Approval Letter 6.24.25Page | 1 June 24, 2025 Inland Development Partners 100 Lake Street W Suite 200 Wayzata, MN 55391 Attn: Tom Shaver Attn: Jacquel Hajder Level 7 Development LLC 4600 Kings Point Road Minnetrista, MN 55331 Attn: Mark Nordland Civil Site Group 5000 Glenwood Avenue Golden Valley, MN 55422 Attn: Matt Pavek Re: Planning Case #2025-08 – Preliminary Plat and Site Plan Review for Avienda Apartments. To whom it may concern, This letter is to confirm that on June 23rd, 2025, the Chanhassen City Council approved your requested preliminary plat and site plan review subject to the following conditions: Planning: 1. Developer shall provide sidewalk in the following locations: alongside the east property line from the north property line to the south property line, the west side of the driveway entrance on the south-east end of the property to connect to the south-east corner of the building, and the South end of the building connecting the proposed to the path on the west side of the building. Condition updated and met. 2. Private sidewalks along the exterior of the proposed building shall be encumbered with a public access easement. 3. All lighting shall have a total cutoff angle equal to or less than 90 degrees. 4. Developer shall add four benches, each measuring at least 48” in width, along the meandering path around the exterior of the proposed building. Developer to propose location of those benches for city approval. 5. Developer shall provide a documented parking demand summary on a similar unit count multi-family project for the proof of parking. Condition met. Page | 2 6. Developer shall provide measurements of what materials in the courtyard count towards the hard cover calculations on the submitted plans. 7. Developer shall incorporate natural stone on all public-facing exterior elevations of the proposed building per the Avienda Design Guidelines recommended class I materials. Condition no longer required due to City Council’s review of the proposed architecture. 8. The Development Agreement shall include that the Developer unconditionally guarantees to the City that it shall construct additional parking spaces upon the Subject Property in accordance with the zoning ordinance and the future Development Agreement if the parking demand for the Subject Property exceeds the actual on-site parking supply. Forestry: 1. Planting plan shall adhere to the city ordinance for species diversity as outlined in city code section 20-1183. Tree Diversity. No more than ten percent of the trees may be from any one tree species, no more than 20 percent of the trees may be from any one genus, and no more than 30 percent of trees from any one family. Engineering: 1. The developer shall enter into Encroachment Agreements for private improvements (e.g., retaining walls and monument signage) located within the 10-foot-wide public drainage and utility corridor abutting Avienda Parkway right-of-way prior to issuance of building permits. 2. Any previously recorded easements located within proposed public right-of-way or proposed public drainage and utility easements must be vacated prior to or concurrently with the final plat. 3. The applicant and their Engineer shall work with city staff in amending the construction plans, dated April 4th, 2025 prepared by Matthew Pavek, PE with Civil Site Group, to fully satisfy construction plan comments and concerns. Final construction plans will be subject to review and approval by staff prior to recording of the final plat. 4. All newly constructed streets and sidewalks will be privately owned and maintained. The developer shall provide for review and approval maintenance agreements for these improvements, as well as cross-access/parking agreements for the shared parking, prior to or concurrently with the recording of the final plat. 5. Construction design elements associated with the street plans such as stationing, curb tables and alignments, centerline grades, and intersection details will be required prior to final plat approval. 6. All sanitary sewer and water mains will be publicly owned and maintained after acceptance of the public improvements by the City Council. These utilities shall be covered by a Drainage and Utility Easement which shall be large enough for the owner to own and maintain. 7. The applicant will be required to enter into a Development Contract with the City and all applicable securities and fees provided prior to recording of the final plat. 8. It is the applicant’s responsibility to ensure that permits are received from all other agencies with jurisdiction over the project (i.e. Army Corps of Engineers, DNR, MnDOT, Carver County, RPBC Watershed District, Board of Water and Soil Resources, PCA, MDH, MPCA, etc.). Page | 3 9. The developer shall incorporate the latest City Detail Plates and Specifications into the Final Plat application. 10. At all locations where the proposed trail and sidewalk connect to existing pedestrian facilities, verify that the existing conditions meet current ADA standards. 11. Provide pedestrian ramps at all sidewalk and trail street crossings in accordance with ADA and City standards. 12. Sidewalks must be a minimum of 5 feet wide, and City trails must be a minimum of 8 feet wide. 13. Provide a schedule for all “Work By Others.” These improvements must be completed prior to the issuance of building permits, as the associated utilities are integral to the Avienda Apartments project. 14. Several surface grading issues are noted where proposed contours do not tie into existing grades. Please review and revise accordingly. 15. Per typical City design standards, sanitary sewer should be located in the center of the roadway, with watermain offset by 10 feet from the sanitary sewer. 16. City Standard Detail Plates shall be included in the construction plan set and displayed in a layout format of 2 rows by 4 columns for consistency with City expectations. Water Resources: 1. The developer shall enter into a development contract with the City and provide necessary financial security to guarantee compliance with the terms of subdivision approval and construction of infrastructure onsite. The Development contract shall be recorded concurrently with the final plat. 2. It is the developer’s responsibility to ensure that permits are received from all other agencies with jurisdiction over the project (i.e. Carver County, RPBCWD, Board of Water and Soil Resources, MnDOT, etc.) prior to the commencement of construction activities. 3. The applicant shall provide an updated survey to verify the current conditions of the site as part of the final plat application. 4. The applicant shall provide an updated set of master stormwater plans to verify the design of the Avienda Apartment site works with the overall stormwater build out. The updated plans shall be submitted as part of the final plat application. 5. The developer and their Engineer shall work with City staff in amending the construction plans, dated April 18, 2025 prepared by Civil Site Group, to fully satisfy construction plan comments and concerns. Final construction plans will be subject to review and approval by staff prior to recording final plat. 6. An analysis of stormwater treatment shall be submitted with the final plat application that verifies that the design meets the temporary and proposed conditions for the site for both the rate control basin and the stormwater reuse basin. The water quality approved for the site by the Watershed shall be constructed with the development or confirmed that it has been installed by the Master Plan, or a temporary condition shall be installed to meet the requirements. 7. An Operations and Maintenance plan for all proposed private BMPs including the inspection frequency, maintenance schedule, and responsible party shall be submitted with the final plat application. Page | 4 8. The applicant shall revise the design to reflect storm sewer sizing and outletting to the basin located in the alternate exhibit. 9. The applicant shall provide updated H&H and water quality modelling with the final plat submittal. 10. The overall site has an approved permit by the watershed district that conditions individual sites obtain their own permits. The applicant shall secure conditional approval from the watershed district prior to submitting the final plat application to the City. Verification of conditional approval shall be provided with the final plat application. 11. The applicant shall design the site to meet the conditions outlined in the master stormwater plan that was approved by the Watershed District. There is no analysis on the time between removing the temporary basin on site and installing the underground rate control basin. If the applicant determines a temporary condition must be used, an analysis of the temporary condition must be submitted or an analysis on the temporary affect on the site before the underground basin is installed. Building: 1. The developer must submit a list of proposed street names for review and approval prior to final plat of the property. 2. A building permit must be obtained before beginning any construction. 3. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 4. Building plans must provide sufficient information to verify that proposed building meets all requirements of the Minnesota State Building Code, additional comments or requirements may be required after plan review 5. The building is required to have automatic fire extinguishing systems. 6. Structure proximity to property lines (and other buildings) will have an impact on the code requirements for the proposed buildings, including but not limited to; allowable size, protected openings and fire-resistive construction. These requirements will be addressed when complete building and site plans are submitted. 7. Building plans must include a code analysis that contains the following information: Key Plan, Occupancy group, Type of construction, Allowable height and area, Fire sprinklers, Separated or non-separated, Fire resistive elements (Ext walls, Bearing walls - exterior or interior, Shaft, Incidental use), Occupant load, Exits required (Common path, Travel distance), Minimum plumbing fixture count 8. Retaining walls (if present) more than four feet high, measured from the bottom of the footing to the top of the wall, must be designed by a professional engineer and a building permit must be obtained prior to construction. Retaining walls (if present) under four feet in height require a zoning permit. 9. Accessibility will have to be provided to all portions of the development and a percentage of the units may also be required to be accessible or adaptable in accordance with Minnesota State Building Code Chapter 1341. Further information is needed to determine these requirements. 10. A final grading plan and soils report must be submitted to the Inspections Division before building permits will be issued. Page | 5 Fire: 1. Based on lack of rear property line access to install a proper fire access road, the balconies must be sprinkled, unless the balcony structures remain under the required size by fire code and non-combustible materials for balconies and siding is used. Due to lack of courtyard access, stand pipe connections shall be provided near the pool deck for faster hose advancement capability. 2. The north fire apparatus turn around does not meet code, needs to be widened to 70 feet. The measurement needs to be north to south, not east to west. 3. Confirming that the fire apparatus turning study was done with our fire truck dimensions – Ladder Truck? If not, will need to redo the fire apparatus turn around study with our truck dimensions. 4. Due to lack of fire access road on west side and access to pool deck, we will require further placement of fire stand pipes in and around the pool area and rear of building. Will work with fire sprinkler designer for install. 5. FDC location is acceptable but should be aware that in order to hook to this location, hoses will most likely damage vehicles if parked in front. Usually, a property will stripe the parking spots in front of the access for an FDC if it is too close to vehicles. 6. First responder radio coverage study required. At some point during construction, testing is required to be completed by a licensed contractor to provide for a first responder radio signal repeater system. Required by MN Fire Code. 7. EC Charging stations – all EV charging stations in underground garages will be required to be placed as close to the garage doors as possible for removal in case of a fire. If you have any questions or need additional information, please contact me by email at rarsenault@chanhassenmn.gov Sincerely, Rachel Arsenault Associate Planner