Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Civil and Landscape Plans_2025-07-22
DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\COVER SHEET.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N PRELIMINARY PLANSCLIENT:ENGINEER/LANDSCAPE ARCHITECT:ARCHITECT:MINNEWASHTA APARTMENTSSHEET INDEX:FOR:VICINITY MAP- NOT TO SCALEC1.0COVER SHEETMEASURE GROUP - PETE MOREAU, PE (MN)PO BOX 10WAYZATA, MN 55391PH: 612-440-0934EMAIL: PMOREAU@MEASUREGRP.COMMEASURE GROUP - JOSH MCKINNEY, PLA (MN)PO BOX 10WAYZATA, MN 55391PH: 612-440-0934EMAIL: JMCKINNEY@MEASUREGRP.COMHEADWATERS6757 KARMEN AVEALBERTVILLE, MNPH: 612-508-4627EMAIL: RCS@HEADWATERS.BUILDSHEET #SHEET NAMEC1.0COVER SHEETC2.0DEMOLITION PLANC3.0SITE PLANC4.0GRADING PLANC5.0UTILITY PLANC5.1STORM SEWER PLANC6.0PHASE 1 EROSION CONTROLC6.1PHASE 2 EROSION CONTROLC7.0SWPPP NARRATIVEC7.1SWPPP NARRATIVEC8.0CIVIL DETAILS - UTILITY DETAILSC8.1CIVIL DETAILS - STORM SEWER DETAILSC8.2CIVIL DETAILS - ADA DETAILSC8.3CIVIL DETAILS - SITE DETAILSL0.1TREE INVENTORYL1.0LANDSCAPE PLANKAAS WILSON ARCHITECTS - KIM BEHRENS1301 AMERICAN BLVD.BLOOMINTON, MN 55425PH: 612-279-8917EMAIL: KIMB@KAASWILSON.COMSITEMN H W Y 4 1 - H A Z E L T I N E B L V D MINNETONKAMIDDLE SCHOOLMN HWY 7 MIN N E S O T A H I G H W A Y N O . 4 1 ( H A Z E L T I N E B L V D ) ORIOLE AVENUE OEOEOEOE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G||WLWLWL REMOVE SHEDREMOVE STAIRSREMOVE CURBREMOVE & SALVAGEHYDRANT FOR FUTURE USESALVAGE TRASH ENCLOSUREFOR REUSE ON SITEDescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\DEMOLITION PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC2.0DEMOLITION PLANLEGENDEXISTINGPROPOSEDPROPERTY BOUNDARYLOT LINESETBACK LINERIGHT OF WAY LINEEASEMENTSTANDARD CURB AND GUTTERFENCERETAINING WALLSCALE IN FEET080401.DEMOLITION NOTES ARE NOT COMPREHENSIVE. CONTRACTOR SHALL VISIT THE SITE PRIOR TOCONSTRUCTION TO OBTAIN A CLEAR UNDERSTANDING OF THE INTENDED SCOPE OF WORK.2. THE DESIGN SHOWN IS BASED ON ENGINEER'S UNDERSTANDING OF EXISTING CONDITIONS.THE EXISTING CONDITIONS SHOWN ON THIS PLAN ARE BASED UPON ALTA AND TOPOGRAPHICMAPPING PREPARED BY XXXX DATED XX-XX-XXXX. IF CONTRACTOR DOES NOT ACCEPTEXISTING TOPOGRAPHY AS SHOWN ON THE PLANS WITHOUT EXCEPTION, CONTRACTOR SHALLHAVE MADE, AT OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYORAND SUBMIT IT TO THE OWNER FOR REVIEW.3. THE CONTRACTOR IS RESPONSIBLE FOR DEMOLITION, REMOVAL, AND DISPOSING INALOCATION APPROVED BY ALL GOVERNING AUTHORITIES AND IN ACCORDANCE WITHAPPLICABLE CODES, OF ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING,DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ONTHE PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TOSUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PERTHE GEOTECHNICAL REPORT AND/OR GEOTECHNICAL ENGINEER.4.CLEARING AND GRUBBING: CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROMTHE SITE AND DISPOSING THE DEBRIS IN A LAWFUL MANNER. CONTRACTOR IS RESPONSIBLEFOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL.5.. CONTRACTOR IS RESPONSIBLE FOR THE DISCONNECTION OF UTILITY SERVICES TO EXISTINGBUILDINGS PRIOR TO DEMOLITION OF THE BUILDINGS.6. CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO REMOVALAND/OR RELOCATION OF UTILITIES. CONTRACTOR SHALL COORDINATE WITH UTILITYCOMPANIES CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITYCOMPANIES' FORCES AND ANY FEES WHICH ARE TO BE PAID TO UTILITY COMPANIES FORSERVICES. CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES.7. CONTRACTOR IS SPECIFICALLY CAUTIONED THAT LOCATIONS OF EXISTING UTILITIES SHOWNON THIS PLAN HAVE BEEN DETERMINED FROM INFORMATION AVAILABLE. ENGINEER ASSUMESNO RESPONSIBILITY FOR THE UTILITY MAPPING ACCURACY. PRIOR TO START OF ANYDEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES 48 HOURS PRIORTO ANY EXCAVATION FOR ON-SITE LOCATIONS OF EXISTING UTILITIES. THE LOCATIONS OFUTILITIES SHALL BE OBTAINED BY THE CONTRACTOR BY CALLING MINNESOTA GOPHER STATEONE CALL AT 800-252-1166 OR651-454-0002.8.THE MAPPING LOCATION OF ALL EXISTING SEWERS, PIPING, AND UTILITIES SHOWN ARE NOT TOBE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT MAY OCCUR ONTHE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANYANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTIONAND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH WORK.UTILITIES DETERMINED TO BE ABANDONED SHALL BE REMOVED IF UNDER THE BUILDINGINCLUDING 10' BEYOND FOUNDATIONS.9.ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BEREMOVED OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY.ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THEUTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE.CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN THE ROAD RIGHTOF WAY DURING CONSTRUCTION.10.CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES,ENCLOSURES, ETC., TO THE BEST PRACTICES.11.CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALLTIMES DURING DEMOLITION OF THE EXISTING FACILITIES12.PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLEDAND APPROVED BY THE LOCAL AUTHORITY.13.CONTRACTOR SHALL LIMIT SAW-CUT & PAVEMENT REMOVAL TO ONLY THOSE AREAS WHEREIT IS REQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS INCURREDON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FORITS REMOVAL AND REPAIR.14.CONTRACTOR TO PROTECT EXISTING FEATURES WHICH ARE TO REMAIN. DAMAGE TO ANYEXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE.15.ABANDON OR REMOVE ALL SANITARY, WATER AND STORM SERVICES PER CITY STANDARDS.COORDINATE ALL WORK WITH CITY. ALL STREET RESTORATION SHALL BE COMPLETED INCOMPLIANCE WITH LOCAL STANDARDS.16.CONTRACTOR SHALL PREPARE AND SUBMIT TO THE GOVERNING AUTHORITY A TRAFFICAND/OR PEDESTRIAN TRAFFIC PLAN PER CITY/COUNTY/STATE STANDARDS TO BE APPROVEDBY THE LOCAL GOVERNING AUTHORITY.DEMOLITION NOTES 3 STORYMULTIFAMILY44 UNITSFFE: 1011.00GFE: 1000.33HYDSTORMWATERFILTRATION BASINTOP BERM: 995.00EO: 994.50HWL:994.39BOT:989.00BOT(SAND):985.25WLWLWL DDDPROPOSED PUBLICDRAINAGE, UTILITY ANDROADWAY EASEMENT9ABBAA4522340.0'116.8'8818.0'24.0'18.0'10.0'R10.0'R5.0'R37.0'R63.0'26.0'294.2'11771020.0'MIN N E S O T A H I G H W A Y N O . 4 1 ( H A Z E L T I N E B L V D ) ORIOLE AVENUE 6.0'7R20.0'R76.0'R20.0'11C666726.0'9910111111DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\SITE PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC3.0SITE PLANLEGENDDEVELOPMENT SUMMARYKEYNOTESB6-12 CURB & GUTTER1ZONING INFORMATIONCURRENT SITE ZONING:PROPOSED SITE ZONING:SITE DATATOTAL SITE AREA:DENSITYTOTAL UNITS:DENSITY:BUILDING SETBACKSFRONT:SIDE:REAR:PARKINGENCLOSEDEXTERIORTOTALSITE PARKING RATIOPARKING DIMENSIONSSTALL DIMENSIONSDRIVE AISLE WIDTHIMPERVIOUS SURFACEREQUIREDPROPOSEDRSFR-85.60 ACRES20'20'10'44 STALLS44 STALLS88 STALLS44 STALLS44 STALLS88 STALLS2 STALLSPER UNIT2 STALLSPER UNIT19.3%9x18'24'9'x18'24'&26'8 UPA MAX44 UNITS8 UPAADA SIGNAGE & BOLLARDS - SEE CIVIL DETAILS2ADA PARKING STRIPING - SEE CIVIL DETAILS34FLUSH CURB5CONCRETE SIDEWALK67RETAINING WALL WITH FENCE8CURB TAPERMATCH EXISTINGPROPOSEDPROPERTY BOUNDARYSETBACK LINERIGHT OF WAY LINEEASEMENTSTANDARD CURB AND GUTTERHEAVY DUTY BITUMINOUS PAVEMENTLIGHT DUTY BITUMINOUS PAVEMENTCONCRETE SIDEWALKHEAVY DUTY CONCRETE PAVEMENTFENCERETAINING WALL (BY OTHERS)TRAFFIC SIGNLIGHT POLESCALE IN FEET08040ARCHITECTURAL STOOP - COORDINATE WITH STRUCTURALDESIGN BY OTHERSAB116.8'40'294.2'50% MAXCLIGHT POLE WITH FOUNDATIONFIRE LANE - NO PARKING SIGNAGESTOP SIGN9END CONCRETE CURB, START BITUMINOUS EDGE10WETLAND BUFFER SIGNAGE - MCWD REQUIREMENT11 MIN N E S O T A H I G H W A Y N O . 4 1 ( H A Z E L T I N E B L V D ) ORIOLE AVENUE OEOEOEOE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G||3 STORYMULTIFAMILY44 UNITSFFE: 1011.00GFE: 1000.33HYDSTORMWATERFILTRATION BASINTOP BERM: 995.00EO: 994.50HWL:994.39BOT:989.00BOT(SAND):985.25WLWLWL DDDSSSPROPOSED PUBLICDRAINAGE, UTILITY ANDROADWAY EASEMENTLODLODLOD LOD LOD LODLODLOD LOD LOD LOD LOD LODLODL O D L O D L O DLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLODLODLODLODLO D LO D LO D LO D LO D LO D LO D LO D LO D LO D -1.6%-4 .9% -1.4% -1.7%-1.6%-33.3%-2.3%-2.0%-5.0%-2.4 %-2.0%-2.0%-33.3%-24.4%-33.3%-7.5%-33.5%-27.5%-33.3%-2.2%-7.5%-5.1%-6.5%-10.0%-4.5%-1.5% -2.0%-4.5%-2.5%-33.3%-33.3% 10 1 9 1 0 2 0 10 2 11012101310141015101610171 0 1 8 101910201016 1017 1018 10161017101898498598698798898998798898999098910229959969979989991000100110021003100410051006100710081009 10101011101210071008 1009 1010 101 1 1012 1013 1014 10151001100299699799899910001001 9951017 1018 1010 1011 1011101510 2 1 10101011 985985995995989995989995996982985979990995990980990995980985990995995988989985990995993989995996 9849939919899919961010100810091000 1015101610131014-3 .8%1011.001011.001011.001011.001009.801009.001007.50 TW1001.00 BW1000.23999.83999.801000.101000.001000.001010.501011.001008.951009.501009.651009.651009.901009.901010.001009.701010.001013.101012.901012.501018.901018.501016.351020.30 M.E.1007.70 E.O.1007.501007.601007.201017.201018.501002.40 TW1001.90 BW1000.90 BW1007.00 TW997.00 BW1008.50 TW1012.20 BW1013.20 TW996.50 BW1010.80 TW1010.00 BW1012.00 TW1010.251010.601010.201009.001018.271018.001005.80 TW1004.80 TW1017.001018.371013.901014.001010.601010.801010.701011.701011.801009.721009.551009.45994.50 E.O.1000.101000.001000.001000.001000.001000.101010.501010.001010.001010.501009.901009.901022.101022.101011.001009.201009.801011.301008.901008.751008.401009.601009.001008.661009.101009.051011.001010.921010.60995.00996.00995.00995.00995.00995.00995.00995.00995.00995.00995.00995.00995.001012.001012.201012.001017.501019.301018.60 M.E.10171018-0.6%101710181010.20 E.O.1010.501010.50DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\GRADING PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC4.0GRADING PLANLEGENDGRADING NOTES1.LOCATIONS AND ELEVATIONS OF EXISTING TOPOGRAPHY AND UTILITIES ASSHOWN ON THIS PLAN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFYSITE CONDITIONS AND UTILITY LOCATIONS PRIOR TOEXCAVATION/CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELYIF ANY DISCREPANCIES ARE FOUND.2.CONTRACTORS SHALL REFER TO ARCHITECTURAL PLANS FOR EXACTLOCATIONS AND DIMENSIONS OF VESTIBULE, SLOPED PAVEMENT, EXITPORCHES, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS, EXACTBUILDING UTILITY ENTRANCE LOCATIONS, AND EXACT LOCATIONS ANDNUMBER OF DOWNSPOUTS.3.ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF"STANDARD SPECIFICATIONS FOR TRENCH EXCAVATION ANDBACKFILL/SURFACE RESTORATION" AS PREPARED BY THE CITY ENGINEERSASSOCIATION OF MINNESOTA.4.ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE SIX INCHES OF TOPSOIL ANDSOD OR SEED. THESE AREAS SHALL BE WATERED UNTIL A HEALTHY STAND OFGRASS IS OBTAINED. SEE LANDSCAPE PLAN FOR PLANTING AND TURFESTABLISHMENT.5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAININGTRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS,DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OFTRAFFIC WHERE NECESSARY. PLACEMENT OF THESE DEVICES SHALL BEAPPROVED BY THE ENGINEER PRIOR TO PLACEMENT. TRAFFIC CONTROLDEVICES SHALL CONFORM TO APPROPRIATE MNDOT STANDARDS6.ALL SLOPES SHALL BE GRADED TO 3:1 OR FLATTER, UNLESS OTHERWISEINDICATED ON THIS SHEET.7.CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADINGAND PROVIDE A SMOOTH FINISHED SURFACE WITH UNIFORM SLOPES BETWEENPOINTS WHERE ELEVATIONS ARE SHOWN OR BETWEEN SUCH POINTS ANDEXISTING GRADES.8.SPOT ELEVATIONS SHOWN INDICATE FINISHED PAVEMENT ELEVATIONS &GUTTER FLOW LINE UNLESS OTHERWISE NOTED. PROPOSED CONTOURS ARETO FINISHED SURFACE GRADE.9.SEE SOILS REPORT FOR PAVEMENT THICKNESSES AND HOLD DOWNS.10.CONTRACTOR SHALL DISPOSE OF ANY EXCESS SOIL MATERIAL THAT EXISTSAFTER THE SITE GRADING AND UTILITY CONSTRUCTION IS COMPLETED. THECONTRACTOR SHALL DISPOSE OF ALL EXCESS SOIL MATERIAL IN A MANNERACCEPTABLE TO THE OWNER AND THE REGULATING AGENCIES.11.CONTRACTOR SHALL PROVIDE A STRUCTURAL RETAINING WALL DESIGNCERTIFIED BY A LICENSED PROFESSIONAL ENGINEER.12.ALL CONSTRUCTION SHALL CONFORM TO LOCAL, STATE AND FEDERAL RULESINCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM(NPDES) PERMIT REQUIREMENTS.13.PRIOR TO PLACEMENT OF ANY STRUCTURE OR PAVEMENT, A PROOF ROLL, ATMINIMUM, WILL BE REQUIRED ON THE SUBGRADE. PROOF ROLLING SHALL BEACCOMPLISHED BY MAKING MINIMUM OF 2 COMPLETE PASSES WITHFULLY-LOADED TANDEM-AXLE DUMP TRUCK, OR APPROVED EQUAL, IN EACH OF2 PERPENDICULAR DIRECTIONS WHILE UNDER SUPERVISION AND DIRECTION OFTHE INDEPENDENT TESTING LABORATORY. AREAS OF FAILURE SHALL BEEXCAVATED AND RE-COMPACTED AS SPECIFIED HEREIN.14.EMBANKMENT MATERIAL PLACED BENEATH BUILDINGS AND STREET OR PARKINGAREAS SHALL BE COMPACTED IN ACCORDANCE WITH THE SPECIFIED DENSITYMETHOD AS OUTLINED IN MNDOT 2105.3F1 AND THE REQUIREMENTS OF THEGEOTECHNICAL ENGINEER.15.EMBANKMENT MATERIAL NOT PLACED IN THE BUILDING PAD, STREETS ORPARKING AREA, SHALL BE COMPACTED IN ACCORDANCE WITH REQUIREMENTSOF THEORDINARY COMPACTION METHOD AS OUTLINED IN MNDOT 2105.3F2.16.ALL SOILS AND MATERIALS TESTING SHALL BE COMPLETED BY AN INDEPENDENTGEOTECHNICAL ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVINGUNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THEGEOTECHNICAL ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FORCOORDINATING ALL REQUIRED SOILS TESTS AND INSPECTIONS WITH THEGEOTECHNICAL ENGINEER.SCALE IN FEET08040PROPERTY BOUNDARYEXISTING CONTOURPROPOSED CONTOURSETBACK LINERIGHT OF WAY LINEEASEMENTSTANDARD CURB AND GUTTERSTORM SEWERFLARED END SECTIONRETAINING WALLDRAINTILEGRADING LIMITSSPOT ELEVATIONFLOW DIRECTIONEMERGENCY OVERFLOWLODD-1.50%1000.00E.O.SPOT ELEV. LABELSM.E.=MATCH EXISTINGTW=TOP OF WALLBW=BOTTOM OF WALLTC=TOP OF CURB MIN N E S O T A H I G H W A Y N O . 4 1 ( H A Z E L T I N E B L V D ) ORIOLE AVENUE OEOEOEOE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G||3 STORYMULTIFAMILY44 UNITSFFE: 1011.00GFE: 1000.33HYDSTORMWATERFILTRATION BASINTOP BERM: 995.00EO: 994.50HWL:994.39BOT:989.00BOT(SAND):985.25WLWLWL |||| | ||||| |||||DDDSSSPROPOSED PUBLICDRAINAGE, UTILITY ANDROADWAY EASEMENT150'8" COMBINEDFIRE & DOMESTIC SERVICECOORD. W/ MEP8"X6" TEE6" GAVE VALVEAND HYDRANT8" 45° BEND8" GATE VALVE8" SANITARY SERVICE STUBCOORD. W/ MEPIE=1002.3MH-3RIM: 1009.40INV(S): 1001.4INV(N): 1001.3MH-2RIM: 1012.00INV(S): 998.94INV(E): 998.84MH-1DROP MH*RIM: 1014.00INV(W): 994.6INV(E): 991.10CORE DRILL AND CONNECTTO EXISTING MANHOLE*RIM:1012.00INV(S): 989.82*INV(N): 989.72*CONTRACTOR TO CONFIRMEXISTING INV. AND NOTIFYENGINEER IF A DISCREPANCY EXISTS64 LF -8" PVC @ 2.00%217 LF -8" PVC @ 2.00%44 LF -8" PVC @ 2.00%118 LF -8" PVC @ 2.00%8" 45° BEND8" 45° BEND8" 45° BEND8" 45° BENDCONNECT TO EXISTING(1) 8"X8" TEE(1) 8" GATE VALVEPER CITY STANDARDSEXISTING HYDRANTTO BE RELOCATED8" 45° BEND &8" 22.5° BEND1234DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\UTILITY PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC5.0UTILITY PLANLEGENDUTILITY NOTES1.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATIONOF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THEVARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTS TAKEN IN THE FIELD. THEINFORMATION SHALL NOT BE RELIED ON AS BEING EXACT OR COMPLETE. THECONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION ANDNOTIFY THE OWNER OR ENGINEER OF DISCREPANCIES.2.ALL SANITARY SEWER, STORM SEWER AND WATER MAIN MATERIAL AND INSTALLATIONSSHALL BE PER CITY REQUIREMENTS, MINNESOTA PLUMBING CODE, AND IN ACCORDANCEWITH THE CURRENT EDITION OF THE STANDARD UTILITIES SPECIFICATION AS PREPAREDBY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM).3.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN THE NECESSARY FEDERAL,STATE AND LOCAL PERMITS FOR THE PROPOSED WORK OR VERIFY WITH THE OWNER ORENGINEER THAT PERMITS HAVE BEEN OBTAINED. PERMIT FEES SHALL BE THERESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE ARRANGED WITH THE OWNER.4.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION ANDDIMENSIONS OF DOORWAYS, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS,AND EXACT BUILDING UTILITY CONNECTION LOCATIONS.5.ALL PRIVATE UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THESPECIFICATIONS OF THE APPROPRIATE UTILITY COMPANY. THE CONTRACTOR SHALLCOORDINATE THE SERVICE LINE CONSTRUCTION WITH THE UTILITY COMPANIES.6.CONTRACTOR SHALL OBTAIN ALL NECESSARY CITY PERMITS FOR UTILITY CONNECTIONSAND UTILITIES SHALL BE INSPECTED AND APPROVED BY THE CITY. THE CITY SHALL BENOTIFIED 48-HOURS PRIOR TO COMMENCING WITH THE UTILITY CONSTRUCTION OR ANYREQUIRED TESTING. CONTRACTOR SHALL NOT OPERATE, INTERFERE WITH, CONNECT ANYPIPE OR HOSE TO, OR TAP ANY WATER MAIN BELONGING TO THE CITY UNLESS DULYAUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF SCHEDULED ORUNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBLIC ARE TO BE THE RESPONSIBILITYOF THE CONTRACTOR.7.PROVIDE WATER MAIN THRUST RESTRAINTS PER CITY STANDARD REQUIREMENTS.8.PER MINNESOTA DEPARTMENT OF LABOR & INDUSTRY REQUIREMENTS, A MINIMUM OF 18INCHES OF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION IS REQUIREDFROM WATERMAIN TO ANY MANHOLE, SEPTIC SYSTEM, CATCH BASIN, SEWER PIPE, OROTHER SOURCE OF CONTAMINATION, MEASURED FROM THE OUTER EDGE OF THE PIPE TOTHE OUTER EDGE OF THE CONTAMINATION SOURCE UNLESS OTHERWISE SHOWN.9.UTILITY SERVICES TYPICALLY TERMINATE 5' OUTSIDE BUILDING WALL UNLESS OTHERWISESHOWN OR NOTED.10.WATERMAIN PIPE SHALL EITHER BE AWWA C900 PVC WITH DUCTILE IRON FITTINGS ANDRISERS, OR DIP CLASS 52.11.ALL WATER LINES SHALL HAVE 8' MINIMUM COVER (TOP OF PIPE TO FINISH GRADE).INSULATE WATER MAIN IF LESS THAN 8' OF COVER. INSULATION SHALL BE DOWSTYROFOAM HI BRAND 35 OR EQUIVALENT, WITH 4 INCHES OF THICKNESS.12.SANITARY SEWER PIPE OUTSIDE THE BUILDING ENVELOPE THAT IS 8" OR GREATER SHALL BEPOLYVINYL CHLORIDE (PVC) SDR 26. SCHEDULE 40 MUST BE USED IS THE PIPE IS 6" ORSMALLER. C900 IS REQUIRED FOR DEPTHS GREATER THAN 20 FEET. SANITARY SEWER PIPEWITHIN 5 FEET OF THE BUILDING AND UNDER FOOTINGS SHALL BE SCHEDULE 40 PERASTM D2665. ALL PLASTIC SANITARY SEWER SHALL BE INSTALLED PER D2321. SOLVENTWELD JOINTS MUST INCLUDE USE OF A PRIMER WHICH IS OF A CONTRASTING COLOR TOTHE PIPE AND CEMENT. ALL SANITARY SEWER SHALL BE TESTED COMPLIANT TO CURRENTMINNESOTA PLUMBING CODE.13.STORM SEWER PIPE:13.1.HDPE OR POLYPROPYLENE PIPE MAY BE INSTALLED WITH APPROVAL OF LOCALGOVERNING AGENCIES.13.2.HDPE STORM PIPE 4- TO 60-INCHES IN DIAMETER SHALL MEET REQUIREMENTS OFASTM F2648. FITTINGS SHALL BE PER ASTM F2306 AND INSTALLED PER ASTM D2321.13.3.POLYPROPYLENE STORM PIPE 12- TO 60-INCHES IN DIAMETER SHALL MEETREQUIREMENTS OF ASTM F2881. APPROVED FITTINGS SHALL MEET JOINTPERFORMANCE REQUIREMENTS OF ASTM D3212. AT PIPE JOINTS, THE SPIGOT SHALLUTILIZE TWO GASKETS MEETING THE REQUIREMENTS OF ASTM F477. INSTALL INACCORDANCE WITH ASTM D2321.13.4.PVC STORM SEWER PIPE AND FITTINGS SHALL BE SCHEDULE 40 PIPE PER ASTM D2665AND INSTALLED PER ASTM D2321.13.5.IF REQUIRED BY AHJ, REINFORCED CONCRETE PIPE SHALL BE CLASS 5 FOR PIPEDIAMETERS 18" AND SMALLER AND CLASS 3 FOR PIPE DIAMETERS 21" AND LARGERUNLESS OTHERWISE NOTED, PER ASTM C76 WITH R-4 GASKETS.14.ALL PORTIONS OF SANITARY & STORM SEWER SYSTEMS, INCLUDING STRUCTURES,LOCATED WITHIN 10-FEET OF A BUILDING AND/OR WATER LINE SHALL BE TESTED INACCORDANCE WITH MINNESOTA RULES, PART 4714 AND CURRENT MINNESOTAPLUMBING CODE.PROPOSEDPROPERTY BOUNDARYEASEMENTCURB AND GUTTERWATER MAINHYDRANTGATE VALVESANITARY SEWERSTORM SEWERFLARED END SECTION W/ RIP RAP & TRASH GUARDDRAINTILERETAINING WALLGASUNDERGROUND ELECTRICOVERHEAD ELECTRICTELEPHONE/FIBERLIGHT POLE|||GGUEUTSCALE IN FEET08040SUTILITY CROSSING TABLECROSSING #UPPER UTILITY BOTTOMOF PIPELOWER UTILITY TOPOF PIPE1STORM = 1004.52SAN = 1001.372WM = 1003.37SAN = 999.623STORM = 1004.90SAN = 999.214STORM = 1004.16WM = 1000.63DOE MIN N E S O T A H I G H W A Y N O . 4 1 ( H A Z E L T I N E B L V D ) ORIOLE AVENUE OEOEOEOE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G||3 STORYMULTIFAMILY44 UNITSFFE: 1011.00GFE: 1000.33HYDSTORMWATERFILTRATION BASINTOP BERM: 995.00EO: 994.50HWL:994.39BOT:989.00BOT(SAND):985.25WLWLWL |||||||||||||||DDDSSSPROPOSED PUBLICDRAINAGE, UTILITY ANDROADWAY EASEMENTSTUB FOR FUTURE CONNECTIONINV: 1013.20STMH-101RIM: 971.00INV(E): 965.50INV(SW): 961.00122 LF - 15" HDPE @ 3.30%FES-100INV: 957.00OCS-103 (SEE DETAIL)RIM: 994.00 TO 995.00TOP WEIR WALL: 994.0015" R.C. ORIFICE: 991.00(15") INV(E): 989.50(DT) INV: 985.50INV(W): 981.00FES-104INV: 989.00FES-200INV: 993.00STMH-102RIM: 981.00INV(E): 975.50INV(W): 971.0045 LF - 15" HDPE @ 12.20%45 LF - 15" HDPE @ 12.20%14 LF - 15" HDPE @ -3.50%CB-201RIM: 1003.50(24") INV(E): 995.30(24") INV(W): 995.30SUMP: 992.30STMH-202RIM: 1006.40(12") INV(S): 1003.80(24") INV(E): 1001.00(24") INV(W): 997.00STMH-203RIM: 1015.90(24") INV(E): 1007.30(24") INV(W): 1007.30CB-301RIM: 1007.20(12") INV(N): 1003.90(12") INV(SE): 1003.90SUMP: 1000.90CB-302RIM: 1008.90(12") INV(E): 1004.35(12") INV(NW): 1004.35SUMP: 1001.35STMH-303RIM: 1010.10(12") INV(S): 1004.60(12") INV(W): 1004.60DRAIN BASIN-304RIM: 1009.00(12") INV(N): 1005.00SUMP: 1002.0086 LF - 12" HDPE @ 0.50%46 LF - 12" HDPE @ 0.50%91 LF - 12" HDPE @ 0.50%20 LF - 18" HDPE @ 0.50%150 LF - 24" HDPE @ 3.90%160 LF - 24" HDPE @ 3.90%46 LF - 24" HDPE@ 3.80%61 LF - 24" HDPE@ 3.80%CLASS III RIP RAP|||GGUEUTSCALE IN FEET08040SDescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\UTILITY PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC5.1STORM SEWER PLANLEGENDPROPOSEDPROPERTY BOUNDARYEASEMENTCURB AND GUTTERWATER MAINHYDRANTGATE VALVESANITARY SEWERSTORM SEWERFLARED END SECTION W/ RIP RAP & TRASH GUARDDRAINTILERETAINING WALLGASUNDERGROUND ELECTRICOVERHEAD ELECTRICTELEPHONE/FIBERLIGHT POLEDOESTORM SEWER NOTES1.STORM SEWER PIPE:1.1.HDPE OR POLYPROPYLENE PIPE MAY BE INSTALLED WITH APPROVAL OF LOCAL GOVERNINGAGENCIES.1.2.HDPE STORM PIPE 4- TO 60-INCHES IN DIAMETER SHALL MEET REQUIREMENTS OF ASTMF2648. FITTINGS SHALL BE PER ASTM F2306 AND INSTALLED PER ASTM D2321.1.3.POLYPROPYLENE STORM PIPE 12- TO 60-INCHES IN DIAMETER SHALL MEET REQUIREMENTS OFASTM F2881. APPROVED FITTINGS SHALL MEET JOINT PERFORMANCE REQUIREMENTS OFASTM D3212. AT PIPE JOINTS, THE SPIGOT SHALL UTILIZE TWO GASKETS MEETING THEREQUIREMENTS OF ASTM F477. INSTALL IN ACCORDANCE WITH ASTM D2321.1.4.PVC STORM SEWER PIPE AND FITTINGS SHALL BE SCHEDULE 40 PIPE PER ASTM D2665 ANDINSTALLED PER ASTM D2321.1.5.IF REQUIRED BY AHJ, REINFORCED CONCRETE PIPE SHALL BE CLASS 5 FOR PIPE DIAMETERS 18"AND SMALLER AND CLASS 3 FOR PIPE DIAMETERS 21" AND LARGER UNLESS OTHERWISENOTED, PER ASTM C76 WITH R-4 GASKETS.FOR GENERAL UTILITY NOTES, SEE SHEET C5.0. MIN N E S O T A H I G H W A Y N O . 4 1 ( H A Z E L T I N E B L V D ) ORIOLE AVENUE OEOEOEOE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G||STORM BASINTOP BERM: 995.00EO: 994.70HWL:993.68BOT:989.00PER AS-BUILTS,30" RCPIE +/-957.00wetland is 957.00 to 958.0030" RCP@0.46%LODLODLOD LOD LOD LODLODLOD LOD LOD LOD LOD LODLODLO D L O D L O DLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLODLODLODLODLODLODLODLO D LO D LO D LO D LO D LO D LO D LO D LO D LO DWLWLWL INSTALL ROCK ENTRANCEPER CIVIL DETAILSINSTALL SILT FENCEPER CIVIL DETAILSDescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\EROSION CONTROL PLANS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC6.0PHASE 1EROSIONCONTROLLEGENDPROPOSEDPROPERTY BOUNDARYINDEX CONTOURINTERVAL CONTOURSETBACK LINERIGHT OF WAY LINEEASEMENTSTANDARD CURB AND GUTTERSTORM SEWERFLARED END SECTIONWATER MAINSANITARY SEWERRETAINING WALLDRAINTILEGRADING LIMITSSPOT ELEVATIONFLOW DIRECTIONEMERGENCY OVERFLOWWALL LABEL|LODSCALE IN FEET08040DEROSION CONTROL NOTES1.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/ORELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ONRECORDS OF THE VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTSTAKEN IN THE FIELD. THE INFORMATION SHALL NOT BE RELIED ON AS BEINGEXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONSPRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OR ENGINEER OFDISCREPANCIES.2.ALL SILT FENCE AND OTHER EROSION CONTROL FEATURES SHALL BE IN-PLACEPRIOR TO ANY EXCAVATION/CONSTRUCTION AND SHALL BE MAINTAINEDUNTIL VIABLE TURF OR GROUNDCOVER HAS BEEN ESTABLISHED. EXISTING SILTFENCE ON-SITE SHALL BE MAINTAINED AND OR REMOVED AND SHALL BECONSIDERED INCIDENTAL TO THE GRADING CONTRACT. IT IS OF EXTREMEIMPORTANCE TO BE AWARE OF CURRENT FIELD CONDITIONS WITH RESPECTTO EROSION CONTROL. TEMPORARY PONDING, DIKES, HAYBALES, ETC.,REQUIRED BY THE CITY SHALL BE INCIDENTAL TO THE GRADING CONTRACT.3.EROSION AND SILTATION CONTROL (ESC): THE CONTRACTOR SHALL ASSUMECOMPLETE RESPONSIBILITY FOR CONTROLLING ALL SILTATION AND EROSIONOF THE PROJECT AREA. THE CONTRACTOR SHALL USE WHATEVER MEANSNECESSARY TO CONTROL THE EROSION AND SILTATION INCLUDING BUT NOTLIMITED TO: CATCH BASIN INSERTS, CONSTRUCTION ENTRANCES, EROSIONCONTROL BLANKET, AND SILT FENCE. ESC SHALL COMMENCE WITH GRADINGAND CONTINUE THROUGHOUT THE PROJECT UNTIL ACCEPTANCE OF THEWORK BYTHE OWNER. THE CONTRACTOR'S RESPONSIBILITY INCLUDES ALLIMPLEMENTATION AS REQUIRED TO PREVENT EROSION AND THE DEPOSITINGOF SILT. THE OWNER MAY DIRECT THE CONTRACTOR'S METHODS AS DEEMEDFIT TO PROTECT PROPERTY AND IMPROVEMENTS. ANY DEPOSITION OF SILT ORMUD ON NEW OR EXISTING PAVEMENT OR IN EXISTING STORM SEWERS ORSWALES SHALL BE REMOVED AFTER EACH RAIN EVENT. AFFECTED AREAS SHALLBE CLEANED TO THE SATISFACTION OF THE OWNER, ALL AT THE EXPENSE OFTHE CONTRACTOR. ALL TEMPORARY EROSION CONTROL SHALL BE REMOVEDBY THE CONTRACTOR AFTER THE TURF IS ESTABLISHED.4.ALL STREETS DISTURBED DURING WORKING HOURS MUST BE CLEANED AT THEEND OF EACH WORKING DAY. A CONSTRUCTION ENTRANCE TO THE SITE MUSTBE PROVIDED ACCORDING TO DETAILS TO REDUCE TRACKING OF DIRT ONTOPUBLIC STREETS.5.PROPOSED PONDS SHALL BE EXCAVATED FIRST AND USED AS TEMPORARYPONDING DURING CONSTRUCTION.6.WHEN INSTALLING END-OF-LINE FLARED END SECTIONS, BRING THE SILT FENCEUP & OVER THE FLARED END SECTIONS & COVER DISTURBED AREAS WITH RIPRAP. THE UPSTREAM FLARED END SECTIONS SHALL HAVE WOOD FIBER BLANKETINSTALLED ON THE DISTURBED SOILS.7.ALL UNPAVED AREAS ALTERED DUE TO CONSTRUCTION ACTIVITIES MUST BERESTORED WITH SEED AND MULCH, SOD, EROSION CONTROL BLANKET OR BEHARD SURFACED WITHIN 2 WEEKS OF COMPLETION OF CONSTRUCTION.8.THE SITE MUST BE STABILIZED PER THE REQUIREMENTS OF THE MPCA, NPDES,MNDOT, AND CITY.A. TEMPORARY (GREATER THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 22-111AT 30.5-POUNDS PER ACRE.B. TEMPORARY (LESS THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 21-112(FALL) OR 21-111 (SPRING/SUMMER) AT 100-POUNDS PER ACREC.INFILTRATION/FILTRATION BASIN SHALL BE MNDOT SEED MIX 34-262 AT14.5-POUNDS PER ACRE.D. POND SLOPES SHALL BE MNDOT SEED MIX 33-261 AT 35-POUNDS PER ACRE.E. GENERAL SEEDING SHALL BE MNDOT SEED MIX 25-151 AT 70-POUNDS PERACRE.F. MULCH SHALL BE MNDOT TYPE 1 APPLIED AT 2-TONS PER ACRE.9.FOR AREAS WITH SLOPES OF 3:1 OR GREATER, RESTORATION WITH SOD OREROSION CONTROL BLANKET IS REQUIRED.10.ALL TEMPORARY STOCKPILES MUST HAVE SILT FENCE INSTALLED AROUNDTHEM TO TRAP SEDIMENT.11.ALL PERMANENT PONDS USED AS TEMPORARY SEDIMENT BASINS DURINGCONSTRUCTION SHALL BE DREDGED AFTER THE SITE HAS BEEN STABILIZED TORESTORE THE POND TO THE PROPOSED BOTTOM ELEVATION.12.ALL CONSTRUCTION SHALL CONFORM TO LOCAL AND STATE RULESINCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM(NPDES) PERMIT REQUIREMENTS.13.THE SITE MUST BE KEPT IN A WELL-DRAINED CONDITION AT ALL TIMES. THECONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING, OROTHER MEANS REQUIRED TO INSURE PROPER DRAINAGE DURINGCONSTRUCTION. LOW POINTS IN ROADWAYS OR BUILDING PADS MUST BEPROVIDED WITH A POSITIVE OUTFLOW. MIN N E S O T A H I G H W A Y N O . 4 1 ( H A Z E L T I N E B L V D ) ORIOLE AVENUE OEOEOEOE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G||STORM BASINTOP BERM: 995.00EO: 994.70HWL:993.68BOT:989.00PER AS-BUILTS,30" RCPIE +/-957.00wetland is 957.00 to 958.0030" RCP@0.46%LODLODLOD LOD LOD LODLODLOD LOD LOD LOD LOD LODLODL O D L O D L O DLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLODLODLODLODLODLODLODLO D LO D LO D LO D LO D LO D LO D LO D LO D LO D -1.6%-4. 9% -1.4% -1.7%-1.6%-33.3%-2.3%-2.0%-5.0%-2.4%-2.0%-2.0%-33.3%-24.4%-33.3%-7.5%-33.5% -27 .5% -33. 3 % -2.2% -7.5 %-5.1%-6.5%-10.0%-4.5% -1.5% -2.0%-4.5%-2.5%-33.3% -33.3% 1019 10 2 0 102 1 1012 1013101410151016101710 1 8 1019 102 0 1016 1017 1018 10 1610171018 984985986987988989987988989990989 10229959969979989991000100110021003 1004 1005 1006 1007 1008 1009 1010101110121007 1008 1009 1010 1011 1012 1013 1014 10151001100299699799899910001001 9951017 1018 1010 1011 101110151021 1010 1011 985985995995989995989995996982985979990995 990980990995980985990995995988989985990995993989995 996 9849939919899919961 0 1 0100810091000 1015101610131014-3 .8%10171018-0.6%101710 1 83 STORYMULTIFAMILY44 UNITSFFE: 1011.00GFE: 1000.33HYDSTORMWATERFILTRATION BASINTOP BERM: 995.00EO: 994.50HWL:994.39BOT:989.00BOT(SAND):985.25WLWLWL DDDPROPOSED PUBLICDRAINAGE, UTILITY ANDROADWAY EASEMENTINSTALL ROCK ENTRANCEPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL BIOROLLSPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL INLET PROTECTIONPER CIVIL DETAILSINSTALL EROSION CONTROLBLANKET PER CIVIL DETAILSDescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\EROSION CONTROL PLANS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC6.1PHASE 2EROSIONCONTROLLEGENDSCALE IN FEET08040EROSION CONTROL NOTES1.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/ORELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ONRECORDS OF THE VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTSTAKEN IN THE FIELD. THE INFORMATION SHALL NOT BE RELIED ON AS BEINGEXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONSPRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OR ENGINEER OFDISCREPANCIES.2.ALL SILT FENCE AND OTHER EROSION CONTROL FEATURES SHALL BE IN-PLACEPRIOR TO ANY EXCAVATION/CONSTRUCTION AND SHALL BE MAINTAINEDUNTIL VIABLE TURF OR GROUNDCOVER HAS BEEN ESTABLISHED. EXISTING SILTFENCE ON-SITE SHALL BE MAINTAINED AND OR REMOVED AND SHALL BECONSIDERED INCIDENTAL TO THE GRADING CONTRACT. IT IS OF EXTREMEIMPORTANCE TO BE AWARE OF CURRENT FIELD CONDITIONS WITH RESPECTTO EROSION CONTROL. TEMPORARY PONDING, DIKES, HAYBALES, ETC.,REQUIRED BY THE CITY SHALL BE INCIDENTAL TO THE GRADING CONTRACT.3.EROSION AND SILTATION CONTROL (ESC): THE CONTRACTOR SHALL ASSUMECOMPLETE RESPONSIBILITY FOR CONTROLLING ALL SILTATION AND EROSIONOF THE PROJECT AREA. THE CONTRACTOR SHALL USE WHATEVER MEANSNECESSARY TO CONTROL THE EROSION AND SILTATION INCLUDING BUT NOTLIMITED TO: CATCH BASIN INSERTS, CONSTRUCTION ENTRANCES, EROSIONCONTROL BLANKET, AND SILT FENCE. ESC SHALL COMMENCE WITH GRADINGAND CONTINUE THROUGHOUT THE PROJECT UNTIL ACCEPTANCE OF THEWORK BYTHE OWNER. THE CONTRACTOR'S RESPONSIBILITY INCLUDES ALLIMPLEMENTATION AS REQUIRED TO PREVENT EROSION AND THE DEPOSITINGOF SILT. THE OWNER MAY DIRECT THE CONTRACTOR'S METHODS AS DEEMEDFIT TO PROTECT PROPERTY AND IMPROVEMENTS. ANY DEPOSITION OF SILT ORMUD ON NEW OR EXISTING PAVEMENT OR IN EXISTING STORM SEWERS ORSWALES SHALL BE REMOVED AFTER EACH RAIN EVENT. AFFECTED AREAS SHALLBE CLEANED TO THE SATISFACTION OF THE OWNER, ALL AT THE EXPENSE OFTHE CONTRACTOR. ALL TEMPORARY EROSION CONTROL SHALL BE REMOVEDBY THE CONTRACTOR AFTER THE TURF IS ESTABLISHED.4.ALL STREETS DISTURBED DURING WORKING HOURS MUST BE CLEANED AT THEEND OF EACH WORKING DAY. A CONSTRUCTION ENTRANCE TO THE SITE MUSTBE PROVIDED ACCORDING TO DETAILS TO REDUCE TRACKING OF DIRT ONTOPUBLIC STREETS.5.PROPOSED PONDS SHALL BE EXCAVATED FIRST AND USED AS TEMPORARYPONDING DURING CONSTRUCTION.6.WHEN INSTALLING END-OF-LINE FLARED END SECTIONS, BRING THE SILT FENCEUP & OVER THE FLARED END SECTIONS & COVER DISTURBED AREAS WITH RIPRAP. THE UPSTREAM FLARED END SECTIONS SHALL HAVE WOOD FIBER BLANKETINSTALLED ON THE DISTURBED SOILS.7.ALL UNPAVED AREAS ALTERED DUE TO CONSTRUCTION ACTIVITIES MUST BERESTORED WITH SEED AND MULCH, SOD, EROSION CONTROL BLANKET OR BEHARD SURFACED WITHIN 2 WEEKS OF COMPLETION OF CONSTRUCTION.8.THE SITE MUST BE STABILIZED PER THE REQUIREMENTS OF THE MPCA, NPDES,MNDOT, AND CITY.A. TEMPORARY (GREATER THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 22-111AT 30.5-POUNDS PER ACRE.B. TEMPORARY (LESS THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 21-112(FALL) OR 21-111 (SPRING/SUMMER) AT 100-POUNDS PER ACREC.INFILTRATION/FILTRATION BASIN SHALL BE MNDOT SEED MIX 34-262 AT14.5-POUNDS PER ACRE.D. POND SLOPES SHALL BE MNDOT SEED MIX 33-261 AT 35-POUNDS PER ACRE.E. GENERAL SEEDING SHALL BE MNDOT SEED MIX 25-151 AT 70-POUNDS PERACRE.F. MULCH SHALL BE MNDOT TYPE 1 APPLIED AT 2-TONS PER ACRE.9.FOR AREAS WITH SLOPES OF 3:1 OR GREATER, RESTORATION WITH SOD OREROSION CONTROL BLANKET IS REQUIRED.10.ALL TEMPORARY STOCKPILES MUST HAVE SILT FENCE INSTALLED AROUNDTHEM TO TRAP SEDIMENT.11.ALL PERMANENT PONDS USED AS TEMPORARY SEDIMENT BASINS DURINGCONSTRUCTION SHALL BE DREDGED AFTER THE SITE HAS BEEN STABILIZED TORESTORE THE POND TO THE PROPOSED BOTTOM ELEVATION.12.ALL CONSTRUCTION SHALL CONFORM TO LOCAL AND STATE RULESINCLUDING THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM(NPDES) PERMIT REQUIREMENTS.13.THE SITE MUST BE KEPT IN A WELL-DRAINED CONDITION AT ALL TIMES. THECONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING, OROTHER MEANS REQUIRED TO INSURE PROPER DRAINAGE DURINGCONSTRUCTION. LOW POINTS IN ROADWAYS OR BUILDING PADS MUST BEPROVIDED WITH A POSITIVE OUTFLOW.PROPERTY BOUNDARYEXISTING CONTOURPROPOSED CONTOURSETBACK LINERIGHT OF WAY LINEEASEMENTSTANDARD CURB AND GUTTERSTORM SEWERFLARED END SECTIONRETAINING WALLDRAINTILEGRADING LIMITSSPOT ELEVATIONFLOW DIRECTIONEMERGENCY OVERFLOWROCK CONSTRUCTION ENTRANCEEROSION CONTROL BLANKETINLET PROTECTIONSILT FENCEBIOROLLLODD-1.50%1000.00E.O. DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\SWPPP NARRATIVE & NOTES.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC7.0SWPPP NARRATIVESWPPP NARRATIVETHE SWPPP IS PREPARED IN ACCORDANCE WITH THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)REGULATIONS AS ESTABLISHED BY THE CLEAN WATER ACT. THE MINNESOTA POLLUTION CONTROL AGENCY'S CONSTRUCTIONGENERAL PERMIT MN R100001 (CSGP) (EXPIRATION DATE JULY 31, 2023) PROVIDES A FRAME WORK OF REQUIREMENTS FORCOMPLIANCE TO DISCHARGE STORMWATER FROM A CONSTRUCTION SITE.THE SWPPP IS FOR IMPLEMENTATION BY THE OWNER AND OPERATOR, AS LISTED BELOW, AT SANTA VERA APARTMENTS. THIS REPORTSHALL BE ON THE SITE AT ALL TIMES DURING CONSTRUCTION. THE OWNER MUST ALSO KEEP THIS SWPPP ON FILE FOR THREE YEARSAFTER SUBMITTAL OF THE NOTICE OF TERMINATION. THE FOLLOWING ARE OUTLINED IN THIS SWPPP:- CONTROL MEASURES FOR STORM WATER POLLUTION PREVENTION PRIOR TO AND DURING CONSTRUCTION- CONTROL MEASURES FOR STORM WATER POLLUTION PREVENTION AFTER CONSTRUCTION- SOURCES OF STORMWATER AND NON-STORMWATER POLLUTION- INSPECTION AND MAINTENANCE PROCEDURESTHE GRADING AND EROSION CONTROL PLAN PREPARED FOR MINNEWASHTA APARTMENTS SHALL BE CONSIDERED PART OF THESWPPP.PROJECT LOCATIONTHIS DOCUMENT PRESENTS A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR MINNEWASHTA APARTMENTS INCHANHASSEN, MINNESOTA. THE SITE IS LOCATED ON 5.60ACRES NEAR THE INTERSECTION OF MN 41 AND MINNETONKA MIDDLESCHOOL-WEST.PROJECT CONTACT INFORMATIONOWNER/DEVELOPER: HEADWATERS DEVELOPMENTOWNER ADDRESS:6757 KARMEN AVENUEALBERTVILLE, MNOWNER EMAIL: RCS@HEADWATERS.BUILDCONTRACTOR: TBDCOMPANY NAME: TBDIDENTIFY PERSONNEL INVOLVED WITH THE PROJECT AND THEIR RELATED NECESSARY TRAINING COMMENSURATE WITH THEIR TASKPRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES.SWPPP DESIGNER: MEASURE GROUP, LLCPETER MOREAUPO BOX 10WAYZATA, MN 55391612-440-0934PMOREAU@MEASUREGRP.COMDESIGN OF CONSTRUCTION SWPPP, U OF M 05/31/28SWPPP INSPECTION:TBDBMP INSTALLER:TBDOWNER/OPERATOR RESPONSIBILITIESOWNER·DEVELOPMENT OF SWPPP PRIOR TO APPLICATION/NOI SUBMITTAL.·SUBMIT A COMPLETE AND ACCURATE APPLICATION FORM (NOI)·COMPLIANCE WITH ALL TERMS AND CONDITIONS OF CONSTRUCTION GENERAL STORMWATER PERMIT·SWPPP SUBMITTAL FOR 30 DAY REVIEW FOR PROTECT GREATER THAN 50 ACRES & DISCHARGING TO SPECIAL/IMPAIREDWATERS WITHIN 1 MILE OF SITE DISCHARGE.·KEEPING PERMIT COVERAGE UP-TO-DATE (TRANSFER/SUBDIVISION)·SUBMIT NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS AFTER ALL PERMIT TERMINATION CONDITIONS AS LISTED IN SECTION13 ARE COMPLETE·SUBMIT NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS OF MEETING REQUIREMENTS OF FINAL STABILIZATION·IDENTIFY WHO HAS LONG TERM OPERATION AND MAINTENANCE RESPONSIBILITY OF THE PERMANENT STORMWATER SYSTEM.·DEVELOP CHAIN OF RESPONSIBILITY WITH ALL OPERATORS TO ENSURE NPDES COMPLIANCE.·IDENTIFY TRAINED PERSONNEL TO DEVELOP THE SWPPP, INSTALL AND MAINTAIN BEST MANAGEMENT PRACTICES, AND OVERSEETHE SWPPP AND CONDUCT INSPECTIONSOPERATOR·COMPLETION OF AN ACCURATE NOI WITH THE OWNER·COMPLIANCE WITH CSGP SECTIONS 3, 4, 6-22, 24 AND ANY APPLICABLE REQUIREMENTS FOR CONSTRUCTION ACTIVITY INSECTION 23 (MINN. R. 7090)·KEEPING THE PERMIT UP-TO-DATE WITH THE OWNER (PARTIAL, WHOLE, CONTRACTOR, BUILDER, ETC)·COMPLETE AND SIGN APPLICATIONS FOR PERMIT TRANSFER AND MODIFICATION AND NOTICE OF TERMINATION WITH OWNERAS NEEDED.PROJECT DESCRIPTIONTHE SITE IS APPROXIMATELY 5.60 ACRES. CONSTRUCTION WILL CONSIST OF, BUT IS NOT LIMITED TO GRADING AND A FILTRATIONBASIN. THE PROPOSED PHASE OF THE DEVELOPMENT WILL CONSIST OF THE CONSTRUCITON OF A MULTIFAMILY HOUSINGDEVELOPMENT WITH ASSOCIATED BUILDING, PARKING LOT AND UTILITY INFRASTRUCTURE.PROJECT AREA = 5.60 ACDISTURBED AREA = 4.54 ACEXISTING IMPERVIOUS AREA = 0.03 ACPROPOSED IMPERVIOUS AREA = 1.15 ACPRE-DEVELOPMENT SITE CONDITIONSSITE IS GENERALLY CONSISTENT WITH TYPE "D" SOILS. THE EXISTING SITE GENERALLY DRAINS FROM NORTHEAST TO THESOUTHWEST.REFER TO GEOTECHNICAL REPORT DATED XX/XX/XXXX COMPLETED BY BRAUN INTERTEC.POST-DEVELOPMENT SITE CONDITIONSTHE PROPOSED SITE MAINTAINS THE OVERALL EXISTING DRAINAGE PATTERNS. MOST OF THE SITE DRAINS FROM NORTHEAST TOSOUTHWEST. THE RUNOFF FROM MOST OF THE SITE WILL BE DIRECTED THROUGH STORM SEWER TO THE FILTRATION BASIN.STORM WATER MANAGEMENT PLAN·THE TEMPORARY STORMWATER MANAGEMENT PLAN WILL CONSIST OF GUIDELINES SET FORTH IN ITEMS 7 AND 8 OF THE SWPPPNOTES SECTION.·THE PERMANENT STORM WATER MANAGEMENT PLAN WILL CONSIST OF SURFACE DRAINAGE BY CURB AND GUTTER, SWALESAND STORM SEWER PIPE.·THE SITE DRAINAGE WILL BE ROUTED TO PROPOSED STORM SEWER WHICH WILL DISCHARGE TO THE FILTRATION BASIN .·REFER TO THE PROJECT STORMWATER MANAGEMENT REPORT FOR MORE INFORMATION REGARDING THE PRE-DEVELOPMENTSITE CONDITIONS, POST-DEVELOPMENT SITE CONDITIONS, AND STORM WATER MANAGEMENT CALCULATIONS.·THE SITE STORM WATER DETENTION FACILITY WILL BE CONSTRUCTED TO MEET OR EXCEED LOCAL, STATE AND FEDERALREQUIREMENTS.·TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMP'S ALONG WITH THE PROCEDURES TO BE USED TOESTABLISHED ADDITIONAL TEMPORARY BMP'S AS NECESSARY FOR SITE CONDITIONS DURING CONSTRUCTION ARE IDENTIFIEDON THE SITE GRADING AND EROSION CONTROL PLAN PREPARED FOR THE DEVELOPMENT OF THIS PROJECT, AND WITHIN THEPROJECT STORM WATER POLLUTION PREVENTION PLAN.POTENTIAL STORM WATER POLLUTANTSPOTENTIAL POLLUTANT SOURCES, INCLUDING CONSTRUCTION AND WASTE MATERIALS THAT ARE USED OR STORED AT THE SITE, AREDESCRIBED IN THE SECTION. BY IMPLEMENTATION OF THESE BMPS, THE POTENTIAL POLLUTANT SOURCES ARE NOT REASONABLYEXPECTED TO AFFECT THE STORM WATER DISCHARGES FROM THE SITE.CONSTRUCTION MATERIALS, CHEMICALS AND WASTE MATERIALS THAT WILL BE USED OR STORED AT THE SITE:CONSTRUCTION SEQUENCETHE INTENDED SEQUENCING OF MAJOR SITE CONSTRUCTION ACTIVITIES IS AS FOLLOWS:1. INSTALL PERIMETER CONTROL DEVICES (SILT FENCE, BIO-LOGS, ETC.) AND INLET PROTECTION TO EXISTING STRUCTURES ASSHOWN ON PLAN.INSTALL TREE PROTECTION FENCE AS SHOWN ON PLAN.2. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE.3. CLEAR AND GRUB SITE.4. STRIP AND STOCKPILE TOPSOIL.5. ROUGH GRADE OF SITE.6. STABILIZE DENUDED AREAS AND STOCKPILES.7. INSTALL SANITARY SEWER, WATERMAIN, STORM SEWER AND SERVICES.8. INSTALL INLET PROTECTION AROUND CATCH BASINS.9. INSTALL STREET SECTION.10. INSTALL CURB AND GUTTER.11. INSTALL PAVEMENT.12. INSTALL SMALL UTILITIES (GAS, ELECTRIC, PHONE, CABLE, ETC.)13. FINE GRADE BOULEVARD, LANDSCAPE AREAS, SEED AND MULCH.14. REMOVE ACCUMULATED SEDIMENT.15. FINAL GRADE.16. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR SOD AND LANDSCAPING,REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL.CONSTRUCTION NOTESIT IS HIGHLY RECOMMENDED THAT THE CONTRACTOR MAINTAIN A STOCKPILE OF EROSION CONTROL DEVICES AND SEDIMENTCONTROL BMP'S ON SITE AT ALL TIMES FOR IMMEDIATE USAGE. IN THE EVENT OF AN ACCIDENTAL SEDIMENT DISCHARGE TOWATERS OF THE STATE, OR ANY DISCHARGE OF HAZARDOUS MATERIAL OF REPORTABLE QUANTITY, CONTACT THE MPCA STATEDUTY OFFICER AT 1-800-422-0798.TIMING OF BMP INSTALLATIONTHE EROSION PREVENTION AND SEDIMENT CONTROL BMP'S SHALL BE INSTALLED TO MINIMIZE EROSION FROM DISTURBED SURFACESAND CAPTURE SEDIMENT ON SITE. THE FOLLOWING LIST DEFINES THE TIMING OF EROSION PREVENTION AND SEDIMENT CONTROLMEASURES IN SPECIFIC AREAS.PRIOR TO START OF CONSTRUCTIONTHE FOLLOWING EROSION PREVENTION AND SEDIMENT CONTROL MEASURES ARE SHOWN IN THE PLANS AND SHALL BE IMPLEMENTEDPRIOR TO CONSTRUCTION:1. INSTALL SILT FENCE OR OTHER SEDIMENT CONTROL AROUND THE PERIMETER OF AREAS TO BE GRADED AND ALL AREAS WHICH ARENOT TO BE DISTURBED AS SHOWN ON THE GRADING AND EROSION CONTROL PLAN.2. CONSTRUCT GRAVEL CONSTRUCTION ENTRANCES AT FIELD ENTRANCES TO THE SITE AS SHOWN ON THE CONSTRUCTION PLANS.3. INLET PROTECTION IS TO BE INSTALLED AT ALL STORM WATER INLETS WHICH HAVE THE POTENTIAL TO RECEIVE STORM WATERRUNOFF FROM THE CONSTRUCTION SITE WITHIN 200 FEET OF LIMITS OF CONSTRUCTION.4. INSTALL SILT FENCE OR OTHER SEDIMENT CONTROL AROUND ALL TEMPORARY INACTIVE STOCKPILES. ALL SILT FENCES FORSTOCKPILES SHALL BE INCIDENTAL TO GRADING CONTRACT IF STOCKPILES ARE PLACED OUTSIDE OF SILT FENCES SHOWN ON THEPLAN.DURING CONSTRUCTIONTHE FOLLOWING EROSION PREVENTION AND SEDIMENT CONTROL MEASURES ARE SHOWN IN THE PLANS AND SHALL BE IMPLEMENTEDDURING CONSTRUCTION:1. PHASE GRADING WORK TO MINIMIZE THE DURATION THAT ANY DISTURBED SOIL IS EXPOSED.2. ALL DISTURBED AREAS SHALL HAVE TEMPORARY PROTECTION OR PERMANENT COVER OVER EXPOSED SOIL AREAS IF NOT BEINGACTIVELY GRADED AND/OR IF NOT AT FINAL GRADE WITHIN 7 DAYS OF DISTURBANCE ACTIVITY TEMPORARILY OR PERMANENTLYCEASING. TEMPORARY SEED MIX 22-111, APPLIED AT A RATE OF 30.5 LBS/ACRE, SHALL BE USED PRIOR TO WINTER, IF SITE NOTSODDED.3. STRIP AND STOCKPILE TOPSOIL FOR REPLACEMENT OF 6 INCHES OF TOPSOIL OVER TURF AREAS WHEN GRADING IS COMPLETE.4. PLACE A MINIMUM OF 2 TONS/ACRE OF STRAW ON ALL AREAS AFTER REACHING FINAL GRADE WITH TOPSOIL AND ANCHORSTRAW WITH EITHER A STRAIGHT DISK, HYDROMULCH OR POLYMER.5. STABILIZATION OF TEMPORARY OR PERMANENT DRAINAGE DITCHES THAT DRAIN WATER FROM THE CONSTRUCTION SITE MUST BEINITIATED WITHIN 24 HOURS OF CONNECTING THE DRAINAGE DITCH TO ANY CONVEYANCE SYSTEM THAT DISCHARGES TOSURFACE WATERS. THE FIRST 200 LINEAR FEET MUST BE STABILIZED WITHIN 24 HOURS. THE REMAINING DITCH SHALL BE STABILIZEDWITHIN 7 DAYS.6. INSTALL SILT FENCE AROUND ALL TEMPORARY INACTIVE STOCKPILES WHICH ARE NOT PLACED WITHIN EXISTING SILT FENCES OROTHER PERIMETER CONTROLS.7. TEMPORARY OR PERMANENT ENERGY DISSIPATION AT PIPE APRON OUTLETS WILL BE PLACED PRIOR TO BUT NO SOONER THAN 7DAYS BEFORE APRON IS INSTALLED. RIPRAP SHALL BE INSTALLED UNDER APRON LIP ACCORDING TO THE STANDARD DETAIL.8. SUFFICIENT PERSONNEL, EQUIPMENT, AND MATERIALS SHALL BE MOBILIZED WITHIN 24 HOURS OF A WRITTEN ORDER BY THEOWNER OR OWNER'S REPRESENTATIVE TO CONDUCT CORRECTIVE WORK AND INSTALL TEMPORARY EROSION CONTROL WORK INTHE CASE OF AN EMERGENCY.9. REMOVE ANY SEDIMENT THAT HAS BEEN TRACKED ONTO PUBLIC STREETS AT THE END OF THE DAY OR WITHIN 24 HOURS OFDETECTION, OR MORE FREQUENT AT DIRECTION OF SITE INSPECTOR.10. COLLECT ALL CONSTRUCTION DEBRIS IN DUMPSTERS AND ROLL-OFF BOXES, EMPTY WHEN DEBRIS REACHES TOP OF DUMPSTER11. INSPECT POLLUTION CONTROL MEASURES AS SPECIFIED WITHIN SECTION 11 OF THE GENERAL PERMIT.INLET SEDIMENT CONTROL BMP REMOVALIF INLET SEDIMENT CONTROLS (WIMCO TYPE OR EQUAL) BMP'S ARE REMOVED FOR FLOODING / FREEZING CONCERNS UPONREQUEST OF THE MUNICIPALITY, WATERSHED DISTRICT OR OTHER AGENCY, DOCUMENTATION SHALL BE ATTACHED TO THEINSPECTION REPORTS AND THIS SWPPP OR BEAVAILABLE WITHIN 72 HOURS OF REQUEST. DOCUMENTATION SHALL BE A WRITTEN FORM OF CORRESPONDENCE VERIFYING THENEED FOR REMOVAL.UPON COMPLETION OF CONSTRUCTION ACTIVITIESPERMIT TERMINATION CONDITIONS ARE ACHIEVED FOR THE PROJECT WHEN PERMANENT EROSION CONTROL BMP'S ARE APPLIED TOTHE SITE. THE PERMANENT EROSION CONTROL BMP'S MAY BE A COMBINED OF VEGETATIVE AND NON-VEGETATIVE COVER TYPES.ADDITIONAL REQUIREMENTS TO ACHIEVING FINAL STABILIZATION PERMIT TERMINATION CONDITIONS INCLUDE:1. ALL SOIL DISTURBING ACTIVITY IS COMPLETED. ALL DISTURBED AREA WITHOUT PERMANENT IMPERMEABLE SURFACES AREVEGETATED FOR FINAL STABILIZATION.2. PERMANENT STORMWATER TREATMENT SYSTEM (IF REQUIRED) IS CONSTRUCTED AND ACCUMULATED SEDIMENT HAS BEENREMOVED FROM CONSTRUCTION ACTIVITY. CLEAN OUT ALL SEDIMENT FROM CONVEYANCES AND FROM TEMPORARY SEDIMENTBASINS THAT ARE TO BE USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS. THE CLEAN OUT OF PERMANENT BASINS MUSTBE SUFFICIENT TO RETURN THE BASIN TO DESIGN CAPACITY.3. THE VEGETATIVE COVER FOR THE SITE IS AT A DENSITY, WITH UNIFORM PERENNIAL COVER OF 70% OF THE EXPECTED FINALGROWTH DENSITY.4. ALL TEMPORARY, SYNTHETIC BMP'S HAVE BEEN REMOVED.PERMANENT VEGETATION ESTABLISHMENTPERMANENT TURF SHALL FOLLOW THE RECOMMENDATIONS PER NOTES AND SPECIFICATIONS IN THE GRADING AND/OR LANDSCAPEPLAN. SEED THAT IS TO OCCUR AFTER OCTOBER 20TH SHALL CONFORM TO THE MNDOT SPECIFICATIONS FOR DORMANT SEEDING.SWPPP INSPECTIONS AND MAINTENANCE EROSION AND SEDIMENT CONTROL INSPECTIONSCONSTRUCTION ACTIVITY AND ALL SUPPORT ACTIVITIES MUST BE INSPECTED (USING MPCA CONSTRUCTION STORMWATERINSPECTION CHECKLIST OR AN ALTERNATIVE FORM) WITHIN THE PARAMETERS OF THE SCHEDULE BELOW. THE INSPECTOR SHALL BEA PERSON TRAINED AND FAMILIAR WITH THE REQUIREMENTS OF THIS SWPPP AND THE MPCA MN R100001 PERMIT. ALTERNATES WILLINCLUDE INDIVIDUALS TO BE DESIGNATED BY THE OWNER AND MAY INCLUDE CONTRACTOR PERSONNEL OR OTHER QUALIFIEDINDIVIDUALS AND SHALL BE LISTED IN THE PROJECT CONTACT INFORMATION SECTION OF THIS PLANINSPECTION SCHEDULE:- IF THE SITE IS ACTIVE: INSPECTION NEEDED ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL GREATER THAT0.5 INCHES.- INACTIVE AND STABILIZED AREAS: INSPECTION NEEDED ONCE EVERY 30 CALENDAR DAYS.- INACTIVE AREAS WITH FINAL STABILIZATION: INSPECTION NEEDED ONCE EVERY MONTH FOR 12 MONTHS (NOT INCLUDING FROZENCONDITIONS).- SUBJECT TO WINTER/FROZEN CONDITIONS: NOT APPLICABLE/NOT NEEDED IF NO CONSTRUCTION ACTIVITY IS OCCURRING.SCOPE OF INSPECTION SHALL INCLUDE:1. RECORD DATE AND TIME OF INSPECTION2. NAME OF PERSON(S) CONDUCTING INSPECTION3. FINDINGS OF THE INSPECTION4. LOCATION AND CORRECTIVE ACTIONS NEEDED5. CORRECTIVE ACTIONS TAKEN (DATE.TIME/BY WHOM)6. DATE AND AMOUNT OF RAINFALL (RAINFALL AMOUNTS TO BE TAKEN FROM AN ONSITE RAIN GAUGE)7. OBSERVED DISCHARGES LOCATIONS8. DESCRIBE DISCHARGE (COLOR, ODOR, FLOATING. SETTLED, SOLIDS, FOAM, OIL SHEEN)9. THE SITE INSPECTOR WILL VISUALLY CHECK A DISCHARGE FROM A TEMPORARY OR PERMANENT SEDIMENTATION BASIN TO ENSUREADEQUATE TREATMENT IS OBTAINED AND DISCHARGE WATER WILL NOT CONTRIBUTE EXCESSIVE SEDIMENT OR OTHER NUISANCECONDITIONS.10. RECORD CHANGES MADE TO THE SWPPP. AMENDMENTS FROM INSPECTIONS NEED TO BE COMPLETED WITHIN 7 DAYS.11. ALL INSPECTIONS SHALL BE DOCUMENTED WITHIN 24 HOURS AFTER COMPLETING THE FIELD INSPECTION AND AVAILABLE IN PAPEROR ELECTRONIC FORM ON SITE.MAINTENANCE OF EROSION AND SEDIMENT CONTROL DEVICESTHE OWNER/CONTRACTOR IS RESPONSIBLE FOR THE OPERATION, MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITYMANAGEMENT BMPS AS WELL AS ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS, FOR THE DURATION OF THECONSTRUCTION WORK AT THE SITE. THE CONTRACTOR MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPSAND POLLUTION PREVENTION MANAGEMENT MEASURES TO ENSURE INTEGRITY AND EFFECTIVENESS DURING ALL ROUTINE AND POSTRAINFALL EVENTS. ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WITH FUNCTIONAL BMPS BY THEEND OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS UNLESS ANOTHER TIMEFRAME IS SPECIFIED BELOW.THE FOLLOWING GUIDELINES WILL BE USED TO DETERMINE IF THE EROSION AND SEDIMENT CONTROL DEVICES REQUIREMAINTENANCE, REPAIR, OR REPLACEMENT:1. ALL NON-FUNCTIONAL BMPS - OBSERVED CONDITION; SEDIMENT OVERTOPPING, UNDER WATER, SCOURED ENDS, UNDERMINED,DESTROYED, NON-FUNCTION AS DESIGNED, ETC. - SHALL BE MAINTAINED OR REPLACED BY THE END OF THE NEXT BUSINESS DAYAFTER DISCOVERY OR NOTIFICATION, OR AS SOON AS FIELD CONDITIONS ALLOW.2. PERIMETER SEDIMENT CONTROL (SILT FENCE, FIBER LOGS, BERMS, ETC.) - OBSERVED CONDITION TO BE 1/2 FULL OF SEDIMENT,FLATTENED TO 12 HEIGHT, DRIVEN OVER, UNDERMINED, SCOURED, MOVED FOR ACCESS, ETC. - SHALL BE MAINTAINED, REPAIRED ORSUPPLEMENTATION OF PERIMETER SEDIMENT CONTROL SHOULD BE DONE BY THE END OF NEXT BUSINESS DAY OR AD FIELDCONDITIONS ALLOW.3. INLET PROTECTION BMPS, CONVEYANCES, SURFACE WATERS - OBSERVED CONDITION; SEDIMENT DEPOSITION, SEDIMENT DELTASAN ACCUMULATION OF SEDIMENT MATERIAL, DEVICES APPEAR PLUGGED WITH SEDIMENT - REMOVAL/CLEAN OUT OFACCUMULATED SEDIMENT AND DELTAS TO BE REMOVED WITHIN 7 DAYS, STABILIZE AS NEEDED IF SOILS ARE EXPOSED DURINGREMOVAL/CLEAN OUT.4. TEMPORARY SEDIMENT BASINS AND TRAPS/PERMANENT SEDIMENT BASINS - OBSERVED TO HAVE SEDIMENT DEPOSITION ANDACCUMULATION TO 1/2 OF THE STORAGE VOLUME - CLEAN OUT, REMOVE ACCUMULATED SEDIMENT MATERIAL WITHIN 7 DAYS OFOBSERVATION, OR AS FIELD CONDITIONS ALLOW ACCESS.5. SITE EXIT LOCATIONS, ROCK EXIT PADS, OTHER ANTI-TRACKING PRACTICES - OBSERVED TO HAVE ACCUMULATED SEDIMENT INROCK OR OTHER ANTI-TRACKING BMP, TRACKING OF SEDIMENT FROM THE SITE ONTO PAVED SURFACES - TOP DRESS ROCK,MAINTAIN ROCK EXIT OR OTHER ANTI-TRACKING CONTROLS, SCRAP PAVED SURFACES, SWEEP PAVED SURFACES WITHIN 1CALENDAR DAY OF DISCOVERY.6. PAVED SURFACES AND ADJACENT STREETS - OBSERVED TO BE TRACKED WITH SEDIMENT AND SOIL MATERIAL FRO THE SITEHAULING OR ACCESS -SWEEP WITHIN 1 CALENDAR DAY OF DISCOVERY, ADDITIONAL AND/OR MORE FREQUENT SWEEPING MAY BENEEDED TO MAINTAIN PUBLIC SAFETYOR PREVENT WASHING FROM FORECASTED RAINS.7. STREET SWEEPING IS REQUIRED ONE TIME PER WEEK AND AFTER RAINFALL OR MORE FREQUENTLY IF DIRECTED BY CITY ENGINEER.TERMINATION OF COVERAGETHE PROJECT PERMIT MAY BE TERMINATED IN ONE OF THE FOLLOWING SCENARIOS:1. ALL CONSTRUCTION ACTIVITY IS COMPLETE, TEMPORARY SYNTHETIC BMP'S ARE REMOVED, ACCUMULATED SEDIMENT FROMCONSTRUCTION IS REMOVED, AND PERMANENT COVER HAS BEEN ACHIEVED WITH VEGETATIVE AND/OR NON-VEGETATIVE COVER.THE NOTICE OF TERMINATION FORM FROM THE PCA SHOULD BE COMPLETED WITHIN 30 DAYS OF MEETING THE CONDITIONS ABOVE.UPON MIDNIGHT OF THE POST MARKED DATE, THE PERMIT COVERAGE IS TERMINATED UNLESS OTHERWISE NOTIFIED BY THE MPCA.OR:2. WITHIN 30 DAYS OF SELLING OR OTHERWISE LEGALLY TRANSFERRING OWNERSHIP OF THE SITE IN IT'S ENTIRETY (INCLUDING STREETSWEEPING AND STORMWATER INFRASTRUCTURE) FROM THE ORIGINAL OWNER TO ANOTHER PARTY TAKING RESPONSIBILITY OFOWNERSHIP. THE TERMINATION IS EFFECTIVE UPON MIDNIGHT OF THE SUBMISSION DATE OF THE NOT. IF A PORTION OF THE SITE ISTRANSFERRED (I.E. OUTLOTS,LOTS/BLOCKS) THAT PORTION OF THE SITE IS TERMINATED FROM THE ORIGINAL PERMIT COVERAGE ATMIDNIGHT OF THE SUBMISSION DATE. OR:3. PERMIT COVERAGE CAN BE TERMINATED IF ALL OF THE FOLLOWING ARE MET:3.a. CONSTRUCTION ACTIVITY HAS CEASED FOR 90 DAYS; AND3.b. AT LEAST 90% OF THE AREA OF THE ORIGINALLY PROPOSED ACTIVITY HAS BEEN COMPLETED AND PERMANENTLY ESTABLISHEDWITH VEGETATION OR NON-VEGETATIVE COVER; AND3.c. WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE, PERMANENT COVER HAS BEEN ESTABLISHED; AND3.d. THE SITE IS COMPLIANT WITH PERMIT SECTIONS 13.3 THROUGH 13.7.4. WHERE THE PROJECT OBTAINED PERMIT COVERAGE BUT NEVER STARTED CONSTRUCTION ACTIVITY DUE TO CANCELLATION OROTHER REASONS, DOCUMENTATION SHOULD BE SENT TO THE MPCA WITH THE NOT FORM AND IS SUBJECT TO MPCA APPROVAL.POTENTIAL POLLUTANTLOCATIONCONTROL MEASUREANTIFREEZEVARIOUSSECONDARY CONTAINMENT/DRIP PANDIESEL FUELVARIOUSSECONDARY CONTAINMENT/DRIP PANFERTILIZERLANDSCAPE CONTRACTORSECONDARY CONTAINMENTGASOLINEIN EQUIPMENT/FUELING AREASECONDARY CONTAINMENT/DRIP PANGLUE/ADHESIVESCONTRACTORSECONDARY CONTAINMENTHYDRAULIC OILCONTRACTORSECONDARY CONTAINMENTPAINTSCONTRACTORSECONDARY CONTAINMENTGREASECONTRACTORSECONDARY CONTAINMENT/DRIP PANSANITARY WASTEPORTABLE BATHROOMSSERVICE PROVIDER TO SECURE UNITS FROM TIPPINGSOIL AMENDMENTSLANDSCAPE CONTRACTORSECONDARY CONTAINMENTCONCRETETRUCK WASHOUTWASHOUT AREACONCRETE/MORTARMOBILE MIXERS.C / WASHOUT AREASWPPP BMP QUANTITIESSILT FENCE 1,721 LFBIO-ROLL 60 LFINLET PROTECTION 6 EACHCULVERT/ FES PROTECTION 3 EACHTEMPORARY SEED MIX (22-111) AS NEEDEDPERMANENT SEED MIX 81,067 SFSOD 18,473 SFEROSION CONTROL BLANKET 4,021 SFROCK CONSTRUCTION ENTRANCE 1 EACHSTREET SWEEPING1 EACH DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\SWPPP NARRATIVE & NOTES.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC7.1SWPPP NOTESLISTED BELOW ARE ADDITIONAL BMP'S THAT MAY BE CONSIDERED FOR USE IF THE BMP'S IDENTIFIED IN THEEROSION CONTROL PLANS PROVE TO BE INSUFFICIENT. PAYMENT FOR THESE BMP'S MAY ONLY BE MADE IFPRIOR APPROVAL FROMAN OWNER HAS BEEN GIVEN.1.IMPORTANT VEGETATION·SAFETY FENCE OR A SIMILAR METHOD OF PROTECTION SHALL BE INSTALLED TO PROTECT IMPORTANTVEGETATION AND PROHIBIT VEHICULAR TRAFFIC.·A SECONDARY SILT FENCE SHALL BE INSTALLED AT FIELD OFFICES, STORED EQUIPMENT (INCLUDINGVEHICLE PARKING), CONSTRUCTION MATERIAL LOCATIONS, AND TOPSOIL OR FILL STOCKPILESINSTALLED WITHIN A 25-FOOT MINIMUM BUFFER OUTSIDE THE DRIP LINE OF TREES.2.DITCH PROTECTION (TEMPORARY OR PERMANENT)·THE LAST 200 FEET OF ANY DITCH CONNECTING TO A SURFACE WATER SHALL HAVE TEMPORARY ORPERMANENT STABILIZATION MEASURES IN PLACE WITHIN 24 HOURS OF DIRECT CONNECTION TO ASURFACE WATER. DITCHES MAY BE KEPT IN A "SMOOTH" ROUGH GRADED CONDITION IN ORDER TOPROPERLY INSTALL EROSION CONTROL SEEDING, MULCH, MATS AND BLANKETS.·STABILIZATION METHODS FOR DITCH BOTTOM WETTED PERIMETER MAY INCLUDE ONE OF THEFOLLOWING OR COMBINATIONS OF EROSION CONTROL BLANKET, MATS, RIP-RAP, BIO-ROLLS OR ROCKCHECK DAMS. THE METHOD CHOSEN WILL BE BASED ON AN ANALYSIS OF THE SLOPE AND VELOCITYOF THE RUNOFF. THESE ARE ADDITIONAL BMP'S WHICH MAY BE CONSIDERED FOR USE IF THE BMP'SIDENTIFIED IN THE EROSION CONTROL PLANS PROVE TO BE INSUFFICIENT. PAYMENT FOR THESE BMP'SMAY ONLY BE MADE IF PRIOR APPROVAL FROM AN OWNER HAS BEEN GIVEN.·WHERE DITCH GRADES EXCEED 5%, ROCK CHECK DAMS OR EQUIVALENT BMP SHALL BE INSTALLED.CHECK DAMS TO BE SPACED SO THAT THE CREST OF THE DOWNSTREAM DAM IS AT THE ELEVATION OFTHE TOE OF THE UPSTREAM DAM. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TOCONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THEGRADING CONTRACT.·ABOVE THE WETTED PERIMETER, THE DITCH WILL BE STABILIZED BY SEEDING AND MULCH AND/OREROSION CONTROL BLANKETS DEPENDING ON SIDE SLOPE STEEPNESS AND LENGTH.·ALL DITCHES WILL BE STABILIZED WITHIN 14 DAYS.3. WORK NEXT TO WETLANDS·PRESERVE A 100' FROM SPECIAL WATERS) NATURAL BUFFER, OR IF A BUFFER IS INFEASIBLE, PROVIDEREDUNDANT SEDIMENT CONTROLS PRIOR TO DISTURBANCE OF UP-GRADIENT AREAS.·FILL SLOPES ADJACENT TO WETLANDS SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS OFCOMPLETION OF WORK. INSTALL EROSION CONTROL BLANKET AS INDICATED ON THE EROSIONCONTROL / GRADING PLAN.4. LONG-STEEP CUT/FILL SLOPES·THERE WILL BE NO UNBROKEN SURFACE SLOPE LENGTHS OF GREATER THAN 75 FEET FOR SLOPES WITHA GRADE OF 3:1 OR STEEPER WITHIN 200 FEET OF SURFACE WATERS. ALL EXPOSED AREAS WITH ACONTINUOUS POSITIVE SLOPE WITHIN 200 FEET OF A SURFACE WATER WILL HAVE A TEMPORARY ORPERMANENT COVER YEAR ROUND. THE EXPOSED SOILS SHALL BE STABILIZED WITHIN 14 DAYS·PLANNED SLOPES OF 3:1 (H:V) OR STEEPER AND GREATER THAN 75 FT IN LENGTH WILL BE TEMPORARILYOR PERMANENTLY STABILIZED IN INCREMENTS NOT TO EXCEED 75 FT, PRIOR TO CONSTRUCTION ORDISTURBING A NEW INCREMENT.·LONG SLOPES SHOULD BE BROKEN INTO SHORTER LENGTHS BY INSTALLING STRAW BIOROLLS ININTERLOCKING HERRINGBONES AS SHOWN ON THE GRADING PLAN. IF TEMPORARY SEEDING ANDMULCH CAN NOT BE USED ON SLOPES STEEPER THAN 3:1, THEN THE SLOPE MAY BE COVERED WITHTARPS OR PLASTIC SHEETING. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TOCONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THEGRADING CONTRACT.·THE SOIL SURFACE ON RE-VEGETATED SLOPES WILL BE ROUGHENED USING ANY APPROPRIATEIMPLEMENT THAT CAN BE SAFELY OPERATED ON THE SLOPE, SUCH AS BULLDOZERS OR DISKS. THEGROOVES SHALL BE CREATED PERPENDICULAR TO THE SLOPE TO HELP ESTABLISH VEGETATIVE COVER,REDUCE RUNOFF VELOCITY, INCREASE INFILTRATION, AND PROVIDE FOR SEDIMENT TRAPPING.5.CULVERT INLET/OUTLET PROTECTION·SOD MAY BE PLACED AND ANCHORED AT CULVERT INLETS AS SHOWN ON THE GRADING PLAN, UNLESSVELOCITIES REQUIRE RIPRAP.·AT LEAST ONE 2-FOOT WIDE STRIP OF SOD OR FIBER BLANKET SHALL BE PLACED ALONG THE EDGES OFCULVERT HEADWALLS AND WINGWALLS AS SHOWN ON THE GRADING AND/OR UTILITY PLANS.·RIPRAP AT PIPE APRON OUTLETS WILL BE PLACED PRIOR TO BUT NO SOONER THAN 7 DAYS BEFOREAPRON IS INSTALLED. RIPRAP SHALL BE INSTALLED UNDER APRON LIP ACCORDING TO THE STANDARDDETAIL.6.STORM SEWER INLET PROTECTION·STORM DRAIN INLETS SHALL BE PROTECTED UNTIL THE DISTURBED AREAS THAT COULD DISCHARGE TOAN INLET HAVE BEEN STABILIZED.·INFRASAFE SEDIMENT CONTROL BARRIERS OR APPROVED EQUAL SHALL BE USED WHEN CASTINGS ARENOT IN PLACE AS INDICATED ON THE UTILITY PLAN AND AS APPROVED BY THE OWNER.·INFRASAFE DEBRIS COLLECTION DEVICE OR APPROVED EQUIVALENT SHALL BE USED WHEN CASTINGSARE IN PLACE AS INDICATED ON THE UTILITY PLAN AND AS APPROVED BY THE OWNER.·DOCUMENTATION IS NEEDED WITHIN 72 HOURS IF REMOVAL OF PROTECTION BMPS IS NEEDED DUE TOWINTER CONDITIONS OR FLOODING CONCERNS.7.STORM WATER POND OUTLETS·TEMPORARY OR PERMANENT ENERGY DISSIPATION MEASURES SHALL BE IN PLACE AT THE STORMWATER POND OUTLETS WITHIN 24 HOURS OF DIRECT CONNECTION TO A SURFACE WATER.·RIPRAP AT PIPE APRON OUTLETS WILL BE PLACED PRIOR TO APRON INSTALLATION AND SHALL BEINSTALLED UNDER THE APRON LIP.·POND EMERGENCY SPILLWAYS SHALL BE LINED BASED ON THE DESIGN DISCHARGE FLOW VELOCITYAND AS INDICATED ON GRADING AND/OR UTILITY PLANS.8.TEMPORARY SEDIMENT BASINS·TEMPORARY SEDIMENT BASINS WILL BE PROVIDED WHERE 10 OR MORE ACRES OF DISTURBED SOILDRAIN TO ACOMMON LOCATION. THE BASIN SIZE IS BASED ON RUNOFF FROM A 2-YEAR, 24 HOURSTORM, FOR EACH ACRE DRAINED TO THE BASIN. AT A MINIMUM, THE BASIN WILL PROVIDE 1800 CUBICFEET OF STORAGE FOR EACH ACRE DRAINED TO THE BASIN.·SEDIMENT BASINS WILL DETAIN WATER LONG ENOUGH TO SETTLE OUT AT LEAST 75 PERCENT OF THESEDIMENT. THE USE OF FLOCS MAY BE NECESSARY. THE DISCHARGE QUALITY SHALL BE EQUAL TO ORBETTER THAN THE RECEIVING WATER. THE TEMPORARY BASIN MAY BE DRAWN DOWN WITH A PUMP TOINCREASE CAPACITY FOR THE NEXT RAIN EVENT. TEMPORARY EROSION CONTROL DEVICES REQUIREDDUE TO CONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTALTO THE GRADING CONTRACT.·THE SEDIMENT PONDS WILL BE EXCAVATED TO MAINTAIN THE NECESSARY SEDIMENT CAPACITY ANDCONTAINMENT.··TEMPORARY SEDIMENT FOREBAYS WILL BE CONSTRUCTED TO CAPTURE SEDIMENT BEFORE IT ENTERSTHE POND, IF·NECESSARY.·THE SEDIMENT PONDS WILL BE MONITORED BY THE CONTRACTOR TO DETERMINE THE SEDIMENT LEVELIN THE POND.·WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE TEMPORARY BASIN REACHES ½ FULL (50% OF THESTORAGE VOLUME) THE BASIN SHALL BE DRAINED USING PUMPS AND ENERGY DISSIPATION ANDSEDIMENT REMOVAL SHALL BE COMPLETED WITHIN 72 HOURS OF DISCOVERY OF THE BASIN BEING 1/2FULL OF SEDIMENT, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. TEMPORARY EROSIONCONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIRCONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·TEMPORARY SEDIMENT BASINS WILL HAVE A STABILIZED EMERGENCY OVERFLOW AND CONTAINENERGY DISSIPATION AT BASIN OUTLET.9.DEEP UTILITIES: WATER AND SANITARY/GAS LINE·SILT FENCE OR A SIMILAR TYPE OF PERIMETER CONTROL SHALL BE PLACED DOWN GRADIENT OF THEEXCAVATED SOIL IF WORK IS DONE WITHIN 200 FEET OF WETLANDS OR STREAMS.·DISTURBANCE OF CHANNEL BANKS, WETLANDS, AND IMPORTANT VEGETATION AREAS SHALL BEMINIMIZED TO THE EXTENT POSSIBLE.·THE UTILITY CONSTRUCTION SITE SHALL BE SEEDED WITH A TEMPORARY·SEED MIX AND MULCH AFTER INSTALLATION IF THE SITE WILL BE IDLE FOR 7, 14, OR 21 DAYS DEPENDINGUPON SLOPES OF STEEPER THAN 3:1, 3:1 TO 10:1 AND FLATTER THAN 10:1 RESPECTIVELY.10.STOCKPILES (TEMPORARY AND PERMANENT)·LOCATE STOCKPILES A MINIMUM OF 100 FEET FROM CATCH BASIN INLETS, PONDS, AND SITE DRAINAGEROUTES PERIMETER CONTROLS SUCH AS SILT FENCE SHALL BE INSTALLED AROUND ALL STOCKPILES IFNOT PLACED WITHIN EXISTING SILT FENCES OR OTHER SEDIMENT CONTROL.·TEMPORARY SEED AND MULCH SHALL BE USED TO STABILIZE THE STOCKPILES AND THE STOCKPILESSHALL BE SHAPED TO FACILITATE SEEDING AND MINIMIZE EROSION AND SHALL BE SEEDED WITHIN 7DAYS. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OFSEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT.·IF TEMPORARY SEED AND MULCH CANNOT BE USED, THEN THE STOCKPILES SHALL BE COVERED WITHHYDROMULCH, TARPS OR PLASTIC SHEETING AS APPROVED BY THE OWNER.·IF STOCKPILES MUST BE PLACED WITHIN A CONVEYANCE A TEMPORARY BYPASS SHALL BE INSTALLED(I.E. PVC PIPE) TO ADEQUATELY CONVEY RUNOFF. TEMPORARY BYPASS BMPS SHALL BE INCIDENTAL TOTHE CONTRACT UNLESS PREVIOUSLY APPROVED BY THE OWNER / ENGINEER11.CONSTRUCTION DEWATERING·DURING DEWATERING ACTIVITIES, THE SEDIMENT LADEN WATER CANNOT BE DIRECTLY DISCHARGED TOSURFACE WATERS. OPTIONS FOR REDUCING THE TURBIDITY OF THE WATER INCLUDE:(TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD OFSEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING CONTRACT):1.CONSTRUCT A TEMPORARY SEDIMENT TRAP FOR TURBID WATER DISCHARGE.2.USE A PORTABLE SEDIMENT TRAP SYSTEM.3.APPLY NATURAL BASED FLOCCULENT TECHNOLOGY SUCH AS CHITOSAN IN SEDIMENT TRAPS OR ASERIES OF DITCH CHECKS TO CONTAIN SEDIMENT.4.DISCHARGE THROUGH FIBERLOGS OR A ROCK WEEPER INTO A LARGE VEGETATIVE BUFFER AREA.5.PUMP TO A TEMPORARY SEDIMENT BASIN.6.ENERGY DISSIPATION WILL BE PROVIDED AT ALL DISCHARGE POINTS.7.DEWATERING OR BASIN DRAINING ACTIVITIES WILL NOT CAUSE EROSION IN RECEIVING CHANNELS ORADVERSELY IMPACT WETLANDS.8.ALL EROSION CONTROL OR SEDIMENT TRAPS REQUIRED FOR CONSTRUCTION DEWATERING SHALL BECONSIDERED INCIDENTAL TO THE CONSTRUCTION ACTIVITY REQUIRING DEWATERING.12.CONSTRUCTION ENTRANCES·A TEMPORARY CRUSHED ROCK OR WOOD CHIP PAD SHALL BE LOCATED WHERE VEHICLES LEAVE THECONSTRUCTION SITE.·THE CONSTRUCTION ENTRANCE PAD SHALL BE AT LEAST 50 FEET IN LENGTH.·GEOTEXTILE FABRIC MAY BE PLACED UNDER THE CRUSHED ROCK OR WOOD CHIPS TO PREVENTMIGRATION OF MUD FROM UNDERLYING SOIL INTO THE CONSTRUCTION ENTRANCE MATERIAL.·ROCK PADS SHALL BE CONSTRUCTED OF ROCK 1 TO 3 INCHES IN SIZE AND PLACED IN 6 INCH LAYERS.·CONSTRUCTION ENTRANCES SHALL BE INSPECTED AT LEAST EVERY 7 DAYS AND MAINTAINED ASNEEDED.·TRACKED SEDIMENTS SHALL BE REMOVED FROM PAVED SURFACES AT THE END OF EACH DAY USINGPICK-UP TYPE STREET SWEEPER.·IF TRACKING INTO ROADWAY BECOMES PROBLEMATIC THE ENTRANCE PADS SHALL BE LENGTHENED ORANOTHER TECHNIQUE APPLIED. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TOCONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THEGRADING CONTRACT.·THE CONSTRUCTION ENTRANCE SHALL BE MONITORED CLOSELY DURING WET CONDITIONS. IFTRACKING INTO ADJACENT ROADWAYS OCCURS, THE FREQUENCY OF STREET SWEEPING SHALL BEINCREASED.13.CONCRETE TRUCK WASHOUT·CONCRETE TRUCKS SHALL UTILIZE THE CONCRETE WASHOUT AREA SHOWN ON THE PLANS TO WASHAND RINSE THEIR EQUIPMENT PRIOR TO LEAVING THE SITE.·WASHOUT OF CONCRETE MIXER TRUCKS WILL BE PERFORMED IN THE DESIGNATED AREAS ONLY.·WASHOUTS WILL BE CONSTRUCTED AND MAINTAINED TO PROVIDE SUFFICIENT CONTAINMENT FOR ALLLIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS.·WASHOUTS SHALL BE CLEARLY MARKED ON SITE WITH SIGNAGE BY THE UTILITY CONTRACTOR WITHAPPROVAL FROM OWNER.·WASHOUTS SHALL BE LOCATED A MINIMUM OF 50 FEET FROM DRAINAGE FACILITIES ANDWATERCOURSES.·CONCRETE WASHOUT AREAS WILL HAVE AN IMPERMEABLE LINER TO PREVENT CONCRETE WASHOUTWATER FROM INFILTRATING/CONTACTING WITH SOIL.·IMPERMEABLE LINER INCLUDES 10 MIL POLYLINER OR COMPACTED CLAY LINER.·WASHOUT SYSTEMS CAN BE USED AS ALTERNATE WASHOUT AREAS.14.VEHICLE MAINTENANCE·ROUTINE MAINTENANCE OF VEHICLES AND EQUIPMENT SHALL OCCUR IN STAGING AREAS ONLY.·VEHICLE WASHING SHOULD BE AVOIDED. IF WASHING IS NECESSARY, RUNOFF FROM THE WASHINGWILL BE CONTAINED AND LIMITED TO A DEFINED AREA OF THE SITE. RUNOFF MUST BE CONTAINED ANDWASTE PROPERLY DISPOSED OF·ENGINE DEGREASING SHALL BE AVOIDED. IF DEGREASING IS NECESSARY, RUNOFF FROM THEOPERATION WILL BE CONTAINED IN A LINED SEDIMENT TRAP AND PROPERLY DISPOSED OF AT ATREATMENT FACILITY.·ALL REQUIRED SEDIMENT TRAPS AND CONTAINMENT FACILITIES AND PROPER DISPOSAL OF WASHWATER/DEGREASING AT A TREATMENT FACILITY SHALL BE INCIDENTAL TO THE CONSTRUCTIONCONTRACT.15.FUELING·ANY FUEL TANK OR TRUCK STORED ON THE PROJECT SITE SHALL BE PROTECTED BY A SECONDARYCONTAINMENT SYSTEM.·FUELING AREAS SHALL NOT BE WASHED OR RINSED WITH WATER SINCE THIS COULD CAUSE FUEL SPILLSTO BE DISCHARGED INTO STORM WATER SYSTEMS.·ABSORBENT MATERIALS SHALL BE AVAILABLE ON SITE FOR USE IN CLEANING UP SMALL SPILLS.·ALL REQUIRED FUEL CONTAINMENT AND CLEAN-UP MATERIALS AND THE PROPER DISPOSAL OF THEMATERIALS SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT.16.HAZARDOUS MATERIALS·HAZARDOUS MATERIALS SHALL BE PROPERLY STORED TO PREVENT VANDALISM OR UNAUTHORIZEDACCESS.·CONTAINMENT UNITS SHALL BE INSTALLED IN ACCORDANCE WITH FEDERAL, STATE, AND LOCALREGULATIONS.·MPCA STORING AND DISPOSAL REQUIREMENTS SHALL BE FOLLOWED FOR ALL HAZARDOUS WASTE.·NO HAZARDOUS MATERIAL SHOULD BE STORED WITHIN 200 FEET OF AN IDENTIFIED CRITICAL AREA.·ABSORBENT MATERIALS SHALL BE AVAILABLE FROM THE CONTRACTOR ON SITE FOR USE IN CLEANINGUP SMALL SPILLS.·IF BUILDING MATERIALS, CHEMICALS, OR GENERAL REFUSE IS BEING USED, STORED, DISPOSED OF, OROTHERWISE MANAGED INAPPROPRIATELY, THE CONTRACTOR SHALL CORRECT SUCH DEFECTS WITHIN24 HOURS OF DETECTION OR NOTIFICATION.·ALL REQUIRED CONTAINMENT / STORAGE UNITS / ABSORBENT MATERIAL AND REQUIRED DISPOSALSHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT.17.CHEMICAL CONTAINMENT·GASOLINE, OIL, PAINT, SOLVENTS, AND OTHER CHEMICALS NECESSARY FOR CONSTRUCTION ARE NOTALLOWED TO CONTACT THE GROUND SURFACE, BE EXPOSED TO GROUNDWATER OR BE RELEASED TOA SURFACE OR GROUNDWATER EXCEPT IN DE MINIMIS QUANTITIES.·ALL PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINER, WITH ORIGINAL LABELS STILL ATTACHED,UNLESS THE CONTAINER IS NOT RESEALABLE.·HAZARDOUS MATERIALS SHALL BE RETURNED TO THE HAZARDOUS MATERIAL STORAGE AREA AT THEEND OF EACH DAY.·AN EFFORT SHOULD BE MADE TO STORE ONLY ENOUGH PRODUCTS TO DO THE REQUIRED JOB.·THE CONTRACTOR SHALL PROVIDE TANKS OR BARRELS TO COLLECT LIQUID BYPRODUCTS THAT POSE APOLLUTION HAZARD.·THE POLLUTANTS SHALL BE REMOVED FROM THE SITE ON A WEEKLY BASIS AND DISPOSED OF INACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS.·ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY, IN ACCORDANCE WITH THEMANUFACTURE'S RECOMMENDED METHODS.·ALL REQUIRED CONTAINMENT / STORAGE UNITS / ABSORBENT MATERIAL AND REQUIRED DISPOSALSHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT·ALL STORAGE AREAS SHALL BE SECURED TO PREVENT UNAUTHORIZED ACCESS.18.SOLID WASTE·SOLID WASTE SHALL BE STORED IN APPROPRIATE CONTAINERS AND PROPERLY DISPOSED OF ON AREGULAR BASIS.·CONTAINERS SHALL BE COVERED TO PREVENT WIND BLOWING THE WASTE AROUND THE SITE.·MPCA DISPOSAL REQUIREMENTS WILL BE FOLLOWED FOR ALL SOLID WASTE.·SOLID WASTE STORAGE CONTAINERS AND PROPER DISPOSAL SHALL BE CONSIDERED INCIDENTAL TOTHE CONSTRUCTION CONTRACT.19.DUST CONTROL·THE CONTRACTOR SHALL USE A VARIETY OF DUST CONTROL INCLUDING BUT NOT LIMITED TO THEFOLLOWING:·RAPID STABILIZATION METHODS ON SLOPES·WATER ON ROADWAYS AND GRADED AREAS·ALTERNATIVES: IN THE FORM OF VEGETABLE POLYMERS, WATER AND CALCIUM CHLORIDE PETROLEUMEMULSION RESINS, OR ACRYLIC COPOLYMERS MAY ALSO BE USED.·ALL REQUIRED DUST CONTROL SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT AS PERSPECIFICATIONS.20.WINTER STABILIZATION·COVER EXPOSED SOILS ON OR AROUND NOV. 15TH AND/OR PRIOR TO TERMINATION OFCONSTRUCTION ACTIVITIES FOR WINTER·ALL EXPOSED SOILS TO BE COVERED WITH 2 TONS TYPE 1 MULCH·ALL EXPOSED SOILS TO BE SEEDED WITH MNDOT SEED MIX 150·ALL LOW POINTS IN ROADS TO BE ADEQUATELY DRAINED IN ACCORDANCE WITH NPDES DEWATERINGREQUIREMENTS PART IV. CONSTRUCTION ACTIVITY REQUIREMENTS. SECTION D. DEWATERING ANDBASIN DRAINING.·PERIMETER SILT FENCE OR OTHER CONTROLS TO BE INSTALLED 3-5 FEET FROM THE BACK OF THE CURBAND OUT OF THE PLOWED SNOW AREA.·PERIMETER CONTROLS AROUND PERMANENT STORMWATER BASINS TO BE INSTALLED AND MAINTAINED·INLET CONTROLS TO BE REMOVED ACCORDING TO LEGAL REQUIREMENTS WITH DOCUMENTATIONWITHIN 72 HOURS FROM LEGAL AUTHORITY.·IF WORK HAS OCCURRED NEAR OR IN STREAMS OR OTHER SURFACE WATERS, THE EXPOSED SOILSSHALL BE STABILIZED TO PROTECT AGAINST FLOODING AND SPRING RUNOFF TO THE 100-YR FLOODELEVATION.·ALL TEMPORARY AND PERMANENT STORMWATER BASINS AND SEDIMENT BASINS SHOULD HAVEOUTLETS AND STABILIZED EMERGENCY OVERFLOWS INSTALLED AS PER THE GRADING AND/OR UTILITYPLAN AND AT THE APPROVAL OF THE OWNER.21.NON-STORMWATER DEWATERING·HYDRANT FLUSHING: FLUSHING OF HYDRANTS WILL BE DISCHARGED·THROUGH TEMPORARY PIPES AS NECESSARY, ONTO IMPERVIOUS SURFACES OR TO STABILIZED ARESWITH ENERGY DISSIPATION AT THE DISCHARGE POINT. THE DISCHARGE SHOULD BE COLLECTED BY THESTORM WATER BASINS AND STORM SEWER SYSTEM.·POTABLE WATER DISCHARGE: ALL WATER LINES WILL BE FLUSHED USING HOSES AND DISCHARGEDONTO AN IMPERVIOUS SURFACE AND DIRECTED TO THE STORM SEWER INFRASTRUCTURE BYNON-EROSIVE MEANS.22.WORK NEAR OR IN IMPAIRED WATERS·EXPOSED SOILS MUST BE STABILIZED WITHIN 7 DAYS OF ACTIVITY TEMPORARILY OR PERMANENTLYCEASED.·TEMPORARY SEDIMENT BASIN NEEDED WITHIN AREAS 5 ACRE DISTURBANCE WITH COMMON POINT OFDISCHARGE.·IF WORK IS NEAR SPECIAL WATERS REFER TO APPENDIX A OF THE NPDES PERMIT FOR ADDITIONALNOTES AND REQUIREMENTS.·NO UNTREATED DEWATERING WILL TAKE PLACE AND DISCHARGE TO "IMPAIRED WATERS"·SEE PERMIT FOR ADDITIONAL NOTES AND REQUIREMENTS23.INFILTRATION/FILTRATION AREAS·FENCE OFF AREA PRIOR TO BEGINNING CONSTRUCTION.·EXCAVATION AREA SHALL TAKE PLACE AFTER CONTRIBUTING AREAS ARE AT FINAL GRADE ANDSTABILIZED.·DO NOT USE HEAVY/WHEELED EQUIPMENT IN FILTRATION AREA.·DIVERSIONS, REDUNDANT SEDIMENT AND EROSION CONTROLS MUST BE USED TO PROTECT AREA.·ENSURE 8 FT MAINTENANCE ACCESS IS ADEQUATE FOR AREA.·IF GRADING MUST OCCUR IN FILTRATION AREA, LEAVE GRADE 3 FT HIGH TEMPORARILY UNTIL AREA CANBE FINAL GRADED AND STABILIZED DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\CIVIL DETAILS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC8.0CIVIL DETAILS -UTILITY DETAILS1C8.02C8.03C8.04C8.05C8.06C8.0 DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\CIVIL DETAILS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC8.1CIVIL DETAILS -STORM SEWERDETAILSREVE7001-110-042DWG NO.1 OF 1SHEET1:40SCALEDWG SIZEA3130 VERONA AVEBUFORD, GA 30518PHN (770) 932-2443FAX (770) 932-2490www.nyloplast-us.com8 IN - 36 IN TYPICAL INSTALLATION OPTIONSTITLEPROJECT NO./NAMEMATERIALDATEREVISED BY8-10-00DATEAWADRAWN BYTHIS PRINT DISCLOSES SUBJECT MATTER IN WHICHNYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPTOR POSSESSION OF THIS PRINT DOES NOT CONFER,TRANSFER, OR LICENSE THE USE OF THE DESIGN ORTECHNICAL INFORMATION SHOWN HEREINREPRODUCTION OF THIS PRINT OR ANY INFORMATIONCONTAINED HEREIN, OR MANUFACTURE OF ANYARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERSIS FORBIDDEN, EXCEPT BY SPECIFIC WRITTENPERMISSION FROM NYLOPLAST.11-2-18NMHDUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLASTTSALPOLYNDUCTILEIRONTSALPOLYNDUCTILEIRON DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST WHEN ARE DRAIN BASINS USED?2808AG _ _ X2810AG _ _ X2812AG _ _ X2815AG _ _ X2818AG _ _ X2824AG _ _ X2830AG _ _ X2836AG _ _ XWHEN ARE INLINE DRAINS USED?2708AG _ _ X2710AG _ _ X2712AG _ _ X2715AG _ _ X2718AG _ _ X2724AG _ _ X2730AG _ _ XTYPICAL INSTALLATIONSTYPICAL INSTALLATION OF NYLOPLASTDRAIN BASIN AND INLINE DRAIN1: TO ENTER AN EXISTING LINE USING A TEE & RISER2: AT THE BEGINNING OF A DRAIN LINE USING AN ELBOW & RISERTEEELBOW12" DRAIN BASIN(2) INLET & OUTLETADAPTERS CAN BEPUT ON ANY ANGLE1: TO CHANGE ELEVATION2: TO CHANGE PIPE DIAMETER3: TO CHANGE PIPE TYPE4: FOR SHALLOWAPPLICATIONS5: TO CHANGE DIRECTIONA°RISERDRAIN BASININLINE DRAIN10" INLINE DRAIN10" INLINE DRAIN(3) VARIABLE ELEVATIONWATERTIGHT ADAPTERS AVAILABLEFOR MOST COMMON PLASTIC PIPING SYSTEMS8"6"CORRUGATEDHDPE PIPESMOOTH WALLPVC1 - STRUCTURES & ADAPTERS AVAILABLE IN SIZES 8" - 36"2 - ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0° TO 360°, TO DETERMINE MINIMUM ANGLE BETWEEN ADAPTERS SEE DRAWING NO. 7001-110-0123 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING RESTRICTIONS SEE DRAWING NO. 7001-110-0654 - REDUCING CONES DOWN TO 30" DIAMETER WILL BE REQUIRED FOR 36" DRAIN BASINS.©2010 NYLOPLAST1C8.12C8.14C8.1REVF7001-110-111DWG NO.1 OF 1SHEET1:25SCALEDWG SIZEA3130 VERONA AVEBUFORD, GA 30518PHN (770) 932-2443FAX (770) 932-2490www.nyloplast-us.comDRAIN BASIN & INLINE DRAIN NON TRAFFIC INSTALLATIONTITLEPROJECT NO./NAMEMATERIALDATEREVISED BY9-30-99DATECJADRAWN BYTHIS PRINT DISCLOSES SUBJECT MATTER IN WHICHNYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPTOR POSSESSION OF THIS PRINT DOES NOT CONFER,TRANSFER, OR LICENSE THE USE OF THE DESIGN ORTECHNICAL INFORMATION SHOWN HEREINREPRODUCTION OF THIS PRINT OR ANY INFORMATIONCONTAINED HEREIN, OR MANUFACTURE OF ANYARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERSIS FORBIDDEN, EXCEPT BY SPECIFIC WRITTENPERMISSION FROM NYLOPLAST.03-11-16NMHDRAIN BASININLINE DRAINTHE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHERGRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I,CLASS II, OR CLASS III MATERIAL AS DEFINED IN ASTM D2321.BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BEPLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321.NON TRAFFIC INSTALLATIONTOP SOILGRATE/COVERTOP SOILGRATE/COVER©2011 NYLOPLAST4" MIN ON 8" - 24"6" MIN ON 30" & 36"THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHERGRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I,CLASS II, OR CLASS III MATERIAL AS DEFINED IN ASTM D2321.BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BEPLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321.REVD7003-110-057DWG NO.1 OF 1SHEET1:40SCALEDWG SIZEA3130 VERONA AVEBUFORD, GA 30518PHN (770) 932-2443FAX (770) 932-2490www.nyloplast-us.comINLINE DRAIN WITH DOME GRATEQUICK SPEC INSTALLATION DETAILTITLEPROJECT NO./NAMEMATERIALDATEREVISED BY03-25-10DATEEBCDRAWN BY03-15-16NMHMINIMUM PIPE BURIALDEPTH PER PIPEMANUFACTURERRECOMMENDATIONINVERT ACCORDING TOPLANS/TAKE OFFNYLOPLAST INLINE DRAIN WITH DOME GRATE8" - 30"1 - 8" - 30" DOME GRATES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05.2 - DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212 FOR CORRUGATED HDPE (ADS N-12/HANCOR DUAL WALL), N-12 HP, & PVC SEWER (4" - 24").3 - 8" - 30" DOME GRATES HAVE NO LOAD RATING(3) VARIOUS TYPES OF INLET & OUTLET ADAPTERSAVAILABLE: 4" - 30" FOR CORRUGATED HDPE(ADS N-12/HANCOR DUAL WALL, ADS/HANCORSINGLE WALL), N-12 HP, PVC SEWER (EX: SDR 35),PVC DWV (EX: SCH 40), PVC C900/C905,CORRUGATED & RIBBED PVCWATERTIGHT JOINT(CORRUGATED HDPE SHOWN)THIS PRINT DISCLOSES SUBJECT MATTER IN WHICHNYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPTOR POSSESSION OF THIS PRINT DOES NOT CONFER,TRANSFER, OR LICENSE THE USE OF THE DESIGN ORTECHNICAL INFORMATION SHOWN HEREINREPRODUCTION OF THIS PRINT OR ANY INFORMATIONCONTAINED HEREIN, OR MANUFACTURE OF ANYARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERSIS FORBIDDEN, EXCEPT BY SPECIFIC WRITTENPERMISSION FROM NYLOPLAST.©2013 NYLOPLAST(1) INTEGRATED DUCTILE IRONGRATE TO MATCH BASIN O.D.THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHERGRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I,CLASS II, OR CLASS III MATERIAL AS DEFINED IN ASTM D2321.BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BEPLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321.3C8.11FILTRATION BASIN CONSTRUCTION SEQUENCING1.Install appropriate temporary erosion control devices to preventsediment from leaving or entering the practice during construction.2.All down-gradient perimeter sediment control bmp's must be inplace before any up gradient land disturbing activity begins.3.Perform continuous inspections of erosion control practices,especially after each rainfall event.4.Install all utilities (water, sanitary sewer, electric, natural gas,phone, fiber optic, etc) prior to setting final grade of filtration basin.5.Rough grade the site. If filtration areas are being used astemporary sediment basins during construction, leave a minimumof 1 feet of cover over the practice to protect the underlying soilsfrom clogging.6.Complete, stabilize, and vegetate all other site improvements.7.Construct and vegetate basin following stabilization of contributingdrainage area. Ensure that critical elevations, such as underdraininvert, top of media, top of mulch, and invert of overflow structure(if present) are correct.8.Remove temporary erosion control devices after the contributingdrainage area is adequately vegetated.CLEANOUT (TYPICAL)12FILTRATION SECTION(SHALL ADHERE TO MPCA MN STORMWATER GUIDELINES)3" MULCH30" FILTRATION MEDIA(MIX C SUITABLE FOR FILTRATION W/UNDERRAIN)3" CLEAN EMBEDMENT STONE COVER (#57 STONE)6" PERFORATED HDPE OR PVC UNDERDRAIN3" CLEAN EMBEDMENT STONE BEDDING (#57 STONE)TOTAL FILTRATION SECTION DEPTH = 3.75'WATER QUALITY VOLUME (WQV) ELEVATIONTOTAL STORAGE VOLUME ELEVATION994.50991.00989.00985.50TOP OF BASIN BERM995.00EMERGENCY SPILLWAYWQV ELEV.BOTTOM OF BASINUNDERDRAIN OUTLET INV.3.50'2.00'3.50'2=/>3.00'SEPARATION TO BEDROCK OR GROUNDWATER3NON-COMPACTED SUBGRADE (SEE STORMWATER MANUAL FOR SUBGRADE PREP.)3FILTRATION BASIN GENERAL NOTES1.In the event that sediment is introduced into the basin during orimmediately following excavation, this material shall be removedfrom the basin prior to continuing construction.2.See Minnesota Stormwater Manual for material specificationsrecommendations for filtration soil mixes, mulch, etc.3.Design is based on the WQV draining within 48 hours maximum.MAX. 3L:1H SLOPEFILTRATION BASIN WITH UNDERDRAINNOT TO SCALE DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\CIVIL DETAILS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC8.2CIVIL DETAILS -SITE DETAILS1C8.22C8.23C8.24C8.25C8.26C8.27C8.28C8.2 DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\CIVIL DETAILS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC8.3CIVIL DETAILS -ADA DETAILS1C8.32C8.33C8.34C8.3 DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\CIVIL DETAILS.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:Sheet:XX.XX.XXN O T F O R C O N S T R U C T I O N I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalEngineer under the laws of theState of Minnesota.53735Peter S Moreau, PEC8.4CIVIL DETAILS -ADA DETAILSCONTINUED1C8.41C8.43C8.5 MIN N E S O T A H I G H W A Y N O . 4 1 ( H A Z E L T I N E B L V D ) ORIOLE AVENUE OEOEOEOE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G||LODLOD LOD LODLOD LOD LOD LODL O D L O DLODLODLODLODLODLOD LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LODLODLODLODLODLODLO D LO D LO D LO D LO D LO D2597259825992600259625952594 25932591259225902589258625852583258425802581258225792577257825762575DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\LANDSCAPE PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalLandscape Architect under thelaws of the State of Minnesota.Sheet:XX.XX.XX53234Joshua J McKinney, PLAN O T F O R C O N S T R U C T I O NL0.1TREE INVENTORYSCALE IN FEET08040LEGENDTREE PROTECTION FENCE DETAILTREE INVENTORYSITE AREA:5.51 ACEXISTING SITE TREE COVERAGE AREA1.58 ACEXISTING SITE TREE COVERAGE PERCENTAGE28.8%BASE LINE TREE COVERAGE (PER TABLE 18-61-2b)20%TREE CANOPY ACREAGE TO REMAIN1.29 ACTREE CANOPY PERCENTAGE TO REMAIN23%NO TREE MITIGATION REQUIREDMAINTAIN EXISTINGGRADE WITH THE TREEPROTECTION FENCEUNLESS OTHERWISEINDICATED ON THEPLANS.2" X 6' STEEL POSTSOR APPROVED EQUAL.5" THICKLAYER OF MULCH.NOTES:1- LOCATE FENCING PER TREEPROTECTION & EROSION CONTROLPLANS.2- NO PRUNING SHALL BE PERFORMEDEXCEPT BY APPROVED ARBORIST.3- NO EQUIPMENT SHALL OPERATEINSIDE THEPROTECTIVE FENCING INCLUDINGDURING FENCEINSTALLATION AND REMOVAL.SECTION VIEWKEEP OUTTREEPROTECTIONAREATREE PROTECTIONFENCE: 48" HIGH DENSITYPOLYETHYLENE FENCINGWITH 3.5" X 1.5"OPENINGS; COLOR-ORANGE. STEEL POSTSINSTALLED AT 8' O.C.TREE PROTECTION FENCE/ LIMITS OF DISTURBANCETREES TO BE REMOVEDLODEXISTING TREE CANOPYTREE CANOPY TO REMAINTREE CANOPY TO BE REMOVEDTAG IDSPECIESDBHSTATUS2575RED PINE14PRESERVE2576SPRUCE18REMOVE2577LOCUST19REMOVE2578ASH13REMOVE2579WT. PINE21REMOVE2580MAPLE14PRESERVE2581BIRCH12PRESERVE2582ASH14PRESERVE2583LOCUST16PRESERVE2584BIRCH18PRESERVE2585ASH27REMOVE2586ASH19REMOVE2587ASH18OFF SITE2588ASH18OFF SITE2589BASSWOOD22REMOVE2590ASH18REMOVE2591ELM21REMOVE2592ASH21REMOVE2593ASH13REMOVE2594CRABAPPLE13REMOVE2595WILLOW18REMOVE2596WILLOW39REMOVE2597ASH26REMOVE2598MAPLE12REMOVE2599MAPLE13REMOVE2600MAPLE14REMOVETREE PRESERVATION CALCULATIONS 3 STORYMULTIFAMILY44 UNITSFFE: 1011.00GFE: 1000.33HYDSTORMWATERFILTRATION BASINTOP BERM: 995.00EO: 994.50HWL:994.39BOT:989.00BOT(SAND):985.25WLWLWL |||||||||||||||DDDSSSPROPOSED PUBLICDRAINAGE, UTILITY ANDROADWAY EASEMENTMIN N E S O T A H I G H W A Y N O . 4 1 ( H A Z E L T I N E B L V D ) ORIOLE AVENUE OEOEOEOE OE OE OE OE OE OE OE UE UE UE UE UE UE UE UE UE UE G G G G G G G G G G G G||9SX216NX21JC1UA1AF31RA21GT24NX8HP8JC5HP8JC3HP3SX23SX23JC5HP5HX410JC4AC4AF5PA2DescriptionRev.DateMINNEWASHTA APARTMENTS CHANHASSEN, MINNESOTA07.11.2025CITY SUBMITTALSheet Title:Project #:Drawn By:Checked By:Issue Date:25-102PMJM06/13/2025G:\Shared Drives\Active Projects\Chanhassen\Headwaters Dev - Minnewashta MF\CAD\Sheets\LANDSCAPE PLAN.dwgProject Title: HEADWATERS 6757 KARMEN AVENUE ALBERTVILLE, MN Client:Date: Lic. No.:I hereby certify that this plan,specifications or report wasprepared by me or under mydirect supervision and that I am aduly licensed ProfessionalLandscape Architect under thelaws of the State of Minnesota.Sheet:XX.XX.XX53234Joshua J McKinney, PLAN O T F O R C O N S T R U C T I O NL1.0LANDSCAPE PLANLANDSCAPE NOTES1.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/ORELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ONRECORDS OF THE VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTSTAKEN IN THE FIELD. THE INFORMATION SHALL NOT BE RELIED ON AS BEINGEXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONSPRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OR ENGINEER OFDISCREPANCIES.2.ALL SANITARY SEWER, STORM SEWER AND WATER MAIN MATERIAL ANDINSTALLATIONS SHALL BE PER CITY REQUIREMENTS, MINNESOTA PLUMBINGCODE, AND IN ACCORDANCE WITH THE CURRENT EDITION OF "STANDARDSPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION ANDSANITARY SEWER AND STORM SEWER INSTALLATION" AS PREPARED BY THE CITYENGINEERS ASSOCIATION OF MINNESOTA.3.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN THE NECESSARYFEDERAL, STATE AND LOCAL PERMITS FOR THE PROPOSED WORK OR VERIFYWITH THE OWNER OR ENGINEER THAT PERMITS HAVE BEEN OBTAINED. PERMITFEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISESCALE IN FEET08040LANDSCAPE REQUIREMENTSTREES PLANTEDOVERSTORY TREESCONIFEROUS TREESORNAMENTAL TREESTOTAL TREESPARKING LOT PLANTINGAREA REQUIREMENT75416LANDSCAPING REQUIRED:·NO TREES ARE REQUIRED FOR MITIGATION- SEE L0.1·LANDSCAPING MUSE MEET 1% OF PROJECT BUDGET (Sec. 20-1179)·8% MINIMUM PARKING LOT LANDSCAPE AREA (20-1181)8%16.11%SYMBOLCODECOMMON / BOTANICAL NAMESIZETYPEQTYTREESUAAMERICAN ELM / ULMUS AMERICANA `PRINCETON`B & B2.5"CAL1AFSIENNA GLEN MAPLE / ACER FREEMANII `SIENNA GLEN`B & B2.5"CAL5GTSKYLINE HONEY LOCUST / GLEDITSIA TRIACANTHOS `SKYLINE`B & B2.5"CAL1CONIFERSPA2NORWAY SPRUCE / PICEA ABIESB & B5ORN. TREESACAUTUMN BRILLIANCE SERVICEBERRY / AMELANCHIER CANADENSIS `AUTUMN BRILLIANCE`B & B2"CAL4CODECOMMON / BOTANICAL NAMESIZETYPEQTYSHRUBSRA2GRO-LOW FRAGRANT SUMAC / RHUS AROMATICA `GRO-LOW`5 GAL31SX2LILAC / SYRINGA X `BLOOMERANG`5 GAL15HPLITTLE LIME HYDRANGEA / HYDRANGEA PANICULATA `JANE`5 GAL21JCMINT JULEP JUNIPER / JUNIPERUS CHINENSIS `MINT JULEP`5 GAL50PERENNIALSHX4PLANTAIN LILY / HOSTA X `GUACAMOLE`1 GAL5NXWALKERS LOW CATMINT / NEPETA X FAASSENII `WALKERS LOW`1 GAL40SYMBOLCODECOMMON / BOTANICAL NAMEQTYGROUND COVERSMS8FORMERLY MNDOT SEED MIX 33-261 / MNDOT SEED MIX WET DITCH15,797 SFMS5FORMERLY MNDOT SEED MIX 35-221/36-211 / MNDOT SEED MIX SOUTHERN SHORTGRASS ROADSIDE63,270 SFTSSOD / TURF SOD HIGHLAND SOD24,635 SFPLANT SCHEDULE