Chanhassen_Minnewashta PP Slide Deck- UpdatedMinnewashta Apartments CHANHASSEN PLANNING COMMISSION August 12, 2025 Minnewashta Apartments– Location & Zoning •ADDRESS: 621 Santa Vera Drive •PRESENT ZONING: RSF •FUTURE LAND USE: Medium Density Residential •SITE ACREAGE: 5.51 Acres Gross •PROPOSED DENSITY: 8 Units/Acre •The Existing Zoning Designation is not compliant with the Comprehensive Plan. •Our request is consistent and compliant with the Future Land Plan of the 2040 Comprehensive Plan. Site Constraints & Goals •Sanitary Sewer Depth/ Service Area •Existing Grades •Access Coordination •Existing Tree Preservation •City of Chanhassen Easement Minnewashta Site Plan •44 Total Units •Parking = 88 (2 Stalls per unit) •Site Impervious Coverage = 19.3% (allowed 50% under code) •Modified Access at Highway 41 to Allow for future Roundabout (2028) Neighborhood Context & Buffering Cross Section Minnewashta Site Plan – Future •Improved RAB tie in, moving Trouvaille access further west. •Planned Treatment of off-site stormwater •Project includes the construction of 1 leg of the RAB. Minnewashta Apartments– Traffic Discussion THE TRAFFIC SITUATION AT THIS LOCATION IS COMPLEX, WITH MANY VARIABLES. THERE ARE TWO CONDITIONS WHICH WE ARE ATTEMPTING TO SOLVE FOR. INTERIM CONDITION: BETWEEN BUILDING CONSTRUCTION AND THE RAB COMPLETION IN 2028. ULTIMATE CONDITION: AFTER RAB IS COMPLETED. Construction Activity 10/25 11/25 12/25 1/26 2/26 3/26 4/26 5/26 6/26 7/26 8/26 9/26 10/26 11/26 12/26 1/27 2/27 3/27 4/27 5/27 6/27 7/27 8/27 9/27 10/27 11/27 12/27 1/28 2/28 3/28 4/28 5/28 6/28 7/28 8/28 9/28 Minnewashta Apartments Construction Minnewashta Apartments Lease Up School In Session ///////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// Phase 1 Detour - Hwy 5 Phase 2 Detour - Hwy 5 RAB Construction ////////////////////////////////////////////////////////////////////////////////////////////////////////////////// Highway 5 Open Minnewashta Apartments– Construction Phasing Key Timeline Details •Goal to complete construction prior to RAB Construction to avoid damaging infrastructure. •New residents would not be moved in during the period of greatest impact from Highway 5 Detour. •We anticipate Highway 5 to be open by the time the building is fully leased. •We are working with the City and MnDOT to determine the feasibility of a temporary signal. •When Completed and Occupied, the project is projected to generate: •Up to 298 Daily Trips •18 Peak Hour Morning Trips •22 Peak Hour Afternoon Trips •This amounts to one vehicle every 3 minutes at the peak hours. •Peak times do not coincide with drop off/ pick up times for Middle School. •The RAB can handle the anticipated trip volumes. Minnewashta Apartments– Traffic Minnewashta Apartments– Architectural Design •Three Story Building consisting of One-, Two-, and Three-Bedroom Units •Four-sided architecture with subsurface resident parking •Skydeck, Gym, Meeting Rooms, etc. •High Quality Materials •Height of building is 5.5’ taller than Trouvaille, but is set back further from the road.