08-10-2026 CC WSCity Council Work Session Minutes – August 10, 2026 1 CHANHASSEN CITY COUNCIL WORK SESSION MINUTES August 10, 2026 Mayor Ryan called the work session to order at 5:30 P.M. COUNCIL MEMBERS PRESENT: Mayor Ryan, Councilmember McDonald, Councilmember Kimber, Councilmember von Oven COUNCIL MEMBERS ABSENT: Councilmember Schubert STAFF PRESENT: Laurie Hokkanen, City Manager; Charlie Howley, Public Works Director/City Engineer; Eric Maass, Community Development Director; Patrick Gavin, Communications Manager; Jerry Ruegemer, Park & Recreation Director PUBLIC PRESENT: Daniel Trifonov; Leo Allen; Diya Natarajan; Interview Youth Applicants for Park & Recreation and Environmental Commissions The City Council interviewed three youth applicants for vacancies on the Park and Recreation Commission and Environmental Commission. Daniel Trifonov and Leo Allen applied for the Park and Recreation Commission, while Diya Natarajan applied for consideration on either commission. North Lotus Lake Park Water Quality Improvement Project The City Council received an update on the Riley Purgatory Bluff Creek Watershed District’s proposed North Lotus Lake Park Water Quality Improvement Project. The project has advanced from the conceptual plan presented in October 2025 to approximately 30% design, with the watershed district now working toward 60% design. Current plans continue to envision a series of tiered stormwater treatment areas, reconstructed trails, open space, interpretive features and a potential natural-surface trail and boardwalk providing greater connection to Lotus Lake. The regional project is intended to improve stormwater treatment while also creating opportunities for residents to interact with the park and learn more about water quality and natural resources. The City Council also discussed how the project will coordinate with the city’s more immediate stormwater needs related to the Fox Hollow reconstruction project. Because the watershed district project is not expected to be constructed until 2028 at the earliest, the city plans to construct an interim drainage system consisting primarily of grading an open channel and a series of ditch checks designed to slow and treat runoff before it reaches Lotus Lake. Charlie Howley, Public Works Director/City Engineer said the interim work will have relatively little effect on existing park uses and can be easily incorporated into the larger watershed district project when that project takes shape. Mr. Howley also noted that changes to the Pleasant View Road project mean the city no longer anticipates needing the additional stormwater treatment originally envisioned for that project. City Council Work Session Minutes – August 10, 2026 2 The likelihood of the watershed district abandoning the project is very low, and it remains a featured project in the district’s three-year plan; engineering work is underway and a draft agreement with the city has already been prepared. The project is expected to return to a future City Council work session when the 60% design is available. No formal Council action was taken. Stormwater Pond Maintenance Review The City Council reviewed the city’s stormwater pond maintenance program and progress made since the program was established in 2020. The city manages approximately 300 publicly owned stormwater ponds, which collect runoff, reduce flood risk and help remove sediment and pollutants before water reaches lakes, wetlands and other natural resources. The city is required to inspect and maintain its stormwater infrastructure under its state-regulated MS4 permit, and staff uses a data-based system to evaluate pond condition and treatment performance and prioritize future maintenance. Charlie Howley, Public Works Director/City Engineer, reported that the program has resulted in substantial progress over the past six years. Thirty ponds have received maintenance projects, with another 10 addressed internally by Public Works staff, and completed projects have removed approximately 51,000 tons, or 34,000 cubic yards, of accumulated material, roughly equivalent to 3,000 truckloads. City Staff estimated the restored pond capacity results in approximately 76 pounds of phosphorus being removed from stormwater runoff each year and noted that rehabilitated ponds have seen an average 10-point improvement in their overall condition scores. It was emphasized that maintaining existing ponds is significantly more cost-effective than constructing new treatment infrastructure, estimating pond maintenance at approximately $520 per pound of phosphorus removed compared with $1,000 to $5,000 per pound for new infrastructure. Looking ahead, City Staff recommends continuing to fund the annual program at its current level while shifting more pond cleanout work to standalone winter projects rather than including it with street reconstruction projects. Winter projects have attracted more contractors and more competitive pricing, while bundling pond work with street projects has not produced the cost savings originally anticipated. City Council members expressed support for continuing the program, citing the value of having a consistent, funded process for maintaining the city’s stormwater infrastructure and responding to resident questions about pond conditions. The 2026 program carries a budget of approximately $536,000 through the Stormwater Enterprise Fund. No formal Council action was taken. Mayor Ryan adjourned the work session at 6:55 P.M. Submitted by Laurie Hokkanen City Manager Prepared by Jenny Potter City Clerk City Council Work Session Minutes – August 10, 2026 3