2026-02-27_240743_Stormwater Report MMW STORMWATER MANAGEMENT NARRATIVE PREPARED FOR: Gym, Stage, and Science Addition and Alterations Minnetonka Middle School Minnetonka Public Schools District 276 6421 Hazeltine Blvd Excelsior, MN 55331 February 13, 2026 Revised February 27, 2026 Prepared by: 2300 Berkshire Lane North, Suite 200 Plymouth, MN 55441 Table of Contents Summary Stormwater Summary Appendix A Rainfall Analysis Data Appendix B Water Quality Volume Calculations Appendix C Drainage Maps - Existing Drainage Map - Proposed Drainage Map Appendix D Existing vs Proposed Site Areas Appendix E Existing vs Proposed Rate and Volume Summaries Appendix F MIDS Diagram and Calculation Summary Stormwater Summary The Minnetonka Middle School West Gym, Stage, and Science Addition Project in Excelsior, MN is located at 6421 Hazeltine Blvd. This project consists of replacing an existing grass sports field with a synthetic turf field, relocating the existing running track, and constructing a new gym and science addition. A HydroCAD stormwater model is being developed to estimate peak runoff rates and volumes for the existing and proposed drainage conditions. The SCS Curve Number Method was used with rainfall distribution of a Type II 24-hour storm. The hydrographs were based on the updated NOAA Atlas 14 data for the area. This rainfall data is shown in Appendix A. Curve Numbers were determined from the National Resource Conservation Service (NRCS) Web Soil Survey, a topographic survey from Civil Site Group Project Number 23189.02, dated October 11, 2025, aerial images, and the Geotechnical Evaluation Report from Braun Intertec Project Number B2508902, dated January 27, 2026. Existing Conditions The existing project site consists of a ~130,000 SF school and supporting parking facilities along with recreational facilities. It also includes a grass sports field surrounded by a running track and other track and field components. The draft Geotechnical Evaluation Report by Braun Intertec indicated that the native soils at this site consist of alluvially deposited clay loam and organic soils. According to the survey from Civil Site Group Surveying, the site drains to 6 separate subcatchments. Four of the subcatchments drain to onsite BMP’s (Subcatchments 1-4), and 2 drain offsite untreated (5&6). A 7th Subcatchment in the NW portion of the site drains overland and is conveyed by City storm drain at Hazeltine Blvd. See the Existing Drainage Map in Appendix C. The site is located in Minnehaha Creek Watershed District (MCWD) and therefore follows the MCWD permitting regulations. The majority of the site drains to ditch on Hazeltine Blvd which discharges to a pond south of Lake Luc y Road. This pond is within the hydrological boundary in MCWD but is within the jurisdictional boundary of Riley Purgatory Creek. LIDAR TOPOGRAPHY (from MNTOPO) HYDROLOGICAL AND DISTRICT BOUNDARIES (from MNTOPO) Proposed Conditions The proposed site modifications consist of replacing the grass sports field and the running track with a new synthetic turf field and the running track. This is designated on both the Existing and Proposed Drainage Maps as Subcatchment 6S. This will change the hydrologic boundary in the SE corner of the site closer to the jurisdictional boundary line due to the new sports field drainage now being directed west. Also apart of the improvements are 2 new building additions and associated parking. Three new stormwater management facilities will also be constructed. The first is an underground filtration system (Pond 3A-P) under the sports field, the second/third (Pond 3B-P and Pond 7) are above ground filtration systems that will treat roof and parking runoff. See the Proposed Drainage Map in Appendix C. Stormwater Objectives Based on the site size, the disturbance and the amount of increased impervious surface, the Minnehaha Creek Watershed District requires phosphorus control, rate control, and volume control for the additional impervious surface. With the site being predominantly D soil, filtration will be considered versus infiltration. For filtration, the required volume is for 2” of runoff (calculation for 2” treatment in Appendix B). Total Phosphorus (at least 60%), Total Suspended Solids (at least 90%) , and rate control will be provided using filtration. The size of the site is 30.7 acres, with 7.7 acres of existing impervious surfaces (7.4 acres of buildings and pavements, 0.3 acres of water). Approximately 8.2 acres will be disturbed on the site, which is less than 40% of the site (8.2/30.7=27%). There will be an increase of approximately 2.9 acres of impervious surface with the synthetic turf, new addition and parking improvements, the total of which is less than a 50% increase in impervious surface. For the treatment under the field, the aggregates and sand are modeled as having 30% voids. Providing a minimum of 3ft of sand for filtration beneath the synthetic turf, there will be 80,640 cf of filtration provided. The volume requirement is obtained in the first foot on the sand. The volume control requirement in the synthetic turf area will require 8,000 cf of abstraction. Fifty percent of the filtration volume equates to an abstraction volume credit of 40,320cf, which is higher than the requirement. Filtration Basin #3 provides the required storage for the ~70,500 SF of impervious that is routed to it, plus additional storage that will allow ~18,400 SF of impervious in the future. Filtration calculations are shown in Appendix B. HydroCAD calculations summaries are provided Appendix E and demonstrate that flow rate is reduced in the 2,10, and 100 yr storm events to all 3 points of discharge. The volume in 6S is reduced due to the reduction in area free drains offsite, but the total volume does increase due to the added impervious. The full HydroCad calculations are provided in a separate document. A MIDS model was completed to determine TP and TSS removal for the 3 new BMP’s. Assuming that all of the new and disturbed ground is routed to the new BMP’s, the TSS removal is 9 5% and TP is 86%. The undisturbed ground that is currently routed to existing BMP’s was ignored for this calculation. The MIDS summary can be found in Appendix F. Erosion and Sediment Control Temporary Control -A construction exit will be installed. Seeding will be used on disturbed areas to prevent erosion, and to allow permanent stabilization of the grassy areas in the future. Inlet protection will be used at all inlets to prevent sediment from entering into the storm sewers. Temporary soil stockpiles will have silt fence or other effective sediment controls, and will not be placed in surface waters, including storm water conveyances such as conduits and ditches. Stockpiles that remain on the site for more than 7 days shall be seeded, mulched, and surrounded by silt fence. Permanent Control – Natural turf will be established for complete stabilization on all disturbed pervious areas outside of the track and field. Synthetic turf will be placed over the aggregates within the track. Appendix A: Rainfall Analysis Data Rainfall Data Storm Event Rainfall (in) 1-Year 2.47 2-Year 2.84 10-Year 4.20 100-Year 7.18 Appendix B: Water Quality Volume Calculations NOTE: Additional volume in 3B-P allows for 18,413 SF of future impervious NOTE: Additional volume in 7-P allows for 236 SF of future impervious Appendix C: Drainage Maps EXISTING DRAINAGE MAP PROPOSED DRAINAGE MAP Appendix D: EXISTING VS PROPOSED SITE AREAS Appendix E: EXISTING VS PROPOSED RATE AND VOLUME SUMMARIES Appendix F: MIDS DIAGRAM AND CALCULATION SUMMARY