Loading...
2026-68.docx1 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: September 14, 2026 RESOLUTION NO: 2026-68 MOTION BY: Schubert SECONDED BY: von Oven A RESOLUTION ACCEPTING THE FEASIBILITY STUDY, CONDUCTING A PUBLIC HEARING, AND AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE 2027 LAKE RILEY BLVD RECONSTRUCTION PROJECT NO. 27-02 WHEREAS, pursuant to resolution of the Council adopted April 27, 2026, a feasibility report has been prepared by Bolton & Menk with reference to the above-referenced project, and this report is being received by the Council on September 14, 2026, and WHEREAS, the feasibility report provides information regarding whether the proposed project is necessary, cost-effective, and feasible; whether it should best be made as proposed or in connection with some other improvement; the estimated cost of the improvement as recommended; and a description of the methodology used to calculate individual assessments for affected parcels. WHEREAS, on August 31, 2025, the City Council called for the public hearing to be held on September 14, 2026, for the 2027 Lake Riley Blvd Reconstruction Project No. 27-02. The project includes street, drainage, and utility system improvements along Lake Riley Blvd. It does not include improvements to Deerfoot Trl which is a private street, and WHEREAS, a minimum of ten (10) days’ mailed noticed and two (2) weeks’ published notice of the Public Hearing was given; and WHEREAS, the public hearing was held thereon the 14th day of September, 2026, in the Council Chambers at Chanhassen City Hall, 7700 Market Boulevard, at which all persons desiring to be heard were given an opportunity to be heard thereon, NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The Council received and accepted the feasibility study on September 14, 2026, and considered the improvements of such project in accordance with the report and the assessment of abutting properties for a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter 429. 2. Such improvement is necessary, cost-effective, and feasible as detailed in the project’s Feasibility Study. 3. Such improvement is hereby ordered as proposed in the Council resolution adopted April 27, 2026. 4. The Council authorizes preparation of plans and specifications for the 2027 Lake Riley Reconstruction Project No. 27-02. Docusign Envelope ID: 807CED0F-5BE6-8F15-80C6-EE5FD30AE8FA 2 5. The Council declares its official intent to reimburse itself for the costs of the improvement from the proceeds of tax exempt bonds. PASSED AND ADOPTED by the Chanhassen City Council this 14th day of September, 2026. ATTEST: Jenny Potter, City Clerk Elise Ryan, Mayor YES NO ABSENT Ryan von Oven Schubert Kimber McDonald Docusign Envelope ID: 807CED0F-5BE6-8F15-80C6-EE5FD30AE8FA