Loading...
03-23-2025 CC WSCity Council Work Session Minutes – March 23, 2026 1 CHANHASSEN CITY COUNCIL WORK SESSION MINUTES March 23, 2026 Acting Mayor Kimber called the work session to order at 5:30 p.m. COUNCIL MEMBERS PRESENT: Councilmember McDonald, Councilmember von Oven, Councilmember Kimber, Councilmember Schubert COUNCIL MEMBERS ABSENT: Mayor Ryan STAFF PRESENT: Laurie Hokkanen, City Manager; Charlie Howley, Public Works Director/City Engineer; Patrick Gavin, Communications Manager; Eric Maass, Community Development Director; Jerry Ruegemer, Parks Director; Kelly Grinnell, Finance Director; Jenny Potter, City Clerk PUBLIC PRESENT: Keving Green, Thielen & Green; Amanda Preisler, Thielen & Green; Bill Katter, Hempel; Rick McKelvey, Hempel; Sonja Dusil, Hempel; Josh McKinney, Measusure Environmental Commission Interviews The City Council conducted interviews for applicants seeking appointment to the Environmental Commission. Avienda Update Eric Maass, Community Development Director, introduced a group from Thielen & Green Architects, Hempel Real Estate, and Measure Civil Engineering to provide a proposed revised sketch site plan for the retail portion of the Avienda Development. The revised concept centers around a traditional retail layout anchored by a grocery store, along with a mix of retail, restaurant, and service uses. The site is organized into three general areas: a northern retail zone, a central “entertainment zone” built around a pond and public gathering space, and a southern area focused on quick-stop retail and drive-through uses. The central area is designed to serve as a focal point, with walking paths, boardwalk elements, and flexible plaza space intended for events and everyday use. A significant portion of the discussion focused on stormwater management challenges. The development team identified a substantial shortfall in required stormwater capacity, requiring a larger pond system and additional green space to manage runoff from both the site and surrounding properties. Councilmembers asked questions about the scale of the issue and raised questions about feasibility, parking layout, and how these constraints may shape the overall design. Councilmembers also noted the proposed location of a carwash and questioned if that was an appropriate location within Avienda for a car wash due to the large amount of space it occupied as well as whether or not a car wash was appropriate for Avienda. City Council Work Session Minutes – March 23, 2026 2 The development team plans to refine the proposal and submit a formal application in early April. Acting Mayor Kimber recessed the work session at 6:54 P.M. Acting Mayor Kimber reconvened the work session at 7:56 P.M. Lake Ann Park Preserve – Next Steps Jerry Ruegemer, Parks Director, discussed next steps for the Lake Ann Park Preserve, focusing on the southwest trail corridor between boardwalks A and B. This discussion followed a February 24 meeting of the Park and Recreation Commission, where commissioners reviewed the project and provided input on how the corridor should move forward. Mr. Ruegemer outlined several options that had been evaluated, including pursuing a Phase III analysis to attempt to build through the identified archaeological site, adjusting the trail alignment, or paving up to the site and leaving a gap. Each option presented challenges, particularly related to cost, long-term maintenance, and uncertainty around gaining approval. Cost estimates for additional study and analysis ranged widely, and there is no guarantee that further investment would result in an approved trail connection. The Park and Recreation Commission ultimately recommended delaying construction of the southern trail segment and leaving the existing natural trail in place. Commissioners expressed a preference to avoid additional spending on Phase III analysis, supported maintaining a mix of paved and natural trails, and emphasized the importance of continuing progress on completed portions of the project, including the northern trail and parking improvements. The City Council discussion reflected similar themes, including concern about continuing to invest in an uncertain approval process. Members also discussed potential alternative uses for remaining project funds, such as wayfinding signage, natural play features, or other park improvements. Staff noted that the natural trail would remain as it exists in its current state today but would not be maintained in the winter. Overall, the City Council indicated support for pausing further investment in the southern segment at this time, while leaving open the possibility of revisiting the connection in the future as conditions change. The northern trail segment and Greenwood Shores parking lot remain on track for completion this fall. Acting Mayor Kimber adjourned the work session at 8:31 P.M. Submitted by Laurie Hokkanen City Manager Prepared by Jenny Potter City Clerk