Loading...
03-23-2026 City Coucil AgendaitemCity Council Item March 23, 2026 Item Consider a Conditional Use Permit Request for Screened Outdoor Storage at 2100 Stoughton Avenue File No.Planning Case #2026-03 Item No: D.11 Agenda Section CONSENT AGENDA Prepared By Rachel Arsenault, Associate Planner Reviewed By SUGGESTED ACTION “The Chanhassen City Council approves the conditional use permit for screened outdoor storage at 2100 Stoughton Avenue, subject to staff conditions.” Motion Type Simple Majority Vote of members present Strategic Priority Development & Redevelopment SUMMARY Applicant is requesting a conditional use permit for screened outdoor storage at the property located at 2100 Stoughton Avenue. BACKGROUND The property is currently home to an office-industrial-warehouse building that is actively in use separate from this conditional use permit request. The west side of the property contains outdoor pickle vats that have occupied this space since roughly 1958, when the Gedney’s pickle factory started operations. In 2020, there was a development application for food processing and outdoor storage for six silos where the pickle vats are currently located. The City Council approved the development application on July 27, 2020; however, the project was never constructed. 166 DISCUSSION The property owner does not have a tenant to occupy the outdoor storage at this time. They are requesting approval for outdoor storage and will market the opportunity if approved. Since the tenant and specific items to be stored outdoors are unknown, staff has included a condition that the city be notified of any tenants and that prior administrative approval be granted before any future tenant occupies the space. Additionally, the property is bordered on three sides by the City of Chaska. Chanhassen city staff has provided the City of Chaska staff with the application materials and requested feedback on the proposal as it is primarily Chaska property owners that would be most directly impacted by the proposal. Comments from the City of Chaska have been included in the staff report as well as incorporated into the proposed CUP conditions. A public hearing was held at the Planning Commission meeting on March 3, 2026, and there were no testifiers. BUDGET RECOMMENDATION The Chanhassen Planning Commission recommends the City Council approve the requested conditional use permit for screened outdoor storage at 2100 Stoughton Avenue, subject to the conditions and comment listed in the staff report. ATTACHMENTS Development Application Narrative Plan Set Survey Staff Report Conditional Use Permit Findings of Fact CUP Planning Commission Minutes from 03-03-26 167 168 169 170 HWY 2 1 2 ENGLER BLVD A U D U B O N R D CHA S K A B L V D STOU G H T O N A V E CHASKA N. C H E S T N U T S T . FLYIN G C L O U D D R I V E SITE OUTDOOR STORAGE STOUGHTON AVENUE AUD U B O N R O A D COM M E R C I A L LOW DENSITY RESIDENTIAL MEDIUM DENSITY RESIDENTIAL 80’211’ CO M M E R C I A L 0 50 100 150 200 250 300 NO R T H OUTDOOR STORAGE SITE 1’ = 50’-0” DA T E P H I L L I P D . J O H N S O N NO . 1 0 8 2 3 I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N OR R E P O R T W A S P R E P A R E D B Y M E O R U N D E R M Y DI R E C T S U P E R V I S I O N A N D T H A T I A M A D U L Y LI C E N S E D A R C H I T E C T U N D E R T H E L A W S O F T H E ST A T E O F M I N N E S O T A RI V E R V A L L E Y B U S I N E S S C E N T E R 21 0 0 S T O U G H T O N A V E N U E CH A N H A S S E N , M N pr o p o s a l f o r : OU T D O O R S T O R A G E NO R T H SITE LOCATION INDEX TO DRAWINGS Architectural A 1 COVER A 2 AUDUBON ROAD PLANTING PLAN A 3 STOUGHTON AVENUE PLANTING PLAN A 4 SCHEDULES Civil Enginering C001 COVERSHEET C101 EXISTING CONDITION AND REMOVALS C201 SITE LAYOUT C301 GRADING AND DRAINAGE C401 ERSION AND SEDIMENT CONTROL C402 STORMWATER POLLUTON PREVENTION PLAN C501 DETAILS C502 DETAILS JAN. 26, 2026 A1 COVER INFILTRATION BASIN 1.5 M I L E S 413 ’ BUILDING OFFICE / INDUSTRIAL 4 0 ’ B U F F T E C H F E N C E C H A I N L I N K F E N C E EXISTING BITUMINUOUS REMOVE 12’ DIA X 8’ HIGH TANKS AND EXISTING BUTUMINUOUS TRUCK SCALE AND CONCRETE TO BE REMOVED. PROPOSED BITUMINUOUS ON COMPACTED UNDERLAYMENT 40’ BUFFTECH FENCE CHAIN LINK FENCE PROPOSED BITUMINUOUS ON COMPACTED UNDERLAYMENT EXISTING BITUMINUOUS INFILTRATION BASIN PROJECT DESCRIPTION EXTERIOR SITE STORAGE 2100 STOUGHTON AVENUE CHANHASSEN, MN THIS PROJECT IS TO PROVIDE OUTDOOR STORAGE AT 3101 STOUGHTON AVENUE, CHANHASSEN, MN. THE STORAGE AREA INSIDE THE FENCE WILL ENCLOSE ABOUT 3.75 ACRES. STORAGE INSIDE WILL MATCH THE HEIGHT OF THE FENCE ALONG THE STREET PERIMETER. THAT MAY INCREASE AS THE SIGHT LINE FROM THE EXTERIOR INCREASES AND ALLOWS AN INCREASE OF THE STORAGE HEIGHT. THE PROJECT INCLUDES REMOVAL OF EXISTING 12’ DIA. X 8’ HIGH TANKS AND A TRUCK SCALE FROM THE SITE. EXISTING GRADE LEVEL MATERIALS ON THE SITE INCLUDING BITUMINUOUS PAVEMENT, CONCRETE SCRAP MATERIALS, WOOD LIGHT POLES AND WIRING. THE SITE WILL BE PREPARED FOR A NEW BITUMINOUS SURFACE WITH REQUIRED DRAINAGE AND INFILTRATION BASINS. AN 8’ TALL OPAQUE FENCE WILL BE INSTALLED AROUND THE TWO SIDES OF THE STORAGE AREA THAT FACE A STREET AND THE REMAINING INTERIOR FACING FENCES WILL BE A 6’ HIGH CHAIN LINK FENCE WITH THREE ENTRANCE GATES. THE BUFFER YARD BETWEEN THE STREET AND THE FENCES WILL BE PLANTED WITH TREES, SHRUBS AND GROUND COVER. SEE THE ATTACHED CIVIL ENGINEERING DRAWINGS AND REPORT FOR SITE WORK AND DRAINAGE INFORMATION. FENCES: 8’ OPAQUE FENCE: BUFFTECH, GALVESTON CERTAGRAIN TEXTURE, ARTIC WHITE CONTRACTOR TO PROVIDE CUT SHEET FOR FINAL COLOR AND TEXTURE APPROVAL. 6’ CHAIN LINKFENCE , THREE 16’ WIDE DOUBLE GATE ENTRANCES. FENCES TO BE SET INTO THE GROUND ACCORDING TO THE MANUFACTURERS STANDARD PRACTICE. PLANTINGS: SEE SHEET A4 FOR PLANTING SELECTION AND INFORMATION. 1– 2 6 - ‘ 2 6 171 PUGPUG PUGPUGPUGPUGPUGPUGPUG POHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOH XX X X X X X X E 70 2 2 70 2 3 DS DS DS FF E = 7 5 9 . 4 6 DS DS DS DS DSDS DS DS FF E = 7 6 0 . 0 0 S ST E E E E S CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP C R O P CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO GA S GA S GA S GA S GAS GAS GAS GAS GA S GA S GA S GA S GA S GA S GAS GAS GAS GAS GAS GAS GAS GAS P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H STO ST O ST O ST O ST O STO STO STO WA T WA T WA T WA T WAT WAT WAT WAT WAT WAT WAT W A T WAT WAT SAN SAN SAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANSAN RE = 7 5 5 . 7 2 IN V S W = 7 5 2 . 0 7 RE = 7 5 5 . 7 IN V N E / N W = 7 5 1 . 7 7 RE = 7 5 6 . 3 7 IN V S W / N W = 7 5 1 . 8 7 RE=756.74 INV SE=753.34 RE = 7 5 6 . 4 2 IN V N / S E = 7 5 1 . 6 2 IN V E U N A B L E T O M E A S U R E RE = 7 5 6 . 4 8 IN V W = 7 5 2 . 5 8 RE = 7 5 7 . 2 0 IN V S = 7 5 2 . 5 5 RE = 7 5 7 . 9 0 IN V N E = 7 5 0 . 5 5 RE = 7 5 7 . 3 0 IN V N / W = 7 5 0 . 9 0 RIM=757.21 INV=747.46 RI M = 7 5 7 . 9 3 IN V = 7 4 8 . 5 8 W A T E R T O W E R TR A N S M I S S I O N LI N E T O W E R TA N K S EL E V A T E D W A L K W A Y BU I L D I N G BU I L D I N G EL E V A T E D W A L K W A Y TA N K S BU I L D I N G 756 756 757 757 757 75 7 757 757 758 758 758 758 758 758 759 75 9 759 759 759 755 755 755 755 760 760 760 754 754 756 756 756 756 757 757 757 757 758 758 758 758 759 759 759 759 757 757 757 757 758 759 75 7 757 757 757 758 7 5 8 7 5 9 7 5 9 759 7 5 8 759 756757758 756757758 759 759 759 759 75 8 75 9 757 758 756 757 758 759 758 75 7 RE T A I N I N G W A L L EL E C T R I C CA B I N E T AU D U B O N R O A D CHASKA BLVD . ( C O U N T Y R O A D 6 1 ) STOUGHTON AVENUE AR E A N O T F U L L Y S U R V E Y E D 125 . 0 0 PARCEL 1 PARCEL 2 PARCEL 3 T FO MAILE S SS W 83 2 7 75 3 . 3 2 US T L N I N V ST SSANSANSANSAN SA N SA N S A N SAN STO STO STO S T O S T O RI M = 7 5 8 . 9 6 IN V = 7 4 9 . 7 7 RI M = 7 5 9 . 2 1 IN V = 7 4 9 . 7 3 RI M = 7 5 5 . 6 1 IN V = 7 5 1 . 6 0 RI M = 7 5 8 . 3 3 IN V = 7 5 0 . 4 9 RE = 7 5 6 . 3 1 IN V N E / N W = 7 5 1 . 8 8 RE = 7 5 3 . 6 1 IN V S E = 7 5 3 . 3 2 SI G N RO C K L A N D S C A P I N G GU A R D R A I L 7 5 8 757 756 7 5 8 757 755 21 0 21 1 E EE EE E E E E E FEET 100500 1/ 2 7 / 2 0 2 6 1 0 : 3 6 A M Pr i n t D a t e : Fi l e L o c : C: \ C M \ C i v i l M e t h o d s , I n c \ C M I - D o c u m e n t s \ 7 . P r o j e c t s \ 2 3 0 8 9 _ G e d n e y S i t e I m p r o v e m e n t s \ 0 8 _ D R A W I N G S A N D S P E C I F I C A T I O N S \ C 3 D \ S h e e t s \ C 1 0 1 _ E X I S T I N G . d w g OWNER: PROJECT: SHEET: SHEET NO.: LIC. #: DATE: DAVID M POGGI 44573 I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 01-27-2026 CIVIL METHODS, INC. P.O. Box 28038 St. Paul, MN 55128 PH:763.210.5713 www.civilmethods.com DMPDESIGNED: DRAWN: CHECKED: DMP KEB NO.ISSUE DATE RIVER VALLEY BUSINESS CENTER 2100 STOUGHTON AVE CHANHASSEN, MN CORNERSTONE INVESTORS, LLC C101 EXISTING CONDITIONS & REMOVALS “ ” LEGEND: 17 3 PUGPUG PUGPUGPUGPUGPUGPUGPUG POHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOH XX X X X X X X DS DS DS FF E = 7 5 9 . 4 6 DS DS DS DS DSDS DS DS FF E = 7 6 0 . 0 0 S ST E E E E S FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO GA S GA S GA S GA S GAS GAS GAS GAS GA S GA S GA S GA S GA S GA S GAS GAS GAS GAS GAS GAS GAS GAS P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H STO ST O ST O ST O ST O STO STO STO WA T WA T WA T WA T WAT WAT WAT WAT WAT WAT WAT W A T WAT WAT SAN SAN SAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANSAN RE = 7 5 5 . 7 2 IN V S W = 7 5 2 . 0 7 RE = 7 5 5 . 7 IN V N E / N W = 7 5 1 . 7 7 RE = 7 5 6 . 3 7 IN V S W / N W = 7 5 1 . 8 7 RE=756.74 INV SE=753.34 RE = 7 5 6 . 4 2 IN V N / S E = 7 5 1 . 6 2 IN V E U N A B L E T O M E A S U R E RE = 7 5 6 . 4 8 IN V W = 7 5 2 . 5 8 RE = 7 5 7 . 2 0 IN V S = 7 5 2 . 5 5 RE = 7 5 7 . 9 0 IN V N E = 7 5 0 . 5 5 RE = 7 5 7 . 3 0 IN V N / W = 7 5 0 . 9 0 RIM=757.21 INV=747.46 RI M = 7 5 7 . 9 3 IN V = 7 4 8 . 5 8 TR A N S M I S S I O N LI N E T O W E R BU I L D I N G RE T A I N I N G W A L L EL E C T R I C CA B I N E T AU D U B O N R O A D CHASKA BLVD . ( C O U N T Y R O A D 6 1 ) STOUGHTON AVENUE AR E A N O T F U L L Y S U R V E Y E D 125 . 0 0 PARCEL 1 PARCEL 2 PARCEL 3 T FO MAILE S SS W 83 2 7 75 3 . 3 2 US T L N I N V ST SSANSANSANSAN SA N SA N S A N SAN STO STO STO S T O S T O RI M = 7 5 8 . 9 6 IN V = 7 4 9 . 7 7 RI M = 7 5 9 . 2 1 IN V = 7 4 9 . 7 3 RI M = 7 5 5 . 6 1 IN V = 7 5 1 . 6 0 RI M = 7 5 8 . 3 3 IN V = 7 5 0 . 4 9 RE = 7 5 6 . 3 1 IN V N E / N W = 7 5 1 . 8 8 RE = 7 5 3 . 6 1 IN V S E = 7 5 3 . 3 2 SI G N RO C K L A N D S C A P I N G GU A R D R A I L LEGEND: FEET 100500 1/ 2 7 / 2 0 2 6 1 0 : 3 7 A M Pr i n t D a t e : Fi l e L o c : C: \ C M \ C i v i l M e t h o d s , I n c \ C M I - D o c u m e n t s \ 7 . P r o j e c t s \ 2 3 0 8 9 _ G e d n e y S i t e I m p r o v e m e n t s \ 0 8 _ D R A W I N G S A N D S P E C I F I C A T I O N S \ C 3 D \ S h e e t s \ C 2 0 1 _ L A Y O U T . d w g OWNER: PROJECT: SHEET: SHEET NO.: LIC. #: DATE: DAVID M POGGI 44573 I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 01-27-2026 CIVIL METHODS, INC. P.O. Box 28038 St. Paul, MN 55128 PH:763.210.5713 www.civilmethods.com DMPDESIGNED: DRAWN: CHECKED: DMP KEB NO.ISSUE DATE RIVER VALLEY BUSINESS CENTER 2100 STOUGHTON AVE CHANHASSEN, MN CORNERSTONE INVESTORS, LLC C201 PRELIMINARY SITE LAYOUT 17 4 PUGPUG PUGPUGPUGPUGPUGPUGPUG POHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOH XX X X X X X X 70 2 2 70 2 3 DS DS DS FF E = 7 5 9 . 4 6 DS DS DS DS DSDS DS DS FF E = 7 6 0 . 0 0 S ST E E E E S CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP C R O P CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO GA S GA S GA S GA S GAS GAS GAS GAS GA S GA S GA S GA S GA S GA S GAS GAS GAS GAS GAS GAS GAS GAS P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H STO ST O ST O ST O ST O STO STO STO WA T WA T WA T WA T WAT WAT WAT WAT WAT WAT WAT W A T WAT WAT SAN SAN SAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANSAN RE = 7 5 5 . 7 2 IN V S W = 7 5 2 . 0 7 RE = 7 5 5 . 7 IN V N E / N W = 7 5 1 . 7 7 RE = 7 5 5 . 6 2 IN V N W = 7 4 9 . 7 2 IN V S E / S W U N A B L E T O M E A S U R E RE = 7 5 6 . 1 0 N O I N V E R T S RE = 7 5 6 . 3 7 IN V S W / N W = 7 5 1 . 8 7 RE=756.74 INV SE=753.34 RE = 7 5 6 . 4 2 IN V N / S E = 7 5 1 . 6 2 IN V E U N A B L E T O M E A S U R E RE = 7 5 6 . 4 8 IN V W = 7 5 2 . 5 8 RE = 7 5 7 . 2 0 IN V S = 7 5 2 . 5 5 RE = 7 5 7 . 9 0 IN V N E = 7 5 0 . 5 5 RE = 7 5 7 . 3 0 IN V N / W = 7 5 0 . 9 0 RIM=757.21 INV=747.46 RI M = 7 5 7 . 9 3 IN V = 7 4 8 . 5 8 TR A N S M I S S I O N LI N E T O W E R BU I L D I N G 756 756 757 757 757 75 7 757 757 758 758 758 758 758 758 759 75 9 759 759 759 755 755 755 755 760 760 760 754 754 756 756 756 756 757 757 757 757 758 758 758 758 759 759 759 759 757 757 757 757 758 759 75 7 757 757 757 758 7 5 8 7 5 9 75 9 759 7 5 8 759 756757758 756757758 759 759 759 759 75 8 75 9 757 758 756 757 758 759 758 75 7 RE T A I N I N G W A L L EL E C T R I C CA B I N E T AU D U B O N R O A D CHASKA BLVD . ( C O U N T Y R O A D 6 1 ) STOUGHTON AVENUE AR E A N O T F U L L Y S U R V E Y E D 125 . 0 0 PARCEL 1 PARCEL 2 PARCEL 3 T FO MAILE S SS W 83 2 7 75 3 . 3 2 US T L N I N V ST SSANSANSANSAN SA N S A N S A N SAN STO STO STO S T O S T O RI M = 7 5 8 . 9 6 IN V = 7 4 9 . 7 7 RI M = 7 5 9 . 2 1 IN V = 7 4 9 . 7 3 RI M = 7 5 5 . 6 1 IN V = 7 5 1 . 6 0 RI M = 7 5 8 . 3 3 IN V = 7 5 0 . 4 9 RE = 7 5 6 . 3 1 IN V N E / N W = 7 5 1 . 8 8 RE = 7 5 3 . 6 1 IN V S E = 7 5 3 . 3 2 SI G N RO C K L A N D S C A P I N G G U A R D R A I L 7 5 8 757 756 7 5 8 757 755 21 0 21 1 LEGEND: X.X% FEET 100500 1/ 2 7 / 2 0 2 6 1 0 : 3 7 A M Pr i n t D a t e : Fi l e L o c : C: \ C M \ C i v i l M e t h o d s , I n c \ C M I - D o c u m e n t s \ 7 . P r o j e c t s \ 2 3 0 8 9 _ G e d n e y S i t e I m p r o v e m e n t s \ 0 8 _ D R A W I N G S A N D S P E C I F I C A T I O N S \ C 3 D \ S h e e t s \ C 3 0 1 _ G R A D I N G . d w g OWNER: PROJECT: SHEET: SHEET NO.: LIC. #: DATE: DAVID M POGGI 44573 I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 01-27-2026 CIVIL METHODS, INC. P.O. Box 28038 St. Paul, MN 55128 PH:763.210.5713 www.civilmethods.com DMPDESIGNED: DRAWN: CHECKED: DMP KEB NO.ISSUE DATE RIVER VALLEY BUSINESS CENTER 2100 STOUGHTON AVE CHANHASSEN, MN CORNERSTONE INVESTORS, LLC C301 PRELIMINARY GRADING PLAN “ ” 17 5 PUGPUG PUGPUGPUGPUGPUGPUGPUG POHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOH XX X X X X X X 70 2 2 70 2 3 DS DS DS FF E = 7 5 9 . 4 6 DS DS DS DS DSDS DS DS FF E = 7 6 0 . 0 0 S ST E E E E S CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP C R O P CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP CROP FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO GA S GA S GA S GA S GAS GAS GAS GAS GA S GA S GA S GA S GA S GA S GAS GAS GAS GAS GAS GAS GAS GAS P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H STO ST O ST O ST O ST O STO STO STO WA T WA T WA T WA T WAT WAT WAT WAT WAT WAT WAT W A T WAT WAT SAN SAN SAN SAN SAN SAN SAN SAN SANSANSANSANSANSANSANSAN RE = 7 5 5 . 7 2 IN V S W = 7 5 2 . 0 7 RE = 7 5 5 . 7 IN V N E / N W = 7 5 1 . 7 7 RE = 7 5 6 . 3 7 IN V S W / N W = 7 5 1 . 8 7 RE=756.74 INV SE=753.34 RE = 7 5 6 . 4 2 IN V N / S E = 7 5 1 . 6 2 IN V E U N A B L E T O M E A S U R E RE = 7 5 6 . 4 8 IN V W = 7 5 2 . 5 8 RE = 7 5 7 . 2 0 IN V S = 7 5 2 . 5 5 RE = 7 5 7 . 9 0 IN V N E = 7 5 0 . 5 5 RE = 7 5 7 . 3 0 IN V N / W = 7 5 0 . 9 0 RIM=757.21 INV=747.46 RI M = 7 5 7 . 9 3 IN V = 7 4 8 . 5 8 TR A N S M I S S I O N LI N E T O W E R BU I L D I N G 756 756 757 757 757 75 7 757 757 758 758 758 758 758 758 759 75 9 759 759 759 755 755 755 755 760 760 760 754 754 756 756 756 756 757 757 757 757 758 758 758 758 759 759 759 759 757 757 757 757 758 759 75 7 757 757 757 758 7 5 8 7 5 9 75 9 759 7 5 8 759 756757758 756757758 759 759 759 759 75 8 75 9 757 758 756 757 758 759 758 75 7 RE T A I N I N G W A L L EL E C T R I C CA B I N E T AU D U B O N R O A D CHASKA BLVD . ( C O U N T Y R O A D 6 1 ) STOUGHTON AVENUE AR E A N O T F U L L Y S U R V E Y E D 125 . 0 0 PARCEL 1 PARCEL 2 PARCEL 3 T FO MAILE S SS W 83 2 7 75 3 . 3 2 US T L N I N V ST SSANSANSANSAN SA N SA N S A N SAN STO STO STO S T O S T O RI M = 7 5 8 . 9 6 IN V = 7 4 9 . 7 7 RI M = 7 5 9 . 2 1 IN V = 7 4 9 . 7 3 RI M = 7 5 5 . 6 1 IN V = 7 5 1 . 6 0 RI M = 7 5 8 . 3 3 IN V = 7 5 0 . 4 9 RE = 7 5 6 . 3 1 IN V N E / N W = 7 5 1 . 8 8 RE = 7 5 3 . 6 1 IN V S E = 7 5 3 . 3 2 SI G N RO C K L A N D S C A P I N G GU A R D R A I L 7 5 8 757 756 7 5 8 757 755 21 0 21 1 FEET 100 500 1/ 2 7 / 2 0 2 6 1 0 : 3 7 A M Pr i n t D a t e : Fi l e L o c : C: \ C M \ C i v i l M e t h o d s , I n c \ C M I - D o c u m e n t s \ 7 . P r o j e c t s \ 2 3 0 8 9 _ G e d n e y S i t e I m p r o v e m e n t s \ 0 8 _ D R A W I N G S A N D S P E C I F I C A T I O N S \ C 3 D \ S h e e t s \ C 4 0 1 _ E R O S I O N . d w g OWNER: PROJECT: SHEET: SHEET NO.: LIC. #: DATE: DAVID M POGGI 44573 I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 01-27-2026 CIVIL METHODS, INC. P.O. Box 28038 St. Paul, MN 55128 PH:763.210.5713 www.civilmethods.com DMPDESIGNED: DRAWN: CHECKED: DMP KEB NO.ISSUE DATE RIVER VALLEY BUSINESS CENTER 2100 STOUGHTON AVE CHANHASSEN, MN CORNERSTONE INVESTORS, LLC C401 EROSION & SEDIMENT CONTROL LEGEND: 17 6 7687 MF 1/2 IN OPEN 758.64 7967 MF 1/2 IN LS13792 757.52 7006 MF 1/2 IN IP LS19840 757.90 7010 MF 1/2 IN IP LS 8792 ? 758.98 7742 MF 1/2 IN CAP BROKE 759.41 7966 MF 1/2 IN OPEN 759.34 7968 MF 1/2 IN CAP BROKE 755.10 S E E E E S FO E S S S S 7022 7023 7029758.31USTRR B 7030 758.23USTRR 7031758.30 USTRR 7032758.53USTRR E7033758.97USTRR B 7034758.63USTRR 7035758.61USTRR7036758.74USTRR7040 758.49USTRR B 7041 758.18USTRR 7042 758.17USTRR7043758.61USTRR E7044758.58USTRR B 7045757.69USTRR 7046757.61USTRR 7047758.48USTRR E FFE=759.46 FFE=760.00 S E E E E S 756 756 757 757 757 757 757 757 758 758 758 758 758 758 759 759 759 759 759 755 755 755755 760760 760 754754 756 756 756 756 757 757 757 757 758 758 758 758 759 759 759 759 757 757 757 757 758 759 757 757 757 757 758 758 759 759 759 758 759 756 757 758 756 757 758759 759 759 759 758759 757 758 756 757758 759 758 757 759 758 757 758 8136758.17LSMI 8137758.32LSMI 8138758.62LSMI 8139758.68LSMI 8140758.70 LSMI 8141758.91LSMI 8142758.76LSMI CE ETFO8160758.14LSMS B BASE BROKE 8161758.11LSMS 8162757.37LSMS 8163757.35LSMS CLMAIL E S SS 8327753.32USTLN INV S 8335 758 757 756 758 757755 7000922.45CCBM 210 211 10013756.82LCMI B GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NPDES/SDS PROGRAM (MNR100001) : Feet 0 1000 2000 LEGEND HYDROLOGIC SOIL GROUP TYPE A HYDROLOGIC SOIL GROUP TYPE B HYDROLOGIC SOIL GROUP TYPE C HYDROLOGIC SOIL GROUP TYPE D LEGEND HYDROLOGIC SOIL GROUP TYPE A HYDROLOGIC SOIL GROUP TYPE B HYDROLOGIC SOIL GROUP TYPE C HYDROLOGIC SOIL GROUP TYPE D HYDROLOGIC SOIL GROUP TYPE B HYDROLOGIC SOIL GROUP TYPE C HYDROLOGIC SOIL GROUP TYPE A/D HYDROLOGIC SOIL GROUP TYPE B/D HYDROLOGIC SOIL GROUP TYPE C/D C402 SWPPP 1/ 2 7 / 2 0 2 6 1 0 : 3 8 A M Pr i n t D a t e : Fi l e L o c : C: \ C M \ C i v i l M e t h o d s , I n c \ C M I - D o c u m e n t s \ 7 . P r o j e c t s \ 2 3 0 8 9 _ G e d n e y S i t e I m p r o v e m e n t s \ 0 8 _ D R A W I N G S A N D S P E C I F I C A T I O N S \ C 3 D \ S h e e t s \ C 4 0 2 _ S W P P P . d w g OWNER: PROJECT: SHEET: SHEET NO.: LIC. #: DATE: DAVID M POGGI 44573 I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 01-27-2026 CIVIL METHODS, INC. P.O. Box 28038 St. Paul, MN 55128 PH:763.210.5713 www.civilmethods.com DMPDESIGNED: DRAWN: CHECKED: DMP KEB NO.ISSUE DATE RIVER VALLEY BUSINESS CENTER 2100 STOUGHTON AVE CHANHASSEN, MN CORNERSTONE INVESTORS, LLC 17 7 C501 DETAILS 1/ 2 7 / 2 0 2 6 1 0 : 3 8 A M Pr i n t D a t e : Fi l e L o c : C: \ C M \ C i v i l M e t h o d s , I n c \ C M I - D o c u m e n t s \ 7 . P r o j e c t s \ 2 3 0 8 9 _ G e d n e y S i t e I m p r o v e m e n t s \ 0 8 _ D R A W I N G S A N D S P E C I F I C A T I O N S \ C 3 D \ S h e e t s \ C 5 0 1 _ D E T A I L S . d w g OWNER: PROJECT: SHEET: SHEET NO.: LIC. #: DATE: DAVID M POGGI 44573 I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 01-27-2026 CIVIL METHODS, INC. P.O. Box 28038 St. Paul, MN 55128 PH:763.210.5713 www.civilmethods.com DMPDESIGNED: DRAWN: CHECKED: DMP KEB NO.ISSUE DATE RIVER VALLEY BUSINESS CENTER 2100 STOUGHTON AVE CHANHASSEN, MN CORNERSTONE INVESTORS, LLC *DETAILS ARE NOT TO SCALE* 17 8 C502 DETAILS 1/ 2 7 / 2 0 2 6 1 0 : 3 8 A M Pr i n t D a t e : Fi l e L o c : C: \ C M \ C i v i l M e t h o d s , I n c \ C M I - D o c u m e n t s \ 7 . P r o j e c t s \ 2 3 0 8 9 _ G e d n e y S i t e I m p r o v e m e n t s \ 0 8 _ D R A W I N G S A N D S P E C I F I C A T I O N S \ C 3 D \ S h e e t s \ C 5 0 1 _ D E T A I L S . d w g OWNER: PROJECT: SHEET: SHEET NO.: LIC. #: DATE: DAVID M POGGI 44573 I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 01-27-2026 CIVIL METHODS, INC. P.O. Box 28038 St. Paul, MN 55128 PH:763.210.5713 www.civilmethods.com DMPDESIGNED: DRAWN: CHECKED: DMP KEB NO.ISSUE DATE RIVER VALLEY BUSINESS CENTER 2100 STOUGHTON AVE CHANHASSEN, MN CORNERSTONE INVESTORS, LLC *DETAILS ARE NOT TO SCALE* 17 9 MAPLE Amur ornamental SYMBOL NAME SIZE QUAN MATURE SIZE DECIDUOUS TREES CANOPY TREES MAPLE, AUTUMN BLAZE Acer X freemanii MAPLE, SUGAR Acer saccharum LINDEN, GREENSPIRE, LITTLE LEAF Tilia cordata HACKBERRY, PRAIRIE SENTINEL Celtis occidentalis UNDERSTORY TREES (ornamental) SHRUBS MAPLE, AMUR FLAME Acer ginra ‘Flame’ BARBERRY CONCORDE Barberis thunbengil ’Concorde’ SERVICBERRY, REGENT Amelanchier alinifolia ‘Regent” PLANTING SCHEDULE CONIFEROUS TREES NORWAY PINEPicea resinosa SPRUCE, BLACK HILLS Pice glauca densata 8 10 6 west MAPLE, NORWAY Acer platanoides family Sapindaceae MAPLE, EMERALD LUSTRE Acer plantanoides ‘Pond’ ten yr ht 25’ 40’-80’/30-60’-- common 40’-50’ / 30-40’Sapindaceae height / width 40’-50’ / 30-40’Sapindaceae 40’-50’ / 25’-30’Malvaceae LINDEN, AMERICAN SENTRY Tilia americana Malvaceae 40’-50’ / 20’-25’ 40’-50’ / 10’-15’Ulmaceae BIRCH, RIVER Betula nigra Betulaceae 65’-100’ / 30-40’ PLANTINGsouth 2 - 3 2 - 3 2 413’291’ 1 2 2 1 - - - 8 4 3 6 9 -5 24 shrub 12 undrstory 8 canopy trees req’d 18 shrub 16 understory 6 canopy trees req’d re q ’ d 1 re q ’ d 1 1 1 1 1 1 1 re q ’ d re q ’ d re q ’ d re q ’ d re q ’ d 9 8 8 6 6 6 4 4 4 4 not in calculation not in calculation single stemSERVICBERRY, SHADBLOW Amelanchier alinifolia ‘Regent” 1 3 ** * 8 6 MAPLE, NORWAY Acer platanoides Sapindaceae 1*MAPLE, AUTUMN BLAZE Acer X freemanii Sapindaceae 1*LINDEN, GREENSPIRE, LITTLE LEAF Tilia cordata Malvaceae 3*HACKBERRY, PRAIRIE SENTINEL Celtis occidentalis Ulmaceae 1** 8 8 BARBERRY CONCORDE Barberis thunbengil ’Concorde’5 *PLANTS OUTSIDE OF REQUIRED AREAS ( SIDE LOT AND DEEP FENCE SETBACK ). MAY BE PLANTED AT OWNERS DISCRETION AND TIMING. DA T E P H I L L I P D . J O H N S O N NO . 1 0 8 2 3 I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N OR R E P O R T W A S P R E P A R E D B Y M E O R U N D E R M Y DI R E C T S U P E R V I S I O N A N D T H A T I A M A D U L Y LI C E N S E D A R C H I T E C T U N D E R T H E L A W S O F T H E ST A T E O F M I N N E S O T A RI V E R V A L L E Y B U S I N E S S C E N T E R 21 0 0 S T O U G H T O N A V E N U E CH A N H A S S E N , M N pr o p o s a l f o r : OU T D O O R S T O R A G E JAN. 26, 2026 A4 SCHEDULES 10’ MIN. HT. OR MIN. 21/2” CALIPER “ “ “ “ “ 24” MIN. HT. “ “ TOTAL 24” MIN. HT. 6’-7’ MIN. HT. OR MIN. 11/2” CALIPER BALL AND BURLAP “ “ “ “ “ SEPARATE OR CUT TO SINGLE STEM IN 2-3 YEARS BALL AND BURLAP 2-4 GAL. CONTN’R 2-4 GAL. CONTN’R “ “ SPACING SEE PLANTING PLAN SHEET A2 AND A3 FOR SPACING “ “ “ “ “ 30”-60” / 24”-36” 15’-25’ / 10’-20’ 15’-25’ / 10’-20’Amelanchier canadensis OPTION 15”-24” / 15”-24” 30”-60” / 40”-60” 10’-15’ SEPARATION “ 1- 2 6 - ‘ 2 6 30’ 100’ 25’ 20’ 15’ Plant unit multiplier 30’ street pavement 6’ SIGHT LINE AT PROPERTY LINE 8’ TREES AT PLANTING 8’ FENCE SIGHT LINE HEIGHT INCREASES 2’ EVERY 10’ 10’-0” 10’-0” 12’-0” 10’-0”10’-0” SECTION AT AUDUBON AVENUE 15’ PROPERTY LINE TO FENCE 1/16” = 1’-0” existing parkin g d i m e n s i o n existing parking d i m e n s i o n existing parking dime n s i o n existing parking dim e n s i o n existing parking dimen s i o n existing parking dime n s i o n existing parking dimension existing parking dimension MATURE TREES existing p a r k i n g d i m e n s i o n existing pa r k i n g d i m e n s i o n PL office industrial commercial 8’- FENCE 20’-0” 30’ street pavement 24 ’ - 0 ” as s u m e d pavement varies off center in ROW edge of pavement varies gas power underground power above ground sewer 18’-0” MATURE TREES 8’ FENCE6’ SIGHT LINE AT PROPERTY LINE SIGHT LINE HEIGHT INCREASES 2’ EVERY 38’ 38’-0”38’-0” 12’-0” STORAGE HEIGHT 10’-0” STORAGE HEIGHT @76’-0” FROM PROP LINE 2% SLOPE OVER CLASS V MATERIAL existing parkin g d i m e n s i o n existing parking d i m e n s i o n existing parking dimen s i o n existing parking dim e n s i o n existing parki n g d i m e n s i o n existing parking di m e n s i o n existing parking dimens i o n existing parking di m e n s i o n existing parking di m e n s i o n existing parking dimension existing parking dimensi o n existing parking dim e n s i o n existin g p a r k i n g d i m e n s i o n existing p a r k i n g d i m e n s i o n existing parking dimens i o n existing parking dimens i o n existing parking dimensionexisting parking dimension DECIDUOUS TREE SECTION AT STOUGHTON AVENUE 38’ PROPERTY LINE TO FENCE 1/16” = 1’-0” x .4 @ 38’ 6 291’ along Stoughton Avenue total plants PP 16 ’ OVERS T O R Y T R E E Plant unit multiplier 4 2 12 understory 6 canopy trees LL/LD & MD residential office industrial PL 8’- FENCE OVERS T O R Y T R E E x . 4 @ 3 8 ’ SEWER POWER UNGRND POWER OVERHD GAS ORNA M E N T A L T R E E ORNA M E N T A L T R E E ORNA M E N T A L T R E E ORNA M E N T A L T R E E SHRU B S SHRU B S 413’ along Audubon Road x .4 x .4 #/100’ OVERS T O R Y T R E E ORNA M E N T A L T R E E SHRU B S OVERS T O R Y T R E E ORNA M E N T A L T R E E ORNA M E N T A L T R E E ORNA M E N T A L T R E E x 1 @ 1 5 ’ x .4 @ 38’ 6 18 shrub total plantsPlant unit multiplier 4 2 x .4 x .4 #/100’ x2.91’ x2.91’ x2.91’ x 1 @ 15’ 6 25 shrub total plantsPlant unit multiplier 4 2 x 1 x 1 #/100’ x4.13’ x4.13’ x4.13’ 13 understory 9 canopy trees 413 291 CITY OF CHANHASSEN IMAGES FROM SECTION 20.1176 (f) (2) e OF CITY ORDINANCE EXPANDED FROM 30’ SETBACK ILLUSTRATION 75’ 8’ 180 NO R T H 10 500 100 RIVER VALLEY OUTDOOR STORAGE 1” = 20’-0” BUFFER ELEVATION 1”-20’-0” 8’ FENCE S T O U G H T O N A V E N U E ELEVATIONPPS T O U G H T O N A V E N U E ELEVATION 8’ FENCE 10 500 100 STOUGHTON AVE PLAN EXISTING TREES AND SHRUBS S T O U G H T O N A V E N U E 6 0 ’ B U F F T E C H F E N C E C H A I N L I N K F E N C E BUFFTECH FENCE TO BE 8’ HIGH AND PLACED ON STREET SIDE OF THE PROPERTY AND EXTENDED AROUND CORNER WITH SETBACK AS SHOWN. SETBACK TO STOUGHTON TO BE 35’-38’ FROM PROPERTY LINE AND TO AUDUBON ROAD TO BE 110’-15’ FROM PROPERTY LINE FLAT INFILTRATION TRAIL DIVERTED AROUND BERMS, TREES AND MANHOLE AS INDICATED. AU D U B O N R D EXISTING BITUMINUOUS PAVEMENT PROPOSED BITUMINUOUS ON COMPACTED UNDERLAYMENT PROPOSED BITUMINUOUS ON COMPACTED UNDERLAYMENT C O N C R E T E V A L L E Y G U T T E R FLAT INFILTRATION TRAIL DIVERTED AROUND BERMS, TREES AND MANHOLE AS INDICATED. INFILTRATION BASIN CU T E X I S T I N G B I T U M I N U O U S A N D M A T C H NE W B I T . T O E X I S T I N G A T C U T . 16’ CHAIN LINK GATE BUILDING 30 ’ SANSAN MH PP C L C L PUGPUGPUGPUGPUG GASGASGASGASGASGAS SANSANSANSAN SANSAN POH POHPOHPOH 10 0 10 20 6’ SIGHT LINE AT PROPERTY LINE MATURE TREES 8’ TREES AT PLANTING 8’ FENCE 10’-0” 30’ street pavement 10’-0” 5’-0/ 8’-0” EDGE OF PAVEMENT VARIES ga s es t i m a t e d 2 0 ’ ab o v e g r o u n d power above ground po w e r un d e r g r o u n d sa n se w e r 20’-0” 35’-0’ SECTION AT STOUGHTON AVENUE 35’-38’ PROPERTY LINE TO FENCE 1/8” = 1’-0” STOUGHTON AVENUEC L PROPERTY LINE PROPERTY LINE PROPERTY LINE PROPERTY LINE PP POHPOHPOHPOHPOHPOH PR O P E R T Y LIN E TRUCK SCALE AND CONCRETE TO BE REMOVED. STREETCL DA T E P H I L L I P D . J O H N S O N NO . 1 0 8 2 3 I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N OR R E P O R T W A S P R E P A R E D B Y M E O R U N D E R M Y DI R E C T S U P E R V I S I O N A N D T H A T I A M A D U L Y LI C E N S E D A R C H I T E C T U N D E R T H E L A W S O F T H E ST A T E O F M I N N E S O T A RI V E R V A L L E Y B U S I N E S S C E N T E R 21 0 0 S T O U G H T O N A V E N U E CH A N H A S S E N , M N JAN. 26, 2026 A3 STOUGHTON AVE PLANTING PLAN pr o p o s a l f o r : OU T D O O R S T O R A G E APROXIMATE TREE SPACING 19’40’56’71’49’47’9’ 1- 2 6 - ‘ 2 6 HACK B E R R Y HACK B E R R Y MAPL E - S U G A R M A P L E MAPL E , A U T U M N B L A Z E MAPL E , A U T U M N B L A Z E 3 - S E R V I C B E R R Y , LIND E N , A M E R I C A N S E N T R Y LIND E N , A M E R I C A N S E N T R Y LIND E N , L I T T L E L E A F LIND E N , L I T T L E L E A F LIND E N , L I T T L E L E A F 2 - M A P L E , MAPL E - S U G A R M A P L E 3 - S E R V I C B E R R Y , SHA D B L O W SHAD B L O W AMU R O R N A M E N T A L 3 - B A R B E R R Y , CONC O R D E S H R U B 2 - M A P L E , AMU R O R N A M E N T A L 3 - B A R B E R R Y , CONC O R D E S H R U B SER V I C B E R R Y , SHAD B L O W 3 - B A R B E R R Y , CONC O R D E S H R U B 2 - M A P L E , AMU R O R N A M E N T A L *** * * 3 - M A P L E , A M U R F L A M E S H R U B 2 - S E R V I C B E R R Y , SHAD B L O W 3 - S E R V I C B E R R Y , REGE N T S H R U B shadblow 181 A U D U B O N R O A D 8’ FENCE8’ FENCE 10 500 100 BUFFER ELEVATION 1”-20’-0” RIVER VALLEY OUTDOOR STORAGE 1” = 20’-0” 10 500 100 AUDUBON ROAD PLAN AUD U B O N R D 10 0 10 6’ SIGHT LINE AT PROPERTY LINE MATURE TREES 8’ TREES AT PLANTING 8’ FENCE 30’ street pavement SECTION AT AUDUBON AVENUE 10’-12’ PROPERTY LINE TO FENCE 1/8” = 1’-0” EDGE OF PAVEMENT VARIES ga s 20 wa t e r 10’-12’ 4 0 ’ B U F F T E C H F E N C E C H A I N L I N K F E N C E BUFFTECH FENCE TO BE 8’ HIGH AND PLACED ON STREET SIDES OF THE PROPERTY AND EXTENDED AROUND CORNER WITH SETBACK AS SHOWN. SETBACK TO STOUGHTON TO BE 35’-38’ FROM PROPERTY LINE AND TO AUDUBON ROAD TO BE 10’-15’ FROM PROPERTY LINE BOULEVARD SLOPED TO DIVERT PARKING LOT OVERFLOW TO INFILLTRATION BASIN. PROPOSED BITUMINUOUS ON COMPACTED UNDERLAYMENT PROPOSED BITUMINUOUS ON COMPACTED UNDERLAYMENT NORTH INFILTRATION BASIN INFILTRATION BASIN PROPERTY LINE PROPERTY LINE PROPERTY LINE PROPERTY LINE PROP E R T Y LINE PROPER T Y LINE P R O P E R T Y L I N E DA T E P H I L L I P D . J O H N S O N NO . 1 0 8 2 3 I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N OR R E P O R T W A S P R E P A R E D B Y M E O R U N D E R M Y DI R E C T S U P E R V I S I O N A N D T H A T I A M A D U L Y LI C E N S E D A R C H I T E C T U N D E R T H E L A W S O F T H E ST A T E O F M I N N E S O T A RI V E R V A L L E Y B U S I N E S S C E N T E R 21 0 0 S T O U G H T O N A V E N U E CH A N H A S S E N , M N JAN. 26, 2026 A2 AUDUBON RD PLANTING PLAN pr o p o s a l f o r : OU T D O O R S T O R A G E APROXIMATE TREE S P A C I N G 35’ 71’ 33’ 50’ APRO X I M A T E T R E E S P A C I N G 27’ 72’ 32’ 51’ 30’ 6’ 6’ 1- 2 6 - ‘ 2 6 6 - 9 x 1 6 - 1 0 SPRU C E , PINE , MAPL E , A U T U M N B L A Z E 3 - S E R V I C B E R R Y , REGE N T S H R U B 3 - M A P L E , A M U R F L A M E S H R U B LIND E N , L I T T L E L E A F 2 - B A R B E R R Y , C O N C O R D E S H R U B LIND E N , L I T T L E L E A F 4 - S E R V I C B E R R Y , R E G E N T S H R U B LIND E N , A M E R I C A N S E N T R Y 3 - R I V E R B I R C H MAPL E , A U T U M N B L A Z E 2- M A P L E , A M U R ORNA M E N T A L LIND E N , L I T T L E L E A F 2 - M A P L E , A M U R O R N A M E N T A L 3 - S E R V I C B E R R Y , REGE N T S H R U B 3 - M A P L E , A M U R F L A M E S H R U B MAPL E , N O R W A Y MAPL E , N O R W A Y 5 - B A R B E R R Y , C O N C O R D E S H R U B LIND E N , A M E R I C A N S E N T R Y 2 - S E R V I C B E R R Y , SHAD B L O W MAPL E , A M U R ORNA M E N T A L 2 - S E R V I C B E R R Y , SHAD B L O W MAPL E , A M U R ORNA M E N T A L 2 - B A R B E R R Y , C O N C O R D E S H R U B 2 - B A R B E R R Y , C O N C O R D E S H R U B 2 - M A P L E , A M U R F L A M E S H R U B 2 - S E R V I C B E R R Y , SHAD B L O W 2 - M A P L E , A M U R O R N A M E N T A L 2 - S E R V I C B E R R Y , SHAD B L O W * * * * BLA C K H I L L S NORW A Y* 12 ’ 13 ’ 182 PUG PUG POH POH POH POH POH POH POH POH X X X X E E E E E E E E E E E DS DS DSDS DS DS DS DS DS FFE=759.46 DS DS DS DS DS DS DS DS FFE=760.00 S ST E E E E S CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P CROP CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P CRO P FO FO FO GA S GA S GA S GA S GA S G A S GAS GAS POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH POH STO S T O S T O ST O W A T W A T WA T WA T WA T WA T WAT SAN SAN SAN SAN SAN SAN SAN SAN SAN RE=755.72 INV SW=752.07 RE=755.7 INV NE/NW=751.77 RE=755.62 INV NW=749.72 INV SE/SW UNABLE TO MEASURE RE=756.10 NO INVERTS RE=756.37 INV SW/NW=751.87 RE=75 6 . 7 4 INV S E = 7 5 3 . 3 4 RE=756.42 INV N/SE=751.62 INV E UNABLE TO MEASURE RE=756.48 INV W=752.58 RE=757.20 INV S=752.55 RE=757.90 INV NE=750.55 RE=757.30 INV N/W=750.90 RIM= 7 5 7 . 2 1 INV= 7 4 7 . 4 6 RIM=757.93 INV=748.58 WATER TOWER TRANSMISSION LINE TOWER TANKS ELEVATED WALKWAY BUILDING BUILDING ELEVATED WALKWAY TANKS BUILDING 756 756 757 757 757 757 757 757 758 758 758 758 758 758 759 759 759 759 759 755 755 755 755 760 760 760 754 754 756 756 756 756 757 757 757 757 758 758 758 758 759 759 759 759 757 757 757 757 758 75 9 757 757 757 75 7 758 758 7 5 9 7 5 9 759 7 5 8 759 756 757 758 756 757 758 759 759 75 9 759 7 5 8 7 5 9 757 758 756 757 758 759 758 7 5 7 75 9 75 8 757 758 4" PVC CULVERT INV=757.32 4" PVC CULVERT INV=756.80 RETAINING WALL L=2 7 0 . 5 7 R=1 4 9 4 . 6 5 Δ=1 0 ° 2 2 ' 1 9 " N51 ° 1 8 ' 5 1 " E 5 3 2 . 5 1 S88°52'27"E 304.49 S0 1 ° 2 1 ' 2 5 " W 1 8 3 . 9 8 S52 ° 4 4 ' 4 4 " W 4 3 1 . 3 5 S 3 4 ° 4 8 ' 1 2 " E 3 6 5 . 7 6 S0 1 ° 2 4 ' 0 0 " W 1 0 7 . 7 0 S55 ° 1 0 ' 3 1 " W 1 4 4 . 6 0 L=6 1 1 . 5 4 R=1 1 4 2 5 . 7 1 Δ=3 ° 0 4 ' 0 0 " S58° 1 4 ' 2 9 " W 6 5 9 . 5 0 L = 3 1 4 . 3 9 R = 4 2 0 . 0 0 Δ = 4 2 ° 5 3 ' 2 0 " N1 3 ° 0 8 ' 4 0 " E 1 4 3 . 0 7 L= 9 6 . 9 1 R= 5 0 5 . 0 0 Δ= 1 0 ° 5 9 ' 4 2 " 5.00 S88°01'42"E L = 2 1 2 . 2 5 R = 5 1 0 . 0 0 Δ = 2 3 ° 5 0 ' 4 3 " N51 ° 1 9 ' 3 0 " E 5 7 2 . 4 5 ELECTRIC CABINET ELECTRIC EASEMENT PER DOC NO. A432512 TRANSMISSION LINE EASEMENT PER DOC NO. A455245 AU D U B O N R O A D STA T E H I G W A Y N O . 2 1 2 STOU G H T O N A V E N U E AREA NOT SURVEYED AREA NOT SURVEYED 12 5 . 0 0 PAR C E L 1 PAR C E L 2 PAR C E L 3 5534304/27/21 . SHEET NUMBER: VERTICAL SCALE: DATE: PREPARED FOR: OF HORIZONTAL SCALE: DRAWN: CHECKED: DESIGNED: Phone (320) 253-9495 3701 12th Street North, Suite 206 Fax (320) 358-2001 St. Cloud, MN 56303 Toll Free (800) 270-9495 DATE:LICENSE NO. I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LAND SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA N: \ 0 0 3 1 7 7 6 . 0 0 \ D W G \ 0 0 3 1 7 7 6 - V - S U R V . D W G 1 Chanhassen, MN 04/27/21 . CRF ACW Buttenhoff Industrial Certificate of Survey 21000 State Highway 7 Excelsior, MN 55331 1Joel Buttenoff NOT FOR CONSTRUCTION Œ      : H V W Z R R G  3 U R I H V V L R Q D O  6 H U Y L F H V   , Q F  Common Ground Alliance Call 48 Hours before digging: 811 or call811.com 0'80'160'240' 1" = 80' 80' 16' or 8' PROJECT NUMBER: 0031776 LEGAL DESCRIPTION Parcel 1: That part of the Northwest Quarter of Section 3, Township 115, Range 23, Carver County, Minnesota, described as follows: Beginning at a point in the West line of said Section 3 distant 1795.7 feet due South of the Northwest corner thereof, said point being in the Southeasterly right of way line of the Minneapolis & St. Louis Railroad; thence running Northeasterly along said right of way line 997.8 feet; thence running due South parallel with the West line of said Section 3, 272.18 feet to a point in the centerline of the industry spur track, said point being the actual point of beginning of the tract of land to be described, said point also being in a curve having a radius of 694.69 feet, the radius point of said curve being South 46 degrees 57 minutes East, 694.69 feet from said actual point of beginning; thence running Northeasterly along the centerline of said industry spur track and along the arc of said curve to the right a distance of 89.72 feet to the end of said curve; thence running North 50 degrees 27 minutes East tangent to said curve and along the centerline of said industry spur track 1270.56 feet to the beginning of a curve to the left having a radius of 599.39 feet; thence running Northeasterly along the arc of said curve to the left and along the centerline of said industry spur track, a distance of 307.21 feet to the end of said curve; thence running North 21 degrees 05 minutes East tangent to said curve and along the centerline of said industry spur track, 151.69 feet to the beginning of a curve to the right having a radius of 532.18 feet; thence running Northeasterly along the arc of said curve to the right and along the centerline of said industry spur track 142.42 feet to its intersection with the Southeasterly right of way line of the Minneapolis & St. Louis Railroad, said point being 48.93 feet Southwesterly from the North line of said Section 3 as measured along said Southeasterly right of way line; thence running Northeasterly along said Southeasterly right of way line 48.93 feet to a point in the North line of said Section 3; thence running East along said North line 146.4 feet, more or less to the Northwest corner of the parcel of land conveyed to St. John's Evangelical Lutheran Church as recorded in Book 46 Deeds, Page 19, filed August 23, 1950; thence running South at right angles 593.85 feet; thence deflecting 53 degrees 47 minutes to the right and running Southwesterly parallel with the Northerly right of way line of the Chaska and Shakopee Road, 150 feet; thence deflecting 53 degrees 47 minutes to the left and running Southerly 175 feet to a point on the Northerly right of way line of the Chaska and Shakopee Road; thence running Southwesterly along said Northerly right of way line 1676.9 feet; more or less, to a point on a line drawn parallel with the West line of said Section 3 from the actual point of beginning; thence running North along said parallel line 367.62 feet, more or less, to the actual point of beginning. For the purpose of this description the West line of Section 3, Township 115, Range 23 is considered to be a due North and South line. Except that part lying West of the following described Line A: Commencing at a point on the West line of said Northwest Quarter distant 1655.37 feet Southerly from the Northwest corner thereof, said West line has an assumed bearing of South 0 degrees 33 minutes 32 seconds West, said point being on the Northerly line of the Chicago and North Western Railroad Company right of way; thence North 51 degrees 08 minutes 10 seconds East along said right of way line 1218.17 feet to the actual point of beginning of Line A to be described; thence South 23 degrees 43 minutes 37 seconds East 8.72 feet; thence Southerly 228.75 feet along a tangential curve concave to the West having a radius of 510.00 feet and a central angle of 25 degrees 41 minutes 55 seconds; thence North 88 degrees 01 minutes 42 seconds West and not tangent to said curve 5.00 feet; thence Southerly 96.91 feet along a non-tangential curve concave to the West having a radius of 505.00 feet and a central angle of 10 degrees 59 minutes 41 seconds and a chord bearing of South 07 degrees 28 minutes 09 seconds West; thence South 12 degrees 57 minutes 59 seconds West, tangent to last described curve, 143.07 feet; thence Southerly 330.26 feet along a tangential curve concave to the East having a radius of 420.00 and a central angle of 45 degrees 03 minutes 13 seconds, and there terminating. AND Excepting therefrom the following described tract: That part of the Northeast Quarter of the Northwest Quarter of Section 3, Township 115 North, Range 23 West of the 5th Principal Meridian, described as follows: Commencing at the Northwest corner of the Northwest Quarter of said Section 3; thence on an assumed bearing of South 88 degrees 52 minutes 27 seconds East along the North line of said Northwest Quarter a distance of 2286.69 feet; thence South 01 degree 21 minutes 25 seconds West a distance of 195.90 feet to the point of beginning of the land to be described; thence South 52 degrees 44 minutes 44 seconds West a distance of 412.15 feet; thence South 34 degrees 48 minutes 12 seconds East to the intersection with the Westerly line of the parcel conveyed to Northern States Power Company by the document filed in Book 61 of Deeds, Page 58, in the office of the Carver County recorder; thence Northerly along said Westerly line to the Northwesterly line of said conveyed parcel; thence Northeasterly along said Northwesterly line to the intersection with the Westerly line of the parcel conveyed to St. John's Evangelical Lutheran Church by the document filed in Book 46 of Deeds, Page 19, in the office of the Carver County Recorder; thence Northerly along said West line to the intersection with a line bearing North 52 degrees 44 minutes 44 seconds East from the point of beginning; thence South 52 degrees 44 minutes 44 seconds West to the point of beginning. Carver County, Minnesota Abstract Property Parcel 2: That part of the Northwest Quarter of Section 3, Township 115 North, Range 23 West, Carver County, Minnesota, described as follows: Beginning at a point in the West line of said Section 3 distant 1795.7 feet South of the Northwest corner thereof, said point being in the Southeasterly right-of-way line of the Chicago and Northwestern Railroad Company; thence running Northeasterly along said right-of-way line 997.8 feet to a point (which point is the Northwest corner of the tract previously conveyed to American Sugar-Company as described in Book 44 of Deeds, Page 8 thereof), which point is the true point of beginning of the tract conveyed; thence running South parallel with the West line of said Section 3, 272.18 feet to a point (which point is the Northwest corner of the tract previously conveyed to M.A. Gedney Company as described in Book 61 of Deeds, Page 251 thereof) in a curve having a radius of 694.69 feet, the radius point of said curve being South 46 degrees 57 minutes East 694.69 feet from said point; thence running Northeasterly along the Northwesterly line of the tract previously conveyed to M.A. Gedney Company as described in Book 61 of Deeds, Page 251 thereof and along the arc of said curve to the right a distance of 89.72 feet to the end of said curve; thence running North 50 degrees 27 minutes East tangent to said curve 1270.56 feet to the beginning of a curve to the left having a radius of 599.39 feet; thence running Northeasterly along the arc of said curve to the left a distance of 307.21 feet to the end of said curve; thence running North 21 degrees 05 minutes East tangent to said curve 151.69 feet to the beginning of a curve to the right having a radius of 532.18 feet; thence running Northeasterly along the arc of said curve to the right 142.42 feet to its intersection with the Southeasterly right-of-way line of Chicago and Northwestern Railway Company railroad, said point being 48.93 feet Southwesterly from the North line of said Section 3 as measured along said Southeasterly right-of-way line; thence running Southwesterly along said Southeasterly right-of-way line of Chicago and Northwestern Railway Company railroad to the point of beginning. Except that part lying West of the following described Line A: Commencing at a point on the West line of said Northwest Quarter distant 1655.37 feet Southerly from the Northwest corner thereof, said West line has an assumed bearing of South 0 degrees 33 minutes 32 seconds West, said point being on the Northerly line of the Chicago and North Western Railroad Company right of way; thence North 51 degrees 08 minutes 10 seconds East along said right of way line 1218.17 feet to the actual point of beginning of Line A to be described; thence South 23 degrees 43 minutes 37 seconds East 8.72 feet; thence Southerly 228.75 feet along a tangential curve concave to the West having a radius of 510.00 feet and a central angle of 25 degrees 41 minutes 55 seconds; thence North 88 degrees 01 minutes 42 seconds West and not tangent to said curve 5.00 feet; thence Southerly 96.91 feet along a non-tangential curve concave to the West having a radius of 505.00 feet and a central angle of 10 degrees 59 minutes 41 seconds and a chord bearing of South 07 degrees 28 minutes 09 seconds West; thence South 12 degrees 57 minutes 59 seconds West, tangent to last described curve, 143.07 feet; thence Southerly 330.2 feet along a tangential curve concave to the East having a radius of 420.00 feet and a central angle of 45 degrees 03 minutes 13 seconds and there terminating. Carver County, Minnesota Abstract Property Parcel 3: Outlot D, Crystal Addition, Files of the Registrar of Titles, Carver County, Minnesota. Torrens Property GUY WIRE FLARED END SECTION SANITARY MANHOLE CATCH BASIN ELECTRIC MANHOLE ELECTRIC TOWER POWER POLE ELECTRIC BOX ELECTRIC METER SIGN STREET LIGHT POWER OVERHEAD POWER UNDERGROUND WATERMAIN FIBER OPTIC SANITARY SEWER STORM SEWER GATE VALVE GAS LINE HYDRANT STORM MANHOLE LEGEND FENCE LINE CURB & GUTTER CONCRETE SURFACE BITUMINOUS SURFACE GRAVEL SURFACE FOUND MONUMENT (SEE LABEL) GAS POH PUG SAN STO WAT FO S ST E E E X EASEMENT LINE BOUNDARY LINE MAST ARM DOWNSPOUTDS 18 3 PH (952) 227-11 00 • ChanhassenMN.gov 7700 MARKET BOULEVARD • PO BOX 147 • CHANHASSEN • MINNESOTA • 55317 Project: Conditional Use Permit Request (Planning Case 2026-03) City Council Review Date: March 23, 2026 60 Day Action Deadline: March 31, 2026 Drafted By: Rachel Arsenault, Associate Planner Staff Report Date: March 18, 2026 SUMMARY OF REQUEST: Applicant is requesting a conditional use permit for screened outdoor storage at the property located at 2100 Stoughton Avenue. STAFF RECOMMENDATION: Staff recommends City Council approve the conditional use permit, subject to the conditions listed herein. LOCATION: 2100 Stoughton Avenue APPLICANT: Luke Buttenhoff OWNER: August Ventures LLC CURRENT ZONING: Industrial Office Park (IOP) 2040 LAND USE PLAN: Office Industrial ACREAGE: 21.21 Acres PROPOSED MOTIONS: “The Chanhassen City Council approves the condi>onal use permit for screened outdoor storage at 2100 Stoughton Avenue, subject to staff condi>ons.” 184 LEVEL OF CITY DISCRETION IN DECISION-MAKING: The city has limited discretion in approving or denying Conditional Use Permits, based on whether or not the proposal meets the conditional use permit standards outlined in the Zoning Ordinance. If the city finds that all the applicable conditional use permit standards are met, the permit must be approved. This is a quasi-judicial decision. No2ce of the public hearing was mailed to all property owners within 500 feet. A public hearing was held at the Planning Commission mee2ng on March 3, 2026. APPLICABLE REGULATION ARTICLE 20-IV CONDITIONAL USES ARTICLE 20-XXII "IOP" INDUSTRIAL OFFICE PARK DISTRICT ARTICLE 20-XXV LANDSCAPING AND TREE REMOVAL BACKGROUND/EXISTING CONDITIONS The property is currently home to an office-industrial-warehouse building that is ac>vely in use separate from this condi>onal use permit request. The west side of the property contains outdoor pickle vats that have occupied this space since roughly 1958 when the Gedney’s pickle factory started opera>ons. Recently, in 2020 there was a development applica>on for food processing and outdoor storage for six silos where the pickle vats are currently located. The City Council approved the development applica>on on July 27, 2020; however, the project was never constructed. ZONING OVERVIEW This property is zoned IOP, Industrial Office Park, in this zoning district screened outdoor storage is a condi>onal use permit. Screened outdoor storage condi>onal use permits must be completely screened with 100 percent opaque fence or landscaped screen. In addi>on, all condi>onal use permits must meet the general issuance standards listed in Sec>on 20-232, this is reviewed under the analysis sec>on of the staff report. SITE PLAN The applicant is proposing a screened outdoor storage area on the west side of the parcel, 3.73 acres in size. The area is proposed to be bituminous paving with guKers and stormwater collec>on. On the corner of Audubon Road and Stoughton Avenue there is a planned infiltra>on basin connec>ng into Chaska’s stormwater system. The second infiltra>on basin is located on the north-west corner of the storage area. The current fencing proposal does not meet the city requirements for 100% opaque fencing; the current proposal includes both 8-foot opaque white vinyl fence and chain link. This will need to be updated in the plan set to fully opaque fencing and is a listed condi>on of approval for this project. LANDSCAPING This project requires Buffer Yard C in landscaping requirements for the southern, western, and northern border of the screened outdoor storage area. Buffer Yard C is required between an office/industrial project and adjacent collector/arterial roads. County Road 61 is an arterial road, Audubon (County Road 15) is an arterial road, and Stoughton Avenue is a collector road. 185 ENGINEERING PROJECT OVERVIEW The applicant is reques>ng a Condi>onal Use Permit to allow screened outdoor storage at the property located at 2100 Stoughton Avenue. The proposal includes improvements to the site consis>ng of addi>onal pavement and new stormwater management features. Plans dated January 27, 2026, and a Stormwater Report dated February 9, 2026, both prepared by Civil Methods Inc., were reviewed by staff. ACCESS The project site is located in the southwest corner of Chanhassen. The project site is bordered on three sides (north, south, and west) by the City of Chaska. The City of Chaska owns and maintains Stoughton Avenue and Audubon Road adjacent to the site. Carver County owns and maintains Chaska Boulevard (County Road 10) and Flying Cloud Drive (County Road 61). Applicant is not proposing addi>onal entrances or exits on the property. Work proposed within or adjacent to these public rights-of-way will likely require permits from both the City of Chaska and Carver County. The applicant shall coordinate with all applicable agencies to confirm permiQng requirements. Proof that all required permits have been obtained shall be submiKed prior to issuance of building permits. GRADING & DRAINAGE The site consists of a single parcel that currently contains a building, bituminous pavement, and storage tanks, with the remaining areas in open grass. Under exis>ng condi>ons, the northern por>on of the site drains to the north and east, while the southern por>on drains to a storm sewer located at the southwest corner of the property within Stoughton Avenue. Under proposed condi>ons, the site will be mass graded to accommodate improved parking and outdoor storage areas. Overall drainage paKerns will remain generally consistent with exis>ng condi>ons. Two infiltra>on basin Best Management Prac>ces (BMPs) are proposed to treat runoff from the new impervious surfaces. Stormwater from the southern por>on of the site will be collected by a trench drain and conveyed to an infiltra>on basin located at the southwest corner of the property. Addi>onal runoff will enter the basin via sheet flow. This basin will discharge to the exis>ng storm sewer in Stoughton Avenue. Stormwater from the northern por>on of the site will drain to a second infiltra>on basin located at the northeast corner of the property, which will discharge to a ditch northeast of the basin. A small por>on of the site will con>nue to drain east without treatment. The proposed infiltra>on basins are designed to provide treatment for new impervious surfaces and to meet applicable discharge rate requirements. EROSION CONTROL The proposed development will exceed one (1) acre of disturbance and will, therefore, be subject to the General Permit Authoriza>on to Discharge Stormwater Associated with Construc>on Ac>vity Under the Na>onal Pollu>on Discharge Elimina>on/State Disposal System (NPDES Construc>on Permit). All erosion control shall be installed and inspected by city staff prior to ini>a>on of site grading ac>vi>es. The applicant has submiKed an erosion control plan and a Storm Water Pollu>on Preven>on Plan (SWPPP). No earth disturbing ac>vi>es may occur un>l an approved SWPPP is developed. This SWPPP shall be a standalone 186 document consistent with the NPDES Construc>on Permit and shall contain all required elements of the permit. The SWPPP will need to be updated as the plans are finalized when the contractor and their sub- contractors are iden>fied and as other condi>ons change. An approved SWPPP shall be submiKed prior to issuing building permits. All erosion control shall be installed and inspected prior to ini>a>on of site grading ac>vi>es. STORM WATER MANAGEMENT Ar>cle VII, Chapter 19 of the City Code establishes the required stormwater management development standards. Sec>on 19-141 states that these standards must be reflected in plans prepared by developers and project proposers in the design and layout of site plans, subdivisions, and water management features. The standards require abstrac>on of runoff and water quality treatment sufficient to achieve removal of 90 percent total suspended solids (TSS) and 60 percent total phosphorus (TP). The proposed project is located within the jurisdic>on of the Lower Minnesota River Watershed District and is therefore subject to its rules and regula>ons. A permit from the watershed district will be required prior to the issuance of building permits. A Stormwater Management Report has been submiKed for review to verify compliance with all applicable stormwater management requirements, including rate control, volume abstrac>on, and water quality treatment. All review comments from both the City and the watershed district must be addressed prior to approval. The proposed design u>lizes two infiltra>on basins to meet stormwater management requirements. Based on the submiKed informa>on, TP and TSS removal standards are being met through treated infiltra>on volume abstrac>on. Required freeboard is currently met for the adjacent on-site building. Addi>onally, the applicant submiKed calcula>ons and a suppor>ng narra>ve demonstra>ng that the proposed drainage design will not adversely impact adjacent proper>es. Both surface water runoff and poten>al groundwater interac>ons associated with the proposed infiltra>on basins were evaluated as part of this analysis. The applicant shall submit final versions of the stormwater modeling (HydroCAD) and the Stormwater Management Report addressing all outstanding comments and confirming compliance with rate control, volume abstrac>on, and water quality standards as part of final CUP approval. Stormwater discharged from the site is routed directly to right-of-way areas owned by the Chaska and Carver County. As a result, permits will likely be required from these agencies to verify that stormwater requirements are met and that the proposed design will not adversely impact downstream systems. The applicant shall provide proof of all required permits prior to issuance of building permits. All stormwater infrastructure on the site will be privately owned and maintained. The applicant shall prepare an Opera>on and Maintenance (O&M) Plan for the private stormwater infrastructure onsite. Maintenance of private stormwater systems is required in perpetuity. The O&M Plan must be approved by the Water Resources Engineer, or their designee, and recorded against the benefi>ng property. The stormwater O&M agreement shall be recorded prior to the issuance of building permits. ANALYSIS 187 The planning commission shall recommend a condi>onal use permit and the council shall issue such condi>onal use permits only if it finds that such use at the proposed loca>on: a) Will not be detrimental to or endanger the public health, safety, comfort, convenience, or general welfare of the neighborhood or the city. The screened outdoor storage will not be detrimental to or endanger public health, safety, comfort, convenience, or general welfare of the neighborhood or city. b) Will be consistent with the objec>ves of the city's comprehensive plan and this chapter. This proposal is consistent with the objec ves of the comprehensive plan and this chapter. c) Will be designed, constructed, operated, and maintained so to be compa>ble in appearance with the exis>ng or intended character of the general vicinity and will not change the essen>al character of that area. The proposal with the staff required condi ons will be compa ble in appearance with the intended character of the general vicinity and will not change the essen al character of that area. d) Will not be hazardous or disturbing to exis>ng or planned neighboring uses. The proposal will not be hazardous or disturbing to exis ng or planned neighboring uses. e) Will be served adequately by essen>al public facili>es and services, including streets, police and fire protec>on, drainage structures, refuse disposal, water and sewer systems, and schools; or will be served adequately by such facili>es and services provided by the persons or agencies responsible for the establishment of the proposed use. The proposed will be served by the city of Chaska for services, requiring a separate review and approval for the connec ons. f) Will not create excessive requirements for public facili>es and services and will not be detrimental to the economic welfare of the community. The proposal will not create excessive requirements for public facili es and services and will not be detrimental to the economic welfare of the community. g) Will not involve uses, ac>vi>es, processes, materials, equipment, and condi>ons of opera>on that will be detrimental to any persons, property, or the general welfare due to excessive produc>on of traffic, noise, smoke, fumes, glare, odors, rodents, or trash. The screened outdoor storage shall conform to these requirements. h) Will have vehicular approaches to the property which do not create traffic conges>on or interfere with traffic or surrounding public thoroughfares. The proposal will u lize exis ng property exits & entrances. i) Will not result in the destruc>on, loss or damage of solar access, natural, scenic or historic features of major significance. The proposal will not result in the destruc on, loss or damage of solar access, natural, scenic or historic features of major significance. j) Will be aesthe>cally compa>ble with the area. The proposed will be aesthe cally compa ble with the area. k) Will not depreciate surrounding property values. The proposed will not depreciate surrounding property value. 188 l) Will meet standards prescribed for certain uses as provided in this ar>cle. The proposed will meet standards prescribed for certain uses as provided in this ar cle. (Ord. No. 80, Art. III, § 2(3-2-3), 12-15-86; Ord. No. 377, § 23, 5-24-04) Outside Governmental Organiza2on Comments Lower Minnesota River Watershed District Review 1. This project requires Rule B, Erosion and Sediment Control permit. 2. This project requires Rule D, Stormwater Management permit. 3. Property Owner, or authorized agent shall submit an applica>on and relevant exhibits to the LMRWD prior to work commencing. City of Chaska 1. Developer may be required to install curb and guKer on the north side of Stoughton Avenue. 2. Connec>on to the Chaska stormwater system will require approval from the Chaska City Engineer. PLANNING COMMISSION RECOMMENDATION The Chanhassen Planning Commission recommended approval of the requested condi>onal use permit for outdoor storage at 2100 Stoughton Avenue subject to the condi>ons of the staff report. STAFF RECOMMENDATION Staff recommend approval of the requested condi>onal use permit for screened outdoor storage at 2100 Stoughton Avenue, subject to the condi>ons listed herein. Condi2onal Use Permit Condi2ons 1. Outdoor storage area shall be enclosed with 100% opaque fencing 8’ in height. Fencing shall be maintained in good condi>on at all >mes. 2. All materials and equipment stored outdoors shall not exceed the height of the required storage area fencing. 3. Outdoor storage area shall not be used as a Contractors Yard, as defined by the City of Chanhassen. 4. Materials and equipment placed within the outdoor storage area shall not emit odors, produce excessive noise, or be hazardous. 5. Any outdoor ligh>ng for the outdoor storage shall not exceed 25 feet in height when mounted to a light pole. Light measurement at the property line shall not exceed 0-foot candles. 6. All proposed tenants shall be approved administra>vely by the Community Development Director or their designee prior to leasing and occupying the screened area. If the screened outdoor storage changes tenants, the property manager shall receive approval for all subsequent tenants as well. 189 Staff Comments Requiring Plan Revisions Building 1. Fences 7’ and over require a building permit. 2. Retaining walls (if present) more than four feet high, measured from the boKom of the foo>ng to the top of the wall, must be designed by a professional engineer and a building permit must be obtained prior to construc>on. Retaining walls (if present) under four feet in height require a zoning permit. Planning 1. Chain link fencing is not permiKed, update all fencing to be 100% opaque fencing. Gates must also be fully opaque. Update notes throughout plan set to reflect city required fencing. 2. Applicant shall provide a breakdown of the current impervious lot coverage and the proposed addi>onal impervious lot coverage. Impervious lot coverage on this property shall meet the regula>ons for the Industrial Office Park (IOP) zoning district. Forestry 1. Plans shall be updated to meet the requirements for Buffer Yard C on the south, west, and north sides of the screened outdoor storage area which includes the area around the proposed stormwater pond. Applicant shall update the buffer yard calcula>ons on the plan set. 2. Plan>ng plan shall provide a breakdown of the species diversifica>on to verify the proposed meets city code requirements for species diversity. No more than 10% from same species, no more than 20% from same genus and no more than 30% from the same family. 3. Plan>ng schedule to include quan>ty, species (botanical name and common name), and size of replacement. Water Resources & Engineering 1. The applicant and their design Engineer shall work with City staff in amending the plans, dated January 27, 2026, prepared by Civil Methods Inc., to fully sa>sfy plan comments and concerns. Final construc>on plans will be subject to review and approval by staff. 2. It is the applicant’s responsibility to ensure that permits are received from all other applicable agencies with jurisdic>on over the project (i.e. Army Corps of Engineers, DNR, MnDOT, Carver County, LMRWD Watershed District, Board of Water and Soil Resources, MDH, MPCA, etc.). The applicant shall submit verifica>on that all applicable permits have been secured prior to the issuance of building permits. 3. The applicant shall provide final versions of hydrologic and hydraulic (H&H) and water quality modelling with the building permit submiKal. 4. The applicant shall develop a maintenance plan for the onsite stormwater system. An opera>ons and maintenance agreement shall be recorded prior to the issuance of building permits. 190 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA CONDITIONAL USE PERMIT #26-03 1. Permit. Subject to the terms and conditions set forth herein, the City of Chanhassen hereby grants a conditional use permit for screened outdoor storage at 2100 Stoughton Avenue. 2. Property. The permit for the property situated in the City of Chanhassen, Carver County, Minnesota, and legally described in Exhibit A. 3. Conditions. The permit is issued subject to the following conditions: 1. Outdoor storage area shall be enclosed with 100% opaque fencing 8’ in height. Fencing shall be maintained in good condition at all times. 2. All materials and equipment stored outdoors shall not exceed the height of the required storage area fencing. 3. Outdoor storage area shall not be used as a Contractors Yard, as defined by the City of Chanhassen. 4. Materials and equipment placed within the outdoor storage area shall not emit odors, produce excessive noise, or be hazardous. 5. Any outdoor lighting for the outdoor storage shall not exceed 25 feet in height when mounted to a light pole. Light measurement at the property line shall not exceed 0- foot candles. 6. All proposed tenants shall be approved administratively by the Community Development Director or their designee prior to leasing and occupying the screened area. If the screened outdoor storage changes tenants, the property manager shall receive approval for all subsequent tenants as well. 4. Termination of Permit. The City may revoke the permit following a public hearing for violation of the terms of this permit. 5. Lapse. If within one year of the issuance of this permit the authorized construction has not been substantially completed or the use commenced, this permit shall lapse, unless an extension is granted in accordance with the Chanhassen Zoning Ordinance. 6. Criminal Penalty. Violation of the terms of this conditional use permit is a criminal misdemeanor. 191 Dated: March 23, 2026 CITY OF CHANHASSEN BY: ___________________________ Elise Ryan, Mayor AND: ___________________________ Laurie Hokkanen, City Manager STATE OF MINNESOTA ) ( ss COUNTY OF CARVER ) The foregoing instrument was acknowledged before me this day of , 20___, by Elise Ryan, Mayor, and by Laurie Hokkanen, City Manager, of the City of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. __________________________________ NOTARY PUBLIC 192 Exhibit A 193 194 195 EXHIBIT B 196 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND DECISION IN RE: Application of Cornerstone Investors for a Conditional Use Permit (CUP). On March 3, 2026, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Cornerstone Investors for a screened outdoor storage conditional use permit. The Planning Commission conducted a public hearing on the proposed conditional use permit, preceded by published and mailed notice. FINDINGS OF FACT 1. Permit. On January 29, 2026, the city received a completed land use application for the property legally described in Exhibit A (“Property”), located at 2100 Stoughton Avenue requesting a conditional use permit for screened outdoor storage on the Property. 2. Property. The Property is currently zoned Industrial Office Park (IOP). The Property is guided by the 2040 Land Use Plan for Office Industrial Use. Screened outdoor storage is considered a Conditional Use within the Industrial Office Park (IOP) zoning district. 3. Conditions. The permit is issued subject to the following conditions: 1. Outdoor storage area shall be enclosed with 100% opaque fencing 8’ in height. Fencing shall be maintained in good condition at all times. 2. All materials and equipment stored outdoors shall not exceed the height of the required storage area fencing. 3. Outdoor storage area shall not be used as a Contractors Yard, as defined by the City of Chanhassen. 4. Materials and equipment placed within the outdoor storage area shall not emit odors, produce excessive noise, or be hazardous. 5. Any outdoor lighting for the outdoor storage shall not exceed 25 feet in height when mounted to a light pole. Light measurement at the property line shall not exceed 0-foot candles. 197 6. All proposed tenants shall be approved administratively by the Community Development Director or their designee prior to leasing and occupying the screened area. If the screened outdoor storage changes tenants, the property manager shall receive approval for all subsequent tenants as well. 4. Termination of Permit. The city may revoke the permit following a public hearing for violation of the terms of this permit. The city may institute any proper action or proceeding at law or at equity to prevent violations of the within property, to restrain or abate violations of the within permit, or to prevent use or occupancy of the Subject Property. 5. Lapse. If within one year of the issuance of this permit the authorized construction has not been substantially completed or the use commenced, this permit shall lapse, unless an extension is granted in accordance with the Chanhassen Zoning Ordinance. 6. Criminal Penalty. Violation of the terms of this conditional use permit is a criminal misdemeanor. DECISION The City Council approves the conditional use permit based on the findings of fact included herein, and subject to the conditions of the staff report. ADOPTED by the Chanhassen City Council this 23rd day of March, 2026. CHANHASSEN CITY COUNCIL BY:___________________________________ Its Mayor BY:_ __________________________________ Its City Manager 198 EXHIBIT A 199 200 201 EXHIBIT B 202 Planning Commission Minutes – March 3, 2026 2 2. Consider a Conditional Use Permit Request for Screened Outdoor Storage at 2100 Stoughton Avenue Community Development Director Eric Maass reviewed the conditional use permit request for screened outdoor storage at 2100 Stoughton Avenue. He noted that the city’s discretion in approving or denying a conditional use permit was based on whether or not the proposal met the conditional use permit standards. He stated that the property was zoned industrial office park and was just over 21 acres at the southwest corner of Chanhassen. He described the existing conditions, including the overhead power transmission towers with an easement, existing industrial buildings on site, the existing entrances and exits, and the pickle vats. He noted that the pickle vats would be removed if approved. He reviewed the proposed site plan, including the additional stormwater ponds. He described the landscaping plan and said that it was making progress. He stated that a buffer yard was required since the adjacent roads were collectors. He said that the planting schedule would require updates to meet the species diversification requirements. He summarized the grading plan. He noted that the City Code requires screened outdoor storage. He reviewed the outside agency comments from the Lower Minnesota River Watershed District and the City of Chaska. He noted that as long as the five proposed conditions were met, the conditional use permit would stay in place. He said that the applicant does not have a tenant lined up to use the outdoor storage. Commissioner Jobe asked if the sewer was hooked up on the Chaska side of the road and how it would work. Mr. Maass responded that they would hook up with the storm sewer with the City of Chaska, but if the City of Chanhassen would extend utilities, they would require the property owner to hook up to those utilities. Commissioner Trevena asked for clarification about a contractor yard versus other outdoor storage. Mr. Maass answered that contractor yards are their own category of conditional use permits, and since they did not have an identified user, contractor yards required additional oversight. He said if the property yard owner wanted to add a contractor to use it as a contractor yard, they could request a conditional use permit amendment. Commissioner Trevena asked about the process for the city to go through from an administrative standpoint when a tenant is identified. Mr. Maass responded that as long as a tenant could abide by the conditions in the conditional use, there would be no additional oversight. Chair Noyes invited the applicant up. Cole Buttenhoff, Outdoor Storage, provided an overview of the property. He said that this portion, being outdoor storage, was the last area that could be redeveloped after the last tenant vacated the property. Chair Noyes asked if he had a set of tenants he was focusing on while he marketed the property. Mr. Buttenhoff answered that they could market the outdoor storage with 40,000 square feet of 203 Planning Commission Minutes – March 3, 2026 3 space in the building. He stated the tenant was dependent on the market, and noted that the space available was primarily warehouse. Chair Noyes opened the public hearing. There were no public comments. Commissioner Soller asked if the 8-foot screening was in the City Code. Mr. Maass answered that screened outdoor storage up to 8 feet was a requirement. Chair Noyes closed the public hearing. Commissioner Trevena moved, Commissioner Jobe seconded that the Chanhassen Planning Commission recommends approval of the conditional use permit for screened outdoor storage at 2100 Stoughton Avenue, subject to staff conditions. All voted in favor, and the motion carried unanimously with a vote of 7 to 0. 3. Ordinance XXX: Amending Chapters 1 and 20, Updating Sign Definitions and Regulations Mr. Maass stated that the sign code had been in the community development workplan and it was a lengthy process. He noted that the proposed sign code would add opportunity for awning signs, projecting signs, and canopy signs. He provided an overview of the community engagement, including an email sent to businesses within the central business district on December 19 and a follow-up email sent on January 5. He said that a Microsoft Teams open house was held on January 9 between 9:00 a.m. and 11:00 a.m. He reviewed the feedback from community engagement and said that more signage options were appreciated. Businesses may choose not to purchase awnings or projecting signs because of the associated costs. He said that businesses shared that sign bands along buildings are a limiting factor as that is where signage is located. He summarized the sign code change proposal and said they wanted to right-size wall signs in the downtown area and prevent future outliers. He stated they also wanted to expand sign options within the downtown area while removing regulations specific to content because it was a First Amendment violation. They want to improve implementation and permitting for signage. He explained the existing wall area and the maximum percentage of wall area for signage downtown, and the proposed wall sign regulations. He stated that two signs would be impacted by the proposed signage regulations. He discussed the canopy signage and said a canopy sign, as shown, could not be installed in addition to a wall sign. Mr. Maass said that they wanted to allow temporary signs without a permit since they would still have enforcement if temporary signs became a nuisance. He stated that businesses approach window signs in different ways. He said that there were unique situations when there was a building reuse and liquor license requirements. He summarized the window sign implementation to update from an unclear percentage of window space to not exceeding six square feet per business occupant or owner. He requested feedback on this change and said they could change it to six square feet per window or an exception for window coverings required by city, state, or 204