2026-71.docx CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: September 28, 2026 RESOLUTION NO: 2026-71
MOTION BY: Kimber SECONDED BY: McDonald
A RESOLUTION ACCEPTING THE FEASIBILITY STUDY,
CONDUCTING A PUBLIC HEARING, AND AUTHORIZING
PREPARATION OF PLANS AND SPECIFICATIONS FOR THE
2027 CITY PAVEMENT REHABILITATION PROJECT NO. 27-01
WHEREAS, pursuant to resolution of the Council adopted April 27, 2026, a feasibility report
has been prepared by SEH with reference to the above-referenced project, and this report is being
received by the Council on September 28, 2026, and
WHEREAS, the feasibility report provides information regarding whether the proposed project
is necessary, cost-effective, and feasible; whether it should best be made as proposed or in connection
with some other improvement; the estimated cost of the improvement as recommended; and a
description of the methodology used to calculate individual assessments for affected parcels.
WHEREAS, on September 14, 2026, the City Council called for the public hearing to be held
on September 28, 2026, for the 2027 City Pavement Rehabilitation Project No. 27-01. The project
includes street, drainage, and utility system improvements along the following streets: Valley Ridge
Trail N, Valley Ridge Trail S, Valley Ridge Place, Valley View Place, Valley View Ct, Lake Susan
Hills Dr, West Lake Drive, West Lake Ct, Dove Ct, Drake Ct, W 86th St, Tigua Ln, Dakota Ave,
Cheyenne Ave, Dakota Cir, and Cheyenne Spur, included in the 2027 City Pavement Rehabilitation
Project No. 27-01, and
WHEREAS, a minimum of ten (10) days’ mailed noticed and two (2) weeks’ published notice
of the Public Hearing was given; and
WHEREAS, the public hearing was held thereon the 28th day of September, 2026, in the
Council Chambers at Chanhassen City Hall, 7700 Market Boulevard, at which all persons desiring to be
heard were given an opportunity to be heard thereon,
NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council:
1. The Council received and accepted the feasibility study on September 28, 2026, and considered
the improvements of such project in accordance with the report and the assessment of abutting
properties for a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter
429.
2. Such improvement is necessary, cost-effective, and feasible as detailed in the project’s
Feasibility Study.
3. Such improvement is hereby ordered as proposed in the Council resolution adopted September
28, 2026.
Docusign Envelope ID: 9F700A77-346C-8FFA-82DF-C79D62ED0AA3
4. The Council authorizes preparation of plans and specifications for the 2027 City Pavement
Rehabilitation Project No. 27-01.
5. The Council declares its official intent to reimburse itself for the costs of the improvement from
the proceeds of tax exempt bonds.
PASSED AND ADOPTED by the Chanhassen City Council this 28th day of September, 2026.
ATTEST:
Jenny Potter, City Clerk Elise Ryan, Mayor
YES NO ABSENT
Ryan von Oven
Schubert
Kimber
McDonald
Docusign Envelope ID: 9F700A77-346C-8FFA-82DF-C79D62ED0AA3