Loading...
25-02 CC Packet Final PlatCity Council Item May 19, 2025 Item Approve the Final Plat and Development Contract for Pleasant View Pointe File No.Planning Case #2025-02 Item No: D.5 Agenda Section CONSENT AGENDA Prepared By Rachel Arsenault, Associate Planner Reviewed By Laurie Hokkanen SUGGESTED ACTION “The Chanhassen City Council approves the requested final plat and development contract for the subdivision on Pleasant View Road subject to the conditions of approval and adopts the attached Findings of Fact and Decision.” Motion Type Simple Majority Vote of members present Strategic Priority Development & Redevelopment SUMMARY The Applicant is proposing the subdivision of 13.65 acres of properties, zoned Single-Family Residential and guided for Low-Density Residential into twenty lots. BACKGROUND This proposed development was previously reviewed and approved by City Council on March 24, 2025, for the preliminary plat, wetland alteration permit, and land disturbance & tree removal contract. Within the Development Contract, the City is providing credits for development fees in exchange for specific public improvements beyond what the development would have otherwise is constructed. These improvements include reconstructing portions of Peaceful Lane and Nez Perce Drive. As construction plans are updated based on staff review, the costs associated with those additional improvements are subject to change, and the amounts listed in the Development Contract will be 291 updated by staff before recording of the Development Contract. DISCUSSION BUDGET RECOMMENDATION Staff recommends approving the final plat and development contract subject to the conditions of approval and adopts the attached Findings of Fact and Decision. ATTACHMENTS Final Plat - Pleasant View Pointe Development Rendering Final Plat - Complete Plan Set Final Plat Application Narrative Findings of Fact Final Plat Staff Report Development Contract 292 C.R. DOC. NO PLAT FILE NO. www.alliant-inc.com Sheet 1 of 3 Sheets PLEASANT VIEW POINTE KNOW ALL PERSONS BY THESE PRESENTS: That Rachel Development, Inc., a Minnesota corporation, owner of the following described property, situated in the County of Carver, State of Minnesota, to wit: All of Lot 1 and that part of Lot 2, Block 3, "Vineland Forest", Carver County, Minnesota, lying Northerly of a line drawn from a point on the East line of said Lot 2 a distance of 53.53 feet North of the Southeast corner of said Lot 2 to a point on the West line of said Lot 2 distant 66.00 feet North of the Southwest corner of said Lot 2 and there terminating. AND That part of Lots 5 and 6, “Vineland”, described as follows: Commencing at the southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the south line of said Lot 5, a distance of 168.62 feet to the actual point of beginning of the tract of land to be herein described; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East 129.57 feet; thence South 89 degrees 16 minutes 34 seconds East 160.63 feet; thence North 0 degrees 43 minutes 26 seconds East 96.01 feet to the actual point of beginning, Carver County, Minnesota. AND That part of Lots 5 and 6, "Vineland", Carver County, Minnesota, described as follows: viz: That part of the South 45.25 feet of Lot 5 and of the North 96.01 feet of Lot 6, "Vineland" lying Easterly of a line drawn perpendicular to the South line of said Lot 5 from a point on said South line distant 168.62 feet Westerly along said South line from the Southeast corner of said Lot 5. AND Lot 5, Vineland, Carver County, Minnesota, except that part thereof described as follows, viz: Commencing on the Southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the South line of said Lot 5 a distance of 168.62 feet to the actual point of beginning of the parcel being described; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East a distance of 32.57 feet, more or less, to a point on the South line of said Lot 5 (hereinafter referred to as “Point A”); thence Easterly along the South line of said Lot 5 to the point of beginning. AND Lot 6, Vineland, Carver County, Minnesota, except that part thereof described as follows, viz: Commencing at the Northeast corner of said Lot 6, thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the North line of said Lot 6, a distance of 168.62 feet to the actual point of beginning of the land to be described; thence South 0 degrees 43 minutes 26 seconds West a distance of 96.01 feet; thence North 89 degrees 16 minutes 34 seconds West a distance of 160.63 feet; thence North 7 degrees 25 minutes 34 seconds West a distance of 97.00 feet to the North line of said Lot 6; thence Easterly along the said North line of Lot 6 to the point of beginning. Excepting from said Lot 5 and said Lot 6 the following described premises: That part of the South 45.25 feet of Lot 5 and of the North 96.01 feet of Lot 6, “Vineland” lying Easterly of a line drawn perpendicular to the South line of said Lot 5 from a point on said South line distance 168.62 feet Westerly along said South line from the Southeast corner of said Lot 5. AND Lot 7, Vineland, Carver County, Minnesota, except that part of said Lot 7 described as follows, viz: Commencing at the Southwest corner of Lot 7, Vineland; thence North 1 degree 53 minutes 49 seconds East a distance of 76.37 feet to a point on the Southeasterly line of Peaceful Lane; thence North 36 degrees 53 minutes 34 seconds East along said Southeasterly line of Peaceful Lane a distance of 174.79 feet; thence South 87 degrees 50 minutes 55 seconds East a distance of 294.35 feet; thence South 1 degree 03 minutes 23 seconds West a distance of 220.04 feet to the Southerly line of said Lot 7; thence South 87 degrees 50 minutes 55 seconds West along said Southerly line of Lot 7 a distance of 397.82 feet to the point of beginning. AND Outlot A, Troendle Addition, Carver County, Minnesota. AND That part of vacated Nez Perce Drive per Doc. No. 139301. AND That part of the east half of vacated Peaceful Lane described as follows: A strip of land 33.00 feet in width northwesterly and westerly of and adjoining Lots 5, 6, and 7, VINELAND and lying between a line drawn at right angles to the west line of said Lot 5 distant 388.56 feet southwesterly of the northwest corner of said Lot 5 and the following described line: Commencing at the southwest corner of said Lot 7, VINELAND; thence North 1 degree 53 minutes 49 seconds East a distance of 76.37 feet to a point on the southeasterly line of Peaceful Lane; thence North 36 degrees 53 minutes 34 seconds East along said southeasterly line of Peaceful Lane a distance of 174.79 feet to the point of beginning; thence northwesterly, at right angles to said southeasterly line of Peaceful Lane, a distance of 33.00 feet, and said line there terminating. AND That part of vacated Peaceful Lane and Pleasant View Road lying easterly and southerly of the following described line: Commencing at a point on the west line of Lot 5, VINELAND distant 388.56 feet southwesterly of the northwest corner of said Lot 5; thence North 18 degrees 18 minutes 28 seconds East, along the said west line, 107.79 feet to the point of beginning; thence northerly 244.35 feet along a non-tangential curve concave to the west, radius 1070.00 feet, central angle 13 degrees 05 minutes 04 seconds, and the chord of said curve bears North 11 degrees 00 minutes 49 seconds East; thence northeasterly 76.16 feet to a point on the north line of said Lot 5 distant 29.52 feet east of said northwest corner, and said line there terminating. Has caused the same to be surveyed and platted as PLEASANT VIEW POINTE and does hereby dedicate to the public for public use the public ways and the drainage and utility easements as created by this plat. In witness whereof said Rachel Development, Inc., a Minnesota corporation, has caused these presents to be signed by its proper officer this _________ day of _____________________, 20_____. Signed: Rachel Development, Inc. Donald J. Rachel, CEO STATE OF ______________________ COUNTY OF ____________________ This instrument was acknowledged before me on _______________________________ by Donald J. Rachel, CEO of Rachel Development, Inc., a Minnesota corporation on behalf of the corporation. Printed Name Notary Public, __________________ County, Minnesota My Commission Expires __________________________ SURVEYOR'S CERTIFICATE I Daniel P. Ekrem do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this ____ day of _________________, 20_____ Daniel P. Ekrem, Licensed Land Surveyor Minnesota License No. 57366 STATE OF MINNESOTA COUNTY OF _____________________ This instrument was acknowledged before me on ____________________________ by Daniel P. Ekrem, a Licensed Land Surveyor. Printed Name Notary Public, __________________ County, Minnesota My Commission Expires __________________________ CHANHASSEN, MINNESOTA This plat of PLEASANT VIEW POINTE was approved and accepted by the City Council of the City of Chanhassen, Minnesota at a regular meeting thereof held this ______________ day of _____________________, 20______, and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2. City Council, City of Chanhassen, Minnesota By: ___________________________________________________________________ Mayor Clerk COUNTY SURVEYOR, CARVER COUNTY, MINNESOTA Pursuant to Chapter 395, Minnesota Laws of 1971, this plat has been approved this ______________ day of _____________________, 20______. Brian E. Praske, County Surveyor By: ________________________________ COUNTY AUDITOR, CARVER COUNTY, MINNESOTA I hereby certify that taxes payable in _________________ and prior years have been paid for land described on this plat. Dated this ______________ day of _____________________, 20______. Crystal Campos, County Auditor By: ________________________________ COUNTY RECORDER, CARVER COUNTY, MINNESOTA I hereby certify that this plat of PLEASANT VIEW POINTE was filed this ______________ day of _____________________, 20______, at _____ o'clock ___.M. as Document Number ___________________ . Kaaren Lewis, County Recorder By: ________________________________ 293 S89°47'13"W 315.46 N81°57'01"W 8.07 R=5 6 2 .5 4 L=81.13 8°15'4 6"S89°47'13"W 118.22 S83°48'28"W 58.88 S1°02'51"W 7.06 S83°48'28"W 147 0 2 N1°02'51"E 290.00S84°03'53" E 14 6 3 8 S1° 02'51"W 4.86 N87° 22'17"W 140.00 S1° 02'51"W 232. 41R=175.00 L=44.19 14° 28' 08" C. Brg= S59° 04' 19" E N 5 1 5 0 1 6 W 1 1 5 0 0 R=175.00 L=71. 23 23°19'16"C. Brg=N63°29'54"W S0° 47'27"W 768. 10S88°06' 51"E 379.08S0° 47'27" W 222.50S88°06' 51"E 294.35 N18°02' 55"E107. 79R=1070.00L=244. 35=13°05' 04" C.Brg=N10° 45'16"EN53° 21'59"W 33.00 N36°38' 01"E 451.80S18° 02' 55"W 145.20N71°57'05"W 33.00 N68°48'45"E 39.97 S18°02'55"W 13. 64 C.R. DOC. NO PLAT FILE NO. N SE 1/ 4 NE 1/4 SW 1/4 NW 1/4 N www. alliant-inc. com LEGEND Deed Dimension Denotes 1/ 2 inch x 18 inch iron monument set marked by license no. 57366, unless otherwise shown. Denotes monument 294 N80°07'17"W 9.42 R=100.00 L=15.66 8°58'21" S89°05'38"E 76.21 N64°5 0'3 4 E 57.22R= 1 2 0. 0 0 L 1 0 2. 02=48 4 2' 4 8" C. Br g S 4 9 3 5' 35" E R= 10 0. 0 0 L 1 4 4. 23= 82° 38' 17" S8° 41' 18" W64. 74R=300.00L=17.16=3° 16'38"S5°24' 40"W 137.43R=300.00L=49.52= 9°27'30" S4°02'50"E 177.69N25°57'10"E60.00N3 8 1 1 4 2 W 6 0 0 0 S89° 47'13" W 315.46 N81°57'01"W 8.07 R=5 62 .54 L=81.13 8°15' 4 6"S89°47'13"W 118.22 S83°48'28"W 58.88 S1°02' 51"W 7.06 S83°48' 28" W 147 0 2 N1° 02' 51" E 290. 00S84° 03' 53"E 14 6 3 8 S1°02'51"W 4.86 N87°22'17"W 140.00 S1°02'51"W 232.41R=175.00 L=44. 19 14°28' 08"C. Brg=S59° 04'19" E N 5 1 5 0 1 6 W 1 1 5 0 0 R= 175. 00 L= 71. 23 23° 19' 16" C. Brg= N63° 29' 54" W S0°47'27" W 768.10S88°06' 51"E 379.08S0° 47'27" W 222.50S88°06'51"E 294. 35 N18°02'55"E107.79S51° 50' 16"E 16.31 76.21 34.75 L 8 1.2 8 3 7°1 5'2 1 L= 115.41= 69°36' 2 7 L 9 8.81 3 9° 0 2'36"L 1 0 8.17 82 38'17"L= 18.59=3°16'38"L= 1.95 0°20'40" 115.37N30°22'43"E 15. 35 R 60.00 L =3 0 9 .82=295 °5 1 ' 0 8 "C.Brg= N8 3 ° 5 2 '4 4 "E N29°48'51"W 11.50L= 45. 40= 9° 27' 30" L= 15. 73 3° 16' 38" L= 48.67=22°18'30"34. 75 76.21 L=11.74 8°58'21"13.42 S1°02'51"W 251.94S1° 02'51" W 191. 19S10°40'37" W53.49S88° 55'00"E 118. 34N21°28' 26"W 209 74S0° 54'22" W 209.79S0°54' 22"W 352.03S0° 54'22" W 351. 85S89° 08' 24" E 184. 07 S89° 08' 24" E 275. 80 S89° 08' 24" E 333. 49 S89° 08'24" E 401. 95 N89° 09' 55" W 147. 13 S0° 47' 27"W 27.83 N52°3 0'4 0"E 1 7 5.5 1 N0°37'26" W 147.28N 5 3 4 5 3 2 W 1 7 8 3 1 S89°09'56" E 168.62 N89°13'53"W 183.13 N89°13'53"W 180.18 N89°13'53" W 170.08 190. 03 189.05112.32109.00112. 00121. 5872. 6145. 61 24. 15104. 0293. 65 57.68164.8272. 61192.40R=1070.00L=244.35= 13°05' 04"C.Brg=N10° 45'16" EN53°21'59"W 33.00 N36° 38'01" E 451. 80S18°02'55"W 145.20N71° 57'05"W 33.00 114.97110. 93110.93114. 97S83° 33'06" E 33.69 76.8738.50102.5812. 7851.0886.3510.4154. 3325.0433.4649. 29L=223.30=11° 57'25"12 3 4 5 67 1 1 1 2 3 4 5 67 8 9 10 11 12 13 2 2L=51. 70=9°06'50"25.3222. 8748.1964.12 PEACEFUL LANENEZ PERCE DRIVE 8 8 6 1 2 6 3 9 R =1 0 0 .0 0 L =4 5 .4 9 2 6 °0 3 '4 8 " L =3 4 . 12 2 6 °0 3 '4 8 "L=22.25 10°11' 54" L= 34. 61 15°51'54"R=125.00L=81.28=37°15'22" L=5.66 2°35'43"L=75.62= 34°39'39"L=93. 51=89°17'38"L 55.64 295 123 7 5 1 2 3 4 5 67 8 9 10 11 12 13 6 BLOCK 2BLOCK 2BLOCK 1 BLOCK 1 PEACEFUL LANEPEACEFUL LANE4 NEZ PERCE DRIVE PEACEFUL LANEFile Location: X:\ 4000320- 00\001\ 40 Design\000 Source - Design\BASE-paul.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 1: 53:39 PMKnow what's below.Call before you dig.R Dial 811FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O NCHANHASSEN, MNFINAL PLAT SUBMITTALPLEASANT VIEW POINTESITE PLAN RENDERINGwww.alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.: Drafted By: Designed By: TAS TAS 4000320 I hereby certify 296 PLEASANT VIEW RD REDMAN LANETROENDLE CIRCLENEZ PERCE DR 123 7 5 1 2 3 4 5 67 8 9 10 11 12 13 6 BLOCK 2BLOCK 2BLOCK 1 BLOCK 1 STORMWATER WETLAND/ FILTRATION NWL:994.0 100 YEAR HWL:999.86 PEACEFUL LANEPEACEFUL LANE4 NEZ PERCE DRIVE PEACEFUL LANEFILTRATION BASIN 2 100 YEAR HWL:997.95 File Location: X:\4000320- 00\ 001\40 Design\01 Sheets - Final Plat\COVER.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:15:39 PMKnow what's below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N N City Submittal 4-18-2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeCover Sheetwww.alliant-inc. com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By: Sheet of Tyler Stricherz TAS, MPR ELL 4000320- 00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota. Cover Sheet Existing Conditions Site, Lighting, & Signage Plan Grading & Drainage Plan Grading Profiles & Hold Down Details Erosion & Sediment Control Plan Sanitary Sewer & Watermain Plan Street & Storm Sewer Plan PLAN SUBMISSION/REVISION MATRIX SHEET DESCRIPTION 2025-04- 18DEVELOPER Rachel Development 4180 Napier Court NE Saint Michael, MN 55376 Email: probinson@racheldevelopment.com Contact: Paul Robinson CONSULTANT Alliant Engineering, Inc. Marquette Avenue South, Suite 700 Minneapolis, MN 55402 Phone: 612.758. 3080 Fax: 612. 758.3099 ENGINEER Tyler Stricherz License No. 61993 Email: TStricherz@alliant-inc. com SURVEYOR Dan Ekrem License No. 57366 Email: dekrem@alliant- inc. com LANDSCAPE ARCHITECT John Gronhovd License No. 59233 Email: jgronhovd@alliant- inc. com VICINITY MAP Scale: 1"=3000' N Pleasant View Pointe Chanhassen, Minnesota CONTACT LIST 0 SCALE IN FEET 50 100 200 1 27 1 1 X 27 X X X X X X X X X X X X X X X X X X X X X PROJECT LOCATION Wetland Management Plan Pond - Filtration Detail Landscaping Plan Tree Preservation Plan Tree Inventory Schedule Demolition Plan 2 Erosion & SedimentControlNotes & DetailsTree 297 1000 1010 994 10 1 0 100010161012 1010 1000 996 10041000 100010041006 9961026 1 0 2 2 10 2 0 10201022 101010201000998100610201030 1032 1036103210301030102610241020 10 1 8 10181022101610 1 4 1008 990 992 992 1048 1046 1044 10 4 2 10 4 0 10 3 8 10 3 6 1 0 3 4 1032 1030 1028 1026 102410281026 10261024 1020 1016 1012 1010 PARCEL 1 GU S83°48'28"W 147 0 2 N1°02' 51"E 290.00PARCEL 2 PARCEL 3 PARCEL 3 S88°06'51" E 294. 35 S0°47'27"W 222. 50PARCEL 4PARCEL 5S88°06'51"E379.08S0° 47'27"W 716.87N74°5 8 2 1 W 1 7 0 8 1 R= 173.13 L=36.12 11°57'12"C. Brg=N68°59'45"W R= 204. 48 L=117.26 32°51'21" C. Brg=S58°32'40"E S54° 5 4'1 9" W 58.9 3 S18°02' 55"W198.74S36°38'01"W457.20 R=223. 13 L= 22. 555° 47' 22" C. Brg= N72° 04' 40" W N74° 5 8 2 1W 1 7 0 8 1R=154. 4 8 L 17 6.77=6 5 3 3'4 5"C.Br g=S4 2 1 1'2 8"ES18°02'55"W 187.12S89°47'13" W 315.46 R=56 2 .5 4 L=81.1 3 8°15'4 6"C.Br g=S 8 6°0 4'5 4"E S83°48'28" W 58.88 S1°02'51"W 7.06 S84°03'53"E 14 6 3 8 S1° 02' 51" W 4. 86 N87° 22' 17" W 140. 00 S1°02'51"W 232. 41R=175.00 L=44.19 14°28' 08"C.Brg=S59° 04'19"E C=44.07 N 5 1 5 0 1 6 W 1 1 5 0 0 S0°47'27"W 3.06 PLEASANT VIEW RD R=175.00 L=71.23 23°19'16"C. Brg=N63°29'54"W PEACEFUL LANENEZ PERCE DRIVE TROENDLE CIRCLES89°47'13"W 118.22 PEACEFUL LANEParcel 1 All of Lot 1 and that part of Lot 2, Block 3, "Vineland Forest", Carver County, Minnesota, lying Northerly of a line drawn from a point on the East line of said Lot 2 a distance of 53.53 feet North of the Southeast corner of said Lot 2 to a point on the West line of said Lot 2 distant 66.00 feet North of the Southwest corner of said Lot 2 and there terminating.Parcel 2 That part of Lots 5 and 6, “Vineland”, described as follows: Commencing at the southeast corner of said Lot 5;thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the south line of said Lot 5, a distance of 168.62 feet to the actual point of beginning of the tract of land to be herein described; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East 129.57 feet; thence South 89 degrees 16 minutes 34 seconds East 160.63 feet; thence North 0 degrees 43 minutes 26 seconds East 96.01 feet to the actual point of beginning, Carver County, Minnesota.Together with an easement for ingress and egress over and across that part of Lot 5, “Vineland”, Carver County,Minnesota lying Westerly of the following described line:Commencing at the southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the south line of said Lot 5 a distance of 168.62 feet; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East a distance of 32.57 feet, more or less, to a point on the south line of said Lot 5, which point is the point of beginning of the line to be described; thence on a line running North 7 degrees 25 minutes 34 seconds West a distance of 160 feet, more or less, to the intersection of said line with the westerly lot line of said Lot 5, and there terminating.And That part of Lots 5 and 6, "Vineland", Carver County, Minnesota, described as follows: viz:That part of the South 45.25 feet of Lot 5 and of the North 96.01 feet of Lot 6, "Vineland" lying Easterly of a line drawn perpendicular to the South line of said Lot 5 from a point on said South line distant 168.62 feet Westerly along said South line from the Southeast corner of said Lot 5.Parcel 3 Lot 5, Vineland, Carver County, Minnesota, except that part thereof described as follows, viz: Commencing on the Southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West,assumed bearing, along the South line of said Lot 5 a distance of 168.62 feet to the actual point of beginning of the parcel being described; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East a distance of 32.57 feet, more or less, to a point on the South line of said Lot 5 (hereinafter referred to as “Point A”); thence Easterly along the South line of said Lot 5 to the point of beginning.Subject to an easement for ingress and egress and utility purposes, appurtenant to and for the benefit of the above described Exception, which said easement is described as all that part of said Lot 5, Vineland, lying Westerly of the following described line: Beginning on the South line of said Lot 5 described above as “Point A”;thence on a line running North 7 degrees 25 minutes 34 seconds West a distance of 160 feet more or less, to its intersection with the Westerly line of said Lot 5 and there terminating.Also excepting from said Lot 5 that part thereof described as follows, viz:A 50.00 foot strip of land over and across Lot 5, Vineland, Carver County, Minnesota, the centerline of said strip is described as follows:Commencing at the Northeast corner of Lot 5; thence South 00 degrees 24 minutes 03 seconds East, on an assumed bearing, along the East line of Lot 5, a distance of 380.86 feet to the point of beginning of the centerline to be described; thence Westerly, a distance of 29.21 feet along a non-tangential curve concave to the South,said curve having a radius of 198.13 feet, a central angle of 08 degrees 26 minutes 53 seconds and a chord bearing of North 71 degrees 56 minutes 25 seconds West; thence North 76 degrees 09 minutes 51 seconds West tangent to last described curve, a distance of 170.81 feet; thence Northwesterly, a distance of 124. 92 feet,along a tangential curve concave to the Northeast, said curve having a central angle of 39 degrees 52 minutes 43 seconds and a radius of 179.48 feet to a point hereinafter referred to as “Point B”; thence continue Northwesterly and Northerly along the last described curve a distance of 124.92 feet and said centerline there terminating.Also excepting, a 50.00 foot strip of land over and across said Lot 5, Vineland, the centerline of said strip is described as follows:Beginning at the above described “Point B”; thence South 53 degrees 42 minutes 49 seconds West, a distance of 100.00 feet and said centerline there terminating.Parcel 4 Lot 6, Vineland, Carver County, Minnesota, except that part thereof described as follows, viz: Commencing at the Northeast corner of said Lot 6, thence North 89 degrees 16 minutes 34 seconds West, assumed bearing,along the North line of said Lot 6, a distance of 168.62 feet to the actual point of beginning of the land to be described; thence South 0 degrees 43 minutes 26 seconds West a distance of 96.01 feet; thence North 89 degrees 16 minutes 34 seconds West a distance of 160.63 feet; thence North 7 degrees 25 minutes 34 seconds West a distance of 97.00 feet to the North line of said Lot 6; thence Easterly along the said North line of Lot 6 to the point of beginning.Excepting from said Lot 5 and said Lot 6 the following described premises:That part of the South 45.25 feet of Lot 5 and of the North 96.01 feet of Lot 6, “ Vineland” lying Easterly of a line drawn perpendicular to the South line of said Lot 5 from a point on said South line distance 168.62 feet Westerly along said South line from the Southeast corner of said Lot 5.And Lot 7, Vineland, Carver County, Minnesota, except that part of said Lot 7 described as follows, viz: Commencing at the Southwest corner of Lot 7, Vineland; thence North 1 degree 53 minutes 49 seconds East a distance of 76.37 feet to a point on the Southeasterly line of Peaceful Lane; thence North 36 degrees 53 minutes 34 seconds East along said Southeasterly line of Peaceful Lane a distance of 174.79 feet; thence South 87 degrees 50 minutes 55 seconds East a distance of 294.35 feet; thence South 1 degree 03 minutes 23 seconds West a distance of 220.04 feet to the Southerly line of said Lot 7; thence South 87 degrees 50 minutes 55 seconds West along said Southerly line of Lot 7 a distance of 397.82 feet to the point of beginning.Together with an easement appurtenant to the foregoing Parcels 2, 3 and 4 for ingress and egress over and across that part of Lot 5, Vineland, Carver County, Minnesota lying Westerly of the following described line:Commencing at the Southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the South line of said Lot 5 a distance of 168.62 feet; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East a distance of 32.57 feet, more or less, to a point on the South line of said Lot 5, which point is the point of beginning of the line to be described; thence on a line running North 7 degrees 25 minutes 34 seconds Westa distance of 160 feet, more or less, to the intersection of said line with the Westerly lot line of said Lot 5, and there terminating.Parcel 5 Outlot A, Troendle Addition, Carver County, Minnesota.All Abstract Property PROPERTY DESCRIPTION Sheet ofJOB NO.DRAWN BY:CHECKED BY:SCALEFIELD CREW:DATEDESCRIPTIONFIELD DATE:CLIENTDOCUMENTPROPERTY ADDRESSwww.alliant-inc.com Know what's below.Call before you dig.R Dial 811 0 SCALE INFEET30 60 120 N I hereby certify that this survey, plan, or report was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the state of Minnesota. Print Name Signature 12/19/2024 57366____________________________________________________________Date License Number File Location: X:\4000320-00\001\40 Design\ 00 Sheets - Preliminary\ECON.dwg Plotted By: Dan Ekrem on April 18, 2025 at 10:43:28 AMChanhassen, MN1 14000320-00RS,MS,LB7/24/ 2024Additional curb stops located along west boundaryUpdate to some MH structuresAdded water and sanitary services4/18/20254/15/20251/6/2025########RACHEL DEVELOPMENTJDT1"=60'DPEEXISTING CONDITIONSSURVEY1 ## LEGEND HOUSE DETAIL NOT TO SCALE 1.This Survey and the property description shown here on based upon information found in the commitment for title insurance prepared by DCA Title - The Title Team as agent for Old Republic National Title Insurance Company file no. DC240228, dated January 9, 2024 2.The basis of bearings is assumed.3.All distances are in feet.4. The locations of existing public utilities on or serving the property are depicted based on Gopher State One Call Ticket No. 241563124 & 241563143, available city maps, records and observed evidence locations. Lacking excavation, underground utility locations may not be exact. Verify critical utilities prior 298 10' TAIL 10' ESMT ALLIANT MODIFIED 10' ESMT ALLIANT MODIFIED 10' ESMT ALLIANT MODIFIED File Location: X:\4000320-00\001\40 Design\01 Sheets - Final Plat\DETAILS.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:15:53 PMFOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N www. alliant- inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By:Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by meorunder 299 File Location: X:\4000320-00\001\40 Design\01 Sheets - Final Plat\DETAILS.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:16:01 PMFOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N www. alliant- inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By:Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by meorunder 300 File Location: X:\4000320-00\001\40 Design\01 Sheets - Final Plat\DETAILS.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:16:05 PMFOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N www. alliant- inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By:Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by meorunder 301 PARCEL 1 PARCEL 2 PARCEL 3 PARCEL 3 PARCEL 4 PARCEL 5 R=223.13 L=22.55 5°47'22" C.Brg=N72°04'40"WR= 154. 4 8 L176. 77= 6 5 3 3' 4 5" C. Br g= S4 2° 1 1'28" E PLEASANT VIEW RD R=175. 00 L=71.23 23°19'16"C.Brg= N63°29'54" W REDMAN LANETROENDLE CIRCLENEZ PERCE DR File Location: X:\ 4000320-00\ 001\ 40 Design\01 Sheets - Final Plat\DEMOLITION.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:16:17 PMKnow what's below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N 0 SCALE IN FEET 30 60 120 City Submittal 4-18-2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeDemolition Planwww.alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By: Sheet of Tyler Stricherz TAS, MPR ELL 4000320-00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Civil Engineer under the laws of the State of Minnesota.NOTES: 1.PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE TO MAKE SURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED ALL PLANS AND OTHER DOCUMENTS APPROVED BY ALL OF THE PERMITTING AUTHORITIES.2.CONTRACTOR TO NOTIFY GOPHER STATE ONE CALL, 800-252-1166, 48 HOURS PRIOR TO EXCAVATION WORK. CONTRACTOR SHALL HAVE PRIVATE UTILITIES LOCATED 3.CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES AND TOPOGRAPHIC FEATURES, SUCH AS EXISTING GUTTER GRADES AT THE PROPOSED DRIVEWAYS, PRIOR TO THE START OF SITE GRADING. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM THE PLANS.4.CONTRACTOR SHALL PROPERLY DISPOSE OF ALL MATERIAL REMOVALS.CONTRACTOR TO SALVAGE ALL MATERIALS POSSIBLE AND COORDINATE WITH OWNER ON FINAL USE.5.PRIOR TO EARTH DISTURBANCE, INSTALL EROSION AND SEDIMENT CONTROL AS NECESSARY TO PREVENT SEDIMENT TRANSPORT OFFSITE DURING CONSTRUCTION WORK. INSTALL SILT FENCE AND INLET PROTECTION TO AT DISTURBANCE LIMITS.6.SEE TREE PRESERVATION SHEETS FOR TREE REMOVALS AND INDIVIDUAL TREE LOCATIONS.7.DEVELOPER OR CONTRACTOR TO PROVIDE A COPY OF THE WELL SEALING RECORDS ONCE WELL SEALING IS COMPLETE.. 8. ALL 302 PLEASANT VIEW RDREDMAN LANE TROENDLE CIRCLE NEZ PERCEDR12375123456789101112136BLOCK2BLOCK 2BLOCK 1BLOCK 11000' Shoreland District BoundarySTORMWATER WETLAND/FILTRATIONNWL:994.0100 YEAR HWL:999.86PEACEFUL LANE PEACEFUL LANE 4NEZ PERCE DRIVEPEACEFUL LANE FILTRATION BASIN 2100 YEAR HWL:997.95FileLocation: X:\4000320- 00\001\ 40 Design\01 Sheets - Final Plat\SITE. dwg Plotted By: Tyler Stricherz on April 18, 2025at 303 1000 1010 994 1010 100010161012 1010 1000 996 10041000 100010041006 9961026 1 0 2 2 10 2 0 10201022 101010201000998100610201030 1032 1036103210301030102610241020 10 1 8 10181022101610 1 4 1008 990 992 992 1048 1046 1044 10 4 2 10 4 0 10 3 8 10 3 6 1 0 3 4 1032 1030 1028 1026 102410281026 10261024 1020 1016 1012 1010 PLEASANT VIEW RD REDMAN LANETROENDLE CIRCLENEZ PERCE DR 123 7 5 1 2 3 4 5 67 8 9 10 11 12 13 6 BLOCK 2BLOCK 2BLOCK 1 BLOCK 1 1000' Shoreland District Boundary STORMWATER WETLAND/ FILTRATION NWL:994.0 100 YEAR HWL:999.86 PEACEFUL LANEPEACEFUL LANE4 NEZ PERCE DRIVE PEACEFUL LANEFILTRATION BASIN 2 100 YEAR HWL:997.95 WW WW W W File Location: X:\4000320- 00\ 001\40 Design\01 Sheets - Final Plat\GRADING.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:16:45 PMKnow what's below.Call before you dig.RDial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O NCity Submittal 4-18-2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeGrading & Drainage Planwww.alliant-inc. com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By: Sheet of Tyler Stricherz TAS, MPR ELL 4000320- 00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota.8 27 8 N 0 SCALE IN FEET 30 60 120 GRADING NOTES:1.ALL FINISHED GRADES SHALL SLOPE AWAY FROM PROPOSED BUILDINGS AT MINIMUM GRADE OF 2.0%. ALL SWALES SHALL HAVE A MINIMUM SLOPE OF 2.00%. 2. THE CONTRACTOR SHALL KEEP THE ADJACENT ROADWAYS FREE OF DEBRIS AND PREVENT THE OFF- SITE TRACKING OF SOIL IN ACCORDANCE WITH THE REQUIREMENTS OF THE CITY AND WATERSHED.3.NOTIFY GOPHER STATE ONE CALL, AT (800)252- 1166, 48 HOURS PRIOR TO START OF CONSTRUCTION.4.ALL IMPROVEMENTS TO CONFORM WITH CITY OF CHANHASSEN CONSTRUCTION STANDARDS SPECIFICATION, LATEST EDITION.5. ROCK CONSTRUCTION ENTRANCES SHALL BE PROVIDED AT ALL CONSTRUCTION ACCESS POINTS.6.REFER TO GEOTECHNICAL REPORT AND PROJECT MANUAL, FOR SOIL CORRECTION REQUIREMENTS AND TESTING REQUIREMENTS.7.STRIP TOPSOIL PRIOR TO ANY CONSTRUCTION. REUSE STOCKPILE ON SITE.STOCKPILE PERIMETERS MUST BE PROTECTED WITH SILT FENCE.8.PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE TO MAKE SURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED ALL PLANS AND OTHER DOCUMENTS APPROVED BY ALL OF THE PERMITTING AUTHORITIES.9.IMMEDIATELY FOLLOWING GRADING OF (3:1 OR GREATER) SIDE SLOPES AND DRAINAGE SWALES, WOOD FIBER BLANKET OR OTHER APPROVED SOIL STABILIZING METHOD (APPROVED BY ENGINEER) SHALL BE APPLIED OVER APPROVED SEED MIXTURE AND A MINIMUM OF 6" TOPSOIL.10.THE GENERAL CONTRACTOR MUST DISCUSS DEWATERING PLANS WITH ALL SUBCONTRACTORS TO VERIFY NPDES REQUIREMENTS. IF DEWATERING IS REQUIRED DURING CONSTRUCTION, CONTRACTOR SHOULD CONSULT WITH EROSION CONTROL INSPECTOR AND ENGINEER TO DETERMINE APPROPRIATE METHOD.11.REFER TO STORMWATER POLLUTION PREVENTION PLAN ( SWPPP) FOR ALL EROSION AND SEDIMENT CONTROL DEVICE LOCATION, DESCRIPTIONS, NOTES AND DETAILS INCLUDING CONCRETE WASHOUT STATION INSTRUCTIONS.12.SEE SHEET 9 FOR ROADWAY AND TRIAL CENTERLINE PROFILES.13.SEE SHEET 9 FOR HOUSE PAD HOLDDOWNS & SEE SHEET 7 FOR CITY TYPICAL ROADWAY/STREET SECTION.14.FREEBOARD: THE LOWEST BUILDING OPENING MUST BE AT MINIMUM 1' ABOVE THE EMERGENCY OVER FLOW ELEVATION (EOF) AND BUILDING ADJACENT TO STORMWATER BASIN SHALL BE 3' ABOVE THE 100 YEAR HIGH WATER LEVEL (HWL) RETAINING WALL NOTES:1.ALL RETAINING WALLS SHALL BE ROUGH GRADED AT A 2: 1 SLOPE WITH BASE OF SLOPE AT PROPOSED WALL FACE.2.THE RETAINING WALL SLOPE AREAS ARE TO BE MAINTAINED UNTIL RETAINING WALL CONSTRUCTION OCCURS. ANY EROSION SHALL BE REMEDIED AND RESTORED.3.BUILDING PERMITS ARE REQUIRED FOR ALL RETAINING WALLS 4 FEET IN HEIGHT OR GREATER AND THE WALLS SHALL BE DESIGNED BY A STRUCTURAL ENGINEER WITH DESIGN REVIEWED AND APPROVED BY THE CITY PRIOR TO INSTALLATION. ANY QUESTIONS REGARDING THE BUILDING PERMITS SHALL BE DIRECTED TO THE CITY BUILDING INSPECTOR.4.A SAFETY RAILING IS REQUIRED ATOP ALL WALLS PER BUILDING CODE.5.RETAINING WALL CONTRACTOR AND/ OR RETAINING WALL STRUCTURAL ENGINEER ARE RESPONSIBLE TO REVIEW CIVIL SITE ENGINEERING DRAWINGS. ANY OBSERVED CONCERNS WITH CIVIL SITE ENGINEERING DESIGN ELEMENTS RELATED TO RETAINING WALLS THAT REQUIRE MODIFICATIONS TO THE CIVIL SITE DESIGN IS THEIR RESPONSIBILITY TO COORDINATE WITH PROJECT OWNER AND CIVIL SITE ENGINEER. IF NO COORDINATION 304 PEACEFUL LANE PROFILE NEZ PERCE DRIVE PROFILE BLOCK 2 HOLD DOWN DETAILS WALKOUT PAD SUBGRADE CORRECTION FULL BASEMENT PAD LOOKOUT PAD BLOCK 1 HOLD DOWN DETAILS WALKOUT PAD SUBGRADE CORRECTION PLAN VIEW: HOLD DOWN DETAIL FULL BASEMENT LOOKOUT PAD File Location: X:\4000320- 00\001\40 Design\ 01 Sheets - Final Plat\ PROFILES.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:16:56 PMKnow what' s below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N www. alliant- inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By:Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil 305 3 7 BLOCK 1 W 1000 1010 994 1010 100099610041006996990 992992PEACEFUL LANEPLEASANT VIEW A A SMW/FILTRATION NWL:994.0 100 YEAR HWL:999.86 BBFile Location: X:\4000320- 00\001\40 Design\ 01 Sheets - Final Plat\ POND DETAILS.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:17:16 PMKnow what' s below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N 0 SCALE IN FEET 15 30 60 10 www. alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By: Designed By:Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or reportwas prepared by me or under my direct supervision and that I am a duly Licensed Civil 306 1 2 3 4 10 11 12 13 BLOCK 2PEACEFUL LANEFILTRATION BASIN 2 100 YEAR HWL: 997. 95 GU REDMAN LANE1026 1 0 2 2 101010201000998100610201030 1032 10221032 1030 1028 1026 102410281026 10261024 C C'PE 502 to EX PIPE PROFILE File Location: X:\4000320-00\ 001\ 40 Design\ 01 Sheets - Final Plat\POND 2.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3: 17: 35 PMKnow what's below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N 0 SCALE IN FEET 15 30 60 11 www.alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By:Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am 307 GU 997.62 1000 1010 994 1010 100010161012 1010 1000 996 10041000 100010041006 9961026 1 0 2 2 10 2 0 10201022 101010201000998100610201030 1032 1036103210301030102610241020 10 1 8 10181022101610 1 4 1008 40001 (HUB) 40002 (HUB) 40003 (HUB) 40004 (HUB) 40005 (HUB) 40006 (HUB) 40007 (HUB) 40008 (HUB) 40018 (HUB) 990 992 992 1048 1046 1044 10 4 2 10 4 0 10 3 8 10 3 6 1 0 3 4 1032 1030 1028 1026 102410281026 10261024 1020 1016 1012 1010 GU PLEASANT VIEW RD REDMAN LANETROENDLE CIRCLENEZ PERCE DR 123 7 5 1 2 3 4 5 67 8 9 10 11 12 13 6 BLOCK 2BLOCK 2BLOCK 1 BLOCK 1 STORMWATER WETLAND/ FILTRATION NWL:994.0 100 YEAR HWL:999.86 PEACEFUL LANEPEACEFUL LANE4 NEZ PERCE DRIVE PEACEFUL LANEFILTRATION BASIN 2 100 YEAR HWL: 997. 95 DND DND DND DND DND DNDDND DNDDNDDND DND DND DND File Location: X:\4000320- 00\ 001\40 Design\01 Sheets - Final Plat\EROSION CONTROL. dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:17:55 PMKnow what's below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N www.alliant-inc. com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By:Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota.12 27 12 N 0 SCALE IN FEET 30 60 120 VICINITYMAPNOT TO SCALE TBD: MPCA CERTIFIED SWPPP INSPECTOR INSPECTOR:EROSION CONTROL PARTIES LEGEND: DIRECTION OF DRAINAGE PROPOSED CONTOUR EXISTING CONTOUR PROPERTY LINE LOT LINE RIGHT-OF- WAY EXISTING TREE PROPOSED SEDIMENT SILT FENCE PRE SF DO NOT DISTURB AREASDND PST SF EROSION CONTROL BLANKET CATEGORY 3N)DESIGNER: ALLIANT ENGINEERING 733 MARQUETTE AVE.STE. 700 MINNEAPOLIS, MN 55402 CONTACT: TYLER STRICHERZ PH: 612-767-9330 INSTALLER: PRE GRADING)PROPOSED SEDIMENT SILT FENCE POST GRADING)ROCK CONSTRUCTION ENTRANCE TBD: MPCA CERTIFIED SWPPP INSTALLER RESPONSIBLE PARTY:DISTURBED AREA 12.0 AC EROSION CONTROL BLANKET 3,878 SY SILT FENCE 6,887 LF INLET PROTECTION 12 EA SWPPP BMP QUANTITIES PER PLAN):RACHEL CONTRACTING THE MASS GRADING CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ALL EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES ( BMPS) AS SHOWN IN THE SWPPP. THE BMPS ARE TO BE INSTALLED AT A MINIMUM AS SHOWN IN THE PLAN, IF CONDITIONS ARISE, ADDITIONAL BMP SUPPLEMENTATION TO PREVENT SITE EROSION OR SEDIMENT TRANSPORT MAY BE NECESSARY. THE MASS GRADING CONTRACTOR IS RESPONSIBLE FOR ALL BMPS REQUIRED TO COMPLETE THE MASS GRADING ACTIVITIES. THE MASS GRADING CONTRACTOR IS RESPONSIBLE FOR FINAL SITE STABILIZATION. UTILITY CONTRACTOR INSTALLING UTLITIES MUST MAINTAIN ALL BMPS IN PLACE. STREET CONTRACTOR INSTALLING STREETS MUST MAINTAIN ALL BMPS IN PLACE. AT THE COMPLETION OF PROJECT WORK AND SATISFACTORY SITE SOIL STABILIZATION A NOTICE OF TERMINATION (NOT) SHALL BE FILED ON MPCA WEBSITE. A NOTICE OF TERMINATION WILL CLOSE OUT THE PERMIT. NOTE TO CONTRACTOR: ACTIVE SWPPP LEGEND CONSTRUCTION SEQUENCE APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MULCH BERM FIBER ROLLS / MULCH SOCKS SILT FENCE TEMPORARY MULCH COVER TEMPORARY HYDROMULCH EROSION CONTROL BLANKET ROCK DRIVEWAY / ROCK PADS INLET PROTECTION DEVICES PAVEMENT (DRIVEWAY/ROADS)SOD STOCKPILES NOTE: CONTRACTOR, GENERAL CONTRACTOR OR SWPPP INSPECTOR TO COMPLETE TABLE AS GRADING PROGRESSES NOTE: 1.SEE SHEET 13 FOR ALL EROSION AND SEDIMENT CONTROL NOTES AND DETAILS.A.ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION BUT IN NO CASE LATER THAN SEVEN (7) DAYS AFTER CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARY OR PERMANENTLY CEASED. B.TEMPORARY SEDIMENT BASIN REQUIREMENTS DESCRIBED IN PART III, B.1. 5 MUST BE USED FOR COMMON DRAINAGE LOCATIONS THAT SERVE AN AREA WITH FIVE ( 5) OF MORE ACRES AT A TIME.DURING CONSTRUCTION:IMPAIRED WATER REQUIREMENT 1 MILE INLET PROTECTION 1. SEDIMENT CONTROL LOG ANTI-TRACKING CONTROL TEMPORARY SEED MIX 1. MnDOT-100 OATS 20-120 DAY STABILIZATION) PERMANENT SEED MIX/STABILIZATION 1. MnDOT 34-271 2. MnDOT 35-241 STABILIZATION BMP' S 1. EROSION CONTROL BLANKET MnDOT CAT. 3N 2. HYDROMULCH MnDOT TYPE 4 2. MnDOT- 150 (1- 308 File Location: X:\4000320- 00\001\40 Design\01 Sheets - Final Plat\ EROSION NOTES.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3: 18:04 PMwww. alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By: Designed By:Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota.13 27 13 EROSION CONTROL SCHEDULE:FINAL STABILIZATION:POLLUTION PREVENTION MANAGEMENT MEASURES:SEDIMENT CONTROL PRACTICES:THE CONTRACTOR MUST ENSURE FINAL STABILIZATION OF THE SITE POST TREE CLEARING. SITE WILL EVENTUALLY TRANSITION TO MASS GRADING WORK AND THE MASS GRADING CONTRACTOR WILL ASSUME MAINTANENCE OF TREE CLEARING BMP INSTALLATIONS AND INSTALL ADDITIONAL BMPS FOR THE FUTURE WORK.THE CONTRACTOR SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION MANAGEMENT MEASURES ON THE SITE:1. SOLID WASTE: COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION AND DEMOLITION DEBRIS AND OTHER WASTES MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS.3. NO ENGINE DEGREASING IS ALLOWED ON SITE.1. SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING SURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS AND STORM SEWER INLETS.2. THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF VEHICLES. ANY SHORT-TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND THE SEDIMENT CONTROL PRACTICES MUST BE INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS COMPLETED. HOWEVER, SEDIMENT CONTROL PRACTICES MUST BE INSTALLED BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE ACTIVITY IS NOT COMPLETE.3. SITE CONSTRUCTION ENTRANCES SHALL BE LOCATED AS SHOWN ON THE PLAN.1. PRIOR TO ANY TREE REMOVAL, SEDIMENT BARRIERS THAT ARE ABLE TO BE INSTALLED AND CONSTRUCTION ENTRANCE SHALL BE INSTALLED AS SHOWN TO INTERCEPT RUNOFF OR PREVENT SEDIMENT TRANSPORT 2. ALL EROSION CONTROL INSTALLATIONS SHALL REMAIN IN PLACE AND BE MAINTAINED IN GOOD CONDITION BY THE CONTRACTOR UNTIL THE SITE HAS BEEN RE-VEGETATED.3. SUFFICIENT TOPSOIL SHALL BE STOCKPILED TO ALLOW FOR THE REPLACEMENT OF 6" OF TOPSOIL FOR DISTURBED AREAS TO BE RE-VEGETATED.4. THE CONTRACTOR SHALL SCHEDULE TREE REMOVAL, SO THAT THE GENERAL SITE CAN BE STABILIZED AND SEEDED SOON AFTER DISTURBANCE. SITE SHALL BE STABILIZED AND SEEDED WITHIN SEVEN ( 7) DAYS AFTER DISTURBANCE OCCURS.MAINTENANCE PROGRAM:1. INSPECT SEDIMENT BARRIERS IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. IMMEDIATELY REPAIR FAILED OR FAILING SEDIMENT CONTROL LOGS.2. REPLACEMENT - SHALL BE REPLACED PROMPTLY WHEN IT DECOMPOSES OR BECOMES INEFFECTIVE BEFORE THE BARRIER IS NO LONGER NECESSARY. 3. SEDIMENT REMOVAL - SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-THIRD THE HEIGHT OF THE BARRIER.4. REMOVAL OF SEDIMENT CONTROL LOG - SEDIMENT CONTROL LOG SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPWARD SLOPING AREA HAS BEEN PERMANENTLY STABILIZED. IF THE UPWARD SLOPING AREA IS TO BE EXPOSED LONGER THAN SIX (6) MONTHS, THAT AREA SHALL BE COVERED WITH TEMPORARY VEGETATION WHEN FIRST EXPOSED.5. THE CONTRACTOR MUST ROUTINELY INSPECT THE CONSTRUCTION SITE ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0. 5 INCHES IN 24 HOURS.6.ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED IN WRITING AND THESE RECORDS MUST BE RETAINED WITH THE SWPPP RECORDS OF EACH INSPECTION AND MAINTENANCE ACTIVITY. COPY OF INSPECTION AND MAINTANENCE RECORDS SHALL ALSO BE SENT TO THE CITY OF CHANHASSEN TO THE ATTENTION OF RYAN PINKALLA (rpinkalla@chanhassenmn.gov). THE RECORDS SHALL INCLUDE AT MINIMUM:A. DATE AND TIME OF INSPECTIONS;B. NAME OF PERSON(S) CONDUCTING INSPECTIONS;C. FINDINGS OF INSPECTIONS, INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTIONS;D. CORRECTIVE ACTIONS TAKEN ( INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE ACTIVIES.E. DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 1/2 INCH (0.5 INCHES) IN 24 HOURS:F. DOCUMENTS OF CHANGES MADE TO THE SWPPP AS REQUIRED IN PART III.A.4.7.WHERE PARTS OF THE CONSTRUCTION SITE HAVE UNDERGONE FINAL STABILIZATION, BUT WORK REMAINS ON OTHER PARTS OF SITE, INSPECTIONS OF THE STABILIZED AREAS MAY BE REDUCED TO ONCE PER MONTH. WHERE WORK HAS BEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS, THE REQUIRED INSPECTIONS AND MAINTENANCE MUST TAKE PLACE AS SOON AS RUNOFF OCCURS AT THE SITE OR PRIOR TO RESUMING CONSTRUCTION, WHICHEVER COMES FIRST.EROSION AND SEDIMENT CONTROL Know what's below.Call before you dig.R Dial 811 EROSION CONTROL ADDITIONAL NOTES:1. NO LAND DISTURBING ACTIVITY SHALL OCCUR UNTIL A PERMIT HAS BEEN ISSUED FROM THE CITY OF CHANHASSEN.2. BEST MANAGEMENT PRACTICES (BMP'S) REFER TO EROSION AND SEDIMENT CONTROL PRACTICES DEFINED IN THE MPCA PROTECTING WATER QUALITY IN URBAN AREAS AND THE MINNESOTA CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL PLANNING HANDBOOK.3. ALL BMP'S SELECTED SHALL BE APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS, AND ESTIMATED DURATION OF USE.4. ALL WORK AND MATERIALS SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION FROM THE APPROVED PLANS SHALL REQUIRE WRITTEN APPROVAL FROM THE ENGINEER OF RECORD.5. A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. PLANS, SWPPP TO BE LOCATED ONSITE IN MAILBOX.6. THE BOUNDARIES OF THE LAND DISTURBANCE LIMITS SHOWN ON THE PLANS SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. NO DISTURBANCE BEYOND THE DISTURBED LIMITS.7. WHEREVER POSSIBLE, PRESERVE THE EXISTING TREES, GRASS AND OTHER VEGETATIVE COVER TO HELP FILTER RUNOFF.8. ALL TREES NOT LISTED FOR REMOVAL SHALL BE PROTECTED. DO NOT OPERATE EQUIPMENT WITHIN THE DRIPLINE, ROOT ZONES OR WITHIN TREE PROTECTION FENCE AREAS.9. ALL EROSION AND SEDIMENT CONTROL FACILITIES (BMP'S) SHALL BE INSTALLED AND IN OPERATION PRIOR TO LAND DISTURBANCE ACTIVITIES, IF HEAVY TREE AREAS SOME TREE REMOVAL WILL LIKELY BE REQUIRED PRIOR TO SILT FENCE INSTALLATION, UPON TREE REMOVAL COMPLETION SILT FENCE SHALL BE INSTALLED AS REQUIRED.10. PROTECT WETLANDS, WATERCOURSES AND ADJACENT PROPERTIES FROM SEDIMENTATION AND STORMWATER RUNOFF.11. THE BMP'S SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS FOR THE ANTICIPATED SITE CONDITIONS AND TREE CLEARING WORK. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITTEE/CONTRACTOR SHALL ANTICIPATE THAT MORE BMP'S WILL BE NECESSARY TO ENSURE EROSION AND SEDIMENT CONTROL ON THE SITE. DURING THE COURSE OF CONSTRUCTION, IT IS THE RESPONSIBILITY OF THE PERMITTEE/CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY CONSTRUCTION ACTIVITIES AND/OR CLIMATIC EVENTS AND TO PROVIDE ADDITIONAL BMP'S OVER AND ABOVE THE MINIMUM REQUIREMENTS SHOWN ON THE PLANS, AS MAY BE NEEDED TO PROVIDE EFFECTIVE PROTECTION OF WATER AND SOIL RESOURCES.12. THE BMP'S SHALL BE INSPECTED DAILY BY THE PERMITTEE/CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.13. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED FROM EROSION WITHIN 7 DAYS OF COMPLETION OF TREE CLEARING IN THAT AREA. TEMPORARY SEED AND MULCH SHALL COVER ALL EXPOSED SOILS IF GRADING COMPLETION IS DELAYED LONGER THAN 7 DAYS.14. GENERAL TEMPORARY SEED SHALL BE MNDOT MIX 150 @ 100 LBS. PER ACRE OR APPROVED EQUAL. PERMANENT SEED SHALL BE MNDOT MIX 270 @ 120 LBS. PER ACRE OR APPROVED EQUAL. (PLANTING DATES PER SPEC 2575).15. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PROPERLY DISPOSED OF WITHIN THIRTY (30) DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED. DEWATERING:1.THE CONTRACTOR SHALL PROVIDE A PLAN TO THE CITY AND PROJECT ENGINEER FOR REVIEW. THE PLAN AT MINIMUM SHALL BE A DEWATERING PLAN INCLUDING WATER ROUTING, STORAGE, AND DISCHARGE LOCATION.2.IF ANY TEMPORARY DEWATERING IS REQUIRED ONSITE THE 309 GU PLEASANT VIEW RD REDMAN LANETROENDLE CIRCLENEZ PERCE DR 123 7 5 1 2 3 4 5 67 8 9 10 11 12 13 6 BLOCK 2BLOCK 2BLOCK 1 BLOCK 1 STORMWATER WETLAND/ FILTRATION NWL:994.0 100 YEAR HWL:999.86 PEACEFUL LANEPEACEFUL LANE4 NEZ PERCE DRIVE PEACEFUL LANEFILTRATION BASIN 2 100 YEAR HWL:997.95 R2 5 0 File Location: X:\4000320- 00\ 001\40 Design\01 Sheets - Final Plat\SAN-WM. dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:18:26 PMKnow what's below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O NCity Submittal 4-18-2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeSanitary Sewer & Watermain Planwww. alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By: Designed By: Sheet of Tyler Stricherz TAS, MPR ELL 4000320-00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota.14 27 14 N 0 SCALE IN FEET 30 60 120 LEGEND: PROPOSED SANITARY SEWER PROPOSED WATERMAIN PROPOSED STORM SEWER EXISTING GATE VALVE EXISTING HYDRANT EXISTING WATERMAIN EXISTING CATCH BASIN EXISTING STORM MANHOLE EXISTING STORM SEWER EXISTING SANITARY MANHOLE EXISTING SANITARY SEWER PROPOSED CATCH BASIN PROPOSED SANITARY MANHOLE UTILITY NOTES: 1.EXISTING UTILITIES, SERVICE LOCATIONS AND ELEVATIONS SHALL BE VERIFIED IN FIELD PRIOR TO CONSTRUCTION.2.MAINTAIN A MIN 18" VERTICAL SEPARATION AT ALL WATERMAIN PIPE CROSSINGS. WATER LINES TO MAINTAIN 10' HORIZONTAL SEPARATION FROM SANITARY SEWER AND STORM SEWER. LOWER WATERMAIN AS NECESSARY.3. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS PRIOR TO THE START OF CONSTRUCTION.4.PROVIDE POLYSTYRENE INSULATION FOR ALL WATERMAIN CROSSINGS WHERE VERTICAL OR HORIZONTAL SEPARATION IS LESS THAN 18".5.ALL UTILITY WORK WITHIN THE R.O.W. SHALL COMPLY WITH THE CITY OF CHANHASSEN ENGINEERING GUIDELINES.6.NOTIFY GOPHER STATE ONE CALL 48 HOURS IN ADVANCE OF ANY UTILITY WORK.7.PROVIDE TEMPORARY TRAFFIC CONTROL IN COMPLIANCE WITH MNDOT TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS-FIELD MANUAL" LATEST REVISION,FOR ANY CONSTRUCTION WITHIN PUBLIC R.O.W.8. ALL SANITARY MANHOLES TO BE 48" DIAMETER CONCRETE W/NEENAH R-1642 CASTING, UNLESS NOTED OTHERWISE.9.WATERMAIN, SERVICES, AND VALVES SHALL BE INSTALLED WITH MINIMUM 7.5' OF COVER.10.WATER SERVICES 310 PEACEFUL LANEPROFILEGU71234 56789101112136BLOCK 2 BLOCK2BLOCK1STORMWATERWETLAND/FILTRATIONNWL: 994.0100 YEAR HWL:999.86PEACEFUL LANEPEACEFUL LANENEZ PERCE DRIVEPEACEFUL LANES= 0+45 IE= 1002.04 CBE= 1012.0 LFE= 1008.4 R= 3 S= 1+30 IE= 1008.41 CBE= 1018.1 LFE= 1014.3 R= 5 S= 2+18 IE= 1014.21 CBE= 1024.2 LFE= 1020.5 R= 6 S= 3+14 IE= 1019.74 CBE= 1029.9 LFE= 1023.4 R= 6 S= 0+ 16 IE=1021. 30 CBE= 1031. 1 LFE=1025. 5 R=2. 5 S= 1+42 IE= 1022.09 CBE= 1032.5 LFE= 1026.0 R= 2 S= 1+56 IE= 1020.27 CBE= 1032.9 LFE= 1024.5 R= 0 S= 1+53 IE= 1020.44 CBE= 1032.9 LFE= 1024.5 R= 0 S= 0+ 60 IE=1003. 22 CBE= 1013. 0 LFE=1009. 6 R=3. 5 S= 1+70 IE= 1009.76 CBE= 1020.8 LFE= 1017.2 R= 4 S= 2+76 IE= 1018.51 CBE= 1028.2 LFE= 1022.3 R= 8 S= 0+06 IE= 1020.97 CBE= 1031.1 LFE= 1025.0 R= 2 S= 1+12 IE=1020.77 CBE= 1032.4 LFE=1025.7 R= 0 INSTALL SAN MH 1 ATOP EXISTING SANITARY SEWER CONNECT TO EXISTING 6" WATERMAIN W/ 6" TEE,2- 8" GV, 8"x6" REDUCER FIRE HYDRANT W/6" GV, 8"x6" TEE, 18.2' - 6" PVC C900 FLANGE EL=1022. 43 STA:6+14.37 FIRE HYDRANT W/6" GV, 8"x6" REDCER, 5.0' - 6" PVC C900 FLANGE EL=1032.70 STA:9+ 60.20 45° BEND SAN MH 7 11.25° & 45° BEND 45° BEND 45 & 22.5° BEND SAN MH 6 SAN MH 3 SAN MH 2 8"x8" TEE W/ 2-8" GV TRACER WIRE ACCESS BOX TRACER WIRE ACCESS BOX EX SAN MH 1B TO REMAIN EX SAN MH 1A ADJUST RIM LOCATION OF EXISTING SERVICE TO RESIDENT.TO REMAIN ACTIVE.File Location: X:\4000320-00\001\40 Design\ 01 Sheets - Final Plat\PROFILE - U1.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:18:43 PMKnow what's below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O NCity Submittal 4-18-2025 Final Plat SubmittalSanitary Sewer & Watermain Plan & Profileswww.alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By: Designed By:Sheet of Tyler Stricherz TAS, MPR ELL 4000320-00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota.15 27 15N0 SCALE IN FEET 25 50 100 NOTES:1.ALL SANITARY SERVICES SHALL BE 6" PVC SDR 26 @ 1.0%MIN. SLOPE.2.ALL SANITARY MANHOLES SHALL BE 48" DIAMETER AND HAVE NEENAH R-1642 CASTINGS UNLESS NOTED OTHERWISE ON THE PLAN.3. ALL WATER SERVICES SHALL BE 1" HDPE SDR-9 WITH 1"CORP. STOP AND CURB STOP.4.CONTRACTOR TO VERIFY AND SHOOT ELEVATION OF SANITARY SEWER SERVICE STUBS 311 NEZ PERCE DRIVE PROFILE NEZ PERCE DR 7 5 1 2 11 12 13 6 BLOCK 1 BLOCK 1 NWL:994.0 100 YEAR HWL:999.86 4 NEZ PERCE DRIVE PEACEFUL LANES= 0+ 27 IE=997. 86 CBE= 1009. 5 LFE=1002. 8 R= 0 FIRE HYDRANT W/6" GV, 8"x6" TEE,8.2' - 6" PVC C900 FLANGE EL=1009. 57 STA:1+09. 58 22.5° BEND SAN MH 3 8"x8" TEE W/ 2-8" GV S= 1+ 10 IE=1000. 74 CBE= 1010. 6 LFE=1004. 3 R= 3 S= 0+ 32 IE=998. 93 CBE= 1009. 7 LFE=1002. 5 R= 2 REMOVE EXISTING PLUG & HYDRANT,CONNECT TO EXISTING 8" WATERMAIN W/ 8" GV 45° BEND LOT 7 TO USE EXISTING UTILITY SERVICES S= 1+ 58 IE=1002. 3 SAN MH 4 SAN MH 5 TRACER WIRE ACCESS BOX TRACER WIRE ACCESS BOX PLEASANT VIEW RD 123 5 BLOCK 1 STORMWATER WETLAND/ FILTRATION 100 YEAR HWL:999. 86 4 S= 1+ 10 IE=1000. 74 CBE= 1010. 6 LFE=1004. 3 R= 3 EXISTING FIRE HYDRANT TO REMAIN LOT 2 TO USE EXISTING UTILITY SERVICES S= 0+ 5 IE=997. 1 LOT 1 TO USE EXISTING UTILITY SERVICES S= 0+ 90 IE=1003. 0 LOT 3 TO USE EXISTING UTILITY SERVICES S= 0+ 40 IE=997. 3 File Location: X:\ 4000320-00\001\40 Design\ 01 Sheets - Final Plat\PROFILE - U2.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:19:01 PMKnow what's below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N www.alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By:Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota.16 27 16 N 0 SCALE IN FEET 25 50 100 NOTES:1.ALL SANITARY SERVICES SHALL BE 6" PVC SDR 26 @ 1.0%MIN. SLOPE.2. ALL SANITARY MANHOLES SHALL BE 48" DIAMETER AND HAVE NEENAH R-1642 CASTINGS UNLESS NOTED OTHERWISE ON THE PLAN.3. INSIDE DROP MANHOLES SHALL BE 60" DIA. MANHOLES, SEE DETAIL 2104 4.ALL WATER SERVICES SHALL BE 1" HDPE SDR-9 WITH 1"CORP. STOP AND CURB STOP. 5. WATERMAIN BLOW-OFF SHALL BE REMOVED AFTER TESTING. 6.CONTRACTOR TO VERIFY AND SHOOT ELEVATION OF SANITARY SEWER STUBS FOR AS-BUILTS. CONVEY TO ENGINEER FOR RECORDS.LEGEND:S = SANITARY SERVICE WYE STATION FROM DOWNSTREAM MH)IE = SANITARY SERVICE INVERT ELEVATION CBE = CURB BOX ELEVATION SE = SURFACE 312 PLEASANT VIEW RD REDMAN LANETROENDLE CIRCLENEZ PERCE DR 123 7 5 1 2 3 4 5 67 8 9 10 11 12 13 6 BLOCK 2BLOCK 2BLOCK 1 BLOCK 1 STORMWATER WETLAND/ FILTRATION NWL:994.0 100 YEAR HWL:999.86 PEACEFUL LANEPEACEFUL LANE4 NEZ PERCE DRIVE PEACEFUL LANEFILTRATION BASIN 2 100 YEAR HWL:997. 95 REFER TO POND DETAIL SHEET 11 REFER TO POND DETAIL SHEET 10 PROPOSED ROW PEACEFUL LANE ROAD EXTENSION TO BE CONSTRUCTED IN COORDINATION WITH THE CITY OF CHANHASSEN File Location: X:\4000320- 00\ 001\40 Design\01 Sheets - Final Plat\STORM SEWER. dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:19:17 PMKnow what's below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N www.alliant-inc. com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By:Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota.17 27 17 N 0 SCALE IN FEET 30 60 120 LEGEND: PROPOSED SANITARY SEWER PROPOSED WATERMAIN PROPOSED STORM SEWER EXISTING GATE VALVE EXISTING HYDRANT EXISTING WATERMAIN EXISTING CATCH BASIN EXISTING STORM MANHOLE EXISTING STORM SEWER EXISTING SANITARY MANHOLE EXISTING SANITARY SEWER PROPOSED CATCH BASIN PROPOSED SANITARY MANHOLE DT PROPOSED DRAINTILE PROPOSED DRAINTILE STRUCTURE UTILITY NOTES: 1.EXISTING UTILITIES, SERVICE LOCATIONS AND ELEVATIONS SHALL BE VERIFIED IN FIELD PRIOR TO CONSTRUCTION.2.MAINTAIN A MIN 18" VERTICAL SEPARATION AT ALL PIPE CROSSINGS, LOWER WATERMAIN AS NECESSARY. WATER AND SANITARY SEWER LINES TO MAINTAIN 10'HORIZONTAL SEPARATION.3.CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS PRIOR TO THE START OF CONSTRUCTION.4. PROVIDE POLYSTYRENE INSULATION FOR ALL STORM SEWER AND WATERMAIN CROSSINGS WHERE VERTICAL OR HORIZONTAL SEPARATION IS LESS THAN 2'.5.ALL UTILITY WORK WITHIN THE R. O.W. SHALL COMPLY WITH THE CITY OF CHANHASSEN ENGINEERING GUIDELINES.6.NOTIFY GOPHER STATE ONE CALL 48 HOURS 313 PEACEFUL LANEPROFILE751234 56789101112136BLOCK 2 BLOCK2BLOCK1STORMWATER WETLAND/ FILTRATIONNWL: 994. 0100 YEAR HWL: 999.86PEACEFUL LANEPEACEFUL LANENEZ PERCE DRIVEPEACEFUL LANE31' B B 50 R O W 31' B- B50' ROWL=185. 81 088. 7156 R=120. 0 L=144.23 082. 6381 R=100. 0 L=17. 16 003.2771 R= 300.0 L=49.52 009.4585 R= 300.0 FES 300 CONNECT TO EXITING PEACFUL LANE STA:1+ 00.00 9 CY CL3 RIP RAP CB 302 CBMH 301 W/ 4' SUMP CB 207 CBMH 208 MH 206 CBMH 209 CB 211 MH 212 CB 213 CONNECT TO EXITING BIT. EDGE. 3' TRANSITION TO NO CURB PEACEFUL LANE ROAD EXTENSION TO BE CONSTRUCTED IN COORDINATION WITH THE CITY OF CHANHASSEN EXTEND/CONNECT TOEXITING DRIVEWAY. MAINTAIN ACCESS TODRIVEWAYAT ALL TIMES.SURMOUNTABLE C&G SURMOUNTABLE C& GR20'R2 0 R28' R28 R48'R60' ROWSTREET LIGHTSTREET LIGHT BEGIN 10' TRANSITION TO B618 C&G STA:3+89.52 END 10' TRANSITION TO SURMOUNTABLE C&G STA:4+ 60.21 CB 210 SEE SHEET 19 FOR PROFILE PE103 TO FES100) DRAINTILE CLEANOUT ( TYP)4" PERFORATED DRAINTILE ( TYP)DRAINTILE CLEANOUT (TYP) DRAINTILE CLEANOUT (TYP.) DRAINTILE CLEANOUT (TYP)DRAINTILE CLEANOUT (TYP)File Location: X:\4000320- 00\001\40 Design\01 Sheets - Final Plat\ PROFILE - S1.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:19: 43 PMKnow what's below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N www.alliant- inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.: Drafted By:Designed By:Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota.18 27 180 SCALE IN FEET 25 50 100 NOTES:1.ALL NEW MAIN LINE STORM SEWERS SHALL BE VIDEO INSPECTED AT OWNERS EXPENSE, AND A DIGITAL HARD DRIVE (USB) SHALL BE PROVIDED TO THE CITY.2.HIGH DENSITY POLYETHYLENE EXTRUDED (HDPE)ADJUSTING RINGS ARE REQUIRED FOR ALL MANHOLE STRUCTURES. 3.INSTALL DRAINTILE AT CATCH BASIN LOCATIONS PER CITY STANDARD DETAIL 5232. DRAINTILE CONNECTIONS TO STORM SEWER STRUCTURES SHALL BE - 3. 3' BELOW RIM ELEVATION AT CURB.4.DRAIN TILE AT CLEANOUTS TO HAVE CURB BOX AND TRACER WIRE PER CITY STANDARD DETAIL 5234. 5.ALL INTERSECTION CURB RETURNS SHALL BE B618. 6. SEE TYPICAL STREET SECTIONS ON SITE, SIGNAGE, & LIGHTING PLAN SHEET 7. NNOTES: 1.ALL CASTINGS SHALL BE NEENAH OR APPROVED EQUAL.MH NO. SIZE CASTING 206 48"R- 1642 STRUCTURE AND CASTING SCHEDULE City Submittal 4-18-2025 314 NEZ PERCE DRIVE PROFILE NEZ PERCE DR 7 5 1 12 13 6 BLOCK 1 BLOCK 1 STORMWATER WETLAND/FILTRATION NWL:994.0 100 YEAR HWL:999.86 PEACEFUL LANE4 NEZ PERCE DRIVE FILTRATION BASIN 2 100 YEAR HWL:997. 95 R20'R20'L= 44.77 025.6522 R= 100.0 L= 65.02 037.2562 R= 100.0 31'B B50' ROW CB 207 MH 206 CB 205 CBMH 204 CB 203 CB 202 W/ 4' SUMP EXCB 3 TO REMAIN,PLUG NORTH INVERT AND MH TO BECOME A SUMP MH. ADJUST RIM ELEVATION CBMH 2 EXMH 1 REMOVE EXISTING CATCH BASIN AND CROSSING STORM MH 101 FES 100 INSTALLED @ EXISTING PIPE OUTLET LOCATION ELEVATION OCS 102 SEE SHEET 10 FOR DETAIL PE 103 CBMH 201 FES 200 8 CY CL3 RIP RAP 14 CY CL3 RIP RAP STREET LIGHT BEGIN 10' TRANSITION TO SURMOUNTABLE C&G STA: 0+30.77 BEGIN 10' TRANSITION TO SURMOUNTABLE C&G STA:0+ 30.77 4" PERFORATED DRAINTILE (TYP) 4" DRAINTILE CLEANOUT (TYP)EXISTING PUBLIC ROW/EASEMENT MATCH EXISTING ROAD STA: 2+60.25 STOP SIGN AND STREET NAME SIGN, PER DETAIL 5217 0+ 001+002+002+65P I 0 4 6 7 6 PI: 1+95.31 0+ 00 1+002+002+69PI: 0+73.41PI: 2+ 46.35 Storm Sewer 100- 103 PROFILE Storm Sewer 200-203 PROFILE File Location: X:\4000320-00\ 001\40 Design\01 Sheets - Final Plat\ PROFILE - S2.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:20:15 PMKnow what's below. Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N www.alliant-inc. com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By: Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota.19 27 190 SCALE IN FEET 25 50 100 N City Submittal 4-18-2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeStreet & Storm Sewer Plan & Profiles4000320-00 NOTES:1.ALL NEW MAIN LINE STORM SEWERS SHALL BE VIDEO INSPECTED AT OWNERS EXPENSE, AND A DIGITAL HARD DRIVE ( USB) SHALL BE PROVIDED TO THE CITY. 2.HIGH DENSITY POLYETHYLENE EXTRUDED (HDPE)ADJUSTING RINGS ARE REQUIRED FOR ALL MANHOLE STRUCTURES.3.INSTALL DRAINTILE AT CATCH BASIN LOCATIONS PER CITY STANDARD DETAIL 5232. DRAINTILE CONNECTIONS TO STORM SEWER STRUCTURES SHALLBE - 3.3' BELOW RIM ELEVATION AT CURB.4.DRAIN TILE AT CLEANOUTS TO HAVE CURB BOX AND TRACER WIRE PER CITY STANDARD DETAIL 5234. 5.ALL INTERSECTION CURB RETURNS SHALL BE B618.6. SEE TYPICAL STREET SECTIONS ON SITE, SIGNAGE, &LIGHTING PLAN SHEET 7.NOTES:1.ALL CASTINGS SHALL BE NEENAH OR APPROVED EQUAL. 315 1 13 NEZ PER C E D R I V E PEACEFUL LANER20' R20' 1 0 0 9 8 1 T C 1011.24TC1009. 81TC-HP1009. 19TC 2. 50%0.75 0.752 00%200%B618 C& G SURMOUNTABLE C& G31'31'-2. 00%-2.00% 1012 1011101010091008 1009 1009 SURMOUNTABLE C& G - 5. 51% STREET LIGHT (TYP) B618 C&G SURMOUNTABLE C& G 5 67 8 9 PEACEFUL LANER28'R28 SURMOUNTABLE C&G R48' R60' STREET LIGHT ( TYP) CENTEROFCUL- DE- SAC STA:9+30.47 0.75%0 7 5%103210 3 21031-0 7 6 103 2.7 3 T C-H P 1031.8 2 T C 1031. 4 1 T C 1031. 4 1 T C 1031.82TC 0.75%File Location: X:\4000320- 00\001\40 Design\01 Sheets - Final Plat\ SPOT.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:20:36 PMKnow what's below. Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O NCity Submittal 4-18-2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeStreet Intersection Detailswww. alliant-inc.com PROJECT TEAM DATA QA/ QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.: Drafted By:Designed By: Sheet of Tyler Stricherz TAS, MPR ELL 4000320-00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the 316 PLEASANT VIEW RD REDMAN LANETROENDLE CIRCLENEZ PERCE DR 123 7 5 1 2 3 4 5 67 8 9 10 11 12 13 6 BLOCK 2BLOCK 2BLOCK 1 BLOCK 1 STORMWATER WETLAND/ FILTRATION NWL:994.0 100 YEAR HWL:999.86 PEACEFUL LANEPEACEFUL LANE4 NEZ PERCE DRIVE PEACEFUL LANEFILTRATION BASIN 2 100 YEAR HWL:997.95 File Location: X:\4000320- 00\ 001\40 Design\01 Sheets - Final Plat\WETLAND.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:20:47 PMKnow what's below.Call before you dig.R Dial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N www.alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By: Sheet of Tyler Stricherz TAS, MPR ELL I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am 317 GU 997.62 1000 1010 994 1010 100010161012 1010 1000 996 10041000 100010041006 9961026 1 0 2 2 10 2 0 10201022 101010201000998100610201030 1032 1036103210301030102610241020 10 1 8 10181022101610 1 4 1008 990 992 992 1048 1046 1044 10 4 2 10 4 0 10 3 8 10 3 6 1 0 3 4 1032 1030 1028 1026 102410281026 10261024 1020 1016 1012 1010 GU PLEASANT VIEW RD REDMAN LANETROENDLE CIRCLENEZ PERCE DR STORMWATER WETLAND/FILTRATION NWL: 994.0 100 YEAR HWL: 999.86 PEACEFUL LANEPEACEFUL LANENEZ PERCE DRIVE PEACEFUL LANEFILTRATION BASIN 2 100 YEAR HWL: 997. 95 WW WW W W 176 181 1909 1910 1968 1972 1 2 3 4 5 6 78 9 10 11 12 13 14 1516 17 18 1920 2122 23 24 25 26 2728 29 3031 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 5253 54 55 56 57 5859 60 61 62 6364 65 66 67 68 69 70 71 72 73 74 75 767778 79 80 81 8283 84 85 86 87 88 89 90 91 9293 94 95 96 97 9899100 101 102 103 104 105 106 107 108 109110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126127 128 129130 131 132 133 134 135 136137 138 139 140141142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157158 159160 161 162 163 164 165166 167168 169170 171 172 173 174 175 177 178 179 180 182 183 184 185 186 187188 189 190 191 192 193 194 195 196 197 198 199 200 301 302 303 304305306 307 308309310 311 312313 314315316317318 319 320 321 322 323324325326 327328 329 330331332333334335336337338339340341 342 343 344345346347 348 349350 351 352 353354 355356357 358 359360361 362363364365 366 367 368 369 370 371 372 373374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389390 391 392 393 394 395396 397 398 399 400 401 402 403 404405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 1588 15891590 15911592 15931594 1595159615971598 1599 160016011602 160316041605 1606160716081609161016111612 1613 1614 1615 1616 1617 1618 1619 1620 1621 1622 1623 1624 1625 1626 1627 1628 1629 1630 1631 1632 1633 1634 1635 1636 1637 1638 1639 1640 1641 1642 1643 1644 1645 1646 1647 1648 1649 16501651 1652 1653 1654 1655 16561657 16581659 1660 1661 1662 1663 1664 1665 16661667 1668 1669 1670 1671 1672 1673 1674 1675 1676 1677 1678 1679 1680 1681 1682 1683 1684 1685 1686 1687 1688 1689 1690 1691 1692 1693 1694 1695 1696 1697 1698 1699 1700 1701 17021703 1704 1705 17061707 1708 1709 1710 1711 1712 1713 1714 1715 1716 1717 1718 1719 1720 1721 1722 1723 1724 1725 1726 17271728 17291730 1731 1732 1733 1734 1735 1736 1737 1738 1739 1740 1741 17421743 1744 17451746 1747 1748 1749 1750 1751 1752 1753 1754 1755 1756 1757 1758 1759 1760 1761 1762 1763 1764 1765 1766 1767 1768 1769 17701771 1772 1773 1774 17751776 1777 1778 1779 1780 1781 1782 17831784 1785 178617871788 1789 1790 1791 1792 1793 1794 1795 1796 1797 1798 1799 1800 180118021803 1804 1805 18061807 1808 18091810 18111812 1813 1814 181518161817 18181819 1820 1821 1822 18231824 1825 1826 1827 1828 1829 1830 18311832 183318341835 183618371838 1839 1840 18411842 1843 1844 1845 184618471848 1849 1850 18511852 1853 18541855 1856 1857 1858 1859 18601861 1862 18631864 18651866 1867 1868 1869 1870 1871 1872 1873 1874 1875 1876 1877 1878 1879 1880 1881 1882 1883 1884 1885 1886 1887 1888 1889 1890 1891 1892 1893 1894 1895 1896 1897 1898 18991900 1901 1902 1903 1904 1905 1906 1907 1908 1911 1912 1913 1914 1915 1916 1917 1918 1919 1920 1921 1922 1923 1924 1925 1926 1927 1928 1929 1930 1931 1932 1933 1934 1935 1936 19371938 19391940 1941 1942 1943 1944 1945 1946 1947 1948 1949 1950 1951 1952 1953 1954 1955 1956 1957 1958 1959 1960 1961 1962 1963 1964 1965 196619671969 1970 1971 1973 1974197519761977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 19891990 1991 1992 1993 19941995 1996 1997 1998 1999 2000 969 970 File Location: X:\ 4000320- 00\001\ 40 Design\01 Sheets - Final Plat\TREE - INV.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:21:04 PMKnow what's below.Call before you dig.R Dial811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O NCity Submittal 4-18-2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeTree Preservation PlanTyler Stricherz TAS, MPR TLM 4000320-00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota. 22 27 22 N 0 SCALE IN FEET 30 60 120 www.alliant- inc.com PROJECT TEAM DATA QA/ QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By: Designed By:Sheet of www.alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By: Designed By:Sheet of CANOPY CALCULATIONS: TREE PRESERVATION NOTES: LEGEND: PLAN NOTE: TREE PROTECTION SHALL BE PROVIDED BY CONTRACTOR AS REQUIRED TOENSURE 318 1000 1010 994 1010 100010161012 1010 1000 996 10041000 100010041006 9961026 1 0 2 2 10 2 0 10201022 10101020101610 1 4 1008 990 992 992 102610261024 1020 1016 1012 1010 PLEASANT VIEW RD NEZ PERCE DR STORMWATER WETLAND/FILTRATION NWL:994.0 100 YEAR HWL:999.86 PEACEFUL LANENEZ PERCE DRIVE WW WW W W 1909 1910 1972 1 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157158 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 1588 1589 1590 15911592 15931594 1595159615971598 1599 1600 16011602 160316041605 1606 16071608 16091610 16111612 1613 1614 1615 1616 1617 1618 1619 1620 1621 1622 1623 1624 1625 1626 1627 1628 1629 1630 1631 1632 1633 1634 1635 1636 1637 1638 1639 1640 1641 1642 1643 1644 1645 1646 1647 1648 1649 1650 1651 1652 1653 1654 1655 1656 1657 1658 1659 1660 1661 1662 1663 1664 1665 1666 1667 1668 1669 1670 1671 1672 1673 1674 1675 1676 1677 1678 1679 1680 1681 1682 1683 1684 1685 1686 1687 1688 1689 1690 1691 1692 1693 1694 1695 1696 1697 1698 1699 1700 1701 1702 1703 1704 1705 17061707 1708 1709 1710 1711 1712 1713 1714 1715 1716 1717 1718 1719 1720 1721 1722 1723 1724 1725 1726 17271728 17291730 1731 1732 1733 1734 1735 1736 1737 1738 1739 1740 1741 1742 1743 1744 17451746 1747 1748 1749 1750 1751 1752 1753 1754 1755 1756 1757 1758 1759 1760 1761 1762 1763 1764 1765 1766 1767 1768 1769 17701771 1772 1773 1774 1775 1776 1777 1778 1779 1780 1781 1782 17831784 1785 17861787 1788 1789 1790 1791 1792 1793 1794 1795 1796 1797 1798 1799 1800 180118021803 1804 1805 1806 1807 1808 18091810 1811 1812 1813 1814 181518161817 18181819 1820 1821 1822 18231824 1825 1826 1827 1828 1829 1830 1831 1832 183318341835 183618371838 1839 1840 1841 1842 1843 1844 1845 18461847 1848 1849 1850 1851 1852 1853 18541855 1856 1857 1858 1859 18601861 1862 1863 1864 1865 1866 1867 1868 1869 1870 1871 1872 1873 1874 1875 1876 1877 1878 1879 1880 1881 1882 1883 1884 1885 1886 1887 1888 1889 1890 1891 1892 1893 1894 1895 1896 1897 1898 18991900 1901 1902 1903 1904 1905 1906 1907 1908 1911 1912 1913 1914 1915 1916 1917 1918 1919 1920 1921 1922 1923 1925 1926 1927 1928 1930 1931 1932 1933 1934 1935 1936 1996 1997 File Location: X:\ 4000320-00\001\40 Design\ 01 Sheets - Final Plat\TREE - INV.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:21:11 PMKnow what's below.Call before you dig.R Dial 811 FOR R EVI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O NCity Submittal 4-18-2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeTree Perservation Plan - Enlarged - NorthTyler Stricherz TAS, MPR TLM 4000320- 00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota. 23 27 23 N 0 SCALE IN FEET 15 30 60 www. alliant-inc. com PROJECT 319 GU 997.62 10101020998100610201030 1032 1036103210301030102610241020 10 1 8 1018102210161048 1046 1044 10 4 2 10 4 0 103 8 10 3 6 1 0 3 4 1032 1030 1028 1026 102410281026 1026GU REDMAN LANEPEACEFUL LANEPEACEFUL LANEFILTRATION BASIN 2 100 YEAR HWL: 997. 95 176 181 1968 1972 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1920 21 22 23 24 25 26 2728 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 6364 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 159160 161 162 163 164 165 166 167168 169170 171 172 173 174 175 177 178 179 180 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 301 302 303 304 305 306 307 308309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327328 329 330 331 332 333 334 335 336 337 338339340341 342 343 344 345 346 347 348 349350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426427 428 429 430 431 432 433 434 435 436 437 438 462 1885 1886 1887 1888 1889 1890 1891 1892 1893 1894 1895 1896 1897 1898 18991900 1913 1914 1915 1916 1917 1928 1929 1930 1931 1932 1933 1934 1935 1936 1937 1938 1939 1940 1941 1942 1943 1944 1945 1946 1947 1948 1949 1950 1951 1952 1953 1954 1955 1956 1957 1958 1959 1960 1961 1962 1963 1964 1965 1966 1967 1969 1970 1971 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 19891990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 969 970 File Location: X:\4000320-00\ 001\ 40 Design\ 01 Sheets - Final Plat\TREE - INV.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3: 21: 16 PMKnow what's below.Call before you dig.R Dial 811 FORR E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O NCity Submittal 4-18- 2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeTree Perservation Plan - Enlarged - SouthTyler Stricherz TAS, MPR TLM 4000320-00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Civil Engineer under the laws of the State of Minnesota.24 27 24 N 0 SCALE IN FEET 15 30 60 www. alliant-inc. 320 File Location: X:\4000320-00\001\40 Design\01 Sheets - Final Plat\TREE - INV.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:21:19 PMFOR R E VIE W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O NCity Submittal 4-18-2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeTree Inventory ScheduleTyler Stricherz TAS, MPR TLM 4000320- 00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a 321 File Location: X:\4000320-00\001\40 Design\01 Sheets - Final Plat\TREE - INV.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:21:24 PMFOR R E VIE W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O NCity Submittal 4-18-2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeTree Inventory ScheduleTyler Stricherz TAS, MPR TLM 4000320- 00 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a 322 GU 997.62 1000 1010 994 10 1 0 100010161012 1010 1000 996 10041000 100010041006 9961026 1 0 2 2 10 2 0 10201022 101010201000998100610201030 1032 10361032103010301026102410 2 0 10 1 8 10181022101610 1 4 1008 990 992 992 1048 1046 104 4 10 4 2 10 4 0 10 3 8 10 3 6 1 0 3 4 1032 1030 1028 1026 102410281026 10261024 1020 1016 1012 1010 123 7 5 1 2 3 4 5 67 8 9 10 11 12 13 6 BLOCK 2BLOCK 2BLOCK 1 BLOCK 1 1000' Shoreland District Boundary STORMWATER WETLAND/FILTRATION NWL: 994.0 100 YEAR HWL: 999. 86 PEACEFUL LANEPEACEFUL LANE4 NEZ PERCE DRIVE PEACEFUL LANEFILTRATION BASIN 2 100 YEAR HWL:997. 95 GU PLEASANT VIEW RD REDMAN LANETROENDLE CIRCLENEZ PERCE DR 1 - RO 1 - NF 1 - BF 1 - RB 1 - SL 1 - RB 1 - RO 1 - NS 1 - RB 1 - RB 1 - AB 1 - BF 1 - NF 1 - CH 1 - RO 1 - RB 1 - AB 1 - SL 1 - NF 1 - AB 1 - CH 1 - RO 3 - WP 1 - SL 1 - AB 1 - NF 1 - CH 1 - AB 1 - RO 1 - AB 1 - SL 1 - NF 1 - RB GU 997. 62 1000 1010 994 10 1 0 100010161012 1010 1000 996 10041000 100010041006 9961026 1 0 2 2 10 2 0 10201022 101010201000998100610201030 1032 10361032103010301026102410 2 0 10 1 8 10181022101610 1 4 1008 990 992 992 1048 1046 104 4 10 4 2 10 4 0 10 3 8 10 3 6 1 0 3 4 1032 1030 1028 1026 102410281026 10261024 1020 1016 1012 1010 3 - WP 3 - BF 2 - CH 1 - SL 1 - NF 1 - AE 1 - SW 1 - RO 1 - SW 1 - NS 1 - RB 1 - CH 1 - NS 1 - SW 1 - SL 1 - SW 1 - AE 1 - AB 1 - SW 1 - AE 1 - NF 1 - RB1 - NF1 - SW1 - RO 1 - AE1 - SW1 - NS 1 - RO1 - RB 1 - AB 1 - SW 1 - NS 1 - AE 1 - AE 1 - AE 1 - SW 3 - NS 1 - AE 3 - BF 2 - WP 1 - RO 3 - CH 2 - SL 1 - AB 1 - NS 1 - WP 2 - BF File Location: X:\4000320- 00\ 001\40 Design\01 Sheets - Final Plat\LANDSCAPE.dwg Plotted By: Tyler Stricherz on April 18, 2025 at 3:21:48 PMKnow what's below.Call before you dig.RDial 811 FOR R E VI E W O N L Y PRE LI MI N A R Y NOT F O R C O N S T R U C TI O NCity Submittal 4-18-2025 Chanhassen, Minnesota Final Plat SubmittalPleasant View PointeLandscaping Planwww.alliant-inc.com PROJECT TEAM DATA QA/QC CHECK DateBy CERTIFICATION Date License no.DATEDESCRIPTIONProject No.:Drafted By:Designed By: Sheet of 4000320- 00 John Gronhovd 59233 JG TLM I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota.27 27 27 N 0 SCALE IN FEET 30 60 120 1 PLANTING NOTES: LANDSCAPE REQUIREMENTS: SEEDING NOTES: LANDSCAPE SCHEDULE: LEGEND: 1 TREE PLANTING NOT TO SCALE NOTES:1.TREE STAKING IS OPTIONAL.2.DO NOT PRUNE THE TREE AT PLANTING. PRUNE ONLY CROSSOVER LIMBS, CO- DOMINANT LEADERS AND BROKEN OR DEAD BRANCHES.3.FOR TREES IN CONTAINERS, REMOVE CONTAINER PRIOR TO PLANTING. FOR BARE ROOT TREES, PLACE TREE IN MIDDLE OF PLANTING HOLE, SPREAD ROOTS OUT RADIALLY FROM THE TRUNK AROUND THE PREPARED HOLE. PREPARE PLANTING AREA 3X THE DIAMETER OF THE ROOTBALL OR PER PLAN IF PLANTED IN A BIORETENTION OR LARGER PLANTING AREA PLACE ROOTBALL ON UNEXCAVATED OR TAMPED SOIL EXPOSE TRUNK FLARE,DO NOT PILE MULCH AGAINST TREE TRUNK MULCH RING, DIAMETER PER PLAN OR LANDSCAPE NOTES. PLACE MULCH SO NOT IN CONTACT WITH BASE OF TREE. COMPLETELY REMOVE AND DISPOSE OF ALL TWINE, ROPE AND BASKETS. DISPOSE INTO PROPER LOCATION. TAMP SOIL AROUND ROOTBALL BASE FIRMLY WITH FOOT PRESSURE SO THAT THE ROOT BALL DOES NOT SHIFT.PLANTING SOIL, BACKFILL PLACED IN 6" LIFTS GUYING PLAN SOD UNDISTURBED SUBSOIL ROOTBALL PRUNE DEAD AND BROKEN BRANCHES 16" POLY STRAP, 323 4180 Napier Ct NE Michael, MN 55376 Office: 763.424.1500 www.racheldevelopment.com Pleasant View Pointe – Final Plat/Plan Narrative To: City of Chanhassen From: Rachel Development, Paul Robinson – Development Director Date: 4/18/2025 A. Submittal Documents 1. Narrative 2. Final Plan Set (Grading, Streets, and Utilities) 3. Site Plan Rendering 4. Easement Vacation Exhibit 5. Storm Water Management Plan 6. Final Plat B. Applicant and Consultants 1. Developer – Rachel Development, Paul Robinson, Development Director 2. Builder – Charles Cudd Co., Rick Denman, Charles Cudd, Matt Olson 3. Civil Engineer(s) – Alliant Engineering - Tyler Stricherz, Mark Rausch 4. Survey – Alliant Engineering - Dan Ekrem 5. Wetland Consultant – Kjolhaug Engineering, Melissa Barrett 6. Attorneys – Larkin Hoffman, Peter Coyle, Ryan Boe C. Site Basics Land Use Plan Guiding – Low Density Residential – 1-4 units/acre Zoning – RSF Development Acres – 14.046 Owner – Beddor Enterprises, LP PID’s: 258700063, 258690130, 258710190, 258700060, and 258700062. 324 Pleasant View Pointe – Final Plat/Plans March 18, 2025 Page 2 2 D. Status - Introduction On March 4th, 2025 a public hearing was held to review the Preliminary Plat and Wetland Replacement Plans for Pleasant View Pointe. The Planning Commission recommended approval and passed the plans onto the City Council for review and approval. On March 24th, 2025 the City council approved the Preliminary Plat and wetland replacement plan with a few recommendations and changes. These have been incorporated in the final plan set and summarized below. 325 Pleasant View Pointe – Final Plat/Plans March 18, 2025 Page 3 3 E. Changes to Preliminary Plat 1. Storm Water Treatment – Pond to Constructed Storm Water Wetland – The final plans include the use of a constructed storm water wetland for treating the storm water. This was discussed and approved with the Preliminary Plat and is now in the final plan set. This constructed storm water wetland treats the storm water from the proposed Pleasant View Pointe development, a portion of Troendle Addition as well as current and future portions of Pleasant View Road. 2. Additional Storm Water Treatment Considerations - With the final plan set we addressed three comments from the City and MCWD related to areas of the property that were not previously being treated directly but were included in the final plans. a. One includes a small treatment facility created to treat the stormwater coming off the backyards of the homes on Lots 9-13 Block 2 along the steep slope. b. The second area is along the southern property line. While our Preliminary Plat met the requirements for this area the City asked if we could capture some additional storm water in this location. Our final plan includes a catch basin and storm pipe at the southern property line which is designed to capture a large portion of the drainage going south today and reroute it to and through the constructed storm water wetland system. This also includes capturing a portion of the storm water draining to this area from City water tower property. c. The third comment we addressed concerned sizing the stormwater wetland to accommodate the future re-construction of Pleasant View Road. For this we assumed a 31’ road section along with a 10’ paved trail. We also extended the Pleasant View drainage area east and west of the existing drainage area to capture as much impervious as possible to direct into our storm water wetland system. All of the changes to the storm water system are addressed in detail in the storm water report/narrative. 3. Connection to Nez Perce – As a part of the Council’s Preliminary Plat approval the Council decided that connecting Nez Perce as was initially intended was the City’s preference. This connection is now shown in the plans. The additional frontage created by this change allowed us to add one additional homesite along Nez Perce. 4. Revised Tree Preservation – Some additional tree loss is shown in the plans. This was due to a number of factors including but not limited to accommodating the Nez Perce connection, accommodating additional storm water treatment and some limited tree loss to accommodate some layout and lot type modifications. The vast majority of perimeter trees are still being saved as shown in the Preliminary Plat. 326 Pleasant View Pointe – Final Plat/Plans March 18, 2025 Page 4 4 5. Pleasant View and Nez-Perce Extensions – The final plans indicated rebuilding Peaceful Lane and a portion of Nez Perce. Exactly what that means and how it is being paid for will be resolved as a part of the final plan review and Development Agreement/Contract process. F. Plan Details Lots – 20 All lots meet or exceed RSF standards The set-backs and area requirements of the RSF are shown in the final plan set. 327 Pleasant View Pointe – Final Plat/Plans March 18, 2025 Page 5 5 G. Other Considerations Vacation of Drainage and Utility Easement – As noted in our Preliminary Plat the existing Drainage and Utility easement for the current NURP pond will need to be vacated and replacement with a new Drainage and Utility Easement encompassing the storm water wetland and related storm water components. Vacation of Right of Way (ROW) - There are a few locations where existing right of way will need to be vacated. This was also noted with our Preliminary Plat application. o Redman Lane/Peaceful vacations were approved a number of years ago but were never recorded. These will need to be recorded with our final plat. o Since Nez Perce is being relocated, the existing Nez Pearce connection that extends through the property today will also need to be vacated with the final plat/plan approval. All easements needing to be vacated are in the plan set and shown below. 328 Pleasant View Pointe – Final Plat/Plans March 18, 2025 Page 6 6 H. Builder As was discussed during our Preliminary Plat approval process, we are working with Charles Cudd Co. on this neighborhood. Below are the examples of the types homes that could be built in this neighborhood that were also shown to the City during the Preliminary Platting process. I. Closing We are looking forward moving ahead with our final plans and will work with the City to answer any questions that may remain and work out any final plan changes as needed. 329 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION IN RE: Application of Rachel Development Inc. for a twenty-lot subdivision. On May 19, 2025, the Chanhassen City Council met at its regularly scheduled meeting to consider the final plat application to subdivide 13.65 acres into twenty single-family lots and based upon the ordinances currently in place the City Council makes the following: FINDINGS OF FACT 1. On April 18, 2025, the city received a land use application for a final plat of a residential subdivision, for the property legally described in the attachment titled Exhibit A. 2. The property is currently zoned Single-Family Residential, RSF. 3. The property is guided by the Land Use Plan for Low Density Residential. 4. The Subdivision Ordinance directs the City Council to consider seven possible adverse effects of the proposed subdivision. The seven effects and our findings regarding them are: a. The proposed subdivision is consistent with the zoning ordinance; Finding: The subdivision meets all the requirements of the RSF, Residential Single- Family District and the zoning ordinance if the conditions of approval are met. b.The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; Finding: The proposed subdivision is consistent with the Comprehensive Plan and subdivision ordinance if the conditions of approval are met. c. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and stormwater 330 drainage are suitable for the proposed development; Finding: The proposed site is suitable for development subject to the conditions specified in this report. d. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; Finding: The proposed subdivision will provide adequate urban infrastructure subject to the conditions specified in this report. e. The proposed subdivision will not cause environmental damage; Finding: The proposed subdivision will not cause significant environmental damage subject to the conditions of approval. The proposed subdivision contains adequate open areas to accommodate house pads. f. The proposed subdivision will not conflict with easements of record; and Finding: The proposed subdivision will not conflict with existing easements, but rather will expand and provide all necessary easements. g. The proposed subdivision is not premature. A subdivision is premature if any of the following exists: 1) Lack of adequate stormwater drainage. 2) Lack of adequate roads. 3) Lack of adequate sanitary sewer systems. 4) Lack of adequate off-site public improvements or support systems. Finding: The proposed subdivision will have access to public utilities and streets if the specified conditions of approval are met. 5. The planning report Planning Case 2025-02, dated May 14, 2025, prepared by Rachel Arsenault, et al, is incorporated herein. DECISION The City Council approves the final plat based on the findings of fact included herein, and subject to the conditions of the staff report. ADOPTED by the Chanhassen City Council this _____ day of _____________, 202_. 331 CHANHASSEN CITY COUNCIL BY:___________________________________ Mayor, Elise Ryan BY:___________________________________ City Manager, Laurie Hokkanen 332 EXHIBIT A PID #258710190 (955 Pleasant View Road) All of Lot 1 and that part of Lot 2, Block 3, "Vineland Forest", Carver County, Minnesota, lying Northerly of a line drawn from a point on the East line of said Lot 2 a distance of 53.53 feet North of the Southeast corner of said Lot 2 to a point on the West line of said Lot 2 distant 66.00 feet North of the Southwest corner of said Lot 2 and there terminating. PID # 258700060 (6535 Peaceful Lane) That part of Lots 5 and 6, “Vineland”, described as follows: Commencing at the southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the south line of said Lot 5, a distance of 168.62 feet to the actual point of beginning of the tract of land to be herein described; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East 129.57 feet; thence South 89 degrees 16 minutes 34 seconds East 160.63 feet; thence North 0 degrees 43 minutes 26 seconds East 96.01 feet to the actual point of beginning, Carver County, Minnesota. Together with an easement for ingress and egress over and across that part of Lot 5, “Vineland”, Carver County, Minnesota lying Westerly of the following described line: Commencing at the southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the south line of said Lot 5 a distance of 168.62 feet; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East a distance of 32.57 feet, more or less, to a point on the south line of said Lot 5, which point is the point of beginning of the line to be described; thence on a line running North 7 degrees 25 minutes 34 seconds West a distance of 160 feet, more or less, to the intersection of said line with the westerly lot line of said Lot 5, and there terminating. And That part of Lots 5 and 6, "Vineland", Carver County, Minnesota, described as follows: viz: That part of the South 45.25 feet of Lot 5 and of the North 96.01 feet of Lot 6, "Vineland" lying Easterly of a line drawn perpendicular to the South line of said Lot 5 from a point on said South line distant 168.62 feet Westerly along said South line from the Southeast corner of said Lot 5. PID # 258700063 (No Address Assigned) Lot 5, Vineland, Carver County, Minnesota, except that part thereof described as follows, viz: Commencing on the Southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the South line of said Lot 5 a distance of 168.62 feet to the actual point of beginning of the parcel being described; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East a distance of 32.57 feet, more or less, to a point on the South line of said Lot 5 (hereinafter referred to as “Point A”); thence Easterly along the South line of said Lot 5 to the point of beginning. Subject to an easement for ingress and egress and utility purposes, appurtenant to and for the benefit of the above described Exception, which said easement is described as all that part of said Lot 5, Vineland, lying Westerly of the following described line: Beginning on the South line of said Lot 5 described above as “Point A”; thence on a line running North 7 degrees 25 minutes 34 seconds West a distance of 160 feet more or less, to its intersection with the Westerly line of said Lot 5 and there terminating. Also excepting from said Lot 5 that part thereof described as follows, viz: A 50.00 foot strip of land over and across Lot 5, Vineland, Carver County, Minnesota, the centerline of said strip is described as follows: Commencing at the Northeast corner of Lot 5; thence South 00 degrees 24 minutes 03 seconds East, on an assumed bearing, along the East line of Lot 5, a distance of 380.86 feet to the point of beginning of the centerline to be described; thence Westerly, a distance of 29.21 feet along a non-tangential curve concave to the South, said curve having a radius of 198.13 feet, a central angle of 08 degrees 26 minutes 53 seconds and a chord bearing of North 71 degrees 56 minutes 25 seconds West; thence North 76 degrees 09 minutes 51 seconds West tangent to last described curve, a distance of 170.81 feet; thence Northwesterly, a distance of 124.92 feet, along a tangential curve concave to the Northeast, said curve having a central angle of 39 degrees 52 minutes 333 43 seconds and a radius of 179.48 feet to a point hereinafter referred to as “Point B”; thence continue Northwesterly and Northerly along the last described curve a distance of 124.92 feet and said centerline there terminating. Also excepting, a 50.00 foot strip of land over and across said Lot 5, Vineland, the centerline of said strip is described as follows: Beginning at the above described “Point B”; thence South 53 degrees 42 minutes 49 seconds West, a distance of 100.00 feet and said centerline there terminating. PID #258700062 (No Address Assigned) Lot 6, Vineland, Carver County, Minnesota, except that part thereof described as follows, viz: Commencing at the Northeast corner of said Lot 6, thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the North line of said Lot 6, a distance of 168.62 feet to the actual point of beginning of the land to be described; thence South 0 degrees 43 minutes 26 seconds West a distance of 96.01 feet; thence North 89 degrees 16 minutes 34 seconds West a distance of 160.63 feet; thence North 7 degrees 25 minutes 34 seconds West a distance of 97.00 feet to the North line of said Lot 6; thence Easterly along the said North line of Lot 6 to the point of beginning. Excepting from said Lot 5 and said Lot 6 the following described premises: That part of the South 45.25 feet of Lot 5 and of the North 96.01 feet of Lot 6, “Vineland” lying Easterly of a line drawn perpendicular to the South line of said Lot 5 from a point on said South line distance 168.62 feet Westerly along said South line from the Southeast corner of said Lot 5. And Lot 7, Vineland, Carver County, Minnesota, except that part of said Lot 7 described as follows, viz: Commencing at the Southwest corner of Lot 7, Vineland; thence North 1 degree 53 minutes 49 seconds East a distance of 76.37 feet to a point on the Southeasterly line of Peaceful Lane; thence North 36 degrees 53 minutes 34 seconds East along said Southeasterly line of Peaceful Lane a distance of 174.79 feet; thence South 87 degrees 50 minutes 55 seconds East a distance of 294.35 feet; thence South 1 degree 03 minutes 23 seconds West a distance of 220.04 feet to the Southerly line of said Lot 7; thence South 87 degrees 50 minutes 55 seconds West along said Southerly line of Lot 7 a distance of 397.82 feet to the point of beginning. Together with an easement appurtenant to the foregoing Parcels 2, 3 and 4 for ingress and egress over and across that part of Lot 5, Vineland, Carver County, Minnesota lying Westerly of the following described line: Commencing at the Southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the South line of said Lot 5 a distance of 168.62 feet; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East a distance of 32.57 feet, more or less, to a point on the South line of said Lot 5, which point is the point of beginning of the line to be described; thence on a line running North 7 degrees 25 minutes 34 seconds West a distance of 160 feet, more or less, to the intersection of said line with the Westerly lot line of said Lot 5, and there terminating. PID #258690130 (1015 Pleasant View Road) Outlot A, Troendle Addition, Carver County, Minnesota. All Abstract Property 334 Application: Final Plat. (Planning Case #2025-02) Staff Report Date:May 14, 2025 Drafted By:Rachel Arsenault, Associate Planner Joe Seidl, Water Resources Engineer Mackenze Grunig, Project Engineer City Council Review Date: May 19, 2025 SUMMARY OF REQUEST:The Applicant is requesting final plat approval to subdivide the property at and around 6535 Peaceful Lane into twenty lots. LOCATION:955 Pleasant View Road, 1015 Pleasant View Road, & 6535 Peaceful Lane PID: 258710190, 258690130, 258700063, 258700060, & 258700062 APPLICANT:Rachel Development, Inc. PROPERTY OWNER:Beddor Enterprises, LLP PRESENT ZONING:Single-Family Residential, RSF 2040 LAND USE PLAN:Residential – Low Density (1.2 – 4.0 units/net acre) ACREAGE:13.65 Acres DENSITY:1.46 Units/Acre PROPOSED MOTION: “The Chanhassen City Council approves the requested final plat for the subdivision on Pleasant View Road subject to the conditions of approval and adopts the attached Findings of Fact and Decision.” 335 Page 2 of 15 LEVEL OF CITY DISCRETION IN DECISION-MAKING: The city’s discretion in approving or denying a final plat is limited to whether or not the proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these standards, the city must approve the final plat. This is a quasi- judicial decision. COMMUNITY ENGAGEMENT Notice of the prior public hearing for the preliminary plat was mailed to all property owners within 500 feet. The applicant held a neighborhood meeting on July 31st, 2024. This neighborhood meeting was conducted entirely by the Applicant to gather feedback from adjacent property owners prior to the City Council workshop on October 14 th, 2024. The preliminary plat, variance, and wetland alteration permit went to Planning Commission on March 4th, 2025, and City Council on March 24th, 2025. APPLICABLE REGULATIONS Chapter 18, Subdivision Chapter 20, Article XXII, RSF Single-Family Residential District PROPOSAL/SUMMARY The Applicant is proposing the subdivision of 13.65 acres of properties, zoned Single-Family Residential and guided for Low-Density Residential into twenty lots. HISTORY The properties are divided into three prior plats: Vineland, Vineland Forest, and Troendle Addition. First is the historical Vineland plat in 1887; due to the age of this plat, the roads do not match currently existing, nor do the street names. The scale of the area it once included is unknown due to the missing measurement units. Four of the parcels included in this subdivision and the water tower parcel next door have not been replatted since this plat. The next plat is the Vineland Forest platted in 1990. There is only one parcel in the proposed new subdivision that is from this plat, and it has since gone through a lot line adjustment and lot combination in 1996. The final plat Troendle was platted in 1991; one parcel in the new proposed subdivision is included in this previous plat as an outlot. As a condition of the Troendle plat approval the developer was required to create a temporary cul-de-sac with a sign affixed at the end notifying residents of the future extension of Nez Perce. Additionally, the developer was required to place a notice on each lot’s chain of title that Nez Perce will be ultimately extended as a through street to Pleasant View. These conditions were due to the fact the plat included a dead-ending cul-de-sac 1,400 feet long. The requirements at the time of approval were vague, 336 Page 3 of 15 stating the maximum length of a dead end shall be determined as a function of the expected development density along the street, thus resulting in the conditions of approval. City Code section 18-III-(7) states that one or two family residential developments where the number of dwelling units exceeds 30 shall be provided with two separate and approve fire apparatus access road, and shall meet the requirements of section 18-57(u)(4)(iii) with the following exceptions: 1. Where there are more than 30 dwelling units on a single public or private fire apparatus road and all dwelling units are equipped throughout with an approved automatic sprinkler system in accordance with section 903.3.1.1, 903..3.1.2, or 903.1.3 of the International Fire Code, access from two directions shall not be required. 2. The number of dwelling units on a single fire apparatus road shall not be increased unless fire apparatus access roads will connect with future development, as determined by the fire code official. Currently Nez Perce/Troendle Circle and Vineland Court have 33 homes on a single fire apparatus road which was approved based upon the potential for a future secondary access with future development of the Beddor property which is currently contemplated for development. If Nez Perce does not connect to Peaceful Lane as a result of development of the Beddor property, the existing 33 homes will no longer be in compliance with Chapter 18 of the Chanhassen city code. Environmental Protection Districts Wetland Protection – There are two wetlands on this property. Bluff Protection – There is a bluff on the SW corner of the property. Shoreland Management – Lots 1-6, Block 1 are within this district. Floodplain Overlay – Not within FEMA Flood Zones 2018. SUBDIVISION REVIEW There are 20 lots proposed in this subdivision along with extended right-of-way for Peaceful Lane and Nez Perce Drive. COMPLIANCE TABLE Parcel Area Frontage Depth Lot Cover Notes B1-L1 38,635.09 147.02 270.97 9,658.77 B1-L2 32,612.86 177.1 250.28 8,153.21 B1-L3 30,196.91 190.87 192 7,549.22 B1-L4 27,225.02 132.8 242.37 6,806.25 337 Page 4 of 15 B1-L5 30,659.5 118.32 280.91 7,664.87 Double Frontage B1-L6 36,216.68 104.12 351.06 9,054.17 Double Frontage B1-L7 60,631.67 196.69 297.22 15,157.91 B2-L1 19,780.88 103 170.08 5,934.26 Corner Lot B2-L2 19,507.25 112.49 175 5,852.17 B2-L3 19,727.72 109.26 181.5 5,918.31 B2-L4 19,758.51 114.08 175.87 5,927.55 B2-L5 19,926.25 118.49 133.5 5,977.87 B2-L6 24,654.92 90.01 147.28 7,396.47 B2-L7 23,133.74 90.01 147.28 6,940.12 B2-L8 18,281.55 114.48 125.19 5,484.46 B2-L9 46,604.18 92.22 421.71 13,981.25 B2-L10 32,804.7 90.2 367.72 9,841.41 B2-L11 27,092.45 90.28 304.64 8,127.73 B2-L12 22,069.86 90.48 244.93 6,620.95 B2-L13 26,628.59 150.12 184.07 7,988.57 Setbacks: Front - 30 ft., Side - 10 ft., Rear - 30 ft. Staff notes that the proposal is consistent with the Comprehensive Plan and the Zoning Ordinance. LANDSCAPING The developer is proposing to remove the existing trees in areas to be graded and plans to save the trees around the perimeter of the lots and development as a whole. The plans for development include canopy calculations to establish the number of replacement trees required to be planted per city code, currently 96 trees will need to be planted, these are shown on the landscaping plan. 338 Page 5 of 15 The landscaping plan dated 04-18-2025 adheres to the City’s species diversity requirements which states that the landscaping plan shall consist of no more than 10% of the trees can be from one tree species, no more than 20% of the trees can be from one genus, and no more than 30% of the trees can be from one family. ROADS The development proposes a road extension of Peaceful Lane which connects to Pleasant View Road. It also shows an extension of Nez Perce Drive to Peaceful Lane. The City of Chanhassen 2040 Comprehensive Plan includes a chapter focused on transportation. Within that chapter is a section on local street improvements which includes the “Nez Perce/Pleasant View Road Connection” as an improvement. That section of the Comprehensive Plan states as follows: “During review of the Vineland Forest plat, it was evident that a connection between Nez Perce/Lake Lucy Road and Pleasant View Road was warranted since there was no north- south connection between Powers Boulevard (CSAH 17) and Lotus Lake. Improved access is needed for local trips and to ensure the adequate provision of emergency services. At the same time, there were concerns voiced regarding the introduction of additional trips onto Pleasant View Road since the street already suffers from capacity and design constraints. Therefore, it was determined that the Pleasant View Road intersection should be located as far west as possible at the Peaceful Lane Intersection.” 339 Page 6 of 15 Based on the information included within the City’s Comprehensive Plan, the proposed final plat for Pleasant View Pointe is shown with the Nez Perce Drive extension to Peaceful Lane which connects to Pleasant View Road. The resulting cul-de-sac of Peaceful Lane is measured at approximately 540 feet. City Code allows for cul-de-sacs up to 750 feet in length. As shown the roadway network proposed with the Final Plat is consistent with the City’s Comprehensive Plan and the previously approved Preliminary Plat. PROJECT OVERVIEW The Applicant is requesting final plat approval to subdivide the property at and around 6535 Peaceful Lane into twenty lots. Construction plans developed by Alliant Engineering Inc. dated April 18,2025 were reviewed by staff. GRADING & DRAINAGE The project site is located south of Christmas Lake and consists of five parcels with one single family residence located onsite along with a driveway, and outbuildings. The project site is bounded by Pleasant View Road to the north, Peaceful Lane to the West and single-family homes on the South and East. In the existing condition the majority of the surface runoff from the site flows into the pond/wetland on the northern portion of the site. This pond/wetland drains west through an 8 inch culvert into a wetland complex east of Powers Blvd. Runoff from the wetland/pond ultimately drains to Christmas Lake through a series of wetlands, stormwater ponds, and stormwater infrastructure. A small portion of the site drains to the east between existing homes into public storm sewer on Troendle Circle which ultimately drains into the pond/wetland located onsite. A small portion of the site drains south through properties located on Lake Lucy Road and ultimately drains to Lake Susan thought a wetland complete east of Powers Blvd. In the proposed condition the site would be mass graded to facilitate the construction of public roads, utilities and homes. The proposed drainage remains similar to existing conditions. The majority of the site will be captured and routed by storm sewer and drainage swales to the proposed stormwater management BMP located where the existing pond/wetland is today. Drainage from the Troendle Addition will be routed to the proposed stormwater wetland/filtration basin. A small portions of the site that are not routed to the stormwater basin would sheet flow west, south, and east similar to that in existing conditions. The portion that flows west is directed to a proposed filtration basin. The southern portion is caught by storm sewer and routed to the proposed BMP. The proposed conditions are capturing runoff from portions of Peaceful Lane and Pleasant View Road and routing the stormwater to the stormwater wetland/filtration basin via storm sewer. The proposed impervious treatment for the development is accounting for the maximum impervious for each lot. The proposed design uses backyard drains to collect and direct stormwater from the south and east areas of the site. However, this approach requires very deep storm sewers, which are difficult and expensive to install and maintain. It would also necessitate larger drainage and 340 Page 7 of 15 utility easements along side yards to allow for future reconstruction of the system. As an alternative, some stormwater from the south side of the project could be routed to the City's stormwater system on Lake Lucy Road. A private BMP may be required to meet stormwater quality standards for runoff leaving the site. As such, the applicant shall work with City staff to improve the stormwater design to ensure it can be maintained within the subdivision's easements. EROSION CONTROL The proposed development will impact one (1) acre of disturbance and will, therefore, be subject to the General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit). A Surface Water Pollution Prevention Plan (SWPPP) was included in the plat submittal. The SWPPP is a required submittal element for final plat review along with the Erosion and Sediment Control Plan (ESCP) in accordance with Section 19-145 of City Ordinance. No earth disturbing activities may occur until an approved SWPPP is developed. This SWPPP shall be a standalone document consistent with the NPDES Construction Permit and shall contain all required elements of the permit. The SWPPP will need to be updated as the plans are finalized, when the contractor and their sub-contractors are identified and as other conditions change. An approved SWPPP shall be submitted prior to recording the final plat. All erosion control shall be installed and inspected prior to initiation of site grading activities. WETLANDS The proposed plans show two (2) wetlands onsite that were delineated by Kjolhaug Environmental Services on July 3, 2024. The delineation was approved by the City of Chanhassen in its role as the local governing unit (LGU) that is responsible for administering the Wetland Conservation Act (WCA). The Technical Evaluation Panel (TEP) made up of representatives from the city, Watershed District, MN Department of Natural Resources (DNR), Board of Water and Soil Resources (BWSR), and Carver County Soil and Water Conservation District (SWCD) are all part of the WCA process in reviewing wetland applications including types and boundaries. The Wetland types and sizes on site were determined to be: Wetland 1 - 0.08 acre wetland meadow depression Wetland 2 – 0.67 acre wet meadow of which 0.16 areas are historic and governed by WCA The applicant submitted a no-loss application which asserted that Wetland 2 was manmade and therefore incidental. Portions of Wetland 2 were determined to be an incidental wetland by the TEP. It was determined that earth moving activities associated with past projects onsite modified the area and altered the wetland, however there were areas of historic wetland that while altered still have wetland characteristics today and are therefore governed by WCA regulations. As such only 0.16 acres of wetland 2 is governed by WCA regulations. During the design process the applicant’s Engineer discovered the grading plans associated with the Troendle Addition that showed that Wetland 1 was likely created with the grading of the 341 Page 8 of 15 subdivision. As such, the LGU and TEP support the determination that wetland 1 is incidental. The findings will be memorialized with a formal WCA decision processed concurrently with the sequencing application. The proposed plan would fill wetlands 1 and 2. The grading and filling over the wetlands would facilitate the construction of the homes and stormwater treatment best management practices (BMPs), associated with the development. WCA regulations and City Ordinance were created to protect wetlands because of their value as a water resource and their numerous benefits to the surrounding area (water quality, flood mitigation, wildlife habitat, etc.). The main principles of the WCA are to avoid wetland impacts, then minimize impacts, and finally replace filled wetlands where wetland altering activities could not be avoided. The process of filling wetlands and showing the avoidance and minimization are defined in State Statue 8420 and submitted to the LGU as a Joint Permit Sequencing Application. The applicant must secure permits for the wetland impacts from the LGU prior to construction. The applicant submitted a sequencing application with the preliminary plat application which was reviewed by the TEP. The sequencing application outlines why the applicant needs the specific design, alternative designs reviewed, and actions to minimize wetland impacts. The application and review are a rigorous process. The original application was determined to be deficient with regards to demonstrating the need for the project and the quality of the avoidance and minimization alternatives provided. Staff met with the applicant to outline initial comments and requested an updated and more robust application focusing on the engineering challenges of why the wetlands could not be designed around. An updated application was submitted on January 29, 2025. The updated application focused on the water quality benefit of the proposed revised constructed wetland treatment BMP. The TEP reviewed the updated application and discussed findings during a coordination meeting on February 14th. Remaining comments were sent over to the applicant on February 17th. The applicant revised the submittal and sent over additional review materials on February 21st and 24th that answered most of the TEP’s questions. The City requested a design modification which would minimize impacts to the historic wetland area which the applicant’s Engineer completed (scenarios 1 and 2). This area would remain as a shallow pond type wetland that would function in similar fashion as it does today. The applicant also sent over a draft maintenance proposal for the native vegetation around the BMP which outlines that an HOA would be created for this purpose. 342 Page 9 of 15 Scenario 2 Schematic Scenario 2 Grading 343 Page 10 of 15 The applicant’s preferred design (scenario 2) would fill a small portion of the historic wetland but the majority would not be graded. Additionally, the constructed wetland proposed would result in higher pollutant removals than other options reviewed and would be a net benefit to local water quality. Scenario 2 would likely increase the amount of untreated stormwater drained through the historic wetland, as such it would still result in a permanent wetland impact which requires mitigation with the purchase of wetland banking credits. The applicant’s Joint Permit Application did outline the purchase of wetland banking credits. Impacting wetlands in Chanhassen requires a wetland alteration permit as defined in Article VI, Chapter 20 of City Ordinance which must be approved by City Council. The intent of this section of code was to give the city additional control of wetland impacting activities within the city of Chanhassen and ensure that the WCA was followed by all activities that could impact wetlands. The applicant revised the concept stormwater wetland design to address the TEPs comments. The concept design and wetland alteration permit were approved the City Council on the March 24, 2025 Meeting. The City of Chanhassen issues a notice on decision on April 14, 2025 that approved the sequencing application. As part of the application the applicant is purchasing wetland banking credits to offset the impacts to wetland 2. The entire historic portion of wetland two is being mitigated for because of the water quality secondary impacts to the wetland. STORM WATER MANAGEMENT Article VII, Chapter 19 of City Code describes the required storm water management development standards. Section 19-141 states that “these development standards shall be reflected in plans prepared by developers and/or project proposers in the design and layout of site plans, subdivisions and water management features.” These standards include abstraction of runoff and water quality treatment resulting in the removal of 90% total suspended solids (TSS) and 60% total phosphorous (TP). The proposed project is located within the Minnehaha Creek Watershed District (MCWD) and is therefore subject to the watershed’s rules and regulations. A Stormwater Management Report was submitted for review to confirm all applicable stormwater management requirements are being met. This includes rate control, volume abstraction and water quality requirements among others. All comments on the proposed design from both the city and MCWD will need to be addressed. The applicant shall provide final versions of all modeling (HydroCAD and MIDS) and Stormwater Management Report to address remaining comments and confirm rate, volume and water quality requirements are met as part of the final plans. Additionally permit approval from the watershed district shall be provided with the final plans to confirm the design is meeting all applicable stormwater management requirements prior to the commencement of construction activities. The applicant is proposing to meet stormwater regulations with the construction of a stormwater wetland/filtration basin stormwater best management practice (BMP) located on the northwest corner of the site where the existing pond/wetland is located and a filtration basin on the west side of the site. The BMP is located within an existing drainage and utility 344 Page 11 of 15 easement (D&U) that serves to protect the existing pond/wetland located in the area. The existing easement is larger than the current area of the pond/wetland. There are limited opportunities for stormwater management in this part of Chanhassen. The proposed stormwater management facilities onsite are oversized to provide treatment for the future Pleasant View Road reconstruction project which is scheduled for 2026-2027 construction. The applicant included 9,656 cf of treatment volume for the future construction Peaceful Lane (10,071sf of impervious) and for Pleasant View Road (47,867 sf of impervious). The existing easement will need to be vacated by the city and then reconfigured. In order to approve the use of the existing D&U for the subdivision drainage the applicant must demonstrate that the proposed design is appropriately oversized to accommodate the existing and future stormwater management needs of the city. The applicant shall update the stormwater management sizing analysis with the final plans The analysis shall be submitted with the final plans and must be approved by the watershed district prior to recording the final plat. There are several minor issues that need to be addressed in the design of the stormwater wetland/filtration basin BMP and the filtration basin located on the west portion of the site. Currently, the stormwater wetland does not fully drain within 48 hours, which does not meet performance standards. Expanding the filtration area may be necessary to achieve this drainage requirement. The proposed design falls short of the City’s 3-foot freeboard requirement for Block 1, Lot 6 by 0.06 feet. This issue can likely be resolved through minor grading adjustments. The placement of the drain tile pipes, cleanouts, and outlet control structures presents accessibility challenges for City maintenance staff. An alternative routing option is included in the engineering plan comments. The outlet pipe from the stormwater wetland is currently located where the existing outlet is, near the top of a hill - which has led to the formation of an eroded, incised channel between the outlet and the downstream wetland/pond. A more effective design would extend the outlet pipe to discharge at the normal water level of the receiving water body, though other solutions may also be appropriate. The west filtration basin will need a defined access for maintenance. Stormwater from the development is proposed to be directed down a steep slope from the rear yards of Block 2 Lots 8-12. This configuration has a high risk of causing erosion problems that could impact the functionality of the filtration basin. As such, the applicant shall work with City staff to improve the stormwater design and resolve staff’s concerns. The proposed wetland/filtration BMP system shown in the final plat construction plans will be publicly owned and maintained. The filtration basin located on the west side of the develop does not manage stormwater from the ROW and therefore is private. Furthermore, there may be the need for additional private stormwater infrastructure with the final plans. A maintenance plan for any proposed BMPs will be required and should include the maintenance 345 Page 12 of 15 schedule, responsible party, and should include information on how the system will be cleaned out as necessary. The applicant shall submit a stormwater operations and maintenance plan as part of the final plans. The stormwater operations and maintenance plan shall be recorded concurrently with the development contract. RECOMMENDATION Staff recommends approving the final plat and development contract subject to the conditions of approval and adopts the attached Findings of Fact and Decision. __________________________________________________________ APPLICATION REVIEW COMMENTS PLANNING: 1. Conservation signage shall be required to be placed along the boundary of the stormwater facility south of Pleasant View Road encompassing portions of proposed lots 3, 4, 5, 6, and 7 of Block 1. Signage shall be placed on a post no smaller than 4"x4" with a concrete footing and the location of signage is at the sole discretion of the city.Condition Remains. 2. Applicant shall update corresponding plan sheets including the cover sheet, demolition plan, preliminary plat, grading and drainage plan, grading profiles, erosion and sediment control plan, sanitary sewer and watermain plan, storm sewer plan, wetland management plan, tree preservation plan, tree inventory schedule, and landscaping plan based upon the updated site plan which extends Nez Perce Drive through the proposed development and connects to Peaceful Lane. Condition Met. 3. A public sidewalk may be required along Peaceful Lane and Nez Perce Drive at the sole discretion of the city. The city will assess this improvement with final design plans. Condition no longer applies. FORESTRY 1. Developer must update the tree survey to include condition of all significant trees. A significant tree is defined as any healthy tree species measuring 12 inches or more DBH; or any health coniferous tree measuring 12 feet in height or more.Condition Updated. 2. Developer must add tree protection fencing symbols to the legend on the Tree Preservation plan sheet.Condition Remains. 3. Ash trees that are marked to be saved must be inspected by the Environmental Resources Specialist.Condition Remains. 4. Developer shall place the delineated bluff into a conservation easement. This area shall be excluded from the surface water development fee.Condition Added. ENGINEERING: 1. The developer shall enter into Encroachment Agreements for all private improvements located within public drainage and utility easements or right-of-way, as approved by the City Engineer, prior to issuance of building permits.Condition Remains. 346 Page 13 of 15 2. Any previously recorded easements located within proposed public right-of-way or proposed public drainage and utility easements must be vacated prior to or concurrently with the final plat.Condition Remains. 3. Final plans shall include current City Standard Details, including the 2025 Typical Residential Street Section plate. Standard Details have been uploaded to the City website. Condition Updated. 4. All sheets shall be signed by a licensed engineer. Condition Added. 5. Dedicate jog with R/W for Block 1 Lot 1, Lot 5, Lot 6, & Lot 7 along Pleasant View Rd to the City. Condition Updated. 6. Coordinate street lighting with the local utility. The Developer shall select “Standard Service”. Condition Added. 7. Lot 1 grading contours do not tie into existing residential lot to the East. Condition Met. 8. Provide D&U Easement over drainage swales where applicable. Condition Met. 9. If there are retaining walls with this project, they shall be HOA or privately owned. Condition Remains. 10. The Developer and their Engineer must amend the construction plans, to fully address construction plan comments and concerns. Final construction plans will be subject to review and approval by staff prior to the recording of the final plat.Condition Remains. 11. The Developer will be required to clean & televise all sanitary sewer at connection point and submit the CCTV footage and reporting to the City Engineer for review prior to paving. Condition Remains. 12. Many typical details were not included in the plans. Engineer to show private services, pipe profiles, pipe sizes, grade of existing driveway tie-in. Condition no longer applies. 13. Address the drainage issue affecting Lot 6 where drainage is trapped in the corner of the plat. Condition Updated. 14. Developer to remove water main and sanitary sewer pipe and structures along Redman Lane R/W that no longer is necessary. Condition Remains. 15. Developer shall coordinate relocations & installations with private utilities prior to final restoration and wear pavement. Condition Updated. 16. Include construction plan sheets for both the connection of Peaceful Lane to Pleasant View Road and the full-depth reclamation of Nez Perce Drive. Extend watermain removal and replacement to Pleasant View watermain.Condition Added. 17. Remove the “Ped Ramp" call out on sheet 7. Condition Added. 18. Extend remove and replacement of existing driveway for 6500 Peaceful Ln. near the right of way. Condition Added. 19. Adjust proposed alignment watermain along Nez Perce Dr. so it does not fall under the curb line. Condition Added. 20. The existing sanitary sewer service for Block 1, Lot 4 shall be televised. Footage shall be submitted to the City Engineer for review prior to making the connection. Condition Added. 21. Connect 6500 Peaceful Ln. sewer and water services to the new mains.Condition Added. 22. Consider adding a hydrant to serve for fire protection for 6500 Peaceful Ln. Condition Added. 347 Page 14 of 15 23. Relocate the tracer wire access box for Sanitary Manhole No. 5 directly over the new sewer pipe. Condition Added. 24. Sanitary sewer pipe run from MH 4 to MH 3 is under 0.5%. Adjust pipe slope to meet the required minimum 0.5%. Condition Updated. 25. Move miscellaneous storm sewer profiles to a separate sheet to ensure record plan legibility. Condition Added. 26. Provide an additional 5 feet of drainage and utility easement on both sides of the storm sewer pipe from CB 210 to CBMH 209, and from CB 213 to MH 212.Condition Added. 27. Adjust the rip rap shown at 6500 Peaceful Ln. to not encroach into the property line. Condition Added. 28. On Sheet 19, Notes No. 2. Add a reference to the City standard detail plate. Condition Added. 29. Ensure that the existing CB-3 is located outside of the proposed curb line and not within the driveway for Lot 5.Condition Added. 30. There is existing drain tile within Nez Perce Dr. Connect to existing drain tile with the proposed drain tile. Condition Added. 31. Developer shall apply for and receive all permits required for the improvements. These include and are not limited to MDH Watermain Extension Permit, MPCA Sanitary Sewer Extension Permit, and MCES Sanitary Sewer Permit. Condition Added. 32. Plans currently show connection to an existing CMP pipe on Redman Lane. Replace this pipe as part of the project.Condition Added. 33. Address erosion concerns at proposed FES 100. Consider extending the FES to the pond and coordinate any required easement with the City. Condition Added. 34. Pad layouts do not appear to include 6” of topsoil over entire site. Include comment on all hold down details to call out 6’ of topsoil.Condition Added. 35. Plans can reduce watermain size from the Nez Perce Dr intersection to the cul-de-sac down to 6” PVC C900 if desired.Condition Added. 36. Move proposed streetlight to lot line 4 & 5 at cul-de-sac and verify mailboxes are not installed within the cul-de-sac.Condition Added. 37. EXCB 3 shall remain a catch basin in the curb line. Adjust proposed driveway outside of the impact of the catch basin. Condition Added. 38. Review the sight triangle at Nez Perce Drive and Peaceful Lane to ensure proposed trees do not obstruct driver visibility.Condition Added. 39. Developer shall straighten alignment between STA 3+00 & 4+00 on Peaceful Ln. Include a curve and line table for review. Condition Added. WATER RESOURCES: 1. The developer shall enter into a development contract with the City and provide necessary financial security to guarantee compliance with the terms of subdivision approval and construction of infrastructure onsite. (Condition still applies) 2. It is the developer’s responsibility to ensure that permits are received from all other agencies with jurisdiction over the project (i.e. Carver County, MCWD, Board of Water and Soil Resources, MnDOT, etc.) prior to the commencement of construction activities. (Condition still applies) 348 Page 15 of 15 3. The developer and their Engineer shall work with City staff in amending the construction plans, dated April 18, 2025 prepared by Alliant Engineering, Inc., to fully satisfy construction plan comments and concerns. Final construction plans will be subject to review and approval by staff prior to recording final plat. (Condition modified for clarity) 4. An analysis of stormwater treatment shall be updated and submitted with the final plans that verifies that the design meets the existing and future needs of the City. The treatment volume shall be noted and broken down into what is provided for the existing condition, proposed subdivision, and future roadway projects. The analysis must be approved by the watershed district and memorialized prior to recording the final plat. (Condition modified for clarity) 5. The applicant shall secure a wetland alteration permit and associated joint permit sequencing application prior to or in conjunction with the final plat approval. (Condition satisfied) 6. An Operations and Maintenance plan for all proposed BMPs including the inspection frequency, maintenance schedule, and responsible party shall be submitted with the final plans and recorded concurrently with the final plat.(Condition modified for clarity) 7. The applicant shall work with staff to optimize the drainage design and verify that stormwater runoff to the south meets stormwater management standards. (Condition modified for clarity). 8. The applicant shall revise the design and provide a memo which verifies that the development will not adversely impact the drainage of adjacent properties. (Condition no longer applies) 9. The applicant shall provide updated H&H and water quality modelling with the final plans submittal. (Condition modified for clarity) 10. The applicant shall secure condition approval from the watershed district prior to submitting the final plat application to the City. Verification of conditional approval shall be provided with the final plat application.(Condition no longer applies) BUILDING: 1. Building plans must provide sufficient information to verify that proposed building meets all requirements of the Minnesota State Building Code, additional comments or requirements may be required after plan review. Condition Remains. 2. Building permits must be obtained before beginning any demolition or construction. Condition Remains. 3. Private retaining walls, if present, more than four feet high, measured from the bottom of the footing to the top of the wall, must be designed by a professional engineer and a building permit must be obtained prior to construction. Retaining walls, if present, under four feet in height require a zoning permit. Condition Remains. 4. A building permit must be obtained prior to demolishing any structures on the site. Condition Remains. 5. A final grading plan and soils report must be submitted to the Inspections Division before building permits will be issued. Condition Remains. 349 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA PLEASANT VIEW POINTE DEVELOPMENT CONTRACT (Developer Installed Improvements) 350 i TABLE OF CONTENTS SPECIAL PROVISIONS PAGE 1.REQUEST FOR PLAT APPROVAL............................................................................SP-1 2.CONDITIONS OF PLAT APPROVAL........................................................................SP-1 3.DEVELOPMENT PLANS............................................................................................SP-1 4.IMPROVEMENTS........................................................................................................SP-2 5.TIME OF PERFORMANCE.........................................................................................SP-2 6.SECURITY....................................................................................................................SP-2 7.NOTICE.........................................................................................................................SP-3 8.OTHER SPECIAL CONDITIONS................................................................................SP-3 9.GENERAL CONDITIONS ...........................................................................................SP-5 GENERAL CONDITIONS 1.RIGHT TO PROCEED.................................................................................................GC-1 2.PHASED DEVELOPMENT ........................................................................................GC-1 3.PRELIMINARY PLAT STATUS................................................................................GC-1 4.CHANGES IN OFFICIAL CONTROLS.....................................................................GC-1 5.IMPROVEMENTS.......................................................................................................GC-1 6.IRON MONUMENTS..................................................................................................GC-2 7.LICENSE......................................................................................................................GC-2 8.SITE EROSION AND SEDIMENT CONTROL.........................................................GC-2 8A.EROSION CONTROL DURING CONSTRUCTION OF A DWELLING OR OTHER BUILDING.........................................................................................GC-2 9.CLEAN UP...................................................................................................................GC-3 10.ACCEPTANCE AND OWNERSHIP OF IMPROVEMENTS....................................GC-3 11.CLAIMS .......................................................................................................................GC-3 12.PARK DEDICATION..................................................................................................GC-3 13.LANDSCAPING..........................................................................................................GC-3 14.WARRANTY ...............................................................................................................GC-4 15.LOT PLANS.................................................................................................................GC-4 16.EXISTING ASSESSMENTS.......................................................................................GC-4 17.HOOK-UP CHARGES.................................................................................................GC-4 18.PUBLIC STREET LIGHTING.....................................................................................GC-4 19.SIGNAGE.....................................................................................................................GC-5 20.HOUSE PADS..............................................................................................................GC-5 21.RESPONSIBILITY FOR COSTS................................................................................GC-5 22.DEVELOPER'S DEFAULT.........................................................................................GC-6 22.MISCELLANEOUS A.Construction Trailers ........................................................................................GC-6 B.Postal Service....................................................................................................GC-7 C.Third Parties......................................................................................................GC-7 D.Breach of Contract............................................................................................GC-7 E.Severability.......................................................................................................GC-7 351 ii F.Building Permits...............................................................................................GC-7 G.Waivers/Amendments.......................................................................................GC-7 H.Release..............................................................................................................GC-7 I.Insurance...........................................................................................................GC-7 J.Remedies...........................................................................................................GC-8 K.Assignability.....................................................................................................GC-8 L.Construction Hours...........................................................................................GC-8 M.Noise Amplification..........................................................................................GC-8 N.Access...............................................................................................................GC-8 O.Street Maintenance............................................................................................GC-8 P.Storm Sewer Maintenance................................................................................GC-9 Q.Soil Treatment Systems....................................................................................GC-9 R.Variances...........................................................................................................GC-9 S.Compliance with Laws, Ordinances, and Regulations.....................................GC-9 T.Proof of Title.....................................................................................................GC-9 U.Soil Conditions................................................................................................GC-10 V.Soil Correction................................................................................................GC-10 W.Haul Routes.........................................................................................................GC-10 X.Development Signs..............................................................................................GC-10 Y.Construction Plans...............................................................................................GC-10 Z.As-Built Lot Surveys...........................................................................................GC-11 352 SP-1 CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) PLEASANT VIEW POINTE SPECIAL PROVISIONS AGREEMENT dated May 19, 2025 by and between the CITY OF CHANHASSEN, a Minnesota municipal corporation (the "City"), and, Rachel Development Inc., a Minnesota corporation (the "Developer"). 1.Request for Plat Approval. The Developer has asked the City to approve a plat for a twenty-lot, single-family home subdivision (referred to in this Contract as the "plat"). The land is legally described on the attached Exhibit "A". 2.Conditions of Plat Approval. The City hereby approves the plat on condition that the Developer enter into this Contract, furnish the security required by it, and record the plat with the County Recorder or Registrar of Titles within 120 days after the City Council approves the plat. 3.Development Plans. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract. With the exception of Plan A, the plans may be prepared, subject to City approval, after entering the Contract, but before commencement of any work in the plat. If the plans vary from the written terms of this Contract, the written terms shall control. The plans are: Plan A:Final Plat Plans by Alliant Engineering dated 04-18-2025. 4.Improvements. The Developer shall install and pay for the following: A.Sanitary Sewer System B.Water System C.Storm Water Drainage System D.Streets/ Curb/ Gutter – Peaceful Lane E. Streets/ Curb/ Gutter – Peaceful Lane Reconstruction F.Streets/ Curb/ Gutter – Nez Perce Drive Extension G. Streets/ Curb/ Gutter – Nez Perce Drive Reconstruction H. Grading & Erosion Control I. Mobilization J. Street Lighting K.Site Grading/Restoration L.Underground Utilities (e.g. gas, electric, telephone, CATV) M.Setting of Lot and Block Monuments 353 SP-2 N.Surveying and Staking O.Landscaping P.Erosion Control 5.Time of Performance. The Developer shall install all required improvements by August 19, 2026. The Developer may, however, request an extension of time from the CityEngineer. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 6.Security. To guarantee compliance with the terms of this Contract, payment of special assessments, payment of the costs of all public improvements, and construction of all public improvements, the Developer shall furnish the City with a letter of credit in the form attached hereto, from a bankacceptable to the City, or cash escrow ("security") for $1,387,498.02. The amount of the security was calculated as 110% of the following: Site Grading/Erosion Control/Restoration $192,867.48 Sanitary Sewer $117,144.04 Watermain $130,973.80 Storm Sewer, Drainage System, including cleaning and maintenance $309,631.95 Streets Lighting Mobilization $368,370.73 $10,000.00 $28,224.70 Sub-total, Construction Costs $1,157,212.70 Engineering, surveying, and inspection (7% of construction costs) Landscaping (2% of construction costs) $81,004.89 $23,144.25 Sub-total, Other Costs $104,149.14 TOTAL COST OF PUBLIC IMPROVEMENTS $1,261,361.84 SECURITY AMOUNT (110% of $1,261,361.84 )$1,387,498.02 This breakdownis for historical reference; it is not a restriction on the use of the security. The security shall be subject to the approval of the City. The City may draw down the security, without notice, for any violation of the terms of this Contract. If the required public improvements are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the draw shall be used to cure the default. With City approval, the security may be reduced from time to time as financial obligations are paid, but in no case shall the security be reduced to a point less than 10% of the original amount until (1) all improvements have been completed, (2) iron monuments for lot corners have been installed, (3) all financial obligations to the City satisfied, (4) the required “record” plans have been received by the City, (5) a warranty security is provided, and (6) the public improvements are accepted by the City. 354 SP-3 7.Notice. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail at the following address: Rachel Development Inc. Paul Robinson, Development Director 4180 Napier Court NE St. Michael, MN 55376 (763) 488-9650 probinson@racheldevelopment.com Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or mailed to the City by certified mail in care of the City Manager at the following address: Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, Minnesota 55317, Telephone (952) 227-1100. 8.Other Special Conditions. A. FEES 1.Prior to release of the plat for recording and prior to holding a pre-construction meeting, Developer shall submit to the City $92,400.68 for the following City fees: *Administration fee (based on estimated construction cost of $1,157,212.70, 2.5% for the first 1,000,000 and 1.5% for the remaining $157,212.70)$27,358.19 GIS fee: 20 parcels @ $31/parcel + $103 for the plat $723.00 Park Dedication Fee $5,800 per (1 credit applied for existing house)$110,200.00 Surface Water Management Fee $126,657.15 Subtotal Fees $264,938.34 2.Public improvements outside the plat boundaries will be completed by the Developer. The City will credit the Developer for that work, which is summarized below. Peaceful Lane Reconstruction (Outside of Required Workto Pleasant View Road)$82,504.10 Nez Perce Extension Deferred Assessment Credit $65,000.00 Nez Perce Road Reconstruction (From Plat Boundary to Troendle Circle)$25,033.56 Subtotal Credits $172,537.66 3.Based on Development Fees outlined in (1) above and City Credits outlined in (2) above, the following is a summary of fees, credits, and includes the ultimate fee total required to be paid to the City. Developer Fees $264,938.34 355 SP-4 City Credits $172,537.66 Total Fees Due $92,400.68 B. CONDITIONS OF APPROVAL Planning: 1. Conservation signage shall be required to be placed along the boundary of the stormwater facility south of Pleasant View Road encompassing portions of proposed lots 3, 4, 5, 6, and 7 of Block 1. Signage shall be placed on a post no smaller than 4"x4" with a concrete footing and the location of signage is at the sole discretion of the city. Condition Remains. 2. Applicant shall update corresponding plan sheets including the cover sheet, demolition plan, preliminary plat, grading and drainage plan, grading profiles, erosion and sediment control plan, sanitary sewer and watermain plan, storm sewer plan, wetland management plan, tree preservation plan, tree inventory schedule, and landscaping plan based upon the updated site plan which extends Nez Perce Drive through the proposed development and connects to Peaceful Lane. Condition Met. 3.A public sidewalk may be required along Peaceful Lane and Nez Perce Drive at the sole discretion of the city. The city will assess this improvement with final design plans. Condition no longer applies. Forestry: 1. Developer must update the tree survey to include condition of all significant trees. A significant tree is defined as any healthy tree species measuring 12 inches or more DBH; or any health coniferous tree measuring 12 feet in height or more. Condition Updated. 2. Developer must add tree protection fencing symbols to the legend on the Tree Preservation plan sheet. Condition Remains. 3. Ash trees that are marked to be saved must be inspected by the Environmental Resources Specialist. Condition Remains. 4. Developer shall place the delineated bluff into a conservation easement. This area shall be excluded from the surface water development fee. Condition Added. Engineering: 1. The developer shall enter into Encroachment Agreements for all private improvements located within public drainage and utility easements or right-of-way, as approved by the City Engineer, prior to issuance of building permits. Condition Remains. 2. Any previously recorded easements located within proposed public right-of-way or proposed public drainage and utility easements must be vacated prior to or concurrently with the final plat. Condition Remains. 3. Final plans shall include current City Standard Details, including the 2025 Typical Residential Street Section plate. Standard Details have been uploaded to the City website. Condition Updated. 4. All sheets shall be signed by a licensed engineer. Condition Added. 356 SP-5 5. Dedicate jog with R/W for Block 1 Lot 1, Lot 5, Lot 6, & Lot 7 along Pleasant View Rd to the City. Condition Updated. 6. Coordinate street lighting with the local utility. The Developer shall select “Standard Service”. Condition Added. 7. Lot 1 grading contours do not tie into existing residential lot to the East. Condition Met. 8. Provide D&U Easement over drainage swales where applicable. Condition Met. 9. If there are retaining walls with this project, they shall be HOA or privately owned. Condition Remains. 10. The Developer and their Engineer must amend the construction plans, to fully address construction plan comments and concerns. Final construction plans will be subject to review and approval by staff prior to the recording of the final plat. Condition Remains. 11. The Developer will be required to clean & televise all sanitary sewer at connection point and submit the CCTV footage and reporting to the City Engineer for review prior to paving. Condition Remains. 12. Many typical details were not included in the plans. Engineer to show private services, pipe profiles, pipe sizes, grade of existing driveway tie-in. Condition no longer applies. 13. Address the drainage issue affecting Lot 6 where drainage is trapped in the corner of the plat. Condition Updated. 14. Developer to remove water main and sanitary sewer pipe and structures along Redman Lane R/W that no longer is necessary. Condition Remains. 15. Developer shall coordinate relocations & installations with private utilities prior to final restoration and wear pavement. Condition Updated. 16. Include construction plan sheets for both the connection of Peaceful Lane to Pleasant View Road and the full-depth reclamation of Nez Perce Drive. Extend watermain removal and replacement to Pleasant View watermain. Condition Added. 17. Remove the “Ped Ramp" call out on sheet 7. Condition Added. 18. Extend remove and replacement of existing driveway for 6500 Peaceful Ln. near the right of way. Condition Added. 19. Adjust proposed alignment watermain along Nez Perce Dr. so it does not fall under the curb line. Condition Added. 20. The existing sanitary sewer service for Block 1, Lot 4 shall be televised. Footage shall be submitted to the City Engineer for review prior to making the connection. Condition Added. 21. Connect 6500 Peaceful Ln. sewer and water services to the new mains.Condition Added. 22. Consider adding a hydrant to serve for fire protection for 6500 Peaceful Ln. Condition Added. 23. Relocate the tracer wire access box for Sanitary Manhole No. 5 directly over the new sewer pipe. Condition Added. 24. Sanitary sewer pipe run from MH 4 to MH 3 is under 0.5%. Adjust pipe slope to meet the required minimum 0.5%. Condition Updated. 25. Move miscellaneous storm sewer profiles to a separate sheet to ensure record plan legibility. Condition Added. 26. Provide an additional 5 feet of drainage and utility easement on both sides of the storm sewer pipe from CB 210 to CBMH 209, and from CB 213 to MH 212. Condition Added. 357 SP-6 27. Adjust the rip rap shown at 6500 Peaceful Ln. to not encroach into the property line. Condition Added. 28. On Sheet 19, Notes No. 2. Add a reference to the City standard detail plate. Condition Added. 29. Ensure that the existing CB-3 is located outside of the proposed curb line and not within the driveway for Lot 5. Condition Added. 30. There is existing drain tile within Nez Perce Dr. Connect to existing drain tile with the proposed drain tile. Condition Added. 31. Developer shall apply for and receive all permits required for the improvements. These include and are not limited to MDH Watermain Extension Permit, MPCA Sanitary Sewer Extension Permit, and MCES Sanitary Sewer Permit. Condition Added. 32. Plans currently show connection to an existing CMP pipe on Redman Lane. Replace this pipe as part of the project. Condition Added. 33. Address erosion concerns at proposed FES 100. Consider extending the FES to the pond and coordinate any required easement with the City. Condition Added. 34. Pad layouts do not appear to include 6” of topsoil over entire site. Include comment on all hold down details to call out 6’ of topsoil. Condition Added. 35. Plans can reduce watermain size from the Nez Perce Dr intersection to the cul-de-sac down to 6” PVC C900 if desired. Condition Added. 36. Move proposed streetlight to lot line 4 & 5 at cul-de-sac and verify mailboxes are not installed within the cul-de-sac. Condition Added. 37. EXCB 3 shall remain a catch basin in the curb line. Adjust proposed driveway outside of the impact of the catch basin. Condition Added. 38. Review the sight triangle at Nez Perce Drive and Peaceful Lane to ensure proposed trees do not obstruct driver visibility. Condition Added. 39. Developer shall straighten alignment between STA 3+00 & 4+00 on Peaceful Ln. Include a curve and line table for review. Condition Added. Water Resources: 1. The developer shall enter into a development contract with the City and provide necessary financial security to guarantee compliance with the terms of subdivision approval and construction of infrastructure onsite. (Condition still applies) 2. It is the developer’s responsibility to ensure that permits are received from all other agencies with jurisdiction over the project (i.e. Carver County, MCWD, Board of Water and Soil Resources, MnDOT, etc.) prior to the commencement of construction activities. (Condition still applies) 3. The developer and their Engineer shall work with City staff in amending the construction plans, dated April 18, 2025 prepared by Alliant Engineering, Inc., to fully satisfy construction plan comments and concerns. Final construction plans will be subject to review and approval by staff prior to recording final plat. (Condition modified for clarity) 4. An analysis of stormwater treatment shall be updated and submitted with the final plans that verifies that the design meets the existing and future needs of the City. The treatment volume shall be noted and broken down into what is provided for the existing condition, proposed subdivision, and future roadway projects. The analysis must be approved by the 358 SP-7 watershed district and memorialized prior to recording the final plat.(Condition modified for clarity) 5. The applicant shall secure a wetland alteration permit and associated joint permit sequencing application prior to or in conjunction with the final plat approval. (Condition satisfied) 6. An Operations and Maintenance plan for all proposed BMPs including the inspection frequency, maintenance schedule, and responsible party shall be submitted with the final plans and recorded concurrently with the final plat.(Condition modified for clarity) 7. The applicant shall work with staff to optimize the drainage design and verify that stormwater runoff to the south meets stormwater management standards. (Condition modified for clarity). 8. The applicant shall revise the design and provide a memo which verifies that the development will not adversely impact the drainage of adjacent properties. (Condition no longer applies) 9. The applicant shall provide updated H&H and water quality modelling with the final plans submittal. (Condition modified for clarity) 10. The applicant shall secure condition approval from the watershed district prior to submitting the final plat application to the City. Verification of conditional approval shall be provided with the final plat application.(Condition no longer applies) Building: 1. Building plans must provide sufficient information to verify that proposed building meets all requirements of the Minnesota State Building Code, additional comments or requirements may be required after plan review. Condition Remains. 2. Building permits must be obtained before beginning any demolition or construction. Condition Remains. 3. Private retaining walls, if present, more than four feet high, measured from the bottom of the footing to the top of the wall, must be designed by a professional engineer and a building permit must be obtained prior to construction. Retaining walls, if present, under four feet in height require a zoning permit. Condition Remains. 4. A building permit must be obtained prior to demolishing any structures on the site. Condition Remains. 5. A final grading plan and soils report must be submitted to the Inspections Division before building permits will be issued. Condition Remains. 9. General Conditions. The general conditions of this Contractare attached as Exhibit "B" and incorporated herein. 359 SP-8 CITY OF CHANHASSEN BY: Elise Ryan, Mayor (SEAL) AND: Laurie Hokkanen, City Manager STATE OF MINNESOTA) (ss. COUNTY OF CARVER ) The foregoing instrument was acknowledged before me this day of , 20__, by Elise Ryan, Mayor, and by Laurie Hokkanen, City Manager, of the City of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. NOTARY PUBLIC 360 SP-9 RACHEL DEVELOPMENT INC. BY: Paul Robinson, Development Director STATE OF MINNESOTA ) ( ss. COUNTY OF ) The foregoing instrument was acknowledged before me this day of , 20__, by Paul Robinson, Rachel Development Inc., a Minnesota corporation, on behalf of the company. NOTARY PUBLIC DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952) 227-1100 361 EXHIBIT "A" TO DEVELOPMENT CONTRACT PID #258710190 (955 Pleasant View Road) All of Lot 1 and that part of Lot 2, Block 3, "Vineland Forest", Carver County, Minnesota, lying Northerly of a line drawn from a point on the East line of said Lot 2 a distance of 53.53 feet North of the Southeast corner of said Lot 2 to a point on the West line of said Lot 2 distant 66.00 feet North of the Southwest corner of said Lot 2 and there terminating. PID # 258700060 (6535 Peaceful Lane) That part of Lots 5 and 6, “Vineland”, described as follows: Commencing at the southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the south line of said Lot 5, a distance of 168.62 feet to the actual point of beginning of the tract of land to be herein described; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East 129.57 feet; thence South 89 degrees 16 minutes 34 seconds East 160.63 feet; thence North 0 degrees 43 minutes 26 seconds East 96.01 feet to the actual point of beginning, Carver County, Minnesota. Together with an easement for ingress and egress over and across that part of Lot 5, “Vineland”, Carver County, Minnesota lying Westerly of the following described line: Commencing at the southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the south line of said Lot 5 a distance of 168.62 feet; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East a distance of 32.57 feet, more or less, to a point on the south line of said Lot 5, which point is the point of beginning of the line to be described; thence on a line running North 7 degrees 25 minutes 34 seconds West a distance of 160 feet, more or less, to the intersection of said line with the westerly lot line of said Lot 5, and there terminating. And That part of Lots 5 and 6, "Vineland", Carver County, Minnesota, described as follows: viz: That part of the South 45.25 feet of Lot 5 and of the North 96.01 feet of Lot 6, "Vineland" lying Easterly of a line drawn perpendicular to the South line of said Lot 5 from a point on said South line distant 168.62 feet Westerly along said South line from the Southeast corner of said Lot 5. PID # 258700063 (No Address Assigned) Lot 5, Vineland, Carver County, Minnesota, except that part thereof described as follows, viz: Commencing on the Southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the South line of said Lot 5 a distance of 168.62 feet to the actual point of beginning of the parcel being described; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East a distance of 32.57 feet, more or less, to a point on the South line of said Lot 5 (hereinafter referred to as “Point A”); thence Easterly along the South line of said Lot 5 to the point of beginning. Subject to an easement for ingress and egress and utility purposes, appurtenant to and for the benefit of the above described Exception, which said easement is described as all that part of said Lot 5, Vineland, lying Westerly of the following described line: Beginning on the South line of said Lot 5 described above as “Point A”; thence on a line running North 7 degrees 25 minutes 34 seconds West a distance of 160 feet more or less, to its intersection with the Westerly line of said Lot 5 and there terminating. Also excepting from said Lot 5 that part thereof described as follows, viz: A 50.00 foot strip of land over and across Lot 5, Vineland, Carver County, Minnesota, the centerline of said strip is described as follows: Commencing at the Northeast corner of Lot 5; thence South 00 degrees 24 minutes 03 seconds East, on an assumed bearing, along the East line of Lot 5, a distance of 380.86 feet to the point of beginning of the centerline 362 to be described; thence Westerly, a distance of 29.21 feet along a non-tangential curve concave to the South, said curve having a radius of 198.13 feet, a central angle of 08 degrees 26 minutes 53 seconds and a chord bearing of North 71 degrees 56 minutes 25 seconds West; thence North 76 degrees 09 minutes 51 seconds West tangent to last described curve, a distance of 170.81 feet; thence Northwesterly, a distance of 124.92 feet, along a tangential curve concave to the Northeast, said curve having a central angle of 39 degrees 52 minutes 43 seconds and a radius of 179.48 feet to a point hereinafter referred to as “Point B”; thence continue Northwesterly and Northerly along the last described curve a distance of 124.92 feet and said centerline there terminating. Also excepting, a 50.00 foot strip of land over and across said Lot 5, Vineland, the centerline of said strip is described as follows: Beginning at the above described “Point B”; thence South 53 degrees 42 minutes 49 seconds West, a distance of 100.00 feet and said centerline there terminating. PID #258700062 (No Address Assigned) Lot 6, Vineland, Carver County, Minnesota, except that part thereof described as follows, viz: Commencing at the Northeast corner of said Lot 6, thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the North line of said Lot 6, a distance of 168.62 feet to the actual point of beginning of the land to be described; thence South 0 degrees 43 minutes 26 seconds West a distance of 96.01 feet; thence North 89 degrees 16 minutes 34 seconds West a distance of 160.63 feet; thence North 7 degrees 25 minutes 34 seconds West a distance of 97.00 feet to the North line of said Lot 6; thence Easterly along the said North line of Lot 6 to the point of beginning. Excepting from said Lot 5 and said Lot 6 the following described premises: That part of the South 45.25 feet of Lot 5 and of the North 96.01 feet of Lot 6, “Vineland” lying Easterly of a line drawn perpendicular to the South line of said Lot 5 from a point on said South line distance 168.62 feet Westerly along said South line from the Southeast corner of said Lot 5. And Lot 7, Vineland, Carver County, Minnesota, except that part of said Lot 7 described as follows, viz: Commencing at the Southwest corner of Lot 7, Vineland; thence North 1 degree 53 minutes 49 seconds East a distance of 76.37 feet to a point on the Southeasterly line of Peaceful Lane; thence North 36 degrees 53 minutes 34 seconds East along said Southeasterly line of Peaceful Lane a distance of 174.79 feet; thence South 87 degrees 50 minutes 55 seconds East a distance of 294.35 feet; thence South 1 degree 03 minutes 23 seconds West a distance of 220.04 feet to the Southerly line of said Lot 7; thence South 87 degrees 50 minutes 55 seconds West along said Southerly line of Lot 7 a distance of 397.82 feet to the point of beginning. Together with an easement appurtenant to the foregoing Parcels 2, 3 and 4 for ingress and egress over and across that part of Lot 5, Vineland, Carver County, Minnesota lying Westerly of the following described line: Commencing at the Southeast corner of said Lot 5; thence North 89 degrees 16 minutes 34 seconds West, assumed bearing, along the South line of said Lot 5 a distance of 168.62 feet; thence North 0 degrees 43 minutes 26 seconds East 32.25 feet; thence North 89 degrees 16 minutes 34 seconds West 179.00 feet; thence South 7 degrees 25 minutes 34 seconds East a distance of 32.57 feet, more or less, to a point on the South line of said Lot 5, which point is the point of beginning of the line to be described; thence on a line running North 7 degrees 25 minutes 34 seconds West a distance of 160 feet, more or less, to the intersection of said line with the Westerly lot line of said Lot 5, and there terminating. PID #258690130 (1015 Pleasant View Road) Outlot A, Troendle Addition, Carver County, Minnesota. All Abstract Property 363 MORTGAGE HOLDER CONSENT TO DEVELOPMENT CONTRACT , which holds a mortgage on the subject property, the development of which is governed by the foregoing Development Contract, agrees that the Development Contract shall remain in full force and effect even if it forecloses on its mortgage. Dated this day of , 20 . STATE OF MINNESOTA ) ( ss. COUNTY OF ) The foregoing instrument was acknowledged before me this day of , 20___, by . NOTARY PUBLIC DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952) 227-1100 364 FEE OWNER CONSENT TO DEVELOPMENT CONTRACT , fee owners of all or part of the subject property, the development of which is governed by the foregoing Development Contract, affirm and consent to the provisions thereof and agree to be bound by the provisions as the same may apply to that portion of the subject property owned bythem. Dated this day of , 20 . STATE OF MINNESOTA ) ( ss. COUNTY OF ) The foregoing instrument was acknowledged before me this day of , 20___, by . NOTARY PUBLIC DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952) 227-1100 365 [OFFICIAL BANK LETTERHEAD] IRREVOCABLE LETTER OF CREDIT No. ___________________ Date: _________________ TO:City of Chanhassen 7700 Market Boulevard, Box 147 Chanhassen, Minnesota 55317 Dear Sir or Madam: We hereby issue, for the account of (Name of Developer) and in your favor, our Irrevocable Letter of Credit in the amount of $____________, available to you by your draft drawn on sight on the undersigned bank. The draft must: a) Bear the clause, "Drawn under Letter of Credit No. __________, dated ________________, 2______, of (Name of Bank) "; b) Be signed by the Mayor or City Manager of the City of Chanhassen. c) Be presented for payment at (Address of Bank) , on or before 4:00 p.m. on November 15, 2______. This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty- five (45) days prior to the next annual renewal date (which shall be November 15 of each year), the Bank delivers written notice to the Chanhassen City Manager that it intends to modify the terms of, or cancel, this Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed as follows: Chanhassen City Manager, ChanhassenCity Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, MN 55317, and is actually received by the City Manager at least thirty (30) days prior to the renewal date. This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not referred to herein. This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under this Letter of Credit. This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for Documentary Credits, International Chamber of Commerce Publication No. 600. We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored upon presentation. BY: ____________________________________ Its ______________________________ 366 GC-1 CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) EXHIBIT "B" GENERAL CONDITIONS 1.Right to Proceed. Within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, 2) the necessary security and fees have been received by the City, 3) the plat has been recorded with the County Recorder's Officeor Registrar of Title’s Officeof the County where the plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been satisfied and then the Developer may proceed. 2.Phased Development. If the plat is a phase of a multiphased preliminary plat, the City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. Park charges and area charges for sewer and water referred to in this Contract are not being imposed on outlots, if any, in the plat that are designated in an approved preliminary plat for future subdivision into lots and blocks. Such charges will be calculated and imposed when the outlots are final platted into lots and blocks. 3.Preliminary Plat Status. If the plat is a phase of a multi-phased preliminary plat, the preliminary plat approval for all phases not final platted shall lapse and be void unless final platted into lots and blocks, not outlots, within two (2) years after preliminary plat approval. 4.Changes in Official Controls. For two (2) years from the date of this Contract, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law the City may require compliance with any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 5.Improvements. The improvements specified in the Special Provisions of this Contract shall be installed in accordance with City standards, ordinances, and plans and specifications which have been prepared and signed by a competent registered professional engineer furnished to the City and approved by the City Engineer. The Developer shall obtain all necessary permits from the Metropolitan Council Environmental Services and other pertinent agencies before proceeding with construction. The City will, at the Developer's expense, have one or more construction inspectors 367 GC-2 and a soil engineer inspect the work on a full or part-time basis. The Developer shall also provide a qualified inspector to perform site inspections on a daily basis. Inspector qualifications shall be submitted in writing to the City Engineer. The Developer shall instruct its project engineer/inspector to respond to questions from the City Inspector(s) and to make periodic site visits to satisfy that the construction is being performed to an acceptable level of quality in accordance with the engineer's design. The Developer or his engineer shall schedule a preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties concerned, including the City staff, to review the program for the construction work. 6.Iron Monuments. Before the security for the completion of utilities is released, all monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.021. The Developer's surveyor shall submit a written notice to the City certifying that the monuments have been installed. 7. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 8.Site Erosion and SedimentControl. Before the site is rough graded, and before any utility construction is commenced or building permits are issued, the erosion and sediment control plan, Plan B, shall be implemented, inspected, and approved by the City. The City may impose additional erosion and sediment control requirements if they would be beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. Except as otherwise provided in the erosion and sediment control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosionand sediment transport. If the Developer does not comply with the erosion and sediment control plan and schedule of supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion and sediment transport at the Developer's expense. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. No development will be allowed and no building permits will be issued unless the plat is in full compliance with the erosion and sediment control requirements. Erosion and sediment control needs to be maintained until vegetative cover has been restored, even if construction has been completed and accepted. After the site has been stabilized to where, in the opinion of the City, there is no longer a need for erosion and sediment control, the City will authorize the removal of the erosion and sediment control, i.e. hay bales and silt fence. The Developer shall remove and dispose of the erosion and sediment control measures. 8a.Erosion Control During Construction of a Dwelling or Other Building. Before a building permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash escrow or letter of credit per lot shall also be furnished to the City to guarantee compliance with City Code § 7-22. 368 GC-3 9.Clean up. The Developer shall maintain a neat and orderly work site and shall daily clean, on and off site, dirt and debris, including blowables, from streets and the surrounding area that has resulted from construction work by the Developer, its agents or assigns. 10.Acceptance and Ownership of Improvements. Except for streets and utilities identified as private under the terms of this Agreement, all other improvements lying within public easements shall become City property upon completion and acceptance by the City of the work and construction required by this contract. After completion of the improvements, a representative of the contractor, and a representative of the Developer's engineer will make a final inspection of the work with the City Engineer. Before the City accepts the improvements, the City Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved plans and specifications and the Developer and his engineer shall submit a written statement to the City Engineer certifying that the project has been completed in accordance with the approved plans and specifications. The appropriate contractor waivers shall also be provided. Final acceptance of the public improvements shall be by City Council resolution. 11.Claims. In the event that the City receives claims from laborers, materialmen, or others that work required by this Contract has been performed, the sums due them have not been paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees posted with the City, and if the claims are not resolved at least ninety (90) days before the security required by this Contract will expire, the Developer hereby authorizes the City to commence an Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts, to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the District Court, except that the Court shall retain jurisdiction to determine attorneys' fees. 12.Park Dedication. The Developer shall pay full park dedication fees in conjunction with the installation of the plat improvements. The park dedication fees shall be the current amount in force at the time of final platting pursuant to Chanhassen City Ordinances and City Council resolutions. 13.Landscaping. Landscaping shall be installed in accordance with Plan D. Unless otherwise approved by the City, trees not listed in the City’s approved tree list are prohibited. The minimum tree size shall be two and one-half (2½) inches caliper, either bare root in season, or balled and burlapped. The trees may not be planted in the boulevard (area between curb and property line). In addition to any sod required as a part of the erosion and sediment control plan, Plan B, the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each lot utilizing a minimum of six (6) inches of topsoil as a base. Seed or sod shall also be placed on all disturbed areas of the lot. If these improvements are not in place at the time a certificate of occupancy is requested, a financial guarantee of $750.00 in the form of cash or letter of credit shall be provided to the City. These conditions must then be complied with within two (2) months after the certificate of occupancy issued, except that if the certificate of occupancy is issued between October 1 through May 1 these conditions must be complied with by the following July 1st. Upon expiration of the time period, inspections will be conducted by City staff to verify satisfactory completion of all conditions. City 369 GC-4 staff will conduct inspections of incomplete items with a $50.00 inspection fee deducted from the escrow fund for each inspection. After satisfactory inspection, the financial guarantee shall be returned. If the requirements are not satisfied, the City may use the security to satisfy the requirements. The City may also use the escrowed funds for maintenance of erosion control pursuant to City Code Section 7-22 or to satisfy any other requirements of this Contract or of City ordinances. These requirements supplement, but do not replace, specific landscaping conditions that may have been required by the City Council for project approval. 14.Warranty. The Developer warrants all improvements required to be constructed by it pursuant tothis Contract against poor material and faulty workmanship. The Developer shall submit either 1) a warranty/maintenance bond for 100% of the cost of the improvement, or 2) a letter of credit for twenty-five percent (25%) of the amount of the original cost of the improvements. A.The required warranty period for materials and workmanship for the utility contractor installing public sewer and water mains shall be two (2) years from the date of final written City acceptance of the work. B.The required warranty period for all work relating to street construction, including concrete curb and gutter, sidewalks and trails, materials and equipment shall be subject to two (2) years from the date of final written acceptance. C.The required warranty period for sod, trees, and landscaping is one full growing season following acceptance by the City. 15.Lot Plans. Prior to the issuance of building permits, an acceptable Grading, Drainage, Erosion Control including silt fences, and Tree Removal Plan shall be submitted for each lot for review and approval by the City Engineer. Each plan shall assure that drainage is maintained away from buildings and that tree removal is consistent with development plans and City Ordinance. 16.Existing Assessments. Any existing assessments against the plat will be re-spread against the plat in accordance with City standards. 17.Hook-up Charges. . At the time of final plat approval the Developer shall pay 30% of the City Sewer Hook-up charge and 30% of the City Water hook up charge for each lot in the plat in the amount specified in Special Provision, Paragraph 8, of this Development Contract. The balance of the hook-up charges is collected at the time building permits are issued are based on 70% of the rates then in effect, unless a written request is made to assess the costs over a four year term at the rates in effect at time of application. 18.Public Street Lighting. The Developer shall have installed and pay for public street lights in accordance with City standards. The public street lights shall be accepted for City ownership and maintenance at the same time that the public street is accepted for ownership and maintenance. A plan shall be submitted for the City Engineer's approval prior to the installation. Before the City signs the final plat, the Developer shall pay the City a fee of $300.00 for each street light installed in the plat. The fee shall be used by the City for furnishing electricity and maintaining each public street 370 GC-5 light for twenty (20) months. The Developer shall select Standard Service for the agreement with the Utility. 19.Signage. All street signs,traffic signs, and wetland monumentation required by the City as a part of the plat shall be furnished and installed by the City at the sole expense of the Developer. 20.House Pads. The Developer shall promptly furnish the City "as-built" plans indicating the amount, type and limits of fill on any house pad location. 21.Responsibility for Costs. A. The Developer shall pay an administrative fee in conjunction with the installation of the plat improvements. This fee is to cover the cost of City Staff time and overhead for items such as review of construction documents, preparation of the Development Contract, monitoring construction progress, processing pay requests, processing security reductions, and final acceptance of improvements. This fee does not cover the City's cost for construction inspections. The fee shall be calculated as follows: i) if the cost of the construction of public improvements is less than $500,000, three percent (3%) of construction costs; ii)if the cost of the construction of public improvements is between $500,000 and $1,000,000, three percent (3%) of construction costs for the first $500,000 and two percent (2%) of construction costs over $500,000; iii)if the cost of the construction of public improvements is over $1,000,000, two and one-half percent (2½%) of construction costs for the first $1,000,000 and one and one-half percent (1½%) of construction costs over $1,000,000. Before the City signs the final plat, the Developer shall deposit with the City a fee based upon construction estimates. After construction is completed, the final fee shall be determined based upon actual construction costs. The cost of public improvements is defined in paragraph 6 of the Special Provisions. B. In addition to the administrative fee, the Developer shall reimburse the City for all costs incurred by the City for providing construction and erosion and sediment control inspections. This cost will be periodically billed directly to the Developer based on the actual progress of the construction. Payment shall be due in accordance with Article 21E of this Agreement. C. The Developer shall hold the City and its officers and employees harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers and employees for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. 371 GC-6 D. In addition to the administrative fee, the Developer shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt all plat development work and construction, including but not limited to the issuance of building permits for lots which the Developer may or may not have sold, until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of 8% per year. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as, but not limited to, sewer availability charges ("SAC"), City water connection charges, City sewer connection charges, and building permit fees. G. Private Utilities. The Developer shall have installed and pay for the installation of electrical, natural gas, telephone, and cable television service in conjunction with the overall development improvements. These services shall be provided in accordance with each of the respective franchise agreements held with the City. H.The developer shall pay the City a fee established by City Council resolution, to reimburse the City for the cost of updating the City’s base maps, GIS data base files, and converting the plat and record drawings into an electronic format. Record drawings must be submitted within four months of final acceptance of public utilities. All digital information submitted to the City shall be in the Carver County Coordinate system. 22.Developer's Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in default, not less than four (4) days in advance. This Contract is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 23.Public Improvements Beyond Plat Boundaries. The Developer will be reconstructing portions of Peaceful Lane and Nez Perce Drive, which are outside the boundaries of the Pleasant View Pointe Plat, for the benefit of the public and which are beyond the extent to which those roads would have been constructed as a result of the realignment of public right-of-way as requested by the Developer. As a result, the cost of those public improvements outside the plat boundaries has been credited against applicable development fees in Section 8.A.2. 24.Miscellaneous. A. Construction Trailers. Placement of on-site construction trailers and temporary job site offices shall be approved by the City Engineer as a part of the pre-construction meeting for installation of public improvements. Trailers shall be removed from the subject property within thirty 372 GC-7 (30) days following the acceptance of the public improvements unless otherwise approved by the City Engineer. B. Postal Service. The Developer shall provide for the maintenance of postal service in accordance with the local Postmaster's request. C. Third Parties. Third parties shall have no recourse against the City under this Contract. The City is not a guarantor of the Developer’s obligations under this Contract. The City shall have no responsibility or liability to lot purchasers or others for the City’s failure to enforce this Contract or for allowing deviations from it. D. Breach of Contract. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. The City may also issue a stop work order halting all plat development until the breach has been cured and the City has received satisfactory assurance that the breach will not reoccur. E. Severability. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. F. Building Permits. Building permits will not be issued in the plat until sanitary sewer, watermain, and storm sewer have been installed, tested, and accepted by the City, and the streets needed for access have been paved with a bituminous surface and the site graded and revegetated in accordance with Plan B of the development plans. G. Waivers/Amendments. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. Release. This Contract shall run with the land and may be recorded against the title to the property . After the Developer has completed the work required of it under this Contract, at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the issuance of such a certificate, individual lot owners may make as written request for a certificate applicable to an individual lot allowing a minimum of ten (10) days for processing. I. Insurance. Developer shall take out and maintain until six (6) months after the City has accepted the public improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $500,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy, and the Developer shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10) 373 GC-8 days advance written notice of the cancellation of the insurance. The certificate may not contain any disclaimer for failure to give the required notice. J.Remedies. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, expressed or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. K. Assignability. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continuein full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. L. Construction Hours. Construction hours, including pick-up and deliveries of material and equipment and the operation of any internal combustion engine, may only occur from 7:00 a.m. to 6:00 p.m. on weekdays, from 9:00 a.m. to 5:00 p.m. on Saturdays with no such activity allowed on Sundays or on legal holidays. Contractors must require their subcontractors, agents and supplies to comply with these requirements and the Contractor is responsible for their failure to do so. Under emergency conditions, this limitation may be waived by the written consent of the City Engineer. If construction occurs outside of the permitted construction hours, the Contractor shall pay the following administrative penalties: First violation $ 500.00 Second violation $1,000.00 Third & subsequent violations All site development and construction must cease for seven (7) calendar days M. Noise Amplification. The use of outdoor loudspeakers, bullhorns, intercoms, and similar devices is prohibited in conjunction with the construction of homes, buildings, and the improvements required under this contract. The administrative penalty for violation of construction hours shall also apply to violation of the provisions in this paragraph. N. Access. All access to the plat prior to the City accepting the roadway improvements shall be the responsibility of the Developer regardless if the City has issued building permits or occupancy permits for lots within the plat. O. Street Maintenance. The Developer shall be responsible for all street maintenance until streets within the plat are accepted by the City. Warning signs shall be placed by the Developer when hazards develop in streets to prevent the public from traveling on same and directing attention to detours. If streets become impassable, the City may order that such streets shall be barricaded and closed. The Developer shall maintain a smooth roadway surface and provide proper surface drainage. The Developer may request, in writing, that the City plow snow on the streets prior to final acceptance of the streets. The City shall have complete discretion to approve or reject the request. The City shall not be responsible for reshaping or damage to the street base or utilities because of snow plowing 374 GC-9 operations. The provision of City snow plowing service does not constitute final acceptance of the streets by the City. P. Storm Sewer Maintenance. The Developer shall be responsible for cleaning and maintenance of the storm sewer system (including ponds, pipes, catch basins, culverts and swales) within the plat and the adjacent off-site storm sewer system that receives storm water from the plat. The Developer shall follow all instructions it receives from the City concerning the cleaning and maintenance of the storm sewer system. The Developer's obligations under this paragraph shall end two (2) years after the public street and storm drainage improvements in the plat have been accepted by the City. Twenty percent (20%) of the storm sewer costs, shown under section 6 of the special provisions of this contract, will be held by the City for the duration of the 2-year maintenance period. Q. Soil Treatment Systems. If soil treatment systems are required, the Developer shall clearly identify in the field and protect from alteration, unless suitable alternative sites are first provided, the two soil treatment sites identified during the platting process for each lot. This shall be done prior to the issuance of a Grading Permit. Any violation/disturbance of these sites shall render them as unacceptable and replacement sites will need to be located for each violated site in order to obtain a building permit. R. Variances. By approving the plat, the Developer represents that all lots in the plat are buildable without the need for variances from the City's ordinances. S. Compliance with Laws, Ordinances, and Regulations. In the development of the plat the Developer shall comply with all laws, ordinances, and regulations of the following authorities: 1. City of Chanhassen; 2. State of Minnesota, its agencies, departments and commissions; 3. United States Army Corps of Engineers; 4. Watershed District(s); 5. Metropolitan Government, its agencies, departments and commissions. T. Proof of Title. Upon request, the Developer shall furnish the City with evidence satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to enter into this Development Contract. U. Soil Conditions. The Developer acknowledges that the City makes no representations or warranties as to the condition of the soils on the property or its fitness for construction of the improvements or any other purpose for which the Developer may make use of such property. The Developer further agrees that it will indemnify, defend, and hold harmless the City, its governing body members, officers, and employees from any claims or actions arising out of the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or pollutants were caused to be there by the City. V. Soil Correction. The Developer shall be responsible for soil correction work on the property. The City makes no representation to the Developer concerning the nature of suitability 375 GC-10 of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots which have no fill material a soils report from a qualified soils engineer is not required unless the City's building inspection department determines from observation that there may be a soils problem. On lots with fill material that have been mass graded as part of a multi-lot grading project, a satisfactory soils report from a qualified soils engineer shall be provided before the City issues a building permit for the lot. On lots with fill material that have been custom graded, a satisfactory soils report from a qualified soils engineer shall be provided before the City inspects the foundation for a building on the lot. W. Haul Routes. The Developer, the Developer’s contractors or subcontractors must submit proposed haul routes for the import or export of soil, construction material, construction equipment or construction debris, or any other purpose. All haul routes must be approved by the City Engineer X. Development Signs. The Developer shall post a six foot by eight foot development sign in accordance with City Detail Plate No. 5313 at each entrance to the project. The sign shall be in place before construction of the required improvements commences and shall be removed when the required improvements are completed, except for the final lift of asphalt on streets. The signs shall contain the following information: project name, name of developer, developer’s telephone number and designated contact person, allowed construction hours. Y. Construction Plans. Upon final plat approval, the developer shall provide the City with two complete sets of full-size construction plans and four sets of 11”x17” reduced construction plan sets and three sets of specifications. Within four months after the completion of the utility improvements and base course pavement and before the security is released, the Developer shall supply the City with the following: (1) a complete set of reproducible Mylar as-built plans, (2) twocomplete full-size setsof blue line/paper as-built plans, (3) two complete sets of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) location stationing and swing ties of all utility stubs including draintile cleanouts, (6) bench mark network, (7) digital file of as-built plans in both .dxf & .tif format (the .dxf file must be tied to the current county coordinate system), (8) digital file of utility tie sheets in either .doc or .tif format, and (9) a breakdown of lineal footage of all utilities installed, including the per lineal foot bid price. The Developer is required to submit the final plat in electronic format. Z. As-Built Lot Surveys. An as-built lot survey will be required on all lots prior to the Certificate of Occupancy being issued. The as-built lot survey must be prepared, signed, and dated by a Registered Land Surveyor. Sod and the bituminous driveways must be installed before the as-built survey is completed. If the weather conditions at the time of the as-built are not conducive to paving the driveway and/or installing sod, a temporary Certificate of Occupancy may be issuedand the as-built escrow withheld until all work is complete. Rev. 9/30/2021 376