTY SERVICES INC 09 27 2007 0 00 106 50
Page I
416
CITY OF CHANHASSEN Accounts Payable Printed 09 28 2007 11 41
User danielle Checks by Date Summary by Check Number Summary
Check Number Vendor No Vendor Name Check Date Void Amount Check Amount
134321 bercas BERGERSON CASWELL INC 09 27 2007 0 00 46 840 00
134322 BeutJohn John Jennifer Beutz 09 27 2007 0 00 1 000 00
134323 borsta BORDER STATES ELECTRIC SUPPLY 09 27 2007 0 00 83842
134324 boybui BOYER BUILDING CORPORATION 09 27 2007 0 00 1 500 00
134325 cartre CARVER COUNTY TREASURER 09 27 2007 0 00 95 950 00
134326 catpar CATCO PARTS SERVICE 09 27 2007 0 00 32 62
134327 c1asaf CLAREY S SAFETY EQUIPMENT INC 09 27 2007 0 00 77642
134328 COLCON COLSON CONSTRUCTION INC 09 27 2007 0 00 1 500 00
134329 CULLIG CULLIGAN 09 27 2007 0 00 10 20
134330 enfijoe JOE ENFIELD 09 27 2007 0 00 180 89
134331 engwat Engel Water Testing Inc 09 27 2007 0 00 350 00
134332 ernst Ernst Associates 09 27 2007 0 00 946 60
134333 exeoce Executive Ocean Inc 09 27 2007 0 00 1757
134334 facmot FACTORY MOTOR PARTS COMPANY 09 272007 0 00 722 20
134335 froplu FRONTLINE PLUS FIRE RESCUE 09 27 2007 0 00 870 00
134336 HamiMich MICHAEL HAMILTON 09 27 2007 0 00 572 00
134337 hentec HENNEPIN TECHNICAL COLLEGE 09 27 2007 0 00 678 14
134338 hoffiodd TODD HOFFMAN 09 272007 0 00 84 39
134339 ICMART ICMA RETIREMENT AND TRUST 457 09 27 2007 0 00 1 840 00
134340 j ertra JERRY S TRANSMISSION SER 09 27 2007 0 00 33445
134341 kilele KILLMER ELECTRIC CO INC 09 27 2007 0 00 4 348 55
134342 kinddebr DEBRA KIND 09 27 2007 0 00 600 00
134343 laneq 1 Lano Equipment 09 27 2007 0 00 2 092 73
134344 lawlbret Brett Lawler 09 27 2007 0 00 89 24
134345 LindErik ERIK LINDEMEIER 09 27 2007 0 00 88 00
134346 metcla Metro Classic Homes Inc 09 27 2007 0 00 1 250 00
134347 mincon MINNESOTA CONWAY 09 27 2007 0 00 305 99
134348 MNCHIL MN CHILD SUPPORT PAYMENT CTR 09 27 2007 0 00 452 23
134349 mnlife MINNESOTA LIFE 09 27 2007 0 00 1 461 99
134350 MSRS MSRS 09 27 2007 0 00 2 497 16
134351 mtidis MTI DISTRIBUTING INC 09 27 2007 0 00 447 17
134352 nahashel Shelley Nahan 09 27 2007 0 00 250 00
134353 NA TRET NATIONWIDE RETIREMENT SOLUTION 09 27 2007 0 00 5 677 09
134354 norpum North Star Pump Service 09 27 2007 0 00 760 00
134355 oerarc Oertel Architects 09 27 2007 0 00 1 800 00
134356 offmax OFFICE MAX 09 27 2007 0 00 1170
134357 petboy Pete Boyer Construction 09 27 2007 0 00 500 00
134358 petematt MATT PETERS 09 27 2007 0 00 250 38
134359 ponpa1 Pony Pals 09 27 2007 0 00 265 00
134360 prosel Promotion Select 09 272007 0 00 39953
134361 PRTURF PRO TURF 09 27 2007 0 00 1 311 75
134362 pummet PUMP AND METER SERVICES INC 09 27 2007 0 00 109 30
134363 ReedKati Katie Reed 09 27 2007 0 00 138 71
134364 rylhom Ryland Homes 09 27 2007 0 00 500 00
134365 Schcom Schwickert Company 09 27 2007 0 00 103 75
134366 srnben SM HENTGES SONS 09 27 2007 0 00 839 583 66
134367 steman STEPP MANUFACTURING 09 27 2007 0 00 361 22
134368 sticgreg GREG STICHA 09 27 2007 0 00 14648
134369 tancon TAN Construction LLC 09 27 2007 0 00 500 00
134370 target TARGET 09 27 2007 0 00 19 13
134371 tecgra TECHNAGRAPHICS 09 272007 0 00 176 02
134372 tridim TRI DIM FILTER CORP 09 27 2007 0 00 5 064 14
134373 UB 00090 LORI ANN BOTTENFIELD 09 27 2007 0 00 82 98
134374 UB 00091 Country Clean 09 27 2007 0 00 11 27
134375 UB OOO92 LESLIE KELLY 09 27 2007 0 00 1143
134376 UB 00093 TOWN AND COUNTRY HOMES 09 27 2007 0 00 14 75
134377 UB 00094 TOWN AND COUNTRY HOMES 0927 2007 0 00 699 71
134378 UB 00095 TOWN AND COUNTRY HOMES 09 27 2007 0 00 13 17
134379 UNIWA Y UNITED WAY 09 27 2007 0 00 42 00
134380 ustoy US TOY CO 09 27 2007 0 00 113 28
134381 verizo VERIZON WIRELESS 09 27 2007 0 00 6 14
134382 washdani DANIELLE WASHBURN 09 272007 0 00 9118
Page 2
417
CITY OF CHANHASSEN
User danielle
Accounts Payable
Checks by Date Summary by Check Number
Check Number Vendor No Vendor Name
134383 wsdar WS DARLEY CO
134384 xcel XCEL ENERGY INC
Check Date
09 27 2007
09 27 2007
Report Total
Printed 09 28 2007 I 1 41
Summary
Void Amount
0 00
0 00
0 00
Check Amount
47054
17 263 64
1 194 448 89
Page 3
418
CITY OF CHANHAS
User danielle
10 000 Lakes Chapter
10000 10 000 Lakes Chapter
Ck 134259 09 20 07
InY 091907
Line Item Date
09 19 07
Iny 091907 Total
Ck 134259 Total
10000
10 000 Lakes Chapter
3D SPECIALTIES
3dspe 3D SPECIALTIES
Ck 134260 09 20 07
InY 425149
Line Item Date
08 3107
Iny 425149 Total
Ck 134260 Total
3dspe
3D SPECIALTIES
Line Item Description
Building department seminar
10 000 Lakes Chapter
Line Item Description
Telespar
3D SPECIALTIES
A TOUCH OF MAGIC
atou A TOUCH OF MAGIC
Ck 134319 09 27 07
Iny 4208
Line Item Date
09 26 07
Iny 4208 Total
Ck 134319 Total
atou
A TOUCH OF MAGIC
Line Item Description
Halloween Party entertainment
A TOUCH OF MAGIC
A I ELECTRIC SERVICE
alele A I ELECTRIC SERVICE
Ck 134261 09 20 07
InY 13190
Line Item Date
08 3107
Iny 13190 Total
InY 13191
Line Item Date
08 3107
Iny 13191 Total
InY 13193
Line Item Date
08 3107
Line Item Description
Replace control panel LS 18
Line Item Description
Check wells 3 and 9
Line Item Description
Wire air conditioners Well 2 5 6 11
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
Line Item Account
101 1250 4370 700 00
700 00
700 00
700 00
700 00
Line Item Account
101 1320 4560 403 54
403 54
40354
403 54
403 54
Line Item Account
101 1614 4300 262 50
262 50
262 50
262 50
262 50
Line Item Account
701 0000 4530 1 887 27
1 887 27
Line Item Account
700 0000 4550 113 75
113 75
Line Item Account
700 0000 4510 926 54
Page I
419
ALL TIME FAVORITES
alltim ALL TIME FAVORITES
Ck 134262 09 20 07
Inv 40104
Line Item Date
0916 07
Inv 40104 Total
ALTERNATOR REBUILD CO
altreb AL TERNA TOR REBUILD CO
Ck 134317 09 27 07
Inv 39866
Line Item Date
0919 07
Inv 39866 Total
CITY OF CHANHAS
User danielle
Jnv 13193 Total
Inv 13194
Line Item Date
08 3107
Inv 13194 Total
Inv 13195
Line Item Date
08 3107
Inv 13195 Total
Inv 13196
Line Item Date
08 31 07
Inv 13196 Total
Jnv 13197
Line Item Date
08 3107
Jnv 13197 Total
Ck 134261 Total
aleJe
A I ELECTRIC SERVICE
Ck 134262 Total
alltim
ALL TIME FAVORITES
Ck 134317 Total
altreb
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Line Item Description
Move customer garage service conduit
Amount
926 54
Line Item Account
601 6016 4300 231 80
231 80
Line Item Account
700 0000 4552 407 00
407 00
Line Item Account
701 0000 4553 16250
16250
Line Item Account
700 0000 4552 65 00
65 00
3 793 86
3 793 86
3 793 86
Line Item Description
Install temporary line starter Well 9
Line Item Description
Wire in rental generator LS 27
Line Item Description
Rewire controls well 9
A I ELECTRIC SERVICE
Line Item Description
Barnyard Boogey event
Line Item Account
101 1711 4300 275 00
275 00
275 00
ALL TIME FAVORITES 275 00
275 00
Line Item Description
Alternator
Line Item Account
101 1320 4120 18344
18344
18344
ALTERNATOR REBUILD CO 183 44
ALTERNATOR REBUILD CO 183 44
Page 2
420
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
AMERICAN SOLUTIONS
amesol AMERICAN SOLUTIONS
Ck 134263 09 20 07
Inv 3113413
Line Item Date Line Item Description
09 06 07 Utility bill envelopes
09 06 07 Utility bill envelopes
Inv 3113413 Total
Line Item Account
700 0000 4340
701 0000 4340
384 61
384 61
769 22
Ck 134263 Total 769 22
amesol AMERICAN SOLUTIONS 769 22
AMERICAN SOLUTIONS 769 22
ANCOM TECHNICAL CENTER
anctec ANCOM TECHNICAL CENTER
Ck 134264 09 20 07
Inv 74855
Line Item Date Line Item Description
09 07 07 Cable antenna
Inv 74855 Total
Line Item Account
101 1220 4140 32 75
32 75
Ck 134264 Total 32 75
Ck 134318
Inv 46462
Line Item Date
09 2107
Inv 46462 Total
09 27 07
Line Item Description
Pagers
Line Item Account
101 1220 4120 2 131 54
2 131 54
Inv 75014
Line Item Date
09 25 07
Inv 75014 Total
Line Item Description
Pager repairs
Line Item Account
101 1220 4531 223 74
223 74
Ck 134318 Total 2 355 28
anctec ANCOM TECHNICAL CENTER 2 388 03
ANCOM TECHNICAL CENTER 2 388 03
APACHE GROUP
apagro APACHE GROUP
Ck 134265 09 20 07
Inv 116139
Line Item Date
0912 07
Inv 116139 Total
Line Item Description
Paper towels bath tissue
Line Item Account
101 1170 4150 638 80
638 80
Ck 134265 Total 638 80
apagro APACHE GROUP 638 80
APACHE GROUP 638 80
Page 3
421
Applied Ecological Services In
appeco Applied Ecological Services In
Ck 134266 09 20 07
Iny 15975
Line Item Date
08 3 I07
Iny 15975 Total
CITY OF CHANHAS
User danielle
Ck 134266 Total
appeco
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
Line Item Description
Chanhassen shoreline mowing spraying
Line Item Account
720 0000 4300 600 00
600 00
600 00
Applied Ecological Services In 600 00
Applied Ecological Services In 600 00
AUTOMOTIVE UNLIMITED
autunl AUTOMOTIVE UNLIMITED
Ck 134267 09 20 07
Iny 58607
Line Item Date
081 3 07
Iny 58607 Total
Ck 134267 Total
autunl
Line Item Description
Front wheel alignment
Line Item Account
101 1550 4530 89 65
89 65
89 65
AUTOMOTIVE UNLIMITED 89 65
AUTOMOTIVE UNLIMITED 89 65
BANNFORMSTECHNOLOGY
banfor BANN FORMS TECHNOLOGY
Ck 134268 09 20 07
Iny 14052
Line Item Date
0914 07
Iny 14052 Total
Ck 134268 Total
banfor
Line Item Description
Cert of Occupancy forms
Line Item Account
101 1250 4340 754 03
754 03
754 03
BANN FORMS TECHNOLOGY 754 03
BANNFORMSTECHNOLOGY 754 03
BENIEK PROPERTY SERVICES INC
benpro BENIEK PROPERTY SERVICES INC
Ck 134320 09 27 07
Iny 130643
Line Item Date
09 18 07
Iny 130643 Total
Ck 134320 Total
benpro
Line Item Description
Mowing and trimming
Line Item Account
101 1260 4300 106 50
106 50
106 50
BENIEK PROPERTY SERVICES INC 106 50
BENIEK PROPERTY SERVICES INC 106 50
Page 4
422
CITY OF CHANHAS
User danielle
BERG JOE
bergjoe BERG JOE
Ck 134269 09 20 07
Inv 091107
Line Item Date
09 1107
Inv 091107 Total
Ck 134269 Total
bergjoe
BERG JOE
Line Item Description
Reimburse text books
BERG JOE
BERGERSON CASWELL INC
bercas BERGERSON CASWELL INC
Ck 134321 09 27 07
Inv 4587A
Line Item Date
0913 07
Inv 4587A Total
Inv 4590A
Line Item Date
0913 07
Inv 4590A Total
Ck 134321 Total
bercas
Line Item Description
Well Pump Failure 2
Line Item Description
Well Pump 6 repairs
Accounts Payable
Check Detail Report Detail
Printed 0928 07 11 41
Amount
Line Item Account
101 1220 4370 155 00
155 00
155 00
155 00
155 00
Line Item Account
700 0000 4552 34402 50
34402 50
Line Item Account
700 0000 4552 12 43750
12437 50
46 840 00
BERGERSON CASWELL INC
BERGERSON CASWELL INC 46 840 00
Beutz John Jennifer
beutjohn Beutz John Jennifer
Ck 134270 09 20 07
Inv 9840deer
Line Item Date Line Item Description
0919 07 Erosion control escrow
Inv 9840deer Total
Ck 134270 Total
Ck 134322
Inv 9840
Line Item Date
09 26 07
Inv 9840 Total
Ck 134322 Total
BeutJohn
Beutz John Jennifer
09 27 07
Line Item Description
Erosion escrow 9840 Deerbrook
Beutz John Jennifer
46 840 00
Line Item Account
815 8202 2024 500 00
500 00
500 00
Line Item Account
815 8202 2024 1 000 00
1 000 00
1 000 00
1 500 00
1 500 00
Page 5
423
CITY OF CHANHAS
User danielIe
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I 1 41
Amount
BORDER STATES ELECTRIC SUPPLY
borsta BORDER STATES ELECTRIC SUPPLY
Ck 134271 09 20 07
Iny 96933095
Line Item Date Line Item Description
09 07 07 Sales tax credit not taken prior
Iny 96933095 Total
Line Item Account
101 1220 4510 0 67
0 67
Iny 969555 I 3
Line Item Date Line Item Description
09 13 07 Fluorescent lamps
Iny 96955513 Total
Line Item Account
101 1220 4510 366 73
366 73
Ck 134271 Total 366 06
Ck 134323 09 27 07
Iny 96939248
Line Item Date Line Item Description
091 0 07 Clear bulbs
Iny 96939248 Total
Line Item Account
101 1350 4120 613 87
613 87
Iny 96939249
Line Item Date Line Item Description
09 10 07 Bulbs
Iny 96939249 Total
Line Item Account
101 1350 4120 147 72
147 72
InY 96980131
Line Item Date Line Item Description
09 19 07 Bulbs
Iny 9698013 I Total
Line Item Account
101 1170 4510 76 83
76 83
Ck 134323 Total 83842
borsta BORDER STATES ELECTRIC SUPPLY 1 204 48
BORDER STATES ELECTRIC SUPPLY 1 204 48
BOTTENFIELD LORI ANN
UB 00090 BOTTENFIELD LORI ANN
Ck 134373 09 27 07
Iny
Line Item Date
09 26 07
09 26 07
09 26 07
09 26 07
Iny Total
Line Item Description
Refund check
Refund check
Refund check
Refund check
Line Item Account
700 0000 2020
720 0000 2020
701 0000 2020
700 0000 2020
0 99
3 86
33 04
45 09
82 98
Ck 134373 Total 82 98
UB 00090 BOTTENFIELD LORI ANN 82 98
BOTTENFIELD LORI ANN 82 98
Page 6
424
CITY OF CHANHAS
User danieIle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I I 4 I
Amount
BOYER BUILDING CORPORATION
boybui BOYER BUILDING CORPORATION
Ck 134324 09 27 07
Iny 200700272
Line Item Date Line Item Description
09 24 07 As built escrow 4051 Pipewood Ln
Iny 200700272 Total
Line Item Account
8 I 5 8226 2024 1 500 00
1 500 00
Ck 134324 Total 1 500 00
boybui BOYER BUILDING CORPORATION 1 500 00
BOYER BUILDING CORPORATION 1 500 00
BROADCAST MUSIC INC
BROMUS BROADCAST MUSIC INC
Ck 134272 09 20 07
Iny 0712 FIT I
Line Item Date
0919 07
Iny 0712 FIT I
Line Item Description
Music license fee
Total
Line Item Account
101 1532 4130 29040
29040
Ck 134272 Total 29040
BROMUS BROADCAST MUSIC INC 290 40
BROADCAST MUSIC INC 290 40
CALICO
calico CALICO
Ck 134273 09 20 07
Iny 14494
Line Item Date
08 30 07
Iny 14494 Total
Line Item Description
Temporary tattoos
Line Item Account
101 1220 4375 129 50
129 50
Ck 134273 Total 12950
calico CALICO 129 50
CALICO 129 50
CARVER COUNTY RED CROSS
carred CARVER COUNTY RED CROSS
Ck 134274 09 20 07
Iny 110
Line Item Date
08 20 07
Iny 1 10 Total
Line Item Description
Babysitter training
Line Item Account
101 1731 4300 389 50
389 50
Ck 134274 Total 389 50
carred CARVER COUNTY RED CROSS 389 50
CARVER COUNTY RED CROSS 389 50
Page 7
425
CITY OF CHANHAS
User danieIle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
CARVER COUNTY TREASURER
cartre CARVER COUNTY TREASURER
Ck 134325 09 27 07
InY 47939
Line Item Date Line Item Description
09119 07 2007 assessment contract
InY 47939 Total
Line Item Account
101 1150 4300 95 950 00
95 950 00
Ck 134325 Total 95 950 00
cartre CARVER COUNTY TREASURER 95 950 00
CARVER COUNTY TREASURER 95 950 00
CATCO PARTS SERVICE
catpar CATCO PARTS SERVICE
Ck 134326 09 27 07
Iny 3 37574
Line Item Date Line Item Description
09 24 07 End yoke
InY 3 37574 Total
Line Item Account
101 1320 4140 32 62
32 62
Ck 134326 Total 32 62
catpar CATCO PARTS SERVICE 32 62
CATCO PARTS SERVICE 32 62
CENTERPOINT ENERGY MINNEGASCO
cenene CENTERPOINT ENERGY MINNEGASCO
Ck 134275 09 20 07
InY 090707
Line Item Date
09 07 07
09 07 07
09 07 07
09 07 07
09 07 07
09 07 07
Iny 090707 Total
Line Item Descriotion
Gas charges
Gas charges
Gas charges
Gas charges
Gas charges
Gas charges
Line Item Account
700 0000 4320
701 0000 4320
101 1551 4320
101 1370 4320
101 1530 4320
101 1220 4320
1 60
1 60
10 12
12 78
22 17
115 85
164 12
Ck 134275 Total 164 12
cenene CENTERPOINT ENERGY MINNEGASCO 164 12
CENTERPOINT ENERGY MINNEGASCO 164 12
CLAREY S SAFETY EQUIPMENT INC
c1asaf CLAREY S SAFETY EQUIPMENT INC
Ck 134327 09 27 07
Iny 112832
Line Item Date
09 21 07
Iny 112832 Total
Line Item Description
Extrication gloyes
Line Item Account
400 4105 4705 77642
77642
Ck 134327 Total 77642
c1asaf CLAREY S SAFETY EQUIPMENT INC 776 42
Page 8
426
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
CLAREY S SAFETY EQUIPMENT INC
Amount
776 42
COLSON CONSTRUCTION INC
COLCON COLSON CONSTRUCTION INC
Ck 134328 09 27 07
InY 200402476
Line Item Date Line Item Description
09 24 07 As built 4021 Pipewood Lane
Iny 200402476 Total
Line Item Account
815 8226 2024 1 500 00
1 500 00
Ck 134328 Total 1 500 00
COLCON COLSON CONSTRUCTION INC 1 500 00
COLSON CONSTRUCTION INC 1 500 00
CORPORATE EXPRESS
corexp CORPORATE EXPRESS Account 101 1170 4110
Ck 134276 09 20 07
Iny 81334875
Line Item Date Line Item Description
09 04 07 Return paper
Iny 81334875 Total
Line Item Account
101 1170 4110 56 71
56 71
Iny 81400827
Line Item Date Line Item Description
09 06 07 Stapler protector sheets
Iny 81400827 Total
Line Item Account
101 1170 4110 79 01
79 01
Ck 134276 Total 22 30
corexp CORPORATE EXPRESS 22 30
CORPORATE EXPRESS 22 30
Country Clean
UB 00091 Country Clean
Ck 134374 09 27 07
Iny
Line Item Date Line Item Description
09 26 07 Refund check
Iny Total
Line Item Account
701 0000 2020 11 27
11 27
Ck 134374 Total 11 27
UB 00091 Country Clean 1127
Country Clean 11 27
CUB FOODS
cubfoo CUB FOODS
Ck 134277 09 20 07
Iny 082707
Line Item Date
09 19 07
Iny 082707 Total
Line Item Description
Food for meeting
Line Item Account
101 1220 4370 21 74
21 74
Page 9
427
CITY OF CHANHAS
User danieIle
Ck 134277 Total
cubfoo CUB FOODS
CUB FOODS
CULLIGAN
CULLIG CULLIGAN
Ck 134329 09 27 07
Inv 2007 023 I 6
Line Item Date Line Item Description
09 25 07 Refund 8024 Autumn Ridge Way
Inv 2007 023 I 6 Total
Ck 134329 Total
CULLIG CULLIGAN
CULLIGAN
Delta Dental
delden Delta Dental
Ck 134278 09 20 07
Inv oct 2007
Line Item Date Line Item Description
0917 07 October dental premiums
0917 07 October dental premiums
09 17 07 October dental premiums
0917 07 October dental premiums
09 17 07 October dental premiums
Inv oct 2007 Total
Ck 134278 Total
delden Delta Dental
Delta Dental
DYNAMEX DELIVERS NOW
dyname DYNAMEX DELIVERS NOW
Ck 134279 09 20 07
Inv 1306162
Line Item Date Line Item Description
0913 07 Delivery charges
Inv 1306162 Total
Ck 134279 Total
dyname DYNAMEX DELIVERS NOW
DYNAMEX DELIVERS NOW
EARL F ANDERSEN INC
earand EARL F ANDERSEN INC
Ck 134280 09 20 07
Inv 79180
Line Item Date
08 3107
Line Item Description
6 street sign plates
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
21 74
21 74
2174
Line Item Account
101 1250 4901 10 20
10 20
10 20
10 20
10 20
Line Item Account
720 0000 2013
210 0000 2013
701 0000 2013
700 0000 2013
101 0000 2013
4 28
6 06
11846
142 70
896 26
1 159 20
1 159 20
1 159 20
1 159 20
Line Item Account
101 1310 4300 94 50
94 50
94 50
94 50
94 50
Line Item Account
101 1320 4560 47 38
Page 10
428
CITY OF CHANHAS
User danieIle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 4 I
Iny 79180 Total
Amount
47 38
Ck 134280 Total 47 38
earand EARL F ANDERSEN INC 47 38
EARL F ANDERSEN INC 47 38
EDEN PRAIRIE SCHOOL DIST 272
EDEPRA EDEN PRAIRIE SCHOOL DIST 272
Ck 13428 I 09 20 07
Iny 8 0231529
Line Item Date Line Item Description
09 1 J 07 Facility rental for Dance For Fun
Iny 8 0231529 Total
Line Item Account
101 1534 3631 2 978 65
2 978 65
Ck 134281 Total 2 978 65
EDEPRA EDEN PRAIRIE SCHOOL DIST 272 2 978 65
EDEN PRAIRIE SCHOOL DIST 272 2 978 65
EHLERS ASSOCIATES INC
ehlers EHLERS ASSOCIATES INC
Ck 134282 09 20 07
InY 335544
Line Item Date Line Item Description
091 0 07 TIF calculations for dinner theatre
Iny 335544 Total
Line Item Account
491 4301 4300 315 00
315 00
InY 3385545
Line Item Date Line Item Description
09 10 07 Utility rate study
Inv 3385545 Total
Line Item Account
700 00004300 90 00
90 00
Ck 134282 Total 405 00
ehlers EHLERS ASSOCIATES INC 405 00
EHLERS ASSOCIATES INC 405 00
Electronic Installations Inc
Elecin Electronic Installations Inc
Ck 134283 09 20 07
Inv 2007 02211
Line Item Date
0914 07
Inv 2007 02211
Line Item Description
Refund overpayment 1822 Colonial Ln
Total
Line Item Account
101 1250 4901 5 76
5 76
Ck 134283 Total 5 76
Elecin Electronic Installations Inc 5 76
Electronic Installations Inc 5 76
Page II
429
CITY OF CHANHAS
User danieIle
ENFIELD JOE
enfijoe ENFIELD JOE
Ck 134330 09 27 07
Inv 092407
Line Item Date
09 24 07
Inv 092407 Total
Ck 134330 Total
enfijoe
ENFIELD JOE
Line Item Description
Reimburse boat supplies Fire Dept
ENFIELD JOE
Engel Water Testing Ine
engwat Engel Water Testing Inc
Ck 134331 09 27 07
Inv 07 4189
Line Item Date Line Item Description
08 23 07 Water sample testing
Inv 07 4189 Total
Ck 134331 Total
engwat
Engel Water Testing Ine
Ernst Associates
ernst Ernst Associates
Ck 134284 09 20 07
Inv 7456
Line Item Date
09 04 07
Inv 7456 Total
Ck 134284 Total
Ck 134332
Inv 7464
Line Item Date
09 17 07
Inv 7464 Total
Ck 134332 Total
ernst
Ernst Associates
Engel Water Testing Ine
Line Item Description
Chanhassen Pioneer Cemetery
09 27 07
Line Item Description
Chanhassen Pioneer Cemetery
Ernst Associates
Executive Ocean Ine
exeoce Executive Ocean Inc
Ck 134333 09 27 07
Inv 18314
Line Item Date
09 07 07
Inv 18314 Total
Line Item Description
Engraving fishing plates
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
Line Item Account
101 1220 4120 180 89
180 89
180 89
180 89
180 89
Line Item Account
700 0000 4300 350 00
350 00
350 00
350 00
350 00
Line Item Account
400 4142 4300 1 717 60
1 717 60
1 717 60
Line Item Account
400 4142 4300 946 60
946 60
946 60
2 664 20
2 664 20
Line Item Account
10 1 1600 4300 17 57
17 57
Page 12
430
CITY OF CHANHAS
User danielIe
Ck 134333 Total
exeoce Executive Ocean Inc
Executive Ocean Inc
FACTORY MOTOR PARTS COMPANY
facmot FACTORY MOTOR PARTS COMPANY
Ck 134334 09 27 07
Inv 1 2707573
Line Item Date Line Item Description
09J 4 07 Battery
09J 4 07 Battery
09J 4 07 Battery
Inv 1 2707573 Total
Inv 6 973573
Line Item Date Line Item Description
09 2 I07 Marine battery
09 2 I07 Battery
Inv 6 973573 Total
Ck 134334 Total
facmot
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I 1 4 I
Amount
17 57
17 57
17 57
Line Item Account
101 1320 4140
101 I 250 4 140
101 1550 4140
83 23
92 57
290 84
466 64
Line Item Account
101 1550 4120
700 0000 4120
6166
193 90
255 56
722 20
FACTORY MOTOR PARTS COMPANY
722 20FACTORYMOTORPARTSCOMPANY
Ferraro Holly
FerrHoIl Ferraro Holly
Ck 134285 09 20 07
Inv 2000793 002
Line Item Date Line Item Description
09J 9 07 Refund dance
Inv 2000793 002 Total
Ck 134285 Total
FerrHoIl Ferraro Holly
Ferraro Holly
FRONTLINE PLUS FIRE RESCUE
froplu FRONTLINE PLUS FIRE RESCUE
Ck 134335 09 27 07
Inv 10240
Line Item Date Line Item Description
09J 9 07 Class A foam
Inv 10240 Total
Ck 134335 Total
froplu
722 20
Line Item Account
10 I 1534 363 I 65 00
65 00
65 00
65 00
65 00
Line Item Account
101 1220 4120 870 00
870 00
870 00
FRONTLINE PLUS FIRE RESCUE
FRONTLINE PLUS FIRE RESCUE
870 00
870 00
Page 13
431
CITY OF CHANHAS
User danielle
GMH ASPHALT CORP
gmhasp GMH ASPHALT CORP
Ck 134286 09 20 07
Inv 3
Line Item Date
08 3107
Inv 3 Total
Ck 134286 Total
gmhasp
GMH ASPHALT CORP
Line Item Description
2007 Street improvements
GMH ASPHALT CORP
GOPHER SIGN COMPANY
gopsig GOPHER SIGN COMPANY
Ck 134287 09 20 07
Inv 72462
Line Item Date
08 3107
Inv 72462 Total
Ck 134287 Total
gopsig
Line Item Description
No parking signs
GOPHER SIGN COMPANY
GOPHER SIGN COMPANY
GOPHER STATE ONE CALL INC
GOPST A GOPHER STATE ONE CALL INC
Ck 134288 09 20 07
Inv 7080365
Line Item Date Line Item Description
08 3107 August locates
Inv 7080365 Total
Ck 134288 Total
GOPST A
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I 1 41
Amount
Line Item Account
601 6017 4751 37 231 24
37 231 24
37 231 24
37 231 24
37 231 24
Line Item Account
101 I 320 4560 389 97
389 97
389 97
389 97
389 97
Line Item Account
400 0000 4300 913 65
913 65
913 65
GOPHER STATE ONE CALL INC
GOPHER STATE ONE CALL INC
913 65
HAMILTON MICHAEL
HamiMich HAMILTON MICHAEL
Ck 134336 09 27 07
Inv 4203
Line Item Date
09 24 07
Inv 4203 Total
Ck 134336 Total
HamiMich
HAMILTON MICHAEL
Line Item Description
Replace lost check
HAMILTON MICHAEL
913 65
Line Item Account
101 1767 4300 572 00
572 00
572 00
572 00
572 00
Page 14
432
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I 1 4 I
Amount
HANSEN THORP PELLINEN OLSON
hantho HANSEN THORP PELLINEN OLSON
Ck 134289 09 20 07
InY 16513
Line Item Date
091 0 07
Iny 16513 Total
InY 16515
Line Item Date
09 10 07
Iny 16515 Total
Iny 16570
Line Item Date
09110 07
Iny 16570 Total
Iny 16576
Line Item Date
09110 07
Iny 16576 Total
Iny 16577
Line Item Date
091 0 07
Iny 16577 Total
Iny 16578
Line Item Date
091 0 07
Iny 16578 Total
Ck 134289 Total
hantho
Line Item Description
Goers culyert
Line Item Account
720 0000 4300 1 196 02
1 196 02
Line Item Account
720 0000 4300 4 498 90
4 498 90
Line Item Account
410 0000 4300 4 733 50
4 73350
Line Item Account
400 0000 1155 441 75
441 7 5
Line Item Account
400 0000 1155 1 348 50
1 348 50
Line Item Account
400 0000 1155 2 371 50
2 371 50
14 590 17
14 590 17
14 590 17
Line Item Description
Lake Riley Woods
Line Item Description
Lk Ann picnic shelter ballfield light
Line Item Description
Hidden Creek Meadows
Line Item Description
Stonefield
Line Item Description
Frontier 3rd Addition
HANSEN THORP PELLINEN OLSON
HANSEN THORP PELLINEN OLSON
HAWKINS CHEMICAL
hawche HAWKINS CHEMICAL
Ck 134290 09 20 07
Iny 1108456
Line Item Date Line Item Description
08 3107 Chlorine cylinders
Iny 1108456 Total
HENNEPIN TECHNICAL COLLEGE
hentec HENNEPIN TECHNICAL COLLEGE
Ck 134337 09 27 07
Iny 136593
Line Item Date
09118 07
Ck 134290 Total
hawche
HAWKINS CHEMICAL
Line Item Account
700 0000 4160 60 00
60 00
60 00
HAWKINS CHEMICAL 60 00
60 00
Line Item Description
Firefighter classes
Line Item Account
101 1220 4370 678 14
Page 15
433
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I I 41
Inv 136593 Total
Amount
678 14
Ck 134337 Total 678 14
hen tee HENNEPIN TECHNICAL COLLEGE 678 14
HENNEPIN TECHNICAL COLLEGE 678 14
HIDDEN FENCE OF MINNESOTA
hidfen HIDDEN FENCE OF MINNESOTA
Ck 13429 I 09 20 07
Inv 1740 Wood
Line Item Date Line Item Description
091 9 07 1740 Wood Duck Circle repairs
Inv 1740 Wood Total
Line Item Account
601 6016 4300 108 00
108 00
Ck 134291 Total 108 00
hidfen HIDDEN FENCE OF MINNESOTA 108 00
HIDDEN FENCE OF MINNESOTA 108 00
HOFFMAN TODD
hofftodd HOFFMAN TODD
Ck 134338 09 27 07
Inv 0907
Line Item Date
09 26 07
Inv 0907 Total
Line Item Description
Mileage reimbursement
Line Item Account
101 1520 4380 84 39
84 39
Ck 134338 Total 84 39
hofftodd HOFFMAN TODD 84 39
HOFFMAN TODD 84 39
HOISINGTON KOEGLER GROUP
hoikoe HOISINGTON KOEGLER GROUP
Ck 134292 09 20 07
Inv 07 14
Line Item Date
08 3107
Inv 07 14 Total
Line Item Description
Parks mapping
Line Item Account
410 0000 4300 3 260 00
3 260 00
Inv 07 33
Line Item Date
08 3107
Inv 07 33 Total
Line Item Description
Park Plan update
Line Item Account
410 0000 4300 4 550 00
4 550 00
Ck 134292 Total 7 810 00
hoikoe HOISINGTON KOEGLER GROUP 7 810 00
HOISINGTON KOEGLER GROUP 7 810 00
Page 16
434
ICMA RETIREMENT AND TRUST 457
ICMART ICMA RETIREMENT AND TRUST 457
Ck 134339 09 27 07
Inv
Line Item Date
09 24 07
09 24 07
09 24 07
Inv Total
CITY OF CHANHAS
User danielle
Ck 134339 Total
ICMART
Accounts Payable
Check Detail Report Detail
Printed 09128 07 I 1 41
Amount
Line Item Description
PR Batch 428 9 2007 ICMA
PR Batch 428 9 2007 ICMA
PR Batch 428 9 2007 ICMA
Line Item Account
210 0000 2009
720 0000 2009
101 0000 2009
31 25
100 00
1 708 75
1 840 00
1 840 00
ICMA RETIREMENT AND TRUST 457 1 840 00
ICMA RETIREMENT AND TRUST 457 1 840 00
IMPERIAL PORTA PALACE
imppor IMPERIAL PORTA PALACE
Ck 134293 09 20 07
Inv 5694
Line Item Date
09 07 07
Inv 5694 Total
Inv 5695
Line Item Date
09 07 07
Inv 5695 Total
Inv 5696
Line Item Date
09 07 07
Inv 5696 Total
Inv 5697
Line Item Date
09 07 07
Inv 5697 Total
Inv 5698
Line Item Date
09 07 07
Inv 5698 Total
Inv 5699
Line Item Date
09 07 07
Inv 5699 Total
Ck 134293 Total
imppor
Line Item Description
Rental and service parks
Line Item Account
101 1550 4400 1 492 07
1492 07
Line Item Account
101 1550 4400 284 36
28436
Line Item Account
101 1550 4400 73 75
73 75
Line Item Account
101 1550 4400 94 79
94 79
Line Item Account
10 1 1550 4400 1 393 02
1 393 02
Line Item Account
101 1550 4400 41743
41743
3 75542
3 75542
3 755 42
Line Item Description
Rental and service Round House beach
Line Item Description
Rental and service Sunset Ridge
Line Item Description
Rental and service soccer field
Line Item Description
Rental and service parks
Line Item Description
Rental and service 5 K race City Center
IMPERIAL PORTA PALACE
IMPERIAL PORTA PALACE
Page 17
435
CITY OF CHANHAS
User danieIle
INDOOR LANDSCAPES INC
indian INDOOR LANDSCAPES INC
Ck 134294 09 20 07
Inv 6898
Line Item Date
09 15 07
Inv 6898 Total
Ck 134294 Total
indian
Line Item Description
September plant service
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
Line Item Account
101 1170 4110 199 16
199 16
199 16
INDOOR LANDSCAPES INC
INDOOR LANDSCAPES INC
199 16
JERRY S TRANSMISSION SER
jertra JERRY S TRANSMISSION SER
Ck 134340 09 27 07
Inv 9823
Line Item Date
091 4 07
Inv 9823 Total
Ck 134340 Total
j ertra
Line Item Description
Auto eject
199 16
Line Item Account
101 1220 4140 33445
33445
33445
JERRY S TRANSMISSION SER
JERRY S TRANSMISSION SER
334 45
KELLY LESLIE
U8 00092 KELLY LESLIE
Ck 134375 09 27 07
Inv
Line Item Date
09 26 07
09 26 07
Inv Total
Ck 134375 Total
U8 00092
KELLY LESLIE
Line Item Description
Refund check
Refund check
KELLY LESLIE
KILLMER ELECTRIC CO INC
kilele KILLMER ELECTRIC CO INC
Ck 134341 09 27 07
Inv 091007
Line Item Date
091 0 07
Inv 091007 Total
Ck 134341 Total
kilele
Line Item Description
Repairs W 78th St Target
334 45
Line Item Account
700 0000 2020
720 0000 2020
2 33
9 10
1143
1143
1143
1143
Line Item Account
101 1350 4565 4 348 55
4 34855
4 348 55
KILLMER ELECTRIC CO INC
KILLMER ELECTRIC CO INC
4 348 55
4 348 55
Page 18
436
CITY OF CHANHAS
User danielle
KII1LEY HORN AND ASSOCIATES INC
kimhor KII1LEY HORN AND ASSOCIATES INC
Ck 134295 09 20 07
InY 3094212
Line Item Date Line Item Description
07 31 07 Hwy 212 related services
Iny 3094212 Total
Iny 3094213
Line Item Date Line Item Description
07 3107 2005 MUSA area expansion
InY 3094213 Total
Ck 134295 Total
kimhor
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
Line Item Account
463 4212 4300 1 330 63
1 330 63
Line Item Account
602 6014 4300 22 809 80
22 809 80
24 14043
KII1LEY HORN AND ASSOCIATES INC
KIMLEY HORN AND ASSOCIATES INC
24 14043
KIND DEBRA
kinddebr KIND DEBRA
Ck 134342 09 27 07
InY 091807
Line Item Date
0918 07
Iny 091807 Total
Ck 134342 Total
kinddebr
KIND DEBRA
Lano Equipment
laneql Lano Equipment
Ck 134343 09 27 07
Iny 12085
Line Item Date
08 29 07
Iny 12085 Total
Ck 134343 Total
laneql
Lano Equipment
Lawler Brett
lawlbret Lawler Brett
Ck 134344 09 27 07
InY 091407
Line Item Date
09 14 07
Iny 091407 Total
Ck 134344 Total
Line Item Description
Fall 2007 Maple Leaf
KIND DEBRA
Line Item Description
Industrial grapple bucket rental
Lano Equipment
Line Item Description
Mileage reimbursement
24 140 43
Line Item Account
101 1110 4340 600 00
600 00
600 00
600 00
600 00
Line Item Account
101 1550 4120 2 092 73
2 092 73
2 092 73
2 092 73
2 092 73
Line Item Account
101 1260 4370 89 24
89 24
89 24
Page 19
437
CITY OF CHANHAS
User danielle
lawlbret
Lawler Brett
Lawler Brett
LINDEMEIER ERIK
LindErik LINDEMEIER ERIK
Ck 134345 09 27 07
Iny 4203
Line Item Date
09 2107
Iny 4203 Total
Ck 134345 Total
LindErik
LINDEMEIER ERIK
Line Item Description
Adult softball umpire
LINDEMEIER ERIK
Mark Giesen Enterprises
margie Mark Giesen Enterprises
Ck 134296 09 20 07
InY 612184
Line Item Date
09 07 07
Iny 612184 Total
Ck 134296 Total
margie
Mark Giesen Enterprises
Line Item Description
Power Hill Park trail
Mark Giesen Enterprises
Metro Classic Homes Inc
metcla Metro Classic Homes Inc
Ck 134346 09 27 07
Iny 8714osprey
Line Item Date Line Item Description
09 26 07 Erosion escrow 8714 Osprey Ln
09 26 07 Landscape escrow 8714 Osprey Ln
Iny 87140sprey Total
Ck 134346 Total
metcla
Metro Classic Homes Inc
Metro Classic Homes Inc
llINNESOT A CONWAY
mincon MINNESOTA CONWAY
Ck 134347 09 27 07
Iny 362789
Line Item Date
09111 07
Iny 362789 Total
Ck 134347 Total
Line Item Description
Recharge fire extinguishers
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
89 24
89 24
Line Item Account
101 1767 4300 88 00
88 00
88 00
88 00
88 00
Line Item Account
410 0000 470 I 1 786 00
1 786 00
1 786 00
1 786 00
1 786 00
Line Item Account
815 8202 2024
815 8201 2024
500 00
750 00
1 250 00
1 250 00
1 250 00
1 250 00
Line Item Account
101 1370 4510 305 99
305 99
305 99
Page 20
438
CITY OF CHANHAS
User danielle
mineon MINNESOTA CONWAY
MINNESOTA CONWAY
MINNESOTA LIFE
mnlife MINNESOTA LIFE
Ck 134349 09 27 07
Iny oct2007
Line Item Date Line Item Description
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09120 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
09 20 07 October premiums
Iny oct2007 Total
Ck 134349 Total
mnlife MINNESOTA LIFE
MINNESOTA LIFE
MN CHILD SUPPORT PAYMENT CTR
MNCHIL MN CHILD SUPPORT PAYMENT CTR
Ck 134348 09 27 07
Iny
Line Item Date
09 24 07
09 24 07
09 24 07
Iny Total
Line Item Description
PR Batch 428 9 2007 Garnishment
PR Batch 428 9 2007 Garnishment
PR Batch 428 9 2007 Garnishment
Ck 134348 Total
MNCHIL
Accounts Payable
Check Detail Report Detail
Printed 0928 07 11 41
Amount
305 99
305 99
Line Item Account
720 0000 4040
210 0000 2011
101 1430 4040
720 7201 4040
720 7202 4040
101 1700 4040
101 1530 4040
10 1 1170 4040
101 1210 4040
210 0000 4040
101 1600 4040
101 1520 4040
101 1160 4040
101 1220 4040
700 0000 2011
701 0000 2011
101 1370 4040
101 1130 4040
701 0000 4040
10 1 1120 4040
101 1420 4040
700 0000 4040
101 1310 4040
101 1550 4040
101 1320 4040
101 1250 4040
101 0000 2011
13 92
0 17
3 78
4 92
4 92
4 94
10 32
11 76
14 16
1542
19 78
21 60
30 24
3198
38 24
38 24
4175
42 19
6003
66 66
6750
7203
85 98
101 82
10446
113 52
469 50
1 461 99
1 461 99
1 461 99
1 461 99
Line Item Account
701 0000 2006
10 1 0000 2006
700 0000 2006
9 63
34 61
407 99
452 23
452 23
MN CHILD SUPPORT PAYMENT CTR 452 23
Page 21
439
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
MN CHILD SUPPORT PAYMENT CTR
Amount
452 23
MSRS
MSRS MSRS
Ck 134350
Inv
Line Item Date
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
0924 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
09 24 07
Inv Total
Ck 134350 Total
MSRS
MSRS
09 27 07
Line Item Description
PR Batch 428 9 2007 Post Health 05 Emplr
PR Batch 428 9 2007 Post Health 3 Emplr
PR Batch 428 9 2007 Post Health 3 Emplr
PR Batch 428 9 2007 Post Health 05 Emplr
PR Batch 428 9 2007 Post Health 05 Emplr
PR Batch 428 9 2007 Post Health 05 Emplr
PR Batch 428 9 2007 Post Health 1 Emplr
PR Batch 428 9 2007 Post Health I Emplr
PR Batch 428 9 2007 Ret Health 5
PR Batch 428 9 2007 Post Health I Emplr
PR Batch 428 9 2007 Ret Health 3
PR Batch 428 9 2007 Ret Health 3
PR Batch 428 9 2007 Post Health 1 Emplr
PR Batch 428 9 2007 Post Health 2 Emplr
PR Batch 428 9 2007 Ret Health 5
PR Batch 428 9 2007 Ret Health 5
PR Batch 428 9 2007 Ret Health 5
PR Batch 428 9 2007 Post Health 2 Emplr
PR Batch 428 9 2007 Post Health 05 Emplr
PR Batch 428 9 2007 Post Health 3 Emplr
PR Batch 428 9 2007 Ret Health 1
PR Batch 428 9 2007 Post Health 5 Emplr
PR Batch 428 9 2007 Ret Health 1
PR Batch 428 9 2007 Post Health 2 Emplr
PR Batch 428 9 2007 Post Health 7 Emplr
PR Batch 428 9 2007 Ret Health 1
PR Batch 428 9 2007 Post Health 1 Emplr
PR Batch 428 9 2007 Ret Health 1
PR Batch 428 9 2007 Ret Health 2
PR Batch 428 9 2007 Ret Health 2
PR Batch 428 9 2007 Ret Health 5
PR Batch 428 9 2007 Ret Health 3
PR Batch 428 9 2007 Ret Health 5
PR Batch 428 9 2007 Ret Health 2
PR Batch 428 9 2007 Ret Health 7
PR Batch 428 9 2007 Ret Health 1
Line Item Account
210 0000 2016
700 0000 2016
701 0000 2016
701 0000 2016
700 0000 2016
720 0000 2016
210 0000 2016
720 0000 2016
210 0000 2016
700 0000 2016
701 0000 2016
700 0000 2016
701 0000 2016
701 0000 2016
701 0000 2016
700 0000 2016
720 0000 2016
700 0000 2016
101 0000 2016
10 1 0000 20 16
210 0000 2016
101 0000 2016
720 0000 2016
101 0000 2016
101 0000 2016
700 0000 2016
101 0000 2016
701 0000 2016
701 0000 2016
700 0000 2016
10 1 0000 20 16
101 0000 2016
101 0000 2016
10 1 0000 20 16
101 0000 2016
101 0000 2016
0 21
0 27
0 28
0 50
0 52
059
145
1 91
2 75
341
3 60
3 61
4 27
5 13
6 70
6 71
7 75
9 89
11 58
17 31
18 97
19 64
25 09
26 58
26 93
44 30
44 90
55 89
67 25
129 07
15907
226 17
256 68
347 51
352 01
608 66
2 497 16
2 497 16
MSRS 2 497 16
2 497 16
MTI DISTRIBUTING INC
mtidis MTI DISTRIBUTING INC
Ck 134351 09 27 07
Inv 594933 00
Line Item Date Line Item Description
0912 07 Tires
Inv 594933 00 Total
Line Item Account
101 1550 4120 368 02
368 02
Page 22
440
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
Inv 595542 00
Line Item Date Line Item Description
091 2 07 Rollers
Inv 595542 00 Total
Line Item Account
101 1550 4120 79 15
79 15
Ck 134351 Total 447 17
mtidis MTI DISTRIBUTING INC 447 17
MTI DISTRIBUTING INC 447 17
MX Logic
mxlog MX Logic
Ck 134297 09 20 07
Inv 117341
Line Item Date Line Item Description
09 19 07 SPAM service
Inv 117341 Total
Line Item Account
101 1160 4300 97 00
97 00
Ck 134297 Total 97 00
mxIog MX Logic 97 00
MX Logic 97 00
Nahan Shelley
nahashel Nahan Shelley
Ck 134352 09 27 07
Inv 2073 171
Line Item Date Line Item Description
09 2107 Babysitting training
Inv 2073 171 Total
Line Item Account
101 1731 4300 250 00
250 00
Ck 134352 Total 250 00
nahashel Nahan Shelley 250 00
Nahan Shelley 250 00
NATIONWIDE RETIREMENT SOLUTION
NA TRET NATIONWIDE RETIREMENT SOLUTION
Ck 134353 09 27 07
Inv
Line Item Date
09 24 07
09 24 07
09 24 07
09 24 07
Inv Total
Line Item Description
PR Batch 428 9 2007 Nationwide Retirement
PR Batch 428 9 2007 Nationwide Retirement
PR Batch 428 9 2007 Nationwide Retirement
PR Batch 428 9 2007 Nationwide Retirement
Line Item Account
720 0000 2009
700 0000 2009
701 0000 2009
101 0000 2009
50 00
335 82
38119
4 910 08
5 677 09
Ck 134353 Total 5 677 09
NATRET NA TIONWIDE RETIREMENT SOLUTION 5 677 09
NATIONWIDE RETIREMENT SOLUTION 5 677 09
Page 23
441
CITY OF CHANHAS
User danielle
North Star Pump Service
NorPum North Star Pump Service
Ck 134298 09 20 07
Iny 777
Line Item Date
091 0 07
Iny 777 Total
Ck 134298 Total
Ck 134354
Iny 795
Line Item Date
09 20 07
Iny 795 Total
Ck 134354 Total
norpum
North Star Pump Service
Oertel Architects
oerarc Oertel Architects
Ck 134355 09 27 07
Iny 053007
Line Item Date
05 30 07
Iny 053007 Total
Ck 134355 Total
oerarc
Oertel Architects
Line Item Description
Repairs at wastewater lift station
09 27 07
Line Item Description
Wastewater lift station seryice call
North Star Pump Service
Line Item Description
Public Works Planning Study
Oertel Architects
OFFICE MAX
offmax OFFICE MAX Account 101 1170 4110
Ck 134356 09 27 07
Iny 1102000043839
Line Item Date Line Item Description
08 20 07 Coyerstock
Iny 1102000043839 Total
Iny 532632
Line Item Date
05 3 I07
Iny 532632 Total
Iny 593310
Line Item Date
061 I07
Iny 593310 Total
Ck 134356 Total
offmax
Line Item Description
Binder coyer
Line Item Description
Binder coyer return
OFFICE MAX
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
Line Item Account
701 0000 4553 3 12350
3 123 50
3 123 50
Line Item Account
701 0000 4553 760 00
760 00
760 00
3 883 50
3 883 50
Line Item Account
700 7020 4300 1 800 00
1 800 00
1 800 00
1 800 00
1 800 00
Line Item Account
101 1170 4110 1170
1170
Line Item Account
101 1170 4110 9155
9155
Line Item Account
101 1170 4110 91 55
91 55
1170
1170
Page 24
442
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
OFFICE MAX
Amount
1170
PARTEK SUPPLY INC
parsup PARTEK SUPPLY INC
Ck 134299 09 20 07
Iny 20515
Line Item Date
07 24 07
Iny 20515 Total
Line Item Description
Draintile
Line Item Account
101 1550 4150 16241
16241
Iny 21103
Line Item Date
091 3 07
Iny 21103 Total
Line Item Description
Erosion blanket
Line Item Account
101 1550 4150 44 73
44 73
InY 21108
Line Item Date
091 3 07
Iny 21108 Total
Line Item Description
Erosion blanket
Line Item Account
101 1550 4150 341 60
341 60
Ck 134299 Total 548 74
parsup PARTEK SUPPLY INC 548 74
PARTEK SUPPLY INC 548 74
Pete Boyer Construction
petboy Pete Boyer Construction
Ck 134357 09 27 07
Iny 200603103
Line Item Date
09 25 07
Iny 200603103
Line Item Description
Erosion escrow 2300 Melody Hill Rd
Total
Line Item Account
815 8202 2024 500 00
500 00
Ck 134357 Total 500 00
petboy Pete Boyer Construction 500 00
Pete Boyer Construction 500 00
PETERS MATT
petematt PETERS MATT
Ck 134358 09 27 07
Iny 092407
Line Item Date
09 24 07
Iny 092407 Total
Line Item Description
Reimburse Firefighter class expenses
Line Item Account
101 1220 4370 250 38
250 38
Ck 134358 Total 250 38
petematt PETERS MATT 250 38
PETERS MATT 250 38
Page 25
443
CITY OF CHANHAS
User danielIe
Pony Pals
ponpal Pony Pals
Ck 134359 09 27 07
Iny 092807
Line Item Date
09 26 07
Iny 092807 Total
Ck 134359 Total
ponpal
Pony Pals
Line Item Description
Barnyard Boogey petting zoo
Pony Pals
PRAIRIE RESTORATIONS INC
prares PRAIRIE RESTORATIONS INC
Ck 134300 09 20 07
Iny 109507
Line Item Date
0912 07
Iny 109507 Total
Ck 134300 Total
prares
Line Item Description
Lk Susan restoration
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I 1 41
Amount
Line Item Account
101 1711 4300 265 00
265 00
265 00
265 00
265 00
Line Item Account
720 7202 4300 13349
13349
13349
PRAIRIE RESTORATIONS INC
PRAIRIE RESTORATIONS INC 133 49
PRO TURF
PRTURF PRO TURF
Ck 134361 09 27 07
Iny 199592
Line Item Date
0915 07
Iny 199592 Total
Iny 199749
Line Item Date
0918 07
Iny 199749 Total
Iny 199750
Line Item Date
0915 07
Iny 199750 Total
Ck 134361 Total
PRTURF
PRO TURF
Promotion Select
prosel Promotion Select
Ck 134360 09 27 07
Jny 13707
Line Item Date
09 20 07
Line Item Description
Fertilizing
Line Item Description
Fertilizing Chan Library
Line Item Description
Fertilizing Chan West
PRO TURF
Line Item Description
Magnets for Fire Preyention
133 49
Line Item Account
101 1550 4300 1 064 37
1 064 37
Line Item Account
101 1550 4300 145 00
145 00
Line Item Account
101 1550 4300 102 38
102 38
1 311 75
1 311 75
1 311 75
Line Item Account
101 1220 4375 399 53
Page 26
444
CITY OF CHANHAS
User danielIe
Inv 13707 Total
Ck 134360 Total
prosel Promotion Select
Promotion Select
PUMP AND METER SERVICES INC
pummet PUMP AND METER SERVICES INC
Ck 134362 09 27 07
Inv 253210
Line Item Date Line Item Description
0913 07 Drain valve kit
Inv 253210 Total
Ck 134362 Total
Accounts Payable
Check Detail Report Detail
Printed 0928 07 II 41
Amount
399 53
399 53
399 53
399 53
Line Item Account
101 1370 4150 109 30
109 30
109 30
PUMP AND METER SERVICES INC
109 30
pummet
PUMP AND METER SERVICES INC
QWEST
qwest QWEST
Ck 134301
Inv 090107
Line Item Date
09 0107
09 0 I 07
Inv 090107 Total
09 20 07
Line Item Description
Telephone charges
Telephone charges
Ck 134301 Total
qwest QWEST
QWEST
Reed Katie
ReedKati Reed Katie
Ck 134363 09 27 07
Inv 092107
Line Item Date
0915 07
Inv 092107 Total
Line Item Description
Mileage reimbursement
Ck 134363 Total
ReedKati Reed Katie
Reed Katie
Robb Teri
robbteri Robb Teri
Ck 134302 09 20 07
Inv 2000791 002
Line Item Date Line Item Description
09 17 07 Refund dance
109 30
Line Item Account
700 0000 4310
701 0000 4310
34 21
34 21
6842
6842
68 42
6842
Line Item Account
101 1130 4370 138 71
138 71
138 71
138 71
138 71
Line Item Account
101 1534 3631 95 00
Page 27
445
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I 1 41
InY 2000791 002 Total
Amount
95 00
Ck 134302 Total 95 00
robbteri Robb Teri 95 00
Robb Teri 95 00
Ryland Homes
rylhom Ryland Homes
Ck 134364 09 27 07
Iny 14 I 9beth
Line Item Date Line Item Description
09 26 07 Erosion escrow 1419 Bethesda Cir
Iny 1419beth Total
Line Item Account
815 8202 2024 500 00
500 00
Ck 134364 Total 500 00
rylhom Ryland Homes 500 00
Ryland Homes 500 00
Sales Guides
salgui Sales Guides
Ck 134303 09 20 07
InY 470570
Line Item Date
091 0 07
InY 470570 Total
Line Item Description
Calendars
Line Item Account
101 1220 4375 367 60
367 60
Ck 134303 Total 367 60
salgui Sales Guides 367 60
Sales Guides 367 60
Schwickert Company
Schcom Schwickert Company
Ck 134365 09 27 07
Iny 200702265
Line Item Date Line Item Description
09 20 07 Refund 1200 W 78th Street
Iny 200702265 Total
Line Item Account
101 1250 4901 103 75
103 75
Ck 134365 Total 103 75
Schcom Schwickert Company 103 75
Schwickert Company 103 75
SEH
seh SEH
Ck 134304
Iny 165373
Line Item Date
08 10 07
Iny 165373 Total
09 20 07
Line Item Description
Comprehensiye water plan
Line Item Account
101 1421 4300 2 871 93
2 871 93
Page 28
446
CITY OF CHANHAS
User danieIle
Iny 166081
Line Item Date
0815 07
Iny 166081 Total
InY 166144
Line Item Date
0816 07
Iny 166144 Total
Ck 134304 Total
seh
SEH
Line Item Description
STP application Hwy 101
Line Item Description
East water treatment plant
SEH
SENTRY SYSTEMS INC
sensys SENTRY SYSTEMS INC
Ck 134305 09 20 07
InY 547412
Line Item Date
09 18 07
09 18 07
Iny 547412 Total
Iny 547484
Line Item Date
09 13 07
Iny 547484 Total
Ck 134305 Total
sensys
SENTRY SYSTEMS INC
Line Item Description
Public works monitoring
Public works monitoring
Line Item Description
Fire station monitoring alarm test
SENTRY SYSTEMS INC
SHERWIN WILLIAMS
shewiI SHERWIN WILLIAMS
Ck 134306 09 20 07
InY 6164 0
Line Item Date Line Item Description
09 10 07 Paint
Iny 6164 0 Total
Ck 134306 Total
shewiI
SHERWIN WILLIAMS
SHERWIN WILLIAMS
SM HENTGES SONS
smhen SM HENTGES SONS
Ck 134366 09 27 07
Iny 091707
Line Item Date Line Item Description
09 17 07 Koehnen area reconstruction
Iny 091707 Total
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I 1 41
Amount
Line Item Account
4 15 4006 4300 3 500 00
3 500 00
Line Item Account
700 7014 4752 2 98450
2 98450
9 35643
9 356 43
9 35643
Line Item Account
101 1190 4300
101 1370 4300
5172
93 01
144 73
Line Item Account
101 1220 4300 157 92
157 92
302 65
302 65
302 65
Line Item Account
101 1170 4510 43 35
43 35
43 35
43 35
43 35
Line Item Account
601 60 16 4751 839 583 66
839 583 66
Page 29
447
CITY OF CHANHAS
User danielle
Ck 134366 Total
srnhen
SM HENTGES SONS
SM HENTGES SONS
Accounts Payable
Check Detail Report Detail
SOUTH METRO PUBLIC SAFETY TRAINING FACILITY
sou met SOUTH METRO PUBLIC SAFETY TRA
Ck 134307 09 20107
Iny 7048
Line Item Date
08 2 I07
Iny 7048 Total
Ck 134307 Total
sou met
Line Item Description
Fire building rental
SOUTH METRO PUBLIC SAFETY TRA
SOUTH METRO PUBLIC SAFETY TRAINING FACILITY
STAR TRIBUNE
statri STAR TRIBUNE
Ck 134308 09 20107
Iny 538663
Line Item Date
0919 07
Iny 538663 Total
Ck 134308 Total
statri
STAR TRIBUNE
Line Item Description
Subscription renewal
STAR TRIBUNE
STEPP MANUFACTURING
sternan STEPP MANUFACTURING
Ck 134367 09 27 07
InY 35588
Line Item Date
0912107
Iny 35588 Total
Ck 134367 Total
sternan
Line Item Description
Heating element
STEPP MANUFACTURING
STEPP MANUFACTURING
STICHA GREG
sticgreg STICHA GREG
Ck 134368 09 27 07
InY 092107
Line Item Date
09 26 07
Iny 092107 Total
Ck 134368 Total
Line Item Description
Mileage reimbursement
Printed 09 28 07 I 1 4 I
Amount
839 583 66
839 583 66
839 583 66
Line Item Account
101 1220 4370 510 00
510 00
510 00
510 00
510 00
Line Item Account
101 1530 4360 3250
3250
32 50
32 50
32 50
Line Item Account
101 1320 4120 361 22
361 22
361 22
361 22
361 22
Line Item Account
101 1130 4370 14648
14648
14648
Page 30
448
CITY OF CHANHAS
User danielle
sticgreg STICHA GREG
STICHA GREG
TAN Construction LLC
tancon TAN Construction LLC
Ck 134369 09 27 07
InY 200501427
Line Item Date Line Item Description
09 25 07 Erosion escrow 970 I Flintlock
InY 200501427 Total
Ck 134369 Total
tancon TAN Construction LLC
TAN Construction LLC
TARGET
target TARGET
Ck 134370 09 27 07
InY 9117
Line Item Date
08 20 07
Iny 9117 Total
Line Item Description
cleaning supply
Ck 134370 Total
target TARGET
TARGET
TECHNAGRAPHICS
tecgra TECHNAGRAPHICS
Ck 134371 09 27 07
InY 5316011
Line Item Date Line Item Description
0914 07 Business cards
Iny 53 I 60II Total
Ck 134371 Total
tecgra TECHNAGRAPHICS
TECHNAGRAPHICS
TERMINIX
termin TERMINIX
Ck 134309 09 20 07
Iny 271503333
Line Item Date Line Item Description
09 03 07 Pest control
InY 271503333 Total
Ck 134309 Total
termin TERMINIX
Accounts Payable
Check Detail Report Detail
Printed 0928 07 II 41
Amount
146 48
146 48
Line Item Account
815 8202 2024 500 00
500 00
500 00
500 00
500 00
Line Item Account
101 1170 4110 19 13
19 13
19 13
19 13
19 13
Line Item Account
101 1170 4110 176 02
176 02
176 02
176 02
176 02
Line Item Account
101 1220 4300 47 93
47 93
47 93
47 93
Page 31
449
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I 1 41
TERMINIX
Amount
47 93
TOLL GAS WELDING SUPPLY
tolgas TOLL GAS WELDING SUPPLY
Ck 134310 09 20 07
Iny 184849
Line Item Date
09 05 07
Iny 184849 Total
Line Item Description
Headgear
Line Item Account
101 1550 4120 9 87
9 87
Ck 134310 Total 9 87
tolgas TOLL GAS WELDING SUPPLY 9 87
TOLL GAS WELDING SUPPLY 9 87
TOP NOTCH TREECARE
topnot TOP NOTCH TREECARE
Ck 134311 09 20 07
Iny X034223 01
Line Item Date
0711 07
Iny X034223 01
Line Item Description
Tree spraying
Total
Line Item Account
101 1550 4300 99045
99045
Ck 134311 Total 99045
topnot TOP NOTCH TREECARE 99045
TOP NOTCH TREE CARE 99045
TOWN AND COUNTRY HOMES
UB 00093 TOWN AND COUNTRY HOMES
Ck 134376 09 27 07
Iny
Line Item Date
09 26 07
09 26 07
09 26 07
09 26 07
Iny Total
Line Item Description
Refund check
Refund check
Refund check
Refund check
Line Item Account
700 0000 2020
720 0000 2020
700 0000 2020
701 0000 2020
1 65
2 53
3 64
6 93
14 75
Ck 134376 Total 14 75
UB 00093 TOWN AND COUNTRY HOMES 14 75
UB 00094 TOWN AND COUNTRY HOMES
Ck 134377 09 27 07
Iny
Line Item Date Line Item Description
09 26 07 Refund check
Iny Total
Line Item Account
700 0000 2020 699 71
699 71
Ck 134377 Total 699 71
UB 00094 TOWN AND COUNTRY HOMES 699 71
Page 32
450
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I 1 41
Amount
UB 00095 TOWN AND COUNTRY HOMES
Ck 134378 09 27 07
Iny
Line Item Date
09 26 07
09 26 07
09 26 07
09 26 07
Iny Total
Line Item Description
Refund check
Refund check
Refund check
Refund check
Line Item Account
720 0000 2020
700 0000 2020
700 0000 2020
701 0000 2020
0 76
0 96
3 95
7 50
13 17
Ck 134378 Total 13 17
UB 00095 TOWN AND COUNTRY HOMES 13 17
TOWN AND COUNTRY HOMES 727 63
TRl DIM FILTER CORP
tridim TRI DIM FILTER CORP
Ck 134372 09 27 07
Iny 699176 3
Line Item Date Line Item Description
09 13 07 Trijet 2 ply
InY 699176 3 Total
Iny 699176 4
Line Item Date Line Item Description
09113 07 Tri jet 2 ply
Iny 699176 4 Total
Line Item Account
101 1170 4510 53 74
53 74
Line Item Account
101 1170 4510 18 16
18 16
Line Item Account
101 1220 4510 16 76
16 76
Line Item Account
101 1190 4510 15 28
15 28
Line Item Account
101 1170 4510 8 38
8 38
Line Item Account
101 I 370 4510 8 38
8 38
Line Item Account
101 1170 4510 2044
2044
Line Item Account
101 1190 4510 4 240 00
4 240 00
Iny 699176 5
Line Item Date Line Item Description
0911 3 07 Trijet 2 ply
Iny 699176 5 Total
Iny 699176 6
Line Item Date Line Item Description
09113 07 Tri Jet 2 ply
Iny 699176 6 Total
InY 699176 7
Line Item Date Line Item Description
09 13 07 Trijet 2 ply
Iny 699176 7 Total
Iny 699176 8
Line Item Date Line Item Description
09 13 07 Trijet 2 ply
Iny 699176 8 Total
Iny 699176 9
Line Item Date Line Item Description
0911 3 07 Trijet 2 ply
Iny 699176 9 Total
InY 702976 1
Line Item Date Line Item Description
09 11107 HV AC intake
Iny 702976 1 Total
Page 33
451
CITY OF CHANHAS
User danieJle
Inv 702976 2
Line Item Date Line Item Description
09 1 1 07 HV AC intake
Inv 702976 2 Total
Ck 134372 Total
tridim TRI DIM FILTER CORP
TRI DIM FILTER CORP
TWIN CITY SEED CO
twisee TWIN CITY SEED CO
Ck 134312 09 20 07
Inv 17650
Line Item Date Line Item Description
09 12 07 Athletic turf mixture
Inv 17650 Total
Ck 134312 Total
twisee TWIN CITY SEED CO
TWIN CITY SEED CO
UNITED WAY
UNIWA Y UNITED WAY
Ck 134379 09 27 07
Inv
Line Item Date
09 24 07
Inv Total
Line Item Description
PR Batch 428 9 2007 United Way
Ck 134379 Total
UNIWA Y UNITED WAY
UNITED WAY
US TOY CO
ustoy US TOY CO
Ck 134380 09 27 07
Inv 419230
Line Item Date Line Item Description
09 2107 Shark tooth necklaces
Inv 419230 Total
Ck 134380 Total
ustoy US TOY CO
US TOY CO
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I 1 41
Amount
Line Item Account
101 1220 4510 683 00
683 00
5 064 14
5 064 14
5 064 14
Line Item Account
101 1550 4150 372 75
372 75
372 75
372 75
372 75
Line Item Account
101 0000 2006 42 00
42 00
42 00
42 00
42 00
Line Item Account
101 1220 4375 113 28
113 28
113 28
113 28
113 28
Page 34
452
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 I 1 41
Amount
VERIZON WIRELESS
verizo VERIZON WIRELESS
Ck 134313 09 20 07
Inv 1753364660
Line Item Date Line Item Description
09 03 07 Telephone charges
Inv 1753364660 Total
Line Item Account
101 1220 4310 27 95
27 95
Ck 134313 Total 27 95
Ck 134381 09 27 07
Inv 1756465975
Line Item Date Line Item Description
091 0 07 Telephone charges
Inv 1756465975 Total
Line Item Account
101 1420 4310 6 14
6 14
Ck 134381 Total 6 14
verizo VERIZON WIRELESS 34 09
VERIZON WIRELESS 3409
WASHBURN DANIELLE
washdani WASHBURN DANIELLE
Ck 134382 09 27 07
Inv 082407
Line Item Date
08 24 07
Inv 082407 Total
Line Item Description
Mileage reimbursement
Line Item Account
101 1130 4370 9118
91 18
Ck 134382 Total 9118
washdani WASHBURN DANIELLE 91 18
WASHBURN DANIELLE 91 18
WENCK ASSOCIATES INC
wenck WENCK ASSOCIATES INC
Ck 134314 09 20 07
Inv 702932
Line Item Date
08 3107
Inv 702932 Total
Line Item Description
Lk Susan shoreline repair
Line Item Account
720 0000 4300 2 020 88
2 020 88
Ck 134314 Total 2 020 88
wenck WENCK ASSOCIATES INC 2 020 88
WENCK ASSOCIATES INC 2 020 88
WS DARLEY CO
wsdar WS DARLEY CO
Ck 134383 09 27 07
Inv 764134
Line Item Date
09 17 07
Inv 764134 Total
Line Item Description
Flashlights
Line Item Account
101 1220 4260 470 54
470 54
Page 35
453
CITY OF CHANHAS
User danieIle
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Ck 134383 Total
Amount
47054
wsdar WS DARLEY CO 470 54
WS DARLEY CO 470 54
WSB ASSOCIATES INC
wsb WSB ASSOCIATES INC
Ck 134315 09 20 07
Inv 6
Line Item Date
08 27 07
Inv 6 Total
Line Item Description
Sanitary rehabilitaiton const services
Line Item Account
701 7013 4752 4 807 00
4 807 00
Inv 7
Line Item Date
08 21 07
08 21 07
Inv 7 Total
Line Item Description
Comprehensive sanitary sewer plan
Lift Station 3
Line Item Account
101 1421 4300
701 7015 4752
4 198 75
9 14942
13 348 17
Ck 134315 Total 18 155 17
wsb WSB ASSOCIATES INC 18 155 17
WSB ASSOCIATES INC 18 155 17
XCEL ENERGY INC
xcel XCEL ENERGY INC
Ck 134316 09 20 07
Inv 124699172
Line Item Date Line Item Description
09 08 07 Electricity charges
Inv 124699172 Total
Line Item Account
101 1550 4320 244 65
244 65
Inv 124705219
Line Item Date Line Item Description
08 07 07 Electricity charges
Inv 124705219 Total
Line Item Account
700 0000 4320 1 965 96
1 965 96
Inv 124738788
Line Item Date Line Item Description
09 09 07 Electricity charges
Inv 124738788 Total
Line Item Account
101 1350 4320 2343
2343
Inv 124996962
Line Item Date Line Item Description
08 09 07 Electricity charges
Inv 124996962 Total
Line Item Account
701 0000 4320 25 94
25 94
Ck 134316 Total 2 259 98
Ck 134384 09 27 07
Inv 125569014
Line Item Date Line Item Description
09 17 07 electricity charges
Inv 125569014 Total
Line Item Account
101 1551 4320 97 84
97 84
Page 36
454
CITY OF CHANHAS
User danielle
Inv 125682626
Line Item Date Line Item Description
09 18 07 Electricity charges
Inv 125682626 Total
Inv 125697245
Line Item Date
0918 07
Inv 125697245
Line Item Description
Electricity charges
Total
Inv 125707206
Line Item Date Line Item Description
09 18 07 Electricity charges
Inv 125707206 Total
Inv 125707596
Line Item Date Line Item Description
09118 07 Electricty charges
0918 07 Electricty charges
0918 07 Electricty charges
Inv 125707596 Total
Inv 125721083
Line Item Date Line Item Description
09 18 07 Electricity charges
Inv 125721083 Total
Ck 134384 Total
xcel XCEL ENERGY INC
XCEL ENERGY INC
Total
Accounts Payable
Check Detail Report Detail
Printed 09 28 07 11 41
Amount
Line Item Account
701 0000 4320 2 844 23
2 844 23
Line Item Account
101 1540 4320 963 74
963 74
Line Item Account
101 1220 4320 9411 0
9411 0
Line Item Account
700 0000 4320 65 99
701 0000 4320 66 00
101 1370 4320 527 96
659 95
Line Item Account
700 0000 4320 11 756 78
11 756 78
17 263 64
19 523 62
19 523 62
1 194 448 89
Page 37
455
1 1 @
U S BANK
PO BOX 6343
FARGO ND 58125 6343 1R17
2
RECEIVED
SEP 2 0 Z007
ACCOUNT NUMBER
STATEMENT DATE
NT DUE
NEW ALANCE
PAYMENT DUE ON RECEIPT
09 17 2007
13 977 93
13 97793
p
CITY OF CHANHAs Ul OF CHANHASSEN
ATTN BETTY EIDAM
7700 MARKET BLVD
PO BOX 147
CHANHASSEN MN 55317 0147
I AMOUNT ENCLOSED
Please make check payable to
U S BANK
1 111 1 11 1111111 111 1 1 1111 11 1111 1111 1 11111 11 1 1
U S BANK
P O BOX 790428
ST LOUIS MO 63179 0428
i
I
i
I
Please lear paymenl coupon al perforation I
4485594555516093 001397793 001397793
Cash
Advances
Late
Payment
Charges Credits Payments
CITY OF CHA N
Post Tran
Date Date Reference Number
TOTAL CORPORATE ACTIVITY
19 264 72CR
Transaction Description Amount
09 04 09 04 74798267247000000000181 PAYMENT THANK YOU 00000 W 19 264 72 PY
KATHRYN AANENSON
I
CREDITS
000
PURCHASES
1 129 00
CASH ADV
0 00
TOTAL ACTIVITY
1 129 00
Post Tran
Date Date Reference Number Transaction Descri tion Amount
08 28 08 27 24492157240849628617485
09 14 09 13 24266577256207287800096
09 14 09 13 24266577256207287800112
09 17 09 14 24266577257207287900754
PAYPAL MNAPA402 935 7733CA 1 1 1I D 4370 230 00
APA ON LINE MEMBERSHIPS 312 431 9100 IL 180 00
APA ON LINE MEMBERSHIPS 312 431 9100 ILLJ LIJ D 3 D 474 00
APA ON UNE MEMBERSHIPS 312431 9100 IL t 245 00
CUSTOMER SERVICE CALL ACCOUNT NUMBER ACCOUNT SUMMARY
PREVIOUS BALANCE 19264 72
1 800 344 5696 OTHERC H ARt ES 14133 11
STATEMENT DATE DISPUTED AMOUNT CASH ADVANCES 00
09 17 07 00 CASH ADVANCE FEES 00
GESv 1
00
SEND BILLING INQUIRIES TO AMOUNT DUE CREDITS 155 18
PAYMENTS 19264 72
U S BANK 13 977 93POBox6344
Fargo ND 58125 6344 ACCOUNT BALANCE 13 977 93
Page 1 of 7456
l
y
Comoanv Name CITY OF CHANHASSEN
Comorate Account Number
Statement Date 09 17 2007
SUSAN BILL
Post Tran
Date Date Reference Number
CREDITS
0 00
PURCHASES
20 26
CASH ADV
0 00
09 12 09 11 24455017254140005533758 WAL MART 1855 EDEN PRAIRIE MN
Transaction Descri tion
JERRY CtU LUPSKY
Post Tran
Date Date Reference Number
CREDITS
0 00
PURCHASES
173 90
CASH ADV
0 00
TOTAL ACTIVITY
20 26
D 5 lPO LJ 30D
TOTAL ACTIVITY
173 90
Amount
20 26
09 0609 05 24717057249692490229969 CABELAS COM 92450338 800 2374444 NE IO 550 4dAt O 173 90
Amount
EDWARD J COPPERSMITH
Post Tran
Date Date Reference Number
Transaction Descri tion
CREDITS
0 00
PURCHASES
215 70
CASH ADV
0 00
Transaction Descri tion
08 21 08 20 24692167232000995962263
08 27 08 24 24164077236091007672277
08 31 08 30 24164077242091007604769
KEVIN CROOKS
Post Tran
Date Date
08 30 08 28
08 31 08 30
08 31 08 30
09 03 08 30
09 10 09 06
Reference Number
24610437241010179485671
24717057242152420438187
24717057242152420438195
24610437243010178469096
24610437250010179223153
fHARLES A EILE
Post Tran
Date Date Reference Number
TOTAL ACTIVITY
215 70
ODI OUR DESIGNS 800 382 5252 KY 10 1 JdO LJ375TARGET00008623CHANHASSENMNIOOICjO
TARGET 00008623 CHANHASSEN MN 10 1 O y qO
CREDITS
0 00
PURCHASES
1 233 37
CASH ADV
0 00
TOTAL ACTIVITY
1 233 37
TOTAL ACTIVITY
68 07
Amount
37 95
92 62
85 13
Amount
85 19
204 38
305 64
476 33
161 83
09 12 09 10 24610437254010178311047 THE HOME DEPOT 2825 CHESKA MN 10 J S5D LIS f 68 07
Amount
Transaction Descri tion
THE HOME DEPOT 2812 EDEN PRAIRIE MN
SEELYE PLASTICS MN 612 8812658 MN
SEELYE PLASTICS MN 612 8812658 MN
THE HOME DEPOT 2812 EDEN PRAIRIE MN
THE HOME DEPOT 2812 EDEN PRAIRIE MN
CREDITS
0 00
PURCHASES
68 07
CASH ADV
0 00
TODD GERHARDT
Transaction Description
CREDITS
0 00
PURCHASES
27841
CASH ADV
0 00
TOTAL ACTIVITY
27841
Page 2 of 7
457
Company Name CITY OF CHANHASSEN
Comorate Account Number
Statement Date 09 17 2007
Post Tran i
Date Date Reference Number Transaction Descri tion Amount
09 12 09 10 24717057254582543743367 NWA AIR 0122154050261 800 2252525 MN 0 I I O LI37D 27841
GERHARDT TOO 10 06 07
MSP NW K PIT NW K MSP
GREGG GESKE
Post Tran
Date Date Reference Number
CREDITS
000
CASH ADV
0 00
TOTAL ACTIVITY
12 73
PURCHASES
12 73
Transaction Descri tion Amount
09 10 09 08 24055237251200035800162 CHANHASSEN CAR WASH 109529060654 MN IV I I O L 5J D 12 73
DALE GREGORY
Post Tran
Date Date Reference Number
08 23 08 22 24692167234000217610417
08 31 08 30 24765017242010000511259
09 10 09 07 24632697251251207733308
09 13 09 12 24164077255091007864391
COREY GRUEE
Post Tran
Date Date Reference Number
08 16 08 15
08 17 08 16
08 22 08 21
08 30 08 29
09 04 09 03
0917 09 14
24692167227000579564102
24418007228228007115201
24445007233940651134102
24445007241950486800603
24445007246956901599675
24445007257970408563429
LAURIE A HOKKAf1
Post Tran
Date Date Reference Number
08 24 08 23 24755427236122367823812
08 29 08 27 24164077240755242218005
09 10 09 06 24717057250582509535546
09 12 09 10 24164077254490513392163
CREDITS
0 00
CASH ADV
0 00
TOTAL ACTIVITY
87378
PURCHASES
873 78
Transaction Descri tion Amount
NORTHERN TOOL EQUIPMNT MINNETONKA MN VI I SU l lO 25 53
DIAPER DECK COMPANY 952 985 0666 MN 215 00
FOSTER BROS MARINE 763 9723199 MN 10 550 130 533 25
TARGET 00008623 CHANHASSEN MN 10 550 0 0 100 00
CREDITS
0 00
CASH ADV
0 00
TOTAL ACTIVITY
822 91
PURCHASES
822 91
Transaction Descr lion
WWW NEWEGG COM 800 390 1119 CA IC I II40 L JJ D
TOSHIBA 800 8674422 CA 101 110 LJ 5 0
COW GOVERNMENT 800 8004239 IL 101 1 0 4530
COW GOVERNMENT 800 800 4239 IL 0 070 1110
COW GOVERNMENT 800 8004239 IL 101 1 0 3 00
COW GOVERNMENT 800 8004239 IL 101 D 153D
Amount
31 98
129 90
127 77
166 15
22848
138 63
CREDITS
0 00
CASH ADV
0 00
TOTAL ACTIVITY
639 90
PURCHASES
639 90
Transaction Descri tion
NACELlNK COM 800 5445272 PA J I D Y3LID
HOULlHANS 00111021 CHANHASSEN MN 10 1 0 J 70
K EN 1f153894149 800 2 50 0 DI II W I O
MSP NW K PHL NW T MSP
APPLEBEE S CHA00161257 CHANHASSEN MN ol llfO l 370
Amount
125 00
130 87
283 61
10042
Page 3 of 7
458
Company Name CITY OF CHANHASSEN
Corporate Account Number
Statement Date 09 17 2007
B B IT 1
LEY JANES CREDITS PURCHASES CASH ADV TOTAL ACTIVITY
0 00 493 38 0 00 493 38
Post Tran
Date Date Reference Number Transaction Descriotion Amount
08 23 08 22 24493987235187000019202 MINNESOTA SECTION 6122476731 MN 195 000827082424761977236512107010041AMERWATERWORKSLB3037947711CO6500
08 28 08 24 24492807239118000168753 WATER ENVIRONMENT FEDTN 703 6842400 VA 152 000917091324445007257970408563593OFFICEMAXCHANHASSENMN6380917091324761977258138018496005AMERWATERWORKWEB3033476197CO7500
JERRY JOHNSO CREDITS PURCHASES CASH ADV TOTAL ACTIVITY
0 00 326 91 0 00 326 91
Post Tran
Date Date Reference Number Transaction Descriotion Amount
TARGET 00008623 CHANHASSEN MN 70 Ld40823082224164077234091007660720 38 970824082224326847235333222341292USABLUEBOOK8004939876IL101LS278460906090524332397248000140822546VIKINGELECTRICPLYMOUTHPLYMOUTHMN04SI948
laM KNOWLES CREDITS PURCHASES CASH ADV TOTAL ACTIVITY
0 00 3 178 23 0 00 3 178 23
Post Tran
Date Date Reference Number Transaction Descriotion Amount
08 24 08 23 24164077235091007665769 TARGET 00008623CHANHASSEN MN J tS D l OD 6 380906090424013397248014456261930THEFAIRINC6123790110MN01S5301759500907090624399007249295110670438BESTBUYMHT00006114EDENPRAIRIEMNIOtt1o29850910090724013397251014556745786THEFAIRINC6123790110MNIO53SYJ3D138250
KAREN M LARSON CREDITS PURCHASES CASH ADV TOTAL ACTIVITY
0 00 48 91 0 00 48 91
Post Tran
Date Date Reference Number Transaction Descriotion Amount
08 17 08 15 24445007228934731058859 OFFICE MAX CHANHASSEN MN 0 I I IO i 0 20 210820081724445007230937164224852OFFICEMAXCHANHASSENMN2870
CREDITS PURCHASES CASH ADV TOTAL ACTIVITY
0 00 339 85 0 00 339 85
Post Tran
Date Date Reference Number Transaction Descriotion Amount
08 30 08 28 24610437241010179525617 THE HOME DEPOT 2825 CHESKA MN 211 95
09 10 09 06 24610437250010179254885 THE HOME DEPOT 2825 CHESKA MN 127 90
Page 4 of 7
459
I
Com an Name CITY OF CHANHASSEN
Cor orate Account Number
Statement Date 09 17 2007
KIM MEUWISSEN CREDITS
0 00
PURCHASES
105 91
CASH ADV
0 00
TOTAL ACTIVITY
105 91
Post Tran
Date Date Reference Number Transaction Descri tion Amount
OHJ70 4JO gS 1
TARGET 00008623 CHANHASSEN MN 0 170 LillO dp 7 05 910824082324164077235091007665926
JERRITT W MOHN CREDITS
0 00
PURCHASES
70 00
CASH ADV
0 00
TOTAL ACTIVITY
70 00
Post Tran
Date Date Reference Number Transaction Descri tion Amount
08 29 08 27 24323037240138012200945 INT L CODE COUNCIL INC 708 799 2300 IL OJ 1 5D I 0 70 00
TIM MONNENS CREDITS
0 00
PURCHASES
176 89
CASH ADV
0 00
TOTAL ACTIVITY
176 89
Post Tran
Date Date Reference Number Transaction Descri tion
08 27 08 23 24717057236692362592291 MILLS FLEET FARM 25 LAKEVILLE MN
Amount
176 89
BRAD MORSE CREDITS
0 00
PURCHASES
31 90
CASH ADV
0 00
TOTAL ACTIVITY
31 90
Post Tran
Date Date Reference Number Transaction Descri tion Amount
08 20 08 16 24610437229010179389176 THE HOME DEPOT 2825 CHESKA MN 10 1 55D l ISO 31 90
VE H NINOW CREDITS
0 00
PURCHASES
68 70
CASH ADV
0 00
TOTAL ACTIVITY
68 70
Post Tran
Date Date Reference Number Transaction Descri tion Amount
08 27 08 23 24717057236692362592309 MILLS FLEET FARM 25 LAKEVILLE MN
09 12 09 11 24164077254091006887311 TARGET 00008623 CHANHASSEN MN
52 99
15 71
RICHARD D RICE CREDITS
0 00
PURCHASES
1 101 10
CASH ADV
0 00
TOTAL ACTIVITY
1 101 10
Post Tran
Date Date Reference Number Transaction Descri tion
ALLSTAR WIRELESS 9528080060 MN 101 II p0 45 D
COW GOVERNMENT 800 8004239 IL IO IIO 1530
TARGET 00008623 CHANHASSEN MN lOI I PO L1010
Amount
08 20 08 17
09 13 09 12
09 14 09 13
24323007230542870010038
24445007255967962281101
24164077256091007295520
133 08
918 02
50 00
Page 5 of 7
460
i
JERRY RUEGEMER
Post Tran
Date Date
08 20 08 18
08 30 08 28
09 10 09 07
Comoany Name CITY OF CHANHASSEN
Comorate Account Number
Statement Date 09 17 2007
Reference Number
24427337230720005125121
24127447241241144229002
24164077250091008083038
Post Tran
Date Date
08 17 08 16
08 22 08 21
08 22 08 21
JILL SINCLAIR
Post Tran
Date Date
09 12 09 11
Reference Number
24717057229122294789962
74761977233206788400047
24717057234122344425370
Reference Number
ROGER SMALLBECK
24765017254514000199564
Post Tran
Date Date Reference Number
08 16 08 15 24492157227849453124083082008172416407722909100809358908290827240710572403801543594260829082724164077240255237548821
JOHN W STUTZMAN
Post Tran
Date Date Reference Number
08 17 08 16
0903 08 31
09 03 08 31
09 07 09 06
09 07 09 06
09 07 09 04
09 13 09 12
09 17 09 14
24717057228732288935453
2416407724309100688137524692167243000010151634
24164077249091011347960
24164077249091011347978
2435178724913240182520224761977255070255943386
74351787259134264594299
CREDITS
0 00
PURCHASES
113 85
CASH ADV
000
TOTAL ACTIVITY
113 85
AmountTransactionDescrition
O jtLfO LII30 349CUBFOODSCHANHASSENMN4770FRANKIESPIZZAPASTAANDCHANHASSENMNItJD5fTARGET00008623CHANHASSENMN10IIPr
CREDITS
8 54
PURCHASES
12 15
CASH ADV
0 00
TOTAL ACTIVITY
3 61
Transaction Descri tion
LUTHER BROOKDALE CHEVROLE 763 5619220 MN
LDV INC BURLINGTON WI
LUTHER BROOKDALE CHEVROLE 763 5619220 MN
Amount
7 33
8 54CR
4 82
CREDITS
0 00
CASH ADV
000
TOTAL ACTIVITY
15 31
PURCHASES
15 31
AmountTransactionDescrition
LOTUS LAWN AND GARDEN CHANHASSEN MN 7d D 7l o 1 015 31
CREDITS
0 00 PURCHASES
588 91
CASH ADV
0 00
TOTAL ACTIVITY
588 91
Transaction Descri tion Amount
PAYPAL CHRISDAVIDO 402 935 7733 CA 0 O q 7D 22 95TARGET00008623CHANHASSENMN01O4IoO10408PROMODIRECT3107829900CA0LO3
7S 38148SUBWAY00111690CHANHASSENMNIOIPoLt8040
CREDITS
146 64
PURCHASES
1 310 27
CASH ADV
0 00
TOTAL ACTIVITY
1 163 63
Transaction Descri tion Amount
OPTICAL AND PNC CHANHASSE CHANHASSEN MN o t OO 4130 65 00TARGET00008623CHANHASSENMNIOIlll41001207CMIUMNEXTENSION6126254261WA1015031070700TARGET00008623CHANHASSENMN1000Lf3029285TARGET00008623CHANHASSENMN2342SSWORLDWIDE8009373482CT01111173019552FEDEXSHP091007AB614010009719TN1441SSWORLDWIDE8009373482CT14664CR
Page 6 of 7
461
liA Com an Name CITY OF CHANHASSEN
Cor orate Account Number
Statement Date 09 17 2007
MARJORIE A THEIS CREDITS
0 00
PURCHASES
23 95
CASH ADV
0 00
Post Tran
Date Date Reference Number Transaction Descri tion Amount
09 05 09 04 24210737248207866901685 ONLINE LABELS 888 575 2235 FL ID J 1170 110 23 95
RANDY CREDITS
0 00
PURCHASES
1949
CASH ADV
0 00
TOTAL ACTIVITY
1949
Post Tran
Date Date Reference Number Transaction Descri tion Amount
08 29 08 27 24761977240512346014469 PAPA MURPHYS PIZZA MN CHANHASSEN MN ID 1 Y 7D 1949
CORI WALLIS CREDITS
0 00
PURCHASES
639 37
CASH ADV
0 00
TOTAL ACTIVITY
639 37
Post Tran
Date Date Reference Number
08 20 08 16 24445007229935876821422
08 24 08 23 24435657235686316004212
08 24 08 23 24435657235686316004238
Transaction Descri tion Amount
OFFICE MAX CHANHASSEN MN
VWR INTERNATIONAL INC 800 932 5000 PA
VWR INTERNATIONAL INC 800 932 5000 PA
33 09
215 57
390 71
Department 00000 Total
Division 00000 Total
13 977 93
13 977 93
Page 7 of 7462
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
Phone 952 227 1100
Fax 952 227 1110
Building Inspections
Phone 952 227 1180
Fax 952227 1190
Engineering
Phone 952 227 1160
Fax 952 227 1170
Finance
Phone 952 227 1140
Fax 952 227 1110
Park Recreation
Phone 952 227 1120
Fax 952 227 1110
Recreation Center
2310 Coulter Boulevard
Phone 952 227 1400
Fax 952 227 1404
Planning
Natural Resources
Phone 952 227 1130
Fax 952 227 1110
Public Works
1591 Park Road
Phone 952 227 1300
Fax 952 227 1310
Senior Center
Phone 952227 1125
Fax 952 227 1110
Web Site
www ci chanhassen mn us
MEMORANDUM
TO Mayor
City Council
FROM Greg Sticha Finance Director
DATE o4rOctober122007
SUBJECT Review of Claims Paid
The following claims are submitted for review on October 22 2007
Check Numbers Amounts
134385 134527 693 140 52
Total All Claims 693 140 52
Attachments Check Summary
Check Detail Report
The City of Chanhassen A growing community with clean lakes quality schools a charming downtown thriving businesses winding trails and beautiful parks A glBat place to live work and play463
CITY OF CHANHASSEN Accounts Payable Printed 1012 2007 08 46
User danielle Checks by Date Summary by Check Number Summary
Check Number Vendor No Vendor Name Check Date Void Amount Check Amount
134385 BENJWALT WALTER BENJAMIN 1 1 2007 0 00 100 00
134386 post POSTMASTER 1 1 2007 0 00 869 09
134387 AIIBla ALLIED BLACKTOP 10 04 2007 0 00 32 164 87
134388 AItReb ALTERNATOR REBUILD CO 10 04 2007 0 00 307 16
134389 AmeSol AMERICAN SOLUTIONS 10 04 2007 0 00 725 60
134390 AncTec ANCOM TECHNICAL CENTER 10 04 2007 0 00 188 33
134391 ASBENE ASSURANT EMPLOYEE BENEFITS 10 04 2007 0 00 1 18447
134392 BenPro BENIEK PROPERTY SERVICES INC 10 04 2007 0 00 18638
134393 BOYSCO BOY SCOUT TROOP 330 10 04 2007 0 00 98 00
134394 CarTre CARVER COUNTY TREASURER 10 04 2007 0 00 30 75
134395 CatPar CATCO PARTS SERVICE 10 04 2007 0 00 50 14
134396 ChaGoo CHANHASSEN GOODYEAR 10 04 2007 0 00 146 22
134397 CHANHA CITY OF CHANHASSEN 10 04 2007 0 00 82 98
134398 ChaVet CHANHASSEN VETERINARY 10 04 2007 0 00 1 197 31
134399 Choice Choice Inc 10 04 2007 0 00 21755
134400 CorExp CORPORATE EXPRESS 10 04 2007 0 00 95 50
134401 Crabtr CRABTREE COMPANIES INC 10 04 2007 0 00 239 97
134402 CumNor CUMMINS NORTH CENTRAL 10 04 2007 0 00 9174
134403 EngWat Engel Water Testing Inc 10 04 2007 0 00 350 00
134404 FacMot FACTORY MOTOR PARTS COMPANY 10 04 2007 0 00 85 19
134405 FSHCom FSH COMMUNICATIONS LLC 10 04 2007 0 00 127 80
134406 GeneBob BOB GENEROUS 10 042007 0 00 9118
134407 GerhTodd TODD GERHARDT 10 04 2007 0 00 575 00
134408 GopSig GOPHER SIGN COMPANY 10 04 2007 0 00 1 140 10
134409 HDSup HD Supply Waterworks LTD 10 04 2007 0 00 5 371 88
134410 HooThr Hoops Threads 10 04 2007 0 00 18 63
134411 ICC INTERNATIONAL CODE COUNCIL 10 04 2007 0 00 17050
134412 IndSup INDUSTRIAL SUPPLY CO INC 10 04 2007 0 00 12 18
134413 In frat INFRA TECH 10 04 2007 0 00 113 51
134414 JHLar JH LARSON COMPANY 10 04 2007 0 00 386 79
134415 KidPlu Kidd Plumbing Inc 10 04 2007 0 00 209 50
134416 KINDDEBR DEBRA KIND 10 04 2007 0 00 340 00
134417 Larsel Larson Electronics LLC 10 04 2007 0 00 173 00
134418 MetAth METRO ATHLETIC SUPPLY 10 04 2007 0 00 44 57
134419 METC02 METROPOLITAN COUNCIL 10 04 2007 0 00 116 450 37
134420 MooMed MOORE MEDICAL 10 04 2007 0 00 129 00
134421 MVEC MN V ALLEY ELECTRIC COOP 10 04 2007 0 00 3 925 83
134422 NEENAH NEENAH FOUNDRY COMPANY 10 04 2007 0 00 894 60
134423 ParSup PARTEK SUPPLY INC 10 04 2007 0 00 44 73
134424 PraLaw PRAIRIE LAWN GARDEN 10 04 2007 0 00 50 78
134425 ProTur PROFESSIONAL TURF RENOVATION 10 04 2007 0 00 372 75
134426 qualcon Quality Control Integration 10 04 2007 0 00 1 357 88
134427 Quill QUILL CORPORATION 10 04 2007 0 00 371 63
134428 RBMSer RBM SERVICES INC 10 04 2007 0 00 4 747 37
134429 SenMet SENSUS METERING SYSTEM 10 04 2007 0 00 1 200 00
134430 SheWil SHERWIN WILLIAMS 10 04 2007 0 00 14649
134431 SieCor Sienna Corporation 10 04 2007 0 00 20 243 37
134432 SIGNSU SIGNS N SUCH 10 04 2007 0 00 45 00
134433 SRFCon SRF CONSULTING GROUP INC 10 04 2007 0 00 1 302 65
134434 SWWC SWWC Service Cooperatives 10 04 2007 0 00 41 065 50
134435 VERIZO VERIZON WIRELESS 10 04 2007 0 00 8 74
134436 WacFar WACONIA FARM SUPPLY 10 04 2007 0 00 21 190 35
134437 WASMA2 WASTE MANAGEMENT TCWEST 10 04 2007 0 00 945 56
134438 Xcel XCEL ENERGY INC 10 04 2007 0 00 26 777 30
134439 YenPeis Peishan Yen 10 04 2007 0 00 75 00
134440 LittMark MARK LITTFIN 10 08 2007 0 00 338 75
134441 MCMA MN CITY COUNTY MGMT ASSOC 10 08 2007 0 00 80 00
134442 AARP AARP 1011 2007 0 00 170 00
134443 AARP AARP 1011 2007 0 00 130 00
134444 ActFir Action Fire Protection 1011 2007 0 00 12448
134445 AItReb ALTERNATOR REBUILD CO 1011 2007 0 00 712 93
134446 ARAMAR ARAMARK 10 112007 0 00 158 84
Page 1
464
CITY OF CHANHASSEN Accounts Payable Printed 101 2 2007 08 46
User danielle Checks by Date Summary by Check Number Summary
Check Number Vendor No Vendor Name Check Date Void Amount Check Amount
134447 attmob AT T Mobility 101 1 2007 0 00 945
134448 BCATRA BCA TRAINING DEVELOPMENT 10 112007 0 00 45 00
134449 BenPro BENlEK PROPERTY SERVICES INC 101 1 2007 0 00 3 928 80
134450 BerCas BERGERSON CASWELL INC 10 112007 0 00 5 987 50
134451 BolMen BOLTON MENK INC 10 112007 0 00 27 657 00
134452 BorSta BORDER STATES ELECTRIC SUPPLY 101 1 2007 0 00 22112
134453 BoySco BOY SCOUT TROOP 330 101 1 2007 0 00 44 00
134454 BraInt BRAUN INTERTEC CORPORATION 101 1 2007 0 00 2 68550
134455 CamKnu CAMPBELL KNUTSON 101 1 2007 0 00 11 517 11
134456 CanFin CANON FINANCIAL SERVICES INC 101 1 2007 0 00 753 88
134457 CARENV CARVER COUNTY ENVIRONMENTAL 10 11 2007 0 00 88 20
134458 CARSWC CARVER SWCD 101 1 2007 0 00 1 347 50
134459 CarTre CARVER COUNTY TREASURER 10 112007 0 00 22 609 30
134460 CENENE CENTERPOINT ENERGY MINNEGASCO 10 11 2007 0 00 1 261 09
134461 CenTel CENTURY TEL 101 1 2007 0 00 2 58947
134462 ChaCha CHANHASSEN CHAMBER OF COMMERCE 10 11 2007 0 00 20 00
134463 ChaGat CHASKA GATEW A Y PARTNERS 101 1 2007 0 00 3 150 00
134464 COMTRA COMMISSIONER OF TRANSPORTATION 101 1 2007 0 00 277 97
134465 CorExp CORPORATE EXPRESS 101 12007 0 00 203 60
134466 Danka DANKA OFFICE IMAGING COMPANY 101 1 2007 0 00 82238
134467 DeepRock Deep Rock Water Company 10 11 2007 0 00 6 71
134468 DelToo DELEGARD TOOL COMPANY 10 11 2007 0 00 15 34
134469 FacMot FACTORY MOTOR PARTS COMPANY 10 11 2007 0 00 9541
134470 FSHCom FSH COMMUNICATIONS LLC 10 112007 0 00 127 80
134471 GBTec GB Technologies 101 1 2007 0 00 5 02
134472 GenPar GENERAL PARTS INC 10 11 2007 0 00 477 00
134473 GSDir GS DIRECT INC 10 11 2007 0 00 57 35
134474 HamiMich MICHAEL HAMILTON 10 112007 0 00 264 00
134475 HawChe HA WKINS CHEMICAL 10 112007 0 00 7401 95
134476 HoiKoe HOISINGTON KOEGLER GROUP 101 1 2007 0 00 1 845 00
134477 HooThr Hoops Threads 101 1 2007 0 00 1 590 00
134478 ICMART ICMA RETIREMENT AND TRUST 457 10 11 2007 0 00 1 840 00
134479 ImpPor IMPERIAL PORTA PALACE 10 112007 0 00 2 21356
134480 Infrat INFRATECH 10 112007 0 00 178 90
134481 JBeMec J BERD MECHANICAL CONTRACTORS 101 12007 0 00 83 00
134482 KimHor KIMLEY HORN AND ASSOCIATES INC 101 1 2007 0 00 39 868 74
134483 KnowTom Tom Knowles 101 1 2007 0 00 90 88
134484 KreSpr KREMER SPRING ALIGNMENT INC 10 11 2007 0 00 529 00
134485 LabSaf LAB SAFETY SUPPLY 10 11 2007 0 00 343 28
134486 LakCom LAKESHORE COMMUNICATIONS LLC 10 112007 0 00 420 00
134487 LANEQl Lano Equipment 10 11 2007 0 00 220 86
134488 MarcTom TOM MARCSISAK 101 1 2007 0 00 2 816 00
134489 MerAce MERLlNS ACE HARDWARE 101 1 2007 0 00 1 23348
134490 MetFor METROPOLITAN FORD 101 1 2007 0 00 23116
134491 Metroc METROCALL 10 112007 0 00 39 66
134492 MNCHIL MN CHILD SUPPORT PAYMENT CTR 10 112007 0 00 452 23
134493 MnNat MN DEPT OF NATURAL RESOURCES 10 112007 0 00 20 00
134494 MRPA MN RECREATION PARK ASSOC 101 1 2007 0 00 336 00
134495 MSRS MSRS 101 1 2007 0 00 15 076 16
134496 MTlDis MTI DISTRIBUTING INC 101 1 2007 0 00 438 79
134497 Napa NAPA AUTO TRUCK PARTS 10 11 2007 0 00 11 09
134498 NatBag NATIONAL BAG 10 11 2007 0 00 154 54
134499 NA TRET NATIONWIDE RETIREMENT SOLUTION 10 11 2007 0 00 5 677 09
134500 NATRET NATIONWIDE RETIREMENT SOLUTION 10 11 2007 0 00 2 932 58
134501 NCPERS MN NCPERS LIFE INSURANCE 10 112007 0 00 16 00
134502 Nextel NEXTEL 10 11 2007 0 00 2 534 16
134503 OehmPaul PAUL OEHME 101 1 2007 0 00 5 82
134504 ParCon PARROTT CONTRACTING INC 101 1 2007 0 00 6 400 00
134505 PoitPaul Paul Judy Poitevent 10 11 2007 0 00 500 00
134506 PraRes PRAIRIE RESTORATIONS INC 10 112007 0 00 3 167 78
134507 Quill QUILL CORPORATION 101 1 2007 0 00 407 32
134508 RyaCon Ryan Contracting Company 101 1 2007 0 00 103 236 03
Page 2
465
CITY OF CHANHASSEN Accounts Payable Printed 10 12 2007 08 46
User danielle Checks by Date Summary by Check Number Summary
Check Number Vendor No Vendor Name Check Date Void Amount Check Amount
134509 SEH SEH 10 112007 0 00 154 60
134510 ShoTru SHOREWOOD TRUE VALUE 10 112007 0 00 46 11
134511 Signso SIGNSOURCE 1011 2007 0 00 348 82
134512 SMHen SM HENTGES SONS 1011 2007 0 00 69 717 02
134513 StaOne Stratum One Fitness Inc 1011 2007 0 00 1 395 00
134514 Streic STREICHER S 1011 2007 0 00 70 20
134515 SubChe SUBURBAN CHEVROLET 1011 2007 0 00 8 04
134516 TBEI TBEI LLC 1011 2007 0 00 53250
134517 TidsKy e Kyle and Leslie Tidstrom 10 112007 0 00 70 00
134518 TwiGar TWIN CITY GARAGE DOOR CO 1011 2007 0 00 212 76
134519 UltMar ULTIMATE MARTIAL ARTS INC 1011 2007 0 00 196 00
134520 UNIWA Y UNITED WAY 1011 2007 0 00 42 00
134521 VisSew Visu Sewer Clean Seal Inc 10 11 2007 0 00 20 494 28
34522 WacFar W ACONIA FARM SUPPLY 1011 2007 0 00 140 68
134523 WashDani DANIELLE WASHBURN 1011 2007 0 00 38 80
134524 WilDey WILLIAMS DEVELOPMENT LLC 10 11 2007 0 00 15 803 00
134525 WingRich RICHARD WING 10 112007 0 00 200 00
134526 WSB WSB ASSOCIATES INC 1011 2007 0 00 4 756 75
134527 WWGra WW GRAINGER INC 101 1 2007 0 00 89 61
Report Total 0 00 693 140 52
Page 3
466
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Amount
AARP
AARP AARP
Ck 134442 1011107
Inv 6074108
Line Item Date Line Item Description
10 05 07 defensife driving
Inv 6074108 Total
Line Item Account
101 1560 4300 170 00
170 00
Ck 134442 Total 170 00
Ck 134443 10 11107
Inv 6074111
Line Item Date Line Item Description
10 08 07 Defensive driving
Inv 6074111 Total
Line Item Account
101 1560 4300 130 00
130 00
Ck 134443 Total 130 00
AARP AARP 300 00
AARP 300 00
Action Fire Protection
ActFir Action Fire Protection
Ck 134444 1011 07
Inv 200702451
Line Item Date
10 09 07
10 09 07
10 09 07
Inv 200702451
Line Item Description
Refund duplicate permit 8587 Lk Riley Dr
Refund duplicate permit 8587 Lk Riley Dr
Refund duplicate permit 8587 Lk Riley Dr
Total
Line Item Account
101 0000 2022
101 1250 3302
101 1220 3309
2 10
I II 3
11125
12448
Ck 134444 Total 12448
Act Fir Action Fire Protection 124 48
Action Fire Protection 124 48
ALLIED BLACKTOP
AIlBla ALLIED BLACKTOP
Ck 134387 10 04 07
Inv 2
Line Item Date
0918 07
Inv 2 Total
Line Item Description
2007 Seal coat project 07 04
Line Item Account
420 4203 475 I 32 164 87
32 164 87
Ck 134387 Total 32 164 87
AIIBla ALLIED BLACKTOP 32 164 87
ALLIED BLACKTOP 32 164 87
AL TERNA TOR REBUILD CO
AltReb ALTERNATOR REBUILD CO
Ck 134388 10 04 07
Inv 39854
Line Item Date
0913 07
0913 07
Line Item Description
Alternator
Regulator
Line Item Account
101 1320 4140
101 1220 4140
25 56
332 72
Page I
467
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Inv 39854 Total
Amount
307 16
Ck 134388 Total 307 16
Ck 134445 101 1 07
Inv 091007
Line Item Date Line Item Description
091 0 07 24V 27SI alt
Inv 091007 Total
Line Item Account
101 1320 4120 208 74
208 74
Inv 091307
Line Item Date
0913 07
Inv 091307 Total
Line Item Description
alternator regulator
Line Item Account
101 1220 4140 307 16
307 16
Inv 092707
Line Item Date
09 27 07
Inv 092707 Total
Line Item Description
24V motorola caterpillar alt
Line Item Account
700 0000 4 I 20 197 03
197 03
Ck 134445 Total 712 93
AltReb AL TERNA TOR REBUILD CO 1 020 09
AL TERNA TOR REBUILD CO 1 020 09
AMERICAN SOLUTIONS
AmeSol AMERICAN SOLUTIONS
Ck 134389 10 04 07
Inv 3121271
Line Item Date
0917 07
0917 07
Inv 3121271
Line Item Description
Utility bill envelopes
Utility bill envelopes
Total
Line Item Account
700 0000 4340
701 0000 4340
362 80
362 80
725 60
Ck 134389 Total 725 60
AmeSol AMERICAN SOLUTIONS 725 60
AMERICAN SOLUTIONS 725 60
AN COM TECHNICAL CENTER
AncTec ANCOM TECHNICAL CENTER
Ck 134390 10 04 07
Inv 75061
Line Item Date
09 26 07
Inv 75061 Total
Line Item Description
pager repair
Line Item Account
101 1220 4531 12 00
12 00
Inv 75074
Line Item Date
09 27 07
Inv 75074 Total
Line Item Description
Repair radio
Line Item Account
101 1220 4531 176 33
176 33
Ck 134390 Total 188 33
AncTec ANCOM TECHNICAL CENTER 188 33
Page 2
468
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed I OJ 2 07 08 46
AN COM TECHNICAL CENTER
Amount
188 33
ARAMARK
ARAMAR ARAMARK Account
Ck 134446 10J 1 07
Inv 608525
Line Item Date
10 04 07
Inv 608525 Total
101 1170 4110
Line Item Description
coffee sugar cream
Line Item Account
101 1170 4110 158 84
158 84
Ck 134446 Total 158 84
ARAMAR ARAMARK 158 84
ARAMARK 158 84
ASSURANT EMPLOYEE BENEFITS
ASBENE ASSURANT EMPLOYEE BENEFITS
Ck 134391 10 04 07
Inv Nov07
Line Item Date
1 1 07
10 01 07
10 01 07
10 0107
10 01 07
Inv Nov07 Total
Line Item Description
Long Term Disability Insurance November
Long Term Disability Insurance November
Long Term Disability Insurance November
Long Term Disability Insurance November
Long Term Disability Insurance November
Line Item Account
720 0000 2015
210 0000 2015
701 0000 2015
700 0000 2015
101 0000 2015
9 21
19 95
77 84
93 59
1 002 30
1 184 47
Ck 134391 Total 1 18447
ASBENE ASSURANT EMPLOYEE BENEFITS 1 184 47
ASSURANT EMPLOYEE BENEFITS 1 184 47
AT T Mobility
attmob AT T Mobility
Ck 134447 IOJ 1 07
Inv 871186097
Line Item Date Line Item Description
09 21 07 Telephone charges
Inv 871186097 Total
Line Item Account
101 1310 4310 945
945
Ck 134447 Total 945
attmob AT T Mobility 9 45
AT T Mobility 9 45
BCA TRAINING DEVELOPMENT
BCA TRA BCA TRAINING DEVELOPMENT
Ck 134448 10 11 07
Inv 101007
Line Item Date
IOJ 0 07
Inv 10 I 007 Total
Line Item Description
criminal background check
Line Item Account
101 1120 4300 45 00
45 00
Ck 134448 Total 45 00
Page 3
469
CITY OF CHANHAS
User danielle
BCATRA
Accounts Payable
Check Detail Report Detail
Printed 10 12 07 08 46
BCA TRAINING DEVELOPMENT
Amount
45 00
BCA TRAINING DEVELOPMENT 45 00
BENIEK PROPERTY SERVICES INC
BenPro BENIEK PROPERTY SERVICES INC
Ck 134392 10 04 07
Inv 130755
Line Item Date
09 27 07
Inv 130755 Total
Ck 134392 Total
Ck 134449
Inv 130647
Line Item Date
09 20 07
Inv 130647 Total
Ck 134449 Total
BenPro
Line Item Description
Rough cut mowing trimming
Line Item Account
101 1260 4300 186 38
186 38
186 38
1011 07
Line Item Description
Irrigation repair
Line Item Account
463 0000 4300 3 928 80
3 928 80
3 928 80
BENIEK PROPERTY SERVICES INC 4 115 18
BENIEK PROPERTY SERVICES INC 4 115 18
BENJAMIN WALTER
BENJWALT BENJAMIN WALTER
Ck 134385 I I07
Inv 100307
Line Item Date
10 01 07
Inv 100307 Total
BERGERSON CASWELL INC
BerCas BERGERSON CASWELL INC
Ck 134450 10 11 07
Inv 4761
Line Item Date
10 02 07
Inv 4761 Total
Ck 134385 Total
BENJWALT
BENJAMIN WALTER
Inv 4772
Line Item Date
1 0 04 07
Inv 4772 Total
Ck 134450 Total
BerCas
Line Item Description
Population Holocaust Presentation
Line Item Account
101 1560 4130 100 00
100 00
100 00
BENJAMIN WALTER 100 00
100 00
Line Item Description
remove well pump video investigation
Line Item Account
700 7021 4300 2 325 00
2 325 00
Line Item Description
furnish install set up air lifting equip
Line Item Account
700 7021 4300 3 662 50
3 662 50
5 987 50
BERGERSON CASWELL INC 5 987 50
Page 4
470
CITY OF CHANHAS
User danieIle
Accounts Payable
Check Detail Report Detail
Printed 101 2 07 08 46
BERGERSON CASWELL INC
Amount
5 987 50
BOL TON MENK INC
BolMen BOL TON MENK INC
Ck 134451 101 1 07
InY 109813
Line Item Date
091 9 07
Iny 109813 Total
Line Item Description
Koehnen Area improvements 07 01
Line Item Account
601 6016 4752 27 657 00
27 657 00
Ck 134451 Total 27 657 00
BolMen BOLTON MENK INC 27 657 00
BOLTON MENK INC 27 657 00
BORDER STATES ELECTRIC SUPPLY
BorSta BORDER STATES ELECTRIC SUPPLY
Ck 134452 101 1 07
Iny 97051798
Line Item Date Line Item Description
10 04 07 lamp
Iny 97051798 Total
Line Item Account
10 1 1370 4510 22112
221 12
Ck 134452 Total 22112
BorSta BORDER STATES ELECTRIC SUPPLY 221 12
BORDER STATES ELECTRIC SUPPLY 221 12
BOY SCOUT TROOP 330
BOYSCO BOY SCOUT TROOP 330
Ck 134393 10 04 07
Iny 092407
Line Item Date
09 24 07
Iny 092407 Total
Line Item Description
Holiday wreaths for city hall
Line Item Account
101 1170 4110 98 00
98 00
Ck 134393 Total 98 00
Ck 134453
Iny 100807
Line Item Date
10 08 07
Iny 100807 Total
101 1 07
Line Item Description
senior center holiday wreath
Line Item Account
101 1170 4110 29 00
29 00
InY 101007
Line Item Date
10 10 07
Iny 101007 Total
Line Item Description
public works holiday wreath
Line Item Account
101 1370 4120 15 00
15 00
Ck 134453 Total 44 00
BoySco BOY SCOUT TROOP 330 142 00
BOY SCOUT TROOP 330 142 00
Page 5
471
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1OJ2 07 08 46
Amount
BRAUN INTERTEC CORPORATION
Bralnt BRAUN INTERTEC CORPORATION
Ck 134454 IOJ 1 07
Inv 284040
Line Item Date
09J 8 07
Inv 284040 Total
Line Item Description
Professional services Dogwood Rd Imp
Line Item Account
601 6015 4300 2 685 50
2 685 50
Ck 134454 Total 2 685 50
Bralnt BRAUN INTERTEC CORPORATION 2 685 50
BRAUN INTERTEC CORPORATION 2 685 50
CAMPBELL KNUTSON
CamKnu CAMPBELL KNUTSON
Ck 134455 10 1 I07
Inv 093007
Line Item Date Line Item Description
09 30 07 Professional services
Inv 093007 Total
Line Item Account
101 1140 4302 11 517 1 I
11 517 1 I
Ck 134455 Total 11 517 11
CamKnu CAMPBELL KNUTSON 11 517 11
CAMPBELL KNUTSON 11 517 11
CANON FINANCIAL SERVICES INC
Can Fin CANON FINANCIAL SERVICES INC
Ck 134456 10J I07
Inv 7392001
Line Item Date Line Item Description
10 01 07 Copier rental
Inv 7392001 Total
Line Item Account
101 1120 4410 753 88
753 88
Ck 134456 Total 753 88
Can Fin CANON FINANCIAL SERVICES INC 753 88
CANON FINANCIAL SERVICES INC 753 88
CARVER COUNTY ENVIRONMENTAL
CARENV CARVER COUNTY ENVIRONMENTAL
Ck 134457 IOJ 1 07
Inv 14101
Line Item Date
09 27 07
Inv 14101 Total
Line Item Description
recycle bulbs
Line Item Account
101 1550 4300 67 50
67 50
Inv 14106
Line Item Date
09 27 07
Inv 14106 Total
Line Item Description
recycle bulbs
Line Item Account
101 1550 4300 20 70
20 70
Ck 134457 Total 88 20
Page 6
472
CITY OF CHANHAS
User danielle
CARENV
Accounts Payable
Check Detail Report Detail
Printed 1 OJ 2 07 08 46
CARVER COUNTY ENVIRONMENTAL
Amount
88 20
CARVER COUNTY ENVIRONMENTAL 88 20
CARVER COUNTY TREASURER
CarTre CARVER COUNTY TREASURER
Ck 134394 10 04 07
Inv 092607
Line Item Date
09 26 07
Inv 092607 Total
Ck 134394 Total
Line Item Description
Copies of name changes
Line Item Account
101 1150 4300 30 75
30 75
30 75
Ck 134459 IOJ 1 07
Jnv SHERIO00982
Line Item Date Line Item Description
10 08 07 3rd Qtr police contract overtime
Inv SHERIO00982 Total
Ck 134459 Total
CarTre
Line Item Account
101 1210 4300 22 609 30
22 609 30
22 60930
CARVER COUNTY TREASURER 22 640 05
CARVER COUNTY TREASURER 22 640 05
CARVER SWCD
CARSWC CARVER SWCD
Ck 134458 IOJ 1 07
Inv 1258
Line Item Date
09J 9 07
Jnv 1258 Total
Inv 1259
Line Item Date
09J 9 07
Inv 1259 Total
Inv 1260
Line Item Date
09 19 07
Inv 1260 Total
Inv 1261
Line Item Date
09J 9 07
Jnv 1261 Total
Jnv 1262
Line Item Date
09J 9 07
Inv 1262 Total
Jnv 1263
Line Item Date
09J 9 07
Jnv 1263 Total
Line Item Description
Monitoring Chanhassen High School
Line Item Account
720 0000 4300 467 50
46750
Line Item Account
720 0000 4300 275 00
275 00
Line Item Account
400 0000 1155 8250
82 50
Line Jtem Account
400 0000 1155 82 50
82 50
Line Item Account
400 0000 1155 302 50
302 50
Line Item Account
720 0000 4300 137 50
137 50
Page 7
Line Item Description
Monitoring Dogwood Trail
Line Item Description
Monitoring Liberty on Bluff Creek
Line Item Description
Plan Review Paisley Park parking lot
Line Item Description
Monitoring The Arbors
Line Item Description
Monitoring Yosemite Ave
473
CITY OF CHANHAS
User danielle
Ck 134458 Total
CARSWC
CARVER SWCD
Accounts Payable
Check Detail Report Detail
Printed 10J2 07 08 46
Amount
1 347 50
CARVER SWCD 1 347 50
1 347 50
CATCO PARTS SERVICE
Cat Par CATCO PARTS SERVICE
Ck 134395 10 04 07
Inv 337640
Line Item Date Line Item Description
09 24 07 Valve
Inv 337640 Total
CENTERPOINT ENERGY MINNEGASCO
CENENE CENTERPOINT ENERGY MINNEGASCO
Ck 134460 10J I07
Inv 092807
Line Item Date
09 28 07
09 28 07
09 28 07
09 28 07
09 28 07
Inv 092807 Total
Ck 134395 Total
CatPar
CATCO PARTS SERVICE
Ck 134460 Total
CENENE
Line Item Account
101 1320 4140 50 14
50 14
50 14
CATCO PARTS SERVICE 50 14
50 14
Line Item Description
gas charges
gas charges
gas charges
gas charges
gas charges
Line Item Account
700 0000 4320
101 1550 4320
700 7019 4320
101 1170 4320
101 1190 4320
10 12
15 98
37 28
169 58
1 028 13
1 261 09
1 261 09
CENTERPOINT ENERGY MINNEGASCO 1 261 09
CENTERPOINT ENERGY MINNEGASCO 1 261 09
CENTURY TEL
CenTel CENTURY TEL
Ck 134461 IOJ I07
Inv 092107
Line Item Date
09 21 07
09 2 I07
09 21 07
09 21 07
09 2 I07
09 21 07
09 2 I07
09 2 I07
09 2 I07
09 2 I07
09 21 07
Inv 092107 Total
Ck 134461 Total
Line Item Description
Telephone charges
Telephone charges
Telephone charges
Telephone charges
Telephone charges
Telephone charges
Telephone charges
Telephone charges
Telephone charges
Telephone charges
Telephone charges
Line Item Account
101 1350 4310
101 1550 4310
10 1 1220 4310
101 1370 4310
101 1530 4310
101 1540 4310
101 1190 4310
700 0000 4310
701 0000 4310
700 7019 4310
101 1170 4310
4158
44 88
92 76
10771
132 74
134 64
159 34
204 73
204 73
321 51
1 144 85
2 58947
2 58947
Page 8
474
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
CenTel CENTURY TEL
Amount
2 589 47
CENTURY TEL 2 589 47
CHANHASSEN CHAMBER OF COMMERCE
ChaCha CHANHASSEN CHAMBER OF COMMERCE
Ck 134462 1011 07
Inv 6
Line Item Date
10 03 07
Inv 6 Total
Line Item Description
Sept luncheon Aanenson
Line Item Account
101 1420 4370 20 00
20 00
Ck 134462 Total 20 00
ChaCha CHANHASSEN CHAMBER OF COMMERCE 20 00
CHANHASSEN CHAMBER OF COMMERCE 20 00
CHANHASSEN GOODYEAR
ChaGoo CHANHASSEN GOODYEAR
Ck 134396 10 04 07
Inv 129269
Line Item Date Line Item Description
0816 07 tires
Inv 129269 Total
Line Item Account
101 1170 4140 146 22
146 22
Ck 134396 Total 146 22
ChaGoo CHANHASSEN GOODYEAR 146 22
CHANHASSEN GOODYEAR 146 22
CHANHASSEN VETERINARY
ChaVet CHANHASSEN VETERINARY
Ck 134398 10 04 07
Inv 093007
Line Item Date
09 30 07
Inv 093007 Total
Line Item Description
Veterinary services
Line Item Account
10 1 1260 4300 1 197 31
1 197 31
Ck 134398 Total 1 197 31
ChaVet CHANHASSEN VETERINARY 1 197 31
CHANHASSEN VETERINARY 1 197 31
CHASKA GATEW A Y PARTNERS
ChaGat CHASKA GATEW A Y PARTNERS
Ck 134463 1011 07
Inv 41225
Line Item Date
10 04 07
Inv 41225 Total
Line Item Description
Security escrow
Line Item Account
815 8221 2024 3 150 00
3 150 00
Ck 134463 Total 3 150 00
ChaGat CHASKA GATEWAY PARTNERS 3 150 00
Page 9
475
CITY OF CHANHAS
User danieJle
Accounts Payable
Check Detail Report Detail
Printed 101 2 07 08 46
CHASKA GATEWAY PARTNERS
Amount
3 150 00
Choice Inc
Choice Choice Inc Account
Ck 134399 10 04 07
Inv 092507
Line Item Date
09 25 07
Inv 092507 Total
101 1220 4350
Line Item Description
Fire station cleaning
Line Item Account
101 1220 4350 217 55
217 55
Ck 134399 Total 217 55
Choice Choice Inc 217 55
Choice Inc 217 55
CITY OF CHANHASSEN
CHANHA CITY OF CHANHASSEN
Ck 134397 10 04 07
Inv 18590000
Line Item Date Line Item Description
10 03 07 Reissue voided UB refund Acct 18590 000
10 03 07 Reissue voided UB refund Acct 18590 000
10 03 07 Reissue voided UB refund Acct 18590 000
Inv 18590000 Total
Line Item Account
720 0000 2020
701 0000 2020
700 0000 2020
3 86
33 04
46 08
82 98
Ck 134397 Total 82 98
CHANHA CITY OF CHANHASSEN 82 98
CITY OF CHANHASSEN 82 98
COMMISSIONER OF TRANSPORTATION
COMTRA COMMISSIONER OF TRANSPORTATION
Ck 134464 101 1 07
nv PAOOOl46541
Line Item Date
091 8 07
Inv PAOOOl46541
Line Item Description
Bituminous plant inspection
Total
Line tern Account
601 6016 4300 277 97
277 97
Ck 134464 Total 277 97
COMTRA COMMISSIONER OF TRANSPORTATION 27797
COMMISSIONER OF TRANSPORTATION 277 97
CORPORA TE EXPRESS
CorExp CORPORATE EXPRESS Account 101 1170 4110
Ck 134400 10 04 07
Inv 81677597
Line Item Date Line Item Description
091 8 07 Office suppl ies
nv 81677597 Total
Line Item Account
101 1170 4110 95 50
95 50
Ck 134400 Total 95 50
Page 10
476
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed lOll 2 07 08 46
Amount
Ck 134465 10 1 I07
InY 81920458
Line Item Date Line Item Description
09 26 07 office supplies
Iny 81920458 Total
Line Item Account
101 1170 4110 4139
4139
Iny 81956843
Line Item Date Line Item Description
09 28 07 office suppl ies
Iny 81956843 Total
Line Item Account
101 1170 4110 162 21
162 21
Ck 134465 Total 203 60
CorExp CORPORATE EXPRESS 299 10
CORPORATE EXPRESS 299 10
CRABTREE COMPANIES INC
CRABTR CRABTREE COMPANIES INC
Ck 134401 10 04 07
Iny 86960
Line Item Date
08 10 07
Iny 86960 Total
Line Item Description
Scanner glass white sticker foam seal
Line Item Account
101 1160 4530 159 98
159 98
Iny 87127
Line Item Date
08 27 07
Iny 87127 Total
Line Item Description
Scanner glass
Line Item Account
101 1160 4530 79 99
79 99
Ck 134401 Total 239 97
Crabtr CRABTREE COMPANIES INC 239 97
CRABTREE COMPANIES INC 239 97
CUMMINS NORTH CENTRAL
CumNor CUMMINS NORTH CENTRAL
Ck 134402 10 04 07
Iny 10096175
Line Item Date Line Item Description
09 21 07 Gasket Element air clnr
Iny 10096175 Total
Line Item Account
701 0000 4120 66 39
66 39
Iny 10096431
Line Item Date Line Item Description
09 24 07 Element air clnr
Iny 10096431 Total
Line Item Account
701 0000 4120 25 35
25 35
Ck 134402 Total 9174
CUM NOR CUMMINS NORTH CENTRAL 9174
CUMMINS NORTH CENTRAL 9174
Page II
477
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 101l2 07 08 46
Amount
DANKA OFFICE IMAGING COMPANY
Danka DANKA OFFICE IMAGING COMPANY
Ck 134466 lOll 1 07
Inv 705668673
Line Item Date
10 01 07
Inv 705668673
Line Item Description
copier rental
Total
Line Item Account
101 1120 4410 822 38
822 38
Ck 134466 Total 822 38
Danka DANKA OFFICE IMAGING COMPANY 822 38
DANKA OFFICE IMAGING COMPANY 822 38
Deep Rock Water Company
DeepRock Deep Rock Water Company
Ck 134467 lOll 1 07
Inv 60691 I
Line Item Date
09 25 07
Inv 6069 I I Total
Line Item Description
Temp Cold Cooler
Line Item Account
101 1550 4120 6 71
6 71
Ck 134467 Total 6 71
DeepRoek Deep Rock Water Company 6 71
Deep Rock Water Company 6 71
DELEGARD TOOL COMPANY
DelToo DELEGARD TOOL COMPANY
Ck 134468 10 11 07
Inv 53795
Line Item Date Line Item Description
09 27 07 valve block
Inv 53795 Total
Line Item Account
101 1370 4260 15 34
15 34
Ck 134468 Total 15 34
DelToo DELEGARD TOOL COMPANY 15 34
DELEGARD TOOL COMPANY 15 34
Engel Water Testing Ine
EngWat Engel Water Testing Ine
Ck 134403 10 04 07
Inv 074301
Line Item Date
09 26 07
Inv 074301 Total
Line Item Description
Water samples
Line Item Account
700 0000 4300 350 00
350 00
Ck 134403 Total 350 00
EngWat Engel Water Testing Ine 350 00
Engel Water Testing Ine 350 00
Page 12
478
CITY OF CHANHAS
User danielJe
FACTORY MOTOR PARTS COMPANY
FacMot FACTORY MOTOR PARTS COMPANY
Ck 134404 10 04 07
Inv 12712593
Line Item Date Line Item Description
09 24 07 Del 24 7yr
Inv 12712593 Total
Ck 134404 Total
Ck 134469 10 11 07
Inv 6972248
Line Item Date Line Item Description
0918 07 starter
Inv 6972248 Total
Ck 134469 Total
FacMot
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Amount
Line Item Account
701 0000 4120 85 19
85 19
85 19
Line Item Account
101 1320 4140 9541
9541
9541
FACTORY MOTOR PARTS COMPANY
180 60FACTORYMOTORPARTSCOMPANY
FSH COMMUNICATIONS LLC
FSHCom FSH COMMUNICATIONS LLC
Ck 134405 10 04 07
Inv 144723
Line Item Date
09 0107
Inv 144723 Total
Line Item Description
Telephone charges
Ck 134405 Total
Ck 134470
Inv 154084
Line Item Date
10 01 07
Inv 154084 Total
1011 07
Line Item Description
telephone charges
Ck 134470 Total
FSHCom
180 60
Line Item Account
101 1540 4310 127 80
127 80
127 80
Line Item Account
101 1540 4310 127 80
127 80
127 80
FSH COMMUNICATIONS LLC
255 60FSHCOMMUNICATIONSLLC
GB Technologies
GBTec GB Technologies
Ck 134471 1011 07
Inv 200702449
Line Item Date Line Item Description
10 09 07 refund permit overpayment
Inv 200702449 Total
Ck 134471 Total
GBTec GB Technologies
GB Technologies
255 60
Line Item Account
101 1250 4901 5 02
5 02
5 02
5 02
5 02
Page 13
479
CITY OF CHANHAS
User danielle
GENERAL PARTS INC
GenPar GENERAL PARTS INC
Ck 134472 101 1 07
Iny 5052482
Line Item Date Line Item Description
09 28 07 repair senior ctr dish washer
Iny 5052482 Total
Ck 134472 Total
GenPar GENERAL PARTS INC
GENERAL PARTS INC
GENEROUS BOB
GeneBob GENEROUS BOB
Ck 134406 10 04 07
Iny 092807
Line Item Date
09 28 07
Iny 092807 Total
Line Item Description
Mileage reimbursement
Ck 134406 Total
GeneBob GENEROUS BOB
GENEROUS BOB
GERHARDT TODD
GerhTodd GERHARDT TODD
Ck 134407 10 04 07
InY 100107
Line Item Date Line Item Description
10 01 07 October car allowance
Iny 100107 Total
Ck 134407 Total
GerhTodd GERHARDT TODD
GERHARDT TODD
GOPHER SIGN COMPANY
GopSig GOPHER SIGN COMPANY
Ck 134408 10 04 07
InY 72710
Line Item Date
09 20 07
InY 7271O Total
Line Item Description
Misc signs
Ck 134408 Total
GopSig GOPHER SIGN COMPANY
GOPHER SIGN COMPANY
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Amount
Line Item Account
101 1170 4530 477 00
477 00
477 00
477 00
477 00
Line Item Account
101 1420 4370 91 18
91 18
91 18
9118
91 18
Line Item Account
101 1120 4380 575 00
575 00
575 00
575 00
575 00
Line Item Account
101 1320 4560 1 140 10
1 140 10
1 140 10
1 140 10
1 140 10
Page 14
480
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 10 12 07 08 46
Amount
GS DIRECT INC
GSDir GS DIRECT INC
Ck 134473 10 11107
Inv 238456
Line Item Date
09 27 07
Inv 238456 Total
Line Item Description
paper
Line Item Account
101 1170 4110 57 35
57 35
Ck 134473 Total 57 35
GSDir GS DIRECT INC 57 35
GS DIRECT INC 57 35
HAMILTON MICHAEL
HamiMich HAMILTON MICHAEL
Ck 134474 10111107
Inv 101007
Line Item Date
10 10 07
Inv 101007 Total
Line Item Description
adult softball umpire
Line Item Account
101 1767 4300 264 00
264 00
Ck 134474 Total 264 00
HamiMich HAMILTON MICHAEL 264 00
HAMILTON MICHAEL 264 00
HAWKINS CHEMICAL
HA WCHE HAWKINS CHEMICAL
Ck 134475 10111107
Inv 1117127
Line Item Date Line Item Description
09 30 07 chlorine
Inv 1117127 Total
Line Item Account
700 0000 4160 70 00
70 00
Inv 1118294
Line Item Date Line Item Description
10 03 07 tank
Inv 1118294 Total
Line Item Account
700 7019 4550 475 12
475 12
Inv 1118298
Line Item Date Line Item Description
10 02 07 chlorinelinhibitorlhydrofluosilicic acid
Inv 1118298 Total
Line Item Account
700 7019 4160 6 856 83
6 856 83
Ck 134475 Total 7 401 95
HawChe HAWKINS CHEMICAL 7 401 95
HAWKINS CHEMICAL 7 401 95
HD Supply Watenvorks LTO
HOSup HD Supply Watenvorks L TO
Ck 134409 10 04 07
Inv 6011228
Line Item Date Line Item Description
09 19 07 Water meters radios
Line Item Account
700 0000 4250 4 91230
Page 15
481
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Inv 6011228 Total
Amount
4 912 30
Inv 6038654
Line Item Date Line Item Description
09 2107 Pipe
Inv 6038654 Total
Line Item Account
700 0000 4550 45958
459 58
Ck 134409 Total 5 371 88
HDSup HD Supply Watenvorks LTD 5 371 88
HD Supply Watenvorks LTD 5 371 88
HOISINGTON KOEGLER GROUP
HoiKoe HOISINGTON KOEGLER GROUP
Ck 134476 10 11 07
Inv 100407
Line Item Date
10 04 07
10 04 07
Inv 100407 Total
Line Item Description
Park Plan update
parks mapping
Line Item Account
410 0000 4300
410 0000 4300
735 00
1 110 00
1 845 00
Ck 134476 Total 1 845 00
HoiKoe HOISINGTON KOEGLER GROUP 1 845 00
HOISINGTON KOEGLER GROUP 1 845 00
Hoops Threads
HooThr Hoops Threads
Ck 134410 10 04 07
Inv 082707
Line Item Date Line Item Description
08 27 07 embroider shirts
Inv 082707 Total
Line Item Account
701 0000 4240 18 63
18 63
Ck 134410 Total 18 63
Ck 134477
Inv 100407
Line Item Date
10 04 07
Inv 100407 Total
10 11 07
Line Item Description
shirts embroidery
Line Item Account
101 1220 4240 1 590 00
1 590 00
Ck 134477 Total 1 590 00
HooThr Hoops Threads 1 608 63
Hoops Threads 1 608 63
ICMA RETIREMENT AND TRUST 457
ICMART ICMA RETIREMENT AND TRUST 457
Ck 134478 101 1 07
Inv
Line Item Date
10 09 07
10 09 07
10 09 07
Line Item Description
PR Batch 412 102007 ICMA
PR Batch 412102007 ICMA
PR Batch 412 10 2007 ICMA
Line Item Account
210 0000 2009
720 0000 2009
101 0000 2009
31 25
100 00
1 708 75
Page 16
482
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Iny Total
Amount
1 840 00
Ck 134478 Total 1 840 00
ICMART ICMA RETIREMENT AND TRUST 457 1 840 00
ICMA RETIREMENT AND TRUST 457 1 840 00
IMPERIAL PORTA PALACE
ImpPor IMPERIAL PORTA PALACE
Ck 134479 1011 07
Iny 5808
Line Item Date Line Item Description
10 05 07 Portable toilet rental
Iny 5808 Total
ImpPor IMPERIAL PORTA PALACE
Line Item Account
101 1550 4400 11336
113 36
Line Item Account
101 1550 4400 444 11
444 1 I
Line Item Account
101 1550 4400 1 492 07
1 492 07
Line Item Account
10 1 1550 4400 94 79
94 79
Line Item Account
101 1550 4400 69 23
69 23
2 213 56
2 213 56
2 213 56
Iny 5809
Line Item Date
10 05 07
Iny 5809 Total
Line Item Description
Portable toilet rental
Iny 5810
Line Item Date
10 05 07
Iny 58 I 0 Total
Line Item Description
Portable toilet rental
Inv 5811
Line Item Date
10 05 07
InY 5811 Total
Line Item Description
Portable toilet rental
InY 5812
Line Item Date
10 05 07
Iny 5812 Total
Line Item Description
Portable toilet rental
Ck 134479 Total
IMPERIAL PORTA PALACE
INDUSTRIAL SUPPLY CO INC
IndSup INDUSTRIAL SUPPLY CO INC
Ck 134412 10 04 07
Inv 1222684
Line Item Date Line Item Description
0912 07 V Belt
Iny 1222684 Total
Line Item Account
101 1170 4510 12 18
12 18
Ck 134412 Total 12 18
IndSup INDUSTRIAL SUPPLY CO INC 12 18
INDUSTRIAL SUPPLY CO INC 12 18
Page 17
483
CITY OF CHANHAS
User danieIle
INFRATECH
Infrat INFRA TECH
Ck 134413 10 04 07
InY 700581
Line Item Date
091 2 07
Iny 70058 I Total
Line Item Description
Marking flags
Ck 134413 Total
Ck 134480 101 I07
Iny 700598
Line Item Date Line Item Description
09 24 07 sensor
Iny 700598 Total
Ck 134480 Total
Infrat INFRA TECH
INFRATECH
INTERNATIONAL CODE COUNCIL
ICC INTERNATIONAL CODE COUNCIL
Ck 134411 10 04 07
Iny 436131IN
Line Item Date Line Item Description
09 24 07 Fire code
Iny 436131 IN Total
Ck 134411 Total
ICC
Accounts Payable
Check Detail Report Detail
Printed 101 2 07 08 46
Amount
Line Item Account
700 0000 4120 113 51
113 51
11351
Line Item Account
701 0000 4120 178 90
178 90
178 90
292 41
292 41
Line Item Account
101 1220 4210 170 50
17050
170 50
INTERNA TlONAL CODE COUNCIL 170 50
INTERNATIONAL CODE COUNCIL
J BERD MECHANICAL CONTRACTORS
JBeMec J BERD MECHANICAL CONTRACTORS
Ck 134481 101 I07
InY 200701795
Line Item Date Line Item Description
10 05 07 Refund water meter oyerpayement
Iny 200701795 Total
Ck 134481 Total
JBeMec
170 50
Line Item Account
700 0000 3664 83 00
83 00
83 00
J BERD MECHANICAL CONTRACTORS 83 00
J BERD MECHANICAL CONTRACTORS
JH LARSON COMPANY
JHLar JH LARSON COMPANY
Ck 134414 10 04 07
InY 412384001
Line Item Date
091 0 07
InY 412384001
Line Item Description
150W HPS Med Base 55V
Total
83 00
Line Item Account
101 1550 4120 48 27
48 27
Page 18
484
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 101 2 07 08 46
Inv 412384002
Line Item Date Line Item Description
09 2 I 07 Replacement lens
Inv 4 I 2384002 Total
Amount
Line Item Account
101 1550 4120 95 70
95 70
Inv 412554001
Line Item Date
091 8 07
Inv 41255400 I
Line Item Description
I OOOW MH MOG BT56 Clear
Total
Line Item Account
101 1550 4120 146 76
146 76
Inv 412554002
Line Item Date Line Item Description
0919 07 250W MH MOG BT 28 Clear
Inv 4 I 2554002 Total
Line Item Account
101 1550 4150 96 06
96 06
Ck 1344 I 4 Total 386 79
JHLar JH LARSON COMPANY 386 79
JH LARSON COMPANY 386 79
Kidd Plumbing Ine
KidPlu Kidd Plumbing Ine
Ck 134415 10 04 07
Inv 5037
Line Item Date
081 7 07
Inv 5037 Total
Line Item Description
Misc toilet repairs
Line Item Account
101 I 170 45 I 0 20950
209 50
Ck 134415 Total 209 50
KidPlu Kidd Plumbing Ine 209 50
Kidd Plumbing Ine 209 50
KIMLEY HORN AND ASSOCIATES INC
KimHor KIMLEY HORN AND ASSOCIATES INC
Ck 134482 10 11 07
Inv 3099188
Line Item Date Line Item Description
07 31 07 Professional services
Inv 3099188 Total
Line Item Account
400 0000 1155 1 620 00
1 620 00
Inv 3135867
Line Item Date Line Item Description
08 31 07 Dev inspection The Preserve
08 31 07 Dev inspection Arbors Development
Inv 3135867 Total
Line Item Account
400 0000 1155
400 0000 1155
405 00
2 250 00
2 655 00
Inv 3135869
Line Item Date Line Item Description
08 31 07 2007 St Improvement Project
Inv 3135869 Total
Line Item Account
601 6017 4752 4 624 25
4 624 25
Inv 3152138
Line Item Date Line Item Description
08 3 I07 2005 MUSA Area Expansion
Inv 3152138 Total
Line Item Account
602 6014 4300 7 424 25
7 424 25
Page 19
485
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1011 2 07 08 46
Amount
Inv 3152315
Line Item Date Line Item Description
08 3107 Dogwood Rd Jmprovements
Inv 3152315 Total
Line Item Account
601 6015 4752 23 545 24
23 545 24
Ck 134482 Total 39 868 74
KimHor KIM LEY HORN AND ASSOCIATES INC 39 868 74
KIMLEY HORN AND ASSOCIATES INC 39 868 74
KIND DEBRA
KINDDEBR KIND DEBRA
Ck 134416 10 04 07
Jnv 091807
Line Item Date
09 18 07
Jnv 091807 Total
Line Item Description
Graphic Design Format for the Comp Plan
Line Item Account
101 1421 4300 340 00
340 00
Ck 134416 Total 340 00
KINDDEBR KIND DEBRA 340 00
KIND DEBRA 340 00
Knowles Tom
KnowTom Knowles Tom
Ck 134483 10 11 07
Jnv 100807
Line Item Date
10 08 07
Jnv 100807 Total
Line Item Description
Barnyard Boogie supplies
Line Item Account
101 1711 4130 90 88
90 88
Ck 134483 Total 90 88
KnowTom Knowles Tom 90 88
Knowles Tom 90 88
KREMER SPRING ALIGNMENT INC
KreSpr KREMER SPRING ALIGNMENT INC
Ck 134484 1011 1 07
Jnv 24708
Line Item Date
09 26 07
Inv 24708 Total
Line Item Description
spring uboltladd 2 xl to rear springs
Line Item Account
101 1220 4520 529 00
529 00
Ck 134484 Total 529 00
KreSpr KREMER SPRING ALIGNMENT INC 529 00
KREMER SPRING ALIGNMENT INC 529 00
Page 20
486
CITY OF CHANHAS
User danielle
LAB SAFETY SUPPLY
LabSaf LAB SAFETY SUPPLY
Ck 134485 101 1 07
InY 1010236818
Line Item Date Line Item Description
09 20 07 speed bump
Iny 1010236818 Total
Ck 134485 Total
LabSaf LAB SAFETY SUPPLY
LAB SAFETY SUPPLY
LAKESHORE COMMUNICATIONS LLC
LakCom LAKESHORE COMMUNICATIONS LLC
Ck 134486 101 1 07
Iny I 16428
Line Item Date Line Item Description
10 02 07 ad
Iny 116428 Total
Ck 134486 Total
LakCom
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Amount
Line Item Account
101 1550 4150 343 28
343 28
343 28
343 28
343 28
Line Item Account
700 0000 4340 420 00
420 00
420 00
LAKESHORE COMMUNICATIONS LLC
420 00LAKESHORECOMMUNICATIONSLLC
Lano Equipment
LANEQI Lano Equipment
Ck 134487 101 1 07
Jny 172465
Line Item Date
09 27 07
Iny 172465 Total
Line Item Description
knob caplens
Iny 172955
Line Item Date
10 08 07
Jny 172955 Total
Line Item Description
Hex nut plow boltcutting edge
Ck 134487 Total
LanEql Lano Equipment
Lano Equipment
Larson Electronics LLC
Larsel Larson Electronics LLC
Ck 134417 10 04 07
Iny 5205
Line Item Date
08 09 07
Jny 5205 Total
Line Jtem Description
Black post mount lightinstall kit
Ck 134417 Total
420 00
Line Item Account
101 1550 4120 23 90
23 90
Line Item Account
101 1320 4120 196 96
196 96
220 86
220 86
220 86
Line Item Account
101 1260 4520 173 00
173 00
173 00
Page 21
487
CITY OF CHANHAS
User danielle
Larsel
Larson Electronics LLC
Larson Electronics LLC
LITTFIN MARK
UttMark LITTFIN MARK
Ck 134440 10 08 07
Iny 100307
Line Item Date
10 03 07
Iny 100307 Total
Iny 100507
Line Item Date
10 05 07
Iny 100507 Total
Ck 134440 Total
UttMark
LITTFIN MARK
Line Item Description
Food for firefighters
Line Item Description
Paper products for open house
LITTFIN MARK
MARCSISAK TOM
MarcTom MARCSISAK TOM
Ck 134488 1011 1 07
Iny 101007
Line Item Date
1011 0 07
1011 0 07
Iny 101007 Total
Ck 134488 Total
MarcTom
MARCSISAK TOM
Line Item Description
Adult softball umpire
Adult softball umpire
MARCSISAK TOM
MERLINS ACE HARDWARE
MerAce MERLINS ACE HARDWARE
Ck 134489 1011 1 07
Iny 093007
Line Item Date
09 30 07
09 30 07
09 30 07
09 30 07
09 30 07
09 30 07
09 30 07
09 30 07
09 30 07
09 30 07
09 30 07
09 30 07
Iny 093007 Total
Ck 134489 Total
Line Item Description
Misc supplies
Misc supplies
Misc supplies
Misc supplies
Misc supplies
Misc supplies
Misc supplies
Misc supplies
Misc supplies
Misc supplies
Misc supplies
Misc supplies
Accounts Payable
Check Detail Report Detail
Printed 1011 2 07 08 46
Amount
173 00
173 00
Line Item Account
101 1220 4370 43 19
43 19
Line Item Account
101 1220 4290 295 56
295 56
338 75
338 75
338 75
Line Item Account
101 1767 4300
101 1766 4300
880 00
1 936 00
2 816 00
2 816 00
2 816 00
2 816 00
Line Item Account
101 1260 4300
101 1320 4150
700 0000 4120
700 7019 4120
101 1220 4140
701 0000 4120
101 1600 4130
700 0000 4550
101 1320 4120
101 1220 4350
101 1220 4290
101 1550 4120
345
10 59
16 14
16 38
17 02
28 91
36 96
37 41
44 23
48 14
180 17
794 08
1 23348
1 23348
Page 22
488
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
MerAce MERLINS ACE HARDWARE
Amount
1 233 48
MERLINS ACE HARDWARE 1 233 48
METRO ATHLETIC SUPPLY
MetAth METRO ATHLETIC SUPPLY
Ck 134418 10 04 07
Inv 102597
Line Item Date
09 10 07
Inv 102597 Total
Line Item Description
Cold packs
Line Item Account
101 1530 4130 44 57
44 57
Ck 134418 Total 44 57
MetAth METRO ATHLETIC SUPPLY 44 57
METRO ATHLETIC SUPPLY 44 57
METROCALL
Metroc METROCALL
Ck 134491 1011107
Inv Q315834J
Line Item Date Line Item Description
10 02 07 pager charges
10 02 07 pager charges
10 02 07 pager charges
10 02 07 pager charges
10 02 07 pager charges
Inv Q315834J Total
Line Item Account
700 0000 4310
701 0000 4310
101 1320 4310
101 1220 4310
101 1260 4310
240
240
3 74
7 25
23 87
39 66
Ck 134491 Total 39 66
Metroc METROCALL 39 66
METROCALL 39 66
METROPOLITAN COUNCIL
METC02 METROPOLITAN COUNCIL Account 701 0000 4509
Ck 134419 10 04 07
Inv 857956
Line Item Date Line Item Description
10 02 07 Wastewater services
Inv 857956 Total
Line Item Account
701 0000 4509 116 450 37
116 450 37
Ck 134419 Total 116 450 37
METC02 METROPOLITAN COUNCIL 116 450 37
METROPOLITAN COUNCIL 116 450 37
METROPOLITAN FORD
MetFor METROPOLITAN FORD
Ck 134490 1011107
Inv 455299
Line Item Date
09 22 07
Inv 455299 Total
Line Item Description
Lamphinge
Line Item Account
101 1220 4140 231 16
231 16
Page 23
489
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Ck 134490 Total
Amount
23 1 16
MetFor METROPOLITAN FORD 231 16
METROPOLITAN FORD 23116
MN CHILD SUPPORT PAYMENT CTR
MNCHlL MN CHILD SUPPORT PAYMENT CTR
Ck 134492 101 1 07
Inv 10 09 07
Line Item Date Line Item Description
10 09 07 Pay Date 101 2 07 Case ID 00 I 472 I 6610 I
10 09 07 Pay Date 101 2 07 Case ID 001472166 I 0 I
Inv 10 09 07 Total
Line Item Account
701 0000 2006
700 0000 2006
33 56
384 06
417 62
Inv I00907
Line Item Date
10 09 07
Inv 100907 Total
Line Item Description
Pay Date 10 12 07 Case ID 001130771501
Line Item Account
101 0000 2006 34 61
34 61
Ck 134492 Total 452 23
MNCHlL MN CHILD SUPPORT PAYMENT CTR 452 23
MN CHILD SUPPORT PAYMENT CTR 452 23
MN CITY COUNTY MGMT ASSOC
MCMA MN CITY COUNTY MGMT ASSOC
Ck 134441 10 0807
Inv 100507
Line Item Date
10 05 07
Inv 100507 Total
Line Item Description
Renewal Gerhardt Todd
Line Item Account
101 1120 4360 80 00
80 00
Ck 134441 Total 80 00
MCMA MN CITY COUNTY MGMT ASSOC 80 00
MN CITY COUNTY MGMT ASSOC 80 00
MN DEPT OF NATURAL RESOURCES
MnNat MN DEPT OF NATURAL RESOURCES
Ck 134493 10 1107
Inv IOI007
Line Item Date
10 10 07
Inv 101007 Total
Line Item Description
Forestry class registration Sinclair
Line Item Account
720 7202 4370 20 00
20 00
Ck 134493 Total 20 00
MnNat MN DEPT OF NATURAL RESOURCES 20 00
MN DEPT OF NATURAL RESOURCES 20 00
Page 24
490
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed I OJ 2 07 08 46
Amount
MN NCPERS LIFE INSURANCE
NCPERS MN NCPERS LIFE INSURANCE
Ck 134501 IOJ 1 07
Inv
Line Item Date
10 09 07
10 09 07
10 09 07
Inv Total
Line Item Description
PR Batch 4 I 2 10 2007 NCPERS life insurance
PR Batch 4 I 2 10 2007 NCPERS Iife insurance
PR Batch 4 12 10 2007 NCPERS Iife insurance
Line Item Account
701 0000 201 I
700 0000 201 I
101 0000 201 I
159
1 6 I
12 80
16 00
Ck 13450 I Total 16 00
NCPERS MN NCPERS LIFE INSURANCE 16 00
MN NCPERS LIFE INSURANCE 16 00
MN RECREATION PARK ASSOC
MRPA MN RECREATION PARK ASSOC
Ck 134494 10J 1 07
Inv IOI007
Line Item Date Line Item Description
I OJ 0 07 Fall softball team sanction USSSA
Inv 101007 Total
Line Item Account
101 1767 4300 336 00
336 00
Ck 134494 Total 336 00
MRPA MN RECREATION PARK ASSOC 336 00
MN RECREATION PARK ASSOC 336 00
MN VALLEY ELECTRIC COOP
MVEC MN VALLEY ELECTRIC COOP
Ck 13442 I 10 04 07
Inv 092707
Line Item Date
09 27 07
09 27 07
09 27 07
09 27 07
Inv 092707 Total
Line Item Description
Electricity charges
Electricity charges
Electricity charges
Electricity charges
Line Item Account
700 0000 4320
101 1600 4320
701 0000 4320
101 1350 4320
20 55
32 78
371 02
3 501 48
3 925 83
Ck 134421 Total 3 925 83
MVEC MN VALLEY ELECTRIC COOP 3 925 83
MN VALLEY ELECTRIC COOP 3 925 83
MOORE MEDICAL
MooMed MOORE MEDICAL
Ck 134420 10 04 07
Inv 80693624EI
Line Item Date Line Item Description
09 25 07 Head immobilizer Stifneck collar
Inv 80693624EI Total
Line Item Account
101 1220 4130 129 00
129 00
Ck 134420 Total 129 00
MooMed MOORE MEDICAL 129 00
Page 25
491
MTI DISTRIBUTING INC
MTIDis MTI DISTRIBUTING INC
Ck 134496 lOll 1 07
Jnv 597777 00
Line Item Date
09 27 07
CJTY OF CHANHAS
User danielle
MOORE MEDICAL
MSRS
MSRS MSRS
Ck 134495
Jnv
Line Item Date
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 0907
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
10 09 07
Jnv Total
Ck 134495 Total
MSRS
MSRS
Accounts Payable
Check Detail Report Detail
Printed 1011 2 07 08 46
Amount
129 00
1011 1 07
Line Item Description
PR Batch 412 10 2007 Post Health 05 Emplr
PR Batch 412 J 0 2007 Post Health 3 Emplr
PR Batch 412 10 2007 Post Health 3 Emplr
PR Batch 412 10 2007 Post Health 05 Emplr
PR Batch 412102007 Post Health 05 Emplr
PR Batch 412 102007 Post Health 05 Emplr
PR Batch 412 102007 Post Health I Emplr
PR Batch 412102007 Post Health I Emplr
PR Batch 412 10 2007 Post Health I Emplr
PR Batch 412 10 2007 Ret Health 5
PR Batch 412 10 2007 Ret Health 3
PR Batch 412102007 Ret Health 3
PR Batch 412102007 Post Health I EmpJr
PR Batch 499 10 2007 Post Health 5 EmpJr
PR Batch 412 10 2007 Post Health 2 Emplr
PR Batch 412 10 2007 Ret Health 5
PR Batch 412 10 2007 Ret Health 5
PR Batch 412 J 0 2007 Ret Health 5
PR Batch 412 J 0 2007 Post Health 2 Emplr
PR Batch 412 10 2007 Post Health 05 Emplr
PR Batch 412 10 2007 Post Health 5 Emplr
PR Batch 412 10 2007 Post Health 3 Emplr
PR Batch 412 10 2007 Ret Health 1
PR Batch 41210 2007 Ret Health 1
PR Batch 41210 2007 Post Health 7 Emplr
PR Batch 412 10 2007 Ret Health 1
PR Batch 412 10 2007 Post Health 2 Emplr
PR Batch 412102007 Post Health I Emplr
PR Batch 412 102007 Ret Health 1
PR Batch 499 10 2007 Ret Health 5
PR Batch 412 10 2007 Ret Health 2
PR Batch 412 10 2007 Ret Health 2
PR Batch 412 10 2007 Ret Health 5
PR Batch 412 10 2007 Ret Health 5
PR Batch 412102007 Ret Health 3
PR Batch 412102007 Ret Health 7
PR Batch 412 10 2007 Ret Health 2
PR Batch 412 10 2007 Ret Health 1
PR Batch 498 10 2007 600 HR PAYOUT
Line Item Account
210 0000 2016
700 0000 2016
701 0000 2016
700 0000 2016
701 0000 2016
120 0000 2016
210 0000 2016
120 0000 2016
701 0000 2016
210 0000 2016
701 0000 2016
700 0000 2016
700 0000 2016
101 0000 2016
701 0000 2016
700 0000 2016
701 0000 2016
120 0000 2016
700 0000 2016
101 0000 2016
101 0000 2016
10 1 0000 20 16
210 0000 2016
120 0000 2016
101 0000 2016
701 0000 2016
101 0000 2016
10 1 0000 20 16
700 0000 2016
101 0000 2016
701 0000 2016
700 0000 2016
101 0000 2016
101 0000 2016
10 1 0000 20 16
10 1 0000 20 16
101 0000 2016
101 0000 2016
101 0000 2016
0 21
0 27
0 29
0 50
0 52
0 60
1 46
1 94
2 23
2 77
3 63
3 64
443
5 09
5 99
6 75
6 77
7 81
10 71
11 56
1543
1744
19 12
25 29
27 15
29 19
3249
42 63
58 01
66 55
78 65
139 69
15844
201 66
228 03
354 90
424 12
579 30
12 500 30
15 076 16
15 076 16
MSRS 15 076 16
15 076 16
Line Item Description
plug screw washer solenoid
Line Item Account
101 1550 4120 278 92
Page 26
492
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 10 12 07 08 46
Iny 597777 00 Total
Amount
278 92
InY 59791400
Line Item Date Line Item Description
09 28 07 flange o ring
InY 59791400 Total
Line Item Account
101 1550 4120 23 06
23 06
1nY 59791401
Line Item Date Line Item Description
10 01 07 flange o rings
InY 59791401 Total
Line Item Account
101 1550 4120 136 81
136 81
Ck 134496 Tota 438 79
MTlDis MTI DISTRIBUTING INC 438 79
MTI DISTRIBUTING INC 438 79
NAPA AUTO TRUCK PARTS
Napa NAPA AUTO TRUCK PARTS
Ck 134497 011 07
Iny 303794
Line Item Date Line Item Description
09 25 07 fuel filter
1nY 303794 Total
Line Item Account
101 220 4 I 40 11 09
11 09
Ck 134497 Total 1109
Napa NAPA AUTO TRUCK PARTS 1109
NAPA AUTO TRUCK PARTS 1109
NATIONAL BAG
NatBag NATIONAL BAG
Ck 134498 1011 07
Iny 6825939
Line Item Date Line Item Description
10 01 07 plastic bags
Iny 6825939 Total
Line Item Account
101 1250 4130 154 54
154 54
Ck 134498 Total 154 54
NatBag NATIONAL BAG 154 54
NATIONAL BAG 154 54
NATIONWIDE RETIREMENT SOLUTION
NATRET NATIONWIDE RETIREMENT SOLUTION
Ck 34499 101 07
Iny
Line Item Date
10 09 07
10 09 07
10 09 07
10 09 07
Iny Total
Line Item Description
PR Batch 412 10 2007 Nationwide Retirement
PR Batch 412102007 Nationwide Retirement
PR Batch 412 10 2007 Nationwide Retirement
PR Batch 412 10 2007 Nationwide Retirement
Line Item Account
720 0000 2009
701 0000 2009
700 0000 2009
101 0000 2009
50 00
278 23
438 75
4 910 11
5 677 09
Page 27
493
CITY OF CHANHAS
User danielle
Ck 134499 Total
Ck 134500
Iny
Line Item Date
10 08 07
Iny Total
Ck 134500 Total
NATRET
Accounts Payable
Check Detail Report Detail
Printed 10 12 07 08 46
Amount
5 677 09
101 1 07
Line Item Description
PR Batch 494 10 2007 USCM Fire Dept
Line Item Account
10 1 0000 2009 2 932 58
2 932 58
2 932 58
NATIONWIDE RETIREMENT SOLUTION 8 609 67
NATIONWIDE RETIREMENT SOLUTION 8 609 67
NEENAH FOUNDRY COMPANY
NEENAH NEENAH FOUNDRY COMPANY
Ck 134422 10 04 07
Iny 835370
Line Item Date
09 06 07
InY 835370 Total
Ck 134422 Total
NEENAH
Line Item Description
Adjusting ring
Line Item Account
101 1320 4120 894 60
894 60
894 60
NEENAH FOUNDRY COMPANY 894 60
NEENAH FOUNDRY COMPANY 894 60
NEXTEL
Nextel NEXTEL
Ck 134502 101 1 07
InY 092207
Line Item Date
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
09 22 07
Iny 092207 Total
Ck 134502 Total
Nextel
NEXTEL
Line Item Description
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Cell phone charges
Line Item Account
101 1530 4310
720 0000 4310
10 1 1260 4310
101 1170 4310
101 1130 4310
101 1160 4310
101 1600 4310
101 1310 4310
701 0000 4310
101 1520 4310
101 1370 4310
101 1550 4310
101 1120 4310
700 0000 4310
101 1320 4310
10 1 1220 4310
101 1250 4310
20 18
21 54
2446
3540
58 82
59 77
90 51
104 13
104 80
125 78
19249
223 66
228 37
247 92
292 22
294 22
409 89
2 534 16
2 534 16
NEXTEL 2 534 16
2 534 16
Page 28
494
CITY OF CHANHAS
User danielle
OEHME PAUL
OehmPaul OEHME PAUL
Ck 134503 1011 1 07
Iny 100307
Line Item Date
10 03 07
Iny 100307 Total
Line Item Description
2 I 2 meeting mileage
Ck 134503 Total
OehmPaul OEHME PAUL
OEHME PAUL
PARROTT CONTRACTING INC
ParCon PARROTT CONTRACTING INC
Ck 134504 lOll 1 07
InY 071452
Line Item Date Line Item Description
08 07 07 catch basin 7339 Frontier Trail
InY 071452 Total
Ck 134504 Total
ParCon
Accounts Payable
Check Detail Report Detail
Printed 10 12 07 08 46
Amount
Line Item Account
101 1310 4370 5 82
5 82
5 82
5 82
5 82
Line Item Account
720 0000 4300 6 400 00
6 400 00
6 400 00
PARROTT CONTRACTING INC
6 400 00PARROTTCONTRACTINGINC
PARTEK SUPPLY INC
ParSup PARTEK SUPPLY INC
Ck 134423 10 04 07
InY 21290
Line Item Date Line Item Description
09 27 07 Straw blanket
InY 21290 Total
Ck 134423 Total
ParSup PARTEK SUPPLY INC
PARTEK SUPPLY INC
Poiteyent Paul Judy
PoitPaul Poiteyent Paul Judy
Ck 134505 1011 1 07
Iny 2300MHR
Line Item Date Line Item Description
1011 0 07 Erosion 2300 Melody Hill Rd
Iny 2300MHR Total
Ck 134505 Total
PoitPaul Poiteyent Paul Judy
Poitevent Paul Judy
6 400 00
Line Item Account
101 1550 4150 44 73
44 73
44 73
44 73
44 73
Line Item Account
8 I 5 8202 2024 500 00
500 00
500 00
500 00
500 00
Page 29
495
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1OJ2 07 08 46
Amount
POSTMASTER
post POSTMASTER
Ck 134386 10 01 07
Inv 100107
Line Item Date
10 01 07
10 01 07
Inv 100107 Total
Line Item Description
September Utility Bills
September Utility Bills
Line Item Account
700 0000 4330
701 0000 4330
434 54
434 55
869 09
Ck 134386 Total 869 09
post POSTMASTER 869 09
POSTMASTER 869 09
PRAIRIE LAWN GARDEN
PraLaw PRAIRIE LAWN GARDEN
Ck 134424 10 04 07
Inv I 17402
Line Item Date
09J I07
Inv I 17402 Total
Line Item Description
ChainFuel cap asy
Line Item Account
101 1320 4120 50 78
50 78
Ck 134424 Total 50 78
PraLaw PRAIRIE LAWN GARDEN 50 78
PRAIRIE LAWN GARDEN 50 78
PRAIRIE RESTORATIONS INC
PraRes PRAIRIE RESTORATIONS INC
Ck 134506 10 11 07
Inv 109884
Line Item Date
10 02 07
Inv 109884 Total
Line Item Description
Hazeltine Woods East buckthorn spray
Line Item Account
720 7202 4300 1 345 92
1 345 92
Inv 109886
Line Item Date
0928 07
Inv 109886 Total
Line Item Description
Hazeltine Woods West buckthorn spray
Line Item Account
720 7202 4300 75841
75841
Inv 109888
Line Item Date
10 02 07
Inv 109888 Total
Line Item Description
Bluff Creek buckthorn spray
Line Item Account
720 7202 4300 1 06345
1 06345
Ck 134506 Tota 3 67 78
PraRes PRAIRIE RESTORATIONS INC 3 167 78
PRAIRIE RESTORATIONS INC 3 167 78
PROFESSIONAL TURF RENOVATION
ProTur PROFESSIONAL TURF RENOVATION
Ck 134425 10 04 07
Inv 200894
Line Item Date Line Item Description
09 12 07 Seed mix
Line Item Account
101 1550 4150 372 75
Page 30
496
CITY OF CHANHAS
User danielle
Inv 200894 Total
Ck 134425 Total
ProTur
Accounts Payable
Check Detail Report Detail
Printed 101 2 07 08 46
Amount
372 75
372 75
PROFESSIONAL TURF RENOVATION
PROFESSIONAL TURF RENOVATION
372 75
Quality Control Integration
qualcon Quality Control Integration
Ck 134426 10 04 07
Inv 90
Line Item Date
10 01 07
Inv 90 Total
Ck 134426 Total
qualcon
Line Item Description
DataRadio Integra TR Radio
Quality Control Integration
Quality Control Integration
QUILL CORPORATION
Quill QUILL CORPORATION
Ck 134427 10 04 07
Inv 1087840
Line Item Date Line Item Description
0920 07 Office supplies
Inv 1087840 Total
Ck 134427 Total
Ck 134507
Inv 12744
Line Item Date
10 0107
Inv 12744 Total
Ck 134507 Total
Quill
QUILL CORPORATION
10 11 07
Line Item Description
office supplies
QUILL CORPORATION
RBM SERVICES INC
RBMSer RBM SERVICES INC
Ck 134428 10 04 07
Inv 12496
Line Item Date
09 30 07
Inv 12496 Total
Inv 12497
Line Item Date
09 30 07
Inv 12497 Total
Line Item Description
Nightly janitorialshampoo carpet
Line Item Description
Nightly janitorial
372 75
Line Item Account
700 0000 4552 1 357 88
1 357 88
1 357 88
1 357 88
1 357 88
Line Item Account
101 1170 4110 371 63
371 63
371 63
Line Item Account
101 1170 4110 40732
407 32
407 32
778 95
778 95
Line Item Account
101 1170 4350 2 409 69
2409 69
Line Item Account
101 1190 4350 2 337 68
2 337 68
Page 31
497
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Ck 134428 Total
Amount
4 747 37
RBMSer RBM SERVICES INC 4 747 37
RBM SERVICES INC 4 747 37
Ryan Contracting Company
RyaCon Ryan Contracting Company
Ck 134508 1011 07
Inv 2
Line Item Date
08 31 07
Inv 2 Total
Line Item Description
Tanadoona DriveDogwood Rd
Line Item Account
601 6015 4751 103 236 03
103 236 03
Ck 134508 Total 103 236 03
RyaCon Ryan Contracting Company 103 236 03
Ryan Contracting Company 103 236 03
SEH
SEH SEH
Ck 134509
Inv 167337
Line Item Date
0914 07
Inv 167337 Total
1011 07
Line Item Description
comprehensive water plan
Line Item Account
700 0000 4300 154 60
154 60
Ck 134509 Total 154 60
SEH SEH 154 60
SEH 154 60
SENSUS METERING SYSTEM
SenMet SENSUS METERING SYSTEM
Ck 134429 10 04 07
Inv ZA80006914
Line Item Date Line Item Description
0919 07 Autoread software annual support
Inv ZA80006914 Total
Line Item Account
700 0000 4300 1 200 00
1 200 00
Ck 134429 Total 1 200 00
SenMet SENSUS METERING SYSTEM 1 200 00
SENSUS METERING SYSTEM 1 200 00
SHERWIN WILLIAMS
SheWiI SHERWIN WILLIAMS
Ck 134430 10 04 07
Inv 59602
Line Item Date Line Item Description
09 05 07 Drain valve rlk
Inv 59602 Total
Line Item Account
101 1320 4120 100 61
100 61
Page 32
498
CJTY OF CHANHAS
User danielle
Jnv 63059
Line Item Date
0913 07
Jnv 63059 Total
Ck J34430 Total
SheWiI
SHERWIN WILLIAMS
Line Jtem Description
paint
SHERWIN WILLIAMS
SHORE WOOD TRUE VALUE
ShoTru SHOREWOOD TRUE VALUE
Ck 134510 101 1 07
Jnv 80584
Line Item Date
09 02 07
Jnv 80584 Total
Jnv 80796
Line Item Date
0912 07
Jnv 80796 Total
Jnv 80848
Line Item Date
0916 07
Jnv 80848 Total
Ck 1345 I 0 Total
ShoTru
Line Item Description
misc supplies
Line Item Description
adhesive
Line Jtem Description
misc supplies
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Amount
Line Item Account
700 7019 4550 45 88
45 88
14649
146 49
146 49
Line Item Account
101 1220 4520 12 10
12 10
Line Item Account
101 1170 4530 7 98
7 98
Line Item Account
101 1220 4120 26 03
26 03
46 11
SHOREWOOD TRUE VALUE
SHOREWOOD TRUE VALUE
46 11
Sienna Corporation
SieCor Sienna Corporation
Ck 134431 10 04 07
Jnv 092007
Line Item Date
09 20 07
Jnv 092007 Total
Ck 134431 Total
SieCor
Sienna Corporation
SIGNS N SUCH
SIGNSU SIGNS N SUCH
Ck 134432 10 04 07
Inv 100107
Line Item Date
10 01 07
Jnv 100107 Total
Line Item Description
Reimburse Lyman Blvd trail
Sienna Corporation
Line Item Description
Remove Reinstall nameplates
46 11
Line Item Account
410 0000 4701 20 243 37
20 243 37
20 243 37
20 243 37
20 243 37
Line Item Account
101 1170 4300 45 00
45 00
Page 33
499
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Ck 134432 Total
Amount
45 00
SIGNSU SIGNS N SUCH 45 00
SIGNS N SUCH 45 00
SIGNSOURCE
Signso SIGN SOURCE
Ck 134511 1011 07
Inv 14657
Line Item Date
0918 07
Inv 14657 Total
Line Item Description
sign no boradheads allowed
Line Item Account
101 1550 4560 123 01
123 01
Inv 14754
Line Item Date
09 24 07
Inv 14754 Total
Line Item Description
road construction sign
Line Item Account
101 1320 4560 225 81
225 81
Ck 134511 Total 348 82
Signso SIGNSOURCE 348 82
SIGNSOURCE 348 82
SM HENTGES SONS
SMHen SM HENTGES SONS
Ck 134512 1011107
Inv 10
Line Item Date
08 31107
Inv 10 Total
Line Item Description
Bluff Creek Blvd Improvements
Line Item Account
602 6014 4751 69 717 02
69 717 02
Ck 134512 Total 69 717 02
SMHen SM HENTGES SONS 69 717 02
SM HENTGES SONS 69 717 02
SRF CONSULTING GROUP INC
SRFCon SRF CONSULTING GROUP INC
Ck 134433 10 04 07
Inv 59786
Line Item Date Line Item Description
07 31 07 ProfSvc Chan RetaiJ Comm Land Use
Inv 59786 Total
Line Item Account
101 1421 4300 1 302 65
1 302 65
Ck 134433 Total 1 302 65
SRFCon SRF CONSULTING GROUP INC 1 302 65
SRF CONSULTING GROUP INC 1 302 65
Page 34
500
CITY OF CHANHAS
User danieJle
Stratum One Fitness Inc
StaOne Stratum One Fitness Inc
Ck 134513 10 11 07
Inv 13763
Line Item Date
10 01 07
Inv 13763 Total
Ck 134513 Total
StaOne
Stratum One Fitness Inc
Line Item Description
Stairmaster
Stratum One Fitness Inc
STREICHER S
Streic STREICHER S
Ck 134514 10 11 07
Inv 1454632
Line Item Date Line Item Description
0817 07 shirtlbeltllanyard
Inv 1454632 Total
Inv 145623 I
Line Item Date Line Item Description
08 23 07 jacket patches
Inv 1456231 Total
Ck 134514 Total
Streic
STREICHER S
STREICHER S
SUBURBAN CHEVROLET
SubChe SUBURBAN CHEVROLET
Ck 134515 1011 07
Inv 5071921
Line Item Date Line Item Description
0919 07 shield
Inv 5071921 Total
Ck 134515 Total
SubChe
SUBURBAN CHEVROLET
SUBURBAN CHEVROLET
SWWC Service Cooperatives
SWWC SW WC Service Cooperatives
Ck 134434 10 04 07
Inv Nov07
Line Item Date
10 03 07
10 03 07
10 03 07
10 03 07
10 03 07
10 03 07
Line Item Description
November Health Insurance
November Health Insurance
November Health Insurance
November Health Insurance
November Health Insurance
November Health Insurance
Accounts Payable
Check Detail Report Detail
Printed 1012 07 08 46
Amount
Line Item Account
101 1530 4120 1 395 00
1 395 00
1 395 00
1 395 00
1 395 00
Line Item Account
101 1260 4240 3644
3644
Line Item Account
10 1 1260 4240 33 76
33 76
70 20
70 20
70 20
Line Item Account
101 1320 4140 8 04
8 04
8 04
8 04
8 04
Line Item Account
210 0000 2012
720 0000 2012
101 0000 2012
701 0000 2012
700 0000 2012
101 0000 2012
568 25
634 37
807 50
2 37130
3 592 80
33 09128
Page 35
501
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 1OJ2 07 08 46
Inv Nov07 Total
Amount
41 065 50
Ck 134434 Total 41 065 50
SWWC SW WC Service Cooperatives 41 065 50
SWWC Service Cooperatives 41 065 50
TBEI LLC
TBEI TBEI LLC
Ck 134516 10J 1 07
Inv 42474
Line Item Date
09 26 07
Inv 42474 Total
Line Item Description
mini spreader assy
Line Item Account
101 1320 4120 53250
53250
Ck 134516 Total 53250
TBEI TBEI LLC 532 50
TBEI LLC 532 50
Tidstrom Kyle and Leslie
TidsKyle Tidstrom Kyle and Leslie
Ck 134517 10 11 07
Inv 092507
Line Item Date
0925 07
Inv 092507 Total
Line Item Description
reimburse irrigation head
Line Item Account
601 6013 4300 70 00
70 00
Ck 134517 Total 70 00
TidsKyle Tidstrom Kyle and Leslie 70 00
Tidstrom Kyle and Leslie 70 00
TWIN CITY GARAGE DOOR CO
TwiGar TWIN CITY GARAGE DOOR CO
Ck 134518 10J 1 07
Inv 283961
Line Item Date
0920 07
Inv 283961 Total
Line Item Description
remove replace broken hinges rollers
Line Item Account
101 1550 4510 212 76
212 76
Ck 134518 Total 212 76
TwiGar TWIN CITY GARAGE DOOR CO 212 76
TWIN CITY GARAGE DOOR CO 212 76
ULTIMATE MARTIAL ARTS INC
UItMar ULTIMATE MARTIAL ARTS INC
Ck 134519 Ion 1 07
Inv 39
Line Item Date
IOJ 0 07
Inv 39 Total
Line Item Description
Self defense and safety training
Line Item Account
101 1731 4300 196 00
196 00
Page 36
502
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 10 12 07 0846
Ck 134519 Total
Amount
196 00
UltMar ULTIMATE MARTIAL ARTS INC 196 00
ULTIMATE MARTIAL ARTS INC 196 00
UNITED WAY
UNIWAY UNITED WAY
Ck 134520 1011 07
Inv
Line Item Date
10 09 07
Inv Total
Line Item Description
PR Batch 412 10 2007 United Way
Line Item Account
10 1 0000 2006 42 00
42 00
Ck 134520 Total 42 00
UNIW A Y UNITED WAY 42 00
UNITED WAY 42 00
VERIZON WIRELESS
Verizo VERIZON WIRELESS
Ck 134435 10 04 07
Inv 1761207694
Line Item Date Line Item Description
10 0 1 07 Cell phone charges
Inv 1761207694 Total
Line Item Account
101 1220 4310 7 24
7 24
Inv 1761277616
Line Item Date Line Item Description
09 20 07 Cell phone charges
Inv 1761277616 Total
Line Item Account
101 1220 4310 1 50
150
Ck 134435 Total 8 74
VERIZO VERIZON WIRELESS 8 74
VERIZON WIRELESS 8 74
Visu Sewer Clean Seal Ine
VisSew Visu Sewer Clean Seal Ine
Ck 134521 1011 07
Inv 7
Line Item Date
08 3 1 07
Inv 7 Total
Line Item Description
Sanitary sewer rehab
Line Item Account
701 7013 4751 20 494 28
20 494 28
Ck 134521 Total 20494 28
VisSew Visu Sewer Clean Seal Ine 20 494 28
Visu Sewer Clean Seal Ine 20 494 28
Page 37
503
CITY OF CHANHAS
User danielIe
Accounts Payable
Check Detail Report Detail
Printed 101 2 07 08 46
Amount
WACONIA FARM SUPPLY
WacFar WACONIA FARM SUPPLY
Ck 134436 10 04107
Inv K02566
Line Item Date Line Item Description
09 20 07 Dieselgas
Inv K02566 Total
Line Item Account
101 1370 4170 21 190 35
21 190 35
Ck 134436 Total 21 190 35
Ck 134522
Inv 090607
Line Item Date
09 06 07
Inv 090607 Total
101 1 07
Line Item Description
roundup
Line Item Account
101 1550 4150 140 68
140 68
Ck 134522 Tota 140 68
Wac Far WACONIA FARM SUPPLY 21 331 03
WACONIA FARM SUPPLY 21 331 03
WASHBURN DANIELLE
WashDani WASHBURN DANIELLE
Ck 134523 101 1 07
1nv 101007
Line Item Date
101 0 07
Inv 101007 Total
Line Item Description
seminar mileage
Line Item Account
101 1 30 4370 38 80
38 80
Ck 134523 Total 38 80
WashDani WASHBURN DANIELLE 38 80
WASHBURN DANIELLE 38 80
WASTE MANAGEMENT TC WEST
WASMA2 WASTE MANAGEMENT TC WEST
Ck 134437 10 04 07
In 64328015932
Line Item Date Line Item Description
07 0 I 07 Lk Ann garbage service
Inv 1643280 5932 Total
Line Item Account
101 600 4300 233 36
233 36
Inv 427751622825
Line Item Date Line Item Description
10 0107 Garbage service
10 0107 Garbage service
10 0107 Garbage service
10 0 1 07 Garbage service
1 I 07 Garbage service
I I 07 Garbage service
Inv 427751622825 Total
Line Item Account
01 1220 4350
101 1220 4350
101 190 4350
101 370 4350
101 1550 4350
101 1170 4350
6 10
7220
135 70
148 59
165 18
17443
7 2 20
Ck 134437 Total 945 56
WASMA2 WASTE MANAGEMENT TC WEST 945 56
Page 38
504
CITY OF CHANHAS
User danielle
Accounts Payable
Check Detail Report Detail
Printed 10112 07 08 46
WASTE MANAGEMENT TC WEST
Amount
945 56
WILLIAMS DEVELOPMENT LLC
WilDey WILLIAMS DEVELOPMENT LLC
Ck 134524 10 11 07
Iny DW5537
Line Item Date Line Item Description
1011 0 07 Security escrow Oaks of Minn 2nd
Inv DW5537 Total
Line Item Account
815 8221 2024 15 803 00
15 803 00
Ck 134524 Total 15 803 00
WilDey WILLIAMS DEVELOPMENT LLC 15 803 00
WILLIAMS DEVELOPMENT LLC 15 803 00
WING RICHARD
WingRich WING RICHARD
Ck 134525 1011 I07
Inv 093007
Line Item Date
09 30 07
Inv 093007 Total
Line Item Description
Station 2 cleaning
Line Item Account
101 1220 4350 200 00
200 00
Ck 134525 Total 200 00
WingRich WING RICHARD 200 00
WING RICHARD 200 00
WSB ASSOCIATES INC
WSB WSB ASSOCIATES INC
Ck 134526 1011 1 07
Inv 1694 020 8
Line Item Date Line Item Description
09 2 I07 Lift station 3 modification
Inv 1694 020 8 Total
Line Item Account
701 7015 4752 1 580 25
1 580 25
Inv 1694 030 8
Line Item Date Line Item Description
09 21 07 Comprehensive sanitary sewer plan
Inv 1694 030 8 Total
Line Item Account
700 0000 4300 3 176 50
3 176 50
Ck 134526 Total 4 756 75
WSB WSB ASSOCIATES INC 4 756 75
WSB ASSOCIATES INC 4 756 75
WW GRAINGER INC
WWGra WW GRAINGER INC
Ck 134527 1011 I07
Inv 9465436872
Line Item Date Line Item Description
09 27 07 wall pack
Inv 9465436872 Total
Line Item Account
700 7019 4120 89 61
89 61
Page 39
505
CITY OF CHANHAS
User danielle
Ck 134527 Total
WWGra
WW GRAINGER INC
WW GRAINGER INC
XCEL ENERGY INC
Xcel XCEL ENERGY INC
Ck 134438 10 04 07
InY 091707
Line Item Date
0911 7 07
09 17 07
0911 7 07
Iny 091707 Total
InY 092407
Line Item Date
09 24 07
09 24 07
Iny 092407 Total
Ck 134438 Total
Xcel
XCEL ENERGY INC
Line Item Description
Electricity charges
Electricity charges
Electricity charges
Line Item Description
Electricity charges
Electricity charges
XCEL ENERGY INC
Yen Peishan
YenPeis Yen Peishan
Ck 134439 10 04 07
Iny 2000795002
Line Item Date Line Item Description
10 0 1 07 Refund Lk Susan shelter rental
I I 07 Refund Lk Susan shelter rental
Iny 2000795002 Total
Ck 134439 Total
YenPeis
Yen Peishan
Total
Yen Peishan
Accounts Payable
Check Detail Report Detail
Printed 10112 07 08 46
Amount
89 61
89 61
89 61
Line Item Account
101 1170 4320
101 1170 4320
101 1190 4320
39 71
2 916 61
4 455 33
7 41 65
Line Item Account
101 1600 4320
101 1350 4320
97 85
19 267 80
19 365 65
26 777 30
26 777 30
26 777 30
Line Item Account
101 0000 2021
101 1541 3634
4 58
7042
75 00
75 00
75 00
75 00
693 140 52
Page 40
506