SUMMARY OF REQUEST:
Applicant is requesting a conditional use permit for screened outdoor storage at the property
located at 2100 Stoughton Avenue.
STAFF RECOMMENDATION:
Staff recommends Planning Commission recommend approval of the conditional use permit,
subject to the conditions listed herein.
LOCATION: 2100 Stoughton Avenue
APPLICANT: Luke Buttenhoff
OWNER: August Ventures LLC
CURRENT ZONING: Industrial Office Park (IOP)
2040 LAND USE PLAN: Office Industrial
ACREAGE: 21.21 Acres
PROPOSED MOTIONS:
“The Chanhassen Planning Commission recommends approval of the conditional use permit for
screened outdoor storage at 2100 Stoughton Avenue, subject to staff conditions.”
LEVEL OF CITY DISCRETION IN DECISION-MAKING:
The city has limited discretion in approving or denying Conditional Use Permits, based on whether or not the
proposal meets the conditional use permit standards outlined in the Zoning Ordinance. If the city finds that all
the applicable conditional use permit standards are met, the permit must be approved. This is a quasi -judicial
decision.
Notice of this public hearing has been mailed to all property owners within 500 feet.
APPLICABLE REGULATION
ARTICLE 20-IV CONDITIONAL USES
ARTICLE 20-XXII "IOP" INDUSTRIAL OFFICE PARK DISTRICT
ARTICLE 20-XXV LANDSCAPING AND TREE REMOVAL
BACKGROUND/EXISTING CONDITIONS
The property is currently home to an office-industrial-warehouse building that is actively in use separate from
this conditional use permit request. The west side of the property contains outdoor pickle vats that have
occupied this space since roughly 1958 when the Gedney’s pickle factory started operations.
Recently, in 2020 there was a development application for food processing and outdoor storage for six silos
where the pickle vats are currently located. The City Council approved the development application on July 27,
2020; however, the project was never constructed.
ZONING OVERVIEW
This property is zoned IOP, Industrial Office Park, in this zoning district screened outdoor storage is a
conditional use permit. Screened outdoor storage conditional use permits must be completely screened with
100 percent opaque fence or landscaped screen. In addition, all conditional use permits must meet the general
issuance standards listed in Section 20-232, this is reviewed under the analysis section of the staff report.
SITE PLAN
The applicant is proposing a screened outdoor storage area on the west side of the parcel, 3.73 acres in size.
The area is proposed to be bituminous paving with gutters and stormwater collection. On the corner of
Audubon Road and Stoughton Avenue there is a planned infiltration basin connecting into Chaska’s stormwater
system. The second infiltration basin is located on the north-west corner of the storage area. The current
fencing proposal does not meet the city requirements for 100% opaque fencing; the current proposal includes
both 8-foot opaque white vinyl fence and chain link. This will need to be updated in the plan set to fully
opaque fencing and is a listed condition of approval for this project.
LANDSCAPING
This project requires Buffer Yard C in landscaping requirements for the southern, western, and northern border
of the screened outdoor storage area. Buffer Yard C is required between an office/industrial project and
adjacent collector/arterial roads. County Road 61 is an arterial road, Audubon (County Road 15) is an arterial
road, and Stoughton Avenue is a collector road.
ENGINEERING PROJECT OVERVIEW
The applicant is requesting a Conditional Use Permit to allow screened outdoor storage at the property located
at 2100 Stoughton Avenue. The proposal includes improvements to the site consisting of additional pavement
and new stormwater management features. Plans dated January 27, 2026, and a Stormwater Report dated
February 9, 2026, both prepared by Civil Methods Inc., were reviewed by staff.
ACCESS
The project site is located in the southwest corner of Chanhassen. The project site is bordered on three sides
(north, south, and west) by the City of Chaska. The City of Chaska owns and maintains Stoughton Avenue and
Audubon Road adjacent to the site. Carver County owns and maintains Chaska Boulevard (County Road 10)
and Flying Cloud Drive (County Road 61). Applicant is not proposing additional entrances or exits on the
property. Work proposed within or adjacent to these public rights-of-way will likely require permits from both
the City of Chaska and Carver County. The applicant shall coordinate with all applicable agencies to confirm
permitting requirements. Proof that all required permits have been obtained shall be submitted prior to
issuance of building permits.
GRADING & DRAINAGE
The site consists of a single parcel that currently contains a building, bituminous pavement, and storage tanks,
with the remaining areas in open grass. Under existing conditions, the northern portion of the site drains to
the north and east, while the southern portion drains to a storm sewer located at the southwest corner of the
property within Stoughton Avenue.
Under proposed conditions, the site will be mass graded to accommodate improved parking and outdoor
storage areas. Overall drainage patterns will remain generally consistent with existing conditions. Two
infiltration basin Best Management Practices (BMPs) are proposed to treat runoff from the new impervious
surfaces. Stormwater from the southern portion of the site will be collected by a trench drain and conveyed to
an infiltration basin located at the southwest corner of the property. Additional runoff wil l enter the basin via
sheet flow. This basin will discharge to the existing storm sewer in Stoughton Avenue. Stormwater from the
northern portion of the site will drain to a second infiltration basin located at the northeast corner of the
property, which will discharge to a ditch northeast of the basin. A small portion of the site will continue to
drain east without treatment. The proposed infiltration basins are designed to provide treatment for new
impervious surfaces and to meet applicable discharge rate requirements.
EROSION CONTROL
The proposed development will exceed one (1) acre of disturbance and will, therefore, be subject to the
General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the
National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit). All erosion
control shall be installed and inspected by city staff prior to initiation of site grading activities. The applicant
has submitted an erosion control plan and a Storm Water Pollution Prevention Plan (SWPPP). No earth
disturbing activities may occur until an approved SWPPP is developed. This SWPPP shall be a standalone
document consistent with the NPDES Construction Permit and shall contain all required elements of the
permit. The SWPPP will need to be updated as the plans are finalized when the contractor and their sub-
contractors are identified and as other conditions change. An approved SWPPP shall be submitted prior to
issuing building permits. All erosion control shall be installed and inspected prior to initiation of site grading
activities.
STORM WATER MANAGEMENT
Article VII, Chapter 19 of the City Code establishes the required stormwater management development
standards. Section 19-141 states that these standards must be reflected in plans prepared by developers and
project proposers in the design and layout of site plans, subdivisions, and water management features. The
standards require abstraction of runoff and water quality treatment sufficient to achieve removal of 90 percent
total suspended solids (TSS) and 60 percent total phosphorus (TP).
The proposed project is located within the jurisdiction of the Lower Minnesota River Watershed District and is
therefore subject to its rules and regulations. A permit from the watershed district will be required prior to the
issuance of building permits. A Stormwater Management Report has been submitted for review to verify
compliance with all applicable stormwater management requirements, including rate control, volume
abstraction, and water quality treatment. All review comments from both the City and th e watershed district
must be addressed prior to approval.
The proposed design utilizes two infiltration basins to meet stormwater management requirements. Based on
the submitted information, TP and TSS removal standards are being met through treated infiltration volume
abstraction. Required freeboard is currently met for the adjacent on-site building. Additionally, the applicant
submitted calculations and a supporting narrative demonstrating that the proposed drainage design will not
adversely impact adjacent properties. Both surface water runoff and potential groundwater interactions
associated with the proposed infiltration basins were evaluated as part of this analysis. The applicant shall
submit final versions of the stormwater modeling (HydroCAD) and the Stormwater Management Report
addressing all outstanding comments and confirming compliance with rate control, volume abstraction, and
water quality standards as part of final CUP approval.
Stormwater discharged from the site is routed directly to right-of-way areas owned by the Chaska and Carver
County. As a result, permits will likely be required from these agencies to verify that stormwater requirements
are met and that the proposed design will not adversely impact downstream systems. The applicant shall
provide proof of all required permits prior to issuance of building permits.
All stormwater infrastructure on the site will be privately owned and maintained. The applicant shall prepare
an Operation and Maintenance (O&M) Plan for the private stormwater infrastructure onsite. Maintenance of
private stormwater systems is required in perpetuity. The O&M Plan must be approved by the Water Resources
Engineer, or their designee, and recorded against the benefiting property. The stormwater O&M agreement
shall be recorded prior to the issuance of building permits.
ANALYSIS
The planning commission shall recommend a conditional use permit and the council shall issue such
conditional use permits only if it finds that such use at the proposed location:
a) Will not be detrimental to or endanger the public health, safety, comfort, convenience, or general
welfare of the neighborhood or the city.
The screened outdoor storage will not be detrimental to or endanger public health, safety, comfort,
convenience, or general welfare of the neighborhood or city.
b) Will be consistent with the objectives of the city's comprehensive plan and this chapter.
This proposal is consistent with the objectives of the comprehensive plan and this chapter.
c) Will be designed, constructed, operated, and maintained so to be compatible in appearance with the
existing or intended character of the general vicinity and will not change the essential character of that
area.
The proposal with the staff required conditions will be compatible in appearance with the intended
character of the general vicinity and will not change the essential character of that area.
d) Will not be hazardous or disturbing to existing or planned neighboring uses.
The proposal will not be hazardous or disturbing to existing or planned neighboring uses.
e) Will be served adequately by essential public facilities and services, including streets, police and fire
protection, drainage structures, refuse disposal, water and sewer systems, and schools; or will be
served adequately by such facilities and services provided by the persons or agencies responsible for
the establishment of the proposed use.
The proposed will be served by the city of Chaska for services, requiring a separate review and approval
for the connections.
f) Will not create excessive requirements for public facilities and services and will not be detrimental to
the economic welfare of the community.
The proposal will not create excessive requirements for public facilities and services and will not be
detrimental to the economic welfare of the community.
g) Will not involve uses, activities, processes, materials, equipment, and conditions of operation that will
be detrimental to any persons, property, or the general welfare due to excessive production of traffic,
noise, smoke, fumes, glare, odors, rodents, or trash.
The screened outdoor storage shall conform to these requirements.
h) Will have vehicular approaches to the property which do not create traffic congestion or interfere with
traffic or surrounding public thoroughfares.
The proposal will utilize existing property exits & entrances.
i) Will not result in the destruction, loss or damage of solar access, natural, scenic or historic features of
major significance.
The proposal will not result in the destruction, loss or damage of solar access, natural, scenic or historic
features of major significance.
j) Will be aesthetically compatible with the area.
The proposed will be aesthetically compatible with the area.
k) Will not depreciate surrounding property values.
The proposed will not depreciate surrounding property value.
l) Will meet standards prescribed for certain uses as provided in this article.
The proposed will meet standards prescribed for certain uses as provided in this article.
(Ord. No. 80, Art. III, § 2(3-2-3), 12-15-86; Ord. No. 377, § 23, 5-24-04)
Outside Governmental Organization Comments
Lower Minnesota River Watershed District Review
1. This project requires Rule B, Erosion and Sediment Control permit.
2. This project requires Rule D, Stormwater Management permit.
3. Property Owner, or authorized agent shall submit an application and relevant exhibits to the LMRWD
prior to work commencing.
City of Chaska
1. Developer may be required to install curb and gutter on the north side of Stoughton Avenue.
2. Connection to the Chaska stormwater system will require approval from the Chaska City Engineer.
STAFF RECOMMENDATION
Staff recommend approval of the requested conditional use permit for screened outdoor storage at 2100
Stoughton Avenue, subject to the conditions listed herein.
Conditional Use Permit Conditions
1. Outdoor storage area shall be enclosed with 100% opaque fencing 8’ in height. Fencing shall be
maintained in good condition at all times.
2. All materials and equipment stored outdoors shall not exceed the height of the required storage area
fencing.
3. Outdoor storage area shall not be used as a Contractors Yard, as defined by the City of Chanhassen.
4. Materials and equipment placed within the outdoor storage area shall not emit odors, produce
excessive noise, or be hazardous.
5. Any outdoor lighting for the outdoor storage shall not exceed 25 feet in height when mounted to a light
pole. Light measurement at the property line shall not exceed 0-foot candles.
Staff Comments Requiring Plan Revisions
Building
1. Fences 7’ and over require a building permit.
2. Retaining walls (if present) more than four feet high, measured from the bottom of the footing to the
top of the wall, must be designed by a professional engineer and a building permit must be obtained
prior to construction. Retaining walls (if present) under four feet in height require a zoning permit.
Planning
1. Chain link fencing is not permitted, update all fencing to be 100% opaque fencing. Gates must also be
fully opaque. Update notes throughout plan set to reflect city required fencing.
2. Applicant shall provide a breakdown of the current impervious lot coverage and the proposed
additional impervious lot coverage. Impervious lot coverage on this property shall meet the
regulations for the Industrial Office Park (IOP) zoning district.
Forestry
1. Plans shall be updated to meet the requirements for Buffer Yard C on the south, west, and north sides
of the screened outdoor storage area which includes the area around the proposed stormwater pond.
Applicant shall update the buffer yard calculations on the plan set.
2. Planting plan shall provide a breakdown of the species diversification to verify the proposed meets city
code requirements for species diversity. No more than 10% from same species, no more than 20%
from same genus and no more than 30% from the same family.
3. Planting schedule to include quantity, species (botanical name and common name), and size of
replacement.
Water Resources & Engineering
1. The applicant and their design Engineer shall work with City staff in amending the plans, dated January
27, 2026, prepared by Civil Methods Inc., to fully satisfy plan comments and concerns. Final
construction plans will be subject to review and approval by staff.
2. It is the applicant’s responsibility to ensure that permits are received from all other applicable agencies
with jurisdiction over the project (i.e. Army Corps of Engineers, DNR, MnDOT, Carver County, LMRWD
Watershed District, Board of Water and Soil Resources, MDH, MPCA, etc.). The applicant shall submit
verification that all applicable permits have been secured prior to the issuance of building permits.
3. The applicant shall provide final versions of hydrologic and hydraulic (H&H) and water quality modelling
with the building permit submittal.
4. The applicant shall develop a maintenance plan for the onsite stormwater system. An operations and
maintenance agreement shall be recorded prior to the issuance of building permits.