Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CAS-09_LAKE LUCY ROAD SUBDIVISION
15Y BUFFER AREA PLANTING DETAIL ENTRY MONUMENT PLANTING DETAIL f2r,,6 �qemevoo�, Re an 4kt r, fv 1( gwe oed LutndheTr? ?6 SHeek L 1,02. Urc4 PLANT SCHEDULE - OVERALL SITE KEY I CITY COMMON/BOTANICAL NAME SIZE ROOT REMARKS SHRUBS & PERENNIALS COMMON LILAC / CL 19 S rin a vul aris #5 cont. Purple variety DBN 19 DIABOLO NINEBARK/ #10 cont. - Physocarpus opulifolius'Monlo' RED TWIGGED DOGWOOD / RTD 21 Cornus sericea'Baile i' #5 Cont. - YTD 10 BUD'S YELLOW DOGWOOD / #5 Cont. Cornus sericea'Bud's Yellow' FDD 9 FIREDANCE DOGWOOD / #5 Cont. - Cornus sericea'Bailadeline' FW 40 FLAME WILLOW / #5 Cont. - Salix 'Flame' GLS 40 GROW LOW SUMAC / #5 Cont. Rhus aromatica'Grow-Lo' SEE PLANTING DETAILS AND NOTES ON SHEET L8.01. IN CASE OF DESCREPANCY BETWEEN PLANS AND PLANT SCHEDULE, PLANS WILL PREVAIL. CONTACT LANDSCAPE ARCHTITECT FOR CLARIFICATION. CITY OF CHANHASSEN RECEIVED SEP 172018 CHANHASSEN PLANNING DEPT UAMCM WORM - � ~ = PA M M ~ M M Pk=474-M - Fat ®474-M NORTH SCALE: 1 " = 20' 0 20 40 Q a W ca = o H cri Z c_ O� g W (I) ca � L i C ? z ICU � Q U PREPARED MR. - Yosemite Holdings LLC PREPARED BY.• I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the state of Minnesota. SIGNATURE: PRINTED NAME: DATE: LIC. NUMBER: NO. REVISION/ISSUE DATE 1 NEW CORNER PLANTINGS 09.12-18 DESIGNED: DML SHEET: L 1. 02 DRAWN: DML CHECKED: DML DATE: SM7 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone:952.227.1100 Fax: 952.227.1110 Building Inspections Phone:952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone:952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone:952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone:952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone:952.2271300 Fax: 952.227.1310 Senior Center Phone:952.227.1125 Fax: 952.227.1110 Website www.ci.chanhassen.mn.us August 24, 2016 Mr. Terry Forbord Yosemite Holding, LLC 4960 Sussex Place Shorewood, MN 55331 Re: Anthem on the Park Final Plat, Development Contract, and Plans & Specifications — Planning Case #2016-09 Dear Mr. Forbord, This letter is to inform you that on August 22, 2016, the Chanhassen City Council approved: 1. The final plat for Anthem on the Park subject to the conditions of the staff report; 2. The development contract for Anthem on the Park; and 3. The plans and specifications for Anthem on the Park Plat approval was subject to the following conditions: Buildins: 1. Provide a 1:200 "clean" plat drawing. 2. Demolition permits required for the removal of any existing structures. 3. Buildings may be required to be designed by an architect and/or engineer as determined by the Building Official. 4. A final grading plan and soils report must be submitted to the Inspections Division before permits can be issued. Retaining walls over four feet high require a permit and must be designed by a professional engineer. 6. Each lot must be provided with separate sewer and water services. 7. The applicant and or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. &CANNE:p Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Anthem on the Park, Final Plat — Planning Case 2016-09 August 25, 2016 Page 2 of 6 Engineering: 1. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: the east side of Lot 1. 2. The applicant shall revise lots 6-9 be a full -basement, rambler -style home. 3. The grading plan shall be revised to show a spot elevation at the centerline of each driveway where it meets Anthem Place prior to issuance of building permits. 4. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9 prior to start of construction. 5. The plans shall identify the areas intended for stockpiling materials on site during construction. 6. Any retaining wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA) per an HOA covenant to be recorded prior to issuance of any building permit for Lots 1-12, Block 1. 7. The applicant shall have their surveyor confirm all easements and right of way shown with a recent title survey before final plat documents are recorded. 8. The retaining wall on Lots 5 and 6 requires an encroachment agreement to be recorded with the final plat. 9. An entry monument is shown on Lot 1. This shall require a paper easement between Lot 1 and the HOA that shall be recorded prior to construction of the entry monument. 10. The applicant shall include the horizontal alignment tabulation for Anthem Place in the plans. 11. The developer shall show construction limits for utility work below Yosemite Ave and submit a staging and restoration prior to the start of utility construction. 12. The plan shall be revised to install a street light at the intersection of Anthem Place and Yosemite Avenue. 13. Driveway grades shall be shown on the plan in the final plat submittal. 14. Driveways shall be designed to meet all standards in City Code §20-1122. Anthem on the Park Planning Case 2016-09 Page 3 of 6 15. The pedestrian ramp on the northwest corner of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. The plan shall be revised to include the replacement prior to the start of construction. 16. The plan shall be revised to note that sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. 17. The portion of the sanitary services that lies within the right-of-way shall be gravity -flowing. 18. MH #4 shall be moved north to shorten the length of services for Lots 8, 9 and 10. 19. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 20. Water and sewer partial hook-ups are due at the time of final plat. The partial hook-up fees will be assessed at the rate in effect at that time. 21. If the entry monument is to be built on City -owned Outlot A, the developer shall enter into an encroachment agreement with the City, prior to construction of the monument. 22. The plan shall be revised prior to the start of construction to provide velocity dissipation for the draintile outlet on Lot 10. 23. The plan shall be revised, prior to the start of construction, to move the yard drain on Lot 9 to the bottom of the swale. 24. The HOA shall own and maintain any draintile that crosses property lines. This shall be included in the HOA covenant documents to be recorded prior to issuance of any building permit for Lots 1-12, Block 1. 25. Lots 1-12, Block 1 shall be under the same Homeowners Association the covenants of which shall be recorded prior to issuance of any building permit for Lots 1-12, Block 1. 26. The existing survey shall can out existing structures that are not used as residents as "structures" rather than "houses". This shall be revised prior to start of construction. 27. The erosion control plan be revised prior to construction, to require steel posts for all silt fence. 28. The profile alignment for Anthem Place shall be revised, prior to the start of construction, at Sta 16+00, so that the vertical curve is a minimum of 144 feet in length, or otherwise adjusted to meet the City Code requirements § 18-27(h). Anthem on the Park Planning Case 2016-09 Page 4 of 6 29. The plan shall be revised, prior to the start of construction, to move the hydrant at Anthem Place and Yosemite Avenue to the north side of Anthem Place so as to provide a stub for future watermain connection to the north. Environmental Resources: Ash trees shall be removed within the proposed tree preservation area. Removals shall be directed by the city. Reforestation trees may be located within the Outlot. 2. Colorado spruce and pin oak selections shall be replaced with species suitable for the area. Fire: 1. A three-foot clear space shall be maintained around fire hydrants. 2. Street sign(s) (temporary allowed) shall be installed prior to building permits being issued. Fire Marshal must approve signage. 3. Prior to combustible home construction fire apparatus access roads capable of supporting the weight of fire apparatus shall be made serviceable. 4. An addition address number will be required for lot #9. Its location shall be at the entrance of the private driveway. Sign location and size must be approved by the Fire Marshal. 5. Prior to combustible construction fire hydrants shall be made serviceable. 6. No burning permits will be issued for tree/ brush removal. Parks: 1. Full park dedication fees for 10 lots shall be collected per city ordinance in lieu of requiring parkland dedication. 2. Dedication of a 20-foot wide trail and a utility and drainage easement between lot 7 and lot 8. 3. Planning, engineering, and construction per city standards of an 8-foot wide bituminous trail within this easement connecting public Street "A" and Pheasant Hill Park. PlanninE: 1. The front lot lines for lots 5 shall be the north property line, for lots 8 and 9 the east lot lines. 2. The entry monument may not be located within the right-of-way and must be located outside of the sight triangle. A sign easement shall be dedicated where the monument sign will be located. Anthem on the Park Planning Case 2016-09 Page 5 of 6 Water Resources: 1. Runoff rates and volumes cannot be increased to the south. 2. Curve numbers and drainage areas shall accurately reflect pre and post -construction conditions. 3. Any disturbance of the buffer areas shall be restored with native vegetation appropriate to the area and the plans shall note this and the seed mix to be used. 4. A plan shall be prepared showing the placement of wetland buffer monuments including a monument at midpoint of east lot line for Lot 12. 5. All buffer monuments shall be installed prior to the sale of any lots. 6. The development contract shall include language indicating that the Homeowners' Association shall be responsible for any landscaping work associated with the biofiltration feature and the city shall maintain the associated infrastructure including the underdrain, the filtration media and the piped storm sewer conveyance system. 7. A detailed plan of the filtration basins, consistent with the MN Stormwater Manual shall be submitted with the final plat submittal for review and approval by city staff. It shall include, at a minimum, a plan view, a profile view, all necessary elevations, any in situ soil preparation, methodologies to be employed to protect from construction traffic, soil filter media specifications, any plantings and any appurtenant work to be done. 8. Underdrains and drain file shall have tracer wire and cleanouts. 9. Storm Water Utility Connection charges due at the final plat are $58,880.00. Two signed mylar copies of the final plat shall be submitted to our office for signatures. One 1"=200' scale mylar reduction of the final plat, three 1"=200' scale paper reductions of the final plat and one 1 "=200' scale paper reduction of the final plat with just street names and lot and block numbers shall be submitted. In addition, a digital copy in .dxf format and a digital copy in .tif format (pdf compatible) in Carver County coordinates of the final plat shall be submitted. A recent copy of the title commitment shall be provided. Electronic copies of the drainage model shall be provided. A $766,414.30 letter of credit or escrow for the developer -installed improvements, the $170,081.81 cash administration fee and the fully -executed development contract (Developer Installed Improvements) must be submitted and shall be submitted prior to scheduling a pre - construction meeting. A warranty deed transferring Outlot A to the City shall be prepared and executed for recording with the final plat documents. A 20-foot wide trail easement and an encroachment agreement for Anthem on the Park Planning Case 2016-09 Page 6 of 6 the retaining walls shall also be prepared and submitted for recording with the final plat. The Home Owners Association documents must be submitted and reviewed and then recorded at Carver County prior to issuance of any building permits within the development. All current year taxes must be paid in full and any delinquent property taxes or green acres tax. Once everything is submitted, please contact Project Engineer Stephanie Smith at 952-227-1165 or by email at sbsmithaci.chanhassen.mn.us to coordinate the preconstruction meeting. Should you have any questions, please contact me at (952) 227-1131 or by email at bgenerousa-ci.chanhassen.mn.us. Sincerely, Robert Generous, AICP Senior Planner ec: Kate Aanenson, Community Development Director Todd Gerhardt, City Manager Todd Hoffman, Parks & Recreation Director Terry Jeffery, Water Resources Coordinator Jerry Mohn, Building Official Jill Sinclair, Environmental Resource Specialist Stephanie Smith, Project Engineer Roger Humphrey, Stantec Consulting Services, Inc. I (, cfy CITY OF CAANHA3SEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone:952.227.1100 Fax:952.227,1110 Building Inspections Phone:952.227.1180 Fax:952.227.1190 Engineering Phone:952.227.1160 Fax: 952.227.1170 Finance Phone:952.2271140 Fax: 952.227.1110 Park 3 Recreation Phone:952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone:952.227.1400 Fax:952.227.1404 Planning & Natural Resources Phone:952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone:952.227.1300 Fax: 952.227.1310 Senior Caller Phone:952.2271125 Fax: 952.227.1110 Website www.ci.chanhassennn.us June 22, 2016 Mr. Terry Forbord Yosemite Holding, LLC 4960 Sussex Place Shorewood, MN 55331 Re: Planning Case #2016-09 — Rezoning and Preliminary Plat with Variances, Anthem on the Park Dear Mr. Forbord, This letter is to inform you that on June 13, 2016, the Chanhassen City Council approved: Rezoning of the property from Rural Residential, RR, to Single -Family Residential, RSF, and Preliminary plat approval for 12 lots, one outlot and public right-of-way with variances for the use of flag lots, cul-de-sac bubble size and a local street centerline offset of less than 300 feet and a building setback variance from the cul-de-sac bubble for lot 11 subject to the following conditions: Buildine: L Provide a 1:200 "clean" plat drawing. 2. Demolition permits required for the removal of any existing structures. 3. Buildings may be required to be designed by an architect and/or engineer as determined by the Building Official. 4. A final grading plan and soils report must be submitted to the Inspections Division before permits can be issued. 5. Retaining walls over four feet high require a permit and must be designed by a professional engineer. 6. Each lot must be provided with separate sewer and water services. 7. The applicant and or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. SCANNEC Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Engineering: 1. The applicant shall include a chart with the maximum hardcover allowed on each lot. 2. The lots shall be graded to drain away from proposed building locations. 3. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: Lot 6 backyard, Lot 7 backyard, the east side of Lot 1, the highpoint of the side yard of Lot 10. 4. The applicant shall revise lots 6-9 be a full -basement, rambler -style home. 5. The grading plan shall be revised to show a spot elevation at the centerline of each driveway where it meets Street A. 6. Draintile is required for all lots where stormwater nmoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9. 7. The applicant shall identify the discharge point of the culvert shown on the existing topography near the existing driveway of 1600 Lake Lucy Road. If it is a driveway culvert, the applicant shall have it removed or bulkhead and abandoned. 8. The plans shall identify the areas intended for stockpiling materials on site during construction. 9. Top and bottom wall elevations shall be shown for the retaining wall on the eastern property line of Lot 9. 10. Any retaining wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA). 11. The development plans shall call out the material of the retaining wall. The following materials are prohibited for retaining wall construction: smooth face, poured in place concrete (stamped or patterned is acceptable), masonry, railroad ties and timber. 12. Boulder walls shall not be taller than six feet. 13. The applicant shall have their surveyor confirm all easements and right of way shown with a recent title survey before final plat. 14. Easements over drainage swales, basins and storm water pipes shall be called out as "Drainage and Utility" easements. 15. Retaining walls and an entry monument are proposed within City easements. These elements shall be relocated outside of the standard perimeter drainage and utility easement boundaries, expecting the retaining wall on Lots 5 and 6. 16. The retaining wall on Lots 5 and 6 requires an encroachment agreement. 17. The preliminary plat shows a signage easement on Lot 1. This shall be a paper easement between Lot 1 and the development's HOA. 18. The applicant shall name Street A with coordination with the Fire Marshall prior to submittal for final plat review. 19. The applicant shall include the horizontal alignment tabulation for Street A in the plans. 20. The developer shall show construction limits for utility work below Yosemite Ave and submit a staging and restoration plan with their final plat submittal. 21. A street light shall be installed at the intersection of Street A and Yosemite Avenue. 22. Driveways shall be shown on the plan in the final plat submittal. 23. Driveways shall be designed to meet all standards in City Code §20-1122. 24. The sidewalk does not continue north of Street A, therefore the pedestrian ramp shall not be constructed at the intersection of Street A and Yosemite Avenue. 25. The pedestrian ramp on the northwest comer of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. 26. The sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. T 27. The portion of the sanitary services that lies within the right-of-way shall be gravity -flowing. 28. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 29. SMH 5 shall be moved to be centered between the building pads for Lots 5 and 6. 30. The sanitary services within the cul-de-sac bubble shall be revised to eliminate bends and cleanouts within the right-of-way. 31. The utility plan sheet shall be revised to call out the City of Chanhassen as the local authority in Note 13. 32. The plans shall call out C900 material for the water main pipe. 33. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 34. Two additional hydrants shall be installed, one at the intersection of Street A and Yosemite Avenue and one at Station 3+00 of Street A. 35. Water and sewer partial hook-ups are due at the time of final plat. The partial hook-up fees will be assessed at the rate in effect at that time. Environmental Resources: I. A revised tree preservation plan and calculations must be submitted to the city prior to final approval. 2. All required plantings must be located on private property outside of public right-of-way. The landscape plan shall be changed to reflect this requirement. 3. Ash trees shall be removed within the proposed tree preservation area. Removals shall be directed by the city. 4. A revised landscape plan with a detailed plant schedule listing quantities for each individual species shall be submitted to the city before final approval. 5. The proposed tree preservation area in the northeast comer of the development shall be incorporated into outlot including wetlands. Fire: 1. Proposed street name will be submitted by the applicant to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval. 2. Two addition fire hydrants will be required: one at the south/west corner of Yosemite and Street "A" and the second one on the south side of street "A" by Sta.3+00. 3. A three-foot clear space shall be maintained around fire hydrants. 4. Street sign(s) (temporary allowed) shall be installed prior to building permits being issued. Fire Marshal must approve signage. 5. Prior to combustible home construction fire apparatus access roads capable of supporting the weight of fire apparatus shall be made serviceable. 6. An addition address number will be required for lot #9. Its location shall be at the entrance of the private driveway. Sign location and size must be approved by the Fire Marshal. 7. Prior to combustible construction fire hydrants shall be made serviceable. 8. No burning permits will be issued for tree/ brush removal. Parks: 1. Full park dedication fees for 10 lots shall be collected per city ordinance in lieu of requiring parkland dedication. 2. Dedication of a 20-foot wide trail and a utility and drainage easement between lot 7 and lot 8. 3. Planning, engineering, and construction per city standards of an 8-foot wide bituminous trail within this easement connecting public Street "A" and Pheasant Hill Park. 4. Relocation of the public sidewalk to the south side of Street "A". Planning: 1. The front lot lines for lots 5 shall be the north property line, for lots 8 and 9 the east lot lines. 2. The entry monument may not be located within the right-of-way and must be located outside of the sight triangle. A sign easement shall be dedicated where the monument sign will be located. Water Resources: 1. Runoff rates and volumes cannot be increased to the south. 2. Curve numbers and drainage areas shall accurately reflect pre and post -construction conditions. 3. The stoimwater management practices shall achieve a new overall reduction of at least 90% for total suspended solids and 60% for total phosphorous using industry accepted removal rates. This includes manipulation of the NURP50 Particle Distribution filtration efficiencies to match accepted literature values. 4. The sump manhole and SAFL Baffle shall not be included in the P8 model as the P8 model already assumes pretreatment. 5. All sumps with SAFL baffles shall be a minimum of 3 feet in depth. 6. The applicant shall prepare and submit a Surface Water Pollution Prevention Plan that contains all required elements from Parts III and IV of the NPDES/SDS Construction Permit. This shall be a standalone document. 7. Any disturbance of the buffer areas shall be restored with native vegetation appropriate to the area and the plans shall note this and the seed mix to be used. 8. A plan shall be prepared showing the placement of wetland buffer monuments. 9. All buffer monuments shall be installed prior to the sale of any lots. 10. All stormwater practices shall be place into a drainage and utility easement if not included in an outlot. 11. All drainage swales shall be included in drainage and utility easements and the development shall make any future builder and homeowner aware that these may not be altered without submittal of a revised grading plan to the city and subsequent approval of that revised plan. 12. The development contract shall include language indicating that the Homeowners' Association shall be responsible for any landscaping work associated with the biofiltration feature and the city shall maintain the associated infrastructure including the underdrain, the filtration media and the piped storm sewer conveyance system. 13. The south biofiltration feature shall have a skimmer emergency overflow structure designed and installed. 14. A detailed plan of the filtration basins, consistent with the MN Stormwater Manual shall be submitted with the final plat submittal for review and approval by city staff. It shall include, at a minimum, a plan view, a profile view, all necessary elevations, any in situ soil preparation, methodologies to be employed to protect from construction traffic, soil filter media specifications, any plantings and any appurtenant work to be done. 15. Underdrains and drain tile shall have tracer wire and cleanouts. 16. Pretreatment shall be required for all filtration basins receiving piped discharge. 17. A forebay, surge basin or other approved energy dissipation device shall be provided for the inlet into the biofiltration feature included in the outlot. The selected practice must not create undue maintenance burdens. The end result shall be non -erosive velocities into the basin. 18. Efforts shall be made to raise the elevations of Lots 2 through 5 to assure positive flow towards the street and ultimately to the treatment devices. 19. The applicant, their consultant and city staff shall collaborate to minimize drainage concerns in the back and side yards of lots 6 through 10. 20. Storm Water Utility Connection charges due at the final plat are estimated to be $58,880.00. Final plat documents must be submitted to the city 30 days prior to the City Council meeting in which you wish to have your final plat approved. Conditions of the preliminary plat approval must be addressed for final plat approval. Enclosed is the list of items required for submittal for final plat approval. The rezoning of the residential lots shall not be official until approval of the final plat and execution of the project development contract. Should you have any questions, please contact me at (952) 227-1131 or by email at bgenerousna,ci.chanhassen.mn.us. Sincerely Robert Generous, AICP Senior Planner Enclosure c: Almond & Carolyn Krueger Craig & Deanna Claybaugh ec: Kate Aanenson, Community Development Director Todd Gerhardt, City Manager Todd Hoffman, Parks & Recreation Director Terry Jeffery, Water Resources Coordinator Jerry Mohn, Building Official Jill Sinclair, Environmental Resource Specialist Stephanie Smith, Project Engineer Roger Humphrey, Stantec Consulting Services, Inc. ITEMS REQUIRED FOR FINAL PLAT CONSIDERATION The following items are required to be submitted a minimum of 30 days prior to City Council meeting and payment of a $250.00 final plat review fee: Submit three (3) sets of full size, 50 scale construction plans and specifications for staff review and redline. • Utility plans shall show both plan view and profiles of all utilities (sanitary sewer, water and storm sewer lines). The plan view must show all drainage and utility easements. • Grading and drainage plans shall show dwelling type and elevations, wetlands and wetland buffer areas, stormwater pond NWL and HWL, EOF and catch basin and storm manhole numbers. • The construction plans and specifications shall be in accordance to the City's latest edition of Standard Specifications & Detail Plates. • The plans shall include traffic signage and street light placement. 2. Drainage calculations for water quantity and quality ponding with maps showing drainage areas for pre -and post -development conditions and contributing areas to catch basins. 3. Hydraulic calculations and drainage map for the storm sewer design. 4. Tree Preservation Easements (if applicable). 5. Trail Easements (if applicable). 6. Engineer's Cost Estimate of Improvements: a. Sanitary sewer system. b. Water system. c. Storm sewer drainage system including cleaning and maintenance. d. Streets, sidewalk and trails. e. Erosion control. f. Site restoration (seeding, sodding, etc.). g. Site grading h. Street lights & signs i. Engineering, surveying & inspection j. Landscaping 7. Five (5) sets (folded) of final plat, one (1) set of reductions (81/2" x 11"), and a digital copy in .tif format. 8. Digital copy of the legal description of the property in a .doc format. Lot tabulations. Failure to provide any of the above items by the required deadline will result in delaying consideration of final plat before the City Council. Updated 11-29-W g:\engVbrms\fimtl plat submittal.doc Chanhassen City CouncJkme 13, 2016 • 1c,0-v� All voted in favor and the motion carried unanimously with a vote of 4 to 0. VISITOR PRESENTATIONS. Mayor Laufenburger: I'd just make a comment that to all those of you that are in the chamber as well as may be watching at home, visitor presentation is a great opportunity for anyone to come to speak to the City Council. You are invited to speak on any topic again that's not on the agenda. We welcome comments about anything. Things that are going on in your neighborhood. Things that you want to complain about. Things that you want to reward the city staff about. Anything and visitor presentation is a great time to do that so at this time we'll move to our next item on the agenda which is new business. 1630 LAKE LUCY ROAD: APPROVE REZONING FROM RURAL RESIDENTIAL DISTRICT (RR) TO SINGLE FAMILY RESIDENTIAL DISTRICT (RSF). AND PRELID4IINARY PLAT WITH VARIANCES FOR A 12 LOT SUBDIVISION ON 8.96 ACRES OF PROPERTY LOCATED AT 1600 AND 1630 LAKE LUCY ROAD. APPLICANT: YOSEMITE HOLDINGS LLC. OWNER: ALMOND & CAROLYN KRUEGER AND CRAIG & DEANNA CLAYBAUGH. Mayor Laufenburger: Do we have a staff report? Kate Aanenson: Yes we do. Thank you Mayor, members of City Council. Mayor Laufenburger: Good evening Ms. Aanenson. Nice to have you here tonight. Kate Aanenson: Thank you. As you stated this application is for subdivision with some variances and a rezoning. Just to give you some background on this. This item did appear before the Planning Commission on their May 17`s meeting. Issues of concern that were brought by the Planning Commission and those speaking at the public hearing included grading, stormwater management and tree preservation. Specifically there was concern about water and the grading around Lots 6 through 9 and I'll address that a little bit more specifically. We've asked for a condition, or added a condition on that regarding that they not be walkouts but rather be lookouts that would help with that issue. In addition we note in here that there should be additional analysis on some of the issues raised at the Planning Commission which the applicants are working on. All those conditions are reflected in the staff report as we move to final plat. As a reminder all the conditions that are in this staff report are the marching orders that the applicant needs to resolve before this item comes back for final plat and typically those items, or that application for final plat would be on your consent agenda. So in addition besides the lots on the from full basement ramble type homes, we believe that will help reduce some of the excessive grading in those areas. We also believe that the stormwater management plan shall, is required to reduce and does accomplish the 90 percent for total suspension solids and 60 percent of the phosphorus using the industry accepted removal rates. In addition there was a lot of discussion on tree removal as in the City's policy and I'll go through that in a little bit more detail. Tree Chanhassen City Council 4-1une 13, 2016 • preservation opportunities. We want to make sure that we're not putting trees where they try to preserve trees where a homeowner will take them out in the future so we try to do an overall plan and I'll go through that in a little bit more detail. So there was a pretty robust discussion with the Planning Commission and the residents that attended that public hearing but the Planning Commission did recommend approval at that meeting so with that I'll go through a little bit more specifics on the project. So the project is located on Lake Lucy Road and Yosemite. It actually includes 3 parcels. Two of them owned by the Krueger's and one by the Claybaugh's. The Claybaugh's house goes back to 1961 so it's been there quite a while and seen a lot of change in the area as Mr. Claybaugh stated at the Planning Commission meeting. In addition the Krueger's have 2 parcels so it's a total of just under 9 acres of property. As stated in the staff report we always calculate net and gross density in a project so that'd be on the first page of your staff report but the gross density is 1.33 units an acre or net 1.88 units an acre so again very consistent with what we would see with a traditional subdivision. So the project does require rezoning from Rural Residential to Residential Single Family and I'd just like to take a couple of minutes to go through when we looked at for the zoning options on the property. Again when the property is zoned, guided low density there's different zoning options that you could put into place. You could do a PUD. You could do a low, a twin home project and so looking at the correct application for a zoning district the staff did an analysis of that and looking at again the 3 or 4 different types of zoning. The PUD requires preservation of significant natural features as does the residential low and medium density and you'll see that in an application next week. The low medium density or the twin homes so again looking at the surrounding neighborhood and what would be the appropriate land use recommendation for that we selected that and the applicant also went for the RSF which is our most traditional single family zoning application. So that requires a 15,000 square foot minimum lots which all these lots meet or exceed that and then would be a more traditional subdivision application. Mayor Laufenburger: So Ms. Aanenson 15,000 square feet that's 3 lots per acre, is that approximately correct? Kate Aanenson: Yes, yeah and so it's a little bit more than that with all the calculations, correct. Mayor Laufenburger: Yep. Kate Aanenson: So that would be the zoning. Again that is consistent with the Comprehensive Plan as required so we are recommending that again, so those two things are consistent. So then with the application itself we look at the preliminary plat once we've figured out the correct application for the zoning. So within the low density as I explained there's 12 lots being proposed and 1 outlot so in looking at those there are some challenges here and we talked about that here and I'll let the city engineer go through those in a little bit greater detail but this plan reflects the previous application. The applicant has been working towards to resolve some of these issues and well on their way to doing that but we like to stick with the application that went to the Planning Commission and those modifications just to make sure that we're not, it's kind of not a moving target so they've got clear direction on what they need to get to final plat but these 7 Chanhassen City Council June 13, 2016 • were the issues that were raised at the Planning Commission regarding drainage coming around these lots. Being pinched against this retaining wall and coming out so we believe we've resolved those issues. We've also pushed 11 and 12 to get a greater setback between the wetlands so this would be out of the preservation area up between this outlot on the north side of Lot 12. So the variances on here are for use of the flag lots. We have flag lots in other places in the city. For example a subdivision immediately to the east. There's flag lots in that. There are some other flag lots on Yosemite. We have done flag lots and they are permitted by city ordinance. One of the issues that comes up on the flag lots is when they're stacked. When you have someone's back to rear but these flag lots all have front facing lots. Have good access. They're not stacked in such a way that someone's, so you have two side yards here. There's not someone with the rear yard to the back. Because they all exceed the 15, you can see these are 18 and 19,000. The ones that would be the furthest back still felt that they met the intent and would support the variance for the flag lots on those applications. Mayor Laufenburger: Ms. Aanenson. Kate Aanenson: Yes. Mayor Laufenburger: Just for a second. Could you just, you're using a term that perhaps some people may not be familiar with. Kate Aanenson: Sure. Mayor Laufenburger: Can you just describe what does flag lot mean. Kate Aanenson: Yes thank you for that opportunity to clarify that. So typically a lot has to have 90 feet of frontage on a street. In this circumstance it meets the 90 feet of frontage at this point rather than at the street. So while that meets all those standards and this is included in, is not included in the lot area. The lot is significantly large enough but it just doesn't have the frontage on the public street. Mayor Laufenburger: So we use that definition to provide people with ample building footprint and yeah land for building. We use that term to describe the matter in which it can be built even though it doesn't have 90 feet of street frontage, is that correct? Kate Aanenson: Correct. Correct. Mayor Laufenburger: Okay. Kate Aanenson: So on page 18 of the staff report we go into details of the rational basis then for the variance. That it meets the criteria as stated in Section 18-22 of City Code so we believe that based on the development patterns in here, the 2 large wetlands and because the lots are all of standard size that we believe that it meets the intent and would support that variance. In addition Chanhassen City Council qune 13, 2016 • engineering had a variance on the location of the separation from Lake Lucy Road and the entrance to this. Certainly less desirable to have access off of Lake Lucy Road itself; a minor collector there or coming up through the wetland which would have been the other choice so there would have been greater impact. So based on that we just felt that the best location for the street to go into the property would be at this location again because it doesn't have the 300 foot separation that is also a variance which the staff is supporting. The grading, I'll let the city engineer take a few minutes to go through the grading and some of the stormwater issues. Mayor Laufenburger: Mr. Oehme. Paul Oehme: So thank you Mayor, City Council members. As Ms. Aanenson had indicated most of the development is going to he mass graded. 'There are most of the properties are going to be lookouts. A portion of the property does flow to the south. There is a culvert that runs under Lake Lucy Road to the south. That drainage area is being reduced from I think it was 3.7 acres down to 2.3 acres so one of the improvements that we're trying to make or things that we're trying to address is to try to at least match or reduce the amount of volumes and rates that go to the south as much as we can. The grades, we've worked with the developer on the grades in this development a lot. It is a tight site and a lot of topography out here to work with but I think the grading plan that we did come up with is the best that fits this site and meets the needs of the development. The grade is shown here again. The development is outlined up here. Like I said the culvert that does flow under Lake Lucy Road flows through a, kind of a wetland system down to Lake Lucy. There are some culverts through a driveway that have been impacted by some larger rain events in the past. That's why we're being mindful and receptive in trying to reduce the amount of volume and drainage that goes through this system as much as we can. The utilities in this area are being serviced by city sewer and water. The sewer is going to be extended across Yosemite Road. A section of sewer was recently put in with I think the Glaccum just to the east of here. The sewer is fairly shallow in some areas and we are anticipating that a few of the properties would have to have some sort of internal grinder system to facilitate the sewer to be discharged into the city system. However it's, the system or the plan being proposed is a lot better than just having a large lift station for the entire development. It's more cost effective to do it this way than to put in a large lift station. We also planning for potentially future development to the west here. There are I think 2 properties to the west of the proposed development that are currently unsewered at this time. If and when those properties were to develop or if their septic system fails they have another option to service their property, sewer their property through the city system. Water is being extended through Lake Lucy Road through our trunk main there so that's consistent with what has been approved in the comp plan. Let's see drainage I think, I'll just talk on drainage real quickly again too. So I briefly talked about we're trying to keep the rates and volumes to the south at or pre -development condition. The rest of the water drainage off the site from the roadway and from the front yards is going to be directed into a bioswale here along Lot 10 to be infiltrated and treated prior to discharging into the wetland so most of the treatment will be taking place in this area. We did get updated drainage calcs from the developer's engineer last Thursday I believe. We just haven't had time to run through all the calculations and review that information at this time but we anticipate L9 Chanhassen City Council• ne 13, 2016 • having a full review by the end of the week here. Most of the, so all the drainage off the back yards here from Lot 9 through 10, there's going to be discharge into this wetland here. I think there's some bioswales along this section of the wetland here that will be infiltrated. There is a culvert off the cul-de-sac that will also be handled with infiltration and rate control through a swale here as well. It's more or less a rain garden. There will be a new culvert on Lake Lucy Road that will be constructed as well. The one that's out there today is failing so with that if there's any other questions with utilities. Otherwise move on with the landscaping. Mayor Laufenburger: Can you just back up for a second? Mr. Oehme you use the term, you said I think I remember these numbers. You said you're reducing drainage from 3.7 to 2.3 is that right? Paul Oehme: Yeah 2.63. Mayor Laufenburger: 2.63? Paul Oehme: So it's about an acre's worth of decrease. Mayor Laufenburger: So and that, can you go back one slide? One more. Paul Oehme: There you go. Mayor Laufenburger: So what your impacting is the drainage that goes under Lake Lucy Road is that correct? Paul Oehme: That's correct, right. So we try to reduce as much of the drainage area going to the south as much as we can and redirect it into the city system here into the bioswale here and into the wetlands to be treated. Mayor Laufenburger: So the wetlands, that term bioswale, that water will go into the city stormwater, is that correct? Paul Oehme: Yeah so it would go into the storm sewer system that's in, underneath the street here and then be treated in this area here mainly. Mayor Laufenburger: Okay, alright. Thank you Mr. Oehme, now you can continue. Kate Aanenson: Again just to be clear that, so these was the recommendation that these be changed from walkouts to lookouts. Mayor Laufenburger: To lookouts. 10 Chanhassen City Council qune 13, 2016 • Kate Aanenson: Yep and that was a lot of discussion at the Planning Commission, these walls and then the force of the water here so those are some significant changes that had been recommended. Mayor Laufenburger: And Ms. Aanenson are those conditions? Kate Aanenson: They're conditions yes so when you see the final plat those changes will be made. Mayor Laufenburger: Okay, alright. Kate Aanenson: Yep. Again a lot of discussion was on regarding the landscaping. How many trees we placed on there. This plan as shown here does not meet the canopy coverage. The applicant will submit a plan to meet that. There was a lot of discussion. Could they get all I I I trees on this site. Whether that's plus or minus. The City does have a policy if you can't put them on site then you can bank those credits and then they would applied somewhere else. Somewhere else in the area so that's the other option so that will all be worked out as a part of this development. Mayor Laufenburger: Again that's a condition right? Kate Aanenson: That is a condition of approval, correct. So again they need to put additional buffering in there and canopy coverage and so there's a mechanism to handle that if, there was a lot of discussion on whether or not that many can be placed on. I also want to clarify or just reiterate a couple other things that you know we do require 25 or maximum 25 percent hard cover. The building plans, pads that are shown on here are maximum showing the setback area so that doesn't mean every house is going to be that large and so typically what we ask for is a 60 by 60. These are larger. I think they're like 70 by 70 or 70 by so significant. They're showing the setback area so they still have to meet the 25 percent. That doesn't mean these can be, the houses will be as big as this square. It's just illustratively showing where the house can be placed within that square if that makes sense. Mayor Laufenburger: So Ms, Aanenson I'm glad you brought that up, the 25 percent. So if, if the footprints of the buildings were built as they're shown does this entire area meet 25 percent? The hard surface. Kate Aanenson: Yeah I haven't calculated that because it depends on what the house will come in. I doubt that it would, it might be close yeah. Yeah so we check each house plan that comes in. We would check the setbacks and we also check the hard cover calculations for each lot. Mayor Laufenburger: So every lot has to meet that 25 percent? Kate Aanenson: Every lot has to meet that one. 11 F Chanhassen City Council•June 13, 2016 • Mayor Laufenburger: So if one lot is 24 the additional 1 percent can't balance over into the other neighbor? Kate Aanenson: That's correct. Mayor Laufenburger: Okay. Councilwoman Tjornhom I think you were about to ask something. Councilwoman Tjornhom: I have, yeah I need to go back and when you talk about the total number of trees to be planted, the 111. 66 showing. I'm having a hard time figuring out, they need to plant I I I trees. Why is it 11 I? Why is that magic number? Kate Aanenson: Sure, yep. So the calculation is based on the upland area which is 7.3 acres and they have a baseline canopy which is about 65 percent of the area. It's got currently has canopy cover so the way our ordinance works is you have to maintain a percentage of that. It's assumed that with any developments some trees are going to be removed so if there's a significant portion of those removed then you'll have to replace it that much so the minimum canopy coverage required is 46 percent and they're proposing a 14 percent coverage so in the staff report on page 15 the detail by the City Forester outlines what the difference would be and that would be calculated by a percentage of square footage or caliper and that would equate to approximately 66 additional trees that would need to be shown. Or 66 are shown and they need I I I so again going back to again the Planning Commission got into a lot of detail on this too. Again the house plan might not be that big. There could be room for other trees on there or if it doesn't make sense there then we would bank some of those but again there'll be some additional trees up in this area for, we look at some of the extraction for some of the wetland there too so. Councilwoman Tjornhom: Because I guess I'm just having a hard time with the fact that you know our ordinance states, our City Forester has arranged or calculated that you know I I I trees should be planted there or. Kate Aanenson: Sure. Councilwoman Tjornhom: But if they can't do it and they can only put 66 in, I guess I'm having a hard time figuring out why they still have to buy the extra 30, whatever it would be trees. Kate Aanenson: Because they're taking that many down. It's the removal, yeah. It's the removal of the existing tree canopy and I think that was one of the issues that the neighbors had so, that they were concerned about so many trees going down because right now part of those lots are heavily wooded so they're tried to make that up so again following ordinance calculations that's how we do it. Mayor Laufenburger: Mr. Gerhardt did you want to say something? 12 Chanhassen City Councilqune 13, 2016 • Todd Gerhardt: No. Kate I think covered it. It's based on ordinance is how the calculation is drawn up. We do a tree inventory of all the existing trees and based on that inventory and the percentages in the ordinance it came up to be 111. We will work with the applicant to find another spot to plant the other 35. Councilwoman Tjornhom: But it won't be on this property. Kate Aanenson: It may not be. Again they need to do some revision to their landscaping plan. They are working on that right now. Again so some of their buffer requirements are along Lake Lucy. Some buffer requirements there. There's overstory/understory trees so it depends on the mix so. Councilwoman Tjornhom: Because well I understand that. I just would hate to make a developer go through extra expense of buying and planting more trees elsewhere if it just was impossible for him to follow the ordinance and our calculations. Kate Aanenson: Right and I think our goal is to make this a good project that meets some of the concerns that the neighbor had of getting reforestation back and following the city code so understand your point. Another thing I didn't cover while I think about it now. In the Planning Commission or the council update, the beginning we did have some additional attachments. The letters. I just want to make sure that the letters from Mr. and Mrs. Weingart and from Mrs. Randall and then some of the staff comments. The applicant's comments back and then I handed out to you tonight a letter from Mr. McCourt and then a phone conversation with Cathy Lam. Some of the concerns that they had. Again. Mayor Laufenburger: And Ms. Aanenson. Kate Aanenson: If you wanted me to address any of those I could do that now. Mayor Laufenburger: Yeah did any of these most recent comments, did they introduce things that were not discussed at the Planning Commission? Or was it a reaffirmation? Kate Aanenson: I think most of them, you know I think some of the comments from the Planning Commission meeting was as we know infill development. Change. Mayor Laufenburger: Yeah. Kate Aanenson: We talked about again I've been here 25 years. There's been a lot of development along Lake Lucy Road over the years. Shadowmere. Willow Ridge. Some of those projects have come in. It changes. These are 2 larger lots. I think the water quality issues certainly and the notification of a hearing notice that we always try to put a sign up. That one we didn't hear before. And then flyers, 350 feet is the state law. We do 500 feet and I think this applicant or this person sent it, a letter was over 1,000 feet away so we do our best. 13 Chanhassen City Council lune 13, 2016 • Mayor Laufenburger: Okay. And in many cases we exceed what's required is that correct Ms. Aanenson? Kate Aanenson: Absolutely, yes. Yes. Mayor Laufenburger: Okay, alrigbt. Continue with your presentation. Kate Aanenson: Sure, yep. So landscaping is still in the works and then finally this park, the Project is next to Pheasant Hill Park so we certainly wanted the applicant to find a way to integrate to the park. We know a lot of people walk along Lake Lucy. Dog walk and going to the Pheasant Hill Park so this is the applicant's drawing of a connection to the park. You can see this trail coming out into the park and that gets interpreted as you look at this connection here coming through and then we'll have a sidewalk along this street and then a connection back down to Lake Lucy Road. Again allowing people to walk down there to get to the bus stop and the like, or to use the trail to get to the park. A loop for other people in the neighborhood to use this and make their way around that. Mayor Laufenburger: Ms. Aanenson does that then become an easement for that trail or not? Kate Aanenson: It's a sidewalk and then this would be a trail easement I believe. Yeah, the rest of it would be sidewalk. Public. Mayor Laufenburger: Okay. Kate Aanenson: So with that the Planning Commission recommended to the City Council that you rezone the property from Rural Residential and then approve the preliminary plats and then also the variances for the flag lots and the cul-de-sac bubble and the 300 feet and then with the conditions of approval and adopts the Findings of Fact. With that I'd be happy to answer any questions that you may have. Mayor Laufenburger: Alright, are you going to leave this motion up here for just a second Ms. Aanenson? Kate Aanenson: Absolutely. Mayor Laufenburger: Alright. In just a moment I'm going to ask the applicant to come forward if you'd like, he or she would like to say anything but before we do that are there any questions of council for staff? Councilwoman Tjornhom. Councilwoman Tjornhom: I'm going to go back to landscaping again. It just, it's bothering me so I need to understand it more. That's 45 extra trees if I did my math right that we're going to make the applicant purchase and plant elsewhere. Is that correct? 14 Chanhassen City Council�une 13, 2016 • Kate Aanenson: Okay first of all I think we need to note that we did calculations and since that time there's been revisions to the grading plan, some of the site plan so we're saying that they've not been reflected in the tree preservation so we're asking them that they need to resubmit their calculations and we'll review that and compare that to the city ordinance. We're not asking, they're not asking for relief from the ordinance nor are we granting relief from the tree preservation ordinance. We're treating this project like we've treated everyone and the City's policy in the ordinance says if they can't replace them all on site, then they would bank those trees. That number, whatever that equates to and caliper to the City and whether we put it somewhere else along that streetscape or find somewhere else in the park, something like that is how we would use those. Councilwoman Tjornhom: And so, and is that then I mean because we have categories of trees, shrubs and. Kate Aanenson: Correct. Councilwoman Tjornhom: So is that actual trees or would that be a mix? I mean. Kate Aanenson: It's a mix. It's a mix. Councilwoman Tjornhom: It seems like a huge expense that they can't invest into their development. Kate Aanenson: Sure and all I can say at this point is you'll have that opportunity to look at that at final plat because I think we're looking through those revisions so I would just hold that in abeyance until we see that at final plat and have a better idea of what those actual numbers are and how they're going to manage that, if that's acceptable. Mayor Laufenburger: Did you have another question councilwoman? Councilwoman Tjornhom: Tbat's it. Mayor Laufenburger: Mr. Campion you have a question, comment? Councilman Campion: Ms. Aanenson can you talk a little bit more about the variance request for the flag lots? Kate Aanenson: Sure. Councilman Campion: We have an ordinance for flag lots right? Kate Aanenson: Yes we do. 15 Chanhassen City Counci•une 13, 2016 • Councilman Campion: So then the necessity for the variance is what again? Kate Aanenson: Well it's pinched by the shape of the lot. The 2 wetlands here and because all of the lots are in well excess of 15,000 square feet. It wasn't like they were right at 15, 15, 15. It's just the shape of that. Trying to get this cul-de-sac to pinch. You can see these lots are deeper too so it's, if you look at Shadowmere, that subdivision... the site, I mean they also used flag lots and there's some other ones up on Yosemite too. We do allow flag lots via variance. The reason we changed it, it used to be standard that we could do it. We changed it to variance because the issue became when you have a, sometimes you see a flag lot with a lot in front and then a long driveway going behind and sometimes that's less desirable for the neighbors behind because they don't have the same orientation in the back so if you have a long deep lot and you want to split the back half of it, those became problematic. We saw this because they're all getting access from the same street, the same bubble and it doesn't have that same negative impact so we felt that we could support the variances on these. Councilman Campion: Okay. Mayor Laufenburger: And related to that Ms. Aanenson it appears that Lots 9 and 10 will share a common driveway until it comes to their property. Kate Aanenson: Correct. Mayor Laufenburger: Is that correct? Does that make sense? Kate Aanenson: (Yes). Mayor Laufenburger: Okay, alright. And the developer's clearly aware of the requirements of the flag lots? Kate Aanenson: That's correct. Mayor Laufenburger: Okay, alright. Any other question of staff? Okay. Is the applicant present and would you like to address the council? State your name and address please for the record. Terry Forbord: Mr. Mayor, members of the City Council, my name is Terry Forbord with Forbord Land Company. I'm a principle with Yosemite Holdings and it's a privilege to be before you this evening. We're very grateful for the extra effort that the staff has exhibited in this very challenging exercise of trying to find the best possible development scenario for an infill piece of property within the city and they've done an excellent job. We support their recommendations. In the, due to my respect of your time and your agenda we can be as extensive with the presentation this evening on my background. Roger Humphrey my senior 16 Chanhassen City Council Tune 13, 2016 is engineer is here to answer any questions but out of respect for your time rather than bore you with a history about my work in Chanhassen I'd prefer to leave that question to you. I would like to thank you for recognizing Senator Ortman. I've known her for a long time too and she's done a great service to this community and the state. I have had a privilege of developing 6 communities in Chanhassen. All of them occurred during the 90's and early 2000's. That would have been Longacres, Willow Ridge, Springfield, Highlands at Lake St. Joe. I directed development at Near Mountain and it was a privilege working with the City then and it is today. Mayor Laufenburger: Your thumbprint is everywhere Mr. Forbord. Terry Forbord: Well. Mayor Laufenburger: Well not everywhere but substantial. Terry Forbord: It's very important to make sure that people understand is that I had an incredible team of people working with me. It wasn't just me but it was a real privilege to build these wonderful neighborhood communities in Chanhassen and it's fun to be back here again. But we're here to answer any questions that you might have about this so please feel free to raise anything. Mayor Laufenburger: Okay, anybody have a question for the applicant? I do Mr. Forbord. Are you familiar with the conditions that City staff is putting on the development? Terry Forbord: Absolutely. Mayor Laufenburger: And are you prepared to comply with all of those conditions? Terry Forbord: Yes we are working with them. Since the Planning Commission we've been working daily with the City on each and every one of those things including the trees. The site plan, as Community Development Director Aanenson mentioned has, this is the original submittal and we've been going through some reiterations to make it better since then and the tree planting and everything ultimately then will change as well and we know that those are conditions of this, of the final plat and so we're fully prepared to do that. Mayor Laufenburger: Okay. Alright. Thank you Mr. Forbord and Mr. Humphrey for being with us tonight. Thank you for making yourself available. Terry Forbord: Thank you. Mayor Laufenburger: Ms. Aanenson let's come back to you for just one question. Can you bring the motion up please? So I've heard you say, we'll get it there. Kate Aanenson: Sony. 17 Chanhassen City Council une 13, 2016 Mayor Laufenburger: That's okay, I'll be patient. Kate Aanenson: I remember we had a mouse there. Mayor Laufenburger: 'There. So I heard you say that in some form a few times that we're working towards getting to that condition and you use the terms that it will come before us in the final plat. So if we were to move forward with approving this tonight this item will come back to us again is that correct? Kate Aanenson: That's correct. Mayor Laufenburger: Can you explain to, especially to those people that are with us this evening, what does that mean? We're giving approval for a next step but what does the council, what authority does the council have at the final plat approval? Kate Aanenson: Well your authority lies in the conditions that you put in there. They have to show that they've met all those conditions and there's a pretty lengthy list. As the applicant has stated they're working on those right now. We've been seeing those back and forth so they have to meet all those conditions. Mayor Laufenburger: Okay. And this is very customary for us in developments like this is that correct? Kate Aanenson: That's correct. Mayor Laufenburger: Okay, that we see a preliminary plat and it's that time that the council hears about conditions that have been stipulated. Not necessarily met but will be met at the time of the final plat. Kate Aanenson: That's correct. Mayor Laufenburger: Okay, ahight. With that said is there any comment or any questions or comment from the council? Anybody. Is there anybody that would like to make a motion? Todd Gerhardt: Mayor do you want to...? Mayor Laufenburger: Oh excuse me. Thank you Mr. Gerhardt. Thanks for the reminder. I mentioned earlier in the meeting that all members of the council were present with exception of Councilwoman Ryan. She has asked me to read this letter in her absence and I'll read it word for word. Dear Chanhassen residents and neighbors. I've asked the Mayor to read this letter on my behalf. I deeply regret that I am unable to attend tonight's meeting but unfortunately I have been struggling with some health issues this past week which caused me to spend some time in the 1E Chanhassen City Council Tune 13, 2016 • hospital. I am hopeful and optimistic for a full recovery. The Lake Lucy Road subdivision proposal is one that has been a topic of much discussion. Like all proposals this is an important one but it's also one that directly impacts my surrounding neighbors. Please know that my concerns have been expressed and noted and I know your emails, your calls and conversations will also be taken into careful consideration when the City Council makes it's decision this evening. To all residents please continue to reach out to council with questions, comments and concerns as it is a very important part of the process. Again my apologies to you for my absence in representing your voices tonight. Councilwoman Elise Ryan. And I would just simply echo what Councilwoman Ryan said in her note that this proposal has been in front of the council for a number of days now and we anticipated it's coming forward so we have reviewed Planning Commission comments. We have reviewed correspondence. We have reviewed comments from citizens given both personally, face to face. Phone calls. Emails, et cetera so we have considered all of this and we also consider the importance of the conditions that are stipulated in the proposal as well. So with that is there anyone that would like to make a motion? Councilman McDonald: Mr. Mayor I have a question. So the motion that's up is not the motion that's in the packet. Which motion do you want to use? This is from the Planning Commission. The one in the packet is for. Todd Gerhardt: Kate? The City Council motion. The one up on the screen for Planning Commission. Kate Aanenson: It says, oh okay. Sorry. Just take this off. Councilman McDonald: Okay. Kate Aanenson: You can take the Planning Commission word off, yeah. Councilman McDonald: Well it's a little bit different also. It talks about the bubble lot or the bubble circle. Kate Aanenson: Yeah you can read the motion in the packet. It covers all the conditions of approval plus adoption of Findings of Fact. Mayor Laufenburger: Okay for those present in the council, can you go back to the Planning Commission motion just for a second. Kate Aanenson: It reads the same. The problem is that this is in here. This is correct. Mayor Laufenburger: Okay, this is the right motion that's on the screen right now Mr. McDonald. Councilman McDonald: Well then I guess I'll make a motion. 19 Chanhassen City Council 13, 2016 • Mayor Laufenburger: Councilman McDonald. Councilman McDonald: I make a motion that the Chanhassen City Council approve rezoning of the property from Rural Residential (RR) to a Single Family Residential (RSF) and preliminary plat approval for 12 lots, one outlot and public right-of-way with variances for the use of flag lots, cul-de-sac bubble size and a local street centerline offset of less than 300 feet and a building setback variance from the cul-de-sac bubble for Lot 11 subject to the conditions of approval and adopts the Findings of Fact and Recommendation. Mayor Laufenburger: Thank you Mr. McDonald. Is there a second? Councilman Campion: Second. Mayor Laufenburger: Thank you Mr. Campion. Is there any fi -ther discussion? Before this goes for a vote, Ms. Aanenson when do you expect final plat to come forward? Kate Aanenson: We'd have to ask the applicant. Mayor Laufenburger: Mr. Forbord do you want to speak to that question? Terry Forbord: Mr. Mayor, members of the City Council, Terry Forbord. We plan to produce that final plat as quickly as possible and have it before the City within the next hopefully 30 days. Mayor Laufenburger: Okay. Terry Forbord: The construction season is very short in Minnesota so. Mayor Laufenburger: We understand that. Thank you very much. Terry Forbord: Thank you. Mayor Laufenburger: Okay any other discussion? Councilman McDonald moved, Councilman Campion seconded that the Chanhassen City Council approve rezoning of the property from Rural Residential (RR) to a Single Family Residential (RSF) and preliminary plat for 12 lots, one outlot and public right-of-way with variances for the use of flag lots, cul-de-sac bubble size, a local street centerline offset of less than 300 feet and a building setback variance from the cul-de-sac bubble for Lot 11, plans prepared by Stantec, dated 5/6/2016, subject to the following conditions and adopts the Findings of Fact and Recommendation: 20 Chanhassen City Council Tune 13, 2016 • Building: 1. Provide a 1:200 "clean" plat drawing. 2. Demolition permits required for the removal of any existing structures. 3. Buildings may be required to be designed by an architect and/or engineer as determined by the Building Official. 4. A final grading plan and soils report must be submitted to the Inspections Division before permits can be issued. 5. Retaining walls over four feet high require a permit and must be designed by a professional engineer. 6. Each lot must be provided with separate sewer and water services. 7. The applicant and or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. Engineering: 1. The applicant shall include a chart with the maximum hardcover allowed on each lot. 2. The lots shall be graded to drain away from proposed building locations. 3. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: Lot 6 backyard, Lot 7 backyard, the east side of Lot 1, the highpoint of the side yard of Lot 10. 4. The applicant shall revise lots 6-9 be a full -basement, rambler -style home. 5. The grading plan shall be revised to show a spot elevation at the centerline of each driveway where it meets Street A. 6. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9. The applicant shall identify the discharge point of the culvert shown on the existing topography near the existing driveway of 1600 Lake Lucy Road. If it is a driveway culvert, the applicant shall have it removed or bulkhead and abandoned. 8. The plans shall identify the areas intended for stockpiling materials on site during construction. 21 Chanhassen City Councilune 13, 2016 9. Top and bottom wall elevations shall be shown for the retaining wall on the eastern property line of Lot 9. 10. Any retaining wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA). 11. The development plans shall call out the material of the retaining wall. The following materials are prohibited for retaining wall construction: smooth face, poured in place concrete (stamped or patterned is acceptable), masonry, railroad ties and timber. 12. Boulder walls shall not be taller than six feet. 13. The applicant shall have their surveyor confirm all easements and right of way shown with a recent title survey before final plat. 14. Easements over drainage swales, basins and storm water pipes shall be called out as "Drainage and Utility" easements. 15. Retaining walls and an entry monument are proposed within City easements. 'These elements shall be relocated outside of the standard perimeter drainage and utility easement boundaries, expecting the retaining wall on Lots 5 and 6. 16. The retaining wall on Lots 5 and 6 requires an encroachment agreement. 17. The preliminary plat shows a signage easement on Lot 1. This shall be a paper easement between Lot 1 and the development's HOA. 18. The applicant shall name Street A with coordination with the Fire Marshall prior to submittal for final plat review. 19. The applicant shall include the horizontal alignment tabulation for Street A in the plans. 20. The developer shall show construction limits for utility work below Yosemite Ave and submit a staging and restoration plan with their final plat submittal. 21. A street light shall be installed at the intersection of Street A and Yosemite Avenue. 22. Driveways shall be shown on the plan in the final plat submittal. 23. Driveways shall be designed to meet all standards in City Code §20-1122. 22 Chanhassen City Council Ike 13, 2016 • 24. The sidewalk does not continue north of Street A, therefore the pedestrian ramp shall not be constructed at the intersection of Street A and Yosemite Avenue. 25. The pedestrian ramp on the northwest comer of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. 26. The sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. T 27. The portion of the sanitary services that lies within the right-of-way shall be gravity -flowing. 28. The sanitary sewer/water main crossing on Lot I may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 29. SMH 5 shall be moved to be centered between the building pads for Lots 5 and 6. 30. The sanitary services within the cul-de-sac bubble shall be revised to eliminate bends and cleanouts within the right-of-way. 31. The utility plan sheet shall be revised to call out the City of Chanhassen as the local authority in Note 13. 32. The plans shall call out C900 material for the water main pipe. 33. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 34. Two additional hydrants shall be installed, one at the intersection of Street A and Yosemite Avenue and one at Station 3+00 of Street A. 35. Water and sewer partial hook-ups are due at the time of final plat. The partial hook-up fees will be assessed at the rate in effect at that time. Environmental Resources: 1. A revised tree preservation plan and calculations must be submitted to the city prior to final approval. 2. All required plantings must be located on private property outside of public right-of-way. The landscape plan shall be changed to reflect this requirement. 3. Ash trees shall be removed within the proposed tree preservation area. Removals shall be directed by the city. 4. A revised landscape plan with a detailed plant schedule listing quantities for each individual species shall be submitted to the city before final approval. 23 Chanhassen City Council • ne 13, 2016 • 5. The proposed tree preservation area in the northeast comer of the development shall be incorporated into outlot including wetlands. Fire: 1. Proposed street name will be submitted by the applicant to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval. 2. Two addition fire hydrants will be required: one at the south/west comer of Yosemite and Street "A" and the second one on the south side of street "A" by Sta.3+00. 3. A three-foot clear space shall be maintained around fire hydrants. 4. Street sign(s) (temporary allowed) shall be installed prior to building permits being issued. Fire Marshal must approve signage. 5. Prior to combustible home construction fire apparatus access roads capable of supporting the weight of fire apparatus shall be made serviceable. 6. An addition address number will be required for lot #9. Its location shall be at the entrance of the private driveway. Sign location and size must be approved by the Fire Marshal. 7. Prior to combustible construction fire hydrants shall be made serviceable. 8. No burning permits will be issued for tree/ brush removal. Parks: 1. Full park dedication fees for 10 lots shall be collected per city ordinance in lieu of requiring parkland dedication. 2. Dedication of a 20-foot wide trail and a utility and drainage easement between lot 7 and lot 8. 3. Planning, engineering, and construction per city standards of an 8-foot wide bituminous trail within this easement connecting public Street "A" and Pheasant Hill Park. 4. Relocation of the public sidewalk to the south side of Street "A". Planning 1. The front lot lines for lots 5 shall be the north property line, for lots 8 and 9 the east lot lines. 24 Chanhassen City Council-une 13, 2016 • 2. The entry monument may not be located within the right-of-way and must be located outside of the sight triangle. A sign easement shall be dedicated where the monument sign will be located. Water Resources: I . Runoff rates and volumes cannot be increased to the south. 2. Curve numbers and drainage areas shall accurately reflect pre and post -construction conditions. 3. The stormwater management practices shall achieve a new overall reduction of at least 90% for total suspended solids and 60% for total phosphorous using industry accepted removal rates. This includes manipulation of the NURP50 Particle Distribution filtration efficiencies to match accepted literature values. 4. The sump manhole and SAFL Baffle shall not be included in the P8 model as the P8 model already assumes pretreatment. 5. All sumps with SAFL baffles shall be a minimum of 3 feet in depth. 6. The applicant shall prepare and submit a Surface Water Pollution Prevention Plan that contains all required elements from Parts III and IV of the NPDES/SDS Construction Permit. This shall be a standalone document. 7. Any disturbance of the buffer areas shall be restored with native vegetation appropriate to the area and the plans shall note this and the seed mix to be used. 8. A plan shall be prepared showing the placement of wetland buffer monuments. 9. All buffer monuments shall be installed prior to the sale of any lots. 10. All stormwater practices shall be place into a drainage and utility easement if not included in an outlot. 11. All drainage swales shall be included in drainage and utility easements and the development shall make any future builder and homeowner aware that these may not be altered without submittal of a revised grading plan to the city and subsequent approval of that revised plan. 12. The development contract shall include language indicating that the Homeowners' Association shall be responsible for any landscaping work associated with the biofiltration feature and the city shall maintain the associated infrastructure including the underdrain, the filtration media and the piped storm sewer conveyance system. 13. The south biofiltration feature shall have a skimmer emergency overflow structure designed and installed. 25 Chanhassen City Councill—Rune 13, 2016 • 14. A detailed plan of the filtration basins, consistent with the MN Stormwater Manual shall be submitted with the final plat submittal for review and approval by city staff. It shall include, at a minimum, a plan view, a profile view, all necessary elevations, any in situ soil preparation, methodologies to be employed to protect from construction traffic, soil filter media specifications, any plantings and any appurtenant work to be done. 15. Underdrains and drain tile shall have tracer wire and cleanouts. 16. Pretreatment shall be required for all filtration basins receiving piped discharge. 17. A forebay, surge basin or other approved energy dissipation device shall be provided for the inlet into the biofiltration feature included in the outlot. The selected practice must not create undue maintenance burdens. The end result shall be non -erosive velocities into the basin. 18. Efforts shall be made to raise the elevations of Lots 2 through 5 to assure positive flow towards the street and ultimately to the treatment devices. 19. The applicant, their consultant and city staff shall collaborate to minimize drainage concerns in the back and side yards of lots 6 through 10. 20. Storm Water Utility Connection charges due at the final plat are estimated to be $58,880.00. All voted in favor and the motion carried unanimously with a vote of 4 to 0. Mayor Laufenburger: Thank you very much Ms. Aanenson, Mr. Oehme and Mr. Forbord. Terry Forbord: Thank you very much. Mayor Laufenburger: Thank you. 4060 LAKERIDGE ROAD: APPROVE WETLAND ALTERATION PERMIT TO BUILD A TEMPORARY DOCK ON PROPERTY ZONED SINGLE FAMILY RESIDENTIAL (RSF). Mayor Laufenburger: Do we have a staff report? Krista Spreiter: Yes. Thank you Mr. Mayor. As stated this is a request for a wetland alteration permit at 4060 Lakeridge Road. Mayor Laufenburger: And just for the record, for those in the chamber could you state your name. Krista Spreiter: Krista Spreiter, Natural Resources Technician. Mayor Laufenburger: Thank you Krista. PTI 1�-o9 CHANHASSEN PLANNING COMMISSION REGULAR MEETING MAY 17, 2016 Chairman Aller called the meeting to order at 7:00 p.m. MEMBERS PRESENT: Andrew Aller, John Tietz, Nancy Madsen, Steve Weick, Lisa Hokkanen, and Maryam Yusuf MEMBERS ABSENT: Mark Undestad STAFF PRESENT: Kate Aanenson, Community Development Director; Bob Generous, Senior Planner; Alyson Fauske, Assistant City Engineer; and Krista Spreiter, Natural Resources Technician PUBLIC HEARING: 1630 LAKE LUCY ROAD: REZONING FROM RURAL RESIDENTIAL DISTRICT (RR) TO SINGLE FAMILY RESIDENTIAL DISTRICT (RSF). AND PRELIMINARY PLAT WITH VARIANCES FOR A 12 LOT SUBDIVISION ON 8.96 ACRES OF PROPERTY LOCATED AT 1600 AND 1630 LAKE LUCY ROAD. APPLICANT: YOSEMITE HOLDINGS LLC. OWNER: ALMOND & CAROLYN KRUEGER AND CRAIG & DEANNA CLAYBAUGH. Aller: For the record we have received several items to add to that package. One is a email from Renee Schubbe. A second from Alan and Mary Weingart and a third was a response to the staff recommendations to the preliminary plat filing by the respondent or the applicant and those items will be part of the package which goes to the City Council. We've had an opportunity, a brief opportunity to read it. My expectation would be that the developer will also review his responses to the recommendations when they have the opportunity to speak so with that we'll open up the hearing. Generous: Thank you Chairman Aller, commissioners. Planning Case 2016-09, Lake Lucy Road Subdivision. This is a public hearing. The applicant is Yosemite Holding Limited Liability Company. They're requesting a rezoning of the property from rural residential district to single family residential district and a preliminary plat approval review with variances and we'll go through those in conjunction with the subdivision. The property is located at the northwest comer of Lake Lucy Road and Yosemite Avenue. It consists of 3 properties or 3 parcels. Two are owned by the Krueger's and the other is by Claybaugh. Again these properties are currently zoned rural residential. They have 2 single family homes on the 3 properties. The total site is 8.96 acres. The property is guided in the Comprehensive Plan for residential low density uses. What this means is that densities of 1.2 to 4 units per acre are permitted on it and it all depends on the type of zoning that they are given that they determine the final outcome of that development. Rezoning from rural residential to single family residential and preliminary plat Chanhassen Planning Commission — May 17, 2016 with variances. The request, in looking at the rezoning of the property we had to determine which zoning categories are consistent with the residential low density land use designation. Single family residential is a primary zoning category that the City uses on residential low density properties in the community. Approximately 85 percent of our lands that are guided for low density are ultimately rezoned to RSF. A second zoning category that could be appropriate would be mixed low density residential. The R-4 district. This district permits both single family homes and twin homes on the development. Again this is a single family development so staff believes that that wasn't the appropriate zoning in this instance. The next consistent zoning would be low and medium density residential or RLM. Now this permits single family or attached housing. The one caveat we had in the RLM district is that the developer is to maintain a significant area of upland as common open space. In this instance we don't have that characteristic of the development. While they're preserving the northeast comer of the site it's mostly because of the wetlands that sort of restricted development of that part of the property. And finally a planned unit development residential would be consistent with the residential low density land use. However in that instance we're looking for either the provision of affordable housing or housing types that cannot be developed outside of a planned development and in this case they can meet all the requirements of the RSF district and so staff is recommending approval of the rezoning to RSF which is consistent with the land use designation. The proposed subdivision of the property would create 12 single family lots and 1 outlot which would contain the 2 wetlands and the preserved wooded area in the northeast corner of the development. Currently they designate Street A as the public street providing access into the development. And then this Street A would connect into Yosemite which is a collector roadway under the City's hierarchy of road systems. Lake Lucy Road is an arterial road and it's a road we're trying to take local access off of so that's part of the variance request is one of the reasons that we're looking at that. The 12 lots all exceed the minimum requirement for single family residential development. They are proposing the use of 3 neck lots. At one time neck lots were a permitted category or design standard. In the, I believe it's the late 90's the City amended the ordinance to make it a variance. We did this so that we could look at requiring specific orientation of structures so you didn't have people's front yards looking into rear yards or whatever the concern may be. Also we can limit size of driveways as part of that and the neck lots so that we can control the amount of impervious surface within the development. It also allows for consistent development patterns within a development. The right-of-way, yeah and these are the 3 neck lots within it. All the rest of them have the full minimum frontage on the public street. The variances requested in conjunction with the subdivision are for the use of the flag lots. The 3 that they're proposing. To have a cul-de-sac bubble less than the 60 foot radius and this is for Lot 11. You see how the cul-de-sac is offset to the east and because we have the full width it really cuts into this Lot 11 and if we're able to move that over farther we believe we can improve the stormwater capability of the stormwater pond which is located on the east side of the development. The other variance would be for setback from that right-of-way from, only from the cul-de-sac bubble for Lot 11 so in essence we'd be picking up 20 feet of buildable area in this area which would allow them to shift this over and this house over and potentially get more of this outlot area or green, easement area on the east side of Lot 12. The next one is for the 300 foot offset between street right-of-ways. In reviewing this development when it initially came in 2 Chanhassen Planning Commission —May 17, 2016 we looked at 3 different access points. One would come off of Lake Lucy Road which is an arterial roadway. The other was to push it farther north and come in between the wetlands. However we ruled out this consideration because it could have very negative impacts on both the wetlands on the property and would eliminate the preservation of the only viable wooded area that we had on the site. Finally because of the wetland this access location is forced south so we could not meet the 300 foot separation on Yosemite. And again if we had gone off of Lake Lucy Road that's an arterial. We're trying to remove access from directly from that so. Staff believes that this 300 foot offset. We did have the application do a queuing study to see if there's any back up issues for traffic that would make left turns into the development and there should not be. There's sufficient distance between the two. And I've already hit the building setback on, just on Lot I 1 from the cul-de-sac bulb. They would still need to maintain the 30 foot setback from the rest of the street right-of-way so this building line remains the same. This is the one that comes over approximately 20 feet and so staff is recommending approval of the subdivision with variances. And then we're going to tag team this and Alyson will address the infrastructure and grading issues on the project. Fauske: Thank you Bob. When the applicant first came to staff with the proposal for this development the driving factor, one of the driving factors for the design of the site was the sanitary sewer design. Sanitary sewer for this site is being extended from the Glaccum subdivision which is just to the east of this property. As you may recall it's, it was approved last year and they brought sewer in from across Lake Lucy Road to the Glaccum subdivision. Extended it to the west and under this proposal the applicant proposes to extend the sewer from that location within the Glaccum subdivision to their site. The challenge with that being is even though the sanitary sewer with the Glaccum subdivision was set as low as possible, it still it was not low enough to serve all of this site so the developer's engineer had a challenge in designing the site in order to try to get the sanitary sewer to service the lots and in fact in the staff report we've indicated that the sanitary sewer is actually shallower than we usually see it in order to try to get service to these lots so we've been working with the applicant. That was, like I said that was a driving factor on the site. One of the design considerations for this site. In conversations with the applicant's engineer as well when they were looking at the grading of this site, one of the desires of the developer was to balance the earthwork on this site meaning that they wanted to limit the amount of fill that would be brought into the site. I'll let them speak a little more to that if you have questions with regards to that but that was something that they had indicated to staff as well as far as trying to build the site up to get the gravity sewer as well as we've had some discussions with some of the building styles in particular over on the west side of the site. Lots 6 through 9. When we look at this the trail connection is high and then the grades dive down with drainage going to the back of the Lots 6 and 7, as well as here over on Lots 8 and 9. We had some conversations about that area. If there was an ability to alter that so that we could get a more level back yard and again I'll let the developer speak to that as far as what their constraints were with bringing that portion of the site up. And most of the grading, the grading portion of the staff report covers mostly pages 6, 8 and 9 of the staff report for those who may be following. As staff mentioned in the staff report, and just to what I had just touched on previously when staff looks at these drainage patterns here in the back yard they are close to the 3 Chanhassen Planning Commission — May 17, 2016 proposed building pad. Again the developer has indicated that the building pads shown on these sites are oversized. That the actual home styles would not utilize all of the building pad here. We understand that. We'd like to make mention of it though. Just as go through this process just to have it, just to have it out there as a concern. It's not, it doesn't make the lot unbuildable but with the drainage swale depending on how they place the home on the property utilizing that building pad that we've had feedback from residents when their back yard is encumbered by an easement. That's a concern for them because it limits what they can do to some extent in the back yard, as well as with the grades as well as any permanent structures within that easement so we like to bring that, we just like to note that in the staff report to say that these are things that we see. We've had discussions with the developer and they can, I'm sure they'll speak to the fact that like I said they have different building styles that wouldn't utilize the full building pad and how they site it on the site and they can talk about what the market is telling them what they would like to see and what their buyers are desiring now in this economic climate. Another discussion that we've had is with regards to the impervious surface coverage on a lot. When we start looking at particularly at some of these neck lots, again it's an oversized building pad so we just wanted to bring it, have that conversation. Make note of it in the staff report that depending on the house out there they might be approaching, they might be getting very close to the maximum impervious surface coverage. We like to note that. The developer had indicated that they would be doing some disclosures with the builder that they're looking at on the site to make sure that they're aware of the 25 percent standard. The desires, we don't want to be in a position where a building permit comes in and the home that they want to put on the lot simply doesn't fit given the impervious surface coverage restraints so these are all things that we like to earmark because it is such a challenging site. These challenges arise on a site like this so we just wanted to make note of that in the staff report. I haven't had a chance to go through the developer's comments that were submitted this afternoon in great detail. We had some conversations earlier today with the grading and the drainage to the south here and I just wanted to speak to that. I know we've had some correspondence distributed to the Planning Commission so I felt it would be prudent to go over what we're looking at for drainage to the south and again the developer's engineer is here to answer any questions that you might have with regards to that design. So when they were looking at this site there's a drainage treatment feature here and then they're looking at another feature here at the back of Lot 4 and somewhat into Lot 3 and 5 but this area right here and it's this area that drainage underneath Lake Lucy Road and to the properties to the south. We do have another slide that shows the pathway once it goes south of Lake Lucy Road but just wanted to go over a little bit of where we're at with the design of this system and doing the analysis on the existing to the proposed conditions. We want to make sure that, that what's being approved is feasible and that it's s something that will work long term. We want to make sure that the drainage, the grading plan shown here and the assumptions that were made in the drainage report are reasonable and ultimately that's how the drainage system will function so we've had conversations with the developer's engineer and will continue to do so as we move and refine that process. As I mentioned when we looked at that drainage feature on the south side of the site it drains underneath Lake Lucy Road. This green line here indicates the existing storm sewer that would convey that drainage to the south. And then there are a couple of driveway culverts on this property that extends to the island within Lake Lucy so it flows. It's a 4 Chanhassen Planning Commission — May 17, 2016 circuitous site, or pardon me. A circuitous route. It comes around through here and kind of winds down through here so as you can see it's a meandering path and the developer has designed the pond so that the rate and volume after development would not significant, would not increase. There's a little bit of tweaking for what we call the 10 year event. What you would expect to see once every 10 years so I feel confident that we can keep working with the developer to achieve that goal but that was one of the concerns and again a challenging site. One of the design parameters that staffs been working with the applicant on. Generous: Then landscaping. Actually I want to get back to, as part of this development there's a, the City reviews it under the tree preservation ordinance and what we do is initially establish what the total canopy coverage of the site is and so that comes out to be a percentage of the total development. And then our ordinance establishes targets for preservation of canopy coverage. Because we were aware that as part of any residential development you have to put in a public street. You're going to take out trees. You have to put in stormwater improvements so you're going to take out trees and so what the ordinance says if you can meet that target we won't penalize you. If you can't meet that target then you have to replace those trees you're taking out at a 1.2 to 1 basis so it gives us a numerical way of determining how many trees need to be planted as part of the subdivision. The initial landscaping plan submitted by the applicant showed 66 trees that are being replanted on the site. However based on staffs review and our tree preservation ordinance the applicant needs to provide I I I trees. Primarily we get it in the buffer yards along the streets and at least 1 tree per front yard. We believe as part of this development those extra trees will have to go into the revegetation of Outlot 1 and on the east side and maybe along some of the other perimeters in the project. Especially staffs concerned with the view from the house that's directly to the north of that. That they still have that more native feel on it but we'll work out that revised landscaping plan as part of the final plan submitted and the final plat application process. And of these trees 75 percent of them have to be an overstory type tree so they'll be larger trees. Eventually they'll revegetate the site and it will probably better species than are there now because there's a lot of boxelders and ash in place and so. With that staff is recommending approval of the rezoning of the property to single family residential and preliminary plat approval for 12 lots and 1 outlot and public right-of-way with variances for the use of the flag lots, cul-de-sac bubble size and local street center line offset of less than 300 feet and a building setback variance from the cul-de-sac for Lot 11 to permit a 20 foot setback from the right-of-way subject to the conditions of approval in the staff report and adoption of the Findings of Fact and Recommendation. With that I'd be happy to answer any questions. Aller: Anyone have any questions at this time of staff? Commissioner Weick. Weick: Give me a second. For the 300 foot variance, that's between Street A and Lake Lucy. What is the distance? That we're varying to. I couldn't find it. It's hard to read. They're blurry right. I'm an old guy. 5 Chanhassen Planning Commission — May 17, 2016 Fauske: Commissioner Weick if you wouldn't mind proceeding with some of your other questions and I'll take a look at that and provide you with an answer. Weick: Yep, that'd be great. And then the other question I have is in reference to the bubble. The cul-de-sac bubble variance. If you could explain that, exactly what that variance is asking again. Generous: Do you want to? Fauske: Certainly. Commissioner Weick I would be happy to answer that. Weick: Oh, I was hoping that was over here, sorry. Fauske: So through the design iterations on this site staff worked with the applicant. Originally there was, this feature was actually over on this side and we had a meeting and a discussion and got a larger feature moved over to this site and one of the concessions with moving the stormwater management feature to this site would be that, we would be willing to reduce the setback and the right-of-way requirement for the cul-de-sac bubble so that Lot 11 could be shifted further to the west and allow to accommodate in this. My understanding is that this plan doesn't necessarily show the reduced setback and I apologize if I'm incorrect in that. So there's still an opportunity to shift this further to the west and so we've included that in the recommendations to approve the variance understanding that we still have a little bit of the stormwater design work to finalize and so that if this feature needs to increase in size to the west, that the Planning Commission has already made a recommendation with regards to that variance so that it would be, that they could move forward with shifting Lot 11 further west. Weick: So we're not changing the diameter of the cul-de-sac then? Fauske: Correct. The actual street cul-de-sac diameter remains the same. It's the right-of-way that we're reducing correct. Weick: Thank you. Aller: Yep, Commissioner Tietz. Tietz: Yeah Bob and Alyson maybe, I don't know who I should direct the question to but it appears from looking at the topo map that the drainage basically breaks down from southwest to northeast. We have the greatest number of homes and lots in the southwest side but the capacity to hold water is all in the northeast side so I'm really concerned. My concern is about the overall drainage. Have there been calculations assuming a typical, if there is a typical home that would be built on this site, considering the hard surfaces for the house. The hard surfaces for proposed driveways. Hard surfaces for the roads. What percentage of the 8.96 acres is hard surface and it looks with the mass grading we're going to have severely compacted clay soils which have 0 Chanhassen Planning Commission — May 17, 2016 naturally been infiltration's been quite natural for the last probably 40 or 50 years. I just, what is the analysis and what's the impact? Fauske: Sure. I'd be happy to answer that question Commissioner Tietz. In the stormwater analysis what they've done is, they've taken a look and they developed the drainage area boundaries based on their proposed grading so with, in response to your question about splitting the drainage. What goes to the north and what goes to the south, the storm sewer catch basins within the street would capture the runoff from the street and place it to the north. So that, and the design, the grading design and the storm sewer design is such that the area going to this south basin would be, and I'm not accurately drawing them. I'm just going to show it representatively but, and I believe in the staff report there was an exhibit that shows the portion but a small portion of the back of Lot 6, through the side of back 5 and then looking at the house pads that they're showing on the grading plan, approximately 75 percent of the grading, of the building pad draining to the south to that pond. With regards to the question with the stormwater management and how they model this, the model includes what they call a curve number and a curve number assumes a certain amount of impervious surface on a residential lot so the assumptions that, the numbers that were placed in the report we agree with. It also takes into account the soil type so when we look at the current soil type and the proposed soil type, the current soil type as you had mentioned we've got, we've got some tree canopy coverage and some soils and one of the concerns that staff, that we've been talking about is getting that model to accurately reflect what the soil condition would be after construction because as you mentioned you're moving dirt around. You have equipment on there. It does get compacted. It has that higher potential for runoff and those are all components that can be added into a stormwater model. So as I mentioned we're very close on the runoff discharge rates and volumes and we just want to be sure that we're getting an accurate reflection of the soils after construction in that model. Tietz: Okay, good. Thanks. What's the frequency of 10 and 100 year storms in the last 10 years? Fauske: They've recently updated those numbers so it used to be a 100 year event in Chanhassen was 6 inches and I know it's increased. Each of the storm events have increased in the actual inches of rain based on what they've been monitoring in the area so that has changed and that's been reflected in the applicant's drainage calculations. Tietz: Okay. Yeah we see more frequency. All you have to do is look at Houston and look at Florida today. We're getting 6, 10, 20 inch storms. I don't think we're immune and we have to be able to address that and deal with it on all of our construction. Aller: Commissioner Madsen. Madsen: I believe this is directed to Alyson. There's a reference to a term that's a bounce of water. Could you clarify exactly what that means? 7 Chanhassen Planning Commission — May 17, 2016 Fauske: Certainly, I'd be happy to. I believe, is that with regards to, I know there was a resident that had some, had submitted a comment about the bounce. So that's a terminology that we use when you have a water level and I apologize to those at home that might not be able to see this. If we normally have a water level here, if it fluctuates up to this level that's what we call a bounce so as you've got runoff coming to that area you see a bounce or an increase elevation of that low area. That wetland. That pond and so that's what we refer to as a bounce. Madsen: Okay, thank you. Fauske: You're welcome. Aller: Additional questions at this time? Aanenson: Can I just add one other comment too. The reason why this wasn't on your last Planning Commission meeting is the deep dive that was done on the storm, managing stormwater. It's complex as Ms. Fauske just said. It's complex so we did spend a lot of time making sure that we got it as close as we could before we brought it to you. Is there some minor tweaking? Yes and a lot of that included instead of having drainage on either side of Lot 12. Combining it. Making that a better drainage and in that we agreed to compromise and move Lot I 1 over so there was just a lot of work done on that the last 2 or 3 weeks so. Tietz: Kate it may be hard to impose on development but you know we look at a lot of slow retention systems on all the commercial properties. How many times have we dealt with that in the last 6 months where something has come and we have a holding system that then releases or we have a system beneath a parking lot that slow release. You know if it's appropriate at some point and it's the only way to deal with downspout issues and driveway issues is it, it's probably not practical but should we be considering some type of homeowner retention systems to reduce the flow rate? Aanenson: Don't disagree. And then for this project you know it's infill which makes it more complex because the existing things, the developments around them were not built to those same standards so it's how do you balance, making this meet the standards where there's maybe some surrounding developments that weren't built to that standard so trying to make that work. We've talked about other ways to managing stormwater. Requiring that they keep it on site using it for potential re -use. Those are things that we're looking at as we move to the future but again on this project we worked really hard, engineering staff did working with the applicant to get, to make sure we were had this right because it is a concern to the property to the south, we understand that. Generous: Chairman Aller to answer Commissioner Weick's question, it's about 190 foot centerline offset. 190. 8 Chanhassen Planning Commission — May 17, 2016 Weick: Thank you. Madsen: I one more comment. Aller: Commissioner Madsen. Madsen: There's a comment in the report about leading the staff to conclude that it's unlikely that more water is not being directed south than is claimed. Can you tell me what you were able to study and what changes could be made to get you comfortable with the numbers so that water is not draining southward. Fauske: In the staff report I believe that's around page 8. One of the assumptions that I believe is, or that's discussed prior to that comment was with regards to getting the drain spouts on the building pads directed to the north and the challenge with that is now, is that we're now dictating for the homeowners how they're setting up their drain spouts. I think the applicant, if the applicant has some ideas to remedy the concern expressed in that comment. One of the things that you know I think they've talked about, and please correct me if I'm wrong, if there's a way that they could connect that drain spout to a system that is forced to direct it towards the street so that it's not just a drain pipe above ground but that there's a way that it's actually forced to go to the street but those are, that's the question. The other thing that we could do is if it's going to, if it's going to go to the south that the feature here on the south side is just sized appropriately to accommodate that and I would like the developer's engineer to be able to comment on that as he's, he's designed the site. Has the most knowledge of the site and can really speak to what some of the challenges are with regards to the drainage, specifically Lots 1 through 5. Madsen: Okay, thank you. Fauske: Thank you. Alley: Seeing no additional questions at this point in time for staff we'll go ahead and ask the applicant to come forward and make it's presentation at this time. Tent' Forbord: Good evening Mr. Chair, members of the Chanhassen Planning Commission. My name is Terry Forbord. That's F=o-r-b-o-r-d. It's my privilege to be here this evening and representing a couple families that are long tens Chanhassen residents of many decades. The Krueger family and the Claybaugh family. We were selected from a group of developers to represent them and to develop their property. I'd like to launch the power point if I can because I'll use it as a reference. If you could put it in slide format I'd appreciate it. Thank you very much. I represent Forbord Land Company. I'm the owner and principle. Oops, it's moving and I'm not touching anything. How do we do that? Okay there it is. I'll handle it from here if that's okay. Hemlock, excuse me. Yosemite Holdings is the Holding Company that we're using for the development of this subject property. As I mentioned I'm the principle with Forbord Land Company. I've been doing this for 39 years. I've developed well over 5,000 home sites in 0 Chanhassen Planning Commission — May 17, 2016 hundreds of subdivisions, primarily in Minnesota. Some in Colorado and some in Florida. I'm not going to go through a whole bunch of things about me because that really isn't what's important. There it goes again. It's moving. How do we get this so it goes one at a time? Fauske: I was going here and I apologize. Terry Forbord: Oh that's okay. So rather than talk about me and all the projects that we've done I'd like to focus just on the ones herein Chanhassen that some of you might be aware of. Some of you might live there. So if I could just get to that next page. And this is an exhibit that kind of displays those and those primarily I directed the development of these communities. Near Mountain, which is in the northeast corner of the city. Longacres which is on Highway 41. Willow Ridge. Willow Ridge is right down the street from this subject property. There's Springfield down in the southeastern portion of the community and then Highlands at Lake St. Joe is over on the western boundary. That represents hundreds of home sites. Those were all frankly done in the 90's and I was the President of a company called Lundgren Brothers Development at the time. Since that time I've developed, as I mentioned, thousands of other home sites around the metro area but what's more important is the ones in Chanhassen. I'm very fortunate to have very fond memories of former mayors and city council members and planning commissioners and Carver County commissioners and Met Council representatives because we all worked very hard to extend urban services to this area. As Mr. Tietz was mentioning it was all corn field back in the day. I also had the privilege of working with many of your staff members that are still with the City at this time. This subject property, it was referenced a moment ago that it's an infill site. Definitely this is an infill property. Being on the Planning Commission you're probably quite experienced with the fact that infill sites are always much more complicated than green field development. I can say honestly in my entire career I have never worked a site as complicated as this site. Ever. That doesn't mean that there were any particular individuals that were problematic or anything but there were on site and off site constraints. There were infrastructure constraints, et cetera, et cetera. The good news in that is, and it was just kind of touched upon a little bit but it's appropriate for me to say that there was a very unique process that we went through and part of it is due to my style but a good part of it is due to the style of the staff in the City of Chanhassen. I rarely, I just don't submit applications unless I've had countless meetings with the staff and we've all come to an agreement generally on what needs to be done in order for a development to proceed so we started that process in January and we've gone through probably no less than 20 reiterations of just the site plan for 12 lots. You've heard about the challenges about access. Ideally from a pure development point of view, pure development coming off Lake Lucy Road would have been the most efficient and effective way to do that. However it's I believe a minor arterial within the city and from that standpoint it wouldn't have made any sense. The next best pure development entrance would have come off of Yosemite from the north and that would have gone inbetween those 2 wetland complexes and from an efficiency and a development scenario that would have been the second best but what it amounted to though we would have had to clear cut a bunch of the trees in that wetland area which is now one large outlot and it would have forever changed the way that that piece of property would have looked from the streetscape so just like every other step of the way If, Chanhassen Planning Commission — May 17, 2016 we got together with staff and we started drawing various reiterations of how is the best way to do that. And like I said 20 concept plans later the most efficient and effective way to do that was what you're seeing this evening. Just a couple things that are still in play. We agree with everything in the staff report by and large except for maybe 4 things and tonight I'm not here to debate those with you and debate those with the staff. We've worked very closely on that. We just gave you a handout to make it part of the record. What we're going to do just like the staff has recommended approval there's all these conditions and in that report it says they're going to continue to work with the applicant prior to final plat to come to a conclusion on all those things and I'm confident that that will happen and so we're okay with that. Those 4 items that we put in front of you were just put in there for the record. We haven't had a chance to finalize all those discussions with the city staff but it's been a very interactive productive process and I'm grateful that we have a city staff that we can do that with. One thing that Alyson pointed out very well was that if we could get up the site plan if you have it easily in front of you. That area where she was talking about the biofilters. Could you point to that area? Now that area right there, about 3 or 4 reiterations ago there were 4 of those pre-treatment ponds on the site. Well we all know from a practical application to maintain those and repair them, whatever needs to be done if there's 4 small ones it's highly inefficient so we spent some time. How do we merge all those into one? Now ordinances are very important because they kind of create a framework for development to occur but sometimes when you look at environmental concerns or things like that you say you know what, the smartest thing we could do was to put all those biofilters into one outlot. That way it would be more efficient. It would be more effective and if we have to maintain it we have one access to it and they're just a far better way to do it so she talked about part of that process and it includes shifting Lot 11 and Lot 12 to the west. That space between there and the cul-de-sac bubble will shrink and they did that by putting like a 5 foot variance on the setback but what it's going to do from an environmental standpoint and efficiency standpoint, stormwater management is the right thing to do so that's the way this whole process has been and it's been very constructive. So I'm not going to go into a lot of detail about everything that has been accomplished to date because I believe it's actually been summarized quite well and memorialized quite well in the city staff report and we agree with it. The last thing that we'll do prior to addressing any questions that anybody might have is that Roger Humphrey my senior project engineer with Stantec who's with me this evening is just going to go over the handout with you just briefly but we would like to get into the public hearing component of this and address any questions. That's probably the most efficient use of our time but prior to me handing this over to Roger just to have him touch base on that handout is there any questions that the Planning Commission has of me? Aller: Anyone at this point in time? I'll just quickly address that. For purposes of the neighborhood what is your expected price point on these homes? What's the valuation that you're looking at? Do you think that this is going to have a good or bad negative impact on the pricing for the neighborhood? Terry Forbord: That what would have a negative impact? ]fl Chanhassen Planning Commission — May 17, 2016 Aller: I'm saying the fact that we're infilling the neighborhood, if you can. Terry Forbord: Yeah I'm very familiar with this area. I live 3 minutes away in Shorewood so I'm in this area all the time and have been for 35 years. I've watched all the development patterns and as you can see by the slide I've developed a lot of the home sites in the area. That's just in Chanhassen. I can see that the target market for new homes on this particular site will be in that $750,000 to $1.2 million. That's the range that will be there and I'm meeting with a number of builders. I'm close to selecting one builder which I'd much prefer to do. It's much easier for all parties to have one builder on a site like this but I think by, if you're familiar with the existing condition on the property vis a vis what we intend to do with it, I think it's a fair statement that it will be similar to the other new communities that have developed along Lake Lucy Road over the last 10 to 15 years. Aller: Alright. Terry Forbord: Any other questions? Tietz: Yeah I have a question. How did you arrive at the number of lots and what was the minimum number of lots and the maximum number of lots that you considered during this study period? Terry Forbord: Well frankly if you look at the Met Council requirements of the City of Chanhassen on the amount of units that are supposed to be in these various districts, from a pure math calculator standpoint there should be about 22 home sites on this site. However when you start, one thing that I learned a long time ago is that dirt is never in the right place. The roads are never in the right place. The trees are never in the right place. The wetlands are never in the right place and the pipe is never in the right place so once you take a site and even though your calculator tells you X, that you should be able to get 22 home sites, the shape and all the other aforementioned items change the developability of the property and so we had reiterations that went from I believe it was 11 to like 18 and we settled at 12 working through this process with the city staff. Tietz: And what were the critical site factors that influenced the design? Terry Forbord: The primary, there's two primary ones apart from trees, wetlands, those type of things. One is the sanitary sewer invert depth which completely was, is a huge factor. Secondly is the stormwater management limitations and so those items became very prevalent apart from trees, wetlands, topography, shape of the property, et cetera. Any other questions? Tietz: One more. Since you're the developer and not the contractor correct? You're going to select a contractor for the homes? Terry Forbord: Are you talking about the home builder? 12 Chanhassen Planning Commission — May 17, 2016 Tietz: The home builder yeah. So you're not the contractor for the homes? Terry Forbord: I'm a real estate developer and I work with home builders, correct. Tietz: So how do you, all the conditions that have been presented to you, how will those conditions be handed off to the home builder? And who's going to control that process? Terry Forbord: Well there's a couple ways to do that. I tend to like to do both ways. One is I memorialize those conditions in the purchase and sale agreement with the builder. It should be pointed out that I'm meeting with the builder now and I've gone over the staff report with the builder this week. We're very close. We do a lot of business together. We're friends so there's, they have a 45 day feasibility period in their agreement with me so they get a chance to go through all of that and they know as much about the project today as I know so, but we added as exhibits the conditions of approval are added as an exhibit to the purchase and sale agreement. In addition to that there will be a homeowners association for this property and items that are of importance become part of the CC&R's of the homeowners association. Items related to easements as Alyson mentioned, they become deed restrictions on the title so it's good to have multiple ways of memorializing important things to make sure that nobody says later on well nobody told me or nobody mentioned it. Even when you memorialize things like this 1,000 percent sometimes people say well nobody told me. I didn't read my title or I didn't read my purchase agreement. Those things happen but the best way you can do it is have as many ways as possible so nobody can say nobody gave me anything. So I hope that answers your question. Tietz: Thank you. Aanenson: If I could just add to that too. We did spend some time talking about that at staff. I mean it's not uncommon. That's a lot of how development's done these days. You have a developer then a builder so in this circumstance we talked in detail on some of these unique attributes to each lot and hard cover and all that so the person looking at that lot may know a certain type of home. How that hard cover, drainage issues, so those will all be spelled out by lot. We talked about that would be part of the final documents so we have tried to think through that issue too. Tietz: Okay, thanks Kate. Terry Forbord: And these issues that you brought up Commissioner Tietz are actually quite common these days. Sophisticated builders want to know very much all the detail about that. It's always important to, I personally I identify the builder as the conduit to the consumer and so it's important that the builder really understands those things and the builders that I work with do. They live and breathe this every single day. Tietz: Okay, thanks. 13 Chanhassen Planning Commission — May 17, 2016 Fauske: Chairman Aller? Aller: Yes. Fauske: If I may add onto that. In addition to Mr. Forbord's due diligence with the information he provides to the builder, the conditions of approval from a final plat are included in a development contract which is recorded against each lot within the subdivision so there again there's another way that a property or builder would be able to know all the conditions required with regards to this subdivision and that's true with other subdivisions that is brought forth to the Planning Commission as well. Aller: Thank you for the clarification. Terry Forbord: Thank you. At this time I'd like to turn the podium over to Mr. Humphrey, our project engineer. Aller: Welcome Mr. Humphrey. Roger Humphrey: My name's Roger Humphrey. I've been doing land development engineering for over 20 years. I have my own company for much of that. I joined Stantec somewhat recently as their senior land development engineer and been working closely with Terry and staff all the way back, I think we started designing this project in December and worked closely with staff through January, February and all the way through to where we are today and we, we're not showing you everything because there's a lot of information that went through in that design. Terry's right, I think we have 15 different concepts that we reviewed from various access points and we were initially settling on the access north of, in the north end of Yosemite between the two wetlands and I'm really glad to say that we were able to sit down with staff and actually work through that issue of doing a queuing design on the intersection and going down to less than the 300 foot offset. We had a neighborhood meeting back, I forget. April and we had a really good turnout and we listened to all the comments and one of the biggest comments was how beautiful the property looks coming from the north on Yosemite between the two wetlands and primarily that's the area we ended up saving and so we in our demolition plans and the building plans and everything that goes into the design we are able to create basically a protection zone all through that area and connect into two wetlands in terms of an environmental corridor between the two areas and I think that's a project success in the collaboration that we did working together. I'm going to touch a little bit on I guess our responses and comments, not too much. I think they're more intended to just kind of say that between us and staff I think we're working together very closely. I don't see any of these issues that's hard items. It's just that it's good for us to be able to communicate how we want to proceed and move forward on several of these items. I actually also think when we go through this process we often get a lot of conditions and we have 80 conditions through the thing and 76 of them in my opinion are and we're indicating it here are conditions that are standard and typical to final plats and we consider 14 Chanhassen Planning Commission — May 17, 2016 those are moving forward points in terms of advancing the project and advancing the design. In my experience I've never seen that ratio as high as saying we agree 76 out of 80 percent of the, or 80 times out of the whole condition and the remaining 4 items are generally minor in detail. What I would like to address because I've heard the concerns and I'll probably hear some more of it tonight as far as the drainage going to the south. The existing drainage area, and I'm wondering if you could pull up maybe not our stuff but the drainage plan that you guys had up previously. The drainage divide is really kind of from the southeast to the northwest and the area that's existing that goes to the south is 3.7 acres. And the proposed area that's going to the south is 2.44 acres and those are primarily just back yards of that development. I'm sorry probably the one that shows our plan. So it's only part of the lots from 1 through 5 that are actually going through there and the other kind of question or issue with, or discussion that's been having is we show building pads at I think 75 to 70 to, 70 by 70 as an average building pad out there. That's the maximum extent as a building zone and so the houses aren't that big and we have to meet the impervious surface requirements and we provided a chart to do so so that it's very clear on how big they can build on that but that can fit anywhere in that zone. And along with the developer's agreement that's recorded and all the conditions that are memorialized through the process, in addition to that one of the conditions on the building portion, item 4 of the building condition plans requires that to get a building permit they have to submit a final grading plan and that will show the dimensions. How it fits in relationship to all the other concerns that are addressed and that and I think that's a very important condition that we want to see happen as much as the City because that insures a quality and good project. The only other thing that might not have been touched about in the drainage aspect is that we have two wetlands on the north and primarily most of the water coming off the roadway is coming into the wetland to the east and we're putting a pipe under Yosemite Road that will allow the conveyance of any additional waters and items of that to provide lower high water marks and items of that nature and the City has a lot more capacity easements and other controls downstream in that area. Bob I wonder if you could go to the landscaping plan on your's too. And again I'm just trying to correlate some of the things that how we looked at our design and how we tried to accomplish these things. The buffer trees that we show along Yosemite and Lake Lucy down on the bottom of that screen, we understand that we need to plant more overstory trees and we need to accomplish that but just in our approach on the design is that that line is a series of overstory and understory trees so we have a tree here and a tree here and a tree here and so the idea is to create the screening that goes through in that process and that was basically our design approach and so we'd like to keep the integrity of some of those items as we go through and of course in this process of we design. We hand it off. We receive comments and back and forth, that communication process is I just wanted the Planning Commission to understand the background of what we were proposing. The last item and it is one of our conditions that we wanted the Planning Commission to be aware of is the requirement of removing all the trees from within the right-of-way that we're planting and we understand the concerns in terms of maintenance and things that go along with that process. We have from the front yard setback we have 30 feet and then we have a 15 foot boulevard so that gives about 45 feet of planting area in the front yards. If we take 10 feet away from the building side just because we can't build a, plant a tree really much closer than that and we take the 15 feet off the right-of-way all of a sudden we're down to about 20 feet which is less 15 Chanhassen Planning Commission — May 17, 2016 than half that zone and these will all become yard trees but it just seems in an aesthetic aspect that, whether we can take a consideration of having some of those trees be planted in the boulevard obviously set back from curbs and sidewalks in an appropriate manner but it just gives us more of an aesthetic aspect in the design of how the subdivision looks and is approached from that standpoint. But from that standpoint I'd like to thank everyone and if you have any questions for me I'm happy to answer them. Aller: Any questions at this time? Commissioner. Tietz: I have a question about the trees. Since that is a big concern and I'm not so, I shouldn't say I. I think screening a residential development from Lake Lucy may not be as important as providing canopy trees back into the development that you're creating and I'm just you know questioning staff and questioning the City whether there's a way to escrow or bank trees and as the development is constructed of putting trees back into those front yards and along that street so that you're recreating a canopy in an area that had canopy for many, many years as opposed to stuffing them along Lake Lucy. But it would, you know the site grading, you're grading, you're mass grading almost 70 percent of that site so putting trees in before construction starts I think they soon would become twigs and splinters but if there's a way and this may be a concept that's inappropriate but to consider banking those trees and having the developer put trees in after the fact. Aanenson: Just to be clear on the condition that we have, they're still short 45 trees. Tietz: I'm talking about the 110 trees you know. Aanenson: Sure, yeah. Right so what I'm saying the landscaping plan doesn't show the shortage of the trees so that's something that's not that uncommon that we've done in the past after the house gets placed so that's something we can run past the Forester. That's an issue the Planning Commission wants to look at. Tietz: It may be a way of dealing with the canopy issue and the understory issue and creating a more inviting neighborhood and increase the value of the neighborhood. Alley: It will also help the stormwater. Tietz: Pardon? Aller: It will also help with the stormwater. Tietz: Potentially yeah. Roger Humphrey: We spent a lot of time identifying the trees. Specifically a lot of the perimeter trees and one of the things we heard from the Planning Commission and I went out and 16 Chanhassen Planning Commission — May 17, 2016 looked at the site to, or after sorry. Our neighborhood meeting I went out after the site to just evaluate and look at the site as is from a standpoint of where these are and how the trees look and part of that was the entry coming in on the corner of Yosemite and Lake Lucy and as you turn that corner going north on Yosemite, straight ahead is a group of trees. They're fairly set back from the right-of-way and there's a fair amount of trees along Lake Lucy that as we kind of redid this new design I think those trees are being preserved through the process and we take our business very seriously and we are experienced in the design and layout and construction of these things and so I'm the guy that's out there with Terry. That's why when we had the neighborhood meeting and I heard what we heard it's an opportunity for us to get to know the neighbors and at the same time we can save trees potentially but also when they're in certain areas you know it's a risk factor to save them or not save them and I think we'll do our best in terms of preserving those as best as possible. In that corner intersection where we moved the watermain over. We moved some of the utilities out of the way. That gives us a better opportunity to save those trees as well. Thank you. Aller: Commissioner Madsen. Oh Mr. Humphrey, we have one more question Mr. Humphrey. Madsen: One of the conditions is that the runoff rates and volumes cannot be increased to the south. Could you just touch on how that will be accomplished? Roger Humphrey: Sure. Again that's why I kind of wanted to mention that. The primary means to that is limiting the area that goes to the south and we felt we did that. I think staff is, wanted to insure how we do that and I think as we move forward through the final plan portion of that. You know I see that as a very easy thing to do or to document that that water goes and where that dividing line happens to be. In addition to that the area that does go south is primarily the back yards of the homes and there's, these are longer, deeper lots and with our newer design there are areas that are undisturbed down in that lower area and we also have room to create stormwater ponding and devices that help control the rates and volumes of that and we believe that's appropriately sized and I think staff would agree with that size. I think the concern that staff has, or at least has put in their comment list is whether we can document the dividing line between that stormwater and I think we can do that so. Madsen: Okay, thank you. Roger Humphrey: Thank you. Aller: Alright, thank you. With that I will open the public hearing portion of the meeting and what will happen at this point in time is anyone wishing to speak either for or against the item before us, or has a comment to make can do so at this time. You would come up to the podium. State your name and address for the record and then let us know how you feel about the project. Any individual with us tonight wishing to come forward? 17 Chanhassen Planning Commission — May 17, 2016 Kim McReavy: Hi. I'm Kim McReavy. I live on Heather Court in Chanhassen. I was at the neighborhood meeting too because I'm concerned. I live near this area, although I'm not abutting it so I wasn't noticed or anything but I have a lot of friends who live in the area who are very concerned as well and they would have been here. They were supposed to come to the meeting 2 weeks ago and for some reason it was put off and I missed the beginning of the meeting. Maybe you explained why it was moved but they'll be at the council meeting so I walk by this area every day and there's a ton of wildlife on it. It's lovely. There's, I know they're going to take out 200 trees on it and I'm concerned with that and mainly because of what has happened across the street and I'm sure you've all noticed what's happened on, with the Weekley development on the comer of Yosemite and Lake Lucy. I think it's a travesty and the houses there I feel like really are cheapening the feel of Chanhassen in general. They look out of place. They're extremely close to the street. I really don't know how they're going to sell them but I guess that's not my problem but on a bigger issue for the City I'm concerned with this infill development that's happening. I don't think we need to fill in every single area in Chanhassen and as I drive down Lake Lucy and as I drive down Powers Road I just see lots of opportunities for this type of infill development where, and just because you can do it I don't think means you should so. For this development in particular I'm concerned about the loss of 200 trees. I know the developer was talking about nothing's ever in the right place. The wetlands aren't in the right place. The streets aren't in the right place. Well maybe if it's not in the right place then it's not the right place for this type of development and that's probably why it hasn't been developed yet so that is my concern too. I know that they were talking at one point about possibly tonight saving possibly some of the trees on the comer and I hope that if nothing else that can be accomplished, although at the neighborhood meeting they had pretty much said they were going to clear cut most of the property except for around the wetland which is delineated so that is my concern as a Chanhassen resident. I love living here. I know the developer has said that he loves Chanhassen too and has concerns with this area. Well I like Shorewood a lot too but I'm not really concerned as much as to what development is going on in there, you know as I'm sure the residents of Shorewood that live in the area are so as a resident that lives near that area and walks by it all the time I'm not in favor of this particular development so thank you very much. Aller: Thank you Ms. McReavy. Sir you said you want to come forward? Come on up and give your name and address for the record and let us know how you feel about the project. Andrew Hebert: My name is Andrew Hebert. The last name is spelled H-e-b-e-r-t and I live at 6566 Shadow Lane which is directly adjacent to that Glaccum Highlands development and it's because of that development I can said some things that I was going to that I wanted to attend here tonight. We just bought our house there herein Chanhassen just about a year ago and we knew the development was taking place. We had looked at plans and did a lot of research before buying the home. You know however what we've seen over the past year has really given me very little confidence that the plans will be followed and that the City or the developer or the builder really has the best interest in mind, you know the community's interest and the current residents interest in mind when they're making these decisions. You know the situation with my home is just one example but now I have a house literally right in the middle of my back yard 18 Chanhassen Planning Commission — May 17, 2016 view. You know maybe it's 10 feet from the property line. It's a different direction, layout entirely than what was on the drawing and so I've come to find out that a lot of these things that are talked about here at this stage they don't always get passed down to the builder and you know once it gets to that point it's just concerning that there's no controls in place to make sure you know we're looking for the interest of the people that already live here and so you know just watching everything take place from my back window, the destruction of all the trees. The impact on animals. Like Kim was saying, you know there's deer walking through there all the time. I used to see them. I never do anymore. And so that were some of the main things. I know with that development there were things like retaining walls and things like that that have not come to fruition as they were promised and I think they look bad. One thing I like about the area is the maturity of the trees and the homes and as someone coming from Eden Prairie that really appealed to me and so I feel like to just totally clear it out and regrade and do all these things is very risky and I don't think it's just a given that people are going to come and want to pay for that because it's, you know it's not the same place that you think of when you think of this area and so I think one of the problems as I've learned about the Glaccum Highlands development is that the builder is non -vocal and so I really wish I could have been you know more involved and the other, in that property because I think that maybe had something to do with it. I agree with Kim, I think the houses they look out of place. They look cheap you know and I just have not been happy with how it's gone and so I'm not opposed to development in general. I just think maybe there could be fewer homes and less of an environmental impact to help preserve the integrity of the community so thank you for the chance to say that. Aller: Thank you Mr. Hebert and welcome to the community. Andrew Hebert: Thank you. Aller: Any other individuals wishing to come forward? Please ma'am. Betsy Randall: Hello, my name is Betsy Randall. I'm at 1571 Lake Lucy Road. Directly across from this development. First of all I know the City has worked hard. The staff has worked great on this. I mean being really concerned about the water runoff and everything but I still have some concerns. There was a mention earlier in regards to if the ponding along Lake Lucy Road got to be too much that they might pump water or something onto Lake Lucy. Well there's nowhere for it to go. It goes right back down into my property or my neighbor's property and back through the cycle so I'm not sure how that would work. As I said the concern is the water issue and yes, looking at the 4 houses across Yosemite is not nice. I have been here 20 years. I moved all the way from Deephaven where I grew up. Love the area and as I said the City, the staff has worked hard on this I know. The rest of it I mean if they could cut down more houses that would be fine or fewer lots but I'm not sure that that's going to happen so that's my little piece. Aller: Thank you very much Ms. Randall. W Chanhassen Planning Commission — May 17, 2016 Betsy Randall: Thank you. Aller: Any other individuals at this time wishing to come forward? Sir come on up. Craig Claybaugh: My name's Craig Claybaugh. We live at 1630 Lake Lucy Road. Aller: Welcome sir. Craig Claybaugh: I served on the Planning Commission myself for 2 terms. I got used to people being resistant to change. Everybody is. The one constant is change. Al he moved in 1980. We've been here just about 25 years. I think Betsy I would guess she was therefor 40 plus years. That home was built in 1910. Just want to provide a little context. I understand it's change for everyone but when we moved in it was a dirt road. There was horses, 200 of them at the end of Lake Lucy Road. One by one they came in. Centex. Lundgren. And it was Robert Mason and Lecy so a lot of the properties we're talking about on Lake Lucy Road weren't here when we moved in so we've endured change. Mrs. Claybaugh: And we had horses. Craig Claybaugh: And we had horses. All those things needed to be forfeit over time to make room for the community to grow so it doesn't carry anymore weight than anything else. It just provides context so like I said we haven't been here 5 or 10 years. We've been 25 years. The reason the property wasn't developed is we raised our kids here. Our kids graduated from college. AI retired in December and it was time to make a life change. We selected Terry because far and away he's the best developer we could find. I worked with Kate for many years. I know her degree of due diligence. When they say they've done their work, they've done their work so just like that to be part of the record. Alley: Thank you. Anyone else wishing to come forward? Speak for or against. Yes ma'am. Charlotte Frerichs: I'm Charlotte Frerichs. I live at 6648 Lakeway Drive and I walk by this property every day and of course I'm grieving because I'm going to really miss the turkeys and the deer and the beautiful trees but I was very encouraged tonight to hear that the really the lovely trees right on the comer may actually be preserved but of course they have to be really careful that they don't damage the roots and there is a little retaining wall. There's a hillside that goes in that direction and I don't know exactly what they're going to do with that but if they take all that down I'm afraid it will damage the roots of those trees. And I might add also that that David Weekley property is really hideous and we're all really upset about it and I think that those retaining walls that are supposed to go by the wetland are so high, I don't know if any of you have driven by there but honestly if a child would fall they would be killed and they just put up a little teeny split rail fence there and I really think that the City should take a look at that. Thank you. 20 Chanhassen Planning Commission — May 17, 2016 Aller: Thank you for your comments. Roger Frerichs: I'm Roger Frerichs. The other half and also on Lakeway Drive and I just, we had a little question about this drainage. There will be more drainage I imagine than what there is right now down on the south, towards the south. There is you say a storm sewer down there already? Culvert going under Lake Lucy. Is that right? Fauske: Thank you Mr. Chair. Yes there's currently an outlet underneath Lake Lucy Road to the south. Roger Frerichs: And I just, the drawing shows a pond down there on the north side of Lake Lucy Road and that would be right adjacent to where the walking path is and is that a pond or is that just something that would pick up water in a rain storm? And then be drained out the next day. Because I think it would be a danger to have a pond of catchment of water down right on the south end of that. Aller: So are you talking about the water on the other side of Lake Lucy? Roger Frerichs: No right there where the pointer is. Aller: Oh up north. Roger Frerichs: And if that is, because the walking path is immediately between there and the road and you know people, kids go by all the time on bikes and people walk and I don't think we want any more water standing than we can avoid and so I didn't quite understand what that is. If that's a catchment basin that would drain immediately within the next 24 hours after a rain. Aller: Right. Roger Frerichs: So there's no standing water anticipated there. And I agree about the trees, that it's nice that there's some talk about probably being able to keep some of those trees but you know, and the comment about the roads, about everything being in the wrong place when development is being put in and I think we've got things kind of backward. I think we ought to try to fit the homes into the topography and that's not the current way developments are done. I mean more or less the development is regrading everything and everybody wants a lookout or a walkout so they grade it up in the front and they grade it down the back and you have no topsoil except what's put back but there ought to be more thought about putting homes in the right place for the land rather than changing the land so that it will fit as many homes as possible. Thank you. Aller: I appreciate your comments, thank you. Any other individual wishing to come forward at this time? 21 Chanhassen Planning Commission — May 17, 2016 Al Krueger: Hi. My name's Al Krueger. I'm part of this and I really bought my property in 1976. Moved in in the 80's or early 80's and yeah Craig's right. We used to go play with the horses that walked by so change is inevitable but the only thing I did want to mention, or that I wanted to bring up is the trees that are on the corner there are very dirty trees. Very, very dirty trees. They're dropping branches all the time. The roots are coming up and they're sprouting all the time and they're a tree that I think it looks beautiful in some sense. It's not an aspen tree as some people have called it so. And the trees, there's a couple nice trees that are on the property but 85 percent of them in 10 years, 5 years they're, it's going to look a whole lot better, let me tell you. As a single home resident who is not extremely wealthy I have to work very hard to try to keep those up and if you walk by there, as some of these people have noticed, there's trees falling down. They grow to the light and they're just going down all over the place but I too love the trees so thank you. Any other individuals wishing to come forward? Seeing no one, you sure? No one, I'll close the public hearing at this point in time and open it up for, based upon public comment. Any additional questions or comments of the commissioners? Canwe just, Alyson could you just talk about that water drainage system on the south side again just so that we're clear and what the jump was. That higher elevation and the impact on Lake Lucy Road if any. Fauske: Certainly. So with regards to, so the drainage pattern is, as you can see here, this is approximately the area where the biofilter basin would be. That takes that southern drainage area that we've been discussing. It would discharge into the existing storm sewer underneath Lake Lucy Road which is shown here in green to the south and from there the drainage pattern is shown here. It goes underneath a driveway. Winds back down. Goes underneath a driveway again. Through a low area here and then ultimately to the lake. I believe the area where we're speaking of the bounce is in this vicinity. I apologize I'm not exactly clear where that is but the bounce that they're referring to and hence the reason for not only requiring the post development discharge rate to be less than existing but the volume to be less than existing is that due to the grades in this area south of Lake Lucy Road where it would discharge to, is that there's no way for the area to outlet and therefore there would be a pooling of up to 5 feet of water before it would find an overland route to continue south and so hence the reason for no additional volume to the south. Aller: So with no additional volume you wouldn't have the bounce? Fauske: Correct. Aller: Or less bounce than we do today. Fauske: Correct, and so the staff report had that in there to again to memorialize how we've come about to the plan that's being presented and the reasons why and also to have, to memorialize that we've looked at the downstream impacts to the development. 22 Chanhassen Planning Commission —May 17, 2016 Aller: And the, just a quick follow up with the retaining walls. Retaining walls have been mentioned. All our retaining walls over 4 feet have to engineered. Fauske: Correct. Aller: And so any retaining walls here, those are conditions that are in the report and would be required of the developer. Fauske: That's correct. Any retaining wall over 4 feet has to be engineered and requires a building permit. Aller: Any additional questions? I think it was 4 wasn't it? Fauske: They've eliminated some from the time we first met with some of the plan iterations I think that's important to point out that we've had some benefit for example with having this drainage feature as Terry Forbord had mentioned combined into one system here. We actually, there was originally a retaining wall in this area so that one was eliminated. The other areas where there's retaining walls is proposed here between Lots 9 and 10 and then at the back here of Lot 9, at the back of Lot 8. Around here at Lot 6 and Lot 5 and that's, as you can appreciate with an infill development where you're meeting up to the grades of the adjacent properties, often times you do see retaining walls in the area. Tietz: I think it was stated that that Lots 1 through 5 will drain to the south but actually 7 and 6 drain around a 90 degree comer to the south too so you know there's, these retaining walls, you know hard edges are created because of the property boundary and it's not necessarily compatible with the adjacent property or the where the topography comes together. It's, you know there's several areas here that just seems to be really forced onto the site and I know that they studied 22 alternatives but you know it'd be a much more pleasing, if I were going to buy a three quarter of a million to a million two house, if you reduce those and put, you know look at 7, 6 and 7 together and 4 and 5 together you can mitigate retaining walls and change drainage and end up with 9 lots instead of 12 lots and up in the upper corner you can eliminate flag driveways. Three flag driveways you can eliminate. You can eliminate potentially reduce or minimize retaining walls and maintain your drainage patterns but reduce the number of lots and have a better merging of property lines. We have no idea what's going to happen to the west in the future. Aanenson: We did look at that. We provided access to those property to the north. There's 2 lots there. There's one is under 15 so it can't be further subdivided and the other one could potentially be subdivided. Probably just like in this process they'd have to, efficiency would be if they combine together. Likelihood of that because they're smaller you only get one additional lot. Less likely because you don't get the lot when you have the value of 2 homes to try to get one additional lot. Could the one lot come in and try to do a flag lot? That would also require a variance on that circumstance. We did look at that. 23 Chanhassen Planning Commission — May 17, 2016 Tietz: Did you look at, seriously look at eliminate flag lots? Aanenson: That's always an option. Tietz: Pardon? Aanenson: That's an option. Tietz: No but did you in the studies, were those studied to eliminate flag lots? There's 3. Aanenson: Correct. Correct. Terry Forbord: Mr. Chair? Aller: Yes please. Terry Forbord: Mr. Chair, members of the Planning Commission. Thank you. There's a lot of good dialogue and good questions happening from both the residents and on the Planning Commission. Eliminating home sites sometimes seems like a nonchalant cure in solving something but it would destroy the development. It wouldn't happen because of the economics. Notwithstanding all the very positive things that happen in a process like this, at the end of the day it's no different than the City's budget that they operate in day in and day out. They have to remain economically feasible and with a neighborhood community that we're creating here it also has to be economically feasible. The development cost per unit on this property is extraordinarily higher than a like kind green fill development in Chanhassen so elimination of any home sites would kill the deal. Aller: Thank you. Aanenson: Can I just go back to that point? Certainly the Planning Commission has discretion on how you want to respond to variance requests, whether you approve them or deny them. The staff had supported recommending approval but you certainly have discretion on that. Aller: Comments, questions? Commissioner Madsen. Madsen: There was mention of monitoring the water that might move southward after the development is completed. Who would be responsible for doing that and who would pay for it and how often would it occur if there was a suspicion that the volume had changed? Fauske: After a development is installed, I'll just back track one moment. I apologize. Through the development contract which we previously discussed at this meeting, the City takes a security for all the improvements installed with the development. Included in that is stormwater 24 Chanhassen Planning Commission — May 17, 2016 and after the developer's installed all the improvements the financial security that the City collects to insure that the project is installed per the approved plan, we release a portion, the majority of that security but we hold on to a portion of the storm sewer security for that very reason so for a 3 year period we're able to monitor the storm sewer system and insure that it's functioning so we do have, and I would, the reason we've chosen 3 years is you can, any anomalies in a dry year you can hopefully get through the next year and it will be an average year so that we can have a monitoring period to insure that it's installed per the plan and is functioning properly and hold the security to insure that any changes necessary to that system are completed. Madsen: Thank you. Fauske: You're welcome. Hokkanen: Can we talk about trees? Aller: Let's talk about trees. Overstory or understory? Hokkanen: The landscape plan is short 45 trees. Does the developer think they can place 45 more trees on there? Can we require them if it was to approve 2 front yard trees? I mean instead of 1. It doesn't even look like there's 1 front yard tree per lot. I mean that would help with stormwater management with the canopy. Anything? Aanenson: Alyson can you go over to the landscaping plan? Thank you. Yes, so one of the things we talked about is there's an Outlot A putting, excuse me Outlot 1. Putting some additional trees there and looking at that. That's something that we'd have our Forester look at. Best placement it was her recommendation to take them out of the right-of-way area so that would be something that we could look at just as was brought up before. We could look at placement once the house is, again you're looking at a box so that doesn't, we don't know what that plan's going to be because the consumer, the buyer is going to pick the house plan that they want and so when they're represented it gives people a false impression. We require a 60 by 60. These are substantially larger because what they're showing is the building envelope so that's the envelope they can build within to meet all the setback requirements so depending on how that sits on the lot, yeah there would be opportunities for trees and I think that's something we could look at as we, if this plan was to move forward that's something that we would come back with the Forester's recommendation on that. Where those would go. Hokkanen: Because some developments we have requirements of 2 trees in the front instead of 1. Aanenson: Exactly, yep. PIAI Chanhassen Planning Commission — May 17, 2016 Weick: In fairness though to that statement, there's 66 trees shown here. To get, we would need 45 more trees. I mean we're not talking about adding 10 trees. I mean this is, I don't even see regardless of how big or small the houses are on those pads, there isn't room for 45 more trees. There just isn't and so, okay. You could stuff them in Outlot 1 just like you stuffed them along Lake Lucy and I'm not sure that does what we, what the true intent of that canopy coverage is. That's my opinion. Hokkanen: I'm not a lover of flag lots. Not my favorite. I don't think it's, if there was a way around it I would like to see a way around it but it's not my favorite. Aller: Well let's talk about if the variance is not then granted because the flag lots don't meet the requirements what. Hokkanen: Just my opinion. Weick: Yeah but I'm not sure. Aller: But we need to discuss it because we have to decide on it. Weick: Right. I mean whether it's our preference or not for flag lots, I don't know. I mean I'm trying to think of the, to Commissioner Tietz's point the, if eliminating the flag lots helps place lots better, or more efficiently help with drainage or something to that effect you know I can see denying that portion of the variance but if it's simply you know our preference I don't think, I don't know that whether we should do that. Hokkanen: Because if you remove them, as he stated it's going to kill the project because they need that many lots. Aanenson: Can I just give you a little bit of our justification in looking at this? All those lots are significantly over the 15,000 and so we looked at kind of in the surrounding area. The Shadowmere subdivision just across on Lake Lucy has flag lots because they were permitted at that time. The main reason why we put the flag lot as a variance request is we wanted to make sure how the houses were oriented because we had people that were, just like we talked about, that lot to the left. If you put a house behind then it doesn't seem right so this way they're facing, really more facing the cul-de-sac so it's more traditional a look. It's just that the area is already larger kind of pinched up in that corner so that was our basis on whether that's right or wrong that's the stance we took on that. Allen: Any other comments at this point in time? Sir yes. Terry Forbord: Mr. Chairman, members of the Planning Commission, Terry Forbord. I want to just comment briefly on flag lots. I'm guessing as residents within this community many of you have lived here a long time or perhaps even in the west metro. Flag lots are all over the city of 26 Chanhassen Planning Commission — May 17, 2016 Minnetonka. All over the city of Wayzata and they're very common in the development patterns that exist and when you drive through most of those communities today you can't tell whether there's a flag lot or not. You see houses within tree canopies and streetscapes that are beautiful. And as was pointed out by staff until the last probably 10-15 years ago they were quite common in Chanhassen so I could take you on a tour all around the Lake Minnetonka area and there are thousands and thousands of them and there are many situations that create a better streetscape by doing it. The particular variance that Kate was referring to allows to be able to turn the house so the house is facing the streetscape which is very important purely from a marketing and merchandising and historic look into the future, or a future look so when you drive through the neighborhood you don't go why is that house kiddy whampus and turned sidewalks? So I encourage all cities, and I do consulting for cities. I'm working in Prior Lake right now helping them on this very issue so otherwise you do not end up with what I refer to as an articulated lotting pattern. Having an articulated lotting pattern is better than tunnel vision on a street and when those are built and the canopies and the landscaping develops you go through and they're beautiful. I'm sure everybody here has seen projects that I call, what are plagiarized all the time by large national developers where the streets are straight. Everything's a postage stamp. Everything is in a grid pattern. There's no articulation in any of the lots. What we're doing here is adding articulation in a very critical point not only from the topography but from the land form that is there and I, regardless of our site I would strongly encourage the City to continue to promote flag lots because they're an asset and they make for a better neighborhood community. Aller: Thank you. Any additional comments or discussion on the matter before us? We've got several things. With regard to infill I think we have to balance the infill and the difficulty of infill with the fact that a property owner has the right to try and attempt to get the value of his property and we as a city have to represent them as well as the neighbors that were there before and I think that balancing is what we're looking for. At least that's what I'm looking for and I'm seeing that so far in the ability to work with the City and the efforts that have been made in going through the process. The fact that our denial or granting would kill the project really doesn't have an impact on me. I'm looking at the project to see whether it's beneficial for the neighborhood and what do we get by granting the variance as opposed to looking for a reason to deny it and I think we gain the opportunity to have a better water rate and flow and stormwater system and as a result of that I'm easily swayed by the fact that I think it's a reasonable use of the property and I think that's what we should look at in making our determination so I'll be voting in favor. Weick: If I could ask for clarification on what we are, what we will be voting on? It feels like there's 3 things. So there's the rezoning. Aanenson: Correct. Hokkanen: Right. Weick: And we do have a, that's something that we're voting on. 27 Chanhassen Planning Commission — May 17, 2016 Aanenson: Correct. Weick: There's the variances. Aanenson: Correct. Weick: And then there's the actual preliminary plat approval for 12 lots. Aanenson: Correct. Weick: Okay. Aller: Did you want to discuss any of those 3 issues? Weick: I would. You know I guess, and I appreciate your comments. I would, this is very difficult. I'm very sensitive, like you are to the ability to, for homeowners to develop their land. That's absolutely, you know we should be supporting that. I don't have any issue with any of the variances actually. I don't have an issue with rezoning the property to single family residential. I do, as a matter of what I'm trying to do is figure out how the preliminary plat for the 12 lots, and I can't reconcile some of the significant issues that I see with the approval. So the approval of the preliminary plat and sorry for jumping around but you know it has to meet the subdivision regulations and the zoning ordinance so I read that and I tried to find, I tried to make sure that we meet the zoning ordinance and the subdivision regulations. To me there's 3 significant issues that this property is dealing with. One is the canopy or the tree coverage. It's significant to me. I don't think it can be remedied. I don't think that should necessarily stop the subdivision but to, we can't correct that to the point of getting to the city regulation I don't think. I think we're too far off there so I think that's a significant issue. I think the hard cover, and I know that's something that I guess deal with further, further through the process but based on flag lots and based on the way things are configured I'm significantly concerned about hard cover and I have not been, although attempts to reassure us that the mitigation of the drainage will be easy, I don't see that and I certainly don't see it in the report. It feels anything but easy so I think there's 3 issues that we're really dealing with and that the residents around are dealing with and so when you look at the conditions of the zoning ordinance, for instance condition on page, well it's 1 but, you know number 4, letter e. The proposed use can be accommodated with existing public services and will not over burden the city service capacity. I think we heard about sewage being an issue. We heard about drainage being an issue. In 5(c), the physical characteristics of the site including but not limited to topography, soil, vegetation, susceptibility to erosion siltation, susceptibility to flooding and stormwater drainage are suitable for the proposed development. I am not convinced of that. 5(d), the proposed subdivision makes adequate provision for water supply, storm basins, same kind of thing. I'm not convinced. And then G(1) is the same. It deals with drainage so, and then you know we can overcome that if you follow in 6. I don't believe the hardship is a mere inconvenience so I don't think that's met and I don't believe that 28 Chanhassen Planning Commission — May 17, 2016 the granting of a variance of the plat would, would not be substantially detrimental to the neighborhood basically paraphrasing what 6(d) says. So when I really try and take some of the emotion out of it and what people are trying to do with their land and what neighbors I think what I'm hearing are trying to accomplish as well, based on the facts that I see here, I don't think we meet the conditions for the preliminary plat and for that reason I would not vote for this. That's my, thank you. Alley: Okay, any other comments? Hokkanen: I want to thank Steve for kind of breaking that down because I similarly agree with almost everything you know without getting into details. Some of the conditions. If they could be met or they will be met that's different and we assume that they will because it'd be a condition but I'm a little torn on this as well. Weick: And we've dealt with these issues before but they've been more singular. Just as these start to add up to me, we have big issues on this property and I'm not sure we're ready with the current plan. I really appreciate that we've gone through multiple plans but just because we tried hard in my opinion doesn't mean we necessarily got there. Hokkanen: Close. Aller: Anything? Tietz: I just comment on the tree thing. I think that can be dealt with Steve. I think the 45 plus or minus trees after the fact, kind of like my comment earlier about banking trees and then the developer's responsible for bringing them as the development evolves I think could be very appropriately done and really add great value to the neighborhood if they're placed strategically and give homeowners an option of the type of tree and where they want them placed and then planted appropriately so I'm not as concerned about that. I think the big issue is just confirming the stormwater and the drainage. You know the number of lots does bother me but I understand the situation and obviously economics come into play. I'd like to see 9 foot retaining walls eliminated instead of hard 90 degree edges at the comer of the property that you know somehow kind of fits better. I can't change that so. Weick: One of the, you know in sitting through a lot of these we talk about after the fact like with hard cover or with trees. You know we look at the lot and we say well, the house is there and you can't put a tree within 10 feet of the house and the street is 15 feet from that and so the area to put a tree is very small and to that I would say that's our fault because there was a tree there and we decided to put a house there. A big house, right? A three quarter to a million dollar house or whatever it is and we built it in such a way, we approved it in such a way that the only area to put a tree was 6 square feet and we put a tree there and so I would argue to say that could it be done? Yes but we create a condition that makes it so difficult that I just question creating that condition. That's where I'm hung up and yeah. 29 Chanhassen Planning Commission — May 17, 2016 Aller: I look at this as an ongoing process because even though we're making decisions today it's to the preliminary plat. It's not to a final plat. It's not to the building permit. It's not to the contracts that are going to be entered into with the City so I look at the direction that we're going and as you know I'm a water guy. I want to know where it's going and how much is going there and I want to preserve it as well as the trees to the extent possible but I think when we're looking at the process here we're looking at conditions that are being placed upon them if we move this forward that we have to rely on the fact that we're going to follow through and get them done, and if they don't meet the requirements for hard cover then it's not going to be built. Weick: True. Hokkanen: Correct. I think this discussion is good to bring up these points. That they are important to us so moving forward the conditions can be met. Aller: And that it's not the final decision. Hokkanen: Correct. Aller: And that they, when I look at these things I also look at the extent to which the developer has been working with the staff and working with the community, not just because it goes through iterations of plans. I would think everybody would be happy if we could hit the mark on the first plan every time but the fact that they go through that process in making the sausage so to speak, you're going to come out with a better product and the fact that they go through it again and again and we have these discussions again and again and they listen to the community and to the impact that the community statements had on them is something that I take into consideration and I feel more comfortable with when I look at are our conditions going to be met. And with the number of trees versus houses I just, it's a difficult thing because how are we to determine how many trees a person should have on it's lot? Weick: Agreed. Aller: And where do you replace the house, the home that somebody wants to build on a lot versus the fact that they may not want trees. They want a house so we try to balance that the best we can. And the fact that we require it and that it goes through the process with the requirement we'll end up with I believe a better product in the end, and they might be smaller trees. They might not be huge oaks but they'll be overstory and they'll help again my thing with water is that overstory trees are the best thing that we can do. It's our initial defense to runoff. Weick: I would say if we believe this iteration provides the room down the road you know to make the changes necessary to meet some of the requirements then I can see where, I can see approving it. Chanhassen Planning Commission — May 17, 2016 Alter: And I think, but I think that that's what you need to decide. Weick: Right. Alter: How you're going to vote on it. Weick: I agree. Yeah. Alter: Personal viewpoint and whether or not, you know I'm not here to sell you. If you have any other questions for staff or anything let's get it out in the open and build a record. Aanenson: And I don't know if you saw it but part of our discussion in going back to the retaining walls is you know having a walkout versus a rambler on some of those lots would also change whether or not you need a retaining wall so there are other choices which we've pointed out in our staff report too. Generous:... stormwater runoff. Aanenson: Some of it, yes. Tietz: And those lots, what 7 and 8 or those two, they have to come around an 80 degree bend. Aanenson: Right, that's true. Alter: And that's also grading and elevation. Tietz: Right. Aanenson: They're changing the elevation for a lookout right. Tietz: Bring those up? Aanenson: Right. So we pointed that out in the staff report. Tietz: Yeah I noticed that. Alter: Sir. Terry Forbord: Commissioner Alter, members of the Planning Commission, Terry Forbord. Those are excellent questions that both Commissioner, is it Weick? Weick: Weick. 31 Chanhassen Planning Commission — May 17, 2016 Terry Forbord: Weick and Hokkanen brought up. Here's the saving grace. Number one, on the record I give you my utmost commitment to continue working with the staff and a best in class professional scenario that we have enjoyed over the last 5 months. But here's the saving grace for the City. All the issues that you brought up mean that you have to have an incredible staff to take care of each and every one of those and the good news is you do and you've witnessed it before. As Commissioner Aller just, you took the words out of my mouth moments ago. Advancing this forward as recommended by the staff, the city staff, to the City Council and working through to the final design and ultimately the final approval at the City Council where all the rubber ends at meeting the road including the developer's agreement and everything else, all those issues that were just brought up by you I am absolutely confident that your city staff and city attorney will take care of those issues and you need not worry about them. I'm glad that you bring them up because they're very critical and I give you my commitment that we will work with the staff to accomplish all of those criteria. Thank you. Aller: Thank you. Any other comments or? Hokkanen: No, ready for a motion. Aller: I'll entertain a motion as anyone deems fit. It could be any motion. It can be to table. It can be to deny. It can be to grant. Yusuf: Can I just ask one question? Where do we stand on this one? The remaining 4 conditions of approval that were. Aanenson: That's just their comments to our, those conditions are, they're refuting those or have some additional comments on it. We're sticking by our conditions in the staff report. Yusuf: Okay that's what I just didn't hear the staff's feedback on that. Aanenson: Correct. We're not in concurrence on those. Aller: We haven't heard a motion to change or modify those conditions. Yusuf: Just want to confirm since the motion that we'll be making will be the original conditions of approval. Aanenson: Right or the Chair says, we forward those as part of the record as this goes up to City Council. Yusuf: Okay. Aller: Were you about to make a motion? 32 Chanhassen Planning Commission — May 17, 2016 Yusuf. I can very well do it. Aller: Thank you. Yusuf. The Chanhassen Planning Commission recommends that City Council approve rezoning of the property from Rural Residential (RR) to Single Family Residential (RSF) and preliminary plat approval for 12 lots, one outlot and public right-of-way with variances for the use of flag lots, cul-de-sac bubble size, and the local street centerline offset of less than 300 feet and a building setback variance from the cul-de-sac bubble for Lot 11 subject to the conditions of approval and adopts the Findings of Fact and Recommendation. Aller: So I have a motion by Commissioner Yusuf. Do I have a second? Madsen: Second. Aller: Having a motion by Commissioner Yusuf and seconded by Commissioner Madsen, any further discussion? Yusuf moved, Madsen seconded that the Chanhassen Planning Commission recommends that City Council approve rezoning of the property from Rural Residential (RR) to Single Family Residential (RSF) and preliminary plat approval for 12 lots, one outlot and public right-of-way with variances for the use of flag lots, cul-de-sac bubble size, and the local street centerline offset of less than 300 feet and a building setback variance from the cul-de- sac bubble for Lot 11, plans prepared by Stantec dated 5/6/2016, subject to the following conditions of approval and adopts the Findings of Fact and Recommendation: Building: 1. Provide a 1:200 "clean" plat drawing. 2. Demolition permits required for the removal of any existing structures. 3. Buildings may be required to be designed by an architect and/or engineer as determined by the Building Official. 4. A final grading plan and soils report must be submitted to the Inspections Division before permits can be issued. 5. Retaining walls over four feet high require a permit and must be designed by a professional engineer. 6. Each lot must be provided with separate sewer and water services. km Chanhassen Planning Commission — May 17, 2016 7. The applicant and or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. Engineering: 1. The applicant shall include a chart with the maximum hardcover allowed on each lot. 2. The lots shall be graded to drain away from proposed building locations. 3. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: Lot 6 backyard, Lot 7 backyard, the east side of Lot 1, the highpoint of the side yard of Lot 10. 4. The grading plan shall be revised to show a spot elevation at the centerline of each driveway where it meets Street A. 5. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9. 6. The applicant shall identify the discharge point of the culvert shown on the existing topography near the existing driveway of 1600 Lake Lucy Road. If it is a driveway culvert, the applicant shall have it removed or bulkhead and abandoned. 7. The plans shall identify the areas intended for stockpiling materials on site during construction. 8. Top and bottom wall elevations shall be shown for the retaining wall on the eastern property line of Lot 9. 9. Any retaining wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA). 10. The development plans shall call out the material of the retaining wall. The following materials are prohibited for retaining wall construction: smooth face, poured in place concrete (stamped or patterned is acceptable), masonry, railroad ties and timber. 11. Boulder walls shall not be taller than six feet. 12. The applicant shall have their surveyor confirm all easements and right of way shown with a recent title survey before final plat. 34 Chanhassen Planning Commission — May 17, 2016 13. Easements over drainage swales, basins and storm water pipes shall be called out as "Drainage and Utility" easements. 14. Retaining walls and an entry monument are proposed within City easements. These element shall be relocated outside of the standard perimeter drainage and utility easement boundaries, expecting the retaining wall on Lots 5 and 6. 15. The retaining wall on Lots 5 and 6 requires an encroachment agreement. 16. The preliminary plat shows a signage easement on Lot 1. This shall be a paper easement between Lot 1 and the development's HOA. 17. The applicant shall name Street A with coordination with the Fire Marshall prior to submittal for final plat review. 18. The applicant shall include the horizontal alignment tabulation for Street A in the plans. 19. The developer shall show construction limits for utility work below Yosemite Ave and submit a staging and restoration plan with their final plat submittal. 20. A street light shall be installed at the intersection of Street A and Yosemite Avenue. 21. Driveways shall be shown on the plan in the final plat submittal. 22. Driveways shall be designed to meet all standards in City Code §20-1122. 23. The sidewalk does not continue north of Street A, therefore the pedestrian ramp shall not be constructed at the intersection of Street A and Yosemite Avenue. 24. The pedestrian ramp on the northwest comer of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. 25. The sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. T 26. The portion of the sanitary services that lies within the right-of-way shall be gravity -flowing. 27. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 28. SMH 5 shall be moved to be centered between the building pads for Lots 5 and 6. 29. The sanitary services within the cul-de-sac bubble shall be revised to eliminate bends and cleanouts within the right-of-way. «7 Chanhassen Planning Commission — May 17, 2016 30. The utility plan sheet shall be revised to call out the City of Chanhassen as the local authority in Note 13. 31. The plans shall call out C900 material for the water main pipe. 32. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 33. Two additional hydrants shall be installed, one at the intersection of Street A and Yosemite Avenue and one at Station 3+00 of Street A. 34. Water and sewer partial hook-ups are due at the time of final plat. The partial hook-up fees will be assessed at the rate in effect at that time. Environmental Resources: 1. A revised tree preservation plan and calculations must be submitted to the city prior to final approval. 2. All required plantings must be located on private property outside of public right-of-way. The landscape plan shall be changed to reflect this requirement. 3. Ash trees shall be removed within the proposed tree preservation area. Removals shall be directed by the city. 4. A revised landscape plan with a detailed plant schedule listing quantities for each individual species shall be submitted to the city before final approval. 5. The proposed tree preservation area in the northeast corner of the development shall be incorporated into outlot including wetlands. Fire: 1. Proposed street name will be submitted by the applicant to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval. 2. Two addition fire hydrants will be required: one at the south/west corner of Yosemite and Street "A" and the second one on the south side of street "A" by Sta.3+00. 3. A three-foot clear space shall be maintained around fire hydrants. 4. Street sign(s) (temporary allowed) shall be installed prior to building permits being issued. Fire Marshal must approve signage. 36 Chanhassen Planning Commission — May 17, 2016 5. Prior to combustible home construction fire apparatus access roads capable of supporting the weight of fire apparatus shall be made serviceable. 6. An addition address number will be required for lot #9. Its location shall be at the entrance of the private driveway. Sign location and size must be approved by the Fire Marshal. 7. Prior to combustible construction fire hydrants shall be made serviceable. 8. No burning permits will be issued for tree/ brush removal. Parks: l . Full park dedication fees for 10 lots shall be collected per city ordinance in lieu of requiring parkland dedication. 2. Dedication of a 20-foot wide trail and a utility and drainage easement between lot 7 and lot 8. 3. Planning, engineering, and construction per city standards of an 8-foot wide bituminous trail within this easement connecting public Street "A" and Pheasant Hill Park. 4. Relocation of the public sidewalk to the south side of Street "A". Planning 1. The front lot lines for lots 5 shall be the north property line, for lots 8 and 9 the east lot lines. 2. The entry monument may not be located within the right-of-way and must be located outside of the sight triangle. A sign easement shall be dedicated where the monument sign will be located. Water Resources: 1. Runoff rates and volumes cannot be increased to the south. 2. Curve numbers and drainage areas shall accurately reflect pre and post -construction conditions. 3. The stormwater management practices shall achieve a new overall reduction of at least 90% for total suspended solids and 60% for total phosphorous using industry accepted removal rates. This includes manipulation of the NURP50 Particle Distribution. 37 Chanhassen Planning Commission — May 17, 2016 4. The sump manhole and SAFL Baffle shall not be included in the P8 model as the P8 model already assumes pretreatment. 5. All sumps with SAFL baffles shall be a minimum of 3 feet in depth. 6. The applicant shall prepare and submit a Surface Water Pollution Prevention Plan that contains all required elements from Parts III and IV of the NPDES/SDS Construction Permit. This shall be a standalone document. 7. Any disturbance of the buffer areas shall be restored with native vegetation appropriate to the area and the plans shall note this and the seed mix to be used. 8. A plan shall be prepared showing the placement of wetland buffer monuments. 9. All buffer monuments shall be installed prior to the sale of any lots. 10. All stormwater practices shall be place into a drainage and utility easement if not included in an outlot. 11. All drainage swales shall be included in drainage and utility easements and the development shall make any future builder and homeowner aware that these may not be altered without submittal of a revised grading plan to the city and subsequent approval of that revised plan. 12. The development contract shall include language indicating that the Homeowners' Association shall be responsible for any landscaping work associated with the biofiltration feature and the city shall maintain the associated infrastructure including the underdrain, the filtration media and the piped storm sewer conveyance system. 13. The south biofiltration feature shall have a skimmer emergency overflow structure designed and installed. 14. A detailed plan of the filtration basins, consistent with the MN Stormwater Manual shall be submitted with the final plat submittal for review and approval by city staff. It shall include, at a minimum, a plan view, a profile view, all necessary elevations, any in situ soil preparation, methodologies to be employed to protect from construction traffic, soil filter media specifications, any plantings and any appurtenant work to be done. 15. Underdrains and drain tile shall have tracer wire and cleanouts. 16. Pretreatment shall be required for all filtration basins receiving piped discharge. 17. A forebay, surge basin or other approved energy dissipation device shall be provided for the inlet into the biofiltration feature included in the outlot. The selected practice must not create undue maintenance burdens. The end result shall be non -erosive velocities into the basin. 18. Efforts shall be made to raise the elevations of Lots 2 through 5 to assure positive flow towards the street and ultimately to the treatment devices. 38 Chanhassen Planning Commission — May 17, 2016 19. The applicant, their consultant and city staff shall collaborate to minimize drainage concerns in the back and side yards of lots 6 through 10. 20. Storm Water Utility Connection charges due at the final plat are estimated to be $58,880.00. All voted in favor except for Commissioner Weick who opposed and the motion carried with a vote of 5 to 1. Aanenson: Just for clarification again this item does go to the City Council and that's scheduled for June 13"' if anybody's tracking this item. Aller: Correct and so any individual at home or present that wants to see the materials that we've been looking at again they're on the website in the City. Please feel free to investigate them. Pull them up. We've tried to build a good record of the comments before us for the City Council to look at and contemplate on June 13, 2016. Thank you. Terry Forbord: Mr. Chair, members of the Planning Commission. Thank you very much for your time, your commitment, and your service to the community and your review of this complicated application. We greatly appreciate it. Aller: Thank you sir. Okay we'll move onto the second item on the agenda tonight. PUBLIC HEARING: 4060 LAKERIDGE ROAD, WETLAND ALTERATION PERMIT: REOUEST FOR INSTALLATION OF TEMPORARY DOCK AT 4060 LAKERIDGE ROAD EXCELSIOR (LOT 4. BLOCK 1, HIGHLANDS ON LAKE ST. JOE). APPLICANT/ OWNER: BRIAN LANG. Spreiter: Thank you Chairman Aller and commissioners. As stated this is the public hearing for the wetland alteration permit at 4060 Lakeridge Road. 4060 Lakeridge Road is located on the south side of Lake St. Joe within the, sorry I'm blanking on the neighborhood. Within the Highlands of Lake St. Joe neighborhood. The applicant is requesting a wetland alteration permit to construct a temporary dock on Lake St. Joe to utilize the lake for recreational purposes. This is the existing site and the location of the proposed dock overlooking Lake St. Joe. The applicant is requesting a wetland alteration permit in order construct a 3'/2wide wood dock extending approximately 95 feet into the wetland to an accessible lake depth of approximately 4 feet. This is the approximate dock location in relation to the wetland boundary. The dock would be mainly located where it is primarily cattails and in a semi -permanent or permanently flooded area. The wetland boundary is over here. There's a slight slope that goes, well probably a 3 to 1 slope actually that goes down from the property to the wetland boundary. The dock that is constructed or would be constructed would have to allow water to free flow underneath it. The approximate impact as a result of the dock is approximately 19 square feet. That's a result of the posts that are to be installed with the dock. This is, this meets the no loss criteria under the Minnesota Wetland Conservation Act. The De Minimis criteria. Within there are certain maximum impacts 9] CHANHASSEN PLANNING COMMISSION REGULAR MEETING SUMMARY MINUTES APRIL 19, 2016 Chairman Alter called the meeting to order at 7:00 p.m. MEMBERS PRESENT: Andrew Aller, Mark Undestad, John Tietz, Nancy Madsen, and Lisa Hokkanen MEMBERS ABSENT: Steve Weick, and Maryam Yusuf STAFF PRESENT: Kate Aanenson, Community Development Director; Bob Generous, Senior Planner; Alyson Fauske, Assistant City Engineer; and Terry Jeffery, Water Resources Coordinator OATHS OF OFFICE: Andrew Aller and Nancy Madsen recited the oaths of office. ADOPTION OF PLANNING COMMISSION BYLAWS. Commissioner Tietz moved, Commissioner Hokkanen seconded to adopt the Planning Commission Bylaws as presented. All voted in favor and the motion carried unanimously with a vote of 5 to 0. ELECTION OF CHAIR AND VICE CHAIR Commissioner Undestad nominated Andrew Alter as Chairman of the Planning Commission. All voted in favor and the motion carried unanimously with a vote of 5 to 0. Commissioner Undestad nominated Steve Weick as Vice Chairman of the Planning Commission. All voted in favor and the motion carried unanimously with a vote of 5 to 0. 445 WEST 79Tn STREET, CHICK-FIL-A: SITE PLAN REVIEW WITH VARIANCES TO CONSTRUCT A 4,775 SQUARE FOOT RESTAURANT ON 1.32 ACRES OF PROPERTY ZONED HIGHWAY AND BUSINESS SERVICES DISTRICT (BHl AND LOCATED AT 445 WEST 79Tn STREET, CHICK-FIL-A. APPLICANT: CHICK-FH.-A INC. OWNER: CHANHASSEN SHOPPES. LLC. Bob Generous presented the staff report on this item. Commissioner Tietz asked for clarification on the number of parking stalls above what's required. Representing Chick-fil-A, Project Manager Joe Vavrina with HR Green discussed findings from the traffic study. Chairman Aller asked the applicant to speak to the number of parking stalls, traffic impacts to the Holiday, stormwater drainage, and the trash enclosure before opening the public hearing. No one spoke and the public hearing was closed. Planning Commission Summary — April 19, 2016 Hokkanen moved, Madsen seconded that the Chanhassen Planning Commission recommends City Council approve the site plan for a 4,775 square foot, one story building with a drive-thru and a variance for hard surface coverage, plans prepared by HR Green, Inc., dated 02/23/16 and subject to the following conditions and adopts the Findings of Fact and Recommendation: Building: I. The building is required to have an automatic fire extinguishing system. 2. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 3. Retaining walls over four high must be designed by a professional engineer and a permit must be obtained prior to construction. 4. Sanitary and storm sewer service must comply with Minnesota State Plumbing Code (see Table 701.1). 5. Detailed occupancy related requirements will be addressed when complete building plans are submitted. 6. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. Engineering: 1. Several proposed items are shown within the city's drainage and utility easement, including: both retaining walls, clearance bar post for the drive-thru and the Chick-fil-A monument sign. These items must be moved out of the easement or the applicant must enter into an encroachment agreement with the city after, but concurrent to the site plan agreement. 2. An additional drainage and utility easement shall be recorded over the two drainage basins located south of the parking lot. 3. Staff has requested further analysis to include the Market Boulevard intersection. 4. The applicant's engineer shall also examine ways to mitigate the queueing and decreased LOS. 5. The applicant shall and re -stripe the intersection of W 79'b Street & Great Plains Boulevard to provide a longer left turn queue. 6. The applicant's engineer shall verify whether an adequate sight line is provided for vehicles exiting via the eastern site access. 7. The applicant shall follow the accessibility code for the construction as well as all applicable State and Federal laws. 8. The applicant shall coordinate with city staff prior to removal or construction of the services regarding inspection and traffic control on W 79a' Street. 9. Once construction is complete, the applicant shall retain ownership of the proposed sanitary service, water service and hydrant constructed on this property. Planning: 1. The applicant shall combine the two parcels as one lot. 2 Planning Commission Summary — April 19, 2016 2. The applicant shall enter into a site plan agreement with the City and provide the necessary security to guarantee erosion control, site restoration and landscaping. 3. Wall lighting and the trash enclosure lighting shall comply with city code. 4. The proposed monument sign shall be relocated on the site to comply with city code. 5. Signage shall comply with city code and requires separate sign permits for each sign. 6. The applicant shall reduce the drive-thru entry width to one lane to add a landscape peninsula in the southwest corner of the building and to expand the patio area. 7. The applicant shall investigate the shortening of the service sidewalk connecting the building to the parking lot. 8. The applicant shall provide enhanced landscaping to the north of the building. Landscaping: 1. The applicant shall revise the landscape plan to accommodate more of the required bufferyard trees in the south and east buffer yard areas. 2. The interior width of all landscape island must a minimum of 10 feet. 3. The 8" oak tree located on plans along the southeast property line must be preserved. Revised landscape plans shall note the tree as saved. 4. The London plane tree and Norway maple listed in the Plant Schedule shall be replaced with appropriate species from the city's Approved Tree List. Water Resources: I. The applicant shall consider modifications to site grading, catch basin placement or both to minimise to the maximum extent practicable, the amount of runoff leaving the site to the west. 2. Sheet C-3.1 the two swales/basin areas shown on the southern property boundary shall be stabilized as soon as possible after going on-line but no more than 48 hours afterwards. 3. The applicant shall do additional subsurface exploration/investigation to provide more substantial evidence that the infiltration system will work as modeled. The method of exploration/investigation shall be left to the applicant and their engineer's discretion. In the event the findings indicate that infiltration is not feasible, stormwater management plans shall be modified accordingly. 4. The Stormtech system shall be owned and maintained by the property owner. 5. A drainage and utility easement shall be recorded over the Stormtech system and the two basins located south of the parking lot. 6. The design shall be modified to prevent the wall from experiencing inundation. In the event this is not possible, the D&U shall clearly state that the retaining wall is the sole responsibility of the property owner. 7. The applicant shall prepare an operations and maintenance manual which shall include a schedule of inspection as well as anticipated routine maintenance to maintain performance in perpetuity or until such a time as all parties agree it is no longer necessary. This document Planning Commission Summary — April 19, 2016 shall include persons responsible for inspections and maintenance and shall be recorded against the property. 8. The city or their representative shall be granted rights to come onto the property during and after construction to inspect the facility. 9. Inspection reports and maintenance records shall be made available to the City within 30 days of receiving a written request. 10. The applicant must evaluate the conveyance downstream to assure adequate capacity exists. 11. The model shall be modified to include the area that drains into ST-41 and the area that drains into ST-6 as basins. 12. Additional detail is needed for the Stormtech system to fully evaluate its efficacy. These items include elevation of chambers, interconnection between chambers for evaluation of short circuiting of the system, and elevation of the stone. 13. The applicant shall be responsible for all other agency permits such as MPCA, RPBCWD, MN DOT, MNDOT, et al. 14. It is estimated that $19,997.34 in stormwater connection fees will be due at lot consolidation. All voted in favor and the motion carried unanimously with a vote of 5 to 0. APPROVAL OF MINUTES: Commissioner Madsen noted the verbatim and summary Minutes of the Planning Commission meeting dated March 15, 2016 as presented. COMMISSION PRESENTATIONS. Commissioner Hokkanen informed the commission of her resignation from the Planning Commission on June I' because she is moving out of the city. ADMINISTRATIVE PRESENTATIONS. Chairman Aller discussed the open house being held on April 28th from 4:00 to 6:00 p.m. in the council chambers regarding planned improvements to Highway 5. Kate Aanenson discussed action taken by the City Council at their March 28`s meeting, new businesses and sign pemrits issued, and the future schedule for Planning Commission agenda items. Undestad moved, Madsen seconded to adjourn the meeting. All voted in favor and the motion carried unanimously with a vote of 5 to 0. The Planning Commission meeting was adjourned at 7:45 p.m. Submitted by Kate Aanenson Community Development Director Prepared by Nano Opheim 4 CHANHASSEN PLANNING COMMISSION REGULAR MEETING APRIL 19, 2016 Chairman Alter called the meeting to order at 7:00 p.m. MEMBERS PRESENT: Andrew Aller, Mark Undestad, John Tietz, Nancy Madsen, and Lisa Hokkanen MEMBERS ABSENT: Steve Weick, and Maryam Yusuf STAFF PRESENT: Kate Aanenson, Community Development Director, Bob Generous, Senior Planner; Alyson Fauske, Assistant City Engineer; and Terry Jeffery, Water Resources Coordinator OATHS OF OFFICE: Andrew Aller and Nancy Madsen recited the oaths of office. ADOPTION OF PLANNING COMMISSION BYLAWS. Commissioner Tietz moved, Commissioner Hokkanen seconded to adopt the Planning Commission Bylaws as presented. All voted in favor and the motion carried unanimously with a vote of 5 to 0. ELECTION OF CHAIR AND VICE CHAIR. Commissioner Undestad nominated Andrew Aller as Chairman of the Planning Commission. All voted in favor and the motion carried unanimously with a vote of 5 to 0. Commissioner Undestad nominated Steve Weick as Vice Chairman of the Planning Commission. All voted in favor and the motion carried unanimously with a vote of 5 to 0. 445 WEST 79Tn STREET, CHICK-FIL-A: SITE PLAN REVIEW WITH VARIANCES TO CONSTRUCT A 4,775 SQUARE FOOT RESTAURANT ON 1.32 ACRES OF PROPERTY ZONED HIGHWAY AND BUSINESS SERVICES DISTRICT BHl AND LOCATED AT 445 WEST 79Tn STREET, CHICK -FIFA. APPLICANT: CHICK-FHrA INC. OWNER: CHANHASSEN SHOPPES, LLC. Generous: Thank you Chairman Aller, commissioners. As you stated before us is planning case with site plan review with a variance for the hard cover on the property. It's located at 445 West 79`" Street. Project name is Chick-fil-A. Tonight we have the Planning Commission meeting. The public hearing. On May 9'h this will go before City Council for final determination. The applicant is Chick -fill -A Inc and the owner of the property is Chanhassen Shoppes LLC. This property is located at the northwest corner of Highway 5 and Great Plains Boulevard. The existing building on site is on one lot. There's a little extension to the southeast that the City currently owns. There's a purchase agreement in place to sell that to the property owner and Chanhassen Planning Commission —April 19, 2016 create one bigger lot. Previously on this site there was Prairie House restaurant and then after that the current commercial center, a 10,000 square foot multi tenant building was built in 1996 and now they're proposed to remove the existing building and put in a separate structure for Chick-fil-A. The property is zoned Highway and Business Services District (BH) which permits, it's really oriented to vehicular access type uses. It permits almost, the most commercial uses that we have in all our zoning districts. The property is guided for commercial uses. The zoning and land use are consistent with each other. Access to the property is via West 79t' Street on the north side. There's no direct access to either Great Plains Boulevard or Highway 5. On the west side of this property there's a joint access with the Chanhassen Inn and that will remain in place throughout this development. Again the request is for a site plan review approval for the construction of a one story restaurant building with a drive thru facility. It's about 4,775 square feet. The variance is for hard cover. They're requesting an increase from 65 percent which is permitted under the zoning ordinance to 77.5. We have proposed some revisions to the plan that reduce that but not a lot. It's still over 77 percent and we'll get into that later. And we'll address the variance first. Again they're requesting 77.5 percent hard cover. This property, the BH district provides for highway commercial development type uses and so it's really designed for vehicular uses. This is the most vehicular use if you had a drive thru restaurant on a commercial property. It has great visibility to the highway. Easy access. The joint access with the property on the west is part of the problem for hard cover maintenance. Generally we see perimeter landscaping where the properties can make up for their green space. In this case they can't. I took a 10 foot strip at 280 feet on the west side and that's why I came up that they lose at least 2,800 square feet of green space or pervious surfaces. They're trying to redevelop a site that currently exceeds the hard cover. It's at 81.9 percent now so that is over, the resulting percentage hard cover will be less than currently exists but they also have a slightly bigger property so the net result is it's about a wash between the proposed hard cover and what they have now. However we believe that it is a reasonable use of the property. They are trying, they're meeting all the city code requirements for green space. For parking lot landscaping. Perimeter landscaping and they have made some modifications that will, like I said reduce the amount from 77.5 to and I believe Joe may have the final number. They're still working on that. They're making some corrections. They'll go through that. Here's the site plan. It has some of the revisions. Originally the drive thru for the, had two drive lanes coming into it and so in this case you see that we had them reduce it down to one. They were able to pick up this comer for some landscaped area. It's potentially I don't know I have to ask Alyson if they can reduce the radius on this curve and add a little more green space. They were able to expand this patio area which was at one time it was limited to straight across here so it becomes a better functioning area for people to congregate and eat their food. Drive thru continues. We're also looking at trying to shorten up this sidewalk by at least a panel, maybe two if we can shift it to the west slightly and so they pick up some more green space. This is the area that they're purchasing from the City so that was just basically for the drive thru. It does represent a significant portion of their green space. We also are working with them to make sure all their landscape islands are at least 10 feet interior diameter. Interior dimensions of pervious surface so we have areas there. I was in some preliminary talks with Terry to see if it was possible if their proposed stormwater system doesn't work if we can use some of these landscape islands to provide a rain garden type 2 Chanhassen Planning Commission —April 19, 2016 area. That water from the parking lot that could flow directly into them and that's something we'll continue to look at. Again I just tried to highlight all the landscape areas in this. Again we are looking at expanding all the islands to meet the 10 feet interior dimension between, behind the curb. The perimeter on the east side is primary green space and then along the north property line. 'They're working there. As part of our review they are short a few trees and they have some trees that aren't really acclimated for this area so we recommend that they make some changes. There is an 8 inch oak that's right on this property line up here and it's just south of the Holiday and they will be preserving that in place so we will be receiving the revised landscape plans as they go forward showing that that will remain. Oh the stormwater system is underground here. We're seeing that a lot because there's not a lot of green area that they can. The concern is with the downstream system from this. That it is under sized and it won't accommodate additional stormwater runoff and so currently they have to meet the 1.1 inch of retention on site and so we're working with them to verify that their system will actually work. They need some additional information regarding the water table out there and then the calculations for the actual system. They will meet it. It's just how eventually it's done is may be modified as we go forward and get additional information. The building is, basically it's a two tone building. I sort of, we tried to design it to make it look like there's two components to it. Brick is the primary material and let's see I'll go to the overhead cam. The primary brick color is that red, the reddish brown brick on the left side. I can't even remember the name. Red velour is what they call it and then the other one is beige colored brick and that's primarily the entrance area and the eastern end of the building. They have dark bronze anodized window framing and also the coping at the top of the window and then also they have, we've had them incorporate metal canopies over the windows so all these darken areas represent canopies. These flat areas are also canopies but they're those flat projecting ones. They don't come down or up and so we see a lot of that in the new construction. These are actually functional canopies so they'll help in the summer months to reduce some of the heat into the building and that's one, it also provides additional architectural interest to those elevations. Okay each of these windows, these are actual metal canopies over the windows. The flat ones are over the entrance areas and the service doors so you'll see this is on the west end of the building. This is the west elevation. It's what you would see as you were coming down Highway 5 from the west. This is the south elevation. Here's north elevation. There's not, these are faux windows in here. This one is on the north end. It has a canopy. It's faux window also so this is a service area within the building and this is the east elevation as you're coming west on Highway 5 what you would see. Signage is composed, well it's permissible on 3 elevations. They're not using it on the north side of the building so they're using it on their main entrances which is on the west side. Right here above the main entry on the Highway 5 side. And then also on the Great Plains side of the building and that, we didn't do a review for compliance with city ordinance but that's a condition of approval that they have to meet the requirements under the BH district regulations for size. Lighting is proposed throughout the development. They have, they meet all the requirements in the parking lot. On the roof they do have one spotlight and I've been advised that that's to light the United States of America flag which is permitted under city ordinance so otherwise they have downcast lighting around the building. It's little sconces. As part of our review we want to make sure that they don't have, it's all downcast so it doesn't shine up and that again is a condition of approval. 3 Chanhassen Planning Commission — April 19, 2016 Here's the interior layout of the building. This is the north side up here. South, west and east of course and these are more service areas along on the south. Northeast comer of the building. There is a little play area in the southeast corner of the building. The patio area would be on, along the south side here. As a part of our review we requested that the applicant perform a traffic study of the area. Specifically at West 79t° Street and Great Plains Boulevard but then we also looked at it at Market Boulevard. Their engineer will talk about this more in the future. As always left turns are where we have problems with traffic circulation and so I'll let him get into that. It's currently an F. It will remain an F and eastbound West 79`s Street and Great Plains Boulevard unless we get different traffic patterns in the community. And again I'll let their engineer discuss that further. I think that's what that. Staff is recommending approval of the site plan with the variance for the hard cover subject to the conditions in the staff report and adoption of the Findings of Fact and Recommendation. With that I'd be happy to answer any questions. Aller: Anyone have any questions at this point in time of staff? Tietz: Yes. Aller: Commissioner Tietz. Tietz: Yeah Bob. Can you help clarify, there's code requires 60 stalls and they're putting in 72 stalls. What's, help me, help clarify what's driving that? Is that their analysis of traffic and what they think the facility's going to drive? Generous: Commissioner Tietz, yes. Basically it's their operating standard. They're looking for at least 70 stalls. With the modifications we're talking about I believe they may lose a couple so they'll be below that 73. Tietz: Because if they met code they'd have no problem meeting the coverage I don't think if you eliminated 12 stalls. Aanenson: That's correct. There was a lot of discussion on that when we fast met with them so we asked to see their analytics from other stores that they've built in the metro area what they used and that's what they determined. They gave us kind of their peak hours. What their biggest demand is. What they would need for that. Because it's tight parking in there right now, you have the Holiday and then ultimately we believe the other property's going to get redeveloped too. Tietz: The motel or the inn? Aanenson: Correct. Some day in the future. Tietz: Yeah. 4 Chanhassen Planning Commission —April 19, 2016 Aanenson: It's over 30 years in it's life cycle there so we did spend a lot of time with them on that. That was a big issue for them. I guess the perspective we took right now it's solid asphalt. There's no trees or anything in there. It was built to a different standard so because we were moving towards getting compliance and doing the underground stormwater treatment which isn't there right now, that was our position but you're right. If they dropped those stalls they could meet the requirement. Tietz: With a shared road Kate for entry is there any potential in the future that as that site to the west gets redeveloped that there is potentially a shared parking? Aanenson: Yes. I think that's what we could look at if it's offset demand just like we have down at the Villages on the Pond or we have actually in the Dinner Theater district. We actually have a nice matrix there looking at what peak demands are there so because we don't know what that use is going to be. We've had some interesting thoughts there that would drive up parking so yes. We always try to look at shared and that's something we might want to put in the standards too especially they're usually not open on Sundays so that might be something too that we might make a condition. That's a good point. Tietz: Thank you. Aller: Any further discussion at this time? Any questions? Okay, we'll have the applicant step forward if he'd like to make a presentation and please state your name for the record. Joe Vavrina: Sure my name is Joe Vavrina with HR Green. Project manager for the project. Aller: Welcome. Joe Vavrina: And I'm hereto represent Cluck-fil-A. Thank you for entertaining our proposal tonight. I figured I'd jump right into traffic. I know Bob had mentioned that there would be further discussion on that so I put together this quick overall exhibit to kind of highlight the area that we looked at. This area in here is the Chick-fil-A. Where the Chick-fil-A will be built and the two intersections that were looked at which was Great Plains and 79m and then Market and 79`s which is over here on this side. See if we can get that all in the picture maybe. So working with staff there was initial concern that on the intersection of Great Plains and 79th there's some back up potentially today with the eastbound left turns on 79th going northbound to Great Plains so we went out and did a traffic study on that intersection specifically to start. Looked at the peak hours. Both the midday as well as the pm peak during the week as well as Saturday during lunch hours. We determined, we went out and did counts between 11:00 and 1:00 during the week, 4:00 and 6:00 during the evening hours, and 11:00 and 2:00 on Saturdays. We determined the peaks were between 11:15 and 12:15 during the week. The pm peak was between 5:00 and 6:00 and then on Saturday it was between 11:30 and 12:30. So looking at those specific hours we developed the level of service analysis and queue determinations for the intersections in all the legs so the first item that we wanted to look at was the northbound left on Great Plains so that Chanhassen Planning Commission —April 19, 2016 would be this movement as you turn onto Great Plains to make the left into 79's. We wanted to make sure that there was no back up that would occur onto Highway 5. In the analysis that we looked at there was no level of service drop. It remained at, I believe it was an A which is the best level of service you can possibly get. Again there is no stop control on Great Plains in either the north or south bound directions so it's pretty much a free flow into 79'b. We then looked at all the other legs and really the leg that, you know as Bob had mentioned earlier that currently fails today is the eastbound left on 79' going northbound Great Plains. As the Chick-fil-A would develop it would concurrently remain to be an F so we looked at things that we could do to help mitigate that to help and improve the situation out there. We also looked at you know how does the traffic distribute coming into the Chick-fil-A and going out of the Chick-fil-A which is really going to be two different percentages. As traffic approaches we looked at an 85/15 split where 85 percent of the traffic comes from the east. From Highway 5 up through Great Plains and into the development and the other 15 would come from Market Boulevard down 791s and then into the development. From an existing perspective, again this is just during the peak, that percentage changes knowing that human nature is going to look at and see if there is a back up at this left turn lane at Great Plains, they're going to go to Market Boulevard because they know that hey there's alternate ways to get in and out of this area and they will take an alternate means to get out so the exiting distribution was a 65/35 where 65 would go out to Great Plains and then back to 5, or north and the other 35 would go to Market Boulevard. We looked at the level of service impacts at Market Boulevard as well and thanks to the City they provided, or staff provided us some counts they had recently done at Market Boulevard to help us understand how that intersection would operate today and in the future and really the only impact in movement was the westbound left onto Market. Currently today that operates at a level of service E and after development it would go to an F but it's marginally right at the E to F so right now it's a high E and when the Chick-fil-A goes to a very low F. It's like a 2 second difference as far as the time delay so in our opinion it's a negligible impact on Market. The improvements or recommendations that we came up with in the study to again help mitigate you know some of what's going on at the Great Plains intersection was to restripe this median here to extend it and create a longer left turn bay and storage. That would provide additional area for cars that are trying to make that left out. Room to stack so that they don't block the right, the right through combo. That is something that Chick-fil-A has committed to do if everyone deems to be acceptable. And then the other thing would be to possibly add some informational signage on site for those that aren't familiar with the area. That are visiting the site. Just passing through that if this access point appears to be congested that they could use the Market Boulevard access point as an alternate means to either go north or to get back to Highway 5. It's a challenging intersection being at Great Plains and 70. It's you know within 250 foot of Highway 5. You know a lot of the things that us as engineers use to help solve some of the traffic issues such as stop control, signals wouldn't work in this situation because it would create more of an issue to Highway 5 and back traffic up into Highway 5 so unfortunately we can't go with any of those solutions that we typically would look at and really are limited to the things that we can do out there. The restripe for the left turn lane makes sense. Provides additional storage. I think in the, with the proposed development we would fit all the vehicles in that peak hour which was 95 percentile that we looked at which was worst case scenario which doesn't happen every day. I 31 Chanhassen Planning Commission — April 19, 2016 was just out there tonight and there was nobody making a left turn out of there at 5:30 so I mean again it's the worst case scenario but in that event if we were to restripe this we could fit all those left turn movements in that and keep that right through open so that we don't back any traffic up into there to make it a little bit more safer so I guess with that I'll open up the questions on the traffic study itself. I know that's a big component of this proposal. Be happy to answer any other questions as it relates to the Chick-fil-A building. The site. Real quick I will add to the question on the number of parks. The 70 stalls that we have is, actually I think as Bob had mentioned we are, we have reduced it down and this plan here incorporates some of the changes that Bob was alluding to earlier with widening out the landscape islands to get that 10 foot back to back for here, here, here and actually that one's a little bit wider than 10 so we lost 2 spaces in the mix so right now we're at 71 stalls from where we originally proposed. Typically in this market you know we look to get at least a minimum of 70. That's what we've seen in this market that we need to operate. Anything less than that we start to bust at the seams if you will and we don't want to get in situations where people are parking in other areas that we don't have the ability to park in so that's the reasoning behind the increase of stalls that we are proposing. And then I guess a real quick blip on the building. This building here that we're proposing is a custom building so it, you will not find another one in Minnesota or in the Midwest quite honestly. The closest one that we've done this in is Omaha, Nebraska and it fits this site very well because it's a very odd shaped site and it's not very rectangular to fit some of our other prototypes so this will definitely be a very particular building for this site. Aanenson: Planning Commission just wanted you to know that the original application design we asked for changes so. And they complied with that so very appreciative of that. Aller: Great. Any questions at this point? I'm going to ask, the 70 is that in the game plan for you as a typical business plan model to also include your employees or expected employees? Joe Vavrina: That's correct. Aller: So we don't have to worry about employee parking. Joe Vavrina: Correct, that includes them. Aller: And did you take a look at the potential impact on the Holiday if the restriping is done for purposes of ingress and egress on their 2 driveways? Joe Vavrina: As far as access to them? Aller: Right. Joe Vavrina: Absolutely. Let me go back to that exhibit. Aller: What that potential impact might be. Chanhassen Planning Commission — April 19, 2016 Joe Vavrina: So as it's currently striped today with the outer stripe and the inner stripe and then the diagonal stripes inbetween, technically that's supposed to be, you're not supposed to cross that. Aller: Right. Joe Vavrina: It's aright-in/right-out. That's the way it's striped. Legally it's you know these entrances are technically right-in/right-out. Obviously everybody uses that. They enter that. It's not enforced. If we were to extend the left turn storage bay my thought would be if no one's in the storage bay people are still going to continue to make that movement. If, and if you get into a situation where this is full and somebody needed to get into here you know they could always go past and make a U turn and come in which again and this is not a preferred option but they could do that. That pavement out there is wide enough to make that. It's almost 36 feet wide so they could make a U turn to get back to the gas station if they had to and again we're talking worst case scenario. Peak hour which is for a small period of time. Aller: And then water disposal, what's the potential if you know at this point for that to not only meet but to be able to avoid having downstream impact based on the stormwater drainage? Joe Vavrina: Sure. So right now what we're looking at is the underground system as Bob had mentioned and really you know the thing that we need to clarify and get some more information from our geotechnical engineer is you know where the ceiling high ground water actually ends up and is that, the area that we're going to put the cell is that inundated with ground water. If it is then our solution that we currently have is going to be challenged because it's kind of hard to store the water if there's already water in there from ground water so we may have to look at alternate solutions but if we can show that the ground water is lower than that you know the solution would be is that we're going to store the 1.1 inches. Infiltrate that into the ground and then everything else will flow beyond. You know the intent is that our discharge that we, that leaves the site will be at or less than what it is today so we will improve the situation. We're definitely not going to make it worst. We will do some additional modeling to verify some of the additional work that we're doing out here in the right-of-way. Some of the drainage swales that we're putting in that you know there's not a negative impact on that storm sewer that goes under Highway 5. Aller: Great. And then trash bins or trash, refuse what are we using? Joe Vavrina: Excuse me. Aller: Where's the trash bins? Joe Vavrina: Right here at the top of the site. Chanhassen Planning Commission — April 19, 2016 Aller: So easy access in and out? Joe Vavrina: Yes, for the garbage truck. Aller: And it's got good coverage so it's protected. Joe Vavrina: Yes. Aanenson: It will be similar to what like Taco Bell has. Their's are up against West 78th Street. Aller: Any additional questions? Thank you sir. Joe Vavrina: Thank you. Aller: Okay. I haven't led off with my usual spiel so I'll kind of go through that real quick. We are a representative body recommending to the City Council for approval on these items and this item if approved would go to the City Council for final action and after we have the presentations as we just have had from staff and the applicant we open up the matter for public input so I will do that at this time. If anyone wishing to speak for or against the item before us tonight wishes to come forward they can do so. Please come forward. State your name and address for the record. Seeing no one come forward I will close the public hearing and open it up for commissioner comment. Comment? Thanks to staff for putting together such a great package. It's very complete. For those of you at home that don't have it in front of you, you can have access to all our Minutes and the packages that come before us on our city website so feel free to take a look at the packages as they progress through planning and City Council. I don't have any additional questions or comments. I think it looks like they've done a good job in working with planning and coming up with something that appears to work for the site very well. I look forward to seeing a building that Chanhassen that no one else in Minnesota or the country might have so with that. Tietz: The new prototype. Good package. Aller: Any additional? Tietz: Well done. Aller: I'll entertain a motion. Hokkanen: I'll make a motion the Chanhassen Planning Commission recommends City Council approve the site plan with variance for hard surface coverage subject to the conditions of approval and adopts the Findings of Fact and Recommendation. Aller: I have a motion. Do I have a second? Chanhassen Planning Commission — April 19, 2016 Madsen: Second. Aller: Having a motion from Commissioner Hokkanen and a second from Commissioner Madsen, any further discussion? Hokkanen moved, Madsen seconded that the Chanhassen Planning Commission recommends City Council approve the site plan for a 4,775 square foot, one story building with a drive-thru and a variance for hard surface coverage, plans prepared by HR Green, Inc., dated 02/23/16 and subject to the following conditions and adopts the Findings of Fact and Recommendation: Building: 1. The building is required to have an automatic fire extinguishing system. 2. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 3. Retaining walls over four high must be designed by a professional engineer and a permit must be obtained prior to construction. 4. Sanitary and storm sewer service must comply with Minnesota State Plumbing Code (see Table 701.1). 5. Detailed occupancy related requirements will be addressed when complete building plans are submitted. 6. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. Engineering: 1. Several proposed items are shown within the city's drainage and utility easement, including: both retaining walls, clearance bar post for the drive-thru and the Chick-fil-A monument sign. These items must be moved out of the easement or the applicant must enter into an encroachment agreement with the city after, but concurrent to the site plan agreement. 2. An additional drainage and utility easement shall be recorded over the two drainage basins located south of the parking lot. 3. Staff has requested further analysis to include the Market Boulevard intersection. 4. The applicant's engineer shall also examine ways to mitigate the queueing and decreased LOS. 5. The applicant shall and re -stripe the intersection of W 79'" Street & Great Plains Boulevard to provide a longer left turn queue. 6. The applicant's engineer shall verify whether an adequate sight line is provided for vehicles exiting via the eastern site access. 7. The applicant shall follow the accessibility code for the construction as well as all applicable State and Federal laws. 8. The applicant shall coordinate with city staff prior to removal or construction of the services regarding inspection and traffic control on W 79's Street. 10 Chanhassen Planning Commission — April 19, 2016 9. Once construction is complete, the applicant shall retain ownership of the proposed sanitary service, water service and hydrant constructed on this property. Planning: 1. The applicant shall combine the two parcels as one lot. 2. The applicant shall enter into a site plan agreement with the City and provide the necessary security to guarantee erosion control, site restoration and landscaping. 3. Wall lighting and the trash enclosure lighting shall comply with city code. 4. The proposed monument sign shall be relocated on the site to comply with city code. 5. Signage shall comply with city code and requires separate sign permits for each sign. 6. The applicant shall reduce the drive-thru entry width to one lane to add a landscape peninsula in the southwest corner of the building and to expand the patio area. 7. The applicant shall investigate the shortening of the service sidewalk connecting the building to the parking lot. 8. The applicant shall provide enhanced landscaping to the north of the building. Landscaping: 1. The applicant shall revise the landscape plan to accommodate more of the required bufferyard trees in the south and east buffer yard areas. 2. The interior width of all landscape island must a minimum of 10 feet. 3. The 8" oak tree located on plans along the southeast property line must be preserved. Revised landscape plans shall note the tree as saved. 4. The London plane tree and Norway maple listed in the Plant Schedule shall be replaced with appropriate species from the city's Approved Tree List. Water Resources: 1. The applicant shall consider modifications to site grading, catch basin placement or both to minimize to the maximum extent practicable, the amount of runoff leaving the site to the west. 2. Sheet C-3.1 the two swales/basin areas shown on the southern property boundary shall be stabilized as soon as possible after going on-line but no more than 48 hours afterwards. 3. The applicant shall do additional subsurface exploration/investigation to provide more substantial evidence that the infiltration system will work as modeled. The method of exploration/investigation shall be left to the applicant and their engineer's discretion. In the event the findings indicate that infiltration is not feasible, stormwater management plans shall be modified accordingly. 4. The Stormtech system shall be owned and maintained by the property owner. 5. A drainage and utility easement shall be recorded over the Stormtech system and the two basins located south of the parking lot. 11 Chanhassen Planning Commission —April 19, 2016 6. The design shall be modified to prevent the wall from experiencing inundation. In the event this is not possible, the D&U shall clearly state that the retaining wall is the sole responsibility of the property owner. 7. The applicant shall prepare an operations and maintenance manual which shall include a schedule of inspection as well as anticipated routine maintenance to maintain performance in perpetuity or until such a time as all parties agree it is no longer necessary. This document shall include persons responsible for inspections and maintenance and shall be recorded against the property. 8. The city or their representative shall be granted rights to come onto the property during and after construction to inspect the facility. 9. Inspection reports and maintenance records shall be made available to the City within 30 days of receiving a written request. 10. The applicant must evaluate the conveyance downstream to assure adequate capacity exists. I I. The model shall be modified to include the area that drains into ST41 and the area that drains into ST-6 as basins. 12. Additional detail is needed for the Stormtech system to fully evaluate its efficacy. These items include elevation of chambers, interconnection between chambers for evaluation of short circuiting of the system, and elevation of the stone. 13. The applicant shall be responsible for all other agency permits such as MPCA, RPBCWD, MN DOT, MNDOT, et al. 14. It is estimated that $19,997.34 in stormwater connection fees will be due at lot consolidation. All voted in favor and the motion carried unanimously with a vote of 5 to 0. Aanenson: I know you stated that but just a reminder then this goes to the council on May 0. Aller: Great, that's what I was looking for. Aanenson: Yeah, if anybody. Aller: Yes so this will go to the City Council Monday, May 9, 2016 for final action. APPROVAL OF MINUTES: Commissioner Madsen noted the verbatim and summary Minutes of the Planning Commission dated March 15, 2016 as presented. COMMISSION PRESENTATIONS. Aller: Any announcements by the commissioners? Aanenson: Ms. Hokkanen do you have an announcement? Hokkanen: I have to tender my resignation as of June I'. We will be moving out of Chanhassen. Very sad to leave after 21 years. It's a step for my family. IV) Chanhassen Planning Commission —April 19, 2016 Aller: We all appreciate the fact that in those 21 years you've done a lot for the city and it's residents both in your professional capacity as a realtor but your personal input and being here in the community as an individual and then certainly last but not least your service here on the Planning Commission. Using your expertise to a great advantage for the betterment of all of Chanhassen so we really thank you. Hokkanen: It's been my privilege. Aller: And wish you the best of luck and we'll see you on Highway 5. Hokkanen: I still work in Chanhassen. Aanenson: That's right. We'll get you for another meeting or two yet but yep. ADIVIINISTRATIVE PRESENTATIONS. Aller: And were we going to cover the open house for Highway 5 at all in our update? Aanenson: Yes. Just talk about a couple other things. Yes. I mean that's, Highway 5 open house. 41 open house? What? Aller: The Highway 5 and Chanhassen, the right turn acceleration lane, public open house next Thursday, April 28th from 4:00 to 6:00 p.m. here at the Chanhassen council chambers so if you want to get details of the project and ask questions of the project staff that will be right here on April 28 h from 4:00 to 6:00 and they'll talk about adding the acceleration between both junctions of Highway 101. Replacing the traffic signal at Great Plains Boulevard with the flashing yellow arrows and replacing the pedi trail between Highway 100, Dakota Avenue and Great Plains Boulevard. Aanenson: Yeah I don't know if Alyson wants to add anything. Fauske: Commissioner Aller you provided some great information. This project is headed by MnDOT and so staff requested that MnDOT hold an open house for those that would be impacted. There will be a closure of Market Boulevard but they've been limited as to the time that they can have Market Boulevard closed to accommodate those movements. And as you stated the improvements are for some acceleration lanes along Highway 5 that they like to get in before the Ryder Cup comes into, goes into Chaska. Aller: So hopefully a good safety improvement for that intersection. Fauske: Correct. 13 Chanhassen Planning Commission —April 19, 2016 Aller: Any additional City Council action updates? Aanenson: I have a couple things. On March 20 the City Council did discuss the stable permit for a miniature pony... Sorry, I said pony. It's a miniature horse. Aller: Mini horse. Aanenson: They're different things. Then some businesses... Jersey Mike's is going next to Noodles so if you look at what the Chick-fil-A looks like, they mimic some of the same features that are on that building for Noodles and now Jersey Mike's... and bakery is going in on West 79'b Street. ...we do have a subdivisions coming in on Lake Lucy Road... Then on May 17'h there's some things going out there but none of those came in but I believe you will have a wetland alteration permit on that meeting. Terry Jeffery will be handling and then some of those other things ... we're not sure where Wilson Nursery stands but there's also a subdivision... I did want to let you know that the lifestyle center, it's coming in. They've given us a date and that will be on July 19'b. That will be concept. Again on that a concept is not legally binding but it is our job to kind of give them direction on where we see that going. The council will also be discussing this on their work session before... before the public hearing. After that there's a lot of environmental stuff that needs to be updated with the AUAR... give them some marching orders ... for probably 4 months or so while they work through those issues. I don't know if you know or not but the City's working on that west water treatment so there's meetings going on about that. I know Alyson's done some background work on that. Bob started working on the site plan approval... so they've got that scheduled to come before you to look at that and that's right off of Galpin. Galpin Boulevard and south of Sugarbush Park ... Lake Harrison. North of that. Then also I just want to remind you that tomorrow night we're having a visioning I know some of you will not be there. Others that are not here tonight will be there. That's with all the commissions and there will be, after that meeting there will be some take away so we'll be sure... The intent was to go through the work plan that we put together to talk about the Comprehensive Plan which will be our big push this year and next year and again because you hold all the public hearings, you're kind of the most, the vested in some of that process too so I'm looking for an exciting and I think it's good to get all of our commissions together too. To do some bonding there so I've put a lot on your plate these 2 weeks. Appreciate everybody going along and then we do have in August we're going to have the joint tour with the Environmental Commission and Park Commission too and I believe we've set that for, I want to say the 10'b and that's the normal commission. I'll get this on the schedule. I realized now I didn't have that on there so you can bookmark that so we'll think about what topics we want to look at. It might relate to the comp plan or not. We'll see what else. It might be the lifestyle center. Talk about some of the amenities down there. Things we're trying to preserve but Chairman that is all I had for kind of the administrative. Oh I'm sorry, I did pass out one other thing too and that was if anybody's interested in taking one of these classes let me know. I'll sign you up for that. Aller: Great, thank you. 14 Chanhassen Planning Commission —April 19, 2016 Aanenson: Yep. Aller: Okay I think we've run through the agenda for this evening. Aanenson: Except for Terry's open discussion here. Aller: Open discussion so we will go into a work session after we adjourn and at this point in time I'll entertain a motion to adjourn. Undestad moved, Madsen seconded to adjourn the meeting. All voted in favor and the motion carried unanimously with a vote of 5 to 0. The Planning Commission meeting was adjourned at 7:45 p.m. Submitted by Kate Aanenson Community Development Director Prepared by Nann Opheim 15 F - I City Council Action Update MONDAY Ayri125 2016 CITY COUNCIL MEETING: • Approved Mark Randall's Appointment to the Planning Commission MONDAY May 9 2016 CITY COUNCIL MEETING: • 445 WEST 79TH STREET — CIHCK FIL-A: Site Plan Review with Variances to construct a 4,775 square -foot restaurant on 1.32 acres of property zoned Highway and Business Services District (BH) and located at 445 West 79th Street. Applicant: Chick-fil-A Inc. Owner: Chanhassen Shoppes, LLC. Approved The minutes for this meeting can be viewed from the City's website. Go to www.ci.chanhassen.mn.us, and click on "Agendas and Minutes" from the left -side links. g:\plan\fm \city w mcil actim update.dm F-2 Future Planning Commission Agenda Items Schedule DATE ITEMS Work Session Items • Frontier Building Redevelopment -West 7811' Street Possible Future • 2040 Comprehensive Plan Items (Date . Seven Forty -One Sign Plan PUD Amendment Unknown) • Ordinance Amendment — Riley/Minnewashta — Slow No Wake - potential • 1891 Arboretum Boulevard Office/Industrial — potential • IDI Expansion and Parkin April 5 NO MEETING • Oaths of Office April 19 • Bylaws, Election of Officers May 9 CC • Chick-Fil-A, 445 West 791s Street • Stormwater ordinance, erosion control ordinance, floodplain ordinance April-80 7-8:30 30pm • 2040 Comprehensive Plan Visioning Activity (w/CC and all Sr. Center Commissions) April 6:00 m • Joint Meeting with the City Council May 3 May 23 CC • MEETING CANCELLED May 17 • Wetland Alteration Permit — Lake St. Joe June 13 CC • 1630 Lake Lucy Road - Subdivision with Variance & Rezoning • Foxwood - Wilson Nursery site - 9150 Great Plains Boulevard June 7 • 3627 Red Cedar Point Road— Variance June 27 CC • Oath of Office Mark Randall • 3801 Leslee Curve -. jariance - o v % `7to z • Buffer Ord • 8601 Great Plains Blvd - Rezoning, Subdivision, Site Plan — PUD and June 21 Variance July II CC • Moon Valley —IUP amendDment� d V&A . c -vv 9t�. July 5 • NO MEETING SCHEDULED July 19 August 8 CC • Lifestyle Center Au ust 2 • NO MEETING — NATIONAL NIGHT OUT ? August 10 • Joint Commissions Tour August 16 September 12 CC September 6 September 26 CC . West Water Treatment Plan — Approve Site Plan September 20 October 10 CC • Future Planning Commission Agenda Items Schedule DATE ffEMS October 4 October 24 CC • Authorize SWMP Distribution October 18 November 14 CC November I November 28 CC November 15 December 12 CC December 6 January 3 CC • (Tuesday) g:\agendesVc�f a,n, planning commission ag®da ft m Aocx 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone:952.227.1100 Fax:952.227.1110 Building Inspections Phone:952.227.1180 Fax:952.227.1190 Engineering Phone:952.227,1160 Fax: 952.227.1170 Finance Phone:952.227.1140 Fax: 952.227.1110 Park & Recreation Phone:952.227.1120 Fax:952.227.1110 Recreation Center 2310 Coulter Boulevard Phone:952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952,227.1130 Fax:952.2271110 I� u9 I -Ib MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Stephanie Smith, Project Engineer Bob Generous, Senior Planner Terry Jeffery, Water Resources Coordinator DATE: August 22, 2016 6k11___ SUBJ: Anthem on the Park Final Plat, Development Contract, and Plans & Specifications — Planning Case #2016-09 PROPOSED MOTION "The Chanhassen City Council approves: 1. The final plat for Anthem on the Park subject to the conditions of the staff report; 2. The development contract for Anthem on the Park; and 3. The plans and specifications for Anthem on the Park Approval requires a simple majority vote of City Council. PROPOSAL SUMMARY The applicants, Yosemite Holding, LLC, Almond & Carolyn Krueger and Craig & Deanna Claybaugh, are requesting final plat approval to create 12 lots, one outot, and right-of-way for public streets for the property located at the northwest comer of Lake Lucy Road and Yosemite Avenue. BACKGROUND On June 13, 2016, the Chanhassen City Council approved: Public Works 7901 Park Place Rezoning of the property from Rural Residential, RR, to Single -Family Phone:952.227.1300 Residential, RSF, and Fax:952.227.1310 Senior Center Preliminary plat approval for 12 lots, one outlot and public right-of-way with Phone: 952.227.1125 variances for the use of flag lots, cul-de-sac bubble size and a local street Fax:952.227.1110 centerline offset of less than 300 feet and a building setback variance from the cul-de-sac bubble for lot 11. Website www.ci.chanhassen.mn.us Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 2 SUBDIVISION REVIEW The applicant is creating 12 lots and one outlot from 8.96 acres. The plat will dedicate the right-of- way for portions of Lake Lucy Road, Yosemite Avenue, and Anthem Place. Outlot A contains wetlands and storm water ponds and will be dedicated to the city and preserved as permanent open space. RIGHT-OF-WAY AND EASEMENTS The survey included all easements and right of way shown on the title search of the property dated November 20, 2015 from Stewart Title Guarantee Company. The applicant shall have their survey confirm this with a recent title survey before recording final plat. The applicant proposes a 60-foot right-of-way over Anthem Place and 60-foot right-of-way radius over the cul-de-sac bubble. The plat maintains the existing, 66-foot right-of-way easements for Lake Lucy Road and Yosemite Avenue. The City Council approved a variance on the right-of-way for the cul-de-sac bubble to be decreased to 50 feet at Lot 11, Block 1. Staff recommends the applicant revise the plans to incorporate this variance and increase the size of the stormwater basin on the east side of Lot 12. The retaining wall on Lots 5 and 6 proposed within the drainage and utility easement requires an encroachment agreement. An entry monument is shown on Lot 1. This shall require a paper easement between Lot 1 and the HOA that shall be recorded prior to construction of the entry monument. The site plan shows an entry monument on Lot 1. This shall require an encroachment agreement between Lot 1 and the development's HOA to be recorded prior to construction of the entry monument. Per § 18-78, staff and the applicant examined providing future access for adjacent properties to the west, 1650 and 1670 Lake Lucy Road. However, it is uncertain how these properties would develop in the future and what type of legal encumbrance Lot 5 would require. Staff recommends 1650 and 1670 have access off of Lake Lucy Road when they develop in the future. GRADING Drainage Under existing conditions, the site is divided into two major drainage area. A line that extends approximately from the southeast property corner to 150 feet south of the northwest corner divides the drainage areas. Everything north and east of that divide drains to one of two wetlands and is ultimately directed to the east through a new culvert to be installed under Yosemite. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 3 Southern Drainage Area Everything south and west of this divide drains to the south towards Lake Lucy. The drainage leaves the site via a culvert that goes under Lake Lucy Road and discharges onto private property to the south. The drainage then either goes through a twelve inch (12") corrugated metal pipe culvert under the private driveway which leads to the island on Lake Lucy or portion of the drainage travels past the culvert and follows an incised ditch along the drive to a wetland located on private property. A second twelve -inch (12") CMP culvert goes under the same drive at this location and appears to equilibrate the wetland with another wetland on the other side of the drive. It appears the drive at this location is the low spot for the area and is prone to overtopping. Regardless of which path the drainage takes relative to the driveway; it all ends up in a third wetland with no constructed outlet although it appears that it does drain overland to Lake Lucy if it bounces approximately five (5) feet. None of this conveyance is under city easement nor does it appear designed to city standards. Staff has received email and voice correspondence from owners of four of the properties to the south that already receive runoff from the subject property. They all expressed great concern over directing Figure 1. Southern drainage route to Lake Lucy. additional runoff to the south. Staff agrees that the lack of easement and infrastructure makes it untenable to send any additional runoff to the south. These property owners should not bear responsibility for the stormwater management of the subject property. The development of this site must not direct any additional volume of runoff to the south. Further, rates must not be increased over existing rates for any scenario. The applicant must demonstrate to staffs satisfaction that this condition is met. The current plan iteration reduces the drainage area to the south by 1.07 acres. It is the consulting engineer's contention that the existing site conditions warrant a composite curve number (CN) of 79 and that even though the site CN increases to 85under developed conditions the total volume of decreases under each design event as shown in table 1 below. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 4 Table 1. Runoff Volume by Storm Event Pre- and Past -Development. EXISTING RUNOFF CN = 79 PROPOSED RUNOFF 2 YEAR 0.337 AF 0.324 AF 10 YEAR 0.674 AF 0.592 AF 100 YEAR 1.530 AF 1.237 AF There have been numerous studies showing that, after mass grading, a site will be more compacted than under current conditions. Mass graded sites intentionally compact soils to increase strength for paved areas and building pads. This increase in compaction leads to an increase in bulk density and a decrease in soil porosity. This translates into an increase in the volume of water running off the site. The submittal assumed that bulk densities would remain the same after completion of mass grading as they are under the current conditions. Without a soil management plan indicating how bulk density will be reduced after completion of grading, staff feels this assumption to be erroneous and the composite curve number post development will be significantly higher than under existing conditions. The applicant must provide a soil management plan indicating site -specific remediation of soil compaction and practices to improve tilth, soil organic content, and infiltration rates. The applicant must demonstrate that bulk densities are no greater than existing conditions by providing penetrometer data for current conditions and post development and comparing them to some reference such as the NRCS Soil Quality Institute's 1999 findings. If the bulk densities are found to be elevated post -development the developer would be responsible for correcting the soils. Cul-de-sac Drainage A low spot exists at the 3 o'clock position on the proposed cul-de-sac. It is staffs preference that this low spot be removed and that positive drainage take place toward the east. The applicant's engineer feels this is not practicable and instead proposed to install a sump manhole at this location to discharge water to the wetland buffer. Drainage of Lots 6-10 In an effort to force look outs onto these lots, several issues are created, including drainage issues. Both lot 7 and lot 8 have drainage shed directly at the structures. This is an unacceptable condition. Because of the swales necessary for conveying water out of the backyards, nearly the entire backyard of lots 6 and 9 will need to be under a drainage and utility easement. This will preclude almost any landscaping as that would have a strong likelihood of creating impoundment conditions on the upstream properties. If these lots were made into full basement units it is possible that less water would be directed south, that greater treatment could be achieved and the likely drainage issues could be avoided. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 5 Outlot Drainage The proposed biolfiltration feature has a 100-year high water elevation of 1008.11. It appears that this will bounce into lot 12. Given the nature of this facility, frozen conditions and sediment deposition will decrease the available pore space and can result in increased flood elevations. No emergency overflow has been provided and the plan view does not show the vertical or horizontal placement of the underdrain. The applicant will need to create an overflow between the northern wetland and the southeastern wetland. This must be stabilized and a vegetation restoration plan must be developed. The plans shall indicate that no wetland impacts, including but not limited to the placement of soils and the operation of equipment within the wetland can occur. In addition to the above discussion the following observations were also made pertaining to the grading and drainage plan: Lots 3, 4 and 5 on the southern half of the property show little level back yard area. This may be problematic for future owners of these lots as there is often an expectation to have a level backyard area for recreational use. The grading plan shall be revised to show a spot elevation at the centerline of the driveway where it meets Anthem Place. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 7 and 8. All draintile that crosses lot lines shall be owned and maintained by the HOA. Velocity dissipation shall be added to the plans for the draintile outlet on Lot 10. The erosion control plan shall be revised prior to construction, to require steel posts for all silt fence. Based on the building pads shown, the hardcover area generating stormwater runoff on Lots 1-4 and 6-10 exceed the 25% maximum without taking the driveways into account. Many greatly exceed 25% and go as high as 37% hardcover. The applicant shall include a chart with the maximum hardcover allowed on each lot. The lots shall be graded to drain away from proposed building locations. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: Lot 6 backyard, Lot 7 backyard, the east side of Lot 1, the highpoint of the side yard of Lot 10. The southern basin shows an Emergency Overflow (EOF) onto Lake Lucy Road, a collector roadway. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 6 To minimize additional stormwater runoff created by long driveways required for the "flag" or "neck" lot variance, the applicant's plans show proposed 10-foot driveways for the length of the "neck". The applicant shall identify the discharge point of the culvert shown on the existing topography near the existing driveway of 1600 Lake Lucy Road. If it is a driveway culvert, the applicant shall have it removed or bulkhead and abandoned. Erosion Prevention and Sediment Control The proposed development will exceed one (1) acre of disturbance and will, therefore, be subject to the General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit). The applicant has prepared a Surface Water Pollution Prevention Plan (SWPPP) and submitted it to the city for approval prior to final plat review and approval. The SWPPP must be updated to include additional required information after the contractor and subcontractors are selected. No earth disturbing activities may occur until the SWPPP is updated with all required information. This SWPPP shall be a standalone document consistent with the NPDES Construction Permit and shall contain all required elements as listed in Parts III and IV of the permit. The city has a checklist which they will make available to the consulting engineer. SITE CONSTRAINTS Wetland Protection The City of Chanhassen Wetland Inventory and the Minnehaha Creek Watershed Wetland Inventory both indicate the presence of two wetlands on the subject property. Sambatek reviewed and delineated the site in October of 2015. Staff reviewed and approved the delineation that same fall. The notice of decision was mailed on November 17, 2015. The applicant provided MNRAM and determined the northerly wetland to be manage classification 2 and the easterly wetland to be manage classification I requiring a 20 foot and 25-foot buffer respectively. Both wetlands require a 30 setback from the buffer for the principal structure. The plans show the appropriate buffers and setback. It is the City's practice to have wetlands and buffers placed into outlots to implement the no net loss goal. The city requires that all runoff is treated prior to discharge into a wetland. Treatment practices are being proposed for much of the drainage being directed to the wetlands. It is proposed that lots 8, 9 and 10 as well as the backs of lots 11 and 12 be treated via the wetland buffer. In those cases, where no other treatment opportunities are available filter strips may be utilized. The upland area between the two wetlands will need to be graded to allow for the bounce from the northern wetland to spill over into the eastern wetland. Work will also be required adjacent to the wetland area to install the outlet pipe under Yosemite. The SWPPP must address the potential for wetland impact and how impacts will be avoided. No materials or staging can occur Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 7 within the wetland area. Any disturbed area within the buffers must be revegetated with native vegetation and a vegetation establishment plan must be provided. Bluff Protection There are no bluffs on the property. Shoreland Management The property lies approximately 225 feet beyond the shoreland overlay district for Lake Lucy. As such it will not be subject to shoreland requirements for land development. F000dplain Overlay This property does not lie with a floodplain. RETAINING WALLS The applicant has proposed one new retaining wall as part of this subdivision. The retaining wall at the comer of Lots 5 and 6 is approximately 125 feet long and 6 feet tall. The sideyard of Lot 5 and the backyard of Lot 6 are below this wall. As this wall crosses lot lines, it shall be owned and maintained by a Homeowners Association (HOA). STREETS The applicant proposes construction of a public street, Anthem Place. Anthem Place is proposed as an approximately 1580-foot long cul-de-sac, which will be 31 feet wide and constructed using the Chanhassen Standard Detail typical section. The applicant shall include the horizontal alignment tabulation for Anthem Place in the plans prior to construction. Access to the subdivision from Anthem Place is located south of the southeastern wetland. This location was chosen after examining three locations: off of Lake Lucy Road, Yosemite Avenue north of the wetland, and Yosemite Avenue south of the wetland. The Lake Lucy Road intersection alternative was eliminated because of sight -distance concerns around the curve on Lake Lucy Road and the desire for access control on Lake Lucy Road, a Major Collector roadway. The Yosemite Avenue access north of the wetland was eliminated due to environmental concerns from running a roadway between the two wetlands across their EOF point and future maintenance concerns due to a long road extension that is surround by wetland instead of servicing properties. The proposed plan includes a variance to the requirement of 300-foot spacing between local roads per §18-57 which was approved by the City Council. The access location on Yosemite, south of the wetland reviewed using engineering discretion and the guidelines set forth in the 2030 Comprehensive, the proposed intersection offset seems reasonable as the proposed 12 lot subdivision would generate less traffic than a multiple commercial driveway. The applicant's engineer completed a queuing analysis to confirm that traffic queuing to make a left turn into the Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 8 proposed development would not affect the function of the Lake Lucy Road & Yosemite Avenue intersection. The developer shall show construction limits for utility work on Yosemite Ave and submit a staging and restoration plan prior to construction of the work on Yosemite Avenue. The profile alignment for Anthem Place shall be revised, prior to the start of construction, at Station 16+00, so that the vertical curve is a minimum of 144 feet in length, or otherwise adjusted to meet the City Code requirements § 18-27(h). DRIVEWAYS AND TRAILS Driveways shall be designed to meet all standards in City Code §20-1122. To minimize additional stormwater runoff created by long driveways required for the "flag" or "neck" lot variance, the applicant's plan proposes 10-foot driveways for the length of the "neck". The sidewalk does not continue north of Anthem Place, therefore the pedestrian ramp at the intersection of Anthem Place and Yosemite Avenue is not required. The pedestrian ramp on the northwest comer of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. SANITARY SEWER AND WATERMAIN Sanitary Sewer The applicant proposes an 8" PVC sanitary sewer main to be owned and maintained by the City, due to the elevation of the adjacent sanitary sewer system on the east side of Yosemite Avenue, sanitary sewer for this subdivision does not meet the minimum depth required without insulation. The sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. The sanitary services may also need insulation. The proposed shallow elevation of the sanitary sewer also necessitates Lot 1-4, 11, 12 to use a private, in -home grinder system to pump waste to the public sanitary main which is a gravity flow system. The portion of the grinder pump services that lies within the right-of-way shall be gravity -flowing. Per § 18-78, the applicant proposes to install sanitary sewer main to the western property boundary to provide future extension to the adjacent properties: 1650 and 1670 Lake Lucy Road. It is unlikely they would be able to connect a gravity system to the sanitary main extension and are expected to require private grinder pump systems. The retaining wall would need to be removed at the time of connection at the connecting party's expense. MH #4 shall be moved north to reduce the length of services for Lots 8, 9 and 10. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 9 Water Main The applicant proposes an 8" C900 water main system. Hydrants are proposed at the end of the cul-de-sac, the mid -length of Anthem Place, and at the intersection of Anthem Place and Yosemite Avenue. The plan shall be revised to move the hydrant at the intersection north of Anthem Place to stub watermain for a future connection to the north. STORM WATER MANAGEMENT Article VII, Chapter 19 of City Code describes the required storm water management development standards. Section 19-141 states that "these development standards shall be reflected in plans prepared by developers and/or project proposers in the design and layout of site plans, subdivisions and water management features." Storm Water Utility Connection Charges . These fees can be credited up to 50% if the design has a reasonable expectation of achieving abstraction of the first 1.1 inches of runoff from all proposed hardcover on the site. The wetland and buffer and upland area put into the outlot will be removed from the assessed property. This fee will be applied to the new lot of record being created. It is calculated as shown in the table below. ASSESSMENTS Water and sewer partial hook-ups are due at the time of final plat. The partial hook-up fees will be assessed at the rate in effect at that time. The remaining partial hook-ups fees are due with the building permit. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 10 COMPLIANCE TABLE Area (sq. ft.) Width (ft.) Depth (ft.) Hard Cover % / sq. & Notes Code 15,000 90 125 25 / 3,750 Lot 1 20,678 132 148 5,169 Street fivnta a on three sides Lot 2 16,063 92 177 4,015 Lot 3 18,538 90 206 4,634 Lot 4 24,712 95 235 6,178 Lot 5 25,795 30@ 218 6,449 Flag lot, area of neck excluded. Front lot line is north prop. line Lot 6 18,254 90 176 4,563 Lot 7 15,465 90 172 3,866 60 153 3,786 Fla lot, front lot line east 16,034 37 155 4,008 Fla lot, front lot line east 19,054 99 188 4,763 Wetland to east gLot815,146 19,002 161 209 4,750 Wetland to north 17,794 101 195 4,448 Wetlands north and east 78,893 Manage 1& 2 Wetland, Bio filter, 1.81 ac. ROW 80,316 1.844 ac. Total 390,563 8.96 acres @ 30 feet width for flag lots Setbacks: RSF: front-30-ft., side-10-ft., rear-30-ft., wetland buffer-20 ft., buffer setback-30 ft. Note there is a 20 ft. setback for Lot 11 from the cul-de-sac bubble. Hard Cover: 25% DEVELOPMENT CONTRACT The attached development contract incorporates the conditions of approval for the final plat and construction plans and specifications. A $766,414.30 financial security is required to guarantee compliance with the terms of the development contract relating to site grading, the installation of public streets and utilities, one-year of public street light operating costs, engineering, surveying, inspection, landscaping and topsoil. The cash fees for this project total $170,081.81. City funds are not needed as part of this private development project. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 11 PLANS & SPECIFICATIONS The applicant has also submitted detailed construction plans and specifications for staff review and City Council approval. Staff has reviewed the plans and specifications and finds the plans still need some minor modifications. Staff requests that the City Council grant staff the flexibility to administratively approve the plans after working with the applicant's engineer to modify the plans accordingly. The plans and specifications are available for review in the Engineering Department. REVIEW CONDITIONS OF APPROVAL Buildine: 1. Provide a 1:200 "clean" plat drawing. *This condition still applies. 2. Demolition permits required for the removal of any existing structures. *This condition still applies. 3. Buildings may be required to be designed by an architect and/or engineer as determined by the Building Official. *This condition still applies. 4. A final grading plan and soils report must be submitted to the Inspections Division before permits can be issued. *This condition still applies. 5. Retaining walls over four feet high require a permit and must be designed by a professional engineer. *This condition still applies. 6. Each lot must be provided with separate sewer and water services. *This condition still applies. 7. The applicant and or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. *This condition still applies. Engineering: 1. The applicant shall include a chart with the maximum hardcover allowed on each lot. *This condition has been met. 2. The lots shall be graded to drain away from proposed building locations. *This condition has been met. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 12 3. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: the east side of Lot 1, the highpoint of the side yard of be"-0-. *This condition has been modified. 4. The applicant shall revise lots 6-9 be a full -basement, rambler -style home. *This condition has been met. 5. The grading plan shall be revised to show a spot elevation at the centerline of each driveway where it meets Anthem Place prior to issuance of building permits. *This condition has been modified. 6. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9 prior to start of construction. *This condition has been modified. 7. The applicant shall identify the discharge point of the culvert shown on the existing topography near the existing driveway of 1600 Lake Lucy Road. If it is a driveway culvert, the applicant shall have it removed or bulkhead and abandoned. *This condition has been met. 8. The plans shall identify the areas intended for stockpiling materials on site during construction. *This condition has been met. 9. Top and bet4em wall elevatiens shall be shown for the r-etaining wall on the eastem prepefty line „fret n :xxxc-m--no�T *This condition no longer applies. 10. Any retaining wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA) per an HOA covenant to be recorded prior to issuance of any building permit for Lots 1-12, Block 1. *This condition has been modified. 11. The development plans shall call out the material of the retaining wall. The following materials are prohibited for retaining wall construction: smooth face, poured in place concrete (stamped or patterned is acceptable), masonry, railroad ties and timber. *This condition has been met. 12. Boulder walls shall not be taller than six feet. *This condition has been met. 13. The applicant shall have their surveyor confirm all easements and right of way shown with a recent title survey before final plat documents are recorded. *This condition has been modified. Todd Gerhardt Anthem on the Park Final Plat - Planning Case 2016-09 August 22, 2016 Page 13 14. Easements over drainage swales, basins and storm water pipes shall be called out as "Drainage and Utility" easements. *This condition has been met. 15. Retaining wells and an entFy ineffumefA are proposed within City easem-ents. These elements sha4l be Feleeated eutside of the standard perimeter drainage and utility easemew boundaries; expeeting the retaining wall on Lots S And- 6. *This condition no longer applies. 16. The retaining wall on Lots 5 and 6 requires an encroachment agreement to be recorded with the final plat. *This condition has been modified. 17. An entry monument is shown on Lot 1. This shall require a paper easement between Lot 1 and the HOA that shall be recorded prior to construction of the entry monument. *This condition has been modified. 18. The applicant shall name Anthem Place with coordination with the Fire Marshall prior to submittal for final plat review. *This condition has met. 19. The applicant shall include the horizontal alignment tabulation for Anthem Place in the plans. *This condition has been modified. 20. The developer shall show construction limits for utility work below Yosemite Ave and submit a staging and restoration prior to the start of utility construction. *This condition has been modified. 21. The plan shall be revised to install a street light at the intersection of Anthem Place and Yosemite Avenue. *This condition has been modified and met. 22. Driveway grades shall be shown on the plan in the final plat submittal. *This condition has been modified and met. 23. Driveways shall be designed to meet all standards in City Code §20-1122. *This condition still applies. 24. The sidewa4k does not eontifma nafth of Anthem Plaee, therefore the pedestrian Famp shall net be eenstmeted M the intefsee4ien of Anthem Plaee and Yosemite Avenue. *This condition no longer applies. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 14 25. The pedestrian ramp on the northwest corner of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. The plan shall be revised to include the replacement prior to the start of construction. *This condition still applies. 26. The plan shall be revised to note that sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. *This condition has been modified and met. 27. The portion of the sanitary services that lies within the right-of-way shall be gravity -flowing. *This condition still applies. engineer shall veFify this when the utility profiles afe drafted. *This condition no longer applies. 29. SMH 5 shall be moved to be centered between the building pads for Lots 5 and 6. *This condition has been met. 30. The sanitafy sepviees within the eul do sae bubble shall he;w' 4ad to eliminate bends and eleafieutsyAthin the ri& of way. MH #4 shall be moved north to shorten the length of services for Lots 8, 9 and 10. *This condition has been modified. 31. The utility plan sheet shall be revised to call out the City of Chanhassen as the local authority in Note 13. *This condition has been met. 32. The plans shall call out C900 material for the water main pipe. *This condition has been met. 33. The sanitary sewer/water main crossing on Lot I may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. *This condition no longer applies. 34. Two additional hydrants shall be installed, one at the intersection of Anthem Place and Yosemite Avenue and one at Station 3+00 of Anthem Place. *This condition has been met. 35. Water and sewer partial hook-ups are due at the time of final plat. The partial hook-up fees will be assessed at the rate in effect at that time. *This condition still applies. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 15 Based on review of the construction plans, staff recommends that the following conditions be added: 36. If the entry monument is to be built on City -owned Outlot A, the developer shall enter into an encroachment agreement with the City, prior to construction of the monument. 37. The plan shall be revised prior to the start of construction to provide velocity dissipation for the draintile outlet on Lot 10. 38. The plan shall be revised, prior to the start of construction, to move the yard drain on Lot 9 to the bottom of the swale. 39. The HOA shall own and maintain any draintile that crosses property lines. This shall be included in the HOA covenant documents to be recorded prior to issuance of any building permit for Lots 1-12, Block 1. 40. Lots 1-12, Block 1 shall be under the same Homeowners Association the covenants of which shall be recorded prior to issuance of any building permit for Lots 1-12, Block 1. 41. The existing survey shall call out existing structures that are not used as residents as "structures" rather than "houses". This shall be revised prior to start of construction. 42. The erosion control plan be revised prior to construction, to require steel posts for all silt fence. 43. The profile alignment for Anthem Place shall be revised, prior to the start of construction, at Sta 16+00, so that the vertical curve is a minimum of 144 feet in length, or otherwise adjusted to meet the City Code requirements §18-27(h). 44. The plan shall be revised, prior to the start of construction, to move the hydrant at Anthem Place and Yosemite Avenue to the north side of Anthem Place so as to provide a stub for future watermain connection to the north. Environmental Resources: A revised tree preservation plan and calculations must be submitted to the city prior to final approval. *This condition has been met. 2. All required plantings must be located on private property outside of public right-of-way. The landscape plan shall be changed to reflect this requirement. *This condition has been met. Ash trees shall be removed within the proposed tree preservation area. Removals shall be directed by the city. Reforestation trees may be located within Outlot. *This condition has been modified. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 16 4. A revised landscape plan with a detailed plant schedule listing quantities for each individual species shall be submitted to the city before final approval. *This condition has been met. 5. The proposed tree preservation area in the northeast comer of the development shall be incorporated into outlot including wetlands. *This condition has been met. Based on review of the final plat plans, staff is recommending that the following condition be added: Colorado spruce and pin oak selections shall be replaced with species suitable for the area. Fire: 1. Proposed street name will be submitted by the applicant to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval. *This condition has been meet. Anthem Place is acceptable. 2. Two addition fire hydrants will be required: one at the south/west corner of Yosemite and Street "A" and the second one on the south side of street "A" by Sta.3+00. *This condition has been met. 3. A three-foot clear space shall be maintained around fire hydrants. *This condition still applies. 4. Street sign(s) (temporary allowed) shall be installed prior to building permits being issued. Fire Marshal must approve signage. *This condition still applies. 5. Prior to combustible home construction fire apparatus access roads capable of supporting the weight of fire apparatus shall be made serviceable. *This condition still applies. 6. An addition address number will be required for lot #9. Its location shall be at the entrance of the private driveway. Sign location and size must be approved by the Fire Marshal. *This condition still applies. 7. Prior to combustible construction fire hydrants shall be made serviceable. *This condition still applies. 8. No burning permits will be issued for tree/ brush removal. *This condition still applies. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 17 Parks: 1. Full park dedication fees for 10 lots shall be collected per city ordinance in lieu of requiring parkland dedication. *This condition still applies. 2. Dedication of a 20-foot wide trail and a utility and drainage easement between lot 7 and lot 8. *This condition still applies. 3. Planning, engineering, and construction per city standards of an 8-foot wide bituminous trail within this easement connecting public Street "A" and Pheasant Hill Park. *This condition still applies. 4. Relocation of the public sidewalk to the south side of Street "A". *This condition has been met. Plannine: 1. The front lot lines for lots 5 shall be the north property line, for lots 8 and 9 the east lot lines. *This condition still applies. 2. The entry monument may not be located within the right-of-way and must be located outside of the sight triangle. A sign easement shall be dedicated where the monument sign will be located. *This condition still applies. Water Resources: 1. Runoff rates and volumes cannot be increased to the south. *This condition still applies. 2. Curve numbers and drainage areas shall accurately reflect pre and post -construction conditions. *This condition still applies. 3. The stormwater management practices shall achieve a new overall reduction of at least 90% for total suspended solids and 60% for total phosphorous using industry accepted removal rates. This includes manipulation of the NURP50 Particle Distribution filtration efficiencies to match accepted literature values. *This condition has been met. 4. The sump manhole and SAFL Baffle shall not be included in the P8 model as the P8 model already assumes pretreatment. *This condition has been met. 5. All sumps with SAFL baffles shall be a minimum of 3 feet in depth. *This condition has been met. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 18 6. The applicant shall prepare and submit a Surface Water Pollution Prevention Plan that contains all required elements from Parts III and IV of the NPDES/SDS Construction Permit. This shall be a standalone document. *This condition has been met. Any disturbance of the buffer areas shall be restored with native vegetation appropriate to the area and the plans shall note this and the seed mix to be used. *This condition still applies. 8. A plan shall be prepared showing the placement of wetland buffer monuments. *This condition shall be modified as follows: A plan shall be prepared showing the placement of wetland buffer monuments including a monument at midpoint of east lot line for Lot 12. 9. All buffer monuments shall be installed prior to the sale of any lots. *This condition still applies. 10. All stormwater practices shall be placed into a drainage and utility easement if not included in an outlot. *This condition has been met. 11. All drainage swales shall be included in drainage and utility easements and the development shall make any future builder and homeowner aware that these may not be altered without submittal of a revised grading plan to the city and subsequent approval of that revised plan. *This condition has been met. 12. The development contract shall include language indicating that the Homeowners' Association shall be responsible for any landscaping work associated with the biofiltration feature and the city shall maintain the associated infrastructure including the underdrain, the filtration media and the piped storm sewer conveyance system. *This condition still applies. 13. The south biofiltration feature shall have a skimmer emergency overflow structure designed and installed. This condition has been met. 14. A detailed plan of the filtration basins, consistent with the MN Stormwater Manual shall be submitted with the final plat submittal for review and approval by city staff. It shall include, at a minimum, a plan view, a profile view, all necessary elevations, any in situ soil preparation, methodologies to be employed to protect from construction traffic, soil filter media specifications, any plantings and any appurtenant work to be done. *This condition still applies. 15. Underdrains and drain tile shall have tracer wire and cleanouts. *This condition still applies. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 19 16. Pretreatment shall be required for all filtration basins receiving piped discharge. *This condition has been met. 17. A forebay, surge basin or other approved energy dissipation device shall be provided for the inlet into the biofiltration feature included in the outlot. The selected practice must not create undue maintenance burdens. The end result shall be non -erosive velocities into the basin. *This condition has been met. 18. Efforts shall be made to raise the elevations of Lots 2 through 5 to assure positive flow towards the Anthem Place and ultimately to the treatment devices. *This condition has been met. 19. The applicant, their consultant and city staff shall collaborate to minimize drainage concerns in the back and side yards of lots 6 through 10. *This condition has been met. 20. Storm Water Utility Connection charges due at the final plat are estimated to be $58,880.00. *This condition shall be modified as follows: Storm Water Utility Connection charges due at the final plat are estimmed to be $58,880.00. RECOMMENDATION Staff recommends approval of the final plat, development contract and plans and specifications prepared by Stantec, dated 07/13/2016 for Anthem on the Park subject to the following conditions: Building I . Provide a 1:200 "clean" plat drawing. 2. Demolition permits required for the removal of any existing structures. 3. Buildings may be required to be designed by an architect and/or engineer as determined by the Building Official. 4. A final grading plan and soils report must be submitted to the Inspections Division before permits can be issued. 5. Retaining walls over four feet high require a permit and must be designed by a professional engineer. 6. Each lot must be provided with separate sewer and water services. 7. The applicant and or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 20 Engineering: 1. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: the east side of Lot 1. 2. The applicant shall revise lots 6-9 be a full -basement, rambler -style home. *This condition has been met. 3. The grading plan shall be revised to show a spot elevation at the centerline of each driveway where it meets Anthem Place prior to issuance of building permits. 4. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9 prior to start of construction. 5. The plans shall identify the areas intended for stockpiling materials on site during construction. 6. Any retaining wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA) per an HOA covenant to be recorded prior to issuance of any building permit for Lots 1-12, Block 1. 7. The applicant shall have their surveyor confirm all easements and right of way shown with a recent title survey before final plat documents are recorded. 8. The retaining wall on Lots 5 and 6 requires an encroachment agreement to be recorded with the final plat. 9. An entry monument is shown on Lot 1. This shall require a paper easement between Lot 1 and the HOA that shall be recorded prior to construction of the entry monument. 10. The applicant shall name Anthem Place with coordination with the Fire Marshall prior to submittal for final plat review. *This condition has met. 11. The applicant shall include the horizontal alignment tabulation for Anthem Place in the plans. 12. The developer shall show construction limits for utility work below Yosemite Ave and submit a staging and restoration prior to the start of utility construction. 13. The plan shall be revised to install a street light at the intersection of Anthem Place and Yosemite Avenue. 14. Driveway grades shall be shown on the plan in the final plat submittal. *This condition has been modified and met. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 21 15. Driveways shall be designed to meet all standards in City Code §20-1122. 16. The pedestrian ramp on the northwest corner of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. The plan shall be revised to include the replacement prior to the start of construction. 17. The plan shall be revised to note that sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. 18. The portion of the sanitary services that lies within the right-of-way shall be gravity -flowing. 19. MH #4 shall be moved north to shorten the length of services for Lots 8, 9 and 10. 20. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 21. Water and sewer partial hook-ups are due at the time of final plat. The partial hook-up fees will be assessed at the rate in effect at that time. 22. If the entry monument is to be built on City -owned Outlot A, the developer shall enter into an encroachment agreement with the City, prior to construction of the monument. 23. The plan shall be revised prior to the start of construction to provide velocity dissipation for the draintile outlet on Lot 10. 24. The plan shall be revised, prior to the start of construction, to move the yard drain on Lot 9 to the bottom of the swale. 25. The HOA shall own and maintain any draintile that crosses property lines. This shall be included in the HOA covenant documents to be recorded prior to issuance of any building permit for Lots 1-12, Block 1. 26. Lots 1-12, Block 1 shall be under the same Homeowners Association the covenants of which shall be recorded prior to issuance of any building permit for Lots 1-12, Block 1. 27. The existing survey shall call out existing structures that are not used as residents as "structures" rather than "houses". This shall be revised prior to start of construction. 28. The erosion control plan be revised prior to construction, to require steel posts for all silt fence. 29. The profile alignment for Anthem Place shall be revised, prior to the start of construction, at Sta 16+00, so that the vertical curve is a minimum of 144 feet in length, or otherwise adjusted to meet the City Code requirements §18-27(h). Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 22 30. The plan shall be revised, prior to the start of construction, to move the hydrant at Anthem Place and Yosemite Avenue to the north side of Anthem Place so as to provide a stub for future watermain connection to the north. Environmental Resources: 1. Ash trees shall be removed within the proposed tree preservation area. Removals shall be directed by the city. Reforestation trees may be located within the Outlot. 2. Colorado spruce and pin oak selections shall be replaced with species suitable for the area. Fire: 1. A three-foot clear space shall be maintained around fire hydrants. 2. Street sign(s) (temporary allowed) shall be installed prior to building permits being issued. Fire Marshal must approve signage. 3. Prior to combustible home construction fire apparatus access roads capable of supporting the weight of fire apparatus shall be made serviceable. 4. An addition address number will be required for lot #9. Its location shall be at the entrance of the private driveway. Sign location and size must be approved by the Fire Marshal. 5. Prior to combustible construction fire hydrants shall be made serviceable. 6. No burning permits will be issued for tree/ brush removal. Parks: 1. Full park dedication fees for 10 lots shall be collected per city ordinance in lieu of requiring parkland dedication. 2. Dedication of a 20-foot wide trail and a utility and drainage easement between lot 7 and lot 8. 3. Planning, engineering, and construction per city standards of an 8-foot wide bituminous trail within this easement connecting public Street "A" and Pheasant Hill Park. Plannine: 1. The front lot lines for lots 5 shall be the north property line, for lots 8 and 9 the east lot lines. 2. The entry monument may not be located within the right-of-way and must be located outside of the sight triangle. A sign easement shall be dedicated where the monument sign will be located. Todd Gerhardt Anthem on the Park Final Plat — Planning Case 2016-09 August 22, 2016 Page 23 Water Resources: 1. Runoff rates and volumes cannot be increased to the south. 2. Curve numbers and drainage areas shall accurately reflect pre and post -construction conditions. 3. Any disturbance of the buffer areas shall be restored with native vegetation appropriate to the area and the plans shall note this and the seed mix to be used. 4. A plan shall be prepared showing the placement of wetland buffer monuments including a monument at midpoint of east lot line for Lot 12. 5. All buffer monuments shall be installed prior to the sale of any lots. 6. The development contract shall include language indicating that the Homeowners' Association shall be responsible for any landscaping work associated with the biofiltration feature and the city shall maintain the associated infrastructure including the underdrain, the filtration media and the piped storm sewer conveyance system. A detailed plan of the filtration basins, consistent with the MN Stormwater Manual shall be submitted with the final plat submittal for review and approval by city staff. It shall include, at a minimum, a plan view, a profile view, all necessary elevations, any in situ soil preparation, methodologies to be employed to protect from construction traffic, soil filter media specifications, any plantings and any appurtenant work to be done. 8. Underdrains and drain file shall have tracer wire and cleanouts. 9. Storm Water Utility Connection charges due at the final plat are $58,880.00. ATTACHIIMNTS 1. Reduced Copy Final Plat. 2. Development Contract. g:\plan\2016 planning cases\2016-09 lake lucy rd - anthem on the park\final plat\staff report fp.doc ANTHEM ON THE PARK r�aaanzarne vm wmvr..eare..a erm.rxrx nx rrn rnxx mn bv. rmma.r.u.... turn..... .....in rr.. rm mmx nn n.urna.ueu qr ma.xunv vnxwex.mMwIWM Irxrl.Yr.xx1 IW.hr Ml Ip or.,w x.e.•.rlr+r,wn r a e1�.a..tlrr«.a,r..„war....rrr.r..ur_.,.�.rr..r.r... x�r�.�..: rr.r r.x wrr r.,...rM.r: �:.w M[Y unYrrn Jrx+mpr �.m rn! m Wy�N yrYyp nprry�Yt�Aa]o1�,p MI�. mn.m x[.r.rmrw Nv nm ex pe'v m.n.mnn rxn u,+inr..n rnivnxr �- mFtl 1 t5 xw,mur.xr,rma..Varrtl mwrvw ..a..ur..w�wnee.. IxM rxme r.q w.wa... a.xw...w..rm.e-.r.wrwawawrr�.. w.w. tl.r.yx w.or.ex.awa .mrwmeea x. �e_..eww....xrrr.r. x.n n.orwam•a.x..a. tl+xw. .. ww r�•rrlur vrnwn r"a:o�r • u.+oma.oxww. •" w xn.=rm. mr�n.r®wi.rr. awn ..r ,swrreryr..arn.. x..wea. e. w.r.+rx. _ r.rw.w r.e..wrera.ewrx. r.x. u.w c.aw.x..n�rr w I® N IN 1.I u4NM1e 1 ® Stantec CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA ANTHEM ON THE PARK DEVELOPMENT CONTRACT (Developer Installed Improvements) TABLE OF CONTENTS SPECIAL PROVISIONS PAGE 1. REQUEST FOR PLAT APPROVAL............................................................................SP-1 2. CONDITIONS OF PLAT APPROVAL........................................................................SP-1 3. DEVELOPMENT PLANS............................................................................................SP-1 4. IMPROVEMENTS........................................................................................................ SP-2 5. TIME OF PERFORMANCE.........................................................................................SP-2 6. SECURITY....................................................................................................................SP-2 7. NOTICE.........................................................................................................................SP-3 8. OTHER SPECIAL CONDITIONS................................................................................SP-3 9. GENERAL CONDITIONS........................................................................................... SP-7 GENERAL CONDITIONS 1. RIGHT TO PROCEED.................................................................................................GC-1 2. PHASED DEVELOPMENT........................................................................................GC-1 3. PRELIMINARY PLAT STATUS................................................................................GC-I 4. CHANGES IN OFFICIAL CONTROLS.....................................................................GC-1 5. IMPROVEMENTS.......................................................................................................GC-I 6. IRON MONUMENTS..................................................................................................GC-2 7. LICENSE......................................................................................................................GC-2 8. SITE EROSION AND SEDIMENT CONTROL.........................................................GC-2 8A. EROSION CONTROL DURING CONSTRUCTION OF A DWELLING OROTHER BUILDING..................................................................................GC-2 9. CLEANUP...................................................................................................................GC-3 10. ACCEPTANCE AND OWNERSHIP OF IMPROVEMENTS....................................GC-3 11. CLAIMS.......................................................................................................................GC-3 12. PARK DEDICATION..................................................................................................GC-3 13. LANDSCAPING..........................................................................................................GC-3 14. WARRANTY...............................................................................................................GC-4 15. LOTPLANS.................................................................................................................GC-4 16. EXISTING ASSESSMENTS.......................................................................................GC-4 17. HOOK-UP CHARGES.................................................................................................GC-4 18. PUBLIC STREET LIGHTING.....................................................................................GC-4 19. SIGNAGE.....................................................................................................................GC-5 20. HOUSE PADS..............................................................................................................GC-5 21. RESPONSIBILITY FOR COSTS................................................................................GC-5 22. DEVELOPER'S DEFAULT.........................................................................................GC-6 22. MISCELLANEOUS A. Construction Trailers........................................................................................GC-6 B. Postal Service ....................................................................................................GC-7 C. Third Parties......................................................................................................GC-7 D. Breach of Contract............................................................................................GC-7 E. Severability .......................................................................................................GC-7 F. Building Permits...............................................................................................GC-7 G. Waivers/Amendments.......................................................................................GC-7 H. Release..............................................................................................................GC-7 I. Insurance........................................................................................................... GC-7 J. Remedies...........................................................................................................GC-8 K. Assignability .....................................................................................................GC-8 L. Construction Hours...........................................................................................GC-8 M. Noise Amplification..........................................................................................GC-8 N. Access...............................................................................................................GC-8 O. Street Maintenance ............................................................................................GC-8 P. Storm Sewer Maintenance ................................................................................GC-9 Q. Soil Treatment Systems....................................................................................GC-9 R. Variances...........................................................................................................GC-9 S. Compliance with Laws, Ordinances, and Regulations.....................................GC-9 T. Proof of Title.....................................................................................................GC-9 U. Soil Conditions................................................................................................GC-10 V. Soil Correction................................................................................................GC-10 W. Haul Routes..........................................................................................................GC-10 X. Development Signs..............................................................................................GC-10 Y. Construction Plans...............................................................................................GC-10 Z. As -Built Lot Surveys...........................................................................................GC-11 li CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) F411"IV. _1_aluto) `&I0IDo All :7C4 AGREEMENT dated , 2016 by and between the CITY OF CHANHASSEN, a Minnesota municipal corporation (the "City"), and, YOSEMI TE HOLDINGS LLC, a Limited Liability Company (the "Developer"). 1. Request for Plat Approval. The Developer has asked the City to approve a plat for ANTHEM ON THE PARK (referred to in this Contract as the "plat"). The land is legally described on the attached Exhibit "A". 2. Conditions of Plat Approval. The City hereby approves the plat on condition that the Developer enter into this Contract, fittnish the security required by it, and record the plat with the County Recorder or Registrar of Titles within 30 days after the City Council approves the plat. 3. Development Plans. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract. With the exception of Plan A, the plans may be prepared, subject to City approval, after entering the Contract, but before commencement of any work in the plat. If the plans vary from the written terms of this Contract, the written terms shall control. The plans are: Plan A: Final plat approved 8/22/2016, prepared by Stantec. Plan B: Grading, Drainage and Erosion Control Plan dated 7/13/2016, prepared by Stantec. Plan C: Plans and Specifications for hnprovements dated 7/13/2016, prepared by Stantec. Plan D: Landscape Plan dated 7/13/2016, prepared by Stantec. SP-1 4. Improvements. The Developer shall install and pay for the following: A. Sanitary Sewer System B. Water System C. Storm Water Drainage System D. Streets E. Concrete Curb and Gutter F. Street Lights G. Site Grading/Restoration H. Underground Utilities (e.g. gas, electric, telephone, CATV) I. Setting of Lot and Block Monuments J. Surveying and Staking K. Landscaping L. Erosion Control 5. Time of Performance. The Developer shall install all required improvements by November 15, 2016 except for the landscaping, entry monument and wear course on public streets which shall be installed by November 15, 2017. The Developer may, however, request an extension of time from the City Engineer. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 6. Security. To guarantee compliance with the terms of this Contract, payment of special assessments, payment of the costs of all public improvements, and construction of all public improvements, the Developer shall furnish the City with a letter of credit in the form attached hereto, from a bank acceptable to the City, or cash escrow ("security") for $766,414.30. The amount of the security was calculated as 110% of the following: Site Grading $108,338.00 Erosion Control/Restoration $ 10,028.18 Topsoil (75% of lot area*6 inches at $30/CY) $ 94,689.58 Sanitary Sewer $ 71,940.00 Watermain $ 64,130.00 Storm Sewer, Drainage System, including cleaning and maintenance $ 80,295.00 Streets and Trails $210,090.50 Sub -total, Construction Costs $639,211.26 Engineering, surveying, and inspection (7% of construction costs) $ 44,744.79 Landscaping (2% of construction costs) $ 12,784.23 Sub -total, Other Costs $ 57,529.01 TOTAL COST OF PUBLIC II"ROVEMENTS $696,740.28 SECURITY AMOUNT (110% of $696,740.28) $766,41430 This breakdown is for historical reference; it is not a restriction on the use of the security. The security shall be subject to the approval of the City. The City may draw down the security, without SP-2 notice, for any violation of the terms of this Contract. If the required public improvements are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the draw shall be used to cure the default. With City approval, the security may be reduced from time to time as financial obligations are paid, but in no case shall the security be reduced to a point less than 10% of the original amount until (1) all improvements have been completed, (2) iron monuments for lot comers have been installed, (3) all financial obligations to the City satisfied, (4) the required "record" plans have been received by the City, (5) a warranty security is provided, and (6) the public improvements are accepted by the City. 7. Notice. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail at the following address: YOSEMITE HOLDINGS LLC 4960 SUSSEX PLACE SHOREWOOD, MN 55331-9217 Phone: 952-470-5121 Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or mailed to the City by certified mail in care of the City Manager at the following address: Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, Minnesota 55317, Telephone (952) 227-1100. 8. Other Special Conditions. A. SECURITIES AND FEES A $766,414.30 letter of credit or escrow for the developer -installed improvements, the $170,081.81 cash administration fee and the fully -executed development contract must be submitted and shall be submitted prior to scheduling a pre -construction meeting. The cash fee was calculated as follows: Administration fee (based on estimated cost: 3% of $500,000 plus 2% of $196,740.28) $ 18,934.81 Final Plat Processing $ 450.00 GIS fee: 12 parcels @ $10/parcel + $25 for the plat $ 145.00 Park Dedication Fee: 10 parcels @ $5,800/parcel $ 58,000.00 Partial payment of City sewer and water hookup fees: 12 units @ $691/unit (sewer) + $2,065/unit (water) $ 33,072.00 Street light operating fee: 2 lights @ $300/light $ 600.00 Surface Water Management Fee $ 58,880.00 Total $170,081.81 B. Buildine: 1. Provide a 1:200 "clean" plat drawing. SP-3 2. Demolition permits required for the removal of any existing structures. 3. Buildings may be required to be designed by an architect and/or engineer as determined by the Building Official. 4. A final grading plan and soils report must be submitted to the Inspections Division before permits can be issued. 5. Retaining walls over four feet high require a permit and must be designed by a professional engineer. 6. Each lot must be provided with separate sewer and water services. 7. The applicant and or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. C. Ent'ineering: 1. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: the east side of Lot 1. 2. The grading plan shall be revised to show a spot elevation at the centerline of each driveway where it meets Anthem Place prior to issuance of building permits. 3. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9 prior to start of construction. 4. The plans shall identify the areas intended for stockpiling materials on site during construction. 5. Any retaining wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA) per an HOA covenant to be recorded prior to issuance of any building permit for Lots 1-12, Block 1. 6. The applicant shall have their surveyor confirm all easements and right of way shown with a recent title survey before final plat documents are recorded. 7. The retaining wall on Lots 5 and 6 requires an encroachment agreement to be recorded with the final plat. 8. An entry monument is shown on Lot 1. This shall require a paper easement between Lot 1 and the HOA that shall be recorded prior to construction of the entry monument. 9. The applicant shall include the horizontal alignment tabulation for Anthem Place in the plans. 10. The developer shall show construction limits for utility work below Yosemite Ave and submit a staging and restoration prior to the start of utility construction. SP-4 11. The plan shall be revised to install a street light at the intersection of Anthem Place and Yosemite Avenue. 12. Driveways shall be designed to meet all standards in City Code §20-1122. 13. The pedestrian ramp on the northwest comer of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. The plan shall be revised to include the replacement prior to the start of construction. 14. The plan shall be revised to note that sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. 15. The portion of the sanitary services that lies within the right-of-way shall be gravity - flowing. 16. MH #4 shall be moved north to shorten the length of services for Lots 8, 9 and 10. 17. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 18. Water and sewer partial hook-ups are due at the time of final plat. The partial hook-up fees will be assessed at the rate in effect at that time. 19. If the entry monument is to be built on City -owned Outlot A, the developer shall enter into an encroachment agreement with the City, prior to construction of the monument. 20. The plan shall be revised prior to the start of construction to provide velocity dissipation for the draintile outlet on Lot 10. 21. The plan shall be revised, prior to the start of construction, to move the yard drain on Lot 9 to the bottom of the swale. 22. The HOA shall own and maintain any draintile that crosses property lines. This shall be included in the HOA covenant documents to be recorded prior to issuance of any building permit for Lots 1-12, Block 1. 23. Lots 1-12, Block 1 shall be under the same Homeowners Association the covenants of which shall be recorded prior to issuance of any building permit for Lots 1-12, Block 1. 24. The existing survey shall call out existing structures that are not used as residents as "structures" rather than "houses". This shall be revised prior to start of construction. 25. The erosion control plan be revised prior to construction, to require steel posts for all silt fence. 26. The profile alignment for Anthem Place shall be revised, prior to the start of construction, at Sta 16+00, so that the vertical curve is a minimum of 144 feet in length, or otherwise adjusted to meet the City Code requirements § 18-27(h). 619M 27. The plan shall be revised, prior to the start of construction, to move the hydrant at Anthem Place and Yosemite Avenue to the north side of Anthem Place so as to provide a stub for future watermain connection to the north. D. Environmental Resources: 1. Ash trees shall be removed within the proposed tree preservation area. Removals shall be directed by the city. Reforestation trees may be located within Outlot. 2. Colorado spruce and pin oak selections shall be replaced with species suitable for the area. E. Fire: 1. A three-foot clear space shall be maintained around fire hydrants. 2. Street sign(s) (temporary allowed) shall be installed prior to building permits being issued. Fire Marshal must approve signage. 3. Prior to combustible home construction fire apparatus access roads capable of supporting the weight of fire apparatus shall be made serviceable.. 4. An addition address number will be required for lot #9. Its location shall be at the entrance of the private driveway. Sign location and size must be approved by the Fire Marshal. 5. Prior to combustible construction fire hydrants shall be made serviceable. 6. No burning permits will be issued for tree/ brush removal. F. Parks: 1. Full park dedication fees for 10 lots shall be collected per city ordinance in lieu of requiring parkland dedication. 2. Dedication of a 20-foot wide trail and a utility and drainage easement between lot 7 and lot 8. 3. Planning, engineering, and construction per city standards of an 8-foot wide bituminous trail within this easement connecting public Street "A" and Pheasant Hill Park. G. Planning: The front lot lines for lots 5 shall be the north property line, for lots 8 and 9 the east lot lines. 2. The entry monument may not be located within the right-of-way and must be located outside of the sight triangle. A sign easement shall be dedicated where the monument sign will be located. SP-6 H. Water Resources: 1. Runoff rates and volumes cannot be increased to the south. s. 2. Curve numbers and drainage areas shall accurately reflect pre and post -construction conditions. 3. Any disturbance of the buffer areas shall be restored with native vegetation appropriate to the area and the plans shall note this and the seed mix to be used. 4. A plan shall be prepared showing the placement of wetland buffer monuments including a monument at midpoint of east lot line for Lot 12. 5. All buffer monuments shall be installed prior to the sale of any lots. 6. The development contract shall include language indicating that the Homeowners' Association shall be responsible for any landscaping work associated with the biofiltration feature and the city shall maintain the associated infrastructure including the underdrain, the filtration media and the piped storm sewer conveyance system. A detailed plan of the filtration basins, consistent with the MN Stormwater Manual shall be submitted with the final plat submittal for review and approval by city staff. It shall include, at a minimum, a plan view, a profile view, all necessary elevations, any in situ soil preparation, methodologies to be employed to protect from construction traffic, soil filter media specifications, any plantings and any appurtenant work to be done. 8. Underdrains and drain tile shall have tracer wire and cleanouts. 9. Storm Water Utility Connection charges due at the final plat are $58,880.00. 9. General Conditions. The general conditions of this Contract are attached as Exhibit "B" and incorporated herein. SP-7 CITY OF CHANHASSEN 1L.", (SEAL) AND: Denny Laufenburger, Mayor Todd Gerhardt, City Manager YOSEMITE HOLDINGS LLC: I al STATE OF MINNESOTA) (ss. COUNTY OF CARVER ) Terry Forbord, COO The foregoing instrument was acknowledged before me this _ day of 2016, by Denny Laufenburger, Mayor, and by Todd Gerhardt, City Manager, of the City of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. NOTARY PUBLIC STATE OF MINNESOTA ) (ss. COUNTY OF ) The foregoing instrument was acknowledged before me this day of 2016, by Terry Forbord, Chief Operating Officer of Yosemite Holdings LLC, a Limited Liability Company, on behalf of the company. DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952) 227-1100 NOTARY PUBLIC 6w-�' EXIIIBIT "A" TO DEVELOPMENT CONTRACT LEGAL DESCRIPTION OF SUBJECT PROPERTY: That part of the Northwest Quarter of Section 2, Township 116, Range 23, Carver County, Minnesota described as follows: Beginning at the Southwest corner of the Northwest Quarter, Section 2, Township 116, Range 23; thence East along the half section line 330 feet (20 rods); thence North 660.00 feet (40 rods); thence West 330 feet (20 rods) to the section line; thence South 660 feet (40 rods) to the place of beginning; EXCEPT so much of the following described tract as in the foregoing description, beginning at a point on the section line between said Section 2 and 3; Township 116, Range 23, said point being 610 feet North of the Quarter section corner between said Section 2 and 3 and marked by an iron gas pipe set in the ground; thence North along the section 591.5 feet to a cartway 16.5 (1 rod) wide; thence East along the South boundary of said cartway 280.5 feet to the center of a street 33 feet (2 rods) wide; thence South 4 degrees 47 minutes East along the center of said street 593.56 feet; thence West 330 feet to the place of beginning, according to the United States Government Survey thereof. AND That part of the Southeast Quarter of the Northeast Quarter (SE1/4NE1/4) of Section 3, Township 116, Range 23, described as follows: Starting at the Southeast Corner of said NE 1/4 of said Section 3, running Westerly along the South line of said SE 1/4 of said NE 1/4 a distance of 80 feet, then Northerly 275 feet, then Easterly 80 feet, thence Southerly along the Easterly line of said SE 1/4 of said NE 1/4 to the point of beginning, Carver County, Minnesota. 0 That part of the Southeast Quarter of the Northeast Quarter of Section 3, Township 116, Range 23, as follows: Beginning at a point on the South line of said Southeast Quarter of the Northeast Quarter, 80 feet West of said Southeast corner; thence continuing along said line 170 feet; thence North 275 feet; thence West 80 feet; thence North 170.5 feet; thence North 8 1/2 degrees, East 13 rods and 3 links; thence East 18 rods, thence South 385 feet; thence West 80 feet; thence South 275 feet to the point of beginning, Carver County, Minnesota. SP-9 MORTGAGE HOLDER CONSENT TO DEVELOPMENT CONTRACT which holds a mortgage on the subject property, the development of which is governed by the foregoing Development Contract, agrees that the Development Contract shall remain in full force and effect even if it forecloses on its mortgage. Dated this _ day of 20_. STATE OF MINNESOTA ) (ss. COUNTY OF ) The foregoing instrument was acknowledged before me this _ day of 20_, by DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952)227-1100 NOTARY PUBLIC SP-10 FEE OWNER CONSENT TO DEVELOPMENT CONTRACT fee owners of all or part of the subject property, the development of which is governed by the foregoing Development Contract, affirm and consent to the provisions thereof and agree to be bound by the provisions as the same may apply to that portion of the subject property owned by them. Dated this _ day of 20_. STATE OF MINNESOTA ) (ss. COUNTY OF ) The foregoing instrument was acknowledged before me this _ day of 20 .by DRAFTED BY: City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 (952) 227-1100 NOTARY PUBLIC SP-11 IRREVOCABLE LETTER OF CREDIT No. _ Date: TO: City of Chanhassen 7700 Market Boulevard, Box 147 Chanhassen, Minnesota 55317 Dear Sir or Madam: We hereby issue, for the account of (Name of Developer) and in your favor, our Irrevocable Letter of Credit in the amount of $ available to you by your draft drawn on sight on the undersigned bank. The draft must: a) Bear the clause, "Drawn under Letter of Credit No. dated 2, of (Name of Bank) ; b) Be signed by the Mayor or City Manager of the City of Chanhassen. c) Be presented for payment at (Address of Bank) on or before 4:00 p.m. on November 30, 2 This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty- five (45) days prior to the next annual renewal date (which shall be November 30 of each year), the Bank delivers written notice to the Chanhassen City Manager that it intends to modify the terms of, or cancel, this Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed as follows: Chanhassen City Manager, Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, MN 55317, and is actually received by the City Manager at least thirty (30) days prior to the renewal date. This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not referred to herein. This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under this Letter of Credit. This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for Documentary Credits, International Chamber of Commerce Publication No. 600. We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored upon presentation. IBM Its SP-12 CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) la/it 1: Y t RA NEXIN111311relm 1. Right to Proceed. Within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, 2) the necessary security and fees have been received by the City, 3) the plat has been recorded with the County Recorder's Office or Registrar of Title's Office of the County where the plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been satisfied and then the Developer may proceed. 2. Phased Development. If the plat is a phase of a multiphased preliminary plat, the City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. Park charges and area charges for sewer and water referred to in this Contract are not being imposed on outlets, if any, in the plat that are designated in an approved preliminary plat for future subdivision into lots and blocks. Such charges will be calculated and imposed when the outlots are final platted into lots and blocks. 3. Preliminary Plat Status. If the plat is a phase of a multi -phased preliminary plat, the preliminary plat approval for all phases not final platted shall lapse and be void unless final platted into lots and blocks, not outlots, within two (2) years after preliminary plat approval. 4. Changes in Official Controls. For two (2) years from the date of this Contract, no amendments to the City s Comprehensive Plan, except an amendment placing the plat in the current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law the City may require compliance with any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 5. Improvements. The improvements specified in the Special Provisions of this Contract shall be installed in accordance with City standards, ordinances, and plans and specifications which have been prepared and signed by a competent registered professional engineer furnished to the City and approved by the City Engineer. The Developer shall obtain all necessary permits from the Metropolitan Council Environmental Services and other pertinent agencies before proceeding with construction. The City will, at the Developer's expense, have one or more Wei construction inspectors and a soil engineer inspect the work on a full or part-time basis. The Developer shall also provide a qualified inspector to perform site inspections on a daily basis. Inspector qualifications shall be submitted in writing to the City Engineer. The Developer shall instruct its project engineer/inspector to respond to questions from the City Inspector(s) and to make periodic site visits to satisfy that the construction is being performed to an acceptable level of quality in accordance with the engineer's design. The Developer or his engineer shall schedule a preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties concerned, including the City staff, to review the program for the construction work. 6. Iron Monuments. Before the security for the completion of utilities is released, all monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.02, Subd. 1. The Developer's surveyor shall submit a written notice to the City certifying that the monuments have been installed. 7. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 8. Site Erosion and Sediment Control. Before the site is rough graded, and before any utility construction is commenced or building permits are issued, the erosion and sediment control plan, Plan B, shall be implemented, inspected, and approved by the City. The City may impose additional erosion and sediment control requirements if they would be beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. Except as otherwise provided in the erosion and sediment control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion and sediment transport. If the Developer does not comply with the erosion and sediment control plan and schedule of supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion and sediment transport at the Developer's expense. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. No development will be allowed and no building permits will be issued unless the plat is in full compliance with the erosion and sediment control requirements. Erosion and sediment control needs to be maintained until vegetative cover has been restored, even if construction has been completed and accepted. After the site has been stabilized to where, in the opinion of the City, there is no longer a need for erosion and sediment control, the City will authorize the removal of the erosion and sediment control, i.e. hay bales and silt fence. The Developer shall remove and dispose of the erosion and sediment control measures. 8a. Erosion Control During Construction of a Dwelling or Other Building. Before a building permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash escrow or letter of credit per lot shall also be furnished to the City to guarantee compliance with City Code § 7-22. GC-2 9. Clean up. The Developer shall maintain a neat and orderly work site and shall daily clean, on and off site, dirt and debris, including blowables, from streets and the surrounding area that has resulted from construction work by the Developer, its agents or assigns. 10. Acceptance and Ownership of Improvements. Upon completion and acceptance by the City of the work and construction required by this Contract, the improvements lying within public easements shall become City property. After completion of the improvements, a representative of the contractor, and a representative of the Developer's engineer will make a final inspection of the work with the City Engineer. Before the City accepts the improvements, the City Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved plans and specifications and the Developer and his engineer shall submit a written statement to the City Engineer certifying that the project has been completed in accordance with the approved plans and specifications. The appropriate contractor waivers shall also be provided. Final acceptance of the public improvements shall be by City Council resolution. 11. Claims. In the event that the City receives claims from laborers, materialmen, or others that work required by this Contract has been performed, the sums due them have not been paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees posted with the City, and if the claims are not resolved at least ninety (90) days before the security required by this Contract will expire, the Developer hereby authorizes the City to commence an Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts, to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the District Court, except that the Court shall retain jurisdiction to determine attorneys' fees. 12. Park Dedication. The Developer shall pay full park dedication fees in conjunction with the installation of the plat improvements. The park dedication fees shall be the current amount in force at the time of final platting pursuant to Chanhassen City Ordinances and City Council resolutions. 13. Landscaping. Landscaping shall be installed in accordance with Plan D. Unless otherwise approved by the City, trees not listed in the City's approved tree list are prohibited. The minimum tree size shall be two and one-half (2'/2) inches caliper, either bare root in season, or balled and burlapped. The trees may not be planted in the boulevard (area between curb and property line). In addition to any sod required as a part of the erosion and sediment control plan, Plan B, the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each lot utilizing a minimum of six (6) inches of topsoil as a base. Seed or sod shall also be placed on all disturbed areas of the lot. If these improvements are not in place at the time a certificate of occupancy is requested, a financial guarantee of $750.00 in the form of cash or letter of credit shall be provided to the City. These conditions must then be complied with within two (2) months after the certificate of occupancy issued, except that if the certificate of occupancy is issued between October 1 through May 1 these conditions must be complied with by the following July 1 st. Upon expiration of the time period, inspections will be conducted by City staff to verify satisfactory completion of all conditions. City staff will conduct inspections of incomplete items with a $50.00 inspection fee deducted from the escrow fund for each inspection. After satisfactory inspection, the financial guarantee shall be returned. If the requirements are not satisfied, the City may use the GC-3 security to satisfy the requirements. The City may also use the escrowed funds for maintenance of erosion control pursuant to City Code Section 7-22 or to satisfy any other requirements of this Contract or of City ordinances. These requirements supplement, but do not replace, specific landscaping conditions that may have been required by the City Council for project approval. 14. Warranty. The Developer warrants all improvements required to be constructed by it pursuant to this Contract against poor material and faulty workmanship. The Developer shall submit either 1) a warranty/maintenance bond for 100% of the cost of the improvement, or 2) a letter of credit for twenty-five percent (25%) of the amount of the original cost of the improvements. A. The required warranty period for materials and workmanship for the utility contractor installing public sewer and water mains shall be two (2) years from the date of final written City acceptance of the work. B. The required warranty period for all work relating to street construction, including concrete curb and gutter, sidewalks and trails, materials and equipment shall be subject to two (2) years from the date of final written acceptance. C. The required warranty period for sod, trees, and landscaping is one full growing season following acceptance by the City. 15. Lot Plans. Prior to the issuance of building permits, an acceptable Grading, Drainage, Erosion Control including silt fences, and Tree Removal Plan shall be submitted for each lot for review and approval by the City Engineer. Each plan shall assure that drainage is maintained away from buildings and that tree removal is consistent with development plans and City Ordinance. 16. Existing Assessments. Any existing assessments against the plat will be re -spread against the plat in accordance with City standards. 17. Hook-up Charges.. At the time of final plat approval the Developer shall pay 30% of the City Sewer Hook-up charge and 30% of the City Water hook up charge for each lot in the plat in the amount specified in Special Provision, Paragraph 8, of this Development Contract. The balance of the hook-up charges is collected at the time building permits are issued are based on 70% of the rates then in effect, unless a written request is made to assess the costs over a four year term at the rates in effect at time of application. 18. Public Street Lighting. The Developer shall have installed and pay for public street lights in accordance with City standards. The public street lights shall be accepted for City ownership and maintenance at the same time that the public street is accepted for ownership and maintenance. A plan shall be submitted for the City Engineer's approval prior to the installation. Before the City signs the final plat, the Developer shall pay the City a fee of $300.00 for each street light installed in the plat. The fee shall be used by the City for fumisbing electricity and maintaining each public street light for twenty (20) months. GC-4 19. Signage. All street signs, traffic signs, and wetland monumentation required by the City as a part of the plat shall be famished and installed by the City at the sole expense of the Developer. 20. House Pads. The Developer shall promptly furnish the City "as -built" plans indicating the amount, type and limits of fill on any house pad location. 21. Responsibility for Costs. A. The Developer shall pay an administrative fee in conjunction with the installation of the plat improvements. This fee is to cover the cost of City Staff time and overhead for items such as review of construction documents, preparation of the Development Contract, monitoring construction progress, processing pay requests, processing security reductions, and final acceptance of improvements. This fee does not cover the City's cost for construction inspections. The fee shall be calculated as follows: i) if the cost of the construction of public improvements is less than $500,000, three percent (3%) of construction costs; ii) if the cost of the construction of public improvements is between $500,000 and $1,000,000, three percent (3%) of construction costs for the first $500,000 and two percent (2%) of construction costs over $500,000; iii) if the cost of the construction of public improvements is over $1,000,000, two and one-half percent (2'h%) of construction costs for the first $1,000,000 and one and one-half percent (1'/a%) of construction costs over $1,000,000. Before the City signs the final plat, the Developer shall deposit with the City a fee based upon construction estimates. After construction is completed, the final fee shall be determined based upon actual construction costs. The cost of public improvements is defined in paragraph 6 of the Special Provisions. B. In addition to the administrative fee, the Developer shall reimburse the City for all costs incurred by the City for providing construction and erosion and sediment control inspections. This cost will be periodically billed directly to the Developer based on the actual progress of the construction. Payment shall be due in accordance with Article 21E of this Agreement. C. The Developer shall hold the City and its officers and employees harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers and employees for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. D. In addition to the administrative fee, the Developer shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. GC-5 E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt all plat development work and construction, including but not limited to the issuance of building permits for lots which the Developer may or may not have sold, until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of 8% per year. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as, but not limited to, sewer availability charges ("SAC"), City water connection charges, City sewer connection charges, and building permit fees. G. Private Utilities. The Developer shall have installed and pay for the installation of electrical, natural gas, telephone, and cable television service in conjunction with the overall development improvements. These services shall be provided in accordance with each of the respective franchise agreements held with the City. H. The developer shall pay the City a fee established by City Council resolution, to reimburse the City for the cost of updating the City's base maps, GIS data base files, and converting the plat and record drawings into an electronic format. Record drawings must be submitted within four months of final acceptance of public utilities. All digital information submitted to the City shall be in the Carver County Coordinate system. 22. Developer's Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in default, not less than four (4) days in advance. This Contract is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 23. Miscellaneous. A. Construction Trailers. Placement of on -site construction trailers and temporary job site offices shall be approved by the City Engineer as a part of the pre -construction meeting for installation of public improvements. Trailers shall be removed from the subject property within thirty (30) days following the acceptance of the public improvements unless otherwise approved by the City Engineer. B. Postal Service. The Developer shall provide for the maintenance of postal service in accordance with the local Postmaster's request. C. Third Parties. Third parties shall have no recourse against the City under this Contract. The City is not a guarantor of the Developer's obligations under this Contract. The City shall have no responsibility or liability to lot purchasers or others for the City's failure to enforce this Contract or for allowing deviations from it. D. Breach of Contract. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. The City may also GC-6 issue a stop work order halting all plat development until the breach has been cured and the City has received satisfactory assurance that the breach will not reoccur. E. Severability. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. F. Building Permits. Building permits will not be issued in the plat until sanitary sewer, watermain, and storm sewer have been installed, tested, and accepted by the City, and the streets needed for access have been paved with a bituminous surface and the site graded and revegetated in accordance with Plan B of the development plans. G. Waivers/Amendments. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. Release. This Contract shall run with the land and may be recorded against the title to the property. After the Developer has completed the work required of it under this Contract, at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the issuance of such a certificate, individual lot owners may make as written request for a certificate applicable to an individual lot allowing a minimum of ten (10) days for processing. I. Insurance. Developer shall take out and maintain, or cause the same to be taken out and maintained until six (6) months after the City has accepted the public improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $500,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy, and the Developer shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10) days advance written notice of the cancellation of the insurance. The certificate may not contain any disclaimer for failure to give the required notice. J. Remedies. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, expressed or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. K. Assimability. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. GC-7 L. Construction Hours. Construction hours, including pick-up and deliveries of material and equipment and the operation of any internal combustion engine, may only occur from 7:00 am. to 6:00 p.m. on weekdays, from 9:00 am. to 5:00 p.m. on Saturdays with no such activity allowed on Sundays or on legal holidays. Contractors must require their subcontractors, agents and supplies to comply with these requirements and the Contractor is responsible for their failure to do so. Under emergency conditions, this limitation may be waived by the written consent of the City Engineer. If construction occurs outside of the permitted construction hours, the Contractor shall pay the following administrative penalties: First violation $ 500.00 Second violation $ 1,000.00 Third & subsequent violations All site development and construction must cease for seven (7) calendar days M. Noise Amplification. The use of outdoor loudspeakers, bullhoms, intercoms, and similar devices is prohibited in conjunction with the construction of homes, buildings, and the improvements required under this contract. The administrative penalty for violation of construction hours shall also apply to violation of the provisions in this paragraph. N. Access. All access to the plat prior to the City accepting the roadway improvements shall be the responsibility of the Developer regardless if the City has issued building permits or occupancy permits for lots within the plat. O. Street Maintenance. The Developer shall be responsible for all street maintenance until streets within the plat are accepted by the City. Warning signs shall be placed by the Developer when hazards develop in streets to prevent the public from traveling on same and directing attention to detours. If streets become impassable, the City may order that such streets shall be barricaded and closed. The Developer shall maintain a smooth roadway surface and provide proper surface drainage. The Developer may request, in writing, that the City plow snow on the streets prior to final acceptance of the streets. The City shall have complete discretion to approve or reject the request. The City shall not be responsible for reshaping or damage to the street base or utilities because of snow plowing operations. The provision of City snow plowing service does not constitute final acceptance of the streets by the City. P. Storm Sewer Maintenance. The Developer shall be responsible for cleaning and maintenance of the storm sewer system (including ponds, pipes, catch basins, culverts and swales) within the plat and the adjacent off -site storm sewer system that receives storm water from the plat. The Developer shall follow all instructions it receives from the City concerning the cleaning and maintenance of the storm sewer system. The Developer's obligations under this paragraph shall end two (2) years after the public street and storm drainage improvements in the plat have been accepted by the City. Twenty percent (20%) of the storm sewer costs, shown under section 6 of the special provisions of this contract, will be held by the City for the duration of the 2-year maintenance period. Q. Soil Treatment Systems. If soil treatment systems are required, the Developer shall clearly identify in the field and protect from alteration, unless suitable altemative sites are first GC-8 provided, the two soil treatment sites identified during the platting process for each lot. This shall be done prior to the issuance of a Grading Permit. Any violation/disturbance of these sites shall render them as unacceptable and replacement sites will need to be located for each violated site in order to obtain a building pemrit. R. Variances. By approving the plat, the Developer represents that all lots in the plat are buildable without the need for variances from the City's ordinances. S. Compliance with Laws. Ordinances. and Re ations. In the development of the plat the Developer shall comply with all laws, ordinances, and regulations of the following authorities: 1. City of Chanhassen; 2. State of Minnesota, its agencies, departments and commissions; 3. United States Army Corps of Engineers; 4. Watershed District(s); 5. Metropolitan Government, its agencies, departments and commissions. T. Proof of Title. Upon request, the Developer shall famish the City with evidence satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to enter into this Development Contract. U. Soil Conditions. The Developer acknowledges that the City makes no representations or warranties as to the condition of the soils on the property or its fitness for construction of the improvements or any other purpose for which the Developer may make use of such property. The Developer further agrees that it will indemnify, defend, and hold harmless the City, its governing body members, officers, and employees from any claims or actions arising out of the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or pollutants were caused to be there by the City. V. Soil Correction. The Developer shall be responsible for soil correction work on the property. The City makes no representation to the Developer concerning the nature of suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots which have no fill material a soils report from a qualified soils engineer is not required unless the City's building inspection department determines from observation that there may be a soils problem. On lots with fill material that have been mass graded as part of a multi -lot grading project, a satisfactory soils report from a qualified soils engineer shall be provided before the City issues a building permit for the lot. On lots with fill material that have been custom graded, a satisfactory soils report from a qualified soils engineer shall be provided before the City inspects the foundation for a building on the lot. W. Haul Routes. The Developer, the Developer's contractors or subcontractors must submit proposed haul routes for the import or export of soil, construction material, construction equipment or construction debris, or any other purpose. All haul routes must be approved by the City Engineer Cs:�b� X. Develonment Signs. The Developer shall post a six foot by eight foot development sign in accordance with City Detail Plate No. 5313 at each entrance to the project. The sign shall be in place before construction of the required improvements commences and shall be removed when the required improvements are completed, except for the final lift of asphalt on streets. The signs shall contain the following information: project name, name of developer, developer's telephone number and designated contact person, allowed construction hours. Y. Construction Plans. Upon final plat approval, the developer shall provide the City with two complete sets of full-size construction plans and four sets of I1"x17" reduced construction plan sets and three sets of specifications. Within four months after the completion of the utility improvements and base course pavement and before the security is released, the Developer shall supply the City with the following: (1) a complete set of reproducible Mylar as -built plans, (2) two complete full-size sets of blue linelpaper as -built plans, (3) two complete sets of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) location stationing and swing ties of all utility stubs including draintile cleanouts, (6) bench mark network, (7) digital file of as -built plans in both Axf & .tif format (the Axf file must be tied to the current county coordinate system), (8) digital file of utility tie sheets in either .doc or .tif format, and (9) a breakdown of lineal footage of all utilities installed, including the per lineal foot bid price. The Developer is required to submit the final plat in electronic format. Z. As -Built Lot Surveys. An as -built lot survey will be required on all lots prior to the Certificate of Occupancy being issued. The as -built lot survey must be prepared, signed, and dated by a Registered Land Surveyor. Sod and the bituminous driveways must be installed before the as -built survey is completed. If the weather conditions at the time of the as -built are not conducive to paving the driveway and/or installing sod, a temporary Certificate of Occupancy may be issued and the as -built escrow withheld until all work is complete. Rev. 3/31/06 GC-10 CITY of CNANllASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone:952,227,1100 Fax:952.227.1110 Building Inspections Phone:952.227.1180 Fax:952.227.1190 Engineering Phone:952.227.1160 Fax:952.227.1170 Finance Phone:952.227.1140 Fax:952,227.1110 Park & Recreation Phone:952.227,1120 Fax:952.227.1110 Recreation Center 2310 Coulter Boulevard Phone:952.22Z1400 Fax:952.227.1404 Planning & Natural Resources Phone:952.227.1130 Fax:952.227,1110 Public Works 7901 Park Place Phone:952.227.1300 Fax:952.227,1310 Senior Center Phone:952.227.1125 Fax:952,227,1110 Website www.d.chanhasseruron.us MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Bob Generous, Senior Planner DATE: June 13, 2016 M SUBJ: Planning Case #2016-09 Lake Lucy Road — Rezoning, Subdivision with Variance PROPOSED MOTION "Chanhassen City Council approves rezoning of the property from Rural Residential, RR, to Single -Family Residential, RSF and preliminary plat approval for 12 lots, one oudot and public right-of-way with variances for the use of flag lots, cul-de-sac bubble size and a local street centerline offset of less than 300 feet and a building setback variance from the cul-de-sac bubble for lot 11 subject to the revised conditions of approval and adopts the findings of fact." City Council approval requires a majority vote of City Council. EXECUTIVE SUMMARY The applicant is requesting rezoning and subdivision approval to create a 12 lot single-family detached housing residential neighborhood. The proposed variances are from the subdivision ordinance: for the use of a flag/neck lot, cul- de-sac bubble size and for less than 300 feet offset from street centerlines; and from the zoning ordinance for the setback from the cul-de-sac bubble. PLANNING COMMISSION SUMMARY The Planning Commission held a public hearing on May 17, 2016 to review the proposed development. The Planning Commission voted five to one on a motion recommending that City Council approve the development. Issues of concern brought out at the Planning Commission were grading, storm water management and tree preservation. Specifically, there was concem about the creation of wet, rear yard areas through the grading of lots 6 — 9 and the use of retaining walls, and limiting the usability of the yard by the home owner. Staff has seen similar circumstances, The Preserve at Bluff Creek, where the use of retaining walls to alter the site to create lookout and walk out homes resulted in excessively wet conditions to occur. For lots 1 — 5, there was concern that storm water runoff would be greater than currently exists and that off -site discharge under Lake Lucy Road would be greater than currently occurs. There are specific modifications to the grading plan and Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow requirements for additional analysis that should alleviate these concerns and provide answers before that final plat may be approved. Staff would like to be assured that the post development discharge rates and volumes are at or below existing conditions. To address concerns about the western lots, staff has added the following condition, which was discussed as part of the report, but not included as a condition under Engineering: 4. The applicant shall revise lots 6-9 be a full -basement, rambler -style home. This condition should reduce some of the grading on the site, lessen the size or need for retaining walls and be more conforming to the existing land form. The applicant also submitted a "responses to staff recommendations". While they concurred with the majority of the recommended conditions, there were four that they requested be deleted. The discussion, their rational (blue type) and staff responses (red type) are attached to this report. Staff recommends that the conditions remain with modifications to Water Resources condition 3. 3. The stormwater management practices shall achieve a new overall reduction of at least 90% for total suspended solids and 60% for total phosphorous using industry accepted removal rates. This includes manipulation of the NURP50 Particle Distribution filtration efficiencies to match accepted literature values. Finally, the revisions to the plans may provide additional tree preservation opportunities, but staff does not want to accept current preservation if in the future, the home owner will be responsible for removal of the trees. The required grading revisions may provide additional areas that would be acceptable for the planting of trees throughout the development. Planning Commission minutes for May 17, 2016 are included in the consent agenda for the June 13, 2016, City Council packet. RECOMMENDATION Staff recommends approval of the rezoning and preliminary plat with variances for the use of flag lots, cul-de-sac bubble size and a local street centerline offset of less than 300 feet and a building setback variance from the cul-de-sac bubble for lot 11, plans prepared by Stantec, dated 5/6/2016, subject to the conditions of the Planning Commission staff report and adoption of the findings of fact. ATTACHMENTS Letter from Allan & Mary Weingart to City of Chanhassen dated May 17, 2016 Letter from Betsy Randall to City of Chanhassen dated May 18, 2016 Lake Lucy Road Responses to Staff Recommendations dated May 17, 2016 Planning Commission Staff Report Dated May 17, 2016 as revised. ALAN & MARY WEINGART May 17, 2016 TO: City of Chanhassen Chanhassen Planning Commission RE: Yosemite Holding, LLC Rezoning Request 1600 and 1630 Lake Lucy Road Planning Commission Members, Unfortunately, I will be unable to attend tonight's Planning Commission meeting due to a business conflict that has taken me out of town. I lieu of attendance, I wanted to express some concerns regarding the proposed development referenced above. First of all, I am NOT opposed to the development of the indicated property. Landowners have the right, within limits, to do what they want with their own land. The issue I have is when that development has a potential, and in this case likely, detrimental impact on neighboring properties. Mary and I are the owners of a portion of the property directly to the south of the subject development. We, along with the Kendall's and Randall's, own the property noted in the recent staff report as the "Southern Drainage Area". Our own property happens to be the 1800' driveway that extends from Lake Lucy Road out to the 11 acre so-called "island" in Lake Lucy. (We also have our primary residence down Lake Lucy Road and up Steller Court at 1685 Steller Court.) The Southern Drainage Area is made up primarily of wetlands, a portion of which I was required to mitigate when we put our driveway in back in 1999-2000. This is very low property that "holds" water for quite some time after heavy rains and/or snowmelt (when there used to be such a thing!). There is NO DRAINAGE from this basin into Lake Lucy or anywhere else, so the water accumulates and slowly percolates into the wetlands or evaporates ..... the only two options. The staff report makes an interesting observation when it says on page 6 that "Regardless of which path the drainage takes relative to the driveway; it all ends up in a third wetland with no constructed outlet although it appears that it does drain overland to Lake Lucy if it bounces approximately five (5) feet." (emphasis added). "Bounces .... 5... feet? I suspect that this is a technical engineering term of art, but I have never seen this occur in this area nor can I imagine such happening. I do, however, agree that the water would need to rise in that wetland basin about 5 feet BEFORE it would begin to make its way to Lake Lucy. AND, if that were the case, my driveway would be under water about 4'/z feet, along with the Kendall's home being partially flooded! The point being made here is that the prospect for southerly discharge of water is quite detrimental to the property owners that I have mentioned, and I would propose that our driveway would be the first property negatively impacted by such discharge. This potential for standing water that covers or degrades my driveway at the lowest point through these wetlands seriously impacts the value of my island property as it is the only means of reaching that 11 acre parcel. The staff report attempts to address the mitigation of this problem, but, in my opinion, raises more concerns than it resolves. The division of the development into "two major drainage area(s)" creates a significant area from which water will flow into the Southern Drainage Area. Some particularly troubling statements from the report are as follows: 1685 STELLER COURT, EXCELSIOR, MN 55331 Telephone: Work: (612) 376 4005 Mobile: (952) 239 5899 Home: (952) 474 6884 Email: Work: aweingart@doughertymarkets.com Home: alweingart@vi_9 com ALAN & MARY WEINGART ■ Page 6: When addressing my driveway, the report states, "nor does it appear designed to city standards." When I put this driveway in, it was certainly vetted and approved by the City and about 15 other state and federal agencies. Please review the records as this was not a renegade homeowner acting on his own! ■ Page 6: "Staff agrees that the lack of easement and infrastructure makes it untenable to send any additional runoff to the south. These property owners should not bear the responsibility for the stormwater management of the subject property." ■ Page 6: "The development of the site must not direct any additional volume of runoff to the south. Further, rates must not be increased over existing rates for any scenario." ■ Page 6: "The current plan...... still directs the majority of lots 1 through 7 to the south." ■ Page 6: Apparently, one solution is to "employ downspouts" to assist in the direction of the roof drainage to the north. Who is going to police this once the development is done? The staff report even questions this on page 7 when they add, "While this could work in principal, the practice of this will be difficult [to] implement, inspect and compel compliance." ■ Page 7: All of this leads staff to conclude that it is highly unlikely that more water is not being directed south than is claimed." ■ Page 7: "It is intuitive that a site, after mass grading, will be more compacted than under current conditions. Mass graded sites intentionally compact soils to increase strength for paved areas and building pads. This increase in compaction leads to an increase in bulk density and a decrease in soil porosity. This translates into an increase in the volume of water running off the site." These are just a few of the statements that staff has made throughout their thorough report that question the southerly flow of stormwater discharge and how this problem is being mitigated. The only potential solution that I can envision (and I am not an expert on these matters) is for the stormwater to be diverted: 1. To the eastern wetlands as is being proposed for the northern section of this development, 2. Through Pheasant Hills Park to the wetlands on the southerly side of that park north of Lake Lucy Lane, or 3. Down Lake Lucy Road to the west so that it ultimately drains into the wetlands to the west of Steller Court (admittedly, a difficult redirection). Having the stormwater from roughly half of this development flow to the Southern Drainage Area with no interruption (not even a holding pond) will be significantly detrimental to my property, and that of my neighbors, as well. And, any monitoring of this once the development has been done will be virtually impossible and unenforceable. Once again, I apologize for not being able to attend the May 17" Planning Commission meeting, but hope you will take our concerns under consideration in your assessment of this development. Thank you for your time and commitment to the City of Chanhassen as your task is not an easy one. Regards, 4��, 1685 STELLER COURT, EXCELSIOR, MN 55331 Telephone. Work: (612) 376 4005 Mobile: (952) 239 5899 Home: (952) 474 6884 Email: Work: aweingart�Jodoughertymarketscom Home: alweingart@visi.com May 18, 2016 To: City of Chanhassen Chanhassen Planning Commission Chanhassen City Council Re: Yosemite Holding, LLC Rezoning Request 1600 and 1630 Lake Lucy Road Planning Commission and Council Members, I attended the meeting Tuesday (5/17/16) evening and realized there was more that needed to be stated about my concerns regarding the drainage from the above rezoning and subdivision. The 100 year rain was mentioned by staff at the meeting last evening which I believe was stated at 6" in 24 hours, this seems to be happening more often than once in a 100 years. There have been many times in the past and will be more in the future when we get more than that in a few days of steady rain. Last fall (Oct. -Nov 2014) we received more than 6" in a few days of constant rain. My property received so much water that I could have had a skating pond over the winter on the area where the water ponds on the north side of my property. This "pond" greatly exceeded the "normal' high water markers placed on my property years ago. How can the currently proposed plat NOT increase drainage onto my and the adjoining properties when especially since the developer states they will have to haul in many tons of earth to do the proposed building of these homes. The current soil is basically clay which causes a lot of runoff so what type of soil will be brought in to reduce this? Staff mentions packing of the soil on the property as a concern. If soil compaction is done in the "usual' way it will be packed to densely and increase more drainage to the south. How will this be monitored or dealt with? Looking at the latest elevations (pages 4 and 6 of commission packet) of lots 1- 6 and possibly 7 the runoff to the south can only be more than present. How will the drainage be monitored to make sure it is not more than what currently drains south? Since there is no direct drain to Lake Lucy from mine or neighbor properties when the water has nowhere to go it backs up onto my property. There have been times in the 20 years I have owned this property that the northern part of my property has been basically inaccessible due to the amount of moisture there. This may be great to drown the wild garlic but also great for the mosquito population. I would like to see a comparison of the existing elevations compared to the proposed elevations for this project and have someone explain to my neighbors and me how the drainage to the south from current proposed preliminary plat will NOT increase due to the change. I will be out of town for the next few days but would like to take this opportunity to invite the council members, staff and whomever to come walk the properties on the south side of Lake Lucy Road after Memorial Day to really SEE the problem that could be caused if drainage into this area is increased at all! Bring your water boots... Sincerely, L2c:� Betsy (Kathryn) Randall 1571 Lake Lucy Road 952-474-6522 LAKE LUCY ROAD; NEW RESIDENTIAL NEIGHBORHOOD RESPONSES TO STAFF RECOMMENDATIONS to PRELIMINARY PLAT FLING. Planning Commission Meeting, Tuesday, May 17, 2016 We are in full agreement with 76 of 80 conditions of approval. Following the section labeled RECOMMENDATIONS on Page 19, there are seven topics, with conditions. Seventy six of these conditions are standard and typical of final plats, construction plans and details. We will accommodate all of these requests in our revised plans. Please see our responses to the following 4 conditions: Note —Three of these four items can be accommodated, but we would like to share some comments for your consideration. Because we are concerned that these conditions will either adversely impact environmental quality, impose added cost without any real benefit, we would like these conditions to be discussed, and ideally, removed as conditions of approval. Engineering Recommendation number 14 is a significant concern to us for the reasons described below. "Engineering: Condition 14. Retaining walls and entry monument... shall be relocated outside standard perimeter drainage and utility easement boundaries, excepting the retaining wall on Lots 5 and 6." Developer & Consultant Observation: The positions of the retaining walls on lots 5 and 6 serve the some function of assisting drainage, within the "drainage easements", as do the retaining walls on Lots 8, 9 and 10. The walls on each one of these lots is critical to the proper drainage and runoff flows, as well as sustaining a suitable area for home construction. Significantly, forcing the walls off of drainage easements, (specifically titled for such use), is an exceptional and unusual requirement that will cause harm. This would impose adverse effects on the functions and values of lots and inhibit drainage, while providing no benefits. We, therefore, request that this Engineering Condition #14 be deleted/ This condition will remain. Per Condition 14, the retaining wall on Lots 5 and 6 may stay inside the easement, but will require an encroachment agreement. That retaining wall must be under an encroachment agreement so that it can be removed when the properties to the west connect to the sanitary sewer near the wall. This is discussed further in the Utility Section of the staff report. For the other retaining walls, requiring them to be constructed outside of drainage and utility easements is not an "exceptional" or "unusual" requirement. The purpose of a perimeter drainage and utility easement is to provide an area for public and private utilities to access the lots and to provide a drainage way between the lots and set back from the building pads. The retaining wall locations proposed would inhibit these purposes. Retaining walls are neither drainage conveyances nor utilities and do not belong in a D&U Easement. The wall on Lot 9 is particularly problematic as maintenance of the wall would require encroachment onto Lot 10. The other three conditions we have concerns regarding are the following: We are being asked to move our entrance monument outside the drainage and utility easement. We have successfully placed entrance monuments within these easements throughout the Metropolitan Area. When they are carefully placed where they won't impede reasonable sight triangles these monuments cause neither transportation nor pedestrian safety problems. And, as long as coordination is done with the relevant utility companies, building, grading and landscape contractors, there is neither any interruption of utility lines nor any drainage problems with this placement. This condition will remain. The placement of the entrance monuments, as proposed, would be within a drainage and utility easement that is specifically dedicated for water and sanitary sewer pipe. When the City performs maintenance or replacement of these pipes, the monument would have to be moved at the expense and likely objection of the Homeowners Association. It is unacceptable to place an entrance monument within this drainage and utility easement, regardless of what the developer has done in other cities in the past. Additionally, the city does not permit monument signage within corner site triangles and would require any signage to be moved out of those site triangles. A. "Environmental Resources Condition: 2. All required plantings must be located on private property outside of public right of way..." Developer & Consultant Observation: Creating a new neighborhood provides an opportunity to introduce the trees that have the greatest visual impact on a city; its boulevard -street trees. Excluding street tree planting from a residential neighborhood's boulevards causes a loss of beauty, and future value gains, at the minor and marginal benefit of potentially, lower maintenance. We understand the value of some limitations on planting with regard to a main collector such as Lake Lucy Road. However, the accepted and typical, well vetted detail has street trees centered between the sidewalk and back of curb, or between the property line and back of curb. That is what our planting plan shows. In these times of tight municipal budgets, and the Emerald Ash Borer, the provision of street -boulevard trees, (conforming to city -approved tree species preferences), is a way to further beautify the city, while also improving the long term values, aesthetics and temperature moderations within new Chanhassen neighborhoods... without direct cost to the City. We, therefore, request that this condition #2 be deleted. The condition will remain. Trees planted on private property near the front property line will still provide a 'boulevard tree' feel to the street but be less exposed to damage from snow plow or sweeping operations as well as out of sight line and utility conflicts. B. "Water Resources: Condition 3: "... achieve a new overall reduction of at least 90% of total suspended solids .... This includes manipulation of the NURP50 Particle Distribution". Developer & Consultant Observation: The effect of these changes, (and proposed "manipulations" of generally accepted stormwater software input parameters), would result in multiple stormwater management devices. These would likely result in decreased removal efficiency and increase city maintenance obligations and costs. There is no ordinance standard that requires this requested change. The manipulation of these parameters will not likely advance the total management goals, they simply add redesign costs. We, therefore, request that this condition #3 be deleted. The condition will be modified to read as shown below. "The stormwater management practices shall achieve a net overall reduction of at least 90% for total suspended solids and 60% for total phosphorous using industry accepted removal rates. This includes manipulation of the NURP50 Particle Distribution filtration efficiencies to match accepted literature values." The condition was misstated. The NURP particle distribution remains unchanged. What must change is the efficiency with which the particle removals will occur. The default removal efficiencies assume that 100'% of the water is infiltrated to the water table. The proposed systems are designed to have a piped outlet (underdrain and/or surface flow) meaning there will be little to no infiltration. As such, the assumed removal efficiencies are incorrect and are incongruent with accepted literature values and overstate the removal of phosphorous and particulates from the runoff. Code requires that water quality standards of 90%TSS and 60% TP reduction are met. Section 19-144 reads as follows: (3) Newly constructed or modified detention basins shall provide storage volume below the outlet (dead storage) to allow for water quality treatment in accordance with the following, whichever is most restrictive: a. Water quality features meeting the MPCA NPDES construction permit for permanent stormwater management systems: b. Water quality treatment consistent with NURP criteria (90 percent removal of TSS and 60 percent removal of TP for a standard NURP particle size distribution) C. "Water Resources: 18: Efforts shall be made to raise the elevations of Lots 2 through 5 to assure positive flow towards the street and ultimately to the treatment devices. Developer & Consultant Observation: The grading design on the preliminary plat shows a graded pad that is larger than the actual home footprint. In any event, the grading design shows water being conveyed both to the street and, via side yards, to the rear yard and drainage swales. This is a common practice, and positive drainage will be provided. Building Requirement #4 on pg. 19, ensures that final grading plans for each lot and home will be in conformance before building permits are issued. The condition will remain. As presented, the high point is at the front of the building pads on the grading plan. As such, only the front yards will be directed towards the street. The remainder of the lots will discharge to the rear towards the area in question south of Lake Lucy Road. This is a development level issue and not a responsibility to be borne by the builder. In fact, it may be too late at that time to address drainage concerns. If the indicated pad size is the issue then I would suggest altering the pad size to accommodate the anticipated home. The watershed draining to the south must not only be limited to the greatest extent practicable but the assumed drainage areas must match what the proposed grading plan shows. �� t r M1 H a � CITY OF CHANHASSEN PROPOSED MOTION: PC DATE: May 17, 2016 C— CC DATE: June 13, 2016 REVIEW DEADLINE: July 30, 2016 CASE #: 2016-09 BY: RG, TH, TJ, ML, JM, JS, SS "The Chanhassen Planning Commission recommends that City Council approve rezoning of the property from Rural Residential, RR, to Single -Family Residential, RSF and preliminary plat approval for 12 lots, one outlot and public right-of-way with variances for the use of flag lots, cul- de-sac bubble size and a local street centerline offset of less than 300 feet and a building setback variance from the cul-de-sac bubble for lot 11 subject to the conditions of approval and adopts the findings of fact and recommendation." SUMMARY OF REQUEST: Rezoning from Rural Residential District (RR) to Single -Family Residential District (RSF), and preliminary plat with variances for a 12-lot single-family residential subdivision. LOCATION: 1600 and 1630 Lake Lucy Road APPLICANT: Yosemite Holding, LLC 4960 Sussex Place Shorewood, MN 55331 (952) 470 5121 tforbord@forbordusa.com OWNERS: Almond & Carolyn Krueger 1600 Lake Lucy Road Excelsior, MN 55331 PRESENT ZONING: Rural Residential, RR 2020 LAND USE PLAN: Residential Low Density Craig & Deanna Claybaugh 1630 Lake Lucy Road Excelsior, MN 55331 ACREAGE: 8.96 acres DENSITY: Gross: 1.33 units/ac.; Net: 1.88 units/ac. LEVEL OF CITY DISCRETION IN DECISION -MAKING: The city has a relatively high level of discretion in approving Rezonings because the city is acting in its legislative or policy - making capacity. A rezoning must be consistent with the city's Comprehensive Plan. The city's discretion in approving or denying a Preliminary Plat is limited to whether or not the proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these standards, the city must approve the preliminary plat. This is a quasi-judicial decision. The city's discretion in approving or denying a Variance is limited to whether or not the proposed project meets the standards in the Subdivision Ordinance for a variance. The city has a relatively high level of discretion with a variance because the applicant is seeking a deviation from established standards. This is a quasi-judicial decision. Notice of this public hearing has been mailed to all property owners within 500 feet. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 2 of 24 PROPOSAL/SUMMARY The applicant is requesting rezoning and subdivision approval to create a 12 lot single-family detached housing residential neighborhood. The proposed variances are from the subdivision ordinance: for the use of a flag/neck lot and for less than 300 feet offset from street centerlines. APPLICABLE REGULATIONS Chapter 18, Subdivisions Chapter 19, Water, Sewers and Sewage Disposal Chapter 20, Article XLI, "RSF" Single Family Residential District BACKGROUND The houses on the site were built in 1981 and 1961. Lake Lucy road was reconstructed as part of the 2005 Street reconstruction project. Site Constraints The high point on the property is in the northwest comer of the site with an elevation of 1032. The low point on the property is along the south property line at the culvert under Lake Lucy Road with an elevation of 994. The site contains two wetlands totaling 0.75 acres which are located in the north central and east central portions of the property. The site has a net canopy coverage of 65.5 percent. REZONING Alternatives The existing zoning of the property, Rural Residential, is not consistent with the land use designation of the property, Residential Low Density. The comprehensive plan allows less intensive land uses to remain in place. However, any approval by the city for development of the property must be consistent with the comprehensive plan. The following zoning districts would be consistent with a Residential Low Density land use: Single -Family Residential (RSF), Mixed Low Density Residential (R-4), Low and Medium Density Residential (RLM), and Planned Unit Development — Residential (PUD-R). The RSF district is the most appropriate zoning district to rezone this property since it is the same zoning as the surrounding residential properties and permits only single-family homes. While the R-4 district permits single-family homes, it also permits twin homes which would be inconsistent with the surrounding development. The RLM district permits single-family homes, as well as twin homes, townhouses and attached housing. But the RLM district also requires that large areas of upland be preserved or created as permanent open space to balance the higher hard surface coverage permitted on the individual lots. Finally, the PUD-R district can be created for a single-family subdivision, Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 3 of 24 but the PUD-R is intended to provide a reasonable and verifiable exchange or benefit to the community that is normally not accommodated through other zoning districts, e.g., enhanced environmental protection, affordable housing and enhanced quality of development. Staff is recommending the rezoning to RSF be approved. Comprehensive Plan Consistency The RSF zoning district is consistent with the Residential Low Density land use designation. The proposed rezoning assists in the furtherance of the following land use goals of the City of Chanhassen Comprehensive Plan: • Development will be encouraged within the MUSA line. The plan should seek to establish sufficient land to provide a full range of housing opportunities. Development should be phased in accordance with the ability of the city to provide services. The proposed rezoning assists in the furtherance of the following housing goals of the City of Chanhassen Comprehensive Plan: • A balanced housing supply with housing available for people of all income levels. • A variety of housing types for people in all stages of the life -cycle. The applicant is proposing a 12 lot single-family detached housing subdivision and two outlots served via public streets with a variance for the use of flag lots for lots 5, 8 and 9 and a variance for less than 300 feet offset from street centerlines. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 4 of 24 PRELIMINARY PLAT SITE CONSTRAINTS Wetland Protection The City of Chanhassen Wetland Inventory and the Minnehaha Creek Watershed Wetland Inventory both indicate the presence of two wetlands on the subject property. Sambatek reviewed and delineated the site in October of 2015. Staff reviewed and approved the delineation that same fall. The notice of decision was mailed on November 17, 2015. The applicant provided MNRAM and determined the northerly wetland to be manage classification 2 and the easterly wetland to be manage classification 1 requiring a 20 foot and 25-foot buffer respectively. Both wetlands require a 30 setback from the buffer for the principal structure. The plans show the appropriate buffers and setback. It is the City's practice to have wetlands and buffers placed into outlots to implement the no net loss goal. The city requires that all runoff is treated prior to discharge into a wetland. Treatment practices are being proposed for much of the drainage being directed to the wetlands. It is proposed that lots 8, 9 and 10 as well as the backs of lots 11 and 12 be treated via the wetland buffer. In those cases, where no other treatment opportunities are available filter strips may be utilized. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 5 of 24 The upland area between the two wetlands will need to be graded to allow for the bounce from the northern wetland to spill over into the eastern wetland. Work will also be required adjacent to the wetland area to install the outlet pipe under Yosemite. The SWPPP must address the potential for wetland impact and how impacts will be avoided. No materials or staging can occur within the wetland area. Any disturbed area within the buffers must be revegetated with native vegetation and a vegetation establishment plan must be provided. Bluff Protection There are no bluffs on the property. Shoreland Management The property lies approximately 225 feet beyond the shoreland overlay district for Lake Lucy. As such it will not be subject to shoreland requirements for land development. Floodplain Overlay This property does not lie with a floodplain. GRADING, DRAINAGE & EROSION CONTROL Site Grading: Drainage Under existing conditions, the site is divided into two major drainage area. A line that extends approximately from the southeast property comer to 150 feet south of the northwest comer divides the drainage areas. Everything north and east of that divide drains to one of two wetlands and is ultimately directed to the east through a new culvert to be installed under Yosemite. Southern Drainage Area Everything south and west of this divide drains to the south towards Lake Lucy. The drainage leaves the site via a culvert that goes under Lake Lucy Road and discharges onto private property to the south. The drainage then either goes through a twelve inch (12") corrugated metal pipe culvert under the private driveway which leads to the island on Lake Lucy or portion of the drainage travels past the culvert and follows an incised ditch along the drive to a wetland located on private property. A second twelve -inch (12") CMP culvert goes under the same drive at this location and appears to equilibrate the wetland with another wetland on the other side of the drive. It appears the drive at this Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 6 of 24 location is the low spot for the area and is prone to overtopping. Regardless of which path the drainage takes relative to the driveway; it all ends up in a third wetland with no constructed outlet although it appears that it does drain overland to Lake Lucy if it bounces approximately five (5) feet. None of this conveyance is under city easement nor does it appear designed to city standards. Staff has received email and voice correspondence from owners of four of the properties to the south that already receive runoff from the subject property. They all expressed great concern over directing additional runoff to the south. Staff agrees that the lack of easement and infrastructure makes it untenable to send any additional runoff to the south. These property owners should not bear responsibility for the stormwater management of the subject property. The development of this site must not direct any additional volume of runoff to the south. Further, rates must not be increased over existing rates for any scenario. The applicant must demonstrate to staff's satisfaction that this condition is met. The current plan iteration does reduce the drainage area but still directs the majority of lots 1 through 7 to the south. This area is currently wooded with two houses and a small lawn area. Under proposed conditions, the area will be mass graded and will be dominated by shallow rooted Kentucky bluegrass and roof. It appears rates can be addressed with the proposed southern management practice but volumes are still suspect. The high points of lots 1 through 4 are at the front of the building. The high point of lot 5 is at the north east corner of the building envelope. This means that in these lots, everything from the front of the building envelope to the back yards drains to the south. In an effort to direct more of the roof drainage north and away from the affected properties to the south, the applicant is proposing to employ down spouts to aide in this conveyance. This was discussed with staff at a meeting as a possible solution. � •. . II� �1 1 -�I Wn 1147 Iq WO MFF7Q22,66 wp B ' ; ! �'0./. ' i ' I .. ` -� n FL•ryl�iuv I•'_. - Rslam$ ,: fit. `/¢ M7 ^* F'1i.1- RFG 1012.S 1aa'. 7lSj AR.E4 DRAINING 194 Wo AP.EA DROAG '00"r .., 1 TC SOUTH to '1' M`F lets,% �i,':! `-TDNOR.TH 74S1 MIT 1021. L _ I!Tts1o:7.25 `AFG 1011.75 } _ _rm±rc�ntaae� Figure 2. Drainaae boundaries for lots 1 through 5 based upon proposed grading which indicates the majority of the ores still will drain south. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 7 of 24 While this could work in principal, the practice of this will be difficult implement, inspect and compel compliance. In addition to enforcing compliance, it may be problematic depending upon the house design. Property owners may also look at the drainage feature in the backyard and feel that it is a more appropriate area to direct their roof runoff. All of this leads staff to conclude that it is highly unlikely that more water is not being directed south than is claimed. In addition, staff does not agree with the assumptions used to determine the composite curve numbers. It is intuitive that a site, after mass grading, will be more compacted than under current conditions. Mass graded sites intentionally compact soils to increase strength for paved areas and building pads. This increase in compaction leads to an increase in bulk density and a decrease in soil porosity. This translates into an increase in the volume of water running off the site. The submittal assumed that bulk densities would remain the same after completion of mass grading as they are under the current conditions. Without a soil management plan indicating how bulk density will be reduced after completion of grading, staff feels this assumption to be erroneous and the composite curve number post development will be significantly higher than under existing conditions. The area should be modeled assuming soils in the C hydrologic group under existing conditions (which matches the published soil survey) and in the D hydrologic group post development. Staff recalculated runoff using assumptions based upon the above discussion and concluded that while it is likely that under the 100 year return frequency events runoff volumes will decrease to the south, volumes will increase under the 10 year return frequency event. The 2 year return frequency event remains has a slight but negligible increase in volumes over existing conditions. The applicant shall revise the plans to assure that there is no increase in runoff rates or volumes to the south. Table 1. Composite Curve Number (CN) Calculation for Existing Conditions. LAND COVER AREA (Acres) CN SUM Impervious Area 0.14 98 13.72 Woods (Good condition w/ C soils) 2.54 70 177.8 Open Space (Good w/ C soils) 1.02 74 75.48 COMPOSITE CURVE NUMBER 3.70 72 Table 1. Composite Curve Number (CN) Calculations for Proposed Conditions and Assumed Additional Drainage Area. LAND COVER AREA (Acres) CN SUM Impervious Area 0.75 98 73.5 Open Space (Good w/ D soils) 1.78 88 142.4 COMPOSITE CURVE NUMBER 2.53 85 Table 3. Runoff Volume by Storm Event Pre- and Post -Development. EXISTING RUNOFF CN = 72 PROPOSED RUNOFF 2 YEAR 0.231 AF 0.232 AF 10 YEAR 0.518 AF 0.576 AF 100 YEAR 1.286 AF 1.189 AF Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 8 of 24 As an alternative, the applicant could demonstrate that bulk densities are no greater than existing conditions by providing penetrometer data for current conditions and post development and comparing them to some reference such as the NRCS Soil Quality Institute's 1999 findings. If the bulk densities are found to be elevated post -development the developer would be responsible for correcting the soils. Cul-de-sac Drainage A low spot exists at the 3 o'clock position on the proposed cul-de-sac. It is staffs preference that this low spot be removed and that positive drainage take place toward the east. The applicant's engineer feels this is not practicable and instead proposed to install a sump manhole at this location to discharge water to the wetland buffer. Drainage of Lots 6-10 In an effort to force look outs onto these lots, several issues are created, including drainage issues. Both lot 7 and lot 8 have drainage shed directly at the structures. This is an unacceptable condition. Because of the swales necessary for conveying water out of the backyards, nearly the entire backyard of lots 6 and 9 will need to be under a drainage and utility easement. This will preclude almost any landscaping as that would have a strong likelihood of creating impoundment conditions on the upstream properties. If these lots were made into full basement units it is possible that less water would be directed south, that greater treatment could be achieved and the likely drainage issues could be avoided. Outlot Drainage The proposed biolfiltration feature has a 100-year high water elevation of 1008.11. It appears that this will bounce into lot 12. Given the nature of this facility, frozen conditions and sediment deposition will decrease the available pore space and can result in increased flood elevations. No emergency overflow has been provided and the plan view does not show the vertical or horizontal placement of the underdrain. The applicant will need to create an overflow between the northern wetland and the southeastern wetland. This must be stabilized and a vegetation restoration plan must be developed. The plans shall indicate that no wetland impacts, including but not limited to the placement of soils and the operation of equipment within the wetland can occur. In addition to the above discussion the following observations were also made pertaining to the grading and drainage plan: Based on the building pads shown, the hardcover area generating stormwater runoff on Lots 1-4 and 6-10 exceed the 25% maximum without taking the driveways into account. Many greatly exceed 25% and go as high as 37% hardcover. The applicant shall include a chart with the maximum hardcover allowed on each lot. The lots shall be graded to drain away from proposed building locations. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: Lot 6 backyard, Lot 7 backyard, the east side of Lot 1, the highpoint of the side yard of Lot 10. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 9 of 24 Lots 3, 4 and 5 on the southern half of the property show little level back yard area. This may be problematic for future owners of these lots as there is often an expectation to have a level backyard area for recreational use. In the proposed plan, Lots 6-9 have been artificially created as walkouts through construction of three retaining walls 5-9 feet tall and routing stormwater through the center of their backyard at a shallow slope. This will likely be problematic for future owners of these lots as there is often an expectation to have a level, dry backyard area for recreational use. The drainage area shall be covered with a drainage and utility easement which shall preclude the residents from landscaping or construction of sheds or pools in a large portion of their yard. Staff recommends lots 6-9 be a full -basement, rambler -style home, as this would fit better with the grading on surrounding properties and allow the applicant to create more effective drainage for these lots, rather than excavating down and constructing retaining walls to force a walk -out style home onto the lot. The drainage path on the sideyard of Lot 10 is narrow between the building pad and the retaining wall on Lot 9. The applicant shall move the retaining wall out of the perimeter drainage and utility easement so the easement area can function as the drainage way. The grading plan shall be revised to show a spot elevation at the centerline of the driveway where it meets Street A. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9. The southern basin shows an Emergency Overflow (EOF) onto Lake Lucy Road, a collector roadway. To minimize additional stormwater runoff created by long driveways required for the "flag" or "neck" lot variance, the applicant's plans show proposed 10-foot driveways for the length of the "neck". The applicant shall identify the discharge point of the culvert shown on the existing topography near the existing driveway of 1600 Lake Lucy Road. If it is a driveway culvert, the applicant shall have it removed or bulkhead and abandoned. Erosion Prevention and Sediment Control The proposed development will exceed one (1) acre of disturbance and will, therefore, be subject to the General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit). The applicant shall prepare a Surface Water Pollution Prevention Plan (SWPPP) and submit to the city for approval prior to final plat review and approval. The SWPPP is a required submittal element for preliminary plat review. No earth disturbing activities may occur until an approved SWPPP is developed. This SWPPP shall be a standalone document consistent with the NPDES Construction Permit and shall contain all required elements as listed in Parts III and IV of the permit. The city has a checklist which they will make available to the consulting engineer. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 10 of 24 Retaining Walls The applicant has proposed four retaining walls as part of this subdivision. The retaining wall on the western property line of Lot 8 is approximately 55 feet long and 5 feet tall. The wail is approximately 30 feet from the building pad, and the backyard of Lot 8 is below the wall. The north retaining wall on Lot 9 is approximately 110 feet long and 7 feet tall. This wall is approximately 14 feet from the side of the Lot 9 building pad with a drainage swale between the pad the and wall. The sideyard of Lot 9 is below the retaining wall. Staff recommends this wall be eliminated or reduced in size by changing the home style of Lots 8 and 9 to ramblers. (See the grading section for more information about this recommendation.) The retaining wall on the eastern property line of Lot 9 is approximately 80 feet long and 5 feet tall. The building pad of Lot 10 is 12 feet east of the wall and sits below the wall. Top and bottom wall elevations shall be shown for this retaining wall. This wall shall be relocated outside the drainage and utility easement. The retaining wall at the comer of Lots 5 and 6 is approximately 125 feet long and 9 feet tall. The sideyard of Lot 5 and the backyard of Lot 6 are below this wall. This wall crosses the lot line and thus is on both Lot 5 and 6. Any wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA). The development plans shall call out the material of the retaining wall. The following materials are prohibited for retaining wall construction: smooth face, poured in place concrete (stamped or patterned is acceptable), masonry, railroad ties and timber. Boulder walls shall not be taller than six feet. STORMWATER MANAGEMENT Article VII, Chapter 19 of City Code describes the required storm water management development standards. Section 19-141 states that "these development standards shall be reflected in plans prepared by developers and/or project proposers in the design and layout of site plans, subdivisions and water management features." These standards include abstraction of runoff and water quality treatment resulting in the removal of 90% total suspended solids (TSS) and 60% total phosphorous (TP). The applicant is proposing the construction of two (2) biofiltration features to treat runoff from a portion of the subject property. The plan, as submitted, does not provide any structural BMPs as stormwater practices to treat the runoff from lots 8 through 10. Instead, the plan will employ a backyard swale and the wetland buffer as a water quality treatment features. The modeled design removal efficiencies for all storm water management practices were considerably greater than the values recognized by the Minnesota Stormwater Manual and other industry standards. In reviewing the input settings for the P8 model, it was observed that the model was left in its default mode which assumes that there is complete infiltration to the water table. That is to say that none of the water leaves the site. This is clearly not the case for these Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 11 of 24 features and, as such, the NURP50 Particle Distribution should be adjusted to more accurately reflect the site conditions and literature values. The applicant must achieve the 90% TSS and 60% TP removal using removal efficiencies recognized as industry standards or otherwise justifiable. On April 27, 2016 staff had a conference call with the consulting engineers for the applicant. They would enhance the functionality of the filtration basins through the incorporation of iron filings, pretreatment devices or some combination thereof. It is proposed that the south filtration basin will be drained through an outlet structure to be constructed which will replace the existing corrugated metal pipe culvert. The water is then picked up by a series of ditches and corrugated metal pipe culverts all under private ownership before discharging into an apparently landlocked basin at 1571 Lake Lucy Road. There is no easement over this basin or the aforementioned conveyance. Staff is concerned that any increase in water volume may have the unintended consequence of creating additional scour conditions and increasing the size of this wetland. Staff is also concerned about performance and maintenance of the conveyance system that is not under City control and has not been modeled hydraulically or hydrologically. These concerns have been discussed with the applicants consulting engineer. They have provided calculations suggesting that they are not increasing rates or volumes to this area. However, as was discussed in the section on drainage, staff is not convinced this is the case. Staff is concerned about the long term viability of the southern biofiltration basin given the location on private property. The applicant will need to prepare an operations and maintenance manual for the features including inspection schedule. The applicant will need to form a Home Owners' Association to assume ownership and responsibility for the maintenance of any landscaping the HOA may wish to have. The city will assume responsibility for the underdrains, refreshing the iron filings and any piped storm sewer conveyance into or out of this feature. The development contract shall reflect this and a drainage and utility easement shall be recorded over the feature and any conveyances. The eastern biofiltration basin will be within an outlot dedicated to the city. The city will assume ownership of this basin upon satisfaction that it has been built to design specifications. Storm Water Utility Connection Charges Section 4-30 of code sets out the fees associated with surface water management. A water quality and water quantity fee are collected with a subdivision. These fees are based on land use type and are intended to reflect the fact that more intense the development type, the greater the degradation of surface water. These fees can be credited up to 50% if the design has a reasonable expectation of achieving abstraction of the first 1.1 inches of runoff from all proposed hardcover on the site. As this development will not be employing any infiltration or re -use practices, no credit will be applied. The wetland and buffer and upland area put into the outlot will be removed from the assessed property. This area is 1.60 acres so the net assessable land area is 7.36 acres. Based upon the area and land use type, the Storm Water Utility Connection Charge is estimated to be $8,000/acre x 7.36 acres = $58,880. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 12 of 24 RIGHT-OF-WAY, STREETS AND EASEMENTS The survey included all easements and right of way shown on the title search of the property dated November 20, 2015 from Stewart Title Guarantee Company. The applicant shall have their survey confirm this with a recent title survey before final plat. The applicant proposes a 60-foot right-of-way over Street A and 60-foot right-of-way radius over the cul-de-sac bubble. The plat maintains the existing, 66-foot right-of-way easements for Lake Lucy Road and Yosemite Avenue. Easements over drainage swales, basins and storm water pipes shall be called out as "Drainage and Utility" easements. Retaining walls and an entry monument are proposed within City easements. These elements shall be relocated outside of the standard perimeter drainage and utility easement boundaries. The retaining wall on Lots 5 and 6 requires an encroachment agreement. The preliminary plat shows a signage easement on Lot 1. This shall be a paper easement between Lot 1 and the development's HOA. Per § 18-78, staff and the applicant examined providing future access for adjacent properties to the west, 1650 and 1670 Lake Lucy Road. However, it is uncertain how these properties would develop in the future and what type of legal encumbrance Lot 5 would require. Staff recommends 1650 and 1670 have access off of Lake Lucy Road when they develop in the future. STREETS, DRIVEWAYS & SIDEWALK The applicant proposes construction of a public street, Street A. The applicant shall name this street with coordination with the Fire Marshall prior to submittal for final plat review. Street A is proposed to City standards at 31 feet wide and using the Chanhassen Standard Detail typical section. The applicant shall include the horizontal alignment tabulation for Street A in the plans. Access to the subdivision from Street A is located south of the southeastern wetland. This location was chosen after examining three locations: off of Lake Lucy Road, Yosemite Avenue north of the wetland, and Yosemite Avenue south of the wetland. The Lake Lucy Road intersection alternative was eliminated because of sight -distance concerns around the curve on Lake Lucy Road and the desire for access control on Lake Lucy Road, a Major Collector roadway. The Yosemite Avenue access north of the wetland was eliminated due to environmental concerns from running a roadway between the two wetlands across their EOF point and future maintenance concerns due to a long road extension that is surround by wetland instead of servicing properties. The applicant is applying for a variance to the requirement of 300-foot spacing between local roads per § 18-57. The access location on Yosemite, south of the wetland reviewed using engineering discretion and the guidelines set forth in the 2030 Comprehensive, the proposed intersection offset seems reasonable as the proposed 12 lot subdivision would generate less Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 13 of 24 traffic than a multiple commercial driveway. The applicant's engineer completed a queuing analysis to confirm that traffic queuing to make a left turn into the proposed development would not affect the function of the Lake Lucy Road & Yosemite Avenue intersection. The developer shall show construction limits for utility work below Yosemite Ave and submit a staging and restoration plan with their final plat submittal. A street light shall be installed at the intersection of Street A and Yosemite Avenue. Driveways shall be shown on the plan in the final plat submittal. Driveways shall be designed to meet all standards in City Code §20-1122. To minimize additional stormwater runoff created by long driveways required for the "flag" or "neck" lot variance, the applicant's plan propose 10- foot driveways for the length of the "neck". The sidewalk does not continue north of Street A, therefore the pedestrian ramp at the intersection of Street A and Yosemite Avenue is not required. The pedestrian ramp on the northwest comer of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. UTILITIES Sanitary Sewer The applicant proposes an 8" PVC sanitary sewer main to be owned and maintained by the City, due to the elevation of the adjacent sanitary sewer system on the east side of Yosemite, sanitary sewer for this subdivision does not meet the minimum depth required without insulation. The sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. The sanitary services may also need insulation. The proposed shallow elevation of the sanitary sewer also necessitates Lot 1-4, 11, 12 to use a private, in -home grinder system to pump waste to the public sanitary main which is a gravity flow system. The portion of the grinder pump services that lies within the right-of-way shall be gravity -flowing. Staff recommends the applicant examine at moving the sanitary service on Lot 12 further east to make a gravity service functional. Per § 18-78, the applicant proposes to install sanitary sewer main to the western property boundary to provide future extension to the adjacent properties: 1650 and 1670 Lake Lucy Road. It is unlikely they would be able to connect a gravity system to the sanitary main extension and would likely require private grinder pump systems. The retaining wall would need to be removed at the time of connection to the adjacent properties at the connecting parry's expense. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. SMH 5 shall be moved to be centered between the building pads for Lots 5 and 6. The sanitary services within the cul-de-sac bubble shall be revised to eliminate bends and cleanouts within the right-of-way. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 14 of 24 The utility plan sheet shall be revised to call out the City of Chanhassen as the local authority in Note 13. Water main The applicant proposes an 8" water main system. The plans shall call out C900 material for the water main pipe. The sanitary sewer/water main crossing on Lot I may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. Two additional hydrants shall be installed, one at the intersection of Street A and Yosemite Avenue and one at Station 3+00 of Street A. ASSESSMENTS Water and sewer partial hook-ups are due at the time of final plat. The partial hook-up fees will be assessed at the rate in effect at that time. LANDSCAPING AND TREE PRESERVATION I 111 11 v J. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 15 of 24 The following calculations were based on plans dated 4/1/16. Since that time, revisions to the grading plans have been made and not reflected in the tree preservation plans. The applicant must submit a revised tree preservation and landscaping plan before final approval. The applicant for the Lake Lucy Road property development has submitted tree canopy coverage and preservation calculations. They are as follows: Total upland area (excluding wetlands) 7.3 ac. or 318,928 SF Baseline canopy coverage 65% or 208,807 SF Minimum canopy coverage required 46% or 146,706 SF Proposed tree preservation 14% or 45,692 SF. The developer does not meet minimum canopy coverage for the site; therefore, the applicant must bring the canopy coverage on site up to the 46% minimum. The difference between the required coverage and the remaining coverage is multiplied by 1.2 for total area to be replaced. One tree is valued at 1,089 SF. Minimum canopy coverage to be replaced 121,216 SF Total number of trees to be planted II I trees The applicant has proposed a total of 66 trees, located in the front yard of each lot and in the bufferyards. Ordinance requires that at least 75% of the required trees be overstory species. The applicant has proposed 50 overstory trees. To meet minimum requirements at least 83 trees shall be overstory and the remainder can be understory species. The applicant is required to provide bufferyard plantings along Lake Lucy Road. Bufferyard requirements are as shown in the table: Landscaping Item Required Proposed Bufferyard B — South 10 overstory trees 7 overstory trees property line, Lake Lucy 21 understory trees 30 understory trees Rd., 540', 15' width 32 shrubs 37 shrubs Applicant does not meet bufferyard landscaping requirements for overstory trees. The applicant shall meet minimum requirements for bufferyard plantings. PARKS & RECREATION The site is adjacent to Pheasant Hill Park on its western border. This adjoining neighborhood park is 10.87 acres in size and was acquired by the city in 1990. COMPREHENSIVE PLAN — PARKS AND OPEN SPACE The quality and number of recreational facilities in a community directly contributes to its quality of life. For this reason, the City of Chanhassen places a strong emphasis on parks and open space. As the City of Chanhassen has developed and increased in population, more pressure and attention has Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 16 of 24 been given to providing recreational opportunities for our residents. Increased leisure time, health awareness, greater mobility, and high disposable incomes have all contributed to the increased demand for recreational activities. The challenge of the next century will be to provide facilities for a growing and diverse population. Parks can be defined as public areas that provide active or passive -oriented recreational facilities. A significant characteristic of parkland is its accessibility to its users. Open space is any parcel that is not used for buildings or other structures and is left in a natural state. Parks and open space perform diverse functions such as meeting physical and psychological needs, enhancing and protecting the resource base, enhancing real estate values, and providing a positive impact on economic development. COMPREHENSIVE PARK PLAN The city's comprehensive park plan calls for a neighborhood park to be located within one-half mile of every residence in the city. Pheasant Hill Neighborhood Park is located immediately to the west of the proposed subdivision. Pheasant Hill Park, at almost 11 acres in size, offers both passive and active recreation space in addition to extensive natural open spaces. The park features a children's playground, half -court basketball, open play field, picnic shelter, and neighborhood trail connections. Area residents will gain access from Street "A" to Pheasant Hill Park from a developer installed 8- foot wide pedestrian trail that will be maintained by the city and open throughout the year. Additional acquisition of public open space through the application of park dedication requirements is not recommended as a condition of the subdivision. COMPREHENSIVE TRAIL PLAN Residents purchasing homes within the new subdivision will have convenient access to the Lake Lucy Road pedestrian trail via a developer installed public sidewalk to be located on the eastern border of Lot 1. Construction of additional sections of the city's comprehensive trail plan is not recommended as a condition of the subdivision. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 17 of 24 MISCELLANEOUS Applicant must submit proposed street name to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval. Two addition fire hydrants will be required: one at the south/west corner of Yosemite and Street "A" and the second one on the south side of street "A" by Sta.3+00. A three-foot clear space shall be maintained around fire hydrants. Street sign(s) (temporary allowed) shall be installed prior to building permits being issued. Fire Marshal must approve signage. Prior to combustible home construction fire apparatus access roads capable of supporting the weight of fire apparatus shall be made serviceable. An additional address number will be required for lot #9. Its location shall be at the entrance of the private driveway. Sign location and size must be approved by the Fire Marshal. Prior to combustible construction fire hydrants shall be made serviceable. No burning permits will be issued for tree/ brush removal. The applicant must provide a 1:200 "clean" plat drawing. Demolition permits required for the removal of any existing structures. Buildings may be required to be designed by an architect and/or engineer as determined by the Building Official. A final grading plan and soils report must be submitted to the Inspections Division before permits can be issued. Retaining walls over four feet high require a permit and must be designed by a professional engineer. Each lot must be provided with separate sewer and water services. The applicant and or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. COMPLIANCE TABLE Area (sq. ft.) Width (ft.) Depth (ft.) Hard Cover % /sq. & Notes Code 15,000 90 125 25 / 3,750 Lot 1 20,678 132 148 5,169 Street frontage on three sides Lot 2 16,063 92 177 4,015 Lot 3 18,538 90 206 4,634 Lot 4 24,712 95 235 6,178 Lot 5 25,795 30@ 218 6,449 Flag lot, area of neck excluded. Front lot line is north prop. line Lot 6 18 254 90 176 4,563 Lot 7 15,465 90 172 3,866 Lot 8 15,146 60 153 3,786 Fla lot, front lot line east Lot 9 16,034 37 155 4,008 Fla lot, front lot line east Lot 10 19,054 99 188 4,763 Wetland to east Lot 11 19,002 161 209 4,750 Wetland to north Lot 12 17,794 101 195 4,448 Wetlands north and east 0 of 1 78,893 Manage 1& 2 Wetland, Bio filter, 1.81 ac. ROW 80,316 1.844 ac. Total 390,563 8.96 acres @ 30 feet width for flag lots Setbacks: 30 feet front and rear; 10 feet side; 30 feet wetland buffer Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 18 of 24 VARIANCE The development will require a variance to the code. The applicant's variance request is for the use of flag lots and a local street centerline offset of less than 300 feet. Flag lots may be permitted in residential districts with a density of less than four units per acre, if the criteria in variance Section 18-22 are met and upon consideration of the following: (1) The prevailing development pattern makes it unfeasible or inappropriate to construct a public/private street. In making this determination, the city may consider the location of existing property lines and homes, local or geographic conditions and the existence of wetlands. A separate street to access individual lots would add significantly to site hard cover and would not increase accessibility. (2) After reviewing the surrounding area, it is concluded that an extension of the public or a private street system is not required to serve other parcels in the area, improve access, or to provide a street system consistent with the comprehensive plan. Public street extension is not necessary to access properties to either the north or west. (3) The use of a flag lot will permit enhanced protection of the city's natural resources, including wetlands and protected areas. As an enhancement for environmental protection, the applicant shall include the northeast portion of proposed Lot 12 in one outlot to encompass both the wetlands and the tree preservation area. It should be noted that the Shadow Ridge development, approximately 350 feet east of this development, was developed with the use of flag lots in a very similar configuration to the proposed development: a cul-de-sac street with one curve and a wetland off one side of the cul- de-sac bubble. Section 18-57 requires that local street centerline offset of 300 feet. The local street centerline offset of less than 300 feet is due to the location of the wetland on the east side of the development that would not permit the street to be moved father to the north. Staff and the applicant looked at locating the street between the two wetlands, however that alignment had potentially detrimental impacts to the wetlands and resulted in additional site development concerns. Staff is also supporting a variance from the cul-de-sac bubble for Lot 11 to permit the house to encroach within 20 feet of the cul-de-sac right-of-way. The 30 feet setback still applies from the right-of-way not included in the cul-de-sac bubble which projects 50 feet into the lot due to the bubble off -set. This variance in conjunction with the cul-de-sac bubble reduction permits the development to incorporate storm water improvements to the east of lot 12. Additionally, the applicant is requesting that the city designate the east lot line of lot 9 as the front lot line. City code states "The front yard shall be the lot line nearest the public right-of-way that provides access to the parcel". However, this configuration would require that they create a lot layout and house orientation that would not be in keeping with the house placement on lots 6 through 8 and would create a long and thin, 40 wide, building pad. The city may as part of the variance request designate appropriate house pad configurations. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 19 of 24 Ili u11 uIW 1 4:11YC07� Staff recommends that the Planning Commission approve the rezoning and preliminary plat with variances for the use of flag lots, cul-de-sac bubble size and a local street centerline offset of less than 300 feet and a building setback variance from the cul-de-sac bubble for lot 11, plans prepared by Stantec, dated 5/6/2016, subject to the following conditions and adoption of the findings of fact and recommendation: Buildine: 1. Provide a 1:200 "clean" plat drawing. 2. Demolition permits required for the removal of any existing structures. 3. Buildings may be required to be designed by an architect and/or engineer as determined by the Building Official. 4. A final grading plan and soils report must be submitted to the Inspections Division before permits can be issued. 5. Retaining walls over four feet high require a permit and must be designed by a professional engineer. 6. Each lot must be provided with separate sewer and water services. 7. The applicant and or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. Engineering: 1. The applicant shall include a chart with the maximum hardcover allowed on each lot. 2. The lots shall be graded to drain away from proposed building locations. 3. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: Lot 6 backyard, Lot 7 backyard, the east side of Lot 1, the highpoint of the side yard of Lot 10. 4. The applicant shall revise lots 6-9 be a full -basement, rambler -style home. 5. The grading plan shall be revised to show a spot elevation at the centerline of each driveway where it meets Street A. 6. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 20 of 24 7. The applicant shall identify the discharge point of the culvert shown on the existing topography near the existing driveway of 1600 Lake Lucy Road. If it is a driveway culvert, the applicant shall have it removed or bulkhead and abandoned. 8. The plans shall identify the areas intended for stockpiling materials on site during construction. 9. Top and bottom wall elevations shall be shown for the retaining wall on the eastern property line of Lot 9. 10. Any retaining wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA). 11. The development plans shall call out the material of the retaining wall. The following materials are prohibited for retaining wall construction: smooth face, poured in place concrete (stamped or patterned is acceptable), masonry, railroad ties and timber. 12. Boulder walls shall not be taller than six feet. 13. The applicant shall have their surveyor confirm all easements and right of way shown with a recent title survey before final plat. 14. Easements over drainage swales, basins and storm water pipes shall be called out as "Drainage and Utility" easements. 15. Retaining walls and an entry monument are proposed within City easements. These elements shall be relocated outside of the standard perimeter drainage and utility easement boundaries, expecting the retaining wall on Lots 5 and 6. 16. The retaining wall on Lots 5 and 6 requires an encroachment agreement. 17. The preliminary plat shows a signage easement on Lot 1. This shall be a paper easement between Lot 1 and the development's HOA. 18. The applicant shall name Street A with coordination with the Fire Marshall prior to submittal for final plat review. 19. The applicant shall include the horizontal alignment tabulation for Street A in the plans. 20. The developer shall show construction limits for utility work below Yosemite Ave and submit a staging and restoration plan with their final plat submittal. 21. A street light shall be installed at the intersection of Street A and Yosemite Avenue. 22. Driveways shall be shown on the plan in the final plat submittal. 23. Driveways shall be designed to meet all standards in City Code §20-1122. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 21 of 24 24. The sidewalk does not continue north of Street A, therefore the pedestrian ramp shall not be constructed at the intersection of Street A and Yosemite Avenue. 25. The pedestrian ramp on the northwest comer of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. 26. The sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. T 27. The portion of the sanitary services that lies within the right-of-way shall be gravity -flowing. 28. The sanitary sewer/water main crossing on Lot I may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 29. SMH 5 shall be moved to be centered between the building pads for Lots 5 and 6. 30. The sanitary services within the cul-de-sac bubble shall be revised to eliminate bends and cleanouts within the right-of-way. 31. The utility plan sheet shall be revised to call out the City of Chanhassen as the local authority in Note 13. 32. The plans shall call out C900 material for the water main pipe. 33. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 34. Two additional hydrants shall be installed, one at the intersection of Street A and Yosemite Avenue and one at Station 3+00 of Street A. 35. Water and sewer partial hook-ups are due at the time of final plat. The partial hook-up fees will be assessed at the rate in effect at that time. Environmental Resources: A revised tree preservation plan and calculations must be submitted to the city prior to final approval. 2. All required plantings must be located on private property outside of public right-of-way. The landscape plan shall be changed to reflect this requirement. 3. Ash trees shall be removed within the proposed tree preservation area. Removals shall be directed by the city. 4. A revised landscape plan with a detailed plant schedule listing quantities for each individual species shall be submitted to the city before final approval. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 22 of 24 5. The proposed tree preservation area in the northeast corner of the development shall be incorporated into outlet including wetlands. Fire: 1. Proposed street name will be submitted by the applicant to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval. 2. Two addition fire hydrants will be required: one at the south/west corner of Yosemite and Street "A" and the second one on the south side of street "A" by Sta.3+00. 3. A three-foot clear space shall be maintained around fire hydrants. 4. Street sign(s) (temporary allowed) shall be installed prior to building permits being issued. Fire Marshal must approve signage. 5. Prior to combustible home construction fire apparatus access roads capable of supporting the weight of fire apparatus shall be made serviceable. 6. An addition address number will be required for lot #9. Its location shall be at the entrance of the private driveway. Sign location and size must be approved by the Fire Marshal. 7. Prior to combustible construction fire hydrants shall be made serviceable. 8. No burning permits will be issued for tree/ brush removal. Parks: 1. Full park dedication fees for 10 lots shall be collected per city ordinance in lieu of requiring parkland dedication. 2. Dedication of a 20-foot wide trail and a utility and drainage easement between lot 7 and lot 8. 3. Planning, engineering, and construction per city standards of an 8-foot wide bituminous trail within this easement connecting public Street "A" and Pheasant Hill Park. 4. Relocation of the public sidewalk to the south side of Street "A". Plannin¢: 1. The front lot lines for lots 5 shall be the north property line, for lots 8 and 9 the east lot lines. 2. The entry monument may not be located within the right-of-way and must be located outside of the sight triangle. A sign easement shall be dedicated where the monument sign will be located. Water Resources: 1. Runoff rates and volumes cannot be increased to the south. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 23 of 24 2. Curve numbers and drainage areas shall accurately reflect pre and post -construction conditions. 3. The stormwater management practices shall achieve a new overall reduction of at least 90% for total suspended solids and 60% for total phosphorous using industry accepted removal rates. This includes manipulation of the NURP50 Particle Distribution filtration efficiencies to match accepted literature values. 4. The sump manhole and SAFL Baffle shall not be included in the P8 model as the P8 model already assumes pretreatment. 5. All sumps with SAFL baffles shall be a minimum of 3 feet in depth. 6. The applicant shall prepare and submit a Surface Water Pollution Prevention Plan that contains all required elements from Parts III and IV of the NPDES/SDS Construction Permit. This shall be a standalone document. 7. Any disturbance of the buffer areas shall be restored with native vegetation appropriate to the area and the plans shall note this and the seed mix to be used. 8. A plan shall be prepared showing the placement of wetland buffer monuments. 9. All buffer monuments shall be installed prior to the sale of any lots. 10. All stormwater practices shall be place into a drainage and utility easement if not included in an outlot. 11. All drainage swales shall be included in drainage and utility easements and the development shall make any future builder and homeowner aware that these may not be altered without submittal of a revised grading plan to the city and subsequent approval of that revised plan. 12. The development contract shall include language indicating that the Homeowners' Association shall be responsible for any landscaping work associated with the biofiltration feature and the city shall maintain the associated infrastructure including the underdrain, the filtration media and the piped storm sewer conveyance system. 13. The south biofiltration feature shall have a skimmer emergency overflow structure designed and installed. 14. A detailed plan of the filtration basins, consistent with the MN Stormwater Manual shall be submitted with the final plat submittal for review and approval by city staff. It shall include, at a minimum, a plan view, a profile view, all necessary elevations, any in situ soil preparation, methodologies to be employed to protect from construction traffic, soil filter media specifications, any plantings and any appurtenant work to be done. 15. Underdrains and drain tile shall have tracer wire and cleanouts. 16. Pretreatment shall be required for all filtration basins receiving piped discharge. Planning Commission 1600 & 1630 Lake Lucy Road May 17, 2016 Page 24 of 24 17. A forebay, surge basin or other approved energy dissipation device shall be provided for the inlet into the biofiltration feature included in the outlot. The selected practice must not create undue maintenance burdens. The end result shall be non -erosive velocities into the basin. 18. Efforts shall be made to raise the elevations of Lots 2 through 5 to assure positive flow towards the street and ultimately to the treatment devices. 19. The applicant, their consultant and city staff shall collaborate to minimize drainage concerns in the back and side yards of lots 6 through 10. 20. Storm Water Utility Connection charges due at the final plat are estimated to be $58,880.00. ATTACHMENTS 1. Findings of Fact and Decision. 2. Development Review Application. 3. Reduced Copy ALTA/ACSM Land Title Survey 4. Reduced Copy Removals Plan 5. Reduced Copy Tree Removals Plan 6. Reduced Copy Preliminary Plat 7. Reduced Copy Temporary Erosion and Sediment Control Plan 8. Reduced Copy Grading Plan 9. Reduced Copy Sanitary Sewer and Watermain Plan 10. Reduced Copy Storm Sewer Plan 11. Reduced Copy Planting Plan 12. Lake Lucy Road & Yosemite Avenue Housing Development Queueing Study 2/25/16 13. Email from Roger and Charlotte Frerichs to Council Members dated April 21, 2016 14. Email from Kathryn Randall to Bob Generous dated April 25, 2016 15. Email from Mary Hebnderson to City Council dated May 3, 2016 16. Public Hearing Notice and Mailing List gAplan\2016 planning cases12016-09 lake lucy rd\swff report lake lucy rd sub.doc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION Application of Yosemite Holding, LLC, Almond & Carolyn Krueger and Craig & Deanna Claybaugh for rezoning, subdivision approval with variances from the subdivision requirements. On May 17, 2016, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Yosemite Holding, LLC, Almond & Carolyn Krueger and Craig & Deanna Claybaugh for rezoning of the property to Single -Family Residential District, preliminary plat approval of property in to 12 lots and two outlots with variances for the use of flag lots, cul-de-sac bubble size and a local street centerline offset of less than 300 feet and a building setback variance from the cul-de-sac bubble for lot 11. The Planning Commission conducted a public hearing on the proposed subdivision preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1. The property is currently zoned Rural Residential District, RR. 2. The property is guided in the Land Use Plan for Residential Low Density uses. 3. The legal description of the property is: See Exhibit A_ 4. The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse effects of the proposed amendment. The six (6) affects and our findings regarding them are: a. The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. b. The proposed use is or will be compatible with the present and future land uses of the area. c. The proposed use conforms with all performance standards contained in the Zoning Ordinance. d. The proposed use will not tend to or actually depreciate the area in which it is proposed. e. The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. f. Traffic generation by the proposed use is within capabilities of streets serving the property. 5. The Subdivision Ordinance directs the Planning Commission to consider seven possible adverse effects of the proposed subdivision. The seven (7) affects and our findings regarding them are: a. The proposed subdivision is consistent with the zoning ordinance and complies with all the district regulations and requirements; b. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan by creating single-family lots within the density ranges required by the comprehensive plan; c. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; d. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; e. The proposed subdivision will not cause environmental damage; f. The proposed subdivision will not conflict with easements of record; and g. The proposed subdivision is not premature. A subdivision is premature if any of the following exists: 1). Lack of adequate storm water drainage. 2). Lack of adequate roads. 3). Lack of adequate sanitary sewer systems. 4). Lack of adequate off -site public improvements or support systems. 6. The city council may grant a variance from the regulations contained in the subdivision ordinance as part of the plat approval process following a finding that all of the following conditions exist: a. The hardship is not a mere inconvenience, but allows for the logical configuration of the lots and also avoids negative impacts to the wetland; b. The hardship is caused by the particular physical surroundings, shape or topographical conditions of the land, due to the existing parcel configuration, wetlands and site topography; c. The condition or conditions upon which the request is based are unique and not generally applicable to other property since the city directed that the street access be from Yosemite; d. The granting of a variance will not be substantially detrimental to the public welfare and is in accord with the purpose and intent of the subdivision ordinance, the zoning ordinance and comprehensive plan. Variance Findings — Section 20-58 of the City Code provides the following criteria for the granting of a variance: a. Variances shall only be permitted when they are in harmony with the general purposes and intent of this Chapter and when the variances are consistent with the comprehensive plan. Finding: The construction of a single-family home on the site is permitted in the Single - Family Residential District. The need to provide relief from the setback at the bubble is due to the offset of the cul-de-sac and the storm water management which is being accommodated on the east side of the development adjacent to the wetlands. b. When there are practical difficulties in complying with the zoning ordinance. "Practical difficulties," as used in connection with the granting of a variance, means that the property owner proposes to use the property in a reasonable manner not permitted by this Chapter. Practical difficulties include, but are not limited to, inadequate access to direct sunlight for solar energy systems. Finding: The buildable area of the lot is significantly limited by the required setback from the cul-de-sac bubble which is offset into the lot. The property owner proposes to construct a single-family home and driveway. The buildable area on the property has created a practical difficulty for using the site in a reasonable manner, which requires limited relief from city code. c. That the purpose of the variation is not based upon economic considerations alone. Finding: The purpose of the variance is not based on economic considerations alone. The applicant would like to construct a single-family home and driveway on the in a residential zoning district. d. The plight of the landowner is due to circumstances unique to the property not created by the landowner. Finding: The location of the wetlands and storm water pond and the offset of the cul-de- sac bubble creates a unique circumstance for the property to work around when attempting to construct a single-family home on the lot. The required setback from the cul-de-sac bubble creates a narrowing of the buildable area on the lot. e. The variance, if granted, will not alter the essential character of the locality. Finding: The home located on this property will comply with all other setback requirements. Granting the proposed variance request will not alter the essential character of the locality of the Lake Lucy Road neighborhood. f. Variances shall be granted for earth sheltered construction as defined in Minnesota Statutes Section 216C.06, subdivision 14, when in harmony with this Chapter. Finding: This criteria does not apply. 8. The planning report #2016-09 dated May 17, 2016, prepared by Robert Generous, et al, is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve the Rezoning, Preliminary Plat with Variances for the use of flag lots and less than 300 feet street offset subject to the conditions of the staff report. ADOPTED by the Chanhassen Planning Commission this 17d, day of May 2016. CHANHASSEN PLANNING COMMISSION Fro Its Chairman 4 EXHIBIT A PARCEL A That part of the Northwest Quarter of Section 2, Township 116, Range 23, Carver County, Minnesota described as follows: Beginning at the Southwest corner of the Northwest Quarter, Section 2, Township 116, Range 23; thence East along the half section line 330 feet (20 rods); thence North 660.00 feet (40 rods); thence West 330 feet (20 rods) to the section line; thence South 660 feet (40 rods) to the place of beginning; EXCEPT so much of the following described tract as in the foregoing description, beginning at a point on the section line between said Section 2 and 3; Township 116, Range 23, said point being 610 feet North of the Quarter section corner between said Section 2 and 3 and marked by an iron gas pipe set in the ground; thence North along the section 591.5 feet to a cartway 16.5 (1 rod) wide; thence East along the South boundary of said cartway 280.5 feet to the center of a street 33 feet (2 rods) wide; thence South 4 degrees 47 minutes East along the center of said street 593.56 feet; thence West 330 feet to the place of beginning, according to the United States Government Survey thereof. PARCEL B That part of the Southeast Quarter of the Northeast Quarter (SE1/4NE1/4) of Section 3, Township 116, Range 23, described as follows: Starting at the Southeast Corner of said NE 1/4 of said Section 3, running Westerly along the South line of said SE 1/4 of said NE 1/4 a distance of 80 feet, then Northerly 275 feet, then Easterly 80 feet, thence Southerly along the Easterly line of said SE 1/4 of said NE 1/4 to the point of beginning, Carver County, Minnesota. PARCEL C That part of the Southeast Quarter of the Northeast Quarter of Section 3, Township 116, Range 23, as follows: Beginning at a point on the South line of said Southeast Quarter of the Northeast Quarter, 80 feet West of said Southeast corner; thence continuing along said line 170 feet; thence North 275 feet; thence West 80 feet; thence North 170.5 feet; thence North 8 1/2 degrees, East 13 rods and 3 links; thence East 18 rods, thence South 385 feet; thence West 80 feet; thence South 275 feet to the point of beginning, Carver County, Minnesota. COMMUNITY DEVELOPMENT DEPARTMENT CITY OF CgANgASSFN Planning Division — 7700 Market Boulevard Mailing Address — P.O. Box 147, Chanhassen, MN 55317 Phone: (952) 227-1300 / Fax: (952) 227-1110 APPLICATION FOR DEVELOPMENT REVIEW Submittal Date: I I PC Date: AM, CC Date: 60-Day Review Date: (Refer to the appropriate Application Checklist for required submittal information that must accompany this application) ❑ Comprehensive Plan Amendment ......................... $600 ❑ Minor MUSA line for failing on -site sewers ..... $100 ❑ Conditional Use Permit (CUP) ❑ Single -Family Residence ................................ $325 ❑ All Others......................................................... $425 ❑ Interim Use Permit (IUP) ❑ In conjunction with Single -Family Residence.. $325 ❑ All Others......................................................... $425 ❑� Rezoning (REZ) ❑ Planned Unit Development (PUD) .................. $750 ❑ Minor Amendment to existing PUD................. $100 Q All Others......................................................... $500 ❑v Sign Plan Review ........... N./A............................. $150 ❑ Site Plan Review (SPR) ❑ Administrative.................................................. $100 ❑ Commercial/Industrial Districts`......................$500 Plus $10 per 1,000 square feet of building area: ( thousand square feet) 'Include number of existing employees: 'Include number of new employees: ❑ Residential Districts ......................................... $500 Plus $5 per dwelling unit ( units) ❑� Subdivision (SUB) ❑ Create 3 lots or less ........................................ $300 Create over 3 lots ...... ................. $600 + $15 per lot ( 12 lots) ❑ Metes & Bounds (2 lots)..................................$300 ❑ Consolidate Lots..............................................$150 ❑ Lot Line Adjustment.........................................$150 ❑ Final Plat .............................. ............................ $700 (Includes $450 escrow for attorney costs)' *Additional escrow may be required for other applications through the development contract. ❑ Vacation of Easements/Right-of-way (VAC)........ $300 (Additional recording fees may apply) ❑v Variance (VAR) .................................................... $200 ❑ Wetland Alteration Permit (WAP) ❑ Single -Family Residence ............................... $150 ❑ All Others ....................................................... $275 ❑ Zoning Appeal ...................................................... $100 ❑ Zoning Ordinance Amendment (ZOA)................. $500 NOTE: When multiple applications are processed concurrently, the appropriate fee shall be charged for each application. Notification Sign (City to install and remove)...................................................................................................................... $200 {j OB Q Property Owners' List within 500' (City to generate after pre -application meeting) ............................. t..!.1. �....... $3 per address (41 addresses) ❑ Escrow for Recording Documents (check all that apply)....................................................................... $50 per document ❑ Conditional Use Permit ❑ Interim Use Permit ❑ Site Plan Agreement ❑ Vacation ❑ Variance ❑ Wetland Alteration Permit ❑ Metes & Bounds Subdivision (3 docs.) ❑ Easements( easements) TOTAL FEE: $1821.00 Section 2: Required Information Description of Proposal: Yosemite Holdings LLC respectfully requests approval for a rezoning, subdivision approval and three variances for flag lots to authorize the development of a 12 lot subdivision. Property Address or Location: 250033700,250033W0.8 5W241 Parcel #: Legal Description: Total Acreage: 8.96 Wetlands Present? Present Zoning: Rural Residential District (RR) Present Land Use Designation: Residential Low Density Existing Use of Property: 2 Single Family Homes 0 Check box is separate narrative is attached. 1600 and 1630 Lake Lucy Road See Sheet V3.01 ALTA SURVEY ® Yes ❑ No Requested Zoning: Single -Family Residential District (RSF) Requested Land Use Designation: Residential Low Density PropertySection 3: .. APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to the right to object at the hearings on the application or during the appeal period. If this application has not been signed by the property owner, I have attached separate documentation of full legal capacity to file the application. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Yosemite Holdings LLC Contact: Terry Forbord Address: 4960 Sussex Place Phone: (952) 470-5121 City/State/Zip: Shorewood, Minnesota 55331-9217 Cell: (612) 868-2483 Email: Terry Forbord <tforbord@forbordusa.com> Fax: Signature: Date: 4/1 /16 PROPERTY OWNER: In signing this application, I, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Contact: Address: Phone: City/State/Zip: Cell: Email: Fax: Signature: Date: This application must be completed in full and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and applicable procedural requirements and fees. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. PROJECT ENGINEER (if applicable) Name: Stantec Contact: Roger L Humphrey PE Address: 2335 Highway 36 N. Frontage Road Phone: (651) 967-4652 City/State0p: St Paul, MN 55113 Cell: (651) 706-3855 Email: Roger. Humphrey@Stantec.com Fax (651)636-1311 Section 4: Notification Information Who should receive copies of staff reports? 'Other Contact Information: ❑ Property Owner Via: ❑ Email ❑ Mailed Paper Copy Name: ❑� Applicant Via: ❑� Email ❑ Mailed Paper Copy Address: FZI Engineer Via: 2] Email ❑ Mailed Paper Copy City/State/Zip: ❑ Other* Via: ❑ Email ❑ Mailed Paper Copy Email: INSTRUCTIONS TO APPLICANT: Complete all necessary form fields, then select SAVE FORM to save a copy to your device. PRINT FORM and deliver to city along with required documents and payment. SUBMIT FORM to send a digital copy to the city for processing (required). SAVE FORM PRINT FORM SUBMm FORM ADDENDUM LAKE LUCY RD. APPLICATION FOR DEVELOPMENT REVIEW COMMUNITY DEVELOPMENT DEPARTMENT Planning Division — 7700 Market Boulevard Mailing Address — P.O. Box 147. Chanhassen. MN 55317 Phone: (952) 227-1300 / Fax: (952) 227-1110 CITY OF CHANNASSEN APPLICATION FOR DEVELOPMENT REVIEW PROPERTY OWNERS: In signing this application, I, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Almond Krueger krueger.al(agmail.com 612-363-2876 Carolyn Krueger kruegercc(o)gmail.com 612-865-2570 1600 Lake Lucy Rd Excelsior, MN 55331 Date: April 2, 2016 Almond Krueger Date: April 2.2016 Carl Krueger Craig Claybaugh cmclayl(dimchsi.com 952-250-1033 Deanna Claybaugh 1630 Lake Lucy Rd Excelsior, MN 56331-9023 Date: April 2, 2016 Craig Claybaugh L �i�Z :: � r/ Date: April 2. 2016 `� Deanna Claybaugh ALTA/ACSM LAND TITLE SURVEY I ! t i j 1 LT FILE NO. 531257 1 �' VICINITY MAP LAND DESCRIPTION ,rJ IJvi.fa. �� .. 1 �� ,'• . _ .,y" , fal IT ji �� t*L'' ``{,'' ! •• ITEMS CORRESPONDING �•��^ '°� 6 S' IY ' _.a1�_•t TO SCHEDULE B PARQIC � ::P. :°. L11 o I a...... .........��.... SURVEY NOTES ' 1'w ♦ kIi•' • /: i ♦u�� i it LEGEND ... .snewr fir„° I ell \ I / . ��j� •y �i i i� __ II 4 '\h_ l^edYl. —� -- ' , .I 11 I ``}` I II I• i i' i � i I I'1\li ' I 1. I I 1 {W \raR III 1, 4 1; � "•I � � /� � / ` J`♦: A. ♦ • `jam \ � I � / -- --i 1\I� . G \'�•` �': e�s"'`i` \`,\' i it I / ! • jl i i ' Iw��a�lmMli „``411 �'1 `" '"--i"' I P ii I � iF,:'`-\ ' ,'!•1`i •\`I\'\� �t•�`�. FIT; Qi A\ 1 ills \'"1 III V .o ` -1 OFF. A 3[ IF -FAIIIII—I'LAILAILIALLIFF",_... ®�i1 eoeurvxrtu.nvweAT, ow...u<wnveuemm c1I i.rn AIFTcor io•«•^.1.1F.wa�E' // 'rn, .c,. I"'. Cd �! AIPUDY' .ram 111'.11 I.... i, IDLAT-.w«+..�MLAt _ z^z ^,.,,....«..,, «r . «.,= ...,«.«.e.o.,..�..wTIAD—>..rt «,... it m"•p0°'ocro...vo...o 01 OFILL «>nw.^rn..L.. DILD I.— 1F"DFjFT FFFTT1 FIT IDIFF CAD OF U i w�DIAAcmae.c� �..cno.....�e.rt...w.. ♦_, LEGEND 7 z = --- --- — I. II1� N - A, AIDE DADD, DID, r •'� i • • { •�� \` JAI % i 4eiervm fmlN omq�e • / ,i i j ♦ gx.ew \ ```--------- \•� I 1h t• t 1 / w � ------W___ _ n • A. y lw .y � __ I �`�,t •���i r" :` � :.°PMxf• �cw... mi.•�Nr. �..ao-+�+.`�` NN) '•'� rurms ',�/I Na.•Ylgy��IwNV� ,.,�. ni. '.*. ,o{ �.ry � � • � � (NM � �� �� i i aw.ri.ow..nan<.ro.,.e.cm..,......nr�a� poi VOSNg6 � � wwnc uNrrs pJn/�nee evanmx�e�/m �/� �'�' ,.��•"' Y � r i� 1 i >I __ '' _ mEeGxawroaewrt i 1>A! P • / • � l: C... IN1REFGMR'NO1 M1110E• ,Uj `� (GLp1UiIIX1 J qm ` • We1 nlarou.wx O I 51Mmm ,NFF�•Na c & T �M i yy IONXMYi el1MCl0 maeosco zaxnw wR,� VMCIL IS'R9P AXTL (MIRY RE5101Ni1.LL Xfi AW r(L R. f „rxl�uNLmoeem-,R,rsr /^- I 9 I MN4M0l WAY YIIpM�a / 1 vARWIQ aS,RRMIms:Im0. /�/� � Lm♦f,arr / 0 I� s PII Iy t tgeeeY I m'Rf.v,vlvnvf NNtt•Z VH1B, . NII9masT,uR` Graz � - 10 nmfa — yYIYNCe "OU1.1,I 1R fool NIX WTM[A •� LOTfRCNIM£ IDIfROXIAC# NM. WI WNIX IN WmiX FlIG'[Q!' MI IDINNaEV 1@I aA. NtW09FG AT F1'S0 flIOASfDAT fY9 NT pGII[t•® X IGTS y/ w 1W !Itl ]Sp104 wre n 59.er Im lOUY ,s000 sE u7rR rtl n.ar ,m ,m.•r Ispoos IOI IYMA M&&PAD em •.RRmu..N..XM.uN...wl.tl,N. wuxtZ NSFNNlr e \ � !i 11.1e{Y , t oweMoe �lRRrrT lYeNRNTe w.NaWr.eu � _�J P •0R _ __� � rmxwRlNcexu. e MYIL MCW WT11 d wa C i ^ \ wim Tuveommnw eLeo Mnimleu ! u u�wsWXa aauw J I v eenaiR r�wn`" �eueerlo Ia ss+Ra� rffr aanuun :�': I ' I4 MResRIw Mw .e.... Eros Rw�oRNEry 390,%35F au cwef Rvna .a WR.G.W. 38,6875E GP ,ease OF " NI -�_— lY1[CJLL oerA,L ~p" x..,....a orXeueemaslr I Z . R.re kmw. 91.6795E I I l l u.eee aF I 1 I NL1Nll R.gl1! q �. 'Ala I f ^R. WRRYI•wR.an Wnwos 37,998 sE 17,I I er / rq vmuxo euRu 9095E !Rl? — —— —J r�..�eewLen _ 1 ,��••••• c.�n..vE� �� "' x:-iO1ue•.arrm.aaos wx .................. ..—. ............ a 41LWANS ----- RaNyW _ xR oeNvlr �3�3 u 4J C m II II r ........... J eMIN, %'A � r � vjrrr�frrr _-i, I L - ' :./ Id, RIIII e�vcwamem n7 ram rx m®vneww v rae roruors2.smur w m LOT 1 .,'{� EROSION CONTROL LEGEND e —sues ovmmrreia ®evnanx m*amw n0000s mvise wsv ® sursmimcw � an„o�-swot ^� wiawtasa wLVIXf/011EIPoIRRJI er9xw 6e� Qmsvrar�we.+wa �-EI oswmsxsurixwwx • m� a maw u 41 r- m I f 1 1 I l I 1 I 1. 1 I111111 I I 1 ` I I1 \ wwwm.vw®nw it /\\1j11 r I �n I r l i wYS.eds ON �mwaa...m TOW, � GF�StOOF 1-5 =mm wAv ��Y""s�YrYSw�m..�wAa w..s�. Ywwma.mmw�m �(XUINRGE w l - 11 ' 1 I ..mn.n.w�x ^rtme.rtmmmnma Y��mwn��.i»rsnrnwemmn I I II I \ 1 II 1 �•�� �wiaa�w®�psm u� 1 1 s.n�rrnsm.i»�v..u�rrwmm�s tt mn»elYw.�YmYsaY.rmo�i..rt ' MO 1 i u 4j N EiMEroX1ER111G 1O/.Fv u6lIH6lYE I __ , 4J - 6NIM�SXRtL W➢1lI➢II NIgN.M pS F-o'CdROXIY N 1 I \ - 1 I 1 1 - �—I1—I _j ry ' 1 6 �mE e2rtlNnr9mcumxuCr erlwetry wlnwdH tP I ' I I i'/ / _ _ { � y�L `/ I SNvrt� E•WL�E oI[rlWiE lvw m[wml M ®��Y I I � , / ' ele � I % I \ •j ICIe I \ � \` 1 \`I`\I' NdV2ol.E>K Alxrs/.i uw51WRFId B]IX SIo¢6acStW ytl R E I % / / -- s ' '\ -- - _`_I I'- I 111 TAWT�RONX6KR'fIM EUm ROAM MINIM.M OF IB�'xm /I � � % I IbR - -___ /\\ �'I I pHA/X¢MRTNGPEWIPBMl56xM1ISL10g1/.x5E iL11 { 1 % 1 I{111 I ` 1 1\ --/ I/' Il l,;ll /l ' e, 1p5pE ExI5nx�4vIWWlE55XxLL BE VA®Kx�}RYroE iNmNlnnGV L[6pI [jpjpl� ', \_/ /I / Egixd All 5lxwpNRxm NS./ y / �MDP/xllvOx ' / / /I / .a wduswxmwR.dnroswwul.¢sdslmm�a. EL Nmlvss vm+naswu EvwFlmmnuu RroRm� &e x VKYE � i i : verxunw Gun rr:/urlEx k / I Y` \ \ / I � I I i LL wsmronnEEvmRXwxxm ow.wuws mR new Mlw Fe f � r �. � ^ IL � ; ; ' i : ' ��' '1 `\ ,\ � ,,, pKro �/,"' �.�;m «m`•'wl"p�' ��Car 1 _ ' l ``�1 OT 1 11 .� I '; MLLWR'�WC1R ` •RI \� \ 11 I59�IGLLY Vlllldlmnwi TEILGTIM°.9�E� 1 RDI�IPIPS! ♦ \ `\ _� \• - 1011.T _I I _� _-�� - \ /=' -e li ' � _--� - F / MQ'W PfVxnM fl fL.tiIIXG IR61n6K90MIPln6F R/166Y.4p OX PEMMM 6TE V.WWSNYIIx Q>•NIE�( 1 1 I 1 I 1I � E1 1 1 1 w�a 1.5Exx�'yL i I muwni 1 d loslo"a �wIWIIIvxu E 6pLR4x•pm NIPXM y \ ewarone lwww �I MI.UII..M PN I�_IW3.16 _ an'r PRc ti IlL NE25LRY X8ECMLV- ItN @Ti1 REWpl®E �\ �AOR M{l1YSJMR Wxx.\xl¢SwltSrta(PMm 11.W nupn4 Flw5 .j upM'.£9 Nr{LpIIIG WStifSlW LL 01nRMlG•51W1¢<gpdnrz WrtH RLL Mary 611o.{X16 R1 J Y n. LL pyiyGiNVINEQIIgpB115xxpsrtaflGnWS. weeEro asmGLPGIZ EnR s�15 {�omxeE� o .wl. 6MPKIOl SXLLLERE4[.XEI&[I x[L n Iq pppppfi pl/EK! WmE➢iO..LLL Mlln¢, 51CRX p41Wi. NUNd[ Z �41vxiK5lpN{SLIO.FS.¢Cx�REgHRro. 9WLEd/2C1LLV�wmIU 2 WmAn16 Q 3 vc Gimrrs Kovuu ErsrnomnsIX �2 U Q PROPOS® UI LING 4 _T_R_E_ �Nary S,aN��.dmN —I-1—I-1— x o EM6 _ PROPOSED UfILI1V SITDMS `" • wwxuna xnur - • xwwGE '"_ �" • vnrunwsmd{msNna • mm�swa �uml xvl _� • SroRX�A9lGro1 V9X i i' ' H S1CnN ENH{11MEDdpSRfld 1t1 I • SRRNEWEPMTEi Srvll[INE OF I { • 6iMNEW6lM9NPV5RYCIWE • [ORIX RFDUN]rt .`r_ ♦ my NmKNr wNnRxmum{ = NUE .o.o Im o e E Er ow.lolRm RN (xfl-blow uw aT�ralrr a-v Rvs `� III I II/I 11 1 SIgwW m DID Sf M. Ww s Wu qxM------------------�, TMIO .YNmI�R>• �Is iMY V'- MId10 I IlI I 11 r SAORMN/ITBI r r. LL u. u u U 4T C Nm ✓-JS -IS 0.0 •OS% -`1 VMARolnwrsrtntxrS SNv/x oxMwr¢ n. I1ux/ccw,w lxsoFc�oxs uulw aamlunwsx pMmn 2 I i \1 mmuarW vnln. slwlo: mn..xxsswi. x nwWxm nm.ro.xxouluo mnolxcrosmW un nE mu/ -;MXI NM.1011.00 ; 1/1 pII.6nGI of Yxna. LLt9NAK1o19u1+mollomnn wlm.0 Mury wlnlxrtswx a I YIV (1!)•IOO1.N I RRwMmx.R}mexwrs.xo� aruwnwc n. wmmrnlw nursmxs omxce.ecmrt.ILrLw �IM/(fl.lOW.M LL mNAK101LWL![xade'lu[krtuu x¢ovnM. 'j y,�1 ' vOLOIrpRn xm mnreow. ui n¢.sovllowxq mM. nMgC 91OW5 •tR4 a Q VN (V/i•1408.]I) q.5x ^Wlnfo. I s5 U __ pglQx11a6�MO�9Y. R1RPpFUMAVI. PROPOSED UTILf1Y LIx6 Q_ &W= .0!, 1u y RRI (fl•10RPA �>�>�>�>— Gxnnxr5t¢tq U 'edr-Ir 0.Q s1GMRMllGMY1R[ 3 �IAn1 —'—'—'—'— vMi•aRl 1rMM•1010.N `sm(S),IW.w -- - PROPOSED UTIUTV SYMBOLS � -Ir Ro --- - . MNfMRCylort O&M ter= yy}} �QI11I Mgf.MM/IGMIAf9llRN RYY DD•30060D -__ -�- • fmaAerlw ellReurol Mml �I,-I � IIMy�y'a, I II til i' .- nGXax'LLA..®o•$.�11 �11M 1 I I I �-+��?c�f�� M flfPX 4NERCMEl9RlCM1IR � smw sxv a/mrlw�srwrnu • RRRVI mRav+nn �M n •�• Y— i MCMYdtW! Y/19.m® 1 I R ` , 1 -,; � . �-i .- ' -- 1 � ; i' , •� � 1,1 , .wmn Reo .n�enewwim ,'� % / � ,% � ♦, !e9 �- �� �' _ __ -----I � .m..m..,m ®gyp � / .` � ;�� s'" ` 1 / I ! I , 1 .^�• O mne FeyyygF 1 ,` I IV T `:1 `.. mm 1`I ul IN / `, 1 1 `11 ••_ li ,i� ., I ` O i r �ii ii ' ,' u'� UI __•.., I 1 . �. r ! � - I; 1 I:I ; ' wMs� ins = I p 1 1., 1,\`\` r bisn.w w 1 1 � IUI I _ _ — ---- ram- � ®e.m eu.m•e xv.+u.mu zz- -= -- -- ® Stantec Memo To: Stephanie Smith, PE From: Pat McGraw, PE City of Chanhassen Stantec Consulting Services Inc. File: 193803412 Date: February 25, 2016 Reference: Lake Lucy Road & Yosemite Avenue Housing Development Queueing Study INTRODUCTION A development consisting of 12 single family homes has been proposed to be built in the city of Chanhassen, MN near the intersection of Lake Lucy Road and Yosemite Avenue. Access to the new development will be off of Yosemite Avenue. Due to the proximity of the entrance for the new development to the intersection at Lake Lucy Road and Yosemite Avenue, there is concern that vehicles may queue back to the intersection. Stantec has been asked to investigate the potential for queueing of vehicles attempting to enter the new development on Yosemite Avenue. METHODOLOGY COUNTS Stantec performed turning movement counts (TMC) at the intersection of Lake Lucy Road and Yosemite Avenue on the afternoon of Wednesday, February 25, 2016 from 4:00-6:00 PM. It was determined that only PM peak counts would be required, as that is the time when the most vehicles would attempt to turn into the development. The counts taken were seasonally adjusted according to MnDOT standards. TRIP GENERATION Trip generation was performed using the ITE Trip Generation Manual 9th Edition. The results can be seen in Table 1 below. To simulate the maximum amount of strain on the system, and create the most potential for queues to develop, all vehicles entering the development were set to originate from Lake Lucy Road. Design with cormKmity in mind mp c.\users\mtp ..\de J.P\c ho \qu .hg tech memo.tl ® Stantec February 25, 2016 Stephanie Smith, PE Page 2 of 2 Reference: Lake Lucy Road 3 Yosemite Avenue Housing Development Queueing Study FORECASTING Analysis was performed for the year 2036. The MnDOT traffic projection factor for Carver County is currently 1.4. This factor was applied uniformly to all turning movement counts. SIMULATION The 2036 analysis was performed using the software Synchro/SimTraffic 9. The results of the simulation from this software provide the projected queueing data required to determine if any problems could potentially arise by the year 2036. RESULTS The results of the simulation showed no problems with queueing at the new intersection. The maximum queue observed in simulation was 18' in length or roughly two cars. The 95th percentile queue was 9' or roughly one car. The simulation shows that there should not be a sufficient amount of traffic to create queues reaching back to the Lake Lucy Road and Yosemite Avenue intersection. STANTEC CONSULTING SERVICES INC. �a7 1-'7 7%' 11'rza — Pat McGraw Senior Project Manager Phone: (651 ) 967-4655 Fax: (651 ) 636-1311 Pat.McGraw@stantec.com C.C. Roger Humphrey, PE Design with community in mind mp c:\users\Mtp wen\deWop\chanh n\queueing tech m ..d. From: Charlotte Frerichs <&erixc@hotmail.com> Date: April 21, 2016 at 6:16:29 PM CDT To: "councilCa.ci.chanhassen.mn.us" <councilna,ci.chanhassen.mn.us> Subject: Forbord development Dear Council Members, We are interested in the proposed development of Forbord Land Company LLC on Lake Lucy Road and Yosemite in our neighborhood. We attended the meeting when Terry Forbord explained the project. Our concern is the loss of many beautiful trees. The ash borer is already in Plymouth and will soon become a tragic problem in our city. On this particular property, it is a haven for deer, wild turkeys and other wild life. We hope that the developers will be encouraged to save as many trees as possible. There is a beautiful clump of aspen -like trees on the comer that needs to be saved. If you have not driven by this property, please do and let the developer know that it is important not to destroy these very old and lovely trees. The David Weekley development at the end of our street was clear-cut and we do not want that to be repeated. The final approval of this project is Tuesday, May 3rd. With respectful regards, Roger and Charlotte Frerichs Generous, Bob From: Sent: To: Cc: Subject: Robert and...... jbrandall@aol.com Monday, April 25, 2016 6:05 PM Generous, Bob Hoffman, Todd 1600/1630 Lake Lucy Development I have great concern about the water runoff and retention ponds along Lake Lucy Road on the proposed development plan of Yosemite Holding LLC at 1600/1630 Lake Lucy Road. Where are these retention ponds to drain? There is no direct access to drain to Lake Lucy, currently the water along this section of road drains onto my property which does not have drainage access to Lake Lucy What are the elevations for at least the 5 houses proposed along LLR? That too will cause more runoff onto my property, and a larger breeding ground for mosquitos. I assume since there is not a variance for hard cover on any of the lots that is not an issue but..... can we request storm water safe or permeable paver driveways be installed to cut down on hard cover? Why weren't the neighbors contacted about the Gloccum subdivision before it happened. There was no contact from the city notifying when it was going to the Planning Commission or Council asking us for input, why? Sincerely, Kathryn Randall 1571 Lake Lucy Road 952-474-6522 Sent via iPhone On May 3, 2016, at 9:55 AM, Mary Henderson <mkhendersoni�mchsi.com> wrote: Dear Council, I have been a Chanhassen resident for 23 of the last 26 years and love where I live. Chanhassen has been voted one of the Best Cities to live in numerous times, one of the reasons for this award is it's `wide swaths of open space". However this is ever changing, changing the look and feel of why we Chanhassen's love living here. There has been a 13.68 % growth since 2000, I live in the Minnetonka School District and have seen Excelsior Elementary grow from 500 students in 2005 to over 800 in 2016. They had to downsize the playground to accommodate the cars coming and going onto the school property. There has been a huge expansion of development on West 78th Street, with Galpin continuing development of housing, and a new preschool. Wherever you look the "swaths" of open land are being developed. Small parcels where too many oversized homes are being added. For example The David Weekly Development on Yosemite and Lake Lucy. And now a new proposal to add 12 more homes across the street from there. This is the street I live off of, where Yosemite and Apple Road meet. I walk everyday along Yosemite, dodging cars that cut through to get to the city of Excelsior, HWY 7 and the schools in this area. Yosemite is used more often then Lake Lucy to Powers to access these locations. By adding 12 new homes, at least 24 more vehicles will be driving up and down a road that has no side walk and is very busy. More land will be developed, taking away green space and displacing the many animals we all enjoying seeing. All for what? The value of my 2006 new home construction has actually gone down the last couple of years. Which is very disappointing. I do not see how adding additional homes in this already overbuilt area will benefit the residents that live here. One more thing, with the passing of Prince, now his land might possibly be up for development as well. Bringing in more taxes for Chanhassen, but not good for the residents seeing their home values drop and taxes go up. This is not the reason why I live here, to see every open piece of land to be developed. Please consider this proposed land site not to be developed. Thank you, Mary Henderson 1435 Knob Hill Lane Excelsior, MN 55331 CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MIIQNESOTA) ) ss. COUNTY OF CARVER ) I, Kim T. Meuwissen, being first duly sworn, on oath deposes that she is and was on April 21, 2016, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for Rezoning from Rural Residential District (RR) to Single -Family Residential District (RSF), and preliminary plat with variances for a 12-lot subdivision on 8.96 acres of property — Planning Case 2016-09 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subscribed and sworn to before me this -;-L day of 21P6 .2016. Ut.� �L*otary Public Deputy JENNIFER ANN POTTER .�! Notary Public -Minnesota - "`"' My Corn mww Exykaa Jan 31. 2020 258930200 ALAN ROBERT WEINGART 1685 STELLER CT (EXCELSIOR, MN 55331-9080 250024000 ALMOND L & CAROLYN C KRUEGER 1600 LAKE LUCY RD EXCELSIOR, MN 55331-9023 257880020 ANDREW HEBERT 16566 SHADOW LN CHANHASSEN, MN 55317-9375 256070130 BARTT&ANNETTER ELLSON !1700 TEAL CIR EXCELSIOR, MN 55331-9097 256070070 BREE IORGENSON I1731 WOOD DUCK CIR EXCELSIOR, MN 55331-9096 258930160 BRIAN R & JENNIFER8 JO_ HNSON �6639 LAKEWAY DR CHANHASSEN, MN 55317-7578 258930020 BRYAN M SCHOEN 6630 LAKEWAY DR CHANHASSEN, MN 55317-7578 25=3700 CRAIG & DEANNA CLAYBAUGH 1630 LAKE LUCY RD EXCELSIOR, MN 55331-9023 MARY KATHRYN SISSEL 11710 TEAL CIR A_RBYE WINTERS L691 PINTAIL Cl ERSON 6451 YOSEMITE 4OLLYAJUDD 1731 WOOD DU FAMILY TRUST 4WILDERMUTH REV TRUST 1641 WOOD DUCK LN 6672 LAKEWAY DR 6470 YOSEMITE AVE N_1BERSCHEIT N KENYON RANDALL 1571 LAKE LUCY RD & MARY JO REINHARDT _ 6530 SHADOW LN ICE H & NANCY S MCDOWELL 6663 LAKEWAY DR WILLIAMS 257880010 MATTHEW D & STACY A HASTAD 1430 LAKE LUCY RD 257890040 MICHAEL C&SHARON FTODD _ 6540 SHADOW UN 256850010 MICHAEL RISHAVY 6440 YOSEMITE AVE _ 1671 PINTAIL CIR 256070200 MICHAEL T&LYSSA L CAMPBELL 1701 PINTAIL CIR 256070170 NEIL R& KATHLEEN CAULEY _ 1721 WOOD DUCK LN 256070150 NICHOLAS J WALSTROM 1700 LAKE LUCY RD 254070110 PATRICK J JOHNSON 1720 WOOD DUCK LN _ 256070090 PAUL ORVIS TWENGE 256070190 PHILIP C& MARGARET A MARSTON 1691 PINTAIL CIR 254070160 PHILIP R THIESSE 2675 STELLER CT _ LAKEWAY DR 258930010, RAMESH GURUSAMY 16612 1661 WOOD DUCK LN 256070210 � RICHARD S&JULIE A SAFFRIN _ 256070120 ROBERT A& LINDA M GUNDERSEN 1690 WOOD DUN CK I _ __ 250032700[ ROBERT I & SANDRA A KENDALL 1645 LAKE LUCY RD _ 258930030 ROGER L& CHARLOTTE I FRERICHS 6648 LAKEWAY DR 257860010 RYAN WILLIAM YANKOUPE 6481 YOSEMITE 257890020 SHAUN D NUGENT _ 65605HADOW LN 256070160SHERYL K LARSON 1711 WOOD DUCK LN 25696001011SUKO BUDIJONO 1721 WOOD DUCK CIR 256850050SUSAN JORGENSEN 6510 YOSEMITE _ 250022800 THOMAS ALAN STEWARD 6471 YOSEMITE THY I LINDQ_U_I_ST_ 1650 LAKE LUCY RD _ M PARRISH 1648D YOSEMITE AVE 6619 LAKEWAY DR 1111 N POST OAK RD :R & ALEXANDRA M MASUI LEY HOMES LLC MN 55331-9097 MN 55331-9098 MN 55331-9036 MN 55331-9076 11601 LAKE LUCY RD EXCELSIOR, MN 55331 1600 LAKE LUCY RD EXCELSIOR, MN 55331 6566 SHADOW LIN _ CHANHASSEN, MN 55317 1700 TEAL ClR EXCELSIOR, MN 55331 1731 WOOD DUCK CIR I EXCELSIOR, MN 55331 6639 LAKEWAY DR CHANHASSEN, MN 55317 _ _ 16630 LAKEWAY DR ICHANHASSEN, MN 55317 1630 LAKE LUCY RD EXCELSIOR, MN 55331 1710 TEAL CIR_ EXCELSIOR, MN 55331 1691 PINTAIL CIR EXCELSIOR, MN 55331 6451 YOSEMITE EXCELSIOR, MN 55331 _ 1731 WOOD DUCK W EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9036 6431 YOSEMITE EXCELSIOR, MN 55331 _ WAYZATA, MN 55391- 1460 LAKEWAY CT CHANHASSEN, MN 55317 EXCELSIOR, MN 55331-9094 1641 WOOD DUCK LN EXCELSIOR, MN 55331 _ CHANHASSEN, MN 55317 CHANHASSEN, MN 55317-7578 6672 LAKEWAY DR EXCELSIOR, MN 55331-9037 6470 YOSEMITE EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9022 1571 LAKE LUCY RD CHANHASSEN, MN 55317 CHANHASSEN, MN 55317-9375 6530 SHADOW LN CHANHASSEN, MN 55317-7578 6663 LAKEWAY DR CHANHASSEN, MN 55317 CHANHASSEN, MN 55317-9375 16550 SHADOW LN CHANHASSEN, MN 55317 EXCELSIOR, MN 55331-9024 11655 LAKE LUCY RD _ EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9037 _ 16460YOSEMITE EXCELSIOR, MN 55331 CHANHASSEN, MN 55317 CHANHASSEN, MN 55317-9382 1430 LAKE LUCY RD CHANHASSEN, MN SS317-9375 6540 SHADOW LN _CHANHASSEN, MN 55317 EXCELSIOR, MN 55331-9037 EXCELSIOR, MN 55331-9D98 6440YOSEMITE 1671 PINTAIL CIR EXCELSIOR, MN 55331 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-3100 _ I�1701 PINTAIL CIR EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9076 1721 WOOD DUCK LN EXCELSIOR, MN 55331 _ EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9025 1700 LAKE LUCY RD EXCELSIOR, MN 55331-9077 1720 WOOD DUCK LN EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9098 1681 PINTAILCIR EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9080 16755TELLER CT EXCELSIOR, MN 55331 CHANHASSEN, MN 55317-7578 16612 LAKEWAY DR CHANHASSEN, MN 55317 EXCELSIOR, MN 55331-9094 1661 WOOD DUCK LN EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9093 3690 WOOD DUCK LN _ EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9024 1645 LAKE LUCY RD _ EXCELSIOR, MN 55331 _ CHANHASSEN, MN 55317 EXCELSIOR, MN 55331 CHANHASSEN, MN 55317-7578 6648 LAKEWAY DR EXCELSIOR, MN 55331-9036 6481 YOSEMITE RD 6560 SHADOW LN CHANHASSEN, MN 55317.9375 CHANHASSEN, MN 55317 1711 WOOD DUCK LN EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9076 1722 WOOD DUCK CIR _ EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9096 EXCELSIOR, MN 55331-9038 6510 YOSEMITE 6473 YOSEMITE 165.0 LAKE LUCY RD EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9036 EXCELSIOR, MN 55331 EXCELSIOR, MN 55331-9023 EXCELSIOR, MN 55331 _ EXCELSIOR, MN 55331-9037 6480YOSEMITE 6619 LAKEWAV DR _ EXCELSIOR, MN 55331 CHANHASSEN, MN 55327 CHANHASSEN, MN 55317-7578 !HOUSTON, TX 77055-7310 6567YOSEMITEAVE CHANHASSEN,MN55317 Notice of Public Hearing Chanhassen Planning Commission Meeting Notice of Public Hearing Chanhassen Planning Commission Meeting Date & Time: Tuesday, May 3, 2016 at 7:00 P.M. This hearing may not start until later in the evening, depending on the order of the agenda. Location: City Hall Council Chambers, 7700 Market Blvd. Request for Rezoning from Rural Residential District (RR) to Proposal: Single -Family Residential District (RSF), and preliminary plat with variances for a 12-lot subdivision on 8.96 acres of property. Applicant: Yosemite Holdings LLC. Owner: Almond & Carolyn Krueger and Craig & Deanna Cla bau h. Property 1600 and 1630 Lake Lucy Road Location: A location map is on the reverse side of this notice. The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the What Happens public hearing through the following steps: at the Meeting: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. If you want to see the plans before the meeting, please visit the City's projects web page at: www.ci.chanhassen.mn.us/2016-09. If you wish to talk to someone about this project, please contact Robert Generous Questions & by email at bcenerous(d),ci.chanhassen.mn.us or by phone at Comments: 952-227-1131. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. The staff report for this item will be available online on the project web site listed above the Thursday prior to the Planning Commission meeting. NEWI Sign up to receive email and/or text notifications when meeting agendas, packets, minutes and videos are uploaded to the city's website. Go to www.ci.chanhassen.mn.us/notifyme to sign up! ply Review Procedure: • Subdivisions, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses, Wetland Alterations, Rezonings, Comprehensive Plan Amendments and Code Amendments require a public hearing before the Planning Commission. city ordinances require all property, within 500 feet of the subject site to be notified of the application in writing. Any Interested party Is invited to attend the meeting. • Staff prepares a report on the subject application that Includes all pertinent information and a recommendation, These reports are available by request. At the Planning Commission meeting, staff will give a verbal oversew of the report and a recommendation. The item will be opened for Me public to speak about the proposal as a par of the hearing process. The Commission will close Me public heating and discuss the Item and make a recommendation to the City Council. The City Council may reverse, affirm or modify wholly or partly the Planning Commission's recommendation. Rezoning, land use and code amendments take a simple majority vote of the ply Council except moorings and land use amendments from residential to commercialAndustrial. • Minnesota Slate Statute W9.99 requires all applications to be processed within 60 days unless the applicant waives this standard Some applications due to their complexity may take several months to complete. Any person wishing to follow an item through the process should check with the Planning Department regarding its status and scheduling for the City Council meeting. • A neighborhood spokesperson/representative is encouraged to provide a contact for the city. Often developers are encouraged to meet with the neighborhood regarding their proposal. Staff is also avallable to review the project with any interested person(s). • Because the Manning Commission holds the public hearing, the City Council does not. Mnutes are taken and any correspondence regarding the applicator, will be Included in the report to the City Council. ti you wish to have something to be included in the report, lease contact the Manning Staff person named on the notification. Date & Time: Tuesday, May 3, 2016 at 7:00 P.M. This hearing may not start until later in the evenin , depending on the order of the agenda. Location: City Hall Council Chambers, 7700 Market Blvd. Request for Rezoning from Rural Residential District (RR) to Proposal: Single -Family Residential District (RSF), and preliminary plat with variances for a 12-lot subdivision on 8.96 acres of property. Applicant: Yosemite Holdings LLC. Owner: Almond & Carolyn Krueger and Craig & Deanna Cla bau h. Property 1600 and 1630 Lake Lucy Road Location: A location map is on the reverse side of this notice. The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the What Happens public hearing through the following steps: at the Meeting: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. If you want to see the plans before the meeting, please visit the City's projects web page at: www.ci.chanhassen.mn.us/2016-09. If you wish to talk to someone about this project, please contact Robert Generous Questions & by email at bcenerous(&ci.chanhassen.mn.us or by phone at Comments: 952-227-1131. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. The staff report for this item will be available online on the project web site listed above the Thursday prior to the Planning Commission meeting. NEWI Sign up to receive email and/or text notifications when meeting agendas, packets, minutes and videos are uploaded to the city's website. Go to www.ci.chanhassen.mn.us/notifyme to sign up! City Review Procedure: • Subdivisions, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses, Wetland Alterations, Rezonings, Comprehensive Plan Amendments and Code Amendments require a public hearing before the Planning Commission. City ordinances require all property within 500 feet of the subject site to be notified of the application in writing. Any interested party is invited to attend the meeting. • Stan prepares a report on the subject application that includes all pertinent information and a recommendation. These reports are available by request. Al the Planning Commission meeting, staff will give a verbal ownhew of Me report and a recommendation. The Item will be opened for the public to speak about the proposal as a part of the heating process. The Commission will close the public hearing and discuss the Item and make a recommendation to the City Council. The City Coundl may reverse, affirm or modify wholly or partly the Planning Commission's recommendation. Rezonings, land use and code amendments take a simple majority vote of the City Council except rezonings and land use amendments from residential to commerciallindustdal. • Minnesota State Statute 519.99 requires all applications to be processed within 60 days unless the applicant waives this slandaM. Some applications due to their complexity may take several months to complete. Any person wishing to follow an Item through the Process should check with the Planning Department regarding Its status and scheduling for the City Council meeting. • A neighborhood spokesperson/representative is encouraged to provide a contact for the city. Often developers are encouraged to meet with the neighborhood regarding their proposal. Staff is also available to review Me project with any interested person(s). • Because the Planning Commission holds lire public hearing, the City Council does not. Minutes are taken and any comespondence regarding the application will be included in the report to the City Council. tt you wish to have something to be Included In the report, lease contact the Planning Staff person named on the notification. CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Kim T. Meuwissen, being first duly sworn, on oath deposes that she is and was on April 28, 2016, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Postponement of Public Hearing for Rezoning from Rural Residential District (RR) to Single -Family Residential District (RSF), and preliminary plat with variances for a 12-lot subdivision on 8.96 acres of property — Planning Case 2016-09 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subscribed and sworn to before me this �) day of MO� 1 2016. QW7 Notary Public www ENNIFER ANN POTTER jl"�k Notary Publiooinnesota CMssiw EV nJan 31,2020 CITY OF CHANHASSEN PLANNING COMMISSION NOTICE OF POSTPONED PUBLIC HEARING Dear Property Owner: On April 21, 2016, the City of Chanhassen mailed a public hearing notice to you regarding the following proposal: Request for Rezoning from Rural Residential District (RR) to Single -Family Residential District (RSF), and preliminary plat with variances for a 12-lot subdivision on 8.96 acres of property located at 1600 and 1630 Lake Lucy Road. Applicant: Yosemite Holdings LLC. Owner: Almond & Carolyn Krueger and Craig & Deanna Claybaugh. The public hearing has been POSTPONED until further notice. You will receive another postcard when the hearing has been rescheduled. If you have questions regarding this proposal, contact Robert Generous at 952-227-1131 or by email: bgenerousCa)ci.chanhassen.mn.us, or visit the project web page at www.ci.chanhassen.mn.us/2016-09 CITY OF CHANHASSEN PLANNING COMMISSION NOTICE OF POSTPONED PUBLIC HEARING Dear Property Owner: On April 21, 2016, the City of Chanhassen mailed a public hearing notice to you regarding the following proposal: Request for Rezoning from Rural Residential District (RR) to Single -Family Residential District (RSF), and preliminary plat with variances for a 12-lot subdivision on 8.96 acres of property located at 1600 and 1630 Lake Lucy Road. Applicant: Yosemite Holdings LLC. Owner: Almond & Carolyn Krueger and Craig & Deanna Claybaugh. The public hearing has been POSTPONED until further notice. You will receive another postcard when the hearing has been rescheduled. If you have questions regarding this proposal, contact Robert Generous at 952-227-1131 or by email: benerous(a-)ci.chanhassen.mn.us, or visit the project web page at www.ci.chanhassen.mn.us/2016-09 ALAN ROBERT WEINGART ALMOND L & CAROLYN C KRUEGER ANDREW HEBERT 1685 STELLER CT 1600 LAKE LUCY RD 6566 SHADOW LN EXCELSIOR, MN 55331-9080 EXCELSIOR, MN 55331-9023 CHANHASSEN, MN 55317-9375 BART T & ANNETTE R ELLSON 1700 TEAL CIR EXCELSIOR, MN 55331-9097 BRYAN M SCHOEN 6630 LAKEWAY DR CHANHASSEN, MN 55317-7578 DAVID J & DARBY E WINTERS 1691 PINTAIL CIR EXCELSIOR, MN 55331-9098 DONALD M & CAROL OELKE 6431 YOSEMITE EXCELSIOR, MN 55331-9036 GWEN M WILDERMUTH REV TRUST 6672 LAKEWAY DR CHANHASSEN, MN 55317-7578 KEITH A & MARY JO REINHARDT 6530 SHADOW LN CHANHASSEN, MN 55317-9375 MARK & TRACY WILLIAMS 1655 LAKE LUCY RD EXCELSIOR, MN 55331-9024 MICHAEL C & SHARON F TODD 6540 SHADOW LN CHANHASSEN, MN 55317-9375 BREEJORGENSON 1731 WOOD DUCK CIR EXCELSIOR, MN 55331-9096 CRAIG & DEANNA CLAYBAUGH 1630 LAKE LUCY RD EXCELSIOR, MN 55331-9023 DAVID L PETERSON 6451 YOSEMITE EXCELSIOR, MN 55331-9036 ESTATE DEVELOPMENT CORPORATION 1520 WAYZATA BLVD WAYZATA, MN 55391- KATHRYN J BERSCHEIT 6470 YOSEMITE AVE EXCELSIOR, MN 55331-9037 LAWRENCE H & NANCY S MCDOW ELL 6663 LAKEWAY DR CHANHASSEN, MN 55317-7578 MARK R RANDALL 6460 YOSEMITE EXCELSIOR, MN 55331-9037 MICHAEL RISHAVY 6440 YOSEMITE AVE EXCELSIOR, MN 55331-9037 BRIAN R & JENNIFER B JOHNSON 6639 LAKEWAY DR CHANHASSEN, MN 55317-7578 DANIEL D & MARY KATHRYN SISSEL 1710 TEAL CIR EXCELSIOR, MN 55331-9097 DAVID W & HOLLY A JUDD 1731 WOOD DUCK LN EXCELSIOR, MN 55331-9076 FLOREK FAMILY TRUST 1641 WOOD DUCK LN EXCELSIOR, MN 55331-9094 KATHRYN KENYON RANDALL 1571 LAKE LUCY RD EXCELSIOR, MN 55331-9022 MARC & RENEE SCHUBBE 6550 SHADOW LN CHANHASSEN, MN 55317-9375 MATTHEW D & STACY A HASTAD 1430 LAKE LUCY RD CHANHASSEN, MN 55317-9382 MICHAEL T & LYSSA L CAMPBELL 1671 PINTAIL CIR EXCELSIOR, MN 55331-9098 NEIL R & KATHLEEN CAULEY NICHOLAS J WALSTROM PATRICK J JOHNSON 1701 PINTAIL CIR 1721 WOOD DUCK LN 1700 LAKE LUCY RD EXCELSIOR, MN 55331-3100 EXCELSIOR, MN 55331-9076 EXCELSIOR, MN 55331-9025 PAUL ORVIS TWENGE PHILIP C & MARGARET A MARSTON PHILIP R THIESSE 1720 WOOD DUCK LN 1681 PINTAIL CIR 1675 STELLER CT EXCELSIOR, MN 55331-9077 EXCELSIOR, MN 55331-9098 EXCELSIOR, MN 55331-9080 RAMESH GURUSAMY 6612 LAKEWAY DR CHANHASSEN, MN 55317-7578 ROBERT J & SANDRA A KENDALL 1645 LAKE LUCY RD EXCELSIOR, MN 55331-9024 SHAUN D NUGENT 6560 SHADOW LN CHANHASSEN, MN 55317-9375 SUSANJORGENSEN 6510 YOSEMITE EXCELSIOR, MN 55331-9038 TROY M PARRISH 6480 YOSEMITE AVE EXCELSIOR, MN 55331-9037 WILLIAM P STROUT JR 1670 LAKE LUCY RD EXCELSIOR, MN 55331-9023 RICHARD S & JULIE A SAFFRIN 1661 WOOD DUCK LN EXCELSIOR, MN 55331-9094 ROGER L & CHARLOTTE J FRERICHS 6648 LAKEWAY DR CHANHASSEN. MN 55317-7578 SHERYL K LARSON 1711 WOOD DUCK LN EXCELSIOR, MN 55331-9076 THOMAS ALAN STEWARD 6471 YOSEMITE EXCELSIOR, MN 55331-9036 TUCKER & ALEXANDRA M MASUI 6619 LAKEWAY DR CHANHASSEN, MN 55317-7578 ROBERT A & LINDA M GUNDERSEN 1690 WOOD DUCK LN EXCELSIOR, MN 55331-9093 RYAN WILLIAM YANKOUPE 6481 YOSEMITE EXCELSIOR, MN 55331-9036 SUKO BUDIJONO 1721 WOOD DUCK CIR EXCELSIOR, MN 55331-9096 TIMOTHY J LINDQUIST 1650 LAKE LUCY RD EXCELSIOR, MN 55331-9023 WEEKLEY HOMES LLC 1111 N POST OAK RD HOUSTON, TX 77055-7310 CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Kim T. Meuwissen, being first duly sworn, on oath deposes that she is and was on May 6, 2016, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Rescheduled Public Hearing for Rezoning from Rural Residential District (RR) to Single -Family Residential District (RSF), and preliminary plat with variances for a 12-lot subdivision on 8.96 acres of property — Planning Case 2016-09 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Kim I Meuwissen, Depu Subscribed and sworn to before me this _5 day of M29 2016. otary Public AJENNIFER I POTTER �-/I Notary Public•Minnesota j My commission ErlMraa Jan 31, 2020 CITY OF CHANHASSEN PLANNING COMMISSION NOTICE OF RESCHEDULED PUBLIC HEARING Dear Property Owner: On April 21, 2016, the City of Chanhassen mailed a public hearing notice to you regarding the following proposal: • Request for Rezoning from Rural Residential District (RR) to Single -Family Residential District (RSF), and preliminary plat with variances for a 12-lot subdivision on 8.96 acres of property located at 1600 and 1630 Lake Lucy Road. Applicant: Yosemite Holdings LLC. Owner: Almond & Carolyn Krueger and Craig & Deanna Claybaugh. The public hearing has been RESCHEDULED for May 17, 2016 in the City Hall Council Chambers. The meeting will begin at 7:00 p.m. This hearing may not start until later in the evening, depending on the order of the agenda. If you have questions regarding this proposal, contact Robert Generous at 952-227-1131 or by email: baenerousaci.chanhassen.mn.us, or visit the project web page at www.ci.chanhassen.mn.us/2016-09 CITY OF CHANHASSEN PLANNING COMMISSION NOTICE OF RESCHEDULED PUBLIC HEARING Dear Property Owner: On April 21, 2016, the City of Chanhassen mailed a public hearing notice to you regarding the following proposal: • Request for Rezoning from Rural Residential District (RR) to Single -Family Residential District (RSF), and preliminary plat with variances for a 12-lot subdivision on 8.96 acres of property located at 1600 and 1630 Lake Lucy Road. Applicant: Yosemite Holdings LLC. Owner: Almond & Carolyn Krueger and Craig & Deanna Claybaugh. The public hearing has been RESCHEDULED for May 17, 2016 in the City Hall Council Chambers. The meeting will begin at 7:00 p.m. This hearing may not start until later in the evening, depending on the order of the agenda. If you have questions regarding this proposal, contact Robert Generous at 952-227-1131 or by email: bgenerous(o)ci.chanhassen.mn.us, or visit the project web page at www.ci.chanhassen.mn.us/2016-09 ALAN ROBERT WEINGART ALMOND L & CAROLYN C KRUEGER ANDREW HEBERT 1685 STELLER CT 1600 LAKE LUCY RD 6566 SHADOW LN EXCELSIOR, MN 55331-9080 EXCELSIOR, MN 55331-9023 CHANHASSEN, MN 55317-9375 BART T & ANNETTE R ELLSON 1700 TEAL CIR EXCELSIOR, MN 55331-9097 BRYAN M SCHOEN 6630 LAKEWAY DR CHANHASSEN, MN 55317-7578 DAVID J & DARBY E WINTERS 1691 PINTAIL CIR EXCELSIOR, MN 55331-9098 DONALD M & CAROL OELKE 6431 YOSEMITE EXCELSIOR, MN 55331-9036 GWEN M WILDERMUTH REV TRUST 6672 LAKEWAY DR CHANHASSEN, MN 55317-7578 KEITH A & MARY JO REINHARDT 6530 SHADOW LN CHANHASSEN, MN 55317-9375 MARK & TRACY WILLIAMS 1655 LAKE LUCY RD EXCELSIOR, MN 55331-9024 MICHAEL C & SHARON F TODD 6540 SHADOW LN CHANHASSEN, MN 55317-9375 BREEJORGENSON 1731 WOOD DUCK CIR EXCELSIOR, MN 55331-9096 CRAIG & DEANNA CLAYBAUGH 1630 LAKE LUCY RD EXCELSIOR, MN 55331-9023 DAVID L PETERSON 6451 YOSEMITE EXCELSIOR, MN 55331-9036 ESTATE DEVELOPMENT CORPORATION 1520 WAYZATA BLVD WAYZATA, MN 55391- KATHRYN J BERSCHEIT 6470 YOSEMITE AVE EXCELSIOR, MN 55331-9037 LAW RENCE H & NANCY S MCDOW ELL 6663 LAKEWAY DR CHANHASSEN, MN 55317-7578 MARK R RANDALL 6460 YOSEMITE EXCELSIOR, MN 55331-9037 MICHAEL RISHAVY 6440 YOSEMITE AVE EXCELSIOR, MN 55331-9037 BRIAN R & JENNIFER B JOHNSON 6639 LAKEWAY DR CHANHASSEN, MN 55317-7578 DANIEL D & MARY KATHRYN SISSEL 1710 TEAL CIR EXCELSIOR, MN 55331-9097 DAVID W & HOLLY A JUDD 1731 WOOD DUCK LN EXCELSIOR, MN 55331-9076 FLOREK FAMILY TRUST 1641 WOOD DUCK LN EXCELSIOR, MN 55331-9094 KATHRYN KENYON RANDALL 1571 LAKE LUCY RD EXCELSIOR, MN 55331-9022 MARC & RENEE SCHUBBE 6550 SHADOW LN CHANHASSEN, MN 55317-9375 MATTHEW D & STACY A HASTAD 1430 LAKE LUCY RD CHANHASSEN, MN 55317-9382 MICHAEL T & LYSSA L CAMPBELL 1671 PINTAIL CIR EXCELSIOR, MN 55331-9098 NEIL R & KATHLEEN CAULEY NICHOLAS J WALSTROM PATRICK J JOHNSON 1701 PINTAIL CIR 1721 WOOD DUCK LN 1700 LAKE LUCY RD EXCELSIOR, MN 55331-3100 EXCELSIOR, MN 55331-9076 EXCELSIOR, MN 55331-9025 PAUL ORVIS TWENGE PHILIP C & MARGARET A MARSTON PHILIP R THIESSE 1720 WOOD DUCK LN 1681 PINTAIL CIR 1675 STELLER CT EXCELSIOR, MN 55331-9077 EXCELSIOR, MN 55331-9098 EXCELSIOR, MN 55331-9080 RAMESH GURUSAMY 6612 LAKEWAY DR CHANHASSEN, MN 55317-7578 ROBERT J & SANDRA A KENDALL 1645 LAKE LUCY RD EXCELSIOR, MN 55331-9024 SHAUN D NUGENT 6560 SHADOW LN CHANHASSEN, MN 55317-9375 SUSANJORGENSEN 6510 YOSEMITE EXCELSIOR, MN 55331-9038 TROY M PARRISH 6480 YOSEMITE AVE EXCELSIOR, MN 55331-9037 WILLIAM P STROUT JR 1670 LAKE LUCY RD EXCELSIOR, MN 55331-9023 RICHARD S & JULIE A SAFFRIN 1661 WOOD DUCK LN EXCELSIOR, MN 55331-9094 ROGER L & CHARLOTTE J FRERICHS 6648 LAKEWAY DR CHANHASSEN, MN 55317-7578 SHERYL K LARSON 1711 WOOD DUCK LN EXCELSIOR, MN 55331-9076 THOMAS ALAN STEWARD 6471 YOSEMITE EXCELSIOR, MN 55331-9036 TUCKER & ALEXANDRA M MASUI 6619 LAKEWAY DR CHANHASSEN, MN 55317-7578 ROBERT A & LINDA M GUNDERSEN 1690 WOOD DUCK LN EXCELSIOR, MN 55331-9093 RYAN WILLIAM YANKOUPE 6481 YOSEMITE EXCELSIOR, MN 55331-9036 SUKO BUDIJONO 1721 WOOD DUCK CIR EXCELSIOR, MN 55331-9096 TIMOTHY J LINDQUIST 1650 LAKE LUCY RD EXCELSIOR, MN 55331-9023 WEEKLEY HOMES LLC 1111 N POST OAK RD HOUSTON, TX 77055-7310 LAKE LUCY ROAD; NEW RESIDENTIAL NEIGHBORHOOD RESPONSES TO STAFF RECOMMENDATIONS to PRELIMINARY PLAT FLING. Planning Commission Meeting, Tuesday, May 17, 2016 We are in full agreement with 76 of 80 conditions of approval. Following the section labeled RECOMMENDATIONS on Page 19, there are seven topics, with conditions. Seventy six of these conditions are standard and typical of final plats, construction plans and details. We will accommodate all of these requests in our revised plans. Please see our responses to the following 4 conditions: Note — Three of these four items can be accommodated, but we would like to share some comments for your consideration. Because we are concerned that these conditions will either adversely impact environmental quality, impose added cost without any real benefit, we would like these conditions to be discussed, and ideally, removed as conditions of approval. Engineering Recommendation number 14 is a significant concern to us for the reasons described below. "Engineering: Condition 14. Retaining walls and entry monument... shall be relocated outside standard perimeter drainage and utility easement boundaries, excepting the retaining wall on Lots 5 and 6." Developer & Consultant Observation: The positions of the retaining walls on lots 5 and 6 serve the same function of assisting drainage, within the 'drainage easements" as do the retaining walls on Lots 8, 9 and la The walls on each one of these lots is critical to the proper drainage and runoff flows, as well as sustaining a suitable area for home construction. Significantly, forcing the walls off of drainage easements, (specifically titled for such use), is an exceptional and unusual requirement that will cause harm. This would impose adverse effects on the functions and values of lots and inhibit drainage, while providing no benefits. We, therefore, request that this Engineering Condition #14 be deleted/ The other three conditions we have concerns regarding are the following: We are being asked to move our entrance monument outside the drainage and utility easement. We have successfully placed entrance monuments within these easements throughout the Metropolitan Area. When they are carefully placed where they won't impede reasonable sight triangles these monuments se neither transportation nor pede rian safety problems. a And, as long as coordination is done with the relevant utility companies, building, grading and landscape contractors, there is neither any interruption of utility lines nor any drainage problems with this placement. A. "Environmental Resources Condition: 2. All required plantings must be located on private property outside of public right of way..." Developer & Consultant Observation: Creating a new neighborhood provides an opportunity to introduce the trees that have the greatest visual impact on a city; its boulevard -street trees. Excluding street tree planting from a residential neighborhood's boulevards causes a loss of beauty, and future value gains, at the minor and marginal benefit of potentially, lower maintenance. We understand the value of some limitations on planting with regard to a main collector such as Lake Lucy Road. However, the accepted and typical, well vetted detail has street trees centered between the sidewalk and back of curb, or between the property line and back of curb. That is what our planting plan shows. In these times of tight municipal budgets, and the Emerald Ash Borer, the provision of street -boulevard trees, (conforming to city -approved tree species preferences), is a way to further beautify the city, while also improving the long term values, aesthetics and temperature moderations within new Chanhassen neighborhoods... without direct cost to the City. We, therefore, request that this condition #2 be deleted. B. "Water Resources: Condition 3: "... achieve a new overall reduction of at least 90% of total suspended solids .... This includes manipulation of the NURP50 Particle Distribution'. Developer & Consultant Observation: The effect of these changes, (and proposed "manipulations" of generally accepted stormwater software input parameters), would result in multiple stormwater management devices. These would likely result in decreased removal efficiency and increase city maintenance obligations and costs. There is no ordinance standard that requires this requested change. The manipulation of these parameters will not likely advance the total management goals, they simply add redesign costs. We, therefore, request that this condition #3 be deleted. C. "Water Resources: 18: Efforts shall be made to raise the elevations of Lots 2 through 5 to assure positive flow towards the street and ultimately to the treatment devices. Developer & Consultant Observation: The grading design on the preliminary plat shows a graded pad that is larger than the actual home footprint. In any event the grading design shows water being conveyed both to the street and, via side yards, to the rear yard and drainage swales. This is a common practice, and positive drainage will be provided. Building Requirement #4 on pg. 19, ensures that final grading plans for each lot and home will be in conformance before building permits are issued. Generous, Bob From: Renee Schubbe <Schubbel@msn.com> Sent: Tuesday, May 17, 2016 9:55 AM To: Generous, Bob Subject: Lake Lucy Road Development Hello! I am unable to make it to the Planning Commission Meeting tonight, but wanted to let my view of the proposed development be known. I am opposed to this development and hope that it will not be approved as it stands right now. The proposed destruction of over 200 trees on that lot is unacceptable to me. I watched as the trees were taken down at the David Weekly development across the street from this one, and I was appalled that the city was allowing it. As a private homeowner, I feel that the city would not allow me to take down that many trees on my own property, but seems to have a double -standard when it comes to developers. Even though the developer is proposing to plant new trees, it does not fit with the character of Chanhassen, and especially the area along Lake Lucy Road, to have new, young trees instead of our beautiful mature ones. I hope that the City of Chanhassen, and the Planning Commission, will not approve this development and the proposed destruction of over 200 trees on this lot. Thank you for your time. Sincerely, Renee Schubbe 6550 Shadow Lane Chanhassen, MN ALAN & MARY WEINGART May 17, 2016 TO: City of Chanhassen Chanhassen Planning Commission RE: Yosemite Holding, LLC Rezoning Request 1600 and 1630 Lake Lucy Road Planning Commission Members, Unfortunately, I will be unable to attend tonight's Planning Commission meeting due to a business conflict that has taken me out of town. I lieu of attendance, I wanted to express some concerns regarding the proposed development referenced above. First of all, I am NOT opposed to the development of the indicated property. Landowners have the right, within limits, to do what they want with their own land. The issue I have is when that development has a potential, and in this case likely, detrimental impact on neighboring properties. Mary and I are the owners of a portion of the property directly to the south of the subject development. We, along with the Kendall's and Randall's, own the property noted in the recent staff report as the "Southern Drainage Area". Our own property happens to be the 1800' driveway that extends from Lake Lucy Road out to the 11 acre so-called "island" in Lake Lucy. (We also have our primary residence down Lake Lucy Road and up Steller Court at 1685 Steller Court.) The Southern Drainage Area is made up primarily of wetlands, a portion of which I was required to mitigate when we put our driveway in back in 1999-2000. This is very low property that "holds" water for quite some time after heavy rains and/or snowmelt (when there used to be such a thing!). There is NO DRAINAGE from this basin into Lake Lucy or anywhere else, so the water accumulates and slowly percolates into the wetlands or evaporates ..... the only two options. The staff report makes an interesting observation when it says on page 6 that "Regardless of which path the drainage takes relative to the driveway; it all ends up in a third wetland with no constructed outlet although it appears that it does drain overland to Lake Lucy if it bounces approximately five (5) feet." (emphasis added). "Bounces .... 5... feet? I suspect that this is a technical engineering term of art, but I have never seen this occur in this area nor can I imagine such happening. I do, however, agree that the water would need to rise in that wetland basin about 5 feet BEFORE it would begin to make its way to Lake Lucy. AND, if that were the case, my driveway would be under water about 4'/2 feet, along with the Kendall's home being partially flooded! The point being made here is that the prospect for southerly discharge of water is quite detrimental to the property owners that I have mentioned, and 1 would propose that our driveway would be the first property negatively impacted by such discharge. This potential for standing water that covers or degrades my driveway at the lowest point through these wetlands seriously impacts the value of my island property as it is the only means of reaching that 11 acre parcel. The staff report attempts to address the mitigation of this problem, but, in my opinion, raises more concerns than it resolves. The division of the development into "two major drainage area(s)" creates a significant area from which water will flow into the Southern Drainage Area. Some particularly troubling statements from the report are as follows: 1685 STELLER COURT, EXCELSIOR, MN 55331 Telephone: Work: (612) 376 4005 Mobile: (952) 239 5899 Home: (952) 474 6884 Email: Work: aweingart@doughertymarkets.com Home: alweingartna visi.com ALAN & MARY WEINGART i Page 6: When addressing my driveway, the report states, "nor does it appear designed to city standards." When I put this driveway in, it was certainly vetted and approved by the City and about 15 other state and federal agencies. Please review the records as this was not a renegade homeowner acting on his own! ■ Page 6: "Staff agrees that the lack of easement and infrastructure makes it untenable to send any additional runoff to the south. These property owners should not bear the responsibility for the stormwater management of the subject property." ■ Page 6: "The development of the site must not direct any additional volume of runoff to the south. Further, rates must not be increased over existing rates for any scenario." ■ Page 6: "The current plan...... still directs the majority of lots 1 through 7 to the south." ■ Page 6: Apparently, one solution is to "employ downspouts" to assist in the direction of the roof drainage to the north. Who is going to police this once the development is done? The staff report even questions this on page 7 when they add, "While this could work in principal, the practice of this will be difficult [to] implement, inspect and compel compliance." ■ Page 7: All of this leads staff to conclude that it is highly unlikely that more water is not being directed south than is claimed." ■ Page 7: "It is intuitive that a site, after mass grading, will be more compacted than under current conditions. Mass graded sites intentionally compact soils to increase strength for paved areas and building pads. This increase in compaction leads to an increase in bulk density and a decrease in soil porosity. This translates into an increase in the volume of water running off the site." These are just a few of the statements that staff has made throughout their thorough report that question the southerly flow of stormwater discharge and how this problem is being mitigated. The only potential solution that I can envision (and I am not an expert on these matters) is for the stormwater to be diverted: 1. To the eastern wetlands as is being proposed for the northern section of this development, 2. Through Pheasant Hills Park to the wetlands on the southerly side of that park north of Lake Lucy Lane, or 3. Down Lake Lucy Road to the west so that it ultimately drains into the wetlands to the west of Steller Court (admittedly, a difficult redirection). Having the stormwater from roughly half of this development flow to the Southern Drainage Area with no interruption (not even a holding pond) will be significantly detrimental to my property, and that of my neighbors, as well. And, any monitoring of this once the development has been done will be virtually impossible and unenforceable. Once again, I apologize for not being able to attend the May 17'h Planning Commission meeting, but hope you will take our concerns under consideration in your assessment of this development. Thank you for your time and commitment to the City of Chanhassen as your task is not an easy one. Regards, 1685 STELLER COURT, EXCELSIOR, MN 55331 Telephone: Work: (612) 376-4005 Mobile: (952) 239-5899 Home: (952) 474-6884 Email: Work: aweingart@doughertymarket5.com Home: alweingart@Nsi.com May 18, 2016 To: City of Chanhassen Chanhassen Planning Commission Chanhassen City Council Re: Yosemite Holding, LLC Rezoning Request 1600 and 1630 Lake Lucy Road Planning Commission and Council Members, I attended the meeting Tuesday (5/17/16) evening and realized there was more that needed to be stated about my concerns regarding the drainage from the above rezoning and subdivision. The 100 year rain was mentioned by staff at the meeting last evening which I believe was stated at 6" in 24 hours, this seems to be happening more often than once in a 100 years. There have been many times in the past and will be more in the future when we get more than that in a few days of steady rain. Last fall (Oct. -Nov 2014) we received more than 6" in a few days of constant rain. My property received so much water that I could have had a skating pond over the winter on the area where the water ponds on the north side of my property. This "pond" greatly exceeded the "normal' high water markers placed on my property years ago. How can the currently proposed plat NOT increase drainage onto my and the adjoining properties when especially since the developer states they will have to haul in many tons of earth to do the proposed building of these homes. The current soil is basically clay which causes a lot of runoff so what type of soil will be brought in to reduce this? Staff mentions packing of the soil on the property as a concern. If soil compaction is done in the "usual' way it will be packed to densely and increase more drainage to the south. How will this be monitored or dealt with? Looking at the latest elevations (pages 4 and 6 of commission packet) of lots 1- 6 and possibly 7 the runoff to the south can only be more than present. How will the drainage be monitored to make sure it is not more than what currently drains south? Since there is no direct drain to Lake Lucy from mine or neighbor properties when the water has nowhere to go it backs up onto my property. There have been times in the 20 years I have owned this property that the northern part of my property has been basically inaccessible due to the amount of moisture there. This may be great to drown the wild garlic but also great for the mosquito population. I would like to see a comparison of the existing elevations compared to the proposed elevations for this project and have someone explain to my neighbors and me how the drainage to the south from current proposed preliminary plat will NOT increase due to the change. I will be out of town for the next few days but would like to take this opportunity to invite the council members, staff and whomever to come walk the properties on the south side of Lake Lucy Road after Memorial Day to really SEE the problem that could be caused if drainage into this area is increased at all! Bring your water boots... Sincerely, Betsy (Kathryn) Randall 1571 Lake Lucy Road 952-474-6522 wild-f�, LAKE LUCY ROAD; NEW RESIDENTIAL NEIGHBORHOOD RESPONSES TO STAFF RECOMMENDATIONS to PRELIMINARY PLAT FILING. Planning Commission Meeting, Tuesday, May 17, 2016 We are in full agreement with 76 of SO conditions of approval. Following the section labeled RECOMMENDATIONS on Page 19, there are seven topics, with conditions. Seventy six of these conditions are standard and typical of final plats, construction plans and details. We will accommodate all of these requests in our revised plans. Please see our responses to the following 4 conditions: Note —Three of these four items can be accommodated, but we would like to share some comments for your consideration. Because we are concerned that these conditions will either adversely impact environmental quality, impose added cost without any real benefit, we would like these conditions to be discussed, and ideally, removed as conditions of approval. Engineering Recommendation number 14 is a significant concern to us for the reasons described below. "Engineering: Condition 14. Retaining walls and entry monument... shall be relocated outside standard perimeter drainage and utility easement boundaries, excepting the retaining wall on Lots 5 and 6." Developer & Consultant Observation: The positions of the retaining walls on lots 5 and 6 serve the some function of assisting drainage, within the "drainage easements", as do the retaining walls on lots 8, 9 and 10. The walls on each one of these lots is critical to the proper drainage and runoff flows, as well as sustaining a suitable area for home construction. Significantly, forcing the walls off of drainage easements, (specifically titled for such use), is an exceptional and unusual requirement that will cause harm. This would impose adverse effects on the functions and values of lots and inhibit drainage, while providing no benefits. We, therefore, request that this Engineering Condition #14 be deleted/ This condition will remain. Per Condition 14, the retaining wall on Lots 5 and 6 may stay inside the easement, but will require an encroachment agreement. That retaining wall must be under an encroachment agreement so that it can be removed when the properties to the west connect to the sanitary sewer near the wall. This is discussed further in the Utility Section of the staff report. For the other retaining walls, requiring them to be constructed outside of drainage and utility easements is not an "exceptional" or "unusual" requirement. The purpose of a perimeter drainage and utility easement is to provide an area for public and private utilities to access the lots and to provide a drainage way between the lots and set back from the building pads. The retaining wall locations proposed would inhibit these purposes. Retaining walls are neither drainage conveyances nor utilities and do not belong in a D&U Easement. The wall on Lot 9 is particularly problematic as maintenance of the wall would require encroachment onto Lot 10. The other three conditions we have concerns regarding are the following: We are being asked to move our entrance monument outside the drainage and utility easement. We have successfully placed entrance monuments within these easements throughout the Metropolitan Area. When they are carefully placed where they won't impede reasonable sight triangles these monuments cause neither transportation nor pedestrian safety problems. And, as long as coordination is done with the relevant utility companies, building, grading and landscape contractors, there is neither any interruption of utility lines nor any drainage problems with this placement. This condition will remain. The placement of the entrance monuments, as proposed, would be within a drainage and utility easement that is specifically dedicated for water and sanitary sewer pipe. When the City performs maintenance or replacement of these pipes, the monument would have to be moved at the expense and likely objection of the Homeowners Association. It is unacceptable to place an entrance monument within this drainage and utility easement, regardless of what the developer has done in other cities in the past. Additionally, the city does not permit monument signage within corner site triangles and would require any signage to be moved out of those site triangles. A. "Environmental Resources Condition: 2. All required plantings must be located on private property outside of public right of way..." Developer & Consultant Observation: Creating a new neighborhood provides an opportunity to introduce the trees that have the greatest visual impact on a city; its boulevard -street trees. Excluding street tree planting from a residential neighborhood's boulevards causes a loss of beauty, and future value gains, at the minor and marginal benefit of potentially, lower maintenance. We understand the value of some limitations on planting with regard to a main collector such as Lake Lucy Road. However, the accepted and typical, well vetted detail has street trees centered between the sidewalk and back of curb, or between the property line and back of curb. That is what our planting plan shows. In these times of tight municipal budgets, and the Emerald Ash Borer, the provision of street -boulevard trees, (conforming to city -approved tree species preferences), is a way to further beautify the city, while also improving the long term values, aesthetics and temperature moderations within new Chanhassen neighborhoods... without direct cost to the City. We, therefore, request that this condition #2 be deleted. The condition will remain. Trees planted on private property near the front property line will still provide a 'boulevard tree' feel to the street but be less exposed to damage from snow plow or sweeping operations as well as out of sight line and utility conflicts. B. "Water Resources: Condition 3: "... achieve a new overall reduction of at least 90% of total suspended solids .... This includes manipulation of the NURP50 Particle Distribution". Developer & Consultant observation: The effect of these changes, (and proposed "manipulations" of generally accepted stormwater software input parameters), would result in multiple stormwater management devices. These would likely result in decreased removal efficiency and increase city maintenance obligations and costs. There is no ordinance standard that requires this requested change. The manipulation of these parameters will not likely advance the total management goals, they simply add redesign costs. We, therefore, request that this condition #3 be deleted. The condition will be modified to read as shown below. "The stormwater management practices shall achieve a net overall reduction of at least 90% for total suspended solids and 60%for total phosphorous using industry accepted removal rates. This includes manipulation of the NURP50 Particle Distribution filtration efficiencies to match accepted literature values." The condition was misstated. The NURP particle distribution remains unchanged. What must change is the efficiency with which the particle removals will occur. The default removal efficiencies assume that 100% of the water is infiltrated to the water table. The proposed systems are designed to have a piped outlet (underdrain and/or surface flow) meaning there will be little to no infiltration. As such, the assumed removal efficiencies are incorrect and are incongruent with accepted literature values and overstate the removal of phosphorous and particulates from the runoff. Code requires that water quality standards of 90%TSS and 60%TP reduction are met. Section 19-144 reads as follows: (3) Newly constructed or modified detention basins shall provide storage volume below the outlet (dead storage) to allow for water quality treatment in accordance with the following, whichever is most restrictive: a. Water quality features meeting the MPCA NPDES construction permit for permanent stormwater management systems; b. Water quality treatment consistent with NURP criteria (90 percent removal of TSS and 60 percent removal of TP for a standard NURP particle size distribution) C. "Water Resources: 18: Efforts shall be made to raise the elevations of Lots 2 through 5 to assure positive flow towards the street and ultimately to the treatment devices. Developer & Consultant Observation: The grading design on the preliminary plat shows a graded pad that is larger than the actual home footprint. In any event, the grading design shows water being conveyed both to the street and, via side yards, to the rear yard and drainage swales. This is a common practice, and positive drainage will be provided. Building Requirement #4 on pg. 19, ensures that final grading plans for each lot and home will be in conformance before building permits are issued. The condition will remain. As presented, the high point is at the front of the building pads on the grading plan. As such, only the front yards will be directed towards the street. The remainder of the lots will discharge to the rear towards the area in question south of Lake Lucy Road. This is a development level issue and not a responsibility to be borne by the builder. In fact, it may be too late at that time to address drainage concerns. If the indicated pad size is the issue then I would suggest altering the pad size to accommodate the anticipated home. The watershed draining to the south must not only be limited to the greatest extent practicable but the assumed drainage areas must match what the proposed grading plan shows. I(�p -09 CITY OF CHANHASSEN P O BOX 147 CHANHASSEN MN 55317 07/18/2016 1:48 PM Receipt No. 00321362 CLERK: AshleyM PAYEE: Yosemite Holdings LLC 245 W Point Road Excelsior MN 55331- 1600 & 1630 Lake Lucy Road (Anthum on the Park)-- Planning Case 2016-09 ------------------------------------------------------- Final Plat 700.00 Total Cash Check 4002 Change 700.00 0.00 700.00 0.00 Affidavit of Publication Southwest Newspapers CITY OF CHANHASSEN State of Minnesota) CARVER & HENNEPIN )SS. COUNTIES NOTICE OF PUBLIC County of Carver ) HEARING PLANNING CASE NO. 2016-09 NOTICE IS HEREBY GIVEN that the Chanhassen Planning Commission will hold a public Laurie A. Hartmann, being duly sworn, on oath says that she is the publisher or the authorized hearing on Tuesday, May 3, at agent of the publisher of the newspapers known as the Chaska Herald and the Chanhassen Vil- 7:00 P.M. in the Council Chambers lager and has full knowledge of the facts herein stated as follows: in Chanhassen City Hall, 7700 Market Blvd. The purpose (A) These newspapers have complied with the requirements constituting qualification as a legal of this hearing is to consider newspaper, as provided by Minnesota Statute 331 A.02, 331 A.07, and other applicable laws, as a request for Rezoning from amended Rural Residential District (RR) to Single -Family Residential �. District (RSF), and preliminary (B) The printed public notice that is attached to this Affidavit and identified as No. Plat with variances for a 12- was published on the date or dates and in the newspaper stated in the attached Notice and said lot subdivision on 6.96 acres of Notice is hereby incorporated as part of this Affidavit. Said notice was cut from the columns of property located at 1600 and 1630 the newspaper specified. Printed below is a copy of the lower case alphabet from A to Z, both Lake Lucy Road. Applicant: inclusive, and is hereby acknowledged as being the kind and size of type used in the composition Yosemite Holdings LLC. Owner. and publication of the Notice: Almond & Carolyn Krueger and Craig & Deanna Claybaugh. abcdefghijklmnopgrst z A plan showing the location forthe proposal is the available By VV VV'� for public review on the City's web site at www.ci.chanhassen. mn.us/2016-09 or at City Hall Laurie A. Hartman during regular business hours. All interested persons are invited to attend this public hearing and express their opinions with Subscribed and sworn before me on respect to this proposal. Bob Generous, AICP, Senior Planer Email: bgenemusea ,i� '�`� ci.chanhassen.mmus this��dayOf U 2016 Phone: 952-227-1131 (Published in the Chanhassen 016: No. LEINE7E AR KvnTnnra yApriz1, -2JYMM4)YNTA- WNNESCITA CNblARfl601,01/'6i RATE INFORMATION Lowest classified rate paid by commercial users for comparable space.... $31.20 per column inch Maximum rate allowed by law for the above matter ................................. $31.20 per column inch Rate actually charged for the above matter ............................................... $12.59 per column inch Generous, Bob From: Aanenson, Kate Sent: Tuesday, May 03, 2016 4:23 PM To: Generous, Bob Subject: FW: Proposed Development on Lake Lucy and Yosemite of 12 New Homes From: Laufenburger, Denny Sent: Tuesday, May 03, 2016 3:01 PM To: Aanenson, Kate Subject: Fwd: Proposed Development on Lake Lucy and Yosemite of 12 New Homes Denny Laufenburger Mayor, Chanhassen 612-327-6800 Sent via iPhone Begin forwarded message: From: "Laufenburger, Denny" <DLaufenburgeraa ci.chanhassen.mn.us> Date: May 3, 2016 at 10:13:32 AM CDT To: Mary Henderson <mkhendersona-mchsi.com> Subject: Re: Proposed Development on Lake Lucy and Yosemite of 12 New Homes Mary - Thank you for sharing your thoughts and concerns. Yes, Chanhassen Is changing. We are no longer that community of 5,000 as we were 30 years ago. Development on all fronts continue. As your council, it is our job to do what we can to preserve and protect the character and qualities of the city that make it attractive to people that want to experience what we all enjoy. Change is going to happen. We are better stewards of our community when we guide and manage that change, rather than react without vision. I will keep your thoughts in mind as this comes before the council for review. Thank you. Denny Laufenburger Mayor, Chanhassen 612-327-6800 CenterPoint, 700 west Linden Avenue PO Box 1165 Energy Minneapolis MN 55440-1165 April 13, 2016 City of Chanhassen Robert Generous, AICP Senior Planner P.O. Box 147 Chanhassen, MN 55317 RE: Proposed Rezoning and preliminary plat with variances for a 12 lot subdivision. Dear Mr. Generous: Concerning your request, CenterPoint Energy has no objection to this site place review at this time. If you have any questions, please contact me at 612-321-5381. Respectfully, CENTERPOINT ENERGY �1� /� Chuck Mayers Right -of -Way Specialist Engineering Services charles.mayers@centerpointenergy.com 612-321-5381 1600 & 1630 Lake Lucy Road Page 1 of 8 Grading & Drainage pw A�Ios —The existing togopraphic survey shall show a minimum of 100 feet outside the development 1 'L boundaries and include the existing first floor elevations of nearby structures. p �14V Storm sewer and treatment areas shall be shown on the grading plaan.l. p b E` `PS a y� [Based on the buil in g nads shown, the hardcover area generating stormwater runoff on Lots 1-4 and 6-1 exceed the 25% maximum without taking the driveways into account. Many�reatlxcee,05% and go as high as 37% hardcover. The applicant shall show building styles and 0L�hriveways to confirm their ability to meet the 25% maximum hardcover requirement Gk-t .To The lots shall be graded to drain away fr< proposed building locations. Spot elevations shall firrv. be shown on the plans to verify that water will drain away from buildings at the following p6rt locations: Lot 6 backyard, Lot 7 backyard, the east side of Lot 1, the front yard of Lot 2. Lot 9 oNFt«s !.appears to drain toward the building on the north and west side. Lot 9 grading shall be revised to L". .si#466d&zro ute water away from the building pad. Z-Til.a K "of cva �w^ I. s ao�sy l.aJs �p, Inr4a >6W-.w6 fir• P NO?.Iwpa gV'L .CJ-f4'P? Lots 2, 3 4 and 5 on the southern half of the property show little or no level back yard area. For a example, Lot 3 has a 3-foot level area, then a 3:1 slope (the maximum allowed within a r,, a-tlp;a subdivision) goes down 10 feet in elevation to a 12-foot level area around the stormwater pond. V IKn . This will likely be problematic for future owners of these lots as the ' 1 VN. ck and area for recreational use. At a minimum, the grading=be to provide a 10-foot by 10-foot level area at all exterior egress points. ,`� Newea w#w.T 4e-retW Foil In the proposed plan, Lots 6-9 have been artificially created as walkouts through construction of LC I'Te ^r OF three retaining walls 5-9 feet tall and routing stormwater through the center of their backyard at a 'fyt D~cp shallow slope: approximately 2% at Lot 6, 3% at Lot 7, 2% at Lot 8, and 3-4% at Lot 9. The TO 9 center of this drainage route would be as little as 12 feet behind the building pad of Lot 9. This will likely be problematic for future owners of these lots as there is often an expectation to have a level, dry backyard area for recreational use. Lots 6-9 should be a rambler -style home, as this would fit better with the grading on surroundmg properties and allow the applicant to create more effective drainage for these lots, rather than excavating down and constructing retaining; walls to force a walk -out style home onto the lot. T�� t DesIo� d� s° The front yards of Lots 3, 4 and 5 appear to drain water towards Feuilding pad or would have ( N d Y� a flat driveway grade. The front yard grading plan shall be revised to allow minim 0.5% slope on the driveways and to drain away from the proposed building pad. � � �'� o f Nz a�Py,e.+f R i>' The backyard drainage on Lot 12 shall be revised to a minimum of 2%. ✓ `1ov Draintile is required for all lots where stormwater runoff will flow from the back tethe front off the property. Draintile shall be shown the plans fqr Lots 66, 7� 9. \ \ The plan shall show EOF locations and elevation for all basins and wetlands on site. All EOF shall be at least 1 foot below the lowest opening of adjacent homes. 1600 & 1630 Lake Lucy Road �;F M Page 2 of 8 r�C � p The low point near the Lots 5 and 6 retaining wall and the low point orl the cul-de-sac bubble shall be incorporated into the storm sewer system to drain. ti"k NO< To minimize additional stormwater runoff created by long driveways required for the "flag" or "neck" lot variance, the applicant shall install a 10-foot driveway for the length of the "neck". t5 Pf The applicant shall identify the discharge point of the culvert shown on the existing topography �r near the existing driveway of 1600 Lake Lucy Road. If it is a driveway culvert, the applicant �A shall have it removed or bulkhead and abandoned. Erosion Prevention and Sediment Control The plans shall identify the areas intended for stockpiling materials on site during construction. Retaining Walls The applicant has proposed four retaining walls as part of this subdivision. The wall south of the southeastern wetland is approximately 100 feet long and 4 feet tall. Street A is above this wall, and the southeastern wetland is below the wall. As the sidewalk shall be ✓ moved to the south side of Street A, the retaining wall shall be minimized as much as possible. The retaining wall shall be shifted out of the right-of-way.14"! The retaining wall on the western property line of Lot 8 is approximately 55 feet long and 5 feet tall. The backyard of Lot 8 is below the wall. ? q s � �> Thretaining wall on Lot 9 is approximately 110 feet long and 6 feet tall. The backyard of 0 PC Lo 8 s below the retaining wall. This wall shall be relocated outside the drainage and utility easement. This wall shall be eliminated or reduced size by changjpg the home style of Lots 8 p q� and 9 to ramblers NMz. The retaining wall on the eastern property line of Lot 9 is approximately 80 feet long and 4 feet/ tall. The building pad of Lot 10 is below this wall. Top and bottom wall elevations shall be shown for this retaining wall. This wall shall be relocated outside the drainage and utility easement. The retaining wall at the comer of Lots 5 and 6 is approximately 125 feet long and 9 feet tall. The sideyard of Lot 5 and the backyard of Lot 6 are below this wall. This wall crosses the lot line and thus is on both Lot 5 and 6. Any wall that crosses lot lines shall be owned and�� a f' maintained by a Homeowners Association (HOA). The development plans shall call out the material of the retaining wall. The following materials are prohibited for retaining wall construction: smooth face, poured in place concrete (stamped or 1600 & 1630 Lake Lucy Road Page 3 of 8 patterned is acceptable), masonry, railroad ties and timber. Boulder walls shall not be taller than Ott six feet. RIGHT-O&WAY AND EASEMENTS The survey included all easements and right of way shown on the title search of the property t� dated November 20, 2015 from Stewart Title Guarantee Company. The applicant shall have their survey confirm this with a recent title survey before final plat. The applicant proposes a 60-foot right-of-way over Street A and 60-foot right-of-way radius over the cul-de-sac bubble. The plat maintains the existing, 66-foot right-of-way easements for Lake Lucy Road and Yosemite Avenue. Easements over drainage basins and storm water pipes shall be called out as "Drainage and /" Utility" easements. d� Three retaining walls and two entry monuments are proposed w tin City easements or right of way. These elements shall be relocated outside of the easement. The retaining wall on Lots 5 ✓ and 6 requires an encroac ent agreement. Additional drainage and utility easement shall be granted on Lot 1 to provide 10-feet from the center of the sanitary sewer main. Per § 18-78, staff would like the applicant to examine providing future access for adjacent properties to the west, 1650 and 1670 Lake Lucy Road. Staff recommends an access easement over the north 35 feet of Lot 5 for a future private street to service Lot 5 and the future subdivided properties on existing 1650 and 1670 Lake Lucy Road. STREETS, DRIVEWAYS & SIDEWALK The applicant proposes construction of a public street, Street A. The applicant shall name this street with coordination with the Fire Marshall prior to submittal for final plat review. Street A is proposed to City standards at 31 feet wide and using the Chanhassen Standard Detail typical section. The applicant shall include the horizontal alignment tabulation for Street A in the plans. Access to the subdivision from Street A is located south of the southeastern wetland. This location was chosen after examining three locations: off of Lake Lucy Road, Yosemite Avenue north of the wetland, and Yosemite Avenue south of the wetland. The Lake Lucy Road intersection alternative was eliminated because of sight -distance concerns around the curve on Lake Lucy Road and the desire for access control on Lake Lucy Road, a Major Collector roadway. The Yosemite Avenue access north of the wetland was eliminated due to environmental concerns from running a roadway between the two wetlands across their EOF point and future maintenance concerns due to a long road extension that is surround by wetland instead of servicing properties. 1600 & 1630 Lake Lucy Road Page 4 of 8 The applicant shall appty fora variance to the requirement of 300-foot spacing between local roads per § 18-57. The access location on Yosemite, sou—th o e we ran reusing engineering discretion and the guidelines set forth in the 2030 Comprehensive, the proposed intersection offset seems reasonable as the proposed 12 lot subdivision would generate less traffic than a multiple commercial driveway. The applicant's engineer completed a queuing analysis to confirm that traffic queuing to make a left turn into the proposed development would not affect the function of the Lake Lucy Road & Yosemite Avenue intersection. A street light shall be installed at the intersection of Street A and Yosemite Avenue. 1 Driveways shall be shown on the plan in the final plat submittal. Driveways shall be designed to Y �Y meet all standards in City Code §20-1122. Only one driveway access point is allowed form a single residential lot to the street. To minimise additional stormwater runoff created by long M S'/� driveways required for the "flag" or "neck" lot variance, the applicant shall install a 10-foot IL driveway for the length of the "neck". The sidewalk within the development shall move to the south side of the street. This eliminates the need for pedestrian ramps at the intersection of Street A and Yosemite Avenue. The pedestrian ramp on the northwest corner of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. The sidewalk along Yosemite Avenue is very close to the existing utility pole. This conflict will need to be resolved by either moving the sidewalk or the utility pole and shall be shown on the plan set. J l,�rA` V. ( s ON Q.v.N�9 col.= . UTILITIES Sanitary Sewer The applicant proposes an 8" PVC sanitary sewer main to be owned and maintained by the City, Due to the elevation of the adjacent sanitary sewer system on the east side of Yosemite, sanitary sewer for this subdivision does not meet the minimum depth required without insulation. The sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. The proposed shallow elevation of the sanitary sewer also necessitates Lot 2, 3 and 4 to use a private, in -home grinder system to pump waste to the public sanitary main which is a gravity flow system. The portion of the grinder pump services that lies within the right-of-way shall be gravity -flowing. it The minimum sanitary sewer grade that the City will accept is 0.401/o, therefore setting the ALAW design grade to this minimum is not advisable. The plan must have a design grade that developer and engineer are confident that the construction process will achieve the minimum of 0.40%. Sanitary sewer installed at less than 0.40% shall not be accepted by the City and must be reinstalled at the developer's expense. Staff recommends use of 0.50% minimum design grade. Per § 18-78, the applicant is required to install sanitary sewer main to the western property boundary to provide future extension to the adjacent properties: 1650 and 1670 Lake Lucy Road. It is unlikely they would be able to connect a gravity system to the sanitary main extension and 1600 & 1630 Lake Lucy Road Page 5 of 8 would likely require private grinder pump systems. Staff recommends locating the extension / between Lots 5 and 6, however, the retaining wall would need to be removed at the time of ✓ connection to the adjacent properties at the connecting party's expense. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. SMH 3 shall be moved outside the wheel path to the center of the road or center of the traveled lane. The sanitary services within the cul-de-sac bubble shall be revised to eliminate bends within the right-of-way. .� To reduce future maintenance needs for the City, SMH 1 location shall be adjusted to eliminate the need for SHM 2. e' The utility plan sheet shall be revised to call out the City of Chanhassen as the local authority in Note 13. Water Main The applicant proposes an 8" water main system. The plans shall call out C900 material for the water main pipe. The 90 degree bend shall be replaced with two 45 degree bends to reduce pressure on a single sharp turn of the main. The water main along Yosemite Avenue shall be shifted into the right-of-way. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer,, -- shall verify this when the utility profiles are drafted. >,S Two additional hydrants shall be installed, one at the intersection of Street A and Yosemite p s Avenue and one at Station 3+00 of Street A. ✓�s �� r+9 TALKING POINTS FOR TUESDAY'S MEETING: The existing togopraphic survey shall show a minimum of 100 feet outside the development boundaries and include the existing first floor elevations of nearby structures. 2. Storm sewer and treatment areas shall be shown on the grading plan.' ~ K i!�r 3. The applicant shall show building styles and driveways to confirm their ability to meet op1o� the 25% maximum hardcover requirement. 4. The lots shall be graded to drain away from proposed building locations. Z 1600 & 1630 Lake Lucy Road Page 6 of 8 5. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: Lot 6 backyard, Lot 7 backyard, the east side of Lot 1, the front yard of Lot 2. 6. Lot 9 grading shall be revised to route water away from the building pad. 7. At a minimum, the grading plan shall be revised to provide a 10-foot by 10-foot level area at all exterior egress points. 8. Lots 6-9 should be a rambler -style home, as this would fit better with the grading on surrounding properties and allow the applicant to create more effective drainage for these lots, rather than excavating down and constructing retaining walls to force a walk -out style home onto the lot. 9. The front yard grading plan shall be revised to allow a minimum of 0.5% slope on the driveways and to drain away from the proposed building pad. 10. The backyard drainage on Lot 12 shall be revised to a minimum of 2%. 11. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9. 12. The plan shall show EOF locations and elevation for all basins and wetlands on site. 13. All EOF shall be at least 1 foot below the lowest opening of adjacent homes. 14. The low point near the Lots 5 and 6 retaining wall and the low point on the cul-de-sac bubble shall be incorporated into the storm sewer system to drain. 15. To minimize additional stormwater runoff created by long driveways required for the "flag" or "neck" lot variance, the applicant shall install a 10-foot driveway for the length of the "neck". 16. The applicant shall identify the discharge point of the culvert shown on the existing topography near the existing driveway of 1600 Lake Lucy Road. If it is a driveway culvert, the applicant shall have it removed or bulkhead and abandoned. 17. The plans shall identify the areas intended for stockpiling materials on site during construction. 18. As the sidewalk shall be moved to the south side of Street A, the wetland retaining wall shall be minimized as much as possible. It shall be shifted out of the right-of-way. 19. The north retaining wall on Lot 9 shall be relocated outside the drainage and utility easement. This wall shall be eliminated or reduced in size by changing the home style of Lots 8 and 9 to ramblers 20. The retaining wall on the eastern property line of Lot 9 shall have top and bottom wall elevations shall be shown on the plan set. This wall shall be relocated outside the drainage and utility easement. 21. Any wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA). 22. The development plans shall call out the material of the retaining wall. The following materials are prohibited for retaining wall construction: smooth face, poured in place concrete (stamped or patterned is acceptable), masonry, railroad ties and timber. Boulder walls shall not be taller than six feet. 23. The applicant shall have their survey confirm all easements are show on the existing topographic plan with a recent title survey before final plat. 24. Easements over drainage basins and storm water pipes shall be called out as "Drainage and Utility" easements. 25. Two entry monuments shall be relocated outside of the easement. 1600 & 1630 Lake Lucy Road Page 7 of 8 26. The retaining wall on Lots 5 and 6 requires an encroachment agreement. 27. Additional drainage and utility easement shall be granted on Lot 1 to provide 10-feet from the center of the sanitary sewer main. 28. Per § 18-78, staff would like the applicant to examine providing future access for adjacent properties to the west, 1650 and 1670 Lake Lucy Road. Staff recommends an access easement over the north 35 feet of Lot 5 for a future private street to service Lot 5 and the future subdivided properties on existing 1650 and 1670 Lake Lucy Road. 29. The applicant shall name this Street A with coordination with the Fire Marshall prior to submittal for final plat review. 30. The applicant shall include the horizontal alignment tabulation for Street A in the plans. 31. The applicant shall apply for a variance to the requirement of 300-foot spacing between local roads per § 18-57. 32. To provide future access for the properties to the west, 1650 and 1670 Lake Lucy Road, the applicant shall provide an access easement over the north 35 feet of Lot 5 for a future private street to service Lot 5 and the future subdivided properties on existing 1650 and 1670 Lake Lucy Road. 33. A street light shall be installed at the intersection of Street A and Yosemite Avenue. 34. Driveways shall be shown on the plan in the final plat submittal. 35. Driveways shall be designed to meet all standards in City Code §20-1122. 36. To minimize additional stormwater runoff created by long driveways required for the "flag" or "neck" lot variance, the applicant shall install a 10-foot driveway for the length of the "neck". 37. The pedestrian ramp on the northwest comer of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. 38. The sidewalk along Yosemite Avenue is very close to the existing utility pole. This conflict will need to be resolved by either moving the sidewalk or the utility pole and shall be shown on the plan set. 39. The sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. 40. The portion of the grinder pump services that lies within the right-of-way shall be gravity -flowing. 41. Per § 18-78, the applicant is required to install sanitary sewer main to the western property boundary to provide future extension to the adjacent properties: 1650 and 1670 Lake Lucy Road. 42. The sanitary sewer/water main crossing on Lot I may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 43. SMH 3 shall be moved outside the wheel path to the center of the road or center of the traveled lane. 44. The sanitary services within the cul-de-sac bubble shall be revised to eliminate bends within the right-of-way. 45. To reduce future maintenance needs for the City, SMH 1 location shall be adjusted to eliminate the need for SHM 2. 46. The utility plan sheet shall be revised to call out the City of Chanhassen as the local authority in Note 13. 47. The plans shall call out C900 material for the water main pipe. 48. The 90 degree bend shall be replaced with two 45 degree bends to reduce pressure on a single sharp turn of the main. 1600 & 1630 Lake Lucy Road Page 8 of 8 49. The water main along Yosemite Avenue shall be shifted into the right-of-way. 50. Two additional hydrants shall be installed, one at the intersection of Street A and Yosemite Avenue and one at Station 3+00 of Street A. The following is a list of my main concerns with the plan as proposed. 1. Runoff rates and volumes cannot be increased to the south. ✓1 Under current conditions the southern and western 40% of the site drains to the south. It is conveyed through a culvert under Lake Lucy Road and discharges into a series of ditches, corrugated metal pipe culverts and wetlands. Water appears to overtop the drive under current conditions at the southern of the two culverts. In order to drain out of the third and final wetland, the water must bounce as much as 3 feet to leave the wetland and reach Lake Lucy. In discussions with Roger Humph he he suggested he would be able to address the watershed area by directing the front of lot 2 throug�lto the street and to the wetlands. It has yet to be seen how this will be accomplished. 2. The stormwater management practices shall achieve an overall reduction of at least 90%for total suspended solids and 60% for total phosphorous using industry accepted removal rates. The modeled design removal efficiencies were considerably greater than the values recognized by the Minnesota Stormwater Manual and other industry standards. This may be due to the limitations of the modeling software. TSS removal efficiency for a filtration device just using a sand media filter should be between 77% and 90%. The modeled removal was 97% and nearly 100%. TP removal efficiencies for the some device type should be between 28% and 56%. This is with additional Wq volume, pretreatment etc. None of which are shown in the design. The model is indicating that between 91% and 96% of the TP will be removed using these devices on this site. Using literature review values, removals for the site in aggregate are more likely between 73% and 84% for TSS and between 27% and 41 % for TP. The applicant must achieve the 90% TSS and 60% TP removal using removal efficiencies recognized as industry standards or otherwise justifiable. WETLAND NORTH: Filtration B OUTFLOW OUTFLOW OUTFLOW OUTFLOW JOUTFLOW 90%UT 80%LIT OUTFLOW 50%UT 30%LIT INFLOW MODEL REVIEW REVIEW INFLOW MODEL REVIEW REVIEW 608.8 2.31 &MI-121.761 2.011 0.081 1.005 1A3 WETLAND NORTH: Buffer INFLOW OUTFLOW MODEL OUTFLOW 60%LIT REVIEW OUTFLOW 39%LIT REVIEW OUTFLOW INFLOW MODEL OUTFLOW 10%UT REVIEW OUTFLOW 0%LIT REVIEW 358.61 11739 143.44 218.75 L66 1.26 1.491 1.66 W ETLAND EAST: Fi itrat�on INFLOW OUTFLOW MODEL OUTFLOW 90%LIT REVIEW OUTFLOW 80%LIT REVIEW [INFLOW OUTFLOW MODEL OUTFLOW " LIT REVIEW OUTFLOW 30%LIT REVIEW 799.53 21.13 79.95 159-921 2.64 0.23 1.32 1.85 POND SOUTH Tn_Al OUTFLOW OUTFLOW OUTFLOW 85%LIT OUTFLOW 50%LIT INFLOW MODEL REVIEW INFLOW MODEL REVIEW 25227 26.22 37.84 2.22 0.72 0.61 SITE MASS BALANCE TSS MODELED TP MODELED INFLOW OUTFLOW %AEDUcnoN INFLOW OUTFLOW %REDUCTION 2019.21 167.45 92% 7.53 2.29 70% TSS BEST CASE TSS WORST CASE INFLOW OUTFLOW %REDUCTION INFLOW OUTFLOW %REDUcnom 201921 322.11 84% 7.53 4.43� 41%41% TSS WORST CASE TP WORST CASE INFLOW OUTFLOW %REDUCTION INFLOW OUTFLOW %REDUCTION 2019.21 53826 73% 7.53 5.53 27% The applicant will explore enhanced treatment techniques such as MN Filter and pretreatment to justify greater removal efficiencies. Further, they will discontinue to model the buffer as a best management practice and will instead evaluate the construction of an additional biofiltration basin on lot 10. 3. The applicant shall prepare and submit a Surface Water Pollution Prevention Plan that contains all required elements from Parts III and IV of the NPDES/SDS Construction Permit. This shall be a standalone document. In order to review erosion prevention and sediment control practices comprehensively, a SWPPP needs to be provided. This SWPPP must be exclusive of the plan set so that it can be reviewed on its own merits. The city has modified a SWPPP review checklist developed by the PCA so that it is more specific to Chanhassen. This checklist can be made available upon request. 4. It will be required that six inches of topsoil be placed on all disturbed areas to be vegetated V/ throughout the subject property. This shall be reflected in the grading plan, erosion plan and SWPPP. 5. The upland area between the two wetlands shall be graded to allow for a safe and stable overflow from the north wetland to the east wetland. In order for the routing to function properly, a stabilized overflow swale will be necessary to route runoff to the east. This area shall be protected from soil losses to the wetland through erosion and shall be stabilized within 48 hours of completion of earth moving activities. The developer and the contractor shall submit a completed Landowner Statement and Contractor Responsibility form to the City. 6. Any disturbance of the buffer areas shall be restored with native vegetation appropriate to thc-� area and the plans shall note this and the seed mix to be used. All stormwater practices shall be place into a drainage and utility easement if not included in an outlot. An outlot will always be the preferred option. 8. An operations and maintenance manual shall be developed for the practices to be employed and submitted to the City. This document shall clearly indicate who is responsible for what tasks, schedule of anticipated maintenance milestones, detailed grading and planting plans including any appurtenant infrastructure. Staff is concerned about the long term viability of these biofiltration basins given their proximity to proposed house pads and potentially problematic access. The Zo I n ed to prepare an operations and maintenance manual for the features includina inspection schedule. The applicant will need to form a Home Owners' Association to assume ownership and responsibility for the maintenance of any landscaping the HOA may wish to have. The city will assume responsibility for the underdrains, refreshing the iron filings and any storm sewer conveyance into these features. The development contract shall reflect this and a drainage and utility easement shall be recorded over all features. 9. The plans and the O&M shall clearly indicated how reasonable and access will be granted to each practice and assured throughout the life of the practice. �oS pry •> f� Features that are not reasonably accessible may not be accepted by the city.—W 10. The development contract shall include language indicating that the Homeowners' Association shall be responsible for any landscaping work associated with the biofiltration features and the city shall maintain the associated infrastructure including the underdrain, the filtration media and the storm sewer conveyance system. 11. The wet detention pond shall be no larger in surface area or depth than is necessary. If the intent is to route the bulk of the water to the north there should be little need for a pond of this size. The depth of the pond lends to less desirable lots as the homes will walk out onto a 3:1 side slope down to the pond. 12. The wet detention pond shall be designed to have an emergency overflow skimmer outlet structure. Lake Lucy Road shall not be used as the emergency overflow and the existing RCP flared end section is cracked. 13. A detailed plan of the filtration basins, consistent with the MN Stormwater Manual shall be submitted with the final plat submittal for review and approval by city staff. It shall include, at a minimum, a plan view, a profile view, all necessary elevations, any in situ soil preparation, methodologies to be employed to protect from construction traffic, soil filter media V specifications, any plantings and any appurtenant work to be done. These plans shall reflect the MN Stormwater Manual recommendations and requirements for filtration basins. These plans shall be adequate for construction to engineering specifications without confusion. It has been the city's experience that the level of detail necessary for proper construction is lacking from these plan types. Cam' 14. Underdrains and drain tile shall have tracer wire and cleanouts and a butterfly valve shall be installed on the underdrain so that the outflow can be adjusted to achieve maximum infiltration. Currently the only justification for the absence of any infiltration is the geotechnical borings which were performed with the construction of house pads, roads, etc in mind and do not Se. necessarily reflect the potential for infiltration throughout the site. Gulliver, et al showed that up to 1 soil boring or permeameter test may be needed per 1,000 SF. 7 o� 144 15. Pretreatment shall be required for all filtration basins receiving piped discharge. 7 16. The biofiltration devices shall be designed and constructed as infiltration/filtration/recharge facilities unless it can be shown that a limitation such as less than 3 feet to ground water or bedrock is an existing condition. 17. The elevations of Lots 2 through 5 shall be raised to assure positive flow towards the street and ultimately to the treatment devices and to minimize flow to the south such that there is no increase in volume or rates leaving the site under Lake Lucy Road. It does not appear that the proposed drainage boundaries for P4, P5 and P5 are reflected in the grading plan. There appears to be poor drainage in the front yards and a steeper hydraulic gradient towards the back yards of these lots in this area. This may be further complicated by the trail moving to the south side of the cul de sac. 17 18. There is positive drainage towards the houses on Lots 7, 8 and 9. This is not an acceptable condition. 19. According to the grading plan, a low spot will be created on the southern lot line of lot 6 7 adjacent to the retaining wall. This is an unacceptable condition. . 20. Storm Water Utility Connection charges due at the final plat are estimated to be $58,880.00. Many of these items have been discussed with the consulting engineers and they are working to resolve those issues. However, in the absence of a plan set showing the resolution to be practical, all comments �— remaingermane at the time. This concludes my review. Thank you. &W���� Grading & Drainage The existing togopraphic survey shall show a minimum of 100 feet outside the development boundaries and include the existing first floor elevations of nearby structures. Storm sewer and treatment areas shall be shown on the grading plan. b Based on the building pads shown, the hardcover area generating stormwater runoff on Lots 1-4 and 6-10 exceed the 25% maximum without taking the driveways into account. Many greatly Vf-., exceed 25% and go as high as 37�ardcover. The applicant shall show building styles and driveways to confirm their ability to meet the 25% maximum hardcover requirement. r� The lots shall be graded to drain away from proposed building locations. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: Lot 6 backyard, Lot 7 backyard, the east side of Lot 1, the front yard of Lot 2. Lot 9 appears to drain toward the building on the north and west side. Lot 9 grading shall be revised to route water away from the building pad. -- Lots 2, 3 4 and 5 on the southern half of the property show little or no level back yard area. For example, Lot 3 has a 3-foot level area, then a 3:1 slope (the maximum allowed within a subdivision) goes down 10 feet in elevation to a 12-foot level area around the stormwater pond. This will likely be problematic for future owners of these lots as there is often an expectation to have a level backyard area for recreational use. At a minimum, the grading plan shall be revised to provide a 10-foot by 10-foot level area at all exterior egress points. In the proposed plan, Lots 6-9 have been artificially created as walkouts through construction of three retaining walls 5-9 feet tall and routing stormwater through the center of their backyard at a shallow slope: approximately 2% at Lot 6, 3% at Lot 7, 2% at Lot 8, and 34% at Lot 9. The center of this drainage route would be as little as 12 feet behind the building pad of Lot 9. This will likely be problematic for future owners of these lots as there is often an expectation to have a level, dry backyard area for recreational use. Lots 6-9 should be a rambler -style home, as this would fit better with the grading on surrounding properties and allow the applicant to create more effective drainage for these lots, rather than excavating down and constructing retaining walls to force a walk -out style home onto the lot. The front yards of Lots 3, 4 and 5 appear to drain water towards the building pad or would have a flat driveway grade. The front yard grading plan shall be revised to allow a minimum of 0.5% slope on the driveways and to drain away from the proposed building pad. The backyard drainage on Lot 12 shall be revised to a minimum of 2%. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9. The plan shall show EOF locations and elevation for all basins and wetlands on site. All EOF shall be at least 1 foot below the lowest opening of adjacent homes. 1600 & 1630 Lake Lucy Road Page 2 of 8 The low point near the Lots 5 and 6 retaining wall and the low point on the cul-de-sac bubble shall be incorporated into the storm sewer system to drain. To minimize additional stormwater runoff created by long driveways required for the "flag" or "neck" lot variance, the applicant shall install a 10-foot driveway for the length of the "neck". The applicant shall identify the discharge point of the culvert shown on the existing topography near the existing driveway of 1600 Lake Lucy Road. If it is a driveway culvert, the applicant shall have it removed or bulkhead and abandoned. Erosion Prevention and Sediment Control The plans shall identify the areas intended for stockpiling materials on site during construction. Retaining Walls The applicant has proposed four retaining walls as part of this subdivision. The wall south of the southeastern wetland is approximately 100 feet long and 4 feet tall. Street A is above this wall, and the southeastern wetland is below the wall. As the sidewalk shall be moved to the south side of Street A, the retaining wall shall be minimized as much as possible. The retaining wall shall be shifted out of the right-of-way. The retaining wall on the western property line of Lot 8 is approximately 55 feet long and 5 feet tall. The backyard of Lot 8 is below the wall. The north retaining wall on Lot 9 is approximately 110 feet long and 6 feet tall. The backyard of Lot 8 is below the retaining wall. This wall shall be relocated outside the drainage and utility easement. This wall shall be eliminated or reduced in size by changing the home style of Lots 8 and 9 to ramblers The retaining wall on the eastern property line of Lot 9 is approximately 80 feet long and 4 feet tall. The building pad of Lot 10 is below this wall. Top and bottom wall elevations shall be shown for this retaining wall. This wall shall be relocated outside the drainage and utility easement. The retaining wall at the comer of Lots 5 and 6 is approximately 125 feet long and 9 feet tall. The sideyard of Lot 5 and the backyard of Lot 6 are below this wall. This wall crosses the lot line and thus is on both Lot 5 and 6. Any wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA). The development plans shall call out the material of the retaining wall. The following materials are prohibited for retaining wall construction: smooth face, poured in place concrete (stamped or 1600 & 1630 Lake Lucy Road Page 3 of 8 patterned is acceptable), masonry, railroad ties and timber. Boulder walls shall not be taller than six feet. RIGHT-OF-WAY AND EASEMENTS The survey included all easements and right of way shown on the title search of the property dated November 20, 2015 from Stewart Title Guarantee Company. The applicant shall have their survey confirm this with a recent title survey before final plat. The applicant proposes a 60-foot right-of-way over Street A and 60-foot right-of-way radius over the cul-de-sac bubble. The plat maintains the existing, 66-foot right-of-way easements for Lake Lucy Road and Yosemite Avenue. Easements over drainage basins and storm water pipes shall be called out as "Drainage and Utility" easements. Three retaining walls and two entry monuments are proposed within City easements or right of way. These elements shall be relocated outside of the easement. The retaining wall on Lots 5 and 6 requires an encroachment agreement. Additional drainage and utility easement shall be granted on Lot 1 to provide 10-feet from the center of the sanitary sewer main. Per § 18-78, staff would like the applicant to examine providing future access for adjacent properties to the west, 1650 and 1670 Lake Lucy Road. Staff recommends an access easement over the north 35 feet of Lot 5 for a future private street to service Lot 5 and the future subdivided properties on existing 1650 and 1670 Lake Lucy Road. STREETS, DRIVEWAYS & SIDEWALK The applicant proposes construction of a public street, Street A. The applicant shall name this street with coordination with the Fire Marshall prior to submittal for final plat review. Street A is proposed to City standards at 31 feet wide and using the Chanhassen Standard Detail typical section. The applicant shall include the horizontal alignment tabulation for Street A in the plans. Access to the subdivision from Street A is located south of the southeastern wetland. This location was chosen after examining three locations: off of Lake Lucy Road, Yosemite Avenue north of the wetland, and Yosemite Avenue south of the wetland. The Lake Lucy Road intersection alternative was eliminated because of sight -distance concerns around the curve on Lake Lucy Road and the desire for access control on Lake Lucy Road, a Major Collector roadway. The Yosemite Avenue access north of the wetland was eliminated due to environmental concerns from running a roadway between the two wetlands across their EOF point and future maintenance concerns due to a long road extension that is surround by wetland instead of servicing properties. 1600 & 1630 Lake Lucy Road Page 4 of 8 The applicant shall apply for a variance to the requirement of 300-foot spacing between local roads per § 18-57. The access location on Yosemite, south of the wetland reviewed using engineering discretion and the guidelines set forth in the 2030 Comprehensive, the proposed intersection offset seems reasonable as the proposed 12 lot subdivision would generate less traffic than a multiple commercial driveway. The applicant's engineer completed a queuing analysis to confirm that traffic queuing to make a left tum into the proposed development would not affect the function of the Lake Lucy Road & Yosemite Avenue intersection. A street light shall be installed at the intersection of Street A and Yosemite Avenue. Driveways shall be shown on the plan in the final plat submittal. Driveways shall be designed to meet all standards in City Code §20-1122. Only one driveway access point is allowed form a single residential lot to the street. To minimize additional stormwater runoff created by long driveways required for the "flag" or "neck" lot variance, the applicant shall install a 10-foot driveway for the length of the `heck". The sidewalk within the development shall move to the south side of the street. This eliminates the need for pedestrian ramps at the intersection of Street A and Yosemite Avenue. The pedestrian ramp on the northwest comer of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. The sidewalk along Yosemite Avenue is very close to the existing utility pole. This conflict will need to be resolved by either moving the sidewalk or the utility pole and shall be shown on the plan set. UTILITIES Sanitary Sewer The applicant proposes an 8" PVC sanitary sewer main to be owned and maintained by the City, Due to the elevation of the adjacent sanitary sewer system on the east side of Yosemite, sanitary sewer for this subdivision does not meet the minimum depth required without insulation. The sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. The proposed shallow elevation of the sanitary sewer also necessitates Lot 2, 3 and 4 to use a private, in -home grinder system to pump waste to the public sanitary main which is a gravity flow system. The portion of the grinder pump services that lies within the right-of-way shall be gravity -flowing. The minimum sanitary sewer grade that the City will accept is 0.40%, therefore setting the design grade to this minimum is not advisable. The plan must have a design grade that developer and engineer are confident that the construction process will achieve the minimum of 0.40%. Sanitary sewer installed at less than 0.40% shall not be accepted by the City and must be reinstalled at the developer's expense. Staff recommends use of 0.50% minimum design grade. Per § 18-78, the applicant is required to install sanitary sewer main to the western property boundary to provide future extension to the adjacent properties: 1650 and 1670 Lake Lucy Road. It is unlikely they would be able to connect a gravity system to the sanitary main extension and The modeled design removal efficiencies were considerably greater than the values recognized by the Minnesota Stormwater Manual and other industry standards. This may be due to the limitations of the modeling software. TSS removal efficiency for a filtration device just using a sand media filter should be between 77% and 90%. The modeled removal was 97% and nearly 100%. TP removal efficiencies for the same device type should be between 28% and 5696. This is with additional WQ volume, pretreatment, etc. None of which are shown in the design. The model is indicating that between 91% and 96% of the TP will be removed using these devices on this site. Using literature review values, removals for the site in aggregate are more likely between 73% and 84% for TSS and between 27% and 41 % for TP. The applicant must achieve the 90% TSS and 60% TP removal using removal efficiencies recognized as industry standards or otherwise justifiable. WETLAND NORnt F➢itrabon B �=Lll OW O OUTFLOW T 1807%1'T INFLOW MODEL REVIEW REVIEW 'LOW (OUTFLOW LIT 3D%LIT EW REVIEW 1 608.81 2.311 60.881 121.761 2.011 0.081 1.0051 1 411 WETLAND NORTH: Bummer TSS TP OUTFLOW OUTFLOW OUTFLOW OUTFLOW OUTFLOW 60%LIT 39%UT I OUTFLOW 10%LIT 0%LIT INFLOW MODEL REVIEW REVIEW' INFLOW MODEL REVIEW REVIEW 358.61 127-791 143 44 218.75 1.66 1161 149 1.66 WETLAND EAST: F i Itraton INFLOW OUTFLOW MODEL OUTFLOW 90% UT REVIEW OUTFLOW SO% UT REVIEW INFLOW OUTFLOW MODEL OUTFLOW 50% LIT REVIEW OUTFLOW 3D% LIT REVIEW 799.53 21.13 7995 15921 2.64 023 132 1.85 TSS = 90 POND SOUTH TP=41 OUTFLOW OUTFLOW OUTFLOW 85%LIT OUTFLOW 50%LTT INFLOW MODEL REVIEW INFLOW MODEL REVIEW 25227 2622 3724 122 0,71 0.61 SITE MASS BALANCE TSS MODELED TP MODELED INFLOW OUTFLOW %REDUCTION INFLOW OUTFLOW %REDUCTION 2019.21 167.45 92% 753 2.28 70% TS5 BEST CASE TSS WORST CASE INFLOW OUTFLOW %REDUCTION INFLOW OUTFLOW %REDUCTION 201921 322.11 84% 753 4A3 41% TSS WORST CASE TP WORST CASE INFLOW OUTFLOW %REDUCTION INFLOW OUTFLOW %REDUCTION 201921 53826 73% 753 5.53 27% The applicant will explore enhanced treatment techniques such as ION Filter and pretreatment to justify greater removal efficiencies. Further, they will discontinue to model the buffer as a best management practice and will instead evaluate the construction of an additional biofiltration basin on lot 10. 3. The applicant shall prepare and submit a Surface Water Pollution Prevention Plan that contains all required elements from Parts III and IV of the NPDES/SDS Construction Permit. This shall be a standalone document. In order to review erosion prevention and sediment control practices comprehensively, a SWPPP needs to be provided. This SWPPP must be exclusive of the plan set so that it can be reviewed on its own merits. The city has modified a SWPPP review checklist developed by the PCA so that it is more specific to Chanhassen. This checklist can be made available upon request. 4. It will be required that six inches of topsoil be placed on all disturbed areas to be vegetated throughout the subject property. This shall be reflected in the grading plan, erosion plan and SWPPP. 5. The upland area between the two wetlands shall be graded to allow for a safe and stable overflow from the north wetland to the east wetland. In order for the routing to function properly, a stabilized overflow Swale will be necessary to route runoff to the east. This area shall be protected from soil losses to the wetland through erosion and shall be stabilized within 48 hours of completion of earth moving activities. The developer and the contractor shall submit a completed Landowner Statement and Contractor Responsibility form to the City. 6. Any disturbance of the buffer areas shall be restored with native vegetation appropriate to the area and the plans shall note this and the seed mix to be used. 7. All stormwater practices shall be place into a drainage and utility easement if not included in an outlot. An outlot will always be the preferred option. 8. An operations and maintenance manual shall be developed for the practices to be employed and submitted to the City. This document shall clearly indicate who is responsible for what tasks, schedule of anticipated maintenance milestones, detailed grading and planting plans including any appurtenant infrastructure. Staff is concerned about the long term viability of these biofiltration basins given their proximity to proposed house pads and potentially problematic access. The applicant will need to prepare an operations and maintenance manual for the features including inspection schedule. The applicant will need to form a Home Owners' Association to assume ownership and responsibility for the maintenance of any landscaping the HOA may wish to have. The city will assume responsibility for the underdrains, refreshing the iron filings and any storm sewer conveyance into these features. The development contract shall reflect this and a drainage and utility easement shall be recorded over all features. 9. The plans and the O&M shall clearly indicated how reasonable and access will be granted to each practice and assured throughout the life of the practice. Features that are not reasonably accessible may not be accepted by the city. 10. The development contract shall include language indicating that the Homeowners' Association shall be responsible for any landscaping work associated with the biofiltration features and the city shall maintain the associated infrastructure including the underdrain, the filtration media and the storm sewer conveyance system. 11. The wet detention pond shall be no larger in surface area or depth than is necessary. If the intent is to route the bulk of the water to the north there should be little need for a pond of this size. The depth of the pond lends to less desirable lots as the homes will walk out onto a 3:1 side slope down to the pond. 12. The wet detention pond shall be designed to have an emergency overflow skimmer outlet structure. Lake Lucy Road shall not be used as the emergency overflow and the existing RCP flared end section is cracked. 13. A detailed plan of the filtration basins, consistent with the MN Stormwater Manual shall be submitted with the final plat submittal for review and approval by city staff. It shall include, at a minimum, a plan view, a profile view, all necessary elevations, any in situ soil preparation, methodologies to be employed to protect from construction traffic, soil filter media specifications, any plantings and any appurtenant work to be done. These plans shall reflect the MN Stormwater Manual recommendations and requirements for filtration basins. These plans shall be adequate for construction to engineering specifications without confusion. It has been the city's experience that the level of detail necessary for proper construction is lacking from these plan types. 14. Underdrains and drain tile shall have tracer wire and cleanouts and a butterfly valve shall be installed on the underdrain so that the outflow can be adjusted to achieve maximum infiltration. Currently the only justification for the absence of any infiltration is the geotechnicol borings which were performed with the construction of house pads, roads, etc in mind and do not necessarily reflect the potential for infiltration throughout the site. Gulliver, et al showed that up to 1 soil boring or permeameter test may be needed per 1,000 SF. 15. Pretreatment shall be required for all filtration basins receiving piped discharge. 16. The biofiltration devices shall be designed and constructed as infiltration/filtration/recharge facilities unless it can be shown that a limitation such as less than 3 feet to ground water or bedrock is an existing condition. 17. The elevations of Lots 2 through 5 shall be raised to assure positive flow towards the street and ultimately to the treatment devices and to minimize flow to the south such that there is no increase in volume or rates leaving the site under Lake Lucy Road. It does not appear that the proposed drainage boundaries for P4, PS and P6 are reflected in the grading plan. There appears to be poor drainage in the front yards and a steeper hydraulic gradient towards the backyards of these lots in this area. This maybe further complicated by the trail moving to the south side of the cul de sac. 18. There is positive drainage towards the houses on Lots 7, 8 and 9. This is not an acceptable condition. 19. According to the grading plan, a low spot will be created on the southern lot line of lot 6 adjacent to the retaining wall. This is an unacceptable condition. 20. Storm Water Utility Connection charges due at the final plat are estimated to be $58,880.00. Many of these items have been discussed with the consulting engineers and they are working to resolve those issues. However, in the absence of a plan set showing the resolution to be practical, all comments remain germane at the time. This concludes my review. Thank you. The following is a list of my main concerns with the plan as proposed. 1. Runoff rates and volumes cannot be increased to the south. Under current conditions the southern and western 40% of the site drains to the south. It is conveyed through a culvert under Lake Lucy Road and discharges into a series of ditches, corrugated metal pipe culverts and wetlands. Water appears to overtop the drive under current conditions at the southern of the two culverts. In order to drain out of the third and final wetland, the water must bounce as much as 3 feet to leave the wetland and reach Lake Lucy. Y � 1 C ' il1�' � • � / �ry� In discussions with Roger Humphries, he suggested he would be able to address the watershed area by directing the front of lots 2 through 7 to the street and to the wetlands. It has yet to be seen how this will be accomplished. 2. The stormwater management practices shall achieve an overall reduction of at least 90% for total suspended solids and 60%for total phosphorous using industry accepted removal rates. 1600 & 1630 Lake Lucy Road Page 5 of 8 would likely require private grinder pump systems. Staff recommends locating the extension between Lots 5 and 6, however, the retaining wall would need to be removed at the time of connection to the adjacent properties at the connecting parry's expense. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. SMH 3 shall be moved outside the wheel path to the center of the road or center of the traveled lane. The sanitary services within the cul-de-sac bubble shall be revised to eliminate bends within the right-of-way. To reduce future maintenance needs for the City, SMH 1 location shall be adjusted to eliminate the need for SHM 2. The utility plan sheet shall be revised to call out the City of Chanhassen as the local authority in Note 13. Water Main The applicant proposes an 8" water main system. The plans shall call out C900 material for the water main pipe. The 90 degree bend shall be replaced with two 45 degree bends to reduce pressure on a single sharp turn of the main. The water main along Yosemite Avenue shall be shifted into the right-of-way. The sanitary sewer/water main crossing on Lot 1 may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. Two additional hydrants shall be installed, one at the intersection of Street A and Yosemite Avenue and one at Station 3+00 of Street A. TALKING POINTS FOR TUESDAY'S MEETING: / 1. The existing togopraphic survey shall show a minimum of 100 feet outside the ✓ development boundaries and include the existing first floor elevations of nearby structures. 2. Storm sewer and treatment areas shall be shown on the grading plan. 3. The applicant shall show building styles and driveways to confirm their ability to meet the 25% maximum hardcover requirement. 4. The lots shall be graded to drain away from proposed building locations. 1600 & 1630 Lake Lucy Road Page 6 of 8 5. Spot elevations shall be shown on the plans to verify that water will drain away from buildings at the following locations: Lot 6 backyard, Lot 7 backyard, the east side of Lot 1, the front yard of Lot 2. 6. Lot 9 grading shall be revised to route water away from the building pad. 7. At a minimum, the grading plan shall be revised to provide a 10-foot by 10-foot level area at all exterior egress points. 8. Lots 6-9 should be a rambler -style home, as this would fit better with the grading on surrounding properties and allow the applicant to create more effective drainage for these lots, rather than excavating down and constructing retaining walls to force a walk -out style home onto the lot. 9. The front yard grading plan shall be revised to allow a minimum of 0.5% slope on the driveways and to drain away from the proposed building pad. 10. The backyard drainage on Lot 12 shall be revised to a minimum of 2%. 11. Draintile is required for all lots where stormwater runoff will flow from the back to the front of the property. Draintile shall be shown on the plans for Lots 6, 7, 8, and 9. 12. The plan shall show EOF locations and elevation for all basins and wetlands on site. 13. All EOF shall be at least 1 foot below the lowest opening of adjacent homes. 14. The low point near the Lots 5 and 6 retaining wall and the low point on the cul-de-sac bubble shall be incorporated into the storm sewer system to drain. 15. To minimize additional stormwater runoff created by long driveways required for the "flag" or "neck" lot variance, the applicant shall install a 10-foot driveway for the length of the "neck". 16. The applicant shall identify the discharge point of the culvert shown on the existing topography near the existing driveway of 1600 Lake Lucy Road. If it is a driveway culvert, the applicant shall have it removed or bulkhead and abandoned. 17. The plans shall identify the areas intended for stockpiling materials on site during construction. 18. As the sidewalk shall be moved to the south side of Street A, the wetland retaining wall shall be minimized as much as possible. It shall be shifted out of the right-of-way. 19. The north retaining wall on Lot 9 shall be relocated outside the drainage and utility easement. This wall shall be eliminated or reduced in size by changing the home style of Lots 8 and 9 to ramblers 20. The retaining wall on the eastern property line of Lot 9 shall have top and bottom wall elevations shall be shown on the plan set. This wall shall be relocated outside the drainage and utility easement. 21. Any wall that crosses lot lines shall be owned and maintained by a Homeowners Association (HOA). 22. The development plans shall call out the material of the retaining wall. The following materials are prohibited for retaining wall construction: smooth face, poured in place concrete (stamped or patterned is acceptable), masonry, railroad ties and timber. Boulder walls shall not be taller than six feet. 23. The applicant shall have their survey confirm all easements are show on the existing topographic plan with a recent title survey before final plat. 24. Easements over drainage basins and storm water pipes shall be called out as "Drainage and Utility" easements. 25. Two entry monuments shall be relocated outside of the easement. 1600 & 1630 Lake Lucy Road Page 7 of 8 26. The retaining wall on Lots 5 and 6 requires an encroachment agreement. 27. Additional drainage and utility easement shall be granted on Lot 1 to provide 10-feet from the center of the sanitary sewer main. 28. Per § 18-78, staff would like the applicant to examine providing future access for adjacent properties to the west, 1650 and 1670 Lake Lucy Road. Staff recommends an access easement over the north 35 feet of Lot 5 for a future private street to service Lot 5 and the future subdivided properties on existing 1650 and 1670 Lake Lucy Road. 29. The applicant shall name this Street A with coordination with the Fire Marshall prior to submittal for final plat review. 30. The applicant shall include the horizontal alignment tabulation for Street A in the plans. 31. The applicant shall apply for a variance to the requirement of 300-foot spacing between local roads per § 18-57. 32. To provide future access for the properties to the west, 1650 and 1670 Lake Lucy Road, the applicant shall provide an access easement over the north 35 feet of Lot 5 for a future private street to service Lot 5 and the future subdivided properties on existing 1650 and 1670 Lake Lucy Road. 33. A street light shall be installed at the intersection of Street A and Yosemite Avenue. 34. Driveways shall be shown on the plan in the final plat submittal. 35. Driveways shall be designed to meet all standards in City Code §20-1122. 36. To minimize additional stormwater runoff created by long driveways required for the "flag" or "neck" lot variance, the applicant shall install a 10-foot driveway for the length of the "neck". 37. The pedestrian ramp on the northwest comer of the intersection of Lake Lucy Road and Yosemite Avenue shall be replaced per City of Chanhassen Standard Detail Plates. 38. The sidewalk along Yosemite Avenue is very close to the existing utility pole. This conflict will need to be resolved by either moving the sidewalk or the utility pole and shall be shown on the plan set. 39. The sanitary sewer pipe shall be insulated wherever it is less than 6 feet deep. 40. The portion of the grinder pump services that lies within the right-of-way shall be gravity -flowing. 41. Per § 18-78, the applicant is required to install sanitary sewer main to the western property boundary to provide future extension to the adjacent properties: 1650 and 1670 Lake Lucy Road. 42. The sanitary sewer/water main crossing on Lot I may be in conflict. The applicant's engineer shall verify this when the utility profiles are drafted. 43. SMH 3 shall be moved outside the wheel path to the center of the road or center of the traveled lane. 44. The sanitary services within the cul-de-sac bubble shall be revised to eliminate bends within the right-of-way. 45. To reduce future maintenance needs for the City, SMH 1 location shall be adjusted to eliminate the need for SHM 2. 46. The utility plan sheet shall be revised to call out the City of Chanhassen as the local authority in Note 13. 47. The plans shall call out C900 material for the water main pipe. 48. The 90 degree bend shall be replaced with two 45 degree bends to reduce pressure on a single sharp turn of the main. 1600 & 1630 Lake Lucy Road Page 8 of 8 49. The water main along Yosemite Avenue shall be shifted into the right-of-way. 50. Two additional hydrants shall be installed, one at the intersection of Street A and Yosemite Avenue and one at Station 3+00 of Street A. PropertySection 3: .,Information APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to the right to object at the hearings on the application or during the appeal period. If this application has not been signed by the property owner, I have attached separate documentation of full legal capacity to file the application. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Yosemite Holdings LLC Contact: Terry Forbord Address: 4960 Sussex Place Phone: (952) 470-5121 City/State/Zip: Shorewood, Minnesota 55331-9217 Cell: (612) 868-2483 Email: Terry Forbord <tforbord@forbordusa.com> Fax: Signature: Date: 4/1/16 PROPERTY OWNER: In signing this application, I, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Contact: Address: Phone: City/State/Zip: Cell: Email: Fax: Signature: Date: This application must be completed in full and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and applicable procedural requirements and fees. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. PROJECT ENGINEER (if applicable) Name: Stantec Contact: Roger L Humphrey PE Address: 2335 Highway 36 N. Frontage Road Phone: (651) 967-4652 City/State2ip: St Paul, MN 55113 Cell: (651) 706-3855 Email: Roger. Humphrey@Stantec.com Fax (651)636-1311 Section 4: Notification Information Who should receive copies of staff reports? 'Other Contact Information: ❑ Property Owner Via: ❑ Email ❑ Mailed Paper Copy Name: ❑� Applicant Via: ❑� Email ❑ Mailed Paper Copy Address: 0 Engineer Via: 0 Email ❑ Mailed Paper Copy City/State/Zip: ❑ Other' Via: ❑ Email ❑ Mailed Paper Copy Email: INSTRUCTIONS TO APPLICANT: Complete all necessary form fields, then select SAVE FORM to save a copy to your device. PRINT FORM and deliver to city along with required documents and payment SUBMIT FORM to send a digital copy to the city for processing (required). SAVE FORM PRINT FORM SUBMR FORM ADDENDUM LAKE LUCY RD. APPLICATION FOR DEVELOPMENT REVIEW COMMUNrrY DEVELOPMENT DEPARTMENT �r Cjjjjjj jjj j�{j�(\�(\7 PlanningDivision- O Market Boulevard CITY �l V 11ILJUEN Phone- g Address - P.O. Box 147. Chanhassen. hiN 55317 Phone r952?227.1300:Fax !952i227.1110 APPLICATION FOR DEVELOPMENT REVIEW PROPERTY OWNERS: In signing this application, I, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. 1 will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Almond Krueger krueger.al(a)gmaii.com 612-363-2876 Carolyn Krueger kruegercc(cDgmail.com 612-865-2570 1600 Lake Lucy Rd Excelsior, MN 55331 Date: April 2.2016 Almond Krueger uDate: April 2. 2016 CarV Krueger 1 Craig Claybaugh cmclavl(a)mchsi.com 952-250-1033 Deanna Claybaugh 1630 Lake Lucy Rd Excelsior, MN 56331-9023 �---� Date: April 2.2016 Craig Claybaugh Date: ADril2.2016 Deanna Claybaugh COMMUNITY DEVELOPMENT DEPARTMENT Planning Division — 7700 Market Boulevard CITY OF CHANNASSEN Mailing Address — P.O. Box 147, Chanhassen, MN 55317 Phone: (952) 227-1130 / Fax: (952) 227-1110 AGENCY REVIEW REQUEST LAND DEVELOPMENT PROPOSAL Please review . respond no later than the review response deadline Agency Review Request Date: Agency Review Response Deadline: Date Application Filed: April 6, 2016 Aril 21, 2016 Aril 1, 2016 Contact: Contact Phone: Contact Email: Robert Generous, AICP 952-227-1131 bgenerous@ci.chanhassen.mn.us Senior Planner Planning Commission Date: City Council Date: 60-Day Review Period Deadline: May 3, 2016 at 7:00 p.m. May 23, 2016 at 7:00 p.m. May 31, 2016 Application: Rezoning from Rural Residential District (RR) to Single -Family Residential District (RSF), and preliminary plat with variances for a 12-lot subdivision on 8.96 acres of property located at 1600 and 1630 Lake Lucy Road Planning Case: 2016-09 1 Web Page: www.ci.chanhassen.mn.us/2016-09 In order for staff to provide a complete analysis of issues for Planning Commission and City Council review, we would appreciate your comments and recommendations concerning the impact of this proposal on traffic circulation, existing and proposed future utility services, storm water drainage, and the need for acquiring public lands or easements for park sites, street extensions or improvements, and utilities. Where specific needs or problems exist, we would like to have a written report to this effect from the agency concerned so that we can make a recommendation to the Planning Commission and City Council. Your cooperation and assistance is greatly appreciated. City Departments: Federal Agencies: Adiacent Cities: ❑ Attorney ❑ Army Corps of Engineers ❑ Chaska ® Building Official ❑ US Fish & Wildlife ❑ Eden Prairie ® Engineer ❑ Jackson Township ® Fire Marshal Watershed Districts: ❑ Minnetonka ® Forester Carver CountyWMO ❑ Shorewood ® Park Director ❑ Victoria ❑ Lower MN River ® Water Resources ® Minnehaha Creek ❑ Law Enforcement Adiacent Counties: ElRiley-Purgatory-Bluff Creek ❑ Carver County Agencies: Hennepin Utilities: ❑ Scott ❑ Community Development ® Cable TV — Mediacom ❑ Engineer School Districts: El Environmental Services ❑ Electric — Minnesota Valley ® Electric — Xcel Energy ❑ Eastern Carver County 112 ❑ Historical Society El Parks ❑ Magellan Pipeline ❑ Minnetonka 276 ® Soil &Water Conservation District ® Natural Gas — CenterPoint Energy ® Phone — CenturyLink Other Agencies: State Agencies: ❑ Hennepin County Regional Railroad ❑ Board of Water & Soil Resources Authority ❑ MN Landscape Arboretum El Health ❑ H❑ SouthWest Transit Historical Society ❑ TC&W Railroad ❑ Natural Resources -Forestry ❑ Natural Resources -Hydrology ❑ Pollution Control ❑ Transportation Property Card Parcel ID Number 250033600 Taxpayer Information Taxpayer Name ALMOND L KRUEGER Mailing Address 1600 LAKE LUCY RD EXCELSIOR, MN MN 55331-9023 Property Address' 11 = Address - .. 7 1620 LAKE LUCY RD City EXCELSIOR, MN 55331 Parcel Information Uses Res 1 unit GIS Acres 0.44 Net Acres 044 Deeded Acres 0.5 Plat Lot Block Tax Description S 275' OF E 80' OF SE1/4 OF NE1/4 Building Information Building Style Above Grade Bedrooms Finished S Ft Year Built Garage N Bathrooms Miscellaneous Information M School District 0276 Watershed District WS 062 MINNEHAHA CREEK Homestead Y Green Acres N Ag Preserve N Assessor Information Estimated Market Value 2015 Values (Payable 2016) 2016 Values (Payable 2017) Last Sale Land $87,100.00 $87,100.00 Date of Sale Building $0.00 $0.00 Sale Value Total $87,100.00 $87,100.00 The data provided herewith is for reference purposes only This data is rot suitable for legat. ergmensung surveying or other similar purposes Carver County does not guarantee the accuracy of the Mormabon contained berem This data is fumebed on an as is basis and Carver County makes no representations or warranbeseither expressed or imli. for the merchantate04y or fitness of the Momerlacn provided for any purpose n s disclaimer l provided pursuant to Minnesota Statutes §4%03 and the user of the data provided terem acknowledges that Carver County shall rot he liable for any damages. and by using this data in any way expressly waives all clams. and agrees to defend xdemndy. and hold harmry less Caer Count,. its oRioials oRicers. agents employees elc from any and all clams brought by anyone who uses the information prd oved for herein its employees or agents, or CARVER third parties which arise out of user's access By acceplamos of this data the user agrees not to ransom this data or provde access to it or any part of II to another party unless the user includes COLTNTY with the data a copy of tots declaimer Wednesday, April 06, 2016 Carver County, MN d�roperty Card Parcel ID Number 250024000 taxpayer Information Taxpayer Name ALMOND L & CAROLYN C KRUEGER Mailing Address 1600 LAKE LUCY RD EXCELSIOR, MN 55331-9023 Property Address Address 1600 LAKE LUCY RD City EXCELSIOR, MN 55331 Parcel Information MMMI Uses Res 1 unit GIS Acres 3,95 Net Acres 3.95 Deeded Acres 5 0 Plat Lot Block Tax Description W 330' OF S 610' OF SW114 NW1/4 LYING W OF CENTER OF YOSEMITE RD Building Information Building Style MULTI LEVEL Above Grade 2529 Bedrooms 3 Finished S Ft Year Built 1981 Garage Y Bathrooms 2.5 Miscellaneous Information School District Watershed District Homestead Green Acres Ag Preserve 0276 WS 062 MINNEHAHA CREEK Y N N Assessor Information Estimated Market Value 2015 Values (Payable 2016) 2016 Values (Payable 2017) Last Sale Land $211,000,00 $211.000.00 Date of Sale Building $227,700.00 $224,900.00 Sale Value Total $438, 700.00 $435, 900, 00 late prov cIm he - e�oe purposes only This data is rot suitable for legat. eogmeenng surveying or other similar purposes Caner County does not guarantee the accuracy of the .matron contanec :..a is furnished on an as is basis and Carver County makes no representations or warranties. either expressed or implied for the merchantabilpy or fitness of the ormatiad provided, for a v, p This disclaimer a provided pursuant to Minnesota Statutes §466 03 and the user of the data provided terein acWwwledges that Carver County shall not he table for any damages. and by using this data in any way expressly wanes all claims and agrees to defend, ricemnily, and hold G harmless Carver County. As ofboals. officersagentsemployeesetc from any and all clarms brought by anyone who uses the information provided for herein As employees or agents. or CARVER third parties which arise out of users access By acceptance of this datathe user agrees not to transmit this data of provide access to it or any pad of ,t to another party unless the user crcEMes COL JNTy with line data a copy of this disclaimer Wednesday, April 06, 2016 Carver County, MN Property Card Parcel ID Number 250033700 Taxpayer Information I Taxpayer Name CRAIG & DEANNA CLAYBAUGH 3 m 0 Mailing Address 1630 LAKE LUCY RD PHEASANT HILL PARK EXCELSIOR, MN 55331-9023 Property Address Address 1630 LAKE LUCY RD City EXCELSIOR, MN 55331 Lake Cucy Rd o Parcel Information Uses Res 1 unit GIS Acres 3.68 Net Acres 3.68 Deeded Acres 40 Plat Lot Block Tax Description P/O SE1/4 NE1/4 DESC AS BEG AT A PT ON S LINE SE1/4 NE1/4 80' W OF SE CORN TH CONT WON S Building Information Building Style 1 STORY Above Grade 1257 Bedrooms 2 Finished S Ft Year Built 1961 Garage Y Bathrooms 275 Miscellaneous Information School District Watershed District Homestead Green Acres Ag Preserve 0276 WS 062 MINNEHAHA CREEK Y N N Assessor Information Estimated Market Value 2015 Values 2016 Values Last Sale (Payable 2016) (Payable 2017) Land $186,300.00 $186,300.00 Date of Sale 04/02/1997 Building $175,000.00 $172,900.00 Sale Value $206,250.00 Total $361, 300.00 $359,200.00 The data provided hereeith is for reference purposes only. This data is rot suitable for legal, engineeringsurveying a other similar purposes. Carver County does hot guarantee the accuracy of the intormal contained herein This data is furnished on an as s basis and Carver County makes no representations or warranties, either expressed or implied, for the merchantability or fMess of the information provided for any purpose. This disclaimer a provided pursuant to Minnesota Statutes §466.03 and the user of the data provided herein acknowtedges that Carver County shall not be liable for any damagesand by using this data in any way expressly wanes all claims, and agrees to defend indemnify. and hdtl harmless Carver County, its officalsofficersagents, employees, etcfrom any and all claims brought by anyone who uses the information provided for hereiin. its employees or agents. or CARVER third parties which arise out of users access. By acceptance of this datathe user agrees not to transmit this data or provide access to it a any part of it to another party unless the user includes COUNTY with the data a copy of this disclaimer Wednesday, April 06, 2016 Carver County, MN Yosemite Holdings LLC March 31, 2016 Mr. Bob Generous Senior Planner City of Chanhassen 7700 Market Blvd. Chanhassen, MN 55317 Subject: Application Fee for Lake Lucy Rd. Preliminary Plat. Dear Bob, Enclosed you'll find the application fee for the Preliminary Plat which we will formally be submitting Friday, April 1, 2016. We look forward to working with you and the City of Chanhassen. Sincerely, Terry Forbord Yosemite Holdings LLC 4960 Sussex Place Shorewood, Minnesota 55331-9217 Office: (952) 470-5121 Cell: (612) 868-2483 tforbord0forbordusa.com 4960 Sussex Place, Shorewood, MN 553311 Office: 952-470-5121 1 Cell: 612-868-2483 t fo rb o r d 0 fo r b o rd u sa. c o m CITY OF CHANHASSEN P O BOX 147 CHANHASSEN MN 55317 04/06/2016 2:38 PM Receipt No. 00312055 CLERK: AshleyM PAYEE: Yosemite Holdings LLC 245 W Point Road Excelsior MN 55331- Lake Lucy Road- Planning Case 2016-09 ------------------------------------------------------- Subdivision 780.00 Sign Rent 200.00 Rezoning Fees 500.00 Variance 200.00 GIS List 141.00 Total Cash Check 4000 Change 1,821.00 0.00 1,821.00 0.00 Company LLC Forbord Land ...Management �ytlon �pital5w 6,*er4e • Conwlting Nninen`ems Myetc ° bOrd 55331 Shorewood, MN president 4960 sussex 52) 470-5121 ire: 19521 Cell: (61212483 tforwd@forbordusa.com LAKE LUCY ROAD - PLANNING CASE 2016-09 $500.00 Rezoning $600.00 Subdivision (over 3 lots) $180.00 $15 per lot (12 lots) $200.00 Variance $200.00 Notification Sign $141.00 Property Owners List (47 addresses x $3 each) $1,821.00 TOTAL $1,821.00 Check 4000 from Yosemite Holdings, LLC $0.00 BALANCE OWED Drainage Report Lake Lucy Road ® Stantec Prepared for: Yosemite Holdings, INC Prepared by: Peter Allen April 1, 2016 Stantec Consulting Ltd. CITY OF CHANHASSEN RECEIVED APR U "1 2016 CHANHASSEN PANNING OEPT DRAINAGE REPORT Apnl 1, 2016 A drainage analysis was completed for the proposed Lake Lucy Road project located northwest of the intersection of Lake Lucy Road and Yosemite Ave in Chanhassen, Minnesota. The proposed development will included 12 single family home lots with a new roadway and utilities. The following is a summary of the stormwater analysis completed for this development. Summary of Site Drainage Existing Conditions Under the existing conditions, the 9.0 arce site, which has a total drainage area of approximately 13.5 acres, is divided by a natural ridge that cuts the site approximately in half. This divide is also the hydrologic boundary between Minnehaha Creek Watershed District (MCWD) to the north and Riley Purgatory Bluff Creek Watershed District (RPBCWD) to the south. The north half of the site drains to two existing wetlands. These wetlands are connected by an overland spillway. Approximately 4 acres from off -site land to the north drains to the north wetland. The south half of the site drains to an existing culvert that flows to the south across Lake Lucy Road. The site is primarily wooded with 3 single family homes located on the southern side of the site. Proposed Conditions Proposed conditions will include the construction of 12 single family homes, a new roadway, and new utilities. The general drainage patterns will remain with the northern portion of the site draining to the two wetlands and the southern portion of the site draining to a proposed wet detention pond to the south. Runoff from the roadway will be treated by two filtration basins. The majority of pervious surfaces of the site will be turf, with the northwest corner being kept as woods. An emergency outflow pipe will be placed at the south end of Wetland East to provide additional outflow capacity during storm events that exceed the 100-yr, 24-hr event. Design Criteria Criteria and assumptions made for this analysis: • Peak runoff rates not to increase for the 2-, 10-, and 100-yr, 24-hr storm events. • Rainfall depths assuming TP-40 were used for this analysis with Type II rainfall distribution. Rainfall Event Rainfall Depth (in) 2-yr 2.8 10-yr 4.2 100-yr 6.0 • Minimum time of concentration was assumed to be 6 minutes. • Water quality requirement must meet NURP criteria (90%Total Suspended Solids (TSS) removal and 60%Total Phosphorus (TP) removal) ® Stantec OP v:\1938\active\193903412\de gn\stormwater\1604-0i sub ffl.1\193BW412 drainage-memo-160401.do x t DRAINAGE REPORT April 1, 2016 • Infiltration: Due to the presence of Hydrologic Soil Group (HSG) Type D soils, infiltration is not recommended for this site. • Wetlands: Meet the wetland requirements for bounce and inundation period for Manage 1 and Manage 2 wetland classifications. Peak Rate Control The following table summarizes the peak flow rates for each drainage area for the 2, 10, and 100-yr, 24-hr storm events under existing and proposed conditions. Based on the analysis the proposed stormwater management meets the City's requirements for peak rate control. Refer to the attached drainage area map and HydroCAD output information for further details. Rate Control Summary 2-year I 10-year 100-year Condition (cfs) (cfs) :is) To South 5.4 9.7 13.5 Existing Conditions I To West j 0.4 0.8 1.4 To South 3.0 6.7 9-7 Proposed Conditions I To West 0.0 0.0 0.0 Volume Control The soils on site consist of primarily sandy clays and clayey sands. These soils don't provide good infiltration rates: therefore, infiltration is considered an inappropriate form of stormwater management. In place of infiltration features, filtration features will be used to treat stormwater prior to discharging offsite. Water Quality Since infiltration is not feasible on the site, NURP water quality standards (90%TSS removal and 60% TP removal) were met. To achieve these standards, filtration basins and natural turf buffers were used. The software modeling program P8 was used to perform the necessary water quality calculations. NURP standards were achieved for each outfall location; wetland north, wetland east, and the pond outlet. A separate analysis was conducted for each outfall. Drainage areas for each outfall included some portions from offsite areas and undisturbed on -site areas. These areas were included in the analysis, but sediment loadings were removed to appropriately analyze the land disturbance drainage. Below is a summary of each outfall. Stantec apv:\1938\active\193803412\de gn\sto waler\1604-01 submitta1\193803412dramge-me 160401do x 2 DRAINAGE REPORT April I, 2016 Wetland North The Wetland North receives flow from the northwest and north central portions of the site as well as approximately 4 acres of offsite flow. Onsite drainage area includes roadway, housing lots, and turf surfaces. The roadway and a portion of the lots will be routed to a 1.5-ft deep filtration basin with a draintile underdrain for treatment prior to discharging to the wetland. The remainder of the Wetland North drainage area flows overland (or turf buffer areas) prior to discharging to the wetland. Wetland East The Wetland East receives flow from a small area of on-site/disturbed area are form the west with the majority of the drainage area being from offsite/undisturbed areas. The on -site drainage area primarily includes a portion of residential lot area and a small amount of new sidewalk. The primary stormwater treatment features will consist of a turf buffer area and a small 1-ft high filtration berm that runs along the perimeter of the wetland. South The South outfall receive flow from southern portion of the site include the east portion of the proposed roadway. The runoff from the roadway is routed to a 1.0-ft deep filtration basin with a draintile underdrain for pretreatment prior to discharging into the wet detention pond. The wet detention pond includes a 5-ft deep permanent pool to provide water quality treatment prior to discharging off site. Below is a summary of the TSS and TP removal efficiencies. Based on the analysis the proposed stormwater management meets the City's requirements for water quality treatment. More information can be found in the attached P8 output data. Water Quality Summary outfall TSS Removal Efficiency (%) TP Removal Efficiency (%) Wetland North 90.3 62.0 Wetland East 94.3 76.3 South 95.9 76.8 Wetlands The general understanding of how the wetlands function under existing conditions is that Wetland East overflows into Wetland North through the natural spillway at an elevation of 1006.6. and then Wetland North discharges at an unknown rate to the east through an outlet pipe at the northeast corner of Wetland North. The functionality of this outlet pipe is currently unknown ® Stantec apv:\1938\active\193803412\design\stormwater\1604-01 submitta1\193803412 drainage_ memo_160401.docx DRAINAGE REPORT April I, 2016 and therefore is not included in the HydroCAD modeling. The two wetlands onsite are classified as Manage 1 (Wetland East) and Manage 2 (Wetland North). These types of wetlands have specific bounce and inundation period required based on the Recommended Wetland Management Classification System that accompanies the Minnesota Routine Assessment Method (MnRAM) Evaluating Wetland Function that are summarized in the table below. Wetland Permitted Inundation Inundation Management Bounce for 10-yr Period for 1-year Period for 10-yr Runout Control Classification Event & 2-year Event Event Elevation Manage 1 Existing + 0.5 it Existing + 1 day Existing + 7 days No Change 0 to 1.0 ft aboveexisting Manage 2 Existing + 1.0 itExisting + 2 days Existing + 14 days runout An inundation period analysis would not be accurate due to the unknown nature of the existing outlet pipe, therefore, bounce and runout control elevation criteria are the only requirement that were analyzed. The outlet elevation of Wetland East cannot be lowered; therefore an emergency outlet pipe was place at an elevation of 1006.7 which is above the existing overland spillway elevation. This emergency outlet will help alleviate flooding potential of the wetland areas during larger storm events (e.g. greater than 100-yr event). The table below summarizes the wetland analysis. More information can be found in the attached HydroCAD output files. Weiland Summary 10-year HWL Runout Control Elevation Wetland Condition (feet) (feet) Existing Conditions 1005.92 1006.6 Proposed Conditions 1006.15 1006.6 Wetland North (Manage 2) Existing Conditions 1004.84 1006.6 1004.43 1006.6 Wetland East (Manage 1) Proposed Conditions Attachments: Proposed Drainage Area Map HydroCAD Output P8 Output ® Stantec ap v:\1938\active\193803412\design\sto titer\1&0"1 submi"01\193803412_drdnOge_memp_I60401-d cx � I - r - - \ 05-3 I I � I I i eA IIAoirNOP-H- 1`I� I i DRAINAGE AREAS DA ID AREA (AQ I MPERVIOUS (AQ E-1 3.70 0.14 E-2 1.66 0.22 E-3 2.93 0.0 E-4 6.23 0.0 OSI 0.91 0.33 OS-3 4.00 0.18 TOTAL 13,51 0.8] E-4 I1yIfA IIII L./rasr y , , E2--- 7`T J I q E-(i , C_ >< 6 ILV _ w- _ _ _ N ---• — EXISTING DRAINAGE AREAS YOSEMITE HOLDINGS LLC FIGURE 1 ®StanteC LAKE LUCY ROAD DATE: 04/01MI6 PROD. NO.: 193DON 12 " DRAINAGE AREAS DA ID AREA (AQ IMPERVIOUS (AQ P-1 2A5 0.69 P-2 1.18 0.26 P-3 2.88 0.55 P-4 0.56 0.33 P-5 0.21 0.08 P-6 0.68 0.35 P-7 0.61 0.18 OS-1 0.94 0.33 OS-3 4.00 0.18 TOTAL 13.51 2.95 PROPOSED DRAINAGE AREAS YOSEMITE HOLDINGS LLC FIGURE 2 LAKE LUCY ROAD ® Stantec ontP. 04/0 V201t RROI, NO: 193BD3/12 ....,,,,r..� HYDROCAD OUTPUT r 9S os- 7P / Wetland Nc E-3 \ , 01 YJ 5P ro Off -site Subca Reach Ao Llnk Existing Culvert We and East 2S E-02 193803412_Existing_160322 Prepared by Stantec Consulting Ltd. HydroCAD® 10.00-15 s/n 00429 © 2015 HydroCAD Software Solutic Type/1 24-hr 2-yr Rainfall=2.80" Printed 3/31/2016 Summary for Subcatchment 1S: E-01 Runoff = 4.30 cfs @ 12.15 hrs, Volume= 0.340 af, Depth= 1.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Description 2.370 80 >75% Grass cover, Good, HSG D 1.190 79 Woods/grass comb., Good, HSG D 0.140 98 Paved parking HSG D 3.700 80 Weighted Average 3.560 96.22% Pervious Area 0.140 3.78% Impervious Area Tc Length Slope Velocity Capacity Description 16.7 165 0.1200 0.16 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 4.2 305 0.0590 1.21 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 20.9 470 Total Summary for Subcatchment 2S: E-02 Runoff = 3.31 cfs @ 12.03 hrs, Volume= 0.187 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Description 1.220 79 Woods/grass comb., Good, HSG D 0.220 98 Paved roads w/curbs & sewers, HSG D 0.220 98 Water Surface 0% imp. HSG D 1.660 84 Weighted Average 1.440 86.75% Pervious Area 0.220 13.25% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (f /ft) (f /sec) (cfs) 8.0 60 0.1000 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 2.8 215 0.0650 1.27 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 10.8 275 Total 193803412 Existing_160322 Prepared by Stantec Consulting Ltd. HydroCAM 10.00-15 s/n 00429 ©2015 Type // 24-hr 2-yr Rainfall=2.80" Printed 3/31/2016 Summary for Subcatchment 3S: E-3 Runoff = 4.32 cfs @ 12.14 hrs, Volume= 0.336 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Description 0.600 80 >75% Grass cover, Good, HSG D 1.620 79 Woods/grass comb., Good, HSG D 2.980 84 Weighted Average 2.980 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.8 180 0.1220 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 3.2 175 0.0340 0.92 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.0 355 Total Summary for Subcatchment 4S: E-04 Runoff = 0.42 cfs @ 11.99 hrs, Volume= 0.021 af, Depth= 1.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Description 0.230 80 >75% Grass cover, Good, HSG D 0.230 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.6 110 0.0545 0.24 Sheet Flow, Grass: Short n= 0.150 P2= 2.80" Summary for Subcatchment 9S: OS-3 Runoff = 4.64 cfs @ 12.15 hrs, Volume= 0.367 af, Depth= 1.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type 11 24-hr 2-yr Rainfall=2.80" 193803412_Existing_160322 Prepared by Stantec Consulting Ltd. HvdroCAD(D 10,00-15 s/n 00429 n 2015 1 Type 1124-hr 2-yr Rainfall=2.80" Printed 3/31/2016 Area (ac) CN Description 3.820 79 Woods/grass comb., Good, HSG D 0.180 98 Paved parking HSG D 4.000 80 Weighted Average 3.820 95.50% Pervious Area 0.180 4.50% Impervious Area Tc Length Slope Velocity Capacity Description _(min) (feet) (ft/ft) (ft/sec) (cfs) 17.8 180 0.1220 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 3.2 175 0.0340 0.92 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.0 355 Total Summary for Subcatchment 10S: OS-1 Runoff = 1.30 cfs @ 12.21 hrs, Volume= 0.117 af, Depth= 1.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Description 0.610 79 Woods/grass comb., Good, HSG D 0.330 98 Paved roads w/curbs & sewers, HSG D 0.940 86 Weighted Average 0.610 64.89% Pervious Area 0.330 35.11 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.9 250 0.0840 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 0.1 15 0.1300 1.80 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 27.0 265 Total Summary for Reach 8R: Off -site Inflow Area = 4.870 ac, 9.65% Impervious, Inflow Depth = 1.18" for 2-yr event Inflow = 5.47 cfs @ 12.19 hrs, Volume= 0.478 of Outflow = 5.47 cfs @ 12.19 hrs, Volume= 0.478 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs 193803412 Existing_160322 Type/1 24-hr 2-yr Rainfall=2.80" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD®10.00-15 s/n 00429 © 2015 HydroCAD Software Solutions LLC Page 5 Summary for Pond 5P: Existing Culvert Inflow Area = 4.640 ac, 10.13% Impervious, Inflow Depth = 1.18" for 2-yr event Inflow = 5.54 cfs @ 12.16 hrs, Volume= 0.457 of Outflow = 5.38 cfs @ 12.20 hrs, Volume= 0.457 af, Atten= 3%, Lag= 2.3 min Primary = 5.38 cfs @ 12.20 hrs, Volume= 0.457 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 994.65' @ 12.20 hrs Surf.Area= 1,055 sf Storage= 403 cf Plug -Flow detention time= 0.4 min calculated for 0.456 of (100% of inflow) Center -of -Mass det. time= 0.4 min ( 856.8 - 856.4 ) Volume Invert Avail.Storage Storage Description #1 994.00' 14,709 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 994.00 186 0 0 996.00 2,860 3,046 3,046 998.00 8,803 11,663 14,709 Invert Outlet Devices #1 Primary 993.49' 18.0" Round Culvert L= 23.0' Ke= 0.500 Inlet / Outlet Invert= 993.49' / 992.88' S= 0.0265'P Cc= 0.900 n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max=5.36 cfs @ 12.20 hrs HW=994.65' (Free Discharge) t1=Culvert (Inlet Controls 5.36 cfs @ 3.66 fps) Summary for Pond 6P: Wetland East Inflow Area = 8.640 ac, 4.63% Impervious, Inflow Depth = 0.26" for 2-yr event Inflow = 3.31 cfs @ 12.03 hrs, Volume= 0.187 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,003.94' @ 24.65 hrs Surf.Area= 6,485 sf Storage= 8,154 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 1,002.00' 68,938 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation (feet) Surf.Area (sq-ft) Inc.Store (cubic -feet) Cum.Store (cubic -feet) 1,002.00 1,907 0 0 1,004.00 6,618 8,525 8,525 1,006.00 13,714 20,332 28,857 1,008.00 26,367 40,081 68,938 193803412 Existing_160322 Type // 24-hr 2-yr Rainfall=2.80" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCADO 10.00-15 s/n 00429 02015 HydroCAD Software Solutions LLC Page 6 Summary for Pond 7P: Wetland North Inflow Area = 6.980 ac, 2.58% Impervious, Inflow Depth = 1.21" for 2-yr event Inflow = 8.96 cfs @ 12.15 hrs, Volume= 0.703 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,005.20' @ 25.25 hrs Surf.Area= 34,467 sf Storage= 30,642 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 1,004.00' 188,161 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,004.00 16,694 0 0 1,006.00 46,368 63,062 63,062 1,008.00 78,731 125,099 188,161 Device Routing Invert Outlet Devices #1 Primary 1,006.60' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,004.00' (Free Discharge) t1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 193803412 Existing_160322 Type 1124-hr 10-yr Rainfall=4.20" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD®10.00-15 s/n 00429 02015 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1S: E-01 Runoff = 8.81 cfs @ 12.14 hrs, Volume= 0.681 af, Depth= 2.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN Description 2.370 80 >75% Grass cover, Good, HSG D 1.190 79 Woods/grass comb., Good, HSG D 0.140 98 Paved parking HSG D 3.700 80 Weighted Average 3.560 96.22% Pervious Area 0.140 3.78% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.7 165 0.1200 0.16 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 4.2 305 0.0590 1.21 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 20.9 470 Total Summary for Subcatchment 2S: E-02 Runoff = 6.17 cfs @ 12.02 hrs, Volume= 0.352 af, Depth= 2.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN Description 1.220 79 Woods/grass comb., Good, HSG D 0.220 98 Paved roads w/curbs & sewers, HSG D 0,220 98 Water Surface 0% imp HSG D 1.660 84 Weighted Average 1.440 86.75% Pervious Area 0.220 13.25% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.0 60 0.1000 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 2.8 215 0.0650 1.27 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 10.8 275 Total 193803412 Existing_160322 Prepared by Stantec Consulting Ltd. HydroCAD®10.00-15 s/n 00429 0 2015 1 Type 1124-hr 10-yr Rainfall=4.20" Printed 3/31/2016 Summary for Subcatchment 3S: E-3 Runoff = 8.17 cfs @ 12.14 hrs, Volume= 0.633 af, Depth= 2.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0,00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN Description 0.600 80 >75% Grass cover, Good, HSG D 1.620 79 Woods/grass comb., Good, HSG D 0.760 98 Water Surface 0% imp HSG D 2.980 84 Weighted Average 2.980 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.8 180 0.1220 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 3.2 175 0.0340 0.92 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 21.0 355 Total Summary for Subcatchment 4S: E-04 Runoff = 0.84 cfs @ 11.99 hrs, Volume= 0.042 af, Depth= 2.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN Description 0.230 80 >75% Grass cover, Good, HSG D 0,230 100.00% Pervious Area Tc Length Slope Velocity Capacity Description 7.6 110 0.0545 0.24 Sheet Flow, Grass: Short n= 0.150 P2= 2.80" Summary for Subcatchment 9S: OS-3 Runoff = 9.50 cfs @ 12.14 hrs, Volume= 0.736 af, Depth= 2.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type 11 24-hr 10-yr Rainfall=4.20" 193803412_Existing_160322 Prepared by Stantec Consulting Ltd. HydroCAD® 10.00-15 s/n 00429 © 2015 1 Area (ac) CN Description 3.820 79 Woods/grass comb., Good, HSG D 0.180 98 Paved oarkina. HSG D 4.000 80 Weighted Average 3.820 95.50% Pervious Area 0.180 4.50% Impervious Area Tc Length Slope Velocity Capacity Description Type 1124-hr 10-yr Rainfall=4.20" Printed 3/31/2016 17.8 180 0.1220 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 3.2 175 0.0340 0.92 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.0 355 Total Summary for Subcatchment 10S: OS-1 Runoff = 2.37 cfs @ 12.20 hrs, Volume= 0.214 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN Description 0.610 79 Woods/grass comb., Good, HSG D 0.330 98 Paved roads w/curbs & sewers. HSG D 0,940 86 Weighted Average 0.610 64.89% Pervious Area 0.330 35.11% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.9 250 0.0840 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 0.1 15 0.1300 1.80 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 27.0 265 Total Summary for Reach 8R: Off -site Inflow Area = 4.870 ac, 9.65% Impervious, Inflow Depth = 2.31" for 10-yr event Inflow = 9.80 cfs @ 12.23 hrs, Volume= 0.937 of Outflow = 9.80 cfs @ 12.23 hrs, Volume= 0.937 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs 193803412 Existing_160322 Prepared by Stantec Consulting Ltd. HydroCAD@ 10.00-15 s/n 00429 @ 2015 1 Solutions LLC Type 1124-hr 10-yr Rainfall=4.20" Printed 3/31/2016 Summary for Pond 5P: Existing Culvert Inflow Area = 4.640 ac, 10.13% Impervious, Inflow Depth = 2.31" for 10-yr event Inflow = 11.06 cfs @ 12.15 hrs, Volume= 0.895 of Outflow = 9.66 cfs @ 12.24 hrs, Volume= 0.895 af, Atten= 13%, Lag= 5.2 min Primary = 9.66 cfs @ 12.24 hrs, Volume= 0.895 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 995.53' @ 12.24 hrs Surf.Area= 2,230 sf Storage= 1,847 cf Plug -Flow detention time= 1.1 min calculated for 0.894 of (100% of inflow) Center -of -Mass det. time= 1.1 min ( 838.3 - 837.2 ) Volume Invert Avail.Storage Storage Description #1 994.00' 14,709 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 994.00 186 0 0 996.00 2,860 3,046 3,046 998.00 8,803 11,663 14,709 Device Routing Invert Outlet Devices #1 Primary 993.49' 18.0" Round Culvert L= 23.0' Ke= 0.500 Inlet / Outlet Invert= 993.49' / 992.88' S= 0.0265 '/' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max=9.62 cfs @ 12.24 hrs HW=995.52' (Free Discharge) L1=Culvert (Inlet Controls 9.62 cfs @ 5.45 fps) Summary for Pond 6P: Wetland East Inflow Area = 8.640 ac, 4.63% Impervious, Inflow Depth = 0.49" for 10-yr event Inflow = 6.17 cfs @ 12.02 hrs, Volume= 0.352 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,004.84' @ 24.65 hrs Surf.Area= 9,605 sf Storage= 15,353 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 1,002.00' 68,938 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation (feet) Surf.Area (sq-ft) Inc.Store (cubic -feet) Cum.Store (cubic -feet) 1,002.00 1,907 0 0 1,004.00 6,618 8,525 8,525 1,006.00 13,714 20,332 28,857 1,008.00 26,367 40,081 68,938 193803412 Existing_160322 Prepared by Stantec Consulting Ltd. Type // 24-hr 10-yr Rainfall=4.20" Printed 3/31/2016 Summary for Pond 7P: Wetland North Inflow Area = 6.980 ac, 2.58% Impervious, Inflow Depth = 2,35" for 10-yr event Inflow = 17.67 cfs @ 12.14 hrs, Volume= 1.369 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,005.92' @ 25.25 hrs Surf.Area= 45,255 sf Storage= 59,624 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 1,004.00' 188,161 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,004.00 16,694 0 0 1,006.00 46,368 63,062 63,062 1.008.00 78,731 125,099 188,161 Device Routing Invert Outlet Devices #1 Primary 1,006.60' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,004.00' (Free Discharge) t1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 193803412 Existing_160322 Type II 24-hr 100-yr Rainfall=6.00" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCADO 10.00-15 s/n 00429 @ 2015 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 1S: E-01 Runoff = 15.05 cfs @ 12.14 hrs, Volume= 1.166 af, Depth= 3.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN Descriotion 2.370 80 >75% Grass cover, Good, HSG D 1.190 79 Woods/grass comb., Good, HSG D 0.140 98 Paved parking HSG D 3.700 80 Weighted Average 3.560 96.22% Pervious Area 0.140 3.78% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (fUft) (ft/sec) (cfs) 16.7 165 0.1200 0.16 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 4.2 305 0.0590 1.21 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 20.9 470 Total Summary for Subcatchment 2S: E-02 Runoff = 9.97 cfs @ 12.02 hrs, Volume= 0.581 af, Depth= 4.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN Descriotion 1.220 79 Woods/grass comb., Good, HSG D 0.220 98 Paved roads w/curbs & sewers, HSG D 0.220 98 Water Surface 0% imp, HSG D 1.660 84 Weighted Average 1.440 86.75% Pervious Area 0.220 13.25% Impervious Area Tc Length Slope Velocity Capacity Description &0 60 0.1000 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 2.8 215 0.0650 1.27 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 10.8 275 Total 193803412_Existing_160322 Type 1124-hr 100-yrRainfall=6.00" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD0 10.00-15 s/n 00429 02015 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 3S: E-3 Runoff = 13.29 cfs @ 12.13 hrs, Volume= 1.042 af, Depth= 4.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN Description 0.600 80 >75% Grass cover, Good, HSG D 1.620 79 Woods/grass comb., Good, HSG D 0.760 98 Water Surface 0% imp, HSG D 2.980 84 Weighted Average 2.980 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.8 180 0.1220 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 3.2 175 0.0340 0.92 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.0 355 Total Summary for Subcatchment 4S: E-04 Runoff = 1.42 cfs @ 11.99 hrs, Volume= 0.072 af, Depth= 3.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN Description 0.230 80 >75% Grass cover, Good, HSG D 0.230 100.00% Pervious Area Tc Length Slope Velocity Capacity Description 7.6 110 0.0545 0.24 Sheet Flow, Grass: Short n= 0.150 P2= 2.80" Summary for Subcatchment 9S: OS-3 Runoff = 16.23 cfs @ 12.14 hrs, Volume= 1.260 af, Depth= 3.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type 11 24-hr 100-yr Rainfall=6.00" 193803412 Existing_160322 Type If 24-hr 100-yr Rainfall=6.00" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCADO 10.00-15 sin 00429 © 2015 HvdroCAD Software Solutions LLC Page 14 Area (ac) CN Description 3.820 79 Woods/grass comb., Good, HSG D 0.180 98 Paved oarkina. HSG D 4.000 80 Weighted Average 3.820 95.50% Pervious Area 0.180 4.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.8 180 0.1220 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 3.2 175 0.0340 0.92 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 21.0 355 Total Summary for Subcatchment 10S: OS-1 Runoff = 3.78 cfs @ 12.20 hrs, Volume= 0.345 af, Depth= 4.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN Description 0.610 79 Woods/grass comb., Good, HSG D 0.330 98 Paved roads w/curbs & sewers, HSG D 0.940 86 Weighted Average 0.610 64.89% Pervious Area 0.330 35.11% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.9 250 0.0840 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 0.1 15 0.1300 1.80 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 27.0 265 Total Summary for Reach 8R: Off -site Inflow Area = 4.870 ac, 9.65% Impervious, Inflow Depth = 3.90" for 100-yr event Inflow = 13.67 cfs @ 12.28 hrs, Volume= 1.584 of Outflow = 13.67 cfs @ 12.28 hrs, Volume= 1.584 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs 193803412 Existing_160322 Type 1124-hr 100-yrRainfall=6.00" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAM 10.00-15 s/n 00429 © 2015 HydroCAD Software Solutions LLC Pape 15 Summary for Pond 5P: Existing Culvert Inflow Area = 4.640 ac, 10.13% Impervious, Inflow Depth = 3.91" for 100-yr event Inflow = 18.64 cfs @ 12.15 hrs, Volume= 1.511 of Outflow = 13.47 cfs @ 12.29 hrs, Volume= 1.511 af, Atten= 28%, Lag= 8.7 min Primary = 13.47 cfs @ 12.29 hrs, Volume= 1.511 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 996.74' @ 12.29 hrs Surf.Area= 5,074 sf Storage= 6,001 cf Plug -Flow detention time= 2.5 min calculated for 1.510 of (100% of inflow) Center -of -Mass det. time= 2.5 min ( 824.9 - 822.4 ) Volume Invert Avail.Storage Storage Description #1 994.00' 14.709 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 994.00 186 0 0 996.00 2,860 3,046 3,046 998.00 8,803 11,663 14,709 Device Routing Invert Outlet Devices #1 Primary 993.49' 18.0" Round Culvert L= 23.0' Ke= 0.500 Inlet / Outlet Invert= 993.49' / 992.88' S= 0.0265'P Cc= 0.900 n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max=13.45 cfs @ 12.29 hrs HW=996.74' (Free Discharge) L1=Culvert (Inlet Controls 13.45 cfs @ 7.61 fps) Summary for Pond 6P: Wetland East Inflow Area = 8.640 ac, 4.63% Impervious, Inflow Depth = 1.01" for 100-yr event Inflow = 9.97 cfs @ 12.02 hrs, Volume= 0.730 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,006.20' @ 72.00 hrs Surf.Area= 15,006 sf Storage= 31,790 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 1,002.00' 68,938 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,002.00 1,907 0 0 1,004.00 6,618 8,525 8,525 1,006.00 13,714 20,332 28,857 1,008.00 26,367 40,081 68,938 193803412 Existing_160322 Prepared by Stantec Consulting Ltd. HydroCADV 10.00-15 s/n 00429 ©2015 1 Solutions LLC Type 1124-hr 100-yr Rainfall=6.00" Printed 3/31/2016 Summary for Pond 7P: Wetland North Inflow Area = 6.980 ac, 2.58% Impervious, Inflow Depth = 3.96" for 100-yr event Inflow = 29.53 cfs @ 12.14 hrs, Volume= 2.303 of Outflow = 0.37 cfs @ 24.17 hrs, Volume= 0.149 af, Atten= 99%, Lag= 722.3 min Primary = 0.37 cfs @ 24.17 hrs, Volume= 0.149 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,006.66' @ 24.17 hrs Surf.Area= 57,025 sf Storage= 97,108 cf Plug -Flow detention time= 924.8 min calculated for 0.149 of (6% of inflow) Center -of -Mass det. time= 692.5 min ( 1,512.7 - 820.1 ) Volume Invert Avail.Storage Storage Description #1 1,004.00' 188.161 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,004.00 16,694 0 0 1,006.00 46,368 63,062 63,062 1,008.00 78,731 125,099 188,161 Device Routing Invert Outlet Devices #1 Primary 1,006.60' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.35 cfs @ 24.17 hrs HW=1,006.66' (Free Discharge) t1=Broad-Crested Rectangular Weir (Weir Controls 0.35 cfs @ 0.60 fps) OS- 3S Ap P-3 Aetland North 6P S Wetland East P-6 �s P-2 Filtration Basin 1S OP-1 10S OS-1 5P South Pond FlOR South Subca Reach and Link sin r / P-4 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. HydroCAD®10.00-15 s/n 00429 © 2015 HydroCAD Software Solutioi Type 1124-hr 2-yr Rainfall=2.80" Printed 3/31/2016 Summary for Subcatchment 1S: P-1 Runoff = 6.56 cfs @ 11.97 hrs, Volume= 0.320 af, Depth= 1.57' Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Description 2.310 86 1/3 acre lots, 30% imp, HSG D 0.140 98 Water Surface 0% imp HSG D 2.450 87 Weighted Average 1.757 82 71.71 % Pervious Area 0.693 98 28.29% Impervious Area Tc Length Description 4.3 60 0.1670 0.23 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 1.5 377 0.0693 4.24 Shallow Concentrated Flow, Unpaved Kv= 16.1 fos 5.8 437 Total, Increased to minimum Tc = 6.0 min Summary for Subcatchment 2S: P-2 Runoff = 3.02 cfs @ 11.97 hrs, Volume= 0.147 af, Depth= 1.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Description 0,230 86 1/3 acre lots, 30% imp, HSG D 0.190 98 Paved roads w/curbs & sewers, HSG D 0.220 98 Water Surface, 0% imp, HSG D 0.540 77 Woods, Good, HSG D 1.180 86 Weighted Average 0.921 83 78.05% Pervious Area 0.259 98 21.95% Impervious Area Tc Length Slope Velocity Capacity Description 1.7 300 0.0350 3.01 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.7 300 Total, Increased to minimum Tc = 6.0 min 193803412_Proposed_160323 Prepared by Stantec Consulting Ltd. HydroCAD®10.00-15 s/n 00429 © 2015 1 Type/1 24-hr 2-yr Rainfall=2.80" Printed 3/31/2016 Summary for Subcatchment 3S: P-3 Runoff = 6.06 cis @ 12.07 hrs, Volume= 0.394 af, Depth= 1.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Description 1.750 86 1/3 acre lots, 30% imp, HSG D 0.760 98 Water Surface, 0% imp, HSG D 0.350 79 Woods/grass comb., Good, HSG D 0.020 98 Paved roads w/curbs & sewers, HSG D 2.880 88 Weighted Average 2.335 86 81.08% Pervious Area 0.545 98 18.92% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (fUft) (ft/sec) (cfs) 3.6 50 0.1800 0.23 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 9.9 70 0.0290 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 1.5 340 0.0350 3.80 Shallow Concentrated Flow, Paved Kv= 20.3 fos 15.0 460 Total Summary for Subcatchment 4S: P-4 Runoff = 1.76 cfs @ 11.97 hrs, Volume= 0.088 af, Depth= 1.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Description 0.330 86 1/3 acre lots, 30% imp, HSG D 0.230 98 Paved roads w/curbs & sewers, HSG D 0.560 91 Weighted Average 0.231 81 41.25% Pervious Area 0.329 98 58.75% Impervious Area Tc Length SI Description 2.0 345 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3fps 2.0 345 Total, Increased to minimum Tc = 6.0 min 193803412 Proposed_160323 Type 1124-hr 2-yr Rainfal1=2.80" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD010.00-15 sin 00429 02015 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 5S: P-5 Runoff = 0.56 cfs @ 11.97 hrs, Volume= 0.027 af, Depth= 1.57" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Description 0.190 86 1/3 acre lots, 30% imp, HSG D 0.020 98 Paved roads w/curbs & sewers. HSG D 0.210 87 Weighted Average 0.133 81 63.33% Pervious Area 0.077 98 36.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.0 345 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 2.0 Runoff = 345 Total, Increased to minimum Tc = 6.0 min Summary for Subcatchment 6S: P-6 1.83 cfs @ 12.01 hrs, Volume= 0.102 af, Depth= 1.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Description 0.180 86 1/3 acre lots, 30% imp, HSG D 0.300 98 Paved roads w/curbs & sewers, HSG D 0.200 80 >75% Grass cover. Good. HSG D 0.680 90 Weighted Average 0.326 80 47.94% Pervious Area 0.354 98 52.06% Impervious Area Tc Length Slope Velocity Capacity Description 8.3 60 0.0330 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 1.6 225 0.0133 2.34 Shallow Concentrated Flow, Paved Kv= 20.3 fps 9.9 285 Total Summary for Subcatchment 7S: P-7 Runoff = 1.30 cfs @ 12.04 hrs, Volume= 0.076 af, Depth= 1.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type 11 24-hr 2-yr Rainfall=2.80" 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. HydroCAD®1 &00-15 s/n 00429 © 2015 1 Area (ac) CN 0.610 86 1/3 acre lots, 30% imp, HSG D 0.427 81 70.00% Pervious Area 0.183 98 30.00% Impervious Area Type/1 24-hr 2-yr Rainfall=2.80" Printed 3/31/2016 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.5 90 0.0330 0.13 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 0.3 110 0.1180 5.53 Shallow Concentrated Flow, Unpaved Kv= 16.1fos 11.8 200 Total Summary for Subcatchment 9S: OS-3 Runoff = 4.64 cfs @ 12.15 hrs, Volume= 0.367 af, Depth= 1.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Descriotion 3.820 79 Woods/grass comb., Good, HSG D 0.180 98 Paved parking. HSG D 4.000 80 Weighted Average 3.820 79 95.50% Pervious Area 0.180 98 4.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.8 180 0,1220 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 3.2 175 0.0340 0.92 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 21.0 355 Total Runoff = Summary for Subcatchment 10S: OS-1 1.30 cfs @ 12.21 hrs, Volume= 0.117 af, Depth= 1.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=2.80" Area (ac) CN Descriotion 0.610 79 Woods/grass comb., Good, HSG D 0.330 98 Paved roads w/curbs & sewers, HSG D 0.940 86 Weighted Average 0.610 79 64.89% Pervious Area 0.330 98 35.11% Impervious Area 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. Type/1 24-hr 2-yr Rainfall=2.80" Printed 3/31/2016 Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 26.9 250 0.0840 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 0.1 15 0.1300 1.80 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 27.0 265 Total Summary for Reach 1 OR: South Inflow Area = 13.510 ac, 21.84% Impervious, Inflow Depth > 0.56" for 2-yr event Inflow = 3.02 cfs @ 12.27 hrs, Volume= 0.627 of Outflow = 3.02 cfs @ 12.27 hrs, Volume= 0.627 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Summary for Pond 5P: South Pond Inflow Area = 13.510 ac, 21.84% Impervious, Inflow Depth = 0.56" for 2-yr event Inflow = 9.97 cfs @ 11.99 hrs, Volume= 0.628 of Outflow = 3.02 cfs @ 12.27 hrs, Volume= 0.627 af, Atten= 70%, Lag= 16.8 min Primary = 3.02 cfs @ 12.27 hrs, Volume= 0.627 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Starting Elev= 995.00' Surf.Area= 10,341 sf Storage= 21,541 cf Peak Elev= 995.82' @ 12.27 hrs Surf.Area= 11,808 sf Storage= 30,569 cf (9,028 cf above start) Plug -Flow detention time= 859.7 min calculated for 0.133 of (21% of inflow) Center -of -Mass det. time= 119.7 min ( 982.7 - 863.0 ) Volume Invert Avail.Storage Storage Description #1 990,00, 61,194 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 990.00 1,120 0 0 992.00 3,159 4,279 4,279 994.00 5,955 9,114 13,393 995.00 10,341 8,148 21,541 996.00 12,141 11,241 32,782 998.00 16,271 28,412 61,194 _Device Routing Invert Outlet Devices #1 Primary 995.00' 18.0" Round Culvert L= 23.0' Ke= 0.500 Inlet / Outlet Invert= 995.00' / 992.88' S= 0.0922 7' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max=3.01 cfs @ 12.27 hrs HW=995.81' (Free Discharge) t1=Culvert (Inlet Controls 3.01 cfs @ 3.07 fps) 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. HydroCAD®10.00-15 s/n 00429 © 2015 1 Inflow Area = 8.740 ac, Inflow = 3.02 cfs @ Outflow = 0.00 cfs @ Primary = 0.00 cfs @ Type 11 24-hr 2-yr Rainfall=2.80" Printed 3/31/2016 Summary for Pond 6P: Wetland East 15.31% Impervious, Inflow Depth = 0.20" 11.97 hrs, Volume= 0.147 of 0.00 hrs, Volume= 0.000 af, 0.00 hrs, Volume= 0.000 of for 2-yr event Atten= 100%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,003.66' @ 24.40 hrs Surf.Area= 5,809 sf Storage= 6,392 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 1.002.00' 68,938 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,002.00 1.907 0 0 1.004.00 6,618 8,525 8,525 1,006.00 13,714 20,332 28,857 1,008.00 26.367 40,081 68,938 Device Routing Invert Outlet Devices #1 Primary 1,006.70' 12.0" Round Culvert L= 23.0' Ke= 0.500 Inlet / Outlet Invert= 1,006.70' / 1,006.47' S= 0.0100 T Cc= 0.900 n= 0.013, Flow Area= 0.79 sf Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,002.00' (Free Discharge) L1=Culvert ( Controls 0.00 cfs) Summary for Pond 7P: Wetland North Inflow Area = 7.560 ac, 14.27% Impervious, Inflow Depth = 1.37" for 2-yr event Inflow = 10.36 cfs @ 12.10 hrs, Volume= 0.863 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,005.39' @ 30.70 hrs Surf.Area= 37,345 sf Storage= 37,608 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 1,004.00' 188,161 cf Custom Stage Data (Prismatic) Listed below (Recalc) 193803412_Proposed_160323 Prepared by Stantec Consulting Ltd. HvdroCADO 10.00-15 s/n 00429 n 2015 1 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,004.00 16,694 0 0 1,006.00 46,368 63,062 63,062 1,008.00 78,731 125,099 188,161 Type/1 24-hr 2-yr Rainfall=2.80" Printed 3/31/2016 Device Routing Invert Outlet Devices #1 Primary 1,006.60' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,004.00' (Free Discharge) L1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond 8P: Filtration Basin Inflow Area = 0.680 ac, 52.06% Impervious, Inflow Depth = 1.80" for 2-yr event Inflow = 1.83 cfs @ 12.01 hrs, Volume= 0.102 of Outflow = 0.09 cfs @ 13.37 hrs, Volume= 0.102 af, Atten= 95%, Lag= 81.6 min Primary = 0.09 cfs @ 13.37 hrs, Volume= 0.102 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,014.65' @ 13.37 hrs Surf.Area= 2,430 sf Storage= 2,229 cf Plug -Flow detention time= 254.7 min calculated for 0.102 of (100% of inflow) Center -of -Mass det. time= 254.6 min ( 1,067.3 - 812.7 ) Volume Invert Avail.Storage Storage Description #1 1,013.50' 6,314 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,013.50 1,487 0 0 1,014.00 1,856 836 836 1,016.00 3,622 5,478 6,314 _Device Routing Invert Outlet Devices #1 Primary 1,011.00' 15.0" Round Culvert L= 56.0' Ke= 0.500 Inlet / Outlet Invert= 1,011.00' / 1,010.00' S= 0.01797 Cc= 0.900 n= 0.013, Flow Area= 1.23 sf #2 Device 1 1,011.50' 6.0" Round Draintile L= 100.0' Ke= 0.500 Inlet / Outlet Invert= 1,011.50' / 1,011.00' S= 0.0050 T Cc= 0.900 n= 0.020 Corrugated PE, corrugated interior, Flow Area= 0.20 sf #3 Device 1 1,015.00' 24.0" Horiz. Orifice/Grate X 0.50 C= 0.600 Limited to weir flow at low heads #4 Device 2 1,013.50' 1.630 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 0.00' #5 Secondary 1,015.50' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 193803412 Proposed_160323 Type // 24-hr 2-yr Rainfall=2. 80" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD® 10.00-15 s/n 00429 © 2015 HydroCAD Software Solutions LLC Page 9 Primary OutFlow Max=0.09 cfs @ 13.37 hrs HW=1,014.65' (Free Discharge) t 1=Culvert (Passes 0.09 cfs of 10.28 cfs potential flow) �2=Draintile (Passes 0.09 cfs of 0.62 cfs potential flow) t-4=Exfiltration ( Controls 0.09 cfs) 3=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,013.50' (Free Discharge) trr-Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond 9P: Filtration Basin Inflow Area = 10.120 ac, 19,04% Impervious, Inflow Depth = 0.23" for 2-yr event Inflow = 3.46 cfs @ 11.99 hrs, Volume= 0.191 of Outflow = 3.10 cfs @ 12.03 hrs, Volume= 0.191 af, Aften= 10%, Lag= 2.6 min Primary = 3.10 cfs @ 12.03 hrs, Volume= 0.191 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,001.44' @ 12.03 hrs Surf.Area= 1.570 sf Storage= 1,782 cf Plug -Flow detention time= 125.7 min calculated for 0.191 of (100% of inflow) Center -of -Mass det. time= 125.9 min ( 943.3 - 817.3 ) Volume Invert Avail.Storage Storage Description #1 1,000.00, 33,378 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,000.00 898 0 0 1,002.00 1,829 2,727 2,727 1,004.00 28,822 30,651 33,378 Device Routing Invert Outlet Devices #1 Primary 995.90' 15.0" Round Culvert L= 60.0' Ke= 0.500 Inlet / Outlet Invert= 995.90' / 995.00' S= 0.0150 'P Cc= 0.900 n= 0.013, Flow Area= 1.23 sf #2 Device 1 1,001.00' 24.0" Horiz. Orifice/Grate X 0.50 C= 0.600 Limited to weir flow at low heads #3 Device 1 999.00' 6.0" Round Draintile L= 100.0' Ke= 0.500 Inlet / Outlet Invert= 999.00' / 998.50' S= 0.0050'P Cc= 0.900 n= 0.013, Flow Area= 0.20 sf #4 Device 3 1,000.00' 1.630 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 0.00' #5 Secondary 1,002.00' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. Type/1 24-hr 2-yr Rainfall=2.80" Printed 3/31/2016 Primary OutFlow Max=3.02 cfs @ 12.03 hrs HW=1,001.44' (Free Discharge) t-1=Culvert (Passes 3.02 cfs of 13.10 cfs potential flow) t2=Orifice/Grate (Weir Controls 2.96 cfs @ 1.08 fps) 3=Draintile (Passes 0.06 cfs of 0.80 cfs potential flow) t-4=Exfiltration ( Controls 0.06 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,000.00' (Free Discharge) t.-&--Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. HydroCAD@ 10.00-15 s/n 00429 @ 2015 1 Type 1124-hr 10-yr Rainfall=4.20" Printed 3/31/2016 Summary for Subcatchment 1S: P-1 Runoff = 11.56 cfs @ 11.97 hrs, Volume= 0.576 af, Depth= 2.82" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN 2.310 86 1/3 acre lots, 30% imp, HSG D 0.140 98 Water Surface 0% imp, HSG D 2.450 87 Weighted Average 1.757 82 71.71 % Pervious Area 0.693 98 28.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.3 60 0.1670 0.23 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 1.5 377 0.0693 4.24 Shallow Concentrated Flow, Unoaved Kv= 16.1fos 5.8 437 Total. Increased to minimum Tc = 6.0 min Summary for Subcatchment 2S: P-2 Runoff = 5.41 cfs @ 11.97 hrs, Volume= 0.268 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN Description 0.230 86 1/3 acre lots, 30% imp, HSG D 0.190 98 Paved roads w/curbs & sewers, HSG D 0.220 98 Water Surface, 0% imp, HSG D 0.540 77 Woods, Good, HSG D 1.180 86 Weighted Average 0.921 83 78.05% Pervious Area 0.259 98 21.95% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 300 0.0350 3.01 Shallow Concentrated Flow, Unoaved Kv= 16.1 fos 1.7 300 Total, Increased to minimum Tc = 6.0 min 193803412 Proposed_160323 Type 1124-hr 10-yr Rainfall=4.20" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD®10.00-15 s/n 00429 C 2015 HvdroCAD Software Solutions LLC Paoe 12 Summary for Subcatchment 3S: P-3 Runoff = 10.59 cfs @ 12.07 hrs, Volume= 0.700 af, Depth= 2.92" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN Descriotion 1.750 86 1/3 acre lots, 30% imp, HSG D 0.760 98 Water Surface, 0% imp, HSG D 0.350 79 Woods/grass comb., Good, HSG D 0.020 98 Paved roads w/curbs & sewers, HSG D 2.880 88 Weighted Average 2.335 86 81.08% Pervious Area 0.545 98 18.92% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (f /ft) (ft/sec) (cfs) 3.6 50 0.1800 0.23 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 9.9 70 0.0290 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 1.5 340 0.0350 3.80 Shallow Concentrated Flow, Paved Kv= 20.3 fos 15.0 460 Total Summary for Subcatchment 4S: P-4 Runoff = 2.91 cfs @ 11.96 hrs, Volume= 0.150 af, Depth= 3.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN Descriotion 0.330 86 1/3 acre lots, 30% imp, HSG D 0.230 98 Paved roads w/curbs & sewers, HSG D 0.560 91 Weighted Average 0.231 81 41.25% Pervious Area 0.329 98 58.75% Impervious Area Tc Length Slope Velocity Capacity Description 2.0 345 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3fps 2.0 345 Total. Increased to minimum Tc = 6.0 min 193803412_Proposed _160323 Type // 24-hr 10-yr Rainfall=4.20" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD®10.00-15 s/n 00429 © 2015 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 5S: P-5 Runoff = 0.99 cfs @ 11.97 hrs, Volume= 0.049 af, Depth= 2.82" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN Description 0.190 86 1/3 acre lots, 30% imp, HSG D 0.020 98 Paved roads w/curbs & sewers, HSG D 0.210 87 Weighted Average 0.133 81 63.33% Pervious Area 0.077 98 36.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (f /ft) (ft/sec) (cfs) 2.0 345 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3fos 2.0 345 Total, Increased to minimum Tc = 6.0 min Summary for Subcatchment 6S: P-6 Runoff = 3.09 cfs @ 12.01 hrs, Volume= 0.176 af, Depth= 3.11" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN Descriotion 0.180 86 1/3 acre lots, 30% imp, HSG D 0.300 98 Paved roads w/curbs & sewers, HSG D 0.200 80 >75% Grass cover, Good, HSG D 0.680 90 Weighted Average 0.326 80 47.94% Pervious Area 0.354 98 52.06% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.3 60 0.0330 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 1.6 225 0.0133 2.34 Shallow Concentrated Flow, Paved Kv= 20.3fos 9.9 285 Total Summary for Subcatchment 7S: P-7 Runoff = 2.34 cfs @ 12.03 hrs, Volume= 0.139 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type 11 24-hr 10-yr Rainfall=4.20" 193803412_Proposed_160323 Type 1124-hr 10-yr Rainfall=4.20" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD®10.00-15 s1n 00429 02015 HvdroCAD Software Solutions LLC Pace 14 Area (ac) CN Description 0.610 86 1/3 acre lots. 30% imo. HSG D 0.427 81 70.00% Pervious Area 0.183 98 30.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.5 90 0.0330 0.13 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 0.3 110 0.1180 5.53 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 11.8 200 Total Summary for Subcatchment 9S: OS-3 Runoff = 9.50 cfs @ 12.14 hrs, Volume= 0.736 af, Depth= 2.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=4.20" Area (ac) CN Description 3.820 79 Woods/grass comb., Good, HSG D 0.180 98 Paved parkinq, HSG D 4.000 80 Weighted Average 3.820 79 95.50% Pervious Area 0.180 98 4.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.8 180 0.1220 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 3.2 175 0.0340 0.92 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 21.0 355 Total Summary for Subcatchment 10S: OS-1 Runoff = 2.37 cfs @ 12.20 hrs, Volume= 0.214 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type 11 24-hr 10-yr Rainfall=4.20" Area (ac) CN Description 0.610 79 Woods/grass comb., Good, HSG D 0.330 98 Paved roads w/curbs & sewers. HSG D 0.940 86 Weighted Average 0.610 79 64.89% Pervious Area 0.330 98 35.11% Impervious Area 193803412_Proposed_160323 Prepared by Stantec Consulting Ltd. HydroCADO 10.00-15 s/n 00429 © 2015 Tc Length Slope Velocity Capacity Description Type 1124-hr 10-yr Rainfall=4.20" Printed 3/31/2016 26.9 250 0.0840 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 0.1 15 0.1300 1.80 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 27.0 265 Total Summary for Reach 1 OR: South Inflow Area = 13.510 ac, 21.84% Impervious, Inflow Depth = 1.00" for 10-yr event Inflow = 6.65 cfs @ 12.18 hrs, Volume= 1.127 of Outflow = 6.65 cfs @ 12.18 hrs, Volume= 1.127 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs, Summary for Pond 5P: South Pond Inflow Area = 13.510 ac, 21.84% Impervious, Inflow Depth = 1.00" for 10-yr event Inflow = 17.92 cfs @ 11.98 hrs, Volume= 1.127 of Outflow = 6.65 cfs @ 12.18 hrs, Volume= 1.127 af, Atten= 63%, Lag= 12.0 min Primary = 6.65 cfs @ 12.18 hrs, Volume= 1.127 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Starting Elev= 995.00' Surf.Area= 10,341 sf Storage= 21.541 cf Peak Elev= 996.36' @ 12.18 hrs Surf.Area= 12,874 sf Storage= 37,223 cf (15,682 cf above start) Plug -Flow detention time= 368.2 min calculated for 0.632 of (56% of inflow) Center -of -Mass det. time= 89.9 min ( 922.8 - 832.9 ) Volume Invert Avail.Storage Storage Description #1 990.00, 61,194 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 990.00 1,120 0 0 992.00 3,159 4,279 4,279 994.00 5,955 9,114 13,393 995.00 10,341 8,148 21,541 996.00 12,141 11,241 32,782 998.00 16,271 28,412 61,194 Device Routing Invert Outlet Devices #1 Primary 995.00' 18.0" Round Culvert L= 23.0' Ke= 0.500 Inlet / Outlet Invert= 995.00' / 992.88' S= 0.0922 '/' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max=6.65 cfs @ 12.18 hrs HW=996.35' (Free Discharge) t1=Culvert (Inlet Controls 6.65 cfs @ 3.96 fps) 193803412 Proposed_160323 Type 1124-hr 10-yr Rainfall=4.20" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD®10.00-15 s/n 00429 02015 HydroCAD Software Solutions LLC Page 16 Inflow Area = 8.740 ac, Inflow = 5.41 cfs @ Outflow = 0.00 cfs @ Primary = 0.00 cfs @ Summary for Pond 6P: Wetland East 15.31% Impervious, Inflow Depth = 0.37" 11.97 hrs, Volume= 0.268 of 0.00 hrs, Volume= 0.000 af, 0.00 hrs, Volume= 0.000 of for 10-yr event Atten= 100%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,004.43' @ 24.40 hrs Surf.Area= 8,137 sf Storage= 11,684 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 1,002.00' 68,938 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,002.00 1,907 0 0 1,004.00 6,618 8,525 8,525 1,006.00 13,714 20,332 28,857 1,008.00 26,367 40,081 68,938 dice Routing Invert Outlet Devices #1 Primary 1,006.70' 12.0" Round Culvert L= 23.0' Ke= 0.500 Inlet / Outlet Invert= 1,006.70' / 1,006.47' S= 0.01007 Cc= 0.900 n= 0.013, Flow Area= 0.79 sf Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,002.00' (Free Discharge) t1=Culvert ( Controls 0.00 cfs) Summary for Pond 7P: Wetland North Inflow Area = 7.560 ac, 14.27% Impervious, Inflow = 19.49 cfs @ 12.10 hrs, Volume Outflow = 0.00 cfs @ 0.00 hrs, Volume Primary = 0.00 cfs @ 0.00 hrs, Volume Inflow Depth = 2.56" 1.612 of 0.000 af, = 0.000 of for 10-yr event Atten= 100%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,006.15' @ 34.30 hrs Surf.Area= 48,799 sf Storage= 70,209 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 1,004.00' 188,161 cf Custom Stage Data (Prismatic) Listed below (Recalc) 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. HvdroCAD010.00-15 s/n 00429 ©2015 1 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,004.00 16,694 0 0 1,006.00 46,368 63,062 63,062 1,008.00 78,731 125,099 188,161 LLC Type 1124-hr 10-yr Rainfall=4.20" Printed 3/31/2016 vice Routing Invert Outlet Devices #1 Primary 1,006.60' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,004.00' (Free Discharge) t1=13road-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond 8P: Filtration Basin Inflow Area = 0.680 ac, 52.06% Impervious, Inflow Depth = 3.11" for 10-yr event Inflow = 3.09 cfs @ 12.01 hrs, Volume= 0.176 of Outflow = 0.58 cfs @ 12.28 hrs, Volume= 0.176 af, Atten= 81%, Lag= 16.1 min Primary = 0.58 cfs @ 12.28 hrs, Volume= 0.176 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,015.13' @ 12.28 hrs Surf.Area= 2,853 sf Storage= 3,493 cf Plug -Flow detention time= 284.8 min calculated for 0.176 of (100% of inflow) Center -of -Mass det. time= 284.9 min ( 1,082.1 - 797.3 ) Volume Invert Avail.Storage Storage Description #1 1,013.50' 6,314 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,013.50 1,487 0 0 1,014.00 1,856 836 836 1,016.00 3,622 5,478 6,314 Device Routing Invert Outlet Devices #1 Primary 1,011.00' 15.0" Round Culvert L= 56.0' Ke= 0.500 Inlet / Outlet Invert= 1,011.00' / 1,010.00' S= 0.01797 Cc= 0.900 n= 0.013, Flow Area= 1.23 sf #2 Device 1 1,011.50' 6.0" Round Draintile L= 100.0' Ke= 0.500 Inlet / Outlet Invert= 1,011.50' / 1,011.00' S= 0.00507 Cc= 0.900 n= 0.020 Corrugated PE, corrugated interior, Flow Area= 0.20 sf #3 Device 1 1,015.00' 24.0" Horiz. Orifice/Grate X 0.50 C= 0.600 Limited to weir flow at low heads #4 Device 2 1,013.50' 1.630 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 0.00' #5 Secondary 1,015.50' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0A0 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 193803412 Proposed_160323 Type 1124-hr 10-yr Rainfall=4.20" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD® 10.00-15 s/n 00429 © 2015 HydroCAD Software Solutions LLC Page 18 Primary OutFlow Max=0.58 cfs @ 12.28 hrs HW=1,015.13' (Free Discharge) t1=Culvert (Passes 0.58 cfs of 11.06 cfs potential flow) �2=Draintile (Passes 0.11 cfs of 0.67 cfs potential flow) L4=Exfiltration ( Controls 0.11 cfs) 3=Orifice/Grate (Weir Controls 0.47 cfs @ 0.59 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,013.50' (Free Discharge) L5r-Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond 9P: Filtration Basin Inflow Area = 10.120 ac, 19.04% Impervious, Inflow Depth = 0.40" for 10-yr event Inflow = 5.97 cfs @ 11.98 hrs, Volume= 0.338 of Outflow = 5.57 cfs @ 12.02 hrs, Volume= 0.338 af, Atten= 7%, Lag= 1.9 min Primary = 5.57 cfs @ 12.02 hrs, Volume= 0.338 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,001.66' @ 12.02 hrs Surf.Area= 1,671 sf Storage= 2,132 cf Plug -Flow detention time= 82.6 min calculated for 0.338 of (100% of inflow) Center -of -Mass det. time= 82.5 min ( 884.1 - 801.6 ) Volume Invert Avail.Storage Storage Description #1 1,000.00, 33,378 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store _(feet) (sq-ft) (cubic -feet) (cubic -feet) 1,000.00 898 0 0 1,002.00 1,829 2,727 2,727 1,004.00 28,822 30,651 33,378 Device Routing Invert Outlet Devices #1 Primary 995.90' 15.0" Round Culvert L= 60.0' Ke= 0.500 Inlet / Outlet Invert= 995.90' / 995.00' S= 0.0150'P Cc= 0.900 n= 0.013, Flow Area= 1.23 sf #2 Device 1 1,001.00' 24.0" Horiz. OrificelGrate X 0.50 C= 0.600 Limited to weir flow at low heads #3 Device 1 999.00' 6.0" Round Draintile L= 100.0' Ke= 0.500 Inlet / Outlet Invert= 999.00' / 998.50' S= 0.00507 Cc= 0.900 n= 0.013, Flow Area= 0.20 sf #4 Device 3 1,000.00' 1.630 inlhr Exfiltration over Surface area Conductivity to Groundwater Elevation = 0.00' #5 Secondary 1,002.00' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 193803412 Proposed_160323 Prepared by stantec Consulting Ltd. Type II 24-hr 10-yr Rainfall=4.20" Printed 3/31/2016 Primary OutFlow Max=5.45 cfs @ 12.02 hrs HW=1,001.65' (Free Discharge) t 1=Culvert (Passes 5.45 cfs of 13.38 cfs potential flow) �-2=Orifice/Grate (Weir Controls 5.38 cfs @ 1.32 fps) 3=Draintile (Passes 0.06 cfs of 0.84 cfs potential flow) t4=Exfiltration ( Controls 0.06 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,000.00' (Free Discharge) t-S=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. Software Solutions LLC Type II 24-hr 100-yr Rainfall=6.00" Printed 3/31/2016 Summary for Subcatchment 1S: P-1 Runoff = 18.03 cfs @ 11.96 hrs, Volume= 0.922 af, Depth= 4.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN Description 2.310 86 1/3 acre lots, 30% imp, HSG D 0.140 98 Water Surface 0% imp HSG D 2.450 87 Weighted Average 1.757 82 71.71 % Pervious Area 0.693 98 28.29% Impervious Area Tc Length Slope iin) (feet) (ft/ft) 4.3 60 0.1670 1.5 377 0.0693 Description 0.23 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 4.24 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 5.8 437 Total, Increased to minimum Tc = 6.0 min Summary for Subcatchment 2S: P-2 Runoff = 8.53 cfs @ 11.97 hrs, Volume= 0.434 af, Depth= 4.41" Runoff by SCS TR-20 method, UH=SCS Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN Description 0.230 86 1/3 acre lots, 30% imp, HSG D 0.190 98 Paved roads w/curbs & sewers, HSG D 0.220 98 Water Surface, 0% imp, HSG D 0.540 77 Woods, Good, HSG D 1.180 86 Weighted Average 0.921 83 78.05% Pervious Area 0.259 98 21.95% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 300 0.0350 3.01 Shallow Concentrated Flow, Unpaved Kv= 16.1fos 1.7 300 Total. Increased to minimum Tc = 6.0 min 193803412_Proposed_160323 Type 1124-hr 100-yr Rainfall=6.00" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD® 10.00-15 s/n 00429 © 2015 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 3S: P-3 Runoff = 16.46 cfs @ 12.06 hrs, Volume= 1.110 af, Depth= 4.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN Description 1.750 86 1/3 acre lots, 30% imp, HSG D 0.760 98 Water Surface, 0% imp, HSG D 0.350 79 Woods/grass comb., Good, HSG D 0.020 98 Paved roads w/curbs & sewers, HSG D 2.880 88 Weighted Average 2.335 86 81.08% Pervious Area 0.545 98 18.92% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.6 50 0.1800 0.23 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 9.9 70 0.0290 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 1.5 340 0.0350 3.80 Shallow Concentrated Flow, Paved Kv= 20.3 fps 15.0 460 Total Summary for Subcatchment 4S: P-4 Runoff = 4.38 cfs @ 11.96 hrs, Volume= 0.231 af, Depth= 4.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN 0,330 86 1/3 acre lots, 30% imp, HSG D 0.230 98 Paved roads w/curbs & sewers, HSG D 0.560 91 Weighted Average 0.231 81 41.25% Pervious Area 0.329 98 58.75% Impervious Area Tc Length Slope Velocity Capacity Description 2.0 345 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fps 2.0 345 Total, Increased to minimum Tc = 6.0 min 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. HvdroCAD® 10.00-15 s/n 00429 n 2015 1 Type 1124-hr 100-yr Rainfall=6.00" Printed 3/31/2016 Summary for Subcatchment 5S: P-5 Runoff = 1.55 cfs @ 11.96 hrs, Volume= 0.079 af, Depth= 4.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN Description 0.190 86 1/3 acre lots, 30% imp, HSG D 0.020 98 Paved roads w/curbs & sewers, HSG D 0.210 87 Weighted Average 0.133 81 63.33% Pervious Area 0.077 98 36.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (fUsec) (cfs) 2.0 345 0.0200 2.87 Shallow Concentrated Flow, Paved Kv= 20.3 fos 2.0 345 Total, Increased to minimum Tc = 6.0 min Summary for Subcatchment 6S: P-6 Runoff = 4.69 cfs @ 12.01 hrs, Volume= 0.275 af, Depth= 4.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type tl 24-hr 100-yr Rainfall=6.00" Area (ac) CN Description 0.180 86 1/3 acre lots, 30% imp, HSG D 0.300 98 Paved roads w/curbs & sewers, HSG D 0.200 80 >75% Grass cover, Good, HSG D 0.680 90 Weighted Average 0.326 80 47.94% Pervious Area 0.354 98 52.06% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.3 60 0.0330 0.12 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 1.6 225 0.0133 2.34 Shallow Concentrated Flow, Paved Kv= 20.3 fps 9.9 285 Total Summary for Subcatchment 7S: P-7 Runoff = 3.71 cfs @ 12.03 hrs, Volume= 0.224 af, Depth= 4.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type 11 24-hr 100-yr Rainfall=6.00" 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. Type 1124-hr 100-yr Rainfall=6.00" Printed 3/31/2016 Area (ac) CN Description _ 0.610 86 1/3 acre lots 30% imp HSG D 0.427 81 70.00% Pervious Area 0.183 98 30.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.5 90 0.0330 0.13 Sheet Flow, Grass: Dense n= 0.240 P2= 2.80" 0.3 110 0.1180 5.53 Shallow Concentrated Flow, Unoaved Kv= 16.1fos 11.8 200 Total Summary for Subcatchment 9S: OS-3 Runoff = 16.23 cfs @ 12.14 hrs, Volume= 1.260 af, Depth= 3.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN Descriotion 3.820 79 Woods/grass comb., Good, HSG D 0.180 98 Paved parking, HSG D 4.000 80 Weighted Average 3.820 79 95.50% Pervious Area 0.180 98 4.50% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.8 180 0.1220 0.17 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 3.2 175 0.0340 0.92 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 21.0 355 Total Summary for Subcatchment 10S: OS-1 Runoff = 3.78 cfs @ 12.20 hrs, Volume= 0.345 af, Depth= 4.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=6.00" Area (ac) CN Descriotion 0.610 79 Woods/grass comb., Good, HSG D 0.330 98 Paved roads w/curbs & sewers, HSG D 0.940 86 Weighted Average 0.610 79 64.89% Pervious Area 0.330 98 35.11% Impervious Area 193803412_Proposed_160323 Type/1 24-hr 100-yr Rainfall=6.00" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD@ 10.00-15 s/n 00429 @ 2015 HydroCAD Software Solutions LLC Page 24 Tc (min) Length (feet) Slope (ft/ft) Velocity (fUsec) Capacity Description (cfs) 26.9 250 0.0840 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 2.80" 0.1 15 0.1300 1.80 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 27.0 265 Total Summary for Reach 1 OR: South Inflow Area = 13.510 ac, 21.84% Impervious, Inflow Depth > 1.60" for 100-yr event Inflow = 9.65 cfs @ 12.21 hrs, Volume= 1.804 of Outflow = 9.65 cfs @ 12.21 hrs, Volume= 1.804 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Summary for Pond 5P: South Pond Inflow Area = 13.510 ac, 21.84% Impervious, Inflow Depth = 1,60" for 100-yr event Inflow = 27.11 cfs @ 11.98 hrs, Volume= 1.806 of Outflow = 9.65 cfs @ 12.21 hrs, Volume= 1.804 af, Atten= 64%, Lag= 13.9 min Primary = 9.65 cfs @ 12.21 hrs, Volume= 1.804 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Starting Elev= 995.00' Surf.Area= 10,341 sf Storage= 21,541 cf Peak Elev= 997.04' @ 12.21 hrs Surf.Area= 14,282 sf Storage= 46,477 cf (24,936 cf above start) Plug -Flow detention time= 254.8 min calculated for 1.310 of (73% of inflow) Center -of -Mass det. time= 73.8 min ( 891.8 - 818.0 ) _Volume Invert Avail.Storage Storage Description #1 990.00, 61,194 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 990.00 1,120 0 0 992.00 3,159 4,279 4,279 994.00 5,955 9,114 13,393 995.00 10,341 8,148 21,541 996.00 12,141 11,241 32,782 998.00 16,271 28,412 61,194 _Device Routing Invert Outlet Devices #1 Primary 995.00' 18.0" Round Culvert L= 23.0' Ke= 0.500 Inlet / Outlet Invert= 995.00' / 992.88' S= 0.0922'P Cc= 0.900 n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max=9.64 cfs @ 12.21 hrs HW=997.03' (Free Discharge) L1=Culvert (Inlet Controls 9.64 cfs @ 5.46 fps) 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. Type 1124-hr 100-yr Rainfall=6.00" Printed 3/31/2016 Summary for Pond 6P: Wetland East Inflow Area = 8.740 ac, 15.31 % Impervious, Inflow Depth = 1.27" for 100-yr event Inflow = 8.53 cfs @ 11.97 hrs, Volume= 0.926 of Outflow = 0.00 cfs @ 44.14 hrs, Volume= 0.004 af, Atten= 100%, Lag= 1,930.3 min Primary = 0.00 cfs @ 44.14 hrs, Volume= 0.004 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,006.71' @ 44.14 hrs Surf.Area= 18,228 sf Storage= 40,252 cf Plug -Flow detention time= 2,783.2 min calculated for 0.004 of (0% of inflow) Center -of -Mass det. time= 2,061.9 min ( 3,167.7- 1,105.8 ) Volume Invert Avail.Storage Storage Description #1 1,002.00' 68,938 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,002.00 1,907 0 0 1,004.00 6,618 8,525 8,525 1,006.00 13,714 20,332 28,857 1,008.00 26,367 40,081 68,938 Device Routing Invert Outlet Devices #1 Primary 1,006.70' 12.0" Round Culvert L= 23.0' Ke= 0.500 Inlet / Outlet Invert= 1,006.70' / 1,006.47' S= 0.0100 T Cc= 0.900 n= 0.013, Flow Area= 0.79 sf Primary OutFlow Max=0.00 cfs @ 44.14 hrs HW=1,006.71' (Free Discharge) L1=Culvert (Barrel Controls 0.00 cfs @ 0.41 fps) Summary for Pond 7P: Wetland North Inflow Area = 7.560 ac, 14.27% Impervious, Inflow Depth = 4.20" for 100-yr event Inflow = 34.52 cfs @ 12.10 hrs, Volume= 2.645 of Outflow = 0.64 cfs @ 19.79 hrs, Volume= 0.492 af, Atten= 98%, Lag= 461.8 min Primary = 0.64 cfs @ 19.79 hrs, Volume= 0.492 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,006.69' @ 19.79 hrs Surf.Area= 57,482 sf Storage= 98,728 cf Plug -Flow detention time= 735.7 min calculated for 0.492 of (19% of inflow) Center -of -Mass det. time= 548.1 min ( 1,380.0 - 832.0 ) Volume Invert Avail.Storage Storage Description #1 1,004.00' 188,161 cf Custom Stage Data (Prismatic) Listed below (Recalc) 193803412 Proposed_160323 Prepared by Stantec Consulting Ltd. HydrOCAD®10.00-15 s/n 00429 © 2015 HydroCAD Software S Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,004.00 16,694 0 0 1,006.00 46,368 63,062 63,062 1,008.00 78,731 125,099 188,161 Type 1124-hr 100-yr Rainfall=6.00" Printed 3/31/2016 Device Routing Invert Outlet Devices #1 Primary 1,006.60' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.64 cfs @ 19.79 hrs HW=1,006.69' (Free Discharge) t1=Broad-Crested Rectangular Weir (Weir Controls 0.64 cfs @ 0.73 fps) Summary for Pond 8P: Filtration Basin Inflow Area = 0.680 ac, 52.06% Impervious, Inflow Depth = 4.85" for 100-yr event Inflow = 4.69 cfs @ 12.01 hrs, Volume= 0.275 of Outflow = 2.94 cfs @ 12.11 hrs, Volume= 0.275 af, Atten= 37%, Lag= 6.4 min Primary = 2.94 cfs @ 12.11 hrs, Volume= 0.275 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,015.42' @ 12.11 hrs Surf.Area= 3,112 sf Storage= 4,370 cf Plug -Flow detention time= 222.1 min calculated for 0.275 of (100% of inflow) Center -of -Mass det. time= 222.0 min ( 1,007.0 - 785.0) Volume Invert Avail.Storage Storage Description #1 1,013.50' 6,314 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,013.50 1,487 0 0 1,014.00 1,856 836 836 1,016.00 3,622 5,478 6,314 Invert Outlet Devices #1 Primary 1,011.00, #2 Device 1 1,011.50' #3 Device 1 1,015.00' #4 Device 2 1,013.50' #5 Secondary 1,015.50' 15.0" Round Culvert L= 56.0' Ke= 0.500 Inlet / Outlet Invert= 1,011.00' / 1,010.00' S= 0.01 79T Cc= 0.900 n= 0.013, Flow Area= 1.23 sf 6.0" Round Draintile L= 100.0' Ke= 0.500 Inlet / Outlet Invert= 1,011.50' / 1,011.00' S= 0.0050 T Cc= 0.900 n= 0.020 Corrugated PE, corrugated interior, Flow Area= 0.20 sf 24.0" Horiz. Orifice/Grate X 0.50 C= 0.600 Limited to weir flow at low heads 1.630 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 0.00' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 193803412_Proposed _160323 Type 1124-hr 100-yr Rainfall=6.00" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCAD®10.00-15 s1n 00429 © 2015 HydroCAD Software Solutions LLC Page 27 Primary OutFlow Max=2.86 cfs @ 12.11 hrs HW=1,015.41' (Free Discharge) t1=Culvert (Passes 2.86 cfs of 11.50 cfs potential flow) �2=Draintile (Passes 0.12 cfs of 0.69 cfs potential flow) a-,iExfiltration ( Controls 0.12 cfs) 3=Orfice/Grate (Weir Controls 2.74 cfs @ 1.05 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,013.50' (Free Discharge) LS=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond 9P: Filtration Basin Inflow Area = 10.120 ac, 19.04% Impervious, Inflow Depth > 0.64" for 100-yr event Inflow = 9.21 cfs @ 11.98 hrs, Volume= 0.539 of Outflow = 7.84 cfs @ 12.04 hrs, Volume= 0.539 af, Atten= 15%, Lag= 3.3 min Primary = 7.75 cfs @ 12.03 hrs, Volume= 0.538 of Secondary = 0.10 cfs @ 12.05 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 1,002.03' @ 12.03 hrs Surf.Area= 2,209 sf Storage= 2,784 cf Plug -Flow detention time= 58.1 min calculated for 0.539 of (100% of inflow) Center -of -Mass det. time= 58.0 min ( 866.0 - 808.0 ) Volume Invert Avail.Storage Storage Description #1 1,000.00, 33,378 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 1,000.00 898 0 0 1,002.00 1,829 2,727 2,727 1,004.00 28,822 30,651 33,378 Device Routing Invert Outlet Devices #1 Primary 995.90' 15.0" Round Culvert L= 60.0' Ke= 0.500 Inlet / Outlet Invert= 995.90' / 995.00' S= 0.0150'P Cc= 0.900 n= 0.013, Flow Area= 1.23 sf #2 Device 1 1,001.00' 24.0" Horiz. Orifice/Grate X 0.50 C= 0.600 Limited to weir flow at low heads #3 Device 1 999.00' 6.0" Round Draintile L= 100.0' Ke= 0.500 Inlet / Outlet Invert= 999.00' / 998.50' S= 0.0050 'P Cc= 0.900 n= 0.013, Flow Area= 0.20 sf #4 Device 3 1,000.00' 1.630 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 0.00' #5 Secondary 1,002.00' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 193803412 Proposed_160323 Type 1124-hr 100-yr Rainfall=6.00" Prepared by Stantec Consulting Ltd. Printed 3/31/2016 HydroCADO10.00-15 s/n 00429 0 2015 HydroCAD Software Solutions LLC Page 28 Primary OutFlow Max=7.67 cfs @ 12.03 hrs HW=1,002.01' (Free Discharge) t1=Culvert (Passes 7.67 cfs of 13.84 cfs potential flow) 2=Orifice/Grate (Orifice Controls 7.59 cfs @ 2.42 fps) 1 3=Draintile (Passes 0.07 cfs of 0.89 cfs potential flow) t4=Exfiltration ( Controls 0.07 cfs) Secondary OutFlow, Max=0.07 cfs @ 12.05 hrs HW=1,002.02' (Free Discharge) L5=Broad-Crested Rectangular Weir (Weir Controls 0.07 cfs @ 0.35 fps) P8 OUTPUT P8 Urban catchment Model. Vernon 3 a Case 193803412 LekeLuty Wa11andNORTH C 16032RrA0ale 0IM191 mine Lake Lucy LanDale 1M1IR2 Pred'de IMP 0989.M Events 134 P.M'de ounew OP TgelWs 16460 Run Dele 0"1I16 precip(m) SO Sall 967 TOldlyrs I M Max snowfall Temperature(eeg-0 6nowMah Temperature(OegO Snoymett Coat(m)ded'-Day) Soh Freers Temp (eeg-F) Snowmen Acenawon Fader Evap Ttans. Calibration Fader Growing Season Stan Month Graying Season End Mach SOay AmecMem Rainfall I Runoff (ad es) Season CN rrmecedem Morsture Conbawn IiT Season MhterYMU 016 320 320 0OF 32.0 too t o0 5 10 GllGrpwng 10NonGrgvng to MYIBrY1vU Nine P3 PE OS3 Runoff Deuce WeOand North But InflGatMt to Device "emsed Afea 288 Frtlratwn Basm ow land North 0.6a a SCS Curve Number(Pervious) Scale Facer for Penmus Runoff Leap Intlrted, Connedw lmpery Frammn o6 80 79 t 1 0 01892 0 0 UnSvepl Impervious Fre". UOSwpPI Da0sweren Sorage (menesl UeSwept lmpery Ru0oRCoefinprom UnS epl Scale Factor far Panicle Loads 0 049M 0 a 002 002 0 1 1 0 1 1 0 Swept Impervious Fraction Swept Depression Store,(inches) Swept lmperv. Runoff coefficient Swept Scale Fader for Panicle Loads Sweeping Frequerry Sweeping EBGency Sweeping San Cale(MMDD) Sweepm9 Step Dale (MMDD) 0 0 0 002 002 002 1 1 1 1 I t 0 0 0 1 1 1 tot 101 tot 1231 1231 1231 :Name Type 1. 0" tl0" ay ON1e1 e Removal scale Facer t Elevswn din v Area lacreal ment Pod Area (acres) reard Pont Volpme (ec-0f pool Infie Rate ONh0 Pool Prey (.as) Pool Volume(acf) Pool mfitt Rale tomr) Ina%Basin Void Freedom (%) Deentiun PoM 0" Parameters Cadet Type Outlet Once Diameter (in) Once Dnoharge Coef ONIH Weir Leri (11) Weir Discharye Coe Perforated Rlsar Height (I) Number m ..*am Riser Holes Dumater Flood Pool Dun Time (Iris) ORIFICE NONE 24 06 Swale Parameters Length of Flow Path (IO Slope of Pitchy Path % Ronom WiJth fly, Side SIODe(ft-yr m Manmum Depth of Flow (a) Mannings n Constam Hydraulic Model 60 12 400 00001 0 oW i 024 0 Roe. Sgeler. gpuihr Parameltt Hiedrai Res Time nnsi Per ink Data Far nul pop PW Clew Poi, Pic% P30% P50% P63% FX2bon EBinency 1`4) turning Velocity(Nnr) First Order Decay Rare (I Way) 2nd Order Decay(1/day-ppm) 90 100 100 Ip0 100 0 003 03 15 15 0 0 0 0 0 0 0 0 0 0 impaulac Rural Conc(,am) Pemous Runoff Cond (ppm) Pei Cionc E ppnem Ptcum Rare (Ibsac-day) Pilule Removal Rare(tiday) WasmoRCcelaoem Was E�ppnem Sweeper EaSuenq 1 0 0 0 0 I 1O0 i W 1 W 200 0 1 1 1 1 0 1 75 1 75 1 75 3 5 0 025 025 O25 025 0 20 20 2l1 20 0 2 2 2 2 0 0 0 5 15 I =OW@y —PawdmOaN CanlpwrNa Nano T55 I TP TKN cU I PB I ZN I 11C I I Levels 5 0025 2 2 002 5 O1 Levm2 to o0s 1 00oa6 0o1a oO%2 Os Of ( 0.5 1 0.02 Domem smite Faster 1 1 11 1 1t1 1 1 1 1 Panicle Composdion (mgAgi Po% 0 9WW 6000W 136W 2000 6a0C,30 2500W P10% 1000000 3W 150W 3<0 160 16W nMX, Pao% 1W0000 mm 15000 300 160 1600 22500 P50% 1WOo00 31 15000 360 160 1600 22500 pi 1rMl0OW 0 0 Sao 1ff0 0 22500 Pe UNan Caiderect Mcca, Version 31 Run Cate M1116 Case 193WU12_IakeLury WegandNORTH C IN3240 FnalOate olmi l Preapgn) DO Tek Lake Lucy Lasloele lml3 Rampn) 4076 PrecFk clap 4989pcp Evmis 134 Sn-(,t) 962 PaOFlk nury50.p8P TcI.H. two TINyYrs L" Maas Balances by Vanade Vacate, Fbw Mass Bewcce Term 01 waters6M mMws m uteueam Bence 03mfiltale 01 exh ale M nnmel ounel 07 spMay "Nat 09Idalaflaw 10 sunace mrllbw it grourdw Oumow 12 Will oudgev ti storge increase 15 rresz dance ccack IuaE R..... (%) Vanacke PO% Mess Balance Term 01 watershed ar o 02 upstream deeme 03 moon. w exegrate 05the. O6 norrrol nutlet 97 splMay outlet 09 total lnfiow I surface oulflsv 11 groundw ounlOw 12 Met oN ue, 131cut I'.PPeu H storage increase 15 mass G land check LnaU Reduction I%) vanade Plo% Mass Balance Teem 01 w uarched.n l 02 uMumeu dewce 03 infiTate 05 fig.. Do rrornel outlet 07 splMay ougel ce seamen. deny DO 1o01m6aw 10 sudare armor 121.1.1 oumw 13 tdal re,,et 1. storage increase 15 cress Galante check Lord R...., (%) ..b. PW% Mass Balance Temr 01 watershed iu b 02 urcuream denu 03mfiNale 05 filicred 06 narnal 00el 01 spkway octal M warren -dec.y Do D1.1 inflcw 10 surface oNflwr 12teal nN- 14 amrage increase 15 nass G atue, check Load Reduction I%) VaMBIe PW% M. Be eree Term 01 waleSMd m unM 02 uWrQr. de.rz F. ac.B OVERALL Fileaeon Bain WM With Buhr MMW NaM 754 153 3M 291 000 090 aW e81 001 153 001 0W 001 1.53 001 00O 00o 000 000 0DO 52 0.00 3 O6 ] 52 7 54 153 309 752 752 15.3 3M 252 001 Om 001 00O 754 153 309 752 000 0c0 0011 OW 000 00o aco 000 000 0GO Om 000 In (W OVERALL FiNa4on Betu 6aM North Buffer Nc1 cc Norm 1257 4I6 8.1 0DO 000 om o 00 a 79 00a 416 006 000 000 012 0.W ON 376 3.75 0.03 000 aGo 0W 000 000 8,79 000 8.37 8 79 1257 416 Sat 879 879 062 837 829 000 0GO 0.00 000 879 0e2 8.37 829 378 375 003 0.00 000 aW aoo 0.0o 000 0.DO ON coo 3005 90.90 0.38 00o OVERALL Fitration Barn WM Norin Buller Val Wth 15527 N.55 71 22 0W 000 aW 0.00 49 la 098 W.33 098 000 6131 60.33 096 0Po 0 00 a.DO 001 c00 4914 a W 49.13 49 u u.W mm 2161 aW IM27 Ba.55 11n 4914 4914 0.W 4914 4914 4914 0 W 4914 4914 1M11 8353 22.58 ON om 0W ON 000 102 102 000 000 67N 079 3149 0W OVEPALL Flotation Bain tWM Node Buller NbIIaM Will 15622 84 55 7172 0. W O.00 0 W ON 18.93 041 2001 041 0A0 2042 2001 041 000 0W ON ON 000 1893 O.BO 1393 1893 116W firs 42 5236 000 15622 G 55 7172 18.93 1893 ON 1893 1893 1893 000 1893 18.93 13722 firs 43 5279 000 ON 00o 0.00 000 0.13 013 coo 000 8281 9985 7301 0 W Loedyp ) OVERALL Filtration Bain gad North Buffer Wetland NOM 156.27 U55 7172 0W 0W 003 0W 551 OAE Ll. FimaCan Basnane N.1h Buhr We.WWcn Cana(ppm) OVERALL FllnaOon Basn rrml North Bulger We1laM NOe1n 061 t 0o l 0o o ]0 100 GO 00 0.10 0.10 010 to 043 100 043 061 100 100 043 Oda 0.10 100 043 010 am 043 OAO 1M 043 cona(ppm) OVERALL FTaOon Bain fM North Bull VJeXaM North 63 20 32 853 392 2249 14W 2l49 2749 240 5.82 240 263 20v 853 200 240 582 2a0 2a0 585 24 Cucrs(cal l OVERALL FWaEm Baan eM NMG Buffer WegaM Nm(G 2.63 2032 8.53 151 11.53 481 11.53 It 53 093 2M 093 7,63 20.32 8.53 093 093 226 093 0.92 2.25 093 Cmuce (M.) OVEMLL Frlhation Bainand North Buffer W.O..NOM 763 2032.853 0. 03 infiNate 05 the'. W n-I outlet of soli outlet 0e seamen - deeay Do low, aflow 10 aware oumow 12 total oudlow 131oud"lloeE I sm,aR moeaae 15 Asa balance cfixk Load nods n t%I Val Pill Mass Balance Teem Ot watershed in0.rvs 02 uPSVeam ne„ce Masorete 05 fiOerM a6 nomNl outlet OT SplMay outlet 09 seamen - decry OR dad.lfd- 10 ..mare auto- 12lotal outflow '3'mal haFtM to sallaRe muease 15 mass Wall Deck .ad RMuuton 1%1 Variable TSS Mass Be..- Teem 01 wale2bed mlbns 02 uMream Eewce Matilda 05 fimred W nomel outlet 07 appway outlet W seanpn - decay W lohl mm- 10 aud.ea outfiow 12 tmal oallfllna 13 toal bapped tI M.,a0e.mu,ause 15 -a.lance crock Load Reduction Pb) Vaal TP Mass Balance To,m al wateml mmwa 02 utood-cewee 03 mfinrate Oa e.en2lo 05 fiserM W pleat oWel 02 a,Hl outlet W sedlmen. decay 09 total inflow 10 sad.. oulAaw 11'l Wmow 12.it loulet- 13lotal hal la atom9e moeax 15 mass balance check Load Redonda (%1 Variable TaN Mae,, Balance TO- 01 walembed inflow 02 upaream device W iafifted. a e.M1male 05 fill.,. W noamal Hanel 07 sglWay oNkl 09 z Koren - decay W toll 10 .arts¢ outflow 11 ".. outbw 12 total nunl 13lmal lrappM 012 5.17 912 0On 528 617 0.12 a.On 000 0W Bm a00 55, O.W 551 5.51 14545 19 W 6609 0 W IW27 Re 2172 551 5.51 0 W 5.51 5.51 551 0W 551 551 IM 73 84.52 sell 000 0W 0DO 000 Ono 003 003 a00 000 9645 9997 U31 0.01 Loae lml OVERALL F.Mamn Baun mN eadd Buffer NpmM NOM 31255 16910 tqu aW 003 0W 000 124 003 tv 003 a.00 114 1.11 om 00B 0W 0W 000 0.00 12e 0 W 12e 124 31016 16799 1e217 0W 31255 169.10 14344 12e 124 a W 124 1.2e 1 N 0 W 121 124 311 M 16910 14220 0 W 0W OW 0W SW 001 001 0W aW 99.W too. 99.13 a.10 Loam(Im1 OVERALL FiRaban Bated No1109u11n ~,and; WM 78137 4R 76 We61 a.W 000 aDO 00) 2e.82 153 Wei 153 000 116.15 W61 153 000 ON a.W no, oW 74.82 o W 7461 ]a S2 61722 338.95 262.25 0 W 78137 Q2 76 3M 51 2e e2 7482 0 W 7462 ]a s2 7e62 oW 74e2 )let 205.36 421.Re 283.28 O.W OW OW 0W 0W ,is 11e O.W O.W 90.27 9972 29.14 0W Loam(Im) OVERALL F.M.- Been mM NOM Bute, We.M NoM 3 W 1 39 166 0 W 0W o.W om 115 001 014 001 ON 0W 0aa 6W oW 071 070 00, OW 0W 0W OW oW 115 0W ill 115 11B a" 0.54 0 W 305 139 166 1.15 tss ON ill 1.15 0W 0W 0W 0W 115 aw ill 1.15 169 13a 0SO 0W 0W 0.W oW 0On OW 0.W 000 ON 6202 9671 3302 0W lnadetm) OVERALL FXtahon Bean mM NoM Buffer Welland NOM 1457 6.30 022 0On 0W 0W 0W 6.m 00e 378 00e OW 0W 025 0W 0W 351 353 006 0 W 000 0W 0W 0W 6w 0 W 613 6.38 .6, 2W 210 0W 1452 6W 827 6W 638 025 613 6.38 0W 0W 0W 0W 6m 025 813 6.m 6t8 B.W 2.14 0.W 334 iN 3.34 3.0 027 ON 027 263 20.32 8.53 027 022 aW 027 027 ON 027 Coal (Pole) OVFBALL Foil Basin rM NNfi Rude WemM NorM 1526 4064 17M Om 075 029 075 075 0m 015 0OR 15M w6t 1206 0w 0w 015 0.C6 0W 015 am Corvs tpMO OVERALL Fibapan Basn3M North Bu(kr WemM Noeti 36. to 101 59 Q W 597 4311 20 e1 43.11 4311 31% ON 3W 38.14 10, 59 a W 366 366 894 3W 365 890 3W Co- of OVERALL Flmaboa Bann 3M Nonh Butler WemM NOM 015 033 0W 009 0W ale 026 0.01 001 001 026 0W 013 0W 015 033 0.20 0 W 0 W 001 0.13 0 W 00, 001 0W 001 0.13 0W Conn tgml OVERALL Filtration Bean and North Bumr WemM Nods 071 15, 00 051 iN 091 12e 0W 0W 0W iN 031 023 031 071 151 0.SO 03, 031 oW 0T3 031 0W BW 031 ON 073 031 PS Uman C.khor Mode, Version 3.4 Case 19MU12 LekaLury_WNIaMFAST_C 180324. FlrstDate Tdle Lake Luuy LaslDafe PrecFile map4wil.pW Evans PanRle dury5o.p0p TonHra Run One 0"1116 0110191 PreupQn) 50-4 1031R2 Rai 4Qx 134 S mpl in) 9.67 two Tomi 1,88 Max SOrMal Temperature pdeg-0 SngwMed Temperal(dag-0 Smendeft Cost(INdegF-Day) Soil Freeze Temp ple¢Fl Srwwmed Ahnraction Floor EvapsTrans. Calfernion Factor Growing Season Span Month Grating Season Ere Month SDay Areceden Rnnfall♦ Rur1o6 drain ) CN Antecedent Moinure Oondmi Grazing Season NonGrowing Season WnarMM Dope 320 320 0.06 MS 1. W 1.00 5 10 AM0.11 140 05D AMC -III 2 10 110 WNxNed Name P-2 ! 8 No land Distur5ance) Runoff to Dewce Welland East Bull Infihrnlon to Device Watershed Ate. 025 Wei Easl 093 SCS Curve Numher(Pensous) Soak Factor for PeMous Runoff Load ndaeolly Connected lmpery Fraction 81 83 1 0 0356 0 UnSwept Impid s.a F.C. UnSwept Depressed Storage (inches) Un6wepp ldffi Runoff Conifinent UnSeNd Sone Fai for Padine Loads 0 0 1829 0.02 0 1 1 0 1 1 0 Swept lmpervlous Fraction Swept Depressmrl Storage (Inches) Swept Impen Rumaff Condit Swept Scale Factor for Per.le Loads Sweeping Fonder, Sweating Efficom, Sweeping Stan See (MMOD) Sweeping Stop Data (MMDD) 0 0 0.02 002 1 1 1 1 0 0 1 1 101 101 1231 1231 e Uara e Name e Type uen Outln al Dudes ay outlet k Removn Scale Facer dEevatwn(ff) n Area (acres) silem Pool Area (acres) Inert Pool Volume Pi ft) Poole ill Rose (matt) Poor A.(acre.) Pool arid Rate (ii Infi118asin ode Fraction (%) 100 Creamion Pond Outlet Paramelera Outlet Type Outlet OOfum Do metier om Orifice Drs@arge Ooef Outlet Wen Length (n) Mir Diecharge Ooef Performed Rear neght (Ip Numider of Hales in Rieer Holes Diameter Flood Pool Dram Time (hm) NONE Swale Parameters Length of Flow Path )fi) Slope of Flom Par % Eul WMtn m) &de Slope (n-v/n-n) Maximum Depth of Flee, (n) Mannmgs n Commem HydraW¢ Modm t5 20 15 0 001 0 001 0.24 o Pipe. seiner. Npulfer Parameter Hydraulic Res Time)hrs) Parade D.I. Panache FYe nury5D.p8p Pearl Clan P0% P10% P30% P50% P8o% Flffimn EfAoency(%) Someng Velacay lM1T0 Film Outer Decay Rate(3iday) and Diner Decay(1/day Pon) 90 1Do 100 100 100 0 003 03 15 15 0 0 0 0 0 0 0 0 0 0 Impetuous Runoff Cane (ppm) Pd.a Ronal Co. hp,den, Pernwn Care, Egwrenl Accent Rate (Rowe y) Particle Removal Rate D/day) Wasson CceFitiem Mah.w Eiponam Sweeper Effiaen, 1 0 0 0 0 1 100 100 100 200 0 1 1 1 1 0 125 175 195 35 0 025 025 025 025 o 20 20 20 20 0 2 2 2 2 D 0 0 5 15 water Ouaaly Component Data tComgmant Name i TSS TP TRN cu PB Ceara, Creem(polo) Level5 0025 2 2 002 5 O1 Levd2 10 005 1 0W48 0014 00362 02 Leve13 20 0.1 0.5 0.02 015 038 1 COMeM Scale Faclm 1 1 1 1 1 1 1 1 1 1 1 1 11 Padkle Compovlron (molk9) PO% 0 99000 feD 13600 2000 6a0000 25MOD PtOq 1000010 3850 150.'S] 340 180 16W 22500 P30% 10(i 3850 I 150W 340 180 18D0 22500 P50% 103Do00 Saw 150W 340 180 1600 22500 Pao% 1000()00 0 0 US ts0 0 20500 PS Orban Catchment Model Vere. 3 L Run Dale 03al/16 Lase 193603a12 LakeLucy_WetIaMEAST C_1603240c FkatDate 01/01gt Pretip(n) 50/ TAk Lake Lury L.MDale 1b31R2 Rain) 4076 Pret ilk msp W69.pcp Events 134 Stan(.) 962 PahFik nury50.a, TotalMts 16M0 TotalYS 1.66 Mass Balances 0y Vana0le Valuable Flmv Mass Balance Tenn Ol watershed inflows 02.,t,.am 0eN¢ 03 mhnmte W odhome O6 neutral outlet W slaw., outlet 09 mtalm0ow 10 aurNte oumOw 12 lots outflow la storage increase 15 mass Oweros 1. Loan Reeunlon 1%r Valletta PO% Mass Balance Term Ot wmersheo allows 02 upstream eery 031afiM1rale Da e,llrate 05 Its. SO .total out41 07 spnlwa, twlel IN total mflaw, 10 sunace outflow 12 total ou0bn 13 total tmp[40 14 storage merit 15 mass balance N,I Loan Rebucllon (%) Vanable910% Mass Balance Term 01 watershee inlbws 02 upstream device 03 mfilrate 05 fineree DO normal rural DT smlMay..Wl 06 semmen . corky 0910 al stow 10 sudauk ouMow 12 total outflow 13 total rNoar 1A atore9e inoreaae 15 m2ss balance che. Load Reduction (%) Vance P30% Mass Bala.¢ Term 01 watershed Inflows 02 upsteam Ne 03 infilrate 05 filtered O6 normal oulkl 07 spilMay oNlel oe sedrueo . dark, 09laalmlrw 1D setback 0ullow 12loual rm(mw B lots, u.,,a,d to storage muease 15 pass balan« flier, Load RM..- (%) Vatyge Ps0% Mass Balance Tenn 01 waters'. Inflows Flow ac-h OVERALL Ward Easl Buffer Flner Swale Mrlknd East 103 025 0DO 070 ON 000 025 0.25 000 Coo 0.17 aSO 0.00 Goo 0.17 0DO 000 coo O.Do 000 103 024 007 103 103 025 0.25 103 103 025 025 1.03 103 025 0.25 1.03 0.00 Coo aDO O.DO 000 Coo 0DO a0O 000 000 aDO a00 Loads(bsl OVERALL'elued East Buffer Fryer Swale VkhAland East 068 058 000 Om 000 000 069 025 000 001 047 0.00 on 000 005 am 043 001 012 000 000 001 0.DO 0DO 025 0.66 020 025 068 068 062 0.25 025 0.57 025 025 025 067 025 025 043 001 aQ 0.DO coo 0.00 0SO 0DO 000 000 0D0 0SO 0310 119 6274 0SO Loaeslbs) OVERALL pIWne East Buller Miter Swale WeIWM East 511 541 0SO 0SO 000 ON 4N 113 000 00, 055 0SO O59 aloe 055 0DO 000 0D0 000 0D0 113 4.93 113 113 369 039 331 000 541 5.1 4N 113 1.13 699 I13 113 113 499 113 113 429 043 3Be 000 ON DOO coo D.DO 000 000 0.00 000 79.ta 792 7739 00O LoadsOM) OVERALL kttand EaM Buffer Fler Swale Mt.. East 501 501 0.00 0D0 coo 0D0 3B1 035 Coo 002 005 000 008 002 0.05 0DO 000 003 000 a.SO 035 358 035 035 499 1 78 321 O0D 541 5.1 361 035 035 351 0.35 035 035 361 035 035 5D7 161 326 000 ON 000 0SO 003 0DO ON 0DO 0m 9359 3336 W35 002 LIta0511tk) OVERALL Mkn0 Ea. Buffer Filter Swale VMIIato East 541 541 0DO 0SO OVERALL'etlaM East Buffer FiXer Swale Mtland East Cona(ppm) OVERALL'e1bM East Buller Fiber Swale VMOand East 024 1.00 100 037 1.00 100 010 010 1 00 009 100 1GO 0 09 024 1 00 1 00 009 009 0.99 0.32 0.09 009 099 037 009 cony(Wall OVERALL gkrd East Buffer FIAer Swale MIIane East 1 93 ] 98 )a5 1Be a80 118 480 040 750 5.58 040 193 798 745 040 040 735 168 040 Oa0 7.35 168 040 Conn Ippnl OVERALLkIMM East Buffer Fiber Swale VMband Easl 193 ) 98 539 051 273 01l 223 012 5.at 172 012 193 ] 88 539 012 012 532 D52 012 012 532 052 012 Conks (,au OV Vff1aM East Buffer FiXer Swale Market. East 193 7 9a 02 upstream fro x 03 innnrale 05 flaemd 66 nwnal oNkt 07 epAlxay outlet 08 seaimen. dewy 09 nall nlaw 10 surtare outflow 121UaloNflcw 13 total mrfl ea la storage Inaease 15 mass balance Ohara Load RMucton (%) Variable P80% Mass Bala ion Term 01 walersllea e6 02 meaream deuce 03 arlatme 05 Marra! W normal omlel m spmway omen 08 5eaimen I dewy 09 mtallntbw 10 sinew..Me 12 inner outflow 13 total 0eppea la nom,e increase 15 mass Manes metl Lora Reduction 1%I Vanade T53 Mass Balance Tenn 01 welimme ] mfl. 02 upslleam deaw 03 mliftn le 05 fiaemd 06 normal umi l 07 spu en,.inlet 00 sedlmen. decay 091otallneow 10 Surname mufflow 12 lolal ouUNM 13 total IrappM is smra9e mPease 15 mass baanm neck Load Reduction (%) Vanade-.TP Mass Balance Term Ot wale ueeall- 02 upstream da. 03lnfiNal¢ w enflnram 05 fiaemd Of nomal outlet OT spillway omat ae seaimen. dewy 09 ormu inflow to surface outflow 121.1 om0aw 13 total m,,wj 11 fluage increase 15 mass t al3nw Uea Load Redu..m (%) Vanade MN Mass Me- Ot waler511M inflow, 02 upstream drroaw 03 mfin2le 04 a rlklne 05 fifleree M normal outlet 07 spio,ey oW, ae deem en. dewy 091mal inflow 10 sueace outlaw 000 00a 1W 000 000 Oat 0.01 000 002 0.01 001 000 coo 001 0W 000 ON 19e 006 0as 538 345 1.89 coo 541 541 T% 006 008 IN 006 0as 006 1M 0.05 0as 535 346 189 000 000 000 000 0ao Ono 000 0o0 0.00 IS 6301 96.Ba 001 L.w ma.) OVERALLland Earl Buffer Filter Swats WetWM Eral 1083 1083 000 000 000 0.00 072 000 000 0w 000 0ao 000 on 000 0.00 000 000 000 000 000 022 000 00O 1082 1011 072 0ao 1083 1083 072 0a0 000 072 0.00 a 0.00 0 72 Goo coo 1083 ton 072 000 0.00 ON 000 0ao 000 000 oaa 00B 9998 93.36 9965 060 Loaas(IM) OVERALL MIane East Builtt Fimr swale Velum ENI 2707 n07 0DO 000 coo coo 1127 1.5e coo 0.08 0.61 0c0 069 008 061 000 000 On 000 000 1 50 41.16 1 54 1 5a 24e4 15.72 9.12 goo 27.07 2207 1127 130 15a 1127 15a 150 154 1127 154 15a 25.53 1580 973 000 000 000 000 000 0.00 0.00 Boo 000 94 31 50.3T 86U 001 L..u(IM) OVERALLMIand Earl Buller FXer5w.W Wetland East 013 013 aW 000 ooa 0Ba all 003 00a 0aa 005 0.00 o.an 0oa 000 0ao 005 000 0w 000 000 0.00 ON 060 003 0.11 0.03 003 005 002 003 0DO 0.13 013 Oil 0.03 003 0.11 003 003 003 a.11 003 003 010 002 0c8 000 000 000 0110 B.OB 000 000 0ao 0a0 90.33 1752 71 36 000 Loadsflit OVERALL MMM East Buller Filer Swale ~Imd E. 065 0.85 coo 0.00 oaa 0oB 0% 017 0.00 0.01 029 00O oaa 0DO 003 0a0 OP 0.01 026 0.00 000 001 000 0ao 0.17 055 C.ta 0.17 021 ON 013 0a0 065 065 0.% 0.11 0.17 am 017 017 292 0.09 115 001 1 15 002 395 030 002 193 798 292 002 002 288 009 002 002 Zee 009 002 can. cppom OVERALL kI4M Easl Buffer FXer Swale Wellomm Easl 3M 15% 107 ODD 035 ON 035 000 1as 001 000 3W 15M IOr 0.00 000 loft 0.N 000 000 1Ab 000 coo Coo.lppm) OVER UwfleM E. Buffer 'Am, Swale VRuana Eau 9% 3991 16.8 227 903 131 903 0.55 1698 T S9 0.55 966 3991 16" 055 055 1661 2W 0.55 a55 1661 230 ass Doom (Wom OVERALL'eflana EaSl Buffer Flryer Swale Vktland E.. 005 019 016 005 013 010 001 Dal 0.13 Om D16 013 001 005 0.19 0.16 001 001 015 0.M 001 001 0.16 0.05 0.01 Communion) OVERALL MWM EaI Boller Fifter Swale N land East 023 0 % 084 028 073 0622 0as 0as 073 0a6 oaa DTI am 023 0M O.Ba a am 083 028 000 12 total oN6aw 13 total va(pea 1a storage ineRd3¢ 15 mass balance check LoeU Reeurnoo (%) Vanaae CO Mass Balance Term 01 watersh d.flows 02 cp3Veam eevee 03 mfinrele 05 finereo W normal huller m spi1w., cut. Oe se0lmen .chewy 09 total inflow 10 sumac, a.m. 12 later otol 13 total traNN +..sage -ease 15 ma,5 balance check LOM Redaction t%I Venable PE, Mass Balance T.. Ol walershed roll. 02 upstream deuce 03.aN., 04 efinleas 05lkerel 06 a.rmal.Nkl or spkway.told W sedrmen I decay 091aa1 mMw 10 sudere oullbw 1210m hur6Pv 13 anal Vapped 14 Waage aKrease 15 mass huff,. check Load R,du.a t%) Venable ZN Mass Balance Term Bl watershed in6ow5 02 upstream oewce 03 infiltrate a ek6nrate 05 finerea O6 normal aarwt 07 spillway oNkr W sedeaen. decay O9 taalmflow 10 rumaw hamaw 12 late ou1Mw 13 total trapGed 14 storage inrleare 15 mass balance toed Load Redamon r%) Valuable NC Mass Balance Term 01 watershM arf. 02 hlsaeam de.;ce 03 infiltrate b4 e.finrate 05 filtered W nomldl oNkl o] sppMay oOlkl 0e sedimen. dewy 091olalinflow tO suncee ouMow 12 total.011ow 13 valor barred 14 storage iarcOase 15 mass balance Mad Load Reducaon (%) 0 n 0.56 0.19 0.19 048 009 039 000 coo 000 O.00 000 coo 000 ON ON 7337 1387 69.15 O.CO Laaaslos) OVERALL'etknd East Buffer Fner 6wak VJeIIaM East 002 0.02 0.00 ON 0.00 000 001 000 000 000 0.01 0m 000 0.00 oats um 0.01 a.06 0.01 am 0Oo 000 0.00 0.w 00o 001 Om 000 001 001 0M oW 002 002 0.01 000 000 001 aoo 00a Om 0.01 0DO 0 00 001 0.01 001 a 00 000 0.00 aoo ash 0oh 000 aoo O.00 7669 29.75 6973 000 LOads(10s) OVERALL Hkril East Buffn Fmer Break MOON Earl 001 0.01 000 aoo 000 000 0GO aDO 000 00O a00 am 000 ON 000 000 000 00O 00O aDO 000 0.00 aoo oats 000 ON aDO 0.00 0Oo 0.0o aoo oats 001 0.01 ao6 000 00O 000 0 0O a00 0aa 0w aoo 0a0 00t 0.00 0OD 0OO 0W 0OO 0 0O a06 0aa 000 aoo 0ao 8752 4592 2695 000 Lea05(ter) OVERALL MNnd East Buffer Finer Sseak WeoaM East 046 046 006 0w coo 000 045 016 coo out aw aoo 000 00O 003 0DO 028 001 0.27 0DO oaa 00, aoo 000 016 044 0.13 Ot6 002 0DI 00, a.00 046 046 045 016 016 0.45 0.16 0.16 016 045 0.16 0.16 030 0.01 O.R a 000 0aa 0DO 0DO coo 000 0DO 000 U65 310 63.W 000 Laadsffts) OVERALL'etbnd East Buffer Finer Swak NMyM East 079 078 006 000 000 0.00 042 a.10 000 000 0.13 0 00 000 Goo 0.01 0.00 0.12 0,09 0.12 000 000 001 0m oM 010 oat 009 0.10 0m 035 021 O.M 078 078 042 010 0.10 042 0.10 0.10 0.10 042 010 0.10 068 036 0.32 0.00 coo 000 0.00 0.0O 000 0.00 0oa 000 8752 4592 7695 0.00 O.W 0.83 026 aa6 Charts tppml OVERALL'e11. East Buffer Finer Swak KEtIaM Eur. 001 003 002 001 002 001 O.DO 0.00 002 000 002 002 000 001 DOD 002 000 000 002 0.01 0.00 000 002 001 000 Cana 1ppan) OVERALL... E. Buffer Fmer 6wak Wetland East oaa 001 001 Oo0 000 coo 000 oaa 000 0.00 0.01 0.00 oats 0ao 001 001 Oaa 000 0o0 000 0DO oats aoo coo 0ao Conn horn) OVERALLN6rN East Buffer Faer Swak Wetland East 016 068 067 024 065 064 Dos ON 065 006 067 065 0a6 016 068 067 006 006 066 0.24 0W 0.06 0.66 024 006 Conn gra ) OVERALL*%aaj East Buffer FOer Swale Welland East 028 115 063 014 045 028 003 003 045 am 063 042 003 028 115 063 003 003 062 014 003 003 0B2 0.14 003 P8 Urban Oatcnmew Model Version 3 a Case 19MOU12_LakeLucy_POND_C 160324.Pec FlratDde Tale Lake Lucy LaslDale PrecFile msP 4989 pcp Events Earl nury500, To lMrs Run Dale OM1/16 01,0191 Predp(in) wA 1WL72 Rain(in) 6076 134 Slma(m) 967 16440 TodlYre 1 M Max Snondaa Temmarture(Oeg-0 SnowMeft Tempelalum del SnowmeB Coal(In/d,egF-Day) Sod Freeze Temp(de,-F) Snovi Abstracter Factor Evr, nTrans. Calairatmn F.R., Growing Season Stan Month Growing treason End Month SDay PMecenenl RaiMdll - Runoff (mcnee CN'Valar end Moisture CmOnm Grcweg Season NorGrowmg Season wmrallea Data 320 320 005 32.0 1 00 1 00 5 10 PMC-II 140 0 50 AMC -III 210 1.10 Watershed Name P-1 Pd P-5 0S1 PA Runer to Devoe Infiltrate to Deece Walersned Area Sohn POrb Fdttri Basin Fdlratan Basin 3oNn Pond Final, Basin 245 0% 033 0.94 061 SCS Curve NUmber(Pervious) Scale Factor for Pempus RunOR Load InOrMly Connected, lmpery Fraction 82 81 81 79 81 1 1 1 0 1 G2829 0 0 0 03 Untrweg lwpariaus Frxiun Unwept cep..Storage) nes) Unwept Iri Ronne Coati UnSwept Scale Factor for Pu le-R.dI 0 05625 05545 03511 0 002 002 002 0 002 1 1 1 1 0 t 1 1 1 p 1 1 Sw,Ilrn,rvmus Fraction Swept Depression Storage (mcnes) Swepl Impel Runoff Ccefiuent Swepl Scale Factor for Pantie LOaOs Sweeping Frepuen, Sweeping ERiaenry Sweeping Skin Dale Will Swaepug Slop Date(MMDD) 0 0 0 0 03 002 002 002 002 002 1 1 1 1 1 I 1 1 1 1 0 0 a 0 05 I 1 1 1 1 Ipt 101 101 101 101 1231 1231 -231 1231 1231 1Dm s New s Type Lion owes d 0" w Cwel e Remaval Scale Factor n Elevation (n) I Area (acres) Imm P. Area (acres) anent Pool Volume (aoR PODI m6tl Rise (in/hr) Pool Area laves) Pool volume (al Pool Laid Rale i nN Infix Elmon void Finalon I%) Cool Pond Oullet Parameere OWel Typo Oullel Once Diameter lint Once Olecnarge Coal 0010 Wert Length (fl) Wen Ddcharge Cue/ PetlOraled Rue, Fri (a) NumMr of Holes In Rker Huks Diameter Food Pool Oran T me Inn) ORIFICE ORIFICE 12 24 06 06 Swale Parameters Length of Flory Pan (a) Slope of Fkw Path % Dpnom Watn 00 sore Soce (ft-yma) MaRmum cea6 01 Flo., (n) Mannmgs o Constam Hydraulic Model Pipe Saner AOmfer Parameter HydraWR Res Time mn, PaNck Do. Parlck FJe nurlOP Fall Claee FOR, P10% P30% Fri PBD16 Fi"..an"C y[ie) lottat9 Vebc"a/I10 Frtet Order Decay Rare (I (day) 2ro order Daody(Itday-opm) SO 100 t00 t00 0 003 03 15 C 0 0 0 0 0 0 0 lmpernous Rurwa Oadindpm) Pemous Rome Cory, M) PernouS CWC Command Accum Rae nbe-acdal PaatCk Remowl Rae D rday) Waslma Craft. Moral Fgmi 9aeeper Efnuenq 1 0 0 0 1 tw tw t00 12W 0 I t 1 0 1]5 1 ]5 1 i 5 a 025 025 025 0 n 20 20 0 2 2 2 2 0 0 C 1 5 15 Weser OwMy CanpwteN Daa �Dortpdnare wale � _-_Tss TP Tlw w PR era He (wm) =Leyel l s 1o25 2 z 00z 5 at 2 16 005 1 0wa6 0014 00i 05 L.13 20 bl ns nor n15 Cu 1 COM¢M Soak Fanor 1 1 1 1 1 1 Panck COmpmemad (Mg/k9) Po% 0 991 KWOC 136w 3I100 6awCo 2500w P10% 1030w0 38W 15000 3a0 180 1w0 22500 P30% 10000w 38w 15000 3a0 t80 16w 22500 PW% lOJww 38K 15000 340 160 1600 22500 P80% Icl 0 0 3a0 150 0 22500 M Ur6dn Oalcnment Mocal Version 34 Run Date OM1116 Case 19MOU12_lakeLucy_POND C 150324.p6C FIr.Date 01101Ot Precip(m) 50.4 Tak yke Lury Lasi 1MI92 Rai 40 76 PrwFole ., 4M9pcp Erems 134 Snov/lal) 967 PartFik mTW pap T.laWrs IWO Tolahria 100 Mass Balances by Varable Variable Floc Mass Balance Term 01 watesned meows 02 upstream dewce 03 infiords 04 efinrete 00 normal .Niel 09imal Inflow 10 e.ifime ou . 12 total ouni 14 storage Increase 15 mass balance check Load Reduttan (%) Variable P)% Mail Bale. Term 01 watershed inflows 02 uW..m deuce 03 air ate oa eulnrate 05 filtered 06 normal oNkl 09 idol mflw 10 wrlace ouM.w 12 RAW Wfl. 13 idal trapped 14 storage increase 15 mass balance cheek Load Reduction (%) VdN01e Pta% Mass Balance Tenn 01 watermea inflows 02 upstream dew. 031mims. 05 4nered a6 normal own 06 seeman I decay 09 ideal inflow 10 wdace oureow 12ldal puMOM 13Iol.1Im,,pep 14..., maedse 15 mass baance check Load Reduction (%1 Venable P - Mass Balance Term 01 watershed Inflows 02 mammon deuce 03 mfinrdte 05 filtered 08 sommen • decay 09 trial nflow is w inn, Pumow 12 Bea1.u@Tw 13 total trapped 14 storage increase 15 mass de ance check Load RW..n (%) Variable P M Mass Balance Tenn 01 watershed in6yxs 02 upstream deww 03 mfiNate OS filtered Flow acfl OVERALL Finrati0n Basm SO0O Pond 686 357 311 0ad 0.o0 362 000 3.19 0a0 00a 3.19 060 673 042 673 668 357 673 673 362 673 623 362 673 000 0.00 0aa -0 05 -0 05 0.00 000 0W am Loads(IM) OVERALL Filmation Basin Smeh Pond 16.16 971 645 000 0110 197 0m 8W ooa Duo 066 aW t 74 9.74 000 873 111 873 1616 971 842 873 197 873 873 197 8 73 774 774 000 -031 000 431 a 060 0Old 47W 2970 000 Loads(Ws) OVERALL F,M.t..n Basin SDNII Pond 24106 IN% SOOT 0.00 0.00 1610 0.00 14040 000 14040 14040 coo 2575 1610 2575 7406 3364 4042 241.% IN% %1T 2575 16.10 2575 2575 16.10 2575 214 46 124 04 4042 0a0 01m 000 085 085 000 88 95 91.12 61.OB Ldads(Ws) OVERALL Flnralion Basin SwM Pond 241.06 190.% 50.07 aW 00o 1163 0 CU 54.01 a 00 54.04 54.Oa 000 1474 1163 1474 172.22 12527 46.95 24165 IN% 6169 1474 1163 1474 1474 1163 1474 2M.26 179.31 46.95 000 Om 0.00 005 0% 000 93 86 93 66 76.11 Loads(Ws) OVERALL Floridian Basin Soulh Pond 240.59 130.52 W 07 0.0O 0.0d 562 0 d0 14 M 060 1480 14.80 000 OVERALL Flltralion Basin SONb Pond Cons(,.) OVERALL FlllraliM Basin Scan Pond 089 W 076 0M c 99 6 16 0 8 0 % 048 089 1a9 046 048 0M 040 048 020 048 Conics(apm) OVERALL FiNation Be. SOWti Pond 1327 1967 592 16 1617 14t 13M 141 1327 1967 362 141 1.Be 141 141 16a 141 Coics(pprol OVERALL Filtration Basin Scup Pond 1327 1967 5.92 1 18 623 0.81 1007 081 132 1967 337 001 118 O.at 081 118 081 COncs(W.) OVERALL Finrdlion ease S.Nh Pond 13M 1962 592 057 1 ]0 4 r 1 06 normal.,diet 08 seamen I decay 09lo al inPOw 10 surface out0w 121na1 ou01on 13 teal lm,W 14..rage mcrease 15 mass balance check Load Redudtn (%) Variable P80% Ms. BdWnCe Term Ot wWddsded mR s 02 upstream deuce 03 nMe2te 05 fillerM 05 rKKmal aisle, W SMiman I decay 09 taal inflow 10 surface M. 12 tdal.Nrgw 13 meal trapped 14 Manage increase 15 mass balance check Load Redunan (%) Vawble. T65 Mass Balance Term 01 watershed mMNs 02 up.ream dewce 03 iMlryrale 05 filtered W normal oNIH W sedlmen . decay 09 Mel mv. 10 surface.utflow 121Mal Outflow 13 local trapped 14 Morage Increase 15 mass islands check Load Reductwn (%) Variable To Mass Balance Term at watershed inflows 02 upsream dewce 031nfibee 04 eAh.e 05 fitteed W normal coal W social en - decay 091Nalmflow 10 sunace.inflow 1210.1 autlbw 13 total trapped l4 gouge mordes e 15 mass balance check Load Redugbn (%) Vaiable. TKN Mass Balance Term O1 watershed lnfgxs 02 upe.m deuce 03 mMate 04 e.finrate 05 filtered O6 nomal aulal W udlmen . deoy 09 tmal mflow to surface oNSGw 12 toal arm. Blade napped 14 Morage mcrease 15 mass balance check Load Redunan (%) 601 562 601 219T) 170W 4968 24069 1W 52 6669 6.01 562 601 6.01 562 6.01 234.57 184.89 4960 000 0W 0W 001 001 000 97.50 9204 8921 Loads(ms( OVERA Fillra..a Basin SONG Pond 479.31 37a 21 1W 14 0W aW 215 0W 326 OW 326 326 oW 137 2.15 1.37 47471 37379 1W 92 47934 37921 10229 1 37 2.15 1 37 1.37 2.15 1 32 47797 3T05 1W.92 0W 0W 0W 0W 0W 0W 9971 W43 W66 Loa6s(ms) OVERALL Filtration Balm South Pond 120205 951.71 250.34 0W 0.W 3550 0.W 242.50 0W 212.50 212.W 000 42.0] 35.50 4787 MID 76 70229 237.97 120205 95171 285.84 4701 3550 47.87 4707 3550 4787 1153.26 915.29 23797 0W 000 0W 093 093 0W 95.94 96.12 0325 Loads(lbs) OVERALL Fiaration Basin south Pond 438 3.17 1 Y 0W 000 032 00O 1fi6 003 0W 009 OW 152 157 0 W 1 U4 024 1 04 129 122 053 4.38 317 154 104 032 104 104 032 104 332 284 053 _0 03 OW 0 03 0W 0W 0W 76.01 0967 U25 LOads(MS( OVERALL Filtration Basin SONh Pond 20u 1441 6.12 OW 0W 168 0W 830 0W 0DO 052 0W T]8 778 0W 594 tat] 5.94 699 493 2W 2054 1441 781 594 ISO 59e 594 168 5.94 14A 1272 2.W _019 0 00 _019 0.01 001 0 W 7193 8023 26.34 0 33 486 am 1325 1952 304 033 0.57 033 a 0.57 033 OorcsOpm) OVERPLL Petri Basin SONn Pond M 39 39 W 11.84 0 22 0 38 007 106 002 26.39 39 W 5.59 007 022 007 002 022 007 Concs(ppm) OVERALL I'MraLm Basin 6 iAh Pond 6610 W 03 2961 361 24 48 262 3073 262 6618 98.03 15.63 262 361 262 262 361 262 Ccncs(ppmt OVERALL Filtration Basin SONh Pond 024 033 014 003 019 001 0 W 0.21 am 024 033 008 a06 am 0W 0W OW 0% Co. (ppml OVERALL Fatalivl Basel Solah Pond 113 148 0n 017 0% 0 06 032 101 032 1.13 148 043 0.82 0.19 0.32 032 0.17 032 Variable oU LOadilms) Conce(ppm) ® Stantec Stontec Consulting Services Inc. 2335 Highway 36 West, St. Paul MN 55113-3819 Phone: (651) 636-4600 Fax: (651) 636-1311 RECEIVwks ED SEn MAR 2 � zu1 I �H�rI�sSFNPNNatr�GDE�' Transmittal To: Robert Generous From: Ryan Mielke Company: City of Chanhassen A For Your Information Address: 7700 Market Blvd. For Your Approval PO Box 147 0 For Your Review Chanahssen, MN 55317 ID As Requested Phone: Date: March 27. 2017 File: Revised Landscape Plans 3-24-17 Delivery: Courier Reference: Attachment: Reference Confirmation of receipt: _ (signature) Copies Doc Date Pages Description 2 3-24-2017 1 Anthem on the Park Sheet 11.01 R 22x34 2 3-24-2017 1 Anthem on the Park Sheet 1-1.01 R 22x34 On behalf of Yosemite Holding LLC, the plan changes are pursuant to agreement between Doren Larberee at Lan -De -Con and Jill Sinclair, the Environmental Resources Specialist at the City of Chanhassen. Thank You, STANTEC CONSULTING SERVICES INC. Ryan Mielke Design Technician Phone: (651) 604-4931 Fax: (651) 636-1311 Ryan. Mielke@stantec.com Cc: Terry Forbord, Doren Loberee Design with commur ty In mind mrV\1938\achce\193W3412\communicalions\correspontlence\lonosoape plan¢han fflol 3-24-17, o X YOSEMITE HOLDINGS, LLC LAKE LUCY CHANHASSEN, MN WCINRY MAP INDEX OF DRAWINGS DDm cvelBBNEET HEPN W,P! IEUEM/W MBPENnTCNB M01 NTNI JEI IAW TIIIE &IRVFY Qr1L DD.D.OLB VIM' rnEa PEuovuB aLNrl D. BBa rrreurDM+ DID TEuD1 mM m nI.BT ¢wBNrvlPDemu AND eEDdExr mrnna Dl.MI ¢o, aEnDlnD vv.N uo, NMIMrBEWEN/.NDwnrr PNnM RnN 0o1 m MBEWERMN ¢d v DP®.N aMNrMEN TnNDDDETNLB ¢m QIr Oi CIMMVA9EN ATI.NOnPDOEINLB ¢m D OFDNA..WEN Bi,NDnBDDETNLB dd CT'OVOMNMBBBEN BTM'DnPO L£iNL9 pIANI RP111ECIMF L 1.o1 IIg0.AN ud vuxrnm DErnBs PROJECT DIRECTORY ae' voeEBlDE rulnelDe. uc 1fRRV PpIKAD. PLMI:NN nKOBUmEY R.YfE eNaPlwmo. Mx. mo. %LOJICf WINDlN.V9 LhL IXOMEfIr. rt.LMlEccoxMlLrea elNvseB iuc. rNwEn NIBBEwEvrl,ma Dae Nmav�rdwEm rt.vnln. uumnD R(Nl0.MMl1EVNT.W IEGCOM TEi'. dran+eeq ENx mlann vDnecBPl McxllEn: rtwmc coreuTmD eeBar¢e Inn Mac N.N mexNNmraNrdwsrt er vun, uNse,lD Mwc.vunuNpsrumc.cw m: dr.lM+dB. nBx dlmmn STANTEC PROJECT NO: IMMU12 V d C 41 tA tA G 3d'���8•�'AaA�n��.: E E ♦�.�.e�e ®a.g3..apaa IIIIIIIIIIIIIIIIIIIIIII$� � gaE � ��y � � 13� $$YEERSYY R E TT I:g G IIIIIIIIIIIIIilllllll�� � ��3�3E @ � _: �� $&BESESYEEEYSRR���g evEE zzzz .ol ' ill lL Ll i III IIII i�i 'fq �CC Sc7, , lvl III Iv I�iI •l.l IIII I I @ ,S 2 $RR I }il� 8iR i I ilv vl lv{I p I el IIII l .� ilia IIII ill Ili IIII i i�'ill I G 3F3id.;'vf�'3����..a�r�g3c-g�a2g3a�R���869P^��$s o 1:1�1 YOSFMRE HOLDINGS LLC I (�1 Stantec g( 4 UKE LUCT ROAD. CHANHASSBd. MN �� � ! S i i 3 � � � � • � �ouo rs.uvuimrs e ................... - .......... ....----- _... ------- .....I ii5i IMI i if 1555 if III Il55f5IM0 if fill Iil I"Ef 5i55 i5 l I if iE§IiMI§§I'L5l§iMIS if ill i5 If If if if I I i l 5I15 if F EE E"xEEFEFEEE°EEEEEE°!!!EEEEEE EEEE EE E IEFFE ME !EEE'IV E EE ME IEEE III IZIE'E.[III III EEELE=E°F EE EE EEEE IF E E III, <«t«<i<«iIIpit{i(lii({{{{{{({{i{ii{ilii({I{ttttts{{l{i{ �tt f I I I E ( I I I I I III[ if I [Elttti[(i[Ef[tlEt[EIItIIijj[E([I[IIII([III[til(fill [#[# fill file gp(tit(Iifif" (If I(III If[[[[fill(t[� { { { II it iiidIIIIIIIIIitIIIIIIiiAIiiiiiiilliii"E§IliiIiiII E C E CCCCCCCC C C tt t C CC CCtCCCCCCttttctc CC CC CC C GC C CL CLCCL:IcctCCCCCCC: CCCC cc C CCC CF CC G C C C C CC It t L C C CC L CC:G CGI j CF C: G I CCC L L Lc R I C I t I ai CCC CC I I I I %L:LL^CCL:CtCCCiLt:L::C^t:III I CtCLCcCC C C III CCC: I C Its CL C L CC CL:6:L'.:C ......................................... . I IMUMMUMMUM IMIMI it ilsii§ii I if if Us iiiiii il5 mii§e iilillll5l55§115i555555fIii5UMI E EEEE??EEEEEFE'EEEEEEE°EEEE EEE EEEEEE°EE tjIMEEEEEEE:E;:EI?°FEsEElEEELEEEEEEFE `tE FE "s EEEE"xEC°OEECEG I I It i l:I���IIIIII={{fiff(�Ii{�:{i{ij1i(�(ij{{{�{{{{(ijii{{z1filliI { (iEIItI[IIII[(I([[I[iIf[t[[i[[t((I[dIi(l[I[[II[jddlitiIII�=[lE[(ffilE[[tII[lIll[[i[(iiltitE[[[Id[(i(E[ s I I ssss f(f Ifll( I s f diij}iiii�`� iiliii'id'i9e...iiii..dliil3a.I:di........ L GLCC:EL CCCCLCCLCCL6LCCLCLCCCGSt::::cc CCU CCGGLf CG CL It cc cc :CCC6tC66Ci:CC2 [:LSCC6:::: LC:CCCCS::=cc CCt: cc cc cc cc C; cc cc cc cc cccccc: LCcc: tfSCIII C[CiiLLLC[CCCC:cc. LGCCYC[SC:CCGCGLG L:Ct GC CL CL CC GCC:ft.Ciii GLtCCtI 1l.................................................................................... L.--- ................. '§§liil4fiiiii55§B"s§i€§€§§IIIiIIIISI`:85§i€§li iii ii iii56lii§ii5siiiii§F§iib "s l5l§355Fi iI iiiiiiiiiiii§§§§§5iliiili IEEEEEEFEE?EFEFEEEEEEFE?EEEEEEEFEIEEEEEIIFFFE E F E EFFFEEFE ME EFF I E F"6 E E E EEEEEE EEFE???!EEEE[!??F??IE°EEEE!"s FF?!EEEEEE i Jillfill I[?I[[[IfH HEIIitIII"IILIIIlifttitIIIIIIIIIIIII(I[EIf[I"it Fiji fee I[(JeffIIiiiiLfif [LliitiilLl[[IIE[[itliiii g IIIIIIIBiliiddiiidiiiiiiIIIOff l§jldfile iidiilllliIIIfIII II1illdj[iiifIiiIiIIiiif. iid l E CCC CZ:L::::CLLCa:LLECCL000C CLC::LCLLECC:CC:::CfC:Ct::C:L::LCYC[::ct:C:S: L•::CCLGLLC CC SCCCCGGG:[CL:LG6LGLCC:G C tLG: GC[GG:GLCLC::CC:::CCCC :LCCc:::cCL :LC:GC CCCti:: LCtCGLLiiLLLLYLCCLLi:LCCL[LCSCG LLLS tCCCCLL[G[CCCCLGC ti CC YOSEM1fE HOLDINGS LLC I Stantec LAKE LLCY ROAD. CHANHASSM MN I ,affRAenttr I=— I TS n'wL YE10.IrN Au N,wexn ..sT eL AvvRovLo xr cn. i�6E x.:y,.•.�.xb ..� IYPICAI HYDRANT 4Mm,.MY. WSID -NON w. xrairvc m R1u[u1 �' 40 IOOn 1.mne4... pew n'WMb L ..w mxb Nnn. M ws w .nuw n..t x W mmna.. � w Yr IYxI �f STANDARD MANHOLE [NON[TAIHL MP A..N1 ` 2101 p. va �. YPICAL WATER ® SEANCE OIq,AE.YTD C TND[T 1005 MANHOLES"u I01�IN AND LIDSS SflNDETAIG LN4M LPIHc DLPARTNLHI " •� 2111 . ,. .1IIr:a aoY Nb .uu. bi.. 4. mrr TYPICAL GATE VALVE AND B0. INSTALUTION [NCN¢PoNG OFPPRTmDR — 1006 VIPE BEDDING IN GOOD SOILS RCP h DIP ' [xom[[mw rcaA.nnxr "" �• 2202 us �_ SANITAR• SEM4 SCRrICE CONNELDON OCTNL YUNYUY{ IV if�,µ1[[f.C,RE Y.P .•w[, ,�, —1 EyP l.-I R TYPICAL SANITARY SEMEN SEANCE [N:IXE[fiNL Cfv/JIiYENT`a 2001 1 T N + , _ 1 Mfg PIPE BEDDING FOR P.V.C. PIPE ET'GIHL'[RPp xLT.R1M[NI -- 2203 S. WARRNAIN MIRR SIM St NiR ant WATERMAIN/STORM SEWER CROSSING _ _ _ __ _ _ EN4NIEERIH4 OEPIRIMEM na. 220 CAT*BHSY ] " d11 LCAL 11 ] WIN H ouMETER AL 2 BAS N dplN[EAxGp ..' -- 3103 y r .. ''vro v.Na.rmr r,..r � PLAN r��.i wiRi"Me w���Nr v.w��i. uwM[fa x,v.wv vrw2o. .Y"ev rssr,eE_ w"v N.w.NN Auss Off 0 INSULA1 DETAIL L=pIp. WARWA Ni — , 2205 ti �5�lme t 5 -- 41 :.EC IIQN A -A n..,...w,,.. CURB CONSTBUCTM Ai CATCN BASIN [xaMUIxC RVAxna[NT r'w` 31M w xn.w"u Plp )r � sr, SFCTI N SFCTIDN l.�u�+nsn vwr.ri.. w. "• Or STORM SEWER CATCH BASIN offr TWICAL 4' DIAMETER 2' N 3' RECTANGULAR � CATCH BASIN MANHOLE ENONEERIN4 E ARDOENT wqf 3101 QROMENIN. DEP--T � c 31 wiry L7t"r:.: r ISWETRIC O I MN FLARED END SECTION IOItO I FLARED END SECTON GME[RING REiM1YCNi �� 3108 u C N r ail NneM>RMiY�s�•�Mi eM. ,1 Www.n Ym��I..�i •04~ K �C Is.YM �MNUHM e.R Cl .iREETEi SECnON any RESDENTIAL MI MINOUS Y�� DRIYEWAT ENTRANCES WITH AND WTHWT WRBS n....= ., R. DW.KEWRI ClrM1101I ""` 52M �f TTNCAL WRB AND WTMR vlclrREAI.Ic m.RIMM rr 52W CONCRETE SIDEWALK ExcREdwc mYmErvi x"x � 521a e A P �,NR tom: PAAI Y • T y QIiW RADIUS *wca+e RAdus m[[wC pvum[M 5204 Roo, RMn RAwu ea.aor .T11. R R 1RFN[N OELAM_ VRIRoI.O PVC �pQy CPE_fd151 °��R >. R I. x1.,R . .. ,IR R uim RtN T'_x, rna �R I d` SUB -SURFACE pRAINnLf [NEmFFam4 Ofvutt4Cxl �' ` 5213 SLANDARD WI, -DE -SAC .wN ,° K.EW• �A L �Mm cuL-Dr-SAC-s,Ac D.GINEFA.IG mArtRDrt —iOi 5205 fLS R1P� �*.¢0q 1µYVY iNRR.S+IN LNr4MP1) SUB -SURFACE PVC ORAINna CLEANWTS FOR INLINE AND END OF RUN CLEANWTS EMRNIcI mAM.INif —R. 52M Ili II FM+kt OIIR SILT FENCE C,4IIE MS OEwEIMFNT 5]00 ia«o «maT ._rra q'ror i J.E xort.l.c r.�l NIIUI �.'t ll END SE�IVENT IRA ip µ{ip� gull ero .. vwxc xc.RJNua . . rrp.�.Ro�' rl Ad CONSTRUCTIONCONSIRUCTION ® ENTRANCE Er.aeunC oeP.IDJnn " SBOt -uu. nx ry wlry '., *aa 11 �p¢ 1Pr4 pA([ lN. N YOVM1.Yp.M M I. � }iSi•n• x J 1%V Ur LL ClRxcw /1 m.i�M T wxPE 1 GIR OFFROAD CATCH ASH FILTER BARRIER NJvacwxc arr M. " 5M2 -01 Gk -1 pJ ^...,... _. -F .y.._.__.. ITS �"OCTJSF'4XWLZ^_'.:^'. r.� LIGHTINGROLE POLE C.E. XIIAR EM 524O IV4 K. �!w u MO�LiI/CG23 M CNN CATCH BA.. SEOIMENT TRAP iFGNrzlexG MVIrM . — r 5302A f �a[`E em®rvmw.vn ®,omarru�em' mirivn,,;�urm,nmw.a ��[� • w r. wn�xmvm sn+ nex�ow xvwunnm e ne w ae• emwe_im. . �uPx.w 4��' ��.._.a�.m w +D wxews Ee�B .aoxmwv.ww.w.x+• _. .. d • w xmvuw.nr m ���� �O�r naixwe..sx+w.iw.mn..vxwr vrnv evrwrxv var seswr rv.®uwrvv � � aa.ean.uun�rrvsew_a IYYP/d NB14RFBl1RH PL1rlIQ14 � &WIDNID RRIAR®iNH OflWfDNa 9MlAlfID TREE RIMING CN A/R RAPING N y�xirul.fMu uwx�m� sw�.ra aPRnnn v6N0�Pn_aw�OP�W�mmMA M�F � uMWn®.Np9w�[NY.PYwr P CalR'Rw �w/xrtan._x � Ouw{WSMa'�s r i�io4warwim�•ualxm. Mxwa MamCGx4Naewrv® �wwrww w��xlrtr.R�io VRROIPna OQ11fA1N6l fADWN RAP N1U lED IF9MMTldI u.aramir mPwwaawa® mCw/4RNMarte Pvsv. oe. N ®_ PPrRM1.w.06P �. w�Na.l�xFMrw PIwYxOrtuimw iNRr rmOi M RIP W mM owutl mM. x0 •waver! 4w® mwrene®iea Y Nrm.0 finelxpll YORLmxfWllwlaa APwer.uVrgrlxmefinewMlN•NNW w_.fWxrd bi Ta69alwal Wfl>tP rIMMaMNCavY Dalf.wxiPe n. ¢Pr.PPNVLYrIWme®imfCCT _M a.mwrtuR.P artwmwnsawP.� .nxxaM1xxx®aMm.wP.rt m U J YOSEMITE HOLDINGS, LLC LAKE LUCY CHANHASSEN, MN L r. PROJECT LOCATION E ±MHi of } •nHn VICINITY MAP INDEX OF DRAWINGS aERmu m uoENO RNo,weREvunorE aRNEr _ _ wm uru]iiw vino rmEEURrfv CML �eREWN.48 RAN - THE RfLL,.-RL,.,.X cl TREL w�xrom PRELYxIMY MT OI iEMNMIM1 fROelONN1O9EUMEMCdIrRCL MX pM O Ip RAN ulrefwfRRxowRifRwn vuw 1 BIORY efMER M1AV Gal pry OFCNwIWeEN..,,LETRfe cG prvnF cxwrwefx erM]owoceTRu Em a]roFcxwxueEx erFumwourRfe Ga pnaFcxuxueeEx erANnnooETRfe LRxox.LFE UEcxREciVu_ L,91 RAMTxq R.W. - ual vuxnxoonuu PROJECT DIRECTORY wEx YIAE MM➢w08, LLC F IEARV WpiO. PRWpPK WObJEBE1I C.ACE Y[IRF/AW.EIx. 6L111 PRGECT NMIbER MID C LeNRxEER. RTMIIIC CMfI 11. E.EE. MC. M]OER NLMPRREY PE. R18 DY XgNMAr M WEB ST.PMIL. MI MII] IWE0.NIMPMI WTNREC. TEL:.1Yl., FMI', 651d]FI]II VNWLIR MpI RfFML..EC C W BYLTIXO BER VICEE MC. LV`YCPIIIRIPII ET pzp11..11E FBi er. vRu, xx mil] µV1C.MMM109TM'iEC CCM TEL eelaeraml. vAc eslssl],1 STANTEC PROJECT NO: 183W3412 ciTY OF CHANHASSEN RECEIVED u 4T CHANHASSEN PLANNING DEPT 191 Y g P ..•...g 2 .!3 • pp � A ° a �i •Ill -- a R y g r ee e q YOSEMTE HOLDINGS LLC ® TKI'l LAKE LUCY ROAD. CHANHASEN. MN Stantec �',. 3ie 4i 9 oua�ae.vunw1s �.® OA I 1 �1 pm n+..ffp i 1 1 � --- N.PLA"EC eek ALTA/ACSM LAND TITLE SURVEY LT FILE NO. 531257 11 VICINITY MAP ITEMS CORRESPONDING r TO SCHEDULE�B�� - LEGEND 71 m.E.m o c— I, - . N x.musnw x.s LAND DESCRIPTION 71 .woa.wiw W rw.••i.i� r. Y.,.�.... �.. r. r.. :.... 11 SURVEY NOTES 11 CERTIFICATION h s, 1 1 I I I 1 1 r✓ !�� / 1, 1 1 SEE W SHEET C0.02 FOR REMOVE �� •�\ \ -•L- '_. __ __ �--. ^ � a (� W /• E II REMOVAL PUN 00 0. Al I J'III 1 .ewraa r ieu[imsgwr—� I ' . �� �' � ' � �� � ( �gbuolnfh'iii i •c. 31 ILL 1 � manloa• C "f`1 i I •r �tl e i �� �' i! ,I � i � i E IIWIIOMpIM. ___- "W, / � i i i /r� a111'/l.1 1 � ```• �I/ � •` AMIMlO1 1'il r\ y * ,e\\ . �I''I jII J / I�FEau,o��' _ 1 1 ��� r�•rt iawnwuse� i pe \',� � i I �__ —ter � 1 � ��.kF_dU � _ Sri•-SP i ' -�� �a ����g01M 1OY I e•`�_ � . �I �II� .hivYl� li � _ - � � I — I --- ------- -p- ..: m.mn.mv r v� I wwm o� u ry �i g�i <w n i1�9 IL . m..cw ILLR A. xruem w LEGEND LEGEND p� _ —sILL LLLLWGOII 1 < �. . eox o m.evn A.uw wu«v N o c o c[}� n, I w uuluMN.l 4J i b YY "75 � - -_ ONr" EN��R „'b o° i _ ..„tl• u„a ,w' I O�S�J � � I wowwmz (""1 mEE tu�orrroa[Rexweo )q I Uz uwnrnxiuoE IN o _I i wwalunoN � F3 ' •�uiI,eR aaxw¢ssnox,w�ltlgl. N �! W n I� • , n1EE TO REKVN O ire I •�• �vl� ._` i 510.5r nieoro. C & �y R@Emft P y L N > I ro� I I • py W 13 � 0 O i 1 � 11I1 g � • n:�wo ---G._ -- -- -__ ' - - - - t- __.^ ---- ------ -- -- - - �ipw. -------------- ------------------------- € :a"sF55FalAFFF55555555a ag l5F"s 5l5FAE A5F5@FFF€EF€€FF€€€FE€5€€€5€5€EF55§i"s"E Egg 5gFlJill Ill 1a6555F5EJill F55€ EEEEEEEEEElEEEEEEEEEEF"sEEEEEE.EEEEE E EE EEE EEEE EEEE EEE E EEE E EEEE E E EEEE EE EE EEE EEEEEEEEEEEE s E€EEEEEt EL E E EE E' €(„ttltititle€IItIIIIIEE`i"lleYFiFIflfYifiY6YYii€;���(ddllllllllllEl"lilit(titiiiiiil(J(_ tit t � t tlllftlt EEiiiiiiiEEeEltatt tit§ i ii [ ii SSSS tt� S f tft[Id[td[df[[it[itii(dii[[(([[i[ifff[[f[f[[[[[f ttft[f tii[it tf iifti[idtdttdatiid[i[i[dtdt [ti [f ttitdit 1 i I ff i if f [ j If SdFd[ E i €€ € € FBiI[[IAFfFI[f2F[F[F[II[[iF2F?2EE82y12lFF55d?F?FFA?I?dd(Fttatta(@FFtF2l(222f2f?(292222?i22(F1IR5gygg;,o f C ELCCLC:CitE6:'e LCCL::CCELCCtLLC6:C:6CC6CLC66ELCCCCLLCLC CCCCC R C::ECCCCCC:a ECG6G6EtCL6GL:LLGG 6LCELELL i ....:_III t::tGC6LCtact cz-tt tat: aaa:GLKLt tart L6C:C:CCLEL000 It cc: It LL G CC GLGttLCC tt'e::t000t LCGi:t'et E at it Jill IIll 5Ai AEFFFFFEF[€'si's A5A5A5f g5's 55a5i"s Ill IilUil€iii€EUillIIli EE EA[EiPg§"iUig it"E iiiiiiiiiii t E E E E" E EE EE EE EEE6E E EEEEc E E EE EEEEEEEE: EEE EEEE EEE E EEEE EE E E EE Et EEEE E EEE IEEE: E it E E EE E EE E it EEE E EE EE EEEE E EEE € ttllfliiEiiii��is{ssitl�i��Iltltttttf€i�tt«�tiiti��i��tiit�lii�s�,�Ill�tt�lt�zl�tlllll�l�llhtl�iiif� f[iiidi[[[[Ettiffiftdf[[d[[fi[d[tfttitiffd[[f[[f[[izdddidii[[d[[t[did[[f[ifi[fi[[[t[iiddiddf[[id[t[[3t g ` 1 @ttFttlit[I(Ii[F5[AAdfiIA9((F5F5FFid([(Iildldi[(i3FIf[Fit[(5[5F1(i2HAlFF?F8t2FFdt8S?88FF(iFF828yFF8l?S s e CCa ECtLCCC:LL LL6::LC:kLCCttSCL: CC6L:Ca WCt:C:C:k ti CtLCE:KLYiCYt:LECC: ^:L6L:L:E::CC:C:cEL:::::CCtC E 3 ..GGELLCLSCCLLGCKt:GCCC6CCCCCCtKCC L'e:CC6C:ELL6YtCGtE GCEELt CkC:CSL:CCCC:eC:C:CC::E::LLYLLYL:C::E:ELkCCt EE................................................................................... ..................... .... ; E E5AAi5555555F5EF[`:€E€EEE@EEf 5F4F5€a€a€agE€'sFFA5F 5 F 5 F ill 55Fll all A E 111FF5 I l5g Sag gill"Eg iiiiiiSAAAi5igigigiai€i5F I �E EEEEEEEEEEEFEEEEEFEEEEEEEE EEEE'GE EE°9EEE'EEEEEEEEEEEEEEEE EEEE EEEEEEEEEEEEEEEEEEEEEE'E3EEE F. E E E E E E E E E E E E E E E E E. E' tit[tttlllllllllllll {(tll ltttttIl(iiiitlltt iii{IIIltllllllllllllllllllllllll(€itt litIIIIIIIupgs jEti itll,' it if[[tiff[[(diiidd[Zid[[i[d[ffffdddf[ildi[(i((t((d(ddiddEiiiiddi iiii[d[iEi[diiiiE(td tiEii[[iiii[(ii[[(iiiiiii 1ta53aA2383I€IFF3FE?FlFftttll€AtFSt?FFFFIFSF5II5€[I€FFSAi!225AAaa;S [8ltd1A9a5333S(Iid3t tt2al€'slaiFad(€aa€aalttla E 6 tccta.::C LC::::::LL L L:CCL:C Ct-CC:LC:tE:: :t:LYGGGLI:. t:6C::CC::::CC:Y:ttECLC:L CtCLCi CCY:k:C:LtCa L.^.S C:Ct CLCL E E ::L000C LG CLCtttEG[CGL6:CCC-cc CL[LC[CCCCCCCC:EL:LLCCLC6:CCCCtCC a tLCCC CCCL:LtCtCCCEGEG LLCCCCGLCCCCGCL:G LGLCGCYC YOSEMITE HOLDINGS LLC LAKE WCY ROAD, CHANHASSEN, MN UEEW.HIIO0.v Sta ntec IONAIO-aaTMbfi r -- -- VAP NCE REQUIRED LOTS LFL. LOTS) IPaOSEY IDXIN4 RP T1® IN iRIX1TNi INMDXTKd m.IOI WOIN PMCEIDT WIOM Ma IOT MEA lIXltit roi flIDT6FDIM LIS'0.5F IN.. EM11LY IDI X®E MLIEFLSG'KlF qPl M' OlF' FIK YqE' I1, N... ZoaxG I PON RSQ. gd}XGED .T FYA I%!U®AT flY °RFA NOW RIRIA® IUDFU QgYD® }WJ [� M.-MUnluis12E• IsIDTs w Ys Iw III` lsW w Ns sf A,]a14 6 .. S.R •JXFE s PEwPIJMI.T I.TN. LgyIIPI 4 -- IOIE YI' 4N Iw IOI.N' 1sA1104 'IS.IME4 IS.SSESF IJ f� SIUE SEIBPIX • 10 EEEi 1 MINIMUM LOTWIOIx•w EEA ffiA T I ARLQ BERtl .OY IOC IOIAT Ispl44 '16,WS4 14964 {J MINIMUM LUI WIUIN MP X!IX M - N �9 MAL Lars.Im RET MEAsuRFOA r --- - -"-- _ 47p moxrwnoaasEmPCXuxE. I� ... .......... �� wrrrre�eLQa.rRQelae txusxRae.uTELmeEeeaEEWn ®�R� IfR MwIXUM Lm MRN-1]S RLf I IMXCX®1 A MNIMUM 0.16M.E W1 ...a ! / 9 mDlPmra REWrI1NIDR1PB1 1 g 1 MRE Y I 11e,MMM R ! / - M LEIBIE! >dl'ITA'E nR.n vunNxcE PEOUEsrEO Lars:mq IMINIM.e to � I Ili I lm l WQ eI`Elr a E a 19,90/M I WELoT 1 , I 101R NO M'10D aa.IEr.TIx:Mar:Mx..IAP. eeF A Q ' nPW.PxRnw.nwa,Ll.rIx WPRIx j �j5py p a4TM I '� I Ims rro eslm wmLIe:.M°a"lea } v \ ' ,,'\�-�� WETlN10 I I I ImS ID uEm' Iu(sal:WlWW wv.XIA. 'I BE 9 sT6TL1]R Yw. l .., ___ � ' Ime ID Tvm 3e2e m TRMLamnrE .,, '"° �`"• I i I i Imo w TI`YJI` _.._.____-_. �..r:. yE�yFl4 � �J : mrnEIETWn - ,6 I I IQra vro evxA' M.- ROD MasLwN..M. `I ' -'J� � �,' e 1..._ / .. ...__--• ' I e ..,ram. � 1 i i I I � [ YWEIIMID.REA p X r (PETEwIor{II E4a11M a is IE sip a.sl.�n.elsew J i \ i c 12 - i t41MM' e \ \ �� - tl,IDl4 N m sUnnnlxrrnlaxX V A J . a1R,a c Q OT 21 I _ _ I lU I� g I MIN.a � Efl'IYLIY/ I IL EOI11D1lIle0AME S ,� —: r i saxnrt aETeEEEIve � 0 DeveLOme.rrtREAwwrrE��I » s E v �auaaRre`l �'•.� _ _ _' .^I'�dl. eW m�M el '��nlmwwD y y 3wOa 4 W &u VWR61e1 !W a S OROA fER1Y 390,5635E j •I•• Q M.ilx er /Il I 3 I lr l'\� "� ... - EmNRAR.AIIIIA W Elm7QG R.O.W. 34687 SF I ® i IUAM-- / 1 ' i j __-._.xj i-' armor. mELa aT A� w ! M".rN'.". I n°1YMeriw i 2 .�MR.O.W. A1r6295F rfr-4-. �r--->-. I li i/ 14M1M 11 ;,: rmvnmwxE Liv EDwt�Aa um� rrErunos 33,9E5 SF AJ �, /,• ;'ri. '..:� ',•>�-.-ri i l 'LEm aF : I Jj /! •'9'l7si'�:'. , � � ( ": I ' -------------------- _� Xse.wW. ua ,"�� -} �, . 7 i i': ' •�, - I% c . ,I I I I S oOEmaTracu jXj_ wEn,wDeuWm 17,4035E / x7�/Y�./ Y,�,I��=•'Y, ^-l" 1,� /� . : i, wwxwTlwo E� a� �LR11 ——i,(i~� F !.7 I ^ / /I LM YS,V G�RRIC9 rLMrlOR IIIWTYEA431EXR url8s omawaE gpyiA XET IOfsE 359rM55F ` / rV / -sL. .. {.L /J'�i 4 �:J•.� L"` TTrI U—Q[TA[L SISMN ON ME RNI. .-RMA @i . alnA .,., -A i L.L,L I�� XEr I`eavrr u9,e9s 4/ - -+__________________________^_°_____-_-__-____--- ._-_.-.. _ 1R. CWIOWIrE'£ 15AM aF/WT - - - - - r '? - - - -� � a t� .17.33 LOTS - - - - - - - - - ,M., ^a If maPo4D 13 - 0 4 W 61.01 Y 'lffllvillFfflll1lJ' err• �. � ' �fr t E I 1 O � =—f�' ��� ';• ; yr: `_BEY•- %} }� ,C�R..y 3� IV i'`i' /�{j/fff,. '� ■ fi'rffff/% fj roll fl ¢fi,. .iu rtulrtnlR �'w�E Surp ;,,, YCOnE hWl WAMTX rMF1PCCNi[XRNOIs PEsoaxvws ro o�nnr wpn.0 u W IRxR SAM wmnx. x rssXawnwme n.X¢.R. me Mxlxun u W lunens wP mE ulno..rto v le �ortnoxs. acansnuxriox wnrnes� ra EErcax.xrnw swat wmoP.re Pwr �mpX.l Xnn n.. ec xpwuo.ss rt olroipXs o� .xo vwt Rmnrc wonioxu nEEr ruu P�pPln w wa IX TO«raw.s .wKm.m nsaXDSWoswwP. wn CfVl.ngl FRGM ME.RAU'Fp R.V651ULLRlGIIR NAIr1EX µWp4 XLI TE QVNER. EROSION CONTROL LEGEND —+—x.oexesu®mrlea — w—xuw wm mrro� — m — wRX wn mr rwa —. ppRTt nornmsuram.x amp ® .IE, wprxnax � pnWOM Plpgp m.aaw.m PXVWf /P6f M1p16TO1 MSIX�w/RRR pIdWX (� �kXn'PM.SEpIMLM 1W oMR W ulo Rrt wNx "�� w.aMureosuX.a RwX ® (G 1-T 0 ,EXMP.,r „ SffpwAER XMRRXXOI m 0 `m.w7m (j melvm � ,• NN y G 19 MITI MI IOiI � � WETLAND I I e t Y1 tL _ $�" J '•Y awtat4s ' 3t li( ,rqe �" `�M1 u I --'�� .�m•...,i.�e.w O � j NC Iblj3 tI m. �ta0.tt t �tae II'1C.� "'•.. '�r.r,� ; I "M �'.o��� j /':A� p �>' �t00R0 I r Vq `�_ �I I j �'e•xmmeno®�^row..mo V eY ♦ 4 A0f 10P0.16 _� III am. wi w �..0 i151010S I IN ................ ____ I , �G3.01 t — — L II II 9 II II I I I 1. "1Ey M1T)El6m HIX MIR. µpmpKIEO MR"1£ 06ixYpW VMN®MInFS ]. 011RKIQ 9 W 1 NOnFI M ML11Y.YlaYp1� w 1 �1' N"]IRSEIUELWX[[IIXLmNlI Fi61YGt1! ]. wIM.MixBIJIWrx SIWLE }RR. C I l Mi M11116sW➢SE@I181(la)MV(IIExXMIB)NIwi61 1 IXKSING IB'•hXI1GLLpEWIYi 1WIR`E ENS 6MEm /E� Ey i � p ,� NfISICE EIX£�`NfIN�w r 1 I X rMIXIGl01 x/.gxIWXNra0I91MML w.xnwma. .•••- __ la— r 0. NixE AB:r6xYanUL CNMIRBETwEExwxlEX11XF5, _ '-' -�--' � GXrtMYIIXE; SINW LIX6AVO G51II161F#SnXG INO 1 flap 111E yMlx0.vnNE LNLL N VKrI1E IKN FlPE WIM % 1 XFF �Iq1�LxiIGSI10L�R�pix9N5NQOaL1.4. 1 wrtxNUMNWXR TMwl`=; RO/I.1111 1 NaooI�6 X[pll --N , PIPE"Ex• • 10 I I I , --I 1 I • M•a�x�s .roE aY� OUTLOT1 l9, I a� `' 1 1 �I MYgW1I1YIM _ Bxb'tffuor GNIE VN.YE 1 ..� I I I I I I I I Y16T/JID i I IWIEV9 I I I mwARE FY EE45BV:159WL^MxxwlxlNID WY wuwXmmro RwwXx*boP.Sl. w. EXNvuE msnl<vnEma. fl. msnwvrurt �slwi EXEVEuown¢a wnro ge e� 9I w \ rort. wlu xmE ON (AY)-101036 ;.,; _ •�XmE.ro,�w,„X.tolwilre. dV(x7-Iola.% . ION wre •�•��.i„ ro buawrt � li I I sEXnN umwa XmII 5 swwXrorE I.Ew Mace ® I I xE�t I I I I � I I I I j I I I I fx. PEre"rollrtwwwnmxawuw"rsmxm wNM. vmmEs. u. mmuRvxIDxmoxO•EfcemXwnxcm ixE mNRFlG MSN Sm KNmIW B D NMNx NpE) xVwvN.mlurtxw.s uu lxnxlGnm cf lxEw.ialuln e a �r3a ii •� 1 1 I � "mnxK g I N. mtsswllGur Gvrlpv[orlur tllE LCGnM iSi ' T�' i ,,.%'I� i 1 / / 1 I I J / I 1 1 ulwv El/vxnox NEOs.ws MlmEz/a sxwxwax mfsE XY156G4rgI PE2SMRMf Vy1WSMIPYmA1WNB. n�XxE rosvxu.XmwxExExrs uxExwnwu. mE wwwnax rsxorro EEumwxs Nlxc N<iw ..- .-._ � % i%"'" I I I mvPuif. 1NEQM0.YlM swusnmranno munoxa �•j � I � Mf ru•rz E.O Mwxrz Mulla wurooumurna. ME _ •� ; I I I i I i msI•<iusuuownN+mEXNnXrz %e eMi.t tMl) •Nom nsxru EiEXEsor�Mlm NiEmmwnaXro ®e�iXw�DlmrsnOvm w"v�E u�• wlnlrE Spwm ff�, ,4j 1 I u /u Eemxnlr®Ernna.wqoxmEnElunaxsuWlx®n IY 0O.Mi SS I I, oppe MpoXMury sEmnEEmXvullEssrwlEEXroXnm I i I l0�"rSarollPl"'"xN x�FXV1�6a11G I.�I[N wtl 1HE fVW U 12 e l m .R,X MImN�xnw M m. Nw x n Um I 1I �NI.XE . ro1EaOcv�"X.xsE"liasrm""'umnuxc'Eucrvcv ww. sn j t 1.1.` `' a iLOT 2 e I f — -- - 1•. m" aNE"�: a rGnwa Z 11 .,aM,D xElxamNwNwGM°a �"° s w•+wa ;',- I I XI®nGnNsnOXXw.ExE.axawaol. JO I \/ M•M•n L C) I M] PROPOSED DII LINES Z I 3 I I RIM.f015.311 T E w W _ \I ` �"•.� 1 �INV (M'q-IOW.IB / Owlw• xswEw.l Ewe i 1T14➢CILI _ �\ I Am O �»—»—»— s]onn swEX xn CJ . Ml•llaV12 � � � 1„'� / I I ___ -- � �1�1�1�1� MRR xxlx r I! i jSWNMY59NIQi PR�SED UiILtiY SYMBIXS PocuarO II III \ 1. I I • sunup arwart I 2 r I I W9 m • rwwnE • a.,r 1 I I • SWIIMYNI YINN IER4NTCx y II 14 I 0 S1NIN.M91611MG1p V9M f NEU I I • sm•I SEMER unr Nsw f I Da5]INO W/ItER — � 1------- . sroEl sOwxruEx GO NRIax .Iw ----• .. .1 1.. . 1 ' � :` . DaxX sewawmEr smNlwE - x .. m___ y<.._, -' f �Ip •�. ,'-._J._=• • smnMsewawNnOOmlenws L.rx .��•� OW B9 ____ � iK M'CENI! _ ® r eRE '�_l V � __!__ VI1V!_ i� If�9R//R .� r • W1RxxfNX91 x® i 0 M i 1 / ]WPM)-101 0npxnle aawan 'F6 RM-1011.15 OunoT 1 IARR0IR• - _ _ -___ QWldR a ? - LTI ,-- 1)9'9T I�„_- p.lMr 1 I�1 �, ,-�` 1 iw� s[Rlnvmwhs: 5. ul �Xnrza ss,oul�N«a.nxN o>vcRo uwxS i. miRna,a sxulNonn Mimi°lrvum«nmcN,xswcrras ,. >INBII�RvN.T0s°¢Y3Fr T AYuI 1D.]m[XL I6IY. T.1. 'iM«WE 'rt TO s. 0115�r1NrOF �xu'wuxn wxlxxN «xommaW. ,«x Nnx, «n„xnal row1,« R,W°°x Wn,w1,x.5, :"Ill.w. l,xa ,,«In llx� µo ru 1a�51 �=n«c nro W�AMiwnuvllx°zw1v� 1[Ixm Fln wlm M Wn1tWN° SIW1 MAaVF M[O WIttN UINR WTI MpORLLNR MItlT 114°$ xfQ.nx[o ro NUM« wx,nux M lr acwu.¢. «nwwws«un1 x:ll°ax nm n.0 ° I1w� �.Iwo.lw.la«I,�INRxIT.INVN,..n. R p°p°°mlawrtll�Nww�solmrrsnen Ele nnwY°isaxr«9umro� .. xuo>uert Nr ewwsenenrs srwlxnsennm,nunnar 6M S,PEnRx Nmw Imxi nil. 10. anmuslIL, waxon, TO IosxoWW r°mlw un19 1m. nTO e xsuru F sNnnanvnws acn 1. .1 nu �. uun°rz u. mxlWv:Ianusxol,sl•e Nw mllwnnc 1. me na loR«nl.nuwu5, Wim Nu l.amIUR.uu Nxo Ixsru OF TMs wnM wo .. .HwuroNN1� oxv °sm`;, W`un m't�°�s is "Iom�orv;�°" Nnru E.Nuxa xuaos«,xeNwous ullu,.ml.oxns .��1,w �x1wxl5lw,xINN1,°IIIE NZ .[ .A Mai1116 W'Y�iI[f R160rn nPlOF mmw.cra>w1 mlNnermWlw srxrs oxe w.., lxsn ` 15. .Ox°�N. IIB2'n«6 Wp➢x R.,FTFAT—x IFFF°n xmrowan xu mNwzgssAM1TON A `ImlTMer11.1 1 R. 1eNI..•cra sw.1-1 WI Ix u 1 unlll. mwmla.a [Wu TMa Rlwxlsnnxs.Iall«II«s Raro nulwwrw NnxSlw sm uamw: ulawul ww. 11 1LIIIMLIas in usx»,flm[xw x,. xx,1.:Nno TFFF�'� ., N`!Q•LPY 55Na—WVCA QF;I"xiP°i,I�SN°ul sr°anunansxa snul u wNw.° x. vsx. IM(R)-1R99.47 M(5)-p09..) >—>—>—>— 6u.. -7 W. s[.vl« -M'-12' -'—""-"""'- slansrnfx wumnit —1-1-1—t— VM1kP ✓.Vn �N9 Res-1010.57 eN (N)-]005.11 eN (5)-1005.01 PIIOPOSm !KICKY SYMBOLS L111.M.OWIR —Ixras•Rv •1.091 • NWN«F • 5nxl.nnra5,an1r, 5.nn«. 0 s+o.nsaE. xpn[urol asm mm-10 pM-1019.00 • smuN seWExuml aslx im. INV (W)-tOp.66 >- sm.n srvsn Nruo N.o sErrox V MW"Pa � S,aN5aE90Y11Fi 5iYF1Y4 ` 1 � - - • s,an SfVIE0.0.EPM1QV 411YIL11N1[ . tlWX nlEpflXWf w- N - ---.. ♦ a.9uv nu xra.wr H roH4xiS S ALL DC ttoN umFWOH aR 1EAW5 t59-R)-$90 ALL HMIANTS ..IT DE PNRO'h0 flV CP' M. ;ate urrn.ne.R n ua.1 \ r• ua mro aXINR s w -mtwa uRMM..W w .wwiM�4uxwi� •[ewxr. Or TYPICAL /1 YDRANT INSI AL LA III N ..'.L_ . Dfr'ARTXENi w 1001 5EOICN VIEW1\— mwNa isem. nwf i. eoea� w. �m�Ifp STANDARD MANI ENMWMINE MARMdi I � M 2101 N.,wr omw mdr w �x a mM unmx�.0 TWATER SERVICRMC E EXGINFMIXE W kRMEM NRM' 1005 ..L LeT CAI ,r,w %;•"�'.e^:+.a1?' ....,. .«mom PDc�mYn�nD1I MANHOLE CASTINGSnu bML1dMSCs AND LIDS DETAIL e Y ..Go-, xo x."•e I. 9mlll F 6mn Iwn F. X l• i aM^M,w ro 1 F"n w.w. N'vr N°sii sMi a M li' x.. Rx ie� Cw�Fx. /)�ex0ov fXM µ ashy w a. mIf 1WICAL GATF VALVE ANO BON INGTALLATION CxG."mNL CEPI 7� 7 41 xe..e n.r.e� Ill T n' ..A �R PIPE BEDDING IN GOOD SOILS RCP & DIP 41WR1 oa EXGIME9NG OLY V. rare. 22C2 I nsw x u°rc / r i. `J{may ro. SANITARY SEREX SLRVICE CONNECTION DETAIL nv�ii iTGiTDfl9LRln0[R9ElYR- nY r �Rx Ix a n: ni eAR i°. yM urY. ;xw a �wsrm� Nfa lyp x xn05a xiK in r[µTR{N[I,. iNji•L •v."�.•a M<[ iti !HF ] 1 2"n �[•LxWYI RWi1Ep M m�Ra[ na{��OYrµr'R. x• r x �Ix.MI"�1° W P.xuux °WxOx lru M cWxy n•2F • o• 1YPICAL SANITARY AR SEWER SANITCC dtlMEEAWp "EPMMdI M[Mi •jppl 1 i V"Y PIPE BEDDING FOR P.V.C. PIPE CNGI.1"'xc MVARTNW 22.. 19 is ena iw� n e 0111MNN UQUP STORM SEMFH :acaa ar,'na'w"ra'v�r:e°zt,T�' a�a a aff RM SEWER ®�® CROSSING d INFBII. CEPIRIMEM nea 2204 im CAIDNIBASs W-"i DIM TYPICAL 27' DIAMETER ®d® CATCH BASIN ENdHEEWNG OEP...T ITMv, AT ,_. SRx. MiS.nPPa... Y9 u_4_N'WAPJ4JIZ0- �� I INSULATION 0 DETAIL ENGHE aDEPMTMdT �uM s. 2205 4WdftC„o: ^f�`Y�..Jq �� dk rrxic MAT mmec=.p ewFION A A QRQ CURB CONSTRUCTION �l AT CATCH BASIN dGHEERMO LEPMIYFHT �� 31M J l PLAN. �wA a, All —T w a.IMw. aie. SECTION ,..., ,A., - ° ,...el..—, TT.., ... ,.... mmn.. Off OP STORM SEWER CATCH BASIN awmm 2' x 3' RECTANGULAR ENQNEERIHL OEPMTMENt rw p' 3101 RxN ,I.1GwrWnu .N11 .w°!a rnx :e.� IL T<. mPm .I.P Ae+n e.r SL511,1 A p nlw11.1( 1..IT L . (uo CA'POF RIP RAP DETAIL EMOXEERIr o Mi T 3107 AT All. maN..m nn ..IT. l Make of �..:.. SES.ry^g • IT, TYPICAL 4DIAMETER mQ�Nn�Pp� 1 CATCH BASIN MANHOLE daHEdMc E£P..T .w a' 3102 ISOMF TRIC "I cIffi GLARED END SECTION ENg1ANIN4 DE...T — 3108 C9.02 Pgg �y)at S¢B!• by pll ewaiG. A a. G_I �003 NN , . ..,a.a,r,.r A.NINE CflItlB EM I_ ' , ... » RESIDENTIAL BIIUMINWS DRIVEWAY ENTRANCES WIEN AND WTTHWi CURBS v,uMEu1. DUAREE i rrt r5209 N........ ...b QIIOP TYPICAL CURB AND WTMR AN Frvcwrexwc oceAmum r' S205 i F + �� RnADP,,. NM fL^' INI GILAI Q�IOP CONCRETE �� SCF WALH Mr,.. 1 " T kd �R I TYPICAL CURB RADIVS f11LWEEPINC CEPAAIYEM 5204 nrz �M 1).e.re)rn vn.n NEE .PI„N ME„ .. a.°°r n.a,rz., a IyEYfY JEUycy oE7py ,nn YJ_LRLIBLZ—F Xart'[ , ,uo w,Eay..s s L �RCu 6" $UB-SUFFACC 02AINiILE u +an tNDmffwmD mm�xmtw ° e 52;E E»nD.,e.",.)., D„ J tANDAND WL OE'SAL 'NE,w.a�w°. :w' I law ti.U!Nii. IP�lEVIL MAAA. ,e ..v a uw. Mir TYPICAL CUL-DE-SAC DVP DR- DEPARUVIl 'E""' 5205 NAL an A, 1 -11 `e A, N n1N1 b I A= SUB -SURFACE PVC DRAINIILE 1� CLEANOUi FOR INLINE AND END OF RUN CLEANOUTS ENDINE.I. DEFAREINFNT w'""' 5234 VkTR/'pRw tlAVItIDfBW.HIX IIYI , n. R Nneo Naoirn s IX I INAI NI END SEDIMENT TRAP _n WLIR/WATTLE ROLL / •�„nn w�. r, xu 11 N7�� n r". —u CONROmf O K R11C ENTRANCE EIWINEEPINE OEVI LN, � T I SI 1 PNH^ [ al 5 nnrFRlNII ncnXRTMxT A,y } 11ee11ee m �� .� IA We� OFFROAO CATCHBASIN FILMR BARRIER F..N BRNN A -A` p" 5302 m......:......SK^.: IN .�... ....".. WFR LIGHTING O� POLE ExvxulNc rcrAmILM "N"N" 5]ao "f. Mh NI '"A En eras conmx.n. aX NI. T D,IpQm-IIk1%Vs M�P�,i.k44L;f Y"f CATCH BASIN SEDIMENT TRAP _.. ExoNRFKO W `IRN! N 5302A S u NAMIIMGWM�IR16 AlMMMMY a OMMMMMMMMw 4-1 wu �ce.+tia.uma,m�.s..ww (O uw wgss J gee PC �4p_ i it"'Immi r RAMPI MD M® n�wn�r iw r• _� nMaaMwM Yia VOw V V uc rW e W� iaemn:rimm,w wwaMEvw�6'a�m �V ��. MYVdIM OINn Wf4LL4 Mfgf� IM6.4lCY�MR W. OflWIDN100.NIMED ixff pM111NGp1 XDVF PUHIIIIG tIOIB '. wm MO�laa'IO�MaCBMRW�YOn�eM �� D n�GLMQ<AEEX1Rfff1AXRIG O� OG�M1fRDWNX nun uo®wfvuunox �v.4muuwvq �s4��YrzwMOPiY. .NLLnttix. nm.6®ma Yom�w�mvu. Tnn\ M x.onm neiw IWIINI. numym�xuRl ___ im.m.emu ♦LTN(�nLOM4pfn u� oQ.¢.iffiv& 11 �iYvn.�x�a o�u�m4 ruWu w � gmv6 .nxa'�Y �v dun a n[.¢PYrz A �xMmnmm��n tY.®NO.IiM u m 4J S @ ZONING - SETBACKS VARIANCE REQUIRED LOTS (FLAG LOTS) I� THE PROPOSED ZONING FOR THIS MIN LOT AREA • PROPOSm LOT PROPOSED LOT U 2 PARCEL IS •RSF• SINGLE FAMILY LOT FRONTAGE LOT FRONTAGE MIN. LOT WIDTH LOT WIDTH ; ! RESIDENTIAL ZONING I LOT NUMBER NOT INCI IE° AREA, FLAGPOLE' AREA FLAG `POLE' F L48J REQ. PROPOSED AT FYSB PROPOSED AT F156 � INQUDED NOTINCLUDED IIN311DED &n LOT 30' 30' 100' 110, 15,000 SF 25,795 SF 27,283 SF g MINIMUM LOT SUE = 15,000 SQ. FT, i a IRi FRONT SETBACK = 30 FEET 184 291ID LOT 8 39 59.83' 300' 101.42' 15,000 SF-15,146 SF 15,956 SF I= REAR SETBACK = 30 FEET MIS ( deetl SIDE SETBACK = 10 FEET S87.12WE ) BID FILTRATION LOT 9 30' 37.03' 100' 100.47 15,000 SF-16,034 SF 18,556 SF I®a MINIMUM LOT WIDTH = 90 FEET EASEMENT K4 MINIMUM LOT WIDTH FOR NECK OR _785.10 __ ; 61 FLAG LOTS = 100 FEET MEASURED AT �' — — — - 7 tq _ LOT TYPE t BLDG. PAD SIIE DRAINAGE A IIIILITY EASEMENTS v I 3 _= E FRONT BUILDING SETBACK LINE. --/ ' -_ I , S - I 30 BLDG. SETMCK REAR Y ll MINIMUM LOT DEPTH = 125 FEET — _ — _ ' - FROM RU F9l - - I ® ` i r,e LOT NUMBER TYPE PAD SIZE "T-------; ("-T-- n° im MINIMUM RIGHT OF WAY WIDTH - 60''; ,' - voBUFFERI 4 o ee FEET S' I I $18,556 SF B IIF / 2S wEll a' S: rII7� `E g LOT I w0 80'X75, VARIANCE REQUESTED LOTS: LOT s, •t6AT18F r - f�4 LOT B,&LOT 9 ! I I Ig - LOT WO 70'X80' L ___;L 1 _ `:$YS - -. L G m I k 10I r I I LOT3 WO 7o'XBO' `-- -- -- -- _ 19,054 SF I I G ID FEET IN WIDTH AND ADJOINING _ pERI , 3p ,i G m II Y - I II I LOTS WO 80'X80' AxoEwwiXl�rwGwr uNEAND ,0 FEET IN A If 1 1 WIDTH ON REAR LOT LINES AS SHOWN ON THIS Y `e y \ MAT, UNLESS OTHERWISE DIMENSIONED, I LOT LO 70'A70, EF 6 D 11 ;S<LT7 O 7P1s,LEGEND LO 0XSTREET UGHT LOT �S 6 L , 9� h\ t I ed5 i DRAINAGE UTILITY m � _ ` "I�O I 1 L0T9 lD 7119(70' _ — _ ____ rn�s•, wA ��s y 8' BINMINOUS TRAIL OUT-LOT VT 1 I I I LAT 10 wD 70'XIO' LOT 11 wo 70'%70' t p - -- LOT 12 w0 PEDESTRIAN RAMP BID FILTER I BID FILTER ------------ G I , m mrmnm,¢u I Si — — I—_------ 11 I � � ' I, I 2swETwoNIF1sR I 19,002 SIF G i 17,79E SF 1g ,, II i • f / Ii ;ii` �II$ I30' BDGSETBFAC - - _ MOTOR m% ¢®nsaaroea—caEaAn U Z � VL=U suRMamrAelE IV&GITTEI BACK OF CURB ZG -__- -— F NB7°L2'20'W I Z , R.O.W. LINE EASEMENTFTO WETLAND (MANAGE t) 0 5CONCRETE SIDEWALK 30' € FRONT SETBACK LINE � O ,wATIraR / wh. N ,I 4 I 1 p: 6 DEVELOPMENT DATA ,I I I \ a .o"' \ \ ,4� 116 ---� ENTRY MONUMENT ' W V1 � I I g C ' I i .� _ i R1OPA roeE oereLHwm) ; �J' 0 W AREA IN SQUARE 5 II I�' '.. - I I B61RQ &GUTTER_ I BUILDING PAD >- Q FEET I 27,283 SF g m @,®EGIN SU ABLE VARIES PER GROSS PROPERTY 390,5635E PEDESTRIAN RAMP 5� SrTE :5 J AREA M, I G I 24,712 SF \ EXISTING ILO.W. 38,687 SF r. h I 18,538 SF %^ ---,"u y I a g$ I I ' A \ I W18 CURB & GUTTER b (ROW. of LIIe Uq' R®A 7 n I i GP I ; ---� %�" OPT. ENTRY MONUMENT ev�TNw, g ^ I EASEMENTI I 116 i RDunoN TO N: DErmrmlEDl I RAT LBIE PROPOSED R.O.W.1,629 SF 1 L I 2 // o j I F I I' ; 16.083 SF I: / i i F CONCRETE SIDEWALK 3EA 0' RR sETBAIX uNE I ow a A 0Pw®a 30- UTILITY & Y R D oN WETLANDS 32,948 SF f I /''%' ; , : (X�77 % I 20 678 SF I DRAINAGE EASEMENT 1 RITE #� WETLAND BUFFER i �•� y�'` T i 'i J� � j ,''�' � �; '��' '�- � _- G II ,� j I DENOTES TYPICAL �u ' ', / 1 Y I 2 vnnE DRAINAGE AND 33 17,404 SF f. % i o '.�' ,%-f ,.-.A J'; +,'"%'_".: % ;T i .. sw nrlma: =GP GRINDER GGRAVITY MP LOTS UTILITY EASEMENTS FAsaB+rAD2. borenn amtstAz) — — '-mow; - % UNLESS OTHERWISE NET LOTS& R 259,895 5� 1 Ty AIL SHOWN ON THE PLAN. PONDING ODSt1NG ®IUmlolatxAn -------------- I L TYPICAL LOT DETAIL N� ________ PaoeLr K.av9s -'-^--� --- FJrsraGaRamacTRAa ____ ` Pwm mom.% 250D0 € RtXYitleIWeIYW r----- NB7°1220y/ I A I<C ( v�v C>r, cRANH COL L.11t\L ate,® IIAq NET DENSITY 259,895 SF/ — — — _ — — ------TII---- - _ ( - - - - -- ------------------ ac® Rx s8 ALLOWANCE 15,000 SF/LOT r- + — — — _ _ _ w ® XH = 17.33 LOTS — — — — — — — — _ rroi w. ttmtn2 A PROPOSED 12 — — — — B 40 00 NUMBER C1.01 OF LOTS / t/ > ❑ I y�014 �0 1010 / � �• / //� � / of/�'J i 6 � 2 / 00` i \ � !' I \ \ \ \\ \ ! I 12Wp% o 1022 TOTAL TREE REPLACEMENT SUMMARY MINIMUM TREE MINIMUM TREE REPLACEMENT PER REPLACEMENT PER CITY'S CONSULTANT'S TOTAL REPLACEMENT TREES PER INTERPRETATION INTERPRETATION LANDSCAPE PLAN OF ORDINANCE OF ORDINANCE DECIDUOUS OVERSTORY 84 TOTAL DECIDUOUS 48 TREES AND CONIFEROUS 84 66 OVERSTORY TREES CONIFEROUS OVERSTORY 36 TREES DECIDUOUS 28 22 28 UNDERSTORY TREES DECIDUOUS / N/A (SEE BUFFERYARD N/A (SEE BUFFERYARD 120 CONIFEROUS LARGE REQUIREMENTS) REQUIREMENTS) L SHRUBS 1 11 11 / i 1 / , oo NOTES: ABOVE TOTALS INCLUDE BUFFER YARD PLANT QUANTITIES 'o i i i // / \ I II I i i SEE SHEET C0.02 FOR MINIMUM TREE CALCULATIONS I , (_ i \ i `Ill 1II WETLAND BUFFER MARKERS P. I II I / / y' a------ ------- (10 TOTAL) ` I I ( 0 1 f Ir 1-1024 — I i t o'rnllll-tl I II y 15HL WETLAND (MANAGE 2) 5t 2 ABS Ism ♦10 + \ 1. �\ 2 CH \ 1 RB 1022 \ I / (' IV / /I� 12 A M /) \♦ -• I I �i�'�'' /'' 1 y 7 '''' I Y � �` , � /I ,�_` / � lr / I .• ' ' , ._— ' r OTC r \ _____-___ I '� / - — — r/ � 7 '� I / REQUIRED BUFFER YARD PLANTING BUFFER YARD B - SOUTH PROPERTY LINE ALONG REQUIRED BUFFER YARD ALONG ADDED BUFFER YARD ALONG LAKE LUCY ROAD. 547 LF, MINIMUM LAKE LUCY ROAD -TOTAL YOSEMITE AVENUE -TOTAL USING THE 15' WIDTH / (ALONG LAKE LUCY PLANTS PER LANDSCAPE PLANTS PER LANDSCAPE PLAN 1.0 RATIO ROAD) PLAN DECIDUOUS OVERSTORY 35 TOTAL 12 3 TREES (CANOPY) DECIDUOUS AND 11 CONIFEROUS OVERSTORY TREES CONIFEROUS OVERSTORY 23 3 TREES (CANOPY) DECIDUOUS 22 22 3 UNDERSTORY TREES DECIDUOUS / 35 64 8 CONIFEROUS LARGE SHRUBS �L'J NOTES: MINIMUMS ARE PER THE BUFFER YARD B ALONG LAKE LUCY ROAD. )) (I BUFFER YARD PLANTING BETWEEN MEDIUM AND ROAD = BUFFER YARD B/100 LF: 2 CANOPY TREES 4 1016 �� 1 / - _ 14 - j ; I 11 >a I b� / UNDERSTORY TREES, 6 SHRUBS 1 3) o o I �`f / j / 83%� 1+ I A 20' WIDE BUFFER IS SHOWN ON THE PLANS FOR GREATER FLEXIBILITY OF PLANTING. HOWEVER, \ a `�^' Iv 1 2 H 4\\� 1 1 J1 i I L ) THE RATIO OF 1.0 FOR A 15' WIDE BUFFER WAS USED TO CREATE A GREATER CONCENTRATION OF 7 AL w I 1 1/ o v I a I I / to I ) r PLANTS. PER SEC. 20-1176 6 "Canopy trees are defined as those trees specified as rims or seconds 1 (Q, O• PY P primary secondary \ i I1V 3 S L I deciduous trees or conifers in the citys subdivision ordinance. Conifers to be used as overstory trees shall \ ?_ have a minimum height of eight feet when planted. Arborvitae shall not be used as a overstory tree". ` (: PLANT SCHEDULE I \ f-= -j - r ' ��,= - , \ WETLAND I I'/ ; j \ >a24 --t--. % A6° \ \\ 1 w.1 ( (MANAGE 1) I� Ili \ _ , _" og 1 ,• ti ,, r f _ _ � , ,. � .. � � 1% — I I III \.. DECIDUOUS TREES -OVERSTORY rp \ \ / r vim• - —1 ` '°•,. Q , eo -, -- - ` 1'-70 rr `\ BM 1 IHL 1 WPC" I- 1012 1010 i 1' 5 YTD I y 101 r KEY QTY COMMON/BOTANICAL NAME SIZE ROOT REMARKS ABM 8 AUTUMN BLAZE MAPLE / 2 5„ BB - Acer x freemanii 'Autumn Blaze' AMERICAN LINDEN / AL 10 Tilia americana 'Sentry' 2.5„ BB - CH 10 COMMON HACKBERRY / 2.5" BB - Celtis occidentalis RIVER BIRCH / RB 10 Betula nigra 2.5„ BB - SKYLINE HONEYLOCUST / SHL 4 Gleditsia triacanthos var. 'S cole' 2.5" BB - IMPERIAL HONEYLOCUST / IHL 4 Gleditsia triacanthos var. 'Impcole' 2.5 " BB ' 1008 1 ti r I * r - �i)18 I \ D .� / / / ,�,.•`s•••.i 1006 , -.. �� r r � � � \ CONIFEROUS TREES - OVERSTORY • / /I 1 ••►' /,, / l ._-1004 '10021 �•-•1000 ` \ �� �C, •.,I - 998'' r r 1 1pp4'� J / / l l : i'• 997 , 1000 002 96 w`e li•••••`•• • •\•\�.• ! • 1 / SEES 1 1p\I ; I W �. , BLACK HILLS SPRUCE / 12 Picea glauca densata 8 BB - SP 10 SCOTCH PINE / 8' BB - Pinus sylvestris WP 12 WHITE PINE / 8, BB - Pinus strobus 17 • -- -- _ __ /__ 1 ./ I I \ ) I / ORNAMENTAL TREES - UNDERSTORY _ 1 •. °�� I i ISANH-I 2 INV H=100 z _ — EXISTING BITUMINOUS TRAIL- - _EXISTS- — _ — — — _-_ _ m G-B s G-B A I<'r� I 1/\\/ L)L.\ , -- -- _---- 99e = 996 —1008 \ I I ) I I 1 ._ �� 992--- I0 -16 T4NT/i� PE ` NOTCuA'mAt ��: � CLVr ,\ AMUR MAPLE / AM 6 Acer ginnala 6' BB Clump Form JAPANESE TREE LILAC / JTL 6 Syringa reticula 6' gg Clump Form PRC 5 PROFUSION CRABAPPLE / 1.5" BB - Malus 'Profusion' 6 AUTUMN BRILLIANCE SERVICEBERRY / 6' BB Clump Form Amelanchier x randiflora ;Z- 5 TECHNY ARBORVITAE / 6' BB - Th is occidentalis'Tech n ' SEE PLANTING DETAILS AND NOTES ON SHEET L8.01. IN CASE OF DESCREPANCY BETWEEN PLANS AND PLANT SCHEDULE, PLANS WILL PREVAIL. CONTACT LANDSCAPE ARCHTITECT FOR CLARIFICATION. IMIAIN C. FA BOX Ml - EXCRW MN 55331 Pit 1 1474-22M - Fa 00 474-M AR 2 8 2017 'd4WHAMNPI NORTH SCALE: 1" = 40' 0 40 80 66 Stantec 2335 Highway 36 W St. Paul, MN 55113 www.stantec.com a om W co O Z c 0� C W U T M co LL s r C W zco o' a0 PREPARED FOR: Yosemite Holdings LLC PREPARED BY: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the state of Minnesota. SIGNATURE: PRINTED NAME: DATE: LIC. NUMBER: NO. REVISION/ISSUE DATE 1 Landscape Updates 03/15/17 2 Landscape Updates 03/24/17 DESIGNED: DML SHEET: L 1.01 R DRAWN: DML CHECKED: DML DATE: 3/24/17 BUFFER AREA PLANTING DETAIL / l 70 `f' E�p 1*0 I\ r -r - I - !' \ 1 !/�� I I , ti o I I \- �..1 1 — '— f /V/ /•� 1 I 10. I l f O 1 V i I I I �� ��.� \\ �` _! 1 `1 1`"., I —F — —.._ a 1 y1 1! i� i ��� ' 1 b 1 �J I ' 1008 I I — t� �� �_; _ 1 a 1 s 3 PRC , 3 OHS \ • r — �_ / 1002 ; -' - 998 _ - 7 `\ 008 J 1-VJ�P I / / r \ \ 1 �n DNB i .. (y! - 2 RB ••.' 1000 --- n - \ / Q6 _ EXISTING TREE -i -`i " Q - < < 1 RB 2 ABS` 2 BHS 998 ` !i \ 0�4 \ .f TO REMAIN (lYP) -.. \ / SP "-x--� u" / 1 1 J 1 CH -.2 Sp z� 2 RB % r ? Opt \ Lf / I / / �r lrr , a ' •tom (� '] a �7� / I -, �, .' 000 � � I �.. 1 SP -- L_ \ l ti� r I 1 AM \ 7 CL �� •a r_ENTRY MONUMENT I t r i .. 5,.d �1 -- �. I . 3•AVI" ••...I . ..... ... ,, s, l r i BHS=� i 1 PRC 16 FVV I RB ` ; ` .,,• / 1 1 _- Loos — _. r SSE DETAIL r I • r / T J zo 2 SP � � I � n • i I BUFFERYARD 3 BHS i` 2 BHS /\ ./ 3 WP ! / W 2 ABS l A J ., r g B RTD 1 p o- / SETBACK — - \ �.. --t----- - -- - -- -- ---- �' I_ 1 PRC ! e ' fi •.,•------------------L R$--------- - - r i 7��1 CH 11 B • : �8 tw G-B ' o ,AM �- i /j •f 1 � AM r / ♦y • ea - - — — — — — — — — — — — . OHP OHPCHO = - --- ------ I • I EXISTING BITUMINOUS TRAIL % OHP OHP OHP OHP OHP OHP OHP OHP P — — — — DkIP — — — — — OHR — y e e ----=-------- �..� - - - -----------=_ --QH�- Q --.-----V ------__-----=B-=—��$ _G-B -- -ou G? ------------- _ _ _ W ENTRY MONUMENT PLANTING DETAIL PLANT SCHEDULE - OVERALL SITE KEY QTY COMMON/BOTANICAL NAME SIZE ROOT REMARKS SHRUBS & PERENNIALS COMMON LILAC / CL 19 Syringa vulgaris #5 cont. Purple variety DBN 19 DIABOLO NINEBARK / #10 cont. - Physocarpus opulifolius'Monlo' RED TWIGGED DOGWOOD / RTD 21 Cornus sericea'Baileyi' #5 Cont. - YTD 10 BUD'S YELLOW DOGWOOD / #5 Cont. - Cornus sericea 'Bud's Yellow' FW 40 FLAME WILLOW / #5 cont. - Salix 'Flame' INCREDIBALL HYDRANGEA / IBH 6 Hydrangea arborescens'Abetwo' #5 cont. - MYJ 6 MANEY JUNIPER / #5 Cont. - Juniperus chinensis'Maneyi' SCJ 3 SCANDIA JUNIPER / #5 cont. - Juniperus sabina 'Scandia' GR 14 GOLDSTURM CONEFLOWER / #1 cont. - Rudbeckia 'Goldsturm' MNS 12 MAY NIGHT SALVIA / #1 cont. - Savlia nemorosa'May Night' LDS 6 LIDAKENSE STONECROP / #1 cont. Intermix with Firecracker Sedum 'Lidakense' FCS 6 FIRECRACKER STONECROP / #1 Cont. Intermix with Lidakense Sedum 'Firecracker KFG 6 KARL FOERSTER GRASS / #1 Cont. - Calama rostis x acutiflora'Kad Foerster' SEE PLANTING DETAILS AND NOTES ON SHEET L8.01. IN CASE OF DESCREPANCY BETWEEN PLANS AND PLANT SCHEDULE, PLANS WILL PREVAIL. CONTACT LANDSCAPE ARCHTITECT FOR CLARIFICATION. Lm=8E=CeN INC. LAN IUM - � - CiR=N FJL NX = - EKMWW9= Pt =1474-M — FBI: = 474-M NORTH SCALE: 1 " = 20' 0 20 40 Stantec 2335 Highway 36 W St. Paul, MN 55113 www.stantec.com am W ca = o H Z t` O G I` oLU 'U'^) U VJ O CC F 2 zCU a Q U PREPARED FOR: Yosemite Holdings LLC PREPARED BY: I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the state of Minnesota. SIGNATURE: PRINTED NAME: DATE: LIC. NUMBER: NO. REVISION/ISSUE DATE 1 Landscape Updates 03/15/17 2 Landscape Updates 3/24/17 DESIGNED: DML SHEET: Ll MR DRAWN: DML CHECKED: DML DATE: 3%14/17 71 TOTAL TREE REPLACEMEMT SUMMARY MR04 M TREE MINIMUM TREE REPLACEMENT PER REPLACEMENT PER TOTAL REPLACEMENT TREES PER QTY'S CONSULTANTS LANDSCAPE RAN INTERPRETATION INTERPRETATION OF ORDINANCE OF ORDINANCE DECIDUOUS OVER5TORY 84TOTAL DECIDUOUS 48 TREES N AND CONIFEROUS OVERSTORY TREES OY CONIFEROUS EiSTORY TREES 36 DEmlqus 28 a 21 UNDEASTORY TREE DECIDUOUS;I WA(�gRi3n 120 CONIFEROUS LARGE BWVae�RNts/ SHRUBS NOTES: ABOVE TOTALS INCLUDE BUFFER YARD RANT QUANTITIES SEE SHEET C0.02 FOR MINIMUM TREE CALCULATIONS REQUIRED BUFFER YARD PLANTING BUFFER YARD B - SOUTH REQUIRED BUFFER YARD ALONG BUFFERBUFFER PROPERTY LINE ALONG MINIMUM LAKE LUCY ROOD -TOTAL YARD ALONG L11E LUCY ROAD. 547 LF, (MINT' Law ILLY RANTS PER LANDSCAPE YOSEMITE AVENUE -TOTAL USING THE IS WIDTH / 11041 PLAN PLANTS PER LANDSCAPE PLAN 1.0 RATIO DECUXIOUSOVEL5TORY 35 TOTAL 12 3 TREES (CANOPY) 11 DECmlIOIIS AND CONIFEROUS OVERSTORY TREES CONIERWS OVIiLtiTORY TRIBES (CANOPY) 23 3 DECIDUOUS R 22 3 UNDBMDRY TREE DECIDUOUS/ a 60 B CONIFEROUS LARGE SHRUBS NOTES: MINIMUMS ARE PER THE BUFFER YARD B ALONG LAKE LUCY ROAD. BUFFER YARD RANTING BETWEEN MEDIUM AND ROAD = BUFFER YARD 0/100 LF: 2 CANOPY TREES, d UNDERSTORY TREES, 6 SHRUBS f: A 20' WIDE BUFFER IS SHOWN ON THE PLANS FOR GREATER REOBllITY OF PLANTING. HOWEVE L THE RATIO OF 1.0 FOR A IS WIDE BUFFER WAS USED TO CREATE A GREATER NONCE I TU IY OF PLANTS. PER SEC 20-11M, (i), (6).:'Canopy treas are defined as Nose trads syedbe f as gimary or secontlary deciduous times w congers in the dtys suEs tlion ordinti Conifers M be used as o ersty Y Imes shall have a minimum height of eight fat when panted. Ar6mMae shall Tat be Used as a overstay tree'. PLANT SCHEDULE 1 -- HEY CTY COMMONIHOTANI NAME � ROOT REMARKS DECIDUOUS TREES -OVERSTORY 1/�II�lE^®^fipl ramsee� w i R�OLS-Rs�O{Ri NORTH , SCALE: 0 40 80 ® Stantec msxsn.o, P�� ssaT NY Lim Q a w ID L= 0 r Z � O_ � G C w Q) L C Q U yl.M®NyIF. AUTUMN BLAZE MAPLE / 2 S ii'AUWmn Nil®' AMERICAN - Yosemite B LI AMERICAN LINDEN Flits amens a at'Sent,.- Holdings LLC \ - --- - _ _ _ CH 8 COMMON HACKBERRY I 25' Be - Ceft omk fis-- - RB 10 RIVER BIRCH w BB _ Betula nigm - _- SKYLINE HONEYLOIXIST/ I hereby mR tlfy <t" Pher, utlm. SHL 4 Gktlitsia V® ianttlos tar. 26 Be - mrelartwas Prepveebv meauMe,my IMPERIAL HONEYL _. wpemislonand fha amaerN NHL d 2S - Licensed under VM Ii¢useetun Glagibia triacarmi tar. _ _- - tecf rnew laws of the sole of Min rz. CONIFEROUS TREES-OVERSTORY - _- - BMS 12 BLACK SPRUCE /� ISS 9C a glsura derletm _ SO Sp 10 CTCHPINE/ B,as Pinus sylvastris _ _ _ WP 12 WHRE PINE/ C Plnus strobes - - BB - - ORNAMENTAL TREES-UNDERSTORY AM 6 AMUR MAPLE I a Be Chip Fam - vxrar-sms Acer ginnale w s UTL 6 LILAC B, Clump FrATn SAPANEhaEnuldi Syring. - � -- - - - PRC 5 PROFUSION CRABAPPLE/ 18 BB Malus'Pmtusbn' ta— ASS 6 AUTUMN BRILLWNCE SERVICEIROT'/ B, BEI CYArIP Form Amelanchier a gnanei6at TECH Y ARBORVITAE Z____,t.a�T-- -- _A-_— ITV --ss - — = ___SCHEDULE.Thuja Nocriaentalis TeUmy 6 � _____ Ii AB -- � SEE PLANTING DETAILS AND NOTES ON SHEET L &M. N CASE OF DESCREPANCY BETWEEN PLANS WILL PREVAIL. CONTACT LANDSCAPE ARp1IF1ECT FOR CLARIFICATKML 1 *NOTE: PLANS PROVIDED -BY' 7ANTEC AND USiD WITH PERMISSION FOR LANDSCAlt,UPDATES. .aK xa wain/Oft da e 1 03/WI2 - - - osry� fya sxen. PLANT L1.01 R Z O i 1J Qr0 �gw w Cw ZSwa xz �o Z w C) wZww 0 N 0 Z Q Q ~O � Y OK�m�w w� w K K N W N Q m 3 Q Q K yZjK2 w ❑0N0z m z'< a=H� r:5Zw -d 00M W K W O Q��(L OQ �wo� wml. Z QQO< zed0 030w w0w0 R-os0 M VICINITY MAP r:..iksR�a j I YOSEMITE HOLDINGS LAKE LUCY CHANHASSEN, MN a r_ Ui l - LAKE LUCY RD. }hieiE}A d..j \,qFAfUvfS PARt,, j Vicinity Map obtained from the Carver County, MN Online Property Maps. (92016 LLC INDEX OF DRAWINGS G0.01 COVER SHEET GENERAL G0.02 LEGEND AND ABBREVIATIONS SURVEY V3.01 ALTA/ACSM LAND TITLE SURVEY CIVIL C0.01 REMOVALS PLAN C0.02 TREE REMOVALS PLAN C0.03 TREE INVENTORY C1.01 PRELIMINARY PLAT C2.01 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN C3.01 GRADING PLAN C4.01 SANITARY SEWER AND WATERMAIN PLAN C5.01 STORM SEWER PLAN C9.01 CITY OF CHANHASSEN STANDARD DETAILS C9.02 CITY OF CHANHASSEN STANDARD DETAILS C9.03 CITY OF CHANHASSEN STANDARD DETAILS C9.04 CITY OF CHANHASSEN STANDARD DETAILS LANDSCAPE ARCHITECTURE 1-1.01 PLANTING PLAN L8.01 PLANTING DETAILS PROJECT DIRECTORY CLIENT: YOSEMITE HOLDINGS, LLC TERRY FORBORD, PRINCIPAL 4960 SUSSEX PLACE SHOREWOOD, MN, 55331 PROJECT MANAGER AND CIVIL ENGINEER: STANTEC CONSULTING SERVICES INC. ROGER HUMPHREY PE, RLS 2335 HIGHWAY 36 WEST ST. PAUL, MN 55113 ROGER.HUMPHREY@STANTEC.COM TEL: 651-967-4652, FAX: 651-636-1311 LANDSCAPE ARCHITECT: STANTEC CONSULTING SERVICES INC. MARC PUTMAN 2335 HIGHWAY 36 WEST ST. PAUL, MN 55113 MARC.PUTMAN@STANTEC.COM TEL: 651-967-4554, FAX: 651-636-1311 STANTEC PROJECT NO: 193803412 cl?y 0FC111MHASS., RECEIVED APR U 1 416 CHAW.HASSEI"IPCAM11 )EPT V C 4 > O � h U u U 3 Z a1 .0 0m — 0 IF N � O N N Ozw wO W Nw Z o'>." W W a O�ad ¢VO�w LL Z2 �w Es < LL a zzQ �w� 2 a Q 0 LL W }00 0 it LLoa3 S U a w w< d Q «- w 0 w w`z 7 z 4 Z 2 waZZ re ►i Z w V) ILLJ �l LU U to 0 LL.I LU Q ~ O ~ U LU Q J NO REVISION DATE 1 4/1/2016 CITY SUBMITTAL SURVEY DRAWN RTM, SJS DESIGNED RLH, MRP CHECKED RLH APPROVED RLH PROD. NO. 193803412 SHEET NUMBER G0.01 Z O F U U ri �gw W oa2� W zo,Q g=ZE z3,-0 N�O� w Zr w -po Q Q Y m W N ww<O mWNo zm05 z oQ3a Dozzm Zm< LLoom �c�� Iwo Jody QO o Noow �woW-na z r zz 0-0. U3U� 0 ?,0 oho EXISTING TOPOGRAPHIC SYMBOLS STORM SEWER APRON 'c� PEDESTAL CATV BASKETBALL POST © PEDESTAL COMMUNICATIONS �-^ BARRICADE PERMANENT PIV O POST INDICATOR VALVE BENCH BENCH POLE -COMMUNICATIONS Fl, BOOSTER STATION I� POLE -GUY . LO BUILDING LOWEST OPENING POLE -LIGHT BURIAL CONTROL MONUMENT POLE -POWER 0 BUSH DECIDUOUS POLE -UTILITY ® CATCH BASIN BEEHIVE POLE -UTILITY SERVICE CURB BOX • POST n CATCH BASIN RaE PROPANE TANK O COLUMN 0 PICNIC TABLE coN CONTROL BOX SIGNAL S. I SAMPLING WELL LNG ® CLEAN OUT (SEWER) ROCK ROCK •CLVT CULVERT END ® RR SIGNAL CONTROL BOX �j DRINKING FOUNTAIN RR CROSSING GATE [� ENERGY DISSIPATER _y RR SIGNAL FL. G FLAG POLE •G-REG REGULATION STATION GAS 5 FUEL PUMP SATELLITE DISH E- GUY WIRE sEP SEPTIC TANK GRILL 0 GRILL SEPTJ' VEN! SEPTIC VENT HANDICAP SPACE SEXTIC SEPTIC DRAIN FIELD H❑ HANDHOLE �' SIGN -¢- FIRE HYDRANT SOIL BORING ® HYDRANT PVMNT MARKER (REFLECTOR) 0 G-PIPE STAND PIPE GAS % HYDRANT VALVE 11 SPIGOT WATER O INLET (SMALL DIA.) SPRINaKLER SPRINKLER HEAD ® LIFT STATION CONTROL PANEL Esl SPRINKLER VALVE BOX ® LIFT STATION DRY WELL Ls LIFT STATION WET WELL LIGHT YARD VUVI LOOP DETECTOR IIL MAIL BOX 0 MAIL RELAY BOX ® MANHOLE -AIR RELEASE ® MANHOLE -HEAT © MANHOLE -GAS (g) MANHOLE -POWER MANHOLE -SANITARY SEWER Qs MANHOLE -STORM SEWER © MANHOLE -COMMUNICATIONS Q MANHOLE -UNKNOWN Qw MANHOLE -WATER METER POWER •G-METER METER GAS OH ORDINARY HIGH WATER MARK COIWOL OUTLET CONTROL STRUCTURE PARKING METER P�D PEDESTRIAN PUSH BUTTON PEDESTAL POWER f� STUMP •G-SER SERVICE -GAS POINT ON LINE •SSER SERVICE -SANITARY SEWER POINT ON LINE •ST-SER SERVICE -STORM SEWER POINT ON LINE • WSER SERVICE -WATER POINT ON LINE ® TELEPHONE BOOTH EL=C TQR TRANSMISSION TOWER ELECTRIC frES-Il TEST PIT LOC LIJ T[RAAr TRANSFORMER POWER TREE DEAD TREE -CONIFEROUS TREE -DECIDUOUS TREE -FRUIT 0 TRASH CAN e-9 TRAFFIC SIGNAL GAS VALVE GAS D�Q VALVE *G-VENT VENT GAS D WATER REDUCER WETLAND SA p ING W WELL -MONITORING DL WELL -WATER SURVEY SYMBOLS AIR CONMROL AERIAL CONTROL POINT es BACKSIGHT CONTROL POINT ® GPS CONTROL POINT JLM JUDICIAL LAND MONUMENT ❑M MONUMENT COMPUTED MONUMENT IRON FOUND O MONUMENT IRON SET C RESECTED POINT ■ ROW MONUMENT RM POST S ROW MARKER POST O• SECTION CORNER Ts TRAVERSE CONTROL POINT 99 BENCH MARK LOCATION PROPOSED TOPOGRAPHIC SYMBOLS O BOLLARD • SANITARY CLEANOUT MANHOLE • SANITARY OR STORM LIFT STATION ® STORM SEWER BEEHIVE CATCH BASIN ■ STORM SEWER CATCH BASIN ►- STORM SEWER FLARED END SECTION 0 STORM SEWER OUTLET STRUCTURE ® STORM SEWER OVERFLOW STRUCTURE • CURB BOX FIRE HYDRANT ► WATER REDUCER Z VALVE �� RIP RAP 0 _► DRAINAGE FLOW Q PEDESTRIAN RAMP EXISTING PRIVATE UTILITY LINES - CTV-D CTV-D- - CTV-D-- CTV-C CTV-C-- - CTV-C- CTV-13 CTV-B — - CTV-B-- - CTV-A CTV-A CTV-A- - FO-D FO-D FO-D - - FO-G FO-C FO-C - - FO-B F0-13 FO-B - - FO-A FO-A FO-A - E-D E-D E-D -- E-C E-C E-C - - -- E-El E-B E-B - E-A E-A E-A G-D G-D G-D G-C G-C G-C G-B G-13 G-13 — G-A G-A G-A — C-D C-D C-D — C-C C-C C-C -- C-B C-B C-B C-A C-A C-A - - OHP OHP OHP — OHC OHC OHC- - OHU -- OHU OHU - EXISTING TOPOGRAPHIC LINES X X X X 0 0-- SURVEY LINES RETAINING WALL FENCE -BARBED WIRE FENCE - CHAIN LINK FENCE -DECORATIVE FENCE - STOCKADE FENCE - WOOD FENCE - ELECTRIC GUARD RAIL TREE LINE WETLAND BOUNDARY CENTERLINE EXISTING EASEMENT LINE ---- PROPOSED EASEMENT LINE FLOOD PLAIN BOUNDARY -- -- - - - - - - - - - - - - EXISTING LOT LINE -- PROPOSED LOT LINE — — - EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY — - SETBACK LINE --- --- SECTION LINE QUARTER SECTION LINE SIXTEENTH SECTION LINE EXISTING UTILITY LINES FM-- - FM FM— FORCE MAIN —> > > > SANITARY SEWER > —> - > —> - SANITARY SERVICE >> >> >> >> - STORM SEWER 1 - WATER MAIN ---1--1�—�— WATER SERVICE PROPOSED UTILITY LINES FM FM FM ................. I I I I — > FORCE MAIN SANITARY SEWER SANITARY SERVICE STORM SEWER DRAINTILE STORM SEWER WATER MAIN WATER SERVICE PIPE CASING FUTURE UTILITY LINES CABLE TV QUALITY LEVEL D _ Ftvi.-- Fivi—._._-_ : FORCE MAIN CABLE TV QUALITY LEVEL C SANITARY SEWER CABLE TV QUALITY LEVEL B > P SANITARY SERVICE CABLE TV QUALITY LEVEL A _ - - - - - - - - - - - - - STORM SEWER DRAINTILE FIBER OPTIC QUALITY LEVEL D STORM SEWER FIBER OPTIC QUALITY LEVEL C I I ' WATER MAIN FIBER OPTIC QUALITY LEVEL B WATER SERVICE FIBER OPTIC QUALITY LEVEL A —�- > PIPE CASING POWER QUALITY LEVEL D POWER QUALITY LEVEL C POWER QUALITY LEVEL B CONCRETE CURB AND GUTTER POWER QUALITY LEVEL A GAS QUALITY LEVEL D EXISTING GAS QUALITY LEVEL C PROPOSED GAS QUALITY LEVEL B FUTURE GAS QUALITY LEVEL A =- DEMOLITION COMMUNICATION QUALITY LEVEL D COMMUNICATION QUALITY LEVEL C PROPOSED PRIVATE UTILITY LINES COMMUNICATION QUALITY LEVEL B COMMUNICATION QUALITY LEVEL A — CTV-c CTv-c CTv-c CABLE TV OVERHEAD POWER G-C G-C G-C GAS OVERHEAD COMMUNICATION C-C C-C C-C COMMUNICATION OVERHEAD UTILITIES OHP OHP OHP — OVERHEAD POWER GRADING INFORMATION 95p 952 950 �1 .......................... x 953.53 x STA:5+67.19 980.87 1:4 ABBREVIATIONS EXISTING CONTOUR MINOR EXISTING CONTOUR MAJOR PROPOSED CONTOUR MINOR PROPOSED CONTOUR MAJOR PROPOSED GRADING LIMITS / SLOPE LIMITS PROPOSED SPOT ELEVATION RISE:RUN (SLOPE) AD ALGEBRAIC DIFFERENCE BV BUTTERFLY VALVE BVCE BEGIN VERTICAL CURVE ELEVATION BVCS BEGIN VERTICAL CURVE STATION GL CENTER LINE CL. CLASS CMP CORRUGATED METAL PIPE C.O. CHANGE ORDER DIP DUCTILE IRON PIPE EL/ELEV ELEVATION EVCE END VERTICAL CURVE ELEVATION EVCS END VERTICAL CURVE STATION EX EXISTING FES FLARED END SECTION F/F FACE TO FACE FM FORCE MAIN F.O. FIELD ORDER GV GATE VALVE HP HIGH POINT HWL HIGH WATER LEVEL INV INVERT K CURVE COEFFICIENT LP LOW POINT MH MANHOLE (SANITARY) NTS NOT TO SCALE NWL NORMAL WATER LEVEL PC POINT OF CURVE PCC COMPOUND CURVE PI POINT OF INTERSECTION R PROPERTY LINE PPVC PERFORATED POLYVINYL CHLORIDE PIPE PRC POINT OF REVERSE CURVE PT POINT OF TANGENT PVC POLYVINYL CHLORIDE PIPE PVI POINT OF VERTICAL INTERSECTION R RADIUS RCP REINFORCED CONCRETE PIPE R/W RIGHT-OF-WAY SS STORM SEWER STRUCTURE STA STATION TCE TEMPORARY CONSTRUCTION EASEMENT TNH TOP NUT HYDRANT TYP TYPICAL VC VERTICAL CURVE WM WATER MAIN HATCH PATTERNS HEAVY DUTY BITUMINOUS SAND V m 4J 3 m E - O h U > U U a Z (D rn - _a = o' 3�3 � d 3 M CN 3 oz� wow 0-'NZ > O W, W W a o 4 -i <( OZ W LLoW,z U a c'2f < LL zwW ao2� Ja�w< _ a H O J W w 0 �roo c� 0 3 ag W Q—W W LLI U d = < M W :c Z n 0 Z Z ti W Q Z Z =3 Q� K C � Q V5 o U J Z J Lu V) cn Q O Z = a Z Q Q Lu > J = m o U m Q _ � o Q z LU O �- fl:� z � w Lu UJ J O W Q INOIREVISION DATE 1 1 4/l/2016 CITY SUBMITTAL ____1I ° ° Q L:L - BITUMINOUS CONCRETE GRAVEL ; ---- --� BEDROCK GROUND SURVEY D]R DRAWN RTM DESIGNED CHECKED RLH APPROVED RLH PROJ.NO_ 193803412 SHEEi NUMBER G0.02 X P N E 0 n 02 0 ° P oj- n O ° W E3 N > N v, iu v M 009 ~O 0)P � 3.i^ '6a m a 0 X Z f z Z a U 0 Z 0 C] FJ F- <C _J n W: I CARTWAY-� 591.5 I I A Z 7' m I p0 m I I i FND OPEN IP o+ 'K IZ)I A TTrr, I ry \I.�i �/� LL\ B\ p✓*0/6EV\//\X\I \\�I I\ \/ _/ /o°/\\ � 3/ ti //V/\/ ® /C/ V\/E\�/i/o/ / / y\ /om°/ \ ./I \y0 /\ 1\/ /`\ �/\\ti/e/; // � / -L/ /\/\~ /y//Oo/\ 1\I / iu° B//�I./IB /gO/r�/ 7/.211/ �/q// /'/ �� n // \'/`/ ti'° /'�' / �/ \/1� /O/°(/�/ a// q r//\// ° /\/• / //I / o// /// / o�/ /// ti/I // 'i-/�/ //1/` / / " /// < °Ii // �/�//v� //\R/" / � /ti/ � C=/i /� //",I/v, Ep ,/_/y��A L —,D/ /�/L'� —�J // —/ L/-- Jl—/—a���—i I_8'—5\ i \ 1 /ceJ- I 1 .\�I I1CI3 r•�\/a\�j\/ 2 \\ \� �/I 1 \ —I\�I \� /, \1\ —✓oewn°o✓�/\•° /� I\ / , ^o ° ° / OWNER: SUSAN JORGENSEN ' I I LU I 18 rods (297.00 feet deed) FND ti2N S87012'20"E FND IP BER 91 UNREADABLE - o// I I -I —/i/ � ,�% / � �p /Q-, -\• i �0 o � , �/ ®ti oti-- °/ � ° -Q -O- I 'r�©o��oI -1\ \�- 330.00 30.00 \ \ / (deed) CAPM/ .tQ1q 333.03 (measured) OWNER: \\ Q\^W\of\IiN\ E�Rp I\ I : / SUSAN USAN O J \ •\/Oo R\ �G� E^N;\`S oE/\ \\oN \/•/\/ / I G� 'II X 1I �II�III �I�wII II IYIIII �II\i I I. \ C! :QS88°v'20"Ed //-r rai°r 330.76 ILI( (CJI °\ B-1�LE16009.4 -°` - WETLAND (PROVIDED BYSAMBATEK)-- ELEV=1�0 ELEV=1007g 0 3:: Cy Z�S-7 1 ITS ELEVA029.Y � SB R�L9 PP ELEV=1028.7 iS ELEVJ//021 7 u ° 20 -8 20.3 ELEV-10.20 ° ELEV=1011Bj�w ° / ao /� ooE D °IP IX6oo 25 IL6I NG .ram /O /c 74k (measu80.00 �/lo"ti//JPARCEL AN87°12'2V % 4N, 6 80.rrdeed)75.63(measu o©° oo D�QTG i�� 10 t7Zl � to yI 2 Ij IZ Im �C LL 0 Iw �� _ /r°V / I / a � ° I i / / / J I I - 6 C II w �z ,e INoO00 �^-/ \ C EEE B --A I a — ~ 6.EX14NI - - — 6 4 — 0 — _ — — � o \ \ \ \ \ \ � \ � \ 1 � � ( 1 I z n✓ / o 998%/0 ELEV=1004�2�. In St A\Q I W _ 45.4 7.1 ( / / l �DkfSTING; INS I / /HOUOSE ! °I �\ \ °\ / I ° / I GAS ° °/ \p1o4g. -m- G-° 18"1BE�T ��!TNH -005.23 r° 66�I I= --- I SAN MH=1021.12 �RV=9933.18 INV WINV =1316 P IG=6k5.12\ Ir; EXa1S I BITUMINOUS TRAIL_ - - - - P m-�31I1C� �� � ` / — ,�- H =11019 -' 170.00 (deed)=`'�•18 i U1RT G BITUMI US TRAIL INV N=6.30 80.Oq'(deed) i EXT,STING CURB & _ _ I n l� r 11 I In,� n r, 250.00 I ! , n l'� L le,v 1n n n - I B L_ar\C- I� 1 \Vl1V o r INV N=B.4 1�� \ L-�Iti- fi �inV r" G-B M N87 12 20"W_ INV s=8.45 M �\ ✓$ \ 330.00— ��.�.� — 03'W N8i48 j SOUTH LINE OF THE SOUTHEAST- - _. = _ 996 — - - `.\ I\- ���� \ L -- QUARTER OF THE NORTHEAST - - 996 - - \ \ \ = _ 1 I \ / QUARTER OF SEC. 3, TWP: fi6, RNG. 23 ,\ SOUTHWEST CORNER OF NO�HWES QIL4RT 1(pq 008 �0 �� Olq .� _ - - - 992 - -. - STMH=995.� 1 SEC. 2, TWP. 116, RNG. 23 - - - - \ \ \ tl0 \ \ \ 1016 -rNVly-7-3 �\ �_ (SOUTHEAST CORNER OF THE SOUTHEAST QUARTER \ \ \ \SOU�'FL�INE OF �. .� ` 990 INVS=7.32� / a I OF THE NORTHEAST QUARTER OF SEC. 3, TWP. 116, \ \' \ NORTHWEST QUARTER OF-, _ _ _ / I RNG. 23 SEC. 21WP-1,t61tN&23_ • CLVT _ _ / ( (CARVER COUNTY CAST IRON MONUMENT) _ / 1 ALTA/ACSM LAND TITLE SURVEY VICINITY MAP w TTTN w SITE W O NOT TO SCALE LAKE LUCY ROAD ITEMS CORRESPONDING TO SCHEDULE B Item 12: Subject to Yosemite Road as shown on available maps. SHOWN ON SURVEY. Item 13: Subject to Lake Lucy Lane as shown on available maps. SHOWN ON SURVEY. LEGEND —<<—® GATE VALVE n7 G-B E-B • TARN • CELT o OHP CTV-B BOLLARD PARKING METER PYLON SIGN TRANSFORMER CULVERT LIGHT POLE POWER BOX TELEPHONE BOX POWER POLE LT FILE NO, 531257 PROPERTY LINE RIGHT-OF-WAY LOT LINE EX. CURB & GUTTER EX. SANITARY SEWER EX. STORM SEWER EX. WATER MAIN BURIED GAS MAIN BURIED ELECTRIC AERIAL UTILITIES CABLE TELEVISION --u- ROAD SIGN MTL MAILBOX -3; - LIGHT POLE ❑E POWER BOX © TELEPHONE BOX HAND HOLE 0 BITUMINOUS AREA 0 CONCRETE 0 CABLE TV BOX 0 50 100 Horizontal Scale In Feet • DENOTES IRON MONUMENT FOUND DENOTES 1/2 INCH BY 14INCH O IRON MONUMENT SET WITH PLASTIC PLUG INSCRIBED WITH 43133 LAND DESCRIPTION PARCEL A That part of the Northwest Quarter of Section 2, Township 116, Range 23, Carver County, Minnesota described as follows: Beginning at the Southwest corner of the Northwest Quarter, Section 2, Township 116, Range 23; thence East along the half section line 330 feet (20 rods); thence North 660.00 feet (40 rods); thence West 330 feet (20 rods) to the section line; thence South 660 feet (40 rods) to the place of beginning; EXCEPT so much of the following described tract as in the foregoing description, beginning at a point on the section line between said Section 2 and 3; Township 116, Range 23, said point being 610 feet North of the Quarter section comer between said Section 2 and 3 and marked by an iron gas pipe set in the ground; thence North along the section 591.5 feet to a cartway 16.5 (1 rod) wide; thence East along the South boundary of said cartway 280.5 feet to the center of a street 33 feet (2 rods) wide; thence South 4 degrees 47 minutes East along the center of said street 593.56 feet; thence West 330 feet to the place of beginning, according to the United States Government Survey thereof. PARCEL B That part of the Southeast Quarter of the Northeast Quarter (SES/4NE1/4) of Section 3, Township 116, Range 23, described as follows: Starting at the Southeast Corner of said NE 1/4 of said Section 3, running Westerly along the South line of said SE 1/4 of said NE 1/4 a distance of 80 feet, then Northerly 275 feet, then Easterly 80 feet, thence Southerly along the Easterly line of said SE 1/4 of said NE 1/4 to the point of beginning, Carver County, Minnesota. PARCEL C That part of the Southeast Quarter of the Northeast Quarter of Section 3, Township 116, Range 23, as follows: Beginning at a point on the South line of said Southeast Quarter of the Northeast Quarter, 80 feet West of said Southeast corner; thence continuing along said line 170 feet; thence North 275 feet; thence West 80 feet; thence North 170.5 feet; thence North 8 1/2 degrees, East 13 rods and 3 links; thence East 18 rods, thence South 385 feet; thence West 80 feet; thence South 275 feet to the point of beginning, Carver County, Minnesota. SURVEY NOTES 1. The property described hereon is the same as the property described in the title commitment prepared by Stewart Title Guaranty Company, Issued by its Agent, Land Title, Inc., LT File No. 531257, with an effective date of November 20, 2015, 2015 at 8:00 A.M. 2. The bearing system of this survey is based on Carver County Coordinate System NAD83, 1986 adjustment. 3. The subject property has direct access to Yosemite Road and Lake Lucy Lane. 4. Per Item 2 of Table A standards: The property addresses are as follows: 1600, 1620, and 1603 Lake Lucy Road, Excelsior, MN 55331 as stated in said title commitment. 5. Per Item 3 of Table A standards: Subject property is Zoned C per Community Panel Number 270051 0005 B, with an effective date of July 2, 1979, per FEMA website. 6. Per Item 4 of Table A standards: The gross area of subject property contains ±390,563 square feet (t8.97 acres). 7. Per Items 6(a) of Table A standards: Said property is zoned RR Rural Residential per City of Chanhassen. B. Per Item 9 of Table A standards: There are no parking spaces on subject property. 9. Per Item Ila of Table A standards: The utilities shown hereon were observed at time of survey. Prior to any digging, contact Gopher State One -Call at 1800-252-1166. 10. Per Item 19 of Table A standards: Wetland shown on said survey were provided by Sambatek. SHOWN ON SURVEY. 11. NOTE: A slight gap of less than 0.50 feet is observed between west line of Parcel B & adjacent line of Parcel C due to calls in the description. 12. NOTE: The exception described in Parcel A, is same description used to prepare REGISTERED LAND SURVEY NO. 38. CERTIFICATION To Yosemite Holdings, L-C, Land Title, Inc., Upper Lake Partners LLC: This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2011 Minimum Standard Detail Requirements for ALTA/ACSM Land Title Surveys, jointly established and adopted by ALTA and NSPS, and includes Items 1, 2, 3, 4, 5, 6(a), 7(a), 8, 11(a), 13, and 19 of Table A thereof. The field work was completed on December 14th thnl 17th, 2015. AL.Uua. Daniel J. Roeber, Professional Land Surveyor Minnesota License Number 43133 December 27th, 2015 H p O O ^ N w r m � m m o m o Q w Z i u O .. �w n 0 U Q Q U} 0 LU J > O N 0 `n U ut z LU � J H Y O 0 a z OZ o z Qc')� LU N •6 li-_ U 0 < o w <Lij Q U V) < o w O } Q 1 193803412 1 V3.01 z w FU U Q,0 �sw w o0 z z-�wo 0 2 2 I - wz�w iw a Z a QOar m 0�4@ °o .aww m,<o z JO< ryas w OZ 00zz< z,na- L�Zi Cam w� 0 J00w �<o ozmz as ja zzoo w 03= w�wm ,0z0 15 I �i GENERAL SITE REMOVAL NOTES: 1 I 1. THE CONTRACTOR SHOULD EXPECT TO FIND TELEPHONE LINES, ELECTRIC LINES, 4J I ' GAS MAIN, AND OTHER PUBLIC UTILITIES. TO THE EXTENT RECEIVED BY THE ENGINEER, AND FOR THE CONVENIENCE OF THE CONTRACTOR ONLY, THE / I I SPECIFICATIONS INCLUDE OPERATOR -PROVIDED INFORMATION RECEIVED FROM THE VARIOUS UTILITIES. IF THERE IS A CONFLICT BETWEEN THE D '❑ CwT OPERATOR -PROVIDED INFORMATION AND THE UTILITY INFORMATION 4J INCORPORATED IN THE SPECIFICATIONS BY THE ENGINEER, THE / / / ' I OPERATOR -PROVIDED INFORMATION SHALL CONTROL. NEITHER THE OWNER / / / / / / / ° J , I O NOR THE ENGINEER WARRANTS THIS INFORMATION TO BE ACCURATE OR o -' o / / / g / v _ ; O COMPLETE. AS THE CONTRACTOR, IN COOPERATION WITH THE APPROPRIATE UTILITY COMPANIES, IS RESPONSIBLE TO VERIFY THE LOCATION, SIZE, AND DEPTH 3 z OF ALL UTILITIES PRIOR TO ANY CONSTRUCTION ACTIVITIES. rn 1a 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE CONDITIONS OF THE SITE = a 3. SAWCUT A CLEAN EDGE BETWEEN PAVEMENTS TO REMAIN AND PAVEMENTS TO M BE REMOVED. C" 4. CONTRACTOR SHALL KEEP ALL EQUIPMENT, MATERIALS, VEHICLES, CONSTRUCTION TRAILERS, ETC. WITHIN SITE LIMITS. 5. CONTRACTOR IS RESPONSIBLE FOR SECURING, PROVIDING, MAINTAINING AND REGULATING ALL SAFETY PROTECTION FOR OVERHEAD AND BURIED POWER p w d inz LINES. 6. CONTRACTOR SHALL CLEARLY IDENTIFY TEMPORARY RE-ROUTING OF ALL w w UTILITIES USING STAKES, FLAGS, ETC. o F z F 7. WHEN CONNECTING TO ALL EXISTING UTILITIES, COORDINATE ALL WORK AND a U o o O SEE SHEET C0.02 w�,� z COMPLY WITH THE APPROPRIATE GOVERNING AUTHORITY. 0 0 w z ti / I r i I FOR TREE 8. COORDINATE ALL WORK OUTSIDE THE PROPERTY LINE WITH THE CITY. w O f WETLAND I i r$ r �^ / a t I N�a , a- I I 9. CONTRACTOR WILL REMOVE ANY EXTRA SOIL FROM SITE. o °��� (MANAGE 2) r r ° p zw 0 / r P ( I REMOVAL P LAN 10. INSULATE ALL PIPING WITH LESS THAN 6 FEET OF COVER. AS SHOWN IN CIVIL a Z Z W \ G WIRN \ i 1024 -` \ \ \ \ �\ `�, i - \\ /\�\�\�( Y'\ \ II j I 11. ATT EAST 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY IN THE AREA OF THIS } _ _ �E 102�� \ \\ `\ `\ �, �\ i �\ \ a� ` `'\�`O\��l I I PROJECT, THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION AND DEPTH = LL w \ - I I OF ANY UTILITIES WITH THE APPROPRIATE COMPANY. LOCATIONS AND INFORMATION CAN BE OBTAINED BY CALLING GOPHER STATE ONE CALL AT < g \ I \ \\ \\ \\ \\ log \\ I \\, \\ —_ �' ✓\' /i I I 651-454-0002. um i�= 12. THE RELOCATION AND/OR PROTECTION OF ALL EXISTING UTILITIES MUST BE w m z O\ COORDINATED BY THE CONTRACTOR. NO ADDITIONAL COMPENSATION WILL w ¢ ° ° � z Q �/ o \ �!' ��' BE ALLOWED FOR EXTRA TIME AND EFFORT OR PROVISIONS NECESSARY TO 3 ¢ a o - I % I WORK AROUND OR UNDER ANY UTILITIES. REMOVE WIRL ` 1 I I I ✓ J o `� \ - /% \\ }'�� ''� I I I 13. ALL EROSION CONTROL DEVICES AND SITE UTILIZATION FENCES MUST BE FENCE \ / ( I I �/ \ \ \ `� \\ I `�` \ \ ° ©/ p.'� \ ''�O ��J I INSTALLED PRIOR TO THE START OF CONSTRUCTION. /F(EMOVE WIRE \ \\ \ f'v 1 ° _ ��?i� \ i I 14. CONTRACTOR IS RESPONSIBLE FOR PROTECTING AND MAINTAINING FENCE \ 1 \`� \ \ Q Q I I I I EXCAVATIONS. REMOVAL AND REPLACEMENT OF CONCRETE WALKS, CURBS, BASE MATERIAL AND BITUMINOUS, ETC. SHALL BE CONSIDERED INCIDENTAL. 15. REMOVE AND REPLACE ALL EXISTING STORM WATER PIPING ENCOUNTERED \� // / / / / ( \ 1 ✓____ -' / 9�)p ,` r 05 DURING EXCAVATION. -REMOVE CHAIN �{\\ \-'-e--''� \ \ r I j+I I I 16. CARE MUST BE TAKEN DURING CONSTRUCTION AND EXCAVATION TO PROTECT REMOVE LIGH f POLELINK FENCE h o\ \ - - - - -y �° �?v \ \ \ r j 1 1 ANY SURVEY MONUMENTS AND/OR PROPERTY IRONS. p 17. REMOVE BURIED RUBBLE, CONSTRUCTION DEBRIS AND MISC. FILL MATERIAL o � � z \ � o / \ � ' / / / I I \, I �I ' I ENCOUNTERED DURING EXCAVATION. \ / / / / _ - _ \ I I \ \ \ / - - - \ �\ O l / / 1 I I - i 18. UNLESS NOTED OTHERWISE, ALL TREES, STRUCTURES, AND FENCES SHOULD BE / REMPVE RUPaNING WALL \ \ x P r Q � o �� I r / / / I I -D . PROTECTED. VERIFY w NEIGBORING \ / u wl b o o - o \ \ \ �I I r / / j I �I� 19. CONCRETE INFRASTRUCTURE WITHIN THE PUBLIC RIGHT OF WAY, OR ANY C PROPERTY OWNER ON - / / j / J / \ \'i z W' �° / / Gam_ c I 1 0 �; , ' I LI - . ZC / CONCRETE DAMAGED DURING CONSTRUCTION, MUST BE REMOVED ANDREMOVAL OF WIRE > FENCE REMOVE POSTS & ANY- REPLACED. ° GRADING LISIrUJ w wFOOTINGS L 1; J ( II I I I I I I :I�-;I- I�ROMOVE BUILDING & / I I \ _ = J<� GO iONFO�NDA° 1 REMOVE/HOUSE& Q OU POUNgATION � BUILDING °I z Z zbiLEGEND p Q �I :WETIAND (MANAGE 1) ()° oREMOVE HOUSE & q I. I ` I�EMO� GRAVEL FOUNDATION 1 PROPERTY LINE O REMOVE CHAIN LINK DRIVEWAY RIGHT-OF-WAY = O LOT LINE LQ wFENCE /\- O EX. CURB &GUTTERti EX. SANITARY SEWERREMOVE C to \ �NK FENC EX. STORM SEWER k IOEX. WATER MAIN OLu / REMOVE RE�AIN}NJG 61P r/ 7-/7/�REMOVE HOI�g & L\_ 1G B BURIED GAS MAINFOUDATION QuAEING J E-B BURIED ELECTRICOCIUS` OHP AERIAL UTILITIES RE -- REMOVE B CABLE TELEVISION UNDATION f affA� I BOLLARD ROAD SIGN p rPARKING METER ¢ ° MAILBOX REMOVE_GR�VELRsMOVE HOUSE & I °'I PYLON SIGN LIGHT POLEd/ /FOUND ION ' DRIVEWAY EMOVE GRAVEL /v TRANSFORMER POWER BOXP w/> TELEPHONE BOX H• cELT CULVERT LIGHT POLE HAND HOLE NO REVISION DATEPOWER BOX � 1 4/1/2016z BITUMINOUS .r/ EXI NG SE /0/,Lrl008 /HOU�/Jog7/ TELEPHONE BOXCONCRETE REMOVE i EMO�HH_SE DECK � I CITY SUBMITTAL POSC" CABLE TV BOX-AINING TS & FOUNDTIONS° 17( 1 °oQEm POWER POLE ob WALLS _ . \iS' CULVEklr I RETAININP WAF SAN MH=1021.12 I%XV=993.49 INV E-1007.94-MAIN RP H TO -- - Ivr O INV W=1007.96 MINOUSPmEXISTING -_=OHTV CB-999.8 1 FY S�ING BIMINOUS INV N-6.30TRAIL E TING CURB&GUTTER B SURVEY_ \I I A It'r G-B G-B ILI 1NVN=+I DRAWN RTML \VrL_/'_ _ INV DESIGNED RIH,MRPe'Ii TU 9%_-�.___«-- CHECKED RLH0 40 80 ` \ APPROVED RLH - -\ \ I _ �`10pq 1� \ 1p14 \ — �. yI PROD. NO. 193803412 _ - - - 992 - - - - STMH=995.3c- S� J \ \ I - - - \ \ \ l° \ 1p16 , _ / - -_ ZNaTa=i.3- / \ \ \ \ \ \ _ _ / j— — .. — .. — .. __ .. — SHEET NUMBER - —. _ — — — 990 -3Y / C0.01 / I _ • CLVT z O x U a C) 3w w z Pw jwOQ 00zm c a 00u z w ,z„ z r= ,a„ -00N a0�r 0 Smp 0 J0Qo � N F zmo� o�?a ,w„Q3Q mZOz z< a r:Ezw w°.o ?Ooy <o <M MO �0= 0 w r a a-z -z z zz' z w oao? M a M o i0z i 90e / / / t _ 0 0 i 7 I I I I I I I , I t / I GRADING LIMITS I r I I , ( I , 1' WETLAND O r V / I \�\ ----- ---- ' - Vol 1271 - g1i / � �J O 3`! ; Lij t2- I I Lij 1245 1246 q ' / / / / LU I r,� I / � LIJ I I \ / ' EX BUILgING EX HOUSE- � I }/ T— ! / \ LC r4� WETLAND'I I,I U) I 01 1414 (MANAGE �, 1� 1416 I 1 (J 1711 -�2 -� c) 1 1i423 / — � 16 \ _EXING r 42 STI > T IOUSf E�E// I / 150 , 91 I EXIFIFIN �}is I / 1499 1455 cl v� _ �� '4' �— � I I / A EXISTING HOUSE��11♦-�i�� ? _ 4fi7 , , 64 zI — -- . _ / / \ / / A. ( SAN MH=1021.12 INVE=! / 007.94 INV W 1 1007.96 --------�-- OHP EXISTING BYTUMINO_ US TRAIL �- ___ — _ _ _ _ _ _ _ _ EXISTING BITUMIN>77US TRAIL INV N=6.30 EXISTING CURB & GUTTER — — \ I A 1t [- I I Iiy\/ I_ A U _ L_/1r \L_ L L_VU I 1 \L/r-\LJ T T _ /--� I \ L=L _ S..-3'�i I I \ k-/ �J /'l LJ INV N=8.4 ' � _ — I--1 — ---__— _ -- I L / ----- 992 STMH=995.3��5� �'� \ \ \�\\\\To \\\ \\�10 16i/ / iNV-N=7 3- \ \ — 990---DIV.S=7.3Y / " '� CLVT \ . \ _ — _ C I _ • CLVT — LIMITS TREE CANOPY COVER 8. REQUIRED MINIMUM TREE REPLACEMENT TOTAL NET SITE 351,876 SF WETLANDS 32,448 S NET SITE EXCLUDING WETLANDS 318, 8 i A�tG� I TOTAL CANOPY AREA (Entire Site) 208,807 SF j4T4,4 Z CANOPY TO REMAIN 45,692 SF CANOPY TO BE REMOVED 163,115 SF tor' , o/ PERCENTAGE OF TOTAL CANOPY PER NET SITE: I 208,807 SF / 318,928 SF = 65.47% PER THE ORDINANCE MATRIX CHART: BASE LINE CANOPY COVERAGE PER ACRE: 65.47 %, of total canopy per net site is within the 60-79% Comprehensive Designation. The percentage of total replacement canopy is therefore 357. of the removed canopy area for M ilium Density Residential. In addition, per the Zoning Ordinance (Chapter 18 - Subdivision, Sec. 18-61, (d), (2), (d), the total replacement area is 1.2 times the removed canopy coverage area. Therefore, the TOTAL REPLACEMENT TREE CANOPY IS: Z I Z 1$ r 163,115 SF x 1.2 x 35% = 68,508 SF �pI@I�jijlL�.L=� NUMBER OF TREES TO BE REPLACED: Per the ordinance, 1 tree shall be replaced per 1089 SF of total replacement canopy. 68,508 SF / 1089 SF = TREES TO BE REPLACED. OF THE REQUIRED NUMBER OF TREES TO BE REPLACED, A MINIMUM OF 75% OF TREES MUST BE OVERSTORY. THEREFORE THE REQUIRED TREE REPLACEMENT TOTAL IS: MINIMUM 47 OVERSTORY TREES MINIMUM 16 UNDERSTORY TREES SEE SHEET L1.01 PLANTING PLAN FOR TREE REPLACEMENT PLAN C�) TREE CANOPY TO BE REMOVED TREE CANOPY TO REMAIN TREE CANOPY NOT INCLUDED IN CALCULATION (PER ORDINANCE SECTION 18-61 (d)(2), TREES UNDER 10" IN DIAMETER ARE NOT REQUIRED TO BE SURVEYED) 5061 o TREE TO REMAIN PLAN ELEVATION TREE PROTECTION DETAIL - TYP 5105 ',-�— TREE ID NO. TREE TO BE REMOVED N 0 40 80 4' ORANGE SNOWFENCE WITH POSTS 4 O.C. AT DRIPLINE OF OUTER MOST BRANCHES OR AS SHOWN ON TREE PROTECTION FOR GROUPS OF EXISTING TREES TO BE PRESERVED. V M 3 m E p O M � U T U 3 z m L 0 p7 _ O ,O o co a M (V N Oz woU � N K 0wx z-� O na¢ F wF d0� O Uooz w rZ., Zw�O d w Q Q 0 w � w � = � a C w U =r00 K < ag U a w < w m _ ~ wW�w z Q .. w H 0 0 azz z z , 0 Q =�a5 d In o U /J V Q J O LLJ — LU 0 LU N N = Z z g J U o 6 z Q LU O LU LLJ J LJJ Q NO REVISION DATE 1 4/l/2016 CITY SUBMITTAL 11MM0 DRAWN RTM, SJS DESIGNED MRP CHECKED MRP APPROVED MRP PROJ, NO. 193803412 SHEET NUMBER C0.02 z O F x U w C arm Ugw w QO�z w z C)0 .I<w ti ¢ 0 °U,o� wzLw o aQ -RO m 00w,- '<0 O z J O OB z� J3¢ rcy�F w oz �oz< zm< 52 520zi .°Qo Iwo oa Ort2r z <<O¢ Z6�O w 30o W K W ror0 Removed? Tag_Number DBH SPECIES CONDITION Comment CAD_Code Max_PDOP Max_HDOP Removed? Tag_Number DBH SPECIES CONDITION Comment CAD -Code Max_PDOP Max_HDOP Removed? Tag_Number DBH SPECIES CONDITION Comment CAD Max_PDOP Max_HDOP R 1238 18.0 Ash Green Good TRED 3.2 2�2 r 1395 12.0 Maple Sugar Good TRED 3.0 1.9 r 1966 20.0 Ash Green Fair 2 trunks -Code TRED r 1241 20.0 Boxelder Poor 3tru TRED 5.9 3.4 r 1396 20.0 Ash Green Poor TRED 2.7 1.2 r 1967 17.0 Walnut, Black Fair TRED 3.5 3.8 2.3 2.4 r 1242 22.0 Walnut, Black Good TRED 9.9 5.7 r 1397 13.0 Walnut, Black Good TRED 3.2 1.5 r 1968 10.0 Boxelder Fair TRED 3.2 1.4 r 1243 14.0 Boxelder Fair TRED 5.5 4.3 r 1398 13.0 Walnut, Black Good TRED 2.5 1.6 r 1969 15.0 Ash Green Fair TRED 3.4 1.6 r 1244 37.0 Oak Red Good TRED 3.0 1.7 r 1399 13.0 Walnut, Black Good TRED 3.9 2.7 r 1970 13.0 Walnut, Black Fair TRED 4.7 2.2 r 1245 11.0 Spruce Good white TREC 2.1 1.0 R 1400 15.0 Maple Sugar Good TRED 2.8 1.7 r 1971 12.0 Elm American Fair TRED 3.9 1.7 r 1245 11.0 Spruce Good blue TREC 2.1 2.7 1.7 1.0 R 1401 12.0 Boxelder Poor TRED 2.9 2.0 r 1972 13.0 Walnut, Black Fair TRED 3.5 1.8 r 1246 11.0 Spruce Good blue TREC 5.0 2.4 R 1402 23.0 Ash Green Good TRED 3.0 1.7 r 1973 16.0 Ash Green Good TRED 3.0 1.9 r 1248 14.0 Spruce Good blue bluenor TREC R 1403 22.0 Ash Green Good TRED 3.0 1.9 r 1974 16.0 Walnut, Black Good TRED 3.0 1.6 r 1248 14.0 Spruce Good TREC 3.5 1.4 R 1404 18.0 Boxelder Good TRED 4.8 3.0 r 1975 14.0 Ash Green Good TRED 3.0 1.3 3 r 1253 11.0 Elm American Good TRED 4.9 1.5 R 1405 13.0 Boxelder Good TRED 3.7 2.3 r 1976 12.0 Ash Green Fair TRED 7.8 7.0 M M o r 1254 12.0 Walnut, Black Good 3 trunks TRED 3.7 2.7 R 1411 18.0 Boxelder Poor TRED 3.1 1.4 r 1977 40.0 Oak Red Fair TRED 6.7 3.2 U r 1255 51.0 Maple Silver Poor 2 trunks TRED 2.8 2.3 R 1412 25.0 Ash Green Poor TRED 2.5 1.5 r 1978 28.0 Ash Green Good TRED 4.4 1.6 0 a) r 1256 10.0 Boxelder Good TRED 3.2 1.5 R 1413 19.0 Boxelder Fair TRED 5.5 2.6 r 1979 14.0 Boxelder Good TRED 3.0 1.1 _ o r 1257 10.0 Boxelder Poor 3 trunks TRED 2.5 1.4 R 1414 15.0 Ash Green Poor TRED 2.9 2.1 r 1980 12.0 Boxelder Fair TRED 2.6 1.3 o 3 r 1258 12.0 Walnut, Black Good TRED 3.0 1.4 R 1415 16.0 Boxelder Poor TRED 2.2 1.5 r 1981 11.0 Boxelder Fair TRED 3.7 1.3 r 1259 12.0 Walnut, Black Poor TRED 4.1 3.7 r 3416 16.0 Boxelder Fair TRED 3.5 2.1 r 1982 18.0 Boxelder Fair TRED 3.6 1.3 N N 3 r 1260 16.0 Walnut, Black Good TRED 3.3 1.6 r 1983 18.0 Boxelder Fair TRED 2.6 1.3 R 3417 11.0 Boxelder Fair TRED 2.6 2.1 r 1261 11.0 Walnut, Black Fair TRED 7,2 2,0 R 1418 10.0 Boxelder Good TRED 2.8 2.2 r 1984 10.0 Boxelder Poor TRED 2.9 1.2 r 3262 11.0 Boxelder Good TRED 6.5 2,0 R 1419 12.0 Boxelder Good TRED 2.7 2.2 r 1989 11.0 Boxelder Poor TRED 2.9 1.4 0 z r 1263 17.0 Ash Green Poor TRED 5.0 2.7 r 1991 21.0 Walnut, Black Fair ED TIRED 3.0 1.5 O R 1420 17.0 Hackberry Good TRED 3.0 2.0 r 1264 18.0 Tree Other Fair burr oak TRED 6.6 2.7 r 1992 16.0 Boxelder Fair 3 trunks TRED 2.8 1.4 0O G R 1421 22.0 Maple Sugar Good TRED 3.0 1.7 W r 1265 12.0 Boxelder Fair TRED 3.6 1.6 r 1996 11.0 Ash Green Fair TRED 3.4 1.5 a u r 1266 12.0 Ash Green Good TRED 4.8 2_1 R 1422 14.0 Boxelder Good TRED 1.6 1.0 r 1997 10.0 Walnut, Black Fair TRED 2.8 1.3 z z ° "' < a R 1423 24.0 Maple Sugar Fair TRED 3.7 2.4 Walnut, Black Good TRED 3.3 1.7 7 �- w � < w M O R 1424 20.0 Elm American Good TRED 4.0 2.7 .0 r 1271 14.0 Boxelder Poor TRED 13.4 4.3 228 3735.0 = o Z Z U R 1320 12.0 Boxelder Poor TRED 2.7 1.7 R 1425 21.0 Ash Green Good TRED 4.5 3.9 S 1237 12.0 Ash Green Poor TRED 3.9 1.9 w > Z a R 1430 11.0 Boxelder Good TRED 2.9 1.9 - 3 R 1321 18.0 Boxelder Poor TRED 2.8 1.8 S 1239 16.0 Ash Green Good TRED 3.4 2.1 z ��i, o 0 R 1431 20.0 Maple Sugar Good TRED 3.1 1.8 g o N w R 1322 22.0 Boxelder Poor TRED 3.0 1.7 S 1240 12.0 Walnut, Black Good TRED 2.9 1.6 a w < < R 1323 12.0 Boxelder Poor TRED 2.2 1.4 R 1438 13.0 Butternut Good TRED 5.1 2.8 S 1250 52.0 Willow Fair weeping TRED 3.9 2.5 ^ U ,- R 1439 31.0 Tree Other Good white poplar TRED 2.8 2.2 O '•' R 1324 26.0 Boxelder Poor TRED 2.5 1.7 s 1272 12.0 Boxelder Fair TRED 4.5 2.6 R 1325 12.0 Boxelder Fair TRED 5.6 3.3 R 1440 19.0 Walnut, Black Good TRED 3.2 2.0 s 1273 11.0 Boxelder Fair TRED 2.2 1.3 < ,. M 1 y o O ce R 1326 22.0 Boxelder Good TRED 2.5 1.5 r 1441 12.0 Boxelder Good TRED 2.5 1.8 s 1274 11.0 Boxelder Fair TRED 2.8 1.5 m <. < p 3 F r 1327 17.0 Boxelder Fair white poplar TRED 2.6 1.7 r 1442 11.0 Boxelder Good TRED 6.7 3.8 s 1275 10.0 Boxelder Fair TRED 2.8 1.3 WU M< < gLi 1328 13.0 Tree Other Good TRED 2.1 1.3 r 1443 41.0 Boxelder Poor TRED 4.8 2 5 s 1276 10.0 Boxelder Poor TRED 2.8 1.3 > - _ < r 1329 16.0 Tree Other Good white poplar TRED 2.7 1.7 r 1444 17.0 Boxelder Fair TRED 3.0 1.5 s 1277 13.0 Boxelder Good - TRED 4.1 1.7 w w Q r r 1445 16.0 Boxelder Poor TRED 3.0 1.6 s 1278 16.0 Boxelder Fair TRED 4.1 1.3 < o 32 r 133 1.0 Basswood Fair 6trunks TRED 2.9 1. = 0 N o r 1446 30.0 Ash Green Good TRED 5.1 1.6 s 1279 18.0 Boxelder Fair TRED 6.9 1.8 r 1331 122.0 Boxelder Fair TRED 2.9 1.55 1332 23.0 Tree Other Good burr oak TRED 3.5 2.6 r 1447 18.0 Walnut, Black Good TRED 5.3 1.7 s 1280 12.0 Boxelder Fair TRED 4.0 1.3 r r 1448 41.0 Tree Other Good burr oak TRED 3.0 1.5 s 1281 10.0 Boxelder Good - TRED 5.9 3.6 r 1333 17.0 Boxelder Poor TRED 4.7 2.5 1334 16.0 Elm American Good TRED 2.9 1.7 r 1449 13.0 Walnut, Black Good TRED 2.6 1A s 1282 17.0 Boxelder Poor TRED 2.6 1.2 r r 1450 10.0 Spruce Poor white TREC 4.2 1.4 s 1283 15.0 Boxelder Good _. TRED 2.6 1.1 r 1336 40.0 Tree Other Fair white poplar TRED 3.8 r 133 Tree Other Good white poplar TRED 8. 3 3..7 r 1451 11.0 Boxelder Good TRED 5.8 1.8 s 1284 14.0 Boxelder Fair TRED 2.7 1.5 133.0 7 .0 13Walnut, Black 138 Fair TRED 3. .1 r 1452 13.0 Cedar,Red Good TREC 2.9 2.0 s 1285 16.0 Boxelder Fair TRED 3.5 1.9 r r 1453 29.0 Ash Green Fair TRED 4.1 3.3 s 1286 14.0 Boxelder Fair TRED 2.7 1.4 r 1338 12.0 Willow Fair TRED 3.33 11.55 r 1454 16.0 Maple Sugar Fair TRED 2.8 1.4 s 1287 13.0 Boxelder Fair TRED 2.8 1.4 r 13 12.0 Elm American Good TRED 8. 3. r 1455 24.0 Maple Sugar Poor TRED 3.2 2.2 s 1288 18.0 Boxelder Fair TRED 3.0 1.7 r 1340 12.0 Cedar,Red Good TREC 2.99 3.22 r 1456 19.0 Oak White Good TRED 3.8 1.7 s 1289 14.0 Boxelder Poor TRED 2.8 1.7 r 1341 18.0 Cedar, Red Good TREC 4.0 1.7 r 1457 23.0 Maple Sugar Poor TRED 5.9 1.7 s 1290 12.0 Boxelder Poor TRED 5.9 2.0 r 1342 10.0 Cedar,Red Good TREC 2.9 1.8 r 1458 18.0 Maple Sugar Poor TRED 3.0 2.1 s 1291 12.0 Boxelder Poor TRED 2.6 1.4 r 1343 12.0 Ash Green Good TRED 2.9 1.2 r 1459 11.0 Maple Sugar Poor TRED 2.2 1.4 s 1292 10.0 Boxelder Fair TRED 4.3 2.1 r 1344 10.0 Cedar,Red Good TREC 2.3 1.3 r 1460 1&0 Maple Sugar Fair TRED 3.0 1.7 s 1293 21.0 Boxelder Fair TRED 2.8 1.7 Z r 1345 10.0 Cedar,Red Good TREC 2.9 1.3 r 1461 14.0 Boxelder Fair TRED 3.4 1.9 s 1294 13.0 Boxelder Fair TRED 2.9 1.5 ( 1 r 134.0 Cedar,Red Good TREC . 3. r 1462 14.0 Tree Other Good white poplar TRED 4.2 1.9 s 1295 14.0 Boxelder Fair TRED 2.8 1.3 r 1347 2222.0 Cedar,Red Good TREC 55.55 3.22 r 1463 15.0 Tree Other Good white poplar TRED 5.8 4.3 s 1296 20.0 Boxelder Poor TRED 3.0 1.6 J J Z r 1348 13.0 Cedar,Red Good TREC r 1464 15.0 Tree Other Good white poplar TRED 2.6 1.3 s 1297 12.0 Ash Green Poor TRED 4.3 2.1 W r 1349 13.0 Cedar,Red Good TREC 6.2 6.2 2.6 2 9 r 1465 41.0 Tree Other Good white poplar TRED 3.0 2.4 s 1298 13.0 Boxelder Fair TRED 3.7 1.7 N r 1350 15.0 Cedar,Red Good TREC 5.9 2.7 r 1466 19.0 Tree Other Good white poplar TRED 5.0 3.0 s 1299 11.0 Boxelder Poor TRED 2.9 2.0 r� (•' Q r 1351 12.0 Cedar,Red Good TREC 3.0 2.2 r 1467 12.0 Cedar, Red Good TREC 2.9 1.7 s 1300 10.0 Boxelder Poor TRED 2.9 1.6 r 1352 14.0 Cedar, Red Good TREC 4.0 2,4 1468 11.0 Cedar, Red Good TREC 3.0 1.9 s 1302 17.0 Boxelder Good - TRED 2.7 1.5 Z Z r 1353 12.0 Cedar,Red Good TREC 3.5 2.2 r 1469 12.0 Cedar, Red Good TREC 3.1 1.7 s 1302 17.0 Boxelder Poor TRED 2.7 1.5 Q O r 1354 23.0 Cedar,Red Good TREC 2.9 1.4 r s 1303 110 Elm American . Good TRED 25 1.5 F- r r 1355 14.0 Cedar,Red Good TREC 3.2 2.2 r 42.0 Tree Other Poor D white poplar TRIED 2.7 1.8 s 1304 15.0 Aspen, Quaking Good TRED . 5.8 J = Z 1356 16.0 Cedar,Red Good TREC 2.9 2.1 r 1471 23.0 Tree Other Good white poplar TRED 3.0 1.4 5.2 W r r 1472 21.0 Tree Other Good white poplar TRED 3.5 2.0 s 1305 14.0 Aspen, Quaking Good TRED 3.0 1.8 O r 1357 20.0 Oak Red Good TRED 3.2 1.8 s 1307 11.0 Aspen, Quaking Good - TRED 2.3 1.6 Q 1-1 r 1358 14.0 Boxelder Good TRED 2.7 1.9 r 1473 11.0 Oak White Good TRED 3.0 1.4 s 1308 13.0 Aspen, Quaking Good - TRED 2.5 1.7 W r 1359 15.0 Walnut, Black Good TRED 3.0 1.8 r 1474 20.0 Tree Other Good burr oak TRED 6.9 3.2 s 1308 13.0 Boxelder Fair TRED 2.5 1.7 w Q W r 1475 17.0 Walnut, Black Fair tree has beer TRED 3.0 2.0 O rZ' r 1360 10.0 Ash Green Fair 3 trunks TRED 7.4 3_0 s 13 1.0 Boxelder Good TRED 2. 1. H r 1476 21.0 Tree Other Good burr oak TRED 3.3 2.0 r 1361 12.0 Ash Green Good TRED 3.2 2.4 s 1310 111.0 Boxelder Good " TRED 2.33 1.4 r 1477 13.0 Tree Other Good burr oak TRED 2.9 1.8Cy- r r 1362 19.0 Ash Green Fair TRED 2.8 1.5 s 1311 11.0 Boxelder fair TRED 2.5 1.4 Z r 1363 13.0 Ash Green Good TRED 3.0 1.6 r 1478 26.0 Ash Green Good TRED 3.5 2.2 s 3312 13.0 Boxelder Poor TRED 1.9 1.1 w r 1364 15.0 Ash Green Good TRED 2.8 1.8 r 1479 18.0 Ash Green Good TRED 3.6 2.0 s 1313 10.0 Walnut, Black Good TRED 2.5 1.6 (n 1365 19.0 Ash Green Poor TRED 2.7 1.9 r 1480 13.0 Ash Green Good TRED 3. . 02 2 s 1314 10.0 Walnut, Black Fair TRED 3.7 2.3 J r 1366 21.0 Walnut, Black Good burr oak TRED 3.2 2.3 r 1481 22.0 Boxelder Poor TRED 3.0 1.7 s 1315 12.0 Walnut, Black Good TRED 3.7 2.3 W r r 1367 16.0 Boxelder Good TRED 2.2 1.3 r 1482 10.0 Cedar,Red Good TREC 2.5 1.5 s 1316 19.0 Walnut, Black Good V TRED 2.9 1.5 �z r 136 8 14.0 Boxelder 14.0 Good TRED 3.4 3.4 2.2 r 1483 23.0 Oak Red Good TRED 2.5 1.3 s 1317 16.0 Boxelder Poor TRED 2.4 1.4 Q 136 Boxelder Fair TRED 2.2 r 1484 24.0 Boxelder Good TRED 2.9 1.9 s 1318 15.0 Boxelder Poor TRED 2.9 1.8 r 1370 16.0 Boxelder Fair TRED 2.0 1.1 r 1485 11.0 Elm American Good TRED 2.9 1.5 s 1319 19.0 Boxelder Poor 2 trunks TRED 3.9 2.6 r 1371 15.0 Boxelder Poor TRED 2.7 1.2 r 1486 13.0 Elm American Good TRED 2.7 1.8 S 1406 19.0 Ash Green Good TRED 2.4 1.1 r 1372 12.0 Ash Green Good TRED 2.8 1.3 r 1487 11.0 Spruce Poor white TREC 2.0 1.1 S 1407 11.0 Ash Green Good TRED 2.2 1.1 r 1373 14.0 Boxelder Fair TRED 3.1 1.4 r 1488 14.0 Walnut, Black Good TRED 5.6 3.0 S 1408 19.0 Ash Green Good - TRED 2,7 1.6 r 1374 12.0 Boxelder Fair TRED 4.4 1.5 r 1489 11.0 Boxelder Good TRED 2.7 1.8 S 1409 12.0 Ash Green Good - TRED 7.1 3.3 r 1375 15.0 Boxelder Poor TRED 5.6 4.8 r 1490 13.0 Cedar,Red Good TREC 2.7 1.1 S 1410 19.0 Ash Green Good - TRED 4.1 1.9 r 1376 16.0 Ash Green Good TRED 3.7 2.7 r 1491 12.0 Spruce Poor white TREC 3.6 2.1 S 1426 19.0 Boxelder Poor TRED 2.8 1.7 r 1377 12.0 Boxelder Good TRED 2.9 1.8 r 1492 11.0 Cedar, Red Good TREC 3.0 1.9 S 1427 16.0 Elm American Good - TRED 5.5 3.2 r 1378 11.0 Ash Green Poor TRED 4.2 1.9 r 1493 18.0 Oak Red Good TRED 3.0 1.7 S 1428 13.0 Boxelder Fair TRED 6.3 3.8 r 1379 18.0 Ash Green Fair TRED 3.2 2.0 r 1494 16.0 Honeylocust Good TRED 3.7 2.3 S 1429 13.0 Boxelder Good - TRED 2.9 2.1 r 1380 16.0 Walnut, Black Good TRED 3.0 2.1 r 1495 14.0 Cedar, Red Good TREC 6.7 2.8 S 1432 21.0 Ash Green Good - TRED 3.4 2.3 r 1381 11.0 Ash Green Good TRED 3.0 1.3 r 1496 20.0 Ash Green Good TRED 3.4 1.8 S 1433 31.0 Boxelder Poor TRED 2.7 1.9 r r 1497 11.0 Boxelder Fair TRED 2.1 1.5 S 1434 13.0 Boxelder Fair TRED 2.7 2.0 r 1382 17.0 Elm American Good TRED 3.0 1.7 NO REVISION DATE r 1498 11.0 Boxelder Good TRED 4.5 4.2 S 1435 13.0 Ash Green Fair TRED 2.9 1.8 1 4/1/2016 r 1383 13.0 Ash Green Poor 4 trunks TRED 3.2 1.6 r 1499 27.0 Ash Green Good TRED 5.6 2.8 S 1436 13.0 Boxelder Good TRED 5.0 2.8 r 1384 20.0 Ash Green Good TRED 3.3 2.2 CITY SUBMITTAL 1385 12.0 Boxelder Poor TRED 3.0 1.6 r 1500 15.0 Ash Green Good TRED 2.8 2.0 S 1437 14.0 Boxelder Poor TRED 2.9 2.1 r r 1955 15.0 Walnut, Black Good TRED 3.1 1.8 S 1949 17.0 Boxelder Poor TRED 7.5 2.4 r 1386 12.0 Walnut, Black Good TRED 2.9 1.5 r 1956 11.0 Walnut, Black Good TRED 3.1 1.6 S 1950 11.0 Boxelder Fair TRED 5.4 2.9 r 1387 12.0 Ash Green Good TRED 2.8 1.6 r 1957 11.0 Walnut, Black Good TRED 2.5 1.5 S 1951 15.0 Boxelder Fair TRED 7.1 4.2 r 1388 16.0 Ash Green Poor TRED 2.9 1.6 r 1958 10.0 Boxelder Good TRED 2.9 1.6 S 1952 14.0 Boxelder Fair TRED 3.6 2.7 r 1389 15.0 Ash Green Good TRED 3.5 2.3 r 1959 11.0 Boxelder Fair TRED 3.7 1.7 5 1953 13.0 Boxelder Poor TRED 5.0 4.1 r 1390 17.0 Ash Green Good TRED 2.8 1.8 r 1960 15.0 Boxelder Poor 2 trunks TRED 2.9 1.6 S 1954 16.0 Boxelder Good �- TRED 5.3 2.7 r 1391 18.0 Boxelder Good TRED 2.8 1.3 r 1961 17.0 Boxelder Fair TRED 3.3 1.7 S 1985 11.0 Boxelder Good -- TRED 4.5 1.6 r 1392 16.0 Walnut, Black Good TRED 4.3 2.1 r 1962 11.0 Boxelder Fair TRED 3.3 1.9 S 1986 16.0 Boxelder Good -- TRED 3.4 1.2 r 1393 23.0 Walnut, Black Poor TRED 45.8 17.1 r 1963 13.0 Boxelder Poor TRED 2.9 1.9 S 1987 13.0 Boxelder Good TRED 3.0 1.6 r 1394 14.0 Elm American Good TRED 3.7 1.4 r 1964 16.0 Ash Green Good TRED 5.9 2.3 S 1988 18.0 Boxelder Good TRED 2.9 1.4 SURVEY 1965 16.0 Ash Green Good TRED 4.2 2.4 S 1990 12.0 Butternut Fair TRED 4.9 2.4 S 1993 11.0 Ash Green Good TRED 3.6 2.1 DRAWN RTM, S1S DESIGNED MRP S 1994 11.0 Ash Green Good TRED 2.6 1.2 S 1995 11.0 Ash Green Good TRED 4.3 2.9 CHECKED MRP S 1999 24.0 Cottonwood Good 2 trunks TRED 3.7 1.8 APPROVED MRP S 2000 11.0 Ash Green Fair TRED 2.9 1.6 PROD. NO. 193803412 SM 1251 29.0 Walnut, Black Good TRED 3.2 2.4 SM 1251 24.0 Ash Green Fair 2 trunks TRED 2.7 1A 85 1270.0 SHEET NUMBER C0.03 Z W O F (� 0 Uri Sw W 60�w z5w0 =z Z 3: ,9 N.Ci wZzw 6 ILi 5 �00� QOar m O2T W Q O W A H Z m o ?< w<¢a z 000zi '2C1 LL < Z W w w�o � O � N OW y lnr z <,< zza- OTC. UUii� w �<wa, �o�o D ZONING - SETBACKS THE PROPOSED ZONING FOR THIS PARCEL IS "RSF" SINGLE FAMILY RESIDENTIAL ZONING MINIMUM LOT SIZE = 15,000 SQ. FT. FRONT SETBACK = 30 FEET REAR SETBACK = 30 FEET SIDE SETBACK = 10 FEET MINIMUM LOT WIDTH = 90 FEET MINIMUM LOT WIDTH FOR NECK OR FLAG LOTS = 100 FEET MEASURED AT FRONT BUILDING SETBACK LINE. MINIMUM LOT DEPTH = 125 FEET MINIMUM RIGHT OF WAY WIDTH = 60 FEET VARIANCE REQUESTED LOTS: LOT 5, LOT 8, & LOT 9 a 41 �t o U•�iN z STREET LIGHT 20' TRAIL, UTILITY & 1 DRAINAGE EASEMENT 5' CONCRETE TRAIL / 1 I I I 1 I cY' rw 30' BLDG. SETBACK zo I rn � FROM BUFFER o �/ r CITY DRAINAGE 25' WETLAND BUFFER ; EASEMENT S88°17'20"E o ; 330.76 I 1 I I L OUTLOT 1 33,738 WETLAND (MANAGE 2) LOT NUMBER LOT 5 LOT 8 LOT 9 I 1 -- ----------------, I I I I I I I I , I , VARIANCE REQUIRED LOTS (FLAG LOTS) * LOT FRONTAGE LOT FRONTAGE MIN. LOT WIDTH LOT WIDTH MIN LOT AREA "POLE" PROPOSED LOT PROPOSED LOT 714J MIN REQ. PROPOSED AT FYSB PROPOSED AT FYSB FLAG AREA, FLAG "POLE" AREA FLAG "POLE" NOTINCLUDED NOT INCLUDED INCLUDED 30' 30' 100, 110, 15,000 SF *25,795 SF 27,283 SF C 30' 59.83' 100, 101.42' 15,000 SF *15,146 SF 15,956 SF 30' 37.03' 100, 100.47' 15,000 SF *161 SF 18,556 SF 4J LOT TYPE & BLDG. PAD SIZE DRAINAGE IL UTILITY EASEMENTS 3 LOT NUMBER TYPE PAD SIZE LOT 1 WO 80'X75' LOT 2 WO 70'X80' LOT 3 WO 70'X80' LOT 4 WO 80'X80' LOT 5 WO 80'X80' LOT 6 LO 70'X70' LOT 7 LO 70'X80' LOT 8 LO 70'X80' LOT 9 LO 70'X70' LOT 10 WO 701 LOT 11 WO 80'X70' LOT 12 WO 70'X80' REAR -�--------, ----- ----- 'o ii 'o 'F--5 C2 I I it I 3 Z -C LO i � � 0 ° FRONT o I a w � N Z BEING 10 FEET IN WIDTH AND ADJOINING O w w STREET RIGHT OF WAY LINES, 5 FEET IN WIDTH Z R�z� AND ADJOINING LOT LINES AND 10 FEET IN <v o 0 WIDTH ON REAR LOT LINES AS SHOWN ON THIS LL Z PLAT, UNLESS OTHERWISE DIMENSIONED. w ° o E zWOO a0`4W azw� LEGEND MO=w Ww = BOUNDARY LINE r 0 O =0<3 ------- ------ EASEMENT LINE w z ¢ g w U << w w W LOT LINE rw< w a w < F Q .. w 3< z w 0 HOUSE PAD it h — BUILDING SETBACK LINE PEDESTRIAN RAMP I 66- / , ,• I I I CURB AND GUTTER I o i u ,� Y;I --_ ,'9`1'9 7 i '12, � ::" i I I CENTER LINE OF ROADWAY EDGE OF SIDEWALK I 15,465 SFOT `---------- %�Q r I G` 80' j j / • -� , I I I l i i /' /� CITY DRAINAGE EASEMENT W 1 _ , 60, I J " O L---- , I ' -, 41, / / o ___-- ------------------- I I 25 WETLAND BUFFERLn 1--1-----, r_________________ I I 30 11 1 o^ ----- i� / B '' i I I I In I 1 N I I I I i BLDG. SETBACK CD \'E/ o '' 23,314 SF 1 I' NOTES: Z z < r I I FROM BUFFER I ` 1. ALL DIMENSIONS ARE TO BACK OF CURB. U 6 I�� 12 _ cq 18,254 SF o \ ti > 41,761 SF I of N SURMOUNTABLE CURB '" '`- = ' ' Rit &GUTTER i % e'-i i i G 1 �TLOT 2 - I 70' o \ \ 322 43' \ \ 1 75 _ I I I �- s N I 80.00 -------------- ,.- �o. WETLAND I I�,%' I 97. 4' \ >. I ' ) 16 - I 5 CONCRETE SIDEWALK N87012'20"W �------------ -' � (MaNa I I10'AT FYSB 94`87 `�/ ►�,, S� `��•�\ '" ; I I 80' is I 16 I 1 / - 90.01, ylak.t A` DEVELOPMENT DATA I I �C i I ao' � �� --- ----_`�.;... � `. S I OP UMENT (LOCA ETERMINED) AREA IN SQUARE i II i I i ff lf 9 `-BEGIN SURMOU B� LE I i B618 CU & GUTTER FEET 27283 SF 4 CURB '25,795 SF a UTTE,� GROSS PROPERTY 390,563 SF i I i /' fl I i /i \ ' .\ ` I I PEDESTRIAN RAMP �\ G 24'712 SF I \ > AREA w �� ig '' f f \ f r I I o '), 10 i �� f f f 70f % 13tsz B618 CURB &GUTTER EXISTING R.O.W. 38,687 SF 'Cr I ; ; I GP fN 18 538 SF ________ / / / (R.O.W. of Lake Lucy Road N N i CITY DRAINAGE i I fti fl it ' 16 OPT. ENTRY MONUMENT I / LOCATION TO BE ERMINED & Yosemite Avenue within Z I 1 i / f f f o I w e Property Boundary) I i EASEMENT I i i I fl f1 GP fl 2 i Bo PROPOSED R.O.W. 41 629 SF i - _J ;,^� - / fl fl fl' ; 16,063 SF fl fl/ �'/ ,'' S' CONCRETE SIDEWALK r--r-- 1 (R.O.W. of proposed Y. . ./.. ' i 5 �'-�-- l „ „ 1 • . , J/ I / l / ; / 1 ' - • 30' UTILITY & CITY Street A) I I i : % ' ; i i / i / ' i /, .. may/ r-�-_ J l I I r i /' WETLANDS r �, J f n 1' I DRAINAGE EASEMENT 32 948 SF : ; ,'� ,/ ->_- / / GP 20,678 SF (Total Wetlands area i L — i /� r ; 'WET POMP % �/' /,r / 9b / / 9 / / / / / / / / / / T-_ Q located In OUtlots 1& Z /' /' i ,/ I/ ) G � / ' • I I WETLAND BUFFER 17,404 SF (Total Wetland Buffer area-r->--� -� -r' - /�--,f %/ / / . , / / / / ; ,/ / rT ; / ,SAN located in OUtlots 1 & 2) Y! -` / / r--r\�� / i i i 1 ' .12 REfEI�LTIC!� / / y ' / i /' ' i i / / / / I INV =1007. 4 /i10' / ' ' / > _ _'i - / / L•_ _ / / I / l i ./ 1, / , / L / / ?�.::/ /---r}-t- / / l'/'i' i /'I I INV E=1007.9 INV W=1007.96 9Y95' NET LOTS & 259,895 SF ----------------- ,. � < . z�1o',/ , J EXISTING BITUMINOUS TRAIL — — — — — — — — — — — — — — — . / —LI . PONDING - -- - - - - - - - - - - - - - - - - - - - - - - d — (Remaining area area of gross ! s a �_� ' ' '__--__ _ _ _ ' — — — —_ _ _ — — — EXISTING BITUMINOUS TRAIL — — property less existing & proposed R.O.W.'s, 250.00 Wetlands, and Wetlands - - — a�=a= -_ I L-/—\r \L_ L_lJu I------------- NETDENSITY 259,895 SF/ — .. — .. — .. — .. — .. — .. — .. — .. — .. r-==__==_ma=s-------\U-N88°03'48"W====-------==- ALLOWANCE 15,000 SF/LOT =17.33LOTS —.—..—..—.....— PROPOSED 12 NUMBER OF LOTS BACK OF CURB- R.O.W. LINE o--- -------- I 1 30' FRONT SETBACK LINE I I I I I LU LU Z I I , I I Q BUILDING PAD v 1 m VARIES PER m 5; ru SITE w 15 I Ln 1 C1 W p I L *G 30' REAR SETBACK LINE I I I I I 1 I I I I EASEMENT \-LOT LINE r{ ` DENOTES TYPICAL *G = GRAVITY SEWER DRAINAGE AND *GP = GRINDER PUMP LOTS UTILITY EASEMENTS UNLESS OTHERWISE TYPICAL LOT DETAIL SHOWN ON THE PLAN. NOT TO SCALE N (k 0 40 80 W N Q z Q g a U a Q 0 LILI � a J LU Q NO REVISION DATE 1 4/l/2016 3/04/16 CITY SUBMITTAL SURVEY DRAWN RTM DESIGNED RLH, MRP CHECKED RLH APPROVED RLH PROD. NO. 193803412 SHEET NUMBER C1.01 z w 0F V w o arm „5! o�-�w Z132 o�� cam Z3.�,0 LDS � wZ�w S .naQ rcr Wm 2 m�W yo 22-1 ya3� mZ�Z O Oza Z-¢? LLEZw W K W 6 J O 0 N < 0 ¢ O o Z aa�< z?H O3Ow W ¢ W 0 i w It, i �fr-Z-rrrr ACREAGE SUMMARY EXISTING IMPERVIOUS AREA 0.7 ACRES NEW IMPERVIOUS AREA 3.5 ACRES TOTAL DISTURBED AREA 6.0 ACRES 1 � ❑ 1'0 � �I I l I❑ ❑ ' I • I I •V1 I / \\� ' ; I OUTLOT 1 ' T �• r v 1 O t I v 1 I I I I I I I o N \ \\Cy \ ", WETLAND p (MANAGE 2) \ \ `_ _ �• � � � \� � / = BIOROLL, MINIMAL DISTURBANCE. WEAVE = G .t -- r -' �" \\ '� I BETWEEN EXISTING / / <J \I � �``•. �� ` _ ;.•:C•=�"=lS : w I I I I TREES. if 1 I I _ '0a - I, 1012 I l I -------w-oN,--J ---- o r SEDIMEITFT i I I \ o /0' , 1 BIOROLL, MINIMALI10200 DISTURBANCE. WEAV E08 °'I 1 1 i 1 / t Q ( I BETWEEN EXISTING o/ /\ `�I 1 Il i ° r \ I �'1 l I I TREES. \ V / 11 I 1�ti 0') 41 I�I'11 10 8 ! / 1 OUTLOT 1 x I-- / _ 1018 �- i I I I, I to I i O <> \ 4+pp \ �--t--1---- ' '^ _ '�, I :I WETLAND (MANAGE 1)Ic i I 1111 4- 1016 1016 I� �— \/ t I 1070 7011, — // N / ! 994 � 1 v I 101 0 40 80 I / I , 992 , — 101c // \ — I I 990 1 \ 994, l/ ,1010 �2 1 I l i°tiv ° , v T ?48 tUL1E Tl / I 1 j4� < <� SANMH=1021.12 10AQ I I I '3I ! I INVE=1007.94 / - INV W=1007.96 / EXISTING BITUMINOUS TRAIL J — }` �'_ -- - -- - EXISTING BITUMINOUS TRAIL g ` G`B ... INV N=8.4 I A I i f- rn - B m s G INVS=8.45 - L�� \ L L LJ I - _ j g\ ( l � --- 996 \4 992---- STMH=995.3�5, \\ \ --`\ \ \ Jo \\ \\ �016/ 990 FNu S-7. avi \ \ \ \ \ 1 ---------_.-i I J • CLVi - 1 r � 1P EROSION AND SEDIMENT CONTROL NOTES: 1. ALL PERMITTEES, CONTRACTORS, AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PLAN AND THE STATE OF MINNESOTA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES PHASE II PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS AND IS RESPONSIBLE TO COMPLY WITH ALL REQUIREMENTS STATED WITHIN. 2. THE BMP'S SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS FOR THE ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES, THE PERMITTEE/CONTRACTOR SHALL ANTICIPATE THAT ADDITIONAL BMP'S MAY BE REQUIRED AS SITE CONDITIONS CHANGE AND SHALL PROVIDE ADDITIONAL BMP'S TO MEET APPLICABLE REQUIREMENTS. 3. ALL WORK AND MATERIALS SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS AND SWPPP. ANY DEVIATION FROM THE APPROVED PLANS SHALL REQUIRE WRITTEN APPROVAL FROM THE OWNER. EROSION CONTROL LEGEND MS MACHINE SLICED SILT FENCE HD HEAVY DUTY SILT FENCE WB WIRE BACKED SILT FENCE SD SUPER DUTY SILT FENCE BR BIOROLL FLOTATION SILT CURTAIN XXXXXXX ROCK LOG wRIP RAP ® INLET PROTECTION DITCH CHECK - BIOLOG Q^ DITCH CHECK - ROCK CULVERT / PIPE PROTECTION TEMPORARY SEDIMENT BASIN W/ PIPE DRAIN SEDIMENT TEMPORARY SEDIMENT TRAP DIVERSION AND PIPE DRAIN JJJJIIII==0000000o SANDBAGS •���► CONCENTRATED SURFACE FLOW CONCRETE WASHOUT BLANKET ++++++++++++ TEMPORARY + + + + + + HYDROMULCH + + + + + + NO SEED SEED MULCH HYDROMULCH SOD TURF REINFORCEMENT MAT (TRM) vvvvvvvv OTHER APPROVED BEST v v v v v v v v MANAGEMENT PRACTICE vvvvvvvv (BMP) CONSTRUCTION ENTRANCE / EXIT V 4J r to 3 m E O U T 3 z U z m r � c to O N m co in fY 2 Oz wow m _N Z �ww ZW a�� O U Z LL�'7W'z U How Zwoo goZW zz� aW W� '2d U.n �O=W ti W J F a 0 >00 rioa3 w m _ z wt2 a z z �3<m a J J cn J 0 LLJ LLJ 0 04 a J Z H W z cn O N U Q = z Z w Q Q U IL � Z Q z O O O U Lu w ZD _r Lu d QJ w F_ NO REVISION DATE 1 4/1/2016 CITY SUBMITTAL SURVEY DRAWN RTM, SJS DESIGNED RLH CHECKED RLH APPROVED RLH PROJ. NO. 193803412 SHEE ^/T NUMBER C2.01 z 0 F U � O Q Y Q � � W z W z�wp 002.9 0- LL Q F O N wa% Jtiaa 02� ao�r m O�w� W 2 K K m�NO zm0� z O=QQ .zoz z OOzi z-¢� LL�zr wO.0 >poN <0< �0 � uzmz <;0¢ 0 zz O-OW u 3: 0 mwmw ,0i0 w W N P 1 I GENERAL NOTES: 1. BENCHMARK: V I 1 2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS INCLUDING LOCATIONS, RIM AND INVERT ELEVATIONS OF EXISTING DRAINAGE AND SANITARY STRUCTURES, I LOCATION AND SIZE OF EXISTING SANITARY AND WATER STUBS AND EXISTING I I GRADES. I I 3. EXERCISE BEST MANAGEMENT PRACTICES (BMP'S) TO MINIMIZE EROSION AND SEDIMENTATION DURING CONSTRUCTION. USE SILT FENCE AND CATCH BASIN TW 1O23 �'1018 \ ' PROTECTION TO MINIMIZE SEDIMENTATION OFF SITE OR TO PUBLIC OR PRIVATE BW 1017 STORM SEWER SYSTEMS. oti BW 1015 ❑ GRADING LIMITS ❑ I 4. SEE SHEET 08.01-08.02 FOR MISCELLANEOUS DETAILS. 4 -- _ 5. SPOT ELEVATIONS ARE FLOWLINE AND/OR FINISHED GRADES UNLESS OTHERWISE 3 M E INDICATED BY LOCATION OF THE SPOT. 1 rOr2 ; ! 6. ALL PROPOSED ELEVATIONS ARE TOP OF PAVING OR GUTTER UNLESS NOTED 3 Z / ! "---'-""71-""" 1016 / OTHERWISE. PROPOSED ELEVATIONS ARE SUGGESTED ELEVATIONS TO PROVIDE t `/ f'• r 'Tl 1018 i - ! ';� i - / POSITIVE DRAINAGE TOWARDS CATCH BASINS OR OUTLETS. THE CONTRACTOR = H I--`-- 1020 I I ,. ; r / i / I SHALL BE RESPONSIBLE TO VERIFY THESE AND PROVIDE THE REQUIRED 3 / / O O O RAG 101Q: i I ELEVATIONS TO PROMOTE POSITIVE DRAINAGE THROUGHOUT THE PARKING LOT. N H 33 / 1-+ 1 O22 I I i �� / 7. PLACE SILT FENCE AT ALL LOCATIONS THAT EROSION MAY OCCUR. PROPOSED SILT / �� % •iO "T �' ' I I -TLS 1011. I ' / , Ov�� � / I-+ p> - Q j I �' ' j ;j I I � FENCE WAS PLACED WHERE THE ENGINEER ANTICIPATED SILTATION OCCURRING. QtitiC3 I V V O I ✓ 1 I MFF 1020;6 / ' J i CERTAIN CONSTRUCTION PRACTICES OR UNANTICIPATED CONDITIONS MAY r-----Y�--------� z� �}I REQUIRE THE PLACEMENT OF ADDITIONAL SILT FENCE. THE CONTRACTOR SHALL p z wo I O: i I- I I 'I,\ I i / ) i t I PLACE ADDITIONAL SILT FENCE AS NEEDED TO ENSURE THAT NO SILT WILL LEAVE � O z i I \i- P THE SITE, WHICH INCLUDES BUT IS NOT LIMITED TO ENCLOSING THE ENTIRE SITE. 11, � z �_ 1 i O2 FGG 1019.0° • I I it 1 N / ' 8. CONTRACTOR SHALL MAINTAIN EROSION AND SEDIMENTATION CONTROL DEVICES Z N-N- I ., I I `, I---1-O--N -- _ \ I 1 I KO . I i \ 1 I / I I SUCH AS CATCH BASIN PROTECTION, SILT FENCE, ETC. UNTIL PAVING IS a z F �' I �• I INSTALLED AND GRASS OR SOD IS ESTABLISHED, NO MORE EXISTING VEGETATION O w N 9i z \ \ \ 111\ l \ b •I I i I WETLAND / j ' \ i \ i I' I SHALL BE DISTURBED THEN IS NECESSARY TO COMPLETE THE SITE WORK u o LL i Z. TW 1026 \\ \ !J _ \ IT �O�ry _. _- \\ O , l l ' I �$� s I li I INDICATED ON THIS DRAWING. N a \ -n ,3 _n - [�. 1 -- - \ N O E I r r'� I I I 9. WOOD FIBER BLANKET SHALL BE PLACED ON ALL 4:1 SLOPES AND DRAINAGE z u, O BW 1021 \ \ 'T-^ -TI G7 1- j - \ \ O O f, I I I I I I I AREAS TO PREVENT SCOURING. a z z Q I...d V/ O i, I I !\ I V i I I I I U N O F. T )I ti j I� 10. SEED, MULCH AND FERTILIZE ALL DISTURBED AREAS. (SEE SPECIFICATIONS). = O } _ I! �� cp NJ O F+ i J I ��� \ " 1 � \ ��; ` '1 ° °° I j �1 I I I I 11. NOTIFY ENGINEER IMMEDIATELY IF ANY DISCREPANCIES ARE NOTED BETWEEN \� EXISTING CONDITIONS AND CONDITIONS NOTED ON THE PLANS WHICH ARE LL p ¢ 3 yI I I I ` �� � ✓d r\ �� �\S` /! /� % I I Ii I � SIGNIFICANT ENOUGH TO ALTER THE INTENT OF THE DRAWINGS. 12. NOTIFY ALL UTILITY COMPANIES BEFORE CONSTRUCTION AND VERIFY LOCATION OF w z -1--- , I ¢ FL 19 \ \� \ 1 r / �' �) : I I ALL UTILITIES BEFORE BEGINNING WORK. w ,,, p p z z ¢� a in 13. THE DEVELOPER/BUILDER SHALL KEEP BUILDING SITE MATERIAL CONFINED TO THE ;� ,�.''� !y I ! I I BUILDING SITES VIA ROCK ENTRANCES AT EVERY DRIVEWAY AND SILT FENCE L HP \ - - / . / ! \ �'w / I I I PROTECTION TO CONTROL EROSION THAT MAY ERODE OFF SITE ONTO THE RIGHT- j ' 9.6 FL 19.78 r • _�\ ��� �'� /%�_ / \�' GRADINOrrIMITS I I OF -WAY OR INTO LOWER ADJACENT AREAS. THE ROCK ENTRANCE SHALL BE ^A TI I/ r ;% x " FL 18, •t: \ `1 I /� z UTILIZED BY EVERY VEHICLE THAT ENTERS THE SITE. INV {...a ,,,,,• �+% / I , ` I �, / /'-��,.• • // ' I I I I 14. EXISTING VEGETATION INCLUDING TREE ROOTS SHALL BE PRESERVED WHEREVER CDI T" I y = i / i !(�•4 --/ •: ` i i� I JI I POSSIBLE. 00 I ;•� / I 3°IO % \ • _ i 2 I _ 15. EROSION CONTROL DEVICES SHALL BE INSPECTED IMMEDIATELY AFTER EACH X F 19,26 RAINFALL AND DAILY DURING PROLONGED PERIODS OF RAINFALL, ANY REQUIRED V - i 1 ,\$ \ i ---- I I r'/ \ �; �rs f,..• i I I I I REPAIRS AND/OR MAINTENANCE ACTIVITIES SHALL BE COMPLETED BY THE 19 0 0 CONTRACTOR IMMEDIATELY. 00 - 01 k 1 �' ; 11.5 - - 1 iU -------------- / - i 1012 v _ J \\ it \ �16. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY SHALL O _ j' " ' CREACH APPROXIMATELY ONE THIRD OF THE HEIGHT --- - --•�-� Ny.fN� fir_ T-_I? i c r '. I I TLS 12,0 - 1014'"_ \\ 11 ! ,. // I I ICI I OF THE SEDIMENT BARRIER 1 iois RFG 1 \ �. I I I, Z I -1,66 -_,_- I 1 J, I 17. THE CONTRACTOR SHALL REMOVE EROSION CONTROL DEVICES WHEN THEY HAVE ` o ^ _ o FL I I i I I I G L SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS L lv,�No N// / �18.7 1020 I 1i J i •A N O O 'II N \ < O WO 10j8 TLS 1011 I y. /' ; , I / I I I I BEEN PERMANENTLY STABILIZED TO THE EXTENT THAT, IN THE OPINION OF THE "'�>..� i \ A /CTI A Al li} IQ I I I ENGINEER, EROSION AND SEDIMENTATION ARE UNLIKELY TO OCCUR. J Z 1`�� I FGC� 1020.0 I I P4FF 1020.E : /( E I L.ANI,1v I w I s h-+ I"-` I""' 1--� 1 I - - III I / : I I I 18. THE CONTRACTOR SHALL DESIGNATE AN AREA FOR THE WASHING OF CONCRETE to I O I"^-� / / `• ' \�� / I / III I V1O j • t '� II I I I TRUCKS, THAT DOES NOT ALLOW THE WASTE CONCRETE TO CONTACT THE SOIL Cn �FL - --,II \ �I J I II FGG 019. o� I I" ( I ILI (WATER TIGHT CONTAINMENT), Q / / / �` 18. 1 I' _ / I 101$I II /pI I I f - 19. FAILURE OF THE CONTRACTOR TO PERFORM WITH THE ABOVE MAY RESULT IN Z = 1 O1$ ` j _ ----- I I I I I - STOPPAGE OF WORK. THE CONTRACTOR SHALL CORRECT ANY NON -CONFORMING Z Z I / i -- 1 �O •X' - -I`- i/ i I 11 WORK, AS DETERMINED BY THE ENGINEER, WITHIN A 24 HOUR PERIOD OF Q Q g \ `\` I 1 I i I I I I I NOTIFICATION FROM THE ENGINEER, FAILURE BY THE CONTRACTOR TO CORRECT J = a -- --, / / / �P FL 17.78 - .� . - I 1 I ' LI I SAID WORK AS INDICATED SHALL ALLOW THE ENGINEER TO ORDER THE / , 1 - -- -_ 1 /� / �! 4s \ 1 11 I i I r I I CONTRACTOR TO STOP ANY AND ALL WORK IMMEDIATELY AND TAKE ANY ACTION O v Z -1_.L_f-- ---`'/ �\FL17.28 /f T�c�l o J �i _ iJ T1N IO25 :% �- - 1 \ i / I NECESSARY TO CORRECT SAID WORK. ALL CLAIMS, COST, LOSSES, AND DAMAGES I + I -BW -102.2 --ao/ L ;t �616O O O• I I / I RELATED TO THE CONTRACTOR FAILING TO PERFORM AS DETERMINED BY THE 0 1018 / j �� \ \ 7- a' "FL 16.78 '' ` I ENGINEER) INCURRED OR SUSTAINED BY THE CITY AND/OR OWNER IN EXERCISING Q a TW 102�2 f I�O �/ d / v - -�,. �.• �`` ro / /3+00 SUCH RIGHTS AND REMEDIES WILL BE CHARGED AGAINST THE CONTRACTOR. W O ( 7 BW 1099 00 ~� �� 1020 /�: \ 1017 - 196 \ \� TW 1011 \ I I \ \ / �� 1 3 I TC 'c 20. ALL MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY CODES, RULES, AND / / /\ �` \- / 16.28 \� 5W 1007 TW�OIid 1 0 1 I REGULATIONS MUST BE FOLLOWED. BW 100 I 21. ALL STORM SEWER APRONS SHALL HAVE RIPRAP ACCORDING TO DETAILS. L1 .7 ------ --- I I w U jv W i a 101E \ ! / ! I '` t I - ! ! 1'--_ '` \ 22. CONTRACTOR MUST CONTACT PAUL OEHME AT THE CITY OF CHANHASSEN, MN ENGINEERING J I C , / r o I r0r4 �O I DEPARTMENT AT 952-227-1165 FOR ALL STREET AND UTILITY INSPECTIONS. O Lu 1014 G� 1 �, / �, ' I ! I 1 _ 5.-. �(\ ! l ! ,`,� Or �5-2 FL\ \ . FL FL / I I Q TLSv101._.,_..__ I 12 F ,/ FG .r. _ 1s. 12b�.5 SITE GRADING NOTES: J / 10 niF 1 ` ' G OZ i / /! 10j6 F1 15. T+0 / 6 �L g3 a L RFG 1012.5 I I 1010 �1$ ! / ! 6 i / ! / \ �1 0 01 h • I 1. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR I % rs`•. ! ! {�( ! ! L J \ / ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON �$ �. ! r \ 10.5 I !! ` MF ,� _ �! � .- l� � � � RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, RFC 1oo81s ` l ` 9 F 10, 66 FGG - - �/ r Imo- rOr2 I I MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY THE FIELD 1010 yp� j O ! 7 ! , T, 1 �16•S l ! I __ _- - I I I LOCATION OF ALL PUBLIC AND PRIVATE UTILITIES PRIOR TO CONSTRUCTION. THE 1008 �11 I ` L ` ` ! l !I ) I `- \` I I CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT (651) 454-0002. IT 100E %�' 1` , l ! ; / / f 1018 I r01 r-14 f SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING f I 1004 ? �� I ! MFF 1 I r s.� 1 I I I UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE / 1002 , xs j6 r PLANS. /I I 1000' ��08. j lI! Iwu a _ � V7 I 2. EXISTING GRADE CONTOUR INTERVALS SHOWN AT 2 FOOT INTERVALS. ,� FGG 1018.5 I / - 996 _ __ _ ----- _ - _ � ° 08 � ! I ! E,�- � , � \ - i, o� I 3. PROPOSED GRADE CONTOUR INTERVALS SHOWN AT 2 FOOT INTERVALS. 7004 !-1, RFc 10 ! , WQ I f I I 4. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO I I / _ - �---_ 1002 / ! Og 0 , ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. / 995 ' I 1 -- rOp0 \ /l ! F 1020.1E I I' I 5. CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NO REVISION DATE 994 I 9g8 -` ! r I NATURAL AND PAVED AREAS. 12 / , 9bo6 ` 1008 r 0r6 O I 6. TOPOGRAPHIC INFORMATION TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND 1 4/1 /2016 \ 990 9 -�� loos 1 or4 '®.TCS 1fl10 a I ' / ! \� 9 5 ! ! - ! , rp w I SURVEYORS, IF CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN N1iA/L 9 5 + - ` 994 °\ ! I i - 1004 _ 1� ! / "r V 7 GAO IO.I `I1���0 ` I I ON THE PLANS, WITHOUT EXCEPTION, HE SHALL HAVE MADE, AT HIS EXPENSE, A CITY SUBMITTAL / I , 1 2'- ! l 0 `L '.1 I TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR AND SUBMIT TO THE 100o - ! y^ 1� ' - OWNER FOR REVIEW. / / / �___ /_ I _ ! / I 7. ALL SPOT ELEVATIONS ARE TO FLOW LINE UNLESS OTHERWISE NOTED. / % T --------- ---' �- - ! T I / ! ! OL i 4 I SAN MH=1021.12 I ` __ / 1p1p I INV E=1007.94 LvrI I � � ' •� I FRONT OF PAD c)HP/ R �- -� I I FGG 900.0 FRONT GARAGE ELEVATION J EXISTING BfIGMINOUS TRAIL- --_ =OHP_ - - - - - -- -- I ` I- Z ? �I _� -- HOUSE TYPE: FFULL BASEMENT _ -OH�� - - _ - - - - - - -' - CB=999.18 _ _ =�- _ -� - - WO LO-LOOK OUT, WO -WALK -OUT � " - _ _ _ _ _ = _ _. �_ - E)(ISTING 8ITUMINOUs TRAIL ! INV N=6.30 - - - - ` g MFF 901.6E MAIN FINISHED FLOOR ELEVATION N suave - - ' I C'`8 GB TLS 892.0 TOP OF LOWER BASEMENT SLAB INV N=8.4 I A I i {-- �, rn m ! DRAWN I I / \ / L_ )� - - _ _ _ _ _ _ RFG 891.5 REAR FINISH GRADE 5-8.45 L t ! - - - - . INV-1 --ems --__-__-_ REAR OF PAD I L /-\ � \ ', L \-/ I ` � DESIGNED 998--- - _ ��-\ \.� =_ __=-<_-=sa -\ CHECKED - ' '----' _ \\� _ - _``--\ APPROVED ### \ \ I -_--. _ I1008 OOq �->>0 \ \ j474 \ (. / - PROD. NO. 193803412 - - - 992 - - _ STMH=995.3,qS� \ \ - - _ \ \ \ ro \ io16 \ 0 40 80 / ZIWTV37.3- I \ \ \ \ `• _ -- -- SHEET NUMBER 990 \ \ �� ---------- I - - -__ C3.01 Z m O _ Qrcol �gw W W Z�Fo oZ 0 .a� OFp�n 7Zzw o'0a JU°y.N < m oow° �2Q� Zm�o z= mN° 0QaZ o°Z Z-= LL�Iz^w K O v Wmmo 0 >. J C N W Ur�r <<Oz < ZZ� O oaow ? W ,o,o G N Z X -L---- - i SMH 4- RIM=1019.58 INV (S)=1011.06 ----T- I I 1 I I 1 I I I I I I I I I I 1 I I 1 I I I I L______________ r------------- -- -------- 1 I- I I I I I I I I � I I I I 6 � 1 ` I ` I I 1 ` ` I I I � -- SMH -- RIM=1017.96 ' NOTE' I OUTLOT 1 7 ' --- I I I i 150' -81, PVC 11 0 I @ 0.4 /o 1 I V it ' J L WETLAND (MANAGE 2) I r I I I 1 I I I I I I I I I I I I I I I I I I I I 12 I I lilt �-295' -811 PVC @ 0.4% I I I I I I � I❑ •W -_ REF � / I a I INV (NW)=1009.18 1I1- I t n 1 j PVC C I I TYPICAL 1" 'I \ �� / I I @ 0.4% J I 4 WATERI SERVICE _- ISMH 1 RIM= f j i %TYPICAL 4" 3 1 j I INV (SE)=1008.58 \ I ! I / SANITARY SERVICE - I I INV (NW)=1008.68 it r.�) I I I j i I,. 1' 1 I 1' 1' L �' 1 / V 155' -8" PVC I � I @ 0.4% 1 1 I 14 .. I..� 1 r - - CONNECT EXISTING WATERMAIN I I -------- j------------------ � �---- r18" CUL T1 - ... ... ; �� �� « y I I J SAN MH=1021.12 IN E=1007.94 - .I . ...------------'--- -- ---------- L------ INV W=1007.96 CLVT -� -- OH' - ! • yr J' --- ----- ---------------- I I OHP -> --- > EXISTING BITUMINOUS TRAIL L T - - - - - - - - -OHP - - QHe - - - SLIP- _ - -- _I -- - CB=499 i8 =--_ _ = _ --_� - = _ _ - - EXISTING BITUMINOUS TRAIL \ B - INV N 6 30 ! - - EXISTING FIRE m G-13 G°as- - G-B - INV N=8.4 1 A ffYB - - - m - L) EXISTING WA INV S=8.45 L _ r� EXISTING FIRE =i _tea--=------------ = ----VALVE _= 1s HYDRANT =�---------- STMH=995.39 / INV N=7.3 -- - INV S=7.32 \'• CLVi I • CLVT SMH 2 INV (SW)=1010.36 itI _ I RIM=1015.20 LOTS 2-4 SERVICE LATERAL WIIJL NOT BE INV (N)-1010 46 \ '1 '�' I� I INV SE -1009 08 ABLE TO SERVICE BASEMENT L EL BUILDER TO PROVIDE A GRIND PUP FOR BASEMENT LEVEL AND TO SUIT SERVICE LATERAL AS NECESSA FRC CONNECTION POINT TO HOME. YSTE � IS DESIGNED TO PROVIDE GRA ITY SEWER TO THE MAIN FLOOR LIVING AREAS. I �I EXISTING FIRE - HYDRANT SITE UTILITY NOTES: 1. ALL FILL MATERIAL IS TO BE IN PLACE, AND COMPACTED BEFORE INSTALLATION OF PROPOSED UTILITIES. 2. CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITIES INSPECTORS 72 HOURS BEFORE CONNECTING TO ANY EXISTING LINE. 3. MINIMUM TRENCH WIDTH SHALL BE 2 FEET. 4. ALL UTILITIES SHOULD BE KEPT TEN (10') APART (PARALLEL) OR WHEN CROSSING 18" VERTICAL CLEARANCE (OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE). 5. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 8'-0" COVER ON ALL WATERLINES. 6. IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATERLINES, SANITARY LINES, STORM LINES AND CAS LINES (EXISTING AND PROPOSED), THE SANITARY LINE SHALL BE DUCTILE IRON PIPE WITH MECHANICAL JOINTS AT LEAST 10 FEET ON BOTH SIDES OF CROSSING, THE WATERLINE SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE THRUST BLOCKING AS REQUIRED TO PROVIDE MINIMUM OF 18" CLEARANCE. MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AWWA C150) (CLASS 50). 7. LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED AND APPROVED BEFORE BACKFILLING. 8. TOPS OF EXISTING MANHOLES SHALL BE RAISED AS NECESSARY TO BE FLUSH WITH PROPOSED PAVEMENT ELEVATIONS. 9. ALL CONCRETE FOR ENCASEMENTS SHALL HAVE A MINIMUM 28 DAY COMPRESSION STRENGTH AT 3000 P.S.I. 10. DRAWINGS DO NOT PURPORT TO SHOW ALL EXISTING UTILITIES. 11. EXISTING UTILITIES SHALL BE VERIFIED IN FIELD PRIOR TO INSTALLATION OF ANY NEW LINES. 12. REFER TO INTERIOR PLUMBING DRAWINGS FOR TIE IN OF ALL UTILITIES. 13. CONTRACTOR IS RESPONSIBLE FOR COMPLYING TO THE SPECIFICATIONS OF THE LOCAL AUTHORITIES (CITY OF MINNEAPOLIS) WITH REGARDS TO MATERIALS AND INSTALLATION OF THE WATER AND SEWER LINES. 14. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY THE FIELD LOCATION OF ALL PUBLIC AND PRIVATE UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT (651) 454-0002 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 15. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL CONNECTION OF SERVICE. 16. CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. 17. REFER TO ELECTRICAL PLANS FOR SITE LIGHTING ELECTRICAL PLAN. 18. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, INCLUDING BUT NOT LIMITED TO, ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS & POLES, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. PROPOSED UTILITY LINES -FM-FM-FM FORCE MAIN SANITARY SEWER >- SANITARY SERVICE ----------------- STORM SEWER DRAINTILE » » » STORM SEWER 1 I 1 WATER MAIN -I -I -I -I -I -I -I -I -I- WATER SERVICE - > - PIPE CASING PROPOSED UTILITY SYMBOLS • SANITARY CLEANOUT MANHOLE SANITARY OR STORM LIFT STATION ® STORM SEWER BEEHIVE CATCH BASIN ■ STORM SEWER CATCH BASIN 2 Oz Wo Zw o'>." W W a O a a UVp� O W LL�wz-L OLLO_ U J W a ��f LL n Z Z a �W� a F Q J W � = ti W< a LL < } W m<y �0�3 � wwa3 Uaa�-W < w mw=. W d 0 Z a W "'azzz z R w 0 a =3a= a . o INOIREVISION DATE 1 1 4/1/2016 CITY SUBMITTAL ►- STORM SEWER FLARED END SECTION m STORM SEWER OUTLET STRUCTURE ® STORM SEWER OVERFLOW STRUCTURE m DRAIN TILE CLEANOUT • CURB BOX N SURVEY DRAWN RTM T FIRE HYDRANT DESIGNED RLH ► WATER REDUCER (:k CHECKED RLH APPROVED RLH 1 VALVE PROD. NO. 193803412 0 40 80 ODO� RIP RAP SHEET NUMBER °°° 0 C4,01 z ° W F U4� Vi W Z�wa °Zm '^t�0 z3 OFp� uz,z�w ��w .ndzZ- afar m oow° �dQ0 W m�yo z o-,za a�3 a m z oOz i Z a� LL2T K O CZ� N Q 0 O <0<° ° z L� Z <<a< w��o u 3:u W �K W �oo Z x N M 0 41, Id N Z x N m I i I I I BOTTOM OF BASIN - REFER TO GRADING PLAN SIDE SLOPES - REFER TO GRADING PLAN BIORETENTION POND BOTTOM - REFER TO LANDSCAPE PLAN FOR COVER TYPE. MULCH ry 80% MNDOT SELECT GRANULAR BORROW MODIFIED 5% AND 20% GRADE 2 COMPOST 1014 7 1010 ,* • --� 3" MNDOT 3149.2.H, COARSE FILTER 1016 ' 0�2 i •' AGGREGATE. 1 / i / 6" PERF. DRAINTILE WITHOUT SOCK / o // / 1018 , t- / ( BIORETENTION BASIN / / co / / / ti 1020 1 'i 1022 i / : i NO SCALE QIf / �AtiOO /' I I 1 ----_- -- -- of---- --- a rOUTLOT 1 ' v-N ; I 1 si co o , t I r$ i oI?. FES E - I I I %WETLAND I INV=1010.00 MANAGE2 T _ , ( ) \• + j � � I `l� I I I I I STMH - '� \ \ \ , \ a,- \--''�' I RIM=1015.00 INV (NE)=1011.00 / -- r 01 t 1 I o DRAINTIL ((Y;' 6-15" RCP I CLEANOUT i \ �' 1 ---- - @ 1.8% FES INV=1013.50 I 1 I i N .1� I \ 1012 1 ' --- -- ------ w-a N --7-/ �® \ i 1014 ---- - \ : �roN oo //o / \ < 1 38' -12" RCP // i ES 6 �No" I ,�/ i \ \ -F / 101 i I I i /l I I wi o / �/ ^� / _ w @ 0.9% 1 s 1 1 1 // /f IQ I I INV (S)=1006.70 rn Y \1� ��I�lil i j I I/ / I'TLOT 2 1' Ill�ill� 1 / CBMH 2 �\ I 3-12" RCP I 1 OU; _ ' I --� 23' -12" RCP RIM=1017.15 018 0 o @ 0.9 /o INV (S)=1013.85 \ II �i > @ 1.0% - 11 INV NW 1013.85 ; - �• ` ' I L - -- ( )_ 4 i 1 WETLAND I 11 I I a v (M ANAG �i e o- E 1) --7------7----- \ \ / _ - 01 A} III - BMH 7 1018 _ \ - -A ' , ;\ lq 1 RIM=1009.46 If QD 1020 ; : \ ` i INV (N)-1006.47 I ` `` --- ---- --- 1 ' // / /" \ \�of2 INV (S)=1005.47 / // / .. CBMH 1 - \1 r°ro \' / i 2 %� 9p I I 36' -12" RCP RIM=1 17.13 \ � \ , t t �_, - i /� �a , -- - 0 _ I _ \ \\[ I - - 1016 \ ` \, ` �` t. I @ 1.0°/O ._-- / / INV N 1014.13 I I If 1p10 \ \ / l� t o ---CBMH 8 I `• ' / " - \ \ / I RIM=1010.57 / ,/ / 1 ; I \ ' PERFORATED `a / DRAINTILE CURB ��/ Y �''- \r�\2 I i INV (N)=1005.11 / 11( 1o10 \ I INV (S)=1005.01 I _ loos \` �� i � /�_ `� � RAINTILE �-�., �� � r I 1004 / ' loon ' `\ % \ ' CLEANOUT 1076 IOy V \ " / i I I `` `� 125 -15 RCP �= 1002 1 1 i i \ 1 �' / 1 i i \ I ° g9811 60' -15" RCP ' - - \ \ \ FES -g 6- 1 1 --_ `- __-- 16 o `\ \ 178' -15" RCP \ 1- INV=995.0 ; 1 �4 0- _ r--- _ rol @ 1.5 /o _ \� 2.1% \ I I STMH 9 s a r I RIM=1019.00 \ 0j4 = I 1 �\ �ss4, , - 1004 °' / 1p�2 I I I ,,�°tie I INV (N)=1003.96 1 L. i `._. 1002- r /� - 0 -., ; I Zq' I I �/% �/ I i - ; I �' I 1poo y' �" I `v 1 !_T ( INV (W)=1003.66 _ l� L / -f -- 27 -18 RCP / ,� , o , pl `< � , QI I '�: SAN MH=1021.12 INV 1007941007.96 ----- V Ilk =. / -- NS @ 7.9% INV W= EXISTING BITUMINOUS TRAIL - - - - - - - - OHP IXIS,TING BIT OUS TRAIL- - C-B - ------- ' CB=999.18 -___ �_------ INV N=6.30 ES 12 - ES 10 G-B _ - _ STMH 11 rn m G-B - _ INV N=8.4 INV=995.00 1 1 I /-, , , - RIM=1001.00 INV=1001.00 .... L_U\J -- -- ------ -_- - aria- INV=995.90 _-_ ------------ 996 \4 992 STMH=9935..391, 990-l+aus=7.3z� �. avr --- , . CLVT / f -- - -If I / SITE UTILITY NOTES: 1. ALL FILL MATERIAL IS TO BE IN PLACE, AND COMPACTED BEFORE INSTALLATION OF PROPOSED UTILITIES. 2. CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITIES INSPECTORS 72 HOURS BEFORE CONNECTING TO ANY EXISTING LINE. 3. MINIMUM TRENCH WIDTH SHALL BE 2 FEET. 4. ALL UTILITIES SHOULD BE KEPT TEN (10') APART (PARALLEL) OR WHEN CROSSING 18" VERTICAL CLEARANCE (OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE). 5. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 8'-0" COVER ON ALL WATERLINES. 6. IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATERLINES, SANITARY LINES, STORM LINES AND CAS LINES (EXISTING AND PROPOSED), THE SANITARY LINE SHALL BE DUCTILE IRON PIPE WITH MECHANICAL JOINTS AT LEAST 10 FEET ON BOTH SIDES OF CROSSING, THE WATERLINE SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE THRUST BLOCKING AS REQUIRED TO PROVIDE MINIMUM OF 18" CLEARANCE. MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AWWA C150) (CLASS 50). 7. LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED AND APPROVED BEFORE BACKFILLING. 8. TOPS OF EXISTING MANHOLES SHALL BE RAISED AS NECESSARY TO BE FLUSH WITH PROPOSED PAVEMENT ELEVATIONS. 9. ALL CONCRETE FOR ENCASEMENTS SHALL HAVE A MINIMUM 28 DAY COMPRESSION STRENGTH AT 3000 P.S.I. 10. DRAWINGS DO NOT PURPORT TO SHOW ALL EXISTING UTILITIES. 11. EXISTING UTILITIES SHALL BE VERIFIED IN FIELD PRIOR TO INSTALLATION OF ANY NEW LINES. 12. REFER TO INTERIOR PLUMBING DRAWINGS FOR TIE IN OF ALL UTILITIES. 13. CONTRACTOR IS RESPONSIBLE FOR COMPLYING TO THE SPECIFICATIONS OF THE LOCAL AUTHORITIES (CITY OF MINNEAPOLIS) WITH REGARDS TO MATERIALS AND INSTALLATION OF THE WATER AND SEWER LINES. 14. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY THE FIELD LOCATION OF ALL PUBLIC AND PRIVATE UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT (651) 454-0002 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 15. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL CONNECTION OF SERVICE. 16. CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. 17. REFER TO ELECTRICAL PLANS FOR SITE LIGHTING ELECTRICAL PLAN. 18. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, INCLUDING BUT NOT LIMITED TO, ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS & POLES, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. PROPOSED UTILITY LINES FM FM FM FORCE MAIN > > > > - SANITARY SEWER -=-=-=-=-=-= === SANITARY SERVICE STORM SEWER DRAINTILE » » » STORM SEWER WATER MAIN -1-1I-1-I-1-1-1-1- WATER SERVICE > - PIPE CASING PROPOSED UTILITY SYMBOLS • SANITARY CLEANOUT MANHOLE SANITARY OR STORM LIFT STATION 0 STORM SEWER BEEHIVE CATCH BASIN ■ STORM SEWER CATCH BASIN ►- STORM SEWER FLARED END SECTION m STORM SEWER OUTLET STRUCTURE ® STORM SEWER OVERFLOW STRUCTURE (D DRAIN TILE CLEANOUT N • CURB BOX FIRE HYDRANT ► WATER REDUCER Z VALVE 0 40 noo ocb RIP RAP 0 V 4) 4J C 3 ,•, E o T n U a � ci z � � f � 0 o x � N N h oz� wOW -Z ww OVO� 0 Z UW =oW,z U a��E Z w OW o <22 a x a��LL ww =r<0 W c9 a3 K Ua w < w z azz 7) a a W N N = z Q g 2 Lu U w Q z O 0 0 J `L1J Y Q NO REVISION DATE 1 4/1/2016 CITY SUBMITTAL 80 SURVEY DRAWN RTM DESIGNED RLH CHECKED RLH APPROVED RLH PROD. NO. 193803412 SHEET NUMBER C5.01 Z O w F x U 0 arm „sw o��w zwa O pxzm t„o 0wo� Z U ,�Z�w o 0 0 Q QOaa m 0 m�QO N F z O J3¢ fQ��Z ❑OZZ< Z N y F LL�tZW �00 w� v0 a , N �Jo �o0 W y uz=Z <<o< zod° Z w U B: u o_o ih HYDRANTS SHALL BE CLOW MEDALLION OR WATEROUS WB-67-250 ALL HYDRANTS MUST BE APPROVED BY CITY THE HYDRANT MARKER SHALL BE A SPRING MOUNTED FIBERGLASS ROD 5' IN OVERALL LENGTH, FOR SIDE INSTALL MAGNETIZED MOUNT APPLICATION, USING RED & WHITE REFLECTIVE TRACER BOX (SNAKE TAPE WRAPPING OVER THE FULL LENGTH OF THE PIT) AS NEEDED PER ROD. DETAILS EXISTING OR FUTURE 5550,5501,5502 CURB OR GUTTER LINE HYDRANT VALVE BOX STREET 24" MIN. 2.0% 2 HYDRANT SHOE AND BARREL SHALL BE ¢ AS REQUIRED -10'- PLASTIC WRAPPED M TYPICAL PER SECTION 2.03a. ;0 z 1 CUBIC YARD OF J GATE VALVE TEE 1 1/2" CLEAR ROCK WITH ADAPTER AND 2 LAYERS OF POLYETHYLENE (4 MIL.) 8"X18"X5" SOLID CONCRETE BLOCK NOTES: 1. ALL HYDRANTS SHALL HAVE WEEP HOLES. 2. MINIMUM 7.5' COVER OVER MAIN. 3. ALL PAINTED SURFACES SHALL BE SUBJECT TO TWO YEAR WARRENTY PERIOD AS NOTED IN SECTION 2.09 OF THE WATERMAIN SPECIFICATIONS. 4. HYDRANT INSTALLATION SHALL INCLUDE A HYDRANT MARKER. 5. ALL JOINTS SHALL BE RESTRAINED VIA MEGA -LUGS MECHANICAL JOINT RESTRAINT. 6. ALL HYDRANT TO BE PLUMB TO VERTICAL AXIS, MAXIMUM ALLOWABLE TO BE 1/2" PER FOOT OF HYDRANT. 7,, HYDRANT TO BE SECURELY COVERED WITH PLASTIC WRAP OR BAG TO INDICATE THAT IT IS OUT OF SERVICE. �l l CITYOF TYPICAL HYDRANT R A N T �aA�l � INSTALLATION REVISED: 3-14 ENGINEERING DEPARTMENT PLATE NO.: 1004 FILE NAME: G: ENG SPECS 1004 Add Mastic Between Frame And Rings - Manhole Casting, Lid and Adjusting Rings (See Plates 2110 & 2111) Provide I&I Barrier on all sanitary sewer manhole(see plate 2109) Manhole steps shall be Neenah R-1981J, 16" on center. o Steps Shall be on Downstream Side Unless Pipe Diameter is 18" or Larger All joints in manhole to have "O"ring �- rubber gaskets. Infi-shield external seals or as directed by the Engineer. �- A Maximum of 2 Short Manhole 4'-0" Risers to be Used Directly Below Cone Section Pipe shall be cut out flush 5„ with inside face of wall. �Kor-n-seal required. ZSECTION VIEWmuMinimum thickness of precast base is 6" for 14' deep or less, and increases 1" in thickness for every 4' of depth greater than 14'. Precast Inverts Must be 1/2 of Pipe Diameter and Benches Sloped 2" Toward the Invert 1. Kor-n-seal manhole or equal considered acceptable alternate. 2. All dog houses shall be grouted on inside and outside, 3. When the manhole or catch basin structure is constructed outside the traveled roadway a witness post and sign (MH) shall be installed next to the manhole. CITIOF STANDARD MANHOLE REVISED:2-15 PLATE NO.: ENGINEERING DEPARTMENT 2101 FILE NAME: G: ENG SPECS 2101 Street PL Variable 6' Metal fence post denoting curb box. , Top 6" pointed blue. Curb box with 1 1/4" standpipe and stationory rod _ I Z_ g -Water Service 1"X1" Corporation Cock 1 Type "K" Copper Concrete Block Support Water Main NOTES: 1. Do not plug end of curb stop. 2. Add 6" crimped pigtail to curb stop. 3. The copper service line between the main and curb box shall be one continous piece of piping, splices will not be permitted 4. Corporation cock to be 1" x 1" inside diameter. 5. Saddles required on 6" DIP or smaller mains and all mains and all mains 12" or larger. 6. Saddles when required sholl be Ford style F202 double strap. 7. Stainless steel saddles required on all PVC Watermain. Cfff OF TYPICAL �111 WATER SERVICE REVISED:2-11 PLATE NO.: ENGINEERING DEPARTMENT 1005 FILE NAME: G: ENG SPECS 1005 1 1/2" LETTERS RAISED FLUSH FONT "BIRCH" CUSTOM LOGO RAISED FLUSH CONCEALED PICKHOLE PER NF 1015 2" LETTERS J1 -{ I 2 1/4" RAISED FLUSH � n MACH. GROOVE IN UD SEAT FO I- 3/4" OIL RESISTANT T-GASKET, -I- 1/8' NITRILE, (60 DURO) T-SEAL/CONCEALED PICKHOLE DETAIL GASKETED LIDS USED FOR SANITARY AND WATER MANHOLES 1 1/2" LETTERS RAISED FLUSH FONT "BIRCH" CUSTOM LOGO RAISED FLUSH CONCEALED PICKHOLE PER NF 1015 2" LETTERS RAISED FLUSH 1/10 1 1/2" LETTERS 5/16" RAISED FLUSH FONT "BIRCH" COMPONENT NUMBERS: Q CUSTOM LOGO ALL FRAMES ARE: RAISED FLUSH 1642 R l ® CHANHASSEN LOGO UD NUMBERS C .0 CONCEALED 5631 - SANITARY MANHOLES PICKHOLE rrrr _ STORM MANHOLES NF PERER NF 1075 5640 - WATER MANHOLES A ft 1.OLTS NOT REQUIRED UNLESS CALLED OUT IN SPECIAL CONDITIONS. 2. DIMENSIONS ARE IN ENGLISH MEASUREMENTS 3. CASTINGS MEET HS-25 REQUIREMENTS 4. MANUFACTURED IN USA 2 1/4' 5. QUAUFIES FOR LEED CREDITS lJ- 1" MATERIALS, 6. UD-CAST GRAY IRON, ASTM A-48 CLASS 35B 2" LETTERS ''�Il��"�J' 7. FRAME -CAST GRAY IRON, ASTM-A-49 CLASS 40A RAISED FLUSH CONCEALED PICKHOLE DETAIL S. FINNISH-BARE METAL NO PAINT OR COATINGS 9. WEIGHTS: FRAME 126 LES / LID 122 LBS � j p Or Vili MANHOLE CASTINGS C�fAHHASSEN AND LIDS DETAIL REVISED:2-15 PLATE NO.: ENGINEERING DEPARTMENT 2111 FILE NAME: G: ENG SPECS 2111 DROP LID 7.5" Minimum cover required WATER Tyler No. 6860 over top of water main. Mueller No. H-10361 Bibby -Ste -Croix No. B-5160 Provide Valve Stem Risers VTo Within 6" Of The Surface If The Distance From The Top Nut Of The Valve To The Surface Is Greater Than 8'. Grade TOP Tyler No. 6860 26" Mueller No. H-10361 26" Bibby -Ste -Croix No, VB502 27" EXTENSION Tyler No, 58 14" No. 59 18" No. 60 24" Mueller No. 58 14" No. 59 20" Bibby -Ste -Croix VB520 No. 57 9" VB521 No. 58 14" VB522 No. 59 20" V6523 No. 60 26" BOTTOM Tyler No. 6860 65" Mueller No. H-10361 65" Bibby -Ste -Croix No. V8516 60" 60" Valve and Box to be plastic wrapped per BASE section 2.03a Adjust top to 3/4" below grade. Box to be set to provide 12" of adjustment. Tyler No. 6860 Mueller No. H-10357 Bibby -Ste -Croix B-5001 Gate valve box, screw type, 3 piece, 5 1�4" shaft, size G box, 7'-6' extended, #6 round base - Gate Valve Adapter: 1/4" Steel With Protective Coating, 1/2 Rubber Gasket Installed Between The Gate Valve And Gate Valve Adapter. Mueller or American Flow Control Resilient Wedge Valve Conforming to AWWA LC-515-80 Standards With All Stainless Steel Nuts & Bolts. 18"X18"X8" Concrete Block W1OF TYPICAL GATE VALVE calm AND BOX INSTALLATION REVISED:2-09 PLATE NO.: ENGINEERING DEPARTMENT 1006 FILE NAME: G: ENG SPECS 1006 Compacted Normal Fill Material, Compacted to 95% of the Standard Proctor Density I _I I a _) Varies 1I- III-I (- Shaped Natural Ground to pipe NOTES: 1. When existing soil conditions are not acceptable for backfill and/or compaction in the pipe zone, pipe bedding and backfill shall be used as shown on detail plate 2201. 2. A soils engineer will be required to determine the depth of the pipe foundation embedment material if needed. Pipe foundation material shall be accordance with MNDOT 3149.2H course filter aggregate. 3. The Bottom of the Trench Shall be Shaped to Fit the Pipe Barrel for at Least 50% of the Outside Diameter. MOF PIPE BEDDING ��y�� IN GOOD SOILS �mtlildklritl RCP & D I P REVISED:1-10 PLATE NO.: ENGINEERING DEPARTMENT 2202 FILE NAME: G: ENG SPECS 2202 CL 01-1:,LI1.1a PL 9 z WYE PLUGGED EN[ a 1/8 BEND Uri 6" PVC SDR-26 PIPE MIN. SLOPE 1/4" PER FOOT J O 2"X2" MARKE - - - - T1/2 PIPE DIAMETER MIN. SEE NOTE 2. SANITARY SEWER GRAVITY MAIN ')ANITARY SEWER SERVICE CONNECTION DETAI ERVICES TO BE USED IN CONJUNCTION WITH PLASTIC PIPED SEWEF AINS FOR DEPTH OF COVER 16 FEET OR LESS. FENCE POSTS NOTES: 1. SOLVENT WELD ALL JOINTS. (NON GASKETED) WHEN SANITARY SEWER SERVICE IS NOT ACCOMPANIED BY A WATER SERVICE IN THE SAME TRENCH, INSTALL A 6' HEAVY METAL FENCE POST NEXT TO 2 X 2 MARKER AND PAINT TOP 6" OF POST FLORESCENT GREEN, 3. CLEANOUT REQUIRED ON PRIVATE PROPERTY IF DISTANCE FROM MAIN TO HOUSE EXCEEDS 90 FEET. 4, ALL PIPE SHALL BE BEDDED ON GRANULAR BORROW 314A OR COURSE FILTER AGGREGATE (3149H). affOF TYPICAL SANITARY CHARM SEWER SERVICE REVISED:3-09 ENGINEERING DEPARTMENT PLATE NO.: 2001 FILE NAME: G:\ENG\SPECS\2001 I� Compacted Backfill + + + + + + + + + + - _ + + + + + + + + + } + + + + + + + + + r + + + + + + Bc + + + + + _ Embedment 1- + + + + + O3Ba + + + I� Material + + + + + + + + + 1_ 6., �+ + + + + + + + + + Foundation - _I //////// �r If Required _I (see Note 1) "Be" Denotes outside diameter of pipe NOTES: A soils Engineer will be required to determine the depth of the pipe foundation embedment material if needed. Pipe foundation material shall be in accordance with MNDOT 3149.21-1 course filter aggregate. 2. P.V.C. bedding shall be MNDOT 3149.2E select granular borrow with 100% passing a 3/4" sieve, and less than 10% passing a NO. 200 sieve. W!of PIPE BEDDING � & FOR P.V.C. PIPE REVISED:2-10 ENGINEERING DEPARTMENT PLATE NO.: FILE NAME: G: ENG SPECS 2203 2203 V 4) 41 C M r E - 0 M L U N U 3 z m s � � _ o � i3n � � 3 co 04 3 07� wOw �=z > 7 0 Owz Zaw Ora¢ UV00 Oz w VI z LLo U w Z aY112 f zw�o QOZ� a�0F x a NwUn E ,O = _ < w Q2�W a 0 W C7 m y �pw�3 aC Q3 U a 7- = :2E w m � 2 � Z w a Q w w Z 3 =< Z a 0 < Ln J LU H N w Vj Q � Z o Q Z = H U Z Q LU U') Q U LL LL J LU - U Q NO REVISION DATE 1 4/1/2016 CITY SUBMITTAL SURVEY DRAWN CITY DESIGNED CHECKED RLH APPROVED RLH PROJ. NO. 193803412 SHEET NUMBER C9.01 Z O F x U Qr0 „Sw w o��� w zowo o°zm � 3 O °UO ,� wr U Z�w fNaz op0N ¢o�� m o�iE° w _�<ow m Ozm7� z� Q3Q K y K 2 w ' oo°zi a=„I LL�Zw Eoc51 w�w0 ° a N o;=Z <QOa zoaw ° 2 w 0¢Oj ?o?o `XNIMUM 6" OF — COMPACTED SAND PROPOSED SEWER O 18" MIN. SEPARA 3" STYROFOAM INSULATION TRANSITION TO SPECIFIED I ONE PIPE LENGTH DEPTH (TYPICAL). INSTALL VERTICAL BENDS WITH MEGA LUGS AS REQUIRED. WATERMAIN UNDER STORM SEWER NOTE: INSULATION AND COMPACTED SAND SHALL EXTEND 12" PAST OUTSIDE OF PIPE INSULATION SHALL OVER LAP AT JOINTS BY MIN. OF 12" �M�yp1�0F WATERMAIN/STORM SEWER �lml1�IB►1►lfill CROSSING REVISED: 2-10 PLATE NO.: ENGINEERING DEPARTMENT 2204 FILE NAME: G: ENG SPECS 2204 6" THICK COP COLLAR (TYP. NEENAH R-4342 GRATE OR APPROVED EQUAL 31" o .f 27"DIA X M 3 l� DIA CATCHBASIN (27" DIA.) DESIGN SPECIAL 2 CONC. ADJUSTING RINGS (2") MIN. 2 MAX. 4 MIN. 1/4" MORTAR BETWEEN CASTING, RINGS & STRUCTURE. MORTAR SHALL MEET MnDOT SPEC 2506.2B. — NOTE: REINFORCING TO CONSIST OF #4 BARS AT 8" O.C. BOTH WAYS WALLS TO BE PRECAST SECTION OR CONC. SEWER BLOCK ,PRE -CAST OPENING AS REQUIRED CONC. BASE SHALL BE 6" POURED IN PLACE OR 5" PRECAST SLAB QF TYPICAL 27" DIAMETER CATCH BASIN REVISED:2-10 PLATE NO: . FlLE NAME:G:\ENG\SPECS\3103 ENGINEERING DEPARTMENT 3103 FINAL GRADE b TRENCH V) O Q > MINIMUM 6" SAND FILL ---------------------- — �3F" MINIMUM _ _ _ _ RIGID STYROFOAM TIT FILL I INSULATION VARIES NOTE: PIPE SHALL BE CENTERED UNDER INSULATION UNLESS OTHERWISE SPECIFIED. INSULATION SHALL OVERLAP AT SEAMS BY MIN. 12 COVER OVER PIPE — a WIDTH OF INSULATING BOARD — b . 5' 5' 6' 3' Our INSULATION CHllil�l►11'i[I DETAIL REVISED:1-10 PLATE NO.: ENGINEERING DEPARTMENT 2205 FILE NAME: G:\ENG\SPECS\2205 NOTE: u�rmountable Curb & Gutter to be transitioned into a 8618 type at catchbasin. fo a Catchbasin Frame & Grote Neenah R-3067—V or lo VB Grate. NOTE Catchbasin to be depressed 2" below design gutter line grade. A Neenah R-3067—VB shall be use., ]at all low points. s�o r Surmountable Concrete Curb & Gutter 2—#4-60"Long Rebars Each way ISOMETRIC No Scale c O 0 5' Min. Transition 0 Top of °x Curb 2 _ _ _ — Design gutter line grade SECTION A -A No Scale O 5' Min. Transition o_ m c 0 X UJ 2—#4-60" LONG Rebars Each way Frame & Casting p CURB 171 V!! CONSTRUCTION AT CATCH BASIN REVISED:1-10 PLATE NO.: ENGINEERING DEPARTMENT 3106 FlLE NAME: G:\ENG\SPECS\3106 NOTE: 1— V Grate Shown 2— VB Grate Shown shall be used at all low points. Face of Curb —� Direction of Flow Catchbasin costing and grate Neenah R3067—V or equal 3' radius curb box. Precast concrete or HDPE adjusting rings_ Minimum of 2-2", maximum of 5-2" concrete adjusment rings allowed with 1/4"- to 1/2" bed of mortar between each and a 6" thick concrete collar on the outside. Doghouses shall be grouted on both the inside and outside. PLAN 24" x 3( Precast SECTION 0 I N �n Grate to be 2" below gutter grade. 5' transition curb on each side of catchbasin. ToD of Curb Varies 6 1/2" Varies 5,. 3' minimum 3" Grout 6"Min. base NOTES: 1. Steps shall be provided in all catch basin/manholes and storm sewer manholes. 2. Casting to be totally encased in concrete curb section. 3. No block structures are allowed. 4. No wood shims are permitted in the adjusting rings. CfffQF STORM SEWER CATCH BASIN 2' X 3' RECTANGULAR * CEM REViSED:2-10 PLATE NO.: ENGINEERING DEPARTMENT 3101 FILE NAME: G: ENG SPECS 3101 PLAN RIPRAP REQUIREMENTS NITS PIPE DIA. RIPRAP REQUIRED 12" TO 24" 8 to 12 CY CL.3 27" TO 33" 14 to 20 CY CL.3 36" TO 48" 23 to 38 CY CL.3 54" AND UP 62 CY and up CL.4 (One cubic yard is approximately 2,800 lbs.) NOTE GRANULAR FILTER REQUIRED UNDER RIP RAP AND 2 LAYERS OF 50OX MIRAFI FABRIC OR EQUAL Granular Filter (MNDOT 3601.2B) SECTION A —A Geotextile Filter Type III NITS RIPRAP N Granular Filter (MNDOT 3601.2B) SECTION B—B Geotextile Filter Type III NITS b111 or RIP RAP CIldlllls►w� DETAIL REVISED:2-10 ENGINEERING DEPARTMENT PLATE NO.: 3107 FlLE NAME,G: ENG SPECS 3107 24"x36" slab opening for Neenah R3067—V or equal i Note: 1— V Grate shown Q 2— VB Grates shall be used at all low o paints. Neenah R3067—V casting and grate or equal. PLAN Minimum of 2 maximum of 5-2" Conc. collar concrete adjustment rings with full beds of mortar. Precast concrete or HDPE adjusting rings. t1r �:1 n E D Varies 4'-0" Typ. ih Q S" 6" Qa a i y 6" precast reinforced concrete slob. Top of barrel section under top slab to have flat top edge sealed with 2 beads of Ramnek or equal. All joints in manhole to have "0" ring rubber gaskets. Precast concrete section NOTES: 1. Doghouses shall be grouted on both the outside and inside. 2. No block structures are allowed. Manhole steps, Neenah R1981J or equal, 16" o.c., Aluminum steps approved. Minimum slab thickness, 6" for 14' depth. Increase thickness 1" for each 4' of depth greater than 14', and reinforce with 6"x6" 10/10 mesh. Grout bottom of manhole to 1/2 SECTION diameter at pipe and slope grout 2" toward invert. M10r TYPICAL 4' DIAMETER CHIM CATCH BASIN MANHOLE REVISED:2-10 PLATE NO.: ENGINEERING DEPARTMENT 3102 FILE NAME: G:\ENG\SPECS\3102 See City Plate No. 3107 for riprop placement. ISOMETRIC NITS NOTES: 1. All Reinforced Concrete Aprons shall be furnished & installed without Trash Guards 2. All new Reinforced Concrete Aprons on new pipe shall be tied bock 3 pipe lengths back from apron. 3. All new Reinforced Concrete Aprons on existing pipe shall be tied to the first pipe adjacent to the apron. MlOr FLARED END SECTION c REVISED: 2-10 PLATE No.: ENGINEERING DEPARTMENT 3108 FILE NAME: G: ENG SPECS 3108 V W 4J 3 m E — o T � U a Z a) 7o = o M � � 3 ozw wOW �=z 'z O W LL Ora¢ QURW ~ O U W LL o z U LL Z_ J z z w00 �zz� a'WF x a �2 WC) Q��LL =rp0 YJ C7 �mQ,n O LLo <5 .. Uai-w w � w z z w W =3<5 a o L U) NO REVISION DATE 1 4/l/2016 CITY SUBMITTAL SURVEY DRAWN CITY DESIGNED CHECKED RLH APPROVED RLH PROD. NO. 193803412 SHEET NUMBER C9.02 z O w F x U 0 N W W z w�o 8 0 °Qm N F. J0� 0� N � Q Q d } 0 =o LLowH _E �t<o Zm2NO t, m Nnz z �o°$ S=-� LL FEZ w0wo J0JO o}�} z z-zd° U-zow U3U� ?o?o E 0 a .? U a �aQ N / X > N N v m oam c � o ma o a P It n x PL 4" Topsoil, Seed & Mulch or Sod. Draintile Surmountable Concrete Curb CL 30' 30' 15.5' to Back 15.5' to Back - Wear Course to be 1/2" -1 Above Edge of Gutter PL I 1 1 1 3.0% 2.0% 1.5 : 1 1' Draintile 1 1/2"-MNDOT 2360 SPWEB340B Tack Coat - 2357 2"-MNDOT 2360 SPNWB330B 12"-Class 5 Aggregate Base 24" MNDOT 3149.28 Select Granular Borrow (*See Note 7) N 1.NO M nimum Right -of -Way Required - 60'. 2. Maximum street grade 7.0%. 3. Minimum street grade 0.75%. 4. 4.0" Topsoil placed in disturbed areas. 5. 2 Rolls sod behind curb. 6. The bituminous wearing surface shall be placed the next construction season following placement of the bituminous base. 7. A test roll of the prepared subgrade shall be performed by the owner in the presence of a city inspector. The city has the authority to require additional subgrade correction based on the test roll. 8. Draintile shall be placed along both sides of roadway. See plate 5232 for details. nppp OF TYPICAL ill l��l��+� RESIDENTIAL �I ,�bw�itl STREET SECTION REVISED: 4-14 PLATE NO.: ENGINEERING DEPARTMENT 5200 FILE NAME :G:\ENG\SPECS\5200 10' OVER FROM PA NO CURB & GUTTER 6 3 a 50' MAX DRIVEWAY 'WIDTH INSIDE PROPERTY IF HARDCOVER ALLOWS * S m 24' MAX WIDTH AT R.O.W. R.O.W. R R.O.W. - IF A RADIUS IS INSTALLED, A MIN. OF 3' RADIUS 15 OUIRIED. 3' 3' 3' EDGE OF EX. PAVEMENT / SAWCUT LINE END OF DRIVE SAWCUT ALL STREET PATCH AREAS AND K BEFORE PAVING. NOTE, ®ON BITUMINOUS STREETS CONTRACTOR MUST SAWCUT AND REPLACE MIN 18" STRIP OF STREET SECTION WITH WEAR PAVEMENT TO MATCH EXISTING STREET SECTION THICKNESS. aDRIVEWAY THICKNESS TO THE RIGHT OF WAY SHALL BE A MINIMUM OF 2-2" LIFTS OF BITUMINOUS WITH 6" OF CLASS 5 FOR BASE CURB & GUTTER OVER FROM PA J10' \ 6 50' MAX DRIVEWAY WIDTH INSIDE PROPERTY IF HARDCOVER ALLOWS E is m iY 24' MAX WIDTH IN R.O.W. R.O.W. R IF A RADIUS IS INSTALLED, A MIN. OF 3' ACK OF CURB 2ADIU5 IS REQUIRED. 3' JR]l ' e .° n NOTE; DRIVEWAY THICKNESS IN R.O.W- SHALL BE A MINIMUM OF 2-2' LIFTS OF BITUMINOUS WITH 6" OF CLASS 5 FOR BASE IF THE CURB NEEDS TO BE REPLACED THEN THE ABOVE DETAIL FOR STREET REPLACEMENT SHALL BE USED AND THE CURB REMOVED TO THE NEAREST JOINT OR SAWCUT IF 5' OF CURB WILL REMAIN TO THE NEXT JOINT AND GUTTER LINE MAINTAINS PROPER DRAINAGE. affOF RESIDENTIAL BITUMINOUS DRIVEWAY ENTRANCES WITH AND WITHOUT CURBS REVISED: 2-10 ENGINEERING DEPARTMENT PLATE NO.: 5209 FILE NAME:G:\ENG\SPECS\5209 6" 1 Distance to `t variable /2 r 3"r 1 /2 Top Bituminous r Material sl 4op 3/e j r']D e < N 8 " MnDOT B618 Concrete Curb and Gutter - Distance to variable 1 /2"r „ 1 /2"r To uminous Material �3 Slope N \ in 314 per MnDOT B612 • Concrete Curb and Gutter r7 µ ° � N . 12" NOTE: oar Use Only with ate Driveways, Parking Lots, or Media s. 28"R 12"R 18' Top Bituminous Material 68"R 17 1/2" 10 1/2" 1 Surmountable Concrete Curb and Gutter 28" 1 QTIOF TYPICAL CURB ffiffim AND GUTTER REVISED: 3-10 ENGINEERING DEPARTMENT PLATE NO.: 5203 FILE NAME:G:\ENG\SPECS\5203 CURB w Z J r VARIABLE w 0 Of a_ I 1' HYDRANT VALVE BOX VARIES 5'-6' (SEE PLANS) ` 1/4" PER FT. SLOPE TO ROADWAY nd 4" CLASS 5 BASE 2' 3' 2.5' Min. CONCRETE SEE NOTES 1 & 3 NOTES: 1. TYPICAL 6" THICK CONCRETE SIDEWALK. 2. USE 8" THICK FOR COMMERICAL DRIVEWAY CROSSING. 3. JOINT SPACING AT 5' INTERVALS. EXPANSION JOINT SPACING AT 100' INTERVALS AND WHEN ABUTTING EXISTING CONCRETE OR STRUCTURE, Cfff Uip i CONCRETE SIDEWALK REVISED: 1-10 SPECS 5214 PLATE NO.: ENGINEERING DEPARTMENT 5214 FILE NAME: G: ENG B618 CURE & GUTTER TYPICAL RESIDENTIAL RADIUS - 20' TYPICAL COLLECTOR RADIUS - 30' 6" height 2"drop 10' Tong transitional height curbing' 4" height 7„ 7„ f MNDOT B618 CONC. C & G SURMOUNTABLE C & G SECTION A -A aff or TYPICAL CURB MIM RADIUS REVISED: 1-10 PLATE NO.: FILE NAME:G:\ENG\SPECS\5204 ENGINEERING DEPARTMENT 5204 NOTCH CLAY SUB -GRADE FOR PIPE PLACEMENT °-10" a . p' p' a p- AGGREGATE BASE W � MNDOT SELECT GRANULAR BORROW of o pi COURSE FILTER AGGREGATE :2 MNDOT 3149.2H 0 O zo 12" DEEP w N Off= D N V GRADE TO DRAIN CLAY SUB -GRAD 4" PERFORATED PIPE GEOTEXTILE WRAP (3733, TYPE 1) TRENCH DETAIL PVC PIPE DETAIL NOTES: 1. CLEANOUTS REQUIRED AT 300' INTERVALS & ALL ENDING POINTS. 2. SWING TIES TO BE SHOWN ON AS-BUILTS FOR ALL ENDING POINTS TO ALL DRAINTILES. 3. OPENINGS IN STRUCTURE FOR DRAINTILE TO BE FABRICATED OR CORE DRILLED. 4. THIS DETAIL TO BE USED WHEN 2' OR MORE OF EXISTING SOIL SUB CUT IS NECESSARY. 6" CONC. OLLAR GROUT AROUND PIPE i. UM OF 4" SUB -SURFACE MIME DRAINTILE REVISED:3-14 PLATE NO.: FILE NAME: G:\ENG\SPECS\5232 ENGINEERING DEPARTMENT 5232 HIGH/LOW PT. FOR DRAINAGE CIRCUM 45.5' RADIUS=285.88'/360' 60.25' \ I \ \��• I U7 �s �`f3 Iui \\ I STANDARD CUL-DE-SAC X I Y* COM./IND. 60 RAD. 48'. RAD. URBAN 60' RAD. 45.5' RAD. RURAL 60' RAD. 40'. RAD.* *NOTE: 1. ALL DISTANCE FOR STREET WIDTHS ARE MEASURED TO BACK OF CURB. 2. PLUS 6' GRAVEL SHOULDER. (RURAL) {f[OF TYPICAL CUL-DE-SAC REVISED: 1-10 ENGINEERING DEPARTMENT PLATE NO.: 5205 FILE NAME: G: \ENG\SPECS\5205 FINISHED GRADE ONE PIECE PVC SDR.-35 CLEANOUT RISER (SIZE AS PER PLAN) HUB WITH THREADED METAL PLUG TO BE SET AT FINAL GRADE, METAL TOP PLUG MADE OF MATERIAL TO ALLOW LOCATES VIA METAL DETECTOR. 10' MIN. NOTE: 1. SOLVANT WELD ALL JOINTS ON CLEAN OUT. (NON-GASKETED) 2. CLEAN OUTS SHALL BE SPACED AT 300' INTERVALS (MAXIMUM) 3. BENDS AND RISER TO BE SAME SIZE AS DRAINTILE MAIN. 4. ALL DRAINTILE MUST HAVE TRACER WIRE TAPED TO THE TOP OF THE PIPE AND BE BROUGHT UP TO THE SURFACE AT EACH STRUCTURE OR CLEAN OUT. TRACER WIRE AS PER SPECIFICATIONS. FOLLOWING COMPLETION, THE CONTRACTOR WILL BE REQUIRED TO PASS A LOW VOLTAGE CODUCTIVITY TEST. 1mfOF SUB -SURFACE PVC DRAINTILE 1,111��yQ� CLEANOUTS FOR INLINE AND C�11�e�l�l�i11 END OF RUN CLEANOUTS REVISED: 1-12 ENGINEERING DEPARTMENT PLATE NO.: FILE NAME: G:\ENG\SPECq\5234 I 5 2 3 4 Oz� w 0 w a',nZ Owz ZWw O Za UVOO OZ w M Z U 0 If a Z W- 0 gx � w CZQ a < Q 0 W }oo W 0 m Q V1 0 u 0 3 U a w < w Way z z � w'Np W ¢ W z z & 0 Q� a V5 0 II NO REVISION DATE 1 4/l/2016 CITY SUBMITTAL SURVEY DRAWN CITY DESIGNED CHECKED RLH APPROVED RLH PROD. NO. 193503412 SHEET NUMBER C9.03 Z O w - � U 0 aim N � d w O�dw Zw0 o0z0m Z31a,0 oy,o� w=zw O�d< 0 0 ' a0w> 0�0 �'. Ow� m�ao Z. Z� OJ3a R'yR•F wm Z C ZDQ 0Ozi a=sir �Zw EocD= w00U J O 0 N ioa° w 0 n Z <QF'a Zia- w UQU� =0= 0 5 FT. MIN. LENGTH STEEL POST AT 6 FT. MAX. SPACING GEATEXTILE FABRIC PLASTIC ZIP TIES �36 WIDE (50 LB. TENSILE) LOCATED IN TOP 8" TIRE COMPACTION ZONE Z FLOW FLAW z ~ ZW �6 m oW MACHINE SLICE NU) 8' - 12" DEPTH O SILT FENCE. MACHINE SLICED 1 2 5 FT. MIN. LENGTH STEEL POST AT 6 FT. MAX. SPACING PLASnc 21P TIES (50 LB. TENSILE) LOCATED IN TOP A8" N NZ Ow WWI �m INN GEOTEXTILE FABRIC I 36" WIDE 6"MIN. SILT FENCE, HEAVY DUTY 1 2 5 FT. MIN. LENGTH STEEL POST GEOTEXTILE FABRIC AT 6 FT. MAX. SPACING 36" WIDE STAPLES FABRIC ANCHORAGE TRENCH. BACKFILL F- WITH TAMPED NATURAL SOIL v7 � Z FLOW aw ? o ID Z SILT FENCE TO BE PLACED Cn 6' CONTOUR. SEE SLOPE/GRADE INV�AAND LENGTH CRITERIA BELOW GO W SILT FENCE, PREASSEMBLED 1 2 t 1 vAR1�ESLOPE SLOPE GRADE MAX LENGTH LESS THAN 2% 100 FEET 2 - 5. % 75 FEET 5 -10% 50 FEET NOTES: 10 - 20 % 25 FEET SILT FENCE PER MNDOT SPECS, SOURCE 2005 GREATER THAN 20% 15 FEET SEE SPECS. 2573 & 3886. LOCATION OF SILT FENCE 0 To Protect Area From Street Flow FOR SEDIMENT CONTROL l'l MOXIMUrn Contributing Area: 1 Acre VARIABLE SLOPE DESIRABLE SILT FENCE NEAR TOE OF 1' SLOPE OUTSIDE OF CONSTRUCTION LIMITS LOCATION OF SILT FENCE FOR PEREMITER CONTROL OF SILT Comm FENCE REVISED: 3-12 ENGINEERING DEPARTMENT PLATE NO.: 5300 FILE NAME: G: \ENG\SPECS\5300 BIOROLL WATTLE/ROCK WEIR TO BE REMOVED WHEN STABILIZED. WATTLE BIOROLL WEIR TRASH GUARD B\OF FES 6" OR 12" BIOROLL SECURED INSIDE FES 1"-2" CLEAN CRUSHED ROCK 6"MIN.DEPTH FOR ROCK~OQ\ 10"MIN.DEPTH FOR WOODCHIPS 00, Qp 18" MINIMUM CUT OFF BERM TO MINIMIZE RUNOFF FROM SITE FILTER FABRIC NOTE: FILTER FABRIC SHALL BE PLACED UNDER ROCK TO STOP MUD MIGRATION THROUGH ROCK. �OF ROCK r CONSTRUCTION mmm ENTRANCE REVISED: 1-10 ENGINEERING DEPARTMENT PLATE NO.: 5301 FILE NAME: G: \ENG\SPECS 5301 15 N N tI �- QSilo O 1 m ROCK & FABRIC WEIR PERIMETER CONTROL BOTTOM \ OF FES 6"-12" OF 1h" TO 2" — WASHED ROCK WRAPPED INSIDE A MONOFILAMENT TYPE GEOTEXTILE FABRIC INSIDE FES FLOW 1�111OF FLARED END SEDIMENT TRAP ROCK WEIR/WATTLE ROLL REVISED: 3-14 ENGINEERING DEPARTMENT PLATE No.: FILE NAME:G:\ENG\SPECS\5302A 5 3 0 2 E I N B ! - - I - s 6 w m � w s Z - _ - i u d- 1 - $ r rc S �`P w 6x z ' xeR3 � I >g �'g Its �a N R dW E6e m ce'3 �. �igx 6 ffiZ <b a6 a� B i W �3 2 4S.R $YAbY Nfl-KH P i w,p0r SiANBNip iIAN SNG4I A{,. 5-29T254 (2 Uf S� SiAHDAR6 A 0,12 R MAY 10, 20i2 C1T�OF Pedestrain Curb Ramps Page 2 of 5 REVISED: 3-14 PLATE NO ENGINEERING DEPARTMENT 5215A FILE NAME: G:\ENG\SPECS\5215A 1" DIAMETER ROCK FILTER NOTE: SILT FENCE PER MNDOT SPECIFICATIONS, SOURCE MACHINE SLICED WOVEN MONOFILAMENT, 36" WiDI FASTENED TO STEEL T-I WITH 3 (501-B) TENSILE STRENGTH PLASTIC ZIP TIES PER T-POST.(MACHINE SLICED) RUNOFF 4' MINIMUM FILTERED WATER SECTION A L W1 T-1 12" Crff OF OFFROAD CATCHBASIN CHIMM FILTER BARRIER REVISED: 2-10 PLATE NO.: ENGINEERING DEPARTMENT 5302 FILE NAME: G:\ENG\SPECS\5302 GENERAL NOTES - TYPE R LUMINAIRE: O/ LUMINAIRE SHALL BE RAVEN SERIES LIGHT FIXTURE (RCS-AIO-S25-H3-F-Q-DB-F3) MANUFACTURED BY SPAULDING LIGHTING OR APPROVED EQUAL. FIXTURE REQUIREMENTS ARE: 10' RIGID ARM MOUNT HIGH PRESSURE SWUM 250 WATTS TYPE III HORIZONTAL DISTRIBUTION FLAT LENS * _ 240 VOLTS 240 VOLT FUSING O2 ARM SHALL BE RECTANGULAR EXTRUDED ALUMINUM TUBE (2.253 x 6"3 x 10"t LONG). O UGHTING STANDARD SHALL BE CORTEN SELF -WEATHERING SQUARE TAPPERED STEEL. MILLERBERNO FUTURA SERIES SOH -SW OR APPROVED EQUAL. 10'f 1� 4O REMOVABLE WEATHERPROOF TOP COVERPLAT£. \I 0 LIGHTING STANDARD BASE SHALL BE TYPE-H CASE STEEL. © ACCESS DOOR SHALL BE REMOVABLE WEATHERPROOF 6- X 7 1/4" X 9" HIGH. 2 1 O7 PROVIDE INTERNAL GROUND LUC. 3 FEEDER LEADS TO THE LUMINAIRE SHALL EXTEND FROM THE PROPER CABLES IN THE BASE OF THE STANDARD THROUGH SEPARATE 5 AMPERE IN -THE -LINE FUSES. SUITABLE SOLDERLESS CONNECTORS SHALL BE USED. FUSES SHALL BE EQUAL TO SUSSMAN IN -THE -LINE WATERPROOF FUSEHOLDER THPE HEB WITH A SUSSMAN TYPE FNM DUAL ELEMENT FUSE. GENERAL NOTES: UGHTING ASSEMBLY SHALL CONTAIN ALL MODIFICATIONS NECESSARY TO COMPLY WITH N.S.P. GROUP III MAINTENANCE PROGRAM. THE CONTRACTOR SHALL PROVIDE AND TURN OVER TO THE CITY, (2) SPARE LUMINAIRES AND BALLAST ASSEMBLIES COMPLETE 'NTH ALL COMPONENTS AND MODIFICATIONS AS REQUIRED. THE EXACT LOCATION OF ALL STREET UGHT ASSEMBLIES SHALL BE STAKED BY THE ENGINEER x a LUMINAIRES BEING PROVIDED ON THIS PROJECT SMALL INSPECTED AND APPROVED FOR „o, S INSTALLATION PRIOR TO INSTALLATION FOR THE N.S.P. M MAINTENANCE PROGRAM. w COORDINATE THIS PROCEDURE PATH THE AUTHORIZED N.S.P- REPRESENTATIVE. li b w ALL EXPOSED METAL COMPONENTS SHALL BE FACTORY FINISHED BAKED ALKYD ENAMEL (" TO MATCH CORTEN 4-YEAR WEATHERING STEEL. AS PER Mn/DOT SPEC. COMPLETE ASSEMBLY SHALL BE STRUCTURALLY DESIGNED FOR 100 MPH WIND LOAD FOR E.P.A. IMPOSED. ALL LIGHT WIRES (INCLUDING RUNS BETWEEN LIGHT POLES AND STREET CROSSINGS) SHALL BE PLACED IN CONDUIT. SPUCE BOXES OR HANDHOLES SHALL BE INSTALLED AT ALL STREET CROSSINGS THAT SERVE AN OPPOSITE SIDE UGHT POLE. PROVIDE BREAKAWAY FUSE HOLDERS LOCATED AT DOOR OPENING FUSE: (TROM 30A - 60OV-YO66) 4'-'0" I N CURB TrOF LIGHTING POLE REVISED:2-08 PLATE NO.: ENGINEERING DEPARTMENT 5240 FILE NAME: G: \ENG\SPECS\5240 SEDIMENT TRAP MANUFACTURED BY WIMCO,LLC.SHAKOPEE, MN., ESS BROS., CORCORAN, MN. OR EQUAL SPEGFICATIONS AND STANDARDS DESIGN LOADS AISC MANUAL OF STEEL CONSTRUCTION, 9TH EDITION. ALLOWABLE AXLE WEIGHT LOAD N/A AWS STRUCTURAL WELDING COD - STFFI D1.1-94, SAFETY FACTOR N/A 29 CFR 1926 - OSHA S1 = AND HEALTH STANDARDS WATER FLOW RATE (THROUGH TYPE FF FILTER) 0.707 CFS O 3' HEAD MAXIMUM OVERFLOW RATE 5.94 CPS O 15• HEAD MODEL#CG23 DEFLECTOR PLATE OVERFLOW 1 - CENTER OF FILTER ASSEMBLIY OVERFLOW 2 - TOP OF CURB BOX l 10" ALTER ASSEMBLY CURB CG-2J HIGH -FLOW HIGH -FLOW FABRIC - NOTES: 1. CLEAN FILTER MEDIA AFTER EACH RAIN EVENT AND REPLACE IF FILTER IS CLOGGED WITH SEDIMENT. 2. REMOVE DEBRIS/SEDIMENT FROM RECEPTACLE AFTER EACH RAIN EVENT. M10F CATCH BASIN SEDIMENT TRAP * SIMM REVISED: 1-10 ENGINEERING DEPARTMENT PLATE NO.: FILE NAME:G: ENG\SPECS 5302A 5 3 0 2 A V 4J r h E 'D o ch irT U 0 U Z N 3: � C a ,n 0 M a 04 N 3 Oza wow OWz ww a 0,�<'4 ¢U 1-RR O z U W(� �W,W'zZ S 0 U w O LL z z Q = a, LD z LLo<3 � <:5 .. WU W < _ w �E w r w M04M < z Q w N fD O <zz Z Z 0 =3<n a < n J Z a L u E- N w U) 0 Q o 2 < Z o z 2 � U z Uj Q V) 0 LL Q U 0 J L LJ � U Q INOIREVISION DATE 1 4/1/2016 CITY SUBMITTAL SURVEY DRAWN CITY DESIGNED CHECKED RLH APPROVED RLH PROJ. NO. 193803412 SHEET NUMBER C9.04 z w OF r U � W J Aga° S °Zm tad' Z3H0 V; U i);Z J 0 Oy N OWaoam .mow L. N zz m7S O <3a LL'yOCF mzoQ zQ<F LLOzw WOgx MV >00w o� y0a. rcw�d o>=r UZO< a W z z ,,, 030j wda,wa, sos0 LL z X N M P i =gam_ ' 1I I i ' 1I ' I ! I 1 I r � I I ❑ 1❑ / I \ ' • I I / i' / •I i 1 OUTLOT 1 CO p \\ o o-WETLAND i �Y I I V �� (MANAGE 2) \ \ 1 I I. 8 1p1 i 101 1 y \ ? — 1 -Tole --_—_� \ ,�• � � I'> F _'/ ��)Jili I) j Q I L;I r �-,Q,$ OUTLOT 2 ; yl IF- / ) i I I i1 6 Imo— WETLAND FL1 1 ate( i \ �. (MANAGE 1) ! ! I �� � <��p � may► �r e. r it • FO it �i 4p , �, , 1�1IJ Tv �tl ,•ems.- �i-<�<• rf+ ';-� _ - �"' �" {'�•r_ /�►� �IYI�.allls3l �j' � �i 1��►°i'�/1",•��. 1 �> }i•%� �....-$�6:�,.`: % �.' .. >-e - ir;�� Y � � ��1i��11:; :_O� (!:��.^_���: .'� � r2 \ �' °sLr o,.♦ i�-��/d 1�•�����•n•� �..,•, ���y'•- ,G.J- ""c liw. j�� S-1-{DtF:���1T-!�:.. �.����®•i �.*.:�'Ct�, ..♦ i :.. �44i ��� b� Y �rK�Goa,.: ° a ��'� r. �•:v � �/A �� • '.. t•�• "� 11 • rC - (� . /q1,S,�• j R � 1 7..aiw i•_ ��� �. S .. ♦.�.� �- > 2•; e.• o .�♦ ♦0�.= _� =�^• Ii YiY �/� f�.. P'4 '•r .• .�- 7� v..i .{!. �. .on r �:•��:-w�iiG �' 1lfl! �► >•./•n P. •.� 11 jtyil -• `, �qj►. >�{�/•�� . i7itD •-� T. �i�i ���i ���:-�• �1�i'-A-O� �-�y 4d !•��1Q--��•/�_ T 1,. "1WIN • W PLANTING OUANTITIES SUMMARY CONFORMANCE TO CANOPY REPLACEMENT & 15' BUFFERYARD REQUIREMENTS BUFFERYARD PLANTING: PER SEC. 20-1176. TABLE , PAGE 2. BUFFERYARD PLANTING BETWEEN MEDIUM AND ROAD = BUFFERYARD B/100 LF 2 CANOPY TREES, 4 UNDERSTORY TREES, 6 SHRUBS CANOPY REPLACEMENT & BUFFERYARD REQUIRED DECIDUOUS & CONIFEROUS OVERSTORY DECIDUOUS & CONIFEROUS UNDERSTORI & ORNAMENTAL TREES DECIDUOUS & CONIFEROUS SHRUBS CANOPY REPLACEMENT & BUFFERYARD PROVIDED V 4J C M ,0 M E O T in U U tz c = J H In 0 � a N N Oz� 10 lW OWw Oh Zla PLANT LEGEND <UR2 6 Ww z U QUANTITIES QUANTITIES W r o f J DECIDUOUS OVERSTORY TREES - 2.5" CAL. BB: 50 ORNAMENTAL TREES - 1.5" CAL., BB: 22 a o o Z AUTUMN BLAZE MAPLE AMUR MAPLE = � U vi a- 0 0 Acer x freemanii Acer ginnala ? 5 a��LL U OAK - ALL VARIETIES SERVICEBERRY OR JUNEBERRY m <O f Quercus spp. Amelanchier spp. 0 3 �o ag OHIO BUCKEYE CRABAPPLE, ASSORTED FLOWERING VARIETIES U a Aesculus glabra Malus spp. m t = z RIVER BIRCH ASPEN w z z & a Betula papyrifera Populus tremuloides 3 a d o PAPER BIRCH MOUNTAIN ASH - ALL VARIETIES Betula papyrifera Sorbus spp. GINGKO AMUR CORKTREE Ginkgo biloba Phellodendron amurense HONEYLOCUST- ALL VARIETIES NEWPORT PLUM Gleditsia triacanthos inermis, spp. Prunus cerasifera "Newport' LINDEN - ALL VARIETIES FLOWERING PLUM OR ROSE TREE OF CHINA Tilia spp. Prunus triloba ELM - DIED RESITANT VARIETIES JAPANESE TREE LILAC Ulmus spp. Syringa reticulata CONIFEROUS OVERSTORY TREES - 6-8' HT, BB: 16 DECIDUOUS AND CONIFEROUS SHRUBS: 41 C x BALSAM FIR LARGE: Abies balsamea CONCOLOR FIR COMMON LILAC J LLJ Lilac spp. Abies concolor N N TAMARACK HONEYSUCKLE ' ^ Q Larix laricina Lonicera v RED TWIG DOGWOOD 7 = NORWAY SPRUCE Z Z Z Comus sericea Q Picea abies 0 WHITE SPRUCE YELLOW TWIG DOGWOOD = 11 Comussericea'Flaviramea' J � Picea glauca 0 (� VIBURNUM z BLACK HILLS SPRUCE '-' Picea glauca densata COTONEASTER = z Cotoneaster pannosa Uj Q Pinus n g a PINE WINGED EUONYMUS 0 a PONDEROSA PINE Euonymus alatus W Pinus ponderosa BARBERRY i Berberis vulgaris Uj U NORWAY PINE ZD Pinus resinosa MEDIUM: v% I WHITE PINE ALPINE CURRANT O LLJ Pinus strobus Ribes alpinum �L SCOTCH PINE GOLDEN MOCK ORANGE Q Pinus sylvestris Philadelphus coronarius DOUGLAS FIR SNOWMOUND SPIREA Pseudotsuga menziesii Spirea nipponica ARBORVITAE Thuja occidentalis SOD PERENNIAL BED w/ MULCH/ROCK PERRENIALS GRASSES DAYLILLY Feather Reed Grass Hemorocallis spp. Switch Grass Miscanthus (Plume Grass) SEED MULCH ALL DISTURBED AREAS IS NOT SODDED OR IN MULCH BEDS WET MEADOW SEED MIX FOR EMERGENT MARSH CONDITIONS — — — — BUFFERYARD SETBACK NO REVISION DATE 1 4/1/2016 CITY SUBMITTAL SURVEY N DRAWN S1S DESIGNED MRP CHECKED MRP APPROVED MRP PROJ. NO. 193803412 4'� 8� SHEET NUMBER L1.01 z O F x U 0 Nr0 5w w w z�wo soZm ~ � O z3 aF0'=' uz,z�w Fw� �waF m 0 w� W a . E m'<0 Z m U o ?¢ wa3 ww y tt 2 oz w oozz z< <=n, ti Nazi Noolo 0w �Oow <0<O w�OQ w i a< 7� '0O z w o3:u .<.� 0�0 h DO NOT HEAVILY PRUNE THE TREE AT PLANTING. PRUNE ONLY CROSSOVER LIMBS, CO -DOMINANT LEADERS AND BROKEN OR DEAD BRANCHES, SOME INTERIOR TWIGS AND LATERAL BRANCHES MAY BE PRUNED; HOWEVER DO NOT REMOVE THE TERMINAL BUDS OF BRANCHES THAT EXTEND TO THE EDGE OF THE CROWN. STAKE TREES ONLY AS SPECIFIED AT THE DIRECTION OF LANDSCAPE ARCHITECT WRAP TREE TRUNKS AS SPECIFIED. MARK THE NORTH SIDE OF THE TREE IN THE NURSERY, AND ROTATE TREE TO FACE NORTH IN THE FIELD. SET TOP OF ROOT BALL FLUSH TO GRADE OR 1-2 IN. HIGHER IN SLOWLY DRAINING SOILS. CONTRACTOR IS RESPONSIBLE FOR TESTING PERCOLATION RATES PRIOR TO PLANTING. NOTIFY LANDSCAPE ARCHITECT OF ANY POTENTIAL DRAINAGE ISSUES PRIOR TO FINAL PLANTING. INSTALL APPROVED DRAINAGE MATERIALS AS DIRECTED. ADD MYCORRIZAL TRANSPLANT INOCULANT AT PLANTING TIME PER MANUFACTURER'S DIRECTIONS. IF PLANT IS SHIPPED WITH A CONTAINER AROUND THE ROOTBALL, SLICE SIDES OF CONTAINER AND REMOVE COMPLETELY. USE FINGERS OR SMALL HAND TOOLS TO PULL ROOTS OUT OF THE OUTER LAYER OF POTTING SOIL, THEN CUT OR PULL APART ANY CIRCLING ROOTS. TO IMPROVE TRANSPLANTING SUCCESS THE FOLLOWING VARIETIES SHOULD BE SPRING PLANTED ONLY: PINE, OAK, MAPLE, HONEYLOCUST AND CRABAPPLE. PRUNE BRANCHES TO A MINIMUM OF 8' TO ALLOW FOR A CLEAR SIGHT DISTANCE.. PROVIDE GRAVEL FILLED DRY WELL FOR POORLY DRAINED SOILS AS DIRECTED BY THE LANDSCAPE ARCHITECT. BALLED AND BURLAPPED TREE NO SCALE —III—\ \ -III-III- \ IIIIIIIIII / NOTE: CONTRACTOR SHALL FABRICATE AND INSTALL HARDWARE CLOTH DEER PROTECTION WRAPS AROUND ALL DECIDUOUS TREES. 6-8" DIAMETER, Y2" MESH, T HT. OR TO LOWEST BRANCH. DEER PROTECTION SHALL BE INCIDENTAL TO THE TREE IT PROTECTS. SEE PLANTING DETAILS FOR INSTALLATION REQUIREMENTS. TAMP SOIL AROUND ROOT BALL BASE AND WATERING RING FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT. MAINTAIN UNDISTRUBED SUBGRADE UNDER ROOTBALL. EXTEND EXCAVATION AND BACKFILL SOIL TO A POINT DOWNSLOPE EQUAL TO OR LOWER IN ELEVATIONS THAN BOTTOM OF PLANTTING HOLE \ TO ENSURE ADEQUATE DRAINAGE IN HEAVY ///� SOILS. GRANULAR SOIL MUST BE ADDED AS A BACKFILL IN AREAS OF POOR DRAINAGE. BALLED AND BURLAPPED TREE PLANTING ON SLOPE NO SCALE PLANTING NOTES 1. CONTRACTOR SHALL LOCATE AND VERIFY LOCATIONS OF ALL UTILITIES WITHIN AND NEAR PLANTING AREAS (SEE ELECTRICAL DRAWINGS). CONTRACTOR SHALL DIG OUT PLANTINGS IN AREAS WITH UTILITIES. 2. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE TO NOTIFY LANDSCAPE ARCHITECT WHEN CONDITIONS DETRIMENTAL TO PLANT GROWTH ARE ENCOUNTERED, SUCH AS RUBBLE FILL, ADVERSE DRAINAGE CONDITIONS OR OBSTRUCTIONS. 3. LANDSCAPE ARCHITECT TO APPROVE ALL TREE PLANTING/STAKING LOCATIONS PRIOR TO WORK COMMENCING. 4. PLANT TREES AND SHRUBS AFTER FINAL GRADES ARE ESTABLISHED AND PRIOR TO PLANTING OF LAWNS, UNLESS OTHERWISE ACCEPTABLE TO LANDSCAPE ARCHITECT. PROVIDE PLANTING SOIL AND AMENDMENTS AT TREE PLANTINGS LOCATED AWAY FROM SHRUB BEDS. 5. DO NOT MAKE SUBSTITUTIONS. IF SPECIFIED LANDSCAPE MATERIAL IS NOT OBTAINABLE, NOTIFY LANDSCAPE ARCHITECT, ALONG WITH A PROPOSAL FOR USE OF EQUIVALENT MATERIAL. 6. IF THERE IS A DISCREPANCY BETWEEN THE NUMBER OF PLANTS SHOWN ON THE PLAN AND THE NUMBER SHOWN ON THE PLANT LIST, THE NUMBER SHOWN ON THE PLAN SHALL GOVERN. 7. MULCH ALL PLANTING AREAS WITH CLEAN, DOUBLE SHREDDED HARDWOOD MULCH UNLESS OTHERWISE NOTED. MULCH MATERIAL TO BE MINIMUM 4" DEPTH (TYP.), NO BARK, STICKS OR TWIGS. 8. LANDSCAPE CONTRACTOR HAS OPTION OF GUARANTEEING PLUMB TREES THROUGH INSTALLATION AND 2 YEAR MAINTENANCE PERIOD IN LIEU OF STAKING AND GUYING. 9. WARRANTY PLANTS FOR 2 GROWING SEASONS - 2 YEAR WARRANTY. SET TREE PLUMB AND MAINTAIN THROUGHOUT WARRANTY PERIOD REMOVE ALL FLAGGING AND LABELS. EACH TREE MUST BE PLANTED SUCH THAT THE ROOT FLARE IS VISIBLE AT THE TOP OF THE ROOT BALL. TREES WHERE THE ROOT FLARE IS NOT VISIBLE SHALL BE REJECTED. DO NOT COVER THE TOP OF THE ROOT BALL WITH SOIL. ROOT BALLS DELIVERED WITH THE ROOT FLARE MORE THAN 4" BELOW THE TOP OF THE BALL WILL BE REJECTED. 3" MULCH AS SPECIFIED, DO NOT PLACE MULCH IN CONTACT WITH TREE TRUNK, MAINTAIN THE MULCH WEED -FREE FOR THE DURATION OF THE WARRANTY PERIOD. PLACE MULCH WITHIN 48 HOURS OF SECOND WATERING. MULCH SHALL BE INCIDENTAL TO PROJECT. DIG HOLE 3x ROOT BALL DIA. OR AS SPECIFIED FOR SOIL CONDITION ENCOUNTERED WITH TAPERED SIDES. SCARIFY THE SIDES AND BOTTOM OF THE HOLE BEFORE PLACING THE TREE IN THE PLANTING HOLE. BACKFILL 2/3 WITH MODIFIED PLANTING SOIL AS SPECIFIED FOR THE SPECIFIC SOIL CONDITION ENCOUNTERED AND WATER THOROUGHLY WITHIN 2 HOURS. BACKFILL REMAINING 1/3 WITHIN 48 HOURS AND CONSTRUCT 4" HIGH EARTH SAUCER BEYOND EDGE OF ROOT BALL AND WATER THOROUGHLY. REMOVE ALL TWINE, ROPE AND WIREBASKET AND BURLAP FROM TOP 1/3 OF ROOT BALL OR TO 2ND RING OF WIRE BASKET, WHICHEVER IS GREATER. REMOVE ALL PLASTIC WRAP OR ROPE FROM ENTIRE BALL. PLACE ROOT BALL ON FIRM UNEXCAVATED OR TAMPED SOIL. TAMP SOIL AROUND BASE OF ROOT BALL FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT. SPACE TREES ACCORDING TO PLANS. IF PLANT IS SHIPPED WITH A CONTAINER AROUND THE ROOTBALL, SLICE SIDES OF CONTAINER AND REMOVE COMPLETELY. USE FINGERS OR SMALL HAND TOOLS TO PULL ROOTS OUT OF THE OUTER LAYER OF POTTING SOIL, THEN CUT OR PULL APART ANY CIRCLING ROOTS. REMOVE ALL ROPE, TWINE AND BURLAP FROM TOP HALF OF ROOT BALL FROM B&B SHRUBS. DO NOT HEAVILY PRUNE AT PLANTING. PRUNE ONLY BROKEN OR DEAD BRANCHES, RETAINING NATURAL FORM. DURING THE SPRING PLANTING SEASON, ANY EVERGREEN SHRUB DELIVERED WITH NEW GROWTH IN ADVANCE STAGE OF CANDLING OUT WILL BE REJECTED. SET TOP OF ROOT BALL FLUSH TO GRADE OR 1-2 IN. HIGHER IN SLOWLY DRAINING SOILS. ADD MYCORRHIZAL TRANSPLANT INOCULANT AT PLANTING TIME PER MANUFACTURER'S DIRECTIONS. DURING THE SPRING PLANTING SEASON, ANY SET TREE PLUMB AND MAINTAIN THROUGHOUT WARRANTY PERIOD. EVERGREEN PLANT DELIVERED WITH NEW GROWTH IN ADVANCE STAGE OF CANDLING OUT WILL BE EACH TREE MUST BE PLANTED SUCH THAT THE ROOT FLARE IS REJECTED. EVERGREEN TREES NOT FULLY VISIBLE AT THE TOP OF THE ROOT BALL. TREES WHERE THE ROOT BRANCHED FROM BOTTOM TO TOP WILL BE p FLARE IS NOT VISIBLE SHALL BE REJECTED. DO NOT COVER THE REJECTED AND THOSE WITH TERMINAL LEADERS TOP OF THE ROOT BALL WITH SOIL. ROOT BALLS DELIVERED WITH EXCEEDING 300 MM (12") IN LENGTH WILL ALSO BE �Q THE ROOT FLARE MORE THAN 4" BELOW THE TOP OF THE BALL WILL REJECTED BE REJECTED. STAKE TREES ONLY AS SPECIFIED AT THE 3" MULCH AS SPECIFIED, DO NOT PLACE MULCH IN CONTACT WITH DIRECTION OF LANDSCAPE ARCHITECT TREE TRUNK, MAINTAIN THE MULCH WEED -FREE FOR THE DURATION d? (3 OF THE WARRANTY PERIOD. PLACE MULCH WITHIN 48 HOURS OF MARK THE NORTH SIDE OF THE TREE IN THE SECOND WATERING. NURSERY, AND ROTATE 419 g TREE TO FACE NORTH IN THE FIELD DIG HOLE 2x ROOT BALL DIA. SCARIFY THE SIDES AND BOTTOM OF THE HOLE BEFORE PLACING THE TREE IN THE PLANTING HOLE. SET TOP OF ROOT BALL FLUSH TO GRADE OR 1-2 IN. BACKFILL WITH MODIFIED PLANTING SOIL AS SPECIFIED AND HIGHER IN SLOWLY DRAINING SOILS. CONSTRUCT 4" HIGH EARTH SAUCER BEYOND EDGE OF ROOT BALL. WATER THOROUGHLY WITHIN 2 HOURS. MYCORRHIZAL TRANSPLANT INOCULANT TO BE ADDED AT PLANTING TIME PER MANUFACTURER'S REMOVE ALL TWINE, ROPE AND WIREBASKET AND BURLAP FROM TOP 1/3 DIRECTIONS. i OF ROOT BALL OR TO 2ND RING OF WIRE BASKET, WHICHEVER IS GREATER. REMOVE ALL PLASTIC WRAP OR ROPE FROM ENTIRE BALL. TYPICAL EVERGREEN TREE PLANTING NO SCALE CONTAINER GROWN PLANT AND BED PREPARATION NO SCALE 10. LANDSCAPE CONTRACTOR SHALL KEEP PAVEMENTS CLEAN AND WORK AREA IN AN ORDERLY CONDITION DURING PLANTING OPERATIONS. 11. SUBMIT PRODUCT DATA, COLOR SAMPLES, SCHEDULES, SEED MIXES AND CERTIFICATES FOR ALL PRODUCT\. 12. NURSERY STOCK SHALL MEET THE AMERICAN STANDARD FOR NURSERY STOCK,ANSI Z60.1. ALL PLANTS SHALL BE TRUE TO TYPE AND NAME IN ACCORDANCE WITH STANDARDIZED PLANT NAMES, MOST RECENT EDITION. 13. PROVIDE HEALTHY, VIGOROUS PLANTS FREE OF DISEASE, INSECTS, EGGS, LARVAE, AND FREE OF DEFECTS, ABRASIONS, OR DISFIGUREMENT. 14. DELIVER PACKAGE PRODUCTS IN ORIGINAL CONTAINERS AND PROTECT PRODUCTS FROM DETERIORATION DURING DELIVERY AND STORAGE ON SITE. 15. PROVIDE FRESH PLANTS AND INSTALL IMMEDIATELY. DO NOT PRUNE PRIOR TO DELIVERY. PROVIDE PROTECTIVE COVERING DURING DELIVERY. IF PLANTING IS DELAYED SET PLANTS IN SHADE, KEEP MOIST, AND PROTECT FROM WEATHER AND MECHANICAL DAMAGE. DO NOT REMOVE PLANTING STOCK FROM CONTAINERS UNTIL PLANTING TIME. 16, USE 100% DOUBLE SHREDDED HARDWOOD MULCH FOR ALL PLANTINGS. SPREAD MULCH TO 3" THICKNESS FOR TREES AND SHRUBS, 2" THICKNESS FOR PERENNIALS. 17. ALL TREES LOCATED IN TURF AREAS SHALL HAVE A 5' DIA. MULCH RING WITH METAL EDGE. METAL EDGING SHALL BE 1/4" STEEL OR ALUMINUM. 18. CONTRACTOR SHALL MAKE, AT THEIR OWN EXPENSE, WHATEVER ARRANGEMENTS NECESSARY TO ENSURE AN ADEQUATE SUPPLY OF WATER TO COMPLETE THE WORK AS SPECIFIED. FURNISH ALL NECESSARY HOSES, EQUIPMENT, ATTACHMENTS, AND ACCESSORIES FOR THE ADEQUATE 3" MULCH AS SPECIFIED. DO NOT PLACE MULCH IN CONTACT WITH THE PLANT. MAINTAIN THE MULCH WEED -FREE FOR THE DURATION OF THE WARRANTY PERIOD. PLACE MULCH WITHIN 48 HOURS OF SECOND WATERING. DIG HOLE 3x ROOT BALL DIA. SCARIFY THE SIDES AND BOTTOM OF THE HOLE BEFORE PLACING THE SHRUB IN THE PLANTING HOLE. BACKFILL WITH MODIFIED PLANTING SOIL AND ADD ANY SOIL AMENDMENTS OR FERTILIZERS AS SPECIFIED AND CONSTRUCT 3" HIGH EARTH SAUCER BEYOND EDGE OF ROOT BALL. WATER THOROUGHLY WITHIN 2 HOURS. PLACE ROOT BALL ON UNEXCAVATED OR TAMPED SOIL TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT. PROVIDE GRAVEL FILLED DRY WELL FOR POORLY DRAINED SOILS AS DIRECTED BY THE LANDSCAPE ARCHITECT. 2" MULCH AS SPECIFIED. DO NOT PLACE MULCH IN CONTACT WITH THE PLANT. MAINTAIN THE MULCH WEED -FREE FOR THE DURATION OF THE WARRENTY PERIOD. PLACE MULCH WITHIN 48 HOURS OF SECOND WATERING. DIG HOLE 2x ROOT BALL DIA. SCARIFY THE SIDES AND BOTTOM OF THE HOLE BEFORE PLACING THE PLANT IN THE PLANTING HOLE. BACKFILL WITH MODIFIED PLANTING SOIL AS SPECIFIED. WATER THOROUGHLY WITHIN 2 HOURS. IF PLANT IS SHIPPED WITH A CONTAINER AROUND THE ROOTBALL, SLICE SIDES OF CONTAINER AND REMOVE COMPLETELY. USE FINGERS OR SMALL HAND TOOLS TO PULL ROOTS OUT OF THE OUTER LAYER OF POTTING SOIL, THEN CUT OR PULL APART ANY CIRCLING ROOTS. SET TOP OF ROOT BALL FLUSH TO GRADE OR 1-2 IN, HIGHER IN SLOWLY DRAINING SOILS. ADD MYCORRHIZAL TRANSPLANT INOCULANT AT PLANTING TIME PER MANUFACTURER'S DIRECTIONS. SPACE PLANTS ACCORDING TO PLAN. TYPICAL PERENNIAL PLANTING \ J NO SCALE IRRIGATION OF SEEDED AND PLANTED AREAS AS MAY BE REQUIRED TO COMPLETE THE WORK. 19. PROVIDE THOROUGH WATERING OF ALL PLANTS IMMEDIATELY AFTER INSTALLATION. THOROUGH WATERING SHALL OCCUR ONCE WEEKLY TO SUPPLEMENT NATURAL RAINFALL. WATERING SHALL CONTINUE 90 DAYS FOR ALL PLANTS. 20. ALL STONE SEAT SLABS AND BOULDERS SHALL BE FROM LOCAL QUARRY. SUBMIT REPRESENTATIVE STONE SAMPLES TO OWNER FOR APPROVAL PRIOR TO ORDERING. 21. CONTRACTOR SHALL SUBMIT NATIVE SEED MIX & SOURCE FOR REVIEW AND OWNER APPROVAL. PLANTING AS SHOWN ON PLANS TOP OF MULCH SHALL BE EVEN WITH WALK. PLANTING SOIL FINISH GRADE SHALL BE 2" BELOW CURB OR WALK ELEVATION. STRUCTURED EDGE AS PER PLANS PAVEMENT OR CURB SUBGRADE AS PER PLANS SLOPE EDGE OF COMPACTED BASE AND SUBGRADE AT 45 DEGREE ANGLE UNDISTURBED OR COMPACTED SUBSOIL V 4J C m 4J 3 h E o � h U T U o z Q) L 0 _ D 0 � O M a N N 3 0Zw wOw N Z >i? OWZ ww a 0�zF <000 Uu I: ^Fw LL n z 'w p LL Z_ 2w 0 _zz z a w < < v d,U�n = 0 J W 5 'w_' a <12ow U >m<O S wp 3 .wf< ww< w U a<�w mmmm z , ,cl z _ < Z Z K _ 3 < d U J J rV) V Z C) J O uj 'LLJ v O CZ L Z Lu N N Z U Q O U J w Y Q Ln J_ Q W in u Z_ H Z O REVISION DATE 1 4/l/2016 CITY SUBMITTAL SURVEY DRAWN RTM DESIGNED MRP CHECKED MRP APPROVED MRP PROD. NO. 193803412 SHEET NUMBER L8.01 Lake Lucy Road PRELIMINARY PLAT, REZONING, & VARIANCE APPLICATION Lake Lucy Road Residential Neighborhood Chanhassen, MN By: Yosemite Holdings, LLC Terrry Forbord, Principal 4-1-2016 Ty RECENEp °er APR U l 2U16 GHANHA$KN PLANNING QE" ® Stantec YOSEMITE Holdings, LLC April 1, 2016 City of Chanhassen C/O Bob Generous, Senior Planner PO Box 147 Chanhassen, Minnesota 55317-0147 RE: Submission of application for rezoning, preliminary plat and variances to develop a neighborhood consisting of 12 home sites in the northwest corner of Lake Lucy Road and Yosemite Avenue Dear Mr. Generous, Planning Commissioners and City Council members: I am very pleased to submit our application to initiate the City's review of our next great Chanhassen neighborhood. I have been fortunate to have been involved in the development of several important projects in Chanhassen throughout my career, including Near Mountain, Longacres, Springfield and the Highlands at Lake St. Joe. Each of these projects presented their own distinct opportunities and challenges and all of them were improved as a result of the guidance and assistance of the City's excellent staff. This project continued that tradition. This proposal is for the development of an infill site and like many others this property has presented a number of challenges. I am grateful to the staff for working closely with our team as we sought design solutions to respond to the many development constraints that are present on this property. Candidly, I had hoped to find a plan that would yield more lots, but in the end I am confident that we have created the plan that best fits this site and is the best compliment to its surroundings. We look forward to hosting a neighborhood gathering at the Chanhassen Recreation Center on April 7 and to the opportunity to present our project to the Planning Commission and City Council. I am confident that you will agree with me that our proposal will result in the development of another great Chanhassen neighborhood. It is a pleasure to be back working in Chanhassen. Sincerely, Terry Forbord Yosemite Holdings LLC Stantec 2 LAKE LUCY ROAD, YOSEMITES HOLDINGS, LLC RESIDENTIAL NEIGHBORHOOD SUMMARY OF REZONING, SUBDIVISION AND VARIANCE APPLICATION Yosemite Holdings LLC respectfully requests approval for a rezoning, subdivision approval and three variances for flag lots to authorize the development of a 12 lot subdivision located in the NW Quadrant of Lake Lucy Road and Yosemite Avenue in the City of Chanhassen. We have reviewed the application checklist, submitted all of the required items and the relevant fees and believe our application is complete to initiate the City review and approval process. COMPREHENSIVE PLAN CONSISTENCY The Subject property is guided Low Density Residential In the Chanhassen Comprehensive Plan which is consistent with the rezoning to RSF District zoning that we are seeking. The Comprehensive Plan supports the policy of zoning the property RR Rural residential until municipal utilities are available to support development at densities consistent with the City's 15,000 sq. ft. minimum lot size. The City has fulfilled its plans to provide municipal sanitary sewer and water to serve this property and the developer is seeking the rezoning required to extend these utilities and develop the land as anticipated in the Comprehensive Plan. REZONING FROM RR RURAL RESIDENTIAL TO RSF SINGLE FAMILY RESIDENTIAL DISTRICT With the availability of municipal water and sanitary sewer service to the property the existing property owners have elected to sell their property. The rezoning from RR District to RSF District is fully consistent with the Comprehensive Plan now that the City has constructed the utility services to the area to improve this property. SUBDIVISION APPROVAL The City of Chanhassen's minimum lot size in the RSF District is 15,000 sq. Ft. The Subject Property contains a total of 390,563 sq. ft. (8.96 acres). As the development summary on Figure C1.01 shows, this gross density is reduced by 38,687 sq. ft. of existing street right-of-way from Lake Lucy Road and Yosemite Avenue and an additional 41,629 sq. ft. for the street to serve this subdivision. There is also 32,984 sq. ft. of delineated wetland area within the property boundaries and the City ordinance requires an additional 17,404 sq. ft. of wetland buffer area surrounding the wetland boundaries. The combination of all of these factors reduces the total net acreage of the property to 259,895 sq. ft. (5.96 acres). Pursuant to the Comprehensive Plan, this area is sufficient to support just over seventeen (17), 15,000 sq. ft. lots. However, the shape of the property, configuration of the wetlands, the site topography and access limitations make it impossible to utilize the property to this level of efficiency. These factors combine to yield a total of only 12 single family lots. All of these lots exceed the City's 15,000 sq. ft. minimum lot size and all of them are configured to accommodate a minimum of 70 ft. wide pad sizes. Many of the pads are 80 ft. wide and several lots exceed 20,000 sq. ft. in area and are fully consistent with the general image and character of Chanhassen's low density single family residential district. VARIANCES REQUEST JUSTIFICATION The factors listed above all justify the approval of three simple variances that will allow the property to be put to a reasonable use without jeopardizing the essential character of Chanhassen's single family neighborhoods. Each of these factors is also graphically illustrated on exhibits that are attached to this narrative. Again, all of the proposed lots exceed the lot area requirements and all will accommodate large house pads. The difficult shape, tight dimensions along the western boundary, access limitations and the shape of the wetlands and buffers all combine to necessitate three flag lots. These proposed flag lots are lots 5, 8 and 9. All of them contain well over the minimum lot sizes and all of them have generous building pads. It is the dimension of the north western site boundary that makes it impossible to meet the letter of the code for these highly desirable park -view lots. The following information describes all of the ways in which the Subject Property complies with the conditions and criteria needed to justify the requested flag lot variances. The following is taken directly from Sec. 18-22 —Variances in the Chanhassen Code. Sec. 18-22. - Variances. The City council may grant a variance from the regulations contained in this chapter as part of the plat approval process following a finding that all of the following conditions exist: (1)The hardship is not a mere inconvenience; (2)The hardship is caused by the particular physical surroundings, shape or topographical conditions of the land; (3)The condition or conditions upon which the request is based are unique and not generally applicable to other property; (4)The granting of a variance will not be substantially detrimental to the public welfare and is in accord with the purpose and intent of this chapter, the zoning ordinance and comprehensive plan. The property has an irregular shape due to surrounding subdivision patterns. It contains two irregularly shaped delineated wetlands that require 50 ft. and 55 ft. of wetland buffer and setbacks. The site also has access limitations and constraints along both Lake Lucy Road and Yosemite Avenue, including a spacing requirement from Lake Lucy Road along Yosemite Avenue to accommodate safe traffic queuing. Required setbacks around the perimeter of the property (rear yard and some side yard setbacks) further complicate the challenges associated with the shape of the parcel. Adding to the challenge of putting the property to a reasonable use is its topography and the limited depth of the sanitary sewer pipe that will serve the development. In our presentation before the Planning Commission we will provide a more complete description of the numerous site plan alternatives that have been explored and reviewed with City staff. There are two exhibits that illustrate existing, limiting site conditions; (pages 4 & 5). An added four exhibits included in this submission packet that are labelled Sanitary Sewer Serviceability Study (pages 6 —10). Each of these illustrate development constraints due to the project topography in relation to the elevation of the ® Stantec 3 sanitary sewer pipe that will serve the property. These exhibits each describe different aspects of this constraint as it relates to different development concepts, but the essential point is that a significant portion of the property does not offer basement elevations that are high enough to drain by gravity into the sanitary sewer system. This fact, when coupled with the other constraints listed above, has caused the Development Team to explore numerous design alternatives. Each of these have been reviewed and discussed with City staff, including numerous options for site grading, sewer lift stations, grinder pumps and other forms of pressurized sewer systems before the proposed plan was selected. The relationship between the physical conditions of this property and the existing sanitary sewer elevation is a practical difficulty that is unique to this property. A review of the great lengths the Development Team and staff have gone to find an acceptable solution proves that these sewer service constraints present more than mere inconvenience. The result of granting the requested variances results in a subdivision that meets the purpose and intent of Sec.18-22 Variances and the comprehensive plan and zoning ordinance. The consequences of the hardships and practical difficulties facing the development of this parcel are directly related to its distinct physical surroundings, shape, topography and natural conditions; and they present challenges that go well beyond mere inconvenience. As previously mentioned the property contains 259,895 sq. ft. (5.96 acres) of developable land net of wetlands and right of way. Pursuant to the comprehensive plan and zoning ordinance this is sufficient land area to support 17 lots, based on the required 15,000 sq. ft. minimum size. The requested variances to allow three flag lots will allow the property to accommodate a total of 12 lots that all exceed the 15,000 sq. ft. minimum. Consequently, the result of granting the requested variances is reasonable. Conversely, failure to grant these variances would deny the property owners a reasonable use of their property, as defined by the Comprehensive Plan, zoning ordinance since all of the conditions in Sec. 18-22 have been met. In summary, the conditions that justify the granting of these variances are unique to this property and are distinct from the conditions on any other property in the City. The granting of these variances will allow the property to be developed for single family detached housing in accordance with the comprehensive plan and zoning ordinance. The proposed lots will all meet or exceed the 15,000 sq. ft. minimum lot sizes and will be served by sanitary sewer and water and the neighborhood will be served by new storm water ponding and conveyance systems and will cause no adverse impacts to the public welfare. The proposed variances meet all four required conditions contained in Sec. 18-22 variances. We respectfully request the approval of these variances to allow the property to be put to a reasonable use, consistent with the goals of the comprehensive plan and the purpose and intent of the Chanhassen Zoning Code. SUMMARY AND CONCLUSION The application by Yosemite Holdings LLC is fully consistent with the Chanhassen Comprehensive Plan. The rezoning from RR Rural residential to RSF Single family Residential is also fully consistent with the Comprehensive Plan now that the City has provided municipal utility services to the property. Finally the requested variances to permit three flag lots meet all of the requisite conditions required in Sec.18-22 of the Chanhassen Code. The conditions found on the site go well beyond mere inconveniences and they are unique to this property, The result of granting these variances is reasonable and the proposed subdivision will be fully consistent with the essential character of Chanhassen's single family neighborhoods. We respectfully request approval of our application and we are pleased to bring this fine new neighborhood community to the wonderful City of Chanhassen. ® Stantec 4 * Perimeter property - dimensions, and standard lot width criteria, result in fractional lot size differences and / inefficient land use. / I II I Low Point 1004 Wetland & Buffers / .40, \ 1 High Point; \ 1032 i -i 1 Low Point 1 1002 I I 1 Wetland & s Buffers r I I Culvert/fI I C' IL` oio foint - - - - Lake Lucy Road _ _ _ _ limited c 0' 40' 80' 160' NORTH -------__ V:1938/ACTIVE/1938034)2/GRAPHICS/LAKE LUCY NARRATIVE GRAPHICS.INDD I 1 1 1 1 I I I LIMITING EXISTING CONDITIONS ��° PRACTICAL DIFFICULTIES THAT SATISFY VARIANCE CRITERIA Property, Access, Grades, Wetlands & Buffers Inefficient, mij environmentally disruptive access location II I i The property has an irregular shape due to surrounding subdivision patterns and ownership. It contains two irregularly Q shaped delineated wetlands that require 50 ff. and 55 ft. of _� wetland buffer and setbacks. �E- Io The site also has access limitations and constraints along both > Lake Lucy Road and Yosemite Avenue, including a spacing requirement from Lake Lucy Road along Yosemite Avenue to accommodate safe traffic queuing. 3 o The following exhibits each describe different aspects of site r constraints. The essential point is that a significant portion of I the property does not offer basement elevations that are high enough to drain by gravity into the sanitary sewer system. Best Access Elev. 1010 Maximum distance for neighborhood access, to provide sufficient traffic queuing I i �D LING SANITARY R PIPE ATION 1007.96' .rcaa F1lirl�rrery,_�,� \ \ \ -r— —016- Lake Lucy Road Chanhassen, MN Yosemite Holdings, LLC 4-1-2016 -1 r 5 Bio-Retention'.- Pond 10 IIII / 1 T ! 44 - - - - - - - I ® __-- - -: o• ao' _I eo• tba _-„_ NORTH -------__ V:1938/ACTNE/193803412/GRAPHICS/LAKE LUCY NARRATIVE GRAPHICS.INDD LIMITING EXISTING CONDITIONS PRACTICAL DIFFICULTIES THAT SATISFY VARIANCE CRITERIA Property Shape, Access, Grades, Wetlands & Buffers Wet Ponds, Bio-Retention Ponds The property has an irregular shape due to surrounding subdivision patterns. It contains two irregularly shaped delineated wetlands that require 50 ff. and 55 ff. of wetland buffer and setbacks. The site also has access limitations and constraints along both Lake Lucy Road and Yosemite Avenue, including a spacing requirement from Lake Lucy Road along F— Yosemite Avenue to accommodate safe traffic queuing. Required setbacks around the perimeter of the property (rear yard and some side yard setbacks) further complicate the challenges associated with the shape of the parcel. Adding to the challenge of puffing the property to a reasonable use is its topography and the limited depth of the sanitary sewer pipe that will serve the development. The neighborhood will be served by new storm water ponding and conveyance systems, that, while causing no adverse impacts to the public welfare, further limit site use and impose further practical difficulties. Lake Lucy Road Chanhassen, MN Yosemite Holdings, LLC 4-1-2016 ® Stantec 76 AREA OF SITE ABLE TO BE SERVED BY EXISTING SANITARY SEWER ELEVATION AS IS s7 E>fv.tozs.� • rm Eity-,oze.> 1r - i E�-,xza EXISTING SEWER SERVICABLE AREA 1-+ 0 c EIEV=t409.90 - r MIN. BASEMENT.. + ELEVATION r 1,014' u 1E _ Env-,o,o.zo _ r VARIANCE FINDINGS: Sanitary Sewer Serviceability Study EXISTING CONDITION Basement Levels: 31 % of site can be served without grading (cuts). (Area shown is above 1,014') Assumptions Sanitary sewer main, 8" pipe at 0.5%. Sewer service line 4" at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5' and 1,014.5'. A 1,014.0' elevation was used for a average m minimum basement elevation. • Front building pad: An 8' difference between garage floor and basement floor was used to determine front - building pad elevation. Front pad elevation - average 1,014 + 8' =1,022'. m EXISTING SANITARY �6 SEWER PIPE ELEVATION 1007.96' G_ vn xx-3ov ZE330 VN W+lll6 Lake_ Lucy ROa -- �- Ga 040' 80' 160' ® _ - 9W �., snwm ,��` uvs n � "� i •_._ , NORTH V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY NARRATIVE GRAPHICS.INDD • Street grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2' below garage floor or 1,022 - 2'=1,020' Areas above 1,014' Elevation Lake Lucy Road Chanhassen, MN Yosemite Holdings, LLC 4-1-2016 ® stantec 7 AREA OF SITE ABLE TO BE SERVED BY EXISTING SANITARY SEWER ELEVATION BY FILLING "', °�mnlldlllllllllllllllllll; ,o. oa =oz. PROPOSED MINIMU BUILDING AREA ELE -'iz- - E Y EtEV=raze.+ i se + EiEv-tozst -r---Rrliriillllllllll -- -- _- 1W VARIANCE FINDINGS: Sanitary Sewer ' Serviceability Study a= = / a- g ELEv=LR.m c a, ELEV=I00Jg -. i/Illlllllllllllllllllllllllllllllllllllllt P 4u MIN. BASEMENT ELEVATION 1,014' ea 6-9 eLEv=10020 8 0 ELE -loll] A , r Y° � o a nIII nunnnnnnnllWnnunnn1Tn111 sEo FILL IN EXCES%y, OF 10' REQUIRE SPECIAL MATER"ALS AND COMPACTION - SEE SOIL REPORT $ Wv=5say i _ _ CB=933.10 IMJ X=GL Lake Lucy Roadgm- ® ---- - 0= 40' 80' 160' REiiiiiii _ ......_. _y . _._ NORTH V: 1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY NARRATIVE GRAPHICS.INDD a, 0 0 52 l�l I I H l l \\11�N7Pll •,ulr - = _ G oeaQUP _—_-illll{{INIIIIIUN11111N11- EXISTING SANITARY SEWER PIPE .ELEVATION 1007.96' sux nr ,ov rove .l.le h — B.. GB --- __ tow— ,o tor, PROPOSED CONDITION Fill Requirements Basement Levels: 51 % of site must be served via grading (fills). (Area shown is above 1,014') Assumptions • Sanitary sewer main, 8" pipe at 0.5%. Sewer service line 4" at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5' and 1,014.5'. A 1,014.0' elevation was used for a average minimum basement elevation. • Front building pad: An 8' difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8'=1,022'. • Street grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2' below garage floor or 1,022 - 2'=1,020' Areas above 1,014' Elevation Lake Lucy Road Chanhassen, MN Yosemite Holdings, LLC 4-1-2016 ® stantec a / I 1 ,010 ory 0p , )� \ ELEv=I009.90 0 1 a `\ALL FRONT YARDS WITH --�3 a STREET MUST BE ABOVE° a m THIS ELEVATION 1,020.0' Q - S-] �sa t C m Env=1oz8.] sa , — u C i P 61 X Eo ELv=i0ii3 ELEv=�0i0-z0 8 0 o ------- - --- - - ----- I Fill,, -0 p '� P e jO O ry O a � I , / °,��____—,bra II � \ I , 1 l I c � I vx rm-wn �xv w-ss.Ls -- _—__— Jlv -- — - - - - � ®_vss.�e=91+E-= _ •f icy Lake Lucy Road GB — — - „�... �. NORTH V:1938/ACTfVE/193803412/GRAPHICS/LAKE WCY NARRATNE GRAPHICS.INDD VARIANCE FINDINGS: Sanitary Sewer Serviceability Study EXISTING CONDITION Street & Front Yards: In order to serve a basement elevation of 1,014', the garage floors need to be at 1,022', and the street needs to be at 1,020'. (Most of the site is be- low elevation 1,020') Site is too low, to fully served by the existing sanitary sewer invert) Assumptions ■ Sanitary sewer main, 8" pipe at 0.5%. Sewer service line 4" at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5' and 1,014.5'. A 1,014.0' elevation was used for a average minimum basement elevation. • Front building pad: An 8' difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8'=1,022'. • Street grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2' below garage floor or 1,022 - 2'=1,020' Areas above 1,020' Elevation Lake Lucy Road Chanhassen, MN Yosemite Holdings, LLC 4-1-2016 rN / 10 VARIANCE FINDINGS: --_ Sanitary Sewer Serviceability Study FILL IN EXCESS OF 10' REQUIRE SPECIAL MATERIALS /I s AND COMPACTION SEE SOIL REPORT Eity=ioa9.m c PROPOSED FRONT PAD AREA ELEVATIONS INV r 1,022' & 1,024' 1011.06.m, i /O - S) ELEV+IOb2 # ,- � + REV=1pd9' ' ea x EtEv=10IJM O 71,A 0 II o °y b o*j �o INV 1009.18 FILL IN EXCESS ELEV. 1,020' it OF 10' REQUIRE - SPECIAL MMERIALS `At4 'COMPACTION SEE SOIL REPO INV a�a - 1008.58 - i _ r _ - - - ._OHP _---9�� ,.,u-.9tlP •a— _\�` _, o EIS-NJm tom_ L-Ke LUCy Road =low,-- �� 92L --- - NORTH V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY NARRATNE GRAPHICS.INDD CENTERLINE ROAD ELEV. 1,010.0" EXISTING SANITARY SEWER PIPE ELEVATION 1007.96' fYIRA I021.12 B INV 100t.96 PROPOSED CONDITION Fill Requirements Street & Front Yards Due to existing sanitary sewer invert elevation, at least 25 % of site must be served via grading (fills). (Area shown is above 1,014') Estimated fill volume result: 20,000 - 25,000 yards Assumptions • Sanitary sewer main, 8" pipe at 0.5%. Sewer service lines 4" at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5' and 1,014.5'. A 1,014.0' elevation was used for a average minimum basement elevation. • Front building pad: An 8' difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8'=1,022'. • Street grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2' below garage floor or 1,022 - 2' =1,020' Areas above 1,020' Elevation Lake Lucy Road Chanhassen, MN Yosemite Holdings, LLC 4-1-2016 stantec YOSEMITE HOLDINGS, LLC LAKE LUCY CHANHASSEN, MN VICINITY MAP rrr:z•131:� rr:rr;r�: GENERAL GO.02 LEGEND AND ABBREVIATIONS SURVEY V3.01 ALTNACSM LAND TITLE SURVEY CIVIL D0.01 REMOVALS PLAN C0.02 TREE REMOVALS PLAN C0.03 TREE INVENTORY C1.01 PRELIMINARY PLAT C2.01 TEMPORARY EROSION AND SEDIMENT CONTROL PLAN C3.01 GRADING PLAN C4.01 SANITARY SEWER AND WATERMAIN PLAN C5.01 STORM SEWER PLAN C9.01 CITY OF CHANHASSEN STANDARD DETAILS C9.02 CITY OF CHANHASSEN STANDARD DETAILS C9.03 CITY OF CHANHASSEN STANDARD DETAILS C9.04 CITY OF CHANHASSEN STANDARD DETAILS LANDSCAPE ARCHITECTURE 1-1.01 PLANTING PLAN L8.01 PLANTING DETAILS PROJECT DIRECTORY CLIENT: YOSEMITE HOLDINGS, LLC TERRY FORBORD, PRINCIPAL 4960 SUSSEX PLACE SHOREWOOD, MN, 55331 PROJECT MANAGER AND CIVIL ENGINEER: STANTEC CONSULTING SERVICES INC. ROGER HUMPHREY PE, RLS 2335 HIGHWAY 36 WEST ST. PAUL, MN 55113 ROGER.HUMPHREY@STANTEC.COM TEL 651-9674652, FAX: 651-636-1311 LANDSCAPE ARCHITECT: STANTEC CONSULTING SERVICES INC. MARC PUTMAN 2335 HIGHWAY 36 WEST ST. PAUL, MN 55113 MARC.PUTMAN@STANTEC.COM TEL 651-96T4554, FAX 661-636-1311 STANTEC PROJECT NO: 193803412 DATE f C"susmIrt I NAB. M. 1.12 G0.01 EXISTING TOPOGRAPHIC SYMBOLS SURVEY SYMBOLS EXISTING TOPOGRAPHIC LINES GRADING INFORMATION U > STORM SEWER APRON rn PEDESTAL CAN A\ (1) $ BASKETBALL POST Ra PEDESTAL COMMUNICATIONS m�nAa. AERIAL CONTROL POINT _ - -' 0 BAO(SIGHT CONTROL POINT RETAINING WALL - - _ _ _ - 952- - EXISTING CONTOUR MINOR ^ BARRICADE PERMANENT ® POST INDIGTDt VALVE — x x x x FENCE - BARBED WIRE / \ 950 - FOLISTING CONTOUR MAX)R ® GPS CONTROL POINT aFENCE - CHAIN LINK 952 PROPOSED CONTOUR MINOR BENCH �' POLE -COMMUNICATIONS FENCE - DECORATIVE 9SO PROPOSED CONTOUR MAIOR 41 o BOOSTER STATION POLEGUY ® IUDICIAL LAND MONUMENT o o FENCE - STOCKADE .................. PROPOSED GRADING LIMITS / SLOPE LIMITS ® MONUMENT COMPUTED O FENCE -WOOD x g53.53 x 5TA:5.BT.LS PROPOSED SPOT ELEVATION v, ; m ° A BUILDING LOWEST OPENING 9',E POLE -LIGHT x K K X FENCE - ELECTRIC M.87 2 ® BURIAL CONTROL MONUMENT Y POLE-POWER • MONUMENT IRON FOUND GUARD RAIL 1:4 RISEAUN (SLOPE) i O MONUMENT IRON SET TREE LINE O BUSH DECIDUOUS �' POLE -UTILITY - - - - - - WETLAND O CATCH BASIN BEEHIVE yy POLE-IfTILRY SERVICE A RESERED POINT ABBREVIATIONS _ • CURB BOX . POST ■ ROW MONUMENT SURVEY LINES AD ALGEBRAIC DIFFERENCE 2— - ROW MARKER POSE BV BUTTERFLY VALVE °w CATCH B09R1 PROPANE TANK ,°.5" BOUNDARY 4 CENTERLINE BVCE BEGIN VERTICAL CURVE ELEVATION V1 O COLUMN O PICNIC TABLE SECTION CORNER ________________-____________ _ -- - EXISTING EASEMENT LINE BVCS BEGIN VERTICAL CURVE STATION zo 4 ® CONTROL BOX SIGNAL • SAMPLING WELL � TRAVERSE CONTROL POINT -______________ PROPOSED FfSEMENT LINE `- CENTER LINE ROOD PLAIN BOUNDARY CL CUSS S W ® CLEAN OUTaocrc (SEWER) f m BENCH MARK LOCATION CMP CORRUGATED METAL PIPE p ROCK - - - - - - - - - - - - - _ - _ - EXISTING LOT LINE C.O. CHANGE ORDER = PROPOSED LOT LINE o •a`^ CULVERT END AN RR SIGNAL CONTROL BOX PROPOSED TOPOGRAPHIC SYMBOLS DIP DUCTILE IRON PIPE rr - - DUSTING RIGHT-OF-WAY R/ELEV ELEVATION C7 DRINKING FOUNTAIN 0� RR CROSSING GATE O BOLLARD wg v 2 - - - LINE SETBAIX LINE SETBACK EVCE END VERTICAL CURVE ELEVATION f£- ENERGY DISSIPATER $ RR SIGNAL • SANITARY QEANOUf EVCS END VERTICAL CURVE STATION- - - SECTION LINE 'TOLaL FLAG POLE G REGULATION STATION GAS MANHOLE QUARTER SERMON LINE IX EXOSTING SDREQfTM SECTION LINE FFS FOULED END SECTION Ly FUEL P UMP IF SATFI I TTF D7511 � SANITARY OR STORM LIFT STATION F/F FACE TO FACE FM FORCE MAIN E- GUY WIRE C P SETIC TANK 0 STORM SER BEEHIVE CATCH BASIN SEWER EXISTING UTILITY LINES F.O. FIELD ORDER GRILLx SEPTC VENT ■ STORM SEWER CATCH BASIN GV GATE VALVE FM FM FORCE MAIN HP HIGH POINT Ti. HANDICAP SPACE SEPTIC DRAIN FIELD � STORM SEWER FLARED END SECTION .— SANITARY SEWER HWL HIGH WATER LEVEL 17 HANDHOLE p SIGN -------'--- SANITARY SERVICE INV INVERT Z ■ STORM SEWER OUTLET STRUCTURE »x•- STORM SEWER K CURVE COEFFICIENT U P FIRE HYDRANT Q SOB BORING I I I i WATER MAIN LP LOW POINT 0 STORM SEWER OVERFLOW STNCTURE WATER SERVICE MH MANHOLE (SANITARY) J UJ •+ HYDRANT P/MNT MARKER (REFLECTOR) • enas STAND PIPE GAS • CURB BOX NTS NOT TO SCALE ' ^ Q O x HYDRANT VALVE SPIGOT WATER PROPOSED UTILITY LINES NWL NORMAL WATER LEVEL V Z z FIRE HYDRANT PO POITTroFCURVE ° INLET (SMALL DMA) smwcsu SPRINKLER HEAD PCC COMPOUND CURVE = • WATER REDUCER — FM— FM— FM— FORCE MAIN z ® LIFT STATION CONTROL PANEL C" SPRINKLER VALVE BOX -> —> —> —> - SANITARY SEWER PI POINT OF INTERSECTION O U i VALVE »->----->-+- SANITARY SERVICE It PROPERTY LINE _ - 0 0 ® LIFT STATION DRY WELL q STUMP >_ PPVC PERFORATED PO.YVBM CHLORIDE PIPE Q z < :g RIP RAP ----------------- STORM SEWER DRAINTILE W Q LIFT STATION WET WELL —»—»�»— STORM SEWER PRC POINT OF REVERSE CURVE H Z •Gsv+ SERVICE -GAS POINT ON LINE -.► DRAINAGE ROW Pi POINT OF TANGENT C w LIGHT YARD .sssn SERVICE -SANITARY SEWER POINT ON LINE —1—ICI-1— -�� - -- - - - - WATER MAIN WATER SERVICE PVC POLYVINYL CHLORIDE PIPE W (-) BVIA PEDESTRIAN RAMP PVT POINT OF VERTICAL INTERSECTION N LOOP DETECTOR • s*ssv SERVICE -STORM SEWER POINT ON LINE > _ PIPE CASING R RADIUS O 111 MAIL BOX •w.s n SERVICE -WATER POINT ON LINE RCP REINFORCED CONCRETE PIPE } Y Q N MAIL RELAY BOX EXISTING PRIVATE UTILITY LINES FUTURE UTILITY LINES R/ FSS T TELEPHONE BOOTH STORM SEWER srRLICRI[IE ® MANHOLE -AIR RELEASE — Crvn GN.O CIV D CABLE TV QUALITY LEVEL D FM FM FM FORCE MAIN STA STATION C, TRANSMISSION TOWER ELECTRIC MC mC mry — QUALITY CABLE N LEVEL C —> >>> _ SANITARY SEWER TOE TEMPORARY CONSTRUCTION EASEMENT ® MANHOLE -HEAT FFs TEST PIT LOC —crva—Crv-e—Crv-B CABMEN LEVEL QUALITY SANITARY SERVICE TNH TOP NUT HYDRANT OQ MANHOLE -GAS gym, — CNa Crv-A ON -A CABLE TV QUALITY LEVEL A _.--------- STORM SEWER DRAINRLE TYP TYPICAL 5714 TRANSFORMER POWER - F0.D FO-D FO-D FIBER OPTIC QUALITY LEVEL D - >> >> >> STORM SEWER VC VERTICAL CURVE eK) MANHOLE -POWER - TREE DEAD - FOC FOC — FOC FIBER OPTIC QUALITY LEVEL C WATER MAIN WM WATER MAIN ® MANHOLE-SWrtARY SEINER — F0 FO-B FOd FIBER OPTIC QUALITY LEVEL B - - - WATER SERVICE TREE -CONIFEROUS - PO -A F6A FO-A - FIBER OPTIC QUALITY LEVEL A - PIPE CASING NO REYBION DATE s MANHOLE -STORM SEWER E-0 E-0 E-0 POWER QUALITY LEVEL HATCH PATTERNS I 4/1=16 TREE -DECIDUOUS EC EL EC POWER QUALITY LEVEL C CRY SUBMWAL © MANHOLELOMMUNICATION9 a TREE Es Ea EA POWER QUALITY LEVEL B 0 MANHOLE -UNKNOWN -FRUIT EAEA EA POWER QUALITY LEVEL A CONCRETE CURB AND GUTTER //�I HEAVY DRY RTUMUIWS SANDe TRASH CAN Go G-o G-o GAS QUALITY LEVEL D _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ EXISTING ��Ld MANHOLE -WATER 2 METER POWER o--o TRAFFIC SIGNAL OL G6 O-C O-C O-B I-B GAS QUALITY LEVEL C GAS QUALITY LEVEL 8 PROPOSED FUTURE BTl1MII101K BEDROCK VALVE GAS G-A G-A G-A GAS QUALITY LEVEL A DEMOLITION •s+�FA METER GAS oa VALVE Go w Go COMMUNICATION QUALITY LEVEL D suvn wrmN ORDINARY HIGH WATER MARK wwa. VENT GAS cc c c-c-c COMMUNICATION PROPOSED PRIVATE UTILITY LINES CONCRETE �^ ��:� GROUND rxArm Brn GB Ge COMMUNICATION QU LITY LEVEL BOUfIE'f CONDOL STRIIRURE D WATE0. REDUCER GA oA G A COMMUNICATION QUALITY LEVEL A - m.c cwz GTVC- CABLE TV Q PARTING METER D OHP OHP ONP OVERHEAD POWER G-C D-C GC GAS AGOr.02 WELL -MONITORING - ONO ONO OHC OVERHEAD COMMUNICATION OC u c.c COMMUNICATION GRAVEL s PEDESTRIAN PUSH BUTTON - OHu OHu ONU OVERHEAD UTILITIES OHP 0HP ONP - OVERHEAD POWER - PEDESTAL POWER WELL WATER i i ! Ui eIP: nTTEr. . QNBI:p6W xNa®1 I � �v 6_1 JEm) I�qb / N�a i SBl°121p•B Nap DA /' as � ] • N't A $�Tl�TblEaeeEscrnlBla i ($ a +pp�yQpp R] �I♦��m� 7 \ \ n // Sal 11 1 pl\• ei✓_I ar as \ _ \ NMIIiOot®leNrppD-'< \ a g■ \ S9(Y.I�W 017 1 � / "R� \ V aI HOUSE"°i 11 J --- 8 neao(a.p la.pau w]e.LW myp(ppll t.�ly F , S- ——:t9.----_ _ � 4VM1➢ERTIE9JfIFKT---- �- - _ \\� -NIMRrP611111$[NirMx____ -- \ L WM]p165g 1TWv xf41M_a9 \\ _-- s!1 M i auG 1 a� I � ALTA/ACSM LAND TITLE SURVEY I I I VICINUY MAP -I� J K1v . r u v �l L wlwiox yLll I .. sue �`�]NS WNI10MA'MTML \ ll ( R A- �— \ SpIIMMB]CQIPBICf AVXIxM�sar+a�l,p -_ l4} s4 ilNP.IM, aXan _ .P .� . -t9pIl1EASPmN616TtMm1]casual � \W]M.LINE3� 'a__ I�A4l / Gal21 ,- vN(MTpaWpB,asg zTNr.IIa ` w,uaPW]aar M6D lUltae,mzllrasrmllw.5lp �- ITEMS CORRESPONDING TO SCHEDULE B Ram Ix. S jM to Yosemite Pend as Golan on avalGme mane. SHOWN ON 5110.Y£Y. Item 13'. s JM m btr Wry lane as Gown m awlalm maps. SHOWN w wavn. LT FILE NO. 531257 LEGEND PROPERTY LINE - - - - AIGNT-OFWAY LIM LINE _----__-_-- IX. CURB B GUREFt SIINITIM SEWER STORM SEWER IX, WATER MAIN GB — BURIED GAS MAIN H BURIED EL C GIV A LUTILITIES —CIVB— CABLE TELEVISION 0 BOLLARD ROAD SIGN m PARNTNG METER Gar milt( mS PYLON SIGN j'X LIGHT BOLE ® iTUeLSTORMER OE ROWER BOX GMT CULVERT © TELEPIWNF BOX 0 uGlrt POLE Is HAND HOLE p PCWER IWx L MINWS/'REA ® TELEPHONE BOX 0 CONCRETE (- POWER P<U OO CABLE TV BOY I0 So 10D N Horlmnbl Sak [n Feet • DENOTES IRON MONUMENT MUND DENOTES 1/2 INCH BY IA INCH IRON MONUMENT SET WITH I]LILSTIC PLUG INSCRIBED WITH e3133 x�g E ,p+�ffi3-Y �€Fa�fi LAND DESCRIPTION PMCELA ; St �I M vnat Mn,r me NOeeM warm, amz Tww leon ,p ue. avl9G a, ,.e. Cmnn, Innneeb gentlest as rouoal. eylnanp at ue t x. mn-semen, Toxnzmo Eaualon9txe nerc 3m]et na 23;tmme.wmeng ma, weal na ra, (go North ,t(t .-"o to ; me North sMot reel t.a m t(a. -) e amm, Ma m a mmlm1 Mvseseas nes^mmeE.U1inT.mo@Mmuawarattam y, minth ,,me 01 Il at I lee Eedevl n[on,szd „ 116, age xse sail o Semon x and l; To sa Pontn melomSa9Mxn9Ca, m-Mho > als I610 .mkC earnM.mo IX me, part rct,on mmv Cetneen sail SM.on x anE x aM .1 mast 1m�. a tame, �l me stuns; t, xwm tone me 11, s to a mTev Ilea1.me: ten z s9l.., 1.s as tt eme-, an um maat mma e, xeO.s rat m me or a m,rea sln I G umn e, Ma - tell mte:o1 me, ,lm;:men.«.tans south..-sn.]m.mta a tam se].se rem: men.. wen ]x ]a, m me tam a an ew�nmrM, a�al,p m me ahem snm ao.anmat w,.ev,rcmE. een al 9MCEL 9 O tse, let ate swmW.a water ate Nwu,eu pm.,,a ISEwxEw) a5e]bn ]. Tgwaep Ile, ea,ge n. <esvdd a rWXma: stsMq es me saemeaa Tmv a ma xs U. a vq sawn ]. mnnlrM wemGN alwM eW Gwen W,e dGaa sE ua a wn nE w G almu� a eo ]m, t]el Nflvry ns raN1I4T. mare so,NMyms qa E Ile on �g'�F asolaa SEMI]. d mac xe v. m me Poin[ a mq�nn�ne, PsMCELC 11 Mn ma N Me 9m�eam, Qna acne xmem.. Quarts, N s®on ]. iwm 'm „s. Pans me, Me: eeelnmry ataantm, me smarm so, asreef amain ,ed S,uM..tM Q, alte ame Noenemt :Mmssale e]e mend maim 5 aloe ally,m . m; ortnx)]krt:ree<ewest BOa leas, 1]O.shImen¢ 'm Ins, me,.b FM le 8 t/x megaa,,, "no a no3 Mi],Nz WM BO ktt: team Sown x]5 hH b me Me es; . Naez Scum 395 ra,:., ccw Pom[ol Ceemnln9,Grver Caunry, Nlnnmb, SURVEY NOTES 1. lYempNex Yn,nvtllaPAaaLYEmOaG el MGeassemon. ebb/tGsGT 0aap2"rem ..T.I9lw,lTmvN,n[e,axNlv eef:Sagal.ea.. ,. x- ]xatates, .1. amxmNe,se.g,w.er Cneq cmQem syA.x xAou, lees+eYGeee z"mlaemw.pxesansea®Go.ol • om x as Tatle Ate. Mp I, LLYmA all se rebel: 16M, 16m, aM 1fi631tle Ley Imes. Gffiv. xx ss,l3x v. �n ben see mmnw,e<. s. Rrlttm ]aTWkAOWms: slm]axlewan.]wemcPa I.Ir Z Ory . per lb,lOs zm9z1 o9os e..an en amm+e sees a luh x. 19A, pc fB1A•b4. e. M,Iran aa. A41tlaN: TM 1. areas as o,Mest onal mnblm ..'seel. Mt (+H.9x avv). ]. Fb lferrs a[a>ar.. ffiMwW: Aa property. a awL xR PUM neLaa ea9v Oardmaam n. I. Fer Nang of. Aab,m.: xMe art no Mrxn9 a9wxs on eugat papmY. 9. Peter. llsaTWkfik.rds: I Memel Awn naeM seemM m eflYaM M 1Ne aalraeY.9a, e199oq,. CaWle, shh pItCM G, Ieoge mg -nee. I., as, Man 190 Tatl•A OMxJG:. Aden In ya wive eve provlM ey s.InNeY. sagWN ON sVRVEr. Ix feel A 4yM 9a, of ass Man a.so ha s. stem, eve as Pal IF sael.ma lea a9.al C prt as dsa m x aaoq,vl. i III ease agWn hvOvl a, Pam 4Is Gene mm'lael usa m MWae I¢G61d®1.•lY MatT x0. Y Pai Cl a z !N tl CERTIFICATION =O SC) 9 F y ~ 4 io vosemlR nmimm9G, LL[. bM 1Ny 6Cr EINV IeLe aateG IEC: W emry tent m�G m.PwolM am eM px..v wl WnxnrcM pau0 laert tame In a¢wmars Men ee ell MYNmum SbnMN Cme u y Q w 0.eouwmer,¢ 11"MI....'a ..mm,a.ImMesa000me. a oo,M any Ill all Neml, aM Imluma Irtms 1, x, 1,., I, .(a), xla], es, Il(�a ), II,, .N Is a naa A teem,. 1Ike awe arse mmPYlal on wen da. l7M, xols. n STAMRC . z Na,NGr, PMtaaw w slea ao Nal IbmIMdI a]tn oemlma m., mis �l'F: h•tY� V3.01 � s 1 I , i .I GENERAL SBE REMOVAINO,Ei V/ L I. ME CONTRACTOR SHOULD EJIPECI TO END TELEPHONE UN¢, ELECTRIC IIFIES. ENGINEER. AND MR THE I GASMAN. AND OTHERPUBLICMENCE Of ME 11C. TO ME CONTACTOR®BTOR . ME E SPECIFICATIONS INCLUDE OPERATORP VIDEDNFORMAATION RECEIVED .@/ - FROM ME VARIOUS U71L11I¢. IF THERE IS CONFLICT BETWEEN TIE / y / I , D ID •� OPERATOR -PROVIDED INFORMATION AND ME UTILITYINFOWNTON / / IN ME SPECIFICATONS BY ME ENGINEER, ME OPERATORS VIDEDINFORMATION SHALLCONTROL NEITHER ME OWNER (n K NOR THE ENGINEER WARRANTS MS INFORMATION TO BE ACCURATE OR COMRFIE. ASMECONTRACTOR.INCOOPERATONWIIHMEAPPROPRIAT: m.'{ MLTIV COMPANIES, IS RESPONSIBLE TO VERIFY ME LOCATION. ME, AND DEPTH ;! _ P.' 2 ME COOF ALL MUFFS PRIOR TO ANY CONSTRUCTION ACTIVITIES. 9 P NTIFACTOR G RESPONSIBLE MR VERIFYING ME CONDTITONS OF ME SIZE � TI SAWCMACLEANEOGEBDWEENPAVEMEJSTOREMAINANDPAVEMEVSTO / / / [7 / I F =, / • �' '• P / I BE REMOVED. 4, CONTRACTOR SHALL KEEP ALL EQUIPMENT. MA ERNS. VEHICLES, / / /' // I I [• / I /' f I f g 1 1 CONSWUCIION TIWIERS. ETQ WITHIN SIZE UMIR. B 5. CONTRACTOR IS RESPONSIBLE FOR SECURING, PROVIDING, MAINTAINING AND gy \ p REGIIUTING ALLSAFEIT PROTFCIION fOR OVERHEAD AND BURIED POWER p 4\ 1 6. COMRACTORSH.LLLCIFMLYRHIRFYTFMPOMRTREROUTNGOFALL r O \ \` \\\` \`\` `\ @ I i II MM¢ SING STAKES. "a. ETC M i \ I. WHEN CONNKTINGtO ALL EXbiNG MMES. COOROINAIE ALL WORKMA 3�+ \\ \\ \ `�� `��_ ` 'r\ \`\ 1 i me III \ 1 '� \I °I \ \/^ /1� I \\, I SEE SHEET C0.02 COMPLY WITH ME APPROPRIATE GOVERNING AUMC)l. p¢b \ \ ; N-I - \; �� V \ \\ 4 1 I {° I - FOR TREE B. CODRDINATE AU WORK OUTSIDE THE PROPERTY UNE WITH THE CUY. Y� \ \ \ \ \ \ � `i \ WETLAND I iR $ 1 I I 9. CONRACFOR.LLREMOVEANYEXIRASOILFROMSBE .4. \ \\ ��``��,_•\ _ _-��\\\ (MANAGE 2) \ � LPL REMOVAL PLAN la NSI ALL PIPING WITH LESS MAN 6 FEET Of COMM. AS SHOWN INCML �b��e DEEMS. G� \ •' " \ ^ a II IT. AT LEAST Q HOURS PRIOR TO CONSTRUCTION ACTIVITY N ME AREA OF THIS `[ \` �\ \ \ \ \ \ _1 1 I PROJECT, ME CONTRACTOR SHALL VERIFY ME EXACT LOCATION AND DEPTH �� ' \\,�M01 `<1 N I I OF ANY MM¢WIM ME APPROPRIATE COMPANY.IIX'.\TIONS AND t < `\`` \`l ``\� <T \ \ \ \ •' `` <Wl' I - INFORMATION CAN BE OBTAINED BY CALLNG GOPHER STAR ONE CALL AT ES yyI g 12 ME RELOCATION UTILITIESMUSTBE �GlW� o g\ \ \ I \\\ \ \ \ \/=II I\ I I COORDINATED BY ME CONTUCTOR.NO ADDITIONQ COMPENSAIH)N WILL lin i \ 1 1• �\ \ Y<sQ I ) BE ALLOWED FOR EMRA THE AND EFFORT OR PROVISIONS NECESSARY TO I \ \ 1 1 II Ilk 1\ \ \� \\\\r '- O0 r �%' I /I WORK AROUND OR UNDER wNTMM¢. \ RENM WIR9\ \ \ I I I l \ '• 'm (° IS. ALL EROSION CONTROL DEVIC¢ANDSITE MLUATON FENCES MUST BE \ / I 1 / `1 \ \ \° ° o q.^I, / _`V INSTALLED PRIOR TO THE START OF CONSTRUCTION. � 'PENCE M. CONTRACTOR LS RESPONSIBLE FOR PROTECTING AND MAINTAINING am \ ,`� '_ - 1 V ' 'I �I Ili I I IXCAVATIONS. REMOVAL AND OF CONCRETE WALK S. KS. CUM.\q9 \\ {\_` \ d' �Q� BASE MATERIAL AND BTNMINOUS, EC. SHALL BE CONSIDERED INCIDENTAL /'/ 15. REMOVE AND REPUCE ALL EXISTING STORM WATER PIPING ENCOUNTERED / _ _--y-.0 ` . OFA I It WRING IXCAVATION. it \\ ✓ / / / / RI310YE QUVI \ ` -' I ��' \® �'\ //` I I I T6. CARE MUST BE TAKEN WRING CONSTRUCTION AND IXCAVAMM TO PREFECT \ \ R@KBVE LIGIJF P/ELcp i' L=FENIf `s \\\-_-__�>-'s C. \ 44"\_ `\ JY - I I 1 ANT SURVEY MONUMENTS AND/OR PROPERTY IRONS. \ ___�___i\ \ ,;\ // /JIyK1 t�l - 1>. REMOVE BURIED RUBBLECONSIRUCTION DEBR6 AND MSC. HUE MATEWAL V / / \`i i� ___--- \ 9 •' jl / ]{I I\ II' LrJI EICOUNTEREDDURING IXGVATON. VERIFY W/NQGRORING \ \\ /'/ RETI�15/E RQAV1RICs WAl1�- \ \\ I • Iy 1 `\ '®� O Ifl UNLESS NOIFU OMERWGE A111REES. STRUCNR¢.AND FB1C651HWID BE PROPERTY OWNER ON _ / / / i / \ \ m ® \ \ 114■■ I I 1 I PROTECTED. Z / \ 1 tA� / /' I \ \0 I J / / I I 19. CONCRETE INFRASTRUCTURE WIIIIIN THE PUBLIC RIGHT Of WAY.OR ANY c REMOVAL OF WIRE / / / \' 'I B\ // / ° C1 \ ' �� //i•I{3/ / / III L>I CONCRETE DAMAGED WRING CONSTRUCTION. MUST BE REMOVED AND U C FENS / �?�- 'REMOVE POSTS&ANr---\ I �j` I; 1 I ` l \ \ - I [ g �II °B"'CF°. J Z B ° 9 tall(ovMGLngfs. I\ \ j FOOTINGS / / / DIVERUIDING & I I % 1 ° ✓ 1 III LION H / / / / tNDAnON A •/ I I II�� Q REMOVEMOUSEB \ 1 \I / I/ o al 111 1, J I = /" i FOUNDATION 'mt!Im \\ i /G � / I `� I IPit 'I { ��/ I 11 III i ii: LEGEND p Q OI / \\ ���/'''fff !REMOVE HOUSE fi9 I I 'll ;I \I cM9NIi�FD II III OI v ' FOUNDATION I I.1 1 \ T I I RROPERTYLINE REMOVE CHAIN LINK [ / / / / /Y" 1I WAv 1 P \ —}' / / 61 1'1\ 4" l\ \ 1 I ! I I : RIGHT-OF-WAY 2 c FQHIf _ I \ \ \\ / / Y 1 1 \ ; \� ?� o � \ \\ I 1 1 LOY LINE W Q W :� / \ IS // @I.I \' \ ,\ ` \ \\\ \I71 V �I ________--- CK CURB "GETTER C K I I• li`I \ Q d \ III 4 <— —<— EX. SANITARY SEWrn C > unK / / I 6, \ \ =.. \ /rl C) —« « Ex. STORM SEWER Lu co') 1 T�i E1 1 I � \\ \\-.���JI// I I —L_ I— IX. WATER MAIN O W �T�7 T_/9-Fi ,T]� 1\ I \ �\�ti \ \ //'}<� 1 I fe BuaeD ws MAIN \ II \\ e gIIC II /®/% j/i/ d\ A _ \il / ♦ ! 1 NWI `� OEIX i1' JI FI - I\, \ \ \ \\ \\ 11 \/1i L1!� _° / LETMwNG/ am\ l 11 I I �YII , YI I EB ABURIED L uEnLELRFnREsC Vl_ CHIP I rn-BCABLE TEEVISION MR181 REMOVE E' 11?1 m° �\\\`\\ \\` I` 1 j \-'WI(do r��?r Y9 I BOILLARO ROAD SIGN PARKING M PARKINGETER MAILBOX REMOVE HIJUSE 91 1� ReMovE. YFk`\ \ \I I @�pVE (iU11EL 1 1 (���` I`� I �1 PnON SIGN LIGHTPOLE FaIIN,Ir��T,,.I \ ELt POWER BOX '....1""'. Y \\ \� i Y- - - `\ \ \ _ _ _' • R 1 ``� `\ .i I T�ARr TRANSFORMER J/ I !@- _/`\ 1 \ \� \ eF \ \ \ \ I ( . p 11 J .mT WLVERT TELEPHONE BOX / I I\11IS Ii I CO7 IWHD HOLE 4R- LIGHT POLE NO 1 REVISION 6 DAT E / DOWELBOX BITUNENDUsAREA HOUSEIAD COt0ETE MSUBMrtFALTELEPHONE BOX C M[IAINING SFOIRMTWN$m ° / / I o J �I_- I POWI3L POLE WAS- I r/_''I I / Y\ / 1 i Ik 1 i I 1 -.'i ° I t,°B 31f+ I 1 - •I I,aIL 9T/' / \GI�I I I I \ e ♦ ,°\ j I : RMF-umsFss / TQ�}}//}��6h. PATH TO I . 0 _ I r fl � � �' IMINR30 1 Ex$NFA'MB-A�I.�I�<�\�F hvnu "AIR waA " I 1 L.nT.L L.vt.I h.unv l+'O �— "'b aAWN MY RUE — s9e� T___. �_i L_` i___�IY�--�_\ Inn i —- - - - - -yf-`�.\ _ __---- I _ _ C0.01 TOTAL NETW 35199E SF WEI w 329MSSF Nfl SNFFC.CN1gNOWE w 318,MSE TOTALCANOPYMN (F ftSj M.W7 SF fob -.H mg 9 _ tq. A TNEE�PNOTECTION DUML.TYi w. 1+ 12 CO.02 :a mi Ta Numbs Di SPECIES CONDI110N Camment CAD Coda Mira pDOP M_HpOp M Removed? TaLHombn pOFI Ed.E5 CONDOOM C¢mmnt Cak FO_C -'PDOMgRY p H R 123. 18.O.6- G. RED 3$ 2.$ 1241 WX M¢I4r pm 3tn RED 5.9 38 1395 ar IlO Mapk )u9ar CW TRED 30 .2 2Z.0 WaNed M, Bl Gootl RED 93 5.7 l3% 1O.p Greco Poor MID 2] U. 1,. PaelOn RED 53 0.3 139] 13 D... RSd Cutl RED 3.2 liaa 3].p OY Retl C. )RED 3D ]J 13% 130 wanoL. Gi RED 25 I. Sri C. C. ile )REC 21 LO 1. 130 WalialiS N<Y Good RED 39 I. ... I. GmE tloe r TREC 2J L] ir ]ad1 15.0 RED 19 ua) sarrva I. Sprr[e LON Nw 1gEc sA u R 1mI dromalrya• PrESSmor voor RED $9 I2. 1. 5pua Goad blue 1RFC 25 lA Im2 nI. 2304Ur 6eem GOW RED 3A 13s3 ]BA Sprott GCN lorry TREC 3.9 15 0. lm3 220. Greco Gaut RED 3A • I30 Boor Merlin Gm1 Ta . a5 3.9 R lma !80 BaaeMee :81111 (x] RED lJ I 12% 121 Warm, Rktl GSM 3Wnts .0 37 2.7 R 1. GeM RED 3.) ]255 SID Mapk Sihr Poor 'minor RED 29 2.3 R Ial3 Is Bo¢km Caw TRED 3.1 r 12% 100 A.elde• Goad TRED 32 LS lal2 Am Gme 250 AA Green Pm• 1 IAEO .11FEE $S • us] 1000omger Pm, 3Wrb 1REO 21 La R 1all 190 55 ]2% 110 WInuL Bled Goctl RED 34 lA 1a1a ]5o 4sn Green Arh Grtt vau 1RE1 29 • 1259 120 Walml Rad Parr RED 41 1.] R 1a14 16.0 pox TRED 29 21 1]CA 360 WaInu101ed Gi TEED 33 1.6 lal6 16.O Bo¢Itler faro 1RE0 3.5 r 1261 IlO Wanu[Blad Far WEO ]] 2.0 R 1415 11.O BE: er Fan WEO • 1262 11.0 Sri Gi MEO 65 2.0 p 1410 IO.0 Boredr Good RED zJ • 1Z63 1]O Arm creep Pao, WED SA 2.] ft lal9 3].0 Borelner GeN lA2O 2.] • 1360 160 Tree gM1m Far hurt od RED 6.fi 2.] p 1d30 IJO Wdb<rry Cpni WED 3.0 r I365 11p Bmeltler fair WFO 36 Lfi R 1a21 $$A Si Sopr CmJ RED 30 r 12:6 1' ASM1 Grem Good RED 0.0 IE p 342E 1a00ai WM TRED 1.6 r 1267 1SD So. de, poor RED 3.2 1.6 R )In 240 Mapk Sugar Fai, WED 37 r 1271 14.0 Bmelder Pcar WED EE. 43 p 1a24 200 Elm Am- C.od RED 1A R 1321 ILO Pwr WED 1] 1.7 A 1N5 $30 Art Green GpW RED 0.5 R 1323 Sm¢Me• 18.O de: Poor To lJ 19 fl I'm I,. SoreMn Good TRED 19 R ]3$$ SLO Bo¢Ider Sam. pm WED 3A L] p 1m1 2O.O Mapk Lyr GOW WEO 3.1 R 1323 32.O 0aaelder Pm• ToD 2 IA p 1IM 13.O Botrem. Gard Wf0 5.1 R 1324 2600a¢Ider Poor WEO I9 L] p Im9 330 Tree 0M Gi white on TRED 2B R 13z5 ll.O BaaeIM• fYr WED 5.I 33 p Iam 19.O Walnu[. Bla[k fNav' RED 3.2 R 1. 210 M¢Mer Good ME 0 IS LS r IMl 120 %aali mJ WEO 2.s • In 3)O Harmer fair arm. pqn WED 16 v lY3 11001mNv CCM WED 6.] r 1328 13.0 Tree OMer Good WF0 21 13 r 1.2 dt0 bredu prom WED aJ ]339 16.O Fite Otbn Cutl wFtle ppb, WfO L] 1-7 1. SLO N¢me, Far, MEO 3A 13. nOOaxinmJ Fri IAEO 2g IJ 1Y5 ]60 Bo•eLler Pop WED 30 1331 12.O=11i fao TAED $9 1.5 lad6 300 AN G- Good WED It .2 23.O Tree Do" Lea WO-E WED 33 2J • 1. 1BD.a . Gnol RED 53 1533 110 Boaelde, Poor RED 47 ss 1. a10 Tree aher Good of WED 3.p r 1. 1. EIm Amami Gml WED 29 L) 1. 13A wa0wC dark G. WED 36 ]3)S mA T-OMo Fao patar RED 3J 19 1.. 1. Si Pro" ai WEC 42 131. 30D T-OrM CCN F. pplar WED Rp 37 I451 1100orelder Good WED SJ r 1337 130 WaImrt.1i fan TIED ;J 15 U52 I3A Dana a Goa 1RFC 29 1338 120 Willow Fair RED )3 25 laS3 n0 aN Greco Far RED 41 1. 120 E3m Amed GeN RED 3.1 I. 160 Maple Sugar Fair RED 2R lam 1.0 CedaF RN Cqa TaC 21 29 IJ ]a55 Mapk Sye• Poor WED 3.2 13a1 Cedar. Rad War REC /A I.J 1a,, 19.0 Goa WED 3.8 134E I00 Cetla,, Retl I.,. Goa REC 2.9 IB 1a5) 2300S.I.Sue War pm WED 59 1343 uA asp Green Gootl WED 29 13 1458 ISO SAFr Zia Sugar Pop TRED 3A 1.5 ]0.0 Cetlar. Red Goa TREC 23 I3 ]d59 110 3LO MpleSgar Pi TRED 23 3395 ]00 Cetlar,ga Gaa WEc L9 ].3 1m0 3RO Mamide, r Fair RED 30 r 33a6 ]3.0 Cebar, fletl Goa TREC 29 1.6 102 Iao do¢Mo Fair WED 3a r 3%] Cedar Ra Good WFC 3$ 1.3 140 Tree Goa TRED a.I • 33aB 10,0 ]0.0 Cetle,. Pa Goa REC 21 2.9 lJ r 1. IOrmarmam 150TremIma Omar GOW amewplm white poplar RED r 13a9 13A cedar Ra rood REC 63 29 T,u.1 Gaa 2.6 1351 ISA Cedar Pa Ed Goptl REC 5.9 2) E.S lms .1. T-.1 Go. Wime xipoplar RED pwa, RED 3D 30 ]352 12A Cedar.fla Gaa REC I.. 1M6 19A OMer .0 Good Earme Mne ppar RED 50 r 135E 140 Cedar, pa Gaa TpEC 4D 0.0 24 • 1afi] Ce 120 CeMr Pa Gaol REC 29 1353 120 Cedar,pa Laa REC 3.5 23 lm8 11A CeNr.Ra C. REC 3.0 r 135a 23A [edar,Pa GaW M. z.9 lA 1.9 110 Cetlar Ra G. TREC 31 1355 lA0 Caaq RW Bird REC 33 2.3 1470 Q.0 irae OMer Pw, white wpar RED 3.] 1356 M 160 Ford G<N TgfC $y $) , 1171 L.O i¢e Other Good wM1rte pplsr RED 3.0 335] WWr, 2000aY 0.M Gw♦1 RED 33 1J .,1 210 Troo tare, Grad 'Mite popar RED 35 I III I40 Bo¢ldo fqa RfD 2) 19 la]3 U. Otl WM1ne Good ROD 3A 3359 150 Sam". dad Cwa RED 3D IJ 1.. 2110 Tree Other Goa WitwS RED 69 r 13(A SO.I Aq G¢m fao 3tlwb RED JA 3A laR 1).O Wali Eli Fao .Paid ben REO 3A 1362 12.0 Adt Greco RED 3I 2A la)6 210 Time Cater G. Wnoak RED 33 • 1363 130A Green FwGoo RED IJ L$ • 1477 13.0 Tram ratter Goa Soi RED I9 • 1363 150 Ad, G- Goo Catl 3A L6 r 1a7B I60 am Gl- CrcW RED 3.s 1360 1I. bn Green Gna RED TpiD iJ 1J MR IAD Sum G•em Good RED 3J 1)61 II'D ad=man wr RE0 22 19 1180 U0 L5t G.em Good ME I.3 1)66 zla wamr, Bah GwM Ma,wY ME 3z 13 a 1al 22.0 Bar¢ ee. Pm RED 3A I1133.fJ, a 1400 Cod TR0 22 lux] m0 c<i.ee REc 23 •rr 1 ¢d Gad ME. 34 22 183 Dal 2 RED 2Ma 139 IS Fair R 5.6 20r • 230 orelder Good RED 259 r 13J0 16.0 Sorel Fair R D 1My g5 O4me,n EIm: Goa RFD 3.9 ISO Bo¢ Pm RED I l.I 18 lA men GM RED 271311 72 12.0 kM1 Greem RED 21 L3 1m 130 SE, Firm REC 2D 4 1OBwedn Fa RED 1 jU 14.O WaBl-1 Gi RED 6 1374 $sldoor RED 499 iL¢Idn RFO 25.7r • 1n5 15.O Bonitler Pca RED s.6 a.8 • 3a90 130 Cri RM Goa REC 2.] r 13J6 16.0 kh Grnn Goa RED 3) 2.) , 1411 120 Sp- Poor wNle TREC 3.I ]rn l2.O Boai Good RED 19 18 • 149i 110 Char PM Goad TREC I., 111. 1,D Will Gram poor RED 42 19 r 1493 19A Da, F. Good TRED 34 ]3]9 110 kh Gmen Fair RED 12 20 14. 16.0".."do. Goad TRED 3.) • ].0 I'D Wamd. IHSOS G0M Rf0 30 2.1 1411 140 CeMr Pa Goa TREC 6.] 1N] 170 kb Green Good RED 3D 1.3 1a9S SOO kh=m Good RED 3A 1M3 1]A ENn Good RED 30 13 lm] SL9 Bustler Fao RED 31 130 ash Gram Poor dWnka RED 33 L6 14" 11.0 A0a Good RED a5 r ]YS E. EOO kt Green Imam Goa iPEO 33 I3 Im9 G- nO adh Green Good 56 • IMP 1,1 doaehaer varc RED 30 lI ESCO 1ED kb=ear Gwtl ME RED 39 r 3396 ESA WIIr1uC Bad Goa RED 3.9 IS 1%s ss.p wamw,MwY cane RED 31 I. 12.O kM1 Grten Gnod RED 2J L6 I%6 S10W "i Bah Cmf RED 51 r I. 1II kh Wem fo<a RED 29 L6 • !%] 110 walnut Barb CCN Rip 13 ]%9 15.p.. Good RED 3.5 I3 • I95d 10.O Em"do Grce RED39 ]ISO 170..G- Gap ED RED 2J L 1959 1100o¢Idtt fad RED 3) 1393 18.OF Cara ME 23 L3 I960 35.O doaeda pow $barb Rip 29 r 139E 160 WeIM, Ei find lgfD 13 $.1 1%3 1).O BweNtt faa RED 33 r 339I 330 Waim.BM Im RED l5J nl !%$ 110 Bweldw MaRED 53 r 1394 1a.O ESP Pmeroan Cwe RED 37 La • !%3 13.O Boeldtt pow RED 1.9 I. MO kt Greco Gttq RED 59 • 1%S 160 kt. Good RED 42 Rami Ta ImanW R DOH SPECIES CONMION Gmmm1 CAO_Coh LW_PDCP Lln_HNR IDS Mh Gren Fav xbuM RED 35 ]3 17.O WiNara Par, TROD 3J ]A 1..0... Fair RED 33 u is 0 Am Grten Fab RED 3A lJ 130 W.".. Bbd Fair ME. A] 33 IS.o Elm Pnrmrim Fw RED 39 L] LED WalmE Eby hb RED 33 Ed 160 bM1 Green Good TEED 39 19 M. dirdi.ad Good ]RFD 3D L6 16.0 W ImEm CaL RED 3A L3 1$.O TrF Green fix 1US ]J 70 .0Wa RM fair ROD 6.1 33 Green Cntl RED L6 Z045h 0 Av . Gmd 1RE0 30 11 IED mveMn 11: TRED 16 13 1EA Gaakr ME 1.] 13 ILO M.eIM ME 1.2 11 1600aaeldv Far WED 2.6 13 .1 do: Poor WED 39 13 1LO.... poor TRED 39 1a Z I.O Welnu[BIM Far WED 3.0 15 111 Immi Fair 3trumb FRED 18 la 11.O aah Green fair FRFD 3a IS SOD Wan a101ad Fa, WED za 13 110 W:'_ dark Cx1 WVD 337 In,0 12. aah Green ii WED 39 L9 I E 0 bh Green Good T.D 1 21 II W.Iidda4 Gmi WED 29 L6 52D Wilow Fav vleegry WEO 39 LS IE.O BoaeHn Fav WED 4.5 z6 ILD Forode Fat WED x3 13 Ilp Boaedar Fat RED zJ LS I600medaa Fw WED xJ 13 100 Noudv Pi WED 16 13 13.0 MrtYM Gxd WED ..1 L] 11 D.... it RED 4I L3 ISO Rm oki Rn RED 69 IJ ISA Poeede Elm RED ED ad L3 100 Bo ¢dn Good RED 59 3J n0 txe tt Pmr MFD 3J Lx 111... Gnd RED ]J L] IaO Mader iau TR ED 2] 15 ]606aedn fair RED 3.3 E9 lad ee¢der For RED 1506reWm inr WED aJ 14 1I. Pnremee fan WED 3A Id.O Pm RED 16 17 . ppop RED EI12.0O=el.d1 L1.] RED L6 l.D t ;00%d For W a3 21 11bd fan REp D 2.9 13 13.0 B0¢Idm Fan WED xs EI la 0 6 ¢Ida fah RED 1.. 13 300 Forri P- ME. 3A I.I Green Poor RED .,I x.l ,zd. l3 a 9a¢dx RED 3.7 17 11.09aaeder WED E.9 2A 10.0 b.eder ME I 16 16.0 Bo¢Itler Good RED 23 1.2 1208.eWer Pm, ME 2] IS IIO C.ammicn G. WED :s ss 150 Am Orbry Goa RED SJ 51 lad Sme, QwYYp 1. WEp 3A 18 ;ED lupin. Pubd Lad REDz3 IS Il.O eapm, Carl Good WED 2) Ib 1306oadn Fan RED 23 L] UD or. Gmd RED ss 19 IL m.tld., Good RED x3 La II.O Mader For WED 25 IA ;sI mrelem Poo RED I.9 Ll I.D Sam. Mark toa WED 2.5 I6 101 W.mac Mary Far RED 3.7 x3 120 Sam. .1 4wd RED 3.7 23 19.O ".mi ddd Gootl RED 2.9 IS 1609oeNder pm RFD ].6 1A 111 Sm er Pm WEO 29 lJ 1909omorm Pm 2WnW RED 39 zJ 190 Wh Green Gna RED lA Ll 130 Aet Green 6wd RED z.2 1.3 190 aN Greco Goa RED x.] IJ 12.0 AN G= I. RED 7.1 33 19.0 W Grem Good RED I.I L9 Error m RED1909ordi z.e L] 16. 0 I'mAmerican Good WED 11 33 1309oeeldo fair RED 6.3 3J 1309ori Good RED z.9 ].1 21.0 as,Greco Good RED 36 ]3 3t O OEES., Pmr RED IJ IS 13.I 91¢Idn fa ED RED z.] 2D 1J.O kh Gram Far RED x.9 IJ 1JI Fri Gaa RED 10 IJ 14.I 9n.elder parr RED I3 21 120 0malder Pm RED 73 2A 110 9o.Nda Farr REDSA 19 15.0 M¢dn Far RED a3 la O.,am is WED 3.6 L] 13.D M.eder Pm ]RED 50 U 16.0 b¢der Good RED 3.I LT 1LO So= Cuod TRED 43 lJ 160 Mader a RODGoOD 3A 11 130 Mader Good RED 30 1.6 l9A Mtedtt food WED 29 lA ;SA &M1ramut fan RED 49 24 ,I D kh Oman Goa RED 36 x3 t1A AN Greco 4wd TU 1-6Lx 110 So, Grnn Gad RED 13 29 24.O CnOtwwood Good 2mmai WFO 17 ES ILO War Gaon Fan WED 29 1J x90 W"i Bhh Goa RED 32 xA 24.0 Ath Gwen Farr zWok RFD 17 u 12m D DAIS 3 ICR SIIBMDTAE 3 OMWN R1R3M C64EW FIVE aldi. 19100412 C0.03 ZONING - SETBACKS THE PROPOSED ZONING FOR THIS PARCEL IS'RSF' SINGLE FAMILY j RESIDENTIAL ZONING MINIMUM LOT SIZE = 15,000 SQ. FT, FRONT SETBACK = 30 FEET REAR SETBACK = 30 FEET SIDE SETBACK = 10 FEET MINIMUM LOT WIDTH = 90 FEET MINIMUM LOT WIDTH FOR NECK OR FLAG LOTS = 100 FEET MEASURED AT FRONT BUILDING SETBACK LINE. MINIMUM LOT DEPTH = 125 FEET MINIMUM RIGHT OF WAY WIDTH - 60 FEET VARIANCE REQUESTED LOTS: LOT 5, LOT 8, & LOT 9 STREET LIGHT 20' TRAIL, UTILITY & DRAINAGE EASEMENT T OINCRETE TRAR %L /I I 8g / I 81,556 SF / I 'Taos sF L L G _m - 15,956 SF •+aue sE R — LG ➢I &' I 5 SF I W L r 1 6 S R SURMOUNT18,254 SF ABLE CURB \ & GUTTER , i G ' L__ NBT72'ZO1V I .mAr Era DEVELOPMENT DATA GROSS PROPERTY 390,563 S AREA EXISTING R.Q.W. 38,687 SF (ROW. d We Wry Rwa &Yo AW,W� BRn te PNr) PROPOSED R.O•W. 41,629 SF (Law dwgO Sbl -A-) WETLANDS 32,948 SF !<aa waww as soma � awn I e:) WETLAND BUFFER 17,404 SF (Ida wabtl Rdle m mo-en ouuas lez) NET LOTS & 259,895 SF PONDING (Re,M.pq wa dqm peen As aICA9 e PRR*aa 0.QW.n, wNl.,as, Nd wdhMs &ifa) NET DENSITY 259,895 SF / ALLOWANCE 15,000 SF/LOT = 17.33 LOTS NUMBER OF LOTS 18 RIDS (297.DO fee[ deed) SBP12'20-E 285.10 R 10 19,054 SF G A tE II ➢ 27,283 SF i i ➢ II 'RaT95>iF F G II l CITY DPAINNGE ;L_ I VARIANCE REQUIRED LOTS (FLAG LOTS) LOT FRONTAGE I LOT FRONTAGE MIN. LOT WIDTH LDT WmTH MIN LOT AREA LOT NUMBER RAG -FOLF MIN REQ. PROPOSED AT FVSB PROPOSED AT FYSB1� NOT II'IOLDED — — AN 30' BLDG. SETBACK — — 1 0 'I n FROM BUFFER i g' ^' CITY DRAINAGE 25 WETIANO BUFFER Ei g EASEMENT s8R^17'2D'E - x' I 330.76 1 --------------- I I OUTLOT 1 - � 1 33,738 { I I I I I 1 I WETLAND Vx AGz 2. i Yl i ' I I ' I I i I I I I I 0 LOT TYPE & BLDG. PAD SIZE LOT NUMBER TYPE PAD SIZE LOT 1 WO 80'X75' LOT 2 WO 705W LOT 3 wo 701X80' LOT 4 WO WWI - LOT 5 WO 80'x80' LOT 6 LO 70X70' LOT 7 LO 70'I(80' LOT 8 LO 700030' LOT 9 LO MAX LOT 10 WO 70'X70' LOT 11 WO 80'X70' LQT 12 WO 707(80' 11 25' WETLAND BUFFER R ) 30' BLDG. SETBACK 23,314 SF I< FROM BUFFER 12 ;I G ➢ 41,761 SF __ ��! G " LOT 2 WETLAND SOJNCRETE SIDEWALK 416 1 ' OPT. MONUMENT 1 BaAT7lox TO ro aE �®) Ar -_ QTn BEGIN SURMOU ABLE I I 1 B618 O1R� & GUTTER _ / 1 _ -__ _ - - 1 I PEDESTRIAN RAMP \ _ r m `�-- _ I 8618 CURB & GUTTER 18,538 SF f ` ---R I Opr. ENTRY MONUMENT - I 16GP (IDKAnON ro ff OEIERMINED) ji 16,063 SF ,%/ '� S CONCRETE SIDEWALK GP 20,678 SF i I DRAINAGE EASEMENT / ;g°.__ %l G 4- I C"-'-- T I — — — — *PROPOSED LOT PROPOSED LOT AREA, RAG 'POW AREA FLAGPOLE' W NOT INCLUDED INCLDED 4J cF fu 4-J ( *25,795 SF 27,283 SF *15,146 SF 15,956 SF *16,034 SF 18,556 SF AGE Ul UTILITY EASEMENTS AFAR • ^_ o ^ o'� m ._—___T T_____3_____ ; z _ .1. WNG 10 FEET IN MOTH AND AD%NNING STREET RIGHT OF WAY LINES, 5 FEET IN WIDTH AND ADIOINING IDT LINES AND 10 FEET IN WIDTH ON REAR LDT LINES AS SHOWN ON THIS PLAT, UNLESS OTHERWISE DIMENSIONED. LEGEND eaanW. uc -------------------- NOTES L Au owDmaKSAREro RADc of alas. BACKOF CURB R.O.W. LINE 3R RIOIIi SET8110C1INE BUILDING PAD VARIES PER SITE *G L30' REAR SETBAIX LINE J EASEMENT g� 2 INOREVGIDN DATE( I �-DENOTES TYPICAL *G = GRAVITY SEWER DRAINAGE AND *GP = GRINDER PUMP LOTS UTILITY EASEMENTS UNLESS OTHERWISE TYPICAL LOT DETAIL SHOWN ON THE PLAN. Nor TOSr sNRFi N CAANN "" DA® AIH ANNVW Nx PWL wu H. 12 40 D® C1.01 11 f1�ri: rfffXJl � �f � ilrf lfJ�rJ �� Ffd r• - i I !�/ a I �I F' rr�f� �JfJf�JJJr��df��ff ���r x ffix2'rr'rrrl rJi lfrrlfrr-r, f{ rrrrrlYral,frlll�rY'� rri� rr�{iJ- - --•1----- ' ow s.aa s%__ - - _ --__ _ ='I♦♦ - ---- �I OUTLOT 1 WETLAND QRNIADER) --- _ ACREAGE SUMMARY DOSING IMPERVIOUS AREA 0.7 AOLB NEW IMPERVIOUS AREA 3S ACRES TOTAL DISTURBED AREA 6.0 ACRES o I° 1 •aw ' 1 �v, v III_ _ ♦\ \I I I I II I (, LET 2 I lb i l ILi. I tC'o I •� ♦\ I\i \TT) P -- � 0 ---- ; r 1018 IOiB'� �� ;r 1 Tp TB _/ — I ---'%.I. BIOROLL, MINIMAL DISTURBANCE. WEAVE BETWEEN EXISTING TREES. i BTOROLL, MINIMAL DISTURBANCE. WEAVE BETWEEN EXISTING TREES. i I 1 I I I iI I ,I Y Iof I I I I I 'i J I I I �`� I � SNT1M1@I.Il dvw.mi.% I I J L_/lfl -___ - �♦ ♦fib �` Ieu` ' � EROSION AND SEDIMENT CONTROL NOTES: 1. ALL PERMEETEES, CONTRACTORS, AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION RAN AND THE STATE OF MINNESOTA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NOTES PHASE D PERMI) AND BECOME FAMILIAR WITH THEIR CONTENTS AND 15 RESPONSIBLE TO COMPLY WITH ALL REQUIREMENTS STATED WITHIN. 2. THE BMP'5 SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS FOR THE ANTICIPATED SITE CONDITIONS. AS CONSTRICTION PROGRESSES, THE PERMITTEEJODNTRACTOR SHALL ANTICIPATE THAT ADDITIONAL BMPS MAY BE REQUIRED AS SITE CONDITIONS CHANGE AND SHALL PROVIDE ADDITIONAL BMP'S TO MEET APPLICABLE REQUIREMENTS. 3, ALL WORK AND MATERIALS SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS AND SWPPP. ANY DEVIATION FROM THE APPROVED PUNS SHALL REQUIRE WRITTEN APPROVAL FROM THE OWNER. EROSION CONTROL LEGEND MACHINE SLICED SILT FENCE HEAVY DUTY SILT FENCE WIRE BACKED SILT FENCE m SUPER DUTY SILT FENCE BIOROLL ® ROTATION SILT CURTAIN KIOWOD( ROCCLOG RIP RAP ® INLET PROTECTION /� DITCH CHECK- BIOLOG DITCH CHECK -RACK CILVERT / PIPE PROTECTION TEMPORARY SEDIMENT BASIN W/ PIPE DRAIN TEMPORARY SEDIMENT TRAP —X—FJ JJ llamo® DIVERSION AND PIPE DRAIN SANDBAGS CONCENTRATED SURFACE ROW ® CONCRETE WASHOUT HYDROMULCH � �a .�.a a JJJJ1llJ .. o a. e W (L/V� L • t E o (�p g�6 ROF EUS .. 122 N S u o U ,J V Z J 0 Lu E- LL Rn 0 DATE i / x TW 1023 BW1017 TW 1018 / BIN 1015 / o .____ 1S _i__1g$..p--41 TW 1026 BW 1021 p o !n Ot y\ `ram O V �\ 0 / N , I\ \ W I TW 1025 TW 10221 / lot BW 1T19 ee m d w' i,r FGG 021 TLS 1 / RFG 1012.5 I ON II / = ws= 998 9 MFF 10 FGG 1 I A�- n A1FP1p1816 1Oft0 ------------- SlIlD �RIII �\ WETLAND \ \ \ 1 I 1 I i 1dutFGG02109.. i TLS \ 70U 1018 tozo Ai fO/H c m 3020.0 { hiI II 1016 /; i M�101� l' Fl- - � 6NdYN016: ' .- 1. QAY111KIpl9WL V61FYALL 1%LSRN6 LnNOn1IX6 YA]W0161OGTIRd. Rd uro wmr eEvxnoxsaF EaMpG mnurf wos9nrAm sTwcruREs. I 1 uo sTa v Etla ro,c swrtxv uo wATw sT� nP oosruw cnANa. 1 1. E¢YQSE Z11.V1Ad'Bn RKn�(9V51 ro1w0BtE BY!$N.YO I sFD11EMAnT' 0.PING 061RUC(ICw.IH mT1BIG Wn ura BL9x . 1 Rg1EClIGI 10 T� 5®PBIr/�1R11 Oi SIIE OI N MS Q i W VAIF 10 1 STdIM SENF.V SY51@6 a •a"r .. sEE sxEr-_T umre.m wR �TslArmsoErws I a s. swr aarAnars u¢rwwrxE lRooa Ev®®mAoawav�rwsE - I n vniGT®erlwtnax orT�swn. I 0.IlLwfIEVATIQ6ME T1P Cf 1`1VYf tllURl9lWffiNJI® 'I m)¢nvff. way flEYArR6w1E wa;a�®EuvATmro Wvnce - t®11YEL'IUPY[£TOWAIQ15 uld BA506 Ol OIMSTEmN@ILTO0. I stun � RL901®IF ro xmuv rnts AIO w19Y� rle uµlmm IEIFVATIIXK ro WI[MfE WLn1YE OMd.Yi Talgp4RT1E MMNL t➢'. T. ttAa mT wxa Ar Au ittA,nms rNAr am9o1lur9mxr.Gmmsut i r reg wAs MA¢o wNwE rxF FrveWEm MrttwArmmrAnu� OmIwRdG. mad mrswucnax nurnms aR uxwnaRArFo owrtlas wn �- _w� i 9eplme mFrvuxFM orrmmww snr rE�.TxE mNmrnwswu I I i I ItsmAmmawL mTFfl1.�AS N[fL®roFN91RETIWr xo mT muiTNVF -\.� / i j1 ncsnE, wtam mnLow Mnaxvr iummro mnr�TnE wTmF snE. / i I\ 0.roN1RIL11RSIW1MNdrAd FPlY9MMU SEOMEMAnCN LVTCl LEY1CB �I / � I\ 9A�M1S GrfN 8N9N WO1KnQ1. LLT i1�.ER IIMR MVRIGa j \` V \ i / I \\ I vsrrumum ausoasoo aFsrlats�m. ro MInF Em�vcve:rAnax siwl. aEomuR®rrRwar¢rffi.nrromnnarsT�art wwc I I ^✓ I 1. 1 VLIGT®CNT116 pNWpC I A MCN Fl®l9INRT51Wl9E R/®MM1.:I Sl[P[SMIULMWLE I I I Anus ro REFHIr WTIR9C \ \ Y I I, I In.stm. uua uo rum>g uL oalue®ARFwt ISEEE sr1�LGnas). �jNN � I I u. xornr elmm 991muTar n ANr oam®Ax�rnF xmm eFiwffx I I , I` omlwc mromare Axomxomors rrn®wrrE aAxsvnoa uLE \y /I I sir«trAwT elwral roALmT�w3FNrG rnE uuwW¢ r'( I 1, I I I, uwrvr Au unurvmruaa ffwRE caclw[nan Arn.aurLmtrla)aE \ li� , Mt M¢n�B3aR[RcdxwG xat f \\ 1 1P/r �\ I : u.n[oEYeawRVMium $IWIxffi amno6 snF w.nuu mriV®rot1E BA➢dG 91B `M PCQ 6YfPMIBAT EYF0.r tlINfWAY M09Li fEIIS '� I Wnncnaromxmxe�wrluriureaoFarstrEOMoncmort- u-wAr aR dlo irMa xou�Er uEAS TIEmIxww�¢swua _ I uwmn er EWm vela£ rw,r ErlearresnE. I 1.. Em 1II1G VR£rArtON Ctl1DIMG rR@ RW1551W1 E NIP3.VYFD W161EYFx ro4RE ' 35. ERQSIpI mxIR.IOP'IB 9MllEPBH,I®d1EDI1RY.YlFA Gp1 MINFNL.Wx 6tLLY pR(IXG FNDOII'.£O RPIQISGR.VXiML. Il1Y REQIIW® I PfA.VRS MIWQI WA"IPKYQ KiM1I65HVL BE QYgF1®8I 11E , I axmAcrw dxmurar. 16.5[9dEM CEF(bIR SKND �REMTaHI IFrL1I FAW SIpd EYBlI. nEY 5Wl1 / L� I ff RETXNE➢ wrtx outs Rum ARRWam.ARr oxFrtm�oa r1[ �atmr I of TnE sEndRr awRmL v. TxFmMucroRvwL.etovE em9u mwwLOLaaa wnwrrn xAYE / � I sEmm rnaR grin MJRRa{art x0l RaRET[IAsaRAUA xAs / /9 gERMMFxnv5T.�1�ror1EFY1BRrYAr.dnE@YUg1GlHE •9A9•L�rl 'Lf•L0.E1 ^ESf 131GINEEkFAQS[IMIMq sFORIFl1IAT10N /AE UXUR6rro0RVL / / I 10. n1F QI11RALT00.511ALL CmQUlE N1 AVFA fdI nlE WA9R1G OF 2lgIElE / i I TRIg3, TIWT oafs xm euuv rxFwAsrt mxmFTerocanrAnmFson Ib ryurunartmxruxnFNO. I :d � I I� Is.rwuRe oFrre aWrwnrxrolrnwRM wrm rxF AewFlxNr xFsuTu I 66 I li $roRRACE OF wVIL rXF VMWLICA 9WL69PCir ANY NmSNiCPMw6 I I I I I I I� wuu, aonERrmY®errt9 mcd®l wmm1An w.w rFuoo av I ILA xonFtuTml won TxE E�xEu rAnuRt er TI(atxTRAnvR ro onREE- 111E I .I FAmwau As nm�Grm swLAuvvrr9 FlGIxEEAr(1CNxw mxwALTaRrosTaR urr ANO Auwux9nmumrANo rArE Axrrrnox `\ I\I rc�.vRrroaxua wo wawc Au aAns, msr, Lassa, Aro oAwYns \\ I I I� � ReArmmricmxlaAnoR FAnnwro RwwRM (Rs oerwnv®er r�N `i I I �ff�a��rnmxvn I I sra�s�mmvm ITC' / � : ai WLimr93orAmwnv¢naLAiRA1Q oloismr ova waa,Aro IBR.EAT1x6IRISTffNYI➢N1D. i _\____ I , 1 \ rl. Ausrv«awarsms99u �ut�w+uRAaawaro oErAus. /O/� I aoaxwAnwMlsTmMAcrwuoe.EArrR a1T6p9NWS50L MN Rmlffnmc I I � � ®rmRtart Ar ss-mausru rusmar uourvnr ul9E[.rns Y. I sw mAo9c Hole: tT-Ri9 }'� I 1 I t. rxF mxtunwa �TuuvGinv®rwtTr�ittwrwx waDR 9£YATpN 6FMSfIXG lIrnII�A551.TMI pI 11�fIN6aRA�ON t95i � � - RRLRCS aE rxE vuuousumtmmwlaEc xo wlelEl�E fd%1 I,Ew9wFrFxrs rwaNdrt9 wsn. r�9rasuTUHaxorroffRanm aN i I I AS BANG EWLT gI(LMw1rE TIE�IIRALIORSI9LLYHa'YnE FIDD \ I Inunox uAU Rt10.3C ANDrwArEurnn�rmLromwTwcrrox. rnF \�``; oft I mwwicrw suumrtrcr mwelsrArEarEuuAr(ssll waom. rt I 9nuacTrE Re�+rrffrle mtwrnaroRmaTFAU Fmrvw Toi 0 j l �.� t I i I urnrr�wwmoanarwmlrlEnaa®9wove9ftrssnwxwrL� : FISSTNGWKE 4.1101RtN19NN591OM1 AT:iOOr P119NN5. I W1G�GRxdf 6NlgR]M19NNSSIO9N nTi WOrlM9lvu5. 11 J I 4. .. mxwxTaR 9WLLAOUSrA1H,TIldlft?Er9lG wvwartAs xE�AHrro ASw9EA9xWMwrA1001f9HO1Rti1ME, I �/ 5. LGRRKTGl9MlLA4L1f NL4IlYE9M19M;E AWAY fpM 9NDIXCd RAALL I I - NRTURN INO MY®NSAS. IOIQAMRC PIw11NTId TA191 ROM AlLq'IWAIIC wRVEY pY IAM F%a11MG 1WOGRMIYAs 51gWN , �,ALtt I I I 9RVEYCnS. IF (LXfRIGIOR OLB xOT AC®r OX rHE gAIIS. WInWfE1S011M. HE 94111NVE lNOF ATH6 ERf@4E.♦ rOR)L wI(vEY 9YAP£G6IEAro W1O wRYETCAAro 91B4iroT1E Rpr t �� I I vxran FM RaL RenEw. ' g - SW Rblml.il r. Aa9<Ir EuvAnars AREronmw uxE u9rs ornEnwff lm®. *I I ; CN E.EOOl.9R ID o dL'w- tm,.96 � wmraEob FGG 900.0 waxrc.w.�aFVAT >`�- _ - WO MOIffT'IRE: FiULBA93Blr Imlmcart. wo-WAuurt \ 1 ` MFF 901.6a rERpI m09®gpOR aEwtwx N y ?• GH- TiS892.0 r9Ror10Wa9,saert _ 8FG 891.5 FdWt I gw� OR ICV- OHM 2 U J J N Z C) J O W H LU w En O p DATE ® L� 0 40 BO rROA//r.++o..�� 1. 12 W ® .Ul NOTE: I Lars 2-4SERVICE LATERAL 'MOT BE ABLE TO SERVICE BASEMENT BUILDER TO PROVIDE A GRINDER POMP FOR BASEMENT LEVEL AND TO INSULATE SERVICE LATERAL AS NECESSARY FROM CONNECTION POINT TO HOME. SYSTEM IS DESIGNED TO PROVIDE GRAVITY SEWER TO THE MAN FLOOR LIVING AREAS. II �I it 9 I I I I L I 8 I 1 SMH 4- RIM=1019.58 INV (S)=1011.06 T I 6 i I \ SMH 3 RIM=1017.96 IMV (SW)=1010.36 INV (N)=1010.46 0 I 10 I SIRE HYDRANT WITH / RE 7EE AND 6" -�[G}/A,TE VALVE OUTLOT 1 // TYPICAL I, -,- WATER SERVICE 3 I A rC____ uWsna L. WETLAND (MANAGE 2) i I I I 11 P 111 H I - r I j I P 12 '. ,295-r PVC e 0.4% , OT 2 II \ -- � " WATERMIIIN I (�_-- I li ti WETLAND I( I %0g f �. in -i CDNNECTT0 ' OMMNG WATERMAIN "pw I SMH 2 I IRIM=1015.20 INV (SE)=1009.08 INV (NW)=1009.18 I I 100' -8" PVC SITE UTILITY NOTES: 1. ALL FILL MATERIAL IS TO BE IN PLACE, AND COMPACTED BEFORE INSTALLATION OF PROPOSED UTILITIES. 2. CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITIES INSPECTORS 72 HOURS BEFORE CONNECTING TO ANY EXISTING LINE. 3. MINIMUM TRENCH WIDTH SHALL BE 2 FEET. 4. ALL LEERMES SHOULD BE KEPT TEN (1() MINT (PARALLEL) OR WHEN CROSSING 18' VERTICAL CLEARANCE (OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE). 5. CONTRACTOR SHALL MAINTAIN A MINIMUM OF B-0' OOVER ON AL WATERLINES. 6. IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATERLINES, SANITARY LINES, STORM LINES AND CAS LINES (EXISTING AND PROPOSED), THE SANITARY LINE MALL BE DUCTILE IRON PIPE WITH MECHANICAL ]MARS AT LEAST 30 FEET ON BOTH SIDES OF CROSSING, THE WATERLINE SHAD. HAVE MECHANICAL JOINTS WITH APPROPRIATE THRUST BLOCKING AS REQUIRED TO PROVIDE MINIMUM OF 18" CLEARANCE. MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AW WA C150) (CLASS 50). 7. LINES UNDERGROUND SHALL BE INSTATED, INSPECTED AND APPROVED BEFORE BAOTILLING. B. TOPS OF EXISTING MANHOLES SHALL BE RAISED AS NECESSARY TO BE RUSH WITH PROPOSED PAVEMENT ELEVATIONS. 9. ALL CONCRETE FOR ENCASEMENTS SOUL HAVE A MINIMUM 28 DAY COMPRESSION STRENGTH AT 300E P.S.I. 10. DRAWINGS DO NOT PURPORT TO SHOW ALL EXISTING UTILITIES. 11. EXSTING UTILITIES SHALL BE VERIFIED IN FIR n PRIOR TO INSTALLATION OF ANY NEW LINES. 12. REFER TO INTERIOR PLUMBING DRAWINGS FOR TIE IN OF ALL UTILITIES. 13. CONTRACTOR IS RESPONSIBLE FOR COMPLYING TO THE SPECIFICATIONS OF THE LOCAL AUTHORITIES (CITY OF MINNEAPO IS) WITH REGARDS TO MATERIALS AND INSTALLATION OF THE WATER AND SEWER LINES. 14. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE MANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN INFIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY THE FIELD LOCATION OF ALL PUBLIC AND PRIVATE UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CAL AT (651) 454-0002 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE MANS. 15. ALL NECESSARY INSPECTIONS ANO/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL CONNECTION OF SERVICE 16. CONTRACTOR STALL COORDINATE WITH ALL UTILITY COMPARES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS, 17. REFER TO ELECTRICAL MANS FOR SITE LIGHTING ELECTRICAL MAN. 18. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, INCLUDING BUT NOT LIMITED TO, ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS & POLES, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUOIORITIES SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. PROPOSED UTILITY LINES -Nn-Hn-N1- FORCE MAN ->->->->- SANITARY SEWER -s-s�-s�-s-.-a-s- SANITARY SERVICE - - - - - - - - - - - - - - - - - STORM SEWER DRANTILE @0.4% -»-»-»- STORM SEWER WATER MAN -,-'-'-'-'-,-,-,-'- WATER SERVICE I SMH 1 RIM= ->�>- PIPE CASING \ INV (SE)=1008.58 PROPOSED UTILITY SYMBOLS I INV (NW)=1008.68 I i • SANITARY DLFNNd7f I I I 155' -r PVC MANHOLE 0.4% SANITARY OR STORM LIFT STATION I ® STORM SEWER BEEHIVE CATCH BASIN I I I ■ 1 STORM SEwEit ura BASIN I I I I.- I STORM SEWER FLARED END SECTION J J C9 Z 0 J 0 W LL Ln 0 DATE . STORM SEWER OUTLET STRUCTURE _-_pIp_ '•^r .. - .. - - ( I "i STORM SEWER OVERFLOW STRUCTURE s�� TJt6fII1G B11e01pbTRA1L :Y�� � OU[N TILE QEANouT WING FIRE r,K9' _ m G9 '�+$"6B---------_-- CURB BOX N ovwX am K I env E%ImNG W -- + FIRE HYDRANT - oac�® wn ♦L L-VL.I f'\V. -'-COSTING FlRE-__ --------------lIYORANT _\ �__-_ F WATER REDUCER VALVE n NM 1 m12 D 40 BD __ r RIP RAP ® C4 0I INV=1010 w00 STMH RIM=1015.00 - \ T. 11 moo\ 0`0� ♦` \ INV(NE)A=1011.00 I / -19/A DRAINTI ' CLEANOUT 1 -- n I1 s / 13. INV=1013.50 N/ I o' m m/ CBMH RIM=1017.15 018 INV (S)-1013.85 - INV (NW)=1013.85 •, Ij FESo ' DIV=995.0 r BMH 1 RIM=1017.13 INV (N)=1014.13 144_I - 27' -IW RAT. 0 7.9%> r- em,W aF RANI -PE TRGRM FAN n 14 �I OUTLOT 1 1\ \\ WETLAND \ \ (LA41A4LiE f) 1 � R R �0 GawlxG vlsry SITE UTILITY NOTES: 61GETFI(i1(NI RIrvD IKITTCM - �� IFNIY�GVF nAu FOR mVT.¢ TrPE. 1. TO BE PLACE, AND COMPACTED BEFORE ALL FILLALL INSTALLATION of PROPOSED «nuTus. TION OF R U 2. CONTRACTOR SMALL NOTIFY THE UTILITY AUTHORITIES INSPECTORS 72 HOURS BEFORE CONNECTING TO ANY EXISTING LINE. 3' MULCH 3. MINIMUM TRENCH WIDTH SHALL BE 2 FEET. 4. ALL URLR1E5 SHOULD BE KEPT TEN (10) APART (PARALLEL) OR WHEN -" CROSSING IS- VERTICAL CLEARANCE (OUTSIDE EDGE OF PIPE TO BGRMMFgRIit3)5%AM120A OUTSIDE EWE OF PIPE). EalAOE z mrcmT S. CONTRACTOR SHALL MAINTAIN A MINIMUM OF W-(r COVER ON ALL WATERLINES. 3' HrvWi 3L19.Lrv, C1vA4 FIlT9l 6 IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATERLINES ���� AGGrsEW1E. . / -I Z E MnON BASIN ' ��. E W RSA PROPOSE LINES, STORM LINES AND CAS LINES (EKITILE M N AND MECHANIC), THE SANITARY LINE SHALL BE BOTH I IRON PIPE WITH 9GNE MECHANICAL IOINT5 AT LEANT EO FEET AL BOTH SIDES A CROSSING, _ _ __ _ THE WATERLINE SHALL HAVE MECHANICAL JOIN75 WITH APPROPRIATE I _ I _ THRUST BLOCKING AS RE IRED TO PROVIDE MINIMUM OF 18" ' -15" RCP \ \\ 1O12 019%RB I y I Ef it 0.9% \ J DRAINTILE \\ \ UNDER CURBiL \ 1 --- 015 14 CLEANDUT , ; J�-, I I I �/1 1 1 1 E 17V -IS' 1\ It IL Ll% 1 7pT4 STORM QU CFARANCE. MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AW WA C150) (PASS 50). 7. LINES UNDERGROUND SMALL BE INSTALLED, INSPECTED AND APPROVED BEFORE BACKFILLLNG. 8. TOPS OF EXISTING MANHOLES SMALL BE RAISED AS NECESSARY TO BE FLUSH WITH PROPOSED PAVEMENT ELEVATIONS. 9. ALL CONCRETE FOR ENCASEMENTS SHALL HAVE A MINIMUM 28 DAY COMPRESSION STRENGTH AT 3000 P.S.I. 10. DRAWINGS DO NOT PURPORT TO SHOW ALL EXISTING UTILITIES. 11. F3OSON6 UTILITIES SHALL BE VERIFIED IN FIELD PRIOR TO INSTALLATION OF ANY NEW LINES. 12 REFER TO INTERIOR PLUMBING DRAWINGS FOR TEE IN OF ALL I I UTILITIES. 13. CONTRACTOR IS RESPONSIBLE FOR COMPLYING TO THE SPECIFICATIONS OF THE LOCAL AUTHORITIES (CRY OF MI NNEAPOLIS) WITH REGARDS TO MATERlA15 AND INSTALLATION OF THE WATER AND SEWER LINES. 14. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR _ COMPLETE. THE CONTRACTOR SHALL VERIFY THE FIELD LOCATION OF ALL PUBLIC AND PRIVATE UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT (651) 454-0002 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 15. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED 6 PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL INV (S)=1006.70 CONNECTION OF SERVICE 16. CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. 17. REFER TO ELECTRICAL PLANS FOR SITE LIGFrnw ELECTRICAL PLAN. 23' -12" RCP 18. CONTRACTOR SMALL BE RESPONSIBLE FOR ALL RELOCATIONS, INCLUDING BUT NOT LIMTID TO, ALL UTILITIES, STORM DRAINAGE, 1.0% SIGNS, TRAFFIC SIGNALS d POLES, ETC- AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES SPECIFICATIONS AND SMALL BE APPROVED BY SUCH. H 7 PROPOSED UTILITY LINES RIM=3009.46 I INV(N)=1006.47 -rn-m-Tn- FORCE MAIN 7 INV(S)=1005.47 ->->->->- SANITARY SEWER I I \ _a _ - - - - - -- SANITARY SERVICE 36'-12"RCP ----------------- STORM SEWER DRAINTIE V �1.0% -»-»-»- STORM SEWER `- WATER MAIN MH8 I-I-I-I-I-I-I-i-I- WATER SERVICE RIM=1010.57 >- PIPE CASING Y INV (N)=3005.11 \ PROPOSED UTILITY SYMBOLS [NV (5)=1005.0E • SANITARY CLEANOUT 125'-15" RCP 1.0% • MANHOLE J I I • SANITARY OR STORM LIFT STATION STMH 9 0 STORM SEWER BEEHIVE CATCH BASIN I RIM=1019.00 I Ir INV (N)=1003.96 • STORM SEWER CATCH BASIN INV (W)=1003.66 I ^ SMIMMI@LI: I 10- STORM SEWER FLARED END SECTION MYFVW.% IN SEWER OUTLET STRUCTURE J J 0 Z_ J 0 LCL W N 0 1 NI(ID1A t]IYSL4IANITAL _a- -_- - x1P __ •T - STORM SEWER ovEaFtow SrauLTURE RNA-Ax sTRAIL 12 � 10 � \ Q o DRAB TILE FANOUT ArvEi INV=995.00 i � H 0 01.00 INV= � 1. 1 - + LURE Box ® I\.WM ICI FIRE HYDRANT o[c� N1I -_ -___ _ _ '��---��_ E WATER REDUCER -� Nvwvm I=I -�'- _-�______ _ _ _ - _-�___-_ VALVE D 40 BD /a�e�rwwa �61R RIP RAP ® I HYDRANTS SHALL BE CLOW MEDALLION OR WATEROUS WB-67-250 ALL HYDRANTS MUST BE APPROVED BY CITY M ".AwT .M 91.a1 GEA 9FWf Y1NRp rissal RW T M NQNt IFIIGTI. FoR SIE MSTALL YAQIEIIiFD YaVei APPYGxTq, . RED d sem Eft cC TR ACER sox (sh. TAPE WAPFMf anew 11E FI%1 uOss 1 W TE n AS wIE➢q PFA ROD. OETAX5 EMSIIRG OR NNRE iYA.ssO1.5502 CURB OR WTTER LNE XYBRµT (� r VALVE BO% / 24' el WBIG YAIA Nadir a it �- GAR VKL£ TEE AND1/3" IyERcuNs, RDir \\\\\\"M1M AOµRR POL ] uYERs Ci PWYETHnnsE (. uIL) 6-x+e-xs- soup WNtlEIE BLoc. NOBS 1. ALL NYORµis 91yy XAL£ y[EP ry0l[5. 5 COMER OKR NAH ]. KL PAWRp p/RFAGFS 9fM1 BE AIBJECT TO lint YEµ 1FAr1£MTY PERIW As NOIEO IN SECTpI 103 Gi TfE WARRYNN SKMCAl10H5. 4 ALL . MSTALLAIION $X.YL IXCLUCE A HH%tµi YAIXFA 5 ALL HYDRA T TO BE LOMB TO V RT MEGAI LUGS YEWAWCK XYNT RESTRAINT 6, ALL TOT OF HYDRANT PLUMB i0 `2RPUL AYIs. YAXMV4 N10MABtE TO E 1/2' PER FOOT Ci . J. HYDRANT TO E MCIRELY COIEAED MIN PIASM elqi BRIi0 e4CAlE 1NAT IT MAUT 5 W i OF yAxGE. fof TYPICAL Y0610Si1fd1 HYDRANT INSTALLATION a You ENGINEERING DEPARTMENT PUR NO.. 1004 Add Mantic Between Frdne And Rxx, Manhole Caotm% Lid and Adjusting Rings (See Plates 2110 & 2111) Provide Ifs Sorrir on all sonr senver mmhN.(see elate 2109 Momme steps shall ba Neenah R-1981J, 16" n canter. Steps Shan Ix on Downstream Side Unless Pipe Diameter is IH' or Larger All 'pods in manhole to how "0-rinc rubber gaskets. Infi-shield external seals or as directed by the Engineer A Maximum of 2 Short Manhole Riers to be Used Directly Below Care Section Pipe anall be cut out flu" a with rude face of 11. Kor-n-seal required SECTION VIEW Minimum thickness or Drec Xt base is 6' fa 14' deep or less, and a I' a thickness fa eery 4' f depth Aearter than 14'. Precast Inverts Must be 1/2 of Pipe Diameter and Benches Sloped 2- Toward the Invert Nor-n-seal manhole or equal considered mc,tW. alternate. NI dog houses shall be grwted m inside and outside. .. When the manhole a colch basin structure is constructed autaide the traveled roadway a witness past and vgn (MH) shall be installed next to the mpnhdl a fOFIp� STANDARD mim MANHOLE -15 hi iv.cz a 9 ENGINEERING DEPARTMENT FNfl' 2 001 f Sir,- PL Vi riaae C All Need post denoting curb box. Top 6' pointed blue. Curb box with s 1/4 pipe and IM! ary led - water Service 1"%1" Calian Cork I Type 'K' Capper Concrete Black Support \_Watr Main NO S 1. D. not plug mtl of verb slap. 2.S Add c gimped pigtail to curb atop. 3. the capper sconce Ilne betweenof the main and cw6 boa shall be one c ll, to a piece of piping, spikes will not be perci -_. 1. Cwpomxieq coait l0 be 1' x 1' 'morale diarrandurs an _. Saddles required m fi' DIP,o o small. mamz and all moms and es m s IY a largo Saddles when reuddie wall a Fare l V Fwat enable .. Stainless steel saddles required on all PVC wotermalr TYPICAL WATER SERVICE Ey�E¢x-11 ENGINEERING DEPARTMENE ' �1005 NlF WYLG Nses FtU91 l 1/1 �L YAa Glaxi M IY 'IT Re N11gE(w lust) V921m IX VYII . SWTAXa. es". RNA lse anon Lam m¢uYwaffsz RA® Ra191 R ,I �` 01aAIFp bP •Isixel YM1 lrlsms - slYw q Rw"w se.o - w.rtRain NN«.acs we I ♦ ski I tMEss c4YID Wl N \,% sixi coons i°�0 Ar w MIWa1 rncx<Yo-rs rl zfT Arnal i umlassws im uv eEalmEYvns 11 I 3 I/�' S W4FIF5 FQ IFID aQl%rs p IENFA$ `y 1 6�1�5i.1 Rat, Asis A-b ¢A41Y -Usi O4Y Mal. sIY-A-N 6AS5 MIA YSFD RU. Cool xmi RTI1 6 -6YS IEr4 x0 al camses B. E1g114 iRMR IM 1H5 / IO 1. lBs ��E1��qq MANHOLE CASTINGS �1�,1p1�1 �OFp VIlN1Bl�J� AND LIDS DETAIL EMS.. r-n" ENGINEERING DEPARTMENT RIAR rA. 2111 AF RYE:G cs111 - - L5' Minimum cover required Tyler " _ b0 over top of .olr man. Mueller No H-IOM1 -"� 81bby-Ste-Crox No. B-51W Provide valve Stem Risers To Within 6" Of The Surface If The Distance From The Tao Nut of The Vow -- The Surface Is Greater The, -. Grace Q AdIust tap to 3/4- be TNer No. 6860 26' grade. So to be set tc Mueller No. H-10361 26' provide 12" 01 adjustment y Bibby -Ste -Croix No. V13502 27' Myer No. 60 Muenr No. . -2 EXTENSIONBibby-Ste-Croix roix B Tyler No. 58 I4" er. t Gate Valve box, screw type. No. 59 18 3 piece. 5 I!shag. sae No. 60 4 G box. T-fi extended , Mueller No. 58 1" /6 roved base No. 59 20 20' Bibby -Ste -Croix V13520 No. 52 9" Gets Valve Adapter_ 1/4' VB521 No. 58 14" Steel With, Protective VB522 No, 59 20' Canting, I/2" Rubbr VH523 No. fit 26" Gasket Installed Between The Gale Valve Ant Gate Valve Adaplr. BO W Tyler No. fi860 65' MUNIr No. 1 65" Mueller air American Bpby-Ste-Croix VS516 No. VB516 60' no. Contral 60 Reliant Wedge Valve CMforminS tD AWWA Val or and Box to be C-sts-SO Standards - plastic ..appeal per Wilh All Stainless section 2.03a Steel Nuts & Bolts- 1B"%1B'%B",Concrete Block F TYPICAL GATE VALVE C[fIO CO�AND BOX INSTALLATION NEV15FA 2-W ENGINEERING DEPARTMENT FUR Scl 1006 iRF NWE'G' IW6 Material d Nprtnm rill Material. Compacted to of the Standard itaneard P95%ro Proctor Density I I- I -- Vanes I� - —_ - _— --_—IIIII Shaped Natural Ground to Pipe 1 NOTESm existing salt conditions me not occe tabl, fa backfll and/a compecticr in the pipe Zone, pipe beading and backfill shall be used mx shown m detail pirate 2201. 2. A sole engineer ell be required to determine the depth of the pipe foundation aasona nl material if needed Pipe foundation material shall as accordance with hill 3149.2H course titer aggregate. 3. The Bottom of the Trench Sholl be Shaped to Fit the Pipe Barre for :- Least 50% of tee Outside Oametr. C�OF PIPE BEDDING IN GOOD SOILS mom RCP k DIP All-10 ENGINEERING DEPARTMENT MRNO. 2202 FlE wsE IX a PL VARIABLE 9' WYE PLUGGED END-1 r 1/8 BEND \ N fi" PVC SDR-26 PIPE MM. SLOPE 1/4' PER FOOT 1 Z %2" MARKER- \�1/2 PIPE DIAMETER MIN. SEE NOTE 2. `SANITARY SEWER GRAVITY MAIN SANITARY SEWER SERVICE CONNECTION DETAIL SERVICES TO BE USED IN CONJUNCTON 'MITI PLFSTC PIPED MAINS FOR Di OF COVER 16 FEET OR LESS. NOTES: 1. SOLVENT WELD ALL JOINTS. (NON GASKETED) SANITARY R RN NOT ACCOMPANIED BY A WATER SERVICE IN 2. WHEN ME H. IN SERVICE S 0 CC THE SAYE TRENCH, INSTALL A fi" METAL FENCE POST NEXT TO 2 % 2 MARKER AND PAINT TOP 6' OF POSTSTFL FLORESIGREEN. 1. CLEANOUi REWIRED ONPRIVATE PROPERTY IFF DISTANCE FROM MAIN TO HOUSE EXCEEDS 90 FEET. 4. ALL PIPE BE 3 ="C J44NULAR BORROW 311A OR COURSE FILTER AGGREGATEE (31 (314- CM OP I TYPICAL SANITARY Maw SEWER SERVICE ENGINEERING DEPARTMENT nAR X0 2001 qE 11FIE:IX 1 .acted Botkfill Material Foundation - If Recurred u 1 "Bc" Denoles outside diameter of pipe NO -ES, 1. A wants Engineer will be requited to determine the depl+ of the pipe fou __ emhedment mateid if needed Pipe foundation material XI be in a -,- with Mill 3149.2H course fiktr oggregate. 2. P.V.C. Iedeing oral be MNOOT 3149.28 si granular borrow wit, 1009. passing a 3/4- sieve, and less then 10% passing a NO. 200 sieve. CMOF PIPE BEDDING CffAMMFOR P.V.C. PIPE RetEn. z-lo ENGINEERING DEPARTMENT fled .: 2203 IX o r 4 z BpOO SfiR qiCC ::'opaa ?3 j U J J^ V z J 0 LLI w N O fllExA LYMkII z D W F, un tz 9 z z OFF = N U = Q r 7 � J Y P IWLIO. l4 12 C9.01 Y s M60AM eskAnOw 'B+xvnON ro �EURm ONE IFE t£Ncry DEPM (TYM.^,AL). INSTALL YFF1c4 .1. sin, ME.. WGS AS x[anpEO. WAT=RMAIN LNDER S-CRM SEWER f"Ge, AVa cWaec20 eARG M1 likii 12' PAST auT9DE Gw ARE -e. _. 5r}__ _ - br" By al aF 12 � E'y�,llll�p� WATERMAIN/STORM SEWER 40�1t1o11 CROSSING REYIs@z-1a ENGINEERING DEPARTMENTPUTS xD.: 2204 pEEWr R-4342 ski OR PPJVEO EgIAL yCNC= MJUsnNG RINGS (T7 uwx. a s- MiCN caxc. 1/.' MgirAR RET4EEN cpuwR (TM.1 usnxc. RNcs c sTRucnRE. MIXiT R SHALL MEET ...V M M IN NOTE: Ll"Ga NG TO CGkwV di,5• N "ARs AT IF OC 80. wA,S RAL3 To ke r+rECAs, ot"' v as. SERERf. HK-CAST aKNWG AS Kolua 'J J'+1 cWC. BSNAu NE 6 T'-T O 1. A fgJRm Ix PLACE M 5' PRECAST see CATCHBASIN (27" DIA ) DESIGN SPECIAL 2 � qQ��Rp�N� TYPICAL 27" DIAMETER 1. CATCH BASIN Forge[ xMG2 G:�xc�sPEa ,w ENGINEERING DEPARTMENT 3103 FINAL GRADE TRENCH MINIMUM ID STYROFOAM ULATION NOTE- mIPE SHALL BE CENTERED UNDER INSULATION UNLESS 014ER'A1SE SPECIFIED. NSULATION SHALL OVERLAP AT SEAMS By MIN. 12'. CO JRCJKR PIPEOKR PIPE - OFtHFIN�LATNG 80��- b T. b' 6' 3' �auf[UP '� I INSULATION DETAIL RFASEn:1-+o �_ •.. ENGINEERING DEPARTMENTPUTS ND.: 2205 tit. a 8fi 91`type at&cotOhbasu:a be Vansitioneal cnbbsin Frame Ar Grate !Vu.h,R-3C67-V or P .a -i NITL- n to be ale re a Y - bobs design gutter 9 9mtle. lot nclo R-30fiis.yH Noll be us= porn 2= a U Lang RebmsEach way ISOMETRIC No Scala s s 5' Mn i s:Yan Nin Transition c Topof ran "� 2 1 14 G. G. Design gutter line grade 2-b4-60" LONG Frame h Costing Rebels Each Nay SECTION A —A No Scale any CURB ���m�tme� CONSTRUCTION �.UeAT CATCH BASIN REws6n,-,a PUTS el Fec xMC G: 1ae ENGINEERING DEPARTMENT 3106 NOS t- V .^,rate Shore 2- vfi Grate Shown ran be area at all low paints Fate of Curs-7— Direction or Fee PLAN Catchbasin costing and grate Neenah R3067-V by qupl*P,GGa,t o be 2" below 3' .oalius cure hoe.grade. n sica curb a each icabasin. Precast c neU or HDPE copies, rings, 0.2 Varies Minimum of 2-22a Dian Dr Varies .marbleamenVCrres mete a' eil��/}' minrerum to 1/2" bad o tbetween each ane a6' tack concrete Irout an the outside. 6"Mtn. base Doghou shall be toz =gualen gala S-OTION. e one taiae` NOS: Steps steam be prayldec in all catch basin/manholes and storm sewer marh Wes. astir, to be totolty encased a- concrete curb section. Nc block structures D allawetl. Nc wood shims are permitted in the booting :ngs QROP STORM SEWER CATCH BASIN 2' X 3' RECTANGULAR RINSED. 2 tq ENGINEERING DEPARTMENT Nq RUs 3101 RF NMIF:G D, PLAN -:AP RIEWREMENTS NTS NOTE - A. RIPRAP REQUIRED GRANULAR FILTER REG. - 24' 6 to 12 CY CL] UNDER RIP RAP AND 2 33 14 to MCY Cil LAYERS OF 51 MIRA� .6' 23 to W CY CL-3 FABRIC OR EQUAL �.: UP 62 CT and up CLs .bic yard is appro.kratay 2.600 lbs.) 2' � RIPRAP Ganum F•uter (MNOOT 360: 2E. SEC TIGN A -A eeote.tile Finer Type III NTS 1 RIPRPP �ranular Freer (NAME 36019; SECTION B-B Geoaartily Falter Type In NTS QR� RIP RAP DETAIL I�yva.2 1a ENGINEERING DEPARTMENT ' Nq 3107 Foe NNC a: D7 6" Conc. collar 24-.36- Min opening for Nees- R3057-V o, equal ate: 1- v Gate shown 2- VB Crdles Moll be used at a o points. -Neenah R3067-V casting wall grate or equal. PLAN / Wvimum of 2 �ma. of 5-z' concrete tment rings with Cof mortar. Prost concrete. HOPE odpsting nngs. 6' precast reinforced concrete slab. Top of barrel section under top slab to lems, Reeled 2 beads of Raamnek9or equal. with All pints in manholeve to ho varies 0' g rubber gaskets. -D Ties. Precast concrete section NOTES: 1. 3aghouses soon be Srovlea o both the Put do oral in lee. 2. Na block stnuctaes are ano.ea. domicile Wells. Neenah R19511 or equal. 16 or. Aluminum Were e \\ approved. �/ Minimum slab thickness, 6' fa '< depth. Increase thickness 1' far each 4' of depth greater than 1=. and reinforce with 6'.6' 10/10 mco: Grout bottom of manhole to 1/2 SECTION diameter at pipe and slope moat 2' toward invert. Off 1 TYPICAL 4' DIAMETER MIM CATCH BASIN MANHOLE FILE FILE well z a ENGINEERING DEPARTMENT ' eq� 3102 _1F'G ,D2 See City Plate No. 3107 far harep placement. ef pints. foster shetall ato bottom ISOMETRIC NTS NOTES. 1. All Reinforced Concrete Aprons Moll be furnished $Installed withal Tros(F—d, 2. All new Reinforced Concrete Aprons on new pipe shall be Fed back 3 p;pe langms back from apron. 3. All n w Reinforced Concrete Aprons on GrsTing pipe shall be lied I - pipe adFcent to the apron. QRff FLARED END SECTION IR+6EP 2-1p ENGINEERING DEPARTMENT ' up: 3108 nc xMea a naR 0 A, gall M��i M N e t5�= i3al� u U J J V) V Z 0 J 0 w H_C L V) N U z w � y O Q = a z z = eC U z Q O z Q U U o 7 J r y u R PL CL PL 30' 30' 15.5 to Back 1S5' to Back Wew Course to be 1/2- — Above Edge of Gutter 3.0% 2olt �- oqe 5r for L5 t woin[le nor I I/2 -MNDOT 2360 SPMEB340B 4 MuIPU Soda wain Me Tack Cool - 2357 Surmountable 2'-MNOOT 2360 SPNWB QiCB Concrete Caro 12'-Class 5 Aggregate Base 24' MNDOT 3141V213 Select Granular Bones (•See Note T) 1,MinimumRlghl-of-Way Rewired - 60% 2. Makimum street grade g.GA 3, Minimum street grade 0.75S 4. 4.0' Topsail placed in disturbed areas. 5. 2 Rails sod behind cure. S. The bituminous wearing surface shall be placed the most construction season following Placement of the bituminous base. Z. A test roc of the Dfspirel subgrade stoup be performed by the owner in the presence of a city inspector. The city has the ouUtorily to require additional subgrade correction based on the lest roll. 8. Drantile shag be placed Nmeg bole sues of roadway. See plot. 5232 for detm's MOF TYPICAL RESIDENTIAL STREET SECTION ENGINEERING DEPARTMENT RATE NO.: 5200 DpeacsPisead : seehawk, NO CURB & GUTTER A '4I wu m mown aw Hors ker,=, a IApf ¢. 2 — — _ ¢. 'qm: vaTUM nor o wM P uu�.seowc Wid- wcu oTatCi won cw Pr. exr m ® ssns zmms Nra— wH .hhi F ke 1,,Et 4cTah myMs iir -1 is Iwwwr q z-e' unz o wT�m�ms wmne'�l s ssst CURB & GUTTERm .. Wal —srel-1S7 L.uL u0 Nry ,a O Is A ui-r VRq wTewYR wM T6rs1 aw4—huh, - - qua Mass no W M ,,,Ao seer m am oTM red s:M[T an,Amr rar sa ro As�kill ®. . w.r T— — op" CfP[OF RESIDENTIAL BITUMINOUS DRIVEWAY ENTRANCES WITH AND WITHOUT CURBS RIMSE1 2-10 1 ENGINEERING DEPARTMENT gAIC IfR 5209 F2E NWC G VNg-�\sMe i 6' 1 Distance, to CL variable �\ - ' I/2 r ioD Bilvmmous Material I ape 1 _ }/4' er It \ 0'• 18' Mn001' B6 88 Concrete Cura and Gutted _ Distance to von 1/2 r� - ous Material i<Lots. slp0O 3 4" Per612__ Curb and Gutter ••I: i2' to D,hok.ss. .r Media s. 28"R 12-R 1fi' Tap Bituminous Material6B"R C _ 10 1/2" Surmountable n I/2'28' Concrete Curb and Gutter _ 4' 11/8'r Bit. ' ,face Bituminous Cur I Farmed .-� [Mar TYPICAL CURB Cw= AND GUTTER reg,gu s-la ENGINEERING DEPARTMENT PURR IIa 5203 fi£ W1LG VARIABLE Z W ICI HYDRANT T- VA'_VE BOX \ b 6 VARIES Ilyµ� (SEE PLANS)ANS) CURB 1/4- PER FT. SLOPE TO XOADWA" , 4' CLASS 5 BASE J _ M., CONCRETE SEE NOTES I & 3 NOTES. L TYPICAL 6" THICK CONCRETE SIDEWALK. 2. USE 8' THICK FOR COMMERICAL DRIVEWAY CROSSING. ;DINT SPACING AT 5' INTERVALS. EXPANDON JCuNT SPACING AT 100' •;TERVALS AND WHEN ABUTDNG EX STING CONCRETE OR STRUCTURE WIN CONCRETE C SIDEWALK likedisix,'-,a I ENGINEERING DEPARTMENT PLAT el 5214 f2E IWG¢ 4 -APICAL RESIDENTIAL RADIUS - 20' -IPICAL COLLECTOR RADIUS - 30' 6" height 2"drop 10' long transitional height curbing' 4" height T." 1 ' MNDOT B618 CONIC. C & G SURMOUNTABLE C & G SECTION A -A CM OF I TYPICAL CURB MIM RADIUS FBI ¢YaFsla sv4 ENGINEERING DEPARTMENT pLyaE 5204 10 AGGREGATE BASE MNDOT SELECT GRANULAR BORROW orp� COURSE FILTER AGGREGATE i 3149 2H o W �MNDOT 12" DEEP GRADE TO DRAIN CLAY SUB -GRAD 4' PERFORATED PIPE NOTCH CLAY SUB -GRADE GEOTEXTILE WRAP (3733, TYPE 1) FOR PIPE PLACEMENT TRENCH DETAIL :PerfON&,,d PVC LCA, LL PIPE DETAIL NWT AROUND PIPE NOTES, IANOUTS REWIRED AT 300' INTERVALS & _ ALL ENDING POINTS. 2. SVANG DES TO BE SHOW ON AS-BUIER _ FOR ALL ENDING POINTS TO ALL DRAINTILES. 3. OPENINGS IN STRUCTURE FOR DRAINTILE TO BE FABRICATED OR CORE DRILLED. 4. THIS DETAIL TO BE USED WHEN 2' OR MORE OF EXISTNC SOL SUB CUT IS NECESSARY. CFFI OF 4" SUB —SURFACE affm DRAINTILE D'}14 ENGINEERING DEPARTMENT RATE ki 5232 !q NIy[-Q 5f{ 53]2 Y 22702 - _-W PT. RAINAGE 53 60' R DIUS 1 "+� Iv+ fi0.2" f' - CURB AND 285'S2'50'sRC la ky0 6025'_ CIRCJM 4SS RADIJS=285.8B/360' 90� ` Rn JlyJ . I 3.�5 1a I STANDARD CUL—DE—SAC X COM./INO. 6C' RAD. URBAN 6C' RAD. 45.5' RAD. RURAL 60' RAD. 40'. RAD.• •NOTE: I ALL DIS'ANCE FOR STREET WDTHS ARE MEASURED TO BACK T 2. PLUS 6' GRAVEL SHOULDER. (RURAL) �fw TYPICAL CUL—DE—SAC a� t-Id ENGINEERING DEPARTMENT T4ATE 5205 qF WIEQ CS\S2U'3 METAL TOP PLuG MADE OF MATERIALTO ALLOW LOCATES VMETAIA PETAL DETECTOR. FINISHED GRADE PIECE PVC SDR.-35 -If +NOUT RISER AS PER PLAN) ONE PIECE PVC SOR.-35 CLEANOUT RISER (SIZE AS PER PLAN)—+• —III—III—III i -III—III- ~ i —III—III— u III— —III—III �'. -III—III III = I —III —I � I —I o I —III —III I dII1-- —II—III—III —III—III—III I I IIII—III—I I I —III —I I III —I I —III I I I _III —II —III—II—III—III RIOGIO SDR-35 1 10' MIN. NOTE: 1. SOLVANT WELD ALL JOINTS ON CLEAN OUT. (NON-GASKETED) 2. CLEAN OUTS SHALL BE SPACED AT DOG INTERVALS (MAXIMUM) BENDS AND RISER TO BE SAME SZE AS DRAINTILE MAIN. ALL DRAINTILE MUST HAVE TRACER WIRE TAPED TO THE TOP OF THE P'�F= 'NO BE BROUGHT UP TO THE SURFACE AT EACH STRUCTURE OR CLEAN JUT. TR= _ - _-CIFICADONS. FO ONNG COMPLEDON. THE CDNW<I -` -0 PASS A LOW VOLTAGE CWUCTil -EST. CMOF SUB —SURFACE PVC DRAINTILE C�� CLEANOUTS FOR INLINE AND END OF RUN CLEANOUTS eEWsm I-12 ENGINEERING DEPARTMENT NAII 5234 iY£ WIEG G SECS\52N i Jill g WB®S �g "aS�W u its 11H 7f isis U J J G7 0 Z QI J 0 U.1 H LU 0 cZ C w zz Q L� Q � FQ _ ~ U z N U QZ=Z U V U 0 � O J ) Y U .Iq. 19]R411 C9.03 - YIN. IFNGM sma POS" -' 6 R. 40Y 5➢NOX a Rn. IFN6� SRII > N/SM M YS A :W� T19E) n,._ R�SRL ID RS RD w i(➢ e' _ I5018 TEN�)F ' THE CCtPACTOx 2p1= LCGhY N TIP Y _ 9:.�$'s LEPIX 1SILT FENCE, MACHINE SLICED 1 2 9LT FENCE. HEAW CUT t 2 '. YIH. L3Gtt SIFFt PCSi GLOiE.TtF FA-C STRPLES IRENLH. BAGiILL `FABRIC .VP0 NAGS MiM iAMPEO ANRAL $OIL a w _OW Zp SLT is L Ta T IA. F 6 CM CCxi-Z DD` 2CVE/GiACE IN. O l£NGpiI1Ep1A RELO'Y m SILT FENCE, PREASSEMBLED 1 2 1 VPW� SLOPE I NXT 9LT iDlfi qR YMNIT y -F& y RQ OIEAIEA M;24i aSSFEFT SEE 9'ECS 3573 d xa5. IC -R Protect Mee F.on 4ael Flo. LOCATION OF SILT FENCE FOR SEDIMENT CON--- 2 Ymvmm Casiwtn9 Me¢ t Ape AF1A9Lc V 5 T GEM¢ tE.Vt TM R (%119OE Cc CWSFJCTW LMIfi 7 LOCATION is - Trp: FOR PEREM17R CONTRD ffffOF I SILT Haw FENCE REnsEn. J 12 ENGINEERING DEPARTMENT 5300 '1M N41[ c: VENCV�EIs�sJGc •-• TO BE REMOVED , ` � I� �II i�`a.• A iiN y: i rw• PERIMETER CONTROL OCARD BOTTOM Y d,i OF FES BOTTOM SECURED INSIDE FES *ASHED RUM MAPPED INSIDE FES F. I'FLARED END SEDIMENT A�v O. / ONO pJOt'tC 1"-2 CLEAN CRUSHED ROCK ISO, .V.N.DEPTH FOR ROCK � -q N WOODCHIPS Cy S S iB MINIMUM CUT BW BERM TO MINIMIZE RUNOFF FROM SITE FILTER FABRIC ROCK CONSTRUCTION � ENTRANCE L!±ENGINEERING DEPARTMENT AArz 53 11 f� e 3p9 Pa ' �� 5 .Js Ft 4e id.cT,q�r f� �4Hp]♦f�e. T, 1 , a §- ,, ee$i e f �pMOl�Fp� Pedestrain Curb Ra—r 411ot1Ld1,1G11 Page 2 of 5 RE SEC. J-i. PULE 110: HtE rAv4 `�,G �� szt� ENGINEERING DEPARTMENT S21 $F A �— I" DIAMETER ROCK FILTER J� E SILT FENCE PER MNDOT SPECIFICATIONS. SOURCE MACHINE SLICED WOVEN MONOFILAMENT, 36" WD FASTENED TO STEEL T WTH 3 (50UB) TENSILE STRENGTH PLASTIC ZIP TIES PER T-POSL(MACHINE SLICED) A* MINIMWA I 917OF OFFROAD CATCHBASIN FILTER BARRIER REMSFD: 2-I0 ENGINEERING DEPARTMENT PurE HIS MAIE`G sPEGs 5Jo2 5302 C£NERAL NOiS - TYPE R L1141NAIRE_ Aw W _t �l,x e...a +E .waao s¢ ���� Q wwRru�+arm lsstw.rtl�nwN O Q ¢w w Y wo —TTIg GENERAL NOTES: TU¢ ucssur ra cM.r.k m[ miwu'N aw mw¢�x0 nY 04 T M OTv. (31 v.E '.u.luar a9AK a N®IRpID ,ee wEwT� 'raw W ��P� MI OF I LIGHTING mmm POLE Re�gn:a-08 ENGINEERING DEPARTMENT Pus Xo.. 5240 Tncc NAIcc � uAT SEDIME'� -AP MANUFACTURED BY WIMCO,LLC SHAKOPEE, MN., ESS BROS.. CORCORAN, MN. OR EQUAL sIFXwnoMS MD SllM6A405 OEStt,N (QABS a �.,g oM u.e e/• _.=.gym-m. am 11`r'^'m rv. wa�w Kurz �•rtmmm� ar m•�aw MODEL#CG23 IXFI( w PUT W2Rl I - CENTR OF fIX1EA.IW`S2r rL 1012-2W OFCU Nr rWRRAAS Mky 'eaDll: r�1ZJ IB:iN RF fA84k' NOTES. 1. CLEAN FILTER MEDIA AFTER EACH RAIN EVENT AND REPLACE IF FILTER IS CLOGGED WITH SEDIMENT. 2. REMOVE DEBRIS/SEDIMENT FROM RECEPTACLE AFTER EACH RAIN E',E a f OF I CATCH BASIN SEDIMENT TRAP REHSEn 1-IG ENGINEERING DEPARTMENT I Purt Ra. 5302A NUE E. o. c 9ca sJa2A U J J 'C7 0 Z J 0 W CH G W C7 0 DATE 1 ICM SUYMRTAL 1 ouwN Im HB�Rtl SLU ono Mn No. roxm.Ie C9.04 I II 1 �I I � o OUTLOT 1-�;' °\\ 'o'o'"\ WETLAND EcR ( IMaNncE zl _ \ I r / "/�� //�� //I .' 17 ��" �ff ••� \ . I III I I It 101 - / / /� /i m g R '�0118 \ I 11C• I ////' I I I' LOT / - 2 —__ / I o12' \ \ \ \= --\ % Ir ; 1018 I 1000 m / �/ / �-sys I Nab a —ry I' �'` `/ % r, .`� `• 3 ` \\ � \\ 1 / q1 f/ r p8P eee . 100g 30 2 P1 I I 980 \L '9yS i - 1N06 / / EgS101G IPx m0a,ng511UQ �— � __—�lP=— _-..� NVE-iM. I / cv.Ia— II41 44 — „x , VN52.45L., �`I--- _ . _ w._ _ _-__�___r_ \ \ ``- . Q.P - .ww W PLANTING QUANTITIES SUMMARY �", mnrGRwaaroav,ow Retlme�rs l5 aa+elreRORN11a@BIIS a,lifRrum PtM1TII,G: Pal SEL ]6„M. TIflE, %H2 C BuamrNN PLVIIMO @1WffiI I®M V4] man. aia3lYiam ateelF. 2 GVICPY TREBIIMDE0.51g1Y TRa'S. b5NRt6 cvlovr REPvaaExrfl uNvrR®tmFNrs }� &IfS£0.rPA➢FEWIAB) 9fi9I1'MaIMW1EfD , oEawausfl DxOwm,.s omnoav RaEEs 6i 66 � i � `o CfCIDIpl5fl G7a11� DXCERSfgIY l8 38 ti T DEdOWl5&XWI Wi5 IUJBS RI .1 S�$ PLANT LEGEND+ 9� OEBWIS OVa6lMYlPHi-LS fAL CB: SO OPXWBIIKTREB-LSCILed 33 S HIN aa� O ��a £g4Y'F ���5 oac-auvemmEs smvlamwr oRMxE®wr ONaoc Wo. mmmwe wo. �Qs43 Wo &10<EYE RBUIw 9Mba ODUFRE. ASSOrt1ID RDAERIIIG V,WETIES Wlia Rix w 2 nrvEn M1SPEN ¢ �s3� : 3 pwr P/yFA B[0.01 MGIMTMI A91-H1 vMRT1E5 e wb PaP��Kva saNa yn GINGKO IMIRmNKIPH II NI NI PXeamwm am.es 4ONEttocusr-„u vullEl3Fs PEY•voarww GICM1aa baonGm renR Y9. A,ne maNca 9,t`PPXI' IINDEX -Ill VNIIET= RDMFAIWi flI1M pl ROSE 1PH Ei OmUa na Mn- Pru6rs 66m. aN-om Re¢rurt vlRlEr� wINESE mEr_uvt uYr.rs yq. 9//ir'p rffiln �/•� J - t C/� OJXMTOISOYH610RV 11� 6d N1.®: 16 GECmIA16 N0 6 SITYI6: 41 Ina mis,v J Z mmm�R Ew cnr+roxlvc uac eoo. W 6A rwuRra( LLvffia < Idr¢Mtiru NED IVAG DOGI�OOD Z Z Z T anurf sera ¢ g YEl10Yl TVIG NGNLW � = 6 m Tiarinnlm' U U, PI®gla� VRURHumUM 0 P,P. loos Ga111� PRea 9W Q [gpr•atx Panrima W R�9 Pm ME WINGEOEU � O Euplymua maws7 PIXrDERD ME C r P�naz oRNe>® WOERRY edemz.wRanz < W U NM.W YPINE Plnus nsr Ma11DM: J WHITE PINE A NE NPRPNi 0 W Xnu59oX,a Rl6esaipnum } g 5W PINE (I=fN 1D p E Ph.e aYK�'Ia PNIIIWJ us mr—us ppV.4� FIX !3NMMW ND SPIPEA P..O.Ex.y Rd�P sPirea moromm m rINLIJ,� PEII61VnKIlm w/ NPM(6a73 pgwgryy5 PyM1SII DwTE N REV610N MYW1T fdlCPmlGai 1 VI/A,6 Xmvambapp. SIM GNc OfY 519MII1N w6vtl.s(PPwe G-as) MDIo+ Iu olsRURem,zIN C FDI N xm s000m aR m exa ems �ry WFI MFACUV Ym 69R taR ENIFG9PT MVC41 mxomaa _ _ _ _ eERarIND sETemc - _ - _ svN6r N D.NWX ® oercr® awr P.o�i.w rvm.� 0® L101 NOSEE aN 9WLMHTAIFMONftN1NMOMIPFaO1H DFDIPMIFLRM wRIPS MIDIEL .NL F4Rll pa tR6 6d DII9EiSL M' N91, s M. ce ro LOA6(aIAMDI. IILa MDIarN11 SNNL: DmB1IKro11ETPart roalz CO NOF KAwLY IAINE nETRH AT RMILD4 RpFE WYq®191LNB{ OY WPpw.'F IfH.FIa u4 BslNl m oFM 9WOE5, m1ENL9RTW6Aro UTgN BWp1E51MY E REp®; IgNFT9lm pFIBYFJR T1ET91M1Yip5 fF a1MOBlIMT F21ElOroT1E EDfE6TLEgIDWM1 Si TNSpITK $RY4®ATTIE WH.TpI(F WOSOIEYpQIgT wpplgg TWNDR bK SEER®. MAY; lxE NAIX $R W nFTN£ q TENNSBR. MDNRATF 1REErorASENONIXNTIE lHO. 9ET i1S FF HUT BNL lUH1 ro IN➢E pl I-2 p. INi9 N SIOMIY pIMNG SONS OMIPARp1 a RESIOQNE W1181DG RIYDIATNW MlBM1IW TO RMRD( I'URFr LWDA.V4ARWTET6AM IOIBINAL IWINVF ®$ RUgtro RNIG RMIIW D6TNLNgWHIgW�ERATpV15KOIPKT®. IIU MQPAPIL1Ni6RMrt REUAN?AT RAttVLTNEFIX WWISICII.PERS DRFcrwra 6 R.WT a SMDYTL Wml AOYITI➢EIIAgMTMF HUIBNL, SIQSDIBOFO]MILEII Aw lmv.F WNRFTaY IS FlIaa$CA4MJI HNID1DSSro RUHUrsart OFTIE pnaurp DF Parnw mE, TIaN arce RuwIRrAM mmlxG Hwrs. m INRDIETRVISPWIDNG sL11 M TILEW MO VMIEiEs SWTADE91gG RAM® ONLY. PI xF, DVL MORE IpEY107HTA1DOWWME. PI BRANCHES TO A MMNUM OF V TO N-LUR FOR A OFAB SIGHT 06TMY.£., PMGVIDEGRAVELFILLEDgy WELLFGRPWRLYq 'NED$OILSMDIMECMD BYTHELANDSGPEARC ITECT. BALLED AND BURLAPPED TREE SO SCNE SEE PLANRNG DETAILS FOR INSTALLATION REQUIRE" TW 506 ARO MD ROOT BALL 609E AND WATERING RRiG FIRMLY WITH FOOT PRESAIRE 50 TINT ROOT 6H4L D NOT SIFT. AIN UNDISnWB® SUBSUDE HINDER ROOIRNL \ F2(gVAnON MD BIO]DTLL SOIL IO A \ I WWWFL40PE EQWY TD OR LGVFRM E fNlAnM nMN BDROM OF PLANITDIG HOLE -1 �•... ME ISWEADEQIUTEpWNAGEIN HEAW jr / SOILS. GRAHAM SOL MUSE W ADDED As A BAOOILL M AREAS OF NOR DIUTRAGE. OBALLE D AND BURLAPPED TREE PLANTING ON SLOPE C BD LLE PLANTING NOTES t. D2NTRAC1p0. SHML LOGTE ANO VEAMV IOGT[p60F ALL UTIlII03 WIMN MD NEAR PUMTD3G AREAS (SEE NRTRIGL DMWM(S). COMRIOTpI SW1 DIG OUT PVWIBIGS M AREAS WRN UTBmE$. 2. IMD6UJE 6NTMCTCE SHVL BE gESpOT®1E 1b NOIEY I.vwsFAPE ARDGTEcrwlaJ canmaNs DETRR4DYru ro PERM GROWIM AM1E ENCOLNIEI®, SUOI AS RUBBLE ESL, ADVHLSE DRANurE o3romaNs DR OBSTRUCTIONS. 3. IAF815GfEARDRIECf TOAPRiOh ACL R PLANTINGISTAgTIC ILGno6s PwaR ro wpuL mwxEHmNG. 4. PLANT TRFS AND SNUBS AF1El FBYL (PILES ARF f11ANISMED uro Palos ro PLVMI➢MG DF uwr6, uAss oTl,aLwLSE IL%BTARE ro 1AfO5GPE ARORI£CT. PRD+mE RANTING soa AND AMEMDABAIS AT TRH RANTDES LOGIm AWAY FROM SHRUB B®5. S. W NOT MALE SUBSmNTIONS. 65PE�lED 1M05CAPE TMTEIUL IS NOT 118TA1NANF, Fa1lI% WIDSCAPE AROIRER, AIOF6 WRN A PROPXAL WR 11g OF EQUIVWB(T FIAlER1AL 6. IF T3ERE 6ADLSLREPANLY BETVEEH THE NUMBERff RAMB SHpNN OII TIE PW MD THE NUMBER EfIO\Vn OX TIE PHALLI LJn, T1E NUMBER SIOIWI ON THE PGW SHALL UJVEA.Y. 9. MULOIALL PI/IFRBIG AREAS WIM QEVI, DOUBLE EHREDO® HApDVgOD MUDI UTAffi OTERWISE NOTED. MULOI IMTERIK ro BE xmmEz4 r DIB>rN (rrP.), xD BARK snots aR TvnGs. B. LMDSGPE DOI3IWTCTOR HIS OPTION OF GUWUNIHIXG RUMB TREES THH11aN B6TRIlAl10N AND z TEAR MAp1ENAw(F PEOW M LIEU OF STAMNC Aga GUYING. 9. WOARAMTY RNlIS f0R2(iNAY1nG 5EA%JNS-2YEMWOARAMY. ID. $ETIRE RIRBA101MpTAd TMIRCiOlF WMRMIIY 1611M N3Oh MLfl/f$G1101/A£ qpl ll� N6T BE RIM®s W I TINT TIE NO! f 1APE a va®£ AT TFF!Tv6TMEam BUL TR[ESMeIETI[ImrRuxaND! Y®E9WLEN81®. DO MIOTaInE TOD6TNE ¢Of E4L NRX90L ADJT Wl5 FHINHI61 WIMnE IAVTRNE 10.11E TI W1 r®wrTIETV ceI1E aYLYIAL E REN:T®. T 14MASSM�, DOMOIIEI� IVOf N 6RT.C1 YT11lRH TIBIRMpTNInE1YalE®11HgIl1E plMllON Cf TIE wAHvrFn Pe®. IA.rf NFL1 wmw 4e loua DF sHnIL WATERING FULINMILENCLartIaro ML]B.T. DIG RqF 4 ROUT WL W p1A95P�F504RMmg1 DICLUNITFHI WRXTMDDUSLLff AMDYTHiXE S6(S MO 6Tlg1 p THE xDIE eEGRe PUDNGTIETREF pTla RAMrtw la>LL yO3tu ]/i DARN IhW61Ep RAYipG m4K SPEQRFL PoRnE srtaElE soDmrmmax EJIO]INIHI® Mw wATeLTllwwxr wrtxpzHDURs. B.SlDBl RgwxlxG wwlTHw wHDuas Am .THOROUGHLY UlflN y1I91 CEKV1p Ep£ aF HUT 6V1 M10 WATq TUKY. PEFIQ�E Nl TwpE, HN4 AVo WIR®151iTAW RIPJAP FRAM TCP u1 Cf RD]T &VLFA TO MJ 0.DIG p W@E SOSYFI. WMOIMR a a1UTU. RENT'E NI RASTC WRA➢OR Rq4 F2'.M BRIRE B41 gNWGTIE 9PRwG RARING SF/SaI,ANY $ETTNEE 0.U.B.WD 1WMAw nI0.p1GLICUr WIfCUN1YPENCO. EYERGREFN RNIi OEINEIEO WIRI LEwgbMX w AINMICE srACf of GV6lL1gENDWILBE EIOITBEE WSF BE RNLIFD sUMnMr THERDT FLAREIS RFJECI£O. EYFRgEE111REES MOr FLLLY 11tEAT 11ElOPOFTEM'.OTBNL TREES WHERE T1E RWf RNENNDTV®FMMILNERFlCOT WMTGOVED BR/JA. ED fRLW BOTTW TO TOPLMLBE REJECIEDANO TN]SE WRN nRMML IFMEIIG 1CPCFTEMgL WLMRINL HUr B41.s DELNERED WHIR EFCEFDIMG ]pI MN (1SIIN IFMGTIWILLILbE C TIEIOgPFlMEYgETLMXl6PV TXE TCP OF ME &LLL WILL REIECIEO E16BIF0. p SEY[w ABBP�.DOMOTRALE MIILLH IN CGNTKrWITX SwTP$OEY K 4ER .THE TRIINE,WNTANTE WLCNWETDFRTT DOIECTI(Mp W6¢•/pFNUQIgT L 6 IN4TIE RSOF OFT PENICO. RACE MIAG WITMINNMODRS Cf MNRLTIE xomn SmEOf TIETRHpTxE SETXEWAAtMIIY sECpIowATERING. NAl58rt,ML ROMTE �y e! V' Y IRHro FACENAp URME REND DIGHOLFLRWTSLL DM SfMIFVTRESOESMOBOTTpAOF THE IKKE BEFORE PUCING THE TREE A THE RANTNG N0.E. 5ET1W OF ROOT BNL FLI/SX TO GPADE qi l3 w. S} E.L'IEILL WRH MODIFIED w 71NG SOIL AS SPECIFIED AND FISHER IN SLOWLY OIS IMING Bql$. CONSINUCrI NIGH FART SAUCER BEYOND EDGE OF RCOTBPIL wATERnnRaNHLv WITHIN z HouRs. MCOATP TNGTDIBPVJITIAMUF AllC4D Ar RAMIHGnuE PER M4IVFIGRMFAB '^I R@1M OJ1 TWIxE RIR OHo wIPEB15FtTAxo @1HM FUW TCP In gRECIIWn. _. J` �pN%T B..Mlxo NNG OF WIREW51{Ei. WNIO RER GREAIFA PFMOh Ill PUSIIC WPP➢CQ ROPE FROM ENRRE bLLL PJ.CE P11OI8VLp1 FlRN UNgUVAROCQ T.V114D SOIL •V TNIP yIR/]p11M Rl5E OFHUf BNCiWALr WIM FOOT PAESLIH EO _D.y � RACERWT BLLLM IRQ(AVAIEOMTNIPFO SOIL. 11UT R'Ol SLLL 0.'B N]T SHIFT. - TAMP500.MWND0.WT&LLLBA4E FlRNLY WrtX FOOT WiE55URE SP/A£TRD'S /OLRDDIGro ROIa. FJ EI-y sD TxArRmT a.LL GOES NOr SHIFT. mp-noE elue¢FRIEDDRr w6u FaRPODRLv awNED sons As 4y.u.eytY,w., I� 3y�Eil I ql IE gREGTEDar THE lwvosfAPE ARcpTEcr. r --II�III11 1111--HIII F i I I I I IF Idol I II� 1 B O TYPICAL EVERGREEN TREE PLANTING �I� wsFxc E ISFlxgiacevWL Mrorogsro RA1 rmrs aIn of TIE alleL uHA Cf WTTOG WS.IIBI ORg11Ul AMRTANCEICIDIS Rows Ra+DYE Nl R[V E MILE NN 0.1EM FHN ILIP 14LLF CF HUT SV L FAM !B SIN6 C O HUT IEAV BY RIIME AT RAMAY. PRIPa par NDI®I ce DEAD MMIOES. HIADDMG MTIIM RIM. pMBIGn1E5R@G RMIIpG SFASDI. NIYEW3BRFg19NN CHWH1Fp WIp IEw QpvTx p MIIIA'F STAf£ p wnDLDur wIUEREEn®. pWIWT ATRMTpG TOE19 MWEKTIRHl5 D0Salp6 OCONTAINER GROWN PLANT AND BED PREPARATION Drn u•,F 11. AbIIT PRODUCT DATA, mLOR SMILES, SOIEOULLS, SEED MOSS AND l9YTIRGTES FOR ALL P0.pWCT�. 12, NURSERY SIpIX 9WL MEET TIE AMERIGH MMOWD FOR NURSERY 9MCXASI M. L P RNMTS SOUL BE TRUE TO WPE AND NAME IN ACfOROM(E WITH STAN U = RAM NAMES, Mosr REmMT moron. 13, PROVIDE HEALTHY, WEALS P1NH5 FREE OF DISEASE. IPiRS, EGGS, LARVAE, AHD FREE OF DEFECTS, ANIASIOI M DISFIQpEIIEM. 14. DflrvEE PAIXH£PRDDUCRNpLIGpK EDNTAMEPS MD RlOTKT RECOUCI9 WONT DE'IEWORAT[ON gWNG OELIVELT MD sToaAGE oN SITE 15. PRCA40E MESH RAMS IIm RISTALL TWEDUTEY. DO NOT PRUNE PRIdlOOEIVFRY. PROVIDE PROIELTIYE mIEtR9G 1TINBC 063YELY. E PINfTOMG 6 DELAYED SEf RAMS p SHADE, N® M06T, MD FNIQTECT FROM WEATHER MD FEO WnIGI MMME. Do NDT NBBOVE RANTING sroaE FROM mxrAMERs uMn RVIFmNG T1ME. 1G U¢1➢➢96 OOU&F SHREDDED HARGNOOD MUO1FplALL SHRI 2-. BREAD MULO1 3' TMOOE55 fCR TRffS MO sHwes, r TH1oEss KpFOR PERENNULS. 19. ALL TREg LOGT:Dp NRF AREAS SFWL HAVE AS DG FIUIl}I AW AIM WTDI METAL EDGE METAL EDGING 91RLL H U4' ST<$ GR MOMUM. 18. CNTBZ M9WLL MAKE AT THEIR CNIN EXPENSE, WHATEVEL WA J MEIIII NET)El4NEM ADEQLUIE AIPRY OF WATERrorvrMtTe PETRE THE woRX AS s�RLD. RABzmH ALL nE�nar HosEs, EQUIPMENT, ATTAOlET1R, AHD A FOR T E ADEQUATE T 1NLCH K SPECIFIED . COROT RACENULW IN CUMACT WRH THE fLWi. MN W.HTHE WLGI WEED -FREE FORTHEDJPATION ➢FIIEwANLWTv PHGOO. PLACE MLLCHwTTHIN" HWRSOFSECOND MPERND. OUHa£3RWT BNLgA BCMIFY THESLE9M0 BDTIDM OF THE HOLE N3gEPTHE NWNN THE TIE BA IFUE. 'FHOwR "IH MDDEo FLAMNG NIEAHD ADD Mr N]LANHIpEiITO DR FERRIZFIBA9 BPE6®NO WBIN1CfS1NR1 EICM FLOE OF RIOTBNL YIAIEI IHORQUKI M wURS. z1En 1MI11N A4 SPFGFIFD. Dp NOT R.F� YlILL1H IN CONTIGT WHIN TIE PIANI. 1MNTANIEE MU.CM EOFPEEDIIMTNNOFTIEWMRENTY PIRLCEMILLal w111IxN HOURS OF SECpO WAFERING, DIG HOLE N ROOT E U DU BGVDFYTHE SIDES AND BOTTOM OF THE HIXE BEFORE RACING THE ANT w THEN. Wm1 MURNED RLSNITNCSON_ AS SPECIFIED, WATERIFORO MNLY wrtHw2HOURS IF RAM IS SHIPPED WT H A CONTAINER MOUND THE ROD. SLICE SIDESOFCCNTNNERMDREMOVE CONRET' LEE FINGERS CRSMALL INND TOgS tt1 Pq1 ROUTS pRCf TXE OIJIER UYFR OF PoTTMG $ TNENCUT OR RILLMMI M'Y aRupG RCOODTs. SETTCPOf ROOT6 MUM TOGMADE DRI-2IN. HIGHER IN SLOWLY DRNNING SOH9. PDD MVCORRTTZAL TRPMSPLANT MOCUANT AT RMTNG TIME PER MMUFACTU EfES DI I%IN9. OTYPICAL PERENNIAL PLANTING E N SCAEE ONIfd1IR1IP DF5®®IVD N/NI®MFA9 HK IMP BE REQUIRED M maETE THE WOIU 19. PROVB)ETp0.0Up1 WATEUNG OF AIL R,VMS OIFEDUTELY AFTER BYMWIAnpl.11pPO1K.H WATEEMG SIWL OmAQI� WHIOY T) SIIPREMEM NATURAL MOEAIl WAIiIIIHG SHALL mMOAE 90 DAYS <OR ALL PVwIS m. ALL STONESGT SAGS ANO B0IADEIS 9WLHFNl1 LOCK QIIMRY, SINFOT REPRESE3TATlVE STOLE SAMRESlOONHEI Fpl APPRwu Ruda To oRDERIIIG z1. mxrRAcraR sHN1 w9nn NATIVE s®FmL a saAMa FDA RFAEW MD OWWFR MPROVAL Iw6MEa sIwLBE EVBJvmm YMIa RNIIaE RR fp®1 QAIE RwLErlEwvaw9cewNA 91M1gM®fiYZKPa RNa MVH MCDNISUIS KRn 9p£liQpO]FlM:1® 9A4 MO 9l�lILE AT 6 D63EEMaaE RU6TE®O0. Lpi/LT® R)8IA (Du W 4J N ;ncc DATE 1 1411IM16 sEYEY TOM DRAM Dace® Pm AR�F® MV MO1�Nap IF.tm412 LO.01 • Lake Lucy Road Chanhassen, MN ® Stantec L m m 30' 0' WETLAND,. I (DELINEATED) - 4 ' a I e � / a 30' 25' / w�F / I WETLAND (DELINEATED) 101 � 1 _ 4 LAKE LUCY ROAD ---------------J SITE DEVELOPMENT IMPACTS: PHYSIOGRAPHIC, REGUALTORY & MARKET WETLANDS WETLAND (DELINEATED) = WETLAND BUFFER _ WETLAND SETBACK Residential Neighborhood - 8,97 Ac.❑ Lake Lucy Road 40. 80. 160 Chanhassen, MN NORTH 1-6-2016 ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY CONCEPT 7 ANALYIS.IND -11 O m -. m saw IF 1.-- 30 0' Ls - I , '- WETLAND 30, (DELINEATED) ' I 3 dL a , ...�. 1 i : WETLAND I r 1 � (DELINEATED) � �lay I D, d, � i 1 i It it — — 30, LAKE LUCY ROAD c SITE DEVELOPMENT IMPACTS: PHYSIOGRAPHIC, REGUALTORY & MARKET WETLANDS WETLAND (DELINEATED) WETLAND BUFFER WETLAND SETBACK SETBACKS L YI PERIMETER SETBACKS ROAD RIGHT OF WAY & SETBACKS LOT SETBACKS im ROAD m TRAIL & EASEMENT Residential Neighborhood - 8.97 Ac. Lake Lucy Road 40 80 160. Chanhassen, MN NORTH 1 -6-2016 ® Stantec V: 1938/ACTNE/193803412/GRAPHICS/LAKE LUCY CONCEPT 7 ANALYIS.IND �v o SITE DEVELOPMENT IMPACTS: PHYSIOGRAPHIC, REGUALTORY & MARKET r --. _ 7—, m -, < WETLANDS WETLAND (DELINEATED) for y- L t ; WETLAND BUFFER WETLAND 30 WETLAND SETBACK (DELINEATED) � 414 * SETBACKS I r wv ---- _ � PERIMETER SETBACKS ROAD RIGHT OF WAY &SETBACKS LOT SETBACKS - 3 ROAD ?;; r TRAIL & EASEMENT I f WETLAND I 1 / ; (DELINEATED) LOTS & PONDING LOT PROPERTY LINE "f I 90' LOT WIDTHS STD. & 100' LOT WIDTHS _ i 6 `� (W/"Neck/Flag" lots) - I 15,000 SF MINIMUM 10 - -_ '� ` STORMWATER POND a STORM I , i � 30' Residential Neighborhood - 8.97 Ac, ❑3 I Lake Lucy Road 40 80' 160' LAKE LUCY ROAD ----- Chanhassen, MN NORTH 1-6-2016 ® Stantec d' 3' VA 938/ACTNE/193803412/GRAPHICS/LAKE LUCY CONCEPT 7 ANALYIS.IND O U) m rm �� rm 30' 20' —� L - WETLAND 30' (DELINEATED) R I 30' 25' , IWETLAND I (DELINEATED) 10' `- 'LO - - r - _ STORMW., T - I � or 30 LAKE LUCY ROAD I Its « SITE DEVELOPMENT IMPACTS: PHYSIOGRAPHIC, REGUALTORY & MARKET WETLANDS WETLAND (DELINEATED) WETLAND BUFFER WETLAND SETBACK SETBACKS L PERIMETER SETBACKS ROAD RIGHT OF WAY & SETBACKS LOT SETBACKS TRAIL & EASEMENT LOTS & PONDING LOT PROPERTY LINE 90' LOT WIDTHS STD. & 100' LOT WIDTHS (W/"Neck/Flag" lots) 15,000 SF MINIMUM C:-'-D STORMWATER POND HOMES HOMES WITH 3/CAR GARAGE DRIVEWAYS Residential Neighborhood - 8,97 Ac, Lake Lucy Road 0' 40. 80. 160' (15 Chanhassen, MN NORTH 1 -6-2016 ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY CONCEPT 7 ANALYIS.IND AREA OF SITE ABLE TO BE SERVED BY EXISTING SANITARY SEWER ELEVATION AS IS e a , \ \ \ 11 \1 l I e2 \\\ // g II \ ' \ --41 — �a \ T I I I � `EXISTING SEWER MIN. BASEMENT SERVICABLE AREA �'ELEVATION 1,014' \\\ II! y r ELEv 1028.E — III I 1014 4 - } sip I \ EXISTING SANITARY SEWER PIPE ELEVATION 1007.96' GB — _ EXISTING CONDITION Basement Levels: 31 % of site can be served without grading (cuts). (Area shown is above 1,014') Assumptions Sanitary sewer main, 8" pipe at 0.5%. Sewer service line 4" at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5' and 1,014.5'. A 1,014.0' elevation was used for a average minimum basement elevation. • Front building pad: An 8' difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8'=1,022'. • Street grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2' below garage floor or 1,022 - 2'=1,020' Areas above 1,014' Elevation Sanitary Sewer Serviceability Study [k] 0" 40' 80' 160' Lake Lucy Road NORTH Chanhassen, MN 1-6-2016 ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY EXISTING CONDITIONS.IND AREA OF SITE ABLE TO BE SERVED BY EXISTING SANITARY SEWER ELEVATION BY FILLING / ,I�un!Iltlunqull. ♦� ♦0 ,ore ,q' O 5-] SB -El-1029.2 JiYS! EIE 10M.2 SB ELE =1023,7 --I %- - iozz I u/nTuunrruulruurL /' � 1 Ik �\ \ _----- ' ' \ E 0, � / I '��ImnwnwnunnmuuuuuuW_ \ ? I I I �-iuoene 1 I I I I PROPOSED MINIMUM MIN. BASEMENT 4-- II BUILDING AREA i ELEVATION ` = 40'0� 1,014'I <\ - J FI EXCESR OFO' QUIRE SPECIAL-MATER&S AND COMPACTION \ , �i � ,�E - „� \, �,� - SEE SOIL REPORT / \ 'ii,��f, PROPOSED CONDITION Site Plan #7, Basement Levels: 51 % of site must be served via grading (fills). (Area shown is above 1,014') Assumptions Sanitary sewer main, 8" pipe at 0.5%. Sewer service i line 4" at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5' and 1,014.5'. A 1,014.0' elevation was used for a average minimum basement elevation. ~ ` �/IIIIIIl111111111119� �' I - = EXISTING SANITARY SEWER PIPE / ELEVATION 1007.96' �aaa /' _ sart \ l n \ / m I ONw-1i16 GB — - ssz - Front building pad: An 8' difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8'=1,022'. Street grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2' below garage floor or 1,022 - 2'=1,020' 0 Areas above 1,014' Elevation Sanitary Sewer Serviceability Study 0' 40' Lake Lucy Road Chanhassen, MN 1-6-2016 a 80' 160' NORTH 0 Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY EXISTING CONDITIONS.IND I ' ,0 ALL FRONT YARDS WITH - STREEI MUST BE ABOVE -THIS E EVATION 1,020.0' - q III ." . • , / i T' Ile AV10l �/ — eevvao3zv A A V IV 1—�_5Ily� n xa-s � uxX u3o i I I i EXISTING CONDITION Street & Front Yards: (Site is too low given existing sanitary sewer invert) In order to serve a basement elevation of 1,014', the garage floor needs to be at 1,022' and the street needs to be at 1,020' Assumptions Sanitary sewer main, 8" pipe at 0.5%. Sewer service line 4" at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5' and 1,014.5'. A 1,014.0' elevation was used for a average minimum basement elevation. Front building pad: An 8' difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8'=1,022'. ■ Street grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2' below garage floor or 1,022 - 2'=1,020' Areas above 1,020' Elevation Sanitary Sewer Serviceability Study 0 40 80 160 Lake Lucy Road NORM 1 -6-2016 Chanhassen, MN ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY EXInNG CONDITIONS.IND FILL IN EXCESS i 1 ` F 10' REQUIRE SPECIAL MATERIALS I g AND COMPACTION \ \ \ - SEE SOIL REPORT S a II met M I 1I PROPOSED FRONT PAD AREA at�Vu9z ELEVATIONS PROPOSE BETWEEN 1 020' & 1 022' ^' ecv-f01 . \{ I FILL IN EXCESS I - -- - EL . 1,020'-L� OF 10' REQUIRE E SPECIAL MATERIALS ASEE � SSbbOMPACTION SEE I - ,\ ;, -- - ,-- IIL REPO , - y I yr . _•w _ 't — \ � . PROPOSED CONDITION Site Plan 7 Street & Front Yard 25 % of site must be served via grading (fills). (Area shown is above 1,014') 20,000 - 25,000 yards (Areas above 1,020') I EXISTING SANITARY /tP° �'� _ \ Imo, SEWER PIPE i% g' 111 \I ELEVATION 1007.96' ,i � 7 s —, r-� ®-s9s.v-17 Assumptions Sanitary sewer main, 8" pipe at 0.5%. Sewer service line 4" at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5' and 1,014.5'. A 1,014.0' elevation was used for a average minimum basement elevation. • Front building pad: An 8' difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8'=1,022'. • Street grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2' below garage floor or 1,022 - 2'=1,020' Areas above 1,020' Elevation Sanitary Sewer Serviceability Study 0' 40' 80' 160' Lake Lucy Road NORTH Chanhassen, MN 1-6-2016 ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY EXISTING CONDRIONS.IND I I I I I I I I L LA V, E - Concept 1 Residential Neighborhood - 8.97 Ac. Lake Lucy Road 0' 40' 80. 160' Chanhassen, MN NORTH 10-23-2015 ® Stantec V:1938/ACTNE/193803412/GRAPHICS/LAKE LUCV CONCEPTS 1-13-16.IND Concept Residential Neighborhood Lake Lucy Road 0• 40' 80. 160' Chanhassen, MN NORTH 10 23-2015 ® Stantec V,1938/ACTIVE/193803412/GRAPHICS/LAKE LUCV CONCEPTS 1-13-16.IND Concept 3 Residential Neighborhood - 8,97 Ac. Lake Lucy Road 0• 40' 80' 160' Chanhassen, MN NORTH 10-23-2015 ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCV CONCEPTS 1-13-16.IND Concept 4 Residential Neighborhood - 8,97 Ac, Lake Lucy Road 0, 40. 8C' 160. Chanhassen, MN NORTH 10-23-2015 ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCV CONCEPTS 1-13-16.IND Concept 5 Residential Neighborhood - 8.97 Ac. Lake Lucy Road 0' 40. 80' 160• 15 Chanhassen, MN NORTH 1-4-2016 ® stantec V:1938/ACTIVE/193803412/GRAPHIC$/LAKE LUCV CONCEPTS 1-13-16.IND Concept 6 Residential Neighborhood - 8.97 Ac. Lake Lucy Road 0" 40' 80' 160' Chanhassen, MN NORTH 1-4-2016 ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCV CONCEPTS 1-13-16.IND a„7y j NJ♦ T_E i OWNER Yh1N A0.QN411 ^ ` � I SW85 in E, uw , ' UMIFAW9F , . 33DW(dwd) X, 03 o _O ,^! / oWxm: aSnN lOP[86EN q g � SSI 0 im n7 /. It a _ s �I - 8,_ L-C" _ 1 � � 8 7 I — I - I 1 yq� ea �F- .L+J �1♦ �- I i - -� /N C14i Et F / i t - o° o I 'V Concept 7 uWE.uU --f i; h�:v, �•�� Residential Neighborhood - 8.97 Ac, -- Lake Lucy Road 0' 40' 80' 160' m Chanhassen, MN NORTH I wim��n�EOEsamE.sc___ _ �r� __ ��Yun'E„ a iNe N�]sr _ _ - sas _ __ �1' � \ \` samrirvfsr mni� a noRMi�3,Y�r� yp _ >Qy -♦ .� bi: — -. � 1-5-2016 Stantec __ �,,,�� � _(�NEASEOdU19l OF 111E5011111HEf QiEMiBI � � ♦ — — . __ 990 �WYtit// OF T1E NortnEISf QWA\9t OEYC iTwIIq `�Qg(Q �� V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY CONCEPTS 1-13-16.IND W C( 4' sa m. of of tiE san tASF--- — --9lwnat oR me NVarNCAsr — aab 9LLVlIBI63C 3, 1HP ff6=RNG elb ll•RZet�i _N— -es'amewsr mwrel ar 3NE 5alrtgw5T9urR�et Of 1HEM01(11fAST QIII{10{OF YL. 3, M9. 116•- sa7n�ylne �\N 111 _ _ —�,ars 1 RNG. 2i QIYRIFAQ� SCI2t, lI fGRVBI (YIUNry CAST NON NDNLn — _ Concept 8 Residential Neighborhood - 8.97 Ac. Lake Lucy Road 80 160. Chanhassen, MN NORTH 1-12-2016 ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCV CONCEPTS 1-13-16.IND t 1z:* Concept 9a Residential Neighborhood - 8.97 Ac, Lake Lucy Road 0. 40' 80' 160- Chanhassen, MN NORTH 1-12-2016 ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCV CONCEPTS 1-13-16.IND G_3�1CL� Concept 9b Residential Neighborhood - 8.97 Ac. Lake Lucy Road 0' 40' 80' 160' Chanhassen, MN NORTH 1-12-2016 ® stantec V:1938/ACTNE/193803412/GRAPHICS/LAKE LUCY CONCEPTS 1-13-16.IND L-Pk,r (...icy s"rw.. 511w, _ ------------ 30' on,cJ�T a I I I I I I I Ia I N I 1, Concept 10 Residential Neighborhood - 8.97 Ac. Lake Lucy Road 0. 40. 80. 160. Chanhassen, MN NORTH 1-12-2016 ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE WCV CONCEPTS 1-13-16.IND c0FT # t! i ��-7-Ci6 Concept]] Residential Neighborhood - 8.97 Ac, Lake Lucy Road 0' 40' 80' 160' 15 Chanhassen, MN NORTH 1-12-2016 ® stantec V.1938/ACTIVE/193803412/GRAPHICSAAKE LUCV CONCEPTS 1-13-16.IND i , IS, �° I o _ �+rfliwdlllllllllllnuull -- — — g , o II AREA OF SITE ABLE TO BE SERVED BY \ EXISTING SANITARY SEWER °' ` ;1 r ELEVATION BY FILLING _ ,�` i,�i 1Ny g 101..61- - - muuuwunmuumuuuuluuut r PROPOSED MINIMUM MIN. BASEMENT BUILDING AREA eE ELEVATION ELEv=,°175 1014' — ELEY=3020] � 58 C / 1 \ = INV = l 1 4J -- 14 ° ELEv=,au3 ELEu_rma;. � -TIIIIIIIIIIIIIILL -- I° — INV '---, _ 1010' E PROPOSED CONDITION Site Plan #7, Basement Levels: 51 % of site must be served via grading (fills). (Area shown is above 1,014') Assumptions • Sanitary sewer main, 8" pipe at 0.5%. Sewer service line 4" at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5' and 1,014.5'. A 1,014.0' elevation was used for a average minimum basement elevation. Front building pad: An 8' difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8'=1,022'. 'L���' ri,, ��; ✓ Street grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2' below garage floor or 1,022 - 2'=1,020' I �Imnuunnnunmli�gn�, � I J FILL: N EXCESS, OF I W-REQUIRE ON ANDSEE ��i EL=,o0,.:2 ,, Areas above 1,014' Elevation SOIMPACT L REPORT • -1� ��/IIIIIIl141111111111 np = = EXISTING SANITARY - • \ 1 8 zone - o 'O' a _ o� = - SEWER PIPE ELEVATION 1007.96' Sanitary Sewer o —,c OHP aurto m s - s Serviceability t u Ya onv Z�• RNV+a21.12' m INV `ibOT.96' Lake Lucy Road NORTH loot— \2�tr=.� °-° ,'�'° 1-13-2016 Chanhassen, MN ® Stantec V:1938/ACTIVE/193803412/GRAPHICS/LAKE WCY EXISTING CONDITIONS.IND °6 'J °t 0r°, PROPOSED 0NT PAD AREA ELEVATIONS PROPOSE BETWEEN 1,020' & 1,022' a 'erg Emv=,azE-r ' ESB L � + Env-mxa� II SEP i� II oI 01 INV 1011, FILL IN EXCESS OF 10' REQUIRE SPECIAL MATERIALS /I AND COMPACTION -jSEE SOIL REPORT a ElEV=1�9.90 i o II &2 ` I 0 " �; " r �' E1F/=18110.08 B_1 EIw=IDiOF� e o I' i 0 INV — 1010, 1 FILL IN EXCESS ELEV. 11,020' OF 10 REQULRE `SPECIAL MATERIALS `AN6 COMPANION -SEESOILREPO PROPOSED CONDITION Site Plan 7 Street & Front Yard 25 % of site must be served via grading (fills). (Area shown is above 1,014') 20,000 - 25,000 yards (Areas above 1,020') Assumptions • Sanitary sewer main, 8" pipe at 0.5%. Sewer service line 4" at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5' and 1,014.5'. A 1,014.0' elevation was used for a average minimum basement elevation. • Front building pad: An 8' difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8'=1,022'. • Street grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2' below garage floor or 1,022 - 2'=1,020' Areas above 1,020' Elevation EXISTING SANITARY SEWER PIPE �� § ��•�4 ELEVATION 1007.96' Sanitary Sewer ,—k _�I � \ \ ` S I 1S MYE0.T ' � I � /� •)�� - °�O Q �µ MH-103L iY— 1 � � 31— INV W=13.1fi Serviceability Study Ji111A 3421.12' • . �. ,�P B "W100T96 0' 4C' 80 160' — — Lake Lucy Road NORTH __ — --+w,' 'tee ,o, _ ---- -� _ - �.o =�,6 — - Chanhassen, MN 1-13-2016 -__ , ® Stantec V:1938/ACTNE/193803412/GRAPHICS/LAKE LUCY EXISTING CONDRIONS.IND 1 � I I 1s,asa I 6 18,386 ± 10' TRAR, UTILITY & ' .• DRAINAGE EASEMENT I 5"ASPHALT TRAIL L- II I I I'I 5 27.976 it li I 'I II !I 'I Ij it L — — — —jI IL 301 eI k, se-T ?,..K Fner- 4�EE-�- 20� tiF.: �1AwD P. 3 4frtiM1 WETLAND / (MRNAGE 2) / 3 C a8%,623 i I wkToyo B�FKft_ II I ea81 WETLAND I I I I _ I -- i -_ I \\\ t I 22,322 I; � 119,040 II I I II 18,331 I I I III UTILITY EASEMENT 1 I It I I! I I 20.31 I li it I' I I I 1 I ctrT cT 6 I G Ifiizdp DRAINAGE &UTILITY EASEMENTS MIOMf BEING 10 EEET IN WIDTH AND ADJOINING sTREEr altar OF WAY unEs, s FEET IN WIDTH AND ADJOINING LOT LINES AND ID FEET IN WIDTH On REAR LOT LINES AS SHOWN ON THIS RUT, UNlf55 OTHERWISE DIMENSIONED. LEGEND figMM.INE LVl1YE Naswo — — — — — wmnvlsg,efiocwE ®eeo MNwNx xDTEs I. uL DpENsaas ARE To eetic ar cwa BACK OF CURB R.O.W. LIME—` 0 30' FROM" SETBACK LINE Z � iu BUILDING PAD VARIES PER � {5 N SITE o w a — y ' LOT LINE LO' REAR $ETBACJ( LINE J II UTILITY EASEMENTS DENOTES TYPICAL DRAINAGE AND TYPICAL LOT DETAIL EASEMENTS NOT To sate UNLESS OTHERWISE SHOWN ON THE PLAN. acsev M�OA+�►^1 .Meow ,..F+Li Toe ' 11R]I.IIJ 1� 6 0 40 BD fW Humphrey, Roger From: Generous, Bob <bgenerous@ci.chanhassen.mn.us> Sent: Friday, February 26, 2016 10:55 AM To: Humphrey, Roger Cc: Aanenson, Kate; Jeffery, Terry; Smith, Stephanie Subject: RE: 1600 Lake Lucy Rd Attachments: image001jpg; image003jpg Roger I sent the plan to engineering also and here are some comments: You should reconfigure the poles of the flag lots to create 30' wide throats. The lots then have to be 100' wide. Lots 5 and 9. The area of the throats are not counted in the lot area of the flag lot. Lots 5 & 9. The width of the lot on a cul-de-sac must be 90 ft at the building setback line. Lot 8. The wetland and buffer shall be shown in outlots. The stormwater pond on the south side should be located in an outlot. At a minimum, it must be covered by a d&u easement. The easement for the trail and d&u on the south side of lot 6 shall be 20'. If you have any questions or need additional information, please contact me. :.. Robert Generous, AICP Senior Planner 7700 Market Boulevard P.O.Box 147 Chanhassen, MN 55317 (952)227-1131 bgenerous@ci.chanhassen.mn.us Chanhassen is a Community for Life — Providing for Today and Planning for Tomorrow From: Humphrey, Roger(mailto:Roger.Humphrey@stantec.com] Sent: Tuesday, February 23, 2016 4:06 PM To: Generous, Bob Subject: RE: 1600 Lake Lucy Rd e We are proceeding with the attached concept. I had Ryan digitize the graphic, in order to see how this layout fits the ordinance. We have 4 flag lots, 2 of which need variances. The Flag lots are lots 4,5, 8 and 9. Lots 8 and 9 would require front yard setbacks variances. Also we will be out on the site this week doing PM peak traffic counts for turning movements, this will be used for the queuing determination on the proposed access. • � ! 3e' r��e5 S��,A�. • -- I Ene... Q,ec�I- — I —— _—` DRAMAGE EASEMENTS • I D A6 k / M I f ;! • "- 97 • � — -�.-_- „� ','� I , l i I � 10 F£Ef iN WIDTH AND AD]DIMUNG A,�ii lm OF WAY LING, 5 FED IF1 WIDTH • 1 I _ 1 �, I ! %r'� I i I j wIcTU aE.�a mL�mEMs s wN o�r:s WETLAND ( I i I ' PAT, OH KS 9Wi5EJNlS CNFD • t 15,49T I - _____ I I LEGEND I / o" ter^ • _�' �i II 11 ; I I zs' ;'°'u�D>L�LONs���D��. _ � I Q ' / ,i I I wFs'crr„o Br FfF/L • 6 �I , \� I 12 I I 54,812 • I I 18,386 t \ / VVETLANC I I _ BAIX OF CURB HY TRAIL. UTILITY & I r J ! I ,, • DRAINAGE EASEMENT I -'/�' 1 I I R.O.W. LINE — SASPNAITTRAIL ' I , _ ! o • r 30' FRONT SETBACK LINE EASEMENT • _ _ '� DING PAD BUILDING IES PER VARx -- - - -- -L _ : ._ IE • I 5 I I� ,322 : f LNE 3srrx LE —2C^.LY EASEMENT 20,397 DD40TE 4J VI AR�j Ji J J I Cn Z Q J W w U) 0 z • _ I - DRAINAGE AND TY lICAL LOT DETAIL UTILITY EASEMENTS UNLESS OTHERWISE • g — — — — _ _ _ ; -SHOWN ON THE KAN.- e • _ - _ _---- —--------- J. _. ___ _ --____ I ---------------- N ---------=JtiM�r-Vvs' ��D --- - — — — _ — • _ CN f' C,rJ+ Lea.0. — — — — — — — — — 0 40 80 - 2a TWL, UTO_iIY & DRAINAGE EASEMENT S ASPHALT TRAL 9 15.287 , , • I I L J 16.571 18,568 I I I i I 18,992 ` I , , -_______ - _ - - __.30'BLDG. SETBACK— _ - — — — J FROM BUFFER 25 WETuxD BUFFER �-'—_-- 1 I I ti'• 1'• I • l , L� IN, I 11 ayh •�,I � 20,352 I i \ 27,378 f I 25.125 I �� I 18,426 16.073 I! it I I! �� ►� 'I 1 zo,s za I I j -----� (—_ L •--y__—_____.F _�___ _ _ _ _ — I I n I(r I I I/��♦ -In —�------ - - I r.�. - ------ ------------------- c ow c. �fT- I Z 43/i/201 4 DRAINAGE & UTILITY EASEMENTS 1 REA4 1 I I S_ I 1 FROM I 80% 10 FEET IN MOTH AND ADIONIING STREET RIGHT OF WAY LINES, 5 FEET IN WIDTH AND ADIOINING LOT LINES AND 10 FEET IN WIDTH ON REAR LOT LINES AS SHOWN ON 115 PUT, UNLESS OTHERWISE DIMENSIONED. LEGEND �,25' WETLAND BUFFER r�30' BLDG. SETBACK FROM BUFFER I I 1 I I I I I 1 I I I I I , 1 1 I I I 1 I I I 20'UTIUTV EASEMENT II I I "E_u1! I M � :Nv w-me "Al _. munowr UP. 44 �T ue IYYZ PID NI,➢W45EIBb.1lE CW Y9d 9 [FXT9 u,E 6O�PYFv mc[aFSRMYR XOR: 1. AU DIFIErlvaxS WIEro BFCIE OFQWB BACK OF CURB R.O.W. LINE — — o 30' FRONT SETBACK LINE i z � i BUILDING PAD VARIES PER SITE � o b .I I; {I l I L30' REAR SETBACK LINE J TYPICAL LOT DETAIL NOT TO S N 0 40 Bo d C Rqq� EpFE ►l OT LINE DENOTES TYPICAL DRAINAGE AND UTILITY EASEMENTS UNLESS OTHERWISE SHOWN ON THE Pt,.� ,02EY90N DAN 2/2O116 - aRWr OnNx oFs�rm c%oi Humphrey, Roger From: Terry Forbord <tforbord@forbordusa.com> Sent: Thursday, March 03, 2016 9:41 AM To: Humphrey, Roger; Putman, Marc Cc Shardlow, John Subject: RE: Lake Lucy Rd. and Andren Guys, I'm concerned whether the private drive will negatively affect the following: 1. Curb appeal 2. Effect on Marketing 3. Effect on appraised value 4. Waste & Recycling collection trucks 5. Moving & Delivery trucks 6. Guest parking 7. Snow removal 8. Additional HOA Fees for private road maintenance 9. Other Sincerely Terry Forbord Yosemite Holdings LLC Office: (952) 470-5121 Cell: (612) 868-2483 fforbord@forbordusa.com Terry Forbord on Linkedln "The days are long, but the years are short" by - Gretchen Rubin - - "Work hard. Laugh often. Keep your honor" -Tim Russert (1950-2008) From: Terry Forbord Sent: Thursday, March 03, 2016 5:04 AM To: 'Humphrey, Roger' Cc: Shardlow, John Subject: RE: Lake Lucy Rd. and Andren Roger, Are you and Marc available to discuss the Lake Lucy Rd. site plan this morning? Sincerely, Terry Forbord Yosemite Holdings LLC Office: (952) 470-5121 Cell: (612) 868-2483 tforbord@forbordusa.com Terry Forbord on Linkedln 1 A wy f� 1e ff )O(6 c iEv9cai WE vwn wwro oECtFo •YP90V6 iOlx6 19]p C3.01 u'I C.yriti'T.}V9W_V FCE .V'�EFARGI_.'e.T61K.:1 �:X �X,. ax w'z W9EV H£Ar.G6 S mT+is uz:ev;�uc ?.nra� �ze� xctm. � g n ocsx v sray.xo •aaraL s'us cwc �;s.x >.wrt i e�YSE �S PfR6aNaT iLl:,Z'a :6951 �11WSZi 6i�vid:1. �.:+erarawuae:E:c�sKcica '-a-Esv__mn..eaee. va .'MraLtICw TCWKW'¢—S�. uA:M �:S 5: ACC3 rv'eT a. jEa psEr 3..L :?fl r3LxEGW11EJ61TAC� 5 aW+2c>'iV54C:.LMiti MJ'�'ItiwGwfC Tc\-'S vwf=!.�:.EVn`S. 9.EXST3r i+SCA'HwCP+RaRR 6 aLLVK'KaSiD 9RAr4.1BA.Y iO'.IF Mri14 (M�•lA�9rC!R 1f4�.x PTi4S]�a!T:f A394eT- eJ3£'KIIJ S'EI �].^�£ uY. NEGeVpr3 K.'.;x3 GTs Aa1. 6'3L2:� iKcz..�Xaac 5/.11 )FRS.C!SSi TJi gw i.g: aEOflWIS :3ffiT.a9 E' NAiLi6'9 xpGE �/3'ai '. f. `.N.M'S :IX�GR.TE TGRMG:OS +. NL Rr 4a[-AiU_:LiT.O?6 !na: al.5:6s nar OS:R��' rwct wts w,rm •arevF iwE =KLwFta ;imnMro s¢*mvx xnx.�,«. 'S;TiiM Ca6MLLtIGa vpACiGCi WAYIIJW^(W.PT+r6:YY ¢f}.GE Tna?_iC�Ectt iaSrtpci 9L: rp2 inE �wWr�'4A Sw_ RKE h%'YEl a3'ieKEM X¢y:'O6S@ v1i wC SE' WD-_3vE Ms aTE. .v+? 54Lp' f4::i YP VIMv: L` EY.. s'G'•4?IH aTS i CMZ.r�+ASwX:.VAfaB EVaCw MG i�P'.wiA^CX "wI.ZT.':.'..�i rltr AS GIC+ VSw W.(ri d'iQ. iC •SEC--. E+=:.Yi'1.'tYX, 5 C!S`K`£9 ASUb.695ID G BrR19E] C iO8'.xo:iC'RJ:'.s'ti.. Y14L BE �TBE` nEX 6.G�iPr TJ (iA?IEiE'R k E'R36 iMAAiFJ Cx TC.'sW)YG - 9.:iCLC aIDEA9LatREr SNl.LL 9f Yi[E]i M4LV::SYE5 hN 9APN(i M1RGi TJ Ep,Mxf�" i,Ya 14 aTE4 wA2x.W ��II:LL v"NE"J• 14/d �" c>�i ..ArK 6i. .: �T2@6I JPIe-14:<Lv:F Wi9SC.'c3I.K:d G'£LCF+YT.tfA �u:yG'a%L.: 36iK �K'riL^16 E1Dd:1HEM'61'h.�lTc S�}vJMe"FOa vYTP MEaTRr CFMi'}N.yb :i pRY GLL(fL,ti AM4i3i i+)FC645R1: v4 Yi�`kAMItXA�..Y� 3 4: UfS(T� �'aZ d'#YxVb XfK :3 *XE )PrELLSY.uC:Cb iwia Lci!L:u::M. L1E xAIF%.UL:'JWJiJiCME aunuwL .z ra �X ar.:x-.s r, sysr:aEew�AA: vraF m.�;na ru unrv. �.wai war c^ oW zr<ai,+a wrt- YWA•?Pm. :C}'d1 ATCG�MW.i .'aE ^v'F:aTFWi SC YlL4 :r. n,�, r�sY)v�uE:•,A. s.Tciws sr.[ t'S.a:.'.T T�2.Yd'K696u fF.w'Zt�AxE"4i9.1� F/L' LEMWS Nfi4N:31.YlEFWC'a�R�SMPLL pLTWcvL H: Y SnM1'.'.LT,]F :xNESAIBY. :5 Sd^ YtTi �tT551CUu iz wFiYWFL aF3 Y. a^M. Fv6rt 'rt*'!YlL R iS:Pfei In ew riJ� Le+.} AW V.ltl>-'EIOYE T,..2 := V"H� T wf $cY&T EVR9 _-a*Lf^a.YaLC h'G'rt ES':�: �wT. ?.6'+'3N•BY�fw+aVS .: ::.�iAaTA9Val"43uurE::a. SA IG4ME mSJGO�]FP�" 'LSR. rb�4'X:'G.uL'N :+E WtS.E4.]K frF IC (DM1TK'lC£:_ XPiE-a'yYrcGr'•TKE? •.9 FWD+a+.�. �n"LK'd1C ia49w s'r 'rEA2£a..SaEa Si YMQ OPXa. : F �':Yr4^^.OE StaLLSY6i Mry TE.I V!4w!,: +CM. AS OF.$4K'9•'xEE6-Y'3 •TYawaPV.]A�w-„' 'Ja'.aY.^' atr.VS:a�KrM +":�SgY ipC?.Mt Yn ate... ENRr ^. .. ..q.p�rpq GZM n h?•�. r.A' JfrP16Y®W nygW n.-, �.'etC 00.915r1'(F Ei •.* ...`!L•FONY6IWC&CIS::.:. Y"i. C' : JN iFwc6:6 WGLM uuY:ivf.}'S r:Pe (QNaA: CR 9 ELL+:YNFS','t. _Ery "M1: Uf LMSI:K•:Ki.SP[Y ]%E. 3w<�. '-ti R4iA,iTIGSMffi)QaaLp;$ ' !: E�yTa'fx �Ea¢aTb6➢1KLr9.tFaWPACCi2LGG ^�`lCf ::..1N:RnCSi 3'CCinY'a2.vY!a: l'F .3t"SC�+YlwGi6. `a �w.F6#i OWgTw@I�l' 99t}JLIES R4 Y:Sr'{Er 4'V'nL� lYJ4�IA o a m K� Humphrey, Roger From: Terry Forbord <tforbord@forbordusa.com> Sent: Thursday, March 03, 2016 3:25 PM To: Humphrey, Roger, Shardlow, John Subject: FW: Lake Lucy Rd. FYI. Sincerely Terry Forbord From: Terry Forbord Sent: Thursday, March 03, 2016 3:24 PM To: Bob Generous (bgenerous@ci.chanhassen.mn.us) Cc: Stephanie Smith (sbsmith@ci.chanhassen.mn.us) Subject: Lake Lucy Rd. I'm sorry I missed your call on March 22nd, my wife and I took our elderly and frail mothers to Florida for what likely is their last vacation. We returned on March 16` I understand Roger Humphrey with Stantec has been in communication with you and that you also have met with him to review our Concept Plan for Lake Lucy Rd. I have appreciated your and Stephanie's cooperation, support and guidance for the necessary variances and sewer access adjustments so we can make this new neighborhood work. Slight modifications/variances/adjustments can make a world of difference when creating great neighborhoods. I've learned from Roger that at the last meeting you somewhat changed course advancing the idea of a private driveway to serve three to four of the homesites in the northwest corner of the neighborhood. This has created significant problems for a host of reasons. Our builders will not enter the project under those conditions due to the many problems private drives as presented can create and the Realtors are very negative. Here are just a few immediate responses to the negative effects of the private drive concept on the following key provisions 1. Hurts curb appeal of homes 2. Makes marketing of home more difficult 3. Negative effect on the appraised value of the homes 4. Creates problems for Waste & Recycling containers & collection trucks 5. Creates problems for Moving & Delivery trucks 6. Greatly increases difficulty in construction operations & deliveries 7. Imposes limitations on guest parking options 8. Creates challenges for mailbox placement & access 9. Creates compounded complications for snow extraction and storage 10. Creates increased HOA Fees for private road maintenance and all necessary legal documentation already burdened due to the lack of efficient access to municipal sewer 11. Exacerbated Public Safety efficiencies We are working on a productive response with better solutions to eliminate these very negative conditions. We sincerely hope to have your continued cooperation and support so we can move this deal forward. We need to resolve this; time being of the essence. We're running out of time and need to get an application before the Planning Commission posthaste. We will get back to you soon with simple solutions that work for the market and should be acceptable to the City Thank you, Sincerely, Terry Forbord Yosemite Holdings LLC Office: (952) 470-5121 Cell: (612) 868-2483 tforbord@forbordusa.com Terry Forbord on Linkedln "The days are long, but the years are short" by - Gretchen Rubin - - "Work hard. Laugh often. Keep your honor" -Tim Russert (1950-2008) 20, TRAIL, UTILITY & DRAINAGE EASEMENT T ASRIALT TRAIL 10 19,0544 SF I g I 15�956 SF i e I YS,Ib SF I. I E I $ 15,465 SF s I — a ------------ i I 18,254 SF 1 3 $ , I LNE _ i I 27,283 SF I i 24,712 SF 18.538 SF I �I I; II 'I II I lr i/ li II MIN LOT AREA - PROPOSED LOT PROPOSEDLOT LOT NUMBER LOT FRONTAGE LOT FRONTAGE MIN. LOT WIDTH LOT WIDTH FLAGPOLE' AREA, FLAG 'POLE' AREA FLAGPOLE' MIN REQ. PROPOSED AT FYSB PROPOSED AT FY56 NOT INCLUDED NOT INCLUDED INCLUDED LOT 5 30' 30' 100' 110, 15,000 SF -25,795 SF 27,283 SF LOT 8 30' 59.83' 100, 101.42' 15,000 SF *15,146 SF 15,956 SF LOT 30' 37.03' 100, 100.47 15,000 SF `76,034 SF 18,5565E 30, BLDG. SETBACK FROM BUFFER 25 WETLAND BUFFER I I I I \ I I 16.D63 SF I I 25 WETLAND BUFFER —39 BUG. SETH4IX FROM BUFFER UTILITY EASEMENT Igo 20.678 SF I i j-- ___I______� , , L !L _ _ II_ ____ _____1 I---____ _ ' I J _ I � m — — ` —mow � A\ ----= - --_ -- - _--_ - _--_ - - DRAINAGE & UTILITY EASEMENTS 1 0.EF0. ------7 T-----7---- - -5 , _ I FROM MNG 10 FEET IN MOTH ANO ADOINING $IRgT WWT Of WAY LINES, 5 FEET IN WIDTH AND ADJOINING LOT LINES AND 10 FEET IN WIDTH ON HEAR LOT LINES AS SHOWN ON THIS PLAT, UNLESS OTHERWISE MMENSIONEO. LEGEND eovnn. � -------------------- ume ue JUT. nuu ..Dame fWE Of 51RYWN xOTfs: L NL OMENSIONS N2f lO &CK OF OINO. BACK OF CURB R.O.W. LINE o EASEMENT 30, FRONT SETBACK LINE z z u BUILDING PAD VARIES PER 5SITE r N jn, 0 0 Tn N 0 o L30' REAR SETBACK LINE J TYPICAL LOT DETAIL NOT TO SCALE N 0 40 80 I� DENOTES TYPICAL DRAINAGE AND UTILITY EASEMENTS UNLESS OTHERWISE SHOWN ON THE RAN. u 4^ L m �4J - m u W A! ci.oi 20' TRAIL, UrR & DRAINAGE EASEMENT 5' ASPHALT TRAM MIN LOT AREA ` PROPOSED LOT PROPOSED LOT LOT NUMBER LOT FRONTAGE LOT FRONTAGE MIN. LOT WIDTH LOT WIDTH FLAG "POLE" AREA, FLAG "POLE" AREA FLAG "POLE" MFR PROPOSID11 AT FVSB PROPOSED AT FYSB NOT INCLUDED NOT INCLUDED INCLUDED LOT 5 30' 30'1 100' 110' 15,000 SF .11,791 SF 27,'83 SF LOT 8 30' S9.83' 100, 101.42' 15,000 SF '15,146 SF 15,956 SF LOT 9 30' 37.03' 100' 100.47 15,000 SF -16,034 SF 18,556 SF 10 BLDG. SETBACK BUFFER FROM BUIWR 25' WETLAND BUFFER / 18,556 SF R / •18.Ok SF I R 10 ___ j 1 W054 SF _ __________ PS 15.956 SF 8 - I •os.ueg I �7. �_, IQ. 15,465 SF L ---------as-------- 18,254 SF g CZ \ i t r ,9a 27,283 SIF Total Frontage Lot# Frontage Excess frontage Lot 1 131.52 41.52 Lot 2 92.11 2.11 Lot 3 90.01 0.01 Lot 4 94.97 4.97 Lot 5 30 -60 Lot 6 90 0 Lot 7 90.37 0.37 Lot 8 59.83 -30.17 Lot 9 37.03 -52.97 Lot 10 98.55 8.55 Lot 11 322.43 232.43 Lot 12 220.89 130.89 277.71 Areas Total Area Road right a way Wetlands Net �1a:3sF \ /I , ; m I 2a 712 SF / T____ p Total Lots 16,063 SF 20; 7i I 8 SF g l -�-Jr �_iL- �; rL i/ L - _ _ -- _ ____ _______ ______________________ I �---.ems L)Il IL n r 8.08 ac -0.96 ac -1.16 ac 5.96 12 1.48535 Gross DU/AC 12 2.01297 Net DU/AC N (k 0 40 80 u 4j PS u C1.01