Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
08-12-2025 PC Agenda and Packet
A.6:00 P.M. - CALL TO ORDER B.PUBLIC HEARINGS B.1 Santa Vera Phase II Planned Unit Development Amendment and Site Plan Review (Planning Case 25-07) B.2 POSTPONED Minnewashta Apartments Rezoning and Site Plan Review (Planning Case 25- 11) C.GENERAL BUSINESS D.APPROVAL OF MINUTES D.1 Approve Planning Commission Meeting Minutes dated June 3, 2025 E.COMMISSION PRESENTATIONS F.ADMINISTRATIVE PRESENTATIONS G.CORRESPONDENCE DISCUSSION H.OPEN DISCUSSION I.ADJOURNMENT AGENDA CHANHASSEN PLANNING COMMISSION TUESDAY, AUGUST 12, 2025 CITY COUNCIL CHAMBERS, 7700 MARKET BOULEVARD NOTE: Planning Commission meetings are scheduled to end by 9:00 p.m. as outlined in the official by-laws. We will make every attempt to complete the hearing for each item on the agenda. If, however, this does not appear to be possible, the Chairperson will notify those present and offer rescheduling options. Items thus pulled from consideration will be listed first on the agenda at the next Commission meeting. If a constituent or resident sends an email to staff or the Planning Commission, it must be made part of the public record based on State Statute. If a constituent or resident sends an email to the Mayor and City Council, it is up to each individual City Council member and Mayor if they want it to be made part of the public record or not. There is no State Statute that 1 forces the Mayor or City Council to share that information with the public or be made part of the public record. Under State Statute, staff cannot remove comments or letters provided as part of the public input process. 2 Planning Commission Item August 12, 2025 Item Santa Vera Phase II Planned Unit Development Amendment and Site Plan Review (Planning Case 25-07) File No.25-07 Item No: B.1 Agenda Section PUBLIC HEARINGS Prepared By Rachel Jeske, Planner Applicant Headwaters Development, LLC Present Zoning Planned Unit Development Residential District (PUDR) Land Use Residential High Density Acerage 3.82 Density 11.95 Units/Acres Applicable Regulations Chapter 20, Article II, Division 6, Site Plan Review Chapter 20, Article VIII, Planned Unit Development Standards Chapter 20, Article XV, Division 1 “R-12” District Chapter 20, Article 20-XXIII, Division 20-XXIII-9 Design Standards for Multifamily Developments Saratoga 3rd Addition PUD Standards SUGGESTED ACTION "The Chanhassen Planning Commission recommends approval of the requested site plan and amendment to the Saratoga 3rd Addition Planned Unit Development Zoning Ordinance for the construction of two apartment buildings at 621 Santa Vera Drive, subject to the conditions of approval and adopts the attached Findings of Fact and Decision.” SUMMARY The Applicant is requesting a site plan review and a planned unit development amendment to construct 3 two apartment buildings consisting of 12-unit and 16-unit buildings, with modifications to the required architecture and parking setbacks. BACKGROUND The Saratoga 3rd Addition Planned Unit Development (PUD) ordinance was originally approved in 1998. This PUD incorporates a property with an existing 18-unit apartment building on it. The PUD ordinance allows for a total of 46 units across the site. Multiple concepts for this site have been brought to City Council work sessions for review, including a recently withdrawn application from the same applicant for a single, 59-unit apartment building. DISCUSSION RECOMMENDATION Staff recommends the approval of the requested site plan and planned unit development amendments. ATTACHMENTS Development Application Narrative Civil Plan Set Traffic Study Architectural Plan Set City Staff Report Redlined PUD Ordinance Findings of Fact Public Comment Santa Vera Affidavit of Mailing Affidavit of Publishing 4 5 6 Santa Vera Apartments Submittal Narrative Proposal Headwaters Development is proposing a redevelopment of the Santa Vera Apartments site (the “Site”) located at 621 Santa Vera Drive, located just north of downtown Chanhassen. The redevelopment will consist of the new construction of 28 townhome-style fiats, which will supplement the existing slab-on-grade 18-unit apartment building currently operating on-site. As part of the project, the existing building will also be renovated to include updated units, a new exterior, and improved landscaping and drainage. Once completed, the total project (the “Project”) will consist of 46 rental apartment homes. Site Location The Site is bordered by Laredo Drive to the east, Saratoga Drive to the north, and Santa Vera Drive to the northwest. Immediate adjacent uses are Chanhassen Elementary School immediately to the south, City Center Park to the west, and predominately single-family residential homes to the north and east. Santa Vera is located less than a ¼ mile from the City of Chanhassen’s Central Business District, and only steps away from employment centers, vital services, grocery stores, retail and entertainment, and a variety of dining options. Zoning and Land Use The Site is approximately 3.85 acres. The present zoning is PUD Residential, and the present land use designation has the property guided Residential High Density, which allows for 8-16 units per acre. The Residential High-Density guidance allows for up to 46 units by right. The Project is ideally located for these additional units given its proximity to employment and services, and the existing infrastructure currently in place is sufficient to handle the increased density. We are not requesting any waivers from the applicable zoning code. Site Design The design of the Site allows for separation from the existing neighborhood single-family homes. The proposed access to the Site would be from both Laredo & Santa Vera Drive. The Project will also adhere to all landscaping requirements, allowing it flt seamlessly into its surroundings and the existing neighborhood. New stormwater ponding will be constructed on the Southeast portion of the site – the natural low spot. This ponding will serve both the new townhome buildings, as well as treat the stormwater from the existing apartment building, which is currently released untreated into the municipal storm system. 7 2 Project Description Once completed the Project will contain forty-six (46) total units across three buildings. Twenty -Eight (28) units will be included in two newly constructed two-story buildings. Each new unit will have its own dedicated garage and direct access entry. The remaining eighteen (18) units currently exist within the two -story slab-on-grade building originally built in 1968. The Project will be constructed as one cohesive development through connectivity, architectural design, and shared amenities. The existing building contains a current unit mix of 8 one-bedroom units and 10 two- bedroom units. The newly constructed buildings, as currently contemplated, will contain a unit mix comprised of 10 one-bedroom units and 18 two-bedroom units. The following tables better illustrate the overall Project unit count and mix. Existing Building (built 1968) Units Avg. SF One Bedroom Units 8 785 Two Bedroom Units 10 890-990 Total Units 18 New Buildings Units Avg. SF One Bedroom Units 10 1,100 SF Two Bedroom Units 18 1,575 SF Total Units 28 Combined Units One Bedroom Units 18 Two Bedroom Units 28 Total Units 46 Parking and Amenities Interior flnishes will include hard surface countertops, hard-surface fiooring except for carpet in the bedrooms and quality lighting and plumbing flxtures. Most, if not all, units will have private balconies, in-unit washer/dryers, and all 2+ bedrooms in the new building will contain en-suite bathroom. Once complete each resident will have access to at least one enclosed garage stall. Overall, project will contain a total of 62 parking stalls, or 2.21 stalls per unit – a more than 2:1 parking ratio. Trash will be collected within the building footprint. It will be set out on the designated trash day and returned within the parking garage after collection. 8 3 The new building will include shared amenity spaces for all Project residents to enjoy, including a dog run, outdoor patio with grilling stations and a flre pit, and a trail connection to the existing city trail system. Architectural Design The project resides within the Saratoga 3rd Addition and will be required to comply with Chapter 20 of the Chanhassen City Code which provides guidance as to the expected architectural standards. Speciflcally exterior material be of high quality and durable, consisting of glass, wood or other quality materials as deemed acceptable by the city. The roof will be pitched with high quality shingles. Landscaping will meet or exceed the code, and signage will comply with the sign ordinance for residential districts. Sustainability The project will utilize many green building methods during construction and the Project itself will include low fiow plumbing flxtures, low VOC paints, LED lighting where appropriate. Currently the site does not treat any stormwater runoff. New stormwater ponding will be created with the Project utilizing the stormwater runoff from the site for irrigation of the proposed plantings. Financing and Affordability In addition to design, the Project also need to be flnancially viable. The project team is currently assessing how the tariff environment will affect construction pricing and what the current flnancing environment looks like for a smaller project such as Santa Vera. To upgrade the existing units, we expect a flnancing “gap” will exist that will need to be overcome in order to make the rehabilitation of the existing building viable. We will work with city staff to determine what city, county, and state funding tools are available for the creation and preservation of naturally occurring affordable housing (NOAH). We do not anticipate requesting TIF. Many of the existing units at Santa Vera already qualify as NOAH units. However, those units along with the existing exterior of the building are old and tired and in need of some updates. Any city, county, and/or state assistance will help aid in the renovations while also helping preserve the existing affordability. The overall Project aims to achieve slightly lower rents than the new luxury projects that recently opened and are currently under construction in Downtown Chanhassen. Given the allowed density and site constraints, Santa Vera will not be able to compete with the amenities provided at the Venue, Harlow, or Bennett. As such, it will not be able to command the top of the market rents. However, it 9 4 will serve a very important niche by providing housing to the missing middle – a very underserved segment of the current housing market. Given the investment and focus by the city’s leadership on creating a vibrant downtown, the preservation of existing NOAH units, along with the creation of new moderately priced rental homes near the city center is vital. Those that provide vital city services, as well as those that work at area restaurants, shops, and businesses should also be able to live near where they work. Santa Vera is uniquely located and positioned to expand the city’s housing options and help add to the vibrancy of the surrounding area. Phasing and Construction Schedule It is anticipated that the project will commence construction late fall of 2025. Initial activities will include site clearing, installation of utilities and infrastructure, rough grading and excavation, and then vertical construction. Simultaneously, renovations will occur in the existing 18-unit building. We will purposely keep at least one unit vacant in the existing building to serve as a “hotel” unit for residents to use while their unit is being updated. It is anticipated that the entire duration of construction will be approximately fourteen (14) months. Development Method Headwaters intends to develop and own the project for the foreseeable future. Headwaters is a Twin-Cities based company. The principals of Headwaters have a successful track record, and have been involved in the development, acquisition, and rehabilitation of over 5,000 units translating to over $2 billion worth of projects spanning the Midwest, Central Plains, and Mountain West regions of the Unit States. 10 DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\COVER SHEET.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N2RPBCWD Rev-207.29.2025PRELIMINARY PLANSCLIENT:ENGINEER/LANDSCAPE ARCHITECT:ARCHITECT:SANTA VERA APARTMENTSSHEET INDEX:FOR:VICINITY MAP- NOT TO SCALEC1.0COVER SHEETMEASURE GROUP - PETE MOREAU, PE (MN)PO BOX 10WAYZATA, MN 55391PH: 612-440-0934EMAIL: PMOREAU@MEASUREGRP.COMMEASURE GROUP - JOSH MCKINNEY, PLA (MN)PO BOX 10WAYZATA, MN 55391PH: 612-440-0934EMAIL: JMCKINNEY@MEASUREGRP.COMHEADWATERS6757 KARMEN AVEALBERTVILLE, MNPH: 612-508-4627EMAIL: RCS@HEADWATERS.BUILDSheet NumberSheet TitleC1.0COVER SHEETC2.1DEMOLITION PLANC3.0SITE PLANC4.0GRADING PLANC5.0UTILITY PLANC5.1STORM SEWER PLANC6.0PHASE 1 EROSION CONTROLC6.1PHASE 2 EROSION CONTROLC7.0SWPPP NARRATIVE & NOTESC7.1SWPPP NARRATIVEC8.0CIVIL DETAILS - UTILITY DETAILSC8.1CIVIL DETAILS - STORM SEWER DETAILSC8.2CIVIL DETAILS - STORM SEWER DETAILSC8.3CIVIL DETAILS - SITE DETAILSC8.4CIVIL DETAILS - ADA DETAILSC8.5CIVIL DETAILS- ADA DETAILS -CONTINUEDL0.1TREE PRESERVATION PLAN - TREE INVENTORYL0.2TREE PRESERVATION PLANL1.0LANDSCAPE PLANKAAS WILSON ARCHITECTS - KIM BEHRENS1301 AMERICAN BLVD.BLOOMINTON, MN 55425PH: 612-279-8917EMAIL: KIMB@KAASWILSON.COMSITEW 78TH STLAREDO DRIVEKERBER BLVDSANTA VERA DR11 |||||||||||||||||||||||||||||||||||||||||||||||||||UEUEUEUEUEUEUEUEUEUEUEUEUE UE UE UEUE UE UE UE UEUEUEUE UE UE UE UE U E UEGGGGGG G G G G GGGGGGGGGGGG GGGGGGGG606050 5050XXXXX X15" RCP 12" RCP12" RCP 15" PVC15" RCP 24" RCP8" METAL8" PVC8" METAL 8" VCP (PER PLAN)GMEMGM2 STORY FRAME & STUCCO MULTI-UNIT BUILDINGAREA = 9103 SFBLDG #611BLDG #6211 Story Frame & Stucco Garage ComplexArea = 4630 SFCOVERED ENTRYCOVERED ENTRYCOVERED ENTRYCOVERED ENTRYCOVERED ENTRYCANTILEVERW O O D SH E DDeck SIGN "STOP"SIGN "STOP"SIGN "NO PARKING"SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVE PID: 257620020OWNER: SANTA VERA APARTMENTS LLCPID: 257620010OWNER: CHANHASSEN CITYBITUMINOUS TRAIL BITUMINOUS TRAILBITUMINOUS PARKING LOTSIGN "15MPH"1' BLOCKRET. WALL1' BLOCKRET. WALL1' BLOCKRET. WALL4' WOODRET. WALLUNKNOWN UPSTREAMSANITARY LOCATIONTTCHAIN LINKFENCE1' BLOCKRET. WALLCABXSATELLITE DISHCABX10 1010101010101010 10 10 10 101010ROOF OVERHANGROOF OVERHANG12" RCP21" RCP12" PVC1 8 " P V C 8" PVC (PER PLAN) 8" DIP (PER PLAN)6" DIP (PER PLAN)8" DIP (PER PLAN) 8" PVC (PER PLAN)8" CIP (PER PLAN)8" ABS (PER PLAN)8" ABS (PER PLAN)SAN SEWER (PER GSOC)WATER 6" DIP (PER GSOC & PLAN)50 DELRIODRIVE5021" RCPPORTABLESHEDCABXROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)WOODBENCHESFIRE PITCONCRETE STAIRSW/ HANDRAILWOOD MULCHCONCRETE STAIRSW/ HANDRAILCONCRETESTAIRSROCK MULCH (TYP.)ROCK MULCH (TYP.)GRAVEL LOTNO PARKINGDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONCBRE=990.37INV=987.37 NEINV=987.35 SCBRE=990.62CBRE=990.39INV=990.39 NINV=987.36 WCBRE=988.64INV=982.90 NINV=982.87 SINV=984.64 SWCBRE=987.59INV=981.39 NINV=981.43 SINV=983.02 WCBRE=987.33CBRE=987.77INV=981.35 NINV=981.31 SCBRE=987.74INV=981.12 EINV=981.15 SSTSTMHRE=988.19INV=980.55 WINV=? NE/SESUMP=974.87WEIR=982.93NOTCH=980.59STSTMHRE=988.01STSTMHRE=988.04H YDSSSSMHRE=988.50INV=975.88 WINV=975.85 E#111-20" ash#113-10" spruce#114-28" maple#116-60" basswood, multi-stem#117-30" maple#1-boxelder, 3-stem(8,8,8)#2-13" boxelder#5-poplar, 2-stem(15,13)#3-boxelder, 3-stem(8,8,4)#6-poplar, 4-stem(20,20,20,10)#8-13" poplar#22-poplar, 2-stem(20,16)#23-poplar, 2-stem(24,12)#24-poplar, 2-stem(20,20)#25-poplar, 2-stem(10,6)#110-16" pine#109-30" maple#108-22" maple#107-26" maple#106-14" pine#4-boxelder, 4-stem(10,8,6,5)#12-10" boxelder#112-22 maple#105-22" pine#104-15" pine#102-14" pine#101-15" ash#100-14" ash#98-20" spruce#99-18" maple#103-16" pine#97-15" spruce#96-20" mapleCBRE=994.17INV=991.53 SWINV=990.37 EINV=990.35 WSSSSMHRE=995.24CBRE=995.23INV=990.75 ECBRE=994.83CBRE=995.60HHCBRE=995.72INV=992.08 NEINV=991.88 SWCBRE=996.29INV=992.59 NEINV=992.85 SW#86-50" cottonwood#85-20" cottonwood#84-16" boxelder#83-14" boxelder#81-11" boxelder#82-20" crabapple#87-12" maple#88-ash, 2-stem(8,8)#89-22" maple#90 15" maple#91-16" maple#95-48" maple#94-18" maple#93-15" maple#92-15" maple#131-10" red cedar#133-12" cottonwood#132-10" red cedar#79-15" crabapple#80-12" crabapple#78-boxelder, 4-stem(8,8,6,6)#126-11" cottonwood#125-10" elm#124-10" red cedar#123-14" cottonwood#122-10 cottonwood#121-30" cottonwood#120-18" cottonwood#119-10" cottonwood#118-28" maple#26-poplar, 3-stem(20,14,14)#27-20" poplar#28-24" poplar#29-14" poplar#33-11" poplar#32-20" poplar#30-30" poplar#31-poplar, 2-stem(14,14)#7-18" poplar#9-boxelder, 2-stem(10,8)#10-poplar, 2-stem(42,13)#11-35' spruce#16-20" poplar#14-11" boxelder#13-60" cottonwood#15-11" boxelder#20-10" boxelder#19-26" poplar#18-24" poplar#17-24" poplar#37-10" boxelder#35-10" boxelder#36-10" boxelder#34-10" boxelderHYD TNH996.69CSSSSSMHRE=993.60INV=983.83 NEINV=983.86 SW (ORIFICE, NO PIPE)SSSSMHRE=994.50INV=982.01 SWINV=982.60 NWINV=982.08 E#48-10" boxelder#41-10" boxelder#21-boxelder, 3-stem(10,10,10)#38-10" boxelder#39-36" poplar#40-36" poplar#42-10" boxelder#43-14" boxelder#44-16" boxelder#51-11" boxelder#52-10" boxelder#53-12" boxelder#54-11" boxelder#55-10" ash#45-11" boxelder#47-14" boxelder#46-10" boxelder#49-11" boxelder#50-silver maple, 5-stem(12,12,9,6,4)#59-10" maple#60-silver maple, 4-stem(18,16,10,8)#70-26" silver maple#58-10 ash#56-10" ash#57-10" ash#61-basswood, 4-stem(8,8,6,4)#63-12" crabapple#62-10" boxelder#64-14" ash#65-10" ash#66-10" ash#67-12" ash#74-10" boxelder#73-14" boxelder#68-silver maple, 3-stem(8,5,4)#69-16" silver maple#71-15" maple#72-15" maple#75-12" elm#76-14" ashGM#127-12" cottonwood#128-cottonwood, 2-stem(10,8)#129-10" maple#130-15" cottonwood#77-15' red cedarAREA : 167713.25 SF3.85 ACRES8.00N16°56'27"EL=137.87meas.(137.88plat)R=474.00Δ=16°39'56"meas.(16°40'00"plat)N89°43'33"W 78.00N00°16'27"E 513.79N89°11'28"W 174.96N53°31'23"W 254.72N00°20'03"E 252.00 L=219.05R=171.00Δ=73°23'36"47.222 . 5 46.222 . 1 46.222 . 2 70.516 . 1 23.514 . 2 16.522 . 517.214 . 1 23.516 . 1 68.822 . 2 46.222 . 1 1. 0 24 . 0 31.81. 0 8.61. 0 43.24. 0 24.040 . 6 83.624 . 0 83.04. 0 24.08.631.842.61. 0 48.61005.91005.51005.71005.81001.61001.41001.61001.81001.01001.61001.0998.4998.8999.1999.2999.1998.9998.7998.7 997.8995.6997.2995.0994.6995.2993.4993.2993.1993.5993.8992 . 6 994.4995.7999.0996.9995.8997.0995.3995.699 5 . 7 9 9 4 . 4 994.2993.2992.3993.7994.8995.3995.8996.1995.8996.0995.6994.7994.8994.4993.5993.7991.8992.5994.8995.9992.2991.4993.8996.7997.8997.4995.3997.9995.7991.1991.7993.9995.2995.5996.2996.6997.2997.41000.71001.61003.21002.41001.9996.5995.7993.5992.7992.5991.1991.2990.8990.4993.1991.3990.2989.2990.8990.7990.3990.79 9 2 . 5 993.8991.8989. 4 989.3989.2989.0988.6988.7990.2991.4991.4992.0992.5989.4990.3990.7999.2998.7998.59 9 8 . 5 1001.7 992.6992.8 990 991 992 993 994 9 9 2 99 3 99 4993994995996 992 99 3 990 991 992 993991992 996 997 998 9991000 99899910001001100110021002100310031004100410051005 99699799899910001001 992 993 994995991 99299 3 991 992 993 991 992 993 995 991991991992993994995996997991990 991 992 993 994 990 989 989 996 996989 989 988 995996 997 998 999 1000 100110021003 1004 10059991000100110021003992 99 3 99 4 995 996 997 99 8 997 994992995996994993995WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.60REMOVE & SALVAGEHYDRANT FOR FUTURE USEREMOVE FIREPIT& BENCHESREMOVE DECKREMOVE GRAVELPARKING AREAREMOVEEXISTINGSIDEWALKREMOVERETAINING WALLREMOVE SHEDREMOVE PAVEMENTREMOVESATELLITE DISHSEE TREE PRESERVATIONPLAN ON SHEET L0.1 FORTREE REMOVALSSANITARY LINELOCATED PERGSOC. IF THISLINE EXISTS,REMOVE TOTHE EXTENTSSHOWN ONTHIS PLANREMOVE SANITARY MANHOLEREMOVEPORTION OFRETAINING WALL.SEE SITE ANDGRADING PLANSREMOVE EXISTINGSANITARY MHREMOVE EXISTING 6" DIPWATER LINE TO THEEXTENTS SHOWN.REMOVE PAVEMENTREMOVE PAVEMENTREMOVE PED RAMPSAND DRIVE APRONDescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\DEMOLITION PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalLandscape Architect under thelaws of the State of Minnesota.1RPBCWD Rev-107.21.2025Sheet:XX.XX.XX53234Joshua J McKinney, PLAN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C2.1DEMOLITION PLANLEGENDEXISTINGPROPOSEDPROPERTY BOUNDARYLOT LINESETBACK LINERIGHT OF WAY LINEEASEMENTSTANDARD CURB AND GUTTERFENCERETAINING WALLSCALE IN FEET060301.DEMOLITION NOTES ARE NOT COMPREHENSIVE. CONTRACTOR SHALL VISIT THE SITE PRIOR TOCONSTRUCTION TO OBTAIN A CLEAR UNDERSTANDING OF THE INTENDED SCOPE OF WORK.2. THE DESIGN SHOWN IS BASED ON ENGINEER'S UNDERSTANDING OF EXISTING CONDITIONS.THE EXISTING CONDITIONS SHOWN ON THIS PLAN ARE BASED UPON ALTA AND TOPOGRAPHICMAPPING PREPARED BY XXXX DATED XX-XX-XXXX. IF CONTRACTOR DOES NOT ACCEPTEXISTING TOPOGRAPHY AS SHOWN ON THE PLANS WITHOUT EXCEPTION, CONTRACTOR SHALLHAVE MADE, AT OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYORAND SUBMIT IT TO THE OWNER FOR REVIEW.3. THE CONTRACTOR IS RESPONSIBLE FOR DEMOLITION, REMOVAL, AND DISPOSING INALOCATION APPROVED BY ALL GOVERNING AUTHORITIES AND IN ACCORDANCE WITHAPPLICABLE CODES, OF ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING,DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ONTHE PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TOSUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PERTHE GEOTECHNICAL REPORT AND/OR GEOTECHNICAL ENGINEER.4.CLEARING AND GRUBBING: CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROMTHE SITE AND DISPOSING THE DEBRIS IN A LAWFUL MANNER. CONTRACTOR IS RESPONSIBLEFOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL.5.. CONTRACTOR IS RESPONSIBLE FOR THE DISCONNECTION OF UTILITY SERVICES TO EXISTINGBUILDINGS PRIOR TO DEMOLITION OF THE BUILDINGS.6. CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO REMOVALAND/OR RELOCATION OF UTILITIES. CONTRACTOR SHALL COORDINATE WITH UTILITYCOMPANIES CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITYCOMPANIES' FORCES AND ANY FEES WHICH ARE TO BE PAID TO UTILITY COMPANIES FORSERVICES. CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES.7. CONTRACTOR IS SPECIFICALLY CAUTIONED THAT LOCATIONS OF EXISTING UTILITIES SHOWNON THIS PLAN HAVE BEEN DETERMINED FROM INFORMATION AVAILABLE. ENGINEER ASSUMESNO RESPONSIBILITY FOR THE UTILITY MAPPING ACCURACY. PRIOR TO START OF ANYDEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES 48 HOURS PRIORTO ANY EXCAVATION FOR ON-SITE LOCATIONS OF EXISTING UTILITIES. THE LOCATIONS OFUTILITIES SHALL BE OBTAINED BY THE CONTRACTOR BY CALLING MINNESOTA GOPHER STATEONE CALL AT 800-252-1166 OR651-454-0002.8.THE MAPPING LOCATION OF ALL EXISTING SEWERS, PIPING, AND UTILITIES SHOWN ARE NOT TOBE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT MAY OCCUR ONTHE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANYANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTIONAND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH WORK.UTILITIES DETERMINED TO BE ABANDONED SHALL BE REMOVED IF UNDER THE BUILDINGINCLUDING 10' BEYOND FOUNDATIONS.9.ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BEREMOVED OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY.ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THEUTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE.CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN THE ROAD RIGHTOF WAY DURING CONSTRUCTION.10.CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES,ENCLOSURES, ETC., TO THE BEST PRACTICES.11.CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALLTIMES DURING DEMOLITION OF THE EXISTING FACILITIES12.PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLEDAND APPROVED BY THE LOCAL AUTHORITY.13.CONTRACTOR SHALL LIMIT SAW-CUT & PAVEMENT REMOVAL TO ONLY THOSE AREAS WHEREIT IS REQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS INCURREDON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FORITS REMOVAL AND REPAIR.14.CONTRACTOR TO PROTECT EXISTING FEATURES WHICH ARE TO REMAIN. DAMAGE TO ANYEXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE.15.ABANDON OR REMOVE ALL SANITARY, WATER AND STORM SERVICES PER CITY STANDARDS.COORDINATE ALL WORK WITH CITY. ALL STREET RESTORATION SHALL BE COMPLETED INCOMPLIANCE WITH LOCAL STANDARDS.16.CONTRACTOR SHALL PREPARE AND SUBMIT TO THE GOVERNING AUTHORITY A TRAFFICAND/OR PEDESTRIAN TRAFFIC PLAN PER CITY/COUNTY/STATE STANDARDS TO BE APPROVEDBY THE LOCAL GOVERNING AUTHORITY.DEMOLITION NOTES12 606050 5050XXXXX XEMSIGN "STOP"SIGN "STOP"SIGN "NO PARKING"SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEPID: 257620010OWNER: CHANHASSEN CITYBITUMINOUS TRAIL BITUMINOUS TRAILBITUMINOUS PARKING LOTSIGN "15MPH"TTCHAIN LINKFENCE10 1010101010101010 10 10 10 10101050 DELRIODRIVE50 ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)WOOD MULCHCONCRETESTAIRSROCK MULCH (TYP.)ROCK MULCH (TYP.)Drainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONWEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.60HYD D2 STORYMULTIFAMILY12 UNITSFFE: 995.00GFE: 994.832 STORYMULTIFAMILY16 UNITSFFE: 996.00GFE: 995.83HYD DDSTORMWATER RETENTION(NURP) BASINS±44,590 C.F. COMBINEDTOTAL LIVE STORAGE±8,590 C.F. COMBINEDTOTAL DEAD STORAGETOP BERM: 993.00E.O. SPILLWAY: 992.50HWL: 992.06WQVE: 990.40NWL: 988.30RE-USE SHUTOFF: 987.00BOTTOM: 984.00D6111166677878785.0'5.0'R5.0'TYP.R27.0'R15.0'26.0'18.0'24.0'18.0'24.0'222213.0'5.0'22.3'116.7'50.7'87233333345DDDDDBA6C8DOGRUNRESIDENTPATIO1010BR15.0'R52.0'R15.0'R5.0'R15.0'R15.0'R5.0'TYP.3911121212129113E32.9'25.8'26.6'23.8'22.0'4.3'23.3'DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\SITE PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C3.0SITE PLANLEGENDDEVELOPMENT SUMMARYKEYNOTESB6-12 CURB & GUTTER1ZONING INFORMATIONCURRENT SITE ZONING:PROPOSED SITE ZONING:SITE DATATOTAL SITE AREA:DENSITYTOTAL UNITS:DENSITY:BUILDING SETBACKSFRONT:SIDE:REAR:PARKING-EXISTING 1.89/UNITENCLOSEDEXTERIORTOTALPARKING- NEW - 2.21/ UNITENCLOSEDEXTERIORTOTALSITE PARKING RATIOPARKING DIMENSIONSSTALL DIMENSIONSDRIVE AISLE WIDTHIMPERVIOUS SURFACEREQUIREDPROPOSEDPUDPUD3.85 ACRES50'20'20'50.7'22.3'22.3'28 STALLS28 STALLS56 STALLS28 STALLS34 STALLS62 STALLS2 STALLSPER UNIT2.21 STALLSPER UNIT65% MAXPER PUD50.4%9x18'24'9'x18'24'&26'20 UPA MAX46 UNITS11.95 UPAADA SIGNAGE & BOLLARDS - SEE CIVIL DETAILS2ADA PARKING STRIPING - SEE CIVIL DETAILS3PEDESTRIAN RAMP WITH TRUNCATED DOMES4FLUSH CURB5CONCRETE SIDEWALK6LIGHT POLE WITH FOUNDATION7RETAINING WALL WITH FENCE85' CURB TRANSITION- SEE GRADING PLAN936" CHAIN LINK FENCE - BLACK, VINYL COATED10STOP SIGNMATCH EXISTINGPROPOSEDPROPERTY BOUNDARYSETBACK LINERIGHT OF WAY LINEEASEMENTSTANDARD CURB AND GUTTERHEAVY DUTY BITUMINOUS PAVEMENTLIGHT DUTY BITUMINOUS PAVEMENTCONCRETE SIDEWALKHEAVY DUTY CONCRETE PAVEMENTFENCERETAINING WALL (BY OTHERS)TRAFFIC SIGNLIGHT POLESCALE IN FEET06030GRILL STATION - SEE ARCHITECTURAL DETAILSDESIGN BY OTHERSABC17 STALLS17 STALLS34 STALLS11SAW CUT PAVEMENT - MEET AND MATCHAIR CONDITIONING UNITSD12FIRE LANE- NO PARKING SIGNAGEIRRIGATION PUMP STATION (STORMWATER REUSE)E13 |||||||||||||||||||||||||||||||||||||||||UEUEUEUEUEUEUEUEUEUEUEUEUE UE UE UEUE UE UE UE UEUEUEUE UE UE UE UE UEUEGGGGGGGG G G GGGGGGGGGGGG GGGGGGGGXXXXXX15" RCP 12" RCP12" RCP 15" PVC15" RCP 24" RCP8" VCP (PERPLAN)SIGN "STOP"SIGN "STOP"SIGN "NO PARKING"SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEPID: 257620010OWNER: CHANHASSEN CITYSIGN "15MPH"CHAIN LINKFENCE10 1010101010101010 1 0 10 10 10101012" RCP1 5 " R C P 21" RCP12" PVC1 8 " P VC 8" PVC (PER PLAN) 8" DIP (PERPLAN)6" DIP (PER PLAN)8" DIP (PERPLAN) 8" PVC (PER PLAN)8" CIP (PERPLAN)8" ABS (PERPLAN)8" ABS (PERPLAN)DELRIODRIVE21" RCPROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)WOOD MULCHCONCRETESTAIRSROCK MULCH (TYP.)ROCK MULCH (TYP.)GRAVEL LOTDrainage and UtilityEasement per SARATOGA3RD ADDITIONDrainage and UtilityEasement per SARATOGA3RD ADDITIONDrainage and UtilityEasement per SARATOGA3RD ADDITIONCBRE=990.37INV=987.37 NEINV=987.35 SCBRE=990.62CBRE=990.39INV=990.39 NINV=987.36 WCBRE=988.64INV=982.90 NINV=982.87 SINV=984.64 SWCBRE=987.59INV=981.39 NINV=981.43 SINV=983.02 WCBRE=987.33CBRE=987.77INV=981.35 NINV=981.31 SCBRE=987.74INV=981.12 EINV=981.15 SSTSTMHRE=988.19INV=980.55 WINV=? NE/SESUMP=974.87WEIR=982.93NOTCH=980.59STSTMHRE=988.01STSTMHRE=988.04H YDSSSSMHRE=988.50INV=975.88 WINV=975.85 ECBRE=994.17INV=991.53 SWINV=990.37 EINV=990.35 WSSSSMHRE=995.24CBRE=995.23INV=990.75 ECBRE=994.83CBRE=995.60CBRE=995.72INV=992.08 NEINV=991.88 SWCBRE=996.29INV=992.59 NEINV=992.85 SW1005.91005.51005.71005.81001.61001.41001.61001.81001.01001.61001.0998.4998.8999.1999.2999.1998.9998.7998.7 997.8995.6997.2995.0994.6995.2993.4993.2993.1993.5993.8992 . 6 994.4995.7999.0996.9995.8997.0995.3995.699 5 . 7 9 9 4 . 4 994.2993.2992.3993.7994.8995.3995.8996.1995.8996.0995.6994.7994.8994.4993.5993.7991.8992.5994.8995.9992.2991.4993.8996.7997.8997.4995.3997.9995.7991.1991.7993.9995.2995.5996.2996.6997.2997.41000.71001.61003.21002.41001.9996.5995.7993.5992.7992.5991.1991.2990.8990.4993.1991.3990.2989.2990.8990.7990.3990.79 9 2 . 5 993.8991.8989. 4 989.3989.2989.0988.6988.7990.2991.4991.4992.0992.5989.4990.3990.7999.2998.7998.59 9 8 . 5 1001.7 992.6992.8 99 0 991 99 2 993 994 99299399499399499599699 2 993 9 9 0 99 1 99 2 99 3991992 996 997 998 999 1000 99899910001001100110021002100310031004100410051005 99699799899910001001992 993994995991 9 9 2 9 9 3 991 992 993 991 992 99 3 995 991991991992993994995996997991990 991 992 993 994 990 989 989 996 996989 989 988 9 9 5 99 6 997 998999 10001001100210031004100599910001001100210039929 9 3 9 9 4 995 99 6 99 7 9 9 8 9 9 7 994992995996994993995WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.60|||||||||||||HYD D| |2 STORYMULTIFAMILY12 UNITSFFE: 995.00GFE: 994.832 STORYMULTIFAMILY16 UNITSFFE: 996.00GFE: 995.83SSHYD DDSTORMWATER RETENTION(NURP) BASINS±44,590 C.F. COMBINEDTOTAL LIVE STORAGE±8,590 C.F. COMBINEDTOTAL DEAD STORAGETOP BERM: 993.00E.O. SPILLWAY: 992.50HWL: 992.06WQVE: 990.40NWL: 988.30RE-USE SHUTOFF: 987.00BOTTOM: 984.00DLODLODLODLODLOD LODLODL O D LODLODLOD LODLODLODLODLOD LODL O D LODLODLODLODLODLODLODLODLOD LOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLOD LOD LOD LOD LOD LOD LOD |||||||||||||||||||||||||||||||||||||||||UEUEUEUEUEUEUEUEUEUEUEUEUE UE UE UEUE UE UE UE UEUEUEUE UE UE UE UE UEUEGGGGGGGG G G GGGGGGGGGGGG GGGGGGGGXXXXXX15" RCP 12" RCP12" RCP 15" PVC15" RCP 24" RCP8" VCP (PERPLAN)SIGN "STOP"SIGN "STOP"SIGN "NO PARKING"SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEPID: 257620010OWNER: CHANHASSEN CITYSIGN "15MPH"CHAIN LINKFENCE10 1010101010101010 1 0 10 10 10101012" RCP1 5 " R C P 21" RCP12" PVC1 8 " P VC 8" PVC (PER PLAN) 8" DIP (PERPLAN)6" DIP (PER PLAN)8" DIP (PERPLAN) 8" PVC (PER PLAN)8" CIP (PERPLAN)8" ABS (PERPLAN)8" ABS (PERPLAN)DELRIODRIVE21" RCPROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)WOOD MULCHCONCRETESTAIRSROCK MULCH (TYP.)ROCK MULCH (TYP.)GRAVEL LOTDrainage and UtilityEasement per SARATOGA3RD ADDITIONDrainage and UtilityEasement per SARATOGA3RD ADDITIONDrainage and UtilityEasement per SARATOGA3RD ADDITIONCBRE=990.37INV=987.37 NEINV=987.35 SCBRE=990.62CBRE=990.39INV=990.39 NINV=987.36 WCBRE=988.64INV=982.90 NINV=982.87 SINV=984.64 SWCBRE=987.59INV=981.39 NINV=981.43 SINV=983.02 WCBRE=987.33CBRE=987.77INV=981.35 NINV=981.31 SCBRE=987.74INV=981.12 EINV=981.15 SSTSTMHRE=988.19INV=980.55 WINV=? NE/SESUMP=974.87WEIR=982.93NOTCH=980.59STSTMHRE=988.01STSTMHRE=988.04H YDSSSSMHRE=988.50INV=975.88 WINV=975.85 ECBRE=994.17INV=991.53 SWINV=990.37 EINV=990.35 WSSSSMHRE=995.24CBRE=995.23INV=990.75 ECBRE=994.83CBRE=995.60CBRE=995.72INV=992.08 NEINV=991.88 SWCBRE=996.29INV=992.59 NEINV=992.85 SW1005.91005.51005.71005.81001.61001.41001.61001.81001.01001.61001.0998.4998.8999.1999.2999.1998.9998.7998.7 997.8995.6997.2995.0994.6995.2993.4993.2993.1993.5993.8992 . 6 994.4995.7999.0996.9995.8997.0995.3995.699 5 . 7 9 9 4 . 4 994.2993.2992.3993.7994.8995.3995.8996.1995.8996.0995.6994.7994.8994.4993.5993.7991.8992.5994.8995.9992.2991.4993.8996.7997.8997.4995.3997.9995.7991.1991.7993.9995.2995.5996.2996.6997.2997.41000.71001.61003.21002.41001.9996.5995.7993.5992.7992.5991.1991.2990.8990.4993.1991.3990.2989.2990.8990.7990.3990.79 9 2 . 5 993.8991.8989. 4 989.3989.2989.0988.6988.7990.2991.4991.4992.0992.5989.4990.3990.7999.2998.7998.59 9 8 . 5 1001.7 992.6992.8 99 0 991 99 2 993 994 99299399499399499599699 2 9939 9 0 99 1 99 2 99 3991992 996 997 998 999 1000 99899910001001100110021002100310031004100410051005 99699799899910001001992 993994995991 9 9 2 9 9 3 991 992 993 991 992 99 3 995 991991991992993994995996997991990 991 992 993 994 990 989 989 996 996989 989 988 9 9 5 99 6 997 998999 10001001100210031004100599910001001100210039929 9 3 9 9 4 995 99 6 99 7 9 9 8 9 9 7 994992995996994993995WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.609 9 4 996995996996 993 99 2 99 0 987992993994994994991992993 99199298998799199299 3 996997998999989 990 991 992 993 988 990988 9949989979989969979959969 9 7 99 8 99399099499 5996997995995 994 990997999996 989993993993 991990991992993 993987 996 98799599499499 1 99399098 8 993989 991 993993 9891.9%-18.0%-5.7%-1.6%-1.5%-2.4%-5.8%-2.5%-107.8%-2.5%-2.0%-1.7%-2.0%-2.0%-2.0%-2.0%-2.0%-2.0%-2.0%-1.5%-1.5%-1.5%-2.5%-3.0%-3.0%-3.7%-2.4%-2. 0 %-7.6%-0.5%-24.9%-15.3%-1.5% -33.3%-30.0%-26 .0%-2.0%-2.0%-2.8%-2.5%-1.5%-2.0%-4.3%-2.3%-2.0%- 2 . 1% -1. 6 % -1.5% -1. 5 %-3.0%-1.5%-1.6%-24.0%-2.0%-2.0% -1.7%-33.3%-33.3%-33.3%-18 . 0 %-2.4%-1.5%99 3 992 994 996995-1.7%-2.0% -1.7%-3.5%-2.5%LODLODLODLODLOD LODLODL O D LODLODLOD LODLODLODLODLOD LODL O D LODLODLODLODLODLODLODLODLOD LOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLOD LOD LOD LOD LOD LOD LOD 993 984 98 7987 991989-33.3% 98 9 98 7 988984984993991989991 993988-33.3%-33.3%-33.3%991 989989 995.05 M.E.995.10 BW995.10 BW995.50 BW995.30 TW997.00 TW997.50 TW995.15995.83995.83996.00996.70996.75995.70 M.E.995.20 M.E.995.75 E.O.995.75995.67995.67994.50995.00994.50995.00994.50995.00994.50995.001000.30 M.E.995.75995.67995.801001.40 TW995.40 BW1002.10 TW995.10 BW1003.90 TW995.10 BW1004.60 TW995.13 BW1004.60 TW995.10 BW1003.80 TW995.10 BW1002.20 TW995.10 BW1000.80 TW995.10 BW1000.30 TW995.67 BW995.45995.65995.73995.44994.67994.75993.00988.23988.16995.20995.30995.10994.60994.60995.10995.10994.50994.60994.30994.23994.50994.15994.99994.20993.51993.50993.60995.50 M.E.994.20994.20994.28994.28994.80994.79994.85994.85994.80994.48994.40994.40994.48994.81994.73994.20994.17993.83993.80988.66988.71994.85993.90994.77994.77995.78995.86995.83995.83995.83995.83995.83995.83995.68995.86995.78994.20994.83994.83994.86994.75994.67994.75994.86994.67994.85994.72994.83995.05995.10994.40 E.O.995.62995.75995.67995.86995.75996.80996.30996.10993.30993.30 M.E.993.50 M.E.994.52994.60 E.O.994.80994.85995.25995.01994.42994.42994.92994.92995.00994.58993.90994.20994.77994.77994.50995.50995.00995.40994.50994.72994.65994.90995.05987.94 E.O.987.73988.10988.30 M.E.988.02988.96 M.E.993.30993.40994.20994.83994.81994.85995.00995.00995.00995.00995.75994.901000.50 TW1000.00 BW995.77995.77995.83995.83995.83994.80994.50995.18994.50994.65994.80994.90993.30993.60987.83987.60988.73988.78992.50 E.O.992.50 E.O.993.00993.00993.00993.00993.00993.00993.00993.00993.00988.30993.00993.00993.00993.00995.33995.20995.86996.00996.00996.00995.83999.00 TW998.50 BW996.00996.05995.90 M.E.995.50 M.E.995.50 M.E.990.70 M.E.992.60 M.E.992.10 M.E.992.50 M.E.991.00994.73994.58994.53996.00996.00996.00995.86995.86995.86995.67995.70 E.O.994.40994.65994.77994.80994.58995.77995.77995.45995.75995.25994.83994.83995.00995.00988.24 M.E.??? M.E.989.04 M.E.988.25 M.E.987.72 M.E.987.70 M.E.993.30 E.O.993.80993.70993.45993.37992.12992.20988.83988.78988.73990.70 M.E.991.25991.35991.10987.90993.20993.20988.30988.30993.20994.65993.00993.00993.00993.00988.30988.30988.30988.30988.30988.30988.30988.30988.30988.30988.30988.30988.30988.30988.30988.30988.30993.20993.00993.00DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\GRADING PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C4.0GRADING PLANLEGENDGRADING NOTES1.LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES ASSHOWN ON THIS PLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFYSITE CONDITIONS AND UTILITY LOCATIONS PRIOR TOEXCAVATION/CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELYIF ANY DISCREPANCIES ARE FOUND.2.CONTRACTORS SHALL REFER TO ARCHITECTURAL PLANS FOR EXACTLOCATIONS AND DIMENSIONS OF VESTIBULE, SLOPED PAVEMENT, EXITPORCHES, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS, EXACTBUILDING UTILITY ENTRANCE LOCATIONS, AND EXACT LOCATIONS ANDNUMBER OF DOWNSPOUTS.3.ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF"STANDARD SPECIFICATIONS FOR TRENCH EXCAVATION ANDBACKFILL/SURFACE RESTORATION" AS PREPARED BY THE CITY ENGINEERSASSOCIATION OF MINNESOTA.4.ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE SIX INCHES OF TOPSOIL ANDSOD OR SEED. THESE AREAS SHALL BE WATERED UNTIL A HEALTHY STAND OFGRASS IS OBTAINED. SEE LANDSCAPE PLAN FOR PLANTING AND TURFESTABLISHMENT.5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAININGTRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS,DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OFTRAFFIC WHERE NECESSARY. PLACEMENT OF THESE DEVICES SHALL BEAPPROVED BY THE ENGINEER PRIOR TO PLACEMENT. TRAFFIC CONTROLDEVICES SHALL CONFORM TO APPROPRIATE MNDOT STANDARDS6.ALL SLOPES SHALL BE GRADED TO 3:1 OR FLATTER, UNLESS OTHERWISEINDICATED ON THIS SHEET.7.CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADINGAND PROVIDE A SMOOTH FINISHED SURFACE WITH UNIFORM SLOPES BETWEENPOINTS WHERE ELEVATIONS ARE SHOWN OR BETWEEN SUCH POINTS ANDEXISTING GRADES.8.SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS &GUTTER FLOW LINE UNLESS OTHERWISE NOTED. PROPOSED CONTOURS ARETO FINISHED SURFACE GRADE.9.SEE SOILS REPORT FOR PAVEMENT THICKNESSES AND HOLD DOWNS.10.CONTRACTOR SHALL DISPOSE OF ANY EXCESS SOIL MATERIAL THAT EXISTSAFTER THE SITE GRADING AND UTILITY CONSTRUCTION IS COMPLETED. THECONTRACTOR SHALL DISPOSE OF ALL EXCESS SOIL MATERIAL IN A MANNERACCEPTABLE TO THE OWNER AND THE REGULATING AGENCIES.11.CONTRACTOR SHALL PROVIDE A STRUCTURAL RETAINING WALL DESIGNCERTIFIED BY A LICENSED PROFESSIONAL ENGINEER.12.ALL CONSTRUCTION SHALL CONFORM TO LOCAL, STATE AND FEDERAL RULESINCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM(NPDES) PERMIT REQUIREMENTS.13.PRIOR TO PLACEMENT OF ANY STRUCTURE OR PAVEMENT, A PROOF ROLL, ATMINIMUM, WILL BE REQUIRED ON THE SUBGRADE. PROOF ROLLING SHALL BEACCOMPLISHED BY MAKING MINIMUM OF 2 COMPLETE PASSES WITHFULLY-LOADED TANDEM-AXLE DUMP TRUCK, OR APPROVED EQUAL, IN EACH OF2 PERPENDICULAR DIRECTIONS WHILE UNDER SUPERVISION AND DIRECTION OFTHE INDEPENDENT TESTING LABORATORY. AREAS OF FAILURE SHALL BEEXCAVATED AND RE-COMPACTED AS SPECIFIED HEREIN.14.EMBANKMENT MATERIAL PLACED BENEATH BUILDINGS AND STREET OR PARKINGAREAS SHALL BE COMPACTED IN ACCORDANCE WITH THE SPECIFIED DENSITYMETHOD AS OUTLINED IN MNDOT 2105.3F1 AND THE REQUIREMENTS OF THEGEOTECHNICAL ENGINEER.15.EMBANKMENT MATERIAL NOT PLACED IN THE BUILDING PAD, STREETS ORPARKING AREA, SHALL BE COMPACTED IN ACCORDANCE WITH REQUIREMENTSOF THEORDINARY COMPACTION METHOD AS OUTLINED IN MNDOT 2105.3F2.16.ALL SOILS AND MATERIALS TESTING SHALL BE COMPLETED BY AN INDEPENDENTGEOTECHNICAL ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVINGUNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THEGEOTECHNICAL ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FORCOORDINATING ALL REQUIRED SOILS TESTS AND INSPECTIONS WITH THEGEOTECHNICAL ENGINEER.SCALE IN FEET06030PROPERTY BOUNDARYEXISTING CONTOURPROPOSED CONTOURSETBACK LINERIGHT OF WAY LINEEASEMENTSTANDARD CURB AND GUTTERSTORM SEWERFLARED END SECTIONRETAINING WALLDRAINTILEGRADING LIMITSSPOT ELEVATIONFLOW DIRECTIONEMERGENCY OVERFLOWGRADE BREAKLODD-1.50%1000.00E.O.SPOT ELEV. LABELSM.E.=MATCH EXISTINGTW=TOP OF WALLBW=BOTTOM OF WALLTC=TOP OF CURB14 ||||||||||||||||||||||||||||||||||||||||UEUEUEUEUEUEUEUEUEUEUEUEUE UE UE UEUE UE UE UE UEUEUEUE UE UE UE UE U E UE15" RCP 12" RCP12" RCP 15" PVC15" RCP 24" RCP8" VCP (PER PLAN)2 STORY FRAME & STUCCO MULTI-UNIT BUILDINGAREA = 9103 SFBLDG #611BLDG #6211 Story Frame & Stucco Garage ComplexArea = 4630 SFCOVERED ENTRYCOVERED ENTRYCOVERED ENTRYCOVERED ENTRYCOVERED ENTRYCANTILEVERW O O D SH E D SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEPID: 257620020OWNER: SANTA VERA APARTMENTS LLC1' BLOCKRET. WALL1' BLOCKRET. WALL1' BLOCKRET. WALL1' BLOCKRET. WALL10 10101010101010101010 10 101010ROOF OVERHANGROOF OVERHANG12" RCP15 " R C P 21" RCP12" PVC1 8 " P V C 8" PVC (PER PLAN) 8" DIP (PER PLAN)6" DIP (PER PLAN)8" DIP (PER PLAN) 8" PVC (PER PLAN)8" CIP (PER PLAN)8" ABS (PER PLAN)DELRIODRIVE21" RCPROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)CONCRETE STAIRSW/ HANDRAILWOOD MULCHCONCRETE STAIRSW/ HANDRAILROCK MULCH (TYP.)ROCK MULCH (TYP.)Drainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONCBRE=990.37INV=987.37 NEINV=987.35 SCBRE=990.62CBRE=990.39INV=990.39 NINV=987.36 WCBRE=988.64INV=982.90 NINV=982.87 SINV=984.64 SWCBRE=987.59INV=981.39 NINV=981.43 SINV=983.02 WCBRE=987.33CBRE=987.77INV=981.35 NINV=981.31 SCBRE=987.74INV=981.12 EINV=981.15 SSTSTMHRE=988.19INV=980.55 WINV=? NE/SESUMP=974.87WEIR=982.93NOTCH=980.59STSTMHRE=988.01STSTMHRE=988.04H YDSSMHRE=988.50INV=975.88 WINV=975.85 ERE=994.17INV=991.53 SWINV=990.37 EINV=990.35 WSSMHRE=995.24CBRE=995.23INV=990.75 ECBRE=994.83CBRE=995.60CBRE=995.72INV=992.08 NEINV=991.88 SWCBRE=996.29INV=992.59 NEINV=992.85 SWAREA : 167713.25 SF3.85 ACRES8.00N16°56'27"EL=137.87meas.(137.88plat)R=474.00Δ=16°39'56"meas.(16°40'00"plat)N89°43'33"W 78.00N00°16'27"E 513.79N89°11'28"W 174.96N53°31'23"W 254.72N00°20'03"E 252.00 L=219.05R=171.00Δ=73°23'36"47.222.546.222.1 46.222 . 2 70.516 . 1 23.514 . 2 16.522 . 517.214 . 1 23.516 . 1 68.822 . 2 46.222.11.024 . 0 31.81. 0 8.61. 0 43.24. 0 24.040 . 6 83.624.0 83.04. 0 24.08.631.842.61.048.6WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.60|||||||||||||HYD D| |2 STORYMULTIFAMILY12 UNITSFFE: 995.00GFE: 994.832 STORYMULTIFAMILY16 UNITSFFE: 996.00GFE: 995.83SSHYD DDSTORMWATER RETENTION(NURP) BASINS±44,590 C.F. COMBINEDTOTAL LIVE STORAGE±8,590 C.F. COMBINEDTOTAL DEAD STORAGETOP BERM: 993.00E.O. SPILLWAY: 992.50HWL: 992.06WQVE: 990.40NWL: 988.30RE-USE SHUTOFF: 987.00BOTTOM: 984.00DLODLODLODLODLOD LODLODLODLODLODLODLOD LODLODLODLOD LODL O D LODLODLODLODLODLODLODLODLOD LOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLOD LOD LOD LOD LOD LOD LOD 6" C900 WATERMAIN6" -22.5° BEND4" C900 FIRESERVICE COORD. W/ MEP6"X6" TEEHYDRANT &6" GATE VALVERE-USE SALVAGEDHYDRANTCONNECT TO EXISTING6" SERVICE PER CITY STANDARDSHYDRANT &6" GATE VALVE2" COPPER DOMESTICSERVICE COORD. W/ MEP6" x 6" TEE4" x 6" TEE4" GATE VALVE2" CORP. STOP2" CORP. STOP6" -22.5° BEND6" TO 4" REDUCER4" C900 FIRESERVICE COORD. W/ MEP2" COPPER DOMESTICSERVICE COORD. W/ MEP4" SANITARY SERVICECOORD. W/ MEPIE=984.08SAN MH-1CONSTRUCT MANHOLE TOCONNECT TO EXISTING LINERIM: 993.50IE=979.70 (W)IE=979.60 (E) - EXISTINGCONTRACTOR TO VERIFY EX.ELEVATION PRIOR TO CONNECTIONAND CONTACT ENGINEER W/ ANYDISCREPANCIES PRIOR TOCONSTRUCTION4" SANITARY SERVICECOORD. W/ MEPIE=985.3842 LF -4" PVC @ 2%107 LF -4" PVC @ 2%SAN MH-2RIM: 993.90IE=983.24 (W)IE=983.24 (S)IE=983.14 (E)12376 LF -4" PVC @ 4.5%3/4" BACKUP SUPPLY LINE FOR IRRIGATION SYSTEMCOORD. W/ IRRIGATION DESIGNERDescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\UTILITY PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C5.0UTILITY PLANLEGENDUTILITY NOTES1.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OFEXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE VARIOUSUTILITY COMPANIES AND LIMITED MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION SHALLNOT BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY EXISTINGCONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OR ENGINEER OFDISCREPANCIES.2.ALL SANITARY SEWER, STORM SEWER AND WATER MAIN MATERIAL AND INSTALLATIONS SHALL BEPER CITY REQUIREMENTS, MINNESOTA PLUMBING CODE, AND IN ACCORDANCE WITH THECURRENT EDITION OF THE STANDARD UTILITIES SPECIFICATION AS PREPARED BY THE CITYENGINEERS ASSOCIATION OF MINNESOTA (CEAM).3.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN THE NECESSARY FEDERAL, STATEAND LOCAL PERMITS FOR THE PROPOSED WORK OR VERIFY WITH THE OWNER OR ENGINEER THATPERMITS HAVE BEEN OBTAINED. PERMIT FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTORUNLESS OTHERWISE ARRANGED WITH THE OWNER.4.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND DIMENSIONSOF DOORWAYS, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS, AND EXACT BUILDINGUTILITY CONNECTION LOCATIONS.5.ALL PRIVATE UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFICATIONS OFTHE APPROPRIATE UTILITY COMPANY. THE CONTRACTOR SHALL COORDINATE THE SERVICE LINECONSTRUCTION WITH THE UTILITY COMPANIES.6.CONTRACTOR SHALL OBTAIN ALL NECESSARY CITY PERMITS FOR UTILITY CONNECTIONS ANDUTILITIES SHALL BE INSPECTED AND APPROVED BY THE CITY. THE CITY SHALL BE NOTIFIED48-HOURS PRIOR TO COMMENCING WITH THE UTILITY CONSTRUCTION OR ANY REQUIREDTESTING. CONTRACTOR SHALL NOT OPERATE, INTERFERE WITH, CONNECT ANY PIPE OR HOSE TO,OR TAP ANY WATER MAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THECITY. ANY ADVERSE CONSEQUENCES OF SCHEDULED OR UNSCHEDULED DISRUPTIONS OFSERVICE TO THE PUBLIC ARE TO BE THE RESPONSIBILITY OF THE CONTRACTOR.7.PROVIDE WATER MAIN THRUST RESTRAINTS PER CITY STANDARD REQUIREMENTS.8.PER MINNESOTA DEPARTMENT OF LABOR & INDUSTRY REQUIREMENTS, A MINIMUM OF 18 INCHESOF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION IS REQUIRED FROMWATERMAIN TO ANY MANHOLE, SEPTIC SYSTEM, CATCH BASIN, SEWER PIPE, OR OTHER SOURCEOF CONTAMINATION, MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OFTHE CONTAMINATION SOURCE UNLESS OTHERWISE SHOWN.9.UTILITY SERVICES TYPICALLY TERMINATE 5' OUTSIDE BUILDING WALL UNLESS OTHERWISE SHOWNOR NOTED.10.WATERMAIN PIPE SHALL EITHER BE AWWA C900 PVC WITH DUCTILE IRON FITTINGS AND RISERS,OR DIP CLASS 52.11.ALL WATER LINES SHALL HAVE 8' MINIMUM COVER (TOP OF PIPE TO FINISH GRADE). INSULATEWATER MAIN IF LESS THAN 8' OF COVER. INSULATION SHALL BE DOW STYROFOAM HI BRAND 35OR EQUIVALENT, WITH 4 INCHES OF THICKNESS.12.SANITARY SEWER PIPE OUTSIDE THE BUILDING ENVELOPE THAT IS 8" OR GREATER SHALL BEPOLYVINYL CHLORIDE (PVC) SDR 26. SCHEDULE 40 MUST BE USED IS THE PIPE IS 6" OR SMALLER.C900 IS REQUIRED FOR DEPTHS GREATER THAN 20 FEET. SANITARY SEWER PIPE WITHIN 5 FEET OFTHE BUILDING AND UNDER FOOTINGS SHALL BE SCHEDULE 40 PER ASTM D2665. ALL PLASTICSANITARY SEWER SHALL BE INSTALLED PER D2321. SOLVENT WELD JOINTS MUST INCLUDE USE OFA PRIMER WHICH IS OF A CONTRASTING COLOR TO THE PIPE AND CEMENT. ALL SANITARY SEWERSHALL BE TESTED COMPLIANT TO CURRENT MINNESOTA PLUMBING CODE.13.STORM SEWER PIPE:13.1.HDPE OR POLYPROPYLENE PIPE MAY BE INSTALLED WITH APPROVAL OF LOCAL GOVERNINGAGENCIES.13.2.HDPE STORM PIPE 4- TO 60-INCHES IN DIAMETER SHALL MEET REQUIREMENTS OF ASTMF2648. FITTINGS SHALL BE PER ASTM F2306 AND INSTALLED PER ASTM D2321.13.3.POLYPROPYLENE STORM PIPE 12- TO 60-INCHES IN DIAMETER SHALL MEET REQUIREMENTS OFASTM F2881. APPROVED FITTINGS SHALL MEET JOINT PERFORMANCE REQUIREMENTS OFASTM D3212. AT PIPE JOINTS, THE SPIGOT SHALL UTILIZE TWO GASKETS MEETING THEREQUIREMENTS OF ASTM F477. INSTALL IN ACCORDANCE WITH ASTM D2321.13.4.PVC STORM SEWER PIPE AND FITTINGS SHALL BE SCHEDULE 40 PIPE PER ASTM D2665 ANDINSTALLED PER ASTM D2321.13.5.IF REQUIRED BY AHJ, REINFORCED CONCRETE PIPE SHALL BE CLASS 5 FOR PIPE DIAMETERS 18"AND SMALLER AND CLASS 3 FOR PIPE DIAMETERS 21" AND LARGER UNLESS OTHERWISENOTED, PER ASTM C76 WITH R-4 GASKETS.14.ALL PORTIONS OF SANITARY & STORM SEWER SYSTEMS, INCLUDING STRUCTURES, LOCATEDWITHIN 10-FEET OF A BUILDING AND/OR WATER LINE SHALL BE TESTED IN ACCORDANCE WITHMINNESOTA RULES, PART 4714 AND CURRENT MINNESOTA PLUMBING CODE.PROPOSEDPROPERTY BOUNDARYEASEMENTCURB AND GUTTERWATER MAINHYDRANTGATE VALVESANITARY SEWERSTORM SEWERFLARED END SECTION W/ RIP RAP & TRASH GUARDDRAINTILERETAINING WALLGASUNDERGROUND ELECTRICOVERHEAD ELECTRICTELEPHONE/FIBERLIGHT POLE|||GGUEUTSCALE IN FEET06030SUTILITY CROSSING TABLECROSSING #UPPER UTILITYBOTTOM OF PIPELOWER UTILITYTOP OF PIPE1STORM IE= 988.62WATER TOP = 985.302STORM IE= 988.57SAN. TOP = 979.703WATER IE = 985.50SAN. TOP = 984.00DOE15 |||||||||||||||||||||||||||||||||||||UEUEUEUEUEUEUEUEUEUEUEUEUE UE UE UEUE UE UE UE UEUEUEUE UE UE UE UE U E UE15" RCP 12" RCP12" RCP 15" PVC15" RCP 24" RCP8" VCP (PER PLAN)2 STORY FRAME & STUCCO MULTI-UNIT BUILDINGAREA = 9103 SFBLDG #611BLDG #6211 Story Frame & Stucco Garage ComplexArea = 4630 SFCOVERED ENTRYCOVERED ENTRYCOVERED ENTRYCOVERED ENTRYCOVERED ENTRYCANTILEVERW O O D SH E D SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEPID: 257620020OWNER: SANTA VERA APARTMENTS LLC1' BLOCKRET. WALL1' BLOCKRET. WALL1' BLOCKRET. WALL1' BLOCKRET. WALL10 10101010101010101010 10 101010ROOF OVERHANGROOF OVERHANG12" RCP15 " R C P 21" RCP12" PVC1 8 " P V C 8" PVC (PER PLAN)8" DIP (PER PLAN) 8" PVC (PER PLAN)8" CIP (PER PLAN)DELRIODRIVE21" RCPROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)CONCRETE STAIRSW/ HANDRAILWOOD MULCHCONCRETE STAIRSW/ HANDRAILROCK MULCH (TYP.)ROCK MULCH (TYP.)Drainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONINV=987.35 SINV=987.36 WCBRE=988.64INV=982.90 NINV=982.87 SINV=984.64 SWCBRE=987.59INV=981.39 NINV=981.43 SINV=983.02 WCBRE=987.33CBRE=987.77INV=981.35 NINV=981.31 SCBRE=987.74INV=981.12 EINV=981.15 SSTSTMHRE=988.19INV=980.55 WINV=? NE/SESUMP=974.87WEIR=982.93NOTCH=980.59STSTMHRE=988.01STSTMHRE=988.04H YDSSMHRE=988.50INV=975.88 WINV=975.85 ECBRE=995.23INV=990.75 ECBRE=994.83CBRE=995.60CBRE=995.72INV=992.08 NEINV=991.88 SWCBRE=996.29INV=992.59 NEINV=992.85 SWAREA : 167713.25 SF3.85 ACRES8.00N16°56'27"EL=137.87meas.(137.88plat)R=474.00Δ=16°39'56"meas.(16°40'00"plat)N89°43'33"W 78.00N00°16'27"E 513.79N89°11'28"W 174.96N53°31'23"W 254.72N00°20'03"E 252.00 L=219.05R=171.00Δ=73°23'36"47.222.546.222.1 46.222 . 2 70.516 . 1 23.514 . 2 16.522 . 517.214 . 1 23.516 . 1 68.822 . 2 46.222.11.024 . 0 31.81. 0 8.61. 0 43.24. 0 24.040 . 6 83.624.0 83.04. 0 24.08.631.842.61.048.6WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.60|||||||||||||HYD D| |2 STORYMULTIFAMILY12 UNITSFFE: 995.00GFE: 994.832 STORYMULTIFAMILY16 UNITSFFE: 996.00GFE: 995.83SSHYD DDSTORMWATER RETENTION(NURP) BASINS±44,590 C.F. COMBINEDTOTAL LIVE STORAGE±8,590 C.F. COMBINEDTOTAL DEAD STORAGETOP BERM: 993.00E.O. SPILLWAY: 992.50HWL: 992.06WQVE: 990.40NWL: 988.30RE-USE SHUTOFF: 987.00BOTTOM: 984.00DLODLODLODLODLOD LODLODLODLODLODLODLOD LODLODLODLOD LODL O D LODLODLODLODLODLODLODLODLOD LOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLOD LOD LOD LOD LOD LOD LOD 30 LF - 15" RCP @ 1.00%DRAIN BASIN-301RIM: 991.00INV(N): 988.50INV(S): 988.50SUMP: 986.50OCS-100LOW RIM: 992.50TOP WEIR: 991.20R.C. ORIFICE: 990.40R.C. ORIFICE: 988.30INV(W): 988.30INV(N): 987.30FES-100INV: 988.30DRAIN BASIN-102RIM: 993.50INV(N): 990.82INV(NW): 988.96INV(E): 988.9630 LF - 24" HDPE @ 0.33%DRAIN BASIN-101RIM: 993.60INV(W): 988.63INV(E): 988.63SUMP: 986.63DRAIN BASIN-111RIM: 994.90INV(SE): 991.90INV(SW): 991.86SUMP: 989.8658 LF - 18" HDPE@ 0.56%78 LF - 15" HDPE@ 0.56%85 LF - 18" HDPE @ 0.56%82 LF - 15" HDPE @ 0.56%25 LF - 15" HDPE @ 0.56%50 LF - 15" HDPE @ 0.56%50 LF - 15" HDPE @ 0.56%50 LF - 15" HDPE @ 0.56%40 LF - 15" HDPE @ 0.56%60 LF - 12" HDPE @ 0.56%36 LF - 12" HDPE@ 0.56%DRAIN BASIN-103RIM: 993.50INV(N): 990.50INV(NW): 989.43INV(SE): 989.43DRAIN BASIN-104RIM: 995.30INV(NE): 990.20INV(NW): 989.87INV(SE): 989.87DRAIN BASIN-105RIM: 995.00INV(N): 990.33INV(SE): 990.33INLINE DRAIN-106RIM: 994.50INV(E): 991.82INV(N): 990.47INV(S): 990.47DRAIN BASIN-110RIM: 997.50INV(SE): 991.75INV(NE): 991.53INV(S): 991.53DRAIN BASIN-104ARIM: 993.90INV(SW):990.40SUMP:988.40INLINE DRAIN-107RIM: 994.50INV(NE): 991.70INV(N): 990.75INV(S): 990.75INLINE DRAIN-108RIM: 994.50INV(NE): 991.67INV(N): 991.03INV(S): 991.03INLINE DRAIN-109RIM: 994.50INV(N): 991.31INV(S): 991.31DRAIN BASIN-112RIM: 994.90INV(NW): 992.20SUMP: 990.2060 LF - 12" HDPE @ 0.56%93 LF - 24" HDPE@ 0.32%DRAIN BASIN-200RIM: 993.00INV(N): 988.70INV(SW): 988.70SUMP: 986.7080 LF - 24" HDPE @ 0.50%FES-200INV: 988.30FES-300INV: 988.3095 LF - 18" HDPE @ 0.21%STMH-100RIM: 990.50INV(S): 987.00INV(E): 983.20CONTRACTOR TO VERIFY EX. ELEV. PRIORTO CONNECTION AND CONTACTENGINEER W/ ANY DISCREPANCIES PRIORTO CONSTRUCTIONREPLACE EXISTING 12" STUBW/ 20 LF - 15" RCP @ 1.00%ROOF DRAIN (TYP.)INV: 992.0033 LF - 6" PVC @ 1.00%6" PVC WYE15 LF - 6" PVC @ 1.00%25 LF - 6" PVC @ 1.00%SPLASH BLOCKSPLASH BLOCKSPLASH BLOCK30 LF - 6" PVC @ 1.00%16 LF - 6" PVC@ 1.00%6" PVC WYE18 LF - 6" PVC @ 1.00%ROOF DRAIN (TYP.)INV: 991.006" PVC WYE40 LF - 6" PVC@ 1.25%10 LF - 6" PVC@ 1.67%50 LF - 6" PVC@ 1.00%75 LF - 8" HDPE @ 1.00%54 LF - 8" HDPE @ 1.00%40 LF - 8" HDPE @ 1.00%18 LF - 6" PVC@ 1.00%FES-100AINV: 988.00INLINE DRAIN-302RIM: 992.00INV(N): 988.90INV(S): 988.90INLINE DRAIN-303RIM: 994.00INV(W): 989.44INV(S): 989.44NEW GUTTER DOWNSPOUTCONNECTION (TYP. OF 3)14 LF - 15" RCP@ -2.14%STORMWATERREUSEIRRIGATIONPUMP STATION24 LF - 18" HDPE @ 0.56%INLINE DRAIN-304RIM: 995.50INV: 990.20DRAIN BASIN-100RIM: 993.30INV(SW): 988.50INV(N):988.40INV(SE):988.40SUMP: 986.40|||GGUEUTSCALE IN FEET06030SDescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\UTILITY PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C5.1STORM SEWER PLANLEGENDPROPOSEDPROPERTY BOUNDARYEASEMENTCURB AND GUTTERWATER MAINHYDRANTGATE VALVESANITARY SEWERSTORM SEWERFLARED END SECTION W/ RIP RAP & TRASH GUARDDRAINTILERETAINING WALLGASUNDERGROUND ELECTRICOVERHEAD ELECTRICTELEPHONE/FIBERLIGHT POLEDOESTORM SEWER NOTES1.STORM SEWER PIPE:1.1.HDPE OR POLYPROPYLENE PIPE MAY BE INSTALLED WITH APPROVAL OF LOCALGOVERNING AGENCIES.1.2.HDPE STORM PIPE 4- TO 60-INCHES IN DIAMETER SHALL MEET REQUIREMENTSOF ASTM F2648. FITTINGS SHALL BE PER ASTM F2306 AND INSTALLED PERASTM D2321.1.3.POLYPROPYLENE STORM PIPE 12- TO 60-INCHES IN DIAMETER SHALL MEETREQUIREMENTS OF ASTM F2881. APPROVED FITTINGS SHALL MEET JOINTPERFORMANCE REQUIREMENTS OF ASTM D3212. AT PIPE JOINTS, THE SPIGOTSHALL UTILIZE TWO GASKETS MEETING THE REQUIREMENTS OF ASTM F477.INSTALL IN ACCORDANCE WITH ASTM D2321.1.4.PVC STORM SEWER PIPE AND FITTINGS SHALL BE SCHEDULE 40 PIPE PER ASTMD2665 AND INSTALLED PER ASTM D2321.1.5.IF REQUIRED BY AHJ, REINFORCED CONCRETE PIPE SHALL BE CLASS 5 FORPIPE DIAMETERS 18" AND SMALLER AND CLASS 3 FOR PIPE DIAMETERS 21" ANDLARGER UNLESS OTHERWISE NOTED, PER ASTM C76 WITH R-4 GASKETS.FOR GENERAL UTILITY NOTES, SEE SHEET C5.0.SEDIMENT FOREBAY2222216 |||||||||||||||||||||||||||||||||||||||||||||||||||UEUEUEUEUEUEUEUEUEUEUEUEUE UE UE UEUE UE UE UE UEUEUEUE UE UE UE UE U E UEGGGGGG G G G G GGGGGGGGGGGG GGGGGGGG606050 5050XXXXX X15" RCP 12" RCP12" RCP 15" PVC15" RCP 24" RCP8" METAL8" PVC8" METAL 8" VCP (PER PLAN)GMEMGMDeckSIGN "STOP"SIGN "STOP"SIGN "NO PARKING"SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEPID: 257620010OWNER: CHANHASSEN CITYBITUMINOUS TRAIL BITUMINOUS TRAILBITUMINOUS PARKING LOTSIGN "15MPH"4' WOODRET. WALLUNKNOWN UPSTREAMSANITARY LOCATIONTTCHAIN LINKFENCECABXSATELLITE DISHCABX10 1010101010101010 10 10 10 10101012" RCP21" RCP12" PVC1 8 " P V C 8" PVC (PER PLAN) 8" DIP (PER PLAN)6" DIP (PER PLAN)8" DIP (PER PLAN) 8" PVC (PER PLAN)8" CIP (PER PLAN)8" ABS (PER PLAN)8" ABS (PER PLAN)SAN SEWER (PER GSOC)WATER 6" DIP (PER GSOC & PLAN)50 DELRIODRIVE5021" RCPPORTABLESHEDCABXROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)WOODBENCHESFIRE PITWOOD MULCHCONCRETESTAIRSROCK MULCH (TYP.)ROCK MULCH (TYP.)GRAVEL LOTNO PARKINGDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONCBRE=990.37INV=987.37 NEINV=987.35 SCBRE=990.62CBRE=990.39INV=990.39 NINV=987.36 WCBRE=988.64INV=982.90 NINV=982.87 SINV=984.64 SWCBRE=987.59INV=981.39 NINV=981.43 SINV=983.02 WCBRE=987.33CBRE=987.77INV=981.35 NINV=981.31 SCBRE=987.74INV=981.12 EINV=981.15 SSTSTMHRE=988.19INV=980.55 WINV=? NE/SESUMP=974.87WEIR=982.93NOTCH=980.59STSTMHRE=988.01STSTMHRE=988.04H YDSSSSMHRE=988.50INV=975.88 WINV=975.85 E#111-20" ash#113-10" spruce#114-28" maple#116-60" basswood, multi-stem#117-30" maple#1-boxelder, 3-stem(8,8,8)#2-13" boxelder#5-poplar, 2-stem(15,13)#3-boxelder, 3-stem(8,8,4)#6-poplar, 4-stem(20,20,20,10)#8-13" poplar#22-poplar, 2-stem(20,16)#23-poplar, 2-stem(24,12)#24-poplar, 2-stem(20,20)#25-poplar, 2-stem(10,6)#110-16" pine#109-30" maple#108-22" maple#107-26" maple#106-14" pine#4-boxelder, 4-stem(10,8,6,5)#12-10" boxelder#112-22 maple#105-22" pine#104-15" pine#102-14" pine#101-15" ash#100-14" ash#98-20" spruce#99-18" maple#103-16" pine#97-15" spruce#96-20" mapleCBRE=994.17INV=991.53 SWINV=990.37 EINV=990.35 WSSSSMHRE=995.24CBRE=995.23INV=990.75 ECBRE=994.83CBRE=995.60HHCBRE=995.72INV=992.08 NEINV=991.88 SWCBRE=996.29INV=992.59 NEINV=992.85 SW#86-50" cottonwood#85-20" cottonwood#84-16" boxelder#83-14" boxelder#81-11" boxelder#82-20" crabapple#87-12" maple#88-ash, 2-stem(8,8)#89-22" maple#90 15" maple#91-16" maple#95-48" maple#94-18" maple#93-15" maple#92-15" maple#131-10" red cedar#133-12" cottonwood#132-10" red cedar#79-15" crabapple#80-12" crabapple#78-boxelder, 4-stem(8,8,6,6)#126-11" cottonwood#125-10" elm#124-10" red cedar#123-14" cottonwood#122-10 cottonwood#121-30" cottonwood#120-18" cottonwood#119-10" cottonwood#118-28" maple#26-poplar, 3-stem(20,14,14)#27-20" poplar#28-24" poplar#29-14" poplar#33-11" poplar#32-20" poplar#30-30" poplar#31-poplar, 2-stem(14,14)#7-18" poplar#9-boxelder, 2-stem(10,8)#10-poplar, 2-stem(42,13)#11-35' spruce#16-20" poplar#14-11" boxelder#13-60" cottonwood#15-11" boxelder#20-10" boxelder#19-26" poplar#18-24" poplar#17-24" poplar#37-10" boxelder#35-10" boxelder#36-10" boxelder#34-10" boxelderHYD TNH996.69CSSSSSMHRE=993.60INV=983.83 NEINV=983.86 SW (ORIFICE, NO PIPE)SSSSMHRE=994.50INV=982.01 SWINV=982.60 NWINV=982.08 E#48-10" boxelder#41-10" boxelder#21-boxelder, 3-stem(10,10,10)#38-10" boxelder#39-36" poplar#40-36" poplar#42-10" boxelder#43-14" boxelder#44-16" boxelder#51-11" boxelder#52-10" boxelder#53-12" boxelder#54-11" boxelder#55-10" ash#45-11" boxelder#47-14" boxelder#46-10" boxelder#49-11" boxelder#50-silver maple, 5-stem(12,12,9,6,4)#59-10" maple#60-silver maple, 4-stem(18,16,10,8)#70-26" silver maple#58-10 ash#56-10" ash#57-10" ash#61-basswood, 4-stem(8,8,6,4)#63-12" crabapple#62-10" boxelder#64-14" ash#65-10" ash#66-10" ash#67-12" ash#74-10" boxelder#73-14" boxelder#68-silver maple, 3-stem(8,5,4)#69-16" silver maple#71-15" maple#72-15" maple#75-12" elm#76-14" ashGM#127-12" cottonwood#128-cottonwood, 2-stem(10,8)#129-10" maple#130-15" cottonwood#77-15' red cedar8.00N16°56'27"EL=137.87meas.(137.88plat)R=474.00Δ=16°39'56"meas.(16°40'00"plat)N89°43'33"W 78.00N00°16'27"E 513.79N89°11'28"W 174.96N53°31'23"W 254.72N00°20'03"E 252.00 L=219.05R=171.00Δ=73°23'36"1005.91005.51005.71005.81001.61001.41001.61001.81001.01001.61001.0998.4998.8999.1999.2999.1998.9998.7998.7 997.8995.6997.2995.0994.6995.2993.4993.2993.1993.5993.8992 . 6 994.4995.7999.0996.9995.8997.0995.3995.699 5 . 7 9 9 4 . 4 994.2993.2992.3993.7994.8995.3995.8996.1995.8996.0995.6994.7994.8994.4993.5993.7991.8992.5994.8995.9992.2991.4993.8996.7997.8997.4995.3997.9995.7991.1991.7993.9995.2995.5996.2996.6997.2997.41000.71001.61003.21002.41001.9996.5995.7993.5992.7992.5991.1991.2990.8990.4993.1991.3990.2989.2990.8990.7990.3990.79 9 2 . 5 993.8991.8989. 4 989.3989.2989.0988.6988.7990.2991.4991.4992.0992.5989.4990.3990.7999.2998.7998.59 9 8 . 5 1001.7 992.6992.8 99 0 991 99 2 993 994 99299399499399499599699 2 9939 9 0 99 1 99 2 99 3991992 996 997 998 999 1000 99899910001001100110021002100310031004100410051005 99699799899910001001992 993994995991 9 9 2 9 9 3 991 992 993 991 992 99 3 995 991991991992993994995996997991990 991 992 993 994 990 989 989 996 996989 989 988 9 9 5 99 6 997 998999 10001001100210031004100599910001001100210039929 9 3 9 9 4 995 99 6 99 7 9 9 8 9 9 7 994992995996994993995WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.60LODLODLODLODLOD LODLODL O D LODLODLOD LODLODLODLODLOD LODL O D LODLODLODLODLODLODLODLODLOD LOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLOD LOD LOD LOD LOD LOD LOD|||||||||||||||||||||||||||||||||||||||||||||||||||UEUEUEUEUEUEUEUEUEUEUEUEUE UE UE UEUE UE UE UE UEUEUEUE UE UE UE UE U E UEGGGGGG G G G G GGGGGGGGGGGG GGGGGGGG606050 5050XXXXX X15" RCP 12" RCP12" RCP 15" PVC15" RCP 24" RCP8" METAL8" PVC8" METAL 8" VCP (PER PLAN)GMEMGMDeckSIGN "STOP"SIGN "STOP"SIGN "NO PARKING"SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEPID: 257620010OWNER: CHANHASSEN CITYBITUMINOUS TRAIL BITUMINOUS TRAILBITUMINOUS PARKING LOTSIGN "15MPH"4' WOODRET. WALLUNKNOWN UPSTREAMSANITARY LOCATIONTTCHAIN LINKFENCECABXSATELLITE DISHCABX10 1010101010101010 10 10 10 10101012" RCP21" RCP12" PVC1 8 " P V C 8" PVC (PER PLAN) 8" DIP (PER PLAN)6" DIP (PER PLAN)8" DIP (PER PLAN) 8" PVC (PER PLAN)8" CIP (PER PLAN)8" ABS (PER PLAN)8" ABS (PER PLAN)SAN SEWER (PER GSOC)WATER 6" DIP (PER GSOC & PLAN)50 DELRIODRIVE5021" RCPPORTABLESHEDCABXROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)WOODBENCHESFIRE PITWOOD MULCHCONCRETESTAIRSROCK MULCH (TYP.)ROCK MULCH (TYP.)GRAVEL LOTNO PARKINGDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONCBRE=990.37INV=987.37 NEINV=987.35 SCBRE=990.62CBRE=990.39INV=990.39 NINV=987.36 WCBRE=988.64INV=982.90 NINV=982.87 SINV=984.64 SWCBRE=987.59INV=981.39 NINV=981.43 SINV=983.02 WCBRE=987.33CBRE=987.77INV=981.35 NINV=981.31 SCBRE=987.74INV=981.12 EINV=981.15 SSTSTMHRE=988.19INV=980.55 WINV=? NE/SESUMP=974.87WEIR=982.93NOTCH=980.59STSTMHRE=988.01STSTMHRE=988.04H YDSSSSMHRE=988.50INV=975.88 WINV=975.85 E#111-20" ash#113-10" spruce#114-28" maple#116-60" basswood, multi-stem#117-30" maple#1-boxelder, 3-stem(8,8,8)#2-13" boxelder#5-poplar, 2-stem(15,13)#3-boxelder, 3-stem(8,8,4)#6-poplar, 4-stem(20,20,20,10)#8-13" poplar#22-poplar, 2-stem(20,16)#23-poplar, 2-stem(24,12)#24-poplar, 2-stem(20,20)#25-poplar, 2-stem(10,6)#110-16" pine#109-30" maple#108-22" maple#107-26" maple#106-14" pine#4-boxelder, 4-stem(10,8,6,5)#12-10" boxelder#112-22 maple#105-22" pine#104-15" pine#102-14" pine#101-15" ash#100-14" ash#98-20" spruce#99-18" maple#103-16" pine#97-15" spruce#96-20" mapleCBRE=994.17INV=991.53 SWINV=990.37 EINV=990.35 WSSSSMHRE=995.24CBRE=995.23INV=990.75 ECBRE=994.83CBRE=995.60HHCBRE=995.72INV=992.08 NEINV=991.88 SWCBRE=996.29INV=992.59 NEINV=992.85 SW#86-50" cottonwood#85-20" cottonwood#84-16" boxelder#83-14" boxelder#81-11" boxelder#82-20" crabapple#87-12" maple#88-ash, 2-stem(8,8)#89-22" maple#90 15" maple#91-16" maple#95-48" maple#94-18" maple#93-15" maple#92-15" maple#131-10" red cedar#133-12" cottonwood#132-10" red cedar#79-15" crabapple#80-12" crabapple#78-boxelder, 4-stem(8,8,6,6)#126-11" cottonwood#125-10" elm#124-10" red cedar#123-14" cottonwood#122-10 cottonwood#121-30" cottonwood#120-18" cottonwood#119-10" cottonwood#118-28" maple#26-poplar, 3-stem(20,14,14)#27-20" poplar#28-24" poplar#29-14" poplar#33-11" poplar#32-20" poplar#30-30" poplar#31-poplar, 2-stem(14,14)#7-18" poplar#9-boxelder, 2-stem(10,8)#10-poplar, 2-stem(42,13)#11-35' spruce#16-20" poplar#14-11" boxelder#13-60" cottonwood#15-11" boxelder#20-10" boxelder#19-26" poplar#18-24" poplar#17-24" poplar#37-10" boxelder#35-10" boxelder#36-10" boxelder#34-10" boxelderHYD TNH996.69CSSSSSMHRE=993.60INV=983.83 NEINV=983.86 SW (ORIFICE, NO PIPE)SSSSMHRE=994.50INV=982.01 SWINV=982.60 NWINV=982.08 E#48-10" boxelder#41-10" boxelder#21-boxelder, 3-stem(10,10,10)#38-10" boxelder#39-36" poplar#40-36" poplar#42-10" boxelder#43-14" boxelder#44-16" boxelder#51-11" boxelder#52-10" boxelder#53-12" boxelder#54-11" boxelder#55-10" ash#45-11" boxelder#47-14" boxelder#46-10" boxelder#49-11" boxelder#50-silver maple, 5-stem(12,12,9,6,4)#59-10" maple#60-silver maple, 4-stem(18,16,10,8)#70-26" silver maple#58-10 ash#56-10" ash#57-10" ash#61-basswood, 4-stem(8,8,6,4)#63-12" crabapple#62-10" boxelder#64-14" ash#65-10" ash#66-10" ash#67-12" ash#74-10" boxelder#73-14" boxelder#68-silver maple, 3-stem(8,5,4)#69-16" silver maple#71-15" maple#72-15" maple#75-12" elm#76-14" ashGM#127-12" cottonwood#128-cottonwood, 2-stem(10,8)#129-10" maple#130-15" cottonwood#77-15' red cedar8.00N16°56'27"EL=137.87meas.(137.88plat)R=474.00Δ=16°39'56"meas.(16°40'00"plat)N89°43'33"W 78.00N00°16'27"E 513.79N89°11'28"W 174.96N53°31'23"W 254.72N00°20'03"E 252.00 L=219.05R=171.00Δ=73°23'36"1005.91005.51005.71005.81001.61001.41001.61001.81001.01001.61001.0998.4998.8999.1999.2999.1998.9998.7998.7 997.8995.6997.2995.0994.6995.2993.4993.2993.1993.5993.8992 . 6 994.4995.7999.0996.9995.8997.0995.3995.699 5 . 7 9 9 4 . 4 994.2993.2992.3993.7994.8995.3995.8996.1995.8996.0995.6994.7994.8994.4993.5993.7991.8992.5994.8995.9992.2991.4993.8996.7997.8997.4995.3997.9995.7991.1991.7993.9995.2995.5996.2996.6997.2997.41000.71001.61003.21002.41001.9996.5995.7993.5992.7992.5991.1991.2990.8990.4993.1991.3990.2989.2990.8990.7990.3990.79 9 2 . 5 993.8991.8989. 4 989.3989.2989.0988.6988.7990.2991.4991.4992.0992.5989.4990.3990.7999.2998.7998.59 9 8 . 5 1001.7 992.6992.8 99 0 991 99 2 993 994 99299399499399499599699 2 993 9 9 0 99 1 99 2 99 3991992 996 997 998 999 1000 99899910001001100110021002100310031004100410051005 99699799899910001001992 993994995991 9 9 2 9 9 3 991 992 993 991 992 99 3 995 991991991992993994995996997991990 991 992 993 994 990 989 989 996 996989 989 988 9 9 5 99 6 997 998999 10001001100210031004100599910001001100210039929 9 3 9 9 4 995 99 6 99 7 9 9 8 9 9 7 994992995996994993995WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.60LODLODLODLODLOD LODLODL O D LODLODLOD LODLODLODLODLOD LODL O D LODLODLODLODLODLODLODLODLOD LOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLOD LOD LOD LOD LOD LOD LOD INSTALL SILT FENCEPER CIVIL DETAILSINSTALL SILT FENCEPER CIVIL DETAILSINSTALL SILT FENCEPER CIVIL DETAILSINSTALL SILT FENCEPER CIVIL DETAILSINSTALL ROCK ENTRANCEPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSDescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\EROSION CONTROL PLANS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalLandscape Architect under thelaws of the State of Minnesota.1RPBCWD Rev-107.21.2025Sheet:XX.XX.XX53234Joshua J McKinney, PLAN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C6.0PHASE 1EROSIONCONTROLLEGENDPROPOSEDPROPERTY BOUNDARYINDEX CONTOURINTERVAL CONTOURSETBACK LINERIGHT OF WAY LINEEASEMENTSTANDARD CURB AND GUTTERSTORM SEWERFLARED END SECTIONWATER MAINSANITARY SEWERRETAINING WALLDRAINTILEGRADING LIMITSSPOT ELEVATIONFLOW DIRECTIONEMERGENCY OVERFLOWWALL LABEL|LODSCALE IN FEET06030DEROSION CONTROL NOTES1.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/ORELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ONRECORDS OF THE VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTSTAKEN IN THE FIELD. THE INFORMATION SHALL NOT BE RELIED ON AS BEINGEXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONSPRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OR ENGINEER OFDISCREPANCIES.2.ALL SILT FENCE AND OTHER EROSION CONTROL FEATURES SHALL BE IN-PLACEPRIOR TO ANY EXCAVATION/CONSTRUCTION AND SHALL BE MAINTAINEDUNTIL VIABLE TURF OR GROUNDCOVER HAS BEEN ESTABLISHED. EXISTING SILTFENCE ON-SITE SHALL BE MAINTAINED AND OR REMOVED AND SHALL BECONSIDERED INCIDENTAL TO THE GRADING CONTRACT. IT IS OF EXTREMEIMPORTANCE TO BE AWARE OF CURRENT FIELD CONDITIONS WITH RESPECTTO EROSION CONTROL. TEMPORARY PONDING, DIKES, HAYBALES, ETC.,REQUIRED BY THE CITY SHALL BE INCIDENTAL TO THE GRADING CONTRACT.3.EROSION AND SILTATION CONTROL (ESC): THE CONTRACTOR SHALL ASSUMECOMPLETE RESPONSIBILITY FOR CONTROLLING ALL SILTATION AND EROSIONOF THE PROJECT AREA. THE CONTRACTOR SHALL USE WHATEVER MEANSNECESSARY TO CONTROL THE EROSION AND SILTATION INCLUDING BUT NOTLIMITED TO: CATCH BASIN INSERTS, CONSTRUCTION ENTRANCES, EROSIONCONTROL BLANKET, AND SILT FENCE. ESC SHALL COMMENCE WITH GRADINGAND CONTINUE THROUGHOUT THE PROJECT UNTIL ACCEPTANCE OF THEWORK BYTHE OWNER. THE CONTRACTOR'S RESPONSIBILITY INCLUDES ALLIMPLEMENTATION AS REQUIRED TO PREVENT EROSION AND THE DEPOSITINGOF SILT. THE OWNER MAY DIRECT THE CONTRACTOR'S METHODS AS DEEMEDFIT TO PROTECT PROPERTY AND IMPROVEMENTS. ANY DEPOSITION OF SILT ORMUD ON NEW OR EXISTING PAVEMENT OR IN EXISTING STORM SEWERS ORSWALES SHALL BE REMOVED AFTER EACH RAIN EVENT. AFFECTED AREAS SHALLBE CLEANED TO THE SATISFACTION OF THE OWNER, ALL AT THE EXPENSE OFTHE CONTRACTOR. ALL TEMPORARY EROSION CONTROL SHALL BE REMOVEDBY THE CONTRACTOR AFTER THE TURF IS ESTABLISHED.4.ALL STREETS DISTURBED DURING WORKING HOURS MUST BE CLEANED AT THEEND OF EACH WORKING DAY. A CONSTRUCTION ENTRANCE TO THE SITE MUSTBE PROVIDED ACCORDING TO DETAILS TO REDUCE TRACKING OF DIRT ONTOPUBLIC STREETS.5.PROPOSED PONDS SHALL BE EXCAVATED FIRST AND USED AS TEMPORARYPONDING DURING CONSTRUCTION.6.WHEN INSTALLING END-OF-LINE FLARED END SECTIONS, BRING THE SILT FENCEUP & OVER THE FLARED END SECTIONS & COVER DISTURBED AREAS WITH RIPRAP. THE UPSTREAM FLARED END SECTIONS SHALL HAVE WOOD FIBER BLANKETINSTALLED ON THE DISTURBED SOILS.7.ALL UNPAVED AREAS ALTERED DUE TO CONSTRUCTION ACTIVITIES MUST BERESTORED WITH SEED AND MULCH, SOD, EROSION CONTROL BLANKET OR BEHARD SURFACED WITHIN 2 WEEKS OF COMPLETION OF CONSTRUCTION.8.THE SITE MUST BE STABILIZED PER THE REQUIREMENTS OF THE MPCA, NPDES,MNDOT, AND CITY.A. TEMPORARY (GREATER THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 22-111AT 30.5-POUNDS PER ACRE.B. TEMPORARY (LESS THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 21-112(FALL) OR 21-111 (SPRING/SUMMER) AT 100-POUNDS PER ACREC.INFILTRATION/FILTRATION BASIN SHALL BE MNDOT SEED MIX 34-262 AT14.5-POUNDS PER ACRE.D. POND SLOPES SHALL BE MNDOT SEED MIX 33-261 AT 35-POUNDS PER ACRE.E. GENERAL SEEDING SHALL BE MNDOT SEED MIX 25-151 AT 70-POUNDS PERACRE.F. MULCH SHALL BE MNDOT TYPE 1 APPLIED AT 2-TONS PER ACRE.9.FOR AREAS WITH SLOPES OF 3:1 OR GREATER, RESTORATION WITH SOD OREROSION CONTROL BLANKET IS REQUIRED.10.ALL TEMPORARY STOCKPILES MUST HAVE SILT FENCE INSTALLED AROUNDTHEM TO TRAP SEDIMENT.11.ALL PERMANENT PONDS USED AS TEMPORARY SEDIMENT BASINS DURINGCONSTRUCTION SHALL BE DREDGED AFTER THE SITE HAS BEEN STABILIZED TORESTORE THE POND TO THE PROPOSED BOTTOM ELEVATION.12.ALL CONSTRUCTION SHALL CONFORM TO LOCAL AND STATE RULESINCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM(NPDES) PERMIT REQUIREMENTS.13.THE SITE MUST BE KEPT IN A WELL-DRAINED CONDITION AT ALL TIMES. THECONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING, OROTHER MEANS REQUIRED TO INSURE PROPER DRAINAGE DURINGCONSTRUCTION. LOW POINTS IN ROADWAYS OR BUILDING PADS MUST BEPROVIDED WITH A POSITIVE OUTFLOW.17 |||||||||||||||||||||||||||||||||||||||||UEUEUEUEUEUEUEUEUEUEUEUEUE UE UE UEUE UE UE UE UEUEUEUE UE UE UE UE U E UEGGGGGG G G G GGGG GGGGGGGGG GGGGGGGG60605050XXXXX X15" RCP 12" RCP12" RCP 15" PVC15" RCP 24" RCPGMEMGMSIGN "STOP"SIGN "STOP"SIGN "NO PARKING"SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEPID: 257620010OWNER: CHANHASSEN CITYBITUMINOUS TRAILBITUMINOUS TRAILBITUMINOUS PARKING LOTSIGN "15MPH"TTCHAIN LINKCABXCABX10 10101010101010101010 10 10101012" RCP21" RCP12" PVC1 8 " P V C 8" PVC (PER PLAN) 8" DIP (PER PLAN)6" DIP (PER PLAN)8" DIP (PER PLAN) 8" PVC (PER PLAN)8" CIP (PER PLAN)50 DELRIODRIVE5021" RCPCABXROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)WOOD MULCHCONCRETESTAIRSROCK MULCH (TYP.)ROCK MULCH (TYP.)GRAVEL LOTDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONCBRE=990.37INV=987.37 NEINV=987.35 SCBRE=990.62CBRE=990.39INV=990.39 NINV=987.36 WCBRE=988.64INV=982.90 NINV=982.87 SINV=984.64 SWCBRE=987.59INV=981.39 NINV=981.43 SINV=983.02 WCBRE=987.33CBRE=987.77INV=981.35 NINV=981.31 SCBRE=987.74INV=981.12 EINV=981.15 SSTSTMHRE=988.19INV=980.55 WINV=? NE/SESUMP=974.87WEIR=982.93NOTCH=980.59STSTMHRE=988.01STSTMHRE=988.04H YDCBRE=994.17INV=991.53 SWINV=990.37 EINV=990.35 WCBRE=995.23INV=990.75 ECBRE=994.83CBRE=995.60HHCBRE=995.72INV=992.08 NEINV=991.88 SWCBRE=996.29INV=992.59 NEINV=992.85 SWGM8.00N16°56'27"EL=137.87meas.(137.88plat)R=474.00Δ=16°39'56"meas.(16°40'00"plat)N89°43'33"W 78.00N00°16'27"E 513.79N89°11'28"W 174.96N53°31'23"W 254.72N00°20'03"E 252.00 L=219.05R=171.00Δ=73°23'36"1005.91005.51005.71005.81001.61001.41001.61001.81001.01001.61001.0998.4998.8999.1999.2999.1998.9998.7998.7997.8995.6997.2995.0994.6995.2993.4993.2993.1993.5993.899 2 . 6 994.4995.7999.0996.9995.8997.0995.3995.699 5 . 7 9 9 4 . 4 994.2993.2992.3993.7994.8995.3995.8996.1995.8996.0995.6994.7994.8994.4993.5993.7991.8992.5994.8995.9992.2991.4993.8996.7997.8997.4995.3997.9995.7991.1991.7993.9995.2995.5996.2996.6997.2997.41000.71001.61003.21002.41001.9996.5995.7993.5992.7992.5991.1991.2990.8990.4993.1991.3990.2989.2990.8990.7990.3990.79 9 2 . 5 993.8991.8989.4 989.2989.0988.6988.7990.2991.4991.4992.0992.5989.4990.3990.7999.2998.7998.5998.51001.7 992.6992.8 99 0 991 99 2 993 994992993994993994995996 99 2 9939 9 0 9 9 1 99 2 99 3991992 996 997 998 999 1000 99899910001001100110021002100310031004100410051005 99699799899910001001992 993994995991 9929 9 3 991 992 993 991 992 99 3 995 991991991992993994995996997991990 991 992 993 994 990 989 989 996996989 989 988 995 996997 998999 10001001100210031004100599910001001100210039929 9 3 9 9 4 995996997998 997 994992995996994993995WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.609 9 4 996995996996 993 99 2 99 0 987992993994994994991992993 99199298998799199299 3 996997998999989 990 991 992 993 988 990988 994998997998996997995996997 998 993990994995996997995995 994 990997999996 989993993993 991990991992993 993987 996 98799599499499 1 99399098 8 993989 991 993993 989-2.5%-2.0%-1.7%-2.0%-2.0%-2.0%-2.0%-2.0%-2.0%-2.0%-1.5%-1.5%-1.5%-2.5%-3.0%-3.0%-3.7%-2.4%-2. 0 %-7.6%-0.5%-24.9%-15.3%-1.5% -33.3%-30.0%-26 .0%-2.0%-2.0%-2.8%-2.5%-1.5%-2.0%-4.3%-2.3%-2.0%- 2 . 1% -1.6%-1.5%-1.5%-3.0%-1.5%-1.6%-24.0%-2.0%-2.0%-1.7%-33.3%-33.3%-33.3%-18 . 0 %-2.4%-1.5%99 3 992 994 996995-1.7%-2.0% -1.7%-3.5%-2.5%LODLODLODLODLOD LODLODLODLODLODLODLOD LODLODLODLOD LODL O D LODLODLODLODLODLODLODLODLOD LOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLOD LOD LOD LOD LOD LOD LOD 993 984 98 7987 991989-33.3% 98 9 98 7 988984984993991989991 993988-33.3%-33.3%-33.3%991 989989 |||||||||||||||||||||||||||||||||||||||||UEUEUEUEUEUEUEUEUEUEUEUEUE UE UE UEUE UE UE UE UEUEUEUE UE UE UE UE U E UEGGGGGG G G G GGGG GGGGGGGGG GGGGGGGG60605050XXXXX X15" RCP 12" RCP12" RCP 15" PVC15" RCP 24" RCPGMEMGMSIGN "STOP"SIGN "STOP"SIGN "NO PARKING"SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEPID: 257620010OWNER: CHANHASSEN CITYBITUMINOUS TRAILBITUMINOUS TRAILBITUMINOUS PARKING LOTSIGN "15MPH"TTCHAIN LINKCABXCABX10 10101010101010101010 10 10101012" RCP21" RCP12" PVC1 8 " P V C 8" PVC (PER PLAN) 8" DIP (PER PLAN)6" DIP (PER PLAN)8" DIP (PER PLAN) 8" PVC (PER PLAN)8" CIP (PER PLAN)50 DELRIODRIVE5021" RCPCABXROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)WOOD MULCHCONCRETESTAIRSROCK MULCH (TYP.)ROCK MULCH (TYP.)GRAVEL LOTDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONCBRE=990.37INV=987.37 NEINV=987.35 SCBRE=990.62CBRE=990.39INV=990.39 NINV=987.36 WCBRE=988.64INV=982.90 NINV=982.87 SINV=984.64 SWCBRE=987.59INV=981.39 NINV=981.43 SINV=983.02 WCBRE=987.33CBRE=987.77INV=981.35 NINV=981.31 SCBRE=987.74INV=981.12 EINV=981.15 SSTSTMHRE=988.19INV=980.55 WINV=? NE/SESUMP=974.87WEIR=982.93NOTCH=980.59STSTMHRE=988.01STSTMHRE=988.04H YDCBRE=994.17INV=991.53 SWINV=990.37 EINV=990.35 WCBRE=995.23INV=990.75 ECBRE=994.83CBRE=995.60HHCBRE=995.72INV=992.08 NEINV=991.88 SWCBRE=996.29INV=992.59 NEINV=992.85 SWGM8.00N16°56'27"EL=137.87meas.(137.88plat)R=474.00Δ=16°39'56"meas.(16°40'00"plat)N89°43'33"W 78.00N00°16'27"E 513.79N89°11'28"W 174.96N53°31'23"W 254.72N00°20'03"E 252.00 L=219.05R=171.00Δ=73°23'36"1005.91005.51005.71005.81001.61001.41001.61001.81001.01001.61001.0998.4998.8999.1999.2999.1998.9998.7998.7997.8995.6997.2995.0994.6995.2993.4993.2993.1993.5993.899 2 . 6 994.4995.7999.0996.9995.8997.0995.3995.699 5 . 7 9 9 4 . 4 994.2993.2992.3993.7994.8995.3995.8996.1995.8996.0995.6994.7994.8994.4993.5993.7991.8992.5994.8995.9992.2991.4993.8996.7997.8997.4995.3997.9995.7991.1991.7993.9995.2995.5996.2996.6997.2997.41000.71001.61003.21002.41001.9996.5995.7993.5992.7992.5991.1991.2990.8990.4993.1991.3990.2989.2990.8990.7990.3990.79 9 2 . 5 993.8991.8989.4 989.2989.0988.6988.7990.2991.4991.4992.0992.5989.4990.3990.7999.2998.7998.5998.51001.7 992.6992.8 99 0 991 99 2 993 994992993994993994995996 99 2 9939 9 0 9 9 1 99 2 99 3991992 996 997 998 999 1000 99899910001001100110021002100310031004100410051005 99699799899910001001992 993994995991 9 9 2 9 9 3 991 992 993 991 992 99 3 995 991991991992993994995996997991990 991 992 993 994 990 989 989 996996989 989 988 995 996997 998999 10001001100210031004100599910001001100210039929 9 3 9 9 4 995996997998 997 994992995996994993995WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.60HYD D2 STORYMULTIFAMILY12 UNITSFFE: 995.00GFE: 994.832 STORYMULTIFAMILY16 UNITSFFE: 996.00GFE: 995.83HYD DDSTORMWATER RETENTION(NURP) BASINS±44,590 C.F. COMBINEDTOTAL LIVE STORAGE±8,590 C.F. COMBINEDTOTAL DEAD STORAGETOP BERM: 993.00E.O. SPILLWAY: 992.50HWL: 992.06WQVE: 990.40NWL: 988.30RE-USE SHUTOFF: 987.00BOTTOM: 984.00DLODLODLODLODLOD LODLODLODLODLODLODLOD LODLODLODLOD LODL O D LODLODLODLODLODLODLODLODLOD LOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLOD LOD LOD LOD LOD LOD LOD INSTALL SILT FENCEPER CIVIL DETAILSINSTALL SILT FENCEPER CIVIL DETAILSINSTALL SILT FENCEPER CIVIL DETAILSINSTALL SILT FENCEPER CIVIL DETAILSINSTALL ROCK ENTRANCEPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL BIO ROLLSPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL BIO ROLLSPER CIVIL DETAILSINSTALL BIO ROLLSPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSDescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\EROSION CONTROL PLANS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalLandscape Architect under thelaws of the State of Minnesota.1RPBCWD Rev-107.21.2025Sheet:XX.XX.XX53234Joshua J McKinney, PLAN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C6.1PHASE 2EROSIONCONTROLLEGENDSCALE IN FEET06030EROSION CONTROL NOTES1.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/ORELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ONRECORDS OF THE VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTSTAKEN IN THE FIELD. THE INFORMATION SHALL NOT BE RELIED ON AS BEINGEXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONSPRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OR ENGINEER OFDISCREPANCIES.2.ALL SILT FENCE AND OTHER EROSION CONTROL FEATURES SHALL BE IN-PLACEPRIOR TO ANY EXCAVATION/CONSTRUCTION AND SHALL BE MAINTAINEDUNTIL VIABLE TURF OR GROUNDCOVER HAS BEEN ESTABLISHED. EXISTING SILTFENCE ON-SITE SHALL BE MAINTAINED AND OR REMOVED AND SHALL BECONSIDERED INCIDENTAL TO THE GRADING CONTRACT. IT IS OF EXTREMEIMPORTANCE TO BE AWARE OF CURRENT FIELD CONDITIONS WITH RESPECTTO EROSION CONTROL. TEMPORARY PONDING, DIKES, HAYBALES, ETC.,REQUIRED BY THE CITY SHALL BE INCIDENTAL TO THE GRADING CONTRACT.3.EROSION AND SILTATION CONTROL (ESC): THE CONTRACTOR SHALL ASSUMECOMPLETE RESPONSIBILITY FOR CONTROLLING ALL SILTATION AND EROSIONOF THE PROJECT AREA. THE CONTRACTOR SHALL USE WHATEVER MEANSNECESSARY TO CONTROL THE EROSION AND SILTATION INCLUDING BUT NOTLIMITED TO: CATCH BASIN INSERTS, CONSTRUCTION ENTRANCES, EROSIONCONTROL BLANKET, AND SILT FENCE. ESC SHALL COMMENCE WITH GRADINGAND CONTINUE THROUGHOUT THE PROJECT UNTIL ACCEPTANCE OF THEWORK BYTHE OWNER. THE CONTRACTOR'S RESPONSIBILITY INCLUDES ALLIMPLEMENTATION AS REQUIRED TO PREVENT EROSION AND THE DEPOSITINGOF SILT. THE OWNER MAY DIRECT THE CONTRACTOR'S METHODS AS DEEMEDFIT TO PROTECT PROPERTY AND IMPROVEMENTS. ANY DEPOSITION OF SILT ORMUD ON NEW OR EXISTING PAVEMENT OR IN EXISTING STORM SEWERS ORSWALES SHALL BE REMOVED AFTER EACH RAIN EVENT. AFFECTED AREAS SHALLBE CLEANED TO THE SATISFACTION OF THE OWNER, ALL AT THE EXPENSE OFTHE CONTRACTOR. ALL TEMPORARY EROSION CONTROL SHALL BE REMOVEDBY THE CONTRACTOR AFTER THE TURF IS ESTABLISHED.4.ALL STREETS DISTURBED DURING WORKING HOURS MUST BE CLEANED AT THEEND OF EACH WORKING DAY. A CONSTRUCTION ENTRANCE TO THE SITE MUSTBE PROVIDED ACCORDING TO DETAILS TO REDUCE TRACKING OF DIRT ONTOPUBLIC STREETS.5.PROPOSED PONDS SHALL BE EXCAVATED FIRST AND USED AS TEMPORARYPONDING DURING CONSTRUCTION.6.WHEN INSTALLING END-OF-LINE FLARED END SECTIONS, BRING THE SILT FENCEUP & OVER THE FLARED END SECTIONS & COVER DISTURBED AREAS WITH RIPRAP. THE UPSTREAM FLARED END SECTIONS SHALL HAVE WOOD FIBER BLANKETINSTALLED ON THE DISTURBED SOILS.7.ALL UNPAVED AREAS ALTERED DUE TO CONSTRUCTION ACTIVITIES MUST BERESTORED WITH SEED AND MULCH, SOD, EROSION CONTROL BLANKET OR BEHARD SURFACED WITHIN 2 WEEKS OF COMPLETION OF CONSTRUCTION.8.THE SITE MUST BE STABILIZED PER THE REQUIREMENTS OF THE MPCA, NPDES,MNDOT, AND CITY.A. TEMPORARY (GREATER THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 22-111AT 30.5-POUNDS PER ACRE.B. TEMPORARY (LESS THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 21-112(FALL) OR 21-111 (SPRING/SUMMER) AT 100-POUNDS PER ACREC.INFILTRATION/FILTRATION BASIN SHALL BE MNDOT SEED MIX 34-262 AT14.5-POUNDS PER ACRE.D. POND SLOPES SHALL BE MNDOT SEED MIX 33-261 AT 35-POUNDS PER ACRE.E. GENERAL SEEDING SHALL BE MNDOT SEED MIX 25-151 AT 70-POUNDS PERACRE.F. MULCH SHALL BE MNDOT TYPE 1 APPLIED AT 2-TONS PER ACRE.9.FOR AREAS WITH SLOPES OF 3:1 OR GREATER, RESTORATION WITH SOD OREROSION CONTROL BLANKET IS REQUIRED.10.ALL TEMPORARY STOCKPILES MUST HAVE SILT FENCE INSTALLED AROUNDTHEM TO TRAP SEDIMENT.11.ALL PERMANENT PONDS USED AS TEMPORARY SEDIMENT BASINS DURINGCONSTRUCTION SHALL BE DREDGED AFTER THE SITE HAS BEEN STABILIZED TORESTORE THE POND TO THE PROPOSED BOTTOM ELEVATION.12.ALL CONSTRUCTION SHALL CONFORM TO LOCAL AND STATE RULESINCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM(NPDES) PERMIT REQUIREMENTS.13.THE SITE MUST BE KEPT IN A WELL-DRAINED CONDITION AT ALL TIMES. THECONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING, OROTHER MEANS REQUIRED TO INSURE PROPER DRAINAGE DURINGCONSTRUCTION. LOW POINTS IN ROADWAYS OR BUILDING PADS MUST BEPROVIDED WITH A POSITIVE OUTFLOW.RPBCWD STANDARD EROSIONCONTROL NOTES1.NATURAL TOPOGRAPHY AND SOIL CONDITIONS MUST BE PROTECTED,INCLUDING RETENTION ONSITE OF NATIVE TOPSOIL TO THE GREATEST EXTENTPOSSIBLE.2.ADDITIONAL MEASURES, SUCH AS HYDRAULIC MULCHING AND OTHERPRACTICES AS SPECIFIED BY THE DISTRICT MUST BE USED ON SLOPES OF 3:1(H:V) OR STEEPER TO PROVIDE ADEQUATE STABILIZATION.3.FINAL SITE STABILIZATION MEASURES MUST SPECIFY THAT AT LEAST SIX INCHESOF TOPSOIL OR A MINIMUM OF 5% ORGANIC MATTER BE SPREAD ANDINCORPORATED INTO THE UNDERLYING SOIL DURING FINAL SITE TREATMENTWHEREVER TOPSOIL HAS BEEN REMOVED.4.CONSTRUCTION SITE WASTE SUCH AS DISCARDED BUILDING MATERIALS,CONCRETE TRUCK WASHOUT, CHEMICALS, LITTER AND SANITARY WASTE MUSTBE PROPERLY MANAGED.5.ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BEMAINTAINED UNTIL COMPLETION OF CONSTRUCTION AND VEGETATION ISESTABLISHED SUFFICIENTLY TO ENSURE STABILITY OF THE SITE, AS DETERMINEDBY THE DISTRICT.6.ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE REMOVEDUPON FINAL STABILIZATION.7.SOIL SURFACES COMPACTED DURING CONSTRUCTION AND REMAININGPERVIOUS UPON COMPLETION OF CONSTRUCTION MUST BE DECOMPACTEDTO ACHIEVE A SOIL COMPACTION TESTING PRESSURE OF LESS THAN 1,400KILOPASCALS OR 200 POUNDS PER SQUARE INCH IN THE UPPER 12 INCHES OFTHE SOIL PROFILE WHILE TAKING CARE TO PROTECT UTILITIES, TREE ROOTS, ANDOTHER EXISTING VEGETATION.8.ALL DISTURBED AREAS MUST BE STABILIZED WITHIN 7 CALENDAR DAYS AFTERLAND-DISTURBING WORK HAS TEMPORARILY OR PERMANENTLY CEASED ON APROPERTY THAT DRAINS TO AN IMPAIRED WATER, WITHIN 14 DAYS ELSEWHERE.9.THE PERMITTEE MUST, AT A MINIMUM, INSPECT, MAINTAIN AND REPAIR ALLDISTURBED SURFACES AND ALL EROSION AND SEDIMENT CONTROL FACILITIESAND SOIL STABILIZATION MEASURES EVERY DAY WORK IS PERFORMED ON THESITE AND AT LEAST WEEKLY UNTIL LAND-DISTURBINGACTIVITY HAS CEASED.THEREAFTER, THE PERMITTEE MUST PERFORM THESE RESPONSIBILITIES AT LEASTWEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED. THE PERMITTEE WILLMAINTAIN A LOG OF ACTIVITIES UNDER THIS SECTION FOR INSPECTION BY THEDISTRICT ON REQUEST.PROPERTY BOUNDARYEXISTING CONTOURPROPOSED CONTOURSETBACK LINERIGHT OF WAY LINEEASEMENTSTANDARD CURB AND GUTTERSTORM SEWERFLARED END SECTIONRETAINING WALLDRAINTILEGRADING LIMITSSPOT ELEVATIONFLOW DIRECTIONEMERGENCY OVERFLOWROCK CONSTRUCTION ENTRANCEEROSION CONTROL BLANKETINLET PROTECTIONSILT FENCEBIOROLLLODD-1.50%1000.00E.O.18 DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\SWPPP NARRATIVE & NOTES.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C7.0SWPPP NARRATIVESWPPP NARRATIVETHE SWPPP IS PREPARED IN ACCORDANCE WITH THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)REGULATIONS AS ESTABLISHED BY THE CLEAN WATER ACT. THE MINNESOTA POLLUTION CONTROL AGENCY'S CONSTRUCTIONGENERAL PERMIT MN R100001 (CSGP) (EXPIRATION DATE JULY 31, 2023) PROVIDES A FRAME WORK OF REQUIREMENTS FORCOMPLIANCE TO DISCHARGE STORMWATER FROM A CONSTRUCTION SITE.THE SWPPP IS FOR IMPLEMENTATION BY THE OWNER AND OPERATOR, AS LISTED BELOW, AT SANTA VERA APARTMENTS. THIS REPORTSHALL BE ON THE SITE AT ALL TIMES DURING CONSTRUCTION. THE OWNER MUST ALSO KEEP THIS SWPPP ON FILE FOR THREE YEARSAFTER SUBMITTAL OF THE NOTICE OF TERMINATION. THE FOLLOWING ARE OUTLINED IN THIS SWPPP:- CONTROL MEASURES FOR STORM WATER POLLUTION PREVENTION PRIOR TO AND DURING CONSTRUCTION- CONTROL MEASURES FOR STORM WATER POLLUTION PREVENTION AFTER CONSTRUCTION- SOURCES OF STORMWATER AND NON-STORMWATER POLLUTION- INSPECTION AND MAINTENANCE PROCEDURESTHE GRADING AND EROSION CONTROL PLAN PREPARED FOR SANTA VERA APARTMENTS SHALL BE CONSIDERED PART OF THE SWPPP.PROJECT LOCATIONTHIS DOCUMENT PRESENTS A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR SANTA VERA APARTMENTS INCHANHASSEN, MINNESOTA. THE SITE IS LOCATED ON 3.85 ACRES NEAR THE INTERSECTION OF SANTA VERA DRIVE AND LAREDODRIVE.PROJECT CONTACT INFORMATIONOWNER/DEVELOPER: HEADWATERS DEVELOPMENTOWNER ADDRESS:6757 KARMEN AVENUEALBERTVILLE, MNOWNER EMAIL:RYAN@HEADWATERSDEVELOPMENT.COMCONTRACTOR: TBDCOMPANY NAME: TBDIDENTIFY PERSONNEL INVOLVED WITH THE PROJECT AND THEIR RELATED NECESSARY TRAINING COMMENSURATE WITH THEIR TASKPRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES.SWPPP DESIGNER: MEASURE GROUP, LLCPETER MOREAUPO BOX 10WAYZATA, MN 55391612-440-0934PMOREAU@MEASUREGRP.COMDESIGN OF CONSTRUCTION SWPPP, U OF M 05/31/28SWPPP INSPECTION:TBDBMP INSTALLER:TBDOWNER/OPERATOR RESPONSIBILITIESOWNER·DEVELOPMENT OF SWPPP PRIOR TO APPLICATION/NOI SUBMITTAL.·SUBMIT A COMPLETE AND ACCURATE APPLICATION FORM (NOI)·COMPLIANCE WITH ALL TERMS AND CONDITIONS OF CONSTRUCTION GENERAL STORMWATER PERMIT·SWPPP SUBMITTAL FOR 30 DAY REVIEW FOR PROTECT GREATER THAN 50 ACRES & DISCHARGING TO SPECIAL/IMPAIREDWATERS WITHIN 1 MILE OF SITE DISCHARGE.·KEEPING PERMIT COVERAGE UP-TO-DATE (TRANSFER/SUBDIVISION)·SUBMIT NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS AFTER ALL PERMIT TERMINATION CONDITIONS AS LISTED IN SECTION13 ARE COMPLETE·SUBMIT NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS OF MEETING REQUIREMENTS OF FINAL STABILIZATION·IDENTIFY WHO HAS LONG TERM OPERATION AND MAINTENANCE RESPONSIBILITY OF THE PERMANENT STORMWATER SYSTEM.·DEVELOP CHAIN OF RESPONSIBILITY WITH ALL OPERATORS TO ENSURE NPDES COMPLIANCE.·IDENTIFY TRAINED PERSONNEL TO DEVELOP THE SWPPP, INSTALL AND MAINTAIN BEST MANAGEMENT PRACTICES, AND OVERSEETHE SWPPP AND CONDUCT INSPECTIONSOPERATOR·COMPLETION OF AN ACCURATE NOI WITH THE OWNER·COMPLIANCE WITH CSGP SECTIONS 3, 4, 6-22, 24 AND ANY APPLICABLE REQUIREMENTS FOR CONSTRUCTION ACTIVITY INSECTION 23 (MINN. R. 7090)·KEEPING THE PERMIT UP-TO-DATE WITH THE OWNER (PARTIAL, WHOLE, CONTRACTOR, BUILDER, ETC)·COMPLETE AND SIGN APPLICATIONS FOR PERMIT TRANSFER AND MODIFICATION AND NOTICE OF TERMINATION WITH OWNERAS NEEDED.PROJECT DESCRIPTIONTHE SITE IS APPROXIMATELY 3.85 ACRES. CONSTRUCTION WILL CONSIST OF, BUT IS NOT LIMITED TO GRADING AND TWO FILTRATIONBASINS. THE PROPOSED PHASING OF THE DEVELOPMENT WILL CONSIST OF THE CONSTRUCTION OF A MULTIFAMILY HOUSINGDEVELOPMENT WITH ASSOCIATED BUILDINGS, PARKING LOT, AND UTILITY INFRASTRUCTURE.PROJECT AREA = 3.85 ACRESDISTURBED AREA = 2.81 ACRESEXISTING IMPERVIOUS AREA = 0.87 ACRES (INCLUDING R.O.W.)PROPOSED IMPERVIOUS AREA = 1.98 ACRES (INCLUDING R.O.W.)PRE-DEVELOPMENT SITE CONDITIONSSITE IS GENERALLY CONSISTENT WITH TYPE "D" SOILS. THE EXISTING SITE GENERALLY DRAINS FROM NORTHWEST TO THE SOUTHEAST.REFER TO GEOTECHNICAL REPORT DATED XX/XX/2025 COMPLETED BY BRAUN INTERTEC.POST-DEVELOPMENT SITE CONDITIONSTHE PROPOSED SITE MAINTAINS THE OVERALL EXISTING DRAINAGE PATTERNS. MOST OF THE SITE DRAINS FROM NORTHWEST TOSOUTHEAST. THE RUNOFF FROM MOST OF THE SITE WILL BE DIRECTED THROUGH STORM SEWER TO THE DETENTION BASIN(S).STORM WATER MANAGEMENT PLAN·THE TEMPORARY STORMWATER MANAGEMENT PLAN WILL CONSIST OF GUIDELINES SET FORTH IN ITEMS 7 AND 8 OF THE SWPPPNOTES SECTION.·THE PERMANENT STORM WATER MANAGEMENT PLAN WILL CONSIST OF SURFACE DRAINAGE BY CURB AND GUTTER, SWALESAND STORM SEWER PIPE.·THE SITE DRAINAGE WILL BE ROUTED TO PROPOSED STORM SEWER WHICH WILL DISCHARGE TO THE DETENTION BASIN(S) .·REFER TO THE PROJECT STORMWATER MANAGEMENT REPORT FOR MORE INFORMATION REGARDING THE PRE-DEVELOPMENTSITE CONDITIONS, POST-DEVELOPMENT SITE CONDITIONS, AND STORM WATER MANAGEMENT CALCULATIONS.·THE SITE STORM WATER DETENTION FACILITY WILL BE CONSTRUCTED TO MEET OR EXCEED LOCAL, STATE AND FEDERALREQUIREMENTS.·TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMP'S ALONG WITH THE PROCEDURES TO BE USED TOESTABLISHED ADDITIONAL TEMPORARY BMP'S AS NECESSARY FOR SITE CONDITIONS DURING CONSTRUCTION ARE IDENTIFIEDON THE SITE GRADING AND EROSION CONTROL PLAN PREPARED FOR THE DEVELOPMENT OF THIS PROJECT, AND WITHIN THEPROJECT STORM WATER POLLUTION PREVENTION PLAN.POTENTIAL STORM WATER POLLUTANTSPOTENTIAL POLLUTANT SOURCES, INCLUDING CONSTRUCTION AND WASTE MATERIALS THAT ARE USED OR STORED AT THE SITE, AREDESCRIBED IN THE SECTION. BY IMPLEMENTATION OF THESE BMPS, THE POTENTIAL POLLUTANT SOURCES ARE NOT REASONABLYEXPECTED TO AFFECT THE STORM WATER DISCHARGES FROM THE SITE.CONSTRUCTION MATERIALS, CHEMICALS AND WASTE MATERIALS THAT WILL BE USED OR STORED AT THE SITE:CONSTRUCTION SEQUENCETHE INTENDED SEQUENCING OF MAJOR SITE CONSTRUCTION ACTIVITIES IS AS FOLLOWS:1. INSTALL PERIMETER CONTROL DEVICES (SILT FENCE, BIO-LOGS, ETC.) AND INLET PROTECTION TO EXISTING STRUCTURES ASSHOWN ON PLAN.INSTALL TREE PROTECTION FENCE AS SHOWN ON PLAN.2. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE.3. CLEAR AND GRUB SITE.4. STRIP AND STOCKPILE TOPSOIL.5. ROUGH GRADE OF SITE.6. STABILIZE DENUDED AREAS AND STOCKPILES.7. INSTALL SANITARY SEWER, WATERMAIN, STORM SEWER AND SERVICES.8. INSTALL INLET PROTECTION AROUND CATCH BASINS.9. INSTALL STREET SECTION.10. INSTALL CURB AND GUTTER.11. INSTALL PAVEMENT.12. INSTALL SMALL UTILITIES (GAS, ELECTRIC, PHONE, CABLE, ETC.)13. FINE GRADE BOULEVARD, LANDSCAPE AREAS, SEED AND MULCH.14. REMOVE ACCUMULATED SEDIMENT.15. FINAL GRADE.16. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR SOD AND LANDSCAPING,REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL.CONSTRUCTION NOTESIT IS HIGHLY RECOMMENDED THAT THE CONTRACTOR MAINTAIN A STOCKPILE OF EROSION CONTROL DEVICES AND SEDIMENTCONTROL BMP'S ON SITE AT ALL TIMES FOR IMMEDIATE USAGE. IN THE EVENT OF AN ACCIDENTAL SEDIMENT DISCHARGE TOWATERS OF THE STATE, OR ANY DISCHARGE OF HAZARDOUS MATERIAL OF REPORTABLE QUANTITY, CONTACT THE MPCA STATEDUTY OFFICER AT 1-800-422-0798.TIMING OF BMP INSTALLATIONTHE EROSION PREVENTION AND SEDIMENT CONTROL BMP'S SHALL BE INSTALLED TO MINIMIZE EROSION FROM DISTURBED SURFACESAND CAPTURE SEDIMENT ON SITE. THE FOLLOWING LIST DEFINES THE TIMING OF EROSION PREVENTION AND SEDIMENT CONTROLMEASURES IN SPECIFIC AREAS.PRIOR TO START OF CONSTRUCTIONTHE FOLLOWING EROSION PREVENTION AND SEDIMENT CONTROL MEASURES ARE SHOWN IN THE PLANS AND SHALL BE IMPLEMENTEDPRIOR TO CONSTRUCTION:1. INSTALL SILT FENCE OR OTHER SEDIMENT CONTROL AROUND THE PERIMETER OF AREAS TO BE GRADED AND ALL AREAS WHICH ARENOT TO BE DISTURBED AS SHOWN ON THE GRADING AND EROSION CONTROL PLAN.2. CONSTRUCT GRAVEL CONSTRUCTION ENTRANCES AT FIELD ENTRANCES TO THE SITE AS SHOWN ON THE CONSTRUCTION PLANS.3. INLET PROTECTION IS TO BE INSTALLED AT ALL STORM WATER INLETS WHICH HAVE THE POTENTIAL TO RECEIVE STORM WATERRUNOFF FROM THE CONSTRUCTION SITE WITHIN 200 FEET OF LIMITS OF CONSTRUCTION.4. INSTALL SILT FENCE OR OTHER SEDIMENT CONTROL AROUND ALL TEMPORARY INACTIVE STOCKPILES. ALL SILT FENCES FORSTOCKPILES SHALL BE INCIDENTAL TO GRADING CONTRACT IF STOCKPILES ARE PLACED OUTSIDE OF SILT FENCES SHOWN ON THEPLAN.DURING CONSTRUCTIONTHE FOLLOWING EROSION PREVENTION AND SEDIMENT CONTROL MEASURES ARE SHOWN IN THE PLANS AND SHALL BE IMPLEMENTEDDURING CONSTRUCTION:1. PHASE GRADING WORK TO MINIMIZE THE DURATION THAT ANY DISTURBED SOIL IS EXPOSED.2. ALL DISTURBED AREAS SHALL HAVE TEMPORARY PROTECTION OR PERMANENT COVER OVER EXPOSED SOIL AREAS IF NOT BEINGACTIVELY GRADED AND/OR IF NOT AT FINAL GRADE WITHIN 7 DAYS OF DISTURBANCE ACTIVITY TEMPORARILY OR PERMANENTLYCEASING. TEMPORARY SEED MIX 22-111, APPLIED AT A RATE OF 30.5 LBS/ACRE, SHALL BE USED PRIOR TO WINTER, IF SITE NOTSODDED.3. STRIP AND STOCKPILE TOPSOIL FOR REPLACEMENT OF 6 INCHES OF TOPSOIL OVER TURF AREAS WHEN GRADING IS COMPLETE.4. PLACE A MINIMUM OF 2 TONS/ACRE OF STRAW ON ALL AREAS AFTER REACHING FINAL GRADE WITH TOPSOIL AND ANCHORSTRAW WITH EITHER A STRAIGHT DISK, HYDROMULCH OR POLYMER.5. STABILIZATION OF TEMPORARY OR PERMANENT DRAINAGE DITCHES THAT DRAIN WATER FROM THE CONSTRUCTION SITE MUST BEINITIATED WITHIN 24 HOURS OF CONNECTING THE DRAINAGE DITCH TO ANY CONVEYANCE SYSTEM THAT DISCHARGES TOSURFACE WATERS. THE FIRST 200 LINEAR FEET MUST BE STABILIZED WITHIN 24 HOURS. THE REMAINING DITCH SHALL BE STABILIZEDWITHIN 7 DAYS.6. INSTALL SILT FENCE AROUND ALL TEMPORARY INACTIVE STOCKPILES WHICH ARE NOT PLACED WITHIN EXISTING SILT FENCES OROTHER PERIMETER CONTROLS.7. TEMPORARY OR PERMANENT ENERGY DISSIPATION AT PIPE APRON OUTLETS WILL BE PLACED PRIOR TO BUT NO SOONER THAN 7DAYS BEFORE APRON IS INSTALLED. RIPRAP SHALL BE INSTALLED UNDER APRON LIP ACCORDING TO THE STANDARD DETAIL.8. SUFFICIENT PERSONNEL, EQUIPMENT, AND MATERIALS SHALL BE MOBILIZED WITHIN 24 HOURS OF A WRITTEN ORDER BY THEOWNER OR OWNER'S REPRESENTATIVE TO CONDUCT CORRECTIVE WORK AND INSTALL TEMPORARY EROSION CONTROL WORK INTHE CASE OF AN EMERGENCY.9. REMOVE ANY SEDIMENT THAT HAS BEEN TRACKED ONTO PUBLIC STREETS AT THE END OF THE DAY OR WITHIN 24 HOURS OFDETECTION, OR MORE FREQUENT AT DIRECTION OF SITE INSPECTOR.10. COLLECT ALL CONSTRUCTION DEBRIS IN DUMPSTERS AND ROLL-OFF BOXES, EMPTY WHEN DEBRIS REACHES TOP OF DUMPSTER11. INSPECT POLLUTION CONTROL MEASURES AS SPECIFIED WITHIN SECTION 11 OF THE GENERAL PERMIT.INLET SEDIMENT CONTROL BMP REMOVALIF INLET SEDIMENT CONTROLS (WIMCO TYPE OR EQUAL) BMP'S ARE REMOVED FOR FLOODING / FREEZING CONCERNS UPONREQUEST OF THE MUNICIPALITY, WATERSHED DISTRICT OR OTHER AGENCY, DOCUMENTATION SHALL BE ATTACHED TO THEINSPECTION REPORTS AND THIS SWPPP OR BEAVAILABLE WITHIN 72 HOURS OF REQUEST. DOCUMENTATION SHALL BE A WRITTEN FORM OF CORRESPONDENCE VERIFYING THENEED FOR REMOVAL.UPON COMPLETION OF CONSTRUCTION ACTIVITIESPERMIT TERMINATION CONDITIONS ARE ACHIEVED FOR THE PROJECT WHEN PERMANENT EROSION CONTROL BMP'S ARE APPLIED TOTHE SITE. THE PERMANENT EROSION CONTROL BMP'S MAY BE A COMBINED OF VEGETATIVE AND NON-VEGETATIVE COVER TYPES.ADDITIONAL REQUIREMENTS TO ACHIEVING FINAL STABILIZATION PERMIT TERMINATION CONDITIONS INCLUDE:1. ALL SOIL DISTURBING ACTIVITY IS COMPLETED. ALL DISTURBED AREA WITHOUT PERMANENT IMPERMEABLE SURFACES AREVEGETATED FOR FINAL STABILIZATION.2. PERMANENT STORMWATER TREATMENT SYSTEM (IF REQUIRED) IS CONSTRUCTED AND ACCUMULATED SEDIMENT HAS BEENREMOVED FROM CONSTRUCTION ACTIVITY. CLEAN OUT ALL SEDIMENT FROM CONVEYANCES AND FROM TEMPORARY SEDIMENTBASINS THAT ARE TO BE USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS. THE CLEAN OUT OF PERMANENT BASINS MUSTBE SUFFICIENT TO RETURN THE BASIN TO DESIGN CAPACITY.3. THE VEGETATIVE COVER FOR THE SITE IS AT A DENSITY, WITH UNIFORM PERENNIAL COVER OF 70% OF THE EXPECTED FINALGROWTH DENSITY.4. ALL TEMPORARY, SYNTHETIC BMP'S HAVE BEEN REMOVED.PERMANENT VEGETATION ESTABLISHMENTPERMANENT TURF SHALL FOLLOW THE RECOMMENDATIONS PER NOTES AND SPECIFICATIONS IN THE GRADING AND/OR LANDSCAPEPLAN. SEED THAT IS TO OCCUR AFTER OCTOBER 20TH SHALL CONFORM TO THE MNDOT SPECIFICATIONS FOR DORMANT SEEDING.SWPPP INSPECTIONS AND MAINTENANCE EROSION AND SEDIMENT CONTROL INSPECTIONSCONSTRUCTION ACTIVITY AND ALL SUPPORT ACTIVITIES MUST BE INSPECTED (USING MPCA CONSTRUCTION STORMWATERINSPECTION CHECKLIST OR AN ALTERNATIVE FORM) WITHIN THE PARAMETERS OF THE SCHEDULE BELOW. THE INSPECTOR SHALL BEA PERSON TRAINED AND FAMILIAR WITH THE REQUIREMENTS OF THIS SWPPP AND THE MPCA MN R100001 PERMIT. ALTERNATES WILLINCLUDE INDIVIDUALS TO BE DESIGNATED BY THE OWNER AND MAY INCLUDE CONTRACTOR PERSONNEL OR OTHER QUALIFIEDINDIVIDUALS AND SHALL BE LISTED IN THE PROJECT CONTACT INFORMATION SECTION OF THIS PLANINSPECTION SCHEDULE:- IF THE SITE IS ACTIVE: INSPECTION NEEDED ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL GREATER THAT0.5 INCHES.- INACTIVE AND STABILIZED AREAS: INSPECTION NEEDED ONCE EVERY 30 CALENDAR DAYS.- INACTIVE AREAS WITH FINAL STABILIZATION: INSPECTION NEEDED ONCE EVERY MONTH FOR 12 MONTHS (NOT INCLUDING FROZENCONDITIONS).- SUBJECT TO WINTER/FROZEN CONDITIONS: NOT APPLICABLE/NOT NEEDED IF NO CONSTRUCTION ACTIVITY IS OCCURRING.SCOPE OF INSPECTION SHALL INCLUDE:1. RECORD DATE AND TIME OF INSPECTION2. NAME OF PERSON(S) CONDUCTING INSPECTION3. FINDINGS OF THE INSPECTION4. LOCATION AND CORRECTIVE ACTIONS NEEDED5. CORRECTIVE ACTIONS TAKEN (DATE.TIME/BY WHOM)6. DATE AND AMOUNT OF RAINFALL (RAINFALL AMOUNTS TO BE TAKEN FROM AN ONSITE RAIN GAUGE)7. OBSERVED DISCHARGES LOCATIONS8. DESCRIBE DISCHARGE (COLOR, ODOR, FLOATING. SETTLED, SOLIDS, FOAM, OIL SHEEN)9. THE SITE INSPECTOR WILL VISUALLY CHECK A DISCHARGE FROM A TEMPORARY OR PERMANENT SEDIMENTATION BASIN TO ENSUREADEQUATE TREATMENT IS OBTAINED AND DISCHARGE WATER WILL NOT CONTRIBUTE EXCESSIVE SEDIMENT OR OTHER NUISANCECONDITIONS.10. RECORD CHANGES MADE TO THE SWPPP. AMENDMENTS FROM INSPECTIONS NEED TO BE COMPLETED WITHIN 7 DAYS.11. ALL INSPECTIONS SHALL BE DOCUMENTED WITHIN 24 HOURS AFTER COMPLETING THE FIELD INSPECTION AND AVAILABLE IN PAPEROR ELECTRONIC FORM ON SITE.MAINTENANCE OF EROSION AND SEDIMENT CONTROL DEVICESTHE OWNER/CONTRACTOR IS RESPONSIBLE FOR THE OPERATION, MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITYMANAGEMENT BMPS AS WELL AS ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS, FOR THE DURATION OF THECONSTRUCTION WORK AT THE SITE. THE CONTRACTOR MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPSAND POLLUTION PREVENTION MANAGEMENT MEASURES TO ENSURE INTEGRITY AND EFFECTIVENESS DURING ALL ROUTINE AND POSTRAINFALL EVENTS. ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WITH FUNCTIONAL BMPS BY THEEND OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS UNLESS ANOTHER TIMEFRAME IS SPECIFIED BELOW.THE FOLLOWING GUIDELINES WILL BE USED TO DETERMINE IF THE EROSION AND SEDIMENT CONTROL DEVICES REQUIREMAINTENANCE, REPAIR, OR REPLACEMENT:1. ALL NON-FUNCTIONAL BMPS - OBSERVED CONDITION; SEDIMENT OVERTOPPING, UNDER WATER, SCOURED ENDS, UNDERMINED,DESTROYED, NON-FUNCTION AS DESIGNED, ETC. - SHALL BE MAINTAINED OR REPLACED BY THE END OF THE NEXT BUSINESS DAYAFTER DISCOVERY OR NOTIFICATION, OR AS SOON AS FIELD CONDITIONS ALLOW.2. PERIMETER SEDIMENT CONTROL (SILT FENCE, FIBER LOGS, BERMS, ETC.) - OBSERVED CONDITION TO BE 1/2 FULL OF SEDIMENT,FLATTENED TO 12 HEIGHT, DRIVEN OVER, UNDERMINED, SCOURED, MOVED FOR ACCESS, ETC. - SHALL BE MAINTAINED, REPAIRED ORSUPPLEMENTATION OF PERIMETER SEDIMENT CONTROL SHOULD BE DONE BY THE END OF NEXT BUSINESS DAY OR AD FIELDCONDITIONS ALLOW.3. INLET PROTECTION BMPS, CONVEYANCES, SURFACE WATERS - OBSERVED CONDITION; SEDIMENT DEPOSITION, SEDIMENT DELTASAN ACCUMULATION OF SEDIMENT MATERIAL, DEVICES APPEAR PLUGGED WITH SEDIMENT - REMOVAL/CLEAN OUT OFACCUMULATED SEDIMENT AND DELTAS TO BE REMOVED WITHIN 7 DAYS, STABILIZE AS NEEDED IF SOILS ARE EXPOSED DURINGREMOVAL/CLEAN OUT.4. TEMPORARY SEDIMENT BASINS AND TRAPS/PERMANENT SEDIMENT BASINS - OBSERVED TO HAVE SEDIMENT DEPOSITION ANDACCUMULATION TO 1/2 OF THE STORAGE VOLUME - CLEAN OUT, REMOVE ACCUMULATED SEDIMENT MATERIAL WITHIN 7 DAYS OFOBSERVATION, OR AS FIELD CONDITIONS ALLOW ACCESS.5. SITE EXIT LOCATIONS, ROCK EXIT PADS, OTHER ANTI-TRACKING PRACTICES - OBSERVED TO HAVE ACCUMULATED SEDIMENT INROCK OR OTHER ANTI-TRACKING BMP, TRACKING OF SEDIMENT FROM THE SITE ONTO PAVED SURFACES - TOP DRESS ROCK,MAINTAIN ROCK EXIT OR OTHER ANTI-TRACKING CONTROLS, SCRAP PAVED SURFACES, SWEEP PAVED SURFACES WITHIN 1CALENDAR DAY OF DISCOVERY.6. PAVED SURFACES AND ADJACENT STREETS - OBSERVED TO BE TRACKED WITH SEDIMENT AND SOIL MATERIAL FRO THE SITEHAULING OR ACCESS -SWEEP WITHIN 1 CALENDAR DAY OF DISCOVERY, ADDITIONAL AND/OR MORE FREQUENT SWEEPING MAY BENEEDED TO MAINTAIN PUBLIC SAFETYOR PREVENT WASHING FROM FORECASTED RAINS.7. STREET SWEEPING IS REQUIRED ONE TIME PER WEEK AND AFTER RAINFALL OR MORE FREQUENTLY IF DIRECTED BY CITY ENGINEER.TERMINATION OF COVERAGETHE PROJECT PERMIT MAY BE TERMINATED IN ONE OF THE FOLLOWING SCENARIOS:1. ALL CONSTRUCTION ACTIVITY IS COMPLETE, TEMPORARY SYNTHETIC BMP'S ARE REMOVED, ACCUMULATED SEDIMENT FROMCONSTRUCTION IS REMOVED, AND PERMANENT COVER HAS BEEN ACHIEVED WITH VEGETATIVE AND/OR NON-VEGETATIVE COVER.THE NOTICE OF TERMINATION FORM FROM THE PCA SHOULD BE COMPLETED WITHIN 30 DAYS OF MEETING THE CONDITIONS ABOVE.UPON MIDNIGHT OF THE POST MARKED DATE, THE PERMIT COVERAGE IS TERMINATED UNLESS OTHERWISE NOTIFIED BY THE MPCA.OR:2. WITHIN 30 DAYS OF SELLING OR OTHERWISE LEGALLY TRANSFERRING OWNERSHIP OF THE SITE IN IT'S ENTIRETY (INCLUDING STREETSWEEPING AND STORMWATER INFRASTRUCTURE) FROM THE ORIGINAL OWNER TO ANOTHER PARTY TAKING RESPONSIBILITY OFOWNERSHIP. THE TERMINATION IS EFFECTIVE UPON MIDNIGHT OF THE SUBMISSION DATE OF THE NOT. IF A PORTION OF THE SITE ISTRANSFERRED (I.E. OUTLOTS,LOTS/BLOCKS) THAT PORTION OF THE SITE IS TERMINATED FROM THE ORIGINAL PERMIT COVERAGE ATMIDNIGHT OF THE SUBMISSION DATE. OR:3. PERMIT COVERAGE CAN BE TERMINATED IF ALL OF THE FOLLOWING ARE MET:3.a. CONSTRUCTION ACTIVITY HAS CEASED FOR 90 DAYS; AND3.b. AT LEAST 90% OF THE AREA OF THE ORIGINALLY PROPOSED ACTIVITY HAS BEEN COMPLETED AND PERMANENTLY ESTABLISHEDWITH VEGETATION OR NON-VEGETATIVE COVER; AND3.c. WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE, PERMANENT COVER HAS BEEN ESTABLISHED; AND3.d. THE SITE IS COMPLIANT WITH PERMIT SECTIONS 13.3 THROUGH 13.7.4. WHERE THE PROJECT OBTAINED PERMIT COVERAGE BUT NEVER STARTED CONSTRUCTION ACTIVITY DUE TO CANCELLATION OROTHER REASONS, DOCUMENTATION SHOULD BE SENT TO THE MPCA WITH THE NOT FORM AND IS SUBJECT TO MPCA APPROVAL.POTENTIAL POLLUTANTLOCATIONCONTROL MEASUREANTIFREEZEVARIOUSSECONDARY CONTAINMENT/DRIP PANDIESEL FUELVARIOUSSECONDARY CONTAINMENT/DRIP PANFERTILIZERLANDSCAPE CONTRACTORSECONDARY CONTAINMENTGASOLINEIN EQUIPMENT/FUELING AREASECONDARY CONTAINMENT/DRIP PANGLUE/ADHESIVESCONTRACTORSECONDARY CONTAINMENTHYDRAULIC OILCONTRACTORSECONDARY CONTAINMENTPAINTSCONTRACTORSECONDARY CONTAINMENTGREASECONTRACTORSECONDARY CONTAINMENT/DRIP PANSANITARY WASTEPORTABLE BATHROOMSSERVICE PROVIDER TO SECURE UNITS FROM TIPPINGSOIL AMENDMENTSLANDSCAPE CONTRACTORSECONDARY CONTAINMENTCONCRETETRUCK WASHOUTWASHOUT AREACONCRETE/MORTARMOBILE MIXERS.C / WASHOUT AREASWPPP BMP QUANTITIESSILT FENCE 830 LFBIO-ROLL 60 LFINLET PROTECTION 21 EACHCULVERT/FES PROTECTION6 EACHTEMPORARY SEED MIX AS NEEDEDPERMANENT SEED MIX 8,317 SFSOD 39,204 SFROCK CONSTRUCTION ENTRANCE 1 EACHSTREET SWEEPING1 EACH19 DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\SWPPP NARRATIVE & NOTES.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C7.1SWPPP NARRATIVE& NOTESLISTED BELOW ARE ADDITIONAL BMP'S THAT MAY BE CONSIDERED FOR USE IF THE BMP'S IDENTIFIED IN THEEROSION CONTROL PLANS PROVE TO BE INSUFFICIENT. PAYMENT FOR THESE BMP'S MAY ONLY BE MADE IFPRIOR APPROVAL FROMAN OWNER HAS BEEN GIVEN.1.IMPORTANT VEGETATION·SAFETY FENCE OR A SIMILAR METHOD OF PROTECTION SHALL BE INSTALLED TO PROTECT IMPORTANTVEGETATION AND PROHIBIT VEHICULAR TRAFFIC.·A SECONDARY SILT FENCE SHALL BE INSTALLED AT FIELD OFFICES, STORED EQUIPMENT (INCLUDINGVEHICLE PARKING), CONSTRUCTION MATERIAL LOCATIONS, AND TOPSOIL OR FILL STOCKPILESINSTALLED WITHIN A 25-FOOT MINIMUM BUFFER OUTSIDE THE DRIP LINE OF TREES.2.DITCH PROTECTION (TEMPORARY OR PERMANENT)·THE LAST 200 FEET OF ANY DITCH CONNECTING TO A SURFACE WATER SHALL HAVE TEMPORARY ORPERMANENT STABILIZATION MEASURES IN PLACE WITHIN 24 HOURS OF DIRECT CONNECTION TO ASURFACE WATER. DITCHES MAY BE KEPT IN A "SMOOTH" ROUGH GRADED CONDITION IN ORDER TOPROPERLY INSTALL EROSION CONTROL SEEDING, MULCH, MATS AND BLANKETS.·STABILIZATION METHODS FOR DITCH BOTTOM WETTED PERIMETER MAY INCLUDE ONE OF THEFOLLOWING OR COMBINATIONS OF EROSION CONTROL BLANKET, MATS, RIP-RAP, BIO-ROLLS OR ROCKCHECK DAMS. THE METHOD CHOSEN WILL BE BASED ON AN ANALYSIS OF THE SLOPE AND VELOCITYOF THE RUNOFF. THESE ARE ADDITIONAL BMP'S WHICH MAY BE CONSIDERED FOR USE IF THE BMP'SIDENTIFIED IN THE EROSION CONTROL PLANS PROVE TO BE INSUFFICIENT. PAYMENT FOR THESE BMP'SMAY ONLY BE MADE IF PRIOR APPROVAL FROM AN OWNER HAS BEEN GIVEN.·WHERE DITCH GRADES EXCEED 5%, ROCK CHECK DAMS OR EQUIVALENT BMP SHALL BE INSTALLED.CHECK DAMS TO BE SPACED SO THAT THE CREST OF THE DOWNSTREAM DAM IS AT THE ELEVATION OFTHE TOE OF THE UPSTREAM DAM. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TOCONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THEGRADING CONTRACT.·ABOVE THE WETTED PERIMETER, THE DITCH WILL BE STABILIZED BY SEEDING AND MULCH AND/OREROSION CONTROL BLANKETS DEPENDING ON SIDE SLOPE STEEPNESS AND LENGTH.·ALL DITCHES WILL BE STABILIZED WITHIN 14 DAYS.3. WORK NEXT TO WETLANDS·PRESERVE A 100' FROM SPECIAL WATERS) NATURAL BUFFER, OR IF A BUFFER IS INFEASIBLE, PROVIDEREDUNDANT SEDIMENT CONTROLS PRIOR TO DISTURBANCE OF UP-GRADIENT AREAS.·FILL SLOPES ADJACENT TO WETLANDS SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS OFCOMPLETION OF WORK. INSTALL EROSION CONTROL BLANKET AS INDICATED ON THE EROSIONCONTROL / GRADING PLAN.4. LONG-STEEP CUT/FILL SLOPES·THERE WILL BE NO UNBROKEN SURFACE SLOPE LENGTHS OF GREATER THAN 75 FEET FOR SLOPES WITHA GRADE OF 3:1 OR STEEPER WITHIN 200 FEET OF SURFACE WATERS. ALL EXPOSED AREAS WITH ACONTINUOUS POSITIVE SLOPE WITHIN 200 FEET OF A SURFACE WATER WILL HAVE A TEMPORARY ORPERMANENT COVER YEAR ROUND. THE EXPOSED SOILS SHALL BE STABILIZED WITHIN 14 DAYS·PLANNED SLOPES OF 3:1 (H:V) OR STEEPER AND GREATER THAN 75 FT IN LENGTH WILL BE TEMPORARILYOR PERMANENTLY STABILIZED IN INCREMENTS NOT TO EXCEED 75 FT, PRIOR TO CONSTRUCTION ORDISTURBING A NEW INCREMENT.·LONG SLOPES SHOULD BE BROKEN INTO SHORTER LENGTHS BY INSTALLING STRAW BIOROLLS ININTERLOCKING HERRINGBONES AS SHOWN ON THE GRADING PLAN. IF TEMPORARY SEEDING ANDMULCH CAN NOT BE USED ON SLOPES STEEPER THAN 3:1, THEN THE SLOPE MAY BE COVERED WITHTARPS OR PLASTIC SHEETING. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TOCONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THEGRADING CONTRACT.·THE SOIL SURFACE ON RE-VEGETATED SLOPES WILL BE ROUGHENED USING ANY APPROPRIATEIMPLEMENT THAT CAN BE SAFELY OPERATED ON THE SLOPE, SUCH AS BULLDOZERS OR DISKS. THEGROOVES SHALL BE CREATED PERPENDICULAR TO THE SLOPE TO HELP ESTABLISH VEGETATIVE COVER,REDUCE RUNOFF VELOCITY, INCREASE INFILTRATION, AND PROVIDE FOR SEDIMENT TRAPPING.5.CULVERT INLET/OUTLET PROTECTION·SOD MAY BE PLACED AND ANCHORED AT CULVERT INLETS AS SHOWN ON THE GRADING PLAN, UNLESSVELOCITIES REQUIRE RIPRAP.·AT LEAST ONE 2-FOOT WIDE STRIP OF SOD OR FIBER BLANKET SHALL BE PLACED ALONG THE EDGES OFCULVERT HEADWALLS AND WINGWALLS AS SHOWN ON THE GRADING AND/OR UTILITY PLANS.·RIPRAP AT PIPE APRON OUTLETS WILL BE PLACED PRIOR TO BUT NO SOONER THAN 7 DAYS BEFOREAPRON IS INSTALLED. RIPRAP SHALL BE INSTALLED UNDER APRON LIP ACCORDING TO THE STANDARDDETAIL.6.STORM SEWER INLET PROTECTION·STORM DRAIN INLETS SHALL BE PROTECTED UNTIL THE DISTURBED AREAS THAT COULD DISCHARGE TOAN INLET HAVE BEEN STABILIZED.·INFRASAFE SEDIMENT CONTROL BARRIERS OR APPROVED EQUAL SHALL BE USED WHEN CASTINGS ARENOT IN PLACE AS INDICATED ON THE UTILITY PLAN AND AS APPROVED BY THE OWNER.·INFRASAFE DEBRIS COLLECTION DEVICE OR APPROVED EQUIVALENT SHALL BE USED WHEN CASTINGSARE IN PLACE AS INDICATED ON THE UTILITY PLAN AND AS APPROVED BY THE OWNER.·DOCUMENTATION IS NEEDED WITHIN 72 HOURS IF REMOVAL OF PROTECTION BMPS IS NEEDED DUE TOWINTER CONDITIONS OR FLOODING CONCERNS.7.STORM WATER POND OUTLETS·TEMPORARY OR PERMANENT ENERGY DISSIPATION MEASURES SHALL BE IN PLACE AT THE STORMWATER POND OUTLETS WITHIN 24 HOURS OF DIRECT CONNECTION TO A SURFACE WATER.·RIPRAP AT PIPE APRON OUTLETS WILL BE PLACED PRIOR TO APRON INSTALLATION AND SHALL BEINSTALLED UNDER THE APRON LIP.·POND EMERGENCY SPILLWAYS SHALL BE LINED BASED ON THE DESIGN DISCHARGE FLOW VELOCITYAND AS INDICATED ON GRADING AND/OR UTILITY PLANS.8.TEMPORARY SEDIMENT BASINS·TEMPORARY SEDIMENT BASINS WILL BE PROVIDED WHERE 10 OR MORE ACRES OF DISTURBED SOILDRAIN TO ACOMMON LOCATION. THE BASIN SIZE IS BASED ON RUNOFF FROM A 2-YEAR, 24 HOURSTORM, FOR EACH ACRE DRAINED TO THE BASIN. AT A MINIMUM, THE BASIN WILL PROVIDE 1800 CUBICFEET OF STORAGE FOR EACH ACRE DRAINED TO THE BASIN.·SEDIMENT BASINS WILL DETAIN WATER LONG ENOUGH TO SETTLE OUT AT LEAST 75 PERCENT OF THESEDIMENT. THE USE OF FLOCS MAY BE NECESSARY. THE DISCHARGE QUALITY SHALL BE EQUAL TO ORBETTER THAN THE RECEIVING WATER. THE TEMPORARY BASIN MAY BE DRAWN DOWN WITH A PUMP TOINCREASE CAPACITY FOR THE NEXT RAIN EVENT. TEMPORARY EROSION CONTROL DEVICES REQUIREDDUE TO CONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTALTO THE GRADING CONTRACT.·THE SEDIMENT PONDS WILL BE EXCAVATED TO MAINTAIN THE NECESSARY SEDIMENT CAPACITY ANDCONTAINMENT.··TEMPORARY SEDIMENT FOREBAYS WILL BE CONSTRUCTED TO CAPTURE SEDIMENT BEFORE IT ENTERSTHE POND, IF·NECESSARY.·THE SEDIMENT PONDS WILL BE MONITORED BY THE CONTRACTOR TO DETERMINE THE SEDIMENT LEVELIN THE POND.·WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE TEMPORARY BASIN REACHES ½ FULL (50% OF THESTORAGE VOLUME) THE BASIN SHALL BE DRAINED USING PUMPS AND ENERGY DISSIPATION ANDSEDIMENT REMOVAL SHALL BE COMPLETED WITHIN 72 HOURS OF DISCOVERY OF THE BASIN BEING 1/2FULL OF SEDIMENT, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. TEMPORARY EROSIONCONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIRCONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·TEMPORARY SEDIMENT BASINS WILL HAVE A STABILIZED EMERGENCY OVERFLOW AND CONTAINENERGY DISSIPATION AT BASIN OUTLET.9.DEEP UTILITIES: WATER AND SANITARY/GAS LINE·SILT FENCE OR A SIMILAR TYPE OF PERIMETER CONTROL SHALL BE PLACED DOWN GRADIENT OF THEEXCAVATED SOIL IF WORK IS DONE WITHIN 200 FEET OF WETLANDS OR STREAMS.·DISTURBANCE OF CHANNEL BANKS, WETLANDS, AND IMPORTANT VEGETATION AREAS SHALL BEMINIMIZED TO THE EXTENT POSSIBLE.·THE UTILITY CONSTRUCTION SITE SHALL BE SEEDED WITH A TEMPORARY·SEED MIX AND MULCH AFTER INSTALLATION IF THE SITE WILL BE IDLE FOR 7, 14, OR 21 DAYS DEPENDINGUPON SLOPES OF STEEPER THAN 3:1, 3:1 TO 10:1 AND FLATTER THAN 10:1 RESPECTIVELY.10.STOCKPILES (TEMPORARY AND PERMANENT)·LOCATE STOCKPILES A MINIMUM OF 100 FEET FROM CATCH BASIN INLETS, PONDS, AND SITE DRAINAGEROUTES PERIMETER CONTROLS SUCH AS SILT FENCE SHALL BE INSTALLED AROUND ALL STOCKPILES IFNOT PLACED WITHIN EXISTING SILT FENCES OR OTHER SEDIMENT CONTROL.·TEMPORARY SEED AND MULCH SHALL BE USED TO STABILIZE THE STOCKPILES AND THE STOCKPILESSHALL BE SHAPED TO FACILITATE SEEDING AND MINIMIZE EROSION AND SHALL BE SEEDED WITHIN 7DAYS. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OFSEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·IF TEMPORARY SEED AND MULCH CANNOT BE USED, THEN THE STOCKPILES SHALL BE COVERED WITHHYDROMULCH, TARPS OR PLASTIC SHEETING AS APPROVED BY THE OWNER.·IF STOCKPILES MUST BE PLACED WITHIN A CONVEYANCE A TEMPORARY BYPASS SHALL BE INSTALLED(I.E. PVC PIPE) TO ADEQUATELY CONVEY RUNOFF. TEMPORARY BYPASS BMPS SHALL BE INCIDENTAL TOTHE CONTRACT UNLESS PREVIOUSLY APPROVED BY THE OWNER / ENGINEER11.CONSTRUCTION DEWATERING·DURING DEWATERING ACTIVITIES, THE SEDIMENT LADEN WATER CANNOT BE DIRECTLY DISCHARGED TOSURFACE WATERS. OPTIONS FOR REDUCING THE TURBIDITY OF THE WATER INCLUDE:(TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OFSEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT):1.CONSTRUCT A TEMPORARY SEDIMENT TRAP FOR TURBID WATER DISCHARGE.2.USE A PORTABLE SEDIMENT TRAP SYSTEM.3.APPLY NATURAL BASED FLOCCULENT TECHNOLOGY SUCH AS CHITOSAN IN SEDIMENT TRAPS OR ASERIES OF DITCH CHECKS TO CONTAIN SEDIMENT.4.DISCHARGE THROUGH FIBERLOGS OR A ROCK WEEPER INTO A LARGE VEGETATIVE BUFFER AREA.5.PUMP TO A TEMPORARY SEDIMENT BASIN.6.ENERGY DISSIPATION WILL BE PROVIDED AT ALL DISCHARGE POINTS.7.DEWATERING OR BASIN DRAINING ACTIVITIES WILL NOT CAUSE EROSION IN RECEIVING CHANNELS ORADVERSELY IMPACT WETLANDS.8.ALL EROSION CONTROL OR SEDIMENT TRAPS REQUIRED FOR CONSTRUCTION DEWATERING SHALL BECONSIDERED INCIDENTAL TO THE CONSTRUCTION ACTIVITY REQUIRING DEWATERING.12.CONSTRUCTION ENTRANCES·A TEMPORARY CRUSHED ROCK OR WOOD CHIP PAD SHALL BE LOCATED WHERE VEHICLES LEAVE THECONSTRUCTION SITE.·THE CONSTRUCTION ENTRANCE PAD SHALL BE AT LEAST 50 FEET IN LENGTH.·GEOTEXTILE FABRIC MAY BE PLACED UNDER THE CRUSHED ROCK OR WOOD CHIPS TO PREVENTMIGRATION OF MUD FROM UNDERLYING SOIL INTO THE CONSTRUCTION ENTRANCE MATERIAL.·ROCK PADS SHALL BE CONSTRUCTED OF ROCK 1 TO 3 INCHES IN SIZE AND PLACED IN 6 INCH LAYERS.·CONSTRUCTION ENTRANCES SHALL BE INSPECTED AT LEAST EVERY 7 DAYS AND MAINTAINED ASNEEDED.·TRACKED SEDIMENTS SHALL BE REMOVED FROM PAVED SURFACES AT THE END OF EACH DAY USINGPICK-UP TYPE STREET SWEEPER.·IF TRACKING INTO ROADWAY BECOMES PROBLEMATIC THE ENTRANCE PADS SHALL BE LENGTHENED ORANOTHER TECHNIQUE APPLIED. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TOCONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THEGRADING CONTRACT.·THE CONSTRUCTION ENTRANCE SHALL BE MONITORED CLOSELY DURING WET CONDITIONS. IFTRACKING INTO ADJACENT ROADWAYS OCCURS, THE FREQUENCY OF STREET SWEEPING SHALL BEINCREASED.13.CONCRETE TRUCK WASHOUT·CONCRETE TRUCKS SHALL UTILIZE THE CONCRETE WASHOUT AREA SHOWN ON THE PLANS TO WASHAND RINSE THEIR EQUIPMENT PRIOR TO LEAVING THE SITE.·WASHOUT OF CONCRETE MIXER TRUCKS WILL BE PERFORMED IN THE DESIGNATED AREAS ONLY.·WASHOUTS WILL BE CONSTRUCTED AND MAINTAINED TO PROVIDE SUFFICIENT CONTAINMENT FOR ALLLIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS.·WASHOUTS SHALL BE CLEARLY MARKED ON SITE WITH SIGNAGE BY THE UTILITY CONTRACTOR WITHAPPROVAL FROM OWNER.·WASHOUTS SHALL BE LOCATED A MINIMUM OF 50 FEET FROM DRAINAGE FACILITIES ANDWATERCOURSES.·CONCRETE WASHOUT AREAS WILL HAVE AN IMPERMEABLE LINER TO PREVENT CONCRETE WASHOUTWATER FROM INFILTRATING/CONTACTING WITH SOIL.·IMPERMEABLE LINER INCLUDES 10 MIL POLYLINER OR COMPACTED CLAY LINER.·WASHOUT SYSTEMS CAN BE USED AS ALTERNATE WASHOUT AREAS.14.VEHICLE MAINTENANCE·ROUTINE MAINTENANCE OF VEHICLES AND EQUIPMENT SHALL OCCUR IN STAGING AREAS ONLY.·VEHICLE WASHING SHOULD BE AVOIDED. IF WASHING IS NECESSARY, RUNOFF FROM THE WASHINGWILL BE CONTAINED AND LIMITED TO A DEFINED AREA OF THE SITE. RUNOFF MUST BE CONTAINED ANDWASTE PROPERLY DISPOSED OF·ENGINE DEGREASING SHALL BE AVOIDED. IF DEGREASING IS NECESSARY, RUNOFF FROM THEOPERATION WILL BE CONTAINED IN A LINED SEDIMENT TRAP AND PROPERLY DISPOSED OF AT ATREATMENT FACILITY.·ALL REQUIRED SEDIMENT TRAPS AND CONTAINMENT FACILITIES AND PROPER DISPOSAL OF WASHWATER/DEGREASING AT A TREATMENT FACILITY SHALL BE INCIDENTAL TO THE CONSTRUCTIONCONTRACT.15.FUELING·ANY FUEL TANK OR TRUCK STORED ON THE PROJECT SITE SHALL BE PROTECTED BY A SECONDARYCONTAINMENT SYSTEM.·FUELING AREAS SHALL NOT BE WASHED OR RINSED WITH WATER SINCE THIS COULD CAUSE FUEL SPILLSTO BE DISCHARGED INTO STORM WATER SYSTEMS.·ABSORBENT MATERIALS SHALL BE AVAILABLE ON SITE FOR USE IN CLEANING UP SMALL SPILLS.·ALL REQUIRED FUEL CONTAINMENT AND CLEAN-UP MATERIALS AND THE PROPER DISPOSAL OF THEMATERIALS SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT.16.HAZARDOUS MATERIALS·HAZARDOUS MATERIALS SHALL BE PROPERLY STORED TO PREVENT VANDALISM OR UNAUTHORIZEDACCESS.·CONTAINMENT UNITS SHALL BE INSTALLED IN ACCORDANCE WITH FEDERAL, STATE, AND LOCALREGULATIONS.·MPCA STORING AND DISPOSAL REQUIREMENTS SHALL BE FOLLOWED FOR ALL HAZARDOUS WASTE.·NO HAZARDOUS MATERIAL SHOULD BE STORED WITHIN 200 FEET OF AN IDENTIFIED CRITICAL AREA.·ABSORBENT MATERIALS SHALL BE AVAILABLE FROM THE CONTRACTOR ON SITE FOR USE IN CLEANINGUP SMALL SPILLS.·IF BUILDING MATERIALS, CHEMICALS, OR GENERAL REFUSE IS BEING USED, STORED, DISPOSED OF, OROTHERWISE MANAGED INAPPROPRIATELY, THE CONTRACTOR SHALL CORRECT SUCH DEFECTS WITHIN24 HOURS OF DETECTION OR NOTIFICATION.·ALL REQUIRED CONTAINMENT / STORAGE UNITS / ABSORBENT MATERIAL AND REQUIRED DISPOSALSHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT.17.CHEMICAL CONTAINMENT·GASOLINE, OIL, PAINT, SOLVENTS, AND OTHER CHEMICALS NECESSARY FOR CONSTRUCTION ARE NOTALLOWED TO CONTACT THE GROUND SURFACE, BE EXPOSED TO GROUNDWATER OR BE RELEASED TOA SURFACE OR GROUNDWATER EXCEPT IN DE MINIMIS QUANTITIES.·ALL PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINER, WITH ORIGINAL LABELS STILL ATTACHED,UNLESS THE CONTAINER IS NOT RESEALABLE.·HAZARDOUS MATERIALS SHALL BE RETURNED TO THE HAZARDOUS MATERIAL STORAGE AREA AT THEEND OF EACH DAY.·AN EFFORT SHOULD BE MADE TO STORE ONLY ENOUGH PRODUCTS TO DO THE REQUIRED JOB.·THE CONTRACTOR SHALL PROVIDE TANKS OR BARRELS TO COLLECT LIQUID BYPRODUCTS THAT POSE APOLLUTION HAZARD.·THE POLLUTANTS SHALL BE REMOVED FROM THE SITE ON A WEEKLY BASIS AND DISPOSED OF INACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS.·ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY, IN ACCORDANCE WITH THEMANUFACTURE'S RECOMMENDED METHODS.·ALL REQUIRED CONTAINMENT / STORAGE UNITS / ABSORBENT MATERIAL AND REQUIRED DISPOSALSHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT·ALL STORAGE AREAS SHALL BE SECURED TO PREVENT UNAUTHORIZED ACCESS.18.SOLID WASTE·SOLID WASTE SHALL BE STORED IN APPROPRIATE CONTAINERS AND PROPERLY DISPOSED OF ON AREGULAR BASIS.·CONTAINERS SHALL BE COVERED TO PREVENT WIND BLOWING THE WASTE AROUND THE SITE.·MPCA DISPOSAL REQUIREMENTS WILL BE FOLLOWED FOR ALL SOLID WASTE.·SOLID WASTE STORAGE CONTAINERS AND PROPER DISPOSAL SHALL BE CONSIDERED INCIDENTAL TOTHE CONSTRUCTION CONTRACT.19.DUST CONTROL·THE CONTRACTOR SHALL USE A VARIETY OF DUST CONTROL INCLUDING BUT NOT LIMITED TO THEFOLLOWING:·RAPID STABILIZATION METHODS ON SLOPES·WATER ON ROADWAYS AND GRADED AREAS·ALTERNATIVES: IN THE FORM OF VEGETABLE POLYMERS, WATER AND CALCIUM CHLORIDE PETROLEUMEMULSION RESINS, OR ACRYLIC COPOLYMERS MAY ALSO BE USED.·ALL REQUIRED DUST CONTROL SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT AS PERSPECIFICATIONS.20.WINTER STABILIZATION·COVER EXPOSED SOILS ON OR AROUND NOV. 15TH AND/OR PRIOR TO TERMINATION OFCONSTRUCTION ACTIVITIES FOR WINTER·ALL EXPOSED SOILS TO BE COVERED WITH 2 TONS TYPE 1 MULCH·ALL EXPOSED SOILS TO BE SEEDED WITH MNDOT SEED MIX 150·ALL LOW POINTS IN ROADS TO BE ADEQUATELY DRAINED IN ACCORDANCE WITH NPDES DEWATERINGREQUIREMENTS PART IV. CONSTRUCTION ACTIVITY REQUIREMENTS. SECTION D. DEWATERING ANDBASIN DRAINING.·PERIMETER SILT FENCE OR OTHER CONTROLS TO BE INSTALLED 3-5 FEET FROM THE BACK OF THE CURBAND OUT OF THE PLOWED SNOW AREA.·PERIMETER CONTROLS AROUND PERMANENT STORMWATER BASINS TO BE INSTALLED AND MAINTAINED·INLET CONTROLS TO BE REMOVED ACCORDING TO LEGAL REQUIREMENTS WITH DOCUMENTATIONWITHIN 72 HOURS FROM LEGAL AUTHORITY.·IF WORK HAS OCCURRED NEAR OR IN STREAMS OR OTHER SURFACE WATERS, THE EXPOSED SOILSSHALL BE STABILIZED TO PROTECT AGAINST FLOODING AND SPRING RUNOFF TO THE 100-YR FLOODELEVATION.·ALL TEMPORARY AND PERMANENT STORMWATER BASINS AND SEDIMENT BASINS SHOULD HAVEOUTLETS AND STABILIZED EMERGENCY OVERFLOWS INSTALLED AS PER THE GRADING AND/OR UTILITYPLAN AND AT THE APPROVAL OF THE OWNER.21.NON-STORMWATER DEWATERING·HYDRANT FLUSHING: FLUSHING OF HYDRANTS WILL BE DISCHARGED·THROUGH TEMPORARY PIPES AS NECESSARY, ONTO IMPERVIOUS SURFACES OR TO STABILIZED ARESWITH ENERGY DISSIPATION AT THE DISCHARGE POINT. THE DISCHARGE SHOULD BE COLLECTED BY THESTORM WATER BASINS AND STORM SEWER SYSTEM.·POTABLE WATER DISCHARGE: ALL WATER LINES WILL BE FLUSHED USING HOSES AND DISCHARGEDONTO AN IMPERVIOUS SURFACE AND DIRECTED TO THE STORM SEWER INFRASTRUCTURE BYNON-EROSIVE MEANS.22.WORK NEAR OR IN IMPAIRED WATERS·EXPOSED SOILS MUST BE STABILIZED WITHIN 7 DAYS OF ACTIVITY TEMPORARILY OR PERMANENTLYCEASED.·TEMPORARY SEDIMENT BASIN NEEDED WITHIN AREAS 5 ACRE DISTURBANCE WITH COMMON POINT OFDISCHARGE.·IF WORK IS NEAR SPECIAL WATERS REFER TO APPENDIX A OF THE NPDES PERMIT FOR ADDITIONALNOTES AND REQUIREMENTS.·NO UNTREATED DEWATERING WILL TAKE PLACE AND DISCHARGE TO "IMPAIRED WATERS"·SEE PERMIT FOR ADDITIONAL NOTES AND REQUIREMENTS23.INFILTRATION/FILTRATION AREAS·FENCE OFF AREA PRIOR TO BEGINNING CONSTRUCTION.·EXCAVATION AREA SHALL TAKE PLACE AFTER CONTRIBUTING AREAS ARE AT FINAL GRADE ANDSTABILIZED.·DO NOT USE HEAVY/WHEELED EQUIPMENT IN FILTRATION AREA.·DIVERSIONS, REDUNDANT SEDIMENT AND EROSION CONTROLS MUST BE USED TO PROTECT AREA.·ENSURE 8 FT MAINTENANCE ACCESS IS ADEQUATE FOR AREA.·IF GRADING MUST OCCUR IN FILTRATION AREA, LEAVE GRADE 3 FT HIGH TEMPORARILY UNTIL AREA CANBE FINAL GRADED AND STABILIZED20 DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\CIVIL DETAILS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C8.0CIVIL DETAILS -UTILITY DETAILS1C8.02C8.03C8.04C8.05C8.06C8.021 DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\CIVIL DETAILS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C8.1CIVIL DETAILS -STORM SEWERDETAILS1C8.12C8.13C8.14C8.125C8.1RETENTION BASIN CONSTRUCTION SEQUENCING1.Install appropriate temporary erosion control devices to preventsediment from leaving or entering the practice during construction.2.All down-gradient perimeter sediment control bmp's must be inplace before any up gradient land disturbing activity begins.3.Perform continuous inspections of erosion control practices,especially after each rainfall event.4.Install all utilities (water, sanitary sewer, electric, natural gas,phone, fiber optic, etc) prior to setting final grade of basin.5.Rough grade the site.6.Complete, stabilize, and vegetate all other site improvements.7.Construct and vegetate basin following stabilization of contributingdrainage area. Ensure that critical elevations, such as underdraininvert (if applicable), aquatic bench, and invert of overflow structure(if present) are correct.8.Remove temporary erosion control devices after the contributingdrainage area is adequately vegetated.DEAD POOL VOLUME (>1,800 C.F. PER TRIBUTARY AREA, 3' MIN. TO 10' MAX. DEPTH)12WATER QUALITY VOLUMENURP DESIGN LEVEL 3 (WQV > 1.5" x REGULATED IMPERVIOUS AREA)WATER QUALITY VOLUME (WQV) ELEVATIONTOTAL STORAGE VOLUME ELEVATION992.50990.40988.30987.00TOP OF BASIN BERM993.00EMERGENCY SPILLWAYWQV ELEV.NWLREUSE SHUTOFF ELEV.1.30'2.10'13.00'BOTTOM OF BASIN3COMPACTED SUBGRADE (SEE STORMWATER MANUAL FOR SUBGRADE PREPARATION)3RETENTION BASIN GENERAL NOTES1.In the event that sediment is introduced into the basin during orimmediately following excavation, this material shall be removedfrom the basin prior to continuing construction.2.Design is based on the WQV draining within 48 hours maximum.MAX. 3L:1H SLOPERETENTION BASIN WITH STORMWATER REUSENOT TO SCALE984.002.10'8' WIDE MINIMUMMAINTENANCEACCESS BENCHAQUATIC BENCH(WIDTH VARIES,SEE GRADING PLAN)MAX. 3L:1H SLOPEOUTLET CONTROL STRUCTURE (OCS-100)NOT TO SCALEHOT-DIPPED GALVANIZEDGRATE IN 2 SECTIONS WITHHEAVY DUTY HINGES(HAALA INDUSTRIES SKIMMERGRATE OR APPROVED EQUAL)MINIMUM SLAB THICKNESSOF 6" FOR STRUCTURES 14'OR LESS IN DEPTHPRECAST CONCRETEWEIR WALLINFLOWO U T F L O WLOW RIM ELEVATION: 992.50TOP OF WEIR WALL: 991.206" ORIFICE: 990.40OUTLET INV. ELEV.: 987.30INLET INV. ELEV.: 988.30(& 4" ORIFICE)SECTIONPRECAST CONCRETEOUTLET STRUCTUREWATERSTOP GROUT RINGOR WATERTIGHT BOOTREQUIRED AT ALL PIPECONNECTIONSPRECAST MANHOLESTEPS (NEENAHR-1981-N ORAPPROVED EQUAL),12" OR 16" ON CENTER22 DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\CIVIL DETAILS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C8.2CIVIL DETAILS -STORM SEWERDETAILSREVE7001-110-042DWG NO.1 OF 1SHEET1:40SCALEDWG SIZEA3130 VERONA AVEBUFORD, GA 30518PHN (770) 932-2443FAX (770) 932-2490www.nyloplast-us.com8 IN - 36 IN TYPICAL INSTALLATION OPTIONSTITLEPROJECT NO./NAMEMATERIALDATEREVISED BY8-10-00DATEAWADRAWN BYTHIS PRINT DISCLOSES SUBJECT MATTER IN WHICHNYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPTOR POSSESSION OF THIS PRINT DOES NOT CONFER,TRANSFER, OR LICENSE THE USE OF THE DESIGN ORTECHNICAL INFORMATION SHOWN HEREINREPRODUCTION OF THIS PRINT OR ANY INFORMATIONCONTAINED HEREIN, OR MANUFACTURE OF ANYARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERSIS FORBIDDEN, EXCEPT BY SPECIFIC WRITTENPERMISSION FROM NYLOPLAST.11-2-18NMHDUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLASTTSALPOLYNDUCTILEIRONTSALPOLYNDUCTILEIRON DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST WHEN ARE DRAIN BASINS USED?2808AG _ _ X2810AG _ _ X2812AG _ _ X2815AG _ _ X2818AG _ _ X2824AG _ _ X2830AG _ _ X2836AG _ _ XWHEN ARE INLINE DRAINS USED?2708AG _ _ X2710AG _ _ X2712AG _ _ X2715AG _ _ X2718AG _ _ X2724AG _ _ X2730AG _ _ XTYPICAL INSTALLATIONSTYPICAL INSTALLATION OF NYLOPLASTDRAIN BASIN AND INLINE DRAIN1: TO ENTER AN EXISTING LINE USING A TEE & RISER2: AT THE BEGINNING OF A DRAIN LINE USING AN ELBOW & RISERTEEELBOW12" DRAIN BASIN(2) INLET & OUTLETADAPTERS CAN BEPUT ON ANY ANGLE1: TO CHANGE ELEVATION2: TO CHANGE PIPE DIAMETER3: TO CHANGE PIPE TYPE4: FOR SHALLOWAPPLICATIONS5: TO CHANGE DIRECTIONA°RISERDRAIN BASININLINE DRAIN10" INLINE DRAIN10" INLINE DRAIN(3) VARIABLE ELEVATIONWATERTIGHT ADAPTERS AVAILABLEFOR MOST COMMON PLASTIC PIPING SYSTEMS8"6"CORRUGATEDHDPE PIPESMOOTH WALLPVC1 - STRUCTURES & ADAPTERS AVAILABLE IN SIZES 8" - 36"2 - ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0° TO 360°, TO DETERMINE MINIMUM ANGLE BETWEEN ADAPTERS SEE DRAWING NO. 7001-110-0123 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING RESTRICTIONS SEE DRAWING NO. 7001-110-0654 - REDUCING CONES DOWN TO 30" DIAMETER WILL BE REQUIRED FOR 36" DRAIN BASINS.©2010 NYLOPLAST1C8.22C8.23C8.2REVF7001-110-111DWG NO.1 OF 1SHEET1:25SCALEDWG SIZEA3130 VERONA AVEBUFORD, GA 30518PHN (770) 932-2443FAX (770) 932-2490www.nyloplast-us.comDRAIN BASIN & INLINE DRAIN NON TRAFFIC INSTALLATIONTITLEPROJECT NO./NAMEMATERIALDATEREVISED BY9-30-99DATECJADRAWN BYTHIS PRINT DISCLOSES SUBJECT MATTER IN WHICHNYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPTOR POSSESSION OF THIS PRINT DOES NOT CONFER,TRANSFER, OR LICENSE THE USE OF THE DESIGN ORTECHNICAL INFORMATION SHOWN HEREINREPRODUCTION OF THIS PRINT OR ANY INFORMATIONCONTAINED HEREIN, OR MANUFACTURE OF ANYARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERSIS FORBIDDEN, EXCEPT BY SPECIFIC WRITTENPERMISSION FROM NYLOPLAST.03-11-16NMHDRAIN BASININLINE DRAINTHE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHERGRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I,CLASS II, OR CLASS III MATERIAL AS DEFINED IN ASTM D2321.BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BEPLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321.NON TRAFFIC INSTALLATIONTOP SOILGRATE/COVERTOP SOILGRATE/COVER©2011 NYLOPLAST4" MIN ON 8" - 24"6" MIN ON 30" & 36"THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHERGRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I,CLASS II, OR CLASS III MATERIAL AS DEFINED IN ASTM D2321.BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BEPLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321.REVD7003-110-057DWG NO.1 OF 1SHEET1:40SCALEDWG SIZEA3130 VERONA AVEBUFORD, GA 30518PHN (770) 932-2443FAX (770) 932-2490www.nyloplast-us.comINLINE DRAIN WITH DOME GRATEQUICK SPEC INSTALLATION DETAILTITLEPROJECT NO./NAMEMATERIALDATEREVISED BY03-25-10DATEEBCDRAWN BY03-15-16NMHMINIMUM PIPE BURIALDEPTH PER PIPEMANUFACTURERRECOMMENDATIONINVERT ACCORDING TOPLANS/TAKE OFFNYLOPLAST INLINE DRAIN WITH DOME GRATE8" - 30"1 - 8" - 30" DOME GRATES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05.2 - DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212 FOR CORRUGATED HDPE (ADS N-12/HANCOR DUAL WALL), N-12 HP, & PVC SEWER (4" - 24").3 - 8" - 30" DOME GRATES HAVE NO LOAD RATING(3) VARIOUS TYPES OF INLET & OUTLET ADAPTERSAVAILABLE: 4" - 30" FOR CORRUGATED HDPE(ADS N-12/HANCOR DUAL WALL, ADS/HANCORSINGLE WALL), N-12 HP, PVC SEWER (EX: SDR 35),PVC DWV (EX: SCH 40), PVC C900/C905,CORRUGATED & RIBBED PVCWATERTIGHT JOINT(CORRUGATED HDPE SHOWN)THIS PRINT DISCLOSES SUBJECT MATTER IN WHICHNYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPTOR POSSESSION OF THIS PRINT DOES NOT CONFER,TRANSFER, OR LICENSE THE USE OF THE DESIGN ORTECHNICAL INFORMATION SHOWN HEREINREPRODUCTION OF THIS PRINT OR ANY INFORMATIONCONTAINED HEREIN, OR MANUFACTURE OF ANYARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERSIS FORBIDDEN, EXCEPT BY SPECIFIC WRITTENPERMISSION FROM NYLOPLAST.©2013 NYLOPLAST(1) INTEGRATED DUCTILE IRONGRATE TO MATCH BASIN O.D.THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHERGRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I,CLASS II, OR CLASS III MATERIAL AS DEFINED IN ASTM D2321.BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BEPLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321.23 DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\CIVIL DETAILS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C8.3CIVIL DETAILS -SITE DETAILS1C8.32C8.33C8.34C8.35C8.36C8.37C8.38C8.324 DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\CIVIL DETAILS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C8.4CIVIL DETAILS -ADA DETAILS1C8.42C8.43C8.44C8.425 DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\CIVIL DETAILS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:1RPBCWD Rev-107.21.2025Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PE2RPBCWD Rev-207.29.2025C8.5CIVIL DETAILS-ADA DETAILS-CONTINUED1C8.51C8.526 606050 5050XXXXX XGMEMGMSIGN "STOP"SIGN "STOP"SIGN "NO PARKING"SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEBITUMINOUS TRAIL BITUMINOUS TRAILBITUMINOUS PARKING LOTSIGN "15MPH"TTCHAIN LINKFENCECABXCABX10 1010101010101010 10 10 10 10101050 DELRIODRIVE50 CABXROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)WOOD MULCHCONCRETESTAIRSROCK MULCH (TYP.)ROCK MULCH (TYP.)GRAVEL LOTDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITION#111-20" ash#113-10" spruce#114-28" maple#116-60" basswood, multi-stem#117-30" maple#1-boxelder, 3-stem(8,8,8)#2-13" boxelder#5-poplar, 2-stem(15,13)#3-boxelder, 3-stem(8,8,4)#6-poplar, 4-stem(20,20,20,10)#8-13" poplar#22-poplar, 2-stem(20,16)#23-poplar, 2-stem(24,12)#24-poplar, 2-stem(20,20)#25-poplar, 2-stem(10,6)#110-16" pine#109-30" maple#108-22" maple#107-26" maple#106-14" pine#4-boxelder, 4-stem(10,8,6,5)#12-10" boxelder#112-22 maple#105-22" pine#104-15" pine#102-14" pine#101-15" ash#100-14" ash#98-20" spruce#99-18" maple#103-16" pine#97-15" spruce#96-20" mapleHH#86-50" cottonwood#85-20" cottonwood#84-16" boxelder#83-14" boxelder#81-11" boxelder#82-20" crabapple#87-12" maple#88-ash, 2-stem(8,8)#89-22" maple#90 15" maple#91-16" maple#95-48" maple#94-18" maple#93-15" maple#92-15" maple#131-10" red cedar#133-12" cottonwood#132-10" red cedar#79-15" crabapple#80-12" crabapple#78-boxelder, 4-stem(8,8,6,6)#126-11" cottonwood#125-10" elm#124-10" red cedar#123-14" cottonwood#122-10 cottonwood#121-30" cottonwood#120-18" cottonwood#119-10" cottonwood#118-28" maple#26-poplar, 3-stem(20,14,14)#27-20" poplar#28-24" poplar#29-14" poplar#33-11" poplar#32-20" poplar#30-30" poplar#31-poplar, 2-stem(14,14)#7-18" poplar#9-boxelder, 2-stem(10,8)#10-poplar, 2-stem(42,13)#11-35' spruce#16-20" poplar#14-11" boxelder#13-60" cottonwood#15-11" boxelder#20-10" boxelder#19-26" poplar#18-24" poplar#17-24" poplar#37-10" boxelder#35-10" boxelder#36-10" boxelder#34-10" boxelder#48-10" boxelder#41-10" boxelder#21-boxelder, 3-stem(10,10,10)#38-10" boxelder#39-36" poplar#40-36" poplar#42-10" boxelder#43-14" boxelder#44-16" boxelder#51-11" boxelder#52-10" boxelder#53-12" boxelder#54-11" boxelder#55-10" ash#45-11" boxelder#47-14" boxelder#46-10" boxelder#49-11" boxelder#50-silver maple, 5-stem(12,12,9,6,4)#59-10" maple#60-silver maple, 4-stem(18,16,10,8)#70-26" silver maple#58-10 ash#56-10" ash#57-10" ash#61-basswood, 4-stem(8,8,6,4)#63-12" crabapple#62-10" boxelder#64-14" ash#65-10" ash#66-10" ash#67-12" ash#74-10" boxelder#73-14" boxelder#68-silver maple, 3-stem(8,5,4)#69-16" silver maple#71-15" maple#72-15" maple#75-12" elm#76-14" ashGM#127-12" cottonwood#128-cottonwood, 2-stem(10,8)#129-10" maple#130-15" cottonwood#77-15' red cedar8.00N16°56'27"EL=137.87meas.(137.88plat)R=474.00Δ=16°39'56"meas.(16°40'00"plat)N89°43'33"W 78.00N00°16'27"E 513.79N89°11'28"W 174.96N53°31'23"W 254.72N00°20'03"E 252.00 L=219.05R=171.00Δ=73°23'36"995 991991991992993994995996997991990 991 992 993 994 990 989 989 996 996994992995996994993WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.60LODLODLODLODLOD LODLODL O D LODLODLOD LODLODLODLODLOD LODL O D LODLODLODLODLODLODLODLODLOD LOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLOD LODLOD LODLODLO D L O D LODLODLODLODLODLOD LODLODL O D LOD LOD LO DLOD LODLODL O D LOD LOD LODLOD LOD LOD LODLODLOD LODLODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLOD LOD LOD LOD LOD LOD LOD LODLOD DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\TREE PRESERVATION PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalLandscape Architect under thelaws of the State of Minnesota.1RPBCWD Rev-107.21.2025Sheet:XX.XX.XX53234Joshua J McKinney, PLAN O T F O R C O N S T R U C T I O N2RPBCWD Rev-207.29.2025L0.1TREE PRESERVATIONPLAN - TREEINVENTORYTREE IDENTIFICATIONSCALE IN FEET0603027 606050 5050XXXXX XGMEMGMSIGN "STOP"SIGN "STOP"SIGN "NO PARKING"SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEPID: 257620010OWNER: CHANHASSEN CITYBITUMINOUS TRAIL BITUMINOUS TRAILBITUMINOUS PARKING LOTSIGN "15MPH"TTCHAIN LINKFENCECABXCABX10 1010101010101010 10 10 10 10101050 DELRIODRIVE50 CABXROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)WOOD MULCHCONCRETESTAIRSROCK MULCH (TYP.)ROCK MULCH (TYP.)GRAVEL LOTDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITION#111-20" ash#113-10" spruce#114-28" maple#116-60" basswood, multi-stem#117-30" maple#1-boxelder, 3-stem(8,8,8)#2-13" boxelder#5-poplar, 2-stem(15,13)#3-boxelder, 3-stem(8,8,4)#6-poplar, 4-stem(20,20,20,10)#8-13" poplar#22-poplar, 2-stem(20,16)#23-poplar, 2-stem(24,12)#24-poplar, 2-stem(20,20)#25-poplar, 2-stem(10,6)#110-16" pine#109-30" maple#108-22" maple#107-26" maple#106-14" pine#4-boxelder, 4-stem(10,8,6,5)#12-10" boxelder#112-22 maple#105-22" pine#104-15" pine#102-14" pine#101-15" ash#100-14" ash#98-20" spruce#99-18" maple#103-16" pine#97-15" spruce#96-20" mapleHH#86-50" cottonwood#85-20" cottonwood#84-16" boxelder#83-14" boxelder#81-11" boxelder#82-20" crabapple#87-12" maple#88-ash, 2-stem(8,8)#89-22" maple#90 15" maple#91-16" maple#95-48" maple#94-18" maple#93-15" maple#92-15" maple#131-10" red cedar#133-12" cottonwood#132-10" red cedar#79-15" crabapple#80-12" crabapple#78-boxelder, 4-stem(8,8,6,6)#126-11" cottonwood#125-10" elm#124-10" red cedar#123-14" cottonwood#122-10 cottonwood#121-30" cottonwood#120-18" cottonwood#119-10" cottonwood#118-28" maple#26-poplar, 3-stem(20,14,14)#27-20" poplar#28-24" poplar#29-14" poplar#33-11" poplar#32-20" poplar#30-30" poplar#31-poplar, 2-stem(14,14)#7-18" poplar#9-boxelder, 2-stem(10,8)#10-poplar, 2-stem(42,13)#11-35' spruce#16-20" poplar#14-11" boxelder#13-60" cottonwood#15-11" boxelder#20-10" boxelder#19-26" poplar#18-24" poplar#17-24" poplar#37-10" boxelder#35-10" boxelder#36-10" boxelder#34-10" boxelder#48-10" boxelder#41-10" boxelder#21-boxelder, 3-stem(10,10,10)#38-10" boxelder#39-36" poplar#40-36" poplar#42-10" boxelder#43-14" boxelder#44-16" boxelder#51-11" boxelder#52-10" boxelder#53-12" boxelder#54-11" boxelder#55-10" ash#45-11" boxelder#47-14" boxelder#46-10" boxelder#49-11" boxelder#50-silver maple, 5-stem(12,12,9,6,4)#59-10" maple#60-silver maple, 4-stem(18,16,10,8)#70-26" silver maple#58-10 ash#56-10" ash#57-10" ash#61-basswood, 4-stem(8,8,6,4)#63-12" crabapple#62-10" boxelder#64-14" ash#65-10" ash#66-10" ash#67-12" ash#74-10" boxelder#73-14" boxelder#68-silver maple, 3-stem(8,5,4)#69-16" silver maple#71-15" maple#72-15" maple#75-12" elm#76-14" ashGM#127-12" cottonwood#128-cottonwood, 2-stem(10,8)#129-10" maple#130-15" cottonwood#77-15' red cedar8.00N16°56'27"EL=137.87meas.(137.88plat)R=474.00Δ=16°39'56"meas.(16°40'00"plat)N89°43'33"W 78.00N00°16'27"E 513.79N89°11'28"W 174.96N53°31'23"W 254.72N00°20'03"E 252.00 L=219.05R=171.00Δ=73°23'36"WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.60HYD D2 STORYMULTIFAMILY12 UNITSFFE: 995.00GFE: 994.832 STORYMULTIFAMILY16 UNITSFFE: 996.00GFE: 995.83HYD DDSTORMWATER RETENTION(NURP) BASINS±44,590 C.F. COMBINEDTOTAL LIVE STORAGE±8,590 C.F. COMBINEDTOTAL DEAD STORAGETOP BERM: 993.00E.O. SPILLWAY: 992.50HWL: 992.06WQVE: 990.40NWL: 988.30RE-USE SHUTOFF: 987.00BOTTOM: 984.00DLODLODLODLODLOD LODLODL O D LODLODLOD LODLODLODLODLOD LODL O D LODLODLODLODLODLODLODLODLOD LOD LODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLOD LODLOD LODLODLO D L O D LODLODLODLODLODLOD LODLODL O D LOD LOD LO DLOD LODLODL O D LOD LOD LODLOD LOD LOD LODLODLOD LODLODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLOD LOD LOD LOD LOD LOD LOD LODLOD DescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\TREE PRESERVATION PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalLandscape Architect under thelaws of the State of Minnesota.1RPBCWD Rev-107.21.2025Sheet:XX.XX.XX53234Joshua J McKinney, PLAN O T F O R C O N S T R U C T I O N2RPBCWD Rev-207.29.2025L0.2TREE PRESERVATIONPLANLEGENDTREE PROTECTION FENCE DETAILSCALE IN FEET06030TREE PRESERVATION CALCULATIONSSITE AREA:3.85 ACEXISTING SITE TREE COVERAGE AREA1.22 ACEXISTING SITE TREE COVERAGE PERCENTAGE31.6%BASE LINE TREE COVERAGE (PER TABLE 18-61-2b)20%TREE CANOPY ACREAGE TO REMAIN.44 ACTREE CANOPY PERCENTAGE TO REMAIN11.43%TOTAL TREES REQUIRED TO MITIGATE FOR TREE LOSS:20% x 3.85 ACRES = .77 ACRES.77 ACRES - .44 ACRES = .33 ACRES (14,375 SF)14,375 x 2 / 1,089 = 26.427 TREES REQUIRED FOR MITIGATIONMAINTAIN EXISTINGGRADE WITH THE TREEPROTECTION FENCEUNLESS OTHERWISEINDICATED ON THEPLANS.2" X 6' STEEL POSTSOR APPROVED EQUAL.5" THICKLAYER OF MULCH.NOTES:1- LOCATE FENCING PER TREEPROTECTION & EROSION CONTROLPLANS.2- NO PRUNING SHALL BE PERFORMEDEXCEPT BY APPROVED ARBORIST.3- NO EQUIPMENT SHALL OPERATEINSIDE THEPROTECTIVE FENCING INCLUDINGDURING FENCEINSTALLATION AND REMOVAL.SECTION VIEWKEEP OUTTREEPROTECTIONAREATREE PROTECTIONFENCE: 48" HIGH DENSITYPOLYETHYLENE FENCINGWITH 3.5" X 1.5"OPENINGS; COLOR-ORANGE. STEEL POSTSINSTALLED AT 8' O.C.TREE PROTECTION FENCE/ LIMITS OF DISTURBANCETREES TO BE REMOVEDLODEXISTING TREE CANOPYTREE CANOPY TO REMAINTREE CANOPY TO BE REMOVED28 UEUEUEUEUEUEUEUEUEUEUEUEUE UE UE UEUE UE UE UE UEUEUEUE UE UE UE UE U E UEGGGGGG G G G GGGG GGGGGGGGG GGGGGGGGXXXXXXGMEMGMSIGN "STOP"SIGN "STOP"SIGN "NO PARKING"SARATOGA DRIVELAREDO DRIVE SANTAVERA DRIVEPID: 257620010OWNER: CHANHASSEN CITYBITUMINOUS TRAIL BITUMINOUS TRAILBITUMINOUS PARKING LOTSIGN "15MPH"TTCHAIN LINKFENCECABXCABX10 10101010101010101010 10 101010DELRIODRIVECABXROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)ROCK MULCH (TYP.)WOOD MULCHCONCRETESTAIRSROCK MULCH (TYP.)ROCK MULCH (TYP.)GRAVEL LOTDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITIONDrainage and Utility Easement perSARATOGA 3RD ADDITION#111-20" ash#113-10" spruce#114-28" maple#116-60" basswood, multi-stem#117-30" maple#110-16" pine#109-30" maple#108-22" maple#107-26" maple#106-14" pine#112-22 maple#105-22" pine#104-15" pine#102-14" pine#101-15" ash#100-14" ash#98-20" spruce#99-18" maple#103-16" pine#97-15" spruce#96-20" mapleHH#86-50" cottonwood#85-20" cottonwood#84-16" boxelder#83-14" boxelder#87-12" maple#88-ash, 2-stem(8,8)#89-22" maple#90 15" maple#91-16" maple#95-48" maple#92-15" maple#126-11" cottonwood#118-28" maple#7-18" poplar#14-11" boxelder#13-60" cottonwood#15-11" boxelder#20-10" boxelder#41-10" boxelder#21-boxelder, 3-stem(10,10,10)#38-10" boxelder#42-10" boxelder#43-14" boxelder#44-16" boxelder#51-11" boxelder#52-10" boxelder#53-12" boxelder#54-11" boxelder#56-10" ash#57-10" ash#61-basswood, 4-stem(8,8,6,4)#63-12" crabapple#62-10" boxelder#64-14" ash#65-10" ash#66-10" ash#67-12" ash#74-10" boxelder#73-14" boxelder#68-silver maple, 3-stem(8,5,4)#71-15" maple#72-15" mapleGM#127-12" cottonwood#128-cottonwood, 2-stem(10,8)#129-10" maple8.00N16°56'27"EL=137.87meas.(137.88plat)R=474.00Δ=16°39'56"meas.(16°40'00"plat)N89°43'33"W 78.00N00°16'27"E 513.79N89°11'28"W 174.96N53°31'23"W 254.72N00°20'03"E 252.00 L=219.05R=171.00Δ=73°23'36"WEST FFE: 1000.00EAST FFE: 996.00EGRESS WINDOWLOWEST OPENING: 994.60HYD D2 STORYMULTIFAMILY12 UNITSFFE: 995.00GFE: 994.832 STORYMULTIFAMILY16 UNITSFFE: 996.00GFE: 995.83HYD DDD4" EDGING(TYP.)4" EDGING(TYP.)1AF6SX224SX4QB1GT1WP6UA1PT23PT21GT3WP1GT5PT216HX85DL3HP17DL8HP32DL13HX814NX6HP1AC1AF6SX210NX5CX18NX8HP1AC1GT14NX6HP1AC14NX6HP1AC5CX8NX5HP7SX5SX22BP29SX245CX35SX15NX7HP5SX214NX6HP1AC10HX88HP26DL5DL15HX83PA24" EDGING(TYP.)CONCRETESTAIRS5AF3GTDescriptionRev.DateSANTA VERA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-100PMJM04/04/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Santa Vera Apartments\CAD\Sheets\LANDSCAPE PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalLandscape Architect under thelaws of the State of Minnesota.1RPBCWD Rev-107.21.2025Sheet:XX.XX.XX53234Joshua J McKinney, PLAN O T F O R C O N S T R U C T I O N2RPBCWD Rev-207.29.2025L1.0LANDSCAPE PLANLANDSCAPE NOTES1.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIESAS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND LIMITEDMEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION SHALL NOT BE RELIED ON AS BEING EXACT ORCOMPLETE. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY THEOWNER OR ENGINEER OF DISCREPANCIES.2.ALL SANITARY SEWER, STORM SEWER AND WATER MAIN MATERIAL AND INSTALLATIONS SHALL BE PER CITYREQUIREMENTS, MINNESOTA PLUMBING CODE, AND IN ACCORDANCE WITH THE CURRENT EDITION OF"STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION AND SANITARY SEWER ANDSTORM SEWER INSTALLATION" AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA.3.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN THE NECESSARY FEDERAL, STATE AND LOCALPERMITS FOR THE PROPOSED WORK OR VERIFY WITH THE OWNER OR ENGINEER THAT PERMITS HAVE BEENOBTAINED. PERMIT FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISESCALE IN FEET06030LANDSCAPE REQUIREMENTSTREES PLANTEDOVERSTORY TREESCONIFEROUS TREESORNAMENTAL TREESTOTAL TREESPARKING LOT PLANTINGAREA REQUIREMENTREQUIREDPROPOSED27357547LANDSCAPING REQUIRED:·27 TREES ARE REQUIRED FOR MITIGATION- SEE L0.1·LANDSCAPING MUSE MEET 1% OF PROJECT BUDGET (Sec. 20-1179)·8% MINIMUM PARKING LOT LANDSCAPE AREA (20-1181)8%15.88%SYMBOLCODECOMMON / BOTANICAL NAMESIZETYPEQTYTREESUAAMERICAN ELM / ULMUS AMERICANA `PRINCETON`B & B2.5"CAL6PT2QUAKING ASPEN / POPULUS TREMULOIDESB & B2.5"CAL9AFSIENNA GLEN MAPLE / ACER FREEMANII `SIENNA GLEN`B & B2.5"CAL7GTSKYLINE HONEY LOCUST / GLEDITSIA TRIACANTHOS `SKYLINE`B & B2.5"CAL7QBSWAMP WHITE OAK / QUERCUS BICOLORB & B2.5"CAL4BP2WHITESPIRE BIRCH / BETULA PAPYRIFERA `WHITESPIRE`B & B2.5"CAL2CONIFERSPA2NORWAY SPRUCE / PICEA ABIESB & B3WPWHITE PINE / PINUS STROBUSB & B4ORN. TREESACAUTUMN BRILLIANCE SERVICEBERRY / AMELANCHIER CANADENSIS `AUTUMN BRILLIANCE`B & B2"CAL5CODECOMMON / BOTANICAL NAMESIZETYPEQTYSHRUBSDLDWARF BUSH HONEYSUCKLE / DIERVILLA LONICERA5 GAL85SX2LILAC / SYRINGA X `BLOOMERANG`5 GAL31HPLITTLE LIME HYDRANGEA / HYDRANGEA PANICULATA `JANE`5 GAL63GRASSESCXFEATHER REED GRASS / CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER`1 GAL55PERENNIALSSXAUTUMN FIRE SEDUM / SEDUM X `AUTUMN FIRE`1 GAL66HX8PLANTAIN LILY / HOSTA X `SUM AND SUBSTANCE`1 GAL54NXWALKERS LOW CATMINT / NEPETA X FAASSENII `WALKERS LOW`1 GAL107SYMBOLCODECOMMON / BOTANICAL NAMEQTYGROUND COVERSMS8FORMERLY MNDOT SEED MIX 33-261 / MNDOT SEED MIX WET DITCH8,868 SFTSSOD / TURF SOD HIGHLAND SOD36,830 SFPLANT SCHEDULE29 REPORT www.transportationcollaborative.com To: Josh McKinney, PLA, Principal Measure Group From: Matt Pacyna, PE, Principal Transportation Collaborative & Consultants, LLC Date: July 18, 2025 Subject: Santa Vera Residential Development Traffic Study; Chanhassen, MN INTRODUCTION TC2 completed a traffic study for the proposed Santa Vera residential development in the City of Chanhassen. The subject site, shown in Figure 1, is generally bound by City Center Park to the west, Saratoga Drive to the north, Laredo Drive to the east, and Chanhassen Elementary School to the south. The project is a 28-unit apartment / townhome development, which is immediately south of an existing 18-unit apartment complex. The main objectives of the study are to quantify existing traffic operations within the study area, evaluate potential impacts of the proposed development, and recommend improvements, if necessary, to ensure safe and efficient operations for all users. The following study assumptions, methodology, and findings are offered for consideration. Figure 1 Subject Site Subject Site Laredo Dr Kerber Blvd Del Rio Dr 78th St Powers Blvd (CR 17) 76th St Market Blvd 30 Santa Vera Residential Development Traffic Study July 18, 2025 Page 2 EXISTING CONDITIONS Existing conditions were reviewed within the study area to establish current traffic conditions to help determine impacts associated with the proposed development. The evaluation of existing conditions included collecting traffic volumes, observing transportation characteristics, reviewing crash history, and analyzing intersection capacity, which are described in the following sections. Traffic Volumes Vehicular intersection turning movement and pedestrian / bicyclist counts were collected on Wednesday March 26, 2025. The counts were generally collected from 7 to 9 a.m. and 4 to 6 p.m. with 13-hour counts (i.e., 6 a.m. to 7 p.m.) at the Kerber Boulevard / Santa Vera Drive and Laredo Drive / Saratoga Drive intersections. • Kerber Boulevard and Santa Vera Drive • Santa Vera Drive / Saratoga Circle and Saratoga Drive • Laredo Drive and Saratoga Drive • Laredo Drive and Del Rio Drive To illustrate how traffic volumes at study area intersections vary throughout the day, the traffic volume profiles by time-of-day are illustrated in Figure 2. Note that the adjacent Chanhassen Elementary School starts at 7:45 a.m. and ends at 2:15 p.m. Figure 2 Intersection Volume by Time of Day Transportation Characteristics Observations were conducted within the study area to identify various transportation characteristics such as roadway geometry, traffic controls, speed limits, and multimodal facilities. A general overview of key roadways within the study area is as follows: • Kerber Boulevard – a 2-lane undivided major collector roadway with multimodal facilities along both sides of the roadway. The speed limit is 40-mph with a 20-mph school zone speed limit near the elementary school. • Laredo Drive – a 2-lane undivided local roadway with a sidewalk along the west side of the roadway; the speed limit is 30-mph with a 15-mph school zone speed limit near the elementary school. All other study area roadways are 2-lane local roadways with limited multimodal facilities and a 30-mph speed limit. Each study intersection has side-street stop control. Existing geometrics, traffic controls, and volumes within the study area are shown in Figure 3. 0 50 100 150 Intersection VolumeKerber Blvd / Santa Vera Dr Laredo Dr / Saratoga Dr 31 550 550 700 650 1 5 0 300800303,7504, 0 0 0 1,300Figure 3Existing Conditions Santa Vera Residential Development Traffic Study Legend AM Peak Hour VolumePM Peak Hour VolumeEstimated ADT VolumeStop Sign XXX(XXX)X,XXX NKerber BlvdSanta V e r a D r Saratoga DrLaredo DrDel Rio Dr 0 (0)0 (0)0 (0) 0 (2)0 (0)16 (12)0 (0)20 (63)2 (9)0 (0)63 (42)1 (2)11 (16)149 (132)5 (3)9 (13)42 (200)4 (21)3 (3)9 (11)12 (13)8 (12)20 (5)12 (11)0 ( 0 ) 2 ( 1 ) 25 (28)1 (3) 24 (26)0 (0)0 ( 0 ) 8 ( 2 ) 4 ( 2 ) 0 ( 0 ) 3 ( 5 ) 17 ( 2 4 )1 (2)1 (1)23 (25)0 (0)3 (0)0 (1) 1 (10)30 (18)8 (19)11 (43) 12 (10)31 (24) 0 (0)3 (2)1 (3)19 (62) 0 (0)61 (42) 1,10032 Santa Vera Residential Development Traffic Study July 18, 2025 Page 4 Crash History Five (5) years of crash history were reviewed from 2020 through 2024 using MnDOT’s Crash Mapping Analysis Tool (MnCMAT), which identified two (2) intersection-related crashes within the study area. One (1) crash occurred at the Santa Vera Dr / Chippewa Trail intersection and one (1) at the Laredo Drive / 76th Street intersection. Neither crash resulted in a serious injury. Thus, there does not appear to be any existing safety issues in the study area from a crash frequency or severity perspective. Intersection Capacity Intersection capacity was evaluated using Synchro / SimTraffic Software (version 11), which uses methods outlined in the Highway Capacity Manual, 6th Edition. The software is used to develop calibrated models that simulate observed traffic operations, account for peaking characteristics, and identify key metrics such as intersection Level of Service (LOS) and queues. These models incorporate collected traffic, pedestrian, and bicyclist volumes, traffic controls, heavy commercial vehicle activity (i.e., buses and trucks), and driver behavior factors. Level of Service (LOS) quantifies how an intersection is operating. Intersections are graded from LOS A to LOS F, which corresponds to the average delay per vehicle values shown. An overall intersection LOS A though LOS D is generally considered acceptable in the study area. LOS A indicates the best traffic operation, while LOS F indicates an intersection where demand exceeds capacity. For side-street stop-controlled intersections, special emphasis is given to providing an estimate for the level of service of the side-street approach. Traffic operations at an unsignalized intersection with side- street stop control can be described in two ways. First, consideration is given to the overall intersection level of service, which accounts for the total number of vehicles entering the intersection and the capability of the intersection to support the volumes. Second, it is important to consider the delay on the minor approach. Since the mainline does not have to stop, most delay is attributed to the side-street approaches. It is typical of intersections with higher mainline traffic volumes to experience high-levels of delay (i.e., poor levels of service) on the side-street approaches, but an acceptable overall intersection level of service during peak hour conditions. Results of the existing intersection capacity analysis, shown in Table 1, indicate that all study intersections and approaches operate at an acceptable LOS B or better during the typical weekday a.m. and p.m. peak hours. In addition, peak queues at the study intersections range from about one (1) to two (2) vehicles. Note that there is increased activity for a short-duration (i.e., approximately 15 minutes) near the start / end times associated with the adjacent Chanhassen Elementary School. However, this increased activity does not significantly impact the study intersections or their operations. Thus, there are no significant existing operational issues from an intersection capacity perspective. Level of Service Average Delay / Vehicles Stop, Yield, and Roundabout Intersections Signalized Intersections A < 10 seconds < 10 seconds B 10 to 15 seconds 10 to 20 seconds C 15 to 25 seconds 20 to 35 seconds D 25 to 35 seconds 35 to 55 seconds E 35 to 50 seconds 55 to 80 seconds F > 50 seconds > 80 seconds 33 Santa Vera Residential Development Traffic Study July 18, 2025 Page 5 Table 1 Existing Intersection Capacity Study Intersection Traffic Control Level of Service (Delay) AM Peak Hour PM Peak Hour Kerber Boulevard and Santa Vera Drive SSS A / B (12) A / B (12) Santa Vera Drive and West Site Access SSS A / A (9) A / A (9) Santa Vera Drive / Saratoga Circle and Saratoga Drive SSS A / B (10) A / A (9) Laredo Drive and Saratoga Drive SSS A / A (9) A / A (9) Laredo Drive and East Site Access SSS A / A (9) A / A (9) Laredo Drive and Del Rio Drive SSS A / B (10) A / A (9) SSS – Side-Street-Stop PROPOSED DEVELOPMENT The project site is generally bound by City Center Park to the west, Saratoga Drive to the north, Laredo Drive to the east, and Chanhassen Elementary School to the south. The proposed development is a 28-unit apartment / townhome development, which is immediately south of an existing 18-unit apartment complex. If approved, the site would have a total of 46 units (18-existing, 28-proposesd). For study purposes, the project was assumed to be open to residents in the year 2027. Access to the proposed development is planned via the existing driveways along Santa Vera Drive and Laredo Drive to the apartments, as well as one (1) new access to Laredo Drive across from Del Rio Drive. Six (6) of the new units would utilize the existing apartment driveways, while the other 22-units would utilize the new driveway across from Del Rio Drive. Sidewalk connections are planned to the existing City Center Park trail to the west, as well as the sidewalk along the west side of Laredo Drive. 34 Santa Vera Residential Development Traffic Study July 18, 2025 Page 6 TRAFFIC FORECASTS Traffic forecasts were developed for year 2028 build conditions, which represents one-year after opening. The traffic forecasts account for general background growth and trip generation from the proposed development. The following information summarizes the traffic forecast development process. Background Growth To account for general background growth in the study area, an annual growth rate of one (1) percent was applied to the existing traffic volumes to develop year 2028 background traffic forecasts. Note that historical ADT volumes within the study area have been steady or decreasing over the last 10+ years. Therefore, the assumed growth rate provides a relatively conservative estimate for analysis purposes. Development Trip Generation A trip generation estimate for the proposed development was created using the ITE Trip Generation Manual, 11th Edition, which includes trips for typical weekday a.m. and p.m. peak hours, as well as daily. The proposed development, shown in Table 2, is estimated to generate 32 a.m. peak hour (8 in / 24 out), 33 p.m. peak hour (21 in / 12 out), and 256 daily (128 in / 128 out) trips. No modal reductions were applied to provide a more conservative estimate. Note that the average trip rates for a low-rise multi-family residential unit represent 0.4 trips / unit during the a.m. peak hour, 0.51 trips / unit during the p.m. peak hour, and 6.74 trips / unit per day. Table 2 Trip Generation Summary Land Use Type (ITE Code) Size AM Peak Hour PM Peak Hour Daily In Out In Out Existing Apartments (220) 18 units 2 5 6 3 122 Proposed: Multifamily Housing: Low-Rise (220) * 28 units 8 24 21 12 256 Total Site Trips 77 units 10 29 27 15 378 * Based on ITE fitted curve calculation. Site generated trips for the proposed development were distributed throughout the study area using the directional distribution shown in Figure 4, which is based on a combination of existing area travel patterns, the planned driveways, and engineering judgment. Figure 4 also shows the proposed development site trips at the study intersections. The resultant year 2028 build condition traffic forecasts are illustrated in Figure 5. YEAR 2028 BUILD CONDITIONS To understand impacts associated with the proposed development, a future intersection capacity analysis was completed for year 2028 build conditions. Results of the year 2028 build capacity analysis shown in Table 3 indicate that that all study intersections and approaches will continue to operate at an acceptable LOS B or better during the typical weekday a.m. and p.m. peak hours. Minimal change to intersection delays and queues are expected, which is a result of the relatively low trip generation of the proposed development and the reserve capacity within the adjacent roadway network. No operational issues are expected as a result of the proposed development from an intersection capacity perspective. 35 Figure 4Site Generated Trips Santa Vera Residential Development Traffic Study +15060% +105 +25+40+4 01 (3)0 (0)0 (0)1 (3)0 (0)0 (0)0 (0)1 (2)0 (0)3 (2)3 (1)3 (2)15% 10% 15% Legend AM Peak Hour Site TripsPM Peak Hour Site TripsADT Site TripsStop SignDirectional Distribution XXX(XXX)+XXX N 0 ( 0 ) 2 ( 2 ) 2 (6)1 (2) 7 (3)0 (0)0 ( 0 ) 0 ( 0 ) 0 ( 0 ) 0 ( 0 ) 0 ( 0 ) 7 ( 3 )0 (0)0 (0)2 (6)0 (0)0 (0)0 (0) 0 (0)2 (6)7 (3)0 (0) 0 (0)0 (0) 0 (0)3 (1)1 (3)7 (3) 0 (0)2 (9) 7 (3)0 (0)12 (6) 0 (0)0 (0)0 (0)4 (10)1 (3)0 (0)2 (6)3 (1)0 (0)36 670 650 825 695 1 5 5 310825303,9004, 1 5 0 1,500Figure 5Year 2028 Build Conditions Santa Vera Residential Development Traffic Study Legend AM Peak Hour VolumePM Peak Hour VolumeEstimated ADT VolumeStop Sign XXX(XXX)X,XXX NKerber BlvdSanta V e r a D r Saratoga DrLaredo DrDel Rio Dr12 (20)154 (136)5 (3)11 (16)43 (206)4 (22)3 (3)10 (13)12 (13)11 (14)24 (6)15 (14)0 ( 0 ) 4 ( 3 ) 28 (35)2 (5) 32 (30)0 (0)0 ( 0 ) 8 ( 2 ) 4 ( 2 ) 0 ( 0 ) 3 ( 5 ) 25 ( 2 8 )1 (2)1 (1)26 (32)0 (0)3 (0)0 (1) 1 (10)33 (25)16 (23)11 (44) 12 (10)32 (24) 0 (0)6 (3)2 (6)27 (67) 0 (0)65 (49) 1,2507 (3)0 (0)12 (6) 0 (2)0 (0)16 (12)4 (10)22 (68)2 (9)2 (6)68 (44)1 (2)37 Santa Vera Residential Development Traffic Study July 18, 2025 Page 9 Table 3 Existing Intersection Capacity Study Intersection Traffic Control Level of Service (Delay) AM Peak Hour PM Peak Hour Kerber Boulevard and Santa Vera Drive SSS A / B (11) A / B (12) Santa Vera Drive and West Site Access SSS A / B (10) A / A (9) Santa Vera Drive / Saratoga Circle and Saratoga Drive SSS A / B (10) A / B (10) Laredo Drive and Saratoga Drive SSS A / A (9) A / A (9) Laredo Drive and East Site Access (N) SSS A / A (9) A / A (9) Laredo Drive and Del Rio Drive / East Site Access (S) SSS A / B (11) A / B (10) SSS – Side-Street-Stop SITE PLAN CONSIDERATIONS A review of the proposed site plan does not indicate any major issues. However, the following items are offered for further consideration between the City and / or project team. • Locate signage and landscaping to avoid creating any sight distance issues. • Review truck maneuverability to limit potential internal circulation conflicts. • Install appropriate internal traffic controls (i.e., stop signs, etc.) per coordination with City staff. CONCLUSIONS Based on the findings of the study, the following conclusions are offered for consideration. 1) There are no existing intersection crash frequency or severity issues within the study area. 2) All study intersections and approaches operate at an acceptable LOS B or better during the typical weekday a.m. and p.m. peak hours. 3) The project is a 28-unit apartment / townhome residential development, which is immediately south of the existing 18-unit apartment complex. 4) Traffic forecasts were developed for year 2028 build conditions, which includes a one (1) percent annual background growth rate and trip generation from the proposed development; the proposed development is estimated to generate 32 a.m. peak hour (8 in / 24 out), 33 p.m. peak hour (21 in / 12 out), and 256 daily (128 in / 128 out) trips. 5) Results of the year 2028 build capacity analysis indicate that all study intersections and approaches are expected to continue to operate at an acceptable LOS B or better during the typical weekday a.m. and p.m. peak hours; no operational issues are expected because of the proposed development from an intersection capacity perspective. 6) No significant site plan related issues were identified, although the items noted above are offered for further consideration by the City and / or project team. 38 EM CS SARATOGA DRIVE LAREDO DRIVESANTA V E R A DRIVECHAIN LINK FENCE T T CABX CABX CABX HYDHYD N PROPOSED 12-UNIT BUILDING PROPOSED 16-UNIT BUILDING EXISTING BUILDING EXISTING GARAGES 3 2 '-8 " 60'-3" 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 22 3 4 4 S E TB A C K20'-0"SETBACK 20'-0" 1 BUILDING ENTRANCE 2 GARAGE ENTRANCE 3 DOG RUN 4 STORMWATER RETENTION SITE PLAN KEY kaas wilson architects Chanhassen Santa VeraSite Plan SD_100 07/10/2025 21036 1/64" = 1'-0"1 Site Plan 39 Level 1 100'-0" Level 2 110'-7 7/8" Truss Brg. 119'-9" 4.17.37.7 7.37.8 4.1 7.3 7.7 7.3 7.8 High Truss Brg. 130'-4 7/8" 7.67.3 7.7 7.37.7 Level 1 100'-0" Level 2 110'-7 7/8" Truss Brg. 119'-9" 7.6 26.1 7.3 7.7 6.17.6 7.3 7.76.1 7.6 High Truss Brg. 130'-4 7/8" 7.6 Level 1 100'-0" Level 2 110'-7 7/8" Truss Brg. 119'-9" 7.37.7 7.6 6.1 26.17.64.1 7.3 7.77.66.1 High Truss Brg. 130'-4 7/8" 7.3 7.6 7.3 Level 1 100'-0" Level 2 110'-7 7/8" Truss Brg. 119'-9" 7.6 4.1 7.3 7.7 7.3 7.37.7 7.3 7.87.8 4.1 High Truss Brg. 130'-4 7/8" 7.3 7.7 7.37.7 Level 1 to Mid-Point of Roof28'-9 1/2"EXTERIOR MATERIALS TAG KEY 5.1 ALUMINUM RAILINGS - COLOR: BLACK 4.1 CULTURED STONE - COLOR: TBD 5.3 METAL RAILING - COLOR: BLACK 6.1 CEDAR TIMBER - COLOR: STAINED 7.5 PVC SKIRTBOARD - COLOR: WHITE 7.1 LAP SIDING - COLOR: SW 7006 EXTRA WHITE 7.3 BOARD & BATTEN SIDING - SW 7006 EXTRA WHITE 7.4 TRIM - COLOR: SW 7006 EXTRA WHITE 7.6 ASPHALT SHINGLES - COLOR: CHARCOAL 26.1 EXTERIOR LIGHTING - COLOR: BLACK 8.1 VINYL WINDOW - COLOR: BLACK 7.7 DECORATIVE 12"x36" LOUVER - COLOR: BLACK 5.4 PREFINISHED ALUMINUM GUTTERS & DOWNSPOUTS - COLOR: WHITE kaas wilson architects Wildwood Chanhassen Santa Vera 12-Unit Building - Exteriors 3/16" = 1'-0"1 12-Unit Building (12A) - Front Elevation Copy 1 3/16" = 1'-0"2 12-Unit Building (12A) - Side Elevation 1 Copy 1 3/16" = 1'-0"3 12-Unit Building (12A) - Side Elevation 2 Copy 1 3/16" = 1'-0"4 12-Unit Building (12A) - Back Elevation Copy 1 40 413 ft² Unit B7-Garage 381 ft² Unit A1-Garage 318 ft² Unit B2-Garage 413 ft² Unit B7-Garage 381 ft² Unit A1-Garage 318 ft² Unit B2-Garage 413 ft² Unit B7-Garage 413 ft² Unit B7-Garage 381 ft² Unit A1-Garage 318 ft² Unit B2-Garage MECH797 ft² Unit A1 797 ft² Unit A1 797 ft² Unit A1 SD_321 4 SD_321 1 SD_321 2 SD_3213 797 ft² Unit A3 - Type A 699 ft² Unit A3 Type A-Garage 805 ft² Unit B7 1,221 ft² Unit B2 1,221 ft² Unit B2 1,221 ft² Unit B2 1,221 ft² Unit B2 SD_321 4 SD_321 1 SD_321 2 SD_3213 805 ft² Unit B7 805 ft² Unit B7 805 ft² Unit B7 Not Enclosed Unit B7 A SD_321 4 SD_321 1 SD_321 2 SD_3213 278 ft² Unit B7-Mezzanine 278 ft² Unit B7-Mezzanine 278 ft² Unit B7-Mezzanine 278 ft² Unit B7-Mezzanine kaas wilson architects Wildwood Chanhassen Santa Vera 12-Unit Building - Floor Plans 1/8" = 1'-0"1 Level 1 - 12-Unit Building 1/8" = 1'-0"2 Level 2 - 12-Unit Building Residential Unit Mix - 12-Unit Building Name Garage Stalls HUD Gross Square Footage HUD Net Rentable Square Footage Rooms Unit Type Main Floor Mezzanine Stairs Garage Area Total Unit Gross Total Gross Area Main Floor Net Stairs Net Mezzanine Net Garage Net Total Unit Net Total Net Area Bed Bath Level 1 Unit A1 1 797 ft² 0 ft² 0 ft² 381 ft² 1,178 ft² 1,178 ft² 740 ft² 0 ft² 0 ft² 339 ft² 1,079 ft² 1,079 ft² 1 1 Type B Unit A1 1 797 ft² 0 ft² 0 ft² 381 ft² 1,178 ft² 1,178 ft² 740 ft² 0 ft² 0 ft² 339 ft² 1,079 ft² 1,079 ft² 1 1 Type B Unit A1 1 797 ft² 0 ft² 0 ft² 381 ft² 1,178 ft² 1,178 ft² 740 ft² 0 ft² 0 ft² 339 ft² 1,079 ft² 1,079 ft² 1 1 Type B Unit A3 - Type A 2 797 ft² 0 ft² 0 ft² 491 ft² 1,288 ft² 1,288 ft² 675 ft² 0 ft² 0 ft² 454 ft² 1,129 ft² 1,129 ft² 1 1 Type A Level 2 Unit B2 1 1,221 ft² 0 ft² 92 ft² 318 ft² 1,631 ft² 1,631 ft² 1,153 ft² 68 ft² 0 ft² 289 ft² 1,510 ft² 1,510 ft² 2 2 - Unit B2 1 1,221 ft² 0 ft² 92 ft² 318 ft² 1,631 ft² 1,631 ft² 1,153 ft² 68 ft² 0 ft² 289 ft² 1,510 ft² 1,510 ft² 2 2 - Unit B2 0 1,221 ft² 0 ft² 92 ft² 318 ft² 1,631 ft² 1,631 ft² 1,153 ft² 68 ft² 0 ft² 289 ft² 1,510 ft² 1,510 ft² 2 2 - Unit B2 1 1,221 ft² 0 ft² 92 ft² 318 ft² 1,631 ft² 1,631 ft² 1,153 ft² 68 ft² 0 ft² 289 ft² 1,510 ft² 1,510 ft² 2 2 - Unit B7 1 805 ft² 278 ft² 96 ft² 413 ft² 1,592 ft² 1,592 ft² 758 ft² 76 ft² 235 ft² 368 ft² 1,437 ft² 1,437 ft² 2 2 - Unit B7 1 805 ft² 278 ft² 96 ft² 413 ft² 1,592 ft² 1,592 ft² 758 ft² 76 ft² 235 ft² 368 ft² 1,437 ft² 1,437 ft² 2 2 - Unit B7 1 805 ft² 278 ft² 96 ft² 413 ft² 1,592 ft² 1,592 ft² 758 ft² 76 ft² 235 ft² 368 ft² 1,437 ft² 1,437 ft² 2 2 - Unit B7 1 805 ft² 278 ft² 96 ft² 413 ft² 1,592 ft² 1,592 ft² 758 ft² 76 ft² 235 ft² 368 ft² 1,437 ft² 1,437 ft² 2 2 - Grand total 17,716 ft² 16,154 ft² 1/8" = 1'-0"3 Level 3 - 12-Unit Building 41 6 12-Unit Building - 3D Exteriors - 1 7 12-Unit Building - 3D Exteriors - 2 kaas wilson architects Wildwood Chanhassen Santa Vera 12-Unit Building - 3D Views 42 Level 1 100'-0" Level 2 110'-7 7/8" Truss Brg. 119'-9" 6.1 7.6 7.7 7.3 4.1 7.6 26.1 6.17.67.77.3 Level 1 100'-0" Level 2 110'-7 7/8" Truss Brg. 119'-9" 6.1 7.6 7.7 7.3 4.1 7.6 26.1 6.17.67.77.3 Level 1 100'-0" Level 2 110'-7 7/8" Truss Brg. 119'-9" 7.3 7.3 7.7 7.6 26.1 4.15.1 4.1 26.1 7.3 7.37.7 7.6 26.1 Level 1 to Mid-Point of Roof26'-0 9/16"Level 1 100'-0" Level 2 110'-7 7/8" Truss Brg. 119'-9" 7.6 7.3 7.3 7.7 7.67.3 7.37.74.17.6 26.14.1 4.1 7.3 7.2 4.1 7.3 7.2 4.1 4.1 kaas wilson architects Wildwood Chanhassen Santa Vera 16-Unit Building - Exteriors 3/16" = 1'-0"1 16-Unit Building- Side Elevation 2 3/16" = 1'-0"2 16-Unit Building - Side Elevation 1 3/16" = 1'-0"3 16-Unit Building - Front Elevation1 3/16" = 1'-0"4 16-Unit Building - Back Elevation1 43 SD_341 3 SD_341 4 SD_341 1 SD_3412 413 ft² Unit A2-Garage 381 ft² Unit A1-Garage 318 ft² Unit B2-Garage 318 ft² Unit B2-Garage 381 ft² Unit A1-Garage 413 ft² Unit C4-Garage 797 ft² Unit A1 797 ft² Unit A1 403 ft² Unit A4-Garage 355 ft² Unit A2-Garage 3 355 ft² Unit A2-Garage 3 855 ft² Unit A4 413 ft² Unit A2-Garage 381 ft² Unit A1-Garage 318 ft² Unit B2-Garage 318 ft² Unit B2-Garage 381 ft² Unit A1-Garage 413 ft² Unit C4-Garage 797 ft² Unit A1 403 ft² Unit A4-Garage 855 ft² Unit A4 797 ft² Unit A1 SD_341 3 SD_341 4 SD_341 1 SD_3412 1,221 ft² Unit B2 1,221 ft² Unit B2 1,660 ft² Unit C4 813 ft² Unit A2 813 ft² Unit A2 1,221 ft² Unit B2 1,221 ft² Unit B2 1,660 ft² Unit C4 813 ft² Unit A2 813 ft² Unit A2 kaas wilson architects Wildwood Chanhassen Santa Vera 16-Unit Building - Floor Plans 1/8" = 1'-0"1 Level 1 - 16-Unit Building 1/8" = 1'-0"2 Level 2 - 16-Unit Building Residential Unit Mix - 16-Unit Building Name Garage Stalls Count HUD Unit Gross Square Footage HUD Net Rentable Square Footage Rooms Unit TypeStairs Garage Area Total Unit Area Total Area Main Floor Stairs Garage Net Total Total Net Area Bed Bath Level 1 Unit A1 1 1 0 ft² 381 ft² 1,178 ft² 1,178 ft² 740 ft² 0 ft²339 ft² 1,079 ft² 1,079 ft² 1 1 Type B Unit A1 1 1 0 ft² 381 ft² 1,178 ft² 1,178 ft² 740 ft² 0 ft²339 ft² 1,079 ft² 1,079 ft² 1 1 Type B Unit A1 1 1 0 ft² 381 ft² 1,178 ft² 1,178 ft² 740 ft² 0 ft²339 ft² 1,079 ft² 1,079 ft² 1 1 Type B Unit A1 1 1 0 ft² 381 ft² 1,178 ft² 1,178 ft² 740 ft² 0 ft²339 ft² 1,079 ft² 1,079 ft² 1 1 Type B Unit A4 1 1 0 ft² 385 ft² 1,240 ft² 1,240 ft² 798 ft² 0 ft²346 ft² 1,144 ft² 1,144 ft² 1 1 Type B Unit A4 1 1 0 ft² 385 ft² 1,240 ft² 1,240 ft² 798 ft² 0 ft²346 ft² 1,144 ft² 1,144 ft² 1 1 Type B Level 2 Unit A2 1 1 96 ft² 412 ft² 1,321 ft² 1,321 ft² 753 ft² 83 ft² 337 ft² 1,173 ft² 1,173 ft² 1 1 - Unit A2 1 1 96 ft² 412 ft² 1,321 ft² 1,321 ft² 753 ft² 83 ft² 337 ft² 1,173 ft² 1,173 ft² 1 1 - Unit A2 1 1 96 ft² 373 ft² 1,282 ft² 1,282 ft² 753 ft² 83 ft² 352 ft² 1,188 ft² 1,188 ft² 1 1 - Unit A2 1 1 96 ft² 373 ft² 1,282 ft² 1,282 ft² 753 ft² 83 ft² 352 ft² 1,188 ft² 1,188 ft² 1 1 - Unit B2 1 1 92 ft² 318 ft² 1,631 ft² 1,631 ft² 1,148 ft² 86 ft² 287 ft² 1,521 ft² 1,521 ft² 2 2 - Unit B2 1 1 92 ft² 318 ft² 1,631 ft² 1,631 ft² 1,148 ft² 86 ft² 287 ft² 1,521 ft² 1,521 ft² 2 2 - Unit B2 1 1 92 ft² 318 ft² 1,631 ft² 1,631 ft² 1,148 ft² 86 ft² 287 ft² 1,521 ft² 1,521 ft² 2 2 - Unit B2 1 1 92 ft² 318 ft² 1,631 ft² 1,631 ft² 1,148 ft² 86 ft² 287 ft² 1,521 ft² 1,521 ft² 2 2 - Unit C4 1 1 96 ft² 412 ft² 2,168 ft² 2,168 ft² 1,502 ft² 76 ft² 337 ft² 1,915 ft² 1,915 ft² 3 2 - Unit C4 1 1 96 ft² 412 ft² 2,168 ft² 2,168 ft² 1,502 ft² 76 ft² 337 ft² 1,915 ft² 1,915 ft² 3 2 - Grand total 16 23,257 ft² 21,239 ft² 44 kaas wilson architects Wildwood Chanhassen Santa Vera 16-Unit Building - 3D Views 1 16-Unit Building - 3D Exteriors - 1 2 16-Unit Building - 3D Exteriors - 2 45 Application: Site Plan Review & PUD Ordinance Amendment (Planning Case #2025-07) Staff Report Date: August 6, 2025 Drafted By: Rachel Jeske, Planner Joe Seidl, Water Resources Engineer Mackenze Grunig, Project Engineer Planning Commission Review Date: August 12, 2025 City Council Review Date: August 25, 2025 SUMMARY OF REQUEST: The Applicant is requesting a site plan review and a planned unit development amendment to construct two apartment buildings consisting of 12-unit and 16- unit buildings, with modifications to the required architecture and parking setback. LOCATION: 621 Santa Vera Dr PID: 257620020 APPLICANT: Headwaters Development, LLC PROPERTY OWNER: Santa Vera Apartments, LLC PRESENT ZONING: PUDR – Saratoga 3rd Addition 2040 LAND USE PLAN: High Density Residential Public/Semi-Public SITE PLAN ACREAGE: 3.85 gross acres SITE PLAN DENSITY: 11.95 Units/Acre PROPOSED MOTION: “The Chanhassen Planning Commission recommends approval of the requested site plan and amendment to the Saratoga 3rd Addition Planned Unit Development Zoning Ordinance for the construction of two apartment buildings at 621 Santa Vera Drive, subject to the conditions of approval and adopts the attached Findings of Fact and Decision.” 46 Page 2 of 17 LEVEL OF CITY DISCRETION IN DECISION-MAKING: The city has a relatively high level of discretion in approving or denying PUD amendments because the city is acting in its legislative or policy-making capacity. A PUD amendment must be consistent with the city’s Comprehensive Plan. The city’s discretion in approving or denying a site plan is limited to whether or not the proposed project complies with zoning ordinance requirements. If it meets these standards, the city must then approve the site plan. This is a quasi-judicial decision. COMMUNITY ENGAGEMENT Notice of the public hearing at the Planning Commission is required to be mailed to all property owners within 500 feet. The city sent notices to those properties, as well as additional adjacent properties, and in total, 376 notices were mailed notifying nearby property owners of this proposed development. The mailing list used for the public hearing notice was also used to notify nearby residents of the neighborhood open house held by the applicant and a subsequent letter update sent by the applicant. The Applicant and property owner met with the City Council on February 10, May 5, and June 9 to review sketch plans of the proposed development. The Applicant and property owner held a neighborhood open house at the Chanhassen Recreation Center on April 9, 2025, and sent a neighborhood flyer with a project update the week of July 28. The city sent an email update to the “Proposed Developments” email subscription group regarding the project on July 24. APPLICABLE REGULATIONS Chapter 20, Article II, Division 6, Site Plan Review Chapter 20, Article VIII, Planned Unit Development Standards Chapter 20, Article XV, Division 1 “R-12” District Chapter 20, Article 20-XXIII, Division 20-XXIII-9 Design Standards for Multifamily Developments Saratoga 3rd Addition PUD Standards PROPOSAL/SUMMARY The Applicant is proposing the construction of two apartment buildings containing a total of 28 units. The request consists of a site plan approval with a planned unit development amendment to facilitate the construction of these buildings and associated site improvements. 47 Page 3 of 17 The existing Planned Unit Development (PUD) Ordinance allows for multi-family residential which are defined as multi-storied apartments or condominium units. The PUD Ordinance prohibits Townhouses, Detached Townhouses, and Detached Single-Family Homes. City Code includes the following definitions: “Dwelling, Multifamily” as a detached building containing three or more dwelling units. Apartment buildings, condominiums, manor homes, quad duplexes, and cooperatively owned buildings containing three or more dwelling units are multifamily dwellings. “Dwelling, Townhouse” means a single-family attached dwelling in a row of at least three such units in which each unit has its own front and rear access to the outside, no unit is located over another unit and each unit is separated from the adjoining unit by one or more common fire- resistant walls having no openings and extending from the basement to the roof. Based on the city’s definition for “Dwelling, Multifamily”, the proposed 16-unit and 12-unit buildings are considered a multifamily dwelling which is allowed by the existing PUD ordinance. The site is located north of Chanhassen Elementary School and northwest of City Center Park. The property has vehicular access to both Santa Vera Drive and Laredo Drive. The site is zoned PUDR, with the underlying zoning of the R-12 District. The request is for site plan approval to construct two additional apartment buildings, one 12- unit building and one 16-unit building, on a site with one existing apartment building, which consists of 18 units. The total permitted site coverage is 65%. The proposed development has a total hard coverage area of 50.4%. The applicant is also requesting an amendment to the Saratoga 3rd Addition Planned Unit Development Zoning Ordinance. The applicant has requested modifications to the exterior building material requirements and parking space setbacks. STAFF RECOMMENDATION Based upon the foregoing, staff is recommending approval of the requested site plan and PUD amendment with conditions as outlined in this staff report. SITE PLAN REVIEW This building must comply with the Design Standards in the Saratoga 3rd Addition PUD. The PUD requires that the development demonstrates a higher quality of architectural standards and site design, and use durable materials. Site coverage may not exceed 65%. The total hard surface coverage proposed on the site is 50.4%. The design of the building is attractive and is proposed to be constructed of high-quality materials. They include a mix of lap siding and board and batten siding for the main body of the building and cultured stone and cedar timber as 48 Page 4 of 17 accent materials. All elevations have received equal attention, and the building has a pitched roof. The added landscaping will buffer the proposed multi-family buildings from the surrounding elementary school and single-family neighborhoods. The applicant is requesting an amendment to the planned unit development pertaining to building materials. The existing PUD requires that the majority of all exterior surfaces shall be face brick, stucco with metal, wood, rock face block and stone accents. To maintain the intention of the PUD but to allow for more flexibility and timelessness to the required materials, staff recommends the following updated language within the PUD Ordinance: “Acceptable exterior materials shall be limited to vinyl lap siding, face brick, stucco, wood, rock face block, or stone. Buildings may have metal accents, but the metal accents may not exceed 15% of the building elevations.” The applicant is requesting an additional amendment to the planned unit development pertaining to parking setbacks. The PUD requires a 50-foot parking setback from lot lines with road frontage and all interior lot lines. The applicant requests to reduce the setback to 30 feet for lot lines with frontage and 20 feet for interior lot lines. The requested parking setback brings the existing surface parking lot into compliance and the site plan improvements will ensure that new parking is adequately screened from adjacent properties. COMPLIANCE TABLE Lot Ordinance Requirements Proposed Development Area 165,600 square feet 167,706 square feet Lot Coverage 65% 50.4% Building Height Ordinance Requirements Proposed Development Principal 35’ 35’ Building Setbacks Ordinance Requirements Proposed Development Laredo Drive 50’ 116.7’ Saratoga Drive 50’ 191’ Santa Vera Drive 50’ 50.7’ Interior Lot Lines 15’ 20’ Parking Setback Ordinance Requirements Proposed Development Laredo Drive 50’ 103’ Saratoga Drive 50’ 176’ Santa Vera Drive 50’ (20’ Min proposed) 32.9’ Interior Lot Lines 50’ (20’ Min proposed) 22’ 49 Page 5 of 17 Parking City Code Section 20-965 establishes the minimum number of parking spaces required to be provided for multi-family dwellings. For two-bedroom and larger units: two stalls shall be provided per unit, and one must be completely enclosed in a garage. Additionally, one visitor parking stall shall be provided for every four dwellings. # of Units # of spaces per unit # of Parking Stalls Required 16-Unit Apartment 1 Bedroom Units 10 1.25 (1 enclosed) 13 (10 of which enclosed) 2+ Bedroom Units 6 2 (1 enclosed) 12 (6 of which enclosed) 12-Unit Apartment 1 Bedroom Units 4 1.25 (1 enclosed) 5 (4 of which enclosed) 2+ Bedroom Units 8 2 (1 enclosed) 16 (8 of which enclosed) Total # of Units Guest Parking Requirement # of Guest Parking Required 28 1 space per 4 units 7 Based on the project as proposed, a minimum of 46 resident parking spaces are required, with at least 28 of the spaces being enclosed. The project as proposed provides for 28 enclosed parking spaces and an additional 28 surface parking spaces to meet the required 46 resident parking spaces. The project is also required to have at least 7 guest parking spaces. The project as proposed provides for 6 guest parking spaces. One additional guest parking space is required to be added to the site plan. Staff have identified space for an additional guest parking stall on the eastern edge of the currently shown 6 guest parking spaces. Site furnishing The property is proposed to contain communal resident amenities such as patio, a grill station, and a dog run. The project as proposed maintains the existing sidewalk connection along the length of Laredo Drive connecting to the trail on the north side of the Chanhassen Elementary property. A 36” chain link fence is proposed to run parallel to this sidewalk to deter access to the southern storm water pond. Neighborhood feedback during the open house included the desire to see a sidewalk added along the south sides of Santa Vera Drive and Saratoga Drive for the benefit of future residents as well as those who park along those roads in the summer and walk to the adjacent baseball 50 Page 6 of 17 fields. The addition of these sections of sidewalk would be at the expense of additional tree removal, some of which are ash trees, while others are identified as silver maples. Loading, mechanical, and refuse areas The PUD requires that all mechanical equipment shall be screened with material compatible to the building. Individual units are shown to have residential size air conditioning units. Condensing units are planned to be located on-grade, on the east and west sides of the 16-unit building and on the north and south sides of the 12-unit building. The landscaping plan shows a mixture of hydrangea, honeysuckle, hosta, and sedum plantings as screening for the proposed air conditioning units. The proposed sceening appears reasonable; however, does require an amendment to the existing PUD Ordinance as the ordinance indicates building materials to be used as screening rather than landscaping. No central garbage and recycling services are proposed. Instead, each tenant will keep their own garbage and recycling bins internal to their units and will, therefore, not require any additional screening. The existing Santa Vera apartments have a garbage shed that has two dumpsters: one each for recycling and garbage, with garbage pickup occurring twice a week and recycling pickup once a week. Lighting The Saratoga 3rd Addition PUD requires that all light fixtures shall be shielded, light fixtures shall not exceed 20 feet in height, and light levels shall be no more than ½ candle at the property line. City Code requires that lighting on the building faces shall also be restricted to having a total cutoff angle equal to or less than 90 degrees. The architectural building elevations show ornamental lighting over all apartment entrances as well as some garage entrances and windows. Each of the fixtures is below 20 feet and has a cutoff angle equal to or less than 90 degrees. The site plan proposes five drive aisle street light poles with foundations. Heights must be provided for these lights and must adhere to the 20- foot maximum height requirement per the existing PUD ordinance. Signage Plans provided do not depict a final signage plan for the site. Signage for the property shall comply with City Code Section 20-1301 and all other applicable regulations to the site. Sign permits will be required to be applied for and reviewed at the time of building permit. LANDSCAPING AND TREE PRESERVATION The applicant for the Santa Vera Apartments submitted tree canopy coverage and preservation calculations. The submitted plans show that tree canopy to remain will not meet canopy coverage requirements. As a result, plans must include a reforestation plan to bring the total canopy coverage back to the minimum requirement. 51 Page 7 of 17 Total upland area (excl wetlands, bluff) 3.85 acres Baseline canopy coverage 1.22 acres Minimum canopy coverage required 0.77 acres or 20% Proposed tree preservation 0.44 acres or 11% The applicant must bring the canopy coverage on site up to the 0.77 acres which equates to the 20% minimum. The difference between the required coverage and the remaining coverage is multiplied by 1.2 for total area to be replaced. One tree is valued at 1,089 SF. Minimum required 0.77 Less canopy preserved 0.44 Minimum canopy coverage to be replaced- 0.33 Multiplied by 1.2 0.39 acres or 17,249.8 sf Divided by 1089 sf = Total number of trees to be planted: 16 The applicant has submitted a landscape plan showing a total of 47 trees to be planted in the site plan which exceeds canopy coverage requirements. The applicant shall adjust quantities to meet diversity requirements. No more than 30% of the trees can be from one family, no more than 20% from the same genus and no more than 10% of the same species. Vehicular Use Area Requirements Staff have analyzed the site plan and found that additional screening on the site has satisfied the requirements in Sec 20-1181. In addition, the applicant is providing the required landscaping within the vehicular use areas. Buffer yard requirements The PUD Ordinance establishes that landscaping along streets shall comply with buffer yard standard B and interior lot lines shall comply with buffer yard A. Buffer yard A shall be 10 feet in width. A landscape plan must be approved as part of the site plan review process. Required plantings/landscape area Buffer yard B – East Prop. Line - 509’ 10 Overstory trees 20 Understory trees 30 Shrubs Buffer yard B – North Prop. Line - 209’ 4 Overstory Trees 8 Understory trees 12 Shrubs Buffer yard B – NE Prop line - 228’ 4 Overstory Trees 8 Understory trees 12 Shrubs Buffer yard A – West Prop. Line - 509’ 5 Overstory trees 10 Understory trees 15 Shrubs 52 Page 8 of 17 Buffer yard A – South Prop. Line - 164’ 2 Overstory tree 3 Understory tree 5 Shrubs The buffer yard requirements total to a combination of 74 overstory and understory trees as well as a total of 74 shrubs. The landscaping plan includes 47 trees, 179 shrubs, and 227 perennials. This is in addition to the 35 trees identified to be saved on site, bringing the total number of trees proposed to 82. Based on the trees to be preserved and the new plantings, the buffer yard requirements appear to be met. The Applicant shall provide a breakdown of how existing and proposed plantings satisfy the buffer yard requirements. BUILDING ARCHITECTURAL REVIEW Required architectural standards Based on the proposed development site being zoned as a residential planned unit development, the building must meet the design standards established by the Saratoga 3rd Addition PUD. Massing and Placement The architectural style is known as a “flat” because each unit has a private entrance and no shared interior space. The building rhythm provides proper visual articulation and harmony with the surrounding area. The buildings have pitched roofs, as required by the PUD. The buildings are located on the property's south and west sides, offsetting them from adjacent roadways and provides a buffer from the surrounding single-family development. Building Height The architectural elevations, as provided, propose a building height of 30.4 feet for the 12-unit building and 26.05 feet for the 16-unit building. City Code establishes that building height shall be measured the vertical distance between the highest adjoining ground level at the building and the average height of the highest gable of a pitched roof. The proposed buildings adhere to the PUD ordinance restriction of 35 feet. 53 Page 9 of 17 Elevations 54 Page 10 of 17 Renderings 55 Page 11 of 17 Materials and Color The proposed building contains four main materials: board & batten, lap siding, cultured stone, and cedar timber. The design pulls from the architecture of the existing building on the site, while providing a more modern feel and style. While these materials do not comply with those listed in the existing PUD, staff recommend the approval of the revised PUD language, which provides increased flexibility in materials. The applicant is providing a variety of both high-quality and durable materials. PROJECT OVERVIEW – ENGINEERING AND WATER RESOURCES The Applicant is requesting a site plan review of a 28-unit multi-family apartment project located just north of downtown Chanhassen. Construction plans and Stormwater Reports developed by Measure Group dated July 21, 2025, were reviewed by staff. The proposed design would create 1.11 acres of new impervious area in the form of an apartment building, parking lots, sidewalks, and streets. Stormwater is proposed to be managed by two storm water ponds along Laredo Dr. TRAFFIC A traffic study for the proposed Santa Vera Apartments was completed by TC2 on July 18, 2025, by Matt Pacyna. The project proposes to continue using the three existing access points: two on Laredo Drive and one on Santa Vera Drive. The adjacent street network—Laredo Drive (1,300 ADT), Santa Vera Drive (700 ADT), and Kerber Boulevard (4,000 ADT)—remains within the capacity thresholds for their respective classifications. City staff has reviewed the study and found the estimated trip generation to be relatively low. During peak hours, 24 vehicles are expected to exit and 21 to enter the site. The development is projected to add approximately 256 daily trips, with most of the additional traffic distributed 75/25 between Laredo Drive and Santa Vera Drive. Even with this increase, the affected streets are projected to remain within their functional classification capacities. An addition to the traffic study shall be made to incorporate a traffic sight line review at the access to Santa Vera Dr. and both access points on Laredo Dr. The applicant shall update the construction plans with any additional information following this addition. SANITARY SEWER & WATER MAIN The applicant is proposing construction of 4” PVC for the sanitary sewer and 6” for the watermain. Service connections are proposed to be separate 4” fire & 2” domestic for water and 4” for sanitary sewer. Plans that illustrate the profile of the utilities along with their size and material are required for review and approval prior to final plan approval. The proposed sanitary sewer and watermain are undersized for the city to own and maintain them. The 56 Page 12 of 17 applicant is expected to complete the revisions and coordinate additional reviews to identify if any of the proposed utilities are private or publicly owned. GRADING & DRAINAGE In the existing condition stormwater on the site generally flows from west to east. City Center Park, which borders the property to the west, is located at a high point, with runoff leaving the park in all directions, including runoff that flows through the Santa Vera site. On the project site, stormwater primarily flows overland through a conveyance depression that directs most of the site’s runoff to three catch basins located at a low point along Laredo Drive. Currently, stormwater from the site is collected and conveyed by public infrastructure, including storm sewers and wet ponds, before ultimately discharging into Lotus Lake. There are no public or private stormwater Best Management Practices (BMPs) located on the property. As a result, pollutants generated on-site are carried downstream and treated solely by the city’s infrastructure. The project site lies in an older area of Chanhassen that was developed in the 1960s and 1970s, before current stormwater management standards were adopted. As a result, the area lacks sufficient BMPs, contributing to higher pollutant loads reaching Lotus Lake. The redevelopment of the Santa Vera property presents an opportunity to address these deficiencies by incorporating stormwater treatment measures that go beyond current regulatory requirements. PROPOSED CONDITIONS Under the proposed development plan, the site will be mass graded to accommodate new apartment buildings, a parking lot, driveways, and stormwater reuse basins. Drainage patterns will remain generally consistent with existing conditions. The northern portion of the site will remain unchanged and continue draining toward the storm sewer on Saratoga Drive. Runoff from the proposed buildings, parking lot, driveway, and part of the existing apartment building will be collected via storm sewer and directed to the stormwater reuse basins located on the east portion of the site adjacent to Laredo Drive. These reuse basins will be connected by storm sewer and discharge to the existing storm sewer system on Laredo Drive through a single outlet. Stormwater treatment for the proposed impervious surfaces will be provided through a combination of stormwater basins and a reuse system designed for irrigation. The site is currently zoned as Planned Unit Development (PUD). However, preliminary development plans propose changes in the previously approved PUD and relief from sections of City Code to facilitate the proposed plan. In return, it is recommended that the applicant provide enhanced water quality treatment to reduce the burden on downstream stormwater infrastructure. The stormwater basins along Laredo Drive appear to be too high in elevation to direct and treat stormwater from the adjacent area, however, there appears to be an opportunity to route stormwater from Saratoga Drive into the proposed stormwater basins. 57 Page 13 of 17 Additional engineering calculations are needed to understand if this is a viable option. As such it is recommended that the applicant work with staff to optimize the stormwater design and assess opportunities to provide stormwater treatment in excess to the requirements. If the design was reconfigured to treat stormwater by the public ROW, the city may provide relief to the project by reducing stormwater development fees and/or taking on the ownership and maintenance of the stormwater treatment system depending on the amount of excess stormwater treatment provided. EROSION CONTROL The proposed development will create greater than one (1) acre of land disturbance and therefore will be subject to the General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit). A Surface Water Pollution Prevention Plan (SWPPP) was included in the preliminary site plan submittal. The SWPPP is a required submittal element for final site plan review along with the Erosion and Sediment Control Plan (ESCP) in accordance with Section 19-145 of City Code. No earth disturbing activities may occur until the SWPPP is formally approved. This SWPPP shall be a standalone document consistent with the NPDES Construction Permit and shall contain all required elements of the permit. The SWPPP will need to be updated as the plans are finalized, when the contractor and their sub- contractors are identified, and as other conditions change. An updated SWPPP shall be submitted and approved prior to recording the final site plan agreement. All erosion and sediment control BMPs shall be installed and inspected prior to initiation of site grading activities. STORM WATER MANAGEMENT Article VII, Chapter 19 of City Code describes the required storm water management development standards. Section 19-141 states that “these development standards shall be reflected in plans prepared by developers and/or project proposers in the design and layout of site plans, subdivisions and water management features.” These standards include abstraction of runoff and water quality treatment resulting in the removal of 90% total suspended solids (TSS) and 60% total phosphorous (TP). The proposed project is located within the Riley Purgatory Bluff Creek Watershed District (RPBCWD) and is therefore subject to the watershed’s rules and regulations. A RPBCWD permit will be required for final site plan approval. A Stormwater Management Report is required to be submitted for review to confirm all applicable stormwater management requirements are being met. This includes rate control, volume abstraction and water quality requirements among others. The site proposes to meet stormwater management requirements through the use of stormwater basins and reuse system. The applicant shall confirm that the reuse system will provide enough water for the proposed irrigation system based on the drainage area and the storage in the tank. A backup potable connection may be needed. Currently the TSS removal requirements and TP removal requirements are being met on site. The applicant shall provide final versions of all 58 Page 14 of 17 modeling (Hydro CAD and MIDS) and Stormwater Management Report to address remaining comments and confirm rate, volume and water quality requirements are met as part of the final site plan approval. The stormwater basins do not appear to meet the 3-foot freeboard requirements to the existing and proposed buildings onsite. As such the applicant shall revise the design to meet the stormwater design requirements outlined in City Code. The proposed stormwater management systems shown in the preliminary site plan are to be privately owned and maintained. An operations and maintenance plan is required to ensure that the private stormwater infrastructure is maintained in good working order. The maintenance plan includes descriptions of maintaining the BMPs, maintenance schedule, responsible party, and information on how the system will be cleaned out. The applicant shall submit an updated stormwater operations and maintenance including all required exhibits plan as part of the final plan submittal. SITE PLAN FINDINGS In evaluating a site plan and building plan, the city shall consider the development's compliance with the following: 1. Consistency with the elements and objectives of the city's development guides, including the Comprehensive Plan, official road mapping, and other plans that may be adopted; 2. Consistency with this division; 3. Preservation of the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing areas; 4. Creation of a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; 5. Creation of functional and harmonious design for structures and site features, with special attention to the following: a. An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; b. The amount and location of open space and landscaping; c. Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and 59 Page 15 of 17 d. Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. 6. Protection of adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. Finding: The proposed development is consistent with the city's design requirements, the Comprehensive Plan, the zoning ordinance if the planned unit development amendments are approved, the design standards, and the site plan review requirements. Staff is recommending approval of the request with conditions. The site design is compatible with the surrounding developments. It is functional and harmonious with the area. Staff regards the project as a reasonable use of the land. Based upon the foregoing, staff is recommending approval of the site plan and planned unit development ordinance amendments with conditions outlined in the staff report. RECOMMENDATION Staff recommend approval of the requested site plan and planned unit development amendments as proposed subject to updating of plans based on staff review comments. APPLICATION REVIEW COMMENTS PLANNING: 1. A photometric plan must be submitted and comply with the lighting requirements of the Saratoga 3rd addition PUD ordinance. 2. Applicant shall enter into a Site Plan Agreement with the City of Chanhassen. 3. Applicant shall update the site plan so that a total of at least seven (7) guest parking spaces are provided. 4. A sidewalk along the south sides of Santa Vera Drive and Saratoga Drive adjacent to the proposed project may be required at the discretion of the City Council. FORESTRY: 1. Applicant must include the condition of all trees over ten inches in diameter as part of the tree survey. Condition shall indicate one of “Poor, Fair, or Good” as the forestry standard. 2. Applicant must update the quantities in the landscape plan to meet the diversity requirements- no more than 30% of trees can be from one family, no more than 20% of the trees from the same genus and no more than 10% of the same species. 3. Applicant shall provide a breakdown of how existing and proposed plantings are planned to satisfy the buffer yard requirements. 60 Page 16 of 17 4. Applicant must include location of the tree preservation fencing on the plan set. Tree preservation fencing shall be installed around existing trees to be saved prior to any construction activities and remain installed until completion. 5. All trees must be planted on private property outside of the city’s right-of-way. ENGINEERING: 1. The developer shall enter into Encroachment Agreements for private improvements (e.g., retaining walls and monument signage) located within the 10-foot-wide public drainage and utility corridor abutting the right-of-way prior to issuance of building permits. 2. The applicant and their Engineer shall work with city staff in amending the construction plans. Final construction plans will be subject to review and approval by staff prior to start of construction. 3. Retaining walls shall be privately owned and maintained. All walls four feet and greater in height shall be engineered. 4. All sanitary sewer mains and watermains will be publicly owned and maintained after acceptance of the public improvements by the City Council. These utilities shall be covered by a Drainage and Utility Easement which shall be large enough for the owner to own and maintain. Applicant shall loop the watermain through the site from Santa Vera Dr to Laredo Dr, and this watermain shall be publicly owned and maintained. 5. The applicant will be required to enter into a Site Plan Agreement with the city and all applicable securities and fees provided prior to recording of the final plans. 6. Applicant shall provide a color-coded map identifying what improvements are public and what are private with final plans. 7. Chanhassen engineering standards require 6” minimum for sanitary sewer service pipe. 8. It is the applicant’s responsibility to ensure that permits are received from all other agencies with jurisdiction over the project (i.e. Army Corps of Engineers, DNR, MnDOT, Carver County, RPBC Watershed District, Board of Water and Soil Resources, PCA, MDH, MPCA, etc.). Applicant shall provide a copy of all permits prior to starting construction. 9. The construction plans show connecting into an existing sanitary sewer main. That main shall be cleaned and televised prior to connection and the video provided to the project engineer for review. 10. City Standard Detail Plates shall be included in the construction plan set and displayed in a layout format of 2 rows by 4 columns for consistency with city expectations. WATER RESOURCES: 1. The developer shall enter into a site plan agreement with the city and provide necessary financial security to guarantee compliance with the terms of site plan approval and construction of infrastructure onsite. 2. It is the developer’s responsibility to ensure that permits are received from all other agencies with jurisdiction over the project (i.e. Carver County, RPBCWD, Board of Water and Soil Resources, MnDOT, etc.) prior to the commencement of construction activities. 3. The developer and their Engineer shall work with city staff in amending the construction plans, dated July 21, 2025, developed by Measure Group to fully satisfy construction 61 Page 17 of 17 plan comments and concerns. Final construction plans will be subject to review and approval by staff prior to recording the site plan agreement. 4. An Operations and Maintenance plan for all proposed private stormwater management systems including the inspection frequency, maintenance schedule, and responsible party shall be submitted with the final plans. 5. The applicant shall provide updated H&H and water quality modelling with the final plan submittal. 6. The design shall be updated to meet the city’s freeboard requirement. BUILDING: 7. A building permit must be obtained before beginning any construction. 8. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 9. Building plans must provide sufficient information to verify that proposed building meets all requirements of the Minnesota State Building Code, additional comments or requirements may be required after plan review 10. The building is required to have automatic fire extinguishing systems. 11. Structure proximity to property lines (and other buildings) will have an impact on the code requirements for the proposed buildings, including but not limited to; allowable size, protected openings and fire-resistive construction. These requirements will be addressed when complete building and site plans are submitted. 12. Building plans must include a code analysis that contains the following information: Key Plan, Occupancy group, Type of construction, Allowable height and area, Fire sprinklers, Separated or non-separated, Fire resistive elements (Ext walls, Bearing walls - exterior or interior, Shaft, Incidental use), Occupant load, Exits required (Common path, Travel distance), Minimum plumbing fixture count 13. Retaining walls (if present) more than four feet high, measured from the bottom of the footing to the top of the wall, must be designed by a professional engineer and a building permit must be obtained prior to construction. Retaining walls (if present) under four feet in height require a zoning permit. 14. A final grading plan and soils report must be submitted to the Inspections Division before building permits will be issued. 15. Accessibility will have to be provided to all portions of the development, and a percentage of the units may also be required to be accessible or adaptable in FIRE: 1. Must add a hydrant on the north side of the property as there is nothing accessible from Santa Vera. 2. Balconies shall be sprinkled due to lack of adequate fire access on the west and south property lines. 62 1 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA ORDINANCE NO. ____ AN ORDINANCE AMENDING CHAPTER 20 OF THE CHANHASSEN CITY CODE, THE CITY’S ZONING ORDINANCE, BY AMENDING THE SARATOGA 3RD ADDITION PLANNED UNIT DEVELOPMENT ZONING THE CITY COUNCIL OF THE CITY OF CHANHASSEN ORDAINS: Section 1. Chapter 20 of the Chanhassen City Code, the City's zoning ordinance, is hereby amended by amending the Saratoga 3rd Addition Planned Unit Development zoning to provide as follows: Saratoga 3rd Addition Zoning Standards a. Intent The purpose of this zone is to create a PUD high density residential development. The use of the PUD zone is to allow for more flexible design standards while creating a higher quality and more sensitive proposal. All utilities are required to be underground. The development shall proceed through the site plan review based on the development standards outlined below. The PUD requires that the development demonstrate a higher quality of architectural standards and site design. Except as modified by the standards below, the development shall comply with the requirements of the R-12, High Density Residential District. b. Permitted Uses The permitted uses in this zone shall be limited to multi-family residential uses. A total of 46 units are permitted on the site. (There are eight existing units.) Multi-family Residential – This shall be defined as multi-storied apartments or condominium units. c. Prohibited uses • Townhouses • Detached Townhouses • Detached Single-Family Homes d. Setbacks Street Frontage Minimum Setback Building/Parking (feet) Laredo Drive 50/50 30 Saratoga Drive 50/50 30 63 2 Santa Vera Drive 50/50 20 Interior Lot Line 15/50 20 The PUD standard for hard surface coverage is 65% e. Building Materials and Design 1. The PUD requires that the development demonstrate a higher quality of architectural standards and site design. All mechanical equipment shall be screened with material compatible to the building or through landscaping. 2. All material shall be of high quality and durable. Major exterior surfaces of all walls shall be face brick, stucco with metal, wood, rock face block and stone accents. The structure shall have a pitched roof. Acceptable exterior materials shall be limited to vinyl lap siding, face brick, stucco, wood, rock face block, or stone. Buildings may have metal accents, but the metal accents may not exceed 15% of the building elevations. Structures shall have a pitched roof. 3. Block shall have a weathered face or be polished, fluted or broken face. 4. All accessory structures shall be designed to be compatible with the primary structure. 5. All roof mounted equipment shall be screened by walls of compatible appearing material or camouflaged to blend into the building or background. Wood screen fences are prohibited. All exterior process machinery, tanks, etc., are to be fully screened by compatible materials. 6. Acceptable materials will incorporate textured surfaces, exposed aggregate and/or other patterning. All walls shall be given added architectural interest through building design or appropriate landscaping. The building(s) shall have varied and interesting detailing. The use of a solid wall unrelieved by architectural detailing, such as change in material, change in color, fenestrations, or other significant visual relief provided in a manner or at intervals in keeping with the size, mass and scale of the wall and its views from the public ways shall be prohibited. 7. Space for recycling shall be provided. 8. There shall be no underdeveloped sides of building. All elevations visible from the street shall receive nearly equal treatment and visual qualities. f. Site Landscaping and Screening 1. Landscaping along streets shall comply with buffer yard standard B. Interior lot lines shall comply with buffer yard A, 10 feet in width. A landscape plan must be presented for approval with the site plan review process. 2. Storage of materials outdoors is prohibited unless it has been approved under site plan review. g. Signage 1. Signage shall comply with the sign ordinance for residential districts. 2. All signs shall require a sign permit. 64 3 h. Lighting 1. All light fixtures shall be shielded. Light levels shall be no more than ½ candle at the property line. Light fixtures shall not be more than 20 feet in height. This does not apply to street lights. i. Alternative Access 1. Separate pedestrian access shall be provided from the site to the public sidewalk and trail system. Section 2. This ordinance shall be effective immediately upon its passage and publication. PASSED AND ADOPTED this day of August, 2025, by the City Council of the City of Chanhassen, Minnesota Jenny Potter, City Clerk Elise Ryan, Mayor (Published in the Sun Sailor on ) 65 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION IN RE: Application of Headwaters Development LLC, for a site plan review and a planned unit development ordinance amendment. On August 12, 2025, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application for site plan review and a planned unit development ordinance amendment for the construction of two multi-family apartment buildings, totaling 46 units. The Planning Commission conducted a public hearing on the proposed development which was preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and made the following Findings of Fact on the remaining application. FINDINGS OF FACT 1. On July 11, 2025 the City received a land use application for the property legally described in attachment Exhibit A for the following: A. A site plan review for the construction of two apartment buildings, totaling 46 units. B. A planned unit development ordinance amendment which modifies exterior building material requirements as well as the setbacks required for parking spaces 2. The property is currently zoned PUDR – Saratoga 3rd Addition. 3. The property is guided by the Land Use Plan for High Density Residential and Public/Semi- Public. SITE PLAN REVIEW FINDINGS 4. The Applicant has requested approval of the site plan dated 07.30.2025 prepared by Measure Group. 5. The zoning ordinance directs the City to consider nine possible adverse effects of the proposed site plan. The nine (9) effects and our findings regarding them are: a) Is consistent with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted. Finding: The site plan is consistent with the elements and objectives of the city's development guides, comprehensive plan, and official road mapping. b) Is consistent with the site plan review requirements. Finding: The site plan is consistent with the site plan review requirements. 66 c) Preserves the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing or developing areas. Finding: The layout of the proposed structure minimizes affects to the natural resources and the grade is designed to keep with the appearance of surrounding single-family and park areas. d) Creation of a harmonious relationship of buildings and open spaces with natural site features and with existing and future buildings having a visual relationship to the development. Finding: The proposed design creates a harmonious relationship between the building and its natural features through strategic placement. e) Creates a functional and harmonious design for structures and site features, with special attention to the following: i. An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; ii. The amount and location of open space and landscaping; iii. Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and iv. Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. Finding: The proposed site plan does create an internal sense of order for the buildings and uses on the site through the balance of landscaping, material applications, and circulation for pedestrians and vehicles. f) Protects adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. Finding: The site plan as proposed does protect adjacent and neighboring properties for surface water drainage, sound and sight buffers, preservation of views, light and air that could have substantial effects on neighboring land uses. g) Within the Highway Corridor (HC) districts, consistency with the purpose, intent and standards of the HC districts. 67 Finding: The proposed site plan is not within the Highway Corridor District. h) Within the Bluff Creek Overlay (BCO) district, consistency with the purpose, intent and standards of the BCO district. Finding: The proposed site plan is not within the Bluff Creek Overlay District. i) Maintain an acceptable road system level of service. Finding: The proposed plan does not affect the road system level of service and internally in the site improves upon items that could affect the road system, such as connection, parking, and pedestrian circulation. 7. The planning report Planning Case 2025-07, dated August 6, 2025, prepared by Rachel Jeske, et al, is incorporated herein. RECOMMENDATION The Planning Commission recommends approval of the requested Site Plan Review and Planned Unit Development Ordinance Amendment to the City Council. ADOPTED by the Chanhassen Planning Commission this 12th day of August 2025. CHANHASSEN PLANNING COMMISSION BY:_______________________________ Eric Noyes, Chair 68 EXHIBIT A Lot 2, Block 1, Saratoga 3rd Addition. 69 70 71 wetland concerns. The city should be sure these are addressed to ensure proper drainage from adjacent properties. This concern has been raised during recent road updates along nearby roads. Thank you. Sincerely, Dave and Barb Howe 400 Santa Fe Trail Chanhassen 72 CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE I, Jenny Potter, being first duly swom, on oath deposes that she is and was on July 30,2025, the duly qualified and acting City Clerk ofthe City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy ofthe attached notice Consider a request for a variance for a site plan review and to amend the planned unit development, to construct two new apartment buildings (16- and l2-unit), in addition to renovating the existing l8- unit apartment building, for a total of 46-units total. Owner: Santa Vera Apartments' LLC; Appticant: Headwaters Development, LLC to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner. and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses ofsuch owners were those appearing as such by lhe records ofthe County Treasurer, Carver County. Minnesota, and by other appropriate records. .lenny ttcr. City Clcrk Subscribed and swom to before me this Ll day of ttv r^ v \)J,e//4 4//arlnr*-- .2025. AMY K. WEIDM AN Notary Public-Minnesota Notary Public Erplro6 Jln 31 , 2027 STATE OF MINNESOTA) ) ss. COLTNTY OF CARVER ) 0, 73 NOTICE OF PUBLIC HEARING CHANHASSEN PLANNING COMMISSION MEETING NOTICE OF PUBLIC HEARING CHANHASSEN PLANNING COMMISSION MEETING Date & Time: Tuesday, August 12, 2025 at 6:00 p.m. This hearing may not start until later in the evening, depending on the order of the agenda. Location: City Hall Council Chambers, 7700 Market Blvd. Proposal: Consider a request for a site plan review and to amend the planned unit development, to construct two new apartment buildings (16- and 12-unit), in addition to renovating the existing 18-unit apartment building, for a total of 46-units total. Applicant: Headwaters Development, LLC Property Location: 621 Santa Vera Drive A location map is on the reverse side of this notice. What Happens at the Meeting: The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the public hearing through the following steps: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans for the project. 3. Planning Commission discusses the proposal. 4. Public hearing is opened taking comments from the public, up to 5 minutes per person. 5. Public hearing is closed and the Planning Commission continues discussion on the project prior to voting on the project. Questions & Comments: To view project information before the meeting, please visit the city’s proposed development webpage: www.chanhassenmn.gov/proposeddevelopments Date & Time: Tuesday, August 12, 2025 at 6:00 p.m. This hearing may not start until later in the evening, depending on the order of the agenda. Location: City Hall Council Chambers, 7700 Market Blvd. Proposal: Consider a request for a site plan review and to amend the planned unit development, to construct two new apartment buildings (16- and 12-unit), in addition to renovating the existing 18-unit apartment building, for a total of 46-units total. Applicant: Headwaters Development, LLC Property Location: 621 Santa Vera Drive A location map is on the reverse side of this notice. What Happens at the Meeting: The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the public hearing through the following steps: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans for the project. 3. Planning Commission discusses the proposal. 4. Public hearing is opened taking comments from the public, up to 5 minutes per person. 5. Public hearing is closed and the Planning Commission continues discussion on the project prior to voting on the project. Questions & Comments: To view project information before the meeting, please visit the city’s proposed development webpage: www.chanhassenmn.gov/proposeddevelopments Sign up to receive email updates about this or other projects. Go to https://www.chanhassenmn.gov/i-want-to/subscribe Sign up to receive email updates about this or other projects. Go to https://www.chanhassenmn.gov/i-want-to/subscribe 74 Disclaimer This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The preceding disclaimer is provided pursuant to Minnesota Statutes §466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties which arise out of the user's access or use of data provided. «Tax_name» «Tax_add_l1» «Tax_add_l2» Disclaimer This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The preceding disclaimer is provided pursuant to Minnesota Statutes §466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties which arise out of the user's access or use of data provided. «Next Record»«Tax_name» «Tax_add_l1» «Tax_add_l2» Subject Area Subject Area 75 Tax name Tax add l1 Tax add l2 AARON KUBAL 700 WEST VILLAGE RD 108 CHANHASSEN, MN 55317- ABUL MONSUR 750 WEST VILLAGE RD # 106 CHANHASSEN, MN 55317- ADAM CHINNOCK 7522 FRONTIER TRL CHANHASSEN, MN 55317- AGG PROPERTIES LLC 6400 CHATHAM WAY EDEN PRAIRIE, MN 55346- AKINS CHANVIEW LLC 5416 W 70TH ST #8 EDINA, MN 55439- ALEX TSEGAI 740 WEST VILLAGE RD #101 CHANHASSEN, MN 55317-7533 ALFRED A ALEJO 7465 CHIPPEWA TRL CHANHASSEN, MN 55317- ALLEN J KREEMER 7615 KIOWA AVE CHANHASSEN, MN 55317- ANDREW C HAASE 7602 GREAT PLAINS BLVD CHANHASSEN, MN 55317-7914 ANDREW KLINKNER 7606 KIOWA AVE CHANHASSEN, MN 55317- ANNE T JESKE PO BOX 1041 CHANHASSEN, MN 55317-1041 ANTHONY M & PATRICIA PIERI PO BOX 662 CHANHASSEN, MN 55317-0662 ARLIS A BOVY 7339 FRONTIER TRL CHANHASSEN, MN 55317-9796 BARBARA A EDESKUTY 406 CIMARRON CIR CHANHASSEN, MN 55317-9776 BENJAMIN GROFF 311 W 77TH ST CHANHASSEN, MN 55317- BERNARD A & COLEEN M POIRIER 304 77TH ST W CHANHASSEN, MN 55317-9798 BLAKE EREN TANBERK 505 DEL RIO DR CHANHASSEN, MN 55317- BODKIN PROPERTIES LLC 6357 CLIFFWOOD CIR EXCELSIOR, MN 55331- BONN H & VERNELLE E CLAYTON 422 SANTA FE CIR CHANHASSEN, MN 55317-9792 BRADLEY BLADINE 6791 BRIARWOOD CT CHANHASSEN, MN 55317- BRANDON KARL WILLIAMS 7611 LAREDO DR CHANHASSEN, MN 55317-9611 BRIAN D RAMSAY 7555 GREAT PLAINS BLVD CHANHASSEN, MN 55317-9681 BRIAN J & JULIE A TEIGLAND REV TRUST 407 HIGHLAND DR CHANHASSEN, MN 55317-9790 BRIAN P & JACQUELINE MCCARTHY 513 DEL RIO DR CHANHASSEN, MN 55317-9770 BRIAN ROGER CARLSON 515 LAREDO LN CHANHASSEN, MN 55317- BRUCE C PHILBRICK 620 SANTA VERA DR CHANHASSEN, MN 55317-9773 BRUCE L & REBECCA GRANOWSKI 504 DEL RIO DR CHANHASSEN, MN 55317-9785 BRYCE MUIR 7606 GREAT PLAINS BLVD CHANHASSEN, MN 55317-7914 CAITLIN MORRIS 7603 HURON AVE CHANHASSEN, MN 55317- CAL SHELANGOSKI 7516 FRONTIER TRL CHANHASSEN, MN 55317- CARVER COUNTY CDA 705 WALNUT ST N CHASKA, MN 55318- CHANHASSEN CITY PO BOX 147 CHANHASSEN, MN 55317- 76 CHARLES F LITTFIN 7609 LAREDO DR CHANHASSEN, MN 55317-9611 CHERYL BLASCHUK 301 W 77TH ST CHANHASSEN, MN 55317- CHRIS E & CAROLYN J HOOKER 6119 294TH STREET CT CANNON FALLS, MN 55009-9233 CHRISTOPHER EDWARD LARSON 512 LAREDO LN CHANHASSEN, MN 55317- CODY FLEISCHFRESSER 7551 GREAT PLAINS BLVD CHANHASSEN, MN 55317-9681 COLIN P PAARMANN 17845 IXONIA AVE LAKEVILLE, MN 55044- COURTNEY P DECKER 710 W VILLAGE RD APT 107 CHANHASSEN, MN 55317- DALE & KRISTINA LARSEN 404 76TH ST W CHANHASSEN, MN 55317-9603 DAVID & MEGAN L WOODS 509 CHAN VW CHANHASSEN, MN 55317- DAVID A & TERESA L BOETTCHER 7608 IROQUOIS CHANHASSEN, MN 55317-9604 DAVID B & BONNIE L MILLER 420 SANTA FE CIR CHANHASSEN, MN 55317-9792 DAVID G & KRISTI L HANS 406 SANTA FE CIR CHANHASSEN, MN 55317-9786 DAVID J & BARBARA HOWE 400 SANTA FE TRL CHANHASSEN, MN 55317-9765 DAVID LADD 15613 N LUND RD EDEN PRAIRIE, MN 55346-1548 DAVID M BUCKHOLZ 7541 CHIPPEWA TRL CHANHASSEN, MN 55317- DENIS F & ELIZABETH A SCHMIEG 7610 KIOWA AVE CHANHASSEN, MN 55317-9606 DENISE E PEPPE 730 WEST VILLAGE RD #104 CHANHASSEN, MN 55317-7532 DONALD D & MARY GOETZE 7610 FRONTIER TRL CHANHASSEN, MN 55317-9609 DOUGLAS J & WENDY K SUEDBECK REV TR 7605 GREAT PLAINS BLVD CHANHASSEN, MN 55317- DREW O BAUMGARTNER PO BOX 520 CHANHASSEN, MN 55317-0520 EDWARD B & LAURIE A HARKNESS 7602 HURON CHANHASSEN, MN 55317-9602 EDWARD D & JEANNE D WASLOSKY 517 LAREDO LN CHANHASSEN, MN 55317-9788 ELAINE D BJORNSON 7603 LAREDO DR CHANHASSEN, MN 55317-9611 ELIZABETH M SCHEUBLE 506 DEL RIO DR CHANHASSEN, MN 55317- ELOISE C LEIMER PO BOX 304 CHANHASSEN, MN 55317-0304 EMILY NAGEL 7603 IROQUOIS ST CHANHASSEN, MN 55317- FRANK FORMICO 5855 16TH ST S APT 4 SAINT PETERSBURG, FL 33705- FRANK FORMICO 19040 DUCK LAKE TRL EDEN PRAIRIE, MN 55346-2045 GARTH R & JILL K PETERSON 2946 13TH TER NW ST PAUL, MN 55112-6355 GARY G & REBECCA J BEEBE DEC TRUSTS 7484 SARATOGA DR CHANHASSEN, MN 55317-9771 GAYEN J COOK 7421 LONGVIEW CIR CHANHASSEN, MN 55317-9797 GBM REALTY SOUTHCROSS 500 W 79TH ST STE 400 CHANHASSEN, MN 55317- GEORGE & BERNADINE J BENIEK 412 76TH ST W CHANHASSEN, MN 55317-9603 77 GPW HOLDINGS LLC 1436 RYAN AVE W ROSEVILLE, MN 55113- GRANT GRIFFIN, MARY GRIFFIN, MARIA THERE 514 DEL RIO DR CHANHASSEN, MN 55317- HARISH RAMACHANDRAN 705 SANTA VERA DR CHANHASSEN, MN 55317-9644 HAVLIK FAMILY TRUST AGMT 513 CHAN VW CHANHASSEN, MN 55317- HOUCK INVESTMENTS LLC 776 APPLEWOOD CIR VICTORIA, MN 55386-8254 IVAN I MOKANYK 630 SANTA VERA DR CHANHASSEN, MN 55317- JACK GOGGINS 505 CHAN VW CHANHASSEN, MN 55317- JACK GROVES 700 W VILLAGE RD #107 CHANHASSEN, MN 55317- JAMES & JANET SCHINDLER 7606 HURON CHANHASSEN, MN 55317-9602 JAMES A & KIMBERLY J HOFFMAN 7570 CHIPPEWA TRL CHANHASSEN, MN 55317-9600 JAMES A & MARIANNE A MOLINE 507 DEL RIO DR CHANHASSEN, MN 55317-9770 JAMES G & MARY ANN GUNVILLE PO BOX 842 CHANHASSEN, MN 55317-0842 JAMES M ZIMMERMAN 7602 FRONTIER TRL CHANHASSEN, MN 55317- JENNIFER J JANDL 510 LAREDO LN CHANHASSEN, MN 55317-9788 JENNIFER L ROERICK 7604 GREAT PLAINS BLVD CHANHASSEN, MN 55317-7914 JENNIFER MADDEN FINKELSTEIN 402 DEL RIO DR CHANHASSEN, MN 55317- JENNIFER YANKOVEC 7506 DEBBIE LN EDEN PRAIRIE, MN 55346-4003 JENNY LASSI 7610 IROQUOIS ST CHANHASSEN, MN 55317-9604 JEREMY SHANE ASHBY 700 W VILLAGE RD #101 CHANHASSEN, MN 55317- JERRY CRAIG NETTLESHIP 760 WEST VILLAGE RD # 108 CHANHASSEN, MN 55317- JESSICA C ROME 7498 SARATOGA DR CHANHASSEN, MN 55317-9771 JESSICA ROJAS 418 SANTA FE CIR CHANHASSEN, MN 55317- JODY L BYLUND 700 W VILLAGE RD #103 CHANHASSEN, MN 55317- JODY R BUNKELMAN 7615 LAREDO DR CHANHASSEN, MN 55317-9611 JOHN A & ANN E CURTIS 410 SANTA FE CIR CHANHASSEN, MN 55317-9786 JOHN E CARLSON 411 HIGHLAND DR CHANHASSEN, MN 55317-9790 JOHN F & SHARON A BEAR 508 76TH ST W CHANHASSEN, MN 55317-7901 JOHN J & KATHLEEN HAGEDORN 516 LAREDO LN CHANHASSEN, MN 55317-9788 JOHN MCLEOD 7404 LAREDO DR CHANHASSEN, MN 55317- JOHN MICHAEL WIEGAND 408 W 76TH ST CHANHASSEN, MN 55317- JORDAN POSCH 511 LAREDO LN CHANHASSEN, MN 55317- JOSEPH BRETZ 2656 CLOVER FIELD CIR CHASKA, MN 55318- JOSEPH COX 414 SANTA FE TRL CHANHASSEN, MN 55317-9780 78 JOSEPH F & DELIA G WARNEKE 502 76TH ST W CHANHASSEN, MN 55317-7901 JOSEPH SHINE 405 DEL RIO DR CHANHASSEN, MN 55317-9777 JUDINE J REINHARDT 404 DEL RIO DR CHANHASSEN, MN 55317-7902 JUDITH SWIHART 7571 CHIPPEWA TRL CHANHASSEN, MN 55317- JUDSON PIETSCH 7560 CHIPPEWA TRL CHANHASSEN, MN 55317- JULIE STOVER 517 DEL RIO DR CHANHASSEN, MN 55317- KAI C THO 700 WEST VILLAGE RD # 102 CHANHASSEN, MN 55317-7524 KAREN J JEAPES 510 DEL RIO DR CHANHASSEN, MN 55317-9785 KAREN L ZELLER 7616 FRONTIER TRL CHANHASSEN, MN 55317- KARL & MARY ROLLAR 7550 CHIPPEWA TRL CHANHASSEN, MN 55317-9600 KATHERINE ROALSTAD 513 LAREDO LN CHANHASSEN, MN 55317-9788 KATHLEEN S FINGER 7604 HURON AVE CHANHASSEN, MN 55317-9602 KATIE E BENSON 740 VILLAGE RD W UNIT 102 CHANHASSEN, MN 55317- KATSIARYNA KRUHLIK 407 SANTA FE TRL CHANHASSEN, MN 55317- KELLI N SCHUTROP 315 W 77TH ST CHANHASSEN, MN 55317- KELLY A NEUMANN 7406 LAREDO DR CHANHASSEN, MN 55317-9781 KELLY ENGEBRETSON 7605 IROQUOIS CHANHASSEN, MN 55317-9604 KELSEY VIGGIANO 7440 LONGVIEW CIR CHANHASSEN, MN 55317- KENNETH C & DARCY N HALL PO BOX 215 CHANHASSEN, MN 55317-0215 KENNETH J & CHERYL R ANENSON 504 76TH ST W CHANHASSEN, MN 55317-7901 KENNETH M & LAURA A LARSON PO BOX 783 CHANHASSEN, MN 55317-0783 KEVIN GAFFORD 319 W 77TH ST CHANHASSEN, MN 55317- KEVIN J HEFEL 7591 CHIPPEWA TRL CHANHASSEN, MN 55317-9600 KHWICE PROPERTIES LLC 7269 PEARL DR CHANHASSEN, MN 55317- KIA M PEKARNA 417 SANTA FE TRL CHANHASSEN, MN 55317- KIRILL & SVETLANA BAK 7520 FRONTIER TRL CHANHASSEN, MN 55317-9610 KRISTA SCHULTE 424 SANTA FE CIR CHANHASSEN, MN 55317-9792 KUK YI 17858 FRUITWOOD LN EDEN PRAIRIE, MN 55347-3572 KYLE R ANDERSON 740 W VILLAGE RD #106 CHANHASSEN, MN 55317- LARRY A & KATHLEEN A SCHROEDER 7720 FRONTIER TRL CHANHASSEN, MN 55317-9753 LAURA ANN SWANSON 700 W VILLAGE RD APT 105 CHANHASSEN, MN 55317- LAURA LEE HEIM BAUMTROG PO BOX 296 CHANHASSEN, MN 55317-0296 LAUREN CARLSON 7608 HURON AVE CHANHASSEN, MN 55317- 79 LAURIE J RECOB 740 WEST VILLAGE RD # 105 CHANHASSEN, MN 55317-7533 LEANNE M ENGELKING 508 DEL RIO DR CHANHASSEN, MN 55317- LINDA K ELLEN RISE 632 SANTA VERA DR CHANHASSEN, MN 55317-9773 LINDA K HAIGHT LIVING TRUST 503 DEL RIO DR CHANHASSEN, MN 55317- LISA JACOBS, JOSEPH JACOBS, MONICA JACOB 406 W 76TH ST CHANHASSEN, MN 55317- LITTLE TREE PROPERTIES LLC 500 MARSCHALL RD SUITE 300 SHAKOPEE, MN 55379- LOEL B BROWN 5958 N TURKEY TROT LN STONE LAKE, WI 54876- LOGAN T DEVEREUX 730 WEST VILLAGE RD #102 CHANHASSEN, MN 55317- LYMAN A BRINK JR 3633 STRAWBERRY LN EXCELSIOR, MN 55331- MANDY S JOHANSEN 411 SANTA FE TRL CHANHASSEN, MN 55317-9791 MARK & ROSE ANN SCHLENK PO BOX 145 CHANHASSEN, MN 55317-0145 MARK A HAUKOOS 7561 GREAT PLAINS BLVD CHANHASSEN, MN 55317-9681 MARK D PATTERSON 408 SANTA FE CIR CHANHASSEN, MN 55317- MARK STAY 510 76TH ST W CHANHASSEN, MN 55317-7901 MARK W WETTERGREN 42238 371ST AVE SAINT PETER, MN 56082-4005 MATHEW A OLMSTED 720 WEST VILLAGE RD #104 CHANHASSEN, MN 55317- MATTHEW ETHERIDGE 419 SANTA FE TRL CHANHASSEN, MN 55317- MATTHEW LARSON 7601 GREAT PLAINS BLVD CHANHASSEN, MN 55317- MATTHEW MCMANUS 7276 TARTIN CURV EDEN PRAIRIE, MN 55346- MATTHEW R SPILANE 509 DEL RIO DR CHANHASSEN, MN 55317- MELROSE PLACE II INC 7287 FAWN HILL RD CHANHASSEN, MN 55317-8435 MICHAEL MEYERS 503 CHAN VW CHANHASSEN, MN 55317- MICHAEL P LUDKE 7613 IROQUOIS CHANHASSEN, MN 55317-9604 MICHAEL R PLACKO 403 DEL RIO DR CHANHASSEN, MN 55317- MICHELLE CHRISTOPHER 1904 MACGREGOR DR PLANO, TX 75093-4910 MICHELLE JUNE POWELL 7607 IROQUOIS ST CHANHASSEN, MN 55317-9604 MITCHELL J BOOS PO BOX 467 CHANHASSEN, MN 55317-0467 MONDAY NEST LLC 7730 LAREDO DR #74 CHANHASSEN, MN 55317- MOUNT OLIVET ROLLING ACRES 7200 ROLLING ACRES RD VICTORIA, MN 55386- NANCY CAMPBELL 402 76TH ST W CHANHASSEN, MN 55317-9603 NATE EORY 760 WEST VILLAGE RD # 102 CHANHASSEN, MN 55317-7535 PAMELA RENEE HALLDORSON 408 CIMARRON CIR CHANHASSEN, MN 55317- PATRICK WOOD 730 WEST VILLAGE RD #105 CHANHASSEN, MN 55317-7532 80 PAUL ALLYN STIBAL 500 CHAN VIEW CHANHASSEN, MN 55317- PAUL J OSEN 511 CHAN VW CHANHASSEN, MN 55317- PAUL LEWIS 7609 HURON AVE CHANHASSEN, MN 55317-9602 PINNOCK PROPERTIES LLC 2221 LUKEWOOD DR CHANHASSEN, MN 55317- PRADEEP PATIL 730 W VILLAGE RD #108 CHANHASSEN, MN 55317- QIANG NONG 780 SANTA VERA DR CHANHASSEN, MN 55317-9643 RACHEL M JEFFRIES 512 76TH ST W CHANHASSEN, MN 55317-7901 RALPH & MARGARET A FUHRMAN PO BOX 232 CHANHASSEN, MN 55317-0232 RAYMOND G AND ROSE A PEITZ REV TRUST PO BOX 744 CHANHASSEN, MN 55317- RAYMOND J & LYNETTE M BLEDSAW 7609 GREAT PLAINS BLVD CHANHASSEN, MN 55317-9768 RED FLOP TRUST 7609 IROQUOIS ST CHANHASSEN, MN 55317- RENEE DELOZIER 402 SANTA FE CIR CHANHASSEN, MN 55317- REUBEN & SANDRA KELZENBERG FAMILY TRUST 7604 IROQUOIS CHANHASSEN, MN 55317-9604 RICHARD & ANN MARIE HAGSTROM 7554 GREAT PLAINS BLVD CHANHASSEN, MN 55317-9680 RICHARD E & KATHIE ENGELHARDT 403 SANTA FE TRL CHANHASSEN, MN 55317-9765 RICHARD L & RENEE F CARLSON 7606 IROQUOIS CHANHASSEN, MN 55317-9604 RICKI LEE HALE 507 CHAN VW CHANHASSEN, MN 55317- ROBERT SCOTT POLLOCK 7603 GREAT PLAINS BLVD CHANHASSEN, MN 55317-9768 ROBERT T & SUSAN J WELLIVER 7611 HURON AVE CHANHASSEN, MN 55317- ROLO PROPERTIES LLC 730 WEST VILLAGE RD #101 CHANHASSEN, MN 55317-7532 RONALD A & KATHRYN A WHITEHEAD 7493 SARATOGA DR CHANHASSEN, MN 55317-9771 RONALD L & PATRICIA A MIELKE 405 SANTA FE TRL CHANHASSEN, MN 55317-9791 RONALD NORDQUIST 19010 LAKE AVE WAYZATA, MN 55391-3147 ROSS R & MARY JO KAMERUD 413 SANTA FE TRL CHANHASSEN, MN 55317-9780 RYAN BUYSSE 7602 KIOWA AVE CHANHASSEN, MN 55317- RYAN KELLEY 416 SANTA FE CIR CHANHASSEN, MN 55317- RYAN TOMAS 710 W VILLAGE RD UNIT 102 CHANHASSEN, MN 55317- SACHA LIVING TRUST 6260 NEAR MOUNTAIN BLVD CHANHASSEN, MN 55317-9113 SAMUEL O'HOWARD 415 SANTA FE TRL CHANHASSEN, MN 55317- SANDOR L EORY 400 76TH ST W CHANHASSEN, MN 55317-9603 SANDRA ILLETSCHKO 750 WEST VILLAGE RD #105 CHANHASSEN, MN 55317-7534 SANTA VERA APARTMENTS LLC 6757 KARMEN AVE NE ALBERTVILLE, MN 55301- SARA MIELKE 2087 SILVER ST WACONIA, MN 55387- 81 SCOTT H HUDLOW 770 WEST VILLAGE RD #101 CHANHASSEN, MN 55317-7536 SCOTT M BALLANTYNE 720 WEST VILLAGE RD #103 CHANHASSEN, MN 55317-7531 SCOTT M SCHMAEDEKE 514 LAREDO LN CHANHASSEN, MN 55317-9788 SELMA J PAYNE 7612 KIOWA AVE CHANHASSEN, MN 55317- SFR II BORROWER 2021-3 LLC 120 S RIVERSIDE PLZ SUITE 2000 CHICAGO, IL 60606- SHANDON N SULLIVAN 15041 N 2ND ST PHOENIX, AZ 85022- SHANNON MACK 7603 KIOWA AVE CHANHASSEN, MN 55317-9606 SHARON A IVERSON 19169 PLEASANTVIEW RD EDEN PRAIRIE, MN 55346- SHARON L EISCHENS PO BOX 852 CHANHASSEN, MN 55317-0852 SPRUCE PARTNERS LLC 5605 W 36TH ST STE 114C MINNEAPOLIS, MN 55416-2599 STACY D KATSIYIANNIS 412 SANTA FE TRL CHANHASSEN, MN 55317- STEFAN SZALKIEWICZ 511 DEL RIO DR CHANHASSEN, MN 55317- STEPHEN M & SUSAN R SAUTER 7441 LONGVIEW CIR CHANHASSEN, MN 55317-9797 STEVEN DEBELLA 720 WEST VILLAGE RD UNIT 102 CHANHASSEN, MN 55317- STEVEN W & BETTY M JORGENSON 401 SANTA FE TRL CHANHASSEN, MN 55317-9765 TERRA HOMES LLC 9487 GEISLER RD EDEN PRAIRIE, MN 55347- THE LEANNE K HARVIEUX LIVING TRUST 4023 S GOLDEN LYNX RD GREEN VALLEY, AZ 85614- THE MARJORIE JEANNE NASH LIVING TRUST 409 HIGHLAND DR CHANHASSEN, MN 55317-9790 THOMAS D HILK 760 WEST VILLAGE RD #105 CHANHASSEN, MN 55317-7535 THOMAS P & DIANE K LENTZ PO BOX 693 CHANHASSEN, MN 55317- TIMOTHY J & LISA A PESHEK 7605 KIOWA AVE CHANHASSEN, MN 55317- TIMOTHY J KOPISCHKE 5525 MAPLE HEIGHTS RD EXCELSIOR, MN 55331- TODD C WILLIAMS 7611 KIOWA AVE CHANHASSEN, MN 55317- TODD KAMMEIJER 307 W 77TH ST CHANHASSEN, MN 55317- TR OF HEATHER WALLES VAN BLYENBURGH 303 W 77TH ST CHANHASSEN, MN 55317- TRACY L & JANE M MESSER 7608 GREAT PLAINS BLVD CHANHASSEN, MN 55317-7914 TROY ANDERSON 7607 HURON CHANHASSEN, MN 55317-9602 TRUST AGREEMENT OF KAROL K NIELSEN 516 DEL RIO DR CHANHASSEN, MN 55317-9785 TRUSTEES OF TRUSTS 405 CIMARRON CIR CHANHASSEN, MN 55317- TURPEN FAMILY WEALTH TRUST 512 DEL RIO DR CHANHASSEN, MN 55317- VADIM IVANOVICH LAVRUSIK 2482 DOWNING AVE SHAKOPEE, MN 55379- VY NGUYEN 730 W VILLAGE RD APT 107 CHANHASSEN, MN 55317- WILLIAM DEAN BRANDT AND BARBARA HELEN BR 409 SANTA FE TRAIL CHANHASSEN, MN 55317- 82 WILLIAM DOUGLAS STAHOWIAK 710 WEST VILLAGE RD #103 CHANHASSEN, MN 55317-7530 WILLIAM F JOHN 7609 KIOWA AVE CHANHASSEN, MN 55317-9606 WILLIAM P HANSON 7607 GREAT PLAINS BLVD CHANHASSEN, MN 55317-9768 XENITH CAPITAL LLC 16715 12TH AVE N MINNEAPOLIS, MN 55447- YONGPING PU 9220 GATEWAY LN EDEN PRAIRIE, MN 55347- GREGORY S PESHEK 7521 CHIPPEWA TRL CHANHASSEN, MN 55317-9641 ADAM ISAAC SMITH 518 LAREDO LN CHANHASSEN, MN 55317-9788 COLEMAN MCCARTHY 503 HIGHLAND DR CHANHASSEN, MN 55317- BRANDON MICHAEL STUENESS 501 HIGHLAND DR CHANHASSEN, MN 55317- REV TR OF SHARON DUGSTAD 7476 SARATOGA DR CHANHASSEN, MN 55317- THE CONRAD A WINKEL LIVING TRUST 505 HIGHLAND DR CHANHASSEN, MN 55317- TAYLOR FREDRICK KERBER 7478 SARATOGA DR CHANHASSEN, MN 55317- BONYIN KING 7472 SARATOGA DR CHANHASSEN, MN 55317- STEVEN & REBECCA JOHNSON 7480 SARATOGA DR CHANHASSEN, MN 55317-9771 DENNIS L KARSTENSEN REV TRUST 7482 SARATOGO DR CHANHASSEN, MN 55317-9771 TIMOTHY NIEMEYER 7425 CHIPPEWA TRL CHANHASSEN, MN 55317- MATTHEW BERNA 7420 LONGVIEW CIR CHANHASSEN, MN 55317- KATHRYN MIKRES 7405 CHIPPEWA TRL CHANHASSEN, MN 55317- JAMES J MATTHEWS III 1454 NW 48TH LN BOCA RATON, FL 33431-3342 LARRY & JUDITH ANDERSON 400 CIMARRON CIR CHANHASSEN, MN 55317-9776 RUSS V & SONJA A RASCHKE 7402 FRONTIER TRL CHANHASSEN, MN 55317-9737 GEORGE & LEAH LUCAS 410 CIMARRON CIR CHANHASSEN, MN 55317-9776 DAVID CHADWICK PRATT JR 404 CIMARRON CIR CHANHASSEN, MN 55317- CHRISTOPHER R OLSON 402 CIMARRON CIR CHANHASSEN, MN 55317-9776 THOMAS A KERSTEN 7402 LAREDO DR CHANHASSEN, MN 55317-9781 JOEL A NYBECK 7404 FRONTIER TRL CHANHASSEN, MN 55317-9737 CURTIS J SOLIE 7473 SARATOGA DR CHANHASSEN, MN 55317-9771 KATHERINE L MCMILLAN 7481 SARATOGA DR CHANHASSEN, MN 55317- ELISABETH TRACEY DE LEON BLANKESTIJN 7470 SARATOGA DR CHANHASSEN, MN 55317- RICHARD D ZELLNER 7461 LONGVIEW CIR CHANHASSEN, MN 55317- NORMAN M & KRISTIN FRISBIE 7460 LONGVIEW CIR CHANHASSEN, MN 55317-9797 JOHN SAYER JR 7405 LAREDO DR CHANHASSEN, MN 55317-9781 JACOB & BRANDY ANFANG 413 CIMARRON CIR CHANHASSEN, MN 55317-9776 83 JAMES M & DENISE A VANASTEN 401 CIMARRON CIR CHANHASSEN, MN 55317-9776 BRUCE H MEYER 7420 CHIPPEWA TRL CHANHASSEN, MN 55317-9639 PAMELA P REID 7486 SARATOGA DR CHANHASSEN, MN 55317-9771 TODD WILLIAM HENRY 7471 SARATOGA DR CHANHASSEN, MN 55317-9771 DANA H & BETH E YOUNG 720 CHIPPEWA CIR CHANHASSEN, MN 55317-9642 ROBERT WEIDMAN 7468 SARATOGA DR CHANHASSEN, MN 55317- KENNETH FRANK 411 CIMARRON CIR CHANHASSEN, MN 55317-9776 QUINN J MCLAIN 409 CIMARRON CIR CHANHASSEN, MN 55317-9776 DAVID & LORENA MESEDAHL 407 CIMARRON CIR CHANHASSEN, MN 55317-9776 ELIZABETH FARNELL GROVER 7489 SARATOGA DR CHANHASSEN, MN 55317- DALE I & M LAMPA 403 CIMARRON CIR CHANHASSEN, MN 55317-9776 ROBERT W MCCURDY 7480 LONGVIEW CIR CHANHASSEN, MN 55317-9797 DOUGLAS R LAKES 740 CHIPPEWA CIR CHANHASSEN, MN 55317-9642 VINCENT R & CYNTHIA A JOHNSON 7469 SARATOGA DR CHANHASSEN, MN 55317-9771 THOMAS GEOFFROY 7460 FRONTIER TRL CHANHASSEN, MN 55317- NCHOLAS NEWMAN 7445 CHIPPEWA TRL CHANHASSEN, MN 55317-9641 THOMAS S & JOYCE HENDERSON 7488 SARATOGA DR CHANHASSEN, MN 55317-9771 FREDRICK PRESTON FISHER 507 LAREDO LN CHANHASSEN, MN 55317- ANDREA LEE SEURER 7440 CHIPPEWA TRL CHANHASSEN, MN 55317- JULIE S SWANSON 506 LAREDO LN CHANHASSEN, MN 55317-9788 COLIN ANDREW BROWN 7491 SARATOGA DR CHANHASSEN, MN 55317- SHAWN KELLY HAWS 505 LAREDO LN CHANHASSEN, MN 55317-9788 ANTHONY JONES III 7489 SARATOGA CIR CHANHASSEN, MN 55317- LEROY A KRUEGER 7470 FRONTIER TRL CHANHASSEN, MN 55317- CHERYL A TALBOT REV TRUST, JOHN TALBOT 7490 SARATOGA DR CHANHASSEN, MN 55317- BRANDON EDGETT 410 DEL RIO DR CHANHASSEN, MN 55317- ANDREW M DAVISON 408 DEL RIO DR CHANHASSEN, MN 55317-7902 ERIC MEIER 406 DEL RIO DR CHANHASSEN, MN 55317-7902 HENRY MARK & ANN C WEIS 400 DEL RIO DR CHANHASSEN, MN 55317-7902 LAYNE A ORTLOFF 508 LAREDO LN CHANHASSEN, MN 55317- JEFFREY D & CHRISTINA A STURM 504 LAREDO LN CHANHASSEN, MN 55317-9788 CARL BOHNSACK 412 DEL RIO DR CHANHASSEN, MN 55317- MICHELLE D SMITH 7487 SARATOGA CIR CHANHASSEN, MN 55317-9771 84 ERIN TANSEY 386 DEL RIO DR CHANHASSEN, MN 55317- JONATHON M BROWN 501 LAREDO LN CHANHASSEN, MN 55317- BRIAN H KASBOHM 7480 FRONTIER TRL CHANHASSEN, MN 55317- CYNTHIA KAY OLSON 751 CHIPPEWA CIR CHANHASSEN, MN 55317- LIEU NGUYEN 7485 CHIPPEWA TRL CHANHASSEN, MN 55317-9641 SCOTT C MCDONALD 7492 SARATOGA DR CHANHASSEN, MN 55317-9771 JUNU SHRESTHA 7480 CHIPPEWA TRL CHANHASSEN, MN 55317-9640 ASHLEY VOIGHT 502 LAREDO LN CHANHASSEN, MN 55317-9788 ALLISON NELSON 7495 SARATOGA DR CHANHASSEN, MN 55317- LINDA L HEBRINK 509 LAREDO LN CHANHASSEN, MN 55317- MATTHEW GARDNER 500 DEL RIO DR CHANHASSEN, MN 55317-9785 BRYAN PEDERSON 503 LAREDO LN CHANHASSEN, MN 55317- TIMOTHY J REMINGTON 381 DEL RIO DR CHANHASSEN, MN 55317- MARK B DAVIDSON 7500 FRONTIER TRL CHANHASSEN, MN 55317- JAMIE JOSEPH STUDNICKA 7497 SARATOGA DR CHANHASSEN, MN 55317-9771 MOLLY MONSON 7494 SARATOGA DR CHANHASSEN, MN 55317- MICHAL & IWONA T ANTOSZ 7495 CHIPPEWA TRL CHANHASSEN, MN 55317-9641 JAY WALLIN 7490 CHIPPEWA TRL CHANHASSEN, MN 55317-9640 JUDITH ANN MEYER 7499 SARATOGA DR CHANHASSEN, MN 55317-9771 BRIAN R LANDE 391 DEL RIO DR CHANHASSEN, MN 55317- HONG CA 7491 SARATOGA CIR CHANHASSEN, MN 55317-7900 DAVID LEMKE 7500 CHIPPEWA TRL CHANHASSEN, MN 55317-9640 VICTOR A & SUSAN M HALLBERG 411 DEL RIO DR CHANHASSEN, MN 55317-9777 WAYNE G & SHARON L SKOBLIK 409 DEL RIO DR CHANHASSEN, MN 55317-9777 PAUL T & SUSAN J HOLOVNIA 407 DEL RIO DR CHANHASSEN, MN 55317-9777 TODD GRIGSBY OLIVER 413 DEL RIO DR CHANHASSEN, MN 55317-9777 ADRIAN W & KELLI E BAINES 502 DEL RIO DR CHANHASSEN, MN 55317-9785 DEREK M FAUTSCH 521 LAREDO LN CHANHASSEN, MN 55317-9788 TRI NGUYEN 520 LAREDO LN CHANHASSEN, MN 55317- DEREK EDWARD LACHELT MELLOTT 7501 CHIPPEWA TRL CHANHASSEN, MN 55317- JAY E & SALLY JOHNSON 7496 SARATOGA DR CHANHASSEN, MN 55317-9771 RINJI SHERPA 7493 SARATOGA CIR CHANHASSEN, MN 55317- BRENT KOTTKE 7510 LAREDO DR CHANHASSEN, MN 55317- 85 JESSICA PIKE 501 DEL RIO DR CHANHASSEN, MN 55317- CRAIG & LARIE ANDERSON 519 LAREDO LN CHANHASSEN, MN 55317-9788 TYLER A DOWNS JR 7510 FRONTIER TRL CHANHASSEN, MN 55317- CHRISTINA STEINMETZ 760 SANTA VERA DR CHANHASSEN, MN 55317- BRIAN N & DIANE L LIPSIUS 740 SANTA VERA DR CHANHASSEN, MN 55317-9643 GREGORY A FELTMAN 7520 CHIPPEWA TRL CHANHASSEN, MN 55317- JON A & ELIZABETH NYLAND 7550 GREAT PLAINS BLVD CHANHASSEN, MN 55317-9680 THOMAS V & NANCY G MANARIN 7552 GREAT PLAINS BLVD CHANHASSEN, MN 55317-9680 JEFFREY HOOPES 7336 FRONTIER TRL CHANHASSEN, MN 55317-9778 JAMES J & RITA M WALETSKI 7334 FRONTIER TRL CHANHASSEN, MN 55317-9778 CALAH LYNN RIES HANSEN 7332 FRONTIER TRL CHANHASSEN, MN 55317- ANDREW R HANEY 404 HIGHLAND DR CHANHASSEN, MN 55317-5325 DAN W WEATHERLY 406 HIGHLAND DR CHANHASSEN, MN 55317- TED D & CHERYL A TIGUE 408 HIGHLAND DR CHANHASSEN, MN 55317-9790 CRAIG A & MARIAN WESTERMANN 410 HIGHLAND DR CHANHASSEN, MN 55317-9790 JAMES C & KATHRYN C MURPHY 502 HIGHLAND DR CHANHASSEN, MN 55317-9789 JERRY BUCKNER 7360 LONGVIEW CIR CHANHASSEN, MN 55317- NICHOLAS JOSEPH GREENWOOD 7381 LONGVIEW CIR CHANHASSEN, MN 55317- JANET K CLEVELAND 7380 LONGVIEW CIR CHANHASSEN, MN 55317-7905 KEVIN GRISWOLD 7401 LONGVIEW CIR CHANHASSEN, MN 55317-9797 MICHAEL PAUL BOLEN 7400 LONGVIEW CIR CHANHASSEN, MN 55317- COREY J & HEATHER M KOHNEN 405 HIGHLAND DR CHANHASSEN, MN 55317-9790 DAVID R LEPPER 7321 LONGVIEW CIR CHANHASSEN, MN 55317-7905 REBECCA HACKBARTH 7320 LONGVIEW CIR CHANHASSEN, MN 55317- CHARLES & JEAN ROBBINS 7340 LONGVIEW CIR CHANHASSEN, MN 55317-7905 ADAM D ERICKSON 7361 LONGVIEW CIR CHANHASSEN, MN 55317-7905 ALFRED H & JANE M CLAGUE 7226 FRONTIER TRL CHANHASSEN, MN 55317-9782 JAMES & LINDA MADY 7338 FRONTIER TRL CHANHASSEN, MN 55317-9778 MICHAEL R SHAY 7230 FRONTIER TRL CHANHASSEN, MN 55317- PAUL & ELLEN DIFFERDING 7228 FRONTIER TRL CHANHASSEN, MN 55317-9782 THE ANDERSON LIVING TRUST 7340 FRONTIER TRL CHANHASSEN, MN 55317- PATRICIA A JOHNSON 400 HIGHLAND DR CHANHASSEN, MN 55317-9790 CAROL HARMER 402 HIGHLAND DR CHANHASSEN, MN 55317-9790 86 PETER D & JILL M SCHMIDT 500 HIGHLAND DR CHANHASSEN, MN 55317-9789 LADINN & SANG M HAK 504 HIGHLAND DR CHANHASSEN, MN 55317-9789 SCOTT OPATZ 506 HIGHLAND DR CHANHASSEN, MN 55317- JOHN & JANICE RAGAN 7367 LONGVIEW CIR CHANHASSEN, MN 55317-7905 EUGENE A & JANE F FOURNIER 507 HIGHLAND DR CHANHASSEN, MN 55317-9789 CHARLES C & BONNIE B COFFEE REV LIV TR 2909 PANCHOS WAY THE VILLAGES, FL 32162-0168 BONNIE JEAN NELSON 401 HIGHLAND DR CHANHASSEN, MN 55317- LADANG MENG & DARY HAK 403 HIGHLAND DR CHANHASSEN, MN 55317-9790 MYRA J LUCAS 700 WEST VILLAGE RD #201 CHANHASSEN, MN 55317-7589 DONALD DUDZIAK 720 WEST VILLAGE RD #201 CHANHASSEN, MN 55317-7588 SCOTT EDWIN BAILEY 371 JOANNA DR CHANHASSEN, MN 55317- CHARLES PEARSON 351 JOANNA DR CHANHASSEN, MN 55317- LUIS BERROSPID 391 JOANNA DR CHANHASSEN, MN 55317- IND SCHOOL DIST 112 11 PEAVEY RD CHASKA, MN 55318- 87 AFFIDAVTI OF PUBLICATION STATE OF MTNNESOTA ) COUNTY OF HENNEPIN CITY OF CHANHASSEN CARVER & HENNEPIN COUNTIES NOTICE OF PUBLIC HEARING PLANNING CASE NO.2025-07 NOTICE lS HEREBY GIVEN that the Ghanhassen Planning Commis- sion will hold a public hearing on Tuesday, August 12, 2025, at 6:00 p.m. in the Council Ghambers in Chanhassen City Hall, 7700 Market Bfud. The purpose of this hearing is to consider rBquests i€lated to constructing two additional apart- m€nt buildings, a 16-unit and a 12-unit building, on property gen- erally located at 621 Santa Vera Drive. Prcperty Orvner Santa V6ra Apanments, LLC; Applicant: Head- waters. Project documents for this request are available for public roview on tho city's w6bsit6at www.chanhassenmn.gov/ oroposeddevelopments or at City Hall during regular business hours. All interested peEons are invited to attend this public hearing and exprEss their opinions with r€spocl to this proposal. Rachel Jeske Planner Email: rjeskeochanhassenmn. gov Phone:962-227-1137 Published in the Sun Sailor July 31, 2025 1lE3150 ss I do solemly s\ilear that the noticq as per the proof, was published in the edition of the SS Mtka Excelsior-Eden Prairie with the known offrce of issue being located in the county of: HENNEPIN with additional circulation in the counties of: HENNEPIN and has full knowledge of the facts stated below: (A) The newspapor has complied with all of the requirements constituting qualifica- tion as a qualified newspaper as provided by Minn. Stat. $331A.02. (B) This Public Notice was printed and pub- lished in said newspaper(s) once each week, for I successive week(s); the first insertion being on 0713112025 and the last insertion being on 0713112025. MORTGAGE FORECLOSURE NOTICTS Pursuant to Minncsota Stat. $580.033 relating to the publication of mortgage foreclosure notices: The newspaper complies with the conditions described in 0580.033, subd. l, clause (l) or (2). If the newspaper's known oflice of issue is located in a county adjoining tle county where the mortgaged premises or some part of the mortgaged premises described in the notice are located, a substantial portion of the newspaper's circulation is in the latter county. Designated Agent Subscribed and sworn to or affrrmed before me on07l3ll2025 Notary Public Rate lnformation: (l) Lowest classified rate paid by commercial users for comparable space: $999.99 per column inch Ad rD 1483150 88 Planning Commission Item August 12, 2025 Item POSTPONED Minnewashta Apartments Rezoning and Site Plan Review (Planning Case 25-11) File No.Item No: B.2 Agenda Section PUBLIC HEARINGS Prepared By Amy Weidman, Senior Admin Support Specialist Applicant Present Zoning Land Use Acerage Density Applicable Regulations SUGGESTED ACTION N/A. This item will not be discussed on August 12. SUMMARY BACKGROUND The city, development team, and MnDOT are working to identify interim traffic solutions prior to the construction of a roundabout. A new public hearing and review will be announced when the date is finalized. It is tentatively scheduled for September 16. DISCUSSION 89 RECOMMENDATION ATTACHMENTS 90 Planning Commission Item August 12, 2025 Item Approve Planning Commission Meeting Minutes dated June 3, 2025 File No.Item No: D.1 Agenda Section APPROVAL OF MINUTES Prepared By Amy Weidman, Senior Admin Support Specialist Applicant Present Zoning Land Use Acerage Density Applicable Regulations SUGGESTED ACTION "The Chanhassen Planning Commission approves its June 3, 2025 meeting minutes" SUMMARY BACKGROUND DISCUSSION RECOMMENDATION 91 "The Chanhassen Planning Commission approves its June 3, 2025 meeting minutes" ATTACHMENTS Planning Commission Meeting Minutes dated June 3, 2025 92 CHANHASSEN PLANNING COMMISSION REGULAR MEETING MINUTES JUNE 3, 2025 CALL TO ORDER: Chairman Noyes called the meeting to order at 6:00 p.m. MEMBERS PRESENT: Chairman Eric Noyes, Steve Jobe, Jeremy Rosengren, Ryan Soller, Mike Olmstead, Dave Grover, and Katie Trevena. MEMBERS ABSENT: None. STAFF PRESENT: Rachel Arsenault, Associate Planner; Joe Seidl, Water Resources Specialist; Breanne Rothstein, Consulting Planner. PUBLIC PRESENT: John Gilbert 1641 Jeurissen Lane Tom Shaver Inland Development Team Jacquel Hajder Inland Development Team ESG Architect Representative PUBLIC HEARINGS: 1. Avienda Apartments Preliminary Plat and Site Plan Review (Planning Case 25-08) Rachel Arsenault, Associate Planner, introduced Planning Case #25-08 for the Avienda Apartments Preliminary Plat and Site Plan Review. The case is scheduled for the City Council on June 23. The proposed location is near Lyman and Powers. The land is zoned planned unit development, and the land designation is office and commercial. Mrs. Arsenault reviewed the communication up to this point, including a City Council Work Session on March 24, 2025, a neighborhood meeting on March 25, 2025, and a notice of the public hearing mailed to all property owners within 500 feet. She reviewed the greater Avienda PUD, which included 768 approved united, 39 detached townhomes, 52 rowhomes, 412 apartments, and 264 additional units that could be built. She said that the senior housing development is no longer planned. She reviewed the level of city discretion in decision-making. She stated that the staff reviewed seven considerations for subdivision approval and found that all were met. She reviewed the preliminary plat and noted that they were platting one lot, with the remainder of the 37 acres designated as an outlot. She said anything that comes forward from the outlot would need to be replatted and presented to the Planning Commission. She provided context for the site plan review and noted that it was updated yesterday, so the staff had not fully reviewed it to make sure it met all the conditions. She said that the site plan in the agenda packet was the original version in which the staff conditions were created. She 93 Planning Commission Minutes – June 3, 2025 2 commented that the pedestrian connectivity was highlighted in the site plan review because that is a large part of the Avienda Development. She said that the development team had already worked toward some of the conditions to allow public access easements to provide public benefit for anyone living in the Avienda Development. The site plan shows a pet park and connecting trails on the north end of the site, along with public parking and an entrance to the garage. She reviewed the middle of the site plan, which provided parking and pedestrian access around the building. She reviewed the south end, which provides another pet park and trails to walk around. She summarized the landscape plan and said that there is berming on the north side, which would create a visual interest. She stated that the courtyard was a large part of the landscaping for the development. She commented that the south end of the development mirrored the north side with trees and berming. Mrs. Arsenault summarized the parking requirements for different unit types and commented that the city is requiring 726 parking spaces, 412 of which are to be covered underground spaces. She stated that the developer was providing 736 parking spaces, but 101 of those spaces would be considered proof of parking. She explained the layout of the floor plan and the underground parking garage. She commented that the underground parking garage would contain the trash rooms and the utility areas. She reviewed the architecture for the outside of the building and the rendering photos. She said that the Avienda Design Guidelines are recommendations, not requirements, but that the design drivers are timeless architecture, earth-tone color palates, inclusive opportunities to relax and gather, and pedestrian accessibility. She explained that certain concept materials were used most often in the project, and she provided material samples at the podium. She stated that the Avienda Design Guidelines referenced material classification, which includes natural stone, architecturally pre-cast panels, and wood. Joe Seidl, Water Resources Specialist, discussed the grading and drainage. He said that the area was previously graded with the larger Avienda build-out. He stated that there was a high point in the center of the site, which directed stormwater to the north to be picked up in a temporary basin and conveyed to the northwest via storm sewer or to the south through drainage swales to a temporary basin, which drains to Lake Susan. He noted that there is the planned Avienda row homes development, which has the best management practice highlighted in pink and was stabilized with vegetation. He said that the project was required to meet city and Riley Purgatory Bluff Creek Watershed District Requirements for water quality, rate control, and water volume. He said that the proposed design includes stormwater ponds and best management practices to promote infiltration, filtration, and stormwater storage. He said that the stormwater site was outlined in the Apartment’s stormwater management report and a master report. He reviewed the stormwater master plan, which was a road map to guide how the stormwater would be managed for the entire site to allow for fewer and larger best management practices. He said that there would be more assets if there were smaller, but best management practices, so the regional plan would think on a large scale of how the stormwater would naturally run along the site. He stated that there would be extra complexity with the Avienda Apartment buildout, because the stormwater for their site needs to meet standards and they are using portions of the master stormwater plan, so the plans have to talk with one another and consider the maintenance for the best management practices and both plans would have to go through permitting at the same time. 94 Planning Commission Minutes – June 3, 2025 3 Mr. Seidl summarized the proposed conditions for the grading and drainage and said that the storm sewer would be built and convey water to a pickup point to be captured and conveyed by the master stormwater drainage to a best management practice on the north side of the buildout. He said a temporary basin would be reconfigured into an underground system. He said that the underground system would primarily treat the stormwater from the public roadway and would be conveyed to the northwest. He noted that this would be a better picture of the Avienda Rowhomes buildout, and the stormwater would have to work with this design. He stated that there was an emergency overflow route planned through the southern portion of the site. He said that the center courtyard acts like a bowl and would inhibit an overflow path, so they would need to find a solution, such as a redundant pipe that was sized correctly, if the primary pipe was not functional. He discussed the stormwater challenges, including navigating the master plan and making sure that there was an accounting exercise completed based on the impervious area created, the amount of treatment in the best management practice remaining, and how to route them. He discussed the challenge with the relocation of the best management practice and undergrounding it. He said that the best management practice was alleviating stress downstream to temporarily store stormwater. He asked if a temporary reroute was necessary, and they would need to study the potential impacts with the city. He discussed the design of the overflow system and the maintenance of the best management practices. He said that there are engineering solutions that need to be implemented. Commissioner Rosengren asked about the proof of parking spaces. He said that the plan looked like the areas were spread around the outside edges of where the parking lots would go. He asked if these areas would be paved but not have parking lines until they are needed. Mrs. Arsenault answered that the parking spots would be planned, but they would not be pre-paved. She said that they would be graded properly so they could change it into parking, but there would be landscaping in the interim to be used for the site currently. Commissioner Rosengren asked if there would be an impact on the water plan if they paved additional areas for parking. Mr. Seidl answered that the city would have to review whether the parking was reconfigured. He said it was not uncommon for either an emergency overflow route to go over a parking lot, or for there to be an underground pipe solution. Commissioner Rosengren clarified that nothing major would impact the plan. Commissioner Jobe asked what the trigger would be for when parking would be added. Mrs. Arsenault answered that parking was only required to be constructed if and when they find a need for the spaces. She said if the city receives repeated, reported issues, they will work with the developer to construct the parking. Commissioner Jobe asked about the water flow, since this was a design-as-you-go. He asked how much flexibility that allowed to change things for the next addition. Mr. Seidl answered that the fundamentals of the plan would not change much. He said that when he looked at a master plan, there would be a large, best management practice in a general area to capture and convey water from the developments. The main goal of the individual development was to figure out how to route the stormwater to the best management practice and to make sure they were still 95 Planning Commission Minutes – June 3, 2025 4 sized correctly. He said if there was a change, the master stormwater plan would have to re- permit itself. Chairman Noyes asked if the last part to be developed might be stuck with a situation they could not deal with based on minor tweaks. Mr. Seidl answered that the city needs to regulate each project. The nice thing is that the area is fairly built out, so there is not a lot of the impervious area to go higher than what was planned for. He said that the biggest risk was if there were no credits left, but the risk was low if it was managed correctly. He stated that there were two sets of regulatory eyes looking at the project. Chairman Noyes asked if the undeveloped parking was considered impervious or pervious in the calculation. Mrs. Arsenault answered that it was considered impervious. Commissioner Jobe asked if the sod would be required to prevent nitrates from going into stormwater areas. Mrs. Arsenault answered that there was not a requirement for specific sod planting, but there were landscaping requirements reviewed by the Natural Resource Specialist. These items would include ensuring enough tree plantings and species diversity. Commissioner Olmstead said that there was a slide in the site plan that calculated for hammerheads on the northwest and southwest corners for ambulance turnaround, but there was not good coverage on the west side of the building, which would have the best management practice for the rowhomes and a small, private lane. He asked if fire was acceptable to that. Mrs. Arsenault answered that the fire had reviewed the plans and had no conditions. Commissioner Trevena requested to review the east-west paths for future retail. She said it was just on this parcel, and the retail developer would have additional responsibility. Mrs. Arsenault confirmed and answered that this development provided multiple connections to the commercial area. Commissioner Olmstead asked if traffic control would be a part of the final review. He asked about the four-way stop and if it would be required. Mrs. Arsenault answered that it would be a part of the traffic study that the development team would have to complete and update. Mr. Seidl clarified that this would be like the stormwater plan, and there were outlined uses, but as the individual uses of parcels were known, they could update the traffic study. They could condition an upgrade if it was necessary for whatever development triggered the upgrade. Commissioner Olmstead said it worried him when plans were piecemealed. He said the regulators would have to look into the future to help the next person. Commissioner Soller asked about the marked yellow trails on the plan and interconnectedness. He asked if they are to be privately maintained areas or if they were public sidewalks. Mrs. Arsenault answered that the outermost ring was designed to ADA standards and city standards, so the public could use it. She would have to double-check with the engineering department about who oversaw the maintenance. 96 Planning Commission Minutes – June 3, 2025 5 Commissioner Soller said that it was designed with the intent to allow for public foot traffic, not just a benefit for the residents of the building. Mrs. Arsenault confirmed that this was the intent, and this was a large part of the Avienda review and design guidelines. Chairman Noyes asked if the pedestrian areas left the development and how they would meet up with the next development in appropriate places. Mrs. Arsenault answered that it was a best- guess assumption, but they can make a good guess based on the traffic. She said that the developer only had to construct one path on the east side because there was no reason to go east a couple of feet to their property line if they did not know where it would connect with commercial developments in the future. Commissioner Grover asked if some of the paths went through the proof of parking areas. Mrs. Arsenault answered that the developer would have to reconstruct the sidewalks in front of where the proof of parking space would go and there is sufficient space to do so. Commissioner Rosengren clarified that the proof of parking was all or nothing. Mrs. Arsenault answered that the proof of the parking agreement wording could be further worked through in the development contract. She said that the 101 parking spots would meet the minimum requirements for the City Code. Commissioner Jobe asked if the proof of parking was like an escrow account and how soon they would know if they needed the proof of parking. Jacquel Hajder of Inland Development Partners, LLC team said that the proof of parking came from a portfolio of projects they already had that were from similar markets and had 95 to 98 percent occupancy. She said that they did not want to overbuild, but they did not want to have an excess of hard surfaces, which are not as good for the environment. She said they typically see a need for 1.5 parking spots per unit. She stated that they look at how many stalls they have per bedroom. They have 1.1 parking stalls per bedroom. She said it took about 18 to 24 months to see the building occupied and to understand the parking needs. She said they have a management company that oversees the parking to make sure one resident is not storing many cars. Commissioner Trevena asked about the EV readiness was limited to 20 percent of the interior stalls. She asked if there was a timeline or threshold to increase the amount. Jacquel Hajder that EV-ready meant providing conduits and transformers to allow for twenty percent of the parking to be electric vehicle charging. Ten percent of the stalls would already be completed. She said many buildings are not yet meeting the demand for electric vehicle charging. Chairman Noyes opened the public hearing. John Gilbert, 1641 Jeurissen Lane, said he appreciated the complexity of the water movement. He thought the incremental changes still worried him and that someone would be left holding the bag. He looked back at the previous approval of row homes and the 500-foot pond. He asked if anyone considered moving the water from the courtyard. He said he endorsed approving the project with conditions. He said that the water was driven to a location that was not being voted on tonight. He stated that there were several renditions of what the developer wanted to see for Avienda. He commented that there was a community center in earlier plans seen in the watershed 97 Planning Commission Minutes – June 3, 2025 6 documents. He asked if there were any other options to move water to the 500-foot pond. He said he would love to see the courtyard mirrored on the east side of the property, since that was originally presented to the community. He read some references and asked if the developer was trying to get the city to commit to the pond because they need the water moved there. He asked if there were any other options available. He said that the grading plan showed a courtyard to the basins. He stated that the Avienda Quad was cited in the landscaping plan. He thought there would be very little water flow going through the area right now, and if there were any other solutions. He asked if the city could come up with a longer-term plan, and that they were being shortsighted. Chairman Noyes closed the public hearing. Chairman Noyes recognized that it was a fluid project, and the Planning Commission built safeguards in for further reviewing and further opportunities for public discussion for future projects. He said that the discussion would continue as other parts of Avienda were developed, whether it was as simple as walking paths or as complicated as water movement. Commissioner Olmstead asked if the 46 comments were the conditions of approval. Mrs. Arsenault confirmed that the 46 comments were the conditions of approval that would need to be addressed before coming forward for the final plat. Even when it comes to the final plat, they do another plan review, which could include additional conditions. Commissioner Olmstead clarified that the developer had sent in updates that addressed some of the conditions. Mrs. Arsenault confirmed this information. Commissioner Olmstead moved, Commissioner Jobe seconded that the Chanhassen Board of Appeals and Adjustments approves the requested preliminary plat and site plan review subject to the conditions of approval and adopt the attached Findings of Fact and Recommendation. All voted in favor and the motion carried with a vote of 7-0. GENERAL BUSINESS: None. APPROVAL OF MINUTES: 1. APPROVAL OF PLANNING COMMISSION MINUTES DATED MAY 20, 2025 Commissioner Grover noted that he had a small change. He said that on top of page four, the word “attached” should be included in front of the phrase auxiliary dwelling unit. Mrs. Arsenault confirmed the change. Commissioner Grover moved, Commissioner Jobe seconded to approve the Chanhassen Planning Commission summary minutes dated May 20, 2025, as corrected above. All voted in favor, and the motion carried unanimously with a vote of 7-0. COMMISSION PRESENTATIONS: None. 98 Planning Commission Minutes – June 3, 2025 7 ADMINISTRATIVE PRESENTATIONS: Breanne Rothstein introduced herself and explained that she was filling in for Community Development Director Maass. CORRESPONDENCE DISCUSSION: None. OPEN DISCUSSION: None. ADJOURNMENT: Commissioner Rosengren moved, Commissioner Soller seconded, to adjourn the meeting. All voted in favor, and the motion carried unanimously with a vote of 7 to 0. The Planning Commission meeting was adjourned at 6:55 p.m. Submitted by Rachel Arsenault Associate Planner 99