Loading...
73-01 - Central Business District ZOA pt 1PLANNING CO!9MISSION WORK SESSION MINUTES - Sept. 12, 1979 Page 2 On the map where our area into Hennepin County is shown, B which is the dashed line, turns south, which is 5. Apparently what they are thinking is that when 212 goes in, they would like to try to divert some of the traffic off of 5 down to 212 at this point. The philosophy of that doesn't bother him so much, but they actually show the link occurring within Chanhassen. He doesn't necessarily see that that will be reflected in our plans. In addition to the roads, the transportation network also includes pedestrian and bicycle. They do show a consistent link and it does hit a point in Chanhassen roughly right around the Lotus Lake, B. T. Land Develop- ment area which is consistent with one of our trails, so we do have a connecting link with Eden Prairie at that point. Mark stated as far as endorsing the extension of the Crosstown, as far as the comprehensive plan goes, the posture that we are not going to endorse nor are we going to fight that particular element of their transportation would be his opinion. That is something that is an integral part of their community planning and we recognize that. Jack Bell moved to endorse the extension of the Crosstown Highway as proposed by Eden Prairie, with the understanding that we are not changing the position that was previously established with respect to further extension through Chanhassen of Crosstown. Motion seconded by Walter Thompson and approved. On the points that are left of the Guide Plan elements, Mark stated he did not come across anything -that had adverse impact to the City of Chanhassen. Mark briefly described the material on the Land Use Element Survey Analysis. He pointed out a couple of things for the Planning Commissionts consideration, the cover page, summarizing major points, assembling a list and consider any very significant additions to that list or modifications that should be made to those. He included some map material on the existing land use in the city, he broke this out specifically from the land use map to get a better look at where residential is within the community, and where the other components are. Also, Land Use Implications, he would like to have underscored what we consider to be existing liabilities within the community from a land use perspective, and what some of the assets are within the community. Next a review of the land use sketch plan took place. Mark stated that the Lake Studies Committee now is actively pursuing developing some policies with regard to the dockage issue, and some recommendations should be coming from them soon. Mark stated that the residential area on the north side of 78th is part of the officially zoned CBD for Chanhassen, so therefore commercial development at the present time is likely to or could occur within that area. He felt that we need to do an overall review of what land is within the CBD. He stated one of the things that is going to have to be considered is the proposed extension of utility areas in five year increments. Scheduling of meetings for the next few months was discussed. Jack Bell moved to adjourn the meeting. Motion seconded by Walter Thompson and unanimously approved. Don Ashworth City Manager 4826 Chicago Avenue So. Minneapolis, Minnesota 55417 [P.R&ile:_�1 CC)UNc;LMEN November 20, 1974 ,4ur;11)N1 c;.iC•. MEMORANDUM rR; AS. .SST. ZONING BLDGTo: Lloyd Schnel1e, Administrator ` W ,MR. G. U City of Chanhassen, Minnesota Ti K TiLSI'Y SUP.. From: Carl R. Dale, AIP Planning Consultant Subject: Status and Situation Report on Current Planning Items A. Hesse Farm (PUD'and Preliminary Subdivision Plan) I have recently received apparently revised copies of this proposed plat; they still do not, however, include the notations I requested from Herb Baldwin. These notations would point out the open green space and "common" areas referred to in the proposed home owners' associatJori l e(lal pigw.rs. Without this information, I cannot make any final recommendation as to the: plans consistently with staff recommendations. It is my understanding, however, that the soil percolation tests have been poor and still further plan revisions may be required. -In any event, I would not recommend final approval of this plat until such time that a clear relationship is demon- strated between three elements: 1. Plan map notations'; 2. Home owners' association documents; and 3. Staff recommendations and public open space policy. B. Development Moratorium and Housing Policy/Guidelines/Criteria This matter seems to be in a state of total confusion. My comments and suggestions are as follows: An official policy statement is needed even if it states only that the City has no policy. * Federal and State financial aids (sewer, water, parks, etc.) and approval of such funding by the Metropolitan Council re.uires_a suitable housing policy. * The Central Cities have been most active in developing housing policy and very general guidelines have been developed by the Metropolitan Council. Suburban communities have far more discussion than actual, concrete results. * Metropolitan Council staff assistance is available but they are very slow and very general (working on it for over three years with Woodbury and Shoreview with no specifics approved to date). * Some close -in suburban communities have developed.housing policy state- ments of sorts although most are limited to the question of requiring a minimum amount of low-cost housing. For example, Golden Valley requires A 10% of all dwelling units in new projects to be low-cost -- the results have not been good and new and different problems have been created. In total, most housing policy statements have been rather ineffective. We do, however, have some statements approved and fairly good for some of the more rural suburbs similar to Chanhassen. * Low cost housing and a population mix is difficult in the far out suburbs due to a number of limitations (construction costs, lack of Federal financial aid, inadequate financing, high construction costs, lack of public transit, and high cost of land in some cases. There is also the problem of how you get people to remain mixed; people tend to move and segregate themselves along social and economic lines regardless of the housing types and costs available. * Some suburban communities still advocate a policy of exclusive, higher cost single family homes; this policy is, however, not so popular (or fashionable) as it was a few years ago. * I wc}Ill d recommend that less a I; Lellt'i oni be paid to low cost, housing and �:1,1 Illi''< fil1- Ulil�h 1111W13 R1 1•0111 ifin And 1 mv.pl`I) I��1�1 hi q Ppal icl hi approach 't o a sui tall I e distribution o'fb611 ile- 11 1 y 110"les v5 . iliu dwellings. Also, there should be more concern with feasible methods for preserving agricultural and low density areas where these may be desired for many years; this will eventually be a very controversial matter yet to be faced squarely by Chanhassen. • It will be most difficult to set up specific guidelines and standards for a housing mix, particularly if the City attempts to use them for applica- tion to each specific project. Guidelines on a City-wide basis is a more realistic approach. • Without professional help, prospects for a good housing policy are not very bright. C. Downtown Street Lighting Plan Should the City Council authorize the proposed lighting study, I should be notified immediately if we are to meet time schedule commitments which have already been made. If this proposed study is not authorized, I would, nonetheless, hope for permission to submit an even more limited set of recommendations with respect to this matter. At prosent, I can only say that the NSP plan is not very creative and cer- tainly not; thr. bust 'hat: r,ollld ho achignd-, its only real attribute is that oV ol'l"Ic,loc icty gold Lw coy )L (1)(Ah in'iti:i'I 'Old '10119 'LOV11 ). If.the Downtown is to grow and prosper, the best use of every feature possible must be utilized to its fullest potential. Bright lights alone will not do the job (as evidenced by a similar attempt some years ago in North St. Paul, many other small downtowns, and the numerous "great white ways" that have fallen behind in sales volumes. -2- November 19, 1974 Summary of Alternative Costs to the City of Chanhassen for Undergrounding the Main Street I. Underground West 78th Street from West of the Chanhassen State Bank to West of the railroad tracks. a. NSP to restore blacktop, concrete & sod. $24,950.00 b. The City of Chanhassen to be responsible for all compaction and restoration of blacktop, concrete & sod. 2,450.00 If the city,desires to pay off the underground service costs of the seven residential customers, add $1,120.00 to the cost shown. II. Undergrounding West 78th Street from West of the Railroad tracks to East of Chanhassen Estates. a. NSP to restore blacktop, concrete &sod. 9,600.00 If the city desires to pay off the underground service cost of the two residential customers, add $320.00 to the cost shown. III. Underground Highway #101 from West 78th Street to State Highway #5. a. NSP to restore blacktop, concrete & sod. 10,607.00 If the city desires to pay off the underground service cost of the two residential customers, add $320.00 to the cost shown. Total. Undergrounding the three areas. a. NSP to restore blacktop, concrete & sod. 45,157.00 b. NSP to restore blacktop, concrete & sod East of railroad tracks & Highway #101 South of West 78th Street. The city to restore blacktop, concrete & sod the rest of the way. 22,657.00 If the city desires to pay off the underground service cost of the eleven residential customers, add $1760.00. JAL/mb NORTHERN STATES POWER COMPANY MINNETONKA DIVISION EXCELSIOR, MINNESOTA SS331 9Y THE WATERS OF MINNETONKA" November 19, 1974 City of Chanhassen Chanhassen, Minnesota 55317 Attn: Lloyd Schnelle Dear Mr. Schnelle: We sent you a letter on September 20, 1974 and met with you and the CBD on October 15, 1974 explaining where we would underground the main street and what we would charge. We were asked by the CBD to also give you a cost to remove the overhead on Highway #101 from West 78th Street to State Highway #5. We will do this for $10,607. (See the enclosed sketch). Also enclosed is a new summary sheet of the costs for the three areas. Sincerely, H. C. Hanson Division Manager HCH/mb Enclosures tJJ-' y ia/ RUSSELL H. LARSON CRAIG M. MERTZ RIISSELL H. LARSON ATTORNEY AT LAW I9OO FIRST NATIONAL BANK BUILDING MINNEAPOLIS, MINNESOTA 55402 MAYOR COUNCILMEN _ OOUNCILMEN_- COUrdCILr.':EN July 9 , 1974 Cl !�-AUh1 TPFEAS. -- -- --- .. ASST. ZONING BLDG. Ir:.gP --_ Mr. Lloyd G. Schnelle PUB. VVK. GiR. City Administrator UT!L!TY SUPT. Box 147 --- -- Chanhassen, MN 55317 — — - Re: City operated parking facility for the CBD Dear Mr. Schnelle , TELEPHONE 335 — O5c35 At the June 26, 1974, meeting of the Planning Commission the question was raised as to whether the City could provide parking in the downtown area by leasing private property, improve the same and assess the cost of the improvements back against the benefited properties. Our review of the law indicates that such an arrangement is permissible. Acquisition of Property. Minnesota Statutes 459. 14(1) provides, in part, that any city or village may acquire by gift, lease, purchase or condemnation any real property deemed by the city council to be necessary for the improvement of traffic control on city streets by providing and operating off-street parking areas. This statute further provides, however, that no product or service other than the parking of vehicles shall be furnished at or in connection with any such parking facility. Improvements. Minnesota Statutes 459. 14(1) further provides that the city may expend municipal funds for the purpose of equipping, maintaining and operating such an auto- mobile parking facility. The statute is silent on the question of who becomes the owner of any improvements made by the City (as lessee) upon termination of the lease. Under the general rule of landlord -tenant law, which would seem to be applicable in this case, any improvements would automatically become the property of the landlord at the termi- nation of the lease. In negotiating such a lease, special attention should be given to its duration or term. A "short term" lease could be construed by the courts as an illegal attempt to spend public funds for the purpose of enriching a private party. Neither the statute nor the case law offers us any real guidance as to the question of how long a lease must be to be safe from a legal attack on the above described grounds. Mr. Lloyd G. Schnelle - 2 - July 9, 1974 Fianancing. Minnesota Statutes 459. 14(2) provides that the city may pay for the cost of providing such parking facilities by any of the following methods or any combination of the following methods: 1. Appropriating monies out of municipal funds. 2. Levying a tax, not exceeding one-half mil in any one year, on all taxable property in the city. 3. Levying special assessments against benefited property. 4. Appropriating any or all rret revenues derived from the operation of the parking facility. 5. Classifying the users of such facilities as a subject for taxation, and imposing taxes thereon computed according to the extent of use of the facilities. 6. Borrowing money and issuing bonds. (Minnesota Statutes 459.14(3) regulates the terms of any such bond issue.) 7. Imposing reasonable parking fees for the use of the parking facility which may be in excess of the actual cost of operation of the parking facility. Special Assessment Financing. Minnesota Statutes 459. 14(7) provides that such an automobile parking facility is a local improvement within the meaning of the special assessment chapter (Minnesota Statutes 429) and may be financed, in whole or in part, by special assessments levied in accordance with Chapter 429. Thus, the procedural requirements for financing a public parking facility by special assessment would be the same as any other local improvement. In addition, subdivision 7 of 459.14 provides that if the city council in levying such assessments determines that all or part of the benefited property is benefited to a lesser extent than other property, it may establish separate benefit districts for the improvement; each district comprising property benefited to a like extent whether or not contiguous, and may provide either a different rate of assessment or, in lieu thereof, a different number of installments payable at such times as the city council shall determine. Mr. Lloyd G. Schnelle - 3 - July 9, 1974 Conclusion. From the foregoing discussion it can be concluded that it would be legally permissible for the City of Chanhassen to acquire a public parking facility in the downtown area by leasing private property, improving the same and specially assessing the costs incurred thereby against the benefited properties. Very truly yours, RUSSELL H. LARSON Chanhassen City Attorney /1 C MM/RHL/m John P. Brose Route 4 Box 838• Excelsior, Mn. 55331 r,j f« II Comm. Enterprises Inc. y;r 7515 Wayzata Blvd. I� Minneapolis, Minn. I' i' Henry A. Pauly 7561 Great Plains Blvd.j! Chanhassen, Mn. 55317 1 Char -Lynn Foundation ;; Frontier Develop. Corp. 15151 Highway # 5 Chanhassen, Minn. 55317 Eden Praire, Minn. 55343 Ann Koltyk W. 78th St. Chanhassen, Minn. 55317 Eleanore Sinnen 410 Chan View Chanhassen, Mn. 55311 I; American Oil Co. Chanhassen Concrete. 4940 Viking Drive Corp. Minneapolis, Mn. 55435 11 Spring Park, Minn. 1 Mr. Frank Kurvers'w Henry M. Mason Route 4 Box 510 % Daniel Klingelhutz Excelsior, Mn. 55331 Chaska, Minn. 55318 Loretta Kelm I! Martin Schlenk 225 W. 78th St. �S 227 W. 78th St. Chanhassen, Mn. 55317 II.., Chanhassen, Mn. 55317 I Church of St. Huberts '� James Thompson 7801 Great Plains Blvd..VAI 7722 Frontier Trail i Chanhassen, Mn. 55317 ,i Chanhassen, Mn. 55317 I Anna Sinnen Gerald Yanisch 410 Chan View 7727 Frontier Trail Chanhassen, Mn. 55311 Chanhassen, Mn. 55317 c, Ole Iverson Willard H. Pauly 223 Chan View ti 7721 Frontier Trail Chanhassen, Mn. 55317`' Chanhassen, Mn. 55317 1". 4 Viola Buschkowsky `` Marvin Swen'sen 206 W. 78th St. 207 Chan View Chanhassen, Mn. $5317 Chanhassen, Mn. 55317 ,1 Schneider Agency, Inc. C4" Chanhassen Bank Bldg. Chanhassen, Mn. 55317 Chanhassen American Legion Post No. 580 Chanhassen, Mn. 55317 x� j Duane Gordon 4 Post Office Box 262 Chanhassen, Mn. 55317 Daniel Klingelhutz Chaska, Minn. 55318 i i, ;, I Donovin Throne 1 Route 2 Box 116 d;i Mound, Minn. 55364 I I M, William T. Cash 7725 Frontier Trail Chanhassen, Mn. 55317 II �q Bernard Schnieder 220 W. 78th St. Chanhassen, Mn. 55317 George P. Shorba 306 Chan View Chanhassen, Mn. 55317 ;I ,i 4� John Huber i 520 2 St J Excelsior, Mn. 55331 1.4 Martin J. Ward j1 Dallas F. Caspesius i Dickey & Shaver Inc. Chanhassen, Mn. 55317 �: Shako ee, Mn. P �: 259 East Lake Wayzata, Mn. Emil Pauly,; Mn. Victoria Oil Co. ,I r Ray Rettler 7603 Great Plains Blvd.1: Victoria, Minn. ' 484 W. 78th St. Chanhassen, Mn. 55317 Chanhassen, Mn. 55317 Walter H. Hanson Roger Bongard Frank H. Bongard 'St. 7607 Great Plains Blvd. 19350 W. 78th Chanhassen, Mn. 55317 ,'ti r; Eden Praire, Mn. 55345 Chanhassen Realty Ave I:n; Henry Schutrop. Chaska, Mn. 55318 �. °� Don Hanus 3740 Tonkawood Rd. 1014 Excelsior � �k j; Hopkins, Mn. Hopkins, Minn. I IE 7 Kenneth Lindeman Vern zetah kj Harold Lund 7608 Iroquois i 7500 Erie Avenue Chanhassen, Mn, 55317 I 7508 Erie Avenue Chanhassen, Mn. 55317 Chanhassen, Mn. 55317 !I Frank Kohman Ralph Kant John Havlik 7615 Kiowa f�.; 7613 Kiowa r< 513 Chan View Chanhassen, Mn. 55317 j! Chanhassen, Mn. 55317 Chanhassen, Mn. 55317 Arthur Kerber + John Schultz I. Deam Wallentine 511 Chan View 509 Chan View 507 ChanView 55317 Chanhassen, Mn. 55317 Chanhassen, Mn. 55317 Czanhasen, Mn. Jerry Hiemerl Ralph Fuhrman Raymond Roufs 501 Chan View Chanhassen, Mn. 55317 G ;; 7614 Kiow'a Chanhassen, Mn. 55317 1 7615 Laredo Drive Chanhassen, Mn. 55317 Henry A. Pauly & Donald;'-11 '' Thomas 0. Klingelhutz 77th St. K Leo Bovy 7339 Frontier Trail Stodola Sr. Chanhassen, Mn. 55317 225 W. Chanhassen, Mn. 55317 Chanhassen, Mn. 55317 Hansen & Klingelhutz W. M. Kerber Robert H. Mason, Inc. 7198 Frontier Trail 18811 W. 78th St. ` 14201 Excelsior Blvd. Chanhassen, Mn. 55317 Eden Praire, Mn. I Minnetonka, Minn. ,1 Texaco Inc. 332 S. Michigan Ave. Chicago,- Ill. 60604 Waycrosse Inc. Cargill Bldg. Minneapolis, Mn. Ines4lell,41ZP 1XIA166 I r OIL I r -4 Chanhassen Holding Co. Mn. Valley Nat. Gas 4913 West Conventry Rd. St. Peter, Minn. Hopkins, Minn. Leslee J. Renner i Will Johnson Narrows %Dorn Builders Excelsior, Mn. 55331 Box 278 Excelsior, Mn. 55331 N CENTRAL BUSINESS DISTRICT PARKING SURVEY Prepared for: THE CITY OF CHANHASSEN February 26, 1974 Prepared by: �} �IL l I SUM--301 cTncept �11 "�' Corp0ratk5 1 Minnesota 55420 TABLE OF CONTENTS INTRODUCTION ....... ................... . 1 FIELD SURVEY ON PARKING DEMAND .... 2 Space Inventory .......................... I..................... 2 Occupancy Levels..... .......... . ... 2 Efficiency of Space Utilization (Turnover) ................. 5 Summary of Survey Findings ................... .... .... 12 PARKING DEMAND ............................ 14 RECOMMENDED ACTIONS ........ .. ............. 18 APPENDIX - ASSESSMENT FORMULA .................................... 21 LIST OF GRAPHICS Graphic 1 ...................... ................. ........ SPACE INVENTORY . 3 �J Graphic 2 TOTAL PARKING OCCUPANCY ............................ ........ ... 4 Graphic 3 PERCENT OF OCCUPANCY FOR SELECTED OFF-STREET LOTS ................ 6 Graphic 4 PERCENT OF OCCUPANCY FOR SELECTED ON -STREET PARKING ............ 7 Graphic 5 PARKING TURNOVER ................................................... 14 INTRODUCTION This report is part of a continuing effort by the City of Chanhassen to properly plan and develop the Central Business District (CBD) of Chanhassen. The report on parking needs for the CBD is intended to be an integral part of the Concept Plan for the Chanhassen Central Business District prepared for the City in November, 1972 by Design Planning Associates, Inc. The report deals with both the current parking situation as well as using parking needs and parking characteristics as a planning tool in implementation of the CBD Concept Plan. Analysis of Chanhassen's parking requirements and current usage indicates unique parking -- characteristics and indicate the current development structure and functional relationship of the CBD. The rapid growth of the nighttime entertainment business has, largely sur- passed the development of other CBD functions such as retail shopping and service facilities. This disproportionate amount of nighttime attractions have unique parking requirements. The space provided to meet the nighttime needs does, however, present development opportunities which should be beneficial in future attempts to develop the CBD with a z diversity of uses. ti 01 ?lNrUdt:R:.. .#'� _ 't .n --s. ,.- .��'� s �--.,�a.-voi:�.�marxnx:..„.n, �u:ru�.��.�..:..�..�•�..�...n ,.,.o.r...y...�...�,. ,... .----'-' FIELD SURVEY ON PARKING DEMAND On Friday, October 12, 1973, Development Concept Corporation conducted a parking survey from 10:30 a.m. to 9:30 p.m. Each space in the Central Business District (CBD) was assigned a numeration route and was checked at one-half hour intervals, noting, the auto License number of each occupied space. The survey data provided the basis for determining peak demand times and locations, occupancy levels, duration of stay and Location of problem areas. The actual field work was done by The Chanhassen Firemens' J Auxiliary, under the direction of personnel from Development Concept Corporation. Concurrent with the control survey, a representative of Development Concept Corporation observed the general workability of the parking system and noticed specific conflict areas until 11:30 p.m. IThe following subsections outline the findings of that survey. Space Inventory Graphic 1 shows the location of the parking spaces within the CBD and indicates by lot and block front the number of spaces available. There are a total of 914 spaces within the Central Business District; of which 806 are off-street and 106 on -street spaces. This space inventory does not include the large lot west of Animal Fair, Inc. as that area is considered industrial and not a functioning part of the Central Business District. Further, this calculation does not include the amount of space within the two service stations (Lots G and K) and the school lot (Lot C) east of Great Plains Boulevard. Occupancy Levels Graphic 2 shows the total occupied parking spaces as a function of time. The occupancy level and peak parking times are not typical of most CBD situations when compared to parking space occupancy for similar studies conducted in White Bear Lake and Grand Rapids, Minnesota. Both White Bear Lake and Grand Rapids provide a full range of convenience and shoppers goods retail outlets and on the day of the survey were open during the day as well as the evening. The time of peak demand occurs during the day- time in those communities due to the influence of retail trade. Also, the relative flatness of the occupancy curve is quite different than that found in Chanhassen. Chanhassen's high concentration of nighttime attractions accounts for a comparatively high volume of vehicles in the evening. Nearly one-third of the vehicles parked in Chanhassen during IMU, VN Rp)'MAS 75 \\.\\ a�Na� ll, qu aAj.IQ OPO-An cc IEI L-.-j L..' i -,—" a) 'C' . - 0 Ird!D Zod!D- to 91 U14 fill I. ,.'� �x g g cn C4 act L" VS mom �S GOD._A O 9 N O co n E in <4 W 0 iw QZ =O 4 °C U� WO ("1 ~ N 0 O m J Q d I.- W W = ~ Ine a Lice 0 � ~ V J Z Z �0� CL� a6u U— NO �0 W z Q V cm: N W J d 6a J N W ad H W F- >j� W � � W � � Z ' W J } Lij 0 Lu W Z cc Z ►— O ►— d%�cn";a:'•lii'P�,.-s�•�!'.ws.�Pr �' ��s;: ...�., T.�..r..... e.. , n the survey period were parked- in the CBD at 9:30 p.m. Further, the graphic shows that during most of the daylight hours, a vast resource .of vacant parking spaces is available. This daytime vacant space presents a development opportunity which will be presented later in the report. Graphics 3 and 4 show percent of occupancy of selected areas in the Central Business District for the survey period. The parking system in the western part of the CBD and both sides of West 78th Street function adequately. The area in and around the Frontier Complex experienced no conflict or lack of adequate parking throughout the survey period. . The percent of occupancy is comparatively high in the area on the east end of West 78th Street, including the Colonial Shopping Center lot (Lot E).and Lot A found behind Jerry's Bar and Pauly's Restaurant and Bar. The Colonial Shopping Center (Lot E) was often at or near capacity in the early evenings (5:00 p.m. to 10:00 p.m.). .Congestion in the lot, however, was not entirely caused by the shopping center patrons, but by the patrons of the restaurant, liquor store and the two bars south of West 78th Street. . i Another area generating a relatively high amount of vehicles for the space available was the building housing the Frontier Bell Beauty Salon, an insurance agent, and a dentist. These uses are served by only three on -street spaces on the north side of West 78th Street. Most customers to this bulking use the south side of West 78th Street or the northwest corner of the Dinner Theatre Lot (Lot P). Efficiency of Space Utilization (Turnover) Parking turnover measures the number of vehicles a parking space accommodates during a survey period. Turnover is a measure of efficiency of the parking spaces and is directly related to occupancy rate and duration of parking. Tables 1 and 2 compare the turn- over rates, average stay and percent of vehicles staying less than one-half hour and one hour for each of the surveyed lots and block fronts in the Central Business District. The primary characteristic of the Central Business District uses is that they generate parking with a long duration of stay. The current turnover rates are quite low throughout the Business District. This presents no problem when the occupancy rates are also very low. Therefore, during the major part of the day there are no parts of the CBD which' suffer congestion for the lack of space turnover caused by the long duration parker. See Graphic 5 for the general pattern of space utilization (turnover) for the survey period. �z.;�, rh ifi � �; xr:'•"is.:.�s�e,'���` ,a �="'�'�`tTs:��',kiQrit`f#`�'1'�"1.:�`3"��:w�'_�ISiJi:r'�H<�k!f�"=�t:. N H O J H W W CC LL LL r 0 cn W U U = W a. J W Uj 0 rL D V V 0 z w w a a► } gipp.: �..QQ. J�...1 '.J.J H 0J • � r :,, •, c 10 4uaoaad z 0 s ■ 24 0 z U LO 10 0 r) 0 1 1 00 00 t� fl- 4ugoied 0 /T.f 14T,,♦i `f ::' 1 ?SI" }4t. „y 'f..4 s 7v'r4 fir IF .Y�.T> a{Y ..}Y... .. �•o ...Y� ( JAB. 4�'jt{.�6''AEf�'H4iaY -+iF`�1�` a']'MfY.. [[ t .� — �Y� L�LL�1itlV..a�— 1 TABLE 1 EFFICIENCY OF SPACE UTILIZATION - OFF-STREET PARKING (10:30 a.m. - 9:30 p.m.) Total Vehicles Space Hours Percent Staying less Lot Vehicles Parked Per Space Occupied** Average Stay than 1/2 Hr. *** 'T A 247 4.2 384 1 .55 hr. 33 B 18 1.6 63 3.48 hr. 0 C 7* N.A. 18 2.57 hr. N.A. D 23 1.9 27 1 .20 hr. 55 E 390 6.7 423 1 .08 hr. 6.1 F 16 1.8 59 3.70 hr :. 0 G 25* N.A. 41 1 .62 hr. N.A. .� H N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. N.A. J 94 1.3 172 1 .82hr. 8 K N.A. N.A. N.A. N.A. N.A. L N.A. N.A. N.A. N.A. N.A. M 49 1.0 168 3.42 hr. 14 -^ N 133 1.4 211 1.58 hr. 45 O 118 3.5 216 1.83 hr. 39 P 368 1.2 772 2.09 hr. 7 Q N.A. N.A. N.A. N.A. N.A. 7 R N.A. N.A. N.A. N.A. N.A. Total -- Surveyed 1,488 2,554 1.72 hr. -( * Estimate ** Space hours occupied = total occupied spaces - 23 checks x 11 hours *** Does not include new vehicle on last check as that vehicle may have stayed longer than 1/2 hour. 'r� V'�. t' ..:;'�l .�r.� �rvTF..:�'t..'�7i.�.F�:4`E.�4Y'YVS.i'�Mn:•%.�ii �'}li�Ti0.+3NR. �tlS3wF:'YH�{W�v�;tl _ TABLE 2 ,EFFICIENCY OF SPACE UTILIZATION - ON -STREET PARKING (10:30 a.m. - 9:30 p.m.) Street Total Vehicles Space Hours Percent Staying less Code Vehicles Parked Per Space Occupied* Average Stay than 1/2 Hr. ** 78-1 19 0.9 71 3.8 hr. 0 78-2 20 3.3 39 2.0 hr. 17 78-3 23 4.6 44 1.9 hr. 13 78-4 58 7.2 61 1:1 hr. 57 7.9-5 1d. 2.3 9 .6'hr. 71 78-6 16 2.3 11 .7 hr. 56 78-7 42 .7.0 52 1.2 hr. 39 78-8 16 5.3 24 1.5 hr. 25 78-9 35 5.0 51 1.5 hr. 13 78-10 18 1.1 41 2.2 hr. 22 GP-1 14 4.7 23 1.7 hr. 50 GP-2 10 2.5 10 1.0 hr. 70 GP-3 19 1.5 24 1.3 hr. 35 Total 304 2.9 460 1.5 hr. * Space hours occupied _ total occupied spaces/ 23 checks x 11 hours ** Does not include new vehicle on last check as that vehicle may have stayed longer than 1/2 hour. Rl L —.J C. Cc-' LLJ CO) 711 arc LA JU -act am The only area by the nature of its use requiring a relatively high turnover rate is the Colonial Shopping Center. Although the shopping center lot (Lot E) showed a moderately high turnover rate of 6.7 vehicles per space for the survey period it was hampered con Siderably by the long duration parker and.patrons of the bars and restaurants to the south of West 78th Street. The congestion of Lot E is, in part, caused by the relative location of the lot to the uses to the south of West 78th Street, and is further amplified by the shortage of parking space .directly available to the uses south of West 78th Street. TABLE 3 UTILIZATION OF THE COLONIAL SHOPPING CENTER LOT (LOT E)* Vehicles Less Than Less Than Over Total Per One -Half Hour** One Hour* Four Hours Lane Vehicles Space Number Percent Number Percent Number Percent 1 144 8.0 112 77 127 88 9 6 2 83 6.4 44 53 65 78 6 7 3 74 5.7 41 55 54 73 2 3 4 89 6.4 48 53 63 71 9 10 Colonial Lot Total 390 6.7 245 63 309 79 26 6 * Lanes are numbered from the shopping center building toward West 78th Street. ** Includes last check. A more detailed indication of the utilization of the Colonial Shopping Center lot (Lot E) is shown above in Table 3. The following points further illustrate the parking situation in this general area: ;T 7_+1W'P:rs.W.B[1RC • During the survey period, 10:30 a.m. to 9:30 p.m., 66 percent of the space hours were occupied in Lot E. ° Between 5:00 p.m. and 9:30 p.m., 84 percent of the spaces were occupied in Lot E. • 26 vehicles, or 6 percent of the total vehicles occupied space for over four hours with an average stay of 5-1/2 hours. These 26 vehicles occupied 32 percent of the space hours utilized in the survey period. Those 26 vehicles staying more than 4 hours preempted the space for a potential for 145 vehicles parking one hour or less. • A one hour parking limit in Lot E would have accommodated 79 percent of the vehicles utilizing the lot during the survey period. A two hour limit would have accommodated 89 percent of the vehicles. • To further amplify, the problem, Lots A and E, and the on -street parking on West 78th Street showed a very high occupancy level during the same period (5:00 p.m. to 10:00 p.m.). It may be concluded from these factors and other survey data that there currently exists a shortage of space in that general area. Summary of Survey Findings The Chanhassen Central Business District is quite unique in both its physical use makeup and parking requirements. The disproportionate amount of entertainment uses within the Central Business District and a relatively small retail sales base have resulted in a relatively high demand for space in the evening hours as compared to the daylight hours. Therefore, a reserve of unused space during the daytime exists which could serve new development that operates between 9:00 a.m. and 5:00 p.m. Some daytime uses could be added with- out increasing the amount of space in the Central Business District. Most of the major uses within the Central Business District require parking space to accom- modate the long duration parker. The restaurants, beauty shops, bars, manufacturers, etc., require a large amount of parking space to function and do not rely on the turnover or multiple use of space which is evident in Central Business Districts oriented to retail sales functions. It should be noted that as more retail uses are introduced to the Central Business District, the efficiency of space utilization will become more important and such factors as enforced time limits, space marking, and a control of employee parking will be required. IV, �{�(�`' ��.�i:��°��;0.xi'G.71�R:`YE.�+1fW'4ft7i�ii�e°S..S"a43Tk'�M-_:a`l".N.�iWL7eti�w_nx�c ar.,e.n...��vrw...e..a.,.•�_,.a.. _ __ �_.—.____._... The area In the vicinity of the intersection of West 78th Street and Highway 101 in the evening hours became quite congested due to the conflicts and the peak demands of the uses in the area and the shortage of spaces available to serve those needs. Two uses currently need improvement of the parking space turnover rate to accommodate short term parking needs. These are: the Colonial Shopping Center and Pauly's Liquor Store on the southwest corner of West 78th Street and Highway 101 . Lot E, serving the Colonial Shopping Center, was sufficiently congested between 5:00 p.m. and 6:30 p.m. and again between 8:30 p.m. and 10:00 p.m. to discourage prospective shoppers from seeking space in the lot to shop at the center. In the same general area, Pauly's Liquor Store does not have adequate short term space to operate due to its neighboring uses with long duration parking needs. On -street space marking currently does not exist. Because of primary nighttime utiliza- tion of most on -street space it would not be beneficial to mark the on -street spaces at this time. An exception would be the West 78th Street block fronts directly west of Highway 101 (78-4 and 78-7). The proper marking of this area could possibly increase the utilization of these block fronts from 5 to 10 vehicles per day. Similar results could be obtained by marking Lots A and E provided that lighting in those lots were also improved. Circulation to parking areas appears to be workable except for the combined drive .of the DX Station and the Colonial Shopping Center. Any improvement of the shopping center lot (Lot E) should consider modification of the curb cut arrangement. The survey findings suggest modifications to the CBD Concept Plan. These proposed changes are included in the Proposed Actions section. 13 PARKING DEMAND In addition to the field survey which measures the actual utilization of parking spaces, '4 It is also necessary to calculate an optimum or peak demand potential for the Central Business District based upon normal parking standards for each use. Table 4 indicates the parking peak demand standards for each use assuming the uses were developed as freestanding developments without the benefit of sharing parking spaces with neighboring facilities. One of the benefits of grouping uses in a CBD is that seldom do ' all uses have the peak demand at the some time and therefore, fewer spaces are required to accommodate the aggregate needs of the CBD. Therefore, the totals for both daytime and nighttime space needs should be regarded as somewhat high and are presented only as a basis of indicating potential CBD parking demand for individual uses. For the purposes of calculating the current CBD parking needs that reflect an aggregate potential, results of"the survey taken on Friday, October 12, 1973, will be utilized. The nighttime peak demand was: observed during the survey at about 600 vehicles or 65 percent of the total potential, a nighttime parking demand of 962 spaces. For purposes of calculating parking needs for the various areas in the CBD, 80 percent of the potential nighttime parking demand as shown on Table 4wiII be utilized on the assumption that the parking demand on the day of..the survey was approximately 15 percent less than the peak day of the year. The nighttime demand, because it is so much higher than the daytime demand, becomes the controlling factor in determining the current adequacy of the parking space inventory. Daytime parking needs are currently being met and should only become a concern as new daytime uses are located in the Central Business District. At the present time there is sufficient parking space south of West 78th Street to accommodate new uses which would be exclusively daytime functions. There are two areas that will, in the near future, or presently do not have sufficient park- ing to meet nighttime demand. These areas are: (1) The area in the vicinity of the : shopping center and the bars at the intersection of Highway 101 and West 7Bth Street, and (2) the Chanhassen Dinner Theatre Complex. 1, The area in the vicinity of Trunk Highway 101 and West 78th Street includes a total of seven facilities with a nighttime demand totalling 222 spaces. Parking space available to these nighttime uses totals 182 on and off-street spaces, not including the space at the Texaco Service Station. This results in a deficit of 40 spaces to meet the needs of this area at the current time. 14 TABLE 4 POTENTIAL PARKING DEMAND BY USE Space Needs Use Gross Floor Standard Daytime Nighttime Area (Sq. Ft.) Space:Sq. Ft. (9 a.m.-5 p.m.) (5 p.m.-1 a.m.) Jerry's Old West Bar 3,200 1 SO 130) 64 O Leary's Kitchen 2,300 1:125 18 18 Pau ly's Bar and Restaurant 5,000 1:50 20 (1) 100 Pauly's Liquor Store 1,200 1:150 g 8 Antiques 700 1:150 _ IKenney's Supermarket 71700 1:150 51 51 IChalet Pizza 2,100 1:125 17 17 Bart's Pharmacy 2,800 1:150 19 19 I Beauty Shop, Dentist, Insurance 1,700 1:150 11 - Bongards 4,100 1:150 27 _ jGreenwoods Sign Company 3,500 1:400 9 _ Hann's Properties 15,100 1:400 38 _ Riviera Supper Club 6,000 1.50 - 120 Post Office 2,400 1:150 16 - Frontier Furniture 15,000 1:400 38 - Chanhassen Dinner Theatre(2) - - 1150) 575 Frontier Lumber and Hardware 20,400 1:400 51 - Vacant Store (Frontier) 5,600 1:150 37 _ 15 -:+W iY...q. tC:N".:':�:' r�%!- '. .'M:: '....., i,. +-.s[::"'M•.:.L..:.'�1X!4fM>:.fa�/...:pPti�Ms,^i.ru.-•«+—a a..w�v�.+.a...+..�.. ..� TABLE 4 POTENTIAL PARKING DEMAND BY USE (Continued) Space Needs Gross Floor Standard Daytime Nighttime Use Area (Sq. Ft.) Space:Sq. Ft. (9 a.m.-5 p.m.) (5 p.m.-1 a.m.) Animal Fair 45,000 1:400 113 - Minnetonka Labs 14,000 1:400 35 - Cleaners 1,500 1:150 10 10 TOTAL DEMAND 651 962 (')Assume 20 percent of peak demand. (2) Based on seating capacity (one space per 3 seats) on a�-41it.fi»'311R '.r.1..1'11'W" "', tm:. '+''4i"r .. .: ., 'S.*Cl:t'-'�ad"z.d�.i '7:iR)Ai.f!. idH.cxe. s :+a,•aa. r� .. ...x..s....�... 2. Chanhassen Dinner Theatre Complex currently has a nighttime demand of 492 spaces. This is based upon the assumption of seating capacities as follows: • Dinner Theatre, 600 ® Downstairs, 125 1° Bronco, 250 e Banquet Rooms, 500 In the immediate vicinity of the Chanhassen Dinner Complex there are 532 spaces available including both on and off-street parking facilities. Therefore, a total excess of 40 spaces is currently available to the dinner theatre complex. However, it is anticipated that the Courtyard Theatre will be opened within the near future. This facility will have a capacity of 250 people and therefore will require another 83 spaces, leaving a net deficit of 43 spaces. It should be noted that the above calculations for the Chanhassen Dinner Theatre Complex assumed 100 percent of the potential nighttime demand due to its position as the dominant use in the Business District. However, in calculating the parking needs for the area in the vicinity of West 78th Street and Highway 101, 80 percent of the aggregate demand was utilized. The purpose of this section has been to identify the relationship of parking demand to the supply. The recommendations section will provide alternative solutions to resolving the parking space deficits indicated in this section. 17 QM� RECOMMENDED ACTIONS The following recommendations are based upon the findings of the parking survey taken on October 12, 1973 and the goals and objectives of the Concept Plan for the Chanhassen Central Business District. The recommendations are listed in order of relative importance in solving immediate problems rather than on the basis of significance to implementation of the Concept Plan. 1 . The most immediate problem in the Central Business District is the congestion in the Colonial Shopping Center lot (Lot E). It is imperative that for the health of the Colonial Shopping Center, as well as the continued health of the retail function of the Central Business District, that Lot E be programmed to serve the fast turnover retail functions first, and the long term parker second. The owner of the shopping center in the past has been reluctant to police the operation of the lot, as this action could cause hard feelings and lose business. This could be resolved if the City were able to control operation of the lot. As the pri- mary purpose of this lot is to serve the shopping center, it is not recommended that the City buy the lot, but rather encourage the owner to lease the lot to the City on an annual basis for a minimal fee. This arrangement would put the lot in the control of the City in order that they could set time limits and enforce the regulations when required. If such an arrangement could be made it is recommended that the following improvements to the lot be made with major assessment going to the shopping center owner: a. Design and stripe the parking lot per accepted parking space standards taking into consideration resolving the access congestion adjacent to the DX Service Station . b. Make lighting improvements to the lot. C. Post a one hour time limit for the first three lanes adjacent to the shopping center building. Post a two hour limit on the lane adjacent to West 78th Street. Signing should be visible and the hours of enforcement (10:00 a.m. to 10:00 p.m.) clearly marked. d. Enforce primarily in the hours between 5:00 and 10:00 p.m. 18 2. Recommendation 1 only improves the operation of the Colonial Shopping Center lot (Lot E) and does not alleviate the shortage of some 40 spaces in this general area. It is recommended that Lot A be upgraded and expanded to the south and west to accommodate another 40 spaces. Two basic implementation options are available; a. Acquire additional land and develop entirely as a public lot. The acquisition and construction cost will be financed through an assessment district with the assessment being weighted upon the benefit received. It should be noted that any new daytime use in this area could be developed between the public lot and the Chanhassen Dinner Theatre Lot without providing any additional parking: Irregardless of whether or not a use is immediately developed between Lots A and P, the property has development potential and would be a .major recipient of the benefit of a new public lot and should be assessed appropriately. b. The second option is to encourage the private development of the property between Lots A and P for daytime use and to require that the developer pro- vide the parking to the magnitude of approximately 40 spaces adjacent to. Lot A. This solution would require, however, that the Village become in- volved in the improvement of both the private and existing public portions of Lot A and to make either acquisition or lease arrangements similar to that proposed in Recom Viendation 1 for Lot E. 3. Due to the large amount of parking spaces south of West 78th Street devoted to serving nighttime entertainment uses, it is recommended that additional uses intro- duced to the area between Lots A and P serve daytime functions only in order to utilize the existing parking base. Uses which would fit this daytime requirement best would be business and professional office, medical and dental office, govern- mental office, mortuary, and retail sales and service functions which are limited to daytime operation. 4. The owners of the Chanhassen Dinner Theatre Complex have acquired the property directly to the east of their parking lot (Lot P) in order to accommodate additional parking for the anticipated opening of the Courtyard Theatre within the complex. Development of this area for additional parking is in conflict with the Concept Plan. Further the Concept Plan includes a proposed street lying between the cabinet shop and the main dinner theatre building. This street would run through Lot R which presently provides employee parking for the complex. It is recommended that the City investigate the potential of running that street south of the cabinet shop along the tracks to avoid reducing the parking capacity of Lot R. Further, if this road alignment can be accomplished, the dinner theatre management should be encouraged to make improvements in Lot R and increase its capacity with a goal of 40 additional spaces. This solution would enable them to discard their plans for expansion of Lot P to the east in favor of developing the parcel into a daytime use. This solution would accomplish a primary objective of the Concept Plan at the same time providing convenient parking in closer proximity to the dinner theatre itself. To adequately use Lot R, however, the development of the new street would have to be made at least to the cabinet shop. 5. The medical and dental facility offices and personal services shown on the Concept Plan and located between the Colonial Shopping Center and Chan View, would be more appropriately located south of West 78th Street. The space that these uses occupy on the Concept Plan should be devoted to either residential or retail com- mercial facilities. 6. The specific parking needs for.the area north of West 78th Street, other than the area around the Colonial Shopping Center, cannot be determined until such time a specific development plan is brought into the area. However, it is recommended that effort to balance daytime and nighttime parking utilization should be exercised in this area also. It is expected that if a balance between daytime and nighttime parking needs is accomplished, the objective of developing a diversified Central Business District with a multiplicity of functions will also be accomplished. 7. The parking system for the Central Business District should be a combination of private and public parking facilities. It is recommended that the entire CBD be included in the parking assessment district. The share of assessment for parking lot acquisition and improvements should be based on a formula calculated to determine benefit from the improvement. The some formula may also be used to finance other types of CBD improvements, such as pedestrian malls and walkways, street furniture, and landscaping. (See Appendix for suggested assessment formula format) 20 APPENDIX ASSESSMENT FORMULA 21 SAMPLE ASSESSMENT FORMULA. Because of the complexity of calculating assessments, it is suggested that the .following procedures be followed. As you will note, these procedures closely follow those for normal street, water, or sewer improvement projects. The formula of assigning assess- ments as shown here has been developed from experiences in Hopkins and White Bear Lake, Minnesota. Suggested Procedure 1. Prepare the general development plans for individual parking lots as well as preliminary cost estimates. 2. Hold a public hearing on the general plans, assessment formula, and preliminary cost estimates. Because of the complexity of the assessment formula do not attempt to compute individual assessments at this time. 3. Prepare final detailed plans and, specifications as well as refined cost estimates. 4. Hold a public hearing on Item 3 above pursuant to Minnesota Statutes. a, 5. Submit project for bids pnd award in accordance with recognized legal procedure. 6. Construct parking lots. 7. During construction compute individual assessments for each property. 8. Hold a public hearing on individual assessments. Payments can be spread over a 20 year period with equal payments plus interest. Formula for Assessment The individual assessment against each property within the assessment district is based upon three quantities; land value, need factor, and proximity by zone. The sum total of all assessments equals the total cost of the project. 1. Formula: P = X + Y + Z Where: P = Total project cost X = Sum of all land value factors assessments Y = Sum of all need factors assessments Z = Sum of all proximity factors assessments or, X = 15% of P ' Y 35% of P Z = 500 of P 2. Land Value Factor X Individual Land Value Factor Assessment x = aX Solve for a: a = b c a = individual assessment factor b = total assessed value of assessment district c = assessed value of individual property Solve for x: x = aX x = individual assessment X = sum of all land value factor or 15% (P) 3. Need Factor Y Set up 10 categories of land uses based upon parking need as defined in the City Zoning Ordinance and assign a point factor similar to the following: (d ) Category Land Use Point Value I (High Intensity Retail) 10 2 (Low Intensity Retail) 9 3 8 4 7 5 6 6 (Warehouses) 5 7 4 8 (Multiple) 3 9 (Vacant Lots and Homes) 2 10 Note: These point values can be charted to get fractional point values if desired. Credits for existing parking provided by the land use Point Values 2 for adequate parking 4 inadequate parking 6 little or no parking provided Potential of Property (land only) Point Value 1 2 3 4 5 (f) (e) Land Area - Square Feet 0 - 2,750 2,751 - 5,000 5,001 - 10,000 10,001 15,000 15,001 - plus Individual Need Factor Assessment y = g (d + e + f) Solve for g: g = Y T g = dollar value per assessed point Y = 'sum of all need factors or 35% (P) T total assessed points of assessment district properties. Solve for y: y = g (d + e + f) y = individual assessment d = point value for need e = point value for credits f = point value for potential of property JAN 1974 Jack Anderson Associates APIQ TRAFFIC ENGINEERING CONSULTANTS n RECEiVEr) L VIL.LAGE OF 0Y V TELEPHONE 612-777-8976 January 21, 1974 ,1�, Mr. John Neveaux, Chairman Subj: Final Report on Planning Commision Traffic Engineering Box 147 for 1973 Chanhassen, Minnesota, 55317 Dear Mr. Neveaux, Transmitted herewith is a report on traffic engineering work done for the Village of Chanhassen by our firm during the year 1973. The report is submitted in accordance with the accord reached in our meeting of August 3 which was attended by Mayor Klinglehutz. Resubmitted is the June, 1973 billing in the amount of $748.75 which we now consider due and payable. In accordance with our dis- cussion, the additional work to summarize our work in a report format is a non -charge item. Payment of the current billing will be consid- ered payment for all services to date. We are very sorry that you were not satisfied with our previous work and we have done a considerable amount of soul searching to try to determine what the problem was so it wouldn't happen again. With your patience, I would like to take this opportunity to give you our thoughts on it. One problem obviously was that when we started this business ven- ture we understood that it was conventional practice among consultants to charge time on a portal to portal basis. However, the long trip out to Chanhassen from our office resulted in excessive charge time for travel. On March 29 this was discussed with Adolph Tesness and an adjustment was made to charge travel only one way. Also discussed with Adolph were charges for work related to Chan- hassen traffic problems that were not specific assignments under the terms of our contract agreement. An adjustment was made on that account reducing our March 1 billing from $821.15 to.-581.5 . Assuming that everything was squared away we accepted further assignments through June until charges had accrued to the present $748.75. An area of significant misunderstanding wcis the e;:nected format of the traffic engineering input. As you stated, you expected a report format in order that you would have some tangible documentation in your files. On the other hand, we had anticipated that the input format would be informal, largely verbal, and with technical memos as necessary to transmit detailed information. As you will see in the first paragraph of our announcement brochure we were organized to provide "over the shoulder" assistance. Be that as it may, the report WHITE BEAR HILLS PROFESSIONAL CENTER 0 2553 EAST COUNTY ROAD E 0 WHITE BEAR LAKE, MINN. 55110 should satisfy your requirement and we have learned from this exper- ience to be more explicit on this point with our new clients. In our meeting you noted that your budget did not provide for a large expenditure for traffic engineering. I take this to be a refer- ence to the Planning Commission budget, and I agree that you should not be one to finance this input. Traffic engineering input should be financed on the same basis as other engineering. The charges should be borne by the developer in the case of a new proposal, or borne by the municipality at large if the work is a general benefit. We have found that most communities allocate traffic engineering costs in this manner. Specifically in the case of new development, Planning Commissions either instruct the developer to have a traffic report prepared at his own cost, or charge the developer for the cost of the traffic engineering work performed by the municipality's consultant. I certainly would recommend your investigating these op- tions for future work. It would be unfortunate for you to conduct your planning process without the benefit of traffic engineering evaluations. As much as I would hope that your dissatisfaction lies in the areas outlined above, it just doesn't seem possible taht your depth of feeling could stem from them because they seem relatively easy to work out. The only factor remaining is the relevance and accuracy of the work that was done. This has not been questioned to my know- ledge, leaving me with the disappointing conclusion that the work was not satisfactory because it did not agree with conclusions already drawn. If that is the case, it is the best argument possible for early input of traffic data to the planning process. Again, if that is the case, it wouldn't be the first time that realistic traffic input has been neglected until it becomes an awkward and embarrassing issue. I do not wish to dwell on this last point, but since Chanhassen is the only client I have had any difficulty with, and since my cred- ibility is my most important asset, I must emphasize how important it is for me to maintain a position of telling it like it is. I am not in the business of doing a disservice to my client by telling him only what he would like to hear. If I am off base on this possible area of dissatisfaction, I sincerely apologize. You must understand that I an trying to get to the bottom of a very puzzling situation. If you can shed more light on what happened, it would be deeply appreciated. In conclusion, I wish to thank you for the opportunity of work- ing for Chanhassen during 1973. Should you have the need for further discussion of the report, or the need for traffic input in the future please note that we are now located in new offices in White Bear Lake. Ole-sOregards in the new year, t � W. Anderson, P.E. JWA:jda V/ TRAFFIC EVALUATION CHANHASSEN Ci3D CONCEPT PLAN JACK ANDERST ASSOCIATES 1073 TRAFFIC EVALUATION OF CHANHASSEN CBD CONCEPT PLAN I. INTRODUCTION In November of 1972, the planning firm of Design Planning Associates prepared and presented a "Concept Plan" for the Chanhassen central business district (CBD). The main thrust of the plan was to provide land use proposals and an architectural theme for renovation of the core area in terms of providing a stimulating and satisfying environ- ment for shoppers. In addition to the potential concept plan for the CBD, the report in- cluded a graphic of a preliminary land use plan for areas adjacent to State Trunk Highway 5 (TH 5) from County Road 17 to the east Village limits. In the area east of the CBD core, (Figure 1), there were a number of traffic planning considerations that needed further evalua- tion from the standpoint of future traffic operations, some of which were already causing concern to residents. Subsequently, traffic engineering expertise was sought to (1) make an evaluation of the east area, and (2) provide staff with traffic planning input to relate current development proposals to the longer range Concept Plan. II.STUDY APPROACH Because input was needed for current development proposals as well as potential future needs, the Concept Plan was first reviewed as a framework for development. Then identifiable problems were treated as separate study elements. Prior to detailed study, the problem areas were discussed with Village staff and priorities assigned. Assignments were made for more detailed evaluation of the following areas: (Figure 1) A. Future upgrading of T.H.5 B. Design geometrics of proposed access. C. Intersection locations on T.H.S. D. Remote frontage roads on T.H.S. E. Geometric design standards for frontage roads. F. East intersection of T.H. 101 and 78th St. G. Access to the Buesgens proposed development. H. Frontage road west of Dakota Ave. to T.H. 101. I. Other Jac knderson Associates ?a� M rt a b 0 10 0 go fD Ck• En yrt •1 !D (D rt w t-h H C) A M to rt •0 ra r i ■100 0 00An 1, Existing ? T . H %, Z 101 - I i I,IIII I ► I, I, 10 •I/1l/1/1l�r�_ II • r . i H r ■ . - CA � • H - ►!', r • ■ a - ._ 0 C' r i � r r 'd C7 r rt ■ r' - 0 cr d r• C r to rt a rt � r -rl - ►fit rt CA 00 M I rt W m ID A ►i fD rt M . O i 0 s- W rt . , - - - r r - - ■ Chanhassen = •- ■ i - Proposed T.H. 101 - sales sells tlltllttllt/tttttttttago all t/llitt!////aIII Citv Limits Eden Prairie EO V 00 M rt w ra - G � w n '.0 nor r :w t.n . fp :O - C3. r - r - - !/�i!//!!!!/fe_1111111Itlllltlllllllllltt/l ■ -2- During the evaluation, close contact with Village staff was maintained so the staff could take advantage of the findings as they may have more general application within the Village. This also enabled the traffic engineer to get an overview of other traffic concerns in the Village and provide suggestions for corrective action. The report then is a series of summaries of work done and recommenda- tions made in the course of several months of traffic consulting work in support of the Village staff and Planning Commission. III. DISCUSSION OF ASSIGNED PROBLEM AREAS The principle charge in the traffic engineering evaluation of the pro- posed Concept Plan for the CBD was to provide comment on the plan's ability to provide a framework for development of the vacant land east of the CBD. As the work progressed, specific problem areas were defined. These were discussed with the Village staff and assignments were made to provide data on each problem area. Some problems were related to future development, while some were related to current proposals that needed more immediate decisions. The following sections summarize the findings and discussions on each of the problem areas. The order of presentation is important to the extent that decisons are related to the timetable for upgrading of T.H. 5 to the divided highway status proposed. A significant delay in implementation of the proposed upgrading would upset much of the proposed Concept Plan pro- visions for access to the CBD. Accordingly, future upgrading of T.H. 5 is the first item addressed. A. FUTURE UPGRADING OF T.H. 5. A vital element in the Chanhassen CBD Concept Plan is the proposed upgrading of T.H. 5 to expressway standards, including an interchange structure at T.H. 101 and attendant ramp connections for access to the CBD. A review of the MHD "Backbone System" for establishing job prior- ities indicates that the prospects for implementation of the proposed upgrading is bleak at best. Therefore, it is concluded that access will continue to be via at -grade intersections for the forseeable -3- future, and that the location of at -grade intersections on T.H. 5 should be a major element in the CBD Concept Plan. The intersections are covered in detail in Section C - Intersection Locations. A detailed explanation of the "Backbone System" is appended, but essentially it identifies priority roads in the State, and indicates the rate that needed improvements could be made to these priority roads with the current level of funding. Currently T.H.5 has such a low priority that funding of major improvements are not contemplated in the next 30 years. A significant change in funding levels would be necessary to significantly change that time frame. A one cent increase in the gas tax, for example, would change the schedule only four or five years. It is always possible that changes in priorities and funding levels will occur, and even now the Metro Council is considering a different thoroughfare plan which would affect T.H. 5. Preservation of adequate right-of-way for potential improvements is always a good investment. In this regard it is noted that the right-of-way requirement for the proposed intersections on T.H. 5 is basically the same as the require- ment for the roadways between intersections. (Figure 2) It is there- fore recommended that a uniform width of 200 feet be preserved along T.H.5 throughout its length within the Village of Chanhassen. Adjacent communities should be encouraged to do likewise. B. DESIGN GEOMETRICS OF PROPOSED ACCESS Although in Section A it was concluded that the Concept Plan was invalid with respect to proposed bridges on T.H. 5, it is well to discuss the merits of the proposal to point out some specific deficiencies in the Concept. The Concept Plan indicates cutting off existing access at the 78th - Dakota Avenue intersection, and providing a pair of ramps to the east from a proposed bridge over T.H. 5 at existing T.H. 101. Geometrically it would be very difficult, and excessively costly to provide the west- bound off -ramp connection as shown. Grade differentials would be such that T. H. 101 would have to bridge over both T.H. 5 and the railroad )a,,� Anderson Associates w t 3 7 J lY. � 2 CY � Q 2 r� v ZI 4Y V uj �Q Q3 uu N Y I V q c, c Q tu -4- tracks, and would not touch down until it reached 78th St. The off - ramp configuration is grossly out of scale. The area actually re- quired by construction of such a ramp would cut off access to the com- mercial service area shown in the northeast quadrant, (Figure 3). Extension of the off -ramp as a service road in the north-west quadrant would be at such an elevation that its property access function would be unfulfilled over most of its length. Access to the proposed east- bound on -ramp would be circuitous to the point where motorists would consider using an alternative route via 78th St. Moreover, the resi- dential area (Woodhill) south of T.H. 5 would be adversely affected by ramp traffic. Reversing the grade to carry T.H. 5 over T.H. 101 would partially remove some of these deficiencies. However, a far more detailed geometric design study of this alternative would be necessary before conclusive statements could be made on this point. There is agreement that access to the core area needs to be improved. with or without the interchange ramps. It is understood that both the existing intersections are used heavily depending on ones destin- ation and familiarity with the area. It is our conclusion that both of these intersections can and should be improved, not only to provide needed accessibility to the CBD core area, but .for safe traffic oper- ations as well, until the proposed interchange becomes feasible. C. INTERSECTION LOCATIONS ON T.H. 5 Given that major upgrading of T.H.5 is not in the offing, that access to the core area will be via at -grade intersections, and that the exist- ing 78th St. intersection is now a major access to the core area, it seems illogical that this major access should be cut off. With this in mind,a preliminary layout was prepared and presented to the Plan- ning Commission as part of the work. The intersection concept included a proposed frontage road and proposed revisions to the east intersec- tion of T.H. 101 and 78th St. Figure 4 is a copy of the concept intersection , some of which will be discussed later in Section F. In later work involving analysis of the existing T.H.101 - T.H. 5 j . y1 I Alt PUBLIC r 1 + RE191DAINTIAL / i COM OFF-- Isi IL a. j COM SERV i�OMM � '� � •' f '0 3 i JI _ Fa 6 �.._ � � 1.•°'r � I-� .. _ - ' COM SERV �� °� R<SIDtNT1A SERV , COM l� •s , SERV • - . Mr bEVELOPMENT J PRELIMINARY 8 .err• �wr� Aw' 0�0 LAND USE PLAN PROBABLE RAMP ALINE7,1ENT FIGURE 3 -5- intersection, it became obvious that there are distinct geometric advantages in combining work on the two intersections so they could be constructed at the same time. The reversing curvature of T.H.5 through this area would make thi3 combination a natural. A layout showing both intersections was not produced, however both intersections would be similar to Figure 4. Since uniform spacing of intersections is desireable from the stand- point of traffic signal progressions, it was then determined that good opportunities for additional intersections on T.H. 5 would occur at a point 1650 feet east of the existing 78th St. intersection and one at the East City Limits. Between intersections no median open- ings should be permitted. Additional information on this point is found in Section D. it should be noted that during the traffic evaluation, the MHD was contacted for their concurrence in the intersection concept. A copy of Figure 4 is in their files at the Golden Valley District Office. D. REMOTE FRONTAGE ROADS ON T.H. 5 The Concept Plan indicated a plan for remote frontage roads parallel- ing T.H. 5 from Dakota Avenue easterly to the City Limits. Also, on the south side a frontage road was shown extended westerly through the Westhill Addition. From the traffic operations standpoint, the remote frontage roads are highly desireable, particularly of all access to T.H. 5 is via the frontage road to one of the designated intersections. This suggests that the frontage roads should be located one lot deep from T.H. 5 the actual distance being a function of the lot size needed to satisfy the proposed land use. The connection of the frontage road to the crossing street should be located several hundred feet away from the T.H. 5 intersection to allow room for vehicle storage and some weaving distance. A distance of 400 ft. from centerline to centerline is sug- gested although if traffic volumes are expected to be light, 300 ft. might be adequate. STATE OF MINNESOTA DEPARTMENT OF HIGHWAYS MAJOR TRUNK HIGHWAYS "BACKBONE SYSTEM" PROPOSED CONSTRUCTION GROUPED BY PRIORITY FREEWAY- EXPRESSWAY (ADEQUATEI N' ••••-•• FRWY-EXPRWY SCHED. THRU '73 ' ..........TWO LANE FACILITY (ADEQUATE) -1ST PRIORITY ... $813.4 OUT. $511302 ` METR, f 302 0 2ND PRIORITY ... $409.6 OUT. $256.9 METR.$ 152.7 INTERSTATE -- _..z f IN f1,000,000'S -3 INCLUDES R/W A ENGR. i YLk 1 , r lAIM,IdAF: �LLC -a, MUL "i ':.0 T7:'; — A I I11 V 1972 FUNDING PRIORITIES FIGURE A f Jack Anderson Associates TRAFFIC ENGINEFRINO CONGULTANTf 2553 East County Road E Tiite Bear Lake, Minn,5511i,9 777-8976 August 5, 1973 Mr. W. D. Schoe ll Schoell and Madson, inc. 50 Ninth Avenue South Hopkins; Minnesota, 55343 Dear Bill, I am enclosing two prints which have been discussed with the Chanhassen. Planning Commission relative to my evaluation of the C B D concept. The smaller of the two prints indicates the type of channe"i7ation that I believe is appropriate to both the TH 5-101 intPrsec:y.ion and the TH 5-'Dakota intersection. It is my recommendation that both intersections should be improved at the same time. Otherwise, poor geometrics are inevitable. The larger print indicates my suggested intersection spacing along TH 5, featuring remote frontage roads to eliminate private entrance access to TH 5. Actual alinement of the remote frontage roads is flexible so long as the first intersection is located well away from TH 5. At the July 18 meeting (Chanhassen - we discussed the prospect of the Woodhill Subdivision traffic coring east through the existing development. I anticipate this will be a real problem unless the Woodhill Subdivision is rearrange: to make access to the proposed frontage road more cenvc-!nient. Hopefully, something is being done about that. If you need more information, please call. pW lyyours, Anderson, P. E. cc: Jerry Schlenk John Neveaux Russ Larson Carl Dale AUG lgi3l RECErVED C:7- vrLLAnt olp CNANNASSthi. NIIIN `cr+; DESIGN PLANNING ASSOCIATES, INC. 4826 Chicago Avenue So. Minneapolis, Minnesota 55417 Phone: (612) 822-2106 July 23, 1973 PLANNING REPORT For: Central Business District Committees By: Carl R. Dale, AIP Planning Consultant Subject: Follow-up to CBD Committee meeting held July 11, 1973; Re: Work Program for Steering and Subcommittees. Background As noted in the Concept Plan for the Chanhassen Central Business District, the main objective is to retain and improve the CBD as a viable and competitive commercial area as new business districts are proposed and developed in the Community. Apparently, a general concensus is that this is a worthwhile goal and there seems to be general agreement as to what should be done and the current interest, then, is centered upon how and when and by whom. The basic framework suggested has been that of a highly coordinated and cooperative effort. between Nr'ivate and public interests similar to the approach taken in White Bear Lake, Minnesota. At this time, there is no consideration of a highly complicated, Federal aid urban renewal program. In Chanhassen, the emphasis would be on a do-it-yourself, local program with significant results to be expected within a period of about five (5) years. It was noted at the meeting that many communities have attempted Downtown improvement programs but that only a relatively few have been a success. The main ingredients to a successful program are: a) A true and sincere desire to proceed on.the part of public interests; b) Involvement of land owners and tennants; c) A desire and willingness to participate achievement of the stated goals; and d) A step-by-step action program diligently participants. A committee structure has been established assign specific work programs and establish completion of the various assignments. The list of assignments and time schedules: and work towards carried out by willing and the next step is to some time -table for following is a suggested COMPLETION COMMITTEE TASK TIME COMMENTS Steering Visit other communities to Oct. 1973 Over-all responsi. observe results or status of bility for coor- other similar projects such as dination and Hopkins, White Bear Lake, communication witl Montevideo, Cedar -Riverside in Village and pri= Minneapolis, Wayzata, and others vate interests. as well as reviewing informa- tion from widespread national efforts. Receive reports from sub -committees and develop five- year program for project comple- tion. Examine priorities and select one initial public improve- ment that may be started yet this year. Finance Secure information from various Nov. 1973 This may be the sources including other comm- key factor and unities as to alternative most important. methods to finance projects and improvements of this type. This could and should include cost totals, effects upon property owners, cost by type of improvement, and the like. Architecture This has to do with selecting and Experience in recommending an architectural Oct. 1973 other communities "theme" to use as a guide for has indicated evaluating Downtown building and that considerable site improvements. This task help is required includes formulation of some guide- for individual lines as to how individual prop- owners as most erty owners should proceed to will not hire an obtain advice and assistance. It Architect or is suggested also that the sub- otherwise finan- committee look into any histor- cially obligate ical aspects of the area, sites, themselves to buildings, and the like which individual effort, may be of importance. Parking It is suggested that the main Nov. 1973 A review and visit responsibility should be that to other commun- of interviewing and recommend- ities would be ing a private firm to conduct most helpful. a parking study and survey as recommended earlier. Such a study and survey should be conducted this Summer or early Fall. Based upon this study, recommendations should be made concerning a total parking program (financing, private vs. public responsi- bility, parking restrictions, etc.) Vital questions of public policy are involved here as well as total area development coordina- tion. It is estimated that parking study costs would be approximately $2,000.00 Relocation The first task is to begin noting which uses are not compatible with the five year plan and which should be encouraged to move out of the CBD. For example, the few residential uses should be so encouraged and the task is twofold: 1. So inform resident and help his seek a buyer; and 2. Assist in finding a new location in accordance with his desires and within his financial means. On -going but first report should be in to Steering Comm- ittee by Oct. 1973. A most deli- cate and important task that must be handled with great care and even compass- ion. Of the above tasks and assignments, only one should involve public expendi- tures at this time; that task is the actual parking study and survey. It should also be noted that the above described tasks are the beginning of a series that would extend over the total five year period. Upon request by the individual committees and as approved by the Village, additional detail and assistance can be obtained from the Planning Consultant. The completion times noted above are intended to be those dates which reports of some substance can be submitted for consideration by the Steering Committee and not dates for total completion of task assignments. C ".D Committee Meeting .1 July 11, 1873 Chanhassen Grillage Hall na:r a*or Klinglehutz cooled the CBD Committee meeting to order in the Chanhassen Village Hall on July 11, 1973. The following persons were present: Cale Dale, Ann Ko3tyk, Tim Stone, Jim Piielke, Mayoz Klinglehutz, Arnie Tybe, Dan Herbst, Herb Bloomberg, Prank Kurvers, Adolph Tessness, Bernard Schneider, nark Geijer, John Havli.k, Rich- ard Moyle, Bob Beaugrand, and Ralph Thrane. Carl Dale talked about the up-gradixig and improving the older area - in Chanhassen, He said this will sork only if the gover-xment and private Enterprise agree to do something. This is the structure he feels is necessary to make this m,cept work. Committee Structure Village Council Private Business Stearing (overall) Action Committee Subcommittees: L. Finance Committee 2. Parking Committee 3. Architural Theme 4. Relocation Committee Mr. Dale recommends the Stering Committee visit other cities, ones that have done things and ones that have not done things. He -Iso recommends that additional studies be made. The committee should make a five year goal for completion of the project. The following persons will be on the following committees: l.Action Committee: Steve Wolf, Jim Mielke, John Havlik, Ton Klinglehutz, Harry Pauly, Dave Reed, Herb Bloomberg. 2.Finance Committee: Ed Dunn, Bernard Schneider 3.Architectural Committee: Tim Stone, Dan Herbstico-chairman), Elmer Aagard, Ann Koltyk, and Ann Neils. 4.Parking: Arnie Ryba(chairman), Francis Klien, Frank Kur- vers, and Adolph Tessness 5.Relocation: Carl Dale will get mail to members to bev,�.Y working on the project. The meeting was adjorned. CENTRAL BUSINESS DISTRICT PRELIMINARY REPORT ON CHANHASSEN BUSINESSES June 14, 1973 1) Coat of paint on the Frontier Belle Weeds on side of Building Maintain parking area in back, seal coat and stripes 2) Colonial Parking Lot Patched Sealed striped Rear should be cleaned up Deliveries should be made in the rear Suggest Black Topping 3) White House Clean up premises Trim Shrubbery Remove Windschitl's fish house 4) Feed Mill Cut weeds behind and around Remove old machinery 5 ) B_ONGARDS Move Bottle gas along the side of the building into an enclosure behind the back of the building Weed Control 6) Hanus Building West Side - Fence for buffer between Hanus Property and Riviera West side should be black topped Remove junk 7) Riviera Does a fine job 8) John Havlik Remove some of the cars and unnecessary vehicles Does a good job except for cars - removal would enhance property 9 f Bank Strip Parking Lot 10) Animal Fair Commend 11) Minnetonka Laboratories Commend 12) Frontier Need maintenance on gas lamps Page 2 13) Ann Koltyk Cut grass on property Remove delapidated garage Black top driveway on west side of building 14) Pauly's Good Appearance 15) Fenholttimking, Inc. Cut weeds on property 16) Western Concrete Severe Dust problem 17 ) Lazy C Dust problem 18) St. Hubert's Weeds along fences 19) Laundromat Good Appearance 20) Hansen & Klingelhutz property near Laundromat Weed Control CENTRAL BUSIbFt;SS DISTRICT COMMITTEE MINUTES - May 17, 1973 The CBD Committee met on May 17, 1973 at 8:00 p.m.. in the Chanhassen Village Hall.. The following persons were present: James Mieike, Arnold Ryba, Mayor Al Klingelhutz and Robert Mayer. CBD ACTION COMMITTEE: There was a discussion on a- CBD Action Committee and iow ��t+will carry out it's plans. The CBD Action Committee.will take care of details working through the Planning Camrmissio.i and then to the Village Council. The following persons are recommended for the CBD Action Committee and Sub -lommittee: Stave Wolf i1n Mielke ithn Havlik, E i Dunn 7oi . Klingelhutz i Harry Pauly✓ Bernard Schneider/ Elsner Aagard Al Klingelhutz✓" ARCHITECTURE AND DESIGN SUB COMMITTEE: The following persons were recamen or the Arc tecture SW -Committee: Tim Stone Dan Herbst Jerry Yanish Elmer-Aagard- Ann Koltyk 7 T WFIC AND PARKING SUB COMMITTEE: The following people were recommended Ur the Traffic and Parking Sub Committee: Arnold Ryba Francis Klein Frank Kurvers Adolph Tessness 9:30 p.m. Meeting Adjourned Sharon Loechler Secretary � pr;_1 30. 1973 "L±nnin- 3ormts9ion 7Till,7e of ^'na.nra,ssen lhgnhassen, -Ti_nnesota Dear jommissionersc ?-represen+ P, small group interested in possible purchase of a business nrop-r+ - located in ^h�nhass^n. TTor..e'ver, refore we conti.nue further with our plans, we would like your opinions and iudaements re,Yarding our present plans for the property. The property is a house located on the north side of the m,in business street of rh,,nhassen, between the grain elevator --d +he building which houses the d.---,r1+ist's office, insurance office and beauty s'aon. T+, is curNAn+- 1- owned bv F-Trs. Ray Mingo and other members of her family. ( I do not knoT•r the legal description. The attached paces summarize briefly and in roumh form our present plans for the use of the property if tine were to purchase it together with sketches of what we are consideri-7 for �--Prance of the property. I can be reached at vDrk at 925-4300 ^nd at home at 471-9441 , 'We would 'very much appreciate any information that you can ?ive to us which we wl,ll need to consider in our plans. Sincerii-, Sharon ". T-.Tarner DESCRIPTI ON I. Interior Main Floor: Children's Shop-- rooms to be decorated to retain the turn of the century design already present in the house. The shop would be primarily for sale of children?s clothing together with small furnishings such as pictures, lamps, cradles and wall hangings. Original rooms would be retained in structure and decorated individually. Second Floor: Living quarters for one member of the corporation, in- cluding bedroom, sitting room and kitchen- the property has previously been used as a duplex. Basement: Storage space for shop materials and for stock. II. Exterior House: minimum additions and changes at present. All would be done to emphasize the present age of the house and to retain the turn of the century effect. The only planned immediate change would include the addition of shutters and trim together with repairs and cleanup. Front Yard: left intact as it is presently except for cleanup and addition of a sign post. Back Yard: retained as a yard as much as possible- at present this would involve cleanup and repair. We would like to have access via the backyard to the outside entrance to the basement which would be our stack area. We would also consider it for off street parking should this become necessary. These waz ]d be our be ginming plans; we would want to keep the shop small with a definite character and flavor. DRUG STORES GENERAL OFFICES: TEL. SPmmr. 7-8400 4300 PETERSON AVENUE March 8, 1973 CHICAGO. ILLINOIS 60646 Mr. Douglas Hansen President Hansen & Klingelhutz Construction Inc. 7198 Frontier Trail Chanhassen, Minnesota 55317 Re: Proposed Store Location Dear Mr. Hansen: Thank you for the information on the redevelopment of the Chanhass_en.Business District.' I would like to take agood look into this development as we are not currently serving this Minneapolis area. I hope that the proposed development will be strong enough to hold customers and businesses downtown. I am concerned about future growth and desirable shopping center locations on the periphery of the business district. Do you have any information on present family units or multiple units being built or planned? This will help our decision. I hope to discuss this the end of the month. information on future housing units approved JAR:dp matter when I arrive around Please let me know if you have area development in terms'of by the Village Trustees. Sincerely, i James A. Reynolds Regional Manager Real Estate Department RHL 3/5/73 PROPOSED AMENDMENT TO CHANHASSEN ZONING ORDINANCE SECTION 13. CENTRAL BUSINESS DISTRICT. 13.01 Objectives and Definition: The Central Business District, herein- after sometimes referred to as "CBD", is that geographic area included in the General Concept Plan for the identral business area as approved by resolution of the Village Council on the day of 197 The objectives of the following regulations are: 1. To help as.sure that all uses, new development and construction, building and site rehabilitation, remodeling, property access, parking, and pedestrian circulation are in conformity to the Comprehensive Municipal Plan and the Central Business District Concept Plan. 2. To help develop and maintain the Central Business District as an economic, social, and physical asset to the entire Village. 3. To recognize the unique and special problems of the Central Business District not common to new commercial areas. 4. To help coordinance all private and public development activities in a manner consistent with the General Concept Plan objectives. 13.02 Uses. Within the Central Business District, the use of buildings or land shall be permitted only upon the securing of a conditional use permit, including but without limitation to the following: 1. All new construction requiring a building permit and exceeding $500.00 in value. 2. All exterior rehabilitation of buildings except normal maintenance. 3. All public improvements. 4. All site changes such as access drives, parking arrangements, landscaping, and similar changes. 5 . All signs. 6. Such other activities as determined by the Zoning Administrator which may affect the Central Business District Concept Plan. The following shall not require a Conditional Use Permit: 1. Interior remodeling except those requiring structural changes and those involving a new entrance or exit for the building involved. 2. Activities which, as determined by the Zoning Administrator, have no significant effect upon the Central Business District Concept objectives. 13.03 Variances. In the consideration of conditional use permit applications the Village Council may grant variances in the building setback, height, sign, parking, yard, area, lot width and depth, and other regulations of the Chanhassen Zoning and Subdivision Ordinances if such variances are found to be consistent with the goals and objectives of the Comprehensive Municipal Plan and the Central Business District Concept Plan. 13.04 Procedures. Application for Conditional Use Permits shall be governed by the provisions of Section 23, Conditional Use Permits, of this ordinance. 13.05 Boundaries of the Central Business District. In addition to those tracts and parcels of land as shown within the boundaries of the Central Business District on that certain map entitled "Central Business District" dated _ _ 197 , the boundaries. of the Central Business District shall include the following described tracts and parcels of land: *BrANDARD March 1, 1973 Mr. Adolph Tessness Clerk - Administrator Village of Chanhassen Chanhassen, Minnesota 55317 Dear Mr. Tessness: SS #00709 (5353) TRUNK HWY. #101 & TRUNK HWY. #5 CHANHASSEN. MINNESOTA Standard Oil Division American Oil Company Western Region 114 East Armour Boulevard Kansas City, Missouri 64111 816-561-4140 We are pleased to hereby acknowledge receipt of your notice dated February 12, 1973, together with the ConceptPlan, Chanhassen Central Business District, Chanhassen, Minnesota. This company is always excited in new ideas and new concepts in that our experience has shown that as a community prospers so do our investments in such communities. A review of your preliminary land use plan as generated by the Design Planning Associates, Inc. of Minneapolis, Minnesota, does indicate that this company by virtue of its service station facility as located, captioned above, has a vital interest in your Concept Plan. In particular, we hereby make inquiry as to whether or not your Concept Plan has developed to the point whereby your office has "clearly separated the various functional uses and coordinated their relationships by zoning, making all incompatible land uses nonconforming." Please see Paragraph 11 under caption "Other Basic Plan Proposals." We have taken note of your proposed meeting dated March 13, 1973. Yours truly, W. S. Williams 6 78,g'� Attorney �p /jwof �pR Chanhassen - Feb 230 1 3 Technical Memo - Initial Review of Chanhassen OBD Concept- Roads During 1972, the Minnesota Highway Depart,ient prepared a report reflecting their problem of funding highways with the existing gas tax structure. j Realizing their inability to satisfy the demand for road construction throughout the Stale, they devised a service level aXOY� classification for all trunk highways, determined priorities for construct- ion and indicated a time frame for implementation.. T.H. 5, while recognized as a major trunk (potentiasl ex- pressway with divided roadways), did not appear as a priority I (with -in 20 years), or priority II (within 30 years). Changes in funding would obviously change the time frame, but it is thought that upgrading is well into the future. With that in mind, it is probably too far sighted to anticipate additional right-of-way reservation for general widwning of the highway, the existing 200 foot RA would accommodate a divided roadway if no attempt were made to utilize the existing road. for one direction. It is reasonable to expect significant improvements to be made in the form of intersection channelizations and signalizations, however, and right of way requirements for these needs can be predicted with reasonable accuracy. It is noted that the 4WD area required for a highway interchange is somewhat understated as shown on the 6oncept Plan drawings, similarly, frontage road set -backs are affected, at least with the standard diamond interchange configuration shown. A luernative configurations could be devised to change this, but further information would be needed to determine the needs for access to property beyond the limits of the Concept Plan drawings. The existing railroad crossing on TH 101 is recognized as a detriment to the CBD. It is noted that some 700-800 feet east of TH 101, TH 5 is in a substantial out section which provides ab opportunity for bridging both TH 5 and the Railroect tracks. Since this fits in with the proposed alinement of the south frontage road, it is suggested that this be looked into as a possible future option. Right of way widths noted on developers proposals for frontage roads in this area are too narrow (501). The function of a frontage read in this situation is similar to that of a minor arterial. Provision for at least one lane for emergency, parking should be made. Provision for sidewalks should also be made. Additional width may be required for drainage ditchs and the like, however these needs can be satisfied by easements. A discussion of appropriate right of way widths is needed )before decisions are made on further development in the area( where YypVX�je other than local access streets are involved. .anhassen - Feb 23, 1973 Technical Memo on Review of Buesgens Builders Office Bldg Check with IVIHD indicates that access has been acquired along TH 5 except for 33 foot at west end of parcel. Driveway would have to be adjusted accordingly unless hUID makes a concession. Confluence of internal aisles in NW corner is too close to the RAJ line to permit orderly traffic movement. Right -of -Way indicated as 501 for frontage road along the Railroad track. This is inadequate for function of road which should have at least a 341 top and provision for a sidewalkV on one side. Further discussion needed on R/Pr width requirements for various function roads. Sketch overlay indicates building could be rotated to be parallel with railroad and satisfy the requirements as I see them. Parking capacity maintained. An additional plus is building would be orientdd to the sun in a wad thAt would reduce the afternoon heat problem in the suiimer. North -South road shown on the east side of the develop- ment is also inadequate in width of proposed R/W. A width of 70 feet would be more appropriate. Additional width may be required at the intersection to accommodate future channelization. The proposed location of the frontage road intersection with the north -south road is too close to the railroad crossing for effective signalization of the railroad crosing. SCHOELL & MAOSON, INC. ENGINEERS AND SURVEYORS WILLIAM D. SCHOELL CARLISLE MADSON PHONE 938-7601 • 50 NINTH AVENUE SOUTH • HOPKINS, MINNESOTA 55343 February 23, 1973 Village of Chanhassen c/o Mr. Adolph Tessness, Administrator Box 147 Chanhassen, Minnesota 55317 Subject: Railroad Crossing in Frontier Development Park. Gentlemen: We checked by telephone with Mr. Nelson of the Minnesota Public Service Department about the above named project. He informed us that a petition made out by the Village and signed by the Council, accompanied by a map, which is enclosed, if sent to the Public Service Department would start the proceedings to have this crossing opened. The Public Service Department would contact the Railroad Company and set up a hearing date on this matter. He assured us that it would take a minimum time of two months to resolve this question. Your petition should be addressed as follows: FVLaska:bk enclosure State of Minnesota Public Service Department 400 State Office Building St. Paul, Minnesota 55155 Attention: Mr. Lawrence Anderson, Secretary. r u MAR RECEWED VILLAGE OF 6HANHASSEI44 MINLM n Very truly yours, SCHOELL & MADSON, INC. SCHOOL i R CE S Tb A7 i VLLLAGE FALL ire- A ..... . ..... PROPOSED CROSSING r • S 7-4 r,, 7A E Scale 1" = 400' �� a y Lj, >1 L nTi I zi 01 JI STREET 14.4. W A Zu TO .APPR. -1650' 1% a VILLAGE OF CHANHASSEN MINNESOTA PROPOSED CROSSING CHICAGO, MILWAUKEE, ST PAUL, a PACIFIC RAILROAD SCHOELL a MADSON INC. Engineers & Surveyors • Hopkins, Minnesota February 23, 1973 SCHOOL ! "w ti+ 1 1f VU..L AGS' HALL Z�+ o i jw w 78TH STREET F i O f I j E APRR-1-1,1650 Scale I = 400' VILLAGE OF CHANHASSEN MINNESOTA PROPOSED CROSSING CHICAGO, MILWAUKEE, ST. PAUL, & PACIFIC RAILROAD SCHOELL & MADSON INC. Engineers & Surveyors • Hopkins, . Minnesota Kr February 23, 1973 VILLAGE OF C HANHAS SE N CARVER AND HENNEPIN COUNTIES, MINNESOTA NOTICE OF PUBLIC HEARING ON PROPOSED AMENDMENT OF CHANHASSEN ZONING ORDINANCE AND COMPREHENSIVE MUNICIPAL PLAN CENTRAL BUSINESS DISTRICT NOTICE IS HEREBY GIVEN That the Planning Commission of the Village of Chanhassen, Minnesota, will meet on Tuesday, the 13th day of March, 1973, at 7:30 p.m. , at the Village Hall in said Village for the purpose of holding a public hearing on the proposed amendment of the Chanhassen Zoning Ordinance as follows: 1. To consider the adoption of Section 13, Central Business District, as an amendment to the Chanhassen Zoning Ordinance, and 2. To rezone as the Central Business District, under said proposed Section 13, those tracts or parcels of land which lie within the boundaries of the area designated as "Central Business District" as shown on that certain map dated February 15, 1973, marked Exhibit A, and published herewith. NOTICE IS FURTHER GIVEN That the Planning Commission will meet at the same time and place for the purpose of holding a public hearing on the pro- posed amendment of the Comprehensive Municipal Plan to include therein a district to be known as the "Central Business District" and involving the above described tracts or parcels of land. Said public hearings shall be consolidated as one hearing. A copy of the proposed Section 13, Central Business District, is available for inspection at the Village Hall. All persons interested may appear and be heard at said time and place. Dated: February 1,Z_, 1973. BY ORDER OF THE PLANNING COMMISSION Cl k-Administrator Publish February 22, 1973 in the Carver County Sun t VILLAGE OF CHANHASSEN CARVER AND HENNEPIN COUNTIES MINNESOTA NOTICE OF PUBLIC HEARING ON PROPOSED AMENDMENT OF CHANHASSEN ZONING ORDINANCE AND COMPREHENSIVE MUNICIPAL PLAN CENTRAL BUSINESS DISTRICT NOTICE IS HEREBY GIVEN That the Planning Commission of the Village of Chanhassen, Minnesotav will meet on Tuesday, the 13th day of March, 1973, at 7:30 p.m., at the Village Hall of said Village for the purpose of holding a public hearing on the proposed amendment of the Chanhassen Zoning Ordinance as follows: 1. To consider the adoption of Section 13, Central Business District, as an amendment to the Chanhassen Zoning Ordinance, and 2. To rezone as the Central Business District, under said proposed Section 13, those tracts or parcels of land which lie within the boundaries of the area designated as "Central Business District" as shown on that certain map dated February 15, 1973, marked Exhibit A, and published herewith. NOTICE IS FURTHER GIVEN That the Planning Commmission will meet at the same time and place for the purpose of holding a public hearing on the proposed amendment of the Comprehensive Municipal Plan to include therein a district to be known as the "Central Business District" and involving the above described tracts or parcels of land. Said public hearings shall be consolidated as one hearing. A copy of the proposed Section 13, Central Business District, is available for inspection at the Village Hall. All persons interested may appear and be heard at said time and place. BY ORDER OF THE PLANNING COMMISSION Adolph Tessness, Clerk -Administrator Dated: February 12, 1973 Published February 22, 1973 in the Carver County Sun. RUSSELL H. LARSON ATTORNEY AT LAW IJOO FIRST NATIONAL BANK BUILDING MINNEAPOLIS, MINNESOTA 55402 February 9, 1973 Mr. Adolph Tessness, Clerk -Administrator Box 147 Chanhassen, Minnesota 55317 Re: Central Business District Dear Adolph, TELEPHONE 335--95G5 Attached please find Notice of Public Hearing on the proposed amendment of the Chanhassen Zoning Ordinance and Comprehensive Municipal Plan to incorporate the Central Business District into the plan and to amend the Zoning Ordinance to include new Section 13, Central Business District. Please arrange to have the notice published not less than 10 days nor more than 30 days prior to the date of hearing on March 13, 1973. The attached map showing the Central Business District should be reduced in size and published as Exhibit "A" with the notice. In addition to published notice, mailed notice of the hearing must be given to the following: a. All land owners within the proposed Central Business District as shown on the map, making necessary ownership corrections where indicated. b. All land owners within 200 feet of the boundary of the proposed Central Business District. As you will note, the map does not reflect, in all instances, the current owners of the parcels within and outside of the district, and care will have to be taken to ascertain these parties. I note, for example, that the Loretta Kelm ownership is not shown on the map. Within the next few days I shall furnish you with a proposed draft of Section 13, Central Business District, in order that it will be available for inspection at the Village Hall. 6 p 0 Russell H. Larson RHL:b Chanhassen Village Attorney cc Council Members; Carl R. Dale !� J916d14 Il p 1 i �� '! 2 .5 . 6i �� �. October 1972 RECEI� 3, LO CNAN:iq: sEN' MINN. Mr. Adolph Tessness Village Clerk -Administrator Village of Chanhassen Chanhassen, Minnesota Dear Mr. Tessness: At the regular monthly meeting of the Chanhassen Chamber of Commerce held on September 26, 1972, the Chamber unanimously approved a resolution endorsing the basic concept of the plan for the Central Business District of Chanhassen prepared by Design Planning Associates, Inc., and which was presented in detail to the Chamber at a meeting on May 31, 1972. Very truly yours, C. M. Schneider Secretary 127ME W VDAMSHOVAL 04PDESIGN PLANNING ASSOCIATES, INC. GENTLEMEN: WE ARE SENDING YOU Attached Under separate cover via_— ----the following: Shop drawings Prints Reports Specifications Originals Sepias COPY TO: TES, INC. If enclosures are not as noted, kindly notify us at once. VILLAGE OF CHANHASSEN Central Business District Study Gen.eralized Guide Plan Updating August, 197.2 DESIGN PLANNING ASSOCIATES, INC. Planning, Arthitecture,-Graphics 4826 Chicago Avenue Minneapolis, Minnesota 55417. Page INTRODUCTION ........................................... 1 EXISTING CONDITIONS ......... ...................'.......^.. 1 THE CBD ENVIRONMENT........ ... 4 SUMMARY OF RENEWAL -PLAN ............. 5 LandUse ........................................... 5 Traffic and Circulation ............................... 5 Other Basic Plan Proposals 7 Policy Statement g Proposed Improvement Projects 10 PLAN IMPLEMENTATION ...................................... . '12 CONCLUSION ................................................ 14 MAPS & PLANS AERIAL PHOTO OF CBD ... 3 PRELIMINARY LAND USE PLAN 6 POTENTIAL CONCEPT PLAN 8 PROPOSED IMPROVEMENT PROJECTS ............................ 11 :a _s All INTRODUCTION The Central Business District of Chanhassen consists of the old and the new in a mixture of uses. T.his mixture _may or may not remain viable and competitive as new commercial developments occur in the future. The objective of this current study has been to determine if some type of renova- tion or change is needed to help the area realize its fullest potential. It is hoped that time principles, goals, and objectives advanced in this report will be carefully considered. The building of a better Downtown, a Downtown exciting and enjoyable to shop and work in, will require more than the cooperation and efforts of all concerned, as essential as this may be, it will also require a sensitive understanding for and development of the Concept Plan as outlined in this �- EXISTING CONDITIONS The area at present can best be described as a multi -functional area which contains public; convenience shopping, entertainment, housing, institutional, general commercial, financial, and other uses which combined, might be considered as the "Downtown" or "Central Business District". It is a mixture of the old and the new which as resulted in several problems of concern. Some major observations concerning the area are as follows: a) Due to certain structural and environmental deficiencies, the competitive ability of the area could be threatened by new commercial developments in the community. Further deterioration could result and "urban blight" could be a problem for the entire commi,unit.y as well as the immediate and adjacent areas. b) The entrances to the area'are not especially attractive nor do they provide a proper "image" or identification impression. c) Many parking areas and access drives are ill-defined and lack curb and gutter. d) There is a general lack of suitable landscaping and screening between incompatible land uses. e) Certain older areas are almost totally.uninviting to pedestri- ans; contain improper mixtures of uses, and contain exterior storage and land uses not conducive to a "shopping" area. f) Business, advertising, and identification signs should be coordinated. -1- a b) The entrances to the area are not especially attractive nor do they provide a proper "image" or identification impression. c) Many parking areas and access drives are ill-defined and lack curb and gutter. d) There is a general lack of suitable landscaping and screening between incompatible land uses. e) Certain older areas are almost totally uninviting to pedestri- ans; contain improper mixtures of uses, and contain exterior storage and land uses not conducive to a "shopping" area. f) Business, advertising, and identification signs should be coordinated. g) The general "image" of the area'one of being an "old" commercial district reflecting a lack of community growth rather than response to a suburban growth situation. h) While the Frontier development area is good, its environmental setting is not complimentary nor is it likely that the surround- ing businesses share the traffic generated to the fullest extent possible. i) Parking is a problem during certain hours and days of the week. j) There are no poles of interest which would tend to create pedestrian circulation throughout the area and thus increase impulse buying and "shopper" trips. The following environmental factors were considered as important in the evaluation of the Downtown environmental situation: a) Overall visual impression of buildings and property, i.e. degree of cleanliness or litter, how well maintained or unkept, were all considered b) Sounds, i.e. these can range from pleasing sounds such as church bells or fog horns to irritating and harsh sounds like loud mufflers or factory noises c) Smoke, dust, smog, and stench as they affect the environment. d) Traffic congestion, inadequate parking, and improper land uses were also considered in an environmental context in addition to their affect .on the development of a Downtown .Plan e) Green Spaces f) Structures in sound, deteriorating, or dilapidated state of condition. The aerial photograph on the following page shows the core of the Central Business District as it. exists today. For identification purposes the major streets and the Frontier complex have been identified. -2- a THE CBD ENVIRONMENT It is proposed that an organized, well -planned Downtown be established to maximize shopper/visitor convenience/interest and minimize traffic/pedestrian conflicts. This will require: a} Street and parking improvements on an area -wide basis. b) The development of a uniform easily understandable system of directional graphics for Downtown. Too often visitors become confused and disorientated when visiting a strange town which leads to disappointment and frustration and an unwilling- ness to return. Indicating clearly to visitors where parking, shops, and entertainment are located, provides visitors with an incentive to stop, shop and return in the future. While the revised street system should help considerably to move traffic to its destination, an improved street layout will not do it -alone and consequently a uniform system of signing/ banners/etc. is advised. c) Creation of an environment conducive to attracting "shoppers" in larger 'numbers. Shoppers are persons who purchase several items taking an hour or more of time as contrasted to the quick stop convenience item purchaser. This is done primarily by appealing to shopping desires of women; some of the methods proposed are: 1. Creation of an atmosphere in which it is "fun" to shop and which creates a desire to become a pedestrian in the area. 2. Elimination, to the extent possible, all evidence of deterioration, ugliness, dirt and grime, inconveniences, hazards, and the like. 3. Creation of shopper conveniences, all weather protection, convenient and ample parking, attractive street furniture, : smooth vehicular and pedestrian traffic flow, available rest rooms, attractive rest areas, landscaping, and similar amenities and conveniences.. It is proposed that an architectural theme be adopted and enforced to capture and maintain the historical charm of the area. Contemporary architecture in many cases cannot be compatible with the existing character of Downtown,no.r can it hope to create an environment competitive with that of coordinated new shopping center developments. d) It is proposed that several areas be cleared of existing structures to make way for new uses and buildings. This would be "selective" clearance of comparatively small areas and this maybe done by private or public interests. It.is recommended that the Village buy and clear land for new development.only if private enterprise does not respond to the Plan proposals. It is the intent here to create confidence in the future of Downtown so as to promote added private investments with a minimal amount of public direction and financial participation. -4- 4 SUMMARY OF RENEWAL PLAN The basic renewal plan for the CBD is shown on the.overall Land Use Plan and the Potential Concept Plan which zeroes in on the "core area" of existing development. It is suggested that these plans "along with this report be.adopted as an official amendment to, or part of, your Official Guide Plan. The. Plan may be subject to con- siderable change as conditions warrant; however, this is considered a necessary and healthy part of the long range planning -process. The major elements of the Plan are discussed in more detail- below. Land Use The major proposals concerning land use are shown on the Preliminary Land Use Plan. The use designations follow the zoning districts as establ.ished in the present zoning ordinance, and do not deviate in any major extent from existing zoning or guide plans.. Traffic-& Circulation The major proposals concerning traffic and circulation are outlined. below.: 1) Continue and concentrate efforts in coordinating State Highway Department plans for Highway.#5. 2) Work for development of a west -bound off ramp from Highway #5 at the intersection with Great Plains Blvd. (existing Highway.101).. This would include and east -bound on ramp to Highway#5 from this same location'if at all possible. - 3) Eliminate present access from Highway #5 at Dakota Ave: on.the east edge of town. This intersection and access point`shou'ld be moved eastward to the section line or the point where the small access road does south to the Metro Sewer Board property. 4) Eliminate any access directly to Highway #5 from the under- g developed industrial south of the CBD'and railroad tracks. The desirable circulation pattern would be back n4rth, across th'e.tracks along the west side of Animal F.air to an intersection with West 78th Street. 5) Frontage roads along Highway #5 should maintain at least a 400-500 foot spacing from the proposed interchanges at'County Road 17 and new Highway 101. 6) Two new 50 foot local streets 'are suggested to allow for more intensive development of the CBD. A) One connecting West 78th St. and Chan View at the west of the existing mill. B) One in back of the Frontier Complex starting at Great Plains Blvd., continuing west and eventually swinging north to an intersection with West 78th Street. -5- Oki 7) Eliminating Laredo Drive as a collector and designating a new road immediately to the west of the Village Hall and School as this collector. 8) Traffic congestion from the dinner theater does occur during.peak hours and it is recommended that these be alleviated. Several items have been proposed as interim and long range solutions by a special Committee. None of these suggestions are in conflict with the CBD plan and a solution.is necessary for continued upgrading of the CBD. 9) Rapid or Mass Transit - Continued studies are underway in the Metropolitan area which should be kept .abreast of at all times. In respect to the CBD it is recommended that if the existing railroad right-of-way should become part of a future transit system., that the Village try to develop a transit station along this right-of-way somewhere between its intersectionwith West 78th Street at the north and Highway 45 on the south., Other Basic Plan Proposals 1. Installation of a clearly marked pedestrian path or trail meandering through the Downtown connecting various points of interest including historical aspects of the environment. 2. Improvement of all pedestrianways by installation of adequate street furniture (benches, attractive trash recepticles; ornamental street lighting, specially designed traffic signals and signs, planter boxes, and the like). Where possible, pedestrian flow should be maintained from building to building within blocks for all -weather protection. 3. While no full-scale pedestrian malls are proposed, several "mini" or "pocket" parks are recommended to add green spaces, pedestrian amenities, and utilize land in a more efficient manner. The length and severity of Minne- sota winters hinders the year -around effectiveness of ex- pensive full-scale malls, especially in case of smaller communities where the investment of such large amounts of money could be put to better uses, i.e- street furniture, planter boxes, improved lighting, etc. 4. Most block interiors could be more effectively and more fully utilized; certain areas lend themselves to interior pedestrian as well as the usual street orientation. 5. All existing alleys and open spaces between buildings s should be greatly improved to present a better appearance and be inviting to pedestrian movements. 6. Further development of the Downtown should recognize the various functions (retail, financial, general office, housing, entertainment, etc.) to avoid improper mixtures that detract from the full economic potential of'proper locations. Certain non -retail uses should be encouraged to leave the Downtown for better locations and to make room for expansion of more appropriate and intense activities. PLAN IMPLEMENTATION . A plan for. Downtown Chanhassen is of little value if it cannot or will not be implemented. To be implemented, a plan must be practical and economically feasible. Futher, there must be the desire and leadership to take the steps necessary to attain the objectives outlined in the planning program. Some basic objectives of the Downtown Plan are: a) Retain and enhance the competitive ability of commercial activities b) Remove instances of structural and environmental deterioration and blight c) Eliminate those land uses which are not compatible with a "Downtown" situation and can be located elsewhere to the mutual advantage of the Downtown and the uses relocated d) Provide room for expanding and new uses compatible with the goals of a healthy downtown. e) Provide a sound and exciting environment for shopping, .working, living, and enjoyment of leisure time f) Provide for a stronger employment and tax'base An attempt has been made to develop a practical and economically feasible plan for the development and maintenance of Downtown Chanhassen. It is suggested that primary objectives can be attained within a period of about five years provided the necessary steps are taken promptly and energetically. Some of the steps to be are as follows: a) Plan Review The Plan should be carefully reviewed by various participating and affected parties prior to any formal and official action to adopt the Plan. A period of about thirty (30) days should be allowed for review of the plan. b) Public Hearing A public hearing should be conducted on the Plan following its review. The purposes of the public hearing would be as follows: 1. Present the plan to the general public 2. Show need and justification for renewal plans and establish required evidence to support public participation. 3. Obtain public reaction, comments, and suggestions. c) Plan Modification and Adoption The Plan should be amended as may be deemed desirable following results of the public hearing. -12 - "' d) Explore Financing Methods It is not recommended that the project be a typical Federal Aid endeavor for a variety of reasons including the lack of available Federal funds, time involved, "red tape", loss of local control, and the belief that such funding is not essential nor necessary to the satisfactory attainment of the desired objectives. Rather, it is recommended that a variety of public funding methods be utilized and that considerable reliance be placed upon private initiative and resources. It may be possible, however, to utilize Federal financial aid for certain aspects of the project including public housing for the aged, flood controls, waterfront improvemtns, pedestrian amenities, and others. Certain State Aids may also be available. .There are various local financing methods available for consideration: 1. Tax Anticipation Bonding (payment of bonds from increased project tax return resulting from new development 2. Special Benefit tax districts 3. Limited mill levy for renewal purposes 4. Normal assessment practices 5. Heavy reliance upon private enterprise to accomplish major portions of the plan 6. Special Rate Rehabilitation Loans - Pooled source of loans from financial institutions e) Select Initial Projects and Set Priorities and Timetables f) Zoning The total renewal project area should be designated as a special zoning district to require a special use permi-t for all developments in the Downtown Area. A special use permit should be required for all improvements exceeding $500.00 in value for the following reasons: 1. Assure compliance with ren'ewal plan 2. Enforce architectural "theme" requirements 3. Prevent undesired developments on land scheduled for acquisition for another purpose 4. Provide for review of developments by the public and the renewal area land owners and tenants. g) Further Planning Certain planning studies must be conducted in greater detail if the renewal effort is to proceed in an efficient and coordinated manner. Special studies are needed in the follow- ing areas: -13- a 1. Individual project details 2. Road system (engineering and traffic) 3. Parking (vacancy, turnover, generation, time limits, etc.) 4. Street, sidewalk, trail design (pedestrian amenities) 5. Architectural treatment h) Relocation Certain uses may be requested to move from their present location and a few may be displaced by renewal action. It will be the responsibility of the Village to assist those displaced to find new and suitable locations. A relocation service should .be established consisting of real estate, financial, welfare, and other interests who have the necessary knowledge and ability to coordinate needed efforts. Immedi- ately begin working with service stations, lumber yards, and car dealerships to find new sites outside of the core area of the Downtown. i) Rehabilitation Many buildings, even though old shall remain but should be improved in various ways. Preferably, such design work should be commissioned by the land owners and tenants affected under general guidance of the over-all Plan concepts. j) Parking and Zoning Establish a zone in which new developments need not provide their own parking and in which, by public policy, it shall be a public responsibility to provide off-street park- ing requirements. k) Enforcement Policy Many older buildings should be remodeled or at the very least given a fresh coat of paint. The Village should establish a policy of encouraging rehabilitation by not overly enforcing building, plumbing, electrical, fire, and other codes which would render some such rehabilitation economically unsound or tend to discourage rehabilitation when expensive require- ments are enforced as provisiohs of a building permit. CONCLUSION The renewal plan is structured to obtain maximum results from a minimum of public effort, control, and expense. Public planning and coordination along with selective and limited public projects should be expected to produce renewed interest, confidence, and substantial new private investments in the Central Business District. Also, the program is structured to be of little or no cost to the average taxpayer in Chanhassen. In fact, the program is designed to produce a net tax asset to the Community as well as a pleasant environment and source of civic pride. -14- 7. The plan calls for a series of relatively small and scattered improvements rather than large scale clearance or other disruptive renewal actions. This approach can show significant results in a period of about five years with a minimum of disruption and a miximum of private investment and development. 8. Future Downtown development should be of the highest quality possible. A high quality environment will excite people to return to shop, vacation and live. An environ- ment of inferior quality will discourage tourist visits and large scale capital investments. The construction of buildings lacking in high architectural value, will only serve to produce a sterile Downtown while the build- ing of high quality structures will enhance Downtown's image and serve to set a standard of architectural excellence for later builders. 9. The careful phasing of Downtown improvement projects .so that necessary improvements and alterations are installed at the appropriate times. As an example, all storm and sanitary sewer line installations coupled with the burying of telephone and electrical service cables should be done prior to the repair of street and alley surfacing. 10. Preservation of all buildings that are structurally sound and that can be utilized in some manner. 11. Expansion of Civic Center according to a detailed, long-range plan. 12. Encouragement of high -volume sales development away from but connecting with the lower volume "specialty" shopping area. 13. Clearly separate the various functional uses and co- ordinate their relationships; by zoning, make all incompatible land uses non -conforming. 14. Create "poles of interest" that provide for parked cars, pedestrians, and shoppers for the entire area. 15. By landscaping, screening, and other plan features - reduce the visual and actual conflicts between the commercial area and nearby residential uses. 16. Utilize "strategic" parking scattered about the area in accordance with a detailed parking need survey rather than the large, typical shopping center type lots. Pol icy Statement Downtown's basic character is of a late 19th Century town and most attempts at eenovation have been in this direction. The current architectural "mood" in many new developments is Slanted toward the rustic or quaint approach and Chanhassen is in a favorable position to follow this trend. In this regard itis suggested that an official policy statement regarding architectural materials be adopted as part of this report. This would include use of rustic materials, natural woods, earth tone colors to the maximum extent possible in all future or renovated structures in the Central Business District. -9- it To maximize the effectiveness of such a policy statement.it may be desirable to include this as part of a special CBD zoning district if such is adopted or enacted in future months. (See item F under PLAN.IMPLEMENTATION.) Proposed Improvement Projects The. following plan indicates eeveral sub areas of the core area of the existing CBD that could move ahead with basic improvements -somewhat independently. Several items requiring action .'by. both public and private enterprise are indicated. The Frontier complex itself. has not been designated as an improvement area, although in actuality - it is. The basic difference is that it is controlled by one owner. However, the same degree of cooperation between both the private and public sector must exist here if the CBD is to move ahead,. -10- 4 To: John Ne MEMORANDUM CHANH V eaux, ASCha i Ian SEN From: PLANNING COMMISSION J. E. CENTRAL 7 ke, Chairman RAL BUSINESS DISTRICT PLANNING ING COMMITTEE The CentrMinutes of Cgp Committee Meeting of June 29, 1972 the al Business Committee Me en his trio Vi l lage Ha 1) (CBD) Plan tubers - J. at 7 Arnie Wing Committee met 2 Design attendance were Herb E. Mielke June Blomber Those in on 9 9n Planning Associates, 9, Harr 1e Ryba, and tendance � 1972, in Y Paule Charlie were Planning The meetin y, Roger Osmondson,an der. Proceedg consisted and ALSO in with the stud of Mr Dale's Carl Dale from was outlined in .Y and discuss' Presentation thtion I believe the his June 26 ions tributed at thechairman 1972, letter a attendee a various points of the commissi t0 the chairman This Proposed on how to June 27, 1972, PlanningCBpsed Procedure To briefly review these C mmia copy of this letter Committee. Arocedures Commission meeting, which was dis_ (1� Distribute they consist of: the ,who m y be in CePlan es ted abrochure form for ct Plan. and/or affected the Central T rev. (2� The plan by the Central1eW to all , considernthe Comm• Business CSD Commission after a village general Plan n an amen reasonable rev' (B} The guide plan, dment or addition tew eithe should shouPlan, followin fisting d be Presented en ted informally ra l to en t b (4) Following to Village Planning Co council d the ge Counc Commission, should be considered discuss ' 1. Plan to the idered by the village and briefin s be consulted PubIIc, (The village as a means public hearing Of an renewal proper Planner suggests that°f pre5enting the (5) Folio wal project Procedures t0 fo]lo the village attorney Following the such as this.) win the Presentation should be off- cia 1 l c hear - in ion y ado g or hearings (6) Specific pted by the Planning final mod' the studies should g Commission version sc ePlan such as a 1 ter then proceed on Council. d deter na to financing meth mplementat' m�nation of ads, selection Of Priorities, t initial projects, prior' tes Considerable discussion took place f by the planner. All of the people general air was one of optimism and _ equally, and following is a represeri_ (1) The street pattern propose the railroad was discussed Department might be pers u a adjacent to the Highway 5 widened. This type of c ro grade crossing where it's The current Highway 5 east -- bargaining point. (2) The overall parking plan a. with detailed parking s u r N.P-- and location of parking. owners in the plan whose lot. The planner discuss credits designed to equal overall central business land exchanges between pr also discussed. (3) Concern was expressed t h ex - - might not be strictly a n--f= side businesses moving i rz requirements in order to businesses. (4) Many views were expresse' the central business di such as bare lots wi th rz parking areas, and in d u establishments. (5) A comment was made that; central business di str ii cial development in otk-a within the village sepia trict which would tend of the present centra 7 (6) A strong interest was methods of financing S that property owners w AI cult time in arrangi r+9 or private financing s interested in partic i P was part of a study t h district plan was off conceptual plan of t h e to be presented and i n •upLd apin6 pazLLpaaua6 a44 04UL pa;PaodaoouL pup paluasaad aq o4 spaau ;pq4 4oaCoad j3La4sLp ssauLsnq LPa4uao a41 40 uel3 �pn- 4 da:)uoo aqj sl 4L awL4 SL44 4y •panoaddP R[LPLoLJIO sum up[d 40La4stp ssauLsnq LPaluao aq4 aajjP appw aq Woo 4pgj Xpn4s P 4o 4apd sPM sL44 4244 pa4PoLpuL OLUG IaPa :luauwOJ •6UL4PdLOL4aPd uL pajsaaa4UL as044 JOJ paLM ap PUP paao[dxa aq pLnogs 6uLOURULI a4PnLad ao OLLgnd aagila jo spog4aw snoLaPA-6uloupuLj 6UL6uPaap uL awL' 41no - Wtp P OAPq 4ou p[noM a;PdLoLgUPd o4 4upM oqM saauMo (4aadwd 4Pg4 os sL44 sp gons 4oaCoad 4uawdoLanapaa P gons 6ULouPULJ Jo sp044aw snOLaPn 941 uL aLdoad jo aagwnu p Xq passaadxa SUM 4saaaJUL 6Uoa4s y (g) •JOLaIsLp ssauLsnq Lpa4uao Zuasaad aqj jo g4Moa6 pauLP4sns pup paLjtun P a6panoosLp 04 pua4 p[noM goLgM 40Lu4 -sLp ssauLsnq Lpa4uaa zuasaad aqj woaj pa4papdas 06PLLln 944 uL44LM ao uassPquPga 04 4UaoPCpp aag4la sPaaP aa440 uL zuawdOLanap LPLO -aawwoo a44 4Uanaad o4 upLd ;uawdoLanapaa goLa4sLp ssauLsnq Lpa4ua3 ago Uo Mou avow o; spaau a6PLLLn uassPquPga 4pgZ appw sum 4uawwoo y (5j •s4uawgsLLgplsa LPLoaawwoo asn g6Lq o; ;uaoPCpP p04POOL Ra4snpuL Put? °spaap 6uL1apd Iona `[Llw pa@I aq4 °6ULIapd ao s6ulpLlnq ou g4LM s;oL aapq se gons uanL6 aaaM sa[dwpx3 •sIsLxa Mou Jl sP 40LJZSLp ssauLsnq Lpaluao aq4 uL441M a6psn pupL 94P69pPUL 4uaaano uo passaadxa aaaM sMaLn RUPW (t) •sassauLsnq LPLoaawwoo PUP LLPjaa aspq xPl Mau aalnbop 01 aapao uL s4uaw9aLnbaa ago anLPM 04 a6PLLLn aq4 6ULanssaad PUP uL 6uLnow sassauLsnq apls -ono plonP 04 auop aq pLnogs sLgl •paoaojua RL43la4s aq you 446lw °panoaddp sL 41 aouo °upLd ago LPULJ aqj 4Pq; passaadxa sum uaaouog W •passnosLp oste sum sasn pup[ azL[Pnba o4 saauMo Riaadoad uaaM4aq sa6upgoxa PURL p04pL;o6au jo 4daouoo aqj •40La4sLp ssauLsnq LRJIUao LLPaano aq-4 uLg4LM s4ljauaq pup asn pupL azLLpnba o4 pau6Ls9p s4lpaao pup sa6aPgo xP4 jo supaw snOLaPn passnosLp aauupLd aql •;oL 6uLlapd LLp aq o4 sapaddP R4aadoad aaL4Ua asogm uPLd aq4 ul saauMo puPL asog4 aoj passaadxa sum uaaouog •6q jj Pd jo UOL4POOL pup OZLs aadoad aulwaa40p 04 aapao uL SRanans 6uL�apd paLlp4ap 44LM MaLnaa Lnjaapo spaau 4oaCoad aga 944 10 uPLd 6ULJapd LLPaano aql (Z) •JULod 6ULULp6aeq P sp pasn aq 446Lw q;nos aq4 04 4uawasPa 5 kPM46LH 4uaaano aql •uPLd ppoa aga age uo pa4POOL k[4uasaad s,4L aaagM 6ULssoao appa6 -uo up 04 aLgpaajaad aq 446Lw 6uLssoao jo aU4 sLgl •pauapLM sL 4PMg6Lq IP44 aouo a6pLaq ppoaLLPa 5 kpMg6LH aqj 04 4uaopCpp 6uLssoao pPoa a6PgUOJJ P pLLnq 01 pappnsaad aq gg6Lw ivawgapdaa SPM46LH a44 4pg4 pa4sa66ns sum 4L pup `passnosLp sPM ppoaLLPa a44 PUP 5 kPM46LH uaaM4aq puPL aq4 aoj pasodoad uaa44Pd 4aaa4s aqj (L) :sjuawwoo aLagl Jo 4sLL anL4p4pasaadaa P sL 6ULMOLLOJ pup `RLLPnba pa4PdLOLjaPd a3UPpua44P UL LLb •4uawa6Pano3ua pup wslwl�do Jo auo SUM aLP LPa9u96 aql pup RLaaa4 pa4PdL3L4uPd aoUPpua14P uL aLdoad aq4 jo LLb •aauupLd aql Xq saanp000ad as944 Jo UOL4Pluasaad 944 6uLMOLLOJ aOPLd loot UOLssnosLp a[gPaaplsuoa -Z- A . - J u i Ina. ZI_rm �-e - -r — , =r• — - — 7. �,R - - .} i�;. -- - -3- (7) It was suggested that significant geographical features currently in existence in Chanhassen should be included and clearly labeled on the planning map so that people reviewing the CBD plan maps can easily relate them to the current village layout. As a summary to this meeting, Mr. Dale reviewed some of the various financing techniques used in other villages that he has been associated with as a planner. He indicated, though, that any taxing or financing techniques used should be worked out in a series of public hearings once the overall concept plan is approved. These financing techniques could include tax anticipation bonding, limited mill1evies designated for renewal land owners, special benefit tax districts, and even federal financing. The planner also made a strong recom- mendation to those present that if the plan is to work, it will require strong backing by the business leaders in the community. He suggested that a list of businessmen who support the plan should be prepared for use prior to the public hearing. The CBD committee members at this meeting then verbally indicated that Mr. Dale should proceed with work on the CBD brochure so that it might be reviewed by the Planning Commission. JEMielke jk 7-10-72 z 4826 Chicagc Averse So. Minneapolis, Minnesota 55417 Phone: (612) 822-2106 MEMORANDUM June 26, 1972 To: Jim Mielke, Chairman Central Business District Committee From: Design Planning Associates, Inc. Subject: Procedures for Implementing Downtown Plan Generally, a step-by-step, action program produces the best results provided all the steps are covered. This approach seems to work in that it results in attaining a series of separate objectives, all of which lead to the ultimate goal. We have tentatively set aside Thursday night to meet with your group should you so desire as we discussed by telephone. If meeting is set, please inform me of the time and place. The basic steps to be taken are generally outlined in our report to you dated May, 1972. We would suggest the following steps be taken to generally aim at the total package: 1. Distribute the plan for general review by all who may be interested and/or affected. This would include the merchants, land owners, civic groups, Highway Department, Village Council, and others. (A map version of reduced scale should accompany our report to graphically illustrate the ideas presented.) 2. Following a reasonable review period, the Planning Commission should consider the plan as an amendment or addition to the existing Village Plan. Following general agreement to a plan by the Planning Commission, it should be presented informally to the Village Council and discussed with them. 3. Following Council briefing, a public hearing should be scheduled to present the plan to the public. The Village Attorney should be consulted as to the procedures since there is considerable doubt in my mind as to the legal requirements in this type of case where we may or may not proceed under Statutes governing "urban renewal projects" as such. Even the legal procedures for amending or adding to a Village Plan are not clear to me. The question is primarily one of determining if the public hearing should be conducted by the Planning Commission or Village Council. 4. Following the public hearing, the current plan or modified version should be officially adopted by the Planning Commission and Council. 5. Study should then proceed on the following: a) Alternative financing methods. b) Selection of initial projects, setting of priorities, and timetables for further steps to be taken. -2- I April 3,1972 MEMORANDUM TO: Chanhassen Planning Commission FROM: Dan Herbst SUBJ: Central Business District On March 28th, 1972 at the regular Planning Commission we spent some time discussing our central business district study with our planner David Nelson. After this meeting a thought occurred to me relative to a future consideration for housing the aged in Chanhassen. Initially it seems to be somewhat counterproductive to talk about housing in a central business district, but Chanhassen has some unique character- istics which may lend itself to planning for housing for senior citizens within the central business district itself or on the periphery of the district. During the morning hours in Chanhassen the senior citizens of our community are most evident, They can be seen walking on our sidewalks to early morning church services, going to the pharmacy, grocery store, laundromat and going into Paull.y's or Jerry's for an early libation. In a way, our community with its still unique small town business core is extremely convenient for these people. In David Nelson's memo of March 28, 1972 he makes reference to the old Village Hall and the parking space surrounding this building. I am not familiar with the size of this parcel but a consideration might be given to exchanging this property for some property on the peripheral of the CBD for property which could be used for housing the aged. I have enclosed some copies of a Metropolitan Council Housing Report from last fall which places some emphasis on the needs of housing the aged. It also indicates on page 2 of this report that Hopkins has established an architectural review committee to evaluate new construction. The CBD committee may have some interest in determining how this committee functions. In December of 1971 the Metropolitan Council also completed a detailed report on Municipal Housing Profile. I have xeroxed the figures relative to the housing data for the Metro area and specifically for the housing data as it relates to Chanhassen. I believe Adolf would have a copy of this housing report if anyone was interested in studying it in more detail. If not, I have a copy which I would be happy to lend out. .)ESIGN, PLANNING ASSOCIATES, INC. 4826 Chicago Avenue So. Minneapolis, Minnesota 55417 Phone: f612) 822-2106 February 16, 1972 Mr. Adolph Tessness P.O. Box 147 Chanhassen, Minnesota Dear Adolph: Please find enclosed two base map has been expanded to go as Chanhassen line. The plan of from the half section maps and it if you could take a look at corrections or additions. If be helpful if you could write establishments also. C�� maps on the CBD Study. The large far east as the Eden Prairie/ the heart of the CBD was compiled aerial mosaics. I would appreciate it and see if there are any so just mark them in red. It would in the names of the existing As far as general work goes, I'm having lunch today at my office with Eden Prairie's planner, and next week Mr. Wittenberg from Nason's office is coming over to leave any of their maps and background material with us. We'll be looking forward to receiving the marked up half section maps from you in the Red Cedar Point Study also. Sincerely, ;DJIVfiPLANNING SSOCIATES, INC. /lIY ■4. David Lee Nelson, AIA Planner DLN:gd Enclosures rI i 1 A '• • Y• , • CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA ORDINANCE NO. 47 -A AN ORDINANCE AMENDING SECTIONS 19. 10(1) , and 19. 16(1) , OF THE CHANHASSEN ZONING ORDINANCE AND ADDING THERETO SECTIONS 10.10(1) , 12. 12(1) , 13, 19.18, 19.19, 23.06(5) and z3,10. THE CITY COUNCIL OF CHANHASSEN ORDAINS: S£;CTION 1. Sections 19. 10(1) , and 19. 16(1) , of Ordinanco No. 47 entitled, "i' :; Chanhassen 'Zoning Ordinance", adopted February 8, 1972, are hereby amend--d to read as follows: Section 19 . 10 MovinQ , Alteration or Wreckinn of Structures. 1. Buildings or structures moved into or witiAn tnu City ;:shall comply with the provisions of this ordinance and the Chanhassen Building Code for new buildings or structures . A permit shall be required to rnov-- buildings or structures into the City, and any such permit may prescribe conditions and restrictions regulating any such move. Section 19.16 Outside Storage in Residential Districts. 1. The outside storage of recreational equipment is prot.iuit-:i in front and side yards in all residential zoning districts; except If the rear yard of a zoning lot is inaccessibla or physically unsuitubl: , suca storage may be permitted in one side yard only of said zoning lot As as practicable to the side of the principal structure on said lot; providl -d further, that any such side yard storage area shall not be adjacent tc u street. Not permitted for storage by tnis section are vehicles and ational equipment not originally constructed for recreational use. a. For the purposes of this ordinance, recreational equipment shell include the following: (1) (2) (3) (4) Boats and canoes Snowmobiles All terrain vehicles Trailers for the transportation of the above All motor vehiclips , either self-propelled or gapable of being towed and designed, con- structed, Qr usod to provide temporary, movable living quarters for recreational use. f ' 4 �ss4.w }, t01 x i Y '�� Sd�.J.RG 7{;��17°:8�q r��», l,yi"` „�r•� �.• Fl 4` ji'�.�1'!.^"..yA ' �. f SECTION 2= Secti.ons 10.10, j2.12, 19 $tad 23 of ordinance No. 47 eratitir:d, "The Chanhassen Zoning Ordinance" , adopted February 8, 1974, µre hereby amended by adding thereto the following subsections to read as follows: Section 10. 10 Boundaries of the C-2 Commercial District, The boundaries of the 0-4 Commercial pistrict shall includi� t1aa following described tracts and parcels of land: 1. The Northerly 420 feet of the Westerly 10 acres of t.q,:A part of the Northwest Quarter of the Nortnwest Quarter lying North of the Northwesterly right-of-way line of the Chicago, Milwaukee, St. Paul & Pacific, Railroad Company and South of the South line of County Roud No. 16, in Section 13, Township 116, Range 23 West, Carver County, Minnesota. Section 12, 112 3oundaries of the I-1 industrial District. Tha boundaries of the I-1 Industrial District shall include the following described tracts and parcels of land; 1 , The Southerly 480 feet of the Westerly 10 acres of triut part of the Northwest Quarter of the Northwest Quarter lying Norte of ::e Nortnwastdrly right-of-way line of the Chicago, Milwaukee, St. PaLl & Pacific Railroad Company and South of the South line of County Roan No. 16, in Section 13, Township 116, Range 23 West, Carver County, Minnesota. Section 19, 18 Deposit for Costs. Prior to consideration by the Council, Planning Coniinission, any City official of an application for a variance, conditiunal use rezoning, or any determination relevant to trio administration, or eazforcement of this ordinance, the Zoning Administrator may requir,:. t.: applicant to deposit with the Pity funds estimated by the Zoning A�::;►::�is- trator to be sufficient to defray all City expense in processing said application', including, but without limitation to, City staff administr4tior, costs, and engineering, ploaOing, legal, and soil consultants' fees. Any balance of said deposit remaining after completion of procaedings cn the application shall be rQfypdpd to to� applicant. Section 19.19 Rszonina and Conditional tJse Notices. Notwithstanding oriy pp%pp on of this ordinance to the contrary, notice of public heari4q.$ 9;1 r#pontIng.apd conditional usa applioatio+ls shall be mailed at 1*,aAt ten, (j.0)'"+daY gfore the cloy of �nY such h Grinq 4. Proximity Factor Z Establish two or three zones based upon distance from the parking lot. Individual Assessment z = hi (by zone) area of land in square feet = dollar assessment for each square foot (different value for each zone: example, Zone 1 - 65�, Zone 2 - 20�, and Zone 3 - 5�)* * Zone values are variable depending on size of districts and physical characteristics of the total CBD. The important fact in utilizing the assessment formula is to realize that it involves a reverse mathematical procedure wherein P (Total project cost) must be established first. Then the total factors can be determined by taking the proper percentages of total P. o C O u v c t/1 > J v O () c 4) c +- _ •c Z w • v U — a W O c w v c s c 0 a _0t •c L c a O CD O ; a a N> p •N w Z m -0 U- p U v 4- C N " c U cu > Q O CL .� 44) 0) CL 'a ) v .c v, L o 0 0 3 L ❑ o p 4)0 ./.., 0)>' a a o N E N s =a v v 'Q, N t% = ii v, c ce CAC c L v v_ v a L L u j ..0 N S C a O E a)— o •`o `� m •v �c f a, v ° �' s o 0 > E -a (uui 3 f= •- c y- •a v u ; c .N •L C d a � i 4) QJ >. •C • Q) v N� o .= c v c f v u .c •rn } € C •c - o a U v`-C •u � a o s c c U o aa) .- E t► aci a� 'N s -o c ) o ° .N a O` `a W a u 3 " a) -0 C �' a� a a 'L a) c c v N" Q v v s L L a''' L o� > in a s rn v •L o Q- m >. v c o e o •v 3 p� o v v a 4__ .c o o_ •y v •� s o N y 0 a N "" o y yL L a rn u ou c-0 o s °n a C `v �0 d C 3 v -a 0 0 u O) s a) - c .� v v Z w L W a a °% o c °' a '� s -v a u o 0 0 `� o .c '� w-C v m (U CL 0c 3 '^ w C >` O v c �. E c v v a >. a° O_ a) s -p c rn o C u L= t Q} w v a a s L 3 a i } O C` �c i; c a c Q N 'L v u`_ U` O �^ 3L ;^ C .... u v "- _L = c d -C -` •L "a v 4) v u p a 4- C v-0 . E a i 4) �- v C v 3 0 �► Lc L a i n y v •C u a y c ,0 L o a v a o u a 'c v L Q 0 cu u N E o y v) c y rn C (D N Z E ° c O E ,c 4) 4) 0 F 0 N L > — C �- v o O N c u > a/ a ._ E y E a o �, o w �_ E -0 v v v O O 0 L 7 s a O C 'A O Cp L _ C O L a N ' C Q y -0 o v a U- c) '^ u '� c •E o N `^ C a LL •c N v Q •_ N N L y •_ � } ❑ C u a t y CL E •_ C fy 4) -Y •_ (u L a •- N s ._ x M > . _ . y _ 'y C 4) a U a CL °) L y a ._ a n. o N 0 v y c �- O 0 N o .- 0 C� N LLJ Q A 0 .- Z 4) C — N a z L N E -o '^ O c v u Z y o u c v LA v_ c o f >. c._ c c •v N %n N Z O a O L LA v u _ ° a) 0 a v `° 00 n ul c— aui y C O +- ,. a. E 4) o a v v x "' c u. L Q c c v c a rn — •- c rn c O c) a y c u •- a ._ a o ._ o a o v a a� s o a o, L 3 - o a° c> c L s ._ Q ._ c -Cv N Q. a v a C Of N L Z C 1 -e..iFry PROPOSED AMENDMENT TO VILLAGE OF CHANHASSEN ZONING REGULATIONS Add the following: "CENTRAL BUSINESS DISTRICT" For scussion Purposes Only - A. Definition: The Central Business District is that geographic area included in the General Redevelopment Concept Plan for the Central area as approved by resolution of the Village Council on the __day of ,1972. B. Purpose: The purposes of these regulations are as follows: 1. To help assure that all uses, new development and construction, building and site rehabilitation, remodeling, property access, parking, and pedestrian circulation are in conformity to the Comprehensive Municipal Plan and the Central Business District Redevelopment Plan. 2. To help develop and maintain the Central Business District as an economic, social, and physical asset to the entire Village. 3. To recognize the unique and special problems of the Area not common to new commercial areas such as shopping centers. 4. To help coordinate all private and public development activities in a manner consistent with plan and redevelopment objectives. 5. To provide an opportunity for all land owners and tenants to be aware of and comment upon all significant activities and development which may collectively affect the well-being of the area as a whole. C. Regulations 1. The Central Business District zoning regulations are in addition to rather than in lieu of the regular Zoning District(s) except as modified herein. 2. The following shall require a Special Use Permit;: a) All new construction requiring a building permit and exceeding $500.00 in Value. b) All exterior rehabilitation of buildings except normal maintenance. c) All public improvements. d) All site changes such as access drives, parking arrange- ments, landscaping, and similar changes. � AN- � 11� a e) All new signs (business, advertising, identification, directional, or other permanent signs). f) Such other activities as determined by the Zoning Administrator which may affect the Central Business District Redevelopment Plan. 3. The following items shall not require a Special Use Permit: a) Interior remodeling except those requiring structural changes and those involving a new entrance or exit for the building involved. b) Activities which, as determined by the Zoning Administrator, have no significant affect upon the Redevelopment Plan objectives. 4. Normal building setback, height, use, parking, sign, and other regular conditions and restrictions contained in the Zoning Regulations may be waived by the Village Council if such waiver is found to be consistent with goals and objectives of the Comprehensive Municipal Plan and the Central Business District Redevelopment Plan. 5. In granting a Special Use Permit, the Village Council may impose conditions and restrictions as deemed necessary. The Council may grant special use permits if such permits are considered consistent with the Village's goals and policies for development and maintenance of the Central Business District. Procedures 1. The applicant for a Special Use Permit shall fill out a form from the Zoning Administrator and submit such site and/or building plans as requested. There shall be no fee charged for such application. 2. The application and required plans shall immediately Ibe forwarded to the Village Planning Commission, Village Administra- tor, and the Housing and Redevelopment Authority for review. The Clerk shall schedule a public hearing on the application to be held by the Planning Commission at the earliest possible date. 3. Following the public hearing, the Planning Commission shall forward its comments, suggestions, and recommendations to the Village Council for final action. 4. The Village Council may grant, deny, or modify the Special Use Permit and impose such conditions and/or restrictions as deemed necessary.